Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Mobilization LS 1 55,000.00$ 55,000.00$ 120,000.00$ 120,000.00$ 78,759.00$ 78,759.00$ 181,488.00$ 181,488.00$ 198,000.00$ 198,000.00$ 138,557.00$ 138,557.00$ 148,050.00$ 148,050.00$ $131,407.71 $131,407.71 $55,000.00 $198,000.00 2 Grading, Clearing And Grubbing LS 1 30,000.00$ 30,000.00$ 10,000.00$ 10,000.00$ 11,500.00$ 11,500.00$ 68,173.00$ 68,173.00$ 85,400.00$ 85,400.00$ 253,194.00$ 253,194.00$ 113,210.00$ 113,210.00$ $81,639.57 $81,639.57 $10,000.00 $253,194.00 3 Traffic Control LS 1 2,000.00$ 2,000.00$ 76,500.00$ 76,500.00$ 18,000.00$ 18,000.00$ 12,342.00$ 12,342.00$ 38,500.00$ 38,500.00$ 27,556.00$ 27,556.00$ 5,610.00$ 5,610.00$ $25,786.86 $25,786.86 $2,000.00 $76,500.00 4 Erosion Control Plan & BMPs LS 1 7,000.00$ 7,000.00$ 45,000.00$ 45,000.00$ 12,500.00$ 12,500.00$ 18,898.00$ 18,898.00$ 7,200.00$ 7,200.00$ 40,000.00$ 40,000.00$ 16,830.00$ 16,830.00$ $21,061.14 $21,061.14 $7,000.00 $45,000.00 5 Remove And Dispose Existing A.C. Pavement SF 14500 3.00$ 43,500.00$ 6.68$ 96,860.00$ 3.50$ 50,750.00$ 2.50$ 36,250.00$ 1.75$ 25,375.00$ 3.88$ 56,260.00$ 3.36$ 48,720.00$ $3.52 $51,102.14 $1.75 $6.68 6 Remove And Dispose Existing Chain Link Fence, Privacy Slats, And Gates LF 520 10.00$ 5,200.00$ 14.57$ 7,576.40$ 27.00$ 14,040.00$ 11.00$ 5,720.00$ 140.00$ 72,800.00$ 16.00$ 8,320.00$ 19.35$ 10,062.00$ $33.99 $17,674.06 $10.00 $140.00 7 Remove And Dispose Existing P.C.C. Curb LF 130 15.00$ 1,950.00$ 13.61$ 1,769.30$ 46.00$ 5,980.00$ 14.20$ 1,846.00$ 71.00$ 9,230.00$ 12.00$ 1,560.00$ 12.95$ 1,683.50$ $26.39 $3,431.26 $12.00 $71.00 8 Remove And Dispose Existing P.C.C. Cross Gutter SF 320 10.00$ 3,200.00$ 11.51$ 3,683.20$ 17.00$ 5,440.00$ 7.50$ 2,400.00$ 32.00$ 10,240.00$ 10.00$ 3,200.00$ 15.32$ 4,902.40$ $14.76 $4,723.66 $7.50 $32.00 9 Construct 0.46' Type A H.M.A. Pavement Over 0.5' Class 2 Aggregate Base Over 12" 95% Compacted Subgrade Ton 400 270.00$ 108,000.00$ 181.82$ 72,728.00$ 245.00$ 98,000.00$ 287.00$ 114,800.00$ 450.00$ 180,000.00$ 353.00$ 141,200.00$ 134.64$ 53,856.00$ $274.49 $109,797.71 $134.64 $450.00 10 Construct 6" Type "C" P.C.C. Curb And Gutter Per City Of San Bernardino Std Dwg 200 LF 500 48.00$ 24,000.00$ 73.01$ 36,505.00$ 48.00$ 24,000.00$ 75.10$ 37,550.00$ 365.00$ 182,500.00$ 50.00$ 25,000.00$ 56.10$ 28,050.00$ $102.17 $51,086.43 $48.00 $365.00 11 Relocate Existing Fence And Man Gate LF 270 18.00$ 4,860.00$ 44.00$ 11,880.00$ 50.00$ 13,500.00$ 118.00$ 31,860.00$ 500.00$ 135,000.00$ 227.00$ 61,290.00$ 207.57$ 56,043.90$ $166.37 $44,919.13 $18.00 $500.00 12 Adjust To Grade Existing Sewer Cleanout EA 2 500.00$ 1,000.00$ 450.00$ 900.00$ 1,380.00$ 2,760.00$ 991.00$ 1,982.00$ 925.00$ 1,850.00$ 1,470.00$ 2,940.00$ 1,075.44$ 2,150.88$ $970.21 $1,940.41 $450.00 $1,470.00 13 Adjust To Grade Existing Water Meter Box. EA 1 500.00$ 500.00$ 450.00$ 450.00$ 920.00$ 920.00$ 1,030.00$ 1,030.00$ 950.00$ 950.00$ 988.00$ 988.00$ 1,075.00$ 1,075.00$ $844.71 $844.71 $450.00 $1,075.00 14 Adjust To Grade Existing Irrigation Control Valve Box EA 1 500.00$ 500.00$ 450.00$ 450.00$ 920.00$ 920.00$ 933.00$ 933.00$ 950.00$ 950.00$ 1,800.00$ 1,800.00$ 987.00$ 987.00$ $934.29 $934.29 $450.00 $1,800.00 15 Construct 6" Type "A" P.C.C. Curb Per City Of San Bernardino Std Dwg 200 LF 130 40.00$ 5,200.00$ 69.01$ 8,971.30$ 33.00$ 4,290.00$ 63.00$ 8,190.00$ 675.00$ 87,750.00$ 50.00$ 6,500.00$ 50.49$ 6,563.70$ $140.07 $18,209.29 $33.00 $675.00 16 Construct P.C.C. Pad For Proposed 14' X 54' Kennel Per Kennel Plans, Finish Surface Elevation As Noted On The Grading Plans. CY 130 250.00$ 32,500.00$ 732.20$ 95,186.00$ 315.00$ 40,950.00$ 1,007.00$ 130,910.00$ 225.00$ 29,250.00$ 400.00$ 52,000.00$ 1,985.94$ 258,172.20$ $702.16 $91,281.17 $225.00 $1,985.94 17 Construct P.C. Pad For Proposed 24' X 60' Kennel Per Kennel Plans, Finish Surface Elevation As Noted On The Grading Plans. CY 45 700.00$ 31,500.00$ 732.20$ 32,949.00$ 320.00$ 14,400.00$ 709.00$ 31,905.00$ 1,050.00$ 47,250.00$ 400.00$ 18,000.00$ 2,782.56$ 125,215.20$ $956.25 $43,031.31 $320.00 $2,782.56 18 Construct P.C.C. Pad For Proposed 20' X 60' Kennel Per Plans, Finish Surface Elevation As Noted On The Grading Plans. CY 55 480.00$ 26,400.00$ 732.20$ 40,271.00$ 320.00$ 17,600.00$ 2,005.00$ 110,275.00$ 900.00$ 49,500.00$ 400.00$ 22,000.00$ 2,737.68$ 150,572.40$ $1,082.13 $59,516.91 $320.00 $2,737.68 19 Construct P.C.C. Sidewalk Per City Of San Bernardino Std Dwg 202, Case A. Width Per Plan. 2% Max Cross Slope
SF 1800 13.00$ 23,400.00$ 29.31$ 52,758.00$ 14.20$ 25,560.00$ 28.50$ 51,300.00$ 53.00$ 95,400.00$ 40.00$ 72,000.00$ 23.56$ 42,408.00$ $28.80 $51,832.29 $13.00 $53.00 20 Relocating Existing Sign and Bollards LS 1 1,000.00$ 1,000.00$ 12,000.00$ 12,000.00$ 2,710.00$ 2,710.00$ 4,194.00$ 4,194.00$ 2,850.00$ 2,850.00$ 8,000.00$ 8,000.00$ 19,635.00$ 19,635.00$ $7,198.43 $7,198.43 $1,000.00 $19,635.00 21 Construct 3' Wide P.C.C. Cross Gutter Per City Of San Bernardino Std Dwg 201. Tie Into Existing Cross Gutter As Shown In The Grading Plan
SF 170

25.00$ 4,250.00$ 23.67$ 4,023.90$ 37.00$ 6,290.00$ 37.00$ 6,290.00$ 385.00$ 65,450.00$ 25.00$ 4,250.00$ 78.54$ 13,351.80$ $87.32 $14,843.67 $23.67 $385.00 22 Construct 3' Curb End Transition Per City Of Highland Std Dwg 204. EA 3 2,000.00$ 6,000.00$ 2,500.00$ 7,500.00$ 1,100.00$ 3,300.00$ 700.00$ 2,100.00$ 385.00$ 1,155.00$ 1,500.00$ 4,500.00$ 1,346.40$ 4,039.20$ $1,361.63 $4,084.89 $385.00 $2,500.00 23 Furnish And Install HL33 HVY. Angle Bracket By Simpson @72” O.C. Attached W/ Two Bolts As Per The Plans And Data Sheet. EA 230

17.00$ 3,910.00$ 33.54$ 7,714.20$ 48.00$ 11,040.00$ 65.00$ 14,950.00$ 75.00$ 17,250.00$ 50.00$ 11,500.00$ 56.10$ 12,903.00$ $49.23 $11,323.89 $17.00 $75.00 24 Furnish, Install, Connect And Complete In Place 4” SDR 26 Pipe For The Drain Connection For The Kennels Including Clean-Out Points As Per The Specifications Including The Trenching Cut And Fill Works As Per The City Standard Drawing #310
LF 650 65.00$ 42,250.00$ 106.21$ 69,036.50$ 265.00$ 172,250.00$ 121.00$ 78,650.00$ 75.50$ 49,075.00$ 281.00$ 182,650.00$ 140.21$ 91,136.50$ $150.56 $97,864.00 $65.00 $281.00 25 Furnish, Install, Connect And Complete In Place The Water Connection Per Building And Safety Requirements For The Kennels.

LF 250 65.00$ 16,250.00$ 106.21$ 26,552.50$ 177.00$ 44,250.00$ 140.00$ 35,000.00$ 22.00$ 5,500.00$ 680.00$ 170,000.00$ 282.99$ 70,747.50$ $210.46 $52,614.29 $22.00 $680.00 26 Furnish, Install, And Connect The Electrical Connections For The Modulars Per Building And Safety Requirements Including The Distribution Boards Upgrade Per SCE Requirements and the Plans LS 1
385,000.00$ 385,000.00$ 50,000.00$ 50,000.00$ 685,420.00$ 685,420.00$ 613,918.00$ 613,918.00$ 455,000.00$ 455,000.00$ 918,000.00$ 918,000.00$ 841,500.00$ 841,500.00$ $564,119.71 $564,119.71 $50,000.00 $918,000.00 27 3" Thick Asphalt Grindings With 1” Rock Rolled Over 90% Compacted Subgrade. Ton 650 80.00$ 52,000.00$ 591.02$ 384,163.00$ 165.00$ 107,250.00$ 157.00$ 102,050.00$ 75.50$ 49,075.00$ 163.00$ 105,950.00$ 39.27$ 25,525.50$ $181.54 $118,001.93 $39.27 $591.02 28 Furnish And Install A Chain Link Fence At The East Side Of The New Parking Lot
LS 1 18,000.00$ 18,000.00$ 35,000.00$ 35,000.00$ 23,700.00$ 23,700.00$ 30,667.00$ 30,667.00$ 5,400.00$ 5,400.00$ 50,796.00$ 50,796.00$ 46,563.00$ 46,563.00$ $30,018.00 $30,018.00 $5,400.00 $50,796.00 29 Furnish, Install, Connect And Complete In Place Parking Solar Lights including the foundation As Per The Plans.

EA 7 5,000.00$ 35,000.00$ 6,285.39$ 43,997.73$ 15,700.00$ 109,900.00$ 12,975.00$ 90,825.00$ 12,500.00$ 87,500.00$ 17,049.00$ 119,343.00$ 9,737.36$ 68,161.52$ $11,320.96 $79,246.75 $5,000.00 $17,049.00 30 Design and construct trash enclosure per the architect Drawing EA 1 30,000.00$ 30,000.00$ 81,000.00$ 81,000.00$ 85,700.00$ 85,700.00$ 74,553.00$ 74,553.00$ 118,000.00$ 118,000.00$ 35,000.00$ 35,000.00$ 140,250.00$ 140,250.00$ $80,643.29 $80,643.29 $30,000.00 $140,250.00 31 Furnish and install ACO H300SK-13 Slab drain with longitudinal iron grate (or approved equal) as specified in the grading plan.

LF 300 50.00$ 15,000.00$ 135.00$ 40,500.00$ 385.00$ 115,500.00$ 391.00$ 117,300.00$ 325.00$ 97,500.00$ 60.00$ 18,000.00$ 604.98$ 181,494.00$ $278.71 $83,613.43 $50.00 $604.98 32 Furnish and install 4” schedule 80 p.v.c drainpipe as specified in the grading plan.

LF 315 60.00$ 18,900.00$ 25.00$ 7,875.00$ 291.00$ 91,665.00$ 128.00$ 40,320.00$ 90.47$ 28,498.05$ 38.00$ 11,970.00$ 210.61$ 66,342.15$ $120.44 $37,938.60 $25.00 $291.00 33 Construct infiltration trench per WQMP as specified in the grading plan
CY 170 80.00$ 13,600.00$ 160.00$ 27,200.00$ 310.00$ 52,700.00$ 110.00$ 18,700.00$ 197.50$ 33,575.00$ 100.00$ 17,000.00$ 244.79$ 41,614.30$ $171.76 $29,198.47 $80.00 $310.00 Leonida Builders Inc. Estate Design and
Construction Horizons Construction RG General Engineering Inc.

Dorado Design
Construction JRH Construction RC Construction
$1,046,870.00 $1,511,000.03 $1,951,544.00 $2,077,369.00 $2,272,973.05 $2,589,324.00 $2,697,425.65 $1,046,870.00 $1,511,000.00 $1,951,544.00 $2,077,369.00 $2,272,973.05 $2,589,374.00 $2,697,433.00 $0.00 $0.03 $0.00 $0.00 $0.00 -$50.00 -$7.35
A.
1 Utility Standby Time Month 1
$26,000.00 $26,000.00 $20,000.00 $20,000.00 $7,420.00 $7,420.00 $5,000.00 $5,000.00 $58,565.00 $58,565.00 $26,000.00 $26,000.00 $40,250.00 $40,250.00 A.
2 Construct a new Reinforced concrete pad per detail on the final electrical plan with additional underground conduits SF 100 $25.00 $2,500.00 $35.00 $3,500.00 $180.00 $18,000.00 $214.00 $21,400.00 $785.00 $78,500.00 $200.00 $20,000.00 $287.50 $28,750.00 $28,500.00 $23,500.00 $25,420.00 $26,400.00 $137,065.00 $46,000.00 $69,000.00 $1,075,370.00 $1,534,500.03 $1,976,964.00 $2,103,769.00 $2,410,038.05 $2,635,324.00 $2,766,425.65

1. BID TABULATION
PROJECT NAME: San Bernardino Animal Shilter Improvements PROJECT NO: [RFP F-24-1004]

BID TABULATION
Leonida Builders Inc. Estate Design and Construction

HIGHEST UNIT BID
PRICEActon , CA Culver, CA Orange, CA Norco, CA Pasadena, CA Irvine, CA Redlands, CA RG General Engineering Inc. Dorado Design Construction JRH Construction RC Construction

AVERAGE BID VALUES LOWEST UNIT BID
PRICE
Horizons Construction
ADDITIVE ALTERNATE # TOTAL
BASE BID + ADDITIVE ALTERNATVE TOTAL
Bid Item and Description

BID RANKING

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

TOTAL BID AMOUNT INDICATED BY BIDDER

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT ADDITIVE ALTERNATE #1