DATE: OCTOBER 8, 2024
DEPARTMENT: PUBLIC WORKS DEPARTMENT
FROM: DAVID JACOBS, P.E., L.S., PUBLIC WORKS DIRECTOR
BY: PHAVANA ARAMKUL, JUNIOR ENGINEER
ADRIANA ROBLES, P.E., C.F.M., CITY ENGINEER
TITLE: 2022-2023 PAVEMENT MAINTENANCE PROJECT, CIP NO. 9981, 9120, 9080 RECOMMENDED MOTION:

A motion to approve a Resolution accepting the 2022-2023 Pavement Maintenance Project, CIP No. 9981, 9120, 9080 for maintenance and responsibility.

EXECUTIVE SUMMARY:

On May 16, 2023, City Council awarded the 2022-2023 Pavement Maintenance Project, CIP 9981, 9120, 9080, (Base Bids 1-7 and Additive Alternatives 1-2), to Granite Construction Company via Resolution No. 22661 for a contracted amount of $8,138,006.96 and authorized additional work in the amount of $852,363.78. Construction began on July 31, 2023, with an allowance of 126 working days for project completion. Granite Construction has completed pavement maintenance for 119 road segments under this contract, including 6 contract change orders, for a grand total of $8,990,370.74. Substantial completion was on March 22, 2024.

BACKGROUND:

On August 18, 2020, the City Council approved a contract with Pavement Engineering Inc. for on-going pavement condition surveys, updates to the Street Saver Pavement Management Program (PMP) database, and pavement condition reports (Resolution No. 21932). The last Pavement Management System Update was accepted by City Council on May 7, 2024 (Resolution No 22953). Public Works staff utilizes the Street Saver PMP for project level pavement analysis. It is a budgeting and inventory tool and a record for work history and pavement condition.

The City Engineer approved the project plans and specifications on February 23, 2023 and March 7, 2023, respectively, and authorized the call for bids for this project on March 8, 2023.

On April 7, 2023, City staff opened bids at a public meeting held via Zoom meeting from City Hall, at Salinas, California. The lowest responsive and responsible bidder Granite Construction Company submitted a bid that is 68% of the engineering estimate and was awarded a contract for $8,138,006.96 on May 16, 2023 via Resolution No. 22661.

Additionally, City Council approved a transfer of $1,200,000.00 Measure X Bond Funds from CIP 9981 – Street Preventive Maintenance Program to CIP 9080 – San Juan Grade Road Improvements to award Base Bid 1 and Additive Alternatives 1 and 2. A 10% contingency totaling $813,800.69 was allocated to the project.

The 2022-2023 Pavement Maintenance Project, in general, called for pavement mill and fill, installation of accessible curb ramps, curbs, gutters, pavement patch repairs, crack treatment, chip seal, slurry seal, hot mix asphalt (HMA) overlay, and installation of new signs and striping. Exhibit A, attached to this report, provides a location map and Table No. 1, below, identifies the streets that received a pavement treatment.

Table 1. Street Maintenance Segments
Street Name
Begin
End
Treatment
E Boronda Rd
N Main St
San Juan Grade
6" HMA Mill & Fill
San Juan Grade Rd
Russell Rd
400' N of Northridge Way
6" HMA Mill & Fill
Work Street
E Alisal St
Work Cir
6" HMA Mill & Fill
E Boronda Rd
N Sanborn Rd
Williams Rd
Chip Seal, Crack Seal, P/R
El Dorado Dr
E Boronda Rd
Harden Pkwy
Chip Seal, Crack Seal, P/R
Harden Pkwy
N Main St
Eldorado Dr
Chip Seal, Crack Seal, P/R
McKinnon St
E Alvin Dr
McKinnon St (N End)
Chip Seal, Crack Seal, P/R
N Davis Rd
W Rossi St
Boronda Crossing Pl / S Freeway Off Ramp
Chip Seal, Crack Seal, P/R
W Laurel Dr
N. Main St.

US 101 - On/Off Ramp
Crack Seal
Williams Rd
Del Monte Ave
E Boronda Rd
Chip Seal, Crack Seal, P/R
Alvarado Ct
Alvarado Dr
Alvarado Dr
Slurry Seal, Crack Seal
Alvarado Dr
Sherman Dr
End
Slurry Seal, Crack Seal
Arcadia Ct
Arcadia Way
Arcadia Way
Slurry Seal, Crack Seal
Arcadia Way
El Dorado Dr
Natividad Rd
Slurry Seal, Crack Seal
Arezzo Cir
Siena Way
End
Slurry Seal, Crack Seal
Arguello Cir.

Arguello Dr
End
Slurry Seal, Crack Seal
Arguello Dr
Sansome St
End
Slurry Seal, Crack Seal
Astor Cir
Astor Way
End
Slurry Seal, Crack Seal
Astor Way
Broadway Dr
Hudson Way
Slurry Seal, Crack Seal
Bologna Ct
Bologna Way
Bologna Way
Slurry Seal, Crack Seal
Bologna Way
Piazza Dr
Siena Way
Slurry Seal, Crack Seal
Buckingham Dr
Cascade Way
Arcadia Way
Slurry Seal, Crack Seal
Boyle Ct
Christensen Ave
Christensen Ave
Slurry Seal, Crack Seal
Broadway Dr
Pennsylvania Dr
Harden Pkwy
Slurry Seal, Crack Seal
Buckingham Cir
Buckingham Dr
End
Slurry Seal, Crack Seal
Street Name
Begin
End
Treatment
Buckingham Way
El Dorado Dr
Buckingham Dr
Slurry Seal, Crack Seal
Campania Cir
Palermo Dr
Campania Circle
Slurry Seal, Crack Seal
Campania Way
Palermo Dr
Campania Way WEST END
Slurry Seal, Crack Seal
Canelli Ct
Tuscany Blvd
Canelli Ct
Slurry Seal, Crack Seal
Capri Way
Piazza Dr
End
Slurry Seal, Crack Seal
Cascade Way
Klamath Dr
Buckingham Dr
Slurry Seal, Crack Seal
Cassino Cir.

Cassino Way
End
Slurry Seal, Crack Seal
Cassino Way
Spoleto St
Spoleto St
Slurry Seal, Crack Seal
Central Ave
Salinas St
Lincoln Ave
Slurry Seal, Crack Seal
Cesar Chavez Library Parking Lot
Williams Road
Bardin Way
Slurry Seal, Crack Seal, P/R
Chelsea Ct
Wimbledon Ave
Wimbledon Ave
Slurry Seal, Crack Seal
Christensen Ave
E Alvin Dr
Julia Ave
Slurry Seal, Crack Seal
Church St
W Gabilan St
W Alisal St
Slurry Seal, Crack Seal
Clinton Ct
Manhattan Dr
Clinton Ct / Clinton Ct (S End)
Slurry Seal, Crack Seal
Delancey Dr
Broadway Dr
End
Slurry Seal, Crack Seal
Dorset Way
Buckingham Dr
Lancashire Dr
Slurry Seal, Crack Seal
E Alisal St
N & S Sanborn Rd
Work St
Slurry Seal, Crack Seal, P/R
E Romie Lane
S Main St
Abbott St
Slurry Seal, Crack Seal
Ellis Cir
Fulton Way
End
Slurry Seal, Crack Seal
Emerald Dr
Arcadia Way
Emerald Way
Slurry Seal, Crack Seal
Essex Cir
Wimbledon Ave
End
Slurry Seal, Crack Seal
Essex Way
Arcadia Way
Wimbledon Ave
Slurry Seal, Crack Seal
Fell Cir
Fulton Way
End
Slurry Seal, Crack Seal
Flint Cir
Larkin St
END
Slurry Seal, Crack Seal
Freedom Pkwy
Tuscany Blvd
Padova Dr
Slurry Seal, Crack Seal
Fulton Way
Powell
Stockton St
Slurry Seal, Crack Seal
Geary Cir
Larkin St
End
Slurry Seal, Crack Seal
Genoa Cir
Genoa Way
End
Slurry Seal, Crack Seal
Genoa Way
Monte Bella Blvd
Arezzo Cir
Slurry Seal, Crack Seal
Greenbriar Way
Sansome St
End
Slurry Seal, Crack Seal
Greenwich Way
Sansome St
Arguello Dr
Slurry Seal, Crack Seal
Harvard Ct
Pennsylvania Dr
Pennsylvania Dr
Slurry Seal, Crack Seal
Howe Cir
Howe Dr
End
Slurry Seal, Crack Seal
Howe Dr
Sherman Dr
End
Slurry Seal, Crack Seal
Street Name
Begin
End
Treatment
Hudson Way
Manhattan Dr
End
Slurry Seal, Crack Seal
Julia Ave
Wheeler Dr
End
Slurry Seal, Crack Seal
Kearny Way
Larkin St
Alvarado Dr
Slurry Seal, Crack Seal
Kent Cir
Kent St
End
Slurry Seal, Crack Seal
Kent St
Klamath Dr
Arcadia Way
Slurry Seal, Crack Seal
Klamath Dr
Arcadia Way
365' SO Arcadia Way (COP)
Slurry Seal, Crack Seal
Lafayette Cir
Lafayette Wy
End
Slurry Seal, Crack Seal
Lafayette Wy
Delancey Dr
Broadway Dr
Slurry Seal, Crack Seal
Lancashire Cir
Lancashire Dr
End
Slurry Seal, Crack Seal
Lancashire Dr
Buckingham Dr
Cascade Way
Slurry Seal, Crack Seal
Larkin Cir
Larkin St
End
Slurry Seal, Crack Seal
Leese Dr
Sherman Dr
Alvarado Dr
Slurry Seal, Crack Seal
Lincoln Ave
W Market St
W Alisal St
Slurry Seal, Crack Seal
Manhattan Dr
Broadway Dr
McKinnon St
Slurry Seal, Crack Seal
Mason Way
Howe Dr
Larkin St
Slurry Seal, Crack Seal
Massolo Cir
Vicent Pl
End
Slurry Seal, Crack Seal
Massolo Ct
Vicent Pl (E)
Vicent Pl (W)
Slurry Seal, Crack Seal
Mill Way
Sansome St
Greenbriar Way
Slurry Seal, Crack Seal
Moderna St
Capri Way
End
Slurry Seal, Crack Seal
Moderna Way
Moderna St
Palermo Dr
Slurry Seal, Crack Seal
Nicole Cir
Boyle Ct
End
Slurry Seal, Crack Seal
O' Farrell Ct
Larkin St
Larkin St
Slurry Seal, Crack Seal
Oxford Ct
Wimbledon Ave
Wimbledon Ave
Slurry Seal, Crack Seal
Padova Dr
Palermo Dr
Freedom Pkwy
Slurry Seal, Crack Seal
Palermo Dr
Campania Cir
Monte Bella Blvd
Slurry Seal, Crack Seal
Pennsylvania Dr
McKinnon St
Dartmouth Wy
Slurry Seal, Crack Seal
Piazza Cir.

Piazza Dr
End
Slurry Seal, Crack Seal
Piazza Dr
Monte Bella Blvd
End
Slurry Seal, Crack Seal
Prescott Cir
Agruello Dr
End
Slurry Seal, Crack Seal
Princeton Cir
Princeton Ct
End
Slurry Seal, Crack Seal
Princeton Ct
Pennsylvania Dr (W)
Pennsylvania Dr (E )
Slurry Seal, Crack Seal
Rico Cir

LARKIN ST
END
Slurry Seal, Crack Seal
Rossano Ct
Palermo Dr
Palermo Dr
Slurry Seal, Crack Seal
Rossano Way
Rossano Ct
VENICE Way
Slurry Seal, Crack Seal
Sansome St
Rico St
W Rossi St
Slurry Seal, Crack Seal
Street Name
Begin
End
Treatment
Sardina Dr
BELLAGIO Way
Capri Way
Slurry Seal, Crack Seal
Sconberg Pkwy

ALISAL RD
Monte Bella Blvd
Slurry Seal, Crack Seal
Sherman Cir
Sherman Dr
End
Slurry Seal, Crack Seal
Sherman Dr
Larkin St
End
Slurry Seal, Crack Seal
Siena Way
Piazza Dr
End
Slurry Seal, Crack Seal
Spoleto Cir
Spoleto St
End
Slurry Seal, Crack Seal
Spoleto St
Cassino Way
End
Slurry Seal, Crack Seal
Spoleto Way
Canelli Ct
Spoleto St
Slurry Seal, Crack Seal
Stanyan St
Sansome St
Greenwich Way
Slurry Seal, Crack Seal
Stockton St
Powell
Rossi
Slurry Seal, Crack Seal
Stratford Ct
Emerald Dr
Emerald Dr
Slurry Seal, Crack Seal
Sutton Cir
Sutton Way
End
Slurry Seal, Crack Seal
Sutton Way
Delancey Dr
Delancey Dr
Slurry Seal, Crack Seal
Trivoli Way
Monte Bella Blvd
Campania Way
Slurry Seal, Crack Seal
Tuscany Cir.

Tuscany Way
End
Slurry Seal, Crack Seal
Tuscany Way
Tuscany Blvd
Cassino Way
Slurry Seal, Crack Seal
Van Buren Ave
Russell Rd
San Juan Grade
Slurry Seal, Crack Seal, P/R
Verona Ct
Verona Way
Piazza Dr
Slurry Seal, Crack Seal
Verona Way
Verona Ct
Monte Bella Blvd
Slurry Seal, Crack Seal
Vincent Pl
Rico St
Massolo Ct
Slurry Seal, Crack Seal
Wheeler Dr
E Alvin Dr
Christensen Ave
Slurry Seal, Crack Seal
Wimbledon Ave
Oxford Ct
Chelsea Ct
Slurry Seal, Crack Seal
Wimbledon Cir
Wimbledon Ave
End
Slurry Seal, Crack Seal
Wimbledon Way
Wimbledon Ave
Arcadia Way
Slurry Seal, Crack Seal
Yale Cir
Pennsylvania Dr
End
Slurry Seal, Crack Seal
Table 2 summarizes the project’s measurable outputs.

Table 2 Project Summary
Construction Activity Description
Quantity
Unit
Reconstruct Concrete Sidewalk
2,769
SF
Reconstruct Curb and Gutter
290
LF
Reconstruct ADA Curb Ramps
4 Each
Remove Street Trees
9 Each
6” HMA Mill & Fill Pavement Repairs
2 Miles
Pavement Maintenance
Chip Seal/Patch & Repair/Crack seal
10 Miles
Pavement Maintenance
Slurry Seal/Patch & Repair/Crack seal
19 Miles
On October 24, 2023, via Resolution No. 22819, City Council approved an additional 10% increase to the contract contingency of $881,868.50.

A total of six change orders totaling $852,363.78 were issued for a total construction cost of $8,990,370.74, as detailed on Table 3. A total of 16 additional working days were issued to complete the additional work requested. Contract change orders were approved in accordance with Department Policy 75-1, revised December 4, 2018.

Table 3: Contract Change Orders
Contract Change Order
Description
Working Days
Change Order Amount
Cumulative Contact Total
Contract
Base Bids 1-7 and Additive Alternatives 1-2
110
$8,138,006.96
CCO 1
Installation of Tire Rubber Modified Surface Sealer (TRMSS) at all chip seal locations 0 $430,678.35
$8,568,685.31
CCO 2
Distressed pavement areas originally located had expanded beyond the original limits, additional asphalt concrete repairs were identified at the various locations. 0 $236,436.00
$8,805,121.31
CCO 3
Add striping and signing plan to San Juan Grade Road paving (Base Bid 1). 0 $44,660.25
$8,849,781.56
CCO 4
The Contractor was directed to excavate and repair the tree root damage section underneath the existing asphalt concrete section at El Dorado Drive near Harden Parkway. 0 $57,697.37
$8,907,478.93
CCO 5
Balancing of contract items that exceeded bid quantities or were removed from the project. 0 $82,052.49
$8,989,531.42
CCO 6
Final balancing of contract items that exceeded bid quantities, removed from the project, additional work for Boronda Road manhole repairs, remobilization delays due to utility work conflicts, additional contract days for utility work and material shortage delays. 16 $839.32
$8,990,370.74
TOTAL
126
$852,363.78
$8,990,370.74
The project was funded through numerous funds including 2510 Measure X, 2511 SB1, 5202 Measure X Bonds, CIP 9080 San Juan Grade Road Improvements, CIP 9120 Monte Bella Subdivision Improvements (Maintenance District) and CIP 9329 Cesar Chavez Parking Lot.

The project was substantially completed on March 22, 2024.

The construction methods and materials met the Project Specifications as set forth by the contract documents and the project has been deemed complete.

CEQA CONSIDERATION:

Categorically exempt: The City of Salinas has determined that the project is exempt from the California Environmental Quality Act (CEQA) Guidelines (Section 1530l(c), Class 1), because the project proposes to maintain existing roadways, crosswalks, signage, and pavement striping.

Furthermore, the project does not qualify for any of the exceptions to the categorical exemptions found at CEQA Guidelines Section 15300.2 as all exceptions do not relate to the project scope of work for this project.

CALIFORNIA GOVERNMENT CODE §84308:

No, this project was advertised and competitively bid and is therefore exempt from California Government Code §84308. “Yes” or “No.” This section should indicate whether Government Code §84308/Levine Act applies to this item. Government Code §84308 generally applies to all contracts (other and competitively bid, labor, or personal employment contracts); all business, professional, trade, and land use licenses and permits and all other entitlement for use, including all entitlements for land use; and all franchises.

STRATEGIC PLAN INITIATIVE:

This project relates to the Council’s Goals of Infrastructure and Environmental Sustainability and Public Safety by improving / maintaining the City’s existing roadways and installing new striping and signage to enhance vehicular and pedestrian safety.

DEPARTMENTAL COORDINATION:

Public Works staff and Finance staff have worked together on the funding of the 2022-2023 Pavement Maintenance Project.

FISCAL AND SUSTAINABILITY IMPACT:

Accepting the 2022-2023 Pavement Maintenance Project (CIP 9981, 9120, 9080) for maintenance and responsibility has no direct fiscal impact. The project was constructed within its allocated budget and contingencies.

Fund
Appropriation
Appropriation
Name
Total Appropriation
Amount for recommendation
FY 24-25 CIP Budget Page
Last Budget Action (Date, Resolution)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
ATTACHMENTS:

Resolution
Exhibit A Location Map
Before/After Photos
Page | 3
Page | 1

CITY OF SALINASCOUNCIL STAFF REPORTCITY OF SALINASCOUNCIL STAFF REPORT

CITY OF SALINAS

COUNCIL STAFF REPORT

CITY OF SALINAS

COUNCIL STAFF REPORT

← All documents from this meeting