June 9, 2026 TO: Grant Leonard Planning Manager City of Salinas Community Development Department 65 West Alisal Street, 2nd Floor Salinas, CA 93901 [email protected] Re: Additional Service Request for Schematic Design of the Asian Cultural Experiences of Salinas Museum Dear Grant, We are pleased to present this additional service request to assist ACES in the schematic design of the Asian Cultural

Experiences

of

Salinas

Museum,

to

be

located

in

the

rehabilitated

former

Republic

Cafe

at

37-39

Soledad

Street

in

Salinas.

Schematic

design

will

be

built

upon

previous

programming

and

conceptual

design

activities

and

the

initial

floor

plan

accepted

by

the

City

on

02/10/2025,

but

will

adapt

these

materials

to

ACES’

operational

and

design

goals.

PROJECT LOCATION Former Republic Cafe, 37 Soledad St., Salinas, CA 93901 REFERENCES 37-39 Soledad Stakeholder Engagement meeting with Community stakeholders, TEF Design and City of Salinas, 10/27/2025
Current conceptual design floor plans reflecting minor revisions from conceptual design plans BACKGROUND AND PROJECT DESCRIPTION The Republic Cafe at 37 Soledad Street was designed and constructed in 1942 and owned by the prominent local Salinas

Chinatown

family

of

Wallace

Ahtye.

39 Soledad,

historically

the

Lotus

Inn,

is

directly

adjacent

the

Republic

Cafe

(with

a

shared

party

wall)

and

was

constructed

the

year

before

in

1941,

also

for

Wallace

Ahtye.

These

two

addresses

are

considered

one

building.

This

building

played

an

important

part

in

the

development

of

Salinas’

Chinatown.

39 Soledad

was

listed

in

the

National

Register

of

Historic

Places

in

2011,

and

is

a

State

and

local

landmark.

TEF

recently

prepared

a

Historic

Structure

Report

(HSR)

for

the

building

and

found

37 Soledad

also

eligible

for

listing

in

the

National

Register.

Both

addresses

were

recognized

as

historic

resources

in

the

Salinas

1989

Historical

and

Architectural

Resources

and

Survey

Plan. The City of Salinas Community Development Department has recently purchased the building. They have engaged

TEF

Design

for

completion

of

an

Historic

Structures

Report

(HSR)

(completed),

emergency

building

stabilization

including

structural

strengthening

and

addition

of

a

fire

protection

system

(submitted

for

permit),

and

building

rehabilitation

which

will

incorporate

future

uses

of

a

museum,

bar/restaurant,

residential

unit

and

office

suite

(design

in

progress).

Continues Next Page
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com

The intent of this proposal is to assist ACES in developing a clear concept for the Museum, a floor plan that supports

their

operational

needs,

an

interior

palette

of

finishes,

lighting

and

casework

that

complements

the

museum’s

collection,

and

renderings

that

could

be

used

to

fundraise

for

the

next

phases

of

the

project,

including

the

mounting

of

exhibits

and

operation

of

the

Museum.

Once

defined,

the

design

decisions

will

be

integrated

into

the

Schematic

Design

drawings

and

specifications.

SCOPE of SERVICES Our understanding of the scope of work and project assumptions is listed below. Any variance from the items outlined

below

may

require

a

revision

to

the

proposed

fees.

Task 1: Programming & Concept Design
The primary scope of work of this phase is a series of three (3) Stakeholder Engagement meetings with associated

prepared

materials

and

deliverables

listed

below.

Proposed

meetings

are

each

virtual

and

a

two-hour

duration.

Note that some physical material samples may need to be shared to support the proposed meetings. TEF will mail

physical

materials

to

the

City

of

Salinas

for

placement

in

a

location

where

stakeholder

participants

can

view

materials

in

advance

of

a

subsequent

meeting.

Meeting #1: Establish Floor Plan and Space Use Guidelines TEF brings: ● ACES Questionnaire (distributed in advance as a Google Form) ● Proposed program, floor plan and 3D views (white model) ACES brings: ● Completed questionnaires ● Examples of pieces in the ACES collection ● General description of artifact quantities Decisions made: ● Identify adjustments required to floor plan ● Identify types and quantities of artifacts to be displayed and stored ● Identify various uses of museum spaces Meeting #2: Establish Material Concept TEF brings: ● Revised floor plan and 3D views adjusted to reflect revisions (white model) ● 2-3 Preliminary material palette concepts and material types (precedent images) ● Preliminary diagram of millwork and furniture types and placement ACES brings: ● Report out on follow-ups from previous meeting, if any ● Review of notes from previous meeting and acknowledgement / acceptance of documented decisions Decisions made: ● Sign-off on floor plan ● Consensus around preferred material palette concept images and material types ● Consensus around millwork and furniture types and placement Continues Next Page 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Meeting #3: Select Material Palette TEF brings: ● Final floor plan ● 2-3 Material Palette proposals to include material samples, light fixture types, and use of the 3D model to

indicate

arrangement

of

materials

in

space
● Development of millwork to establish design intent at each location ACES brings: ● Report out on follow-ups from previous meeting, if any ● Review of notes from previous meeting and acknowledgement / acceptance of documented decisions Decisions made: ● Consensus around preferred material palette components and arrangement ● Consensus around millwork development Final Deliverables: ● Final Floor Plan ● Material Palette which includes: Interior finishes; Breakroom and restroom fixtures & finishes; Millwork finishes
● Millwork types, locations and preliminary design ● Light fixtures types and locations ● Three (3) rendered views showing final space configuration and materiality ● Cost estimate for rehabilitation of overall building will include this scope of work (cost estimating service

previously

approved

and

not

included

in

this

ASR)

Task 2: Schematic Design Documentation This task integrates decisions made during Programming and Concept Design into the Schematic Design drawings

and

specifications

so

that

project

documentation

reflects

the

design

intent

and

represents

an

accurate

basis

for

pricing.

Final Deliverables: ● Schematic Design drawings representing ACES’ preferred design, including floors plans and first floor reflected

ceiling

plan
● Schematic Design narrative, including basis of design specifications, representing ACES’ preferred design
SCHEDULE The work can begin upon approval. A nine week duration is anticipated with two weeks of preparation prior to each

Stakeholder

meeting

and

one

week

of

follow-up.

ASSUMPTIONS In determining TEF’s scope of work under this Agreement, TEF has made the following assumptions: 1. All studies shall comply with current codes. 2. Regular meetings shall be conducted online via Zoom. 3. TEF’s work will be drawn in REVIT software. 4. ACES museum will not inhabit any portion of 39 Soledad Contineus Next Page 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com EXCLUSIONS This Letter of Agreement specifically excludes the following: 1. Work related to the investigation or handling of Hazardous Materials. 2. Materials testing and inspections or selective demolition. 3. Geotechnical Investigations. 4. Site surveys outside those noted in Exhibit A, including but not limited to; utilities, topographic, floor leveling,

window

surveys,

etc.

5. In person meetings and/or site visits other than those described in the Scope of Work 6. Changes to previously approved work and/or work beyond the scope of this agreement. 7. Unreasonable delays in the progress of the work through no fault of TEF. 8. Coordination or provision of any engineering or design consultants not included in this proposal. 9. Field measuring of any existing spaces. 10. Preparation for, or attendance at, hearings before any commissions, boards or agencies. 11. Preparation of physical models or presentation renderings prepared by outside professional artists. 12. Furniture selection 13. Mechanical, electrical and plumbing design 14. Architectural phases of work other than Schematic Design 15. Signage and branding TEF would be pleased to provide written additional service proposals for any of these items, if requested, except for

Items

#1

through

#4.

FEES We propose to perform services on a percent complete basis to be invoiced monthly per the fee summary table below.

I

am

pleased

to

offer

my

services

on

a

pro-bono

basis,

you

will

see

that

reflected

in

the

detailed

task

and

fee

summary

-

included

as

Exhibit

A.

Fee Summary Table TEF Design Task 1: Programming and Concept Design $28,040 Task 2: Schematic Design Documentation $20,960 TOTAL $49,000 CONCLUSION Please feel free to contact me with questions or comments. Sincerely, Doug Tom, FAIA Principal TEF Architecture & Interior Design, Inc. ATTACHMENTS Exhibit A: Task & Fee Summary End of Document 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com

/0 /1 /2 □ /4 /5 /6 /7 /8 /9 /0 /10 /11 /12 □ /13 □ /14 /15 /16 /17 /11 □ /11 /16 /18 /18 /10 /17 /19 /20 □ /10 /21 /22 /23 /7 /24 /5 /22 /24 /25 /21 /26 /27 □ /11 /5 /21 /28 /7 /22 /5 /6 /10 /29 /1 /11 □ /18 /25 /6 /5 /25 /30 □ /26 /24 □ /31 /32 □ /11 /33 /27 /5 /34 /26 /34 /4 /26 /24 /5 /20 □ /35 /36 /37 /38 □ /40 □ /41 /42 /41 /43 /44 /45 /46 /47 /48 □ /50 /51 □ /44 /48 /52 /53 /54 /45 /48 /44 /55 /17 /15 /56 /17 /10 /18 /18 /57 /58 /56 □ /59 □ /29 /15 /58 /29 /1 /55 /0 □ /4 /1 /11 /57 /56 /58 /14 /15 /16 /17 /11 □ /13 □ /2 /1 /1 /11 /55 /21 /7 /9 /22 /7 /60 /26 /27 /17 /26 /24 /5 /55 /21 /33 /61 /5 /22 /24 /17 /26 /24 /5 /10 /21 /22 /23 □ /57 /57 /57 /17 /26 /24 /5 /0 /33 /24 /26 /27 /62 /63 /64 /63 /63 /18 /26 /9 /26 /8 /5 /21 /62 /65 /63 /63 /64 /63 /63 /62 /66 /67 /63 /64 /63 /63 /2 /5 /5 /0 /33 /24 /26 /27 /62 /65 /68 /69 /63 /70 /63 /64 /63 /63 /11 /29 /14 /1 /18 /10 /0 /57 /29 □ /4 /1 /11 /57 /56 /58 □ /4 /15 /29 /16 /18 /1 /58 /0 /10 /0 /57 /15 /58 /14 /15 /16 /17 /11 □ /13 □ /2 /1 /1 /11 /55 /21 /7 /9 /22 /7 /60 /26 /27 /17 /26 /24 /5 /55 /21 /33 /61 /5 /22 /24 /17 /26 /24 /5 /10 /21 /22 /23 □ /57 /57 /57 /17 /26 /24 /5 /0 /33 /24 /26 /27 /62 /63 /64 /63 /63 /18 /26 /9 /26 /8 /5 /21 /62 /65 /63 /63 /64 /63 /63 /62 /66 /67 /63 /64 /63 /63 /2 /5 /5 /0 /33 /24 /26 /27
/29 /15 /18 /71 /57 /58 /1 /4 □ /0 /15 /0 /10 /72 /62 /70 /67 /69 /63 /63 /63 /64 /63 /63 /73 /74 /75 /76 /75
/77 /78 /77 /73 /79 /80 /38 /38 □ /81 /82 /80 /83 /84 /79 /82 /85 /84 □ /81 /86 /87 /79 □ /74 /88 /89 /75 /78 □ /90 /37 /91 /92 /36 /93 /38 /84 □ /85 /80 /38 /85 /94 /80 /86 /37 /95 □ /85 /80/38 /84 /38 /37 /87 /94 /87 /86 /82 /37 □ /84 /92 /86 /93 /38 □ /93 /38 /91 /83 /96 □ /81 /82 /80 /83 /84 /79 /82 /85 /94 /87 /87 /38 /37 /93 /94 /37 /91 /38 □ /94 /37 /93 □ /97 /38 /38 /87 /86 /37 /95 □ /37 /82 /87 /38 /84 /78 /43 /98 /42 /78 /42 /42 /40 /98 /77 /96 /99 /42 /42 /78 /42 /42 /77 /41 /98 /41 /96 /41 /99 /42 /78 /42 /42 /98 /100 /96 /42 /99 /42 /78 /42 /42 /77 /78 /41 /101 /38 /102 /38 /92 /82 /85 □ /103 /36 /38 /84 /87 /86 /82 /37 /37 /94 /86 /80 /38 /78 □ /90 /37 /91 /92 /36 /93 /38 /84 □ /93 /80 /94 /104 /87 /86 /37 /95 □ /105 /36 /38 /84 /87 /86 /82/37 /84 /96 □ /93 /86 /84 /87 /80 /86 /106 /36 /87 /86 /82 /37 □ /94 /37 /93 □ /86 /37 /85 /36 /87 □ /94 /37 /94 /92 /107 /84 /86 /84 /78 /77 /98 /42 /78 /42 /42 /41 /98 /100 /42 /42 /78 /42 /42 /100/98 /108 /43 /42 /78 /42 /42 /98 /77 /96 /77 /43 /42 /78 /42 /42 /77 /78 /109 /101 /38 /102 /38 /92 /82 /85 □ /109 /101 □ /97 /82 /93 /38 /92 □ /94 /37 /93 □ /80 /38 /37 /93 /38 /80 □ /102 /86 /38 /81 /84 □ /36 /84 /86 /37 /95 □ /110 /79 /86 /37 /82 □ /94 /37/93 □ /89 /37 /84 /91 /94 /85 /38 /78 □ /90 /37 /91 /92 /36 /93 /38 /84 □ /93 /38 /102 /38 /92 /82 /85 /97 /38 /37 /87 □ /104 /80 /82 /97 /85 /80 /38 /92 /86 /97 /86 /37 /94 /80 /107 □ /81 /79 /86 /87 /38 □ /97 /82 /93 /38 /92 □ /102 /86 /38 /81 /84 □ /87 /79 /80 /82 /36 /95 /79 □ /104 /86 /37 /94 /92 □ /79 /86 /95 /79 □ /105 /36/94 /92 /86 /87 /107 □ /80 /38 /37 /93 /38 /80 /84 □ /81 /86 /87 /79 □ /87 /79 /80 /38 /38 □ /80 /82 /36 /37 /93 /84 □ /82 /104 /86 /37 /87 /38 /80 /97 /38 /93 /86 /94 /87 /38 □ /85 /80 /82 /91 /38 /84 /84 □ /80 /38 /37 /93 /38 /80 /84 /78 /41 /98 /42 /78 /42 /42 /43 /98 /77 /96 /41 /42 /42 /78 /42 /42 /100 /42 /98 /108 /96 /43 /42 /42 /78 /42 /42 /98 /99 /96 /99 /42 /42 /78 /42 /42 /77 /78 /100 /101 /38 /102 /38 /92 /82 /85 □ /111 /94 /87 /38 /80 /86 /94 /92 □ /112 /94 /92 /38 /87 /87 /38 /78 □ /90 /37 /91 /92 /36 /93 /38 /84 □ /94 /95 /95 /80 /38 /95 /94 /87 /86 /37 /95 □ /85/80 /38 /91 /38 /93 /38 /37 /87 □ /86 /97 /94 /95 /38 /84 /96 □ /85 /80 /82 /93 /36 /91 /87 □ /84 /94 /97 /85 /92 /38 /84 □ /94 /37 /93 /86 /37 /87 /38 /95 /80 /94 /87 /86 /37 /95 □ /97 /94 /87 /38 /80 /86 /94 /92 /84 □ /86 /37 /87 /82 □ /109 /101 □ /97 /82 /93 /38 /92 /100 /98 /42 /78 /42 /42 /77 /41 /98 /41 /96 /100 /42 /42 /78 /42 /42 /41 /42 /98 /109 /96 /99 /42 /42 /78 /42 /42 /98 /43 /96 /41 /42 /42 /78 /42 /42 /77 /78 /113 /101 /38 /102 /38 /92 /82 /85 □ /111 /86 /92 /92 /81 /82 /80 /83 □ /112 /94 /91 /83 /94 /95 /38 /78 □ /90 /37 /91 /92 /36 /93 /38 /84 □ /85 /80 /82 /93 /36 /91 /86 /37 /95 □ /94 □ /85/92 /94 /37 □ /93 /86 /94 /95 /80 /94 /97 □ /94 /37 /93 □ /93 /38 /102 /38 /92 /82 /85 /86 /37 /95 □ /97 /86 /92 /92 /81 /82 /80 /83 □ /87 /107 /85 /38 /84 /87 /79 /80 /82 /36 /95 /79 □ /109 /101 □ /97 /82 /93 /38 /92 □ /104 /80 /82 /97 □ /97 /94 /84 /84 /86 /37 /95 □ /87 /79 /80 /82 /36 /95 /79 □ /93 /38 /84 /86 /95 /37 □ /86 /37 /87 /38 /37 /87 /41 /98 /42 /78 /42 /42 /100 /98 /99 /42 /42 /78 /42 /42 /77 /43 /98 /109 /96 /42 /100 /42 /78 /42 /42 /98 /109 /96 /99 /100 /42 /78 /42 /42 /77 /78 /43 /101 /38 /102 /38 /92 /82 /85 □ /114 /86 /95 /79 /87 □ /115 /86 /116 /87 /36 /80 /38 □ /112 /94 /91 /83 /94 /95 /38 /117 □ /90 /37 /91 /92 /36 /93 /38 /84 □ /94 /95 /95 /80 /38 /95 /94 /87/86 /37 /95 □ /92 /86 /95 /79 /87 □ /104 /86 /116 /87 /36 /80 /38 □ /82 /85 /87 /86 /82 /37 /84 /77 /98 /42 /78 /42 /42 /100 /98 /99 /42 /42 /78 /42 /42 /100 /98 /108 /43 /42 /78 /42 /42 /98 /77 /96 /113/43 /42 /78 /42 /42 /77 /78 /108 /88 /82 /82 /80 /93 /86 /37 /94 /87 /86 /82 /37 /96 □ /97 /38 /38 /87 /86 /37 /95 /84 □ /94 /37 /93 □ /85 /80 /82 /118 /38 /91 /87 □ /94 /93 /97 /86 /37 /86 /84 /87 /80 /94 /87 /86 /82/37 /42 /98 /42 /78 /42 /42 /77 /41 /98 /41 /96 /100 /42 /42 /78 /42 /42 /42 /98 /42 /78 /42 /42 /98 /41 /96 /100 /42 /42 /78 /42 /42 /77 /43 /98 /42 /78 /42 /42 /100 /40 /98 /40 /96 /99 /42 /42 /78 /42 /42 /40 /43 /98 /77 /99 /96 /41 /100 /42 /78 /42 /42 /73 /74 /75 /76 /75
/41 /78 /77 /90 /37 /87 /38 /95 /80 /94 /87 /86 /82 /37 □ /82 /104 □ /91 /82 /37 /91 /38 /85 /87 □ /93 /38 /84 /86 /95 /37 □ /82 /36 /87 /91 /82 /97 /38 /84 □ /86 /37 /87 /82 □ /75 /91 /79 /38/97 /94 /87 /86 /91 □ /101 /38 /84 /86 /95 /37 □ /93 /80 /94 /81 /86 /37 /95 /84 /41 /98 /42 /78 /42 /42 /77 /43 /98 /109 /96 /41 /42 /42 /78 /42 /42 /109 /41 /98 /43 /96 /42 /99 /42 /78 /42 /42 /98 /40/96 /41 /99 /42 /78 /42 /42 /41 /78 /41 /41 /98 /42 /78 /42 /42 /77 /41 /98 /41 /96 /100 /42 /42 /78 /42 /42 /109 /41 /98 /43 /96 /42 /99 /42 /78 /42 /42 /98 /99 /96 /100 /99 /42 /78 /42 /42 /41 /78 /109 /103 /74 /119 /103 /88 □ /80 /38 /102 /86 /38 /81 /41 /98 /42 /78 /42 /42 /99 /98 /77 /96 /43 /42 /42 /78 /42 /42 /42 /98 /42 /78 /42 /42 /98 /77 /96 /43 /42 /42 /78 /42 /42 /41 /78 /100 /88 /82 /82 /80 /93 /86 /37 /94 /87 /86 /82 /37 /96 □ /97 /38 /38 /87 /86 /37 /95 /84 □ /94 /37 /93 □ /85 /80 /82 /118 /38 /91 /87 □ /94 /93 /97 /86 /37 /86 /84 /87 /80 /94 /87 /86 /82/37 /42 /98 /42 /78 /42 /42 /99 /98 /77 /96 /43 /42 /42 /78 /42 /42 /42 /98 /42 /78 /42 /42 /98 /77 /96 /43 /42 /42 /78 /42 /42 /43 /98 /42 /78 /42 /42 /100 /100 /98 /99 /96 /99 /42 /42 /78 /42 /42 /43 /100 /98 /77 /41 /96 /77 /43 /42 /78 /42 /42 /98 /41 /42 /96 /40 /43 /42 /78 /42 /42 /90 /37 /87 /38 /95 /80 /94 /87 /86 /82 /37 □ /82 /104 □ /91 /82 /37 /91 /38 /85 /87 □ /93 /38 /84 /86 /95 /37 □ /85 /80 /82 /93 /36 /91 /87 /84 □ /94 /37 /93 □ /97 /94 /87 /38 /80 /86 /94 /92/84 □ /120 /86 /78 /38 /78 □ /104 /86 /37 /86 /84 /79 /38 /84 /96 □ /97 /86 /92 /92 /81 /82 /80 /83 /96 □ /92 /86 /95 /79 /87 /86 /37 /95 /121 /96 □ /86 /37 /87 /82

← All documents from this meeting