Closter Park Green Street Concept Plan

Salinas City Council
February 20, 2024

Document
Closter Park Green Street Concept Plan
Meeting
February 20, 2024
Body
Salinas City Council
Original file
4.2 MB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

BEECH ST.

TOWT ST.

DEWEY AVE.

ACOSTA ST.

A A
11 1
111
1 3333
3 3 344
4 4
4 4
441 4 3
2 2 33
55 5
5 5
2 2
7 7777
6 6
7 7 7
7 88
888
8 8
8 8
8 8
8 SECTION A-A: BEECH ST.SCALE: NTS
CONCEPTUAL DESIGN NOTESPROPOSED 6' WIDE BIOFILTRATION CELL WITH CONCRETE CURBRAISED ADA CROSSWALKNEW CROSSWALK BUMPOUT10' WIDE PERMEABLE PAVEMENT PARKING LANE. PERMEABLEPAVEMENTS RECOMMENDED ARE PERVIOUS CONCRETE ORPERMEABLE INTERLOCKING CONCRETE PAVERS.BMP EDUCATIONAL SIGNAGE.REPLACE/REHABILITATE EXISTING ADA CROSSWALK STRIPING.STRIPE NEW ADA CROSSWALKPROPOSED NEW TREE 12345678

CLOSTER PARK GREEN STREET CONCEPT PLAN
BIOFILTRATION CELL[BMP OPTION]
PERMEABLE PAVEMENT: CONCRETE[BMP OPTION]
Site InformationLocationCloster ParkSalinas, CaLatitude/Longitude36.6814°N/121.6151°WGroundwater Depth~56 ft below ground level (fromclosest well from State WellNumber:14S03E27B001M)Hydrologic Soil GroupGroup D PROJECT DESCRIPTIONThe streets surrounding Closter Park present an opportunity to reduce impervious surfaces, introduceenhanced pavements, increase urban greening through bioretention swales, and reduce the urban heat islandeffects, all while promoting a safer pedestrian environment. The streets provide the community access to thePark where street parking and pedestrian traffic serve as the primary transportation methods to the area. Thisgreen street project effort seeks to revitalize and re-envision the surroundings streets to incorporate greeninfrastructure solutions providing improved water quality, lowering flood risk, and increasing pedestrian safety.The green street renovations will encompass Towt St., Beech St., and Dewey Ave. The proposed greenstreets intend to add popped out linear bioretention swales along each street. These bioretention swales willcapture and treat the local stormwater runoff. Adjacent to the bioretention swales will be a 10' wide permeablepavement parking section to provide additional stormwater run-off mitigation. The green street project willserve as an example of improvements that can be made to existing streets to help improve public spaces,effluent stormwater quality, and enhance community connection. Educational signage will be placedstrategically around the streets to promote a better understanding of the project objectives. This synergy canprovide a public and community benefit while improving the environmental quality of the built public space. Thestreets and park are owned and operated by the City of Salinas.

PROJECT VICINITY MAP
Capital Cost EstimateParameterValuePlanning, Design, &Permitting$1,339,000ConstructionSite Preparation$3,976,329Greening Elements$703,655Educational Signage$1,250Contingency(10% subtotal)$468,124TOTAL$6,488,358 PROJECT BENEFITS· Beautification via planting drought-tolerant,native plants in the biofiltration area. Alsoreduce heat island effect by introducing morelandscaped areas.· Pavement and Support Elementsdecreases pavement by replacing withbiofiltration areas and replaced AC pavementwith permeable paving in curbside streetparking.· Provide diverse drought-tolerant, nativevegetation within biofiltration cells andcrosswalk bumpout areas.· Enhanced Community Connection/PublicEducation by use of public educationalsignage explaining park BMP benefits.

Feet160800
TRAFFIC CIRCLE[TRAFFIC CALMING ELEMENT]RAISED CROSSWALK[TRAFFIC CALMING ELEMENT]EDUCATIONAL SIGNAGE[ENHANCED COMMUNITY CONNECTION] BERKELEY SEDGE[SALINAS APPROVED PLANT TYPE OPTION]