was to release the artist call with an adjustment to the maximum artist compensation from $75,000 to $65,000.

Commissioners Hanhan and Seymour were selected to serve on the jury panel. Commissioner Seymour recommended artist Martha Diaz as a juror. Additional jurors secured by staff included Donald Gensler, Art in Public Places Manager for the City of Sacramento, and Amber Evans, manager of the City of Emeryville’s Public Art Program.

The artist call was released on March 27, 2026, and closed on May 11, 2026. Of the 34 proposals received by the deadline, 18 were found to be complete according to the published submission requirements.

On June 3, 2026, the jury panel met to review and discuss the 18 complete proposals and present their scoring to determine the top 10 proposals that would advance to public review (Attachment 2).

The public survey was conducted June 8-July 4, 2026. Voting was hosted online through a Microsoft Forms survey on the City’s website. Staff promoted the voting opportunity through multiple channels in addition to the website including, Community Services newsletters, flyers posted at Community Services facilities, social media platforms such as Facebook and Instagram, and outreach at various special events during the voting period. Attachment 3 illustrates the jury panel scoring results alongside the public voting results.

At the July 16, 2026, Culture and Arts Commission meeting, commissioners reviewed the jury panel’s scoring and the public survey results for the top 10 mural proposals. Additionally, mural artists Vincent Concepcion, Anne-Sophie Gaudet, and Mershon Menard spoke during public comment about their proposals.

Following deliberation, the commission voted to recommend that the City Council approve the proposed mural as presented in the application by artist Jesse Melanson entitled “Blooming Together”. The recommendation reflects the Commission's determination that the proposal is consistent with the City’s Mural Program as well as the published artist call and meets all necessary criteria for the installation of a mural at the chosen location facing Centennial Plaza.

FISCAL IMPACT:

The Fiscal Impact of this item is an artist fee in the amount of $65,000. Any future maintenance costs, which are expected to be minor, would be addressed by the City in accordance with the terms of the easement and artist agreements.

ENVIRONMENTAL IMPACT:

The action is not a project subject to CEQA. City Council’s action is not considered a “Project” per CEQA Guidelines and therefore no further environmental analysis is required.

RECOMMENDATION:

Approve the recommendation from the Culture and Arts Commission to install a mural at 474 San Mateo Avenue facing Centennial Plaza, and authorize the City Manager to negotiate and

139 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 3 of 3 ends

execute, in conjunction with the City Attorney, an easement agreement with 474 San Mateo Avenue property owner Vikas Sharma, and an artist agreement with muralist Jesse Melanson.

ALTERNATIVES:

1. Approve an alternate mural from the proposals.

2. Do not approve the recommended action, resulting in no mural at Centennial Plaza.

ATTACHMENTS:

1. Resolution

2. Top 10 Mural Proposals

3. Jury Panel Scoring and Public Survey Results

140 of 336

1 RESOLUTION NO. 2026 - ___

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN BRUNO APPROVING THE

RECOMMENDATION FROM THE CULTURE AND ARTS COMMISSION TO INSTALL A MURAL AT 474 SAN MATEO AVENUE FACING CENTENNIAL PLAZA
WHEREAS, on October 14, 2025, the City Council approved the establishment of a Mural Program to provide a clear and consistent process for proposing, reviewing, installing, and maintaining murals on both City-owned and private property; and WHEREAS, on December 9, 2025, the City Council authorized funding from the City Art Fund not to exceed $75,000 for the Centennial Plaza mural project, and the recommended mural proposal includes an artist fee of $65,000; and
WHEREAS, the south-facing wall of the privately owned building at 474 San Mateo Avenue has been identified as a desirable location for a mural due to its high visibility from Centennial Plaza and its importance as a defining element of the plaza’s public space; and WHEREAS, the property owner of 474 San Mateo Avenue, Vikas Sharma, has provided verbal consent for the installation of the mural and has agreed to enter into a mural easement with the City, consistent with the requirements of the Mural Program; and WHEREAS, City staff collaborated with the property owner to make improvements to the wall to prepare it for a future mural installation and to support the overall design vision for Centennial Plaza; and
WHEREAS, the proposed mural is intended to reflect the character, culture, and values of San Bruno and enhance Centennial Plaza as a high-visibility downtown space used for community events and cultural celebrations; and
WHEREAS, on July 16, 2026, the Culture and Arts Commission voted to recommend that the City Council approve a mural proposal submitted by muralist Jesse Melanson; and WHEREAS, the City Council has reviewed the mural proposal, supporting documentation, and the recommendation of the Culture and Arts Commission.

NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of San Bruno hereby approves the recommendation from the Culture and Arts Commission for the installation of a mural at 474 San Mateo Avenue facing Centennial Plaza, and authorizes the City Manager, in conjunction with the City Attorney, to negotiate and execute an easement agreement with Vikas Sharma, property owner of 474 San Mateo Avenue, and an artist agreement with muralist Jesse Melanson. ---oOo---
I hereby certify that foregoing Resolution No. 2026 – ___ was introduced and adopted by the San Bruno City Council at a regular meeting on August 25, 2026, by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:
_________________________________
Lupita Huerta, City Clerk
141 of 336 ATTACHMENT 1
142 of 336
ATTACHMENT 2
Concept Narrative
San Bruno Centennial Plaza Mural
JMEL Art | Jesse Melanson
Blooming Together envisions Centennial Plaza as an imaginative celebration of community, movement, creativity, and connection — transformed into a vibrant world where oversized native-inspired plant life, color, and human activity merge into one dynamic environment. Drawing inspiration from San Bruno’s role as both a connected urban hub and gateway to nature, the mural reflects the city’s energy, diversity, and sense of possibility through a bold geometric visual language.

The scene invites viewers into a whimsical landscape where community members move through and interact within a larger-than-life floral environment. Cyclists, hikers, musicians, dancers, and families represent the many ways people gather, explore, celebrate, and connect throughout San Bruno’s public spaces. The train and airplane subtly reference the city’s relationship to movement, transit, and regional connectivity, while the open plaza structure symbolizes gathering, performance, and shared cultural experiences.

Each vignette along the bottom of the proposal highlights a core theme embedded throughout the composition — including active transportation, play, exploration, connection, generosity, celebration, and growth. Together, these moments create a layered visual narrative that reflects Centennial Plaza not simply as a destination, but as a living social space where culture, nature, imagination, and community continuously intersect and evolve.

Through bold color, abstract geometry, and immersive scale, the mural aims to create an uplifting and memorable landmark that celebrates San Bruno’s identity while encouraging joy, curiosity, and human connection.
www.jmelart.com

143 of 336

Artist Statement

San Bruno Centennial Plaza Mural

JMEL Art | Jesse Melanson

I am interested in this project because Centennial Plaza represents the type of public space I most enjoy creating for — a highly visible community gathering place centered around connection, movement, culture, and shared experience. My goal with public art is to create work that feels integrated into the identity and energy of a space while also encouraging curiosity, joy, and interaction from the people who experience it daily.

My approach to community and public art is rooted in site-specific storytelling. I draw inspiration from the surrounding environment, local culture, architecture, ecology, and the ways people naturally move through and use a space. Rather than applying the same visual solution to every wall, I aim to create artwork that responds uniquely to each location and reflects the character of the community it belongs to.

My work is known for its bold geometric style, vibrant color palettes, and large-scale immersive compositions. I primarily work with artist-grade MTN 94 aerosol paints and exterior mural paints, often combining geometric abstraction with recognizable environmental and cultural elements. My process typically includes research, conversations and listening, concept development, revisions informed by community feedback, digital rendering, surface preparation, large-scale mural execution, and protective clear coating systems including MuralShield and anti-graffiti coatings for long-term durability and maintenance.

I work independently as the lead artist and oversee all aspects of design, project coordination, and mural execution. Depending on finalized project scale, details and schedule, I may also work with a small support team assisting with production and installation.
www.jmelart.com

144 of 336

Collaborative Experience Statement & Past Work
Throughout my career, I have collaborated with a wide range of municipalities, community organizations, developers, schools, architects and design professionals on large-scale mural and public art projects across the United States. My experience includes working with downtown development agencies, municipal arts and cultural organizations, redevelopment groups, public schools, colleges, private developers, and commercial property teams to create site-specific public artwork that reflects the identity and character of each location.

My role on these projects has always been as lead artist, overseeing concept development, community engagement, project coordination, design refinement, surface preparation, material selection, mural execution, and final protective coating application. Many of my projects are large-scale outdoor works requiring coordination around active public spaces, specialized safety measures, construction schedules, accessibility considerations, lift operations, and long-term durability planning.

My approach emphasizes communication, safety, adaptability, and creating artwork that responds directly to the surrounding architecture, environment, and community. I value collaboration as an essential part of the public art process and aim to create work that not only enhances a space visually, but also strengthens community identity and public space engagement.

145 of 336

Title: Transcendence
Dimensions: 137’ W x 24’ H
Client: Downtown Improvement
Association of Hobbs New Mexico
Location: Hobbs, NM
Year: 2025
Materials: Masonry Primer, Spray Paint,
MuralShield on Brick
Timeline: 15 days
Process & Information:

Transcendence is about rising beyond the
ordinary—honoring heritage while
looking toward what’s possible. Painted
in downtown Hobbs, NM, the mural
blends cultural and natural history into a
vibrant, forward-looking narrative. A
praying woman anchors the piece,
framed by a sun inspired by the Zia
symbol, while a jaguar from Mexican
folklore represents the land and an eagle
—reflecting the local high school mascot
—symbolizes freedom and aspiration.

Butterflies embody transformation and
migration, two cowboys pay tribute to
Hobbs’ western legacy, and prickly pear
cacti with blooming roses ground the
work in resilience, growth, and renewal.

Together, these elements form a portrait
of Hobbs—rooted in its past and full of
hope for the future of their downtown.

Reference Contact:

Lorena Chavarria
Executive Director, Downtown Improvement
Association of Hobbs
| www.jmelart.com
Transcendence | Hobbs, New Mexico 2025

146 of 336

Title: The Lion of Anacostia
Dimensions: 35’ W x 22’ H
Client: MuralsDC
Location: Anacostia, Washington DC
Year: 2024
Materials: Spray Paint on Stucco
Timeline: 5 days
Process & Information:

The Lion of Anacostia was painted in the
historic Anacostia neighborhood of
Washington, D.C., inspired by Frederick
Douglass—known as the “Lion of
Anacostia.” The lion represents his
strength, resilience, and enduring legacy
as a leader in the fight for African-
American civil rights. Its gaze toward a
gold-framed portal symbolizes a bright,
forward-looking future, while the
swirling, colorful clouds reflect the
neighborhood’s ongoing evolution.

Just blocks from Douglass’s estate, this
mural honors his influence and celebrates
Anacostia’s vibrant culture. Created in
partnership with @anacostiabid,
@arttogogo, and @muralsdc, it is part of
the growing public art presence within
D.C.’s designated Arts and Culture
District.

Reference Contact
Ashley Templeton
Marketing and Arts & Culture Program Manager The Lion of Anacostia | Anacostia Washington DC | www.jmelart.com
2024

147 of 336

Title: Cub’s First View
Dimensions: 28’ W x 23’ H
Client: Visit RENO
Location: Reno Sparks Convention Center
Reno, NV
Year: 2024
Materials: Spray Paint on Sheetrock
Timeline: 7 days
Video Link: CLICK HERE
Process & Information:

Cub’s First View is a vibrant low-polygon
mural celebrating the Reno-Tahoe region
through the story of a mother bear and
her cub overlooking Lake Tahoe. The
piece highlights the area’s iconic wildlife
and landscape, blending colorful
mountains, a radiant sun, and the
region’s dynamic scenery into a unified,
emotional narrative about connection,
wonder, and the natural beauty of Reno-
Tahoe.

Reference Contact
Courtney Mann
Reno-Sparks Convention & Visitors Authority
| www.jmelart.com
Cub’s First View | Reno, Nevada 2024

148 of 336

Title: Morning Glow
Dimensions: 53’ W x 17’ H
Client: PARADE + Greystar @Anthem
Location: Everett, MA
Year: 2024
Materials: Spray Paint on Stucco
Timeline: 7 days
Process & Information:

Located inside the communal courtyard
of the Anthem apartment community in
Everett MA, this large mural creates a
peaceful visual pathway through a coastal
New England landscape. The design
blends rocky shoreline, a guiding
lighthouse, and a vibrant forest scene to
bring a sense of calm, movement, and
natural rhythm to the shared outdoor
space. Integrated directly into the
architecture, the mural enhances the
courtyard’s atmosphere and provides
residents with an immersive, uplifting
environment.

Reference Contact:

Jake Millett
Curator | PARADE ART
| www.jmelart.com
Desert Bighorn | Carson City, Nevada 2023

149 of 336

Title: Thunderbird
Dimensions: 74’ x 13’
Client: Downtown Improvement
Association of Hobbs New Mexico (DIA)
Location: Hobbs, NM
Year: 2025
Materials: Spray Paint, Mural Shield on
Stucco
Timeline: 5 days
Process & Information:

Painted as part of the Hobbs first annual
mural festival this piece titled
Thunderbird draws inspiration from the
powerful figure in Southwestern and
Indigenous mythology — a symbol of
strength, protection, and transformation.

The eagle rises from a storm of fire and
light — more than a bird, it’s the spirit
and story of power and rebirth.

This mural is a tribute to the resilience
and beauty of this region and to the
people of Hobbs who continue to bring
creativity and culture into their
community and the transformation of
downtown.

Reference Contact:

Lorena Chavarria
Executive Director, Downtown Improvement
Association of Hobbs
| www.jmelart.com
Thunderbird | Hobbs, New Mexico 2025

150 of 336

Title: Adirondack Balloons
Dimensions: 100’ x 50’
Client: Glens Falls Arts District
Location: Glens Falls, NY
Year: 2022
Materials: Spray Paint, Masonry Primer,
Mural Shield on Brick
Timeline: 12 days
Process & Information:

Designed through collaboration and
conversations with the Glens Falls Arts
District and the Glens Falls community,
Adirondack Balloons was created
and installed in the main fairway traffic
circle in downtown Glens Falls, NY . Glens
Falls serves as the gateway to the
majestic Adirondack Mountains, a
region teeming with natural beauty,
energy, and life.

The hot air balloons in the mural
symbolize the city's annual Hot Air
Balloon Festival, a cherished tradition
that has become an integral part of the
community's culture and identity. This
artwork celebrates both the festival and
the vibrant spirit of Glens Falls, honoring
the connection between its
people and the awe-inspiring landscape
that surrounds them.

Reference Contact:

Chad Rabinovitz | Glens Falls Arts District
| www.jmelart.com
Adirondack Balloons | Glens Falls, New York 2025

151 of 336

Title: Flowering JADE
Dimensions: Varies
Client: Greystar
Location: Everett, MA
Year: 2025
Materials: Acrylic Latex, MuralShield
Timeline: 3 days
Process & Information:

Flowering JADE uses unfolding geometric
forms and layered green gradients to
symbolize growth, renewal, and the
steady upward movement of a healthy
community. Inspired by the Jade brand’s
emphasis on vitality and natural
harmony, the design integrates
seamlessly with the building’s
architecture, creating a calm, uplifting
rhythm across the panels.

At the center, a stylized sprout rises from
the base of the composihon, echoing
themes of care, resilience, and new
beginnings. The result is a refined,
contemporary artwork that enhances the
environment with clarity, ophmism, and a
sense of conhnual transformahon.

Reference Contact:

Timothy Beinert
Director, Development | Greystar
| www.jmelart.com
Flowering JADE | Everett, MA 2025
Mural Detail

152 of 336

Title: Spirit in the Sky
Dimensions: 45’ x 65’
Client: Malden Arts
Location: Malden, MA
Year: 2019
Materials: Masonry Primer, Bucket Paint
on Brick
Timeline: 11 days
Process & Information:

Spirit in the Sky is a mural painted in
Malden, MA to honor Norman
Greenbaun, who wrote the hit song
“Spirit in the Sky” and is from Malden,
MA.

The mural was designed as a vibrant and
iconic piece of artwork for the City of
Malden with a goal to fuel economic
growth through Cultural Value,
Educational Value, Historic Value and
Community Engagement. Norman
Greenbaun even came to the ribbon
cutting event and did a musical
performance Spirit in the Sky at the base
of the mural followed by a community
celebration at the nearby community
center.

Reference Contact:

Naomi Brave
Malden Arts President
| www.jmelart.com
Spirit in the Sky | Malden, Massachusetts 2025

153 of 336

Title: A Valley of Color
Dimensions: 700 + square feet
Client: Development and Revitalization
Team (DART) of Montrose
Location: Montrose, CO
Year: 2025
Materials: Masonry Primer, Spray Paint,
Mural Shield on Brick
Timeline: 6 days
Video Link: CLICK HERE
Process & Information:

A Valley of Color celebrates the native
wildflowers, pollinators, and energy of
Montrose, Colorado. The mural brings
new life to an overlooked space,
reflecting the beauty and spirit of
Western Colorado and the community it
represents. Commissioned by the
Montrose Development and
Revitalization Team (DART), it supports
their mission to grow Montrose as a
public art destination.

Reference Contact:

Michelle Wingfield
DART and Community Programs Coordinator
| www.jmelart.com
A Valley of Color | Montrose, Colorado 2025

154 of 336

Title: Resilient Reno
Dimensions: 76’ x 24’
Client: Nevada State Bank
Location: Reno, NV
Year: 2021
Materials: Spray Paint on Stucco
Timeline: 9 days
Video Link: CLICK HERE
Process & Information:

This mural, painted live during Reno’s
Artown on Nevada State Bank’s West
Liberty building in Reno, uses my
signature low-polygon style to merge
themes of technology, nature, and place.

The design highlights the high-desert
mountains and surrounding waterways,
creating a modern visual language that
still feels grounded in the landscape and
familiar to anyone who calls Reno home.

As with much of my work, the piece
explores how contemporary design can
shape the way we experience our
environment. By blending bold geometry
with natural forms, the mural aims to
inspire creativity, encourage exploration
of the outdoors, and bring a sense of
welcome and connection to the West
Liberty site.

Reference Contact:

Sandi Milton
SVP , Marketing Communications & Events,
Nevada State Bank
| www.jmelart.com
Resilient Reno | Reno, Nevada 2021

155 of 336

156 of 336

157 of 336

Installation & Safety Plan

San Bruno Centennial Plaza Mural

JMEL Art | Jesse Melanson

The mural installation process would begin with basic surface preparation and primer application to ensure proper paint adhesion and long-term durability. My workflow typically includes site layout/grid application, large-scale color blocking, geometric detailing, refinement, and final protective clear coating application.

I primarily work with artist-grade MTN 94 aerosol paints and exterior mural paints, followed by protective coating systems including MuralShield and anti-graffiti coatings for long-term protection and maintenance.

For elevated work, I prioritize lift operation over ladder use whenever possible — a philosophy I often describe as “lifts, not ladders” for improved safety, stability, and efficiency on large-scale projects. Depending on final site conditions and wall height, equipment may include articulating boom lifts or scissor lifts. I am OSHA Safety Certified for Aerial and Scissor Lift operation and American Safety Council Certified for Aerial and Scissor Lifts.

Traffic and pedestrian safety are an important part of my installation process, particularly within active public spaces. Work zones are clearly defined using cones, caution barriers, and visible work area boundaries to help maintain safe pedestrian circulation throughout the installation. I also wear high-visibility protective equipment and follow OSHA-compliant safety practices throughout the duration of the project.

Based on the available site imagery and project materials, the existing permanent structures and landscaping do not appear to present any significant conflicts with the proposed mural installation process.
www.jmelart.com

158 of 336

Proposed Fee Details

San Bruno Centennial Plaza Mural

JMEL Art | Jesse Melanson

Total Project Fee: $65,000
Budget Breakdown
• Artist Design & Creative Fee — $12,000

Concept development, digital rendering, revisions, project coordination, and overall creative direction.
• Materials & Supplies — $9,000

Artist-grade MTN 94 aerosol paints, exterior mural paints, primer, masking materials, MuralShield protective coating, anti-graffiti coating systems, and general consumables.
• Equipment Rental — $8,000

Articulating boom lift and/or scissor lift rental, delivery, pickup, and associated operational costs required for safe mural installation. • Travel & Lodging — $6,000

Transportation, lodging, meals/per diem, and travel-related expenses associated with completing the project on-site.
• Installation & Execution Labor — $24,000

Large-scale mural layout, painting, detailing, finishing work, and final protective clear coating application.
• Assistant Support, Insurance & Contingency — $6,000

Additional labor assistance if needed, insurance, contingency planning, PPE, and unforeseen project-related expenses.

The proposed fee is intended to cover all phases of the mural process for the approximately 1,260 sq ft Centennial Plaza mural project. All work would be completed by the artist as lead muralist, overseeing design, coordination, production, installation, and final finishing.
www.jmelart.com

159 of 336

Maintenance Guide Outline

San Bruno Centennial Plaza Mural

JMEL Art | Jesse Melanson

Maintenance Guide Outline
The completed mural would be protected using a professional clear coating system including MuralShield and anti-graffiti coating products intended to provide long-term UV and surface protection. Under normal conditions, the mural should require very minimal maintenance for many years.

Recommended Maintenance
• Gentle cleaning using low-pressure water and mild non-abrasive soap if necessary. • Avoid abrasive cleaning tools, harsh chemicals, pressure washing at close range, or solvent-based cleaners directly on the mural surface.
• Reapplication of the protective MuralShield coating is recommended approximately every 5 years to maintain optimal UV protection and long-term durability.

When properly maintained, the coating system is intended to significantly extend the life of the mural and help preserve color vibrancy for decades.

Touch-Ups & Repairs
Minor touch-ups or repairs are not recommended to be performed directly by general city maintenance staff, as matching aerosol color systems, geometric alignment, and coating compatibility require familiarity with the original materials and process. Original color references and paint information can be provided for archival purposes if requested.

If future repairs, vandalism removal, or maintenance become necessary, I would welcome the opportunity to be contracted directly to perform restoration work in order to maintain the integrity and visual consistency of the mural.

Future Maintenance Rates
• Estimated Artist Maintenance Rate: $100/hour
• Minimum Repair Visit Fee: $1,000 minimum
• Additional costs may include:
◦ Travel and lodging reimbursement
◦ Equipment/lift rental
◦ Material and coating replacement costs
◦ Assistant labor if required
Any future maintenance scope and pricing would be discussed collaboratively based on the extent of the repair and site conditions.
www.jmelart.com

160 of 336

DAY
NIGHT

161 of 336

Mershon Menard
| www.streetofferings.com

I was so excited to see a mural wanted in San Bruno! My husband was born and raised in San Bruno, and we are now raising our kids and have a business in here, so I want to be a part of making San Bruno inviting for all ages.

This mural is designed to bring fun colors and movement to San Bruno through a playful, graphic interpretation of the local landscape. Inspired by rolling hills, native California fl owers, and the rhythm of the surrounding environment, the composition blends geometric shapes with organic forms to create something that feels both familiar and reimagined. A silhouetted airplane moves across the sky, subtly referencing the area’s connection to travel while adding motion and storytelling. The bright palette keeps the piece lively, warm, and inviting.

To add an extra layer of experience, select elements of the mural will glow in the dark, by using phosphorescent paint that glow naturally in the dark and illuminates under UV black lights. By adding this specialty paint into the design, it will subtly transform the piece at night. Flowing lines, parts of the landscape, and accents within the fl owers will softly illuminate, creating a sense of surprise and discovery for viewers after sunset.

Overall, the goal is to create a mural that feels uplifting, a little unexpected, and rooted in a place I hold dear to my heart. I want to bring color and energy to the space while giving the community something fun to return to, both day and night.

162 of 336

Mershon Menard
| www.streetofferings.com

I was genuinely excited to see a call for a mural in San Bruno. This project feels personal as my husband was born and raised here, and now we are raising our children and running a business in the community. I would love to contribute to making San Bruno more vibrant, welcoming, and engaging for people of all ages.

My approach to public art is rooted in accessibility and joy. I create murals that are bold from a distance and layered with details up close, inviting repeat engagement. With a background as an arts educator for 12 years, including nine years with the San Francisco Unifi ed School District, I bring a strong understanding of how people experience movement, space, and creativity. Murals are a shared place where people pass through, gather, and connect.

I have experience across a range of site-specifi c projects, from backyard and garage murals to public-facing work. I am currently designing and painting a mural for the Daly City Serramonte Library (approximately 120 in x 70 in), and have completed murals across San Francisco. I also volunteered on a large-scale project with international artist eL Seed, which deepened my experience working collaboratively at scale. Each project begins with studying the site to create a design that feels integrated and intentional.

My work blends graphic structure with organic forms inspired by local landscapes and plant life. I use high-quality exterior materials and incorporate both digital planning and on-site techniques. For this project, I will include glow-in-the-dark elements to create a subtle day- to-night transformation. Ultimately, my goal is to create murals that bring color, energy, and a sense of connection to the community.

163 of 336

Hamburger Wings, 2022
for Papa Maks in San Francisco
7ft x 7ft outdoor mural
This was a collaboration with Papa Maks, a
neighborhood hamburger spot in the Sunset
District in San Francisco. They had the idea,
I created the final design and painted this
on the outside of their restaurant to attract
those angelic photogenic customers.

WORK IN PROGRESS
Indoor mural; paint on wall; 38 ft x 6.5 ft
Daly City Public Library, Serramonte Location
Currently working on a mural for DCPL. I am the lead
artist and designer for project. Below is the final sketch and above are the latest work in progress photos.

Expected to be completed by May 21, 2026

164 of 336

Chicken Trio, 2025
for private client in San Francisco
10ft x 10ft outdoor mural
I was hired to design and execute a custom
mural for a client’s private garage door.

The Mountain’s the Limit, 2024
for Milestone Explorers Preschool in San Francisco
20ft x 12ft indoor mural
I was hired to design and execute a custom mural
for a preschool that was in line with their brand
Sunset, 2020
for Amity Market
in San Francisco
40ft x 12ft
outdoor mural
I was given creative
freedom to design
and execute a
community friendly
mural to cover up
graffiti.

165 of 336

Rainbow Flowers, 2020
for Hotel Zephyr
in San Francisco
10ft x 10ft
outdoor mural
During COVID, I was asked
to participate in a group
show painting boarded up
businesses near Fisherman’s
Wharf. I chose something
that would brighten up the
dim world we were
experiencing.

Network, 2017
for Gigster
in San Francisco
40ft x 12ft
indoor mural
I was the lead artist on the project.

I worked with 3 other artist to paint
the given design in a timely and
professional manner. I coordinated
between artists and client to make
sure work was done without
disruptiing working staff or
creating a mess.

166 of 336

Mershon Menard
| www.streetofferings.com | Daly City, CA

OBJECTIVE:

Creative and professional artist seeking an financial support to continue creating artwork for the community.

Passionate about murals that transform spaces into visually engaging experiences, while fostering an appreciation for diverse artistic expressions within the community.

QUALIFICATIONS:
● Versatile Artist: Skilled in murals, painting, drawing, mixed media, and photography, with a portfolio spanning various mediums and styles.
● Client-Centered Muralist: Over a decade of experience coordinating, designing, and executing murals, delivering visually im
pactful artwork that meets specific client needs and brand identity. ● Leadership in Large-Scale Projects: Successfully led a team of artists to create multi-wall murals for corporate office spaces, demonstrating strong leadership, collaboration, and problem solving skills. ● Commissioned Artist: Designed and painted multiple murals for personal and business clients, showcasing the ability to create customized, site-specific artwork that resonates with diverse audiences. ● Exhibited Artist: Showcased artwork in both indoor and outdoor gallery spaces, demonstrating
flexibility in presentation
● Strong Time Management & Communication: Exceptional ability to manage time effectively, balancing creative vision with project deadlines, while maintaining clear communication with clients and teams.
● Technical Proficiency: Proficient in Photoshop, Procreate, and Illustrator, with the ability to create digital designs and mockups for both large-scale and small-scale projects.

PROJECTS:

Little Houses on the Hillside, DCPL Inside mural, 40ft x 7ft Daly City, CA Owl Garden, private commission Outside mural, 15ft x 10ft San Francisco, CA Chicken Trio, private commission Outside mural, 10ft x 10ft San Francisco, CA Mountain background for Preschool Inside mural, 40ft x 12ft San Francisco, CA Burger Wings for Papa Maks Burg era Outside mural, 8ft x 8ft San Francisco, CA Sunset Mural for Amity Market Outside mural, 10ft x 40ft San Francisco, CA
Rainbow Flowers for Hotel Zephyr Outside mural, 8ft x 8 ft San Francisco, CA Background Work Wall for Gigster Inside mural, 40ft x 12ft San Francisco, CA Welcome Lobby for Gigster Inside mural, 12ft x 12ft San Francisco, CA Staff Lounge for Gigster Inside mural, 12ft x 12ft San Francisco, CA Route 66, private commission Outside mural, 6ft x 6ft
San Francisco, CA
Flowers in Clouds for The Reggae Bar Outside mural, 20ft x 10 ft San Antonio, TX Fence Flowers, private commission Outside mural, 8ft x 5ft San Antonio, TX Book & Job Gallery Showcases Mixed Media on canvas San Francisco, CA So What Zine Collaboration Mixed Media, zine print San Francisco, CA Hashtag Lunchbag SF Collaboration Mixed Media, brown bags San Francisco, CA Mission20/Fnnch Collaboration Outside mural, 5ft x 5ft San Francisco, CA
Anniversary Flowers, private comm. Inside mural, 2ft x 5ft San Francisco, CA Flower Bridge, private commission Inside mural, 12ft x 10ft San Francisco, CA Dream Big, private commission Inside mural, 12ft x 12ft San Francisco, CA Sunset Mountain, private commission Inside mural, 20ft x 12ft San Francisco, CA Clarion Alley Paint Assistant Outside mural, 10ft x 10ft San Francisco, CA T
ogether Alone Online Gallery Digital Drawings
Street Offering Merchandise Shirts, hoodies, bags, stickers Digital Drawing s

167 of 336

Mershon Menard
| www.streetofferings.com

Project Approach & Site Plan

My goal for this mural is to create a piece that feels integrated into the space while being durable, safe, and accessible to the public throughout installation.

Wall Preparation: 1-2 days

Before starting the mural, I will need to assess the wall, clean the surface, and apply a primer coat.

Sketching & Layout: 2-3 days

The design will be scaled onto the wall using projection, so we will need to arrange to work after sunset

Painting: 14-20 days

Working with a team, we will coordinate who is painting where making sure we take into account lift rental days. Glow in the dark paint will be applied to select features to create a subtle shift from day to night.

Final Coat & Clean-Up: 1-2 days

Once the mural is complete, a protective anti-graffi ti coating will be applied to preserve the work. All materials, equipment, and debris will be removed, and the site will be returned to a clean, safe condition.

Equipment

A projector will be used during the layout phase to accurately translate the design onto the wall. A scissor lift will be used for higher sections and broad coverage, while ladders and scaffolding will allow for more detailed work.

Traffic & Pedestrian Safety

The work area will be clearly marked with barricades and signage, and pedestrian fl ow will be guided safely around the space. I’m mindful of working within active public areas and will plan the installation to minimize disruption as much as possible.

OSHA Compliance

We will be sure to follow OSHA guidelines by including proper use of protective gear, safe operation of equipment, and keeping a clean, organized worksite.

168 of 336

San Bruno Mural Budget
Data

ARTIST FEES HOURS PRICE/HR TOTAL
Lead Artist & Execution 200.0 100.0 20000.0
Design & Concept Develop. 30.0 100.0 3000.0
Surface Prep 10.0 80.0 800.0
Assistants 160.0 30.0 4800.0
Site Clean-Up 10.0 100.0 1000.0

PAINT & MATERIALS QTY PRICE/QTY TOTAL
Exterior Wall Paint 20.0 40.0 800.0
Spray Paint 150.0 9.0 1350.0
Glow in the Dark Paint 7.0 320.0 2240.0
Anti-Graffiti Coat 5.0 60.0 300.0
Brushes/Rollers 10.0 10.0 100.0
T arps & Cleaning supplies 5.0 15.0 75.0

PERMITS/RENTALS DAYS PRICE/DAY TOTAL
Scissor Lift 14.0 600.0 8400.0
Barricades 21.0 150.0 3150.0
Scaffolding & Ladders 21.0 90.0 1890.0
Projector Rental 4.0 300.0 1200.0
City Permit 500.0 500.0
Liability Insurance 400.0 400.0

TRAVEL/MISC QTY PRICE/DAY TOTAL
Parking 6.0 21.0 126.0
Travel fees/tolls/etc 900.0 900.0
Contingency (8%) 4000.0
GRAND TOTAL 55031.0

ARTIST FEES

Lead Artist & Execution: Covers full
development & on-site execution of
mural, including scaling design to wall,
painting, detailing, and overseeing the
project from start to completion.

Design & Concept Development:

Includes concept sketch, revisions, final
renderings, & planning of glow-in-the-
dark elements to ensure a cohesive day &
night experience.

Surface Preparation: On wall surface
prior to painting, including cleaning,
patching, and priming
Assistants: Support with layout, base
layers, and production to ensure timely
completion of the mural.

Site Clean-Up: Removal of materials &
paint supplies

PAINT & MATERIALS
Exterior Wall Paint: High-quality,
weather-resistant paints for outdoor
murals to ensure durability and color
retention.

Spray Paint: Used for details and certain
design colors
Glow-in-the-Dark Paint: Specialty paint
applied to select part of the mural to
create a subtle glowing effect at night
Anti-Graffiti Coat: Protective clear
coating applied over the mural to guard
against vandalism and allow for easy
cleaning.

Brushes/Rollers: Will need 1 brush per
artist for each color
T arps & Cleaning Supplies: Want to
ensure the surrounding areas are clean
and paint free!
PERMIT & RENTALS 1

169 of 336

PERMIT & RENTALS
Scissor Lift: Needed to sketch and paint
higher parts of wall
Barricades: T emporary barriers to
ensure pedestrian safety and define a
safe work zone during installation.

Scaffolding & Ladders: Additional
equipment used for area not requiring lift
use. May be used at the same time while
lead artist or assistants paints a different
section
Projector Rental Used to accurately
transfer the design onto the wall, ensuring
correct proportions and layout.

City Permit: Required fees for
installation of public artwork.

Liability Insurance: Needed to meet
city requirements and ensure safety.

TRAVEL & MISC
Parking: Need 3 artists cars and 2
spaces for the scissor lift
Travel Fees / T olls: Transportation costs
associated with commuting to and from
the site and transporting materials.

Contingency (8%): Accounts for
unforeseen conditions such as weather
delays, surface repairs, or additional
material needs, so that the project can be
completed smoothly without
compromising quality.
2 170 of 336

Mershon Menard
| www.streetofferings.com

Mural Maintenance & Conservation Plan

This mural is designed for durability in an outdoor environment, using high-quality exterior paints and a protective anti-graffi ti coating. With proper care, the artwork will maintain its color and integrity for many years.

Cleaning Recommendations

Routine cleaning can be done using a soft cloth or sponge with mild soap and water. For areas coated with anti-graffi ti sealant, low-pressure washing may be used if needed. Harsh chemicals and abrasive tools should be avoided, as they may damage the painted surface or protective coating. Any graffi ti or marks should be removed promptly using products compatible with the anti-graffi ti layer.

Protective Coating Reapplication

To maintain protection, it is recommended that the anti-gra ffiti coating be reapplied approximately every 3–5 years, depending on weather exposure and wear. High-contact or high-traffi c areas may require more frequent reapplication.

Color References for Touch-Ups

A record of paint colors, brands, and fi nishes used in the mural will be provided to the City upon completion. This will allow for accurate touch-ups in the future and help maintain the integrity of the original color palette, including both standard and glow-in-the-dark elements.

Glow in the Dark Longevity

Over time, glow intensity may gradually decrease due to UV exposure and weathering.

Touch-ups may be required periodically to maintain brightness, particularly in high- exposure areas. Original paint specifi cations will be provided to ensure accurate restoration.

Future Repairs & Artist Involvement

While the City will be responsible for ongoing maintenance, I would welcome the opportunity to be involved in any future repairs or restoration work to ensure consistency with the original design and intent.
• Hourly Rate: $100/hour
• Minimum Fee: 4-hour minimum per visit
• Materials & Equipment: Reimbursed as needed
• Travel: Local travel included; additional travel or accommodations (if required) to be covered by the City

171 of 336

172 of 336

ARTIST STATEMENT
I am VERY interested in being chosen to install a timeless, long lasting art piece that will speak with both art fans and San Bruno residents. Centennial Plaza park in lovely downtown San Bruno is a space that I’ve spent much time with family and friends while in the Peninsula.

My approach to Large-scale Public-murals is to use all my art skillsets to provide a professional artwork full of story and relevance to each site. Following historical and cultural story, each mural represents era’s, regional landscape & landmarks.

With over 30 YEARS OF COMMERCIAL DESIGN for a variety of industries and genres. I continue to challenge myself and always try to do my best work moving forward.

Today, I’ve personally installed FULL-COLOR, HAND-PAINTED murals in Sacramento, South lake Tahoe, Danville, Pleasanton, Hayward, Benicia, Crocket and Vallejo. More sites are in the works.

Mural process/Install; Typically each site will require ladders, scaffolding or a lift. Centennial Plaza appears to be a ladder and scaffolding solution.

I am the primary artist at work, capable of long hours and great focus.

I do have access to 2 additional staff artists if needed. We have each worked together on previous projects with great success. -VincentB

173 of 336

174 of 336

175 of 336

176 of 336

177 of 336

178 of 336

179 of 336

180 of 336

ARTIST RESUME
Vincent Concepcion (art with VincentB)
1995-2001 Professional Airbrush Artist
2001-2005 Silkscreen and apparel design industries
2005-2010 Freelance Design (stickers, posters, greeting cards) 2011-Present Self-Employed Artist, Muralist and Art Instructor in Benicia & Vallejo CA
Greetings, my name is Vincent Concepcion, a Professional Muralist and Art instructor for High School & Elementary Schools in Benicia CA. I live and work from Vallejo California with my wife and we have an son in 5th grade.

I’ve dedicated my entire life to visual arts for a variety of industries and for different age demographics. Working in fashion graphics, Sign painting, Logo design and Contemporary arts has given me great rewards and a well-rounded perspective on all things visual.

My projects are typically by referral, meanwhile I continue to teach and host youth- senior art classes for schools & private venue settings.

I invite you to preview my social media to find postings of all things art, family and general life as a California artist. www.instagram.com/artwithVincentB Thank you for your time and consideration,
-Vincent Concepcion (VincentB)

181 of 336

Installation & Safety Plan
As the current condition of the wall is ready for painting, my installation process is as follows:

Masking all edges and ground coverings using high-quality mask tapes and clear coverings.

The image of the mural is transferred by freehand drawing the layout and flow of the approved concept. Largest areas are painted first working from the top to bottom, left to right so that finished areas are not disturbed by the continuous mural process.

Ladders and scaffolding will be required & I have the tools to reach all areas of this proposed mural including the highest point (15 ft).

Safety Plan
I maintain a valid Business Insurance policy with State Farm in Benicia CA, to protect the property and liabilities involved with mural installation. (Provided upon request)
I wear safety gear where applicable and conduct myself with professionalism with all parties involved. Including residents and pedestrians, building advocacy for the art installation while in process.
-Vincent Concepcion (VincentB)

182 of 336

Proposed Fee Details
I propose to fully-design & hand-paint this 1060
square foot mural onto the Centennial Plaza park
for my 2026 rate of $50 per square foot.
1060 sq. ft x $50 = $53k
This fee includes all ART & DESIGN moving forward,
revisions by committee, all paint and Art tool materials. I include ladders, scaffolding to reach all areas of the wall.

Upon completion and final approval of the mural by all
parties involved, I apply a Clear silicone sealant, also known a Anti-Graffiti Sealant. An outstanding material
which contains UV protection and weather proof
protection.

I do have family living in the city of San Bruno and a small RV for use if needed. So there are no travel and lodging requirements while installation is underway.
-VincentB

183 of 336

Maintenance Guide Outline
Once the Mural is SEALED with Clear Silicone, it will
be waterproof and sealed from new mediums being
applied to the surface.

I am willing to address any concerns should they arise.

I use the highest-quality materials and have had no
issues with previous installations. Please review client testimonials (available upon request).

I guarantee the murals finish, color & craftsmanship to
hold for many years and will be available for repair in the event of vandalism or structural damage due to
unforeseen circumstances.
-VincentB

184 of 336

185 of 336

186 of 336

187 of 336

188 of 336

189 of 336

190 of 336

191 of 336

192 of 336

193 of 336

194 of 336

195 of 336

I have watched and remembered this city breathe for almost a hundred years.

I was told about the Ohlone people who first named these hills and creeks, who read this land like a language the rest of us are still learning. I was told about the Spanish road that wound through the peninsula, connecting mission to mission, leaving a path that would one day become the street we all call home.

I have seen the fields that fed San Francisco — the dairies, the flowers, the farms that rose from the soil of Rancho Buri Buri after the ranchos were divided and sold and divided again. I remember the fog that rolled in every morning over hills that smelled of milk and earth and blossoms, flowers so abundant they would one day fill the arms of every child in the city.

I grew up on stories of families who arrived with nothing after the earth shook in 1906 and built something that lasted. And on harder stories too — of Japanese American families taken from these same streets — neighbors, friends, gone overnight — a wound this city has carried quietly ever since.

I remember Tanforan. I remember the sound of hooves and the roar of crowds, the way this city dressed up and came alive on race days. I also remember what that same ground became — the silence of families arriving with their belongings, told to stay. The same soil that once thundered with Seabiscuit now held something heavier. Today people push shopping carts where all of that happened. I have never forgotten.

I was told about a pilot who took off from Tanforan in 1911 and landed on a ship in the Bay, changing what people believed was possible. I was told about mudflats becoming an airport. These were the stories of my city — a place that was always reaching upward, always becoming something larger than itself.

I have seen new families arrive from every direction. Filipino families who came to care for the sick and the elderly, who gave this city their hands and their hearts. Chinese families who found their footing on these streets. Latino families whose hands built and harvested and fed this city quietly and without recognition.

Each one brought a language, a meal, a way of celebrating, a way of grieving. Each one added their thread to ours. And now I watch the children of all of them run through the same parks, march down the same streets, fill this city with a joy that belongs to all of us. That is the part that makes everything worth remembering.

One thread runs through all of it.

I know because I have held it my whole life.
— Patty Lang, 1944 Posy Parade Princess
A thread, a hundred years.

Artist's Note: This statement is a piece of imaginative creativity, inspired by the perspective of Patty Lang and the historical context of San Bruno. The words and recollections shared here are not her personal experiences.

196 of 336

| w w w . v e n a z i r . c o m
Artist Statement
I believe there is a red thread that guides us, stretching across time, space, and memory, connecting us through our shared histories and identities. This thread does not break; it tangles, adapts, and evolves, much like the people and communities whose stories it carries. I have dedicated my life's work to painting this connection for almost nine years, intertwining human narratives with urban spaces through large-scale murals that serve as cultural markers for dialogue.

San Bruno is a city that has never fully seen itself reflected on its own walls. This project is an opportunity to change that — to take one hundred years of layered, complicated, beautiful history and render it in a strikingly vibrant way that every resident, regardless of age or background, can recognize themselves in. What drew me most deeply to this project is Patty Lang, a footnote I read while reading the history of San Bruno — not as a singular subject but as a lens. A woman who has witnessed this city's entire transformation. Her story reflects the many experiences of San Bruno residents — the arrivals, the losses, the celebrations, the silences, and the quiet pride of belonging to a place that has survived everything thrown at it. The chance to honor that through public art felt urgent and necessary.

My work style is story-led, community-rooted, and research-driven. I approach murals like visual anthropology — I listen first, gather lived histories, and translate them into symbol-rich compositions rather than literal realism. My process begins long before a brush touches a wall. Through interviews, archival research, and sustained presence within the community, I gather the stories, memories, and voices that will ultimately shape the work. For San Bruno, this means going beyond documented history into the undocumented one — the stories passed down in kitchens, the memories held by elders, the experiences of communities whose contributions have never been formally recorded. The digital rendition presented here is a framework. The living community will fill it with its truth.

The process moves through four distinct phases. Research and Immersion involves archival research, community interviews, site visits and story gathering from San Bruno residents across all generations and backgrounds. Design Development follows, building a digital composition from research findings through community feedback sessions and iterative refinement with city stakeholders. Surface Preparation ensures the wall is power washed, cleaned, primed and sealed, with exterior grade primers applied to protect against heat and moisture. Finally, Execution transfers the composition to the wall using a doodle grid or projection method via Meta Quest, with high quality exterior latex and acrylic paints applied using a Graco Sprayer and finished with a UV resistant anti-graffiti clear coat to protect the work for decades.

This project is realized through a focused two-person team. The Lead Artist carries full responsibility for the overall vision, community immersion, design direction and final execution of the mural — from the first archival research session to the final brushstroke. Supporting the process is my Documentation T eam / Bay Area FPV who photographs and films every phase of the work, from community immersion through completion, producing a living record of the project for archival, educational and public engagement purposes. T ogether the team ensures that the mural is not only painted with integrity but preserved as a story in its own right — a document of how a community came to see itself on a wall.

197 of 336

198 of 336

199 of 336

200 of 336

201 of 336

202 of 336

| w w w . v e n a z i r . c o m
Installation & Safety Plan
Wall Preparation & Site Protection
Before any painting begins, the wall surface will undergo power washing to eliminate dirt, debris, and existing residues. Once the surface is dry, delicate areas such as the roof lining and adjacent structures will be meticulously taped and masked to prevent paint contact. Established plants and landscaping at the wall's base will be shielded with protective plastic sheeting throughout the installation. A high-quality exterior-grade primer will then be applied to seal the surface, ensuring optimal paint adhesion and longevity in the Bay Area's coastal climate. The pergola columns will also be masked and protected during the process, and all protective coverings will be removed, restoring the site to its original condition upon project completion. The execution will involve transferring the composition to the wall using a doodle grid or projection method via Meta Quest, followed by the application of high-quality exterior latex and acrylic paints using a Graco Sprayer, finished with three coats of UV-resistant anti- graffiti clear coat (Mural Shield) to protect the artwork for decades. Mural Shield will be applied with a handheld compression sprayer.

Equipments
An articulated boom lift will provide flexible and precise access to all sections of the wall without encroaching on the plant boxes at the base. A 22-foot multi-use ladder will supplement the boom lift for detailed work requiring closer access. All equipment will be operated by certified personnel and inspected daily before use. Ground tarps will be laid beneath the work area to protect existing hardscape surfaces from paint overspray and drips. The artist carries full liability insurance covering all phases of the installation.

Traffic & Pedestrian Safety
The mural is located within an active public plaza. Safety cones, barriers, caution tape and signage will be placed to clearly delineate the work zone and maintain safe pedestrian pathways throughout the installation. No work area will obstruct emergency access points. The artist will adhere to designated working hours to minimize disruption to plaza activity.

OSHA Compliance
Personal protective equipment including gloves, safety glasses, respirators and non-slip footwear will be worn at all times. All equipment will be inspected daily in accordance with OSHA standards. A first aid kit will be kept on site throughout the duration of the project.

203 of 336

LINE ITEM BUDGET FOR CENTENNIAL MURAL PLAZA
Project Period: August 11 – September 30, 2026
Budget Category / Line Item Timeline Amount
A. Design, Community Engagement, and Project
Development Aug 11 – Sep 8, 2026 $4,500
• Lead artist design fee, research, and concept
development —
• Community engagement and feedback process —
• Project management, meetings, and coordination —
• Up to three design revisions, mockups, and final approval materials —
B. Wall Preparation and Installation Sep 8 – Sep 30, 2026 $26,000 • Lead artist installation labor $15,000
•Documentation Team $5,000
• Power Wash and surface preparation $1,000
• Primers, exterior paints, and painting supplies $5,000 C. Equipment Rentals, Safety, and Site Operations Aug 11 – Sep 30, 2026 $5,600
• Boom lift and ladder rental $2,000
• Graco Paint Sprayer $1,600
• Barricades, cones, caution tape, and site protection $250 • Personal Protective Equipment (PPE) $250
• Parking, gas for transportation, and daily material removal $1,500 D. Protective Coatings, Insurance, and Compliance Sep 8 – Sep 30, 2026 $4,500 • UV-protective and anti-graffiti coatings, up to three coats $1,500 • General liability insurance $1,000
• Permits, taxes, and compliance costs $1,000
E. Contingency | Included Across Line Items Aug 11 – Sep 30, 2026 $1,000
• Distributed across labor, materials, and logistics
categories —
F. Future Repairs and Maintenance Reserve $10,000
Future touch-ups and restoration labor reserve $4,000
Future materials and color-match supplies $2,000
Future UV / anti-graffiti recoating $1,500
Future equipment access and site setup $1,500
Future parking, transportation, and logistics $1,000
TOTAL: Design, Fabrication, and Installation $51,600

204 of 336

| w w w . v e n a z i r . c o m
Maintenance Guide
Cleaning Methods
The mural surface is protected with a UV resistant anti-graffiti clear coat and should be cleaned every six months using a soft brush or low-pressure water rinse to remove surface dust, dirt, and environmental residue. In the event of graffiti or vandalism, a compatible graffiti removal solution should be applied immediately. Harsh chemical solvents, abrasive tools, and high-pressure power washing directly on the painted surface should be avoided at all times.

Coating Reapplication
The anti-graffiti clear coat should be inspected annually and reapplied every three to five years depending on UV exposure and surface wear. Reapplication should be performed by a qualified muralist or coatings professional to ensure compatibility with the original materials.

Color References
A complete color reference document including paint brands, product names, color codes and mixing formulas will be provided to the city upon acceptance of the finished mural and stored in the city's permanent records for future touch-up work.

Artist Maintenance & Repair
The artist strongly desires to be contracted for all future repairs and maintenance to preserve the mural's integrity and original vision. A proposed future maintenance budget of $10,000 is allocated for this purpose under the following terms:

Hourly Rate — $50 per hour
Minimum Fee — $500 per repair visit
Materials & Equipment — billed at cost and reimbursed by the city Travel & Accommodations — covered by the city for any repair requiring travel Scheduling — minimum two weeks notice required
The city assumes full responsibility for all mural maintenance following formal acceptance of the completed work. The artist remains available for consultation and encourages early contact at the first sign of deterioration to prevent minor issues from becoming significant restoration projects.

205 of 336

Anne-Sophie Gaudet - Concept Design
San Bruno Centennial Plaza Mural
Title of the mural: Celebration

Brief Concept Narrative:

This mural captures a moment of preparation, where two people help each other install a garland of lights in oak trees, transforming the space in anticipation of a shared celebration.

Their gesture reflects a simple but meaningful act of collaboration, where individual effort contributes to a collective experience.

Set within stylized oak branches, the composition is rooted in the natural landscape of San Bruno. The color palette is bright and harmonious, with touches of orange and blue inspired by the tables and chairs in the plaza, creating a visual connection between the mural and its surroundings.

The style is modern and simplified, using clean shapes and blocks of color while remaining figurative and accessible. A sense of movement and lightness flows through the piece, expressed in the rhythm of the branches and the lines of the garland. “Celebration” reflects the spirit of community, coming together, supporting one another, and creating joyful shared moments in a public space.

206 of 336

207 of 336

Anne-Sophie Gaudet
Centennial Plaza Mural
Artist Statement
I am a Bay Area muralist creating large-scale, nature-inspired artworks that celebrate community, place, and the beauty of the natural environment. As a local artist, I am especially interested in contributing to San Bruno’s public spaces and creating a mural that feels connected to the city’s identity and daily life.

My work is rooted in observation of the landscapes around me, trees, hills, and light, and I translate these elements into simplified, modern compositions using clean shapes and harmonious color palettes. I aim to create murals that are both visually striking and calming, bringing a sense of joy, movement, and balance to public environments.

For this project, my concept Celebration reflects the value of community through a simple, relatable moment: two people helping each other install a garland of lights in oak trees in preparation for a shared event. This gesture symbolizes collaboration, care, and the collective effort that brings people together. The composition integrates stylized oak branches inspired by the local landscape, and a bright palette with accents of orange and blue that echo the existing elements of Centennial Plaza, creating a strong connection to the site.

My approach to public art is to create work that is accessible, uplifting, and rooted in its environment. I consider how people will experience the mural from different perspectives and aim to create compositions that feel dynamic yet clear from a distance. I also value opportunities for community engagement and am open to incorporating feedback to ensure the mural resonates with the people who use the space.

My process begins with research and site observation, followed by digital sketches and color studies developed in close communication with stakeholders. Once the design is finalized, I prepare the surface with cleaning and priming, then execute the mural using high-quality exterior acrylic paints. The work is finished with UV-protective and anti-graffiti coatings to ensure long-term durability.

I have experience creating public murals for cities including Palo Alto, Mountain View, and Tustin, as well as large-scale projects in desert and urban environments. I have also participated in Mural Madness in San Mateo, and my work has been exhibited locally, including at Atelier for Healing in San Bruno and later at the Center for Creativity in Redwood City. I manage all aspects of production, from design to installation, and when needed, I work with assistants to support large areas of color application while maintaining overall quality and consistency.

Through my work, I aim to create meaningful visual experiences that reflect a sense of place and bring people together. This project is an opportunity to contribute a joyful, site-specific mural to San Bruno that celebrates connection, nature, and shared moments.

208 of 336

Anne-Sophie Gaudet – Collaborative Experience and Past Projects I have completed public art projects for the cities of Palo Alto, Mountain View, and Tustin, developing site-specific murals in collaboration with city staff and community stakeholders creating durable, large-scale artworks in public and institutional settings. I manage all phases of production and design murals that are visually strong, site-responsive, and built for long-term public use.

Project 1 - Midpen Media Center,
Palo Alto, Public Art
Project name: Tribute to the Horse In Motion
by Muybridge
Location: Midpen Media Center, 900 San
Antonio Road, Palo Alto, CA 94303.

Dimensions: 5’ x 126’
Media: brush paint, acrylic, primer and coating
from MuralColors.

Completion date: May 2025
Artist’s role: lead artist
Project 2 - City of Tustin, department
of Parks and Recreation
Project name: Blimps over the Ocean (tribute to
veterans), public art
Location: Veterans Sports park, Tustin, California.

Dimensions: 33’ x 8’ Media: brush paint, acrylic,
primer and coating from MuralColors.

Completion date: April 2025 //Artist’s role: lead artist Project 3 - Richardson and Oliver Law Group,
project facilitated by Arts Mountain View
association
Project name: Innovation In Motion
Location: 260 Moffett Blvd., Mountain View, CA 94043
Dimensions: 20’ x 30’
Media: brush paint, acrylic, primer and coating from
MuralColors.

Completion date: June 2025
Artist’s role: lead artist

209 of 336

Project 4 - Anza-Borrego Desert Natural
History Association
Project name: Borrego Sunrise
Location: 652 Palm Canyon Dr, Borrego Springs, CA 92004 Dimensions: 20’ x 11’
Media: brush paint, acrylic, primer and coating from MuralColors.

Completion date: October 2024 // Artist’s role: lead artist

Project 5 - Private residence
Project name: Iris
Location: Calderon avenue, Mountain View
Dimensions: 15’ x 30’
Media: brush paint, acrylic, primer and coating from
MuralColors.

Completion date: September 2025
Artist’s role: lead artist
Project 6 - Anza-Borrego
Desert Natural History
Association
Project name:

Location: 652 Palm Canyon Dr, Borrego
Springs, CA 92004
Dimensions: 30’ x 6’
Media: brush paint, acrylic, primer and
coating from MuralColors.

Completion date: November 2024
Artist’s role: lead artist

210 of 336

211 of 336

Anne-Sophie Gaudet
annesophiegaudet.com | @annesophiegaudetart

PROFESSIONAL PROFILE
Bay Area muralist specializing in large-scale, nature-driven public art. My practice translates landscape, movement, and environmental identity into bold, saturated, graphic compositions designed to read clearly at scale and reproduce effectively. With extensive experience collaborating with municipalities, nonprofit organizations, and community partners, I create work that is site-responsive, durable, and accessible to broad audiences.

SELECTED PUBLIC ART & MURAL COMMISSIONS
● Brace Water Center, McGill University, Quebec (April 2026) - Interior mural ● K-RAM Radio Station, CA (Jan 2026) - Public mural for community radio broadcasting NPR and KPBS content; celebrates communication and cultural connection. ● Hacienda Del Sol, Borrego Springs, CA (Jan 2026) - Large-scale desert landscape mural inspired by regional ecology.
● Private Residence, Escondido, CA (Feb 2026) - Custom desert landscape mural focused on light and environment.
● Richardson Oliver Law Group, Mountain View, CA (May 2025) - "The Flow of Innovation," 20’ x 20’ mural.
● Midpen Media Center, Palo Alto, CA (Apr 2025) - "Tribute to The Horse in Motion," 126’ x 5’ mural.
● Veterans Sports Park, Tustin, CA (Mar 2025) - "Blimps," 8’ x 33’ public mural. ● Outdoor Mural Residency, Gerlach, NV (2025-2027) - "High Rock Canyon," desert landscape mural.
● Anza Borrego Desert Natural History Association, CA (Sept 2024) - Four large exterior murals celebrating desert ecology.
● Borrego Art Institute Art Park, CA (Nov 2023) - Original landscape artworks printed on aluminum panels for outdoor educational installation.
● City of Palo Alto, CA (July 2024) - Utility Box Painting, ArtLift Grant Program.

EXHIBITIONS
● Borrego Art Institute, Borrego Springs, CA (Oct 2025) - Solo exhibition of oil paintings exploring the landscapes of the Anza-Borrego Desert.
●

RELATED EXPERIENCE
● INTL - Silicon Valley International School (2016-2023) – Visual Arts & Design Teacher

212 of 336

Anne-Sophie Gaudet
Installation & Safety Plan
Wall Preparation
Prior to painting, the wall will be thoroughly prepared, this includes pressure washing to remove dirt and debris. A high-quality exterior primer will then be applied to create a clean and stable painting surface.

Workflow & Timeline
The project will be completed over approximately 3 weeks, depending on weather conditions.

The process includes:
● Site setup and surface preparation
● Painting with high quality exterior acrylic paint (Nova Color) ● Application of UV-protective and anti-graffiti coatings from MuralColors.

Equipment & Access
A scissor lift or boom lift will be used to safely reach upper areas. Ladders may be used for lower sections. All equipment will be properly secured and operated in accordance with safety guidelines. Equipment placement will be coordinated to minimize disruption to the plaza.

Traffic & Pedestrian Safety
The mural site will remain active during installation, so maintaining safe public access is a priority. Clearly marked work zones will be established using cones, barricades, and caution tape. Signage will inform pedestrians of ongoing work. Pathways will be maintained whenever possible, and equipment will be positioned to allow safe circulation. Materials and tools will be organized and secured daily to prevent hazards.

OSHA Compliance & Safety Practices
All work will follow OSHA safety standards, including the use of appropriate personal protective equipment (PPE) such as gloves, safety glasses, and high-visibility clothing when required. Lift operation will follow certified safety procedures. The work area will be kept clean and organized to reduce risks, and all materials will be handled and disposed of responsibly.

Site Considerations
The mural design and installation will respect existing permanent structures and landscaping within Centennial Plaza. Care will be taken to protect nearby elements such as seating, paving, and planted areas. Ground protection (tarps or coverings) will be used where necessary to prevent paint spills or damage.

Cleanup & Restoration
At the end of each workday, the site will be cleaned and secured. Upon project completion, all materials, equipment, and debris will be removed, and any accidental marks or spills will be fully addressed, leaving the site in clean condition.

213 of 336

Mural Budget Proposal – Centennial Plaza, San
Bruno
Anne-Sophie Gaudet
annesophiegaudet.com
Project Size: 1,060 sq ft
Proposed Total Budget: $44,000
Category Details Cost
Artist Fee Design, painting, project management $28,000 Materials Paints, primer, coatings, supplies $4,000
Surface Preparation Cleaning, repairs, priming $2,500
Equipment Lift rental, safety equipment $5,500
Transport & Parking Travel, parking fees $1,200
Insurance & Permits Liability, admin costs $1,800
Contingency Unexpected costs $1,000
This budget reflects the full scope of a large-scale, site-specific mural designed for long-term durability and strong visual impact. It includes concept development, professional materials, preparation, and safe installation. UV and anti-graffiti coatings ensure longevity.

214 of 336

Anne-Sophie Gaudet
Maintenance Guide Outline
This mural is designed for long-term durability using professional exterior materials and protective coatings. The following recommendations will help preserve its appearance and extend its lifespan.

Cleaning Recommendations
Routine cleaning should be gentle to avoid damaging the painted surface or protective coatings.
● Use soft cloths, sponges, or low-pressure water (garden hose or low PSI wash). ● Mild, non-abrasive soap may be used for general dirt or dust. ● Avoid high-pressure washing, harsh chemicals, or abrasive tools, as they may degrade the paint and coating layers.
● Graffiti or stains should be removed promptly using products compatible with the anti-graffiti coating applied to the mural.

Protective Coating & Reapplication
The mural will be sealed with a UV-protective and anti-graffiti coating to ensure longevity. ● It is recommended to reapply a protective coating every 5 years or as needed based on visible wear.
● Reapplication should be done by a professional familiar with mural conservation practices.

Color References for Future Touch-Ups
A record of all paint colors used (brand, color names, and/or custom mixes) will be provided to the City upon completion.
● Digital files and/or labeled samples can be supplied for accurate color matching. ● Due to natural weathering and UV exposure, slight color variation may occur over time; adjustments may be needed during touch-ups to ensure visual consistency.

Repairs & Touch-Ups
Minor touch-ups may be required over time due to environmental factors or accidental damage. ● It is recommended that repairs be performed by the original artist to maintain color accuracy, technique, and overall integrity of the design.

Artist Availability for Future Maintenance
The artist is available for future maintenance, repairs, or conservation work if desired by the City.

215 of 336

Artwork Title GOLDEN ENCOUNTER
90'

216 of 336

Artwork Title GOLDEN ENCOUNTER
This mural explores the idea that value is not given, but rather built through relationships. The composition presents a choral scene of diverse figures of different ages, ethnicities, and backgrounds who come together in a shared public space. Among the figures, gold nuggets are passed from hand to hand: a visual metaphor for what is created in the act of encountering one another: the idea that this precise moment, this precise place, is precious.

The composition is horizontal and fluid, designed to be read as a continuous narrative along the wall. There is no single protagonist. Groups of two, three, and four figures interact, share, listen, and observe, forming a constellation of encounters. A dedicated section shows children playing, representing the instinctive and spontaneous version of the same human need for connection that the adult figures express more consciously.

Each figure wears patterned garments inspired by diverse cultural traditions, that evoke the multicultural fabric of San Bruno without representing specific flags or symbols.

Centennial Plaza is a recently constructed public space, and this artwork celebrates that fact: the plaza itself is the physical manifestation of the conviction that people need places to meet. The gold nuggets are not abstract; they represent the result of coexistence in a shared space: a value that cannot exist in isolation.

The lower portion of the wall features flat fields of color (black and white) that serve as a compositional base, deliberately avoiding the area partially hidden by the planters at the base of the wall. The pergola and stage on the right side of the plaza are considered from different viewing angles: the figures on the far right are composed to be clearly visible from both the stage area and the street.

217 of 336

My name is Michelangelo Marra, I work under the name NSN997. I was born in the province of Naples in 1983 and have been based in Madrid since 2013. My practice is rooted in the belief that public space is the most democratic canvas available: it belongs to everyone, and it asks the artist to speak to everyone.

I am drawn to the Centennial Plaza project because it is not just a wall — it is a newly created civic space in the center of a diverse and growing community. San Bruno's population reflects the multilayered reality of contemporary California: multiple ethnicities, multiple generations, multiple languages. My work has always been about finding the visual language that speaks across those differences, not by erasing them, but by placing them in relationship with one another.

My current body of work, AURUM grows from a central question: where does value come from? My answer, developed across multiple murals in Europe and South America, is that value is relational. It cannot exist in isolation. The golden nuggets that appear in my compositions are a symbol of this: not wealth, but the thing that gets created when two people genuinely meet.

Centennial Plaza, as a public gathering space, is a physical embodiment of this principle.

Técnicamente, utilizo principalmente pintura en aerosol Montana MTN 94 para líneas y detalles, combinada con rodillo para grandes superficies de color. He realizado murales que cubren más de 13.000 pies cuadrados. Mi proceso es disciplinado y sistemático: transferencia del boceto a escala mediante cuadrícula, aplicación de la base, desarrollo de la figura, detalles y capas de patrones, y barniz mate resistente a los rayos UV. Trabajo con pulcritud y no dejo rastro alguno, salvo el propio mural.

Selected Institutional Collaborations
NSN997 has collaborated with municipal governments, universities, cultural institutions, and international festivals across 13 countries. A selection of relevant collaborations:
– Nova Lisbon University, Lisbon, Portugal (2023) — Commissioned mural "Livre e Igual" celebrating the 75th anniversary of the Universal Declaration of Human Rights.

Collaboration with university administration and student body. – Universidad Complutense, Madrid, Spain (2021) — Site-specific mural "Durmíamos Despertamos" developed in collaboration with the university's social engagement office. – Streetart for Rights Festival, Roma, Italy (2022) — Institutional collaboration with festival curators and local municipality for public space activation. – SAFE Festival, Hradec Králové, Czech Republic (2025) — Multi-stakeholder collaboration with festival directors and city cultural department. Mural "Encounters." – Detonarte 15, Mompiche, Ecuador (2026) — International commission in collaboration with local government and community organizations. Mural "Panta Rei." – LINK Festival, Brescia, Italy (2024) — Institutional commission, mural "I Wish a New World."

218 of 336

ENCOUNTERS SAFE festival
Hradec Králové, Czech Republic
589 ft2
1550 ft2
2025
PANTA REI Detonarte 15
Mompiche, Esmeralda - Ecuador
2026

219 of 336

I WISH

A NEW WORLD
LINK festival
Brescia, Italy
2024
1670 ft2

KNOWLEDGE BELONGS

TO EVERYONE
Artwalk Festival
Patras, Greece
20202400 ft2

220 of 336

LIVRE E IGUAL Nova Lisbon University
Lisbon, Portugal
2023
3100 ft2
1800 ft2
LIBROS LIBRES Compartiendo Muros
Madrid, Spain
2023

221 of 336

222 of 336

Wall Assessment
The Mural Wall at 474 San Mateo Avenue presents a stucco exterior surface in good condition (no known faults per project documentation). The wall faces south, receiving full California sun — a factor addressed in material selection. Existing landscaping along the wall base (ornamental grasses and flowering shrubs) creates a natural ground line; the mural composition is designed to avoid the bottom 18-24 inches of the wall to maintain this relationship and ensure paint integrity at the plant/ wall interface.

Wall Preparation
Technical inspection of surface on Day 1 (arrival September 7, pre-start). Spot priming of any porous or uneven zones with exterior-grade acrylic primer (Sherwin-Williams Loxon or equivalent, widely available in California).

Design Transfer
Scaled digital design (produced in Adobe Illustrator at 1:20 scale) transferred to wall via grid system at dawn/dusk to minimize heat distortion.

Painting Sequence
• Days 1–2 : Material procurement, equipment setup, technical wall inspection and surface assessment.
• Days 3–4: prime, base coat application, Design trasfer (full wall). • Days 5–7: Large field color blocking — gold yellow and grey zones via roller • Days 8–10: Figure development and pattern work via Montana MTN 94 spray. • Day 11: Detail layer, gold nugget accents, refinement and touch-ups. • Day 12 (Sep 19): UV matte varnish application (full wall, roller). Completion and sign-off. • Days 13–16 : Weather contingency buffer — 4 days reserved for adverse climate conditions, unexpected surface issues, or extended drying times.

Equipment
Articulating boom lift (40-ft reach minimum) — rented locally in San Bruno/South Bay. Positioned on plaza pavement, not on landscaping.

Extension poles and rollers (various nap for stucco texture) for mid-range areas.

Montana MTN 94 spray cans for detail work, Ladders (6ft and 10ft) for lower section access.

Site & Safety
• Pedestrian barricades positioned at minimum 6-foot perimeter around active work zone. • Signage indicating active mural installation, artist contact information. • OSHA-compliant fall protection equipment for all elevated work. • All paint materials stored off-site (artist vehicle/rental van) — no on-site storage per project requirements.
• Drop cloths protecting plaza pavement and landscaping during spray operations. Full daily cleanup.
• Parking: budget includes daily parking fees (~$10/space) for artist vehicle and boom lift equipment.

Installation & Safety Plan

223 of 336

The proposed total fee for the Centennial Plaza Mural is $44,256. This reflects the full scope of work including design development, surface preparation, materials, and equipment across 16 days on site: 2 days for material procurement and site setup, 10 active painting days, and 4 days reserved as weather contingency buffer. The budget is calibrated to the wall's complexity, the required durability standards, and NSN997's professional standing as an internationally exhibited muralist with 9 first-prize awards.

Artist Fee (design development + 16 days on site)
Assistant (1 person × 16 days)
Montana MTN 94 spray paint (approx. 80 cans)
Exterior acrylic latex — base coat, field colors (RAL equiv.) Primer (Sherwin-Williams Loxon or equiv.)
UV-resistant matte varnish — full wall application
Brushes, rollers, extension poles, tarps, drop cloths
Articulating boom lift rental (16 days)
Ladders, barricades, safety equipment
Round-trip flights (Madrid–San Francisco × 2 persons)
Accommodation (16 nights × 2 persons, San Bruno/South Bay) Parking (16 days, artist vehicle + equipment)
OSHA safety equipment rental
Insurance (general liability, project-specific)
Contingency (10%)

TOTAL PROPOSED FEE
$20,000
$6,400
$640
$1,800
$600
$1,200
$500
$4,000
$400
$2,800
$3,200
$320
$300
$800
$4,296
$44,256
All costs are estimates based on current market rates. The artist will provide itemized receipts for all expenditures. Any savings below estimated line items will be returned to the City or applied to contingency at City's discretion.

Fee details

224 of 336

Materials Used
• Paint: Montana MTN 94 spray (low-fade UV-resistant formula) • Paint: exterior acrylic latex (Behr Premium Plus Ultra or equivalent) for field areas. • Primer: Sherwin-Williams Loxon Exterior Masonry Primer or equivalent. • Final coating: UV-resistant matte clear varnish applied by roller over full wall surface.

Expected Lifespan
With proper maintenance, the mural is expected to retain visual integrity for a minimum of 10–15 years.

Cleaning Recommendations
Routine cleaning: gentle rinse with low-pressure water (no high-pressure washing directly on painted surface). Mild soap solution with soft brush for spot cleaning.

Avoid: solvents, bleach, or high-pressure washing on painted surfaces. Do not use harsh chemical cleaners near the mural base.

Varnish Reapplication Schedule
Year 10: Full surface assessment. Touch-up of any faded or chipped zones, followed by full UV varnish reapplication.

Color References for Touch-Ups
Black: RAL 9005 / Montana MTN 94 Black
Gold/Yellow: RAL 1004 / Montana MTN 94 Eldorado
Grey: RAL 7042 / Montana MTN 94 Rita Grey
White: RAL 9003 / Montana MTN 94 White
Maintenance Guide Outline

225 of 336

Centennial Mural

226 of 336

For the Centennial Mural in San Bruno, we were inspired by artists and innovators who have consistently pushed culture and sound forward. Together, these influences guided us toward a story of progress, resilience, and forward motion.

That sense of progress is expressed through the figures in the mural. One looks ahead, symbolizing growth and the drive toward what’s next. The musician looks back, reflecting on how far the culture has come and acknowledging that this progress exists because of those who came before—standing on the shoulders of giants.

Rough Edge Collective does not use AI in any part of our design process, we hire our models, and source props. We would love to further develop this concept and design, have the opportunity to collaborate with models and continue to add depth to this proposal. Thank you for your time and consideration.

-MJ & Joshua

227 of 336

Rough Edge Collective
www.themural-project.org
Joshua Lawyer
MJ Lindo-Lawyer
Letter of Interest
We are Rough Edge Collective: Maria-Jose (MJ) Lindo-Lawyer and Joshua Lawyer. Both of us were the art kids in school, obsessed with creating. We know firsthand how impactful public art can be. I (MJ) was born in Florida and moved frequently due to the civil war in Nicaragua, and my family eventually relocated to Toronto, Canada, where I was captivated by murals seen while riding the subway. Meanwhile, 2,600 miles away in East Palo Alto, Joshua was growing up immersed in a strong Tongan culture, rich in tradition. Although art was deeply woven into that culture, the idea of being an artist professionally was hard for his family to grasp. It was through the 1990s Bay Area street art scene—and seeing public spaces transformed—that Joshua found his life’s passion. We met in 2010 in a small gallery in San Francisco’s Mission District, fell in love, and the rest is history. For the next decade, we showed in galleries across the country, had work featured in Juxtapoz and American Art Collector, and exhibited at the de Young Museum.

Throughout our career, we’ve adapted to each project’s demands—from painting a 7,000-square-foot mural with Caltrans, to working with the DOT in Connecticut and collaborating with city municipalities, colleges, community organizations, and businesses. Regardless of project size, we work tirelessly to create designs that meet—and exceed— our clients' visions. We've never gone over budget and always meet installation deadlines. Our team has over 14 years of OSHA training, fall protection certification, and licenses to operate machinery such as scissor and boom lifts. We've also served on emergency response teams and have our C- 33 contractors license for painting and decorative painting.

At Rough Edge Collective, we bring extensive experience in fostering meaningful connections between communities, schools, and youth through collaborative art initiatives. Our recent projects have involved working closely with college communities to create dynamic works that resonate deeply with their unique lived experiences. Through group discussions, immersive workshops, and even incorporating students as models in our murals, we ensure that every piece of art is a true reflection of the voices and stories of those involved.

Our process is entirely collaborative, blending our individual skills, insights, and experiences to form a unified creative vision. From initial concept sketches to crafting props and photographing models, every stage is approached with intention and teamwork. We hand-build or source all of our props, source onsite locations to stage our own reference photoshoots, and use those images as the foundation for hand-drawn designs, each element infused with care and connection. We do not use AI in any part of our design process.

Our team member Joshua Lawyer grew up in the San Bruno area, having spent many Polynesian dance events preforming in the area as a child. We would love the opportunity to develop our initial mural concept further represent the San Bruno community.

We believe we would be a strong fit for the Centennial Plaza Mural, given our experience with the youth, collegiate communities and community centers. Over the years, our team has engaged with communities in a variety of meaningful ways, and we would welcome the opportunity to collaborate on developing an artistic concept together.

Warmly,
-MJ & Joshua

228 of 336

Rough Edge Collective
https://www.roughedgecollective.com
Joshua Lawyer
MJ Lindo-Lawyer
Cover sheet
▪ Response to ‘Centennial Plaza Mural’
▪ May 11th 2026
▪ Maria-Jose Lindo-Lawyer (Main Contact) and Joshua Lawyer of Rough Edge Collective Inc. ▪ Maria-Jose (MJ) Lindo, Artist/Co-Owner of Rough Edge Collective, https://www.r
oughedgecollective.com/
https://www.instagram.com/roughedgecollective/

229 of 336

Rough Edge Collective
www.themural-project.org
Joshua Lawyer
MJ Lindo-Lawyer
Letter of Interest
We are Rough Edge Collective: Maria-Jose (MJ) Lindo-Lawyer and Joshua Lawyer. Both of us were the art kids in school, obsessed with creating. We know firsthand how impactful public art can be. I (MJ) was born in Florida and moved frequently due to the civil war in Nicaragua, and my family eventually relocated to Toronto, Canada, where I was captivated by murals seen while riding the subway. Meanwhile, 2,600 miles away in East Palo Alto, Joshua was growing up immersed in a strong Tongan culture, rich in tradition. Although art was deeply woven into that culture, the idea of being an artist professionally was hard for his family to grasp. It was through the 1990s Bay Area street art scene—and seeing public spaces transformed—that Joshua found his life’s passion. We met in 2010 in a small gallery in San Francisco’s Mission District, fell in love, and the rest is history. For the next decade, we showed in galleries across the country, had work featured in Juxtapoz and American Art Collector, and exhibited at the de Young Museum.

Throughout our career, we’ve adapted to each project’s demands—from painting a 7,000-square-foot mural with Caltrans, to working with the DOT in Connecticut and collaborating with city municipalities, colleges, community organizations, and businesses. Regardless of project size, we work tirelessly to create designs that meet—and exceed— our clients' visions. We've never gone over budget and always meet installation deadlines. Our team has over 14 years of OSHA training, fall protection certification, and licenses to operate machinery such as scissor and boom lifts. We've also served on emergency response teams and have our C- 33 contractors license for painting and decorative painting.

At Rough Edge Collective, we bring extensive experience in fostering meaningful connections between communities, schools, and youth through collaborative art initiatives. Our recent projects have involved working closely with college communities to create dynamic works that resonate deeply with their unique lived experiences. Through group discussions, immersive workshops, and even incorporating students as models in our murals, we ensure that every piece of art is a true reflection of the voices and stories of those involved.

Our process is entirely collaborative, blending our individual skills, insights, and experiences to form a unified creative vision. From initial concept sketches to crafting props and photographing models, every stage is approached with intention and teamwork. We hand-build or source all of our props, source onsite locations to stage our own reference photoshoots, and use those images as the foundation for hand-drawn designs, each element infused with care and connection. We do not use AI in any part of our design process.

Our team member Joshua Lawyer grew up in the San Bruno area, having spent many Polynesian dance events preforming in the area as a child. We would love the opportunity to develop our initial mural concept further represent the San Bruno community.

We believe we would be a strong fit for the Centennial Plaza Mural, given our experience with the youth, collegiate communities and community centers. Over the years, our team has engaged with communities in a variety of meaningful ways, and we would welcome the opportunity to collaborate on developing an artistic concept together.

Warmly,
-MJ & Joshua

230 of 336

231 of 336

Portfolio

1. ‘ On These Grounds We Walk’ - “On These Grounds We Walk” is a reflection on the transformative space that NC State cultivates—particularly through its dedication to CHASS . At its core, this work speaks to the power of abstract thought as the foundation of our human capacity to create, explore, and uncover the unknown. While the impulse to transform our environment through discovery may be innate, it is only through the right tools and disciplines that we can unearth new worlds—worlds rich with freedom, stimulation, and a deeper sense of fulfillment. It was our goal to depict this journey of transformation. Located in Raliegh, North Carolina at Caldwell Lounge at NC State. 2025 $42,000 15 x 50 feet , Mural painted using several layers of exterior house paint, rollers and brushes.

232 of 336

2. ‘Grounds to Grow’ – Commissioned by CalPoly San Luis Obispo – 2025 – San Luis Obispo, California. , 30’x60’. Mural painted using several layers of exterior house paint, rollers and brushes. $26,000 "Grounds to Grow" was designed to capture the intricate ecosystem of a college campus—an environment that nurtures personal and intellectual growth. We sought to portray the dynamic relationship between an eclectic array of plants and pollinators, symbolizing the diverse backgrounds of students and staff. This diversity, much like the flora, creates a vibrant space where individuals can thrive, and in turn, enhance the collective culture of the campus.

233 of 336

3. Chapter One – Commissioned by the Santa Rosa Junior College , September 2023 - located in Santa Rosa , 30’x60’. Mural painted using several layers of exterior house paint, rollers and brushes. $ 30,000

234 of 336

4.Arms of Mine – Commissioned by Sprocket Mural Works for the Hall Manor Revitalization Program. Installed in Harrisburg, Pennsylvania. Mural painted using several layers of exterior house paint, rollers and brushes. 20 25 feet. 2025

235 of 336

5.In 2020 we worked with the Tualatin Historical Society, Tigard Historical Association, and the Washington County Museum to develop a mural for the Tigard Outdoor Museum to honor and paint a mural of the Tualatin Kalapuyan indigenous people of Tigard, Oregon and surrounding areas. It was a project we were honored to have been invited to participate in. Mural painted using several layers of exterior house paint, rollers and brushes. $35,000 20 x 75 feet

236 of 336

6. Shady Oak, 15 x 30 feet. Mural painted using several layers of exterior house paint, rollers and brushes. 2021 , Santa Rosa, California. Private Commission for Shady Oak Barrel House.

237 of 336

7. Warming Up – Commissioned by VOLZ Company and Napa Valley College. 2024. Located in Napa, California. ural painted using several layers of exterior house paint, rollers and brushes. $25,000 20 x 75 feet

238 of 336

8. Building Upon, 6400 sqft, Mural painted using several layers of exterior house paint, rollers and brushes. 2023, Salinas, California. Commissioned by City of Salinas and Monterey Arts Council. ‘ Working Towards is one part of the 6 wall project representing the story of the working mothers making sacrifices for their children, and then the children build upon the sacrifices their parents made for them.

239 of 336

9. Working Towards, 6400 sqft, Mural painted using several layers of exterior house paint, rollers and brushes. 2023, Salinas, California. Commissioned by City of Salinas and Monterey Arts Council. ‘ Working Towards is one part of the 6 wall project representing the story of the working mothers making sacrifices for their children.

240 of 336

10.Outlet, 25 x 60 feet, Mural painted using several layers of exterior house paint, rollers and brushes. 2023, Seattle, Washington – Commissioned by 206 Zulu, City of Seattle and Downtown Association. ‘ Outlet’ is a design based on community and youth workshops for the Downtown Seattle Community.

241 of 336

242 of 336

Rough Edge Collective
www.themural-project.org
Joshua Lawyer
MJ Lindo-Lawyer
Installation Plan

Throughout our career, we’ve adapted to each project’s demands—from painting a 7,000-square-foot mural with Caltrans, to working with the DOT in Connecticut and collaborating with city municipalities, colleges, community organizations, and businesses. Regardless of project size, we work tirelessly to create designs that meet—and exceed— our clients' visions. We've never gone over budget and always meet installation deadlines. Our team has over 14 years of OSHA training, fall protection certification, and licenses to operate machinery such as scissor and boom lifts. We've also served on emergency response teams and have our C- 33 contractors license for painting and decorative painting.

Once the design process is complete, we prioritize safety throughout the installation process. If the wall requires any preparation, that becomes our first step to ensure the perfect surface for the mural. Because we use a hand-painted mural style, we carefully tape off all surrounding areas to protect them from paint and assess the location in advance for any potential lift access or site-related challenges.

From there, we project or grid the design onto the wall, and the painting begins. Throughout every stage of installation, safety remains our top priority.

Warmly,
-MJ & Joshua

243 of 336

Rough Edge Collective
MJ Lindo-Lawyer
Joshua Lawyer
www.roughedgecollective.com
Proposed Budget
San Bruno Mural
Item Unit Quantity Rate Subtotal Description
Artist Fee Lump Sum --- ($ 5,000.00 ) ($ 5,000.00 ) Conceptualization and design Materials & Supplies and Maintenance Lump Sum --- ($ 2,500.00 ) ($ 2,500.00 ) Paints, brushes, sealants, masking Equipment Rental Day 1 ($ 2,500.00 ) ($ 2,500.00 ) Scaffolding and/or lifts for implementation Fabrication 1 ($ -  )
Installation Square Feet 1060 ($ 16.00 ) ($ 16,960.00 ) Mural execution Travel Lump Sum --- ($ 1,500.00 ) ($ 1,500.00 ) Transportation and lodging costs Community Engagement Lump Sum --- ($ -  ) ($ -  ) Materials/stipend for expanded workshops and/or mentorship Project Management/Administration Lump Sum --- ($ 1,000.00 ) ($ 1,000.00 ) Coordination, reporting, documentation Contingency Percentage 0.10 ($ 2,946.00 ) Allowance for unforeseen expenses Total Project Costs ($ 32,406.00 )
All costs are estimated based on the project’s current scope, timeline, and site conditions. Artist maintains active general liability insurance and adheres to all applicable permitting and compliance requirements.

Pricing may be adjusted if there are substantive changes to the scope of work, scheduling, or site conditions.

244 of 336

Mural Maintenance Plan for a Mural Painted on Masonry

1. Initial Assessment and Documentation
• Date of Completion: June/July 2023 with mural extension added in March 2024 • Materials Used: Vandal guard and Kelly Moore Paint that has since closed but can be substituted for Sherwin Willaims and Nova Paint.

2. Cleaning and Touch-ups
• Surface Cleaning (Frequency: Annually or as needed):
o Dry Dusting: Use a soft-bristle brush or vacuum with a brush attachment to gently remove dust, spider webs, and loose debris from the surface of the mural.
o Wet Cleaning: If required, use a damp (not soaking) soft cloth or sponge with water and a mild, pH-neutral soap to wipe the surface. Avoid harsh chemicals that can damage the paint.
o Masonry Surface Cleaning: For masonry areas that aren't painted, use a soft-bristled brush to remove dirt and debris. If needed, apply a masonry cleaner suitable for the surface type.
• Spot Cleaning (As needed): If there are any small stains, use a gentle cleaning solution specifically designed for art and masonry. Test on an inconspicuous area first to ensure it won’t cause damage to the paint.
• Touch-ups: If the mural shows signs of wear such as chipping or fading, consult Rough Edge Collective first for daily rate, if unavailable hire a professional conservator to determine the best way to touch up or repaint sections. Use matching colors and appropriate paint for the surface.

3.Preventing Further Damage
o Repainting Sealer: If the mural was originally painted with a matte or gloss finish, check periodically to ensure the sealer is still intact and reapply if necessary.

245 of 336

• Vandalism Prevention:
o Protective Coating: Apply an anti-graffiti coating that makes it easier to remove graffiti without damaging the mural. These coatings often allow for the safe removal of spray paint or markers.
o Security Measures: If vandalism is a concern, consider installing security cameras or lighting to discourage damage.

4.Professional Assessment (Every 5- 10 Years)
• Consultation with Conservation Experts: Every few years, invite a mural conservator or art restoration professional to inspect the mural. They can provide an expert opinion on whether any major conservation or preservation work is needed and help address any advanced issues.

7. Emergency Maintenance Plan
• In Case of Damage (Vandalism, Natural Disasters, etc.):
o Immediate Actions: In the event of significant damage (e.g., graffiti, severe weather, accidents), assess the extent of the damage and take photos for insurance purposes.
o Consult Professional Help: For major repairs or restoration, contact Rough Edge Collective first for daily rate, if not available, contact an art conservator or professional muralist immediately.

246 of 336

Concept Design | Sketch
San Bruno Centennial Plaza Mural rymiestudio.com | @rymie “Familiar Energy”
Have you ever had a memory of a place you've never been? Not a real memory — something closer to a feeling. You hear a song, someone tells a story, and suddenly you know that room, that street, that crowd.

The energy is ingrained. Like flipping through a stranger's yearbook and feeling the weight of a summer you never lived.

This mural lives in that space. The scenes of music, kids playing, adults dancing, and gathering painted across Centennial Plaza are not documentary. They are felt. Abstracted, layered, painterly; drawn from the universal language of bodies in motion and sound moving through open air. Laughter on a playground.

Some of these moments can become more specific to San Bruno. Some just belong to everyone. The line between the two is exactly where this work lives.

247 of 336

5’ 5” 6’ 78’ 7”
Site Mockup
Proposed Color Palette
*6 colors sourced from existing studio inventory — same product and brand.

248 of 336

Artist Statement
Lauren Rymer (Rymie) | | rymiestudio.com
I'm drawn to San Bruno's Centennial Plaza project because it represents something increasingly rare: a real town square. Not a metaphorical one, not a simulated one. An actual place where people gather, sit, listen, and exist together in the same physical space. That matters to me right now, not as a talking point but as a felt response to the world we're living in. Modernity has made us efficient and isolated in equal measure. The patterns of daily life include commuting, scrolling, binge watching, ordering in, logging on, tune out… our tech has dismantled the informal rituals of community that once held neighborhoods together. The town square used to be a given. Now it has to be intentional. So let's make this one stop you in your tracks.

I make public art because I believe a painted wall can change how people relate to a place.

I've seen it happen, in a hospital corridor in Richmond, on a sanitation truck in Queens, on a brewery wall in Oakland, on a city street corner during lockdown. When a space has a visual identity that reflects something true about the people who use it, they slow down. They look.

Sometimes they stay and have a conversation with a stranger.

My process starts with the place itself. Its geometry, its light, its existing elements and adjacencies. For Centennial Plaza I'm thinking first about the stage, the landscaping, the wide horizontal sweep of the wall, and how a person experiences it moving through the space versus standing still. I work in exterior paint on a range of surfaces and bring my own equipment, scaffolding, and projection tools to every job. I collaborate fluidly with facilities teams, city staff, and stakeholders. I've navigated multi-round approvals, tight installation windows, and institutional constraints without compromising the work.

I want to look back on my career and say the murals I painted helped people make sense of the challenges of their time. One of the biggest challenges of our time is finding our way back to each other. The investment in Centennial Plaza is already doing that work. I'd love to be part of it.
- Rymie

249 of 336

PAST WORK SAMPLES
+ Collaboration Details
rymiestudio.com | @rymie
Title: RICHMOND CARES | Year: 2026 | Location: Richmond Hospital | Client : Theophilus Little - Kaiser Permanete | Size 42ft X 9ft | Lead Artist Title: EXTRA LIFE GAMEROOM | Year: 2025 | Location: Oakland Headquarters | Client : Isabel Aleman - Credit Karma | Size 34ft X 15ft Main Lobby mural celebrating Richmond's Black and Brown community through historical and contemporary figures . Rymie channeled the spirit of the community and the hospital's legacy of innovation and care. Commissioned by Theophilus Little -Support Services Administrative Officer, Rymie coordinated with facilities and hospital administration throughout & had a glowing review from the staff upon completion.

Floor-to-ceiling arcade mural wrapping the game room at Credit Karma's Oakland HQ. Design draws from 90s gaming visual language — pixel typography, power-up iconography, comic-book layouts — remixed through a contemporary lens with bold flat color and original characters.

Developed over several months through an iterative approval process with the corporate brand and facilities teams; installation executed within a five- day window during summer staff recess, navigating building security protocols and restricted access hours.

Temescal Brewery Client: Sam Gilbert | 2023 | Oakland, CA | 2024 Dimensions: 200 sq ft | Exterior latex on masonry | Lead artist Exterior mural transforming a side entrance on the brewery's Oakland facade. Design incorporates architectural elements of the doorway — arched frame, threshold — into a vibrant scene of botanicals, vessels, and warm light. Site-responsive approach integrating existing building features into the composition.

Local Bay Area commission on exterior masonry surface.

1. 2. 3.

250 of 336

Title: SMOKE MOTHER | Year: 2019 | Location: Bushwhick NYC | Client Dearest Creative - Arrogant Swine | Size 45ft X 18ft | Exterior - Element Guard NYC Trucks of Art - Queens Sanitation Vehicle Client: NYC Department of Sanitation | 2022 Dimensions: Full 360, 46,000lb collection vehicle | Lead artist Selected for DSNY's Trucks of Art program only 5 artists a year, a zero-waste public art initiative transforming sanitation vehicles into roving public artworks. Design celebrates QUEENS — the energy and essential spirit of NYC sanitation workers. Executed over 7 days with one assistant using reclaimed paint — a material constraint that required precise planning and adaptability. Municipal commission coordinated directly with DSNY program staff . This mural was completed inside the main DSNY Garage alongside fellow artists & wonderful DSNY mechanics.

Rockaway Brewing Co. + LIC Placemaking Mural
Client: Rockaway Brewing Co. / Street Plans / Long Island Board of Realtors | Long Island City, Queens, NY | 2020+ 2021 | Dimensions: 560 sq ft exterior facade + 573 sq ft asphalt: 1133 sqft total Two-phase public art project anchored at the Plaxall Arts Complex in LIC. Phase one: exterior facade mural for Rockaway Brewing Co., Queens' first craft brewery, drawing on the brand's surf culture and connection to the natural world through a bold graphic grid. Phase two: placemaking collaboration with urban design firm Street Plans, funded by a national grant, extending the mural's visual language into a reclaimed curb lane — transforming the intersection into a public street seat and neighborhood respite. Coordinated across three client stakeholders including a municipal planning firm and a grant-funded civic initiative.

Exterior mural on a high-visibility wall shared with work by Jerkface in Bushwick's arts corridor. A meditating figure surrounded by wild boars, botanicals, and smoke — a dreamlike scene rooted in ritual and nature. Commissioned through Dearest Creative, a Brooklyn-based women- owned studio; collaborative concept development with creative director and venue client.

4. 5.

6. 251 of 336

THANK YOU FOR YOUR CONSIDERATION
Future Ventures — Live Portrait Commission Client: Future Ventures / Empire 7 Productions | San Francisco, CA | 2024 Medium: Hand-drawn illustration | Lead artist
Commissioned to create 75+ individual portraits of founders, funders, and industry leaders for Future Ventures' annual summit at Salesforce Tower. Each portrait placed its subject within iconic SF landmarks. Combination of advance work and live on-site illustration during the event. High-stakes private commission requiring consistent quality output under time pressure with a discerning clientele.

Across these projects, I've navigated multi-stakeholder approvals, institutional timelines, grant-funded civic initiatives, and high-visibility public commissions from New York to the Bay Area. I work collaboratively by default — with brand teams, facilities managers, urban planners, city agencies, and community members — and I bring the same transparency and responsiveness to every client relationship regardless of scale.

I'm ready to bring that experience to Centennial Plaza.

7. 8.

9. Equator Coffees — Super Bloom Collection Client: Equator Coffees | Bay Area, CA | 2023 Medium:

Illustration, packaging design | Lead artist
Limited-edition spring collection including coffee bag, enamel pin, and tumbler built around a cohesive illustrated world celebrating seasonal bloom and regenerative agriculture. A portion of proceeds supported a Regenerative Organic Certified producer partner. The collection won a Sprudge Design Award for Best Collaboration.
2026 Update : A second collaboration is currently underway, expanding the partnership to include new packaging, a Nalgene water bottle, and a mural commission for Equator's upcoming Orinda café.

10.Movida Client: Bobby Marhamat, Movida SF | 555 2nd Street, South Beach, San Francisco, CA | 2023 Dimensions: approx. 300 sq ft | Exterior latex on wood siding and masonry | Lead artist
Commissioned as a temporary exterior mural during pre-opening construction, this piece wrapped an architecturally complex facade including a recessed entryway, corner column, and multi-surface materials. The design incorporated the client's brand identity — Movida, a Persian-Mexican fusion concept — through abstract graphic forms suggesting movement, cocktail culture, and bold color. Painted over upon completion of the permanent facade.

Selected by Delta Air Lines for a live illustration activation at the ADCOLOR conference in downtown LA. Created up to 45 custom travel-themed illustrations over three consecutive days, each completed within 30 minutes live on-site.

Five illustrations selected as hero assets for Delta's social media and digital campaign. High-output commission requiring consistent quality under real-time public pressure for a global brand audience.

Delta Air Lines — ADCOLOR Campaign Illustration Client: Delta Air Lines / ADCOLOR | Los Angeles, CA | 2023 Medium: Digital illustration | Lead artist

252 of 336

RYMIE | Lauren Rymer
Preferred Name: Rymie | she/they
| rymiestudio.com | @rymie
Current Role
Freelance Illustrator and Muralist | 2020–Present
Bay Area-based artist specializing in large-scale murals, public art installations, and commercial illustration. Operating as Rymie Studio out of Emeryville, CA.

Public Art & Exterior Murals
Kaiser Permanente Richmond — Main Hallway Mural | Richmond, CA | 2026 Large-scale institutional mural in high-traffic healthcare corridor. Commissioned by Kaiser Permanente; coordinated with facilities and hospital administration.

NYC Department of Sanitation — Trucks of Art Program | Queens, NY | 2022 Designed and painted municipal sanitation truck (800 sq ft) for citywide zero-waste public art initiative. Municipal commission coordinated directly with DSNY program staff.

Street Plans / Rockaway Brewing Co. — LIC Street Seat | Long Island City, NY | 2021 Exterior facade mural (560 sq ft) + asphalt street installation (573 sq ft) as part of grant-funded tactical urbanism project.

Coordinated across three stakeholders including urban design firm and civic initiative.

Additional Mural & Public Art Work
• Temescal Brewing Co., Oakland, CA | 200 sq ft exterior masonry | 2024 • Movida SF, South Beach, San Francisco, CA | 300 sq ft exterior, temporary | 2023 • Credit Karma, Oakland, CA | 486 sq ft interior | 2022 • Smoke Mother / Arrogant Swine, Bushwick, Brooklyn, NY | 750 sq ft exterior | 2019 • Personal and commissioned murals throughout the Bay Area and New York | 2018–present Selected Commercial Clients
Delta Air Lines, Apple, Radical Media, JW Marriott, Vox Media, Brooks Running, Rough Trade, Equator Coffees, Scientific American, Harvard Journal, Eater, SAP, Penguin Random House, Credit Karma, Kaiser Permanente, Future Ventures Professional Experience
Design Director | Rockaway Brewing Co. | 2018–2021
Complete brand identity, packaging, merchandise, signage, and social media utilizing advanced illustration and production techniques.

Graphic Designer | Revolver NYC | 2017–2018
Brand identity development for diverse organizations using illustration for logos, maps, and signage.

Graphic Designer & Press Manager | Park Slope Letterpress | 2015–2017 Lead creative on custom stationery design; managed production schedules and studio inventory.

Education
BFA, Communications Design | Pratt Institute | 2009–2013 Professional References
Lillian Lam | Visual Communications Lead, NYC Department of Sanitation | Project: Trucks of Art 2022
Theophilus Little | Support Services Administrative Officer, Kaiser Permanente Richmond | | Project: Kaiser Richmond Main Hallway Mural 2025

253 of 336

Installation & Safety Plan
Lauren Rymer (Rymie) | Centennial Plaza Mural | 474 San Mateo Avenue, San Bruno, CA Phase Workflow | Sept 8–28, 2026
• Phase 1 — Surface Prep (1 day): Pressure wash full wall surface, allow to dry completely. Tape off edges, windows, doors, and adjacent surfaces.
• Phase 2 — Prime (1-2 days): Apply Loxon masonry primer via airless sprayer across full 1,060 sq ft surface.

Tinted base coat applied to reduce paint coverage required. • Phase 3 — Design Transfer (1 night, ~4 hrs): Project final design onto primed wall using portable battery- powered projector. Grid method used as backup can happen on first paint day. Electrical access to be coordinated with City upon award.
• Phase 4 — Painting (14 days): Benjamin Moore Element Guard exterior paint, 6-color palette. Background to foreground, right to left. Painting assistant on site approximately 7 day. • Phase 5 — Refinement (2 days): Detail work, edge cleanup, and quality review. • Phase 6 — Seal (1–2 days): Full topcoat application of Mural Guard UV/anti-graffiti coating (Rainguard) via airless sprayer. Completion before September 30 deadline.

Equipment
• JLG 30–33 ft electric articulating boom lift (zero emissions): Positioned on plaza hardscape; articulating arm reaches over planted buffer zone along wall base without disturbing landscaping. Required approximately 5 days.
• Baker scaffold and 12 ft ladder: Used for mid-height sections and extended lateral runs, paint station away from pedestrians.
• Airless sprayer: Rental for prime and topcoat phases only. This isn’t a must have if the city prefers rolling primer that can be done but will require more time.
• Boom lift overnight storage: Option A — coordinate with adjacent private parking lot (lift needed approx. 1 week only). Option B — secure in plaza nightly, roped off and covered. • Electrical access (for boom lift charging): To be coordinated with City upon award. Plaza infrastructure assumed to support based on existing stage/amplification use.

Existing Site Conditions
• Landscaping runs approximately 3–4 ft along base of mural wall. Drop cloths will protect all plantings during priming, painting, and sealing. Equipment positioned on hardscape only. • Stage structure sits mid-plaza and partially interrupts sightline to right wall section depending on viewing angle — accounted for in design.
• Rear parking lot provides close vehicle access for supply transport and daily van parking.

Pedestrian Safety & Site Management
• Work zone clearly delineated with safety cones, barricades, and signage to guide pedestrians safely around active installation area.
• Supplies and materials consolidated using carts and work van — plaza stage may be utilized as a staging area if available and approved by City.
• Artist maintains awareness of scheduled plaza events throughout install period; work paused as needed during community programming.
• One Love Cafe (486 San Mateo Ave) utilized for water and restroom access during working hours or alternatively public restroom up the road..

OSHA Compliance
• All work conducted in compliance with OSHA standards for elevated work platforms and aerial lifts. Artist holds current general liability insurance (Rymie Studio / Next Insurance); City of San Bruno will be listed as additional insured.
• Artist responsible for all surface damage repair and site cleanup throughout installation period.

254 of 336

255 of 336

Maintenance Guide Outline
Lauren Rymer (Rymie) | Centennial Plaza Mural | 474 San Mateo Avenue, San Bruno, CA Protective Coating
The mural will be finished with Mural Guard by Rainguard a two-component, high-performance, zero-VOC, water- based aliphatic polyurethane varnish with IsoFree® Technology. Mural Guard provides long-term protection against UV exposure, harsh weather, corrosion, graffiti, and chemical and abrasion damage. It is environmentally safe and odorless upon application.
• Reapplication schedule: Inspect coating annually. Reapply Mural Guard topcoat every 5–7 years, or sooner if UV degradation, chalking, or loss of sheen is observed. Full recoat typically requires 1/2-1 day. • Surface prep for recoat: Clean wall thoroughly, allow to dry fully, lightly abrade if needed for adhesion, apply fresh two-component Mural Guard per manufacturer TDS.

Routine Cleaning
• General cleaning: Wash mural surface with mild soap and water using a soft brush or cloth. Rinse thoroughly. Avoid high-pressure washing directly on painted surface. • Frequency: Light cleaning recommended 1–2 times per year, or as needed following heavy weather events or community gatherings.

Graffiti Removal
• Once Mural Guard coating has fully cured, graffiti can be removed using VandlClean Super (Rainguard), acetone, lacquer thinner, or paint thinner. Apply per manufacturer TDS instructions. • Address graffiti promptly — early removal minimizes risk of damage to underlying paint layers. • If graffiti penetrates through the topcoat to the paint layer, contact artist for touch-up assessment before attempting removal.

Color References for Touch-Ups
• All paint colors used in this mural are Benjamin Moore Element Guard exterior paint. Exact color names and numbers will be provided to the City in a separate color reference document upon project completion. Any left over paint can also be provided if the city has a need/ want to store it. • Touch-up paint should be sourced from Benjamin Moore to ensure color and finish consistency. Artist recommends against substituting brands or finish types.

Artist Availability for Future Repairs & Maintenance
Lauren Rymer (Rymie) is available and willing to be contracted for future repairs, touch-ups, and maintenance assessments. The artist will conduct a complimentary check-in with the City every 6 months following mural completion to assess condition and identify any maintenance needs. • Hourly rate for repair work: $200/hr
• Minimum fee per repair visit: $400 (2-hour minimum)
• Materials and equipment: Reimbursed at cost in addition to hourly rate. • Travel: Artist is Bay Area based; no travel or lodging costs anticipated for this location. • Scheduling: Repair visits subject to artist availability; minimum 2 weeks advance notice requested for non- urgent work.

256 of 336

Concept Sketch
Concept Narrative
Title: Helping Hands
This design highlights how community driven e
This design highlights how community driven efforts are key to the preservation of nature and connection. The imagery of hands weave throughout the mural, highlighting the relationship between people and nature. Each scene brings focus to a plant or species native to the San Bruno area, and which is dependent on human collaboration for its survival. The colors in this mural tie into the existing tables and seats scattered throughout the plaza. Long bands of color stripes mirror the rectangular stones on the plaza floor. I really wanted to emphasize the surrounding beauty in the San Bruno region and play with colors to create a harmonious and uplifting tone. By highlight- ing nature I am setting a tone of harmon
ing nature I am setting a tone of harmony, stability and connection, all elements I believe are essential to creating peaceful spaces. Geo- metric shapes in the mural mirror the shapes of poppies, colors move back and forth creating a sense of continuity. I specifically highlight the Elfin butterfly, the Spotted Towhee, the California Quail, the California Poppy and Stone-crop flowers; all native to San Bruno moun- tain. This mural highlights the efforts that are being made to ensure the survival of these species habitat. The center of the mural dis- plays a young woman pondering a elfin butterfly. The San Bruno elfin is a U.S. federally listed endangered subspecies endemic to Cali fornia and is restricted to a few small populations, the largest of which occurs on San Bruno Mountain. You can see the Stone-crop flow- ers placed throughout the mural, in a large singular panel and behind the young girl. These flowers play a critical role to the butterfly as they provide food and safety for butterfly larvae and eggs. The hand on the right side of the mural holds a small bloom from the Lessingia germanorum, a rare species of flowering plant in the family Asteraceae known by the common name San Francisco lessingia.

It is endemic to California, where it is known from four populations in the Presidio of San Francisco and one occurrence on San Bruno Mountain. It too is listed as a federally endangered species. The birds are but two of myriad birds local to the region. Their presence in the mural bring a sense of light and joy, and remind us of our duty to steward our surroundings to ensure the safety of ourselves and all creatures. My hope is that this mural inspires through its beauty and informs through its content.

257 of 336

258 of 336

Previous Mural Examples

In Order of Presentation

¨Yuba Community College Theater Building
¨Redding California Stress Ribbon Bridge
¨Reno, NV Public Safety Building
¨24 hr. Mural Marathon
Selected by a juried panel to design and paint a 27’ x
72’ mural which wraps around the curving façade of
the Theater Building at Yuba College. Working with a
selected committee I created a design to highlight the
achievement of the multiple college programs while
also incorporating the school colors. In addition, she
worked with student volunteers who assisted with the
painting of the mural.

259 of 336

Awarded winner of the Stress Ribbon Bridge Mural Project by The City of Redding California.

This is the largest public artwork to be created for the city of Redding since the Sun Dial Bridge.

The mural accompanies a large site- specific sculpture that emphasizes the concept of infinity and brings focus to the natural beauty surrounding the Sacramento River. Rebecca designed this eight (8)-piece panel mural, painted along the abutments and upper entry points of the bridge during the summer of 2022.

260 of 336

\

Selected by a juried panel through the Reno Arts Council, Rebecca was chosen to design and install three large panels measuring 6 x 6’ and 6 x 8’ scale panel paintings for the newly designed Public Safety Center in Reno Nevada. Community engagement was encouraged throughout the design process to create artwork that reflected imagery that was important to the local community.

Selected by a juried panel, Rebecca
was one of five artists selected to paint
a 21’ x 21’ Panel for the Yuba Sutter
Theater Arts Building. The entire mural
was completed in 48 hours. This design
depicted a large Blue Heron and was
dedicated to the protection on water and
wetlands.

261 of 336

262 of 336

Workflow Outline

The wall will be primed with basecoat acrylic white primer. Primer will be applied using cordless sprayer. The stucco surface of wall will require more paint than standard wall.

The artist will use Nova Color Paints as well as premium quality UV protected exterior paint. Paint will be applied using a cordless sprayer, rollers and brushes. All paints used will be properly stored away when not in use. All waste materials will be properly discarded.

Artist will require access to electrical outlets and mural site at night at the start of the mural for nighttime projection for approximately 2 days.

The installation of the mural is estimated to take a total of approximately 24 days. If there are extenuating weather circumstances, the timeline may need to be adjusted.

During installation, to avoid damaging existing landscaping an extending lift will be used where needed including hard hat and safety harnesses. While in use, artist will maintain OSHA safety compliance with all proper safety wear. The lift will remain parked to the side of the plaza out of the way of pedestrian traffic while not in use or where otherwise instructed by the city of San Bruno. During installation, the area will be marked with caution tape and cones to prevent pedestrian traffic from entering workspace.

The artist will be insured at all times during the installation of the mural.

Moveable rolling scaffolding will be used in areas that are free of shrubbery and allows access to wall. This will be used around the existing gazebo structure.

Once completed the mural will be varnished with UV protective Sheer-coat varnish. A total of 4 coats will be applied to ensure the longevity and quality of the product.

Timeline

Week One
Wal prep/ Basecoat Primer
Mural Projection
Begin Painting first 20 feet

Week Two
Begin Painting next 40-foot segment

Week Three
Complete final 30-foot segment

Final Week
Application of Varnish/ Touch up applicable areas

263 of 336

264 of 336

Action plan for ongoing maintenance of public art

• Annual Inspection of mural, to include light cleaning of mural, with removal of dirt, dust, and cobwebs.

• The artist would request the right of first refusal on all repairs.

In the event of such a case, the artist would require an hourly rate of $75 an hour along with any travel expenses, equipment rentals and material fees deemed necessary.

• The protective varnish layer should not require modification, but it is recommended that a coat of varnish be reapplied after 5 years to extend longevity.

In the case that the mural is damaged by graffiti, it is recommended that the graffiti be removed using the Sheer-coat Cleverclean. Both the varnish and the cleaning product can be found at Precita Eyes in San Francisco.

Product specs can be found at
https://www.precitaeyes.org/uploads/1/0/7/4/107469011/store- sheercoat.pdf

If Cleverclean is used, it is recommended that the cleaning is followed by a touch-up layer of Sheer-coat varnish.

265 of 336

266 of 336 ATTACHMENT 3

267 of 336

City Council Agenda Item
Staff Report

CITY OF SAN BRUNO
DATE: August 25, 2026
TO: Honorable Mayor and Members of the City Council
FROM: Alex D. McIntyre, City Manager
PREPARED BY: Matthew Lee, P.E., Public Works Director
Ana Morales, Management Analyst
SUBJECT: Consider Adoption of a Resolution Authorizing the City Manager to Execute a Services Agreement with Recology San Bruno for Illegal Dumping Collection Services on Caltrans-Owned Property in an Amount Not to Exceed $200,000 for a One-Year Term and Determining the Project is Exempt Under the California Environmental Quality Act BACKGROUND:

In Fiscal Year 2025-26, the City Council identified litter and illegal dumping as a priority and initiated the Clean-Up San Bruno Initiative (Initiative) as a coordinated, multi-departmental effort focused on abatement, prevention, enforcement, public education, and interagency coordination. The Initiative was created in response to recurring illegal dumping at City of San Bruno (City) and non-City-owned locations, including the California Department of Transportation (Caltrans)-owned property, where jurisdictional boundaries and access requirements oftentimes delay removal and create visible impacts to surrounding neighborhoods and commercial corridors.

The Initiative budget included dedicated funding for abatement services. As part of the Initiative, the City has worked with Caltrans and Recology San Bruno (Recology) to improve response at recurring locations on Caltrans-owned property.

The City and Recology are parties to an Amended and Restated Solid Waste Collection Services Agreement, effective January 1, 2023, as subsequently amended (Franchise Agreement). The Franchise Agreement requires Recology to provide an abandoned waste and illegal dumping program on City property and within City rights-of-way. It does not require Recology to provide those services on Caltrans-owned property. A separate agreement is therefore needed for the City to procure these additional services.

In November 2025, Caltrans issued the City an encroachment permit authorizing the removal and collection of garbage and debris from designated Caltrans-owned properties within San Bruno. Recology is identified as an authorized contractor under the permit. As the Initiative continues, the City will continue to comply with all applicable permit requirements and obtain any necessary extensions, renewals, or successor authorizations to ensure uninterrupted lawful access throughout the term of the proposed agreement.
268 of 336 Item 5j.

Honorable Mayor and Members of the City Council
August 25, 2026

Page 2 of 3 ends

DISCUSSION:

The proposed services agreement (Agreement) is a separate Initiative-funded agreement and does not amend the Franchise Agreement or expand the services funded through solid waste customer rates.

Proposed Services
The agreement establishes a dedicated and predictable service level for 13 designated Caltrans hotspots located along and near I-380, El Camino Real, Skyline Boulevard, the I-280 access roads, and the Crestmoor Drive overpass. Key service requirements include:
A single crew consisting of two workers and two vehicles, including one flatbed truck and one rear-loader.
Inspection of each designated hotspot once each workday, Monday through Friday, with reasonable good-faith efforts to remove observed abandoned waste by the end of the same day.
Response to complaints and reasonable good-faith efforts to remove qualifying abandoned waste by the end of the next workday.
Daily monitoring and documentation through the San Bruno Responds platform, including logging completed collections.
Transportation of collected material to the transfer station and lawful disposal.

The proposed services are intended to address readily accessible abandoned waste and bulky items commonly found at the designated locations, including mattresses, furniture, appliances, electronics, bagged trash, wood, and tires without rims. For operational and safety reasons, the Agreement excludes loose or windblown litter, shopping carts, encampment-related property, sharps, biohazardous waste, non-containerized liquids, and materials that cannot be safely handled by a two-person crew. Public Works and Caltrans will continue to coordinate the removal of excluded materials and address conditions outside Recology’s scope through the appropriate agency personnel or specialized contractors.

Compensation and Program Administration
The proposed pricing structure is designed to provide the City with a predictable base cost while allowing service levels to increase when site conditions require additional time or disposal capacity. The $675 minimum daily charge covers the standard deployment of a two-person crew and two vehicles for up to two hours, including disposal of the first ton of material. Additional crew time would be billed at $286 per hour, and disposal quantities exceeding one ton would be billed at $103 per ton. Recology would invoice the City monthly based on actual services provided, subject to a total agreement limit of $200,000 unless additional authorization is obtained.

Agreement Form and City Council Authorization
The proposed Agreement was negotiated specifically for this service arrangement and therefore does not use the City’s standard General Services Agreement form. It coordinates the new services with Recology’s existing Franchise Agreement by relying on the insurance coverage maintained under that agreement, while separately addressing authorization to perform work at the designated Caltrans-owned locations and allocating the associated responsibilities and risks. The Agreement also establishes the applicable compensation terms, termination rights, and indemnification obligations. The City Attorney’s Office has reviewed and approved the final Agreement as to form.

269 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 3 of 3 ends

The City's current Award of Contract Policy requires advance City Council approval for agreements that do not conform to the City's standard form. The policy also establishes City Manager signing authority of $99,000, effective July 1, 2026. Because the Agreement uses a non-standard form and has a not-to-exceed amount of $200,000, City Council authorization is required.

Future Amendments and Other Non-City-Owned Properties
The Agreement allows Recology to provide the services at additional sites within the City upon the mutual written agreement of the parties. Before adding a site, the City will confirm lawful access and compliance with any applicable permitting and operational requirements. Any expansion of services will remain subject to available appropriations, the agreement’s authorized not-to-exceed amount, and the City’s financial policies. Any amendment that increases total compensation or otherwise exceeds delegated authority will be presented to the City Council for consideration.

The Agreement is limited to the authorized collection services and does not alter ownership of the covered properties or transfer Caltrans’ broader property maintenance responsibilities to the City. It provides a practical mechanism for the City to address visible and recurring illegal dumping where Caltrans has authorized access and where conditions directly affect the San Bruno community.

CONCLUSION:

The Agreement closes a service gap between the City's existing illegal dumping program and recurring conditions on Caltrans-owned property. It establishes defined routes, response expectations, documentation, and compensation while preserving the City's permit and legal access requirements. Authorizing the Agreement will support the Clean-Up San Bruno Initiative by improving the consistency and timeliness of illegal dumping removal at State-owned locations without shifting the cost to Recology ratepayers.

FISCAL IMPACT:

The proposed Agreement has a one-year term and a total not-to-exceed amount of $200,000.

Funding is available within the City Council-approved Clean-Up San Bruno Initiative budget for abatement services. Expenditures will be based on actual services performed.

ENVIRONMENTAL IMPACT:

The action is not a project subject to CEQA. City Council’s action is not considered a “project” per CEQA Guidelines and therefore no further environmental analysis is required.

RECOMMENDATION:

Adopt a Resolution Authorizing the City Manager to Execute a Services Agreement with Recology San Bruno for Illegal Dumping Collection Services on Caltrans-Owned Property in an Amount Not to Exceed $200,000 for a One-Year Term and Determine the Project is Exempt Under the California Environmental Quality Act
ATTACHMENTS:

1. Resolution

270 of 336

1 RESOLUTION NO. 2026 - ___

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN BRUNO AUTHORIZING

THE CITY MANAGER TO EXECUTE A SERVICES AGREEMENT WITH RECOLOGY SAN

BRUNO FOR ILLEGAL DUMPING COLLECTION SERVICES ON CALTRANS-OWNED PROPERTY IN AN AMOUNT NOT TO EXCEED $200,000 FOR A ONE-YEAR TERM AND

DETERMINING THE PROJECT IS EXEMPT UNDER THE CALIFORNIA ENVIRONMENTAL

QUALITY ACT
WHEREAS, for Fiscal Year 2025-26, the City Council identified litter and illegal dumping as a priority and initiated the Clean-Up San Bruno Initiative (the Initiative) as a coordinated, multi-departmental effort focused on abatement, prevention, enforcement, public education, and interagency coordination, with dedicated funding for abatement services; WHEREAS, the City and Recology San Bruno (Recology) are parties to an Amended and Restated Solid Waste Collection Services Agreement, effective January 1, 2023, as subsequently amended (Franchise Agreement), which requires Recology to provide an abandoned waste and illegal dumping program on City property and within City rights-of-way, but does not require those services on California Department of Transportation (Caltrans)- owned property;
WHEREAS, in November 2025, Caltrans issued the City an encroachment permit authorizing the removal and collection of garbage and debris from designated Caltrans-owned properties within San Bruno and identified Recology as an authorized contractor; WHEREAS, the proposed Services Agreement with Recology (Agreement) is a separate Initiative-funded agreement that does not amend the Franchise Agreement or expand services funded through solid waste customer rates, and establishes a one-year program serving 13 designated Caltrans hotspots in an amount not to exceed $200,000, with all associated costs and revenues excluded from solid waste rate calculations; WHEREAS, the Agreement was negotiated specifically for this service arrangement and does not use the City's standard General Services Agreement form and has been reviewed and approved as to form by the City Attorney's Office;
WHEREAS, the City's Award of Contract Policy requires advance City Council approval for agreements that do not conform to the City's standard form and establishes City Manager signing authority of $99,000, effective July 1, 2026; therefore, City Council authorization is required; and
WHEREAS, the Agreement permits the parties, by mutual written agreement, to add other non-City-owned sites within San Bruno, subject to confirmation of lawful access, compliance with applicable permitting and operational requirements, available appropriations, the authorized not-to-exceed amount, and the City's financial policies, and does not alter ownership of the covered properties or transfer Caltrans' broader property maintenance responsibilities to the City.
271 of 336 ATTACHMENT 1
2 NOW, THEREFORE, BE IT RESOLVED that the San Bruno City Council hereby:

1.Approves the Services Agreement with Recology San Bruno for illegal dumping collection services on Caltrans-owned property, in the form attached as Exhibit A, for a one-year term and in an amount not to exceed $200,000.

2.Authorizes the City Manager to execute the Agreement approved by this Resolution.

3.Authorizes the City Manager to execute written amendments mutually agreed upon by the City and Recology to add other non-City-owned sites within San Bruno, provided that the City confirms lawful access and compliance with applicable permitting and operational requirements, sufficient budget appropriations are available, and total compensation does not exceed $200,000. Any amendment that increases the not-to- exceed amount or otherwise exceeds the authority granted by this Resolution shall be presented to the City Council for consideration.

4.Determines the Project is Exempt Under the California Environmental Quality Act.

Exhibit A: Recology Services Agreement
---oOo---
I hereby certify that foregoing Resolution No. 2026 – ___ was introduced and adopted by the San Bruno City Council at a regular meeting on August 25, 2026, by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:
_________________________________
Lupita Huerta, City Clerk

272 of 336

SERVICES AGREEMENT
This Services Agreement (this “Agreement”) is entered into as of , 2026 between the City of San Bruno, a California municipal corporation (“City”), and Recology San Bruno, a California corporation (“Recology”).

WHEREAS, the California Department of Transportation (“Caltrans”) owns certain properties within City that are prone to illegal dumping; WHEREAS, Caltrans has issued an Encroachment Permit No. 04-25-N-MC-2630, which includes City and Recology as contractors authorized to perform work on Caltrans sites in the City; WHEREAS, City and Caltrans have a shared interest in cleaning up illegally dumped material from these properties;
WHEREAS, City and Recology are parties to an Amended and Restated Solid Waste Collection Services Agreement dated November 10, 2022 (such agreement as amended, the “Franchise Agreement”);
WHEREAS, the illegal dumping cleanup program provided by Recology under the Franchise Agreement does not cover Caltrans-owned properties; WHEREAS, City wishes for Recology to provide illegal dumping cleanup services at certain Caltrans-owned properties, and Recology wishes to provide such services, as provided herein;
NOW THEREFORE, the parties agree as follows:

1. Term
The term of this Agreement (the “Term”) shall commence on , 2026 and shall continue for one (1) year, unless earlier terminated in accordance with the provisions of this Agreement. The Term may be extended by mutual written agreement of the parties.

2. Services

2.1 Recology shall perform the services set forth in Exhibit A (the “Services”) at the Caltrans-owned locations set forth in Exhibit B (the “Caltrans Hotspots”). Recology shall use reasonable care in performing the Services and shall perform the services in compliance with all applicable federal, state and local laws (collectively, “Applicable Law”). Recology may provide the Services at additional sites within the City upon the mutual written agreement of the parties.

3. Compensation

3.1 As full compensation for the Services provided by Recology at the Caltrans Hotspots, City shall compensate Recology as provided in Exhibit C . Compensation shall not exceed Two Hundred Thousand Dollars ($200,000). Recology shall invoice City on a monthly basis. City shall pay undisputed invoiced amounts within forty-five (45) days after receipt of the 273 of 336
ATTACHMENNT 1, Exhibit A
2 invoice. Overdue payments shall accrue interest at one-and-one-half percent (1.5%) per month, or the maximum amount permitted by law, whichever is less. Recology may suspend provision of the Services if and for so long as City is overdue in its payments.

3.2 The parties acknowledge and agree that the Services provided by Recology under this Agreement are outside the scope of the Franchise Agreement, and accordingly the costs and revenues of Recology associated with this Agreement shall be excluded from any rate calculations under the Franchise Agreement.

4. Force Majeure

4.1 A party shall be excused from its obligations under this Agreement (other than payment obligations) in the event, and for so long as, it is impossible or extremely impracticable for such party to perform such obligations due to Force Majeure or the effect thereof. “Force Majeure” means (i) an act of God, flood, fire, earthquake, landslide, epidemic, storm or similar occurrence, (ii) an act of war, insurrection, terrorism, riot, civil disobedience, sabotage or similar occurrence, (iii) a strike or other labor action, or (iv) any other event or occurrence not the fault of, and beyond the reasonable control of, the party claiming excuse. A party claiming excuse under this section shall promptly give notice thereof to the other party together with a description of the Force Majeure, and use reasonable best efforts to remedy its inability to perform as quickly as possible.

5. Default & Termination

5.1 Either party may terminate this Agreement for convenience upon thirty (30) days’ written notice to the other.

5.2 Either party may, without waiver of or prejudice to any of its other rights and remedies under this Agreement, under Applicable Law or otherwise, terminate this Agreement upon written notice to the other party if:

5.2.1 Any representation or warranty of such other party proves to have been materially false or misleading when made; or

5.2.2 Such other party has breached any of its obligations under this Agreement (other than payment obligations) and has failed to cure such breach within thirty (30) days after written notice of the breach by the non-breaching party, provided, however, that if the nature of the breach is such that it is not capable of being cured within such thirty (30) day period, the cure period shall be extended for such additional time as is reasonably necessary to effect the cure, provided that the breaching party promptly commences reasonable efforts to cure the breach and diligently pursues such efforts until the breach is cured; or

5.2.3 Such other party fails to pay its debts generally as they become due, or commences a proceeding for relief under any bankruptcy, insolvency or similar law, or an involuntary proceeding is commenced against it under any such law which remains undismissed or unstayed for sixty (60) days, or if an order is made or a resolution is passed for its liquidation, dissolution or winding up.

274 of 336

3 6. Insurance

6.1 Recology shall maintain insurance for the benefit of City covering the Services provided under this Agreement, as provided under the Franchise Agreement.

7. Indemnification

7.1 Recology shall defend (with counsel reasonably acceptable to City), indemnify and hold harmless City and its officers, officials, agents, employees, agents and volunteers (collectively, “Indemnitees”), from and against any and all liabilities, costs, damages, penalties, fines, forfeitures, liens, demands, claims, causes of action, suits, and judgments, and costs and expenses incidental thereto, including court costs and reasonable attorneys’ fees (collectively, “Claims”), which any or all of the Indemnitees may hereafter suffer, incur, be responsible for or pay out, to the extent caused by (i) any breach of this Agreement by Recology, including any representations and warranties herein, (ii) any willful misconduct, negligent action or omission, or violation of Applicable Law by Recology in connection with this Agreement, (iii) the acts of Recology, its agents, employees, and/or subcontractors in performing services under this Agreement for which strict liability is imposed by law, or (iv) any Hazardous Waste released, threatened to be released, or spilled by Recology under this Agreement, or disposed of by Recology under this Agreement at any facility owned by Recology or any of its affiliates, in each of (i), (ii), (iii) or (iv) of or by Recology, its affiliates, or its or their respective employees, officers, directors, owners, agents or subcontractors (all the foregoing collectively, the “Recology Parties”). Such indemnity shall be limited to exclude Claims to the extent they arise as a result of any breach of this Agreement, willful misconduct, negligent action or omission, or violation of Applicable Law by any of the Indemnitees.

7.2 Other Provisions. A party seeking indemnity shall notify the other party of any Claim promptly after becoming aware of such Claim, provided, however, that no delay in providing such notification shall affect Recology’s indemnity obligations, unless (and only to the extent that) Recology has been actually prejudiced by such delay. Recology shall not settle any Claims without City’s prior written consent, which shall not be unreasonably withheld, conditioned, or delayed, unless the settlement involves only the payment of money damages paid in full by Recology; does not impose an injunction or other equitable relief upon the indemnitees subject to the settlement; does not constitute an admission of wrongdoing by any such indemnitee; and results in the unconditional release of such indemnitees with respect to all claims for which indemnity is sought. The party seeking indemnity shall provide, to Recology and its counsel, reasonable access to its employees, property and records reasonably related to the claim (excluding records protected by the attorney-client privilege or the work-product doctrine).

8. Miscellaneous

8.1 Entire Agreement. This Agreement sets forth the entire agreement and understanding of the Parties with respect to the subject matter hereof, and supersedes any prior agreements, representations or understandings with respect thereto. For clarity, this Agreement shall not affect either party’s rights or obligations under the Franchise Agreement.

275 of 336

4 8.2 Amendment. No modification, waiver or amendment of this Agreement or any provision hereof shall be effective unless in writing and signed by the party(ies) to be bound.

8.3 Assignment & Subcontracting. Neither party may assign or subcontract this Agreement, or any of its rights or obligations hereunder, without the prior written consent of the other party. This Agreement shall be binding upon and inure to the benefit of the successors and assigns of each party.

8.4 Governing Law. This Agreement and the rights and obligations of the Parties hereunder shall be governed by and construed in accordance with the laws of the State of California, without regard to its choice of law or conflicts of law provisions.

8.5 Severability. If any non-material provision of this Agreement is held unenforceable, the invalidity of such provision shall not invalidate the remainder of this Agreement, which shall remain in full force and effect.

8.6 Notices. Unless otherwise provided herein, all notices required or permitted hereunder shall be in writing, shall be sent to the receiving party’s address below (or such other address as the party designates by written notice given in accordance with this section), and shall be deemed effectively given upon personal delivery or confirmed delivery by a nationally recognized overnight courier.

If to City, then to:

City of San Bruno, Public Works
Attn: Matthew Lee
567 El Camino Real
San Bruno, CA 94066
If to Recology, then to:

Recology San Bruno
Attn: Legal Department
50 California Street, 24
th Floor
San Francisco, CA 94111

8.7 Compliance with Laws. In the performance of its obligations hereunder, each party shall comply with Applicable Law. Each party represents and warrants that it has all necessary licenses, permits and authorizations necessary for it to perform its obligations hereunder, and agrees to maintain the same in effect throughout the Term.

8.8 No Conflict. Each party represents and warrants that its execution, delivery and performance of this Agreement has been duly authorized and does not and shall not conflict with or constitute a breach of any agreement to which it is a party or by which it is bound, any provision of Applicable Law, or any other legal requirement.

8.9 Independent Contractors. It is understood and agreed that the Parties hereto are independent contractors and any other relationship, including joint venturers or partners, is expressly denied.

8.10 Remedies Cumulative. All remedies afforded to any party hereto, either under this Agreement, at law, in equity or otherwise, shall be cumulative and not alternative. No failure or delay in exercising any right or remedy hereunder shall operate as a waiver thereof, nor shall any single or partial exercise thereof preclude any other or further exercise thereof.

276 of 336

5 8.11 Survival. All payment obligations hereunder, and Sections 7 (Indemnification), and 8 (Miscellaneous) hereof, shall survive the expiration or earlier termination of this Agreement.

8.12 Interpretation. This Agreement shall be construed as if drafted jointly by the Parties, and no presumptions or burdens of proof shall arise favoring any party by virtue of the authorship of any provisions of this Agreement. Section headings are for convenience and shall not be used in construing this Agreement. “Including” and its variants mean “including without limitation.”

8.13 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed an original and all of which together constitute one instrument. Facsimile signatures (including PDFs sent by email) and electronic signatures (e.g. Docusign) shall be valid. (signature page follows)

277 of 336

278 of 336

7 Exhibit A

SERVICES

1. Recology shall perform all Services using a single crew consisting of two (2) workers and two (2) trucks (one flatbed, one rear-loader). When not performing Services, these resources may used in other Recology activities.

2. The Recology crew shall dedicate up to two (2) hours per Work Day to performing the Services, but shall spend more time if needed to perform the obligations specified in this Exhibit A. “Work Day” means Monday-Friday, excluding Christmas Day and New Year’s Day.

3. The Recology crew shall visit each Caltrans Hotspot once per Work Day. If Recology observes abandoned waste at a Caltrans Hotspot, Recology shall use reasonable good faith efforts to remove the abandoned waste by the end of that day.

4. If Recology receives a complaint of abandoned waste at a Caltrans Hotspot, Recology shall respond to the complaint and use reasonable good faith efforts to remove the abandoned waste by the end of the next Work Day.

5. Complaints may be submitted to Recology by the City, by Caltrans, or by the public through the San Bruno Responds website.

6. City shall provide Recology with access to the San Bruno Responds web platform, and Recology shall monitor the platform daily, all as provided in the Franchise Agreement.

7. Recology shall log collections of abandoned waste under this Agreement on the San Bruno Responds web platform.

8. Recology shall deliver all abandoned waste collected pursuant to this Agreement to the Transfer Station and arrange for its Disposal in accordance with Applicable Law.

9. If the type or quantity of abandoned waste at the Caltrans Hotspots is such that it cannot reasonably be removed by the Recology crew by the end of the day when it is supposed to be removed, Recology shall notify the City at [email protected].

10. The types of abandoned waste that Recology shall collect include, but are not limited to, mattresses, furniture, appliances, electronics, rugs, clothing, wood, bags of trash, and tires without rims, in each case subject to the limitations below.

11. Recology shall also collect, as abandoned waste, household hazardous waste of the types accepted for Disposal at the Transfer Station, which include water-based paint, oil-based paint, motor oil and filters, anti-freeze, car batteries, household batteries, and fluorescent tubes, provided, however, that Recology shall not be required to collect paint, motor oil, or anti-freeze in excess of five (5) gallons, or that is not containerized.

279 of 336

8 12. Recology shall only be required to collect abandoned waste that is on Caltrans property; that is at a location easily accessible by Recology’s personnel and vehicles; that fits into one of the Recology crew’s vehicles; that can be readily loaded without sweeping or gathering; that can be safely loaded into the vehicle by two (2) people without being carried more than twenty-five feet (25’) to the public right of way; and that is accepted for Disposal at the Transfer Station. For clarity, Recology shall not be required to drive its vehicles onto Caltrans property.

13. Recology shall not be required to collect any of the following: Hazardous Waste, Sharps, Biohazardous or Biomedical Waste, or other Exempt Waste; shopping carts; litter or small- scale items such as loose plastic or paper bags or windblown debris; liquid or semi-solid waste; dirt, or other materials; any materials not accepted for Disposal at the Transfer Station; any material from homeless encampments or from any homeless person; or any material that, in Recology’s reasonable opinion, may pose a danger to employees of Recology or that appears to be personal property and not abandoned waste.

14. It is understood that the City’s Department of Public Works will be deploying additional resources to combat litter at the Caltrans Hotspots.

15. The terms “Disposal,” “Biohazardous or Biomedical Waste,” “Exempt Waste,” “Hazardous Waste,” “Sharps,” and “Transfer Station” shall have the meanings given to them in the Franchise Agreement.

280 of 336

9 Exhibit B

HOTSPOTS
The Caltrans properties at the following locations:

1. Shaw Road and 7th Avenue beneath the I-380 overpass

2. San Mateo Avenue under the I-380 overpass

3. Herman Avenue under the I-380 overpass

4. Huntington Avenue under the I-380 overpass

5. Hillside between I-380 and Forest Lane, running from Masson Ave to Huntington Ave

6. El Camino Real and I-380 on- and off-ramps (northbound and southbound)

7. North side of I-380 along Tanforan Mall

8. North side of I-380 between El Camino Real and Cherry Avenue overpass

9. San Bruno Ave, between Skyline Boulevard and Glenview Drive (State of California owned parcel)

10. Skyline Boulevard and Berkshire Drive

11. Skyline Boulevard between College Drive and Sneath Lane

12. I-280 access roads between San Bruno Avenue and Sneath Lane

13. I-280 overpass at Crestmoor Drive

281 of 336

10 Exhibit C

COMPENSATION
Recology’s compensation for the Services shall be as follows:
(i) A minimum daily charge of $675.00 per Work Day, which shall cover the cost of two (2) workers and two (2) trucks (one flatbed, one rear-loader), for up to two (2) hours per day, as well as the cost of Disposal of up to one (1) ton of abandoned waste per day. (ii) If Recology personnel spend more than two (2) hours performing the Services in a given Work Day, or the volume of abandoned waste exceeds one (1) ton in a given day, the additional cost above the minimum daily charge shall be as follows:
o $286.00 per hour for two (2) workers and two (2) trucks, above two (2) hours per day.
o $103.00 per ton of abandoned waste Disposed, above one (1) ton per day. (iii)Time spent shall include all drive time to and from Hotspots and to and from the Transfer Station, and time to load and unload vehicles.

282 of 336

City Council Agenda Item
Staff Report

CITY OF SAN BRUNO
DATE: August 25, 2026
TO: Honorable Mayor and Members of the City Council
FROM: Alex D. McIntyre, City Manager
PREPARED BY: Matt Lethin, Police Chief
SUBJECT: Consider Introducing, Reading by Title Only, and Waiving Further Reading of an Ordinance Entitled “An Ordinance of the City Council of the City of San Bruno Amending Chapter 6.48 of the San Bruno Municipal Code Regarding Penalties for False Alarms”; Consider Adoption of a Resolution Establishing Administrative Penalties for Repeated False Alarms Pursuant to Chapter 6.48 of the San Bruno Municipal Code, and Adoption of a Resolution Authorizing the Police Chief to Execute a Non- Standard Agreement with PMAM Corporation for False Alarm Management and Billing Services
BACKGROUND:

The San Bruno Police Department responds to alarm calls throughout the community on a regular basis. While many alarm activations are legitimate, a significant number are determined to be false alarms caused by user error, equipment malfunction, improper maintenance, or other non-emergency factors. Repeated false alarms consume police resources, increase operational costs, and divert officers from legitimate calls for service.

The City's Municipal Code has addressed false alarms for more than two decades through Chapter 6.48, which currently authorizes the assessment of fees after repeated false alarms within a 180-day period. Those fees were originally established as cost recovery measures intended to reimburse the City for police responses while encouraging alarm users to properly maintain and operate their alarm systems. While the ordinance has provided a relatively effective framework for discouraging repeated false alarms, staff has identified opportunities to modernize the ordinance to improve clarity, strengthen enforcement tools, and better support long-term administration of the City's false alarm program.

Historically, the City administered false alarm billing internally. However, due to staffing shortages and operational capacity limitations, administration of the false alarm program gradually ceased, resulting in the City no longer recovering costs associated with repeated false alarm responses.

As part of the Police Department's continued efforts to improve operational efficiency and reduce unnecessary demands on police resources, staff evaluated options for restoring the City's false alarm program. Staff determined that updating the City's ordinance while contracting with a specialized third-party administrator represents the most effective and efficient approach. 283 of 336
Item 6a.

Honorable Mayor and Members of the City Council
August 25, 2026

Page 2 of 4 ends

DISCUSSION:

Staff is requesting three complementary actions to restore and modernize the City's false alarm management program.

First, staff recommends introducing an ordinance amending Chapter 6.48 of the San Bruno Municipal Code. While the City's existing ordinance has provided a framework for addressing repeated false alarms for many years, staff and the City Attorney identified several opportunities to modernize and strengthen the ordinance.

The proposed ordinance adds clear definitions for key terms, establishes an affirmative responsibility for alarm users to properly maintain and operate alarm systems, and converts the City's false alarm assessment from a cost recovery fee to an administrative penalty. These revisions provide greater clarity, improve enforceability, and better align the ordinance with current legal standards.

The proposed ordinance also changes the evaluation period for repeated false alarms from 180 days to 365 days. Under the proposed ordinance, the City would consider the number of false alarms occurring at a location during the preceding 365-day period when determining whether an administrative penalty should be assessed. This approach provides alarm users additional time to identify and correct recurring issues while continuing to hold chronic offenders accountable for repeated false alarms.

Consistent with the City's educational approach, no administrative penalty would be imposed until a third false alarm occurs within the preceding 365-day period. Staff recommends establishing administrative penalties by separate resolution as follows:
Third false alarm within 365 days: $250
Fourth false alarm within 365 days: $500
Fifth and each subsequent false alarm within 365 days: $750 The proposed ordinance also declares three or more false alarms within a 365-day period to constitute a public nuisance. This provides the City with an additional enforcement tool for alarm systems that repeatedly generate unnecessary police responses and consume limited public safety resources.

Second, staff recommends adoption of a resolution establishing the administrative penalty schedule for repeated false alarms. Establishing penalties by resolution allows the City Council to adjust penalty amounts in the future without requiring amendments to the Municipal Code.

Third, staff recommends approval of a non-standard agreement with PMAM Corporation to administer the City's false alarm management program.

PMAM specializes in false alarm management services for local governments, including numerous jurisdictions throughout California and the Bay Area. Under the proposed agreement, PMAM would administer the City's false alarm program by maintaining alarm records, issuing warning notices and administrative penalties, processing payments, providing customer service, generating reports, and coordinating with the Police Department and Finance Department regarding program administration.

284 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 3 of 4 ends

The proposed agreement includes an initial three-year term with automatic annual renewals unless terminated by either party. Compensation is structured as a revenue-sharing model in which the City and PMAM each receive fifty percent of collected administrative penalties after allowable processing costs.

In developing the proposed ordinance and administrative penalty schedule, staff reviewed false alarm programs utilized by neighboring San Mateo County jurisdictions. The recommended approach is generally consistent with regional practices by emphasizing education before enforcement, assessing penalties only after repeated false alarms, and utilizing progressively increasing penalties designed to encourage corrective action while reducing unnecessary demands on police resources.

The primary purpose of the proposed program is to encourage compliance with the City's false alarm ordinance, improve accountability for repeated false alarms, and reduce unnecessary police responses. Based on an analysis of recent alarm response data, San Bruno police officers spend an average of approximately 11 minutes on scene for each alarm response. With approximately 1,100 alarm calls annually, officers devote an estimated 206 hours each year responding to alarm calls. Reducing unnecessary false alarms is expected to improve officer availability for higher-priority calls for service while any revenues generated through administrative penalties will partially offset program administration costs.

Together, the proposed ordinance, administrative penalty schedule, and agreement are expected to:
Improve accountability for alarm owners through consistent administration of the City's ordinance.
Encourage proper maintenance and operation of alarm systems. Reduce unnecessary police responses to false alarms.
Improve officer availability for higher-priority calls for service. Restore administration of the City's false alarm program without increasing City staffing. Establish a fair and consistent administrative process that emphasizes education before enforcement.

The proposed agreement is considered non-standard due to vendor-specific provisions related to software ownership, limitations on indemnification, termination provisions, and its revenue- sharing compensation structure. Accordingly, City Council authorization is required before the agreement may be executed.

FISCAL IMPACT:

The intent of the proposed ordinance is not to generate revenue, but to encourage alarm users to properly maintain and operate alarm systems, thereby reducing unnecessary police responses and improving the availability of officers to respond to emergencies and other community needs.

The proposed agreement does not require a direct General Fund appropriation. PMAM's compensation is based entirely upon revenues generated through the false alarm program.

285 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 4 of 4 ends

Under the agreement, the City and PMAM will each receive fifty percent of collected administrative penalties after allowable processing costs and postage expenses.

ENVIRONMENTAL IMPACT:

The proposed action is not a project subject to the California Environmental Quality Act (CEQA) because it does not have the potential to result in a direct or reasonably foreseeable physical change in the environment.

RECOMMENDATION:

Staff recommends that the City Council:

1. Introduce, read by title only, and waive further reading of an Ordinance amending Chapter

6.48 of the San Bruno Municipal Code regarding false alarms;

2. Adopt a Resolution establishing administrative penalties for repeated false alarms;

3. Adopt a Resolution authorizing the Police Chief to execute a non-standard agreement with PMAM Corporation for false alarm management services.

ALTERNATIVES:

1. Decline to introduce the ordinance and/or approve the agreement.

The City would continue without an active false alarm management program, limiting its ability to discourage repeated false alarms, recover associated costs, and improve the efficient use of police resources.

2. Provide alternative policy direction.

Direct staff to revise the proposed ordinance, modify the proposed agreement, or return with alternative options for administering the City's false alarm program.

ATTACHMENTS:

1. Ordinance Amending Chapter 6.48 of the San Bruno Municipal Code Regarding False Alarms

2. Resolution Establishing Penalties for Repeated False Alarms per Chapter 6.48 of the San Bruno Municipal Code

3. Resolution Authorizing the Police Chief to Execute a Non-Standard Agreement with PMAM Corporation for False Alarm Management and Billing Services

4. Agreement for Alarm Program Administration Services with PMAM Corporation

286 of 336

1 3
9 2
3 ORDINANCE NO. ____

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN BRUNO AMENDING CHAPTER 6.48 OF THE SAN BRUNO MUNICIPAL CODE REGARDING PENALTIES FOR

FALSE ALARMS
THE CITY COUNCIL OF THE CITY OF SAN BRUNO DOES ORDAIN AS FOLLOWS:

SECTION 1. Section 6.48.010 (Fee determination) of Chapter 6.48 (False Alarms) of the San Bruno Municipal Code is amended and replaced in its entirety to read as follows:

Section 6.48.010 False alarms prohibited.

A. The city council finds and determines that responses to false alarms by the city can result in a significant expenditure of police department time and resources and increased costs to the public for law enforcement services. The council, therefore, finds that it is necessary and appropriate for the city to impose penalties for responses to false alarms on the persons responsible for such alarms.

B. Each alarm user has a duty to take all reasonable steps to prevent false alarms.

Reasonable steps are maintaining the alarm system in good working order, providing the necessary service to prevent malfunctions, and controlling use of the alarm system to activate only when there is evidence of a crime or other activity on the premises that warrants the assistance of the city’s police department on the premises.

C. An alarm user shall not have two or more false alarms within a three hundred- and sixty-five-day period. After the second false alarm from an alarm system during a three hundred- and sixty-five-day period, the police department may send a warning notice to the alarm user, which shall state the date and time of the second false alarm, and that subsequent false alarms occurring within the three hundred- and sixty-five-day period are subject to a false alarm fee pursuant to this section.

D. The false alarm fee is an administrative penalty for violating this section

6.48.010. The amount of the false alarm fee shall be established by resolution of the city council.

E. The following terms are defined for the purposes of this chapter as follows:
(i) “Alarm officer” means the officer or employee of the city or its police department, having responsibility for responding, or for causing the response, to an activated alarm system.
(ii) “Alarm user” means any person who purchases, leases, contracts for, or otherwise obtains and operates an alarm system or contracts for the servicing or maintenance of an alarm system at the alarm user’s premises. (iii) “False alarm” means the notification to the city’s police department concerning the activation of an alarm system when there is no evidence of a crime or other activity that warrants the assistance of the city’s police department on the premises, as indicated by the investigation of a police officer on the scene or by the lack of a police report filed by the occupant or property owner, and no individual who was on or near the premises or who viewed a video communication from, or live-monitored the premises called for the dispatch or confirmed a need for police response. “False alarm” shall not include an alarm for which the city’s police department personnel do not actually arrive at the 287 of 336 ATTACHMENT 1
2 3
9 2
3 alarm location, or any alarm caused by earthquakes, severe storms or other extraordinary circumstances determined by the alarm officer to be clearly beyond the control of the alarm user.

F. Pursuant to California Government Code Section 38771, the city council hereby declares three or more false alarms during a three hundred- and sixty-five-day period to be a nuisance.

SECTION 2.Section 6.48.0600 (Conduct) of Chapter 6.48 (False Alarms) of the San Bruno Municipal Code is amended to read as follows (deleted language shown with strike through and added language shown with underline):

At the date set for hearing, the city manager shall hear all competent testimony relating to the granting of the permit imposition of false alarm fees and may continue the hearing to a fixed date.

SECTION 3.Severability. If any provision, clause, sentence or paragraph of this chapter or the application thereof to any person or circumstances shall be held invalid, such invalidity shall not affect the other provisions of this chapter which can be given effect without the invalid provision or application, and to this end the provisions of this chapter are declared to be severable.

SECTION 4.Effective Date. This ordinance shall take effect at 12:01 am on the thirty-first day after its adoption.

SECTION 5.Publication. The City Clerk shall certify to the adoption of this ordinance and shall cause this ordinance to be published according to law. __________________________________
Rico E. Medina, Mayor
ATTEST:
_________________________________
Lupita Huerta, City Clerk
APPROVED AS TO FORM:
__________________________________
Trisha A. Ortiz, City Attorney

288 of 336

3 3
9 2
3 --oOo--
I hereby certify that foregoing Ordinance No. ____
was introduced at a regular meeting of the San Bruno City Council on August 25, 2026 and adopted by the San Bruno City Council at a regular meeting on __________, 2026, by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:
__________________________________
Lupita Huerta, City Clerk

289 of 336

1 RESOLUTION NO. 2026 - ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN BRUNO ESTABLISHING

ADMINISTRATIVE PENALTIES FOR REPEATED FALSE ALARMS PURSUANT TO CHAPTER 6.48 OF THE SAN BRUNO MUNICIPAL CODE
WHEREAS, Chapter 6.48 authorizes the City Council to establish administrative penalties for repeated false alarms by resolution; and
WHEREAS, repeated false alarms unnecessarily consume police resources and reduce officer availability for legitimate public safety needs; and WHEREAS, the City Council finds that a progressive administrative penalty schedule encourages alarm users to properly maintain alarm systems while providing reasonable opportunities to correct recurring problems before penalties are imposed.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of San Bruno hereby establishes the following administrative penalties for false alarms occurring at the same alarm location within any rolling three hundred sixty-five (365) day period:

1. No administrative penalty shall be imposed for the first false alarm.

2. Following the second false alarm, the Police Department may issue a written warning advising the alarm user that subsequent false alarms occurring within the same rolling three hundred sixty-five (365) day period will be subject to administrative penalties.

3. A third false alarm shall be subject to an administrative penalty of Two Hundred Fifty Dollars ($250.00).

4. A fourth false alarm shall be subject to an administrative penalty of Five Hundred Dollars ($500.00).

5. A fifth and each subsequent false alarm occurring within the same rolling three hundred sixty-five (365) day period shall be subject to an administrative penalty of Seven Hundred Fifty Dollars ($750.00).

BE IT FURTHER RESOLVED that these administrative penalties shall become effective upon the effective date of Ordinance No. _____ amending Chapter 6.48 of the San Bruno Municipal Code and shall remain in effect until modified by subsequent resolution of the City Council.
---oOo---
I hereby certify that foregoing Resolution No. 2026 – ___ was introduced and adopted by the San Bruno City Council at a regular meeting on August 25, 2026, by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:
_________________________________
Lupita Huerta, City Clerk
290 of 336 ATTACHMENT 2
1 RESOLUTION NO. 2026 - ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN BRUNO AUTHORIZING

THE POLICE CHIEF TO EXECUTE A NON-STANDARD AGREEMENT WITH PMAM

CORPORATION FOR FALSE ALARM MANAGEMENT AND BILLING SERVICES WHEREAS, the City Council has determined that reducing repeated false alarms is an important public safety objective that improves officer availability for legitimate calls for service; and
WHEREAS, the City Council has introduced an ordinance modernizing Chapter 6.48 of the San Bruno Municipal Code to improve administration of the City's false alarm program; and WHEREAS, PMAM Corporation specializes in administering false alarm management programs for local government agencies, including customer service, billing, collections, reporting, and program administration; and
WHEREAS, the proposed agreement is non-standard in form due to certain vendor- specific contractual provisions and therefore requires City Council authorization prior to execution; and
WHEREAS, the City Council finds that entering into the agreement is in the best interests of the City and will improve administration of the City's false alarm program.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of San Bruno hereby authorizes the Police Chief, or the Police Chief's designee, to execute the Agreement for Alarm Program Administration Services with PMAM Corporation, in substantially the form presented to the City Council, together with such non-substantive revisions as may be approved by the City Attorney.
---oOo---
I hereby certify that foregoing Resolution No. 2026 – ___ was introduced and adopted by the San Bruno City Council at a regular meeting on August 25, 2026, by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:
_________________________________
Lupita Huerta, City Clerk
291 of 336 ATTACHMENT 3

AGREEMENT FOR ALARM PROGRAM

ADMINISTRATION SERVICES
This Agreement for Alarm Program Administration Services (the " Agreement") is made and entered into in by and between PMAM Corporation, a Texas corporation whose address is 5430 LBJ Freeway, Suite 370 Dallas, TX 75240, (the "PM AM") and the City of San Bruno, State of California (the "City") to be effective upon the date of execution of this Agreement by the City Manager or the City’s authorized designee as set forth on the Signature Page hereto (the “Effective Date”).

Recitals
WHEREAS, the City desires to engage the services of PM AM to provide certain installation, conversion, operation and service of a False Alarm Management Program including the collection services in accordance with the City ’s alarm ordinances in accordance with the terms of this Agreement (as hereinafter defined) (collectively, the “Services”); and NOW THEREFORE, in exchange for the mutual covenants set forth herein and other valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties agree as follows:

Article 1
Scope of Services

1.1 The parties agree that PM AM shall perform the S ervices in accordance with the terms and conditions of the City ’s alarm ordinance and this Agreement . The parties' agreement consists of this Agreement and the following Exhibits , which are incorporated herein and made a part hereof by this reference thereto:

S cope of Work and Contract Requirements – Exhibit A
P ricing and Receipt of Collections - Exhibit B
In the event of a conflict in interpretation, the documents shall control in the following order: (ii) the Agreement, (ii) Exhibit A, and (iii) Exhibit B, as further modified by the written agreement by the parties as a result of software implemented and deployed by the parties.

Article 2
Terms of Agreement

2.1 The initial term of this Agreement shall be for a period of three (3) years commencing on the Contract Implementation Date (as hereinafter defined) and ending on the day immediately preceding the third anniversary of the Contract Implementation Date (the ‘Initial Term”), subject to earlier termination as set forth in Article 6 hereof. Upon the expiration of the Initial Term, this Agreement shall be subject to automatic extension from year to year thereafter (each an “Extended Term ”) on the same terms and conditions as set forth herein, unless either party notifies the other in writing at least sixty (60) days prior to the expiration of the Initial Term or the Extended Term, as applicable, that such party will not further extend the term of this Agreement. As used herein, the term “ Contract Implementation Date” shall mean the first day of the calendar month for which PM AM commences billing for its Services to the City hereunder following the installation of the False Alarm Management Program. 292 of 336
ATTACHMENT 4
2 2.2 PM AM shall receive compensation, including authorized reimbursements including reimbursement for any City fees paid by PM AM to the City to permit PM AM to provide the Services or Special Services hereunder , for all Services rendered under this Agreement at the rates set forth in pricing included in this Agreement as Exhibit “B” . The compensation is based on a revenue sharing model.

2.3 At any time during the term of this Agreement, the City may request that PM AM perform Special Services for additional compensation to be agreed upon by the City and PM AM prior to the performance of any Special Services by PM AM . As u sed herein, S pecial Services means any work which is determined by the City to be necessary for this Agree ment, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement and which PM AM agrees to perform . If the City and PM AM reach an agreement on the performance of Special Services, PM AM shall undertake such S pecial Services after receiving the authorization from the City.

2.4 The City acknowledges and agrees that PM AM reserves the right to offer, and may offer , similar services to other government agencies under similar terms and conditions as stated herein except that the revenue share percentage allocated to PM AM and the other government agency may be negotiated between PM AM and such other agency based on the specific revenue expectations, agency reimbursed costs, the exact scope of services to be provided by PM AM , and other agency requirements. PM AM acknowledges and agrees that t he City shall have no responsibility or liability whatsoever hereunder with respect to any agreement entered into between PM AM and such other government agency.

Article 3
PM AM’s Responsibilities

3.1 Subject to the limitations hereinafter set forth, PM AM agrees to and shall defend, indemnify and hold harmless the City, including its elected officials, officers, and directors (“Indemnitees”) from and against all claims, damages, losses and expenses, including reasonable attorney's fees , litigation costs and expenses (”Claims”), arising out of the performance of the Services or Special Services, caused by any grossly negligent act or omission or misconduct of PM AM , or any subcontractor of PM AM and all Claims, including reasonable attorneys’ fees, costs, and expenses incidental thereto, which may be suffered by, incurred by, accrued against, charged to, or recoverable from any Indemnitee, by reason of any Claim arising out of or relating to the Services or Special Services allegedly or actually infringing or misappropriating any United States or foreign patent, copyright, trade secret, trademark, or other proprietary right.

3.2 At all times during the term of this Agreement, PM AM shall be an independent contractor and shall not be an employee of the City . The City shall have the right to control Contactor only insofar as the results of PM AM's services rendered pursuant to this Agreement. The City shall not have the right to control the means by which PM AM accomplishes services rendered pursuant to this Agreement.

3.3 Notwithstanding any other provision of this Agreement to the contrary, in no event whatsoever shall PM AM be liable for damages or losses attributable to its actions or inactions, or its subcontractor’s actions or inactions, with respect to the Services or Special Services provided hereunder, whether for indemnification or otherwise, in excess of the Maximum Indemnification Amount. The Maximum Indemnification Amount shall be equal to the sum of: (i) any insurance

293 of 336

3 proceeds actually received by PM AM , or paid by PM AM’s insurance carrier to the City, with respect to the claim for indemnification by the City hereunder, and (ii) the amount of fees actually retained by PM AM under this Agreement as its fee during the six (6) months immediately preceding the act. Notwithstanding the preceding, the limitations on the indemnification or other obligations of PM AM set forth in this Section shall not apply to liability related to any intellectual property claims related to the Services or Special Services or the obligation of PM AM to pay the City its share of the collected revenues as set forth in this Agreement.

Within sixty (60) days after being notified of an infringement claim asserting that the PM AM Proprietary Software (as defined in section 6.1.5 hereof) infringes on the rights of a third party , PM AM shall , at its own expense, and as the sole and exclusive remedy of the City Indemnitees relating to such infringement claim, either (1) obtain for the City the right to continue using the PM AM Proprietary Software, or (2) replace or modify the PM AM Proprietary Software with compatible and functionally equivalent products that do not infringe upon the rights of third parties.

3.4 Notwithstanding any other obligation of the parties hereunder, in no event shall either party be liable for any indirect, incidental, special, consequential or punitive damages, including loss of fees, profits or income, arising directly or indirectly out of the provision or non- provision of Services or Special Services hereunder, whether or not the party had any knowledge that such damages might be incurred.

3.5 If PM AM is required to indemnify the City hereunder, PM AM may assume the defense of the City with counsel reasonably acceptable to the City at the expense of PM AM . In addition, the City may engage its own counsel to participate in any defense in any such proceeding at the City’s expense.

3.6 PM AM shall keep itself informed of all applicable federal, state and local laws, ordinances, codes, regulations and requirements which may, in any manner, affect those employed by it or in any way affect the performance of its S ervices or Special Services pursuant to this Agreement.

Notwithstanding the above, Ci ty shall inform PM AM of any local ordinances enacted by the City, which may affect those employed by PM AM or in any way affect the performance of PM AM’s Services or Special Services pursuant to this Agreement. PM AM shall, at all times, observe and comply with all such laws and regulations, including, but not limited to the Payment Card Industry Data Security Standard (PCI DSS) , California prevailing wage laws, Americans with Disabilities Act, the Stored Communications Act, 18 U.S.C. Section 2701 et seq., California Civil Code Sections 1798.80 through 1798.84, and the California Consumer Privacy A ct, Civil Code Section 1798.100 et seq. City, and its officers and employees, shall not be liable at law or in equity by reason of the failure of PM AM to comply with this paragraph.

Article 4
The City’s Responsibility

4.1 The City shall cooperate with and assist PM AM by, among other things, making available, as reasonably requested by PM AM , management decisions, personnel, information, approvals, IT assistance and acceptance that are needed by PM AM to carry out its obligation under this agreement.

294 of 336

4 Article 5
Insurance Requirements

5.1 At the current time, PM AM does not maintain any offices in the State in which the City is located, nor does PM AM maintain any employees in such State. All Services required to be performed by PM AM hereunder shall be performed by PM AM at its offices in the State of Texas or elsewhere outside the State in which the City is located. PM AM shall, at its own expense, purchase, maintain and keep in force during the term of this Agreement such insurance as set forth below. PM AM shall not commence work under this Agreement until it has obtained all the insurance required under this Agreement and such insurance has been approved by the City, nor shall PM AM allow any subcontractor to commence work on its subcontract until all similar insurance of the subcontractor has been obtained and approved. The insurance requirements shall remain in effect throughout the term of this Agreement. PM AM, at PM AM's sole cost, shall purchase and maintain, during the term of this Agreement, insurance coverage providing not less than the following:

5.1.1 Comprehensive or Commercial General Liability: $ 1,000,000 combined single limit per occurrence for bodily injury, personal injury or death and property damage. The coverage's under this policy shall include those found in the Comprehensive General Liability Broad Form endorsement. This policy shall have no standard coverage removed by exclusions, unless approved by the City.

5.1.2 Automobile Liability: $ 1,000,000 combined single limit per accident for bodily injury and property damage. Coverage should be provided as a "Code 1," any auto.

5.1.3 Workers' Compensation and Employers' Liability: Statutory. Employers Liability policy limits of $100,000 for each accident, $500,000 policy limit - Disease. The insurer shall agree to waive all rights of subrogation against the City, its officials, employees and volunteers for losses arising from the activities under this Agreement.

5. 2 All insurance policies, other than Professional Liability, provided under this Agreement shall be written on an occurrence basis.

5.3 The City shall be named as additional insured on the General Liability and Automobile Liability insurance policies. These insurance policies shall contain the appropriate additional insured endorsement signed by a person authorized by that insurer to bind coverage on its behalf. If PM AM, for any reason, fails to maintain insurance coverage which is requ ired under this agreement, the failure shall be deemed a material breach of contract. The City, at its sole option, may terminate this Agreement.

5.4 Each insurance policy shall be endorsed to state that coverage shall not be canceled, reduced in coverage or in limit s except after thirty (30) days prior written notice has been provided to the City, or in the event of cancellation because of nonpayment of premium, that the insurer shall give written notice to the City not later than ten (10) days following cancellation.

5.5 Insurance is to be placed with insurers with a Best rating of no less than A:VII. Insurers must be duly authorized to transact business in the State of Texas.

295 of 336

5 5.6 Certificates of Insurance if requested shall be su bmitted on the Accord form only. Ce rtificates and endorsements effecting covera ge required by this clause shall be forwarded to the City’s Purchasing Department.

Article 6
Termination of Agreement

6.1 Grounds for Termination

6.1.1 The City shall inform PM AM in writing, if PM AM fails to perform its duties under this Agreement with a ninety (90) days window to correct the problem. PM AM shall remedy the problem within ninety (90) days from the receipt of such notice. Should PM AM fail to remedy the problem within ninety (90) days, the City may terminate this Agreement.

6.1.2 In addition to any right of termination granted to the City pursuant to the provisions of Section 6.1.1 hereof, the City may terminate this Agreement without cause at any time after the first anniversary of t he Contract Implemen tation Date upon thirty (30) days written notice to PM AM, subject to its obligations set forth in Section 6.2 hereof.

6.1.3 In addition, the City may terminate this Agreement without cause at any time prior to the first anniversary of the Contract Implementation Date (i) upon thirty (30) days written notice to PM AM (ii) the payment of an early termination fee of $10,000, which fee PM AM may deduct and offset against the next monthly payment or payments due the City from the revenues collected by PM AM on behalf of the City hereunder as liquidated damages and not as a penalty. The parties acknowledge that the actual damages that PM AM would incur as a result of the early termination of this Agreement by the City without cause are uncertain and difficult to accurately estimate because of the parties’ inability to predict the number of future permit holders, the fees or fines charged by the City for violation o f its alarm ordinances, any other changes in the City’s alarm ordinances that could impact the revenues collected by PM AM hereunder on behalf of the City, and other relevant factors. Accordingly, the parties agree that the foregoing Termination Fee is a reasonable and appropriate estimate of actual damages and shall be deemed liquidated damages and not a penalty.

6.1.4 PM AM's Fee Schedule and pricing for any and all Services to be provided by PM AM to the City under this Agreement have been set, established and agreed to be based upon the current provisions of applicable City ordinances relating to alarms. Should said ordinances change at any time during the term of this Agreement to reduce or eliminate the applicable fee, fines and charges, such reduction or elimination shall be effective prospectively only and not retroactively so that the fee earned by PM AM for services provided prior to such modification of the alarm ordinance shall not be affected and the City shall not be entitled to any refund or credit arising from such modification of its alarm ordinance. In addition, if the change in the City ordinances relating to alarms would reduce or eliminate the fee, fines, and charges previously in effect, PM AM reserves the express right to enter into good faith negotiations with the City to modify the Fee Schedule and pricing accordingly. If, within thirty (30) days of notice from PM AM to the City of its desire to so renegotiate, the parties are unable to reach an agreement mutually acceptable to both parties, then PM AM reserves the right to terminate this Agreement. Said termination shall not be deemed to be a default by PM AM under this Agreement. PM AM shall be paid all fees and costs due and owing PM AM as of the date of said termination.

296 of 336

6 6.1.5 PM AM may terminate this Agreement upon written notice to the City if the City misuses or attempts to appropriate the proprietary software of PM AM used in connection with its False Alarm Management Program (the “PM AM Proprietary Software”).

6.1.6 PM AM may terminate this Agreement without cause at any time after the first anniversary of the Contract Implementation Date upon ninety (90) days written notice to the City.

6.2 Effect of Termination

6.2.1 If this Agreement is terminated as provided herein, the City may require PM AM to provide all finished and/or unfinished data and other information of any kind possessed by PM AM in connection with the performance of Services under this Agreement. PM AM shall be required to provide such information within a reasonable period of time of receipt of the request not to exceed thirty (30) days. Specifically, upon termination of this Agreement:

6.2.1a All data relating to alarm permits shall be owned by the City . Upon termination of this Agreement, PM AM shall promptly deliver to the City all data in MS-SQL format.

6.2.1b. PM AM retains all right and title to the PM AM Proprietary Software, including but not limited to, all publication rights, all development rights, all reproductions rights, and all rights that may follow from the commercial development of the software. The City does not acquire any ownership rights to the PM AM Proprietary Software. The PM AM Proprietary Software is protected in favor of PM AM, as well as any future registered trademarks, are trademarks of PM AM.

6.2.1c. The PM AM Proprietary Software is considered loaned to the City during the duration of this A greement as laid out in this Agreement and the City will not have any access to the PM AM Proprietary Software after the conclusion of the Agreement.

6.2.1d. The City shall pay PM AM all fees and costs due and owing PM AM as of the date of said termination.

6.2.1e. The provisions of this Section shall survive the termination of this Agreement.

Article 7
Confidentiality of Information

7.1 At all times, PM AM shall recognize the City's sole and exclusive ownership of all information provided by the City, and the sole and exclusive right and jurisdiction of the City to control the use of this information. Similarly, the City recognizes that the PM AM P roprietary Software is owned by PM AM and the City has no rights or claim thereto.

7.2 Each party agrees that neither it, nor its employees, subsidiaries, subcontractors, or agents shall disclose confidential information of the other party , to any person or to anyone except as

297 of 336

7 necessary to perform its obligations under this A greement, without the expressed written permission of the other party or unless required to do so by law. City shall promptly inform PM AM if City receives a public records request for information designated by PM AM as confidential and the date that such records will be released to the requester unless PM AM obtains a court order enjoining that disclosure. If PM AM fails to obtain a court order enjoining that disclosure, City will release the requested information it determines is disclosable on the date specified..

7.3 Each party further agree s that in the event that any documents containing confidential information of the other party should be improperly used or removed in any way from the possession or control of the other party by a party, the breaching party shall immediately notify the other party orally and in writing, and shall join with the other party at their request in taking such reasonable steps as the owner of the confidential information may deem advisable to enjoin the misuse and regain possession of such confidential information, or steps otherwise necessary for the protection of the owner’s rights and the confidentiality of the information.

7.4 PM AM agrees to return any and all data furnished and information derived hereunder , or preserve in response to a litigation hold, promptly upon a request by the City and its authorized designee.

Article 8
General Provisions

8.1 This Agreement and its attachments constitute the sole and only agreement between the parties and supersede any prior understandings written or oral agreements between the parties with respect to this subject matter.

8.2 Except as otherwise provided herein, neither this Agreement nor any of the rights, interests or obligations hereunder may be assigned by any of the parties hereto without the prior wri tten consent of the other party; provided that PM AM may assign this Agreement to its successor without consent by the City by giving written notice to the City. This Agreement shall be binding on and inure to the benefit of the parties to it and their respective heirs, executors, administrators, legal representatives, successors and assigns.

8.3 This Agreement shall be governed by the laws of the State of California ; and venue for any action concerning this Agreement shall be in San Mateo County, California.

8.4 This Agreement may be amended by the mutual written agreement of the parties.

8.5 In the event any one or more of the provisions contained in this Agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provisions, and the Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in it.

8.6 Any notice required or permitted to be delivered hereunder ma y be sent by first class mail or overnight courier to the address specified below, or to such other party or address as either party may designate in writing, and shall be deemed received three (3) days after delivery set forth herein:

298 of 336

8 City of San Bruno: ___________________
___________________
___________________
___________________

PM AM: PMAM Corporation
Attn: Mr. Pankaj Kumar, President
5430 LBJ Freeway, Suite 370
Dallas, TX 75240

8.7 This Agreement may be signed in counterparts, each of which shall constitute an original. (Signature Page Follows on Next Page)

299 of 336

9 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the __________ day of __________________ in the year ___________.

City of __San Bruno___________ PMAM Corporation
By: ________________________________ By: __________________________ Name: ________________________________, PANKAJ KUMAR, Title: ________________________________ Chief Executive Officer

Attest: Attest:

By: ________________________________ By: ___________________________ Name: ________________________________ Name: _________________________ Title: ________________________________ Title: __________________________

300 of 336

10 Exhibit A
Scope of Work and Requirements
Scope of Work:

It will be PM AM 's responsibility to provide, install, and operate the Professional Services Alarm Management Services Program based on a "False Alarm Management Solution" system hereafter referred to as a FAMS system and all other necessary equipment and services on a "software as a service" basis..

PM AM shall accurately convert all pertinent data downloaded from the City’s current primary alarm and accounts/receivable databases to populate the FAMS system. Effective interfaces shall ensure that all parties share and benefit from the most current and accurate information.

PM AM shall provide appropriate supplies and services including but not limited to;

1. Single point of contact and daily resident assistance

2. Maintenance of databases:
a. Alarm permits
b. Permit Holders
c. Permit Holders with outstanding charges
d. Non-permitted locations with outstanding charges
e. Address verification database

3. Collection of payments in accordance with the rates established by the alarm ordinance, and any implementing resolutions or orders, as may be amended from time to time by the City

4. Performance of all the billing in accordance with the City’s alarm ordinance, as may be amended from time to time by the City

5. Generation of the following reports including but not limited to:
a. New alarm permits issued and fees collected
b. Annual permit renewals billed and fees collected
c. Permits inactivated or revoked and reason for inactivation or revocation d. Permits reinstated and reason for reinstatement
e. Number of false burglar alarms
f. Number of false burglar alarms billed and fees collected g. Number of false robbery alarms
h. Number of false robbery alarms billed and fees collected i. Number of reinstatement fees billed and fees collected j. False burglary and/or robbery alarms for permit owners k. False burglary and/or robbery alarms for non-permitted owners l. Suspension or revocation Report for permit holders as per ordinance, if applicable

301 of 336

11 6. System functionality to capture the following information:
a. Permit number
b. Permit issue date
c. Permit expiration date
d. Permit type (residential / commercial)
e. Name of business or residential permit holder
f. Site
1) Street address and zip code of property
2) Type of property (residential / commercial)
3) Telephone numbers
4) Contact persons (minimum of 2) and phone number(s)
5) Type of alarm system installed (burglary, panic, robbery) g. Billing
1) Name
2) Full mailing address (includes zip code)
3) Contact person and phone number(s)
h. Permit Holder Responsible for Alarm
1) Name
2) Complete mailing address
3) Phone numbers
i. Name and telephone number of alarm monitoring company j. Name and telephone number of company that installed the alarm system k. Special Medical Concerns
l. Pet Information

7. System functionality to generate notices to alarm users without permits

8. Transfer on line and/or via magnetic media a skeleton version of entire registration database from FAMS system to RMS including the following:
1) Permit number (or non-permitted identifier)
2) Name of permit holder
3) Location of permit holder
4) Permit status
5) Expiration date
6) Last false alarm incident date and time
7) Alarm type (i.e., burglar, panic, etc.)
8) False alarm incident count

9. Transfer on line and/or via magnetic media incident records from RMS to FAMS including:
1) Incident number
2) Priority
3) Call code
4) Disposition

302 of 336

12 5) Date
6) Time:
(a) Received
(b) Dispatched
(c) Arrived
(d) Cleared
7) Remarks
8) Site name and address
9) Reportee name, address, phone number
10) Dispatcher- employee number and terminal
11) Phone clerk - employee number and terminal
12) Cleared code and disposition (true/false)
13) Officer number
14) Unit(s) assigned
Collection requirements and provisions:

PM AM will design, implement and maintain a system to serve as the billing and collections agent and accounts receivable (A/R) manager for the City Alarm Program Administration and Collection Service.

PM AM will provide all hardware, software, materials, supplies, space, and staff resources as required.

The system will meet the following collection specifications:

1. Bill format will provide stub or appropriate remittance form to accompany payment.

2. Bill format, permit forms, envelopes and related correspondence will identify the location of a PM AM staffed and maintained office so the customer may have the ability to obtain direct answers to questions about their bills and related false alarm system information.

3. All bills, correspondence and related matters will be approved by the City.

4. Bills will be due in time lines specified in the ordinance and or rules and regulations as appropriate.

5. Records of bills will be retained by PM AM to apply to Account Receivable system (A/R) to be maintained by PM AM.

6. PM AM will develop an A/R file, which the City will have access to review at any time.

7. System functionality for t he City to print a bill for customers wis hing to make payments at the walk in cashier location(s) of the City and to provide on- line information to PM AM regarding such payments so that PM AM can maintain A/R file.

8. PM AM will provide the ability for customer to pay on-line, by mail and via walk-in cashier.

9. Payments made by mail will be directed to a P.O. Box address in Texas maintained and managed by PM AM, unless and until the City directs that such payments be directed to a lock box address established by the City.

10. PM AM system will track NSF o r insufficient fund check occurrences and occurrences where customer stop payments have been ordered.

11. PM AM will provide system for billing the customer for the appropriate NSF or insufficient fund check fee charges and charges for stop payment situations.

303 of 336

13 12. Notwithstanding the foregoing, the Services provided hereunder do not extend to any debt collection activities in the event the property owner does not pay the amount of the invoice submitted by PM AM . Any such debt collection activities shall be perform ed by an independent contractor selected either by (i) PM AM with the prior written consent of the City or its designee, or (ii) the City or its designee or agent upon written notice to PM AM.

Processing:

PM AM shall provide the services covered under this Agreement and Scope from its offices in Texas and make available hardware and software and services necessary to establish and provide the Alarm Program Administration and Collection Service.

PM AM's Obligation:

In addition to the above, PM AM shall:

1. Maintain the proposed equipment, hardware , and software, documentation, and support services for the equipment installed, including the timely incorporation of all engineering changes.

2. Supply the City with an interface document describing the type, size, location, and medium of transfer from the City RMS.

3. Defer to the City regarding the waiver of any false alarm fee incurred where there is question about the validity of any response or action taken by an employee(s) of the City regarding a specified alarm call.

4. When possible, reports shall be produced based on the entry of variable parameters. Threshold fields shall allow a specific date range or other criteria. When possible, all report searches, shall allow for multiple parameters.

Training

1. PM AM shall provide training for the City and Police employees. Training shall be conducted in several sessions on an as needed basis.

System Coordination

1. PM AM shall coordinate with t he City’s Finance Department, Information Services and the City Police Department to develop a system that will allow walk-in payments under the Agreement.

2. PM AM shall provide during the life of the Agreement on- going computer hardware, software support and maintenance to ensure uninterrupted operation. In the unlikely event of interruption, PM AM will make best efforts to restore service within seventy-two (72) hours

3. PM AM under this A greement shall establish and provide public education, awareness and information regarding the City’s Alarm Management Program.

Exhibit “B”
Pricing and Receipt of Collections
This is a revenue sharing contract. PM AM shall retain the percentages and amounts listed in the table below of all collections and remit the percentage balance and amounts listed in the table below to the

304 of 336

14 City for the total of the actual revenues generated and collected for the City during the life of this Agreement including all adjustments for:
a. Alarm permit and renewal fees;
b. False alarms violation fee above a mandated limit;
c. Reinstatement fees;
d. Late fee for false alarms, permit fees and renewal fees e. Other charges imposed by the City in relation to the City’s f. Alarm Program Management and Collection Services
(except for criminal penalties).

City of San Bruno________

PM AM Corporation

50%

50%

The City and PM AM shall share the revenue generated from fees, fines, and penalties as described above; provided that all bank charges and mailing fees incurred in connection with the Services render ed under this Agreement by PM AM shall be paid by the program before the foregoing split of fees.

In order to facilitate the sharing of revenues as set forth above, the City authorizes PM AM to open a P.O.

Box and bank account on the City’s behalf.

The City shall pay PM AM a $10 processing fee for each refund check processed by PM AM through the Program (the “Processing Fee”) promptly upon receipt of an invoice from PM AM for such Processing Fee.

In addition, the City shall reimburse PM AM for its out-of-pocket postage expenses incurred by PM AM in performing its se rvices to the City hereunder promptly upon receipt of an invoice from PM AM for such postage expense. At the election of PM AM , PM AM may submit an invoice to the City for such postage expense or Processing Fee and deduct and offset such amount (s) from the percentage amount to the City hereunder.

PM AM reserves the right to renegotiate this pricing should the City change the fee schedule for the false alarm ordinance.

In recognition of the fact that PM AM’s Services under the Agreement and the expenses incurred by PM AM in performing such Services are incurred in advance of PM AM receiving a percentage of the fees collected under this Agreement and that the City shall have the benefit of such work as may have been completed up to the time of such termination, City agrees to continue to pay PM AM its percentage of fees collected for a period of 90 days after the termination of this Agreement on fees collected during such period that are attri butable to amounts billed by PM AM to permit holders prior to the date of termination of this Agreement. This provision shall survive the termination of this Agreement.

305 of 336

15 The share of the revenues payable to PM AM and the City in accordance with the provisions of this Exhibit B shall be determined and paid monthly within 15 days after the end of each calendar month during the Term hereof based upon the amount of collections during the immediately preceding calendar month, adjusted for any outstanding author ized reimbursements or expenses payable to PM AM in accordance with the terms of this Agreement.

306 of 336

City Council Agenda Item
Staff Report

CITY OF SAN BRUNO
DATE: August 25, 2026
TO: Honorable Mayor and Members of the City Council
FROM: Alex D. McIntyre, City Manager
PREPARED BY: Nick Pegueros, Administrative Services Director & CFO SUBJECT: Community Benefit Fund Update
BACKGROUND:

The purpose of this item is to provide the City Council with an update on the Community Benefit Fund as of June 30, 2026, including its funding sources, prior Council-directed uses, and remaining balance.

The Community Benefit Fund includes revenues received in connection with major development projects that are separate from the City’s standard development impact fee programs. Most notably, the fund received approximately $24.5 million in community benefit contributions under the YouTube Development Agreement and approximately $10.3 million under the Southline Transportation and Infrastructure Municipal Services Agreement. These revenues are distinct from development impact fees and are available for appropriation by the City Council, subject to the terms of the applicable agreements.

The YouTube/Bayhill campus expansion is the principal source of the fund’s historical activity.

As part of the initial phases of that project, the City received a single payment of approximately $55.0 million that included development impact fees, affordable housing impact fees, prepaid charges for future City services, and approximately $24.5 million designated for community benefits. Because these separate revenue categories were transmitted together, this report distinguishes the community benefit portion from revenues that are legally or administratively restricted to specific purposes.

DISCUSSION:

YouTube/Bayhill Payment Structure
The approximately $55.0 million YouTube/Bayhill payment was structured to advance several City objectives: mitigate development-related infrastructure impacts, support affordable housing, prepay certain City services, and provide community benefit resources for Council-directed priorities. The payment was deposited into the appropriate funds based on its underlying purpose, including citywide and Bayhill-specific impact fee funds, an affordable housing impact fee fund, the Community Benefit Fund, and a credits-on-hold account.

Of the total payment, approximately $24.5 million was deposited into the Community Benefit Fund. The remaining balance consisted of development impact fees, dedicated affordable housing impact fees, and prepaid service charges. These funds are governed by separate legal, 307 of 336 Item 7a.

Honorable Mayor and Members of the City Council
August 25, 2026

Page 2 of 6 ends

accounting, and policy requirements and are not available for general community-benefit purposes.

Account
Amount
Deposited Classification
Utilities Facilities Impact Fee Fund $1,271,632 Development impact fee Public Safety Facilities Impact Fee Fund $426,336 Development impact fee General Government Facilities Impact Fee
Fund
$691,578 Development impact fee
Transportation Facilities Impact Fee Fund $5,149,372 Development impact fee Community Facilities Impact Fee Fund $6,392,975 Development impact fee Bayhill Specific Plan ADIF $4,278,488 Development impact fee Affordable Housing Impact Fee $9,704,825 Affordable housing impact fee Credits on Hold $2,592,484 Prepaid future City services Community Benefit Fund $24,454,580 Community benefit
contribution
Total YouTube Development Agreement
Payment $54,962,274
Development Impact Fees — $27.9 million
Approximately $27.9 million of the YouTube payment was allocated to the City’s citywide and Bayhill-specific development impact fee programs. These amounts include fees for utilities, public safety, general government, transportation, community facilities, the Bayhill Area Development Impact Fee program, and affordable housing.

Development impact fees are governed by the California Mitigation Fee Act and the City’s implementing ordinances. They may only be used for capital facilities and improvements identified in the applicable nexus studies that expand the City’s capacity to serve new development. Eligible uses may include new facilities or expansions to existing facilities; they do not include correcting existing deficiencies, ongoing operating costs, or General Fund support.

Accordingly, these revenues are maintained and reported separately in the applicable impact- fee funds. Their use is subject to the statutory nexus, accounting, reporting, and expenditure requirements applicable to development impact fees and is outside the scope of this Community Benefit Fund update.

Prepaid Charges for City Services — $2.6 million
The YouTube payment also included approximately $2.6 million in prepaid service charges recorded as credits on hold. These amounts represent advance payments for future City services associated with subsequent phases of the project, including building permits, inspections, planning review, plan check, and engineering services.

The credits function as a project-specific drawdown account. As the City provides services, the applicable charges will be applied against the available credit balance and recognized as revenue at that time. Until services are performed, the amounts remain unavailable for discretionary appropriation or other City purposes.

308 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 3 of 6 ends

YouTube Community Benefit Contribution — $24.5 million
The Community Benefit Fund was established to generate benefits for the San Bruno community as a whole. The policy was based on value capture: where City land-use decisions provide additional private development opportunity and increase property value realized by a private property owner, a portion of that value may be directed to public facilities, services, amenities, or other Citywide priorities.

Community benefit contributions from YouTube were intentionally structured to be separate from project mitigation measures, development impact fees, affordable housing impact fees, permit charges, and other customary development obligations. Whereas those charges address the direct effects and facility demands of new development, community benefit payments are intended to provide flexible resources for broader community priorities, as determined by the City Council.

Southline Settlement Proceeds — $10.3 million
In June 2022, the City entered into a Transportation and Infrastructure Municipal Services Agreement with Lane Partners, developer of the Southline project in South San Francisco.

Although the project is located outside San Bruno, it is adjacent to the City and was anticipated to affect San Bruno’s transportation network, including traffic operations, bicycle and pedestrian facilities, and related municipal services.

Under the agreement, the developer agreed to pay the City $10.6 million, subject to a potential credit of up to $278,000 for construction of a portion of the Huntington Cycle Track, a net of $10.3 million. The payment was due concurrently with the City’s issuance of the encroachment permit needed for the Huntington Avenue/Sneath Lane intersection improvements. The agreement was negotiated in connection with the City’s issuance of required approvals and the resolution of potential disputes concerning Southline transportation impacts.

The agreement provides the City discretion regarding the uses of funds including selection, timing, and amount of funding for eligible transportation-network improvements identifies a range of transportation-network purposes, including intersection modifications, bicycle and pedestrian facilities, street beautification, capital-cost escalation and contingency, and police traffic-control measures. Additional information on conceptual uses of the Southline funds are provided in Attachment 1. The City has already appropriated $1.5 million in Southline funds for City contributions to the Huntington Cycle Track CIP.

The proceeds are held in the Community Benefit Fund but are a source separate from the YouTube community benefit payment. They are not development impact fees governed by the Mitigation Fee Act. Expenditures should therefore be presented and tracked separately from both the YouTube contribution and the City’s DIF funds and remain subject to the agreement and future Council appropriation.

Recommended Expenditures
Consistent with the City’s past fiscal practice, staff recommend that one-time revenues be directed to one-time purposes, such as capital improvements, deferred maintenance, debt reduction, reserve contributions, or other non-recurring strategic investments. Appropriation of Community Benefit Fund resources remains a policy decision for the City Council; however, this approach reflects a core municipal-finance principle: recurring programs and ongoing service levels should be supported by revenues that are recurring and sustainable over time. The Government Finance Officers Association similarly recommends that governments maintain

309 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 4 of 6 ends

structural balance by ensuring recurring revenues are sufficient to support recurring expenditures and by using one-time revenue for non-recurring expenditures.

Using a non-recurring resource to establish or sustain an ongoing service creates a future fiscal obligation when that resource is exhausted. At that point, the City must either identify replacement revenue, reduce service levels, or draw upon reserves. Maintaining a clear distinction between recurring and one-time resources protects the City’s long-term structural balance and preserves Council flexibility to use available Community Benefit Fund resources for high-value investments without creating unfunded ongoing commitments. The following details the uses of the Community Benefit Fund monies:

1. Past action: CityNet and Stormwater Enterprise Stabilization – On February 27, 2024, the City Council authorized the use of Community Benefit Fund resources to resolve accumulated negative equity in the CityNet and Stormwater Enterprise Funds.

Following completion of the City’s June 30, 2023 Annual Comprehensive Financial Report, auditors recorded interfund advances from the General Fund to address the funds’ combined negative cash position of approximately $16.7 million. Those advances had not been separately authorized by the City Council and, by themselves, did not fully resolve the enterprise funds’ negative equity positions.

To address these accumulated obligations, the Council authorized transfers totaling $23.67 million from the Community Benefit Fund: $21.5 million to CityNet and $2.17 million to Stormwater. These transfers eliminated the negative equity positions as of June 30, 2023, replaced General Fund backstop exposure with a one-time resource, and allowed the City to address the financial condition of both enterprise operations through a defined Council action.

The City subsequently identified CityNet’s fiscal sustainability as a priority initiative, conducted a competitive process to evaluate new ownership options, and approved a letter of intent with Comcast after receiving a qualified acquisition proposal. The subsequent sale of CityNet to Comcast was the most fiscally prudent path because CityNet lacked the financial resources needed to make the substantial and continuing investment required to remain competitive, including investment in fiber-to-the-home infrastructure. The Community Benefit Fund transfer was therefore a one-time transition measure; it did not establish an ongoing subsidy for CityNet operations.

These actions demonstrate the City’s proactive approach to identifying and resolving enterprise-fund deficits and associated General Fund interfund advances rather than allowing those obligations to remain unresolved at the expense of the General Fund.

The decision to use Community Benefit Fund to replenish the General Fund’s unassigned fund balance, together with the City’s broader financial-management practices, has supported the City’s strong credit profile and AAA bond rating. The resulting favorable borrowing terms on the recent Measure Q bond issuance produced meaningful savings for San Bruno taxpayers.

2. Future action: Available Community Benefit Fund as of June 30, 2026 and Pending CityNet Fund closure addition – As of the preliminary June 30, 2026 close, the Community Benefit Fund had an available balance of approximately $0.1 million. Staff also estimate that approximately $2.9 million may be returned to the Community Benefit Fund upon completion of the CityNet Fund closeout. The estimated $3 million will be

310 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 5 of 6 ends

available for consideration in the 2027-28 Capital Improvement Program budget development process.

The amount of Community Benefit funds available for the upcoming budget process is dependent on CityNet’s final disposition. At the unaudited June 30, 2026 soft close, the CityNet Fund held approximately $9.4 million in cash, consisting of the $8.0 million CityNet sale proceeds and residual resources from the prior Community Benefit Fund transfer. The fund also carried approximately $6.5 million in pension liabilities associated with former CityNet employees.

As part of the year-end close, staff is calculating the final CityNet pension liability and allocating that liability among the funds and departments that now employ the impacted former CityNet employees. Because a substantial portion of the liability is expected to transfer to the General Fund, the Council will need to determine whether CityNet cash should accompany the related pension obligation. If the preliminary balances remain unchanged and the cash and associated liabilities transfer to the General Fund, approximately $2.9 million in residual CityNet cash could be transferred back to the Community Benefit Fund. Staff will return to the City Council with final balances, the proposed liability allocation, and recommended actions as part of the June 30, 2026 ACFR presentation.

3. Future action: Southline funds – $9.5 million remain in Southline proceeds and accumulated investment earnings remain available for Council appropriation. As part of upcoming Capital Improvement Program development, staff will evaluate whether there are needed transportation-network projects that currently lack an identified funding source and can be advanced based on available resources and the City’s capacity to deliver the work. Attachment 1 provides additional background on conceptual Southline settlement expenditures.

This report transmits accounting of the Community Benefit Fund’s major revenue sources, prior appropriations, and remaining resources as of June 30, 2026. The report also distinguishes those discretionary resources from restricted funds paid by YouTube for development impact fees, affordable housing fees, and prepaid service charges that are legally or administratively restricted to specific purposes.

Consistent with the City’s financial practices and practice of adopting a balanced budget, future appropriations of Community Benefit Funds would prioritize one-time investments that advance community priorities, address long-term liabilities, or deliver eligible transportation improvements, while avoiding new ongoing obligations that would require continuing revenue support after these nonrecurring resources are exhausted. Staff will return to Council through the FY 2025–26 ACFR and upcoming Capital Improvement Program process with the information and recommendations needed for future action on CityNet residual cash and Southline proceeds.

FISCAL IMPACT:

There is no fiscal impact.

311 of 336

Honorable Mayor and Members of the City Council
August 25, 2026

Page 6 of 6 ends

ENVIRONMENTAL IMPACT:

The action is not a project subject to CEQA.  City Council’s action is not considered a “Project” per CEQA Guidelines and therefore no further environmental analysis is required.

RECOMMENDATION:

Receive update on Community Benefit Fund as of June 30, 2026.

ALTERNATIVES:

None.

ATTACHMENTS:

1. June 14, 2022 Staff Report

312 of 336

City Council Agenda Item
Staff Report

CITY OF SAN BRUNO
DATE: June 14, 2022
TO: Honorable Mayor and Members of the City Council
FROM: Jovan D. Grogan, City Manager
PREPARED BY: Matthew Lee, Public Works Director
SUBJECT: Adopt Resolution Authorizing the City Manager to Execute the Transportation and Infrastructure/Municipal Services Agreement for the Southline Project
BACKGROUND: The terms of the Transportation and Infrastructure / Municipal Services Agreement for the Southline development project were considered by the San Bruno City Council at its May 24, 2022 Study Session. A detailed staff report was prepared and posted on- line for public review. This report summarizes the information in the May 24 report, but the detailed report can be accessed through the following link: City Council Study Session Staff Report (https://www.sanbruno.ca.gov/AgendaCenter/ViewFile/Agenda/_05242022-1588).

This item is being returned to provide responses to questions asked by the City Council on May 24, 2022, and to request City Council take action on approving the Transportation and Infrastructure / Municipal Services Agreement for the Southline project prior to City of South San Francisco project approvals anticipated in July 2022 so that the City of San Bruno can receive up to $10.6 million in developer contributions toward various San Bruno transportation projects.

This Background section will provide a high-level summary of the Southline development project and why this project which is in the City of South San Francisco is being brought before the San Bruno City Council.

The proposed project will be built in the City of South San Francisco, near the Tanforan Shopping Center by Lane Partners (“Developer”). Full build out includes a new office/research and development (R&D) campus with a maximum anticipated building area of up to 2.8 million square feet (see Attachment B – Site Plan). The proposed project would demolish all existing on-site industrial warehouse uses and construct commercial office, life science, research and development, and mixed-use buildings. Commercial building heights would range from four to seven stories subject to a maximum height of 120 feet. A three-phase development process for buildout of the project is anticipated, with Phase I consisting of approximately 700,000 square feet of office and a parking structure with 1,100 parking spaces.

Access will be provided by constructing a new east-west connection road (Southline Avenue) between Huntington Avenue and Linden Avenue through the middle of the site. The existing driveways and other accesses of the current industrial uses to Tanforan Avenue will be removed and replaced with a linear parklet in a substantial setback. The new road will require new intersections at Huntington Avenue on the west side of the new road and Linden Avenue on the east side.
3 of 26313 of 336 ATTACHMENT 1
Honorable Mayor and Members of the City Council
June 14, 2022

Page 2 of 8 ends

2 5
4 A portion of the new intersection with Huntington Avenue is within the City of San Bruno (see Attachment C – New Huntington Intersection Plan). As such, the City of San Bruno has approval authority over the newly proposed intersection at Huntington Avenue.

DISCUSSION: All development project approvals will be issued by the City of South San Francisco (SSF) except for an encroachment permit from the City of San Bruno and Bay Area Rapid Transit (BART) approvals required to construct a portion of the new Huntington Avenue intersection. Approvals from other utility agencies may also be required. Development associated with the proposed project will be implemented under the proposed SSF Specific Plan, which will establish new land use development standards and design guidelines for the project site.

This Discussion section will first describe the BART and City of San Bruno approvals that are needed for the new intersection at Huntington Avenue. The major provisions of the Transportation and Infrastructure / Municipal Services Agreement that if approved would allow for the construction of the intersection and provide for $10.6 million of developer contribution to the City of San Bruno toward transportation projects will be discussed next. The list of transportation projects that make up the contributions is provided in the Transportation Improvements subsection. The timing of the approval for the Transportation and Infrastructure/Municipal Services Agreement, which is critical for the City to receive the $10.6 million in developer contributions, will be discussed. This section will also briefly discuss why constructing the new intersection would benefit the City.

A wide range of questions was raised by City Council during the May 24, 2022 meeting.

Responses to those questions are provided as an attachment to this staff report (see Attachment E). A major discussion item was related to public outreach and community engagement. This Discussion section will summarize the extensive outreach efforts made by City staff and the developer related to the project and proposed intersection.

Bay Area Rapid Transit (BART) Approvals
BART owns two parcels required for the new intersection. The existing Huntington Avenue right of way (ROW) in the area of the new intersection is owned by BART, and San Bruno has rights to have the road transferred in fee title. The City is in the process of acquiring this ROW from BART as part of the Huntington Avenue Cycle Track Project. The second is a triangle shaped parcel near Centennial Trail. Acquisition of the triangle parcel will be the responsibility of the developer. both of these acquisitions must be completed, or interim encroachment permits granted by BART, before the City can issue a City encroachment permit to the developer to construct the new intersection. It is estimated the ROW acquisitions and/or encroachment permits will not be completed with BART until winter of 2022-23.

San Bruno Approvals
The City of San Bruno will need to issue an encroachment permit to allow a portion of the new Huntington Avenue intersection to be constructed in San Bruno and to connect to San Bruno streets. This encroachment permit will be part of an Improvement Agreement which sets forth the detailed design of the new intersection and conditions that must be met as part of the construction process (e.g., utilities, traffic control devices, hours of construction). 4 of 26

314 of 336

Honorable Mayor and Members of the City Council
June 14, 2022

Page 3 of 8 ends

2 5
4 In addition, the City of San Bruno can challenge the project EIR based on the impacts of the project to San Bruno residents, with the primary concern being the traffic/transportation impacts to San Bruno intersections. Traffic analyses revealed Level of Service (“LOS”) impacts to five intersections which could be mitigated through intersection improvements (see Attachment D). It was determined that those intersections that were identified as deteriorating to unacceptable levels would do so with or without the project due to future regional growth. The Transportation and Infrastructure / Municipal Services Agreement, if approved, would provide funds to make the improvements at various intersections in San Bruno to return them to acceptable LOS. The total cost of constructing these mitigation improvements is $2.695 million. The total payment included a cost escalation and contingency contribution for capital projects in the amount of $480,000 (see Table 1).

The project EIR evaluated the project with and without the new intersection. San Bruno staff and consultants retained on behalf of San Bruno determined that installing the intersection was preferable because traffic would be directed to the main arterial streets rather than narrow local roads. Approving the Transportation and Infrastructure / Municipal Services Agreement would allow for the construction of this new Huntington Avenue intersection, as well as provide San Bruno with $10.6 million in developer contributions.

Transportation and Infrastructure / Municipal Services Agreement Provisions The Developer is responsible for paying the cost of the new Huntington Avenue intersection through negotiations with City staff. In addition to paying for the new intersection improvements, Lane Partners has agreed to make a payment to the City of San Bruno for $10.6 million at the time the encroachment permit is issued for the new Huntington Avenue intersection improvements located in San Bruno.  In exchange, the City would not challenge the project approvals, whether through litigation or otherwise. The Developer payment is based on the transportation projects as set forth in Table 1. The payment will be made under certain conditions set forth in Transportation/Infrastructure Municipal Services Agreement. This agreement requires San Bruno City Council approval, and once approved the subsequent Improvement and Maintenance Agreements and encroachment permit will be ministerial approvals by staff.

The Transportation and Infrastructure/Municipal Services Agreement will need to be approved prior to the actions of SSF City Council to approve the project design and EIR scheduled for July 2022 for the City of San Bruno to receive $10.6 million in developer contributions.

The major provisions of the agreement are as follows:
 The SSF project approvals include the preparation of an EIR. The EIR identifies intersections, bicycle paths, pedestrian ways and transit systems and services in San Bruno that may be adversely affected directly or indirectly by development and occupancy of the Project.
 The City and Developer have a shared interest in the efficient management of traffic and operation of the San Bruno transportation network and have agreed to work together to promote that interest by entering into a Transportation and Infrastructure/Municipal Services Agreement (“Agreement”) to fund improvements to the San Bruno transportation network, and resolve any dispute they may have regarding the LOS traffic impacts of the Southline Project.
5 of 26

315 of 336

Honorable Mayor and Members of the City Council
June 14, 2022

Page 4 of 8 ends

2 5
4  As consideration for the City’s issuance of an encroachment permit authorizing the San Bruno roadway project improvements, Developer shall pay the City $10,600,000, which the City in its sole discretion may use to fund improvements to the San Bruno Transportation Network (set forth in Table 1). The Developer’s transportation funding contribution shall be payable concurrently with the City issuing the encroachment permit to the Developer.
 A portion of the $10.6 million is for funding the gap in the Huntington Cycle Track project.

A portion of the Huntington Cycle Track project may be built by the Developer at the time the new intersection is developed. If this occurs the Developer will be subject to a maximum credit of $278,000 against the $10.6 million payment obligation.  The Developer shall apply for and obtain the San Bruno approvals prior to starting any core and shell construction work on the Project.
 The City has determined that changes to the San Bruno General Plan Transportation Element are required but are relatively minor, and the City intends to process such amendments as part of a future General Plan amendment.
 Property interests in two Bay Area Rapid Transit Agency (“BART”) parcels must be acquired before San Bruno issuance of an encroachment permit for the new intersection.

The parcels require two separate and different acquisition processes which may be on different schedules. The City’s issuance of the encroachment permits may be delayed pending completion of the two BART property transfers, or issuance of interim encroachment permits by BART. As a result, the Developer payment of $10.6 million will also await the BART ROW transfers or encroachment permits, estimated to occur in 2023.
 The City currently is considering certain improvements to the San Bruno Transportation Network (set forth in Table 1), and may consider additional or different improvements in the future. All decisions regarding selection of the improvements to be implemented, provision and timing of the improvements, and the amount of funding provided by the City for such Improvements, shall be in the City’s sole discretion, with the exception of the credit for partial construction of the Cycle Track to be completed by the Developer as part of the new intersection improvements.
 In consideration of payment of the $10.6 million transportation funding contribution, the City agrees that it will not authorize or undertake any opposition to the project including file any opposition or seek any legal remedy in connection with approval by SSF of the Project.
 In the event the Developer decides (after the Transportation/Infrastructure Municipal Services Agreement is executed) to redesign the project without the new intersection, the Developer will be obligated to pay the City an alternative access payment not less than $2 million and no more than $6.5 million (instead of the $10.6 million payment). The amount will be determined by negotiation between the City and Developer based on a traffic analysis of LOS intersection impacts as a result of the dispersal of traffic without the benefit of the new intersection. This is to ensure the traffic mitigations are paid for even though the City is not issuing an encroachment permit for the new intersection under this alternative. It is unlikely the Developer would choose not to build the new intersection even though it reduces the payment to the City, as the intersection is very 6 of 26

316 of 336

Honorable Mayor and Members of the City Council
June 14, 2022

Page 5 of 8 ends

2 5
4 important for vehicular circulation to and from the project and provides better access to the transit stations which helps implement their Transportation Demand Management (TDM) Program. This improved access will be important for leasing to prospective tenants.
 There are default and remedy provisions
Transportation Improvements
The transportation improvements consist of projects that are part of the development or adjacent to it, and offsite improvements within San Bruno that mitigate traffic impacts.

Project Specific Improvements being funded by the Developer consist of the following:
 Construction of the new Huntington Avenue intersection. This intersection will also improve access to the Tanforan Center, which is under new ownership and proposed for redevelopment.
 Reconstruction of the Tanforan Avenue and South Maple intersection to reduce traffic on Tanforan Avenue by closing access to South Maple Avenue. This project will also include undergrounding of overhead utilities on Tanforan Avenue.

Offsite San Bruno Improvements: Staff and the developer discussed various traffic mitigation improvements as well as bike and beautification improvements in the vicinity of the project. The total project and services list discussed is summarized in Table 1:

Table 1. Southline Transportation Improvements

PROJECT ESTIMATED COST
Intersection Modifications - Traffic Mitigations
Sneath/280 Ramp- Intersection geometry modification $1,700,000 San Bruno / Cherry Intersection - signal & geometry
modifications $460,000
El Camino/ Sneath Intersection - signal equipment/timing $55,000 Huntington/Herman Intersection - signalize intersection $460,000 El Camino/ San Bruno Intersection - signal timing modifications $20,000 Sub Total Intersection Improvement Projects $2,695,000

Street Beautification & Bicycle Projects
Bayshore Circle Median - Landscaping $1,600,000
Huntington Cycle Track Phase 2 Funding Gap $4,200,000
Sub Total Street Beautification & Bicycle Projects $5,800,000

Additional Cost Escalation/Contingency Contribution for Capital Improvements $480,000
Other Transportation Projects
7 of 26

317 of 336

Honorable Mayor and Members of the City Council
June 14, 2022

Page 6 of 8 ends

2 5
4 PROJECT ESTIMATED COST
Police Department Traffic Control Measures $1,625,000

Total Project Commitments and Additional Funding $10,600,000 The $10.6 million developer contribution covers the cost of $2.695 million in intersection improvements, $5.8 million in related street beautification and bicycle projects, $480,000 in contribution toward cost escalation and contingency of capital improvements, and $1.625 million lump sum payment for Police traffic control measures costs.

May 24, 2022 Questions and Public Outreach / Community Engagement San Bruno City Council asked a range of questions on the project during the May 24, 2022 study session. Responses to questions are provided in Attachment E. Heightened interest was on the public outreach and community engagement by staff and the developer.

Between May 2020 and June 2022, and including the meeting presenting this agenda item, the City of San Bruno, the Developer, or SSF hosted 8 meetings where the San Bruno community was noticed and invited to attend. Attachment F provides the list of meetings, the dates, and brief discussion of the meeting that have occurred. Attachment F also shows a pre-construction meeting the Developer plans to host on June 22, 2022 with the public in response to feedback regarding construction impact concerns. It is anticipated SSF will consider approving the Southline project in July 2022.

Two meetings for San Bruno residents were held recently to present plans for the project, explain potential impacts, and request input on design of the Tanforan Avenue linear parklet, and a parking program. A more detailed summary of these meetings can be found in the staff report for the May 24 City Council Study Session.

The first meeting on April 20 focused on Tanforan residents because they are closest to the project and will be most affected by the new buildings and linear park. This meeting presented design options for the linear park (e.g., community garden, play structure, etc.) and allowed residents to “vote” on their preferred elements. Ten residents attended this in-person meeting, and the project generally was well received. Parking surveys were hand delivered to approximately 100 residences closest to Tanforan Avenue bordered by Huntington Avenue East, Tanforan Avenue, Bayshore Circle North, and Herman Street.

The second meeting on May 3 invited a wider geographic area of residents and focused more on transportation improvements, impacts and mitigations, and was conducted on an electronic video meeting platform to allow greater participation. Notices were mailed to approximately 325 residences and business bordered by Huntington Avenue East, Tanforan Avenue, San Mateo Drive and I-380 freeway. This meeting was attended by approximately 25 residents, including several San Bruno City Council Members and a Planning Commissioner. A summary of the comments and questions are set forth in the report for the May 24 Council Study Session. The overall tone of the meeting was positive, with expressions of appreciation for the meeting and the planned improvements.

In addition to the public informational workshops, the City and the Developer has conducted multiple outreach efforts regarding this project in English and Spanish. In addition, this project 8 of 26

318 of 336

Honorable Mayor and Members of the City Council
June 14, 2022

Page 7 of 8 ends

2 5
4 has been posted on both the San Bruno’s and SSF’s Development webpages, and the Developer has maintained the Southline coUrbanize webpage as a forum to provie updates on the project and receive feedback from the public.

Finally, the City has conducted targeted outreach for this June 14 Council agenda item and sent out notification mailer notices to San Bruno approximately 325 residents and businesses previously noticed, and an additional approximately 30 parcels that were identified to be within a 1000-foot radius of the intersection, with mailers provided in English, Spanish, Chinese, Japanese, Tagalog, Hindi, Arabic, and Russian. The Developer hand delivered notices door to door to the approximately 100 residences closest to the project. San Bruno posted the meeting notice on its social media sites and emailed participants of in-person meetings that provided email addresses, as well as those who provided email addresses as part of survey responses.

More information regarding the City’s outreach efforts is detailed in Attachment E.

Given the extensive outreach efforts and mailers sent regarding public meetings on the project, San Bruno residents and businesses in the area have been provided multiple opportunities to learn about the project and the proposed intersection, ask questions, and provide input. During the public meetings, feedback has been positive about the project, the developer, and the improvements on Tanforan Avenue. Staff has provided information regarding the proposed intersection and response from residents ranged from neutral to very positive.

FISCAL IMPACT: Should the Transportation/Infrastructure Municipal Services Agreement Developer be executed, the Developer would pay the City $10,600,000 (less the Cycle Track credit) when the City issues the encroachment permit for the proposed intersection at Huntington Avenue and Sneath Lane to the Developer. Although the City of San Bruno will not receive direct property tax benefits from the project, there will be positive financial benefits to the Tanforan area businesses from increased patronage by the project’s future employees.

ENVIRONMENTAL IMPACT: An Environmental Impact Report (EIR) was prepared to address potential environmental impacts including: Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities and Service Systems, and Wildfire. This report was prepared by SSF as the responsible agency.

RECOMMENDATION: Staff recommends that the City Council authorize the City Manager to execute the Transportation and Infrastructure Municipal Services Agreement for the Southline Project in substantial conformance with the foregoing terms on behalf of the City.

ALTERNATIVES: The alternative is to not approve the Transportation/Infrastructure Municipal Services Agreement which would then eliminate the Developer’s $10.6 million contribution to San Bruno transportation and beautification projects; and the new intersection at Huntington Avenue and Sneath Lane would not be constructed. However, it would not keep the project from being constructed as the traffic (as studied in the EIR) can be shifted eastward to Dollar Avenue in SSF and Herman Street in San Bruno.

If the Council does not approve the Agreement and no settlement is reached, then in order to protect the City’s interests the Council should direct staff to identify additional comments on the Project’s CEQA review and objections to the Project, and submit them to the City of South San 9 of 26

319 of 336

Honorable Mayor and Members of the City Council
June 14, 2022

Page 8 of 8 ends

2 5
4 Francisco before it considers approving the Project.

ATTACHMENTS:

Attachment A – Resolution
Attachment B – Site Plan
Attachment C – New Huntington Intersection Plan
Attachment D – Intersection LOS Maps
Attachment E – 5/24/2022 Study Session Questions and Answers Attachment F – List of Public Outreach / Community Engagement Events 10 of 26

320 of 336

1 6
2 0
RESOLUTION NO. 2022 - ___

RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE THE

TRANSPORTATION AND INFRASTRUCTURE / MUNICIPAL SERVICES AGREEMENT FOR

THE SOUTHLINE PROJECT

WHEREAS, the Developer, Lane Partners doing business as LPGS (Tanforan) LLC, has proposed a 2.8 million square foot office and lab development (“Southline Project”) in the Tanforan area within the City of South San Francisco, adjacent to the border between South San Francisco and San Bruno; and
WHEREAS, the City of South San Francisco (“SSF”) currently is considering Developer’s applications for discretionary approvals for the Southline Project, including the Southline Specific Plan, general plan and zoning amendments for implementation of the Southline Specific Plan, a precise plan for the first phase of development under the Southline Specific Plan, vesting tentative subdivision map, design review for the first phase of the Project, a development agreement, and a transportation demand management program intended to reduce the Project’s traffic generating impacts; and,
WHEREAS, as part of the Southline Project, the Developer proposes to construct off-site improvements located partly in the City of San Bruno (“City”), including redesign of roadways to create a new signalized intersection for Huntington Avenue, South Maple Avenue, and Sneath Lane (“Huntington/Southline Intersection”); and
WHEREAS, a portion of the Huntington/Southline Intersection is within the City of San Bruno and will require the issuance of an encroachment permit by the City to allow construction of the intersection; and,
WHEREAS, SSF, as Lead Agency for purposes of the California Environmental Quality Act (“CEQA”), prepared the Southline Specific Plan Environmental Impact Report (“EIR”), to analyze potential environmental impacts of the Southline Project; and WHEREAS, SSF’s consultant, Fehr & Peers, prepared the “Southline Traffic Operation Analysis” (December 2020), which summarized the effects of the Southline Project on significant elements of the roadways, bicycle paths, pedestrian ways and transit systems and services in San Bruno including impacts on intersection level of service (LOS); and Developer has provided a memorandum from transportation consultant Kimley-Horn and Associates, Inc. titled “Recommended San Bruno Intersection Improvements” (January 10, 2022) that identifies recommended improvements at five intersections to improve the identified LOS deficiencies and the associated cost estimates for such improvements; and WHEREAS, in addition to the intersection modifications described immediately above, City has requested that Developer complete or fund certain additional improvements and services to address City’s concerns about the Southline Project’s effects on the San Bruno transportation network including bicycle paths, median landscaping, and police traffic control; and,
WHEREAS, the City and Developer have a shared interest in the efficient management of traffic and operation of the San Bruno transportation network, and have agreed to work 11 of 26

321 of 336

2 6
2 0
together to promote that interest by entering into a Transportation and Infrastructure/Municipal Services Agreement (“Agreement”) to fund improvements to the San Bruno transportation network, and resolve any dispute they may have regarding the LOS traffic impacts of the Southline Project; and,
WHEREAS, the Agreement will provide for Developer to pay City $10.6 million for improvements to the San Bruno transportation network, less up to $278,000 as credit for Developer to construct a portion of the planned Huntington Cycle Track bike and pedestrian path in the City; and
WHEREAS, in exchange for Developer’s payment, City will agree to issue an encroachment permit and related ministerial approvals for Developer to construct the new Huntington/Southline intersection and related improvements in the vicinity; and, WHEREAS, in the event Developer elects to revise the Southline Project to eliminate need for the Huntington/Southline Intersection and any other improvements in the City of San Bruno, the Agreement will provide a process to determine which intersections in the City may be affected and what LOS mitigation improvements are needed, and will require Developer to pay City no less than $2 million up to $6.5 million for such improvements; and, WHEREAS, in consideration of Developer’s payment for transportation improvements, the City agrees it will not oppose, or seek any legal or equitable remedy against SSF, Developer, or third parties for the Southline Project development approvals by SSF; and WHEREAS, the City Council held a study session regarding this matter on May 24, 2022, at which it received a staff report, heard presentations by City staff and Developer, and received comments by the public, and the City Council received a second staff report for its consideration of this matter on June 14, 2022 at which meeting there was the opportunity for public comment and further deliberation by the City Council.

NOW, THEREFORE, BE IT RESOLVED, that:

A. The San Bruno City Council, after consideration of the information it received from staff reports, presentations, and public comments, hereby approves the foregoing terms for an agreement between City and Developer.

B The City Manager is hereby authorized to execute an agreement in substantial conformance with the foregoing terms on behalf of the City, and such agreement is hereby incorporated by reference in this resolution.

Dated: June 14, 2022
-o0o-
12 of 26

322 of 336

3 6
2 0
I, Vicky Hasha, Deputy City Clerk, do hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Bruno this 14th day of June 2022 by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:

Vicky Hasha
Deputy City Clerk
13 of 26

323 of 336

ATTACHMENT B

SOUTHLINE SITE PLAN
Fut ure Campus Expansion
19 acres / up t o 2.1M SF
Phase 1 +/- 700k SF
14 of 26

324 of 336

ATTACHMENT C

NEW HUNTINGTON INTERSECTION PLAN
15 of 26

325 of 336

ATTACHMENT D

INTERSECTION LOS MAPS
16 of 26

326 of 336

17 of 26

327 of 336

Page 1 of 8 ends

6 2
4 ATTACHMENT E
MAY 24, 2022 STUDY SESSION QUESTIONS AND ANSWERS
During the May 24, 2022 Study Session, the City Council had a number of questions about the Southline development project within the City of South San Francisco and the Transportation and Improvement/Municipal Services Agreement being recommended for approval between the City of San Bruno and the developer of Southline, Lane Partners. The following are responses to the Council questions.

1. Traffic generation:
a) How many vehicles are projected to enter/exit from the site? b) Do the 2040 traffic projections include YouTube and other approved San Bruno projects?
c) Is the pavement section going to be redesigned for the new vehicular load? Response a): The Project’s transportation and circulation impacts were evaluated under the Southline Environmental Impact Report (“EIR”) (State Clearinghouse #2020050452) prepared by South San Francisco, which includes a Transportation Impact Analysis prepared by Fehr & Peers that studied Project vehicle trip generation. As described under the Transportation Impact Analysis, the project [Reduced Underground Parking Alternative] would generate up to approximately 3,500 net new daily vehicle trips at Phase 1 and up to approximately 16,400 net new trips at project buildout. These trips would occur over the course of the day, with approximately half arriving at the project site and approximately half exiting the project site.

For reference purposes, the Transportation Impact Analysis for the Bayhill Specific Plan project, which was prepared by the same consultant firm as the Transportation Impact Analysis for Southline, estimated that YouTube’s Phase I development would generate up to approximately 4,000 daily trips, and buildout of the most impactful Maximum Office Scenario (approximately 2.5 million square feet) would generate up to approximately 41,500 daily vehicle trips, both without factoring in applicable Transportation Demand Management measures.

Response b): Yes, the Southline EIR cumulative transportation analysis included land use growth covered in Plan Bay Area 2040, and included the Bayhill Specific Plan project.

Given the scale of the Bayhill Specific Plan project, and the potential for both projects to share certain overlapping local and regional transportation infrastructure, the Bayhill Specific Plan project was added to the traffic model used in the cumulative transportation analysis.

Additionally, the cumulative analysis of mobile air emissions in the Southline EIR’s Air Quality and of traffic-generated Noise chapters both incorporate cumulative traffic volumes.

Response c) Yes, the reconfigured intersection will be designed to achieve or exceed industry-standard engineering criteria to accommodate the anticipated vehicle load. South San Francisco’s Conditions of Approval for the project requires that new roadways will be designed for a Traffic Index of 9.5, based on anticipated car, bus, and truck traffic, per the Transportation Impact Analysis and Caltrans highway design guidelines. This pavement section will be constructed as 6” of asphalt over 22” of aggregate base. This is a robust roadway section, typically reserved for major arterial roads in California. 18 of 26

328 of 336

Page 2 of 8 ends

6 2
4 2. Parking:
a) Will there be enough without spillover to San Bruno streets? b) Can San Bruno residents have rights to use the parking structure? Response a): The Southline campus will include adequate parking to accommodate future campus tenants and visitors. The Southline Specific Plan does not authorize parking on San Bruno streets. The Project is a transit-oriented development and will be required to implement a robust Transportation Demand Management Program, as described below, to reduce the number of employees and visitors driving to the project site and encourage usage of alternative transportation modes, based on the Project’s unique location adjacent to the San Bruno BART station and SamTrans Transit Center. Project parking will be provided onsite at a maximum ratio of 1.65 striped spaces per 1,000 square feet of commercial uses, with an option to incorporate valet parking program(s) up to 2.0 spaces per 1,000 square feet of commercial use, subject to City of South San Francisco review and approval. Additional parking within the Southline amenities building will be provided for Specific Plan area visitors and Amenities Building customers, staff, and affiliates. The Phase 1 project component will include approximately 1,095 vehicle parking spaces, in addition to 218 bicycle parking spaces.

Response b): The Southline parking structures will be available to project tenants, visitors and affiliates, and not available to the public. The City of South San Francisco zoning code does not allow for privately owned/operated parking facilities offered for public use in this area, and South San Francisco is proposing to carry through this restriction in the Southline Specific Plan. These regulations are similar to those adopted for the San Bruno Bayhill Specific Plan area, which does not permit commercial parking structures or lots available to the public. (See San Bruno Municipal Code, Chapter 12.290, Table 12.290-1: Permitted Land Uses – Bayhill Zoning Districts).

3. Construction Impacts:
a) What are the EIR mitigation measures that will be implemented to mitigate construction impacts (noise, vector control, dust, truck traffic, construction employee parking, etc.)?
b) What mechanism will be established for San Bruno staff to communicate San Bruno construction complaints to South San Francisco staff and receive updates on South San Francisco staff’s follow through?
Response a): The project’s construction impacts were evaluated throughout the Southline EIR prepared by South San Francisco. To the greatest extent feasible, construction related impacts will be reduced or avoided through implementation of the Mitigation Monitoring and Reporting Program (MMRP) prepared in connection with the EIR, in addition to compliance with other Phase 1 project Conditions of Approval. An overview of the applicable construction- related mitigation measures and Phase 1 project Conditions of Approval is provided below.

Please refer to the Southline EIR, MMRP and Conditions of Approval for a complete list, and additional information regarding Mitigation Measures applicable to development of future phases.
19 of 26

329 of 336

Page 3 of 8 ends

6 2
4 Security and Noticing:
 Condition of Approval #9: Project is responsible for maintaining site security prior to, and throughout the construction process. This includes installation of appropriate fencing, lighting, remote monitors, or on-site security personnel as needed.  Condition of Approval #10 : Project is responsible for providing site signage during construction, which contains contact information for questions regarding the construction.

Construction Worker Parking:
 Condition of Approval #11: During construction, the Project must provide parking on-site, or shall arrange for off-site parking, for construction workers. It is anticipated that all construction parking will be provided onsite.

Noise and Dust:
 Condition of Approval #12: Construction activities must be conducted to reduce to a minimum any noise vibration or dust.
 Mitigation Measure AQ-1: Require Fugitive Dust Best Management Practices - All applicants proposing development of projects within the project site, including the Phase 1 applicant, shall require their contractors, as a condition of contract, to reduce construction-related fugitive dust by implementing BAAQMD’s basic control measures at all construction and staging areas.
 Mitigation Measure NOI-1a: Applicant must develop a Construction Noise Control Plan, which includes a range of measures to reduce noise from construction activity and comply with municipal daytime and nighttime noise standards. Measures include identifying an on-site construction liaison, with information on name and telephone number through on- site signage and notices mailed/delivered to surrounding land uses. If construction noise is found to be intrusive to the community (i.e., if complaints are received), the construction liaison shall take reasonable efforts to investigate the source of the noise and require that reasonable measures be implemented to correct the problem.  Mitigation Measure NOI-1b: Applicant must construct a temporary noise barrier along Tanforan Avenue in advance of project construction in order to reduce noise impacts outside of the Project boundary and along Tanforan Avenue.

Rodent/Vector Control:
 The applicant and project general contractor intend to implement a rodent and vector control program as part of its abatement and demolition activities, as well as through project construction. This program includes an evaluation of the project site and placement of devices and measures to control rodents on the project site and the surrounding areas.

Lane Partners and the project general contractor will hold a pre-construction meeting with adjacent San Bruno properties owners and members of the public prior to commencement of construction activity. Information regarding the time and location for this meeting will be provided separately.
20 of 26

330 of 336

Page 4 of 8 ends

6 2
4 Response b): As described above, the project applicant is required to provide site signage during construction, which must provide contact information for questions regarding the construction, and also must maintain a construction liaison who is responsible for responding to construction noise complaints. Complaints that are received by San Bruno staff will be forwarded to South San Francisco staff and San Bruno staff will make an initial response to the resident that the complaint has been forwarded to South San Francisco for action.

4. What is the anticipated project/construction schedule? Response: The Phase 1 schedule is planned as follows:
 Abatement/Demo Start: July 2022
 Phase 1 Foundation Work: October 2022
 Phase 1 Steel Erection: Q2 2023
 Phase 1 Completion: Q3 2024
Future phases of the project will be built out over time driven by market conditions.

5. What streets will be repaved around the site?
Response: The conditions of approval will require the following require the Applicant to reconstruct the following streets (curb to curb) to a Traffic Index of 9.5:
a. Dollar Avenue from Tanforan Avenue to Southline Avenue b. South Linden Avenue along the Lot 5 property frontage c. South Linden Avenue from the at-grade railroad crossing to Dollar Avenue. d. Huntington Avenue from Tanforan Avenue to Sneath Avenue along the realigned Huntington Avenue right-of-way.
e. South Maple Avenue approximately 125 feet north of Southline Avenue In addition, the Applicant shall perform base repairs, and perform a 2-inch grind and AC overlay of the following streets (curb to curb):
a. Tanforan Avenue from Huntington Avenue to Dollar Avenue. b. Huntington Avenue from the southern driveway of the BART parking lot to Tanforan Avenue.
c. South Linden Avenue from the at-grade crossing to the eastern limits of the new concrete median island

6. How can San Bruno residents access the public amenities? Response: San Bruno residents can access the public amenities by walking, biking, or driving to the campus. The public amenities consist of the following:
 1-acre Tanforan Avenue parklet
 Outdoor plaza adjacent to the campus amenity building  Restaurant, coffee shop, bike repair station
21 of 26

331 of 336

Page 5 of 8 ends

6 2
4  Southline Commons, a large open space contemplated for the future phases

7. Who will oversee the proposed construction work? Who is doing the inspections? Response: The project is within South San Francisco. All building and on-site construction will be inspected by South San Francisco staff. South San Francisco staff will also be responsible for inspecting the intersection construction, and San Bruno staff or consultants retained by San Bruno will assist for that portion of the intersection within San Bruno. A cost recovery agreement with the Developer will cover the City’s expenses for any inspection or construction testing services within the City of San Bruno.

8. How will the current cost estimate account for future construction of traffic improvements and associated inflation?
Response: The $10.6 million developer payment to the City of San Bruno includes a $480,000 contingency for this purpose.

9. What will be the agreement between the two cities for new intersection and signal maintenance?
Response: A maintenance agreement between the two cities will be negotiated after the City Councils of both cities approve the project. It is not appropriate at this point to allocate staff time to these discussions until the project is approved. The agreement will include items such as mutual cooperation for determining signal timing and coordination with nearby San Bruno signals, maintenance and operation cost responsibility of future traffic signals, and pavement and striping maintenance.

10. Can San Bruno CityNet be used as the provider for cable or internet service for the project?
Response: Staff is evaluating the feasibility of use of San Bruno CityNet fiber optic services outside of the City boundary. Procedural and legal/regulatory requirements will need to be discussed between San Bruno and South San Francisco prior to determination of feasibility.

11. How will the funds for San Bruno Police Department Traffic Control Measures be used?
Response: The initial request from the Police Department is for funding for a traffic control officer as needed. The exact personnel commitment required cannot be determined until the project is built, occupied, and generating traffic. At that point the Police Department will have recommendations for police traffic control measures to supplement intersection signals if needed. In the meantime, the City will have funds from the $10.6 million developer payment to offset these potential costs.

12. Is the project going to the Traffic, Safety and Parking Committee (TSPC) for review? 22 of 26

332 of 336

Page 6 of 8 ends

6 2
4 Response: The intersection and cycle track improvements will be reviewed by the TSPC following the City Council June meeting. This will be for information only as the TSPC does not have authority over a development project in SSF, and the San Bruno intersection impacts and mitigations have been developed jointly between the two cities using three traffic engineering consultants to develop proposed traffic mitigations. When the intersection modifications are designed in detail, there will be a further opportunity for TSPC input prior to the Developer constructing.

13. Public notice:
a) What notice will be given to residents for the June Council meeting and how large of an area?
b) Will the notice be multilingual?
c) What other forms of notification are used besides a mailer? Response a): The June 14 City Council Special Meeting notice was mailed to a total of 363 businesses and residences that are either located within a 1000-ft radius from the intersection plus the outer limits of the resident meeting #2 notification area, which included all of the properties located between Tanforan Ave. on the north, San Mateo Ave. on the east, Highway 380 to the south, and Huntington Ave. on the west. (See mailing notice exhibit below for notification boundary.)
June 14th City Council Special Meeting Mailer Notice Radius Map 23 of 26

333 of 336

Page 7 of 8 ends

6 2
4 Response b): There were multiple outreach efforts during the public outreach meetings in English and Spanish, and the back of the June 14th Special City Council meeting includes information in English, Spanish, Chinese, Japanese, Tagalog, Hindi, Arabic, and Russian in effort to reach as many people as possible.

Response c): In addition to the mailed notices, the Developer walked door-to-door to all the residences on Tanforan Avenue, Atlantic Avenue, Pacific Avenue, and Bayshore Circle and Herman Street and Huntington Avenue East north of Bayshore Circle to hand out mailers for the June 14 meeting.

In addition to the mailer, the applicant has been using the Southline coUrbanize webpage as a forum to provide updates and receive feedback. Information about the project has also been posted on both the San Bruno and South San Francisco Development Activity webpages, the City has posted information about the Southline Development Community Meeting on the City’s social media outlets (Instagram, Facebook, Twitter, Nextdoor), and finally, the Development team has targeted outreach to both San Bruno residents and South San Francisco industrial tenants.

14. How will Transportation Demand Management (TDM) goals be enforced and what happens if TDM metrics are not met?
Response:

Overview: The project is subject to the South San Francisco Transportation Demand Management (TDM) Ordinance, as set forth under SSF Municipal Code Chapter 20.400. The project will be required to achieve a 45% alternative mode usage, meaning that no more than 55% of trips to the project site may be single-occupancy vehicle trips. Lane Partners has prepared and submitted a Preliminary TDM Plan to the City of South San Francisco for approval that includes a variety of services, incentives, and facilities to achieve the 45% alternative mode usage requirements. This is the highest trip reduction requirement South San Francisco has imposed on any development project.

Compliance and Enforcement: The efficacy of Southline’s Final TDM Plan(s) will be monitored based on the requirements in the South San Francisco TDM Ordinance, and additional TDM measures will be imposed in the event that the 45% mode shift goal is not achieved.
 Annual Surveys: The project must comply with on-going monitoring, including annual surveys, which will be managed by project specific TDM Coordinator(s). The initial annual survey will be submitted one year after a certificate of occupancy is granted. If the applicable portion of the project has not achieved the minimum 45% alternative mode usage, the developer must provide an explanation of why the goal has not been reached, and a description of additional measures that will be adopted in the coming year to attain the TDM goal.
 Triennial Surveys: After the initial survey, the TDM Coordinator(s) will work with South San Francisco’s Planning Division to document the effectiveness of the TDM program by measuring and reporting on the commute mode distribution at Southline every three years.
24 of 26

334 of 336

Page 8 of 8 ends

6 2
4  Lease Provisions: Leases for all tenants within the Southline Campus will include provisions regarding mandatory TDM measures, appointment of a TDM Coordinator(s), and a requirement for ongoing communications and cooperation between property managers and the TDM Coordinator(s). Leases will also identify the City of South San Francisco’s potential penalties for noncompliance based on failure to submit reports or to achieve the 45% alternative mode use. Tenants are obligated to ensure these requirements are met and to communicate proactively with property managers and the TDM Coordinator(s).

Penalties for Non-Compliance: After the initial triennial report, if the subsequent triennial report indicates that the required alternative mode use is still not being achieved, or if an applicant fails to submit a triennial report at the times described above, the City of South San Francisco may assess a monetary penalty against the applicant. The penalty shall be established by South San Francisco City Council resolution on the basis of project size and actual percentage alternative mode use as compared to the percent alternative mode use established in the trip reduction plan. Any penalties that are assessed will be used to fund implementation of additional trip reduction measures.

15. What is the landscaping plan for Huntington Avenue? Response: The conceptual plan for landscaping was presented to the City Council at the Study Session and includes the area adjacent to BART as well as the new Cycle Track.

Detailed landscape plans will be developed as part of the construction drawings for both the new intersection and the Cycle Track projects.

16. Can the streets be renamed to extend Sneath Lane to the west leg of the new intersection?
Response: Staff will confer with our surveyor and other stakeholders about best practices for street naming for the street alignment.

Conclusion
Many of the questions answered in this memorandum involve project design issues that are not within the jurisdiction of the City of San Bruno. The information above is provided to respond to San Bruno City Council questions, but San Bruno City Council approval authority will be limited to the Transportation/Municipal Services Agreement, which sets forth the developer payment to mitigate intersection impacts and provide funding for other transportation improvements such as the Cycle Track.
25 of 26

335 of 336

ATTACHMENT F

LIST OF PUBLIC OUTREACH / COMMUNITY ENGAGEMENT EVENTS
❖May 6, 2020 Community Meetings (Virtual)
❖June 11, 2020 South San Francisco CEQA Scoping Meeting (Virtual) ❖November 4, 2021 South San Francisco Planning Commission Meeting & DEIR Public Comment Meeting (Virtual)
❖April 20, 2022 Community Meeting (In-Person)
❖May 3, 2022 Community Meeting (Virtual)
❖May 24, 2022 San Bruno City Council Study Session (Virtual) ❖June 2, 2022 South San Francisco Planning Commission Meeting (Virtual) ❖June 14, 2022 San Bruno City Council Meeting (Virtual) ❖June 22, 2022 Pre-Construction Meeting (In-Person)
❖July 2022 South San Francisco City Council Meeting (Hybrid) 26 of 26

336 of 336