Cities Index.
Agenda packet

San Anselmo City Council
September 9, 2025

Document
Agenda packet
Meeting
September 9, 2025
Body
San Anselmo City Council
Original file
26.9 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

Tuesday, September 9, 2025 7:00 PM
In the Council Chambers at 525 San Anselmo Avenue, San Anselmo, CA 94960 Town Council
Agenda
Meeting held In-Person and via Zoom:
https://us02web.zoom.us/j/84750660335
Or Telephone: +1 669 900 6833 | Webinar ID: 847 5066 0335 How to Submit Comments Before the Meeting: Members of the public are encouraged to submit email correspondence to [email protected] or eComments on the Agendas and Meeting page before the meeting begins.

How to Participate During the Meeting: Members of the public will have the option to speak during the meeting through the Zoom application by using their phone or an electronic device.

For PC, Mac, or smart phone, Use Raise hand function when public comment for an item is requested. It is a button that is located at the top or bottom of your screen, based on your electronic device.

For landline phones, raise hand to be recognized with *9 Please be advised that those participating in the meeting remotely via Zoom do so at their own risk.

The Town Council regular meeting will not be cancelled if any technical problems occur during the meeting.

I. Interviews for the Planning Commission - 6:00 PM
Six (6) Interviews by Time, Attachment No. and Applicant Name (10 Minutes Each) Staff Report (DOC)
6:00 PM Attachment 1- Tara Ticknor- Application no Resume (PDF) 6:10 PM Attachment No. 2- Jacob "Jake" Shemano- Application w/Resume (PDF) 6:20 PM Attachment No. 3- Elizabeth Thomas- Application w/Resume (PDF) 6:30 PM Attachment 4- Paul Corning- Application w/Resume (PDF) 6:40 PM Attachment No. 5- Jennifer Asselstine- Application no Resume (PDF) Town Council Agenda September 9, 2025
1 1. Consent Agenda:

1.1 Approval of the Draft Minutes of the Regular Meeting of August 26, 2025

1.2 Accept Resignation of Greg Alsterlind from the Bicycle & Pedestrian Advisory Committee

1.3 Adopt a Proclamation Recognizing and Ratifying Youth Commissioners for 2025/26

1.4 Receive and File Report of Checks Issued, August 2025

1.5 Accept the Pedestrian Hybrid Beacon Project at Sir Francis Drake Boulevard and Saunders 6:50 PM Attachment 6- Tim Heiman- Application w/Personal Statement (PDF) Call to Order. Optional Pledge of Allegiance: The Mayor or a designated Council member will recite the Pledge of Allegiance for members of the Council and the public who wish to join in the recitation 7:00 PM
Open time for public expression.

The public is welcome to address the Council at this time on matters not on the agenda that are within the jurisdiction of the Council. Please be advised that pursuant to Government Code Section 54954.2, Council is not permitted to discuss or take action on any matter not on the agenda unless it determines that an emergency exists, or that there is a need to take immediate action which arose following posting of the agenda. Comments may be no longer than three minutes and should be respectful to the community.

Written Public Comment
Public Comment - Asselstine (PDF)
Public Comment - Page (PDF)
Public Comment - Crane (PDF)
Public Comment- Correspondence- Dardis (PDF)
Council requests for future agenda items.

Council committee liaison reports, questions and comments to staff; staff miscellaneous items.

Special Presentation. There are no Special Presentations.

The opportunity for public comment on consent agenda items will occur prior to Council discussion of the consent agenda. The Council may approve the entire consent agenda with one action. In the alternative, items on the consent agenda may be removed by any Council or staff member, for separate discussion and vote.

Staff Report (DOC)
Attachment 1- Draft Minutes of the Regular Town Council Meeting of August 26, 2025 (PDF) Staff Report (DOC)
Attachment 1- Greg Alsterlind Resignation (DOC)
Staff Report (DOC)
Youth Commissioners Proclamation (DOC)
Staff Report (DOCX)
Attachment 1 Check Report August 2025 (PDF)
Town Council Agenda September 9, 2025
2 Avenue and Authorize Staff to File a Notice of Completion

2. Public Hearing:

2.1 Public Hearing, Discussion, and Potential Adoption of an Ordinance Amending Title 9, Chapter 1 (Construction Codes) and Chapter 19 (Green Building Requirements) to Implement the 2025 Tier 1 CALGreen Building Code. This is not a “project” under CEQA (Cal.

Pub. Res. Code § 21065).

3. Council Business Items:

3.1 Consider Making Appointments to the Planning Commission. Appointing volunteers to serve on a committee is not a “project” under the California Environmental Quality Act (CEQA) because it does not involve an activity that has the potential to cause a direct or reasonably foreseeable physical change in the environment. (Cal. Pub. Res. Code Section 21065).

4. Closed Session
Staff Report (DOC)
In general, the following procedural order applies to public hearing items:
•Staff Presentation
•Town Council Questions
•PUBLIC COMMENT – limited to 3 minutes/person
•Town Council discussion/action
Staff Report (PDF)
Attachment 1- Draft Ordinance Redline (PDF)
Attachment 2- Application of the 2022 Studies to the 2025 Energy Code (PDF) Attachment 3- California Energy 2022 Cost-Effectiveness Study- Existing Single Family Building Upgrades (PDF)
Public Comment - Nate (PDF)
In general, the following procedural order applies to items of business:
•Presentation
•Town Council questions
•PUBLIC COMMENT – limited to 3 minutes/person
•Town Council discussion/action
Staff Report (DOC)
Attachment 1- Tara Ticknor- Application no Resume (PDF) Attachment 2- Jacob "Jake" Shemano- Application w/Resume (PDF) Attachment 3- Elizabeth Thomas- Application w/Resume (PDF) Attachment 4- Paul Corning- Application w/Resume (PDF)
Attachment 5- Jennifer Asselstine- Application no Resume (PDF) Attachment 6- Tim Heiman- Application w/Personal Statement (PDF) The following procedural order applies to Closed Session items:
•Mayor Announces Closed Session
•PUBLIC COMMENT – limited to 3 minutes/person
•Town Council moves to Conference Room to Convene Closed Session •Town Council Reconvenes in Open Session- Council Chambers to Report out on any Actions taken during Closed Session
Town Council Agenda September 9, 2025
3 4.1 Conference with Legal Counsel pursuant to Cal. Gov. Code § 54956.9 - Existing Litigation (National Opioid Settlement with Purdue (and certain of its affiliates) and the Sackler family) Conference with Legal Counsel pursuant to Cal. Gov. Code § 54956.9 - Existing Litigation (Secondary Manufacturers Settlements with Alvogen, Amneal, Apotex, Hikma, Indivior, Mylan, Sun, and Zydus)
Adjourn
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact Town Staff at email [email protected]. Notification at least 48 hours prior to the meeting will enable the Town to make reasonable accommodations to help ensure accessibility to this meeting.

Any writings or documents provided to a majority of the Town Council regarding any item on this agenda after the distribution of the original packet will be made available for public inspection at the public counter at Town Hall located at 525 San Anselmo Avenue.

Notice is hereby given that Council may discuss and/or take action on any or all of the items listed on this agenda.

If any of these matters above are challenged in court, you may be limited to raising only those issues you or someone else raised at any public hearing described on this agenda, or in written correspondence delivered at, or prior to, this Council meeting. Judicial review of an administrative decision of the Town Council must be filed with the Court not later than the 90th day following the date of the Council’s decision (Code of Civil Procedure Section 1094.6) Any item not under discussion before 10:00 p.m. may be continued to the next regular meeting. Next regular meeting is September 23, 2025.

Administration Department
Town Hall
525 San Anselmo Avenue
San Anselmo, CA 94960
(415) 258-4691
Town Council
Tarrell Kullaway, Mayor
Steve Burdo, Vice Mayor
Eileen Burke, Councilmember
Chantel Walker, Councilmember
Yoav Schlesinger, Councilmember
Staff
David Donery, Town Manager
Linda Kenton, Assistant Town Manager / Town Librarian
Jeff Zuba, Finance and Admin Services Director
Megan Holt Acevedo, Town Attorney
Serge Avila, Town Clerk
Heidi Scoble, Community Development Director
Sean Condry, Public Works Director
Mattie O'Grady, Community Services Director
Mike Norton, Chief of Police
Dan Mahoney, Fire Chief
Town Council Agenda September 9, 2025
4 DECLARATION OF POSTING
This Notice is posted in accordance with Government Code §54954.2(a) or §54956. Members of the public can view electronic agendas and staff reports by accessing the Town of San Anselmo website. Under penalty of perjury, this Agenda was posted to the public at least 72 hours prior to the meeting.

Town Council Agenda September 9, 2025
5 Item #: Interviews

STAFF REPORT
TOWN OF SAN ANSELMO Item #: Interviews
MEETING DATE: September 9, 2025
AGENDA TITLE: Conducting Interviews for the Planning Commission FROM: Serge Avila, Town Clerk
RECOMMENDATION: For the Town Council to conduct six (6) interviews for the Planning Commission
Below are a total of (6) applicants scheduled to be interviewed by the Town Council.

Interview
Time Name
Board, Committee or
Commission
6:00 PM Tara Ticknor Applicant Planning Commission
6:10 PM Jacob “Jake” Shemano Applicant Planning Commission 6:20 PM Elizabeth Thomas Applicant Planning Commission
6:30 PM Paul Corning Applicant Planning Commission
6:40 PM Jennifer Asselstine Incumbent Planning Commission 6:50 PM Tim Heiman Incumbent Planning Commission
The Council will have the opportunity to appoint four voting members to the Planning Commission later today.

FISCAL IMPACT
There would be no direct fiscal impact on the Town to approve this item.

CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The proposed appointment is not a “project” under the California Environmental Quality Act, because it does not involve an activity which has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub. Res.

Code § 21065).

ATTACHMENTS
6 Item #: Interviews
Attachment 1- Tara Ticknor- Application no Resume
Attachment 2- Jacob “Jake” Shemano- Application w/Resume Attachment 3- Elizabeth Thomas- Application w/Resume
Attachment 4- Paul Corning- Application w/Resume
Attachment 5- Jennifer Asselstine- Application no Resume Attachment 6- Tim Heiman- Application w/Personal Statement 7 Submit Date: May 24, 2025
First Name Middle
Initial
Last Name
Email Address
Home Address Suite or Apt
City State Postal Code
Primary Phone Alternate Phone
Town of San Anselmo, CA
Application for Appointment to a San Anselmo Board/Commission/Committee Profile
Occupation
Structural Engineer
Employer's Address
Which Boards would you like to apply for?
Planning Commission: Submitted
Number of years as resident of San Anselmo?
18 Number of years as a resident in Marin?
20 Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:

John Merten 415-721-0905 Scott Henderson (415) 521-0564 Kirsten Barre (415) 794-9001 Education Level Achieved *
College/University Degree
Interests & Experiences
Tara M Ticknor
Tara M Ticknor
8 Upload a Resume
You may attach other documentation which you
believe would be helpful to the Council in its
selection process.

I would be able to regularly attend the meetings of this Board/Commission/Committee.

Yes No
I would be available to attend additional meetings when they are necessary.

Yes No
I am familiar with the responsibilities and functions of this Board/Commission/Committee.

Yes No
I have attended meetings of the Board/Commission/Committee as a member of the public.

Yes No
List briefly, previous experience serving the public office, and/or civic commissions, boards, or committees:

N/a
Reasons for this appointment:

Extensive and valuable experience in the construction industry What are your qualifications for this appointment?
I have worked in the field of structural engineering for 25 years. I have worked on residential, commercial, and public projects. I am very familiar with the construction industry and how building and design impact communities. I have worked on projects in seismic and flood and WUI zones and am familiar with requirements of these projects.

Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?
Housing quantity and affordability and flooding of our downtown areas LinkedIn Profile
https://www.linkedin.com/in/taraticknor?
utm_source=share&utm_campaign=share_via&utm_content=profile&utm_medium=ios_app Tara M Ticknor
9 Please Agree with the Following Statement
I understand that I and all other applicants will be personally interviewed by the Town Council (or the entity overseeing the Steering and Short Term Committees) as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.

I Agree
E-Signature:

Tara Ticknor
Thank you for your interest in serving the Town of San Anselmo and its citizens. For further information, please contact the Town Clerk, [email protected] or 415-258- 4660.

Tara M Ticknor
10 11
12 13
Jacob “Jake” Shemano
| LinkedIn
1 EDUCATION
University of Southern California, Los Angeles, CA
B.S., Policy, Planning & Development – Urban Planning & Development, 2005 Cornell University, Ithaca, NY
Commercial Real Estate Certificate, 2020

LICENSES
California Department of Real Estate – Broker License (No. 01848976)

CORE COMPETENCIES
• Real Estate Development: 10+ years overseeing residential, mixed-use, and commercial developments nationwide. Deep expertise in entitlements, zoning, environmental review, directing consultants, budgeting, scheduling, and community engagement.
• Sales, Acquisitions & Leasing: Proven track record in negotiating purchase agreements, leases, termination agreements, completing due diligence investigations, title review, and managing escrow.
• Property & Asset Management: Managed large, diverse portfolios of apartments with expertise in rent control, fair housing laws, refining operating budgets, and vendor/staff oversight.
• Project Management: Experienced owners representative responsible for negotiating GC contracts, project oversight, budget management, schedule management, pay application review, and punch listing.
• Construction: Practical carpentry skills; proficient in reading blueprints, framing, finish carpentry, and painting.
• Technology: Microsoft Office Suite, Google Suite, Dropbox, DocuSign, Adobe Acrobat, tenant tracking databases.
14 Jacob “Jake” Shemano
181 Tunstead Avenue, San Anselmo, California
(415) 845-5768 | [email protected] | LinkedIn
2 PROFESSIONAL EXPERIENCE
United Growth – San Rafael, CA | Commercial Real Estate Development Development Manager | Sep 2023 – Present
• Oversee full lifecycle of commercial development projects from due diligence through tenant delivery.
• Manage entitlement processes, tenant selection, and landlord deliverables.

Abode Communities – Remote | Affordable Housing Development Senior Acquisitions Manager | Jan 2022 – Sep 2023
• Sourced and modeled new investment opportunities.
• Negotiated purchase, relocation, and termination agreements; led community outreach and entitlements.

Realtex, Inc. – San Francisco, CA | Multifamily Real Estate Development Development / Project Manager | Nov 2014 – Jan 2022
• Directed $55M in land acquisitions and secured entitlements for multiple highprofile developments. • Led tenant buyouts, consultant coordination, and city agency engagement.

Canyon Pacific Management – San Francisco, CA | Property Management Association Manager | Aug 2013 – Apr 2014
• Managed operations for nine condominium associations and a commercial property (286 units).

Chandler Properties – San Francisco, CA | Property Management, Sales & Leasing Property Manager / Investment Sales & Leasing Associate | Oct 2009 – Jan 2013 • Managed 15 multifamily properties (324 units) across San Francisco. • Successfully leased 250+ apartments.

AGI Capital – San Francisco, CA | Residential & Commercial Development Development Intern | May 2009 – Sep 2009
• Evaluated foreclosure investment opportunities.
• Assisted in the delivery of a self-storage facility.

Early Career – Carpentry & Construction Roles | 2001 – 2008 • Worked on residential renovations, houseboat construction, and luxury home builds in the San Francisco Bay Area.
15 16
17 18
Elizabeth Thomas
San Anselmo, CA 94960
RELATED WORK EXPERIENCE:

DoorDash, Inc. San Francisco, CA
Director, Real Estate Legal 2020 - present
● Established and built in-house real estate legal function to support rapid national expansion of multiple business units.

Manage transactions in North America for all business units including parcel delivery, quick convenience, personal delivery devices, drones and corporate. Asset classes include office, R&D, retail, warehouse, and land. ● Manage and train teams of outside counsel at multiple law firms, and internal attorneys and paralegals. ● Built infrastructure to streamline cohesive legal transaction management. Established portfolio-wide transaction standards and negotiating positions.
● Seconded to internal business unit to accelerate growth of real estate portfolio.

Uber Technologies, Inc. San Francisco, CA
Director, Real Estate Legal 2015 - 2020
● In-house commercial real estate attorney. Managed transactions in the United States for rideshare, autonomous vehicles, air mobility, food delivery, bikes and scooters, freight, and special projects. ● Collaborated with internal finance, insurance, facilities, procurement, business development and corporate groups to set guidelines and policies for leasing and transaction management.

Coblentz Patch Duffy & Bass LLP San Francisco, CA
Associate Attorney, Real Estate Group 2011 - 2014
● Commercial real estate attorney with San Francisco-based law firm ranked top tier real estate firm by Chambers USA. ● Drafted and negotiated office, industrial, retail, and ground leases, purchase and sale agreements, option agreements, listing agreements, easement agreements, and related documents. ● Notable Transactions: leasing office, warehouse and industrial properties for PG&E; leasing multiple new restaurant locations for Boudin Bakery as tenant; leasing portfolio of South Bay properties to technology companies for Equity Office Properties as landlord; leasing portfolio of industrial properties for Morgan Stanley as landlord.

Goulston & Storrs, PC Boston, MA
Associate Attorney, Real Estate Group 2006 - 2009
● Commercial real estate attorney with Boston-based law firm recognized by American Lawyer’s AmLaw 200 list. ● Practice included leasing, purchase and sales, development, land use, financing, and affordable housing. ● Notable Transactions: portfolio acquisition of forty-five commercial properties by Beacon Capital Partners from Equity Office Properties; local permitting matters for Blackstone Properties; leasing, acquisition, and permitting of Shire Pharmaceuticals corporate campus; leasing of build-to-suit headquarters for National Grid, certified LEED Platinum.

Simpson Asset Management Company Boston, MA
Vice President 2006 - 2011
● Managed property management company and leasing team for two office buildings in downtown Boston. ● Directed the sale of an office building and adjacent hotel in downtown Washington, D.C. to investment group led by national commercial real estate developer.

Shearman & Sterling LLP Menlo Park, CA
Corporate Paralegal – Capital Markets and Mergers & Acquisitions 1998 – 1999 ● Corporate paralegal for public offerings of equity and debt, mergers and acquisitions, and corporate advisory services. ● Notable Transactions: $325 million high-yield debt offering for Amazon.com, secondary public offering for E-Bay, Inc.

Vrolyk & Company LLC San Francisco, CA
Corporate Finance Analyst 1996 – 1998
● Member of six-person team providing merger and acquisition advisory and private equity and debt placement services.

Prepared financial analysis and valuations, client presentations, industry reports, and private placement memoranda.

EDUCATION:

Boston College Law School Newton, MA
Juris Doctor May 2006
Middlebury College Middlebury, VT
Bachelor of Arts in International Politics and Economics / French May 1996 19 20
21 22
Paul Corning
Clear Academy LLC – Cheyenne, WY (2013-2017)
Principal, Founder – Co-founded startup to develop mobile applications ● Developed Clear English app to help English language learners improve their pronunciation.

BMP Holdings LLC – San Francisco, CA (2007-2010)
CEO, Co-Founder – Co-founded startup to develop social editing technology. ● Developed Daily Paws, a consumer web site to support research in novel collaborative filtering techniques.

Springcreek Advisors LLC – Corte Madera, CA (2003 – 2009) Director – Joined to help transform a small investment advisory firm. ● Served as acting co-CEO, hired investment advisory and legal teams, recruited permanent CEO.

OpenDesign, Inc. – South San Francisco, CA (2000 – 2001) Director of Product Management – Experimental peer-to-peer networking startup.

NetSanity, Inc. – Redwood City, CA (1999 – 2000)
Director of Mobile Products – Internet applications for mobile phones.

Diamond Multimedia Systems, Inc. – San Jose, CA (1995 – 1999) Country Manager (1997 – 1999) – Managed Australia and New Zealand business for a leading manufacturer of personal computer peripheral hardware.
● Incorporated company in Australia, ran sales, marketing and advertising.

Product Line Manager (1997 – 1997)
● Defined and launched consumer hardware/software products..

Fakespace, Inc. – Menlo Park, CA (1993-1994)
Sales and Marketing Manager – Managed sales, wrote business plan for a VR display manufacturer.

SRI International – Menlo Park, CA (1988 – 1993)
Consultant to SRI – Worked for Sciences Division of a non-profit research institute. ● Worked with 3 research teams to win development projects, wrote org plan for $90 million business unit.

Education: University of California at Berkeley – Berkeley, CA (M.B.A.) Wesleyan University – Middletown, CT (B.A. – Philosophy) 23 24
25 26
Submit Date: Jun 23, 2025
First Name Middle
Initial
Last Name
Email Address
Home Address Suite or Apt
City State Postal Code
Primary Phone Alternate Phone
Town of San Anselmo, CA
Application for Appointment to a San Anselmo Board/Commission/Committee Profile
Occupation
Structural Engineer
Employer's Address
Retired
Which Boards would you like to apply for?
Planning Commission: Submitted
Number of years as resident of San Anselmo?
22 Number of years as a resident in Marin?
22 Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:

Alan Cascio 415-246-1783 Matt Brazler 415-271-5294 Nancy Grover 415-453-3549 Education Level Achieved *
Master's Degree
Interests & Experiences
Tim L Heiman
Tim L Heiman
27 Upload a Resume
I would be able to regularly attend the meetings of this Board/Commission/Committee.

Yes No
I would be available to attend additional meetings when they are necessary.

Yes No
I am familiar with the responsibilities and functions of this Board/Commission/Committee.

Yes No
I have attended meetings of the Board/Commission/Committee as a member of the public.

Yes No
List briefly, previous experience serving the public office, and/or civic commissions, boards, or committees:

Fund raising committees for our son's elementary and hight schools. Member of SA Planning commisison for almost 8 years in which I have served as Vice-Chair and Chair. I am the current Vice-Chair of the commisson.

Reasons for this appointment:

Since I am retired I have the time and wish to continue being involved in our community. I feel that the planning commission matches ny interests and professional experience.

What are your qualifications for this appointment?
My professional experience working with and undestanding complex code provisions. Also my experience working with other design professionals on residential and commerical projects.

Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?
The development of additional housing in our town by encouraging ADU's and multi-family housing and/or mixed use projects which are in conformance with SA's housing element and blend in with the surrounding neighborhood. As a planning commissioner I have suggested several changes to SA's developemnt code allowing smaller lot sizes and lot line adjustments to non-conforming lots to encourage housing. A second important issue is maintaining a vibrant downtown commercial district by assisting the developemnt of new businesses.

LinkedIn Profile
https://www.linkedin.com/in/tim-heiman-45563511
SA_Planning_Personal_Statement_-
6-23-25.pdf
Tim L Heiman
28 You may attach other documentation which you
believe would be helpful to the Council in its
selection process.

Please Agree with the Following Statement
I understand that I and all other applicants will be personally interviewed by the Town Council (or the entity overseeing the Steering and Short Term Committees) as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.

I Agree
E-Signature:

Tim L. Heiman
Thank you for your interest in serving the Town of San Anselmo and its citizens. For further information, please contact the Town Clerk, [email protected] or 415-258- 4660.

Tim L Heiman
29 Personal Statement
I have been a practicing Structural Engineer for over 40 years in the SF Bay Area. During that time I have consulted with Architects and Contractors on a wide variety of residential and commercial projects ranging from senior living facilities and affordable housing projects to hospitals and higher education projects. Thru my work I have gained an understanding of codes and planning issues such as setbacks, height limits, density bonuses and parking requirements. I also understand how development can impact the local community, both positively and negatively.

While not a licensed Architect, my undergraduate Architectural Engineering degree program included three years of pre-architecture and design classes. In addition, I have been exposed to many different types of building design over the years and have a sense when a proposed design fits in with the adjacent surroundings. As a LEED accredited professional, I also understand how the design and construction of the built environment can be done with minimal impact on the environment.

As a practicing Structural Engineer, I feel I can bring a unique perspective to the Planning Commission. While the impact to adjacent buildings due to structural issues are minimal on flatland development that is not necessarily the case on hillside development. Hillside excavations can create slope stability problems and alter drainage patterns both of which can affect neighbors. As a structural engineer, I understand these issues and have worked with Geotechnical and Civil engineers to mitigate these them.

Local Project Experience
During my career I have been the structural engineer many projects throughout the Bay Area including Marin and Sonoma Counties. I also designed my own home in San Anselmo. A partial list of my local projects include:
• Marin Health – Oak Pavilion Hospital Addition & West Wing Renovation • Kaiser Santa San Rafael - Various Renovation Projects • Kaiser San Santa Rosa - North Wing Addition & Medical Office Building • Villa Marin Retirement Residences, San Rafael
• Spring Lake Village Retirement Residences, Santa Rosa TIM L. HEIMAN, SE
30 September 5, 2025
To: San Anselmo Town Council
From Ross Asselstine
RE: “Show Us the Money”
A few of my recent cartoons referred to the Flood Zone as being in the positions of:
• Having no access to funds at an ATM. “Insufficient Funds” • Being broke and out of money. “The Money is Gone”
• Not aware that they have no funds to even do BB2 “The Emperor has no Clothes On” The last cartoon included a 23 page letter to the Chief Counsel of Marin County and the Director of the Department of Finance dated August 19. I will spare you from re-sending this document to you again. (If you really want another copy, please shout.)
I’ve had recent productive phone calls with MC that suggest the issues raised are very real. I’m under the impression that they may well conclude their review and assessment this month.

In short, the staff of the District has four problems:
1) They cannot use the tax funds from 1965 / 1983 maintenance agreements for anything but the maintenance of the concrete channel, dredging and levee works. This could pull $4M out of the budget
2) They have to fund all future maintenance of works they have built so far from the Flood Fee of 2007. That could be a VERY high number.
3) Because of items 1) and 2), it is clear to me they don’t have funds to demo BB2. 4) I will guess that after a clear-headed study, they are not going to be able to do much else with the small amount remaining. They are obligated to set aside the funds to maintain “stuff”.

The issue of “Flood Control” has always been divisive in this community; the projects are either unacceptable as a few were, or were the great range of just plain bad ideas that were not viable. The issue of BB2 is now creating great division within our town, meetings include raised voices, unanswered questions, bad feelings, more frustration and well, you list the rest.

It’s not in our collective interest to put the BB2 CLOMR issue on a future agenda if the District simply does not have the money to move forward with it. Why have another meeting until the District gets it’s fiscal house in order and clearly states that they do or don’t have the funds to cover all obligations? In essence, their panic and problems, should not create more panic and more problems in San Anselmo.

I strongly recommend that the Council direct SA staff to communicate this or a similar position to the District ASAP. “Show us the Money”
31 Outlook
Agenda 9/09 Open Time
From Garril Page (POP) <[email protected]>
Date Sun 9/7/2025 11:33 AM
To Town Council <[email protected]>; Serge Avila <[email protected]> CAUTION: External Sender
I tried to submit this for Open Time using eComment but not possible so I hope Serge can make this available to the Town Council, please?
Thank you,
Garril
________________________________________
In considering SAFRR/BB2/CLOMR,  I ask that the Council, please, remember the flood district has been aware of concerns about:

1.) SAFRR’s impact on the Creek Park redwoods since 2017,

2.) the discrepancy between FEMA low-reading models versus Stetson’s 2D models more in synch with high water marks of past floods since 2018,  and

3.) the toxic tank under BB2 platform since 2023.

I know the above to be true since I have emails documenting transmission of the information to the district and county.

Instead of being transparent and responding with information they must possess by now,  your questions are not answered nor are ours. Is the need to promote SAFRR so over-whelming that such evasion is justified?

There is a new and relevant county flood strategy of which you may be unaware.  The removal of concrete channel walls downstream of College of Marin (COM)  has begun.  An interesting change in the plan and county strategy is the apparent removal of proposed detention basin(s) in favor of high vacant land. The basin(s) were placed to catch sediment generated by increased volume and velocity of storm waters carried downstream by SAFFR and CMC FPMP, thus aiding maintenance of  such deposits.  Now, marches protective of surrounding land areas have been added instead.   In spite of increased O&M costs, this may be environmentally and politically wise:  preserve and protect settled neighborhoods with land temporarily vacant and thus, available for public enjoyment. 32 In case you cannot read the fine print,  the signage  says:” …Over time rising sea level drowns tidal marshes which become mudflats and then open water. To preserve important habitat, this project includes an area higher than the current tidal marshes that can transition to tidal marsh as sea level rises. This reach has special value because it is in a mixing zone fort tidal water from the Bay and fresh water from Corte Madera Creek…” Here is a clear indication the district is  aware of increasing marine intrusion and planning projects with that awareness in mind.

Perhaps San Anselmo should be equally aware?   All this fuss about daylighting 130 feet of covered creek is futile in view of the advancing Bay pushing those waters back at us. Especially when hydraulics, models, and residents’ flood insurance programs are at issue.  Spending Millions of dollars to flood downstream neighbors might be weighted against more meaningful uses of our dollars?
The redwoods of Creek Park and restoration of a beloved local gathering area matter to residents and the vitality of San Anselmo.  These are quality of life elements.  Why not preserve them? Yours truly,
Garril Page
33 34
Outlook
Town Council Meeting 9.9.25 Public Comments
From John Crane <[email protected]>
Date Tue 9/9/2025 12:49 PM
To Town Council <[email protected]>
Cc [email protected] <[email protected]>; Tarrell Kullaway <[email protected]>; Cyndie Martel <[email protected]>; Eileen Burke Contact <[email protected]>; Chantel Walker <[email protected]>; Yoav Schlesinger <[email protected]>; Steve Burdo <[email protected]>; Bill Kircher Jr. <[email protected]>; Elizabeth Robbins <[email protected]>; Julie McMillian <[email protected]>; DEREK Johnson <[email protected]>; Dave Donery <[email protected]>; [email protected] <[email protected]>; Mathew Salter <[email protected]>; Gabe Paulson <[email protected]>; Frank Egger <[email protected]>; Dave Donery <[email protected]>
1 attachment (76 KB)
Judd Goodman 9.9.25 .pdf;
CAUTION: External Sender
Please add my comments below and my attached letter to Judd Goodman to the written public comments for tonight's meeting. Thank you.
_______________
September 9, 2025
Mayor and Town Council of San Anselmo
Dear Mayor and Council Members.

I would like to call your attention to misinformation in the September 8th, 2025 Marin IJ article: San Anselmo council gets flood control project update
Judd Goodman's made the following statement which is untrue. “No homes would flood that don’t flood now — that is an important distinction — and no new properties would be added to the floodplain,” Goodman said.

I have lived in my home at 86 Sir Francis Drake Boulevard, for more than 30 years, and I have never flooded.

This includes the severe flooding in 2005. For the record, I live in the most impacted neighborhood that will see the greatest increase in Water Surface Elevation, and I only know. of one home that has been previously flooded.

Judd Goodman's claim is misleading, irresponsible and will harm many property owners. It will also increase the Town's potential liability if the CLOMR and BB2 removal proceeds.

I have requested that Judd Goodman send me any and all information he has supporting this statement and the list of the “no homes would flood that don’t flood now". I believe his statement is untrue, and I urge the Town Council to fully investigate his statement and review the documentation as well. The current mitigation efforts based on falsehoods and assumptions that are erroneous are not only unacceptable, but they are underfunded as well. As a result, the current flood control efforts need to cease immediately.

The County has long spread misinformation and made erroneous statements that have the potential to harm individuals and their properties.

Obviously, this is of great concern to impacted property owners such as myself. 35 Thank you for your attention to this matter.

Respectfully,
John Crane
86 Sir Francis Drake Boulevard, Ross, CA 94957
John Crane Films
415.847.5054
email: [email protected]
36 TO: Judd Goodman
FROM: John Crane
DATE: 9.9.25
Dear Judd:

Re: Marin IJ Article September 8, 2025, by Krissy Waite In the Marin IJ article entitled: San Anselmo council gets flood control project update it is reported that you made the following statement:
“No homes would flood that don’t flood now — that is an important distinction — and no new properties would be added to the floodplain,” Goodman said.

Is this accurate? If so, please send me a list of the “no homes would flood that don’t flood now” without delay. I would like to have it before my meeting with An Bartlett (Technical) and Kurry Foley (Assistant Directory) today at 5 PM regarding questions specific to my property.

For the record, my home did not flood in 2005, and it has never flooded in the more than 30 years I have lived here.

Thank you.

John Crane
86 Sir Francis Drake Boulevard, Ross, CA 94957
37 38
39 40
41 42
Item #: 1.1

STAFF REPORT
TOWN OF SAN ANSELMO Item #: 1.1
MEETING DATE: September 9, 2025
AGENDA TITLE: Approval of the Draft Minutes of the Regular Town Council Meeting of the August 26, 2025
FROM: Serge Avila, Town Clerk
RECOMMENDATION: For Council to consider the approval of the Draft Minutes of the Regular Town Council meeting of August 26, 2025.

ATTACHMENT:

Attachment 1- August 26, 2025 Draft Minutes
43 1
San Anselmo Draft Council Minutes
Regular Meeting
Town Council Chambers and via Zoom
Tuesday, August 26, 2025
Interviews for the General Plan Advisory Committee- High School Student Representative and Racial Equity Committee- 6:00 p.m.

The Council interviewed Isabel Little, June Greeley, Nico Less, Regina Deangelis, and Cassandra “Rene” Lopez
Call to Order: Optional Pledge of Allegiance- 7:00 PM
COUNCILMEMBERS PRESENT: Tarrell Kullaway (Mayor)
Steve Burdo (Vice Mayor)
Eileen Burke
Yoav Schlesinger
Chantel Walker
STAFF MEMBERS PRESENT: Dave Donery, Town Manager
Megan Acevedo, Town Attorney
Serge Avila, Town Clerk
Heidi Scoble, Community Development Director
Sean Condry, Public Works Director
Linda Kenton, Town Librarian
Open Time for Public Expression
Ms. Sue Saunders thanked staff and the Town Council for making San Anselmo a leader in the climate crisis.

Ms. Peggy Alamonto was concerned about what was going on at 60 Greenfield Avenue. The building remains vacant.

Ms. Flora Meyer stated the friendly vibe and historic character of San Anselmo has been compromised by the recent paid parking system.

Mr. Benedetto Chico, speaking on behalf of the Chamber of Commerce, stated neither the Chamber nor the majority of merchants were in favor of or asked for the new paid parking system. The system is complicated and not working.

Ms. Karen Mendelow, member of the Climate Action Committee, thanked the Library and the Public Works Department for supporting the Monarch Butterfly Habitat Project.

Ms. Mary Edwards stated she met an elderly woman who was very upset about getting a parking ticket. She is against the new parking system.

Ms. Lori Burlinger, business owner, stated she was opposed to the paid parking system. It should be repealed.

Ms. Belinda McGuire, merchant, was opposed to the paid parking system and stated empty 44 2
parking spaces equals empty stores.

Ms. Sara Robinson offered several recommendations if the parking system remains in place in terms of accessibility.

Mr. Jeff Kroot agreed with the comments made about the new parking system. It is not working and is hurting the businesses.

Ms. Doss stated she has a salon on San Anselmo Avenue and the new parking system is inconvenient for her clients. The times should be adjusted- two hours is not enough.

Ms. Linda Gridley stated San Anselmo is a charming Town and the new signs do not fit in- they are too industrial.

Mr. Pat Townsley, merchant, stated his business has been negatively impacted by the new parking system. The Town is losing Sales Tax Revenue.

Mr. Frank Gomez agreed that the paid parking system has negatively impacted the businesses.

Ms. Tanya Rodriguez stated the new paid parking system is degrading the charm of the Town.

Mr. Ben Lucassi stated he was neutral on the parking system but was concerned about the impact to the businesses.

Ms. Lori Sperling, business owner, stated the meters are a deterrent to parking.

Victor stated the Town does not need meters it needs enforcement.

Ms. Cary Mangely, merchant, stated the two-hour time limit is crazy.

Ms. Carlina Borg, merchant, was opposed to the new parking system.

Mayor Kullaway stated the Council will be discussing and taking action on the parking issue at the September 23rd meeting. The Economic Development Committee will be discussing this issue at its September 9th meeting.

Council requests for future agenda items; Committee liaison reports; questions and comments to staff; miscellaneous items
Councilmember Burdo reported he attended the Ross Valley Fire Board meeting; the Countywide Evacuation Drill is scheduled for September 6th; the Sidewalk CPR Demo was held on Saturday at Station 21; he attended the Central Marin Police Authority meeting; asked staff about the status of his January request regarding the timing of the Flood Horn.

Councilmember Burke reported she went to the PDD Hazard Awareness Warning Center (HAWK) in San Ramon; attended the Second Annual Baldy Dash and came in 90th out of 170! Councilmember Walker reported on information from Cal Cities; toured Station 20; the Best of Marin included San Anselmo businesses.

Councilmember Schlesinger reported on the recent Marin Wildfire Prevention Authority (MWPA) Board meeting; encouraged everyone to attend Ember Stomp; today is International Dog Day.

Mayor Kullaway announced the event at Stafford Lake honoring the sacred Tule reeds will be 45 3
held on September 14th.

Librarian Kenton invited everyone to the first San Anselmo Repair Fair in the Council Chambers on Saturday, September 13th from 1:00 p.m. to 4:00 p.m. She talked about the Halloween Costume Swap.

Public Works Director Condry stated staff will be making a presentation to the Council regarding on-going projects including the Robson Harrington paint job and the use of AI to run the Hub traffic signals.

Special Presentation
There are no Special Presentations.

1. Consent Agenda

1.1 Approved the Draft Minutes of the Regular Town Council Meeting of Tuesday, July 22, 2025 and Approved the Special Meeting Minutes of Wednesday, August 6, 2025

1.2 Received and Filed the Financial Report on Recreation Fund ending July 31, 2025

1.3 Received and Filed Revenue and Expenditure Reports, July 2025

1.4 Received and Filed a Report of Checks Issued for the Month of July 2025

1.5 Approved an Agreement with Sleepy Hollow Fire Protection District and Approved for Contribution Toward Fire Station 20 Renovation Project

1.6 Approved Notice of Completion for Robson House Exterior Repairs and Repaint

1.7 Adopted Resolution No. 2025-4595 Approving a Publicly Available Pay Schedule in Accordance with California Public Employees Retirement Systems (CalPERS) Regulations

1.8 Response to Marin County Civil Grand Jury Report: The Worrisome Future of Marin Housing- NIMBY Resistance Takes a Backseat to Economic Reality

1.9 Accepted the Committees’ Decision to Conclude Christiana Conser’s membership on the Open Space Committee

1.10 Received and Filed Tax Equity Rebate Program Overview and 2025 Rebate Summary Councilmember Burdo stated he want to pull item #1.5 for discussion Councilmember Walker referred to item #1.8 and asked staff for an update at a future meeting.

M/s, Burdo/Burke, Motion to approve the Consent Calendar with the removal of item #1.5.

AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway

1.5 Approved an Agreement with Sleepy Hollow Fire Protection District and Approve for Contribution Toward Fire Station 20 Renovation Project
Councilmembers Burdo, Burke, and Walker thanked everyone involved. 46 4
M/s, Burdo/Walker, Motion to approve Consent Calendar item #1.5.

AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway Council Business

2.1 Consider Making Appointments to the Bicycle & Pedestrian Advisory Committee, General Plan Advisory Committee, and Racial Equity Committee
Town Clerk Avila presented the staff report. Staff answered questions from the Council regarding the appointment of alternate and non-voting members; Councilmember Walker spoke about the process for keeping candidates who are not selected interested in future vacancies.

Mayor Kullaway opened the meeting to public comments.

Mr. Frank Gomez supported Cassandra Lopez for the Racial Equity Committee position.

Mayor Kullaway closed the meeting to public comments.

M/s, Burke/Walker, Motion to appoint Ken Husband to the Bicycle & Pedestrian Advisory Committee.

AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway M/s, Walker/Burdo, Motion to appoint Nico Less to the General Plan Advisory Committee as the Youth Commissioner.

AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway M/s, Walker/Burdo, Motion to re-appoint April Hewes, Navruz Avloni, Tiffany McElroy, and Frank Gomez to the Racial Equity Committee
AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway M/s, Burdo/Walker, Motion to appoint Cassandra Lopez to the Racial Equity Committee AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway

2.2 Designate a Voting Delegate and Alternate(s) for the League of California Cities Annual Conference October 8-10, 2025
Town Clerk Avila presented the staff report. There were no questions from the Council.

Mayor Kullaway opened the meeting to public comments.

There were no comments.

Mayor Kullaway closed the meeting to public comments.

M/s, Burke/Walker, Motion to designate Vice Mayor Burdo as the voting delegate and Councilmember Walker as the alternate for the League of California Cities Annual Conference October 8-10, 2025.

AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway The Council took a brief break at 8:26 PM
The Council reconvene in the Council Chambers at 8:28 PM

2.3 Receive the County Flood Control District update on the San Anselmo Flood Risk 47 5
Reduction Project
Town Manager Donery and Public Works Director Condry presented the staff report. Chris Blunk Interim Public Works Director, and Judd Goodman, Senior Civil Engineer for the County Flood Control and Water Conservation District gave a PowerPoint presentation that included the following: 1) Building Bridge 2 Removal; 2) Conditional Letter of Map Revision (CLOMR) Application; 3) Flooding Process; 4) Storm Scenarios; 5) Expected Benefit to Homes and Businesses; 6) Town and Community Comments; 7) Proposed Mitigations; 8) CLOMR Process Evaluation; 9) Two Flooding Sources; 10) Rise in Creek Floodwater if BB2 Removed; 11) Example of Proposed Mitigation-Garage; 12) FEMA Required Letters Sent if Possible Change to Flood Map; 13) What Happens Beyond the Project Study Limits? 14) Conclusions of BB2 Removal; 15) Flood Model Differences; 16) Tree Management Plan; 17) Trees Adjacent to BB2; 18) Project Modifications Proposed to Protect Trees; 19) Tree Monitoring During Construction; 20) Tree Monitoring After Construction; 21) Flood Zone 9: 3 Revenue Sources; 22) Flood Zone 9 Project Funding; 23) Flood Zone 9 Operations & Maintenance Funding; 24) Next Steps; 25) Public Outreach Efforts Under Way; 26) BB2 Removal Project- Challenges. Staff and the consultants answered questions from the Council regarding whether the 1-D or 2-D model was used when talking about the number of structures and properties affected; if flooding is currently touching the 22 of the 38 affected structures and if there are proposed mitigation measures; if the pressure of additional water would impact these structures; if there is an increase in flood water in the 1-D or 2-D model; if the 2-D model used the 4% change of flood event scenario; if they have to use the 1% for FEMA purposes; how the Environmental Impact Report (EIR) applies to the 1-D model that FEMA uses and whether they need to prepare a new EIR; the timeline for the “apples-to-apples” comparison; why a short-turn around was needed for the letter of concurrence; how the district plans to improve its communication to the public; how the owners of the impacted properties were notified and if the district has met with them; if there is an increase in the number of affected properties when using the 2-D model and considering the 100-year flood; if there is a budget for mitigation work for the number of affected parcels shown in the 1-D model; the efficacy of the project using the 2-D model; if there is funding for using eminent domain if a homeowner refused mitigation; if refusal by one affected homeowner could kill the project; if the current Fund Balance was around $12 million; if there is a method for a homeowner to contest a determination regarding mitigations; challenges facing the project not included in tonight’s slide presentation; when the district would return to the Council for feedback; if the district could look at the feasibility of accessing the plaza.

Mayor Kullaway opened the meeting to public comments.

Mr. Jeff Kroot stated three of the four structural reports say the bridge is fine. The fourth report says it is fine but could collapse during a major earthquake. Demolishing the bridge will cause flooding downstream and liability to the Town.

Ms. Benedetto Chico, speaking as a business owner, stated this process has taken a very long time. Residents want this area opened up and used by the public. The county should have answers to resident’s questions.

Mr. Keith March stated he lives downstream on Sir Francis Drake Boulevard in the affected area. His home and office would not be affected by a flood but he has an access bridge running over the creek. He is concerned about his safety. The Winship Bridge needs to be fixed before BB2 is removed.

Mr. Pat Townsley, owner of Creekside Pizza, wanted the fence removed. He understood that the Winship Bridge was the first project that needed to go and that there would be upstream mitigation. They need to look at the bigger picture and the other bridges that make up the flood system.
48 6
Ms. Jennifer Motta, 82 Sir Francis Drake Boulevard, stated her home will be impacted by the rise in the base flood elevation. This project will harm her property and many others.

Mr. Philip Chidos stated he owns two commercial properties in the flood zone. There are County resources that are unaccounted for with no real return on investment (ROI).

Ms. Rosanne dalBello stated her arborist report does not agree with the one submitted by the County with respect to the Tree Management Plan. She discussed some of the discrepancies between the Tree Management Plan and the engineering drawings.

Mr. Ford Greene stated at a Flood Zone 9 meeting in 2022 it was estimated that the mitigations costs would be between $3 million and $11 million. It is now $400,000. It would hurt the property owners to try to make the project viable by reducing the cost of mitigation.

Ms. Paula Spencer, a business owner, asked the Council to deny the County permit for the demolition of BB2.

Ms. Ann Politzer stated tonight’s CLOMR presentation has changed from the one she heard at the Ross Town Council meeting. The asserted benefits are restricted to the 10-year flood and represent a 14% reduction in damages and losses. This is a lousy return on a $58 million investment.

Mayor Kullaway closed the meeting to public comments.

Councilmember Burdo thanked everyone for his or her testimony. He heard some new information tonight. He looks forward to seeing the “apples to apples” comparisons using the models.

Councilmember Burke stated tonight’s presentation raises more questions than it answered.

She is concerned about how receptive homeowners will be to the mitigation offers. This is the key to the project. She would like to see the 2-D model run for the 100-year flood and the fence removed as soon as possible.

Councilmember Walker stated the consultants talked about changes and that would be useful to see in the future.

Councilmember Schlesinger discussed the “different tools for different rules” approach. This approach is misleading because a model is not only a tool but also defines what we see. He would like to see the “apples to apples” comparison as soon as possible.

Mayor Kullaway was concerned about the legal liability for San Anselmo. There are a lot of good things and concerning things about the project.

M/s, Burke/Walker, Motion to adjourn the meeting at 10:38 p.m.

AYES: Burdo, Burke, Schlesinger, Walker, Mayor Kullaway Respectfully submitted,
Toni DeFrancis,
Recording Secretary
49 Item #: 1.2

STAFF REPORT
TOWN OF SAN ANSELMO Item #: 1.2
MEETING DATE: September 9, 2025
AGENDA TITLE: Accept the Resignation of Greg Alsterlind from the Bicycle & Pedestrian Advisory Committee
FROM: Serge Avila, Town Clerk
RECOMMENDATION: For the Council to accept the resignation of Greg Alsterlind and direct staff to recruit to fill the vacant positions.

BACKGROUND:

On August 25, 2025, Town staff received written notice from Greg Alsterlind, resigning from his position on the BPAC. The Bicycle & Pedestrian Advisory Committee deeply appreciate Greg’s contributions and unwavering dedication and extend their sincere thanks for his service.

With this resignation, the Council may direct staff to begin recruiting and fill the vacancy.

FISCAL IMPACT
None.

CEQA AND CLIMATE ACTION PLAN CONSISTENCY
Accepting the boards, committees, and commissions' resignations is not defined as a project under CEQA (Section 15378 CEQA Guidelines).

ATTACHMENTS
Attachment 1- Greg Alsterlind Redacted Email
50 From: Greg Alsterlind
Date: August 25, 2025 at 3:51:29 PM PDT
To: Scott Schneider <[email protected]>
Subject: BPAC resignation
CAUTION: External Sender
Scott- after four years of serving and learning the time it takes to be useful, I have to step aside. Please let the group know my position is available. Thank you for all of your support. I believe you have been a great find for this town and I you continue with your success. Best
Greg
51 Item #: 1.3

STAFF REPORT
TOWN OF SAN ANSELMO Item #: 1.3
MEETING DATE: September 9, 2025
AGENDA TITLE: Adopt Proclamation to Welcome, Recognize and Ratify Youth Commissioners for the Year 2025/26
FROM: Administration
RECOMMENDATION: For Town Council to Consider Adopting a Proclamation Recognizing and Ratifying All Town Youth Commissioners for the Year 2025/26

BACKGROUND
The Town of San Anselmo annually promotes the opportunity to become a Town of San Anselmo Youth Commissioner. Youth Commissioners serve as full voting members on a wide variety of Town Committees for one full year from July to June of the following year. During this time Youth Commissioners have the opportunity to serve their community, represent the school they’re currently attending, learn about municipal government, and boost their college applications.

DISCUSSION/ANALYSIS
The following Youth Commissioners have been interviewed and appointed by and to the various boards, committees, and commissions:

Youth Commissioners for 2025/26
Board, Committee, Commission
Youth Commissioner
Name:

Arts Commission Julia Wise
Hanna Janson
Esme Charles
Ryan Cunningham
52 Item #: 1.3
Bicycle and Pedestrian Advisory
Committee Jack DeNitto
Liam Rosenbaum
Climate Action Commission Ainsley Sullivan
Isaac Terry
General Plan Advisory
Committee Nico Less
Historical Commission Charlie Fee
Stella Gueits
Library Advisory Board Campbell Stoughton
Open Space Claier Palmer
Nico Less
Parks & Recreation Commission Liam Rosenbaum
Molly Ehrlinspiel
Max Brasler
The Town of San Anselmo would like to welcome and ratify all Youth Commissioners, acknowledging their volunteer community service as an integral part of the Town's operations.

FISCAL IMPACT
None

CEQA AND CLIMATE ACTION PLAN CONSISTENCY
Adopting a proclamation to recognize the 2025/26 Town Youth Commissioners is not a “project” under the California Environmental Quality Act, because it does not involve an activity that has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub. Res. Code § 21065).

ATTACHMENTS
Attachment 1- Proclamation
53 PROCLAMATION
The Town of San Anselmo is pleased to welcome and recognize

YOUTH COMMISSIONER
FOR 2025-2026
WHEREAS; the Town of San Anselmo annually promotes the opportunity to become a Youth Commissioner; and
WHEREAS; Youth Commissioners serve as full voting members on a wide variety of Town Boards, Commissions, and Committees; and WHEREAS; Youth Commissioners commit to a one-year term, starting on the month of July and ending in June of the following year; and WHEREAS; Youth Commissioners have the opportunity to serve their community, represent the school they’re currently attending, learn about municipal government, and to boost their college applications; and WHEREAS; the Town of San Anselmo’s Boards, Committees, and Commissions have interviewed and appointed more than ten Youth Commissioners for the current year;
NOW, THEREFORE, be it proclaimed, that the Town of San Anselmo, in appreciation of all Youth Commissioners’ devotion and service to our Town, desires that there should be a public record of recognition for their community service.

IN WITNESS WHEREOF, I have hereunto set my hand this 9
th day of
September, two thousand twenty-five.
_______________________________________
Tarrell Kullaway, Mayor
54 Item #: 1.4

STAFF REPORT
TOWN OF SAN ANSELMO Item #:1.4
MEETING DATE: September 9, 2025
AGENDA TITLE: Report of Checks Issued, August 2025
FROM: Jeff Zuba, Finance & Admin Services Director
RECOMMENDATION: That the Town Council acknowledges, and files warrant numbers 100258 to 100384 issued during the month of August and bank draft numbers DFT06290-DFT06297, DFT06300-DFT06303, and DFT06325in a total amount of $,2,793,906.99.

BACKGROUND
This report is an itemization of payments made to vendors during the months of August 2025. It also includes wires to Bank of America for August 2025 payrolls, including payments for retirement and health benefits. The Bank of America account is used for payroll-related items.

The following warrants were voided or canceled in August 2025: 100262 and 100265 .

ATTACHMENTS
Attachment #1: Check Report August 2025
55 9/2/2025 12:34:15 PM Page 1 of 22
Check Report
Town of San Anselmo By Check Number
Date Range: 08/01/2025 - 08/31/2025
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Bank Code: AP-AP - OPERATING POOL
03521 Acumen Industrial Hygiene, Inc. 08/07/2025 100258 Regular 0.00 1,400.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount TSA2506 Invoice 03/17/2025 03.17.2025 - DEBRIS CONTAINMENT AND 0.00 1,400.00

15.41.63117 CONSTRUCTION - BUILDI 03.17.2025 - DEBRIS CONTAINM 1,400.00 03778 Adelso Rodas 08/07/2025 100259 Regular 0.00 1,500.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount R16237 Invoice 08/04/2025 08.04.2025 - REFUND - ROAD BOND 441 L 1,500.00 0.00

01.00.20314 ROAD BOND 1,500.00 08.04.2025 - REFUND - ROAD B 02986 Albertsons/Safeway 08/07/2025 100260 Regular 0.00 220.24 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 435109-063025-1 Invoice 06/30/2025 06.30.2025 - REC - CAMPKIDMARIN MINI 0.00 15.59

21.63.62985 CAMP KIDMARIN MINI S 06.30.2025 - REC - CAMPKIDMA 15.59 435443-070225-1 Invoice 07/02/2025 07.02.2025 - REC DEPT - CAMPKIDMARIN 0.00 50.27

21.63.62985 CAMP KIDMARIN MINI S 07.02.2025 - REC DEPT - CAMPK 50.27 805427-070925-1 Invoice 07/09/2025 07.09.2025 - REC DEPT - CAMPKIDMARIN 0.00 82.96

21.63.62985 CAMP KIDMARIN MINI S 07.09.2025 - REC DEPT - CAMPK 82.96 806511-070925-1 Invoice 07/09/2025 07.09.2025 - REC - CAMPKIDMARIN MIGH 71.42 0.00

21.63.62984 CAMP KIDMARIN MIGHT 71.42 07.09.2025 - REC - CAMPKIDMA 02920 Amazon Business 08/07/2025 100261 Regular 0.00 4,376.80 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 134L-DF71-4GN7 Invoice 07/23/2025 07.23.2025 - REC - CAMPKIDMARIN SUPP 75.65 0.00

21.63.62985 CAMP KIDMARIN MINI S 75.65 07.23.2025 - REC - CAMPKIDMA 13F4-YCWY-DWR Invoice 07/28/2025 07.28.2025 - REC - CAMPKIDMARIN MIGH 315.96 0.00

21.63.62984 CAMP KIDMARIN MIGHT 315.96 07.28.2025 - REC - CAMPKIDMA 13RT-X7N6-CHNY Invoice 07/29/2025 07.29.2025 - REC - MADDIE PINO GIFT BA 73.17 0.00

21.64.61185 SPECIAL EVENT EXPENSE 73.17 07.29.2025 - REC - MADDIE PIN 17C1-W1RJ-FPVK Invoice 07/12/2025 07.12.2025 - ST&PK - ANTI RUST SPRAY 57.78 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 57.78 07.12.2025 - ST&PK - ANTI RUST 17RC-313C-VGNC Invoice 07/16/2025 07.16.2025 - ST&PK - A FRAME SIDEWALK 0.00 954.60

60.14.62903 LIVE ON THE AVENUE 07.16.2025 - ST&PK - A FRAME 954.60 1FKC-DMR6-DC9 Invoice 07/29/2025 07.29.2025 - REC - CAMPKIDMARIN MIGH 177.15 0.00

21.63.62984 CAMP KIDMARIN MIGHT 177.15 07.29.2025 - REC - CAMPKIDMA 1HH4-GYY9-693C Invoice 08/04/2025 08.04.2025 - REC - CAMPKIDMARIN MIGH 415.17 0.00

21.63.62984 CAMP KIDMARIN MIGHT 415.17 08.04.2025 - REC - CAMPKIDMA 1KKF-T64D-63FY Invoice 08/04/2025 08.04.2025 - REC - CAMPKIDMARIN MIGH 274.32 0.00

21.63.62984 CAMP KIDMARIN MIGHT 274.32 08.04.2025 - REC - CAMPKIDMA 1KXW-11K4-1HD Invoice 07/23/2025 07.23.2025 - REC - ROBSON SUPPLIES 375.44 0.00

21.63.61187 ROBSON AFTER SCHOOL 07.23.2025 - REC - ROBSON SUP 375.44 1PMN-7RT1-1TK1 Invoice 08/03/2025 08.03.2025 - REC - CAMPKIDMARIN MIGH 365.33 0.00

21.63.62984 CAMP KIDMARIN MIGHT 365.33 08.03.2025 - REC - CAMPKIDMA 1PMN-7TR1-GHV Invoice 08/04/2025 08.04.2025 - LIB - THERMAL CAMERA 180.25 0.00

27.71.62200 DEPARTMENTAL SUPPLIE 180.25 08.04.2025 - LIB - THERMAL CA ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
56 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 2 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number 1PNG-9VTF-DPRP Invoice 07/28/2025 07.28.2025 - REC - CAMPKIDMARIN MIGH 226.89 0.00

21.63.62985 CAMP KIDMARIN MINI S 226.89 07.28.2025 - REC - CAMPKIDMA 1Q1P-RWJG-96R Invoice 07/23/2025 07.23.2025 - CDD - LAPTOP STAND/PAPER 99.84 0.00

01.18.62000 OFFICE SUPPLIES 33.27 07.23.2025 - CDD - LAPTOP STA

01.19.62200 DEPARTMENTAL SUPPLIE 07.23.2025 - CDD - LAPTOP STA 33.28

01.41.62000 OFFICE SUPPLIES 07.23.2025 - CDD - LAPTOP STA 33.29 1R9R-M7RV-936 Invoice 08/04/2025 08.04.2025 - REC - ROBSON SUPPLIES 393.86 0.00

21.63.61187 ROBSON AFTER SCHOOL 393.86 08.04.2025 - REC - ROBSON SUP 1TKX-WD16-6Q3 Invoice 07/29/2025 07.29.2025 - REC - CAMPKIDMARIN MINI 17.31 0.00

21.63.62985 CAMP KIDMARIN MINI S 17.31 07.29.2025 - REC - CAMPKIDMA 1TKX-WD16-KDG Invoice 07/30/2025 07.30.2025 - REC - WIRELESS MOUSE 10.79 0.00

21.65.62000 OFFICE SUPPLIES 10.79 07.30.2025 - REC - WIRELESS M 1VG1-4Y7C-D6M Invoice 07/29/2025 07.29.2025 - REC - CAMPKIDMARIN MIGH 76.10 0.00

21.63.62985 CAMP KIDMARIN MINI S 76.10 07.29.2025 - REC - CAMPKIDMA 1X4G-4P1G-KKF6 Invoice 07/30/2025 07.30.2025 - REC - ROBSON SUPPLIES 287.19 0.00

21.63.61187 ROBSON AFTER SCHOOL 287.19 07.30.2025 - REC - ROBSON HO **Void** 08/07/2025 100262 Regular 0.00 0.00
00001 AT&T Calnet 08/07/2025 100263 Regular 0.00 63.16
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 576-07272025 Invoice 07/27/2025 576 - TH CHAMBERS PHONE - 06.27.25-07 63.16 0.00

41.41.61701 UTILITIES 63.16 576 - TH CHAMBERS PHONE - 0 00388 Baker & Taylor 08/07/2025 100264 Regular 0.00 956.58 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2039177316 Invoice 07/11/2025 07.11.2025 - CHILDREN'S BOOKS 18.43 0.00

01.71.62302 CHILDRENS BOOKS 18.43 07.11.2025 - CHILDREN'S BOOK 2039177317 Invoice 07/11/2025 07.11.2025 - CHILDREN'S BOOKS 52.45 0.00

01.71.62302 CHILDRENS BOOKS 52.45 07.11.2025 - CHILDREN'S BOOK 2039177411 Invoice 07/11/2025 07.11.2025 - ADULT BOOKS 21.88 0.00

27.71.62301 ADULT BOOKS 21.88 07.11.2025 - ADULT BOOKS
2039177412 Invoice 07/11/2025 07.11.2025 - ADULT BOOKS 27.96 0.00

27.71.62301 ADULT BOOKS 27.96 07.11.2025 - ADULT BOOKS
2039177413 Invoice 07/11/2025 07.11.2025 - ADULT BOOKS 23.87 0.00

27.71.62301 ADULT BOOKS 23.87 07.11.2025 - ADULT BOOKS
2039177414 Invoice 07/11/2025 07.11.2025 - ADULT BOOKS 45.11 0.00

27.71.62301 ADULT BOOKS 45.11 07.11.2025 - ADULT BOOKS
2039188377 Invoice 07/18/2025 07.18.2025 - ADULT BOOKS 47.74 0.00

27.71.62301 ADULT BOOKS 47.74 07.18.2025 - ADULT BOOKS
2039188378 Invoice 07/18/2025 07.18.2025 - ADULT BOOKS 32.44 0.00

27.71.62301 ADULT BOOKS 32.44 07.18.2025 - ADULT BOOKS
2039188379 Invoice 07/18/2025 07.18.2025 - ADULT BOOKS 17.86 0.00

27.71.62301 ADULT BOOKS 17.86 07.18.2025 - ADULT BOOKS
2039188380 Invoice 07/18/2025 07.18.2025 - ADULT BOOKS 25.84 0.00

27.71.62301 ADULT BOOKS 25.84 07.18.2025 - ADULT BOOKS
2039193666 Invoice 07/22/2025 07.22.2025 - ADULT BOOKS 22.55 0.00

27.71.62301 ADULT BOOKS 22.55 07.22.2025 - ADULT BOOKS
2039193667 Invoice 07/22/2025 07.22.2025 - ADULT BOOKS 372.30 0.00

27.71.62301 ADULT BOOKS 372.30 07.22.2025 - ADULT BOOKS 2039193668 Invoice 07/22/2025 07.22.2025 - ADULT BOOKS 66.37 0.00

27.71.62301 ADULT BOOKS 66.37 07.22.2025 - ADULT BOOKS
2039193669 Invoice 07/22/2025 07.22.2025 - ADULT BOOKS 30.29 0.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
57 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 3 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number

27.71.62301 ADULT BOOKS 30.29 07.22.2025 - ADULT BOOKS
2039193670 Invoice 07/22/2025 07.22.2025 - ADULT BOOKS 14.25 0.00

27.71.62301 ADULT BOOKS 14.25 07.22.2025 - ADULT BOOKS
2039193671 Invoice 07/22/2025 07.22.2025 - ADULT BOOKS 21.24 0.00

27.71.62301 ADULT BOOKS 21.24 07.22.2025 - ADULT BOOKS
5019585031 Invoice 07/01/2025 07.01.2025 - CHILDREN'S BOOKS 28.79 0.00

01.71.62302 CHILDRENS BOOKS 28.79 07.01.2025 - CHILDREN'S BOOK H72846680 Invoice 07/01/2025 07.01.2025 - VIDEOS 24.89 0.00

01.71.62307 VIDEOS 24.89 07.01.2025 - VIDEOS
H72846720 Invoice 07/01/2025 07.01.2025 - VIDEOS 17.50 0.00

01.71.62307 VIDEOS 17.50 07.01.2025 - VIDEOS
H72896830 Invoice 07/10/2025 07.10.2025 - VIDEOS 44.82 0.00

01.71.62307 VIDEOS 44.82 07.10.2025 - VIDEOS
**Void** 08/07/2025 100265 Regular 0.00 0.00
00007 Bay Cities Joint Power Insurance Authority 08/07/2025 100266 Regular 0.00 6,678.63 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount BCJPIA-0322-202 Invoice 06/30/2025 07.25.2025 - LIABILITY/WORKERS COMP - 6,678.63 0.00

40.21.61906 LIABILITY INSURANCE CLA 4,397.00 07.25.2025 - LIABILITY/WORKER

40.21.61907 WORKERS COMPENSATIO 07.25.2025 - LIABILITY/WORKER 2,281.63 00061 Bill Jacobson 08/07/2025 100267 Regular 0.00 337.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 1657 Invoice 07/30/2025 07.30.2025 - SANHUB AUDIO ARCHIVE - J 337.50 0.00

01.12.61150 OUTSIDE SERVICES-OTHE 337.50 07.30.2025 - SANHUB AUDIO AR 03946 BlueTriton Brands Inc 08/07/2025 100268 Regular 0.00 187.95 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 05G8720212838 Invoice 07/24/2025 07.24.2025 - WATER DELIVERY - JUL 2025 187.95 0.00

21.65.62200 DEPARTMENTAL SUPPLIE 187.95 07.24.2025 - WATER DELIVERY - 00032 Brady Industries, NorCal 08/07/2025 100269 Regular 0.00 549.44 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 10378626 Invoice 07/21/2025 07.21.2025 - CORPYARD - JANITORIAL SUP 549.44 0.00

41.41.61501 BLDG. MAINT-JANITORIAL 549.44 07.21.2025 - CORPYARD - JANIT 00193 CalMat Company 08/07/2025 100270 Regular 0.00 694.55 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2507-017847 Invoice 07/30/2025 07.30.2025 - BUS HUB - DRAINAGE/CRUS 694.55 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 694.55 07.30.2025 - BUS HUB - DRAINA 03135 CentralSquare Technologies 08/07/2025 100271 Regular 0.00 6,268.12 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 443687 Invoice 08/01/2025 08.01.2025 - HORIZON CLOUD TRAKIT AN 6,268.12 0.00

42.21.61150 OUTSIDE SERVICES-OTHE 6,268.12 08.01.2025 - HORIZON CLOUD T 02315 Coastland Civil Engineering Inc. 08/07/2025 100272 Regular 0.00 1,485.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 62322 Invoice 06/30/2025 06.30.2025 - BLDG DEPT SERVICES - JUN 2 1,485.00 0.00

01.41.61150 OUTSIDE SERVICES-OTHE 1,485.00 06.30.2025 - BLDG DEPT SERVIC 02524 Code Source 08/07/2025 100273 Regular 0.00 5,676.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
58 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 4 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 11940 Invoice 06/18/2025 06.18.2025 - INITIAL REVIEW - 39 BENNIT 1,627.00 0.00

01.41.61157 PLAN CHECKING 1,627.00 06.18.2025 - INITIAL REVIEW - 3 11945 Invoice 07/03/2025 07.03.2025 - INITIAL REVIEW - 10 CREST R 1,303.00 0.00

01.19.61150 OUTSIDE SERVICES-OTHE 1,303.00 07.03.2025 - INITIAL REVIEW - 1 11951 Invoice 07/17/2025 07.17.2025 - COMPLETE PLAN REVIEW 15 1,767.00 0.00

01.19.61150 OUTSIDE SERVICES-OTHE 1,767.00 07.17.2025 - COMPLETE PLAN R 11956 Invoice 07/27/2025 07.27.2025 - RECHECK REVIEW - 20 WOO 979.00 0.00

01.19.61150 OUTSIDE SERVICES-OTHE 979.00 07.27.2025 - RECHECK REVIEW - 00072 Comcast 08/07/2025 100274 Regular 0.00 183.73
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 049-07222025 Invoice 07/22/2025 049 - TH UTILITIES - 07.27.25-08.26.25 183.73 0.00

41.41.61701 UTILITIES 183.73 049 - TH UTILITIES - 07.27.25-08 03853 Dana V. Beck 08/07/2025 100275 Regular 0.00 7,500.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount RVFH INVOICE 14 Invoice 07/18/2025 07.18.2025 - RVFH20 ONSITE PROJECT M 7,500.00 0.00

15.32.63100 CONSTRUCTION 7,500.00 07.18.2025 - RVFH20 ONSITE PR 03567 DARCY BELL 08/07/2025 100276 Regular 0.00 1,090.72 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014991 Invoice 06/30/2025 07.30.2025 - SNACK SHACK RECEIPTS - EN 1,090.72 0.00

01.82.62206 Snack Shack 1,090.72 07.30.2025 - SNACK SHACK REC 00533 Davis Sign Company 08/07/2025 100277 Regular 0.00 560.45 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 40197 Invoice 07/28/2025 07.28.2025 - AFRAME INSERTS - TRAFFIC 327.75 0.00

14.41.63123 CAPITAL OUTLAY - SIGNAL 327.75 07.28.2025 - AFRAME INSERTS - 40229 Invoice 08/04/2025 08.04.2025 - MEMORIAL SIGNS UPDATE 180.26 0.00

15.81.63100 CONSTRUCTION 180.26 08.04.2025 - MEMORIAL SIGNS 40230 Invoice 08/01/2025 08.01.2025 - LOTA QR CODE PATCHES VAL 52.44 0.00

60.14.62903 LIVE ON THE AVENUE 52.44 08.01.2025 - LOTA QR CODE PAT 01320 DC Electric Group Inc 08/07/2025 100278 Regular 0.00 9,921.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 477404 Invoice 07/23/2025 07.23.2025 - CORPYARD EV CHARGING 9,921.00 0.00

15.41.63100 CONSTRUCTION 9,921.00 07.23.2025 - CORPYARD EV CHA 00266 Edwin P Gurka, Jr 08/07/2025 100279 Regular 0.00 838.75 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 14-2025 Invoice 07/23/2025 07.23.2025 - ARBORIST SERVICES - JUL 20 838.75 0.00

01.81.61105 OUTSIDE SERVICES-TREES 838.75 07.23.2025 - ARBORIST SERVICE 00087 Elite Tree Service 08/07/2025 100280 Regular 0.00 21,395.09 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2025-7-10 Invoice 07/18/2025 07.18.2025 - FIRE CLEARANCE ROBSON/S 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 07.18.2025 - FIRE CLEARANCE R 2025-7-11 Invoice 07/18/2025 07.18.2025 - FIRE CLEARANCE MEMORIAL 2,880.00 0.00

01.81.61104 OUTSIDE SERVICES-GROU 2,880.00 07.18.2025 - FIRE CLEARANCE ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
59 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 5 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number 2025-7-12 Invoice 07/18/2025 07.18.2025 - FIRE CLEARANCE DOG PARK 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 07.18.2025 - FIRE CLEARANCE D 2025-7-13 Invoice 07/18/2025 07.18.2025 - FIRE CLEARANCE SA/SR GULL 2,962.97 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,962.97 07.18.2025 - FIRE CLEARANCE S 2025-7-14 Invoice 07/25/2025 07.25.2025 - EMERGENCY TREE REMOVAL 2,880.00 0.00

01.81.61105 OUTSIDE SERVICES-TREES 2,880.00 07.25.2025 - EMERGENCY TREE 2025-7-15 Invoice 07/25/2025 07.25.2025 - CENTER/CREEK RDS - TREE R 3,600.00 0.00

01.42.61144 Medians 1,300.00 07.25.2025 - CENTER/CREEK RD

01.81.61105 OUTSIDE SERVICES-TREES 07.25.2025 - CENTER/CREEK RD 2,300.00 2025-7-16 Invoice 07/28/2025 07.28.2025 - WINDSHIELD REPLACEMENT 432.12 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 432.12 07.28.2025 - WINDSHIELD REPL 2025-7-9 Invoice 07/18/2025 07.18.2025 - FIRE CLEARANCE IDLEWOOD 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 07.18.2025 - FIRE CLEARANCE I 02777 Elizabeth Flanagan 08/07/2025 100281 Regular 0.00 91.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 08042025-4 Invoice 08/04/2025 08.04.2025 - PAINTING WORKSHOPS - JUL 91.00 0.00

21.62.61171 ADULT CULTURE SERVICE 91.00 08.04.2025 - PAINTING WORKS 03396 Emily B. Stucky 08/07/2025 100282 Regular 0.00 875.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 0625 Invoice 06/30/2025 07.29.2025 - SING AND STOMP - JUN 202 500.00 0.00

01.71.61132 OUTSIDE SVCS-PROGRAM 500.00 07.29.2025 - SING AND STOMP - 0725 Invoice 07/29/2025 07.29.2025 - SING AND STOMP - JUL 2025 375.00 0.00

01.71.61132 OUTSIDE SVCS-PROGRAM 375.00 07.29.2025 - SING AND STOMP - 00092 Ewing Irrigation Products 08/07/2025 100283 Regular 0.00 109.74 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 26849560 Invoice 07/14/2025 07.14.2025 - MEMORIAL PARK - IRRIGATI 109.74 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 109.74 07.14.2025 - MEMORIAL PARK - 00017 Fairfax Building Supply Co. Inc. 08/07/2025 100284 Regular 0.00 326.62 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 299866 Invoice 07/16/2025 07.16.2025 - WASP/HORNET KILLER & HA 9.93 0.00

41.41.61150 OUTSIDE SERVICES-OTHE 9.93 07.16.2025 - WASP/HORNET KIL 299917 Invoice 07/17/2025 07.17.2025 - ICC - CONNECTORS/HARDW 75.87 0.00

31.41.61506 BLDG. MAINT-OTHER 75.87 07.17.2025 - ICC - CONNECTORS 299939 Invoice 07/18/2025 07.18.2025 - FERTILIZER 41.81 0.00

95.41.61150 OUTSIDE SERVICES-OTHE 41.81 07.18.2025 - FERTILIZER 300082 Invoice 07/21/2025 07.21.2025 - MEDIUM SAN/MALLET/LEVE 67.62 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 67.62 07.21.2025 - MEDIUM SAN/MA 300189 Invoice 07/23/2025 07.23.2025 - MEDIUM SAND 32.34 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 32.34 07.23.2025 - MEDIUM SAND 300310 Invoice 07/25/2025 07.25.2025 - FERTILIZER 20.91 0.00

95.41.61150 OUTSIDE SERVICES-OTHE 20.91 07.25.2025 - FERTILIZER 300384 Invoice 07/28/2025 07.28.2025 - CREEK PARK - FENCE SUPPLI 78.14 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 78.14 07.28.2025 - CREEK PARK - FENC 04034 George Masker 08/07/2025 100285 Regular 0.00 77,377.50 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
60 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 6 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 43781A Invoice 07/18/2025 07.18.2025 - ROBSON EXTERIOR PAINTIN 19,344.37 0.00

15.41.63117 CONSTRUCTION - BUILDI 19,344.37 07.18.2025 - ROBSON EXTERIOR 43781B Invoice 06/30/2025 07.18.2025 - ROBSON EXTERIOR PAINTIN 58,033.13 0.00

15.41.63117 CONSTRUCTION - BUILDI 58,033.13 07.18.2025 - ROBSON EXTERIOR 03776 GFDS Engineers, Inc. 08/07/2025 100286 Regular 0.00 4,165.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 25037.00-2 Invoice 06/30/2025 07.15.2025 - SA LIBRARY - JUN 2025 4,165.00 0.00

41.41.63117 CONSTRUCTION - BUILDI 4,165.00 07.15.2025 - SA LIBRARY - JUN 2 03712 Gridscape Solutions, Inc. 08/07/2025 100287 Regular 0.00 30,318.87 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount SAL/10/2025 Invoice 06/04/2025 06.04.2025 - RESILIENT HUB - MILESTONE 14,952.06 0.00

15.90.63100 CONSTRUCTION 14,952.06 06.04.2025 - RESILIENT HUB - M SAL/11/2025 Invoice 07/30/2025 Resilient Hub: COR #4 Charger & Cor #5 Fl 15,366.81 0.00

15.90.63100 CONSTRUCTION 15,366.81 Resilient Hub: COR #4 Charger & 02399 HdL Coren & Cone 08/07/2025 100288 Regular 0.00 2,302.58 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount SIN052769 Invoice 07/28/2025 07.28.2025 - CONTRACT SVCS PROP TAX - 2,302.58 0.00

01.12.61150 OUTSIDE SERVICES-OTHE 2,302.58 07.28.2025 - CONTRACT SVCS P 02586 HdL Software LLC 08/07/2025 100289 Regular 0.00 1,997.86 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount SIN052364 Invoice 06/30/2025 06.30.2025 - NEW ACCOUNTS PROCESSED 1,997.86 0.00

01.12.61150 OUTSIDE SERVICES-OTHE 1,997.86 06.30.2025 - NEW ACCOUNTS P 03332 Heidi Scoble 08/07/2025 100290 Regular 0.00 41.78 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014985 Invoice 07/28/2025 07.28.2025 - REIMB - CELEBRATORY SUPP 41.78 0.00

01.18.62000 OFFICE SUPPLIES 41.78 07.28.2025 - REIMB - CELEBRAT 02236 HooplaDigital 08/07/2025 100291 Regular 0.00 968.39 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 507536011 Invoice 07/31/2025 07.31.2025 - DIGITAL ACCOUNT - LIBRARY 968.39 0.00

27.71.62309 E BOOKS 968.39 07.31.2025 - DIGITAL ACCOUNT 03913 Independent Distribution Collective LLC 08/07/2025 100292 Regular 0.00 2,899.20 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014992 Invoice 08/04/2025 08.04.2025 - SHOW/CONCERT MGMT - A 2,350.00 0.00

60.14.62903 LIVE ON THE AVENUE 2,350.00 08.04.2025 - SHOW/CONCERT REIM-LOTA-2025- Invoice 08/05/2025 08.05.2025 - REIMB - LOTA EQUIPMENT 549.20 0.00

21.64.61185 SPECIAL EVENT EXPENSE 549.20 08.05.2025 - REIMB - LOTA EQUI 03837 Ivy Tzur 08/07/2025 100293 Regular 0.00 13,380.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
61 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 7 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 11 Invoice 08/04/2025 08.04.2025 - PROJECT MGMT - 06.30.25-0 13,380.00 0.00

01.41.61150 OUTSIDE SERVICES-OTHE 2,676.00 08.04.2025 - PROJECT MGMT -

14.41.63127 SAFE ROUTES 08.04.2025 - PROJECT MGMT - 4,014.00

15.32.63100 CONSTRUCTION 08.04.2025 - PROJECT MGMT - 4,014.00

41.41.63117 CONSTRUCTION - BUILDI 08.04.2025 - PROJECT MGMT - 2,676.00 00022 Jackson's Hardware Inc. 08/07/2025 100294 Regular 0.00 387.96 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 182918 Invoice 07/24/2025 07.24.2025 - GENERAL SUPPLIES/HARDW 387.96 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 387.96 07.24.2025 - GENERAL SUPPLIES 03581 Jocelyn K Lee 08/07/2025 100295 Regular 0.00 150.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 9 Invoice 07/22/2025 07.22.2025 - MONDAY STORYTIME SUB 0 150.00 0.00

01.71.61132 OUTSIDE SVCS-PROGRAM 150.00 07.22.2025 - MONDAY STORYTI 03934 John D'Andrea 08/07/2025 100296 Regular 0.00 30.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014987 Invoice 07/31/2025 07.31.2025 - REFUND - BUSINESS LICENSE 30.00 0.00

01.00.42001 BUSINESS LICENSE TAX 30.00 07.31.2025 - REFUND - BUSINES 02558 Kanopy 08/07/2025 100297 Regular 0.00 844.00
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 463081 Invoice 07/31/2025 07.31.2025 - VIDEOS - LIBRARY - JUL 2025 844.00 0.00

27.71.62307 VIDEOS 844.00 07.31.2025 - VIDEOS - LIBRARY - 04032 Karen Mendelow 08/07/2025 100298 Regular 0.00 66.44 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014997 Invoice 07/29/2025 07.29.2025 - REIMB - CAC GARDEN PROJE 66.44 0.00

90.41.61150 OUTSIDE SERVICES-OTHE 66.44 07.29.2025 - REIMB - CAC GARD 01707 Kevin Keith 08/07/2025 100299 Regular 0.00 675.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014995 Invoice 08/04/2025 08.04.2025 - CAMP BACKWARDS FIELD TR 675.00 0.00

21.63.61184 CAMP KIDMARIN MIGHT 337.50 08.04.2025 - CAMP BACKWARD

21.63.61207 CAMP KIDMARIN MINI SE 08.04.2025 - CAMP BACKWARD 337.50 03549 Kid's Choice Camps LLC 08/07/2025 100300 Regular 0.00 3,248.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 07282025-2 Invoice 07/28/2025 07.28.2025 - DUNGEONS & DRAGONS CA 826.00 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 826.00 07.28.2025 - DUNGEONS & DRA 08042025-5 Invoice 08/04/2025 08.04.2025 - CARPENTRY FOR KIDS - WEE 60.00 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 60.00 08.04.2025 - CARPENTRY FOR KI INV0014993 Invoice 08/04/2025 08.04.2025 - CARPENTRY FOR KIDS - WEE 2,362.50 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 2,362.50 08.04.2025 - CARPENTRY FOR KI 04006 Kyocera Document Solutions Northern Californ 08/07/2025 Regular 0.00 139.37 100301 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
62 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 8 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 55E1838991 Invoice 07/29/2025 07.29.2025 - CONTRACT BASE RATE 06.13 139.37 0.00

42.21.63003 COMPUTER HARDWARE/ 139.37 07.29.2025 - CONTRACT BASE R 03417 Lindsey Klein 08/07/2025 100302 Regular 0.00 86.21 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014984 Invoice 07/24/2025 07.24.2025 - REIMB - INTERN SENDOFF L 86.21 0.00

01.18.61150 OUTSIDE SERVICES-OTHE 86.21 07.24.2025 - REIMB - INTERN SE 00377 Luis Quezada 08/07/2025 100303 Regular 0.00 6,671.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014990 Invoice 07/24/2025 07.24.2025 - USA SOCCER CAMP 07/14 3,538.50 0.00

21.63.61183 CAMP SPORTS SERVICES 3,538.50 07.24.2025 - USA SOCCER CAM INV0014994 Invoice 08/05/2025 08.05.2025 - USA SOCCER CAMP 07/28 3,132.50 0.00

21.63.61183 CAMP SPORTS SERVICES 3,132.50 08.05.2025 - USA SOCCER CAM 00029 Marin IT 08/07/2025 100304 Regular 0.00 41,928.09 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2025-127824 Invoice 06/13/2025 06.13.2025 - AGREEMENT IT MGMT SUPP 5,026.37 0.00

01.21.61150 OUTSIDE SERVICES-OTHE 5,026.37 06.13.2025 - AGREEMENT IT M 2025-127990 Invoice 06/30/2025 07.11.2025 - ONSITE SUPPORT/SSL RENE 5,819.99 0.00

01.21.61150 OUTSIDE SERVICES-OTHE 5,819.99 07.11.2025 - ONSITE SUPPORT/ 2025-128144 Invoice 06/30/2025 07.16.2025 - AGMNT MANAGED OFFICE3 2,005.50 0.00

01.21.61150 OUTSIDE SERVICES-OTHE 2,005.50 07.16.2025 - AGMNT MANAGED 2025-128261 Invoice 06/30/2025 07.25.2025 - AGREEMENT IT MGMT SUPP 5,026.67 0.00

01.12.61150 OUTSIDE SERVICES-OTHE 5,026.67 07.25.2025 - AGREEMENT IT M 2025-128323 Invoice 06/30/2025 06.30.2025 - WORK STN REPLACEMENTS 24,049.56 0.00

01.00.48064 BUILDING TECHNICAL FEE 4,703.24 06.30.2025 - WORK STN REPLAC

01.21.61150 OUTSIDE SERVICES-OTHE 06.30.2025 - WORK STN REPLAC 15,236.28

01.41.61150 OUTSIDE SERVICES-OTHE 06.30.2025 - WORK STN REPLAC 2,055.02

01.71.61150 OUTSIDE SERVICES-OTHE 06.30.2025 - WORK STN REPLAC 2,055.02 01036 Matrix HG Inc 08/07/2025 100305 Regular 0.00 270.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 188150 Invoice 07/28/2025 07.28.2025 - BOILER PUMP LEAK 270.00 0.00

41.41.61150 OUTSIDE SERVICES-OTHE 270.00 07.28.2025 - BOILER PUMP LEA 00372 Miller Pacific 08/07/2025 100306 Regular 0.00 1,758.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 38577 Invoice 06/30/2025 07.23.2025 - FH20 PHASE 2&3 - OCT 2024 1,758.50 0.00

15.32.63100 CONSTRUCTION 1,758.50 07.23.2025 - FH20 PHASE 2&3 - 01916 NATIONAL ACADEMY OF ATHLETICS 08/07/2025 100307 Regular 0.00 2,431.80 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014989 Invoice 07/24/2025 07.24.2025 - FLAG FOOTBALL 07/21 2,431.80 0.00

21.63.61183 CAMP SPORTS SERVICES 2,431.80 07.24.2025 - FLAG FOOTBALL 07 01388 NCSI 08/07/2025 100308 Regular 0.00 185.00
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 58271 Invoice 06/01/2025 06.01.2025 - REC DEPT BACKGROUND CH 148.00 0.00

21.65.61137 FINGERPRINTING 148.00 06.01.2025 - REC DEPT BACKGR ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
63 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 9 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number 60333 Invoice 08/01/2025 08.01.2025 - BACKGROUND CHECKS - REC 37.00 0.00

21.65.61137 FINGERPRINTING 37.00 08.01.2025 - BACKGROUND CHE 01346 Nerviani Paving Inc 08/07/2025 100309 Regular 0.00 13,500.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 7701 Invoice 07/10/2025 07.10.2025 - ASPHALT REPLCMNT - 43/45 13,500.00 0.00

15.41.63109 UNPROGRAMMED DRAIN 13,500.00 07.10.2025 - ASPHALT REPLCMN 00165 Pacific Telemanagement Services - PTS 08/07/2025 100310 Regular 0.00 93.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2144778 Invoice 07/24/2025 07.24.2025 - TH PAYPHONE - AUG 2025 93.00 0.00

01.42.61705 UTILITIES-TELEPHONE 93.00 07.24.2025 - TH PAYPHONE - AU 03397 Patrick O' Neill 08/07/2025 100311 Regular 0.00 34,603.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 184 Invoice 06/16/2025 06.16.2025 - FH20 CONSTRUCTION - JAN- 34,603.00 0.00

15.32.63100 CONSTRUCTION 34,603.00 06.16.2025 - FH20 CONSTRUCTI 04031 Positive Coaching Alliance 08/07/2025 100312 Regular 0.00 500.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV-85799 Invoice 07/30/2025 07.30.2025 - TRAINING FOR YOUTH SOCC 500.00 0.00

21.61.61164 SOCCER SERVICES 500.00 07.30.2025 - TRAINING FOR YO 02839 Quadient Finance USA, Inc 08/07/2025 100313 Regular 0.00 1,000.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 274-07212025 Invoice 06/30/2025 07.21.2025 - TH POSTAGE - JUN 2025 1,000.00 0.00

01.12.62003 POSTAGE 200.00 07.21.2025 - TH POSTAGE - JUN

01.18.62003 POSTAGE 07.21.2025 - TH POSTAGE - JUN 200.00

01.41.62003 POSTAGE 07.21.2025 - TH POSTAGE - JUN 200.00

01.71.62003 POSTAGE 07.21.2025 - TH POSTAGE - JUN 200.00

01.82.62003 POSTAGE 07.21.2025 - TH POSTAGE - JUN 200.00 03579 Recreation Reimagined Inc 08/07/2025 100314 Regular 0.00 4,854.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 07282025-1 Invoice 07/28/2025 07.28.2025 - CAMP WILDFLOWER - WEEK 2,044.00 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 2,044.00 07.28.2025 - CAMP WILDFLOWE 08042025-3 Invoice 08/04/2025 08.04.2025 - BABYSITTER TRAINING - WEE 2,810.50 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 2,810.50 08.04.2025 - BABYSITTER TRAIN 03696 Sequoia Ecological Consulting, Inc. 08/07/2025 100315 Regular 0.00 8,204.85 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 000002025251 Invoice 06/02/2025 06.02.2025 - SORICH BOTANICAL SURVEYS 8,204.85 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 8,204.85 06.02.2025 - SORICH BOTANICA 03590 The Marin Dojo, Inc. 08/07/2025 100316 Regular 0.00 144.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 07282025-3 Invoice 07/28/2025 07.28.2025 - TAI CHI - JUL 2025 144.00 0.00

21.62.61171 ADULT CULTURE SERVICE 144.00 07.28.2025 - TAI CHI - JUL 2025 00211 Tim Musselman 08/07/2025 100317 Regular 0.00 200.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
64 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 10 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0014996 Invoice 04/16/2025 04.16.2025 - BREAKFAST WITH SANTA 202 200.00 0.00

60.14.62926 BREAKFAST WITH SANTA 200.00 04.16.2025 - BREAKFAST WITH S 03207 Toni DeFrancis 08/07/2025 100318 Regular 0.00 340.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2025-PC721 Invoice 07/29/2025 07.29.2025 - TRANSCRIPTION PC 07/21 180.00 0.00

01.12.60010 TEMPORARY HELP 180.00 07.29.2025 - TRANSCRIPTION P 2025-TC722 Invoice 08/02/2025 08.02.2025 - TRANSCRIPTION TC 07/22 160.00 0.00

01.12.61150 OUTSIDE SERVICES-OTHE 160.00 08.02.2025 - TRANSCRIPTION T 00696 Town of Fairfax 08/07/2025 100319 Regular 0.00 16,637.49 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 4-2025-0630 Invoice 06/30/2025 07.25.2025 - REIMB - CLIMATE ACTION CR 16,637.49 0.00

90.41.61100 OUTSIDE SERVICES 16,637.49 07.25.2025 - REIMB - CLIMATE A 00215 Transbay Lock 08/07/2025 100320 Regular 0.00 191.19 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 94198 Invoice 07/24/2025 07.24.2025 - TENNIS COURT KEYS 191.19 0.00

01.81.61150 OUTSIDE SERVICES-OTHE 191.19 07.24.2025 - TENNIS COURT KEY 00220 Underground Service Alert of Northern Californ 08/07/2025 Regular 0.00 2,965.80 100321 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount 2025176567 Invoice 07/21/2025 07.21.2025 - MEMBERSHIP DUES 2025 2,965.80 0.00

01.42.61101 OUTSIDE SERVICES-PROF 2,965.80 07.21.2025 - MEMBERSHIP DUE 00033 Water Components & Building Supply 08/07/2025 100322 Regular 0.00 291.56 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 30669154 Invoice 07/24/2025 07.24.2025 - CORPYARD - MANHOLE HOO 291.56 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 291.56 07.24.2025 - CORPYARD - MAN 03454 Willdan Engineering 08/07/2025 100323 Regular 0.00 4,218.75 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 002-35377 Invoice 06/30/2025 07.18.2025 - BLDG/SAFETY PLAN CHECKS 4,218.75 0.00

01.41.61157 PLAN CHECKING 4,218.75 07.18.2025 - BLDG/SAFETY PLA 02818 Yara Fraser 08/07/2025 100324 Regular 0.00 130.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 13 Invoice 07/22/2025 07.22.2025 - SATURDAY STORYTIME SUB 0 130.00 0.00

01.71.61132 OUTSIDE SVCS-PROGRAM 130.00 07.22.2025 - SATURDAY STORYTI 03932 Acevedo and Longfellow LLP 08/21/2025 100325 Regular 0.00 8,492.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 35 Invoice 08/03/2025 08.03.2025 - GENERAL LEGAL SERVICES - J 8,189.50 0.00

01.16.61138 GENERAL COUNSEL LEGA 8,189.50 08.03.2025 - GENERAL LEGAL SE 36 Invoice 08/03/2025 08.03.2025 - PLANNING LEGAL SERVICES - 302.50 0.00

01.16.61138 GENERAL COUNSEL LEGA 302.50 08.03.2025 - PLANNING LEGAL S 02920 Amazon Business 08/21/2025 100326 Regular 0.00 2,170.38 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
65 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 11 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 1646-V3T9-4N6Y Invoice 08/06/2025 08.06.2025 - REC - CAMP KIDMARIN MIG 22.53 0.00

21.63.62984 CAMP KIDMARIN MIGHT 22.53 08.06.2025 - REC - CAMP KIDM 16GX-1X7P-3CDG Invoice 08/07/2025 08.07.2025 - REC - CAMP KIDMARIN MINI 32.46 0.00

21.63.62985 CAMP KIDMARIN MINI S 32.46 08.07.2025 - REC - CAMP KIDM 17PG-7DL6-FG41 Invoice 07/21/2025 07.21.2025 - REC - CLASSROOM RUG 125.63 0.00

21.63.62979 PARKSIDE SUPPLIES 125.63 07.21.2025 - REC - CLASSROOM 1G6L-K7WD-1M6 Invoice 08/11/2025 08.11.2025 - REC - OFFICE SUPPLIES 16.34 0.00

21.65.62000 OFFICE SUPPLIES 16.34 08.11.2025 - REC - OFFICE SUPP 1HX9-TRD1-99LT Invoice 08/06/2025 08.06.2025 - REC - CAMP KIDMARIN MIG 80.50 0.00

21.63.62984 CAMP KIDMARIN MIGHT 80.50 08.06.2025 - REC - CAMP KIDM 1MLN-XHG1-WG Invoice 08/05/2025 08.05.2025 - REC - CAMP KIDMARIN MIG 495.89 0.00

21.63.62984 CAMP KIDMARIN MIGHT 495.89 08.05.2025 - REC - CAMP KIDM 1NL3-HRPM-FCT6 Invoice 08/08/2025 08.08.2025 - ST&PK - PLASTIC SHEETING 753.18 0.00

31.41.61506 BLDG. MAINT-OTHER 753.18 08.08.2025 - ST&PK - PLASTIC S 1NQV-LGVY-7WL Invoice 07/18/2025 07.18.2025 - ST&PK - CONCRETE ANCHOR 64.94 0.00

01.42.62909 SUPPLIES-TRAFFIC CONTR 64.94 07.18.2025 - ST&PK - CONCRETE 1RQV-GGTK-DW3 Invoice 08/06/2025 08.06.2025 - REC - CAMP KIDMARIN MINI 153.91 0.00

21.63.62985 CAMP KIDMARIN MINI S 153.91 08.06.2025 - REC - CAMP KIDM 1TC1-LYCM-43RT Invoice 08/07/2025 08.07.2025 - ST&PK - GARDEN HOSE REEL 218.49 0.00

31.41.61506 BLDG. MAINT-OTHER 218.49 08.07.2025 - ST&PK - GARDEN H 1TKY-TQQF-7D93 Invoice 08/06/2025 08.06.2025 - REC - OFFICE SUPPLIES 12.86 0.00

21.65.62000 OFFICE SUPPLIES 12.86 08.06.2025 - REC - OFFICE SUPP 1TY1-XP6V-69CP Invoice 08/11/2025 08.11.2025 - REC - CAMP KIDMARIN MINI 193.65 0.00

21.63.62985 CAMP KIDMARIN MINI S 193.65 08.11.2025 - REC - CAMP KIDM 03299 Answer MTI 08/21/2025 100327 Regular 0.00 176.60
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 000037-217-931 Invoice 08/01/2025 08.01.2025 - CALL CENTER SERVICE - JUL 176.60 0.00

01.41.61150 OUTSIDE SERVICES-OTHE 176.60 08.01.2025 - CALL CENTER SERV 02806 AQUASCAPE POOL SERVICE 08/21/2025 100328 Regular 0.00 209.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 34805 Invoice 07/31/2025 07.31.2025 - MONTHLY POOL SERVICE - J 209.00 0.00

14.81.61150 OUTSIDE SERVICES-OTHE 209.00 07.31.2025 - MONTHLY POOL SE 03903 Argo Construction, Inc. 08/21/2025 100329 Regular 0.00 327,384.62 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount G702-FH20-6 Invoice 08/01/2025 08.01.2025 - FH20 CONSTRUCTION - PAY 327,384.62 0.00

15.32.63100 CONSTRUCTION 327,384.62 08.01.2025 - FH20 CONSTRUCTI 01385 Asian Art Museum Foundation of San Francisco 08/21/2025 Regular 0.00 200.00 100330 Account Number Account Name Item Description Distribution Amount Payable # Payable Type Post Date Payable Description Discount Amount Payable Amount INV0015164 Invoice 08/14/2025 08.14.2025 - PRESENTATIONS - AUG/SEP 2 200.00 0.00

01.71.61132 OUTSIDE SVCS-PROGRAM 200.00 08.14.2025 - PRESENTATIONS - 00408 Astro Jump of Northbay 08/21/2025 100331 Regular 0.00 429.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
66 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 12 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 38449991 Invoice 08/20/2025 01.29.2025 - CAMP KIDMARIN BULL RIDE 429.00 0.00

21.63.61184 CAMP KIDMARIN MIGHT 214.50 01.29.2025 - CAMP KIDMARIN B

21.63.61207 CAMP KIDMARIN MINI SE 01.29.2025 - CAMP KIDMARIN B 214.50 00001 AT&T Calnet 08/21/2025 100332 Regular 0.00 365.85 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 574-08102025 Invoice 08/10/2025 574 - ALL DEPTS CENTREX - 07.10.25-08.0 273.23 0.00

41.41.61701 UTILITIES 273.23 574 - ALL DEPTS CENTREX - 07.1 579-08102025 Invoice 08/10/2025 579 - TRAFFIC SIGNAL MODEM - 07.10.25 31.28 0.00

01.41.61705 UTILITIES-TELEPHONE 31.28 579 - TRAFFIC SIGNAL MODEM - 580-08102025 Invoice 08/10/2025 580 - ROBSON HOUSE - 07.10.25-08.09.25 61.34 0.00

34.41.61705 UTILITIES-TELEPHONE 61.34 580 - ROBSON HOUSE - 07.10.2 03848 Avenues Development 08/21/2025 100333 Regular 0.00 1,787.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount TOSA-9 Invoice 08/11/2025 08.11.2025 - SR2S PROJECT MGMT - AUG 1,787.50 0.00

14.41.63127 SAFE ROUTES 1,787.50 08.11.2025 - SR2S PROJECT MG 00388 Baker & Taylor 08/21/2025 100334 Regular 0.00 274.66 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2039198669 Invoice 07/25/2025 07.25.2025 - CHILDREN'S BOOKS 15.32 0.00

01.71.62302 CHILDRENS BOOKS 15.32 07.25.2025 - CHILDREN'S BOOK 2039206800 Invoice 07/29/2025 07.29.2025 - ADULT BOOKS 18.25 0.00

27.71.62301 ADULT BOOKS 18.25 07.29.2025 - ADULT BOOKS
2039206801 Invoice 07/29/2025 07.29.2025 - ADULT BOOKS 11.78 0.00

27.71.62301 ADULT BOOKS 22.71 07.29.2025 - ADULT BOOKS

27.71.62301 ADULT BOOKS CREDIT MEMO #0003317174 (O -10.93 2039206802 Invoice 07/29/2025 07.29.2025 - ADULT BOOKS 18.22 0.00

27.71.62301 ADULT BOOKS 18.22 07.29.2025 - ADULT BOOKS
2039206803 Invoice 07/29/2025 07.29.2025 - ADULT BOOKS 23.86 0.00

27.71.62301 ADULT BOOKS 23.86 07.29.2025 - ADULT BOOKS
2039206804 Invoice 07/29/2025 07.29.2025 - ADULT BOOKS 24.20 0.00

27.71.62301 ADULT BOOKS 24.20 07.29.2025 - ADULT BOOKS
2039206805 Invoice 07/29/2025 07.29.2025 - ADULT BOOKS 23.87 0.00

27.71.62301 ADULT BOOKS 23.87 07.29.2025 - ADULT BOOKS
2039209939 Invoice 07/30/2025 07.30.2025 - CHILDREN'S BOOKS 21.58 0.00

01.71.62302 CHILDRENS BOOKS 21.58 07.30.2025 - CHILDREN'S BOOK 2039209940 Invoice 07/30/2025 07.30.2025 - CHILDREN'S BOOKS 15.98 0.00

01.71.62302 CHILDRENS BOOKS 15.98 07.30.2025 - CHILDREN'S BOOK 2039209941 Invoice 07/30/2025 07.30.2025 - CHILDREN'S BOOKS 32.72 0.00

01.71.62302 CHILDRENS BOOKS 32.72 07.30.2025 - CHILDREN'S BOOK 2039221761 Invoice 08/07/2025 08.07.2025 - CHILDREN'S BOOKS 17.65 0.00

27.71.62302 CHILDRENS BOOKS 17.65 08.07.2025 - CHILDREN'S BOOK H73035690 Invoice 07/23/2025 07.23.2025 - VIDEOS 21.61 0.00

01.71.62307 VIDEOS 21.61 07.23.2025 - VIDEOS
H73136370 Invoice 08/07/2025 08.07.2025 - VIDEOS 29.62 0.00

01.71.62307 VIDEOS 29.62 08.07.2025 - VIDEOS
03886 BELDEN Consulting Engineers 08/21/2025 100335 Regular 0.00 900.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
67 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 13 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 39883 Invoice 07/31/2025 07.31.2025 - MEMORIAL PARK EV CHARGI 900.00 0.00

15.41.63100 CONSTRUCTION 900.00 07.31.2025 - MEMORIAL PARK E 04040 Bennett Industries, Inc. 08/21/2025 100336 Regular 0.00 1,075.90 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 31817 Invoice 08/05/2025 08.05.2025 - REC - STAFF SWAG 1,075.90 0.00

21.65.62200 DEPARTMENTAL SUPPLIE 1,075.90 08.05.2025 - REC - STAFF SWAG 00193 CalMat Company 08/21/2025 100337 Regular 0.00 1,185.66 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2504-258387 Invoice 04/24/2025 04.24.2025 - MEMORIAL PARK - MINI BAR 318.31 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 318.31 04.24.2025 - MEMORIAL PARK - 2508-023018 Invoice 08/07/2025 08.07.2025 - TOPSOIL MIX - BUS STOP 156.58 0.00

01.42.62905 SUPPLIES-GROUNDS 156.58 08.07.2025 - TOPSOIL MIX - BUS 2508-023178 Invoice 08/07/2025 08.07.2025 - TOP SOIL MIX - BUS HUB 234.87 0.00

01.42.62905 SUPPLIES-GROUNDS 234.87 08.07.2025 - TOP SOIL MIX - BU 2508-023236 Invoice 08/07/2025 08.07.2025 - TOPSOIL MIX - BUS STOP 234.87 0.00

01.42.62905 SUPPLIES-GROUNDS 234.87 08.07.2025 - TOPSOIL MIX - BUS 2508-025505 Invoice 08/12/2025 08.12.2025 - TOPSOIL MIX - BUS STOP 241.03 0.00

01.42.62905 SUPPLIES-GROUNDS 241.03 08.12.2025 - TOPSOIL MIX - BUS 01534 Christine O'Rourke 08/21/2025 100338 Regular 0.00 8,451.55 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 999 Invoice 08/12/2025 08.12.2025 - GENERAL PLAN UPDATE - JU 8,451.55 0.00

01.18.61150 OUTSIDE SERVICES-OTHE 8,451.55 08.12.2025 - GENERAL PLAN UP 02581 CSG Consultants 08/21/2025 100339 Regular 0.00 2,580.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount B251043 Invoice 08/01/2025 08.01.2025 - BUILDING PLAN REVIEW SVC 2,580.50 0.00

01.19.61150 OUTSIDE SERVICES-OTHE 2,580.50 08.01.2025 - BUILDING PLAN RE 03853 Dana V. Beck 08/21/2025 100340 Regular 0.00 7,200.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount RVFH INVOICE 15 Invoice 08/01/2025 08.01.2025 - RVFH20 ONSITE PROJECT M 7,200.00 0.00

15.32.63100 CONSTRUCTION 7,200.00 08.01.2025 - RVFH20 ONSITE PR 01320 DC Electric Group Inc 08/21/2025 100341 Regular 0.00 10,661.53 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 475906 Invoice 12/31/2024 12.31.2024 - M1008 TS RESPONSE - DEC 2 1,422.20 0.00

01.42.61707 UTILITIES-SIGNALS 1,422.20 12.31.2024 - M1008 TS RESPON 476089 Invoice 01/31/2025 01.31.2025 - M1008 TS RESPONSE - JAN 2 783.92 0.00

01.42.61707 UTILITIES-SIGNALS 783.92 01.31.2025 - M1008 TS RESPON 476859 Invoice 04/30/2025 04.30.2025 - M1007 TS ROUTINE - APR 20 2,336.22 0.00

01.42.61707 UTILITIES-SIGNALS 2,336.22 04.30.2025 - M1007 TS ROUTIN 476918 Invoice 04/30/2025 04.30.2025 - M1008 TS RESPONSE - APR 2 6,119.19 0.00

01.42.61707 UTILITIES-SIGNALS 6,119.19 04.30.2025 - M1008 TS RESPON 03194 East Bay Tire Co 08/21/2025 100342 Regular 0.00 1,031.55 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
68 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 14 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2165678 Invoice 08/11/2025 08.11.2025 - JOHN DEERE TIRES 1,031.55 0.00

01.42.62988 VEHICLE-FUEL/OIL/TIRES 1,031.55 08.11.2025 - JOHN DEERE TIRES 00266 Edwin P Gurka, Jr 08/21/2025 100343 Regular 0.00 430.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 18-2025 Invoice 08/06/2025 08.06.2025 - ARBORIST SERVICES - JUL/A 430.00 0.00

01.42.61105 OUTSIDE SERVICES-TREES 430.00 08.06.2025 - ARBORIST SERVICE 00087 Elite Tree Service 08/21/2025 100344 Regular 0.00 16,630.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2025-8-2 Invoice 08/01/2025 08.01.2025 - FIRE CLEARANCE - WEEDWH 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 08.01.2025 - FIRE CLEARANCE - 2025-8-3 Invoice 08/01/2025 08.01.2025 - FIRE CLEARANCE - MADRON 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 08.01.2025 - FIRE CLEARANCE - 2025-8-5 Invoice 08/08/2025 08.08.2025 - FIRE CLEARANCE - CENTER/ 2,230.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,230.00 08.08.2025 - FIRE CLEARANCE - 2025-8-6 Invoice 08/08/2025 08.08.2025 - FIRE CLEARANCE - CENTER/ 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 08.08.2025 - FIRE CLEARANCE - 2025-8-7 Invoice 08/08/2025 08.08.2025 - FIRE CLEARANCE - CENTER/ 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 08.08.2025 - FIRE CLEARANCE - 2025-8-8 Invoice 08/08/2025 08.08.2025 - FIRE CLEARANCE - CENTER/ 2,880.00 0.00

35.41.61150 OUTSIDE SERVICES-OTHE 2,880.00 08.08.2025 - FIRE CLEARANCE - 00240 Erik Johannson 08/21/2025 100345 Regular 0.00 16,940.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015166 Invoice 08/07/2025 08.07.2025 - CANON SWIM + TENNIS FY2 15,092.00 0.00

21.63.61183 CAMP SPORTS SERVICES 15,092.00 08.07.2025 - CANON SWIM + TE INV0015170 Invoice 06/30/2025 08.07.2025 - CANON SWIM + TENNIS FY2 1,848.00 0.00

21.63.61183 CAMP SPORTS SERVICES 1,848.00 08.2
00017 Fairfax Building Supply Co. Inc. 08/21/2025 100346 Regular 0.00 282.72 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 300515 Invoice 07/31/2025 07.31.2025 - FERTILIZER/GLOVES 28.74 0.00

95.41.61150 OUTSIDE SERVICES-OTHE 28.74 07.31.2025 - FERTILIZER/GLOVE 300682 Invoice 08/04/2025 08.04.2025 - TOWN HALL BATHROOM HA 44.30 0.00

41.41.61150 OUTSIDE SERVICES-OTHE 44.30 08.04.2025 - TOWN HALL BATH 300917 Invoice 08/10/2025 08.10.2025 - FLOWER BASKET FERTILIZER 41.81 0.00

95.41.61150 OUTSIDE SERVICES-OTHE 41.81 08.10.2025 - FLOWER BASKET F 300947 Invoice 08/11/2025 08.11.2025 - HILLDALE PARK - GATE HARD 96.85 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 96.85 08.11.2025 - HILLDALE PARK - G 301046 Invoice 08/13/2025 08.13.2025 - LUMBER 71.02 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 71.02 08.13.2025 - LUMBER 04043 Fiona O'Sullivan 08/21/2025 100347 Regular 0.00 18,095.14 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015172 Invoice 08/20/2025 08.20.2025 - SOCCER CAMP 18,095.14 0.00

21.63.61183 CAMP SPORTS SERVICES 18,095.14 08.20.2025 - SOCCER CAMP 02278 Gardeners' Guild 08/21/2025 100348 Regular 0.00 6,975.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
69 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 15 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 122003 Invoice 07/01/2025 07.01.2025 - ICC - MAINTENANCE - JUL 20 277.00 0.00

21.65.61507 ICC LANDSCAPING MAINT 277.00 07.01.2025 - ICC - MAINTENANC 122036 Invoice 06/01/2025 06.01.2025 - ICC - MAINTENANCE - JUN 2 277.00 0.00

21.65.61507 ICC LANDSCAPING MAINT 277.00 06.01.2025 - ICC - MAINTENANC 122233 Invoice 08/01/2025 08.01.2025 - SFD MEDIANS - AUG 2025 1,143.00 0.00

01.42.61144 Medians 1,143.00 08.01.2025 - SFD MEDIANS - AU 122270 Invoice 08/01/2025 08.01.2025 - RED HILL MEDIAN - AUG 202 2,461.00 0.00

01.42.61144 Medians 2,461.00 08.01.2025 - RED HILL MEDIAN - 122271 Invoice 08/01/2025 08.01.2025 - IMGTN PK/TH PK/MAG LOT - 2,333.00 0.00

01.81.61104 OUTSIDE SERVICES-GROU 1,166.50 08.01.2025 - IMGTN PK/TH PK/

14.81.61150 OUTSIDE SERVICES-OTHE 08.01.2025 - IMGTN PK/TH PK/ 1,166.50 122335 Invoice 08/01/2025 08.01.2025 - ISABEL COOK CENTER - AUG 277.00 0.00

21.65.61507 ICC LANDSCAPING MAINT 277.00 08.01.2025 - ISABEL COOK CENT 122369 Invoice 07/31/2025 07.31.2025 - IMAGTN PK/MAGNOLIA LOT 207.00 0.00

14.81.61150 OUTSIDE SERVICES-OTHE 207.00 07.31.2025 - IMAGTN PK/MAGN 00021 Good & Clean Company Inc 08/21/2025 100349 Regular 0.00 15,040.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 75715 Invoice 08/06/2025 08.06.2025 - GENERAL CLEANING - JUL 20 13,720.00 0.00

31.41.61501 BLDG. MAINT-JANITORIAL 2,825.00 08.06.2025 - GENERAL CLEANIN

34.41.61501 BLDG. MAINT-JANITORIAL 08.06.2025 - GENERAL CLEANIN 1,775.00

41.41.61501 BLDG. MAINT-JANITORIAL 08.06.2025 - GENERAL CLEANIN 6,705.00

60.14.62903 LIVE ON THE AVENUE 08.06.2025 - GENERAL CLEANIN 2,415.00 75716 Invoice 08/06/2025 08.06.2025 - LOWER TH CLEANING - JUL 2 1,320.00 0.00

41.41.61501 BLDG. MAINT-JANITORIAL 1,320.00 08.06.2025 - LOWER TH CLEANI 02606 Halleh Besharati 08/21/2025 100350 Regular 0.00 11,990.85 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 08112025-3 Invoice 08/11/2025 08.11.2025 - COZY COMPANION WEEK 8 4,410.00 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 4,410.00 08.11.2025 - COZY COMPANION 08182025-2 Invoice 08/18/2025 08.18.2025 - CLAY AND PLAY - WEEK 9 7,580.85 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 7,580.85 08.18.2025 - CLAY AND PLAY - 00020 Hannibal's Inc Electrical Construction 08/21/2025 100351 Regular 0.00 1,724.31 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 25366 Invoice 08/11/2025 08.11.2025 - COUNCIL CHAMBERS OUTLE 1,724.31 0.00

41.41.61150 OUTSIDE SERVICES-OTHE 1,724.31 08.11.2025 - COUNCIL CHAMBE 00022 Jackson's Hardware Inc. 08/21/2025 100352 Regular 0.00 16.38 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 183531 Invoice 08/01/2025 08.01.2025 - CHAINSAW FILE/GUIDE 16.38 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 16.38 08.01.2025 - CHAINSAW FILE/G 03008 Jara, Inc, 08/21/2025 100353 Regular 0.00 1,768.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015165 Invoice 08/20/2025 08.20.2025 - CAMP KIDMARIN MINI/MIG 1,768.50 0.00

21.63.61184 CAMP KIDMARIN MIGHT 1,161.00 08.20.2025 - CAMP KIDMARIN

21.63.61207 CAMP KIDMARIN MINI SE 08.20.2025 - CAMP KIDMARIN 607.50 00586 Jay Nelson 08/21/2025 100354 Regular 0.00 3,860.00 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
70 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 16 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015031 Invoice 06/01/2025 06.26.2025 - HUB TREE LIGHT REPAIRS 3,860.00 0.00

01.81.61150 OUTSIDE SERVICES-OTHE 3,860.00 06.26.2025 - HUB TREE LIGHT R 04037 Kenneth Mayer 08/21/2025 100355 Regular 0.00 2,750.53 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount R16291 Invoice 08/11/2025 08.11.2025 - REFUND - PENALTY/OVERPY 2,750.53 0.00

01.00.48057 PLANNING FEES 2,750.53 08.11.2025 - REFUND - PENALTY 03549 Kid's Choice Camps LLC 08/21/2025 100356 Regular 0.00 4,161.08 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 08182025-1 Invoice 08/18/2025 08.18.2025 - CARPENTRY FOR KIDS - WEE 1,260.00 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 1,260.00 08.18.2025 - CARPENTRY FOR KI INV0015169 Invoice 08/11/2025 08.11.2025 - CARPENTRY FOR KIDS - WEE 2,901.08 0.00

21.63.61186 SPECIALTY CAMPS SERVIC 2,901.08 08.11.2025 - CARPENTRY FOR KI 00115 Kone Inc 08/21/2025 100357 Regular 0.00 3,430.86
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 871760472 Invoice 08/01/2025 08.01.2025 - ELEVATOR MAINT - AUG-OCT 3,430.86 0.00

41.41.61150 OUTSIDE SERVICES-OTHE 3,430.86 08.01.2025 - ELEVATOR MAINT - 04036 Land Construction 08/21/2025 100358 Regular 0.00 400.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount R16246 Invoice 08/05/2025 08.05.2025 - REFUND - ROAD BOND 135 400.00 0.00

01.00.20314 ROAD BOND 400.00 08.05.2025 - REFUND - ROAD B 02579 LTS of Marin 08/21/2025 100359 Regular 0.00 3,333.81 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 1761 Invoice 08/05/2025 08.05.2025 - 2014 CHEVY SILVERADO - AC 3,333.81 0.00

01.81.61602 VEHICLE MAINTENANCE/ 3,333.81 08.05.2025 - 2014 CHEVY SILVE 00377 Luis Quezada 08/21/2025 100360 Regular 0.00 3,629.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015168 Invoice 08/12/2025 08.12.2025 - USA SOCCER CAMPS 3,629.50 0.00

21.63.61183 CAMP SPORTS SERVICES 3,629.50 08.12.2025 - USA SOCCER CAM 00121 Marin I J - 2072661 AD 08/21/2025 100361 Regular 0.00 316.56 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 0001451580 Invoice 07/31/2025 07.31.2025 - COLUMN PUBLIC NOTICES - J 316.56 0.00

01.12.61151 LEGAL NOTICES 316.56 07.31.2025 - COLUMN PUBLIC N 00029 Marin IT 08/21/2025 100362 Regular 0.00 6,720.00
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2025-128386 Invoice 08/06/2025 08.06.2025 - AGREEMENNT HOSTED BAC 1,000.00 0.00

42.21.61150 OUTSIDE SERVICES-OTHE 1,000.00 08.06.2025 - AGREEMENNT HOS 2025-128389 Invoice 08/06/2025 08.06.2025 - AGREEMENT ONSITE SUPPO 5,720.00 0.00

42.21.61150 OUTSIDE SERVICES-OTHE 5,720.00 08.06.2025 - AGREEMENT ONSI 03804 Martin/Martin Inc. 08/21/2025 100363 Regular 0.00 8,728.75 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
71 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 17 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount

24.0770-00008 Invoice 06/05/2025 06.05.2025 - FH20 - DESIGN DEV/CD/CA - 7,818.75 0.00

15.32.63100 CONSTRUCTION 7,818.75 06.05.2025 - FH20 - DESIGN DEV

24.0770-00010 Invoice 08/11/2025 08.11.2025 - FH20 - DESIGN DEV/CD/CA - 910.00 0.00

15.32.63100 CONSTRUCTION 910.00 08.11.2025 - FH20 - DESIGN DEV 03846 Michael E. Alexin 08/21/2025 100364 Regular 0.00 350.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015167 Invoice 08/14/2025 08.14.2025 - COLORIST CONSULTING - ICC 350.00 0.00

21.65.63100 CAPITAL OUTLAY - CONST 350.00 08.14.2025 - COLORIST CONSUL 03368 Munselle Civil Engineering 08/21/2025 100365 Regular 0.00 2,040.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 44750 Invoice 07/31/2025 07.31.2025 - THIRD PARTY PLAN REVIEW 2,040.00 0.00

01.00.20340 PERMIT DEPOSITS 2,040.00 07.31.2025 - THIRD PARTY PLAN 03698 Newton Oldfather 08/21/2025 100366 Regular 0.00 5,750.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount R16263 Invoice 08/13/2025 08.13.2025 - REFUND - ROAD BOND 68 S 5,750.00 0.00

01.00.20314 ROAD BOND 5,750.00 08.13.2025 - REFUND - ROAD B 03524 Northwest Cascade, Inc. 08/21/2025 100367 Regular 0.00 3,138.41 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 0555014714 Invoice 07/29/2025 07.29.2025 - UNIT RENTALS - 07.29.25-08. 3,138.41 0.00

01.81.61150 OUTSIDE SERVICES-OTHE 1,046.00 07.29.2025 - UNIT RENTALS - 07

60.14.62903 LIVE ON THE AVENUE 07.29.2025 - UNIT RENTALS - 07 2,092.41 03211 ODP Business Solutions LLC 08/21/2025 100368 Regular 0.00 231.33 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 432549599001 Invoice 07/23/2025 07.23.2025 - LIBRARY - DOORSTOP 28.63 0.00

01.71.62200 DEPARTMENTAL SUPPLIE 28.63 07.23.2025 - LIBRARY - DOORST 432549986001 Invoice 07/23/2025 07.23.2025 - LIBRARY - DISH DETERGENT 38.30 0.00

01.71.62200 DEPARTMENTAL SUPPLIE 38.30 07.23.2025 - LIBRARY - DISH DE 433591044001 Invoice 08/08/2025 08.08.2025 - ADMIN - ENVELOPES & PAPE 164.40 0.00

01.12.62000 OFFICE SUPPLIES 164.40 08.08.2025 - ADMIN - ENVELOP 00992 OverDrive Inc. 08/21/2025 100369 Regular 0.00 678.95 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 02883CO252433 Invoice 08/06/2025 08.06.2025 - LIBRARY - AUDOBOOKS/EBO 678.95 0.00

27.71.62309 E BOOKS 678.95 08.06.2025 - LIBRARY - AUDOBO 03884 Pacific Mobile Structures, Inc. 08/21/2025 100370 Regular 0.00 6,116.91 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV-00475199 Invoice 09/01/2025 09.01.2025 - FH20 TEMP FACILTIES - SEP 2 6,116.91 0.00

15.32.63100 CONSTRUCTION 6,116.91 09.01.2025 - FH20 TEMP FACILTI 04038 Pacific States Petroleum, Inc. 08/21/2025 100371 Regular 0.00 1,708.73 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 2336038-IN Invoice 05/19/2025 05.19.2025 - UNLEADED 87 - 350 GAL 1,708.73 0.00

01.42.62988 VEHICLE-FUEL/OIL/TIRES 1,708.73 05.19.2025 - UNLEADED 87 - 35 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
72 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 18 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number 03523 Parametrix, Inc 08/21/2025 100372 Regular 0.00 382.50 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 69697 Invoice 08/08/2025 08.08.2025 - CONSTRUCTION SUPPORT S 382.50 0.00

14.41.63123 CAPITAL OUTLAY - SIGNAL 382.50 08.08.2025 - CONSTRUCTION S 02554 Parkmobile LLC 08/21/2025 100373 Regular 0.00 3,631.20 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV-US032-2025- Invoice 07/31/2025 07.31.2025 - END USER FEES - JUL 2025 3,631.20 0.00

13.42.61114 OUTSIDE SRV: PARKING 3,631.20 07.31.2025 - END USER FEES - J 01139 Phillips Seabrook Associates 08/21/2025 100374 Regular 0.00 880.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 250315 Invoice 08/07/2025 08.07.2025 - FH20 - CASP INSPECTIONS - J 880.00 0.00

15.32.63100 CONSTRUCTION 880.00 08.07.2025 - FH20 - CASP INSPE 00038 Rafael Lumber 08/21/2025 100375 Regular 0.00 74.57 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 104890 Invoice 07/30/2025 07.30.2025 - ICC - FLOODLIGHT/LUMBER 74.57 0.00

31.41.61506 BLDG. MAINT-OTHER 74.57 07.30.2025 - ICC - FLOODLIGHT/ 03835 Ralph Wedge 08/21/2025 100376 Regular 0.00 551.25 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015162 Invoice 08/07/2025 08.07.2025 - FH20 - DWG/SPECS REVIEW 551.25 0.00

15.32.63100 CONSTRUCTION 551.25 08.07.2025 - FH20 - DWG/SPECS 03346 Sage Energy Consulting - NV5 Inc. 08/21/2025 100377 Regular 0.00 2,363.75 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 465767 Invoice 08/13/2025 08.13.2025 - MUNI RESILIENCY CENTER - 2,363.75 0.00

15.90.63100 CONSTRUCTION 2,363.75 08.13.2025 - MUNI RESILIENCY 03304 Scott Fletcher 08/21/2025 100378 Regular 0.00 125.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015163 Invoice 08/13/2025 08.13.2025 - HONORARIUM - AUTHOR TA 125.00 0.00

01.71.61132 OUTSIDE SVCS-PROGRAM 125.00 08.13.2025 - HONORARIUM - A 02936 SMITH'S PEST MANAGEMENT 08/21/2025 100379 Regular 0.00 309.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 355631 Invoice 07/28/2025 07.28.2025 - IMAGINATION PARK - MISC S 309.00 0.00

14.81.61150 OUTSIDE SERVICES-OTHE 309.00 07.28.2025 - IMAGINATION PAR 04041 TeamSnap, Inc. 08/21/2025 100380 Regular 0.00 232.53 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV00091312 Invoice 08/14/2025 08.14.2025 - COACHES TRAINING - 2025 Y 232.53 0.00

21.61.61164 SOCCER SERVICES 232.53 08.14.2025 - COACHES TRAININ 00215 Transbay Lock 08/21/2025 100381 Regular 0.00 145.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 94114 Invoice 07/31/2025 07.31.2025 - TOWN HALL LOCK REPROGR 145.00 0.00

41.41.61150 OUTSIDE SERVICES-OTHE 145.00 07.31.2025 - TOWN HALL LOCK 00033 Water Components & Building Supply 08/21/2025 100382 Regular 0.00 1,294.85 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
73 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 19 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 30669673 Invoice 07/31/2025 07.31.2025 - LIBRARY - CHANNELS/GRATE 204.02 0.00

15.41.63122 BIKE AND PEDESTRIAL CO 2,228.95 07.31.2025 - LIBRARY - CHANNE

15.41.63122 BIKE AND PEDESTRIAL CO CREDIT MEMO #30669739 -2,024.93 30669674 Invoice 07/31/2025 07.31.2025 - PAINTHOLDER 145.74 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 145.74 07.31.2025 - PAINTHOLDER 30670003 Invoice 08/05/2025 08.05.2025 - BUS STOP - MIRADRAIN 128.78 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 128.78 08.05.2025 - BUS STOP - MIRAD 30670545 Invoice 08/12/2025 08.12.2025 - HDPE PIPES 787.88 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 787.88 08.12.2025 - HDPE PIPES 30670548 Invoice 08/12/2025 08.12.2025 - STRAP RATCHET 28.43 0.00

01.81.62200 DEPARTMENTAL SUPPLIE 28.43 08.12.2025 - STRAP RATCHET 03454 Willdan Engineering 08/21/2025 100383 Regular 0.00 7,271.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 010-63050 Invoice 08/18/2025 08.18.2025 - COST ALLCTN PLN/COMP CO 7,271.00 0.00

01.12.61150 OUTSIDE SERVICES-OTHE 7,271.00 08.18.2025 - COST ALLCTN PLN/ 03052 ZUMAR 08/21/2025 100384 Regular 0.00 501.58
Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 10897 Invoice 07/31/2025 07.31.2025 - ONE WAY ARROWS 501.58 0.00

01.42.62200 DEPARTMENTAL SUPPLIE 501.58 07.31.2025 - ONE WAY ARROWS 00007 Bay Cities Joint Power Insurance Authority 08/11/2025 DFT06206 Bank Draft 0.00 716,603.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount BCJPIA-0020-202 Invoice 07/02/2025 07.02.2025 - 2025-2026 ANNUAL DEPOSI 716,603.00 0.00

40.21.60201 WORKERS COMPENSATIO 200,917.00 07.02.2025 - 2025-2026 ANNUA

40.21.60201 WORKERS COMPENSATIO 07.02.2025 - 2025-2026 ANNUA 15,000.00

40.21.61153 LIABILITY INSURANCE PRE 07.02.2025 - 2025-2026 ANNUA 350,614.00

40.21.61153 LIABILITY INSURANCE PRE 07.02.2025 - 2025-2026 ANNUA 127,366.00

40.21.61188 Cyber Liability Program Pr 07.02.2025 - 2025-2026 ANNUA 22,706.00 00362 Town of San Anselmo 08/06/2025 DFT06290 Bank Draft 0.00 361,445.60 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015029 Invoice 08/06/2025 8-15-2025 TSA To Fund Payroll 361,445.60 0.00

01.00.20299 PAYROLL PAYABLE 245,927.32 8-15-2025 TSA To Fund Payroll

01.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 3,519.60

01.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 482.11

01.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll -1,280.38

13.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 730.67

13.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll -1.38

15.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 11,599.61

15.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll -41.25

19.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 13,742.59

21.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 75,794.85

27.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 7,059.44

31.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 378.41

34.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 378.41

41.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 378.50

42.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 710.22

95.00.20299 PAYROLL PAYABLE 8-15-2025 TSA To Fund Payroll 2,066.88 00072 Comcast 08/05/2025 DFT06291 Bank Draft 0.00 162.20 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
74 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 20 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 426-08052025 Invoice 08/05/2025 426 - CREEK CAMERA - 07.14.25-08.13.25 162.20 0.00

42.21.61150 OUTSIDE SERVICES-OTHE 162.20 426 - CREEK CAMERA - 07.14.25 00181 Ross Valley Fire Department 08/18/2025 DFT06292 Bank Draft 0.00 515,037.10 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015030 Invoice 08/18/2025 08.18.2025 - RVFD MEMBER CONTRIBUTI 515,037.10 0.00

01.32.61139 RVFS CONTRACT 491,482.68 08.18.2025 - RVFD MEMBER CO

15.32.61150 OUTSIDE SERVICES-OTHE 08.18.2025 - RVFD MEMBER CO 23,554.42 03344 CSG Forte Payments Inc. 08/10/2025 DFT06294 Bank Draft 0.00 1,179.33 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 0014014822 Invoice 07/31/2025 07.31.2025 - REC DEPT - CREDIT CARD PR 1,179.33 0.00

21.65.61177 PROCESSING FEES 1,179.33 07.31.2025 - REC DEPT - CREDIT 03344 CSG Forte Payments Inc. 08/10/2025 DFT06295 Bank Draft 0.00 443.85 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 0014014516 Invoice 07/31/2025 07.31.2025 - REC DEPT - CREDIT CARD PR 443.85 0.00

21.65.61177 PROCESSING FEES 443.85 07.31.2025 - REC DEPT - CREDIT 00128 Pacific Gas & Electric 08/12/2025 DFT06296 Bank Draft 0.00 1,035.91 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 355-08122025 Invoice 08/12/2025 355 - CORPYARD UTILITIES - 07.02.25-08.0 1,035.91 0.00

41.41.61701 UTILITIES 1,035.91 355 - CORPYARD UTILITIES - 07. 00128 Pacific Gas & Electric 08/11/2025 DFT06297 Bank Draft 0.00 10.47 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 717-08112025 Invoice 08/11/2025 717 - CORPYARD UTILITIES - 07.04.25-08.0 10.47 0.00

41.41.61701 UTILITIES 10.47 717 - CORPYARD UTILITIES - 07. 00072 Comcast 08/11/2025 DFT06300 Bank Draft 0.00 266.16 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 583-08112025 Invoice 08/11/2025 583 - CORPYARD INTERNET - 07.21.25-08. 266.16 0.00

41.41.61701 UTILITIES 266.16 583 - CORPYARD INTERNET - 07. 00128 Pacific Gas & Electric 08/15/2025 DFT06301 Bank Draft 0.00 2,003.44 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 146-08152025 Invoice 08/15/2025 146 - EV CHARGING - 07.06.25-08.05.25 2,003.44 0.00

13.42.61114 OUTSIDE SRV: PARKING 2,003.44 146 - EV CHARGING - 07.06.25-0 00128 Pacific Gas & Electric 08/28/2025 DFT06302 Bank Draft 0.00 170.94 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount 216-08282025 Invoice 08/28/2025 216 - IMAGINATION PARK - 07.06.25-08.0 170.94 0.00

14.81.61701 UTILITIES-ELECTRICITY 170.94 216 - IMAGINATION PARK - 07.0 00089 Employment Development Department 08/13/2025 DFT06303 Bank Draft 0.00 6,014.00 Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount L1799721936 Invoice 06/30/2025 07.30.2025 - EMPLOYMENT TAX 6,014.00 0.00

40.21.61908 STATE UNEMPLOYMENT I 6,014.00 07.30.2025 - EMPLOYMENT TAX 00362 Town of San Anselmo 08/21/2025 DFT06325 Bank Draft 0.00 296,474.88 ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
75 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 21 of 22
Vendor Number Vendor Name Payment Date Discount Amount Payment Type Payment Amount Number Account Number Account Name Item Description Distribution Amount Payable # Post Date Payable Description Payable Amount Payable Type Discount Amount INV0015194 Invoice 08/21/2025 8.31.2025 TSA To Fund Payroll 296,474.88 0.00

01.00.20299 PAYROLL PAYABLE 202,395.66 8.31.2025 TSA To Fund Payroll

01.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 3,519.60

01.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 482.11

01.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll -1,280.38

13.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 560.90

13.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll -1.38

15.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 9,509.79

15.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll -41.25

19.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 11,982.51

21.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 61,496.20

27.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 4,409.75

31.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 221.62

34.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 221.62

41.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 221.64

42.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 838.79

95.00.20299 PAYROLL PAYABLE 8.31.2025 TSA To Fund Payroll 1,937.70 Regular Checks
Manual Checks
Voided Checks
Discount
Payment
Payment Type Count
Bank Code AP Summary
Bank Drafts
EFT's
125
0 2
13 0

0.00 0.00

0.00 0.00

0.00 140 0.00
Payment
893,060.11

0.00 0.00
1,900,846.88

0.00 2,793,906.99
Payable
Count
256
0 0
13 0
269
ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
76 Check Report Date Range: 08/01/2025 - 08/31/2025
9/2/2025 12:34:15 PM Page 22 of 22
All Bank Codes Check Summary
Payment Type Discount
Payment
Count Payment
Payable
Count
Regular Checks
Manual Checks
Voided Checks
Bank Drafts
EFT's
125
0 2
13 0

0.00 0.00

0.00 0.00

0.00 140 0.00
893,060.11

0.00 0.00
1,900,846.88

0.00 2,793,906.99
256
0 0
13 0
269
Fund Name Period Amount
Fund Summary
99 POOLED CASH - OPERATING 8/2025 2,793,906.99
2,793,906.99
ITEM 1.4 - ATTACHMENT 1
ITEM 1.4 - ATTACHMENT 1
77 Item #: 1.5

STAFF REPORT
TOWN OF SAN ANSELMO Item #: 1.5
MEETING DATE: September 9, 2025
AGENDA TITLE: Accept the Pedestrian Hybrid Beacon Project at Sir Francis Drake Boulevard and Saunders Avenue
and Authorize Staff to File a Notice of Completion
FROM: Scott Schneider, Asst. Public Works Director
RECOMMENDATION: That the Town Council accepts the Pedestrian Hybrid Beacon Project at Sir Francis Drake Boulevard and Saunders Avenue and authorizes staff to file a Notice of Completion.

BACKGROUND AND DISCUSSION
The Town Council approved the Pedestrian Hybrid Beacon project, also known as a HAWK crossing, at the August 27, 2024 Council meeting, and authorized staff to bid the project.

The Council authorized the Town Manager to award the construction contract to Columbia Electric at the October 8, 2024 meeting. Construction was delayed due to the long lead time required to secure the controller cabinet. When the cabinet was received in late May, the Town suggested delaying construction until school was out for the summer to reduce traffic and pedestrian impacts, and the contractor agreed.

Construction started on June 16, and the signal was activated on July 14. The construction was completed in mid-August with the completion of the battery backup system.

The project replaced the existing Rectangular Rapid Flashing Beacon on Sir Francis Drake Boulevard at Saunders Avenue with a hybrid beacon (also known as a HAWK signal) that operates with red lights to improve safety.

FISCAL IMPACT
The construction contract was awarded to Columbia Electric, Inc. for $120,759.20.

Change orders for replacement of the previously damaged existing Type 1A pole ($15,495) and additional sidewalk repairs and striping changes ($1,526.29) increased the cost by $17,021.29. The project was completed substantially in accordance with 78 Item #: 1.5
the project plans and specifications, and fully available for use on July 16, 2025. The final construction cost was $137,780.49.

Funding for the project was included in the Town’s 2024/2025 Budget and Work Plan - Grant Fund for $204,000 from the Transportation Authority of Marin. The grant covered the entire design and construction amount, plus $19,201 of staff time.

CEQA ANDCLIMATE ACTION PLAN/BICYCLE AND PEDESTRIAN

MASTER PLAN CONSISTENCY
The Town found this project to be categorically exempt from the requirement for the preparation of environmental documents under the California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15301 Class 1, because they involve rehabilitation of existing streets, sidewalks, and gutters that will not create additional automobile lanes and involve negligible or no expansion of use. (14 Cal. Code Regs. § 15301). None of the exceptions to this Class 1 categorical exemption apply in this instance (14 Cal. Code Regs. § 15300.2). Specifically, successive projects of the same type in the same location will not cause significant cumulative impacts, as there are no successive projects planned at this time. There are no unusual circumstances presented by this project and the project will not result in damage to scenic resources within a designated state scenic highway. Finally, the project will not cause a substantial adverse change in the significance of a historical resource, as no historical resources will be impacted.

This project is listed in the project list of the Bicycle and Pedestrian Master Plan, and will improve the safety of pedestrians and bicyclists crossing the street. The project is consistent with the Climate Action Plan 2030 Transportation Measures T-2 Bicycling and T-3 Walking.

ATTACHMENTS
None
79 1
Agenda Item 2.1

STAFF REPORT
TOWN OF SAN ANSELMO Item #: 2.1
MEETING DATE: September 9, 2025
AGENDA TITLE: Public Hearing, Discussion, and Potential Introduction of an Ordinance Amending Title 9, Chapter 1 (Construction
Codes) and Chapter 19 (Green Building Requirements) to
Implement the 2025 Tier 1 CALGreen Building Code; and
finding that the Council’s action is not a “project” under CEQA (Cal. Pub. Res. Code § 21065)
FROM: Bridget Wipfler, Climate Action Coordinator
Eric Robbe, Building Official
Heidi Scoble, Community Development Director

RECOMMENDATION

1. Hold a public hearing to consider a proposed Ordinance amending Title 9, Chapter 1 (Construction Codes) and Chapter 19 (Green Building Requirements) to Implement the 2025 Tier 1 CALGreen Building Code, considering the time constraints established by with Assembly Bill 130; and making associated CEQA finding (Attachment 1).

2. Motion to introduce the Ordinance Amendment by title only and to waive future readings in their entirety.

BACKGROUND AND DISCUSSION
In June, the Governor signed into law Assembly Bill 130, which freezes local jurisdictions’ ability to modify state residential building codes, including “green” and “reach” codes, through June 1, 2031 with certain limited exceptions. The purpose of AB 130 is to encourage and streamline the construction of residential units. Jurisdictions that desire to adopt more stringent green or reach building codes must do so by the state deadline of October 1, 2025.

As explained further below, the Town already has in place certain environmental building codes. Staff has brought this item to the Council for its consideration as to whether it would like to adopt additional building code amendments before the October 1 deadline. 80 2
Agenda Item 2.1
What are Green Building Codes?
The state sets certain minimum building code standards every 3 years, which local jurisdictions must adopt and enforce. The Town Council adopts these codes by reference and they are generally contained in San Anselmo Municipal Code Title 9. The 2025 state building code update will go into effect on January 1, 2026.

Green building codes are a certain type of building code that are designed to reduce environmental impacts. These requirements encourage practices such as:
• Using less energy and water,
• Reducing reliance on fossil fuels,
• Recycling construction waste,
• Improving indoor air quality, and
• Supporting healthier, more resilient communities.

California’s statewide green building code, known as CALGreen (Title 24, Part 11), was first adopted in 2010 and is updated every three years.

In addition to “green” building codes, “reach” codes, may be adopted locally to go beyond the state regulations to reflect local priorities, such as wildfire risk, seismic safety, or climate action goals.

Until recently, local jurisdictions have been authorized to adopt local amendments to the state building codes based on localized conditions and priorities. However, effective October 1, 2025, AB 130 pauses local jurisdictions’ ability to modify building codes (including green building and reach codes) in order to encourage housing development.

State Moratorium on Local Residential Green Building Codes Through June 1, 2031 AB 130 establishes a statewide moratorium on new or amended residential building standards from October 1, 2025, through June 1, 2031, with limited exceptions for emergency health and safety measures, fire hardening, and standards equivalent to those in effect as of January 1, 2025. The law also suspends the State Building Standards Commission’s approval of residential code amendments during this period. However, the 2025 California Building Standards Code, released in July 2025, will take effect as scheduled on January 1, 2026, providing a narrow window for local jurisdictions to adopt or amend residential codes, including reach codes, before the moratorium begins.

Given the constraints of AB 130 and the late release of the 2025 CALGreen Code, the Town faces an unusually short timeline to consider, review, analyze, and adopt local amendments. After October 1, 2025, no new residential building standards, including reach codes, may be adopted until 2031. This compressed timeline limits opportunities 81 3
Agenda Item 2.1
for technical analysis and public outreach. Nonetheless, the Town may adopt advanced measures before October 1, 2025, with the option to adjust or relax them based on future findings or community input.

Green Building Requirements in San Anselmo
During the 2022 California Building Code updates, the Town elected to adopt the state’s CALGreen Tier 1 standards. The Tier 1 framework allows San Anselmo to go beyond the base code using a package of enhancements consistent with other jurisdictions. In addition, as described below, the Town relies on its local Green Building Ordinance for enhanced energy standards, which provides more flexible compliance pathways.

Current 2022 Tier 1 Measures Enforced in San Anselmo:
• EV-capable wiring
• Construction waste diversion
• Water efficiency
• Electrification measures
In September 2023, San Anselmo also adopted local green building standards and reach codes. For example, the Town adopted Ordinance No. 1181, incorporating Marin County’s Flexible Compliance Pathway (FlexPath) for remodels. FlexPath allows projects to achieve a target score by selecting from a menu of energy efficiency and electrification measures, giving builders and homeowners flexibility to implement measures that best suit their project.
2025 State Green Building Code
2025 Statewide Mandatory Green Building Measures (without Tier 1) (“CalGreen”):
• EV-ready wiring for single-family homes
• Higher Electric Vehicle Supply Equipment (EVSE) requirements for multifamily and nonresidential buildings
• Embodied carbon compliance for large projects
• Bicycle parking (multifamily & nonresidential)
• Heat pump and photovoltaic baselines in the energy code See the Comparison Table of the 2022 Tier 1 vs. 2025 Mandatory CalGreen and 2025 Tier 1 Measures on the following page:
82 4
Agenda Item 2.1
83 5
Agenda Item 2.1
The transition from 2022 Tier 1 to 2025 Tier 1 is expected to have minimal cost impacts for most residential projects, as many new measures, such as bicycle parking and inspection responsibilities, do not involve major construction changes. Multifamily and nonresidential projects may see higher upfront costs, particularly for EVSE upgrades, embodied carbon compliance, and structural retention requirements, but these measures can generate long-term energy and operational savings.

Policy Options for Council
Considering the Town’s current Green Building regulations and the mandatory 2025 Green Building requirements, to further strengthen San Anselmo’s commitment to climate action leadership, the Council may consider the following options:

1. Adopt the 2025 CALGreen Tier 1 Measures
• Continues San Anselmo’s leadership on climate action. • Aligns with nearby cities (San Rafael, Mill Valley, Larkspur, and Tiburon) and the County of Marin that are also moving to Tier 1.
• May increase costs for some projects, with the most significant upfront expenses typically for multifamily and nonresidential buildings, primarily due to EV infrastructure and HVAC requirements.

2. Exempt Accessory Dwelling Units (ADUs) from Tier 1
• Reduces costs for small-scale infill housing projects. • Decreases the number of ADUs contributing to climate goals.

3. Maintain or Lower the Remodel Threshold
• Current trigger: 750 square feet.
• Some neighboring jurisdictions are lowering to 500 square feet. • Staff recommends keeping the 750 square foot threshold to avoid disproportionate costs for small remodels.

4. Modify the Flexible Compliance Pathway (FlexPath)
• Could limit FlexPath requirements to homes built before 1992 and because federal incentives for newer homes are expiring. Post-1992 homes are already relatively efficient due to the Title 24 building standards, so the largest climate and cost benefits come from targeting older homes.
• Reduce staff time and complexity for builders of newer homes, since those homes often already comply with modern energy and building standards.

5. Continue Using the 2022 Tier 1 Flexible Compliance Pathway (FlexPath) • Maintains consistency with the Town’s current approach by carrying forward the 2022 Tier 1 FlexPath into the next Building Code cycle. 84 6
Agenda Item 2.1

6. Continue Using the 2022 Tier 1 Flexible Compliance Pathway (FlexPath) with modification to Exempt ADUs and homes built after 1992. • Maintains consistency with the Town’s current approach by carrying forward the 2022 Tier 1 FlexPath into the next Building Code cycle. • Exempts ADUs, reducing costs for small-scale infill housing projects. • Limits FlexPath requirements to homes built before 1992, focusing on properties with the greatest potential for energy and emissions reduction.

What are other Marin jurisdictions doing?
85 7
Agenda Item 2.1
In summary, staff is requesting that the Town Council consider adopting the 2025 CALGreen Tier 1 Code along with the Town’s local reach code. (See proposed Ordinance Amendment at Attachment 1).

Based on preliminary review, the 2025 amendments are anticipated to have minimal impacts on single-family residences compared to the existing 2022 Tier 1 standards.

However, they may result in greater financial impacts for multifamily and nonresidential projects, particularly due to requirements related to EV infrastructure, embodied carbon compliance, and structural retention.

As a cautious approach, and consistent with the Town’s commitment to green building, the Council may choose to adopt the 2025 Tier 1 regulations at this time. If the requirements later prove to be overly burdensome or do not achieve the intended outcomes, the Council retains the ability to amend the standards to make them less stringent or to suspend them altogether. Under AB 130, such adjustments can be made with relative ease. However, AB 130 prohibits strengthening the regulations or adding enhanced green building requirements after June 1, 2031. In other words, if the Town Council does not adopt the 2025 CalGreen Tier 1 before October 1, it will not have the opportunity to adopt more stringent regulations for at least six years.

If the Council elects to adopt the ordinance, staff recommends:
• Exempting Accessory Dwelling Units (ADUs) from Tier 1 requirements, • Exempting new construction for homes built after 1992, and • Maintaining the current 750-square-foot remodel threshold for Flex Path applicability.

This approach balances the Town’s climate leadership goals with cost considerations and regulatory flexibility for property owners.

The proposed Ordinance Amendment includes these recommendations. In addition, the proposed Ordinance Amendment includes with the findings required to enact local amendments and modifications to state building standards (Cal Health & Safety Code §§ 17958, 17958.5, 17958.7 and 1894.5).

FISCAL IMPACT
No direct Town costs beyond staff review/enforcement.

GENERAL PLAN CONSISTENCY
If the Council adopts the proposed Green Building regulation amendments, the Ordinance will advance the goals and policies of the San Anselmo General Plan, particularly those related to Sustainability and Conservation. The General Plan emphasizes reducing 86 8
Agenda Item 2.1
greenhouse gas emissions, improving energy and water efficiency, encouraging renewable energy, and promoting sustainable building practices.

Adoption of this Ordinance will support these objectives by:
• Requiring higher-performance building standards,
• Supporting implementation of the Town’s Climate Action Plan, and • Ensuring consistency with regional and statewide sustainability efforts.

Specifically, the Ordinance aligns with:
• Policy M13: The Town and County shall take measures to reduce inefficient or unnecessary energy or natural resource consumption. Recyclable and biodegradable materials shall be utilized, and used materials shall be recycled or reused whenever possible.
• Policy M1: Air, water, and noise pollution shall be prevented or minimized.

CEQA AND CLIMATE ACTION PLAN CONCISTENCY
The Council’s consideration of the 2025 Building Code does not constitute a “project” under the California Environmental Quality Act (CEQA), as it does not involve an activity that could cause a direct or reasonably foreseeable indirect physical change to the environment (Cal. Pub. Res. Code § 21065).

This report is consistent with the Town’s adopted Climate Action Plan (CAP), particularly measures related to building decarbonization, electric vehicle readiness, active transportation, and reach codes, including:
• E-4: Green Building Reach Code – Explore adopting a green building ordinance for new and remodeled residential and commercial projects that requires methods and efficiency standards exceeding State codes. This includes consideration of photovoltaic systems and all-electric building systems, modeled after the County’s green building ordinance.

ATTACHMENTS

1. Draft Ordinance Redline

2. Application of the 2022 Studies to the 2025 Energy Code

3. California Energy 2022 Cost-Effectiveness Study- Existing Single Family Building Upgrades
87 88
89 90
91 92
93 94
95 96
97 98
99 100
101
102
103
104
105
106
107
108
109
110
111
112
113
Application of the 2022
Studies to the 2025
Energy Code:

Existing Single Family
Building Upgrades
Prepared by:

Frontier Energy, Inc
Misti Bruceri & Associates, LLC
Prepared for:

Kelly Cunningham, Codes and
Standards Program, Pacific Gas
and Electric
Revision: 1.0
Last modified: 2025/08/15
114
2025 Energy Code: Existing Single Family Building Upgrades 1 2025/08/15
Table 1 Summary of Revisions
Date Description Reference (page or section)
8/15/2025 Original Release N/A
Legal Notice
This report was prepared by
Pacific Gas and Electric Company
and funded by the California utility
customers under the auspices of
the California Public Utilities
Commission.

Copyright 2025, Pacific Gas and
Electric Company. All rights
reserved, except that this
document may be used, copied,
and distributed without
modification.

Neither PG&E nor any of its
employees makes any warranty,
express or implied; or assumes
any legal liability or responsibility
for the accuracy, completeness or
usefulness of any data,
information, method, product,
policy or process disclosed in this
document; or represents that its
use will not infringe any privatelyowned rights including, but not limited to, patents, trademarks or
copyrights.
115
2025 Energy Code: Existing Single Family Building Upgrades 2 2025/08/15
Acronym List
B/C – Lifecycle Benefit-to-Cost
Ratio
CASE – Codes and Standards
Enhancement
CFL – Compact Fluorescent
Lamps
CPAU – City of Palo Alto Utilities
CPUC – California Public Utilities
Commission
CZ – California Climate Zone
kWh – Kilowatt Hour
NPV – Net Present Value
PG&E – Pacific Gas and Electric
Company
PV – Photovoltaic
SCE – Southern California
Edison
SDG&E – San Diego Gas and
Electric
SMUD – Sacramento Municipal
Utility District
SoCalGas – Southern California
Gas Company
Therm – Unit for quantity of heat
that equals 100,000 British
thermal units
116
2025 Energy Code: Existing Single Family Building Upgrades 1 2025/08/15
Table of Contents
1 Summary ......................................................................................................................2 2 Air Sealing at the Ceiling.............................................................................................4 3 Lighting Measures .....................................................................................................10 4 Water Heating Package..............................................................................................14 5 PV................................................................................................................................15 6 References .................................................................................................................22 List of Tables
Table 1 Summary of Revisions............................................................................................. 1 Table 2. [Pre-1978] Air Sealing at the Ceiling (Std)............................................................... 4 Table 3. [1978-1991] Air Sealing at the Ceiling (Std) ............................................................ 5 Table 4. [1992-2010] Air Sealing at the Ceiling (Std) ............................................................ 6 Table 5. [Pre-1978] Air Sealing at the Ceiling (CARE) .......................................................... 7 Table 6. [1978-1991] Air Sealing at the Ceiling (CARE)........................................................ 8 Table 7. [1991-2010] Air Sealing at the Ceiling (CARE)........................................................ 9 Table 8. [All Vintages] LED Lamp vs. CFL...........................................................................11 Table 9. [All Vintages] Exterior Photosensor........................................................................12 Table 10. [All Vintages] LED and Photosensor ....................................................................13 Table 11. [All Vintages] Water Heating Package..................................................................14 Table 12. [Pre-1978] 3 kW PV without Solar Tax Credit (Std) ..............................................16 Table 13. [1978-1991] 3 kW PV without Solar Tax Credit (Std)...........................................17 Table 14. [1992-2010] 3 kW PV without Solar Tax Credit (Std)............................................18 Table 15. [Pre-1978] 3 kW PV without Solar Tax Credit (CARE)..........................................19 Table 16. [1978-1991] 3 kW PV without Solar Tax Credit (CARE) .......................................20 Table 17. [1992-2010] 3 kW PV without Solar Tax Credit (CARE) .......................................21 List of Figures
No table of figures entries found.
117
2025 Energy Code: Existing Single Family Building Upgrades 2 2025/08/15
1 Summary
The California Codes and Standards (C&S) Reach Codes program provides technical support to local governments considering adopting a local ordinance (reach code) intended to support meeting local and/or statewide energy efficiency and greenhouse gas reduction goals. The program facilitates adoption and implementation of the code when requested by local jurisdictions by providing resources such as cost-effectiveness studies, model language, sample findings, and other supporting documentation.

In April 2024, the Statewide Reach Codes Team published the 2022 Cost-Effectiveness Study: Existing Single Family Building Upgrades. This study focuses on existing single family buildings identifying cost-effective measures and measure package upgrades in all 16 California climate zones. The study was conducted to complement Part 6 of the California Building Code (the Energy Code) for the 2022 code cycle, effective January 1, 2023. In the 2019 code cycle the 2019 Cost-Effectiveness Study: Existing Single Family Residential Building Upgrades study included outdoor lighting and a water heater package that was discontinued in the 2022 study but has been brought back in this memo by request from jurisdictions. The studies document the estimated costs, benefits, energy impacts and greenhouse gas emission reductions that may result from implementing an ordinance to help local leadership, residents, and other stakeholders make informed policy decisions.

The Statewide Reach Codes Team reviewed the cost-effectiveness study for impacts of code changes implemented in the 2025 Energy Code. Measures that are now required by code may alter the results presented in the 2022 study. Below is a summary of the changes to the additions and alterations for residential buildings sections of the 2025 Energy Code. • Mandatory wall insulation R-value has been increased from R-13 to R-15. [Section 150.2(a) of the Energy Code]
• Prescriptive window U-factor has decreased from 0.30 to 0.27 in Climate Zones 1-5, 11-14, and 16. [Section 150.2(b)1B of the Energy Code]
The wall insulation measure has been re-evaluated with R-15 instead of R-13. There is generally a slight increase in utility cost savings as expected with the increase in efficiency.

However, there is not a substantial impact on the cost-effectiveness results.

For the prescriptive window U-factor, the original study modeled U-0.28 in all climate zones.

This updated memo drops the U-factor from 0.28 to 0.27 in all climate zones. The SHGC is maintained at 0.23 for climate zone 2, 4, and 6-15 and 0.35 for CZ 1, 3, 5, 16. There is minimal impact on the cost-effectiveness results due to this update. However, there are two instances in the 1978-1991 vintage where cost-effectiveness flips from cost-effective to not cost-effective. Climate zone 4 in PGE territory utilizing standard rates and the modest gas escalation is no longer cost-effective on-bill by the smallest margin. Climate zone 10 in SDGE territory utilizing CARE rates and the modest gas escalation has also become no longer cost-effective on-bill.
118
2025 Energy Code: Existing Single Family Building Upgrades 3 2025/08/15
The 2022 study included a whole building air sealing measure defined as a 30% reduction in air leakage. A new measure – air sealing of the ceiling floor, representing a 14% reduction in air leakage – is added in this memo. Further details and cost-effectiveness results are provided in Section 2.

Lighting measures were previously presented in the 2019 Cost-Effectiveness Study: Existing Single Family Residential Building Upgrades study but were not analyzed in the 2022 study.

Updated cost-effectiveness analysis for this measure is presented in Section 3.

The water heating package measure was previously presented in 2019 Cost-Effectiveness Study: Existing Single Family Residential Building Upgrades study. Updated costeffectiveness analysis for this measure is presented in Section 4.

The 3 kW PV measure from the 2022 study is revised here with an updated costeffectiveness analysis that accounts for the elimination of the Federal Solar tax credit December 31, 2025. Additional details and analysis are provided in Section 5.

The 2022 report, model ordinance language and other resources are posted on the C&S Reach Codes Program website at LocalEnergyCodes.com. Local jurisdictions that are considering adopting an ordinance may contact the program for further technical support at [email protected].
119
2025 Energy Code: Existing Single Family Building Upgrades 4 2025/08/15
2 Air Sealing at the Ceiling
Unlike full air sealing, which has previously been presented, air sealing of the ceiling floor may be an attractive measure for an attic remodel project. The whole building air sealing measure estimated a 30% reduction in air leakage, while air sealing at the ceiling measure results in a 14% reduction in air leakage.

Table 2 through Table 7 present the cost-effectiveness results for the air sealing at the ceiling plane measure. The estimated incremental cost for air sealing at the ceiling plane is $1,963 which is from the 2022 Residential Additions and Alterations CASE Report (Statewide CASE Team, 2020).

Table 2. [Pre-1978] Air Sealing at the Ceiling (Std)
Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
First-year
Utility
Savings
Lifecycle NPV Savings
2025

LSC NPV
On-Bill NPV
Modest Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $1,963 $33 ($465) ($997) ($432)
CZ02 PGE $1,963 $18 ($1,114) ($1,433) ($1,118)
CZ03 PGE $1,963 $17 ($1,180) ($1,463) ($1,171)
CZ04 PGE $1,963 $25 ($1,081) ($1,290) ($979)
CZ04 CPAU $1,963 $21 ($1,081) ($1,379) ($1,069)
CZ05 PGE $1,963 $16 ($1,230) ($1,500) ($1,235)
CZ05 PGE/SCG $1,963 $14 ($1,230) ($1,555) ($1,325)
CZ06 SCE/SCG $1,963 ($2) ($1,797) ($1,987) ($1,937)
CZ07 SDGE $1,963 ($3) ($1,813) ($2,008) ($1,934)
CZ08 SCE/SCG $1,963 $7 ($1,680) ($1,775) ($1,703)
CZ09 SCE/SCG $1,963 $10 ($1,597) ($1,693) ($1,592)
CZ10 SCE/SCG $1,963 $17 ($1,497) ($1,540) ($1,420)
CZ10 SDGE $1,963 $23 ($1,497) ($1,366) ($1,237)
CZ11 PGE $1,963 $32 ($1,014) ($1,120) ($816)
CZ12 PGE $1,963 $22 ($1,147) ($1,348) ($1,064)
CZ12 SMUD/PGE $1,963 $17 ($1,147) ($1,468) ($1,190)
CZ13 PGE $1,963 $31 ($1,114) ($1,162) ($918)
CZ14 SCE/SCG $1,963 $32 ($897) ($1,130) ($832)
CZ14 SDGE $1,963 $42 ($897) ($845) ($519)
CZ15 SCE/SCG $1,963 $40 ($1,297) ($1,041) ($946)
CZ16 PGE $1,963 $30 ($581) ($1,071) ($551)
120
2025 Energy Code: Existing Single Family Building Upgrades 5 2025/08/15
Table 3. [1978-1991] Air Sealing at the Ceiling (Std)
Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
First-year
Utility
Savings
Lifecycle NPV Savings
2025

LSC NPV
On-Bill NPV
Modest Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $1,963 $23 ($931) ($1,292) ($903)
CZ02 PGE $1,963 $13 ($1,364) ($1,570) ($1,341)
CZ03 PGE $1,963 $10 ($1,480) ($1,668) ($1,496)
CZ04 PGE $1,963 $16 ($1,330) ($1,522) ($1,292)
CZ04 CPAU $1,963 $13 ($1,330) ($1,575) ($1,356)
CZ05 PGE $1,963 $11 ($1,447) ($1,649) ($1,466)
CZ05 PGE/SCG $1,963 $10 ($1,447) ($1,684) ($1,522)
CZ06 SCE/SCG $1,963 ($1) ($1,830) ($1,967) ($1,934)
CZ07 SDGE $1,963 ($4) ($1,896) ($2,040) ($1,991)
CZ08 SCE/SCG $1,963 $4 ($1,797) ($1,860) ($1,813)
CZ09 SCE/SCG $1,963 $5 ($1,747) ($1,823) ($1,764)
CZ10 SCE/SCG $1,963 $10 ($1,663) ($1,722) ($1,652)
CZ10 SDGE $1,963 $14 ($1,663) ($1,603) ($1,517)
CZ11 PGE $1,963 $25 ($1,264) ($1,320) ($1,096)
CZ12 PGE $1,963 $16 ($1,380) ($1,520) ($1,314)
CZ12 SMUD/PGE $1,963 $12 ($1,380) ($1,604) ($1,402)
CZ13 PGE $1,963 $23 ($1,364) ($1,373) ($1,199)
CZ14 SCE/SCG $1,963 $22 ($1,230) ($1,397) ($1,182)
CZ14 SDGE $1,963 $28 ($1,230) ($1,212) ($974)
CZ15 SCE/SCG $1,963 $32 ($1,463) ($1,225) ($1,154)
CZ16 PGE $1,963 $21 ($1,014) ($1,357) ($1,001)
121
2025 Energy Code: Existing Single Family Building Upgrades 6 2025/08/15
Table 4. [1992-2010] Air Sealing at the Ceiling (Std)
Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
First-year
Utility
Savings
Lifecycle NPV Savings
2025

LSC NPV
On-Bill NPV
Modest Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $1,963 $14 ($1,314) ($1,550) ($1,309)
CZ02 PGE $1,963 $9 ($1,530) ($1,687) ($1,529)
CZ03 PGE $1,963 $7 ($1,613) ($1,744) ($1,618)
CZ04 PGE $1,963 $11 ($1,530) ($1,653) ($1,501)
CZ04 CPAU $1,963 $9 ($1,530) ($1,701) ($1,557)
CZ05 PGE $1,963 $7 ($1,613) ($1,759) ($1,637)
CZ05 PGE/SCG $1,963 $6 ($1,613) ($1,788) ($1,686)
CZ06 SCE/SCG $1,963 $1 ($1,863) ($1,936) ($1,911)
CZ07 SDGE $1,963 $0 ($1,896) ($1,944) ($1,911)
CZ08 SCE/SCG $1,963 $3 ($1,830) ($1,885) ($1,851)
CZ09 SCE/SCG $1,963 $3 ($1,780) ($1,892) ($1,853)
CZ10 SCE/SCG $1,963 $6 ($1,763) ($1,814) ($1,767)
CZ10 SDGE $1,963 $8 ($1,763) ($1,741) ($1,681)
CZ11 PGE $1,963 $14 ($1,530) ($1,581) ($1,437)
CZ12 PGE $1,963 $10 ($1,580) ($1,693) ($1,560)
CZ12 SMUD/PGE $1,963 $8 ($1,580) ($1,737) ($1,606)
CZ13 PGE $1,963 $12 ($1,580) ($1,643) ($1,531)
CZ14 SCE/SCG $1,963 $12 ($1,530) ($1,639) ($1,503)
CZ14 SDGE $1,963 $16 ($1,530) ($1,537) ($1,382)
CZ15 SCE/SCG $1,963 $17 ($1,680) ($1,572) ($1,532)
CZ16 PGE $1,963 $14 ($1,314) ($1,556) ($1,314)
122
2025 Energy Code: Existing Single Family Building Upgrades 7 2025/08/15
Table 5. [Pre-1978] Air Sealing at the Ceiling (CARE)
Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
First-year
Utility
Savings
Lifecycle NPV Savings
2025

LSC NPV
On-Bill NPV
Modest Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $1,963 $26 ($465) ($1,212) ($766)
CZ02 PGE $1,963 $14 ($1,114) ($1,550) ($1,302)
CZ03 PGE $1,963 $13 ($1,180) ($1,574) ($1,343)
CZ04 PGE $1,963 $18 ($1,081) ($1,459) ($1,216)
CZ04 CPAU $1,963 $0 ($1,081) ($1,963) ($1,963)
CZ05 PGE $1,963 $12 ($1,230) ($1,604) ($1,395)
CZ05 PGE/SCG $1,963 $11 ($1,230) ($1,648) ($1,467)
CZ06 SCE/SCG $1,963 ($1) ($1,797) ($1,969) ($1,928)
CZ07 SDGE $1,963 ($1) ($1,813) ($1,976) ($1,918)
CZ08 SCE/SCG $1,963 $5 ($1,680) ($1,824) ($1,768)
CZ09 SCE/SCG $1,963 $8 ($1,597) ($1,764) ($1,686)
CZ10 SCE/SCG $1,963 $12 ($1,497) ($1,659) ($1,566)
CZ10 SDGE $1,963 $16 ($1,497) ($1,546) ($1,443)
CZ11 PGE $1,963 $23 ($1,014) ($1,353) ($1,116)
CZ12 PGE $1,963 $17 ($1,147) ($1,503) ($1,279)
CZ12 SMUD/PGE $1,963 $11 ($1,147) ($1,623) ($1,406)
CZ13 PGE $1,963 $22 ($1,114) ($1,394) ($1,205)
CZ14 SCE/SCG $1,963 $23 ($897) ($1,352) ($1,120)
CZ14 SDGE $1,963 $30 ($897) ($1,163) ($905)
CZ15 SCE/SCG $1,963 $27 ($1,297) ($1,334) ($1,266)
CZ16 PGE $1,963 $24 ($581) ($1,270) ($859)
123
2025 Energy Code: Existing Single Family Building Upgrades 8 2025/08/15
Table 6. [1978-1991] Air Sealing at the Ceiling (CARE)
Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
First-year
Utility
Savings
Lifecycle NPV Savings
2025

LSC NPV
On-Bill NPV
Modest Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $1,963 $18 ($931) ($1,442) ($1,135)
CZ02 PGE $1,963 $10 ($1,364) ($1,658) ($1,477)
CZ03 PGE $1,963 $8 ($1,480) ($1,734) ($1,598)
CZ04 PGE $1,963 $12 ($1,330) ($1,627) ($1,446)
CZ04 CPAU $1,963 $0 ($1,330) ($1,963) ($1,963)
CZ05 PGE $1,963 $8 ($1,447) ($1,719) ($1,575)
CZ05 PGE/SCG $1,963 $7 ($1,447) ($1,746) ($1,619)
CZ06 SCE/SCG $1,963 ($0) ($1,830) ($1,959) ($1,933)
CZ07 SDGE $1,963 ($2) ($1,896) ($2,003) ($1,964)
CZ08 SCE/SCG $1,963 $3 ($1,797) ($1,886) ($1,848)
CZ09 SCE/SCG $1,963 $4 ($1,747) ($1,859) ($1,813)
CZ10 SCE/SCG $1,963 $7 ($1,663) ($1,790) ($1,736)
CZ10 SDGE $1,963 $10 ($1,663) ($1,710) ($1,641)
CZ11 PGE $1,963 $18 ($1,264) ($1,500) ($1,325)
CZ12 PGE $1,963 $12 ($1,380) ($1,631) ($1,469)
CZ12 SMUD/PGE $1,963 $8 ($1,380) ($1,716) ($1,558)
CZ13 PGE $1,963 $16 ($1,364) ($1,545) ($1,411)
CZ14 SCE/SCG $1,963 $16 ($1,230) ($1,545) ($1,378)
CZ14 SDGE $1,963 $20 ($1,230) ($1,422) ($1,233)
CZ15 SCE/SCG $1,963 $22 ($1,463) ($1,460) ($1,410)
CZ16 PGE $1,963 $16 ($1,014) ($1,491) ($1,211)
124
2025 Energy Code: Existing Single Family Building Upgrades 9 2025/08/15
Table 7. [1991-2010] Air Sealing at the Ceiling (CARE)
Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
First-year
Utility
Savings
Lifecycle NPV Savings
2025

LSC NPV
On-Bill NPV
Modest Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $1,963 $11 ($1,314) ($1,642) ($1,452)
CZ02 PGE $1,963 $7 ($1,530) ($1,749) ($1,625)
CZ03 PGE $1,963 $6 ($1,613) ($1,793) ($1,693)
CZ04 PGE $1,963 $8 ($1,530) ($1,729) ($1,609)
CZ04 CPAU $1,963 $0 ($1,530) ($1,963) ($1,963)
CZ05 PGE $1,963 $5 ($1,613) ($1,804) ($1,708)
CZ05 PGE/SCG $1,963 $5 ($1,613) ($1,827) ($1,747)
CZ06 SCE/SCG $1,963 $1 ($1,863) ($1,940) ($1,920)
CZ07 SDGE $1,963 $0 ($1,896) ($1,944) ($1,918)
CZ08 SCE/SCG $1,963 $2 ($1,830) ($1,905) ($1,879)
CZ09 SCE/SCG $1,963 $2 ($1,780) ($1,908) ($1,878)
CZ10 SCE/SCG $1,963 $4 ($1,763) ($1,855) ($1,819)
CZ10 SDGE $1,963 $6 ($1,763) ($1,805) ($1,758)
CZ11 PGE $1,963 $10 ($1,530) ($1,685) ($1,572)
CZ12 PGE $1,963 $7 ($1,580) ($1,759) ($1,654)
CZ12 SMUD/PGE $1,963 $5 ($1,580) ($1,802) ($1,700)
CZ13 PGE $1,963 $9 ($1,580) ($1,732) ($1,644)
CZ14 SCE/SCG $1,963 $9 ($1,530) ($1,722) ($1,615)
CZ14 SDGE $1,963 $11 ($1,530) ($1,652) ($1,529)
CZ15 SCE/SCG $1,963 $12 ($1,680) ($1,696) ($1,667)
CZ16 PGE $1,963 $11 ($1,314) ($1,645) ($1,454)
125
2025 Energy Code: Existing Single Family Building Upgrades 10 2025/08/15
3 Lighting Measures
LED lighting and exterior lighting control measures were previously evaluated in the 2019 Cost-Effectiveness Study: Existing Single Family Residential Building Upgrades study.

These measures are not included in the 2022 Cost-Effectiveness Study: Existing Single Family Building Upgrades study, but have been re-evaluated and included in this memo.

The updated analysis follows the same methodology as the 2019 study, but with updated costs for equipment and updated utility rates.

The three measures evaluated are LED lighting, exterior photosensor, and LED lighting plus photosensor. Table 8 through Table 10 show the results for the different lighting measures evaluated. Each measure is explained in more detail below.

LED Lighting: Replace screw-in (A-based for lamps) incandescent lamps and compact fluorescent lamps (CFLs) with light-emitting diode (LED) A-lamps. This analysis was conducted external to the energy model and evaluated replacement of a 13 W CFL lamp with an 9.6 W LED lamp operating 620 hours annually. Annual hour estimates were based on whole building average hours of operation from a 2010 lighting study by KEMA (KEMA, 2010). Lifetime assumptions were 10,000 hours for CFLs and 25,000 hours for LED lamps.

For incremental cost calculations it was assumed CFLs have a lifetime of 15 years, are installed five years prior to the retrofit, and would need to be replaced at year ten and 25.

Exterior Lighting Controls/Photosensor: Evaluation of exterior lighting controls was completed on a per-luminaire basis external to the energy model and assumes a screw-in photosensor control is installed in outdoor lighting luminaires. Energy savings of 12.1 kWh per year was applied based on analysis done by the Consortium for Energy Efficiency, assuming LED lamps, 2.6 hours per day of operation, and that photosensor controls reduce operating hours on average 20 percent each day (CEE, 2014). Energy savings will be higher for incandescent or CFL luminaires.

Exterior Lighting Controls/Photosensor+LED: An additional evaluation was completed for exterior lighting controls on a per-luminaire basis external to the energy model and assumes a screw-in photosensor control is installed in outdoor lighting luminaires and incandescent lamps CFLs are replaced with light-emitting diode (LED) A-lamps. Energy savings of 14.3 kWh per year was applied based on the sum of the LED lighting and Exterior Lighting Controls with Photosensor kWh energy savings.

For the measures including a LED, a cost of $3.49 for LED dimmable A19 lamp 60 W equivalent is used. A cost of $1.74 is used for an equivalent CFL product which was used to estimate total replacement costs at years 10 and 25. Costs are based on a single LED lamp replacement. For the photosensor, an incremental cost of $12.62, based on a screw-in photosensor control, was obtained from an on-line product search of available products. A five-year lifetime for this type of control was assumed. 126
2025 Energy Code: Existing Single Family Building Upgrades 11 2025/08/15
Table 8. [All Vintages] LED Lamp vs. CFL
Climate
Zone
Electric/ Gas
Utility
Measure
Cost
Electricity
Savings
First Year
Utility
Cost
Savings
Customer On-Bill
Modest Gas Escalation
Customer On-Bill
High Gas Escalation
B/C Ratio NPV B/C Ratio NPV
CZ01 PGE $1.75 2.2 $0.77 10.05 $15.82 10.58 $16.74
CZ02 PGE $1.75 2.2 $0.86 11.26 $17.94 11.85 $18.98
CZ03 PGE $1.75 2.2 $0.78 10.14 $15.99 10.68 $16.92
CZ04 PGE $1.75 2.2 $0.80 10.39 $16.42 10.94 $17.38
CZ04 CPAU $1.75 2.2 $0.41 5.32 $7.56 5.60 $8.05
CZ05 PGE $1.75 2.2 $0.78 10.14 $15.99 10.67 $16.92
CZ05 PGE/SCG $1.75 2.2 $0.78 10.14 $15.99 10.67 $16.92
CZ06 SCE/SCG $1.75 2.2 $0.66 8.44 $13.01 8.99 $13.97
CZ07 SDGE $1.75 2.2 $0.95 13.15 $21.24 13.03 $21.04
CZ08 SCE/SCG $1.75 2.2 $0.74 9.51 $14.89 10.14 $15.98
CZ09 SCE/SCG $1.75 2.2 $0.71 9.17 $14.29 9.77 $15.33
CZ10 SCE/SCG $1.75 2.2 $0.73 9.38 $14.65 9.99 $15.72
CZ10 SDGE $1.75 2.2 $1.07 14.86 $24.24 14.74 $24.02
CZ11 PGE $1.75 2.2 $0.85 11.05 $17.57 11.63 $18.59
CZ12 PGE $1.75 2.2 $0.79 10.32 $16.29 10.86 $17.24
CZ12 SMUD/PGE $1.75 2.2 $0.47 6.08 $8.88 6.40 $9.44
CZ13 PGE $1.75 2.2 $0.86 11.27 $17.96 11.86 $19.00
CZ14 SCE/SCG $1.75 2.2 $0.74 9.58 $15.00 10.21 $16.10
CZ14 SDGE $1.75 2.2 $1.06 14.68 $23.93 14.56 $23.71
CZ15 SCE/SCG $1.75 2.2 $0.78 10.01 $15.75 10.66 $16.90
CZ16 PGE $1.75 2.2 $0.77 9.98 $15.71 10.51 $16.62
127
2025 Energy Code: Existing Single Family Building Upgrades 12 2025/08/15
Table 9. [All Vintages] Exterior Photosensor
Climate
Zone
Electric/ Gas
Utility
Measure
Cost
Electricity
Savings
First Year
Utility
Cost
Savings
Customer On-Bill
Modest Gas Escalation
Customer On-Bill
High Gas Escalation
B/C Ratio NPV B/C
Ratio NPV
CZ01 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ02 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ03 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ04 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ04 CPAU $54.03 12.1 $2.12 0.89 ($5.69) 0.94 ($3.15)
CZ05 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ05 PGE/SCG $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ06 SCE/SCG $54.03 12.1 $3.48 1.45 $24.36 1.55 $29.48
CZ07 SDGE $54.03 12.1 $5.07 2.27 $68.58 2.25 $67.53
CZ08 SCE/SCG $54.03 12.1 $3.48 1.45 $24.36 1.55 $29.48
CZ09 SCE/SCG $54.03 12.1 $3.48 1.45 $24.36 1.55 $29.48
CZ10 SCE/SCG $54.03 12.1 $3.48 1.45 $24.36 1.55 $29.48
CZ10 SDGE $54.03 12.1 $5.07 2.27 $68.58 2.25 $67.53
CZ11 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ12 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ12 SMUD/PGE $54.03 12.1 $1.46 0.62 ($20.73) 0.65 ($18.98) CZ13 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
CZ14 SCE/SCG $54.03 12.1 $3.48 1.45 $24.36 1.55 $29.48
CZ14 SDGE $54.03 12.1 $5.07 2.27 $68.58 2.25 $67.53
CZ15 SCE/SCG $54.03 12.1 $3.48 1.45 $24.36 1.55 $29.48
CZ16 PGE $54.03 12.1 $4.16 1.75 $40.75 1.85 $45.74
128
2025 Energy Code: Existing Single Family Building Upgrades 13 2025/08/15
Table 10. [All Vintages] LED and Photosensor
Climate
Zone
Electric/ Gas
Utility
Measure
Cost
Electricity
Savings
First Year
Utility Cost
Savings
Customer On-Bill
Modest Gas Escalation
Customer On-Bill High
Gas Escalation
B/C Ratio NPV B/C Ratio NPV
CZ01 PGE $55.77 14.3 $4.93 2.01 $56.57 2.12 $62.48
CZ02 PGE $55.77 14.3 $5.02 2.05 $58.70 2.16 $64.72
CZ03 PGE $55.77 14.3 $4.94 2.02 $56.74 2.12 $62.66
CZ04 PGE $55.77 14.3 $4.95 2.03 $57.17 2.13 $63.12
CZ04 CPAU $55.77 14.3 $2.53 1.03 $1.87 1.09 $4.90
CZ05 PGE $55.77 14.3 $4.94 2.02 $56.74 2.12 $62.66
CZ05 PGE/SCG $55.77 14.3 $4.94 2.02 $56.74 2.12 $62.66
CZ06 SCE/SCG $55.77 14.3 $4.13 1.67 $37.37 1.78 $43.45
CZ07 SDGE $55.77 14.3 $6.02 2.61 $89.82 2.59 $88.57
CZ08 SCE/SCG $55.77 14.3 $4.22 1.70 $39.25 1.82 $45.46
CZ09 SCE/SCG $55.77 14.3 $4.19 1.69 $38.65 1.80 $44.82
CZ10 SCE/SCG $55.77 14.3 $4.21 1.70 $39.01 1.81 $45.20
CZ10 SDGE $55.77 14.3 $6.14 2.66 $92.82 2.64 $91.55
CZ11 PGE $55.77 14.3 $5.00 2.05 $58.33 2.15 $64.33
CZ12 PGE $55.77 14.3 $4.95 2.02 $57.05 2.13 $62.98
CZ12 SMUD/PGE $55.77 14.3 $1.93 0.79 ($11.85) 0.83 ($9.54) CZ13 PGE $55.77 14.3 $5.02 2.05 $58.71 2.16 $64.73
CZ14 SCE/SCG $55.77 14.3 $4.22 1.71 $39.37 1.82 $45.58
CZ14 SDGE $55.77 14.3 $6.13 2.66 $92.51 2.64 $91.24
CZ15 SCE/SCG $55.77 14.3 $4.26 1.72 $40.12 1.83 $46.38
CZ16 PGE $55.77 14.3 $4.92 2.01 $56.46 2.12 $62.36
129
2025 Energy Code: Existing Single Family Building Upgrades 14 2025/08/15
4 Water Heating Package
This package includes the following:
• R-6 water heater blanket
• R-3 hot water pipe insulation
• Low flow fixtures: two low flow showerheads and three sink aerators.

This analysis assumes the homeowner installs these measures themselves and therefore no labor costs. Costs are based on Home Depot prices from August of 2025. The water heater package is evaluated over a 15-year analysis period and assumes the modest gas escalation rate.

Table 11. [All Vintages] Water Heating Package
Climate
Zone
Electric/ Gas
Utility
Measure
Cost
Gas
Savings
(therms)
Customer On-Bill
First Year Utility
Cost Savings B/C Ratio NPV
CZ01 PGE $125.68 14.69 $31.11 3.96 $371.76
CZ02 PGE $125.68 15.60 $35.20 4.48 $437.15
CZ03 PGE $125.68 15.70 $31.43 4.00 $376.88
CZ04 PGE $125.68 16.05 $32.62 4.15 $395.78
CZ04 CPAU $125.68 16.05 $31.99 4.07 $385.77
CZ05 PGE $125.68 15.83 $31.37 3.99 $375.88
CZ05 PGE/SCG $125.68 15.83 $28.29 3.60 $326.59
CZ06 SCE/SCG $125.68 16.67 $29.18 3.71 $340.84
CZ07 SDGE $125.68 16.75 $37.25 4.74 $469.81
CZ08 SCE/SCG $125.68 16.78 $29.36 3.74 $343.80
CZ09 SCE/SCG $125.68 16.66 $29.27 3.72 $342.34
CZ10 SCE/SCG $125.68 16.58 $28.99 3.69 $337.73
CZ10 SDGE $125.68 16.58 $37.77 4.80 $478.19
CZ11 PGE $125.68 15.87 $32.96 4.19 $401.32
CZ12 PGE $125.68 15.90 $32.85 4.18 $399.47
CZ12 SMUD/PGE $125.68 15.90 $32.85 4.18 $399.47
CZ13 PGE $125.68 16.32 $33.00 4.20 $401.93
CZ14 SCE/SCG $125.68 16.11 $29.79 3.79 $350.57
CZ14 SDGE $125.68 16.11 $39.23 4.99 $501.49
CZ15 SCE/SCG $125.68 17.40 $30.16 3.84 $356.50
CZ16 PGE $125.68 15.14 $31.75 4.04 $381.87
130
2025 Energy Code: Existing Single Family Building Upgrades 15 2025/08/15
5 PV
The results for 3 kW PV have been updated from the 2022 study to remove the federal solar tax credit from the cost-effectiveness calculations. The removal of the solar tax credit has a substantial impact on many climate zones across all vintages and will impact the FlexPath.

The following describes the impacts and changes to cost-effectiveness from the 2022 study.

These observations are utilizing standard rates. Previously, with the solar tax credit, the 3 kW PV measure in the pre-1978 vintage was on-bill cost effective in all climate zones using both the modest and high gas escalation rates. However, with the credit removed, Climate Zones 1-3, 5, 6, and 12 are no longer cost effective on-bill for both the modest and high gas escalations.

Previously for the 1978-1991 vintage the only cases that were not on-bill cost effective were climate zones 2 and 6 utilizing the modest gas escalation. Now, with the credit removed, many more climate zones are no longer cost effective. Using the modest gas escalation, climate zones 1-3, 5, 6, 12, and 16 are not cost effective on-bill. Using the high gas escalation, climate zones 1-3, 5, 6, and 12 (SMUD) are not cost effective on-bill.

Previously for the 1992-2010 vintage the following cases were not cost effective on-bill:
climate zones 1-3, 5, and 6 utilizing the modest gas escalation and climate zone 6 using the high gas escalation. With the credit removed an increased number of climate zones are no longer cost effective. Using the modest gas escalation, climate zones 1-3, 4 (PGE) 5-9, 10 (SCE/SCG),12, and 16 are not cost effective on-bill. Using the high gas escalation, climate zones 1-3, 4 (PGE), 5-7, 9, 12, and 16 are not cost effective on-bill.

The cost-effectiveness results are presented in Table 12 through Table 1717. 131
2025 Energy Code: Existing Single Family Building Upgrades 16 2025/08/15
Table 12. [Pre-1978] 3 kW PV without Solar Tax Credit (Std) Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
On-Bill Savings
On-Bill B/C
Modest Gas
Escalation
On-Bill NPV
Modest Gas
Escalation
On-Bill B/C
High Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $13,726 0.80 ($3,074) 0.85 ($2,410)
CZ02 PGE $13,726 0.80 ($3,072) 0.85 ($2,409)
CZ03 PGE $13,726 0.77 ($3,567) 0.81 ($2,930)
CZ04 PGE $13,726 1.11 $1,652 1.16 $2,564
CZ04 CPAU $13,726 1.38 $5,983 1.45 $7,123
CZ05 PGE $13,726 0.78 ($3,431) 0.82 ($2,786)
CZ05 PGE/SCG $13,726 0.78 ($3,431) 0.82 ($2,786)
CZ06 SCE/SCG $13,726 0.87 ($2,118) 0.92 ($1,231)
CZ07 SDGE $13,726 1.31 $4,886 1.30 $4,711
CZ08 SCE/SCG $13,726 1.30 $4,655 1.38 $5,984
CZ09 SCE/SCG $13,726 1.18 $2,821 1.26 $4,030
CZ10 SCE/SCG $13,726 1.29 $4,622 1.38 $5,948
CZ10 SDGE $13,726 1.99 $15,550 1.97 $15,284
CZ11 PGE $13,726 1.55 $8,684 1.64 $9,967
CZ12 PGE $13,726 1.07 $1,117 1.13 $2,002
CZ12 SMUD/PGE $13,726 0.93 ($1,109) 0.98 ($342)
CZ13 PGE $13,726 1.80 $12,597 1.90 $14,085
CZ14 SCE/SCG $13,726 1.58 $9,098 1.68 $10,717
CZ14 SDGE $13,726 2.15 $17,983 2.13 $17,695
CZ15 SCE/SCG $13,726 2.24 $19,477 2.39 $21,774
CZ16 PGE $13,726 1.04 $579 1.09 $1,435
132
2025 Energy Code: Existing Single Family Building Upgrades 17 2025/08/15
Table 13. [1978-1991] 3 kW PV without Solar Tax Credit (Std) Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
On-Bill Savings
On-Bill B/C
Modest Gas
Escalation
On-Bill NPV
Modest Gas
Escalation
On-Bill B/C
High Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $13,726 0.77 ($3,570) 0.81 ($2,932)
CZ02 PGE $13,726 0.71 ($4,549) 0.75 ($3,963)
CZ03 PGE $13,726 0.74 ($4,106) 0.78 ($3,497)
CZ04 PGE $13,726 1.00 $7 1.05 $833
CZ04 CPAU $13,726 1.35 $5,517 1.42 $6,633
CZ05 PGE $13,726 0.75 ($3,985) 0.79 ($3,369)
CZ05 PGE/SCG $13,726 0.75 ($3,985) 0.79 ($3,369)
CZ06 SCE/SCG $13,726 0.73 ($4,249) 0.78 ($3,501)
CZ07 SDGE $13,726 1.17 $2,623 1.16 $2,466
CZ08 SCE/SCG $13,726 1.20 $3,086 1.27 $4,313
CZ09 SCE/SCG $13,726 1.09 $1,487 1.17 $2,609
CZ10 SCE/SCG $13,726 1.18 $2,884 1.26 $4,097
CZ10 SDGE $13,726 1.85 $13,356 1.84 $13,108
CZ11 PGE $13,726 1.41 $6,420 1.48 $7,583
CZ12 PGE $13,726 0.97 ($512) 1.02 $287
CZ12 SMUD/PGE $13,726 0.93 ($1,109) 0.98 ($342)
CZ13 PGE $13,726 1.63 $9,953 1.72 $11,302
CZ14 SCE/SCG $13,726 1.42 $6,655 1.52 $8,115
CZ14 SDGE $13,726 2.00 $15,653 1.98 $15,386
CZ15 SCE/SCG $13,726 1.94 $14,686 2.06 $16,670
CZ16 PGE $13,726 0.95 ($737) 1.00 $49
133
2025 Energy Code: Existing Single Family Building Upgrades 18 2025/08/15
Table 1414. [1992-2010] 3 kW PV without Solar Tax Credit (Std) Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
On-Bill Savings
On-Bill B/C
Modest Gas
Escalation
On-Bill NPV
Modest Gas
Escalation
On-Bill B/C
High Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $13,726 0.71 ($4,475) 0.75 ($3,885)
CZ02 PGE $13,726 0.73 ($4,198) 0.77 ($3,593)
CZ03 PGE $13,726 0.72 ($4,411) 0.76 ($3,817)
CZ04 PGE $13,726 0.80 ($3,121) 0.84 ($2,459)
CZ04 CPAU $13,726 1.16 $2,477 1.22 $3,433
CZ05 PGE $13,726 0.73 ($4,299) 0.76 ($3,700)
CZ05 PGE/SCG $13,726 0.73 ($4,299) 0.76 ($3,700)
CZ06 SCE/SCG $13,726 0.61 ($6,143) 0.65 ($5,520)
CZ07 SDGE $13,726 0.94 ($931) 0.93 ($1,057)
CZ08 SCE/SCG $13,726 0.98 ($242) 1.05 $767
CZ09 SCE/SCG $13,726 0.88 ($1,890) 0.94 ($988)
CZ10 SCE/SCG $13,726 0.96 ($676) 1.02 $305
CZ10 SDGE $13,726 1.51 $8,054 1.50 $7,852
CZ11 PGE $13,726 1.10 $1,569 1.16 $2,477
CZ12 PGE $13,726 0.80 ($3,169) 0.84 ($2,510)
CZ12 SMUD/PGE $13,726 0.93 ($1,109) 0.98 ($342)
CZ13 PGE $13,726 1.27 $4,170 1.33 $5,215
CZ14 SCE/SCG $13,726 1.15 $2,295 1.22 $3,470
CZ14 SDGE $13,726 1.66 $10,386 1.65 $10,164
CZ15 SCE/SCG $13,726 1.37 $5,788 1.46 $7,191
CZ16 PGE $13,726 0.81 ($3,006) 0.85 ($2,338)
134
2025 Energy Code: Existing Single Family Building Upgrades 19 2025/08/15
Table 1515. [Pre-1978] 3 kW PV without Solar Tax Credit (CARE) Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
On-Bill Savings
On-Bill B/C
Modest Gas
Escalation
On-Bill NPV
Modest Gas
Escalation
On-Bill B/C
High Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $13,726 0.62 ($6,030) 0.65 ($5,522)
CZ02 PGE $13,726 0.64 ($5,707) 0.67 ($5,182)
CZ03 PGE $13,726 0.60 ($6,344) 0.63 ($5,853)
CZ04 PGE $13,726 0.83 ($2,725) 0.87 ($2,042)
CZ05 PGE $13,726 0.60 ($6,266) 0.63 ($5,771)
CZ05 PGE/SCG $13,726 0.60 ($6,266) 0.63 ($5,771)
CZ06 SCE/SCG $13,726 0.71 ($4,578) 0.75 ($3,852)
CZ07 SDGE $13,726 0.71 ($4,508) 0.71 ($4,604)
CZ08 SCE/SCG $13,726 0.97 ($483) 1.03 $510
CZ09 SCE/SCG $13,726 0.90 ($1,530) 0.96 ($605)
CZ10 SCE/SCG $13,726 0.97 ($465) 1.03 $530
CZ10 SDGE $13,726 1.19 $3,032 1.18 $2,872
CZ11 PGE $13,726 1.07 $1,150 1.13 $2,036
CZ12 PGE $13,726 0.79 ($3,324) 0.83 ($2,673)
CZ13 PGE $13,726 1.23 $3,587 1.29 $4,601
CZ14 SCE/SCG $13,726 1.17 $2,662 1.25 $3,861
CZ14 SDGE $13,726 1.28 $4,436 1.27 $4,264
CZ15 SCE/SCG $13,726 1.57 $8,962 1.67 $10,572
CZ16 PGE $13,726 0.79 ($3,342) 0.83 ($2,692)
135
2025 Energy Code: Existing Single Family Building Upgrades 20 2025/08/15
Table 1616. [1978-1991] 3 kW PV without Solar Tax Credit (CARE) Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
On-Bill Savings
On-Bill B/C
Modest Gas
Escalation
On-Bill NPV
Modest Gas
Escalation
On-Bill B/C
High Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $13,726 0.60 ($6,343) 0.63 ($5,851)
CZ02 PGE $13,726 0.56 ($6,845) 0.59 ($6,380)
CZ03 PGE $13,726 0.57 ($6,757) 0.60 ($6,287)
CZ04 PGE $13,726 0.76 ($3,715) 0.80 ($3,085)
CZ05 PGE $13,726 0.57 ($6,686) 0.60 ($6,213)
CZ05 PGE/SCG $13,726 0.57 ($6,686) 0.60 ($6,213)
CZ06 SCE/SCG $13,726 0.61 ($6,195) 0.64 ($5,575)
CZ07 SDGE $13,726 0.62 ($6,004) 0.61 ($6,087)
CZ08 SCE/SCG $13,726 0.91 ($1,483) 0.96 ($555)
CZ09 SCE/SCG $13,726 0.85 ($2,368) 0.90 ($1,497)
CZ10 SCE/SCG $13,726 0.90 ($1,597) 0.96 ($676)
CZ10 SDGE $13,726 1.10 $1,560 1.09 $1,413
CZ11 PGE $13,726 0.98 ($295) 1.03 $515
CZ12 PGE $13,726 0.72 ($4,320) 0.76 ($3,722)
CZ13 PGE $13,726 1.12 $1,893 1.18 $2,818
CZ14 SCE/SCG $13,726 1.07 $1,051 1.14 $2,144
CZ14 SDGE $13,726 1.18 $2,878 1.17 $2,719
CZ15 SCE/SCG $13,726 1.37 $5,735 1.45 $7,135
CZ16 PGE $13,726 0.74 ($4,126) 0.78 ($3,517)
136
2025 Energy Code: Existing Single Family Building Upgrades 21 2025/08/15
Table 1717. [1992-2010] 3 kW PV without Solar Tax Credit (CARE) Climate
Zone
Electric/ Gas
Utility
First
Incremental
Cost
On-Bill Savings
On-Bill B/C
Modest Gas
Escalation
On-Bill NPV
Modest Gas
Escalation
On-Bill B/C
High Gas
Escalation
On-Bill NPV
High Gas
Escalation
CZ01 PGE $13,726 0.56 ($6,963) 0.59 ($6,504)
CZ02 PGE $13,726 0.26 ($11,640) 0.20 ($12,611)
CZ03 PGE $13,726 0.55 ($6,997) 0.58 ($6,540)
CZ04 PGE $13,726 0.62 ($5,900) 0.66 ($5,385)
CZ05 PGE $13,726 0.56 ($6,932) 0.59 ($6,471)
CZ05 PGE/SCG $13,726 0.56 ($6,932) 0.59 ($6,471)
CZ06 SCE/SCG $13,726 0.51 ($7,652) 0.55 ($7,127)
CZ07 SDGE $13,726 0.48 ($8,115) 0.48 ($8,180)
CZ08 SCE/SCG $13,726 0.78 ($3,430) 0.83 ($2,629)
CZ09 SCE/SCG $13,726 0.72 ($4,462) 0.76 ($3,728)
CZ10 SCE/SCG $13,726 0.76 ($3,748) 0.81 ($2,968)
CZ10 SDGE $13,726 0.86 ($2,225) 0.85 ($2,340)
CZ11 PGE $13,726 0.79 ($3,259) 0.83 ($2,605)
CZ12 PGE $13,726 0.63 ($5,876) 0.66 ($5,359)
CZ13 PGE $13,726 0.89 ($1,678) 0.94 ($941)
CZ14 SCE/SCG $13,726 0.89 ($1,676) 0.95 ($761)
CZ14 SDGE $13,726 0.95 ($838) 0.94 ($964)
CZ15 SCE/SCG $13,726 0.99 ($142) 1.06 $873
CZ16 PGE $13,726 0.63 ($5,850) 0.66 ($5,333)
137
2025 Energy Code: Existing Single Family Building Upgrades 22 2025/08/15
6 References
California Energy Commission. (2017). Rooftop Solar PV System. Measure number: 2019- Res-PV-D Prepared by Energy and Environmental Economics, Inc. Retrieved from https://efiling.energy.ca.gov/getdocument.aspx?tn=221366 California Energy Commission. (2021b). Final Express Terms for the Proposed Revisions to the 2022 Energy Code Reference Appendices. Retrieved from https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=21-BSTD-01 California Energy Commission. (2023). 2025 Energy code Hourly Factors. Retrieved from https://www.energy.ca.gov/files/2025-energy-code-hourly-factors California Energy Commission. (2023). Draft 2025 Energy Code Express Terms. Retrieved from
https://efiling.energy.ca.gov/GetDocument.aspx?tn=252915&DocumentContentId=88 051
California Public Utilities Commission. (2021a). Utility Costs and Affordability of the Grid of the Future: An Evaluation of Electric Costs, Rates, and Equity Issues Pursuant to P.U. Code Section 913.1. Retrieved from https://www.cpuc.ca.gov/-/media/cpucwebsite/divisions/office-of-governmental-affairs-division/reports/2021/senate-bill-695- report-2021-and-en-banc-whitepaper_final_04302021.pdf
California Public Utilities Commission. (2021b). Database for Energy-Efficient resources (DEER2021 Update). Retrieved April 13, 2021, from
http://www.deeresources.com/index.php/deer-versions/deer2021 E-CFR. (2020). https://www.ecfr.gov/cgibin/retrieveECFR?gp=&SID=8de751f141aaa1c1c9833b36156faf67&mc=true&n=pt1

0.3.431&r=PART&ty=HTML#se10.3.431_197. Retrieved from Electronic Code of Federal Regulations: https://www.ecfr.gov/cgibin/retrieveECFR?gp=&SID=8de751f141aaa1c1c9833b36156faf67&mc=true&n=pt1

0.3.431&r=PART&ty=HTML#se10.3.431_197
Statewide CASE Team. (2020). Residential Energy Savings and Process Improvements for Additions and Alterations.

Statewide CASE Team. (2023). Multifamily Domestic Hot Water. Retrieved from https://title24stakeholders.com/wp-content/uploads/2023/08/2025_T24_CASEReport-_MF-DHW-Final-1.pdf Statewide CASE Team. (2023). Residential HVAC PErformance. Retrieved from https://title24stakeholders.com/wpcontent/uploads/2023/11/Revised_2025_T24_Final-CASE-Report-RES-HVACPerformance.pdf 138
2025 Energy Code: Existing Single Family Building Upgrades 23 2025/08/15
Statewide Reach Codes Team. (2021). 2019 Cost-Effectiveness Study: Existing Single Family Residential Buidling Upgrades. Retrieved from
https://localenergycodes.com/content/resources
139
2025 Energy Code: Existing Single Family Building Upgrades 24 2025/08/15
Get In Touch
The adoption of reach codes can differentiate
jurisdictions as efficiency leaders and help accelerate the adoption of new equipment, technologies, code
compliance, and energy savings strategies.

As part of the Statewide Codes & Standards
Program, the Reach Codes Subprogram is a
resource available to any local jurisdiction located
throughout the state of California.

Our experts develop robust toolkits as well as provide
specific technical assistance to local jurisdictions
(cities and counties) considering adopting energy
reach codes. These include cost-effectiveness
research and analysis, model ordinance language
and other code development and implementation
tools, and specific technical assistance throughout
the code adoption process.

If you are interested in finding out more about local
energy reach codes, the Reach Codes Team stands
ready to assist jurisdictions at any stage of a reach
code project.

Visit
LocalEnergyCodes.com to
access our resources and
sign up for newsletters
Contact
[email protected]
for no-charge assistance from
expert Reach Code advisors
Explore
The Cost-Effectiveness
Explorer is a free resource to
help California local
governments and
stakeholders develop energy
policies for buildings.

Follow
us on Linkedin
Revision: 1.0
Last modified: 2025/08/15
140

Prepared by:

Ada Shen, Alea German, Rebecca Evans, & Marc Hoeschele, Frontier Energy, Inc Misti Bruceri, Misti Bruceri & Associates, LLC
Prepared for:

Kelly Cunningham, Codes and Standards Program, Pacific Gas and Electric Last modified: 2024/04/25
Revision: 1.0
141
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
2 Legal Notice
This report was prepared by Pacific Gas and Electric Company and funded by the California utility customers under the auspices of the California Public Utilities Commission.

Copyright 2024, Pacific Gas and Electric Company. All rights reserved, except that this document may be used, copied, and distributed without modification.

Neither PG&E nor any of its employees makes any warranty, express or implied; or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any data, information, method, product, policy or process disclosed in this document; or represents that its use will not infringe any privately-owned rights including, but not limited to, patents, trademarks or copyrights.

Acronym List
2023 PV$ – Present value costs in 2023
ACH50 – Air Changes per Hour at 50 pascals pressure differential ACM – Alternative Calculation Method
ADU – Accessory Dwelling Unit
AFUE – Annual Fuel Utilization Efficiency
B/C – Lifecycle Benefit-to-Cost Ratio
BEopt – Building Energy Optimization Tool
BSC – Building Standards Commission
CA IOUs – California Investor-Owned Utilities
CASE – Codes and Standards Enhancement
CBECC-Res – Computer program developed by the California Energy Commission for use in demonstrating compliance with the California Residential Building Energy Efficiency Standards CEER – Combined Energy Efficiency Rating
CFI – California Flexible Installation
CFM – Cubic Feet per Minute
CO2 – Carbon Dioxide
CPAU – City of Palo Alto Utilities
CPUC – California Public Utilities Commission
CZ – California Climate Zone
DFHP – Dual Fuel Heat Pump
DHW – Domestic Hot Water
DOE – Department of Energy
DWHR – Drain Water Heat Recovery
EDR – Energy Design Rating
EER – Energy Efficiency Ratio
EF – Energy Factor
142
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
3 GHG – Greenhouse Gas
HERS Rater – Home Energy Rating System Rater
HPA – High Performance Attic
HPSH – Heat Pump Space Heater
HPWH – Heat Pump Water Heater
HSPF – Heating Seasonal Performance Factor
HVAC – Heating, Ventilation, and Air Conditioning
IECC – International Energy Conservation Code
IOU – Investor Owned Utility
kBtu –British thermal unit (x1000)
kWh – Kilowatt Hour
LBNL – Lawrence Berkeley National Laboratory
LCC – Life Cycle Cost
LLAHU – Low Leakage Air Handler Unit
VLLDCS – Verified Low Leakage Ducts in Conditioned Space LSC – Long-term Systemwide Cost
MF – Multifamily
MSHP – Mini-Split Heat Pump
NEEA – Northwest Energy Efficiency Alliance
NEM – Net Energy Metering
NPV – Net Present Value
NREL – National Renewable Energy Laboratory
PG&E – Pacific Gas and Electric Company
POU – Publicly-Owned-Utilities
PV – Photovoltaic
SCE – Southern California Edison
SDG&E – San Diego Gas and Electric
SEER – Seasonal Energy Efficiency Ratio
SF – Single Family
SMUD – Sacramento Municipal Utility District
SoCalGas – Southern California Gas Company
TDV – Time Dependent Valuation
Therm – Unit for quantity of heat that equals 100,000 British thermal units Title 24 – Title 24, Part 6
TOU – Time-Of-Use
UEF – Uniform Energy Factor
VCHP – Variable Capacity Heat Pump, Title 24 compliance credit ZNE – Zero-net Energy
143
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
4 Summary of Revisions
Date Description Reference (page or section)
4/25/2024 Original Release N/A
144
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
5 TABLE OF CONTENTS
Executive Summary..........................................................................................................................................................1 1 Introduction................................................................................................................................................................6 2 Methodology and Assumptions...............................................................................................................................7

2.1 Analysis for Reach Codes..................................................................................................................................................... 7

2.1.1 Modeling ....................................................................................................................................................................... 7

2.1.2 Prototype Characteristics.............................................................................................................................................. 7

2.1.3 Cost-Effectiveness Approach...................................................................................................................................... 10

2.1.4 Utility Rates................................................................................................................................................................. 11

2.1.5 Measure Cost Data Collection Approach .................................................................................................................... 12

2.2 Measure Details and Cost................................................................................................................................................... 12

2.2.1 Building Envelope & Duct Measures........................................................................................................................... 13

2.2.2 PV Measures .............................................................................................................................................................. 14

2.2.3 Equipment Fuel Substitution Measures – Heat Pump Equipment............................................................................... 15 3 Results......................................................................................................................................................................21

3.1 Cost-Effectiveness Results ................................................................................................................................................. 22

3.1.1 HPSH Measures ......................................................................................................................................................... 22

3.1.2 HPWH Measures ........................................................................................................................................................ 24

3.2 Climate Zone Case Studies ................................................................................................................................................ 26

3.2.1 HPSH Cost-Effectiveness ........................................................................................................................................... 26

3.2.2 HPWH Cost-Effectiveness .......................................................................................................................................... 27

3.2.3 Envelope & Duct Improvement Cost-Effectiveness..................................................................................................... 28

3.2.4 Sensitivities................................................................................................................................................................. 29

3.3 Gas Pathways for Heat Pump Replacements..................................................................................................................... 30 4 Recommendations and Discussion.......................................................................................................................32 5 References ...............................................................................................................................................................36 6 Appendices ..............................................................................................................................................................37

6.1 Map of California Climate Zones......................................................................................................................................... 37

6.2 Utility Rate Schedules......................................................................................................................................................... 38

6.2.1 Pacific Gas & Electric.................................................................................................................................................. 39

6.2.2 Southern California Edison ......................................................................................................................................... 47

6.2.3 Southern California Gas.............................................................................................................................................. 51

6.2.4 San Diego Gas & Electric............................................................................................................................................ 53

6.2.5 City of Palo Alto Utilities.............................................................................................................................................. 63

6.2.6 Sacramento Municipal Utilities District (Electric Only)................................................................................................. 65

6.2.7 Fuel Escalation Assumptions...................................................................................................................................... 67 145
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
6 LIST OF TABLES
Table 1. Prototype Characteristics........................................................................................................................................................ 8 Table 2. Efficiency Characteristics for Three Vintage Cases ................................................................................................................ 9 Table 3. Measure Cost Assumptions – Efficiency & Duct Measures .................................................................................................. 14 Table 4. Measure Descriptions & Cost Assumptions – PV ................................................................................................................. 15 Table 5. Lifetime Analysis Replacement Assumptions for DFHP (Existing Furnace) Scenario .......................................................... 16 Table 6. System Sizing by Climate Zone ............................................................................................................................................ 17 Table 7. Ducted HVAC Measure Cost Assumptions – 4-Ton Electric Replacements ......................................................................... 18 Table 8. Non-Ducted HVAC Measure Cost Assumptions – 4-Ton Electric Replacements ................................................................. 18 Table 9. Water Heating Measure Cost Assumptions – Existing Gas .................................................................................................. 19 Table 10. Water Heating Measure Cost Assumptions – Existing Electric Resistance ........................................................................ 20 Table 11. HPSH CZ 12 [1992-2010]................................................................................................................................................... 26 Table 12. HPSH CZ 16 [1992-2010]................................................................................................................................................... 26 Table 13. HPWH CZ 12 [1992-2010].................................................................................................................................................. 27 Table 14. HPWH CZ 16 [1992-2010].................................................................................................................................................. 27 Table 15. Envelope and Duct Measures CZ 3 [Pre-1978] .................................................................................................................. 28 Table 16. Envelope and Duct Measures CZ 10 [Pre-1978]................................................................................................................. 28 Table 17. Envelope and Duct Measures CZ 12 [Pre-1978]................................................................................................................. 28 Table 18. Sensitivity Analysis Results for On-Bill NPV Cost-Effectiveness in Climate Zone 12, PG&E.............................................. 29 Table 19. Electric Panel Upgrade Sensitivity for CZ 12 [1992-2010] .................................................................................................. 29 Table 20. PG&E Baseline Territory by Climate Zone.......................................................................................................................... 39 Table 21. PG&E Monthly Gas Rate ($/therm)..................................................................................................................................... 39 Table 22: SCE Baseline Territory by Climate Zone ............................................................................................................................ 47 Table 23. SoCalGas Baseline Territory by Climate Zone ................................................................................................................... 51 Table 24. SoCalGas Monthly Gas Rate ($/therm) .............................................................................................................................. 51 Table 25. SDG&E Baseline Territory by Climate Zone ....................................................................................................................... 53 Table 26. SDG&E Monthly Gas Rate ($/therm).................................................................................................................................. 53 Table 27. CPAU Monthly Gas Rate ($/therm)..................................................................................................................................... 63 Table 28: Real Utility Rate Escalation Rate Assumptions, CPUC En Banc and 2022 TDV Basis ...................................................... 67 Table 29: Real Utility Rate Escalation Rate Assumptions, 2025 LSC Basis ....................................................................................... 68 146
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
7 LIST OF FIGURES
Figure 1: DFHP with Existing Furnace............................................................................................................................................ 22 Figure 2: Standard Efficiency HPSH............................................................................................................................................... 22 Figure 3: High Efficiency HPSH...................................................................................................................................................... 23 Figure 4: Ducted MSHP.................................................................................................................................................................. 23 Figure 5: HPSH + PV...................................................................................................................................................................... 23 Figure 6: 240V Federal Minimum HPWH........................................................................................................................................ 24 Figure 7: 240V Market Standard NEEA HPWH .............................................................................................................................. 24 Figure 8: 120V Market Standard NEEA HPWH .............................................................................................................................. 24 Figure 9: 240V Federal Minimum HPWH + PV............................................................................................................................... 24 Figure 10: R-6 Ducts....................................................................................................................................................................... 25 Figure 11: 10% Duct Leakage ........................................................................................................................................................ 25 Figure 12: R-13 Wall Insulation....................................................................................................................................................... 25 Figure 13: R-49 Attic Insulation....................................................................................................................................................... 25 Figure 14. Heat pump space heater path compared to the air conditioner path. ............................................................................ 31 Figure 15. Heat pump water path compared to gas with solar thermal........................................................................................... 31 Figure 16. Map of California climate zones..................................................................................................................................... 37 147
148
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
1 California Energy Codes & Standards | A statewide utility program 2024-04-25 Executive Summary
The California Codes and Standards (C&S) Reach Codes program provides technical support to local governments considering adopting a local ordinance (reach code) intended to support meeting local and/or statewide energy efficiency and greenhouse gas (GHG) reduction goals. The program facilitates adoption and implementation of the code when requested by local jurisdictions by providing resources such as cost-effectiveness studies, model language, sample findings, and other supporting documentation.

This report documents cost-effective measure upgrades in existing single family buildings that exceed the minimum state requirements. It evaluates efficiency measures such as adding insulation, replacing windows, and duct upgrades, fuel substitution measures that upgrade space heating and water heating to heat pumps, and solar photovoltaics (PV) across all 16 California climate zones. A 1,665 square foot single family home prototype with an attached garage was evaluated in this study.

This analysis used two different metrics to assess the cost-effectiveness of the proposed upgrades. Both methodologies require estimating and quantifying the incremental costs and energy savings associated with each energy efficiency measure over a 30-year analysis period. On-Bill cost-effectiveness is a customer-based lifecycle cost (LCC) approach that values energy based upon estimated site energy usage and customer utility bill savings using today’s electricity and natural gas utility tariffs. Long-term Systemwide Cost (LSC) is the California Energy Commission’s LCC methodology for the 2025 Title 24, Part 6 (Title 24) code cycle (previously referred to as Time Dependent Valuation (TDV)), which is intended to capture the long-term projected cost of energy including costs for providing energy during peak periods of demand, carbon emissions, grid transmission and distribution impacts. This is the methodology used by the Energy Commission in evaluating cost-effectiveness for efficiency measures in Title 24 code development.

The following summarizes key results from the study:

Conclusions and Discussion:

1. Envelope measures. Improving envelope performance is very cost-effective in many older homes. In addition to reducing utility costs, these measures provide many other benefits such as improving occupant comfort and satisfaction and increasing a home’s ability to maintain temperatures during extreme weather events and power outages. Below is a discussion of the results of specific measures. a. Adding attic insulation is cost-effective based on both LSC and On-Bill in many climate zones in homes with no more than R-19 existing attic insulation levels. Increasing attic insulation from R-30 to R-49 was still found to be cost-effective based on at least one metric in the colder and hotter climates of Climate Zone 10 (SDG&E territory only) through 16.
b. Insulating existing uninsulated walls is very cost-effective based on both metrics everywhere except Climate Zones 6 and 7 (in Climate Zone 8 it’s only cost-effective based on LSC). c. Adding R-19 or R-30 floor insulation is cost-effective based on LSC in the older two vintages (Pre-1978 and 1978-1991) in all CZ except CZ 6-10.
d. Replacing old single pane windows with new high-performance windows has a very high cost and is typically not done for energy savings alone. However, energy savings are substantial and justify costeffectiveness of this measure based on at least one metric in Climate Zones 4, 8 through 12 (PG&E territory only), and 13 through 16.
e. At time of roof replacement, a cool roof with an aged solar reflectance of 0.25 was found to be costeffective in Climate Zones 4, 6 through 12 (PG&E territory only), and 13 through 15. When the roof deck is replaced during a roof replacement, adding a radiant barrier is low cost and provides substantial cooling energy savings, and was found to be cost-effective in almost all climate zones and homes.

2. Duct measures: Many older homes have old, leaky duct systems that should be replaced when they reach the end of life, typically 20-30 years. In this case, installing new ducts was found to be cost-effective based on at least one metric (both in most cases) everywhere except mild Climate Zone 7 and Climate Zones 5 and 6 in 149
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
2 California Energy Codes & Standards | A statewide utility program 2024-04-25 the 1978-1991 vintage. If duct systems still have remaining life they should be sealed and tested to meet 10% leakage or lower; however, duct upgrades alone were only found to be cost-effective for newer homes in Climate Zones 10 (SDG&E territory only), 11, and 13 through 16. Duct upgrades may be able to be coupled with other measures to reduce the cost.

3. Heat pump space heating: HPSHs were found to be LSC cost-effective in many cases. The Dual Fuel Heat Pump (existing furnace) was LSC cost-effective everywhere except Climate Zone 15. The HPSH was LSC cost-effective everywhere except Climate Zones 8 and 15. a. Challenges to On-Bill cost-effectiveness include higher first costs and higher first-year utility costs due to higher electricity tariffs relative to gas tariffs. SMUD and CPAU are two exceptions where first year utility costs are lower for heat pumps than for gas equipment. Table 11 shows the impact of utility rates on cost-effectiveness of HPSH where the standard and high efficiency HPSH and the HPSH + PV measures are cost-effective under SMUD but not PG&E. Even with higher first year utility bills, there were some cases that still proved On-Bill cost-effective including the DFHP with an existing furnace in the central valley and northern coastal PG&E territories, the ducted MSHP in the central valley as well as Climate Zone 14 in SDG&E territory, and the HPSH + PV measure in CZ 3-5 (PGE), 7-11, and 12 (SMUD) – 15.
b. The ductless MSHPs were only found to be cost-effective based on either metric in Climate Zones 1 and 16. Ductless MSHPs have a high incremental cost because it is a more sophisticated system than the base model of a wall furnace with a window AC unit. However, the ductless MSHP would provide greater comfort benefits if properly installed to directly condition all habitable spaces (as is required under the VCHP compliance credit as evaluated in this study) which may be an incentive for a homeowner to upgrade their system.
c. Higher efficiency equipment lowered utility costs in all cases and improved cost-effectiveness in many cases, particularly with a ducted MSHP.

4. Heat pump water heating: All the HPWH measures were LSC cost-effective in all climate zones. Most measures were not On-Bill cost-effective with the exception of the HPWH + PV which was cost-effective OnBill in CPAU, SMUD, and SDG&E territories in addition to Climate Zones 11, 13, 14, and 15. The HPWH measures share many of the same challenges as the HPSH measures to achieving cost-effectiveness including high first costs and utility rates and assumptions. Table 13 shows the impact of utility rates on costeffectiveness where some HPWH measures are cost-effective under SMUD utility rates but are not costeffective anywhere under PG&E rates in Climate Zone 12. a. Various HPWH locations were also explored, however there are some factors outside of costeffectiveness that should also be considered. i. HPWHs in the conditioned space can provide benefits such as free-cooling during the summer, reduced tank losses, and shorter pipe lengths, and in some cases show improved cost-effectiveness over garage located HPWHs. However, there are various design considerations such as noise, comfort concerns, an additional heating load in the winter, and condensate removal. Ducting the inlet and exhaust air resolves comfort concerns but adds costs and complexity. Split heat pump water heaters address these concerns, but currently there are limited products on the market and there is a cost premium relative to the packaged products.
ii. Since HPWHs extract heat from the air and transfer it to water in the storage tank, they must have adequate ventilation to operate properly. Otherwise, the space cools down over time, impacting the HPWH operating efficiency. This is not a problem with garage installations but needs to be considered for water heaters located in interior or exterior closets. For the 2025 Title 24 code the CEC is proposing that all HPWH installations meet mandatory ventilation requirements (California Energy Commission, 2023).

5. The contractor surveys revealed overall higher heat pump costs than what has been found in previous analyses. This could be due to incentive availability raising demand for heat pumps and thereby increasing the price. This price increase may be temporary and may come down once the market stabilizes. There are also 150
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
3 California Energy Codes & Standards | A statewide utility program 2024-04-25 new initiatives to obtain current costs including the TECH Clean California program1 that publishes heat pump data and costs; however, at the time of this analysis, the TECH data did not contain incremental costs because it only had the heat pump costs but not the gas base case costs.

6. Table 18 shows how CARE rates and escalation rate assumptions will impact cost-effectiveness. a. Applying CARE rates in the IOU territories has the overall impact to increase utility cost savings for an all-electric building compared to a code compliant mixed fuel building, improving On-Bill costeffectiveness. This is due to the CARE discount on electricity being higher than that on gas. The reverse occurs with efficiency measures where lower utility rates reduce savings and subsequently reduce cost-effectiveness.
b. If gas tariffs are assumed to increase substantially over time, in-line with the escalation assumption from the 2025 LSC development, cost-effectiveness substantially improves for the heat pump measures over the 30-year analysis period and many cases become cost-effective that were not found to be cost-effective under the CPUC / 2022 TDV escalation scenario. There is much uncertainty surrounding future tariff structures as well as escalation values. While it’s clear that gas rates will increase, how much and how quickly is not known. Future electricity tariff structures are expected to evolve over time, and the CPUC has an active proceeding to adopt an income-graduated fixed charge that benefits low-income customers and supports electrification measures for all customers.2 The CPUC will make a decision in mid-2024 and the new rates are expected to be in place later that year or in 2025. While the anticipated impact of this rate change is lower volumetric electricity rates, the rate design is not finalized. While lower volumetric electricity rates provide many benefits, it also will make building efficiency measures harder to justify as cost-effective due to lower utility bill cost savings.

7. Under NBT, utility cost savings for PV are substantially less than what they were under prior net energy metering rules (NEM 2.0); however, savings are sufficient to be On-Bill cost-effective in all climate zones except Climate Zones 1 through 3, 5, and 6.
a. Combining a heat pump with PV allows the additional electricity required by the heat pump to be offset by the PV system while also increasing on-site utilization of PV generation rather than exporting the electricity back to the grid at a low rate.
b. While not evaluated in this study, coupling PV with battery systems can be very advantageous under NBT increasing utility cost savings because of improved on-site utilization of PV generation and fewer exports to the grid.

Recommendations:

1. There are various approaches for jurisdictions who are interested in reach codes for existing buildings. Some potential approaches are listed below along with key considerations. a. Prescriptive measures: Non-preempted measures that are found to be cost-effective may be prescriptively required in a reach code. One example of this type or ordinance is a cool roof requirement at time of roof replacement. Another example is requiring specific cost-effective measures for larger remodels, such as high-performance windows when new windows are installed or duct sealing and testing when ducts are in an unconditioned space. b. Replacement equipment: This flavor of reach code sets certain requirements at time of equipment replacement. This study evaluated space heating and water heating equipment. Where a heat pump measure was found to be cost-effective based on either LSC or On-Bill, this may serve as the basis of a reach code given the following considerations.
i. Where reach codes reduce energy usage and are not just fuel switching, cost-effectiveness calculations are required and must be based on equipment that does not exceed the federal minimum efficiency requirements.
ii. Where reach codes are established using cost-effectiveness based on LSC, utility bill impacts and the owner’s first cost should also be reviewed and considered. 1 TECH Public Reporting Home Page (techcleanca.com)
2 https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electric-costs/demand-response-dr/demand-flexibility-rulemaking 151
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
4 California Energy Codes & Standards | A statewide utility program 2024-04-25 iii. A gas path should also be prescriptively allowed to safely satisfy federal preemption requirements considering the CRA v. Berkeley case.3 Additional requirements may apply to the gas path, as described in Section 3.3, as long as the paths are reasonably energy or cost equivalent.
c. “Flexible Path”, minimum energy savings target: This flexible approach establishes a target for required energy savings based on a measure or a set of measures that were found to be cost-effective based on either LSC or On-Bill. A points menu compares various potential upgrades ranging from efficiency, PV, and fuel substitution measures, based on site or source energy savings. The applicant must select upgrades that individually or in combination meet the minimum energy savings target. The maximum target value shown in the Cost-effectiveness Explorer is based on a combination of costeffective, non-preempted measures.

2. Equipment replacement ordinances should consider appropriate exceptions for scenarios where it will be challenging to meet the requirements, such as location of the HPWH, total project cost limitations, or the need for service panel upgrades that wouldn’t have been required as part of the proposed scope of work in absence of the reach code.

3. Consider extending relevant proposals made by the CEC for the 2025 Title 24 code (California Energy Commission, 2023) in ordinances that apply under the 2022 Title 24 code, such as the following:
a. Mandatory ventilation requirements for HPWH installations (Section 110.3(c)7). The cost-effectiveness analysis can be found in the Multifamily Domestic Hot Water CASE report (Statewide Team, 2023). b. Requirement for HERS verified refrigerant charge verification for heat pumps in all climate zones (Table 150.1-A4). The cost-effectiveness analysis can be found in the Residential HVAC Performance CASE report (Statewide Team, 2023).

4. When evaluating reach code strategies, the Reach Codes Team recommends that jurisdictions consider combined benefits of energy efficiency alongside electrification. Efficiency and electrification have symbiotic benefits and are both critical for decarbonization of buildings. As demand on the electric grid is increased through electrification, efficiency can reduce the negative impacts of additional electricity demand on the grid, reducing the need for increased generation and storage capacity, as well as the need to upgrade upstream transmission and distribution equipment.

5. Education and training can play a critical role in ensuring that heat pumps are installed, commissioned, and controlled properly to mitigate grid impacts and maximize occupant satisfaction. Below are select recommended strategies.
a. The Quality Residential HVAC Services Program5 is an incentive program to train California contractors in providing quality installation and maintenance while advancing energy-efficient technologies in the residential HVAC industry. Jurisdictions can market this to local contractors to increase the penetration of contractors skilled in heat pump design and installation. b. Educate residents and contractors of available incentives, tax credits, and financing opportunities. c. Educate contractors on code requirements. Energy Code Ace provides free tools, training, and resources to help Californians comply with the energy code. Contractors can access interactive compliance forms, fact sheets, and live and recorded trainings, among other things, on the website:
https://energycodeace.com/. Jurisdictions can reach out to Energy Code Ace directly to discuss offerings.

6. Health and safety
a. Combustion Appliance Safety and Indoor Air Quality: Implementation of some of the recommended measures will affect the pressure balance of the home which can subsequently impact the safe operation of existing combustion appliances as well as indoor air quality. Buildings with older gas appliances can present serious health and safety problems which may not be addressed in a remodel 3 https://www.publichealthlawcenter.org/sites/default/files/2024-01/CRA-v-Berkeley-Ninth-Circuit-Opinion-Jan2024.pdf 4 This requirement does not show up in the Express Terms for alterations in Section 150.2(b)1F, but the Statewide Reach Codes Team expects that it will be added to the next release of the proposed code language in the 45-day language as it aligns with the proposal made by the Codes and Standards Enhancement Team (Statewide CASE Team, 2023). 5 https://qualityhvac.frontierenergy.com/ 152
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Executive Summary
5 California Energy Codes & Standards | A statewide utility program 2024-04-25 if the appliances are not being replaced. It is recommended that the building department require inspection and testing of all combustion appliances located within the pressure boundary of the building after completion of retrofit work that involves air sealing or insulation measures. b. Jurisdictions may consider requiring mechanical ventilation in homes where air sealing has been conducted. In older buildings, outdoor air is typically introduced through leaks in the building envelope.

After air sealing a building, it may be necessary to forcefully bring in fresh outdoor air using supply and/or exhaust fans to minimize potential issues associated with indoor air quality.

Local jurisdictions may also adopt ordinances that amend different Parts of the California Building Standards Code or may elect to amend other state or municipal codes. The decision regarding which code to amend will determine the specific requirements that must be followed for an ordinance to be legally enforceable. For example, reach codes that amend Part 6 of the CA Building Code and require energy performance beyond state code minimums must demonstrate the proposed changes are cost-effective and obtain approval from the Energy Commission as well as the Building Standards Commission (BSC). Amendments to Part 11, such as requirements for increased water efficiency or electric vehicle infrastructure only require BSC approval. Although a cost-effectiveness study is only required to amend Part 6 of the CA Building Code, this study provides valuable context for jurisdictions pursuing other ordinance paths to understand the economic impacts of any policy decision. This study documents the estimated costs, benefits, energy impacts and greenhouse gas emission reductions that may result from implementing an ordinance based on the results to help residents, local leadership, and other stakeholders make informed policy decisions.

This report documents the key results and conclusions from the Reach Codes Team analysis. A full dataset of all results can be downloaded at https://localenergycodes.com/content/resources. Results alongside policy options can also be explored using the Cost-effectiveness Explorer at https://explorer.localenergycodes.com/. Model ordinance language and other resources are posted on the C&S Reach Codes Program website at LocalEnergyCodes.com.

Local jurisdictions that are considering adopting an ordinance may contact the program for further technical support at [email protected].
153
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Introduction
6 California Energy Codes & Standards | A statewide utility program 2024-04-25 1 Introduction
This report documents cost-effective measure upgrades in existing single family buildings that exceed the minimum state requirements, the 2022 Building Energy Efficiency Standards, effective January 1, 2023. Local jurisdictions in California may consider adopting local energy ordinances to achieve energy savings beyond what will be accomplished by enforcing building efficiency requirements that apply statewide. This report was developed in coordination with the California Statewide Investor-Owned Utilities (IOUs) Codes and Standards Program, key consultants, and engaged cities—collectively known as the Statewide Reach Codes Team.

The focus of this study is on existing single family buildings and does not apply to low or high-rise multifamily buildings.

Each jurisdiction must establish the appropriate structure and threshold for triggering the proposed requirements.

Some common jurisdictional structures include triggering the requirements at major remodels, additions, or date-certain (upgrades must be completed by a specific date). Some of these measures could be triggered with a permit for another specific measure, such as a re-roofing project. The analysis includes scenarios of individual measures and identifies cost-effective options based on the existing conditions of the building in all 16 California Climate Zones (CZ) (see CostEffectiveness Results for a graphical depiction of climate zone locations).

This report documents the key results and conclusions from the Reach Codes Team analysis. A full dataset of all results can be downloaded at https://localenergycodes.com/content/resources. Results alongside policy options can also be explored using the Cost-effectiveness Explorer at https://explorer.localenergycodes.com/.

The California Codes and Standards (C&S) Reach Codes program provides technical support to local governments considering adopting a local ordinance (reach code) intended to support meeting local and/or statewide energy efficiency and greenhouse gas reduction goals. The program facilitates adoption and implementation of the code when requested by local jurisdictions by providing resources such as cost-effectiveness studies, model language, sample findings, and other supporting documentation.

The California Building Energy Efficiency Standards Title 24, Part 6 (Title 24) (CEC, 2019) is maintained and updated every three years by two state agencies: the California Energy Commission (the Energy Commission) and the Building Standards Commission (BSC). In addition to enforcing the code, local jurisdictions have the authority to adopt local energy efficiency ordinances—or reach codes—that exceed the minimum standards defined by Title 24 (as established by Public Resources Code Section 25402.1(h)2 and Section 10-106 of the Building Energy Efficiency Standards).

Local jurisdictions must demonstrate that the requirements of the proposed ordinance are cost-effective and do not result in buildings consuming more energy than is permitted by Title 24. In addition, the jurisdiction must obtain approval from the Energy Commission and file the ordinance with the BSC for the ordinance to be legally enforceable.

The Department of Energy (DOE) sets minimum efficiency standards for equipment and appliances that are federally regulated under the National Appliance Energy Conservation Act, including heating, cooling, and water heating equipment (E-CFR, 2020). Since state and local governments are prohibited from adopting higher minimum efficiencies than the federal standards require, the focus of this study is to identify and evaluate cost-effective packages that do not include high efficiency heating, cooling, and water heating equipment. High efficiency appliances are often the easiest and most affordable measure to increase energy performance. While federal preemption limits reach code mandatory requirements for covered appliances, in practice, builders may install any package of compliant measures to achieve the performance requirements.
154
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Methodology and Assumptions
7 California Energy Codes & Standards | A statewide utility program 2024-04-25 2 Methodology and Assumptions

2.1 Analysis for Reach Codes
This section describes the approach to calculating cost-effectiveness including benefits, costs, metrics, and utility rate selection.

2.1.1 Modeling
The Reach Codes Team performed energy simulations using the 2025 research version of the Residential California Building Energy Code Compliance software (CBECC). The 2025 version of CBECC was used instead of the 2022 version to take advantage of updated weather files and metrics. Site energy results are similar between CBECC-Res 2022 and 2025; however, the 2025 compliance metrics applies assumptions reflective of an electrified future, such as high escalation for natural gas retail rates, which favors electric buildings. In addition, in 2025 the weather stations were changed in Climate Zones 4 and 6 from San Jose to Paso Robles and Torrance to Los Angeles International Airport, respectively.

Three unique building vintages are considered: pre-1978, 1978-1991, and 1992-2010. The vintages were defined based on review of historic Title 24 code requirements and defining periods with distinguishing features. Prospective energy efficiency measures were identified and modeled to determine the projected site energy (therm and kWh), source energy, GHG emissions, and LSC (long-term systemwide cost) impacts. Annual utility costs were calculated using hourly data output from CBECC, and current (as of 11/01/2023) electricity and natural gas tariffs for each of the investor-owned utilities (IOUs) appropriate for that climate zone.

Equivalent CO2 emission reductions were calculated based on outputs from the CBECC-Res simulation software.

Electricity emissions vary by region and by hour of the year. CBECC-Res applies two distinct hourly profiles, one for Climate Zones 1 through 5 and 11 through 13 and another for Climate Zones 6 through 10 and 14 through 16. Natural gas emissions do not vary hourly. To compare the mixed-fuel and all-electric cases side-by-side, GHG emissions are presented as lbs CO2-equivalent (CO2e) emissions.

The Statewide Reach Codes Team designed the analysis approach and selected measures for evaluation based on the 2019 existing building single family reach code analysis (Statewide Reach Codes Team, 2021) and work to support the 2025 Title 24 code development cycle as well as from outreach to architects, builders, and engineers.

2.1.2 Prototype Characteristics
The Energy Commission defines building prototypes which it uses to evaluate the cost-effectiveness of proposed changes to Title 24 requirements. Average home size has steadily increased over time,6 and the Energy Commission single family new construction prototypes are larger than many existing single family homes across California. For this analysis, a 1,665 square foot prototype was evaluated. Table 1 describes the basic characteristics of the single family prototype. Additions are not evaluated in this analysis as they are already addressed in Section 150.2 of Title 24, Part

6. The CEC has proposed changes to the 2025 Energy Code that would remove the allowance of gas space heating and water heating equipment for additions and instead require additions to follow the same space heating and water heating equipment requirements as new construction (California Energy Commission, 2023). The proposed prescriptive requirements for single family new construction homes are heat pump space heaters and water heaters, with gas equipment only allowed in the performance approach. 6 https://www.census.gov/const/C25Ann/sftotalmedavgsqft.pdf 155
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Methodology and Assumptions
8 California Energy Codes & Standards | A statewide utility program 2024-04-25 Table 1. Prototype Characteristics
Specification
Existing Conditioned Floor Area 1,665 ft2
Num. of Stories 1
Num. of Bedrooms 3
Window-to-Floor Area Ratio 13%
Attached Garage 2-car garage
Three building vintages were evaluated to determine sensitivity of existing building performance on cost-effectiveness of upgrades. For example, it is widely recognized that adding attic insulation in an older home with no insulation is costeffective, however, newer homes will likely have existing attic insulation reducing the cost-effectiveness of an incremental addition of insulation. The building characteristics for each vintage were determined based on either prescriptive requirements from Title 24 that were in effect or standard construction practice during that time period.

Homes built under 2001 Title 24 are subject to prescriptive envelope code requirements very similar to homes built under the 2005 code cycle, which was in effect until January 1, 2010.

Table 2 summarizes the assumptions for each of the three vintages. Additionally, the analysis assumed the following features when modeling the prototype buildings. Efficiencies were defined by year of the most recent equipment replacement based on standard equipment lifetimes.
• Individual space conditioning and water heating systems, one per single family building. • Split-system air conditioner with natural gas furnace. o Scenarios with an existing natural gas wall furnace without AC were also evaluated. • Small storage natural gas water heater.
o Scenarios with an existing electric resistance storage water heater were also evaluated. • Gas cooktop, oven, and clothes dryer.

The methodology applied in the analyses begins with a design that matches the specifications as described in Table 2 for each of the three vintages. Prospective energy efficiency measures were modeled to determine the projected energy performance and utility cost impacts relative to the baseline vintage. In some cases, where logical, measures were packaged together.
156
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades Methodology and Assumptions
9 California Energy Codes & Standards | A statewide utility program 2024-04-25 Table 2. Efficiency Characteristics for Three Vintage Cases Building Component Efficiency
Feature
Vintage Case
Pre-1978 1978-1991 1992-2010
Envelope
Exterior Walls 2x4, 16-inch on center wood frame,
R-0a
2x4 16 inch on center wood frame,
R-11
2x4 16 inch on center wood frame,
R-13
Foundation Type & Insulation Uninsulated slab (CZ 2-15) Raised floor, R-0 (CZ 1 & 16)
Uninsulated slab (CZ 2-15)
Raised floor, R-0 (CZ 1 & 16)
Uninsulated slab (CZ 2-15)
Raised floor, R-19 (CZ 1 & 16)
Ceiling Insulation & Attic Type
Vented attic, R-5 @ ceiling level for CZ
6 & 7,
Vented attic, R-11 @ ceiling level
(all other CZs)
Vented attic, R-19 @ ceiling level Vented attic, R-30 @ ceiling level Roofing Material & Color Asphalt shingles, dark
(0.10 reflectance, 0.85 emittance)
Asphalt shingles, dark
(0.10 reflectance, 0.85 emittance)
Asphalt shingles, dark
(0.10 reflectance, 0.85 emittance)
Radiant Barrier No No No
Window Type: U-factor/SHGCb Metal, single pane: 1.16/0.76 Metal, dual pane: 0.79/0.70 Vinyl, dual pane Low-E: 0.55/0.40 House Infiltration at 50 Pascals 15 ACH50 10 ACH50 7 ACH50 HVAC Equipment
Heating Efficiency 78 AFUE (assumes 2 replacements) 78 AFUE (assumes 1 replacement) 78 AFUE Cooling Efficiency 10 SEER (assumes 2 replacements) 10 SEER (assumes 1 replacement) 13 SEER, 11 EER Duct Location & Details Attic, R-2.1, 30% leakage at 25 Pa Attic, R-2.1, 25% leakage at 25 Pa Attic, R-4.2, 15% leakage at 25 Pa Whole Building Mechanical
Ventilation None None None
Water Heating Equipment
Water Heater Efficiency 0.575 Energy Factor (assumes 2
replacements)

0.575 Energy Factor (assumes 1
replacement) 0.575 Energy Factor
Water Heater Type 40-gallon gas storage 40-gallon gas storage 40-gallon gas storage Pipe Insulation None None None
Hot Water Fixtures Standard, non-low flow Standard, non-low flow Standard, non-low flow a Pre-1978 wall modeled with R-5 cavity insulation to better align wall system performance with monitored field data and not overestimate energy use. b Window type selections were made based on conversations with window industry expert, Ken Nittler. If a technology was entering the market during the time period (e.g., Low-E during 1992-2010 or dual-pane during 1978-1991) that technology was included in the analysis. This provides a conservative assumption for overall building performance and additional measures may be cost-effective for buildings with lower performing windows, for example buildings with metal single pane windows in the 1978- 1991 vintage.
157
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 10 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25

2.1.3 Cost-Effectiveness Approach

2.1.3.1 Benefits
This analysis used two different metrics to assess the cost-effectiveness of the proposed upgrades. Both methodologies require estimating and quantifying the incremental costs and energy savings associated with each energy efficiency measure. The main difference between the methodologies is the way they value energy impacts (the numerator in the benefit cost calculation):

Utility Bill Impacts (On-Bill): This customer-based lifecycle cost (LCC) approach values energy based upon estimated site energy usage and customer utility bill savings using the latest electricity and natural gas utility tariffs available at the time of writing this report. Total savings are estimated over a 30-year duration and include discounting of future utility costs, as well as assumed energy cost inflation over time.

Long-term Systemwide Cost (LSC): Formerly known as Time Dependent Valuation (TDV) energy cost savings, LSC reflects the Energy Commission’s current LCC methodology, which is intended to capture the total value or cost of energy use over 30 years. This method accounts for the hourly cost of marginal generation, transmission and distribution, fuel, capacity, losses, and cap-and-trade-based CO2 emissions (California Energy Commission, 2023).

This is the methodology used by the Energy Commission in evaluating cost-effectiveness for efficiency measures in the 2025 Energy Code.

2.1.3.2 Costs
The Reach Codes Team assessed the incremental costs of the measures and packages over a 30-year analysis period. Incremental costs represent the equipment, installation, replacement, and maintenance costs of the proposed measure relative to the 2022 Title 24 Standards minimum requirements or standard industry practices. Present value of replacement cost is included only for measures with lifetimes less than the 30-year evaluation period. In cases where at the end of the analysis period the measure has useful life remaining, the value of this remaining life is calculated and credited in the total lifetime cost.

2.1.3.3 Metrics
Cost-effectiveness is presented using net present value (NPV) and benefit-to-cost (B/C) ratio metrics.

NPV: Equation 1 demonstrates how lifetime NPV is calculated. If the NPV of a measure or package is positive, it is considered cost-effective. A negative value represents a net increase in costs over the 30-year lifetime.

B/C Ratio: This is the ratio of the present value of all benefits to the present value of all costs over 30 years (present value benefits divided by present value costs). A value of one indicates the NPV of the savings over the life of the measure is equivalent to the NPV of the lifetime incremental cost of that measure. A value greater than one represents a positive return on investment. The B/C ratio is calculated according to Equation 2.

Equation 1
𝑁𝑁𝑁𝑁𝑁𝑁 = 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣 𝑜𝑜𝑜𝑜 𝑙𝑙 𝑙𝑙𝑙𝑙 𝑏𝑏 − 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣 𝑜𝑜𝑜𝑜 𝑙𝑙 𝑙𝑙𝑙𝑙 𝑐𝑐 Equation 2
𝐵𝐵 − − 𝐶𝐶 𝑅𝑅 = 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣 𝑜𝑜𝑜𝑜 𝑙𝑙 𝑙𝑙𝑙𝑙 𝑏𝑏
𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣 𝑜𝑜𝑜𝑜 𝑙𝑙 𝑙𝑙𝑙𝑙 𝑐𝑐
Improving the efficiency of a project often requires an initial incremental investment. In most cases the benefit is represented by annual On-Bill utility or LSC savings, and the cost is represented by incremental first cost and future replacement costs. Some packages result in initial construction cost savings relative to the assumed base case scenario, and either energy cost savings (positive benefits), or increased energy costs (negative benefits). In cases where both construction costs and energy-related savings are negative, the construction cost savings are treated as the ‘benefit’ while the increased energy costs are the ‘cost.’ In cases where a measure or package is costeffective immediately (i.e., upfront construction cost savings and lifetime energy cost savings), B/C ratio costeffectiveness is represented by “>1”. 158
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 11 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 The lifetime costs or benefits are calculated according to Equation 3.

Equation 3
𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣 𝑜𝑜𝑜𝑜 𝑙𝑙 𝑙𝑙𝑙𝑙 𝑐𝑐 𝑜𝑜 𝑏𝑏 = �(𝐴𝐴 𝑐𝑐 𝑜𝑜 𝑏𝑏 )𝑡𝑡
(1 + )𝑡𝑡
𝑛𝑛
𝑡𝑡=0
Where:

1. n = analysis term in years

2. r = discount rate
The following summarizes the assumptions applied in this analysis to both methodologies.

3. Analysis term of 30 years

4. Real discount rate of three percent
Both base case measures and alternative energy efficiency measures may have different lifetime assumptions which impact life cycle economics. Future costing of many of the evaluated electrification measures are only based on current cost assumption, which may be overly conservative as the expected growth in heat pump-based technologies is growing rapidly and will likely lead to future cost reductions (at least relative to current fossil fueled equipment) as production volumes increase.

2.1.4 Utility Rates
In coordination with the CA IOU rate team (comprised of representatives from Pacific Gas and Electric (PG&E), Southern California Edison (SCE) and San Diego Gas and Electric (SDG&E)) and two Publicly-Owned-Utilities (POUs) (Sacramento Municipal Utility District (SMUD) and City of Palo Alto Utilities (CPAU)), the Reach Codes Team determined appropriate utility rates for each climate zone to calculate utility costs and determine On-Bill costeffectiveness for the proposed measures and packages. The utility tariffs, summarized in Chapter 6.2, were determined based on the appropriate rate for each case in each territory. Utility rates were applied to each climate zone based on the predominant IOU serving the population of each zone, with a few climate zones evaluated multiple times under different utility scenarios. Climate Zones 10 and 14 were evaluated with both SCE for electricity and Southern California Gas Company (SoCalGas) for gas and SDG&E tariffs for both electricity and gas since each utility has customers within these climate zones. Climate Zone 5 is evaluated under both PG&E and SoCalGas natural gas rates.

Two POU or municipal utility rates were also evaluated: SMUD in Climate Zone 12 and CPAU in Climate Zone 4.

For cases with onsite generation (i.e. solar photovoltaics (PV)), the approved NBT tariffs were applied along with monthly service fees and hourly export compensation rates for 2024.7 In December 2022, the California Public Utilities Commission (CPUC) issued a decision adopting NBT as a successor to NEM 2.0 that went into effect April of 20238.

Utility rates are assumed to escalate over time according to the assumptions from the CPUC 2021 En Banc hearings on utility costs through 2030 (California Public Utilities Commission, 2021a). Escalation rates through the remainder of the 30-year evaluation period are based on the escalation rate assumptions within the 2022 TDV factors. The Statewide Natural Gas Residential Average Rate for 2023 through 2030 is projected to be 4.6%. The Electric Residential Average Rate for PG&E, SCE and SDG&E for 2023 through 2030 is projected to be 1.8%,1.6% and 2.8% respectively. A second set of escalation rates were also evaluated to demonstrate the impact that utility cost changes have on cost-effectiveness over time. This utility rate escalation sensitivity analysis, presented in Section 3.2.4, was based on those used within the 2025 LSC factors (LSC replaces TDV in the 2025 code cycle) which assumed steep 7 Hourly export compensation rates were based on the NBT spreadsheet model created by E3 for the CPUC. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/net-energy-meteringnem/nemrevisit/nbt-model--12142022.xlsb 8 https://www.cpuc.ca.gov/nemrevisit 159
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 12 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 increases in gas rates in the latter half of the analysis period. See Appendix 6.2.7 Fuel Escalation Assumptions for details.

Future electricity tariff structures are expected to evolve over time, and the CPUC has an active proceeding to adopt an income-graduated fixed charge that benefits low-income customers and supports electrification measures.10 These were not included in this analysis but may be evaluated later in 2024 once the rates are finalized.

2.1.5 Measure Cost Data Collection Approach
To support this effort, a detailed cost study was completed in the summer of 2023 to gather data from a range of contractors to inform actual installed costs in the areas they provide services. These areas include HVAC, plumbing, envelope and air-sealing, and PV installation. Home performance contractors were also approached to collect this data. Collecting this type of data is challenging, both due to contractor reticence to share cost information and due to the timing of the survey which unfortunately coincided with the summer busy season for most contractors, especially HVAC installers. With these known challenges, the outreach effort focused on leveraging existing relationships between the analysis team and contractors to both gain access and provide assurance that all cost data would remain confidential and aggregated. Contractors that provided feedback were nominally compensated for their time.

The collected cost data was intended to represent recent costs for a “typical” retrofit installation. Each home in which a contractor does work has different site-specific issues that will likely affect costs. In addition, different jurisdictions have different levels of building department installation oversight and permit fees. Finally, each contractor typically has a different manufacturer product line they prefer to install. All these factors will influence installed costs11.

The most detailed and broad cost request was for the HVAC contractors, as there are a wide range of equipment replacement scenarios available for an existing ducted gas furnace with central split-system air conditioning. Options range from a base case scenario (like for like swap out), split-system heat pump replacement, dual fuel heat pumps (DFHP), ducted mini-split heat pumps, non-ducted mini-splits, etc. For plumbing contractors, a range of scenarios existed for water heater replacements including like-for-like replacement, HPWHs (in different locations- garage, indoor), need for electrical upgrade for HPWH installation, need for HPWH ducting, etc. Envelope measures focused on attic and wall insulation, window replacement, re-roofing (with Cool Roof materials or not), and attic ceiling plane airsealing. PV costing included different system sizes, panel upgrades costs, and battery costs. Home performance contractors were asked to provide as much data as they could on the different measure options. All costing information requested was intended to represent most recent installations, in an effort to capture current pricing as best as possible.

The contractors that responded with their cost estimates work in different regions of the state, operate in different markets with (potentially) different local efficiency incentives, do varying amounts of work based on the size of their company, target different market demographic sectors, and install different brands of equipment. All these factors will contribute to price variability. The Team considered applying climate zone specific cost adjustments to reflect some of these differences, but ultimately decided not to since a climate zone is not a monolithic entity with uniform customer pricing throughout. The Team recognizes that “zip code” pricing is a reality, but for simplicity, as well as consistency with Title 24, Part 6 code development costing approaches, applied uniform statewide costs to all measures.

2.2 Measure Details and Cost
This section describes the details of the measures and documents incremental costs. All measure costs were obtained from the contractor survey unless otherwise noted. All contractor provided costs reflect the cost to the customer and 10 https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electric-costs/demand-response-dr/demandflexibility-rulemaking 11 One HVAC contractor mentioned that equipment brand alone may contribute to a +/-%5 variation in the total bid cost.
160
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 13 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 include equipment, labor, permit fees, and required HERS testing. Additional details of the measures can be found in Appendix Section Error! Reference source not found..

All measures are evaluated assuming they are not otherwise required by Title 24. For example, duct sealing is required by code whenever HVAC equipment is altered. For this analysis duct sealing was evaluated for those projects where it is not already triggered by code (i.e., no changes to the heating or cooling equipment). Where appropriate, measure requirements align with those defined in Title 24. In some cases, cost-effective measures were identified that exceed Title 24 requirements, such as attic insulation, cool roofs, and duct sealing.

2.2.1 Building Envelope & Duct Measures
The following are descriptions of each of the efficiency upgrade measures applied in this analysis.

Attic Insulation: Add attic insulation in buildings with vented attic spaces to meet either R-38 or R-49. The pre-1978 vintage assumes an existing condition of R-11, the 1978-1991 vintage assumes an existing condition of R-19, and the 1992-2010 vintage assumes R-30 as the existing insulation level. For pre-1978 vintage homes this measure was also evaluated to include air sealing of the attic. A 14% leakage reduction was modeled such that 15 ACH50 was reduced to 12.9 ACH50 in this measure. The costs for this measure include removing existing insulation.

Air Sealing and Weather-stripping: Apply air sealing practices throughout all accessible areas of the building. For this study, it was assumed that older vintage homes would be leakier than newer buildings and that approximately 30 percent improvement in air leakage is achievable through air sealing of all accessible areas. For modeling purposes, it was assumed that air sealing can reduce infiltration levels from 15 to ten air changes per hour at 50 Pascals pressure difference (ACH50) in the oldest vintages (pre-1978), to ten to seven ACH50 for the 1978-1991 vintage, and seven to five ACH50 in the 1992-2010 vintage.

Cool Roof: For steep slope roofs, install a roofing product rated by the Cool Roof Rating Council (CRRC) with an aged solar reflectance of 0.20 or 0.25 and thermal emittance of 0.75 or higher. This measure only applies to buildings that are installing a new roof as part of the scope of the remodel; the cost and energy savings associated with this upgrade reflects the incremental step between a standard roofing product with one that is CRRC rated with an aged solar reflectance of 0.20 or 0.25. This is similar to cool roof requirements in 2022 Title 24 Section 150.2(b)1Ii but assumes a higher solar reflectance.

Radiant Barrier: Add radiant barrier to any existing home vintage. This measure only applies to buildings that are installing a new roof as part of the scope of the remodel; the cost and energy savings associated with this upgrade reflects the incremental step between a standard roofing product with one that includes a laminated radiant barrier.

Raised Floor Insulation: In existing homes with raised floors and no insulation (pre-1978 and 1978-1991 vintages), add R-19 insulation. An upgraded R-30 floor insulation, assuming no current insulation, was evaluated in the pre-1978 and 1978-1991 vintages.

Wall Insulation: Blow-in R-13 wall insulation in existing homes without wall insulation (pre-1978 vintages).

Window Replacement: Replace existing windows with a non-metal dual-pane product, which has a U-factor equal to

0.28 Btu/hour-ft2-°F or lower and a Solar Heat Gain Coefficient (SHGC) equal to 0.23 or lower, except in heating dominated climates (Climate Zones 1, 3, 5, and 16) where an SHGC of 0.35 was evaluated.

Duct Sealing, New Ducts, and Duct Insulation: Air seal all ductwork to meet the requirements of the 2022 Title 24, Part 6 Section 150.2(b)1E. For this analysis, final duct leakage values of ten percent (proposed revised leakage rate for 2022 Title 24) was evaluated. The pre-1978 and 1978-1992 vintages assume leaky existing ducts (25-30% leakage).

The 1992-2010 vintage assumes moderately leaky existing ducts (15-20% leakage).

Replacing existing ductwork with entirely new ductwork to meet Sections 150.2(b)1Di and 150.2(b)1Diia of the 2022 Title 24 was also evaluated. This assumed new ducts meet 5% duct leakage and the option of R-6 and R-8 duct insulation in all climate zones.
161
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 14 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 Table 3 summarizes the cost assumptions for the building envelope and HVAC duct improvement measures evaluated.

All the measures in Table 3 assume a 30-year effective useful life.

Table 3. Measure Cost Assumptions – Efficiency & Duct Measures Measure Performance Level
Incremental Cost –
Single Family Building
Pre 1978 1978 – 1991 1992 - 2010
Wall Insulation R-13 $2,950 N/A N/A
Raised Floor
Insulation
R-19 $3,633 $3,633 N/A
R-30 $4,113 $4,113 $4,113
Attic Insulation
R-38 $6,762 $2,555 $1,781
R-49 $7,446 $3,612 $1,827
Air Sealing
10 ACH50 $4,684 N/A N/A
7 ACH50 N/A $4,684 N/A
5 ACH50 N/A N/A $4,684
Cool Roof

0.25 Aged Solar Reflectance
CZs 1-3,5-7,16 $2,407 $2,407 $2,407

0.25 Aged Solar Reflectance
CZs 4, 8-15 $1,203 $1,203 $1,203
Window
U-factor/SHGC

0.28 U-factor. 0.23 SHGC in
CZs 2,4,6-15. $11,463 $11,463 $11,463

0.28 U-factor. 0.35 SHGC in
CZs 1,3,5,26 $11,871 $11,871 $11,871
Radiant Barrier Add Radiant Barrier $893 $893 $893
Duct Sealing 10% nominal airflow $2,590 $2,590 $1,400
All New Duct
System
R-6 ducts;
5% duct leakage $4,808 $4,808 $4,808
R-8 ducts;
5% duct leakage $6,311 $6,311 $6,311

2.2.2 PV Measures
Installation of on-site PV is required in the 2022 Title 24 code for new construction homes, but there are no PV requirements for additions or alterations to existing buildings. PV was evaluated in CBECC-Res according to the California Flexible Installation (CFI) 1 assumptions and 98% solar access. To meet CFI eligibility, the requirements of 2022 Reference Appendices JA11.2.2 (California Energy Commission, 2021b) must be met. A 3 kW PV system was modeled both as a standalone measure as well as coupled with heat pump installations.

The costs for installing PV are summarized in Table 4. They include the first cost to purchase and install the system, future inverter replacement costs, and annual maintenance costs. Upfront solar PV system costs are estimated from the contractor surveys to be $4.58/WDC and are reduced by 30 percent to account for the federal income Residential Clean Energy Credit. The solar panels are estimated to have an effective useful life of 30 years and the inverter 25 years. The inverter replacement cost of $7,000 (future value) is also from the contractor surveys. System maintenance costs are taken from the 2019 PV CASE Report (California Energy Commission, 2017) and are assumed to be 162
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 15 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 $0.31/WDC present value. These costs do not include costs associated with electrical panel upgrades, which will be necessary in some instances.

Table 4. Measure Descriptions & Cost Assumptions – PV
Measure Performance
Level
Incremental Cost
Pre 1978 1978 – 1991 1992 - 2010
PV 3 kW $9,608

2.2.3 Equipment Fuel Substitution Measures – Heat Pump Equipment The fuel substitution measures are evaluated as replacements at the end of the life of the existing equipment. This means the baseline compared against is usually a like-for-like change-out of the natural gas equipment, and the upgrade is a heat pump.

For most of the space heating and water heating cases, costs for electrical service panel upgrades are not included as it is assumed many existing homes have the service capacity to support converting one appliance from gas to electric.

For homes with existing air conditioners, any incremental electric capacity necessary to support a heat pump space heater is marginal. The same applies for homes with existing electric resistance equipment. Section 3.2.4 presents the impacts for select cases where an upgrade to the electric panel is required.

Heat Pump Space Heating
All the heat pump space heater (HPSH) measures are described below. All were evaluated with HERS verified refrigerant charge aligned with the proposed code requirements for the 2025 Title 24 code. Dual fuel heat pumps (DFHPs) were controlled to lockout furnace operation above 35°F.

DFHP (Existing Furnace): Replace existing ducted air conditioner (AC) with an electric heat pump and install controls to operate the heat pump to use the existing gas furnace for backup heat. A minimum federal efficiency (14.3 SEER2,

11.7 EER2, 7.5 HSPF2) heat pump was evaluated. Savings are compared to a new AC (14.3 SEER2, 11.7 EER2) alongside the existing furnace (78 AFUE).

DFHP (New Furnace): Replace existing ducted AC and natural gas furnace with an electric heat pump and new gas furnace plus controls to operate the heat pump and use the new gas furnace for backup heat. A minimum federal efficiency (14.3 SEER2, 11.7 EER2, 7.5 HSPF2) heat pump and furnace (80 AFUE) were evaluated to replace existing equipment. Savings are compared to a new ducted AC and natural gas furnace (14.3 SEER2, 11.7 EER2, 80 AFUE).

Heat Pump Space Heater: Replace existing ducted AC and natural gas furnace with an electric heat pump. Minimum federal efficiency (14.3 SEER2, 11.7 EER2, 7.5 HSPF2) and higher efficiency (17 SEER2, 12.48 EER2, 9.5 HSPF2) heat pumps were evaluated. Savings are compared to a new ducted natural gas furnace and AC (14.3 SEER2, 11.7 EER2, 80 AFUE).

Ducted Mini-Split Heat Pump (MSHP): Replace existing ducted AC and natural gas furnace with a ducted high efficiency MSHP (16.5 SEER2, 12.48 EER2, 9.5 HSPF2). Savings are compared to a new ducted AC and natural gas furnace (14.3 SEER2, 11.7 EER2, 80 AFUE).

Ductless MSHP: In a home without AC, replace existing wall furnace with a ductless MSHP. A standard efficiency unit meeting minimum federal efficiency standards (14.3 SEER2, 11.7 EER2, 7.5 HSPF2) was evaluated by modeling the variable capacity heat pump (VCHP) compliance credit in CBECC-Res. A premium, higher efficiency upgrade was also 163
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 16 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 evaluated using CBECC-Res’ detailed VCHP model12 by simulating the performance of a representative high efficiency product (14.3 SEER2, 11.7 EER2, 7.5 HSPF2). Savings are compared to a new natural gas wall furnace with fan distribution (75% AFUE) and window AC (9 CEER).

Over the 30-year analysis period, certain changes are assumed when the equipment is replaced that impact both lifetime costs and energy use. Table 5 presents the lifetime scenario for the DFHP (existing furnace) measure. The analysis assumed a 20-year effective useful lifetime (EUL) for a furnace, a 15-year EUL for an air conditioner and a 15- year EUL for a heat pump. Lifetimes are based on the Database for Energy Efficient Resources (DEER) (California Public Utilities Commission, 2021b). The existing furnace is assumed to be halfway through its EUL at the beginning of the analysis period. After 10 years when the furnace reaches the end of its life and needs to be replaced, it will be subject to new federal efficiency standards for residential gas furnaces that go into effect in 2028 requiring 95 AFUE13. 5 years later the air conditioner reaches the end of its life and is replaced with a new air conditioner.

For the DFHP upgrade case, after 10 years when the furnace fails it’s expected that the furnace will be abandoned in place since the heat pump serves primary heating and was sized to provide the full design heating load. In this case it is assumed that the fan motor would be replaced with a new aftermarket unit and would operate another 5 years until the heat pump fails and is replaced with a new heat pump and air handler.

The other ducted heat pump cases similarly apply a 95 AFUE furnace in the baseline when the furnace reaches its EUL after 20 years.

Table 5. Lifetime Analysis Replacement Assumptions for DFHP (Existing Furnace) Scenario Year Baseline Upgrade
0 AC fails, install new AC,
keep existing furnace
AC fails, install new HP,
keep existing furnace
10 Furnace fails, install new
95AFUE furnace
Furnace fails, replace fan
motor
15 AC fails, install new AC HP fails, install new HP
and air handler
Costs were applied based on the system capacity from heating and cooling load calculations in CBECC-Res as presented in Table 6. Air conditioner nominal capacity was calculated as the CBECC-Res cooling load, rounded up to the nearest half ton. Heat pump nominal capacity was calculated as the maximum of either the CBECC-Res heating or cooling load, rounded up to the nearest half ton. In both cases a minimum capacity of 1.5-ton was applied as this represents the typical smallest available split system heat pump equipment. Load calculations demonstrated that Climate Zones 2 - 15 were cooling-dominated while Climate Zones 1 and 16 were heating-dominated. In the heating dominated climate zones the heat pump needed to be upsized relative to an air conditioner that only provides cooling. 12 The detailed VCHP option allows for the user to input detailed specifications based on the published National Energy Efficiency Partnership (NEEP) manufacturer specific performance data. It is not currently available for compliance analysis.
13 https://www.energy.gov/articles/doe-finalizes-energy-efficiency-standards-residential-furnaces-save-americans-15- billion#:~:text=These%20furnace%20efficiency%20standards%20were,heat%20for%20the%20living%20space. 164
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 17 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 Table 6. System Sizing by Climate Zone
Climate
Zone
Air Conditioner
Capacity (tons)
Heat Pump
Capacity (tons)
1 1.5 3.0
2 3.5 3.5
3 2.5 2.5
4 3.5 3.5
5 3.0 3.0
6 3.0 3.0
7 3.0 3.0
8 4.0 4.0
9 4.0 4.0
10 4.0 4.0
11 4.5 4.5
12 4.0 4.0
13 4.5 4.5
14 4.0 4.0
15 5.0 5.0
16 3.5 4.0
Table 7 presents estimated first and lifetime costs for the various ducted baseline and heat pump scenarios for 4-ton equipment. Costs include all material and installation labor including providing new 240 V electrical service to the air handler location for all new air handler installations and decommissioning of the furnace for the cases where the furnace is removed. DFHP costs incorporate controls installation and commissioning to ensure the heat pump and the furnace communicate properly and don’t operate at the same time. Future replacement costs do not include any initial costs associated with 240V electrical service or furnace decommissioning.

Table 8 presents estimated first and lifetime costs for the ductless baseline and 2 heat pump scenarios, also for 4-ton heat pump equipment. EULs are based on 20 years for the gas wall furnace, 10 years for the window AC, and 15 years for the heat pump.14
14 The gas wall furnace and heat pump EULs were based on DEER (California Public Utilities Commission, 2021b).

Gas wall furnace lifetime was assumed to be the same as for central gas furnace equipment. Room air conditioner EUL was based on the DOE’s latest rulemaking for room air conditioned (Department of Energy, 2023). DOE determined an average lifetime of 9.3 years, which was rounded up to 10 years for this analysis. 165
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 18 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 Table 7. Ducted HVAC Measure Cost Assumptions – 4-Ton Electric Replacements Case AC + Coil
Gas
Furnace
/AC
DFHP
(Existing
Furnace)
DFHP (New
Furnace)
Min. Eff.

Heat Pump
High Eff.

Heat
Pump
Ducted
MSHP
Base Case - - AC + Coil
Gas
Furnace
/AC
Gas
Furnace
/AC
Gas
Furnace
/AC
Gas
Furnace
/AC
First Cost $10,402 $16,653 $12,362 $20,676 $17,825 $20,802 $18,075 Replacement Cost
(Future Value) $19,365 $19,365 $19,025 $19,025 $16,825 $19,802 $18,075 Replacement Cost
(Present Value) $13,346 $11,639 $12,334 $12,897 $10,800 $12,710 $11,601 Remaining Value
at Year 30 $0 ($1,846) $0 ($1,846) $0 $0 $0
Total Lifecycle
Cost $23,748 $26,446 $24,696 $31,727 $28,625 $33,512 $29,676 Incremental Cost - - $948 $5,281 $2,179 $7,066 $3,230
Table 8. Non-Ducted HVAC Measure Cost Assumptions – 4-Ton Electric Replacements Wall Furnace
+ Window AC
Min. Eff.

Ductless
MSHP
High Eff.

Ductless
MSHP
First Cost $4,075 $17,412 $21,342
Replacement Cost (Future Value) $4,075 $17,412 $21,342
Replacement Cost (Present Value) $3,365 $11,176 $13,698 Remaining Value at Year 30 ($532) $0 $0
Total Lifecycle Cost $6,908 $28,588 $35,040
Incremental Cost - $21,680 $28,132
Heat Pump Water Heating:

The heat pump water heater (HPWH) measures are described below, and costs are presented in Table 9 and Table

10. The most typical scenario in California is a home with existing natural gas storage tank water heaters. However, there are also many existing homes with existing electric resistance storage tank water heaters and this work considers both baselines. This analysis evaluates the following 65-gallon replacement HPWHs:

1. HPWH that meets the federal minimum efficiency requirements of UEF 2.0

2. HPWH that meets the Northwest Energy Efficiency Alliance (NEEA)15 Tier 3 rating (3.45 UEF)

3. HPWH that meets the NEEA Tier 4 rating and that has demand response (DR) or load shifting control capability (4.02 UEF)

4. 120V HPWH that meets the NEEA Tier 3 rating (3.3 UEF). 15 Based on operational challenges experienced in the past, NEEA established rating test criteria to ensure newly installed HPWHs perform adequately, especially in colder climates. The NEEA rating requires an Energy Factor equal to the ENERGY STAR® performance level and includes requirements regarding noise and prioritizing heat pump use over supplemental electric resistance heating. 166
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 19 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 The four cases above were evaluated with the HPWH located within an attached garage. Additionally, three separate cases for the federal minimum efficiency HPWH were analyzed to consider the impacts of location on performance and cost-effectiveness. These locations included the following:

1. Exterior closet.

2. Interior closet, no ducting.

3. Interior closet, ducted to the outside.

Additional costs for providing electrical wiring to these locations and for providing ductwork were included. Savings are compared to a new 50-gallon natural gas storage water heater (UEF 0.63) or a new 50-gallon electric water heater (UEF 0.92).

For this analysis, a HPWH that just meets the federal minimum efficiency standards of close to 2.0 Uniform Energy Factor (UEF) was evaluated in order to satisfy preemption requirements. However, the Reach Codes Team is not aware of any 2.0 UEF products that are available on the market. The lowest UEF reported for certified products in the Northwest Energy Efficiency Alliance (NEEA)16 database is 2.73. In fact, of the four certification tiers offered by NEEA for high efficiency HPWHs, those meeting Tier 3 or Tier 4 are the dominant products on the market today. According to NEEA all major HPWH manufacturers are represented in NEEA’s qualified product list17 and there are fewer than 10 integrated products certified as Tier 1 or Tier 2, all of which have UEFs greater than 3.0.18 Therefore, in this analysis, we refer to the NEEA rated HPWH as the “market standard” HPWH.

The HPWH costs for the 120V and NEEA certified units are based on a larger (60 or 65 gallon) HPWH, as most contractors are upsizing the HPWH tank size relative to an equal volume, but higher capacity gas storage water heater.

Costs include all material and installation labor including providing a new 240 V electrical service to the water heater location (not needed for the 120V product). Water heating equipment lifetimes are based on DOE’s recent water heater rulemaking (Department of Energy, 2022) and assume 15-year EULs for both the baseline water heaters and the HPWHs.19 Future replacement costs for 240V HPWHs do not include any initial costs associated with 240V electrical service, condensate disposal, etc.

Table 9. Water Heating Measure Cost Assumptions – Existing Gas Gas
Storage
Water
Heater
240V
Fed.

Min.

HPWH
240V
Market
Std. NEEA
HPWH
240V
Market
Std. NEEA
HPWH +
DR
120V
Market
Std. NEEA
HPWH
240V Fed.

Min.

HPWH,
Exterior
Closet
240V Fed.

Min. HPWH,
Interior
Closet, Not
Ducted
240V Fed.

Min. HPWH,
Interior
Closet,
Ducted
First Cost $2,951 $7,283 $8,144 $8,144 $5,844 $7,702 $7,363 $8,442 Replacement Cost
(Future Value) $2,951 $6,413 $7,274 $7,274 $5,101 $6,413 $6,413 $6,413 Replacement Cost
(Present Value) $1,894 $4,116 $4,669 $4,669 $3,274 $4,116 $4,116 $4,116 Total Lifecycle Cost $4,845 $11,399 $12,813 $12,813 $9,118 $11,818 $11,479 $12,558 Incremental Cost - $6,554 $7,968 $7,968 $4,273 $6,973 $6,634 $7,713 16 Based on operational challenges experienced in the past, NEEA established rating test criteria to ensure newly installed HPWHs perform adequately, especially in colder climates. The NEEA rating requires products comply with ENERGY STAR and includes requirements regarding noise and prioritizing heat pump use over supplemental electric resistance heating.
17 https://neea.org/success-stories/heat-pump-water-heaters 18 As of 12/21/23: https://neea.org/img/documents/residential-unitary-HPWH-qualified-products-list.pdf 19 The recent DOE rulemaking references a lifetime of 14 years for gas storage water heaters and 14.8 years for electric storage water heaters. 15 years for each was used in this analysis for both types for simplification. 167
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 20 Methodology and Assumptions
California Energy Codes & Standards | A statewide utility program 2024-04-25 Table 10 presents similar costs to Table 9, except that the costs assume replacement of an existing 50-gallon electric storage water heater and does not include the 240 V electrical service cost.

Table 10. Water Heating Measure Cost Assumptions – Existing Electric Resistance Electric
Storage
Water
Heater
240V
Fed. Min.

HPWH
240V
Market
Std. NEEA
HPWH
240V
Market
Std. NEEA
HPWH +
DR
120V
Market
Std. NEEA
HPWH
240V Fed.

Min.

HPWH,
Exterior
Closet
240V Fed.

Min. HPWH,
Interior
Closet, Not
Ducted
240V Fed.

Min. HPWH,
Interior
Closet,
Ducted
First Cost $2,583 $6,413 $7,274 $7,274 $5,101 $6,413 $6,413 $7,492 Replacement Cost
(Future Value)
$2,583 $6,413 $7,274 $7,274 $5,101 $6,413 $6,413 $6,413 Replacement Cost
(Present Value)
$1,658 $4,116 $4,669 $4,669 $3,274 $4,116 $4,116 $4,116 Total Lifecycle Cost $4,241 $10,529 $11,943 $11,943 $8,375 $10,529 $10,529 $11,608 Incremental Cost - $6,288 $7,702 $7,702 $4,134 $6,288 $6,288 $7,367 168
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 21 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25 3 Results
The primary objective of the evaluation is to identify cost-effective energy upgrade measures and packages for existing single family buildings, to support the design of local ordinances requiring upgrades, which may be triggered by different events, such as at the time of a significant remodel or at burnout of mechanical equipment. In this report, the 1992-2010 vintage is shown for the equipment measures because it is the most conservative case (lowest loads), while the pre-1978 vintage is shown for the envelope and duct measures because some of those measures only apply to the pre-1978 vintage. A full dataset of all results can be downloaded at https://localenergycodes.com/content/resources.

Results alongside policy options can also be explored using the Cost-effectiveness Explorer at https://explorer.localenergycodes.com/.
169
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 22 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25

3.1 Cost-Effectiveness Results
The extensive analysis for this type of report leads to an overwhelming number of scenarios including different base cases, house vintages, replacement options, and climate zones. To simplify the reporting, the Statewide Reach Codes Team has relied on graphical representation of select key cases indicating high level measure cost effectiveness from either an On-Bill perspective, an LSC perspective, both metrics, or neither. Figure 1 through Figure 13 present this reduced set of results of the LSC and On-Bill cost-effectiveness conclusions across the 16 climate zones. In the cases where there are multiple utilities serving a single climate zone, an asterisk “*” label is added to separately show the alternate utility cases. These graphs provide a general sense of the findings. A full dataset of all results can be downloaded at https://localenergycodes.com/content/resources. Results alongside policy options can also be explored using the Cost-effectiveness Explorer at https://explorer.localenergycodes.com/.

3.1.1 HPSH Measures
Figure 1 through Figure 5 show the cost-effectiveness of space heating equipment replacement measures for the 1992-2010 vintage including the following cases. The 1992-2010 vintage results are presented here as this is the most conservative scenario for HPSH measures. In general, where a HPSH measure is cost-effective for a new home it was also found to be cost-effective for older homes.
• Dual fuel heat pump with existing furnace as backup.
• Standard efficiency ducted central heat pump replacement. • High efficiency ducted central heat pump replacement. • Ducted mini-split heat pump replacement.
• Standard efficiency ducted central heat pump replacement with 3kW PV system.

Figure 1: DFHP with Existing Furnace Figure 2: Standard Efficiency HPSH 170
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 23 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25 Figure 3: High Efficiency HPSH Figure 4: Ducted MSHP
Figure 5: HPSH + PV
171
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 24 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25

3.1.2 HPWH Measures
Figure 6 through Table 11 show the cost-effectiveness of water heater measures for the 1992-2010 vintage including the following cases. HPWH energy savings and LSC cost-effectiveness is not sensitive to home vintage but rather depends on the magnitude of hot water loads, which are typically driven by the number of occupants. On-Bill costeffectiveness does vary slightly by vintage due to the impact of the electrification tariff relative to the load profile of the existing home. The impact is largest for the HPWH + PV case where On-Bill cost-effectiveness improves for older homes or homes with overall higher energy use resulting in less exports to the grid for a fixed size PV system. • 240V federal minimum HPWH
• 240V market standard NEEA HPWH
• 120V market standard NEEA HPWH
• 240V federal minimum HPWH with 3kW PV
Figure 6: 240V Federal Minimum HPWH Figure 7: 240V Market Standard NEEA HPWH Figure 8: 120V Market Standard NEEA HPWH Figure 9: 240V Federal Minimum HPWH + PV 172
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 25 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25 • Envelope and Duct Measures
Figure 10 through Figure 13 show the cost-effectiveness results of envelope and duct measures for the pre-1978 vintage including the following measures. The pre-1978 vintage is presented as representing the most favorable existing conditions for cost-effective upgrades. Newer homes with higher performing envelope may still benefit from these types of upgrade measures, but cost-effectiveness is reduced. Some measures, like R-13 wall insulation, aren’t applicable to newer homes which would have been constructed originally with insulated walls. • New R-6 ducts
• 10% duct leakage
• R-13 wall insulation
• R-49 attic insulation
Figure 10: R-6 Ducts Figure 11: 10% Duct Leakage
Figure 12: R-13 Wall Insulation Figure 13: R-49 Attic Insulation 173
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 26 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25

3.2 Climate Zone Case Studies
To better understand the details of the results, a few climate zones were selected to provide a more detailed presentation of cost-effectiveness results. Section 3.2.1 through 3.2.3 show the first-year incremental cost, first-year utility savings, and NPV for a variety of cases. Section 3.2.4 shows the sensitivity of the cost effectiveness results due to varying utility escalation rates, the impact of CARE rates, future equipment cost assumptions, and the need for electrical panel upgrades. The climate zones were selected to be representative of areas of significant reach code activity. Please refer to the Cost-Effectiveness Explorer (Statewide Reach Codes, 2023) or the source dataset for the full analysis.

3.2.1 HPSH Cost-Effectiveness
Cost-effectiveness of heat pump space heating measures for Climate Zones 12 and 16 is summarized in Table 11 and Table 12 below. In Climate Zone 12, HPSH measures are cost-effective based on LSC in all cases except the ductless MSHP cases and are cost-effective On-Bill with SMUD rates in all cases except the DFHP case with a new furnace and the ductless MSHP cases. These measures are cost-effective On-Bill with PGE for the DFHP with an existing furnace and ducted MSHP measures. Climate Zone 16 provides an example of HPSH cost-effectiveness in a cold climate where almost all HPSH measures are cost effective based on LSC but not cost-effective On-Bill.

Table 11. HPSH CZ 12 [1992-2010]
Measure
First
Incremental
Cost
2025 LSC
NPV

PGE SMUD
First-year
Utility
Savings
On-Bill
NPV
First-year
Utility
Savings
On-Bill
NPV
DFHP Existing Furnace $1,960 $7,093 ($19) $1,633 $247 $7,693 DFHP New Furnace $4,023 $3,915 ($34) ($3,134) $234 $2,979 HPSH (Std Efficiency) $1,172 $6,990 ($147) ($2,151) $246 $6,812 HPSH (High Efficiency) $4,149 $5,366 $13 ($3,368) $300 $3,160 Ducted MSHP $1,421 $9,136 $10 $378 $298 $6,951
Ductless MSHP (Std Efficiency) $13,336 ($9,175) $30 ($18,039) $276 ($12,428) Ductless MSHP (High Efficiency) $17,266 ($6,753) $409 ($15,853) $423 ($15,532) HPSH + PV $10,780 $5,289 $452 ($59) $885 $9,821
Table 12. HPSH CZ 16 [1992-2010]
Measure
First
Incremental
Cost
2025 LSC
NPV
PGE
First-year
Utility Savings On-Bill NPV
DFHP Existing Furnace $2,397 $7,289 ($116) ($1,891)
DFHP New Furnace $4,757 $2,457 ($133) ($6,322)
HPSH (Std Efficiency) $2,725 $11,142 ($480) ($8,532)
HPSH (High Efficiency) $5,701 $12,099 ($204) ($7,125)
Ducted MSHP $2,155 $16,554 ($221) ($2,853)
Ductless MSHP (Std Efficiency) $13,336 ($134) ($170) ($19,742) Ductless MSHP (High Efficiency) $17,266 $9,397 $539 ($10,031) HPSH + PV $12,333 $10,640 $316 ($1,949)
174
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 27 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25

3.2.2 HPWH Cost-Effectiveness
Cost-effectiveness of heat pump water heating measures for Climate Zones 12 and 16 is summarized in Table 13 and Table 14 below. This sensitivity study looks at a wider range of HPWH tank locations and whether or not the unit has ducting for supply and exhaust air. All the HPWH measures in Climate Zones 12 and 16 are cost effective based on LSC.

Table 13. HPWH CZ 12 [1992-2010]
Measure
First
Incremental
Cost
2025 LSC
NPV

PGE SMUD
First-Year
Utility
Savings
On-Bill
NPV
First-Year
Utility
Savings
On-Bill
NPV
240V Fed. Min. HPWH $4,332 $3,536 ($213) ($8,738) $191 $477 240V Market Std. NEEA
HPWH $5,193 $4,304 ($82) ($7,164) $230 ($56)
240V Market Std. NEEA
HPWH + DR $5,193 $5,536 ($21) ($5,773) $248 $362
120V Market Std. NEEA
HPWH $2,893 $9,730 ($2) ($1,651) $254 $4,203
240V Fed. Min. HPWH
(Exterior Closet) $4,751 $2,834 ($224) ($9,431) $186 ($78) 240V Fed. Min. HPWH
(Interior Closet) $4,413 $3,123 ($71) ($6,138) $188 ($235) 240V Fed. Min. HPWH
(Interior Closet, ducted) $5,492 $3,359 ($202) ($9,505) $205 ($231) 240V Fed. Min. HPWH + PV $13,940 $3,567 $577 ($2,300) $831 $3,486 Table 14. HPWH CZ 16 [1992-2010]
Measure
First
Incremental
Cost
2025 LSC
NPV
PGE
First-Year Utility
Savings On-Bill NPV
240V Fed. Min. HPWH $4,332 $4,186 ($250) ($9,307)
240V Market Std. NEEA HPWH $5,193 $4,088 ($160) ($8,652) 240V Market Std. NEEA HPWH + DR $5,193 $5,653 ($79) ($6,804 120V Market Std. NEEA HPWH $2,893 $10,646 ($13) ($1,602) 240V Fed. Min. HPWH (Exterior Closet) $4,751 $3,317 ($268) ($10,154) 240V Fed. Min. HPWH (Interior Closet) $4,413 $5,004 ($18) ($4,690) 240V Fed. Min. HPWH (Interior Closet,
ducted) $5,492 $4,857 ($202) ($9,174)
240V Fed. Min. HPWH + PV $13,940 $5,049 $620 ($1,043)
175
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 28 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25

3.2.3 Envelope & Duct Improvement Cost-Effectiveness
Cost-effectiveness of envelope and duct measures for Climate Zones 3, 10, and 12 is summarized in Table 15 through Table 17.

Table 15. Envelope and Duct Measures CZ 3 [Pre-1978]
Measure
First
Incremental
Cost
2025 LSC
NPV
PG&E
First-year Utility
Savings On-Bill NPV
R-6 Ducts $4,808 $2,851 $188 $463
R-8 Ducts $6,311 $1,747 $198 ($776)
10% Duct Sealing $2,590 $1,956 $104 $397
R-13 Wall Insulation $2,950 $3,476 $144 $1,221
R-38 Attic Insulation $6,762 ($1,567) $127 ($3,178)
R-49 Attic Insulation $7,446 ($1,768) $139 ($3,520)
R-30 Raised Floor Insulation $4,113 $9,008 $224 $2,975
Cool Roof (0.20 Ref) $893 ($2,419) ($18) ($1,811)
Table 16. Envelope and Duct Measures CZ 10 [Pre-1978]
Measure
First
Incremental
Cost
2025 LSC
NPV

SCE/SCG SDGE
First-year
Utility
Savings
On-Bill
NPV
Firstyear
Utility
Savings
On-Bill
NPV
R-6 Ducts $4,808 $7,463 $783 $13,168 $1,100 $22,155
R-8 Ducts $6,311 $6,326 $800 $12,076 $1,125 $21,268
10% Duct Sealing $2,590 $3,438 $370 $5,969 $518 $10,166 R-13 Wall Insulation $2,950 $1,795 $179 $1,476 $250 $3,494 R-38 Attic Insulation $6,762 $664 $416 $2,951 $582 $7,654 R-49 Attic Insulation $7,446 $796 $467 $3,435 $655 $8.756 R-30 Raised Floor Insulation $4,113 ($999) ($29) ($4,235) ($46) ($4,687) Cool Roof (0.20 Ref) $893 $428 $174 $2,647 $246 $4,656
Table 17. Envelope and Duct Measures CZ 12 [Pre-1978]
Measure
First
Incremental
Cost
2025 LSC
NPV

PG&E SMUD
First-year
Utility
Savings
On-Bill
NPV
Firstyear
Utility
Savings
On-Bill
NPV
R-6 Ducts $4,808 $11,609 $804 $14,727 $413 $5,816
R-8 Ducts $6,311 $10,722 $828 $13,849 $427 $4,711
10% Duct Sealing $2,590 $6,418 $397 $7,280 $222 $3,281
R-13 Wall Insulation $2,950 $5,774 $262 $4,054 $187 $2,342 R-38 Attic Insulation $6,762 $3,727 $499 $5,461 $261 $19 R-49 Attic Insulation $7,446 $4,092 $552 $6,063 $288 $33 R-30 Raised Floor Insulation $4,113 $5,245 $27 ($1,176) $156 $1,175 Cool Roof (0.20 Ref) $893 ($354) $154 $2,123 $44 ($386) 176
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 29 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25

3.2.4 Sensitivities
Table 18 shows the On-Bill NPV results of Climate Zone 12 with PG&E utility rates and the impacts of escalation rates, and CARE rates. The “Standard Results” in Table 18 assumes the escalation rates used in the analysis presented elsewhere in this report. Table 19 shows the impact of electrical panel upgrades. The “Standard Results” in Table 19 does not assume a panel upgrade is required.

Table 18. Sensitivity Analysis Results for On-Bill NPV Cost-Effectiveness in Climate Zone 12, PG&E Measure Vintage Standard
Results
2025 LSC
Escalation CARE
DFHP Existing Furnace 1992-2010 $1,063 $8,443 $1,884
DFHP New Furnace 1992-2010 ($6,770) $383 ($5,846)
HPSH (Std Efficiency) 1992-2010 ($2,151) $6,011 ($220)
HPSH (High Efficiency) 1992-2010 ($3,368) $4,987 ($2,721) Ducted MSHP 1992-2010 $378 $8,729 $1,057
Ductless MSHP (Std Efficiency) 1992-2010 ($18,039) ($10,732) ($17,623) Ductless MSHP (High Efficiency) 1992-2010 ($15,853) ($8,091) ($18,460) HPSH + PV 1992-2010 ($59) $8,822 ($1,255)
240V Fed. Min. HPWH 1992-2010 ($8,738) ($2,433) ($6,448) 240V Market Std. NEEA HPWH 1992-2010 ($7,164) ($694) ($5,918) 240V Market Std. NEEA HPWH + DR 1992-2010 ($5,773) $770 (5,014) 120V Market Std. NEEA HPWH 1992-2010 ($1,651) $4,930 (1,038) 240V Fed. Min. HPWH (Exterior Closet) 1992-2010 ($9,431) ($3,184) ($7,055) 240V Fed. Min. HPWH (Interior Closet) 1992-2010 ($6,138) ($1,000) ($5,098) 240V Fed. Min. HPWH (Interior Closet, ducted) 1992-2010 ($9,505) ($2,836) ($7,271) 240V Fed. Min. HPWH + PV 1992-2010 ($2,300) $4,952 ($4,858) R-6 Ducts Pre-1978 $14,727 $18,685 $8,592
R-8 Ducts Pre-1978 $13,849 $17,990 $7,532
10% Duct Sealing Pre-1978 $7,280 $9,752 $4,294
R-13 Wall Insulation Pre-1978 $4,054 $6,898 $2,196
R-38 Attic Insulation Pre-1978 $5,461 $8,126 $1,668
R-49 Attic Insulation Pre-1978 $6,063 $8,978 $1,864
R-30 Raised Floor Insulation Pre-1978 ($1,776) $2,468 ($1,602) Cool Roof (0.20 Ref) Pre-1978 $2,123 $1,848 $851
Table 19. Electric Panel Upgrade Sensitivity for CZ 12 [1992-2010] Measure Standard Results Electric Panel Upgrade
On-Bill NPV LSC NPV On-Bill NPV LSC NPV
HPSH (Std Efficiency) ($2,151) $6,990 ($4,931) $4,210
240V Fed. Min. HPWH ($8,738) $3,536 ($11,624) $756
177
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 30 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25

3.3 Gas Pathways for Heat Pump Replacements
Many jurisdictions are exploring policy options to accelerate the decarbonization of existing homes. A recent Ninth Circuit Court ruling in California Rest. Ass'n v. City of Berkeley20 invalidated Berkeley’s ordinance banning the installation of gas infrastructure in new construction. The ruling stated that the ordinance effectively banned covered products and was preempted by the Energy Policy and Conservation Act (“EPCA”), 42 U.S.C. § 6297(c). Given the possible impacts of that ruling, the Reach Codes Team analyzed policy options targeting equipment replacements that allow for the installation of either electric or gas-fueled equipment. These packages include gas equipment combined with additional efficiency measures resulting in options that are reasonably energy or LSC cost equivalent, to the extent feasible.

For space heating, the heat pump path is a DFHP (existing furnace).. The gas pathway is a new air conditioner with the following list of efficiency upgrades:
• 400 cfm/ton system airflow (HERS verified).
• 0.35 W/cfm fan efficacy (HERS verified).
• Refrigerant charge verification (HERS verified).
• R-8 ducts, 5% leakage (HERS verified).
• R-49 (from R-30) attic insulation.
• Air sealing of the ceiling from 7 to 6.5 ACH50.

The two pathways are presented in Figure 14 comparing total LSC energy use relative to the existing home for the 1992-2010 vintage. In most climate zones, the DFHP (existing furnace) path results in higher energy savings, in the milder climates the air conditioner path saves marginally more energy. A reach code that establishes requirements when an air conditioner is replaced or installed new, could allow for either a heat pump to be installed or an air conditioner as long as the performance measures listed above are met. Note that in this analysis a DFHP (existing furnace) was used; however, a reach code could require a different heat pump measure for the heat pump path. This approach aligns with the CEC’s proposal for the 2025 Title 24 code cycle for heat pump alterations in single family homes (California Energy Commission, 2023).
20 California Rest. Ass'n v. City of Berkeley, 65 F.4th 1045 (9th Cir. 2023) amended by 89 F.4th 1094 (9th Cir. 2024). 178
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 31 Results
California Energy Codes & Standards | A statewide utility program 2024-04-25 Figure 14. Heat pump space heater path compared to the air conditioner path.

For water heating, the federal minimum HPWH case was used to develop the package. The HPWH was compared to a new gas storage water heater with a 50% solar thermal backup system.

The two pathways are presented in Figure 15 comparing total LSC energy use relative to the existing home for the 1992-2010 vintage. In all climate zones, the heat pump path results in higher energy savings than the gas path. A reach code that establishes requirements when a water heater is replaced could allow for either a HPWH to be installed or a gas water heater in combination with a solar thermal system that meets the solar fraction requirements listed above.

Figure 15. Heat pump water path compared to gas with solar thermal. 179
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 32 Recommendations and Discussion
California Energy Codes & Standards | A statewide utility program 2024-04-25 4 Recommendations and Discussion
This analysis evaluated the feasibility and cost-effectiveness of retrofit measures in California existing homes built before 2010. The Statewide Reach Codes Team used both On-Bill and LSC-based LCC approaches to evaluate costeffectiveness and quantify the energy cost savings associated with energy efficiency measures compared to the incremental costs associated with the measures.

Conclusions and Discussion:

1. Envelope measures. Improving envelope performance is very cost-effective in many older homes. In addition to reducing utility costs these measures provide many other benefits such as improving occupant comfort and satisfaction and increasing a home’s ability to maintain temperatures during extreme weather events and power outages. Below is a discussion of the results of specific measures. a. Adding attic insulation is cost effective based on both LSC and On-Bill in many climate zones in homes with no more than R-19 existing attic insulation levels. Increasing attic insulation from R-30 to R-49 was still found to be cost-effective based on at least one metric in the colder and hotter climates of Climate Zone 10 (SDG&E territory only) through 16.
b. Insulating existing uninsulated walls is very cost-effective based on both metrics everywhere except Climate Zones 6 and 7 (in Climate Zone 8 it’s only cost-effective based on LSC). c. Adding R-19 or R-30 floor insulation is cost-effective based on LSC in the older two vintages (Pre-1978 and 1978-1991) in all climate zones except Climate Zones 6-10. d. Replacing old single pane windows with new high-performance windows has a very high cost and is typically not done for energy savings alone. However, energy savings are substantial and justify costeffectiveness of this measure based on at least one metric in Climate Zones 4, 8 through 12 (PG&E territory only), and 13 through 16.
e. At time of roof replacement, a cool roof with an aged solar reflectance of 0.25 was found to be costeffective in Climate Zones 4, 6 through 12 (PG&E territory only), and 13 through 15. When the roof deck is replaced during a roof replacement, adding a radiant barrier is low cost and provides substantial cooling energy savings to be cost-effective in almost all climate zones and homes.

2. Duct measures: Many older homes have old, leaky duct systems that should be replaced when they reach the end of life, typically 20-30 years. In this case, installing new ducts was found to be cost-effective based on at least one metric (both in most cases) everywhere except mild Climate Zone 7 and Climate Zones 5 and 6 in the 1978-1991 vintage. If duct systems still have remaining life they should be sealed and tested to meet 10% leakage or lower; however, duct upgrades alone were only found to be cost-effective for newer homes in Climate Zones 10 (SDG&E territory only), 11, and 13 through 16. Duct upgrades may be able to be coupled with other measures to reduce the cost.

3. Heat pump space heating: HPSHs were found to be LSC cost-effective in many cases. The DFHP (existing furnace) was LSC cost-effective everywhere except Climate Zone 15. The HPSH was LSC cost-effective everywhere except Climate Zones 8 and 15.
a. Challenges to On-Bill cost-effectiveness include higher first costs and higher first-year utility costs due to higher electricity tariffs relative to gas tariffs. SMUD and CPAU are two exceptions where first year utility costs are lower for heat pumps than for gas equipment. Table 11 shows the impact of utility rates on cost-effectiveness of HPSH where the standard and high efficiency HPSH and the HPSH + PV measures are cost-effective under SMUD but not PG&E. Even with higher first year utility bills, there were some cases that still proved On-Bill cost-effective including the DFHP with an existing furnace in the central valley and northern coastal PG&E territories, the ducted MSHP in the central valley as well as Climate Zone 14 in SDG&E territory, and the HPSH + PV measure in CZ 3-5 (PGE), 7-11, and 12 (SMUD) – 15.
b. The ductless MSHPs, evaluated for homes with existing ductless systems, were only found to be costeffective based on either metric in Climate Zones 1 and 16. Ductless MSHPs have a high incremental cost because it is a more sophisticated system than the base model of a wall furnace with a window AC unit. However, the ductless MSHP would provide greater comfort benefits if properly installed to 180
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 33 Recommendations and Discussion
California Energy Codes & Standards | A statewide utility program 2024-04-25 directly condition all habitable spaces (as is required under the VCHP compliance credit as evaluated in this study) which may be an incentive for a homeowner to upgrade their system. c. Higher efficiency equipment lowered utility costs in all cases and improved cost-effectiveness in many cases, particularly with a ducted MSHP.

4. Heat pump water heating: All the HPWH measures were LSC cost-effective in all climate zones. Most measures were not On-Bill cost-effective with the exception of the HPWH + PV which was cost-effective OnBill in CPAU, SMUD, and SDG&E territories in addition to Climate Zones 11, 13, 14, and 15. The HPWH measures share many of the same challenges as the HPSH measures to achieving cost-effectiveness including high first costs and utility rates and assumptions. Table 13 shows the impact of utility rates on costeffectiveness where some HPWH measures are cost-effective under SMUD utility rates but are not costeffective anywhere under PG&E rates in Climate Zone 12. a. Various HPWH locations were also explored, however there are some factors outside of costeffectiveness that should also be considered. i. HPWHs in the conditioned space can provide benefits such as free cooling during the summer, reduced tank losses, and shorter pipe lengths, and in some cases show improved cost-effectiveness over garage located HPWHs. However, there are various design considerations such as noise, comfort concerns, and condensate removal. Ducting the inlet and exhaust air resolves comfort concerns but adds costs and complexity. Split heat pump water heaters address these concerns, but currently there are limited products on the market and there is a cost premium relative to the packaged products. ii. Since HPWHs extract heat from the air and transfer it to water in the storage tank, they must have adequate ventilation to operate properly. Otherwise, the space cools down over time, impacting the HPWH operating efficiency. This is not a problem with garage installations but needs to be considered for water heaters located in interior or exterior closets. For the 2025 Title 24 code the CEC is proposing that all HPWH installations meet mandatory ventilation requirements (California Energy Commission, 2023).

5. The contractor surveys revealed overall higher heat pump costs than what has been found in previous analyses. This could be due to incentive availability raising demand for heat pumps and thereby increasing the price. This price increase may be temporary and may come down once the market stabilizes. There are also new initiatives to obtain current costs including the TECH Clean California program21 that publishes heat pump data and costs; however, at the time of this analysis, the TECH data did not contain incremental costs because it only had the heat pump costs but not the gas base case costs.

6. Table 18 shows how CARE rates and escalation rate assumptions will impact cost-effectiveness. a. Applying CARE rates in the IOU territories has the overall impact to increase utility cost savings for an all-electric building compared to a code compliant mixed fuel building, improving On-Bill costeffectiveness. This is due to the CARE discount on electricity being higher than that on gas. The reverse occurs with efficiency measures where lower utility rates reduce savings and subsequently reduce cost-effectiveness.
b. If gas tariffs are assumed to increase substantially over time, in-line with the escalation assumption from the 2025 LSC development, cost-effectiveness substantially improves for the heat pump measures over the 30-year analysis period and many cases become cost-effective that were not found to be cost-effective under the CPUC / 2022 TDV escalation scenario. There is much uncertainty surrounding future tariff structures as well as escalation values. While it’s clear that gas rates will increase, how much and how quickly is not known. Future electricity tariff structures are expected to evolve over time, and the CPUC has an active proceeding to adopt an income-graduated fixed charge that benefits low-income customers and supports electrification measures for all customers.22 The CPUC will decide in mid-2024 and the new rates are expected to be in place later that year or in 2025. 21 TECH Public Reporting Home Page (techcleanca.com)
22 https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electric-costs/demand-response-dr/demandflexibility-rulemaking 181
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 34 Recommendations and Discussion
California Energy Codes & Standards | A statewide utility program 2024-04-25 While the anticipated impact of this rate change is lower volumetric electricity rates, the rate design is not finalized. While lower volumetric electricity rates provide many benefits, it also will make building efficiency measures harder to justify as cost-effective due to lower utility bill cost savings.

7. Under NBT, utility cost savings for PV are substantially less than what they were under prior net energy metering rules (NEM 2.0); however, savings are sufficient to be On-Bill cost-effective in all climate zones except Climate Zones 1 through 3 and 5 through 6.
a. Combining a heat pump with PV allows the additional electricity required by the heat pump to be offset by the PV system while also increasing on-site utilization of PV generation rather than exporting the electricity back to the grid at a low rate.
b. While not evaluated in this study, coupling PV with battery systems can be very advantageous under NBT increasing utility cost savings because of improved on-site utilization of PV generation and fewer exports to the grid.

Recommendations:

1. There are various approaches for jurisdictions who are interested in reach codes for existing buildings. Some potential approaches are listed below along with key considerations. a. Prescriptive measures: Non-preempted measures that are found to be cost-effective may be prescriptively required in a reach code. One example of this type or ordinance is a cool roof requirement at time of roof replacement. Another example is requiring specific cost-effective measures for larger remodels, such as high-performance windows when new windows are installed or duct sealing and testing where ducts are in unconditioned space. b. Replacement equipment: This flavor of reach code sets certain requirements at time of equipment replacement. This study evaluated space heating and water heating equipment. Where a heat pump measure was found to be cost-effective based on either LSC or On-Bill, this may serve as the basis of a reach code given the following considerations.
i. Where reach codes reduce energy usage and are not just fuel switching, cost-effectiveness calculations are required and must be based on equipment that does not exceed the federal minimum efficiency requirements.
ii. Where reach codes are established using cost-effectiveness based on LSC, utility bill impacts and the owner’s first cost should also be reviewed and considered. iii. A gas path should also be prescriptively allowed to safely satisfy federal preemption requirements considering the CRA v. Berkeley case.23 Additional requirements may apply to the gas path, as described in Section 3.3, as long as the paths are reasonably energy or cost equivalent.
c. “Flexible Path”, minimum energy savings target: This flexible approach establishes a target for required energy savings based on a measure or a set of measures that were found to be cost-effective based on either LSC or On-Bill. A points menu compares various potential upgrades ranging from efficiency, PV, and fuel substitution measures, based on site or source energy savings. The applicant must select upgrades that individually or in combination meet the minimum energy savings target. The measures used to set the target should be non-preempted measures.

2. Equipment replacement ordinances should consider appropriate exceptions for scenarios where it will be challenging to meet the requirements, such as location of the HPWH, total project cost limitations, or the need for service panel upgrades that wouldn’t have been required as part of the proposed scope of work in absence of the reach code.

3. Consider extending relevant proposals made by the CEC for the 2025 Title 24 code (California Energy Commission, 2023) in ordinances that apply under the 2022 Title 24 code, such as the following:
a. Mandatory ventilation requirements for HPWH installations (Section 110.3(c)7). 23 https://www.publichealthlawcenter.org/sites/default/files/2024-01/CRA-v-Berkeley-Ninth-Circuit-Opinion-Jan2024.pdf 182
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 35 Recommendations and Discussion
California Energy Codes & Standards | A statewide utility program 2024-04-25 b. Requirement for HERS verified refrigerant charge verification for heat pumps in all climate zones (Table 150.1-A24).

4. When evaluating reach code strategies, the Reach Codes Team recommends that jurisdictions consider combined benefits of energy efficiency alongside electrification. Efficiency and electrification have symbiotic benefits and are both critical for decarbonization of buildings. As demand on the electric grid is increased through electrification, efficiency can reduce the negative impacts of additional electricity demand on the grid, reducing the need for increased generation and storage capacity, as well as the need to upgrade upstream transmission and distribution equipment.

5. Education and training can play a critical role in ensuring that heat pumps are installed, commissioned, and controlled properly to mitigate grid impacts and maximize occupant satisfaction. Below are select recommended strategies.
a. The Quality Residential HVAC Services Program25 is an incentive program to train California contractors in providing quality installation and maintenance while advancing energy-efficient technologies in the residential HVAC industry. Jurisdictions can market this to local contractors to increase the penetration of contractors skilled in heat pump design and installation. b. Educate residents and contractors of available incentives, tax credits, and financing opportunities. c. Educate contractors on code requirements. Energy Code Ace provides free tools, trainings, and resource to help Californians comply with the energy code. Contractors can access interactive compliance forms, fact sheets, and live and recorded trainings, among other things, on the website:
https://energycodeace.com/. Jurisdictions can reach out to Energy Code Ace directly to discuss offerings.

6. Health and safety
a. Combustion Appliance Safety and Indoor Air Quality: Implementation of some of the recommended measures will affect the pressure balance of the home which can subsequently impact the safe operation of existing combustion appliances as well as indoor air quality. Buildings with older gas appliances can present serious health and safety problems which may not be addressed in a remodel if the appliances are not being replaced. It is recommended that the building department require inspection and testing of all combustion appliances located within the pressure boundary of the building after completion of retrofit work that involves air sealing or insulation measures. b. Jurisdictions may consider requiring mechanical ventilation in homes where air sealing has been conducted. In older buildings, outdoor air is typically introduced through leaks in the building envelope.

After air sealing a building, it may be necessary to forcefully bring in fresh outdoor air using supply and/or exhaust fans to minimize potential issues associated with indoor air quality. 24 This requirement does not show up in the Express Terms for alterations in Section 150.2(b)1F, but the Statewide Reach Codes Team expects that it will be added to the next release of the proposed code language in the 45-day language as it aligns with the proposal made by the Codes and Standards Enhancement Team (Statewide CASE Team, 2023). 25 https://qualityhvac.frontierenergy.com/ 183
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 36 References
California Energy Codes & Standards | A statewide utility program 2024-04-25 5 References
California Energy Commission. (2017). Rooftop Solar PV System. Measure number: 2019-Res-PV-D Prepared by Energy and Environmental Economics, Inc. Retrieved from https://efiling.energy.ca.gov/getdocument.aspx?tn=221366 California Energy Commission. (2021b). Final Express Terms for the Proposed Revisions to the 2022 Energy Code Reference Appendices. Retrieved from https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=21- BSTD-01
California Energy Commission. (2022b). 2022 Reference Appendices for the 202 Building Energy Efficiency Standards.

CEC-400-2022-010-AP. Retrieved from https://www.energy.ca.gov/sites/default/files/2022-08/CEC-400- 2022-010-AP.pdf
California Energy Commission. (2022c, Feb). 2022 Single-Family Residential Alternative Calculation Method Reference Manual. CEC-400-2022-008-CMF-REV. Retrieved from https://www.energy.ca.gov/publications/2022/2022- single-family-residential-alternative-calculation-method-reference-manual California Energy Commission. (2023). 2025 Energy code Hourly Factors. Retrieved from https://www.energy.ca.gov/files/2025-energy-code-hourly-factors California Energy Commission. (2023). Draft 2025 Energy Code Express Terms. Retrieved from https://efiling.energy.ca.gov/GetDocument.aspx?tn=252915&DocumentContentId=88051 California Public Utilities Commission. (2021a). Utility Costs and Affordability of the Grid of the Future: An Evaluation of Electric Costs, Rates, and Equity Issues Pursuant to P.U. Code Section 913.1. Retrieved from https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/office-of-governmental-affairsdivision/reports/2021/senate-bill-695-report-2021-and-en-banc-whitepaper_final_04302021.pdf California Public Utilities Commission. (2021b). Database for Energy-Efficient resources (DEER2021 Update). Retrieved April 13, 2021, from http://www.deeresources.com/index.php/deer-versions/deer2021 Department of Energy. (2022). Preliminary Analysis Technical Support Document: Energy Efficiency Program for Consumer Products and Commercial and Industrial Equipment. Retrieved from https://www.regulations.gov/document/EERE-2017-BT-STD-0019-0018 Department of Energy. (2023). Technical Support Document: Energy Efficiency Program for Consumer Products and Commercial and Industrial Equipment: Room Air Conditioners. Retrieved from https://www.regulations.gov/document/EERE-2014-BT-STD-0059-0053 E-CFR. (2020). https://www.ecfr.gov/cgibin/retrieveECFR?gp=&SID=8de751f141aaa1c1c9833b36156faf67&mc=true&n=pt10.3.431&r=PART&ty=HTM L#se10.3.431_197. Retrieved from Electronic Code of Federal Regulations: https://www.ecfr.gov/cgibin/retrieveECFR?gp=&SID=8de751f141aaa1c1c9833b36156faf67&mc=true&n=pt10.3.431&r=PART&ty=HTM L#se10.3.431_197
Statewide CASE Team. (2023). Residential HVAC Performance. Codes and Standards Enhancement (CASE) Initiative 2025 California Energy Code. Prepared by Frontier Energy. Retrieved from https://title24stakeholders.com/wp-content/uploads/2023/11/Revised_2025_T24_Final-CASE-Report-RESHVAC-Performance.pdf Statewide Reach Codes. (2023). Cost Effectiveness Explorer. Retrieved from Cost Effectiveness Explorer:
https://explorer.localenergycodes.com/
Statewide Reach Codes Team. (2021). 2019 Cost-Effectiveness Study: Existing Single Family Residential Buidling Upgrades. Retrieved from https://localenergycodes.com/content/resources 184
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 37 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 6 Appendices

6.1 Map of California Climate Zones
Climate zone geographical boundaries are depicted in Figure 16. The map in Figure 16 along with a zip-code search directory is available at: https://ww2.energy.ca.gov/maps/renewable/building_climate_zones.html Figure 16. Map of California climate zones.
185
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 38 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2 Utility Rate Schedules
The Reach Codes Team used the CA IOU and POU rate tariffs detailed below to determine the On-Bill savings for each package. The California Climate Credit was applied for both electricity and natural gas service for the IOUs using the 2023 credits shows below.26 The credits were applied to reduce the total calculated annual bill, including any fixed fees or minimum bill amounts.

Electricity rates reflect the most recently approved tariffs. Monthly gas rates were estimated based on recent gas rates (November 2023) and a curve to reflect how natural gas prices fluctuate with seasonal supply and demand. The seasonal curve was estimated from monthly residential tariffs between 2014 and 2023 (between 2017 and 2023 for CPAU). 12-month curves were created from monthly gas rates for each of the ten years (Seven years for CPAU).

These annual curves were then averaged to arrive at an average normalized annual curve. This was conducted separately for baseline and excess energy rates. Costs used in this analysis were then derived by establishing the most recent baseline and excess rate from the latest tariff as a reference point (November 2023), and then using the normalized curve to estimate the cost for the remaining months relative to the reference point rate. 26 https://www.cpuc.ca.gov/industries-and-topics/natural-gas/greenhouse-gas-cap-and-trade-program/californiaclimate-credit 186
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 39 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2.1 Pacific Gas & Electric
The following pages provide details on the PG&E electricity and natural gas tariffs applied in this study. Table 20 describes the baseline territories that were assumed for each climate zone. A net surplus compensation rate of $0.07051/ kWh was applied to any net annual electricity generation based on a one-year average of the rates between December 2022 and November 2023.

Table 20. PG&E Baseline Territory by Climate Zone
Climate
Zone
Baseline
Territory
CZ01 V
CZ02 X
CZ03 T
CZ04 X
CZ05 T
CZ11 R
CZ12 S
CZ13 R
CZ16 Y
The PG&E monthly gas rate in $/therm was applied on a monthly basis according to the rates shown in Table 21.

These rates are based on applying a normalization curve to the November 2023 tariff based on ten years of historical gas data. Corresponding CARE rates reflect the 20 percent discount per the GL-1 tariff.

Table 21. PG&E Monthly Gas Rate ($/therm)
Month Total Charge
Baseline Excess
January $2.05 $2.43
February $2.08 $2.46
March $1.92 $2.31
April $1.80 $2.20
May $1.77 $2.18
June $1.78 $2.18
July $1.80 $2.20
August $1.85 $2.26
September $1.92 $2.33
October $1.99 $2.40
November $2.06 $2.46
December $2.05 $2.44
187
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 40 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 188 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 41 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 189 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 42 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 190 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 43 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 191 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 44 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 192 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 45 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 193 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 46 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 194 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 47 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2.2 Southern California Edison
The following pages provide details on the SCE electricity tariffs applied in this study. Table 22 describes the baseline territories that were assumed for each climate zone. A net surplus compensation rate of $ 0.06030/ kWh was applied to any net annual electricity generation based on a one-year average of the rates between December 2022 and November 2023
Table 22: SCE Baseline Territory by Climate Zone
Climate
Zone
Baseline
Territory
CZ06 6
CZ08 8
CZ09 9
CZ10 10
CZ14 14
CZ15 15
195
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 48 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 196 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 49 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 197 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 50 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 198 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 51 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2.3 Southern California Gas
Following are the SoCalGas natural gas tariffs applied in this study. Table 23 describes the baseline territories that were assumed for each climate zone.

Table 23. SoCalGas Baseline Territory by Climate Zone
Climate
Zone
Baseline
Territory
CZ05 2
CZ06 1
CZ08 1
CZ09 1
CZ10 1
CZ14 2
CZ15 1
The SoCalGas monthly gas rate in $/therm was applied on a monthly basis according to the rates shown in Table 24.

These rates are based on applying a normalization curve to the November 2023 tariff based on ten years of historical gas data. Long-term historical natural gas rate data was only available for SoCalGas’ procurement charges.27 The baseline and excess transmission charges were found to be consistent over the course of a year and applied for the entire year based on 2023 rates. CARE rates reflect the 20 percent discount per the GR tariff.

Table 24. SoCalGas Monthly Gas Rate ($/therm)
Month Procurement
Charge
Transportation Charge Total Charge
Baseline Excess Baseline Excess
January $0.72 $0.86 $1.31 $1.92 $2.36
February $0.50 $0.86 $1.31 $1.57 $2.02
March $0.44 $0.86 $1.31 $1.48 $1.93
April $0.39 $0.86 $1.31 $1.39 $1.84
May $0.41 $0.86 $1.31 $1.43 $1.87
June $0.46 $0.86 $1.31 $1.49 $1.93
July $0.47 $0.86 $1.31 $1.51 $1.96
August $0.51 $0.86 $1.31 $1.58 $2.03
September $0.46 $0.86 $1.31 $1.52 $1.96
October $0.45 $0.86 $1.31 $1.48 $1.92
November $0.48 $0.86 $1.31 $1.54 $1.99
December $0.57 $0.86 $1.31 $1.63 $2.08
27 The SoCalGas procurement and transmission charges were obtained from the following site:
https://www.socalgas.com/for-your-business/energy-market-services/gas-prices RES2023.xlsx (live.com)
199
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 52 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 200 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 53 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2.4 San Diego Gas & Electric
Following are the SDG&E electricity and natural gas tariffs applied in this study. Table 25 describes the baseline territories that were assumed for each climate zone. A net surplus compensation rate of $0.04542/ kWh was applied to any net annual electricity generation based on a one-year average of the rates between December 2022 and November 2023.

Table 25. SDG&E Baseline Territory by Climate Zone
Climate
Zone
Baseline
Territory
CZ07 Coastal
CZ10 Inland
CZ14 Mountain
The SDG&E monthly gas rate in $/therm was applied on a monthly basis according to the rates shown in Table

26. These rates are based on applying a normalization curve to the November 2023 tariff based on ten years of historical gas data. CARE rates reflect the 20 percent discount per the G-CARE tariff.

Table 26. SDG&E Monthly Gas Rate ($/therm)
Month Total Charge
Baseline Excess
January $2.34 $2.63
February $2.28 $2.57
March $2.21 $2.51
April $2.14 $2.45
May $2.18 $2.48
June $2.23 $2.55
July $2.26 $2.57
August $2.32 $2.62
September $2.26 $2.59
October $2.21 $2.55
November $2.24 $2.57
December $2.38 $2.70
201
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 54 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 202 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 55 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 203 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 56 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 204 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 57 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 205 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 58 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 206 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 59 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 207 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 60 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 208 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 61 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 209 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 62 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 210 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 63 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2.5 City of Palo Alto Utilities
Following are the CPAU electricity and natural gas tariffs applied in this study. The CPAU monthly gas rate in $/therm was applied on a monthly basis according to the rates shown in Table 27. These rates are based on applying a normalization curve to the October 2023 tariff based on seven years of historical gas data. The monthly service charge applied was $14.01 per month per the November 2023 G-1 tariff.

Table 27. CPAU Monthly Gas Rate ($/therm)
Month G1 Volumetric
Total Baseline
G1 Volumetric
Total Excess
January $1.83532 $3.35639
February $1.38055 $2.59947
March $1.32506 $2.47695
April $1.29680 $2.44038
May $1.29511 $2.43804
June $1.32034 $2.45406
July $1.35688 $2.61519
August $1.40696 $2.67944
September $1.42130 $2.70301
October $1.42310 $2.48300
November $1.46286 $2.45547
December $1.62415 $2.62128
211
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 64 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 212 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 65 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2.6 Sacramento Municipal Utilities District (Electric Only) Following are the SMUD electricity tariffs applied in this study. The rates effective January 2023 were used. 213
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 66 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 214 Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 67 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25

6.2.7 Fuel Escalation Assumptions
The average annual escalation rates in Table 28 were used in this study. These are based on assumptions from the CPUC 2021 En Banc hearings on utility costs through 2030 (California Public Utilities Commission, 2021a). Escalation rates through the remainder of the 30-year evaluation period are based on the escalation rate assumptions within the 2022 TDV factors. No data was available to estimate electricity escalation rates for CPAU and SMUD, therefore electricity escalation rates for PG&E and statewide natural gas escalation rates were applied. Table 29 presents the average annual escalation rates used in the utility rate escalation sensitivity analysis shown in Section 3.2.4. Rates were applied for the same 30-year period and are based on the escalation rate assumptions within the 2025 LSC factors from 2027 through 2053.28 These rates were developed for electricity use statewide (not utility-specific) and assume steep increases in gas rates in the latter half of the analysis period. Data was not available for the years 2024, 2025, and 2026 and so the CPUC En Banc assumptions were applied for those years using the average rate across the three IOUs for statewide electricity escalation.

Table 28: Real Utility Rate Escalation Rate Assumptions, CPUC En Banc and 2022 TDV Basis
28https://www.energy.ca.gov/files/2025-energy-code-hourly-factors. Actual escalation factors were provided by consultants E3.

Statewide Natural
Gas Residential
Average Rate
(%/year, real)
Electric Residential Average Rate
(%/year, real)

PG&E SCE SDG&E
2024 4.6% 1.8% 1.6% 2.8%
2025 4.6% 1.8% 1.6% 2.8%
2026 4.6% 1.8% 1.6% 2.8%
2027 4.6% 1.8% 1.6% 2.8%
2028 4.6% 1.8% 1.6% 2.8%
2029 4.6% 1.8% 1.6% 2.8%
2030 4.6% 1.8% 1.6% 2.8%
2031 2.0% 0.6% 0.6% 0.6%
2032 2.4% 0.6% 0.6% 0.6%
2033 2.1% 0.6% 0.6% 0.6%
2034 1.9% 0.6% 0.6% 0.6%
2035 1.9% 0.6% 0.6% 0.6%
2036 1.8% 0.6% 0.6% 0.6%
2037 1.7% 0.6% 0.6% 0.6%
2038 1.6% 0.6% 0.6% 0.6%
2039 2.1% 0.6% 0.6% 0.6%
2040 1.6% 0.6% 0.6% 0.6%
2041 2.2% 0.6% 0.6% 0.6%
2042 2.2% 0.6% 0.6% 0.6%
2043 2.3% 0.6% 0.6% 0.6%
2044 2.4% 0.6% 0.6% 0.6%
2045 2.5% 0.6% 0.6% 0.6%
2046 1.5% 0.6% 0.6% 0.6%
2047 1.3% 0.6% 0.6% 0.6%
2048 1.6% 0.6% 0.6% 0.6%
2049 1.3% 0.6% 0.6% 0.6%
2050 1.5% 0.6% 0.6% 0.6%
2051 1.8% 0.6% 0.6% 0.6%
2052 1.8% 0.6% 0.6% 0.6%
2053 1.8% 0.6% 0.6% 0.6%
215
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 68 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 Table 29: Real Utility Rate Escalation Rate Assumptions, 2025 LSC Basis Year
Statewide Natural
Gas Residential
Average Rate
(%/year, real)
Statewide
Electricity
Residential
Average Rate
(%/year, real)
2024 4.6% 2.1%
2025 4.6% 2.1%
2026 4.6% 2.1%
2027 4.2% 0.6%
2028 3.2% 1.9%
2029 3.6% 1.6%
2030 6.6% 1.3%
2031 6.7% 1.0%
2032 7.7% 1.2%
2033 8.2% 1.1%
2034 8.2% 1.1%
2035 8.2% 0.9%
2036 8.2% 1.1%
2037 8.2% 1.1%
2038 8.2% 1.0%
2039 8.2% 1.1%
2040 8.2% 1.1%
2041 8.2% 1.1%
2042 8.2% 1.1%
2043 8.2% 1.1%
2044 8.2% 1.1%
2045 8.2% 1.1%
2046 8.2% 1.1%
2047 3.1% 1.1%
2048 -0.5% 1.1%
2049 -0.6% 1.1%
2050 -0.5% 1.1%
2051 -0.6% 1.1%
2052 -0.6% 1.1%
2053 -0.6% 1.1%
216
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 69 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 Get In Touch
The adoption of reach codes can differentiate jurisdictions as efficiency leaders and help accelerate the adoption of new equipment, technologies, code compliance, and energy savings strategies.

As part of the Statewide Codes & Standards Program, the Reach Codes Subprogram is a resource available to any local jurisdiction located throughout the state of California.

Our experts develop robust toolkits as well as provide specific technical assistance to local jurisdictions (cities and counties) considering adopting energy reach codes. These include Cost-effectiveness research and analysis, model ordinance language and other code development and implementation tools, and specific technical assistance throughout the code adoption process.

If you are interested in finding out more about local energy reach codes, the Reach Codes Team stands ready to assist jurisdictions at any stage of a reach code project.

Visit LocalEnergyCodes.com to
access our resources and sign up
for newsletters.

Contact [email protected]
for no-charge assistance from expert
Reach Code advisors
Follow us on LinkedIn
217
Cost-Effectiveness Analysis: Existing Single Family Building Upgrades 70 Appendices
California Energy Codes & Standards | A statewide utility program 2024-04-25 218
Outlook
Comment on Item 2.1 Green Building Requirements.

From McKitterick, Nate <[email protected]> Date Tue 9/9/2025 1:54 PM
To Town Council <[email protected]>
CAUTION: External Sender
Hello. I am Nate McKitterick, a Town resident. I was a Planning Commissioner for 12 years. I currently serve as a member of the Sierra Club Executive Committee, though I am not commenting in that role. I am sorry I can’t come tonight as I have a class.

First, I appreciate that the Town is being proactive on considering this change before the deadline, but also cautious about increasing effective costs of residential construction, particularly additions, ADUs, and new multifamily properties. The shortage of housing in Marin, necessitating commutes from North Marin and other counties in the Bay Area, is the #1 cause of greenhouse gas emissions in Marin, by far. Building costs are already so high that no new multifamily housing projects have broken ground in some time.

At least some of the Potential Cost Impacts are likely inaccurate for San Anselmo. Even a modest solar project, with no batteries, well-exceeds $20,000, not the $12,000-$20,000 range provided. I am about to get a quote on a air-water heat pump, but with retail plumbers going for $200+ an hour, I am pretty sure $4,000-$8,000 will prove light as well. That said, the 2025 Code, in the context of new single family home construction, may make sense, as these improvements will likely be done by most homeowners anyway either because they are required by other codes, or are popular. Those items include EV-ready wiring and heat pumps. So, the 2025 Code may not materially add to cost of new singlefamily home construction.

Regarding multifamily projects, I really can’t say whether 2025 vs 2022 will mean some projects do not go forward. I can say from one large multifamily project the Sierra Club reviewed in Corte Madera that a certain level of bike parking was difficult to make work, but we were supportive anyway. Would that, on top of other things the 2025 Code requires, made the project unprofitable? I have my doubts, but don’t know; I am concerned whether any of these projects will actually break ground unless interest rates drop or labor/materials costs moderate.

Regarding remodels of existing homes, I recommend you consider defining “substantial improvements to an existing single-family building” to a bright line of modifications to over 50% of the habitable square footage. It’s unclear to me what this standard means, otherwise. Cost-based standards are often draconian due to current construction costs.

I do expressly counsel rejection of expansion of projects to which the Code will apply. So, consistent with Staff’s recommendations, I recommend:
• You do not adopt a reduction of “Covered Projects” from 750 to 500 square feet. • You continue a broad exception for ADUs.

Thank you for your service!
-Nate
100 Alder Ave.

San Anselmo, CA 94960
650-787-7478
219
The information contained in this email may be confidential and/or legally privileged. It has been sent for the sole use of the intended recipient(s). If the reader of this message is not an intended recipient, you are hereby notified that any unauthorized review, use, disclosure, dissemination, distribution, or copying of this communication, or any of its contents, is strictly prohibited. If you have received this communication in error, please reply to the sender and destroy all copies of the message. To contact us directly, send to [email protected]. Thank you. 220
Item #: 3.1

STAFF REPORT
TOWN OF SAN ANSELMO Item #: 3.1
MEETING DATE: September 9, 2025
AGENDA TITLE: Consider Appointing Four Members to the Planning Commission
FROM: Serge Avila, Town Clerk
RECOMMENDATION: For the Town Council to consider appointing four members to the Planning Commission for a four year term.

BACKGROUND & DISCUSSION
The Planning Commission is an active committee established in 1938. Its primary role is to consider how land use decisions affect the Town. In this role, the Commission has review and approval authority for design review, use permits, variances, zoning changes and planned developments. The Commission makes recommendations to the Town Council regarding plan and ordinance updates.

The Planning Commission has a membership of seven seats appointed by the Town Council to serve four-year terms.

Currently there are two expired terms and two vacancies. The Committee is composed of the following members with their respective expiring terms:

Name Term Term Expiration
Gary Smith Current August 27, 2028
Jennifer Asselstine Expired August 18, 2025
Tim Heiman Expired August 18, 2025
Peter Thomas Strauss Current August 18, 2026
Kim Pipkin Current August 18, 2026
Vacant
Vacant
There are four (4) seats available.
221
Item #: 3.1
The Council may consider making (4) appointments to the Planning Commission from the following list of applicants:

List of applicants:

Tara Ticknor- interviewed earlier today
Jacob “Jake” Shemano- interviewed earlier today
Elizabeth Thomas- interviewed earlier today
Paul Corning- interviewed earlier today
Jennifer Asselstine- incumbent- interviewed earlier today Tim Heiman- incumbent- interviewed earlier today

FISCAL IMPACT
There would be no direct fiscal impact on the Town to approve this item.

CEQA AND CLIMATE ACTION PLAN CONSISTENCY
The proposed appointment is not a “project” under the California Environmental Quality Act, because it does not involve an activity which has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. (Cal. Pub. Res.

Code § 21065).

ATTACHMENTS
Attachment 1- Tara Ticknor- Application no Resume
Attachment 2- Jacob “Jake” Shemano- Application w/Resume Attachment 3- Elizabeth Thomas- Application w/Resume
Attachment 4- Paul Corning- Application w/Resume
Attachment 5- Jennifer Asselstine- Application no Resume Attachment 6- Tim Heiman- Application w/Personal Statement 222
Submit Date: May 24, 2025
First Name Middle
Initial
Last Name
Email Address
Home Address Suite or Apt
City State Postal Code
Primary Phone Alternate Phone
Town of San Anselmo, CA
Application for Appointment to a San Anselmo Board/Commission/Committee Profile
Occupation
Structural Engineer
Employer's Address
Which Boards would you like to apply for?
Planning Commission: Submitted
Number of years as resident of San Anselmo?
18 Number of years as a resident in Marin?
20 Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:

John Merten 415-721-0905 Scott Henderson (415) 521-0564 Kirsten Barre (415) 794-9001 Education Level Achieved *
College/University Degree
Interests & Experiences
Tara M Ticknor
Tara M Ticknor
223
Upload a Resume
You may attach other documentation which you
believe would be helpful to the Council in its
selection process.

I would be able to regularly attend the meetings of this Board/Commission/Committee.

Yes No
I would be available to attend additional meetings when they are necessary.

Yes No
I am familiar with the responsibilities and functions of this Board/Commission/Committee.

Yes No
I have attended meetings of the Board/Commission/Committee as a member of the public.

Yes No
List briefly, previous experience serving the public office, and/or civic commissions, boards, or committees:

N/a
Reasons for this appointment:

Extensive and valuable experience in the construction industry What are your qualifications for this appointment?
I have worked in the field of structural engineering for 25 years. I have worked on residential, commercial, and public projects. I am very familiar with the construction industry and how building and design impact communities. I have worked on projects in seismic and flood and WUI zones and am familiar with requirements of these projects.

Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?
Housing quantity and affordability and flooding of our downtown areas LinkedIn Profile
https://www.linkedin.com/in/taraticknor?
utm_source=share&utm_campaign=share_via&utm_content=profile&utm_medium=ios_app Tara M Ticknor
224
Please Agree with the Following Statement
I understand that I and all other applicants will be personally interviewed by the Town Council (or the entity overseeing the Steering and Short Term Committees) as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.

I Agree
E-Signature:

Tara Ticknor
Thank you for your interest in serving the Town of San Anselmo and its citizens. For further information, please contact the Town Clerk, [email protected] or 415-258- 4660.

Tara M Ticknor
225
226
227
228
Jacob “Jake” Shemano
| LinkedIn
1 EDUCATION
University of Southern California, Los Angeles, CA
B.S., Policy, Planning & Development – Urban Planning & Development, 2005 Cornell University, Ithaca, NY
Commercial Real Estate Certificate, 2020

LICENSES
California Department of Real Estate – Broker License (No. 01848976)

CORE COMPETENCIES
• Real Estate Development: 10+ years overseeing residential, mixed-use, and commercial developments nationwide. Deep expertise in entitlements, zoning, environmental review, directing consultants, budgeting, scheduling, and community engagement.
• Sales, Acquisitions & Leasing: Proven track record in negotiating purchase agreements, leases, termination agreements, completing due diligence investigations, title review, and managing escrow.
• Property & Asset Management: Managed large, diverse portfolios of apartments with expertise in rent control, fair housing laws, refining operating budgets, and vendor/staff oversight.
• Project Management: Experienced owners representative responsible for negotiating GC contracts, project oversight, budget management, schedule management, pay application review, and punch listing.
• Construction: Practical carpentry skills; proficient in reading blueprints, framing, finish carpentry, and painting.
• Technology: Microsoft Office Suite, Google Suite, Dropbox, DocuSign, Adobe Acrobat, tenant tracking databases.
229
Jacob “Jake” Shemano
181 Tunstead Avenue, San Anselmo, California
(415) 845-5768 | [email protected] | LinkedIn
2 PROFESSIONAL EXPERIENCE
United Growth – San Rafael, CA | Commercial Real Estate Development Development Manager | Sep 2023 – Present
• Oversee full lifecycle of commercial development projects from due diligence through tenant delivery.
• Manage entitlement processes, tenant selection, and landlord deliverables.

Abode Communities – Remote | Affordable Housing Development Senior Acquisitions Manager | Jan 2022 – Sep 2023
• Sourced and modeled new investment opportunities.
• Negotiated purchase, relocation, and termination agreements; led community outreach and entitlements.

Realtex, Inc. – San Francisco, CA | Multifamily Real Estate Development Development / Project Manager | Nov 2014 – Jan 2022
• Directed $55M in land acquisitions and secured entitlements for multiple highprofile developments. • Led tenant buyouts, consultant coordination, and city agency engagement.

Canyon Pacific Management – San Francisco, CA | Property Management Association Manager | Aug 2013 – Apr 2014
• Managed operations for nine condominium associations and a commercial property (286 units).

Chandler Properties – San Francisco, CA | Property Management, Sales & Leasing Property Manager / Investment Sales & Leasing Associate | Oct 2009 – Jan 2013 • Managed 15 multifamily properties (324 units) across San Francisco. • Successfully leased 250+ apartments.

AGI Capital – San Francisco, CA | Residential & Commercial Development Development Intern | May 2009 – Sep 2009
• Evaluated foreclosure investment opportunities.
• Assisted in the delivery of a self-storage facility.

Early Career – Carpentry & Construction Roles | 2001 – 2008 • Worked on residential renovations, houseboat construction, and luxury home builds in the San Francisco Bay Area.
230
231
232
233
Elizabeth Thomas
San Anselmo, CA 94960
RELATED WORK EXPERIENCE:

DoorDash, Inc. San Francisco, CA
Director, Real Estate Legal 2020 - present
● Established and built in-house real estate legal function to support rapid national expansion of multiple business units.

Manage transactions in North America for all business units including parcel delivery, quick convenience, personal delivery devices, drones and corporate. Asset classes include office, R&D, retail, warehouse, and land. ● Manage and train teams of outside counsel at multiple law firms, and internal attorneys and paralegals. ● Built infrastructure to streamline cohesive legal transaction management. Established portfolio-wide transaction standards and negotiating positions.
● Seconded to internal business unit to accelerate growth of real estate portfolio.

Uber Technologies, Inc. San Francisco, CA
Director, Real Estate Legal 2015 - 2020
● In-house commercial real estate attorney. Managed transactions in the United States for rideshare, autonomous vehicles, air mobility, food delivery, bikes and scooters, freight, and special projects. ● Collaborated with internal finance, insurance, facilities, procurement, business development and corporate groups to set guidelines and policies for leasing and transaction management.

Coblentz Patch Duffy & Bass LLP San Francisco, CA
Associate Attorney, Real Estate Group 2011 - 2014
● Commercial real estate attorney with San Francisco-based law firm ranked top tier real estate firm by Chambers USA. ● Drafted and negotiated office, industrial, retail, and ground leases, purchase and sale agreements, option agreements, listing agreements, easement agreements, and related documents. ● Notable Transactions: leasing office, warehouse and industrial properties for PG&E; leasing multiple new restaurant locations for Boudin Bakery as tenant; leasing portfolio of South Bay properties to technology companies for Equity Office Properties as landlord; leasing portfolio of industrial properties for Morgan Stanley as landlord.

Goulston & Storrs, PC Boston, MA
Associate Attorney, Real Estate Group 2006 - 2009
● Commercial real estate attorney with Boston-based law firm recognized by American Lawyer’s AmLaw 200 list. ● Practice included leasing, purchase and sales, development, land use, financing, and affordable housing. ● Notable Transactions: portfolio acquisition of forty-five commercial properties by Beacon Capital Partners from Equity Office Properties; local permitting matters for Blackstone Properties; leasing, acquisition, and permitting of Shire Pharmaceuticals corporate campus; leasing of build-to-suit headquarters for National Grid, certified LEED Platinum.

Simpson Asset Management Company Boston, MA
Vice President 2006 - 2011
● Managed property management company and leasing team for two office buildings in downtown Boston. ● Directed the sale of an office building and adjacent hotel in downtown Washington, D.C. to investment group led by national commercial real estate developer.

Shearman & Sterling LLP Menlo Park, CA
Corporate Paralegal – Capital Markets and Mergers & Acquisitions 1998 – 1999 ● Corporate paralegal for public offerings of equity and debt, mergers and acquisitions, and corporate advisory services. ● Notable Transactions: $325 million high-yield debt offering for Amazon.com, secondary public offering for E-Bay, Inc.

Vrolyk & Company LLC San Francisco, CA
Corporate Finance Analyst 1996 – 1998
● Member of six-person team providing merger and acquisition advisory and private equity and debt placement services.

Prepared financial analysis and valuations, client presentations, industry reports, and private placement memoranda.

EDUCATION:

Boston College Law School Newton, MA
Juris Doctor May 2006
Middlebury College Middlebury, VT
Bachelor of Arts in International Politics and Economics / French May 1996 234
235
236
237
Paul Corning
Clear Academy LLC – Cheyenne, WY (2013-2017)
Principal, Founder – Co-founded startup to develop mobile applications ● Developed Clear English app to help English language learners improve their pronunciation.

BMP Holdings LLC – San Francisco, CA (2007-2010)
CEO, Co-Founder – Co-founded startup to develop social editing technology. ● Developed Daily Paws, a consumer web site to support research in novel collaborative filtering techniques.

Springcreek Advisors LLC – Corte Madera, CA (2003 – 2009) Director – Joined to help transform a small investment advisory firm. ● Served as acting co-CEO, hired investment advisory and legal teams, recruited permanent CEO.

OpenDesign, Inc. – South San Francisco, CA (2000 – 2001) Director of Product Management – Experimental peer-to-peer networking startup.

NetSanity, Inc. – Redwood City, CA (1999 – 2000)
Director of Mobile Products – Internet applications for mobile phones.

Diamond Multimedia Systems, Inc. – San Jose, CA (1995 – 1999) Country Manager (1997 – 1999) – Managed Australia and New Zealand business for a leading manufacturer of personal computer peripheral hardware.
● Incorporated company in Australia, ran sales, marketing and advertising.

Product Line Manager (1997 – 1997)
● Defined and launched consumer hardware/software products..

Fakespace, Inc. – Menlo Park, CA (1993-1994)
Sales and Marketing Manager – Managed sales, wrote business plan for a VR display manufacturer.

SRI International – Menlo Park, CA (1988 – 1993)
Consultant to SRI – Worked for Sciences Division of a non-profit research institute. ● Worked with 3 research teams to win development projects, wrote org plan for $90 million business unit.

Education: University of California at Berkeley – Berkeley, CA (M.B.A.) Wesleyan University – Middletown, CT (B.A. – Philosophy) 238
239
240
241
Submit Date: Jun 23, 2025
First Name Middle
Initial
Last Name
Email Address
Home Address Suite or Apt
City State Postal Code
Primary Phone Alternate Phone
Town of San Anselmo, CA
Application for Appointment to a San Anselmo Board/Commission/Committee Profile
Occupation
Structural Engineer
Employer's Address
Retired
Which Boards would you like to apply for?
Planning Commission: Submitted
Number of years as resident of San Anselmo?
22 Number of years as a resident in Marin?
22 Name and phone numbers of three San Anselmo residents who can be contacted for referral information about me:

Alan Cascio 415-246-1783 Matt Brazler 415-271-5294 Nancy Grover 415-453-3549 Education Level Achieved *
Master's Degree
Interests & Experiences
Tim L Heiman
Tim L Heiman
242
Upload a Resume
I would be able to regularly attend the meetings of this Board/Commission/Committee.

Yes No
I would be available to attend additional meetings when they are necessary.

Yes No
I am familiar with the responsibilities and functions of this Board/Commission/Committee.

Yes No
I have attended meetings of the Board/Commission/Committee as a member of the public.

Yes No
List briefly, previous experience serving the public office, and/or civic commissions, boards, or committees:

Fund raising committees for our son's elementary and hight schools. Member of SA Planning commisison for almost 8 years in which I have served as Vice-Chair and Chair. I am the current Vice-Chair of the commisson.

Reasons for this appointment:

Since I am retired I have the time and wish to continue being involved in our community. I feel that the planning commission matches ny interests and professional experience.

What are your qualifications for this appointment?
My professional experience working with and undestanding complex code provisions. Also my experience working with other design professionals on residential and commerical projects.

Briefly, what do you consider to be the most important, one or two current issues facing this Board/Commission/Committee?
The development of additional housing in our town by encouraging ADU's and multi-family housing and/or mixed use projects which are in conformance with SA's housing element and blend in with the surrounding neighborhood. As a planning commissioner I have suggested several changes to SA's developemnt code allowing smaller lot sizes and lot line adjustments to non-conforming lots to encourage housing. A second important issue is maintaining a vibrant downtown commercial district by assisting the developemnt of new businesses.

LinkedIn Profile
https://www.linkedin.com/in/tim-heiman-45563511
SA_Planning_Personal_Statement_-
6-23-25.pdf
Tim L Heiman
243
You may attach other documentation which you
believe would be helpful to the Council in its
selection process.

Please Agree with the Following Statement
I understand that I and all other applicants will be personally interviewed by the Town Council (or the entity overseeing the Steering and Short Term Committees) as part of the selection process for this appointment. I also understand that my application material will be a public document and available on the Town's website. Sensitive materials that you don't wish to be posted on the website should not be included with the application.

I Agree
E-Signature:

Tim L. Heiman
Thank you for your interest in serving the Town of San Anselmo and its citizens. For further information, please contact the Town Clerk, [email protected] or 415-258- 4660.

Tim L Heiman
244
Personal Statement
I have been a practicing Structural Engineer for over 40 years in the SF Bay Area. During that time I have consulted with Architects and Contractors on a wide variety of residential and commercial projects ranging from senior living facilities and affordable housing projects to hospitals and higher education projects. Thru my work I have gained an understanding of codes and planning issues such as setbacks, height limits, density bonuses and parking requirements. I also understand how development can impact the local community, both positively and negatively.

While not a licensed Architect, my undergraduate Architectural Engineering degree program included three years of pre-architecture and design classes. In addition, I have been exposed to many different types of building design over the years and have a sense when a proposed design fits in with the adjacent surroundings. As a LEED accredited professional, I also understand how the design and construction of the built environment can be done with minimal impact on the environment.

As a practicing Structural Engineer, I feel I can bring a unique perspective to the Planning Commission. While the impact to adjacent buildings due to structural issues are minimal on flatland development that is not necessarily the case on hillside development. Hillside excavations can create slope stability problems and alter drainage patterns both of which can affect neighbors. As a structural engineer, I understand these issues and have worked with Geotechnical and Civil engineers to mitigate these them.

Local Project Experience
During my career I have been the structural engineer many projects throughout the Bay Area including Marin and Sonoma Counties. I also designed my own home in San Anselmo. A partial list of my local projects include:
• Marin Health – Oak Pavilion Hospital Addition & West Wing Renovation • Kaiser Santa San Rafael - Various Renovation Projects • Kaiser San Santa Rosa - North Wing Addition & Medical Office Building • Villa Marin Retirement Residences, San Rafael
• Spring Lake Village Retirement Residences, Santa Rosa TIM L. HEIMAN, SE
245

← All documents from this meeting