Packet Pg. 236 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-11 City Project No. C9823
require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and CONTRACTOR certifies that he will comply with such provisions before commencing the performance of the work of this agreement.
16. NON-DISCRIMINATION. The CONTRACTOR hereby assures that it will comply with Subchapter VI of the Civil Rights Act of 1964, 42 USC Section 2000 (e)(17), to the end that CONTRACTOR will not exclude any person from participation in, be denied the benefits of, or be otherwise subject to discrimination from any project, program, or activity supported by this Agreement, based on the grounds of race, color, national origin, sex, disability, age, or religion,. CONTRACTOR shall comply with its EEO Certification (Form PW-7). In addition, CONTRACTOR will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The CONTRACTOR will take affirmative action to insure that applicants are employed and the employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include, but not be limited to the following:
employment, advancement, demotion, transfer, recruitment, or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The CONTRACTOR shall at all times be in compliance with the requirements of the Federal Americans With Disabilities Act (Public Law 101-336) which prohibits discrimination on the basis of disability by public entities. The CONTRACTOR agrees to post in conspicuous places available to employees and applicants for employment any notices provided by the CITY setting forth the provisions of this non-discrimination clause.
17. Notice. All notices required by this Agreement shall be given to the CITY and CONTRACTOR in writing, by first class mail, postage prepaid, addressed as follows:
CITY: City of San Carlos
600 Elm Street
San Carlos, CA 94070
Attention: City Manager
CONTRACTOR: _____________________
Address
Phone
Attention: ______________
18. Non-Assignment. This Agreement is not assignable either in whole or in part.
7.j.2
Packet Pg. 237 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-12 City Project No. C9823
19. Amendments. This Agreement may be amended or modified only by written agreement signed by both parties.
20. Business Registration. CONTRACTOR agrees to comply with Chapter 5.04 of the Municipal Code and pay all fees required to be paid.
21. Validity. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.
22. Governing Law. This Agreement shall be governed by the laws of the State of California and any suit or action initiated by either party shall be brought in the County of San Mateo, California. In the event of litigation between the parties hereto to enforce any provision of the Agreement, the unsuccessful party will pay the reasonable attorney’s fees and expenses of litigation of the successful party.
23. Mediation. Should any dispute arise out of this Agreement, the parties shall meet in mediation and attempt to reach a resolution with the assistance of a mutually acceptable mediator. Neither party shall be permitted to file legal action without first meeting in mediation and making a good faith attempt to reach a mediated resolution. The costs of the mediator, if any, shall be paid equally by the parties. If a mediated settlement is reached neither party shall be deemed the prevailing party for purposes of the settlement and each party shall bear its own legal costs. If a party refuses or fails to participate in mediation in good faith prior to filing a lawsuit, then that party shall be barred from recovery of attorneys fees and costs of suit.
24. Conflict of Interest. CONTRACTOR may serve other clients, but none who are active within the City of San Carlos or who conduct business that would place CONTRACTOR in a "conflict of interest" as that term is defined in State law.
25. Entire Agreement. Each party acknowledges that this agreement, the exhibits hereto, and the documents incorporated by reference herein constitute the complete agreement and exclusive statement of the terms and conditions between the parties, which supercedes and merges all prior proposals, understandings and all other agreements, verbal and written, between the parties relating to the subject matter of this agreement. This agreement may not be modified or altered except by written instrument duly executed by both parties.
[SIGNATURE PAGE TO FOLLOW]
7.j.2
Packet Pg. 238 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-0 City Project No. C9823
SIGNATURE PAGE
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date first above written by their respective officers duly authorized in that behalf.
CITY OF SAN CARLOS:
Dated:
Jeff Maltbie, City
Manager ATTEST:
Dated:
Crystal Mui, City Clerk
APPROVED AS TO
FORM:
Dated:
Gregory J. Rubens, City Attorney
CONSULTANT/CONTRACTOR/VENDOR:
I acknowledge that I have full authority to execute this agreement on behalf of the Consultant/Contractor/Vendor, and have read, understand, and agree to comply with the provisions of this Agreement, including the Insurance and indemnity requirements set forth herein.
Dated:
7.j.2
Packet Pg. 239 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-1 City Project No. C9823
EXHIBIT A
CONTRACTOR’S BID PROPOSAL
[To be attached]
7.j.2
Packet Pg. 240 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-2 City Project No. C9823
EXHIBIT B
This INSURANCE COVERAGE FORM modifies or documents insurance provided under the following:
Named Insured: Effective Work Date(s):
Description of Work/Locations/Vehicles:
ADDITIONAL INSURED: City of San Carlos
600 Elm Street, San Carlos, CA 94070
Attention: _________________________________
Contract Administrator
Endorsement and Certificates of Insurance Required
The Additional Insured, its elected or appointed officers, officials, employees and volunteers are included as insureds with regard to damages and defense of claims arising from: (Check all that apply) Insurer Policy No.
General Liability: (a) activities performed by or on behalf of the Named Insured, (b) products and completed operations of the Named Insured, (c) premises owned, leased occupied or used by the Named Insured, and/or (d) permits issued for operations performed by the Named Insured. {Note:
MEETS OR EXCEEDS ISO Form # CG 20 10 11 85}
Auto Liability: the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Named Insured, regardless of whether liability is attributable to the Named Insured or a combination of the Named Insured and the Additional Insured, its elected or appointed officers, officials, employees or volunteers.
Other:
Certificates of Insurance Required (no endorsement needed) (Check all that apply)
Insurer Policy No.
Workers Compensation: work performed by employees of the Named Insured while those employees are engaged in work under the simultaneous directions and control of the Named Insured and the Additional Insured.
Professional Liability:
PRIMARY/NON-CONTRIBUTORY: This insurance is primary and is not additional to or contributing with any other insurance carried by or for the benefit of Additional Insureds.
SEVERABILITY OF INTEREST: The insurance afforded by this policy applies separately to each insured who is seeking coverage or against whom a claim is made or a suit is brought, except with respect to the insurer’s limit of liability.
PROVISIONS REGARDING THE INSURED'S DUTIES AFTER ACCIDENT OR LOSS: Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the Additional Insured, its elected or appointed officers, officials, employees, or volunteers.
CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days' prior written notice (ten (10) days if canceled due to non-payment) by regular mail return receipt requested has been given to the Additional Insured. Such notice shall be addressed as shown above.
WAIVER OF SUBROGATION: The insurer(s) named above agree to waive all rights of subrogation against the CITY/Public Works Departmentt, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the CITY/Public Works Department.
Nothing herein contained shall vary, alter or extend any provision or condition of the Policy other than as above stated.
SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE INSURER I, _______________________________________________________________(print/type name), warrant that I have authority to bind the above-named insurance company and by my signature hereon do so bind this company. ________________________________________________________________ _____________________ SIGNATURE OF AUTHORIZED REPRESENTATIVE (original signature required) DATE ISSUED ORGANIZATION:_________________________________________ TITLE:______________________________ ADDRESS: _____________________________________________ TELEPHONE: ( ) _______
7.j.2
Packet Pg. 241 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-3 City Project No. C9823
RESOLUTION OF CONSTRUCTION CLAIMS
Any public works claims arising under this contract which the Contractor wishes to assert against the Governing Agency shall be governed by California Public Contract Code Section 9204. Claims which do not exceed three hundred seventy-five thousand dollars ($375,000) are also subject to the provisions of Article 1.5 of the California Public Contract Code (commencing with Section 20104). Pursuant to California Public Contracts Code Section 9204, claims shall be resolved as follows:
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
7.j.2
Packet Pg. 242 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-4 City Project No. C9823
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.
Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
7.j.2
Packet Pg. 243 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-5 City Project No. C9823
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS, that
WHEREAS, The City of San Carlos (hereinafter referred to as “Owner”) and (hereinafter referred to as “Principal”) have entered into a contract for the construction of Fire Station No. 16 Replacement Project, City Project No. C9823 and WHEREAS, under the terms of said contract Principal is required to furnish a bond securing payment of the claims to which reference is made in Section 3248 of the Civil Code; NOW, THEREFORE, we, the Principal, and
, as Surety, are held and firmly bound unto the “Owner” in the penal sum of /l00 Dollars ($ )
lawful money of the United States, being not less than one hundred percent (100%) of the amount payable by the terms of the contract, for the payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
The condition of this obligation is such that if said Principal or any of its subcontractors fails to pay any of the persons named in Section 3181 of the Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board from the wages of employees of the Principal or its subcontractors pursuant to Section 18806 of the Revenue and Taxation Code, with respect to such work and labor that the Surety will pay for the same, in an amount not exceeding the amount hereinabove set forth and also will pay, in case suit is brought upon this bond, a reasonable attorney’s fee, to be fixed by the court. We hereby state and confirm that we are a “California admitted insurer” as defined by the California Department of Insurance.
This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
This bond is given to comply with Sections 3247 and 3248 of the Civil Code. The liability of the Principal and Surety hereunder is governed by the provisions of said Code, all acts amendatory thereof, and all other statutes referred to therein, including Section 3225 of the Civil Code.
The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed there under or the specifications accompanying the same shall in any ways affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this _________ day of __________________, 20 , the name and corporate seal of each corporate body being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.
7.j.2
Packet Pg. 244 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-6 City Project No. C9823
(Principal)
NOTE: By
To be signed by By
Principal and Surety
and acknowledgment
and nortarial seal
(Surety)
By
By
7.j.2
Packet Pg. 245 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-7 City Project No. C9823
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS, that
WHEREAS, The City of San Carlos (hereinafter referred to as “Owner”) has entered into a contract with _ ___________________ (hereinafter referred to as “Principal”) for the construction of Fire Station No 16 Replacement Project, City Project No. C9823, and WHEREAS, said Principal is required under the terms of said contract to furnish a bond of faithful performance of said Contract;
NOW, THEREFORE, we, the Principal, and
, as Surety, are held and firmly bound unto the
“Owner” in the penal sum of _____________________________/100 Dollars($ ) lawful money of the United States, being a sum equal to the total amount payable under the contract, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounded Principal shall in all things stand to and abide by and well and truly keep and perform the covenants, conditions and agreements in the said contract and any alteration thereof made as therein provided, on the Contractor’s part to be kept and performed at the time and in the manner therein specified, and in all respects according to the Contractor’s true intent and meaning, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.
As a condition precedent to satisfactory completion of the said contract, the above obligations to the amount of and-00/100 Dollars ($ ) being not less than ten percent (10%) of the total amount payable under the contract, shall hold good for a period of two (2) years after the completion and acceptance of said work, during which time if the above Principal shall fail to make full, complete and satisfactory repair and replacement or totally protect the “Owner” from loss or damage made evident during said period of two (2) years from the date of acceptance of said work, and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, the above obligations in the said sum of and-00/100 Dollars ($ ) shall remain in full force and virtue; otherwise the above obligation shall be void.
And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed there under of the Specifications accompanying the same shall in any ways affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the Specifications. We hereby state and confirm that we are a “California admitted insurer” as defined by the California Department of Insurance.
In the event that the “Owner” or its successors or assigns, shall be the prevailing party in an action brought upon this bond, then, in addition to the penal sum hereinabove specified, we
7.j.2
Packet Pg. 246 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-8 City Project No. C9823
agree to pay to the “Owner” for its successors or assigns, a reasonable sum on account of attorney’s fees in such action, which sum shall be fixed by the court.
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this _________ day of __________________, 20 , the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to the authority of its governing body.
(Principal)
NOTE: By
To be signed by By
Principal and Surety
and acknowledgment
and nortarial seal
(Surety)
By
By
7.j.2
Packet Pg. 247 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-9 City Project No. C9823
WORKERS' COMPENSATION CERTIFICATION
Labor Code Section 1861
The Bidder hereby certifies as follows:
"I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions and furnish proof of said insurance before commencing the performance of the work of this contract."
Name of Contractor
Signature of Contractor Representative
Dated: __________________________
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.
7.j.2
Packet Pg. 248 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-10 City Project No. C9823
CERTIFICATION OF SAFETY REQUIREMENTS FOR
CONTRACTORS AND VENDORS
California Code of Regulations, Title 8, Section 1509
To work as a contractor or vendor with the City of San Carlos, your organization is required to certify that it has an active on-the-job written Injury and Illness Prevention Program. This program is essential to make the job as accident-free as possible and to comply with Federal and State Safety Standards.
The undersigned hereby certifies that the Contractor’s organization has an active written Injury and Illness Prevention Program, as required by Cal-OSHA under California Code of Regulations, Title 8, General Industry Safety Orders, Section 3203 and/or Construction Safety Orders, Section 1509, that ensures compliance with, and enforcement of, current minimum CalOSHA Safety Standards, and that the Contractor’s organization has knowledge of these standards that are applicable to the job operations. This includes a program for ensuring employees have been trained to recognize hazards of their job.
The undersigned also hereby certifies that the Contractor’s organization has an active written Hazard Communication Program with evidence that all employees have been trained in safe use and handling of chemicals on the job site, and a file will be made available for review by the City of San Carlos of each Material Safety Data Sheet (MSDS) on those chemicals kept on the site.
Name of Contractor
Signature of Contractor Representative
Dated: __________________________
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.
7.j.2
Packet Pg. 249 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-11 City Project No. C9823
DRUG-FREE WORKPLACE CERTIFICATION
The bidder_________________________________________________________________, hereby certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. The contractor will:
1. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as required by Government Code Section 8355(a).
2. Establish a Drug-Free Awareness Program as required by Government Code Section 8355(b), to inform employees about all of the following:
(a) The dangers of drug abuse in the workplace,
(b) The person’s or organization’s policy of maintaining a drug-free workplace, (c) Any available counseling, rehabilitation and employee assistance programs, and (d) Penalties that may be imposed upon employees for drug abuse violations.
3. Provide as required by Government Code Section 8355(c), that every employee who works on the proposed contract or loan:
(a) Will receive a copy of the company’s drug-free policy statement, and (b) Will agree to abide by the terms of the company’s statement as a condition of employment on the contract or loan.
I, the official named below, hereby swear that I am duly authorized legally to bind the contractor to the above described certification. I am fully aware that this certification, executed on the date below, is made under penalty of perjury under the laws of the State of California.
Dated:_______________________, 20____.
________________________________
Contractor’s Signature
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.
7.j.2
Packet Pg. 250 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-12 City Project No. C9823
ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION (Optional) Public Contract Code Section 22300
This Escrow Agreement is made and entered into by and between _______________________________ whose address is __________________________________________________ hereinafter called "Owner,"________________________________ whose address is ______________________________
____________________hereinafter called "Contractor" and ____________________________________ whose address is __________________________________________ hereinafter called "Escrow Agent." For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for __________________ in the amount of _______________ dated __________ (hereinafter referred to as the "Contract"). Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of ____________________, and shall designate the Contractor as the beneficial owner. (2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld
from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above.
(3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated.
The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly.
(4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent.
(5) The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. (6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor. (7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven (7) days written notice to the Escrow Agent from the owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner.
7.j.2
Packet Pg. 251 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-13 City Project No. C9823
(8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account.
The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.
(9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5) to (8), inclusive, of this agreement and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent's release and disbursement of the securities and interest as set forth above. (10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:
On behalf of Owner: On behalf of Contractor: On behalf of Escrow Agent:
___________________________ ___________________________ _______________________________ Title Title Title
___________________________ ___________________________ _______________________________ Name Name Name
___________________________ ___________________________ _______________________________ Signature Signature Signature
___________________________ ___________________________ _______________________________ Address Address Address
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.
Owner: Contractor:
______________________________ ___________________________________ Title Title
______________________________ ___________________________________ Name Name
______________________________ ___________________________________ Signature Signature
7.j.2
Packet Pg. 252 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Agreement Fire Station No. 16 Replacement Project
Page A-14 City Project No. C9823
GUARANTEE
(To Be Submitted Prior to Project Acceptance)
FOR THE
City of San Carlos
San Carlos, CA 94070
Fire Station No. 16 Replacement Project
City Project No. C9823
We hereby guarantee that the work we have installed for the above named project has been done in accordance with the Plans and Specifications and that the work installed will fulfill the requirements of the guarantee.
We agree to repair or replace any or all of our work, together with any other adjacent work which may be displayed in so doing that may prove to be defective in its workmanship or material within a period of two (2) years from the date of acceptance of the above-named work by the City of San Carlos, without any expense whatsoever to the City of San Carlos, ordinary wear and tear and unusual abuse or neglect excepted.
Within fifteen (15) days after being notified in writing by the City of San Carlos of any defects in the work, we agree to commence and prosecute with due diligence all work necessary to fulfill the terms of this guarantee, and to complete the work within a reasonable period of time, and in the event of our failure to so comply, we collectively and separately, do hereby authorize said City of San Carlos to proceed to have such work done at our expense and we will honor and pay the cost and changes therefore upon demand.
Dated:
By:
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO PROJECT ACCEPTANCE.
7.j.2
Packet Pg. 253 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs)
GENERAL PROVISIONS
7.j.2
Packet Pg. 254 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) This Page Intentionally Left Blank
7.j.2
Packet Pg. 255 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs)
TABLE OF CONTENTS
SECTION 1 – TERMS AND DEFINITIONS
1.01 Terms ................................................................................................................................ 1
1.02 Definitions .......................................................................................................................... 1 SECTION 2 – PROPOSAL REQUIREMENTS AND CONDITIONS
2.01 General .............................................................................................................................. 6
2.02 Proposal Forms ................................................................................................................. 6
2.03 Qualifications of Bidders .................................................................................................... 6
2.04 Rejection of Proposals Containing Alterations, Erasures, or Irregularities ........................ 6
2.05 Submission of Bids ............................................................................................................ 6
2.06 Approximate Estimate ....................................................................................................... 7
2.07 Examination of Plans, Specifications and Work Site ......................................................... 7
2.08 Withdrawal of Proposals .................................................................................................... 7
2.09 Proposal Guarantee .......................................................................................................... 7
2.10 Disqualification of Bidders ................................................................................................. 7
2.11 Bid Protest Procedures ..................................................................................................... 7
2.12 List of Subcontractors ........................................................................................................ 8
2.13 Required Contractor and Subcontractor Registration ....................................................... 8 SECTION 3 – REVIEW OF BIDS, CONTRACT AWARD AND EXECUTION
3.01 Public Bid Opening and Initial Review ............................................................................... 9
3.02 Determination of Lowest Responsible Bidder ................................................................... 9
3.03 Notice of Award ................................................................................................................. 10
3.04 Contract Execution ............................................................................................................ 10
3.05 Status of Contractor .......................................................................................................... 10
3.06 Assignment ........................................................................................................................ 10
3.07 Recognition of Subcontractors .......................................................................................... 10
3.08 Return of Bid Security ....................................................................................................... 10
3.09 Forfeiture of Proposal Guarantee ...................................................................................... 11
3.10 Contract Bonds .................................................................................................................. 11
3.11 Notification of Surety Companies ...................................................................................... 12
3.12 Power of Attorney .............................................................................................................. 12
3.13 Insurance Requirements ................................................................................................... 12
3.14 Special Requirements ....................................................................................................... 12
3.15 Builders Risk Insurance ..................................................................................................... 13
3.16 Certificates ........................................................................................................................ 13
3.17 Legal Address of Contractor .............................................................................................. 13
3.18 Office of Contractor at Site ................................................................................................ 13 SECTION 4 – SCOPE AND CONTROL OF THE WORK
4.01 Work to be Done ............................................................................................................... 14
4.02 Plans and Specifications ................................................................................................... 14
4.03 Reference to Standards and Codes .................................................................................. 14
4.04 Authority of the Engineer ................................................................................................... 15
4.05 Contract Documents and Precedence .............................................................................. 15
4.06 Interpretation of Specifications and Drawings ................................................................... 15
4.07 Figured Dimensions .......................................................................................................... 15
4.08 Errors or Discrepancies ..................................................................................................... 16
4.09 Drawings to be Furnished by Contractor ........................................................................... 16
4.10 Additional Drawings by City ............................................................................................... 16
4.11 Lines and Grades .............................................................................................................. 16
4.12 Record Documents ............................................................................................................ 16
4.13 Record Drawings ............................................................................................................... 16
4.14 Reuse of Documents ......................................................................................................... 17
4.15 Subsurface Data ................................................................................................................ 17
4.16 Right-of-Way ..................................................................................................................... 17
4.17 Removal of Defective and Unauthorized Work ................................................................. 17
4.18 Acceptance of Defective Work .......................................................................................... 17
7.j.2
Packet Pg. 256 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs)
4.19 Submittals .......................................................................................................................... 17
4.20 Substitutions ...................................................................................................................... 18
4.21 Construction Staking Lines and Grades ............................................................................ 19
4.12 Inspection of the Work ....................................................................................................... 19
4.23 Testing ............................................................................................................................... 19 SECTION 5 – CHANGES IN WORK
5.01 Limited City Authority to Approve Change Orders ............................................................ 21
5.02 Contractor Liability for Unapproved Change Orders ......................................................... 21
5.03 Non-Material Change Requests by the Contractor ........................................................... 21
5.04 Effect of Extension of Time ............................................................................................... 21
5.05 Letters of Instruction .......................................................................................................... 21
5.06 Requests for Information, Inconsistencies and Changed Conditions ................................ 21
5.07 Extra and Omitted Work .................................................................................................... 22
5.08 Change Orders .................................................................................................................. 22
5.09 Disputed Work ................................................................................................................... 26 SECTION 6 – CONTROL OF MATERIALS
6.01 Materials and Workmanship .............................................................................................. 27
6.02 Protection of Work and Materials ...................................................................................... 27
6.03 Trade Names or Equals .................................................................................................... 27
6.04 Inspection of Materials by City .......................................................................................... 28
6.05 Inspection of Materials by Others ...................................................................................... 28
6.06 Tests of Materials .............................................................................................................. 28
6.07 Certification ....................................................................................................................... 28
6.08 Weighing and Metering Equipment ................................................................................... 28
6.09 Calibration of Testing Equipment ...................................................................................... 29 SECTION 7 – UTILITIES
7.01 City’s Statutory Obligation ................................................................................................. 30
7.02 Contractor’s Obligation to Identify and Protect Subsurface Infrastructure ........................ 30
7.03 Location ............................................................................................................................. 30
7.04 Protection .......................................................................................................................... 31
7.05 Shut Down Notification ...................................................................................................... 31
7.06 Removal ............................................................................................................................ 31
7.07 Relocation ......................................................................................................................... 31
7.08 Delays ............................................................................................................................... 32
7.09 Cooperation ....................................................................................................................... 32 SECTION 8 – PROSECUTION AND PROGRESS
8.01 Notice to Proceed .............................................................................................................. 33
8.02 Commencement of Work ................................................................................................... 33
8.03 Subcontracting .................................................................................................................. 33
8.04 Administrative Duties ......................................................................................................... 33
8.05 Baseline Construction Schedule ....................................................................................... 33
8.06 Three-Week Look Ahead Schedule .................................................................................. 33
8.07 Construction Sequence ..................................................................................................... 34
8.08 Recording Existing Conditions .......................................................................................... 34
8.09 Preconstruction Conference .............................................................................................. 34
8.10 Progress Meeting .............................................................................................................. 34
8.11 Hours of Construction ........................................................................................................ 34
8.12 Prosecution of Work .......................................................................................................... 34
8.13 Suspension of Work .......................................................................................................... 35
8.14 Default by the Contractor and Termination of Control ....................................................... 35
8.15 Contractor’s Right to Stop Work or Terminate Contract .................................................... 36
8.16 City’s Right to Terminate Contract .................................................................................... 36
8.17 Time of Completion and Days Charged ............................................................................ 37
8.18 Liquidated Damages ......................................................................................................... 37
8.19 Delays and Extension of Time ........................................................................................... 38
8.20 Substantial Completion ..................................................................................................... 40
8.21 Project Closeout ................................................................................................................ 40
7.j.2
Packet Pg. 257 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs)
8.22 Final Completion ............................................................................................................... 40
8.23 Final Acceptance ............................................................................................................... 41
8.24 Risk of Loss ....................................................................................................................... 41
8.25 Use of Improvements During Construction ...................................................................... 41 SECTION 9 – RESPONSIBILITIES OF THE CONTRACTOR
9.01 Contractor’s Responsibility for the Work ........................................................................... 42
9.02 Contractor’s Responsibility for Subcontracted Work ......................................................... 42
9.03 Superintendent .................................................................................................................. 42
9.04 Character of Workers ........................................................................................................ 42
9.05 Laws to be Observed ........................................................................................................ 42
9.06 Permits and Fees .............................................................................................................. 44
9.07 Coordination and Cooperation .......................................................................................... 44
9.08 Use of Premises ................................................................................................................ 45
9.09 Construction Staging and Field Office ............................................................................... 45
9.10 Site Security ...................................................................................................................... 46
9.11 Construction Water ............................................................................................................ 46
9.12 Project Site Maintenance .................................................................................................. 46
9.13 Preservation of Property .................................................................................................... 48
9.14 Protection of Buried Utilities .............................................................................................. 49
9.15 Protection of Bridges ......................................................................................................... 49
9.16 Protection of Traffic Signal Facilities ................................................................................. 49
9.17 Restoration of Adjacent and Existing Improvements ......................................................... 50
9.18 Archeological Remains ...................................................................................................... 50
9.19 Access to Private Property ................................................................................................ 50
9.20 Traffic Control and Public Convenience ............................................................................ 50
9.21 Safety ................................................................................................................................ 53
9.22 Patent Fees or Royalties ................................................................................................... 55
9.23 Advertising ......................................................................................................................... 55
9.24 Antitrust Claims ................................................................................................................. 55
9.25 Audit and Examination of Records .................................................................................... 55
9.26 Notice of Entrance ............................................................................................................. 56
9.27 Additional and Emergency Protection ............................................................................... 56
9.28 Placing Portions of Work in Service .................................................................................. 56
9.29 Rights of Way .................................................................................................................... 56 SECTION 10 – MEASUREMENT AND PAYMENT
10.01 Free on Board (F.O.B.) ...................................................................................................... 58
10.02 Schedule of Values ........................................................................................................... 58
10.03 Payment Submittal ............................................................................................................ 58
10.04 Adjustments for Unilateral Change Orders ........................................................................ 59
10.05 Final Payment ................................................................................................................... 59
10.06 Non-Allowable Direct Changes ......................................................................................... 61
10.07 Retention ........................................................................................................................... 61
10.08 Securities in Lieu of Retention ........................................................................................... 61
10.09 Aditional Withholdings ....................................................................................................... 62
10.10 Acceptance ........................................................................................................................ 62
10.11 Compensation for Extra or Omitted Work ......................................................................... 62
10.12 Compensation to City for Extension of Time ..................................................................... 62
10.13 Claims ............................................................................................................................... 63
10.14 Time Limit on Claims ......................................................................................................... 63
10.15 City Response to Claims ................................................................................................... 63
10.16 Appeal of Engineer’s Decision .......................................................................................... 63 SECTION 11 – GUARANTEE
11.01 Contractor’s Guarantee ..................................................................................................... 65
11.02 Correction of Defective Work During the Guarantee Period ............................................. 65 * * *
7.j.2
Packet Pg. 258 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-1 Project No. C1737-22
GENERAL PROVISIONS
SECTION 1 – TERMS AND DEFINITIONS
1.01 Terms – Unless otherwise stated, the words “directed, required, permitted, ordered, instructed, designated, considered necessary, prescribed, approved, acceptable, satisfactory,” or words of like meaning, refer to actions, expressions, and prerogatives of the Engineer.
1.02 Definitions – Except as amended or supplemented, whenever in the Contract Documents the following terms are used, the intent and meaning shall be interpreted as follows:
Agreement - The written contract documents between the City and the Contractor covering the performance of the work.
As Shown, As Indicated, As Detailed - Where these words or words of similar import, are used, it shall be understood that reference to the drawings accompanying these specifications is made unless stated otherwise. Where "As Directed", "As Permitted", "Approved", or words of similar import, are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the Engineer is intended unless stated otherwise. As used herein, "Provide" shall be understood to mean "Provide Complete in Place" that is, "Furnish and Install”, and "Install" shall mean the installation complete in place of an item of equipment furnished by the City.
ASTM - American Society for Testing and Materials specifications.
AWWA - American Water Works Association and its Standard Specifications.
Addenda - Written or graphic instruments issued prior to the opening of bids which clarify, correct or change the bidding documents or the Contract Documents.
Bid - The offer or proposal of the bidder submitted on the prescribed forms setting forth the prices for the work to be performed.
Bid Forms - Includes the Bid Schedule, Designation of Subcontractors, Bidders Statement of Responsibility, Bidder’s Non-Collusion Affidavit, Bid Security, and all other information requested by the Bid Proposal Documents.
Bidder – Any individual, firm, partnership, corporation, or combination thereof submitting a bid for the work, acting directly or through a duly authorized representative. After the City awards the Contract, the term “Bidder” shall be equivalent to the term “Contractor” for the purpose of identifying the Contractor’s rights and obligations under the Contract Documents.
Bidding Documents - The Notice Inviting Sealed Proposals, Instruction to Bidders, Bid Proposal forms and Bidders Bond.
Bonds - Bid, performance, labor and material, and warranty bonds and other instruments of security.
Change Orders – A written order by the Engineer to the contractor making changes in the plans or specifications which is signed by the Contractor and City authorizing an addition, deletion or revision in the work, with possible adjustment in the contract price or the contract time, issued on or after the effective date of the Agreement. If the change involves items for which there is no contract unit price, the order shall so state and stipulate that the changes shall be performed as extra work or work omitted.
7.j.2
Packet Pg. 259 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-2 Project No. C1737-22
City - The City of San Carlos acting through the City Council or any other board, body, official(s) to which or to whom the power belonging to the City Council has been properly delegated.
City Regulations - All written laws, rules, and policies established by the City, including those set forth in the General Plan, San Carlos Municipal Code, ordinances, resolutions, policies, procedures, and City design documents (including the Standard Specifications, design standards, and relevant Public Facility Master Plans).
Code – The terms Government Code, Labor Code, etc., refer to codes of the State of California.
Contract – See definition for “Agreement”.
Contract Documents - See Agreement, Section 2.1, “List of Contract Documents and Precedence”.
Contract Drawings or Plans - All drawings which may have been prepared by or in behalf of the City, as a basis for proposals, when duly signed and made a part of this contract by incorporation or reference, all drawings submitted in pursuance of the terms of this contract by the successful bidder with their proposal and by the contractor to the City and reviewed by the Engineer; and all drawings submitted by the Engineer to the contractor during the progress of the work as provided for herein.
Contract Price - The total amount of money for which contract is awarded and as amended.
Contract Time - The number of days or the date stated in the contract as the duration for completing work.
Contract Unit Price - The Contractor’s original bid for a single unit of an item of work in the proposal.
Contractor - An individual, partnership, corporation, developer, joint venture, subdivider or other legal entity entering into a contract or agreement with the City to perform the work covered by this contract, and their authorized agents or legal representatives. After the City awards the Contract, the term “Contractor” shall be equivalent to the term “Bidder” for the purpose of identifying the Contractor’s rights and obligations under the Contract Documents.
Day or Days - Unless herein otherwise expressly defined, shall mean a calendar day of twentyfour hours each.
Defective Work - Work that is unsatisfactory, faulty, omitted, incomplete, deficient, or does not conform to the requirements of the Contract Documents, directives of the Engineer, or requirements of any inspection, reference standard, test, or approval specified in the Contract Documents, or has been damaged prior to the Engineer’s recommendation of final acceptance. See General Provisions Section
6.01, “Materials and Workmanship”.
Directive – Any document, signed by the City, with instruction to the Contractor pertaining to the completion of a project objective; including, but not limited to responses to requests for information, clarifications, letters of instruction, the notice of award and the notice to proceed.
Engineer - The Representative duly and officially appointed by the City to represent the City and to observe the work of construction under this contract, acting personally or through agents or assistants duly authorized by the Representative, such agents or assistants acting within the scope of the particular duties entrusted to them.
Extra Work - Performance or furnishing of work or material found necessary for the proper completion of the improvements, the payment of which is not covered by any item of the bid schedule and for which no means of payment, direct or indirect, has been provided in the contract.
7.j.2
Packet Pg. 260 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-3 Project No. C1737-22
Final Completion - The point at which work has been completed in accordance with the contract documents, plans and specifications to the satisfaction of the Engineer and there are no items of work remaining to be completed. See General Provisions, Section 8.22, “Final Completion”.
Force Account Work – Force account work is a method of compensation utilized to pay for extra work typically needed to overcome unanticipated work, resulting from the project work scope, necessary to complete the project work scope that cannot be well defined prior to the start of extra work. General Provision, Section 5.08 “Change Orders“ establishes the specific methods of compensation for labor, materials and equipment used to perform the force account work.
Greenbook - The Standard Specifications and Plans written and promulgated by Public Works Standards, Inc., entitled “Standard Specifications for Public Works Construction”, and “Standard Plans for Public Works Construction”, current editions.
Hold Harmless - Agreement by one party to bring no claim for negligence, breach of contract, indemnity or otherwise against another party. See Agreement Section 17, “Indemnification”.
Inspector - The engineering or technical inspector(s) duly authorized or appointed by the Engineer or City, limited to the particular duties entrusted to them.
Liquidated Damages - The amount of dollars assessed for each and every calendar day required to complete the contract in excess of the contract time. See General Provisions, Section 8.18, “Liquidated Damages”.
Losses - Any and all losses, costs, liabilities, claims, damages, and expenses, including, without limitation, reasonable attorneys’ fees and expenses.
Manual of Uniform Traffic Control Devices (MUTCD) or California Manual of Uniform Traffic Control Devices (CAMUTCD) – The latest edition of the California Manual of Uniform Traffic Control Devices.
Modification – Modifications to the Agreement are executed by change orders, and may only be issued after the effective date of the contract.
Notice - Any notice allowed or required to be given by the City may be given by the Engineer.
Notice of Award – The written notice by the City to the successful Bidder stating that upon completion of required conditions the City will execute the contract.
Notice to Proceed – A written notice by the City to the Contractor authorizing the Contractor to proceed with the work and fixing the date on which the contract time will start.
Plans - The contract plans and/or supplemental drawings approved by the Engineer which show the location, character, dimensions and details of the work.
Project - The total construction of which the work performed under the Contract Documents may be the whole or a part and which may include construction by the City or by separate Contractors.
Proposal - The offer of a bidder when submitted on the proposal form, properly signed and guaranteed.
Reference Specifications - Those standards, rules, method of tests or analysis, codes, and specifications of other agencies, engineering societies, or industrial associations referred to in the Contract Documents. These refer to the current edition or amendments in effect at the time of advertising the project unless specifically referred to by edition, volume or date. Unless otherwise stated in the plans or specifications, the reference specification in effect shall be that edition which was in effect on the date of the Notice Inviting Bids.
7.j.2
Packet Pg. 261 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-4 Project No. C1737-22
Shop Drawings - All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for the Contractor to illustrate some portion of the work and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams and other information prepared by a supplier and submitted by the Contractor to illustrate material or equipment for some portion of the work. See General Provisions, Section 4.19, “Submittals”.
Special Provisions - Any provisions which supplement or modify these standard specifications.
Specifications – The information, directions, provisions and requirements pertaining to the work, and contained herein including Special Provisions, Technical Specification, General Provisions, those administrative subsections of Caltrans’ Standard Specification that are specifically referenced in this Contract and the non-administrative sections (Section 10 through 95) of the Caltrans’ Standard Specification dated 2010.
Standard Plans - The Standard Details of the City of San Carlos, current edition, including the Parks and Streetscape Standard Plans, current edition, identifying construction standards for the various items of work indicated and/or referred to on the plans, specifications or special provisions.
Standard Specifications - The Standard Specifications of the City of San Carlos.
Standard Specifications for Public Works Construction - The Standard Specifications for Public Works Construction, “Greenbook”, current edition.
State - State of California.
State Standard Plans - The Standard Plans of the Department of Transportation of the State of California, (Caltrans’) Standard Plans dated 2010.
State Standard Specifications - The Standard Specifications of the Department of Transportation of the State of California Caltrans’ Standard Specification dated 2010.
Subcontractor - Any individual, firm or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the work at the site. Unless otherwise specifically provided, the term Subcontractor includes Subcontractor of any tier, suppliers, manufacturers and distributors. See Section 3.07 of the General Provisions.
Substantial Completion – When the work (or a specified part thereof) has progressed to the point where it is sufficiently complete and in accordance with the Contract Documents. See General Provisions, Section 8.20, “Substantial Completion”.
Superintendent – The executive representative of the contractor responsible for the site supervision of the work at all times during progress, authorized to receive and fulfill instructions from the Engineer and to accept orders for changed and extra work.
Surety - Any individual, firm or corporation, bound with and for the Contractor for the acceptable performance and completion of the work, and the satisfaction of all obligations incurred.
Surveyor - A land surveyor licensed in the State of California.
Unbalanced Bid - See Materially Unbalanced Bid and Mathematically Unbalanced Bid.
Work - The construction and services required by the Contract Documents as amended by contract modifications, whether completed or partially completed, including all labor, materials, equipment, tools, and services provided or to be provided, by the Contractor to fulfill the Contractor’s obligations. The work may constitute the whole or a part of the project
7.j.2
Packet Pg. 262 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-5 Project No. C1737-22
Working Day – Any day except Saturday, Sunday, Holidays observed by the City, or days in which the Contractor is entitled to an excusable delay. Holidays observed by the City are: Thanksgiving, day after Thanksgiving, Christmas Day, New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, and Veteran’s Day. See General Provisions, Section 8.19, “Delays and Extension of Time”. In addition, at the option of the Engineer, the contractor may be required to suspend all work and activities during the City’s annual Holiday Closure in late December and early January of each year. No work shall be done during this suspension except such work as is necessary for the proper care and protection of work already performed, or except in case of an emergency, and in any case, only with prior written permission of the Engineer. This suspension of work will be at no cost to the City. Working days will not be assessed during this suspension of work.
7.j.2
Packet Pg. 263 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-6 Project No. C1737-22
SECTION 2 – PROPOSAL REQUIREMENTS AND CONDITIONS
2.01 General - Bidders may obtain complete sets of the Contract Documents, including the proposal forms to be used for bidding, at the location designated in the Notice to Bidders. Bidders shall use complete sets of Contract Documents in the preparation of bids. The City makes copies of the Contract Documents available, on the above terms, for the sole purpose of obtaining Bids for the work and does not confer a license or grant permission for any other use of the Contract Documents.
2.02 Proposal Forms – The portion of the Contract Documents entitled “Bid Proposal” focuses the Bidders attention on the requirements for submitting a proposal, including the Notice to Bidders, and the Bid Proposal Forms.
Bids are required for the entire work described herein and shall be submitted on the blank forms prepared by the City and provided herein. The Bid Proposal submitted to the City shall consist of the completed Bid Schedule, Designation of Subcontractors, Bidders Statement of Responsibility, Bidder’s Non-Collusion Affidavit, Bidder’s Qualifications, Bidders References, Signature of Bidder, Bid Guaranty, and all other information requested by the Bid Proposal documents.
All proposals shall type or print legibly in ink the proposed prices both in writing and in figures and shall be signed, with address included, by the bidder or the bidder's authorized representative.
Corrections must all be individually initialed by the Bidder. Bidder shall not modify or qualify the Bid Forms in any manner.
The Bid Forms shall be signed by a person or persons legally authorized to bind the Bidder to the Contract. The individuals signing each document shall warrant that they are authorized to bind the legal entity of the Bidder. Proposals made by individuals must show the individual's signature and post office address; if made by a firm or partnership and the signature of one or all of the partners must be shown. Proposals submitted by corporations must show the name and post office address of the corporation, the name of the state, under whose laws the corporation is chartered, and the signature and title of the person signing on behalf of the corporation.
2.03 Qualifications of Bidders - Each bidder shall be licensed as specified in the Notice to Bidders and in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code, State of California, and shall be skilled and regularly engaged in the general class or type of work called for under this contract.
It is the intention of the City to award a contract only to a bidder who is able to furnish satisfactory evidence that they have the requisite experience and ability and that the bidder has sufficient capital, facilities and plant to enable them to prosecute the work successfully and promptly, and to complete it within the time set forth in the contract.
In determining the degree of responsibility to be credited to a bidder, the City will weigh any evidence indicating the bidder, or personnel guaranteed to be employed in responsible charge of the work, has satisfactorily performed other contracts of like nature and magnitude.
2.04 Rejection of Proposals Containing Alterations, Erasures, or Irregularities - Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete bids, irregularities of any kind, or corrections and erasures without initials by the Bidder.
2.05 Submission of Bids - All Bid Forms, including all documents required to be submitted with the Bid, shall be enclosed in a sealed opaque envelope. The envelope shall be clearly marked on its face with the Bidder’s name and address, and the notation “SEALED BID ENCLOSED, CITY OF SAN CARLOS”, with an identification of the project name and number as identified in the Notice to Bidders. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope. Oral, telephonic, facsimile, telegraphic, or electronically transmitted Bids are invalid and will not be accepted.
7.j.2
Packet Pg. 264 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-7 Project No. C1737-22
Bids may be mailed or delivered by messenger. It is the Bidder’s responsibility alone to ensure that the Bid is received prior to the bid opening deadline at the place specified in the Notice to Bidders.
Whether or not bids are opened exactly at the time fixed in the public notice inviting bids, any bid received after that time shall be returned unopened.
2.06 Approximate Estimate - The quantities listed in the bid schedule are approximate only, supplied as a general indication of the scope of work and to be used as a basis for comparing bids. The City does not expressly or by implication agree that the actual amount of work will correspond therewith, and reserves the right to increase or decrease the amount of any class or portion of the work, or to delete any portions of the work in their entirety, from the quantities listed on the bid schedule, as may be deemed necessary or advisable by the Engineer.
2.07 Examination of Plans, Specifications and Work Site - Bidder shall examine carefully the plans, specifications, proposal and contract forms, and the physical site of the work contemplated, regardless of if a site walk or pre-bid meeting has been scheduled by the City or not. It will be assumed that the bidder has investigated and is aware of the conditions to be encountered in carrying out the proposed work, and is fully satisfied as to the scope, character, quality, quantity and requirements of the proposed work, and the submission of a bid will be an acknowledgement of that assumption.
The bidder shall receive no additional compensation for obstacles or difficulties due to surface or subsurface conditions actually encountered. Where investigations of surface or subsurface conditions have been made by the City in respect to foundation or other structural design, and that information is shown in the plans, said information is included only for the convenience of bidders. The City assumes no responsibility whatsoever as to the sufficiency or accuracy of borings, or of the log of test borings or other investigations or tests, or of the interpretation thereof; there is no guaranty, warranty or representation, express or implied, that the conditions indicated thereby in fact exist or are representative of those existing throughout the work. Such information shall be used as a basis for bids at the bidder's own and sole risk; making such information available to bidders is not to be construed in any way as a waiver of the other provisions of this paragraph, and bidders must satisfy themselves through their own investigation as to the surface and subsurface conditions to be encountered at the site. By submitting a Proposal, the Bidder has certified that they have examined all items indicated in Section 2.07, "Examination of Plans, Specifications, and Site of the Work." Each proposal shall be enclosed in a sealed envelope and endorsed as specified in the Notice Invited Sealed Proposals. Bidders are warned the proposals containing irregularities of any kind, including erasures, omissions, conditions, alterations, or additional proposals may be rejected.
2.08 Withdrawals of Proposals - Any proposal may be withdrawn at any time prior to the time fixed in the Notice Inviting Sealed Proposals for the opening of bids, provided that a request in writing, executed by the bidder or their duly authorized representative, for the withdrawal of such bid, is filed with the City. The withdrawal will not prejudice the right of a bidder to file a new proposal.
2.09 Proposal Guaranty - Each proposal shall be accompanied by either a certified check, cashier's check, or bidder's bond of a surety company acceptable to the City in an amount not less than ten percent (10%) of the bid amount, and shall be made payable to the City.
2.10 Disqualification of Bidders - More than one proposal from an individual, firm or partnership, a corporation, or an association under the same or different names will not be considered.
Reasonable grounds for believing that any bidder is interested in more than one proposal for the work will be the cause of the rejection of all proposals in which such bidder is interested. If there is a reason to believe that collusion exists among the bidders, none of the participants in such collusion will be considered. Proposals in which the prices obviously are unbalanced may be rejected.
2.11 Bid Protest Procedures – Any protest of the proposed contract award shall be submitted in writing to the City Clerk no later than 5:00 p.m. on the fifth (5th) business day following the date of the
7.j.2
Packet Pg. 265 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-8 Project No. C1737-22
bid opening. If the fifth day falls on a weekend or holiday, the last day of the protest period shall be the first working day following the fifth day.
The protest must include the name, address, and telephone number of the person representing the protesting party. In addition,
(a) The party filing the protest must have submitted a bid for the Project. A Subcontractor of a party filing a bid for the project may not submit a bid protest. (b) The protest must contain a complete statement of the basis for the protest, and refer to the specific portion of the Contract Documents or the specific statute that forms the basis for the protest.
(c) The party filing the protest must concurrently transmit a copy of the protest to the proposed awardee.
Any bidder’s failure to fully comply with these procedures shall constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings.
The City shall review all timely protests prior to the award of contract. The City shall not be required to hold an administrative hearing to consider any protests, but may do so at its option. The City Council or the City Manager as designee if the authority to award the contract has already been granted by the City Council, may either reject the protest and award the project to the lowest responsible bidder or accept the protest and award the project to the next lowest responsible bidder. Nothing in this section shall be construed as a waiver of the City Council’s right to reject all bids.
2.12 List of Subcontractors - In accordance with the provisions of Section 4104 of the Public Contract Code, each proposal shall list the name, address and license number of each subcontractor to whom the bidder proposes to sublet portions of the work. A subcontractor is defined as one who contracts with the contractor to furnish materials and labor, or labor only, for performance of work.
Subcontractors shall be listed on the form provided in the Bid Proposal.
2.13 Required Contractor and Subcontractor Registration - In accordance with Labor Code Section 1725.5 and 1771.1, the contractor and all subcontractors shall be registered with the California Department of Industrial Relations (DIR) prior to the bid opening. All 2nd and lower tier subcontractors working on the project shall be registered with the Department of Industrial Relations prior to the work being performed. An inadvertent error in listing a subcontractor who is not registered may not be grounds for considering the bid non-responsive providing that any of the provision in Labor Code Section 1771.1(c) are satisfied.
7.j.2
Packet Pg. 266 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-9 Project No. C1737-22
SECTION 3: REVIEW OF BIDS, CONTRACT AWARD AND EXECUTION
3.01 Public Bid Opening and Initial Review - Bids which have been submitted in accordance with the requirements of the Bidding Documents, and which are received on or before the bid deadline will be opened publicly, and the dollar amounts of each bid shall be read aloud.
The City shall have the right to reject all bids. The City shall have the right to reject any bid not accompanied by the required bid security or any other item required by the Bidding Documents, or a bid which is in any other way incomplete or irregular. The City shall have the right to waive irregularities in a bid, and to award the Contract to the Lowest Responsible Bidder (as determined by the City), only if the irregularities are non-material and inconsequential.
3.02 Determination of Lowest Responsible Bidder - Criteria for determining low bid in all contracts with the City involving an expenditure of $5,000.00 or more shall be determined as the “Lowest Monetary Bidder” on the basis of the Engineer’s approximate estimate of the quantities of work to be done as set forth in the Bid Schedule, in accordance with the calculation criteria set forth on the bid.
After the Lowest Monetary Bidder has been determined, the Engineer shall review that Bidder’s bid in order to determine whether or not that Bidder is the “Lowest Responsible Bidder.” The term Lowest Responsible Bidder shall mean the Lowest Monetary Bidder whose bid is responsive, and who is responsible to perform the work, as required by the Contract Documents.
The term “responsive” is defined by California law, but generally means that the bid has been prepared and submitted in accordance with the Bidding Requirements. The term “responsible” is defined by California law, but generally means that the Bidder is able to demonstrate that it possesses: (1) the capacity to perform the work required by the Contract Documents with respect to financial strength, resources available, and experience; and (2) the integrity and trustworthiness to complete performance of the work in accordance with the Contract Documents.
The City will make its determination of responsibility based upon information submitted by Bidders contained in the Bidders Qualifications and Bidders References included in the Bid Forms and, if necessary, through interviews with previous cities, clients, design professionals, or subcontractors with whom the Bidder has worked. In determining whether or not a Bidder is responsible, the City may consider the following factors in relation to the work to be performed for this Project:
(a) Demonstrated financial strength including, but not limited to, resources available, bonding capacity, and available insurance.
(b) Demonstrated safety record including, but not limited to, Experience Modification Rate. (c) Successful completion of projects of similar scope and size. In reviewing this factor, the City may consider elements including, but not limited to, contract amount of completed projects, experience on public works projects, experience implementing prevailing wage certified payroll requirements, timeliness of performance and, if necessary, evaluation of the Bidder’s work by previous cities, clients, design professionals, or subcontractors. (d) Sufficiency of contract administration and construction management systems including, but not limited to, proposed scheduling tools, proposed subcontract forms, proposed progress payment applications, and proposed certification of payroll documents. (e) History of claims, litigation, termination or disqualification from projects.
If the Engineer finds that the Lowest Monetary Bidder submitted a responsive Bid and that the Bidder is responsible, then that Bidder shall be deemed the apparent “Lowest Responsible Bidder,” and the Engineer shall report the findings to the City Council.
7.j.2
Packet Pg. 267 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-10 Project No. C1737-22
If the Engineer finds that the Lowest Monetary Bidder’s bid is not responsive, or that the Lowest Monetary Bidder is not responsible, then the Engineer may review the responsiveness and responsibility of the next Lowest Monetary Bidder. If the Engineer finds that the next Lowest Monetary Bidder is responsive and responsible, then that next lowest Bidder shall be deemed the apparent “Lowest Responsible Bidder,” and Engineer shall report its findings as recommendations to the City Council. This process may continue until the Engineer finds the Lowest Monetary Bidder which is also responsive and responsible.
In the event that one or more Low Monetary Bidders are found by the Engineer to be nonresponsive or non-responsible, those Bidders will be given notice and a reasonable opportunity to present additional relevant evidence to the Engineer for consideration, within five (5) working days after the Bidder receives the notice.
All findings by the Engineer shall be reported as recommendations to the City Council. The City Council reserves the right to reject any or all Bids, and to waive any irregularity. No Bid shall be binding upon the City until after the Agreement is signed by both the Contractor and the City. If the City Council determines that it is in the City’s best interest to award the Agreement, a Notice of Award shall be sent to the Lowest Responsible Bidder as determined by the City Council. The City Council’s decision shall be final.
The City may investigate the responsibility and qualifications of all Bidders to whom the award is contemplated for a period not to exceed ninety (90) calendar days after the Bid opening, during which time no bid shall be withdrawn by the Bidders. The ninety (90) day review period may be extended upon the written request by the Engineer and written approval by the affected Bidder.
3.03 Notice of Award – Should the City decide to proceed with the award of contract the City shall issue a Notice of Award to the lowest responsible bidder.
3.04 Contract Execution - Within fifteen (15) calendar days after receipt of the Notice of Award, the bidder shall submit to the City two (2) originals of the signed agreement, the required contract bonds and certificates of insurance. If the bidder fails or refuses to enter into a contract to do the work, then the proposal guaranty accompanying the bid shall be forfeited to the City. After the Bidder has properly submitted these documents, the City will execute the Agreement and issue a Notice to Proceed.
3.05 Status of Contractor - The right of general supervision by the City shall not make the contractor an agent of the City, and the liability of the contractor for all damages to persons or to public or private property arising from the contractor's execution of the work shall not be lessened because of such general supervision.
3.06 Assignment - No agreement or portion thereof maybe assigned without consent of the Council, except that the Contractor may assign money due which will accrue to them under the Agreement. If given written notice, such assignment will be recognized by the City to the extent permitted by law, but any assignment of money shall be subject to all proper setoffs and withholdings in favor of the City and to all deductions provided for in the Agreement. All money withheld, whether assigned or not, shall be subject to being used by the City for completion of the work, should the Contractor be in default.
Any attempt to assign or delegate the Agreement without the written consent of the City shall be void and of no force and effect. Consent by the City to one assignment shall not be deemed to be consent to any subsequent assignment.
3.07 Recognition of Subcontractors - No subcontractors will be recognized as such, and all persons engaged in the work of construction will be considered as employees of the contractor and their work shall be subject to the provisions of the contract, including specifically these general stipulations, the specifications and the contract drawings.
7.j.2
Packet Pg. 268 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-11 Project No. C1737-22
3.08 Return of Bid Security - Within ten (10) working days after the execution of the Agreement, the City will return the proposal guarantees accompanying the proposals that are not to be considered in making the award. All other proposal guarantees will be held until the Agreement has been fully executed, after which, they will be returned to the respective bidders whose proposals they accompanied.
3.09 Forfeiture of Proposal Guaranty - If Bidder does not properly execute the contract and submit the acceptable bonds, insurance and certifications within the specified time; this shall be just cause for the annulment of the award and the forfeiture of the proposal guaranty to the City. The City may then award the contract to next Lowest Responsible Bidder. The forfeited proposal guaranty may be utilized by the City in accordance with Public Contract Code, Sections 20170 through 20174.
3.10 Contract Bonds - Before execution of the contract by the City, the Contractor shall file with the City surety bonds satisfactory to the City in the amounts, and for the purposes, noted below.
Said bond shall be on the form furnished by the City herein. (a) Performance Bond - The contractor shall furnish and bear the cost of a bond of a surety company acceptable to the City, which bond is conditioned upon the faithful performance of all covenants and stipulations under this contract within the time prescribed, in a manner satisfactory to the City, and that all materials and workmanship will be free from original or developed defects. The amount of the bond shall be one hundred percent (100%) of the total contract price; as such sum is set forth in the agreement.
Said bond shall be on the form furnished by the City herein.
As a condition precedent to satisfactory completion of this contract, an amount equal to ten percent (10%) of the estimated contract cost shall hold good for the period specified in said bond after completion and acceptance of the work by the City. (b) Labor and Material Bond – The contractor shall furnish and bear the cost of a bond of a surety company acceptable to the City in the sum not less than one hundred percent (100%) of the total contract price, as such sum is set forth in the agreement, for the payment in full of all persons, companies, or corporations who perform labor upon or furnish materials to be used in the work under this contract, in accordance with the provisions of Section 4200 to 4208, inclusive (Chapter 3, Division 5), of the Government Code of the State of California, and any acts amendatory thereof. The bond shall be maintained by the Contractor in full force and effect until the work is accepted by the City and until all claims for materials and labor are paid.
Said bond shall be on the form furnished by the City herein. (c) Warranty Bond - The Contractor shall furnish a warranty bond in the amount of ten percent (10%) of the final contract price (total cost including change orders) to guaranty his work for two (2) years after acceptance of the work by the City Council.
Bonds shall be duly executed by a responsible corporate Surety, licensed and authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California. Each bond shall be signed by both the Contractor and Surety and the signature of the authorized agent of the Surety shall be notarized.
The Contractor shall pay all bond premiums, costs and incidentals. Should any bond become insufficient due to an increase in the contract amount, the Contractor shall obtain supplemental bonding within ten (10) days.
7.j.2
Packet Pg. 269 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-12 Project No. C1737-22
Should any Surety at any time be unsatisfactory to the City, notice will be given the Contractor to that effect. No further payments shall be deemed due or will be made under the Agreement until a new Surety shall qualify and be accepted by the City.
Changes in the work, or extensions of time, made pursuant to the Agreement, shall in no way release the Contractor or Surety from their obligations. The requirement for notifying the Surety of such changes or extensions shall be waived by the Surety.
3.11 Notification of Surety Companies - The surety companies shall familiarize themselves with all conditions and provisions of this contract and they waive the right of special notification of any change or modification of this contract or of extension of time, or of decreased or increased work, or of the cancellation of the contract, or of any other act(s) by the City or City's authorized agents, under the terms of this contract, and failure to so notify the aforesaid surety companies of changes shall in no wise relieve the surety companies of their obligation under this contract.
3.12 Power of Attorney - Attorneys-in-fact who sign bid bonds or contract bonds must file a certified and effectively dated copy of their Power of Attorney with each bond.
3.13 Insurance Requirements - Contractor shall provide at their own cost and expense from contract award date to acceptance of the work covered by the contract:
(a) Workmen's Compensation and Employer's Liability Insurance of not less than the amount shown in the Special Provisions for all of their employees to be engaged in the work under this contract. Should any such work be sublet, the contractor shall require each of their subcontractors at any tier similarly to provide Workmen's Compensation and Employer's Liability Insurance, all in strict compliance with Federal and State laws. (b) Personal Injury, Bodily Injury and Property Damage Liability Insurance (including automobiles, products and/or completed operations coverage) and Aircraft and Watercraft Bodily Injury Liability and Property Damage Liability Insurance if contractor uses owned or non-owned water aircraft in their operation, with Personal Injury and Bodily Injury (including death resulting therefrom) of not less than a combined Personal Injury and Property Damage Liability limit of not less than the amount shown in the Special Provisions. Should any work covered by the contract be sublet contractor shall require each of their subcontractors of any tier similarly to provide the aforesaid coverages.
(c) All Risk (excluding Earthquake and Flood) Builder's Risk Insurance in an amount not less than the value of any work under this contract, except for buried pipelines and appurtenances which need not be included in the insurance value. Under the policies of insurance described above, each policy shall contain the provision for thirty (30) days written notice submitted by registered mail from the insurance carrier(s) to the City prior to cancellation or reduction in coverage.
3.14 Special Requirements - Under the policy of insurance described in Section 13.13-b, the policy shall contain the following provisions:
(a) The City and the City's officers, representatives, agents and employees shall be named as additional insureds.
(b) Endorsement providing that such insurance is primary insurance and no insurance of the additional insureds shall be called on to contribute to a loss. (c) Endorsement providing that such insurance shall not contain any exclusion regarding loss or damage to property caused by explosion or resulting from collapse of buildings or structures or damage to property underground, commonly referred to as "XCU" hazards.
7.j.2
Packet Pg. 270 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-13 Project No. C1737-22
(d) Standard cross-liability clause covering personal injury, bodily injury (including death resulting therefrom), and property damage.
3.15 Builders Risk Insurance - Under the policy of insurance, the policy shall contain the following provisions:
(a) The City shall be included as insured.
(b) Losses shall be payable to the contractor and City as their interest may appear. (c) Deductible amounts of all losses covered by insurance shall be borne by the contractor.
3.16 Certificates - Prior to beginning work, contractor shall furnish certificates satisfactory to the City as to contents and carriers of such insurance.
3.17 Legal Address of Contractor - Contractor's address as shown in the proposal, as well as such office or headquarters the contractor establishes at the site of work, hereby are designated as addresses to which drawings, samples, notices, letters, articles, or other communications to the contractor may be mailed or delivered. The delivery at either of these places of any item or communication from the City or agents thereof to the contractor shall be deemed sufficient service of such delivery. Contractor's address as shown in the proposal may be changed at any time by notice in writing from the contractor to the City. Nothing herein contained shall be deemed to preclude or render inoperative the service of any drawing, sample, notice, letter, or other article of communication to or upon the contractor personally.
3.18 Office of Contractor at Site - During the performance of the contract, Contractor shall maintain a suitable office at the site of work which shall be the headquarters of a representative authorized to receive drawings, instructions or other communications or articles from the City or City's agents; any such thing given to said representative or delivered at the contractor's office at the site of work when absent shall be deemed to have been given to the contractor. Contractor shall maintain a complete set of plans and specifications at the site office whenever work is in progress.
7.j.2
Packet Pg. 271 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-14 Project No. C1737-22
SECTION 4 - SCOPE AND CONTROL OF WORK
4.01 Work to be Done – The work to be done consists of furnishing all labor, materials, tools, equipment and services necessary to complete the project, as further described in the Notice to Bidders of these Specifications, and as necessary to leave the site in a neat and finished condition with all equipment properly installed and working to the satisfaction of the Engineer.
While the City has endeavored to accurately represent in the plans and specifications the physical conditions which may affect the cost of the proposed work, the City does not warrant the completeness or accuracy of such information. It is the Contractor’s responsibility to ascertain the existence of any such conditions affecting the cost of the work, which would have been disclosed by reasonable examination of the site.
Conclusions pertaining to any test, investigation, statement or estimate of fact incorporated in the plans and specifications shall be considered by the Contractor to be a recommendation only. The Contractor may request equal access to the underlying or background information to arrive at an independent opinion thereon, including thedetermination of how reliable might be any conclusion appearing in (or inferred from) the information. The Contractor may not rely upon “record drawings” or similar final or accepted drawings or maps constructed on public or private property. Such information may be used for reference only. Actual locations and depths shall be determined by field investigations by the Contractor.
No oral or telephonic agreement or conversation with any officer, agent, or employee of the City or the Engineer, either before or after execution of the contract, shall affect or modify any of the terms or obligations contained in any of the contract documents.
4.02 Plans and Specifications - It is the intent of the Plans and Specifications to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. For convenience, the Specifications are arranged in several sections, but such separation shall not be considered as the limits of the work required by any separate trade. The terms and conditions of such limitations are wholly between the Contractor and the project subcontractors. In general, the Special Provisions, General Provisions, and other sections of the specifications indicate the responsibilities of the Contractor and the quality of material and methods of workmanship. The plans indicate dimensions, quantities, positions, and various other details of construction.
Any work, materials or equipment that may be reasonably inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for.
When words, which have a well-known technical or trade meaning, are used to describe the work, materials or equipment, such words shall be interpreted in accordance with that meaning. See General Provisions, Section 6.03, “Trade Names or Equals”.
Subheadings and titles printed on the drawings in these General Provisions, in the specifications, and elsewhere in the contract documents, are inserted for the convenience of reference only, and shall not be taken or considered as having any bearing on the interpretation thereof.
4.03 References to Standards and Codes - Reference to standard specifications, manuals or codes of any technical society, organization or association, or to the Laws or Regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or Laws or Regulations in effect at the time of the opening of bids (or, on the Effective Date of the Agreement if there were no bids), except as may be otherwise specifically stated. However, no provisions of any referenced standard specifications, manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change the duties and responsibilities of City, Contractor or Engineer, or any of their consultants, agents or employees, from those set forth in the Contract Documents, nor shall it be effective to assign to the Engineer, or any of the Engineer’s Consultants, agents or employees, any duty or authority to supervise
7.j.2
Packet Pg. 272 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-15 Project No. C1737-22
or direct the furnishing or performance of the work or any duty or authority to undertake responsibility for the Contractor.
4.04 Authority of the Engineer – The City has the final authority in all matters affecting the work. Within the scope of the Agreement, the Engineer has the authority to enforce compliance with the Plans and Specifications and the Contractor shall promptly comply with instructions from the Engineer.
The decision of the Engineer is final and binding on all questions relating to: quantities; acceptability of materials furnished and work performed; equipment; work execution, rate of progress or sequence of work; and interpretation of the Plans, Specifications, or other drawings. This shall be precedent to any payment under the Agreement, unless otherwise ordered by the City.
4.05 Contract Documents and Precedence - The Contract Documents consist of the documents listed below, in order of precedence. If there is a conflict between component parts of the Contract Documents, the document highest in precedence controls. (a) Change Orders.
(b) Project Directives.
(c) Permits issued by other agencies.
(d) Permits issued by the City.
(e) Agreement and required agreement forms – Bid Bond, Faithful Performance and Labor and Materials Bonds, Warranty Bond, Insurance Endorsements, Worker’s Compensation Certification.
(f) Project Specifications, in the following order - Addenda, Bid Proposal including all Bid Proposal Forms, Notice Inviting Sealed Proposals, Special Provisions, Technical Provisions, Exhibits to the Proposal, and General Provisions. (g) Project Plans and Drawings.
(h) City Standard Specifications.
(i) City Standard Plans.
(j) Reference Specifications, in the following order – State of California Department of Transportation (Caltrans) State Standard Specifications (current edition), Standard Specifications for Public Works Construction “Greenbook”. (k) Reference Plans, in the following order – State of California Department of Transportation (Caltrans) State Standard Plans (2010 edition), Standard Plans for Public Works Construction (2010 edition).
All of the individual components of the Contract Documents are intended to be complementary and what is required by one shall be binding as if required by all. Interpretation of a disputed meaning or intent of the plans and specifications shall be made initially by the Engineer in accordance with the application of the order of precedence. Any final decision required regarding precedence and the clarification of discrepancies in the Contract Documents shall be made by the Engineer.
4.06 Interpretation of Specifications and Drawings - The specifications and the contract drawings are intended to be explanatory of each other. Any work indicated in the contract drawings and not in the specifications, or vice versa, is to be executed as if indicated in both. Should it appear that the work to be done, or any of the matters relative thereto are not sufficiently detailed or explained in these contract documents, including the contract drawings, the contractor shall apply in writing to the Engineer for such further explanations as may be necessary and shall conform thereto as part of this contract so far as may be consist with the terms of the contract. Should any doubt or question arise respecting the true meaning of the specification, the Engineer shall make the final decision.
4.07 Figured Dimensions - Figured dimensions on the contract drawings shall in all cases be given precedence over scaled dimensions. If figured dimensions do not correspond to scaled
7.j.2
Packet Pg. 273 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-16 Project No. C1737-22
dimensions, contractor shall request Engineer to verify the accuracy of the figured dimensions. It shall be the responsibility of the contractor to ascertain the correct scale of all contract drawings within their possession, including those which may have been reduced for reproduction.
4.08 Errors or Discrepancies - If the contractor, in the course of the work, discovers any discrepancies between the drawings and the conditions of the ground, or any errors or omissions in the drawings or in the layout given by stakes, points or instructions, shall have the duty to inform the Engineer immediately in writing, and the Engineer shall promptly verify the same. Any work done after such discovery, until authorized, will be done at the contractor’s risk.
4.09 Drawings to be Furnished by Contractor - As soon as practical after the execution of this contract, the contractor shall supply drawings of devices to be furnished hereunder as are called for herein or as are required by the Engineer to make clear the details of construction and to demonstrate fully that all materials and equipment comply with the intent and provisions of this contract. Unless otherwise herein specified, such drawings shall be submitted to the Engineer for review. Should the Engineer take exception with any drawings furnished by the contractor, the contractor shall make the revisions required, and resubmit them to the Engineer for review. After a satisfactory review by the Engineer, these drawings shall become a part of this contract and the work shall be done in conformity therewith. No such work shall be begun or devices purchased until the review of the drawings detailing such items have been completed. The review of the drawings shall not relieve the contractor of responsibility, or waive or modify any of the provisions or requirements of this contract.
The Engineer's review of drawings submitted by the contractor will be for, and will cover, only generally conformity to the plans and specifications and will not constitute a blanket approval of all dimensions, quantities and details of the material or equipment shown by (nor shall review relieve the contractor of responsibility for errors contained in) such drawings.
All shop drawings submitted by the various subcontractors which require review of the City's representative shall first be sent to the contractor who shall keep a record of the drawing numbers and the date of their receipt.. Contractor shall submit the drawings to City's representative for review in time to prevent delays in delivery of materials.
Contractor shall thoroughly check all such shop drawings for measurements, size of member, materials and details to make sure they conform to the intent of the plans and specifications. Drawings found to be inaccurate or otherwise in error shall be returned by the contractor to the subcontractor for correction before they are submitted by the contractor to the City's representative for review.
4.10 Additional Drawings by City - Contract drawings are intended to be comprehensive and to indicate in detail the scope of the work. However, the Engineer may furnish the contractor additional drawings during the progress of the work in order to clarify and define in greater detail the intent of the contract drawings or specifications. Contractor may request such detailed drawings by submitting a request in writing to the Engineer at least two (2) weeks in advance of the time they are required.
4.11 Lines and Grades - All work under this contract shall be constructed to the lines, grades and elevations shown on the contract drawings. Contractor shall establish the lines, grades and elevations unless it is otherwise specified in the Special Provisions.
4.12 Record Documents – The Contractor shall keep at the worksite a record copy of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Work Directives, Field Orders and written interpretations and clarifications. These record documents together with all approved submittals, samples and shop drawings will be available to the Engineer as a reference at all times. Upon completion of the work, these record documents will be delivered to Engineer.
4.13 Record Drawings –The Contractor shall prepare and update a master “as-built” set of red ink-lined plans, to be reviewed and approved by the Engineer at the end of every month. Drawings shall contain information showing where actual installation differs from that shown on the original drawings, where
7.j.2
Packet Pg. 274 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-17 Project No. C1737-22
underground or concealed features are found noting alignment (to 0.25’) and elevation (to 0.1’ ), field changes or deletions of work, and any additional work by change order. Upon the project’s completion, and prior to the project’s acceptance, the Contractor shall submit to the City the completed as-built record Drawings on one (1) set of full size prints prepared on 22" x 34" paper.
Record Drawings are full size drawings (Plans) which marked up during construction to delineate the actual in-place constructed conditions. Record Drawings shall be provided by the Contractor for this Project. Requirements for Record Drawings as specified elsewhere shall supplement the requirements specified herein.
4.14 Reuse of Documents - Neither the Contractor nor any Subcontractor or supplier or other person or organization performing or furnishing any of the work under a direct or indirect agreement with the City shall have any title or rights to any of the Drawings, Specifications or other documents (or copies thereof) which bear the seal of the design engineer. Such documents shall not be reused on extensions of the project or for any other project without written consent of the City and the design engineer.
4.15 Subsurface Data – If completed, all soil and soil test data, water table elevations, and soil analyses included or referred to in the Contract Documents apply only at the location of the test holes and to the depths indicated. If completed, soil test reports for test holes which have been drilled are available for inspection at the office of the Engineer. Any additional subsurface exploration shall be done by Bidders or the Contractor at their own expense.
The elevation of the water table indicated by soil test reports is that which existed on the date the test hole was drilled. It is the Contractor’s responsibility to determine and allow for the possibility of differing ground water elevations on the date of the project’s construction. A difference in elevation between ground water shown in soil boring logs and ground water actually encountered during construction will not be considered as a basis for extra work.
4.16 Right-of-Way – Acquisition of right-of-way or permanent easements necessary for the improvements as shown on the plans will be provided by the City. Unless otherwise provided, the Contractor shall make any required arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas, easements, and temporary facilities required. Contractor shall identify and hold the City harmless from all claims for damages resulting from such actions.
4.17 Removal of Defective and Unauthorized Work - Should the Contractor deliberately proceed with any portion or phase of construction which is obviously incorrectly indicated in the contract plans or documents, he shall be responsible for any corrective measures required to make adequate repairs or adjustment. This shall include any work done beyond the lines and grades shown on the plans or established by the Engineer, or any extra work done without written authority.
All work that has been rejected shall be remedied or removed and replaced by the Contractor in an acceptable manner and no compensation will be allowed for such removal or replacement. If the Contractor fails to remedy rejected work within ten (10) working days after written demand, the City may, without prejudice to other remedies, sell such materials at auction or at private sale, or otherwise dispose of such material. The Contractor shall be entitled to the proceeds of such sale, if any, in excess of the costs and damages for which the Contractor is liable to the City, including reasonable attorneys’ fees and expenses and compensation for the City’s services and expenses.
4.18 Acceptance of Defective Work - The City shall have the option, at its sole discretion and by written notice to the Contractor, to accept defective work instead of requiring its removal or correction, in which case the contract sum shall be reduced by an amount equal to the difference between the value to the City such work would have were it complete, correct, and in conformity with the Contract Documents and the value to the City of such defective work. Such option shall be exercised solely by written notice to the Contractor and shall not be implied from any act or omission by the City or the Engineer. If the remaining payments and retention are insufficient to cover the amount of the reduction of the contract sum, the Contractor shall promptly pay to the City the amount of any such deficiency.
7.j.2
Packet Pg. 275 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-18 Project No. C1737-22
4.19 Submittals - Within ten (10) working days following the Notice to Proceed, the Contractor shall provide a detailed list for review and approval of all individual submittals required to be submitted under the contract. The list shall reference the specification section and paragraph that requires the submittal along with the date the Contractor plans to transmit the submittal to the City for review.
Unless otherwise requested by the Engineer, submittals shall be provided electronically in .pdf format at least twenty-eight (28) calendar days prior to the approval being necessary for the work.
Submittals shall be transmitted with a Submittal Cover Letter form as approved by the Engineer. Large submittals consisting of reports, oversized or colored pages, full sized shop drawings, manuals contained in binders, or submittals in other forms not easily reproduced shall be provided in hard copy format with six (6) copies.
For items requiring shop drawings, no materials shall be furnished, and no work shall be performed, until the drawings have been favorably reviewed. Shop drawings shall be of a size and scale to clearly show all necessary details.
After review by the City of each of the Contractor's submittals, the material will be returned to the Contractor marked with actions defined as follows:
(a) NO EXCEPTIONS TAKEN - Accepted subject to its compatibility with future submissions and additional partial submissions for portions of the work not covered in this submission.
Does not constitute acceptance of deletion of specified or required items not shown in a partial submission.
(b) MAKE CORRECTIONS NOTED - The same as item (a), except that minor corrections as noted by the City shall be made by the Contractor. No resubmission is required. (c) REVISE AND RESUBMIT - Rejected because of major inconsistencies or errors which shall be resolved or corrected by the Contractor prior to subsequent review by the City. (d) REJECTED - Submitted material does not conform to plans and Specifications in major respects. This material is not expected to be resubmitted. (e) SUBMIT SPECIFIED ITEM - Submittals not reviewed by the City but received for record purposes.
Favorable review of the shop drawings by the Engineer is interpreted to mean that there is substantial and acceptable conformance with the contract plans, but details of design may not necessarily be checked for adequacy or accuracy. Such acceptance shall not relieve the Contractor from the responsibility for errors or omissions in the shop drawings or from deviations from the contract documents unless such errors, omissions, or deviations were specifically called to the attention of the Engineer in writing. The Contractor shall be responsible for the correctness of the shop drawings, for shop fits and field corrections, and for the results obtained by the use of such plans.
4.20 Substitutions – Proposed requests by the Contractor for changes in products, materials, equipment, and methods of construction required under the Contract Documents after the award of contract are considered "requests for substitutions.” For proposed “or equal” substitutions, attention is directed to General Provision Section 6.03, “Trade Names or Equals.” Each request for substitution shall be prepared and presented to the City in accordance with the procedures for submittals, except that the following additional information shall be provided. (a) An explanation of the advantages to the City for accepting the substitution. (b) A comparison of significant qualities of the proposed substitution with those specified. (c) A list of changes or modifications needed to other parts of the work and to construction performed by the City and separate Contractors, that will be necessary to accommodate the proposed substitution.
7.j.2
Packet Pg. 276 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-19 Project No. C1737-22
(d) A statement indicating the substitution's effect on the Construction Schedule compared to the Baseline Construction Schedule without acceptance of the substitution. Indicate the effect of the proposed substitution on overall contract time. (e) Cost information, including a proposal of the net change, if any, in the Contract Sum. (f) Certification that the substitution is equal to or better in every respect to that required by Contract Documents, and that it will perform adequately in application indicated. Include Contractor's waiver of rights to additional payment or time extensions, that may be necessary because of the substitution's failure to perform adequately.
No extension of time will be allowed through failure of the Contractor to either transmit requests for substitution sufficiently in advance of the work, or on account of processing time outside the time limits noted.
4.21 Construction Staking Lines and Grades - Unless otherwise stated in the Special Provisions, the Contractor shall provide, preserve, and replace if necessary, all of the necessary construction stakes required for the construction of the project. Grades for underground conduits will be set on the ground surface and shall then be transferred to the bottom of the trench by the Contractor.
Stakes or marks will be set by a California Licensed Surveyor or a California Registered Civil Engineer to establish the lines and grades required for the completion of the work as specified in the Contract Documents. It shall be the Contractor's responsibility to notify the Engineer of any discrepancies found between field grades and notes shown within the Contract Documents.
Contractor shall furnish horizontal control and cut sheets to the Engineer immediately upon the setting of construction or boundary markers. Upon completion, all work shall conform to the lines, elevations, and grades shown on the plans.
4.22 Inspection of the Work - All work is subject to inspection and approval of the Engineer.
Unless otherwise stated in the specifications, the City shall perform all required inspections. The Contractor shall notify the Engineer before noon of the working day before inspection is required. Unless otherwise authorized, work shall be done only in the presence of the Engineer. Any work done without proper inspection will be subject to rejection. The Engineer shall at all times have access to the work during its construction at shops and yards as well as the project site. The Contractor shall provide every reasonable facility for ascertaining that the materials and workmanship are in accordance with the Contract Documents. Inspection of the work shall not relieve the Contractor of the obligation to fulfill all conditions of the contract.
If a portion of the work is covered contrary to the Engineer’s request or direction, or contrary to the requirements of the Contract Documents, it must, if required in writing by the Engineer, be uncovered for the Engineer’s observation and be replaced at Contractor’s expense without adjustment of the contract time or the contract sum.
If a portion of the work has been covered, which is not required by the Contract Documents to be observed or inspected prior to it’s being covered and which the Engineer has not specifically requested to observe prior to it’s being covered, the Engineer may request to see such work and it shall be uncovered and replaced by Contractor. If such work is in accordance with the Contract Documents, the costs of uncovering and replacing the work shall be added to the contract sum by change order; and if the uncovering and replacing of the work extends the contract time, an appropriate adjustment of the contract time shall be made by change order. If such work is not in accordance with the Contract Documents, the Contractor shall pay such costs and shall not be entitled to an adjustment of the contract time or the contract sum.
Regular working hours for City Construction Inspectors are between 7:30 a.m. and 4:00 p.m., Monday through Friday, excluding City holidays. If the Contractor works outside these times, the Contractor may be charged for additional inspection. Inspection by the Engineer or by a City inspector, or
7.j.2
Packet Pg. 277 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-20 Project No. C1737-22
any order measurement, approved modifications, certificate or payment of money, or acceptance of any part of whole of the work, or any extension of time, or any possession by the City or its agents, shall not operate as a waiver for any provision of this contract or of any power reserved therein to the City, or any right to damage thereunder; no breach of this contract shall be held to a waiver of any or subsequent breach. All remedies shall be taken and construed as cumulative.
4.23 Testing - Unless otherwise stated in the Contract Documents, all required testing will be performed directly by an independent laboratory coordinated and paid for by the City. Contractor shall cooperate with the City in coordinating the necessary testing. The coordination of testing, including the number and location of tests, shall be under the direction of the Engineer or their designee. All compaction test sites deeper than five (5’) feet below grade shall be properly shored by the Contractor to protect testing personnel.
The cost for performing re-tests due to failures, or additional call-outs if work is not ready to test, will be charged to the Contractor. The City shall require retesting until all required tests are successfully passed.
7.j.2
Packet Pg. 278 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-21 Project No. C1737-22
SECTION 5 – CHANGES IN WORK
5.01 Limited City Authority to Approve Change Orders - The Contractor recognizes that the City is a public agency and that it can only act through its duly authorized agents. In this regard, the Contractor agrees that only written change orders, executed by the governing body of the City, shall be valid. The Engineer shall have no authority to issue a change order unless so specifically authorized, and no person shall have authority to issue any oral change order.
5.02 Contractor Liability for Unapproved Change Orders - Unless a valid change order is issued, all changes in the work performed by the Contractor shall be at the Contractor’s own risk, and shall not be entitled to any additional compensation. Furthermore, the Contractor may be required to make the work conform to the plans and specifications. No act or series of acts by the City during the course of the contract shall be deemed to constitute a waiver of the City’s right to rely upon the provisions of this Section 5, “Changes in Work”.
5.03 Non-Material Change Requests by the Contractor - Changes in the plans and specifications requested in writing by the Contractor, which do not materially affect the work and which are not detrimental to the work or to the interests of the City, may be granted to facilitate the work, when approved in writing by the Engineer. If such changes are granted, they shall be made at a reduction in cost or at no additional cost to the City. Nothing herein shall be construed as granting a right to the Contractor to demand acceptance of such changes or to increase the contract sum or contract time as a result of the proposed change.
5.04 Effect of Extension of Time - The granting of any extension of time due to delays which, in the judgment of the City, are unavoidable delays shall in no way operate as a waiver on the part of the City of its rights under this contract.
5.05 Letters of Instruction - The Engineer may issue letters of instruction in the form of Field Orders, Clarifications, responses to Requests for Information, or any other document which makes interpretations or clarifications to the Contract Documents that do not modify the scope of work or involve an adjustment in the contract sum or contract time. Letters of Instruction shall be binding upon the Contractor, and the Contractor shall promptly carry out the requirements of such Letters of Instruction.
5.06 Requests for Information, Inconsistencies and Changed Conditions - Before undertaking each part of the work, the Contractor shall carefully study all pertinent figures shown in the Contract Documents and verify that all applicable field measurements are free of conflicts, errors, discrepancies, inconsistencies and omissions. If such conditions are discovered, the Contractor shall notify the Engineer by writing a Request for Information, and await direction from the Engineer before proceeding.
If the Contractor encounters a changed condition, as defined by one or more of the conditions below, the Contractor shall notify the Engineer by writing a Request for Information before disturbing the condition further.
(a) Material differing from that represented in the Contract which the Contractor believes may be hazardous waste, as defined by Health and Safety Code, Section 25117 that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provision of existing law; and
(b) Subsurface or latent physical conditions at the site differing materially from those represented in the Contract Documents; and
(c) Unknown physical conditions at the site of any unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in the work and of the character provided for in the Contract Documents.
7.j.2
Packet Pg. 279 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-22 Project No. C1737-22
No extension of Contract time shall be made by the City due to the Contractor’s failure to provide a timely written notice of any inconsistency or changed condition requiring direction. The Engineer will respond to the Contractor’s Request for Information within 10 working days, providing an interpretation, clarification or change order for an appropriate adjustment in contract time and cost pursuant to General Provisions, Section 5.07, and “Change Orders.” Contractor shall wait for the Engineer’s written response to a Request for Information before proceeding with any work.
The Contractor shall not be liable to the City for failure to report any conflict, error, or discrepancy in the Contract Documents, unless the Contractor had actual knowledge or could foresee such conditions as may be discovered by a reasonable examination of the work site or materials. If the Contractor performs any construction activity in which he knows or should know involves an error, inconsistency, ambiguity, or omission referred to in this Section, without notifying and obtaining the written consent of the Engineer, Contractor shall be responsible for the resultant costs, including, without limitation, the costs of correcting defective work. However, in an emergency affecting the safety of persons or property, the Contractor shall take all reasonably necessary precautions to prevent or minimize damage, injury, or loss.
5.07 Extra and Omitted Work - Whenever corrections, alterations or modifications of the work under this contract are ordered and approved by the Engineer and increase the amount of work to be done, such added work shall be known as Extra Work. When such corrections, alterations or modifications decrease the amount of work to be done, such deleted work shall be known as Omitted Work. The General and Special Provisions shall apply with equal force to all extra and omitted work.
When the Contractor considers that any changes ordered involve extra or omitted work, Contractor shall immediately notify the Engineer in writing and subsequently keep them informed as to when and where the alleged extra work is to be performed.
When extra work reports are agreed upon and signed by both parties, they shall become the basis of payment. When extra work is still under negotiation or has not been agreed upon, the Contractor shall keep daily detailed and accurate records itemizing each element of cost and shall provide certified payroll, invoices, and other substantiating records and documentation with records and/or claims for compensation to be provided no later than 30 days following the time in which the work claiming to be extra was performed.
Unless notification of extra work is documented, and unless a complete statement of materials used and expenses incurred is furnished by the Contractor, the Contractor shall not be entitled to payment of such alleged extra work, and any future claims for compensation will be invalid.
Payment for extra work shall be in accordance with General Provisions, Section 5.08 - “Change Orders”. Omitted work shall not constitute a claim for damages on account of anticipated profits on the work that may be omitted.
5.08 Change Orders – At any time during the progress of the work, and without in any way rendering void the Agreement, the City may order alterations, additions or deductions from the work by change order, without notice to sureties. When so ordered in writing, the Contractor shall proceed with work as directed by the change order.
The change order shall describe the change in the work, the adjustment of the contract sum (if any), and the adjustment of the contract time (if any). The Contractor shall not be entitled to any extension of time for the completion of the work by virtue of any change order unless the change order specifically provides for this. If, after receiving a change order, the Contractor requests an extension of time, within five (5) working days the Contractor must file a written claim to that effect for consideration by the Engineer.
The process of submitting a proposed change, a cost proposal, or negotiating an agreed upon change order, or any failure to reach an agreement as to an adjustment in the contract sum or the
7.j.2
Packet Pg. 280 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-23 Project No. C1737-22
contract time, shall not relieve the Contractor of the obligation to perform in accordance with the Contract Documents.
A change order may be in the form of a City directed change order or an agreed upon change order. Upon the receipt of either form of change order, the Contractor shall proceed promptly and diligently with the extra work.
(a) City Directed Change Orders - A City directed change order may be issued by the City without the Contractor’s signature where the City determines that it is in the City’s best interest to proceed with the work, and the change does not materially alter the character of the work. The Contractor shall be deemed to have accepted the terms of any City directed change order unless the Contractor asserts a claim with respect to the change order, no later than ten (10) working days following the Contractor’s receipt of the change order. See General Provisions, Section 5.09`, “Disputed Work”. (b) Agreed Upon Change Orders - Within ten (10) working days after receiving a request from the City for a written proposal for an agreed upon Change Order, the Contractor shall provide the Engineer with a cost proposal in a form satisfactory to the Engineer, setting forth the Contractor’s proposed adjustments to the contract sum and contract time for performing the extra work.
Change order pricing for all change orders, whether, additive, deductive, or both, will be governed by the following:
1) Prices specified in the Contract Documents will apply to cost impacts involving items for which the Contract Documents specify prices. 2) Cost impacts involving items for which the Contract Documents do not specify prices may be paid on a fixed lump sum basis as approved by the City or by Force Account.
3) Fixed Lump Sum Pricing. For cost impacts involving items for which the Contract Documents do not specify prices, the Contractor shall submit a detailed change order request which includes a line item cost for labor, materials, equipment, and overhead costs unless the City after being informed of extra work authorizes the work to be performed by Force Account. If a detailed change order request is submitted and approved the Change Order total shall be the sum of and limited to the agreed upon fixed price which shall identify the direct and indirect costs for labor, materials, equipment, and markup as calculated below.
a. Labor. The Contractor and the City shall agree upon the estimated number of hours required per worker and the Contractor shall calculate the cost of labor for the workers (including foremen when authorized by the City Representative), to be used in the direct performance of the Work. The cost of labor scheduled to be utilized in performing the Work, whether the employer is the Contractor, a subcontractor or other entity engaged in the performance of the Work, will be the sum of the following:
i. Wages. The actual hourly rates paid will include any employer fringe benefit payments to or on behalf of the workers for health and welfare, pension, vacation and similar purposes. The wages listed in the change order request
shall not be less than the current prevailing wage rates.
Additionally, the wage rates and fringe benefits paid must be at the rates to be shown on the certified payroll documents submitted by the Contractor.
7.j.2
Packet Pg. 281 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-24 Project No. C1737-22
ii. Labor Surcharge. The labor surcharge will be set as 30% of the Wages. The labor surcharge will constitute full
compensation for all payments imposed by State or Federal laws and for all other payments made to on behalf of,
workers engaged in the performance of the Work, it includes Workers Compensation Insurance.
b. Materials. Materials costs will be the direct costs for materials estimated to be exhausted, consumed or entering permanently into the Work, plus a fixed markup which, together with the cost of materials as described in this provision will constitute full and complete compensation for all overhead, profit, incidentals, and any and all other direct or indirect expenses associated with furnishing all materials for the Work.
c. Equipment. No payment will be made for use of tools and equipment which have a replacement value of $400.00 or less. Regardless of ownership, the rates to be used in calculating equipment rental costs shall not exceed the listed rates prevailing locally at equipment rental agencies or distributors at the time the work is performed. The listed rates are considered to include the cost for all fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs, and maintenance of any kind, depreciation, storage, insurance, as well as loading and transportation costs for equipment used on the extra work. All equipment shall be acceptable to the Inspector of Record, in good working condition, and suitable for the purpose for which it is to be used. Manufacturer’s ratings and modifications shall be used to classify equipment, and equipment shall be powered by a unit of at least the minimum rating recommended by the manufacturer.
Equipment costs as defined in this provision plus the fixed markup will constitute full and complete compensation for all overhead, profit, incidentals, and any and all other direct or indirect expenses associated with furnishing all equipment for the Work.
d. Markup. Markup for Contractor and Subcontractors shall be calculated as set forth below. Markup includes any and all other cost impacts including, but not limited to profit, overhead, bond premiums and/or fees, insurance premiums and/or fees (other than workers compensation insurance), superintendent labor, field overhead, clerical expenses, home office expenses and overhead, Work site office expenses, utility costs, documentation, travel, time associated costs, meeting and licensing costs. Markup plus labor, material, and equipment will constitute full compensation, and no additional compensation for such cost impacts will be allowed unless approved in writing in advance of performance of the Work.
i. Subcontractor Work: For both extra and deleted work
performed by a Subcontractor, the Subcontractor shall
receive or deduct a 10% markup on all Labor, Materials and Equipment. Contractor shall receive or deduct a 5% markup on the Subcontractors total cost (cost + markup).
ii. Contractor Self Performed Work: For extra work and deleted work self-performed by the Contractor, Contractor shall receive or deduct a 15% markup on all Labor, Materials and Equipment.
7.j.2
Packet Pg. 282 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-25 Project No. C1737-22
4) Force Account Pricing. If Force Account is approved the Change Order total shall be the sum of and limited to the actual direct and indirect costs for labor, materials, equipment, and markup. The calculation method and terms for Fixed Lump Sum Pricing shall apply to this section with the exception of the following:
a. Labor. Shall include the actual number of hours worked per worker per the Inspector of Record signed Time and Materials Tracking Forms.
b. Materials and Equipment. Shall include the actual materials and equipment used, exhausted, consumed or entering permanently into the Work as documented with original receipts and submitted with the Time and Materials Tracking Form.
Deductive Change Order Pricing - Deleted work shall be subject to the calculation methods as set forth in this Section and shall include the cost for all indirect and direct costs for materials, labor, equipment and overhead. In determining the deductive change, Contractors and/or Subcontractors bid pricing or pricing provided in prior change order requests submitted by the Contractor may be used to determine pricing. Contractor shall markup the credit for the deleted work using the same markup percentages and methods as detailed in this Section.
Calculation of Mark Up.
(1) Added Work Performed by Subcontractor
a. Subcontractor’s markup = [(Wages + Fringe) x 1.30 + (Materials +Equipment)] x 10% b. Contractor’s markup = Subcontractor’s Cost in (1) a. x 5% (2) Added Work Self-Performed by Contractor
a. Contractor’s markup = [(Wages + Fringe) x 1.30 + (Materials +Equipment)] x 15% (3) Deleted Work Performed by Subcontractor
a. Subcontractor’s markup = [(Wages + Fringe) x 1.30 + (Materials +Equipment)] x -10% b. Contractor’s markup = Subcontractor’s Cost in (3) a. x -5% (4) Deleted Work Self-Performed by Contractor
a. Contractor’s markup = [(Wages + Fringe) x 1.30 + (Materials +Equipment)] x -15% Force Account Tracking Procedures - Prior to performing Force Account work the Contractor must receive written approval from the City to perform such work. Only work identified in the written authorization from the City shall be subject to additional compensation.
Contractor shall use a City approved Time and Material tracking form to track all expenses. The Time and Material tracking form must be signed by the Inspector of Record daily. The Time and Material tracking form must include both the start time and end time for the work performed.
Failure to obtain the Inspector of Record’s signature shall result in forfeiture of any potential claim. Original receipts and/or invoices shall be provided detailing the costs for all materials.
Receipts and invoices must include a detailed breakdown of the costs for material. Failure to provide original receipts and/or invoices shall result in forfeiture of any potential claim. The Inspector of Record shall be required to verify that the materials being installed match the materials listed on the receipts and/or invoices prior to installation. Tracking work using the Time
7.j.2
Packet Pg. 283 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-26 Project No. C1737-22
and Materials tracking form does not automatically entitle Contractor to payment. Time and Materials may be tracked when the City and the Contractor dispute whether or not specific work should be considered extra work. If the Contractor is successful in proving that the work is in fact extra work, then the Time and Materials tracking forms and receipts will be used to calculate payment. Upon the last day of work on a specific Force Account assignment the Contractor shall indicate on the Time and Materials tracking form that the work has been completed. Contractor shall submit to the City with 45 calendar days of the completion of a specific Force Account assignment a change order request identifying all costs associated with the assignment. Failure to do so shall result in forfeiture of any and all claimable costs associated with the assignment.
Contractor shall schedule Force Account work to occur in the most expeditious and inexpensive way.
5.09 Disputed Work - When the Engineer and Contractor fail to agree as to whether an alteration ordered by the Engineer constitutes a material change or difference in the character of the work, or fail to agree upon the compensation to be allowed for such altered work, the Contractor shall proceed with the altered work and file with the Engineer, within ten (10) working days after receiving direction from the Engineer, a written protest detailing the particulars of the dispute and the amount of additional compensation or time required for the alteration. Failure of the Engineer to recognize a change in the character of work when ordering alterations shall in no way be construed as relieving the Contractor of the Contractor’s duty and responsibility for filing a protest as prescribed above. The City will not consider additional compensation for altered work unless the Contractor files a written protest within ten (10) working days after receiving direction from the Engineer.
If the Contractor has complied with the notification requirements of this sub-section, consideration of payment due shall be made as later determined through claim resolution procedures as set forth in General Provisions, Section 10, “Measurement and Payment”.
Although not to be considered as approval for proceeding under extra work provisions, the Contractor shall keep and furnish records of disputed work in accordance with General Provisions, Section 5.07, “Extra Work”.
7.j.2
Packet Pg. 284 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-27 Project No. C1737-22
SECTION 6 - CONTROL OF MATERIALS
6.01 Materials and Workmanship - All materials, parts and equipment furnished by the Contractor in the work shall be new, high grade, and free from defects. Workmanship shall be in accordance with generally accepted standards. Materials and workmanship shall be subject to the Engineer’s approval.
Materials and workmanship not conforming to the requirements of these specifications shall be considered defective and will be subject to rejection. Defective work or material, whether in place or not, shall be removed immediately from the site at the Contractor’s, expense, when so directed by the Engineer.
If the Contractor fails to replace any defective or damaged work or material after notice from the Engineer, the Engineer may cause such work or materials to be replaced. The replacement expense shall be deducted from the amount to be paid to the Contractor.
Used or secondhand materials, parts and equipment are permissible only if permitted by the Special Provisions.
Specialized material or equipment to be used in the work that is not readily available from material suppliers (such as electroliers, luminaries, signal poles, heads, cable, controllers, pumps, etc.) shall be ordered within five (5) days after award of the contract. Time extensions will not be granted for project delays due to the unavailability of such specialized material and equipment unless the Contractor furnishes the Engineer with documentation of purchase order dates, acceptable reason for delay of delivery, or proof of diligent efforts to obtain said items from alternate sources.
The Contractor shall provide the Engineer with periodic reports to inform the Engineer of any changes in the projected material or equipment delivery dates.
6.02 Protection of Work and Materials - The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the work. Stored materials shall be reasonably accessible for inspection. The Contractor shall also adequately protect new and existing work and equipment for the duration of thecontract.
The Contractor shall not, without the City’s consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the contract.
6.03 Trade Names or Equals – In accordance with Public Contract Code Section 3400, whenever any particular material, process, or equipment is indicated by patent, proprietary or brand name, or by the name of a manufacturer or supplier, such wording is used for the purpose of facilitating its description and shall be deemed to be followed by the words “or equal”.
Because products specified may have a uniqueness that can’t be matched, the Contractor must “bid” the work based upon the products specified. If, during the submittal process, an equivalent product is proposed by the contractor, the contractor shall provide data to show that the product is considered equal. Contractor shall also identify any price differences, which shall be considered as part of the substitution and if accepted, shall result in an appropriate credit or cost to the City by change order should the substitution be made.
Unless otherwise authorized by the Engineer, the proposed substitution must be submitted in sufficient time, before the normal use or installation of the material, process or equipment, for the Engineer to determine the equivalency and for the Contractor to make any required purchases (including delivery).
7.j.2
Packet Pg. 285 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-28 Project No. C1737-22
The Engineer shall be responsible for solely determining whether the material proposed for substitution is equivalent to that specified, and the Engineer’s findings shall be final. If a substitute offered by the Contractor is found to be not equal to the specified material, the Contractor shall furnish and install the specified material.
The specified contract completion time shall not be affected by any circumstances developing from the provisions of this Section.
6.04 Inspection of Materials by City - Unless otherwise specified, inspection may be required at the source for such typical materials and fabricated items as bituminous paving mixtures, structural concrete, metal fabrication, metal casting, welding, concrete pipe manufacture, protective coating application, and similar shop or plant operations.
Standard items of equipment such as electric motors, conveyers, elevators, plumbing fixtures, etc., are subject to inspection at the job site. Special items of equipment such as designed electrical panel boards, large pumps, sewage plant equipment, etc., are subject to inspection at the source, normally only for performance testing. The Special Provisions may specify additional inspection requirements.
6.05 Inspection of Materials by Others - When the City does not elect to make its own inspection at the source, the City may, at its expense, engage an inspector or accredited testing laboratory to inspect the materials, equipment or process. The inspector or representative of the testing laboratory shall judge the materials by the requirements of the plans and specifications. No materials or equipment shall be shipped nor any processing, fabrication or treatment of such materials shall be done without a favorable inspection by the engaged agent. These materials shall be subject to re-inspection at the job-site.
6.06 Tests of Materials - Before incorporation into the work, the Contractor shall submit samples of materials, as the Engineer may require, at no cost to the City. The materials for testing shall be delivered to the place by Contractor, and at the time designated, by the Engineer. Unless otherwise provided by the Special Provisions, all testing shall be performed under the direction of the Engineer, and at no expense to the Contractor.
The Contractor shall notify the City in writing at least fifteen (15) days in advance of any intention to use materials for which tests are specified, to allow sufficient time for the City to perform the tests. The notice shall name the proposed supplier and source of material.
6.07 Certification – The Engineer may waive material testing requirements of the Specifications and accept the manufacturer’s written Certificate of Compliance or test data demonstrating that the materials to be supplied meet the requirements of the specifications. A Certificate of Compliance is acceptable for authorizing the use of steel pipe in sizes less than eighteen (18) inches and vitrified clay, cast iron or ductile iron pipe in all sizes. All materials used on the basis of a Certificate of Compliance may be sampled or tested by the City at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of the responsibility for incorporating materials in the work which conforms to the requirements of the Contract Documents.
6.08 Weighing and Metering Equipment – All scales and metering equipment used for proportioning materials shall be inspected for accuracy and certified within the past twelve (12) months by the State of California Bureau of Weights and Measures, by the County Director or Sealer of Weights and Measures, or by a scale mechanic registered with or licensed by the County, The accuracy of the work by a scale service agency, except as stated herein, shall meet the standards of the California Business and Professions Code and the California Code of Regulations pertaining to weighing devices. A certificate of compliance shall be presented to the Engineer for approval prior to operation, and shall be renewed whenever required by the Engineer at no cost to the City.
7.j.2
Packet Pg. 286 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-29 Project No. C1737-22
All scales shall be arranged so they may be read easily from the operator’s platform or area.
They shall indicate the true net weight without the application of any factor. The figures of the scales shall be clearly legible. Scales shall be accurate to within one-percent (1%) when tested with the plant shut down. Weighing equipment shall be so insulated against vibration or moving of other operating equipment in the plant area such that the error in weighing with the entire plant running will not exceed two-percent (2%) for any setting nor one and one half percent (1.5%) for any batch.
6.09 Calibration of Testing Equipment – Testing equipment, such as but not limited to, pressure gages, metering devices, hydraulic systems, force (load) measuring instruments, and strainmeasuring devices shall be calibrated by a testing agency acceptable to the Engineer at intervals not to exceed twelve (12) months, and following repairs, modification, or relocation of the equipment.
Calibration certificates shall be provided when requested by the Engineer.
7.j.2
Packet Pg. 287 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-30 Project No. C1737-22
SECTION 7 – UTILITIES
7.01 City’s Statutory Obligation - Pursuant to Government Code, Section 4215: “in any contract to which a public agency as defined in Section 4401 is a party, the public agency shall assume the responsibility, between the parties to the contract, for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the site of any construction project that is the subject of the contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids. The contract documents shall include provisions to compensate the Contractor for the costs of location, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy and for equipment on the project necessarily idled during such work. The Contract documents shall include provisions that the Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the public agency or the owner of the utility to provide for removal or relocation of such utility facilities.”
7.02 Contractor’s Obligation to Identify and Protect Subsurface Infrastructure - The Contractor shall locate and protect service laterals, conduits, and appurtenances of any underground facility, the presence of which could be reasonably inferred from the Contract Documents or from the presence of visible facilities such as buildings, meters, and junction boxes, prior to doing any work that may damage any such facilities, or interfere with their service. Where underground main distribution conduits, such as water, gas, sewer, electric power, telephone, or cable television are shown on the plans, the Contractor shall assume that every parcel will be served by a service connection for each type of utility. The Contractor shall comply with all requirements for the protection of underground infrastructure as set forth in Government Code, Sections 4215 through 4216.9.
It shall be the Contractor’s responsibility to complete all work in a manner that satisfies utility company standards, providing if requested, detailed plans prepared by a California Registered Civil Engineer showing necessary temporary support of utilities during coordinated construction work. The Contractor is directed to contact these agencies before submitting bids and to be familiar with their requirements and shall include all costs of this coordination within the proposals bid prices.
The Contractor agrees to assume liability and to hold the City of San Carlos, its officers, and employees harmless from any damages resulting from the existence of underground utilities and structures not reported to the Engineer, not indicated on the public records examined, or located at variance with that reported or shown on records examined.
7.03 Location - The City will search known records and indicate on the plans those utilities, except service connections, which may affect the work. All available information regarding removal, relocation, or disconnection of utilities, or installation of new utilities, will be furnished to prospective bidders before the receipt of bids. The Contractor shall immediately report to the Engineer those utilities omitted from the plans or found substantially at variance with the location shown.
Existing and proposed utilities and improvements are shown in their approximate locations.
Locations may not have been field verified and no guarantee is made as to the accuracy and completeness of the information shown. The fact that any facility is not shown on the plans shall not relieve the Contractor of any responsibility under this Section. It shall be the Contractor’s responsibility to determine the existence and location of utilities shown on the plans, indicated by field locating services, or evidenced by facilities visible in the field. No additional compensation will be allowed for delays incurred as a result of the Contractor’s failure to field verify and/or pothole existing utilities prior to beginning construction. Potholing shall be considered as part of the various contract bid items and no additional compensation will be allowed.
At least three (3) working days prior to commencing work, the Contractor shall request that utility and agencies mark or otherwise indicate the location of their substructures. Contractor shall contact Underground Service Alert (USA) at (800) 642-2444 and the Engineer at least forty-eight (48) hours prior to excavation. The location of utilities as shown on the plans are approximate and are not to be
7.j.2
Packet Pg. 288 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-31 Project No. C1737-22
construed as certainty. It shall be the Contractor’s responsibility to determine the true location and depth of all utilities and service connections affecting or conflicting with the work, prior to the performance of the work. As necessary, the Contractor shall pothole these utilities prior to working in the area to avoid damage to them. Potholing shall be considered as part of the contract bid items, and no separate payment will be made. Contractor shall be familiar with the type, material, age and condition of any utility which may be affected by the work.
7.04 Protection - As necessary or as directed by the Engineer, the Contractor shall field adjust proposed improvements to avoid conflicts with existing improvements. The Contractor shall not interrupt the service function or disturb the supporting base of any utility, without authority from the utility Owner or order from the City.
Where protection is required to ensure support of existing underground, overhead and at-grade utilities (including their associated structures and service connections) as shown on the plans, at the Contractor’s expense such protective measures shall be furnished and placed.. In case of damage, the Contractor, without additional compensation, shall restore utilities to as good of a condition as they were found.
Upon learning of the existence and location of any utility omitted from or shown incorrectly on the plans, the Contractor shall notify the City and be fully responsible for protecting such utility. When authorized by the Engineer, additional protection may be paid by change order, for utilities other than a service connection.
The Contractor shall immediately notify the Engineer and the utility owner when Contractor disturbs, disconnects or damages any utility. If the utility is located substantially as indicated on the plans, the Contractor shall bear the costs of repair or replacement.
When placing concrete around or contiguous to any utility, at the Contractor’s expense, a cushion of expansion joint material, clear opening, sleeve, or other suitable material approved by the Engineer so as to prevent embedment or bonding of the utility with the concrete shall be furnished and installed.
7.05 Shut Down Notification – The City is in-charge of the sewer and storm water collection systems, traffic signals and street lighting system and as such the Contractor shall coordinate shut downs of these utilities and facilities with the City’s Engineer and Public Works Maintenance Department. The Contractor shall also coordinate the shutdown of all other utilities, including, but not limited to water, electricity, gas, communications, or CATV with the corresponding utility owner.
Shut downs of any utility or other facility, when allowed, shall be done only after:
A. The Contractor has coordinated with and notify the Engineer/Utility Owners in writing, at least seventy-two (72) hours in advance of the shut down, and, B. Has properly notified customers (residents, businesses/agencies) emergency response staff, and, C. Has all materials required for the work at the job site prior to requesting a shut off.
Except for scheduled shutdowns and in cases of emergency, the Contractor shall notify all customers and effected parties of a shutdown at least forty-eight (48) hours in advance by writing and four (4) hours in advance by person to allow adequate draw time. Once shut down, the Contractor shall proceed with the work in an expedient manner until the water lines or sewer lines are back in service.
7.06 Removal - Unless otherwise specified, the Contractor shall remove all portions of interfering utilities shown on the plans as ‘abandoned’ or “to be abandoned in place”. Before starting removal operations, the Contractor shall ascertain from the utility Owner whether abandonment is complete. The costs involved in the removal and disposal of utilities to be abandoned shall be considered as part of the contract bid items, and no separate payment will be made.
7.07 Relocation - When feasible, the utilities within the area affected by the work will complete their necessary installations, relocations, repairs, or replacements before commencement of work by the Contractor. When the Contract Documents or plans indicate that a utility is to be relocated, altered or
7.j.2
Packet Pg. 289 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-32 Project No. C1737-22
constructed by others, the City will conduct all negotiations with the utilities and the work will be done at no cost to the Contractor.
Utilities interfering with the permanent project work, discovered after the award of the contract, shall either be relocated, altered, or reconstructed by the utility, or the Engineer may order changes in the work to avoid interference. Such changes will be paid for in accordance with General Provisions, Section 5, “Changes in Work”.
When the plans or specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such work shall be absorbed in the contract bid items. Temporary or permanent relocation or alteration of utilities by the Contractor for convenience shall be theresponsibility of Contractor. Contractor shall make all arrangements, obtain all approvals, and bear all costs. The Contractor may, for convenience or to expedite the work, agree with the owner of any utility to disconnect and reconnect interfering service connections. The City shall not be involved in any such agreement.
7.08 Delays - The Contractor is responsible for notifying utility companies in time to prevent delays attributable to utility relocations or alterations as called for in the Contract Documents. The Contractor shall not be entitled to damages or additional payment if such delay does occur. The Engineer will determine the extent of the delay based on the Baseline Construction Schedule (Section 8.05) and on the project as a whole, and any commensurate extension of time.
7.09 Cooperation - When necessary, the Contractor shall conduct toperations so as to permit access to the worksite and provide time for utility work to be accomplished during the progress of the contract work.
7.j.2
Packet Pg. 290 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-33 Project No. C1737-22
SECTION 8 – PROSECUTION AND PROGRESS
8.01 Notice to Proceed - Within twenty-one (21) calendar days following receipt of the signed agreement, bonds and insurance, the City shall issue the Contractor a Notice to Proceed provided that the documents are acceptable to the City. Unless stated otherwise, the contract time shall commence upon the receipt date on the Notice to Proceed.
8.02 Commencement of Work - Work shall commence within fifteen (15) calendar days following the receipt date on the Notice to Proceed, and shall be diligently prosecuted to completion within the time provided in the Notice to Bidders.
8.03 Subcontracting - Unless otherwise indicated by the Special Provisions, the Contractor shall perform the majority of the project work.
8.04 Administrative Duties - The Contractor shall coordinate the scheduling and timing of administrative duties with other activities to avoid conflicts and to ensure orderly project progress. Such activities include, but shall not be limited to, the preparation of construction schedules, preparation and processing of submittals, requests for information and responding to requests for quotations, attending and preparing for progress meetings and coordinating project closeout activities.
8.05 Baseline Construction Schedule – Within ten (10) calendar days of the Notice to Proceed, the Contractor shall submit to the Engineer an acceptable Critical Path Method (CPM) progress schedule showing the critical path for completing the various items of work within the number of contract days specified. The schedule shall show the order in which the Contractor proposes to carry out the major items of work and the dates on which he will start and finish the various items (including procurement of materials and equipment). If requested, the schedule shall be resource loaded to reflect person/crew hours and equipment loading for various construction activities in order for the City to better evaluate the proposed schedule.
(a) City Review of Schedule – The City may review and note exceptions to the Contractor’s schedule, if it is not sufficiently detailed to clearly show the work to be completed during each month to assure the completion of the work within the project duration. The Contractor will be solely and exclusively responsible for resolving any exceptions, and the City’s review will not create any scheduling obligations of the City. Any noted corrections to the schedule shall be addressed within five (5) working days. (b) Update of Schedule – After submission of a schedule to which the City has taken no exceptions, the Contractor shall submit an updated schedule on a monthly basis or as otherwise specified by the City until completion of the work. The updated schedule must show the “As Constructed” progress up to the date for which the schedule has been prepared and reflect any proposed changes in the method of operations, to achieve the project milestones within the required project duration. (c) Float – The schedule must show early and late completion dates for each task. The number of days between these dates will be designated as “float”. The float will be assigned to the project and available for the City, at the Engineer’s discretion, to allocate the “float” to the Contractor as needed to complete the work in accordance with the agreement.
(d) Failure to Submit Schedule – If the Contractor fails to submit a schedule within the time periods specified in this sub-section, or submits a schedule to which the City has taken uncorrected exceptions, the City may withhold payments to the Contractor until such schedule is submitted and/or corrected in accordance with the Contract Documents.
8.06 Three-Week Look Ahead Schedule - The Contractor is required to furnish to the Engineer, on a weekly basis at the project’s progress meetings, a three-week look ahead schedule. The
7.j.2
Packet Pg. 291 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-34 Project No. C1737-22
schedule must show planned activities in sufficient detail to allow proper monitoring of the planned construction activities.
8.07 Construction Sequence - The Contractor shall prepare and submit at the pre-construction meeting a staging or phasing plan identifying the sequence of construction work and traffic control needed to complete the project. The staging plan shall be subject to review and approval by the Engineer, prior to the start of construction. The goal of the phasing plan will be to minimize impacts to surrounding businesses and residents in the project areas. When required by the Special Provisions or plans, the Contractor shall follow the sequence of operations as set forth therein.
8.08 Recording Existing Conditions - Existing conditions throughout the project site shall be photographed and/or videotaped by the Contractor before starting construction. Recording shall include and show every detail of existing improvements, including the current condition of the curb, gutter, sidewalk, signs, landscaping, streetlights, structures near the project including face of buildings, canopies, shades, fences and any other features within the limits of work. Photos and/or videotape shall be delivered to the Engineer at the pre-construction meeting.
8.09 Preconstruction Conference - The City shall designate a date and time for the preconstruction conference once the contract has been fully executed. At the pre-construction conference, the City shall discuss various administrative procedures and project coordination issues. At a minimum, the Contractor should be prepared to furnish and discuss the following:
(a) Letter designating the Superintendent.
(b) A list of key personnel and emergency contact information including telephone numbers to be used in case of emergency
(c) Sequence or phasing plans identifying the phasing of construction work and any alternative sequences for consideration.
(d) Traffic control plans associated with the staging plans (to be signed and stamped by a Licensed Traffic Engineer).
(e) A draft of the master Baseline Construction Schedule, in Critical Path Method (CPM) format (to be finalized no later than ten (10) days after the Notice to Proceed). (f) A breakdown of lump sum bid items to be used as a basis for determining the value of work completed on future progress payments.
(g) A submittal schedule listing all project submittals that will need to be reviewed and a listing of proposed material suppliers.
(h) Utility company coordination and/or permit issues.
(i) Videotape and/or photography of the project’s existing condition (to be completed prior to starting construction.
(j) Anticipated cash flow projections, if requested by the engineer.
8.10 Progress Meeting - The Contractor, Job Superintendent and Subcontractors, if requested by the City, shall attend weekly progress meetings to be scheduled by the Engineer at a time agreeable to both the Engineer and the Contractor. Contractor shall also attend special meetings in addition to regular progress meetings if necessary and directed by the Engineer.
8.11 Hours of Construction - Construction activities shall be limited to the hours of 8:00 a.m. to 6:00 p.m., unless otherwise noted or further restricted in the Contract Documents, or as directed by the Engineer. No work shall be done on weekends, holidays or outside these specified hours, unless otherwise approved by the Engineer. The Contractor shall take into consideration and coordinate time constraints for special events or activities organized by the City or other agencies. No mechanical equipment, including hauling or deliveries by trucks, shall start before 8:00 a.m. and all equipment must shut down before 6:00 p.m. unless approved by the Engineer.
7.j.2
Packet Pg. 292 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-35 Project No. C1737-22
8.12 Prosecution of Work - To minimize public inconvenience and possible hazards and to restore the streets and other work areas to their original condition and former state of usefulness as soon as practicable, the Contractor shall diligently prosecute the work to completion. If, in the Engineer’s opinion the Contractor fails to prosecute the work to the extent that the above purposes are not being accomplished, the Contractor shall, upon orders from the Engineer, immediately take the steps necessary to fully accomplish said purposes. All costs for prosecuting the work as described herein shall be absorbed in the Contractor’s bid. Should the Contractor fail to take the necessary steps to fully accomplish said purposes, after orders of the Engineer to do so, the Engineer may suspend the work in whole or in part, until the Contractor takes said steps. With or without such suspension, the Engineer may cause such steps to be taken by force account or by other means at the Contractors expense.
8.13 Suspension of Work - Work may be stopped or suspended in whole or in part for up to ninety (90) days when, in the Engineer’s opinion, the suspension is necessary and in the interest of the City. The Contractor shall immediately comply with any written order of the Engineer suspending work.
Such City directed suspension shall be without liability to the Contractor on the part of the City.
Suspended work shall be resumed upon written order of the Engineer. An extension of contract time equal to the period of suspension shall be issued to the Contractor by change order. Any claim by the Contractor for an adjustment of the contract sum or the contract time shall be made within ten (10) working days after the end of the work suspension.
If work is suspended through any fault of the Contractor, all expenses and losses incurred by the Contractor during such suspensions shall be borne by the Contractor. If the Contractor fails to properly provide for public safety, traffic, and protection of the work during periods of suspension, the City may elect to do so, and shall deduct the cost thereof from monies due the Contractor. Such action will not relieve the Contractor from any liability.
8.14 Default by the Contractor and Termination of Control - As a result of any of the following events, the Contractor shall be deemed to be in default:
(a) If the Contractor is in bankruptcy or makes a general assignment for the benefit of creditors, or
(b) If the Contractor fails to make prompt payment to subcontractors for labor or materials, or (c) If a receiver is appointed on account of the Contractor’s insolvency, or (d) If the Contractor fails to provide enough properly skilled workmen or enough materials to insure compliance with the construction time schedule, or (e) If the Contractor fails to perform any portion of the work within the timing requirements of the Contract Documents, or abandons the project site, or (f) If the Contractor disregards instructions from the Engineer or violates any provision of the contract, or
(g) If the Contractor fails to replace or repair any damage caused by the Contractor or its agents, representatives, contractors, subcontractors, or employees in connection with the performance of the work, or
(h) If the Contractor violates any legal requirement related to the work.
In case of default, the City may give written notice to the Contractor and the Contractor’s bonding agent that if the default is not remedied within ten (10) calendar days or the Contractor does not provide adequate written assurance to the satisfaction of the Engineer that the cure will be forthcoming, the Contractor’s control over the work may be terminated as of the date specified in the written notice.
Upon such termination of control the City may enter upon and take possession of the entire work and may also take possession, for the purpose of completing the work, of all of the Contractor’s tools, equipment and appliances upon the work, and all materials on the site or stored off-site for incorporation into the work. The City may, at its sole option and without further notice to anyone, complete the work by
7.j.2
Packet Pg. 293 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-36 Project No. C1737-22
day labor, by contract entered into by negotiations, by competitive bidding, by calling upon the performance of the performance bond surety, or by other means as the City, in its discretion, shall elect.
After termination of the Contractor’s control over the work as herein provided, the Contractor shall not be entitled to any further payments under the contract until the entire work thereunder has been fully completed and finally accepted by the City. After such completion and acceptance, if the “unpaid balance of the contract price” (as defined in the next paragraph) exceeds the sum of the amounts expended by the City in taking over and completing the work, including all managerial and administrative expense incurred by the City on account thereof and the amount of all damages incurred by the City by reason of the Contractor’s default, such excess shall be paid to the Contractor. If the said amount expended exceeds the unpaid balance, the Contractor and the surety shall be liable to the City for the difference. At the Contractor’s request, the expense incurred by the City in taking over and completing the work, and the amount of any damage incurred by the City by reason of the Contractor’s default shall be audited and certified by an independent third party, whose certificate thereof shall be binding and conclusive upon the parties.
For the purposes of the computations required by the paragraph above, the “unpaid balance of the contract price” shall be the original contract price as adjusted by any change orders issued prior to termination of the Contractor’s control, less all payments made on account thereof prior to such termination, and less any and all amounts withheld or paid pursuant to stop notices filed with the City upon claims of subcontractors or others from equipment, labor or materials furnished to the work on behalf of the Contractor.
Upon completion and acceptance of the work, the Contractor shall be entitled to the return of all materials not used in the work, but without claim against the City for loss or damage with respect thereto, and shall be entitled to the return of all the equipment, tools and appliances taken possession of by the City, but without claim against the City for any charge for the use thereof or for usual and ordinary depreciation and wear and tear.
The exercise of remedies provided for in this sub-section, for default by the Contractor, shall be in addition to, and shall not be deemed a waiver by the City of any other rights or remedies due the City under the contract provisions, for default by the Contractor.
8.15 Contractor’s Right to Stop Work or Terminate Contract – The Contractor may give written notice to the Engineer of intention to stop work or terminate the Agreement, or both if the work should be stopped by order of any court or other public authority, through no act, omission or fault of the Contractor or any Subcontractor, agent or employee of the Contractor, and such work stoppage under such order shall continue for thirty (30) consecutive days from the effective date of such order If, after the Contractor provides notice to the City of any of the above defaults, the City does not remedy the default within ten (10) calendar days, the Contractor may stop work and may give the City written notice of contract termination. The Contractor may then recover from the City payment for all work executed to date and any loss sustained upon any equipment or materials procured for the work prior to the work stoppage. No compensation for loss of anticipated profits will be provided, however, on work not completed. The Contractor’s right to recovery shall be subject, however, to the duty of the Contractor to mitigate all loss or damage so far as reasonably possible.
8.16 City’s Right to Terminate Contract – The City may, at its option, terminate the Agreement, in whole or from time to time in part, at any time by giving notice to the Contractor. Upon such termination, the Contractor agrees to waive any claims for damages, including loss of anticipated profits, on account thereof; and, as the sole right and remedy of the Contractor, the City shall pay the Contractor in accordance with this sub-section. Upon termination, the obligations of the Contractor for portions of the work already performed shall continue.
(a) Upon receipt of a Notice of Termination, the Contractor shall, unless the notice directs otherwise, do the following:
7.j.2
Packet Pg. 294 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-37 Project No. C1737-22
1. Immediately discontinue the work to the extent specified in the notice.
2. Place no further orders or subcontracts for materials, equipment, services, or facilities, except as may be necessary to complete such portion of the work that are not to be discontinued.
3. Promptly cancel, on the most favorable terms reasonably possible, all subcontracts to the extent that they relate to the performance of the discontinued portion of the work.
4. Thereafter do only such work as may be necessary to preserve and protect the work already in progress and to protect materials, plants, and equipment on the project site or in transit thereto.
(b) Upon such termination, the City shall pay to the Contractor as a sole and exclusive remedy for the termination, the sum of the following, and the Contractor will be entitled to no other compensation or damages, and expressly waives same:
1. The amount of the contract amount allocated to the portion of the work properly performed by the Contractor as of the date of termination, less sums previously paid to the Contractor, plus
2. Previously unpaid costs of any items delivered to the project site which were fabricated for subsequent incorporation in the work, plus
3. Any proven losses with respect to materials and equipment directly resulting from such termination, plus
4. Reasonable demobilization costs in excess of what would have been incurred if work were not terminated, plus
5. Reasonable costs for preparing a statement of the aforesaid costs, expenses, and losses in connection with such termination.
The City may terminate the Agreement at its own discretion or when conditions encountered during the work make it impossible or impracticable to proceed, or when the City is prevented from proceeding with the Agreement by act of God, by law, or by official action of a public authority.
8.17 Time of Completion and Days Charged - The Contractor shall diligently prosecute and fully complete the work within the number of calendar or working days set forth in the Notice inviting Sealed Proposals or shall be subject to liquidated damages. Time is of the essence in the performance of all obligations under the Contract Documents, and all timing requirements shall be strictly adhered to unless otherwise modified by the City. See General Provisions, Sections 8.12, “Prosecution of Work”, and 8.18, “Liquidated Damages”.
Under a calendar day contract, City observed holidays and inclement weather delays are to be anticipated and unless there is a deviation from what is customary for the time of year the project is under construction, no additional days will be granted. Every day, including holidays, Saturdays and Sundays shall be counted as a day charged under a calendar day contract.
Under a working day contract, the Contractor will be given credit for City observed holidays and inclement weather delays, in accordance with the State Standard Specifications. Should the Contractor prepare to begin work at the regular starting time in the morning of any day on which inclement weather, or the conditions resulting from the weather prevents the work from beginning at the usual starting time and the crew is dismissed as a result thereof and the Contractor does not proceed with at least seventyfive percent (75%) of the normal labor and equipment force engaged in the current controlling operations for at least sixty percent (60%)of the total daily time being currently spent on the controlling operations, the Contractor will not be charged for a working day whether or not conditions should change thereafter.
8.18 Liquidated Damages - The City and the Contractor, by execution of the agreement, each agree that time is of the essence in the performance of the work, and that actual damages for
7.j.2
Packet Pg. 295 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-38 Project No. C1737-22
inconvenience and loss from any delay in completion of the contract beyond the date provided in the Notice to Bidders is extremely difficult or impossible to determine.
The City and the Contractor further agree, as specified in the Notice to Bidders, that liquidated damages shall be assessed for each and every calendar day required to complete the contract in excess of the contract time established for the project, and that the amount stated therein is a reasonable estimate of the amount of such damages. The Engineer may deduct any liquidated damaged owed to the City, as determined by the Engineer from any payments otherwise payable to the Contractor under this agreement.
In addition, the City shall have the right to charge to the Contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, administration and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such delay, except that the cost of final surveys and preparation of the final estimate shall not be included in such charges.
Separate from the above-mentioned liquidated damages, the Contractor shall be responsible for paying all damages incurred by private businesses (residential, commercial or industrial), schools and hospitals due to non-completion of the project by the date specified.
Nothing contained herein shall limit the City’s rights or remedies against Contractor for any default other than failure to complete the work within the contract time. This provision for liquidated damages shall not be applicable nor act as a limitation upon the City if the Contractor abandons the work.
In such event, the Contractor shall be liable to the City for all losses incurred.
The date of the Engineer’s Certificate of Substantial Completion shall be the termination date, if applicable, of liquidated damages.
8.19 Delays and Extensions of Time
(a) Excusable Delays - shall mean delays in the prosecution or completion of the work which result from causes beyond the control of the Contractor and City and which could not have been avoided by the exercise of care, prudence, foresight, and diligence on the part of the Contractor, suppliers, or any tier of the Contractor’s subcontractors. Excusable Delays fall into the following categories:
1. Abnormal Delays – Excusable Delays caused by acts of god, fire, unusual storms, floods, tidal waves, earthquakes, strikes, labor disputes, freight embargoes, and shortages of materials insofar as they prevent the Contractor from proceeding with at least seventy-five percent (75%) of the normal labor and equipment force for at least five (5) hours per day toward completion of the current critical path activity.
2. Weather Delays – Excusable Delays due to inclement weather conditions or the conditions resulting from weather prevent the Contractor from proceeding with seventy-five percent (75%) of the normal labor and equipment force engaged in the current critical activity item for a period of at least five (5) hours per day toward completion of the current critical path activity.
3. Material Shortage Delays – Excusable Delays due to shortages of material, provided that the Contractor submits satisfactory proof to the Engineer. For the proof to be satisfactory, the Contractor must demonstrate that every effort to obtain the materials from all known sources within reasonable reach of the proposed work has been made. Only the physical shortage of material, caused by unusual circumstances, will be considered under these provisions as an excusable delay, and no consideration will be given to any claim that material could not be obtained at a reasonable, practical, or economical price, unless it is shown to the satisfaction of the Engineer that such material was only available at exorbitant prices. A material shortage delay will not be considered for material
7.j.2
Packet Pg. 296 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-39 Project No. C1737-22
ordered or delivered late or for material whose availability is affected by virtue of mishandled procurement. The above provisions shall apply equally to equipment to be installed in the work.
(b) Compensable Delays - shall include delays that occur in the prosecution or completion of the work, through no fault of the Contractor which prevent the Contractor from proceeding with at least seventy-five percent (75%) of the normal labor and equipment force for at least five (5) hours per day toward completion of the current critical activity item(s) on the latest favorably reviewed progress schedule due to the following causes:
1. Delays due solely to the actions and/or inactions of the City.
2. Delays due to changed conditions as defined in General Provisions, Section
5.05, “Requests for Information, Inconsistencies and Changed Conditions”.
3. Delays due to other Contractors employed by the City who interfere with the Contractor's prosecution of the work as defined above.
(c) Inexcusable Delay - means any delay in the completion of the work beyond the expiration of the contract time resulting from causes other than Excusable Delays or Compensable Delays. An Inexcusable Delay shall not entitle the Contractor to an extension of the contract time or an adjustment of the contract sum. In addition to liquidated damages for inexcusable delays, the Contractor agrees to pay the City’s actual costs, including charges for engineering, inspection and administration incurred during the delay. (d) Concurrent Delays - those periods of delay when the prosecution of the work is delayed during the same period of time due to causes from a combination of the delays defined as Excusable, Compensable or Inexcusable.
If the Contractor desires an extension of time, he shall file a written request based upon the delays reported. The Engineer will ascertain the facts, the extent of the delays, and the effect upon the entire project, and the City will grant an extension of time equivalent to verified time lost. The request for an extension of time must be made no later than ten (10) working days after the start of the condition that purportedly caused the delay, and no later than fifteen (15) working days after the date on which performance on the condition purportedly causing the delay has ended.
Contractor may make a delay claim for an extension of the contract time for an Excusable Delay or a Compensable Delay. If an Excusable Delay and a Compensable Delay occur concurrently, the maximum extension of the contract time shall be the number of calendar days from the commencement of the first delay to the cessation of the delay which ends last. If an Inexcusable Delay occurs concurrently with either an Excusable Delay or a Compensable Delay, the maximum extension of the contract time shall be the number of calendar days, if any, by which the Excusable Delay or the Compensable Delay exceeds the Inexcusable Delay.
For a Compensable Delay, the Contractor may make a delay claim for an adjustment in the contract sum in an amount equal to the sum of the actual and unavoidable additional costs of labor, material, and equipment furnished at the site by the Contractor or subcontractors, including wages, salaries, fringe benefits and payroll taxes.
Extensions of time, when granted, will be based upon the effect of delays to the project as a whole and will not be granted for non-controlling delays to minor portions of the work unless it can be shown that such delays did, in fact, delay the progress of the project as a whole. For purposes of determining delays, all float associated with the project schedule shall belong to the project. See General Provisions, Section 8.05, “Baseline Construction Schedule”.
If delays are caused by unforeseen events beyond the control of either the Contractor or the City, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor shall not be entitled to damages or additional payment due to these delays. War, governmental regulations, labor disputes, strikes, fires, floods, adverse weather necessitating cessation of work, other similar action of the elements, inability to obtain materials, equipment, or labor because of Federal Government
7.j.2
Packet Pg. 297 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-40 Project No. C1737-22
restrictions arising out of National Defense, required extra work, action or inaction by the City, or other specific reasons as may be further described in the specifications may constitute such a delay. If delays beyond the Contractor’s control are caused by reasons other than those mentioned above, but are substantially equal in gravity to those enumerated, an extension of time may be granted, if deemed by the Engineer to be in the best interests of the City.
The Contractor shall be entitled to an extension of time if delayed due to a failure of the City to furnish necessary right-of-way or materials which the City agreed to furnish, or by the City’s failure to supply necessary plans or instructions concerning the work, after written request by the Contractor.
For Compensable Delay periods resulting in indirect overhead expenses, the Contractor shall be reimbursed as provided for in General Provisions, Section 5, “Changes in Work”.
8.20 Substantial Completion – When work in accordance with the Contract Documents has progressed to a stage of one-hundred percent (100%) complete, as determined by the Engineer, except for the completion of minor punch list items of deficiencies or omissions in the work which require correction in order to satisfy the agreement, yet do not impair the City’s ability to occupy and fully utilize the work for its intended purpose, the project shall be deemed “Substantially Complete”. Portions of the work may also be designated by the City as substantially complete if the Contract Documents require separate delivery.
When the Engineer determines that the work or such designated portions of the work are substantially complete, the Engineer will prepare and sign a Certificate of Substantial Completion. The date of substantial completion shall establish the date at which days charged against the project duration shall terminate. The date of substantial completion shall also establish the date of occupancy by the City and the transfer of responsibility from the Contractor to the City for such items as security, maintenance, heat, utilities, insurance, and damage to the work from causes other than that of the Contractor. Unless otherwise indicated in the Certificate of Substantial Completion, the Contractor’s guarantee for the work shall commence upon the date of substantial completion. See General Provisions, Section 11.01, “Contractor’s Guarantee”.
8.21 Project Closeout - After the Contractor has received the Certificate of Substantial Completion and has only minor work remaining, project closeout may begin. The following items and procedures are required as part of the project close out process. (a) Following the completion of punch list items, the Contractor shall make a written request to the city to conduct a final inspection. The written request shall be accompanied by a Certification that the work has been performed in accordance with the Contract Documents.
(b) Within fourteen (14) days of receipt of the Contractor's Certificate of Completion, a final inspection will be scheduled and conducted by the City. As a result of the inspection, the City will advise the Contractor of any work that must be completed or corrected before Acceptance, in the form of a punch list.
(c) The City will conduct a re-inspection of the punch list items within when requested by the Contractor, in writing, with assurances that the punch list requirements have been met.
Any charges by a Consulting Engineer/Architect hired by the City to do repeat reinspection of the punch list may be recovered from the Contractor. (d) The contractor shall provide a final payment request with lien releases (if applicable) in a format acceptable to the City.
(e) The as-built drawings and all record documents and shall be provided to the City by the Contractor including but not limited to, equipment operation and maintenance manuals, copies of warranties, shop drawings, product data, etc. Record documents shall be properly identified and organized into binders.
7.j.2
Packet Pg. 298 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-41 Project No. C1737-22
8.22 Final Completion - After the Contractor has received the Certificate of Substantial Completion along with the punch list, and has completed the items identified as necessary for project closeout, the Engineer will make a determination as to if the work is fully completed and in accordance with the Contract Documents. If so, the Engineer will recommend final acceptance to the City Council.
Should it become necessary, due to developed conditions, for the City to occupy any portion of the work, or any part of any structure or equipment, before the contract is completed or accepted, such occupancy shall not constitute an acceptance of any part of the work, unless so stated in writing by the City.
8.23 Final Acceptance – Final acceptance by the Engineer will be considered after the work has been fully completed. A Notice of Completion will be filed with the County Recorder once Final Acceptance has been made.
8.24 Risk of Loss - The Contractor shall be responsible for the charge, care and protection of the project and shall bear all risks of injury or damage to the work, materials or equipment delivered to the site, by any means including fire, earthquake, wind, storm or other action of the elements, vandalism, or loss by theft, from the date of Notice to Proceed to the date of the filing of the Notice of Completion by the Engineer. The Contractor shall rebuild, repair, restore and make good all injuries or damage to any portion of the work, and shall bear the entire expense thereof, except such injuries or damages that are caused by riot, insurrection, acts of the Federal or State Government, or a public enemy in time of war.
8.25 Use of Improvements During Construction - The City reserves the right to take over and utilize all or part of any completed facility or appurtenance. Such action by the City will not relieve the Contractor of responsibility for injury or damage to said completed portions of the improvement resulting from use by public traffic, from the action of the elements or from any other cause attributable to the Contractor’s operations or negligence. The Contractor will be required to restore such portions of the improvement before final acceptance. Nothing in this Section shall be construed as relieving the Contractor from full responsibility for correcting defective work or materials.
7.j.2
Packet Pg. 299 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-42 Project No. C1737-22
SECTION 9 —RESPONSIBILITIES OF THE CONTRACTOR
9.01 Contractor’s Responsibility for the Work - The Contractor shall supervise, coordinate, and direct the work using Contractor’s best skill and attention. Contractor shall have control over and be solely responsible for construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the work in accordance with the terms of the Contract Documents until the completion and final acceptance of the work by the City. The Contractor shall furnish and maintain in good condition all equipment and facilities as required for the proper execution and inspection of the work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.
The Contractor shall rebuild, repair, restore and make good all injuries, damages, re-erections and repairs occasioned or rendered necessary by causes of any nature whatsoever, excepting only acts of God and none other, to all or any portions of the work, excepting as otherwise stipulated.
9.02 Contractor’s Responsibility for Subcontracted Work - The City will deal directly with, and make all payments to the Contractor only. The Contractor shall be responsible for the coordination of all trades, subcontractors, and suppliers engaged upon the work. Neither the City nor the Engineer will undertake to settle any differences between the Contractor and the subcontractors.
All persons engaged in the work, including subcontractors, will be considered as employees of the Contractor. The Contractor will be held responsible for their work and shall be responsible to the City for acts and omissions including those by their respective agents and employees.
When subcontracted work is not prosecuted in a manner satisfactory to the Engineer, the Contractor shall be notified to take corrective action within a specified time. If timely correction is not made, then upon receipt by the Contractor of written instructions from the Engineer, the Subcontractor shall be removed immediately from the work and shall not be reemployed.
9.03 Superintendent - The Contractor shall employ, and provide a written letter designating a superintendent and/or representative and all their contact information. The superintendent and/or representative shall be present on the job site whenever work is in progress to coordinate all work with the City and neighboring property owners, and who shall be available by phone twenty-four (24) hours per day, seven (7) days a week up to the Final Acceptance of the work by the City. A backup representative may also be provided. A joint venture shall designate only one Superintendent.
City approval of the Superintendent is required prior to starting work. The City reserves the right to request an appropriately qualified replacement of the Superintendent any time during construction of the project. Contractor shall provide the Engineer with the Superintendent’s telephone number, along with an after-hours emergency contact number of a responsible person who shall correct hazardous situations, should they occur, during times other than the normal working hours.
Directions and information given to the Superintendent shall be considered as having the same effect as if delivered to the Contractor and the Superintendent shall have full authority to execute the same and to supply materials, tools and labor without delay, and who shall be the legally appointed representative of the contractor. Contractor shall be liable for the faithful observation of any instructions delivered to Contractor’s duly appointed representatives.
9.04 Character of Workers - Contractor shall provide competent, fully qualified personnel to perform the work and shall at all times maintain good discipline and order among its employees and Subcontractors. Any employed person or Subcontractor who is found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable or who fails or refuses to perform the work properly and acceptably, shall be immediately removed from the work by the Contractor and shall not be reemployed. Such discharge shall not be the basis of any claim for compensation or damages against the City of San Carlos or any of its officers, employees or agents.
7.j.2
Packet Pg. 300 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-43 Project No. C1737-22
9.05 Laws to be Observed - The Contractor shall be fully informed of, and at all times observe and comply with all Federal, State and County laws, including those of CAL-OSHA; all municipal ordinances and regulations of the City of San Carlos; and all orders and decrees of bodies having jurisdiction over the work. The Contractor shall also cause all agents and employees engaged on the project to observe and comply with all such laws, and shall protect and indemnify the City of San Carlos and all officers, employees, and agents thereof connected with the work against any claim or liability arising from or based on the violation of any such law
(a) Non-Discrimination – Attention is directed to Labor Code, Section 1735 which reads as follows: “No discrimination shall be made in the employment of persons upon public work because of the race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status or sex of such persons, except as provided in Government Code, Section 12940 and every Contractor for public works violating this Section is subject to all the penalties imposed for a violation of this chapter.” (b) Alien Labor - The Contractor shall forfeit as penalty to the City of San Carlos fifty dollars ($50.00) for each alien with no permit to work in the United States of America (USA) knowingly employed in the contract, by Contractor or by any hired Subcontractor upon any of the work herein mentioned, for each calendar day, or portion thereof, during which such alien is permitted or required to labor in violation of the provisions of the Labor Code and in particular Sections 1850 to 1854 thereof, inclusive. (a) Hours of Labor – Hours of labor shall be pursuant to Labor Code, Sections 1810.
Pursuant to Labor Code, Sections 1813, Contractor shall forfeit to the City, as a penalty, twenty-five dollars ($25.00) for each worker employed in the execution of this Agreement by Contractor, or any Subcontractor in violation of the terms of this Section or in violation of the provision of any law of the State of California. Such forfeiture amounts may be deducted from the contract sum. Contractor and each Subcontractor shall keep, or cause to be kept, an accurate record showing the actual hours worked each calendar day and each calendar week by each worker employed on the project, which record shall be kept open at all reasonable hours to the inspection of the City, its officers and agents, and to the inspection of the appropriate enforcement agency of the State of California. (d) Prevailing Wage – As identified in the Notice to Bidders, the work contemplated by this agreement is a public work subject to prevailing wages under California Labor Code, Sections 1720 et. seq. The State of California Department of Industrial Relations has ascertained the general prevailing per diem wage rates in the locality in which the work is to be performed for each craft, classification, or type of worker required to perform the work. A schedule of the most recent general prevailing per diem wage rates made available to the City will be on file at the City’s principal facility office and will be made available to any interested party upon request. This prevailing wage rate schedule is provided by the City for Bidder’s information only and is not guaranteed by the City to be current. Contractor is obligated to verify all appropriate prevailing wage rates and pay those rates as required. By this reference the verified current schedule of prevailing wage rates is made part of the Contract Documents. Contractor shall pay not less than the prevailing per diem wage rates, as specified in the schedule and any amendments thereto, to all workers employed by Contractor in the execution of the work. Contractor shall cause all subcontracts to include the provision that all Subcontractors shall pay not less than the specified prevailing per diem wage rates to all workers employed by such Subcontractors in the execution of the work.
Contractor shall forfeit to the City, as a penalty, no more than fifty-dollars ($50.00) for each calendar day or portion thereof for each worker that is paid less than the specified prevailing per diem wage rates for the work or craft in which the worker is employed for any portion of the work done by Contractor or any Subcontractor in violation of the provisions of the Labor Code, and in particular Sections 1770 to 1781 thereof, inclusive.
Such forfeiture amounts may be deducted from the contract sum. Contractor shall also pay to any worker who was paid less than the specified prevailing per diem wage rate for the work or craft for which the worker was employed for any portion of the work, for each
7.j.2
Packet Pg. 301 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-44 Project No. C1737-22
calendar day, or portion thereof, for which the worker was paid less than the specified prevailing per diem wage rate, an amount equal to the difference between the specified prevailing per diem wage rate and the amount which was paid to the worker.
The City will not recognize any claim for additional compensation because of the payment by the Contractor for any wage rate in excess of prevailing wage rates set forth in the Agreement, including payment in excess of the prevailing wage for extra work paid by force account. The possibility of wage increases is one of the elements to be considered by the Contractor in determining the Contractor’s bid and will not, under any circumstances be considered as the basis of a claim against the City under the Agreement.
(e) Payroll Records - Pursuant to Labor Code, Sections 1776, Contractor and all Subcontractors shall keep an accurate payroll record, showing the name, address, social security number, job classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in connection with the work. All payroll records shall be certified as being true and correct by Contractor or Subcontractors keeping such records; and the payroll records shall be provided to the City no later than three weeks after closing of payroll. The Contractor and all Subcontractors must also furnish electronic certified payroll records to the Labor Commisioner of the State of California, Department of Industrial Relations.
(f) Apprentice Program - Attention is directed to State of California Labor Code, Sections 3095, 1777.5, 1777.6, and 1777.7 and Title 8, California Code of Regulations, Section 200, and the applicable Sections that follow. Responsibility for compliance with these requirements lies with the Contractor. To ensure compliance and complete understanding of the law requiring apprentices, and specifically the required ratio thereunder, Contractor or Subcontractors should, where some question exists, contact the Division of Apprenticeship Standards, 425 Golden Gate Avenue, 4th Floor, San Francisco, California, 94102 or one of its branch offices prior to commencement of the work. In the event Contractor willfully fails to comply with this Section, it will be considered in violation of the requirements of the Contract.
Nothing contained herein shall be considered or interpreted as prohibiting or preventing the hiring by Contractor or Subcontractors of journeyworker trainees who may receive onthe-job training to enable them to achieve journeyworker status in any craft or trade under standards other than those set forth for apprentices.
(g) Safety Program – the Contractor shall conform to the rules and regulations pertaining to safety established by the California Division of Industrial Safety and to all requirements as set forth in the State of California Construction Safety Orders (CAL-OSHA), and in particular, Article 3 of these Safety Orders, regarding Accident Prevention and safety meetings. Within ten (10) working days following the Notice of Award the Contractor shall provide a copy of the Contractor’s Safety Plan. The price paid for the plan is included in the various contract items of work and no additional compensation will be made therefore.
9.06 Permits and Fees – Unless otherwise stated in the Special Provisions, the Contractor shall procure all permits, registrations and licenses, including a City business registration, pay all charges and fees, and give all notices necessary for lawful prosecution of the work. All permits, registrations, licenses, and other authorizations shall be secured in sufficient time to prevent delays to the work. The Contractor shall comply with the provisions of said permits, licenses and other authorizations. The contractor shall submit satisfactory proof to the City, prior to issuance of the Notice to Proceed, that such permits, registrations or licenses are and will be in effect throughout the entire life of this contract. The contractor shall keep all permits, registrations and licenses posted on the job site.
7.j.2
Packet Pg. 302 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-45 Project No. C1737-22
For City Capital Improvement Construction Projects, the Contractor shall obtain a “No Fee” encroachment and/or building permit. Contractor shall coordinate through the Engineer to insure that all appropriate construction inspections occur.
9.07 Coordination and Cooperation - Construction work by utility companies or other Contractors may be needed or may be occurring simultaneously within or adjacent to the limits of work for this project. The Contractor shall coordinate and cooperate with all other Contractors and utility companies throughout the duration of this project to avoid delays and minimize interference and conflicts. Cooperation will be required in the arrangement for the storage of materials, and in the detailed execution of the work.
It is the Contractor’s responsibility to ascertain the nature of work by others, coordinate the work, and install, modify, and maintain traffic control as necessary to avoid interferences and delays on the construction activities. Failure of the Contractor to keep informed of the work progressing on the site and failure to give written notice of lack of progress or defective workmanship by others shall be construed as acceptance by the Contractor of the status of the work as being satisfactory for proper coordination with Contractor’s work.
Where the work of one trade joins or is on the other’s work, there shall be no lack of continuity or discrepancy when work is completed. In conforming one kind of work with another, marring or damaging other work will not be permitted. Should improper work of any trade be covered by another which results in damage or defects, the whole work affected shall be made good by the Contractor without expense to the City.
The City reserves the right to perform work or allow others to perform work, as necessary, within or adjacent to the limits of this project, at any time. If the Contractor or any of the Subcontractors or employees causes loss or damage to any separate Contractor on the work, the Contractor, by agreement or arbitration, if they deems it necessary, will settle any claim for such loss or damage. If such separate Contractor shall sue the City, on account of any loss so sustained, the City shall notify the Contractor, who shall indemnify and hold harmless the City against any loss or damage arising therefrom, including the cost and expense of defending any such suit.
If any portions of the work specified herein are to be installed in any right-of–way owned by the State, County, Municipality, or other public entities or public utilities, it shall be incumbent upon the contractor to familiarize described above will necessarily be subject to their inspection and approval before acceptance of these portions of the work by the Engineer. Any costs for inspection by agents other than those of the City shall be borne by the contractor. Where other agencies have jurisdiction over some portion of the work, and the requirements of the agencies are at variance with this specification, then that portion of the work shall be done in accordance with the requirements of the agency(ies).
The Contractor shall absorb in the bid all costs involved in coordinating the work with others. The Contractor will not be entitled to additional compensation from the City for damages resulting from such simultaneous, collateral and essential work.
9.08 Use of Premises - The Contractor shall confine construction activities to the project limits; which shall consist of right-of-way, easements and/or property owned by the City of San Carlos. With prior approval of the Engineer, adjacent street right-of-way may also be utilized for day-to-day operations.
Unless approved by the Engineer, no storage of materials and equipment will be allowed to remain within the right-of-way during non-working hours, on the weekends, or during holidays.
Each day, after the completion of construction operations, unless otherwise approved by the Engineer, the project limits shall be secured and made accessible to the public. All excess materials and equipment not protected by approved traffic control devices (such as k-rails) shall be relocated to a staging area or demobilized. Trench spoils shall be off-hauled daily and open excavations shall be protected with steel plates.
Personnel of Contractor and Subcontractors shall not occupy, live upon, or otherwise make use of the project site during any time that work is not being performed at the project site, except as otherwise provided for in the Contract Documents for issues such as site security.
7.j.2
Packet Pg. 303 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-46 Project No. C1737-22
9.09 Construction Staging and Field Office - If additional space beyond the construction limits is necessary for staging, the Contractor shall, make special arrangements with neighboring property City(s) to secure a staging area for a field office and/or material and equipment storage, at Contractor’s expense. The staging area must be fenced, with screening, and shall be operated in a manner that minimizes the inconvenience to neighbors.
The Contractor is encouraged to negotiate side agreements with the property owners of such sites prior to submitting bids. Prior to occupying the staging area, the Contractor will be required to provide to the Engineer a copy of the agreement or temporary construction easement granted by the property owner. A written release from the property owners or City, holding the City harmless from liability, will also need to be provided. In addition to approval from the property owners, the Contractor may also need to secure a Use Permit from the City’s Planning Division.
9.10 Site Security - Contractor shall be responsible for the care and custody of work and the site, including all necessary security provisions, on a 24-hour per day basis throughout the entire term of the Agreement. The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the work.
9.11 Construction Water – The Contractor is responsible for obtaining all water required for the project and shall work with, and obtain all permits from, the appropriate water purveyor prior to obtaining construction water. If hydrant water is to be used, the Contractor must first obtain a hydrant meter and pay all related expenses. Direct connections to hydrants without a meter are not allowed. If water trucks are used, they shall be installed with backflow prevention devices. The cost of water, including all associated fees, deposits or permits shall be incorporated into the various bid items and no separate payment shall be made. Water purveyors include:
California Water Service Company Mid-Peninsula Water District Bayshore District - Customer Center 3 Dairy Lane
341 North Delaware St. P.O. Box 129
San Mateo, CA 94401-1727 Belmont, CA 94002
M-F: 8 a.m. to 4:30 p.m. M-F: 8 a.m. to 4:30 p.m.
Tel.: (650) 558-7800 Tel.: (650) 591-8941
[email protected] midpeninsulawater.org
9.12 Project Site Maintenance – All work identified in this section shall be considered as part of the contract bid items, and no separate payment will be made thereof. (a) Disposal of Material - Unless otherwise shown on the plans or specified herein, all excess materials and materials removed from existing improvements shall become the property of, and be disposed by the Contractor. The Contractor shall be responsible for all costs associated with disposing all excess materials in a safe and legal manner. No material shall be placed on private or public property without prior approval from the City and the property owner. The Contractor shall not allow any refuse, excavated material, surplus concrete or mortar, or any associated washings, to be disposed upon paved streets, into manholes or into the City’s storm drain system.
Contractor shall establish a system for daily collection and disposal of waste materials from construction areas and elsewhere on the site. Contractor shall handle waste materials that are hazardous, dangerous, or unsanitary separately from inert waste by containerizing appropriately. Burning or burying of waste materials on site will not be permitted.
All materials removed from the existing improvements, which in the opinion of the Engineer have salvage value, shall be delivered to the City Corporation Yard at 1000 Bransten Road, San Carlos, or at any other site designated by the Engineer within the City and shall be considered as part of the contract bid items, with no separate payment will be made thereof.
7.j.2
Packet Pg. 304 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-47 Project No. C1737-22
(b) Cleanup and Dust Control – at all times during construction, including weekends and holidays, and throughout all phases of construction, including work suspensions and until final acceptance of the project, the Contractor shall keep the work site clean and free from rubbish, debris, and prevent the formation of an airborne dust nuisance.
Materials and equipment shall be removed from the site as soon as they are no longer necessary. Upon completion of the work and before final inspection, the entire site shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance.
The Contractor shall abate dust nuisance by cleaning, sweeping, and sprinkling with water, those excavated areas of dirt or other materials which are prone to causing dust, within both the project site and the storage or staging area. If required or directed by the Engineer, the Contractor shall provide an approved water truck of large capacity with spraying capability and/or street sweeper.
The Contractor shall be required to apply water for dust control immediately during construction efforts and within one (1) hour after notification by the Engineer that an airborne nuisance exists. If dust control is not adequate, in the opinion of the Engineer, the Engineer will have this work performed by others and will deduct such cost from the total contract price.
All hauling trucks or other construction vehicles leaving the site shall be cleaned of mud or dirt clinging to exterior body surfaces or wheel rims before traveling on City streets outside the work limits. All trucks coming to or leaving the site with materials or loose debris shall be loaded in a manner, which will prevent the dropping of materials or debris on City streets. Spillage resulting from hauling operations along or across any public traveled way shall be removed immediately.
When construction operations cause dirt to be deposited on public streets, the Contractor shall immediately remove such material. Streets shall be cleaned by street sweeping, rather than flushing, so as to prevent mud from entering the storm drain system.
Excess excavated material shall be removed from the site immediately. Sufficient material may remain for use as backfill if permitted by the specifications. Forms and form lumber shall be removed from the site as soon as practicable after stripping.
Failure of the Contractor to comply with the Engineer’s cleanup orders may result in an order to suspend work until the condition is corrected. No additional compensation will be allowed as a result of such suspension.
(c) Air Pollution Control - The Contractor shall not discharge smoke, dust, or any other air contaminants into the atmosphere in such quantity as will violate the regulations of any legally constituted authority.
(d) Noise Control - The Contractor shall make every reasonable effort to control noise generated as a result of construction to the satisfaction of the Engineer. Use of an air compressor, jackhammer or other loud, vibrating sound generating device shall be limited to operations between the hours of 8:00 a.m. and 6:00 p.m. Monday thru Friday and between 9:00 a.m. to 5:00 p.m. on Saturday and Sunday, unless otherwise authorized by the Engineer.
(e) Vermin Control - At the time of acceptance, structures entirely constructed under the contract shall be free of rodents, insects, vermin and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the contract work within the contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations.
(f) Sanitation - The Contractor shall provide and maintain enclosed toilets for the use of employees engaged in the work. These accommodations shall be maintained in a neat
7.j.2
Packet Pg. 305 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-48 Project No. C1737-22
and sanitary condition. They shall also comply with all applicable laws, ordinances and regulations pertaining to the public health and sanitation of dwellings and camps. (g) Wastewater - Wastewater systems shall not be interrupted. Should the Contractor disrupt existing sewer facilities, the Contractor shall immediately notify the Engineer, and the Contractor shall establish a plan, subject to the approval of the City, to convey the sewage in closed conduits and disposed of it back into the sanitary sewer system.
Sewage shall not be permitted to flow in trenches or be covered by backfill. (h) Temporary Light, Power and Water - The Contractor shall furnish, install, maintain, and remove all temporary light, power, and water, including piping, wiring, lamps, and other equipment, necessary for the work at Contractor’s expense. The Contractor shall not draw water from any water source, except to extinguish a fire, without first obtaining permission from the appropriate water utility company/agency. (i) Storm Water Pollution Control – All work shall conform to the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009- DWQ, NPDES No. CAS000002) ("General Permit"), and the NPDES Municipal Regional Stormwater Permit (MRP) (Order No. R2-2015-0049, NPDES No. CAS612008). The Contractor shall implement all applicable San Mateo Countywide Water Pollution Prevention Program (SMCWPPP) measures and Best Management Practices (BMPs).
Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations and/or a stop work order.
The Contractor shall submit to the City a Stormwater Pollution Prevention Plan (SWPPP) or Water Pollution Control Plan (WPCP), prepared in compliance with all NPDES requirements. The SWPPP/WPCP prepared by the Contractor shall address how the Contractor will prevent materials from being rinsed or washed into the storm drain system and specify which BMPs will be implemented for preventing sediment and pollutant discharges into the storm water system. The Contractor shall provide for the construction of facilities which may be required to prevent, control, and abate water pollution.
All construction efforts shall be conducted in a manner which prevents the release of hazardous material or hazardous waste into the soil or groundwater, and minimizes the discharge of pollutants into the storm drain system. No pollutants will be allowed to enter the storm drainage system. The Contractor shall be responsible for containing and removing any waste from the Contractor’s construction operations using the appropriate BMP. The Contractor shall be responsible for cleaning catch basins of solid or liquid waste materials originating from the Contractor’s operation before this material migrates further into the storm drain system. Violation of this provision shall cause the City to issue a stop-work notice and take necessary action to require the Contractor to correct and comply with regulations. All costs related to the stop-work action and corrective work to come into compliance shall be fully borne by the Contractor.
Existing Drainage Conditions - If the work performed interferes with established drainage patterns, ample provisions shall be made by the Contractor to correct the interference.
The City may also direct the Contractor to take additional measures to be performed at the Contractor 's expense.
Illicit Discharge - No dumping or discharge of construction materials, debris, and hazardous materials will be permitted into the City's storm drainage system. In the event of any discharge, leakage, spill or emission of hazardous materials, Contractor shall promptly notify the City and shall clean all affected property. The Contractor shall indemnify, hold harmless and defend the City against all liability incurred as a result of any such discharge, leakage, spill or emission, regardless of whether such liability, cost or expense arises during or after the term of the permit.
7.j.2
Packet Pg. 306 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-49 Project No. C1737-22
9.13 Preservation of Property - The Contractor shall be responsible for the protection of public and private property adjacent to the work.
Due care shall be exercised to avoid damage to existing roadway improvements and facilities, adjacent property, roadside trees, lawn and shrubbery not designated for removal, pole lines, fences, signs, survey markers and monuments, buildings and structures, conduits, pipe lines under or above ground, sewer and water laterals, and any other improvements or facilities within or outside the limits of construction. As ordered and approved by the Engineer, the Contractor shall provide and install suitable safeguards to protect such objects from injury or damage. If such objects are injured or damaged by reason of the Contractor’s operations, they shall be replaced or restored, at the Contractor’s expense, to a condition as good as when the Contractor entered upon the work, or as good as required by the Contract Documents.
Existing striping damaged during construction within and adjacent to the project site shall be replaced with thermoplastic. Partially damaged striping (such as what might occur trenching through a pavement legend), shall be replaced in their entirety.
Contractor shall preserve carefully bench marks, reference points, and stakes; in case of willful or careless destruction, will be charged with the resulting expense of replacement and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance.
Any survey monuments that are damaged or removed as part of the construction shall be replaced by the Contractor and a Record of Survey, as required by State law, shall be filed by a licensed Land Surveyor at the Contractor's expense.
The fact that any such improvement or facility is not shown upon the plans shall not relieve the Contractor of responsibility under this Section. It shall be the Contractor’s responsibility to ascertain the existence of any underground improvements or facilities indicated on the plans, indicated by locating services, or as evidenced by facilities visible in the field.
Contractor shall protect the work, supplies and materials from damage due to the nature of the work, the action of the elements, trespassers, or any cause whatsoever which is under Contractor’s control, until the completion and acceptance of the work. Neither the City nor any of the City's agents assume any responsibility for collecting indemnity from any person(s) causing damage to the work of the contractor.
9.14 Protection of Buried Utilities – When the Contractor's attention is directed to the existence of pipes, cables, culverts, and other underground structures and improvements which may or may not be shown on the plans, it is the responsibility of the contractor to ascertain the exact location of such underground utilities in advance of any digging operations so that they shall not be disturbed or damaged by the Contractor during the progress of the work. All expenses of whatever nature arising from such disturbance or replacement or repair thereof shall be borne by the contractor.
If the location of pipelines being installed by the contractor under this contract conflicts with the location of existing pipelines, contractor shall so notify the Engineer in writing. The Engineer will ascertain the location of the existing utility in question and may reuire relocatation of the pipeline being installed for the convenience of the Contractor. It shall not be construed that the City or the Engineer is in any way required or obligated to locate or relocate pipelines to locations other than shown on the contract plans. If the Engineer relocates pipelines at the request of the contractor, the contractor shall bear all the expenses incurred in connection therewith.
9.15 Protection of Bridges - Contractor shall be responsible for any damage they may cause to bridges, culverts and road structures. The Contractor shall determine in advance the allowable safe load for each structure and, if necessary, provide special shoring and support at Contractor’s expense.
7.j.2
Packet Pg. 307 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-50 Project No. C1737-22
9.16 Protection of Traffic Signal Facilities - The Contractor shall give at least seventy-two (72) hours advance notice to the Engineer before commencing any street work (such as pavement grinding or trenching) that may potentially damage any traffic signal detection loop wires or any other signal facility.
This requirement is in addition to any Underground Services Alert notifications. The City will then mark the underground traffic signal facilities.
The Contractor shall not proceed with any grinding, trenching or other underground work until it has been verified with the Inspector that signal facilities have been marked.
In the event that the Contractor's construction activities cause any failure of a traffic facility, it shall be repaired and be made fully operable within 24-hours of the damage occurring. In the event that such repair is not undertaken within this time limit, the City may repair the facility at the Contractor’s expense.
9.17 Restoration of Adjacent and Existing Improvements - Contractor shall do all cutting, fitting, or patching of the work required to make all parts of the work come together properly with existing and adjacent conditions.
Unless otherwise provided, the Contractor shall repair or replace all existing improvements (e.g., curbs, sidewalks, driveways, fences, signs, utilities, street surfaces, structures, etc.) damaged or removed as a result of the Contract operations. Repairs and replacements shall be at least equal to existing improvements, and shall match in terms of condition, finish and dimension to the satisfaction of the Engineer.
All Underground Services Alert (USA) markings, including the initial markings made by the Contractor and those markings placed by others in responseshall be removed at the Contractor’s expense when they are no longer required. Acceptable means of removal include sand blasting, high pressure washing, or other means approved by the Engineer.
All traffic signs and street signs within the limit of work necessarily removed during the various phases of operations shall be temporarily reset by the Contractor at or near the original location upon completion of each phase of construction operations. Prior to removal of all traffic control signs, the Contractor shall submit photographs of the site which show the existing location of these signs so that upon completion the photographs will aid in resetting the signs at or near their original location. Traffic control signs and street signs will be replaced upon completion of the work and the cost of removal and replacement shall be considered as part of the contract bid items, and no separate payment will be made thereof.
Rural type mail boxes shall be maintained by the Contractor in a manner satisfactory to the property owner and postal service, and the Contractor shall relocate the same as soon as possible to a permanent location in accordance with postal regulations and in a location acceptable to the property owner.
Any object to be removed and reused at other locations shall be removed with due care and delivered or stored at the project’s construction storage area, or if approved by the Engineer, at any other site designated by the Engineer within the City. Such objects may consist of street light poles, signal mast arms and other objects directed by the Engineer. Items not approved by the Engineer for reuse purposes, and without salvage value, shall become the property of the Contractor, to be disposed of at Contractor expense, in an acceptable manner.
9.18 Archeological Remains - If human and/or archeological remains are uncovered during excavation. All earthwork within one-hundred (100) feet of these materials will be stopped until a Coroner and/or professional archeologist (SCA) and/or the Society of Professional Archeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures.
9.19 Access to Private Property - The Contractor shall schedule and perform operations so as to minimize disruption of access to private property. Prior to blocking access to any private driveway or
7.j.2
Packet Pg. 308 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-51 Project No. C1737-22
parking lot entrance, the Contractor shall notify the residents, business owners or tenants of pending closure and allow residents to remove vehicles. During non-working hours no driveway, house or parking lot shall be denied access to a public roadway.
The Contractor shall coordinate with the adjacent property owners and businesses and maintain vehicle and pedestrian access to their properties at all times. Temporary access ramps, fencing, or other measures shall be provided as needed.
9.20 Traffic Control and Public Convenience – The Contractor shall provide for safe movement of all vehicular, bicycle and pedestrian traffic through and around the construction operations with as little inconvenience and delay as possible. The Contractor shall have no amount of work under construction other than what he can properly prosecute with due regard to the rights and convenience of the public.
Proper conveyance of vehicular traffic and pedestrians through the work area depends upon navigating under unexpected situations. The means of clarifying such conditions to the public include the Contractor’s use of signs, flagmen, pavement markings, barricades, lights, cones and delineators. No one standard sequence of signs or control devices will suit all conditions which may result from construction operations. Even for the same work, the conditions may vary from hour to hour, requiring adjustment and revisions of the traffic control in effect. The traffic control requirements specified herein are therefore intended to establish general principles to be observed in the control and regulation of traffic through and around the construction operations anticipated for this project. The requirements set forth in this Section represent the minimum traffic control requirements imposed and the Contractor shall be solely responsible for providing the full extent of traffic control measures that are necessary. Only individuals trained in the principles of implementing traffic control and/or traffic control flagging shall be assigned that responsibility at the work site.
(a) Traffic Control Plan – The Contractor shall submit a Traffic Control Plan to clearly describe proposed traffic control measures. The plan shall be generally in accordance with the illustrations included in the “California Manual of Uniform Traffic Control Devices” and the “Work Area Traffic Control Handbook”, (Building News Incorporated P.O. Box 3031, Terminal Annex, Los Angeles, CA 90051). The submittal shall consist of scaled drawings for each situation anticipated to be encountered, i.e., intersections, mid-block (each during working and non-working hours), etc. The drawings shall show signs, traffic control devices and flagmen as required.
The Traffic Control Plan shall be directed equally to the regulation and protection of nonvehicular traffic including pedestrians, bicyclists, joggers, skaters, skateboarders, etc.
The Contractor shall provide for the protection and separation of non-vehicular traffic from construction operations at all times. No work involving the implementation of traffic control shall begin until the Engineer has reviewed and has no exception to the traffic control plans. The Contractor may implement a revised Traffic Control Plan only with subsequent review with no exceptions by the Engineer.
(b) Traffic Control Devices - Traffic control devices shall be provided in sufficient quantities and types as required to provide safe and adequate traffic control. During hours of darkness, approved lights and/or flares shall be included, in proper working order, to illuminate signs and hazards and alert approaching traffic. Barricades shall be furnished and maintained along all open trenches in contact with traffic. No work may begin on any day or at any time before traffic control devices have been placed, test driven and, if required, adjusted and revised. All traffic control devices shall be placed in accordance with the Manual of Uniform Traffic Control Devices and the Contractor’s favorably reviewed traffic control plans. Locations of devices shall be adjusted to suit the conditions and circumstances of each detour situation. In all cases, signs shall be placed to most effectively convey their messages to approaching traffic.
The Contractor shall maintain all traffic control devices, at proper locations and in proper working order, at all times during construction operations and whenever a hazard resulting from Contractor’s operations exists. The Contractor shall adjust and revise traffic control devices, placement, etc., to suit changing conditions around construction
7.j.2
Packet Pg. 309 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-52 Project No. C1737-22
operations. Traffic control devices shall remain in place at all times, as required to alert approaching traffic of upcoming hazards. After hazards have been removed, all traffic control devices shall be removed. Temporary signs shall be removed or their messages covered.
Daily traffic control measures shall continue until cleanup activities have been satisfactorily completed and all of the Contractor’s equipment has been removed from the traveled way.
(c) Traffic Control Detours - The Contractor shall direct, divert and detour traffic through, around and adjacent to construction operations in accordance with the traffic control plans specified in the Contract Documents or in accordance with the Contractor’s favorably reviewed traffic control plans.
1. Field Review of Detours - Immediately after traffic control devices have been placed, the detour shall be test driven by the Engineer or Inspector and the Contractor’s Superintendent. The test drive shall include approaches to the detour from each possible direction, and traverse the full length of each detour route. The Contractor shall adjust and revise all traffic control devices as determined to be required by the test drive and the test drive shall be repeated, if determined necessary by the Engineer or Inspector. The Contractor shall provide additional traffic control devices as required to maintain the flow of traffic throughout construction operation.
2. Diverting Bicycle and Pedestrian Traffic – Whenever construction operations obstruct the flow of bicycle and pedestrian traffic or present a hazard to bicycles and pedestrians, the Contractor shall take appropriate action to protect and separate bicycles and pedestrians from the work area. Such action may include placement of barricades between bicycles and pedestrians and the work areas, placement of warning signs, and provisions utilizing personnel as required to protect and maintain access for bicycles and pedestrians as conditions warrant.
3. Diverting Vehicular Traffic - Whenever construction operations obstruct the flow of vehicular traffic or present a hazard to vehicles operating in the vicinity of construction operations, the Contractor shall take appropriate action to warn, detour and otherwise protect approaching drivers and vehicles.
4. Flagmen - The Contractor shall employ flagmen as required for each specific detour and at all locations where barricades and warning signs cannot control the movement of traffic. A warning sign shall be placed ahead of the flagman reading: “Flagman Ahead.” The distance between the sign and the flagman should be based on the average traffic speed, allowing approximately fifty (50) feet for each ten (10) miles per hour. During hours of darkness, flagman stations shall be illuminated such that the flagman will be clearly visible to approaching traffic. Lights for illuminating the flagman station shall receive favorable review by the Engineer. The flagman shall wear a red or orange warning garment when flagging. Flagmen shall be provided with approved red flags or STOP/SLOW hand paddles, and two-way radios for communication. When flagging during hours of darkness, the flagman shall signal with a red light or flare and shall have a belt and suspender harness outside any garments fitted with reflectors or made from reflectorized cloth, unless the garment is well reflectorized in one of these ways.
5. Notice to Agencies - The Contractor shall notify the Engineer and all agencies having jurisdiction over the work, in writing, at least ninety-six (96) hours, excluding holidays and weekends, prior to instituting any lane closure or detour.
At the end of each workday, the Contractor shall inform the Engineer, Police Department and Fire Departments of the status of all detours, lane restrictions, or road closures. The Contractor shall cooperate and coordinate with the various parties involved in the collection and removal of trash and garbage, the transit
7.j.2
Packet Pg. 310 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-53 Project No. C1737-22
providers, the U.S. Postal Service, and others, as necessary, in order to maintain existing schedules and services.
6. Emergency Vehicle Access Through Detours - During all detours and/or street closures the Contractor shall provide for the movement of emergency vehicles through the work area. It is essential that the Contractor’s work and equipment does not impede emergency access.
7. Night Detours - The Contractor shall not be permitted to maintain any lane closure or road closure during non-working hours without first obtaining written approval from the Engineer. During non-working hours the Contractor shall restore travel lanes to their original alignment and configuration by means of placing temporary asphalt pavement or bridging with steel plates. The Contractor shall place “ROUGH ROAD” signs conforming to the Manual of Uniform Traffic Control Devices at uneven temporary pavement or bridging locations. See General Provisions, Section 9.18 (b), “Trench Safety Requirements”.
8. Temporary Traffic Lanes – Temporary traffic lanes shall be at least ten (10) feet wide, or eleven (11) feet wide around curves. Provide an additional two (2) feet of clearance from curbs. The length of temporary lanes should be limited to the area under construction and the distance necessary to divert traffic. (d) Parking Restrictions - The Contractor shall post approved “No Parking” signs at all locations necessary to establish work areas and detour traffic. Signs shall read: “NO PARKING - CONSTRUCTION TOW-AWAY ZONE,” show the actual day and hours of parking restriction and indicate the telephone number of the City’s Police Department or agency having jurisdiction. Signs shall be placed at least forty-eight (48) hours in advance of the restriction. The Engineer shall approve the location and duration of no parking limits and verify their placement. “No Parking” signs shall be removed when no work is under construction and must be reposted forty-eight (48) hours before the resumption of construction activities.
For any violation of “No Parking” signs by motorists, the Contractor shall contact and coordinate directly with the City’s Police Department for removal of vehicles in accordance with the California Vehicle Code. The Contractor shall also coordinate with the Police Department directly for enforcement and towing of parked vehicles.
9.21 Safety - The Contractor shall be solely responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the performance of the work. The Contractor’s responsibilities shall specifically provide for the safety of persons involved in the project, other persons who are affected by the performance of the work, the work in place, materials and equipment to be incorporated in the work, the project site, and adjoining property.
The services of the City in conducting inspection or construction review of the Contractor's performance is not intended to include review of the adequacy of the Contractor's work methods, equipment, bracing, shoring or scaffolding, or safety measures, in, on, or near the construction site.
Safety vests and personal protection equipment shall be worn by the Contractor, all subcontractors and other personnel when working or present on the site. Hard hats shall be worn when working around earthmoving or any heavy construction equipment or during any overhead construction work.
Payment for performing all work necessary to provide safety measures shall be included in the bid items for which safety measures are required and no additional compensation will be made. (a) Safety Orders – The Contractor shall have at the work site, copies or suitable extracts of:
Construction Safety Orders, Tunnel Safety Orders, and General Industry Safety Orders
7.j.2
Packet Pg. 311 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-54 Project No. C1737-22
issued by the State Division of Industrial Safety. The Contractor shall comply with provisions of these and all other applicable laws, ordinances, and regulations. (b) Trench Safety Requirement - As required by California Labor Code, Section 6705 and in addition thereto, for any excavation of any trench or trenches five (5’) feet or more in depth, the Contractor shall submit to the Engineer for review, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches.
Structural calculations prepared, stamped and signed by a Registered Engineer licensed to practice in the State of California shall accompany the plan to verify the structural safety and adequacy of the sheeting, shoring and bracing to be used on the project. No such plan shall allow any shoring, sloping or a protection system less effective than that required by the Construction Safety Orders of the State Division of Occupational Safety and Health.
The maximum length of open trench shall be three-hundred (300) feet or the distance that pipe can be installed in a single day as determined by the Engineer. Trenches shall be backfilled and covered with two (2) inches of cutback (in paved areas) or bridged with tack-welded steel plates at the end of each workday. Cutback shall be placed around plate edges to provide a smooth transition and to secure against displacement.
As soon as possible under the provisions of these specifications, the Contractor shall backfill all excavations and restore to usefulness all improvements that existed prior to the start of construction.
(c) Confined Space Entry Program (CSEP) - Entry into permit-required confined spaces as defined in Section 5157, Title 8, California Code of Regulations (CCR) may be required as a part of the work. All manholes, tanks, vaults, pipelines, excavations, or other enclosed or partially enclosed spaces shall be considered permit-required confined spaces until the pre-entry procedures demonstrate otherwise. The Contractor shall be responsible for implementing, administering, and maintaining a confined space entry program (CSEP) in accordance with Sections 5156, 5157, 5158, Title 8, CCR and shall implement such a program prior to performing any work in a permit-required confined space. A copy of the permit shall be available at all times for review by the Contractor and City personnel at the work site.
Prior to starting work, the Contractor shall prepare and submit its comprehensive CSEP to the Engineer. The CSEP shall address all potential physical and environmental hazards and contain procedures for safe entry into confined spaces, including, but not limited to the following:
1. Training of personnel
2. Purging and cleaning the space of materials and residue
3. Potential isolation and control of energy and material inflow
4. Controlled access to the space
5. Atmospheric testing of the space
6. Ventilation of the space
7. Special hazards consideration
8. Personal protective equipment
9. Rescue plan provisions
The Contractor’s CSEP submittal shall also include the names of the Contractor’s and Subcontractor’s personnel assigned to the project who will have CSEP responsibilities, their CSEP training, their specific assignment and their responsibilities in carrying out the CSEP.
7.j.2
Packet Pg. 312 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-55 Project No. C1737-22
Payment for implementing, administering, and providing all equipment and personnel associated with the CSEP shall be included in the bid items for which the CSEP is required and no additional compensation will be made.
(d) Hazardous Conditions: Contractor’s Responsibility for Precautions - Contractor agrees that if, during the progress of the work, a hazardous condition is identified which involves a risk of bodily harm to any person or a risk of damage to any property, the Contractor will take such special precautions as shall be necessary to make the progress of the work safe under such condition. Conditions may result from, but are not limited to, the use of specified materials or equipment, the location of the work, the condition of the site, the kind or method of construction, or the manner in which any of the work is required to be done. The Contractor agrees to assume the sole responsibility for determining whether any such hazardous condition exists or will be created during the course of the work. (e) Use of Explosives – Explosives may be used only when authorized in writing by the Engineer, or as otherwise stated in the Specifications. Explosives shall be handled, used, and stored in accordance with all applicable regulations. No explosive material shall be transported to, stored or utilized on the site without written permission of Engineer. All blasting work and handling of explosives on the site shall be done only by qualified persons who possess a valid permit. The Engineer’s approval of the use of explosives shall not relieve the Contractor from liability for claims caused by blasting operations.
(f) Special Hazardous Substances and Process – Materials that contain hazardous substances or mixtures may be required on the work. A Material Safety Data Sheet as described in California Code of Regulations, Section 5194 shall be requested by the Contractor from the manufacturer of any hazardous products used and submitted to the Engineer.
Hazardous material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer warnings and application instructions listed on the Material Safety Data Sheet and on the product container label.
The Contractor shall notify the Engineer if a specified product cannot be used under safe conditions.
9.22 Patent Fees or Royalties - All fees, royalties or claims for any patented invention, article or method that may be used upon or in any manner connected with the work under this contract shall be included in the price bid for the work and the contractor and the Contractor’s sureties shall protect and hold the City, together with all the City's officers, agents, servants and employees, harmless against any and all demands made for such fees or claims brought or made by the holder of any invention or patent and, before the final payment is made on account of this contract, contractor shall, if requested by the Engineer, furnish acceptable proof of a proper release from all such fees or claims.
Should the contractor, his agents, servants or employees, or any of them, be enjoined from furnishing or using any invention, article, material or appliance supplied or required to be supplied or used under this contract, the contractor shall promptly substitute other articles, materials or appliances, in lieu thereof, of equal efficiency, quality, finish, suitability and market value and satisfactory in all respects to the Engineer. Or, in the event that the Engineers elects in lieu of such substitution to have supplies and to retain and use any such invention, article, material or appliance as may be required by the contract to be supplied – in that event, the contractor shall pay such royalties and secure such valid licenses as may be requisite and necessary for the City, the City's officers, agents, servants and employees, or any of them to use such invention, article, material or appliance without being disturbed or in any way interfered with by any proceeding in law or equity on account thereof. Should the contractor neglect or refuse to make the substitution promptly, or to pay such royalties and secure such licenses as may be necessary, then, in that event, the Engineer shall have the right to make such substitution or the City may pay such royalties and secure such licenses and charge the cost thereof against any monies due the contractor from the City or recover the amount thereof from the Contractor and any sureties notwithstanding final payment under this contract may have been made.
7.j.2
Packet Pg. 313 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-56 Project No. C1737-22
9.23 Advertising - The names of the Contractor or Subcontractors, with their addresses and the designation of their particular specialties, may be displayed at the job site on removable signs only if written approval is received from the Engineer. Commercial advertising material shall not be attached to, or painted on the surfaces of, any buildings, fences, canopies, or barricades.
9.24 Antitrust Claims – Attention is directed to Public Contract Code, Section 7103.5 which provides: “In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or Subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec 15) or the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or subcontract. The assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgement by the parties.”
9.25 Audit and Examination of Records – The City and entities and agencies designated by the City, shall have access to, and the right to audit and examine at no additional cost, all of the Contractor’s project related data including but not limited to, books, estimates, records, contracts, bid cost data, Subcontractor and supplier job cost data, change orders, correspondence, instructions, drawings, receipts, vouchers, purchase orders, notes, computations, daily logs, and memoranda relating to the work. Pursuant to Government Code, Section 8546.7, the Contractor shall preserve all such records and will be subject to examination and audit by the State Auditor, at the request of the City, for a period of three (3) years after final payment under the Agreement.
9.26 Notice of Entrance - Before entering any private property the contractor shall give the owner, tenant and inspector a minimum of forty-eight (48) hours written notice.
9.27 Additional and Emergency Protection - Wherever, in the opinion of the Engineer, the contractor has not taken sufficient precautions for the safety of the public or the protection of the works to be constructed under this contract, or of adjacent structures or property which may be injured by processes of construction on account of such neglect, and whenever, in the opinion of the Engineer, an emergency shall arise and immediate actions shall be considered necessary in order to protect personal and property interest, whether public or private, then and in that event, the Engineer, with or without notice to the contractor, may provide suitable protection to the said interests by causing such work to be done and such material to be furnished as shall provide such protection as the Engineer may consider necessary and adequate.
The cost and expense of such work and material so furnished shall be borne by the contractor and if the same shall not be paid on presentation of the bills therefore, then such costs shall be deducted from any amounts due or to become due the contractor. The performance of such emergency work under the direction of the Engineer shall in no way relieve the contractor from any damages which may occur during or after precaution has been taken by the Engineer.
9.28 Placing Portions of Work in Service - Portions of the work may be placed in service as completed if desired by the City. Contractor shall give proper access to the work for this purpose. Such use and operation shall not constitute an acceptance of the work and the work, and the contractor shall be liable for defects due to faulty construction until the entire work under the contract is finally accepted.
9.29 Rights-of-Way - The City will provide all rights-of-way and easements in or beneath which pipes and other structures will be constructed by the Contractor under this contract. If through the failure of the City to acquire or clear title to rights-of-way, the Contractor sustains loss which could not have been avoided by the judicious handling of forces and plant, there shall be paid to the contractor such amount as the Engineer may find to be a fair and reasonable compensation for such part of the Contractor's actual loss as the Engineer deems unavoidable. Actual loss shall be understood to include no items other than necessary payments, idle time of men, idle time of equipment, cost of extra moving of equipment, and cost of longer hauls, with no allowance in any case for overhead or profit. If performance
7.j.2
Packet Pg. 314 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-57 Project No. C1737-22
of the Contractor's work is delayed as a result of the failure of the City to acquire or clear title to rights-ofway, a commensurate extension of time will be granted.
7.j.2
Packet Pg. 315 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-58 Project No. C1737-22
SECTION 10 - MEASUREMENT AND PAYMENT
10.01 F.O.B - All shipments must be Free on Board (F.O.B.) destination to the Work site and/or other sites indicated in the Contract Documents. The Contract Price is all-inclusive (including sales tax). There will be no additional compensation paid for containers, packing, unpacking, drayage or insurance.
10.02 Schedule of Values - Within ten (10) calendar days after the issuance of the Notice of Award, the Contractor shall furnish to the City a detailed Schedule of Values giving a complete breakdown of large lump sum prices and items which include numerous subdivisions of work. The schedule of values shall only include line items for installed materials. Materials delivered to the site shall not be paid until installed and inspected. The Contractor and City shall jointly review the Schedule of Values and make any adjustments in value allocations if, in the sole opinion of the City, changes are necessary to establish fair and reasonable allocation of values for the Work components. Front end loading will not be permitted. If, in the City's judgment, more detail (i.e. more items of work) is necessary, the Contractor shall add the additional items identified by the City. The Contractor shall submit any necessary revisions for the completed Schedule of Values within 10 calendar days from the City’s request for revisions. The costs indicated in making up this breakdown will be used as a basis for partial payments and shall not be considered as fixing a basis of additions or deductions from the contract.
General conditions and profit, bonds and insurance, clean up, and as-builts and closeout, shall all be listed separately on the schedule of values. General conditions and profit shall be billed at as a percentage of overall completion.
10.03 Payment Submittal - The Contractor must submit to the Project Manager his or her partial payment estimate no later than the 27th day of the month. When the 27th falls on a weekend or holiday submittal must be on the first workday prior to the 27th. The partial payment estimate must be a verified application for payment and schedule of values supported by a statement showing all materials installed and inspected during the preceding month and the cost of labor actually expended in the performance of the Work shown as a percent completed. Unless otherwise provided in the Contract Documents, no allowances or payments will be made for uninstalled material or equipment. Additionally, all work incorporated into the Project must be inspected and approved by the Inspector of Record in order to be eligible for payment. The superintendent and the Inspector of Record shall verify and agree on the billing prior to submission to the Project Manager.
To be eligible for payment the Contractor’s applications for progress payment must be accompanied by:
(a) Certified payroll reports, including “Statement of Non-Performance” for periods where no Work was performed. Certified payroll shall be prepared in accordance with California Labor Code Section 1776 and the Contract for each employee of the Contractor and any subcontractors engaged in the performance of the Work during the preceding months.
Applications for payment will not be processed without certified payroll reports. (b) Conditional waiver and release upon progress payment forms that conform to Civil Code 8132 from each Contractor, subcontractor, supplier and other entity with rights against the City covering the payment requested;
(c) Unconditional waiver and release upon progress payment form that conforms to Civil Code 8134 from Contractor covering the prior payment period, if payment has been received by Contractor.
(d) Unconditional waiver and release upon progress payment forms that conform to Civil Code 8134 from each subcontractor, supplier and other entity with rights against the City, covering
7.j.2
Packet Pg. 316 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-59 Project No. C1737-22
the prior payment periods for which payment has been received at least 20 calendar days prior to the date of submission of the Progress Payment Application; (e) An updated Project Schedule showing the progress of Construction Work on the Site through the billing period;
(f) Daily logs, Sign in sheet and daily tally for the month; and such other documentation as City may reasonably request.
The City will review applications for payment as soon as practical after receipt. Any application or part of an application that is determined to be improper will be returned to the Contractor as soon as practicable, but no later than seven calendar days after receipt by the City, along with a written description of the reasons why the application is improper. The Contractor’s failure to submit a schedule by the time specified in these General Provisions, or its submission of a schedule to which the City has taken any uncorrected exception, will serve as a basis for returning an application for payment in its entirety.
The City will make progress payments to the Contractor in accordance with applicable law in the amount of ninety-five (95) percent of the value of the labor actually performed and the material incorporated in the Work and inspected as specified in Contractor’s verified application for payment upon approval by the City’s authorized representative(s). Payment of progress payments will not be construed as acceptance of the Work performed.
Wherever the estimated quantities of Work to be done and materials to be furnished on a unit price basis under this Contract are specified in any of the Contract Documents, including the proposal, such quantities are specified for purposes of comparing bids, and the right is expressly reserved, except as otherwise expressly provided, to increase or diminish such quantities as may be deemed reasonably necessary or desirable by the Project Manager and the City to complete the Work. No such increase or diminution will be a basis for claims for adjustments in the Contract Price other than adjustments necessary to reflect the impacts of such changes in quantities based on the applicable contract prices.
If the City fails to make a progress payment within thirty (30) calendar days of receipt of an undisputed, properly submitted application for payment, the City will pay the Contractor interest equivalent to the legal rate set forth in subdivision (a) of California Code of Civil Procedure Section 685.010. The number of Days available to the City to make a payment without incurring an interest obligation pursuant to this provision will be reduced by the number of Days, if any, by which the City has delayed return of an application for payment beyond the seven day return requirement set forth in these General Provisions.
10.04 Adjustments for Unilateral Chane Orders – If the City issues a unilateral change order the Contractor must upon notification from the City include in their upcoming payment application include the costs and/or credits detailed in the unilateral change order.
10.05 Final Payment - The City will pay the Contractor’s final invoice in accordance with applicable law and this Section following acceptance of the Work provided that:
(a) The Contractor has furnished evidence satisfactory to the City that all claims for labor and material have been paid, or the time for filing valid stop notices has passed and no stop notices have been filed, or all stop notices filed have been released by valid release or release bond acceptable to the City.
(b) No claim has been presented to the City by any person based upon any acts or omissions of the Contractor or any subcontractor engaged in the performance of the Work. (c) No other claim or dispute exists under the Contract or applicable law concerning payment of the Contractor’s final invoice and/or release of the Contract retention.
7.j.2
Packet Pg. 317 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-60 Project No. C1737-22
(d) The Contractor has filed with the City the Maintenance Bond provided in the Contract Documents with duly notarized signatures of an authorized representative of the Contractor and an attorney-in-fact of an admitted surety insurer acceptable to the City and such Maintenance Bond binds the Contractor as Principal and the Surety in accordance with its terms in the amount of ten (10) percent of the final Contract Price. (e) Conditional release and waiver of lien upon final payment forms from the Contractor, subcontractors and suppliers; (f) As-Built Documents, operations and maintenance manuals, warranties, spare parts, attic stock, keys, key schedule, and other items required by the Contract Documents have been delivered to the City; and
(g) As a condition of final approval and retention release, the Contractor shall submit documentation which shall include a summary to the City that demonstrates compliance with the approved Waste Management Plan. Projects that establish monthly progress payments shall also require monthly reporting on the Waste Management Plan. Such reports shall be submitted prior to the monthly cutoff for progress payments in order for the progress payment to be considered for payment and shall include at a minimum, a summary of waste materials recycled, salvaged and disposed of by the Project. Submitted with this summary will be original documentation (receipts/scale tickets, waybills) showing the quantities and types of materials diverted and disposed. A notice of completion will not be filed for the project and retention released until all reports as required for the Project are submitted and approved. (h) All training sessions for City 's personnel has been completed. (i) The Site and the Buildings have been cleaned per these general provisions. (j) The City has accepted the work and filed a notice of completion with the County of San Mateo.
To be eligible for final payment, the Contractor’s applications for final payment must be accompanied by:
(a) Certified payroll reports, including “Statement of Non-Performance” for periods where no Work was performed. Certified payroll shall be prepared in accordance with California Labor Code Section 1776 and the Contract for each employee of the Contractor and any subcontractors engaged in the performance of the Work during the preceding months.
Applications for payment will not be processed without certified payroll reports. (b) Unconditional waiver and release upon final payment on forms that conform to Civil Code 8138 from each Contractor, subcontractor, supplier and other entity with rights against the City covering the payment requested;
(c) Release of all claims;
(d) Unconditional waiver and release upon progress payment form that conforms to Civil Code 8134 from Contractor covering the prior payment period, if payment has been received by Contractor.
(e) Unconditional waiver and release upon progress payment forms that conform to Civil Code 8134 from each subcontractor, supplier and other entity with rights against the City, covering the prior payment periods for which payment has been received at least 20 calendar days prior to the date of submission of the Progress Payment Application; (f) Such other documentation as City may reasonably request.
7.j.2
Packet Pg. 318 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-61 Project No. C1737-22
10.06 Non-Allowable Direct Charges - The following costs are not allowable direct charges under the Contract. The following costs may only be paid under the Contract, if at all, as part of any allowance for contractor overhead and/or profit established under the Contract. (a) Labor costs in excess of no more than 10% of applicable prevailing wages pursuant to the Contract and applicable law, liability and workers compensation insurance, social security, retirement and unemployment insurance and other employee compensation and benefits pursuant to bona fide compensation plans in effect at the time specified for the opening of Project bids for contractor and subcontractor employees engaged in the performance of the Work, or in excess of the labor costs specified in these General Provisions in the case of cost impacts involving items for which the Contract Documents do not specify prices, and for which no lump sum amount has been approved by the City. However, in no event will allowable direct labor charges under the Contract include employee bonuses, employee profit sharing, employee vehicles or vehicle allowances, employee telephones or telephone allowances, or employee housing or housing allowances, whether or not such benefits are part of a bona fide compensation plan in effect at the time specified for the opening of Project bids.
(b) Superintendent labor and clerical labor.
(c) Bond premiums in excess of that required under these General Provisions. (d) Insurance in excess of that required under these General Provisions. (e) Utility costs.
(f) Work Site office expenses
(g) Home office expenses.
(h) Permit or license costs.
10.07 Retention - City will withhold a retention of five percent (5%) of the amount approved for payment for Construction Work and any additional amounts allowed under these General Provisions.
This retention will be withheld by the City until the project has been completed, approved by the City, a Notice of Completion has been filed, and a release of all claims has been provided. The Contractor shall be required to submit for payment an additional Progress Payment Application for the retention withheld once all conditions have been met.
10.08 Securities in Lieu of Retention - In accordance with Public Contract Code Section 22300, except where federal regulations or polices do not permit substitution of securities, the Contractor may substitute securities for any moneys withheld by the City to ensure performance of the Work. At the Contractor’s request and expense, securities equivalent to the amount withheld will be deposited with the City, or with a state or federally chartered bank in California as the escrow agent, who will then pay those moneys to the Contractor under the terms of an Escrow for Security Deposit agreement. The Escrow for Security Deposit agreement is provided in the Contract Documents. Upon satisfactory completion of the Work, the securities will be returned to the Contractor less any withholdings for liquidated damages or other withholdings listed in this Section 10.
Alternatively, at the Contractor’s request and expense, the City will pay retentions earned directly to the escrow agent. Securities eligible for investment in accordance with this provision include those listed in Government Code Section 16430, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the City.
The Contractor will be the beneficial owner of any securities substituted for moneys withheld and will receive any interest thereon.
7.j.2
Packet Pg. 319 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-62 Project No. C1737-22
If the Contractor elects to submit securities in lieu of having progress payments retained by the City, the Contractor will, at the request of any subcontractor performing more than 5% of the Contractor’s total bid, make the same option available to the subcontractor.
10.09 Additional Witholdings - City will withhold a retention of five percent (5%) of the amount approved for payment for all Construction Work. Additionally, the City or its agent may as a special withholding, in accordance with the Contract Documents and applicable law, withhold any payment of monies due or that may become due to the Contractor because of:
(a) Defective work not remedied or uncompleted work.
(b) Claims filed or reasonable evidence indicating probable filing of claims. (c) Failure to properly pay subcontractors or to pay for material or labor. (d) Reasonable doubt that the Work can be completed for the balance then unpaid. (e) Unilaterally issued change orders
(f) Damage to another contractor.
(g) Damage to the City.
(h) Damage to a third party.
(i) Delay in the progress of the Work, which, in the City’s judgment, is due to the failure of the Contractor to properly expedite the Work.
(j) Liquidated damages or other charges that apply to the Contractor under the Contract. (k) Any other lawful basis for withholding payment under the Contract.
The Contractor agrees that the payment of the final amount due under the contract shall release the City of San Carlos from any and all claims or liability on account of all work performed under the contract, except those items previously made in writing and identified by the Contractor as unsettled.
Release of the final payment by the City shall not be construed as an acceptance of any defective work or acceptance of improper materials.
10.10 Acceptance - Contractor shall notify Engineer in writing of the completion of the work, whereupon the Engineer shall promptly satisfy them self by personal inspection as to the actual completion of the work in accordance with the terms of the contract. After receiving a written recommendation from the Engineer for acceptance of the work, City shall accept or reject the work; stating, if the work is rejected, the requisite conditions for acceptance. When the City accepts the work, they shall file a Notice of Completion with the County Recorder in the county where the work is located and shall promptly notify the contractor in writing of the recordation. Contractor warrants and guarantees that title to all work, materials and equipment accepted by the City will pass to the City free and clear of all liens, claims, security interests or encumbrances, and that no work, materials or equipment accepted will have been acquired by the contractor, or by any other person performing the work at the site or furnishing materials or equipment for the project, subject to an agreement under which an interest therein or encumbrances thereon is retained by the seller or otherwise imposed by contractor of such other person.
10.11 Compensation for Extra or Omitted Work – Compensation for extra or omitted work shall be in accordance with Section 5.08, Change Orders.
10.12 Compensation to City for Extension of Time - In case the work called for under this contract is not completed within the time limit stipulated herein, the City shall have the right, as provided
7.j.2
Packet Pg. 320 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-63 Project No. C1737-22
hereinabove, to extend the time of completion thereof. If the time limit so be extended, the City shall have the right to charge to the contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, administration, legal and other overhead expenses which are directly chargeable to the extension of time. The cost of final surveys and preparation of the final estimate shall not be included in such charges.
10.13 Claims - The term “Claim” shall mean a written demand or assertion by the Contractor seeking, as a matter of asserted right, adjustment in the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, or determination of other disputes or matters in question between the City and Contractor arising out of or related to the Contract Documents or the performance of the work, including claims alleging an error or omission.
A claim must be stated with specificity, including identification of the event giving rise to claim, the date of the event, and the asserted effect on contract sum and contract time. The claim shall include adequate supporting data. Adequate supporting data for a claim for an adjustment of the contract time shall include scheduling data demonstrating the impact of the event on the completion of the work.
Adequate supporting data for a claim for an adjustment of the contract sum shall include a detailed cost breakdown of the items allowed, isolating labor, material, and equipment costs, and providing detailed quantities and unit prices for changed work. If the exact amount of a claim is not ascertainable at the time such claim is made, the supporting data currently available shall be submitted. Supplemental data supporting the exact amount of the claim shall be submitted as soon as available.
Notwithstanding the making of any claim or the existence of any dispute regarding any claim, unless otherwise directed by the Engineer, the Contractor shall not cause any delay, cessation, or termination in the performance of the work, including portions of the work pertaining to a claim.
10.14 Time Limit on Claims - Contractor shall submit any and all claims, together with adequate supporting data to the Engineer as soon as possible but not later than ten (10) working days after occurrence of the event giving rise to the claim, or the date the Contractor first recognized, or reasonably should have recognized, the condition giving rise to the claim, whichever is earlier. Contractor hereby expressly waives all claims not made within this time limit.
Contractor is expressly barred from asserting any claims of which the Contractor was aware, whether or not the exact amount of such claims was ascertainable, that is not submitted to the Engineer prior to the Contractor proceeding with the work.
10.15 City Response to Claims - The Engineer shall promptly review claims. If additional supporting data is deemed necessary, the Engineer shall request such additional data within ten (10) working days after receipt of the claim. The Contractor shall furnish such additional data no later than ten (10) working days after receipt of the City’s request. The Engineer shall render a decision promptly, but in any event, within thirty (30) working days after the receipt of the claim or the receipt of additional supporting data. If the amount of the claim is in excess of $50,000, the aforesaid thirty (30) working day period shall be sixty (60) working days. Failure of the Engineer to render a decision within the aforesaid thirty (30) or sixty (60) working day period shall be deemed a decision denying the claim and the last day of such period shall be the date of such decision. The decision of the Engineer shall be final and binding unless appealed in accordance with the General Provisions, Section 10.16, “Appeal of the Engineer’s Decision”.
10.16 Appeal of Engineer’s Decision - If Contractor disputes the Engineer’s decision of a claim, the Contractor shall, within thirty (30) calendar days of the decision, make a written appeal of the decision to the Engineer. The written appeal shall include all supporting data upon which the Contractor requests the City to modify its decision, including all documentation transmitted between the Contractor and the Engineer on the underlying claim. The Engineer shall make a good faith effort to resolve the claim prior to final completion of the Project. In the event the claim is not resolved prior to final completion, the Contractor’s claim shall be heard by the Director of Public Works prior to recommending final acceptance to the City Council. The Contractor’s administrative remedies under the Contract Documents shall be
7.j.2
Packet Pg. 321 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-64 Project No. C1737-22
exhausted after the decision of the Director of Public Works is rendered. In case of disagreement with the decision of the Director of Public Works, the Contractor may pursue the resolution of the dispute by presenting a formal claim to the City.
7.j.2
Packet Pg. 322 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) General Provisions 2022 Sewer Lateral Replacement Project Page GP-65 Project No. C1737-22
SECTION 11 - GUARANTY
11.01 Contractor’s Guaranty - Prior to final acceptance, the Contractor shall warrant and guaranty to the City that all work is in accordance with the Contract Documents and is not defective.
The guaranty shall be accompanied by a warranty bond for ten percent (10%) of the final contract sum, which shall warrant the quality of the work for a period of two (2) years after acceptance. The guaranty and warranty bond shall be in accordance with the Agreement Forms furnished in the Contract Documents.
11.02 Correction of Defective Work During the Guaranty Period - If within two (2) years after the date of City Council acceptance, or such longer period of time as may be prescribed by laws or regulations or by the terms of any applicable special guaranty required by the Contract Documents, any work is found to be defective, the Contractor shall promptly without cost to the City and in accordance with the City’s written instructions, either correct such defective work or if it has been rejected by the City, remove it from the site and replace it with non-defective work.
If the Contractor does not promptly comply with the terms of such instructions within ten (10) working days after written demand by the City, the City may have the defective work corrected. The City may also correct defective work immediately in cases of emergency where delay would cause serious risk of loss or damage. All direct, indirect and consequential costs of correcting defective work (including but not limited to fees and charges of engineers, architects, attorneys and other professionals) shall be absorbed by the Contractor.
The Contractor shall remove from the Project site portions of the work and materials which are not in accordance with the Contract Documents and which are neither corrected by the Contractor nor accepted by the City. If Contractor fails to pay the costs of such removal within ten (10) working days after written demand, the City may, without prejudice to other remedies, sell such materials at auction or at private sale, or otherwise dispose of such material. The Contractor shall be entitled to the proceeds of such sale, if any, in excess of the costs and damages for which the Contractor is liable to the City, including reasonable attorneys’ fees and expenses and compensation for the City’s services and expenses.
The City shall have the option, at its sole discretion and by notice to the Contractor, to accept defective work as defined in Section 4.18 – “Acceptance of Defective Work. “
7.j.2
Packet Pg. 323 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs)
SPECIAL PROVISIONS
7.j.2
Packet Pg. 324 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) This Page Intentionally Left Blank
7.j.2
Packet Pg. 325 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs)
TABLE OF CONTENTS
1. Description of Work ............................................................................................................ 4
2. Location ............................................................................................................................. 4
3. Qualification of Bidders ...................................................................................................... 4
4. Days & Hours of Operation ................................................................................................ 4
5. Control of Work .................................................................................................................. 4
6. Licenses and Permits ......................................................................................................... 4
7. Safety and Health Regulations ........................................................................................... 5
8. Safety of Persons And Property ......................................................................................... 5
9. Staging Area ...................................................................................................................... 6
10. Contractor’s Plant and Equipment ...................................................................................... 6
11. Traffic Control .................................................................................................................... 6
12. Storm Water Pollution Prevention ...................................................................................... 9
13. Water ................................................................................................................................. 9
14. Power .............................................................................................................................. 10
15. Dust Control ..................................................................................................................... 10
16. Hazardous Material Abatement ........................................................................................ 10
17. Cleanup ........................................................................................................................... 11
18. Protection and Restoration of Existing Improvements ...................................................... 11
19. Existing Utilities ................................................................................................................ 12
20. Utility Coordination ........................................................................................................... 12
21. Notification of Residents and Merchants .......................................................................... 13
22. Construction Schedule ..................................................................................................... 13
23. Daily Work Reports .......................................................................................................... 13
24. Submittals ........................................................................................................................ 13
25. Insurance and Indemnification ......................................................................................... 14
26. Construction Site Trailers ................................................................................................. 20
7.j.2
Packet Pg. 326 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-4 Project No. C9823
SPECIAL PROVISIONS
These Special Provisions contain project specific requirements pertaining to the work, and as such, shall take precedence over the General Conditions portions of these Specifications. All costs associated with satisfying the requirements in these Special Provisions shall be included in the Contractor’s bid price and no additional compensation shall be made.
All work shall be done in accordance with the latest California Building Standards Code, City Standard Specifications, City Standard Details, Caltrans Standard Specifications (where referenced), and the Contract Documents.
1. DESCRIPTION OF WORK
The work to be done under this contract includes, but is not limited to, the construction of Fire Station 16. :
The Contractor shall furnish all materials, labor, tools, equipment, supervision, transportation, handling, storage, traffic control, permits, licenses, and all other incidentals necessary to complete the work successfully.
2. LOCATION
Work to be done under this contract is at Fire Station No. 16 located at 1280 Alameda de las Pulgas, San Carlos CA 94070.
3. QUALIFICATION OF BIDDERS
The Contractor shall be pre-qualified prior to submitting a bid proposal.
4. DAYS & HOURS OF OPERATION
The hours of operation shall be limited to the hours between 8:00 a.m. and 4:30 p.m.
With the exception for work on San Carlos Avenue, Holly Avenue, and Alameda de las Pulgas, which shall be between 9:00 a.m. and 3:00 p.m.
Activities outside of those hours shall not generate objectionable noise, dust, or inconvenience to the public. Regular working days are from Monday through Friday except City legal holidays unless exception is granted by the City Building Official and/or Engineer.
5. CONTROL OF WORK
The Contractor shall as the first order of work coordinate with all residents and businesses seventy-two (72) hours in advance of any work.
6. LICENSES AND PERMITS
The Contractor and all subcontractors shall obtain a business license from the City of San Carlos and shall hold current licenses for the craft that the business is contracting for as required by Federal, State and Local laws.
7.j.2
Packet Pg. 327 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-5 Project No. C9823
The Contractor shall apply for any required permits, including encroachment and tree removal permits from the applicable agencies (with copies of the form and application submitted to the Engineer) within thirty (30) calendar days after the issuance of the Award of Contract Notification Letter and prior to beginning work in the affected areas.
The Contractor shall submit copies of the permits, once issued, to the Engineer. No additional time schedule will be granted to the Contractor for any delays resulting from the processing of these permits.
If the construction work will require any street trees to be trimmed, Contractor shall obtain a “Street Tree Permit” from the City of San Carlos Community Development Department - Planning Division. Applications for Street Tree Permits are available by calling the Planning Division at (650) 802-4263. It is the Contractor’s responsibility to obtain fee information updates.
A City of San Carlos “Hazardous Materials Storage System Permit” may be required for various construction activities. The Contractor is responsible for verifying to the requirements and fee schedule for storage of diesel fuel and/or hazardous materials by contacting the City of San Carlos Fire Department at (650) 802-4300. It is the Contractor’s responsibility to follow any additional requirements as required by the 2016 California Fire Code.
7. SAFETY AND HEALTH REGULATIONS
The Contractor shall comply with all applicable occupational safety and health standards, rules, regulations and orders established by Federal and State Agencies.
Specific attention is directed also to OSHA safety rules, regulations and precautions to be taken by the Contractor before spaces or structures with respect to physical and chemical hazards that may be present.
The area of work shall at all times be protected by means of an adequate number of cones, barricades, flags or whatever means is necessary to properly and safely protect both vehicular and pedestrian traffic.
Any condition deemed to be an unsafe condition shall be immediately corrected by the Contractor. The failure of the City or its representatives to bring a potentially dangerous situation to the Contractor's attention shall not relieve the Contractor from the responsibility for providing a safe work area.
The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and safety programs in connection with the work and ensures compliance to all applicable safety and health regulations of federal, state, and local agencies.
8. SAFETY OF PERSONS AND PROPERTY
The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damages, injury or loss to:
1. All employees, City personnel, residents on the project, and all others who
7.j.2
Packet Pg. 328 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-6 Project No. C9823
may be affected thereby;
2. All the work and all materials and equipment to be incorporated therein, whether in storage on or off the site, under the care, custody or control of the Contractor or any of the Contractor’s subcontractors; and
3. The work of the City or other contractors.
The Contractor shall give all notices and comply with all applicable laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the safety of persons or property or their protection from damage, injury or loss.
The Contractor shall erect and maintain, as required by existing conditions and the progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations, and notifying owners and users of adjacent utilities.
The Contractor shall designate a Site Safety and Health Officer who is a responsible member of the Contractor’s organization and whose duty shall be the prevention of accidents. The Contractor shall submit the name of the Site Safety and Health Officer to the Engineer in writing. The Site Safety and Health Officer shall be responsible for preparation of a Health and Safety Plan.
The Health and Safety Plan shall detail the Contractors safety committee(s), safety rules, safety training, enforcement procedures, incentives, accident procedures and investigations, inspections, safety equipment and maintenance, hazardous materials (i.e. asbestos pipe) handling procedures, emergency action plan(s), alcohol and drug policies, confined space entry procedures, certification program and emergency retrieval procedures, 911 and emergency rescue services within jurisdiction of the work area, health providers and hospital emergency near the work site.
9. STAGING AREA
The City has not designated a staging area for this project. Should a staging area be desired, the Contractor shall be responsible for securing such an area along with any and all permits and permissions that may be necessary from the City and/or private property owners. Proof of concurrence shall be provided to the City upon request. Any fencing or other protective means (if required or employed by the Contractor) shall be at the contractor’s expense.
10. CONTRACTOR’S PLANT AND EQUIPMENT
The Contractor shall at all times be responsible for the security of all plant and equipment it owns or controls. The City will not take any responsibility for missing or damaged equipment, tools or personal belongings.
11. TRAFFIC CONTROL
Construction shall be organized so as to cause the least possible inconvenience to traffic.
7.j.2
Packet Pg. 329 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-7 Project No. C9823
Traffic control shall comply with the 2015 Caltrans Standard Plans T9 through T14 (available at http://www.dot.ca.gov/hq/esc/oe/project_plans/HTM/stdplns-US-customaryunits-new15.htm) Traffic control devices shall be furnished, placed, and maintained in accordance with the latest version of Part 6, Temporary Traffic Control, of the California Manual on Uniform Traffic Control devices (CAMUTCD) (available at http://www.dot.ca.gov/trafficops/camutcd/camutcd2014rev1.html).
Traffic Control shall be provided for all project work areas and shall be provided for the duration of the project.
The Contractor shall provide all required signs, barricades, lights, high-level flag trees, arrow boards, and other devices. The Contractor shall restrict construction activities to the following hours:
Schedule of Working Hours within Public Right of Way
Construction
Location Working Days Working Hours
Residential/Local
and
Collector
Monday through Friday 8:00 a.m. to 5:00 p.m.
Downtown San
Carlos
Monday through Friday 8:00 a.m. to 11:30 a.m.
and
1:30 p.m. to 4:00 p.m.
Arterial Monday through Friday 9:00 a.m. to 3:00 p.m.
No work shall be performed on Saturdays, Sundays, or designated legal holidays unless otherwise designated below.
No work shall be performed on Saturdays, Sundays, or designated legal holidays.
Exceptions may be made, at the Engineer’s discretion, to allow work at other times and on other days if required for the Contractor’s operations. In such cases, the Contractor shall have an alternate work schedule reviewed and authorized by the Engineer prior to commencement of work.
General Requirements:
1. The Contractor’s attention is directed to Section 9.20 of the General Provisions for additional requirements.
2. The Contractor shall submit a traffic control plan to the Engineer for review, including any requests for alternate work schedules or work hours. a. Separate typical traffic control plans shall be provided for typical conditions in residential areas, the state highway (El Camino Real), and major thoroughfares (Industrial Rd, Brittan Ave, Alameda de las Pulgas, and San Carlos Ave). b. No work may begin under contract until the Traffic Control Plan has been approved by the Engineer. Time required for review and approval of the Traffic Control Plan shall not constitute a basis for time extension.
7.j.2
Packet Pg. 330 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-8 Project No. C9823
3. The Contractor shall maintain temporary AC surface to provide safe and comfortable passage for pedestrian and vehicular traffic.
At the end of each day, all trench or access pit excavations shall be either backfilled or covered with traffic rated non-skid steel plates. The steel plates shall be countersunk flush with the adjacent grade to provide a smooth surface if the plates are located within the traveled way of the road. Cutbacks shall be applied in gaps and/or at edges. Adjoining plates shall be tack-welded where the plates meet.
Plates located outside of the traveled way shall be held in place by placing temporary asphalt around all edges.
4. The Contractor shall provide electric arrow board(s) for any lane closures and reductions, except for on residential streets.
Special Requirements:
1. The Contractor shall be responsible for providing and maintaining all temporary traffic control and safety devices, including all personnel necessary for effectively directing vehicular, pedestrian and bicycle traffic through the construction zone. The Contractor assumes sole and complete responsibility for the job and site conditions, including safety of all persons and property, from start until final acceptance of the project. This requirement shall apply continuously twenty-four (24) hours per day and shall not be limited to normal working hours.
2. Streets shall not be closed unless authorized by the Engineer in writing at least 48 hours prior to the requested date. If street closure is approved, Contractor shall notify the following 48 hours prior to the street closure:
a. City’s project manager and inspector
b. City of San Carlos Police Department, (650) 802-4277 c. City of San Carlos Fire Department, (650) 802-4300
d. City of San Carlos Garbage, Recycling, and Tree Trimming Haulers e. Recology San Mateo County (650) 595-3900
f. Affected School Districts
g. Impacted residents and businesses,
2. If emergency or urgent street closures are required, the Contractor shall notify:
a. City’s project manager and inspector
b. City of San Carlos Police Department, (650) 802-4277 c. City of San Carlos Fire Department, (650) 802-4300
3. The Contractor shall submit a schedule of traffic detours for street closure to the Engineer for review and approval. Noncompliance will result in suspension of work as outlined under Section 8.13, “Suspension of Work,” of the General Provisions.
4. Scheduling of night time or weekend work shall be subject to the authorization of the Engineer. Contractor shall specify dates on the construction schedule when night time or weekend work is proposed. A minimum of two (2) working days’ notice is required for any request to work at night or on weekends. No additional compensation for night or weekend work will be allowed therefor.
7.j.2
Packet Pg. 331 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-9 Project No. C9823
5. If construction will obstruct a bus stop, the Contractor shall notify the SamTrans Operations Control Center two (2) working days in advance at (650) 508-6200.
6. Access for local residents and businesses and all private property shall be maintained at all times. Signs shall be placed in front of commercial and industrial driveways to allow continual access. At the end of each working day these streets shall be reopened to through traffic with proper barricades, warning devices and temporary striping. If these streets are closed, the Contractor shall proceed expeditiously and with consideration for public convenience from the start of work to its completion.
7. Provide at least one (1) ten-foot (10’) minimum width through traffic lane in each direction.
12. STORM WATER POLLUTION PREVENTION
Consistent with the requirements of the federal Clean Water Act, the Project is subject to water pollution prevention requirements, which include the implementation of a water pollution prevention plan and/or implementation of local storm water requirements, and prohibit the discharge of pollutants from the Project site. The Contractor shall use appropriate Best Management Practices (BMPs) and source control techniques on the site at all times in order to prevent non-stormwater discharges from construction.
All work shall conform to the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ, NPDES No. CAS000002) ("General Permit"), and the NPDES Municipal Regional Stormwater Permit (MRP) (Order No. R2- 2015-0049, NPDES No. CAS612008). The Contractor shall implement all applicable San Mateo Countywide Water Pollution Prevention Program (SMCWPPP) measures and BMPs. Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations and/or a stop work order.
Prior to the start of any field work, the Contractor shall prepare a letter or plan which summarizes which BMPs and source control measures will be implemented on site to prevent non-stormwater discharges, and includes copies of any applicable California Department of Transportation Construction Site BMP Fact Sheets, or an approved equivalent.
The Contractor is responsible for furnishing, installing, constructing, inspecting, maintaining, removing, and disposing of the BMPs as necessary throughout the entirety of the project. The Contractor shall inspect BMPs regularly, and correct improperly installed, damaged, or ineffective BMPs immediately.
13. WATER
Water for use during construction shall be furnished by the Contractor and all costs incurred including the water use, meter charges, meter/backflow preventer deposit, vehicles and containers needed in transporting water to the job site shall be paid by the Contractor. The Contractor’s attention is directed to Section 9.11 of the General Provisions for additional information.
7.j.2
Packet Pg. 332 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-10 Project No. C9823
14. POWER
All power for and in connection with work to be done under this contract shall be furnished and maintained by Contractor. The Contractor’s attention is directed to Section 9.12(h) of the General Provisions for additional information.
15. DUST CONTROL
The Contractor shall furnish all labor, equipment and means required and shall carry out effective measures wherever and as often as necessary to prevent its operation from producing dust in amounts damaging to property or causing nuisance as defined by the Engineer.
The Contractor shall be responsible for any damage resulting from any dust originating from its operations.
The dust abatement measures shall be continued until the Contractor is relieved of further responsibility by the Engineer.
The use of water shall not be permitted as a substitute for sweeping or other methods of dust control. Only dry sweeping is allowed.
Contractor shall sweep daily. The work area shall be left in a neat and presentable condition at the end of each workday.
16. HAZARDOUS MATERIAL ABATEMENT
An Asbestos and Lead survey is included in an Appendix as part of the contract documents and were included with the bid documents. Contractor’s bid shall include the cost for removing and abating all materials as identified in the report/s. Contractor’s abatement shall be compliant with the plans and specifications, conditions of approval and the Mitigation and Monitoring
Program.
(1) Prior to demolition permit issuance, the City shall have all buildings that are proposed for demolition surveyed for asbestos-containing materials under the National Emissions Standards for Hazardous Air Pollutants (NESHAP) guidelines. All potentially friable asbestos containing materials shall be removed by the Contractor prior to building demolition in accordance with NESHAP guidelines and BAAQMD Regulation 11, Rule 2: Hazardous Materials; Asbestos Demolition, Renovation and Manufacturing.
The BAAQMD’s Enforcement Division shall be consulted prior to commencing demolition of a building containing asbestos materials. (2) Prior to demolition permit issuance, the City shall have all painted surfaces surveyed on all buildings scheduled for demolition. Based on the results of the survey, if lead-based paint is still bonded to the building surfaces, its removal is not required prior to demolition. If lead-based paint is peeling, flaking, or blistered, it shall be removed by the Contractor prior to demolition in accordance with state requirements. It is assumed that such paint will become separated from the building components during demolition activities; thus, it must be managed and disposed as a separate waste steam. Any debris or soil containing lead paint or coating must be disposed at
7.j.2
Packet Pg. 333 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-11 Project No. C9823
landfills that have acceptance criteria for the waste being disposed. The project shall follow the requirements outlined by California Occupational Safety and Health Administration (Cal-OSHA) Lead in Construction Standard, Title 8, California Code of Regulations (CCR) 1532.1 during demolition activities. These regulations include employee training, employee air monitoring, and dust control. (3) Unless otherwise stated, the Contractor shall be responsible for abatement, submitting for a J-Number from the BAAQMD and paying the associated fees to BAAQMD. Contractor shall be required to perform all abatement and shall also be required to submit for and obtaining the demolition permit from the City, Town or County. The City shall pay the demolition permit fee and shall be responsible for preparing the demolition plan documents. Utility disconnect responsibilities shall be listed on the plan documents.
17. CLEANUP
Through all phases of construction, including suspension of work and until final acceptance of the project, the Contractor shall keep the worksite and other areas used by it in a neat and clean condition, and free from any accumulation of rubbish and debris.
Disposal of all rubbish and surplus materials shall be off the site of construction, at the Contractor’s expense, all in accordance with local codes and ordinances governing locations and methods of disposal, and in conformance with all applicable safety laws, and the requirements of the OSHA Safety and Health Standards for Construction.
The Contractor is advised that the disposal of solid waste, sewage, industrial waste, or other polluted waters into the public storm drain system is prohibited. Any fines or penalties levied against the City or Contractor for illicit discharges to the storm drain system as a result of the Contractor’s operation are the sole responsibility of the Contractor.
If the Contractor exceeds the number of days assigned to this contract, the Contractor shall continue to clean the area. When street cleaning is not performed to the satisfaction of the Engineer, the Engineer may have the area cleaned by City crews, and any incurred costs shall be deducted from the Contractor’s progress payments.
18. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS The Contractor shall be responsible for the protection of public and private property adjacent to the Work and shall exercise due caution to avoid damage to such property.
The Contractor shall repair or replace all existing improvements which are not designated for removal (e.g., street sections, curbs, gutters, driveways, fences, walls, structures, landscaping, etc.) which are damaged or removed as a result of its operations. Repairs and replacements shall be at least equal to existing improvements, and shall match them in finish and dimensions.
Any damages to the private properties will be restored to the satisfaction of the property owners/Engineer within seven (7) days of the damage(s).
7.j.2
Packet Pg. 334 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-12 Project No. C9823
Damages within the public right of way will be restored to the satisfaction of the Engineer after work on that particular block is completed.
19. EXISTING UTILITIES
The Contractor shall notify Underground Service Alert (U.S.A) at 1-800-642-2444 for field location of all utilities 48 hours prior to any excavation. In addition, the Contractor shall contact the Railroad Call Before You Dig (CBUD) at 1-800-336-9193 for field location of utilities when work is within the railroad tracks a minimum of forty-eight (48) hours prior to any work.
The Contractor shall be responsible for verifying the presence of utilities within the limits of work, as well as any changes in the limits that are made to accommodate the project, protecting all utilities including but not limited to traffic signal conductors, signal interconnect communication, and fiber optic cables that may be affected by construction activities (e.g., clearing and grubbing, excavation, trenching, etc.), and notifying the Engineer in writing of any conflicts prior to beginning any excavation.
The Contractor shall pothole to verify the location and/or elevation of existing utilities as marked by Underground Service Alert (U.S.A.) within the limits of work. The Contractor shall work with utility companies and inspectors to protect existing utility lines. The Contractor shall notify the Engineer three (3) working days in advance of the potholing operation. Once the utilities are exposed, the excavation shall not be backfilled until the Engineer has inspected and taken measurements of the utilities.
Unless otherwise indicated on the plans, a pothole shall have a maximum length of six (6) feet, maximum depth as indicated on the plans or as directed by the Engineer, and the width dimension shall be as required by the Contractor with authorization of the Engineer.
The Contractor will protect and assume liability for all existing or newly installed structures and lines from damage by Contractor’s forces during the construction period from the date of Notice to Proceed and the date of Final Acceptance.
All repairs of apparent or discovered utility facilities will be accomplished by the respective utility owners. The Contractor must coordinate with the utility companies to rewrap and/or repair their utility. All exposed existing telephone, gas, water, electrical and other public utility facilities will receive an envelope of twelve-inches (12”) of sand.
All painted markings including USA and CBUD markings, marks placed by the Contractor, and marks placed by the City’s survey crew on street pavement, curbs, gutters and sidewalks shall be completely removed by the Contractor prior to completion of the project. All cost incurred to complete this work shall be deemed included in other items of work and no additional payment will be made thereof.
20. UTILITY COORDINATION
Existing utilities shown on the plans are for information only and their locations are approximate. The Contractor shall assume full responsibility for the location of all existing utilities, whether or not shown on the plans, prior to the commencement of any construction activity (e.g., excavation, clearing & grubbing, etc.) which may damage any
7.j.2
Packet Pg. 335 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-13 Project No. C9823
existing utilities. Furthermore, the Contractor shall protect and assume liability for all existing utilities, whether or not shown on the plans, and any newly installed structures and lines from damage by contractor’s forces for the duration of the construction period (from the date of Notice to Proceed until the date of Final Acceptance).
21. NOTIFICATION OF RESIDENTS AND MERCHANTS
The Contractor shall perform the following tasks prior to commencement of the work:
A. Prepare and leave at each location a notification letter for access to sewer easements seventy-two (72) hours prior to the time of access to the property, stating nature of work, service interruption, and expected duration of cleaning and inspection activity affecting their property.
B. Include Contractor's telephone number for the purpose of taking inquiries and complaints.
C. Submit a draft copy of the notification letter to City at Pre-Construction conference. The final format and wording of this letter shall be subject to approval of City.
If Contractor encounters any difficulty in obtaining resident’s or business manager’s permission to access the easement in order to perform the inspection, then Contractor shall contact the City for assistance. In such cases, Contractor shall provide a minimum of two weeks’ notice to the City prior to the need to access private property. Contractor is responsible for scheduling work such that this two-week notification period does not interfere with the overall work schedule.
22. CONSTRUCTION SCHEDULE
The Contractor shall submit to the Engineer, for review, a construction schedule in Critical Path Method (CPM) format with accompanying bar chart setting forth the sequence in which construction will proceed. In addition, the Contractor shall submit an updated CPM schedule for review along with the monthly request for partial payment.
The City may, at its sole discretion, withhold partial payment until an updated CPM schedule is submitted.
23. DAILY WORK REPORTS
The Contractor shall provide the City Inspector with daily work reports at the beginning of each working day for a report of the previous working day. The form shall conform to that which is provided in Appendix A.
24. SUBMITTALS
The Contractor shall provide one electronic copy in PDF format of the construction submittals. Each submittal shall be numbered. Re-submittals shall include the original submittal number followed by a letter indicating the revision (i.e. “A” for the first revision, “B” for the second revision). Submittals shall be provided as required by the Contract Documents. The Contractor shall be responsible for conforming to the requirements of the specifications. The Contractor shall provide, at a minimum, the following submittals to the City within twenty (20) calendar days after the issuance of the Award of
7.j.2
Packet Pg. 336 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-14 Project No. C9823
Contract Notification Letter and prior to beginning work.
Each submittal item shall include a signed cover sheet. The cover sheet shall be filled out completely and legibly.
Material Submittal List. – The names of the manufacturers/producers of the materials proposed by the Contractor for use under this contract shall be submitted to the Engineer, for review prior to beginning of work. The manufacturer's/ producer’s, materials, test results, specifications and/or certificates of compliance shall be submitted for all applicable products on the list, and shall be dated no earlier than six months from the award date.
25. INSURANCE AND INDEMNIFICATION
Insurance.
(1) All required insurance must be provided in the form of “occurrence” type policies underwritten by admitted insurers in the State of California with a rating of A or better from the current year Best Rating Guide. All policies must be issued at the expense of the Contractor and must be maintained at the Contractor’s expense throughout the performance of the Work. (2) The Contractor and any subcontractors engaged in performance of the Work must secure workers compensation coverage in accordance with California Labor Code Section 3700 and other applicable law. The Contractor must verify that all Subcontractors comply with this requirement.
(3) Within ten (10) Working Days following notice concerning the award the Contractor must submit to the City along with executed copies of all other documents specified in the Contract Check List certificates of insurance, declarations page(s) and endorsements evidencing that the Contractor has in effect and will maintain throughout the performance of the Work the following kinds and amounts of insurance:
a. Worker’s Compensation Insurance. Workers Compensation and Employers Liability insurance as required by any applicable law, regulation or statute, including the provisions of Division IV of the Labor Code of the State of California, and any act or acts amending it. Worker's compensation insurance must be for Statutory Limits and must cover the full liability of the Contractor. The Contractor’s Employer’s Liability Insurance must be in an amount no less than statutory minimum.
The workers’ compensation policy is to be endorsed with a waiver of subrogation. The insurance company, in its endorsement, must agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses paid under the terms of such policy.
7.j.2
Packet Pg. 337 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-15 Project No. C9823
b. Commercial General Liability and Automobile Liability Insurance. Coverage for liability because of Bodily Injury and property Damage including, but not limited to the following coverage:
1. Completed and On-going Operations and Products Liability;
2. Bodily Injury;
3. Personal Injury;
4. Broad Form Property Damage Liability;
5. Contractual Liability insuring the obligations assumed by the Contractor under the Contract Documents;
6. Automobile Liability, including owned, non-owned and hired automobiles; and
7. Coverage for the XCU hazards of Explosion, Collapse and Underground.
c. Commercial Umbrella/Excess Policy. The Umbrella/Excess policy is to insure losses above General liability, Employers liability, and auto liability limits. The following referenced limits for the General and Auto liability may also be satisfied with a Commercial Umbrella/Excess policy. If the Commercial Umbrella/Excess Policy is used to meet the requirement limits of the General and Auto liability policies the aggregate and occurrence limit must reflect the required coverage limits for Auto and General liability plus the Commercial Umbrella/Excess Policy requirement of $5,000,000. If a Commercial Excess Policy is used to satisfy the requirements, then an email or language stating as such on the certificate must be provided from the insurance carrier/broker that Excess Policy ‘follows form’ or is ‘continuous’ to the General liability and/ Auto liability policy. d. Builder’s Risk Insurance. Insurance for all real and personal property owned by the City, including improvements and
betterments, and providing no less than the following minimum terms, coverage extensions and conditions:
1. Builder’s Risk coverage shall be provided on a “Special Risk” basis, including Earthquake in an amount which is not less than 100% of the replacement cost of the Project;
2. Real and personal property to be insured hereunder shall include property owned by contractors during the course of construction and intended for permanent installation in the Project;
3. Perils insured against shall be at least as broad as those included in Insurance Services Organization (“ISO”) Special Form (CP 10 30 10 00).
7.j.2
Packet Pg. 338 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-16 Project No. C9823
4. With coinsurance waived, or the policy shall contain an agreed amount endorsement acceptable to the City;
e. Ordinance or Law insurance (Building Laws Insurance) consisting of coverage for:
1. Demolition;
2. Increased Cost of Construction;
3. Contingent Coverage for the Operation of Building Laws insuring the value of the undamaged portion of the premises; and
4. “Increased Time to Rebuild” during the period of time when the policy’s period of recovery has been extended because of requirements to bring the Project into compliance with current building laws and codes.
f. Debris Removal Insurance. With respect to vacancy of any Improvements, the policy may contain standard limitations of coverage, but, only after the Improvements have been vacant for a period as specified. Additionally, the policy shall not contain any limitations or coverage reductions for unoccupancy of any portions of the Improvements;
g. Extra Expense Insurance. Coverage shall be provided for consequential losses not directly caused by damage to property but which arise as a result of damage to the Project by an insured peril, commonly referred to as “soft costs” coverage, as follows:
1. Additional interest on money borrowed to finance construction or repair;
2. Additional architect, engineering, consulting, legal and accounting fees;
3. Additional insurance premiums; and
4. Extra costs incurred to continue construction and meet contract dates.
h. Equipment Breakdown Insurance.
1. Unscheduled location coverage for temporary, offsite storage of building materials, fixtures, machinery & equipment, and appliances awaiting installation; and
2. Coverage for property in transit.
(4) Coverage shall be amended to allow for partial occupancy of the Project prior to completion, and preserve coverage until acceptance of the
7.j.2
Packet Pg. 339 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-17 Project No. C9823
Project, in the event portions of the Project can be made available for occupancy in the final stages of the Project.
(5) All insurance furnished by the Contractor must be primary in the amount of any loss.
(6) Standard City insurance forms will be provided to the Contractor. If the Contractor’s insurance carrier chooses to use forms other than standard forms provided by the City, such forms shall be subject to the prior approval of the City, which approval shall not be unreasonably withheld.
Contractor's failure to provide insurance forms that are acceptable to the City within ten (10) calendar days of notice of award of contract shall:
a. Constitute a failure to complete the "Contract
Documents Checklist"
b. Entitle the City to rescind any contract award, and
c. Result in a forfeiture of Contractor's bid bond or other form of bid security.
Endorsements. No endorsement may be attached limiting the coverage. The City will not accept the following endorsement forms: CG 07 04 forms (i.e.- CG 24 26 07 04 or CG 2010 0704 etc.) and the CG 20 09 form.
Schedule of Required Limits of Insurance. Contractor shall obtain and maintain, the following types of insurance identifying the City as the Named Insured. Each insurance coverage described in this Section shall provide terms as indicated, with a minimum limit of protection as specified in this Schedule of Required Limits of Insurance:
a. Comprehensive General Liability:
(1) Bodily Injury Liability: $5,000,000 each
occurrence, $5,000,000 each aggregate
(2) Property Damage Liability: $5,000,000 each
occurrence, $5,000,000 each aggregate
b. Comprehensive Automobile Liability
(1) Bodily Injury/Property Damage, Liability $5,000,000 combined single limit
c. Commercial Umbrella/Excess: $5,000,000 Policy
d. Builder’s Risk Insurance: All Hard Costs
e. Ordinance (or Law) Insurance: Coverage to be
included
f. Debris Removal Insurance: $750,000
7.j.2
Packet Pg. 340 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-18 Project No. C9823
g. Extra Expense Insurance: All Soft Costs
h. Equipment Breakdown Insurance: Coverage to be
included
i. Pollution Legal Liability: $2,000,000 per occurrence and $4,000,000 per aggregate
For each insurance policy required under the Contract (except for the required workers compensation insurance policy) the Contractor must provide endorsements that add the City, its Board, officers, employees, volunteers and agents as an additional insured. Such endorsements must: provide that the insurance required to be furnished by the Contractor will be primary as regards the City, and that the City’s insurance will be excess of and not contribute to the insurance required to be furnished by the Contractor; that the City will receive 30 day written notice of any reduction or cancellation of such insurance required to be furnished by the Contractor; and include a severability of interest clause acceptable to the City. Said endorsement must be at least as broad as Insurance Services Office form number CG2010 (Ed. 11/85).
Waiver of Subrogation. Contractor agrees to waive subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all work performed by Contractor, its employees, agents and subcontractors.
Indemnities.
(1) The Contractor will take all responsibility for the Work, and will bear all losses and damages directly or indirectly resulting to the Contractor, any subcontractors engaged in performance of the Work, the City, its officials, officers, employees, agents, volunteers and consultants, and to third parties on account of the performance or character of the Work, unforeseen difficulties, accidents, or occurrences of other causes predicated on active or passive negligence of the Contractor or of any subcontractor engaged in performance of the Work. To the fullest extent permitted by law the Contractor will indemnify, defend and hold harmless the City, its officials, officers, employees, agents, volunteers and consultants from and against any or all loss, liability, expense, claims, costs (including costs of defense), suits, and damages of every kind, nature and description (including, but not limited to, penalties resulting from exposure to hazards in violation of the California Labor Code) directly or indirectly arising from the performance of the Work (“Claims”). (2) The Contractor will indemnify, defend and hold harmless the City, the City’s officials, officers, employees, volunteers, agents and the Project Manager and the Architect for all liability on account of any patent rights, copyrights, trade names or other intellectual property rights that may apply to the Contractor’s performance of the Work. The Contractor will pay all royalties or other charges as a result of intellectual property rights that may apply to methods, types of construction, processes, materials, or
7.j.2
Packet Pg. 341 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-19 Project No. C9823
equipment used in the performance of the Work, and will furnish written assurance satisfactory to the City that any such charges have been paid. (3) The Contractor assumes all liability for any accident or accidents resulting to any person or property as a result of inadequate protective devices for the prevention of accidents in connection with the performance of the Work. The Contractor will indemnify, defend, and hold harmless the City and its officials, officers, employees, agents, volunteers and consultants from such liability.
(4) Approval of the Contractor’s certificates of insurance and/or endorsements does not relieve the Contractor of liability under these General Provisions. The Contractor will defend, with legal counsel reasonably acceptable to the City, any action or actions filed in connection with any Claims and will pay all related costs and expenses, including attorney's fees incurred. The Contractor will promptly pay any judgment rendered against the City, its officials, officers, employees, agents, volunteers or consultants for any Claims. In the event the City, its officials, officers, employees, agents, volunteers or consultants is made a party to any action or proceeding filed or prosecuted against Contractor for any Claims, Contractor agrees to pay the, its officials, officers, employees, agents, volunteers and consultants any and all costs and expenses incurred in such action or proceeding, including but not limited to, reasonable attorneys' fees.
(5) Subject to the requirements of these General Provisions, the Contractor will indemnify, hold harmless and defend with legal counsel reasonably acceptable to the City, the City and its officials, officers, employees, agents and volunteers from and against any and all Claims related to damage to surface or underground facilities caused by the Contractor or any of the Contractor’s privities or agents.
(6) The Contractor will indemnify, hold harmless and defend with legal counsel reasonably acceptable to the City, the City and its officials, officers, employees, agents and volunteers from and against any and all Claims, including any fines or other penalties, related to failure of the Contractor and/or privities or agents of the Contractor to comply with the requirements of the General Permit, or to implement the SWPPP in accordance with these General Provisions. The City may withhold from amounts due or that may become due the Contractor under this Contract amounts that equal or are estimated to equal the amount of Claims, including fines, resulting from failure of the Contractor and/or privities or agents of the Contractor to comply with the requirements of the General Permit, or to implement the SWPPP in accordance with provision 12.4 of these General Provisions.
In accordance with California Civil Code Section 2782(a), nothing in the Contract will be construed to indemnify the City for its sole negligence, willful misconduct, or for defects in design furnished by City. In accordance with California Civil Code Section 2782(b), nothing in the Contract will be construed to impose on the Contractor or to relieve the City from liability for the City’s active negligence. By execution of the
7.j.2
Packet Pg. 342 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-20 Project No. C9823
Contract Documents the Contractor acknowledges and agrees that the Contractor has read and understands the insurance and indemnity requirements of the Contract Documents, which are material elements of consideration.
26. CONSTRUCTION SITE TRAILERS
Contractor is responsible for providing one or more onsite construction trailers for their Superintendent and one construction trailer for the City’s Inspector of Record for the duration of the Project. Contractor shall make all provisions and pay all installation, ongoing and all other associated costs for the offices including but not limited to service fees for internet, power, and water along with any costs to comply with local code and OSHA requirements.
The construction trailer for the Inspector of Record shall include a weather tight 8ft x 24ft trailer “ModSpace HQ” Office Trailer model, or equal, with HVAC, lighting, electrical outlets, and communications capabilities.
The Contractor shall provide the following listed items in good condition for the inspector’s field office for the City’s sole use:
x Two (2) standard five (5) feet office desk with not less than three drawers; x One (1) plan-viewing table top; thirty-six (36) inches high and no less than four (4) feet wide;
x One (1) file cabinet, legal size, four drawer with lock and three keys, double suspension, complete Pendaflex suspension racks for each drawer, and must be fire resistant;
x Two (2) office chairs, standard arm rest-type, adjustable swivel tilt-back with casters;
x One (1) six (6) foot conference table with right (8) standard arm rest chairs, adjustable swivel tilt-back on casters;
x Two (2) waste baskets;
x One (1) half-size refrigerator;
x One (1) coffee maker;
x One (1) microwave;
x Two (2) four (4) foot white boards;
x One (1) office copy/scan/fax/print machine for the Inspector’s field office.
Copy/scan/fax/print machine shall be a HP Laserjet Pro 100 MFP M175nw Network-Ready Wireless Color All-In-One Printer, or equal. Contractor shall provide ink cartridges and paper as needed; and
x The Contractor shall provide for the continuous use of the Inspectors network capability between Inspector’s laptop and the copy/scan/fax/print machine, and DSL/Wi-Fi internet access.
Contractor shall obtain and pay for a service contract for all on-site services and repair for all items listed above, to run the full duration of the project. If any equipment becomes non-operational, Contractor shall be responsible for repairing it within fortyeight (48) hours. If Contractor fails to perform the requested repairs after being provided written notice the City can have the repairs performed and the cost of the repairs will
7.j.2
Packet Pg. 343 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Special Provisions Fire Station No. 16 Replacement Project Page SP-21 Project No. C9823
either be reimbursed by the Contractor or deducted from the contract. The method of reimbursement shall be decided by the City.
Cost of use permits, occupancy permits and related fees, if any required by Governing Authorities for temporary construction facilities shall be obtained by and paid by Contractor.
Provide property insurance and protection for temporary facilities.
7.j.2
Packet Pg. 344 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs)
PROJECT MANUAL
INCLUDING SPECIFICATIONS
FOR
CONSTRUCTION
FOR THE
SAN CARLOS
FIRE STATION 16
1280 Alameda de las Pulgas
San Carlos, CA 94070
ARCHITECTS
SHAH KAWASAKI ARCHITECTS
570 10th Street, #201
Oakland, CA 94607
T: 510.663.6090
May 2021
7.j.2
Packet Pg. 345 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) San Carlos Fire Station 16 (19716) 1 SEALS PAGE
SAN CARLOS FIRE STATION 16
CITY OF SAN CARLOS (19716)
MAY 2021
Divisions 00, 01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12, 14, 21, 22, 23, 26, 27, 28, 31, 32, 33, and 48 of the Specifications herein have been prepared by, or under the direction of, the following licensed professional:
Architect:
Shah Kawasaki Architects
570 10th Street, Suite 201
Oakland, CA 94607
Phone: 510.663.6090
Alan Kawasaki
License: C13476
Expires: 02/28/2021
7.j.2
Packet Pg. 346 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) Academy of Alameda Play Structure (20704) 1 SEALS PAGE
SAN CARLOS FIRE STATION 16
CITY OF SAN CARLOS (19716)
MAY 2021
Divisions 01, 02, 31, 32, and 33 of the Specifications herein have been prepared by, or under the direction of, the following licensed professional:
Civil Engineer:
Siegfried Engineering
3428 Brookside Road
Stockton, CA 95219
Phone: 209.943.2021
Paul Schneider
License: C62498
Expires: 09/30/2021
7.j.2
Packet Pg. 347 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) San Carlos Fire Station 16 (19716) 1 SEALS PAGE
SAN CARLOS FIRE STATION 16
CITY OF SAN CARLOS (19716)
MAY 2021
Divisions 82, 86 of the Specifications herein have been prepared by, or under the direction of, the following licensed professional:
Engineer:
Kimley-Horn & Associates
46373 Chabot Dr, Suite 300
Pleasanton, CA 94588
Phone: 925.398.4865
Nikita Petrov
License: C80570
Expires: 03/31/2023
7.j.2
Packet Pg. 348 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) San Carlos Fire Station 16 (19716) 1 SEALS PAGE
SAN CARLOS FIRE STATION 16
CITY OF SAN CARLOS (19716)
MAY 2021
Divisions 03 1000, 03 2000, 03 3000, 05 1100, 06 1000, 06 1733, 06 1800 of the Specifications herein have been prepared by, or under the direction of, the following licensed professional:
Structural Engineer:
ZFA Structural Engineers
1212 4th Street, Suite Z
Santa Rosa, CA 95404
Phone: 707.526.0992
Luke Wilson
License: SE 5933
Expires: 12/31/2021
04/16/2021
7.j.2
Packet Pg. 349 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) San Carlos Fire Station 16 (19716) 1 SEALS PAGE
SAN CARLOS FIRE STATION 16
CITY OF SAN CARLOS (19716)
MAY 2021
Divisions 21, 22 and 23 of the Specifications herein have been prepared by, or under the direction of, the following licensed professional:
Mechanical Engineer:
3C Engineering, Inc.
1500 Palm Street
San Luis Obispo, CA 93401
Phone: 805.540.3363
Brian Starrett
License: M34068
Expires: 06/30/2022
7.j.2
Packet Pg. 350 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) ^ĂŶĂƌůŽƐ&ŝƌĞ^ƚĂƚŝŽŶϭϲ;ϭϵϳϭϲͿ ϭ ^
>^W'
6$1&$5/26),5(67$7,21
&,7<2)6$1&$5/26
0$<
'LYLVLRQVDQGRIWKH6SHFLILFDWLRQVKHUHLQKDYHEHHQSUHSDUHGE\RU XQGHUWKHGLUHFWLRQRIWKHIROORZLQJOLFHQVHGSURIHVVLRQDO
(OHFWULFDO(QJLQHHU
7KRPD(QJLQHHULQJ7KRPD(OHFWULF,QF
(PSOHR6W
6DQ/XLV2ELVSR&$
3KRQH
:LOOLDP$7KRPD
/LFHQVH
([SLUHV
7.j.2
Packet Pg. 351 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
00 01 10 - 1 Table of Contents
SECTION 00 01 10
TABLE OF CONTENTS
PROJECT MANUAL
INTRODUCTORY INFORMATION
Document 00 01 05 Seals Page
00 01 10 Table of Contents
BIDDING INFORMATION
By Owner
CONTRACTING REQUIREMENTS
By Owner
SPECIFICATIONS GROUP
DIVISION 01 – GENERAL REQUIREMENTS
Section 01 11 00 Summary of Work
01 23 00 Alternates
01 25 00 Substitution Procedures
01 30 00 Administrative Requirements
01 31 00 Project Management and Coordination
01 35 15 CALGreen Environmental Requirements
01 40 00 Quality Requirements
01 50 00 Temporary Facilities and Controls
01 57 23 Temporary Erosion and Sediment Control
01 60 00 Product Requirements
01 70 00 Execution Requirements
01 73 00 Cutting and Patching
01 74 10 Waste Management
01 77 00 Closeout Procedures
01 78 00 Warranties
01 79 00 Demonstration and Training
DIVISION 02 – EXISTING CONDITIONS
Section 02 41 10 Structure Demolition
02 41 13 Selective Site Demolition
DIVISION 03 – CONCRETE
Section 03 10 00 Concrete Forming and Accessories
03 20 00 Concrete Reinforcing
03 30 00 Cast-In-Place Concrete
03 35 50 Polished Concrete Flooring
7.j.2
Packet Pg. 352 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
00 01 10 - 2 Table of Contents
DIVISION 04 – MASONRY
Section 04 21 00 Non-Load Bearing Brick Masonry
04 22 00 Concrete Unit Masonry
DIVISION 05 – METALS
Section 05 11 00 Structural and Miscellaneous Steel
05 50 00 Metal Fabrications
05 51 00 Metal Stairs
05 70 00 Decorative Metals
05 75 00 Fire Poles
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Section 06 10 00 Rough Carpentry
06 17 33 Wood I-Joists
06 18 00 Glue Laminated Construction
06 20 00 Finish Carpentry
06 40 00 Architectural Woodwork
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 13 00 Sheet Waterproofing
07 19 00 Water Repellent
07 21 00 Thermal Insulation
07 26 00 Below-Grade Vapor Retarder
07 28 00 Weather Barrier Underlayment
07 41 10 Corrugated Metal Roof Panels
07 41 15 Manufactured Standing Seam Roofing
07 42 25 Metal Wall Panels
07 42 45 Composite Metal Building Panels
07 42 90 Acoustic Panel Generator Screen
07 46 20 Wood Board Soffits
07 60 00 Flashing and Sheet Metal
07 84 00 Firestopping
07 90 00 Joint Sealants
DIVISION 08 – OPENINGS
Section 08 11 10 Hollow Metal Doors and Frames
08 11 20 Interior Aluminum Frames
08 14 00 Wood Doors
08 31 00 Access Doors and Panels
08 35 70 Four-Fold Metal and Glass Doors
08 36 10 Aluminum and Glass Sectional Doors
08 41 00 Entrances and Storefronts
08 71 00 Door Hardware (By others)
08 71 15 Low Energy Door Operators
08 80 00 Glazing
08 83 00 Frameless Mirrors
08 91 00 Louvers
7.j.2
Packet Pg. 353 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
00 01 10 - 3 Table of Contents
DIVISION 09 – FINISHES
Section 09 21 00 Gypsum Board Assemblies
09 30 00 Tiling
09 51 00 Acoustical Ceilings
09 65 10 Resilient Base
09 65 15 Resilient Stair Accessories
09 65 40 Linoleum Sheet Flooring
09 65 65 Resilient Athletic Flooring
09 66 20 Resinous terrazzo Flooring
09 68 10 Tile Carpeting
09 77 30 Fiberglass Wall Panels
09 90 00 Painting and Coating
09 96 70 High Performance Coating
DIVISION 10 – SPECIALTIES
Section 10 14 00 Signage
10 21 35 Solid Polymer Shower Wall Panels
10 26 10 Stainless Steel Corner Guards
10 26 20 Protective Wall Covering
10 28 10 Toilet and Bath Accessories
10 28 25 All-Glass Shower Doors
10 44 00 Fire Extinguisher Cabinets
10 51 05 Fire Station Wire Lockers
10 55 00 Locking Mailbox
10 75 00 Metal Flagpoles
DIVISION 11 – EQUIPMENT
Section 11 31 00 Residential Appliances
DIVISION 12 – FURNISHINGS
Section 12 24 00 Window Shades
12 48 00 Entry Floor Mats
12 48 10 Recessed Entry Floor Mats
12 93 50 Bicycle Racks
DIVISION 13 – SPECIAL CONSTRUCTION
Not used.
DIVISION 14 – CONVEYING EQUIPMENT
Section 14 42 10 Enclosed LULA Wheelchair Lift
DIVISION 21 – FIRE SUPPRESSION
Section 21 10 00 Fire Suppression System
7.j.2
Packet Pg. 354 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
00 01 10 - 4 Table of Contents
DIVISION 22 – PLUMBING
Section 22 00 00 Plumbing
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING
Section 23 00 00 Heating, Ventilation and Air Conditioning 23 00 13 General Mechanical Requirements
23 25 16 Vehicle Tailpipe Exhaust
DIVISION 26 – ELECTRICAL
Section 26 05 00 Common Work Results for Electrical
26 05 19 Low Voltage Electrical Power Conductors
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Supports for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 46.13 Electric Utility Systems
26 05 46.16 Telephone Utility Services
26 05 46.19 Cable Television (CATV) Utility Systems
26 05 48 Vibration and Seismic Controls for Electrical Systems 26 05 53 Identification of Electrical Systems
26 05 73 Overcurrent Protective Device Coordination
26 08 10 Electrical Acceptance Testing
26 09 00 Controls and Instrumentation
26 24 13 Service and Distribution Switchboard
26 24 16 Panelboards
26 27 26 Wiring Devices
26 28 16 Enclosed Switches and Circuit Boards
26 32 13 Generator System
26 36 23 Automatic Transfer Switches
26 43 00 Surge Protection Devices
26 51 00 Interior Lighting
26 56 00 Exterior Lighting
26 56 70 Lighting Acceptance Testing
26 91 15 Electrical Commissioning Requirements
DIVISION 27 – COMMUNICATIONS
Section 27 13 00 Intercommunication Systems
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Section 28 13 00 Electrical Access Control
28 31 00 Fire Sprinkler Monitoring and System
DIVISION 31 – EARTHWORK
Section 31 10 00 Clearing and Grubbing
31 20 00 Earthwork
31 22 19 Finish Grading
31 23 33 Trenching and Backfilling
7.j.2
Packet Pg. 355 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
00 01 10 - 5 Table of Contents
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 32 11 23 Aggregate Base Courses
32 12 16 Asphalt Paving
32 13 13 Cast-In-Place Concrete
32 14 13 Pavers
32 19 00 Fire Station Warning System and Rectangular Rapid Flashing Beacon System
32 20 00 Traffic Signs
32 31 20 Decorative Metal Fences and Gates
32 84 00 Landscape Irrigation
32 90 00 Planting
32 98 00 Landscape Maintenance
DIVISION 33 –UTILITIES
Section 33 05 26 Utility Line Signs, Markers and Flags
33 11 00 Water Utility Distribution Piping
33 31 00 Sanitary Utility Sewerage Piping
33 39 16 Sand/ Oil Separator
33 39 23 Sanitary Utility Sewerage Piping
33 41 00 Storm Utility Drainage Piping
DIVISION 48 – ELECTRICAL POWER GENERATION
Section 48 41 00 Solar PV System Design Build Criteria.
END OF SECTION
7.j.2
Packet Pg. 356 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 11 00 - 1 Summary of Work
SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Project consists of construction of the San Carlos Fire Station 16, 1280 Alameda de las Pulgas, San Carlos, California 94070, as indicated in Contract Documents.
1. Items noted "NIC" (Not in Contract) will be furnished and installed by City or under separate contract.
B. Division 01: Where provisions of General Conditions relate to Project administration or work-related requirements of the Contract, those paragraphs are expanded in Division 01 - General Requirements.
1. General Conditions, Supplementary Conditions and Division 01 - General Requirements contain information necessary for completion of every part of Project.
2. Where items of Work are done under subcontracts, each item shall be subject to these conditions.
1.2 REQUIREMENTS INCLUDED
A. This section includes administrative provisions:
1. Work sequence.
2. Contractors use of premises.
3. Field engineering.
4. Regulatory requirements and reference standards.
5. City furnished Contractor installed (OFCI) products.
6. Special definitions.
1.3 WORK SEQUENCE
A. Coordinate construction schedule and operations with City and Construction Manager.
1.4 CONTRACTORS USE OF PREMISES
A. Limit use of premises for Work and construction operations and to allow for work by other contractors.
B. Coordinate use of premises and access to site under direction of City or Construction Manager.
7.j.2
Packet Pg. 357 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 11 00 - 2 Summary of Work
1.1 FIELD ENGINEERING
A. Provide field engineering services; establish lines and levels by use of recognized engineering survey practices.
B. Locate and protect control and reference points.
1.2 REGULATORY REQUIREMENTS AND REFERENCE STANDARDS
A. Regulatory Requirements:
1. Architect has contacted governing authorities and reviewed design requirements of local, state, and federal agencies for applicability to Project.
2. Contractor shall be responsible for contacting governing authorities directly for necessary information and decisions bearing upon performance of Work.
B. Reference Standards:
1. For Products specified by association or trade standards, comply with requirements of referenced standard, except when more rigid requirements are specified or are required by applicable codes.
2. Applicable date of each standard is that in effect as of date on proposal or date on Contract where no proposal is available, except when a specific date is specified.
1.3 CITY FURNISHED CONTRACTOR INSTALLED (OFCI) PRODUCTS A. Select products are to be furnished and paid for by City and installed by Contractor:
1. Refer to Drawings and Specifications.
B. City's Responsibilities:
1. Arrange for and deliver shop drawings, product data, and samples to Contractor.
2. Arrange and pay for product delivery to site.
3. Inspect products jointly with Contractor on delivery.
4. Submit claims for transportation damage.
5. Arrange for replacement of damaged, defective, or missing items.
6. Arrange for manufacturer's warranties, inspections, and service.
C. Contractor's Responsibilities:
1. Review shop drawings, product data, and samples.
2. Receive and unload products at site.
3. Inspect jointly with City for completeness and damage.
4. Handle, store, and install products.
5. Finish products as required after installation.
6. Repair or replace items damaged by Work of this Contract.
1.4 SPECIAL DEFINITIONS
A. Approved: Approved, directed, selected, required, ordered, designated, accepted, acceptable, and satisfactory shall require written action by Architect.
7.j.2
Packet Pg. 358 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 11 00 - 3 Summary of Work
B. Equal, or Approved Equal: Equal and approved equal shall require requests for substitutions for products or manufacturers not specified.
1. Requests for substitutions shall be in accordance with requirements of Section 01 25 00 - Substitution Procedures.
C. Furnish: Furnish means supply and deliver to Project, unless otherwise defined in greater detail.
D. Install: Install is used to describe operations at Project, from inspecting and unloading, to completion in place, ready for intended use.
E. Provide: Provide means furnish and install, complete and ready for intended use, unless otherwise defined in greater detail.
END OF SECTION
7.j.2
Packet Pg. 359 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 23 00 - 1 Alternates
SECTION 01 23 00
ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes a description of alternate work.
B. Related Requirements:
1. Pricing Documents: Quotation of cost of each alternate.
2. City-Contractor Agreement: Alternates accepted by City for incorporation into the Work.
3. Sections of Specifications identified in each Alternate.
1.2 PROCEDURES
A. Alternates will be exercised at City's option.
B. Coordinate Related Work: and modify surrounding work as required to complete Work, including changes under each alternate, when acceptance is designated in City-Contractor Agreement.
1.3 ALTERNATES
A. Alternates: To be determined.
END OF SECTION
7.j.2
Packet Pg. 360 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 25 00 - 1 Substitution Procedures
SECTION 01 25 00
SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. General: Procedures are described for requesting substitution of unlisted materials in lieu of materials named in Specifications or approved for use in addenda.
1. Provide products listed in Contract Documents, products by manufacturers listed in Contract Documents, and products meeting specified requirements. a. Contract Amount: Base on materials and products included in Contract Documents.
b. Where materials and products are listed in Contract Documents, materials and products by manufacturers not listed shall not be used without City’s and Architect’s approval of Contractor's written request for substitution.
2. Purpose: After bidding, substitutions will only be considered where City will receive benefit or because specified materials are no longer available due to no fault of Contractor.
a. City benefits either from a Contractor proposed reduction of the Contract amount or from a reduction in Contract time based on acceptance of proposed substitution.
b. List proposed cost or time reductions on request for substitution. c. Requests not including a proposed cost or time reduction will not be considered unless Contractor submits supporting information indicating specified materials are not available.
B. Related Sections:
1. Section 01 60 00: Product requirements.
1.2 SUBSTITUTIONS
A. Within a period of 35 days after award of Contract, City and Construction Manager will consider formal requests for substitutions only from Contractor as specified in 1.1 Summary.
1. City and Construction Manager will consider only one request for substitution for each material; where requests are denied Contractor shall be required to provide specified materials.
2. After initial 35-day period, requests will be considered only when a product becomes unavailable through no fault of Contractor; more than one request for substitution will be considered if necessary.
7.j.2
Packet Pg. 361 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 25 00 - 2 Substitution Procedures
B. Submit each request with sequentially numbered “Substitution Request Transmittal” acceptable to City and Construction Manager; submit separate request for each product and support each request with:
1. Product identification with manufacturer's literature and samples where applicable.
2. Name and address of similar projects on which product has been used, and date of installation.
C. Submit itemized comparison of proposed substitution with product specified and list significant variations.
D. Submit data relating to changes in construction schedule.
E. Note effect of substitution on other work, products, or separate contracts.
1. Note if acceptance of substitution could require revision of Contract Documents, Drawings, details or Specifications.
F. Include accurate cost data comparing proposed substitution with product and amount of net change in Contract price.
1. Include costs to other contractors and costs for revisions to Drawings, details or Specifications.
G. Substitutions will not be considered for acceptance when:
1. They are indicated or implied on submittals without a formal request from Contractor.
2. They are requested directly by a subcontractor or supplier.
3. Acceptance will require substantial revision of Contract Documents.
H. Substitute products shall not be ordered without written acceptance of City and Construction Manager.
I. City and Construction Manager will determine acceptability of proposed substitutions and reserves right to reject proposals due to insufficient information.
1.3 CONTRACTOR'S REPRESENTATION
A. Requests constitute a representation that Contractor:
1. Has investigated proposed product and determined it meets or exceeds, in all respects, specified product.
2. Will provide same warranty or longer warranty for substitution as for specified product.
3. Will coordinate installation and make other changes that may be required for Work to be complete in all respects.
4. Waives claims for additional costs that subsequently become apparent.
5. Will pay costs of changes to Contract Documents, Drawings, details and Specifications required by accepted substitutions.
7.j.2
Packet Pg. 362 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 25 00 - 3 Substitution Procedures
1.4 CONSTRUCTION MANAGER'S DUTIES
A. Review Contractor's requests for substitutions with reasonable promptness.
1. Construction Manager will recommend that City accept or reject substitution request.
2. Upon request, Architect will provide cost for changes to Contract Documents, Drawings, details and Specifications required for substitutions.
B. Notify Contractor in writing of decision to accept or reject requested substitution.
END OF SECTION
ATTACHMENT: REFER TO ATTACHED PRODUCT SUBSTITUTIONS FORM.
7.j.2
Packet Pg. 363 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 25 00 - 4 Substitution Procedures
MATERIAL/PRODUCT SUBSTITUTION REQUEST
To: Shah Kawasaki Architects
Project Name: __________________________________________________________ Request Number: __________________________________________________________ A. We hereby submit for your consideration the following product instead of the specified item:
1. Section ______________ Sub-Article _________________________________
2. Specified Item ____________________________________________________
3. Proposed Substitution (Manuf., Type, Model, etc.)________________________ ________________________________________________________________ B. Complete following:
1. We propose to provide City cost credit (including costs for changes by other trades) of ________________________________________________________________
2. Does this substitution offer earlier delivery or less construction time? Yes No a. If yes, how much and why? ______________________ (hours/days/weeks)
3. How does this substitution affect any dimensions, layout, or details of other trades as shown on Drawings?
4. Has this substitution been coordinated with remainder of Project?
5. What are the specific differences between this substitution and specified item? ________________________________________________________________ ________________________________________________________________
6. What impact does this product have on LEED requirements? ________________________________________________________________ C. Attach following items as applicable. Check if attached.
1. Manufacturers’ technical data. ___
2. Laboratory test or performance results. ___
3. Drawings and wiring diagrams of proposed product. ___
4. Drawings and description of changes required by other trades. ___
5. Samples. ___
6. Manufacturer’s guarantee and maintenance instructions. ___
7. LEED submittal information. ___
D. The undersigned agrees to pay for all design, testing, changes in Contract Documents, and construction as result of acceptance of this substitution, at no additional cost to City.
E. Submitted by (Firm) ___________________________________________________ Signature ________________________________________ Date _______________
7.j.2
Packet Pg. 364 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 30 00 - 1 Administrative Requirements
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. This section describes general procedural requirements for ongoing submittals.
1. Construction progress schedules.
2. Schedule of values.
3. Product data and manufacturer’s literature.
4. Shop drawings.
5. Samples.
6. Manufacturers' certificates.
7. Excess materials and attic stock.
8. Design build (delegated design) procedures.
B. Related Requirements:
1. Section 01 40 00: Test reports, manufacturer's field reports, and mock-ups.
2. Section 01 70 00: Manufacturers’ instructions.
3. Section 01 77 00: Closeout requirements including Project Record Documents.
4. Section 01 78 00: Warranties.
1.2 GENERAL SUBMITTAL PROCEDURES
A. Submittals: Transmit each item using form approved by City; submit sample to Architect for approval prior to use.
1. Identify Project, Contractor, subcontractor, major supplier. a. Attach sequential identification number for each new submittal. b. Identify each resubmittal using original submittal number and sequential identification clearly indicating item is resubmitted.
2. Identify pertinent Drawing sheet and detail number, and Specification section number as appropriate.
3. Identify deviations from Contract Documents.
4. Provide space for Contractor and Architect review stamps.
5. Contractor: Review and stamp submittals from subcontractors prior to submitting to Construction Manager.
a. Review submittals and indicate where conflicts occur with Contract Documents and with work of other subcontractors.
b. Return submittals that vary significantly from Contract Documents for correction and resubmittal prior to submitting to Construction Manager.
7.j.2
Packet Pg. 365 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 30 00 - 2 Administrative Requirements
c. Submittals that vary significantly from Contract Documents and that fail to indicate thorough Contractor review prior to submission to Construction Manager will be returned without review.
d. Cursory review and stamping of subcontractor submittal by Contractor shall not be acceptable.
B. Initial Schedules: Submit initial progress schedule and schedule of value in duplicate within 15 working days after award of Contract.
1. After review by City and Construction Manager revise and resubmit where required.
C. Comply with progress schedule for submittals related to Work progress. Coordinate submittal of related items.
D. After Construction Manager review of submittal, revise and resubmit as required, identify changes made since previous submittal.
1. Submittals Requiring Architect Response: Allow reasonable time for Architect review as well as time for preparation of resubmittals where required by Architect.
a. Do not delay submittals and do not consider Architect review time as part of Project schedule as multiple submittals and reviews may be required.
2. Contractor shall make complete and acceptable submittal by second submission and if not, shall be responsible for additional costs of Construction Manager and Architect/Engineer review beyond second submission.
a. Illegible and incomplete submittals will be rejected and returned to Contractor for resubmission.
b. Construction Manager reserves right to deduct monies from payments due Contractor to cover additional costs for Construction Manager and Architect/Engineer review beyond second submission.
E. Distribute copies of reviewed submittals to concerned persons. Instruct recipients to promptly report any inability to comply.
1.3 TYPES OF SUBMITTALS
A. General: Project requires various types of submittals to maintain communications, minimize misunderstandings, avoid unnecessary conflicts, to ensure compliance with Contract Documents, and to ensure complete documentation for Project Record Documents.
1. Maintain complete set of submittals including required revisions.
B. Construction Schedules: Submit construction progress schedules for Design Team and City review and to maintain entire team up to date on construction activities.
7.j.2
Packet Pg. 366 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 30 00 - 3 Administrative Requirements
C. Schedule of Values: Submit Schedule of Values indicating division of Work, subcontractors to perform work, products being used, and values attributed to each to inform Design Team and City.
D. Action Submittals: Submittals relating to product data and manufacturer’s literature, shop drawings, and samples for Design Team review and comment; do not begin fabrication, delivery, or installation until Design Team review is complete.
E. Information Submittals: Submittals relating to certifications, qualifications, reports, including test reports, and instructions are for information; Design Team may choose to comment but action is not generally anticipated.
1. Manufacturer installation instructions and recommendations shall be considered information submittals.
F. Design/Build Submittals: Where portion of Work requires design by specialized professionals submit information necessary to ensure work complies with Contract Documents along with certifications signed by qualified professional.
1. Calculations: Do not submit calculations unless specifically required by Contract Documents; submit calculations required by applicable authorities directly to applicable authorities.
a. Submit certification by qualified professional indicating required calculations have been prepared and work conforms to Contract Documents and applicable codes and regulations.
G. Maintenance Materials Submittals: Compile maintenance information and materials during Work to ensure complete set of documents, maintenance manuals, and operation instructions.
H. Closeout Submittals: Compile closeout submittals, organize, and submit to City prior to or at time of Substantial Completion. Project will not be considered Substantially Complete until closeout submittals have been received by City.
1.4 CONSTRUCTION PROGRESS SCHEDULES
A. Submit construction progress schedule with separate item for each major trade and operation, identifying first day of each week.
1. Show complete sequence of construction by activity, identifying work of separate stages and logically grouped activities.
2. Show projected percentage of completion for each item of Work as of time of each progress Application for Payment.
3. “Submittal Schedule”: Show Contractor submittal dates required for shop drawings, product data, and samples, and product delivery dates; deliver to Construction Manager per approved “Submittal Schedule.” a. “Submittal Schedule” may be incorporated into construction progress schedule or may be separate, Contractor option.
7.j.2
Packet Pg. 367 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 30 00 - 4 Administrative Requirements
b. Construction Manager’s Review Period: Construction Manager will be expedient in review however Contractor shall schedule submittals recognizing possibility Construction Manager may reject and may require resubmittal. c. Contract extension shall not be allowed for Contractor’s failure to properly schedule submittals to allow for Construction Manager requiring resubmittal.
B. Progress Schedule Format: Submit both horizontal bar chart and network analysis system using critical path method as approved by City.
1. Submit revised progress schedules with each Application for Payment reflecting changes since previous submittal, not less than monthly.
1.5 SCHEDULE OF VALUES
A. Submit typed schedule on AIA Form G703 or another City and Architect pre-approved 8-1/2" by 11" paper format; Contractor's standard media-driven printout will be considered on request. Submit within 15 days after award of Contract.
B. Format: Table of Contents of this Project Manual, with modifications as pre-approved by City and Architect; identify each line item with number and title of major Specification sections.
C. Include in each line item a directly proportional amount of Contractor overhead and profit.
D. Revise schedule to list change orders for each Application for Payment.
1.6 PRODUCT DATA/MANUFACTURERS' LITERATURE
A. Action Submittals: Mark each copy to identify applicable Products, models, options, and other data; supplement manufacturers' standard data to provide information unique to the Work.
B. Information Submittals: Include manufacturers' installation instructions only when required by Specifications or specifically requested by Architect.
1. Maintain copy of manufacturer installation instructions and recommendations in Contractor's field office for review.
C. Product data shall be submitted as electronic PDF files unless otherwise noted or approved by Architect in advance.
1. Where paper copies are permitted submit number of copies Contractor requires, plus one copy to be retained by Architect.
1.7 SHOP DRAWINGS
A. Shop drawings shall be submitted as electronic PDF files unless otherwise noted or approved by Architect in advance.
1. Where prints are permitted submit one reproducible print; minimum sheet size 8-1/2” by 11”.
B. Distribution: After review, reproduce and distribute.
7.j.2
Packet Pg. 368 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 30 00 - 5 Administrative Requirements
1.8 SAMPLES
A. Submit full range of manufacturers' standard colors, textures, and patterns for Architect's selection.
B. Submit samples to illustrate functional characteristics of Product, with integral parts and attachment devices.
C. Coordinate submittal of different categories for interfacing work.
D. Include identification on each sample, giving full information.
E. Submit number of samples required by Contractor plus one to be retained by Architect.
1. Maintain one set of approved samples at Project Field Office.
F. Sizes: Provide following sizes unless otherwise specified.
2. Flat or Sheet Products: Minimum 6" square, maximum 12" by 12".
3. Linear Products: Minimum 6", maximum 12" long.
4. Bulk Products: Minimum one pint, maximum one gallon.
G. Full size samples may be used in the Work upon approval.
1.9 MANUFACTURERS' CERTIFICATES
A. Submit certificates, in duplicate in accordance with requirements of each Specification section.
1.10 EXCESS MATERIALS AND ATTIC STOCK
A. Excess Materials: Excess materials shall be considered property of City; inform City of extent of excess materials and methods required for handling and storage; remove from site excess materials not required by City for maintenance stock.
B. Attic Stock: City may choose to obtain additional attic stock for maintenance purposes where excess materials are not considered adequate.
1. City may require as much as 5% extra materials for maintenance purposes.
Exact amount of each material shall be determined by City based on following meeting and additional costs determined by Contractor.
a. Contractor shall be prepared to order up to 5% extra materials on items that may not be readily available in future such as custom colors, offshore manufacture, anticipated life span under 5 years, and potential for damage. 1) Do not order extra attic stock until extent is determined and agreed to by City including which materials require extra stock and exactly how much those materials will cost including shipping and handling. b. Excess Materials: Furnish excess materials only for materials that have a shelf-life of more than three years.
7.j.2
Packet Pg. 369 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 30 00 - 6 Administrative Requirements
2. Meeting: Conduct meeting prior to beginning Work to discuss extent of materials City would like to receive at Project Closeout for attic stock for maintenance materials. Where available include personnel from City’s maintenance crew. a. Estimate amount of excess materials to be anticipated to be ordered in addition to materials for handling and storage and how those materials will be invoiced and identified regarding material and location in Project. b. Determine area necessary for adequate storage, handling, and identifying excess materials and attic stock and discuss with City. c. Submit information regarding equipment necessary for handling of excess materials and attic stock due to weight, size, and storage requirements. d. Assist City in determining where on-site or off-site additional attic stock for maintenance purposes will be delivered and stored.
3. Final Completion: Ensure attic stock has been received, identified, cataloged, and stored at locations agreed upon with City based on Change Order indicating amounts finally agreed to by City.
1.11 DESIGN/BUILD PROCEDURES
A. Design as Part of Means and Methods of Construction: Select Project components require construction team design as part of means and methods of construction as described in various sections.
1. Terms commonly used such as Design/Build, Delegated Design, and Design/Assist are applicable to these procedures as determined by law but shall be generally referred to in these documents as Design/Build. a. In general Design/Build includes design by licensed professionals with expertise beyond that allowed under standard architectural licensure, and outside of scope of work of other design professionals on the design team.
2. Contractor may be required to provide design services as part of construction for specific work defined as design or design-build where special expertise is required that is not available in the Project design team.
3. Subcontractors, fabricators, and manufacturers may be required to provide design services as part of their work due to special expertise in design services for their specific components, refer to technical sections for Design/Build.
4. Contractor, subcontractors, fabricators, manufacturers, and suppliers shall be responsible for attachments, anchors, fasteners, adhesives, and connectors suitable to applications unless specific items are listed in Contract Documents. a. Where specific items are listed in Contract Documents Contractor, subcontractors, fabricators, manufacturers, and suppliers shall review and submit comments where items listed are not acceptable.
b. Where no comments are received, listed items shall be considered acceptable.
7.j.2
Packet Pg. 370 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 30 00 - 7 Administrative Requirements
B. Contractor acknowledges and accepts responsibility for specialty design as part of means and methods of construction, as well as coordination of parties involved to achieve architectural design intent indicated in Contract Documents.
1. Design-build work includes sizing, sequencing, and detailing for construction by professional licensed or registered engineer or design professional with special expertise applicable to portion of Work involved.
2. Design-build work shall be constructed in compliance with building codes and regulations in effect and shall be fit and proper for intended use.
3. Design-build work shall include drawings, specifications, and calculations prepared, stamped, and signed by qualified professional licensed or registered engineer licensed in the Project location as appropriate to design-build work. a. Plans, specifications, and calculations shall be acceptable to City, City’s Representative, and applicable authorities.
C. Where required by City Contractor shall submit copies of current insurance policies covering errors and omissions of persons designing design-build work with deductibles and limits per occurrence as mutually agreed by City and Contractor.
1. Provide endorsement to insurance providing for 30-day notice to City prior to cancellation or material reduction in coverage.
2. Insurance shall be maintained for not less than applicable statute of limitations for claims of latent defects, if such insurance is not written on an occurrence basis during time design-build work is designed and constructed.
D. Review proposed layouts with Design Team and with various trades prior to commencing work related to design-build work.
END OF SECTION
7.j.2
Packet Pg. 371 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 31 00 - 1 Project Management and Coordination
SECTION 01 31 00
PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Description of Project management and coordination including but not necessarily limited to the following:
1. General Project coordination procedures.
2. Coordination drawings.
3. Staff names.
4. Administrative and supervisory personnel.
5. Project meetings.
B. Related Sections:
1. Section 01 30 00: Administrative requirements.
2. Section 01 79 00: Demonstration and training.
1.2 COORDINATION
A. Coordination: Coordinate construction operations included in various Specifications sections to ensure efficient and orderly installation of each part of Work.
1. Coordinate Work with all Utility services as required to complete Project as indicated.
2. Coordinate construction operations that depend on each other for proper installation, connection, and operation.
3. Coordinate work to assure efficient and orderly sequence of installation of construction elements.
4. Make provisions for accommodating items installed by City or under separate contracts.
B. Prepare memoranda for distribution to each party involved as needed, outlining special procedures required for coordination.
1. Include required notices, reports, and list of attendees at meetings; include Architect and City in distribution.
C. Verify characteristics of interrelated operating equipment are compatible; coordinate work having interdependent responsibilities for installing, connection to, and placing such equipment in service.
7.j.2
Packet Pg. 372 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 31 00 - 2 Project Management and Coordination
D. Coordinate space requirements and installation of mechanical and electrical work indicated diagrammatically on Drawings.
1. Follow routing shown for pipes, ducts, and conduits as closely as possible; make runs parallel with lines of building.
2. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
E. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated; coordinate locations of fixtures and outlets with finish elements.
F. Administrative Procedures: Coordinate scheduling and timing of administrative procedures with other construction activities and activities of other contractors to avoid conflicts and ensure orderly progress of Work.
1.3 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings for areas where space availability is limited and necessitates maximum utilization of space for components and where separate entities, products, and materials require coordination.
1. Require each subcontractor with items located in ceiling space to furnish coordination drawings of their items to assist in preparation of Contractor’s Coordination Drawings.
2. Indicate relationship of components shown on separate Shop Drawings.
3. Indicate required installation sequences.
4. Ceiling Spaces: Take special care to coordinate structure, ceiling systems, equipment located in ceiling spaces, fire protection systems, mechanical systems, and electrical systems.
B. Staff Names: Immediately after receipt of notice to proceed or immediately after signing of Contract by City and Contractor, submit list of principal staff assignments, including superintendent and other personnel in attendance at Project site.
1. Post copies of list in Project meeting room, in temporary field office, and by each temporary telephone.
1.4 SUPERVISORY AND ADMINISTRATIVE PERSONNEL
A. Provide supervisory personnel, in addition to Project Superintendent, as required for proper and timely performance of Work and coordination of subcontracts.
B. Provide administrative staff as required to allow Project Superintendent and supervisory personnel to allocate maximum time to Project supervision and coordination.
7.j.2
Packet Pg. 373 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 31 00 - 3 Project Management and Coordination
1.5 PROJECT MEETINGS
A. Schedule and administer Project meetings throughout progress of Work:
1. Pre-construction meeting.
2. Progress meetings at weekly intervals.
3. Pre-installation conferences.
4. Coordination meetings.
5. Special meetings.
B. Make physical arrangements for meetings, prepare agenda with copies for participants, preside at meetings, record minutes, and distribute copies within two days to Architect, City, Construction Manager, participants, and those affected.
C. Attendance: Job superintendent, major subcontractors, and suppliers as appropriate to agenda; Architect, City, Construction Manager, and Architect’s consultants as appropriate to agenda topics for each meeting.
1. Architect will attend progress meetings in person every other week and will attend other progress meetings via teleconference. Architect reserves right to attend other meetings via teleconference.
D. Suggested Agenda: Review of Work progress, status of progress schedule and adjustments, delivery schedules, submittals, requests for information, maintenance of quality standards, pending changes and substitutions, and issues needing resolution.
END OF SECTION
7.j.2
Packet Pg. 374 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 35 15 - 1 CALGreen Environmental Requirements
SECTION 01 35 15
CALGREEN ENVIRONMENTAL REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Comply with CALGreen environmental requirements related to energy efficiency, water efficiency and conservation, material conservation and resource efficiency, and environmental quality as adopted by San Carlos.
1. Comply with specific Milpitas adopted and modified CALGreen requirements for nonresidential projects as applicable to Fire Station 16.
1.2 ENVIRONMENTAL REQUIREMENTS
A. Mandatory Measures: Comply with San Carlos adopted and modified CALGreen Mandatory Measures applicable to Project applicable to Project.
1. Design team and construction team are each required to participate to maximum degree possible to achieve Milpitas-CALGreen environmental requirements.
2. Contract Documents are not intended to limit alternative means of achieving environmental requirements.
a. Suggestions from Contractor, subcontractors, suppliers, and manufacturers for achieving environmental requirements are encouraged; team approach is also encouraged.
3. Voluntary Tiers: Construction team is encouraged to work with City and Design Team to achieve enhanced Voluntary Tier levels by incorporating additional measures as defined in CALGreen Appendixes.
a. Contact City and Architect regarding extent of intent of Project to reach Voluntary Tiers, additional work necessary to achieve enhanced Voluntary Tiers, and potential costs involved in achieving each Voluntary Tier. b. Construction team is required to achieve Mandatory Measures and to achieve as much as possible without unacceptable cost impact or schedule impact as considered by City.
B. Requirements: Construction team is required to review San Carlos-CALGreen requirements relative to Nonresidential Project as adopted by Milpitas and relevant to Project.
1. Energy Efficiency: Comply with California Energy Commission requirements.
2. Water Efficiency and Conservation: Comply with requirements for both indoor and outdoor water use.
7.j.2
Packet Pg. 375 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 35 15 - 2 CALGreen Environmental Requirements
3. Material Conservation and Resource Efficiency:
a. Nonresidential Projects: Provide weather-resistant exterior wall and foundation envelope including prevention of landscape irrigation spray on structures (if any) and prevent water intrusion at exterior entries. b. Construction Waste: Provide construction waste management plan as defined by CALGreen with construction waste diverted from landfill by recycling or salvage for reuse.
c. Nonresidential Projects Building Maintenance and Operation: Provide for commissioning requirements as required by CALGreen including but not limited to testing, documentation and training, testing and adjusting.
4. Nonresidential Projects Environmental Quality:
a. Mechanical Equipment Pollution Control: Cover duct and related air distribution component openings to prevent dust and debris accumulation. b. Finish Material Pollution Control: Comply with Milpitas-CALGreen requirements for volatile organic compound (VOC) emissions including but not necessarily limited to following (as applicable):
1) Adhesives, sealants, and caulks.
2) Paints and coatings.
3) Carpet systems including carpet, carpet cushion, and adhesives. 4) Resilient flooring systems.
5) Composite wood products formaldehyde limitations.
c. Filters: Comply with requirements for mechanically ventilated buildings to have air filtration media for outside and return air prior to occupancy. d. Environmental Tobacco Smoke (ETS) Control: Comply with CALGreen requirements for ETS.
e. Interior Moisture Control: Comply with California Building Code requirements and CALGreen requirements for vapor retarder at concrete slab foundations and capillary break (aggregate base).
f. Building Material Moisture Content: Do not use water damaged building materials, remove and place wet and high moisture content insulation, and do not enclose wall or floor framing when moisture content exceeds 19%. g. Indoor Air Quality: Comply with CALGreen requirements for outside air delivery and carbon dioxide monitoring.
h. Environmental Comfort: Comply with CALGreen requirements for whole acoustical control and interior sound control.
i. Outdoor Air Quality: Comply with CALGreen requirements for reduction of greenhouse gases and ozone depletion.
C. Planning and Design: Construction team shall coordinate with Design Team regarding Project Planning and Design methods related to CALGreen requirements related to Project design and shall comply with requirements related to construction.
7.j.2
Packet Pg. 376 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 35 15 - 3 CALGreen Environmental Requirements
1.3 QUALITY ASSURANCE
A. Project Management and Coordination: Contractor to identify one person on Contractor’s staff to be responsible for Milpitas-CALGreen issues compliance and coordination.
1. Experience: Environmental project manager to have experience relating to Milpitas-CALGreen building construction.
2. Responsibilities: Carefully review Contract Documents for Milpitas-CALGreen issues, coordinate work of trades, subcontractors, and suppliers; instruct workers relating to environmental issues; and oversee Project Environmental Goals. a. Submittals: Collect, compile, verify, and maintain sufficient information for submittals indicating compliance with applicable Milpitas-CALGreen requirements.
3. Meetings: Discuss Milpitas-CALGreen Goals at following meetings. a. Pre-construction meeting.
b. Pre-installation meetings.
c. Regularly scheduled job-site meetings.
B. CALGreen Issues Criteria: Comply with requirements listed in San Carlos-CALGreen as indicated on Drawings and in various Specification sections.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General Issues: Do not use materials with moisture stains or with signs of mold or mildew.
1. Moisture Stains: Materials that have evidence of moisture damage, including stains, are not acceptable, including both stored and installed materials; immediately remove from site.
2. Mold and Mildew: Materials that have evidence of growth of molds or of mildew are not acceptable, including both stored and installed materials; immediately remove from site.
2.2 SUBSTITUTIONS
A. Substitutions Environmental Issues: Requests for substitutions shall comply with requirements specified in Section 01 25 00 – Substitution Procedures, with following additional information required where environmental issues are involved.
1. Indicate each proposed substitution complies with San Carlos-CALGreen requirements.
2. City and Architect reserve right to reject proposed substitutions where San Carlos-CALGreen information is not provided and where substitution may impact mandatory requirements or Project voluntary tier requirements.
7.j.2
Packet Pg. 377 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 35 15 - 4 CALGreen Environmental Requirements
PART 3 - EXECUTION
3.1 PROTECTION
A. Environmental Issues: Protect interior materials from water damage; where interior products not intended for wet applications are exposed to moisture, immediately remove from site.
1. Protect installed products using methods that do not support growth of molds and mildews. Immediately remove from site materials with mold and materials with mildew.
END OF SECTION
7.j.2
Packet Pg. 378 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 40 00 - 1 Quality Requirements
SECTION 01 40 00
QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. This section describes general quality control requirements.
1. General quality control.
2. Manufacturers' field services.
3. Mock-ups.
4. Independent testing laboratory services and inspections.
B. Related Requirements:
1. Refer to applicable codes and Specifications sections for test requirements.
1.2 QUALITY CONTROL, GENERAL
A. Maintain quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
1.3 MANUFACTURER'S FIELD SERVICES
A. When specified in respective Specification sections, require manufacturer or supplier to have qualified personnel provide on-site observations and recommendations.
1. Observe field conditions, including conditions of surfaces and installation.
2. Observe quality of workmanship.
3. Provide recommendations to assure acceptable installation and workmanship.
4. Where required, start, test, and adjust equipment as applicable.
B. Representative shall submit written report to Construction Manager or City listing observations and recommendations.
1.4 MOCK-UPS
A. Erect field samples and field mock-ups at locations on site as approved in advance and in accordance with requirements where included in Specifications section.
1. Test mock-ups requiring special equipment may be erected at location having access to necessary equipment. Coordinate with Construction Manager.
B. Field samples and mock-ups not approved and not capable of being acceptably revised shall be removed from site.
C. Approved field samples and mock-ups may be used as part of Project.
7.j.2
Packet Pg. 379 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 40 00 - 2 Quality Requirements
1.5 TESTING LABORATORY SERVICES AND INSPECTIONS
A. Testing laboratory services and inspections specified and required by applicable codes and regulations will be performed by firms independent of firms related to construction operations and shall be acceptable to applicable authorities.
1. Notify City immediately where potential conflict of interest may be involved with testing laboratories or inspection services for Project.
2. City or Architect may also require independent testing of items where doubts exist that product or system does not conform to Contract Documents.
3. City will employ and pay for testing laboratory and special inspectors to provide Project specific testing and inspections under applicable codes and Specification sections except where indicated otherwise.
a. City employment of testing laboratory and inspectors shall not relieve Contractor of obligation to perform Work in accordance with requirements of applicable codes and Contract Documents.
1) Laboratory and inspectors may not release, revoke, alter, or enlarge on requirements of Contract Documents.
b. Retesting required because of non-conformance to specified requirements shall be performed by City's testing laboratory.
1) Payment for retesting shall be charged to Contractor by deducting inspection and testing charges from Contract amount.
c. City provided testing shall be limited to Project specific testing and shall not include general tests or approvals of materials, equipment or systems. d. City provided inspections shall be limited to Project design team inspections and special inspectors required by applicable authorities.
B. Services shall be performed in accordance with requirements of governing authorities and with specified standards.
C. Reports will be submitted to Construction Manager in duplicate giving observations and results of tests and inspections, indicating compliance or non-compliance with specified standards and with Contract Documents.
1. Where required, testing laboratory and inspectors will submit copy of tests and inspections directly to enforcing agency.
D. Contractor shall cooperate with testing laboratory and inspection personnel; furnish tools, samples of materials, design mix, equipment, storage, and assistance as requested.
1. Notify City, Construction Manager, inspectors, and testing laboratory sufficiently in advance of expected time for operations requiring inspection and testing services.
END OF SECTION
7.j.2
Packet Pg. 380 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 50 00 - 1 Temporary Facilities and Controls
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 SUMMARY
A. This section describes temporary construction facilities and temporary controls.
1. Electricity and lighting.
2. Heat and ventilation.
3. Water and sanitary facilities.
4. Construction aids.
5. Temporary enclosures.
6. Barriers.
7. Cleaning during construction.
8. Project identification.
9. Cellular telephone service.
10. Storage.
B. Related Requirements:
1. Section 01 70 00: Progress cleaning and final cleaning.
2. Section 01 74 10: Waste management.
C. Provide temporary construction facilities and temporary controls as required to conform to applicable authorities and as required to complete Project in accordance with Contract Documents.
1. Authorities: Contact governing authorities to establish extent of temporary facilities and temporary controls required by authorities.
1.2 ELECTRICITY AND LIGHTING
A. Provide electrical service required for construction operations, with branch wiring and distribution boxes located to allow service and lighting by means of construction-type power cords.
B. Provide lighting for construction operations.
1. Permanent lighting may be used during construction; maintain lighting and make routine repairs.
1.3 HEAT AND VENTILATION
A. Provide heat and ventilation as required to maintain specified conditions for construction operation, to protect materials and finishes from damage due to temperature and humidity.
7.j.2
Packet Pg. 381 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 50 00 - 2 Temporary Facilities and Controls
1.4 WATER AND SANITARY FACILITIES
A. Provide water service required for construction operations; extend branch piping with outlets located so water is available by use of hoses.
B. Provide and maintain required sanitary facilities and enclosures.
1.5 CONSTRUCTION AIDS
A. Noise, Dust and Pollution Control: Provide materials and equipment necessary to comply with local requirements for noise, dust and pollution control.
B. Fire Protection: Maintain on-site fire protection facilities as required by applicable authorities and insurance requirements.
C. Security: Protect Site and Work; prevent unauthorized entry, vandalism, and theft.
1. Coordinate with City’s security program.
2. Contractor shall install time lapse video at construction site for security, to monitor Project progress, and to document construction progress.
D. Dewatering: Provide and operate drainage and pumping equipment; maintain excavations and site free of standing water.
1.1 ENCLOSURES
A. Temporary Closures: Provide temporary weather-tight closures for exterior openings for acceptable working conditions, for protection for materials, to protect interior materials from dampness, for temporary heating, and to prevent unauthorized entry.
1. Provide doors with self-closing hardware and locks.
1.2 BARRIERS
A. Barriers: Provide barriers as required to prevent public entry to construction areas and to protect adjacent properties from damage from construction operations.
1. Fence: Provide minimum 8-foot high commercial grade chain link or painted solid wood fence around construction site; equip with gates with locks.
B. Barricades: Provide barricades as required by governing authorities.
1.3 CLEANING DURING CONSTRUCTION
A. Control accumulation of waste materials and rubbish; recycle or dispose of off-site.
B. Clean interior areas prior to start of finish work, maintain areas free of dust and other contaminants during finishing operations.
7.j.2
Packet Pg. 382 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 50 00 - 3 Temporary Facilities and Controls
1.4 PROJECT IDENTIFICATION
A. Project Sign: Provide minimum 32-square foot Project identification sign of wood frame and exterior grade plywood construction, painted, with computer generated graphics by professional sign maker.
1. Design: As furnished by Architect.
2. Submit to City and Architect additional names or changes proposed to Project sign for prior written approval.
3. Erect on site at location established by Architect.
B. Other Signs: Subject to approval of Architect and City.
1.5 CELLULAR TELEPHONE SERVICE
A. Cellular Telephone Service: Furnish on-site Project Managers with cellular telephone.
Ensure City, Construction Manager, and Architect ability to contact site during construction operations.
1. Schedules: Submit schedules of on-site Project Managers with individual cellular telephone numbers to City and Architect; maintain schedules and cell phone numbers up to date during Project on-site operations.
1.6 STORAGE
A. Storage for Tools, Materials, and Equipment: Limit on-site storage to Project area; provide weather-tight storage, with heat and ventilation for products requiring controlled conditions.
1. Maintain adequate space for organized storage and access.
2. Provide lighting for inspection of stored materials.
1.7 REMOVAL
A. Remove temporary materials, equipment, services, and construction prior to Substantial Completion Inspection.
B. Clean and repair damage caused by installation or use of temporary facilities.
C. Restore existing facilities used during construction to specified or original condition.
END OF SECTION
7.j.2
Packet Pg. 383 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION #16
01 57 23 - 1 Temporary Erosion and Sediment Control
SECTION 01 57 23
TEMPORARY EROSION AND SEDIMENT CONTROL
PART 1 - GENERAL
1.1 DESCRIPTION
A. Work included: The work included in this Section includes all labor, materials, and equipment necessary to place temporary and permanent erosion and sediment control measures as specified herein.
B. Related work: Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, Sections in Division 1 and 2 of these Specifications, and:
1. Section 02 41 13 Selective Site Demolition
2. Section 31 10 00 Clearing and Grubbing
3. Section 31 20 00 Earthwork
4. Section 31 22 19 Finish Grading
5. Section 31 23 33 Trenching and Backfilling
6. “California Stormwater Quality Association Stormwater Best Management Handbook”, (2003 edition).
7. Association of Bay Area Governments, ABAG Erosion and Sediment handbook, current edition.
1.2 QUALITY ASSURANCE AND CONTROL
A. Use adequate numbers of skilled workers who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section.
1.3 ENVIRONMENTAL REQUIREMENTS
A. Protect adjacent properties and water resources from erosion and sediment damage throughout life of contract.
1.4 SUBMITTALS
A. Comply with City of San Carlos General Conditions.
B. Product Data: Submit:
1. Materials list of items proposed to be provided under this Section.
2. Specifications and other data needed to prove compliance with the specified requirements.
7.j.2
Packet Pg. 384 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION #16
01 57 23 - 2 Temporary Erosion and Sediment Control
PART 2 - PRODUCTS
2.1 FOR EROSION AND SEDIMENT CONTROL
A. The primary erosion and sediment control measures implemented during the Grading/Site Preparation phase of the project shall be inspected, maintained, and repaired in accordance with ABAG and Storm Water Pollution Prevention CASQA guidelines. Secondary measures such as Inlet Protection, dust control, erosion control blanket, temporary and permanent seeding shall be installed/applied as necessary.
B. Staked Hay Bales or straw wattle installed per Storm Water Pollution Prevention CASQA and ABAG guidelines.
C. Bale stakes for each bale shall be a minimum of 4-feet in length and shall be either two #2 rebars, two steel pickets, or two 2-inch X 2- inch hardwood stakes driven 1’6” into the ground..
D. Rip-Rap outlet protection and drainage structure inlet protection installed per Storm Water Pollution Prevention CASQA and ABAG guidelines.
E. Temporary Sediment Riser Outlet Structure installed per Storm Water Pollution Prevention CASQA and ABAG guidelines.
F. Inlet Protection installed per Storm Water Pollution Prevention CASQA and ABAG guidelines.
PART 3 - EXECUTION
3.1 Preparation
A. Contractor shall review the site in its entirety and photograph for reference.
B. Deficiencies or changes on Site Improvement Plans as it is applied to current conditions shall be brought to the attention of the City’s Representative.
3.2 Erosion Control and Storm Water Pollution Prevention Implementation A. Place erosion control and storm water pollution prevention measures in accordance with Storm Water Pollution Prevention CASQA and ABAG guidelines, as construction proceeds and the appropriate phase is in progress for each measure.
B. Permanent erosion control measures shall be incorporated into the Project at the earliest practical time to minimize the need for temporary controls.
C. After completion of the demolition phase and before the start of the Fire Station Replacement Project, the demolition contractor will be required to maintain, as necessary, SWPPP and erosion control measures until the Fire Station Replacement contractor takes over the site.
3.3 Permanent and Temporary Seeding Measures
7.j.2
Packet Pg. 385 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION #16
01 57 23 - 3 Temporary Erosion and Sediment Control
A. Permanently seed and mulch cut slopes as excavation proceeds to extent considered desirable and practical.
B. Slopes that erode easily or that will not be graded for a period of fourteen (14) days or more shall be temporarily seeded as work progresses with temporary seeding.
3.4 Removal of Erosion and Sediment Control Measures
A. All temporary erosion and sediment control BMPs, including but not limited to fiber rolls, gravel bag filters at drop inlets, silt fence, etc., shall be left in place after project acceptance.
END OF SECTION
7.j.2
Packet Pg. 386 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 60 00 - 1 Product Requirements
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. This section describes basic product requirements governing material and equipment.
1. General product requirements.
2. Product list.
3. Quality assurance.
4. Delivery, storage, and handling.
B. Related Requirements:
1. Section 01 25 00: Substitution procedures.
2. Section 01 30 00: Submittal of manufacturers' certificates.
3. Section 01 77 00: Operation and maintenance data.
1.2 GENERAL PRODUCTS REQUIREMENTS
A. Products include material, equipment, and systems.
B. Comply with Specifications, referenced standards, and applicable codes and regulations as minimum requirements.
C. Provide new materials except as specifically allowed by Contract Documents.
D. Materials to be supplied in quantity within a Specification section shall be by one manufacturer, shall be the same, and shall be interchangeable.
E. Provide equipment and systems composed of materials from a single manufacturer except where otherwise recommended by equipment or systems manufacturer or where otherwise indicated in Contract Documents.
F. Manufacturers: Manufacturers listed in Specifications, on Drawings, on Schedules, and in Notes shall be considered acceptable to extent their products comply with Contract Documents requirements and are suitable for applications indicated.
1. Manufacturer’s representative shall be responsible for reviewing Contract Documents and verifying their specified products conform to Contract Documents, applicable codes and regulations, and are suitable for applications indicated. a. Where manufacturer’s representative believe their specified products do not conform to requirements specified or are not are suitable for applications indicated, immediately notify Construction Manager.
b. Where manufacturer’s representative believes another product they produce is more suitable for compliance with Contract Documents, applicable codes and regulations, or applications indicated, immediately notify Construction Manager.
7.j.2
Packet Pg. 387 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 60 00 - 2 Product Requirements
2. Basis of Design: Following shall be considered as Basis of Design. a. Specific manufacturers and products identified in Specifications as Basis of Design.
b. Specific manufacturers and products listed in Schedules. c. Specific manufacturers and products listed on Drawings or in Notes. d. Where more than one manufacturer or product is listed as Basis of Design immediately notify Construction Manager and request clarification. 1) Where more than one manufacturer or product is listed as Basis of Design in one location in Contract Documents clearly indicating either is acceptable, no clarification would be necessary.
G. Contractor’s Options: Comply with following options; requests for substitutions for named manufacturers and products shall comply with requirements specified in Section 01 25 00 – Substitution Procedures.
1. Products Identified by Reference Standards: Select product meeting referenced standard for products specified only by reference standard. a. Requests for Substitutions to be limited to products not complying with referenced standards.
1) Submit justification for non-compliance with reference standards as part of Request for Substitutions; if product is foreign made submit rationale why foreign standards and basic materials indicates compliance.
2. Named Manufacturers: Where names of manufacturers are specified select any named manufacturer product meeting Specifications for products specified by naming one or more manufacturers.
a. Submit Request for Substitution for any manufacturer not named.
3. Named Manufacturers and Named Products: Select any named manufacturer named product meeting Specifications for products specified by naming one or more manufacturers and products.
a. Where only one manufacturer and product is named, together with additional manufacturers without specific products, Requests for Substitutions to be limited to products not comparable to that specified.
1) Contractors, subcontractors, suppliers, and manufacturers shall take special care to ensure comparable products are being supplied based on design, performance, quality, and longevity.
2) Substitutions: Submit Request for Substitution for any manufacturer not named and for products not comparable to those specified in design, performance, quality, and longevity.
7.j.2
Packet Pg. 388 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 60 00 - 3 Product Requirements
4. Basis of Design: Where manufacturer or manufacturer and product both are indicated as Basis of Design, submit Request for Substitution for other manufacturers and products.
5. “Or Equal” Clauses: Submit request for substitution for manufacturer or product not specifically named in Specifications where terms "or equal", "or approved equal", or similar references are made.
1.3 SUBMITTALS
A. Product List: Within 35 days after award of Contract, submit to City and Construction Manager a complete list of major products proposed for installation, with name of manufacturer, trade name, and model.
1. Tabulate products by Specification number and title.
B. Substitutions: Refer to Section 01 25 00 – Substitution Procedures.
1.4 QUALITY ASSURANCE
A. Comply with industry standards and applicable codes except when more restrictive tolerances or requirements indicate more rigid standards or precise workmanship.
B. Perform work by persons qualified to produce workmanship of specified quality.
C. Install products straight, true-to-line, and in correct relationship to adjacent materials, with hairline joints, free of rough, sharp, and potentially hazardous edges.
D. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking.
1. Seismic Anchors: Conform to code requirements.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Transport products by methods to avoid product damage, deliver in undamaged condition in manufacturer's unopened containers or packaging.
B. Store products in accordance with manufacturer's instructions, with seals and labels intact and legible.
C. Store sensitive products in weather-tight enclosures; maintain within temperature and humidity ranges required by manufacturer's instructions.
D. For exterior storage of fabricated products, place on sloped supports above ground.
E. Store loose granular materials on solid surfaces in a well-drained area; prevent mixing with foreign matter.
F. Arrange storage to provide access for inspection; periodically inspect to assure products are undamaged and are maintained under required conditions.
G. Provide equipment and personnel to handle products by methods to prevent soiling and prevent damage.
7.j.2
Packet Pg. 389 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 60 00 - 4 Product Requirements
H. Promptly inspect shipments to assure products comply with requirements, quantities are correct, and products are undamaged.
I. Immediately remove from Project products damaged, wet, stained, and products with mold and products with mildew.
1. Take special care to prevent absorbent products such as gypsum board and acoustical ceiling units from becoming wet.
END OF SECTION
7.j.2
Packet Pg. 390 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 70 00 - 1 Execution Requirements
SECTION 01 70 00
EXECUTION REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. This section describes execution requirements.
1. Installer qualifications.
2. Examination.
3. Manufacturer’s instructions.
4. Installation.
5. Cleaning.
6. Protection.
B. Related Requirements:
1. Section 01 50 00: Cleaning during construction.
2. Section 01 77 00: Closeout procedures.
3. Section 01 79 00: Demonstration and training.
1.2 INSTALLER QUALIFICATIONS
A. Experienced Installers: Installers to have minimum five-years successful experience installing items like those required for Project, except for individuals in training under direct supervision of experienced installer.
1.3 EXAMINATION
A. Acceptance of Conditions: Beginning installation of a product signifies installer has examined substrates, areas, and conditions for compliance with manufacturer requirements for tolerances and other conditions affecting performance.
B. Field Measurements: Take field measurements as required to fit Work properly; recheck measurements prior to installing each product.
1. Where portions of Work are to fit to other construction verify dimensions of other construction by field measurements before fabrication; allow for cutting and patching to avoid delaying Work.
C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.
1.4 MANUFACTURERS' INSTRUCTIONS
A. Manufacturer’s Recommendations: When work is specified to comply with manufacturers' recommendations or instructions, distribute copies to persons involved and maintain one set in field office.
1. Conform to requirements specified in Section 01 30 00 for submittal of recommendations or instructions to Construction Manager; submit to Construction Manager only where specified or where specifically requested; otherwise keep in Field Office.
7.j.2
Packet Pg. 391 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 70 00 - 2 Execution Requirements
B. Perform work in accordance with details of recommendations and instructions and specified requirements.
1. Should a conflict exist between Specifications and recommendations or instructions consult with Construction Manager.
C. Where manufacturer's information notes special recommendations in addition to installation instructions, comply with both recommendations and instructions.
1.5 INSTALLATION
A. Pre-Installation Meetings: Installers and suppliers are to attend pre-installation meetings scheduled by Contractor.
B. Comply with manufacturers written recommendations and installation instructions unless more restrictive requirements are specified.
C. Locate Work and components accurately, in correct alignment and elevation.
1. Make vertical work plumb and horizontal work level.
2. Install components to allow space for maintenance and ease of removal for replacement.
D. Install products at time and under conditions to ensure best possible results; maintain conditions required for product performance until Substantial Completion.
E. Conduct operations so no part of Work is subject to damaging operations or excessive loads during normal conditions.
F. Securely anchor permanent construction in place, accurately located and aligned with other portions of Work.
G. Allow for building movement including thermal expansion and contraction.
H. Make joints of uniform width; arrange joints as indicated, for best visual effect where not otherwise indicated; fit exposed connections together to form hairline joints except where otherwise indicated.
1.6 CLEANING
A. Cleaning During Construction: Specified in Section 01 50 00 - Temporary Facilities and Controls.
B. Progress Cleaning: Keep installed areas clean using cleaning materials specifically recommended by manufacturers of product being cleaned. Where not otherwise recommended use nontoxic materials that will not damage surfaces.
1. Remove debris from concealed spaces before enclosing space.
2. Supervise construction operations to assure no part of construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during construction period.
7.j.2
Packet Pg. 392 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 70 00 - 3 Execution Requirements
C. Final Cleaning: Execute final cleaning at Substantial Completion, prior to Final Completion.
1. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
2. Employ experienced workers or professional cleaners for final cleaning. a. Complete following cleaning operations before requesting inspection for certification of Project completion for entire Project or for portion of Project. 1) Clean Site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter and other foreign substances.
2) Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
3) Rake grounds that are neither planted nor paved to smooth, eventextured surface. 4) Remove tools, construction equipment, machinery, and surplus material from Site.
5) Clean exposed exterior and interior hard-surfaced finishes to dirt-free condition, free of stains, films, and similar foreign substances. 6) Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.
7) Sweep concrete floors broom clean in unoccupied spaces. 8) Vacuum carpet and similar soft surfaces removing debris and excess nap, shampoo if visible soil or stains remain.
9) Clean transparent materials, including mirrors and glass in doors and windows.
10) Remove glazing compounds and other noticeable, vision-obscuring materials. Replace chipped and broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces.
11) Remove labels that are not permanent.
12) Touch-up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. b. Clean plumbing fixtures to sanitary condition free of stains, including stains resulting from water exposure.
7.j.2
Packet Pg. 393 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 70 00 - 4 Execution Requirements
c. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out bulbs and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.
d. Leave Project clean.
3. Vacuuming Equipment: Type with high efficiency particulate arrestor (HEPA) type filters; properly maintained.
4. Clean equipment and fixtures to a sanitary condition, clean filters of mechanical equipment, replace filters where cleaning is impractical. a. Clean ducts.
5. Pest Control: Engage an experienced licensed exterminator to make a final inspection and rid Project of rodents, insects, and other pests. Exterminator to prepare a report on findings and recommendations for future recommendations.
6. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on City property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Site and dispose of lawfully.
1.7 PROTECTION
A. Protect products subject to deterioration with impervious cover. Provide ventilation to avoid condensation and trapping water.
B. Take care to use protective covering and blocking materials that do not soil, stain, or damage materials being protected.
C. After installation, provide coverings to protect products from damage from traffic and construction operations, remove when no longer needed.
D. Protect interior materials from water damage; immediately remove wet materials from site to prevent growth of mold and mildew on site.
END OF SECTION
7.j.2
Packet Pg. 394 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 73 00 - 1 Cutting and Patching
SECTION 01 73 00
CUTTING AND PATCHING
PART 1 - GENERAL
1.1 SUMMARY
A. Contractor is responsible for cutting, fitting, and patching to complete Work and to:
1. Make its parts fit together properly.
2. Uncover work to provide for installation of ill-timed work.
3. Remove and replace defective work.
4. Remove and replace work not conforming to Contract Documents.
5. Remove samples of installed work as required for testing.
6. Provide routine penetrations of non-structural surfaces for installation of piping.
7. Provide routine penetrations of non-structural surfaces for installation of conduit.
B. Related Requirements:
1. Section 01 50 00: Temporary facilities and controls.
2. Section 02 41 00: Structure demolition.
1.2 SUBMITTALS
A. Submit written request well in advance of cutting or alteration which affects:
1. Work of City or separate contractor.
2. Structural value or integrity of any element of Project.
3. Integrity of weather-exposed or moisture-resistant elements.
4. Efficiency, operational life, maintenance, or safety of operational elements.
5. Visual qualities of sight-exposed elements.
B. Request shall include:
1. Identification of Project and description of affected work.
2. Necessity for cutting or alteration.
3. Effect on work of City or separate contractor.
4. Effect on structural integrity, or weatherproof integrity of Project.
5. Alternatives to cutting and patching.
6. Cost proposal, when applicable.
7. Written permission of separate contractor whose work will be affected.
8. Description of proposed work including:
a. Scope of cutting, patching, alteration, or excavation. b. Products proposed to be used.
c. Extent of refinishing to be included.
C. Should conditions of Work or schedule indicate a change of products from original installation, Contractor shall submit request for substitution as specified in Section 01 25 00 – Substitution Procedures.
D. Submit written notice to Construction Manager designating date and time work will be uncovered.
7.j.2
Packet Pg. 395 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 73 00 - 2 Cutting and Patching
PART 2 - PRODUCTS
2.1 MATERIALS
A. Comply with Specifications and standards for each specific product involved.
B. Where Specifications and standards have not been provided, provide materials and fabrication consistent with quality of Project and intended for commercial construction.
C. Provide new materials for cutting and patching unless otherwise indicated.
PART 3 - EXECUTION
3.1 INSPECTION
A. Inspect existing conditions of Project, including elements subject to damage or to movement during cutting and patching.
B. After uncovering work, inspect conditions affecting installation of products, or performance of work.
C. Report unsatisfactory or questionable conditions to Construction Manager in writing; do not proceed with work until Construction Manager has provided further instructions.
3.2 PREPARATION
A. Provide adequate temporary support as necessary to assure structural value or integrity of affected portion of Work.
1. Provide services of licensed engineer for designing temporary support where required by applicable authorities for temporary supports and for shoring; submit engineering calculations directly to applicable authorities upon request.
B. Protect other portions of Project from damage.
3.3 PERFORMANCE
A. Execute cutting by methods that provide proper surfaces to receive installation of repairs and finishes.
1. Execute excavating and backfilling by methods which will prevent settlement, and which will prevent damage to other work.
B. Employ same installer or fabricator to perform cutting and patching work as employed for new construction for:
1. Weather-exposed or moisture resistant elements.
2. Sight-exposed finished surfaces.
C. Execute fitting and adjustment of products to provide a finished installation to comply with specified products, functions, tolerances, and finishes.
7.j.2
Packet Pg. 396 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 73 00 - 3 Cutting and Patching
D. Restore work that has been cut or removed; install new products to provide completed Work in accordance with requirements of Contract Documents.
E. Fit work tight to pipes, sleeves, ducts, conduit, and penetrations through surfaces.
F. Refinish entire surfaces as necessary to provide even finish to match adjacent finishes:
1. For continuous surfaces, refinish to nearest intersection.
2. For an assembly, refinish entire unit.
END OF SECTION
7.j.2
Packet Pg. 397 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 74 10 - 1 Waste Management
SECTION 01 74 10
WASTE MANAGEMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Project requires special Waste Management Program.
1. CALGreen Waste Management: As required in Section 01 35 15.
2. Effect optimum control of solid wastes.
3. Prevent environmental pollution and damage.
B. Related Work:
1. Section 01 35 15: CALGreen environmental requirements.
2. Section 01 50 00: Temporary facilities and controls.
1.2 DEFINITIONS
A. Inert Fill: A permitted facility that accepts inert waste such as asphalt and concrete exclusively.
B. Class III Landfill: A landfill that accepts non-hazardous waste such as household, commercial, and industrial waste, including construction, remodeling, repair, and demolition operations.
C. Construction and Demolition Waste: Includes solid wastes, such as building materials, packaging, rubbish, debris, and rubble resulting from construction, remodeling, repair, and demolition operations.
1. Rubbish: Includes both combustible and noncombustible wastes, such as paper, boxes, glass, crockery, metal and lumber scrap, tin cans, and bones.
2. Debris: Includes both combustible and noncombustible wastes, such as leaves and tree trimmings that result from construction or maintenance and repair work.
D. Chemical Waste: Includes petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals and inorganic wastes.
E. Sanitary Wastes:
1. Garbage: Refuse and scraps resulting from preparation, cooking, distribution, or consumption of food.
2. Sewage: Domestic sanitary sewage.
7.j.2
Packet Pg. 398 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 74 10 - 2 Waste Management
1.3 SUBMITTALS
A. Waste Management Program: Comply with Contract Documents and applicable code requirements for salvaging, recycling, and disposing of nonhazardous waste.
1. Prior to commencement of Work, schedule and conduct meeting with City and Construction Manager to discuss proposed Waste Management Program.
2. Develop mutual understanding relative to details of recycling, and rebate programs.
3. Prepare and submit a written and graphic Waste Management Program including, but not limited to, the following:
a. Indicate procedures to be implemented.
b. Estimate total Project waste to be generated, and estimated cost of disposing of Project waste in landfills.
c. Estimate total cubic yards of following waste categories to be diverted from landfill.
1) Clean dimensional wood, palette wood.
2) Plywood, oriented strand board, and medium density fiberboard. 3) Cardboard, paper, packaging.
4) Other items as directed by City and Construction Manager. d. Estimate amounts of following waste categories in appropriate units (weight, feet, square yards, gallons).
1) Metals.
2) Gypsum board.
3) Carpet.
4) Paint.
5) Other items as directed by City and Construction Manager. e. Submit permit or license and location of waste disposal areas. f. Submit procedures for recycling/re-use program.
g. Submit procedures for rebate programs.
h. Revise and resubmit Waste Management Program as required by City and Construction Manager.
1) Review of Contractor's Waste Management Program will not relieve Contractor of responsibility for control of pollutants and other environmental protection measures.
B. Submit summary of solid waste generated by Project with each application for progress payment, on form acceptable to City and Construction Manager; include manifests, weight tickets, receipts, and invoices identifying Project and waste delivered to following locations.
1. Recycling Centers.
2. Class III landfills.
3. Inert fills.
7.j.2
Packet Pg. 399 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 74 10 - 3 Waste Management
C. Prepare rebate information and product documentation as required for City to qualify for rebate programs; submit with final closeout submittals.
1. Where feasible submit in electronic format, otherwise in 3-ring binder.
1.4 RECYCLING PROGRAM
A. Recycling: Implement recycling program that includes separate collection of waste materials of following types as applicable to Project requirements; recycling program to be applied by Contractors and subcontractors. Comply with City of Milpitas waste management program requirements.
1. Land clearing debris.
2. Asphaltic concrete.
3. Concrete.
4. Masonry materials.
5. Ferrous metal.
6. Non-ferrous metal.
7. Clean dimensional wood and palette wood.
8. Plywood, oriented strand board, and medium density fiberboard.
9. Paper - bond.
10. Paper - newsprint.
11. Cardboard and paper packaging materials.
12. Glass.
13. Plastics.
14. Gypsum board (unpainted).
15. Paint.
16. Rigid foam.
17. Carpet and pad.
18. Beverage containers.
19. Porcelain plumbing fixtures.
20. Insulation.
21. Others as appropriate.
B. Handling: Keep materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to recycling process.
1. Clean materials contaminated prior to placing in collection containers.
2. Arrange for collection by or delivery to appropriate recycling center or transfer station that accepts construction and demolition waste for purpose of recycling.
C. Participate in Re-Use Programs: Rebates, tax credits, and other savings obtained for recycled or re-used materials shall accrue to Contractor.
END OF SECTION
7.j.2
Packet Pg. 400 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 77 00 - 1 Closeout Procedures
SECTION 01 77 00
CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This section describes Contract closeout procedures.
1. Substantial Completion.
2. Final Completion.
3. Project record documents.
4. Material and finish data.
5. Operation and maintenance manuals.
B. Related Requirements:
1. Section 01 30 00: Administrative requirements including attic stock.
2. Section 01 78 00: Warranties.
3. Section 01 79 00: Demonstration and training.
1.2 SUBSTANTIAL COMPLETION
A. Immediately prior to Substantial Completion, schedule agency reviews as required for “temporary certificate of occupancy” or for “certificate of occupancy”.
B. When Contractor considers Work, or a designated portion thereof is substantially complete, submit written notice, with list of items to be completed or corrected.
1. List (“Punch List”): Format pre-approved by City and Architect; tabular form with each space listed required.
C. Within a reasonable time, City, Architect, and Construction Manager will inspect status of completion and may add to “Punch List”.
D. Should City, Architect, and Construction Manager determine Work is not substantially complete, Contractor will be promptly notified in writing, giving reasons.
E. Contractor shall remedy deficiencies and send a second written notice of substantial completion; City, Architect, and Construction Manager will reinspect Work.
1. Contractor shall pay for Architect’s time and direct expenses where more than one Substantial Completion inspection is required.
F. When Work is determined to be substantially complete by Owner, Architect, and Construction Manager a Certificate of Substantial Completion will be prepared in accordance with General Conditions.
7.j.2
Packet Pg. 401 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 77 00 - 2 Closeout Procedures
1.3 FINAL COMPLETION
A. When Work is complete, submit written certification indicating:
1. Work has been inspected for compliance with Contract Documents.
2. Work has been completed in accordance with Contract Documents and deficiencies listed (in ‘Punch List”) with Certificate of Substantial Completion have been corrected.
3. Equipment and systems have been tested in presence of City's representative and are operational.
4. Work is complete and ready for final inspection.
B. Special Submittals: In addition to submittals required by Contract, submit following.
1. Provide submittals required by governing authorities to governing authorities with copies included in Project Record Documents.
2. Submit final statement of accounting giving total adjusted Contract Sum, previous payments, and sum remaining due.
1.4 PROJECT RECORD DOCUMENTS
A. Keep documents current; do not permanently conceal any work until required information has been recorded.
1. City will provide Contractor with a separate set of Drawings to maintain for Project Record Documents.
2. Store reproducible Drawings, one set of Project Manual, and one copy of each Change Order separate from documents used for construction, for use as Project Record Documents.
3. Indicate actual work on Drawings; indicate actual products used in Project Manual, including manufacturer, model number and options.
4. Update Project Record Documents daily and allow for Architect inspection at least once a month.
B. At Contract close-out submit documents with transmittal letter containing date, Project title, Contractor's name and address, list of documents, and signature of Contractor.
C. Final Completion Submittal: At Project Completion submit both Project Record Documents with transmittal letter containing date, Project title, Contractor's name and address, list of documents, and signature of Contractor.
1.5 MATERIAL AND FINISH DATA
A. Provide data for primary materials and finishes.
7.j.2
Packet Pg. 402 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 77 00 - 3 Closeout Procedures
B. Submit two sets prior to final inspection, bound in 8-1/2" by 11" three-ring binders with durable plastic covers, clearly identified regarding extent of contents.
1. Electronic Format: Where available in electronic format, submit USB 3.0 flash drives with information required for material and finish data.
C. Arrange by Specification division and give names, addresses, and telephone numbers of subcontractors and suppliers. List:
1. Trade names, model, or type numbers.
2. Cleaning instructions.
3. Product data.
4. Maintenance recommendations.
1.6 OPERATION AND MAINTENANCE MANUALS
A. Provide manuals for:
1. Electrically operated items.
2. Electrical equipment and controls.
3. Maintenance manuals provided as part of Submittals.
B. Submit three sets prior to final inspection, bound in 8-1/2" by 11" three-ring binders with durable plastic covers, clearly identified regarding extent of contents.
C. Provide a separate volume for each system, with a table of contents and index tabs for each volume.
D. Arrange by Specification division and gives names, addresses, and telephone numbers of Subcontractors and suppliers. List:
1. Appropriate design criteria.
2. List of equipment and parts lists.
3. Operating and maintenance instructions.
4. Shop drawings and product data.
E. Electronic Format: Where available in electronic format, submit two USB 3.0 flash drives with information required for operation and maintenance manuals.
END OF SECTION
7.j.2
Packet Pg. 403 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 78 00 - 1 Warranties
SECTION 01 78 00
WARRANTIES
PART 1 - GENERAL
1.1 SUMMARY
A. Warranties: Compile required, and incidental warranties required by Contract Documents.
1. Manufacturer Warranties: Provide manufacturer’s standard warranties where specified including inspections and services included or required as part of manufacturer’s standard warranty.
2. Special Warranties: Provide special warranties as required by Specifications sections.
3. These warranties shall be in addition to and not a limitation of other rights City may have against Contractor under Contract Documents and which may be prescribed by law, regardless of wording of warranty.
B. Extended Correction Period: Contractor shall correct failure of materials and systems to perform in a manner consistent with their intended use including but not limited to failure of waterproofing and roofing systems to resist penetration from water.
1. Standard Correction Period: One year after Substantial Completion or Beneficial Occupancy by City except where otherwise noted in Contract Documents; coordinate with General Conditions and Supplementary Conditions. a. Items used by Contractor during construction operations shall not be considered substantially completed.
b. Correction of Work Period begins with City occupancy not completion of component.
2. Extended Correction Period: Requirements are same as standard correction period but for an extended period as indicated in Specifications sections.
3. Contractor Responsibilities: Bear cost of correcting failed work and replacing construction damaged by failure of materials and systems to perform in a manner consistent with their intended use during correction period. a. Requirements for correction period shall apply to Subcontractors, suppliers, installers, and those responsible for failed work.
b. City and Design Team shall not be responsible for determining degree of responsibility of those involved.
4. City’s Rights under Law: Correction period shall be in addition to and not a limitation of other rights City may have against Contractor under Contract Documents and which may be prescribed by law.
7.j.2
Packet Pg. 404 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 78 00 - 2 Warranties
1.2 PRODUCT WARRANTIES
A. Warranties specified in other Sections shall be in addition to and run concurrent with other warranties required by Contract Documents. Manufacturer’s disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of Contract Documents.
1. Manufacturer’s Warranty: Preprinted written warranty published by individual manufacturer for a product and specifically endorsed by manufacturer to the City.
2. Special Warranty: Written warranty required by or incorporated into Contract Documents, either to extend time limit provided by manufacturer’s warranty or to provide more rights foe the City.
B. Special Warranties: Prepare written document that contains appropriate terms and identification ready for execution. Submit draft for approval before final execution.
1. Manufacturer’s Standard Form: Modified to include Project specific information and properly executed.
2. Specified Form: When specified forms are included with Specifications prepare written document using appropriate form properly executed.
3. Refer to Divisions 02 through 33 Sections for specific content requirements and requirements for submitting special warranties. Comply with requirements in Section 01 77 00 – Closeout Procedures.
1.3 FORM OF SUBMITTAL
A. Special Warranty and Extended Correction Period Forms: Provide duplicate copies, notarized or on Contractor and Manufacturer's letterhead without conditions or exceptions to requirements specified.
1. Assemble documents executed by subcontractors, installers, suppliers, and manufacturers.
2. Provide table of contents and assemble in binder with durable plastic cover, clearly identified regarding extent of contents.
3. Electronic Format: Submit USB 3.0 flash drives of warranties, in Microsoft Word.
B. Manufacturer Warranty Forms: Use manufacturer’s standard forms unless otherwise directed in Contract Documents; completed form shall not detract from or confuse interpretations of Contract Documents.
1. Manufacturer’s authorized representative shall sign manufacturer warranties.
2. Subcontractor and installer shall countersign warranty where specified. a. Provide required warranties for waterproofing and roofing systems countersigned by subcontractor and installer.
7.j.2
Packet Pg. 405 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 78 00 - 3 Warranties
C. Submit final warranties prior to final application for payment.
1. For equipment put into use with City's permission during construction, submit within ten days after first operation.
2. For items of Work delayed materially beyond Date of Substantial Completion, provide updated submittal within ten days after acceptance, listing date of acceptance as start of warranty period.
D. Provide information for City's personnel regarding proper procedure in case of failure and instances that might affect validity of manufacturer warranty.
E. Size: 8-1/2" by 11" for three-ring binder; fold larger sheets to fit.
1.4 WARRANTIES AND CORRECTION OF WORK DOCUMENTS
A. Warranties and Correction of Work Documents are intended to protect City against failure of work and against deficient, defective and faulty materials and workmanship, regardless of sources.
B. Limitations: Warranties and correction of work requirements are not intended to cover failures that result from:
1. Unusual or abnormal phenomena of the elements.
2. City's misuse, maltreatment or improper maintenance of work.
3. Vandalism after substantial completion.
4. Insurrection or acts of aggression including war.
C. Related Damages and Losses: Remove and replace work which is damaged as result of failure, or which must be removed and replaced to provide access for correction of work.
D. Reinstatement: After correction of work reinstate warranty or extended correction period for corrected work to date of original expiration, but not less than half original period.
1. Correction of Work Period: The general correction of work period specified shall not be extended by corrective work except to extent required to correct failure and repair or replace materials damaged by failure.
E. Replacement Cost: Replace or restore failing items without regard to anticipated useful service lives where part of correction of work period, extended correction of work period, and special warranty period unless otherwise noted.
F. Rejection of Warranties: City reserves right to reject unsolicited and coincidental product warranties that detract from or confuse interpretations of Contract Documents.
END OF SECTION
7.j.2
Packet Pg. 406 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 79 00 - 1 Demonstration and Training
SECTION 01 79 00
DEMONSTRATION AND TRAINING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Provide equipment and systems demonstration and instruction in accordance with Contract Documents.
B. Related Sections:
1. Section 01 31 00: Project management and coordination.
2. Section 01 77 00: Contract closeout procedures.
3. Refer to Facility Services Subgroups for mechanical and electrical requirements.
1.2 DESCRIPTION
A. Seminar Agenda and Outline:
1. Prepare a seminar agenda and outline in consultation and cooperation with City.
Include following:
a. Equipment and systems that will be included in seminars. b. Name of companies and representatives presenting at seminars. c. Outline of each seminar's content.
d. Time and date allocated to each system and item of equipment.
2. Submit preliminary seminar agenda and outline for review and comment by City. a. Revise and resubmit agenda and outline until all seminar requirements have been satisfied and seminar dates and presenters have been finalized.
3. Submit final seminar agenda and outline no later than eight weeks before date of Acceptance of Work.
B. Seminar Organization:
1. Contractor’s presentation leaders shall chair seminars. a. Coordinate qualification of training personnel, seminar contents, and presentations with City.
2. Coordinate individual presentations and ensure manufacturer’s representatives scheduled to be at training seminars are present.
3. Coordinate proposed seminar dates with City and select mutually agreeable dates.
7.j.2
Packet Pg. 407 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
01 79 00 - 2 Demonstration and Training
4. Arrange for presentation leaders familiar with design operation, maintenance and troubleshooting of equipment and systems.
a. Where one person is not familiar with all aspects of equipment or system; arrange for specialists familiar with each aspect.
C. Seminar Content:
1. Architect’s Consultants will explain design philosophy of primary systems.
2. Include following information in presentations dealing with specific systems. a. An overview of how system is intended to operate.
b. Describe design parameters, constrains and operational requirements. c. Describe system operation strategies.
d. Provide information to help in identifying and troubleshooting problems.
3. Include following information in presentations dealing with equipment. a. Explanation of how equipment operates.
b. Recommended preventative and routine maintenance.
D. System Demonstration:
1. Demonstrate operation of equipment and systems when specified in individual technical sections. Include following in demonstration. a. Start-up and shut down.
c. Operation.
d. Scheduled and preventative maintenance.
e. Troubleshooting.
2. Demonstration may be conducted at time of original starting with City's prior approval.
E. Seminar and Demonstration Questions:
1. Be prepared to answer questions raised by City’s personnel at demonstrations and seminars.
2. If unable to satisfactorily answer questions immediately, provide written response within three days.
F. Use manufacturer’s operation and maintenance data as basis of instruction.
END OF SECTION
7.j.2
Packet Pg. 408 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
02 41 10 - 1 Structure Demolition
SECTION 02 41 10
STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Demolish existing construction as required for Project.
1. Remove existing materials and equipment from site.
2. Remove foundations including basement floor slabs.
3. Cap and identify active utilities.
B. Related Sections:
1. Section 01 10 00: Summary of work including hazardous materials requirements.
2. Section 01 50 00: Temporary facilities including barriers and waste management.
3. Section 01 74 10: Waste management.
4. Municipal Authorities: Dismantling, removing, and capping of Municipal utilities.
1.2 ADMINISTRATIVE REQUIREMENTS
A. Coordination:
1. Do not interfere with use of adjacent buildings; maintain free and safe passage to and from.
2. Prevent movement or settlement of adjacent structures, provide and place bracing or shoring and be responsible for safety and support of structures.
Assume liability for movement, settlement, damage, or injury.
3. Cease operations and notify Architect immediately if safety of adjacent structures appears to be endangered; take precautions to properly support structures. Do not resume operations until safety is restored.
4. Prevent movement, settlement or collapse of adjacent services, sidewalks, driveways and trees. Assume liability for such movement, settlement, or collapse, promptly repair.
5. Obtain permission from adjacent property owners when outriggers, swinging cranes or similar equipment traverse their property.
B. Design/Build: Provide special engineering to ensure compliance with applicable codes and Contract Documents for shoring.
C. Scheduling: Do not close or obstruct roadways without permits. Conduct operations with minimum interference to adjacent traffic.
1.3 SUBMITTALS
A. Action Submittals: Submit demolition procedures and operational sequence to ensure Project sequencing is consistent with Owner needs.
7.j.2
Packet Pg. 409 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
02 41 10 - 2 Structure Demolition
B. Informational Submittal:
1. Submit copies of permits and notices authorizing demolition work.
2. Submit copies of certificates of severance of utility services.
3. Submit copies of permit for transport and disposal of debris.
C. Design/Build Certificates: Submit certification signed by California licensed structural engineer indicating shoring compliance with code requirements.
1.4 QUALITY ASSURANCE
A. Sustainability Requirements: Comply with CALGreen requirements including those relative to pollution control for construction waste.
1.5 SITE CONDITIONS
A. Structures to be demolished shall be evacuated and their use discontinued before start of work.
B. Arrange and pay for disconnecting or removing, capping, and plugging utility services; disconnect and stub off; notify affected utility company in advance and obtain approval before starting Work.
C. Place markers to indicate location of disconnected services; identify service lines and capping locations on Project Record Documents.
D. Maintain access to existing walkways, exits, and adjacent occupied facilities.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Debris: Maintain possession of materials being demolished except where noted as a material for reinstallation or a material to be retained by Owner. Immediately remove debris from site.
B. Materials for Reinstallation: Carefully remove, store, and protect materials indicated to be reinstalled. Contact Owner and Architect prior to beginning demolition to determine extent of other materials that might be suitable for reinstallation.
1. Materials for reinstallation include but are not limited to fire system alert system.
2. Inventory and record condition of items to be reinstalled.
C. Owner Retained Materials: Contact Owner prior to beginning demolition to determine extent of materials to be retained. Carefully remove materials indicated to be retained by Owner; deliver and store where directed.
1. Materials to be retained by Owner include but are not limited to fire system alert system.
2. Inventory and record condition of items to be retained by Owner.
7.j.2
Packet Pg. 410 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
02 41 10 - 3 Structure Demolition
PART 3 - EXECUTION
3.1 DEMOLITION
A. Demolish structures and appurtenances in an orderly and careful manner.
B. Perform demolition in accordance with authorities having jurisdiction.
1. Do not use explosives.
C. Keep work sprinkled to prevent dust; provide hoses and water as required for demolition. Coordinate potential availability of water from existing on-site water sources with Owner; do not use on-site water without prior written approval.
D. Remove demolished materials from site, unless otherwise directed.
1. Burning of materials on site is not permitted.
2. Remove from site, contaminated, vermin infested, or dangerous materials encountered and dispose of by safe means so as not to endanger health of workers or public.
E. Rough grade areas affected by demolition and leave level to within one percent; maintain grades and contours of site as indicated.
1. Backfill over excavated areas, open pits and holes caused by demolition operations which exceed excavation limits for Project; use approved fill.
F. Remove demolished materials, tools, and equipment upon completion of work; leave site in condition acceptable to Architect.
3.2 REPAIR
A. Repair damage to adjacent structures caused as result of demolition.
B. Repair demolition beyond that required for Project.
END OF SECTION
7.j.2
Packet Pg. 411 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION #16
02 41 13 - 1 Selective Site Demolition
SECTION 02 41 13
SELECTIVE SITE DEMOLITION
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. Remove paved asphalt concrete areas, concrete sidewalks, concrete ramps, utility pipes, utility appurtenances, light poles, light fixtures, bike racks, trees, and gate control arm equipment, as noted on the Drawings.
1.2 REQUIREMENTS
A. Prior to starting demolition, comply with requirements listed in the City of San Carlos General Conditions. Comply with BAAQMD and Environmental Protection Agency (EPA) regulations and disposal regulations.
1.3 RELATED WORK
A. Section 01 57 23: Temporary Storm Water Pollution Control B. Section 31 10 00: Clearing and Grubbing
C. Section 31 20 00: Earthwork
D. Section 31 22 19: Finish Grading
PART 2 - - PRODUCTS (NOT USED)
PART 3 - - EXECUTION
3.1 UTILITIES
A. Coordinate with utility companies as required.
B. Locate, identify, disconnect, and cap off utility services to be demolished.
C. Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated.
D. Maintain and protect existing utilities to remain in service before proceeding with demolition, providing bypass connections to other parts of the building.
E. Notify the City of San Carlos Representative not less than 72 hours in advance if there are any proposed utility interruptions
F. Do not proceed with utility interruptions without the City of San Carlos Representative’s written permission
7.j.2
Packet Pg. 412 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION #16
02 41 13 - 2 Selective Site Demolition
G. Where equipment or devices have been removed, and where the active side of the pipe remains, Contractor shall cap or plug all abandoned piping using either threaded or soldered fittings. Do not rely on the existing valves for a positive shutoff.
H. For the abandonment of wet utilities, Contractor shall cut and cap at the property line, remove everything behind the property line, disconnect lateral at mainline, and abandon in place the segment between mainline and property line. Contractor shall perform work as specified in the Drawings.
3.2 DEMOLITION
A. Conduct demolition without disrupting use of adjacent property or nearby buildings.
B. Conduct demolition operations and remove debris to prevent injury to people and damage to adjacent buildings and site improvements.
C. Perform Work in such a manner as to prevent damage to existing facilities to remain or to be salvaged. Hazardous Work shall not be left standing or hanging, but shall be knocked or pulled down to avoid damage or injury to employees or the public.
D. Conduct demolition operations in such a manner as to prevent damage to existing trees and plants that are to remain.
E. Contractor shall provide biologist survey prior to the demolition and removal of all existing trees.
F. Contractor shall coordinate with the City and the adjacent property owner prior to the removal of trees along the property line. A minimum of 7 days notice shall be provided prior to starting work.
G. If the removal of the trees takes place between February 1 and August 31, the contractor shall provide pre-construction survey performed by qualified biologist.
Refer to Specification CEQA memo.
H. Contractor shall be extremely cautious while removing trees, specifically to the existing traffic control cabinet and the existing carport on the adjacent property. The contractor shall be responsible for any damages to traffic control cabinet and carport caused by the contractor’s work.
I. Contractor shall be responsible for traffic control when performing any work in the street.
3.3 CUTTING AND PATCHING
A. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
3.4 SAW CUTTING
All saw cutting shall be made in a neat, clean line perpendicular to the face of the paved surface such that no damage shall take place on the paving to remain. Refer to plans for locations.
7.j.2
Packet Pg. 413 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION #16
02 41 13 - 3 Selective Site Demolition
3.5 SALVAGE
A. Items indicated to be removed and salvaged remain the City’s property. Remove, clean, and deliver to the City’s designated storage area or as directed by the City’s Representative.
3.6 DISPOSAL
A. Unless otherwise indicated, demolished materials become Contractor's property.
B. Promptly remove demolished materials from City’s property and legally dispose of them. Do not burn demolished materials.
C. After the demolition work is complete, the contractor shall remove and dispose of all excess materials from the demolition operations and other unwanted materials, garbage, debris, and rubbish scattered throughout the site and perform minor grading as directed by the Engineer to eliminate uneven ground surface. The restored sites shall have no significant depressed areas that may hold rain water.
3.7 HAZARDOUS MATERIALS
A. Except as otherwise specified, in the event Contractor encounters on the Project site material reasonably believed to be asbestos, polychlorinated biphenyl (PCB), lead, or other hazardous substances that have not been rendered harmless, Contractor shall immediately stop work in the area affected and report the condition to the City of San Carlos’s representative in writing. The work in the affected area shall not thereafter be resumed except by written agreement of the City and Contractor if in fact the material is asbestos, PCB, lead, or other hazardous substances and has not been rendered harmless. The work in the affected area shall be resumed in the absence of asbestos, PCB, lead, or other hazardous substances, or when such materials have been rendered harmless.
B. Disclose any hazardous substance or condition exposed during the work to the City’s Representative for decision or remedy.
END OF SECTION
7.j.2
Packet Pg. 414 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 1 Concrete Forming and Accessories
SECTION 03 10 00
CONCRETE FORMING AND ACCESSORIES
PART 1 – GENERAL
1.1 SUMMARY
A. Section Includes: All labor, materials and equipment and all operations required to complete all formwork as indicated on the drawings; to produce shapes and configurations as shown, as required; and as specified herein, including:
1. Forms, shores, bracing, removal and other operations as necessary for all cast-in-place concrete and masonry placed.
2. Setting and securing anchor bolts and other metal items embedded in concrete into formwork, using materials and layouts furnished and delivered to jobsite as specified under other sections.
B. Related Sections:
1. Pertinent Sections of Division 03 specifying concrete construction.
2. Pertinent Sections of other Divisions specifying work to be embedded in concrete or work penetrating concrete foundations and formwork.
1.2 REFERENCES
A. California Code of Regulations, Title 24, latest adopted edition (herein noted as CBC): Chapter 19 Concrete.
B. American Concrete Institute (ACI) 347 "Recommended Practice for Concrete Formwork".
C. American Plywood Association (APA) “Concrete Forming Guide”.
D. West Coast Lumberman Inspection Bureau (WCLIB) “Standard Grading Rules for West Coast Lumber”.
E. ACI SP-066 “ACI Detailing Manual”.
F. ACI 301 “Specifications for Structural Concrete”.
G. Concrete Reinforcing Steel Institute (CRSI) “Manual of Standard Practice”.
1.3 DESIGN REQUIREMENTS
A. Design, engineer, and construct formwork, shoring and bracing to conform to design and code requirements, resist imposed loads; resultant concrete to conform to required shape, line and dimension.
1.4 SUBMITTALS
A. Limitation of review: Structural Engineer's review will be required only where specifically requested for general architectural applications and features only.
Contractor is responsible for structural stability, load-resisting characteristics and sufficiency of form work design.
7.j.2
Packet Pg. 415 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 2 Concrete Forming and Accessories
1.5 QUALITY ASSURANCE
A. General: All form materials shall be new at start of work. Produce high quality concrete construction. Minimize defects due to joints, deflection of forms, roughness of forms, nonconforming materials, concrete or workmanship.
B. Reuse of Forms: Plywood forms may be reused, if thoroughly cleaned of all dirt, mortar, and foreign materials, and undamaged at edges and contact face.
Reuse shall be subject to permission from the Architect without exception, and issued in writing. Reuse of any panel which will produce a blemish on exposed concrete, will not be permitted.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Form Materials:
1. Non-Exposed Surface Formwork Facing: Forms for concrete which is not exposed to view, may be of plywood as specified for exposed surfaces, or square edge 1x nominal Douglas Fir, Construction Grade, S4S.
2. Exposed Surface Formwork Facing:
a. Forms for all exterior and interior concrete flat surfaces unless otherwise specified as board formed shall be new Douglas Fir Plywood (APA) ply, 5/8-inch, B-B Plyform, Class 1, Exterior Type, oiled and edged and edge-sealed conforming to U.S. Product Standard PS 1 in large sheet sizes to achieve joint patterns shown.
b. All exposed concrete edges shall be chamfered 3/4" minimum or as noted on the drawings.
3. Exposed Surface Formwork - Special Pattern Form Liner:
a. Forms for all exterior and interior concrete flat surfaces indicated shall be as designated by Architect.
B. Earth Forms: Allowed, subject to soil standing in excavations without ravel or caving.
C. Form Release Agent: Spray-on compound, not affecting color, bond or subsequent treatment of concrete surfaces. Maximum VOC content shall comply with local requirements and California Green Building Code.
D. Accessories: Types recommended by manufacturers or referenced standards to suit conditions indicated;
1. Anchors, spacers, void in-fill materials: sized to resist imposed loads.
2. Form Ties: Prefabricated rod, flat band, or wire snap ties with 1" breakback or threaded internal disconnecting type with external holding devices of adequate bearing area. Ties shall permit tightening and spreading of forms and leave no metal closer than 1" to surface.
E. Corner Chamfers and Rustications: Filleted, wood strip or foam type; sizes and shapes as detailed, or 3/4 x 3/4 inch size minimum if not detailed; maximum possible lengths.
7.j.2
Packet Pg. 416 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 3 Concrete Forming and Accessories
F. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Sized as required, of sufficient strength and character to maintain formwork in place while placing concrete.
PART 3 – EXECUTION
3.1 EXAMINATION
A. Inspect the substrate and the conditions under which concrete formwork is to be performed. Correct conditions detrimental to timely and proper completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected. Commencement of work indicates acceptance of substrates and conditions.
B. Verify lines, levels and centers before proceeding with formwork. Ensure that dimensions agree with drawings.
3.2 EARTH FORMS
A. If natural soil or compacted fill can be accurately cut and maintained, foundations and grade beams may be poured against earth without forming. Provide positive protection of trench top corners.
B. Maintain earth forms free of water and foreign materials.
3.3 ERECTION – FORMWORK
A. General: Construct formwork in accordance with calculations, and recommendations of Chapter 3 of ACI 347. Construct forms to the sizes, shapes, lines and dimensions shown, and as required to obtain accurate alignment, location, grades, level and plumb work in finished structure. Provide for openings, offsets, sinkages, keyways, recesses, moldings, rustications, reglets, chamfers, blocking, screeds, bulkheads, anchorages and inserts, and other features required. Use selected materials to obtain required finishes.
1. Construct cambers specified in concrete members and slabs in the formwork.
2. Schedule the work and notify other trades in ample time so that provisions for their work in the formwork can be made without delaying progress of the project. Install all sleeves, pipes, etc. for building services systems, or other work. Secure information about and provide for all openings, offsets, recessed nailing blocks, channel chases, anchors, ties, inserts, etc. in the formwork before concrete placement.
3. Deflection: Formwork and concrete with excessive deflection after concrete placement will be rejected. Excessive deflection is that which will produce visible and noticeable waves in the finished concrete.
4. Measure formwork for elevated structural slabs, columns, wall elevations points of maximum camber and submit in writing to the
Architect/Engineer prior to placing concrete.
B. Formwork Construction: Erect formwork, shoring and bracing to achieve design requirements, in accordance with requirements of ACI 301. Uniform, substantial and sufficiently tight to prevent leakage of concrete paste, readily removable without impact, shock or damage to cast-in-place concrete surfaces and adjacent materials. Tie, brace, shore, and support to insure stability against
7.j.2
Packet Pg. 417 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 4 Concrete Forming and Accessories
pressures from any source, without failure of any component part and without excessive deflection. Solidly butt joints and provide backup material at joints as required to prevent leakage and fins.
C. Provide all openings, offsets, inserts, anchorages, blocking, and other features of the work as shown or required. See INSERTS, EMBEDDED PARTS, AND OPENINGS for detailed requirements.
D. Warped, checked, or scuffed forms will be rejected.
E. Maintain membranes, reinforcing and other work free of damage; protect with plywood runway boards or other positive, durable means.
F. Align joints and make watertight. Keep form joints to a minimum.
G. Provide fillet and chamfer strips on external corners of exposed locations and as indicated to form patterns in finished work. Extend patterns around corners and into alcoves, on backs of columns and similar locations not otherwise shown.
1. Produce beveled, smooth, solid, unbroken lines, except as otherwise indicated to conform to patterns.
2. Form corners and chamfers with 3/4 inch x 3/4 inch strips, unless otherwise indicated, accurately formed and surfaced to produce uniformly straight lines and tight edge joints. Extend terminal edges to required limit and miter chamfer at changes in direction.
H. Unexposed corners may be formed either square or chamfered.
I. Ties and Spreaders: Arrange in a pattern acceptable to the Architect when exposed. Snap-ties may be used except at joints between pours where threaded internal disconnecting type shall be used.
J. Coordinate this section with other sections of work that require attachment of components to formwork.
K. Reglets and Rebates: Accurately locate, size, and form all reglets and rebates required to receive work of other trades, including flashing, frames, and equipment.
3.4 APPLICATION - FORM RELEASE AGENT
A. Apply form release agent on formwork in accordance with manufacturer's recommendations.
B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.
C. Do not allow excess form coating material to accumulate in the forms or to come into contact with reinforcement or surfaces which will be bonded to fresh concrete.
D. Coat steel forms with a non-staining, rust-preventative form oil or otherwise protect against rusting. Rust-stained steel formwork will be rejected.
7.j.2
Packet Pg. 418 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 5 Concrete Forming and Accessories
E. Leave no residue or stain on the face of the concrete, nor affect bonding of subsequent finishes or work specified in other sections.
3.5 INSERTS, EMBEDDED PARTS, AND OPENINGS
A. Provide formed openings where required for items to be embedded in passing through concrete work.
1. Provide openings in concrete formwork to accommodate work of other sections including those under separate contracts (if any). Size and location of openings, recesses and chases shall be in accordance with the section requiring such items. Accurately place and securely support items to be built into forms.
B. Construction Joints: Construct and locate generally as indicated on Drawings and only at locations approved by Structural Engineer, so as not to impair the strength of the structure. Form keys in all cold joints shown or required.
C. Locate and set in place items that will be cast directly into concrete.
D. Rough Hardware and Miscellaneous Metal: Set inserts, sleeves, bolts, anchors, angles, and other items to be embedded in concrete. Set embedded bolts and sleeves for equipment to template and approved shop drawings prepared by trades supplying equipment.
E. Coordinate with work of other sections in forming and placing openings, slots, reglets, recesses, sleeves, bolts, anchors, other inserts, and components of other work.
F. Wood Inserts and Nailers: Provide approved preservative-treated lumber. Set all required nailing blocks, grounds, and other inserts as required to produce results shown. Wood plugs shall not be used.
G. Install accessories in accordance with manufacturer's instructions, so they are straight, level, and plumb. Ensure items are not disturbed during concrete placement.
H. Piping: Do not embed piping in structural concrete unless locations specifically approved by Structural Engineer.
I. Conduit: Place conduit below slabs-on-grade and only as specifically detailed on structural drawings. Minimum clear distance between conduits shall be 3 diameters. Location shall be subject to Engineer's written approval and shall not impair the strength of the structure.
J. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection. Locate openings at bottom of forms to allow flushing water to drain.
1. Provide openings for the introduction of vibrators at intervals necessary for proper placement.
2. Close temporary openings with tight fitting panels, flush with inside face of forms, and neatly fitted so joints will not be apparent in exposed concrete surfaces.
7.j.2
Packet Pg. 419 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 6 Concrete Forming and Accessories
K. Install Form Liner inserts in accordance with manufacturer's recommendations, to produce patterns and textures indicated.
L. Install waterstops in accordance with manufacturer's recommendations to provide continuous waterproof barrier.
3.6 FORM CLEANING
A. Clean forms as erection proceeds, remove foreign matter within forms.
B. Clean formed cavities of debris prior to placing concrete.
1. Remove all dirt, chips, sawdust, rubbish, water and foreign materials detrimental to concrete.
2. Flush with water or use compressed air to remove remaining foreign matter. Ensure that water and debris drain to exterior through clean-out ports.
3.7 FOOTINGS
A. Verify elevations and provide final excavation required for footings prior to placing of concrete.
3.8 EQUIPMENT BASES
A. Form concrete bases for all mechanical and electrical equipment in accordance with approved shop details furnished by other sections.
B. Sizes and locations as indicated and as required to produce results shown.
C. Provide coved base for all equipment bases placed on concrete slabs.
3.9 FORMWORK TOLERANCES
A. Construct formwork to maintain tolerances required by ACI 301.
3.10 FIELD QUALITY CONTROL
A. Inspect erected formwork, shoring, and bracing to ensure that work is in accordance with formwork design, and to verify that supports, fastenings, wedges, ties, and items are secure.
B. Do not reuse wood formwork more than 2 times for concrete surfaces to be exposed to view. Do not patch formwork.
C. Clean and repair surfaces to be re-used in the work. Split, frayed, delaminated or otherwise damaged form facing material will not be acceptable. Apply new form coating compound material to concrete contact surfaces as specified for new formwork.
D. When forms are extended for successive concrete placement, thoroughly clean surfaces, remove fins and laitance, and tighten forms to close all joints. Align and secure joints to avoid offsets.
3.11 FORM REMOVAL
7.j.2
Packet Pg. 420 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 7 Concrete Forming and Accessories
A. Do not loosen or remove forms before minimum curing period has elapsed without employment of appropriate alternate curing methods, approved by the Architect in writing.
B. Remove forms without damage to the concrete using means to insure complete safety of the structure and without damage to exposed beams, columns, wall edges, chamfers and inserts. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.
C. Do not remove forms until the concrete has hardened sufficiently to permit safe removal and the concrete has attained sufficient strength to safely support imposed loads. The minimum elapsed time for removal of forms after concrete has been placed shall be as follows:
1. Columns and Walls: 7 days, provided members are not subjected to overhead loads.
2. Retaining Walls: 21 days minimum.
3. Footings: 7 days minimum. If backfilled immediately, side forms may be removed 24 hours after concrete is placed.
4. Beams, elevated slab, and similar overhead conditions: 28 days unless adequate shoring is provided.
D. Durations listed above are minimums and are subject to extension at the sole judgment of the Architect/Engineer.
E. Reshoring: Reshore members where and if required by Formwork Design Engineer.
F. Do not subject concrete to superimposed loads (structure or construction) until it has attained full specified design strength, nor for a period of at least 14 days after placing.
G. Store removed forms to prevent damage to form materials or to fresh concrete.
Discard damaged forms.
3.12 CLEANING
A. Remove excess material and debris associated with this work from the job site.
END OF SECTION
7.j.2
Packet Pg. 421 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 10 00 - 8 Concrete Forming and Accessories
BLANK
7.j.2
Packet Pg. 422 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 1 Concrete Reinforcing
SECTION 03 20 00
CONCRETE REINFORCING
PART 1 – GENERAL
1.1 SUMMARY
A. Section Includes:
1. Reinforcing steel work for all concrete and masonry work as indicated on the drawings and specified herein.
2. Coordinate this work with other work affected by these operations, such as forms, electrical work, mechanical work, structural steel, masonry and concrete.
B. Related Sections:
1. Pertinent Sections of Division 01 specifying Quality Control and Testing Laboratory services.
2. Pertinent Sections of Divisions 03 specifying concrete construction.
3. Pertinent Sections of Divisions 04 specifying masonry construction.
4. Pertinent Sections of other Divisions specifying work to be embedded in concrete or work penetrating concrete work.
1.2 REFERENCE STANDARDS
A. California Code of Regulations, Title 24, latest adopted edition (herein noted as CBC) Chapter 19 Concrete.
B. American Concrete Institute (ACI) 301 “Specifications for Structural Concrete for Buildings”.
C. ACI 318 “Building Code Requirements for Reinforced Concrete and Commentary”.
D. ACI SP-066 “ACI Detailing Manual”.
E. American Society for Testing and Materials (ASTM) A1064 “Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete”.
F. ASTM A615 “Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement”.
G. ASTM A706 “Standard Specification for Deformed and Plain Low-Alloy Steel Bars for Concrete Reinforcement”.
H. American Welding Society (AWS) D1.4 – “Structural Welding Code for Reinforcing Steel”.
I. Concrete Reinforcing Steel Institute (CRSI) - “Manual of Standard Practice”.
J. CRSI - “Placing Reinforcing Bars”.
1.3 SUBMITTALS
7.j.2
Packet Pg. 423 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 2 Concrete Reinforcing
A. Submit in accordance with pertinent sections of Division 01 specifying submittal procedures. Submit for review prior to fabrication.
B. Limitation of Review: Structural Engineer's review will be for general conformance with design intent as indicated in the Contract Documents and does not relieve Contractor of full responsibility for conformance with the Contract Documents. The General Contractor shall review and approve shop drawings prior to submittal to the Architect/Engineer.
C. Shop Drawings: Show complete fabrication and placing details of all reinforcing steel. Comply with requirements of ACI SP-66. Include:
1. Bar sizes and schedules;
2. Shapes of bent bars, layout and spacing of bars, location of splices.
3. Stirrup spacing, arrangements and assemblies,
4. References to Contract Document detail numbers and designations.
5. Wall elevations corresponding to elevations shown in Contract Documents.
D. Product Data: Submit manufacturer's product data, specifications, location and installation instructions for proprietary materials and reinforcement accessories.
Provide samples of these items upon request.
E. Certificates: Submit all certifications of physical and chemical properties of steel for each heat number as manufactured, including location of material in structure as specified below in Article titled QUALITY ASSURANCE. All materials supplied shall be tagged with heat numbers matching submitted Mill Test Report analyses.
F. Samples: Provide to the Owner's Testing laboratory as specified in Article SOURCE QUALITY CONTROL.
1.4 QUALITY ASSURANCE
A. Perform work of this Section in accordance with the CRSI “Manual of Standard Practice”, CRSI “Placing Reinforcing Bars”, ACI 301, and ACI 318.
B. Requirements of Regulatory Agencies, refer to pertinent Sections of Division 01 and CBC.
C. Certification and Identification of Materials and Uses: Provide Owner's Testing Agency with access to fabrication plant to facilitate inspection of reinforcement.
Provide notification of commencement and duration of shop fabrication in sufficient time to allow inspection and all material identification/test information listed below.
1. Provide manufacturer's Mill Test Reports for all materials. Include chemical and physical properties of the material for each heat number manufactured. Tag all fabricated materials with heat number.
2. Provide letter certifying all materials supplied are from heat numbers covered by supplied mill certificates. Include in letter the physical location of each grade of reinforcing and/or heat number in the project (i.e. foundations, walls, etc.).
7.j.2
Packet Pg. 424 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 3 Concrete Reinforcing
3. Unidentified Material Tests: Where identification of materials by heat number to mill tests cannot be made, Owner's Testing Agency shall test unidentified materials as described below.
D. Testing and Inspection: Tests and Inspections required by Independent Testing Agency are specified below in Articles SOURCE QUALITY CONTROL and FIELD QUALITY CONTROL. Duties and limitations of Independent Testing Agency, test costs and test reports in conformance with pertinent Sections of Division 01.
1.5 DELIVERY, STORAGE AND HANDLING
A. Comply with pertinent requirements of Division 01.
B. Deliver reinforcement to project site in bundles marked with durable tags indicating heat number, mill, bar size and length, proposed location in the structure and other information corresponding with markings shown on placement diagrams.
C. Handle and store materials above ground to prevent damage, contamination or accumulation of dirt or rust.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Reinforcing Steel: Deformed billet steel bars, ASTM A706 Grade 60 or ASTM A615 Grade 60.
1. Exception: Bars #3 and smaller shall be Grade 40 minimum, unless otherwise noted on the drawings.
2. Welded reinforcement shall be ASTM A706, or A615 meeting carbon requirements of AWS D1.4. Welding shall conform with AWS D1.4.
3. All reinforcement to be unfinished.
4. ASTM A615 reinforcement at special structural concrete walls, concrete coupling beams, and special concrete moment frames shall have maximum yield stress of 78,000 psi and the tensile strength shall be greater than 125% of the actual yield strength. Test ASTM A615 reinforcement for conformance to these criteria prior to fabrication and/or installation.
B. Welded Wire Reinforcement: ASTM A1064.
C. Tie Wire: No. 16 AWG or heavier, black annealed.
D. Concrete Blocks: On-grade conditions only, as required to support reinforcing bars in position.
E. Reinforcing Supports: Plastic or galvanized steel chairs, bolsters, bar supports, or spacers sized and shaped for adequate support of reinforcement and construction loads imposed during concrete placement, meeting ACI and CRSI standards.
1. For use over formwork: Galvanized wire bar type supports complying with CRSI recommendations. Provide plastic tips where exposed to view
7.j.2
Packet Pg. 425 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 4 Concrete Reinforcing
or weather after removal of formwork. Do not use wood, brick, or other unacceptable materials.
F. Reinforcement Splice Couplers: For use only where specified on drawings.
Submit other locations proposed for use to Engineer for review. "L-Series Bar Lock" Coupler Systems for Splicing Reinforcement Bars, UES ER-0319, by Dayton-Superior Corporation.
2.2 FABRICATION
A. Fabricate concrete reinforcing in accordance with CRSI (DA4), unless specifically shown otherwise. Details not specifically shown or indicated shall conform to SP-066 and specified codes and standards.
1. Accurately shop-fabricate to shapes, bends, sizes, gauges and lengths indicated or otherwise required.
2. Bend bars once only. Discard bars improperly bent due to fabricating or other errors and provide new material; do not re-bend or straighten unless specifically indicated. Rebending of reinforcement in the field is not allowed.
3. Do not bend reinforcement in a manner that will injure or weaken the material or the embedding concrete.
4. Do not heat reinforcement for bending. Heat-bent materials will be rejected.
B. Unacceptable materials: Reinforcement with any of the following defects will not be permitted in the work.
1. Bar lengths, depths and bends exceeding specified fabrication tolerances.
2. Bends or kinks not indicated on Drawings or final shop drawings.
3. Bars with reduced cross-section due to rusting or other cause.
C. Tag reinforcement with durable identification to facilitate sorting and placing.
D. Shop Fusion Welded Stirrup/Tie/Spiral Cages
1. Shop fusion welding of stirrup/tie/spiral cages is permitted to aid in fabrication and handling. The following requirements shall be met.
2. All reinforcing bars receiving weld shall be ASTM A706.
3. Longitudinal holding wires shall be ASTM A1064.
4. Shop welding shall be performed by machines under a continuous, controlled process.
5. Quality control tests shall be performed on shop-welded specimens and the test results shall be available, upon request, to the Architect/Engineer.
6. Tack welding of reinforcing steel is not permitted.
7. Welding of any type shall not occur at 90°, 135°, or 180° bends. Circular ties and spirals may be shop fusion welded outside of areas with 90°, 135°, or 180° hook bends.
8. Longitudinal bars shall not be welded to stirrups/ties/spirals.
2.3 SOURCE QUALITY CONTROL
A. The Testing Agency, as specified in the Article QUALITY ASSURANCE, will perform the following:
7.j.2
Packet Pg. 426 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 5 Concrete Reinforcing
1. Material Testing:
a. Identified Steel: When samples are taken from bundled steel identified by heat number, matched with accompanying mill analyses as delivered from the mill, supplemental testing of reinforcing steel is not required.
b. Unidentified Steel: When identification of materials by heat number matched to accompanying mill analyses cannot be made, perform one tensile test and one bend test per each two and onehalf tons or fraction thereof for each required size of reinforcing steel. Tests of unidentified steel shall be performed by the Owner's Testing Agency and costs for these tests shall be paid by the Contractor by deductive change order.
PART 3 – EXECUTION
3.1 EXAMINATION
A. Inspect the conditions under which concrete reinforcement is to be placed. Do not proceed with the work until unsatisfactory conditions have been corrected.
B. Coordinate with work of other sections to avoid conflicts or interference. Bring conflicts between reinforcement and other elements to Architect's attention.
Resolve conflicts before concrete is placed.
C. Notify Architect, Structural Engineer, and Authority Having Jurisdiction for review of steel placement not less than 48 hours before placing concrete.
3.2 PLACEMENT
A. General: Comply with the specified codes and standards, and Concrete Reinforcing Steel Institute recommended practice for "Placing Reinforcing Bars", for details and methods of reinforcement placement and supports, and as herein specified.
B. Clean bars free of substances which are detrimental to bonding. Maintain reinforcement clean until embedded in concrete.
C. Place reinforcement to obtain the minimum coverages for concrete protection.
Do not deviate from required position. Maintain required distance, spacing and clearance between bars, forms, and ground.
D. Location and Support: Provide metal chairs, runners, bolsters, spacers and hangers, as required.
E. Provide additional steel reinforcement as necessary or as directed, to act as spreaders or separators to maintain proper positioning.
F. Tying and Attachment: Securely tie at all intersections and supports with wire.
Prevent dislocation or movement during placement of concrete. Direct twisted ends of wire ties away from exposed concrete surfaces.
G. Separate reinforcing from pipes or conduits with approved non-metallic separators. Do not use wood or steel form stakes or reinforcement used as stakes as support for reinforcement.
7.j.2
Packet Pg. 427 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 6 Concrete Reinforcing
H. Accommodate placement of formed openings required by other sections.
I. Obstructions:
1. Where obstructions, block-outs, or penetrations (conduits, raceways, ductwork) prevent continuous placement of reinforcement as indicated, provide additional reinforcing as detailed and as directed by the Structural Engineer to supplement the indicated reinforcement around the obstruction.
2. Place additional trim bars, ties, stirrups, or other elements as detailed and as directed at all opening, sleeves, pipes or other penetrations through structural elements.
J. Welded Wire Reinforcement: Reinforce slabs with 6"x 6"-W1.4 x W1.4 welded wire reinforcement reinforcing, unless otherwise noted on drawings.
1. Provide flat sheets only, no rolls. Straighten, cut to required size, and lay out flat in place.
2. Securely wire-tie reinforcement to other reinforcement at frequent intervals.
3. Extend reinforcement over supporting beams and walls, and to within 1 inch of edge of slabs, construction joints, and expansion joints.
4. Support reinforcement in mid-depth of slab.
5. Lift reinforcement at intervals as slab concrete is placed, ensure proper embedment.
3.3 REINFORCING SPACING AND COVERAGE
A. Spacing: Do not space bars closer than four (4) diameters of the largest of two adjacent bars, except at bar laps, which shall be placed such that a minimum of 2 bar diameters is clear between bars.
B. Where reinforcing in members is placed in two layers, the distance between layers shall not be less than four bar diameters of the largest bar and the bars in the upper layers shall be placed directly above those in the bottom layer, unless otherwise detailed or dimensioned.
C. Coverage of bars (including stirrups and columns ties) shall be as follows, unless otherwise shown:
1. Footings and Mat Foundation: 3 inches to any soil face, 2 inches to top.
2. Slabs (on grade): 2 inches to grade face, 1-1/2 inches to top face.
3. Slabs (elevated): 1-1/2 inches top and bottom.
4. Beam & Column: 1-1/2inches to form.
5. Walls: 1-1/2 inches clear to form and 2 inches clear to form at soil face.
3.4 DOWELS, SPLICES, OFFSETS AND BENDS
A. Provide standard reinforcement splices at splices, corners, and intersections by lapping ends, placing bars in contact, and tightly tying with wire at each end.
Comply with details shown on structural drawings and requirements of ACI 318.
B. Provide minimum 1-1/2 inch clearance between sets of splices. Stagger splices in horizontal bars so that adjacent splices will be 4 feet apart.
7.j.2
Packet Pg. 428 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 7 Concrete Reinforcing
C. Laps of welded wire reinforcement shall be at least two times the spacing of the members in the direction lapped but not less than twelve inches.
D. Splices of reinforcement shall not be made at points of maximum stress. Provide splice lengths as noted on the structural drawings, with sufficient lap to transfer the stress between bars by bond and shear.
E. Spacing:
1. Space bars minimum distance specified and all lapped bars 2 bar diameters (minimum) clear of the next bar.
2. Stagger splices of adjacent bars where possible and where required to maintain bar clearance.
3. Beam or slab top bars shall be spliced mid-span of column support and bottom bars spliced at column supports.
4. Request Architect/Engineer review prior to placement for all splices not shown on the drawings.
F. Reinforcement Couplers: Install at all locations indicated. Install couplers in accordance with manufacturer’s recommendations.
3.5 WELDING
A. No reinforcing shall be welded unless specifically indicated. No reinforcing shall be welded without prior approval of the Structural Engineer and the Authority Having Jurisdiction.
B. Only when so approved for use as noted above, all welding shall conform to AWS D1.4, ACI 318 Section 26.6.4, and the following;
1. All welding performed by certified welders.
2. All reinforcement requires preheat prior to welding. All preheat and welding shall be continuously inspected by the Testing Agency.
3.6 MISPLACED REINFORCEMENT
A. Notify Architect/Engineer immediately if reinforcing bars are known to be misplaced after concrete has been placed.
B. Perform no correction or cutting without specific direction. Do not bend or kink misplaced bars.
C. Correct misplaced reinforcing only as directed in writing by the Architect/Engineer. Bear all costs of redesign, new, or additional reinforcing required because of misplaced bars at Contractor's expense.
3.7 FIELD QUALITY CONTROL
A. The Testing Agency as specified in the Article QUALITY ASSURANCE, will inspect the work for conformance to contract documents before concrete placement.
1. Inspection: Provide inspection and verification of installed reinforcement.
Confirm that the surface of the rebar is free of form release oil or other coatings.
7.j.2
Packet Pg. 429 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 20 00 - 8 Concrete Reinforcing
2. Inspect all preheat and welding activities for steel reinforcement when these occur.
3. Exception: Shallow foundations & non-structural slabs-on-grade supporting buildings of no greater than three stories and either of concrete design strength 2500psi (or greater) or supporting light-frame construction do not require special inspection. Non-structural patios, driveways, and sidewalks do not require special inspection.
3.8 CLEANING
A. Remove excess material and debris associated with this work from the job site.
END OF SECTION
7.j.2
Packet Pg. 430 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 1 Cast-in-Place Concrete
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 – GENERAL
1.1 SUMMARY
A. Section Includes: Provide all labor, materials, equipment and services to complete all concrete work required, including, but not limited to, the following:
1. Foundations and slabs-on-grade.
2. Installation of all bolts, inserts, sleeves, connections, etc. in the concrete.
3. Joint devices associated with concrete work.
4. Miscellaneous concrete elements, including, but not limited to: equipment pads, light pole bases, flagpole bases, thrust blocks, and manholes.
5. Concrete curing.
6. Coordination with other sections:
a. Make all preparations and do all work necessary to receive or adjoin other work. Install all bolts and anchors, including those furnished by other sections, into formwork and provide all required blocking.
b. Install all accessories embedded in the concrete and provide all holes, blockouts and similar provisions necessary for the work of other sections. Provide all patching or cutting made necessary by failure or delay in complying with this requirement at the Contractor's expense.
c. Coordinate with other sections for the accurate location of embedded accessories.
B. Related Sections:
1. Pertinent Sections of Division 01 specifying Quality Control and Testing Laboratory services.
2. Pertinent Sections of Division 03 specifying concrete construction.
3. Pertinent Sections of other Divisions specifying work to be embedded in concrete or work penetrating concrete.
4. Pertinent sections of other Divisions specifying floor finishes and sealants applied to concrete substrates.
5. 03 35 50 Polished Concrete Flooring for concrete coloring, polishing, and finishing.
1.2 REFERENCES
A. California Code of Regulations, Title 24, latest adopted edition (herein noted as CBC) Chapter 19 Concrete.
B. American Concrete Institute (ACI) 211.1 “Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete”; ACI 211.2 “Standard Practice for Selecting Proportions for Lightweight Concrete”.
C. ACI 301 “Specifications for Structural Concrete”.
D. ACI 302.1R “Guide for Concrete Floor and Slab Construction”.
E. ACI 304R “Guide for Measuring, Mixing, Transporting, and Placing Concrete”.
7.j.2
Packet Pg. 431 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 2 Cast-in-Place Concrete
F. ACI 305R “Hot Weather Concreting”.
G. ACI 306R “Cold Weather Concreting”.
H. ACI 308 “Standard Practice for Curing Concrete”.
I. ACI 318 “Building Code Requirements for Reinforced Concrete and Commentary”.
1.3 SUBMITTALS
A. Submit in accordance with pertinent sections of Division 01 specifying submittal procedures. The General Contractor shall review and approve shop drawings prior to submittal to the Architect/Engineer. Submittals that do not meet these requirements will be returned for correction without review. Submit for review prior to fabrication.
B. Limitation of Review: Structural Engineer's review will be for general conformance with design intent as indicated in the Contract Documents and does not relieve Contractor of full responsibility for conformance with the Contract Documents.
C. Product Data: Submit manufacturers' data on manufactured products and other concrete related materials such as bond breakers, cure/sealer, admixtures, etc.
Demonstrate compliance with specified characteristics. Provide samples of items upon request.
D. Mix Designs: Submit Mix Designs for each structural concrete type required for work per requirements of articles CONCRETE MIXES and QUALITY ASSURANCE. Resubmit revised designs for review if original designs are adjusted or changed for any reason. Non-Structural mixes need not be submitted for review by Structural Engineer.
E. Shop Drawings: Proposed location of construction and cold joints. Proposed location of all slab construction/dowel joints, control joints, and blockouts.
F. Manufacturer's Installation Instructions: Indicate installation procedures and interface required with adjacent construction for concrete accessories.
G. Batch Plant Certificates: Include with delivery of each load of concrete. Provide Certificates to the Testing Agency and the Architect/Engineer as separate submittals. Concrete delivered to the site without such certificate shall be rejected and returned to the plant. Each certificate shall include all information specified in Article SOURCE QUALITY CONTROL below.
H. Engineering Analysis: Prepared by a California-licensed Civil or Structural Engineer, justifying construction-imposed loads on slabs, beams, and walls which exceed those allowed by CBC for the specified use.
1. 2000 lbs maximum allowable construction load without analysis.
2. 10,000 lbs maximum allowable construction load with analysis.
I. Project Record Documents: Accurately record actual locations of embedded utilities and components that will be concealed from view upon completion of concrete work.
7.j.2
Packet Pg. 432 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 3 Cast-in-Place Concrete
1.4 QUALITY ASSURANCE
A. Perform work of this section in accordance with ACI 301 and ACI 318.
B. Concrete construction verification and inspection to conform to CBC 1705.3.
C. Common Sourcing: Provide each of the following materials from a single source for entire project.
1. Cement.
2. Fly ash.
3. Aggregate.
D. Follow recommendations of ACI 305R when concreting during hot weather.
Follow recommendations of ACI 306R when concreting during cold weather.
E. Services by the Independent Testing Agency (includes "Special" Inspections) as specified in this Section and as follows:
1. Perform tests and inspections specified below in articles SOURCE QUALITY CONTROL and FIELD QUALITY CONTROL. Duties and
limitations of Independent Testing Agency, test costs and reports to be in conformance with pertinent Sections of Division 01.
F. Contractor shall bear the entire cost of remediation, removal, and/or replacement of concrete determined defective or non-conforming, including Architect/Engineer fees for redesign.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Materials specified by brand name shall be delivered in unbroken packages bearing manufacturer's label and shall be brand specified or an approved equal.
B. Delivery, Handling and Storage of other materials shall conform to the applicable sections of the current editions of the various reference standards listed in this Section.
C. Protect materials from weather or other damage. Sort to prevent inclusion of foreign materials.
D. Specific Requirements:
1. Cement: Protect against dampness, contamination, and warehouse set.
Store in weather tight enclosures.
2. Aggregates: Prevent excessive segregation, or contamination with other materials or other sizes of aggregates. Use only one supply source for each aggregate stock pile.
3. Admixtures:
a. Store to prevent contamination, evaporation, or damage. b. Protect liquid admixtures from freezing and extreme temperature ranges.
c. Agitate emulsions prior to use.
1.6 ENVIRONMENTAL REQUIREMENTS
A. Cold Weather (Freezing or near-freezing temperatures) per ACI 306R:
7.j.2
Packet Pg. 433 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 4 Cast-in-Place Concrete
1. Heat concrete materials before mixing, as necessary to deposit concrete at a temperature of at least 50°F but not more than 90°F.
2. Do not place concrete during freezing, near-freezing weather, snow, rain or sleet unless protection from moisture and/or cold is provided.
3. Protect from freezing and maintain at a temperature of at least 50°F for not less than seven days after placing. Take special precautions to protect transit-mixed concrete.
4. No salts, chemical protection or admixture are permitted without written approval of Architect/Engineer.
5. Contractor shall maintain an air temperature log for the first 7 days after placement with entry intervals not to exceed 8 hours.
B. Hot Weather per ACI 305R:
1. Cool concrete materials before mixing, or add ice in lieu of mix water as necessary to deposit concrete at a temperature below 85°F.
2. Do not place concrete in hot/windy weather without Architect/ Engineer review of procedures.
3. Provide sunshades and/or wind breakers to protect flat work during finishing and immediate curing operations. Do not place flatwork concrete at air temperature exceeding 90°F.
4. Provide modified mix designs, adding retarders to improve initial set times and applying evaporation reducers during hot/windy weather for review by Independent Testing Agency prior to use.
1.7 MOCK-UP
A. Construct and erect mock-up panel for architectural concrete surfaces indicated to receive special treatment or finish, as result of formwork.
1. Panel Size: Sufficient to illustrate full range of treatment.
2. Number of Panels: 2.
3. Locate as indicated on drawings.
B. If requested by Architect / Engineer, cast concrete against mock-up panel.
Obtain acceptance of resulting surface finish prior to erecting formwork.
C. Accepted mock-up panel is considered basis of quality for the finished work.
Keep mock-up exposed to view for duration of concrete work.
D. Mock-up may remain as part of the Work.
1.8 SCHEDULING AND SEQUENCING
A. Organize the work and employ shop and field crew(s) of sufficient size to minimize inspections by the Testing Agency.
B. Provide schedule and sequence information to Testing Agency in writing upon request. Update information as work progresses.
PART 2 – PRODUCTS
2.1 FORMWORK
A. Comply with requirements of Section 03 1000.
2.2 REINFORCEMENT
7.j.2
Packet Pg. 434 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 5 Cast-in-Place Concrete
A. Comply with requirements of Section 03 2000.
2.3 MATERIALS
A. General Requirements: All materials shall be new and best of their class or kind.
All materials found defective, unsuitable, or not as specified, will be condemned and promptly removed from the premises.
B. Cementitious Materials:
1. Portland Cement: ASTM C150, Type II, low alkali conforming to CBC 1903.1.
2. Fly Ash (Pozzolan): ASTM C618, Class F.
C. Concrete Aggregates:
1. Coarse and Fine Aggregates: ASTM C33; Stone aggregate and sand.
Specific source aggregate and/or sand or shrinkage characteristics as required for class of concrete specified.
2. Lightweight aggregate: ASTM C330 and C332.
3. Source shall remain constant throughout the duration of the job. The exact portions of the fine aggregates and coarse aggregates to be used in the mix shall be determined by the mix design.
D. Water: Potable, clean, from domestic source.
E. Admixtures: All admixtures shall be used in strict accordance with the manufacturer's recommendations. Admixtures containing calcium chlorides or other accelerators shall not be used without the approval of the Architect/Engineer and the Owner's Testing Laboratory.
1. Mid-Range Water Reducing Admixtures: ASTM C494 Type A, "MasterPolyHeed" (formerly “PolyHeed”) series by BASF, "WRDA" series by W.R. Grace, or equal.
2. High Range Water-Reducing Admixtures: ASTM C494 Type F, "MasterRheoBuild 1000" (formerly “RheoBuild 1000”) or “MasterGlenium” (formerly “Glenium”) series by BASF or equal.
3. Water Reducing Admixture and Retarder: ASTM C494 Type B or D, "MasterPozzolith" (formerly “Pozzolith”) series or “MasterSet DELVO” (formerly “DELVO”) series by BASF, "Plastiflow-R" by Nox-crete, or equal.
4. Air Entraining Admixtures: ASTM C260, product suit condition by BASF or equal.
5. Viscocity Modifiers: ASTM C494 Type S.
F. Slurry: Same proportion of cement to fine aggregates used in the regular concrete mix (i.e. only coarse aggregate omitted); well mixed with water to produce a thick consistency.
G. High Strength Grout: See section 05 1200 or 05 1100 for requirements.
H. Dry Pack: Dry pack (used only for cosmetic concrete repairs) shall consist of:
1. One part cement to 2-1/2 parts fine aggregate (screen out all materials retained on No.4 sieve), mixed with a minimum amount of water, added in small amounts.
7.j.2
Packet Pg. 435 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 6 Cast-in-Place Concrete
2. Mix to consistency such that a ball of the mixture compressed in the hand will retain its shape, showing finger marks, but without showing any surface water.
2.4 ACCESSORIES
A. Bonding Agent: ASTM C881, Type II Grade 2 Class B or C. Do not allow epoxy to set before placing fresh concrete.
1. “MasterEmaco ADH 326” (formerly “Concresive Liquid LPL”) by BASF;
2. “Rezi-Weld 1000” by W.R. Meadows.
B. Chemical Hardener: Fluorosilicate solution designed for densification of cured concrete slabs. “MasterKure HD 300 WB” (formerly “Lapidolith”) by BASF, "LIQUI-HARD" W.R. Meadows Co, or equal.
C. Moisture-Retaining Cover: ASTM C171, type 1, one of the following;
1. Regular Curing Paper, Type I, reinforced waterproof: Fortifiber Corporation "Orange Label Sisalkraft", "Pabcotite" paper, or equal.
2. Polyethylene Film: ASTM D 2103, 4 mil thick, clear or white color.
3. White-burlap-polyethylene sheet, weighing not less than 10 oz/per linear yd.
D. Liquid Curing Compound: ASTM C 309, Type 1, Class B, clear or translucent, 25% minimum solids, water base acrylic cure/sealer which will not discolor concrete and compatible with bonding of finishes specified in related sections.
W.R. Meadows Co. “Vocomp 25” or equal. Maximum VOC content shall comply with local requirements and California Green Building Code.
E. Under Slab Water Vapor Retarder: Vapor retarder sheet to be ASTM E1745 Class A; 15 mil, single ply extruded polyolefin; permeance no greater than 0.01 U.S. Perms per ASTM E154, ASTM E96 procedure B or ASTM F1249.
1. “Stego Wrap Vapor Barrier (15mil)” by Stego Industries LLC.
2. “Vaporguard” by Reef Industries.
3. Approved Equal.
F. Evaporation Reducer: "MasterKure ER 50” (formerly Confilm), by BASF.
G. Permeability Reducer: Use only where specifically referred to.
1. Admixture Type: Xypex Chemical Corporation "XYPEX Admix C-500".
Dosage: 2-3% of cement content by weight; 15 lb/cu. yd. max. or BASF “MasterLife 300D” (formerly “Rheomac 300D”). Dosage: 2% of cement by mass.
2. Surface-Applied Type: Xypex Chemical Corporation "XYPEX Concentrate. Brush application: 1.25-1.50lb/sq. yd., 5 parts powder to 2 parts water. BASF “MasterSeal 500” (formerly Tegraproof”). Slurry coat:
one part water to 2.25-2.5 parts powder by volume.
3. Approved equal.
2.5 JOINT DEVICES AND MATERIALS
A. Waterstops: Resilient type, meeting Corps of Engineers CRD-C 572. Consult manufacturer for appropriate product for specific use. Submit for review. Install
7.j.2
Packet Pg. 436 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 7 Cast-in-Place Concrete
per manufacturers recommendation. Provide W. R. Meadows “Seal Tight” PVC waterstop, Sika “Greenstreak” PVC waterstop, or approved equal.
B. Expansion Joint Filler: ASTM D1751, Nonextruding, resilient asphalt impregnated fiberboard or felt, 3/8 inch thick and 4 inches deep; tongue and groove profile.
1. Products: "Servicised Products", W.R. Meadows, Inc., "National Expansion Joint Company", "Celotex Corporation", or equal.
C. Joint Filler: ASTM D944, Compressible asphalt mastic with felt facers, 1/4 inch thick and 4 inches deep.
D. Sealant and Primer: As specified in Section 07 9105.
E. Slab Joint Sealant: Compatible with floor finishes specified in related sections.
2.6 CONCRETE MIXES
A. General requirements for mix design and submittal of structural class concrete:
1. Provide Contractor submittals to Architect/Engineer not less than 15 days before placing concrete.
2. Contractor shall review mix designs and proposed placing requirements prior to submittal for compatibility to ensure that the concrete as designed can be placed in accordance with the drawings and specifications.
3. Changes or revisions require re-submittal: All variations to approved mix designs, including changing type and/or quantity of admixtures shall be resubmitted to the Architect/Engineer for review prior to use.
4. Mix design(s) for all structural classes of concrete to be prepared by qualified person experienced in mix design. Allow for time necessary to do trial batch testing when required.
5. Preparer to provide backup data and certify in writing that mix design meets:
a. Requirements of the specifications for concrete durability and quality.
b. Requirements of the California Building Code and ACI 318 Section 26.4, including break histories, trial batching test results, and/or a mix designed by a California Registered Civil Engineer per ACI 318 Section 26.4.3.1(b) and bearing the Engineer’s seal & signature.
6. Clearly note on mix designs with specified maximum WCR if design permits addition of water on site, or clearly identify in the mix design that no water is to be added on site.
7. Deviations: Clearly indicate proposed deviations, and provide written explanation explaining how the deviating mix design(s) will provide equivalent or better concrete product(s) than those specified.
8. Include adjustments to reviewed mix designs to account for weather conditions and similar factors.
B. Proportioning - General: The following provisions apply to all mix designs:
1. Proportion concrete mixes to produce concrete of required average strength (as defined by ACI 318 Section 19.2.1). Select slump, aggregate sizes, shrinkage, and consistency that will allow thorough compaction without excessive puddling, spading, or vibration, and without permitting the materials to segregate, or allow free water to collect on the surface.
7.j.2
Packet Pg. 437 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 8 Cast-in-Place Concrete
2. Select aggregate size and type to produce dense, uniform concrete with low to moderate shrinkage, free from rock pockets, honeycomb and other irregularities.
3. Mix designs may include water reducing and retarding admixtures to meet or exceed minimum set times (time required to place and finish) and to minimize Water Cement Ratios (WCR). Minimum and maximum criteria presented in this section are guidelines and do not represent a specific mix design.
4. Cement Content: Minimum cement content indicates minimum sacks of cementitious material. Increasing cement content to increase early strengths or to achieve specified WCR while maintaining water content is discouraged in order to minimize effects of shrinkage.
a. Substitution of fly ash for Portland cement on an equivalent weight basis up to 25% replacement is permitted, except at high early strength concrete. Replacement in excess of 25% is not permitted unless part of a specified mix design that has been submitted for review.
b. Such substitution requests may be denied by the Engineer.
5. Water Content: Mix designs with a specified maximum Water Cement Ratio (WCR) may be designed with a lower WCR than specified in order to allow addition of water at the site.
6. Concrete Strength: Establish required average strength for each type of concrete on the basis of field experience or trial mixtures, as specified in ACI 301 and this section.
a. For trial mixtures method, employ independent testing agency acceptable to Architect/Engineer for preparing and reporting proposed mix designs.
7. Placement Options: Mix designs may, at the Contractor's option, be designed for either pump or conventional placement with aggregate size, slumps, etc. to be maintained as specified in this section.
C. Proportioning Normal Weight Concrete: Comply with ACI 211.1 recommendations and this section.
D. Proportioning Structural Lightweight Concrete: Comply with ACI 211.2 recommendations and this section. Maximum cured weight of lightweight concrete shall be 110 pounds per cubic feet.
E. Special mix design requirements for interior concrete floor slabs on grade:
1. Proportion concrete mixes per this specification, ACI 211.1, and the requirements below:
2. Fly Ash Type F, shall be substituted for cement on a 1 lb. per 1 lb. basis, with a minimum replacement of 25% and a maximum of 35%.
3. 200 lbs. of 3/8(-) aggregate shall be added to reduce total sand.
4. Reduce total sand to minimum practical.
5. Admixture dosage shall be per manufacturer’s recommendations. Dosage may be increased for workability as long as set times are not excessive for placement and finishing.
7.j.2
Packet Pg. 438 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 9 Cast-in-Place Concrete
F. Mix Design Minimum Requirements:
Concrete Class Coarse
Aggregate Size
(Inches) & Fine
Aggregate3
Maximum WCR
or Maximum
Nominal Slump &
Tolerance
(Inches)1,2
Minimum
28-Day
Design
Strength
Minimum
Cement
Sacks/per
yd4
NON-STRUCTURAL
1) Lean Concrete (use
only where specified)
--- --- --- 3.0
STRUCTURAL
1) Interior Slab on
Grade5
1” x #4 WCR = .45 3,000 6.1
2) Foundation (including
stem walls)
1" x #4 WCR = .53 3,000 5.0
1. The tolerance is the maximum deviation allowable without rejection. The mix design shall be based on the nominal value specified and is without water reducing mixtures. Slump to be measured at the end of the hose.
2. The maximum water cement ratio (WCR) is limited at time of placement as noted. No water is to be added on site such that the specified WCR or maximum slump is exceeded without approval of the testing laboratory and the Architect/Engineer. Workability is to be achieved utilizing an acceptable mid-range to high range water reducing admixture.
3. Gradation of aggregate is per ACI 318 section 26.4.1.2 and ASTM C33.
4. Minimum cement content includes all cementitious materials.
5. See Article 2.6E for additional requirements at interior slabs on grade.
2.7 MIXING CONCRETE
A. Batch final proportions in accordance with approved mix designs. All adjustments to approved proportions, for whatever reason, shall be reviewed by the Architect/Engineer prior to use.
B. Batch and mix concrete in accordance with ASTM C94, at an established plant.
Site mixed concrete will be rejected.
C. Provide batch and transit equipment adequate for the work. Operate as necessary to provide concrete complying with specified requirements.
D. Place mixed concrete in forms within 1-1/2 hours from the time of introduction of cement and water into mixer or 300 revolutions of the drum whichever comes first. Use of, re-mixing, and/or tempering mixed concrete older than 1 hour will not be permitted.
E. Do not add water at the site to concrete mixes with a maximum specified WCR unless the water content at batch time provides for a WCR less than specified and this provision, including the quantity of water which may be added at the site, is specifically noted on the mix design and certification by the mix preparer. See ASTM C94 for additional requirements.
2.8 SOURCE QUALITY CONTROL
A. Services by independent Testing Agency:
7.j.2
Packet Pg. 439 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 10 Cast-in-Place Concrete
1. Batch Plant Certificates: Obtain the weighmaster's Batch Plant Certificate at arrival of truck at the site. If no batch plant certificate is provided, recommend to the General Contractor that the truckload of concrete be rejected. So note in daily log, along with the location of the load of concrete in the structure if the load is not rejected.
a. Laboratory's inspector shall obtain for each transit mixer Batch Plant Certificates to verify mix design quantities and condition upon delivery to the site.
b. Certificates to include: Date, time, ingredient quantities, water added at plant and on job, total mixer revolutions at time of placement, and time of departure.
c. Concrete with specified water cement ratio: Add no water on site unless mix design and batch records each show additional water may be added. See ASTM C94 for additional requirements.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify lines, levels, and dimensions before proceeding with work of this section.
B. Verify work of other sections is complete and tested as required before proceeding.
3.2 PREPARATION
A. Observation, Inspection and Testing:
1. Architect/Engineer: Notify not less than 2 working days before each concrete placement, for observation and review of reinforcing, forms, and other work prior to placement of concrete.
2. Testing Agency: Notify not less than 24 hours before each placement for inspection and testing.
B. Placement Records: Contractor shall maintain records of time, temperature and date of concrete placement including mix design and location in the structure.
Retain records until completion of the contract. Make available for review by Testing Agency and Architect/Engineer.
C. Coordinate placement of joint devices with erection of concrete formwork and placement of form accessories.
D. Verify location, position and inclusion of all embedded and concealed items.
E. Verify installation of vapor retarder under interior slabs on grade, as specified in related section, is complete.
F. Cleaning and Preparation:
1. Remove loose dirt, mud, standing water, and foreign matter from excavations and cavities.
2. Close cleanout and inspection ports securely.
3. Thoroughly clean reinforcement and other embedded items free from loose rust and foreign matter. Maintain reinforcing securely in place. Do not place concrete on hot reinforcing.
7.j.2
Packet Pg. 440 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 11 Cast-in-Place Concrete
4. Dampen form materials and substrates on which concrete is to be placed at least 1 hour in advance of placing concrete; repeat wetting as necessary to keep surfaces damp. Do not saturate. Do not place concrete on saturated material.
a. Thoroughly wet wood forms (except coated plywood), bottom and sides of trenches, adjacent concrete or masonry and
reinforcement.
b. Concrete slabs on base rock, dampen rock.
c. Concrete slabs on vapor retarder, do not wet vapor retarder.
5. Verify that metal forms are clean and free of rust before applying release agent.
6. Prepare previously placed concrete by cleaning with steel brush and applying bonding agent in accordance with manufacturer's instructions.
G. Drill holes in existing concrete at locations where new concrete is doweled to existing work. Insert steel dowels and prepare connections as detailed.
H. Do not overcut at existing concrete work to remain. Contractor is responsible for repair/replacement of overcut concrete to the Owner’s satisfaction.
3.3 PIPES AND CONDUITS IN CONCRETE
A. Slabs-on-Grade:
1. No pipe or conduit exceeding 1 inch outside diameter shall be embedded within the specified slab thickness except as specifically detailed.
2. Do not stack or abut pipes, maintain 3 inches minimum clearance.
B. Sleeving and Wrapping:
1. Foundations: Sleeve or wrap all individual pipe penetrations, minimum 1- 1/2 inches clear to reinforcing all around.
a. Sleeves: PVC. Provide 1 inch minimum clear all around O.D. pipe to I.D sleeve, UNO at ends, fill void space with mastic or plastic bituminous cement.
b. Wrapped Vertical Pipes: Provide 1/8 inch nominal sheet foam with three wraps minimum, UNO.
c. Wrapped Horizontal Pipes: Provide 1/8 inch nominal sheet foam with eight wraps minimum, UNO.
d. Underground Fire Lines 4” and Larger: At sleeves provide 2 inch minimum clear all around O.D. pipe to I.D sleeve. At wrapped pipes, provide 1/8 inch nominal sheet foam with sixteen wraps minimum.
2. Slabs or Curbs: Wrap pipes as described above.
C. Space groups of pipes/conduits at least 3 sleeve diameters apart, do not interrupt specified concrete and reinforcement.
1. Provide block-outs as detailed when grouping of pipes/conduits in foundation or other structural member prevents spacing as described.
Notify Architect/Engineer for review of any conditions not conforming to details.
2. Center pipe/conduit penetrations in the depth and/or thickness of foundations.
3. Maximum size of pipe/conduit penetrations shall not exceed the least dimension of concrete divided by 3.
D. Do not embed pipes/conduits in concrete slabs on metal deck.
7.j.2
Packet Pg. 441 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 12 Cast-in-Place Concrete
E. Provide the following at pipes/conduits detailed to be embedded in a concrete beam, wall or column:
1. Place as near as possible to center of member with reinforcing as specified on each side.
2. Where reinforcing is located near or at center of member, place pipe or conduit 1 inch minimum clear from reinforcing and provide #3 at 12 inches on center perpendicular to the pipe/conduit. Reinforcing to extend 12 inches minimum past pipe/conduit each side.
3. Maintain ¾ inch clear minimum from added reinforcing to face of concrete where not exposed to weather and 1-1/2 inches clear where exposed to weather.
4. Space embedded items (groups of pipe/conduit, junction boxes or other elements) minimum 3 inches apart.
5. Provide reinforcing in walls, beams, columns as detailed for groups of pipe/conduit. Provide minimum replacement reinforcement of same size and number for interrupted or displaced reinforcement for the full height, length, width of the wall, beam, and/or column on each side of the “effective opening.”
3.4 CONCRETE PLACEMENT
A. Transporting:
1. Provide clean, well-maintained equipment of sufficient quantity and capacity to execute the work and produce concrete of quality specified.
2. Handle and transport concrete from mixer to final deposit location as rapidly as practicable. Prevent separation or loss of ingredients.
B. Perform concrete placement by methods which will not puncture, damage or disturb vapor retarder membrane. Repair all damage to vapor retarder membrane before covering.
C. Placement - General: Placement, once started, shall be carried on as a continuous operation until section of approved size and shape is completed.
Provide construction joints as detailed on the drawings. Engineer's written approval required for all deviations.
1. Deposition:
a. Deposit concrete to maintain an approximately horizontal plastic surface until the completion of the unit placement.
b. Deposit as neatly as practicable in final position, minimize rehandling or flow. c. Do not drop concrete freely where reinforcing bars, embeds, or obstructions occur that may cause segregation. Provide spouts, elephant trunks, or other means to prevent segregation during placement.
2. Depth: Layered placement in columns and walls shall not exceed ten feet vertical depth.
a. Place concrete in minimum 32 inch horizontal lifts.
b. Schedule placement to ensure that concrete will not take initial set before placement of next lift.
c. No horizontal cold joints are allowed in columns or walls.
3. Progress Cleaning: Remove all concrete spilled on forms or reinforcing steel in portions of structure not immediately concreted. Remove completely before concrete sets.
7.j.2
Packet Pg. 442 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 13 Cast-in-Place Concrete
4. Interruptions: Shut down placement operations and dispose of all remaining mixed concrete and concrete in hoppers or mixers following all interruption in placement longer than 60 minutes.
a. If such interruption occurs, provide new or relocate existing construction joints as directed by Engineer.
b. Cut concrete back to the designated line, cleaning forms and reinforcing as herein specified.
c. Prepare for resumption of placement as for new unit when reason for interruption is resolved.
D. Consolidation:
1. Consolidate all concrete thoroughly during placement with high-speed mechanical vibrators and other suitable tools. Perform manual spading and tamping to work around reinforcement, embedded fixtures, and into corners of formwork as required to obtain thorough compaction. a. Provide vibrators with sufficient amplitude for adequate consolidation.
b. Use mechanical vibrators at each point of concrete placement. c. Keep additional spare vibrators, in addition to those required for use, at the site for standby service in case of equipment failure.
2. Consolidate each layer of concrete as placed.
a. Insert vibrators vertically at points 18 to 30 inches apart; work into top area of previously placed layer to reconsolidate, slowly withdraw vibrator to surface.
b. Avoid contact of vibrator heads with formwork surfaces. c. Systematically double back and reconsolidate wherever possible.
Consolidate as required to provide concrete of maximum density with minimized honeycomb.
E. Unacceptable Materials:
1. Do not place concrete that has started to set or stiffen. Dispose of these materials.
2. Do not add water on site to concrete except as specified in the approved mix design, see PART 2 above.
F. Protection of installed work:
1. Do not introduce any foreign material into any specified drainage, piping or duct systems.
2. Contractor shall bear all costs of work required to repair or clean affected work as a result of failure to comply with this requirement.
3.5 CONCRETE JOINTS
A. Structural Joints (Construction/Cold Joints):
1. Locate joints only where shown, or as approved.
2. Review Required: Joints not indicated on the plans shall be located to meet the minimum requirements below, shall not impair the strength of the structure and shall be submitted to Architect/Engineer for review prior to placement of concrete.
a. Indicate proposed location(s) of construction/cold/expansion joints on shop drawing submittals for review prior to placing concrete.
7.j.2
Packet Pg. 443 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 14 Cast-in-Place Concrete
3. Clean and roughen all surfaces of previously placed concrete at construction joints by washing and sandblasting to expose aggregate to 1/4 inch amplitude.
4. Slabs-On-Grade: Maximum Length of continuous placement shall not exceed 60 feet without special review by the Architect/Engineer.
Alternate or stagger placement sections.
5. Foundations: Maximum Length of continuous placement shall not exceed 200 foot increments. Provide “keyed” shut-off locations made up with form boards. Extend reinforcing one lap length or more through shut-off. a. All reinforcement shall be continuous through construction/cold joint, lapping to adjacent reinforcing in future placement.
6. Horizontal Construction Joints: Place 2 inch slurry (specified concrete mix less coarse aggregate) at beginning of pour at the bottom of walls unless a prior review of a mock-up section demonstrates that segregation of aggregate will not occur.
B. Expansion/Construction Joints (Dowel Joints and Control Joints):
1. Interior and Exterior Floor Slabs-on-Grade:
a. Expansion/Construction Joints: Provide dowel joints or control joints at a maximum dimension (in feet) of three times the slab thickness (in inches) in each direction unless noted otherwise (15’- 0” maximum). Install joints to match slab level and in straight lines. Locate joints at all reentrant corners including blockouts. b. Proportions: Install joints to divide slab into rectangular areas with long dimensions less than 1.5 times short dimension.
2. Exterior Concrete Paving (walkways, patios) and other non-structural concrete flatwork at grade:
a. Expansion/ construction joints: Provide a 2 inch deep troweled groove or asphalt impregnated joint material embedded 50 percent of the slab depth at 12 feet on center, maximum. b. Proportions: Place no section with a length larger than two times width. Additionally, place joints at all inside corners and at all intersections with other work.
C. Joint Types:
1. Dowel Joint: A keyed joint with smooth dowels passing through to allow unrestricted movement due to contraction and expansion. Joints are as specified on the drawings.
2. Control Joint(s): Shrinkage crack control joints may be of the following types when shown on the drawings. Install joints in a straight line between end points with edges finished appropriate to type. Depth shall be 25% of the slab thickness, unless noted otherwise. Fill joints with sealant as shown on the drawings or as required by related sections. a. 1/4 inch wide troweled joint.
b. Keyed joint: Only at locations where concealed by other finishes. c. Masonite Strip, 1/8 inch: Only at locations where concealed by other finishes.
d. Saw Cut, 1/8 inch: Must be performed within eight hours of completion of finishing. Do not make saw cuts if aggregate separates from cement paste during cutting operation. Prevent marring of surface finish. Fill with flexible sealant.
3.6 VAPOR RETARDER
7.j.2
Packet Pg. 444 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 15 Cast-in-Place Concrete
A. Vapor Retarder Installation: Install as specified in PART 2, ASTM E1643, and per manufacturer’s recommendations including taping and lapping of seams, sealing of penetrations, and repair of damage. Do not extend vapor retarder below footings.
3.7 FLATWORK
A. General Requirements for All Concrete Formed & Finished Flat:
1. Edge Forms and Screeds: Set accurately to produce indicated design elevations and contours in the finished surface, edge forms sufficiently strong to support screed type proposed.
2. Jointing: Located and detailed as indicated.
3. Consolidation: Concrete in slabs shall be thoroughly consolidated.
B. Flatwork Schedule:
1. Exterior Slabs-On-Grade: Place concrete directly over sub-base as indicated.
a. Sub-Base: Clean free-draining, crushed base rock, 6 inch minimum thickness, thoroughly compacted.
2. Interior Concrete Slabs-On-Grade:
a. Sub-Base: Clean free-draining, crushed base rock, 6 inch minimum thickness, thoroughly compacted.
b. Vapor Retarder: Install over sub-base.
3.8 FORMED SURFACES
A. Form all concrete members level and plumb, except as specifically indicated.
Comply with tolerances specified in ACI 318 Section 26.11, ACI 301 Section 2, and this specification, except that maximum permissible deviation is 1/4 inch end-to-end for any single member.
B. Cambers: Provide all cambers indicated in the formwork construction. Set screeds to produce specified cambers in the finished concrete.
3.9 CONCRETE FINISHES
A. Flatwork Finishing:
1. Perform with experienced operators.
2. Finish surfaces monolithically. Establish uniform slopes or level grades as indicated. Maintain full design thickness.
3. In areas with floor drains, maintain design floor elevation at walls; slope surfaces uniformly to drains as indicated on drawings.
4. Flatwork Finish Types:
a. Wood Float Finish: Surfaces to receive quarry tile, ceramic tile, or cementitious terrazzo with full bed setting system, or wood frame for raised finished floors.
b. Steel Trowel Finish: Surfaces to receive carpeting, resilient flooring, seamless flooring, thin set terrazzo, thin set tile or similar finishes specified in related sections. Trowel twice, minimum. c. Broom Texture Finish: Exterior surfaces as indicated or for which no other finish is indicated. Finish as for steel trowel finish, except immediately following first troweling, (depending on conditions of concrete and nature of finish required) provide uniform surfaces texture using a medium or coarse fiber broom.
7.j.2
Packet Pg. 445 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 16 Cast-in-Place Concrete
B. Other Concrete: Provide as required to achieve appearance indicated on structural and architectural drawings and related sections.
1. Repair surface defects, including tie holes, immediately after removing formwork.
2. Unexposed Form Finish: Rub down or chip off fins or other raised areas 1/4 inch or more in height.
3. Exposed Form Finish: Finish concrete to match forms. Rub down or chip off and smooth fins or other raised areas 1/4 inch or more in height.
Provide finish as follows:
a. Smooth Rubbed Finish: Wet concrete and rub with carborundum brick or other abrasive, not more than 24 hours after form removal.
b. Grout Cleaned Finish: Wet areas to be cleaned and apply grout mixture by brush or spray; scrub immediately to remove excess grout. After drying, rub vigorously with clean burlap, and keep moist for 36 hours.
c. Cork Floated Finish: Immediately after form removal, apply grout with trowel or firm rubber float; compress grout with low-speed grinder, and apply final texture with cork float.
4. Intermediate joint and score marks and edges: Tool smooth and flush unless otherwise indicated or as directed by the Architect.
5. Use steel tools of standard patterns and as required to achieve details shown or specified. All exposed corners not specified to be chamfered shall have radiused edges.
3.10 TOLERANCES
A. Minimum Flatwork Tolerances: Measure flatness of slabs with in 48 hours after slab installation in accordance with ACI 302.1R and ASTM E1155 and to achieve the following FF and FL tolerances:
1. Exterior surfaces: 1/8 inch minimum per foot where sloped to drain.
Level otherwise. FF20 and FL15.
2. Interior surfaces not otherwise shown or required: Level throughout.
FF25 and FL20
3. Interior surfaces required to be sloped for drainage: 1/8 inch in 10 ft.
4. Finish concrete to achieve the following tolerances:
a. Under Glazed Tile on Setting Bed: FF30 and FL20.
b. Under Resilient Finishes: FF35 and FL25.
c. Flooring manufactureer and pertainent section of Division 9.
B. Formed Surface Tolerances:
1. Permanently Exposed Joints and Surfaces: Provide maximum differential height within two feet of, and across construction joints of 1/16 inch.
2. Vertical Elevations: Elevation of surfaces shall be as shown or approved.
3.11 CONCRETE CURING
A. Curing - General: Cure in accordance with ACI 308. Maintain concrete water content for proper hydration and minimize temperature variations. Begin curing immediately following finishing.
7.j.2
Packet Pg. 446 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 17 Cast-in-Place Concrete
B. Protection During Curing: Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.
The General Contractor is responsible for the protection of the finished slab from damage.
1. Avoid foot traffic on concrete for minimum of 24-hours after placement.
2. Protect concrete from sun and rain.
3. Maintain concrete temperature at or above 50 degrees F. during the first 7 days after placement. See Article ENVIRONMENTAL
REQUIREMENTS.
4. Do not subject concrete to design loads until concrete is completely cured, and until concrete has attained its full specified 28-day compressive strength or until 21 days after placement, whichever is longer.
5. Protect concrete during and after curing from damage during subsequent building construction operations. See Article PROTECTION.
C. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.
1. Normal concrete: Not less than 7 days.
2. High early strength concrete: Not less than 4 days.
D. Begin curing immediately following finishing.
E. Surfaces Not in Contact with Forms:
1. Start initial curing as soon as free water has disappeared and before surface is dry. Keep continuously moist for not less than 3 days by water ponding, water-saturated sand, water-fog spray, or saturated burlap.
2. Begin final curing after initial curing but before surface is dry. a. Moisture-retaining cover: Seal in place with waterproof tape or adhesive.
b. Curing compound: Apply in two coats at right angles, using application rate recommended by manufacturer.
F. Flatwork on Grade: Cure by one of the following methods:
1. Water Cure (Ponding): Maintain 100 percent coverage of water over floor slab areas, continuously for minimum 7 calendar days.
2. Spraying: Spray water over floor slab areas and maintain wet for 7 days.
3. Moisture-Retaining Film or Paper: Lap strips not less than 6 inches and seal with waterproof tape or adhesive; extend beyond slab or paving perimeters minimum 6 inches and secure at edges; maintain in place for minimum 7 days.
4. Absorptive Moisture-Retaining Covering: Saturate burlap-polyethylene and place burlap-side down over floor slab areas, lapping ends and sides and extend beyond slab or paving perimeters 6 inches minimum; maintain in place for minimum 7 days.
5. Liquid Membrane-forming Curing Compound: Provide only when subsequent concrete treatments or finish flooring specified in related sections will not be affected by cure/sealer. Apply curing compound in accordance with manufacturer's instructions at the maximum recommended application rate in two coats, with second coat applied at right angles to first.
G. Foundations: Apply curing compound immediately after floating.
7.j.2
Packet Pg. 447 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 18 Cast-in-Place Concrete
3.12 CONCRETE HARDENER
A. Apply hardener to all floor slabs not receiving other finishes after 30 days minimum curing. Clean slabs of non-compatible cure/sealers or other foreign material(s) and apply in strict accordance with the manufacturer's directions.
3.13 GROUTING AND DRY PACK
A. Set steel plates on concrete or masonry with high strength grout bed, completely fill all voids; thoroughly compact in place. See Section 05 1200 or 05 1100.
B. Bolts or inserts dry packed or grouted in place shall cure for minimum 7 days before tensioning.
3.14 FIELD QUALITY CONTROL
A. Testing and Inspections by Independent Testing Agency: Provided verification and inspection of concrete per CBC Table 1705.3. Provide written reports for to Engineer, Architect, Contractor and Building Official for the following tests and inspections:
B. Testing & Inspection: Provide periodic inspection of reinforcing steel. Provide continuous inspection during placement of structural class concrete, 3000 psi or more. Non-structural class concrete with a design strength of 2500 psi or less to have periodic inspection on a 150 cubic yard basis as required to assure conformance.
1. Provide periodic inspection of bolts in concrete prior to and during placement where so noted on the construction documents.
2. Structural Concrete Cylinder Tests: Perform in accordance with ASTM C31.
a. Take four standard 6 inch x 12 inch (or five 4 inch x 8 inch) cylinder specimens on the site, of each class of concrete as specified in PART 2, not less than once a day or for each 150 cubic yards or 5000 sq ft or fraction thereof placed each day. b. Record the location of each concrete batch in the building in a log and also note on each specimen.
c. Perform standard compression test of cylinders in accordance with ASTM C39, one at 7 days and two (three for 4x8 cylinders) at 28 days.
d. Hold fourth (fifth) cylinder untested until specified concrete strengths are attained.
3. Structural Concrete Slump Test and Air Tests: Perform in accordance with ASTM D143 and C231 or C173 at the time of taking test cylinders, and/or at one-hour intervals during concrete placing.
4. Measure and record concrete temperature upon arrival of transit mixers and when taking specimens. Note weather conditions and temperature.
5. Propose adjustments to reviewed mix designs for Architect / Engineer review to account for variations in site or weather conditions, or other factors as appropriate.
6. Water Vapor Transmission Tests: Floors receiving floor finishes specified in related sections will be tested prior to installation of flooring systems.
Refer to sections specifying floor finishes for related requirements.
C. Services by Contractor:
7.j.2
Packet Pg. 448 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 19 Cast-in-Place Concrete
1. Rejection of Concrete Materials: Do not use the following without prior written approval of the Architect/Engineer;
a. Materials without batch plant certificates.
b. Materials not conforming to the requirements of these specifications.
3.15 ADJUSTING
A. Inspect all concrete surfaces immediately upon formwork removal. Notify Architect/Engineer of identified minor defects. Repair all minor defects as directed.
B. Surface and Finish Defects: Repair as directed by the Architect/Engineer, at no added expense to the Owner. Repairs include all necessary materials; reinforcement grouts, dry pack, admixtures, epoxy and aggregates to perform required repair.
1. Repair minor defective surface defects by use of drypack and surface grinding. Specific written approval of Architect/Engineer is required.
Submit proposed patching mixture and methods for approval prior to commencing work.
2. Slabs-on-Grade, Elevated Slabs and on Slabs on Metal Deck: Review for "curled" slab edges and shrinkage cracks prior to installation of other floor finishes. Grind curled edges flush, fill cracks of 1/16 inch and greater with cementitious grout.
3. Grind high spots, fins or protrusions caused by formwork; Fill-in pour joints, voids, rock pockets, tie holes and other void not impairing structural strength. Provide surfaces flush with surrounding concrete.
3.16 DEFECTIVE CONCRETE
A. Defective Concrete: Concrete not conforming to required compressive strength, lines, details, dimensions, tolerances, finishes or specified requirements; as determined by the Architect/Engineer.
B. Repair or replacement of defective concrete will be determined by the Architect/Engineer who may order additional testing and inspection at his option.
The cost of additional testing shall be borne by Contractor when defective concrete is identified.
C. Specific Defects:
1. "Low-Strength"; Concrete Not Meeting Specified Compressive Strength after 28 days:
a. Concrete with less than 25% Fly Ash as cementitious material:
Test remaining cylinder(s) at 56 days. If strength requirements are met, concrete strength is acceptable.
b. Concrete with 25% or more Fly Ash as cementitious material: Test remaining cylinder(s) at 70 days. If strength requirements are met, concrete strength is acceptable.
2. Excessive Shrinkage, Cracking, Crazing or Curling; Defective Finish:
Remove and replace if repair to acceptable condition is not feasible.
3. Lines, Details, Dimensions, Tolerances: Remove and replace if repair to acceptable condition is not feasible.
7.j.2
Packet Pg. 449 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
03 30 00 - 20 Cast-in-Place Concrete
4. Slab sections not meeting specified tolerances for trueness/flatness or lines/levels: Remove and replace unless otherwise directed by the Architect/Engineer. Minimum area for removal: Fifteen square feet area unless directed otherwise by the Architect/Engineer.
5. Defective work affecting the strength of the structure or the appearance:
Complete removal and replacement of defective concrete, as directed by the Architect/Engineer.
3.17 CLEANING
A. Maintain site free of debris and rubbish. Remove all materials and apparatus from the premises and streets at completion of work. Remove all drippings; leave the entire work clean and free of debris.
B. Slabs to Receive Floor Finishes Specified in other sections: Remove noncompatible cure/sealers or other foreign material(s) which may affect bonding of subsequent finishes. Leave in condition to receive work of related sections.
3.18 PROTECTION
A. Protect completed work from damage until project is complete and accepted by Owner.
B. Construction Loads: Submit engineering analysis for equipment loads (including all carried loads) specified in article submittals.
C. Keep finished areas free from all equipment traffic for a minimum of 4 additional days following attainment of design strength and completion of curing.
D. Protection of Drainage Systems:
1. Care shall be taken not to introduce any foreign material into any specified drainage, piping or duct system.
2. Cost of work to repair or clean drainage system as a result of failure to comply with this requirement will be back charged to the contractor.
E. Cover traffic areas with plywood sheets or other protective devices; maintain protection in place and in good repair for as long as necessary to protect against damage by subsequent construction operations.
END OF SECTION
7.j.2
Packet Pg. 450 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
09 66 20 - 1 Resinous Terrazzo Flooring
SECTION 09 66 20
RESINOUS TERRAZZO FLOORING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Provide epoxy resin thin set terrazzo floor and base, with divider strips, and accessories and including preparation of concrete substrate, curing, grinding, and sealing, as required for complete finished installation.
1.2 REFERENCES
A. Terrazzo Technical Data, National Terrazzo and Mosaic Association, Inc. (NTMA).
1.3 SUBMITTALS
A. Product Data: Furnish manufacturer's literature for epoxy resin and manufactured accessories.
B. Shop Drawings: Indicate divider strip layouts, control joint strips, base and border strips, and details of abutting items.
C. Samples: Furnish sample panels of each type of terrazzo including divider strip.
D. Maintenance Instructions: Provide written instructions for recommended periodic maintenance.
1.4 QUALITY ASSURANCE
A. Sustainability Requirements: Comply with CALGreen requirements including those relative to finish material pollution control for coatings.
B. Installer Qualifications: Contractor member of National Terrazzo and Mosaic Association (NTMA) or certified to perform work in accordance with NTMA standards.
C. Mock-Up: Provide not less than 100 sf mock-up of resinous terrazzo flooring and adjacent base at location as approved by Architect. Approved mock-up may be incorporated into Project.
1.5 SITE CONDITIONS
A. Provide heat and ventilation in areas where terrazzo work is being performed.
B. Take precautionary measures necessary to ensure excessive temperature changes do not occur.
7.j.2
Packet Pg. 451 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
09 66 20 - 2 Resinous Terrazzo Flooring
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Associated Terrazzo Co., Inc. (San Francisco).
B. San Francisco Terrazzo.
C. Member of Western States Terrazzo Association with minimum five years successful experience fabricating specified flooring.
D. Substitutions: Refer to Section 01 25 00.
2.2 MATERIALS
A. System Description: Provide epoxy resin thin set terrazzo floor and base, with divider strips, and accessories.
1. Basis of Design: All American Tile and Terrazzo Co., Inc.
2. System Colors and Patterns: As indicated, as directed by Architect where not otherwise indicated.
B. Regulatory Requirements, Flammability: Provide materials tested under ASTM E648, Flooring Radiant Panel Test, with results of 0.45 watts/sq cm or higher.
C. Regulatory Requirements, Slip-Resistance: Hard surface finishes to comply with requirements of authorities having jurisdiction for slip-resistant hard surfaces, including general code requirements and for access for persons with disabilities.
D. Epoxy Resin: Comply with NTMA requirements for epoxy resin; provide epoxy resin specially formulated for use in terrazzo floor and base installations.
1. Epoxy Resin Manufacturers:
a. Terroxy Resin Systems/Terroxy Resinous Flooring.
b. Master Terrazzo Technologies/Morricite.
c. Sherwin-Williams Company/Epoxy Terrazzo Thin Set.
d. Key Resin Company/Key Epoxy Terrazzo.
e. Substitutions: Refer to Section 01 25 00.
E. Chips: NTMA Standards for absorption rate, uniformity, soundness, and abrasion resistance; chips shall contain no deleterious or foreign matter.
1. Colors: As required to match Architect's samples.
F. Divider Strips: 1/8" thick white zinc alloy unless otherwise indicated, with angle or "T" anchoring features as required to meet NTMA requirements for terrazzo system.
7.j.2
Packet Pg. 452 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
09 66 20 - 3 Resinous Terrazzo Flooring
G. Accessories: Items as needed to provide a complete terrazzo floor system meeting NTMA requirements; exposed items to match divider strips.
1. Elastomeric Membrane: Provide elastomeric membrane with embedded fiberglass fabric reinforcement as recommended by terrazzo manufacturer for underlayment between epoxy mortar bed and terrazzo flooring.
2. Primer: As recommended by epoxy resin supplier.
3. Control Joint Strips: 1/8" thick white matching divider strips, with 1/4" thick resilient filler suitable for floor surface.
a. Filler Color: As selected by Architect where not otherwise indicated.
4. Slip-Resistant Aggregate: Aluminum oxide granules or similar non-slip material of type to match approved samples.
H. Curing Compound: ASTM C309, Type 1.
I. Cleaning, Sealing and Finishing Compounds: As recommended by NTMA and manufacturer for terrazzo use.
1. Ph Factor: Between 7 and 10; types not affecting color or physical properties of terrazzo.
J. Vapor Retarding Floor Sealer for Concrete Substrates: Type as recommended by NTMA or resin manufacturer where moisture content of concrete exceeds acceptable limits.
2.3 PROPORTIONING
A. Mix and proportion materials for terrazzo in accordance with NTMA recommendations and to match Architect's samples.
1. Impact Strength: No sign of chipping or detachment, no indentation, when tested with 2 lb. falling ball on 1/4" thick epoxy floor bonded to concrete and ground to a terrazzo finish.
2. Bond Strength: 300 psi tensile strength with 100% concrete failure, ACI Committee No. 403 Bulletin Title NO.59-43 (Pages 1139 to 1141).
3. Flammability: Self extinguishing with maximum 0.25" extent of burning, ASTM D635.
4. Thermal Coefficient of Linear Expansion: Maximum 25 x 10-6 inches per inch per degree F with temperature range of minus 12-degree F to 140-degree F, ASTM D696.
B. Proportions and Mixing: In accordance with resin supplier's recommendations for finishes to match Architect's samples.
7.j.2
Packet Pg. 453 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
09 66 20 - 4 Resinous Terrazzo Flooring
PART 3 - EXECUTION
3.1 EXAMINATION
A. Prior to installing flooring, ensure surfaces are level, with maximum surface variation of 1/4" in 10'-0".
B. Ensure surfaces are clean and well cured.
C. Do not commence work until surface conditions are within tolerances required for proper installation.
D. Start of work indicates acceptance of conditions.
3.2 PREPARATION
A. Clean concrete slab free from foreign matter.
B. Apply epoxy-based patching material as required to provide slopes to adjacent finished floor surfaces with minimal vertical rise.
C. Apply vapor retarding floor sealer in accordance with manufacturer recommendations and installation instructions.
3.3 INSTALLATION
A. Install epoxy mortar bed in accordance with terrazzo flooring manufacturer instructions and slope as indicated.
B. Install elastomeric membrane over epoxy mortar bed in accordance with terrazzo flooring manufacturer instructions.
C. Comply with NTMA recommendations for proportioning mixes, reinforcing, installation of strips, and for placing terrazzo.
1. Comply with epoxy resin manufacturer recommendations and installation instructions for preparing substrate and application of epoxy terrazzo mix.
D. Install stop and divider strips in accordance with patterns indicated on Drawings; take care to provide true lines and patterns as indicated.
E. Install control joint strips as indicated.
F. Prepare and prime concrete subfloor according to resin supplier's instructions.
G. Place terrazzo mixture and trowel to level surface, uniform 1/4" thick.
H. Seed trawled surface with additional chips in same proportions as contained in terrazzo mix and trowel.
7.j.2
Packet Pg. 454 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
04 21 00 - 1 Non-Load Bearing Brick Masonry
SECTION 04 21 00
NON-LOAD BEARING BRICK MASONRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Provide non-load bearing single wythe full brick masonry with anchorage to back-up, including mortar, anchorage, and accessories as required for complete installation.
B. Related Sections:
1. Section 05 50 00: Metal fabrications built in brick masonry.
2. Section 07 19 00: Water repellent
3. Section 07 28 00: Weather barrier underlayment.
1.2 ADMINISTRATIVE REQUIREMENTS
A. Design/Build: Provide special engineering to ensure compliance with applicable codes and Contract Documents including requirements for seismic loads.
B. Pre-Installation Meeting: Convene not less than one week prior to commencing work of this Section. Require attendance of those directly affecting work of this Section.
1. Review installation procedures and coordination required with related work.
1.3 SUBMITTALS
A. Product Data: Furnish manufacturer's literature for brick, mortar, materials, and anchorage.
1. Certification: Submit manufacturer's certificate brick masonry units conform to specified standards.
B. Samples: Submit samples to indicate color range of brick and mortar color.
C. Design/Build Certificates: Submit certification signed by California licensed structural engineer indicating attachment system complies with Contract Documents and code requirements including requirements for seismic loads.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: Firm with minimum five years successful experience installing brick masonry walls for projects of similar scope.
B. Mock-Up: Provide minimum 100 square feet brick masonry for Architect approval; approved mock-up may be incorporated into Project.
7.j.2
Packet Pg. 455 Attachment: Fire Station 16 Plans and Specs (Fire Station 16 Plans and Specs) SHAH KAWASAKI ARCHITECTS SAN CARLOS FIRE STATION 16
04 21 00 - 2 Non-Load Bearing Brick Masonry
1.5 DELIVERY, STORAGE, AND HANDLING
A. Protect materials against wetting and soiling.
B. Protect mortar from moisture and temperature extremes.
1.6 PROJECT CONDITIONS
A. Take precautionary measures necessary to ensure that excessive temperature changes do not occur; provide artificial shade, wind breaks, and use cooled materials where necessary.
B. During freezing or near freezing weather, maintain minimum temperature of 50 degrees F to protect masonry work completed or in progress.
C. Keep expansion joint voids clear of mortar.
PART 2 - PRODUCTS
2.1 MATERIALS
A. System Description: Provide non-load bearing single wythe full brick masonry with anchorage to structural back-up, including mortar, anchorage, and accessories.
B. Regulatory Requirements - Loads: Perform brick masonry work in accordance with requirements of California Building Code including requirements for anchored veneer, except where more restrictive requirements are specified.
1. Seismic Requirements: Design brick masonry wall system to comply with seismic loadings as required by California Building Code.
C. Regulatory Requirements - Fire Rated Materials: Provide materials and systems which have passed ASTM E119 tests and are approved for fire ratings indicated on Drawings.
D. Brick Masonry (BR-1): Non-load bearing, burned clay or shale, ASTM C216, Grade MW, Type FBX.
1. Manufacturers:
a. H.C. Muddox Co., Sacramento, CA; 916-325-3620.
b. Endicott Clay Products Co., Fairbury, NE; 402-729-3315. c. Interpace Industries, Inc., Spokane, WA; 800-368-8818. d. Substitutions: Refer to Section 01 25 00.
2. Size: 2-1/4" x 3-5/8" x 7-5/8", standard modular, unless otherwise indicated.
3. Color: Match H.C. Muddox/Tumbleweed.
E. Mortar: Conform to ASTM C270, Type S.
1. Masonry Cement/Premix Mortar: Acceptable only if manufacturer certifies product is made of cement and lime, with no limestone or pulverized material in lieu of cement or hydrated lime.