Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 MOBILIZATION / CLEARING AND GRUBBING 1 LS 783,000.00$ 783,000.00$ 306,000.00$ 306,000.00$ 420,000.00$ 420,000.00$ 750,000.00$ 750,000.00$ 470,000.00$ 470,000.00$ 2 TRAFFIC CONTROL 1 LS 513,000.00$ 513,000.00$ 240,000.00$ 240,000.00$ 615,000.00$ 615,000.00$ 900,000.00$ 900,000.00$ 105,283.00$ 105,283.00$ 3 STORM WATER POLLUTION AND PREVENTATION PLAN AND NPDES COMPLIANCE 1 LS 63,000.00$ 63,000.00$ 115,500.00$ 115,500.00$ 18,000.00$ 18,000.00$ 45,000.00$ 45,000.00$ 1,800.00$ 1,800.00$ 4 SAWCUT & REMOVE & CONSTRUCT PCC CURB & GUTTER PER CITY OF SAN BERNARDINO STANDARD 200, TYPE B TO MATCH EXISITING; MILL ALL CURB CUTS 300 LF 84.00$ 25,200.00$ 8.00$ 23,400.00$ 90.00$ 27,000.00$ 112.00$ 33,600.00$ 122.00$ 36,600.00$ 5 SAWCUT & REMOVE & CONSTRUCT PCC CURB PER CITY OF SAN BERNARDINO STANDARD 200, TYPE A TO MATCH EXISITING; MILL ALL CURB CUTS 600 LF 75.00$ 45,000.00$ 45.00$ 27,000.00$ 72.00$ 43,200.00$ 90.00$ 54,000.00$ 74.00$ 44,400.00$ 6 SAWCUT & REMOVE & CONSTRUCT PCC CURB ACCESS RAMP WITH 3'X4' CAST-IN-PLACE TRUNCATED DOME SURFACE, MIN 5' TRANSITION PPANELS, CURB & CUTTER AND AC SLOT PATCH PER SPPWC 111- 5 50 EA
6,000.00$ 300,000.00$ 5,400.00$ 270,000.00$ 8,700.00$ 435,000.00$ 6,300.00$ 315,000.00$ 5,700.00$ 285,000.00$ 7 SAWCUT & REMOVE & CONSTRUCT PCC CURB ACCESS RAMP WITH 3'X4' CAST-IN-PLACE TRUNCATED DOME SURFACE, MIN 5' TRANSITION PPANELS, CURB & CUTTER, PCC SPANDREL, AND AC SLOT PATCH PER SPPWC 111-5
25 EA
8,400.00$ 210,000.00$ 17,225.00$ 430,625.00$ 14,700.00$ 367,500.00$ 7,300.00$ 182,500.00$ 15,000.00$ 375,000.00$ 8 SAWCUT & REMOVE & CONSTRUCT PCC CUR ACCESS RAMP ABOVE CULVERT WITH 3'X4' CAST-IN- PLACE TRUNCATED DOME SURFACE, MIN 5' TRANSITION PANELS, CURB & GUTTER AND AC SLOT PLATCH PER SPPWC 111-5
10 EA
7,500.00$ 75,000.00$ 7,800.00$ 78,000.00$ 11,100.00$ 111,000.00$ 7,300.00$ 73,000.00$ 4,000.00$ 40,000.00$ 9 SAWCUT & REMOVE & CONSTRUCT PCC SIDEWALK, BYPASS AND/OR TRANSITION PANEL OVER SUBGRADE COMPACTED TO 95% RELATIVE COMPACTION PER CITY OF SAN BERNARDINO STANDARD 202; MILL ALL CURB CUTS
7,000 SF

13.30$ 93,100.00$ 16.00$ 112,000.00$ 14.00$ 98,000.00$ 20.00$ 140,000.00$ 21.00$ 147,000.00$ 10 SAWCUT & REMOVE & CONSTRUCT 8" PCC CROSS GUTTER OVER SUBGRADE PER CITY OF SAN BERNARDINO STANDARD NO. 201; MILL ALL CURB CUTS 700 SF 34.00$ 23,800.00$ 70.00$ 49,000.00$ 40.00$ 28,000.00$ 30.00$ 21,000.00$ 39.00$ 27,300.00$ 11 FULL DEPTH REMOVAL OF EXISITING ASPHALT ROADWAY AS DIRECTED BY THE ENINGEER - FULL STREET WIDTH 21,000 CY 28.00$ 588,000.00$ 32.00$ 672,000.00$ 49.00$ 1,029,000.00$ 34.00$ 714,000.00$ 31.00$ 651,000.00$ 12 EXCAVATE NATIVE SUBGRADE / BASE IN ROADWAY AS DIRECTED BY THE ENGINEER - FULL STREET WIDTH 19,000 CY 44.00$ 836,000.00$ 34.00$ 646,000.00$ 64.00$ 1,216,000.00$ 62.00$ 1,178,000.00$ 50.00$ 950,000.00$ 13 ADJUST UTILITY MANHOLES COVER TO GRADE 52 EA 1,670.00$ 86,840.00$ 1,655.00$ 86,060.00$ 2,080.00$ 108,160.00$ 3,000.00$ 156,000.00$ 1,625.00$ 84,500.00$ 14 FURNISH, INSTALL, AND COMPLETE PLACING AND COMPACTING OF CLASS II BASE OVER SUBGRADE; COMPACTED TO 95% 16,000 CY 52.50$ 840,000.00$ 98.00$ 1,568,000.00$ 57.00$ 912,000.00$ 60.00$ 960,000.00$ 118.00$ 1,888,000.00$ 15 AC OVERLAY PER PROJECT SPECIFICATIONS 47,000 TN 90.00$ 4,230,000.00$ 101.00$ 4,747,000.00$ 109.00$ 5,123,000.00$ 117.00$ 5,499,000.00$ 139.00$ 6,533,000.00$ 16 REPLACE EXISITING TRAFFIC LOOP DECTOR COMPLETE IN PLACE PER CALTRANS STANDARD E-5B, AND PROJECT SPECIFICATIONS 40 EA 640.00$ 25,600.00$ 670.00$ 26,800.00$ 725.00$ 29,000.00$ 550.00$ 22,000.00$ 1,105.00$ 44,200.00$ 17 INSTALL THERMOPLASTIC TRAFFIC STRIPING, SIGNAGE, PAVEMENT MESSAGES, PAVEMENT

MARKING, CONTINENTAL STYLE CROSSWALKS AND GLUE DOWN RPM'S COMPETE IN PLACE PER CALTRANS STANDARD A20A, A20B, A24E AND SPECIFICATIONS
1 LS
158,000.00$ 158,000.00$ 157,300.00$ 157,300.00$ 158,000.00$ 158,000.00$ 160,000.00$ 160,000.00$ 154,545.00$ 154,545.00$ 18 REMOVE AND DISPOSE POLES, FOUNDATIONS AND SIGNS AND ALL ATTACHED EQUIPMENT 1 LS 3,600.00$ 3,600.00$ 10,300.00$ 10,300.00$ 3,570.00$ 3,570.00$ 4,000.00$ 4,000.00$ 3,000.00$ 3,000.00$ 19 FURNISH AND INSTALL RECTANGULAR RAPID FLASHING BEACON (RRFB) SYSTEM WITH ADVANCED FLASHERS (TWO FLASHERS AT THE CROSSWALK WITH TWO FLASHERS IN ADVANCE) 2 EA 39,000.00$ 78,000.00$ 50,000.00$ 100,000.00$ 39,000.00$ 78,000.00$ 75,000.00$ 150,000.00$ 25,833.00$ 51,666.00$ 20 FURNISH AND INSTALL SOLAR-POWERED ADVANCE FLASHING BEACON WITH SIGNAGE W3-3, INCLUDING REMOVAL AND DISPOSAL OF EXISITING SIGN ASSEMLIES, COMPLETE AND IN PLACE 2 EA 11,400.00$ 22,800.00$ 10,100.00$ 20,200.00$ 11,300.00$ 22,600.00$ 15,000.00$ 30,000.00$ 5,393.00$ 10,786.00$ 21 PROJECT CONSTRUCTION SIGNS PER ACTIVE CONSTRUCTION LOCATION 2 EA 3,050.00$ 6,100.00$ 1,225.00$ 2,450.00$ 2,680.00$ 5,360.00$ 10,000.00$ 20,000.00$ 1,300.00$ 2,600.00$ 22 FURNISH AND INSTALL NEW TRAFFIC SIGNAL CONDUIT AT THE SPECIFIED LOCATIONS 260 LF 62.00$ 16,120.00$ 145.00$ 37,700.00$ 61.00$ 15,860.00$ 90.00$ 23,400.00$ 167.00$ 43,420.00$ 23 FURNISH AND INSTALL PULL BOXES (TYPE 5 OR 6) WIT PENTA-HEAD BOLTS AT THE SPECIFIED LOCATIONS 5 EA 1,330.00$ 6,650.00$ 2,500.00$ 12,500.00$ 1,320.00$ 6,600.00$ 1,000.00$ 5,000.00$ 1,780.00$ 8,900.00$ Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
Apparent Low
Bidder 4
Apparent Low
Bidder 5
$9,028,810.00 $9,737,835.00 $10,869,850.00 $11,435,500.00 $11,958,000.00 $9,028,810.00 $9,739,035.00 $10,869,850.00 $11,435,500.00 $11,958,000.00 $0.00 -$1,200.00 $0.00 $0.00 $0.00
A1. UTILITY STANDBY TIME (PER THE CITY) 1 MONTH 8,500.00$ 8,500.00$ 2,750.00$ 2,750.00$ 10,000.00$ 10,000.00$ 64,932.00$ 64,932.00$ 70,000.00$ 70,000.00$ 1 LS 47,000.00$ 47,000.00$ 56,700.00$ 56,700.00$ 48,000.00$ 48,000.00$ 60,000.00$ 60,000.00$ 65,000.00$ 65,000.00$ 180 LF 205.00$ 36,900.00$ 145.00$ 26,100.00$ 400.00$ 72,000.00$ 250.00$ 45,000.00$ 460.00$ 82,800.00$ 92,400.00$ 85,550.00$ 130,000.00$ 169,932.00$ 217,800.00$ $9,121,210.00 $9,823,385.00 10,999,850.00$ 11,605,432.00$ 12,175,800.00$

12.82% $1,169,710.00
TOTAL TOTAL $0.00 TOTAL $0.00 TOTAL $0.00

SUBCONTRACTORS
SUBCONTRACTOR % AND AMOUNT SHOWN IN THE BID
DID THE BIDDER MEET MAX 49% SUB CONTRACTOR (MIN 51% WORK BY PRIME CONTRACTOR) REQUIREMENT Yes BASE BID + ADDITIVE TOTAL
IS THE BIDDER QUALIFIED BASED ON REFERENCE PROJECTS Yes

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

TOTAL BID AMOUNT INDICATED BY BIDDER

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT

ADDITIVE

ADDITIVE TOTAL

BID ITEM & DESCRIPTION

BID RANKING

MATICH CORPORATION CALMEX ENGINEERING, INC ALL AMERICAN ASPHALT GRANITE CONSTRUCTION

COMPANY
Apparent Low Bidder 4

SEQUEL CONSTRUCTION
Apparent Low Bidder 3 Apparent Low Bidder 5

1. BID TABULATION
PROJECT NAME: PAVEMENT REHABILITATION AT SIX MAJOR LOCATIONS PROJECT NO: 13682

BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
C:\Users\Alvarado_VA\Downloads\Attachment 3 - Bid Tabulation (3)BID TABULATION (2) 1 of 1