1. BID TABULATION
PROJECT NAME: IMPROVEMENTS AT RUBEN CAMPOS COMMUNITY CENTER PROJECT NO: GB 25-007
Apparent Low Bidder 1

BID TABULATION
Perfection Painting Corp
Bid Item and Description Quantity Unit Unit Price Total Price 1 Mobilization - LS 4,000.00 $4,000.00
Remove existing fixtures (toilets, sinks, urinals) in Men's and Women's 10 EA $ 100.00 $1,000.00 restrooms
Remove existing weight mats, punch bags, and their supports/fixtures. Clea 1 LS $ 8,000.00 $8,000.00 e GYM floor before the installation of the new weight mal 4 Not uses $0.00
4 EA 2,000.00 $8,000.00
6 Remove the related fan coils from the attic 4 EA 2.00.00 $8,000.00 Remove existing asphalt walkway, and ADA asphalt path of travel per plan 1,100 SF 20.00 $22,000.00 Remove existing PCC pad/ walkway at west entrance of the building per plan 338 SF $ 100.00 $33,800.00 9 4 $ 500.00 $2,000.00
Remove/cut 4 feet of existing fence and curb to allow for ADA path of travel.

Remove existing drinking water fountain and cap water line 1 EA 600.00 $600.00 11 Furnish and install new restroom fixtures (toilets, sinks, urinals).Use Kohler 10 EA 70.00 $700.00 brand fixtures.
12 Furnish paint; Patch and paint restroom walls (men's and women's LS $ 16,000.00 $16,000.00 restrooms).Submit type of paint for approval by the city Furnish and install new weight mats on top of the existing floor(2700 sq. ft.) 13 Use "Greatmats" brand, 3/8 inch x 4 ft. wide with blue dots. See attached 1 LS $ 5,000.00 $5,000.00 picture. Re-install the support/fixtures for the punch bags. 14 Install new ac condenser units on the roof, including supporting equipment. 4 EA 2,000.00 $8.000.00 Condenser units are provided by the City of San Bernardino (maintenance) 15 Furnish and install new fan coils in the attic. Match to existing controls/system 4 EA 6.000.00 $24.000.00 Construct 4" thick PCC walkway (ADA path), including 95% subgrade 16 1450 100.00 $145,000.00
compaction per plan and specifications. Use concrete class 560-C-3250 17 Furnish and install new fence- post to support the fence LS 2.000.000 $2,000.00 18 Patch/ repair curb/ gate-post base (see attached picture) LS 3,000.00 $3,000.00 Remove existing double doors on the south and west side of the building, and install new ADA compliant double doors, with panel bars and door closures, $ 10,000.00 $20,000.00 19 including doorbell & wiring. Submit door data sheets to the City for approval. 2 EA Doors to be vandal proof.

Apply 4" wide thermoplastic reflective white Striping, and blue borders for 20 Handicap path per 2023 Caltrans Standard A90A per specification and LS 5,000.00 $5,000.00 Project Plans.
21 Construction 4' x 8' project sign -- EA 3,000.00 $3,000,00 22 Furnish paint, and paint men's and women's restroom floors with epoxy paint. LS 8.000.00 $8,000.00 BID RANKING Apparent Low Bidder 1
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES $327,100.00

TOTAL BID AMOUNT INDICATED BY BIDDER
LANATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID $327,100.00 S: ENGINEERING|RFCA's 12025 AI1.15.2025 \Award Ruben Campos Community Center)Ruben Campos Bid AnalysisBID TABULATION 1 of1