BID OPENING:

January 16 2024 B I D T A B U L A T I O N PROJECT No. 9720 CITYWIDE SIDEWALK REPAIR PROJECT PHASE II, CIP 9720 Drawing No.

Bid awarded on _______ by City Council to ___________ Project Engineer: Victor Sanchez for the sum of __________ Project Manager: Victor Sanchez All other bids were rejected and bid bonds returned.

Dated CONTRACTOR #1 CONTRACTOR #4 CONTRACTOR #2 CONTRACTOR #3 CONTRACTOR #6 City Clerk ENGINEER'S

ESTIMATE
ITEM APPROX. UNIT UNIT UNIT UNIT UNIT UNIT UNIT
NO. QUANTITY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL BASE BID NO. 1 - LOCATIONS 1 - 5
1 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 100,000.00$ 100,000.00$ $10,000.00 10,000.00$ $151,000.00 151,000.00$ $120,000.00 120,000.00$ $80,000.00 80,000.00$ 200,000.00$ 200,000.00$ $165,000.00 165,000.00$ 2 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE1 LS 100,000.00$ 100,000.00$ $10,000.00 10,000.00$ $35,500.00 35,500.00$ $150,865.00 150,865.00$ $55,000.00 55,000.00$ 175,000.00$ 175,000.00$ $140,000.00 140,000.00$ 3 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 50,000.00$ 50,000.00$ $5,000.00 5,000.00$ $16,700.00 16,700.00$ $17,000.00 17,000.00$ $6,000.00 6,000.00$ 50,000.00$ 50,000.00$ $20,000.00 20,000.00$ 4 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE19 EA 1,960.00$ 37,240.00$ $2,519.00 47,861.00$ $1,780.00 33,820.00$ $2,500.00 47,500.00$ $3,000.00 57,000.00$ 3,000.00$ 57,000.00$ $2,000.00 38,000.00$ 5 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 30 EA 1,955.80$ 58,674.00$ $3,200.00 96,000.00$ $1,800.00 54,000.00$ $2,500.00 75,000.00$ $3,500.00 105,000.00$ 4,500.00$ 135,000.00$ $3,500.00 105,000.00$ 6 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 6 EA 612.50$ 3,675.00$ $1,100.00 6,600.00$ $550.00 3,300.00$ $800.00 4,800.00$ $1,000.00 6,000.00$ 2,000.00$ 12,000.00$ $2,500.00 15,000.00$ 7 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 1267 LF 38.50$ 48,779.50$ $29.28 37,097.76$ $35.00 44,345.00$ $20.00 25,340.00$ $55.00 69,685.00$ 35.00$ 44,345.00$ $65.00 82,355.00$ 8 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 1267 LF 103.95$ 131,704.65$ $144.00 182,448.00$ $98.00 124,166.00$ $82.00 103,894.00$ $130.00 164,710.00$ 100.00$ 126,700.00$ $120.00 152,040.00$ 9 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 0 LF 73.85$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $100.00 -$ -$ -$ $0.00 -$ 10 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 0 LF 167.30$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $200.00 -$ -$ -$ $0.00 -$ 11 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 10824 SF 9.80$ 106,075.20$ $8.55 92,545.20$ $7.00 75,768.00$ $10.00 108,240.00$ $13.00 140,712.00$ 6.25$ 67,650.00$ $15.00 162,360.00$ 12 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 10824 SF 18.20$ 196,996.80$ $16.13 174,591.12$ $12.00 129,888.00$ $20.00 216,480.00$ $24.00 259,776.00$ 20.00$ 216,480.00$ $22.00 238,128.00$ 13 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 16 EA 10,787.35$ 172,597.60$ $6,900.00 110,400.00$ $7,300.00 116,800.00$ $9,000.00 144,000.00$ $4,000.00 64,000.00$ 8,500.00$ 136,000.00$ $10,000.00 160,000.00$ 14 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 7 EA 10,477.25$ 73,340.75$ $9,406.90 65,848.30$ $9,100.00 63,700.00$ $10,000.00 70,000.00$ $5,000.00 35,000.00$ 9,500.00$ 66,500.00$ $11,000.00 77,000.00$ 15 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 5 EA 10,550.40$ 52,752.00$ $6,989.80 34,949.00$ $9,100.00 45,500.00$ $10,000.00 50,000.00$ $4,000.00 20,000.00$ 7,500.00$ 37,500.00$ $12,000.00 60,000.00$ 16 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 17 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 18 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 19 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 4 EA -$ -$ $6,989.80 27,959.20$ $7,500.00 30,000.00$ $7,500.00 30,000.00$ $6,500.00 26,000.00$ 8,000.00$ 32,000.00$ $13,000.00 52,000.00$ 20 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 10 EA 873.25$ 8,732.50$ $900.00 9,000.00$ $245.00 2,450.00$ $500.00 5,000.00$ $600.00 6,000.00$ 700.00$ 7,000.00$ $1,200.00 12,000.00$ 21 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 1196 LF 42.00$ 50,232.00$ $21.45 25,654.20$ $65.00 77,740.00$ $44.00 52,624.00$ $20.00 23,920.00$ 100.00$ 119,600.00$ $30.00 35,880.00$ 22 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 1861 SF 12.25$ 22,797.25$ $8.55 15,911.55$ $8.00 14,888.00$ $12.00 22,332.00$ $15.00 27,915.00$ 9.00$ 16,749.00$ $30.00 55,830.00$ 23 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 1861 SF 25.55$ 47,548.55$ $16.13 30,017.93$ $22.00 40,942.00$ $22.00 40,942.00$ $30.00 55,830.00$ 30.00$ 55,830.00$ $45.00 83,745.00$ 24 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 0 SF 12.08$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $50.00 -$ -$ -$ $0.00 -$ 25 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 0 SF 29.40$ -$ $0.00 - $ $0.00 - $ $0.00 - $ $60.00 - $ -$ -$ $0.00 - $ TOTAL BASE BID NO. 1 (ITEMS 1-25)
(FOR COMPARISON ONLY)
BASE BID NO. 2 - LOCATIONS 6-8
26 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 100,000.00$ 100,000.00$ $8,000.00 8,000.000$ $155,200.00 155,200.00$ $27,000.00 27,000.00$ $78,000.00 78,000.00$ 200,000.00$ 200,000.00$ $125,000.00 125,000.00$ 27 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE1 LS 100,000.00$ 100,000.00$ $6,000.00 6,000.000$ $41,000.00 41,000.00$ $65,000.00 65,000.00$ $55,000.00 55,000.00$ 150,000.00$ 150,000.00$ $120,423.00 120,423.00$ 28 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 50,000.00$ 50,000.00$ $5,000.00 5,000.000$ $18,500.00 18,500.00$ $14,000.00 14,000.00$ $6,000.00 6,000.00$ 50,000.00$ 50,000.00$ $17,500.00 17,500.00$ 29 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE14 EA 1,960.00$ 27,440.00$ $2,519.00 35,266.000$ $1,780.00 24,920.00$ $2,500.00 35,000.00$ $3,000.00 42,000.00$ 3,500.00$ 49,000.00$ $2,000.00 28,000.00$ 30 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 26 EA 1,955.80$ 50,850.80$ $3,200.00 83,200.000$ $1,800.00 46,800.00$ $2,500.00 65,000.00$ $3,500.00 91,000.00$ 4,500.00$ 117,000.00$ $3,500.00 91,000.00$ 31 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 15 EA 612.50$ 9,187.50$ $1,100.00 16,500.000$ $550.00 8,250.00$ $800.00 12,000.00$ $1,000.00 15,000.00$ 2,000.00$ 30,000.00$ $2,500.00 37,500.00$ 32 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 782 LF 38.50$ 30,107.00$ $29.28 22,896.960$ $35.00 27,370.00$ $20.00 15,640.00$ $55.00 43,010.00$ 35.00$ 27,370.00$ $65.00 50,830.00$ 33 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 782 LF 103.95$ 81,288.90$ $144.00 112,608.000$ $98.00 76,636.00$ $82.00 64,124.00$ $130.00 101,660.00$ 100.00$ 78,200.00$ $120.00 93,840.00$ 34 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 0 LF 73.85$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $100.00 -$ -$ -$ $0.00 -$ 35 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 0 LF 167.30$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $200.00 -$ -$ -$ $0.00 -$ 36 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 15,528 SF 9.80$ 152,174.40$ $8.55 132,764.400$ $7.00 108,696.00$ $10.00 155,280.00$ $13.00 201,864.00$ 6.25$ 97,050.00$ $15.00 232,920.00$ 37 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 13,936 SF 18.20$ 253,635.20$ $16.13 224,787.680$ $12.00 167,232.00$ $20.00 278,720.00$ $24.00 334,464.00$ 20.00$ 278,720.00$ $22.00 306,592.00$ 38 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 10,787.35$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 39 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 10,477.25$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 40 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 10,550.40$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 41 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 42 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 43 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 44 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $8,000.00 -$ -$ -$ $0.00 -$ 45 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 0 EA -$ -$ $0.00 -$ $0.00 -$ $0.00 -$ $1,500.00 -$ -$ -$ $0.00 -$ 46 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 1,181 LF 42.00$ 49,602.00$ $21.45 25,332.450$ $65.00 76,765.00$ $44.00 51,964.00$ $20.00 23,620.00$ 100.00$ 118,100.00$ $30.00 35,430.00$ 47 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 1,407 SF 12.25$ 17,235.75$ $8.55 12,029.850$ $8.00 11,256.00$ $12.00 16,884.00$ $12.00 16,884.00$ 9.00$ 12,663.00$ $30.00 42,210.00$ 48 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 1,407 SF 25.55$ 35,948.85$ $16.13 22,694.910$ $22.00 30,954.00$ $22.00 30,954.00$ $28.00 39,396.00$ 30.00$ 42,210.00$ $45.00 63,315.00$ 49 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 0 SF 12.08$ -$ $9.25 -$ $0.00 -$ $0.00 -$ $50.00 -$ -$ -$ $0.00 -$ 50 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 0 SF 29.40$ -$ $28.50 -$ $0.00 - $ $0.00 - $ $100.00 - $ -$ -$ $0.00 - $ TOTAL BASE BID NO. 2 (ITEMS 26-50)
(FOR COMPARISON ONLY)
2,898,898.00$
CONTRACTOR #5
2,805,667.00$
DOD Construction LTD
3501 Edison Hwy, Bakersfield CA 93307
(661)366-8000
1,555,354.00$
Coastal Paving & Excavating, Inc.
24560 Silver Cloud Ct. Monterey, CA 93940
(831)646-2099
1,654,338.00$
1,244,560.00$ 1,250,313.00$
1120 Ninth Ave, San Mateo, CA 94402
JJR Construction
(650)343-6109
550 Greenville Rd, Livermore, CA 94550
(925)245-1300
GRAND TOTAL BASE BID (ITEMS 1-50) 2,218,616.20$ 1,688,963.51$ 2,115,583.00$ 1,854,086.00$ FBD Vangaurd Construction
707,080.250$
Precion Grade Inc
5 San Juan Grade Rd, Ste 150, Salinas CA 93906
(831)800-1602
1,060,507.00$ 1,284,017.00 $

UNITDESCRIPTION
981,883.26$ 1,261,145.80$
957,470.40$
Anderson Pacific Engineering Construction, Inc.
1370 Norman Ave, Santa Clara, CA 95054
(408)970-9900
1,202,548.00$
1,047,898.00$ 793,579.00$ 831,566.00 $
2,250,446.00$
1/23/2024 10:10 AM J:\p\9720 - 3911.50.9720 Citywide Sidewalk Repair Project #2 (ARPA)\BID OPERATIONS\Exhibit-A_BidTab- PHASE II.xls Page 1 of 1