1. BID TABULATION
PROJECT NAME: Construction of a Raised Median Island Along Kendall Drive Between H Street and E Street, CIP No SS22-004 Contract Specification No. 13575 PROJECT NO: 8825

BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2 Apparent Low Bidder 3 Apparent Low Bidder 4 Apparent Low Bidder 5 Apparent Low Bidder 6 Apparent Low Bidder 7 Apparent Low Bidder 8 Apparent Low Bidder 9 Vance Corporation All American Asphalt Aneen Construction, Inc. KASA Construction, Inc. Hardy & Harper, Inc. Tryco General Engineering LCR Earthwork & Engineering, Corp. Toro Enterprises, Inc. Roadway Engineering & Construction Corp.

Bid Item and Description Quantit
y Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Mobilization 1 LS $305,000.00 $305,000.00 $365,000.00 $365,000.00 $94,882.00 $94,882.00 $425,000.00 $425,000.00 $100,000.00 $100,000.00 $180,000.00 $180,000.00 $150,000.00 $150,000.00 $395,000.0 0 $395,000.00 $100,000.00 $100,000.00
2 Clearing & grubbing unclassified excavation & unclassified fill 1 LS $73,781.00 $73,781.00 $25,000.00 $25,000.00 $70,000.00 $70,000.00 $290,000.00 $290,000.00 $106,973.45 $106,973.45 $ 48,000.00 $48,000.00 $75,000.00 $75,000.00 $100,500.0 0 $100,500.00 $75,000.00 $75,000.00
3 Storm Water Pollution and Prevention Plan (SWPPP) and NPDES Compliance 1 LS $17,681.00 $17,681.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $27,000.00 $27,000.00 $ 20,000.00 $20,000.00 $ 25,000.00 $25,000.00 $15,000.00 $15,000.00 $13,235.00 $13,235.00 $40,000.00 $40,000.00 4 Temporary traffic control 1 LS $153,136.00 $153,136.00 $355,000.00 $355,000.00 $130,000.00 $130,000.00 $150,000.00 $150,000.00 $300,000.00 $300,000.00 $ 60,000.00 $60,000.00 $200,000.00 $200,000.00 $147,000.0 0 $147,000.00 $50,000.00 $50,000.00
5 Sawcut, remove and dispose of existing AC pavement 30,958 SF $ 1.33 $41,174.14 $ 3.30 $102,161.40 $ 3.50 $108,353.00 $ 5.00 $154,790.00 $ 3.50 $108,353.00 $ 0.50 $15,479.00 $5.00 $154,790.00 $1.20 $37,149.60 $1.00 $30,958.00 6 Sawcut, remove, and dispose of existing concrete curb & gutter 90 LF $ 32.00 $2,880.00 $ 15.00 $1,350.00 $ 100.00 $9,000.00 $ 28.00 $2,520.00 $ 45.00 $4,050.00 $ 29.00 $2,610.00 $20.00 $1,800.00 $21.35 $1,921.50 $15.00 $1,350.00 7 Sawcut, remove, and dispose of existing masonry stone curb & gutter 7 LF $ 72.00 $504.00 $ 27.00 $189.00 $ 500.00 $3,500.00 $ 150.00 $1,050.00 $ 90.00 $630.00 $ 200.00 $1,400.00 $100.00 $700.00 $51.50 $360.50 $50.00 $350.00 8 Sawcut, remove, and dispose of existing concrete sidewalk 152 SF $ 8.40 $1,276.80 $ 3.00 $456.00 $ 20.00 $3,040.00 $ 18.00 $2,736.00 $ 10.00 $1,520.00 $ 28.00 $4,256.00 $5.00 $760.00 $4.50 $684.00 $4.00 $608.00 9 Cold mill existing AC pavement to a depth of 2" 127,27 3 SF $ 0.32 $40,727.36 $ 0.53 $67,454.69 $ 0.40 $50,909.20 $ 0.52 $66,181.96 $ 0.45 $57,272.85 $ 0.45 $57,272.85 $0.35 $44,545.55 $0.30 $38,181.90 $0.47 $59,818.31 10 Cold mill existing AC pavement to a depth of 3" 26,626 SF $ 0.37 $9,851.62 $ 0.63 $16,774.38 $ 0.70 $18,638.20 $ 0.55 $14,644.30 $ 0.45 $11,981.70 $ 0.50 $13,313.00 $0.50 $13,313.00 $0.50 $13,313.00 $0.48 $12,780.48 11 Remove and dispose of existing catch basin (depth to be verified in the field). 1 EA $ 8,904.00 $8,904.00 $ 2,700.00 $2,700.00 $10,000.00 $10,000.00 $ 1,000.00 $1,000.00 $ 2,500.00 $2,500.00 $ 5,800.00 $5,800.00 $5,000.00 $5,000.00 $1,600.00 $1,600.00 $7,500.00 $7,500.00 12 Sawcut, remove, and dispose of existing 18" RCP pipe 2 LF $ 2,234.00 $4,468.00 $ 590.00 $1,180.00 $ 1,000.00 $2,000.00 $ 500.00 $1,000.00 $ 600.00 $1,200.00 $ 900.00 $1,800.00 $200.00 $400.00 $1,010.00 $2,020.00 $1,500.00 $3,000.00 13 Construct type "A" PCC curb only with 8" CF per City Std. Plan 200.

Place 4” thick class II cab under curb 3,343 LF $ 30.00 $100,290.00 $ 35.00 $117,005.00 $ 50.00 $167,150.00 $ 28.00 $93,604.00 $ 30.00 $100,290.00 $ 79.00 $264,097.00 $65.00 $217,295.00 $24.55 $82,070.65 $80.00 $267,440.00 14 Construct type "B" PCC curb & gutter with 8" CF per City Std. Plan 200.

Place 4” thick class II cab under curb & gutter 366 LF $ 60.00 $21,960.00 $ 73.00 $26,718.00 $ 70.00 $25,620.00 $ 50.00 $18,300.00 $ 50.00 $18,300.00 $ 88.00 $32,208.00 $95.00 $34,770.00 $46.10 $16,872.60 $65.00 $23,790.00 15 Construct grouted river rock between median curbs per City Std. Plan 206 and detail on sheet 4 12,500 SF $ 26.00 $325,000.00 $ 25.00 $312,500.00 $ 30.00 $375,000.00 $ 15.00 $187,500.00 $ 25.00 $312,500.00 $ 15.00 $187,500.00 $10.00 $125,000.00 $14.70 $183,750.00 $27.00 $337,500.00 16 Construct 12” wide strip of full depth AC pavement per detail on sheet 3 8,300 LF $ 11.00 $91,300.00 $ 16.71 $138,693.00 $ 13.00 $107,900.00 $ 16.00 $132,800.00 $ 12.00 $99,600.00 $ 6.50 $53,950.00 $10.00 $83,000.00 $11.45 $95,035.00 $15.00 $124,500.00 17 Construct AC pavement join at sawcut line per detail on sheet 3 8,678 LF $ 1.20 $10,413.60 $ 2.40 $20,827.20 $ 13.00 $112,814.00 $ 4.00 $34,712.00 $ 3.00 $26,034.00 $ 7.50 $65,085.00 $3.00 $26,034.00 $2.30 $19,959.40 $4.00 $34,712.00 18 Construct PCC median curb & gutter with 8" CF per detail on sheet 3.

Gutter width=12". Place 4" thick class II cab under curb & gutter 3,115 LF $ 40.00 $124,600.00 $ 41.00 $127,715.00 $ 70.00 $218,050.00 $ 37.00 $115,255.00 $ 50.00 $155,750.00 $ 86.00 $267,890.00 $85.00 $264,775.00 $32.20 $100,303.00 $80.00 $249,200.00 19 Construct modified type "B" PCC curb & gutter with 8" CF per detail on sheet 3. Gutter Width=18". Place 4" thick class II cab under curb & gutter 527 LF $ 60.00 $31,620.00 $ 71.00 $37,417.00 $ 65.00 $34,255.00 $ 50.00 $26,350.00 $ 50.00 $26,350.00 $ 89.00 $46,903.00 $85.00 $44,795.00 $46.10 $24,294.70 $65.00 $34,255.00 20 Construct 15' curb opening with 3' wide PCC ribbon gutter per detail on sheet 3. Place 4" thick class II cab under ribbon gutter 90 SF $ 24.00 $2,160.00 $ 28.00 $2,520.00 $ 100.00 $9,000.00 $ 25.00 $2,250.00 $ 25.00 $2,250.00 $ 68.00 $6,120.00 $45.00 $4,050.00 $39.35 $3,541.50 $80.00 $7,200.00 21 Construct 6" removable locking bollard with embedment sleeve and cement foundation per detail on shtee 3 6 EA $ 1,920.00 $11,520.00 $ 2,200.00 $13,200.00 $ 2,500.00 $15,000.00 $ 1,800.00 $10,800.00 $ 2,500.00 $15,000.00 $ 1,200.00 $7,200.00 $2,000.00 $12,000.00 $2,225.00 $13,350.00 $1,500.00 $9,000.00 22 Construct PCC median curb with reversed sloping gutter per detail on sheet 3. Gutter width=12". Place 4" thick class II cab under curb & gutter 200 LF $ 60.00 $12,000.00 $ 63.00 $12,600.00 $ 90.00 $18,000.00 $ 50.00 $10,000.00 $ 50.00 $10,000.00 $ 82.00 $16,400.00 $95.00 $19,000.00 $32.95 $6,590.00 $65.00 $13,000.00 23 Construct type 1 local depression per City Std. Plan 407. Place 4" thick class II cab under local depression 4 EA $ 900.00 $3,600.00 $ 4,800.00 $19,200.00 $ 6,000.00 $24,000.00 $ 875.00 $3,500.00 $ 4,500.00 $18,000.00 $ 5,680.00 $22,720.00 $15,000.00 $60,000.00 $2,425.00 $9,700.00 $5,200.00 $20,800.00 24 Construct 2" AC overlay with asphalt reinforcing fibers 1,435 TN $ 160.00 $229,600.00 $ 136.82 $196,336.70 $ 146.00 $209,510.00 $ 200.00 $287,000.00 $ 135.00 $193,725.00 $ 158.00 $226,730.00 $150.00 $215,250.00 $135.60 $194,586.00 $165.00 $236,775.00 25 Construct 3" AC overlay with asphalt reinforcing fibers 481 TN $ 214.00 $102,934.00 $ 136.82 $65,810.42 $ 146.00 $70,226.00 $ 200.00 $96,200.00 $ 135.00 $64,935.00 $ 159.00 $76,479.00 $150.00 $72,150.00 $135.85 $65,343.85 $170.00 $81,770.00 26 Construct variable thickness AC overlay (2” to 8”) with asphalt reinforcing fibers 308 TN $ 256.00 $78,848.00 $ 136.82 $42,140.56 $ 146.00 $44,968.00 $ 300.00 $92,400.00 $ 135.00 $41,580.00 $ 159.00 $48,972.00 $165.00 $50,820.00 $135.50 $41,734.00 $170.00 $52,360.00 27 Construct 0.85’ deep lift AC with asphalt reinforcing fibers 65 TN $ 237.00 $15,405.00 $ 574.28 $37,328.20 $ 225.00 $14,625.00 $ 300.00 $19,500.00 $ 275.00 $17,875.00 $ 200.00 $13,000.00 $250.00 $16,250.00 $213.60 $13,884.00 $200.00 $13,000.00 28 Construct concrete sidewalk per City Std. Plan 202 152 SF $ 8.40 $1,276.80 $ 14.00 $2,128.00 $ 50.00 $7,600.00 $ 20.00 $3,040.00 $ 15.00 $2,280.00 $ 22.00 $3,344.00 $15.00 $2,280.00 $9.50 $1,444.00 $12.00 $1,824.00 29 Construct AC pavement restoration for trenches per City Std. Plan 310 20 TN $ 1,248.00 $24,960.00 $ 590.00 $11,800.00 $ 600.00 $12,000.00 $ 1,000.00 $20,000.00 $ 600.00 $12,000.00 $ 240.00 $4,800.00 $300.00 $6,000.00 $595.00 $11,900.00 $200.00 $4,000.00 30 Construct 6” thick PCC curb channel with 8” CF per detail 1 on sheet 3.

Place 4” thick class II cab under curb channel 103 SF $ 30.00 $3,090.00 $ 46.00 $4,738.00 $ 100.00 $10,300.00 $ 40.00 $4,120.00 $ 25.00 $2,575.00 $ 149.00 $15,347.00 $45.00 $4,635.00 $44.90 $4,624.70 $80.00 $8,240.00 31 Construct case E local depression per SPPWC Std. Plan 313-4. Place 4” thick class II cab under local depression 2 EA $ 900.00 $1,800.00 $ 4,300.00 $8,600.00 $ 7,000.00 $14,000.00 $ 875.00 $1,750.00 $ 4,000.00 $8,000.00 $ 5,480.00 $10,960.00 $15,000.00 $30,000.00 $1,170.00 $2,340.00 $4,600.00 $9,200.00 32 Construct grouted Rip-Rap with 6" max. round rock, dimensions per plan. 170 SF $ 24.00 $4,080.00 $ 227.00 $38,590.00 $ 20.00 $3,400.00 $ 35.00 $5,950.00 $ 225.00 $38,250.00 $ 158.00 $26,860.00 $20.00 $3,400.00 $39.65 $6,740.50 $240.00 $40,800.00 33 Install 4" schedule 80 PVC pipe, trench and pipe bedding per City Std.

Plan No. 306 61 LF $ 192.00 $11,712.00 $ 313.00 $19,093.00 $ 100.00 $6,100.00 $ 155.00 $9,455.00 $ 300.00 $18,300.00 $ 89.00 $5,429.00 $25.00 $1,525.00 $121.00 $7,381.00 $334.00 $20,374.00 34 Install 18" HDPE. Trench and pipe bedding per manufacturer’s specifications 6 LF $ 628.00 $3,768.00 $ 1,880.00 $11,280.00 $ 1,000.00 $6,000.00 $ 585.00 $3,510.00 $ 1,800.00 $10,800.00 $ 800.00 $4,800.00 $300.00 $1,800.00 $734.00 $4,404.00 $2,000.00 $12,000.00 35 Install 24" HDPE. Trench and pipe bedding per manufacturer’s specifications 114 LF $ 574.00 $65,436.00 $ 1,390.00 $158,460.00 $ 150.00 $17,100.00 $ 340.00 $38,760.00 $ 1,300.00 $148,200.00 $ 348.00 $39,672.00 $250.00 $28,500.00 $238.00 $27,132.00 $1,480.00 $168,720.00 36 Install 48" HDPE. Trench and pipe bedding per manufacturer’s specifications 229 LF $ 687.00 $157,323.00 $ 1,400.00 $320,600.00 $ 150.00 $34,350.00 $ 525.00 $120,225.00 $ 1,325.00 $303,425.00 $ 365.00 $83,585.00 $325.00 $74,425.00 $342.00 $78,318.00 $1,500.00 $343,500.00 37 Install 18" RCP (1500 D-Load). Trench and pipe bedding per City Std.

Plan No. 306 560 LF $ 617.00 $345,520.00 $ 1,060.00 $593,600.00 $ 200.00 $112,000.00 $ 300.00 $168,000.00 $ 1,000.00 $560,000.00 $ 298.00 $166,880.00 $350.00 $196,000.00 $324.00 $181,440.00 $1,140.00 $638,400.00 38 Construct catch basin No. 1 per City Std. Plan No. 403 (Width=7’) 1 EA $35,599.00 $35,599.00 $22,300.00 $22,300.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 $26,000.00 $26,000.00 $7,500.00 $7,500.00 $11,700.00 $11,700.00 $24,000.00 $24,000.00 39 Construct catch basin No. 3 per City Std. Plan No. 405 (Width=7’) 1 EA $35,599.00 $35,599.00 $22,300.00 $22,300.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 $25,000.00 $25,000.00 $8,000.00 $8,000.00 $13,300.00 $13,300.00 $24,000.00 $24,000.00 40 Construct catch basin No. 3 per City Std. Plan No. 405 (Width=14’) 3 EA $45,626.00 $136,878.00 $31,000.00 $93,000.00 $20,000.00 $60,000.00 $27,000.00 $81,000.00 $30,000.00 $90,000.00 $21,000.00 $63,000.00 $15,000.00 $45,000.00 $23,855.00 $71,565.00 $33,400.00 $100,200.00 41 Install 18" corrugated metal pipe (C.M.P.) 16 gage metal 3 LF $ 686.00 $2,058.00 $ 1,000.00 $3,000.00 $ 1,000.00 $3,000.00 $ 1,000.00 $3,000.00 $ 1,000.00 $3,000.00 $ 900.00 $2,700.00 $500.00 $1,500.00 $1,472.00 $4,416.00 $1,100.00 $3,300.00 42 Install 24" corrugated metal pipe (C.M.P.) 16 gage metal 4 LF $ 713.00 $2,852.00 $ 1,000.00 $4,000.00 $ 1,000.00 $4,000.00 $ 650.00 $2,600.00 $ 1,000.00 $4,000.00 $ 1,000.00 $4,000.00 $500.00 $2,000.00 $1,235.00 $4,940.00 $1,100.00 $4,400.00 43 Construct manhole No. 2 per City Std. Plan No. 415, see profile for lid type - see additional detail on sheet 9 1 EA $26,948.00 $26,948.00 $26,800.00 $26,800.00 $10,000.00 $10,000.00 $35,000.00 $35,000.00 $25,000.00 $25,000.00 $39,880.00 $39,880.00 $9,000.00 $9,000.00 $20,045.00 $20,045.00 $28,600.00 $28,600.00 44 Construct modified catch basin No. 3 per detail on sheet 3 and City Std.

Plan No. 405 (Width=10’) 2 EA $39,771.00 $79,542.00 $26,800.00 $53,600.00 $15,000.00 $30,000.00 $25,000.00 $50,000.00 $25,000.00 $50,000.00 $21,000.00 $42,000.00 $10,000.00 $20,000.00 $15,155.00 $30,310.00 $28,600.00 $57,200.00 45 Construct concrete collar per City Std. Plan No. 412 1 EA $ 5,560.00 $5,560.00 $ 4,400.00 $4,400.00 $ 5,000.00 $5,000.00 $ 1,900.00 $1,900.00 $ 4,500.00 $4,500.00 $ 4,800.00 $4,800.00 $2,000.00 $2,000.00 $3,850.00 $3,850.00 $4,800.00 $4,800.00 46 Connect HDPE pipe to concrete structure with water tight gasket & non- shrink grout per manufacturer’s specifications 8 EA $ 3,485.00 $27,880.00 $ 5,200.00 $41,600.00 $ 5,000.00 $40,000.00 $ 1,400.00 $11,200.00 $ 5,000.00 $40,000.00 $ 1,980.00 $15,840.00 $750.00 $6,000.00 $995.00 $7,960.00 $5,600.00 $44,800.00 47 Connect RCP pipe to concrete catch basin/junction structure. Outlet pipe join shall be water tight with non-shrink grout 14 EA $ 3,525.00 $49,350.00 $ 5,200.00 $72,800.00 $ 5,000.00 $70,000.00 $ 1,500.00 $21,000.00 $ 5,000.00 $70,000.00 $ 2,000.00 $28,000.00 $500.00 $7,000.00 $3,855.00 $53,970.00 $5,600.00 $78,400.00 48 Install Brooks 3636 CB drain inlet (or approved equal), with 3636 steel traffic rated grate (1-PC. Bolted down) 1 EA $21,510.00 $21,510.00 $13,200.00 $13,200.00 $15,000.00 $15,000.00 $ 6,400.00 $6,400.00 $13,000.00 $13,000.00 $ 7,280.00 $7,280.00 $4,000.00 $4,000.00 $7,600.00 $7,600.00 $14,100.00 $14,100.00 49 Install 24" corrugated metal pipe (C.M.P.) riser with cage inlet 1 EA $15,865.00 $15,865.00 $26,800.00 $26,800.00 $ 7,000.00 $7,000.00 $ 8,000.00 $8,000.00 $25,000.00 $25,000.00 $10,800.00 $10,800.00 $5,000.00 $5,000.00 $5,095.00 $5,095.00 $28,600.00 $28,600.00 50 Install 36" corrugated metal pipe (C.M.P.) riser with cage inlet 1 EA $17,366.00 $17,366.00 $28,300.00 $28,300.00 $ 7,000.00 $7,000.00 $14,000.00 $14,000.00 $27,000.00 $27,000.00 $12,800.00 $12,800.00 $5,000.00 $5,000.00 $4,415.00 $4,415.00 $30,000.00 $30,000.00 51 Construct 4” drain outlet per detail 57 on sheet 9 1 EA $ 4,266.00 $4,266.00 $22,600.00 $22,600.00 $ 1,500.00 $1,500.00 $ 500.00 $500.00 $21,000.00 $21,000.00 $ 4,800.00 $4,800.00 $500.00 $500.00 $9,925.00 $9,925.00 $2,400.00 $2,400.00 52 Install 1/4" thick galvanized steel restrictor plate set over 18" storm drain outlet opening mounted with stainless steel L bolts and 1/4" dia.

Stainless steel hex. head nuts per detail No. 58 on sheet 9 1 EA $ 6,180.00 $6,180.00 $ 6,700.00 $6,700.00 $ 7,500.00 $7,500.00 $ 1,500.00 $1,500.00 $ 7,000.00 $7,000.00 $ 5,980.00 $5,980.00 $3,500.00 $3,500.00 $2,150.00 $2,150.00 $7,200.00 $7,200.00 53 Construct 8" concrete masonry retaining wall per City Std. Plan No. 5.9 (sloping backfill) 40 SF $ 90.00 $3,600.00 $ 440.00 $17,600.00 $ 500.00 $20,000.00 $ 175.00 $7,000.00 $ 400.00 $16,000.00 $ 210.00 $8,400.00 $500.00 $20,000.00 $440.00 $17,600.00 $450.00 $18,000.00 54 Signing and striping per plans and specifications 1 LS $21,536.00 $21,536.00 $27,000.00 $27,000.00 $35,000.00 $35,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $29,000.00 $29,000.00 $27,000.00 $27,000.00 $57,000.00 $57,000.00 $29,000.00 $29,000.00 55 Replace traffic signal loop detectors per plans and specifications 1 LS $ 7,199.00 $7,199.00 $ 5,830.00 $5,830.00 $ 7,820.00 $7,820.00 $ 7,900.00 $7,900.00 $ 5,000.00 $5,000.00 $19,800.00 $19,800.00 $7,500.00 $7,500.00 $6,655.00 $6,655.00 $9,500.00 $9,500.00 56 Construct 4’ x 8’ Project Sign. See info in Appendix 2 EA $ 1,800.00 $3,600.00 $ 2,800.00 $5,600.00 $ 2,000.00 $4,000.00 $ 2,200.00 $4,400.00 $ 2,500.00 $5,000.00 $ 2,400.00 $4,800.00 $2,500.00 $5,000.00 $1,500.00 $3,000.00 $1,000.00 $2,000.00 57 Furnish and install new concrete light poles on the existing foundations, including the mast arm and solar lighting fixture, in accordance with plans and specifications
2 EA $ 4,799.00 $9,598.00 $16,000.00 $32,000.00 $13,519.00 $27,038.00 $ 8,700.00 $17,400.00 $16,000.00 $32,000.00 $16,800.00 $33,600.00 $13,000.00 $26,000.00 $16,400.00 $32,800.00 $15,000.00 $30,000.00 58 Remove the existing streetlights, furnish and install new solar lighting in accordance with plans and specifications 9 EA $ 4,199.00 $37,791.00 $11,800.00 $106,200.00 $ 4,917.00 $44,253.00 $ 9,700.00 $87,300.00 $12,000.00 $108,000.00 $ 8,700.00 $78,300.00 $5,000.00 $45,000.00 $11,858.00 $106,722.00 $4,500.00 $40,500.00 59 Remove and dispose the existing lids on all electrical pull boxes and construct new concrete covers in accordance with plans and specifications
17 EA $ 360.00 $6,120.00 $ 730.00 $12,410.00 $ 415.76 $7,067.92 $ 600.00 $10,200.00 $ 1,000.00 $17,000.00 $ 450.00 $7,650.00 $450.00 $7,650.00 $729.00 $12,393.00 $400.00 $6,800.00 BID RANKING Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
Apparent Low
Bidder 4
Apparent Low
Bidder 5
Apparent Low
Bidder 6
Apparent Low
Bidder 7
Apparent Low
Bidder 8 Apparent Low Bidder 9
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES $2,996,497.32 $3,944,205.55 $2,614,469.32 $3,076,203.26 $3,550,000.00 $2,586,291.85 $2,519,212.55 $2,435,115.40 $3,721,524.79 TOTAL BID AMOUNT INDICATED BY BIDDER $2,997,932.32 $3,944,205.55 $2,465,441.40 $3,076,203.26 $3,550,000.00 $2,586,292.58 $2,519,212.55 ########## $3,721,524.79

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT -$1,435.00 $0.00 $149,027.92 $0.00 $0.00 -$0.73 $0.00 $0.00 $0.00 ADDITIVE ALTERNATE #1
A1 Furnish new solar lighting fixtures per specifications and deliver them to the city yard location 12 EA $ 2,999.00 $35,988.00 $ 4,500.00 $54,000.00 $ 3,430.00 $41,160.00 $ 6,500.00 $78,000.00 $ 6,500.00 $78,000.00 $ 6,800.00 $81,600.00 $ 4,000.00 $48,000.00 $4,530.00 $54,360.00 $ 4,000.00 $48,000.00 ADDITIVE ALTERNATE # TOTAL
$35,988.00 $54,000.00 $41,160.00 $78,000.00 $78,000.00 $81,600.00 $48,000.00 $54,360.00 $48,000.00 BASE BID + ADDITIVE ALTERNATVE TOTAL
$3,032,485.32 $3,998,205.55 $2,655,629.32 $3,154,203.26 $3,628,000.00 $2,667,891.85 $2,567,212.55 $2,489,475.40 $3,769,524.79

IS THE BIDDER QUALIFIED BASED ON REFERENCE PROJECTS
SUBCONTRACTOR % AND AMOUNT SHOWN IN THE BID
BID TABULATION 1 of 9

2. REVIEW OF APPARENT LOW BID
APPARENT LOW BID SUBMITTED BY: Toro Enterprises, Inc. APPARENT LOW BID AMOUNT:

ITEM REVIEWED/CHECKED REVIEW RESULT BY DATE REMARKS
BID STAMPED AS RECEIVED PRIOR BID TIME: Yes Mohammad Alkhateeb####### #
BID BOND IN PROPER AMOUNT: Yes Mohammad Alkhateeb####### #
ADDENDA ACKNOWLEDGEMENT: Yes Mohammad Alkhateeb#######
#
TOTAL BID PRICES CALCULATED CORRECTLY: Yes Mohammad Alkhateeb####### #
SUBCONTRACTOR AMOUNT:

MIN PRIME CONTRACTOR % REQUIREMENT FOR WORK PER SPECIFICATIONS:

PRIME CONTRACTOR % CALCULATED PER BID SUBMITTAL (THIS % MUST BE EQUAL OR MORE THAN ABOVE %):

BIDDER COMPLIES WITH MIN PRIME CONTRACTOR % REQUIREMENT:

MAX ALLOWABLE SUBCONTRACTOR PERCENT PER SPECIFICATIONS:

SUB CONTRACTOR % CALCULATED PER BID SUBMITTAL (THIS % MUST BE EQUAL OR LESS THAN ABOVE %):

BIDDER COMPLIES WITH MAX. SUB CONTRACTOR % REQUIREMENT:

PRIME CONTRACTOR LICENSE STATUS:

Toro Enterprises, Inc.

Current and active till
08/31/2027 Mohammad Alkhateeb#######
# Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) PRIME CONTRACTOR DIR REGISTRATION STATUS: Active till 6/30/2028 Mohammad Alkhateeb####### # Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp) SUB CONTRACTOR LICENSE STATUS: ELECNOR BELCO

ELECTRIC INC
Current and active till
07/31/2027 Mohammad Alkhateeb#######
# Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) SUB CONTRACTOR DIR REGISTRATION STATUS: Active till 06/30/2028 Mohammad Alkhateeb####### # Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp) SUB CONTRACTOR LICENSE STATUS: RUBBERIZED

CRACKFILLER

SEALANT INC
Current and active till
11/30/2026 Mohammad Alkhateeb#######
#
SUB CONTRACTOR DIR REGISTRATION STATUS: Active till 06/30/2026 Mohammad Alkhateeb####### #
SUB CONTRACTOR LICENSE STATUS:

CINDY TRUMP INC
Current and active till
09/30/2026 Mohammad Alkhateeb#######
#
SUB CONTRACTOR DIR REGISTRATION STATUS: Active till 06/30/2026 Mohammad Alkhateeb####### #
SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

REVIEW OF APPARENT LOW BID 2 of 9
SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

SUB CONTRACTOR LICENSE STATUS:

SUB CONTRACTOR DIR REGISTRATION STATUS:

PRIME CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:PRIME CONTRACTOR DEBARMENT STATUS FROM FEDERAL CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:

REVIEW OF APPARENT LOW BID 3 of 9

SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS:SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS:

REFERENCE CHECK ACCEPTABLE:

REVIEW OF APPARENT LOW BID 4 of 9

2. REVIEW OF APPARENT LOW BID

REMARKS
Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp) Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) Print-out from DIR Web Page attached (https://services.dir.ca.gov/gsp) $2,435,115.40
REVIEW OF APPARENT LOW BID 5 of 9
REVIEW OF APPARENT LOW BID 6 of 9
REVIEW OF APPARENT LOW BID 7 of 9

3. REFERENCE CHECK OF APPARENT LOW BIDDER

REFERENCE DATA FOR APPARENT LOW BIDDER REFERENCE CHECK FOR APPARENT LOW BIDDER

CHECKED BY
DATE
Answer "YES" if satisfied or "NO" if not satisfied

REFERENCE PROJECT OWNER AND REFERENCE

NAME TEL
AMOUNT

DATE COMPLETED

DID THE CONTRACTOR DO

QUALITY WORK

DID THE CONTRACTOR STAY

ON SCHEDULE

DID THE CONTRACTOR ASK

FOR UNNECESSARY CHANGE
ORDERS

DID THE CONTRACTOR FILE

CLAIMS AGAINST YOU

WILL YOU HIRE THE

CONTRACTOR AGAIN REMARKS
Community Beautification City of Glendale
Sarkis Oganesyan 818-548-3945 $
8,356,287.95 Apr-24 Yes Yes No No Yes
Sarkis was unavailable, and
Victorya Pakhanyan took the call
and provided the feedback. They
are very satisfied with his work
Mohammad
Alkhateeb
12/17/2025
Lawrence & Teller Improvements City of Thousand Oaks
Masoud Razavi 805-449-2454 $
1,865,987.00 Aug-22 - - - - -
No feedback received. I called
the reference twice on separate
days and left voicemails;
however, I have not received a
return call.

Mohammad
Alkhateeb
12/19/2025
Overlay D City of Santa Clarita
Ramiro Fuentes 661-286-4134 $9,099,917.80 Oct-22 Yes Yes No No Yes Very satisfied with his work.

Mohamm
ad
Alkhateeb
12/19/202
5 Harvard Blvd Sewer Pipeline and
Water Mainline Replacement
Project
City of Santa Paula
Jon Turner 805-850-8562 ############ Jan-24 Yes Yes No No Yes Very satisfied with his work. The
City has two (2) ongoing
projects with the contractor.

Mohamm
ad
Alkhatee
b
#######
#
REF CHECK 8 of 9

4. LOWEST RESPONSIBLE BID
LOWEST RESPONSIBLE BID SUBMITTED BY: Toro Enterprises, Inc.

IN THE AMOUNT OF: $2,435,115.40
LOWEST RESPONSIBLE BID 9 of 9