BID TABULATION FOR
PR 23-003, PROJECT NO. 13622 : SPEICHER PARK - EAST SIDE SKATE PARK BID OPENING: 04/23/24 @ 3:00PM
Item No. BID ITEM DESCRIPTION Estimated
Quantity Unit
BID SCHEDULE Unit Price Total Unit Price Total Unit Price Total SCHEDULE NO. 1 Speicher Park - East Side Skate Park PR 23-003

1.1 Mobilization 1 LS 63,343.66$ 63,343.66$ 170,000.00$ 170,000.00$ 107,000.00$ 107,000.00$

1.2 Stormwater Pollution and Prevention Plan and NDPES Compliance Per Plans and Specifications 1 LS 11,156.63$ 11,156.63$ 14,000.00$ 14,000.00$ 7,958.00$ 7,958.00$

1.3 Remove Existing Tree and Root Ball, Dispose 1 LS 19,789.16$ 19,789.16$ 5,000.00$ 5,000.00$ 3,319.38$ 3,319.38$

1.4 Sawcut and Remove Existing Mow Curb and Dispose Per Plans and Specifications 1 LS 3,101.20$ 3,101.20$ 1,300.00$ 1,300.00$ 1,472.00$ 1,472.00$

1.5 Remove Existing Fence/Gate, Associated Posts, Footings, ETC. and Dispose Per Plans and Specifications 1 LS 4,724.70$ 4,724.70$ 12,000.00$ 12,000.00$ 8,843.50$ 8,843.50$

1.6 Sawcut and Completely Remove Existing Concrete Pad, Base, ETC. and Dispose Per Plans and Specifications 1 LS 54,833.73$ 54,833.73$ 58,700.00$ 58,700.00$ 46,000.00$ 46,000.00$

1.7 Pothole and Locate Existing Underground Utility Lines to Protect in Place as Required Per Plans and Specifications 1 LS 1,148.19$ 1,148.19$ 6,600.00$ 6,600.00$ 6,426.00$ 6,426.00$

1.8 Remove Existing Landscape/Irrigation and Cap at Limits of Demolition, Dispose Removed Items Per Plans and Specifications 1 LS 4,590.36$ 4,590.36$ 6,700.00$ 6,700.00$ 3,248.75$ 3,248.75$

1.9 Construct Skate Park. All work to include Surveying and Staking Services, Base material, Concrete Work (Formwork, Reinforcement, Finishing and Curing), and Metal Work (Fabrication, Installation/welding, Painting, Signage and Drain Inlets), required for the construction of an approximate 12,270 SF. Concrete Skate Park. Per Plans and Specifications. 1 LS 616,544.58$ 616,544.58$ 727,000.00$ 727,000.00$ 959,698.00$ 959,698.00$

1.10 Construct Concrete Walk (Approx 1,200 SF.) Per Plans and Specifications 1 LS 30,559.04$ 30,559.04$ 13,500.00$ 13,500.00$ 17,112.00$ 17,112.00$

1.11 Construct and Install 42” Steel Tube Fencing Per Plans and Specifications 1 LS 67,831.33$ 67,831.33$ 48,900.00$ 48,900.00$ 55,200.00$ 55,200.00$

1.12 Install “No Dumping – Drains to Ocean” Medallion on Existing Catch Basins 2 EA 72.30$ 144.60$ 275.00$ 550.00$ 109.25$ 218.50$

1.13 Install Flogard +Plus Catch Basin Insert Filter (Or Approved Equal) per Plans and Specifications 2 EA 497.59$ 995.18$ 5,000.00$ 10,000.00$ 207.00$ 414.00$

1.14 COLD MILL 5" UNIFORM DEPTH - FULL STREET WIDTH PER PROJECT PLANS AND

SPECIFICATIONS
1 LS 6,154.22$ 6,154.22$ 6,300.00$ 6,300.00$ 8,496.20$ 8,496.20$

1.15 Install Landscape. Complete and in accordance with Contract Documents, including all plant materials (Marina Strawberry Tree, Agave Vilmoriniana Octopus Agave, Lantana X ‘New Gold’, Senecio Mandraliscae ‘Blue Chalk Sticks’) 1 LS 2,572.29$ 2,572.29$ 3,000.00$ 3,000.00$ 25,194.20$ 25,194.20$

1.16 Construct Raised Concrete Curb 6"-8" per detail C/PP2.01 120 LF 59.24$ 7,108.43$ 25.00$ 3,000.00$ 90.47$ 10,856.40$

1.17 Project Construction Sign 1 LS 1,412.69$ 1,412.69$ 900.00$ 900.00$ 10,603.00$ 10,603.00$ Total Base Bid
896,009.99$ 1,087,450.00$ 1,272,059.93$
Actual Amount - Recorded Amount -$ (0.20)$ ADDITIVE ALTERNATE NO. 1 -$

2.1 Slappy Curb Per Skate Park Plans 1 LS 4,265.06$ 4,265.06$ 3,000.00$ 3,000.00$ 5,875.00$ 5,875.00$

2.2 Entry Plaza w/ Decorative Paving (Approx. 930 SF.) & Seating Entry Plaza Planting & Irrigation 1 LS 60,518.07$ 60,518.07$ 53,750.00$ 53,750.00$ 82,248.00$ 82,248.00$

2.3 Shade Structure 1 LS 71,139.76$ 71,139.76$ 86,250.00$ 86,250.00$ 92,726.00$ 92,726.00$ Additive Alternate No. 1 SUBTOTAL 135,922.89$ 143,000.00$ 180,849.00$ TOTAL BID SCHEDULE 1,230,450.00$ 1,031,932.88$

APPARENT LOW BIDDER
GRINDLINE SKATE PARKS INC.
3RD LOW
C.S. LEGACY CONSTRUCTION,
INC.
2ND LOW

CALIFORNIA SKATE PARKS
1,452,908.93$