BID TABULATION FOR
TC22-008 TC22-009: GENEVIEVE AND RALSTON LIGHTING CIRCUIT BID OPENING: 08/31/23 @ 2:30PM
FILE: PROJECT NO. TC22-008 & TC22-009: GENEVIEVE AND RALSTON LIGHTING CIRCUIT Item
No. BID ITEM DESCRIPTION Estimated
Quantity Unit LOW BIDDER
BELCO
2ND LOW
ILB
3RD LOW
COMET
4TH LOW
ESPINOZA ELECTRIC INC.DBA
QLE
5TH LOW 6TH LOW 7TH LOW
BID SCHEDULE Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total SCHEDULE NO. 1 GENEVIEVE
1.1 MOBILIZATION 1 LS $ 18,000.00 $ 18,000.00 $ 56,294.00 $ 56,294.00 $ 90,000.00 $ 90,000.00 $ 87,000.00 $ 87,000.00
1.2 TRAFFIC CONTROL 1 LS $ 18,000.00 $ 18,000.00 $ 7,084.00 $ 7,084.00 $ 10,000.00 $ 10,000.00 $ 20,000.00 $ 20,000.00
1.3 FURNISH AND INSTALL STREET LIGHT SERVICE PEDESTAL PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-2 1 EA $ 8,200.00 $ 8,200.00 $ 5,265.00 $ 5,265.00 $ 10,000.00 $ 10,000.00 $ 15,237.00 $ 15,237.00
1.4 FURNISH AND INSTALL TYPE III-C SERVICE EQUIPMENT ENCLOSURE PER CALTRANS STANDARD PLAN ES-2F 1 EA $ 10,300.00 $ 10,300.00 $ 8,018.00 $ 8,018.00 $ 9,000.00 $ 9,000.00 $ 17,163.00 $ 17,163.00
1.5 FURNISH AND INSTALL NO. 3 1/2 PULL BOX PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-2 52 EA $ 605.00 $ 31,460.00 $ 1,004.00 $ 52,208.00 $ 700.00 $ 36,400.00 $ 323.00 $ 16,796.00
1.6 FURNISH AND INSTALL NO. 5 PULL BOX PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-2 1 EA $ 830.00 $ 830.00 $ 1,934.00 $ 1,934.00 $ 3,808.00 $ 3,808.00 $ 757.00 $ 757.00
1.7 FURNISH AND INSTALL STRESSCRETE CALIFORNIA 15' CONCRETE POLE WITH KING POST TOP ACORN LUMINAIRE WASHINGTON 36 EA $ 11,067.00 $ 398,412.00 $ 10,226.00 $ 368,136.00 $ 10,000.00 $ 360,000.00 $ 17,331.00 $ 623,916.00
1.8 REMOVE EXISTING STREET LIGHT AND FOUNDATION 34 EA $ 1,160.00 $ 39,440.00 $ 2,233.00 $ 75,922.00 $ 2,500.00 $ 85,000.00 $ 3,163.00 $ 107,542.00
1.9 FURNISH AND INSTALL PHOTOELECTRIC CONTROL UNIT 2 EA $ 195.00 $ 390.00 $ 268.00 $ 536.00 $ 587.00 $ 1,174.00 $ 209.00 $ 418.00
1.1 REMOVE AND REINSTALL EXISTING SIGN 9 EA $ 250.00 $ 2,250.00 $ 246.00 $ 2,214.00 $ 449.00 $ 4,041.00 $ 343.00 $ 3,087.00
1.11 REMOVE EXISTING HPS LUMINAIR AND REPLACE WITH NEW CREE LED TYPE E 2 EA $ 770.00 $ 1,540.00 $ 754.00 $ 1,508.00 $ 1,672.00 $ 3,344.00 $ 974.00 $ 1,948.00
1.12 FURNISH AND INSTALL 2" SCHEDULE 80 PVC CONDUIT 5,335 LF $ 52.00 $ 277,420.00 $ 74.60 $ 397,991.00 $ 61.00 $ 325,435.00 $ 10.00 $ 53,350.00
1.13 FURNISH AND INSTALL 3” SCHEDULE 80 PVC CONDUIT 50 LF $ 100.00 $ 5,000.00 $ 339.00 $ 16,950.00 $ 205.00 $ 10,250.00 $ 70.00 $ 3,500.00
1.14 FURNISH AND INSTALL 3" SCHEDULE 80 PVC CONDUIT WITH PULL ROPE 40 LF $ 110.00 $ 4,400.00 $ 95.00 $ 3,800.00 $ 232.00 $ 9,280.00 $ 120.00 $ 4,800.00
1.15 FURNISH AND INSTALL #4 CONDUCTOR 1,440 LF $ 3.90 $ 5,616.00 $ 3.00 $ 4,320.00 $ 3.00 $ 4,320.00 $ 48.00 $ 69,120.00
1.16 FURNISH AND INSTALL #6 CONDUCTOR 4,840 LF $ 3.00 $ 14,520.00 $ 2.50 $ 12,100.00 $ 2.00 $ 9,680.00 $ 15.00 $ 72,600.00
1.17 FURNISH AND INSTALL #8 CONDUCTOR 9,015 LF $ 2.40 $ 21,636.00 $ 2.00 $ 18,030.00 $ 2.00 $ 18,030.00 $ 9.00 $ 81,135.00
1.18 FURNISH AND INSTALL #10 CONDUCTOR 5,020 LF $ 1.80 $ 9,036.00 $ 1.75 $ 8,785.00 $ 1.00 $ 5,020.00 $ 14.00 $ 70,280.00
1.19 FURNISH AND INSTALL #14 CONDUCTOR 810 LF $ 1.60 $ 1,296.00 $ 1.00 $ 810.00 $ 1.00 $ 810.00 $ 81.00 $ 65,610.00
1.2 REWIRE EXISTING TRAFFIC SIGNAL AT SIERRA WAY AT MARSHALL BLVD FOR 4 PHASE OPERATION USING MULTI-CONDUCTOR CABLES WITH NEW UNDERGROUND CONDUIT 1 LS $ 20,068.00 $ 20,068.00 $ 8,442.00 $ 8,442.00 $ 23,000.00 $ 23,000.00 $ 40,000.00 $ 40,000.00
1.21 CONSTRUCTION 4’ x 8’ PROJECT SIGN 1 LS $ 2,500.00 $ 2,500.00 $ 3,047.00 $ 3,047.00 $ 5,000.00 $ 5,000.00 $ 2,613.00 $ 2,613.00
1.22 WATER POLLUION CONTROL, BEST MANAGEMENT PRACTICES 1 LS $ 2,000.00 $ 2,000.00 $ 3,047.00 $ 3,047.00 $ 2,500.00 $ 2,500.00 $ 5,750.00 $ 5,750.00 SCHEDULE NO. 1 GENEVIEVE SUBTOTAL $ 892,314.00 $ 1,056,441.00 $ 1,026,092.00 $ 1,362,622.00 SCHEDULE NO. 2 RALSTON
2.1 MOBILIZATION 1 LS $ 18,000.00 $ 18,000.00 $ 58,394.00 $ 58,394.00 $ 90,000.00 $ 90,000.00 $ 10,000.00 $ 10,000.00
2.2 TRAFFIC CONTROL 1 LS $ 19,000.00 $ 19,000.00 $ 7,084.00 $ 7,084.00 $ 10,000.00 $ 10,000.00 $ 20,000.00 $ 20,000.00
2.3 FURNISH AND INSTALL STREET LIGHT SERVICE PEDESTAL PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-2 2 EA $ 8,200.00 $ 16,400.00 $ 5,109.00 $ 10,218.00 $ 10,000.00 $ 20,000.00 $ 19,924.50 $ 39,849.00
2.4 FURNISH AND INSTALL NO. 3 ½ PULL BOX PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-2 83 EA $ 605.00 $ 50,215.00 $ 992.00 $ 82,336.00 $ 1,000.00 $ 83,000.00 $ 575.63 $ 47,777.29
2.5 FURNISH AND INSTALL NO. 5 PULL BOX PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-2 2 EA $ 830.00 $ 1,660.00 $ 1,340.00 $ 2,680.00 $ 1,700.00 $ 3,400.00 $ 1,225.00 $ 2,450.00
2.6 FURNISH AND INSTALL STREET LIGHT POLE TYPE B FIXTURE, TYPE III DISTRIBUTION PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-1 50 EA $ 7,074.00 $ 353,700.00 $ 5,763.00 $ 288,150.00 $ 6,500.00 $ 325,000.00 $ 11,221.94 $ 561,097.00
2.7 FURNISH AND INSTALL STREET LIGHT POLE TYPE C FIXTURE, TYPE III DISTRIBUTION PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-1 6 EA $ 7,892.00 $ 47,352.00 $ 6,734.00 $ 40,404.00 $ 8,500.00 $ 51,000.00 $ 13,209.17 $ 79,255.02
2.8 FURNISH AND INSTALL STREET LIGHT POLE TYPE D FIXTURE, TYPE IV DISTRIBUTION PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-1 4 EA $ 9,628.00 $ 38,512.00 $ 6,734.00 $ 26,936.00 $ 8,500.00 $ 34,000.00 $ 13,209.25 $ 52,837.00
2.9 FURNISH AND INSTALL BACK LIGHT CONTROL SHIELD BY MANUFACTURER 6 EA $ 150.00 $ 900.00 $ 215.00 $ 1,290.00 $ 500.00 $ 3,000.00 $ 641.34 $ 3,848.04
2.1 FURNISH AND INSTALL PHOTOELECTRIC CONTROL UNIT 2 EA $ 195.00 $ 390.00 $ 433.00 $ 866.00 $ 600.00 $ 1,200.00 $ 463.50 $ 927.00
2.11 REMOVE AND REINSTALL EXISTING SIGN 2 EA $ 250.00 $ 500.00 $ 701.00 $ 1,402.00 $ 800.00 $ 1,600.00 $ 1,259.50 $ 2,519.00
2.12 REMOVE EXISTING SIGN AND INSTALL NEW SIGN 4 EA $ 500.00 $ 2,000.00 $ 353.00 $ 1,412.00 $ 600.00 $ 2,400.00 $ 135.00 $ 540.00
2.13 CONSTRUCT MEANDERING SIDEWALK 3 SF $ 400.00 $ 1,200.00 $ 594.00 $ 1,782.00 $ 1,300.00 $ 3,900.00 $ 5,825.00 $ 17,475.00
2.14 UPGRADE EXISTING PULL BOX BOLTS TO PENTA HEAD PER CALTRANS STANDARD ES-8A (per bolt) 60 EA $ 22.00 $ 1,320.00 $ 37.00 $ 2,220.00 $ 72.00 $ 4,320.00 $ 270.95 $ 16,257.00
2.15 REMOVE EXISTING STREET LIGHT AND FOUNDATION 43 EA $ 1,160.00 $ 49,880.00 $ 2,151.00 $ 92,493.00 $ 2,000.00 $ 86,000.00 $ 4,029.07 $ 173,250.01
2.16 FURNISH AND INSTALL 2” SCHEDULE 80 PVC CONDUIT 8,455 LF $ 52.00 $ 439,660.00 $ 56.00 $ 473,480.00 $ 51.00 $ 431,205.00 $ 49.40 $ 417,677.00
2.17 FURNISH AND INSTALL 3” SCHEDULE 80 PVC CONDUIT WITH PULL ROPE 20 LF $ 110.00 $ 2,200.00 $ 226.00 $ 4,520.00 $ 500.00 $ 10,000.00 $ 1,337.20 $ 26,744.00
2.18 FURNISH AND INSTALL #8 CONDUCTOR 11,305 LF $ 2.40 $ 27,132.00 $ 2.00 $ 22,610.00 $ 2.00 $ 22,610.00 $ 28.55 $ 322,757.75
2.19 FURNISH AND INSTALL #10 CONDUCTOR 22,700 LF $ 1.80 $ 40,860.00 $ 1.75 $ 39,725.00 $ 1.00 $ 22,700.00 $ 14.28 $ 324,156.00
2.2 FURNISH AND INSTALL #14 CONDUCTOR 855 LF $ 1.60 $ 1,368.00 $ 1.00 $ 855.00 $ 2.00 $ 1,710.00 $ 363.82 $ 311,066.10
2.21 FURNISH AND INSTALL CONDUIT CROSSINGS (SONORA DRIVE) 160 LF $ 200.00 $ 32,000.00 $ 152.00 $ 24,320.00 $ 145.00 $ 23,200.00 $ 184.93 $ 29,588.80
2.22 FURNISH AND INSTALL NO. 3 ½ PULL BOX PER CITY OF SAN BERNARDINO STANDARD DRAWING SL-2 FOR SONORA DRIVE CROSSINGS 6 EA $ 605.00 $ 3,630.00 $ 1,004.00 $ 6,024.00 $ 1,100.00 $ 6,600.00 $ 2,450.67 $ 14,704.02
2.23 CONSTRUCTION 4’ x 8’ PROJECT SIGN 1 LS $ 3,000.00 $ 3,000.00 $ 3,047.00 $ 3,047.00 $ 4,100.00 $ 4,100.00 $ 2,603.00 $ 2,603.00
2.24 WATER POLLUION CONTROL, BEST MANAGEMENT PRACTICES 1 LS $ 2,000.00 $ 2,000.00 $ 3,047.00 $ 3,047.00 $ 2,500.00 $ 2,500.00 $ 5,750.00 $ 5,750.00 SCHEDULE NO. 2 RALSTON SUBTOTAL $ 1,152,879.00 $ 1,195,295.00 $ 1,243,445.00 $ 2,483,128.03 TOTAL BID SCHEDULE $ 2,045,193.00 $ 2,251,736.00 $ 2,269,537.00 $ 3,845,750.03 $ - $ - $ -