Attachment 2 - Bid Tabulation

Mayor and City Council
June 17, 2026

Document
Attachment 2 - Bid Tabulation
Meeting
June 17, 2026
Body
Mayor and City Council
Original file
190 KB
Text extracted from the city's file for reading and search. Open the original on sanbernardino.primegov.com. That file is the official record.

Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 MOBILIZATION 1.00 LS 40,000.00$ 40,000.00$ 57,420.00$ 57,420.00$ 51,471.00$ 51,471.00$ 80,000.00$ 80,000.00$ 68,000.00$ 68,000.00$ 30,000.00$ 30,000.00$ 2 TRAFFIC CONTROL 1.00 LS 30,000.00$ 30,000.00$ 35,400.00$ 35,400.00$ 83,525.00$ 83,525.00$ 20,000.00$ 20,000.00$ 15,000.00$ 15,000.00$ 10,000.00$ 10,000.00$ 3 CLEARING, GRUBBING AND BMPS 1.00 LS 10,000.00$ 10,000.00$ 21,469.50$ 21,469.50$ 8,715.00$ 8,715.00$ 35,000.00$ 35,000.00$ 15,000.00$ 15,000.00$ 20,000.00$ 20,000.00$ 4 INSTALL 18' RCP (D=LOAD=2,000) 1180.00 LF 152.50$ 179,950.00$ 156.00$ 184,080.00$ 191.00$ 225,380.00$ 210.00$ 247,800.00$ 323.00$ 381,140.00$ 295.00$ 348,100.00$ 5 CONSTRUCT CURB INLET CATCH BASIN No.1 per CITY OF SAN BERNARDINO STD DWG NO. 403 1.00 EA 6,000.00$ 6,000.00$ 9,360.00$ 9,360.00$ 9,071.00$ 9,071.00$ 14,600.00$ 14,600.00$ 7,000.00$ 7,000.00$ 11,000.00$ 11,000.00$ 6 CONSTRUCT CURB INLET CATCH BASIN No.1 per CITY OF SAN BERNARDINO STD DWG NO. 404 1.00 EA 6,000.00$ 6,000.00$ 10,200.00$ 10,200.00$ 9,071.00$ 9,071.00$ 14,800.00$ 14,800.00$ 7,000.00$ 7,000.00$ 15,000.00$ 15,000.00$ 7 CONSTRUCT LOCAL DEPRESSION per CITY OF SAN BERNARDINO STD DWG NO. 407 2.00 EA 3,000.00$ 6,000.00$ 3,480.00$ 6,960.00$ 2,568.00$ 5,136.00$ 5,860.00$ 11,720.00$ 2,600.00$ 5,200.00$ 4,000.00$ 8,000.00$ 8 CONSTRUCT CONNECTION TO CATCH BASIN per CITY OF SAN BERNARDINO STD DWG NO. 416 1.00 EA 3,000.00$ 3,000.00$ 4,920.00$ 4,920.00$ 9,387.00$ 9,387.00$ 500.00$ 500.00$ 500.00$ 500.00$ 6,500.00$ 6,500.00$ 9 INSTALL 24" X 24" CONCRETE DROP INLET PER BROOKS BOX 1.00 EA 2,000.00$ 2,000.00$ 7,080.00$ 7,080.00$ 3,399.00$ 3,399.00$ 8,500.00$ 8,500.00$ 5,000.00$ 5,000.00$ 10,000.00$ 10,000.00$ 10 INSTALL CHAIN LINK FENCE PER CALTRANS STD NO. A85 20.00 LF 200.00$ 4,000.00$ 132.00$ 2,640.00$ 217.00$ 4,340.00$ 150.00$ 3,000.00$ 115.00$ 2,300.00$ 200.00$ 4,000.00$ 11 CONSTRUCT WING-TYPE HEADWALL PER COUNTY OF SAN BERNANARDINO STD. NO. 209 1.00 EA 13,000.00$ 13,000.00$ 10,260.00$ 10,260.00$ 17,463.00$ 17,463.00$ 8,700.00$ 8,700.00$ 18,000.00$ 18,000.00$ 17,000.00$ 17,000.00$ 12 INSTALL GROUTED STONE OUTLET PAD PER S.B. FLOOD CONTROL DISTRICT STD PLAT S.P. PLAT 195-A 35.00 SF 40.00$ 1,400.00$ 90.00$ 3,150.00$ 311.00$ 10,885.00$ 120.00$ 4,200.00$ 100.00$ 3,500.00$ 230.00$ 8,050.00$ 13 CONSTRUCT MANHOLE NO. 2 per CITY OF S.B. STD NO.415AND STD 304 FOR MANHOLE COVER 4.00 EA 8,000.00$ 32,000.00$ 10,560.00$ 42,240.00$ 13,563.00$ 54,252.00$ 11450.00 45,800.00$ 7,500.00$ 30,000.00$ 12,000.00$ 48,000.00$ 14 REMOVE EXISTING ASPLALT PAVEMENT SECTION 6250.00 SF 3.00$ 18,750.00$ 5.64$ 35,250.00$ 2.00$ 12,500.00$ 3.00$ 18,750.00$ 3.50$ 21,875.00$ 3.00$ 18,750.00$ 15 INSTALL MINIMUM PAVEMENT REPAIR per CITY OF S.B. STD DWG NO. 310 TREACH SPECIFICATIONS 6250.00 SF 7.00$ 43,750.00$ 11.88$ 74,250.00$ 8.00$ 50,000.00$ 9.00$ 56,250.00$ 8.00$ 50,000.00$ 7.00$ 43,750.00$ 16 REMOVE AND REPLACE EXISITING CONCRETE OVER 95% COMPACTION TO MATCH EXISTING(6" THICK MIN) 30.00 CY 300.00$ 9,000.00$ 720.00$ 21,600.00$ 545.00$ 16,350.00$ 1,000.00$ 30,000.00$ 1,000.00$ 30,000.00$ 2,000.00$ 60,000.00$ 17 REMOVE AND REPLACE EXISITING GROUTED RIP-RAP OVER 95% COMPACTION TO MATCH EXISTING 260.00 SF 100.00$ 26,000.00$ 13.20$ 3,432.00$ 71.00$ 18,460.00$ 22.00$ 5,720.00$ 40.00$ 10,400.00$ 50.00$ 13,000.00$ 18 REMOVE EXISITING CURB AND REPLACE WITH 6" CURB PER CITY STD DWG NO. 200 TO MATCH EXISITING 40.00 LF 100.00$ 4,000.00$ 99.00$ 3,960.00$ 357.00$ 14,280.00$ 161.00$ 6,440.00$ 42.00$ 1,680.00$ 100.00$ 4,000.00$ 19 REMOVE EXIST.SIDEWALK AND REPLACE WITH 0.3' PCC SIDWALK PER CITY STD DWG NO. 202 TO EXIST. 250.00 SF 14.00$ 3,500.00$ 19.80$ 4,950.00$ 32.00$ 8,000.00$ 30.00$ 7,500.00$ 25.00$ 6,250.00$ 25.00$ 6,250.00$ 20 REMOVE EXISTING CONCRETE AND REPLACE WITH 8" CONCRETE CROSS 1.50 CY 1,000.00$ 1,500.00$ 495.00$ 742.50$ 2,431.00$ 3,646.50$ 3,600.00$ 5,400.00$ 1,800.00$ 2,700.00$ 2,000.00$ 3,000.00$ 21 INSTALL 24" RCP (D-LOAD+2,000) 85.00 LF 300.00$ 25,500.00$ 237.60$ 20,196.00$ 231.00$ 19,635.00$ 344.00$ 29,240.00$ 340.00$ 28,900.00$ 355.00$ 30,175.00$ 22 23
24 25
26 27
28 29
30 31
32 Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
Apparent Low
Bidder 4
Apparent Low
Bidder 5
Apparent Low
Bidder 6
$465,350.00 $559,560.00 $634,966.50 $653,920.00 $709,445.00 $714,575.00 $465,350.00 $559,560.00 $634,966.50 $653,920.00 $709,445.00 $714,575.00 A1. UTILITY STANDBY TIME (PER THE CITY) 1.00 MONTH 30,000.00$ 30,000.00$ 14,640.00$ 14,640.00$ -$ -$ 50,400.00$ 50,400.00$ 17,020.00$ 17,020.00$ 15,000.00$ 15,000.00$ 30,000.00$ 14,640.00$ -$ 50,400.00$ 17,020.00$ 15,000.00$ $495,350.00 $574,200.00 634,966.50$ $704,320.00 726,465.00$ 729,575.00$ TOTAL TOTAL $0.00 TOTAL $0.00 TOTAL $0.00 TOTAL $0.00 TOTAL

1. BID TABULATION
PROJECT NAME: W. HILL DR STORM DRAIN IMPROVEMENTS
PROJECT NO: 13649

BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
LEONIDA BUILDERS, INC. ESTATE DESIGN AND
CONSTRUCTION, INC. VOLTAIRE ENGINEERING, INC. WRIGHT CONSTRUCTION

ENGINEERING

DOMINGUEZ GENERAL

ENGINEERING
Apparent Low Bidder 3

BOUDREAU PIPELINE

CONSTRUCTION

BID ITEM & DESCRIPTION

BID RANKING

ADDITIVE
Apparent Low Bidder 4 Apparent Low Bidder 5 Apparent Low Bidder 6

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

TOTAL BID AMOUNT INDICATED BY BIDDER

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT

SUBCONTRACTORS
SUBCONTRACTOR % AND AMOUNT SHOWN IN THE BID
DID THE BIDDER MEET MAX 49% SUB CONTRACTOR (MIN 51% WORK BY PRIME CONTRACTOR) REQUIREMENT

ADDITIVE TOTAL
BASE BID + ADDITIVE TOTAL

IS THE BIDDER QUALIFIED BASED ON REFERENCE PROJECTS
C:\Users\Alvarado_VA\Downloads\Attachment 2 - Bid Tabulation (1)BID TABULATION 1 of 1