Sl!l SCflEULE BUILDING
'PROJf.CT NAME: HomeJei.:s N.11..,lgaflon Cttntt,r C~mp~u• CfJEN1':

City of San 8crnard1n1>
PROJECT No GB24 010
LOCATION· 796 6th St San Be1,1aidino, CA a2~10
BIO OPENING DATE· January 13 2 026
No. Div 0.scri lJtion
I
8 00100 General Requi1•m11nts
0130 00 Administrative Requirements
0140 00 Quality Control, Testing and Commissioning
0150 00 Temporary Facilities and Controls
0190 00
Life Cycle Activities-Includes commissioning of furnished and installed equipment as required by p,oject plans, specifications or applicable codes and standards
1J 00300 concrote
0310 00
Concrete Formfng and Accessories-For Reinforced Concrete Foundation-Front Offices and Communal Spaces 0310 00 Concrete Forming and Accessories-For Reinforced Concrete Foundation-Flex Space 031000
COncrete Forming and Accessories-For Reinforced Concrete Foundation•lounge, Storage end Hot Bo)( 031000 Concrete Forming and Accessories-For Reinforced Concrete Foundatlons•Offices 031000 Concrete Forming and Accessories-For Reinforced Concrete Foundation•Med Congregate Beds 1 031000 Concrete Forming and Accessories.-For Reinforced Concrete Foundation• Triage/Medical Beds 031000 Concrete Forming and Accessories.For Reinforced Concrete Foundation•Kitchen/Dining 0310 00 Concrete Forming and Accessories-For Reinforced Concrete Foundation.Congregate Beds 1 031000 Concrete Forming and Accessories.For Reinforced Concrete Foundation.Congregate Beds 2 0310 00 Concrete Forming and Accessories.For Reinforced Concrete Foundation•lndividual Sleeping Units 03 10 00 Concrete Forming and Accessories-For Reinforced Concrete Foundation-Dog Wash 0310 00 Concrete Forming and Accessories-For Relnforced Concrete Foundation-Dog Kennel 031000 Concrete Forming and Accessories-For Reinforced Concrete Foundation-Storage 031519 Furnish and Install Cast-in-Concrete Base Plates-Front Offices and Communal Spaces 031519 Furnish and Install Cast-in-Concrete Base Plates-Flex Space 031519 Furnish and Install Cast-in-Concrete Base Plates•Lounge, Storage and Hot Box 031519 Furnish and Install Cast-in.concrete Base Plates-Offices 031519 Furnlsh and Install cast-in-Concrete Base Plates,.Med Congregate Beds 1 031519 Furnish and Install cast-in-Concrete Base Plates-TriageMedical Beds 031519 Furnish and Install Cast-in-Concrete Base Plates-Kitchen/Dining 031519 Furnish and Install Cast.in-Concrete Base Plates--Congregate Beds 1 031519 Furnish and Install Cast-in-Concrete Base Plates-Congregate Beds 2 03 15 19 Furnish and Install cast-in-concrete Base Plate~ndividual Sleeping Units 03 15 19 Furnish and Install cast-in-concrete Base Plates-Dog wash 03 JS 19 Furnish and Install cast-in-concrete Base Plates-Dog Kennel 03 15 19 Furnish ,ind Install Cast.in-Concrete B;ise Plates-Storage 03 30 IIO Furnish and Install Anchor straps-Front Offices and Communal Sp;ices OJ 30 011 Furnish and Install Anchor Straps-Flex Space
03 30 011 Furnish and Install Anchor Straps-lounge, Storage and Hot Bo)( 03 30110 Furnish and Install Anchor Straps-Offices
113 30 on Furnish and Install Anchor Straps-Med Congregate Beds 1 Qty Unit Contractor's Bid
Unit Price Amount
1 LS $796,000.00 $796,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
1,243 SF $35,00 $43,505.00
965 SF $35.00 $33,775.00
1,073 SF $35.00 $37,555.00
871 SF $35.00 $30,485.00
1,056 SF $35,00 $36,960.00
807 SF $35.00 $28,245.00
916 SF $35.00 $32,060.00
1,950 SF $35,00 $68,250.00
938 SF $35.00 $32,830.00
5,661 SF $35,00 $ I 98,135.00
566 SF $35.00 $19,810.00
566 SF $35.00 $19,810.00
566 SF $35.00 $19,810.00
34 EA $750.00 $25,500.00
15 EA $750.00 $11,250.00
24 EA $750.00 $18,000.00
26 EA $750.00 $19,500.00
26 EA $750,00 $19,500.00
23 EA $750,00 $17,250.00
28 EA $750.00 $21,000.00
63 EA $750.00 $47,250.00
22 EA $750,00 $16,500.00
90 EA $750.00 $67,500.00
4 EA $750.00 $3,000.00
4 EA $750.00 $3,000.00
4 EA $750.00 $3,000.00
34 EA $135.00 $4,590.00
25 EA $585.00 $14,625.00
29 EA $585.00 $16,965.00
10 EA $585.00 $5,850.00
8 EA $585.00 $4,680.00
OJ 311011 Furnish and Install Anchor Straps. Triag8/Medical Beds JS EA $585 .00 $8,775.00 UJ 3000 Furnish and Install Anchor Sbaps-Kilchen,t)jnjng 20 EA $585.00 $11,700.00 03 30 00 Furnish ~nd lns1all Anchor Slr;lps-Congregate Beds 1 47 EA $585.00 $27,495.00 03 311011 Furnish and Install Anchor Straps-Congregate Beds 2 22 EA $585.00 $12,870.00 03 30 no Furnish and Install Anchor Straps-lndMdual Sleeping Units 1711 EA $585.00 $99,450.00 03 311110 Furnish and Install Anchor Straps-Dog Wash 14 EA $585.00 $8,190.00 03 311110 Furnish and lnstan Anchor Straps-Dog Kennel 14 EA $585.00 $8,190.00 03 31100 Furnish and lnsta" Anchor straps,-Slorage 14 EA $585.00 $8,190.00 Furnish and Install Cast.In-Place Reinforced Concrete Foundation.front Offices and Communal Spaces $135.00 03 30110 30 $4,050.00
CY
03 311110 Furnish and Install Cast-fo-Pfoce Reinforced Concre1e Foundation-Flex Space 24 $135.00 $3,240 .00 CY
03 30 00 Furnish and lnstaR cast.Jn.ptace Reinforced Concrete Foundation.Lounge, storage and Hot Sox 13 CY $135.00 $2,430.00 03 30 IKI Furnish and Install Cast-~..Place Reinforced Concre1e Foundaion.-Offices 13 $135 .00 $2,430.00 0 OJ 3000 FurnJsh and lnst8'/ Cast-In-Place Reinforced Concrete Foundation.Med Congregate Beds 1 20 $135.00 $2,700.00 C,
03 30 Oil furnish and tnstaa Cast-ln..f>lace Reinforced Concrete Foundation-Triage,1\Aedical Beds IS $135.00 $2,025.00 "
OJ J0 IKI Furnish and lnstaR Cast-ln-Ptact! Reinforced Concrete Foundation--Kachen/Dining 17 $135.00 $2,295.00 er
Ul 30 00 Fumish and Install Casf.ln-fllace Reinforced Concrete Foundation-Congregate Beds 1 35 $ 135.00 $4,725.00 Cf
113 JIJ0II Flrnish and Install Cast-In-Place Reinforced Concrete Foundation.Congregale Beds 2 17 $135.00 $2,295.00 "'
0330110 Furnish and lnstaV Cast-ln4llace Reinrorced Concrete Foundation-Individual Sleepilg Units 154 CY $135.00 $20,790.00 03 31100 Fumish and Install Cast-fn..Plact! Reinforced Concrete Foundation•Oog Wash 9 $135.00 $1,215.00 Cl
03 3000 Furnish and fnstall Cast~n-Place Reinforced Concrete Foundation-Dog Kennel 9 $135.00 $1,215.00 ~
03 30 00 Furnish and lnstaU cast-In-Place Reinforced Concrete Foundation-Storage 9 $135.00 $1 ,215.00 ~
. D0500 Metals $0.00
05 10 U0
Connect Set Modular Units to foundations-Includes required Nute and Bolls-Front Offices and Communal Spaces 34 EA $2,500.00 $85,000.00
OS Ill on Connect Se1 Modular Units to foundations-Includes required Nuts and Bo4ts-Flex Space 15 EA $2,500.00 $37,500.00 05 10 00
Connect Set Modular Units to foundations.Includes requlrod Nuts and Botts.Lounge, storage and Hot Boir 24 EA $2,500.00 $60,000.00
0510 00 Connect Set Modular Units to foundations-Includes required Nuts end Bolts-Offices 26 EA $2,500.00 $65,000.00 0510 00
Connect Set Modular Units to foundatiORS-lncludes ,equi'ed Nuts and Bolts-Med Congregate Beds 1 26 EA $2,500.00 $65,000.00
0510 00 Connect Set Modular Units to fouodaUons-lnciudes required Nuls and Bofts·Triage/Mecftcal Beds 23 EA $2,500.00 $57,500.00 0510 00 Connect Set Modular Units to foundations-Includes required Nuts and Bolls~itch en/Oining 28 EA $2,500.00 $70,000.00 0510 00 Connect Set Modular Unils lo found~nciudes required Nuts and Bolts--Congregate Beds 1 63 EA $2,500.00 $157,500.00 0510 00 COnncct Set Modular Units to foundations-lnciudes required Nuts and Bolts-Congregate Beds 2 22 EA $2,500.00 $55,000.00 0510 00
Connect Set Modular Units to foundations-1ncludes required Nuts and Bolts-lndrvidual Sleeping Units BO EA $2,500.00 $225,000.00
0510 OD Connect Set Modular Unils to foundations-Includes required Nuts and Bolts-Dog Wash 4 EA $2,500.00 $10,000.00 0510 00 Connect Set Modular Uoils to foundaUons-lncludes required Nuts and Bolts-Dog Kennel 4 EA $2,500.00 $10,000.00 0510 00 Connect Set Modular Units lo foundations-Includes required Nuts end Botts-Storage 4 EA $2,500.00 $10,000.00 0510 00
Furnish and Install Top Cotinection Plates including required Nu1s and Bolts•Front Offices and Comrnunal Spaces 45 EA $1,800.00 $81,000.00
051000 Furnish and lnstal Top Connection Plates including required Nuts and ~ls-Flex Space 16 EA $1 ,800.00 $28,800.00 0510 00
Furnish and Install Top Connection Plates including required Nuts and Bolts--Lounge, Storage and Hot Box 30 EA $1,800.00 $54,000.00
0510 00 Furnish and Install Top Connection Plales Including reqJlrod Nuts and Bol1s•Offices 34 EA $1,800.00 $61,200.00 051000 Furnish and lnstan Top Connection Plates inctudiog required Nuts and Bolts-Med Congregate Beds 1 30 EA $1,800.00 $54,000 .00 0510 OD Furnish and Install Top Connection Plates including required Nuts and Bolts--Trfage/Medlcal Beds 27 EA $1,800.00 $48,600.00 0510 00 Fumtsh aoo Install Top Connection Plates Including required Nuts and Botts-KltcheniOnlng 30 EA $1,800.00 $54,000.00 05 10 00 Furnish and Install Top ConnecUon Plates including required Nuts and Bolts-congregate Beds I 90 EA $1,800.00 $162,000.00 05 10 00 Furnish and Install Top Connection Plates includlng required Nuts and Bolls-Congregate Beds 2 18 EA $1,800.00 $32,400.00 OS 10 00
Furnish and lnstaU Top Connection Plates including required Nuts and Sotts-tndMdual Sleeping Unns EA $0.00 $0.00
0510 DD Furnish and Install Top Connection Plates Including required Nuts and Bolts--Dog Wash EA $0.00 $0.00 0510 DD Furnish and Install Top Connection Plates including required Nuls and Bolts-Dog Kennel EA $0.00 $0.00 05 10 OD Furnish and Install Top Connection Plates Including required Nuts and Bolts--Storage EA $0.00 $0.00 • 00600 -wood. PlactJc and Composites $0.00
06 B000
Furnish and Install Exterior Acrylic Fa □ ade-lndudcs required Waterprooling•Front Offices and Communal Spaces ~,384 SF $19.75 $86,584.00
06 B000 Furnish and Install Exterior Acrylic Fal lade-Includes required Waterproofing-Flex Space 3,200 SF $19.75 $63,200.00 06 8000
Furnish and Install Exterior Acrylic Fanede-ln cludes required Waterproofing-Lounge, Storage and Hot Box 3,648 SF $19.75 $72,048.00
06 8000 furnish and Install Exterior Acrylic Fanade-lncludes required Waterproofing-Offices 1,280 SF $19.75 $25,280.00 06 B000
Furnish and lnsteU Exterior Acrvlic Faf.lade-lncluda s required Waterprooffng-Med Congregate Beds 1 992 SF $19.75 $19,592.00
06 8000 Furnish and Install Exterior Acrylic Fanade-lncludes required Waterproofing-Triage/Medlcal Beds 1,856 SF $19.75 $36,656.00 06 8000 Furnish and Install Exterior Acrylic Fa! lade-Includes required Waterpraoflng-Kitchen/Oining 2,592 SF $19.75 $51,192.00 06 8000 Furrish and Install Exterior Acrytic Fal ede-lncludes required WateJl)looflng-Congregate Beds l 5.984 SF $19.75 $118,184.00 ()6 SO IN) Furnish and lnstan Exteticr Acrylic FarJada-lncludes re-quired Waterproofing-Congregate Beds 2 2.784 SF $19.75 $54,984.00 06 SIi 110
Furnish and Install Exterior Actylic Fanade-lndude!i required Waterproofing-Individual Sleeping Units 21,760 SF $19.75 $429,760.00
068000 Furnish and Install Exterior Acrylic FaUade-1ncfudes required Waterproofing-Dog Wash 1.728 SF $19.75 $34,128.00 1168000 Fumish and lnslaU Exte,ior Aayfic Fanad•lnctudn requiJed W81Mproofing.0og Keooet 1.721 SF $19.75 $34,128.00 06 so oo Furnish and Install Exte1io1 Acrylic Fan ade--lnclude-s required Waterprooflng-Storoge 1,728 SF $19.75 $34,128.00 l07 D0700 •Thermal and Moisture Ptotection $0.00
07 50 IKI
Furnish and Install TPO Roof Sygtem-lncludes Waterproofing, Drainage and Trim-Front Offices and Communal Spaces 4,5011 SF $18.00 $81,000.00
01 soon Furnish and Install TPO Roof Sygtem-lncludes Waterproofing, Drainage and Trim-FJe,c Space 2.240 SF $18.00 $40,320.00 U750UIJ
Furnish and Install TPO Roof Syslem-lndudes Walerproofing, Drainage and Trim-Loung e-, Storage and Hot Box 3,360 SF $18.00 $60,480.00
117 50 110 Furnish and Install TPO Roof System-Includes Waterproonng, Drainage and Trim-Offices 3,360 SF $18.00 $60,480.00 111511 no
Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim-Med Congregate Beds I 3,640 SF $18.00 $65,520.00
07 50 00
Furnish and Install TP0 Roof System-Includes Waterproofing, Drainage and Trim-Triage/ Medical Beds

3.36U $18.00 $60,480.00 SF
117 511 00 Furnish and Install TPO Roof System-Includes Waterproofing , Drainage and Trim-Kitchen/Dining 3.6411 SF $18.00 $65,520.00 07 50011
Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim-Congr egate Beds I 8,&211 SF $18.00 $158,760.00
111511 no
Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim-Cong regate Beds 2 2.8110 SF $18.00 $50,400.00
07 50 00
Furnish end Install TPO Roof System-Includes Waterproofing. Drainage and Trlm-lndNkfual Sleeping Unils

5.61!0 SF $18.00 $100,800.00
07 50 1HI Furnish and lnstan TPO Roof System-Includes Wa1erproofing, Drainage and Trim-Dog Wash 560 SF $18.00 $10,080.00 07 50 00 Furnish and Install TPO Roaf System-Includes Waterproofing, Drainage and Trim-Co g Kennel 560 SF $18.00 $10,080.00 07 50IHI Furnish and Install TPO Roof System-Includes Waterproofing, Drainage and Trim--Slorage 560 SF $18.00 $10,080.00 0791100
Fumiah and lnslall Floor. WaU and Ceiling Joint Sealant at Mate Une Locations-Front Offices and Communal Spaces 420 LF $26.00 $10,920.00
ll7911011 Furnish and Install Floor, Woll and Ceiling Joint Sealant at Mate Lina Lccations-Flex Space 280 LF $26.00 $7,280.00 11790110
Furnl$h and Install Floor, Wall and Celling Joint Sealant at Mate Une Locatfons~Lounge. Stor119e and Hat Box 500 LF $26.00 $13,000.00
07911 00 Furnish and Install Floor, Wall and Ceiling Joint Sealant at Mate Line Lc~ions-Offlces 4&0 LF $26.00 $12,480.00 07901!0
Furnlsh and lnstaU Floor, Wall and Ceiling Joint Sealant at Mats Line LccaUons.-Med Congregate Beds I 420 LF $26.00 $10,920.00
07901!0
Furnish and Install Floor, Wall and Celllng Joint Sealant at Mate Line Locations-Triage/Madical Beds 480 LF $Z6.00 $12,480.00
07901MI Furnish and Install Floor, Wall and Ceiling Joint Sealant at Mate Line Locations-Kitchen/Dining 420 LF $26.00 $10,920.00 07 90 00 Fumi&h and Install Floor, Wall and Ceiling Joinl Sealant al Mate Lina L0catlDJ1s-COn9regate Beds l 1.600 LF $26.00 $41,600.00 1179000 Furnish and Install Flo0f. Wall and Ceiling Joint Sealant at Mate Une Location$-Cong1egate Beds 2 320 LF $26.00 $8,320.00 Furnis;h and Install Floor, Wall and Ceiling Joint Sealant ■ t Mate Line Locations-Individual Sleeping Units $0.00 $0.00 079000 LF
0790{1(} Furnish and Install floor, Wall and Ce~ing Joilt Sealant al Mala Linc Locatlons--Oog Wash LF $0.00 $0.00 07 90 00 Furnish and Install Floor, wan and CeUlng Joint Sealant 111 Mate Line Locations-Dog Kennel LF $0.00 $0.00 0790{)(1 Furnish and tnstaK Floor, Wall and CeiOng ..Qnl Sealant at Mate Line Locations-Storage LF $0.00 $0.00 134 D0900 Fillishes $0.00
0980 00 Fumlsh ar,,d lnsta.11 f:.11enor Pllnt,-Pnmer alld2 Col'.lts--Fron1 Ofr.ces end Commu~ Spe.ae!ii 4,3&4 Sf $3.25 $14,248.00 09 90 00 Furnish and Install Exterior Paiht-Primer and 2 Coats-.flex Space 3,200 SF $3-25 $10,400.00 09 90 00 Furnish and Install Exterior Paint-Primer and 2 Coats-Lounge, Storage and Hot Bo• 3,6<8 SF $3.25 $11,856.00 09 90 00 Furnish and tnstatl Exterior Paint-Primer and 2 Coats-Offices 1.2eo SF $3.25 $4,160.00 09 90 00 Furnish and lnstaU Exterior Paint-Primer and 2 Coats-Med Congregate Beds 1 992 Sf $3.25 $3,224.00 09 9000 Furnish and Install Exterior Paint-Primer and 2 Coats-Trtageflv1edK:al Beds l ,8SB Sf $3.25 $6,032.00 09 90 00 Furnish and Install Exterior Paint-Primer end 2 Coats-Kitchen/Dining 2:592, SF $3.25 $8,424.00 09 90 00 Furnish and Install Exterior Paint-Primer and 2 Coats-Congregate Beds 1 5.9M SF $3.25 $19,448.00 09 90 00 Furnish and Install Extertor Palnt-PrimMand 2 Coats-congregate Beds 2 2.784 SF $3.25 $9,048.00 099000 Furnish and Install Exterior Paill-Ptimerond 2 Coa~ndividual Sleeping Units 21 .760 SF $3.25 $70,720.00 09 90 00 Furnish end Install Exterior Palnt..Prlmer and 2 Coats-Dog Wash 1,7<B SF $3.25 $5,616.00 099000 Furnish and hlste.11 Exterk>r Paint-Primer and 2 Coats-Dog Kennel ,.rn SF $3.25 $5,616.00 09 90 00 Furnish and Install Exterior Paint-Primer and 2 Coats-Storage 1,7211 Sf $3.25 $5,616.00 09 70 00 Furnish and Inst.di Re~ient Floortng-ARMSTRONG RAFFIA STREAM• WI DIO, 12"X24" STANDARD COLOR 2,400 SF $28.00 $67,200.00 TBD·Hallways
149 01300 ~pecfal ConstNctlon $0.00
1321 26.1 Furnfsh and Install Walk-In Cooler. Includes floor, ceiling and wall panels, equipment and finishes BO SF $650.00 $52,000.00 13 2126.2 Furnish and lnstall Walk-In Freezer. Includes floor, cetllng and wall panets, equipment and finishes 60 SF $650.00 $39,000.00 111 D2100 FI .. Prolection $0.00
211000
Connect Ftre Servk:e line to Modular B1.11ldings-lncludes all required fittings and up to 5 feet of pipe•2R 4 EA $3,500.00 $14,000.00
211000
Conned Fire Setvice Line lo Modular B1111dlngs-lncludes all required fittings and up to 5 feet of pipe-1" 13 EA $2,500.00 $32,500.00
211000 Connect Fire Sprinkler Pipes at Mate Lines-Includes all required fittings and up to 5 feet of plpe-Front Offices and EA $0.00 $0,00 Comrmmal Spaces 2110 00
Connect F,re Sprinkler Pipes at Mete Lines-Includes all required fittings and up to 5 feet of pipe-Fie, Space 4 EA $2,200.00 $8,800.00
211000 Connect Fire Sp1inkler Pipes al Mate Lines--fnrJudes all required fittilgs and up to 5 reet of pipe-Lounge, Storage 5 EA $2,200.00 $11,000.00 and Hot Box 211000
Connect Fire Sprinkler Pipes at Mate Lines-Includes an required fittings and up to 5 feet of pipe-Offices 3 EA $2,200.00 $6,600.00
211000
Connec;t Fire SprinkSer Pipes at Mate UleS-ln<:ludes atl required fittings and up to 5 feet of pipe-Med Congreg.ite 5 EA $2,200.00 $11,000.00 Beds 1
211000 Connect Fire Sprinkler Pipes at Mate Unes-lncludes all required fiWngs and up to 5 feet of pipe-Triage/Medic.al Beds 5 EA $2,200.00 $11,000.00 211000
Connect Fire Sprinkler Pipes at Mate Lines-Includes all required fittings and up to 5 feet of pipe-Kitchen/Dining 4 EA $2,200.00 $8,800.00
211000
Connect Fire Sprinkle, Pipes at Mate Lruts..incfudas all requhd ftttkigs and up to 5 feet of pipe-Congregate Beds 1 40 EA $2,200.00 $88,000.00
211000
Connect Fire Sprinkler Pipes at Mate Wnes-lncludes an required fittings and up to 5 feet of pipe-Congregale Beds 2 2 EA $2,200.00 $4,400.00
211000
Connect Fire Sprinkler Pipes at Mate Liles-Includes all required fitings and up to 5 feet of plpe-lndMdu.n Steeping Units 1( EA $2,200.00 $22,000.00
211000
Connect Fire Sprinkler Pipes at Mate Ules-lncludes all required fittings and up to 5 feet of pipe-Dog Wash EA $0.00 $0.00
211000
Connect Fire Sprinkler Pipes al Mate Liles-Includes all required fittings and up to 5 feet of pipe-Dog Kennel I EA $2,200.00 $2,200.00
211000
Connect Fire Sprinkler Pipes at Mate Lines-Includes aU required 6Wngs and up to S feet of pipe--Slorage EA $0.00 $0.00
16B 02200 ""Plumbing $0.00
221100
Connect Potable Water Service to Modular Bulklings-tncludes a.II required frttings and up to 5 feet of pipe-Front Offices and communal Spaces-1" 1 EA $3,000.00 $3,000.00 221100
Connect Potable Water Service to Moduar Buildings-Includes 8'1 required fittings and up to 5 feel of pipe.front Offices and Communal Spaces-Ls· 10 EA $2,500.00 $25,000.00 221100
Connoct Potable Water Service to Modular Buildings-Includes all required fittings end up to 5 feet of pipe-Front Office& and Communal Spaccs-2• 2 EA $2,200.00 $4,400.00 221100
Connect Potable Weter Service to Modular Bulklings-lncludes all required fittings and upto 5 feet of pipe-Front Ofices and Communal Spaces-3" 3 EA $2,400.00 $7,200.00
221100
Connect Potablo Water Servtce pipe at Mate6nes-tndudes aJI required fittings and up to 5 feet of pipe-Front Offices and Communal Spaces 3 EA $2,400.00 $7,200.00
221100
Connect Potable Water Setvice pipe etMatellnes-lncludes all required fittings and upto 5 feet of pipe-Flex Space 0 EA $0.00 $0.00
2211 00
Connect Potable Wa1er Service pipe at Matelines-lncludes all required fittings and up to 5 feet of pipe-Lounge, Storage and Hot Box 4 EA $2,200.00 $8,800.00
2211 00
Connect Potable Water Service pipe at Matelines -lncludes all required fittings and up to 5 feet of pipe-Offices EA $0.00 $0.00
2211 00
Connect Potable Water Service pipe at MataHnes-lnciudes ell required fittings and up to S feet of pipe--Med Congregate Beds; 1 EA $0.00 $0.00
221100
Connect Potable Water Service pipe at Matellnes-lncludes all required fittings and up to 5 reet of pipe- EA $0.00 $0.00 Triage/M'edical Beds
221100
Connect Potable Waler Service pipe at Matelines-lnciudes all required fittings and up to 5 feet of pipe- Krlchen/Dining 1 EA $2,200.00 $2,200.00
Connect Potable Water Service pipe at Matelines-lnciudes all required fittings and up to 5 feet of pipe-Congregate $0.00 $0.00 221100 Beds1 EA
Connect Potable Water Service pipe at MateDnes-lnclude s all required fittings and up to 5 feet or pipe-Congregate 221100 Beds2 2 EA $2,200.00 $4,400.00
221100
Connect Potable Water Service pipe at Matellne!.-l11cludes an required fittings and up to 5 reet or pipe•lndividual Sleeping Units EA $0.00 $0.00
221100
Connect Potable Water Service pipe at Matelines-lncludes all required fittings and up to 5 feet of pfpe-Dog Wash EA $0.00 $0.00
221100
Connect Potable Water Service pipe at Matellnes•lncludes all required fittings and up to 5 feet of pipe-Dog Kennel EA $0.00 $0,00
Connect Potable Weter Service to Modular Buildings-Includes all required fittings. and up to S feet of pipe.storage $0.00 $0.00 221100 EA
221300
Conneci Sewer lateral to Modular Buildings-Includes all required fittings and up to 5 feet of pipe-1.Sn 2 EA $2,500.00 $5,000.00
2213 00
Connect S8'Ner lateral to Modular Buildings-Includes. all required fittings and up to 5 feet of ptpe-4• 24 EA $2,000.00 $48,000.00
2213 OD
Connect Sewer Lateral Pipes at Matelines-lncludes an required rrtmgs and up to 5 feet of pipe-front Offices and Communal Spaces EA $0.00 $0.00
Connect Sewer Lateral Pipes at Malelines-lncludes all required fJttlngs and up to 5 feet of pipe-flex Space $0.00 $0.00 221300 EA
2213 00
Connect Sewer Lateral Pipes at Matelines-lncludes all required fittings and up to 5 feet of pipe-Lounge, Storage and Hot Box 4 EA $2,600.00 $10,400.00
Connect sewer Lateral Pipes at MateUnes-lncludes eU required fittings and up to 5 feet of pipe-Offices $0.00 $0.00 22 13 DO EA
2213 DO
Connect Sewer Lateral Pipes at Matellnes-lncJudes all required fitdngs and up to 5 feet of pipe-Med Congregate Beds 1 EA $0.00 $0.00
2213 OD
Cohnect Sewer Lateral Pipes at Matelines--lncludes all required fittings and up to 5 feet of pipe-Triageflv1edical Beds EA $0.00 $0.00
221300
Connect Sewer Lateral Pipes at Matelines-lndudos all required fittings and up to 5 feet of pipe-Kitchen/Dini ng 1 EA $2,500.00 $2,500.00
221300
Connect Sewer lateral Pipes at Matellnes-lnclud es all required fittings and up to 5 feet of pipe-Congregat e Beds 1 EA $0.00 $0.00
2213 OD
Connect Sewer Lateral Pipes at MateUnes.lncludes all required fittings and up lo 5 feet of pipe-Congregate Beds 2 EA $0.00 $0.00
2213 00
Connect Sewer Lateral Pipes et Matellnes-lncludes all required fittings and up to 5 feet of plpe-lndMdual Sleeping Units EA $0.00 $0.00
Connect Sewer Lateral Pipes at Matellnes-lncludes all required fittings and up to 5 feet of pipe-Dog Wash $0.00 $0.00 2213 00 EA
Connect Sewer late,al Pipes et Metelines-lncludes all required fittings and up to 5 feet of pipe-Oog Kennel $0.00 $0.00 2213 OD EA
2213 00
Connect Sewer Lateral Pipe-s at Matellnes-lncludes all required fittings and up to 5 feet of pipe-Storage EA $0.00 $0.00
2214 00
Furnish and Install 6"x4" Primary and Overflow Roof Drainage Scuppers-Front Offices and Communal Spaces 4 EA $850.00 $3,400.00
2214 DD Furnish and Install 6•x4" Primary and Overflow Roof Drainage Scuppers-Flex Spece 2 EA $850.00 $1,700.00 2214 00
furnish and Install 6"x4• Primary and Overflow Roof Oralnage Scuppers-Lounge, Storage and Hot Box 2 EA $850.00 $1,700.00
2214 00 Furnish and Install 6"x4• Prtmary and Overflow Roof Drainage Scuppers-Offices 2 EA $850.00 $1,700.00 2214 DO Furnish and Install 6"x4" Primary and overflow Roof Drainage Scuppers-Med Congregate Beds 1 2 EA $850.00 $1,700.00 221400 Furnish and Install 6"x4" Primary and Overflow Roof Drainage Scuppers-Triage/Med ical Beds 2 EA $850.00 $1,700.00 221400 Furnish and Install 8"x4" Primary and Overflow Roof Drainage Scuppers-Kitchen/Dining 2 EA $850.00 $1,700.00 2214 00 Furnish and Install 6"x4" Primary and Overflow Roof Drainage Scuppers-Congregate Beds 1 8 EA $850.00 $6,800.00 2214 00 Furnish end Install 6"x4n Primary and Overflow Roof Drainage Scuppers-Congregate Beds 2 2 EA $850,00 $1,700.00 2214 00 Furnish and Install 6"x4" Primary end Overflow Roof Drainage Scuppers-Individual Sleeping Units 10 EA $850.00 $8,500.00 2214 OD Furnish and lnstall 6"x4" Primary and OVerflow Roof Drainage Scuppers-Dog Wash 2 EA $850,00 $1 ,700.00 2214 DD Furnish and Install 8"x4• Primary and OVerflow Roof Drainage Scuppers-Dog Kennel 2 EA $850.00 $1,700.00 2214 DD Furnish and Install 8",c4" Primary and Overflow Roof Drainage Scuppers-Storage 2 EA $850.00 $1,700.00 2233 00 Furnish and Install Electric Domestic Water Heater 1 EA $9,500.00 $9,500.00 215 02300 HVAC EA $0.00
231100
Connect 2• Gas Service to Kitchen/Dining BuUding. Includes all required fittings and up to 5 feet of Jipe 1 EA $8,500.00 $8,500.00
23 3100
Connect 12X8 HVAC Duct at Matelines-lncludes required Insulation and up to 5 feet of ducf...f'ront Offices and 3 EA $250.00 $750.00 Communal Spaces
23 3100
Connect 10X8 HVAC Duct at Matelines•lnc:fudes required insulaion and upto S feet of duct-Front Offices and 3 EA $250.00 $750.00 Communal Spaces
23 3100
Coooect 6X8 HVAC Duct at Matellnes-lncludes required insulation and up to S feet of duel-Front Offices and 1 EA $250.00 $250.00 Communal Spaces
23 3100 Connect2• HVAC Ax Distrilulion Pipe atMatelines-hlcludes required insulation and up to S feet of pipe-Front 11 EA $250.00 $2,750.00 Offices and Communal Spaces
23 3100
Connect 12X8 H\/AC Duct at MateNnes-lncludes required insulation and up to 5 feet of duct-Flex Space EA $0.00 $0.00
23 3100
Connect 10X8 HVAC Duct at Male lines-Includes required insulation and up to 5 feet or duct-Flex Space EA $0.00 $0.00
23 3100
Connect 2" HVAC AA Distribution Pipe at Matelines-lncludes required insulation and up to S feel of pipe-Flex Space 18 EA $500.00 $9,000.00
23 3100
Connect 12X8 HVAC Duct at Matcllnes-b:ludes required insulation and up to S feet of duct-Lounge, Storage and 7 EA $250.00 $1,750 .00 Hot Box Area
23 3100
Connect 10X8 HVAC Duct at Matellnes-t\cludes required Insulation and up to 5 feel of dud-Louge, storage and EA $0.00 $0.00 Hot Box Area
23 3100
Connect 2" HVAC Air Distribution Pipe atMatelines-lncludes required Insulation and up to 5 feet of pipe-lounge, 3 EA $250.00 $750.00 Storage and Hol Box Afea
23 3100 Connect 12X8 HVAC Duct al Matelines-lncludes required insulation and up to S feet of duct-Offices EA $0.00 $0.00
23 3100
Connect 10XB HVAC Duct at Matelines-lncludes required insulation and upto 5 feet of duct-Offices 6 EA $250.00 $1,500.00
23 3100
Connect2• HVAC Air Dlstnbution Pipe atMatelines-lncludes required insulation and up to S feet of pips-Offices 3 EA $500.00 $1,500.00
23 3100
Connect 12X14 HVAC Duct at Mate!ines-lndudes required Insulation and up to 5 feet of duct-Med Congregate Beds 2 EA $250.00 $500.00 1
23 3100 Connect 12X8 HVAC Duct at Matelines--lncludes required insulation and up to S feet of duct-Med Congregate Beds 1 EA $250.00 $250.00 1
23 3100
Connoct 10X8 HVAC Duct at Matelines-.lncludes required Insulation and up lo S feet of duct-Med Congregate Beds 2 EA $250.00 $500.00 1
23 3100 Conned Z' HVAC Air Distribution Pipe al Ma1elines-lncludes required insulation and up to S reet of pipe-Med 2 EA $250.00 $500.00 Congregate Beds 1
23 3100 Connec112X8 HVAC Duct at Matelines-lncludes required insulation and up to 5 feel of duct-Triage/Medical Beds 1 EA $250.00 $250.00
23 3100 Connect 1 OX8 HVAC Duct at Mate1ines--tncludes required Insulation and up lo 5 feet of duct-Triage/Medical Beds 3 EA $250.00 $750.00
23 3100
Connect 2~ HVAC Air Distribution Pipe alMatelines-lncludes reqWred Insulation and up to 5 feet of pipe- Triage/Medical Beds 25 EA $500.00 $12,500.00
23 3100 Connect 12X.8 HVAC Duct at Mateltles-lncludes required insulation and up to s feet of duct-Kitchen/Dining 1 EA $250.00 $250.00
23 3100
Connect 10XB 1-NAC Duct at Matelines-lnctudes required Insulation and up to S feet of duct-l<Hchen/Olnlng EA $0.00 $0.00
23 3100 Connect 'Z' HVAC Air Dlstrilution Pipe atMeteltnes-lncludes required Insulation and up to 5 feet of pipe- 14 EA $250.00 $3,500.00 Kitchen/Dining 23 3100
Connect 12X8 HVAC Duct at Matelines-lncludes required insulation and up to S feel of duct-Congregate Beds 1 2 EA $250.00 $500.00
23 3100
Connect 10X8 HVAC Duct at Matel!nes-lncludes required insul:ation and up to S feet of duel-Congregate Beds 1 23 EA $250.00 $5,750.00
23 3100
Connect 2• HVAC Air Distribution Pipe al Matellnes-lncludes required insulation end up to 5 feet of pipe-Congregate 29 EA $250.00 $7,250.00 Beds 1
23 3100 Connect 12X8 HVAC Duct at Matelines-hcludes required insulation and up 1o S feet of duct-Congregate Beds 2 1 EA $250.00 $250.00
23 3100
Connect 1 0XB HVAC Duct at Matelines-tncludes required insulation and up to 5 feet of duct-Congregate Beds 2 3 EA $250.00 $750.00
23 3100
Connect 2" HVAC PJr Oistribl.ltion Pipe atMateUnes-locludes required insulation and up to 5 feet of pi'pe-Con5'egate 8 EA $500.00 $4,000.00 Beds2
23 3613 Furnish and Install Commerclal Kitchen Hood-Fast Kitchen•• Model SSH-DPSP or Approved Equivalent 1 EA $24,850.00 $24,850.00
23 74 00
Furnish end Install Johnson Controts• HVAC Rooftop Units-Model KQG06E2C!AASA111AI or Approved Equivalent 2 EA $16,000.00 $32,000.00
246 D2600 "EJe:ctrlcal $0.00
2610 00 Connect Electrical transmission Line to Modular Buildings 13 EA $2,400.00 $31,200.00 261000
Conned Electrlcol lincs at Matelines-Jncludes up to 20 feet of cable-Front Offices and Communal Spaces 1 EA $1,600.00 $1,600.00
2610 00 Connect Electrical lines at Matei nes--lncludes up to 20 feel of cable-Flex Space 1 EA $1,600.00 $1,600.00 2610 DO Connect Electrical lines at Matallnos-Jndudes up to 20 feet of cable-Lounge, Storage and Hot Box 1 EA $1,600.00 $1,600 .00 2610 00 Connect Electrical Unes at Male1ln0s-lndudes up to 20 feet of cable-Offices 1 EA $1,600.00 $1,600.00 281000 Connect BectriaM lines at Matelines~lndudes up to 20 feet of cabl~ed Congregate Beds 1 1 EA $1,600.00 $1,600.00 28 1000 Connect Electrical lines et Matelincs-lncludes up to 20 feet of cable--TriageJMedical Beds 1 EA $1,600.00 $1,600.00 261000 Connect Electrical lines at Matelinea-lncludes up lo 20 feet of cable-Kitchen/Dining 1 EA $1,600.00 $1,600.00 2610 00 Connect Bectrical tines at Matelines-lncludes up to 20 feet of cable-Congregate Beds 1 1 EA $1,600.00 $1,600.00 261000 Connect Electrical lin&S at Matellnes-klctudes up to 20 feet of cable-Congregate Beds 2 1 EA $1,600.00 $1,600.00 2610 00 Connect Electrical lines at Matelines-lncludes upto 20 feet of cable-Individual Sleeping Units 1 EA $1 ,600.00 $1,600.00 2610 00 Connecl Electrical llnes al Matellnes-lnciudes up lo 20 feet of cable-Dog Wash 1 EA $1,600.00 $1,600.00 261000 Connect Ele<;trical lines al Malellnes-tncludes up to 20 feet of cable-Dog Kennel 1 EA $1,600.00 $1,600.00 2610 00 Connect Electrical lines at Mate~nes-lncludes up to 20 feet of cable--Storege 1 EA $1,600.00 $1,600.00 26 20 00 Connect Low Voltage Transmission Line to Modular Buildings 13 EA $2,400.00 $31,200.00 26 20 00
Connect Low Voltaae Transmission lfnes at Matelines-ll"ICludes up to 20 feel of cable-Front Offices and Commune I Spaces 1 EA $1 ,600.00 $1,600.00
26 20 00 Connect Low Volt.age Transmission lines at Matellnes-lncludes upto 20 feot of cable-Flex Space 1 EA $1,600.00 $1,600.00 26 20 00
Connect Low Voltage Transmission /Ines at Matellnes-lncludes up to 20 feet of cable-lounge, Storage and Hot Sox 1 EA $1,600.00 $1,600.00
262000 Connect Low Vottsge Transmission Jines el Mate6nes.-lnciudes up to 20 feet of cable-Offices 1 EA $1,600 .00 $1,600.00 2620 00
Connect Low Voltage Transmission lines at Matellnes..Jncludes up to 20 feet of cable-Med Congregate Beds 1 1 EA $1,600.00 $1,600.00
2620 00
Connect Low Voltage Transmission lines at Matelines-lncludes up to 20 feet of cable-Triage/Medical Beds 1 EA $1 ,600.00 $1 ,600.00
2620 00
Connect Low Voltage Transmission lines at Matetines-lncludes up to 20 feet of cable-Kitche~n lng 1 EA $1,600 .00 $1,600.00
26 20 00
Connect Low Voltage Transmission !Ines at Matelines-lncludes up to 20 feet of cabte-Congregote Beds 1 1 EA $1,600.00 $1,600.00
262000
Connect Low Voltage Transmis,sion lines at Matelines-Jncludes up to 20 feet of cable-Congregate Beds 2 1 EA $1 ,600.00 $1,600.00
26 20 00
Connect Low Voltage Transmission lines at Matelines-lncludes up to 20 feet of cable-lndMdual Sleeping Units 1 EA $1,600.00 $1,600.00
2620 00 Connect Low Voltage Transmission !Ines at Matelines-lndudes upto .20 feet of cable-Dog Wash 1 EA $1,600.00 $1,600.00 262000 Connect Low Voltage Transmission lines at Matelines-lncludcs up to 20 feet of cable-Dog Kennel 1 EA $1 ,600.00 $1,600.00 2620 00 Connect Low Voltage Transmi&Sion lines at Matelines-lncludes up to 20 feet of cable-Storege 1 EA $1,600.00 $1 ,600.00 26 30 00
Furnish and Install a 125 KW Generator-Johnson Power Systems• or Approved Equivalent. Includes Fuel Tank, 1 EA $1 ,600.00 $1 ,600.00 Piping and Acce&Sories
26 40 00 Furnish and Install Lightning Protection System 13 EA. $2,800.00 $36,400.00 2?9 D2700 •eommunfc:atlons $0.00
2710 00 Connect Communication Line to Modular Buildings 13 EA $2,500.00 $32,500.00 2710 00 Connect Communication lines at Mataines-lncludes up to 20 feet of cable-Front Offices and Communal Spaces 1 EA $1,600.00 $1,600.00
271000 Connect Comm1.1nlcatlon lines at Matellnes-/ncludes up to 20 feet of cable-Flex Space 1 EA $1,600.00 $1,600.00 2710 00
Connect Communication lines at Matelincs-lncludes up to 20 feet of cable-Lounge. Storage and Hot Box 1 EA $1 ,600.00 $1 ,600.00
271000 Connect Communication lines at Matelines-lncludes up to 20 feet of cable,.Offices 1 EA $1,600.00 $1,600.00 271000
Connect Communication lines at Matellnes-lncludes up lo 20 feet of cable-Med Congregate Beds 1 1 EA $1 ,600.00 $1 ,600.00
271000 Connect Communication llnBS at Matel nes-lnctudes upto 20 feet of cable-. Triage/Medical Beds 1 EA $1,600.00 $1,600.00 2710 00 Connect Communication lines at Matollnes-lncludes up to 20 feet of cable-Kitchen/Dining 1 EA $1,600.00 $1,600.00 271000 Connect Communication lines at Matellnes-lncludes up to 20 feet of cable•Congregate Beds 1 1 EA $1 ,600.00 $1 ,600.00 2710 00 Connect Communication lines at Matellnes-lncludes up to 20 feet of cable-Congregate Beds 2 1 EA $1,600.00 $1,600.00 2710 00
Connect Communication llnes at Mate lines-Includes up to 20 feet of cable-Individual Sleeping Units 1 EA $1,600.00 $1,600.00
271000 Connect Communication fines at Mateflnes-lncludes up to 20 feet of ceble,.Oog Wash 1 EA $1 ,600.00 $1 ,600.00 2710 00 Connect Communication lines at Matelines•lncludes up to 20 feet of cable-Dog Kennel 1 EA $1,600.00 $1 ,600.00 27 10 00 Connect Communlcatton lines at Matclines-lncfudes up to 20 feet of cable-Storage 1 EA $1,600.00 $1 ,600.00 27 2000 Data Communications 1 LS $15,000 .00 $15,000.00 27 30 00 Voice Communications 1 LS $15,000.00 $15,000.00 27 40 00 Aucfio--Video Communications 1 LS $15,000 .00 $15,000.00 27 50 00 Distributed Communications end Monitoring Systems 1 LS $15,000 .00 $15,000.00 298 D2800 •Elec:tronlc Safety and Security $0.00
26 08 00 Commissioning of Electronic Safety 8fld Security 1 LS $15,000.00 $15,000.00 26 10 00 Access Control 1 LS $985,000.00 $985,000.00
28 20 00 Video Survelllance 1 LS $445,000 .00 $445,000.00 283000 Security Detection, Alarm, and Monitoring 1 LS $15,000 .00 $15,000.00 28 40 00 Ute Safety 1 LS $25,000.00 $25,000.00
28 50 00 Specialized Systems 1 LS $2,500.00 $2,500.00
305 D3100 Excavation $0.00
312300
Excavation for Foundation-Includes Excavation for Crawl Space-Front Offices and Communal Space 458 CY $255.00 $116,790.00
312300 Excavatk:in for Foundalion-lnciudes Excavation fDf Crawl Space-Flex Space 235 CY $255.00 $59,925.00 312300 Excavation for Foundation-klcludes Excavation for Crawl Space-Lounge, Storage and Hot Box 3-44 CY $255.00 $87,720.00 312300 Excavation for Foundation-Includes Excavalon tor Crawl Space-Off,ces 338 CY $255.00 $86,190.00 312300 ExcavaUon for Foundation--lncludes Ercavation for Crawt Space-Med Congregate Beds 1 386 CY $255.00 $93,330.00 312300 Excavation for Foundation-Includes Excavation for Crawl Space-TriageJMedical Beds 337 CY $255.00 $85,935.00 312300 Excavation for Foundalion-tnctudes Excavaion for Crawl Space-Kitchen/Dining 365 CY $255.00 $93,075.00 312300 Excavaion for Foundation-Includes Excavation for Crawt Space•Congregate Beds 1 285 CY $255.00 $72,675.00 312300 ExcavaUon for Foundation-Includes Excavation for Crawt Space-Congregate Beds 2 288 CY $255.00 $73,440.00 312300 Excavation for Foundation-Individual Sleeping Units 227 CY $255.00 $57,885.00 312300 Excavation for Foundation-Dog Wash 13 CY $255.00 $3,315.00 312300 Excavation for Foundation-Dog KeMel 13 CY $255.00 $3,315.00 312300 Excavation for Foundation-storage 13 CY $255.00 $3,315.00 150 List Any Item Here that is Not Listed Above I LS $812,273.00 $812,273.00 $0.00
Total Base Bi<H3Ullding $9,637,000.00
* Design lnfonnation regarding this item maynotyel be available at this time, end the General Contractor Is encouraged to use reasonable assumpions regarding this scope of work in preparing their bids until sufficient details become evakab(e on the design pans. Should design infonnaUon become avai!abJe subsequent to award of the Contract, the City of San Bernardino wiU negotiate the actual price of the work for which design plans or specifications are missing with the lowest responsive bidder.

IMO SCHEULE

SITE WORKS ANO INFRASTRUCTURE
PROJECT fiAJ'1 E· llomt>less ria>laanon Center Ca111n.n PROJECT rio • G824-010
J O('ATIOl'i 796 6Ih St, San Rcmarclino C·\ 92410
BID Oflf.NING DATE Janual}' 13 2026

BASE SID SCOPE
No DESCRIPTION (REFERTO PLANS & SPECIFICATIONS FOR FURTHER INFORMATION) Qty Unit! I
#1 - General Conditions
I.I
Mobi1ization, Insurance, Demobilization I LS 45000
12 Clearing and Grubbing, Tree Removal and Other Items for Demolition Unclassified Excavation and I LS 25000 Unctassffied Fil per project plans and specs.

1.3 Project Construction Sign I EA 4500

1.4 Furnish, install, and maintain all traffJC control, detour sign. sq>ing, fencirs and safety meaStXes to perform I LS l0000 work, including traffic control and/or construction phasing plan.

1.5 Construction Safety, Daily Cleanup, & Construction Best Management Practices (SWPPP, Erosion & Dust I LS 25000 Control etc.)

1.6 Construction Staking, SuNey, Unes & Grade I LS 50000 #2-
Remove Existing Asphalt Pavement Section (Defih= r) 320 SF 4 2.1
Grind & Overlay Asphalt Pavement (Depth• 0.15') 5,765 SF 3 2.2
Relocate Power Pole Guy Anchor 1 2.3 EA 3500

2.4 Remove Existing Concrete Sidewalk 2,800 SF
4 Remove Emling Concrete (Reinrorced) 8.500 SF

3.75 2.5

2.6 Remove Eliisting Asphalt Pavement and Base 38.600 Sf 1.55

2.7 Remove Existing EarthlTurf in Preparation for Site Improvements 57.100 SF

0.75 Remove Existing Concrete Driveway Approach 990 SF
4 2.8

2.9 Remove Existing Concrete Pads, Including Utilities 23,600 SF

2.75 Remove Existing S" Concrete Curb & Gutter 110 LF
6 2.10

2.11 Remove faisting 6" Concrete Curb 530 LF
6 2.12 Remove Existmg Tree 33 EA 850

2.13 Remove Existing Mailbox 1 EA 75

2.14 Remove Exlsting Chain Link Fence 450 Lf 6
Remove Existing Tubular Fence 1,600 LF
8 2.15

2.16 Remove Existing Metal Post 3 EA 75
Contractor's Bid
Unit Prit:e Amount
$25,000 .00
$15,000.00
$4,500.00
$10,000.00
$25,000.00
$30,000.00
$1,280.00
$17,295.00
$3,500.00
$11,200.00
$31,875.00
$59,830.00
$42,825.00
$3,960.00
$64,900 .00
$660.00
$3,180.00
$28,050 .00
$75.00
$2,700.00
$12,800.00
$225.00

2.17 Remove Existing Sign 2 EA 75 $150.00

2.18 Construct 3'" Asphalt Concrete over 4" Aggregate Base 3,980 SF

4.75 $18,905.00

2.19 Construct 3" Asphalt Concrete over 6" Aggregate Base 19,600 SF

5.75 $112,700.00

2.20 Construct e· PCC Concrete over-I" Aggregate 8'Jse 14,000 SF 18 $252,000.00

2.21 Construct 6" PCC Concrete over 4• Aggregate Base Commercial Driveway 2,200 Sf 16 $35,200.00

2.22 Furnish & Install Trash Enclosure 1 EA 25000 $25,000.00 223
Construct 4· PCC Sidewalk 21,700 SF

12.5 $271,250.00

2.24 Construct Type "A'" Concrete Curb 2,030 LF
30 $60,900.00
225 Construct Type "C'" Concrete Curb 1,200 LF
55 $66,000.00
226 Construct 4" Rolled Concrete Curb 25 LF
55 $1,375.00
227 Furnish & Install Cast-In-Place Detectable Warning Surface, Color Yellow 75 SF 70 $5,250.00

2.28 Construct Accessible Concrete Ramp 550 SF
25 $13,750.00

2.29 Paint 4" Wide While stripe 240 LF
7 $1 ,680.00

2.30 Paint Accessible Striping and Markings 610 Lf
IS $9,150.00

2.31 Furnish and Install 4" Round NOS Brass Grate 8 EA 975 $7,800 .00

2.32 Furnish and Install a· Atrium Grate 36 EA
650 $23,400.00

2.33 Furnish & Install 12''x12'" Square NOS Catch Basin or Approved Equal 7 EA 3000 $21,000.00

2.34 Furnish & Install 24"x24" Square NOS Cetch Basin or Approved Equal 4 EA 6000 $24,000.00

2.35 Furnish & Install 36"x36" Square NOS Catch Basin or Approved Equal 1 EA 12000 $12,000.00

2.36 Furnish & Install Grease Interceptor 1 EA 50000 $50,000.00

2.37 Furnish & tnstall 8" Sewer Cleanout 16 EA 2000 $32,000.00

2.38 Furnish & lnstall 6" PVC SCH 40 Pipe with Trenching and Backfill 680 LF 90 $61,200.00

2.39 Furnish & Install 4" PVC SOR 35 Pipe with Trenching and Backfill 300 Lf 78 $23,400.00

2.40 furnlah & Install B" PVC SOR 35 Pipe with Trencl!ing end Backfin BOO LF 80 $64,000.00

2.41 Furnish & Install 10" PVC SOR :35 Pipe with Trenching and Backfill 340 LF 95 $32,300.00

2.42 Furnish & Install 12" PVC SOR 35 Pipe with Trenching and Backfill 260 LF 150 $39,000.00 Furnish & Install 16" PVC SOR 35 Pipo with Trencltlng and BackfiU 290 LF 135 $39,150.00 2.43

2.44 Furnish & Install 2◄ " PVC SOR 35 Pipe with Trenching and Backfill 140 Lf 350 $49,000.00

2.45 Furnish & Install 6" DIP Fire Water, A.W.W.A C151 Class 350with Trenching and Backfill 1,630 LF 105 $171 ,150.00

2.48 Furnish & Install 2" CPVC Pipe with Trenching and Backfill 200 LF 170 $34,000.00

2.47 Furnish & Install 2~ PVC SCH 40 Pipe with Trenching and Backfill 920 Lf 50 $46,000.00
2,48 Furnish & Install 24"X24" Flogard Catch Basin with Filter Model FGP-24F 2 EA 9000 $18,000.00

2.49 Furnish & Install Stormtrap Undorground Vault 1 EA 465000 $465,000.00

2.50 Furnish & Install StormTrap StormSettler 2 EA 45000 $90,000.00

2.51 Furnish & Ins1a11 Et Double Check Detector Valve Assembly 1 EA 26000 $26,000.00 lnslall 8" Fire Hydrant 4 EA 12000 $48,000.00 2.52

2.53 Furnish & Install 1-1/2" Irrigation Water Meter 1 EA 26000 $26,000.00

2.54 Furnish & lnstall 2" Domestic Water Meter 1 EA 26000 $26,000.00

2.55 Furnish & Install Reduced Pressure Backflow Prevention Assembly 2 EA 4500 $9,000.00

2.58 Earthwork/Grading: Perform Grade Cut 4,000 CY
20 $80,000.00

2.57 Earthwork/Grading: Perform Gracie FOi 4,000 CY
20 $80,000,00

2.58 Paint 4~ Wide Green Stripe BO Lf JO $800.00

2.59 Install AfJA Perking Sign 1 EA 250 $250.00

2.80 Install EV Chorglng Parking Sign 4 EA 350 $1,400.00 1 Install Unauthorized Vehicle R112 (CA) Sign 1 EA
300 $300.00 2.6

2.6 2 Construct 12" dla. X 6' Deep Infiltration Device 24 EA 1000 $24,000.00 #3-
Lan
3,1 Furnish & Install Natural Turf Sod 1.284 I sf l2.28 1$2,927.52

3.2 Install IS Box Trees 23 EA 151 $3,473.00

3.3 lns1all24 Box Trees 41 EA
383 $15,703.00

3.4 Install Root Barrier 64 RA
61 $3,904.00

3.5 Install Landscape (Shrubs and Mulch) 24,007 SF

2.14 $51,374.98

3.8 Soit Preparation and Fine Gracing 24,007 SF

0.54 $12,963.78

3.7 lnstaR Irrigation System 24,007 LS 8.28 $198,777.96

3.8 Fumtsh & Install Irrigation Controller and Electrlcal Power Connection 1 EA 6000 $6,000.00

3.9 Furnish & Install Artiflclal Turf 1,537 SF 20 $30,740.00

3.10 Furnish & lnstal Decomposed Granite 955 SF
6 $5,730.00

3.11 Furnish & Install Mow Curb 28 LF 100 $2,800.00

3.12 Furnish & Install Concrete Edge Restraint 24 LF 30 $720.00

3.13 Furlish & Install Seal Wall 17 LF
250 $4,250.00

3.14 Furnish & Install Shade Salls 1 EA
95000 $95,000.00

3.15 Furnish & Install Bench 10 EA
2000 $20,000.00

3.16 Furnish & Install P-tenlc Tab&& 4 BA 3400 $13,600.00

3.17 Furnish & Install ADA Picnic Ta~e 2 EA 3900 $7,800.00 Furnish & Install Trash Receptacles 4 BA 2000 $8,000.00 3.18

3.19 Funish & Install Bicycle Rack 3 BA 1500 $4,500.00
320 Furnish & Install Pet Waste Station 1 BA 1300 $1,300.00 321 Furnish & Install Dog Run Course 1 BA 47000 $47,000.00

3.22 3.5' Seating Boulders 5 BA 350 $1,750.00
323 4-5' seating Boulders 6 EA 650 $3,900.00
324 90 Day Maintenance Period 24,007 SF

0.2 $4,801.40
#4-
Elec
Furnish and install Primal)' Utility Condul and Pole Riser including one (115-lnch conduit Including trenching, backfill, compaction, 145 $7,975.00 and surface restoration, in compliance with SCE requiements, project plans, specifications, and the Contract Documents. Work shal include all incidentals necessary for a complete 55 LF lnstaltation

4.1 Furnish and Install secondary utility eight (8) 5-lnch conduits including trenching, backfill, compaction, and surface restoration, in 235 $56,400.00 compliance vi.th SCE requirements. plans, and specfficalions. All wDfk. shall be complete in place per the Contract Documents 240 LF
42 Furnish and instaU 2-inch conduit v..th (3) 112 conductors and (1) 114 grounding conductor, complete In place, including 95 $19,950.00 trenching, backfil, compaction, and surface restoratiOn, tn accordance with the plans, and project specifications. 210 LF

4.3 Furnish and install 4-lnch conduit with (3) 4/0 conduclors and (1) G 210 as shown on the plans, com~ete In place, including 118 $153,990.00 trenching, backfill, compactfon, and surface restoration, in accordance With the Contract Documents 1305 LF

4.4 Furnish and Install ten (10) 2-inch PVC underground conduit runs as shown on the plans conductors consisting of (4) No. 2 AWG 96 $23,520.00 and (1) No. 8 AWG grounding conductor, including conduit stub-ups per Detail "An on Sheet E-2.0, and including all trenching, boctfill, compaclion, surface restoration, tenninations. testing, and incidenlals required for a complete and operational Installation In accordance with the plens, and project specifications. 245 LF

4.5 Furnish and Install four (4) 60-.Amp leYel 2 EV chargers YMh four (4) 1-ilch condlits, including 114 conductors, complete in 48000 $48,000.00 place. Work shall Include aU materials, connectlons, testing, coordination, and Incidentals necessary fore fully operational system, in accordance with the Contract Documents. 1 LS

4.8 Furnish and Install all matertals, {11) 3" PVC conduit run with 118 ground and CAT 5 cable, (1)2" Conduttwith 118 ground, 60000 $60,000.00 treflchilg, connections, backfdl and sulface restoration, and associated work as shown on Sheet E 11 (Communication Plan), complete fn place, In accordance with the plans, andprojectspecfflcations. 1 LS

4.7 Furnish and install one (1) 400-amp panel with the specified AIC rating, complete in pJace, In accordance 'Mth the plans, and 13000 $13,000.00 project specifications. 1 EA

4.8 11500 $57,500.00
Furnish and install new 225-amp panel rated at-42 kAIC, complete in place, per the Contract Documents. 5 EA

4.9 Furnish and install new 100-amp panel with the specified AIC rating, complete in place , In accordance with the plans, and project specifications. 9500 $123,500.00
13 EA

4.10 Furnish and Install one (1) 2,000-amp switchgear assembly rated at 82 kAIC, complete in place, Including all associated 90000 $90,000.00 connections , testing. wiring and coordination required for a fully funcUonet system. per the Contract Documents . 1 EA

4.11 Furnish and Install generator as shown on the approved plans and specifications, complete in place, including au accessorie s, 67000 $67,000.00 connections, testing, and comm~ioning required for operational acceptance, in accordance with the Contract Documents. 1 LS

4.12 Furnish and Install Automatic Transfer Switches complete In place, in accordance with the plan end project specifications 22000 $44,000.00 2 EA

4.13 Furnish and Install new 1 so.amp panel with the specified AIC rating, complete in place, In accordance with the plans, and proj~t specifications. 12000 $24,000.00
2 EA

4.14 4.15 Furnish and Install Parking Lot Lighting, Including conduit and ,-iring . 1 LS 65000 $65,000.00

4.16 Furnish and Install Street Lighting, including conduit and wiring. 30 EA 7500 $225,000.00 Furnish & Install New Utility Transformer Concrete Pad 2 EA 16000 $32,000.00 4.17

4.18 Furmlh and Install Utility Pull Box 1 EA 16000 $16,000.00 Install Combined Utility Trench 400 L.F 44 $17,600.00 4.19 Furnish and Install complete and fully operational Avigilon Security Camera (CC1V) System, consisting of eighteen (18) cameras 250 $14,500.00 58 EA

4.20 4.21 Furnish and Install complete operating Avlgllon Access Control Badge Readers. 6B EA 350 $23,800.00 #5•

5.1 tnstaU lS'xlS' Accessible Concrete Pad w/ Ramp & Hand/Guard Raits 225 SF 45 $10,125.00
Demolish (El Fence Including Footings 1579 LF
14 $22,106.00 5.2

5.3 Furnish & Ins.tall New 4' High Wire Mesh Fencing w/ (1) Pedestrian Gates Complete wt Footings 132 LF 166 $21 ,912.00

5.4 furnish & Install New 8' High Wire Screen Fencing w/ (4) Pedesbian Gates Complete w/ Footings 609 LF 269 $163,821.00

5.5 Furnish & Install New (1) 16' Wide Vehicular Gate Complete w/ Footings 1 EA 12000 $12,000.00 Furnish & Install New (1) 22' Wide Vehicular Gate Complete w/ Footings 1 EA 15000 $15,000.00 5.6

5.7 Furnish & Install New S High Block Wall 1,695 LF
150 $254,250.00
#6-
Co
Furnish and Install all material s, (11) I" conduit run with #8 ground, (1)2. Condultwfth #S ground, trenching, connections, backfill 180000 $180,000.00 and surface restoraUan. and associated work as shown on Sheet E-11 (Communication Plan) , complete in ptace, ln accordance with the plans. and project specifications. 1 LS

6.1 Furnish and install Avigilon Access Control (Badge Reader) System card/badge readers at all doors, exit points, and security 15000 $15,000.00 gates as indicated on the plans. The Contractor shall review the plans and door schedules to verify the number of modules and the locatioll$ of badge readers at each buiking door e)dl and security gate. The Contractor shaa furn.Sh all labor, materials , equipment. supeJVislon, coordination, testing, and commissioning necessary to provfde a complete and fully operational Avigilon Access Control (Badge Reader) System, In accordance with the Contract Documents end City of San Bernardino requirements. 1 LS

6.2 Furnish and Install dedicated conduit pathways from each badge reader locaHon to the Intermediate Distribution Frame (IDF) 50000 $50,000.00 located within the office areas. The Contractor shall furnish all labor, materials, equipment, supervision, coordination, testing. and commissioning necessary to provide a complete In place in accordance with the Contract Documents and City of San Bernardino requirements . 1 LS

6.3 Furnish and Install Category 6 (Cat 6) cabRng, lncludlng terminations, labeling, and testing, from badge readers to the IDF 15000 $15,000.00 necessary to provide a complete In place system in accordance with the Contract Documents end City of San Bernardino requirements. 1 LS

6.4 Furnish and install access control panels, power supplles, enclosures, and batteiy backup systems necessary lo provide a LS complete in piece $)'Stem In accordance with the Contract Documents and City of San Bernardino requirements. 12000 $12,000.00
1 6.5
Furnish and instaU etectric !ocioog hardware, including electric strikes or magnetic locks, door position switches, and request-to- 2220.36 $2,220.36 extt devices, as required necessary lo provide a complete in place system in accordance with the Contract Documents and City of San Bernardino requirements. 1 LS

6.6 Programming end configuration of access levels , schedu~s. and credentials as directed by the Cly 1 LS 2500 $2,500.00

6.7 I
!Testing of all system components. including noml31 and fail-safe operations I
1 I Ls !1soo 6.6

6.9 I 'Preparation and submission of as-built drawings and complete system documentation I
1 I Ls 11soo
#7-
CCT

7.1 I
Provide AH Other Work Not Listed Above But Required by Plans & Specifications I
1 I LS I
#8-

8.1 I
I Provide All other Work Not Usted Above But Required by Plans & Speciftc:ations I
1 I LS I
TOTAL BASE BID. sin: WORKS AND INl%\STRuc-ruR~ : I
Building
site
,.
$9,637,000.00
$5,400,000.00
$15,037,000.00
1$1 ,500.00
J $1,500,00
1$0.00
J$0 .00
I s5,4oo,ooo.oo
.,