1. BID TABULATION
PROJECT NAME: UNIVERSITY PARKWAY EXTENSION - MEDIAN & STREETSCAPE IMPROVEMENTS PROJECT NO: SS04-009B
Apparent Low Bldder 1 Apparent Low Bidder 2 Apparent Low Bidder 3 Apparent Low Bidder 4
BID TABULATION
HL Hitchcock Construction Inc. 1st California Construction, Inc Leonida Builders, Inc. Gentry General Engineering Inc.
Bld Item and Description Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Tolal Price
Bid Schedule Addendum 3
Mobilization, Demobilization, Insurance, Permits, and
Miscellaneous. Fumish and install 4' x 8' project sign. 1.0 LS $48,140.00 $48,140.00 $182,556.50 $182,556.50 $50,000.00 $50,000.00 $28,300.00 $28.300.00 2 Traffic Control and Safety 1.0 LS $27.000.00 $27,000.00 $44,250.00 $44,250.00 20,000.00 $20.000.00 $95.300.00 $95.300.00 3 Storm Water Poltution Prevention Plan and BMPs 1.0 LS $15.000.00 $15,000.00 $14,100.00 $14,100.00 10.000.00 $19,900.00 $19.900.00 $10,000.00
4 Clearing, Grubbing, Unclassified Excavation and Unclassified Fill 1.0 LS $37,750.00 $37,750.00 $63,092.00 $63,092.00 68,000.00 $68,000.00 $12,100.00 $12,100.00 5 Remove Existing AC Pavement 230.0 CY $150.00 $34,500.00 $333.00 $76,590.00 250.00 $57.500.00 $186.00 $42,780.00 6 Remove Existing PCC 53.0 SF $32.00 $1.696.00 $27.50 $1,457.50 10.00 $6.50 $344.50 7 Construct HMA Pavement $530.00
120.0 TON $215.00 $25,800.00 $70.00 $8,400.00 350.00 $42,000.00 $295.00 $35,400.00 8 Construct Aggregate Base 69.0 TON $135.00 $12.015.00 $840.00 $6,675.00 $73.50 $74,760.00 75.00 $6,541.50
9 Construct Case "A" PCC Sidewalk per City Std Plan 202 1.1 CY $5,250.00 $5.775.00 $1,045.00 $1,149.50 2,500.00 $2,750.00 $830.00 $913.00
10 Construct 8° Type "A" PCC Curt per City Std Plan 200 1390.0 $58.00 $80,620.00 $50.00 $69,500.00 45.00 $62,550.00 $38.50 $53,515.00 11 Construct 6" Mow Curb per Detail on Sheet 21 58.0 LF $60.00 $3,480.00 $22.75 25.00 $1.450.00 $13.50 $783.00 $1,319.50
12 Furnish and Install 2 Water Service and Meter per SBMWD Dig No. 1.0 LS $4,800.00 W1.2 $4,800.00 $6,350.00 $6.350.00 4,000.00 $4,000.00 $3,800.00 $3.800.00 13 3 Decomposed Granite Maintenance Band over 95% Compacted $178.00 Subarade 68.0 CY $12,104.00 $120.00 $8,160.00 $ 200.00 $13,600.00 $277.00 $18,836.00 14 Construct Redwood Header 5100.0 LF $12.00 $61,200.00 $23.75 $121,125.00 6.00 $30,600.00 $6.88 S35,088.00 15 Imigation POC 1.0 LS $13,700.00 $13.700.00 $12.040.00 $12,040.00 2,000.00 $2,000.00 $1,797.00 $1,797.00
16 Irigation Control and Solar Power System 1.0 LS $23,900.00 $23,900.00 $8,598.00 $8,598.00 36.000.00 536.000.00 $42,600.00 1 Trenching, Sleeving, For Mainline and Communication Wiring Under $42.600.00 Existing Improvements 1.0 LS $145,650.00 $145,650.00 $9,150.00 $9,150.00 6,000.00 $6,000.00 $5.900.00 $5,900.00 18 Irgation Distribution and Applicalion Improvements 113000.0 SF $1.55 $175,150.00 $0.20 $22,600.00 3.00 $339,000.00 $3.00 $339,000.00 19 Weed and Pest Control Measures 1.0 LS $900.00 $900.00 $5.150.00 $5,150.00 35,000.00 $35.000.00 $40,600.00 $40,600.01
20 Soil Amendment and Finish Grading 113000.0 $0.31 $35,030.00 $0.50 $56,500.00 0.50 $56.500.00 $0.54 $61.020.0 21 Landscape Trees - 24' Box 110.0 EA $540.00 $59,400.00 SB55.00 $94,050.00 900.00 $99,000.00 $1,072.00 S117.920.00 22 Landscape Shrubs and Ground Cover 1.0 $40,185.00 $40,185.00 $113,106.00 $113,106.00 140.000.00 $140,000.00 $206.000.00 $206,000.00
23 3" Mulch For All Planting Areas 113000.0 SF $0.48 $54,240.00 $0.96 $108,480.00 1.00 $113.000.00 $0.90 S101,700.00 24 (Decorative Crushed Stone * 2400.0 $1.50 $3.600.00 $2.15 $5,160.00 20.00 $48,000.00 $21.50 $51,600.00 25 Plant Establishment Period 1.0 LS $9.500.00 $9.500.00 S24,280.00 $24,280.00 21.000.00 $21,000.00 $23.300.00 Remove exisling streetlights (only those on concrete poles ; Turnish and $23.300.00 26 install solar lights. 15.0 EA $4,300.00 $64,500.00 $175.00 $2,625.00 $ 4,300.00 $64,500.00 $4,800.00 $72,000.00 27 Remove existing 4'x & project sign. 1.0 EA $1,200.00 $1,200.00 $925.00 $925.00 500.00 $500.00 $418.00 $448.00 28 Signing, Striping, and Markings 1.0 LS $15.000.00 $15,000.00 $19.000.00 $19,000.00 18.000.00 $18,000.00 $12,700.00 $12,700.00 BID RANKING Apparent Low Bidder 1 Apparent Low Bldder 2 Apparent Low Bidder 3 Apparent Low Bidder 4
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES 51,011,835.00 51,156,474.00 $1.348,155.00 $1,430,186.00 TOTAL BID AMOUNT INDICATED BY BIDDER $1,010,835.00 $1,154,474.00 $1,318,155.00 $1,426,786.00
CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT $1,000.00 $0.00 $0.00 $3,400.00
S:LENGINEERING \Capital Improvement Projects Active Projects \Strect\SS01-009 - State Street\01-PHASE-210. Capital Project Filing\SO Contract Management|50.06 Bids Received\Bid Analys/s_ for printingBID TABULATION 1of1
1. BID TABULATION
PROJECT NAME: UNIVERSITY PARKWAY EXTENSION - MEDIAN & STREETSCAPE IMPROVEMENTS PROJECT NO: S504-009
Apparent Low Bidder 5 Apparent Low Bidder 6 Apparent Low Bidder 7 Apparent Low Bidder 8 Apparent Low Bidder 9
BID TABULATION
Urban Habitat, Inc. Environmental Construction Inc. Landscape Support Services Marina Landscape Inc. Los Angeles Engineering Inc.
Bid Item and Description Quantity Unit Unit Price Total Price Unit Price Unit Price Unit Price Total Price Unit Price Total Prios Total Price Total Price
Bid Schedule Addendum 3
Mobilization Demobilization, Insurance. Bonds, Permits, and Miscellaneous. Fumish and install 4' x 8' proiect sign. 1.0 LS $91.004.77 $91,004.77 $96,840.00 $96,840.00 $164,567.00 $164,567.00 $185.000.00 $185,000.00 $361.709.00 $361,709.00 2 Traffic Control and Safety 1.0 LS $69,638.52 S69.638.52 $80,664.00 590,564.00 $159.979.00 $159,979.00 $35,000.00 $78.000.00 3 Storm Water Pollution Prevention Plan and BMPs $78,000.00
1.0 LS $29,824.94 529,824.94 $25,000.00 $25,000.00 $29,628.00 $29.628.00 $35,000.00 S17.500.00 $17,500.00 4 Clearing, Grubbing, Unclassified Excavation and Unclassified Fill 1.0 LS $78,746.71 $78,746.71 $56,500.00 $56,500.00 $145,631.00 $145.631.00 $350,000.00 5 Remove Existing AC Pavement $95.000.00 $95,000.00
230.0 CY $179.97 S41,393.10 $319.00 $73,370.00 $180.80 S41,584.00 $103,500.00 $220.00 6 Remave Existing PCC $50,600.00
53.0 SF $14.50 $768.50 $15.00 $795.00 $15.00 $795.00 $1,060.00 $22.00 $1,166.00 Construct HMA Pavement 120.0 TON $321.95 $38,634.00 $55,560.00 $247.50 $29,700.00 $41,400.00 $235.00 $28,200.00
8 Construct Aggregate Base 89.0 TON $216.96 $19.309.44
$7,120.00 $159.50 $14, 195.50 $17,800.00 $235.00 $20,915.00 9 Construct Case A PCC Sidewalk per City Std Plan 202 1.1 CY $1,089.82 $1,198.80 $1,430.00 $392.00 $431.20 $2,200.00 10 Construct 8° Type "A" PCC Curb per City Std Plan 200 $2,750.00 $2,420.00 1390,0 LF $34.00 $47,260.00 $87.50 $121.625.00 $55,600.00 $47.00 $65.330.00 11 Construct 6" Mow Curb per Detail on Sheet 21 58.0 LF $23.00 $31.00 $1.798.00 Furnish and Install 2' Water Service and Meter per SBMWD Dwg No. $1.334.00 $2,030.00 $85.00 $4,930.00 12 LS $21,116.48 $21,116.48
W1.2 $93,230.00 $40,000.00 $110.000.00 $110,000.00
13 3 Decomposed Granite Maintenance Band over 95% Compacted 6B.0 $484.92 Subarade $32,974.56 $12,784.00 $136.000.00 $385.00 $26,180.00 14 Construct Redwood Hoader 5100.0 LF $4.83 $24,633.00 $32,538.00 $28,050.00 $8.00 $40,800.00 15 Irrigation POC LS $9,123.47 $9,123.47 $8,700.00 $10.500.00 $12,000.00 $12,000.00 16 Irrigation Control and Solar Power System 10 LS $182,219.63 $182,219.63 $37,250.00 $21.500.00 Trenching, Sleeving, For Mainline and Communication Wiring Under $35,000.00 $35,000.00 Existing Improvements 1.0 LS $177,269.98 $177,269.98 $113,826.00 $150,000.00 $325,000.00 $325,000.00 18 Inigation Distribution and Application Improvements 113000.0 SF $1.62 $183,060.00 $456,520.00 $2.50 $282,500.00 $282.500.00
19 Woed and Peat Control Measures 1.0 $15,057.53 $15.057.53 $29,239.00 $2,500.00 $4,300.00 $4,300.00 20 Soil Amendment and Finish Grading 113000.0 SF $1.28 $144,640.00 $59,890.00 $56,500.00 $0.85 $96,050.00
21 Landscape Trees - 24" Box 110.0 EA $505.91 $55,650.10 $69,300.00 S60,500.00 $595.00 $65,450.00
22 Landscape Shrubs and Ground Cover 1.0 $60,359.77 $60,359.77 $78,982.00 $115,000.00 $70,000.00 $70.000.00 23 3' Mulch For All Planting Areas 113000.0 SF $0.43 $48,590.00 $64,410.00 $56,500.00 $66,670.00 $0.59
24 Decorative Crushed Stone% 2400.0 SF $2.90 $6,960.00 $6,288.00 $12,000.00 $4.00 S9,600.00
25 Plant Establishment Period 1.0 $8.678.57 58.678.57
Remove exisling sleellights (only those on concrole poles): lumnish and $21.176.00 $15.000.00 $7,500.00 $7,500.00 26 install solar lights. 15.0 $4,409.25 $66,138.75 $69,300.00 $60.000.00 $4,200.00 $63,000.00 27 Remove existing 4' x 8 project sign 1.0 5842.86 $842.86 $167.00 S750.00 $600.00 28 Signing. Striping, and Markinga 1.0 S600.00
LS $20,456.49 $20,456.49 $15,900.00 $22.000.00 $10,000.00 $10,000.00 BID RANKING Apparent Low Bidder s Apparent Low Bidder Sl Apparent Low Bidder 7 Apparent Low Biddere Apparent Low Bidder 9
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES 61.476.883.97 $1,538,341.00 51,879,433.70 $1,898,440.00 $1,950,420.00
TOTAL BID AMOUNT INDICATED BY BIDDER 51,476,883.97 $1,698,440.00 $1,538,341.00 $1,879,433.70 $1,950,420.00
CALCULATION CORRECTIONS TO BID AMOUNT SUBMTTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT $0.00 $0.00 $0.00 $0.00 $0.00
:\ENGINEERING\Capital Improvement Projects\Active Projects\Street\SS04-009 - State Street\01-PHASE-1\0. Capital Project Filing\50 Contract Management\50.06 Bids Receiveo\Bld Analysis_ for printingBID TABULATION 1 of 1