Cities Index.
signed Revision 4.pdf

Salinas City Council
May 6, 2025

Document
signed Revision 4.pdf
Meeting
May 6, 2025
Body
Salinas City Council
Original file
74 KB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

MCI Job #

MOUNTAIN

CASCADE
ING.
555 Exchange Court Phone (925) 373-8370
Livermore, CA 94550 Main Fax (925) 373-0179
Estimator's Fax (925) 373-0940
PO Box 5050
Livermore, CA 94551

PROPOSAL
April 2, 2025
E2 Consulting Engineers, Inc.

Attn: Vinod Badani
PROJECT: TP1 And IWTF Facilities Improvements, Trash Capture, Segregated Stormwater Diversion and IWTF Electrical Improvements- Phase, 2A Proposal:
• Our Revised Number does not include the work associated with bid items 5, 6, 8, 11 16 and eighteen. • To complete this project with the we will also need a time extension for the electrical gear to be approved, fabricated and installed. This will stretch the construction schedule to 600 calendar Days to be completed.
• We also included a price for a slightly different Flygt pump as a cost savings. Flygt model NP3301 LT w/818 trim hard iron "N' Impeller.
• With this Flygt pump excluded field vibration testing to lower our proposal number.

Please see the Attached bid Schedule:

David Hicks
VP of Estimating
04/02/2025 Salinas TVT, Stormwater, Trash Capture
2025065
*** GLEN LAMOREAUX BID TOTALS
Biditem Description Status - Rnd Quantity Units Unit Price Bid Total 10000 Mobilization $600,000 Fixed F-New 1.000 600,000.00 600,000.00 20000 Demolition TP1 Stormwater Pump Station F-New 1.000 130,000.00 130,000.00 30000 Demolition of Existing TPI 48" F - New 1.000 14,000.00 14,000.00 40000 Structural Work For TP1 Storm Water Pump Station F- New 1.000 65,000.00 65,000.00 70000 Structural and at work @ IWTF Bldg. F- New 1.000 1,270,000.00 1,270,000.00 90000 Mechanical Work at the TP1 Stormwater P/S F- New 1.000 165,000.00 165,000.00 100000 Mechanical work for TP1 Valve Vault F - New 1.000 1,700,000.00 1,700,000.00 120000 Construct New Manhole over existing Pipe F - New 1.000 45,000.00 45,000.00 130000 Site Work at stormwater pump station F- New 1.000 40,000.00 40,000.00 140000 Site Work at the IWTF F- New 1.000 41,000.00 41,000.00 150000 Electrical & Instrumrntation TP1 F- New 1.000 1,100,000.00 1,100,000.00 170000 New elec. for the IWTF F- New 1.000 1,500,000.00 190000 Allow unmarked 50k F - New 1.000 50,000.00
200000 ExaCtor Salery ester me 25% F - New 1.000 25,000.00 210000 F- New 1.000 30,000.00
220000 Excavation Safety Measure IWTF • F- New 1.000 IS 20,000.00 230000 As build allow 15K F - New 1.000 LS 15,000.00
240000 Allow compliance for Permits 25K F- New 1.000 LS 25,000.00 Base Bid $6,835,000.00
04/02/2025 11:19
2025065 Salinas IWTF, Stormwater, Trash Capture
*** GLEN LAMOREAUX BID TOTALS
Biditem Description Status - Rnd Quantity Units Unit Price Bid Total 250000 Deductive Alt Bid Items 8 & 18 -1.000 IS
Alt Price Total $6,835,000.00
260000 Repair the pipe Line F - New 1.000 LS 78,000.00 78,000.00 265000 Construct Pipline A F- New 1.000 LS 137,000.00 137,000.00 Alt total $215,000.00
Bid Total $7,050,000.00