BID TABULATION FOR
TC22-008 TC22-009: GENEVIEVE AND RALSTON LIGHTING CIRCUIT BID OPENING: 08/31/23 @ 2:30PM
FILE: PROJECT NO. TC22-008 & TC22-009: GENEVIEVE AND RALSTON LIGHTING CIRCUIT Item No. BID ITEM DESCRIPTION Estimated
Quantity Unit
BID SCHEDULE Unit Price Total Unit Price Total Unit Price Total SCHEDULE NO. 1 Pavement Rehabilitation at Twenty-One Locations
1.1 MOBILIZATION/CLEARING AND GRUBBING 1 LS 1,662,000.32$ 1,662,000.32$ 500,000.00$ 500,000.00$ 906,048.80$ 906,048.80$
1.2 TRAFFIC CONTROL 1 LS 460,000.00$ 460,000.00$ 510,000.00$ 510,000.00$ 950,000.00$ 950,000.00$
1.3 STORMWATER POLLUTION AND PREVENTION PLAN AND NPDES COMPLIANCE 1 LS 22,000.00$ 22,000.00$ 10,000.00$ 10,000.00$ 100,000.00$ 100,000.00$
1.4 CONSTRUCT PCC CURB & GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 343 LF 81.00$ 27,783.00$ 82.00$ 28,126.00$ 130.00$ 44,590.00$
1.5 CONSTRUCT PCC CURB PER CITY OF SAN BERNARDINO STANDARD 200, TYPE A TO MATCH EXISTING; MILL ALL CURB CUTS 25 LF 81.00$ 2,025.00$ 86.00$ 2,150.00$ 130.00$ 3,250.00$
1.6 CONSTRUCT PCC CURB ACCESS RAMP WITH 3'X4' CAST-IN-PLACE TRUNCATED DOME SURFACE, MIN 5' TRANSITION PANELS, CURB & GUTTER AND AC SLOT PATCH 183 EA 6,700.00$ 1,226,100.00$ 7,700.00$ 1,409,100.00$ 13,000.00$ 2,379,000.00$
1.7 CONSTRUCT PCC CURB ACCESS RAMP WITH 3'X4' CAST-IN-PLACE TRUNCATED DOME SURFACE, MIN 5' TRANSITION PANELS, CURB & GUTTER AND AC SLOT PATCH. INCLUDES
REBUILDING AND/OR REPLACING DECK DRAIN LID, MANHOLE RING, COVER SLIM RING & COVER. 8 EA 9,500.00$ 76,000.00$ 15,000.00$ 120,000.00$ 15,000.00$ 120,000.00$
1.8 CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE COMPACTED TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 418 SF 11.60$ 4,848.80$ 15.00$ 6,270.00$ 20.00$ 8,360.00$
1.9 CONSTRUCT PCC SPANDREL AND/OR CROSS GUTTER PER STANDARD 201 AND PER
PROJECT PLANS AND SPECIFICATIONS
2,100 SF 28.40$ 59,640.00$ 37.00$ 77,700.00$ 35.00$ 73,500.00$
1.10 ADJUST UTILITY MANHOLES TO GRADE. SEWER, STORM DRAIN, GAS AND WATER VLAVES.
SLIP CANS SHALL BE ADJUSTED TO FINISH GRADE AT TIME OF PAVING. SLIP CAN ARE CONSIDERED PART OF PAVING. 140 EA 1,420.00$ 198,800.00$ 1,440.00$ 201,600.00$ 1,300.00$ 182,000.00$
1.11 TREE/STUMP REMOVAL 6 EA 7,400.00$ 44,400.00$ 7,200.00$ 43,200.00$ 7,000.00$ 42,000.00$
1.12 COLD MILL 3" UNIFORM DEPTH - FULL STREET WIDTH PER PROJECT PLANS AND
SPECIFICATIONS
474,965 SF 0.38$ 180,486.70$ 0.63$ 299,227.95$ 0.70$ 332,475.50$
1.13 COLD MILL 4" UNIFORM DEPTH - FULL STREET WIDTH PER PROJECT PLANS AND
SPECIFICATIONS
429,182 SF 0.48$ 206,007.36$ 0.83$ 356,221.06$ 0.90$ 386,263.80$
1.14 COLD MILL 5" UNIFORM DEPTH - FULL STREET WIDTH PER PROJECT PLANS AND
SPECIFICATIONS
99,229 SF 0.58$ 57,552.82$ 1.03$ 102,205.87$ 1.10$ 109,151.90$
1.15 AC OVER 95% COMPACTED NATIVE PER PROJECT PLANS AND SPECIFICATIONS 35,142 TN 91.00$ 3,197,922.00$ 123.00$ 4,322,466.00$ 100.00$ 3,514,200.00$
1.16 OVER EXCAVATE NATIVE SUB-GRADE IN ROADWAY UNIFORM DEPTH - FULL STREET WIDTH
PER PROJECT PLANS AND SPECIFICATIONS
5,253 CY 53.00$ 278,409.00$ 75.00$ 393,975.00$ 40.00$ 210,120.00$
1.17 REPLACE EXISTING TRAFFIC SIGNAL LOOP DETECTOR COMPLETE IN PLACE PER CALTRANS STANDARD ES-5B, PROJECT PLANS AND SPECIFICATIONS
24 EA 420.00$ 10,080.00$ 410.00$ 9,840.00$ 600.00$ 14,400.00$
1.18 FURNISH AND INSTALL RADARSIGN ROUND ALUMINUM 14' POLE OR EQUAL PER PROJECT
PLANS AND SPECIFICATIONS
4 EA 3,160.00$ 12,640.00$ 3,100.00$ 12,400.00$ 3,500.00$ 14,000.00$
LOW BIDDER
MATICH CORPORATION
3RD LOW
HARDY & HARPER, INC.
2ND LOW
ALL AMERICAN ASPHALT
BID TABULATION FOR
TC22-008 TC22-009: GENEVIEVE AND RALSTON LIGHTING CIRCUIT Item No. BID ITEM DESCRIPTION Estimated
Quantity Unit LOW BIDDER
MATICH CORPORATION
3RD LOW
HARDY & HARPER, INC.
2ND LOW
ALL AMERICAN ASPHALT
1.19 INSTALL 4" OF THERMOPLASTIC TRAFFIC STRIPING, SINAGE, PAVEMENT MESSAGES,
PAVEMENT MARKINGS, CONTINENTAL CROSSWALKS AND GLUED DOWN RPM'S, COMPLETED IN PLACE PER CALTRANS STANDARDS A20A, A20B, A24E, CITY OF LOAS ANGELES STANDARD S-481.1 AND SPECIFICATIONS. 1 LS 52,000.00$ 52,000.00$ 27,000.00$ 27,000.00$ 30,000.00$ 30,000.00$
1.20 CALIFORNIA MUTCD FIGURE 9B-3 W3-3 4 EA 158.00$ 632.00$ 156.00$ 624.00$ 200.00$ 800.00$
1.21 CALIFORNIA MUTCD FIGURE 9B-3 W3-1 11 EA 132.00$ 1,452.00$ 156.00$ 1,716.00$ 200.00$ 2,200.00$
1.22 CALIFORNIA MUTCD FIGURE 2C-6, W8-2 5 EA 132.00$ 660.00$ 156.00$ 780.00$ 200.00$ 1,000.00$
1.23 CALIFORNIA MUTCD FIGURE 2C-1, W13-1P, 15 MPH 5 EA 79.00$ 395.00$ 156.00$ 780.00$ 200.00$ 1,000.00$
1.24 CALIFORNIA MUTCD R3-7R 1 EA 132.00$ 132.00$ 104.00$ 104.00$ 200.00$ 200.00$
1.25 CALIFORNIA MUTCD FIGURE 2C-5, W14-1, 35 MPH, DEAD END 1 EA 132.00$ 132.00$ 156.00$ 156.00$ 200.00$ 200.00$
1.26 PAINT RED A-CURB (OAK ST.) 900 LF 2.63$ 2,367.00$ 3.00$ 2,700.00$ 3.00$ 2,700.00$
1.27 FURNISH AND INSTALL 2"X2" SQUARED GALVANIZED STEEL POST W/BREAK AWAY SAFETY SYSTEM. PER SAN BERNARDINO CITY STANDARD 504. INCLUDE RED SIGNPOST REFLECTOR PANEL FOR STOP SIGNS.
16 EA 237.00$ 3,792.00$ 260.00$ 4,160.00$ 300.00$ 4,800.00$
1.28 BLUE RAISED PAVEMENT MARKERS PER CALTRANS 2023 STANDARD PLAN A20A TYPE D 74 EA 10.50$ 777.00$ 6.00$ 444.00$ 10.00$ 740.00$
1.29 FURNISH AND INSTALL 2 RECTANGULAR RAPID FLASHING BEACON (RRFB) SYSTEMS. 2 EA 23,000.00$ 46,000.00$ 23,000.00$ 46,000.00$ 25,000.00$ 50,000.00$
1.30 PROJECT CONSTRUCTION SIGNS PER ACTIVE CONSTRUCTION LOCATION 2 LS 8,300.00$ 16,600.00$ 4,000.00$ 8,000.00$ 1,000.00$ 2,000.00$ -$
SCHEDULE NO. 2 TDA Article 3 Bus Stop Pads -$
2.1 MOBILIZATION 1 LS 23,500.00$ 23,500.00$ 18,000.00$ 18,000.00$ 3,800.00$ 3,800.00$
2.2 TRAFFIC CONTROL - FURNISH, INSTALL, AND MAINTAIN ALL TRAFFIC CONTROL DEVICES PER CALIFORNIA MUTCD.
1 LS 35,000.00$ 35,000.00$ 13,000.00$ 13,000.00$ 5,000.00$ 5,000.00$
2.3 HIGHLAND AVE @ WATERMAN AVE WB (STOP ID 368) - REMOVE SIDEWALK AND
CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 420 SF 14.70$ 6,174.00$ 20.00$ 8,400.00$ 30.00$ 12,600.00$
2.4 HIGHLAND AVE @ WATERMAN AVE WB (STOP ID 368) - REMOVE PCC CURB & GUTTER AND CONSTRUCT PCC CURB AND GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 60 LF 101.00$ 6,060.00$ 120.00$ 7,200.00$ 350.00$ 21,000.00$
2.5 HIGHLAND AVE @ SIERRA WAY WB (STOP ID 5721) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 320 SF 14.70$ 4,704.00$ 20.00$ 6,400.00$ 30.00$ 9,600.00$
2.6 HIGHLAND AVE @ SIERRA WAY WB (STOP ID 5721) - REMOVE PCC CURB & GUTTER AND CONSTRUCT PCC CURB AND GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 40 LF 101.00$ 4,040.00$ 120.00$ 4,800.00$ 350.00$ 14,000.00$
2.7 MILL ST. @ MT. VERNON AVE EB (STOP ID 6518) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 480 SF 14.70$ 7,056.00$ 20.00$ 9,600.00$ 30.00$ 14,400.00$
2.8 9TH ST. @ MT. VERNON AVE EB (STOP ID 5735) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 250 SF 14.70$ 3,675.00$ 20.00$ 5,000.00$ 30.00$ 7,500.00$
2.9 9TH ST. @ MT. VERNON AVE EB (STOP ID 5735) - REMOVE PCC CURB & GUTTER AND CONSTRUCT PCC CURB AND GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 50 LF 101.00$ 5,050.00$ 120.00$ 6,000.00$ 350.00$ 17,500.00$
BID TABULATION FOR
TC22-008 TC22-009: GENEVIEVE AND RALSTON LIGHTING CIRCUIT Item No. BID ITEM DESCRIPTION Estimated
Quantity Unit LOW BIDDER
MATICH CORPORATION
3RD LOW
HARDY & HARPER, INC.
2ND LOW
ALL AMERICAN ASPHALT
2.10 HIGHLAND AVE @ MOUNTAIN WB (STOP ID 5289) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 440 SF 14.70$ 6,468.00$ 20.00$ 8,800.00$ 30.00$ 13,200.00$
2.11 HIGHLAND AVE @ MOUNTAIN WB (STOP ID 5289) - REMOVE PCC CURB & GUTTER AND CONSTRUCT PCC CURB AND GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 50 LF 101.00$ 5,050.00$ 120.00$ 6,000.00$ 350.00$ 17,500.00$
2.12 SIERRA WAY @ HIGHLAND AVE SB (STOP ID 61) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 480 SF 14.70$ 7,056.00$ 20.00$ 9,600.00$ 30.00$ 14,400.00$
2.13 KENDALL DR @ H ST. WB (STOP ID 5549) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 350 SF 14.70$ 5,145.00$ 20.00$ 7,000.00$ 30.00$ 10,500.00$
2.14 KENDALL DR @ H ST. WB (STOP ID 5549) - REMOVE PCC CURB & GUTTER AND CONSTRUCT PCC CURB AND GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 20 LF 101.00$ 2,020.00$ 120.00$ 2,400.00$ 350.00$ 7,000.00$
2.15 3RD ST. @ WATERMAN AVE EB (STOP ID 7709) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 240 SF 14.70$ 3,528.00$ 20.00$ 4,800.00$ 30.00$ 7,200.00$
2.16 3RD ST. @ WATERMAN AVE EB (STOP ID 7709) - REMOVE PCC CURB & GUTTER AND CONSTRUCT PCC CURB AND GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 60 LF 101.00$ 6,060.00$ 120.00$ 7,200.00$ 350.00$ 21,000.00$
2.17 16TH ST. @ CALIFORNIA ST. EB (STOP ID 6454) - REMOVE SIDEWALK AND CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS 160 SF 14.70$ 2,352.00$ 20.00$ 3,200.00$ 30.00$ 4,800.00$
2.18 16TH ST. @ CALIFORNIA ST. EB (STOP ID 6454) - REMOVE PCC CURB & GUTTER AND CONSTRUCT PCC CURB AND GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISTING; MILL ALL CURB CUTS 40 LF 101.00$ 4,040.00$ 120.00$ 4,800.00$ 350.00$ 14,000.00$ SCHEDULE NO. 2 TDA ARTICLE 3 BUS STOP PADS SUBTOTAL 136,978.00$ 132,200.00$ 215,000.00$
TOTAL BID SCHEDULE
TOTAL BID SCHEDULE PRICE AS WRITTEN IN BID PACKAGE
7,988,612.00$ 8,629,145.88$ 9,700,000.00$
DUE TO DISCRPENCIES IN LINE ITEM TOTALS THE UNIT COST AND THE ESTIMATED QUANTITY VALUE WERE
USED TO FIND NEW LINE ITEM TOTALS RESULTING IN A TOTAL BID SCHEDULE VALUE DIFFERING FROM THE VALUE SUBMITTED. (RED TEXT ARE MODIFIED NUMBERS)
8,629,145.88$ 7,988,612.00$ 9,700,000.00$