Cities Index.
Salinas_SWMP_City_Council prez_2025-03-11

Salinas City Council
March 11, 2025

Document
Salinas_SWMP_City_Council prez_2025-03-11
Meeting
March 11, 2025
Body
Salinas City Council
Original file
19.4 MB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
City of Salinas
October 2024
Stormwater Master Plan Update

PRESENTED TO CITY OF SALINAS CITY COUNCIL
MARCH 11, 2025
Wallace Group I DEDICATION TO SERVICE
, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
 Overview of the City’s Storm Drain System
 Purpose of the Master Plan
 Proposed Stormwater Projects
 Risks and Impacts
 Funding
 Questions

PRESENTATION AGENDA
Wallace Group I DEDICATION TO SERVICE
STO

RM DRAIN
SYSTEM

Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
Photo Credit: https://www8.honolulu.gov/swq/info-
resources/our-storm-water-system
• Pipes and channels
• Manholes
• Inlets
• Outfalls
Storm Drain Systems

Wallace Group I DEDICATION TO SERVICE
Photo Credit: https://www.vapar.co/manhole-meaning/
Storm Drain Manholes

Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
Photo Credit: https://www.centralmastormwater.org/municipalities/pages/municipal-resources Storm Drain Inlets

Wallace Group I DEDICATION TO SERVICE
Photo Credit: https://www.pca.state.mn.us/news-and-stories/ask-the-mpca-the-function-of-storm-drains Storm Drain Inlets

Wallace Group I DEDICATION TO SERVICE
Municipal Separate Storm Sewer System (MS4)
City of Salinas (MS4)
• Over 6,000 assets
• Over 145 miles of pipes,
culverts, and channels
Wallace Group I DEDICATION TO SERVICE
Stormwater Discharges
to Local Waterways

Wallace Group I DEDICATION TO SERVICE

PURPOSE

Of the SWMP

UNDERSTAND THE

CONDITION OF THE

EXISTING SYSTEM

IDENTIFY AND

PRIORITIZE

NECESSARY PROJECTS
Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
Understand the System

• TOPO AND

MAPPING
• STAFF

INTERVIEWS
• FIELD REVIEWS
Wallace Group I DEDICATION TO SERVICE
Understand the System

• TOPO AND MAPPING
• STAFF INTERVIEWS
• FIELD REVIEWS
Wallace Group I DEDICATION TO SERVICE
Understand the System

MODELING
• SURFACE RUNOFF
• UNDERGROUND INFRASTRUCTURE
Wallace Group I DEDICATION TO SERVICE
Identify & Prioritize Projects

Priority Ranking
 Flood Frequency
 Flood Severity
 Climate Resiliency
 Public Safety
 Critical Facilites
 Evacuation Routes
 High Traffic Roads
Wallace Group I DEDICATION TO SERVICE

PROPOSED PROJECTS

Photo Credit: https://www.thecalifornian.com/story/news/local/2024/10/22/california- water-infrastructure-improvements-new-wells-underway-in-salinas Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
Proposed Projects
Project Rankings
 High Priority
 Medium Priority
 Low Priority
 Maintenance
Wallace Group I DEDICATION TO SERVICE
High Priority Projects
• 18 Projects
• Known Problem Areas
• Sediment Removal
• New Inlets
• Focused Studies
• 12+ Million
Wallace Group I DEDICATION TO SERVICE
Photo Credit: https://www.thecalifornian.com/story/news/local/2024/10/22/california-water- infrastructure-improvements-new-wells-underway-in-salinas Medium Priority Projects
• 22 Projects
• Pipe Upgrades
• New Inlets
• $200+ Million
Low Priority Projects
• 23 Projects
• Pipe Upgrades
• New Inlets
• $100+ Million
Wallace Group I DEDICATION TO SERVICE

RISK AND IMPACTS

Wallace Group I DEDICATION TO SERVICE
Health and Safety
Wallace Group I DEDICATION TO SERVICE
Photo Credits:
https://www.ksbw.com/article/road-closed-outside-salinas-flooding-california https://salinasvalleytribune.com/winter-storm-triggers-evacuations-flooding-in-salinas-valley/ https://www.cityofsalinas.org/Your-Government/Departments/Salinas-Fire-Department Health and Safety
Wallace Group I DEDICATION TO SERVICE
Property Damage
Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
Pavement Damage
Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR

ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAM
Photo Credit:

LA Times, Ventura County Fire Department
Sinkholes
Wallace Group I DEDICATION TO SERVICE

ENGINEERING, HYDRAULIC MODELING & BIOLOGICAL MONITORING FOR ARROYO GRANDE CREEK WATERWAY MANAGEMENT PROGRAMDeferred Maintenance Can Contribute to Flooding

Wallace Group I DEDICATION TO SERVICE

FUNDING

Photo Credit: https://www.thecalifornian.com/story/news/local/2024/10/22/california-water-infrastructure- improvements-new-wells-underway-in-salinas
www.cleanwatersalinas.com
Business as Usual
Service rate:

Minimal proactive
repairs and no
proactive
replacement of
assets
Costs:

Cost is $101M
over 20 years with
no funding gap
Risk:

After 20 years,
1/3 of City assets
will be at very
high risk of failure
(currently 1/10)
www.cleanwatersalinas.com
Proposed Service Rate Increase:

Service rate:

Proactively
replace riskiest
assets, and
increase
maintenance and
repairs of others
Costs:

Cost is $237M
over 20 years,
requiring
additional
revenue of
$6.5M/year
Risk:

After 20 years, no
City assets will be
at very high risk of
failure (currently
1/10)
 CBP3 2021- Great opportunity; Leadership change
and lack of SW utility
 Urban Greening Grant 2022 - Green street project at
DAC Park; didn’t want multi-benefit
 NOAA Climate Resilience Challenge - Looking for
regional partnership; not “coastal” enough
 CW SRF - Principal forgiveness stormwater add-on to
currently funded corridor project; Timing challenges
 FEMA FMA - Lack of disaster insurance loss claims
Recent Funding
Opportunities Explored
Wallace Group I DEDICATION TO SERVICE

CONCLUSION

Photo Credit:

KION News 46
 Data is Power: Map, attribute and model
stormwater system
 Focus on multi-benefit project concepts in
DAC areas
 Educate and engage city leadership and
peers on the value of better managed
stormwater
 Research and understand funding
opportunities and challenges
 Work towards a stormwater utility fee
Salinas Strategy
Wallace Group I DEDICATION TO SERVICE
Photo Credit: https://salinascitycenter.com/
Questions?

← All documents from this meeting