00 41 43 - BID FORMS

BID ACKNOWLEDGMENT
Bids will be received at the office of Public Works located at 201 N 'E' Street, 2nd.

Floor, San Bernardino, California of the City of San Bernardino until 3:00 p.m. on May 1, 2024.

Rudy Hernandez Community Center Gym Flooring Replacement. NAME OF BIDDER:

HUR FLOORING CO
To the CITY OF SAN BERNARDINO, with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401.

A. In response to the Notice Inviting Bids dated April 17, 2024, and in accordance with the accompanying Instructions to Bidders, the undersigned hereby proposes to the City to furnish all labor, technical and professional services, supervision, materials and equipment, other than materials and equipment specified as furnished by the City, and to perform all operations necessary and required to construct the Project in accordance with the provisions of the Contract Documents and any addenda thereto, and at the prices stated opposite the respective items set forth in the Bid Schedule.

B. This Bid constitutes a firm offer to the City which cannot be withdrawn for 90 days after the date set for opening of Bids, or until a Contract is executed by the City and a third party, whichever is earlier.

C. The undersigned certifies that it has examined and is fully familiar with all of the provisions of the Contract Documents and any addenda thereto; that it has carefully checked all of the words and figures shown in its Bid Schedule; that it has carefully reviewed the accuracy of all statements in this Bid and attachments hereto; and that it understands and agrees that the City will not be responsible for any errors or omissions on the part of the undersigned in preparing this Bid.

D. If awarded a Contract, the undersigned agrees to execute and deliver to the City within ten (10) days after date of receipt of Notice of Award, a signed Contract and the necessary Performance Bond, Payment Bond, and Certificates of Insurance and Endorsements.

E. The following Bid Forms, which have been completed and executed by the undersigned Bidder, are incorporated by this reference and made a part of this Bid:

1. Bid Schedule

2. Bid Guarantee in the amount of not less than 10% of the Total Bid Price.

3. Completed Designation of Subcontractors form.

4. Fully executed Noncollusion Declaration form.

5. Completed Iran Contracting Act Certification form.

Rudy Hernandez Community Center -12- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement

6. Completed Public Works Contractor DIR Registration Certification form.

7. Completed Contractor's Certificate Regarding Workers' Compensation form.

8. Completed Bidder Information and Experience Fom.

F. The undersigned is hereby representing that it is and will be properly licensed both at the time that it submits a Bid as well as at the time the Contract is awarded, if the Contract is awarded to the undersigned.

1. Individual Contractor. Undersigned certifies that it is now licensed in accordance with the provisions of the Contractor's License Law of the State of California.

License number 604929
Expiration date 10/2024
License classification B, C-15, C-54
License Law of the State of California.

Member No. 1
Name
License number
Expiration date
License classification
Member No. 2
Name
License number
Expiration date
License classification
(If there are more than two members of the joint venture, attach a page for the additional members) with the above information.)
The undersigned acknowledges receipt, understanding, and full consideration of the following addenda to the Contract Documents:

Rudy Hernandez Community Center -13- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement
Addenda No. NO ADDENDA ISSUED
[SIGNATURE ON FOLLOWING PAGE]
Rudy Hernandez Community Center -14- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement
I hereby certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.

BIDDER: Bidder's Business Address:

HUR FLOORING CO 15204 Stag Street, Van Nuys, CA 91405
(Company Name)
By
(Signature)
MICHAEL S. HUR
(Type or print name)
WNER
(Title)
VAN NUYS, CA 91405
(Where signed) (City, State)
(corporate seal)
Dated: APRIL 28 _ 2022
State of Incorporation:
(If the Prime Contractor is a corporation, two signatures of corporate officers are required.) Names and addresses of all partners or joint venturers:

Statement of the authority of signatory to bind Bidder:

Rudy Hemandez Community Center -15- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement

BID SCHEDULE
Rudy Hernandez Community Center Gym Floor Replacement
ITEM NO. DESCRIPTION UNIT ESTIMATED AMOUNT SUBTOTAL
QTY
Mobilization LS 1 $6,500.00 $6,500.00
LS 1 $6,000.00 $6,000.00
flooring completion
Removal and disposal of the existing flooring

3. and/or any unclassified debris, any unused SF 8510 $1.55 $13,190.50 material beneath the flooring at the gym
Remediation of any existing damages and/or

4. depression due to imperfections in the LS 1 $7,000.00 $7,000.00 substrate floor flatness and/or the leveling

5. Relocate the pole sleeves as per the project EA 12 $600.00 $7,200.00 specifications and special provisions

6. Relocate all the existing power plugs/sockets LS 1 $1,400.00 $450.00 to the same as the original.

Furnish and install a new fixed resilient,

7. First-grade maple wood gym floor including SF 8510 $16.25 $138,287.50 the skirting.

Painting the new gym floor, marking layout
and dimensions to be same as the original

8. marking and painting (basketball court LS 1 $4,500.00 $4,500.00 striping, volleyball striping, Pickleball striping
etc.).

Design and Installation of Parks and Water

9. LS 1 $1,500.00 $1,500.00
Bond Act of 2018 (Proposition 68) Sign
TOTAL BID ITEMS (In Figures)
$185,578.00
TOTAL BID ITEMS (In Words)
One Hundred Eighty Five Thousand Five Hundred Seventy-Eight &00/100 Dollars

TOTAL BID PRICE BASED ON BID SCHEDULE
$_ $185,578.00
Total Base Bid in Numbers
Rudy Hemandez Community Cente -16- 00 21 13 - INSTRUCTIONS TO BIDDERS Sym Flooring Replacement
The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work.

All blank spaces appearing above must be filled in. Failure to fill in any blank spaces may render the bid non-responsive. In case of discrepancy between the Unit Price and Item Cost set forth for a unit basis item, the Unit Price shall prevail and be utilized as the basis for determining the lowest responsive, responsible Bidder. However, if the amount set forth as a Unit Price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the Item Cost column, then the amount set forth in the Item Cost column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the Unit Price.

For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and any apparent errors in the addition of lump sum and extended prices.

The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the Unit Price.

The undersigned agrees that this Bid Schedule constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after the Bid opening, or until a Contract for the Work is fully executed by the City and a third party, whichever is earlier.

If the Contract Documents specify Alternate Bid items, the City can choose to include any, all, or none of the Alternate Bid items in the Work. If the City selects any of the Alternate Bid items, the corresponding Alternate Bid prices shall be added to or deducted from Base Bid Price for the Work. The City can award/select Alternate Bid items at any time(s).

Name of Bidder HUR FLOORING CO.

Signature
Name and Title MICHAEL S. HUR
Dated 4/30/2024
Rudy Hemandez Community Center -17- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement

BID GUARANTEE

BID BOND
[Note: Not required when other form of Bidder's Security, e.g. cash, certified check or cashier's check, accompanies Bid.]
The makers of this bond are, Hur Flooring Co _ as
Principal, and Contractors Bonding and Insurance Company _, as Surety and are held and firmly bound unto the CITY OF SAN BERNARDINO, with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to the City for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated May 1 2024, for Rudy Hernandez Community Center Gym Flooring Replacement.

If the Principal does not withdraw its Bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall affect its obligation under this bond, and Surety does hereby waive notice of any such changes.

In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys' fees, court costs, expert witness fees and expenses.

IN WTNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this 29th _day of April 2024 the name and corporate seal of each corporation.
(Corporate Seal) HUR FLOORING CO
Contractor/ Principal
By.

Title OwneR
Contractors Bonding and Insurance Company
(Corporate Seal) Surety
Aloney in Fact Pam Binns
(Attach Attorney-in-Fact Certificate) Title Attorney in-Fact -18- 00 21 13 - INSTRUCTIONS TO BIDDERS
Syn Hon eplacemenly Center
Notary Acknowledgment

STATE OF CALIFORNIA
COUNTY OF Kern
On April 29 2024, before me, Christine M. Stahl _ Notary Public, personally Nama And Tille Of Officer (eg. "Jane Doe, Notary Public) appeared Pam Binns, Attorney-in Fact _, who proved to me on the basis of satisfactory Namo(s) of Signer(s)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
! certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

CHRISTINE M. STAHL Y WITNESS my hand and official seal.

COMM. #2348826

NOTARY PUBLIC CALFORNIA A
KERN COUNTY rote M. Stele
Phy Comm. Exp. Feb. 24, 2026 H
Pface Notary Seal Above Signature of Notary Public

OPTIONAL
lough the information below is not required by law, it may prove valuable to persons relying on the docume. nd could prevent fraudulent removal and realtachment of this form to another docume

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT " Individual
" Corporate Officer
Title(s) Title or Type of Document
" Partners) Limited
General Number of Pages
" Attorney-ln-Fact
Guard/onservator Date of Document
igner is representing
ame Of Person(s) Or Entitylie
Signers) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

Rudy Hemandez Community Center -19- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement

POWER OF ATTORNEY
RLI Insurance Company
Contractors Bonding and Insurance Company
025 N. Lindbergh Dr. Peoria, IL. 6161
honc: 800-645-240
Know All Men by These Presents:

That this Power of Attomey is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired.

That RLI Insurance Company and/or Contractors Bonding and Insurance Company, cach an Illinois corporation, (separately and together, the "Company") do hereby make, constitute and appoint:

Ronald Burcham, Pam Binns, Michael F. Moore, Michael Hay, Mark Heyne, jointly or severally in the City of Califomia _its true and lawful Agents) and Altorney(s) in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all bonds and undertakings in an amount not to exceed
($25,000.000.00 _ for any single obligation.

The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon the Company as if such bond had been executed and acknowledged by the regularly elected officers of the Company.

RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have each further certified that the following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation, and is now in force, to-wit:
"All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate scal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorncy or other obligations of the corporation. The signature of any such officer and the corporate scal may be printed by facsimile." IN WITNESS WHEREOF, the RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have caused these presents to be executed by its respective Sr. Vice President with its corporate seal affixed this December 2023.

RLI Insurance Company
NCE C Contractors Bonding and Insujance Conpany
Hambin
SEAL By:

Eric Raudins Sr. Vice President
State of Illinois
y ss
County of Pcoria CERTIFICATE
On this 18th. day of December
Public, personally appeared
act and deed of said corporation.

By: i ta sent
Notary Public ontractors Bonding and Insurance Compar

JILL A SCOTT
Notary Public
State of Ohio
My Comm. Expires
September 22. 2025 Corporate Secretary
04403-0020212
A0058D19

DESIGNATION OF SUBCONTRACTORS
The subcontractor listed below will perform work or labor or render service to the contractor in or about the construction of the work or improvement, or are subcontractors licensed by the State of California who will, under subcontract to the contractor, specially fabricate and install a portion of the work or improvement according to detailed drawings contained in the Contract Documents, in an amount in excess of one-half of one percent (1/2 of 1%) of the contractor's total bid.

Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder's Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.

In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 (commencing at Section 4100), Part 1, Division 2 of the California Public Contract Code, the Bidder shall set forth below:
(a) The portion of the work to be done by the subcontractor; (b) The name and the location of the place of business; (c) The California contractor license number; and
(d) The DIR public works contractor registration number.

If a Bidder fails to specify a subcontractor or if a Bidder specifies more than one subcontractor for the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified to perform that portion of work and that it shall perform that portion itself.

Portion of CSLB DIR
Work to be Name of Location of Contractor Registration
done by Subcontractor Business License No. Number
Subcontractor
Rudy Hemandez Community Center -21- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement
•
Portion of CSLB DIR
Work to be Name of Location of Contractor Registration
done by Subcontractor Business License No. Number
Subcontractor
Rudy Hemandez Community Center -22- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement
Portion of CSLB DIR
Work to be Name of Location of Contractor Registration
done by Subcontractor Business License No. Number
Subcontractor
(Attach additional sheets if necessary)
Name of Bidder HUR FLOORING CO.

Signature
Name and Title MICHAEL S. HUR - Owner
Dated_4/30/2024
Rudy Hemandez Community Center -23- 00 21 13 - INSTRUCTIONS TO BIDDERS Gym Flooring Replacement

BIDDER INFORMATION AND EXPERIENCE FORM
A. INFORMATION ABOUT BIDDER
(Indicate not applicable ("N/A") where appropriate.)
NOTE: Where Bidder is a joint venture, pages shall be duplicated and information provided for all parties to the joint venture.

1.0 Name of Bidder: HUR FLOORING CO.

2.0 Type, if Entity: Individual

3.0 Bidder Address: 15204 Stag Street, Van Nuys, CA 91405 (818) 701-0785 (818) 700-4985
Facsimile Number Telephone Number
[email protected]
Email Address

4.0 How many years has Bidder's organization been in business as a Contractor? 33 Y

5.0 How many years has Bidder's organization been in business under its present name?
Under what other or former names has Bidder's organization operated? N/A

6.0 If Bidder's organization is a corporation, answer the following:

6.1 Date of Incorporation:

6.2 State of Incorporation:

6.3 President's Name: N/A

6.4 Vice-President's Name(s):

6.5 Secretary's Name:

6.6 Treasurer's Name:

Rudy Hemandez Community Center -24- 00 41 43 - BID FORMS Gym Flooring Replacement

7.0 If an individual or a partnership, answer the following:

7.1 Date of Organization: 01/1991

7.2 Name and address of all partners (state whether general or limited partnership):

N/A

8.0 If other than a corporation or partnership, describe organization and name principals:

MICHAEL S. HUR 100% OWNER AS AN INDIVIDUAL

9.0 List other states in which Bidder's organization is legally qualified to do business.

NEVADA

10.0 What type of work does the Bidder normally perform with its own forces?

DEMOLISH, INSTALL, REFINIS, RECOAT WOOD FLOORING

11.0 Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:

NO

12.0 Within the last five years, has any officer or partner of Bidder's organization ever been an officer or partner of another organization when it failed to complete a contract? If so, attach a separate sheet of explanation:

NO
Rudy Hemandez Community Center -25- 00 41 43 - BID FORMS Gym Flooring Replacement

13.0 List Trade References:

CONNOR SPORTS FLOORING

HOME DEPOT

ROYAL PLYWOOD

GALLEHER

14.0 List Bank References (Bank and Branch Address):

PACIFIC PREMIER BANK

ENCINO BRANCH

15.0 Name of Bonding Company and Name and Address of Agent:

RLI INSURANCE COMPANY

CONTRACTORS BONDING & INSURANCE COMPANY
CHRIS STAHL 661.316.5112 8500 STOCKDALE HWY, #200 BASKERSFIELD, CA 93311 [REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
Rudy Hernandez Community Center -26- 00 41 43 - BID FORMS Gym Flooring Replacement
B. LIST OF CURRENT PROJECTS (BACKLOG)
[**Duplicate Page if needed for listing additional current projects."*] Project Client Reference Description of Completion Date Cost of Bidder's (agency Bidder's Work Work
name/contact
info)
DUARTE Bernards 11/2024 $454,191.00
1818) 898-1521
Estanthia HS Fal wood flooring 5/2025 $115,355.00
Mount Eden Fal wood flooring 10/2024 $282,272.00
Corte madera Alter Construction, Inc F&l wood flooring 4/2024 $193,000.00 510: 234-4200
Seals Consiruction
Reedley Coliege F&i wood flooring 8/2024 $98,800.00
Center (559) 651-4040
Bernards F&i wood flooring
La Costa Canyon HS 3/2024 $72,880.00
(818) 898-1521 Refinish wood Fl
Rudy Hernandez Community Center -27- 00 41 43 - BID FORMS Gym Flooring Replacement
C. LIST OF COMPLETED PROJECTS - LAST THREE YEARS
[**Duplicate Page if needed for listing additional completed projects. **] Please include only those projects which are similar enough to demonstrate Bidder's ability to perform the required Work.

Project Client Reference Description of Completion Date Cost of Bidder's (agency Bidder's Work Work
name/contact
info)
Roosevelt HS BERNARDS 12/2023
818-898-1521 $90,924.00
CSULB-KIN EAST 2H CON. Furnish & Install 6/2023 $212,000.00 562-424-5567 wood flooring
A VALLE PINNER CON. urnish & Insta 7/2023
OLLEGE ood floorir $294,000.00
714-490-4000
WOODLAND CC LATHROP CON. Furnish & Insta 11/2023 $133,206.00 707-746-8000 vood flooring
BERKLEY HS ALTEN CON. Furnish & Instal 3/2023 $141,745.00 510-234-4200 vood flooring
HAYWARD HS C.OVERRA & CO. Irish & Inst 10/2022 $194,000.00 510-234-0926 od floori
CENTRAL HS HARRIS CON. Furnish & Install 7/2022 $344,366.00 559-251-0301 wood flooring
REEDLEY COLLEGE SEALS CON. urnish & Insta 8/2022 $288,900.00 559-651-4040 ood floorir
GLENDALE CC NAZARIAN GROUP Furnish & Install 3/2022 $202,620.00 818-990-5115 wood flooring
FERNANDO HS NAZARIAN GROUP urnish & Insta 12/2022 $135,199.00 818-990-5115 rood floorin
DIABLO VALLEY LATHROP CON. Furnish & Insta $293,000.00
COLLEGE 707-746-8000 vood floorin 12/2021
JOHN ADAMS MS BERNARDS urnish & Instal 7/2021 $249,000.00 818-898-1521 vood floorin
PALM SPRINGS HS BERNARDS 10/2021 $421,774.00
818-898-1521
BOGH ENGINEERING irish & Inst
FULLERTON HS 4/2021 $194,485.00
951-845-4607 od floori
Rudy Hernandez Community Center -28- 00 41 43 - BID FORMS Gym Flooring Replacement
D. EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE Personnel:

The Bidder shall identify the key personnel to be assigned to this project in a management, construction supervision or engineering capacity.

1. List each person's job title, name and percent of time to be allocated to this project:

MICHAEL S. HUR - Owner - PM 50% of time
ASHRAF RIZK - Sr.Estimating Engineer/ PM - 50% OF TIME
LIBRADO GARCIA- Superintendent- 100% of time

2. Summarize each person's specialized education:

MICHAEL S. HUR- Contractor
ASHRAF RIZK- Bachelor Of Engineering

LIBRADO GARCIA- JOURNEYMAN

3. List each person's years of construction experience relevant to the project:

MICHAEL S. HUR - 40 YEARS
ASHRAF RIZK - 30 YEARS
LIBRADO GARCIA- 15 YEARS

4. Summarize such experience:

MICHAEL S. HUR - Public and Private- demolish, Install, repair, Refinish, Recoat wood flooring ASHRAF RIZK- Public and Private, Design, Q.C, Q.A, PM all trades including wood flooring LIBRADO GARCIA- demolish, Install, repair, refinish, recoat wood flooring Bidder agrees that personnel named in this Bid will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the City.

Rudy Hernandez Community Center -29- 00 41 43 - BID FORMS Gym Flooring Replacement
E. ADDITIONAL BIDDER'S STATEMENTS:

If the Bidder feels that there is additional information which has not been included in the questionnaire above, and which would contribute to the qualification review, it may add that information in a statement here or on an attached sheet, appropriately marked:

Name of Bidder HUR FLOORING CO
Signature
Name and Title MICHAEL S. HUR
Dated 4/30/2024
Rudy Hernandez Community Center -30- 00 41 43 - BID FORMS Gym Flooring Replacement

NON-COLLUSION DECLARATION
The undersigned declares:

I am the OWNER of HUR FLOORING CO _ the party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 4/28/2024_ [date], at VAN NI [city], CALIFORNIA [state].

Name of Bidder_ HUR FLOORING CO.

Signature
Name and Title MICHAEL S. HUR - Owner
Dated 4/30/2024
Rudy Hernandez Community Center -31- 00 41 43 - BID FORMS Gym Flooring Replacement
IRAN CONTRACTING ACT CERTIFICATION.
(Public Contract Code section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor's status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:
• The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or (2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran. • The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

X The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:

Printed Name: MICHAEL S. HUR
Title: OWNER
Firm Name: HUR FLOORING CO.

Date: 04/30/2024
Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.
***INSERT PROJECT NAME***] -32- 00 41 43 - BID FORMS

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.

No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work.

Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.'
Name of Bidder: HUR FLOORING CO
DIR Registration Number: 1000006707
DIR Registration Expiration: 10/2024
Small Project Exemption: Yes or X_No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:

1. Bidder shall maintain a current DIR registration for the duration of the project.

2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Bidder HUR FLOORING CO.

Signature
Name and Title MICHAEL S. HUR - Owner
Dated 04/30/2024
CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION.

I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in ' recton 07255 and 71, the contador 8s in repons to Smal raged Exeriomal project exemption under Labor Code [***INSERT PROJECT NAME***] -33- 00 41 43 - BID FORMS
accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.

Name of Bidder HUR FLOORING CO.

Signature 2
Name and Title MICHAELS. HUR - Owner
Dated 04/30/2024
***INSERT PROJECT NAME***] -34- 00 41 43 - BID FORMS

FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractors) ("Fleet") is true and correct:
• The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto. • The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
• The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4). • The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.

Name of Bidder: HUR FLOORING CO
Signature:

Name: MICHAEL S. HUR
Title: OWNER
Date: 04/30/2024
***INSERT PROJECT NAME***] -35- 00 41 43 - BID FORMS
Gym Flooring Replacement Rudy C Hernandez Communi.

Q&A Deadline April 24, 2024 3:00 PM (PDT)
Set 1 Released via Email 04/25/2024 3:18 PM (PDT) - 4 questions What is the anticipated project schedule from start date to finish? Timing will be important when considering material lead times and labor availability.

Answer As mentioned in contract of construction article 2 within 90 calendar days.

1.2 Condition of concrete underneath the floor will not be known until existing floor is removed. Most old slabs need to be leveled to meet 1/8" in 10ft radius spec. How will this potential leveling be itemized in the bid? We recommend adding a defined allowance to cover this unknown cost. Please advise.

Answer Leveling is already included in bid item # 4

1.3 Spec says 1/4" or 1/2" foam or cushion pad. Please clarify exactly the thickness and if foam or cushioned pad Answer As a standard, the minimum thickness for cushion pads is 1/2" and for rolled foam is 1/4". Both will be accepted

1.4 1/2" maple is not currently being milled. Industry standard is 25/32". Please confirm 25/32" will be the specified thickness of maple.

Answer 25/32" will be accepted and preferred as it is more than 1/2" mas 4/8029

← All documents from this meeting