Cities Index.
Attachment 1 - Proposal for Electrical Design Services

Mayor and City Council
February 4, 2026

Document
Attachment 1 - Proposal for Electrical Design Services
Meeting
February 4, 2026
Body
Mayor and City Council
Pages
2
Original file
251 KB
Text extracted from the city's file for reading and search. Open the original on sanbernardino.primegov.com. That file is the official record.

Contract Addendum

Addendum No. 1
Job No. 20192-E
November 3, 2025

Mr. Ramon “Eddie” Mendez
Public Works Engineering Division
City of San Bernardino
210 N. E Street, 2nd Floor
(909) 998-2440
Sent via email: [email protected]

Client has requested to add the electrical engineering consultant under our contract.

This additional scope was not anticipated in the original contract.

By signing below as indicated, Rick Engineering Company (“Consultant”) is authorized to expend an additional $44,000, bringing the total amount authorized as of this date to $244,000 to perform work in conjunction with our contract, dated September 4, 2025. The additional scope and fees are described below.

Additional Scope of Work:

1. Electrical Design Services –
RICK’s consultant, Z&K Consultants, Inc. will provide electrical design services for the SB Hope Navigation Center located at 796 E. 6th Street in San Bernardino. The following scope of work reflects the anticipated design tasks and coordination efforts required to support the project.

Services will include the following key tasks:
a. Electrical Design Plans
b. Site Visit and Data Collection
c. Load Calculations and Service Equipment Design
d. Power Distribution and Wiring Diagrams
e. Equipment and Installation Guidelines
f. Coordination with Southern California Edison (SCE) and Project Team
$44,000
Docusign Envelope ID: C39E4CCE-3CCA-4874-AD6D-03E32F4C0592 Mr. Ramon “Eddie” Mendez
20192-E Addendum No. 1
November 3, 2025

Page 2 of 2 ends

\\cp.rickeng.com\projects\C20000\20192_SanBernardino_EngOn-call\20192-E_Navigation Ctr_TO#004\Admin\Contracts\Proposals\2025_1103_20192-E_Contract_Addendum_01.docx Z&K will prepare complete design drawings and supporting documentation suitable for permitting and construction coordination.

Fee includes a markup for RICK coordination with the subconsultant and the city. Scope does not include any other items that are not specifically mentioned hereon.

All other provisions of the original contract are to remain unchanged.

Authorized by:

RICK ENGINEERING COMPANY Date: November 3, 2025

Signature: Title: Associate Principal
Richard O’Neill, R.C.E. No. 63285, LEED AP, QSD

Authorized by:

City of San Bernardino Public Works

Signature: Date:

Print Name: Title:

Please return a signed copy to RICK ENGINEERING COMPANY.

Docusign Envelope ID: C39E4CCE-3CCA-4874-AD6D-03E32F4C0592 11/4/2025
Lynn Merrill Director of Public Works

← All documents from this meeting