Date: July 20, 2023
Attn: Waterman Business Center Association
328 E Commercial Rd #107
San Bernardino, California 92408
From: Michael Rosales, Associate Planner
City of San Bernardino, Planning Division
Subject: Amendment to Conditions of Approval 23-01 for Administrative Development Permit 22-20
Waterman Business Center Association:
After researching the original entitlement for the property located at 379 E. Industrial Road (APN:0141-581-03), the City of San Bernardino has become aware that the conditions of approval within Administrative Development Permit 22-20 placed on 379 E. Industrial Road (APN:0141- 581-03) are more restrictive than conditions on other businesses within the business complex.
The City has determined that such conditions are not required under the business complex's original entitlement conditions or the City's development code restrictions and therefore, the City is removing Conditions of Approval numbers 20-26 within Administrative Development Permit 22-
20. The conditions being removed are better suited for private negotiation between the Association and the business owner. If you have any questions, please reach out to the City of San Bernardino Planning Division. Thank you.
Sincerely
Michael Rosales
Associate Planner
Attachments: AC 23-01 for ADP 22-20
Exhibit "A" ADP 22-20 (original executed copy)
LARDING City of
San Bernardino
Community and Economic Development Department | Planning Division
EINDED IN IND
July 20, 2023
SGE Consulting Engineers
2081 Business Center Drive #105
Irvine, CA 92612
SUBJECT: AMENDMENT CONDITIONS 23-01 FOR
ADMINISTRATIVE DEVELOPMENT PERMIT 22-20 TO
AMEND THE CONDITIONS OF APPROVAL SET BY THE
CITY OF SAN BERNARDINO PLANNING DIVISION FOR
THE PREVIOUSLY APPROVED PROJECT LOCATED AT
379 E. INDUSTRIAL ROAD (APN: 0141-581-03), WITHIN
THE INDUSTRIAL LIGHT (IL) ZONE.
Dear SGE Consulting Engineers:
The Planning Division has completed its review of application Amendment to Conditions 23-01 for the previously approved project known as Administrative Development Permit 22-20 which was a request to allow the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building located on a parcel containing approximately 0.83 acres located at 379 E. Industrial Road (APN:0141-581-03).
Environmental Determination
Being the decision-making body for the project, the Planning Division has reviewed and considered the information contained in the administrative record for Amendment to Conditions 23-01. Based upon the facts and information contained in the administrative record, including all written and oral evidence presented to the Planning Division finds as follows:
1. The administrative record has been completed in compliance with CEQA, the State CEQA Guidelines, and the City's Local CEQA Guidelines;
2. The proposed project is categorically exempt from the requirements of the California Environmental Quality Act pursuant to 15061(b)(3) (Review of Exemption) of the CEQA Guidelines;
3. The application of the categorical exemption is not barred by one of the exceptions set forth in the CEQA Guidelines Section 15061(b)(3); and
4. The determination of CEQA exemption reflects the independent judgment of the Planning Division.
CONDITIONS OF APPROVAL
The approval of Amendment to Conditions 23-01 for Administrative Development Permit 22-20 shall be subject to the following Conditions of Approval:
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | F: 909-384-5155| www.SBCity.org City of San Bernardino
1. This approval authorizes the applicant an allowance for the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial builia (cated ra parel containine intoxia lig 083, 20s located at 379
2. This approval shall comply with Administrative Development Permit 22-20, dated June 22, 2022 (EXHIBIT "A").
Planning Division
The following Conditions of Approval for previous approved Administrative Development Permit 22-20 are redacted from the original approval Administrative Development Permit 22-20 as follows:
20.Bobtail and semi trucks will park, load, and unload only in the areas designated on Exhibit Applicant will limit semi-trucks access/egress to and from the lot to between the hours of 2:00 pm and 6:00 am. No semi trucks will park on site outside of these hours. 21 .Applicant agrees to sereen the Liquid Nitrogen Tank in accordance with the plans approved by WBCA and the metal sereening material will be painted to match the main building field color of 379 E Industrial Building.
22 Applicant agrees to install and maintain landscaping (including proper irrigation) to screen views from adjacent property in accordance with the plans to be approved by WBCA.
23.Applicant agrees to properly and promptly dispose of all waste to minimize odors and pests
24.No utility lines will be mounted on the exterior of the building.
25. The storm drain trench (which is WBCA property) is to remain undisturbed before, during and after construction. The storm drain flow of the lot will be maintained and not altered.
26.In-addition to these conditions, WBCA is requiring proper notice (minimum 3 business days) and insurance before starting construction over, near, under, around the fire water main that runs through the proposed construction area.
Please be advised that the decision is final unless a written appeal is filed, with the appropriate fee, within fifteen (15) days of the date following the final date of approval, pursuant to Section
19.52.100 of the City of San Bernardino Development Code.
Should you have any questions regarding the approval of Amendment to Conditions 23-01 for Administrative Development Permit 22-020, please contact me directly at (909) 384-5930 or via email at rosales [email protected].
Respectfully,
Michael Rosales
Associate Planner
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org | @SBCityGov EXHIBIT «A"
Previously Approved Administrative Development Permit 22-20 ARDINO, CT San Bernardino City of
Community and Economic Development Department | Planning Division SUNDEDIE 199
June 22, 2022
SGE Consulting Engineers
2081 Business Center Drive #105
Irvine, CA 92612
SUBJECT: ADMINISTRATIVE DEVELOPMENT PERMIT 22-20 - A
REQUEST TO ALLOW THE INSTALLATION OF AN
ABOVE GROUND LIQUID NITROGEN TANK AND
EQUIPMENT ENCLOSURE ANCILLARY TO AN
EXISTING INDUSTRIAL BUILDING, ON A PARCEL
CONTAINING APPROXIMATLEY 0.83 ACRES, LOCATED
AT 379 E. INDUSTRIAL ROAD (APN: 0141-581-03), WITHIN
THE INDUSTRIAL LIGHT (IL) ZONE, AND FINDING THE
PROJECT SUBJECT TO CATOGORICAL EXEMPTION
UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY
ACT.
Dear SGE Consulting Engineers:
The Planning Division has completed its review of your application for a request to allow the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building located on a parcel containing approximately 0.83 acres. The project site is located at 379 E. Industrial Road (APN:0141-581-03). Staff has determined that the proposed project is in compliance with all applicable regulations set forth by Chapter 19.44 (Development Permits) of the City of San Bernardino for the proposed land use.
Environmental Determination
Being the decision-making body for the project, the Planning Division has reviewed and considered the information contained in the administrative record for Administrative Development Permit 22-20. Based upon the facts and information contained in the administrative record, including all written and oral evidence presented to the Planning Division finds as follows:
1. The administrative record has been completed in compliance with CEQA, the State CEQA Guidelines, and the City's Local CEQA Guidelines, and
2. The proposed project is categorically exempt from the requirements of the California Environmental Quality Act pursuant to §15301 (Existing Facilities) of the CEQA Guidelines; and
The application of the categorical exemption is not barred by one of the exceptions set forth in the CEQA Guidelines Section 15300.2; and
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | F: 909-384-5155| www.SBCity.org City of San Bernardino Administrative Development Permit 22-020
4. The determination of CEQA exemption reflects the independent judgment of the Planning Division.
Findings
Section 19.44.040 (Findings) of the City of San Bernardino Development Code requires that Administrative Development Permit applications meet certain findings prior to the approval by the Planning Division. Accordingly, the following findings are provided in support of the approval of Administrative Development Permit 22-20:
1. The proposed development is one permitted within the subject zoning district and complies with all of the applicable provisions of the Development Code, including prescribed development/site standards and any/all applicable design guidelines.
The proposed project involves the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building. The existing use is a permitted use within the Industrial Light (IL) zone, and the proposed project complies will all the applicable provisions of the City of San Bernardino Development Code, including development standards and applicable design guidelines.
2. The proposed development is consistent with the General Plan.
Policy 2.1.1 of the City of San Bernardino General Plan Land Use Element states: "Ensure compatibility between land uses and quality design through adherence to the standards and regulations in the Development Code and policies and guidelines in the Community Design Element." The proposed project involves the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building. The proposed project will maintain the integrity of the existing use and will adhere to the standards and regulations of the Development Code without generating impacts on the surrounding land uses. Thus, the proposed project would be compatible with surrounding land uses and maintain the existing site design.
3. The proposed development would be harmonious and compatible with existing and future developments within the zone and general area, as well as with the land uses presently on the subject property.
The location, size, and design characteristic of the proposed installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building on an existing developed commercial site is consistent and compatible within the Industrial Light (IL) zone and the surrounding general area.
4. The approval of the Administrative Development Permit for the proposed development is in compliance with the requirements of the California Environmental Quality Act and Section
19.20.030(6) of the Development Code.
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org|@SBCityGov City of San Bernardino Administrative Development Permit 22-020 The installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building Administrative Development Permit 22- 020 is Categorically Exempt from CEQA pursuant to Section 15301 of the CEQA Guidelines because the proposed project meets the required criteria to qualify as "Existing Facility" as defined by Section 15301 of the CEQA Guidelines.
5. There will be no potential significant negative impacts upon the environmental quality and natural resources that could not be properly mitigated.
Administrative Development Permit 22-020 has been evaluated pursuant to the CEQA Guidelines and based upon the fact that the proposal involves the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building, it has been determined that it will not create any negative impacts upon environmental quality or natural resources within the project site or its vicinity.
6. The subject site is physically suitable to the type and density/intensity of the use being proposed.
The installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building will not intensify the density or intensity of the existing use and will be constructed pursuant to the land use regulation and development standards of the Industrial Light (IL) Zone.
serie are ansquate proni pirop toe public ice so, beder, sanitation pana medit vand sa end.
The existing industrial site has been developed with the required public improvements and utilities and the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building would not be detrimental to public health and safety.
8. The location, size, design, and operating characteristics of the proposed development would not be detrimental to the public interest, health, safety, convenience, or welfare of the City.
The proposal involves the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building, on an existing industrial site that will not create excess noise, nor will it generate significant additional traffic to and from the site. Therefore, the project will not create conditions or situations that may be detrimental to the public interest, health, safety, convenience, or welfare of the City. 290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org | @SBCityGov City of San Bernardino Administrative Development Permit 22-020 Planning Division Action
Based upon the comprehensive review and evaluation, as required by Chapter 19.44 of the City of San Bernardino Development Code, Administrative Development Permit 22-020 has been approved, subject to the following Conditions of Approval:
1. This Administrative Development Permit is an approval to allow the installation of a nine thousand (9,000) gallon liquid nitrogen tank and equipment enclosure ancillary to the existing industrial building. The project site is located at 379 E. Industrial Road (APN:0141-581-03), within the Industrial Light (IL) Zone.
2. Within two (2) years of the Administrative Development Permit approval, commencement of construction shall have occurred, or the permit/approval shall become null and void. In addition, if after commencement of construction, work is discontinued for a period of one (1) year, then the permit/approval shall become null and void. However, approval of the Administrative Development Permit does not authorize commencement of construction.
All necessary permits must be obtained prior to commencement of specified construction activities included in the Conditions of Approval.
3. The site shall be developed and maintained in accordance with the approved plans stamped June 22, 2022 approved by the City, which includes a site plan, on file in the Planning Division; the conditions contained herein; and, the City's Municipal Code regulations.
EXPIRATION DATE: June 22, 2024
4. The review authority may grant a time extension, for good cause, not to exceed twelve (12) months. The applicant must file an application, the processing tees, and all required submittal items thirty (30) days prior to the expiration date. The review authority shall ensure that the project complies with all Development Code provisions in effect at the time of the requested extension.
5. In the event this approval is legally challenged, the City will promptly notify the applicant of any claim, action or proceeding and will cooperate fully in the defense of this matter.
Once notified, the applicant agrees to defend, indemnify and hold harmless the City of San Bernardino (City), any departments, agencies, divisions, boards or commission of the City as well as predecessors, successors, assigns, agents, directors, elected officials, officers, employees, representatives and attorneys of the City from any claim, action or proceeding against any of the foregoing persons or entitles.
6. The applicant further agrees to reimburse the City for any costs and attorneys' fees which the City may be required by a court to pay as a result of such action, but such participation shall not relieve applicant of his or her obligation under this condition. The costs, salaries, and expenses of the City Attorney and employees of his office shall be considered as "Attorney's fees" for the purpose of this condition. As part of the consideration for issuing this Administrative Development Permit, this condition shall remain in effect if the Administrative Development Permit is rescinded or revoked, whether or not at the request of applicant.
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org | @SBCityGov City of San Bernardino Administrative Development Permit 22-020
7. The project shall comply with all applicable requirements of the Building and Safety Division, Fire Department, Police Department, Municipal Water Department, Public Services Department, and the City Clerk's Office/Business Registration Division.
8. If the color or architecture of the building is proposed to be moditied in the future, the revised color scheme and or architecture shall be submitted to the Planning Division prior to any modification of the building exterior, for evaluation for substantial conformance to the approved plans.
9. Minor Modification to the plans shall be subject to approval by the Director through the Minor Modification Permit process. Any modification which exceeds ten percent (10%) of allowable measurable design/site considerations shall require the refilling of the original application.
10. The property owners), facility operator and property management will be responsible for regular maintenance of the site. The site shall be maintained in a clean condition and free of litter and any other undesirable material(s). Vandalism, graffiti, trash and other debris must be removed within 24 hours of being reported.
11. The applicant/owner shall maintain all existing landscaping in the parking lot and setbacks in a weed and disease free condition at all times and any dead or missing vegetation must be promptly replaced.
12. Signs are not approved as part of this permit. Prior to establishing any new signs or replacing existing signs, the applicant shall submit an application and receive approval for a Sign Permit from the Planning Division. Signs painted on the buildings are prohibited.
Banners, flags, pennant, and similar signs are prohibited unless a Temporary Sign Permit is obtained.
13. Submittal requirements for permit applications (site improvements, landscaping, etc.) to Building Plan Check and/or Land Development must include all Conditions of Approval printed on the plan sheets.
14. A concrete washout shall be provided for the proposed project.
15. All Conditions of Approval shall be completed prior to final inspection and sign-off.
16. All new construction shall require permits prior to commencement.
17. Construction-related activities may not occur between the hours of 8:00 pm and 7:00 am.
No construction vehicles, equipment, or employees may be delivered to, or arrive at the construction site before 7:00 am or leave the site after 8:00 pm. Construction activities may only occur Monday through Friday.
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org | @SBCityGov City of San Bernardino Administrative Development Permit 22-020
18. All new construction shall be confirmed with the San Bernardino County Fire Department.
Please contact San Bernardino County Fire Department Fire Prevention, located at 200 E. 3rd Street, San Bernardino, CA 92410 regarding all and/or any submittal requirements regarding new construction via phone at (909) 918-2200. The project shall comply with all applicable requirements of the Building and Safety Division, Fire Department, Police Department, Municipal Water Department, Public Services Department, and the City Clerk's Office/Business Registration Division.
19. Applicant shall ensure that all its vehicles and those of its employees and visitors park only on the 379 E Industrial Road lot and do not park on any other owner's property without a written agreement in place with that owner.
20. Bobtail and semi-trucks will park, load, and unload only in the areas designated on Exhibit A. Applicant will limit semi-trucks access/egress to and from the lot to between the hours of 9:00 pm and 6:00 am. No semi-trucks will park on site outside of these hours.
21. Applicant agrees to screen the Liquid Nitrogen Tank in accordance with the plans approved by WBCA and the metal screening material will be painted to match the main building field color of 379 E Industrial Building.
22. Applicant agrees to install and maintain landscaping (including proper irrigation) to screen views from adjacent property in accordance with the plans to be approved by WBCA.
23. Applicant agrees to properly and promptly dispose of all waste to minimize odors and pests
24. No utility lines will be mounted on the exterior of the building.
25. The storm drain trench (which is WBCA property) is to remain undisturbed before, during and after construction. The storm drain flow of the lot will be maintained and not altered.
26. In addition to these conditions, WBCA is requiring proper notice (minimum 3 business days) and insurance before starting construction over, near, under, around the fire water main that runs through the proposed construction area.
Public Works Conditions
a. For the streets listed below, dedication of adequate street right-of-way (R.W.) per the General Plan and Municipal Code shall provide the distance from street centerline to property line and placement of the curb line (C.L.) in relation to the street centerline shall be as follows:
Dedication of Right of Way Curb Line(ft)
Street Name (ft.) from centerline
Industrial Parkway 30' Existing 19't/- Existing
(0141-581-03-0000) No Dedication None-Proposed
"Local Industrial"
Per General Plan
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org| @SBCityGov City of San Bernardino Administrative Development Permit 22-020 b. Industrial Road-TI=5.5:
Placement of the tank shall not be within the existing or any future rights- of-way.
ії) The existing curb & gutter, sidewalk, and/or driveway fronting the site are in fair condition, if any curb & gutter panels, or sidewalk panels are lifted, cracked, or do not meet current ADA requirements, each of the panels shall be replaced per city standards. Install Sidewalk in missing areas of the iii) Construct Commercial Driveway Approach per City Standard No. 204, Type II, including an accessible by-pass around the top of the drive approach. Minimum Width is 26'. No Driveways closer than 100' from BCR/ECR as directed by the City Engineer.
iv) When replacing/reconstructing curb and gutter panels, construct 8" Curb and Gutter per City Standard No. 200, type "B".
If Replacing or reconstructing Sidewalk panels construct Sidewalk per City Standard No. 202; Case "A" (6' wide adjacent to curb).
vi) Survey Monuments and ties shall be placed, replaced, tied out and recorded at any corner or alignment changes that are adjacent to the project area in accordance with 'California Land Surveyors Association - Monument Preservation Guidelines, Copies of Recorded Monuments/Ties shall be delivered to Public Works/Engineering.
* A Scoping Form is required, this form shall indicate the need of a Traffic Report, the results of the traffic report shall become conditions of this project which may increase or extend the above requirements in section 1(b) and 5(a). * These Conditions are set for an estimated construction with-in two years. If construction exceeds two years from DERC Approval these conditions shall be reviewed and updated as needed. A second copy of the drainage report will be delivered to public works, if offsite or overflow storm drain systems are identified, all systems shall be identified on the street improvement plans, public storm drain shall be on a separate set of plans.
c. City approved trash screens and filtration devices shall be installed in all catch basins or manhole connections.
d. A temporary construction encroachment permit from Public Works Department shall be required for utility cuts into existing streets or any work within City's right- of-way. Pavement restoration or trench repair shall be in conformance with City Standard No. 310. Public facilities shall be restored or constructed back to Public Works Department satisfaction.
e. Any pavement works affecting the traffic loop detectors shall be coordinated and subjected to Public Works Traffic Division requirements. 290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org| @SBCityGov City of San Bernardino Administrative Development Permit 22-020 f. The applicant must post a performance bond prior to issuance of the off-site permit.
The amount of the bond is to be determined by Public Works Department. g. The above conditions shall comply with current codes and policies at time of construction.
h. The above conditions shall comply with current codes, policies, and standards at time of construction.
i. Prior to a Certificate of Occupancy or Completion of Project all As-builts shall be submitted to Public Works.
27. Required Engineering Plans
a. A complete submittal for plan checking shall consist of:
• Street improvement plans (may include streetlight or street lighting may be separate plans).
• Signing and striping plan (may be on sheets included in street improvement plan
• On-site improvement plans and landscaping and irrigation, • Lighting (on-site lighting may be included in on-site improvement plan or may be on a separate stand-alone plan).
• CFD's are required, the CFD Plans shall include Landscaping, Irrigation, Basins, etc. items that are included in the CFD that are not listed in the plans above, shall be on separate sheets included in the street improvement plans. • Other plans as required. Piecemeal submittal of various types of plans for the same project will not be allowed.
• All required supporting calculations, studies and reports must be included in the initial submittal (including but not limited to drainage studies, soils reports, structural calculations).
b. Copies of the City's design policies and procedures and standard drawings are available at the Public Works Counter for the cost of reproduction. They are also available at no charge at the Public Works Web Site at http://www.sbcity.org. c. All off-site improvement plans submitted for plan check shall be prepared on the City's standard 24" x 36" sheets. A signature block satisfactory to the City Engineer or his designee shall be provided.
d. After completion of plan checking, final Mylar drawings, stamped and signed by the Registered Civil Engineer in charge, shall be submitted to the City Engineer and/or Building Official for approval.
e. Electronic files of all improvement plans/drawings shall be submitted to the City Engineer. The files shall be compatible with AutoCAD 2021 and include a dxf file of the proiect. Files shall be on CD and shall be submitted at the same time the final mylar drawings are submitted for approval.
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org | @SBCityGov City of San Bernardino Administrative Development Permit 22-020
28. Required Engineering Permits
a. On-site improvements construction permit (except buildings - see Development Services-Building Division), including landscaping.
b. Off-site improvement construction permits.
c. WQMP/Hydrology (THR) (if applicable)
d. CFD/Street Dedication Permit (if applicable)
e. Traffic Control and ROW Permits (if applicable)
29. Applicable Engineering Fees
a. The current fee schedule is available at the Public Works Counter and at http://www.sbcity.org
b. All plan check: permit, inspection, and impact fees are outlined on the Public Works Fee Schedule. Á deposit in the amount of 100% of the estimated checking fee for each set of plans will be required at time of application for plan check. c. The amount of the fee is subject to adjustment if the construction cost estimate varies more than 10% from the estimate submitted with the application for plan checking.
30. Traffic Requirements
a. All Traffic mitigation measures shall be implemented according to the recommendations of the City Traffic Engineer prior to Street Improvement plan.
31. Integrated Waste Management
a. During demolition and/or construction, services are to be provided through the City of San Bernardino's franchised hauler Burrtec Waste Industries, Inc. b. The site plan dated November 22, 2021, identifies the installation of a 9,000-gallon liquid nitrogen tank and equipment enclosure at an existing building located at 379. c. Burrtec Waste's review of the site plan identifies a proposed nitrogen storage tank located east of the existing refuse enclosure serving the property. The enclosure is currently accessed by a looped driveway. Based on the information provided, the roject tank and enclosure will not impact Burrtec s ability to service the existin efuse enclosure. Any changes to the overall design, enclosure specifications o location, or access may adversely impact Burrtec' s ability to service the project.
Any design modification that could impact Burrtec' s service will be subject to s review of this project is limited to determining
review by mute utter se in inum stat daris for wet te and red to ecommitin services. Any comments or approvals by Burtec are limited to these minimum standards as they relate to equipment and personnel and do not pertain to the project's compliance with applicable federal, state and local land use and environmental laws, building codes or other applicable government regulations. 290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org| @SBCityGov City of San Bernardino Administrative Development Permit 22-020 Any approvals by Burtec do not warrant or represent that Burrtec accepts any liability relative to the performance of waste and recycling collection services within this project.
d. Contact the Building & Safety Division to determine ADA accessibility requirements. Modifications made to refuse enclosures to meet ADA accessibility requirements shall not decrease the minimum clear interior dimensions needed for the container storage area.
e. Refuse enclosures within five (5) feet of combustible construction shall install an automatic fire sprinkler as approved by the Building & Safety Division and the San Bernardino County Fire Department. (See City Standard Plan 508). f. Refuse enclosure roofs shall be a minimum of eight (8) feet high interior at its lowest point, with minimal front protrusions that can be damaged during container servicing and must extend over any open side or the rear of the refuse enclosure by at least six (6) inches or as approved by the City.
g. Burrtec Waste Truck Turning Radius - All corners and intersections on streets and driveways leading to refuse enclosures shall have a turning radius adequate for a 35-foot long, three-axle collection truck. The minimum inside curb radius shall be at least 28 feet. The minimum outside curb radius shall be at least 42 feet. All streets and driveways shall comply with applicable City standards. Burrtec Waste's truck turning template may be obtained from the Public Works Department in PDF and CAD.
h. Vertical and Horizontal Clearances - The minimum vertical clearance for collection trucks along the entire route to the refuse enclosure is fifteen (15) feet.
The minimum vertical clearance in front of the refuse enclosure where the truck will empty the container shall be twenty-six (26) feet. The clear height shall be free of building overhangs, trees, and utility lines. The minimum horizontal clearance along the entire route to an enclosure is 12 feet.
Hammerhead Turnarounds - Shall meet or exceed San Bernardino County Fire rotection District Diagram A-1.12: Hammerhead Turnaround Detail dated July 1 021. San Bernardino County Hammerhead detail may be obtained from the Publi Works Department.
j. If gated, access shall be provided by means of a key, code, or remote. k. Assembly Bill 341 Mandatory Commercial Recycling may apply.
1. Assembly Bill 1826 Mandatory Commercial Organics Recycling may apply. m. Senate Bill 1383 Short-Lived Climate Pollutants Reduction Act may apply. n. Upon completion, service is provided through the City of San Bernardino's franchised hauler Burrtec Waste Industries, Inc. 111 E. Mill Street, San Bernardino, CA 92408 (909) 804-4222.
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org|@SBCityGov City of San Bernardino Administrative Development Permit 22-020 San Bernardino Consolidated Fire District
31. All conditions set forth by the County of San Bernardino Fire Department shall be followed.
Please be advised that the decision of the Community Development Director is final unless a written appeal is filed, with the appropriate fee, within fifteen (15) days of the date following the final date of approval, pursuant to Section 19.52.100 of the City of San Bernardino Development Code. Should you have any questions regarding the approval of Administrative Development Permit 22-020, please contact me directly at (909) 384-5930 or via email at [email protected].
Respectfully,
Michael Rosales
Associate Planner
Он,
Oliver Mujica
Planning Division Ma ager
Attachments: Approved Site Plans
290 North D St, San Bernardino, CA 92401 | P: 909-384-7272 | www.SBCity.org | @SBCityGov
CONSTRUCTION NOTES
CUENT
PROJECT INFORMATION
PRACTICAL
SOLUTIONS
man-
PROJECT TEAM
NSTALLATION OF 9,000-GAL LIN TANK AND ENCLOSURE Adesa Internatio nai 379 E Industial Ra, San Bemedina, CA53409 1990000
PARKING ANALYSIS
PARKING SUMMARY
1 STEPANA
KEYNOTES
City of San Bernardino
Communtty & Econorific Development Department GATE ONe 2, 8
DEAR, BY OMELA NO
Sing Dysion 4/22/12 APPROVED BY
Approved SITE PLAN,
Date: VICINITY MAP NOTES &
By: fAs PROJECT
INFORMATION
SP1
CLIENT
PRACTICAL
SOLUTIONS
1223 VANADA RD.
LA BORADA, CA 0630
SEPA INSTALLATION OF 9,000-GAL LIN TANK AND ENCLOSURE LOCATIOK Adasa International
AMARED AREA OF WORK I
ADA PARKING STANDARDS
B0520814,124747
KEYNOTES REVISIONS
DESIGNED BY
Cily/of San Remardino elopment Department APPROVED BY
ENLARGED
Commun eproved (pion 6/24/22 AREA OF WORK
ELEVATIONS &
Date: DETAILS
SP2
CONSTRUCTION NOTES
La Merede
INSTALLATION OF 9,000-GAL LIN TANK AND ENCLOSURE Adasa Intamational 179 E Indetial Rd dan Bernardino, CA 22400 (N) PAD, (N) ENCLOSURE AND (N) TANK LAYOUT
HA
GE
+
DO PEROR ANCHORT HEL
REVISIONS
SLIDE FLATE
SANTO T
.::= STRUCTURAL
di San Bema. LAYOUT.
City velopment De GONID DEBION PARAMETER SCHEDULE NOTES &
ANCHORAGE SCHEDULE SPECIAL INSPECTION SCHEDULE DETAILS
Commun → Division 4/22/22
proved S1
GLENT
PRACTICAL
SOLUTIONS
1/
15 Ф
INSTALLATION OF 9,000-GAL LIN TANK
MAYATEN ones 1 N) 9,000-GALLON IN TANK TENSION ANCHORAGE MA CALLON LIN TANK ANCHORAGE: TYP, BECTOR, NTS
3 NOT LON LIN TANK SHEAR ANCHORAGE \ (N) SKIRT (WHERE NECESSARY; City of San Bemardino Development Department
Community & Evny man sm m
Division (/2/a
roved REVISIONS
Date: _
Byt-
MOPERA
STRUCTURAL
DETAILS
S2
TERIAL SCHEDULE
INSTALLATION OF 9,000-GAL LIN TANK 179 EAteneRA, San Bernardha, CA 82400 (ROTATED 90)
7) BORNE ANCHORAGE IN) BASEPLATE E M BASEPLATE F
PLAN, NTB
005/08m. 2U74
REVISIONS
ENCLOSURE
DETAILS
10) MOONECTON IT CAN HORAGE of San Bernardino (12) o CONNEcTON COLUMN CAP S3
COME NTS
City
Community Division 6/22/22
Groved
ate:
iz2'HZ
-- ---—
-
ENLARGED
AREA OF WORK SP2
_--
4 PARKING SPACES TO BE REMOVED
taNt
Bobtail
.12 9E
49.46%_
88.49 CITY OF SAN BERNARDINO
COMMUNITY DEVELOPMENT DEPARTMENT
NOTICE OF EXEMPTION
FROM: CITY OF SAN BERNARDINO TO: • OFFICE OF PLANNING & RESEARCH Community Development Department 1400 Tenth Street, Room 121 201 N. E Street Sacramento, CA 95814
San Bernardino, CA 92401
CLERK OF THE BOARD
Subject: Filing of a Notice of Exemption pursuant to CEQA Guidelines Project Title: Administrative Development Permit 22-020 Lead Agency Contact Person: Michael Rosales
Telephone (include area code): (909) 384-5930
Project Location (include county): 950 S. E Street, City of San Bernardino, County of San Project Description: request to allow the installation of a nine thousand (9,000) (APN:0141-581-03), within the Industrial Light (LL) zone zone, Ward 3.
Name of Public Agency Approving Project: City of San Bernardino, Community and Economic Development Department
Name of Applicant or Agency Implementing Project: SGE Consulting Engineers X Categorical Exemption. State Type & Section Number: §15301 (Existing Facilities) ] Emergency Project (§21080(b)(3); §15269(a))
• Declared Emergency (§21080(b)(4); §15269(b)(c))
Reasons why project is exempt from: The project is exempt from CEOA review under a Class 1 exemption for Existing Facilities due to the fact that the project does not constitute more than 50% of building addition to the existing structure.
This is to certify that the record of project approval is available to the public at the Community Development Department, Planning Division, 201 North E Street, 3 Floor, San Bernardino, CA 92401 during regular business hours.
Signature: Date: June 22, 2022 Title: Assistant Planner Michael Rosales X Signed by Lead Agency Signed by Applicant
Date received for filing at OPR: