Cities Index.
Attachment 2 Crossing Study at S Hebbron Ave and Prince Pl.pdf

Salinas City Council
August 20, 2024

Document
Attachment 2 Crossing Study at S Hebbron Ave and Prince Pl.pdf
Meeting
August 20, 2024
Body
Salinas City Council
Original file
2.0 MB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

Sherwood Elementary SchoolObserved: 11 Crossings Peak 2 hourCriteria: 40 Crossings Peak 2 hourPRINCE PL

JOHN ST

E ALISAL ST
stop

S HEBBRON AVE
Crosswalk Policy Guidelines
June 2014
12 Figure 6: Feasibility Analysis for Treatments at Uncontrolled Locations

Note: Where no engineering action is recommended in Chart 2, consider applicable education and enforcement efforts. if yes
if no
if yes
if no
if yes
if no
if yes
if no
if yes
if no
feasible
infeasible
20 pedestrians per hour
(in any two hours, not
necessarily consecutive)
cross at the location
Location along a suggested route to
school path or which connects two
pedestrian generators such as a
school, park, bus stop, or hospital
expected to generate pedestrians on a
regular basis
Nearest appropriately
marked or protected
crosswalk is at least 300
feet or more away
Insufficient need
to justify a
marked crosswalk

Low speed (posted or prima
facie 25 MPH), two-lane roadway

Pedestrians can be easily
seen from a feasible
stopping sight distance

Direct pedestrians
to the nearest
marked or
protected crosswalk
Can the sight distance
obstruction be removed or
the speed limit lowered?
Use Salinas Pedestrian
Toolbox and engineering
judgment to determine
treatment options
Direct pedestrians to the
nearest marked crosswalk
or consider installing stop
sign, signal, or grade
separation
S Hebbron Crosswalk
Counted By: Cris
Weather: Sunny
Hours: 7:00am to 6:00pm
Groups Printed- Peds

HEBBRON
From North
Start Time PEDS App. Total Int. Total
07:00 AM 0 0 0
07:15 AM 1 1 1
07:30 AM 5 5 5
07:45 AM 0 0 0
Total 6 6 6
08:00 AM 1 1 1
08:15 AM 0 0 0
08:30 AM 0 0 0
08:45 AM 0 0 0
Total 1 1 1
09:00 AM 0 0 0
09:15 AM 0 0 0
09:30 AM 0 0 0
09:45 AM 0 0 0
Total 0 0 0
10:00 AM 0 0 0
10:15 AM 0 0 0
10:30 AM 0 0 0
10:45 AM 0 0 0
Total 0 0 0
11:00 AM 0 0 0
11:15 AM 0 0 0
11:30 AM 0 0 0
11:45 AM 0 0 0
Total 0 0 0
12:00 PM 0 0 0
12:15 PM 0 0 0
12:30 PM 0 0 0
12:45 PM 0 0 0
Total 0 0 0
01:00 PM 0 0 0
01:15 PM 0 0 0
01:30 PM 0 0 0
01:45 PM 0 0 0
Total 0 0 0
02:00 PM 0 0 0
02:15 PM 0 0 0
02:30 PM 0 0 0
02:45 PM 0 0 0
Total 0 0 0
03:00 PM 4 4 4
03:15 PM 0 0 0
03:30 PM 0 0 0
03:45 PM 0 0 0
Total 4 4 4

CITY OF SALINAS

TURNING MOVEMENT PROGRAM
File Name : S Hebbron Crosswalk 05-09
Site Code : N/A
Start Date : 5/9/202 4
Page No : 1
S Hebbron Crosswalk
Counted By: Cris
Weather: Sunny
Hours: 7:00am to 6:00pm
Groups Printed- Peds

HEBBRON
From North
Start Time PEDS App. Total Int. Total
04:00 PM 0 0 0
04:15 PM 0 0 0
04:30 PM 2 2 2
04:45 PM 1 1 1
Total 3 3 3
05:00 PM 0 0 0
05:15 PM 0 0 0
05:30 PM 0 0 0
05:45 PM 1 1 1
Total 1 1 1
Grand Total 15 15 15
Apprch % 100
Total % 100 100

CITY OF SALINAS

TURNING MOVEMENT PROGRAM
File Name : S Hebbron Crosswalk 05-09
Site Code : N/A
Start Date : 5/9/202 4
Page No : 2
S Hebbron Crosswalk
Counted By: Cris
Weather: Sunny
Hours: 7:00am to 6:00pm

HEBBRON
From North
Start Time PEDS App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 07:00 AM - Peak 1 of 1

CITY OF SALINAS

TURNING MOVEMENT PROGRAM
File Name : S Hebbron Crosswalk 05-09
Site Code : N/A
Start Date : 5/9/202 4
Page No : 3

← All documents from this meeting