REQUEST FOR VENDOR QUOTES
Project No. RFQ F-23-54
ATTACHMENT "C"
VENDOR QUOTE FORM
VENDOR NAME: JTB Supply Co.
1030. N. Batavia sn
ADDRESS: ste. A Orange, CA. 92867
PHONE: 714-439-9498
The undersigned, hereby declare that they have carefully examined the location of the proposed work. familiarized themselves with the local conditions affecting the cost of the work, and have read and examined the terms and conditions for the following Project:
TRAFFIC SIGNAL SUPPLIES
The undersigned, hereby propose to furnish all labor, materials, equipment, tools, transportation, and services, and to dice with ale Vendor Pride aire for the ELECTRONICALLY SUBMITTED TOTAL VENDOR DUOTE PRICE.
Description Quantity Cost per Total Cost
(annual) Unit
8" 3 Section Signal Head w/LED's, Louvered Back °394
10 * 3,940
and Tunnel Visors
12" 3 Section Signal Head w/LED's (RYG), "407 "14,980
40 Louvered Back Plates and Tunnel Visors
8" Louver Back-Plates, 3 Section 10 "47 •470
12" Louver Back-Plates, 3 Section 30 "42 1,240
12" 5 Section In-Line Signal Head w/LED's
(RYG,YA, GA), Louvered Back Plates and Tunnel 10 =682 °4,820 Visors
12" 5 Section "Doghouse" Style (MAS) w/LED's
(RYG, YA,GA), Louvered Back Plates and Tunnel 5 =935 =4, l75 Visors
8" Tunnel Visors 100 "16 41,000
12" Tunnel Visors 200 "19 *3,800
Pedestrian Housing (Clam Shell) Hand/Man w/LED 30 *238 -7,140 DC Isolator 222 25 " 43 1,075
Load Switch 200 100 "24 *2,400
Flasher 204 100 *24 *2,400
Detector 222 50 *147 47,350
Ped-button, ADA 150 552 *7,800
Ped-button Assembly w/ADA Button and directional 123
100 12,300
signs
Conflict Monitor 210 15 4578 *8,670
REQUEST FOR VENDOR QUOTES
Project No. RFQ F-23-54
Quantity Cost per Total Cost
Description
(annual) Unit
Conflict Monitor 2010 ECL 10 *825 "8,250
Framework (Bronze), SV-1-T (LOD) for 12" 3 = 283
10 "2,830
section head
Framework (Bronze), SV-2-T for 12" 3 section *350
10 "3,500
head
Framework (Bronze), TV-1-T (LOD) for 12 " 3
10 "398 * 3,980
section head
Framework (Bronze), TV-2-T for 12" 3 section "467
10 *4,670
heads
Framework (Bronze), TV-2-T 12" 5 section 5 - 487 12,435 (LOD), 12" 3 section (ROD)
Framework (Bronze), SP-1-T 10 • 268 *2,480
Framework (Bronze), SP-2-T 10 •332 *3,320
8" Red LED 40 + 36 1,440
8" Yellow LED 12 "HD 4480
8" Green LED 40 336 51,440
12" Red LED Ball 100 * 39 " 3,900
12" Yellow LED Ball 20 " 43 '840
12" Green LED Ball 100 142 °4,200
12" Red Arrows 50 147 °2,350
12" Yellow Arrows 20 •44 *880
12" Green Arrows 50 • 44 °2,300
Pedestrian Module Hand/Man (Count Down) 50 160 78,000
24VDC Power Supply 206 10 * 315 "3,150
TOTAL VENDOR QUOTE *148,445
Total Number of Additional Pages:
I hereby declare under penalty of perjury that the foregoing is true and correct.
Submitted By:- Wendy Musers Title: Inside sales manager (Authorized Representative Signature)
Print Name: Mindy myers
Contractor's License Number and Classification: N/A
DIR Registration Number (if applicable): N/A
REQUEST FOR VENDOR QUOTES
Project No. RFQ F-23-54
The term of this agreement will be from July 1, 2023 to Jun 30, 2024 WITH FOUR (4) 1 year option to extend.
Overall Pricing for Option Years MUST be indicated below:
OPTION YEAR OVERALL TOTAL COST (ALL ITEMS)
Option Year #1 July 1, 2024 to June 30, 2025 $
153,105
Option Year #2 July 1, 2025 to June 30, 2026 $
160,900
Option Year #3 July 1, 2026 to June 30, 2027 $
144,000
Option Year #4 July 1, 2027 to June 30, 2028 $
167,500