BID OPENING:

Feb. 6, 2024

BID TABULATION
2024 Pavement Improvements
CIP No. 9981
Bid awarded on _________ by Salinas City Council by Resolution No. _______ (NCS) to: ________________ Drawing No. 8258 for for the sum of ________________ (BaseBid No. 1 thru 6 + Additive Alternate No. 1 thru 6.) Project Coordinator: Phavana Aramkul All other bids were rejected and bid bonds returned. Project Manager: Adriana Robles Dated this ______ day of _________, 2024
Cit y Clerk
ITEM
CODE
BASE BID No. 1 (Dist 1 – Garner Ave)
1 MOBILIZATION 1L S 2,500.00 2,500.00 8,000.00 $ 8,000.00 $ 3,800.00 $ 3,800.00 $ 6,000.00 $ 6,000.00 $ 4,500.00 $ 4,500.00 $ 2 SEDIMENT & EROSION CONTROL 1 LS 3,500.00 3,500.00 6,000.00 $ 6,000.00 $ 1,000.00 $ 1,000.00 $ 9,000.00 $ 9,000.00 $ 1,500.00 $ 1,500.00 $ 3 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 7,500.00 $ 7,500.00 $ 4,000.00 $ 4,000.00 $ 7,500.00 $ 7,500.00 $ 12,500.00 $ 12,500.00 $ 4 CRACK TREATMENT 2 LLM 5,000.00 10,000.00 4,050.00 $ 8,100.00 $ 4,100.00 $ 8,200.00 $ 4,050.00 $ 8,100.00 $ 5,835.00 $ 11,670.00 $ 5 PAVEMENT DIGOUT AND REPAIR, 6" THICK 1,475 SF 25.00 36,875.00 26.00 $ 38,350.00$ 20.00$ 29,500.00$ 20.00$ 29,500.00$ 10.00$ 14,750.00$ 6 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 5,999.50 5,999.50 1,095.00 $ 1,095.00$ 1,095.00$ 1,095.00$ 1,095.00$ 1,095.00$ 1,440.00$ 1,440.00$ TOTAL BASE BID No. 1 (Items No. 1-6 ) (For Comparison Only) 1,481 Add-Alt 1 (Dist 1 – Old Stage Rd)
7 MOBILIZATION 1 L S 2,500.00 2,500.00 7,400.00 $ 7,400.00 $ 3,500.00 $ 3,500.00 $ 16,000.00 $ 16,000.00 $ 16,000.00 $ 16,000.00 $ 8 SEDIMENT & EROSION CONTROL 1 LS 10,500.00 10,500.00 2,350.00 $ 2,350.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 1,500.00$ 1,500.00 $ 9 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 6,300.00 $ 6,300.00 $ 8,000.00 $ 8,000.00 $ 10,000.00 $ 10,000.00 $ 5,200.00 $ 5,200.00 $ 10 PAVEMENT DIGOUT AND REPAIR, 6" THICK 13,630 SF 25.00 340,750.00 9.25 $ 126,077.50 $ 10.00$ 136,300.00$ 9.00$ 122,670.00 $ 9.00$ 122,670.00 $ 11 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 36,125.00 36,125.00 11,700.00$ 11,700.00$ 11,700.00$ 11,700.00$ 11,700.00$ 11,700.00$ 14,635.00$ 14,635.00$ Total Add-Alt No. 1 (Items No. 7-11) (For Comparison Only) 13,634 Add-Alt 2 (Dist 1 – Mae Ave)
12 MOBILIZATION 1 L S 1,500.00 1,500.00 5,900.00 $ 5,900.00 $ 3,500.00 $ 3,500.00 $ 11,000.00 $ 11,000.00 $ 11,400.00 $ 11,400.00 $ 13 SEDIMENT & EROSION CONTROL 1 LS 2,500.00 2,500.00 3,370.00 $ 3,370.00 $ 500.00 $ 500.00 $ 3,000.00$ 3,000.00 $ 1,500.00 $ 1,500.00 $ 14 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 5,285.00 $ 5,285.00 $ 5,050.00 $ 5,050.00 $ 5,000.00 $ 5,000.00 $ 12,000.00 $ 12,000.00 $ 15 CRACK TREATMENT 2 LLM 5,000.00 10,000.00 2,240.00 $ 4,480.00 $ 2,250.00 $ 4,500.00 $ 2,240.00 $ 4,480.00 $ 5,835.00 $ 11,670.00 $ 16 PAVEMENT DIGOUT AND REPAIR, 6" THICK 7,500 SF 25.00 187,500.00 9.75 $ 73,125.00$ 9.00$ 67,500.00$ 13.00$ 97,500.00$ 10.00$ 75,000.00$ 17 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 20,900.00 20,900.00 1,315.00 $ 1,315.00$ 1,315.00$ 1,315.00$ 1,315.00$ 1,315.00$ 1,705.00$ 1,705.00$ Total Add-Alt No. 2 (Items No. 12-17) (For Comparison Only) 7,506 229,900.00 BASE BID No. 2 (Dist 2 – Towt St)
18 MOBILIZATION 1 L S 3,000.00 3,000.00 16,000.00 $ 16,000.00 $ 60,000.00 $ 60,000.00 $ 92,000.00 $ 92,000.00 $ 57,000.00 $ 57,000.00 $ 19 SEDIMENT & EROSION CONTROL 1 LS 4,000.00 4,000.00 12,000.00 $ 12,000.00 $ 2,000.00 $ 2,000.00 $ 10,000.00 $ 10,000.00 $ 1,500.00 $ 1,500.00 $ 20 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 33,000.00 $ 33,000.00 $ 44,560.00 $ 44,560.00 $ 60,000.00 $ 60,000.00 $ 33,000.00 $ 33,000.00 $ 22 CRACK TREATMENT 4 LLM 5,000.00 20,000.00 4,050.00 $ 16,200.00 $ 4,100.00 $ 16,400.00 $ 4,050.00 $ 16,200.00 $ 5,835.00 $ 23,340.00 $ 21 PAVEMENT DIGOUT AND REPAIR, 6" THICK 61,165 SF 25.00 1,529,125.00 8.00 $ 489,320.00 $ 9.00$ 550,485.00 $ 12.00$ 733,980.00$ 7.00$ 428,155.00 $ 23 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 156,399.50 156,399.50 21,150.00$ 21,150.00$ 21,150.00$ 21,150.00$ 21,150.00$ 21,150.00$ 26,450.00$ 26,450.00$ TOTAL BASE BID No. 2 (Items No. 18-23) (For Comparison Only) 61,173 BASE BID No. 3 (Dist 3 – Abbott St)
24 MOBILIZATION 1L S 2,000.00 2,000.00 9,000.00 $ 9,000.00 $ 10,000.00 $ 10,000.00 $ 21,000.00 $ 21,000.00 $ 16,000.00 $ 16,000.00 $ 25 SEDIMENT & EROSION CONTROL 1 LS 2,000.00 2,000.00 6,000.00 $ 6,000.00 $ 1,000.00 $ 1,000.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 26 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 7,500.00 $ 7,500.00 $ 7,000.00 $ 7,000.00 $ 40,000.00 $ 40,000.00 $ 23,500.00 $ 23,500.00 $ 27 PAVEMENT DIGOUT AND REPAIR, 6" THICK 9,740 SF 25.00 243,500.00 9.75 $ 94,965.00$ 11.00$ 107,140.00$ 15.00$ 146,100.00$ 12.00$ 116,880.00$ 28 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1L S 25,500.00 25,500.00 3,225.00 $ 3,225.00$ 3,225.00$ 3,225.00$ 3,225.00$ 3,225.00$ 3,995.00$ 3,995.00$ TOTAL BASE BID No. 3 (Items No. 24-28) (For Comparison Only) 9,744 Add-Alt 3 (Dist 3 – Riker St)
29 MOBILIZATION 1 L S 3,000.00 3,000.00 7,525.00 $ 7,525.00 $ 3,500.00 $ 3,500.00 $ 35,000.00 $ 35,000.00 $ 30,000.00 $ 30,000.00 $ 30 SEDIMENT & EROSION CONTROL 1 LS 4,000.00 4,000.00 8,950.00 $ 8,950.00 $ 1,000.00 $ 1,000.00 $ 8,000.00 $ 8,000.00 $ 1,500.00 $ 1,500.00 $ 31 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 12,700.00 $ 12,700.00 $ 14,150.00 $ 14,150.00 $ 27,000.00 $ 27,000.00 $ 13,000.00 $ 13,000.00 $ 32 CRACK TREATMENT 3 LLM 5,000.00 15,000.00 2,240.00 $ 6,720.00 $ 2,250.00 $ 6,750.00 $ 2,240.00 $ 6,720.00 $ 5,835.00 $ 17,505.00 $ 33 PAVEMENT DIGOUT AND REPAIR, 6" THICK 27,750 SF 25.00 693,750.00 7.25 $ 201,187.50$ 8.00$ 222,000.00$ 11.00$ 305,250.00$ 8.00$ 222,000.00$ 34 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 72,320.00 72,320.00 13,690.00$ 13,690.00$ 13,690.00$ 13,690.00$ 13,690.00$ 13,690.00$ 17,125.00$ 17,125.00$ Total Add-Alt No. 3 (Items No. 29-34) (For Comparison Only) 27,757 BASE BID 4 (Dist 4 – OVLY - Tampico St)
35 MOBILIZATION 1 L S 3,000.00 3,000.00 35,000.00 $ 35,000.00 $ 32,000.00 $ 32,000.00 $ 43,000.00 $ 43,000.00 $ 37,000.00 $ 37,000.00 $ 36 SEDIMENT & EROSION CONTROL 1 LS 4,000.00 4,000.00 8,750.00 $ 8,750.00 $ 2,000.00 $ 2,000.00 $ 6,000.00 $ 6,000.00 $ 1,500.00 $ 1,500.00 $ 37 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 30,500.00 $ 30,500.00 $ 20,000.00 $ 20,000.00 $ 30,000.00 $ 30,000.00 $ 18,000.00 $ 18,000.00 $ 38 PAVEMENT DIGOUT AND REPAIR, 6" THICK 17,700 SF 25.00 442,500.00 9.00 $ 159,300.00$ 7.50$ 132,750.00$ 12.00$ 212,400.00$ 8.00$ 141,600.00$ 39 CONSTRUCT 2" THICK TYPE A ASPHALT CONCRETE 736 TON 170.00 125,120.00 180.00$ 132,480.00$ 215.00$ 158,240.00$ 190.00$ 139,840.00$ 240.00$ 176,640.00$ 40 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED

PAVEMENT MARKERS
(PER PLAN; INCLUDES REMOVAL) 1 L S 58,200.00 58,200.00 3,725.00 $ 3,725.00 $ 3,725.00 $ 3,725.00 $ 3,725.00 $ 3,725.00 $ 4,595.00 $ 4,595.00 $ Total BASE BID 4 (Items No. 35-40) (For Comparison Only) 18,440 280,500.00$
1,720,024.50$
397,375.00$
66,374.50$

ENGINEERING ESTIMATE
625,820.00$
795,570.00$
61,195.00$
160,870.00$
122,295.00$
933,330.00$
212,825.00$
46,360.00$
160,005.00$
113,275.00$
569,445.00$
161,875.00$
395,660.00$
434,965.00$
301,130.00$
379,335.00$
ITEM
NO. UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE
GraniteRock
350 Technology Drive
Watsonville, Ca 95076
DESCRIPTION UNIT TOTAL APPROX. QTY TOTAL TOTAL TOTAL TOTALUNIT PRICE Coastal Paving & Excavating Inc.
24560 Silver Cloud Ct. Suite 101
Monterey Ca. 93940
CONTRACTOR #3
A. Teichert & Son Inc.

DBA Teichert Construction
5200 Franklin Dr. Suite 115
Pleasanton Ca. 94588
Granite Construction Co.
580 West Beach Street
Watsonville Ca. 95076
CONTRACTOR #4
47,595.00$
CONTRACTOR #1 CONTRACTOR #2
69,045.00$
153,827.50$
93,475.00$
587,670.00$
120,690.00$
250,772.50$
369,755.00$
160,500.00$
82,365.00$
694,595.00$
128,365.00$
261,090.00$
348,715.00$
2/7/2024 J:\p\9981 2023 Pavement Restoration Phase 1\Office\estimates\2024 Pave Improv CIP9981.02.06.24.xlsx Page 1 of 3 BID OPENING:

Feb. 6, 2024

BID TABULATION
2024 Pavement Improvements
CIP No. 9981
ITEM
CODE

ENGI NEERING ESTIMATE
ITEM
NO. UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE
GraniteRock
350 Technology Drive
Watsonville, Ca 95076
DESCRIPTION UNIT TOTAL APPROX. QTY TOTAL TOTAL TOTAL TOTALUNIT PRICE Coastal Paving & Excavating Inc.
24560 Silver Cloud Ct. Suite 101
Monterey Ca. 93940
CONTRACTOR #3
A. Teichert & Son Inc.

DBA Teichert Construction
5200 Franklin Dr. Suite 115
Pleasanton Ca. 94588
Granite Construction Co.
580 West Beach Street
Watsonville Ca. 95076
CONTRACTOR #4CONTRACTOR #1 CONTRACTOR #2
Add-Alt 4 (Dist 4 – OVLY - Pacheco St)
41 MOBILIZATION 1 L S 3,000.00 3,000.00 15,000.00 $ 15,000.00 $ 3,500.00 $ 3,500.00 $ 11,000.00 $ 11,000.00 $ 23,000.00 $ 23,000.00 $ 42 SEDIMENT & EROSION CONTROL 1 LS 4,000.00 4,000.00 2,925.00 $ 2,925.00 $ 1,000.00 $ 1,000.00 $ 1,800.00 $ 1,800.00 $ 1,500.00 $ 1,500.00 $ 43 TEMPORARY TRAFFIC CONTROL 1 LS 7,500.00 7,500.00 8,065.00 $ 8,065.00 $ 3,500.00 $ 3,500.00 $ 7,200.00 $ 7,200.00 $ 9,000.00 $ 9,000.00 $ 44 PAVEMENT DIGOUT AND REPAIR, 6" THICK 9,130 SF 25.00 228,250.00 8.00 $ 73,040.00$ 6.00$ 54,780.00$ 6.00$ 54,780.00$ 10.00$ 91,300.00$ 45 CONSTRUCT 2" THICK TYPE A ASPHALT CONCRETE 431 TON 170.00 73,270.00 190.00$ 81,890.00$ 115.00$ 49,565.00$ 106.00$ 45,686.00$ 240.00$ 103,440.00$ 46 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 39,499.50 39,499.50 595.00$ 595.00$ 595.00$ 595.00$ 595.00$ 595.00$ 840.00$ 840.00$ Total Add-Alt No. 4 (Items No. 41-46) (For Comparison Only) 9,565 BASE BID No. 5 (Dist 5 - N 1St St)
47 MOBILIZATION 1L S 4,000.00 4,000.00 11,250.00 $ 11,250.00 $ 45,000.00 $ 45,000.00 $ 62,000.00 $ 62,000.00 $ 36,000.00 $ 36,000.00 $ 48 SEDIMENT & EROSION CONTROL 1 LS 5,000.00 5,000.00 8,500.00 $ 8,500.00 $ 2,000.00 $ 2,000.00 $ 9,100.00 $ 9,100.00 $ 1,500.00 $ 1,500.00 $ 49 TEMPORARY TRAFFIC CONTROL 1 LS 6,000.00 6,000.00 22,000.00 $ 22,000.00 $ 32,000.00 $ 32,000.00 $ 40,000.00 $ 40,000.00 $ 13,000.00 $ 13,000.00 $ 50 CRACK TREATMENT 2 LLM 5,000.00 10,000.00 4,050.00 $ 8,100.00 $ 4,100.00 $ 8,200.00 $ 4,050.00 $ 8,100.00 $ 5,835.00 $ 11,670.00 $ 51 PAVEMENT DIGOUT AND REPAIR, 6" THICK 42,564 SF 25.00 1,064,100.00 7.50 $ 319,230.00 $ 9.00$ 383,076.00 $ 12.00$ 510,768.00$ 7.00$ 297,948.00 $ 52 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 108,900.00 108,900.00 2,300.00$ 2,300.00$ 2,300.00$ 2,300.00$ 2,300.00$ 2,300.00$ 2,875.00$ 2,875.00$ TOTAL BASE BID No. 5 (Items No. 47-52) (For Comparison Only) 42,570 BASE BID 6 (Dist 6 - Independence Blvd - FDR - Ph 1)
53 MOBILIZATION 1 L S 4,000.00 4,000.00 85,000.00 $ 85,000.00 $ 91,000.00 $ 91,000.00 $ 82,000.00 $ 82,000.00 $ 94,000.00 $ 94,000.00 $ 54 SEDIMENT & EROSION CONTROL 1 LS 5,000.00 5,000.00 9,000.00 $ 9,000.00 $ 3,000.00 $ 3,000.00 $ 7,700.00 $ 7,700.00 $ 1,500.00 $ 1,500.00 $ 55 TEMPORARY TRAFFIC CONTROL (INCLUDES PORTABLE CHANGEABLE MESSAGE SIGNS ) 1 L S 17,000.00 17,000.00 64,000.00$ 64,000.00 $ 76,000.00 $ 76,000.00 $ 63,000.00 $ 63,000.00 $ 78,742.50 $ 78,742.50 $ 56 HOT MIX ASPHALT (TYPE A) (5.5" DEPTH) 2,442 TON 170.00 415,140.00 155.00$ 378,510.00$ 180.00$ 439,560.00$ 123.00$ 300,366.00$ 150.00$ 366,300.00$ 57  UNCLASSIFIED ROADWAY EXCAVATION (16" DEPTH)   0  CY  160.00 0.00 -$ -$ -$ -$ -$ 58 SOIL STABILIZATION FULL-DEPTH REHABILITATION 65,110 SF 10.00 651,100.00 3.25$ 211,607.50$ 3.20$ 208,352.00$ 4.00$ 260,440.00$ 4.60$ 299,506.00$ 59 CEMENT TREATMENT FOR FULL DEPTH REHABILITATION 163 TON 200.00 32,600.00 227.00$ 37,001.00$ 250.00$ 40,750.00$ 280.00$ 45,640.00$ 220.00$ 35,860.00$ 60 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED

PAVEMENT MARKERS
(PER PLAN; INCLUDES REMOVAL) 1 L S 113,954.00 113,954.00 49,065.00$ 49,065.00 $ 55,000.00 $ 55,000.00 $ 49,065.00 $ 49,065.00 $ 61,015.00 $ 61,015.00 $ 61 FURNISH AND INSTALL SIGN AND POST 3 EA 500.00 1,500.00 565.00 $ 1,695.00$ 565.00 $ 1,695.00$ 565.00 $ 1,695.00$ 565.00 $ 1,695.00$ 62 FURNISH AND INSTALL SIGN (EXISTING POLE/POST) 2 EA 300.00 600.00 435.00 $ 870.00 $ 435.00 $ 870.00 $ 435.00 $ 870.00 $ 435.00 $ 870.00 $ Total Base Bid 6 (Items No. 53-62) (For Comparison Only) 67,724 Add-Alt 5 (Dist 6 - Independence Blvd - FDR - Ph 2)
63 MOBILIZATION 1 L S 4,000.00 4,000.00 45,000.00 $ 45,000.00 $ 35,000.00 $ 35,000.00 $ 50,000.00 $ 50,000.00 $ 84,000.00 $ 84,000.00 $ 64 SEDIMENT & EROSION CONTROL 1 LS 5,000.00 5,000.00 4,000.00 $ 4,000.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 1,500.00$ 1,500.00 $ 65 TEMPORARY TRAFFIC CONTROL (INCLUDES PORTABLE CHANGEABLE MESSAGE SIGNS ) 1 L S 8,000. 00 8,000.00 33,000.00 $ 33,000.00$ 35,800.00$ 35,800.00$ 20,000.00$ 20,000.00$ 81,000.00$ 81,000.00$ 66 HOT MIX ASPHALT (TYPE A) (5.5" DEPTH) 2,074 TON 170.00 352,580.00 145.00$ 300,730.00$ 139.50$ 289,323.00$ 124.00$ 257,176.00$ 150.00$ 311,100.00$ 67  UNCLASSIFIED ROADWAY EXCAVATION (16" DEPTH)   0 CY 160.00  0.00 ‐$   -$ -$ -$ -$ -$ -$ 68 SOIL STABILIZATION FULL-DEPTH REHABILITATION 55,305 SF 10.00 553,050.00 2.90$ 160,384.50$ 2.20$ 121,671.00$ 2.80$ 154,854.00$ 4.60$ 254,403.00$ 69 CEMENT TREATMENT FOR FULL DEPTH REHABILITATION 140 TON 80.00 11,200.00 227.00$ 31,780.00$ 247.50$ 34,650.00$ 223.00$ 31,220.00$ 220.00$ 30,800.00$ 70 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED

PAVEMENT MARKERS
(PER PLAN; INCLUDES REMOVAL) 1 L S 93,820.00 93,820.00 59,965.00$ 59,965.00 $ 59,965.00 $ 59,965.00 $ 59,965.00 $ 59,965.00 $ 74,465.00 $ 74,465.00 $ 71 FURNISH AND INSTALL SIGN (EXISTING POLE/POST) 2 EA 300.00 600.00 435.00 $ 870.00 $ 435.00 $ 870.00 $ 435.00 $ 870.00 $ 435.00 $ 870.00 $ Total Add-Alt 5 (Dist 6 - FDR - Ph 2) (Items No. 63-71) (For Comparison Only) 57,525 Add-Alt 6 (Dist 6 - Independence Blvd - FDR - Ph 3)
72 MOBILIZATION 1 L S 4,000.00 4,000.00 100,125.00$ 100,125.00 $ 80,000.00 $ 80,000.00 $ 160,000.00 $ 160,000.00 $ 225,000.00 $ 225,000.00 $ 73 SEDIMENT & EROSION CONTROL 1 LS 5,000.00 5,000.00 4,150.00 $ 4,150.00 $ 2,000.00 $ 2,000.00 $ 3,700.00 $ 3,700.00 $ 1,500.00 $ 1,500.00 $ 74 TEMPORARY TRAFFIC CONTROL (INCLUDES PORTABLE CHANGEABLE MESSAGE SIGNS ) 1 L S 15,000. 00 15,000.00 80,450.00$ 80,450.00$ 90,000.00$ 90,000.00$ 96,000.00$ 96,000.00$ 120,000.00$ 120,000.00$ 75 HOT MIX ASPHALT (TYPE A) (5.5" DEPTH) 6,740 TON 170.00 1,145,800.00 140.00$ 943,600.00$ 146.05$ 984,377.00$ 125.00$ 842,500.00$ 142.00$ 957,080.00$ 76  UNCLASSIFIED ROADWAY EXCAVATION (16" DEPTH)   0  CY  6.00 0.00 -$ -$ -$ -$ -$ -$ 77 SOIL STABILIZATION FULL-DEPTH REHABILITATION 179,715 SF 10.00 1,797,150.00 1.90$ 341,458.50$ 2.00$ 359,430.00$ 2.30$ 413,344.50$ 3.70$ 664,945.50$ 78 CEMENT TREATMENT FOR FULL DEPTH REHABILITATION 450 TON 80.00 36,000.00 227.00$ 102,150.00$ 247.50$ 111,375.00$ 223.00$ 100,350.00$ 220.00$ 99,000.00$ 79 FURNISH AND INSTALL THERMOPLASTIC STRIPING AND MARKINGS; CHANNELIZERS; RAISED PAVEMENT MARKERS (PER PLAN; INCLUDES REMOVAL) 1 L S 300,275.00 300,275.00 145,438.00$ 145,438.00$ 145,440.00$ 145,440.00$ 145,500.00$ 145,500.00$ 181,700.00$ 181,700.00$ Total Add-Alt 6 (Dist 6 - FDR - Ph 3) (Items No.72-79) (For Comparison Only) 186,909 GRAND TOTAL (BASE BIDS 1-6 + ADDITIVE ALTERNATIVES 1-6) (FOR COMPARISON ONLY)
1,240,894.00$
1,198,000.00$
355,519.50$
3,303,225.00$
1,028,250.00$ 574,585.00$
1,761,394.50$
578,279.00$
1,772,622.00$
939,488.50$
838,138.00$
2,249,225.50$
121,061.00$
632,268.00$
810,776.00$
229,080.00$
362,993.00$
836,748.50$
5,387,979.50$ 5,575,869.00$ 6,221,224.50$ 6,350,350.00$ 635,729.50$
1,717,371.50$
11,241,452.50
181,515.00$
371,380.00$
112,940.00$
472,576.00$
916,227.00$
2/7/2024 J:\p\9981 2023 Pavement Restoration Phase 1\Office\estimates\2024 Pave Improv CIP9981.02.06.24.xlsx Page 2 of 3 BID OPENING:

Feb. 6, 2024

BID TABULATION
2024 Pavement Improvements
CIP No. 9981
ITEM
CODE

ENGI NEERING ESTIMATE
ITEM
NO. UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE
GraniteRock
350 Technology Drive
Watsonville, Ca 95076
DESCRIPTION UNIT TOTAL APPROX. QTY TOTAL TOTAL TOTAL TOTALUNIT PRICE Coastal Paving & Excavating Inc.
24560 Silver Cloud Ct. Suite 101
Monterey Ca. 93940
CONTRACTOR #3
A. Teichert & Son Inc.

DBA Teichert Construction
5200 Franklin Dr. Suite 115
Pleasanton Ca. 94588
Granite Construction Co.
580 West Beach Street
Watsonville Ca. 95076
CONTRACTOR #4CONTRACTOR #1 CONTRACTOR #2
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Bidder's Statement Of Subcontractors Part I
Addendum No. 2
Addendum No. 4
X
X
X
X
X
X
X
XDeclation of Local Business Enterprise (if applicable) Bidder's Statement Of Subcontractors Part II
Non-Collusion Declaration Of Sub-Contractor
Bidder's Statement of Good Faith Effort for Local Hire
Bidder's List For The City Of Salinas Engineering And Transportation Department

ITEMS TO BE SUBMITTED WITH PROPOSAL ON BID OPENING DATE ITEMS TO BE SUBMITTED BY LOW BIDDER AND SECOND LOWEST BIDDDER ON/OR WITHIN 5 WORKING DAYS AFTER BID OPENING DATE Proposal
Addendum No. 1
Addendum No. 5
Bid Bond
Bidder’s Statement of Financial Responsibility Technical Ability and Experience Non-Collusion Declaration Of Contractor
Insurance Certification
X
X
Addendum No. 3 X
X
2/7/2024 J:\p\9981 2023 Pavement Restoration Phase 1\Office\estimates\2024 Pave Improv CIP9981.02.06.24.xlsx Page 3 of 3