Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Mobilization 1 LS $ 546,000.00 $ 546,000.00 200,000.00$ 200,000.00$ $ 242,180.00 $ 242,180.00 340,000.00$ 340,000.00$ 392,000.00$ 392,000.00$ 100,000.00$ 100,000.00$ 2 Traffic Control 1 LS 183,000.00$ $ 183,000.00 65,000.00$ 65,000.00$ 424,000.00$ $ 424,000.00 314,000.00$ 314,000.00$ 305,000.00$ 305,000.00$ 178,150.00$ 178,150.00$ 3 Clearing and Grubbing and BMPs 1 LS 319,000.00$ $ 319,000.00 100,000.00$ 100,000.00$ 301,000.00$ $ 301,000.00 40,000.00$ 40,000.00$ 405,000.00$ 405,000.00$ 100,000.00$ 100,000.00$ 4 Construct PCC Curb & Gutter per City of San Bernardino Stanadard 200, Type B to Match Exisiting; Mill All Curb Cuts1,200 LF 57.00$ $ 68,400.00 105.00$ 126,000.00$ 55.00 $ $ 66,000.00 92.00$ 110,400.00$ 57.25 $ 68,700.00$ 105.00$ 126,000.00$ 5 Construct PCC Curb per City of San Bernardino Standard 200, Type A to Match Exisiting; Mill All Curb Cuts 500 LF 45.00$ $ 22,500.00 80.00$ 40,000.00$ 44.00 $ $ 22,000.00 75.00$ 37,500.00$ 45.75 $ 22,875.00$ 65.00 $ 32,500.00$ 6 Construct PCC Curb Access Ramp With 3'x4' Cast-In-Place Truncated Dome Surface, Min 5' Transition Panels, Curb & Gutter and AC Slot Patch per SPPWC 111-5 45 EA 5,700.00$ $ 256,500.00 9,170.00$ 412,650.00$ 5,550.00$ $ 249,750.00 8,000.00$ 360,000.00$ 5,800.00$ 261,000.00$ 9,300.00$ 418,500.00$ 7 Construct PCC Curb Access Ramp With 3'x4' Cast-In-Place Truncated Dome Surface, Min 5' Transition Panels, Curb & Gutter, PCC Spandrel and AC Slot Patch per SPPWC 111-5 and City Standard Dwg 201 60 EA 8,000.00$ $ 480,000.00 9,000.00$ 540,000.00$ 7,777.00$ $ 466,620.00 10,350.00$ 621,000.00$ 8,100.00$ 486,000.00$ 16,500.00$ 990,000.00$ 8 Construct PCC Sidewalk, Bypass and/or Transition Panel Over Subgrade Compacted to 95% Relative Compaction per City of San Bernardino Standard 202; Mill All Curb Cuts 1,700 SF 11.30$ $ 19,210.00 22.00$ 37,400.00$ 11.00 $ $ 18,700.00 23.00$ 39,100.00$ 11.50 $ 19,550.00$ 18.00 $ 30,600.00$ 9 Construct 8' PCC Cross 6 Feet Gutter Over Subgrade per City of San Bernardino Standard No. 201; Mill All Curb Cuts3,500 SF 24.70$ $ 86,450.00 30.00$ 105,000.00$ 24.00 $ $ 84,000.00 37.00$ 129,500.00$ 25.00 $ 87,500.00$ 42.00 $ 147,000.00$ 10 Remove and Replace the Exisiting Drainage CMP and / or the Exisiting Concrete Decking with a New One as per Detail A200 SF 220.00$ $ 44,000.00 190.00$ 38,000.00$ 225.00$ $ 45,000.00 200.00$ 40,000.00$ 225.00$ 45,000.00$ 225.00$ 45,000.00$ 11 Adjust Utility Manholes Cover to Grade 80 EA 1,550.00$ $ 124,000.00 1,525.00$ 122,000.00$ 1,600.00$ $ 128,000.00 1,540.00$ 123,200.00$ 1,575.00$ 126,000.00$ 1,400.00$ 112,000.00$ 12 Cold Mill 2" Uniform Depth - Full Street Width per Project Specifications 1,000,000 SF 0.29$ $ 290,000.00 0.40$ 400,000.00$ 0.44 $ $ 440,000.00 0.45$ 450,000.00$ 0.43 $ 430,000.00$ 0.45 $ 450,000.00$ 13 Cold Mill 1 1/2" Uniform Depth - Full Street Width per Project Specifications 95,000 SF 0.29$ $ 27,550.00 0.39$ 37,050.00$ 0.33 $ $ 31,350.00 0.40$ 38,000.00$ 0.33 $ 31,350.00$ 0.45 $ 42,750.00$ 14 Cold Mill 3" Uniform Depth / Full Street Width per Project Specifications 100,000 TN 0.34$ $ 34,000.00 0.52$ 52,000.00$ 0.66 $ $ 66,000.00 0.70$ 70,000.00$ 0.75 $ 75,000.00$ 0.80 $ 80,000.00$ 15 AC Overlay Per Project Specifications 16,000 EA 94.00$ $ 1,504,000.00 119.45$ 1,911,200.00$ 114.00 $ $ 1,824,000.00 112.00$ 1,792,000.00$ 117.50 $ 1,880,000.00$ 125.00 $ 2,000,000.00$ 16 Replace Exisiting Traffic Loop Detector Complete in Place per Caltrans Standard ES-5B, and Project Specifications 20 LS 810.00$ $ 16,200.00 725.00$ 14,500.00$ 1,500.00$ $ 30,000.00 720.00$ 14,400.00$ 725.00$ 14,500.00$ 800.00$ 16,000.00$ 17 Install Thermoplastic Traffic Striping, Signage, Pavement Messages, Pavement Marking, Crosswalks and Glue Down RPM's Complete In Place per Caltrans Standard A20A, A20B, A24E and Specifications 1 EA 70,000.00$ $ 70,000.00 69,155.00$ 69,155.00$ 77,000.00$ $ 77,000.00 69,000.00$ 69,000.00$ 70,500.00$ 70,500.00$ 70,000.00$ 70,000.00$ 18 Install City Furnished Solar Powered Radar Speed Feedback Sign on Exisiting Pole 4 EA 1,030.00$ $ 4,120.00 3,000.00$ 12,000.00$ 1,600.00$ $ 6,400.00 2,560.00$ 10,240.00$ 2,575.00$ 10,300.00$ 1,000.00$ 4,000.00$ 19 Furnish and Install Speed Feedback Sign on Contractor Furnished Pole 1 EA 11,300.00$ $ 11,300.00 16,000.00$ 16,000.00$ 8,500.00$ $ 8,500.00 12,500.00$ 12,500.00$ 12,600.00$ 12,600.00$ 15,000.00$ 15,000.00$ 20 Install City Furnished Flashing Beacons on Contractor Furnished and Installed Poles 2 EA 7,700.00$ $ 15,400.00 7,400.00$ 14,800.00$ 8,500.00$ $ 17,000.00 6,100.00$ 12,200.00$ 6,200.00$ 12,400.00$ 10,000.00$ 20,000.00$ 21 Remove Poles and Signs and All Attached Equipment 2 EA 1,030.00$ $ 2,060.00 2,100.00$ 4,200.00$ 5,250.00$ $ 10,500.00 2,000.00$ 4,000.00$ 2,100.00$ 4,200.00$ 1,000.00$ 2,000.00$ 22 Install Rectangular Rapid Flashing Beacon (RRFB) System with Advanced Flashers (Two Flashers at the Crosswalk and Two Flashers in Advance)1 EA 60,000.00$ $ 60,000.00 70,000.00$ 70,000.00$ 46,000.00$ $ 46,000.00 59,000.00$ 59,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 23 Remove Exisiting Tree and Roots 1 EA 8,800.00$ $ 8,800.00 9,400.00$ 9,400.00$ 10,000.00$ $ 10,000.00 8,600.00$ 8,600.00$ 8,750.00$ 8,750.00$ 9,500.00$ 9,500.00$ 24 Project Construction Signs per Active Construction Location 2 TN 4,100.00$ $ 8,200.00 1,300.00$ 2,600.00$ 5,000.00$ $ 10,000.00 2,650.00$ 5,300.00$ 11,000.00$ 22,000.00$ 3,000.00$ 6,000.00$ 25 Remove Exisiting and Construct up to 4" Depth Pavement Repair, Where Needed (Quantity is an allowance to be used where directed; actual quantity will vary) 1,000 TN 145.00$ $ 145,000.00 278.18$ 278,180.00$ 220.00 $ $ 220,000.00 233.00$ 233,000.00$ 300.00 $ 300,000.00$ 235.00 $ 235,000.00$ 26 Remove Exisiting and Construct New Parkway Culvert Concrete Decking Including Constructing the Inlet and the Outlet Openings with Modified Depression as per the City Modified Standard Drawing #400, and Detail A 300 SF 295.00$ $ 88,500.00 165.00$ 49,500.00$ 300.00$ $ 90,000.00 153.00$ 45,900.00$ 298.00$ 89,400.00$ 300.00$ 90,000.00$ 27 Consturct Concrete Sidewalk Corner (Panels and Curb) with Maximum Slope of 2.0% and to be Matched with the Existing Surrounding Levels, Without Any Changes in the Elevation, Cast in Place Federal Yellow Truncated Dome, and Rebuilding of Circular Drain Lid as Per SPPWC 111-5, and Detail B2 EA 8,200.00$ $ 16,400.00 15,000.00$ 30,000.00$ 8,000.00$ $ 16,000.00 30,000.00$ 60,000.00$ 8,325.00$ 16,650.00$ 10,000.00$ 20,000.00$ Apparent Low Bidder
1 Apparent Low Bidder
2 Apparent Low Bidder
3 Apparent Low Bidder
4 Apparent Low Bidder
5 Apparent Low Bidder
6 $4,450,590.00 $4,756,635.00 $4,950,000.00 $5,038,840.00 $5,256,275.00 $5,400,000.00 $4,450,590.00 $4,756,635.00 $4,950,000.00 $5,038,840.00 $5,256,275.00 $5,400,000.00 A1. For Bid
Items 13 &
14 Cold Mill (1 1/2" and 3") Uniform / Full Depth - Full Street Width and Haul to the Olympic Pool located Adjacent to Norton Recreation Center including Leveling and 12 Weep Holes for Drainage 1,355 CY 53.00$ 71,815.00$ 69.00 $ 93,495.00$ 50.00 $ 67,750.00$ 71.00 $ 96,205.00$ 63.75 $ 86,381.25$ 135.00$ 182,925.00$ $71,815.00 $93,495.00 $67,750.00 $96,205.00 $86,381.25 $182,925.00 B1. Utility Standby Time (Per the City) 1 MONTH 8,300.00$ 8,300.00$ 128,000.00$ 128,000.00$ 55,000.00$ 55,000.00$ 16,000.00$ 16,000.00$ 28,500.00$ 28,500.00$ 10,000.00$ 10,000.00$ B2. Construct PCC Curb Access ramp With 3'x4' Cast-In-Place Truncated Dome Surface, Min 5' Transition Panels, Curb & Gutter, PCC Spandrel and AC Slot Patch per SPPWC 111-5 and City Standard Dwg 201 8 EA 8,200.00$ 65,600.00$ 14,000.00$ 112,000.00$ 8,000.00$ 64,000.00$ 15,700.00$ 125,600.00$ 8,350.00$ 66,800.00$ 16,500.00$ 132,000.00$ B3. Cold Mill 2" Uniform Depth - Full Street Width per Project Specifications 105,000 SF 0.27$ 28,350.00$ 0.41$ 43,050.00$ 0.44$ 46,200.00$ 0.50$ 52,500.00$ 0.50$ 52,500.00$ 0.45$ 47,250.00$ B4. AC Overlay per Project Specifications 1,300 TN 97.00$ 126,100.00$ 119.45$ 155,285.00$ 110.00$ 143,000.00$ 122.00$ 158,600.00$ 142.00$ 184,600.00$ 125.00$ 162,500.00$ $228,350.00 $438,335.00 $308,200.00 $352,700.00 $332,400.00 $351,750.00 $4,750,755.00 $5,288,465.00 $5,325,950.00 $5,487,745.00 $5,675,056.25 $5,934,675.00 TOTAL TOTAL $0.00 TOTAL $0.00 TOTAL $0.00 TOTAL $0.00 TOTAL

SUBCONTRACTORS

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

IS THE BIDDER QUALIFIED BASED ON REFERENCE PROJECTS

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT

ALTERNATE

ADDITIVE TOTAL
BASE BID + ALTERNATVE + ADDITIVE TOTAL
Apparent Low Bidder 4Apparent Low Bidder 3
Onyx Paving Company, Inc

BID TABULATION
PROJECT NAME: PAVEMENT REHABILITATION AT FOURTEEN LOCATIONS PROJECT NO: 13630
Bid Item and Description
Apparent Low Bidder 1
Matich Corporation

BID TABULATION

ADDITIVE

ALTERNATE TOTAL
Apparent Low Bidder 6
Hardy & Harper, Inc.

Apparent Low Bidder 5
Calmex Engineering, Inc.

Apparent Low Bidder 2
Copp Contracting, Inc. All American Asphalt

BID RANKING
SUBCONTRACTOR % AND AMOUNT SHOWN IN THE BID
DID THE BIDDER MEET MAX 49% SUB CONTRACTOR (MIN 51% WORK BY PRIME CONTRACTOR) REQUIREMENT

TOTAL BID AMOUNT INDICATED BY BIDDER