May 16, 2024
Luis Ochoa, Sr. Community Development Analyst
Community Development Department
City of Salinas
65 W. Alisal Street, 2nd Floor
Salinas, CA 93901
[email protected]

Re: Sherwood Recreation Center –Architects Scope Change

As requested by the City, CSG Consultants, Inc. (CSG) is pleased to submit this Proposal to assist the City of Salinas (City) with the following services for the Sherwood Recreation Center Renovation Project located at 940 N. Main Street, Salinas.
• Revision to the construction cost estimate for the project per the city’s request due to the scope change.
• Second Revision to the construction cost estimate for the project per the city’s request due to the scope change.
• Additional architectural and landscape design and engineering due to scope changes requested by the city.

Scope of Work
The scope of work for each task is outlined in the attachments. • Attachment 1 & 2: Larry Henrick Consulting invoice for revising the construction cost estimate at 50% CD, per the city's requested value engineering comments. • Attachment 3: MEI add service 4, exterior roofing and skin detailing and misc owner scope revisions.

Work Breakdown and Proposed Fee
CSG fee proposal to provide all labor, material, and expenses to perform the listed services for a total fee of $67,227.00 with a breakdown as follows:

SCHEDULE OF FEES

DESCRIPTION COST

1. Larry Hendrick Consulting Fee Proposal to revised the cost estimate. $2,220.00

2. CSG Project management and coordination including consultant administration and contract management. Document reviews.

$420.00

3. MEI fee proposal for exterior roofing and skin detailing and misc owner scope revisions.
$59,926.00

4. CSG Project management and coordination including consultant administration and contract management. Document reviews.

$2,996.00

5. Larry Hendrick Consulting Fee Proposal to revised the cost estimate. $1,665.00

6. CSG Project management and coordination including consultant administration and contract management. Document reviews.

INCLUDED
TOTAL FEE $67,227.00

CSG PROPOSAL FOR CITY OF SALINAS

PROJECT MANAGEMENT AND DESIGN CONSULTANT SERVICES FOR

SHERWOOD RECREATION CENTER RENOVATION PROJECT
Assumptions and Exclusion s
Should additional work be required beyond the scope of work enumerated in this letter, whether it be due to unforeseen site conditions or Owner requests, additional work shall be compensated either on a T&M basis or fixed fee as requested by the Client.

We look forward to working with the City of Salinas on this additional work. If you have any questions or require additional information, please contact Cyril Charles, P.E., Sr. Project Manager ([email protected]).

Sincerely,

Cyril Charles, PE, Sr. Project Manager
(626) 901-6995 cell,
[email protected]

Attachment:

1. Larry Hendricks Cost Estimate Revision Invoice #2

2. Larry Hendricks Cost Estimate Revision Invoice #3

3. MEI Add Service 4

larryhendrickconsulting.com

INVOICE FOR SERVICES
Client:

CSG Consultants
550 Pilgrim Drive
Foster City, CA 94404
Date: 5/12/2024
Project:

City of Salinas- Sherwood Recreation Center
Salinas, CA

Services Provided:

A. Revise Estimate 2.0- Per City Requested Value Engineering for Sherwood Recreation Center Improvements:

1. Estimate to Provide Improvements and repairs per 50% CD Drawings by MEI Architects. a. Includes take-offs per plans and documents provided by CSG Consultants. b. Compile estimate line items and pricing in CSI Master Format template.

TOTAL Cost for Above Listed Services per Agreement- Time and Material = 12 hours x $185 per hour TOTAL DUE FOR ABOVE LISTED ESTMIATE SERVICES = $2,220 Payable to:

Larry Hendrick Consulting, LLC
21646 Pumice Lane- Wildomar, CA 92595
(Note: Payment for Invoice due 15 days from date of Invoice.) ATTACHMENT #1

larryhendrickconsulting.com

INVOICE FOR SERVICES
Client:

CSG Consultants
550 Pilgrim Drive
Foster City, CA 94404
Date: 5/14/2024
Project:

City of Salinas- Sherwood Recreation Center
Salinas, CA

Services Provided:

A. Revise Estimate 3.0- Per City Requested Value Engineering for Sherwood Recreation Center Improvements:

1. Estimate to Provide Improvements and repairs per notes by MEI Architects 5/6/2024. a. Includes take-offs per plans and documents provided by CSG Consultants. b. Compile estimate line items and pricing in CSI Master Format template.

TOTAL Cost for Above Listed Services per Agreement- Time and Material = 9 hours x $185 per hour TOTAL DUE FOR ABOVE LISTED ESTMIATE SERVICES = $1,665 Payable to:

Larry Hendrick Consulting, LLC
21646 Pumice Lane- Wildomar, CA 92595
(Note: Payment for Invoice due 15 days from date of Invoice.) ATTACHMENT #2

MEI ARCHITECTS 949 GRANT AVENUE SAN FRANCISCO CA 94108 P 415.703.0328 F 415.707.6328 www.meiarchitects.com
15 May 2024

Mr. Cyril Charles
CSG Consultants, Inc
3707 W. Garden Grove Blvd, Ste 100
Orange, CA 92868
[email protected]

Re: City of Salinas; Sherwood Rec Center Add Service 4, Exterior roofing and skin detailing and misc Owner scope revisions.

MEI Project # 821

Dear Cyril:

This proposal supersedes the previous Add Service #4 submitted in early March 2024.

A. Per the on site landscape presentation on 2/28/2024 by Sara Peschel of Groundworks, we have prepared an additional service to cover the scope of work discussed with the City at that meeting.

1. Proceed with development of the “Native Agrarian” concept plan as presented on 2/28/2024 and based on the limits of work per The City of Salinas’ email of 5/12/2024.

2. Fees for the Landscape services include full design through Construction Administration.

Groundwork’s fee is $15,000.00; MEI is adding an additional $1,600 for principal time to review and coordinate the design with consultants. RPM has added $2,500 for additional curb and sidewalk/paving work.

B. Per additional discussions with CSG and the City of Salinas, in April 2024 regarding the cost model and additional scope, we have modified the original AS#4 proposal to add the following scope changes:

1. Reroofing of the entire Sherwood Rec center; removal of the existing roofing and cover board, gutters and flashing and replacing with new TPO materials, gutters and rainwater leaders. The work will require temporary removal/relocation of existing rooftop mechanical equipment on the west side of the building to allow reroofing activities.

2. Removal of existing wood shingles and replacement with new corrugated metal panels as described in our 50% submittal package which was accepted by the City. Previous Add Service #3 covered the design work to prepare the 50% package; this proposal covers the new detailing work required. Work scope includes removal and reinstallation of exterior HVAC systems to allow the skin work to proceed and also includes adding rigid insulation to the exterior walls.

3. Replacement of the existing fencing with an 8’H vertical picket wrought iron fence and gates. Previous direction was to have an artisanal type fencing which proved to be beyond the City’s budget.

4. Replacement of permeable pavers with permeable concrete on the south side of the facility/yard.

5. Addition of ventilation to the main gym space

ATTACHMENT #3

Add Service 4 Fees:

Sherwood Recreation Center
RPM: $8,000.00
MEI $36,926.00
Groundworks $15,000.00
Total $ 59,926.00

Total Fee Summary, Sherwood Recreation Center:

Add Service 4 Add Service 3 Add Service 2 Add Service 1 Base Contract Total All fees RPM $8,000.00 $0.00 $ 7,800.00 $ 0.00 $43.000.00 $ 58,800.00 MEI $36,926.00 $16,838.00 $ 18,642.00 $ 16,240.00 $78,674.00 $167,320.00 Groundworks $15,000.00 $ 0.00 $ 0.00 $0.00 $ 14,490.00 $29,490.00

Total $59,926.00 $16,838.00 $ 26,442.00 $ 16,240.00 $136,164.00 $255,610.00

Regards,

Michael Wang
Principal, MEI Architects
Regards,

Michael Wang
Principal, MEI Architects
Attachments:

1. RPM Add Services

2. Groundworks Add Services

3. Email reduced Groundworks scope confirmation with reduced area of work from City of Salinas

WWW.RPM-TEAM.COM
Engineering AD Services Proposal & Agreement Date: March 6, 2024 Client: MEI Architects Michael Wang Principal 949 Grant Avenue, San Francisco, CA 94108 C: (415) 828-5396 E: [email protected] Project: Sherwood Recreation Center Improvements Site Address/Location: 940 N Main St, Salinas, CA 93906 Conceptual: Client is requesting engineering design services for improvements to an existing recreation center. The center was built in 1949 and is approximately 12,895 square feet. Phase 4 of the project will focus primarily on exterior improvements to the facility such as roof, windows, paint, landscaping, parking, and other miscellaneous construction activities listed below and highlighted in Appendix A. Scope of Services: Providing additional civil engineering services, stamped by a licensed PE in California, in compliance with CBC 2022 / ASCE 7-16, in response to owner driven changes and landscaping updates, for the items below: 1. Civil Engineering Services Including: a. Revised concrete walkways, curbs, and accessible paths Total Fee $2,500

WWW.RPM-TEAM.COM
---------------------------------------- End Contract Terms & Conditions ---------------------------------------- From: David Renard <[email protected]>
Sent: Friday, April 26, 2024 4:36 PM
To: Michael Wang <[email protected]>
Subject: Re: Sherwood Rec: misc items
Hi Michael,
Below is the scope and fee for the revisions and additions we discussed. Do you need a formal proposal?
Structural & Civil
 Updates to fence design
 Updates to structural calculations
 Heaved curb repair design
Electrical
 Remove exhaust fan EF-3
 Revise Panel Schedule
 Revise Keynotes
 Provide Power Mechanical System in Gym Area
 Coordination
Mechanical
 Revise mechanical schedules
 Revise Louver Schedule
 Remove EF-3 and revise mechanical layout.
 Revise keynotes.
 Revise existing Gym Mechanical System
 Coordination
Total fee: $5,500
Regards,
David Renard, President
P: 408-439-3283
E: [email protected]
www.rpm-team.com
Veteran Owned
MARCH 1, 2024 Michael Wang Principal MEI Architects San Francisco, CA Subject: Sherwood Recreation Center Project Dear Michael, I’m very pleased to submit this proposal for Professional Services in connection with the Sherwood Recreation Center Project. PROJECT DETAILS AND SCOPE Groundworks Office Inc. (GWO) has been requested to provide landscape architectural services for the Sherwood Recreation Center (PROJECT). GWO is offering landscape architecture services for Design Development. The project is comprised of exterior and site improvements to an existing recreation facility. The landscape program for the site may consist of at-grade parking, landscape planting, code required ADA access and paving, pedestrian paving, stormwater treatment areas, and other amenities. The site is located at 920 North Main Street in Salinas, California. The site associated with landscape improvements is approximately 3,635 sf and is generally flat. An add-alternate landscape area of approximately 4,560 will be included. GWO will advise and provide design and documentation for the approvals and permitting process, as well as assist the Client with the management and coordination of the landscape scope of work. The Scope of Work to include design and documentation for all landscape areas which include, pedestrian paving, building entry and landscaping in parking areas. The Scope of Work includes, irrigation design, pedestrian paving, site walls, steps, fencing and gates, light fixture selection, landscape grading, site furnishings and all other exterior site elements / features. Groundworks Office will participate in all coordination meetings with the Client/Owner, Architect, Civil Engineer, Structural Engineer, and other necessary consultants. The GROUND WORKS Office landscape architects 1792 5th Street Berkeley California 94710 gwosite.com

proposal includes participating in a normal but efficient process that is within the implied limits of the fee. Deliverables include plans, sections and elevations as required to explain the project to the Owner and the City for approvals and permitting. Exclusions from the scope of work include design and details for roof/building waterproofing and engineering required for all landscape foundations and elements. GWO will provide services generally as described herein, modified as appropriate to support the project team needs. TASK 2 DESIGN DEVELOPMENT (DD) Services To Be Performed o Site lighting design including selection of fixture types and locations of all fixtures. Related electrical engineering will be provided by others. o Confirm and verify coordination between various MEP/FP, civil, structural and architectural drawings. Resolve conflicts. o Define and specify the scope of landscape irrigation. o Coordinate with Civil engineer for final grades and contours. o Prepare final landscape design drawings, include all information required. Include specific plant information, landscape details, landscape calculations, materials finishes, fixtures, and site furniture. o The landscape architect will be responsible for hardscape finished surfaces, the civil engineer will design, engineer, and prepare contract documents for site hardscape features such as [retaining walls, roadways, sidewalks, parking lots]. o Attend meetings, discussions, and presentations to determine final landscape design solution. o Obtain approval from all necessary municipal agencies. Revise drawings as required because of municipality review and approval process. o Coordinate with all other disciplines including attendance at meetings as necessary for the successful completion of the design phase. o Prepare draft of Project Manual with sections project specific rather than generic. Highlight questions for Architect’s and owner’s review. o Provide pricing package sufficient that preliminary pricing can be estimated by a general contractor. o Pricing package to include add alternate for landscape area of approximately 4,560 sf. o Provide electronic versions of check set drawings at 50% and 100% PD. o Assist in value engineering and scope adjustment meetings as required. COMPENSATION Compensation listed for the Scope of Work will be billed as Fixed Fee with a not-to-exceed amount and invoiced each month during the duration of the project. The fee does not include Reimbursable Expenses, which include: printing, plotting, courier service and travel to the project site. per email from
Groundworks 5/7/24,
fees include single
phase DD/CD with
building permit
submittal; per 5/13/24
email from
Groundworks, reduce
fee to $15K, with
reduced area of work
and expand to include
CA services

If you have any questions or concerns regarding this proposal for your project, please don’t hesitate to contact me directly. Sincerely, Sara Peschel Principal, GROUNDWORKS Office

SCOPE ITEMS FEE Task 2 – Design Development $ 18,648 TOTAL $ 18,648 1 Lisa Wang
From: Michael Wang
Sent: Wednesday, May 15, 2024 8:18 AM
To: Lisa Wang
Subject: FW: Sherwood - CSG Fee Proposal for Add Services 9-10

From: Sara Peschel <[email protected]>
Sent: Tuesday, May 14, 2024 4:02 PM
To: Michael Wang <[email protected]>
Subject: Re: Sherwood - CSG Fee Proposal for Add Services 9-10

Hi Michael,

We will make it work with the scope reduced to the main entry plaza.

Best Regards,

Sara Peschel founding partner
GROUNDWORKS Office

email_____ [email protected]

office_____510 . 833 . 2111
cell_______212 . 203 . 5857
web______groundworksoffice.com

From: Michael Wang < [email protected] >
Date: Tuesday, May 14, 2024 at 2:27 PM
To: Sara Peschel < [email protected] >
Subject: FW: Sherwood - CSG Fee Proposal for Add Services 9-10 Hi Sara.

Ugh. Budgetary issues. I’ll be short and direct to the point.

City wants to reduce Groundworks’ scope to the two areas here. Your proposal was for $18K as a single phase DD/CD.

Can we reduce fee to say $15 K for this reduced area and also include CA services?

It that’s OK, we’re good to go.

Kindly let me know.

Michael Wang Architect, LEED AP
Principal
2 MEI ARCHITECTS
949 Grant Avenue, San Francisco, CA 94108
M 415.828.5396
www.meiarchitects.com | [email protected]

From: Luis Ochoa <
[email protected] >
Sent: Monday, May 13, 2024 11:28 AM
To: 'Gelareh Jokar' < [email protected] >; Michael Wang < [email protected] > Cc: Francisco Brambila < [email protected] >; Cristina Gonzalez < [email protected] >; Luis Rodriguez <[email protected] >; Cyril Charles < [email protected] >; Ana Ambriz < [email protected] >; Vicky Sargent <[email protected] >
Subject: RE: Sherwood - CSG Fee Proposal for Add Services 9-10

Hi Gelareh and Michael,

I had a conversation with Ana and Francisco regarding Additional Services 10, and we need to bring the cost of this services down. We will need to scope down the landscape work from Groundworks to the two areas highlighted below.

With this reduction in scope, I imagine that this is going to be bring down the cost for Groundworks and RPM.

3 Please send us the revised cost for additional service #10.

Best,

Luis Ochoa, Sr. Community Development Analyst
Community Development Department
65 West Alisal Street, 2 nd Floor, Salinas, CA 93901
[email protected] | (P) 831-758-7338 | (F) 831-775-4258

From: Gelareh Jokar < [email protected] >
Sent: Thursday, May 9, 2024 9:43 AM
To: Luis Ochoa < [email protected] >
Cc: Francisco Brambila < [email protected] >; Cristina Gonzalez < [email protected] >; Luis Rodriguez <[email protected] >; Cyril Charles < [email protected] > Subject: RE: Sherwood - CSG Fee Proposal for Add Services 9-10

Hi Luis,

Enclosed please find MEI’s breakdown and explanation for the add service 4 amount.

Please let us know if you have any questions.

Thank you

Gelareh Jokar, LEED AP
Assistant Project Manager

CSG Consultants, Inc.
550 Pilgrim Drive, Foster City, CA 94404
www.csgengr.com
[email protected]
650.522.2500 main
657.229.2883 Cell

From: Luis Ochoa <
[email protected] >
Sent: Friday, May 3, 2024 4:25 PM
To: Gelareh Jokar < [email protected] >
Cc: Francisco Brambila < [email protected] >; Cristina Gonzalez < [email protected] >; Luis Rodriguez <[email protected] >; Cyril Charles < [email protected] > Subject: RE: Sherwood - CSG Fee Proposal for Add Services 9-10

Hi Gelareh,

We are on board with Change Order #9, yet we want to have a better understanding about Change Order # 10. That amount is significant, and there is no back-up information from MEI to see how MEI arrived to the $64,839.00. Please send us the back information for this amount.

CAUTION: This message originated outside of the City of Salinas email system. Do not click on links or open attachments unless you are sure the content is safe.
4 Best,

Luis Ochoa, Sr. Community Development Analyst
Community Development Department
65 West Alisal Street, 2 nd Floor, Salinas, CA 93901
[email protected] | (P) 831-758-7338 | (F) 831-775-4258 From: Gelareh Jokar < [email protected] >
Sent: Thursday, May 2, 2024 3:51 PM
To: Luis Ochoa < [email protected] >
Cc: Francisco Brambila < [email protected] >; Cristina Gonzalez < [email protected] >; Luis Rodriguez <[email protected] >; Cyril Charles < [email protected] > Subject: Sherwood - CSG Fee Proposal for Add Services 9-10

Hi Luis,

The CSG fee proposal for added services 9 and 10 and the fee spreadsheet are attached. Please review them and let us know if you have any questions. The city's prompt response to this added service is greatly appreciated so our design team can proceed with their design.

After receiving approval of this change order, MEI will move forward with the CD, and within 1.5 months, they should be able to submit their 90CD set.

Thank you!
Gelareh Jokar, LEED AP
Assistant Project Manager

CSG Consultants, Inc.
550 Pilgrim Drive, Foster City, CA 94404
www.csgengr.com
[email protected]
650.522.2500 main
657.229.2883 Cell

CAUTION: This message originated outside of the City of Salinas email system. Do not click on links or open attachments unless you are sure the content is safe.

← All documents from this meeting