Cities Index.
Attachment 1 - Resolution No. 2026-042 Adopting SUB23-05 and MMRPs

Mayor and City Council
May 6, 2026

Document
Attachment 1 - Resolution No. 2026-042 Adopting SUB23-05 and MMRPs
Meeting
May 6, 2026
Body
Mayor and City Council
Pages
29
Original file
389 KB
Text extracted from the city's file for reading and search. Open the original on sanbernardino.primegov.com. That file is the official record.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 1 of 29 ends

RESOLUTION NO. 2026-042

RESOLUTION OF THE MAYOR AND CITY COUNCIL OF
THE CITY OF SAN BERNARDINO, CALIFORNIA, (1)

ADOPTING THE ADDENDUM TO THE FINAL

SUBSEQUENT ENVIRONMENTAL IMPACT REPORT AND

MITIGATION MONITORING AND REPORTING
PROGRAM (SCH #2007071155) IN COMPLIANCE WITH

CALIFORNIA ENVIRONMENTAL QUALITY ACT
SECTION 15164 (a), AND APPROVING SUBDIVISION NO.
23-05 (TENTATIVE TRACT MAP NO. 20595) TO ALLOW
THE SUBDIVISION OF A 404.3 -ACRE SITE INTO 327
SINGLE-FAMILY RESIDENTIAL LOTS . THE PROJECT
IS LOCATED AT APNS: 265-041-12, 265-051-12, 265-051-13, 265-061-16, 265 -051-09, 265 -021-13, 265 -011-07, 265 -011-08, AND 265 -011-06 WITHIN THE UNIVERSITY HILLS
SPECIFIC PLAN (SP-UH).

WHEREAS, In 1993, the City of San Bernardino Mayor and Common Council approved the Paradise Hills Specific Plan; and

WHEREAS, after adoption of the City of San Bernardino General Plan in 2005, The Paradise Hills Specific Plan was renamed the University Hills Specific Plan (SP -UH) via Resolution 2005-362 adopted November 1, 2005; and

WHEREAS, on November 17 2008, the Mayor and Common Council of the City of San Bernardino adopted Resolution No. 2008-422 certifying the Final Subsequent Environmental Impact Report (California State Clearinghouse No. 2007071155), adopting the Findings of Fact, Statement of Overriding Considerations and Mitigation Monitoring and Reporting Program, and approving Specific Plan 07-01 for the University Hills Specific Plan (SP-UH); and

WHEREAS, on February 27, 2023 , pursuant to the requirements of Chapter 19. 64 (Specific Plans), and Chapter 19. 66 (Subdivisions) of the City of San Bernardino Development Code, an application for Subdivision 23-05 (Tentative Tract Map 20595), was duly submitted by:

Property Owner: Encore University Hills, LLC
770 Tamalpais Drive, #401B
Corte Madera, CA 94925

Applicant: David Hardy
3333 Michelson Drive, Suite 620
Irvine, CA 92612

APN: 0265-041-12, 0265-051-12 and - 13 ; 0 2 6 5-061-16; 0265-011-06, -07, and -08; 0265-051-09; a n d 0265-021-13

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 2 of 29 ends

Lot Area: 404.3 acres

WHEREAS, Subdivision 23-05 (Tentative Tract Map 20595), constitutes a section of the University Hills Specific Plan Project ("Project"); and

WHEREAS, Subdivision 23-05 (Tentative Tract Map 20595) is a request to allow the subdivision of a 404.3-acre site into 327 single-family residential lots and open space; and

WHEREAS, pursuant to the California Environmental Quality Act (“CEQA”; Public Resources Code, Section 21000 et seq.), Section 21067, and State CEQA Guidelines (California Code Regulations, Section 15000 et seq.), Section 15367, the City of San Bernardino is the le ad agency for the Project; and

WHEREAS, pursuant to the requirements of Section 15164(a) (Addendum to an EIR) of the California Environmental Quality Act, the Planning Division of the Community Development and Housing Department accepted the Addendum to the Subsequent Final Environmental Impact Report prepared by Kimly -Horn, environmental consultant for SP 23 -01 and SUB 23 -05 (TTM 20595) on behalf of the applicant due to the fact that: 1) there are no substantial changes in the proposed project that would require major revisions of the p revious Subsequent Final Environmental Impact Report due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2) there are no substantial changes that have occurred with respect to the circumstances under which the proposed project is undertaking which will require major revisions of the previous Subsequent Final Environmental Impact Report due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and, 3) there is no new information of substantial importance which was not known and could not have been known with the exercise of reasonable diligence at the time that the previous Subsequent Final Environmental Impact Report was certified; and

WHEREAS, the Planning Division of the Community Development and Housing Department has reviewed Subdivision 23-05 (Tentative Tract Map 20595) for consistency with the City of San Bernardino General Plan , and compliance with the City of San Bernardino Development Code and University Hills Specific Plan; and

WHEREAS, on December 10, 2025, pursuant to Section 19.44.030 (Project Review) of the City of San Bernardino Development Code, the Development and Environmental Review Committee reviewed the application and forwarded (1) the Addendum to the Subsequent Final Environmental Impact Report and Mitigation Monitoring and Reporting Program (SCH #2007071155), (2) Subdivision 23 -05 (TTM 20595) to the Planning Commission meeting of January 13, 2026 for consideration; and

WHEREAS, on January 13, 2026 the Planning Commission of the City of San Bernardino held a duly noticed public hearing to consider public testimony and the staff report. At the public hearing there was opposition to the “Project” via ten (10) speakers representing the Crestline Soaring Society a paragliding and hand gliding club, and community members Dolores Armstead and Bobby Long who spoke in opposition to the project. After the public comments, the Planning RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 3 of 29 ends

Commission deliberated and a motion was made by Commissioner Carlone and seconded by Commissioner Pratt to approve staff’s recommendation to move Specific Plan Amendment 23-01 to the meeting of the Mayor and City Council for the first reading on May 6, 2026.

The motion was approved per Resolution 2026 -001 by Commissioners; Carlone, I. Garcia, O.

Garcia, Ngalande, Pratt, and Quiel. Commissioners Dailey and Lopez denied, and Commissioner Sherrick was absent. The item passed six (6) to two (2); and

WHEREAS, notice of the May 6, 2026 public hearing for the Mayor and City Council's consideration of this proposed Ordinance was published in The Sun newspaper on April 25, 2026, and was mailed to the owners and tenants of property located within 1,000 feet of the subject property in accordance with Development Code Chapter 19.52 (Hearing and Appeals); and

WHEREAS, at the public hearing conducted by the Mayor and City Council, no additional information submitted to the City Council has produced substantial new information requiring substantial revisions that would trigger recirculation of the Addendum or additional environmental review under State CEQA Guidelines Section 15088.5; and

WHEREAS, pursuant to the requirements of Chapter 19.52 (Hearing and Appeals) and Chapter 19.66 (Subdivision Maps) of the City of San Bernardino Development Code, the Mayor and City Council have the authority to take action on Subdivision 23-05 and the addendum to the Final Subsequent Environmental Impact Report and Mitigation Monitoring and Reporting Program (SCH #2007071155).

BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CIT Y OF SAN BERNARDINO AS FOLLOWS:

SECTION 1. The above recitals are true and correct and are incorporated herein by this reference.

SECTION 2. Compliance with the California Environmental Quality Act. The Mayor and City Council having independently reviewed and analyzed the record before it, including the Addendum to the Subsequent Final Environmental Impact Report and Mitigation Monitoring and Reporting Program (SCH #2007071155), and written and oral testimony, and having exercised their independent judgment, find that there is no substantial evidence supporting a fair argument that approval of the Project will result in a significant effect on the environment.

SECTION 3. Adoption of the Addendum to the Subsequent Final Environmental Impact Report and Mitigation Monitoring and Reporting Program (SCH #2007071155). Based upon the findings made herein and their independent judgment and analysis, the Mayor and City Council hereby adopt the Addendum to the Subsequent Final Environmental Impact Report and Mitigation Monitoring and Reporting Program (SCH #2007071155), attached hereto and incorporated herein by reference as Exhibit B. The Mayor and City Council hereby impose each mitigation measu re as a condition of approval of the Project, in accordance with CEQA and the State CEQA Guidelines.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 4 of 29 ends

SECTION 4. FINDINGS FOR SUBDIVISION 2 3-05 (TENTATIVE TRACT MAP 20595):

Finding No. 1: The proposed map is consistent with the General Plan.

Finding of Fact: The proposal is consistent with General Plan Land Use Goal 2.1 states:
“Preserve and enhance San Bernardino’ s unique neighborhoods ”. The parcel of which the subdivision is proposed for is currently developed with a single-family residence and will conform to the development standards, design guidelines and policies specified within the University Hills Specific Plan (SP-UH) and has consistency with the General Plan goal and policy cited above. Additionally, the proposed project is a permitted land use subject to the approval of a Subdivision with the appropriate Conditions of Approval and CEQA determination . The proposal is also consiste nt with General Plan Land Use Element Policy 2.10.1 in which requires that all decisions related to the physical development and growth of the City of San Bernardino complies with the General Plan. Specifically, the provisions of this plan shall be applied to proposed private development projects.

Finding No. 2: The design and improvements of the proposed subdivision is consistent with the General Plan.

Finding of Fact: General Plan Land Use Goal 2.2 states: Promote development that integrates with surrounding land uses. The proposed Tentative Parcel Map will be consistent with the pattern of the surrounding residential development.

General Plan Land Use policy 2. 7.5 states: Require that developments conform to the availability of public infrastructure to accommodate its demands and mitigate its impacts. The proposed Tentative Parcel Map will connect to existing water and sewer services, create roads and storm drains, and private utilities.

Therefore, the design and improvements of the proposed subdivision is consistent with the General Plan.

Finding No. 3: The site is physically suitable for the type of development.

Finding of Fact: The proposed project is permitted within the University Hills Specific Plan (SP-UH), subject to the approval of Subdivision 2 3-05 (Tentative Parcel Map 20595) and the appropriate Conditions of Approval and adoption of RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 5 of 29 ends

the Addendum to the Final Subsequent Environmental Impact Report (SEIR) and Mitigation Monitoring and Reporting Program (SCH #2007071155). The subject site as a residential development is sufficient in size to accommodate the proposal under Subdivision 23-05 as required by the City of San Bernardino Development Code and the University Hills Specific Plan (SP-UH). Therefore, the subject site is physically suitable for the proposal.

Finding No. 4: The site is physically suitable for the proposed density of development.

Finding of Fact: The proposed site has been designed to meet all of the standards required by the Development Code for the University Hills Specific Plan (SP-UH) in which it is located. The subdivision of the site will not create any inconsistencies with regard to the standard requirements for the Specific Plan as analyzed. Therefore, the site is physically suitable for the proposed density of development.

Finding No. 5: The design of the subdivision (s) and the proposed improvements will not cause substantial environmental damage or substantially or avoidably injure fish or wildlife or their habitat.

Finding of Fact: The design of the subdivision will not have any significant negative impacts to wildlife or their habitat. The project site was analyzed through a SEIR approved in November 2008 and re -analyzed through the Specific Plan Addendum 23-01. No significant negative impacts on the environment are anticipated to result from the proposed development that are not mitigated by the Mitigation Monitoring and Reporting Program.

Finding No. 6: The design of the subdivision (s) or type of improvements will not cause serious public health problems.

Finding of Fact: The design of the proposed subdivision meets all of the applicable Development Code and Specific Plan requirements and will not result in any serious public health problems. The proposed parcels will have access to existing public streets and utilities, and public services will be available to serve the project site and ensure the maintenance of public health and safety.

Finding No. 7: The design of the subdivision(s) or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision.

Finding of Fact: The design of the subdivision will not conflict with any public or private easements. All documentation relating to easements and dedications will be reviewed and approved by the City Engineer prior to recordation of the RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 6 of 29 ends

Final Map. Existing easements will be reserved in place or relocated, as necessary.

SECTION 5. Subdivision 23 -05 (Tentative Tract Map 20595) , a request to allow the subdivision of a 404.3-acre site into 327 single-family residential lots (0265-041-12, 0265-051-12 and -13; 0265 -061-16; 0265 -011-06, -07, and -08; 0265 -051-09; and 0265 -021-13) attached hereto and incorporated herein by reference as Exhibit A, is hereby approved , subject to the following Conditions of Approval:

1. This approval is for the following; Adopt the Addendum to the Final Subsequent Environmental Impact Report and Mitigation Monitoring and Reporting Program (SCH #2007071155) in compliance with the California Environmental Quality Act; (2) approve Specific Plan Amendment No. 23-01 to amend the development standards and guidelines of the original development plan and reduce the number of proposed single -family residential lots from 980 to 327 within the University Hills Specific Plan; (3) approve Subdivision N o. 23 -05 (Tentative Tract Map No. 20595) to allow the subdivision of a 404.3-acre site into 327 single -family residential lots; and (4) dissolve Development Agreement No. 08-02. The project is located at APNs: 0265-041-12, 0265-051-12 and -13; 0265-061-16; 0265-011-06, -07, and -08; 0265 -051-09; and 0265 -021-13 within the University Hills Specific Plan (SP-UH).

2. The project site shall be developed and maintained in accordance with the plans stamped January 13, 2026 (Exhibit “A”), approved by the City, which includes a site plan, floor plan, exterior elevations and concept landscaping plan on file in the Planning Division; the Conditions of Approval contained herein; and, the City’s Municipal Code regulations.

3. The project shall be subject to all of the mitigation measures contained within the Mitigation Monitoring and Reporting Program (Exhibit “B”), dated January 13, 2026 and incorporated herein by reference, as Conditions of Approval.

4. Within two (2) years of the approval of the Subdivision, the commencement of construction shall have occurred, or the permit/approval shall become null and void. In addition, if at any time after the commencement of construction, work is discontinued for a period of one (1) year, then the permit/approval shall become null and void.

However, approval of the Subdivision does not authorize the commencement of construction. All necessary permits must be obtained prior to the commencement of specified construction activities included in the Conditions of Approval.

EXPIRATION DATE: January 13, 2028

5. The review authority may grant a time extension, for good cause, not to exceed twelve (12) months. The applicant must file an application, the processing fees, and all required submittal items thirty (30) days prior to the expiration date. The review autho rity shall ensure that the project complies with all Development Code provisions in effect at the time of the requested extension.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 7 of 29 ends

6. In the event this approval is legally challenged, the City will promptly notify the applicant of any claim, action or proceeding and will cooperate fully in the defense of this matter.

Once notified, the applicant agrees to defend, indemnify and hold harmless the City of San Bernardino (City), any departments, agencies, divisions, boards or commission of the City as well as predecessors, successors, assigns, agents, directors, elected officials, officers, employees, representatives and attorneys of the City from any claim, action or proceeding against any of the foregoing persons or entities.

The applicant further agrees to reimburse the City for any costs and attorneys’ fees, which the City may be required by a court to pay as a result of such action, but such participation shall not relieve applicant of his or her obligation under this condition. The costs, salaries, and expenses of the City Attorney and employees of his office shall be considered as “Attorney’s fees” for the purpose of this condition. As part of the consideration for issuing this Subdivision, this condition shall remain in effect if the Subdivision is rescinded or revoked, whether or not at the request of applicant.

Planning Division

7. Construction-related activities may not occur between the hours of 8:00 pm and 7:00 am.

No construction vehicles, equipment, or employees may be delivered to, or arrive at the construction site before 7:00 am or leave the site after 8:00 pm. Construction activities shall only occur Monday through Friday.

8. (Amended) The applicant shall coordinate with other outside agencies including but not limited to California State University, San Bernardino, San Bernardino County Flood Control, San Bernardino County Fire. All required approvals, permits, and clearances shall be obtained from all outside agencies prior to recordation of the final map and prior to issuance of grading, building, and occupancy permits, as applicable, for the project.

Examples include but are not limited to encroachment permits, access agre ements or Memorandums of Understanding.

9. Development of the residential tracts will require the approval of a Development Permit Type-P prior to the issuance of building, grading, on-site, and off-site permits.

10. The applicant/property owner must sign and have notarized an affidavit acknowledging acceptance of the Conditions of Approval and return it to the Planning Division within thirty (30) days of the effective date of this approval.

11. The project landscape plans shall be in substantial compliance with the Conceptual Landscape plan and prepared in accordance with the Development Code, section 19.28.120 (Water Efficient Landscaping Standards).

12. Minor Modifications to the plans shall be subject to approval by the Director through the Minor Modification Permit process. Any modification that exceeds 10% of the allowable measurable design/site considerations shall require the refilling of the original application.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 8 of 29 ends

13. The project shall comply with all applicable requirements of the Building and Safety Division, San Bernardino Police Department, San Bernardino Municipal Water Department, Public Works Department, and the City Clerk’s Office/Business Registration Division.

14. This approval shall comply with the requirements of other outside agencies (i.e., San Bernardino County Health Department, Division of Environmental Health Services, San Bernardino County Flood Control, San Bernardino County Fire Department, and California Board of Equalization), as applicable.

15. The property owner shall be responsible for regular maintenance of the project site. The site shall be maintained in a clean condition and free of litter or any other undesirable material(s). Vandalism, graffiti, trash, and other debris shall be removed an d cleaned up within twenty-four (24) hours of being reported.

16. Signs are not approved as part of this permit. Prior to establishing any new signs, or to replacing existing signs, the applicant shall submit an application and receive approval for a Sign Permit from the Planning Division. Banners, flags, pennants, and s imilar signs are prohibited unless a Temporary Sign Permit is obtained.

17. Submittal requirements for permit applications (site improvements, landscaping, etc.) to Building Plan Check and/or Land Development must include all Conditions of Approval issued with this approval printed on the plan sheets.

18. If the colors of the buildings or other exterior finish materials are to be modified beyond the current proposal and improvement requirements, the revised color scheme and/or finish materials shall be reviewed and approved by the Planning Division prior to the commencement of work.

19. All new construction shall require permits prior to commencement.

20. (Added) Prior to recordation of the Final Map or the issuance of building permits, whichever comes first, the applicant/developer/property owner shall provide a copy of a recorded agreement between applicant/developer/property owner and California State University, San Bernardino for access into the University Hills project for limited, educational purposes.

21. (Added) Prior to recordation of the Final Map or the issuance of building permits, whichever comes first, the applicant/developer/property owner shall obtain easements or acquire all property necessary from the California State University, San Bernardino, San Bernardino County Flood Control, and any other property owner necessary to provide access to the site from an existing public right of way.

22. (Added) Prior to recordation of the Final Map or the issuance of building permits, whichever comes first, the applicant/developer/property owner shall enter into a Memorandum of Understanding (MOU), or any other agreement deemed appropriate by RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 9 of 29 ends

both parties, with California State University, San Bernardino to address a variety of issues that could include access rights and conditions, construction management and campus protection, fault and land laboratory access, lighting and observatory protect ion, agency review and approval, term and termination, and dispute resolution. A current draft of the MOU will be included for reference as part of the staff report.

23. All Conditions of Approval and standard requirements shall be implemented and/or completed prior to final inspection and/or issuance of a Certificate of Occupancy.

Building & Safety Division

24. The Building and Safety Division has no material objection to the present proposal that would prevent the project from proceeding in the entitlement process. Please note that our review is limited to project feasibility and was not reviewed for building code compliance or to establish project conditions of approval.

25. The subdivision will require geotechnical reports for each prepared by a qualified geotechnical engineer.

Public Works Department – Engineering Division

26. Drainage and Flood Control
a) All necessary drainage and flood control measures shall be subject to requirements of the Building Official, which may be based in part on the recommendations of the San Bernardino County Department of Transportation and Flood Control. The developer's Engineer shall furnish all necessary data relating to drainage and flood control.

b) A permit will be required from the San Bernardino County Department of Transportation and Flood Control, if any work is required within the Flood Control District's right-of-way.

c) A local drainage study will be required for the project. Any drainage improvements, structures or storm drains needed to mitigate downstream impacts or protect the development shall be designed and constructed at the developer's expense, and right - of-way dedicated as necessary.

d) All drainage from the development shall be directed to an approved public drainage facility. If not feasible, proper drainage facilities and easements shall be provided to the satisfaction of the City Engineer.
e) If site drainage is to be discharged into the public street, the drainage shall be conveyed through a parkway culvert constructed in accordance with City Standard No. 400.

Conveyance of site drainage over the Driveway approaches will not be permitted.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 10 of 29 ends

f) A Final Full-Categorical Water Quality Management Plan (WQMP) is required for this project. The applicant is directed to the County of San Bernardino’s Flood Control web page for the template and Technical Guidance Document. The Land Development Division, prior to issuance of any permit, shall approve the WQMP. A CD/USB copy of the approved WQMP and Hydrology Study shall be required prior to grading permit issuance.

g) A Storm Water Pollution Prevention Plan (SWPPP) will be required. The applicant is directed to State Water Resources Control Board (SWRCB) SMART Login system.

The SWPPP shall be approved by the State and a CD/USB copy of the approved SWPPP shall be submitted to City prior to grading permit issuance.

h) A "Notice of Intent (NOI)" shall be filed with the State Water Resources Control Board for construction disturbing 1 acre or more of land (including the project area, construction yards, storage areas, etc.). A WDID number issued by the State of California is required prior to the issuance of grading permit.

i) The Land Development Division, prior to grading plan approval, shall approve an Erosion Control Plan. The plan shall be designed to control erosion due to water and wind, including blowing dust, during all phases of construction, including graded areas which are not proposed to be immediately built upon.

27. Grading and Landscaping
a) The grading and on -site improvement plan shall be signed by a Registered Civil Engineer, and a grading permit will be required. The grading plan shall be prepared in strict accordance with the City's "Grading Policies and Procedures" and the City's "Standard Drawings", unless otherwise approved by the Building Official.

b) If the grading plan indicates export or import, the source of the import material or the site for the deposition of the export shall be noted on the grading plan. Permit numbers shall be noted if the source or destination is in the City of San Bernardino.

c) If more than 50 cubic yards of earth is to be hauled on City Streets then a special hauling permit shall be obtained from the City Engineer. Additional conditions, such as truck route approval, traffic controls, bonding, covering of loads, street cleaning, etc. may be required by the City Engineer.

d) One 4' x 11' PCC pad at least 4" thick shall be provided in the rear or side yard area of each lot for storage of recycling containers. The pad shall be screened from public view and a 3' wide concrete walkway shall be provided from the driveway to the pad . All gates along the access way shall have a minimum clear width of 3'-6".

e) A liquefaction evaluation is required for the site. This evaluation must be submitted and approved prior to issuance of a grading permit. Any grading requirements RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 11 of 29 ends

recommended by the approved liquefaction evaluation shall be incorporated in the grading plan.

f) Wheel stops are not permitted by the Development Code, except at designated accessible parking spaces. Therefore, continuous 6” high curb shall be used around planter areas and areas where head in parking is adjacent to walkways. The parking spaces may be 16.5’ deep and may overhang the landscaping or walkway by 2.5’.

Overhang into the setback area or into an ADA path of travel (minimum 4’ wide) is not permitted.

g) Retaining walls, block walls and all on -site fencing shall be designed and detailed on the on -site improvement Plan. This work shall be part of the on -site improvement permit issued by the Building Official. All masonry walls shall be constructed of decorative block with architectural features acceptable to the City Planner.

h) No construction on a site shall begin before a temporary/security fence is in place and approved by the Building Official or his designee. Temporary/security fencing may not be removed until approved by the Building Official or his designee. The owner or owner’s agent shall immediately remove the temporary/security fencing upon the approval of the Building Official or his designee. Sites that contain multiple buildings shall maintain the temporary/security fencing around the portion of the site and buildings under construction as determined by the Building Official or his designee.

All temporary/security fencing for construction sites shall include screening, emergency identification and safety identification and shall be kept in neat and undamaged condition.

i) The design of on -site improvements shall also comply with all requirements of The California Building Code, Title 24, relating to accessible parking and accessibility, including retrofitting of existing building access points for accessibility, if applicable.

j) The project Landscape Plan shall be reviewed and approved by the Land Development Division prior to issuance of a grading permit. Submit 3 copies to the Land Development Division for Checking.

k) The public right -of-way, between the property line and top of curb (also known as “parkway”) along adjoining streets shall be landscaped by the developer and maintained in perpetuity by the property owner. Details of the parkway landscaping shall be included in the project’s on-site landscape plan.

28. On-Site Utilities
a) Design and construct all public utilities to serve the site in accordance with City Code, City Standards and requirements of the serving utility, including gas, electric, telephone, water, sewer and cable TV (Cable TV optional for commercial, industrial, or institutional uses).

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 12 of 29 ends

b) Backflow preventers shall be installed for any building with the finished floor elevation below the rim elevation of the nearest upstream manhole. c) This project is located in the sewer service area maintained by the City of San Bernardino therefore, any necessary sewer main extension shall be designed and constructed in accordance with the City's "Sewer Policy and Procedures" and City Standard Drawings.

d) Utility services shall be placed underground and easements provided as required.

e) Existing Utilities which interfere with new construction shall be relocated at the Developer's expense as directed by the City Engineer.

f) Sewers within private streets or private parking lots will be maintained by SBMWD but shall be designed and constructed to City Standards and inspected under a City On- Site Construction Permit. A private sewer plan designed by the Developer's Engineer and approved by the City Engineer will be required. This plan can be incorporated in the grading plan, where practical.

29. Mapping
a) A Final Tract Map based upon field survey will be required. b) The applicant‘s surveyor/engineer shall submit a Final Tract Map with supporting documents for review and approval to Land Development. The Final Tract map shall be recorded prior to building permit issuance.

30. Off-Site Street Improvement and Dedications
a) For the streets listed below, dedication of adequate street right -of-way (R.W.) per the General Plan (Chapter 6) and Municipal Code (19.20.030-18-A,19.30.290, 19.30.300), shall provide the distance from street centerline to property line and placement of the curb line (C.L.) in relation to the street centerline shall be as follows:

Street Name
Dedication shall be
Right of Way(ft.)
From Centerline
Curb Widening shall be
Curb Line(ft)
From Centerline
Campus Parkway

PRIVATE
(265-011-06, 265-011-07
265-011-08, 265-021-13
265-041-12, 265-051-09
265-051-12, 265-051-13
265-061-16)
0’ Existing
30’ – 60’ Dedication/Road
Easement
for a total ½ width of 30’ –
60’ Total
“Secondary Arterial”

0’ Existing
32’ – 64’ Proposed w/o Median
34’ – 68’ w/median
for a total ½ width of 32’ – 64’
or 34’ – 68’ Total
Per General Plan
Secondary Road
Badger Canyon Road

PRIVATE
(265-011-06, 265-011-07
265-011-08, 265-021-13
265-041-12, 265-051-09
265-051-12, 265-051-13
0’ Existing
22’ - 44’ Dedication/Road
Easement
for a total ½ width of 22’ –
44’
“Collector Street”
No Parking
0’ Existing
20’ - 40’ Proposed
for a total ½ width of 20’ – 40’
Per General Plan
”No Parking”
RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 13 of 29 ends

Any changes from private roads shall require streets to follow City General Plan standards.

b) Campus Parkway– TI = 7.5 : * - **
i. The street shall be rehabilitated to meet the requirements detailed in a soils report based on the “R” value of the subgrade and the Traffic Index, or The City’s has a minimum standard for new streets (4” AC over 8” Base) except truck usage (9”AC over 12” Base); However, if the Soils Report is obtained and indicates a thicker improvement, the thicker section shall be used.
ii. For transitioning from new curb alignment to existing edge of pavement outside project limits the edge shall be a deepened or thickened. Use Caltrans Design Manual or A Policy on Geometric Design of Highways and Streets for taper requirements.
iii. Both sides of Campus Parkway Street shall be paved as indicated above, As directed by the City Engineer.
iv. When Striping, all striping shall be thermoplastic paint per section 84 of the Caltrans specifications.
265-061-16)
Continuous Streets
(Main Loop Streets)
A and C
(PRIVATE)
(265-011-06, 265-011-07
265-011-08, 265-021-13
265-041-12, 265-051-09
265-051-12, 265-051-13
265-061-16)
0’ Existing
30’ Dedication
for a total ½ width of 30’
60’ Total
“Continuous Street”
(Main Loop Streets)

0’ Existing
22’ – 44’ Proposed
for a total ½ width of 22’ – 44’
Per General Plan

Continuous Streets

B, D, E, F, G, H, I, J, K, L, M,

N, O, X, Y, Z

PRIVATE
(265-011-06, 265-011-07
265-011-08, 265-021-13
265-041-12, 265-051-09
265-051-12, 265-051-13
265-061-16)

0’ Existing
25’ – 50’ Dedication
for a total ½ width of 25’ –
50’ Total
“Continuous Street”
(Neighborhood Local)
Required 48” ADA By-pass

0’ Existing
18’ -36’ Proposed
for a total ½ width of 18’ – 36’
Per General Plan
Cul-De-Sac Streets

G, I, M, L

PRIVATE
(265-011-06, 265-011-07
265-011-08, 265-021-13
265-041-12, 265-051-09
265-051-12, 265-051-13
265-061-16)
0’ Existing
25’ Dedication
for a total ½ width of 25’
“Cul-De-Sac”
Required 48” ADA By-pass
0’ Existing
18’ Proposed
for a total ½ width of 18’
Per General Plan
RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 14 of 29 ends

v. The corner shall be a 35’ Radius including a compliant ADA ramp with By-Pass and Truncated Domes. City of San Bernardino - Street Improvement Policy.
vi. Installation of a bridge shall be determined by the reports and as directed by the City Engineer.
vii. Construct 8" Curb and Gutter per City Standard No. 200, type “B”, As directed by the City Engineer. City of San Bernardino - Street Improvement Policy.
viii. Construct 6’ wide Cross Gutter with Apron per City Standard No 201 City of San Bernardino - Street Improvement Policy.
ix. Construct Sidewalk per City Standard No. 202; Case "A" (6’ wide adjacent to curb), as directed by the City Engineer. MC12.92.050, MC19.30.170, Ord. MC -1027, 9-09-98; Ord. MC -691, 12-19-89, City of San Bernardino - Street Improvement Policy.
x. Construction of a median/fire lane on Campus Parkway shall be per City Standard 206.
xi. Verify with planning about a Trial System, Include Horse Trail, Running Trail, connect to existing trials systems.
xii. An ADA Ramp shall be constructed at corner in accordance with the SPPWC (Standard Plans for Public Works Construction) or Caltrans Standard plans A88A, as directed by the City Engineer. Federal Highway – DIB82-04, City of San Bernardino - Street Improvement Policy.
xiii. Install Dark Sky Solar LED Street Lights adjacent to the site in accordance with City Standards. Also, when more than three (3) streetlights a separate street light plan sheet shall be submitted in the Offsite Improvement set in accordance with the City of San Bernardino Street Lighting Design Policies. Install ID Plate on Street light pole. xiv. Install Storm Drain per County of San Bernardino’s CSDP (Comprehensive Storm Drain Plan), as directed by the City Engineer. xv. Install Class II Bike Lane per “Manual Uniform Traffic Control Devices - California”, as directed by the City Traffic Engineer, SBCTA (San Bernardino County Transportation Authority) Non-Motorized Transportation Plan rev. 2018.
xvi. Install a city approved trash screen and filtration device in the catch basins, City of San Bernardino Phase I MS4 - Trash Provisions 13383 Order – 8-30-2017 by City Manager.
xvii. Appropriate Permits from Fish and Game, Army Corp of Engineers, Regional Water, and any others shall be required if Badger Canyon and percolation Basins are determined to be a blue line stream. xviii. Appropriate Permits from County Flood Control, Municipal Water, Metro Water District and any others shall be required when adjacent, over, or under any of these Municipalities.
xix. No Parking/Stopping will be allowed on Campus Parkway install signs per city standards.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 15 of 29 ends

xx. Survey Monuments and ties shall be placed, replaced, tied out and recorded at any corner or alignment changes that are adjacent to the project area in accordance with California Land Surveyors Association – Monument Preservation Guidelines, Copies of Recor ded Monuments/Ties shall be delivered to Public Works/Engineering. xxi. No Residential Driveway Access
xxii. Install a Traffic barrier on the south side of Campus parkway in areas adjacent to the existing CSUSB facilities yard.
xxiii. If a gate is constructed on Campus parkway, it shall be placed east of the future Campus Circle connection to allow free flow of traffic from Campus Parkway to CSUSB.

Badger Canyon Road Secondary Access Street – TI = 7.5 : * - ** xxiv. The street shall be rehabilitated to meet the requirements detailed in a soils report based on the “R” value of the subgrade and the Traffic Index, or The City’s has a minimum standard for new streets (4” AC over 8” Base) except truck usage (9”AC over 12” Base); However, if the Soils Report is obtained and indicates a thicker improvement, the thicker section shall be used.
xxv. For transitioning from new curb alignment to existing edge of pavement outside project limits the edge shall be a deepened or thickened. Use Caltrans Design Manual or A Policy on Geometric Design of Highways and Streets for taper requirements.
xxvi. Both sides of Little Mountain Drive, Secondary Access Road called Future Connection shall be paved as indicated above, As directed by the City Engineer.
xxvii. Installation of a bridge shall be determined by the reports and as directed by the City Engineer.
xxviii. When Striping, all striping shall be thermoplastic paint per section 84 of the Caltrans specifications.
xxix. The corner shall be a 35’ Radius including a compliant ADA ramp with By-Pass and Truncated Domes. City of San Bernardino - Street Improvement Policy.
xxx. Construct 8" Curb and Gutter per City Standard No. 200, type “B”, as directed by the City Engineer. City of San Bernardino - Street Improvement Policy.
xxxi. Construct 6’ wide Cross Gutter with Apron per City Standard No 201, as directed by the City Engineer. City of San Bernardino - Street Improvement Policy.
xxxii. An ADA Ramp shall be constructed at corner in accordance with the SPPWC (Standard Plans for Public Works Construction) or Caltrans Standard plans A88A, as directed by the City Engineer. Federal Highway – DIB82-04, City of San Bernardino - Street Improvement Policy.
xxxiii. Install Solar LED Street Lights adjacent to the site in accordance with City Standards. Also, when more than three (3) streetlights a separate RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 16 of 29 ends

street light plan sheet shall be submitted in the Offsite Improvement set in accordance with the City of San Bernardino Street Lighting Design Policies. Install ID Plate on Street light pole.
xxxiv. Install Storm Drain per County of San Bernardino’s CSDP (Comprehensive Storm Drain Plan), as directed by the City Engineer. xxxv. Install a city approved trash screen and filtration device in the catch basins, City of San Bernardino Phase I MS4 - Trash Provisions 13383 Order – 8-30-2017 by City Manager.
xxxvi. Appropriate Permits from Fish and Game, Army Corp of Engineers, Regional Water, and any others shall be required if Devils Canyon Levy facility is determined to be a blue line stream.
xxxvii. Appropriate Permits from County Flood Control, Municipal Water, Metro Water District and any others shall be required when adjacent, over, or under any of these Municipalities.
xxxviii. No Parking/Stopping will be allowed on Badger mountain Canyon Road Secondary Access Road called Future, install signs per city standards. xxxix. At least 28 feet of pavement shall be provided along streets adjacent to the subdivision, unless otherwise approved by the City Engineer. xl. Two Independent means of access 28’ wide paved and dedicated shall be provided to the project. Additional width may be required for drainage control and traffic safety.
xli. Survey Monuments and ties shall be placed, replaced, tied out and recorded at any corner or alignment changes that are adjacent to the project area in accordance with California Land Surveyors Association – Monument Preservation Guidelines, Copies of Recor ded Monuments/Ties shall be delivered to Public Works/Engineering. xlii. No Residential Driveway Access.

Continuous (Main Loops Streets)/Continuous Streets (Neighborhood Local Streets) – TI =

5.5:
xliii. The street shall be rehabilitated to meet the requirements detailed in a soils report based on the “R” value of the subgrade and the Traffic Index, or The City’s has a minimum standard for new streets (4” AC over 8” Base) except truck usage (9”AC over 12” Base); However, if the Soils Report is obtained and indicates a thicker improvement, the thicker section shall be used.
xliv. When Striping, all striping shall be thermoplastic paint per section 84 of the Caltrans specifications.
xlv. The corner shall be a 35’ Radius including a compliant ADA ramp with By-Pass and Truncated Domes. City of San Bernardino - Street Improvement Policy.
xlvi. Construct Residential Driveway Approach per City Standard No. 203, including an accessible by -pass around the top of the drive approach.

No Driveways closer than 100’ from BCR/ECR as directed by the City Engineer. On corner lots only one frontage may have a driveway.

MC12.28.060, MC12-28-100, MC15.04.230, MC16.20.030, 19.24.060, RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 17 of 29 ends

MC19.30.200, Ord. MC-1027, 9-09-98; Ord. MC -460, 5-15-85; Ord.

MC-320, 12 -06-83; Ord. 3918, 2 -25-80; Ord. 2519, 8 -20-63; Ord. 1963, 11 -18-52, Ord. MC -1531, 6 -03-20, City of San Bernardino - Street Improvement Policy.
xlvii. If public street, construct 8" Curb and Gutter per City Standard No. 200, type “B”. City of San Bernardino - Street Improvement Policy. If private street, 6” Curb and Gutter is allowed.
xlviii. Construct 6’ wide Cross Gutter with Apron per City Standard No 201 City of San Bernardino - Street Improvement Policy.
xlix. Construct Sidewalk per City Standard No. 202; Case "A" (6’ wide adjacent to curb), MC12.92.050, MC19.30.170, Ord. MC -1027, 9-09- 98; Ord. MC -691, 12 -19-89, City of San Bernardino - Street Improvement Policy.
l. Verify with planning about a Trial System, Include Horse Trail, Running Trail, connect to existing trials systems.
li. An ADA Ramp shall be constructed at corner in accordance with the SPPWC (Standard Plans for Public Works Construction) or Caltrans Standard plans A88A. Federal Highway – DIB82-04, City of San Bernardino - Street Improvement Policy.
lii. Install Solar LED Street Lights adjacent to the site in accordance with City Standards. Also, when more than three (3) streetlights a separate street light plan sheet shall be submitted in the Offsite Improvement set in accordance with the City of San Ber nardino Street Lighting Design Policies. Install ID Plate on Street light pole. Supply one (1) additional head for each solar head installed, As Directed by the City Traffic Engineer.
liii. Install Storm Drain per County of San Bernardino’s CSDP (Comprehensive Storm Drain Plan), as directed by the City Engineer. liv. Install type II Bike Lane per “Manual Uniform Traffic Control Devices - California”, as directed by the City Traffic Engineer, SBCTA (San Bernardino County Transportation Authority) Non-Motorized Transportation Plan rev. 2018.
lv. Install a city approved trash screen and filtration device in the catch basins, City of San Bernardino Phase I MS4 - Trash Provisions 13383 Order – 8-30-2017 by City Manager.
lvi. Appropriate Permits from County Flood Control, Municipal Water, Metro Water District and any others shall be required when adjacent, over, or under any of these Municipalities.
lvii. Survey Monuments and ties shall be placed, replaced, tied out and recorded at any corner or alignment changes that are adjacent to the project area in accordance with California Land Surveyors Association – Monument Preservation Guidelines, Copies of Recor ded Monuments/Ties shall be delivered to Public Works/Engineering. lviii. Driveway Access from one frontage only
lix. B Street shall post signs to allow parking on one side of the street only for fire safety reason.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 18 of 29 ends

Cul-De-Sac Streets – TI = 4.5 : * - **
lx. The street shall be rehabilitated to meet the requirements detailed in a soils report based on the “R” value of the subgrade and the Traffic Index, or The City’s has a minimum standard for new streets (4” AC over 8” Base) except truck usage (9”AC over 12” Base); However, if the Soils Report is obtained and indicates a thicker improvement, the thicker section shall be used.
lxi. When Striping, all striping shall be thermoplastic paint per section 84 of the Caltrans specifications.
lxii. The corner shall be a 35’ Radius including a compliant ADA ramp with By-Pass and Truncated Domes. City of San Bernardino - Street Improvement Policy.
lxiii. Construct “Cul-De-Sac” Per City Standard No. 101, or by the approval of the City Engineer.
lxiv. Construct Residential Driveway Approach per City Standard No. 203, including an accessible by -pass around the top of the drive approach.

No Driveways closer than 100’ from BCR/ECR as directed by the City Engineer. On corner lots only one frontage may have a driveway.

MC12.28.060, MC12-28-100, MC15.04.230, MC16.20.030, 19.24.060, MC19.30.200, Ord. MC-1027, 9-09-98; Ord. MC -460, 5-15-85; Ord.

MC-320, 12 -06-83; Ord. 3918, 2 -25-80; Ord. 2519, 8 -20-63; Ord. 1963, 11 -18-52, Ord. MC -1531, 6 -03-20, City of San Bern ardino - Street Improvement Policy.
lxv. If public street, construct 8" Curb and Gutter per City Standard No. 200, type “B”. City of San Bernardino - Street Improvement Policy. If private street, construct 6” Curb and Gutter is allowed. lxvi. Construct 6’ wide Cross Gutter with Apron per City Standard No 201 City of San Bernardino - Street Improvement Policy.
lxvii. Construct Sidewalk per City Standard No. 202; Case "A" (6’ wide adjacent to curb), MC12.92.050, MC19.30.170, Ord. MC -1027, 9-09- 98; Ord. MC -691, 12 -19-89, City of San Bernardino - Street Improvement Policy.
lxviii. Verify with planning about a Trial System, Include Horse Trail, Running Trail, connect to existing trials systems.
lxix. An ADA Ramp shall be constructed at corner in accordance with the SPPWC (Standard Plans for Public Works Construction) or Caltrans Standard plans A88A. Federal Highway – DIB82-04, City of San Bernardino - Street Improvement Policy.
lxx. Install Solar LED Street Lights adjacent to the site in accordance with City Standards. Also, when more than three (3) streetlights a separate street light plan sheet shall be submitted in the Offsite Improvement set in accordance with the City of San Ber nardino Street Lighting Design Policies. Install ID Plate on Street light pole. Supply one (1) additional head for each solar head installed, As Directed by the City Traffic Engineer.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 19 of 29 ends

lxxi. Install Storm Drain per County of San Bernardino’s CSDP (Comprehensive Storm Drain Plan), as directed by the City Engineer. lxxii. Install a city approved trash screen and filtration device in the catch basins, City of San Bernardino Phase I MS4 - Trash Provisions 13383 Order – 8-30-2017 by City Manager.
lxxiii. Survey Monuments and ties shall be placed, replaced, tied out and recorded at any corner or alignment changes that are adjacent to the project area in accordance with California Land Surveyors Association – Monument Preservation Guidelines, Copies of Recor ded Monuments/Ties shall be delivered to Public Works/Engineering. lxxiv. Driveway Access from one frontage only.

* These Conditions are set for an estimated construction with-in two years. If construction exceeds two years from DERC Approval these conditions shall be reviewed and updated as needed.

** If a Scoping Form is required, this form shall indicate the need of a Traffic Report, the results of the traffic report shall become conditions of this project which may increase or extend the above requirements in section 1(b) and 5(a).

c) With Submittal of improvement plans including but not limited to grading plans, Street improvement plans, storm drain and retention/detention basin plans, and erosion/sediment control plans, The Applicant shall cause to be formed, or shall be annexed into an existing, Community Facilities District(s) (CFD) (2019-1 Maintenance if Public & 2018 -1 Safety) for landscaping, lighting, streets, drainage facilities, street sweeping, graffiti removal, or other infrastructure, and safety as required by the City to the satisfaction of the City Engineer. If Public, The Applicant shall initiate the maintenance and benefit assessment district(s) formation, or annexation, by submitting a landowner petition and consent form (provided by the City) and deposited necessary fees concurrent with the application for street and grading plan review and approval; and said maintenance and benefit assessment district(s) shall be established concurrent with the approval of the final map in the case of the subdivision of land, or prior issuance of any certificate of occupancy where there is no subdivision of land, and as approved by the City Engineer. Reso 2018-264, Reso 2019-178. d) If a drainage report is required by Land Development, A second copy of the drainage report will be delivered to public works, if offsite or overflow storm drain systems are identified, all systems shall be identified on the street improvement plans, and pu blic storm drain shall be on a separate set of plans.
e) City approved trash screens and filtration devices shall be installed in all catch basins or manhole connections. City of San Bernardino Phase I MS4 - Trash Provisions 13383 Order – 8-30-2017 by City Manager.
f) A temporary construction encroachment permit from Public Works Department shall be required for utility cuts into existing streets or any work within City’s right-of-way.

Pavement restoration or trench repair shall be in conformance with City Standard No. 310. Public facilities shall be restored or constructed back to Public Works Department satisfaction.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 20 of 29 ends

g) Any pavement works affecting the traffic loop detectors shall be coordinated and subjected to Public Works Traffic Division requirements. h) The applicant must post a performance bond (Insurance, Deposit) prior to issuance of the off -site permit. The amount of the bond is to be determined by Public Works Department. MC12.03.110, Ord. MC-1027, 9-09-98; Ord. MC-1004, 10-21-97. i) The above conditions shall comply with current codes, policies, and standards at time of construction.
j) No Direct Connections to City’s underground Storm Drain Systems or Catch Basins. k) Prior to Certificate of Occupancy or Completion of Project all As-builts and Centerline Ties shall be submitted to Public Works.
l) Release of “Offsite Bond” requires an application and fees paid along with As -Builts signed by the Contractor and Inspector on a signed approved set of plans issued with permits, Centerline ties for all locations disturbed or created, and an electronic set of as-builts plans.

31. Required Engineering Plans
a) A complete submittal for plan checking shall consist of (MC19.30.170, City of San Bernardino Public Works - Improvement Policies):
▪ street improvement plans (include general notes, engineering conditions, city standards, and cross sections in these plans),
▪ if storm drain plans are required then public storm drains must be included on separate sheets with profiles in the street improvement plans, private storm drains shall be shown separate sheets with profiles in the on -site improvement plans,
▪ if traffic signal modifications are required, then traffic signal plans shall be submitted on separate plan sheets included in the street improvement plans, ▪ if signing and striping are required, then the signing and striping plan shall be on separate sheets included in the street improvement plans, ▪ if lighting is required (more than 2) then the lighting for offsite plans shall be on separate sheets included in the street improvement plans, if two (2) or less then they can be included directly on the street improvement sheets, ▪ If there are public common areas, CFD’s are required, the CFD Plans shall include Landscaping, Irrigation, Basins, etc. items that are included in the CFD that are not listed in the plans above, shall be on separate sheets included in the street improvement plans.
▪ other plans as required. Piecemeal submittal of various types of plans for the same project will not be allowed.
▪ All required supporting calculations, studies and reports must be included in the initial submittal (including but not limited to drainage studies, soils reports, structural calculations).

b) All off-site improvement plans submitted for plan check shall be prepared on the City’s standard 24” x 36” sheets. A signature block (city standard block) satisfactory to the City Engineer or his designee can be found on the City Web Site http://www.sbcity.org/city_hall/public_works/engineering_division/engineering_deve RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 21 of 29 ends

lopment_resources Engineering conditions of the project shall be inserted in the last pages of the plans.

c) After completion of plan checking, final mylar drawings with city standard block, stamped and signed by the Registered Civil Engineer in charge, shall be submitted to the City Engineer for approval.

d) Electronic files of all improvement plans/drawings shall be submitted to the City Engineer. The files shall be compatible with AutoCAD 2021 and include a .dxf file of the project. Files shall be on CD and shall be submitted at the same time the final mylar drawings are submitted for approval.

e) Copies of the City’s policies and procedures and standard drawings are available at the Public Works Counter for the cost of reproduction. They are also available at no charge at the Public Works Web Site at
http://www.sbcity.org/city_hall/public_works/engineering_division/design_policy_an d_procedure_documents.

32. Traffic Requirements
a) In general, as applicable, all roadway design, traffic signing and striping, traffic signal, street lighting, sidewalks and traffic control improvements relating to the proposed project should be constructed in accordance with applicable engineering standards and to the satisfaction of the City of San Bernardino Traffic Engineering Division.

b) In conjunction with standard City of San Bernardino development review procedures, on‐site traffic signing, and striping plans should be prepared in accordance with applicable State and Federal standards.

c) The final grading, landscaping, and street improvement plans should demonstrate that sight distance standards are met in accordance with applicable City of San Bernardino /California Department of Transportation sight distance standards.

d) Payment of applicable of local and regional development impact fees shall be paid to the City of San Bernardino.

e) The developer will submit engineered plans for the improvements for University Parkway at Northpark Boulevard: Add a second northbound left-turn lane.

f) Prior to submission of the offsite improvement plans, the developer will prepare a Traffic signal warrant analysis study for the intersection of Campus Parkway and Devils Canyon Road.

Public Works Department – Integrated Waste Division

33. Integrated Solid Waste Management
RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 22 of 29 ends

a) During demolition and/or construction, services are to be provided through the City of San Bernardino’s franchised hauler Burrtec Waste Industries, Inc. b) Project Description: Amend the development plan for the University Hills Specific Plan

c) Burrtec Waste review: Construct a 437 -unit small lot residential subdivision with a minimum parcel size of 2,750 square feet. The Site Plan dated 8/19/22, presents a preliminary design for a subdivision. Lots front a series of looped streets and cul -de- sacs. No dimensions are provided. Burrtec comments are as follows:

1. Please provide dimensions for all streets and cul -de-sacs. In order to safely provide
residential cart service, all streets must have a paved section of at least 30 feet.

2. All cul-de-sacs must meet City of San Bernardino standards for cul-de-sac radii.

3. Residential collection services require a minimum of ten feet of curb frontage in order to stage the three carts for trash, mixed recyclables, and residential organics.

4. Carts shall not be staged in driveways or in front of garages. Carts cannot be staged in front of parked carts on the street.

5. In the event that cart service cannot be provided due to a lack of available curb face for cart staging, the locations of trash enclosures shall be provided on the Site Plan. Enclosures must be within 150 feet of any residential unit.

Any changes to the overall project design, enclosure specifications or location, or access may adversely impact Burrtec's ability to service the project. Any design modifications that could impact Burrtec's service will be subject to review and approval by Burrtec.

Burrtec's review of this project is limited to determining whether it meets Burrtec's minimum standards for waste and recycling collection services. Any comments or approvals by Burrtec are limited to these minimum standards as they relate to our equipment and personnel and do not pertain to the project's compliance with applicable federal, state and local land use and environmental laws, building codes or other applicable government regulations. Any approvals by Burrtec do not warrant or represent that Bur rtec accepts any liability relative to the performance of waste and recycling collection services within this project.

End of Burrtec comments.

d) Each single-family residential unit requires approximately 10 feet of clear space on the street along the curb adjacent to the driveway, for placement of the residential carts for trash, mixed recyclables, and residential organics on collection day, with a minimum 2- foot setback and 23 -foot vertical clearance of all obstructions such as walls, trees, streetlight poles, mailboxes, fences, and raised landscaping.

e) Each single-family residential unit requires a minimum 4’x11’concrete pad located out of view of the public right-of-way for the storage of residential carts. If visible from the public right-of-way, the storage area shall be screened.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 23 of 29 ends

f) A minimum 10.5-foot space on the street along the curb adjacent to the driveway of each unit shall be clear for placement of the units’ residential carts on collection day, with a minimum 2-foot setback and 23 -foot vertical clearance of all obstructions su ch as walls, trees, street light poles, mailboxes, fences, and raised landscaping.

g) Burrtec Waste Truck Turning Radius – All corners and intersections on streets and driveways, shall have a turning radius adequate for a 35 -foot long, three -axle collection truck. The minimum inside curb radius shall be at least 28 feet. The minimum outside curb radius shall be at least 42 feet. All streets and driveways shall comply with applicable City standards. Burrtec Waste’s truck turning template may be obtained from the Public Works Department in PDF and CAD.

h) Hammerhead Turnarounds shall meet or exceed San Bernardino County Fire Protection District Diagram A -1.12: Hammerhead Turnaround Detail dated July 1, 2021. San Bernardino County Hammerhead detail may be obtained from the Public Works Department.

i) If gated, access shall be provided by means of a key, code, or remote.

j) Senate Bill 1383 Short-Lived Climate Pollutants Reduction Act may apply.

k) Upon completion, service is provided through the City of San Bernardino’s franchised hauler Burrtec Waste Industries, Inc. 111 E. Mill Street, San Bernardino, CA 92408 (909) 804-4222.

34. Required Engineering Permits
a) Grading and On-site improvements permit (LD).
b) WQMP/Hydrology (THR).
c) Lot Merger (LM).
d) Off-site improvement construction permit. (E).
e) Traffic Control and Right-of-Way permit (ROW).
f) CFD/Street Dedication permit (RP).

35. Applicable Engineering Fees
a) All plan check, permit, inspection, and impact fees are outlined on the Public Works Fee Schedule. A deposit in the amount of 100% of the estimated checking fee for each set of plans will be required at time of application for plan check. The amount of t he fee is subject to adjustment at time of issuance.
b) The current fee schedule is available at the Public Works Counter and at http://www.sbcity.org or http://www.ci.san-
bernardino.ca.us/cityhall/publicworks/engineering_division/engineering_fee_schedul e.asp

36. Water Department-Engineering
RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 24 of 29 ends

a) If there are any street improvements associated with the project then it is the developer/s and/or engineer/s responsibility to submit a copy of the street improvements plans to SBMWD’S engineering section for review. b) -Water and sewer main extensions with easements may be required. c) -Water and sewer main extensions required per rule and regulation no. 20. d) -Development of new pressure zone required to meet water demand. e) R.P.P. Backflow Device Required at Service Connection for Domestic Service. f) Double Check Backflow Device Required at Service Connection for Fire and Irrigation.
g) Backflow Device to be Inspected before Water Service can be Activated. h) Sewer capacity fee must be 0 gallons a day paid to the Water Department. i) Subject to Recalculation of Fee prior to the Issuance of Building Permit.

37. Water Department Environmental Control

a) No comments until the development of the residential units.

San Bernardino County Fire Department Consolidated Conditions of Approval

38. The above referenced project is under the jurisdiction of the San Bernardino County Fire Department herein “Fire Department”. Prior to any construction occurring on any parcel, the applicant shall contact the Fire Department for verification of current fire protection requirements. All new construction shall comply with the current California Fire Code requirements and all applicable statutes, codes, ordinances, and standards of the Fire Department.

39. The FMZ report as included in University Hills Specific Plan dated May 2024 has been approved as submitted. A copy of this approved report shall be kept onsite in the HOA Office to reference FMZ areas for future yearly inspections. Building permits shall not be issued for this project until all fuel modifications are completed by contractor and inspected by the San Bernardino County Fire Protection District, Office of the Fire Marshal.

40. The required fire fees shall be paid to the San Bernardino County Fire Department/Community Safety Division.

41. Prior to combustibles being placed on the project site an approved all -weather fire apparatus access surface and operable fire hydrants with acceptable fire flow shall be installed. The topcoat of asphalt does not have to be installed until final inspectio n and occupancy.

42. Building plans shall be submitted to the Fire Department for review and approval.

43. The development shall have a minimum of three points of vehicular access. These are for fire/emergency equipment access and for evacuation routes. a. Single Story Road Access Width. All buildings shall have access provided by approved roads, alleys and pri vate drives with a minimum twenty-six (26) foot unobstructed width and vertically to fourteen RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 25 of 29 ends

(14) feet six (6) inches in height. b. Multi-Story Road Access Width. Fire apparatus access roadways serving buildings that are three (3) or more stories or thirty (30) feet or more in height shall be a minimum of thirty (30) feet in unobstructed width and vertically to fourteen (14) feet six (6) inches in height. One of the access points shall be an EVA located on the north west corner of the tract as shown on approved TTM.

44. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all -weather driving capabilities.

Road surface shall meet the approval of the Fire Chief prior to installation. All roads shall be designed to 85% compaction and/or paving and hold the weight of Fire apparatus at a minimum of 80K pounds.

45. Turnaround. An approved turnaround shall be provided at the end of each roadway one hundred and fifty (150) feet or more in length. Cul -de-sac length shall not exceed six hundred (600) feet; all roadways shall not exceed a 12% grade and have a minimum of forty-five (45) foot radius for all turns. In the Fire Safety Overlay District areas, there are additional requirements.

46. Prior to building permits being issued to any new structure, the primary access road shall be paved or an all -weather surface and shall be installed as specified in the General Requirement conditions including width, vertical clearance and turnouts.

47. Prior to building permits being issued to any new structure, the secondary access road shall be paved or an all -weather surface and shall be installed as specified in the General Requirement conditions including width, vertical clearance and turnouts.

48. A water system approved by the Fire Department is required. The system shall be operational prior to any combustibles being stored on the site. Detached single family residential developments may increase the spacing between hydrants to be no more than six hundred (600) feet and no more than three hundred (300) feet (as measured along vehicular travel-ways) from the driveway on the address side of the proposed single-family structure.

49. Please provide a fire flow test report from your water purveyor that has been completed in the last six months demonstrating that the fire flow demand is satisfied.

50. Prior to any land disturbance, the water systems shall be designed to meet the required fire flow for this development and shall be approved by the Fire Department. The required fire flow shall be determined by using California Fire Code. The Fire Flow for this project shall be: 2250 GPM for a two -hour duration at 20 psi residual operating pressure. Fire Flow is based on a 6700 sqrft. structure.

51. A water system approved by the Fire Department is required. The system shall be operational prior to any combustibles being stored on the site. Detached single family residential developments may increase the spacing between hydrants to be no more than six hundred (600) feet and no more than three hundred (300) feet (as measured along RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 26 of 29 ends

vehicular travel-ways) from the driveway on the address side of the proposed single-family structure.

52. Combustible vegetation shall be removed as follows: a. Where the average slope of the site is less than 15% -Combustible vegetation shall be removed a minimum distance of thirty (30) feet from all structures or to the property line, whichever is less. b. Where the average slope of the site is 15% or greater - Combustible vegetation shall be removed a minimum one hundred (100) feet from all structures or to the property line, whichever is less.

53. The applicant shall submit a fire lane plan to the Fire Department for review and approval.

Fire lane curbs shall be painted red. The "No Parking, Fire Lane" signs shall be installed on public/private roads in accordance with the approved plan.

54. This project is required to have an approved street sign (temporary or permanent). The street sign shall be installed on the nearest street corner to the project. Installation of the temporary sign shall be prior any combustible material being placed on th e construction site. Prior to final inspection and occupancy of the first structure, the permanent street sign shall be installed.

55. Blue reflective pavement markers indicating fire hydrant locations shall be installed as specified by the Fire Department. In areas where snow removal occurs or non-paved roads exist, the blue reflective hydrant marker shall be posted on an approved post along the side of the road, no more than three (3) feet from the hydrant and at least six (6) feet high above the adjacent road.

56. An automatic fire sprinkler system complying with NFPA Pamphlet #13, and the Fire Department standards is required. The applicant shall hire a Fire Department approved fire sprinkler contractor. The fire sprinkler contractor shall submit plans to the with hydraulic calculation and manufacturers specification sheets to the Fire Department for approval and approval. The contractor shall submit plans showing type of storage and use with the applicable protection system. The required fees shall be paid at the time of plan submittal.

57. The street address shall be installed on the building with numbers that are a minimum of four (4) inches in height and with a one half (½) inch stroke. The address shall be visible from the street. During the hours of darkness, the numbers shall be interna lly and electrically illuminated with a low voltage power source. Numbers shall contrast with their background and be legible from the street. Where the building is one hundred (100) feet or more from the roadway, the street address shall be displayed at the property entrances with numbers that are a minimum of four (4) inches in height and one half (½) inch stroke.

58. Where an automatic electric security gate is used, an approved Fire Department override switch (Knox ®) is required.

59. An approved spark arrestor is required. Every chimney that is used in conjunction with any fireplace or any heating appliance in which solid or liquid fuel are used, shall have an approved spark arrestor visible from the ground that is maintained in conformance with the California Fire Code.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 27 of 29 ends

60. Permission to occupy or use the building (certificate of Occupancy or shell release) will not be granted until the Fire Department inspects, approves, and signs off on the Building and Safety job card for “fire final”.

61. Fire Condition Letters shall expire on the date determined by the Planning Division or Building and Safety.

62. The County General Plan designates this property as being within the Fire Safety Review Area. All construction shall adhere to all applicable standards and requirements of the Fire Safety Review Area as adopted in the San Bernardino County Development Code.

63. A Fuel Modification Zone (FMZ) plan designed specifically for the subject project is required and shall be designed by a consultant approved by the Fire Department. The FMZ plan shall be submitted to the Fire Department for review and approval in compliance with County standards.

64. The applicant shall construct and maintain all such roads. In addition, the applicant shall provide to the Fire Department a signed maintenance agreement as detailed in the General Requirement conditions for ongoing road maintenance and snow removal (where applicable). This shall include all primary and secondary access routes that are not otherwise maintained by a public agency.

65. Where the natural grade between the access road and building is more than thirty percent (30%), an access road shall be provided within one hundred and fifty (150) feet of all buildings. Where such access cannot be provided, a fire protection system shall be installed. Plans shall be submitted to and approved by the Fire Department.

66. Fire access roadways shall not exceed a maximum of twelve (12%) percent grade at any point. Fire access roadways or driveways may be increased to fourteen (14%) percent grade for a distance not to exceed five hundred (500) feet. Fire access roadways providing access to no more than two (2) one or two -family dwellings may be increased to a maximum of sixteen (16%) percent grade not to exceed five hundred (500) feet. Grades across the width of a fire access roadway shall not exceed five (5%) percent.

67. In order to accommodate proper angles of approach and departure, gradient shall not exceed five (5%) percent change along any ten (10) foot section.

68. Roadways exceeding one hundred fifty (150) feet in length shall be approved by the Fire Department. Roadways shall be extended to within one hundred fifty (150) feet of and shall give reasonable access to all portions of the exterior walls of the first story of any building.

69. Each residential structure shall obtain a Residential Fire Letter form the County of San Bernardino County Fire protection District prior to any construction.

RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 28 of 29 ends

70. Any changes to the proposal shall require new Fire Department review and Condition Letter.

SECTION 6. The documents and materials associated with this Resolution constitute the record of proceedings on which these findings are based are located at 2 90 North D Street, San Bernardino, CA 92401. The City Clerk is the custodian of the record of proceedings.

SECTION 7. Notice of Determination: The Planning Division of the Community Development and Housing Department is hereby directed to file a Notice of Determination with the County Clerk of the Board of Supervisors of the County of San Bernardino within five (5) working days of final project approval certifying the City’s compliance with the California Environmental Quality Act in approving the Project.

SECTION 8. Severability: If any section, subsection, subdivision, sentence, or clause or phrase in this Resolution or any part thereof is for any reason held to be unconstitutional, invalid or ineffective by any court of competent jurisdiction, such decision shall not affect the validity or effectiveness of the remaining portions of this Resolution or any part thereof. The Mayor and City Council hereby declares that it would have adopted each section irrespective of the fact that any one or more subsections, subdivisions, sentences, clauses, or phrases be declared unconstitutional, invalid, or ineffective.

SECTION 9. Effective Date. This Resolution shall become effective immediately.

APPROVED and ADOPTED by the City Council and signed by the Mayor and attested by the City Clerk this 6th day of May, 2026.

Helen Tran, Mayor
City of San Bernardino

Attest:

Telicia Lopez, CMC, City Clerk

Approved as to form:

Sonia Carvalho, City Attorney
RESOLUTION NO. 2026-042
Resolution No. 2026-042
May 6, 2026

Page 29 of 29 ends

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO ) ss

CITY OF SAN BERNARDINO )

I, Telicia Lopez , CMC, City Clerk, hereby certify that the attached is a true copy of Resolution No. 202 6-042, adopted at a regular meeting held at the 6th day of May, 2026 by the following vote:

Council Members: AYES NAYS ABSTAIN ABSENT

SANCHEZ
IBARRA

FIGUEROA

SHORETT
KNAUS
FLORES
ORTIZ

WITNESS my hand and official seal of the City of San Bernardino this ___ day of _________, 2026.

Telicia Lopez, CMC, City Clerk

← All documents from this meeting