Town Council
525 San Anselmo Avenue
San Anselmo, CA 94960
Agenda
Meetings held virtually via Zoom until
further notice
Tuesday, August 23, 2022 7:00 PM
https://us02web.zoom.us/j/87490306845
Or Telephone: +1 669 900 6833 | Webinar ID: 874 9030 6845 How to Submit Comments Before the Meeting: Members of the public are encouraged to submit email correspondence to [email protected] before the meeting begins.
How to Participate During the Meeting: Members of the public will have the option to speak during the meeting through the Zoom application by using their phone or an electronic device.
For PC, Mac, or smart phone, Use “Raise hand” function when public comment for an item is requested. It is a button that is located at the top or bottom of your screen, based on your computer For landline phones, raise hand to be recognized with *9
1. 6:20 PM Interviews with Applicants to the Racial Equity Committee, Historical Commission and Art Commission
Staff Report
Attachment 1 - April A. Hewes
Attachment 2 - Alan S. Cascio
Attachment 3 - Grace Hyeryung Kim
Attachment 4 - Kathleen Edwards
Attachments:
Call to Order. Optional Pledge of Allegiance: The Mayor or a designated Council member will recite the Pledge of Allegiance for members of the Council and the public who wish to join in the recitation.
1 Town Council Agenda August 23, 2022
Open time for public expression.
The public is welcome to address the Council at this time on matters not on the agenda that are within the jurisdiction of the Council. Please be advised that pursuant to Government Code Section 54954.2, Council is not permitted to discuss or take action on any matter not on the agenda unless it determines that an emergency exists, or that there is a need to take immediate action which arose following posting of the agenda. Comments may be no longer than three minutes and should be respectful to the community.
Council requests for future agenda items.
Council committee liaison reports, questions and comments to staff; staff miscellaneous items.
Consent Agenda:
The opportunity for public comment on consent agenda items will occur prior to Council discussion of the consent agenda. The Council may approve the entire consent agenda with one action. In the alternative, items on the consent agenda may be removed by any Council or staff member, for separate discussion and vote.
2.1. Minutes of July 26, 2022
Attachments: Attachment 1 - July 26, 2022 Minutes
2.2. Report of Warrants Issued, July 2022
Staff Report
Attachment 1 - Warrant Report_July 2022
Attachments:
2.3. Consider Adoption of Resolution to Allow for Virtual Town Council Meetings in Compliance with AB 361.
Staff Report
Attachment 1 - Resolution
Attachments:
2.4. Response to 2021-2022 Marin Civil Grand Jury Report entitled Electrifying Marin’s Buildings: A Countywide Approach
Staff Report
Attachment 1 - Grand Jury Report
Attachment 2 - Responses to Grand Jury Report
Attachments:
2 Town Council Agenda August 23, 2022
2.5. Authorization to Sign an Agreement with Sage Energy Consulting and Request for Resilience Hub Consultant Funds
Staff Report
Attachment 1 - SAGE Master Services Agreement
Attachment 2 - Task Order 1_Interconnection Application Attachment 3 - Task Order 2_Feasibility Study
Attachment 4 - Public Comment
Attachments:
2.6. Consider rescheduling the November 8, 2022 Town Council meeting.
Attachments: Staff Report
Council Items:
3. Proposed Hilldale Pocket Park Project
Staff Report
Attachment 1 Hilldale Park Survey Results.pdf
Attachment 2 Proposed Pocket Park Plan.pdf
Attachments:
4. San Anselmo Community Gardens Draft Bylaws and Rules Staff Report
Attachment 1 - Draft San Anselmo Community Garden Bylaws {8.17.22}
Attachment 2 - Draft San Anselmo Commmunity Garden Rules {8.17.22}
Attachment 3 - Letters to Parks & Recreation Commission Attachment 4 - Further Public Comment
Attachments:
5. Consider Adoption of Resolution Defining the Framework for the San Anselmo Arts Commission
Staff Report
Attachment 1 - Arts Commission Reso 4313 FINAL 8.23.22 - Staff Attachment 2 - Arts Commission Reso 4313 FINAL 8.23.22 - Arts Comm
Attachment 3 - Arts Commission Letter revised 6-29-2022 for 8-23-2022 TC Meeting
Attachments:
3 Town Council Agenda August 23, 2022
6. Town Council Committee Assignment Discussion
Staff Report
Attachment 1 - Committee Assignments - Councilmember Burke Submission
Attachments:
7. Discussion of Potential Regulations Imposing an Electric Vehicle Infrastructure Training Program (EVITP) Certification Requirement for Town-Funded Electric Vehicle Infrastructure Projects
Staff Report
Attachment 1 Rohnert Park EVITP Ordinance_No._968.pdf
Attachments:
8. Discuss ongoing format for public meetings
Attachments: Staff Report
Adjourn
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact Town Staff at email [email protected]. Notification at least 48 hours prior to the meeting will enable the Town to make reasonable accommodation to help insure accessibility to this meeting.
Any writings or documents provided to a majority of the Town Council regarding any item on this agenda after the distribution of the original packet will be made available for public inspection at the public counter at Town Hall located at 525 San Anselmo Avenue.
Notice is hereby given that Council may discuss and/or take action on any or all of the items listed on this agenda. If any of these matters above are challenged in court, you may be limited to raising only those issues you or someone else raised at any public hearing described on this agenda, or in written correspondence delivered at, or prior to, this Council meeting. Judicial review of an administrative decision of the Town Council must be filed with the Court not later than the 90th day following the date of the Council’s decision (Code of Civil Procedure Section 1094.6) Any item not under discussion before 10:00 p.m. may be continued to the next regular meeting. Next regular meeting is Tuesday, September 13, 2022.
I certify that this agenda was posted on the Public Notice Bulletin Board on or before Friday, August 19, 2022
____________________________
Carla Kacmar, Town Clerk
4 Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 1.
SUBJECT:
6:20 PM Interviews with Applicants to the Racial Equity Committee, Historical Commission and Art Commission
Racial Equity Committee Interview:
April A. Hewes
Historical Commission Interview:
Alan S. Cascio
Art Commission Interviews:
Grace Hyeryung Kim
Kathleen Edwards
Town of San Anselmo Page 1 of 1 Printed on 8/18/2022
powered by Legistar™ 5
Print
TOWN OF SAN ANSELMO
APPLICATION FOR APPOINTMENT TO A SAN ANSELMO BOARD/COMMISSION/COMMITTEE To: San Anselmo Town Council
Date*
08/16/2022
I wish to apply for an
appointment to a term/balance*
Name*
April A Hewes
Home Address*
25 Kensington Court,
Occupation*
Social Worker/Chaplain/Dmin Student
Employer's Address
105 Seminary Road
Home Phone*
8017501191
Work Phone
4154512806
Boards & Committee Applications - Submission #1629
Date Submitted: 8/16/2022
Racial Equity Committee
ITEM 1 ATTACHMENT 1 ITEM 1 ATTACHMENT 1
6 Cell Phone
8017501191
E-Mail*
[email protected]
Number of years as resident of San Anselmo*
7 Number of years as a resident in Marin*
7 Education Level Achieved*
Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:
1.) Name*
Dean Hansen
1.) Phone*
415-451-2806
2.) Name*
Heidi
2.) Phone*
415-716-6707
3.) Name*
Chris Oker
3.) Phone*
415-451-2859
YES
NO
I would be able to regularly attend the meetings of this Board/Commission/Committee.* YES
NO
I would be available to attend additional meetings when they are necessary.* Graduate Degree (Major)
ITEM 1 ATTACHMENT 1
ITEM 1 ATTACHMENT 1
7 YES
NO
I am familiar with the responsibilities and functions of this Board/Commission/Committee.* YES
NO
I have attended meetings of the Board/Commission/Committee as a member of the public.* List briefly, previous experience serving the public office, and/or civic commissions,boards, or committees.* Former experience in Salt Lake City, Utah from 1994-2015.
Reasons for this appointment.*
I want to make a positive difference in my community
What are your qualifications for this appointment.*
I serve on a few different boards/committees with The University of Redlands, Marin Campus for diversity, equity, and inclusion. I also have past experience in similar areas.
Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?* According to Data USA (https://datausa.io/profile/geo/marin-county-ca) The 5 largest ethnic groups in Marin County are White/Non-Hispanic 70.9%, White Hispanic 7.94%, Other Hispanic 6.92%, Asian Not Hispanic
6.33% and 2+ Non-Hispanic 3.5%. The disparity between each exists yet are often not seen, over looked, and or ignored.
YES
NO
I understand that I and all other applicants will be personally interviewed by the Town Council as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.*
Other Boards/Commissions/Committees on which you would be interested in serving if not appointed to this seat?* You may attach personal resumes or other information which you believe would be helpful to the Council in its selection process.
Choose File No file chosen
Thank you for your interest in serving the Town of San
Anselmo and its citizens. For further information, please contact the Town Clerk, at
[email protected] or 415-258-4660.
None
ITEM 1 ATTACHMENT 1
ITEM 1 ATTACHMENT 1
8 Print
TOWN OF SAN ANSELMO
APPLICATION FOR APPOINTMENT TO A SAN ANSELMO BOARD/COMMISSION/COMMITTEE To: San Anselmo Town Council
Date*
August 16, 2022
I wish to apply for an
appointment to a term/balance*
Name*
Alan S Cascio
Home Address*
53 GROVE LN
Occupation*
retired
Employer's Address
53 GROVE LN
Home Phone*
14152461783
Work Phone
Boards & Committee Applications - Submission #1630
Date Submitted: 8/16/2022
Historical Commission
ITEM 1 ATTACHMENT 2 ITEM 1 ATTACHMENT 2
9 Cell Phone
E-Mail*
[email protected]
Number of years as resident of San Anselmo*
37 Number of years as a resident in Marin*
37 Education Level Achieved*
Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:
1.) Name*
Danny Krebs
1.) Phone*
415-290-0708
2.) Name*
Mark Fogelman
2.) Phone*
415-747-9711
3.) Name*
Byron Huang
3.) Phone*
415-948-9918
YES
NO
I would be able to regularly attend the meetings of this Board/Commission/Committee.* YES
NO
I would be available to attend additional meetings when they are necessary.* Graduate Degree (Major)
ITEM 1 ATTACHMENT 2
ITEM 1 ATTACHMENT 2
10 YES
NO
I am familiar with the responsibilities and functions of this Board/Commission/Committee.* YES
NO
I have attended meetings of the Board/Commission/Committee as a member of the public.* List briefly, previous experience serving the public office, and/or civic commissions,boards, or committees.* I have served on this commission for many years
Reasons for this appointment.*
reappointment
What are your qualifications for this appointment.*
I love history!
Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?* This is an amazing commission that fully fulfils its mission. The Members all get along and are fully engaged.
YES
NO
I understand that I and all other applicants will be personally interviewed by the Town Council as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.*
Other Boards/Commissions/Committees on which you would be interested in serving if not appointed to this seat?* You may attach personal resumes or other information which you believe would be helpful to the Council in its selection process.
Choose File No file chosen
Thank you for your interest in serving the Town of San
Anselmo and its citizens. For further information, please contact the Town Clerk, at
[email protected] or 415-258-4660.
None
ITEM 1 ATTACHMENT 2
ITEM 1 ATTACHMENT 2
11 Print
TOWN OF SAN ANSELMO
APPLICATION FOR APPOINTMENT TO A SAN ANSELMO BOARD/COMMISSION/COMMITTEE To: San Anselmo Town Council
Date*
8/16/22
I wish to apply for an
appointment to a term/balance*
Name*
Grace Hyeryung Kim
Home Address*
35A Seminary rd unit A
Occupation*
Doctor of Ministry at SFTS student and Minster.
Employer's Address
105 Seminary rd, San Anselmo
Home Phone*
4157305006
Work Phone
Boards & Committee Applications - Submission #1632
Date Submitted: 8/16/2022
Art Commission
ITEM 1 ATTACHMENT 3 ITEM 1 ATTACHMENT 3
12 Cell Phone
4157305006
E-Mail*
[email protected]
Number of years as resident of San Anselmo*
12years
Number of years as a resident in Marin*
12years
Education Level Achieved*
Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:
1.) Name*
Jeremiah Jankins
1.) Phone*
4076258455
2.) Name*
Eungene Park
2.) Phone*
415-235-6472
3.) Name*
Neddy Yong
3.) Phone*
2139445207
YES
NO
I would be able to regularly attend the meetings of this Board/Commission/Committee.* YES
NO
I would be available to attend additional meetings when they are necessary.* Graduate Degree (Major)
ITEM 1 ATTACHMENT 3
ITEM 1 ATTACHMENT 3
13 YES
NO
I am familiar with the responsibilities and functions of this Board/Commission/Committee.* YES
NO
I have attended meetings of the Board/Commission/Committee as a member of the public.* List briefly, previous experience serving the public office, and/or civic commissions,boards, or committees.* I was a SFTS school event boards member.
I am currently Disciples of Chirst diverse culture community board memver.
Reasons for this appointment.*
I moved here from South Korea in 2010 and stay here for 12 years with my kids. My kids are born in here and growing. SA is my second home town and first home town for my kids.
What are your qualifications for this appointment.*
I love SA
I know SA
I live in here with diverse culture and language, it can give a good influence to creat divirsity and harmony community
I and my kids have art spirit. We are all artist, musician and writer.
Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?* Art is life.
Art can provide healing and resilience. I am a pastoral care provider and use art as a tools for healing and caring.
Also art needs to understand culture, enviorment, and thoughts.
SA is almost diverse community, we need learn more about our diversity.
YES
NO
I understand that I and all other applicants will be personally interviewed by the Town Council as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.*
Other Boards/Commissions/Committees on which you would be interested in serving if not appointed to this seat?* You may attach personal resumes or other information which you believe would be helpful to the Council in its selection process.
SA town hall -1.docx
Racial Equity Committee
ITEM 1 ATTACHMENT 3
ITEM 1 ATTACHMENT 3
14 Thank you for your interest in serving the Town of San Anselmo and its citizens. For further information, please contact the Town Clerk, at
[email protected] or 415-258-4660.
ITEM 1 ATTACHMENT 3
ITEM 1 ATTACHMENT 3
15 Print
TOWN OF SAN ANSELMO
APPLICATION FOR APPOINTMENT TO A SAN ANSELMO BOARD/COMMISSION/COMMITTEE To: San Anselmo Town Council
Date*
August 16 2022
I wish to apply for an
appointment to a term/balance*
Name*
Kathleen Edwards
Home Address*
8 Medway Rd
Occupation*
artist
Employer's Address
Home Phone*
4152992024
Work Phone
Boards & Committee Applications - Submission #1631
Date Submitted: 8/16/2022
Art Commission
ITEM 1 ATTACHMENT 4 ITEM 1 ATTACHMENT 4
16 Cell Phone
E-Mail*
[email protected]
Number of years as resident of San Anselmo*
22 Number of years as a resident in Marin*
29 Education Level Achieved*
Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:
1.) Name*
Steve Unze
1.) Phone*
4152991028
2.) Name*
Mary Porter
2.) Phone*
4155056892
3.) Name*
Jane Cunningham
3.) Phone*
4157175009
YES
NO
I would be able to regularly attend the meetings of this Board/Commission/Committee.* YES
NO
I would be available to attend additional meetings when they are necessary.* Graduate Degree (Major)
ITEM 1 ATTACHMENT 4
ITEM 1 ATTACHMENT 4
17 YES
NO
I am familiar with the responsibilities and functions of this Board/Commission/Committee.* YES
NO
I have attended meetings of the Board/Commission/Committee as a member of the public.* List briefly, previous experience serving the public office, and/or civic commissions,boards, or committees.* I have been a member of the Arts Commission for 3 years and am now co-chair.
Reasons for this appointment.*
Serving on the Commission has been a great experience and I'm involved in a number a number of projects with the Commission that I would very much like to continue working on.
What are your qualifications for this appointment.*
I'm a professional artist which gives me high skills in the visual arts realm. https://www.kathleenedwardsartist.com/ Because of that, I've been able to directly shepherd such projects as the Utility Box Public Art Project and participate on the Arts Scholarships subcommittee.
Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?* We have working for about 3 years now on the process for the Public Art Resolution to allow murals in town.
The eventual passage of this would hopefully open the door for some amazing public arts projects in town.
And now that we were able to have our Beatles fundraiser this year, we are looking forward to launching some new projects.
YES
NO
I understand that I and all other applicants will be personally interviewed by the Town Council as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.*
Other Boards/Commissions/Committees on which you would be interested in serving if not appointed to this seat?* You may attach personal resumes or other information which you believe would be helpful to the Council in its selection process.
Choose File No file chosen
Thank you for your interest in serving the Town of San
Anselmo and its citizens. For further information, please contact the Town Clerk, at
[email protected] or 415-258-4660.
Climate Action Commission
ITEM 1 ATTACHMENT 4
ITEM 1 ATTACHMENT 4
18 1
San Anselmo Council Minutes
Regular Meeting
Town Council Chambers and Via teleconference
Tuesday, July 26, 2022
Mayor Fineman called the Regular meeting to order at 7:00 p.m.
Call to Order: Optional Pledge of Allegiance
COUNCILMEMBERS PRESENT: Alexis Fineman, Mayor
Steve Burdo, Vice-Mayor
Eileen Burke
Ford Greene
COUNCILMEMBERS ABSENT: Brian Colbert
STAFF MEMBERS PRESENT: Dave Donery, Town Manager
Megan Acevedo, Town Attorney
Linda Kenton, Assistant Town Manager
Jeffrey Zuba, Finance Director
Open Time for Public Expression
Mr. David Hall, representing the Marin/Sonoma Building Electrification Squad, stated the June 6th Civil Grand Jury Report calls for the electrification of Marin’s buildings to reduce the risk to public health and safety and to help eliminate greenhouse gases.
Ms. Sue Saunders stated there is money “raining down from the state” to electrify transportation and homes. She discussed tax credits and other incentives.
Council committee liaison reports, requests for future agenda items, questions and comments to staff; staff miscellaneous item
Councilmember Burke reported the Housing Element Advisory Committee has held two meetings and one public meeting; she attended the on-line and in-person meetings related to the Hillsdale “Pocket Park”.
Vice Mayor Burdo reported the Ross Valley Fire Board met on July 13th and approved several Memorandums of Understanding (MOUs) and selected the group “Local Motion” as consultants for the upcoming Leadership Study; he attended Saturday night’s Beatles Night at Creek Park with kudos to Town staff; he asked staff to post information on the Town Website about incentives and rebates mentioned by Ms. Saunders.
Mayor Fineman reported she attended a meeting with various stakeholders regarding ongoing tree work performed by PG&E; Beatles in the Park was a fantastic event; she asked residents to report the use of fireworks; she attended the Community Pride Event co-sponsored by the SPAR Center; the Climate Action Commission met last night; the Town recently adopted a Leaf Blower Ordinance.
Councilmember Greene reported he was contacted by several residents regarding retooling of eligibility for the garden plots at Robson Harrington. Vice Mayor Burdo stated the Parks and Recreation Commission would be discussing this at its next meeting.
ITEM 2.1 ATTACHMENT 1 ITEM 2.1 ATTACHMENT 1
19 2
Town Manager Donery introduced Community Engagement Coordinator Kelly Warner. She has hit the ground running!
1. Consent Agenda
1.1 Approve Minutes of June 28, 2022
1.2 Report of Warrants Issued, June 2022
1.3 Quarterly Treasurer’s Investment Report, June 30, 2022
1.4 Consider Adoption of Resolution to Allow for Virtual Town Council Meetings in Compliance with AB 361.
1.5 Canvass of Returns of June 7, 2022 Election
1.6 Resolution Adopting the Proposed Memorandum of Understanding with the Service Employees International Union, Local 1021 (SEIU) for the period of July 1, 2022 to June 30, 2025.
1.7 That Town Council approve the attached Resolution setting Management and Confidential Employees pay rates effective July 1, 2022, and Part-time Employee pay Rates effective July 1, 2022
1.8 Climate Action Update
1.9 Request to Support California’s Current Net Energy Metering Program (NEM 2.0)
1.10 Accept the Sir Francis Drake (SFD) Boulevard Pavement Rehabilitation Project (the Hub to Bolinas Avenue)
1.11 Award the 2022 Street Resurfacing Project
1.12 2023 Street Resurfacing Project Design Consultant Contract Mayor Fineman opened the meeting to public comments.
There were no comments.
Mayor Fineman closed the meeting to public comments.
M/s, Burdo/Greene, Motion to approve the Consent Agenda as submitted.
AYES: Burdo, Burke, Colbert, Greene, Mayor Fineman
Council Items
2. Public Hearing to Consider Placing a Sales Tax on the November 8, 2022 General Election Ballot
Finance Director Zuba presented the staff report and a PowerPoint presentation that included the following: 1) Sales Tax Measure Renewal; 2) Revisions to Ballot Questions from June 28th; 3) Recommendation.
ITEM 2.1 ATTACHMENT 1 ITEM 2.1 ATTACHMENT 1
20 3
Town Manager Donery stated if the Council decides to move forward then staff would get the necessary documents to the Marin County Elections Department by August 12th including the ballot language, “argument for”, and the impartial analysis from the attorney. Staff answered questions from the Council regarding the process for appointing a Council subcommittee to write the ballot and argument language; how the “group of signatories” works; if the subcommittee would write the response to the rebuttal; if Councilmembers on the subcommittee can use their Council email addresses to communicate; Fire Department staffing levels; the deadline in terms of the ability to use public resources.
Mayor Fineman opened the meeting to public comments.
Kathleen Gundy, representing the Climate Action Commission, stated the Commission voted in support of adding climate mitigation and adaptation to the Measure C Statement of Intent.
There is a heightened priority of the twin climate risks of fire and drought.
Mayor Fineman closed the meeting to public comments.
Councilmember Greene supported the Climate Action Commission’s request and stated it was very appropriate. Adding language to a “Whereas” would not impact the legal viability of the ballot statement. He volunteered to be on the subcommittee.
Councilmember Burke stated the argument in favor of the measure should include the following information: 1) How much is the increase?; 2) Is this a cap (as high as it can go)?; 3) What services will be included? She referred to the request from the Climate Action Commission and agreed with Councilmember Greene about the “Whereas” language. She disagreed with changing the intent and use of the funds- this has been thoroughly vetted.
Vice Mayor Burdo discussed what should be defined in the ballot language and recitals. He noted use of the funds is broadly defined in the ballot language and he was not sure how specific it should get. He supported the requests from the Climate Action Commission.
Mayor Fineman liked the new language in the revised ballot statement. She noted a change that should be made on page 2 of the ordinance. She supported modifying the “Whereas” language. She volunteered to serve on the subcommittee.
The Council discussed the reasons why the Town needs more money including fire vulnerability.
Councilmember Greene asked staff to provide the deadlines/calendar for completion and submittal of arguments, etc.
M/s, Burke/Greene, Motion to adopt the resolution with the insertion of the following in the “Whereas” section after the reference to the historic downtown: “A healthy, livable climate”.
AYES: Burdo, Burke, Greene, Mayor Fineman
ABSENT: Colbert
M/s, Greene/Burdo, Motion to approve the ordinance for public consideration.
AYES: Burdo, Burke, Greene, Mayor Fineman
ABSENT: Colbert
Mayor Fineman appointed herself and Councilmember Greene to the subcommittee to draft the “arguments in favor” as well as the rebuttal argument.
3. Public Hearing to Consider Placing a Special Library Services Tax on the November 8, 2022, ITEM 2.1 ATTACHMENT 1 ITEM 2.1 ATTACHMENT 1
21 4
General Election Ballot
Assistant Town Manager Kenton presented a staff report. The current Parcel Tax expires in June, 2024. She answered questions from the Council regarding an opt-out provision for seniors or low-income residents; if the Friends of the Library would be interested in writing the “arguments in favor”.
Mayor Fineman opened the meeting to public comments.
There were no comments.
Mayor Fineman closed the meeting to public comments.
Councilmember Burke supports this proposal and was confident that residents support it. This is a continuation and not an increase of the tax.
Vice Mayor Burdo agreed.
Councilmember Greene volunteered to serve on the subcommittee.
Mayor Fineman stated she would prefer that the Friends of the Library help draft the “arguments in favor” with the Council serving as the signatories. Mayor Fineman stated she, along with Councilmember Greene, would collaborate with the Friends of the Library.
M/s, Burdo/Greene, Motion to adopt the resolution.
AYES: Burdo, Burke, Greene, Mayor Fineman
ABSENT: Colbert
M/s, Burdo/Burke, Motion to adjourn the meeting at 8:08 p.m.
Respectfully submitted,
Toni DeFrancis,
Recording Secretary
ITEM 2.1 ATTACHMENT 1 ITEM 2.1 ATTACHMENT 1
22 Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 2.2.
FROM:
Jeff Zuba, Finance & Administrative Services Director
SUBJECT:
Report of Warrants Issued, July 2022
RECOMMENDATION
That Council acknowledge and file warrant numbers 94412 to 94581 issued during the month of July 2022 and bank draft numbers DFT03706 and DFT03725 in a total amount of $3,433,265.19.
BACKGROUND
This report is an itemization of payments made to vendors during the month just ended. It also includes wires to Bank of America for July 2022 payrolls, including payments for retirement and health benefits. The Bank of America account is used for payroll related items.
The following warrants were voided or cancelled: 94438, 94446-94452, 94457, 94511, and 94514.
Attachment I - Check Report_July 2022
Town of San Anselmo Page 1 of 1 Printed on 8/18/2022
powered by Legistar™ 23
8/16/2022 8:19:10 PM Page 1 of 29
Check Report
Town of San Anselmo By Check Number
Date Range: 07/01/2022 - 07/31/2022
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Bank Code: AP-AP - OPERATING POOL
01102 Central Marin Police Authority 07/01/2022 Regular 0.00 1,234,532.25 94412 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007904 Invoice 07/01/2022 07.01.2022 POLICE SERVICES - JULY - SEPT 2… 0.00 1,234,532.25
01.30.61199 POLICE SERVICES CONTRA… 07.01.2022 POLICE SERVICES - JUL… 1,234,532.25 02411 23 ELEPHANTS THEATRE COMPANY 07/07/2022 Regular 0.00 6,532.40 94413 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007907 Invoice 06/30/2022 07.05.2022 - ISLAND VIBES MINI CAMP - FY2… 0.00 6,532.40
21.63.61186 SPECIALTY CAMPS SERVICES 07.05.2022 - ISLAND VIBES MINI … 6,532.40 02411 23 ELEPHANTS THEATRE COMPANY 07/07/2022 Regular 0.00 -6,532.40 94413 00408 Astro Jump of Northbay 07/07/2022 Regular 0.00 538.00 94414 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 10513541 Invoice 07/07/2022 06.27.2022 - JUMPY FOR CAMP KIDMARIN -… 0.00 269.00
21.63.61179 PARKSIDE SERVICES 06.27.2022 - JUMPY FOR CAMP KI… 134.50
21.63.61184 CAMP KIDMARIN MIGHTY … 06.27.2022 - JUMPY FOR CAMP KI… 134.50 10513579 Invoice 07/07/2022 06.27.2022 - JUMPY - CAMP KIDMARIN - WE… 0.00 269.00
21.63.61179 PARKSIDE SERVICES 06.27.2022 - JUMPY - CAMP KID… 134.50
21.63.61184 CAMP KIDMARIN MIGHTY … 06.27.2022 - JUMPY - CAMP KID… 134.50 00001 AT&T Calnet 07/07/2022 Regular 0.00 271.88 94415
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 000018388235 Invoice 06/25/2022 586 - RECREATION DEPT FAX - 05.25.22 - 06.… 0.00 229.50
21.65.61705 UTILITIES-TELEPHONE 586 - RECREATION DEPT FAX - 05.… 229.50 000018394544 Invoice 06/28/2022 576 - TH CHAMBERS PHONE - 05.27.2022 - 0… 0.00 42.38
01.11.61705 UTILITIES-TELEPHONE 576 - TH CHAMBERS PHONE - 05.… 42.38 03209 Chrisp Company 07/07/2022 Regular 0.00 10,660.50 94416 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007911 Invoice 06/30/2022 5.1.22-6.30-22 SCHOOL BIKE SPINE PROJECT 0.00 10,660.50
14.41.63101 CAPITAL OUTLAY - PAVING… 5.1.22-6.30-22 SCHOOL BIKE SPINE… 9,437.74
19.41.63101 CAPITAL OUTLAY - PAVING… 5.1.22-6.30-22 SCHOOL BIKE SPINE… 1,222.76 00072 Comcast 07/07/2022 Regular 0.00 48.81 94417
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 049-06222022 Invoice 07/07/2022 049 - TOWN HALL CABLE - 06.27.2022 - 07.2… 0.00 48.81
01.41.61706 UTILITIES-ONLINE INTERNET 049 - TOWN HALL CABLE - 06.27.2… 48.81 03159 Cool The Earth 07/07/2022 Regular 0.00 2,247.00 94418 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 172 Invoice 06/28/2022 06.28.2022 - DRIVE CLEAN MARIN CAMPAIG… 0.00 2,247.00
01.41.61150 OUTSIDE SERVICES-OTHER 06.28.2022 - DRIVE CLEAN MARIN… 2,247.00 03280 Eric Brandt 07/07/2022 Regular 0.00 630.56 94419
ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
24 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 2 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount R13619 Invoice 06/29/2022 06.29.2022 - 41 FLORENCE AVE - ROAD BON… 0.00 630.56
01.00.20302 BUILDING: STATE SEISMIC … 06.29.2022 - 41 FLORENCE AVE - … 0.01
01.00.20310 BUILDING: STATE GREEN B… 06.29.2022 - 41 FLORENCE AVE - … 1.00
01.00.42001 BUSINESS LICENSE TAX 06.29.2022 - 41 FLORENCE AVE - … 0.05
01.00.42202 CONSTR: BUILDING PERMIT 06.29.2022 - 41 FLORENCE AVE - … 628.00
19.00.48004 ROAD IMPACT FEE: CONST… 06.29.2022 - 41 FLORENCE AVE - … 1.50 00017 Fairfax Building Supply Co. Inc. 07/07/2022 Regular 0.00 95.90 94420 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 248743 Invoice 06/27/2022 06.27.2022 - MISC TOOLS - CORPYARD 0.00 41.18
01.81.62200 DEPARTMENTAL SUPPLIES 06.27.2022 - MISC TOOLS - CORP… 41.18 248913 Invoice 07/07/2022 06.30.2022 - WALK ON BARK - CORPYARD 0.00 54.72
01.81.62200 DEPARTMENTAL SUPPLIES 06.30.2022 - WALK ON BARK - CO… 54.72 02278 Gardeners' Guild 07/07/2022 Regular 0.00 1,017.00 94421 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 109033 Invoice 07/07/2022 07.01.2022 - SFD - 2 MEDIANS 0.00 1,017.00
01.42.61150 OUTSIDE SERVICES-OTHER 07.01.2022 - SFD - 2 MEDIANS 1,017.00 00021 Good & Clean Company Inc 07/07/2022 Regular 0.00 5,375.00 94422 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 63708 Invoice 06/30/2022 06.30.2022 ADDITIONAL CLEANING - ON THE… 0.00 1,700.00
60.14.62200 DEPARTMENTAL SUPPLIES 06.30.2022 ADDITIONAL CLEANIN… 1,700.00 63710 Invoice 06/30/2022 06.30.2022 - JANITORIAL COVID - REC, ICC, T… 0.00 3,675.00
45.21.61100 OUTSIDE SERVICES 06.30.2022 - JANITORIAL COVID - … 3,675.00 00021 Good & Clean Company Inc 07/07/2022 Regular 0.00 7,675.00 94423 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 63711 Invoice 06/30/2022 06.30.2022 - JANITORIAL SERVICE - REC,ICC,… 0.00 7,675.00
01.12.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 358.39
01.12.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 725.00
01.18.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 143.36
01.41.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 523.25
01.71.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 300.00
01.71.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 1,075.00
01.81.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 240.00
01.81.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 600.00
31.41.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 1,275.00
31.41.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 1,125.00
34.41.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 950.00
34.41.61501 BLDG. MAINT-JANITORIAL 06.30.2022 - JANITORIAL SERVICE -… 360.00 00020 Hannibal's Inc Electrical Construction 07/07/2022 Regular 0.00 614.25 94424 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 24789 Invoice 06/30/2022 06.28.2022 - ELECTRICIAN'S LABOR & MATER… 0.00 614.25
31.41.61506 BLDG. MAINT-OTHER 06.28.2022 - ELECTRICIAN'S LABO… 614.25 02586 HdL Software LLC 07/07/2022 Regular 0.00 2,701.93 94425 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount SIN018931 Invoice 06/30/2022 05.31.2022 - NEW ACCOUNTS PROCESSED - … 0.00 2,701.93
01.12.61150 OUTSIDE SERVICES-OTHER 05.31.2022 - NEW ACCOUNTS PR… 2,701.93 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
25 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 3 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number 03281 Jaime E. Valle 07/07/2022 Regular 0.00 6,160.00 94426 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 070122 Invoice 06/30/2022 07.02.2022 - PLAN CHECKING & INSPECTION… 0.00 6,160.00
01.41.61157 PLAN CHECKING 07.02.2022 - PLAN CHECKING & I… 1,540.00
01.41.61157 PLAN CHECKING 07.02.2022 - PLAN CHECKING & I… 4,620.00 03008 Jara, Inc, 07/07/2022 Regular 0.00 253.15 94427
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007910 Invoice 07/07/2022 07.06.2022 - SWIRL WEEK 4 - 61 CAMPERS - … 0.00 253.15
21.63.61179 PARKSIDE SERVICES 07.06.2022 - SWIRL WEEK 4 - 61 C… 66.40
21.63.61184 CAMP KIDMARIN MIGHTY … 07.06.2022 - SWIRL WEEK 4 - 61 C… 186.75 01280 Kripa N. Davis 07/07/2022 Regular 0.00 2,378.60 94428 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007909 Invoice 06/30/2022 07.05.2022 - CARPENTRY FOR KIDS - SUMM… 0.00 2,378.60
21.63.61186 SPECIALTY CAMPS SERVICES 07.05.2022 - CARPENTRY FOR KIDS… 2,378.60 00145 Marin County Tax Collector 07/07/2022 Regular 0.00 1,942.89 94429 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 21-1119436 Invoice 06/22/2022 06.22.2022 - POSSESSORY TAX - DOVE TAIL … 0.00 336.75
34.41.62924 POSSESSORY TAX PAYMENT 06.22.2022 - POSSESSORY TAX - D… 336.75 21-1119437 Invoice 06/22/2022 06.22.2022 - POSSESSORY TAX - MOMENT R… 0.00 1,120.44
34.41.62924 POSSESSORY TAX PAYMENT 06.22.2022 - POSSESSORY TAX - … 1,120.44 21-1119438 Invoice 06/22/2022 06.22.2022 - POSSESSORY TAX - SOCIAL REP … 0.00 485.70
34.41.62924 POSSESSORY TAX PAYMENT 06.22.2022 - POSSESSORY TAX - S… 485.70 00330 Marin General Services Authority 07/07/2022 Regular 0.00 99,848.00 94430 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007906 Invoice 07/07/2022 06.06.2022 - MEMBER CONTRIBUTIONS - FY… 0.00 99,848.00
01.21.61116 OUTSIDE SVCS-ANIMAL CO… 06.06.2022 - MEMBER CONTRIBUT… 99,848.00 00029 Marin IT 07/07/2022 Regular 0.00 6,442.00 94431
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2022-118298 Invoice 06/27/2022 06.27.2022 - NETWORK MAINTENANCE - JU… 0.00 962.00
01.12.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 192.40
01.18.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 76.96
01.41.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 269.36
01.42.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 86.58
01.71.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 125.06
21.65.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 211.64 2022-118299 Invoice 06/27/2022 06.27.2022 - NETWORK MAINTENANCE - JU… 0.00 5,480.00
01.12.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 1,096.00
01.18.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 438.40
01.41.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 1,534.40
01.42.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 493.20
01.71.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 712.40
21.65.61106 OUTSIDE SVCS-MGT INFO S… NETWORK MAINTENANCE 1,205.60 00431 Massa Construction Co Inc 07/07/2022 Regular 0.00 128,725.41 94432 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount NO. 1.0 - FIREHOU…Invoice 05/18/2022 05.18.2022 - FIREHOUSE - 20 REPAIRS & MO… 0.00 14,016.61
01.32.61150 OUTSIDE SERVICES-OTHER 05.18.2022 - FIREHOUSE - 20 REPA… 14,016.61 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
26 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 4 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number NO. 1.0 MEMORAI…Invoice 05/18/2022 05.18.2022 - MEMORIAL PARK - RAILING INS… 0.00 12,474.89
01.81.61150 OUTSIDE SERVICES-OTHER 05.18.2022 - MEMORIAL PARK - R… 12,474.89 NO. 1.0 MEMORIA…Invoice 05/23/2022 05.23.2022 - MEMORIAL PARK - PAINTING 0.00 55,456.66
70.81.61150 OUTSIDE SERVICES-OTHER 05.23.2022 - MEMORIAL PARK - P… 55,456.66 NO. 1.0 MEMORIA…Invoice 06/20/2022 06.20.2022 - MEMORIAL PARK - SLIDE CHUTE… 0.00 2,784.40
01.81.61150 OUTSIDE SERVICES-OTHER 06.20.2022 - MEMORIAL PARK - SL… 2,784.40 NO. 1.0 OAK AVE Invoice 06/16/2022 06.16.2022 - OAK AVENUE - GAURDRAIL INS… 0.00 5,557.20
01.42.61150 OUTSIDE SERVICES-OTHER 06.16.2022 - OAK AVENUE - GAU… 5,557.20 NO. 1.0 ROBSON Invoice 05/18/2022 05.18.2022 - ROBSON - HARRINGTON HOUSE… 0.00 38,435.65
34.41.61506 BLDG. MAINT-OTHER 05.18.2022 - ROBSON - HARRING… 38,435.65 02754 MAYACAMAS MOUNTAIN SPRING WATER 07/07/2022 Regular 0.00 175.75 94433 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 66383 Invoice 06/30/2022 06.30.2022 - TOWN HALL - BOTTLED WATER … 0.00 175.75
01.12.62200 DEPARTMENTAL SUPPLIES 06.30.2022 - TOWN HALL - BOTTL… 43.93
01.18.62200 DEPARTMENTAL SUPPLIES 06.30.2022 - TOWN HALL - BOTTL… 43.94
01.41.62200 DEPARTMENTAL SUPPLIES 06.30.2022 - TOWN HALL - BOTTL… 43.94
01.71.62200 DEPARTMENTAL SUPPLIES 06.30.2022 - TOWN HALL - BOTTL… 43.94 00332 MERA 07/07/2022 Regular 0.00 14,014.00 94434
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 30-2022-742 Invoice 07/07/2022 07.01.2022 - AGENCY CONTRIBUTION - ANN… 0.00 14,014.00
01.21.61113 OUTSIDE SRVS-MERA ADM… 07.01.2022 - AGENCY CONTRIBUT… 14,014.00 01388 NCSI 07/07/2022 Regular 0.00 370.00 94435
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 23390 Invoice 06/30/2022 07.01.2022 - RECREATION DEPT - BACKGRO… 0.00 370.00
21.65.61137 FINGERPRINTING 07.01.2022 - RECREATION DEPT - … 370.00 03211 ODP Business Solutions LLC 07/07/2022 Regular 0.00 126.45 94436 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 252510790001 Invoice 06/30/2022 06.30.2022 - ADMIN - OFFICE SUPPLIES 0.00 126.45
01.12.62000 OFFICE SUPPLIES 06.30.2022 - ADMIN - OFFICE SUP… 126.45 00128 Pacific Gas & Electric 07/07/2022 Regular 0.00 13,263.81 94437 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
27 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 5 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 461-06222022 Invoice 06/22/2022 461 - TOWN HALL UTILITIES - 05.06.22 - 06.0… 0.00 13,263.81
01.12.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 511.98
01.12.61702 UTILITIES-GAS 461 - TOWN HALL UTILITIES - 05.0… 41.12
01.18.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 328.94
01.18.61702 UTILITIES-GAS 461 - TOWN HALL UTILITIES - 05.0… 26.53
01.30.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 2,480.33
01.30.61702 UTILITIES-GAS 461 - TOWN HALL UTILITIES - 05.0… 197.63
01.41.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 328.94
01.41.61702 UTILITIES-GAS 461 - TOWN HALL UTILITIES - 05.0… 26.53
01.42.61707 UTILITIES-SIGNALS 461 - TOWN HALL UTILITIES - 05.0… 879.39
01.42.61708 UTILITIES-STREET LIGHTS 461 - TOWN HALL UTILITIES - 05.0… 3,814.67
01.71.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 872.76
01.71.61702 UTILITIES-GAS 461 - TOWN HALL UTILITIES - 05.0… 106.11
01.81.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 420.46
21.65.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 399.24
21.65.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 620.75
31.41.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 1,102.22
31.41.61702 UTILITIES-GAS 461 - TOWN HALL UTILITIES - 05.0… 697.68
34.41.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITIES - 05.0… 249.36
34.41.61702 UTILITIES-GAS 461 - TOWN HALL UTILITIES - 05.0… 159.17 **Void** 07/07/2022 Regular 0.00 0.00 94438
00339 Redwood Security Systems 07/07/2022 Regular 0.00 825.00 94439 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 4106041 Invoice 07/07/2022 07.01.2022 - FIRE ALARM MONITORING - JU… 0.00 825.00
01.12.61506 BLDG. MAINT-OTHER 07.01.2022 - FIRE ALARM MONIT… 70.00
01.41.61506 BLDG. MAINT-OTHER 07.01.2022 - FIRE ALARM MONIT… 70.00
01.71.61506 BLDG. MAINT-OTHER 07.01.2022 - FIRE ALARM MONIT… 405.00
01.81.61506 BLDG. MAINT-OTHER 07.01.2022 - FIRE ALARM MONIT… 70.00
34.41.61506 BLDG. MAINT-OTHER 07.01.2022 - FIRE ALARM MONIT… 210.00 00184 Safeway Inc 07/07/2022 Regular 0.00 172.77 94440
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007908 Invoice 06/28/2022 06.28.2022 - PARKSIDE COOKING PROJECT - … 0.00 172.77
21.63.62979 PARKSIDE SUPPLIES 06.28.2022 - PARKSIDE COOKING … 172.77 02936 SMITH'S PEST MANAGEMENT 07/07/2022 Regular 0.00 465.00 94441 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 144372 Invoice 06/30/2022 07.01.2022 - PEST TRAPPING - MEMORIAL P… 0.00 82.50
01.81.61104 OUTSIDE SERVICES-GROU… 07.01.2022 - PEST TRAPPING - M… 82.50 145834 Invoice 06/30/2022 07.01.2022 - PEST TRAPPING - MEMORIAL P… 0.00 82.50
01.81.61104 OUTSIDE SERVICES-GROU… 07.01.2022 - PEST TRAPPING - M… 82.50 59435B Invoice 06/30/2022 07.01.2022 - FLAT MONTHLY FEE - MEMORI… 0.00 300.00
01.81.61104 OUTSIDE SERVICES-GROU… 07.01.2022 - FLAT MONTHLY FEE -… 300.00 00205 Team Ghilotti 07/07/2022 Regular 0.00 32,498.38 94442 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 8299RTN Invoice 06/30/2022 5.21.22-6.29.22 2021 PAVEMENT REHAB PR… 0.00 32,498.38
12.41.63107 CAPITAL OUTLAY - PAVING… 5.21.22-6.29.22 2021 PAVEMENT … 32,498.38 00215 Transbay Lock 07/07/2022 Regular 0.00 28.34 94443 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
28 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 6 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 84831 Invoice 06/27/2022 06.27.2022 - 10 KEYS - DPW 0.00 28.34
01.81.62200 DEPARTMENTAL SUPPLIES 06.27.2022 - 10 KEYS - DPW 28.34 00391 Verizon Wireless 07/07/2022 Regular 0.00 1,162.82 94444 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 9908726596 Invoice 06/12/2022 07.04.2022 - TH WIRELESS - 05.13.2022 - 06.… 0.00 1,162.82
01.12.61705 UTILITIES-TELEPHONE 07.04.2022 - TH WIRELESS - 05.13… 1,068.99
01.12.61705 UTILITIES-TELEPHONE 07.04.2022 - TH WIRELESS - 05.13… -743.49
01.12.61705 UTILITIES-TELEPHONE 07.04.2022 - TH WIRELESS - 05.13… 51.32
01.18.61705 UTILITIES-TELEPHONE 07.04.2022 - TH WIRELESS - 05.13… 38.01
01.41.61705 UTILITIES-TELEPHONE 07.04.2022 - TH WIRELESS - 05.13… 384.01
01.42.61705 UTILITIES-TELEPHONE 07.04.2022 - TH WIRELESS - 05.13… 261.34
21.63.61179 PARKSIDE SERVICES 07.04.2022 - TH WIRELESS - 05.13… 51.32
21.63.61187 ROBSON AFTER SCHOOL S… 07.04.2022 - TH WIRELESS - 05.13… 51.32 00402 US Bank 07/12/2022 Regular 0.00 9,618.75 94445
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007840 Invoice 06/22/2022 05.23.2022 - CLIFFORD - POSTAL SERVICE PL… 0.00 218.42
01.12.62003 POSTAGE 05.23.2022 - CLIFFORD - POSTAL S… 218.42 INV0007841 Invoice 06/22/2022 05.27.2022 - CLIFFORD - TARGET - CARLA'S … 0.00 17.20
01.12.62200 DEPARTMENTAL SUPPLIES 05.27.2022 - CLIFFORD - TARGET -… 17.20 INV0007842 Invoice 06/22/2022 05.31.2022 - CLIFFORD - JOHNNY'S DONUTS -… 0.00 65.65
01.12.62200 DEPARTMENTAL SUPPLIES 05.31.2022 - CLIFFORD - JOHNNY'S… 65.65 INV0007843 Invoice 06/22/2022 06.01.2022 - CLIFFORD - UNITED MARKETS - … 0.00 7.44
01.12.62200 DEPARTMENTAL SUPPLIES 06.01.2022 - CLIFFORD - UNITED … 7.44 INV0007844 Invoice 06/22/2022 06.01.2022 - CLIFFORD - JOHNNY'S DONUTS -… 0.00 8.00
01.12.62200 DEPARTMENTAL SUPPLIES 06.01.2022 - CLIFFORD - JOHNNY'S… 8.00 INV0007845 Invoice 06/22/2022 06.02.2022 - CLIFFORD - COMCAST - CORPY… 0.00 511.15
01.42.61706 UTILITIES-ONLINE INTERNET 06.02.2022 - CLIFFORD - COMCAST… 511.15 INV0007846 Invoice 06/22/2022 06.01.2022 - CLIFFORD - COFFEE ROASTERS -… 0.00 33.63
01.12.62200 DEPARTMENTAL SUPPLIES 06.01.2022 - CLIFFORD - COFFEE … 33.63 INV0007847 Invoice 06/22/2022 04.30.2022 - MAUK - ADOBE - SUBSCRIPTION 0.00 9.99
21.65.61905 PROMOTION/MARKETING 04.30.2022 - MAUK - ADOBE - SU… 9.99 INV0007848 Invoice 06/22/2022 06.06.2022 - MIHAN - CA PARKS & REC SOCI… 0.00 170.00
21.65.61000 TRAINING 06.06.2022 - MIHAN - CA PARKS &… 170.00 INV0007849 Invoice 06/22/2022 06.12.2022 - MIHAN - AMAZON - SOCCER E… 0.00 43.38
21.61.62964 SOCCER SUPPLIES 06.12.2022 - MIHAN - AMAZON - … 43.38 INV0007850 Invoice 06/22/2022 06.12.2022 - MIHAN - AMAZON - SOCCER E… 0.00 81.33
21.61.62964 SOCCER SUPPLIES 06.12.2022 - MIHAN - AMAZON - … 81.33 INV0007851 Invoice 06/22/2022 06.15.2022 - MIHAN - RED HILL CLEANERS - … 0.00 30.90
21.61.62964 SOCCER SUPPLIES 06.15.2022 - MIHAN - RED HILL CL… 30.90 INV0007852 Invoice 06/22/2022 06.15.2022 - MIHAN - ACE HARDWARE - LOCK 0.00 16.35
21.61.62966 TENNIS SUPPLIES 06.15.2022 - MIHAN - ACE HARD… 16.35 INV0007853 Invoice 06/22/2022 06.17.2022 - MIHAN - SURVEY MONKEY - SU… 0.00 99.00
21.65.61302 DUES 06.17.2022 - MIHAN - SURVEY M… 99.00
INV0007854 Invoice 06/22/2022 06.07.2022 - KACMAR - ADOBE - SUBSCRIPT… 0.00 385.83
01.41.61302 DUES 06.07.2022 - KACMAR - ADOBE - … 385.83 INV0007855 Invoice 06/22/2022 06.08.2022 - KACMAR - MARIN IJ - SUBSCRIP… 0.00 13.95
01.12.62000 OFFICE SUPPLIES 06.08.2022 - KACMAR - MARIN IJ -… 13.95 INV0007856 Invoice 06/22/2022 05.25.2022 - O'GRADY - IKEA - CAMP KID M… 0.00 556.40
21.63.62984 CAMP KIDMARIN MIGHTY … 05.25.2022 - O'GRADY - IKEA - CA… 556.40 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
29 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 7 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number INV0007857 Invoice 06/22/2022 05.24.2022 - O'GRADY - SAFEWAY - ROBSON… 0.00 35.42
21.63.62987 ROBSON AFTER SCHOOL S… 05.24.2022 - O'GRADY - SAFEWAY … 35.42 INV0007858 Invoice 06/22/2022 05.25.2022 - O'GRADY - TARGET - ROBSON … 0.00 139.91
21.63.62987 ROBSON AFTER SCHOOL S… 05.25.2022 - O'GRADY - TARGET - … 139.91 INV0007859 Invoice 06/22/2022 05.25.2022 - O'GRADY - TARGET - ROBSON … 0.00 260.39
21.63.62987 ROBSON AFTER SCHOOL S… 05.25.2022 - O'GRADY - TARGET - … 260.39 INV0007860 Invoice 06/22/2022 05.25.2022 - O'GRADY - TARGET - ROBSON … 0.00 61.81
21.63.62987 ROBSON AFTER SCHOOL S… 05.25.2022 - O'GRADY - TARGET - … 61.81 INV0007861 Invoice 06/22/2022 05.25.2022 - O'GRADY - TARGET - CAMP KI… 0.00 10.84
21.63.62984 CAMP KIDMARIN MIGHTY … 05.25.2022 - O'GRADY - TARGET - … 10.84 INV0007862 Invoice 06/22/2022 05.25.2022 - O'GRADY - TARGET - CAMP KI… 0.00 15.18
21.63.62984 CAMP KIDMARIN MIGHTY … 05.25.2022 - O'GRADY - TARGET - … 15.18 INV0007863 Invoice 06/22/2022 05.24.2022 - O'GRADY - HOME DEPOT - CA… 0.00 283.13
21.63.62984 CAMP KIDMARIN MIGHTY … 05.24.2022 - O'GRADY - HOME DE… 283.13 INV0007864 Invoice 06/22/2022 05.25.2022 - O'GRADY - ORIENTAL TRADING -… 0.00 806.87
21.63.62984 CAMP KIDMARIN MIGHTY … 05.25.2022 - O'GRADY - ORIENTAL… 806.87 INV0007865 Invoice 06/22/2022 05.25.2022 - O'GRADY - HOME DEPOT - CA… 0.00 155.30
21.63.62984 CAMP KIDMARIN MIGHTY … 05.25.2022 - O'GRADY - HOME DE… 155.30 INV0007866 Invoice 06/22/2022 05.30.2022 - O'GRADY - COMCAST - ROBSON… 0.00 93.60
21.63.61187 ROBSON AFTER SCHOOL S… 05.30.2022 - O'GRADY - COMCAST… 93.60 INV0007867 Invoice 06/22/2022 05.26.2022 - O'GRADY - ORIENTAL TRADING -… 0.00 32.62
21.63.62984 CAMP KIDMARIN MIGHTY … 05.26.2022 - O'GRADY - ORIENTAL… 32.62 INV0007868 Invoice 06/22/2022 05.31.2022 - O'GRADY - UNITED MARKET - R… 0.00 15.92
21.63.62987 ROBSON AFTER SCHOOL S… 05.31.2022 - O'GRADY - UNITED … 15.92 INV0007869 Invoice 06/22/2022 05.31.2022 - O'GRADY - STEFANOS - ROBSON… 0.00 133.30
21.63.62987 ROBSON AFTER SCHOOL S… 05.31.2022 - O'GRADY - STEFANOS… 133.30 INV0007870 Invoice 06/22/2022 05.31.2022 - O'GRADY - SAFEWAY - ROBSON… 0.00 23.96
21.63.62987 ROBSON AFTER SCHOOL S… 05.31.2022 - O'GRADY - SAFEWAY … 23.96 INV0007871 Invoice 06/22/2022 06.03.2022 - O'GRADY - AMAZON - ROBSON… 0.00 14.08
21.63.62987 ROBSON AFTER SCHOOL S… 06.03.2022 - O'GRADY - AMAZON … 14.08 INV0007872 Invoice 06/22/2022 06.04.2022 - O'GRADY - MPOMC - PROGRAM… 0.00 82.00
21.62.62975 KIDS CULTURE SUPPLIES 06.04.2022 - O'GRADY - MPOMC -… 82.00 INV0007873 Invoice 06/22/2022 06.07.2022 - O'GRADY - AMAZON - CAMP KI… 0.00 222.80
21.63.62984 CAMP KIDMARIN MIGHTY … 06.07.2022 - O'GRADY - AMAZON -… 222.80 INV0007874 Invoice 06/22/2022 06.08.2022 - O'GRADY - ANDRONICS - ROBS… 0.00 42.19
21.63.62987 ROBSON AFTER SCHOOL S… 06.08.2022 - O'GRADY - ANDRONI… 42.19 INV0007875 Invoice 06/22/2022 06.11.2022 - O'GRADY - STEFANOS - CAMP K… 0.00 117.77
21.63.62984 CAMP KIDMARIN MIGHTY … 06.11.2022 - O'GRADY - STEFANOS… 117.77 INV0007876 Invoice 06/22/2022 06.11.2022 - O;GRADY - TARGET/CREDIT - C… 0.00 150.85
21.63.62984 CAMP KIDMARIN MIGHTY … 06.11.2022 - O;GRADY - TARGET/… 498.00
21.63.62987 ROBSON AFTER SCHOOL S… 06.11.2022 - O;GRADY - TARGET/… -347.15 INV0007877 Invoice 06/22/2022 06.11.2022 - O'GRADY - TARGET - CAMP KI… 0.00 45.78
21.63.62984 CAMP KIDMARIN MIGHTY … 06.11.2022 - O'GRADY - TARGET - … 45.78 INV0007878 Invoice 06/22/2022 06.10.2022 - O'GRADY - SMART & FINAL - SU… 0.00 96.61
21.63.62984 CAMP KIDMARIN MIGHTY … 06.10.2022 - O'GRADY - SMART & … 96.61 INV0007879 Invoice 06/22/2022 06.11.2022 - O'GRADY - SAFEWAY - SUPPLIES 0.00 17.97
21.63.62984 CAMP KIDMARIN MIGHTY … 06.11.2022 - O'GRADY - SAFEWAY … 17.97 INV0007880 Invoice 06/22/2022 06.12.2022 - O'GRADY - AMAZON - SUPPLIES 0.00 32.69
21.63.62984 CAMP KIDMARIN MIGHTY … 06.12.2022 - O'GRADY - AMAZON -… 32.69 INV0007881 Invoice 06/22/2022 06.13.2022 - O'GRADY - AMAZON - SUPPLIES 0.00 60.76
21.63.62987 ROBSON AFTER SCHOOL S… 06.13.2022 - O'GRADY - AMAZON -… 60.76 INV0007882 Invoice 06/22/2022 06.14.2022 - O'GRADY - ORIENTAL TRADING … 0.00 272.90 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
30 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 8 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number
21.63.62984 CAMP KIDMARIN MIGHTY … 06.14.2022 - O'GRADY - ORIENTAL… 272.90 INV0007883 Invoice 06/22/2022 06.15.2022 - O'GRADY - SAFEWAY - SUPPLIES 0.00 11.36
21.63.62984 CAMP KIDMARIN MIGHTY … 06.15.2022 - O'GRADY - SAFEWAY … 11.36 INV0007884 Invoice 06/22/2022 06.15.2022 - O'GRADY - SAFEWAY - SUPPLIES 0.00 6.05
21.63.62984 CAMP KIDMARIN MIGHTY … 06.15.2022 - O'GRADY - SAFEWAY … 6.05 INV0007886 Invoice 06/22/2022 06.16.2022 - O'GRADY - SAFEWAY - SUPPLIES 0.00 19.26
21.63.62984 CAMP KIDMARIN MIGHTY … 06.16.2022 - O'GRADY - SAFEWAY … 19.26 INV0007887 Invoice 06/22/2022 06.20.2022 - O'GRADY - AMAZON - ROBSON … 0.00 53.33
21.63.62987 ROBSON AFTER SCHOOL S… 06.20.2022 - O'GRADY - AMAZON -… 53.33 INV0007888 Invoice 06/22/2022 06.17.2022 - O'GRADY - ESIGNS - BANNERS 0.00 363.70
60.14.62903 PICNICS ON PLAZA 06.17.2022 - O'GRADY - ESIGNS - … 363.70 INV0007889 Invoice 06/22/2022 06.20.2022 - O'GRADY - AMAZON - CAMP KI… 0.00 6.49
21.63.62984 CAMP KIDMARIN MIGHTY … 06.20.2022 - O'GRADY - AMAZON -… 6.49 INV0007890 Invoice 06/22/2022 06.21.2022 - O'GRADY - CPRS - MEMBERSHIP 0.00 185.00
21.65.61302 DUES 06.21.2022 - O'GRADY - CPRS - M… 185.00 INV0007891 Invoice 06/22/2022 05.26.2022 - KENTON - AMAZON - LIBRARY … 0.00 71.64
01.71.62000 OFFICE SUPPLIES 05.26.2022 - KENTON - AMAZON -… 71.64 INV0007892 Invoice 06/22/2022 06.13.2022 - KENTON - POTERO MEAD - BO… 0.00 80.00
01.71.62301 ADULT BOOKS 06.13.2022 - KENTON - POTERO … 80.00 INV0007893 Invoice 06/22/2022 05.25.2022 - LEYLAND - SAFEWAY - MEETING… 0.00 48.96
01.71.61000 TRAINING 05.25.2022 - LEYLAND - SAFEWAY … 48.96 INV0007894 Invoice 06/22/2022 06.07.2022 - LEYLAND - FEDEX - LOAN RETU… 0.00 20.25
01.71.61150 OUTSIDE SERVICES-OTHER 06.07.2022 - LEYLAND - FEDEX - L… 20.25 INV0007945 Invoice 06/22/2022 05.29.2022 - LAPTEV - AMAZON - OFFICE SU… 0.00 41.17
01.41.62200 DEPARTMENTAL SUPPLIES 05.29.2022 - LAPTEV - AMAZON - … 41.17 INV0007946 Invoice 06/22/2022 06.10.2022 - LAPTEV - VISTA PRINT - BUSINE… 0.00 54.79
01.18.62200 DEPARTMENTAL SUPPLIES 06.10.2022 - LAPTEV - VISTA PRINT… 54.79 INV0007947 Invoice 06/22/2022 06.25.2022 - WASKEY - ANDRONICOS - MEET… 0.00 4.11
01.71.61132 OUTSIDE SVCS-PROGRAM… 06.25.2022 - WASKEY - ANDRONI… 4.11 INV0007948 Invoice 06/22/2022 06.07.2022 - WASKEY - SCHOLASTIC - BOOKS 0.00 69.35
01.71.61132 OUTSIDE SVCS-PROGRAM… 06.07.2022 - WASKEY - SCHOLAST… 69.35 INV0007949 Invoice 06/22/2022 06.10.2022 - WASKEY - STEFANOS PIZZA - TE… 0.00 29.15
01.71.61132 OUTSIDE SVCS-PROGRAM… 06.10.2022 - WASKEY - STEFANOS… 29.15 INV0007950 Invoice 06/22/2022 06.14.2022 - WASKEY - UNITED MARKET - C… 0.00 17.22
01.71.61132 OUTSIDE SVCS-PROGRAM… 06.14.2022 - WASKEY - UNITED M… 17.22 INV0007951 Invoice 06/22/2022 06.14.2022 - WASKEY - UNITED MARKET - EV… 0.00 37.15
01.71.61132 OUTSIDE SVCS-PROGRAM… 06.14.2022 - WASKEY - UNITED M… 37.15 INV0007952 Invoice 06/22/2022 06.14.2022 - WASKEY - PERRY ART SUPPLIES 0.00 21.65
01.71.61132 OUTSIDE SVCS-PROGRAM… 06.14.2022 - WASKEY - PERRY ART… 21.65 INV0007953 Invoice 06/22/2022 05.23.2022 - JONES - AMAZON - CAMP SUPP… 0.00 8.67
21.63.62979 PARKSIDE SUPPLIES 05.23.2022 - JONES - AMAZON - C… 8.67 INV0007954 Invoice 06/22/2022 06.01.2022 - JONES - TEACHERS PAY TEACHE… 0.00 5.00
21.63.62979 PARKSIDE SUPPLIES 06.01.2022 - JONES - TEACHERS P… 5.00 INV0007955 Invoice 06/22/2022 06.01.2022 - JONES - DISCOUNT SCHOPLL S… 0.00 237.06
21.63.62979 PARKSIDE SUPPLIES 06.01.2022 - JONES - DISCOUNT S… 237.06 INV0007956 Invoice 06/22/2022 06.07.2022 - JONES - AMAZON - CAMP SUPP… 0.00 38.50
21.63.62979 PARKSIDE SUPPLIES 06.07.2022 - JONES - AMAZON - C… 38.50 INV0007957 Invoice 06/22/2022 06.07.2022 - JONES - AMAZON - CAMP SUPP… 0.00 39.88
21.63.62979 PARKSIDE SUPPLIES 06.07.2022 - JONES - AMAZON - C… 39.88 INV0007958 Invoice 06/22/2022 06.07.2022 - JONES - AMAZON - CAMP SUPP… 0.00 113.35
21.63.62979 PARKSIDE SUPPLIES 06.07.2022 - JONES - AMAZON - C… 113.35 INV0007960 Invoice 06/22/2022 06.08.2022 - JONES - AMAZON - CAMP SUPP… 0.00 707.97 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
31 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 9 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number
21.63.62979 PARKSIDE SUPPLIES 06.08.2022 - JONES - AMAZON - C… 707.97 INV0007961 Invoice 06/22/2022 06.08.2022 - JONES - AMAZON - CAMP SUPP… 0.00 35.74
21.63.62979 PARKSIDE SUPPLIES 06.08.2022 - JONES - AMAZON - C… 35.74 INV0007962 Invoice 06/22/2022 06.14.2022 - JONES - AMAZON - CAMP SUPP… 0.00 62.89
21.63.62979 PARKSIDE SUPPLIES 06.14.2022 - JONES - AMAZON - C… 62.89 INV0007963 Invoice 06/22/2022 06.16.2022 - JONES - AMAZON - CAMP SUPP… 0.00 21.78
21.63.62979 PARKSIDE SUPPLIES 06.16.2022 - JONES - AMAZON - C… 21.78 INV0007964 Invoice 06/22/2022 06.16.2022 - JONES - AMAZON - CAMP SUPP… 0.00 35.74
21.63.62979 PARKSIDE SUPPLIES 06.16.2022 - JONES - AMAZON - C… 35.74 INV0007965 Invoice 06/22/2022 06.10.2022 - STEVENSON - ACE - SPRINKLERS 0.00 48.03
01.81.62200 DEPARTMENTAL SUPPLIES 06.10.2022 - STEVENSON - ACE - S… 48.03 INV0007966 Invoice 06/22/2022 06.14.2022 - STEVENSON - ACE - PIPE 0.00 10.90
01.81.62200 DEPARTMENTAL SUPPLIES 06.14.2022 - STEVENSON - ACE - P… 10.90 INV0007967 Invoice 06/22/2022 05.26.2022 - DONERY - AMAZON - SUPPLIES 0.00 51.51
01.12.62200 DEPARTMENTAL SUPPLIES 05.26.2022 - DONERY - AMAZON -… 51.51 INV0007968 Invoice 06/22/2022 06.09.2022 - DONERY - IOTUM 0.00 9.99
01.12.61150 OUTSIDE SERVICES-OTHER 06.09.2022 - DONERY - IOTUM 9.99 INV0007969 Invoice 06/22/2022 05.23.2022 - CONDRY - YOUR ANSWERING S… 0.00 157.97
01.41.61000 TRAINING 05.23.2022 - CONDRY - YOUR AN… 157.97 INV0007970 Invoice 06/22/2022 05.29.2022 - CONDRY - PCBC - TRAINING 0.00 790.00
01.00.20349 SB1186 FEES 70% 05.29.2022 - CONDRY - PCBC - TRA… 790.00 INV0007971 Invoice 06/22/2022 06.02.2022 - CONDRY - REACO - DUES 0.00 60.00
01.41.61103 OUTSIDE SVCS - HUMAN R… 06.02.2022 - CONDRY - REACO - D… 60.00 INV0007972 Invoice 06/22/2022 06.09.2022 - CONDRY - CRAFTSMAN BOOK … 0.00 64.75
01.41.62000 OFFICE SUPPLIES 06.09.2022 - CONDRY - CRAFTSM… 64.75 INV0007973 Invoice 06/22/2022 06.15.2022 - CONDRY - AMERCIAN SANITAT… 0.00 313.88
01.81.61104 OUTSIDE SERVICES-GROU… 06.15.2022 - CONDRY - AMERCIAN… 313.88 INV0007974 Invoice 06/22/2022 06.16.2022 - CONDRY - AMAZON - SUPPLIES 0.00 26.58
01.41.62200 DEPARTMENTAL SUPPLIES 06.16.2022 - CONDRY - AMAZON -… 26.58 INV0007975 Invoice 06/22/2022 06.18.2022 - CONDRY - AMAZON/CREDIT 0.00 22.61
01.41.62200 DEPARTMENTAL SUPPLIES 06.18.2022 - CONDRY - AMAZON -… 174.48
01.42.61150 OUTSIDE SERVICES-OTHER 06.18.2022 - CONDRY - AMAZON -… -30.32
01.42.61150 OUTSIDE SERVICES-OTHER 06.18.2022 - CONDRY - AMAZON -… -38.05
01.42.61150 OUTSIDE SERVICES-OTHER 06.18.2022 - CONDRY - AMAZON -… -83.50 INV0007976 Invoice 06/22/2022 06.18.2022 - CONDRY - UPCODES - FEES 0.00 78.00
01.41.62000 OFFICE SUPPLIES 06.18.2022 - CONDRY - UPCODES -… 78.00 INV0007977 Invoice 06/22/2022 05.31.2022 - O'GRADY - SAFEWAY - SUPPLIES 0.00 21.69
21.63.62987 ROBSON AFTER SCHOOL S… 05.31.2022 - O'GRADY - SAFEWAY … 21.69 INV0007978 Invoice 06/22/2022 06.02.2022 - O'GRADY - AMAZON - SUPPLIES 0.00 22.36
21.63.62987 ROBSON AFTER SCHOOL S… 06.02.2022 - O'GRADY - AMAZON -… 22.36 **Void** 07/12/2022 Regular 0.00 0.00 94446
**Void** 07/12/2022 Regular 0.00 0.00 94447
**Void** 07/12/2022 Regular 0.00 0.00 94448
**Void** 07/12/2022 Regular 0.00 0.00 94449
**Void** 07/12/2022 Regular 0.00 0.00 94450
**Void** 07/12/2022 Regular 0.00 0.00 94451
02411 23 ELEPHANTS THEATRE COMPANY 07/14/2022 Regular 0.00 6,532.40 94452 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007982 Invoice 06/30/2022 06.30.2022 - ISLAND VIBES MINI CAMP - SU… 0.00 6,532.40
21.63.61186 SPECIALTY CAMPS SERVICES 06.30.2022 - ISLAND VIBES MINI … 6,532.40 00048 Alhambra & Sierra Springs 07/14/2022 Regular 0.00 28.94 94453 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
32 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 10 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 12161581070622 Invoice 06/30/2022 06.30.2022 - CORPYARD - BOTTLED WATER … 0.00 28.94
01.42.62200 DEPARTMENTAL SUPPLIES 06.30.2022 - CORPYARD - BOTTLE… 28.94 02806 AQUASCAPE POOL SERVICE 07/14/2022 Regular 0.00 209.00 94454 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 17434 Invoice 06/30/2022 06.30.2022 - IMAGINATION PARK - FOUNTA… 0.00 209.00
14.81.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - IMAGINATION PARK -… 209.00 00054 ASCAP 07/14/2022 Regular 0.00 30.67 94455
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 724-06202022 Invoice 06/30/2022 06.20.2022 - CONTRACT RATE SCHEDULE - E… 0.00 30.67
60.14.61901 ASCAP ROYALTIES - EVENTS 06.20.2022 - CONTRACT RATE SC… 30.67 00388 Baker & Taylor 07/14/2022 Regular 0.00 1,149.09 94456 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 5017759309 Invoice 06/30/2022 06.09.2022 - LIBRARY - ADULT BOOKS 0.00 20.50
01.71.62301 ADULT BOOKS 06.09.2022 - LIBRARY - ADULT BO… 20.50 5017764933 Invoice 06/30/2022 06.13.2022 - LIBRARY - ADULT BOOKS 0.00 20.24
01.71.62301 ADULT BOOKS 06.13.2022 - LIBRARY - ADULT BO… 20.24 5017764934 Invoice 06/30/2022 06.13.2022 - LIBRARY - ADULT BOOKS 0.00 39.83
01.71.62301 ADULT BOOKS 06.13.2022 - LIBRARY - ADULT BO… 39.83 5017764935 Invoice 06/30/2022 06.13.2022 - LIBRARY - ADULT BOOKS 0.00 12.23
01.71.62301 ADULT BOOKS 06.13.2022 - LIBRARY - ADULT BO… 12.23 5017764936 Invoice 06/30/2022 06.13.2022 - LIBRARY - ADULT BOOKS 0.00 43.71
01.71.62301 ADULT BOOKS 06.13.2022 - LIBRARY - ADULT BO… 43.71 5017764937 Invoice 06/30/2022 06.13.2022 - LIBRARY - ADULT BOOKS 0.00 280.36
01.71.62301 ADULT BOOKS 06.13.2022 - LIBRARY - ADULT BO… 280.36 5017764938 Invoice 06/30/2022 06.13.2022 - LIBRARY - ADULT BOOKS 0.00 22.82
01.71.62301 ADULT BOOKS 06.13.2022 - LIBRARY - ADULT BO… 22.82 5017781851 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 41.13
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 41.13 5017781852 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 119.46
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 119.46 5017781853 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 12.90
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 12.90 5017781854 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 20.23
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 20.23 5017781855 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 37.05
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 37.05 5017781856 Invoice 06/30/2022 06.21.2022 - LIBRARY -ADULT BOOKS 0.00 35.07
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY -ADULT BO… 35.07 5017781857 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 27.03
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 27.03 5017781858 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 68.99
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 68.99 5017781859 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 23.69
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 23.69 5017781860 Invoice 06/30/2022 06.21.2022 - LIBRARY - ADULT BOOKS 0.00 20.24
01.71.62301 ADULT BOOKS 06.21.2022 - LIBRARY - ADULT BO… 20.24 5017798317 Invoice 06/30/2022 06.15.2022 - LIBRARY - CHILDRENS BOOKS 0.00 13.78 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
33 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 11 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number
01.71.62302 CHILDRENS BOOKS 06.15.2022 - LIBRARY - CHILDRENS… 13.78 5017800450 Invoice 06/30/2022 06.15.2022 - LIBRARY - CHILDRENS BOOKS 0.00 15.06
01.71.62302 CHILDRENS BOOKS 06.15.2022 - LIBRARY - CHILDRENS… 15.06 5017800451 Invoice 06/30/2022 06.15.2022 - LIBRARY - CHILDRENS BOOKS 0.00 12.46
01.71.62302 CHILDRENS BOOKS 06.15.2022 - LIBRARY - CHILDRENS… 12.46 5017813008 Invoice 06/30/2022 06.28.2022 - LIBRARY - ADULT BOOKS 0.00 20.87
01.71.62301 ADULT BOOKS 06.28.2022 - LIBRARY - ADULT BO… 20.87 5017813009 Invoice 06/30/2022 06.28.2022 - LIBRARY - ADULT BOOKS 0.00 64.31
01.71.62301 ADULT BOOKS 06.28.2022 - LIBRARY - ADULT BO… 64.31 5017813010 Invoice 06/30/2022 06.28.2022 - LIBRARY - ADULT BOOKS 0.00 75.90
01.71.62301 ADULT BOOKS 06.28.2022 - LIBRARY - ADULT BO… 75.90 H61605100 Invoice 06/30/2022 06.14.2022 - LIBRARY - VIDEOS 0.00 46.98
01.71.62307 VIDEOS 06.14.2022 - LIBRARY - VIDEOS 46.98
H61710460 Invoice 06/30/2022 06.22.2022 - LIBRARY - VIDEOS 0.00 27.13
01.71.62307 VIDEOS 06.22.2022 - LIBRARY - VIDEOS 27.13
H61781660 Invoice 06/30/2022 06.29.2022 - LIBRARY - VIDEOS 0.00 27.12
01.71.62307 VIDEOS 06.29.2022 - LIBRARY - VIDEOS 27.12
**Void** 07/14/2022 Regular 0.00 0.00 94457
00429 California Infrastructure Consultancy, Inc. 07/14/2022 Regular 0.00 5,276.25 94458 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 20027.102 Invoice 06/30/2022 06.23.2022 - PROJECT ENGINEER - 13HRS 0.00 5,276.25
12.41.63119 CAPITAL OUTLAY - BRIDGE … 06.09.2022 - PROJECT ENGINEER -… 605.19
14.41.63119 CAPTIAL OUTLAY - BRIDGE … 06.23.2022 - PROJECT ENGINEER -… 4,671.06 01563 Contract Sweeping Services 07/14/2022 Regular 0.00 5,846.21 94459 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 22000622 Invoice 06/30/2022 06.15.2022 - RESIDENTIAL STREET SWEEPING… 0.00 5,846.21
01.42.61135 STREET SWEEPING 06.15.2022 - RESIDENTIAL STREET… 5,846.21 02581 CSG Consultants 07/14/2022 Regular 0.00 18,968.75 94460 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount B221225 Invoice 06/30/2022 06.30.2022 - BUILDING PLAN REVIEW SERVI… 0.00 18,968.75
01.41.61157 PLAN CHECKING 06.30.2022 - BUILDING PLAN REVI… 18,968.75 01320 DC Electric Group Inc 07/14/2022 Regular 0.00 8,465.76 94461 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 440278 Invoice 06/30/2022 06.30.2022 - TRAFFIC SIGNAL PREVENTITIVE -… 0.00 7,526.16
01.42.61130 OUTSIDE SVCS-SIGNALS 06.30.2022 - TRAFFIC SIGNAL PRE… 7,526.16 440290 Invoice 06/30/2022 06.30.2022 - STREETLIGHT ROUTINE MAINT… 0.00 613.27
01.42.61131 OUTSIDE SVCS-STREET LIG… 06.30.2022 - STREETLIGHT ROUTI… 613.27 440318 Invoice 06/30/2022 06.30.2022 - STREETLIGHT MAINTENANCE - … 0.00 326.33
01.42.61131 OUTSIDE SVCS-STREET LIG… 06.30.2022 - STREETLIGHT MAINT… 326.33 02622 Epstein Holtzapple Christo LLP 07/14/2022 Regular 0.00 26,775.00 94462 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 6163 Invoice 06/30/2022 06.30.2022 - LEGAL COUNCIL - JUNE 2022 0.00 20,750.00
01.16.61138 GENERAL COUNSEL LEGAL … 06.30.2022 - LEGAL COUNCIL - JU… 20,750.00 6164 Invoice 06/30/2022 06.30.2022 - LEGAL COUNCIL - PLANNING C… 0.00 3,050.00
01.16.61138 GENERAL COUNSEL LEGAL … 06.30.2022 - LEGAL COUNCIL - PL… 3,050.00 6165 Invoice 06/30/2022 06.30.2022 - LEGAL COUNCIL - SETTLEMENT … 0.00 2,975.00 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
34 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 12 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number
01.16.61138 GENERAL COUNSEL LEGAL … 06.30.2022 - LEGAL COUNCIL - SE… 2,975.00 02236 HooplaDigital 07/14/2022 Regular 0.00 663.86 94463 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 502333260 Invoice 06/30/2022 06.30.2022 - LIBRARY - DIGITAL AUDIO BOO… 0.00 663.86
27.71.62309 E BOOKS 06.30.2022 - LIBRARY - DIGITAL A… 663.86 02558 Kanopy 07/14/2022 Regular 0.00 637.00 94464
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 304231-PPU Invoice 06/30/2022 06.30.2022 - LIBRARY- CHILDRENS VIDEOS 0.00 637.00
27.71.62307 VIDEOS 06.30.2022 - LIBRARY- CHILDRENS… 637.00 00377 Luis Quezada 07/14/2022 Regular 0.00 25,252.50 94465 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007995 Invoice 06/30/2022 06.30.2022 - SUMMER CAMPS - 1ST PAYME… 0.00 25,252.50
21.63.61183 CAMP SPORTS SERVICES 06.30.2022 - SUMMER CAMPS - 1… 25,252.50 00029 Marin IT 07/14/2022 Regular 0.00 27,720.34 94466
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2022-118358 Invoice 06/30/2022 06.30.2022 - TH NETWORK MAINTENANCE - … 0.00 400.00
01.12.61106 OUTSIDE SVCS-MGT INFO S… 06.30.2022 - TH NETWORK MAIN… 80.00
01.18.61106 OUTSIDE SVCS-MGT INFO S… 06.30.2022 - TH NETWORK MAIN… 32.00
01.41.61106 OUTSIDE SVCS-MGT INFO S… 06.30.2022 - TH NETWORK MAIN… 112.00
01.42.61106 OUTSIDE SVCS-MGT INFO S… 06.30.2022 - TH NETWORK MAIN… 36.00
01.71.61106 OUTSIDE SVCS-MGT INFO S… 06.30.2022 - TH NETWORK MAIN… 52.00
21.65.61106 OUTSIDE SVCS-MGT INFO S… 06.30.2022 - TH NETWORK MAIN… 88.00 2022-23560 Invoice 06/30/2022 06.27.2022 - VIDEO CONFERENCE SYSTM - I… 0.00 27,320.34
42.21.63003 COMPUTER HARDWARE/S… 06.27.2022 - VIDEO CONFERENCE … 27,320.34 03228 MGE Engineering Inc 07/14/2022 Regular 0.00 9,920.00 94467 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 661.02 Invoice 06/30/2022 06.23.2022 - PROJECT ENGINEER - 29 HRS 0.00 9,280.00
71.81.61150 OUTSIDE SERVICES-OTHER 06.23.2022 - PROJECT ENGINEER -… 9,280.00 663.02 Invoice 06/30/2022 06.23.2022 - PROJECT ENGINEERING SERVIC… 0.00 640.00
14.41.63119 CAPTIAL OUTLAY - BRIDGE … 06.23.2022 - PROJECT ENGINEERI… 640.00 01627 MULTIFORCE SYSTEMS CORP 07/14/2022 Regular 0.00 1,725.00 94468 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 921688 Invoice 06/30/2022 03.31.2022 - ANNUAL SUPPORT NETWORK 0.00 1,725.00
01.42.62988 VEHICLE-FUEL/OIL/TIRES 03.31.2022 - ANNUAL SUPPORT N… 1,725.00 00397 NorthNetLibrary System 07/14/2022 Regular 0.00 578.00 94469 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2090 Invoice 06/30/2022 06.30.2022 - NLS MEMBERSHIP FEES - FY22-… 0.00 578.00
01.71.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - NLS MEMBERSHIP FE… 578.00 03211 ODP Business Solutions LLC 07/14/2022 Regular 0.00 170.19 94470 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 247128514001 Invoice 06/30/2022 05.25.2022 - OFFICE SUPPIES - LIBRARY 0.00 105.13
01.71.62000 OFFICE SUPPLIES 05.25.2022 - OFFICE SUPPIES - LIB… 105.13 252035548001 Invoice 06/30/2022 06.29.2022 - OFFICE SUPPLIES - LIBRARY 0.00 65.06 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
35 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 13 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number
01.71.62200 DEPARTMENTAL SUPPLIES 06.29.2022 - OFFICE SUPPLIES - LI… 65.06 00992 OverDrive Inc. 07/14/2022 Regular 0.00 3,999.80 94471 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 02883CO22205474 Invoice 06/30/2022 06.28.2022 - LIBRARY - AUDIO BOOKS 0.00 3,999.80
27.71.62309 E BOOKS 06.28.2022 - LIBRARY - AUDIO BO… 3,999.80 03285 Rivas Concrete 07/14/2022 Regular 0.00 3,000.00 94472 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 1016-400 Invoice 06/30/2022 06.30.2022 - CONCRETE WORK - SIDEWALKS 0.00 3,000.00
01.00.20304 CONCRETE CONTRACT 06.30.2022 - CONCRETE WORK - S… 3,000.00 00181 Ross Valley Fire Department 07/14/2022 Regular 0.00 10,053.59 94473 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 063022SAQ4 Invoice 06/30/2022 06.30.2022 - EMERGENCY PREPAREDNESS - … 0.00 10,053.59
35.41.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - EMERGENCY PREPAR… 10,053.59 03200 TBWBH Props & Measures 07/14/2022 Regular 0.00 6,500.00 94474 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV03988 Invoice 06/30/2022 06.30.2022 - CONSULTING FEE - JUNE 2022 0.00 6,500.00
01.12.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - CONSULTING FEE - J… 6,500.00 00211 Tim Musselman 07/14/2022 Regular 0.00 900.00 94475 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007994 Invoice 06/30/2022 06.30.2022 - BAMBINO BASEBALL - SPRING … 0.00 900.00
21.61.61160 BASEBALL EXPENSES 06.30.2022 - BAMBINO BASEBALL … 900.00 03207 Toni DeFrancis 07/14/2022 Regular 0.00 280.00 94476 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007993 Invoice 06/30/2022 06.28.2022 - TRANSCRIPTION - TOWN COUN… 0.00 280.00
01.12.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - TRANSCRIPTION - T… 280.00 02411 23 ELEPHANTS THEATRE COMPANY 07/14/2022 Regular 0.00 2,937.20 94477 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007987 Invoice 07/14/2022 07.12.2022 - BRAODWAY BABIES MINI CAM… 0.00 2,937.20
21.63.61186 SPECIALTY CAMPS SERVICES 07.12.2022 - BRAODWAY BABIES … 2,937.20 00007 Bay Cities Joint Power Insurance Authority 07/14/2022 Regular 0.00 536,973.00 94478 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount BCJPIA-2023-0019 Invoice 07/14/2022 07.05.2022 - ANNUAL DEPOSIT CONTRIBUTI… 0.00 536,973.00
40.21.60201 WORKERS COMPENSATION… 07.05.2022 - ANNUAL DEPOSIT C… 156,504.00
40.21.61153 LIABILITY INSURANCE PRE… 07.05.2022 - ANNUAL DEPOSIT C… 284,113.00
40.21.61153 LIABILITY INSURANCE PRE… 07.05.2022 - ANNUAL DEPOSIT C… 75,757.00
40.21.61153 LIABILITY INSURANCE PRE… 07.05.2022 - ANNUAL DEPOSIT C… 4,227.00
40.21.61153 LIABILITY INSURANCE PRE… 07.05.2022 - ANNUAL DEPOSIT C… 959.00
40.21.61153 LIABILITY INSURANCE PRE… 07.05.2022 - ANNUAL DEPOSIT C… 15,413.00 00061 Bill Jacobson 07/14/2022 Regular 0.00 337.50 94479 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 1577 Invoice 07/14/2022 07.05.2022 - AUDIO ARCHIVE SERVER - UPD… 0.00 337.50
01.12.61106 OUTSIDE SVCS-MGT INFO S… 07.05.2022 - AUDIO ARCHIVE SER… 337.50 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
36 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 14 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number 00308 CivicPlus 07/14/2022 Regular 0.00 11,051.70 94480 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 229557 Invoice 07/14/2022 07.01.2022 - ANNUAL FEE - HOSTING & SUP… 0.00 11,051.70
42.21.63003 COMPUTER HARDWARE/S… 07.01.2022 - ANNUAL FEE - HOSTI… 11,051.70 00410 COFAM 07/14/2022 Regular 0.00 150.00 94481
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007989 Invoice 07/14/2022 07.08.2022 - ART TALK - GO PEI & COUTURE -… 0.00 150.00
01.71.61132 OUTSIDE SVCS-PROGRAM… 07.08.2022 - ART TALK - GO PEI & … 150.00 02732 Diesel Direct West 07/14/2022 Regular 0.00 1,645.06 94482 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 84626493 Invoice 07/14/2022 07.05.2022 - GASOLINE UNL - 270.7 GALLONS 0.00 1,645.06
01.42.62988 VEHICLE-FUEL/OIL/TIRES 07.05.2022 - GASOLINE UNL - 270… 1,645.06 00266 Ed Gurka 07/14/2022 Regular 0.00 372.50 94483
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 29-2022 Invoice 07/14/2022 07.05.2022 - ARBORIST SERVICES - 06.26.- 07… 0.00 372.50
01.42.61105 OUTSIDE SERVICES-TREES 07.05.2022 - ARBORIST SERVICES -… 372.50 02278 Gardeners' Guild 07/14/2022 Regular 0.00 3,930.00 94484 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 109084 Invoice 07/14/2022 07.01.2022 - REDHILL MEDIAN, SAN ANSEL… 0.00 2,015.00
01.42.61150 OUTSIDE SERVICES-OTHER 07.01.2022 - REDHILL MEDIAN, S… 2,015.00 109085 Invoice 07/14/2022 07.01.2022 - IMAGINATION PARK, TH, MAG… 0.00 1,915.00
01.42.61150 OUTSIDE SERVICES-OTHER 07.01.2022 - IMAGINATION PARK,… 1,915.00 03286 Gerald Stahl 07/14/2022 Regular 0.00 3,350.00 94485 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007998 Invoice 07/14/2022 07.11.2022 - REDWOOD PICNIC TABLES - 6 &… 0.00 3,350.00
01.81.61150 OUTSIDE SERVICES-OTHER 07.11.2022 - REDWOOD PICNIC T… 3,350.00 00113 Juan Olsen Sanchez 07/14/2022 Regular 0.00 395.00 94486 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007988 Invoice 07/14/2022 07.12.2022 - GYMNASTICS - CAMP KIDMARI… 0.00 395.00
21.63.61179 PARKSIDE SERVICES 07.12.2022 - GYMNASTICS - CAMP… 125.00
21.63.61184 CAMP KIDMARIN MIGHTY … 07.12.2022 - GYMNASTICS - CAMP… 270.00 01280 Kripa N. Davis 07/14/2022 Regular 0.00 1,730.40 94487 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007992 Invoice 07/14/2022 07.12.2022 - CARPENTRY FOR KIDS CAMP - … 0.00 1,730.40
21.63.61186 SPECIALTY CAMPS SERVICES 07.12.2022 - CARPENTRY FOR KIDS… 1,730.40 03283 Lyle Beiger 07/14/2022 Regular 0.00 250.00 94488
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007985 Invoice 07/14/2022 07.12.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 250.00
60.14.62903 PICNICS ON PLAZA 07.12.2022 - SAN ANSELMO LIVE -… 250.00 00644 MARINet 07/14/2022 Regular 0.00 106,403.78 94489
ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
37 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 15 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007990 Invoice 07/14/2022 07.11.2022 - OPERATING BUDGET PAYMENT 0.00 106,403.78
01.71.61197 AUTOMATED CALTALOG A… 07.11.2022 - OPERATING BUDGET… 84,499.35
27.71.61197 AUTOMATED CALTALOG A… 07.11.2022 - OPERATING BUDGET… 6,064.87
27.71.61197 AUTOMATED CALTALOG A… 07.11.2022 - OPERATING BUDGET… 7,422.89
27.71.61706 CENIC NETWORK SERVICE 07.11.2022 - OPERATING BUDGET… 8,416.67 00515 Mill Valley Refuse Service Inc 07/14/2022 Regular 0.00 1,713.78 94490 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 0003413808 Invoice 07/14/2022 07.01.2022 - POTABLE TOILET/SINK 0.00 1,713.78
45.21.61100 OUTSIDE SERVICES 07.01.2022 - POTABLE TOILET/SINK 1,713.78 00372 Miller Pacific 07/14/2022 Regular 0.00 2,497.70 94491 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 24904 Invoice 07/14/2022 07.07.2022 - GEOTECHNICAL SERVICES - PHA… 0.00 2,497.70
14.41.63101 CAPITAL OUTLAY - PAVING… 07.07.2022 - GEOTECHNICAL SERV… 2,497.70 00032 MSM Inc 07/14/2022 Regular 0.00 2,994.75 94492
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 179200 Invoice 07/14/2022 07.11.2022 - JANATORIAL SUPPLIES - LIBRARY 0.00 248.05
01.71.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 248.05 179201 Invoice 07/14/2022 07.11.2022 - JANATORIAL SUPPLIES - ICC 0.00 563.83
31.41.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 563.83 179203 Invoice 07/14/2022 07.11.2022 - JANATORIAL SUPPLIES - TOWN… 0.00 629.68
01.12.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 209.87
01.18.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 209.87
01.41.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 209.94 179204 Invoice 07/14/2022 07.11.2022 - JANATORIAL SUPPLIES - REC DE… 0.00 473.92
01.82.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 473.92 179205 Invoice 07/14/2022 07.11.2022 - JANATORIAL SUPPLIES - ROBS… 0.00 276.01
34.41.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 276.01 179206 Invoice 07/14/2022 07.11.2022 - JANATORIAL SUPPLIES - PARK 0.00 803.26
01.81.61501 BLDG. MAINT-JANITORIAL 07.11.2022 - JANATORIAL SUPPLIE… 803.26 03282 Paul Holmberg 07/14/2022 Regular 0.00 300.00 94493 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007984 Invoice 07/14/2022 07.12.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 300.00
60.14.62903 PICNICS ON PLAZA 07.12.2022 - SAN ANSELMO LIVE -… 300.00 01848 Real Magic & Co. 07/14/2022 Regular 0.00 325.00 94494 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2002 Invoice 07/14/2022 07.12.2022 - MAGIC SHOW - CAMP KIDMAR… 0.00 325.00
21.63.61179 PARKSIDE SERVICES 07.12.2022 - MAGIC SHOW - CAM… 162.50
21.63.61184 CAMP KIDMARIN MIGHTY … 07.12.2022 - MAGIC SHOW - CAM… 162.50 00652 Stephen Flatland Land Surveying 07/14/2022 Regular 0.00 1,000.00 94495 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007999 Invoice 07/14/2022 07.06.2022 - 45 ROSS AVE - PARCEL MAP & … 0.00 1,000.00
01.41.61150 OUTSIDE SERVICES-OTHER 07.06.2022 - 45 ROSS AVE - PARCE… 1,000.00 03083 Ted William Pelletier 07/14/2022 Regular 0.00 550.00 94496 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
38 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 16 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007986 Invoice 07/14/2022 07.13.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 550.00
60.14.62903 PICNICS ON PLAZA 07.13.2022 - SAN ANSELMO LIVE -… 550.00 03071 TOM FINCH 07/14/2022 Regular 0.00 550.00 94497
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007983 Invoice 07/14/2022 07.12.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 550.00
60.14.62903 PICNICS ON PLAZA 07.12.2022 - SAN ANSELMO LIVE -… 550.00 00470 Transportation Authority of Marin 07/14/2022 Regular 0.00 24,360.00 94498 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007991 Invoice 07/14/2022 07.05.2022 - ANNUAL CMA FEE - 22-23 0.00 24,360.00
01.21.61126 OUTSIDE SVCS-TRAN AUTH… 07.05.2022 - ANNUAL CMA FEE - … 24,360.00 00456 Wesco Graphics Inc 07/14/2022 Regular 0.00 7,030.59 94499 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 50046 Invoice 07/14/2022 07.13.2022 - PRINTING & MAILING - ACTIVIT… 0.00 7,030.59
21.65.62004 PROGRAM BROCHURE & … 07.13.2022 - PRINTING & MAILING… 5,168.87
21.65.62004 PROGRAM BROCHURE & … 07.13.2022 - PRINTING & MAILING… 1,861.72 02931 AIS SPECIALTY PRODUCTS, INC. 07/21/2022 Regular 0.00 917.96 94500 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount PSI453167 Invoice 06/30/2022 06.24.2022 - AIS OFF AEROSOL - 1 DOZ - CO… 0.00 917.96
01.81.62200 DEPARTMENTAL SUPPLIES 06.24.2022 - AIS OFF AEROSOL - 1… 917.96 00001 AT&T Calnet 07/21/2022 Regular 0.00 2,511.25 94501 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 000018452044 Invoice 06/30/2022 574 - ALL DEPTS - CENTREX - 06.10.22 - 07.09… 0.00 1,353.87
01.12.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 270.77
01.18.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 216.62
01.41.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 108.31
01.42.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 176.00
01.71.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 148.93
01.81.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 54.15
21.65.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 311.39
31.41.61705 UTILITIES-TELEPHONE 574 - ALL DEPTS - CENTREX - 06.10… 67.70 000018452048 Invoice 06/30/2022 579 - TRAFFIC LIGHT MODEM - 06.10. - 07.09… 0.00 21.19
01.42.61705 UTILITIES-TELEPHONE 579 - TRAFFIC LIGHT MODEM - 06… 21.19 000018452049 Invoice 06/30/2022 580 - ROBSON HOUSE TELEPHONE - 06.10. - … 0.00 40.98
34.41.61705 UTILITIES-TELEPHONE 580 - ROBSON HOUSE TELEPHONE… 40.98 000018452050 Invoice 06/30/2022 587 - FUEL FORCE STATION - 06.10. - 07.09.2… 0.00 21.19
01.81.61705 UTILITIES-TELEPHONE 587 - FUEL FORCE STATION - 06.10… 21.19 000018465360 Invoice 06/30/2022 588 - LIBRARY ELEVATOR PHONE - 06.12 - 07… 0.00 1,074.02
01.71.61504 BLDG. MAINT-ELEVATOR 588 - LIBRARY ELEVATOR PHONE -… 1,074.02 02823 BOUCHER LAW 07/21/2022 Regular 0.00 35,870.50 94502 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 1131 Invoice 06/30/2022 06.30.2022 - LEGAL COUNCIL - LABOR & EM… 0.00 6,227.50
01.16.61196 PERSONNEL LEGAL SERVIC… 06.30.2022 - LEGAL COUNCIL - LA… 6,227.50 1132 Invoice 06/30/2022 06.30.2022 - LEGAL COUNCIL - PLANNING DI… 0.00 408.00
01.18.61806 MISC HIRING EXPENSES 06.30.2022 - LEGAL COUNCIL - PL… 408.00 1133 Invoice 06/30/2022 06.30.2022 - LEGAL COUNCIL - PUBLIC WOR… 0.00 29,235.00 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
39 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 17 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number
01.41.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - LEGAL COUNCIL - PU… 2,923.50
01.42.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - LEGAL COUNCIL - PU… 23,388.00
01.81.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - LEGAL COUNCIL - PU… 2,923.50 02315 Coastland Civil Engineering Inc. 07/21/2022 Regular 0.00 12,135.00 94503 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 54184 Invoice 06/30/2022 06.30.2022 - BUILDING DEPT SERVICES - FY2… 0.00 12,135.00
01.41.61157 PLAN CHECKING 06.30.2022 - BUILDING DEPT SERV… 12,135.00 00082 Department of Industrial Relations 07/21/2022 Regular 0.00 675.00 94504 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount E1895775SA Invoice 06/30/2022 06.30.2022 - CONVEYANCE REMITTANCE 0.00 225.00
41.41.61506 PUBLIC WORKS CAPITAL O… 06.30.2022 - CONVEYANCE REMIT… 225.00 E-1895781SA Invoice 06/30/2022 06.30.2022 - CONVEYANCE REMITTANCE 0.00 225.00
41.41.61506 PUBLIC WORKS CAPITAL O… 06.30.2022 - CONVEYANCE REMIT… 225.00 E1895782SA Invoice 06/30/2022 06.30.2022 - CONVEYANCE REMITTANCE 0.00 225.00
41.41.61506 PUBLIC WORKS CAPITAL O… 06.30.2022 - CONVEYANCE REMIT… 225.00 00092 Ewing Irrigation Products 07/21/2022 Regular 0.00 174.44 94505 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 17002961 Invoice 06/30/2022 06.09.2022 - RAINBIRD VARIABLE - CORPYA… 0.00 151.33
01.81.62200 DEPARTMENTAL SUPPLIES 06.09.2022 - RAINBIRD VARIABLE -… 151.33 17046173 Invoice 06/30/2022 06.14.2022 - MISC IRRIGATION SUPPLIES - C… 0.00 23.11
01.81.62200 DEPARTMENTAL SUPPLIES 06.14.2022 - MISC IRRIGATION SU… 23.11 00017 Fairfax Building Supply Co. Inc. 07/21/2022 Regular 0.00 70.96 94506 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 249765 Invoice 06/30/2022 06.30.2022 - ORGANIC COMPOST - CORPYA… 0.00 70.96
01.81.62200 DEPARTMENTAL SUPPLIES 06.30.2022 - ORGANIC COMPOST -… 70.96 02444 Ingrid Pellegrini Imaz 07/21/2022 Regular 0.00 300.00 94507 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 0035 Invoice 07/30/2022 07.30.2022 - SPANISH STORYTIME - JUNE 20… 0.00 300.00
01.71.61132 OUTSIDE SVCS-PROGRAM… 07.30.2022 - SPANISH STORYTIME … 300.00 00022 Jackson's Hardware Inc. 07/21/2022 Regular 0.00 180.08 94508 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 108104 Invoice 06/30/2022 06.22.2022 - FLAG SET - MISC SUPPLIES 0.00 161.58
01.81.62200 DEPARTMENTAL SUPPLIES 06.22.2022 - FLAG SET - MISC SUP… 161.58 108105 Invoice 06/30/2022 06.22.2022 - FLAG SET - CORPYARD 0.00 18.50
01.81.62200 DEPARTMENTAL SUPPLIES 06.22.2022 - FLAG SET - CORPYARD 18.50 03289 Kaiser Gardens. Inc. 07/21/2022 Regular 0.00 4,200.00 94509 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 408 Invoice 06/30/2022 06.30.2022 - OAK PARK ROUNDS CLEARING -… 0.00 4,200.00
35.41.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - OAK PARK ROUNDS … 4,200.00 00142 Marin Municipal Water District 07/21/2022 Regular 0.00 7,880.30 94510 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 073-07112022 Invoice 06/30/2022 073 - CENTER BLVD & FORREST AVE - 05.05.-… 0.00 83.29
01.81.61703 UTILITIES-WATER 073 - CENTER BLVD & FORREST A… 83.29 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
40 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 18 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number 119-07142022 Invoice 06/30/2022 119 - MULTIPLE - 05.11.2022 - 07.11.2022 0.00 2,130.84
01.12.61703 UTILITIES-WATER 119 - MULTIPLE - 05.11.2022 - 07.… 255.70
01.18.61703 UTILITIES-WATER 119 - MULTIPLE - 05.11.2022 - 07.… 191.78
01.30.61703 UTILITIES-WATER 119 - MULTIPLE - 05.11.2022 - 07.… 1,385.05
01.41.61703 UTILITIES-WATER 119 - MULTIPLE - 05.11.2022 - 07.… 191.78
01.71.61703 UTILITIES-WATER 119 - MULTIPLE - 05.11.2022 - 07.… 106.53 120-07142022 Invoice 06/30/2022 120 - MULTIPLE - 05.11.2022 - 07.11.2022 0.00 1,345.60
01.81.61703 UTILITIES-WATER 120 - MULTIPLE - 05.11.2022 - 07.… 1,345.60 152-07142022 Invoice 06/30/2022 152 - SAN FRANCISCO BLVD - 05.11.2022 - 07… 0.00 482.31
01.41.61703 UTILITIES-WATER 152 - SAN FRANCISCO BLVD - 05.1… 482.31 216-07122022 Invoice 06/30/2022 216 - 237 CRESCENT RD - 05.06.2022 - 07.07… 0.00 365.15
01.81.61703 UTILITIES-WATER 216 - 237 CRESCENT RD - 05.06.2… 365.15 307-07122022 Invoice 06/30/2022 307 - 237 CRESCENT RD - 05.06.2022 - 07.07… 0.00 149.89
01.81.61703 UTILITIES-WATER 307 - 237 CRESCENT RD - 05.06.2… 149.89 495-07142022 Invoice 06/30/2022 495 - MAGNOLIA AVE - 05.11.2022 - 07.11.2… 0.00 167.81
01.42.61703 UTILITIES-WATER 495 - MAGNOLIA AVE - 05.11.2022… 167.81 665-07142022 Invoice 06/30/2022 665- SAN FRANCISCO BLVD - 05.11.2022 - 07… 0.00 319.96
01.42.61703 UTILITIES-WATER 665- SAN FRANCISCO BLVD - 05.11… 319.96 752-07142022 Invoice 06/30/2022 752 - SUNNY HILLS DRIVE - 05.11.2022 - 07.1… 0.00 486.04
01.81.61703 UTILITIES-WATER 752 - SUNNY HILLS DRIVE - 05.11.… 486.04 761-07142022 Invoice 06/30/2022 761 - RED HILL & SEQOUIA - 05.11.2022 - 07.… 0.00 333.88
01.81.61703 UTILITIES-WATER 761 - RED HILL & SEQUOIA - 05.11… 333.88 808-07142022 Invoice 06/30/2022 808 - TH DEPTS - 05.11.2022 - 07.11.2022 0.00 721.92
01.12.61703 UTILITIES-WATER 808 - TH DEPTS - 05.11.2022 - 07.… 86.63
01.18.61703 UTILITIES-WATER 808 - TH DEPTS - 05.11.2022 - 07.… 64.97
01.30.61703 UTILITIES-WATER 808 - TH DEPTS - 05.11.2022 - 07.… 469.25
01.41.61703 UTILITIES-WATER 808 - TH DEPTS - 05.11.2022 - 07.… 64.97
01.71.61703 UTILITIES-WATER 808 - TH DEPTS - 05.11.2022 - 07.… 36.10 939-07142022 Invoice 06/30/2022 939 - 634 SAN ANSELMO AVE - 05.11.22 - 07… 0.00 83.29
01.81.61703 UTILITIES-WATER 939 - 634 SAN ANSELMO AVE - 05… 83.29 943-07142022 Invoice 06/30/2022 943 - 237 CRESCENT RD - 05.11.2022 - 07.11… 0.00 1,210.32
01.81.61703 UTILITIES-WATER 943 - 237 CRESCENT RD - 05.11.2… 1,210.32 **Void** 07/21/2022 Regular 0.00 0.00 94511
01036 Matrix HG Inc 07/21/2022 Regular 0.00 660.00 94512 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 159959 Invoice 06/30/2022 06.30.2022 - TH QUARTERLY MAINTNENACE … 0.00 660.00
01.11.61506 BLDG. MAINT-OTHER 06.30.2022 - TH QUARTERLY MAI… 66.00
01.12.61505 BLDG. MAINT-HEAT/AIR 06.30.2022 - TH QUARTERLY MAI… 118.80
01.18.61505 BLDG. MAINT-HEAT/AIR 06.30.2022 - TH QUARTERLY MAI… 52.80
01.41.61505 BLDG. MAINT-HEAT/AIR 06.30.2022 - TH QUARTERLY MAI… 204.60
01.71.61505 BLDG. MAINT-HEAT/AIR 06.30.2022 - TH QUARTERLY MAI… 217.80 00128 Pacific Gas & Electric 07/21/2022 Regular 0.00 1,886.03 94513 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
41 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 19 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 146-07132022 Invoice 06/30/2022 146 - TOWN UTILITIES - 06.07.22 - 07.06.22 0.00 1,362.48
01.12.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 52.59
01.12.61702 UTILITIES-GAS 146 - TOWN UTILITIES - 06.07.22 -… 4.22
01.18.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 33.79
01.18.61702 UTILITIES-GAS 146 - TOWN UTILITIES - 06.07.22 -… 2.72
01.30.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 254.78
01.30.61702 UTILITIES-GAS 146 - TOWN UTILITIES - 06.07.22 -… 20.33
01.41.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 33.79
01.41.61702 UTILITIES-GAS 146 - TOWN UTILITIES - 06.07.22 -… 2.72
01.42.61707 UTILITIES-SIGNALS 146 - TOWN UTILITIES - 06.07.22 -… 90.33
01.42.61708 UTILITIES-STREET LIGHTS 146 - TOWN UTILITIES - 06.07.22 -… 391.85
01.71.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 89.65
01.71.61702 UTILITIES-GAS 146 - TOWN UTILITIES - 06.07.22 -… 10.90
01.81.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 43.19
21.65.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 63.76
21.65.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 41.01
31.41.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 113.22
31.41.61702 UTILITIES-GAS 146 - TOWN UTILITIES - 06.07.22 -… 71.67
34.41.61701 UTILITIES-ELECTRICITY 146 - TOWN UTILITIES - 06.07.22 -… 25.61
34.41.61702 UTILITIES-GAS 146 - TOWN UTILITIES - 06.07.22 -… 16.35 216-07142022 Invoice 06/30/2022 216 - IMAGINATION PARK - 06.07.2022 - 07.… 0.00 166.29
14.81.61701 UTILITIES-ELECTRICITY 216 - IMAGINATION PARK - 06.07.… 166.29 355-07122022 Invoice 06/30/2022 355 - CORPYARD UTILITIES - 06.06.2022 - 07.… 0.00 345.40
01.42.61701 UTILITIES-ELECTRICITY 355 - CORPYARD UTILITIES - 06.06… 345.40 717-07072022 Invoice 06/30/2022 717 - CORPYARD UTILITIES - 06.07.2022 - 07.… 0.00 11.86
01.42.61702 UTILITIES-GAS 717 - CORPYARD UTILITIES - 06.07… 11.86 **Void** 07/21/2022 Regular 0.00 0.00 94514
00181 Ross Valley Fire Department 07/21/2022 Regular 0.00 2,569.40 94515 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008001 Invoice 06/30/2022 06.30.2022 - FEES COLLECTED - JUNE 2022 0.00 2,569.40
01.00.20354 DUE TO ROSS VALLEY FIRE … 06.30.2022 - FEES COLLECTED - J… 2,569.40 01359 Siegfried Engineering Inc 07/21/2022 Regular 0.00 3,889.50 94516 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 43859 Invoice 06/30/2022 06.30.2022 - ENGINEERING SRVC - CRESCENT… 0.00 3,889.50
01.41.61150 OUTSIDE SERVICES-OTHER 06.30.2022 - ENGINEERING SRVC -… 3,889.50 02087 Telecom Law Firm PC 07/21/2022 Regular 0.00 2,350.00 94517 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 12732 Invoice 06/30/2022 06.07.2022 - DRAFTING DOCUMENTS - PROJ… 0.00 2,350.00
01.00.20371 PLANNING COSTS TO BE RE… 06.07.2022 - DRAFTING DOCUME… 2,350.00 02411 23 ELEPHANTS THEATRE COMPANY 07/21/2022 Regular 0.00 5,897.50 94518 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008010 Invoice 07/21/2022 07.19.2022 - MOANA JR. - SUMMER CAMP 0.00 5,897.50
21.63.61186 SPECIALTY CAMPS SERVICES 07.19.2022 - MOANA JR. - SUMM… 5,897.50 01005 Association of Bay Area Governments 07/21/2022 Regular 0.00 4,019.00 94519 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount AR029217 Invoice 07/21/2022 07.01.2022 - ABAG MEMBERSHIP FEES - FY2… 0.00 4,019.00
01.21.61112 OUTSIDE SRVS: ABAG ME… 07.01.2022 - ABAG MEMBERSHIP … 4,019.00 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
42 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 20 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number 00388 Baker & Taylor 07/21/2022 Regular 0.00 301.61 94520 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 50178025484 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 20.58
01.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 20.58 5017802574 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 19.58
01.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 19.58 5017802575 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 19.28
27.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 19.28 5017802576 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 19.92
27.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 19.92 5017802577 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 39.83
01.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 39.83 5017802578 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 17.99
01.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 17.99 5017802579 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 21.13
27.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 21.13 5017802580 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 41.14
01.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 41.14 5017802581 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 31.05
27.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 31.05 5017802582 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 50.83
01.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 50.83 5017802583 Invoice 07/21/2022 07.07.2022 - LIBRARY - ADULT BOOKS 0.00 20.28
01.71.62301 ADULT BOOKS 07.07.2022 - LIBRARY - ADULT BO… 20.28 01917 Brent Wyse 07/21/2022 Regular 0.00 2,266.20 94521 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008004 Invoice 07/21/2022 07.14.2022 - BASKETBALL CAMP - 2022 0.00 2,266.20
21.63.61183 CAMP SPORTS SERVICES 07.14.2022 - BASKETBALL CAMP - … 2,266.20 064 California Building Standards Commission 07/21/2022 Regular 0.00 472.86 94522 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INVOOO8012 Invoice 07/21/2022 07.19.2022 - BSASRF - 2ND QTR 0.00 472.86
01.00.20310 BUILDING: STATE GREEN B… 07.19.2022 - BSASRF - 2ND QTR 472.86 01689 Department of Conservation 07/21/2022 Regular 0.00 828.90 94523 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008003 Invoice 07/21/2022 07.19.2022 - STRONG MOTION - HAZARD M… 0.00 828.90
01.00.20302 BUILDING: STATE SEISMIC … 07.19.2022 - STRONG MOTION - … 828.90 02732 Diesel Direct West 07/21/2022 Regular 0.00 258.17 94524 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 84637632 Invoice 07/21/2022 07.12.2022 - ULSD DYED - 32.7 GALLONS - S… 0.00 258.17
01.42.62988 VEHICLE-FUEL/OIL/TIRES 07.12.2022 - ULSD DYED - 32.7 GA… 258.17 00092 Ewing Irrigation Products 07/21/2022 Regular 0.00 328.64 94525 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 17228885 Invoice 07/21/2022 07.05.2022 - MISC IRRIGATION SUPPLIES - C… 0.00 328.64
01.81.62200 DEPARTMENTAL SUPPLIES 07.05.2022 - MISC IRRIGATION SU… 328.64 00017 Fairfax Building Supply Co. Inc. 07/21/2022 Regular 0.00 17.61 94526 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
43 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 21 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 249813 Invoice 07/21/2022 07.20.2022 - HOSE BIB - CORPYARD 0.00 17.61
01.81.62200 DEPARTMENTAL SUPPLIES 07.20.2022 - HOSE BIB - CORPYARD 17.61 02606 Halleh Besharati 07/21/2022 Regular 0.00 3,130.40 94527 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008011 Invoice 07/21/2022 07.18.2022 - FITNESS BOOTCAMP - SUMMER 0.00 3,130.40
21.63.61186 SPECIALTY CAMPS SERVICES 07.18.2022 - FITNESS BOOTCAMP … 3,130.40 00020 Hannibal's Inc Electrical Construction 07/21/2022 Regular 0.00 189.00 94528 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 24802 Invoice 07/21/2022 07.13.2022 - ELECTRICIANS LABOR - STATION… 0.00 189.00
01.32.61506 BLDG. MAINT-OTHER 07.13.2022 - ELECTRICIANS LABOR… 189.00 03281 Jaime E. Valle 07/21/2022 Regular 0.00 6,820.00 94529 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 071522 Invoice 07/21/2022 07.16.2022 - PLAN CHECK & INSPECTION SE… 0.00 6,820.00
01.41.61157 PLAN CHECKING 07.16.2022 - PLAN CHECK & INSP… 6,820.00 00113 Juan Olsen Sanchez 07/21/2022 Regular 0.00 400.00 94530 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008008 Invoice 07/21/2022 07.19.2022 - GYMNASTICS - CAMP KIDMARI… 0.00 400.00
21.63.61179 PARKSIDE SERVICES 07.19.2022 - GYMNASTICS - CAMP… 140.00
21.63.61184 CAMP KIDMARIN MIGHTY … 07.19.2022 - GYMNASTICS - CAMP… 260.00 00113 Juan Olsen Sanchez 07/21/2022 Regular 0.00 3,000.00 94531 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008006 Invoice 07/21/2022 07.18.2022 - GYNASTICS - PAYMENT 4 - SU… 0.00 3,000.00
21.61.61167 TUMBLING SERVICES 07.18.2022 - GYNASTICS - PAYME… 3,000.00 01280 Kripa N. Davis 07/21/2022 Regular 0.00 2,402.40 94532 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008009 Invoice 07/21/2022 07.18.2022 - CARPENTRY FOR KIDS - 07.11 - … 0.00 2,402.40
21.63.61186 SPECIALTY CAMPS SERVICES 07.18.2022 - CARPENTRY FOR KIDS… 2,402.40 00029 Marin IT 07/21/2022 Regular 0.00 22.65 94533
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2022-23998 Invoice 07/21/2022 07.12.2022 - ADAPTER FOR LENOVO LAPTOP 0.00 22.65
42.21.63003 COMPUTER HARDWARE/S… 07.12.2022 - ADAPTER FOR LENO… 22.65 00160 OCLC 07/21/2022 Regular 0.00 23.96 94534
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 1000228334 Invoice 07/21/2022 07.01.2022 - CATALOGING & META DATA - S… 0.00 23.96
01.71.61150 OUTSIDE SERVICES-OTHER 07.01.2022 - CATALOGING & MET… 23.96 03211 ODP Business Solutions LLC 07/21/2022 Regular 0.00 599.53 94535 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 252550990001 Invoice 07/21/2022 07.11.2022 - TONER - OFFICE SUPPLIES - LIB… 0.00 413.69
01.71.62000 OFFICE SUPPLIES 07.11.2022 - TONER - OFFICE SUP… 413.69 254849822001 Invoice 07/21/2022 07.14.2022 - OFFICE SUUPLIES - ADMIN 0.00 185.84 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
44 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 22 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number
01.12.62000 OFFICE SUPPLIES 07.14.2022 - OFFICE SUUPLIES - A… 185.84 00558 Peterson 07/21/2022 Regular 0.00 1,107.10 94536
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2744701 Invoice 07/21/2022 07.11.2022 - GENERATOR - STATION 19 0.00 1,107.10
01.41.61150 OUTSIDE SERVICES-OTHER 07.11.2022 - GENERATOR - STATI… 1,107.10 03288 Rachel Weill Levitt 07/21/2022 Regular 0.00 275.00 94537 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008007 Invoice 07/21/2022 07.19.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 275.00
60.14.62903 PICNICS ON PLAZA 07.19.2022 - SAN ANSELMO LIVE -… 275.00 00181 Ross Valley Fire Department 07/21/2022 Regular 0.00 399,162.58 94538 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008002 Invoice 07/21/2022 07.15.2022 - MONTHLY CONTRIBUTION - JU… 0.00 399,162.58
01.32.61139 RVFS CONTRACT 07.15.2022 - MONTHLY CONTRIB… 399,162.58 03287 Steve Teijeiro 07/21/2022 Regular 0.00 938.00 94539 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008005 Invoice 07/21/2022 07.14.2022 - SKATE CAMP 0.00 938.00
21.63.61183 CAMP SPORTS SERVICES 07.14.2022 - SKATE CAMP 938.00 00348 The Bank of New York Mellon 07/21/2022 Regular 0.00 100.00 94540 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 252-2482359 Invoice 07/21/2022 07.05.2022 - REDEMPTION NOTICE FEE 0.00 100.00
29.00.61143 OUTSIDE SERVICES: BOND… 07.05.2022 - REDEMPTION NOTIC… 100.00 00352 Tyler Technologies Inc 07/21/2022 Regular 0.00 21,970.91 94541 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 025-387386 Invoice 07/21/2022 08.01.2022 - MAINTENANCE START - 22-23 0.00 21,970.91
42.21.63003 COMPUTER HARDWARE/S… 08.01.2022 - MAINTENANCE STAR… 21,970.91 00391 Verizon Wireless 07/21/2022 Regular 0.00 1,214.04 94542 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 9911040806 Invoice 07/21/2022 07.12.2022 - TH TELEPHONE SRVC - 06.13. - … 0.00 1,214.04
01.12.61705 UTILITIES-TELEPHONE 07.12.2022 - TH TELEPHONE SRVC … 172.11
01.18.61705 UTILITIES-TELEPHONE 07.12.2022 - TH TELEPHONE SRVC … 38.01
01.41.61705 UTILITIES-TELEPHONE 07.12.2022 - TH TELEPHONE SRVC … 639.54
01.42.61705 UTILITIES-TELEPHONE 07.12.2022 - TH TELEPHONE SRVC … 261.54
21.63.61179 PARKSIDE SERVICES 07.12.2022 - TH TELEPHONE SRVC … 51.42
21.63.61187 ROBSON AFTER SCHOOL S… 07.12.2022 - TH TELEPHONE SRVC … 51.42 02905 Wells Fargo Vendor Financial Services, LLC 07/21/2022 Regular 0.00 918.65 94543 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 5020983537 Invoice 07/21/2022 07.12.2022 - CANON COPIER LEASE - JULY 2… 0.00 918.65
01.12.61402 COPY MACHINE LEASE 07.12.2022 - CANON COPIER LEAS… 229.66
01.18.61402 COPY MACHINE LEASE 07.12.2022 - CANON COPIER LEAS… 229.66
01.41.61402 COPY MACHINE LEASE 07.12.2022 - CANON COPIER LEAS… 229.66
21.65.62200 DEPARTMENTAL SUPPLIES 07.12.2022 - CANON COPIER LEAS… 229.67 00054 ASCAP 07/27/2022 Regular 0.00 31.41 94544
ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
45 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 23 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 500595724 Invoice 07/28/2022 07.20.2022 - LICENSE FEE - FINANCE CHARGE 0.00 31.41
60.14.61901 ASCAP ROYALTIES - EVENTS 07.20.2022 - LICENSE FEE - FINAN… 31.41 00408 Astro Jump of Northbay 07/27/2022 Regular 0.00 269.00 94545 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 10513645 Invoice 07/28/2022 07.26.2022 - JUMPY FOR CAMP KIDMARIN -… 0.00 269.00
21.63.61179 PARKSIDE SERVICES 07.26.2022 - JUMPY FOR CAMP KI… 134.50
21.63.61184 CAMP KIDMARIN MIGHTY … 07.26.2022 - JUMPY FOR CAMP KI… 134.50 00001 AT&T Calnet 07/27/2022 Regular 0.00 450.68 94546
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 000018519139 Invoice 07/28/2022 634 - TRAFFIC LIGHT MODEM - 06.20.22 - 07… 0.00 450.68
01.42.61707 UTILITIES-SIGNALS 634 - TRAFFIC LIGHT MODEM - 06… 450.68 03291 Benjamin L. Wolin 07/27/2022 Regular 0.00 500.00 94547 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008033 Invoice 07/28/2022 07.26.2022 - SAN ANSELMO LIVE - BAND FEES 0.00 500.00
60.14.62903 PICNICS ON PLAZA 07.26.2022 - SAN ANSELMO LIVE -… 500.00 00276 BK Krill Corp 07/27/2022 Regular 0.00 180.00 94548 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 1534 Invoice 07/28/2022 07.19.2022 - REC DEPT - MARKETING - SUM… 0.00 180.00
21.65.61905 PROMOTION/MARKETING 07.19.2022 - REC DEPT - MARKETI… 180.00 01876 Chess Wizards 07/27/2022 Regular 0.00 2,304.40 94549 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008039 Invoice 07/28/2022 07.26.2022 - CHESS WIZARDS CAMP - SUM… 0.00 2,304.40
21.63.61186 SPECIALTY CAMPS SERVICES 07.26.2022 - CHESS WIZARDS CA… 2,304.40 01042 County of Marin - Central Collections 07/27/2022 Regular 0.00 10,428.67 94550 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008013 Invoice 07/28/2022 07.15.2022 - LAFCO CHARGES - FY22-23 0.00 10,428.67
01.21.61124 OUTSIDE SVCS-LAFCO 07.15.2022 - LAFCO CHARGES - FY… 10,428.67 03293 Darren Nelson 07/27/2022 Regular 0.00 550.00 94551 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008041 Invoice 07/28/2022 07.26.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 550.00
60.14.62903 PICNICS ON PLAZA 07.26.2022 - SAN ANSELMO LIVE -… 550.00 03293 Darren Nelson 07/27/2022 Regular 0.00 -550.00 94551 00533 Davis Sign Company 07/27/2022 Regular 0.00 2,164.72 94552 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 35401 Invoice 07/28/2022 07.22.2022 - MEASURE D SIGNS - HARDWARE 0.00 2,164.72
01.42.62908 SUPPLIES-STREET MAINTE… 07.22.2022 - MEASURE D SIGNS - … 2,164.72 03194 East Bay Tire Co 07/27/2022 Regular 0.00 239.24 94553 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 1852290 Invoice 07/28/2022 07.15.2022 - VEHICLE REPAIR - CORPYARD 0.00 239.24
01.42.62988 VEHICLE-FUEL/OIL/TIRES 07.15.2022 - VEHICLE REPAIR - CO… 239.24 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
46 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 24 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number 00017 Fairfax Building Supply Co. Inc. 07/27/2022 Regular 0.00 131.89 94554 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 249900 Invoice 07/28/2022 07.21.2022 - MISC HARDWARE/CLAMPS - C… 0.00 19.52
01.81.62200 DEPARTMENTAL SUPPLIES 07.21.2022 - MISC HARDWARE/C… 19.52 250066 Invoice 07/28/2022 07.25.2022 - MISC HARDWARE - CORPYARD 0.00 112.37
01.81.62200 DEPARTMENTAL SUPPLIES 07.25.2022 - MISC HARDWARE - … 112.37 03084 Gary Kaye 07/27/2022 Regular 0.00 550.00 94555
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008040 Invoice 07/28/2022 07.26.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 550.00
60.14.62903 PICNICS ON PLAZA 07.26.2022 - SAN ANSELMO LIVE -… 550.00 02606 Halleh Besharati 07/27/2022 Regular 0.00 5,355.00 94556 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008036 Invoice 07/28/2022 07.26.2022 - DANCING DAISIES HIP HOP CA… 0.00 5,355.00
21.63.61186 SPECIALTY CAMPS SERVICES 07.26.2022 - DANCING DAISIES HI… 5,355.00 02399 HdL Coren & Cone 07/27/2022 Regular 0.00 1,936.80 94557 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount SIN020035 Invoice 07/28/2022 07.18.2022 - CONTRACT SERVICES - PROPER… 0.00 1,936.80
01.12.61150 OUTSIDE SERVICES-OTHER 07.18.2022 - CONTRACT SERVICES … 1,936.80 03008 Jara, Inc, 07/27/2022 Regular 0.00 261.45 94558
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008038 Invoice 07/28/2022 07.26.2022 - CAMP KIDMARIN - WEEK 7/63 … 0.00 261.45
21.63.61179 PARKSIDE SERVICES 07.26.2022 - CAMP KIDMARIN - … 95.45
21.63.61184 CAMP KIDMARIN MIGHTY … 07.26.2022 - CAMP KIDMARIN - … 166.00 03060 JOE SAUNDERS 07/27/2022 Regular 0.00 300.00 94559 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008035 Invoice 07/28/2022 07.26.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 300.00
60.14.62903 PICNICS ON PLAZA 07.26.2022 - SAN ANSELMO LIVE -… 300.00 00113 Juan Olsen Sanchez 07/27/2022 Regular 0.00 330.00 94560 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008037 Invoice 07/28/2022 07.26.2022 - GYMNASTICS CAMP - SUMMER… 0.00 330.00
21.63.61179 PARKSIDE SERVICES 07.26.2022 - GYMNASTICS CAMP -… 125.00
21.63.61184 CAMP KIDMARIN MIGHTY … 07.26.2022 - GYMNASTICS CAMP -… 205.00 00029 Marin IT 07/27/2022 Regular 0.00 324.42 94561
Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2022-118421 Invoice 07/28/2022 07.13.2022 - ATLONA AMPLIFIER - OTHER C… 0.00 324.42
42.21.63003 COMPUTER HARDWARE/S… 07.13.2022 - ATLONA AMPLIFIER -… 324.42 02754 MAYACAMAS MOUNTAIN SPRING WATER 07/27/2022 Regular 0.00 90.50 94562 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
47 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 25 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 66917 Invoice 07/28/2022 07.25.2022 - BOTTLED WATER SRVC - TOWN… 0.00 90.50
01.12.62200 DEPARTMENTAL SUPPLIES 07.25.2022 - TH BOTTLED WATER … 22.61
01.18.62200 DEPARTMENTAL SUPPLIES 07.25.2022 - TH BOTTLED WATER … 22.63
01.41.62200 DEPARTMENTAL SUPPLIES 07.25.2022 - TH BOTTLED WATER … 22.63
01.71.62200 DEPARTMENTAL SUPPLIES 07.25.2022 - TH BOTTLED WATER … 22.63 03292 Neanderthal Touring, LLC 07/27/2022 Regular 0.00 500.00 94563 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008034 Invoice 07/28/2022 07.26.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 500.00
60.14.62903 PICNICS ON PLAZA 07.26.2022 - SAN ANSELMO LIVE -… 500.00 03211 ODP Business Solutions LLC 07/27/2022 Regular 0.00 274.44 94564 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 255735536001 Invoice 07/28/2022 07.18.2022 - OFFICE SUPPLIES - DPW/PLANN… 0.00 46.66
01.18.62200 DEPARTMENTAL SUPPLIES 07.18.2022 - OFFICE SUPPLIES - D… 46.66 255741890001 Invoice 07/28/2022 07.16.2022 - OFFICE SUPPLIES - DPW/PLANN… 0.00 227.78
01.18.62200 DEPARTMENTAL SUPPLIES 07.16.2022 - OFFICE SUPPLIES - D… 227.78 00128 Pacific Gas & Electric 07/27/2022 Regular 0.00 14,400.00 94565 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 461-07222022 Invoice 07/28/2022 461 - TOWN HALL UTILITES - 06.08.22 - 07.07… 0.00 14,400.00
41.41.61701 UTILITIES-ELECTRICITY 461 - TOWN HALL UTILITES - 06.08… 14,400.00 00165 Pacific Telemanagement Services - PTS 07/27/2022 Regular 0.00 53.00 94566 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2090611 Invoice 07/28/2022 07.14.2022 - TOWN HALL PAYPHONE - AUG… 0.00 53.00
01.42.61705 UTILITIES-TELEPHONE 07.14.2022 - TOWN HALL PAYPH… 53.00 03296 Sustainable Marin 07/27/2022 Regular 0.00 250.00 94567 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2022-008 Invoice 07/28/2022 07.22.2022 - SPONSORSHIP FEE - 2022 0.00 250.00
90.41.61100 OUTSIDE SERVICES 07.22.2022 - SPONSORSHIP FEE - … 250.00 03294 Travis White 07/27/2022 Regular 0.00 300.00 94568 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008042 Invoice 07/28/2022 07.26.2022 - SAN ANSELMO LIVE - BAND FEE 0.00 300.00
60.14.62903 PICNICS ON PLAZA 07.26.2022 - SAN ANSELMO LIVE -… 300.00 00220 Underground Service Alert 07/27/2022 Regular 0.00 2,129.26 94569 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2022176567 Invoice 07/28/2022 07.20.2022 - MEMBERSHIP FEES - 2022 0.00 2,129.26
01.42.61150 OUTSIDE SERVICES-OTHER 07.20.2022 - MEMBERSHIP FEES - … 2,129.26 02931 AIS SPECIALTY PRODUCTS, INC. 07/27/2022 Regular 0.00 917.96 94570 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount PS1453167 Invoice 06/30/2022 06.24.2022 - AIS OFF AEROSOL - 1 DZ 0.00 917.96
01.81.62200 DEPARTMENTAL SUPPLIES 06.24.2022 - AIS OFF AEROSOL - 1… 917.96 00388 Baker & Taylor 07/27/2022 Regular 0.00 256.78 94571 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
48 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 26 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 5017319062 Invoice 06/30/2022 01.03.2022 - LIBRARY - CHILDRENS BOOKS 0.00 63.55
01.71.62302 CHILDRENS BOOKS 01.03.2022 - LIBRARY - CHILDRENS… 63.55 5017485419 Invoice 06/30/2022 01.11.2022 - LIBRARY - CHILDRENS BOOKS 0.00 22.92
27.71.62302 CHILDRENS BOOKS 01.11.2022 - LIBRARY - CHILDRENS… 22.92 5017485420 Invoice 06/30/2022 01.11.2022 - LIBRARY - CHILDRENS BOOKS 0.00 52.60
27.71.62302 CHILDRENS BOOKS 01.11.2022 - LIBRARY - CHILDRENS… 52.60 5017485421 Invoice 06/30/2022 01.11.2022 - LIBRARY - CHILDRENS BOOKS 0.00 13.15
27.71.62302 CHILDRENS BOOKS 01.11.2022 - LIBRARY - CHILDRENS… 13.15 5017485422 Invoice 06/30/2022 01.11.2022 - LIBRARY - CHILDRENS BOOKS 0.00 13.15
27.71.62302 CHILDRENS BOOKS 01.11.2022 - LIBRARY - CHILDRENS… 13.15 5017485423 Invoice 06/30/2022 01.11.2022 - LIBRARY - CHILDRENS BOOKS 0.00 18.79
01.71.62302 CHILDRENS BOOKS 01.11.2022 - LIBRARY - CHILDRENS… 18.79 5017485424 Invoice 06/30/2022 01.11.2022 - LIBRARY - CHILDRENS BOOKS 0.00 9.36
01.71.62302 CHILDRENS BOOKS 01.11.2022 - LIBRARY - CHILDRENS… 9.36 5017485425 Invoice 06/30/2022 01.11.2022 - LIBRARY - CHILDRENS BOOKS 0.00 13.81
01.71.62302 CHILDRENS BOOKS 01.11.2022 - LIBRARY - CHILDRENS… 13.81 5017551130 Invoice 06/30/2022 02.12.2022 - LIBRARY - CHILDRENS BOOKS 0.00 49.45
01.71.62302 CHILDRENS BOOKS 02.12.2022 - LIBRARY - CHILDRENS… 49.45 00007 Bay Cities Joint Power Insurance Authority 07/27/2022 Regular 0.00 1,178.00 94572 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount BCJPIA-2022-279 Invoice 06/30/2022 07.26.2022 - WORKERS COMP CLAIMS - JUNE… 0.00 1,178.00
40.21.61907 WORKERS COMPENSATION… 07.26.2022 - WORKERS COMP CLA… 1,178.00 02581 CSG Consultants 07/27/2022 Regular 0.00 460.00 94573 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 44984 Invoice 06/30/2022 07.15.2022 - BUILDING INSPECTOR SRVCS - … 0.00 460.00
01.41.61157 PLAN CHECKING 07.15.2022 - BUILDING INSPECTOR… 460.00 02278 Gardeners' Guild 07/27/2022 Regular 0.00 5,498.00 94574 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 109204 Invoice 06/30/2022 07.22.2022 - RED HILL MEDIAN - 06.10.2022 0.00 5,498.00
01.42.61150 OUTSIDE SERVICES-OTHER 07.22.2022 - RED HILL MEDIAN - 0… 5,498.00 03290 Houseal Lavigne Associates 07/27/2022 Regular 0.00 2,585.00 94575 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 5668 Invoice 06/30/2022 07.22.2022 - PROFESSIONAL CONSULTING - … 0.00 2,585.00
01.18.61150 OUTSIDE SERVICES-OTHER 07.22.2022 - PROFESSIONAL CON… 2,585.00 00704 Liebert Cassidy Whitmore 07/27/2022 Regular 0.00 230.00 94576 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 222246 Invoice 06/30/2022 06.30.2022 - LEGAL COUNCIL - ERMA 0.00 230.00
01.16.61109 OUTSIDE SERVICES-LITIGAT… 06.30.2022 - LEGAL COUNCIL - E… 230.00 03130 Lorraine Weiss 07/27/2022 Regular 0.00 2,240.00 94577 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount SA2022-6 Invoice 06/30/2022 06.26.2022 - PLANNING APPLICATIONS - 14 … 0.00 2,240.00
01.18.60010 TEMPORARY HELP 06.26.2022 - PLANNING APPLICAT… 2,240.00 00142 Marin Municipal Water District 07/27/2022 Regular 0.00 249.87 94578 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
49 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 27 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 622-07142022 Invoice 06/30/2022 622 - IMAGINATION PARK - 05.11.2022 - 07.… 0.00 83.29
14.81.61150 OUTSIDE SERVICES-OTHER 622 - IMAGINATION PARK - 05.11.… 83.29 623-07142022 Invoice 06/30/2022 623 - IMAGINATION PARK - 05.11.2022 - 07.… 0.00 83.29
14.81.61150 OUTSIDE SERVICES-OTHER 623 - IMAGINATION PARK - 05.11.… 83.29 624-07142022 Invoice 06/30/2022 624 - IMAGINATION PARK - 05.11.2022 - 07.… 0.00 83.29
14.81.61150 OUTSIDE SERVICES-OTHER 624 - IMAGINATION PARK - 05.11.… 83.29 00166 Parisi Transportation Consulting 07/27/2022 Regular 0.00 1,975.00 94579 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 19009 Invoice 06/30/2022 07.26.2022 - PROFESSIONAL SEVICES - JUNE … 0.00 1,975.00
01.41.61150 OUTSIDE SERVICES-OTHER 07.26.2022 - PROFESSIONAL SEVI… 1,975.00 02554 Parkmobile LLC 07/27/2022 Regular 0.00 167.70 94580 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV29277 Invoice 06/30/2022 06.30.2022 - END USER FEES - JUNE 2022 0.00 167.70
01.12.61107 OUTSIDE SVCS-ACCOUNTI… 06.30.2022 - END USER FEES - JU… 167.70 00211 Tim Musselman 07/27/2022 Regular 0.00 450.00 94581 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008032 Invoice 06/30/2022 07.26.2022 - BAMBINO BASEBALL - MARCH -… 0.00 450.00
21.61.61160 BASEBALL EXPENSES 07.26.2022 - BAMBINO BASEBALL … 450.00 00362 Town of San Anselmo 07/11/2022 Bank Draft 0.00 208,905.25 DFT03702 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0007944 Invoice 07/11/2022 07.15.2022 To fund payroll 0.00 208,905.25
01.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll 144,501.92
01.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll -1,225.87
12.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll 8,446.86
12.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll -46.25
19.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll 4,612.09
21.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll 39,255.64
21.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll -230.00
27.00.20299 PAYROLL PAYABLE 07.15.2022 To fund payroll 13,590.86 01281 Payroll Resources Group 07/12/2022 Bank Draft 0.00 85.00 DFT03706 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 8233 Invoice 07/12/2022 July 2022 S125 Processing Fees 0.00 85.00
01.12.61107 OUTSIDE SVCS-ACCOUNTI… July 2022 S125 Processing Fees 85.00 00362 Town of San Anselmo 07/26/2022 Bank Draft 0.00 170,967.11 DFT03725 ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
50 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 28 of 29
Vendor Number Vendor Name Payment Date Payment Type Discount Amount Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0008031 Invoice 07/26/2022 7-31-2022 TSA To Fund Payroll 0.00 170,967.11
01.00.20299 PAYROLL PAYABLE 119,893.94
01.00.20299 PAYROLL PAYABLE -1,225.87
12.00.20299 PAYROLL PAYABLE 5,934.25
12.00.20299 PAYROLL PAYABLE -46.25
19.00.20299 PAYROLL PAYABLE 3,531.83
21.00.20299 PAYROLL PAYABLE 32,621.04
21.00.20299 PAYROLL PAYABLE -230.00
27.00.20299 PAYROLL PAYABLE 10,488.17
Regular Checks
Manual Checks
Voided Checks
Discount
Payment
Payment Type Count
Bank Code AP Summary
Bank Drafts
EFT's
160
0 12
3 0
0.00 0.00
0.00 0.00
0.00 175 0.00
Payment
3,060,390.23
0.00 -7,082.40
379,957.36
0.00 3,433,265.19
Payable
Count
346
0 0
3 0
349
ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
51 Check Report Date Range: 07/01/2022 - 07/31/2022
8/16/2022 8:19:10 PM Page 29 of 29
All Bank Codes Check Summary
Payment Type Discount
Payment
Count Payment
Payable
Count
Regular Checks
Manual Checks
Voided Checks
Bank Drafts
EFT's
160
0 12
3 0
0.00 0.00
0.00 0.00
0.00 175 0.00
3,060,390.23
0.00 -7,082.40
379,957.36
0.00 3,433,265.19
346
0 0
3 0
349
Fund Name Period Amount
Fund Summary
99 POOLED CASH - OPERATING 7/2022 3,433,265.19
3,433,265.19
ITEM 2.2 - ATTACHMENT 1
ITEM 2.2 - ATTACHMENT 1
52 Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 2.3.
FROM:
Megan H. Acevedo, Town Attorney
SUBJECT:
Consider Adoption of Resolution to Allow for Virtual Town Council Meetings in Compliance with AB 361.
RECOMMENDATION
That the Town Council adopt the attached resolution making findings pursuant to AB 361 to support continued use of teleconferencing/videoconferencing to hold public meetings of the Town Council and Town legislative bodies during the continuing state of emergency proclaimed by Governor Newsom on March 4, 2020. (Attachment 1).
BACKGROUND
On March 4, 2020, Governor Newsom declared a state of emergency pursuant to Government Code section 8625 due to COVID-19. Recognizing the need to promote social distancing while allowing local legislative bodies to continue operating during the emergency, Governor Newsom signed Executive Orders N-25-20, N-29 -20, and N-08-21, which suspended provisions of the Brown Act. Those Orders permitted legislative bodies to hold virtual meetings; however, the relevant provisions expired on September 30, 2021.
On September 16, 2021, Governor Newsom signed AB 361, which extends the authority of public agencies to conduct meetings by teleconference, including video conference, during State-declared emergencies.
Specifically, the bill provides that a legislative body may hold virtual meetings where there is a proclaimed state of emergency and state or local officials have imposed or recommended measures to promote social distancing. (Cal. Gov. Code § 54953(e)(1)(A)).
On September 22, 2021, the Marin County Director of Health & Human Services, Benita McLarin, sent a letter to the Marin County Board of Supervisors recommending continued social distancing for local government meetings.
Local government meetings are indoor meetings that are sometimes crowded, involve many different and unfamiliar households, and can last many hours. Given those circumstances, I recommend a continued emphasis on social distancing measures as much as possible to make public meetings as safe as possible. These measures can include using video/teleconferencing when it meets community needs and spacing at in-person meetings so that individuals from different households are not sitting next to each other.
Ms. McLarin has confirmed that these recommendations remain in place, including in her letter to the Board on July 19, 2022.
Town of San Anselmo Page 1 of 3 Printed on 8/18/2022
powered by Legistar™ 53
TO: Town Council 8/23/2022 Item #: 2.3.
On November 26, 2021, the World Health Organization (WHO) classified a new variant, B.1.1.529, as a Variant of Concern and named it Omicron and on November 30, 2021, the United States also classified it as a Variant of Concern. On December 1, 2021, the California and San Francisco Departments of Public Health confirmed that a recent case of COVID-19 in California was caused by the Omicron variant. Omicron is more contagious than previous variants and spread rapidly. On January 10, 2022, the U.S. reported 1,400,000 positive COVID cases in a single day. On February 22, 2022, the World Health Organization identified a second Omicron variant as a variant of concern and case rates have risen as a result of its spread.
On October 12, 2021, November 9, 2021, December 14, 2021, January 11, 2022, February 8, 2022, March 8, 2022, and April 12, 2022, May 10, 2022, June 14, 2022, and July 26, 2022 the Town Council adopted resolutions with the requisite findings that the state of emergency is in effect, that measures to promote social distancing are still being recommended by local officials, and that the state of emergency directly impacts the ability of the public and the members of the Town Council to meet safely indoors in person.
On March 22, 2022, the Council voted for the month of April to have the option for Council to either meet in the Council Chambers or virtually and for the public to only meet virtually. Given the unpredictable spread of new COVID-19 variants and the nature of public meetings to bring different households into an enclosed room for extended periods of time, the Town Council indicated that remote meetings could be necessary beyond April and the Council has not requested that the issue return for their consideration. The Town Council also directed that, going forward, Town legislative bodies may make an independent determination about their use of the virtual meeting format. However, the Council limited the Committee and Commissions’ options to only those that allow for virtual public participation.
Council requested that staff be asked how they feel about attending in person meetings and staff indicated that they would prefer to be allowed to choose to be in person or virtual, just like the Council.
Finally, the Council asked staff to verify that Council members and Committee and Commission members who plan to participate in person at public meetings be vaccinated. Given the proof-of-vaccination requirement imposed by the Council, allowing virtual participation by Council and Committee members will ensure that all members can take part in the meetings, regardless of vaccination status.
The following San Anselmo committees meet monthly and have made the determination that they would like to continue meetings in the following format:
Arts Commission, Economic Development Committee and Planning Commission have decided to stay virtual for now.
Historical Commission, Open Space Committee and Parks and Recreation Commission have decided to hold hybrid meetings.
Climate Action Commission, Library Advisory Board, Racial Equity Ad Hoc Committee have not made a formal decision as of this report.
FISCAL IMPACT
Town of San Anselmo Page 2 of 3 Printed on 8/18/2022
powered by Legistar™ 54
TO: Town Council 8/23/2022 Item #: 2.3.
There would be no direct fiscal impact to the Town to approve this item.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
Adopting a resolution to establish the format for public meetings during a state of emergency is not a “project” under the California Environmental Quality Act (CEQA), because it does not involve an activity that has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub. Res. Code § 21065).
CONCLUSION
Staff respectfully requests that the Council adopt the attached resolution to allow for continued use of video/teleconferencing for public meetings.
Town of San Anselmo Page 3 of 3 Printed on 8/18/2022
powered by Legistar™ 55
ITEM 2.3 - ATTACHMENT 1
ITEM 2.3 - ATTACHMENT 1
RESOLUTION NO.
RESOLUTION REGARDING TELECONFERENCE AND
VIDEOCONFERENCE MEETINGS DURING THE COVID-19 STATE OF
EMERGENCY
WHEREAS, on March 4, 2020, Governor Newsom proclaimed pursuant to his authority under the California Emergency Services Act, California Government Code Section 8625, that a state of emergency exists due to a novel coronavirus (COVID- 19); and WHEREAS, on June 4, 2021, in lifting many restrictions that the State previously imposed due to COVID-19, the Governor indicated that those changes did not end the ongoing, proclaimed state of emergency; and
WHEREAS, as of the date of this Resolution, neither the Governor nor the Legislature have exercised their respective powers pursuant to California Government Code section 8629 to lift the state of emergency either by proclamation or by concurrent resolution in the state Legislature; and
WHEREAS, the continued local rates of transmission of the virus and variants causing COVID-19 are such that on September 22, 2021, the Marin County Director of Health & Human Services recommended that local government entities continue to emphasize social distancing in order to minimize the potential spread of COVID-19 during indoor, public meetings; and
WHEREAS, the County Director of Health & Human Services’ has confirmed her recommendation related to public meetings, including in a letter to the Board of Directors on June 21, 2022; and
WHEREAS, on November 26, 2021, the World Health Organization (WHO) classified a new variant, B.1.1.529, as a Variant of Concern and named it Omicron and on December 1, 2021, the California and San Francisco Departments of Public Health confirmed that the first case of COVID-19 in California caused by the Omicron variant; and WHEREAS, Omicron is a more contagious variant and by January 10, 2022, the U.S. reported 1,400,000 positive COVID-19 cases on a single day; and WHEREAS, on February 22, 2022, the WHO labeled a second version of Omicron to be a new variant of concern; and
WHEREAS, in light of the County’s recommendation and the current COVID-19 variant of concern, the Town Council desires to continue to have the flexibility, for itself and for all other Town legislative bodies, to meet by teleconference and/or videoconference; and
WHEREAS, adopting a resolution to establish the format for public meetings during a state of emergency is not a “project” under the California Environmental Quality Act (CEQA), 56 ITEM 2.3 - ATTACHMENT 1
ITEM 2.3 - ATTACHMENT 1
because it does not involve an activity that has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub. Res. Code § 21065).
NOW, THEREFORE, BE IT RESOLVED THAT:
1. The above recitals are hereby incorporated as if fully set forth herein.
2. There is an ongoing proclaimed state of emergency relating to the novel coronavirus causing the disease known as COVID-19.
3. The state of emergency continues to directly impact the ability of Town Council and standing committees and commissions to meet safely in person.
4. Local health officials, including the County Director of Health & Human Services continue to recommend social distancing during public meetings, including the use of tele/video conferencing.
5. Holding meetings with all attendees participating in person would present imminent risks to the health or safety of attendees, such that the conditions continue to exist pursuant to Government Code Section 54953(e)(3) to allow the Town of San Anselmo Town Council and Town legislative bodies to use teleconferencing to hold public meetings in accordance with Government Code section 54953(e)(2) to ensure members of the public have continued access to safely observe and participate in local government meetings.
PASSED AND ADOPTED at the regular meeting of the Town Council of the Town of San Anselmo held on the 23rd day of August, 2022, by the following vote:
AYES
NOES:
ABSENT:
_______________________________________
Alexis Fineman, Mayor
Attest:
________________________________________
Carla Kacmar, Town Clerk
57 Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 2.4.
FROM:
Sean Youra, Climate Action Coordinator; Erica Freeman, Building Official SUBJECT:
Response to 2021-2022 Marin Civil Grand Jury Report entitled Electrifying Marin’s Buildings: A Countywide Approach
RECOMMENDATION
Approve and authorize the Mayor to sign the attached response to the Marin County Civil Grand Jury Report entitled Electrifying Marin’s Buildings: A Countywide Approach.
BACKGROUND
In California, civil grand juries are authorized to “investigate and report upon the operations, accounts, and records of the officers, departments, functions, and the method or system of performing the duties of any such city or joint powers agency and make such recommendations as it may deem proper and fit” (Cal. Penal Code section 925a <https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml? lawCode=PEN§ionNum=925a.>). Within 90 days after the grand jury submits a report regarding the operations of any public agency, the “governing body of the public agency shall comment to the presiding judge of the superior court on the findings and recommendations pertaining to matters under the control of the governing body...” (Cal. Penal Code section 933(c)
<https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PEN§ionNum=933.>). The mayor is also required to comment on the findings and recommendations (Cal. Penal Code section 933(c) <https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PEN§ionNum=933.>).
On June 6, 2022, the Marin County Civil Grand Jury released a report entitled Electrifying Marin’s Buildings: A Countywide Approach (Attachment 1). The Grand Jury Report focused on the building sector as a primary contributor of greenhouse gas emissions and assessed existing and proposed programs and strategies to bring about the effective and equitable electrification of buildings in Marin. The Grand Jury has requested the Town to respond to Findings F1-F6 and Recommendations R1-R3. Under State law, the Town’s written response must be submitted to The Honorable Judge James Chou by September 6, 2022.
DISCUSSION
Staff has reviewed the Grand Jury Report and drafted proposed responses (Attachment 2). The responses show that the Town agrees with all of the findings. In addition, the Town has responded to the following Recommendations:
1. R1 (adopt a reach code banning natural gas connections in newly constructed buildings) - The Town has Town of San Anselmo Page 1 of 2 Printed on 8/18/2022
powered by Legistar™ 58
TO: Town Council 8/23/2022 Item #: 2.4.
already implemented this recommendation.
2. R2 (adopt a reach code requiring energy efficiency measures in connection with renovations of existing residential buildings) - The Town has not implemented this recommendation, but it may be implemented in the future as described in Attachment 2.
3. R3 (develop a comprehensive Countywide Building Electrification Plan to be completed on or before January 1, 2024) - This recommendation requires further analysis and collaboration with other Marin jurisdictions and entities.
FISCAL IMPACT
There is no direct fiscal impact associated with responding to the Grand Jury Report.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The Council’s consideration and approval of this item is not a “project” under the California Environmental Quality Act, because it does not involve an activity which has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub. Res. Code § 21065).
The Town’s Climate Action Plan includes Measure E-4: Green Building Reach Code, which includes adopting a green building ordinance for new and remodeled commercial and residential projects that requires green building methods and energy efficiency savings above the State building and energy codes. The Grand Jury Report’s recommendations encourage the adoption of green building ordinances for both new construction and renovations of existing residential buildings.
CONCLUSION
Staff recommends that the Town Council approve the attached responses to the Grand Jury Report.
Town of San Anselmo Page 2 of 2 Printed on 8/18/2022
powered by Legistar™ 59
2021–2022 MARIN COUNTY CIVIL GRAND JURY
ELECTRIFYING MARIN’S BUILDINGS:
A COUNTYWIDE APPROACH
June 6, 2022
SUMMARY
Marin County’s electricity supplies are becoming cleaner due to the expanding role played by solar and other renewable sources. As this trend continues, local governments have become increasingly engaged in reducing greenhouse gas emissions by electrifying the county’s transportation and building sectors. “Building electrification” refers to the elimination of natural gas-fueled appliances in households and businesses. It aims for adoption of four electric appliances: heat pump space heaters, heat pump water heaters, induction cooktops/ranges, and upgraded service panels. Because the life cycles of appliances are long—often 10 to 20 years or more—decisions made today can have long-term impacts. By one estimate, in order to fully electrify U.S. households before 2050, more than 80 million of these appliances in more than 50 million households would have to be replaced over the next decade.1 While policy-makers in Washington and Sacramento have an important role to play, change on this scale will be very difficult without robust engagement at the local level. The timely pursuit of building electrification will depend in no small measure on local regulations and consumer decisions that are shaped and supported by local communities.
Initial steps are currently being taken by the county and its cities to pave the way toward building electrification. But as the stakes grow higher with each passing year, the time has come for Marin to pursue an integrated and comprehensive countywide building electrification planning process that will strengthen and accelerate decision-making by public officials throughout the county.
In the discussion that follows, the Grand Jury addresses:
■ The critical role building electrification plays in advancing Marin County’s greenhouse gas reduction targets and in improving the health and safety of its residents ■ Proposed “reach” codes for adoption by local jurisdictions that would bring an end to natural gas connections in newly constructed buildings and enhance energy efficiency in homes undergoing renovation
1 Trevor Higgens, Bianca Majumder, Debbie Lai, Ari Matusiak, and Sam Calisch, To Decarbonize Households, electrifying all of Marin County’s buildings within a specified time period America Needs Incentives for Electric Appliances, June 3, 2021, https://www.americanprogress.org/article/decarbonize-households-america-needs-incentives-electric-appliances/.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
60 ■ A comprehensive countywide building electrification planning process aimed at potential building electrification strategies that should be addressed as part of a countywide planning process.
■ The importance of equity as a guiding principle in planning.
APPROACH
The Marin County Civil Grand Jury investigated the actions taken by Marin’s county, city, and town governments to reduce greenhouse gas emissions, including their identification of the sources of these emissions and their strategies to meet emission reduction goals established by state law and otherwise. The Grand Jury focused on the building sector as a primary contributor of greenhouse gas emissions and assessed existing and proposed programs and strategies to bring about the effective and equitable electrification of buildings in Marin.
In carrying out this investigation, the Grand Jury interviewed elected officials, department heads, and staff in the Marin County government and in Marin’s city and town governments; interviewed agency officials and non-profit advocacy groups engaged in climate change mitigation; and reviewed reports, studies, plans, and state and local laws dealing directly or indirectly with climate change mitigation.
In the course of its investigation, the Grand Jury repeatedly encountered individuals throughout county and local government who are passionate about their work and extremely well-informed about climate change impacts and mitigation measures. The findings and recommendations presented here are intended to offer a unique perspective afforded by the investigation and help promote an ongoing dialog among county staff, local jurisdictions, and the public on an important component of greenhouse gas reduction efforts.
BACKGROUND: WHY BUILDING ELECTRIFICATION MATTERS
The Increasing Urgency of Marin’s Efforts to Mitigate Climate Change This past year our nation has seen a variety of extreme weather-related impacts including offseason tornados, dramatic flooding, and wildfires at times and locations previously thought immune from such disasters. The hottest annual temperatures ever recorded worldwide have all occurred between 2016 and 2021.2 More intense and frequent heat waves, droughts, wildfires, and severe weather events are all results of climate change which are now manifesting throughout the country and the world. Marin County has recently experienced severe drought, ongoing heightened wildfire risk, and the slow creep of sea level rise along our shorelines. Given these developments, scientists and government leaders across the globe agree there is an increasing urgency to reduce greenhouse gas emissions if the worst impacts of climate change are to be avoided.
California has helped lead the way in framing the urgent need for prompt action. Legislation passed in 2016 requires state agencies to enact regulations and implement programs that will result in a statewide reduction in greenhouse gas emissions to 40 percent below 1990 levels by 2 United Nations, UN News Global Perspective Human Stories, 2021 joins top 7 warmest years on record: WMO, January 19, 2022,
https://news.un.org/en/story/2022/01/1110022#:~:text=The%20warmest%20seven%20years%20have,to%20record %20global%20average%20warming.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
61 2030. Unfortunately, a recent report has found that while the state’s greenhouse gas emissions dropped 1.6 percent between 2018 and 2019—the second largest percentage decrease since 2010— this is far short of what is needed to reach the mandated reduction by 2030.3 California must now sustain a 4.3 percent annual decrease through 2030—a reduction that is more than 2.5 times greater than was achieved in 2019.4
Marin County’s leaders and residents are well aware that climate change is poised to impact future life in the county. The county and its eleven municipalities have each developed climate action plans to address how local governments and residents can contribute to greenhouse gas emission reductions.5 These plans identify the major sources of emissions throughout the county, quantify those emissions, and recommend actions to be taken by individual jurisdictions to curb emissions and reach statewide emissions targets as well as targets enumerated in the individual plans. Although all jurisdictions reached their 2020 goals of reducing greenhouse gas emissions below 2005 levels by at least 15 percent, there is much more to be done if they are to reach the 2030 reduction targets mandated by state law.6
Figure 1 - California Greenhouse Gas Emissions by Sector (1990-2015) and Targets Through 2050 (million tons CO2 equivalent)
Credit: California Air Resources Control Board
Figure 1 shows the dramatic reduction in GHG emissions required for the state to reach its goal of reducing emissions to at least 40% below 1990 levels by 2030. 3 California Green Innovation Index, 13th Edition, 2021, https://greeninnovationindex.org/2021-edition/. 4 California Green Innovation Index.
5 County of Marin, Community Development Agency and Sustainability Team, Marin County Unincorporated Climate Action Plan, December 2020, https://www.marincounty.org/- /media/files/departments/cd/planning/sustainability/climate-and-adaptation/cap-2030_12082020final.pdf. The Climate Action Plans for each of the municipalities in Marin are https://marinclimate.org/climate-action-plans/. 6 See Marin Climate and Energy Partnership (MCEP) website, Marin Sustainability Tracker, http://www.marintracker.org/. This is an interactive mapping tool that provides statistics on the greenhouse gas emissions in various jurisdictions.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
62 Buildings Are a Significant Source of Greenhouse Gas Emissions Building electrification will be a critical component for the county to reach future emissions goals. Natural gas, a major source of greenhouse gas emissions, provides an estimated 70 percent of the energy used in the average California home.7 Building emissions are generated in the production and use of electricity and natural gas for heating, cooling, lighting, and running appliances in residential, commercial, municipal, and industrial buildings.8In Marin the largest source of greenhouse gas emissions is the transportation sector (51 percent). The county’s next largest greenhouse gas source is the building sector, which is responsible for 34 percent of total emissions.9 Of the 34 percent greenhouse gas emissions associated with Marin’s building sector, natural gas uses comprise 27 percent of the total, with the remaining 7 percent attributed to the use of electricity generated by coal or gas-fired power plants.10 Marin County’s building sector primarily consists of residential buildings, with single-family homes comprising the majority of building types in the county. Among the housing stock, 69 percent are single-family homes, followed by multi-unit dwellings at 29.5 percent, and mobile homes at 1.5 percent.11Most of the county’s natural gas usage results from the residential sector.12 Thus, removing natural gas usage from the building sector will have a major impact in reducing overall greenhouse gas emissions in the county. 7 New Buildings Institute, Building Electrification Technology Roadmap, January 12, 2021, p. 3, https://newbuildings.org/resource/building-electrification-technologyroadmap/#:~:text=The%20Building%20Electrification%20Technology%20Roadmap,emissions%2C%20and%20im prove%20public%20health.
8 The different plans have slightly different categories names to identify this sector, i.e., some refer to it as Residential Energy, Built Environment – Electricity/Natural Gas, Energy Efficiency Buildings, etc. and may or may not include the source of the energy used (County Plan says 72% decrease in Build Env- Electricity from 2005 to 2018 due to cleaner sources of energy used).
9 See MCEP website, Marin County Emissions by Sector, 2019, https://marinclimate.org/greenhouse-gasinventories/. 10 MCEP website, Marin County Emissions by Sector.
11 Marin County Housing Element 2015 – 2023 Adopted by the Marin County Board of Supervisors December 9, 2014; See also CountyOffice.org, Building Departments in Marin County, California, https://www.countyoffice.org/ca-marin-county-building-departments/ 12 In 2005, 72% of natural gas usage was in the residential sector, Marin Community Development Agency’s 2007 Marin Countywide Plan at 3.6-4.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
63 Figure 2 - Marin County’s 2019 Greenhouse Gas Emission by Sector Credit: Marin County, Community Development Agency and City of San Rafael, Marin County Green Building Code 2022 Code Cycle Update, February 18, 2022.
Unfortunately, the consumption of natural gas in homes and buildings in California is on the rise—up 15.3 percent in the commercial sector and 17.8 percent in housing since 2014, and up
19.8 percent in the industrial sector since 2009.13 Statewide, natural gas usage by buildings is significant, with buildings using more gas overall than the state’s power plants.14 These building-related uses of natural gas not only result in greenhouse gas emissions as the fuel is burned, but they are also responsible for additional emissions from the extraction and transportation of gas to end users. Emissions from the drilling of natural gas include methane, nitrogen oxides, and sulfur oxides.15 Methane is among the most worrisome greenhouse gasses as it traps heat more efficiently than carbon dioxide. It is estimated that 13 million tons of methane leak each year during gas extraction, processing, and transportation.16 About 90 percent of the gas consumed in California is drilled out of state, which creates significant opportunities for greenhouse gas emissions to occur through leaking and venting in pipeline transmission in addition to those created during combustion.17
Converting from natural gas to electricity is an effective way to significantly reduce greenhouse gas emissions. It should be noted, however, that some emissions also occur in the generation of 13 California Green Innovation Index, https://greeninnovationindex.org/2021-edition/ 14 Sierra Club, Building Electrification Action Plan for Climate Leaders, December 2019, p. ES-1, https://www.sierraclub.org/sites/www.sierraclub.org/files/Building%20Electrification%20Action%20Plan%20for% 20Climate%20Leaders.pdf
15 New Buildings Institute, Building Electrification Technology Roadmap, p.4. 16 Jeff Turrentine, The Natural Gas Industry Has a Methane Problem, Natural Resources Defense Council website, June 7, 2019, https://www.nrdc.org/onearth/natural-gas-industry-has-methane-problem. 17 Sierra Club, Building Electrification Action Plan for Leaders, p. ES-1. See also City of Berkeley, Existing Buildings Electrification Strategy, Administrative Draft, April 2021, pp. 13-14, https://www.cityofberkeley.info/uploadedFiles/Planning_and_Development/Level_3_- _Energy_and_Sustainable_Development/Draft_Berkeley_Existing_Bldg_Electrification_Strategy_20210415.pdf and New Buildings Institute, Building Electrification Technology Roadmap, p. 3.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
64 electricity, though at much reduced levels. Pacific Gas and Electric (PG&E) and the community choice aggregator, Marin Clean Energy (MCE), are Marin County’s two utility providers.18 PG&E’s electricity is generated from a blend of power sources that is presently 85 percent greenhouse gas emission free. That percentage should increase in the coming decade due to state mandates.19 MCE customers can currently opt for an arrangement furnishing electricity that is 100 percent generated by wind and solar.20
Reducing the Health and Safety Risks Posed by Gas Appliances In addition to adding greenhouse gas emissions to the atmosphere, natural gas appliances create a significant amount of indoor air pollution.21 Most residential gas appliances lack any pollution controls and can produce very high nitrogen oxide emissions.22 In particular, gas stoves emit nitrogen oxides, carbon monoxide, and formaldehyde as well as fine particulate matter in amounts greater than electric stoves.23 The peak levels of air pollution, particularly nitrogen dioxide, generated by natural gas cooktop usage can exceed outdoor air quality standards.24 Other natural gas appliances such as heating systems and water heaters also contribute to indoor air pollution and can present significant indoor air quality impacts. Like stoves, natural gaspowered furnaces and hot water tanks also emit nitrogen dioxide, nitric oxide, sulfur oxides, particulate matter, carbon monoxide, and formaldehyde.25 The U.S. Environmental Protection Agency has determined that long-term exposure to nitrogen dioxide is linked to the development of asthma in children, and short term exposure can trigger or exacerbate asthma attacks.26 Children are particularly sensitive to the pollutants generated by gas appliances. Studies have indicated that children in homes with gas appliances are 42 percent more likely to develop asthma symptoms and 32 percent more likely to be diagnosed with asthma during their lifetime.27 Lower-income households bear greater health risks since many of the factors associated with poor indoor air quality – smaller square footage, older appliances, poorer ventilation, high density of household members – create conditions that contribute to poor indoor air quality.28
The use of natural gas as a fuel in buildings also brings safety risks posed by pipeline leaks and ruptures. The potential for earthquakes, aging gas lines, and the volatile nature of natural gas are 18 Community Choice Aggregation (CCA) is an alternative to the investor owned utility in which local entities aggregate the buying power of individual customers within a defined jurisdiction in order to secure alternative energy supply contracts.
19 See California Public Utilities Code §454.53, which mandates that by 2045 all retail electricity sold in the state be generated from renewable and zero-carbon resources .https://leginfo.legislatCalifornia Code, Public Utilities Code - PUC § 454.53 | FindLawure.ca.gov/faces/billTextClient.xhtml?bill_id=201720180SB100 20 Marin Clean Energy website, https://www.mcecleanenergy.org/100-renewable/. 21 Sierra Club, Building Electrification Action Plan for Leaders, at p. ES-1. 22 Sierra Club, Building Electrification Action Plan for Leaders, at p. ES-1. 23 Brady Seals and Andee Krasner, Health Effects from Gas Stove Pollution, Rocky Mountain Institute, Physicians for Social Responsibility, Mothers Out Front, and Sierra Club, 2020, p.8 https://rmi.org/insight/gas-stoves-pollutionhealth 24 Seals and Krasner, Health Effects from Gas Stove Pollution at p. 9. 25 City of Berkeley, Existing Buildings Electrification Strategy Administrative Draft April 2021, p. 6, https://www.cityofberkeley.info/uploadedFiles/Planning_and_Development/Level_3_- _Energy_and_Sustainable_Development/Draft_Berkeley_Existing_Bldg_Electrification_Strategy_20210415.pdf. 26 Seals and Krasner, Health Effects from Gas Stove Pollution at pp. 12-13; See also City of Berkeley, Existing Buildings Electrification Strategy at p. 7.
27 Seals and Krasner, Health Effects from Gas Stove Pollution at p. 13. 28 Seals and Krasner, Health Effects from Gas Stove Pollution at p. 13.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
65 all risk factors. The catastrophic 2010 San Bruno and 2019 San Francisco gas pipeline explosions exemplify the risks of natural gas lines in buildings.29
DISCUSSION
Near-term Measures to Accelerate Building Electrification Banning Natural Gas Connections in New Construction
One of the most direct means of accomplishing electrification in the building sector is to ensure that newly constructed buildings are fully electric, with no natural gas connections. A shift to allelectric new construction helps accelerate greenhouse gas emission reductions in the building sector and avoids the health hazards posed by the ongoing use of natural gas in the indoor environment. All-electric buildings are also, with rare exception, cheaper to build than “dual fuel” buildings that incorporate both natural gas and electricity.30 Construction of new dual fuel buildings not only costs more, but it also creates potential inefficiencies as the use of natural gas infrastructure in these buildings is limited in coming years, leaving it underutilized or unused.
California has taken steps toward electrifying the building sector through the most recent update of its state-wide building code. Every three years, the California Energy Commission is charged with updating the state building code which, among other things, creates energy standards for new construction. The latest building code update went into effect in January 2022. It sets the stage for electrification by requiring newly constructed homes to be “electric-ready,” with dedicated 240-volt outlets and space (with plumbing for water heaters) so electric appliances can eventually replace installed gas appliances. It also requires new homes to have either electric heating or electric water heating, depending on which is the larger energy user. While these and other requirements will have a meaningful impact in paving the way for home electrification in the future, many observers had hoped for more decisive action from the state including, potentially, a statewide ban on natural gas connections in a range of newly constructed buildings. 29 City of Berkeley, Existing Buildings Electrification Strategy at p. 14; See also Michael Cabanatuan, “PG&E software issue allowed massive 2019 S.F. gas fire to burn longer, feds say,” San Francisco Chronicle, Aug. 10, 2021, https://www.sfchronicle.com/sf/article/PG-E-software-issue-allowed-massive-2019-S-F-gas-16378054.php which explains the initial blast was caused by a negligent contractor accidently excavating the line, but the lack of PG&E’s proper software to isolate valve led to a long wait time for the gas line to be shut off. 30 A recent study found incremental costs for new home construction ranged from $30,000 less to $3,000 more for an all-electric compared to a dual fuel home. See Frontier Energy, Inc. and Misti Bruceri & Associates, LLC, 2019 Energy Efficiency Ordinance Cost-Effectiveness Study: Low-Rise Residential, prepared for Pacific Gas and Electric, August 2019, pp. 15-16, https://efiling.energy.ca.gov/GetDocument.aspx?tn=234020- 6&DocumentContentId=66846
Item 2.4 Attachment 1
Item 2.4 Attachment 1
66 Figure 3 - Common Components of All-Electric Homes
Credit: Building Decarbonization Coalition
The state’s next building code update will not occur until 2025. In the near term, it will be up to local jurisdictions to decide whether to adopt more restrictive “reach codes” or take other measures banning or limiting the use of natural gas in newly constructed buildings. A reach code is a local building energy code that “reaches” beyond the state minimum requirements for energy use in building design and construction. To date, more than 50 local jurisdictions throughout California have adopted reach codes banning or limiting new natural gas infrastructure in new construction.31 Within Santa Clara and San Mateo counties, 20 cities have adopted their own building electrification reach codes, a majority of which require new buildings to be all-electric unless limited exceptions are met.32
Within Marin County, Fairfax is currently the only city to have adopted an all-electric requirement for new buildings.33 This may soon change, however, as a result of current efforts within the county to develop and disseminate a model reach code addressing electrification in 31 Matt Gough, California's Cities Lead the Way to a Gas-Free Future, July 22, 2021, https://www.sierraclub.org/articles/2021/01/californias-cities-lead-way-gas-free-future. 32 County of Santa Clara, California, Ordinance 108511
http://sccgov.iqm2.com/Citizens/Detail_LegiFile.aspx?Frame=&MeetingID=13238&MediaPosition=&ID=108511 &CssClass=
33 Town of Fairfax, Staff Report, August 4, 2021,
https://storage.googleapis.com/proudcity/fairfaxca/uploads/2021/07/Item-18-Ord-Electric.pdf. San Anselmo is currently considering adoption of a ban on natural gas connections for newly constructed buildings. See Adrian Rodriguez, “San Anselmo considers gas ban for new buildings,” Marin Independent Journal, March 18, 2022.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
67 new construction and in certain types of building renovations. It would then be up to the county and each of its municipalities to consider the proposed model code for adoption. Data collected by the county shows that only 16 percent of new building projects in unincorporated Marin voluntarily elected all-electric construction.34 The proposed reach code would require all new residential, multifamily, and commercial construction to be “all-electric.” If widely adopted, this reach code would have an immediate and pronounced impact in electrifying new building construction throughout Marin.
Renovations of Existing Residential Buildings
New building construction accounts for only a small fraction of Marin’s building stock. The bigger opportunities in electrifying Marin’s building sector lie in electrification of existing buildings. Marin’s proposed reach code would not require that existing dual fuel buildings be electrified, nor would it require replacement of natural gas appliances with electric appliances in existing homes. Rather, the code would be limited to certain residential building renovations.
Under the “flexible path” approach that is contemplated, homeowners and contractors applying for building renovation permits would be required to select from a menu of electrification and energy efficiency measures to incorporate into the renovation plan.35 Applicants could select any combination of specified measures, including the addition of electric heat pump space or water heaters, that meet or exceed a target energy score.
To date, at least one California city has enacted a reach code adopting a version of this flexible path approach. In 2021, the City of Piedmont enacted an ordinance that uses a menu of energy efficiency and heating system electrification improvements, and requires renovations on residential buildings to incorporate one item from the menu for projects over $25,000, and two items for projects over $100,000.36 In Marin, planning staffs from the county and San Rafael are in the process of drafting and refining the proposed model reach code, including determining what kinds of renovations will trigger its requirements. There are plans to engage the public through community workshops, finalize the draft model reach code, and submit it for legislative review by the fall of 2022.
With respect to new construction, the proposed reach code presents a needed, near-term end to the perpetuation of natural gas infrastructure in Marin’s building sector. With regard to renovations, the proposed code is an effective and practical, if incremental, step towards accelerating building electrification in Marin.
While the proposed model reach code presents a promising start, there are numerous important issues that remain to be addressed. What is the best way to extend electrification initiatives to homes that are not undergoing renovations and to large multi-unit residential buildings? Can enough consumers be incentivized to voluntarily replace gas-fueled appliances with electric ones? Are additional mandates needed? How can electrification programs be structured so as to consider the needs of Marin’s underserved communities and low-income residents? Is there a 34 Brian Reyes, Policy Brief: 2022 Code Cycle Green Building Ordinance Update – Strategy and Options for Requirements, prepared for the County of Marin, undated. 35 A program funded by the state’s largest utilities and conducted under the auspices of the California Public Utilities Commission (CPUC) provides guidance and resources to local jurisdictions interested in adopting this kind of approach. See CPUC Codes and Standards. website, https://explorer.localenergycodes.com/. 36 Sara Lillevand, City of Piedmont, Council Agenda Report, February 1, 2021, https://www.piedmont.ca.gov/common/pages/DisplayFile.aspx?itemId=17376920.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
68 means for addressing these questions in a coordinated, comprehensive way that will reach all of Marin’s communities?
A Countywide Planning Process Focused on Equity
The Need for Coordinated, Comprehensive, and Strategic Planning to Effectively Address Building Electrification
As shown by the ongoing effort to develop Marin’s model reach code, coordination between and among the county and its cities and towns increases the potential for achieving widespread, meaningful results in the short term. All of Marin’s local jurisdictions are facing similar challenges in electrifying their building sectors and in reaching greenhouse gas reduction targets.
Building departments will play an important role in implementing changes in building codes and permitting requirements. Uniformity will ease the burden on builders and contractors, and thus help to accelerate adoption.
Even more importantly, a countywide approach to planning will help to ensure the timely, sustained, and in depth focus that is required. Time is of the essence. As new gas infrastructure continues to be added to Marin’s buildings, and as new gas appliances are installed in Marin’s homes, electrification in these buildings is deferred for possibly a decade or more, making greenhouse gas reduction targets correspondingly more difficult to achieve.
There is also a human cost to delay. As low-income residents remain challenged by the up-front costs of electrification, the risk increases of a further divide between those who can afford to electrify and those who cannot. This results in greater exposure to potential displacement, adverse health effects, and other negative impacts to Marin’s underserved communities. A countywide planning process would help to ensure that all of Marin’s jurisdictions are actively engaged in solving these problems in the near term.
A countywide planning process will also help to ensure that adequate resources are devoted to the complex, multi-layered challenges posed by building electrification. A prior Grand Jury has described the county’s approach to climate change mitigation, which relies heavily on the respective climate action plans adopted in each individual jurisdiction.37 With few exceptions, these plans deal with broad recommendations that address a wide variety of areas. Given their breadth, and the limited resources available for developing them, climate action plans rarely take a “deep dive” into a specific issue or topic, and sometimes lack context or specificity, particularly in the area of building electrification.
A coordinated countywide planning process can provide a framework for collaboration that will maximize existing resources by leveraging research, data collection, and policy analysis. A timely example of this kind of collaboration is provided by the Marin Countywide Electric Vehicle Acceleration Plan (Countywide EV Plan). This plan was coordinated by the Marin Climate and Energy Partnership (MCEP).38 Through the coordinated efforts of staff from its 37 Marin County Civil Grand Jury, 2019-2020 Climate Change: How Will Marin Adapt?, September 11, 2020, https://www.marincounty.org/-/media/files/departments/gj/reports-responses/2019-20/climate-change--how-willmarin-adapt.pdf?la=en#. 38 MCEP is composed of representatives from all eleven cities and towns in Marin, the county, the Transportation Authority of Marin (TAM), Marin Clean Energy, the Marin General Services Authority, and the Marin Municipal Water District. MCEP’s mission is to promote collaboration between its members, share resources, and obtain funding to analyze and implement the strategies contained in each jurisdiction’s climate action plan.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
69 respective members and its own part-time sustainability coordinator, MCEP has produced a draft Countywide EV Plan that identifies guiding principles, describes relevant data and local conditions, enumerates barriers to EV adoption, and proposes specific strategies and recommended actions for overcoming those barriers. This plan can serve as a model for a similar effort aimed at producing a countywide plan for electrifying Marin’s building sector.
There are unique challenges posed by the building sector, to be sure. The scope and complexity of building electrification planning will likely require more time and greater resources than a plan focused on EV adoption. These challenges, however, have not prevented other jurisdictions from producing building electrification plans suited to their specific needs. Planners in San Jose, Berkeley, and elsewhere have recently released comprehensive building electrification plans that provide needed focus and depth, laying the groundwork for implementation of short and longterm electrification strategies within established timeframes.39 Marin County should do the same.
An in-depth planning process will require funding to ensure that sufficient staff is allocated for the project, and that any necessary outside consultants are retained. Development of the Countywide EV Plan was supported by a grant from the Transportation Authority of Marin. As an initial step, staff from the county and its municipalities should identify and pursue potential sources of grant funding from local, regional, and state entities.
At a minimum, a Marin Countywide Building Electrification Plan could identify current programs and policies, remaining challenges, and concrete actions the county and its cities and towns can take to accelerate the electrification of residential and commercial buildings throughout Marin. This plan could set a date for accomplishing the complete electrification of all buildings in Marin and establish a timeline for reaching that goal. And it could establish the necessary “guardrails” to avoid unintended adverse impacts on Marin’s underserved communities.
While local policies and programs are critical to the success of building electrification, they cannot succeed without broader efforts to increase the capacity and reliability of the electric grid.
Power outages pose an ongoing challenge, especially for underserved communities that may lack the resources to buy generators and otherwise mitigate the cost and inconvenience of short-term power loss. With increasing electrification of homes and the growth of electric vehicles, the state’s utilities will need to expand clean power generation and distribution infrastructure. These utilities, in conjunction with state regulatory agencies, must ensure that electricity is available to meet increased demand, especially during peak usage periods.
The Importance of Equity
An initial challenge for planners will be to ensure that equity issues are considered from the outset and are adequately reflected in resulting policies and programs. Underserved communities, often largely composed of renters, have in many cases been left out of California’s 39 City of Berkeley, Existing Building Electrification Strategy, https://www.cityofberkeley.info/uploadedFiles/Planning_and_Development/Level_3_- _Energy_and_Sustainable_Development/Draft_Berkeley_Existing_Bldg_Electrification_Strategy_20210415.pdf See also City of San José Department of Environmental Services, Healthy Homes, Healthy Air - A Framework for Existing Building Electrification Centered on Community Priorities, February 22, 2022, https://www.sanjoseca.gov/home/showpublisheddocument/82395/637811379809170000.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
70 push toward electrification.40 Low-income households often have a high energy burden – meaning a disproportionate amount of household income goes toward energy expenses. In Marin County, about 50 percent of renters are housing cost burdened, meaning they spend more than 30 percent of their income on rent. Contributing to this burden is the fact that low-income housing tends to be older and less energy efficient. Research has shown that African-American, Latino, and low-income households tend to pay more for electricity and natural gas service per square foot of building space.41 These households have greater vulnerability to rising energy costs and are less able to mitigate the impact of rising costs through measures that require significant upfront investment, such as installing solar panels and batteries or replacing outdated gas appliances with cleaner, more efficient electric appliances. Beyond these financial burdens, underserved communities must also contend with the added health risks posed by poor indoor air quality.
If building electrification strategies are to succeed, they must not increase the burden on Marin’s underserved communities. Rather, they must ensure that these communities have full access to building electrification’s principal benefits: cleaner air, healthier homes, affordable clean energy, and energy efficiency resulting in reduced monthly energy bills. This can be accomplished in part by promoting and advocating for expansion of such programs as MCE’s pilot program for Low-Income Families and Tenants which offers subsidies of $1,200 per unit to fund acquisition of appliances and energy efficiency improvements for up to 1,400 affordable multifamily units.42 Countywide planners should identify and prioritize the critical needs of underserved communities and identify priority solutions that can be addressed through building electrification. They can design a broad community engagement strategy to ensure the countywide plan reflects a diverse set of community voices and concerns. Through such an approach, the countywide plan can more effectively address communities who in the past may have been excluded from the full benefits of clean energy.
Electrification Strategies for Existing Buildings
A ban on natural gas infrastructure in newly constructed buildings is important. But in order to reach its greenhouse gas emission reduction targets, Marin must develop effective strategies for the electrification of existing dual fuel buildings, which comprise the overwhelming majority of Marin’s building stock. Marin’s proposed reach code addressing certain residential renovations presents a meaningful step forward. But it is not enough. As a next step, Marin’s planners should evaluate a full range of potential electrification initiatives for existing buildings, a number of which are being considered and implemented by other local jurisdictions. In the sections below, 40 We use the term “underserved communities” to refer to communities where residents are: predominantly people of color; living on low incomes; underrepresented in the policy setting or decision-making process; subject to disproportionate impact from one or more environmental hazards; and likely to experience disparate implementation of environmental regulations and socioeconomic investments. 41 Ariel Drehobl and Lauren Ross, Lifting the High Energy Burden in America’s Largest Cities:
How Energy Efficiency Can Improve Low Income and Underserved Communities, April 2016, https://assets.ctfassets.net/ntcn17ss1ow9/1UEmqh5l59cFaHMqVwHqMy/1ee1833cbf370839dbbdf6989ef8b8b4/Lif ting_the_High_Energy_Burden_0.pdf.
42 MCE press release (Nov 3, 2017), MCE Launches Pilot Program for Low-Income Families and Tenants https://www.mcecleanenergy.org/press-releases/lift2/#:~:text=The%20LIFT%20program%20will%20build,in%20rebates%20for%20affordable%20properties.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
71 the Grand Jury identifies some of the issues, initiatives, and programs that should be considered as part of a countywide planning process.
Consumer Choice, Incentives, and Rebates
Ideally, the transition needed to electrify Marin’s households can be accomplished in the near term, as consumers make the choice to replace old gas-fueled appliances that have reached the end of their useful lives with clean, efficient electric appliances. Local governments can play a critical role in supporting this shift through programs educating consumers about the advantages of electrification, and by providing financial incentives and subsidies as added inducements.
A countywide building electrification plan could be used to develop coordinated strategies aimed at public outreach and education. These strategies could go beyond past and current efforts by the county, and more fully engage each of Marin’s cities and towns in coordinated outreach and marketing campaigns. Among other things, these outreach efforts would seek to educate consumers about the importance of household electrification in reducing greenhouse gas emissions and reducing the health and safety risks of indoor natural gas use. They would acquaint consumers with the electric appliances needed to electrify their household and the advantages offered by each of them, and provide information about the upfront costs of acquiring and installing these electric appliances, as well as the potential ongoing cost savings resulting from more efficient electric appliances. They would also direct consumers to available incentives offered by local utilities and by local and state government agencies, including enhanced subsidies and rebates available to lower income households. Importantly, they would also inform consumers about additional financing assistance available to lower income households in the form of low interest loans and other financing options.
Through its “Electrify Marin” program, the county currently offers rebates to single family property owners for the replacement of natural gas appliances with electric ones, including water heaters, furnaces, cooktops, as well as upgrading electric service panels, where needed.43 This program, launched in January 2019 and funded by a grant from the Bay Area Air Quality Management District, achieved modest success in its initial two year phase, paying out $152,750 in rebates for 129 appliance upgrades.44 In recent months, there has been an uptick in activity, possibly associated with easing of pandemic restrictions, bringing the total to over 400 appliance upgrades. Earlier this year, the county’s board of supervisors approved the decision to infuse the program with $447,000 in additional funds received through the American Rescue Plan Act.45 While Electrify Marin remains a vital program, its scope is limited. It remains unclear that these incentives will suffice in prompting the participation required to advance widespread electrification throughout the county.
In addition to the county’s Electrify Marin rebate program, other subsidies are available to homeowners as well as owners of multi-unit residential buildings. These include:
43 County of Marin, Electrify Marin - Natural Gas Appliance Replacement Rebate Program website, https://www.marincounty.org/depts/cd/divisions/sustainability/electrify. 44 County of Marin website, Local Government Programs and Policies for Existing Building Decarbonization (January 2021) https://www.marincounty.org/-/media/files/departments/cd/planning/sustainability/electrifymarin/531-lessons-learned-report.pdf?la=en. 45 Richard Halstead, “Marin to spend $4M in pandemic aid on climate projects,” Marin Independent Journal, December20 2021, https://www.marinij.com/2021/12/20/marin-to-spend-4m-in-pandemic-aid-on-climate-projects/.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
72 ■ Bay Area Regional Energy Network - rebates and incentives for heat pump water heaters and panel upgrades46
■ TECH Clean California - incentives for heat pump systems, heat pump water heaters47 ■ Marin Clean Energy - rebates for heat pump water heaters, solar, and battery storage48 ■ PG&E - rebates for heat pump water heaters, battery storage.49 In addition to rebates and incentives, acquisition and installation of electric appliances may also be supported by a variety of financing options that offer advantages over market-rate financing.
Taken together, these incentive and financing programs furnish a critical boost to building electrification by raising consumer awareness and lowering financial barriers to adoption. They also advance equity to the extent that enhanced incentives and adequate financing options are available to low-income residents.
If sufficient resources are directed to rebate and financing programs, they could fulfill a role similar to the incentives and tax credits that have proven so effective in accelerating electric vehicle adoption in Marin and elsewhere. But unless and until those resources become available, the pace of electrification for existing buildings remains uncertain, and may fall well short of the level needed to reach emission reduction goals. Consequently, mandates may be needed as an additional means of ensuring these goals are met.
Mandating The Switch to Electric Appliances at the Time of Replacement Marin’s proposed model reach code would apply to a small subset of existing buildings – residences that are being renovated. In contrast, the county’s most recent Climate Action Plan refers to a much more sweeping mandate, potentially reaching all dual fuel single family residences in Marin. The Climate Action Plan states that the county will “[c]onsider adopting an ordinance in 2024, effective January 1, 2025, that requires homeowners to replace natural gas appliances, such as hot water heaters, stoves, cooktops, and clothes dryers, with high-efficiency electric appliances at time of replacement where feasible.”50 Larkspur has a similar statement in its Climate Action Plan. Fairfax’s Climate Action Plan also states that it will “[a]dopt an ordinance that phases in requirements to replace natural gas appliances and equipment with electric appliances and equipment at time of replacement.” 46 Bay Area Regional Energy Network (BayREN) website, which allows users to navigate to appliance specific rebates, https://www.bayren.org/rebates-financing.
47 TECH Clean California Incentives website, https://energy-solution.com/tech-incentives/. 48 MCE website, https://www.mcecleanenergy.org/?s=rebates, which explains various categories of rebates available.
49 Pacific Gas and Electric (PG&E) website, https://www.pge.com/en_US/search/searchresults.page?%26query=waterheater,which explains various rebates available for water heaters. 50 County of Marin, Marin County Climate Action Plan 2030, p. 29 https://www.marincounty.org/- /media/files/departments/cd/planning/sustainability/climate-and-adaptation/cap-2030_12082020final.pdf Item 2.4 Attachment 1
Item 2.4 Attachment 1
73 By mandating a transition to electric
appliances, a time-of-replacement
ordinance could be instrumental in
advancing the county’s greenhouse gas
reduction goals. The county’s proposed
2024 timetable leaves ample time for a
thorough assessment of such an ordinance
as part of a broader building
electrification planning process.
One potential drawback of the proposed
replacement ordinance lies in the financial
burden that could result from the up-front
costs required to purchase and install
electric appliances. Because the ordinance
applies only when the household has
decided to replace an existing
(presumably outdated or nonfunctioning)
appliance, the burden would include any
difference in cost between a new gas
appliance and its (new) electric counterpart. This burden can be reduced through rebates and incentives, including enhanced rebates aimed at lower-income households. The County’s Climate Action Plan acknowledges this by noting the need to “[e]valuate the financial impact on households at different income levels and consider offering rebates or subsidies, in partnership with electricity providers if available, for disproportionately impacted households.”51 Existing rebate programs, including Electrify Marin, could provide greater focus on equity by directing additional dollars to needs-based rebates. If electrification of appliances is mandated by ordinance, rebates would be less important in incentivizing consumer choice, and more important in subsidizing the transition for those with greater financial need.52 Rebate programs could be expanded or restructured accordingly.
Other issues that should be addressed in developing a time-of-replacement ordinance include:
■ Identification of a pool of qualified contractors who can help guide consumer choice and install electric appliances economically and effectively ■ Identifying effective enforcement mechanisms, including ways to minimize permit avoidance
■ Creative ways to minimize upfront costs, including bulk buying of electric appliances which could be resold to consumers at discounted prices. 51 County of Marin, Marin County Climate Action Plan 2030, p. 29. 52 Incentivizing consumer choice would remain important for those households that are not subject to the proposed ordinance, for example, renters in multi-unit apartment buildings.
HVAC – Heating, Ventilation, and Air Conditioning
(HVAC). Heat pump technology, which transfers heat
rather than generating it, provide a particularly efficient alternative to gas space heating. Air-source heat pumps are a significant portion of the cost of electrification but can provide two systems in one – both heating and cooling.
Water Heating – Heat pump water heaters transfer heat
from the indoor or outdoor air into a storage tank to heat water.
Cooking – Induction stoves use electricity to directly heat pots and pans through a magnetic current rather than a
direct heat source.
Dryers – Some clothes dryers are currently fueled by
natural gas. Heat pump and electric resistance clothes
dryers are an efficient alternative.
Electric Panels – Electric panel upgrades may be
necessary in many buildings to support sufficient capacity for all-electric equipment. This can add significant costs to electrification retrofits.
Credit: City of San Jose
Item 2.4 Attachment 1
Item 2.4 Attachment 1
74 Electrifying Multi-Unit Residential Buildings
Approximately 38 percent of current housing in Marin is renter-occupied, mostly in multi-unit buildings.53 This segment of the housing market poses the difficult challenge of “split incentives,” which refers to the differing interests of landlords and tenants in addressing energy upgrades. Tenants, who typically pay utilities, benefit from lower energy costs. But landlords typically shoulder the capital costs of energy-related upgrades. Planners thus face the challenge of incentivizing building owners to make these improvements, even though they are not the primary beneficiaries of lower energy costs.
There are many strategies that would help to encourage landlords to undertake electrification related upgrades. For instance, expanding or increasing rebate programs that address multi-unit residential buildings could increase the number of appliances replaced. While Electrify Marin is available only to owners of single family properties, rebates for electrification of multi-unit buildings are available from other sources, including MCE and the Bay Area Regional Energy Network.54 Owners of multi-unit buildings can use these rebates to lower their upfront costs, install new electric appliances, and benefit from the enhanced market appeal of clean, all-electric units with lower health risks and the potential for lower monthly energy bills for tenants.
Publicizing and/or increasing the rebates for larger properties would encourage more participation.
Another strategy to increase electrification for rental properties would be requiring time of use replacement for multi-unit buildings. The proposed reach code requiring electrification at time of replacement, as currently described in Marin County’s Climate Action Plan, would apply only to single-family homes. Expanding it to reach multi-unit residential buildings would significantly broaden its impact. Such an expansion would have to take into account the financial burden on building owners, and should be considered in the context of other measures to ease this burden (such as access to adequate rebates and other incentives) Finally, as discussed in more detail below, planners should consider implementing benchmarking and performance standards (i.e., a minimum energy efficiency standard) for large residential complexes. This would be an opportunity to incentivize electrification and/or other efficiency measures, possibly using a “flexible path” approach similar to that contemplated by Marin’s proposed reach code for residential renovations.
Using Building Performance Standards to Electrify Existing Buildings For buildings that consume large amounts of energy, such as large multi-unit residential or commercial buildings, the use of building performance standards can be a practical, measurable, and effective means of reducing greenhouse gas emissions. Using this approach, greenhouse gas emissions standards, based on the size and function of the building, are established, and then enforced through audits and fees.
The US Environmental Protection Agency uses the term “benchmarking” to describe the measurement of a building’s energy usage as compared with similar-sized buildings to track 53 Caroline Peattie and Lucie Hollingsworth, “Marin Voice: Housing element can advance racial, economic equity,” Marin Independent Journal, March 17, 2022, https://www.marinij.com/2022/03/17/marin-voice-housing-elementcan-advance-racial-economic-equity/. 54 BAYREN “Multifamily Property Owners,” https://www.bayren.org/rebates-financing/multifamily-propertyowners Item 2.4 Attachment 1
Item 2.4 Attachment 1
75 energy consumption over time, and the agency has developed a widely used tool to track energy usage.55 The State, as well as several jurisdictions around the Bay Area, currently require benchmarking for large buildings. In particular, the California Energy Commission has promulgated a statewide regulation that requires owners of all buildings over 50,000 square feet to annually report energy usage, and several jurisdictions in the region have adopted benchmarking ordinances based on size or building classification, though they vary in their requirements.56 Elsewhere in the country, a handful of large cities, including New York, Washington, DC, and St. Louis, have developed and begun to implement building performance standards.
Table 1 - Bay Area Jurisdictions Requiring Annual Benchmarking Jurisdiction
Square
Footage
Threshold
Building Use
San Francisco 50,000
10,000
Residential
Commercial or Industrial
Brisbane 10,000 Any class of privately owned building
Berkeley 25,000 Any class of privately owned building
San Jose 50,000
10,000
Residential
Commercial or Industrial
Credit: California Energy Commission
Although no jurisdictions in the Bay Area have yet implemented ordinances requiring building owners to meet specific energy consumption targets, the jurisdictions in Table 1 all anticipate using benchmarking data to develop enforceable building performance standards in the future. In the meantime, San Jose and Berkeley have voluntary programs that challenge owners to decrease greenhouse gas emissions each year or complete other energy efficiency related activities. Many of the climate action plans in Marin state they will consider developing building performance standards for existing buildings, though no jurisdiction has set any benchmarking requirements beyond those set by the California Energy Commission. The development of performance standards will require assessment of complex issues such as appropriate building size or usage exemptions, financing support, how compliance will be demonstrated, as well as equity and gentrification concerns among other issues. The collection of energy use data could assist with developing performance standards in the future.
55 ENERGY STAR Portfolio Manager Portfolio Manager website, https://www.energystar.gov/buildings/benchmark.
56 California Energy Commission, Building Energy Benchmarking Program website, https://www.energy.ca.gov/programs-and-topics/programs/building-energy-benchmarking-program/exempted-localbenchmarking.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
76 FINDINGS
F1. With the building sector accounting for approximately 34 percent of greenhouse gas emissions in Marin County, it will be necessary to substantially reduce emissions from that sector if the county and its cities and towns are to meet their 2030 greenhouse gas reduction goals.
F2. Reducing or eliminating natural gas as a fuel source in buildings will dramatically reduce greenhouse gas emissions from Marin County’s building sector.
F3. The use of natural gas in buildings gives rise to health and safety risks, including adverse health effects attributed to exposure to natural gas, and safety risks posed by pipeline leaks, ruptures, and explosions. These health and safety risks serve as additional reasons to eliminate natural gas as a fuel source in new and existing buildings.
F4. The timely reduction of greenhouse gas emissions from Marin County’s building sector will require in-depth, comprehensive, and coordinated planning. A countywide planning process, coordinated by Marin Climate and Energy Partnership or the county’s Sustainability Team, would be an effective and efficient means of sustaining focus and leveraging the resources needed for developing a Countywide Building Electrification Plan.
F5. Underserved communities and lower income households have greater vulnerability to rising energy costs and will likely require extra financial support to mitigate those costs and reduce household greenhouse gas emissions through measures that require significant up-front investment.
F6. The timely electrification of existing buildings will likely require one or more mandatory measures, supported where necessary by financial subsidies and rebates.
RECOMMENDATIONS
R1. On or before January 1, 2023, Marin County and each of its cities and towns that have not already done so should adopt a reach code banning natural gas connections in newly constructed buildings.
R2. On or before January 1, 2023, Marin County and each of its cities and towns that have not already done so should adopt a reach code requiring energy efficiency measures in connection with renovations of existing residential buildings. The reach code should specify the size of the renovation that will trigger the requirement and provide flexibility by allowing the applicant to choose from a list of energy efficiency measures, including electrification of gas appliances.
R3. Marin County and each of its cities and towns, collaborating through the Marin Climate and Energy Partnership or otherwise, should develop a comprehensive Countywide Building Electrification Plan to be completed on or before January 1, 2024. The Plan should identify those strategies, programs, and concrete actions necessary to bring about an equitable, prompt, and material acceleration of building electrification throughout the county.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
77 REQUEST FOR RESPONSES
Pursuant to Penal code section 933.05, the grand jury requests responses as follows:
From the following governing bodies:
■ City of Belvedere (F1–F6, R1- R3)
■ City of Larkspur (F1–F6, R1- R3)
■ City of Mill Valley (F1–F6, R1- R3)
■ City of Novato (F1–F6, R1- R3)
■ City of San Rafael (F1–F6, R1- R3)
■ City of Sausalito (F1–F6, R1- R3)
■ Marin County Board of Supervisors (F1–F6, R1-R3)
■ Town of Corte Madera (F1–F6, R1- R3)
■ Town of Fairfax (F1–F6, R2- R3)
■ Town of Ross (F1–F6, R1- R3)
■ Town of San Anselmo (F1–F6, R1- R3)
■ Town of Tiburon (F1–F6, R1- R3)
The governing bodies indicated above should be aware that the comment or response of the governing body must be conducted in accordance with Penal Code section 933 (c) and subject to the notice, agenda, and open meeting requirements of the Brown Act.
Note: At the time this report was prepared information was available at the websites listed.
Reports issued by the Civil Grand Jury do not identify individuals interviewed. Penal Code Section 929 requires that reports of the Grand Jury not contain the name of any person or facts leading to the identity of any person who provides information to the Civil Grand Jury. The California State Legislature has stated that it intends the provisions of Penal Code Section 929 prohibiting disclosure of witness identities to encourage full candor in testimony in Grand Jury investigations by protecting the privacy and confidentiality of those who participate in any Civil Grand Jury investigation.
Item 2.4 Attachment 1
Item 2.4 Attachment 1
78 Response to Grand Jury Report
Report Title: Electrifying Marin’s Buildings: A Countywide Approach Respondent/Agency Name: San Anselmo Town Council
FINDINGS
▪ I (we) agree with the findings numbered: F1-F6
▪ I (we) disagree partially with the findings numbered: N/A ▪ I (we) disagree wholly with the findings numbered: N/A (Attach a statement specifying any portions of the findings that are disputed; include an explanation of the reasons therefor.)
RECOMMENDATIONS
▪ Recommendations numbered R1 have been implemented. (Attach a summary describing the implemented actions.)
▪ Recommendations numbered R2 have not yet been implemented, but may be implemented in the future.
(Attach a timeframe for the implementation.)
▪ Recommendations numbered R3 require further analysis. (Attach an explanation and the scope and parameters of an analysis or study, and a timeframe for the matter to be prepared for discussion by the officer or director of the agency or department being investigated or reviewed, including the governing body of the public agency when applicable. This timeframe shall not exceed six months from the date of publication of the grand jury report.) ▪ Recommendations numbered will not be implemented
because they are not warranted or are not reasonable.
(Attach an explanation.)
Date: Signed:
Alexis Fineman, Mayor, Town of San Anselmo
Number of pages attached: 5
Item 2.4 Attachment 2
Item 2.4 Attachment 2
79 Town of San Anselmo
525 San Anselmo Avenue, San Anselmo, CA 94960-2682
(415) 258-4616
www.townofsananselmo.org
August 23, 2022
The Honorable Judge James Chou
Marin County Superior Court
Post Office Box 4988
San Rafael, CA 94913-4988
Deborah Haase, Foreperson
Marin County Grand Jury
3501 Civic Center Drive, Room 275
San Rafael, CA 94903
Re: Response to Grand Jury Report dated June 6, 2022, “Electrifying Marin’s Buildings: A Countywide Approach”
Dear Honorable Judge Chou and Ms. Haase:
This letter explains in detail the Town of San Anselmo’s response to the Grand Jury Report referenced above. The report directs the Town to respond to Findings F1–F6 and Recommendations R1-R3.
FINDINGS AND RESPONSES
F1. With the building sector accounting for approximately 34 percent of greenhouse gas emissions in Marin County, it will be necessary to substantially reduce emissions from that sector if the county and its cities and towns are to meet their 2030 greenhouse gas reduction goals.
Response: Agree.
Similar to the County, San Anselmo’s building sector accounts for a substantial portion of its total emissions. The latest available 2019 GHG inventory report shows that 33% of San Alexis Fineman
Mayor
Steve Burdo
Vice Mayor
Brian Colbert
Council Member
Ford Greene
Council Member
Eileen Burke
Council Member
Item 2.4 Attachment 2
Item 2.4 Attachment 2
80 Anselmo’s emissions come from natural gas use in buildings compared to 6% of its emissions from electricity use in buildings. Emissions from electricity have decreased 71% since 2005 due to the lower carbon intensity of electricity as MCE and PG&E continue to utilize more renewables in their energy mix. In contrast, emissions from natural gas use have only decreased 8% since 2005, and increased 1% between 2018 and 2019. Therefore, substantial reductions in emissions from the building sector, particularly with natural gas use, are required for San Anselmo to meet its 2030 GHG reduction goal of 54% below 2005 emissions levels.
F2. Reducing or eliminating natural gas as a fuel source in buildings will dramatically reduce greenhouse gas emissions from Marin County’s building sector.
Response: Agree.
F3. The use of natural gas in buildings gives rise to health and safety risks, including adverse health effects attributed to exposure to natural gas, and safety risks posed by pipeline leaks, ruptures, and explosions. These health and safety risks serve as additional reasons to eliminate natural gas as a fuel source in new and existing building.
Response: Agree.
F4. The timely reduction of greenhouse gas emissions from Marin County’s building sector will require in-depth, comprehensive, and coordinated planning. A countywide planning process, coordinated by Marin Climate and Energy Partnership or the county’s Sustainability Team, would be an effective and efficient means of sustaining focus and leveraging the resources needed for developing a Countywide Building Electrification Plan.
Response: Agree.
F5. Underserved communities and lower income households have greater vulnerability to rising energy costs and will likely require extra financial support to mitigate those costs and reduce household greenhouse gas emissions through measures that require significant up-front investment.
Response: Agree.
F6. The timely electrification of existing buildings will likely require one or more mandatory measures, supported where necessary by financial subsidies and rebates.
Response: Agree.
Item 2.4 Attachment 2
Item 2.4 Attachment 2
81 For San Anselmo to meet its 2030 GHG reduction goal, mandatory measures will be required to support building electrification with financial incentives provided to support this transition, particularly for low-income residents. San Anselmo has already begun this process through the adoption of Ordinance No. 1165 on June 28, 2022 that requires all newly constructed residential buildings to be all-electric starting July 28, 2022. The Town will continue to pursue such measures, as needed, to achieve its 2030 GHG reduction goal.
RECOMMENDATIONS AND RESPONSES
R1. On or before January 1, 2023, Marin County and each of its cities and towns that have not already done so should adopt a reach code banning natural gas connections in newly constructed buildings.
Response: This recommendation has been implemented.
On June 28, 2022, San Anselmo’s Town Council adopted Ordinance No. 1165, which requires newly constructed residential buildings to be all-electric, meaning that no natural gas or propane plumbing can be installed in the building. This ordinance will take effect on July 28, 2022.
Additionally, Town staff and the Town Council will consider adopting the proposed model reach code discussed in the response to Recommendation R2, which will require allelectric appliances for new construction that applies to commercial buildings as well.
R2. On or before January 1, 2023, Marin County and each of its cities and towns that have not already done so should adopt a reach code requiring energy efficiency measures in connection with renovations of existing residential buildings. The reach code should specify the size of the renovation that will trigger the requirement and provide flexibility by allowing the applicant to choose from a list of energy efficiency measures, including electrification of gas appliances.
Response: This recommendation has not yet been implemented, but may be implemented in the future.
Town staff have been participating in the Green Building Steering Committee led by the County’s Sustainability team along with other jurisdiction staff and MCE staff. The Steering Committee has been developing a model reach code since September 2021 with the goal of having all Marin jurisdictions adopt it this year, and go into effect on January 1, 2023. The model reach code will require all-electric appliances for new construction (including residential, multifamily, and commercial). In addition, for remodels of existing residential buildings, including single-family and low-rise multifamily buildings, it will require the use of a flexible measures compliance pathway tool as developed by the State.
If adopted, this performance-based pathway will facilitate projects of a certain size to meet a target energy score using a point system that allows for a flexible range of electrification and energy efficiency measures (e.g., window and wall insulation, HVAC heat pumps, heat pump water heaters).
The Steering Committee has hosted several Technical Working Group meetings with Item 2.4 Attachment 2
Item 2.4 Attachment 2
82 Marin jurisdictions’ building officials to discuss challenges/concerns associated with building electrification and how to overcome them. Members of the building community (i.e., architects, contractors) have also been invited to these meetings to provide their input along with utility representatives. To gather input from the larger Marin community, the Steering Committee hosted a virtual community workshop on June 22 that included discussions about impacts of building electrification on affordable housing, the power grid, the environment, and public health.
The next steps in this process are to draft the model reach code (to be completed by August) and then solicit feedback from jurisdiction staff, sustainability/climate action committees, and advocacy groups. After incorporating this feedback, staff from each jurisdiction would draft an ordinance based on the model reach code and then work with their respective council or board of supervisors to adopt an ordinance by the end of the year. If adopted, it would go into effect on January 1, 2023. Details on the proposed model reach code can be found at www.marincounty.org/greenbuildingcodes.
Although the Town is supportive of this process, it also reserves the right to pursue more stringent reach codes for remodels such as requiring all-electric for substantial remodels in order to ensure it achieves its 2030 GHG reduction goal while also ensuring such requirements are not overly burdensome for residents and businesses. Any updates to the Town’s building codes are also dependent on the approval of the Town Council.
R3. Marin County and each of its cities and towns, collaborating through the Marin Climate and Energy Partnership or otherwise, should develop a comprehensive Countywide Building Electrification Plan to be completed on or before January 1, 2024.
The Plan should identify those strategies, programs, and concrete actions necessary to bring about an equitable, prompt, and material acceleration of building electrification throughout the county.
Response: This recommendation requires further analysis.
Town staff currently serve as a member of the Marin Climate and Energy Partnership (MCEP). While we can only respond on behalf of the Town of San Anselmo, we are supportive of having MCEP, the County Sustainability team, or another entity lead such an effort to develop a comprehensive Countywide Building Electrification Plan to be completed on or before January 1, 2024. With new construction and remodels addressed by the County’s current model reach code development (discussed in the prior response to Recommendation R2), this Countywide Building Electrification Plan should focus on strategies, programs, and actions for electrifying the existing building stock in an equitable and timely fashion, and set a goal for complete electrification of all buildings in Marin as discussed in the Grand Jury report.
MCEP is well-positioned to develop a Countywide Building Electrification Plan as it has been working on a similar Countywide EV Acceleration Strategy that includes strategies for accelerating the adoption of EVs that can be utilized by Marin jurisdictions. The funding for this Strategy was provided by the Transportation Authority of Marin (TAM).
MCEP members could seek out sources of local, regional, and state funding for the development of a Countywide Building Electrification Plan, if needed. If agreed upon by other MCEP members, the Countywide Building Electrification Plan could be added to its FY 2022-23 initiatives.
Item 2.4 Attachment 2
Item 2.4 Attachment 2
83 Additionally, the Town will need to evaluate the best use of its staff resources to maximize progress towards its Climate Action Plan goals. If staff time is devoted to the development of a Countywide Building Electrification Plan, then other projects and programs may have to be delayed. The Town will need to consider the costs and benefits of the potential Plan relative to these other measures to determine the best course of action. Once the 2022 Green Building Code update is complete by the end of 2022, the Town will consider the most effective next steps toward building electrification and will continue our collaboration with other Marin jurisdictions.
The Town of San Anselmo Town Council reviewed and approved this response on August 23, 2022, at a duly noticed and agendized public meeting. If you have further questions on this matter, please do not hesitate to contact us.
Sincerely,
Alexis Fineman
Mayor
Item 2.4 Attachment 2
Item 2.4 Attachment 2
84 Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 2.5.
FROM:
Sean Youra, Climate Action Coordinator; Sean Condry, P.E., C.B.O., Public Works & Building Director SUBJECT:
Authorization to Sign an Agreement with Sage Energy Consulting and Request for Resilience Hub Consultant Funds
RECOMMENDATION
1. Authorize the Public Works Director to sign the Master Services Agreement and Task Orders with Sage Energy Consulting, Inc. (SAGE) for the interconnection application and feasibility study of the Municipal Resiliency Hub-Solar PV and Microgrid at Town Hall and the Library.
2. Approve the request for funding to cover SAGE’s consulting services.
BACKGROUND
At its June 11, 2019, meeting, Town Council approved Resolution 4286 to adopt the San Anselmo Climate Action Plan 2030. The Climate Action Plan (CAP) includes several measures to both reduce GHG emissions and improve community resiliency, including:
· Measure R-4: Investigate and pursue innovative technologies such as microgrids, battery storage, and demand-response programs that will improve the electric grid’s resiliency and help to balance demand and renewable energy production.
· Measure R-5: Install solar energy systems at municipal buildings and facilities where feasible and investigate and pursue innovative technologies such as battery storage and demand response programs.
· Measure A-1: Develop local systems of food and energy production to enhance our town's resiliency and adaptation toward localized systems. Examples include microgrids for energy and regenerative agriculture practices on Town managed land, as well as promoting home gardens and water catchment systems.
San Anselmo’s Climate Action Commission (CAC) recently developed their 2022-23 priority project workplans, which include developing a design for the upgrade of Town Hall to serve as San Anselmo’s Community Resilience Hub with solar PV and battery energy storage for emergency situations.
Staff and CAC members subsequently held a meeting on August 1 with Sage Energy Consulting based in San Rafael to explore developing a Resilience Hub for Town Hall and possibly the library.
DISCUSSION
Town of San Anselmo Page 1 of 3 Printed on 8/18/2022
powered by Legistar™ 85
TO: Town Council 8/23/2022 Item #: 2.5.
As defined by the Urban Sustainability Directors Network (USDN), “Resilience Hubs are community-serving facilities augmented to support residents, coordinate communication, distribute resources, and reduce carbon pollution while enhancing quality of life.” An integral part of Resilience Hubs is providing resilient power, which is the ability to provide power to essential facilities and services during a power outage while simultaneously providing economic and environmental benefits by reducing energy bills, GHG emissions, and air pollution.
Solutions to provide resilient power typically include multiple forms of power generation and energy storage, most commonly in the form of solar PV paired with battery energy storage. Further resiliency can be provided with microgrid controls that can keep critical infrastructure and electrical loads (e.g., refrigeration, air conditioning, lighting) operational during power outages by disconnecting from the main grid and utilizing renewables and energy storage to power these critical loads. In the face of worsening climate impacts including severe flooding, wildfires, and heatwaves that can also impact grid reliability, Resilience Hubs offer a critical adaptation solution to ensure communities can remain resilient before, during, and after these events.
SAGE has substantial expertise in the technical and financial aspects of installing solar PV, battery energy storage, and microgrids. They’ve worked on several renewable generation projects for public entities in the Bay Area, including the San Mateo Union High School District and Santa Clara County. This work has included performing solar analyses, feasibility studies, and financial and performance modeling; identifying and securing financing; developing and managing RFPs; and ongoing construction and asset management support for these projects.
SAGE can support the Town’s efforts to develop a Resilience Hub by first submitting an interconnection application to PG&E and conducting a feasibility study for installing solar with battery energy storage and microgrid controls on Town property to provide resiliency benefits to Town Hall and possibly the library. To submit the interconnection application, SAGE would create electrical and site drawings as part of the application packet. The estimated costs for each of these items are:
· Submittal of interconnection application: $4,500
· Conduct feasibility study: $18,700
Further details regarding the scope of work for each of these items can be found in the associated Tasks Orders (Attachments 2 and 3).
FISCAL IMPACT
The total estimated cost for the consulting services is $23,200. Funding will come from the General Fund.
Some or all of these costs may be able to be reimbursed over time if a Power Purchase Agreement (PPA) is pursued for financing later phases of the project.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The Council’s authorization to sign the agreement with SAGE and approval of the request for funding are not a “project” under the California Environmental Quality Act, because it does not involve an activity which has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub.
Res. Code § 21065).
As discussed in the Background section, the CAP includes several measures related to the Resilience Hub Town of San Anselmo Page 2 of 3 Printed on 8/18/2022
powered by Legistar™ 86
TO: Town Council 8/23/2022 Item #: 2.5.
project including Measures R-4: Innovative Technologies, R-5: Solar Energy Systems for Municipal Buildings, and A-1: Preparation and Response.
CONCLUSION
Staff respectfully requests that the Council authorize the Public Works Director to sign the agreement with SAGE and approve the request for consulting funds to initiate the Resilience Hub project.
Town of San Anselmo Page 3 of 3 Printed on 8/18/2022
powered by Legistar™ 87
MASTER SERVICES AGREEMENT
This master services agreement (“Agreement”) is made this Ninth day of August,2022 by and between Town of San Anselmo (hereinafter called “Owner” or “Client”) and Sage Energy Consulting, an NV5 Company, a California corporation with business address at 101 Lucas Valley Rd, Ste. 302, San Rafael, CA 94903 (hereinafter called the “Consultant”).
WITNESSETH
WHEREAS, Consultant is in the business of providing project management services and Owner desires to retain the project management services of Consultant for several projects.
WHEREAS, Owner desires to hire Consultant to perform services in connection with energy project evaluation and assistance (hereinafter referred to as the “Project”) as defined in Consultant’s proposal, which is incorporated into this Agreement.
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements contained herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows:
1. Term. The Term of the project is thirty six (36) months.
2. Appointment. Owner hereby appoints Consultant and Consultant hereby accepts the appointment, as an independent contractor and not as an agent, to perform services herein contemplated, in accordance with and subject to, the express terms, covenants, conditions and provisions of this Agreement.
3. Services of Consultant. This Agreement anticipates the execution of written Task Orders which set forth the services specified in Consultant’s Proposal and in each Task Order (the “Services”). Each Task Order shall define the scope of Services to be performed, the location of Consultant’s project for providing such Services, the time period for performance, the Consultant’sfees, and additional provisions, if any, applicable to such Services. The Parties agree that this Agreement, the Services, and all Task Orders, shall be governed and controlled by the terms and conditions herein With regard to this Agreement, the Services, and all Task Orders, Consultant makes no warranty, either express or implied, as to its findings, recommendations, plans, Item 2.5 Attachment 1
Item 2.5 Attachment 1
88 specifications, or professional advice except that the services were performed in a manner consistent with the level of care and skill ordinarily exercised by members of Consultant’s profession currently practicing under similar conditions and in the same locality as the project. Owner agrees that Consulant shall not be responsible for the means, methods, procedures performance, site safety of the construction contractors or subcontractors, or for their errors or omissions. This Agreement and the Services to be performed hereunder shall in no way be construed as a guarantee of deficient-free construction.
4. Scope of Authority. Consultant shall act in an advisory capacity to Owner and will not have the authority to bind Owner to any contractual obligations or otherwise incur liabilities on behalf of Owner or the existing parties. (a) Consultant shall have no liability or responsibility to Owner or any third party (i) by reason of the failure on the part of any existing party or contractor to furnish required labor, materials, supplies or services in accordance with their respective contracts, obligations or undertakings, or (ii) for any defect or omission in plans and specification for the project, or (iii) for any negligent act or omission, breach of contract, malfeasance or malpractice of any existing party or contractor on the project. No action, statements, or communications of Consultant, or Consultant’s site representative, can be construed as modifying any agreement between Owner and others. Consultant’s presence on the peoject in no way guarantees the completion or quality of the performance of the work of any party retained by Owner to provide services. The activities of Consultant, shall not be construed to impose upon Consultant any responsibility for methods of work performance, superintendence, sequencing of construction, or safety conditions at the Premisis. Owner acknowledges that Owner its general contractor is solely responsible for job site safety. Owner also agrees to make Consultant an additional insured under any general contractor’s general liability insurance policy.
(b) Consultant shall in no event be obligated or liable for the duties or responsibilities of the general contractor or design-build contractor, including but not limited to means, methods, sequencing, and safety.
(c) All contracts for labor, materials or services to be furnished in connection with the project shall be made in the name of the Owner (and, subject to compliance with the provisions hereof, shall be executed by Owner), and Owner shall be responsible for all payments required to be made hereunder.
5. Representatives. Consultant shall be entitled to rely upon any consents or approvals given by Owner or Owner’s representative.
Item 2.5 Attachment 1
Item 2.5 Attachment 1
89 6. Billing and Payment. Client shall pay Consultant in accordance with the schedule of fees or charges as shown in the Proposal or fee schedule. Backup data on billing will not be available unless prior arrangements have been made. Prior to initiation of the Services, Client is required to remit any retainer specified in the Proposal.
Thereafter, Consultant will submit to Client invoices for the balance due, which shall be due and payable immediately upon submission. If Client objects to all or any portion of any invoice, Client will so notify Consultant in writing within ten (10) calendar days of the invoice date, identify the cause of disagreement, and immediately pay that portion of the invoice not in dispute. In the absence of written notification described above, the balance as stated on the invoice shall be deemed accepted. Invoices are delinquent if payment has not been received when due. In such event, Client shall pay an additional charge of one and one-half (1.5) percent per month (or the maximum percentage allowed by law, whichever is lower) on any delinquent amount. Payment thereafter will first be applied to accrued interest and then to the principal unpaid amount. Consultant shall be entitled to recover for all costs and expenses incurred (including any attorney’s fees) in connection with collection of any delinquent amount. Consultant reserves the right to withhold all reports or deliverables and suspend any and all services, including but not limited to expert witness services such as testifying at deposition or trial, unless and until payment is made by Client in accordance with this Agreement. Fee schedules are periodically revised. Unless otherwise agreed, new rates apply to ongoing work as such rates are issued.
7. Consultant’s Costs. Owner shall reimburse Consultant for reasonable and necessary out-of-pocket incidental expenses (which may include but are not limited to supplies and equipment, telephone, telecopy, delivery and copying charges), at cost with a 10% administrative mark-up, upon Owner’s receipt of reasonable evidence that Consultant shall have incurred the same in connection with the project Specifically requested reimbursable cost, including travel will be billed at actual cost with a 10% markup.
8. Disputes. The Owner shall make no claim for professional negligence, either directly or by way of a cross complaint against the Consultant, unless the Owner has first provided the Consultant with a written certification executed by an independent consultant currently practicing in the same discipline as the Consultant and licensed where the project is located. This certification shall: (a) contain the name and license number of the certifier; (b) specify the acts or omissions that the certifier contends are not in conformance with the standard of care for a consultant performing professional services under similar circumstances; and (c) state in detail the basis for the certifier’s opinion that such acts or omissions do not conform to the standard of care. All claims, disputes, controversies or matters in question arising out of, or relating to, this Agreement or any breach thereof, including but not limited to disputes arising out of alleged design defects, breaches of contract, errors, omissions, or acts of professional Item 2.5 Attachment 1
Item 2.5 Attachment 1
90 negligence, (collectively “Disputes”) shall be submitted to mediation before and as a condition precedent to pursuing any other remedy and venue for the same shall be where the project is located. Upon written request by either party to this Agreement for mediation of any dispute, Owner and Consultant shall select a neutral mediator by mutual agreement. Such selection shall be made within ten (10) calendar days of the date of receipt by the other party of the written request for mediation. In the event of failure to reach such agreement or in any instance when the selected mediator is unable or unwilling to serve and a replacement mediator cannot be agreed upon by Owner and Consultant within ten (10) calendar days, a mediator shall be chosen as specified in the Mediation Rules of the American Arbitration Association then in effect, or any other appropriate rules upon which the parties may agree. Any cause of action brought against Consultant shall be brought within one year of the work or services performed under this Agreement. Owner hereby agrees to indemnify, defend and hold Consultant harmless against any and all actual as well as any actions, causes of action, fines, costs and claims arising out of or in any way relating to this project not the result of misconduct, gross negligence, or breach of this Agreement by Consultant.
9. Documents. Processes used and documents prepared or provided by Consultant while working for the Owner are solely provided as instruments of service to the Owner for use on the project. They are and shall remain the property of Consultant, who reserves all rights thereto.
10. Limitation of Liability. To the fullest extent permitted by law, and not withstanding any other provision of this Agreement, the total liability, in the aggregate, of Consultant, and its officers, directors, partners, employees, agents and subconsultants, and any of them, to the Owner and anyone claiming by, through or under the Owner, for any and all claims, losses, costs or damages of any nature whatsoever arising out of, resulting from or in any way related to the Project or the agreement from any cause or causes, including but not limited to the negligence, professional errors or omissions, strict liability, breach of contract or warranty, express or implied, of Consultant, and its officers, directors, employees, agents or sub-consultants, or any of them, shall not exceed the total compensation received by the Consultant, for Services provided under this Agreement or $50,000 whichever is less.
11. Default; Termination. This Agreement may be terminated without cause by either party upon thirty (30) days written notice, and at any time by either party if the other party defaults in the performance of any material provision of this Agreement and such default continues for a period of seven (7) days after written notice thereof. In the event of termination, Consultant will be paid for services performed through the date of termination, reimbursable expenses incurred plus reasonable termination expenses, including the cost of completing analyses, demobilization, records and reports necessary to document job status at the time of termination.
Item 2.5 Attachment 1
Item 2.5 Attachment 1
91 12. Notices. Except as otherwise herein expressly provided, every notice, demand, consent, request, approval or other documents or instruments required or permitted to be served upon any of the parties hereto shall be in writing and shall be deemed to have been given when delivered by messenger, by electronic facsimile transmission or by the U.S. mails (and if mailed, shall be deemed received two (2) business days after the postmarked date thereof), with the cost thereof borne by the delivering party, and addressed to the parties as follows:
To Owner: Sean Condry P.E.
Public Works and Building Director
Town of San Anselmo
525 San Anselmo Ave
San Anselmo, CA 94960
To Consultant: Sage Energy Consulting, an NV5 Company
101 Lucas Valley Rd, Suite 302
San Rafael, CA 94903
Either party may change its address for notices by delivering notice to that effect in the manner above provided.
13. Relationship between the Parties; No Restrictions. This Agreement is not intended to result in any agency, partnership, employment or joint venture between the parties hereto or limit or restrict Consultant from performing services for any other building or projects at any time and wherever located and whether the same as or similar to the services to be performed by Consultant.
14. Successors and Assigns. Neither party may assign this Agreement or any right or obligation hereunder without the prior written consent of the other party, which shall not be unreasonably withheld or delayed; provided, however, that no consent shall be necessary in the event of an assignment to a successor entity resulting from a merger, acquisition or consolidation by either party or an assignment to an Affiliate of either party if such successor or Affiliate assumes all obligations under this Agreement.
15. No Third Party Beneficiaries. The rights and obligations of the parties hereto are intended for the sole benefit for the parties hereto, and except as otherwise expressly herein provided, are not intended for the benefit of, and may not be enforced by, any third party.
Item 2.5 Attachment 1
Item 2.5 Attachment 1
92 16. Entire Agreement; Modifications. This Agreement constitutes the entire agreement between the parties hereto regarding the subject matter hereof, and supersedes all prior agreements, whether written or oral, with regard thereto. No representations, inducements, promises or agreements, oral or otherwise, between the parties not embodied herein shall be of any force or effect. No change, modification or amendment shall be made to this Agreement unless set forth in writing and signed by the parties hereto.
17. Severability. The provisions of this Agreement are severable, and should any provision be found to be invalid or unenforceable, such finding shall not affect the validity or enforceability of any other provisions hereunder.
18. Governing Law. This Agreement shall be interpreted in accordance with the laws of the state where the project is located. In the event of a lawsuit, the proper venue shall be in the county where the project is located.
19. Headings. The headings used in this Agreement are inserted only as a matter of convenience and for reference and in no way define, limit or describe the scope of this Agreement nor the intent of any provisions thereof.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written.
CLIENT CONSULTANT
Name: Name: Tom Williard
Title: Title: Vice President
Date: Date: 8/9/2022
Item 2.5 Attachment 1
Item 2.5 Attachment 1
93 This Task Order is pursuant to the Master Services Agreement (“MSA”) between Sage Renewable Energy Consulting, Inc. (“SAGE”) and Town of San Anselmo (“CLIENT”) dated August 9, 2022.
This Task Order must be mutually executed before work is commenced.
Project Contacts
SAGE Town of San Anselmo
Name: David Williard Name: Sean Condry P.E.
Title: Principal Title: Public Works and Building Director Email: [email protected] Email: [email protected] Phone: 415.663.9914 Phone: 415.258.4676
Address: 101 Lucas Valley Road, Suite 302
San Rafael, CA 94903
Address: 525 San Anselmo Ave.
San Anselmo, CA 94960
Project Overview
Net Energy Metering (NEM) in California is scheduled to transition from the current scheme called NEM 2.0 to a new scheme called NEM 3.0 in September – October 2022 for customers of the three regulated utilities: PG&E, SCE, and SDG&E. NEM 3.0 is likely to result in a significant reduction (~20 to 40%) in value of energy produced by customer solar PV systems in these utility territories.
Customers can lock in the current NEM 2.0 for 20 years for solar PV projects by submitting interconnection applications before NEM 3.0 is implemented.
Task Order NEM 2.0 Grandfathering Interconnection Application Assistance Task Order # 22041-01
Project Name NEM 2.0 Grandfathering Interconnection Application Assistance Client Town of San Anselmo
Physical Location 525 San Anselmo Ave San Anselmo CA 94960 Estimated Start Date August 1, 2022
Estimated End Date October 31, 2022
Estimated Fees Fixed Fee: $3,500
T&M NTE: $1,000
Item 2.5 Attachment 2
Item 2.5 Attachment 2
94 For the Town of San Anselmo, Sage will prepare and submit one (1) NEM interconnection application to PGE for the Town Hall + Police Station shared electrical service and manage the application process to try and ensure that the interconnection application is deemed complete by the utility prior to the NEM 2.0 deadline.
Scope of Work
Task 1 Prepare and Submit Interconnection Application
1.1 Access customer utility service account to verify meter identification information and download the most recent 12-month history of electricity consumption data.
1.2 Determine anticipated future annual electricity consumption for system sizing calculations.
1.3 Create high-level system designs sufficient for interconnection application requirements based on target system production, including system size, conceptual layout, equipment specification, and quantities.
1.4 Prepare site plans, electrical single line diagrams, and any other required interconnection application materials.
1.5 Prepare all interconnection application documents, review for accuracy and submit to CLIENT for review and execution.
1.6 Submit executed interconnection application via the utility’s web portal prior to the deadline.
1.7 Submit the initial interconnection application fee on behalf of CLIENT.
Site visits: None; all work performed remotely.
Task 2 Manage Interconnection Application
2.1 Manage coordination of any application changes required by utility and assist in the transfer of application ownership to selected solar PV contractor.
2.2 Assist with the transfer of application ownership to the solar PV developer within period of work covered by this task order.
Item 2.5 Attachment 2
Item 2.5 Attachment 2
95 Schedule and Deliverables
Task Start Date End Date Deliverables
1 Prepare and Submit
Interconnection Application
August,
2022
October,
2022
− Application materials
− Submitted interconnection application
2 Manage Application October,
2022
December,
2023
− Updated interconnection application
(if needed)
Project Requirements and Assumptions
1. Interconnection Application will be prepared for 1 CLIENT service with single utility company electrical service (NEM). Additional sites or service evaluation may increase fees.
2. All work to be performed remotely. No site visits are expected for this Task Order. If travel is required and requested by CLIENT, it will be compensated in a separate Task Order.
3. Site data will be made available as needed. SAGE will review available existing data and provide preliminary review of project constraints.
4. CLIENT staff will identify location of main utility electrical service meter and switchgear at each site, provide service ratings, and photos, if needed.
5. CLIENT will provide estimates of changes in electricity consumption at proposed sites based on energy efficiency measures, anticipated changes site usage, and new construction.
6. Sage will pay the interconnection application fee to the Utility on behalf of the CLIENT.
7. This Task Order is only for interconnection application preparation, submittal and management for the initial IA to be deemed complete. The scope does not include subsequent revisions to the IA, coordination of inspections with the Utility or permission-to-operate support. These services can be provided under a separate Task Order.
8. All work will be completed by October 31, 2022. If services are needed beyond this term, additional time & materials fees may apply.
9. SAGE will make all reasonable efforts to achieve “deemed complete” status for the applications prior to NEM 3.0 implementation. SAGE cannot guarantee NEM 2.0 grandfathering for any sites.
Fees and Payment Schedule
The total estimated Project fees listed in this section are based on preparation and management of one (1) interconnection application for the Town Hall + Police Station service at the Town of San Anselmo.
Item 2.5 Attachment 2
Item 2.5 Attachment 2
96 Task Fee Structure
SAGE is proposing services on a fixed fee per site for interconnection application and submittal, calculated based on the number of sites. Active management of interconnection applications after submittal will be provided will be billed on a time and materials (T&M) basis with a not to exceed (NTE) limit, billed at the hourly rates listed below in the Hourly Fee Table.
Hourly Fee Schedule
Updated hourly fees will be provided by Sage prior to each new calendar year. SAGE will notify CLIENT when 80% of a task’s budget has been completed and will not exceed NTE limits without consent of CLIENT.
Title 2022 2023
Principal $295 $310
Associate Principal $250 $265
Subject Matter Expert $395 $415
Senior Project Manager $245 $260
Project Manager $215 $225
Senior Engineer/Data Scientist $215 $225
Construction Manager $200 $210
Engineer/Data Scientist $185 $195
Senior Analyst/Technician $185 $195
Analyst/Technician $155 $160
Program Support Specialist $115 $120
Energy Intern $115 $120
Project Administrator $90 $95
Task Fixed Fee T&M NTE
1 Prepare and Submit Three Interconnection Applications $3,500 - 2 Manage Interconnection Application - $1,000
Totals $3,500 $1,000
Item 2.5 Attachment 2
Item 2.5 Attachment 2
97 Term of Fee Schedule
The Fee Schedule above is for project work completed through December 31, 2024.
Billing and Payment Terms
SAGE invoices monthly with terms of Net 30.
If schedule is extended as a result of CLIENT, regulatory, or Developer or other contractor/vendor actions or inactions, SAGE will consult with CLIENT on utilizing contingency funds or extending the budget as needed.
Based on the CLIENT preference, and findings from the feasibility study and RFP process; the project may be financed through a PPA agreement with a third-party developer, owner, and operator. The PPA contract will require the PPA Vendor to reimburse CLIENT for SAGE’s fees per the Project Development Costs schedule that will be included in the RFP and PPA contract. SAGE’s fees will be included in the project financing and reflected in the PPA electricity costs.
Reimbursable Expenses
Fees assume all deliverable materials for the project will be provided digitally. Printed copies of documents will be billed at cost plus 10%. For time and materials fee structure projects, all reasonable and ordinary expenses are reimbursable at cost plus 10%.
Travel Costs
When air travel is required, coach class airfare will be used for domestic air travel and business class airfare will be used for international travel. Personnel travel time from our office to project location is billable at the full hourly rate. Meals and lodging will be billed at cost. Vehicle driving mileage will be billed at the current IRS mileage rate.
Subconsultant Fees
Subconsultant fees will be passed through at cost plus 15%.
Item 2.5 Attachment 2
Item 2.5 Attachment 2
98 IN WITNESS WHEREOF, authorized representatives of both SAGE and CLIENT have executed this agreement as of the date set forth above.
SAGE Town of San Anselmo
Name: Tom Williard Name: Sean Condry P.E.
Title: Vice President Title: Public Works and Building Director Date: 8/9/2022 Date:
Item 2.5 Attachment 2
Item 2.5 Attachment 2
99 This Task Order is pursuant to the Master Services Agreement (“MSA”) between Sage Renewable Energy Consulting, Inc. (“SAGE”) and Town of San Anselmo (“CLIENT”) dated August 09, 2022.
This Task Order must be mutually executed before work is commenced.
Project Contacts
SAGE Town of San Anselmo
Name: David Williard Name: Sean Condry P.E.
Title: Principal Title: Public Works and Building Director Email: [email protected] Email: [email protected] Phone: 415.663.9914 Phone: 415.258.4676
Address: 101 Lucas Valley Road, Suite 302
San Rafael, CA 94903
Address: 525 San Anselmo Ave.
San Anselmo, CA 94960
Project Overview
This task order outlines feasibility study and project management services for the evaluation of solar PV on two CLIENT site(s). The feasibility evaluation will focus on the following site(s):
Site Address
Town Hall+ Police Station 525 San Anselmo Ave. San Anselmo CA 94960 Library 110 Tunstead Avenue San Anselmo CA 94960
Task Order Municipal Resiliency Centers - Solar PV + Microgrid Task Order # 22041-02
Project Name Municipal Resiliency Centers - Solar PV + Microgrid Client Town of San Anselmo
Physical Location San Anselmo, California
Estimated Start Date August, 2022
Estimated End Date November, 2022
Estimated Fees Time & Materials, NTE, total of all Tasks: $18,700 Item 2.5 Attachment 3
Item 2.5 Attachment 3
100
The Desktop Solar PV Feasibility Study is a project evaluation that includes conceptual solar PV system designs developed in discussion with CLIENT, and estimated build cost base on current market scenario, and financial performance for up to two design scenarios at each site. The analysis considers in-depth financial performance, and high-level facility designs necessary to make a fully informed decision about the project and to provide the information necessary for a following competitive procurement.
Scope of Work
Task 1 Desktop Solar PV Feasibility Study
1.1 Meet with CLIENT to discuss feasibility scope, schedule, goals, informational needs, constraints, and preferences.
1.2 Collect historical energy consumption data and information on planned changes to site usage/energy efficiency measures for each site to estimate future energy consumption.
1.3 Review and finalize system sizing and locations for each site with CLIENT.
1.4 Create models of conceptual PV system designs for each site, sized to offset future site energy consumption.
1.5 Estimate system costs and approximate value of energy based on similar recent projects near CLIENT location.
1.6 Identify and quantify potential future EVSE locations and infrastructure to be collocated with PV infrastructure.
1.7 Generate PV system annual 15-minute energy production profiles utilizing Helioscope design software.
1.8 Perform tariff modeling using consumption and production data. Review avoided value of energy generated on available and future tariffs (if known) within the range of potential system sizes. Determine optimal sizing, locations and tariff(s).
1.9 Perform financial modeling with multiple financing scenarios as determined with CLIENT.
This Task Order pricing assumes analysis of up to three finance options: Power Purchase Agreement (PPA), Lease, and cash purchase using bond funding.
1.10 Create high-level project schedule and identify any critical milestones.
1.11 Conduct telephone meetings as needed.
1.12 Prepare draft technical memorandum, including financial results, project schedule, and review with CLIENT.
1.13 Incorporate CLIENT feedback into report and prepare feasibility presentation slide deck.
1.14 Assist with presentation of findings to staff, Climate Action Committee, and Town Council if required.
Site Visits: One for site evaluations, if required.
Item 2.5 Attachment 3
Item 2.5 Attachment 3
101
Schedule and Deliverables
Task Start Date End Date Deliverables
1 Desktop Solar PV
Feasibility Study 8/2022 11/2022 − Draft & Final Memo
− Board Presentation
Project Requirements and Assumptions
1. Travel to CLIENT sites per site visit assumptions outlined in Scope of Services. Project travel generally assumes one representative per visit unless otherwise noted. Additional travel beyond the trips listed may require additional budget.
2. Assumes schedule listed. Delays or extension of the assumed schedule outside of SAGE’s control may require additional budget.
3. All deliverables will be delivered in electronic format.
4. Site information/data will be made available to SAGE as needed. Should on-site review and/or data collection be added to the scope, the on-site work will be limited to visual inspections of potential system locations, electrical services, and existing site conditions.
5. CLIENT will provide estimates of changes in electricity consumption at proposed sites based on energy efficiency measures, anticipated changes site usage, and new construction.
6. CLIENT will provide access to all sites under consideration for site walks, including access to electrical services at each site.
7. Feasibility will not include new or invasive site investigations (e.g. geotechnical studies, structural investigation, shutdown/inspection of electrical services, etc.).
Fee and Payment Schedules
The Task fees listed in this section are based on anticipated workload for the scope set forth in this Task Order. For all tasks performed under this Task Order, SAGE has set both a Time and Materials (T&M) Not to Exceed (NTE) maximum cost, as well as a Fixed-Fee payment per Task as shown in the table below. CLEINT may elect to contract using either T&M NTE billing or Fixed Fee billing. Asneeded/contingency is for unforeseen or additional project services and only proceeds with written direction from CLIENT.
Estimated Fees
SAGE will provide services under this task order for the fees shown in the Fee Table below. CLIENT may select either T&M NTE billing or Fixed Fee per Task billing.
Item 2.5 Attachment 3
Item 2.5 Attachment 3
102
Task T&M NTE
1 Investment-Grade Solar PV Feasibility Study $18,700
Total $18,700
Hourly Fee Schedule
Updated hourly fees will be provided by Sage prior to each new calendar year. SAGE will notify CLIENT when 80% of a task’s budget has been completed and will not exceed NTE limits without consent of CLIENT.
Title 2022 2023
Principal $295 $310
Associate Principal $250 $265
Subject Matter Expert $395 $415
Senior Project Manager $245 $260
Project Manager $215 $225
Senior Engineer/Data Scientist $215 $225
Construction Manager $200 $210
Engineer/Data Scientist $185 $195
Senior Analyst/Technician $185 $195
Analyst/Technician $155 $160
Program Support Specialist $115 $120
Energy Intern $115 $120
Project Administrator $90 $95
Term of Fee Schedule
The Fee Schedule above is for project work completed through December 31, 2024.
Billing and Payment Terms
SAGE invoices monthly with terms of Net 30.
Item 2.5 Attachment 3
Item 2.5 Attachment 3
103
If schedule is extended as a result of CLIENT, regulatory, or Developer or other contractor/vendor actions or inactions, SAGE will consult with CLIENT on utilizing contingency funds or extending the budget as needed.
Based on the CLIENT preference, and findings from the feasibility study and RFP process; the project may be financed through a PPA agreement with a third-party developer, owner, and operator. The PPA contract will require the PPA Vendor to reimburse CLIENT for SAGE’s fees per the Project Development Costs schedule that will be included in the RFP and PPA contract. SAGE’s fees will be included in the project financing and reflected in the PPA electricity costs.
Reimbursable Expenses
Fees assume all deliverable materials for the project will be provided digitally. Printed copies of documents will be billed at cost plus 10%. For time and materials fee structure projects, all reasonable and ordinary expenses are reimbursable at cost plus 10%.
Travel Costs
When air travel is required, coach class airfare will be used for domestic air travel and business class airfare will be used for international travel. Personnel travel time from our office to project location is billable at the full hourly rate. Meals and lodging will be billed at cost. Vehicle driving mileage will be billed at the current IRS mileage rate.
Subconsultant Fees
Subconsultant fees will be passed through at cost plus 15%.
IN WITNESS WHEREOF, authorized representatives of both SAGE and CLIENT have executed this agreement as of the date set forth above.
SAGE Town of San Anselmo
Name: Tom Williard Name: Sean Condry P.E.
Title: Vice President Title: Public Works and Building Director Date: 8/9/2022 Date:
Item 2.5 Attachment 3
Item 2.5 Attachment 3
104
ITEM 2.5 ATTACHMENT 4
ITEM 2.5 ATTACHMENT 4
105
Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 2.6.
FROM:
Robyn Clifford, Payroll and Benefits Technician
SUBJECT:
Consider rescheduling the November 8, 2022 Town Council meeting.
RECOMMENDATION
That Council consider rescheduling the November 8, 2022 Town Council meeting due to the General Election being held on the same day.
BACKGROUND
Staff is proposing that the regularly scheduled Town Council meeting on Tuesday, November 8, 2022 be rescheduled for Tuesday, November 15, 2022. The General Election is also scheduled for Tuesday, November 8, 2022.
DISCUSSION
Staff is recommending that the regular Town Council scheduled for Tuesday, November 8, 2022 be rescheduled for Tuesday, November 15, 2022.
FISCAL IMPACT
There would be no direct fiscal impact to the Town to approve this item.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The proposed project is exempt from the California Environmental Quality Act (CEQA), under the “common sense” exemption, because it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. (Cal. Code Regs. tit. 14, § 15061).
Town of San Anselmo Page 1 of 1 Printed on 8/18/2022
powered by Legistar™106
Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 3.
FROM:
Kevin MacLeod, Recreation Coordinator and Sean Condry, P.E., Public Works Director SUBJECT:
Proposed Hilldale Pocket Park Project
RECOMMENDATION
That Council receives an update for a proposed pocket park on Jordan Avenue between Hilldale Drive and Forbes Avenue and provide direction to staff.
BACKGROUND
In 1977 the Town Council closed Jordan Avenue at the corner of Hilldale Drive due to concerns about traffic and speeding in the area. The posted 15-mile speed limit was unenforceable by the police department and did not have the desired result of slowing traffic. As a result, resolution No. 1710 was passed leaving Jordan Avenue open at the United Markets loading area to emergency vehicles and one-way eastbound traffic. The Resolution left an unused portion of Jordan Avenue to the west of the United Markets loading area. Aside from Jordan Avenue neighbors parking their cars in this area the space has gone unused. In the past 5 years a group called Friends of Jordan Avenue have requested the Town build a pocket park in this area and beautify an otherwise abandoned section of Jordan Avenue.
DISCUSSION
The Town of San Anselmo hired an intern for the summer of 2022, Ella Acker, supervised by the Recreation Department, to work on the Hilldale Park Project and survey neighbors in the Jordan Avenue area, as well as other residents in the larger San Anselmo area. A hard copy flyer for the survey was mailed out to 268 addresses in a 700 sq. ft. radius surrounding the proposed park location on June 9, 2022, and the survey link was in the Town Manager’s Newsletter for 4 weeks. The Town received 162 survey responses, largely in favor of the proposed pocket park. We have attached the survey results, Attachment 1. · 125 of the 162 respondents answered they would like a pocket park on Jordan Avenue · 53 of the respondents indicated they would be willing to contribute additional time and/or money to the project
· 76 of the respondents said they live within ½ mile from the proposed Hilldale Pocket Park Along with the survey Town staff conducted a series of public meetings. The first was a Zoom meeting on July 7, 2022, and the second was on July 9, 2022, in person at the proposed location of the park. During the meetings town staff presented information on the park layout and features while answering questions from the local community and addressing their concerns.
The Town of San Anselmo most common question and concern was regarding Page 1 of 2 through traffic from the United MarketPrinted on 8/18/2022 parking lot to powered by Legistar™107
TO: Town Council 8/23/2022 Item #: 3.
The most common question and concern was regarding through traffic from the United Market parking lot to Jordan Avenue and Forbes Avenue. The park will not block the driveway for the United Market loading area and as a result will not affect current traffic patterns in any way. Public comment and feedback from the public during the two meetings was positive and any concerns were addressed by town staff.
In addition, Town staff met with the owner of United Markets since the proposed pocket park location backs up to their loading area and parking lot. The owner spoke with the manager on site, and they had no concerns about the proposed project or location.
Friends of Jordan Avenue created the attached rendering of the park, Attachment 2. The proposed park for phase 1 would be approximately 2000 sq feet with a bark surface similar to the Creek Park picnic area. There would be two picnic tables and an ADA compliant picnic table. Garbage facilities would be installed and collected by Marin Sanitary. Friends of Jordan Avenue would build the proposed perimeter fence with materials supplied by the Town. In addition, the Town would install new ADA ramps at each end of the street. The rendering shows landscaping at each end but there is no water currently and this would either need to come from adjacent properties or the Town would need to look into installing a water meter. Any plants would need to be drought tolerant and approved by MMWD.
Both Maggiora and Ghilotti and Van Midde Concrete have offered to complete some items at cost including removal of the asphalt on the street and installation of the concrete pads. With the volunteer efforts of the Friends of Jordan Avenue, help of contractors, and the Town, the estimated cost to build the park is approximately $30,000. Weekly maintenance of the proposed pocket park would be a shared effort with the community and the Town for now.
FISCAL IMPACT
Construction of the Hilldale Pocket Park is estimated to be approximately $30,000 and funding would come from the General Fund.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The proposed pocket park is categorically exempt under CEQA existing facilities 15301 c. Creation of a new pocket park is consistent with the Climate Action Plan section S-1 Urban Forests and Ecosystems and under S-2 Habitat Restoration and Soil Regeneration.
Town of San Anselmo Page 2 of 2 Printed on 8/18/2022
powered by Legistar™108
Overview: This survey was sent out in early June to 270 people via mail and 100+ people via online newsletter. The survey asked respondents to respond to a series of multiple-choice questions regarding personal preferences for park features and accessibility (limited to one answer per question). 165 responses were collected with a response rate of roughly 40%. Most favored answers are highlighted in yellow.
Survey Data
Question 1: Would you like a pocket park on Jordan Avenue? • Yes – 77.16% (125/162)
• No – 22.84% (37/162)
Question 2: Would you be willing to contribute additional time and/or money to the project in order to have more enhanced features?
• Yes, I would be willing to contribute additional time and money – 24.32% (18/74)
• Yes, I would be willing to contribute additional time – 31.08% (23/74) • Yes, I would be willing to contribute additional money – 16.22% (12/74) • No, I would not be willing to contribute additional time nor money – 28.38% (21/74)
Question 3: What surface would you like the park to have? • Tanbark – 55.17% (48/87)
• Artificial Turf – 26.44% (23/87)
• Cement – 6.90% (6/87)
• Rubber – 11.49% (10/87)
Question 4: What uses would you like the park to have?
• Children’s Play Area – 45.65% (42/92)
• Relaxation Spot – 33.70% (32/92)
• Picnic Spot – 14.13% (13/92)
• Exercise Spot – 6.52% (6/92)
Question 5: Would you like a shaded area in the park?
• Yes – 95.60% (87/92)
• No – 4.40% (4/92)
Question 6: What features would you like the park to have? • Play Structure – 27.78% (25/90)
• Swing Set – 10.00% (9/90)
• Benches – 27.78% (25/90)
• Picnic Tables – 25.56% (23/90)
• Outdoor Exercise Equipment – 4.44% (4/90)
• Outdoor Chess/Checkers Tables – 4.44% (4/90)
Item 3 Attachment 1
Item 3 Attachment 1
109
Question 7: Would you like to have gate access from the park to United Market? • Yes – 82.80% (77/93)
• No – 17.20% (16/93)
Question 8: Would you like bike access through the park? • Yes, a bike path – 23.40% (22/94)
• Yes, but walk bikes on sidewalk – 53.19% (50/94)
• No bike path – 23.40% (22/94)
Question 9: Would you like live plants for the park landscape and would you be willing to contribute to taking care of them?
• Yes, I want live plants and I will realistically be able to contribute to taking care of them – 18/09% (17/94)
• Yes, I want live plants but I don't think I will realistically be able to contribute to taking care of them – 36.17% (34/94)
• No, I do not want live plants and I do not want to contribute to taking care of them – 6.38% (6/94)
• I will leave the landscape up to the park project managers – 39.36% (37/94) Question 10: Do you have children who might go to the park? • Yes, infant/toddler – 6.25% (6/96)
• Yes, pre-school – 14.58% (14/96)
• Yes, elementary school – 11.46% (11/96)
• Yes, middle school – 4.17% (4/96)
• Yes, high school – 4.17% (4/96)
• No – 59.38% (57/96)
Question 11: If you are a senior (65+), do you plan on accessing the park? • Yes – 51.79% (29/56)
• No – 48.21% (27/56)
Question 12: What is your age range?
• Under 18 – 0.00% (0/98)
• 18-24 – 1.02% (1/98)
• 25-34 – 7.14% (7/98)
• 35-44 – 17.35% (17/98)
• 45-54 –20.41% (20/98)
• 55-64 – 27.55% (27/98)
• 65+ – 26.53% (26/98)
Question 13: Where are you a resident of?
• San Anselmo (within ½ mile from Hilldale Park) – 74.51% (76/102) • San Anselmo (more that ½ mile from Hilldale Park) – 21.57% (22/102) • Fairfax – 0.98% (1/102)
• Other – 2.94% (3/102)
Item 3 Attachment 1
Item 3 Attachment 1
110
Hilldale Park
San Anselmo
Hilldale Park | Concept Drawings 1/4 Friends of Hilldale | March 01, 2022 Item 3 Attachment 2
Item 3 Attachment 2
111
Hilldale Park | Concept Drawings 2/4 Friends of Hilldale | March 01, 2022 Hilldale Dr. Carolina Ave Cottage Ave. Jordan Ave.
Park
Park Way Sequia Dr.
United Market Redhill Ave.
Forbes Ave.
Item 3 Attachment 2
Item 3 Attachment 2
112
Phase 1 - Concept Plan
Hilldale Park | Concept Drawings 3/4 Friends of Hilldale | March 01, 2022 Item 3 Attachment 2
Item 3 Attachment 2
113
Phase 1 - Concept Rendering
Hilldale Park | Concept Drawings 4/4 Friends of Hilldale | March 01, 2022 Adjacent
Property
Adjacent
Property
Hilldale Dr.
Item 3 Attachment 2
Item 3 Attachment 2
114
Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 4.
FROM:
Dannielle Mauk, Director of Community Services
SUBJECT:
San Anselmo Community Gardens Draft Bylaws and Rules
RECOMMENDATION
Staff recommends that Town Council adopt the attached bylaws and rules for the San Anselmo Community Gardens at Robson-Harrington Park.
BACKGROUND
The Town of San Anselmo owns the Community Gardens at Robson-Harrington Park. The gardens were created in the 1970’s and serve as a space to grow food, plants, recreate, and relax. Historically, the Town entered into an agreement twenty-nine years ago with the garden steering committee to manage and operate the gardens.
In the past, the garden steering committee established rules that were approved by garden members. Staff is proposing to establish a set of bylaws and rules that will provide consistency and transparency for the management of the community gardens. Moving forward the gardens would be managed by the Recreation Department with oversight by the Parks and Recreation Commission.
The Parks and Recreation Commission reviewed the Community Garden bylaws and rules at their monthly meeting on August 16, 2022. The bylaws and rules were unanimously approved and recommended for approval to the Town Council.
DISCUSSION
Over the past six months there have been problems with plot assignments and management of the community gardens.
Town Council asked staff to review the overall operations. As a result, staff worked with the Parks and Recreation Commission and created a sub-committee consisting of two Commissioners, two representatives from the community garden’s steering committee and one staff member. The sub-committee met on several occasions over a two-month period to discuss and revise the proposed bylaws and rules. The purpose of the revised bylaws is to restore governance and management of the community gardens to the Town. The purpose of the garden rules is to set forth what is expected of community garden members.
With the support of the garden steering committee, the proposed bylaws and the rules were distributed to the community gardeners, and community garden membership meetings were held on July 9 and August 6, 2022, at Robson Park.
The most contentious issue addressed at the general meetings was the residency requirement for garden membership.
Most Marin towns only permit residents to be members of their community garden. Currently, residents and nonTown of San Anselmo Page 1 of 3 Printed on 8/18/2022 powered by Legistar™115
TO: Town Council 8/23/2022 Item #: 4.
residents may be members of our community garden. There are 33 garden plots and 10 are held by non-residents. There are 40 people on the waiting list for garden plots, of which 30 are San Anselmo residents. The proposed bylaws presented at the July 9 general meeting provided that commencing January 1, 2024, only San Anselmo residents could be garden members. There was strong resistance by many long-term garden members to the residency requirement.
They emphasized that it fell unfairly on elderly gardeners for whom the garden is a vital part of their lives and that it overlooks the critical role these gardeners have played in the development and maintenance of the garden.
Upon further consideration of the valuable contribution of the non-resident members, the proposed bylaws were revised to permit all current members to continue their garden membership provided that 10 additional plots are created by January 1, 2024. All new members must be residents of San Anselmo. The Town will work with the garden steering committee to create the new plots. This will be accomplished in a variety of ways, including creating new plots in existing empty spaces, dividing some plots, and gardeners sharing plots. This will have the effect of providing plots for at least 10 residents on the waiting list. Additional plots will also become available through attrition.
ANALYSIS
Over the years the lack of Town involvement and the need to follow through with compliance issues in a timely manner has led to challenges with the management of the community gardens.
Staff researched the operations of community gardens throughout Marin and found that the majority are managed by their recreation departments. The Recreation Department will work closely with the Public Works Department on maintenance of the community garden and plot inspections.
For the above stated reasons, staff is recommending that the 1993 agreement with the Community Gardens be retired and the new bylaws and rules be the governing documents for the Robson Harrington Community Gardens. The management of the gardens would be placed under the supervision of the Recreation Department and the Parks and Recreation Commission. The Commission will interview and appoint members to the steering committee. Staff will meet at least quarterly with the steering committee to support the management and operations of the gardens.
The bylaws and rules will be re-evaluated annually by the steering committee, Commission and staff, and any updates would be reviewed and adopted by the Parks and Recreation Commission.
FISCAL IMPACT
Currently, the gardeners have an independent account that pays for water usage and annual mulching supplies. Moving forward, the balance of this account will be transferred to the Town, and all dues will be collected by the Town and deposited into a town account. Disbursements from this account must be approved by the steering committee and the Director of the Parks and Recreation Department. This account will pay for the above expenses and any surplus will be used towards maintenance of the gardens.
As part of the new arrangement, there are approximately 5 new plots that will be created in the existing empty spaces.
Staff propose to help create the new plots by installing two posts for a new gate, installing the main water lateral, and supplying the materials for new fencing. The total cost for this work would be approximately $1,200 per plot or $6,000 total that would need to come from the general fund. Additional plots will be created by current gardeners dividing or sharing existing plots. The new plot holders would be responsible for finishing the fence, installing irrigation, and any other plant bedding.
Town of San Anselmo Page 2 of 3 Printed on 8/18/2022
powered by Legistar™116
TO: Town Council 8/23/2022 Item #: 4.
CONCLUSION
Staff recommends that Town Council adopt the attached bylaws and rules for the San Anselmo Community Gardens at Robson-Harrington Park.
Town of San Anselmo Page 3 of 3 Printed on 8/18/2022
powered by Legistar™117
Draft San Anselmo Community Garden Bylaws
MISSION STATEMENT
The San Anselmo Community Garden at Robson-Harrington Park (SACG or Garden) will endeavor to create a sharing and learning environment in a productive, well-maintained community garden where its members are committed to organic gardening practices, stewardship of soil and water, and in cooperation with others for the enjoyment of all.
GARDEN GOVERNANCE
The San Anselmo Parks and Recreation Department will have oversight of the Garden.
A Steering Committee appointed by the Parks and Recreation Commission will help develop policies and coordinate garden activities. The Steering Committee shall consist of 3 or more gardeners and at least one staff member of the Parks and Recreation Department. Steering Committee members will serve for a term of 2 years. The Steering Committee will meet quarterly, and its meetings must comply with the Ralph M. Brown Act.
Changes to these Bylaws should be recommended to the Steering Committee and/or Parks and Recreation Department. The Parks and Recreation Commission must approve all changes.
GARDEN DESCRIPTION AND MEMBERSHIP
The SACG is a recreational facility that belongs to the Town of San Anselmo and is controlled by the San Anselmo Parks and Recreation Department.
The garden consists of 33 plots and is located at the Robson-Harrington Park in San Anselmo.
New members of the garden must be residents of San Anselmo. Current non-resident members of the garden may continue their garden membership provided 10 additional plots are created by January 1, 2024. This may be accomplished by creating new plots and/or subdividing existing plots.
A Waiting List for garden membership will be maintained by the Parks and Recreation Department. San Anselmo residents may add their names to the Waiting List anytime during the year.
ANNUAL DUES
Members will pay annual dues as follows:
Annual Dues: $150
* San Anselmo nonprofit organizations are eligible for a waiver of the annual dues.
Item 4-Attachment 1
Item 4-Attachment 1
1 118
1) Be an active gardener
2) Follow all garden rules
3) Participate in Community Service
COMMUNITY SERVICE
In addition to plot and pathway maintenance, all gardeners are expected to volunteer in the garden. This includes annual garden cleanup days, teaching classes, or any activity deemed appropriate by the Parks and Recreation Department and/or the Steering Committee.
Alternate tasks will be assigned to those unable to participate in organized activities.
In addition, it is a goal of the Garden to grow, harvest and contribute food to designated community organizations. A collection bin will be available, and gardeners are encouraged to place vegetables into the bins. Garden volunteers will donate them to designated community organizations. Vegetables should not be left unpicked in garden plots. Each gardener should designate an alternate gardener to pick and donate vegetables from his/her plot rather than let them spoil.
If the community demand for a garden plot is low (waiting list below 10) a Community Plot can be set aside, and its produce will be contributed to designated organizations within the county. The Community Plot may be used for Parks and Recreation Department programing.
Existing gardeners will maintain the Community Plot.
Item 4-Attachment 1
If a member joins the Garden during the gardening year, the annual dues will be $150 if there are 7 or more months remaining or $75 if there are 6 or fewer months remaining. Dues are non-refundable.
The Town of San Anselmo (Town) will collect the annual dues, which will be placed in an account for the Garden. The Town will maintain a checking account for the Garden. The Steering Committee may request disbursements from the account, which must be approved by the Director of the Parks and Recreation Department.
PLOT ASSIGNMENT
The annual renewal process and plot assignments will occur prior to the start of the gardening season as designated by the Parks and Recreation Department.
Gardening season begins on February 1st of each year.
The Steering Committee and the Parks and Recreation Department will be responsible for creating, assigning, and configuring garden plots. Renewing gardeners will be reassigned the plot they gardened the previous year.
Available plots will be assigned to new gardeners from the Waiting List. All structures in garden plots must be approved by the Parks and Recreation Department.
REQUIREMENTS FOR GARDENERS TO REMAIN IN GOOD STANDING
The Garden requires active participation. Following is the minimum required of each gardener who desires to be a member of the garden community.
Item 4-Attachment 1
2 119
1 Draft San Anselmo Community Garden Rules
Mission:
The San Anselmo Community Garden at Robson-Harrington Park (SACG or Garden) will endeavor to create a sharing and learning environment in a productive, well-maintained community garden where its members are committed to organic gardening practices, stewardship of soil and water, and in cooperation with others for the enjoyment of all.
COMMUNITY GARDEN RULES
1. Code of Conduct: The code is a tool for understanding and upholding acceptable, safe, and respectful standards for community garden members.
1. Model behavior that respects the human rights of all people:
● Treat all community members and garden visitors with respect, courtesy, and dignity. ● Do not harass with the use of insensitive or offensive language such as sexist, ageist, racist, or profane commentary either written or verbal. ● Refrain from engaging in physical or emotional abuse toward others.
2. Use reasonable care to protect and safeguard Robson Garden property.
3. Follow the rules established by the town for The Robson-Harrington Park.
2. Annual Dues Annual dues are currently $150.00. Payment is due by the Fall meeting. Members will be contacted immediately if Dues are not paid by that meeting date. Dues 14 days past due are grounds for expulsion. There are scholarship funds available through the San Anselmo Parks and Recreation Department.
3. General Meetings: There is a minimum of two per year. Members are required to attend at least one meeting per year.
4. Community Garden Work Days: All gardeners are expected to help with tasks that benefit the community garden. Everyone is required to participate in the work days. There will be a minimum of two work days per year. Each garden member with their own plot is expected to perform a minimum of 4 hours of work each work day. If two unrelated people share a plot, the expectation is that each person will perform a minimum of 4 hours of work each work day. Those members unable to participate on the scheduled work day are required to put in at least 4 hours to complete a task, either in advance of the work day, or within 30 days after the work day. The member must contact the work Item 4 - Attachment 2
Item 4 - Attachment 2
120
2 5. Maintenance: Members should maintain their plot in a productive state, either with vegetables, flowers, herbs, or cover crops that do not shade or impede on any other plot. Crops must be harvested when ripe and not allowed to rot on plants. Deadhead perennial plants. ● If you will be absent from your plot, it is your responsibility to arrange for your plot to be maintained by someone else and for a period no longer than 3 months. You must notify the Steering Committee of an arrangement that is longer than 2 weeks.
6. Structures in plots: Growing beds shall be constructed with wood only. Except for seasonal tomato cages and trellis that do not impede on neighboring plots, no structure may be erected in a plot taller than 6 feet and must blend harmoniously with the Robson Park property. Any structure taller than 3 feet that is not for the purpose of seasonal growing is subject to Steering Committee and Parks and Recreation Department approval. All structures must be easily removeable and must be removed when the plot is vacated.
7. Toxic Materials: Chemical pesticides, herbicides, and fungicides are not allowed. Garden beds will be constructed with non-pressure treated lumber only. Existing PT lumber should be phased out as soon as possible.
8. Soil: Replenish annually with at least 1” or more of organic matter such as compost or manure.
9. Invasive Plants: Avoid invasive plants and vines—any kind of plant that takes over and spreads.
Invasive plants and vines include, but are not limited to: ornamental grasses, oxalis, fennel, horseradish, mint, dandelion, Jerusalem artichoke, passionflower vine and perennial morning glory vine. The Marin Master Gardeners website has information on invasive plants. Growing marijuana, for any purpose, is prohibited.
10. Weeds: Maintain a weed-free plot, including the edges of your plot. Do not allow weeds to spread by seed or invasion.
11. Plant Debris: Put all plant debris in the green bins; do not dump in the common areas or outside the green bins. When all the green bins are full, members have permission to fill empty black cans. Use the ones that have NO lid first.
Item 4 - Attachment 2
day coordinator to select a task. Sample jobs include weeding and pruning plants in common areas and repairing fences.
Garden Plots:
Item 4 - Attachment 2
121
3 12. Containers: Members may keep no more than 5 empty containers, such as buckets, and 1 tightly closed storage container per plot. Store tomato cages and stakes together and keep tools tidy and in a manner that does not invite or shelter pests.
13. Rodents, Mosquitos, Pests: Members shall not maintain any condition in their plot which allows rodents, mosquitos, or other pests a permanent home. (e.g., No standing water such as bird baths; No piles of stored material that give rodents cover and habitat.)
14. Water: Do not waste it! Members pay our total water bill. ● Use mulch and drip irrigation when possible.
● Always turn off the main shut-off valve at the top of the garden when you leave to avoid pipe breaks leading to high water bills.
● Plot holder or designee must be in the garden if water is on. ● All irrigation systems should have a manual timer. If water is found left on and no one is in the plot, the system will be shut off.
● Fix or report all dripping and leaking faucets and hose bibs. ● Minimize watering outside of your plot.
● All plots must comply with MMWD and San Anselmo water restrictions.
15. Trees in Common Areas: Trees in common areas are not to be touched/removed or altered without the approval of the Steering Committee and the Parks and Recreation Department
16. Trees in Plots: No trees are to be planted in plots. Current existing trees should be pruned to 6 feet in height or removed.
17. Picking: Don’t pick what you didn’t grow.
18. Family members and Pets in the Garden: Children and pets must be supervised at all times.
Members must keep dogs on a leash when it is in their plot.
19. Parking: Parking is not allowed in the Robson-Harrington parking area Monday – Friday, 3 pm – 6 pm, during the school year. These parking rules may change over time, and members are responsible for complying with posted signs.
20. Plot Inspections. The Steering Committee will conduct quarterly inspections to determine whether garden plots are in compliance with the Garden Rules.
21. Safety: Members must maintain all common areas in a safe condition.
Item 4 - Attachment 2
Item 4 - Attachment 2
122
4 a Code of Conduct is violated.
b Failure to attend at least 1 meeting annually.
c Failure to attend or participate in all the work days or common area maintenance. d Failure to pay annual dues by the Fall meeting.
e Garden Plot is out of compliance.
Process to Address Noncompliance:
When a member is out of compliance with the Garden Rules, they will be given the opportunity to correct per the below process.
1. 1st incident: A representative of the Steering Committee will contact the noncompliant member by phone and email to alert the member of the violation. Because every circumstance is unique, a solution including a deadline for compliance will be agreed upon and documented in an email.
2. 2nd Incident: The member will be contacted by phone and email and in the same manner as #1, but with a notice that the plot will be revoked if there are any further infractions.
3. 3rd incident: The member’s plot privileges will be immediately revoked.
Failure to comply or correct violation(s) within the allotted time agreed upon by the member and the Steering Committee will result in the loss of the gardener’s plot. Whether the member can go back on the waiting list will be determined by the Director of the Parks and Recreation Department. When a gardener has their privileges revoked, they will not be reimbursed dues or for the cost of the structures or plants in the plot.
Item 4 - Attachment 2
22. Changes to Garden Rules: The Steering Committee and the Director of the Parks and Recreation Department must approve all changes to the Garden Rules.
Gardeners or Plots in Violation of Garden Rules
1. Members will be out of compliance with the Garden Rules if any of the following conditions exist:
Item 4 - Attachment 2
123
Item 4-Attachment 3
Item 4-Attachment 3
1 124
Item 4-Attachment 3
Item 4-Attachment 3
2 125
Item 4-Attachment 3
Item 4-Attachment 3
3 126
Item 4-Attachment 3
Item 4-Attachment 3
4 127
Item 4-Attachment 3
Item 4-Attachment 3
5 128
Item 4-Attachment 3
Item 4-Attachment 3
6 129
Item 4-Attachment 3
Item 4-Attachment 3
7 130
Item 4-Attachment 3
Item 4-Attachment 3
8 131
Item 4-Attachment 3
Item 4-Attachment 3
9 132
Item 4-Attachment 3
Item 4-Attachment 3
10 133
Item 4-Attachment 3
Item 4-Attachment 3
11 134
Item 4-Attachment 3
Item 4-Attachment 3
12 135
Item 4-Attachment 3
Item 4-Attachment 3
13136
Item 4-Attachment 3
Item 4-Attachment 3
14 137
Item 4-Attachment 3
Item 4-Attachment 3
15 138
Item 4-Attachment 3
Item 4-Attachment 3 16
139
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
140
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
141
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
142
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
143
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
144
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
145
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
146
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
147
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
148
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
149
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
150
ITEM 4 ATTACHMENT 4
ITEM 4 ATTACHMENT 4
151
Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 5.
FROM:
Mattie O’Grady, Recreation Supervisor & Dannielle Mauk, Director of Community Services SUBJECT:
Consider Adoption of Resolution Defining the Framework for the San Anselmo Arts Commission
RECOMMENDATION
Staff Recommends that Town Council adopt the attached resolution to define the framework for the San Anselmo Arts Commission (attachment 1) as written or with the alternate appeal language proposed by the Commission (attachment 2).
BACKGROUND
In November 2019, the Town Council unanimously adopted Resolution No. 4313 defining the framework for the San Anselmo Arts Commission. Since the adoption of this resolution the Commission has evolved and set goals to pursue larger public art projects, including the Utility Art Boxes. While coordinating and implementing these public art projects, it became clear that additional parameters involving the approval process should be explicitly stated and the role of the Commission should be clearly defined.
In October 2021 the Town Council discussed the recommended revisions to the resolution and asked staff to come back after exploring additional parameters. The Council asked that the Resolution include the following items. First, an informal pre-approval of projects by the Town Council to ensure that the Commission does not commit too much time and resources to a project without Council support. Second, the Council requested a process to permit the Council to call up projects for review following approval by the Arts Commission.
In February 2022 the Town Council discussed the additional recommended revisions and explicitly asked staff to return after incorporating a general appeal process for an aggrieved party.
DISCUSSION
Town staff has revised Resolution No. 4313 and incorporated Town Council feedback from the February 2022 meeting. The attached resolution includes the proposed amendments.
The process for developing and approving Arts Commission projects includes the following steps:
1. The Arts Commission will present a proposed project type and location to Town Council for informal pre-approval.
2. The Arts Commission will work with Town staff and private property owners to establish objective guidelines for each project.
Town of San Anselmo Page 1 of 2 Printed on 8/18/2022
powered by Legistar™152
TO: Town Council 8/23/2022 Item #: 5.
3. A sub-committee of the Arts Commission will work with property owners and any specific stakeholders to identify a project theme, create an Open or Invitational Request for Proposals, review proposals, develop a short list, and select an artist.
4. All neighbors within 300 feet of the proposed project location will be notified of the project at least ten (10) days before the Arts Commission considers approval of the project.
5. The sub-committee of the Arts Commission will present the selection to the full Arts Commission for approval.
6. Once a project is approved by the Commission it will undergo a staff review.
7. All projects on public or private property will be reviewed by the Planning Director or Planning Commission to ensure compliance with the sign ordinance and other relevant Town regulations.
8. The Town Council will review and approve the use of public property or review and approve the location on private property.
b. The Arts Commission retains the right to terminate an agreement with the artist at any time based on a majority vote of the Commission and subject to the terms of the agreement.
Based on a request from the Town Council in February, staff developed the following proposal for an appeal provision for the resolution:
c. Within ten (10) days of a final decision by the Arts Commission, an interested party may appeal the decision to the Town Council by filing a written appeal and paying the Town’s appeal fee. Any appeal will be heard in the same manner as an appeal filed pursuant to San Anselmo Municipal Code section 1-4.01 et seq.
The Arts Commission provided the following appeal provision for the Council’s consideration:
c. Within ten (10) days of a final decision by the Arts Commission, the project artist or applicant may appeal the decision to the Town Council by filing a written appeal and paying the Town’s appeal fee. Any appeal will be heard in the same manner as an appeal filed pursuant to San Anselmo Municipal Code section 1-4.01 et seq.
FISCAL IMPACT
There would be no direct fiscal impact to the Town to approve this item.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The proposed project is exempt from the California Environmental Quality Act (CEQA), under the “common sense” exemption, because it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. (Cal. Code Regs. tit. 14, § 15061).
CONCLUSION
Staff respectfully requests that the Council adopt one of the attached Resolutions with either of the appeal provisions noted above.
Town of San Anselmo Page 2 of 2 Printed on 8/18/2022
powered by Legistar™153
RESOLUTION NO. ___________
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF SAN ANSELMO REPEALING RESOLUTION NO. 4313 TO DEFINE THE FRAMEWORK FOR THE
SAN ANSELMO ARTS COMMISSION
WHEREAS, the growth and flourishing of art and culture enhances the quality of life in a community, and contributes to the public's enjoyment of life, education, sense of community pride, and local identity; and
WHEREAS, the encouragement of art and culture is an appropriate matter of concern of the Town; and
WHEREAS, the Town's prestige and general welfare will be promoted by providing recognition that art and culture, and the creative spirit which motivates them and which they personify, are valued as an essential part of the Town's resources; and WHEREAS, San Anselmo has a rich history of citizen involvement and volunteerism; and WHEREAS, the San Anselmo Arts Commission has been in existence for many years and need to update the guidelines for community service has been identified.
NOW, THEREFORE, BE IT HEREBY RESOLVED, that the Town Council re-establishes the parameters of the San Anselmo Arts Commission, as follows:
Section 1. Resolution No. 4313 is hereby repealed and replaced with the following provisions.
1. Charge: To add to the cultural character of the Ross Valley through any form of artistic expression.
2. Purpose:
a. Act in an advisory capacity to the San Anselmo Town Council on artistic, aesthetic, and other cultural aspects of community life.
b. Work cooperatively with Recreation Department staff, Community Services Director, and other public and private organizations in promoting art and cultural activities with the Ross Valley.
c. Sponsor public art projects on behalf of the Town of San Anselmo. 1) The Arts Commission shall be solely responsible for selecting and approving the artist and artwork for Commission-sponsored projects in accordance with the process outlined in section 7 below.
d. Encourage public-private partnerships, including the raising of funds, to assure the survival of the arts in the Ross Valley.
e. Report projects, shows, future endeavors, etc. to the San Anselmo Town Council.
3. Goals:
Item 5 - Attachment 1
Item 5 - Attachment 1 1
154
a. Providing a structure to facilitate the creation of art in all disciplines in the community to provide enrichment and enjoyment for the public. b. Promoting and exhibiting art and cultural works produced by Ross Valley artists. c. Promoting art education in the community and supporting art education in the schools using art displayed as a community outreach project. d. Using funds raised by the Commission for the development and implementation of projects and programs that promote the purpose of the Commission. e. Establishing a relationship between artists and the local business community. f. Organizing local community resources to better serve local artists and art groups in the Ross Valley and its citizens.
4. Organization: Commission membership shall consist of seven (7) members appointed by the Town Council and shall serve without pay. The commission shall include up to two youth Commissioners appointed by commission. The Council shall consider, but is not restricted to, the following criteria in making appointments to the commission:
a. Residency in the Ross Valley. No more than four (4) members of the commission shall be non-residents of the Town.
b. Representation to include a wide range of residents, with a variety of art disciplines and ability levels on the Commission.
c. Availability of time to participate actively as a working member of the commission, and to represent a broad cross section of interests.
5. Guidelines: The guidelines for the commission are as follows:
a. The commission shall annually elect a chairperson, vice chairperson, secretary, and such other officers-as deemed necessary for the efficient functioning of the commission.
b. All meetings of the commission shall be held in accordance with the Ralph M. Brown Act.
c. Regular meetings shall be held no less frequently than quarterly at a scheduled time and place in the Ross Valley.
d. Except as herein limited, the commission shall follow Rosenberg's Rules of Order. e. The Commission may establish Ad Hoc Committees as it deems necessary to accomplish its goals and objectives.
6. Terms: Members will serve three (3) one-year terms, except when a member is appointed for a shorter period to fill the end of a vacated term. A goal is to stagger the appointment schedule so that no more than one-half of the seats shall expire in any one year. Any member who misses more than three (3) unexcused consecutive meetings will be removed from the commission.
7. Process for developing public art projects.
a. Review and approval of each project will occur through a multi-step process with the Arts Commission.
Item 5 - Attachment 1
Item 5 - Attachment 1 2
155
1. The Arts Commission will present a proposed project type and location to Town Council for a non-formal pre-approval.
2. The Arts Commission will work with Town staff and private property owners to establish objective guidelines for each project.
3. A sub-committee of the Arts Commission will work with property owners and any specific stakeholders to identify a project theme, create an Open or Invitational Request for Proposals, review proposals, develop a short list, and select an artist.
4. All neighbors within 300 feet of the proposed project location will be notified of the project at least ten (10) days before the Arts Commission considers approval of the project.
5. The sub-committee of the Arts Commission will present the selection to the full Arts Commission for approval.
6. Once a project is approved by the Commission it will undergo a staff review.
7. All projects on public or private property will be reviewed by the Planning Director or Planning Commission to ensure compliance with the sign ordinance and other relevant Town regulations.
8. The Town Council will review and approve the use of public property or review and approve the location on private property
b. The Arts Commission retains the right to terminate an agreement with the artist at any time based on a majority vote of the commission and subject to the terms of the agreement.
c. Within ten (10) days of a final decision by the Arts Commission, an interested party may appeal the decision to the Town Council by filing a written appeal and paying the Town’s appeal fee. Any appeal will be heard in the same manner as an appeal filed pursuant to San Anselmo Municipal Code section 1-4.01 et seq.
I hereby certify that the foregoing resolution was duly passed and adopted at the regular meeting of the San Anselmo Town Council on ______________, 2022, by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
Item 5 - Attachment 1
Item 5 - Attachment 1 3 156
RESOLUTION NO. ___________
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF SAN ANSELMO REPEALING RESOLUTION NO. 4313 TO DEFINE THE FRAMEWORK FOR THE
SAN ANSELMO ARTS COMMISSION
WHEREAS, the growth and flourishing of art and culture enhances the quality of life in a community, and contributes to the public's enjoyment of life, education, sense of community pride, and local identity; and
WHEREAS, the encouragement of art and culture is an appropriate matter of concern of the Town; and
WHEREAS, the Town's prestige and general welfare will be promoted by providing recognition that art and culture, and the creative spirit which motivates them and which they personify, are valued as an essential part of the Town's resources; and WHEREAS, San Anselmo has a rich history of citizen involvement and volunteerism; and WHEREAS, the San Anselmo Arts Commission has been in existence for many years and need to update the guidelines for community service has been identified.
NOW, THEREFORE, BE IT HEREBY RESOLVED, that the Town Council re-establishes the parameters of the San Anselmo Arts Commission, as follows:
Section 1. Resolution No. 4313 is hereby repealed and replaced with the following provisions.
1. Charge: To add to the cultural character of the Ross Valley through any form of artistic expression.
2. Purpose:
a. Act in an advisory capacity to the San Anselmo Town Council on artistic, aesthetic, and other cultural aspects of community life.
b. Work cooperatively with Recreation Department staff, Community Services Director, and other public and private organizations in promoting art and cultural activities with the Ross Valley.
c. Sponsor public art projects on behalf of the Town of San Anselmo. 1) The Arts Commission shall be solely responsible for selecting and approving the artist and artwork for Commission-sponsored projects in accordance with the process outlined in section 7 below.
d. Encourage public-private partnerships, including the raising of funds, to assure the survival of the arts in the Ross Valley.
e. Report projects, shows, future endeavors, etc. to the San Anselmo Town Council.
3. Goals:
Item 5 - Attachment 2
Item 5 - Attachment 2 1
157
a. Providing a structure to facilitate the creation of art in all disciplines in the community to provide enrichment and enjoyment for the public. b. Promoting and exhibiting art and cultural works produced by Ross Valley artists. c. Promoting art education in the community and supporting art education in the schools using art displayed as a community outreach project. d. Using funds raised by the Commission for the development and implementation of projects and programs that promote the purpose of the Commission. e. Establishing a relationship between artists and the local business community. f. Organizing local community resources to better serve local artists and art groups in the Ross Valley and its citizens.
4. Organization: Commission membership shall consist of seven (7) members appointed by the Town Council and shall serve without pay. The commission shall include up to two youth Commissioners appointed by commission. The Council shall consider, but is not restricted to, the following criteria in making appointments to the commission:
a. Residency in the Ross Valley. No more than four (4) members of the commission shall be non-residents of the Town.
b. Representation to include a wide range of residents, with a variety of art disciplines and ability levels on the Commission.
c. Availability of time to participate actively as a working member of the commission, and to represent a broad cross section of interests.
5. Guidelines: The guidelines for the commission are as follows:
a. The commission shall annually elect a chairperson, vice chairperson, secretary, and such other officers-as deemed necessary for the efficient functioning of the commission.
b. All meetings of the commission shall be held in accordance with the Ralph M. Brown Act.
c. Regular meetings shall be held no less frequently than quarterly at a scheduled time and place in the Ross Valley.
d. Except as herein limited, the commission shall follow Rosenberg's Rules of Order. e. The Commission may establish Ad Hoc Committees as it deems necessary to accomplish its goals and objectives.
6. Terms: Members will serve three (3) one-year terms, except when a member is appointed for a shorter period to fill the end of a vacated term. A goal is to stagger the appointment schedule so that no more than one-half of the seats shall expire in any one year. Any member who misses more than three (3) unexcused consecutive meetings will be removed from the commission.
7. Process for developing public art projects.
a. Review and approval of each project will occur through a multi-step process with the Arts Commission.
Item 5 - Attachment 2
Item 5 - Attachment 2
2 158
1. The Arts Commission will present a proposed project type and location to Town Council for a non-formal pre-approval.
2. The Arts Commission will work with Town staff and private property owners to establish objective guidelines for each project.
3. A sub-committee of the Arts Commission will work with property owners and any specific stakeholders to identify a project theme, create an Open or Invitational Request for Proposals, review proposals, develop a short list, and select an artist.
4. All neighbors within 300 feet of the proposed project location will be notified of the project at least ten (10) days before the Arts Commission considers approval of the project.
5. The sub-committee of the Arts Commission will present the selection to the full Arts Commission for approval.
6. Once a project is approved by the Commission it will undergo a staff review.
7. All projects on public or private property will be reviewed by the Planning Director or Planning Commission to ensure compliance with the sign ordinance and other relevant Town regulations.
8. The Town Council will review and approve the use of public property or review and approve the location on private property
b. The Arts Commission retains the right to terminate an agreement with the artist at any time based on a majority vote of the commission and subject to the terms of the agreement.
c. Within ten (10) days of a final decision by the Arts Commission, the project artist or applicant may appeal the decision to the Town Council by filing a written appeal and paying the Town’s appeal fee. Any appeal will be heard in the same manner as an appeal filed pursuant to San Anselmo Municipal Code section 1-4.01 et seq.
I hereby certify that the foregoing resolution was duly passed and adopted at the regular meeting of the San Anselmo Town Council on ______________, 2022, by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
Item 5 - Attachment 2
Item 5 - Attachment 2 3
159
1 June 29, 2022
San Anselmo Town Council Members
525 San Anselmo Avenue
San Anselmo, CA 94960
Dear Council Members:
This letter is our request and explanation for changing one section of the proposed Public Art Resolution, which has been revised by staff per the direction of the Town Council. The resolution includes a clause that provides a broad process for anyone to appeal the project after all approval steps have been followed. Given the rather lengthy process in place for approval (estimated 8 to 12 months in duration), the Arts Commission does not support this type of broad appeals process where anyone from the public can appeal an already approved project for any reason. We also did not find any precedents in other cities that allowed appeals for any reason. (see Background below)
During the Town Council meeting, we heard that Council members are concerned about an artist being removed from a project and not having any recourse. Town Council members suggested that artists should be able to appeal a decision by the Arts Commission to terminate the agreement. Town Council members also suggested that there should be a similar process for projects that the Arts Commission decides not to sponsor.
Given the comprehensive process detailed in Section 7 (a) of the proposed resolution amendments which includes outreach to stakeholders, neighborhood notification, review and approval by staff, the Planning Department and Town Council, this additional requirement for an appeals process will hinder the potential for public art in the Town of San Anselmo. The Arts Commission feels that including this clause would cause undo harm to our ability to apply valuable time and resources to any public art project.
Based on a request from the Town Council in February, staff developed the following proposal for an appeal provision for the resolution:
c. Within ten (10) days of a final decision by the Arts Commission, an interested party may appeal the decision to the Town Council by filing a written appeal and paying the Town’s appeal fee. Any appeal will be heard in the same manner as an appeal filed pursuant to San Anselmo Municipal Code section 1-4.01 et seq.
The Arts Commission is providing the following alternative appeal provision for the Council’s consideration:
c. Within ten (10) days of a final decision by the Arts Commission, the project artist or applicant may appeal the decision to the Town Council by filing a written appeal and paying the Town’s appeal fee. Any appeal will be heard in the same manner as an appeal filed pursuant to San Anselmo Municipal Code section 1-
4.01 et seq.
Item 5 - Attachment 3
Item 5 - Attachment 3
160
2 Background of Proposed Resolution
During the Town Council meeting on February 22, 2022, council members suggested that the Arts Commission provide precedent references for how Arts Commissions operate within other jurisdictions. We have taken this opportunity to provide background and research to Town Council for review and discussion. We also want to provide Town Council with a timeline of the efforts dedicated to expanding public art opportunities within the Town thus far.
As written on the Town website: “The goal of the commission is to add to the cultural character of Ross Valley through any form of artistic expression. The objectives include providing a structure to facilitate the creation of art in all disciplines in the community, promoting and exhibiting art and cultural works produced by Ross Valley artists and promoting art education in the community and schools.” The Town liaison for the Commission is the Recreation Department.
The Arts Commission is served by volunteers appointed by the Town Council and selffunded through the non-profit Friends of the Ross Valley Arts (FORVA). The Arts Commission currently functions as the sole entity in the Town for public art projects, including vetting proposals, funding, development process and project management.
Since inception in 1996, the Arts Commission has independently set an agenda for each year with projected project goals and identifying the necessary funding to reach the goals set forth. This process is discussed and voted upon, taking into account both physical and financial resources available to accomplish the projects. During the past three years, the Arts Commission has expanded its interests beyond music to include visual arts and youth projects. A few examples of recent successful endeavors include Youth Scholarships, Paintbox, Harmony Show in collaboration with Cedars, and Art on the Avenue.
Our research discovered that municipalities generally designate either a paid Public Art Administrator or assign those duties to a City department that can work in conjunction with an Arts Commission. Generally, there is one entity with the designated authority for public art projects, with final approval by a City Council. Given the small size of San Anselmo, we understand that resources are not available for this type of position. The Arts Commission has taken on the responsibility for acting as a sponsor of public art projects with responsibilities including planning, coordination with the Town, review, approval and implementation. In our research, we did not find any policies where a City Council overrides a Public Art Administrator’s or Arts Commission’s decision to not proceed with a project or artist.
Examples:
Item 5 - Attachment 3
Item 5 - Attachment 3
161
3 • In Mill Valley, CA, the Arts Commission's authority is outlined in their municipal code (section 2.08.090): "The Arts commission has the power and duty to make recommendations to the City Manager and final recommendation to the City Council on the ... 'request of any organization or group interested in artistic displays in any building, parks or other city facilities.' The Arts Commission would undertake steps for Funding, Site Selection, Artist Selection, Acquisitions, Program Administration, Documentation, Decommissioning, and Educational Opportunities." There is not any appeals process outlined; “…It is expected that the artist and/or design team will have worked with any stakeholder groups in developing the preliminary design prior to bringing it to the Arts Commission/Public Art Committee…Final design of the art work will be presented to PAC…(and) forwarded to the other relevant commissions and/or City Council.” (https://www.cityofmillvalley.org/400/Public-Art)
• San Rafael has recently approved a program for vetting public art projects. After a City Staff review for logistics, safety etc., a public art advisory board will make recommendations to the City Council based on a set of criteria. Applications will not require Design Review or Planning Commission approval prior to Staff review. If the Advisory Board (and any relevant community groups) approves the project, it goes to City Council for final approval. There is no outlined appeals process once a project receives final approval. https://www.marinij.com/2022/05/20/san-rafael-approvesprogram-for-vetting-public-art/ • In San Francisco, CA, where the Arts Commission is publicly funded, all public art acquisitions are under the final jurisdiction of the Arts Commission. Interested parties are welcome to attend meetings of both the Visual Arts Committee (who makes recommendations to the Arts Commission) and the Arts Commission, who is responsible for approvals by Resolution. There is not any explicit appeals process outlined in the “Murals Under Arts Commission Jurisdiction.” (https://sfartscommission.org/our-roleimpact/about-commission/policiesguidelines/public-art-commission-policies) • In Petaluma, CA, all Public Arts Committee decisions need approval by the City Council. Appeals by members of the public can be made "...upon determination that the proposed public art does not comply with the Public Art requirements of section 18.120 (Planning Code)... the determination may be appealed to the City Council... https://petaluma.municipal.codes/ZoningOrds/18.120
• In Selma, CA, the Director of Recreation and Community Services wrote, “We have a policy for structures and buildings throughout the City, which is used when the group would like to gain permission to place a mural on a business. In addition, any mural placed on a City building would require City Council approval following the review by our Arts Council as the owner. Been very nice in Selma with murals being completed.” • Further resources are listed in the Marin County Public Art Toolkit. (https://www.marincultural.org/public-art-toolkit)
Item 5 - Attachment 3
Item 5 - Attachment 3
162
4 On May 18, 2020, a San Anselmo property owner submitted an online form to the Town requesting a mural on their commercial building. The Town sent this request to the Arts Commission and we have received additional requests from other property owners during the past couple of years. Since it is the Commission’s understanding that murals are not currently allowed due to the sign ordinance, we have been working with the Town to create a process to allow murals sponsored by the Arts Commission and with our oversight. Below is a timeline of our efforts to date. • May/June/July 2020 – Arts Commission gathered information and developed ideas for a process to work with the Town on potential mural sites. • August 2020 – Arts Commission creates power point presentation to present to Town Council with ideas for mural process using precedent of Paintbox process. • September-December 2020 – Recreation Department reviews presentation and meets with Planning Department to discuss. Recreation Department consults Town Attorney and advises that sign ordinance will need to be changed before any mural projects can be considered by Town Council.
• January/February 2021 – Recreation Department advises that Pubic Art Resolution will need to address process prior to proposed revisions to sign ordinance will be considered. Arts Commission subcommittee begins working on revisions to Public Art Resolution revisions. Power Point presentation is updated. • March 2021 – Recreation Department informs Arts Commission that revisions to Public Art Resolution need to address all public art projects and not only murals. Arts Commission begins working on additional notes and steps that could apply to all public art projects in the Town.
• April-July 2021 – Town requests that we initiate a pilot project for a mural prior to revising the Public Art Resolution. Arts Commission begins working on potential locations for pilot project and how to fund.
• August 2021 – Arts Commission approves pilot project location and estimated budget.
Subcommittee begins working on process.
• September 2021 – Arts Commission is informed that pilot project cannot move forward until revisions to the public art resolution and sign ordinance have been adopted. • October 2021 – Arts Commission refines proposed revisions to public art resolution.
Recreation Department presents proposed revisions of public art resolution to Town Council.
• November 2021 – Recreation Department shares feedback from Town Council meeting regarding proposed revisions.
Item 5 - Attachment 3
Item 5 - Attachment 3
163
5 • December/January 2021 – Arts Commission meets with Recreation Department and Town Attorney to revise resolution to address concerns raised by Town Council. • February 2021 – Recreation Department presents proposed revisions of public art resolution to Town Council and Arts Commission answers questions from council members.
The idea of having murals on buildings was initiated by the community and the Arts Commission supports the idea of expanding opportunities for public art within the Town.
This is consistent with the charge and purpose set forth in Resolution No. 4283. We would also like to address several example scenarios that were brought up during the Town Council meeting in February.
EXAMPLES:
• Public Buildings & Property:
Publicly owned lands such as Town owned and maintained buildings and sidewalks would be first vetted by the appropriate Town department, ie. Public Works, before being considered for sponsorship by the Arts Commission. In this scenario, the Arts Commission would review the location and vote on whether they have the resources to support the project. If the Arts Commission decides to sponsor it, then the new proposed revisions to the public art resolution would require that these projects follow the process outlined in the document including pre-approval of the project by the Town Council, outreach, request for proposals, neighborhood notification, staff review, Planning review and approval, and presentation to Town Council for final approval. • Privately Owned Buildings & Properties:
Scenario 1: Painting & Decorating of Privately Owned Properties by Owner These self-funded and managed projects would continue as they do today. The Arts Commission does not plan to sponsor projects where the property owner wants to paint or decorate the exterior of their own building. This would fall under the review of the Planning Department. The Arts Commission does not have a role in this process.
Scenario 2: Murals or Other Types of Art on Private Property Owners that wish to have a mural painted on their building or artwork displayed that is visible from the public way and where the art may be partially or fully funded by the Arts Commission. (The Commission is currently developing a standard application form for proposing any public art project.) Arts Commission would review the location and vote on whether they have the resources to support the project. Once the project is approved, the new proposed revisions to the public art resolution would require that the project follow the process outlined in the document including pre-approval of project by Town Council, work with staff, owner and stakeholders, request for proposals, neighborhood notification, staff review, Planning review and approval, and presentation to Town Council for final approval.
Item 5 - Attachment 3
Item 5 - Attachment 3
164
6 We hope that this provides some background and clarification. And, we hope to use public art to enlarge our fostering of art and artists in the Ross Valley.
Sincerely,
San Anselmo Arts Commissioners
Item 5 - Attachment 3
Item 5 - Attachment 3
165
Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 6.
FROM:
David P. Donery, Town Manager
SUBJECT:
Town Council Committee Assignment Discussion
RECOMMENDATION
Discuss options for appointing Council members to serve on committees and provide direction to staff.
BACKGROUND
Town Council members serve on a variety of committees, some of which are internal to the Town and some of which are regional. It has been the Council's practice to review the list of appointments each year and make new appointments as desired or needed. This is normally taken up at a meeting after the Council reorganization.
During the 2022 appointment discussion, Council member Burke requested a future agenda item to discuss whether to change the current practice for Council committee assignments. She specifically asked that the Council explore the option of rotating committee assignments to each Council member.
DISCUSSION
Staff surveyed the towns and cities in Marin to determine how committee assignments are handled in each jurisdiction. Fairfax, Belvedere, Tiburon, Larkspur, Novato and San Anselmo currently do not have a rotation policy in place. All of the aforementioned jurisdictions, except Fairfax, address committee assignments for Council consideration after the reorganization meeting. Fairfax only considers Council assignments when a new council member is sworn in.
In Ross, Corte Madera and Sausalito, the Mayor has more control over the appointment process. In Ross, the Mayor checks with each Council member to see if they want to change the committees they are on, makes any necessary changes and then brings it to a Council meeting for final approval. In Sausalito and Corte Madera, the Mayor makes appointments to committees after the annual reorganization, but normally does not change a committee assignment unless there is a vacancy.
Staff researched committee appointment policies from other cities in California and found that the available written policies are similar to Ross and Sausalito with the Mayor having more control over the selection process.
Town of San Anselmo Page 1 of 3 Printed on 8/18/2022
powered by Legistar™166
TO: Town Council 8/23/2022 Item #: 6.
Municipality Policy
Belvedere Same as San Anselmo
Corte Madera The mayor designates committee appointments after Council reorganization.
Fairfax Only reshuffles committee assignments when a new Council Member is elected.
Larkspur Same as San Anselmo
Novato Same as San Anselmo.
Ross The mayor designates committee appointments after Council reorganization.
Sausalito The mayor designates committee appointments after Council reorganization.
Tiburon Same as San Anselmo.
OTHER Policy
Manhattan
Beach
The mayor designates committee appointments.
Claremont The mayor designates committee appointments.
Rohnert Park The mayor designates committee appointments.
San Carlos The mayor designates committee appointments.
Palo Alto The mayor designates committee appointments.
DISCUSSION OF OPTIONS
While staff was not able to find an example of a rotation of assignments policy, Council could consider establishing a rotation among a subset of committees. The rotation would need to be divisible by five, so that each Council Member would have the opportunity to serve for one year on each committee. This rotation would be impacted by the timing of the policy’s implementation and by the expiration of Council members’ terms. For example, if two Council members have only two years left in their terms and they do not seek reelection, they would serve one year each on two of the five committees.
During the meeting, the committees that were named by Council Member Burke and Mayor Fineman as committees of interest are as follows:
Central Marin Police Authority (CMPA) (2 members, 1 alternate) Ross Valley Fire Board (RVFD) (2 members, 1 alternate)
Marin Clean Energy (MCE) (1 member, 1 alternate)
Marin Wildfire Prevention Authority (MWPA) (1 member, 1 alternate) Transportation Authority of Marin (TAM) (1 member, 1 alternate) Please note, if the Council were to enact a rotation among these five committees, there is a chance that the committees could select chairs to their Boards based on seniority and not simply rotate through each jurisdiction. The Council may want to consider if those Board appointments would be accounted for in the rotation policy, so that someone with a Board position on a committee would remain in that position until the term of office on the Board expires.
The following options are available to the Council:
Town of San Anselmo Page 2 of 3 Printed on 8/18/2022
powered by Legistar™167
TO: Town Council 8/23/2022 Item #: 6.
1. Keep the committee assignment process the same as has been past practice.
2. Create a policy that will allow for the mayor to appoint the committee assignments after the Council reorganization meeting.
3. Create a policy that will allow for rotation of all committee assignments at chosen intervals or after every election. The committee assignments would need to be evenly dispersed among the Council members for a rotation list to work.
4. Create a policy that will allow for rotation of specific committee assignments every year or after every election. The specific committees will need to be identified by the Council and those committees would need to be evenly dispersed among the Council members for rotation.
FISCAL IMPACT
There would be no direct fiscal impact to the Town related to this item.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
Discussing a potential committee assignment policy is exempt from the California Environmental Quality Act (CEQA), under the “common sense” exemption, because it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. (Cal. Code Regs. tit. 14, § 15061).
Attachment 1 - Sample resolution submitted by Councilmember Burke Town of San Anselmo Page 3 of 3 Printed on 8/18/2022
powered by Legistar™168
The following document was submitted by Councilmember Eileen Burke for inclusion in Item 7 the May 10, 2022 Town Council meeting
RESOLUTION REGARDING ANNUAL TOWN COUNCIL COMMITTEE ASSIGNMENTS Town Council members are elected to four-year terms and sit on a variety of town, JPA, and regional commissions, committees and boards (hereinafter “committees”) that impact the interests of the Town, town residents, the greater region and the state. These committees address and govern a variety of issues including, but not limited to, housing, homelessness, sustainability, energy, recycling, regional planning, disaster preparedness, transportation, police and fire protection, and hiring and firing of employees.
Positions on these various committees provide Council Members the following individual benefits, which in turn, benefit the Town, residents and the larger region:
a) experience and knowledge;
b) the ability to impact and prioritize short and long term policy; c) contacts in the greater community;
d) a position to advocate to the benefit of the Town and town residents; e) control over budgetary decisions for essential services; and, f) working relationships with upper levels of the various county, state, regional and town organizations.
Though individual council members may have personal interests and reasons for wanting to be on a particular committee, personal reasons should be secondary to the overall benefit and interests of the Town.
The Town benefits and best serves Town interests by promoting, among all five council members, equal institutional knowledge, education and experience on the full spectrum of issues that come before the Council.
Concentration of institutional knowledge and experience in only a few council members can lead to a loss of institutional knowledge and experience, as when ITEM 6 - ATTACHMENT 1
1 ITEM 6 - ATTACHMENT 1
169
one or two council members who have remained on a committee for an extended period of time retire or are voted out of office.
Concentration of committee assignments in a few Council members and/or long term assignment of a single Council member to a particular committee, to the exclusion of other Council members, can also lead to an unequal sharing of control and decisions related to Town governance and an underutilization of the talents of all five Council members.
Committee attendance is a time commitment such that it is in the interest of fairness that all council members share the responsibility of sitting on the various committees equally.
In order to promote co-equality of council members with both depth and breadth of knowledge and experience, it is in the best interest of the Town to have Council members rotate committee assignments on a periodic basis. The benefits of rotation include:
1. Professional development of Council members;
2. Allowing Council members to utilize their individual skills in a variety of positions and committees;
3. Allowing more Council members the experience and knowledge necessary to fully evaluate issues pertaining to the Town;
4. Reducing the negative impact and lost institutional knowledge created by Council change through elections and retirement;
5. Reinvigoration of Council members and committees through rotation to new assignments and expanded networks;
6. Avoidance of any possible bias in favor of or against any particular Council member or committee;
7. Allowing sitting Council members who have left an assignment to mentor Council members new to an assignment thereby reinforcing knowledge continuity; and,
8. Allowing development of working relationships between all Council members and the long-term employees and agencies serving the Town and area.
ITEM 6 - ATTACHMENT 1
2 ITEM 6 - ATTACHMENT 1
170
THEREFORE:
To benefit the Town by ensuring both a depth and breadth of experience among Council members,
To reward seniority on the Council, and
To provide an equal opportunity for all Council members to serve on the various committees,
The following procedure will be implemented for annual assignment to committees:
Prior to annual assignments, the seated council will determine an order of seniority based on continuous number of years in office.
If Council members were first elected in the same election or have served for the same period of time, the member with more votes in the most recent election will be designated the senior member for purposes of seniority.
In order of seniority, reversed when the 5th member has made their selection, the Council members will select the committee they wish. Committee assignments will proceed in this manner (1-5, 5-1) until all assignments are selected.
Further, unless a particular committee has a designated shorter term limit, a member may not select the same committee for more than three consecutive years UNLESS no other member wishes to serve on said committee.
Council members who are appointed and assume the committee assignments of a departing councilmember shall not have the assumed assignments count toward the three consecutive years.
Alternates to committee assignments are not limited to number of years and do not count as a selection.
This procedure will begin with the assignment of committees in 2022 and, for the purpose of determining consecutive years, will incorporate the committee assignments for 2019, 2020 and 2021.
ITEM 6 - ATTACHMENT 1
3 ITEM 6 - ATTACHMENT 1
171
ITEM 6 - ATTACHMENT 1
4 ITEM 6 - ATTACHMENT 1
172
Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 7.
FROM:
Sean Condry, P.E., Public Works Director
SUBJECT:
Discussion of Potential Regulations Imposing an Electric Vehicle Infrastructure Training Program (EVITP) Certification Requirement for Town-Funded Electric Vehicle Infrastructure Projects
RECOMMENDATION
That Town Council receive the staff report and provide direction to staff regarding potential implementation of Electric Vehicle Infrastructure Training Program (EVITP) certification requirements for Town-funded electric vehicle (EV) infrastructure projects.
BACKGROUND
At the January 25, 2022, Town Council meeting, Council member Burdo requested that the Council consider requiring EVITP certification for Town-sponsored EV infrastructure projects. There was Council consensus to move forward with the conversation about this topic.
Assembly Bill 841, adopted in September 2020, added Section 740.20 to the California Public Utilities Code.
Among its provisions, the statute requires, with limited exceptions, that all electric vehicle charging infrastructure that is funded in part by the Public Utilities Commission, the Energy Commission, and the State Air Resources Board on and after January 1, 2022, be installed by a contractor with the appropriate license classification and at least one electrician on each crew who holds an EVITP certification. EVITP is a collaboration of industry stakeholders including automakers, electric vehicle charging station infrastructure manufactures, utility companies, and others, and provides training for the installation of EV charging stations.
To be eligible for EVITP training, a participant must be a state licensed or certified electrician. The training includes topics such as customer interactions, electrical code requirements, and EV supply equipment. To become certified, an electrician must take an 18-hour course and pass a 90-minute exam. The course and exam cost $275. Currently, there is one EVITP certified electrician in Marin County, located in Novato. 1 EVITP’s California course information is available at <https://db.evitp.org/addclient.php> 2 See EVITP website listing all certified contractors - <https://evitp.org/california?zoom=12&is_mile=1&directory_radius=100&keywords=&address=San%20Anselmo%2C%20CA%2C% 20USA&directory_radius=100¢er=37.9746458%2C-122.5616448&address_type=> Town of San Anselmo Page 1 of 2 Printed on 8/18/2022
powered by Legistar™173
TO: Town Council 8/23/2022 Item #: 7.
DISCUSSION
The Town Council may adopt an ordinance that imposes EVITP requirements similar to those contained in Assembly Bill 841 for Town-funded EV projects. The Cities of Petaluma and Rohnert Park have adopted such ordinances. Like those cities, the ordinance would amend the existing EV streamlining ordinance that was adopted by the Town in 2020 to add the
certification requirement for Town projects. (SAMC § 9-8.1 et seq.; see Rohnert Park Ordinance attached for reference (Attachment 1)).
For the foreseeable future, Town staff estimates that an EVITP certification requirement would apply to the planned installation of two EV chargers in Creek Park and two EV chargers in the Pine Street lot. In addition, the Town may consider installing four new chargers located along roadways (co-located at a streetlight) in the future.
FISCAL IMPACT
Adopting an EVITP certification requirement may increase the Town’s costs for locally-funded EV projects, because of the requirements for additional certification could decrease the pool of contractors available to perform the work. Publicly-bid projects already require licensed contractors to perform the work and this ordinance places additional certification requirements on those licensed contractors. However, because of the state requirements imposed through AB 841, local contractors are increasingly likely to have certified workers in the future.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The Town finds that discussion of the EVITP certification requirements is not a project under the California Environmental Quality Act (CEQA), because it does not involve an activity that has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment (Pub. Res. Code § 21065).
Adoption of an EVITP certification requirement for Town-funded EV projects is consistent with the Town’s Climate Action Plan because it will ensure that electricians who install chargers in Town lots are qualified to do so.
CONCLUSION
Staff seeks direction from the Town Council related to adoption of an EVITP requirement for Town EV projects.
Town of San Anselmo Page 2 of 2 Printed on 8/18/2022
powered by Legistar™174
ORDINANCE NO. 968
AN ORDINANCE OF THE CITY OF ROHNERT PARK, CALIFORNIA, REPEALING AND REPLACING CHAPTER 15.34, “ELECTRIC VEHICLE CHARGING STATIONS REVIEW AND INSTALLATION REQUIREMENTS” OF THE ROHNERT PARK
MUNICIPAL CODE
WHEREAS, the City is responsible for local enforcement of the California Building Standards Code; and
WHEREAS, the State of California and the City of Rohnert Park have consistently promoted and encouraged the use of fuel-efficient electric vehicles; and WHEREAS, Government Code Section 65850.7 requires local agencies to adopt an expedited and streamlined permitting process for electric vehicle charging systems; and WHEREAS, on September 17, 2017, the City Council adopted Ordinance 909, adding Section 15.34 to the Municipal Code, in order to comply with Government Code Section 65850.7; and
WHEREAS, AB 841, adopted in September 2020, among other things added Section 740.20 to the California Public Utilities Code, which section requires, with limited exceptions, that all electric vehicle charging infrastructure that is funded in part by the Public Utilities Commission, the Energy Commission, and the State Air Resources Board on and after January 1, 2022, be installed by a contractor with the appropriate license classification, as determined by the Contractors’ State License Board, and at least one electrician on each crew, at any given time, who holds an Electric Vehicle Infrastructure Training Program (EVITP) certification; and WHEREAS, on March 22, 2022, the City Council directed to staff to develop an ordinance that would require EVITP certification on city-funded projects, similar to the requirements of AB 841 for state-funded projects; and
WHEREAS, in order to implement the City Council’s direction, staff has reviewed Chapter 15.34 and is recommending that the City Council repeal and replace the section in order to provide for an updated electric vehicle charging station process that conforms to both City Council direction and best practices for streamlined permitting; and WHEREAS, maintaining an expedited, streamlined permitting process for electric vehicle charging stations facilitates safe and convenient charging of electric vehicles and help reduce the City’s reliance on environmentally damaging fossil fuels; and WHEREAS, nothing in this ordinance is intended to duplicate, contradict, or enter a field which has been fully occupied by state law, including the California Building Standards Code.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF ROHNERT PARK, CALIFORNIA, does hereby ordain as follows:
SECTION 1. FINDINGS
The City Council finds that:
A. A public meeting introducing the proposed amendments to the Municipal Code was held by the City Council on June 14, 2022.
Item 7 Attachment 1
Item 7 Attachment 1
175
Ordinance No. 968
2 B. In accordance with CEQA Guidelines, Section 15061(b)(3), this is not a project subject to CEQA in that there is no possibility that the activity in question may have a significant effect on the environment.
C. While it is clearly understood that the adoption of the amendments to the Codes and the adoption of Ordinances may not prevent the incidence of fire, it is noted the implementation of these various amendments will reduce the severity and potential loss of life and loss of property.
SECTION 2. CHAPTER 15.34
Rohnert Park Municipal Code as Chapter 15.34 is repealed and replaced in its entirety to read as set forth below.
Chapter 15.34 - Electric Vehicle Charging Stations Review Process
15.34.010 - Definitions.
The following words and phrases as used in this section are defined as follows:
A. “Electric Vehicle Charging Station (EVCS)” or “Charging Station” means any means any of the following:
a. Any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this Chapter, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
b. One or more electric vehicle charging spaces served by electric vehicle charger(s) or other charging equipment allowing charging of electric vehicles.
Electric vehicle charging stations are not considered parking spaces.
B. “Electric Vehicle (EV)” means an automotive-type vehicle for on-road use, such as passenger automobiles, buses, trucks, vans, neighborhood electric vehicles, electric motorcycles, and the like, primarily powered by an electric motor that draws current from a rechargeable storage battery, fuel cell, photovoltaic array, or other source of electric current. Plug-in hybrid electric vehicles (PHEV) are considered electric vehicles.
For purposes of the California Electrical Code, off-road, self-propelled electric vehicles, such as industrial trucks, hoists, lifts, transports, golf carts, airline ground support equipment, “Electric Vehicle (EV) Charger” means off-board charging equipment used to charge an electric vehicle.
C. “Electric vehicle (EV) charger” means off-board charging equipment used to charge an electric vehicle.
D. “Electric Vehicle Charging Space (EV Space)” means a space intended for future installation of EV charging equipment and charging of electric vehicles.
E. Electric Vehicle Infrastructure Training Program (EVITP) means the training program developed by automobile manufacturers, utilities, energy storage device manufacturers, electrical contractors, state and local electrical inspectors, the national fire protection agency and electrical workers that incorporates technical requirements, safety imperatives and performance integrity for the installation of Electric Vehicle Supply Equipment or EV Item 7 Attachment 1
Item 7 Attachment 1
176
Ordinance No. 968
3 charging stations, electric recharging points, charging points, as such program may be modified from time to time.
F. “Electric Vehicle Supply Equipment (EVSE)” means the conductors, including the ungrounded, grounded, and equipment grounding conductors and the electric vehicle connectors, attachment plugs, and all other fittings, devices, power outlets, or apparatus installed specifically for the purpose of transferring energy between the premises wiring and the electric vehicle.
G. “Specific, Adverse Impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
H. “Electronic Submittal” means the utilization of one or more of the following:
a. Electronic mail or email.
b. Through an online permitting system.
c. Facsimile.
I. “Electric Vehicle (EV) Checklist” means a document containing objective requirements for the installation of an electric vehicle charging station and a process for electronic submittal of permit applications. The content of the checklist requires the permit applicant to evaluate the features of the existing electrical service such as rating in amperes, system voltage, connected or calculated load, spare capacity in amperes, voltage and ampere rating of the electric vehicle supply equipment, circuit rating of the electric vehicle supply equipment, location of the electric vehicle supply equipment, if ventilation is/or is not required, and clearances of the charging equipment to comply with all applicable building and fire safety laws. The checklist also assists the applicant in confirming that the location of the electric vehicle supply equipment will comply with any vehicle clearance requirements in the City’s Zoning Ordinance.
15.34.020 - Purpose.
The purpose of this section is to provide an expedited, streamlined permitting process for EVCS as required by California Government Code Section 65850.7.
15.34.030 - Applicability.
EVCS legally established or permitted prior to the effective date of this chapter are not subject to the requirements of this chapter unless physical modifications or alterations are undertaken that materially change the size, type, or components of the EVCS in such a way as to require new permitting. Routine operation and maintenance shall not require a permit.
15.34.040 - EVCS requirements.
A. All EVCSs shall meet applicable health and safety standards and requirements imposed by the state and the city.
B. EVCSs shall meet all applicable safety and performance standards established by the California Electrical Code as modified by this Title, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing Item 7 Attachment 1
Item 7 Attachment 1
177
Ordinance No. 968
4 laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability.
C. Installation of electric vehicle charging stations and associated wiring, bonding, disconnecting means and overcurrent protection devices shall meet the requirements of Article 625, as may be subsequently modified, and all applicable provisions of the California Electrical Code.
D. Installation of electric vehicle charging stations shall be incorporated into the load calculations of all new or existing electrical services and shall meet the requirements of the California Electrical Code. Electric vehicle charging equipment shall be considered a continuous load.
E. Prior to submitting an application for processing, the applicant shall verify that the installation of an electric vehicle charging station will not have specific, adverse impact to public health and safety and building occupants. Verification by the applicant includes but is not limited to: electrical system capacity and loads; electrical system wiring, bonding and overcurrent protection; building infrastructure affected by charging station equipment and associated conduits; areas of charging station equipment and vehicle parking.
15.34.050 - Applications and required documents.
A. All applications will be subject to Chapter 15.04 General Provisions and Penalties of this Title.
B. All documents required for the submission of an expedited EVCS application shall be made available on the city's website.
C. Applications for EVCS permits, and any supporting documents, may be submitted by email, facsimile, or through an online permitting system.
D. An applicant's electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature.
E. The City Manager or designee shall implement an EV checklist with all of the requirements for which EVCS shall comply to be eligible for expedited review.
F. The EVCS permit process, standard plans and checklist shall substantially conform to recommendations for expedited permitting contained in the most in the most current version of the “Plug-In Electric Vehicle Infrastructure Permitting Checklist” of the “Zero-Emission Vehicles in California: Community Readiness Guidebook” as published by the Governor’s Office of Planning and Research, in effect at the time of permit application.
15.34.060 - Permit review and inspection requirements.
A. An application that satisfies the information requirements in the checklist provided under Section 15.34.050(e) and (f), as determined by the building official, shall be deemed complete.
B. If the building official receives an incomplete application, the building official shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.
Item 7 Attachment 1
Item 7 Attachment 1
178
Ordinance No. 968
5 C. Upon confirmation by the building official of the application and supporting documentation being complete, the building official shall review the application. The building official's review of the application shall be limited to whether the application meets local, state and federal health and safety requirements. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the EVCS will not have a specific, adverse effect on the public health or safety.
D. The building official may deny the building permit if the building official makes a finding based on substantial evidence that the EVCS could have a specific, adverse impact upon the public health and safety, and may require application for an conditional use under Section 17.25.010. Any conditions imposed shall be designed to mitigate the specific, adverse impact upon public health and safety at the lowest cost possible. The decision to deny the building permit and require an administrative permit may be appealed to the building board of appeals.
E. The city may not deny an application for a conditional use permit to install an EVCS unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing adverse impact.
F. Upon confirmation that the application is complete and that the EVCS will not have a specific, adverse impact upon the public health or safety, the building official shall approve the application and issue all the necessary permits and authorizations.
G. Any condition imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
H. The city shall not condition approval of an application on the approval of a propertyowner’s association, as defined in Section 4080 of the Civil Code.
I. EVCS are subject to inspection in accordance with applicable provisions of the California Building Code. Construction of the EVCS shall remain visible and able to be accessed for inspection until approved.
J. If EVCS fails inspection, a subsequent inspection shall be required by the building official.
15.34.70 – Contractor requirements for City-funded projects.
A. All electrical vehicle infrastructure work on projects which are constructed with funds provided or administered by the City, in whole or in part, shall be installed by contractors holding the appropriate license classification required by the Contractors State License Board, and electricians performing such work shall hold certification from the Electric Vehicle Infrastructure Training Program in accordance with the following:
1. All of the installation, commissioning, and maintenance of electric vehicle charging stations, equipment and related infrastructure (the “EV Work”) shall be performed in accordance with the following requirements:
Item 7 Attachment 1
Item 7 Attachment 1
179
Ordinance No. 968
6 a. At a minimum, one job-site supervisor or job-site foreman supervising the EV Work at each job site shall hold EVITP certification and be a licensed electrician.
b. The EV work shall be performed only by duly licensed electricians.
Apprentices may assist.
c. A minimum of fifty percent (50%) of the licensed electricians performing the EV Work on each job site shall hold EVITP certification. d. The ratio of journeymen to apprentices shall comply with applicable requirements under state law.
e. No EVITP certification shall be required of apprentices. f. All apprentices assisting on the EV Work shall be registered in an apprenticeship program compliant with California Department of Industrial Relations regulations and approved by the Division of Apprenticeship Standards, and which has a graduation rate of at least 60%.
2. Contractors performing EV Work shall maintain written or electronic records regarding the performance of EV Work including the names of all EVITP electrician(s) who performed the EV Work. Said records shall be made available to EVITP, and/or City upon request.
SECTION 3. SEVERABILITY
Should any section, subsection, paragraph, sentence, clause, or phrase of this ordinance be declared unconstitutional or invalid for any reason, such declaration shall not affect the validity of the remaining portions of this ordinance.
SECTION 4. EFFECTIVE DATE
This ordinance shall go into effect thirty (30) days after its adoption and shall be published or posted as required by law.
This ordinance was introduced by the City Council of the City of Rohnert Park on June 14, 2022 and DULY AND REGULARLY ADOPTED this 28th day of June, 2022 by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
CITY OF ROHNERT PARK
___________________________
Jackie Elward, Mayor
Item 7 Attachment 1
Item 7 Attachment 1
180
Ordinance No. 968
7 ATTEST:
Sylvia Lopez Cuevas, City Clerk
APPROVED AS TO FORM:
Michelle Marchetta Kenyon, City Attorney
Item 7 Attachment 1
Item 7 Attachment 1
181
Town of San Anselmo
Staff Report
525 San Anselmo Avenue
San Anselmo, CA 94960
TO: Town Council 8/23/2022 Item #: 8.
FROM:
David P. Donery, Town Manager
SUBJECT:
Discuss ongoing format for public meetings
RECOMMENDATION
That Council discuss the ongoing format for Town public meetings and provide direction to staff.
BACKGROUND
On March 17, 2020, the County of Marin issued a Shelter in Place Order due to COVID-19. Recognizing the need to promote social distancing while allowing local legislative bodies to continue operating during the emergency, Governor Newsom signed Executive Orders N-25-20 <https://www.gov.ca.gov/wpcontent/uploads/2020/03/3.12.20-EO-N-25-20-COVID-19.pdf> and N-29-20 <https://www.gov.ca.gov/wpcontent/uploads/2020/03/3.17.20-N-29-20-EO.pdf>, which suspended provisions of the Brown Act and similar rules regarding teleconferencing and electronic meetings. Under these orders all members of a legislative body were permitted to participate in a meeting electronically or by phone from any location without posting agendas or opening those locations to the public.
On April 14, 2020, the Town started holding virtual public meetings using the Zoom meeting format to allow for transparency and public participation during the COVID-19 pandemic.
On May 25, 2021, Council voted to work towards holding a Hybrid Format for Town Council meeting that would combine a virtual online component which allows continued virtual public participation and an inperson component.
On September 16, 2021, Governor Newsom signed AB 361
<https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202120220AB361>, extending the authority of public agencies to conduct meetings by teleconference, including video conference, during the COVID-19 pandemic. AB 361 is effective through January 1, 2024.
Beginning in October of 2021, each month the Council voted to continue holding a Virtual Format for Town Council and Town Commission and Committee meetings and to return at a later date to discuss implementing a Hybrid Meeting option.
At the March 22, 2022 Town Council meeting, the Council voted to begin holding meetings using a hybrid format in which Councilmembers could choose to attend either in-person or virtually with public participation Town of San Anselmo Page 1 of 3 Printed on 8/18/2022
powered by Legistar™182
TO: Town Council 8/23/2022 Item #: 8.
limited to virtual participation. At that meeting, Council directed staff to work with each of the Town’s boards, commissions and committees to establish the meeting format that the group would prefer.
DISCUSSION
At the March meeting, staff was asked to return to Council after three months to review the meeting format to decide whether to continue the current hybrid meeting format or choose a new format.
A. Meeting Options
The options available to the Council are as follows:
1. Continue to utilize a hybrid meeting format which allows for participation by elected/appointed officials and staff either in-person or virtually, with public participation remaining virtual.
2. Continue to utilize a hybrid meeting format for both elected/appointed officials and allow the public to participate in-person and virtually.
3. Return to in-person meetings only for elected/appointed officials and allow the public to participate inperson and virtually.
For options 1 and 2, the Council would need to determine that there would be an imminent risk for some Council members to attend in person and not for others for AB 361 to apply.
If the Council wants to utilize Option 3, but not cite imminent risk, normal Brown Act teleconferencing rules would apply. This means that a Council Member would need to post the agenda outside of the location where they would be attending the meeting and allow the public to join them during the meeting time. This location includes but is not limited to a residence, a hospital room, hotel room or family home, even if the location is outside of Town limits. This location would have to be printed on the agenda that is posted 72 hours before the meeting begins. Also, a majority of the Council will need to be present in the Council Chambers in order to conduct the meeting.
Boards, Commissions and Committees
AB 361 applies to all local legislative bodies, which include Town Commissions and Committees. The Council may choose to continue to allow each legislative body to make its own determination under the bill regarding virtual meetings or the Council may make the determination for those bodies.
B. Neighboring Jurisdictions
Staff requested information from the surrounding jurisdictions and as of the date this report was written:
§ Mill Valley is conc=ducting in-person meetings
§ Corte Madera and Ross are conducting in-person meetings with a virtual participation option § San Rafael is conducting meetings in-person and virtual with a 50% capacity limit (90 people) § Larkspur is conducting hybrid meetings (Council choice to come to Council Chambers of attend Town of San Anselmo Page 2 of 3 Printed on 8/18/2022
powered by Legistar™183
TO: Town Council 8/23/2022 Item #: 8.
virtually) with virtual public participation
§ Belvedere, Fairfax, Novato, Sausalito and Tiburon are conducting meetings virtually.
FISCAL IMPACT
There would be no fiscal impact for this item.
CEQA AND CLIMATE ACTION PLAN CONSISTENCY
Discussing the Town Council meeting formats is not a “project” under the California Environmental Quality Act, because it does not involve an activity which has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub. Res. Code § 21065).
CONCLUSION
In summary, staff will continue to strive to provide transparency and open meetings to Town residents. Staff recommends that the Town Council review the options above and if necessary, make the determination under AB 361 for future Town Council meetings and for all Boards, Commissions and Committees.
Town of San Anselmo Page 3 of 3 Printed on 8/18/2022
powered by Legistar™184