1. BID TABULATION
PROJECT NAME: Speicher Park Ballfields Improvements (Phase 1) PROJECT NO: 23.006
Apparent Low Bidder 1 Apparont Low Bidder 2
BID TABULATION
Bilbro Construction Company, Inc. Armstrong Cal Builders, Inc.
Bid Item and Description Quantity Unit Unit Price Total Price Unit Price Total Price
1.1 Mobilzation, Insurance, Demobilization LS 66.756.93 S66,756.90 S 500.140,00 $SCO, 140.00 Construction Safely, Traffic Control, Daily Cleanup, & Construction Best $35,756.90 S35,000.00
1.2| LS 36,756,93 $ 35,000,00
Management Practices
1.3 Construction Staking, Survey, Lines & Grade LS 28,756.93 $28,756.90 $20,000.00 Remove Existing Concrete Pavement 2,950 $ 15.31 $45,164.50 $14,160.00 | Remove Existing Asphalt Pavement and Base SF 13,450 $ 5.41 S72,764.50 3.60 $48.420.00 2,3 Remove Existing Earth/Turf in Preparation for Site Improvements SF 360 51.77 $18.637.20 6.00 $2,100.00 Remove Existing Infield Mix 28,630 S 1.12 S32,065.60 IS 0.84 824.049.20
2.5 kemove exisang lur in Preparaton tor kegrading SF 86,795S 0.70 S60,756.50 1,20 $104.154.00
2.6 Remove Existing Concrete Curb LF 65 307.95 $20,016.75 $ 7.20 $468.00 kemove existing Drinking Fountain and Concrete Fac 9,068.16 S18.138,92 480.00 $060,00 2,8 Remove existing Swing Gate EA 17,101.93 S17.101,90 9.60 $9,60
2.9 Remove existing Bollard and Footing 2,907.82 S17,46.92 S 300.00 $1,800.00
2.10 | Remove Existing Concrete Remo EA 18,136,93 S18,136.90 480,00 $480.00
2.11 Construct 4" Asphalt Concrete over 6" Aggregate Base 5,880 7.70 $45,276.00 9.60 $56,448.00
2.12 Construct 4° Concrete Pavement 9,510 $ 11.98 $113.929.80 26.40 | $251.064.00
2.13 Construct Type A Concrete Curb 80 323.59 $25,887,20 48.00 $3,840,00
2.14 Construct Concrete Curb Ramp 310 75.41 $23,377.10 40,80 $12.648.00 2,15 Purish a Install cast-n-Mace Delectable warning Surlace, Color Yellow EA 2,666,73 $5.333.46 960,00 $1,920.00 2,16 Construct Type B1-5 Mountable Curb LF 55 152.97 | S8.413.35 54,00 $2,970.00
2.17 Construct Accessible Concrete Ramp SF 215 51.23 $11.014,45 48.00 $10.320.00
2.18 Construct Concrete Wheel Stop EA 523.91 S33143.46 000000/00 420.00 $2.520.00 Paint 4 wide wine Strpe 44.91 $3,143.70 6.00 $420.00
2.20 Paint Accessible Striping and Markings 4,459.49 S28.756.94 11 360.00 $2,160.00
2.21 Install Standard Accessible Parking Sign. Post, and Footing 6.885.64 $20,656.92 960.00 $2.880.00
2.22 Furnish & Install Van Accessible Parking Sign. Post, and Footing EA 6,885.64 $20,656.92 4000c0 co 1,080.00 $3.240.00
2.23 Furnish & Install 12' Square NDS Catch Basin or Approved Equal 8.750.96 $17,501.92 960.00 $1,920.00 Furnish & Install 6' PVC SCH 40 Pipe with Trenching and Backfill 263.25 $25.008.75 28,00 $2.660.00 Core Cut Hole and Form Minimum Opening of 8*. Securely Fasten 6" × 1" 1,200,00
2.25 EA 18,446.93 S18,446.96 $1,200.00
stub into Hole with Cement Mortar
Earthwork/Grading: Perform Grade Cut CY 768 42.56 $32,666.08 26.40 $20.275.20
2.27 Earthwork/Grading: Perform Grade Fill 234 175.99 S41,181.68 21.60 $5,054.40
2.28 Earthwork/Grading: Perform Net Export 534 200.01 S106.805,34 90.00 $48.050.00 Furnish & Install Below-Grade Gopher Bamier Mesh 97,433 S 1,79 $174,405.07 40/1 0.42 | $40.921.86
3.2 Furnish & Install Synthetic Turf "Green' & Synthetic Turf 'Brown' 97,780 6,56 $641,436.80 IS 10.07 5984,644.60 17,344 S 2.62 $45,441.28 3,60 $62,438.40
3,4 Furnish & Install New Irrigation/Synthetic Turf Cooling System SF 95,698 S 0,56 $53.585.28 1.80 $172.238.40 Furnish & Install Irrigation Controller at Huchabaa Electrical Power 18,946,93 $18.948.93
3.5 EA 5,400,00 $5,400.00
Furnish & Install Irrigation Controller at Huchabaa Electrical Power 18,946.93 $18.946,90 $ 5,400.00 $5,400,00 EA
3.7 Remove & Replace Drinking Fountains; Connect to Existing Piping EA 17,568.46 $35.138,92 7,800.00 $15.000.00 Furnish & Install Trash Receptacles EA 5,475.48 $21,901.92 840.00 $3,300.00
4.1 Furnish & Install Underground Conduit and Wire to Scoreboard for LF 650 40.93 $26,604.50 98.40 $63.960.00 Huchabaa Field, Including Trenching & Backfill
4.2 Remove Pavement Surfaces Associated with Electrical Trenching. LF 100 205.17 $20,517.00 48,00 $4,800.00 Replace in Kind After Trenching & Backfill is Complete
5.1 Renovation of Existing Concessions/Restroom Building, Complete LS 301,608.46 5301608.46 $ 548,280,00 $548,280.00 including Architectural, Structural, Mechanical Electrical. & Plumbing
5.2 Demclish (E) Scorebooth Pad 225 80.21 $18,047.25 6.00 $1,350.00 5,3 Install 15'x15' Accessible Concrete Pad w/ Ramp & Hand/Guard Rails 225 121.05 $27.236.25 50.40 $11,340,00 Demclish (E) Fence Including Footings 1570 23.76 $37.517.04 1.68 $2.652.72 Furnish & Install New Wrought Iron Fence wi (1) Gate Complete wi 138.00
5.5 114.23 $180,369.17
Footings
Furnish & Install (1) Batter's Eyes - Jaypro Sports #8E-24 (Or Equal) $ 51,600.00
5.6 EA 45,243.46 $45.243.46
Complete wi Footings
Furnish & Install (1) Wireless Scoreboard with (2) 14'-6° Poles and
5.7 LS 27,316.93 S27,316.96
Footings
Remove (15) Existing Bleachers 6,275.64
Furnish & Install (2) New Concrete Pads for Bleachers - 21-0" × 14-7 1/2 SF 630 40,28
5.0 Fumiah & Instal 2) Now Srow 21-0° Long ADA Bleachers - Butte EA 2
Bleachers #BRB-0521AADA (Or Equal)
5,11 Furnish & Install (2) New 5-row 21-0" ADA Bleachers LS Demo and Remove Backstop Chainlink & Netti SF 240 8.10 4.80 1 Furnish & Install New heavy gauge chainlink at (1) backst SF 240 IS 67.20 Furnish & Install New topper w corrugated plastic tubing at existing LF 1,579 $ 10.80 EA
Footings & Pads
6.1 Provide All Other Work Not Listed Abave But Required by Plans & Specifications
BAD RANKING
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES