Cities Index.
Agenda packet

San Carlos City Council
February 27, 2023

Document
Agenda packet
Meeting
February 27, 2023
Body
San Carlos City Council
Pages
6
Original file
68.4 MB
Text extracted from the city's file for reading and search. Open the original on cityofsancarlos.primegov.com. That file is the official record.

For each of the various contract items of work designated on the Bid Schedule, the bidder shall set forth a unit or lump sum price which the bidder shall then use to calculate and designate a total cost for each item of work based upon the designated estimate of the quantities of work to be done, all in clearly legible figures in the respective spaces of the Bid Schedule provided for this purpose.

The bidder shall include in the unit or lump sum prices paid for the various contract items of work full compensation for conforming to the requirements of the Contract Documents and for completing all of the work required. No additional compensation shall be granted for any additional items unless categorized and approved as extra work under the terms of the agreement.

The estimate of construction quantities set forth in the Bid Schedule is approximate only, being given only as a basis for the comparison of bids, and the City does not expressly or by implication agree that the actual amount of work will correspond with those estimated quantities.

The City reserves the right to increase the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or expedient by the Engineer. There shall be no claim for damage or loss of anticipated profit for any bid item omitted in its entirety, and payment will only be made on the basis of actual quantities of work performed.

If the City accepts this proposal and the bidder fails to enter into the contract and/or fails to furnish bonds as required by the specifications with sureties satisfactory to the City within ten (10) calendar days after the bidder has received notice from the City that the contract has been awarded, the City may, at its option, determine that the bidder has breached and abandoned the contract, and thereupon, the bid security accompanying this proposal shall be forfeited and become the property of the City.

The Notice to Proceed will not be issued until after the contract has been fully executed. The contractor shall commence the work under the contract within ten (10) days following the date of the Notice to Proceed, or as otherwise specified in the project specifications or negotiated with

8.k
February 27, 2023

Packet Pg. 245

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-5 Project No. C1752-23
the City, and shall diligently prosecute the project to completion within the time specified. The contract completion period is inclusive of the time needed for material delivery.

Bidder shall comply with the requirements of the California Labor Code, including sections 1770 et seq. , and pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the office of the City Engineer, which copies shall be made available to any interested party upon request. The Contractor shall post a copy of such determination at the job site.

As required by Section 6705 of the California Labor Code and in addition thereto, for any excavation of any trench or trenches five feet (5’) or more in depth, the Contractor shall submit to the Engineer for acceptance, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. Structural calculations prepared, stamped and signed by a Registered Engineer licensed to practice in the State of California shall accompany the plan to verify the structural safety and adequacy of the sheeting, shoring and bracing to be used on the project. No such plan shall allow any shoring, sloping or a protection system less effective than that required by the Construction Safety Orders of the State Division of Occupational Safety and Health.

In accordance with the provisions of Section 1860 of the Labor Code, prior to performing work on the Contract, each Contractor to whom a public works contract is awarded shall sign and file with the City the Worker’s Compensation Certification included in the “Agreement and Agreement Forms” section of these specifications.

Bidder’s attention is directed to Section 2 of the General Provisions for additional information and requirements pertaining to the submission of a bid, and which is incorporated here by reference.

Bidder’s attention is directed to Section 2.13, “Required Contractor and Subcontractor Registration,” of the General Provision. All contractors shall register with the Department of Industrial Relations according to Labor Code Section 1725.5.

Any protest of the proposed contract award must be submitted in writing to the City no later than 5:00 p.m. on the fifth business day following the date of the bid opening. Bidder is directed to the “Bid Protest Procedure” Section of the General Provisions for additional information.

8.k
February 27, 2023

Packet Pg. 246

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-6 Project No. C1752-23

BID SCHEDULE
Bids are to be submitted for the entire work. All applicable sales taxes, state and/or federal, and any other special taxes, patent rights or royalties are included in the prices quoted in the bid.

In the case of a discrepancy between the product of the “Estimated Quantity” and the “Unit Price” with the “Item Total”, the product of the “Estimated Quantity” and the “Unit Price” shall prevail and the figure shown as the “Item Total” shall be adjusted accordingly, except as provided in cases involving (a) or (b) below:
(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount entered in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price; (b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the item total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage-wise the unit price or item total in the Engineer’s Estimate.

If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided.

In the case of a discrepancy between the sum of the figures in the item total column (adjusted per the previous paragraphs, if necessary) and the amount set forth as the total base bid amount, the sum of the figures in the item total column shall prevail and the amount shown as the total base bid amount shall be adjusted accordingly.

8.k
February 27, 2023

Packet Pg. 247

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-7 Project No. C1752-23
BASE BID ITEMS ARE AS FOLLOWS:
"2023 Sewer System Root Foaming Project”
PROJECT NO. C1752-23
BASE BID – BASIN 10
Item
No.

Item
Description
Estimated
Quantity Unit
Unit
Price
Item
Total
1 Mobilization & Demobilization 1 LS $ $
2 Traffic Control and Construction
Area Signs
1 LS $ $
4 Apply Root Foaming Product to
6" Sewer Main
35,408 LF $ $
5 Apply Root Foaming Product to
8" Sewer Main
6,622 LF $ $
6 Apply Root Foaming Product to
10" Sewer Main
355 LF $ $
7 Apply Root Foaming Product to
12" Sewer Main
774 LF $ $
Base Bid Cost $
ALTERNATIVE A – BASIN 1
Item
No.

Item
Description
Estimated
Quantity Unit
Unit
Price
Item
Total
1 Mobilization & Demobilization 1 LS $ $
2 Traffic Control and Construction
Area Signs
1 LS $ $
3 Apply Root Foaming Product to
4" Sewer Main
54 LF $ $
4 Apply Root Foaming Product to
6" Sewer Main
34,350 LF $ $
5 Apply Root Foaming Product to
8" Sewer Main
9,384 LF $ $
6 Apply Root Foaming Product to
10" Sewer Main
1,824 LF $ $
7 Apply Root Foaming Product to
12" Sewer Main
736 LF $ $
8 Apply Root Foaming Product to
15" Sewer Main
951 LF $ $
Alternative A Total $
Total Bid Amount (Base + Alternative A): $___________________

8.k
February 27, 2023

Packet Pg. 248

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-8 Project No. C1752-23
Notes:

1. The Contract will be compared and awarded on the basis of the Total Bid Amount.

2. All items on the Base Bid Schedule must be bid. Partial bids will not be accepted.

3. The City reserves the right to reject all bids for any reason whatsoever.

4. Issuance of the “Notice to Proceed” will constitute the beginning of the Contract.

8.k
February 27, 2023

Packet Pg. 249

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-9 Project No. C1752-23

DESIGNATION OF SUBCONTRACTORS
The Contractor shall perform work equaling at least 30 percent of the value of the original total bid with the Contractor’s own employees and equipment, owned or rented, with or without operators.

In accordance with the Subletting and Subcontracting Fair Practices Act, Public Contract Code sections 4100 et seq . (the “Subcontracting Act”), the Bidder hereby certifies and submits, as required by law, the following concerning subcontractors:

1. The portion of the work, which will be done by each such subcontractor; and

2. The name and location of the place of business of each subcontractor who will perform work or labor, fabricate a portion of the work or improvement according to detailed drawings in the project plans, or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (0.5%) of the Contractor’s total bid.

Portion of Work to be
Performed by Subcontractor
Subcontractor Name,
Address and License Number
(License No. Required under AB 44)
Registered
with DIR?
 check if yes

1. 2.

3. 4.

5. 6.

7. (For additional Subcontractors, attach copies of this sheet as necessary) NOTE: T HIS CERTIFICATE MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.  DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION REQUIREMENT In accordance with Labor Code Section 1725.5, all contractors and subcontractors listed on a public works bid proposal must be registered with the DIR.

8.k
February 27, 2023

Packet Pg. 250

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-10 Project No. C1752-23

NON-COLLUSION AFFIDAVIT
Title 23 United States Code Section 112 and
Public Contract Code Section 7106
State of California )
) ss.

County of _______________ )
(name of person signing affidavit), being first duly
sworn, deposes and says under penalty of perjury under the laws of the State of California, that he or she has the right, power, legal capacity, and authority to execute this Affidavit as (sole owner, partner, president, secretary, etc) of
(legal name of Bidder), the Bidder, that the
Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the Bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in any false or sham Bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham Bid, or that anyone shall refrain from Bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid price, or of that of any other Bidder, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in the Bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, Bid depository, or to any member or agent thereof to effectuate a collusive or sham Bid.

IN WITNESS WHEREOF, the undersigned, as bidder, represent and warrant that they have the right, power, legal capacity, and authority to enter into and execute this document on behalf of the Bidder, and have executed this document by setting hereto their names, titles and signature. (Signature of Representative of Bidder)
Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________
My Commission expires __________________, 20_____ (Seal) NOTE: T HIS AFFIDAVIT MUST BE COMPLETED AND RETURNED AS PART OF THE CONTRACTOR’S BID PROPOSAL.

8.k
February 27, 2023

Packet Pg. 251

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-11 Project No. C1752-23
BIDDER’S QUALIFICATIONS
The following statements as to the financial qualifications and experience of the Bidder are submitted as a part of this Bid and the Bidder guarantees the truthfulness and accuracy of the information. Pursuant to Public Contract Code 10165, financial statements and experience questionnaires are not public records and are not open to public inspection.

Financial Data
Reference is hereby made to the following bank or banks as to the financial responsibility of the bidder.

NAME OF BANK ADDRESS
Experience Data
The Bidder has been engaged in the contracting business, under the present business name for ________ years. Experience in work of a nature similar to that covered in this Bid extends over a period of __________ years.

The Bidder as a Contractor has never failed to satisfactorily complete a contract awarded to him, except as follows: (Name all exceptions and reasons therefore):

Bidder’s Personnel
The following is a list of key personnel including an listing of the person’s knowledge, ability or trade along with a brief description of their experience. If Bidder is awarded the Contract, it is understood that the work will be directed and actively supervised by one of these persons.

List of Personnel Knowledge/Skills Experience

8.k
February 27, 2023

Packet Pg. 252

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-12 Project No. C1752-23
BIDDER’S REFERENCE
The Contractor shall submit three (3) municipal references for chemical sewer root control work, which the Owner can verify. Each reference shall be for work actually performed by the Bidder.

All references shall pertain to actual root control work performed by the Bidder (sub-contractor references are not applicable). Reference work shall have been performed with the manner of application specified herein.

1. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

2. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

3. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

8.k
February 27, 2023

Packet Pg. 253

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-13 Project No. C1752-23

SIGNATURE PAGES
The terms and conditions of the final contract when executed shall control and supersede anything herein to the contrary or inconsistent with such contract.

The bidder states that he has inspected the site of the propose work in order to satisfy himself, by personal examination, or by such other means as he prefers, of the location of the proposed work and as to the actual conditions of and at the work site. The bidder hereby offers to furnish all labor, materials, equipment, transportation, and services necessary to complete the work on this project in accordance with the Contract Documents and to complete all requirements of the Contract Documents for the sums quoted in this Bid.

Addenda:
(if any) bidder has received and examined all addenda issued during the bid period and agrees that all addenda shall be made a part of the Contract Documents. The bidder acknowledges receipt and incorporation of all impacts resulting from all addenda issued by inserting the number of each addendum below OR by signing and submitting with the bid proposal the signature page from each addendum.

Addendum Nos. _____, _____, _____, _____, _____, _____, _____, _____ Bidder’s Guarantee:

In accordance with Public Contract Code Section 20170, accompanying this Bid is _______________ (insert the word “Cash”, “Cashier’s Check”, “Certified Check” or “Bidder’s Bond” as the case may be) made payable to the City of San Carlos in the amount of ___________________________________________________($_______________) equal to at least ten percent (10%) of the total amount of this bid. This amount is given as a guarantee that, in case the undersigned defaults in executing a contract and/or furnishing the necessary bonds after contract award, the said guarantee and the money payable thereon shall become and remain the property of the City as liquidated damages.

Company Profile:

The names of all persons interested in the foregoing bid as principals are as follows:
(Note: If bidder or other interested person is a corporation, state the legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if partnership, state true name of firm, also names of all individual partners composing firm; if bidder or other interested person is an individual, state first and last name in full).

Firm Name:

Business Address:

Names and Titles of Company Officers:

1. 2.

3. 4.

8.k
February 27, 2023

Packet Pg. 254

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-14 Project No. C1752-23
Proposal Execution:

IN WITNESS WHEREOF, the undersigned, as bidder, represent and warrant that they have the right, power, legal capacity and authority to enter into and execute this document on behalf of the Bidder, and have executed this document by setting hereto their names, titles, and signatures. The representations made herein, including but not limited to the above contractor’s license, expiration date and name of bidder, are true and correct, shall be complied with and are made under penalty of perjury.

IF SOLE OWNER, sign here:

I sign as sole owner of the business named above.___________________________ Social Security Number:_________________________________________________ Employer Identification Number:___________________________________________ IF PARTNERSHIP, sign here:

The undersigned certify that we are partners in the business named above and that we sign this contract proposal with full authority to do so. (one or more partners sign) ______________________________________________________________________ ______________________________________________________________________ Federal Tax Identification No. (EIN):_________________________________________ State Tax Identification No.:_______________________________________________ IF CORPORATION, execute here:

The undersigned certify that they sign this contract proposal with full and proper authorization to do so.

Corporate name _________________________________________________________ By_____________________________________ (Title) _________________________ By_____________________________________ (Title) _________________________ Incorporated under the laws of the State of ___________________________________ Federal Tax Identification No. (EIN):_________________________________________ State Tax Identification No.:_______________________________________________ Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________
My Commission expires __________________, 20_____ (Seal)

8.k
February 27, 2023

Packet Pg. 255

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-15 Project No. C1752-23
BIDDER’S BOND
To Accompany Contract Proposal
KNOW ALL PERSONS BY THESE PRESENTS:

That we, the undersigned _________________________________________, as principal and __________________________________, as surety, are held and firmly bound unto the City of San Carlos as OWNER in the penal sum of TEN PERCENT (10%) of the total amount of the bid of the principal, for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.

The condition of the above obligation is such that whereas the Principal has submitted to OWNER a certain BID attached hereto and hereby made a part hereof to enter into a contract in writing, for the 2023 Sewer System Root Foaming Project, No. C1752-23.

NOW, THEREFORE
(a) If said BID shall be rejected, or
(b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BIDS including all required bonds for faithful performance and labor and material, as well as all required evidence of insurance) then this obligation shall be void, otherwise the same shall remain in force and effect.

In the event the City brings suit upon this Bond, surety shall pay reasonable attorney’s fees and costs incurred by the City in such suit.

The Surety, for value received, stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the City of San Carlos may accept such BID; and said Surety does hereby waive notice of any such extension.

IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, this day and year first set forth.

By: (L.S.) By:
(Principal) (Seal) (Surety) (Seal) Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________ (Seal) My Commission expires __________________, 20_____
IMPORTANT: Surety companies executing BONDS must be authorized to transact Surety insurance in the State of California. If Contractor is Partnership, all partners should execute BOND.

8.k
February 27, 2023

Packet Pg. 256

Bid Proposal 2023 Sewer System Root Foaming Project
Page P-16 Project No. C1752-23
This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 257

Agreement 2023 Sewer System Root Foaming Project
Page A-1 Project No. C1752-23

AGREEMENT AND AGREEMENT FORMS

TABLE OF CONTENTS
Public Projects Agreement.......................................................................................... A-2 Exhibit A: Contractor’s Bid Proposal ......................................................................... A-10 Exhibit B: Insurance Coverage .................................................................................. A-11 Resolution of Construction Claims.............................................................................. A-12 Agreement Forms
Payment Bond................................................................................................. A-14 Performance Bond .......................................................................................... A-16 Workers Compensation Certification .............................................................. A-18 Certification of Safety Requirements for Contractors and Vendors ................ A-19 Drug Free Workplace Certification .................................................................. A-20 Escrow Agreement for Security Deposits in Lieu of Retention (Optional)....... A-21 Guarantee ....................................................................................................... A-23

8.k
February 27, 2023

Packet Pg. 258

Agreement 2023 Sewer System Root Foaming Project
Page A-2 Project No. C1752-23

AGREEMENT FOR PUBLIC PROJECTS
This Agreement is made and entered into as of __________________ by and between the City of San Carlos hereinafter called "CITY" and ____________________ hereinafter called "CONTRACTOR.”

RECITALS
This Agreement is entered into with reference to the following facts and circumstances:

A. That CITY desires to engage CONTRACTOR to provide a product and/or services to the CITY;
B. That CONTRACTOR is qualified to provide the product and/or services to the CITY and;
THEREFORE, the CITY has elected to engage CONTRACTOR upon the terms and conditions as hereinafter set forth.

1. Services. The services to be performed by CONTRACTOR under this Agreement are described in Exhibit A, the CONTRACTOR’S bid proposal which is, by this reference, incorporated herein and made a part hereof as though it were fully set forth herein.

Performance of the services specified in said Exhibit is hereby made an obligation of CONTRACTOR under this Agreement, subject to any changes that may be made subsequently hereto upon the mutual written agreement of the said parties.

Where in conflict, the terms of this Agreement supersede and prevail over any terms set forth in Exhibit A.

2. Term; Termination. (a) The term of this Agreement shall commence upon the date hereinabove written and shall expire upon the date enumerated in Exhibit A, delivery of the product or completion of performance of services hereunder by CONTRACTOR, whichever date shall first occur. (b) Notwithstanding the provisions of (a) above, CITY may terminate this Agreement without cause by giving written notice not less than thirty (30) days prior to the effective date of termination, which date shall be included in said notice. CITY shall compensate CONTRACTOR for any product delivered and/or for services rendered, and reimburse CONTRACTOR for costs and expenses incurred, to the date of termination, calculated in accordance with the provisions of paragraph 3. In ascertaining the services actually rendered to the date of termination, consideration shall be given both to completed work and work in process of completion.

8.k
February 27, 2023

Packet Pg. 259

Agreement 2023 Sewer System Root Foaming Project
Page A-3 Project No. C1752-23
Nothing herein contained shall be deemed a limitation upon the right of CITY to terminate this Agreement for cause, or otherwise to exercise such rights or pursue such remedies as may accrue to CITY hereunder.

3. Compensation; Expenses; Payment. CITY shall compensate CONTRACTOR for all products supplied or services performed by CONTRACTOR hereunder as shown in Exhibit A attached hereto and by this reference incorporated herein.

Notwithstanding the foregoing, the combined total of compensation and reimbursement of costs payable hereunder shall not exceed the sum of __________________$_________, as provided in the approved bid documents or in this Agreement unless additional amounts have been authorized in the acceptance of the bid and approved in advance of supplying the product, performing the services or incurring the costs and expenses by CITY’s City Manager (for contracts less than $175,000 or authorized by City Council action for contracts $175,000 or more by motion duly made and carried).

Compensation and reimbursement of costs and expenses hereunder shall be payable upon CONTRACTOR meeting contract milestones as defined in Exhibit A. Billing shall include an itemized statement, briefly describing by task and labor category or cost/expense items billed.

4. Contractor affirms that its employees and contractors comply with California Prevailing Wage Law.

5. Additional Services. In the event the public project requires the delivery of additional products or performance of additional services not otherwise included within Exhibit A, such products or services must be authorized in advance by CITY’s City Manager (for contracts less than $175,000 or authorized by City Council action for contracts $175,000 or more. Such amendment to this Agreement shall include a description of the project or services to be performed thereunder, the maximum compensation and reimbursement of costs and expenses payable therefore, the time of performance thereof, and such other matters as the parties deem appropriate. Any additional services causing the total contract price to exceed $175,000, shall require approval by the City Council. Except to the extent modified by written amendment, all other terms and conditions of this Agreement shall be deemed incorporated in each such amendment.

6. Records. CONTRACTOR shall keep and maintain accurate records of products delivered or of all time expended in performing services and costs and expenses incurred relating thereto. Said records shall be available to CITY for review and copying during regular business hours at

8.k
February 27, 2023

Packet Pg. 260

Agreement 2023 Sewer System Root Foaming Project
Page A-4 Project No. C1752-23
CONTRACTOR’s place of business or as otherwise agreed upon by the parties.

7. Authorization. This Agreement becomes effective when endorsed by both parties in the space provided below.

8. Reliance on Specialized Professional Skill of CONTRACTOR.

CONTRACTOR represents that it has the necessary professional skills to perform the services required and the CITY shall rely on such specialized skills of the CONTRACTOR to do and perform the work. In performing services hereunder CONTRACTOR shall adhere to the standards generally prevailing for the performance of services similar to those to be performed by CONTRACTOR hereunder.

9. Documents. All documents, plans, drawings, renderings, and other papers, or copies thereof, as finally rendered, prepared by CONTRACTOR pursuant to the terms of this Agreement, shall, upon preparation and delivery to CITY, become the property of CITY

10. Relationship of Parties. It is understood that the relationship of CONTRACTOR to the CITY is that of an independent contractor and all persons working for or under the direction of CONTRACTOR are its agents or employees and not agents or employees of the CITY.

11. Schedule. CONTRACTOR shall adhere to the schedule set forth in Exhibit A; provided, that CITY shall grant reasonable extensions of time for the delivery of products or performance of services occasioned by governmental reviews of CONTRACTOR’s work product or other unavoidable delays; provided, further, that such unavoidable delay shall not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, CONTRACTOR’s officers or employees.

CONTRACTOR acknowledges the importance to CITY of timely delivery of products or services and agrees to put forth its best professional efforts to perform in a manner consistent with that schedule.

12. Indemnity. CONTRACTOR shall indemnify and hold harmless City, its officers, employees, agents and volunteers from and against all liability, loss, damage, expense, and cost (including, without limitation, reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR’s negligence, recklessness, or willful misconduct in the performance of work hereunder, or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage caused by the active negligence or willful misconduct of the City. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and

8.k
February 27, 2023

Packet Pg. 261

Agreement 2023 Sewer System Root Foaming Project
Page A-5 Project No. C1752-23
inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

Nothing herein contained shall be construed to require CONTRACTOR to indemnify CITY, its officers, employees, agents and volunteers against any responsibility or liability in contravention of Section 2782 of the California Civil Code.

13. Insurance. CONTRACTOR shall acquire and maintain Workers’ Compensation, employer’s liability, commercial general liability, owned and non-owned and hired automobile liability insurance coverage relating to CONTRACTOR’s services to be performed hereunder covering CITY’s risks in form subject to the approval of the City Attorney and/or CITY’s Risk Manager. The minimum amounts of coverage corresponding to the aforesaid categories of insurance per insurable event shall be as follows:

Insurance Category Minimum Limits
Workers’ Compensation statutory minimum
Employer’s Liability $1,000,000 per accident for
bodily injury or disease.

Contractor shall submit to City a
Waiver of Subrogation
endorsement in favor of City, its
officers, agents, employees, and
volunteers.

Commercial General Liability $2,000,000 per occurrence for Liability bodily injury,
personal injury, and property
damage, including without
limitation, blanket contractual
liability and coverage for
explosion, collapse and
underground property damage
hazards. If a general aggregate
limit applies, either the general
aggregate limit shall apply
separately to this project/location
or the general aggregate limit
shall be twice the required
occurrence limit. Coverage must
be at least as broad as Insurance
Services Office form CG 00 01.

8.k
February 27, 2023

Packet Pg. 262

Agreement 2023 Sewer System Root Foaming Project
Page A-6 Project No. C1752-23
Automobile Liability $2,000,000 per accident for
bodily injury and property
damage (coverage required to
the extent applicable to
CONTRACTOR’s vehicle usage
in performing services hereunder)
Concurrently with the execution of this Agreement, CONTRACTOR shall furnish CITY with certificates and copies of information or declaration pages of the insurance required hereunder and, with respect to evidence of commercial general liability and automobile liability insurance coverage, original endorsements:
(a) Precluding cancellation or reduction in per occurrence limits before the expiration of thirty (30) days (10 days for nonpayment) after CITY shall have received written notification of cancellation in coverage or reduction in per occurrence limits by first class mail; (b) Contractor’s general liability policies shall be primary and non- contributory, and be endorsed using Insurance Services Office form CG 20 10 to provide that City and its officers, officials, employees, and agents shall be additional insureds under such policies. An endorsement providing completed operations coverage for the additional insured, ISO form CG 20 37, is also required.

Claims Made Policies
If any of the required policies provide claims-made coverage:

1. The Retroactive Date must be shown, and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the CONTRACTOR must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.

Verification of Coverage
CONTRACTOR shall furnish the CITY with original certificates and amendatory endorsements effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the CITY before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONTRACTOR’s obligation to provide them. The CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

8.k
February 27, 2023

Packet Pg. 263

Agreement 2023 Sewer System Root Foaming Project
Page A-7 Project No. C1752-23
Waiver of Subrogation
CONTRACTOR hereby grants to CITY a waiver of any right to subrogation which any insurer of said CONTRACTOR may acquire against the CITY by virtue of the payment of any loss under such insurance. This provision applies regardless of whether or not the CITY has requested or received a waiver of subrogation endorsement from the insurer.

Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.

Special Risks or Circumstances
CITY reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Coverage
It is a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be made available to the Additional Insured and shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy, whichever is greater.

CONTRACTOR shall maintain insurance as required by this contract to the fullest amount allowed by law and shall maintain insurance for a minimum of five years following completion of the project. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the city at its sole discretion may purchase the coverage required and the cost shall be paid by CONTRACTOR.

Primary and Non-Contributory Coverage
The Additional Insured coverage under the CONTRACTOR’s policy shall be “primary and non-contributory” as will not seek contribution from the CITY insurance or self-insurance and shall be at least as broad as CG 20 01 04 12.

Excess Insurance
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of CITY before the CITY insurance or self-insurance shall be called upon to protect it as a named insured.

8.k
February 27, 2023

Packet Pg. 264

Agreement 2023 Sewer System Root Foaming Project
Page A-8 Project No. C1752-23

14. SUBCONTRACTORS. CONTRACTOR agrees to include with all subcontractors in their subcontracts the same requirements and provisions of this agreement including the indemnity and Insurance requirements to the extent they apply to the scope of the Subcontractors’ work. Subcontractors hired by CONTRACTOR agree to be bound to CONTRACTOR and CITY in the same manner and to the same extent as CONTRACTOR is bound to CITY under the Contract documents.

Subcontract shall agree to include these same provisions in any agreement with a sub-subcontractor. CONTRACTOR shall require all subcontractors to provide a valid certificate of insurance and the required endorsements included in the agreement prior to commencement of any work and will provide proof of compliance to the CITY.

Subcontractor shall agree to be bound to CONTRACTOR and CITY in the same manner and to the same extent as CONTRACTOR is bound to CITY under the Contract Documents. Subcontractor shall further agree to include the same requirements and provisions of this agreement, including the indemnity and Insurance requirements, with a Sub-subcontractor to the extent they apply to the scope of the Sub-subcontractors’ work. A copy of the CITY Contract Document Indemnity and Insurance provisions shall be furnished to the subcontractor upon request.

15. WORKERS' COMPENSATION. CONTRACTOR certifies that he/she/it is aware of the provisions of the Labor Code of the State of California which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and CONTRACTOR certifies that he will comply with such provisions before commencing the performance of the work of this agreement.

16. NON-DISCRIMINATION. The CONTRACTOR will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The CONTRACTOR will take affirmative action to insure that applicants are employed and the employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include, but not be limited to the following: employment, advancement, demotion, transfer, recruitment, or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The CONTRACTOR shall at all times be in compliance with the requirements of the Federal Americans With Disabilities Act (Public Law 101-336) which prohibits discrimination on the basis of disability by public entities. The CONTRACTOR agrees to post in conspicuous places available to employees and applicants for employment any notices provided by the CITY setting forth the provisions of this non-discrimination clause.

8.k
February 27, 2023

Packet Pg. 265

Agreement 2023 Sewer System Root Foaming Project
Page A-9 Project No. C1752-23

17. Notice. All notices required by this Agreement shall be given to the CITY and CONTRACTOR in writing, by first class mail, postage prepaid, addressed as follows:

CITY: City of San Carlos
600 Elm Street
San Carlos, CA 94070
Attention: City Manager
CONTRACTOR: _____________________
Address
Phone
Attention: ______________

18. Non-Assignment. This Agreement is not assignable either in whole or in part.

19. Amendments. This Agreement may be amended or modified only by written agreement signed by both parties.

20. Business Registration. CONTRACTOR agrees to comply with Chapter

5.04 of the Municipal Code and pay all fees required to be paid.

21. Validity. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

22. Governing Law. This Agreement shall be governed by the laws of the State of California and any suit or action initiated by either party shall be brought in the County of San Mateo, California. In the event of litigation between the parties hereto to enforce any provision of the Agreement, the unsuccessful party will pay the reasonable attorney’s fees and expenses of litigation of the successful party.

23. Mediation. Should any dispute arise out of this Agreement, the parties shall meet in mediation and attempt to reach a resolution with the assistance of a mutually acceptable mediator. Neither party shall be permitted to file legal action without first meeting in mediation and making a good faith attempt to reach a mediated resolution. The costs of the mediator, if any, shall be paid equally by the parties. If a mediated settlement is reached neither party shall be deemed the prevailing party for purposes of the settlement and each party shall bear its own legal costs. If a party refuses or fails to participate in mediation in good faith prior to filing a lawsuit, then that party shall be barred from recovery of attorneys fees and costs of suit.

8.k
February 27, 2023

Packet Pg. 266

Agreement 2023 Sewer System Root Foaming Project
Page A-10 Project No. C1752-23

24. Conflict of Interest. CONTRACTOR may serve other clients, but none who are active within the City of San Carlos or who conduct business that would place CONTRACTOR in a "conflict of interest" as that term is defined in State law.

25. Entire Agreement. Each party acknowledges that this agreement, the exhibits hereto, and the documents incorporated by reference herein constitute the complete agreement and exclusive statement of the terms and conditions between the parties, which supercedes and merges all prior proposals, understandings and all other agreements, verbal and written, between the parties relating to the subject matter of this agreement. This agreement may not be modified or altered except by written instrument duly executed by both parties.
[SIGNATURE PAGE TO FOLLOW]

8.k
February 27, 2023

Packet Pg. 267

Agreement 2023 Sewer System Root Foaming Project
Page A-11 Project No. C1752-23

SIGNATURE PAGE

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date first above written by their respective officers duly authorized in that behalf.

CITY OF SAN CARLOS:

Dated: _________________________________ Jeff Maltbie, City Manager

ATTEST:

Dated:

________________________________
Crystal Mui, City Clerk
APPROVED AS TO FORM:

Dated:

Gregory J. Rubens, City Attorney

CONSULTANT/CONTRACTOR/VENDOR:

I acknowledge that I have full authority to execute this agreement on behalf of the Consultant/Contractor/Vendor, and have read, understand, and agree to comply with the provisions of this Agreement, including the Insurance and indemnity requirements set forth herein.

Dated:

8.k
February 27, 2023

Packet Pg. 268

Agreement 2023 Sewer System Root Foaming Project
Page A-12 Project No. C1752-23

EXHIBIT A
CONTRACTOR’S BID PROPOSAL
[This page to be used for other Exhibits to add on, if any]

8.k
February 27, 2023

Packet Pg. 269

Agreement 2023 Sewer System Root Foaming Project
Page A-13 Project No. C1752-23

EXHIBIT B
This INSURANCE COVERAGE FORM modifies or documents insurance provided under the following:

Named Insured: Effective Work Date(s):

Description of Work/Locations/Vehicles:

ADDITIONAL INSURED: City of San Carlos
600 Elm Street, San Carlos, CA 94070
Attention: _________________________________
Contract Administrator
Endorsement and Certificates of Insurance Required
The Additional Insured, its elected or appointed officers, officials, employees and volunteers are included as insureds with regard to damages and defense of claims arising from: (Check all that apply) Insurer Policy No.

General Liability: (a) activities performed by or on behalf of the Named Insured, (b) products and completed operations of the Named Insured, (c) premises owned, leased occupied or used by the Named Insured, and/or (d) permits issued for operations performed by the Named Insured. {Note:

MEETS OR EXCEEDS ISO Form # CG 20 10 11 85}
Auto Liability : the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Named Insured, regardless of whether liability is attributable to the Named Insured or a combination of the Named Insured and the Additional Insured, its elected or appointed officers, officials, employees or volunteers.

Other:

Certificates of Insurance Required (no endorsement needed) (Check all that apply)
Insurer Policy No.

Workers Compensation: work performed by employees of the Named Insured while those employees are engaged in work under the simultaneous directions and control of the Named Insured and the Additional Insured.

Professional Liability:

PRIMARY/NON-CONTRIBUTORY: This insurance is primary and is not additional to or contributing with any other insurance carried by or for the benefit of Additional Insureds.

SEVERABILITY OF INTEREST: The insurance afforded by this policy applies separately to each insured who is seeking coverage or against whom a claim is made or a suit is brought, except with respect to the insurer’s limit of liability.

PROVISIONS REGARDING THE INSURED'S DUTIES AFTER ACCIDENT OR LOSS: Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the Additional Insured, its elected or appointed officers, officials, employees, or volunteers.

CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days' prior written notice (ten (10) days if canceled due to non-payment) by regular mail return receipt requested has been given to the Additional Insured. Such notice shall be addressed as shown above.

WAIVER OF SUBROGATION: The insurer(s) named above agree to waive all rights of subrogation against the CITY/Public Works Departmentt, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the CITY/Public Works Department.

Nothing herein contained shall vary, alter or extend any provision or condition of the Policy other than as above stated.

SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE INSURER I, _______________________________________________________________(print/type name), warrant that I have authority to bind the above-named insurance company and by my signature hereon do so bind this company. ________________________________________________________________ _____________________ SIGNATURE OF AUTHORIZED REPRESENTATIVE (original signature required) DATE ISSUED ORGANIZATION:_________________________________________ TITLE:______________________________ ADDRESS: _____________________________________________ TELEPHONE: ( ) _______

8.k
February 27, 2023

Packet Pg. 270

Agreement 2023 Sewer System Root Foaming Project
Page A-14 Project No. C1752-23

RESOLUTION OF CONSTRUCTION CLAIMS
Any public works claims arising under this contract which the Contractor wishes to assert against the Governing Agency shall be governed by California Public Contract Code Section 9204. Claims which do not exceed three hundred seventy-five thousand dollars ($375,000) are also subject to the provisions of Article 1.5 of the California Public Contract Code (commencing with Section 20104). Pursuant to California Public Contracts Code Section 9204, claims shall be resolved as follows:
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

8.k
February 27, 2023

Packet Pg. 271

Agreement 2023 Sewer System Root Foaming Project
Page A-15 Project No. C1752-23
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor.

The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.

A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

8.k
February 27, 2023

Packet Pg. 272

Agreement 2023 Sewer System Root Foaming Project
Page A-16 Project No. C1752-23

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS, that
WHEREAS, The City of San Carlos (hereinafter referred to as “Owner”) and (hereinafter referred to as “Principal”) have entered into a contract for the construction of 2023 Sewer System Root Foaming Project, No. C1752-23 and WHEREAS, under the terms of said contract Principal is required to furnish a bond securing payment of the claims to which reference is made in Section 3248 of the Civil Code; NOW, THEREFORE, we, the Principal, and
, as Surety, are held and firmly bound unto the
“Owner” in the penal sum of
/l00 Dollars ($ )
lawful money of the United States, being not less than one hundred percent (100%) of the amount payable by the terms of the contract, for the payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

The condition of this obligation is such that if said Principal or any of its subcontractors fails to pay any of the persons named in Section 3181 of the Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board from the wages of employees of the Principal or its subcontractors pursuant to Section 18806 of the Revenue and Taxation Code, with respect to such work and labor that the Surety will pay for the same, in an amount not exceeding the amount hereinabove set forth and also will pay, in case suit is brought upon this bond, a reasonable attorney’s fee, to be fixed by the court. We hereby state and confirm that we are a “California admitted insurer” as defined by the California Department of Insurance.

This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

This bond is given to comply with Sections 3247 and 3248 of the Civil Code. The liability of the Principal and Surety hereunder is governed by the provisions of said Code, all acts amendatory thereof, and all other statutes referred to therein, including Section 3225 of the Civil Code.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed there under or the specifications accompanying the same shall in any ways affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.

8.k
February 27, 2023

Packet Pg. 273

Agreement 2023 Sewer System Root Foaming Project
Page A-17 Project No. C1752-23
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this _________ day of __________________, 20 , the name and corporate seal of each corporate body being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. (Principal)
NOTE: By
To be signed by By
Principal and Surety
and acknowledgment
and nortarial seal
(Surety)
By
By

8.k
February 27, 2023

Packet Pg. 274

Agreement 2023 Sewer System Root Foaming Project
Page A-18 Project No. C1752-23

PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS, that
WHEREAS, the City of San Carlos (hereinafter referred to as “Owner”) has entered into a contract with _ ___________________ (hereinafter referred to as “Principal”) for the construction of 2023 Sewer System Root Foaming Project, No. C1752-23, and WHEREAS, said Principal is required under the terms of said contract to furnish a bond of faithful performance of said Contract;
NOW, THEREFORE, we, the Principal, and
, as Surety, are held and firmly bound unto the
“Owner” in the penal sum of _____________________________/100 Dollars($ ) lawful money of the United States, being a sum equal to the total amount payable under the contract, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounded Principal shall in all things stand to and abide by and well and truly keep and perform the covenants, conditions and agreements in the said contract and any alteration thereof made as therein provided, on his part to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.

As a condition precedent to satisfactory completion of the said contract, the above obligations to the amount of and-00/100 Dollars ($ ) being not less than ten percent (10%) of the total amount payable under the contract, shall hold good for a period of two (2) years after the completion and acceptance of said work, during which time if the above Principal shall fail to make full, complete and satisfactory repair and replacement or totally protect the “Owner” from loss or damage made evident during said period of two (2) years from the date of acceptance of said work, and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, the above obligations in the said sum of and-00/100 Dollars ($ ) shall remain in full force and virtue; otherwise the above obligation shall be void.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed there under of the Specifications accompanying the same shall in any ways affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the Specifications. We hereby state and confirm that we are a “California admitted insurer” as defined by the California Department of Insurance.

In the event that the “Owner” or its successors or assigns, shall be the prevailing party in an action brought upon this bond, then, in addition to the penal sum hereinabove specified, we agree to pay to the “Owner” for its successors or assigns, a reasonable sum on account of attorney’s fees in such action, which sum shall be fixed by the court.

8.k
February 27, 2023

Packet Pg. 275

Agreement 2023 Sewer System Root Foaming Project
Page A-19 Project No. C1752-23
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this _________ day of __________________, 20 , the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to the authority of its governing body. (Principal)
NOTE: By
To be signed by By
Principal and Surety
and acknowledgment
and nortarial seal
(Surety)
By
By

8.k
February 27, 2023

Packet Pg. 276

Agreement 2023 Sewer System Root Foaming Project
Page A-20 Project No. C1752-23

WORKERS' COMPENSATION CERTIFICATION
Labor Code Section 1861
The Bidder hereby certifies as follows:
"I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions and furnish proof of said insurance before commencing the performance of the work of this contract."
Name of Contractor
Signature of Contractor Representative
Dated: __________________________
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.

8.k
February 27, 2023

Packet Pg. 277

Agreement 2023 Sewer System Root Foaming Project
Page A-21 Project No. C1752-23

CERTIFICATION OF SAFETY REQUIREMENTS FOR

CONTRACTORS AND VENDORS
California Code of Regulations, Title 8, Section 1509
To work as a contractor or vendor with the City of San Carlos, your organization is required to certify that it has an active on-the-job written Injury and Illness Prevention Program. This program is essential to make the job as accident-free as possible and to comply with Federal and State Safety Standards.

The undersigned hereby certifies that his/her organization has an active written Injury and Illness Prevention Program, as required by Cal-OSHA under California Code of Regulations, Title 8, General Industry Safety Orders, Section 3203 and/or Construction Safety Orders, Section 1509, that ensures compliance with, and enforcement of, current minimum Cal-OSHA Safety Standards, and that his/her organization has knowledge of these standards that are applicable to the job operations. This includes a program for ensuring employees have been trained to recognize hazards of their job.

The undersigned also hereby certifies that his/her organization has an active written Hazard Communication Program with evidence that all employees have been trained in safe use and handling of chemicals on the job site, and a file will be made available for review by the City of San Carlos of each Material Safety Data Sheet (MSDS) on those chemicals kept on the site.

Name of Contractor
Signature of Contractor Representative
Dated: __________________________
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.

8.k
February 27, 2023

Packet Pg. 278

Agreement 2023 Sewer System Root Foaming Project
Page A-22 Project No. C1752-23

DRUG-FREE WORKPLACE CERTIFICATION
The bidder_________________________________________________________________, hereby certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. The contractor will:

1. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as required by Government Code Section 8355(a).

2. Establish a Drug-Free Awareness Program as required by Government Code Section 8355(b), to inform employees about all of the following:
(a) The dangers of drug abuse in the workplace,
(b) The person’s or organization’s policy of maintaining a drug-free workplace, (c) Any available counseling, rehabilitation and employee assistance programs, and (d) Penalties that may be imposed upon employees for drug abuse violations.

3. Provide as required by Government Code Section 8355(c), that every employee who works on the proposed contract or loan:
(a) Will receive a copy of the company’s drug-free policy statement, and (b) Will agree to abide by the terms of the company’s statement as a condition of employment on the contract or loan.

I, the official named below, hereby swear that I am duly authorized legally to bind the contractor to the above described certification. I am fully aware that this certification, executed on the date below, is made under penalty of perjury under the laws of the State of California.

Dated:_______________________, 20____.
________________________________
Contractor’s Signature
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.

8.k
February 27, 2023

Packet Pg. 279

Agreement 2023 Sewer System Root Foaming Project
Page A-23 Project No. C1752-23
ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION (Optional) Public Contract Code Section 22300
This Escrow Agreement is made and entered into by and between _______________________________ whose address is __________________________________________________ hereinafter called "Owner,"________________________________ whose address is ______________________________
____________________hereinafter called "Contractor" and ____________________________________ whose address is __________________________________________ hereinafter called "Escrow Agent." For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to
deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for __________________ in the amount of _______________ dated __________ (hereinafter referred to as the "Contract"). Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit.

The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of ____________________, and shall designate the Contractor as the beneficial owner.
(2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld
from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above.
(3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly. (4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering
the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent.
(5) The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. (6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written
notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner

8.k
February 27, 2023

Packet Pg. 280

Agreement 2023 Sewer System Root Foaming Project
Page A-24 Project No. C1752-23
consents to the withdrawal of the amount sought to be withdrawn by Contractor. (7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor.

Upon seven (7) days written notice to the Escrow Agent from the owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner. (8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges. (9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5)
to (8), inclusive, of this agreement and the Owner and Contractor shall hold Escrow Agent harmless from Escrow
Agent's release and disbursement of the securities and interest as set forth above. (10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:

On behalf of Owner: On behalf of Contractor: On behalf of Escrow Agent:
___________________________ ___________________________ _______________________________
Title Title Title
___________________________ ___________________________ _______________________________
Name Name Name
___________________________ ___________________________ _______________________________
Signature Signature Signature
___________________________ ___________________________ _______________________________
Address Address Address
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully
executed counterpart of this Agreement.

IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.

Owner: Contractor:
______________________________ ___________________________________ Title Title
______________________________ ___________________________________ Name Name

8.k
February 27, 2023

Packet Pg. 281

Agreement 2023 Sewer System Root Foaming Project
Page A-25 Project No. C1752-23
______________________________ ___________________________________ Signature Signature

8.k
February 27, 2023

Packet Pg. 282

Agreement 2023 Sewer System Root Foaming Project
Page A-26 Project No. C1752-23

GUARANTEE
(To Be Submitted Prior to Project Acceptance)

FOR THE
City of San Carlos
San Carlos, CA 94070
2023 Sewer System Root Foaming Project
Project No. C1752-23
We hereby guarantee that the work we have installed for the above named project has been done in accordance with the Plans and Specifications and that the work installed will fulfill the requirements of the guarantee.

We agree to repair or replace any or all of our work, together with any other adjacent work which may be displayed in so doing that may prove to be defective in its workmanship or material within a period of two (2) years from the date of acceptance of the above-named work by the City of San Carlos, without any expense whatsoever to the City of San Carlos, ordinary wear and tear and unusual abuse or neglect excepted.

Within fifteen (15) days after being notified in writing by the City of San Carlos of any defects in the work, we agree to commence and prosecute with due diligence all work necessary to fulfill the terms of this guarantee, and to complete the work within a reasonable period of time, and in the event of our failure to so comply, we collectively and separately, do hereby authorize said City of San Carlos to proceed to have such work done at our expense and we will honor and pay the cost and changes therefore upon demand.

Dated:

By:

NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO PROJECT ACCEPTANCE.

8.k
February 27, 2023

Packet Pg. 283

GENERAL PROVISIONS

8.k
February 27, 2023

Packet Pg. 284

v
This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 285

i

TABLE OF CONTENTS
SECTION 1 – TERMS AND DEFINITIONS

1.01 Terms ................................................................................................................................. 1

1.02 Definitions........................................................................................................................... 1 SECTION 2 – PROPOSAL REQUIREMENTS AND CONDITIONS

2.01 General............................................................................................................................... 6

2.02 Proposal Forms.................................................................................................................. 6

2.03 Qualifications of Bidders..................................................................................................... 6

2.04 Rejection of Proposals Containing Alterations, Erasures, or Irregularities......................... 6

2.05 Submission of Bids............................................................................................................. 6

2.06 Approximate Estimate ........................................................................................................ 7

2.07 Examination of Plans, Specifications and Work Site.......................................................... 7

2.08 Withdrawal of Proposals..................................................................................................... 7

2.09 Proposal Guarantee ........................................................................................................... 7

2.10 Disqualification of Bidders.................................................................................................. 7

2.11 Bid Protest Procedures ...................................................................................................... 7

2.12 List of Subcontractors......................................................................................................... 8

2.13 Required Contractor and Subcontractor Registration ........................................................ 8 SECTION 3 – REVIEW OF BIDS, CONTRACT AWARD AND EXECUTION

3.01 Public Bid Opening and Initial Review ............................................................................... 9

3.02 Determination of Lowest Responsible Bidder .................................................................... 9

3.03 Notice of Award.................................................................................................................. 10

3.04 Contract Execution............................................................................................................. 10

3.05 Status of Contractor ........................................................................................................... 10

3.06 Assignment......................................................................................................................... 10

3.07 Recognition of Subcontractors ........................................................................................... 10

3.08 Return of Bid Security ........................................................................................................ 10

3.09 Forfeiture of Proposal Guarantee....................................................................................... 11

3.10 Contract Bonds................................................................................................................... 11

3.11 Notification of Surety Companies....................................................................................... 12

3.12 Power of Attorney............................................................................................................... 12

3.13 Insurance Requirements .................................................................................................... 12

3.14 Special Requirements ........................................................................................................ 12

3.15 Builders Risk Insurance...................................................................................................... 13

3.16 Certificates ......................................................................................................................... 13

3.17 Legal Address of Contractor............................................................................................... 13

3.18 Office of Contractor at Site................................................................................................. 13 SECTION 4 – SCOPE AND CONTROL OF THE WORK

4.01 Work to be Done ................................................................................................................ 14

4.02 Plans and Specifications .................................................................................................... 14

4.03 Reference to Standards and Codes................................................................................... 14

4.04 Authority of the Engineer.................................................................................................... 15

4.05 Contract Documents and Precedence ............................................................................... 15

4.06 Interpretation of Specifications and Drawings.................................................................... 15

4.07 Figured Dimensions ........................................................................................................... 15

4.08 Errors or Discrepancies...................................................................................................... 16

4.09 Drawings to be Furnished by Contractor............................................................................ 16

4.10 Additional Drawings by City................................................................................................ 16

4.11 Lines and Grades............................................................................................................... 16

4.12 Record Documents............................................................................................................. 16

4.13 Record Drawings................................................................................................................ 16

4.14 Reuse of Documents.......................................................................................................... 17

4.15 Subsurface Data................................................................................................................. 17

4.16 Right-of-Way ...................................................................................................................... 17

4.17 Removal of Defective and Unauthorized Work .................................................................. 17

4.18 Acceptance of Defective Work ........................................................................................... 17

8.k
February 27, 2023

Packet Pg. 286

ii

4.19 Submittals........................................................................................................................... 17

4.20 Substitutions....................................................................................................................... 18

4.21 Construction Staking Lines and Grades............................................................................. 19

4.12 Inspection of the Work........................................................................................................ 19

4.23 Testing................................................................................................................................ 19 SECTION 5 – CHANGES IN WORK

5.01 Limited City Authority to Approve Change Orders ............................................................. 21

5.02 Contractor Liability for Unapproved Change Orders .......................................................... 21

5.03 Non-Material Change Requests by the Contractor ............................................................ 21

5.04 Effect of Extension of Time ................................................................................................ 21

5.05 Letters of Instruction........................................................................................................... 21

5.06 Requests for Information, Inconsistencies and Changed Conditions................................. 21

5.07 Extra and Omitted Work..................................................................................................... 22

5.08 Change Orders................................................................................................................... 22

5.09 Disputed Work.................................................................................................................... 24 SECTION 6 – CONTROL OF MATERIALS

6.01 Materials and Workmanship............................................................................................... 25

6.02 Protection of Work and Materials ....................................................................................... 25

6.03 Trade Names or Equals ..................................................................................................... 25

6.04 Inspection of Materials by City ........................................................................................... 26

6.05 Inspection of Materials by Others....................................................................................... 26

6.06 Tests of Materials............................................................................................................... 26

6.07 Certification ........................................................................................................................ 26

6.08 Weighing and Metering Equipment .................................................................................... 26

6.09 Calibration of Testing Equipment ....................................................................................... 27 SECTION 7 – UTILITIES

7.01 City’s Statutory Obligation.................................................................................................. 28

7.02 Contractor’s Obligation to Identify and Protect Subsurface Infrastructure ......................... 28

7.03 Location.............................................................................................................................. 28

7.04 Protection ........................................................................................................................... 29

7.05 Shut Down Notification....................................................................................................... 29

7.06 Removal ............................................................................................................................. 29

7.07 Relocation .......................................................................................................................... 29

7.08 Delays ................................................................................................................................ 30

7.09 Cooperation........................................................................................................................ 30 SECTION 8 – PROSECUTION AND PROGRESS

8.01 Notice to Proceed............................................................................................................... 31

8.02 Commencement of Work.................................................................................................... 31

8.03 Subcontracting ................................................................................................................... 31

8.04 Administrative Duties.......................................................................................................... 31

8.05 Baseline Construction Schedule ........................................................................................ 31

8.06 Three-Week Look Ahead Schedule ................................................................................... 31

8.07 Construction Sequence...................................................................................................... 32

8.08 Recording Existing Conditions ........................................................................................... 32

8.09 Preconstruction Conference............................................................................................... 32

8.10 Progress Meeting ............................................................................................................... 32

8.11 Hours of Construction......................................................................................................... 32

8.12 Prosecution of Work........................................................................................................... 32

8.13 Suspension of Work ........................................................................................................... 33

8.14 Default by the Contractor and Termination of Control........................................................ 33

8.15 Contractor’s Right to Stop Work or Terminate Contract..................................................... 34

8.16 City’s Right to Terminate Contract ..................................................................................... 34

8.17 Time of Completion and Days Charged ............................................................................. 35

8.18 Liquidated Damages .......................................................................................................... 35

8.19 Delays and Extension of Time............................................................................................ 36

8.20 Substantial Completion ...................................................................................................... 38

8.21 Project Closeout................................................................................................................. 38

8.k
February 27, 2023

Packet Pg. 287

iii

8.22 Final Completion ................................................................................................................ 38

8.23 Final Acceptance................................................................................................................ 39

8.24 Risk of Loss........................................................................................................................ 39

8.25 Use of Improvements During Construction ....................................................................... 39 SECTION 9 – RESPONSIBILITIES OF THE CONTRACTOR

9.01 Contractor’s Responsibility for the Work ............................................................................ 40

9.02 Contractor’s Responsibility for Subcontracted Work.......................................................... 40

9.03 Superintendent................................................................................................................... 40

9.04 Character of Workers ......................................................................................................... 40

9.05 Laws to be Observed ......................................................................................................... 40

9.06 Permits and Fees ............................................................................................................... 42

9.07 Coordination and Cooperation ........................................................................................... 42

9.08 Use of Premises................................................................................................................. 43

9.09 Construction Staging and Field Office................................................................................ 43

9.10 Site Security ....................................................................................................................... 44

9.11 Construction Water............................................................................................................. 44

9.12 Project Site Maintenance ................................................................................................... 44

9.13 Preservation of Property..................................................................................................... 46

9.14 Protection of Buried Utilities ............................................................................................... 47

9.15 Protection of Bridges.......................................................................................................... 47

9.16 Protection of Traffic Signal Facilities .................................................................................. 47

9.17 Restoration of Adjacent and Existing Improvements ......................................................... 48

9.18 Archeological Remains....................................................................................................... 48

9.19 Access to Private Property................................................................................................. 48

9.20 Traffic Control and Public Convenience............................................................................. 48

9.21 Safety ................................................................................................................................. 51

9.22 Patent Fees or Royalties.................................................................................................... 53

9.23 Advertising.......................................................................................................................... 53

9.24 Antitrust Claims .................................................................................................................. 53

9.25 Audit and Examination of Records..................................................................................... 53

9.26 Notice of Entrance.............................................................................................................. 54

9.27 Additional and Emergency Protection ................................................................................ 54

9.28 Placing Portions of Work in Service ................................................................................... 54

9.29 Rights of Way..................................................................................................................... 54 SECTION 10 – MEASUREMENT AND PAYMENT

10.01 Measurement of Quantities for Unit Price Work................................................................. 55

10.02 Bid Items ............................................................................................................................ 55

10.03 Bid Quantities..................................................................................................................... 55

10.04 Progress Payments............................................................................................................ 56

10.05 Retentions .......................................................................................................................... 57

10.06 Final Payment .................................................................................................................... 58

10.07 Acceptance......................................................................................................................... 59

10.08 Compensation for Extra Work Omitted............................................................................... 59

10.09 Compensation to City for Extension of Time...................................................................... 59

10.10 Claims ................................................................................................................................ 59

10.11 Time Limit on Claims.......................................................................................................... 59

10.12 City Response to Claims.................................................................................................... 60

10.13 Appeal of Engineer’s Decision ........................................................................................... 60 SECTION 11 – GUARANTEE

11.01 Contractor’s Guarantee...................................................................................................... 61

11.02 Correction of Defective Work During the Guarantee Period .............................................. 61 * * *

8.k
February 27, 2023

Packet Pg. 288

General Provisions 2023 Sewer System Root Foaming Project Page P-1 Project No. C1752-23

GENERAL PROVISIONS
SECTION 1 – TERMS AND DEFINITIONS

1.01 Terms – Unless otherwise stated, the words “directed, required, permitted, ordered, instructed, designated, considered necessary, prescribed, approved, acceptable, satisfactory,” or words of like meaning, refer to actions, expressions, and prerogatives of the Engineer.

1.02 Definitions – Except as amended or supplemented, whenever in the Contract Documents the following terms are used, the intent and meaning shall be interpreted as follows:

Agreement - The written contract documents between the City and the Contractor covering the performance of the work.

As Shown, As Indicated, As Detailed - Where these words or words of similar import, are used, it shall be understood that reference to the drawings accompanying these specifications is made unless stated otherwise. Where "As Directed", "As Permitted", "Approved", or words of similar import, are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the Engineer is intended unless stated otherwise. As used herein, "Provide" shall be understood to mean "Provide Complete in Place" that is, "Furnish and Install”, and "Install" shall mean the installation complete in place of an item of equipment furnished by the City.

ASTM - American Society for Testing and Materials specifications.

AWWA - American Water Works Association and its Standard Specifications.

Addenda - Written or graphic instruments issued prior to the opening of bids which clarify, correct or change the bidding documents or the Contract Documents.

Bid - The offer or proposal of the bidder submitted on the prescribed forms setting forth the prices for the work to be performed.

Bid Forms - Includes the Bid Schedule, Designation of Subcontractors, Bidders Statement of Responsibility, Bidder’s Non-Collusion Affidavit, Bid Security, and all other information requested by the Bid Proposal Documents.

Bidder – Any individual, firm, partnership, corporation, or combination thereof submitting a bid for the work, acting directly or through a duly authorized representative. After the City awards the Contract, the term “Bidder” shall be equivalent to the term “Contractor” for the purpose of identifying the Contractor’s rights and obligations under the Contract Documents.

Bidding Documents - The Notice Inviting Sealed Proposals, Instruction to Bidders, Bid Proposal forms and Bidders Bond.

Bonds - Bid, performance, labor and material, and warranty bonds and other instruments of security.

Change Orders – A written order by the Engineer to the contractor making changes in the plans or specifications which is signed by the Contractor and City authorizing an addition, deletion or revision in the work, with possible adjustment in the contract price or the contract time, issued on or after the effective date of the Agreement. If the change involves items for which there is no contract unit price, the order shall so state and stipulate that the changes shall be performed as extra work or work omitted.

8.k
February 27, 2023

Packet Pg. 289

General Provisions 2023 Sewer System Root Foaming Project Page P-2 Project No. C1752-23
City - The City of San Carlos acting through the City Council or any other board, body, official(s) to which or to whom the power belonging to the City Council has been properly delegated.

City Regulations - All written laws, rules, and policies established by the City, including those set forth in the General Plan, San Carlos Municipal Code, ordinances, resolutions, policies, procedures, and City design documents (including the Standard Specifications, design standards, and relevant Public Facility Master Plans).

Code – The terms Government Code, Labor Code, etc., refer to codes of the State of California.

Contract – See definition for “Agreement”.

Contract Documents - See Agreement, Section 2.1, “List of Contract Documents and Precedence”.

Contract Drawings or Plans - All drawings which may have been prepared by or in behalf of the City, as a basis for proposals, when duly signed and made a part of this contract by incorporation or reference, all drawings submitted in pursuance of the terms of this contract by the successful bidder with his proposal and by the contractor to the City and reviewed by the Engineer; and all drawings submitted by the Engineer to the contractor during the progress of the work as provided for herein.

Contract Price - The total amount of money for which contract is awarded and as amended.

Contract Time - The number of days or the date stated in the contract as the duration for completing work.

Contract Unit Price - The Contractor’s original bid for a single unit of an item of work in the proposal.

Contractor - An individual, partnership, corporation, developer, joint venture, subdivider or other legal entity entering into a contract or agreement with the City to perform the work covered by this contract, and their authorized agents or legal representatives. After the City awards the Contract, the term “Contractor” shall be equivalent to the term “Bidder” for the purpose of identifying the Contractor’s rights and obligations under the Contract Documents.

Day or Days - Unless herein otherwise expressly defined, shall mean a calendar day of twenty-four hours each.

Defective Work - Work that is unsatisfactory, faulty, omitted, incomplete, deficient, or does not conform to the requirements of the Contract Documents, directives of the Engineer, or requirements of any inspection, reference standard, test, or approval specified in the Contract Documents, or has been damaged prior to the Engineer’s recommendation of final acceptance. See General Provisions Section

6.01, “Materials and Workmanship”.

Directive – Any document, signed by the City, with instruction to the Contractor pertaining to the completion of a project objective; including, but not limited to responses to requests for information, clarifications, letters of instruction, the notice of award and the notice to proceed.

Engineer - The Engineer duly and officially appointed by the City to represent the City and to observe the work of construction under this contract, acting personally or through agents or assistants duly authorized by him, such agents or assistants acting within the scope of the particular duties entrusted to them.

Extra Work - Performance or furnishing of work or material found necessary for the proper completion of the improvements, the payment of which is not covered by any item of the bid schedule and for which no means of payment, direct or indirect, has been provided in the contract.

8.k
February 27, 2023

Packet Pg. 290

General Provisions 2023 Sewer System Root Foaming Project Page P-3 Project No. C1752-23
Final Completion - The point at which work has been completed in accordance with the contract documents, plans and specifications to the satisfaction of the Engineer and there are no items of work remaining to be completed. See General Provisions, Section 8.22, “Final Completion”.

Force Account Work – Force account work is a method of compensation utilized to pay for extra work typically needed to overcome unanticipated work, resulting from the project work scope, necessary to complete the project work scope that cannot be well defined prior to the start of extra work. General Provision, Section 5.08 “Change Orders“ establishes the specific methods of compensation for labor, materials and equipment used to perform the force account work.

Greenbook - The Standard Specifications and Plans written and promulgated by Public Works Standards, Inc., entitled “Standard Specifications for Public Works Construction”, and “Standard Plans for Public Works Construction”, current editions.

Hold Harmless - Agreement by one party to bring no claim for negligence, breach of contract, indemnity or otherwise against another party. See Agreement Section 17, “Indemnification”.

Inspector - The engineering or technical inspector(s) duly authorized or appointed by the Engineer or City, limited to the particular duties entrusted to him or them.

Liquidated Damages - The amount of dollars assessed for each and every calendar day required to complete the contract in excess of the contract time. See General Provisions, Section 8.18, “Liquidated Damages”.

Losses - Any and all losses, costs, liabilities, claims, damages, and expenses, including, without limitation, reasonable attorneys’ fees and expenses.

Manual of Uniform Traffic Control Devices (MUTCD) or California Manual of Uniform Traffic Control Devices (CAMUTCD) – The latest edition of the California Manual of Uniform Traffic Control Devices.

Modification – Modifications to the Agreement are executed by change orders, and may only be issued after the effective date of the contract.

Notice - Any notice allowed or required to be given by the City may be given by the Engineer.

Notice of Award – The written notice by the City to the successful Bidder stating that upon completion of required conditions the City will execute the contract.

Notice to Proceed – A written notice by the City to the Contractor authorizing the Contractor to proceed with the work and fixing the date on which the contract time will start.

Plans - The contract plans and/or supplemental drawings approved by the Engineer which show the location, character, dimensions and details of the work.

Project - The total construction of which the work performed under the Contract Documents may be the whole or a part and which may include construction by the City or by separate Contractors.

Proposal - The offer of a bidder when submitted on the proposal form, properly signed and guaranteed.

Reference Specifications - Those standards, rules, method of tests or analysis, codes, and specifications of other agencies, engineering societies, or industrial associations referred to in the Contract Documents. These refer to the current edition or amendments in effect at the time of advertising the project unless specifically referred to by edition, volume or date. Unless otherwise stated in the plans or specifications, the reference specification in effect shall be that edition which was in effect on the date of the Notice Inviting Bids.

8.k
February 27, 2023

Packet Pg. 291

General Provisions 2023 Sewer System Root Foaming Project Page P-4 Project No. C1752-23
Shop Drawings - All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for the Contractor to illustrate some portion of the work and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams and other information prepared by a supplier and submitted by the Contractor to illustrate material or equipment for some portion of the work. See General Provisions, Section 4.19, “Submittals”.

Special Provisions - Any provisions which supplement or modify these standard specifications.

Specifications – The information, directions, provisions and requirements pertaining to the work, and contained herein including Special Provisions, Technical Specification, General Provisions, those administrative subsections of Caltrans’ Standard Specification that are specifically referenced in this Contract and the non-administrative sections (Section 10 through 95) of the Caltrans’ Standard Specification dated 2010.

Standard Plans - The Standard Details of the City of San Carlos, current edition, including the Parks and Streetscape Standard Plans, current edition, identifying construction standards for the various items of work indicated and/or referred to on the plans, specifications or special provisions.

Standard Specifications - The Standard Specifications of the City of San Carlos.

Standard Specifications for Public Works Construction - The Standard Specifications for Public Works Construction, “Greenbook”, current edition.

State - State of California.

State Standard Plans - The Standard Plans of the Department of Transportation of the State of California, (Caltrans’) Standard Plans dated 2010.

State Standard Specifications - The Standard Specifications of the Department of Transportation of the State of California Caltrans’ Standard Specification dated 2010.

Subcontractor - Any individual, firm or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the work at the site. Unless otherwise specifically provided, the term Subcontractor includes Subcontractor of any tier, suppliers, manufacturers and distributors. See Section 3.07 of the General Provisions.

Substantial Completion – When the work (or a specified part thereof) has progressed to the point where it is sufficiently complete and in accordance with the Contract Documents. See General Provisions, Section 8.20, “Substantial Completion”.

Superintendent – The executive representative of the contractor responsible for the site supervision of the work at all times during progress, authorized to receive and fulfill instructions from the Engineer and to accept orders for changed and extra work.

Surety - Any individual, firm or corporation, bound with and for the Contractor for the acceptable performance and completion of the work, and the satisfaction of all obligations incurred.

Surveyor - A land surveyor licensed in the State of California.

Unbalanced Bid - See Materially Unbalanced Bid and Mathematically Unbalanced Bid.

Work - The construction and services required by the Contract Documents as amended by contract modifications, whether completed or partially completed, including all labor, materials, equipment, tools, and services provided or to be provided, by the Contractor to fulfill the Contractor’s obligations. The work may constitute the whole or a part of the project

8.k
February 27, 2023

Packet Pg. 292

General Provisions 2023 Sewer System Root Foaming Project Page P-5 Project No. C1752-23
Working Day – Any day except Saturday, Sunday, Holidays observed by the City, or days in which the Contractor is entitled to an excusable delay. Holidays observed by the City are: Thanksgiving, day after Thanksgiving, Christmas Day, New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, and Veteran’s Day. See General Provisions, Section 8.19, “Delays and Extension of Time”. In addition, at the option of the Engineer, the contractor may be required to suspend all work and activities during the City’s annual Holiday Closure in late December and early January of each year. No work shall be done during this suspension except such work as is necessary for the proper care and protection of work already performed, or except in case of an emergency, and in any case, only with prior written permission of the Engineer. This suspension of work will be at no cost to the City. Working days will not be assessed during this suspension of work.

8.k
February 27, 2023

Packet Pg. 293

General Provisions 2023 Sewer System Root Foaming Project Page P-6 Project No. C1752-23
SECTION 2 – PROPOSAL REQUIREMENTS AND CONDITIONS

2.01 General - Bidders may obtain complete sets of the Contract Documents, including the proposal forms to be used for bidding, at the location designated in the Notice to Bidders. Bidders shall use complete sets of Contract Documents in the preparation of bids. The City makes copies of the Contract Documents available, on the above terms, for the sole purpose of obtaining Bids for the work and does not confer a license or grant permission for any other use of the Contract Documents.

2.02 Proposal Forms – The portion of the Contract Documents entitled “Bid Proposal” focuses the Bidders attention on the requirements for submitting a proposal, including the Notice to Bidders, and the Bid Proposal Forms.

Bids are required for the entire work described herein and shall be submitted on the blank forms prepared by the City and provided herein. The Bid Proposal submitted to the City shall consist of the completed Bid Schedule, Designation of Subcontractors, Bidders Statement of Responsibility, Bidder’s Non-Collusion Affidavit, Bidder’s Qualifications, Bidders References, Signature of Bidder, Bid Guaranty, and all other information requested by the Bid Proposal documents.

All proposals shall type or print legibly in ink the proposed prices both in writing and in figures and shall be signed, with address included, by the bidder or the bidder's authorized representative. Corrections must all be individually initialed by the Bidder. Bidder shall not modify or qualify the Bid Forms in any manner.

The Bid Forms shall be signed by a person or persons legally authorized to bind the Bidder to the Contract. The individuals signing each document shall warrant that they are authorized to bind the legal entity of the Bidder. Proposals made by individuals must show the individual's signature and post office address; if made by a firm or partnership and the signature of one or all of the partners must be shown.

Proposals submitted by corporations must show the name and post office address of the corporation, the name of the state, under whose laws the corporation is chartered, and the signature and title of the person signing on behalf of the corporation.

2.03 Qualifications of Bidders - Each bidder shall be licensed as specified in the Notice to Bidders and in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code, State of California, and shall be skilled and regularly engaged in the general class or type of work called for under this contract.

It is the intention of the City to award a contract only to a bidder who is able to furnish satisfactory evidence that he has the requisite experience and ability and that he has sufficient capital, facilities and plant to enable him to prosecute the work successfully and promptly, and to complete it within the time set forth in the contract.

In determining the degree of responsibility to be credited to a bidder, the City will weigh any evidence indicating the bidder, or personnel guaranteed to be employed in responsible charge of the work, has satisfactorily performed other contracts of like nature and magnitude.

2.04 Rejection of Proposals Containing Alterations, Erasures, or Irregularities - Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete bids, irregularities of any kind, or corrections and erasures without initials by the Bidder.

2.05 Submission of Bids - All Bid Forms, including all documents required to be submitted with the Bid, shall be enclosed in a sealed opaque envelope. The envelope shall be clearly marked on its face with the Bidder’s name and address, and the notation “SEALED BID ENCLOSED, CITY OF SAN CARLOS”, with an identification of the project name and number as identified in the Notice to Bidders. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope. Oral, telephonic, facsimile, telegraphic, or electronically transmitted Bids are invalid and will not be accepted.

8.k
February 27, 2023

Packet Pg. 294

General Provisions 2023 Sewer System Root Foaming Project Page P-7 Project No. C1752-23
Bids may be mailed or delivered by messenger. It is the Bidder’s responsibility alone to ensure that the Bid is received prior to the bid opening deadline at the place specified in the Notice to Bidders.

Whether or not bids are opened exactly at the time fixed in the public notice inviting bids, any bid received after that time shall be returned unopened.

2.06 Approximate Estimate - The quantities listed in the bid schedule are approximate only, supplied as a general indication of the scope of work and to be used as a basis for comparing bids. The City does not expressly or by implication agree that the actual amount of work will correspond therewith, and reserves the right to increase or decrease the amount of any class or portion of the work, or to delete any portions of the work in their entirety, from the quantities listed on the bid schedule, as may be deemed necessary or advisable by the Engineer.

2.07 Examination of Plans, Specifications and Work Site - Bidder shall examine carefully the plans, specifications, proposal and contract forms, and the physical site of the work contemplated, regardless of if a site walk or pre-bid meeting has been scheduled by the City or not. It will be assumed that the bidder has investigated and is aware of the conditions to be encountered in carrying out the proposed work, and is fully satisfied as to the scope, character, quality, quantity and requirements of the proposed work, and the submission of a bid will be an acknowledgement of that assumption.

The bidder shall receive no additional compensation for obstacles or difficulties due to surface or subsurface conditions actually encountered. Where investigations of surface or subsurface conditions have been made by the City in respect to foundation or other structural design, and that information is shown in the plans, said information is included only for the convenience of bidders. The City assumes no responsibility whatsoever as to the sufficiency or accuracy of borings, or of the log of test borings or other investigations or tests, or of the interpretation thereof; there is no guaranty, warranty or representation, express or implied, that the conditions indicated thereby in fact exist or are representative of those existing throughout the work. Such information shall be used as a basis for bids at the bidder's own and sole risk; making such information available to bidders is not to be construed in any way as a waiver of the other provisions of this paragraph, and bidders must satisfy themselves through their own investigation as to the surface and subsurface conditions to be encountered at the site. By submitting a Proposal, the Bidder has certified that he has examined all items indicated in Section 2.07, "Examination of Plans, Specifications, and Site of the Work."
Each proposal shall be enclosed in a sealed envelope and endorsed as specified in the Notice Invited Sealed Proposals. Bidders are warned the proposals containing irregularities of any kind, including erasures, omissions, conditions, alterations, or additional proposals may be rejected.

2.08 Withdrawals of Proposals - Any proposal may be withdrawn at any time prior to the time fixed in the Notice Inviting Sealed Proposals for the opening of bids, provided that a request in writing, executed by the bidder or his duly authorized representative, for the withdrawal of such bid, is filed with the City. The withdrawal will not prejudice the right of a bidder to file a new proposal.

2.09 Proposal Guaranty - Each proposal shall be accompanied by either a certified check, cashier's check, or bidder's bond of a surety company acceptable to the City in an amount not less than ten percent (10%) of the bid amount, and shall be made payable to the City.

2.10 Disqualification of Bidders - More than one proposal from an individual, firm or partnership, a corporation, or an association under the same or different names will not be considered. Reasonable grounds for believing that any bidder is interested in more than one proposal for the work will be the cause of the rejection of all proposals in which such bidder is interested. If there is a reason to believe that collusion exists among the bidders, none of the participants in such collusion will be considered. Proposals in which the prices obviously are unbalanced may be rejected.

2.11 Bid Protest Procedures – Any protest of the proposed contract award shall be submitted in writing to the City Clerk no later than 5:00 p.m. on the fifth (5 th) business day following the date of the bid

8.k
February 27, 2023

Packet Pg. 295

General Provisions 2023 Sewer System Root Foaming Project Page P-8 Project No. C1752-23
opening. If the fifth day falls on a weekend or holiday, the last day of the protest period shall be the first working day following the fifth day.

The protest must include the name, address, and telephone number of the person representing the protesting party. In addition,
(a) The party filing the protest must have submitted a bid for the Project. A Subcontractor of a party filing a bid for the project may not submit a bid protest. (b) The protest must contain a complete statement of the basis for the protest, and refer to the specific portion of the Contract Documents or the specific statute that forms the basis for the protest.
(c) The party filing the protest must concurrently transmit a copy of the protest to the proposed awardee.

Any bidder’s failure to fully comply with these procedures shall constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings.

The City shall review all timely protests prior to the award of contract. The City shall not be required to hold an administrative hearing to consider any protests, but may do so at its option. The City Council or the City Manager as designee if the authority to award the contract has already been granted by the City Council, may either reject the protest and award the project to the lowest responsible bidder or accept the protest and award the project to the next lowest responsible bidder. Nothing in this section shall be construed as a waiver of the City Council’s right to reject all bids.

2.12 List of Subcontractors - In accordance with the provisions of Section 4104 of the Public Contract Code, each proposal shall list the name, address and license number of each subcontractor to whom the bidder proposes to sublet portions of the work. A subcontractor is defined as one who contracts with the contractor to furnish materials and labor, or labor only, for performance of work. Subcontractors shall be listed on the form provided in the Bid Proposal.

2.13 Required Contractor and Subcontractor Registration - In accordance with Labor Code Section 1725.5 and 1771.1, the contractor and all subcontractors shall be registered with the California Department of Industrial Relations (DIR) prior to the bid opening. All 2nd and lower tier subcontractors working on the project shall be registered with the Department of Industrial Relations prior to the work being performed. An inadvertent error in listing a subcontractor who is not registered may not be grounds for considering the bid non-responsive providing that any of the provision in Labor Code Section 1771.1(c) are satisfied.

8.k
February 27, 2023

Packet Pg. 296

General Provisions 2023 Sewer System Root Foaming Project Page P-9 Project No. C1752-23
SECTION 3: REVIEW OF BIDS, CONTRACT AWARD AND EXECUTION

3.01 Public Bid Opening and Initial Review - Bids which have been submitted in accordance with the requirements of the Bidding Documents, and which are received on or before the bid deadline will be opened publicly, and the dollar amounts of each bid shall be read aloud.

The City shall have the right to reject all bids. The City shall have the right to reject any bid not accompanied by the required bid security or any other item required by the Bidding Documents, or a bid which is in any other way incomplete or irregular. The City shall have the right to waive irregularities in a bid, and to award the Contract to the Lowest Responsible Bidder (as determined by the City), only if the irregularities are non-material and inconsequential.

3.02 Determination of Lowest Responsible Bidder - Criteria for determining low bid in all contracts with the City involving an expenditure of $5,000.00 or more shall be determined as the “Lowest Monetary Bidder” on the basis of the Engineer’s approximate estimate of the quantities of work to be done as set forth in the Bid Schedule, in accordance with the calculation criteria set forth on the bid.

After the Lowest Monetary Bidder has been determined, the Engineer shall review that Bidder’s bid in order to determine whether or not that Bidder is the “Lowest Responsible Bidder.” The term Lowest Responsible Bidder shall mean the Lowest Monetary Bidder whose bid is responsive, and who is responsible to perform the work, as required by the Contract Documents.

The term “responsive” is defined by California law, but generally means that the bid has been prepared and submitted in accordance with the Bidding Requirements. The term “responsible” is defined by California law, but generally means that the Bidder is able to demonstrate that it possesses: (1) the capacity to perform the work required by the Contract Documents with respect to financial strength, resources available, and experience; and (2) the integrity and trustworthiness to complete performance of the work in accordance with the Contract Documents.

The City will make its determination of responsibility based upon information submitted by Bidders contained in the Bidders Qualifications and Bidders References included in the Bid Forms and, if necessary, through interviews with previous cities, clients, design professionals, or subcontractors with whom the Bidder has worked. In determining whether or not a Bidder is responsible, the City may consider the following factors in relation to the work to be performed for this Project:
(a) Demonstrated financial strength including, but not limited to, resources available, bonding capacity, and available insurance.
(b) Demonstrated safety record including, but not limited to, Experience Modification Rate. (c) Successful completion of projects of similar scope and size. In reviewing this factor, the City may consider elements including, but not limited to, contract amount of completed projects, experience on public works projects, experience implementing prevailing wage certified payroll requirements, timeliness of performance and, if necessary, evaluation of the Bidder’s work by previous cities, clients, design professionals, or subcontractors. (d) Sufficiency of contract administration and construction management systems including, but not limited to, proposed scheduling tools, proposed subcontract forms, proposed progress payment applications, and proposed certification of payroll documents. (e) History of claims, litigation, termination or disqualification from projects.

If the Engineer finds that the Lowest Monetary Bidder submitted a responsive Bid and that the Bidder is responsible, then that Bidder shall be deemed the apparent “Lowest Responsible Bidder,” and the Engineer shall report the findings to the City Council.

8.k
February 27, 2023

Packet Pg. 297

General Provisions 2023 Sewer System Root Foaming Project Page P-10 Project No. C1752-23
If the Engineer finds that the Lowest Monetary Bidder’s bid is not responsive, or that the Lowest Monetary Bidder is not responsible, then the Engineer may review the responsiveness and responsibility of the next Lowest Monetary Bidder. If the Engineer finds that the next Lowest Monetary Bidder is responsive and responsible, then that next lowest Bidder shall be deemed the apparent “Lowest Responsible Bidder,” and Engineer shall report its findings as recommendations to the City Council. This process may continue until the Engineer finds the Lowest Monetary Bidder which is also responsive and responsible.

In the event that one or more Low Monetary Bidders are found by the Engineer to be non- responsive or non-responsible, those Bidders will be given notice and a reasonable opportunity to present additional relevant evidence to the Engineer for consideration, within five (5) working days after the Bidder receives the notice.

All findings by the Engineer shall be reported as recommendations to the City Council. The City Council reserves the right to reject any or all Bids, and to waive any irregularity. No Bid shall be binding upon the City until after the Agreement is signed by both the Contractor and the City. If the City Council determines that it is in the City’s best interest to award the Agreement, a Notice of Award shall be sent to the Lowest Responsible Bidder as determined by the City Council. The City Council’s decision shall be final.

The City may investigate the responsibility and qualifications of all Bidders to whom the award is contemplated for a period not to exceed ninety (90) calendar days after the Bid opening, during which time no bid shall be withdrawn by the Bidders. The ninety (90) day review period may be extended upon the written request by the Engineer and written approval by the affected Bidder.

3.03 Notice of Award – Should the City decide to proceed with the award of contract the City shall issue a Notice of Award to the lowest responsible bidder.

3.04 Contract Execution - Within fifteen (15) calendar days after receipt of the Notice of Award, the bidder shall submit to the City two (2) originals of the signed agreement, the required contract bonds and certificates of insurance. If the bidder fails or refuses to enter into a contract to do the work, then the proposal guaranty accompanying the bid shall be forfeited to the City. After the Bidder has properly submitted these documents, the City will execute the Agreement and issue a Notice to Proceed.

3.05 Status of Contractor - The right of general supervision by the City shall not make the contractor an agent of the City, and the liability of the contractor for all damages to persons or to public or private property arising from the contractor's execution of the work shall not be lessened because of such general supervision.

3.06 Assignment - No agreement or portion thereof maybe assigned without consent of the Council, except that the Contractor may assign money due which will accrue to him under the Agreement.

If given written notice, such assignment will be recognized by the City to the extent permitted by law, but any assignment of money shall be subject to all proper setoffs and withholdings in favor of the City and to all deductions provided for in the Agreement. All money withheld, whether assigned or not, shall be subject to being used by the City for completion of the work, should the Contractor be in default.

Any attempt to assign or delegate the Agreement without the written consent of the City shall be void and of no force and effect. Consent by the City to one assignment shall not be deemed to be consent to any subsequent assignment.

3.07 Recognition of Subcontractors - No subcontractors will be recognized as such, and all persons engaged in the work of construction will be considered as employees of the contractor and their work shall be subject to the provisions of the contract, including specifically these general stipulations, the specifications and the contract drawings.

8.k
February 27, 2023

Packet Pg. 298

General Provisions 2023 Sewer System Root Foaming Project Page P-11 Project No. C1752-23

3.08 Return of Bid Security - Within ten (10) working days after the execution of the Agreement, the City will return the proposal guarantees accompanying the proposals that are not to be considered in making the award. All other proposal guarantees will be held until the Agreement has been fully executed, after which, they will be returned to the respective bidders whose proposals they accompanied.

3.09 Forfeiture of Proposal Guaranty - If Bidder does not properly execute the contract and submit the acceptable bonds, insurance and certifications within the specified time; this shall be just cause for the annulment of the award and the forfeiture of the proposal guaranty to the City. The City may then award the contract to next Lowest Responsible Bidder. The forfeited proposal guaranty may be utilized by the City in accordance with Public Contract Code, Sections 20170 through 20174.

3.10 Contract Bonds - Before execution of the contract by the City, the Contractor shall file with the City surety bonds satisfactory to the City in the amounts, and for the purposes, noted below. Said bond shall be on the form furnished by the City herein.
(a) Performance Bond - The contractor shall furnish and bear the cost of a bond of a surety company acceptable to the City, which bond is conditioned upon the faithful performance of all covenants and stipulations under this contract within the time prescribed, in a manner satisfactory to the City, and that all materials and workmanship will be free from original or developed defects. The amount of the bond shall be one hundred percent (100%) of the total contract price; as such sum is set forth in the agreement.

Said bond shall be on the form furnished by the City herein.

As a condition precedent to satisfactory completion of this contract, an amount equal to ten percent (10%) of the estimated contract cost shall hold good for the period specified in said bond after completion and acceptance of the work by the City. (b) Labor and Material Bond – The contractor shall furnish and bear the cost of a bond of a surety company acceptable to the City in the sum not less than one hundred percent (100%) of the total contract price, as such sum is set forth in the agreement, for the payment in full of all persons, companies, or corporations who perform labor upon or furnish materials to be used in the work under this contract, in accordance with the provisions of Section 4200 to 4208, inclusive (Chapter 3, Division 5), of the Government Code of the State of California, and any acts amendatory thereof. The bond shall be maintained by the Contractor in full force and effect until the work is accepted by the City and until all claims for materials and labor are paid.

Said bond shall be on the form furnished by the City herein. (c) Warranty Bond - The Contractor shall furnish a warranty bond in the amount of ten percent (10%) of the final contract price (total cost including change orders) to guaranty his work for two (2) years after acceptance of the work by the City Council.

Bonds shall be duly executed by a responsible corporate Surety, licensed and authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California. Each bond shall be signed by both the Contractor and Surety and the signature of the authorized agent of the Surety shall be notarized.

The Contractor shall pay all bond premiums, costs and incidentals. Should any bond become insufficient due to an increase in the contract amount, the Contractor shall obtain supplemental bonding within ten (10) days.

8.k
February 27, 2023

Packet Pg. 299

General Provisions 2023 Sewer System Root Foaming Project Page P-12 Project No. C1752-23
Should any Surety at any time be unsatisfactory to the City, notice will be given the Contractor to that effect. No further payments shall be deemed due or will be made under the Agreement until a new Surety shall qualify and be accepted by the City.

Changes in the work, or extensions of time, made pursuant to the Agreement, shall in no way release the Contractor or Surety from their obligations. The requirement for notifying the Surety of such changes or extensions shall be waived by the Surety.

3.11 Notification of Surety Companies - The surety companies shall familiarize themselves with all conditions and provisions of this contract and they waive the right of special notification of any change or modification of this contract or of extension of time, or of decreased or increased work, or of the cancellation of the contract, or of any other act(s) by the City or City's authorized agents, under the terms of this contract, and failure to so notify the aforesaid surety companies of changes shall in no wise relieve the surety companies of their obligation under this contract.

3.12 Power of Attorney - Attorneys-in-fact who sign bid bonds or contract bonds must file a certified and effectively dated copy of their Power of Attorney with each bond.

3.13 Insurance Requirements - Contractor shall provide at his own cost and expense from contract award date to acceptance of the work covered by the contract:
(a) Workmen's Compensation and Employer's Liability Insurance of not less than the amount shown in the Special Provisions for all of his employees to be engaged in the work under this contract. Should any such work be sublet, the contractor shall require each of his subcontractors at any tier similarly to provide Workmen's Compensation and Employer's Liability Insurance, all in strict compliance with Federal and State laws. (b) Personal Injury, Bodily Injury and Property Damage Liability Insurance (including automobiles, products and/or completed operations coverage) and Aircraft and Watercraft Bodily Injury Liability and Property Damage Liability Insurance if contractor uses owned or non-owned water aircraft in his operation, with Personal Injury and Bodily Injury (including death resulting therefrom) of not less than a combined Personal Injury and Property Damage Liability limit of not less than the amount shown in the Special Provisions. Should any work covered by the contract be sublet contractor shall require each of his subcontractors of any tier similarly to provide the aforesaid coverages. (c) All Risk (excluding Earthquake and Flood) Builder's Risk Insurance in an amount not less than the value of any work under this contract, except for buried pipelines and appurtenances which need not be included in the insurance value. Under the policies of insurance described above, each policy shall contain the provision for thirty (30) days written notice submitted by registered mail from the insurance carrier(s) to the City prior to cancellation or reduction in coverage.

3.14 Special Requirements - Under the policy of insurance described in Section 13.13-b, the policy shall contain the following provisions:
(a) The City and the City's officers, representatives, agents and employees shall be named as additional insureds.
(b) Endorsement providing that such insurance is primary insurance and no insurance of the additional insureds shall be called on to contribute to a loss. (c) Endorsement providing that such insurance shall not contain any exclusion regarding loss or damage to property caused by explosion or resulting from collapse of buildings or structures or damage to property underground, commonly referred to as "XCU" hazards. (d) Standard cross-liability clause covering personal injury, bodily injury (including death

8.k
February 27, 2023

Packet Pg. 300

General Provisions 2023 Sewer System Root Foaming Project Page P-13 Project No. C1752-23
resulting therefrom), and property damage.

3.15 Builders Risk Insurance - Under the policy of insurance, the policy shall contain the following provisions:
(a) The City shall be included as insured.
(b).. Losses shall be payable to the contractor and City as their interest may appear. (c).. Deductible amounts of all losses covered by insurance shall be borne by the contractor.

3.16 Certificates - Prior to beginning work, contractor shall furnish certificates satisfactory to the City as to contents and carriers of such insurance.

3.17 Legal Address of Contractor - Contractor's address as shown in the proposal, as well as such office or headquarters the contractor establishes at the site of work, hereby are designated as addresses to which drawings, samples, notices, letters, articles, or other communications to the contractor may be mailed or delivered. The delivery at either of these places of any item or communication from the City or agents thereof to the contractor shall be deemed sufficient service of such delivery. Contractor's address as shown in the proposal may be changed at any time by notice in writing from the contractor to the City. Nothing herein contained shall be deemed to preclude or render inoperative the service of any drawing, sample, notice, letter, or other article of communication to or upon the contractor personally.

3.18 Office of Contractor at Site - During the performance of the contract, Contractor shall maintain a suitable office at the site of work which shall be the headquarters of a representative authorized to receive drawings, instructions or other communications or articles from the City or City's agents; any such thing given to said representative or delivered at the contractor's office at the site of work in his absence shall be deemed to have been given to the contractor. Contractor shall maintain a complete set of plans and specifications at the site office whenever work is in progress.

8.k
February 27, 2023

Packet Pg. 301

General Provisions 2023 Sewer System Root Foaming Project Page P-14 Project No. C1752-23
SECTION 4 - SCOPE AND CONTROL OF WORK

4.01 Work to be Done – The work to be done consists of furnishing all labor, materials, tools, equipment and services necessary to complete the project, as further described in the Notice to Bidders of these Specifications, and as necessary to leave the site in a neat and finished condition with all equipment properly installed and working to the satisfaction of the Engineer.

While the City has endeavored to accurately represent in the plans and specifications the physical conditions which may affect the cost of the proposed work, the City does not warrant the completeness or accuracy of such information. It is the Contractor’s responsibility to ascertain the existence of any such conditions affecting the cost of the work, which would have been disclosed by reasonable examination of the site.

Conclusions pertaining to any test, investigation, statement or estimate of fact incorporated in the plans and specifications shall be considered by the Contractor to be a recommendation only. The Contractor may request equal access to the underlying or background information to arrive at his own opinion thereon, including his determination of how reliable might be any conclusion appearing in (or inferred from) the information. The Contractor may not rely upon “record drawings” or similar final or accepted drawings or maps constructed on public or private property. Such information may be used for reference only. Actual locations and depths shall be determined by field investigations by the Contractor.

No oral or telephonic agreement or conversation with any officer, agent, or employee of the City or the Engineer, either before or after execution of the contract, shall affect or modify any of the terms or obligations contained in any of the contract documents.

4.02 Plans and Specifications - It is the intent of the Plans and Specifications to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents.

For convenience, the Specifications are arranged in several sections, but such separation shall not be considered as the limits of the work required by any separate trade. The terms and conditions of such limitations are wholly between the Contractor and his subcontractors. In general, the Special Provisions, General Provisions, and other sections of the specifications indicate the responsibilities of the Contractor and the quality of material and methods of workmanship. The plans indicate dimensions, quantities, positions, and various other details of construction.

Any work, materials or equipment that may be reasonably inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for.

When words, which have a well-known technical or trade meaning, are used to describe the work, materials or equipment, such words shall be interpreted in accordance with that meaning. See General Provisions, Section 6.03, “Trade Names or Equals”.

Subheadings and titles printed on the drawings in these General Provisions, in the specifications, and elsewhere in the contract documents, are inserted for the convenience of reference only, and shall not be taken or considered as having any bearing on the interpretation thereof.

4.03 References to Standards and Codes - Reference to standard specifications, manuals or codes of any technical society, organization or association, or to the Laws or Regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or Laws or Regulations in effect at the time of the opening of bids (or, on the Effective Date of the Agreement if there were no bids), except as may be otherwise specifically stated.

However, no provisions of any referenced standard specifications, manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change the duties and responsibilities of City, Contractor or Engineer, or any of their consultants, agents or employees, from those set forth in the Contract Documents, nor shall it be effective to assign to the Engineer, or any of the Engineer’s Consultants, agents or employees, any duty or authority to supervise or direct the furnishing or performance of the work or any duty or authority to undertake responsibility for the Contractor.

8.k
February 27, 2023

Packet Pg. 302

General Provisions 2023 Sewer System Root Foaming Project Page P-15 Project No. C1752-23

4.04 Authority of the Engineer – The City has the final authority in all matters affecting the work.

Within the scope of the Agreement, the Engineer has the authority to enforce compliance with the Plans and Specifications and the Contractor shall promptly comply with instructions from the Engineer. The decision of the Engineer is final and binding on all questions relating to: quantities; acceptability of materials furnished and work performed; equipment; work execution, rate of progress or sequence of work; and interpretation of the Plans, Specifications, or other drawings. This shall be precedent to any payment under the Agreement, unless otherwise ordered by the City.

4.05 Contract Documents and Precedence - The Contract Documents consist of the documents listed below, in order of precedence. If there is a conflict between component parts of the Contract Documents, the document highest in precedence controls. (a) Change Orders.
(b) Project Directives.
(c) Permits issued by other agencies.
(d) Permits issued by the City.
(e) Agreement and required agreement forms – Bid Bond, Faithful Performance and Labor and Materials Bonds, Warranty Bond, Insurance Endorsements, Worker’s Compensation Certification.
(f) Project Specifications, in the following order - Addenda, Bid Proposal including all Bid Proposal Forms, Notice Inviting Sealed Proposals, Special Provisions, Technical Provisions, Exhibits to the Proposal, and General Provisions. (g) Project Plans and Drawings.
(h) City Standard Specifications.
(i) City Standard Plans.
(j) Reference Specifications, in the following order – State of California Department of Transportation (Caltrans) State Standard Specifications (current edition), Standard Specifications for Public Works Construction “Greenbook”. (k) Reference Plans, in the following order – State of California Department of Transportation (Caltrans) State Standard Plans (2010 edition), Standard Plans for Public Works Construction (2010 edition).

All of the individual components of the Contract Documents are intended to be complementary and what is required by one shall be binding as if required by all. Interpretation of a disputed meaning or intent of the plans and specifications shall be made initially by the Engineer in accordance with the application of the order of precedence. Any final decision required regarding precedence and the clarification of discrepancies in the Contract Documents shall be made by the Engineer.

4.06 Interpretation of Specifications and Drawings - The specifications and the contract drawings are intended to be explanatory of each other. Any work indicated in the contract drawings and not in the specifications, or vice versa, is to be executed as if indicated in both. Should it appear that the work to be done, or any of the matters relative thereto are not sufficiently detailed or explained in these contract documents, including the contract drawings, the contractor shall apply in writing to the Engineer for such further explanations as may be necessary and shall conform thereto as part of this contract so far as may be consist with the terms of the contract. Should any doubt or question arise respecting the true meaning of the specification, the Engineer shall make the final decision.

4.07 Figured Dimensions - Figured dimensions on the contract drawings shall in all cases be given precedence over scaled dimensions. If figured dimensions do not correspond to scaled dimensions, contractor shall request Engineer to verify the accuracy of the figured dimensions. It shall be the responsibility of the contractor to ascertain the correct scale of all contract drawings in his possession,

8.k
February 27, 2023

Packet Pg. 303

General Provisions 2023 Sewer System Root Foaming Project Page P-16 Project No. C1752-23
including those which may have been reduced for reproduction.

4.08 Errors or Discrepancies - If the contractor, in the course of the work, discovers any discrepancies between the drawings and the conditions of the ground, or any errors or omissions in the drawings or in the layout given by stakes, points or instructions, it shall be his duty to inform the Engineer immediately in writing, and the Engineer shall promptly verify the same. Any work done after such discovery, until authorized, will be done at the contractor’s risk.

4.09 Drawings to be Furnished by Contractor - As soon as practical after the execution of this contract, the contractor shall supply drawings of devices to be furnished hereunder as are called for herein or as are required by the Engineer to make clear the details of construction and to demonstrate fully that all materials and equipment comply with the intent and provisions of this contract. Unless otherwise herein specified, such drawings shall be submitted to the Engineer for his review. Should the Engineer take exception with any drawings furnished by the contractor, the contractor shall make the revisions required, and resubmit them to the Engineer for review. After a satisfactory review by the Engineer, these drawings shall become a part of this contract and the work shall be done in conformity therewith. No such work shall be begun or devices purchased until the review of the drawings detailing such items have been completed.

The review of the drawings shall not relieve the contractor of responsibility, or waive or modify any of the provisions or requirements of this contract.

The Engineer's review of drawings submitted by the contractor will be for, and will cover, only generally conformity to the plans and specifications and will not constitute a blanket approval of all dimensions, quantities and details of the material or equipment shown by (nor shall review relieve the contractor of his responsibility for errors contained in) such drawings.

All shop drawings submitted by the various subcontractors which require review of the City's representative shall first be sent to the contractor who shall keep a record of the drawing numbers and the date of their receipt by him. Contractor shall submit the drawings to City's representative for review in time to prevent delays in delivery of materials.

Contractor shall thoroughly check all such shop drawings for measurements, size of member, materials and details to make sure they conform to the intent of the plans and specifications. Drawings found to be inaccurate or otherwise in error shall be returned by the contractor to the subcontractor for correction before they are submitted by the contractor to the City's representative for review.

4.10 Additional Drawings by City - Contract drawings are intended to be comprehensive and to indicate in detail the scope of the work. However, the Engineer may furnish the contractor additional drawings during the progress of the work in order to clarify and define in greater detail the intent of the contract drawings or specifications. Contractor may request such detailed drawings by submitting his request in writing to the Engineer at least two (2) weeks in advance of the time they are required.

4.11 Lines and Grades - All work under this contract shall be constructed to the lines, grades and elevations shown on the contract drawings. Contractor shall establish the lines, grades and elevations unless it is otherwise specified in the Special Provisions.

4.12 Record Documents – The Contractor shall keep at the worksite a record copy of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Work Directives, Field Orders and written interpretations and clarifications. These record documents together with all approved submittals, samples and shop drawings will be available to the Engineer as a reference at all times. Upon completion of the work, these record documents will be delivered to Engineer.

4.13 Record Drawings –The Contractor shall prepare and update a mas ter “as-built” set of red ink-lined plans, to be reviewed and approved by the Engineer at the end of every month. Drawings shal l contain information showing where actual installation differs from that shown on the original drawings, where underground or concealed features are found noting alignment (to 0.25’) and elevation (to 0.1’ ), field changes or deletions of work, and any additional work by change order. Upon the project’s completion, and prior to

8.k
February 27, 2023

Packet Pg. 304

General Provisions 2023 Sewer System Root Foaming Project Page P-17 Project No. C1752-23
the project’s acceptance, the Contractor shall submit to the City the completed as-built record Drawings on one (1) set of full size prints prepared on 22" x 34" paper.

Record Drawings are full size drawings (Plans) which marked up during construction to delineate the actual in-place constructed conditions. Record Drawings shall be provided by the Contractor for this Project. Requirements for Record Drawings as specified elsewhere shall supplement the requirements specified herein.

4.14 Reuse of Documents - Neither the Contractor nor any Subcontractor or supplier or other person or organization performing or furnishing any of the work under a direct or indirect agreement with the City shall have any title or rights to any of the Drawings, Specifications or other documents (or copies thereof) which bear the seal of the design engineer. Such documents shall not be reused on extensions of the project or for any other project without written consent of the City and the design engineer.

4.15 Subsurface Data – If completed, all soil and soil test data, water table elevations, and soil analyses included or referred to in the Contract Documents apply only at the location of the test holes and to the depths indicated. If completed, soil test reports for test holes which have been drilled are available for inspection at the office of the Engineer. Any additional subsurface exploration shall be done by Bidders or the Contractor at their own expense.

The elevation of the water table indicated by soil test reports is that which existed on the date the test hole was drilled. It is the Contractor’s responsibility to determine and allow for the possibility of differing ground water elevations on the date of the project’s construction. A difference in elevation between ground water shown in soil boring logs and ground water actually encountered during construction will not be considered as a basis for extra work.

4.16 Right-of-Way – Acquisition of right-of-way or permanent easements necessary for the improvements as shown on the plans will be provided by the City. Unless otherwise provided, the Contractor shall make his own arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas, easements, and temporary facilities required. Contractor shall identify and hold the City harmless from all claims for damages resulting from such actions.

4.17 Removal of Defective and Unauthorized Work - Should the Contractor deliberately proceed with any portion or phase of construction which is obviously incorrectly indicated in the contract plans or documents, he shall be responsible for any corrective measures required to make adequate repairs or adjustment. This shall include any work done beyond the lines and grades shown on the plans or established by the Engineer, or any extra work done without written authority.

All work that has been rejected shall be remedied or removed and replaced by the Contractor in an acceptable manner and no compensation will be allowed for such removal or replacement. If the Contractor fails to remedy rejected work within ten (10) working days after written demand, the City may, without prejudice to other remedies, sell such materials at auction or at private sale, or otherwise dispose of such material. The Contractor shall be entitled to the proceeds of such sale, if any, in excess of the costs and damages for which the Contractor is liable to the City, including reasonable attorneys’ fees and expenses and compensation for the City’s services and expenses.

4.18 Acceptance of Defective Work - The City shall have the option, at its sole discretion and by written notice to the Contractor, to accept defective work instead of requiring its removal or correction, in which case the contract sum shall be reduced by an amount equal to the difference between the value to the City such work would have were it complete, correct, and in conformity with the Contract Documents and the value to the City of such defective work. Such option shall be exercised solely by written notice to the Contractor and shall not be implied from any act or omission by the City or the Engineer. If the remaining payments and retention are insufficient to cover the amount of the reduction of the contract sum, the Contractor shall promptly pay to the City the amount of any such deficiency.

4.19 Submittals - Within ten (10) working days following the Notice to Proceed, the Contractor shall provide a detailed list for review and approval of all individual submittals required to be submitted

8.k
February 27, 2023

Packet Pg. 305

General Provisions 2023 Sewer System Root Foaming Project Page P-18 Project No. C1752-23
under the contract. The list shall reference the specification section and paragraph that requires the submittal along with the date the Contractor plans to transmit the submittal to the City for review.

Unless otherwise requested by the Engineer, submittals shall be provided electronically in .pdf format at least twenty-eight (28) calendar days prior to the approval being necessary for the work.

Submittals shall be transmitted with a Submittal Cover Letter form as approved by the Engineer. Large submittals consisting of reports, oversized or colored pages, full sized shop drawings, manuals contained in binders, or submittals in other forms not easily reproduced shall be provided in hard copy format with six (6) copies.

For items requiring shop drawings, no materials shall be furnished, and no work shall be performed, until the drawings have been favorably reviewed. Shop drawings shall be of a size and scale to clearly show all necessary details.

After review by the City of each of the Contractor's submittals, the material will be returned to the Contractor marked with actions defined as follows:
(a) NO EXCEPTIONS TAKEN - Accepted subject to its compatibility with future submissions and additional partial submissions for portions of the work not covered in this submission.

Does not constitute acceptance of deletion of specified or required items not shown in a partial submission.
(b) MAKE CORRECTIONS NOTED - The same as item (a), except that minor corrections as noted by the City shall be made by the Contractor. No resubmission is required. (c) REVISE AND RESUBMIT - Rejected because of major inconsistencies or errors which shall be resolved or corrected by the Contractor prior to subsequent review by the City. (d) REJECTED - Submitted material does not conform to plans and Specifications in major respects. This material is not expected to be resubmitted. (e) SUBMIT SPECIFIED ITEM - Submittals not reviewed by the City but received for record purposes.

Favorable review of the shop drawings by the Engineer is interpreted to mean that there is substantial and acceptable conformance with the contract plans, but details of design may not necessarily be checked for adequacy or accuracy. Such acceptance shall not relieve the Contractor from the responsibility for errors or omissions in the shop drawings or from deviations from the contract documents unless such errors, omissions, or deviations were specifically called to the attention of the Engineer in writing. The Contractor shall be responsible for the correctness of the shop drawings, for shop fits and field corrections, and for the results obtained by the use of such plans.

4.20 Substitutions – Proposed requests by the Contractor for changes in products, materials, equipment, and methods of construction required under the Contract Documents after the award of contract are considered "requests for substitutions.” For proposed “or equal” substitutions, attention is directed to General Provision Section 6.03, “Trade Names or Equals.” Each request for substitution shall be prepared and presented to the City in accordance with the procedures for submittals, except that the following additional information shall be provided. (a) An explanation of the advantages to the City for accepting the substitution. (b) A comparison of significant qualities of the proposed substitution with those specified. (c) A list of changes or modifications needed to other parts of the work and to construction performed by the City and separate Contractors, that will be necessary to accommodate the proposed substitution.
(d) A statement indicating the substitution's effect on the Construction Schedule compared to the Baseline Construction Schedule without acceptance of the substitution. Indicate the

8.k
February 27, 2023

Packet Pg. 306

General Provisions 2023 Sewer System Root Foaming Project Page P-19 Project No. C1752-23
effect of the proposed substitution on overall contract time. (e) Cost information, including a proposal of the net change, if any, in the Contract Sum. (f) Certification that the substitution is equal to or better in every respect to that required by Contract Documents, and that it will perform adequately in application indicated. Include Contractor's waiver of rights to additional payment or time extensions, that may be necessary because of the substitution's failure to perform adequately.

No extension of time will be allowed through failure of the Contractor to either transmit requests for substitution sufficiently in advance of the work, or on account of processing time outside the time limits noted.

4.21 Construction Staking Lines and Grades - Unless otherwise stated in the Special Provisions, the Contractor shall provide, preserve, and replace if necessary, all of the necessary construction stakes required for the construction of the project. Grades for underground conduits will be set on the ground surface and shall then be transferred to the bottom of the trench by the Contractor.

Stakes or marks will be set by a California Licensed Surveyor or a California Registered Civil Engineer to establish the lines and grades required for the completion of the work as specified in the Contract Documents. It shall be the Contractor's responsibility to notify the Engineer of any discrepancies found between field grades and notes shown within the Contract Documents.

Contractor shall furnish horizontal control and cut sheets to the Engineer immediately upon the setting of construction or boundary markers. Upon completion, all work shall conform to the lines, elevations, and grades shown on the plans.

4.22 Inspection of the Work - All work is subject to inspection and approval of the Engineer.

Unless otherwise stated in the specifications, the City shall perform all required inspections. The Contractor shall notify the Engineer before noon of the working day before inspection is required. Unless otherwise authorized, work shall be done only in the presence of the Engineer. Any work done without proper inspection will be subject to rejection. The Engineer shall at all times have access to the work during its construction at shops and yards as well as the project site. The Contractor shall provide every reasonable facility for ascertaining that the materials and workmanship are in accordance with the Contract Documents.

Inspection of the work shall not relieve the Contractor of the obligation to fulfill all conditions of the contract.

If a portion of the work is covered contrary to the Engineer’s request or direction, or contrary to the requirements of the Contract Documents, it must, if required in writing by the Engineer, be uncovered for the Engineer’s observation and be replaced at Contractor’s expense without adjustment of the contract time or the contract sum.

If a portion of the work has been covered, which is not required by the Contract Documents to be observed or inspected prior to it’s being covered and which the Engineer has not specifically requested to observe prior to it’s being covered, the Engineer may request to see such work and it shall be uncovered and replaced by Contractor. If such work is in accordance with the Contract Documents, the costs of uncovering and replacing the work shall be added to the contract sum by change order; and if the uncovering and replacing of the work extends the contract time, an appropriate adjustment of the contract time shall be made by change order. If such work is not in accordance with the Contract Documents, the Contractor shall pay such costs and shall not be entitled to an adjustment of the contract time or the contract sum.

Regular working hours for City Construction Inspectors are between 7:30 a.m. and 4:00 p.m., Monday through Friday, excluding City holidays. If the Contractor works outside these times, the Contractor may be charged for additional inspection. Inspection by the Engineer or by a City inspector, or any order measurement, approved modifications, certificate or payment of money, or acceptance of any part of whole of the work, or any extension of time, or any possession by the City or its agents, shall not operate as a waiver for any provision of this contract or of any power reserved therein to the City, or any right to damage

8.k
February 27, 2023

Packet Pg. 307

General Provisions 2023 Sewer System Root Foaming Project Page P-20 Project No. C1752-23
thereunder; no breach of this contract shall be held to a waiver of any or subsequent breach. All remedies shall be taken and construed as cumulative.

4.23 Testing - Unless otherwise stated in the Contract Documen ts, all required testing will either be performed directly by an independent laboratory coordinated and paid for by the Contractor. The Contractor shall submit the resulting certified tes t results and Certificates of Compliance for all ma terials requiring such as specified in the Technical Provision. Contractor shall cooperate with the City in coordinating the necessary testing. The coordination of testing, including the number and location of tests, shall be under the direction of the Engineer. All compaction test sites deeper than five (5’) feet below grade shall be properly shored by the Contractor to protect testing personnel.

The cost for performing re-tests due to failures, or additional call-outs if work is not ready to test, will be charged to the Contractor. The City shall require retesting until all required tests are successfully passed.

8.k
February 27, 2023

Packet Pg. 308

General Provisions 2023 Sewer System Root Foaming Project Page P-21 Project No. C1752-23
SECTION 5 – CHANGES IN WORK

5.01 Limited City Authority to Approve Change Orders - The Contractor recognizes that the City is a public agency and that it can only act through its duly authorized agents. In this regard, the Contractor agrees that only written change orders, executed by the governing body of the City, shall be valid. The Engineer shall have no authority to issue a change order unless so specifically authorized, and no person shall have authority to issue any oral change order.

5.02 Contractor Liability for Unapproved Change Orders - Unless a valid change order is issued, all changes in the work performed by the Contractor shall be at the Contractor’s own risk, and shall not be entitled to any additional compensation. Furthermore, the Contractor may be required to make the work conform to the plans and specifications. No act or series of acts by the City during the course of the contract shall be deemed to constitute a waiver of the City’s right to rely upon the provisions of this Section 5, “Changes in Work”.

5.03 Non-Material Change Requests by the Contractor - Changes in the plans and specifications requested in writing by the Contractor, which do not materially affect the work and which are not detrimental to the work or to the interests of the City, may be granted to facilitate the work, when approved in writing by the Engineer. If such changes are granted, they shall be made at a reduction in cost or at no additional cost to the City. Nothing herein shall be construed as granting a right to the Contractor to demand acceptance of such changes or to increase the contract sum or contract time as a result of the proposed change.

5.04 Effect of Extension of Time - The granting of any extension of time due to delays which, in the judgment of the City, are unavoidable delays shall in no way operate as a waiver on the part of the City of his rights under this contract.

5.05 Letters of Instruction - The Engineer may issue letters of instruction in the form of Field Orders, Clarifications, responses to Requests for Information, or any other document which makes interpretations or clarifications to the Contract Documents that do not modify the scope of work or involve an adjustment in the contract sum or contract time. Letters of Instruction shall be binding upon the Contractor, and the Contractor shall promptly carry out the requirements of such Letters of Instruction.

5.06 Requests for Information, Inconsistencies and Changed Conditions - Before undertaking each part of the work, the Contractor shall carefully study all pertinent figures shown in the Contract Documents and verify that all applicable field measurements are free of conflicts, errors, discrepancies, inconsistencies and omissions. If such conditions are discovered, the Contractor shall notify the Engineer by writing a Request for Information, and await direction from the Engineer before proceeding.

If the Contractor encounters a changed condition, as defined by one or more of the conditions below, the Contractor shall notify the Engineer by writing a Request for Information before disturbing the condition further.

(a) Material differing from that represented in the Contract which the Contractor believes may be hazardous waste, as defined by Health and Safety Code, Section 25117 that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provision of existing law; and
(b) Subsurface or latent physical conditions at the site differing materially from those represented in the Contract Documents; and
(c) Unknown physical conditions at the site of any unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in the work and of the character provided for in the Contract Documents.

8.k
February 27, 2023

Packet Pg. 309

General Provisions 2023 Sewer System Root Foaming Project Page P-22 Project No. C1752-23
No extension of Contract time shall be made by the City due to the Contractor’s failure to provide a timely written notice of any inconsistency or changed condition requiring direction. The Engineer will respond to the Contractor’s Request for Information within three working days, providing an interpretation, clarification or change order for an appropriate adjustment in contract time and cost pursuant to General Provisions, Section 5.07, and “Change Orders”. Contractor shall wait for the Engineer’s written response to a Request for Information before proceeding with any work.

The Contractor shall not be liable to the City for failure to report any conflict, error, or discrepancy in the Contract Documents, unless the Contractor had actual knowledge or could foresee such conditions as may be discovered by a reasonable examination of the work site or materials. If the Contractor performs any construction activity in which he knows or should know involves an error, inconsistency, ambiguity, or omission referred to in this Section, without notifying and obtaining the written consent of the Engineer, Contractor shall be responsible for the resultant costs, including, without limitation, the costs of correcting defective work. However, in an emergency affecting the safety of persons or property, the Contractor shall take all reasonably necessary precautions to prevent or minimize damage, injury, or loss.

5.07 Extra and Omitted Work - Whenever corrections, alterations or modifications of the work under this contract are ordered and approved by the Engineer and increase the amount of work to be done, such added work shall be known as Extra Work. When such corrections, alterations or modifications decrease the amount of work to be done, such deleted work shall be known as Omitted Work. The General and Special Provisions shall apply with equal force to all extra and omitted work.

When the Contractor considers that any changes ordered involve extra or omitted work, he shall immediately notify the Engineer in writing and subsequently keep him informed as to when and where the alleged extra work is to be performed.

When extra work reports are agreed upon and signed by both parties, they shall become the basis of payment. When extra work is still under negotiation or has not been agreed upon, the Contractor shall keep daily detailed and accurate records itemizing each element of cost and shall provide certified payroll, invoices, and other substantiating records and documentation with records and/or claims for compensation to be provided no later than 30 days following the time in which the work claiming to be extra was performed.

Unless notification of extra work is documented, and unless a complete statement of materials used and expenses incurred is furnished by the Contractor, the Contractor shall not be entitled to payment of such alleged extra work, and any future claims for compensation will be invalid.

Payment for extra work shall be in accordance with General Provisions, Section 5.08 - “Change Orders”. Omitted work shall not constitute a claim for damages on account of anticipated profits on the work that may be omitted.

5.08 Change Orders – At any time during the progress of the work, and without in any way rendering void the Agreement, the City may order alterations, additions or deductions from the work by change order, without notice to sureties. When so ordered in writing, the Contractor shall proceed with work as directed by the change order.

The change order shall describe the change in the work, the adjustment of the contract sum (if any), and the adjustment of the contract time (if any). The Contractor shall not be entitled to any extension of time for the completion of the work by virtue of any change order unless the change order specifically provides for this. If, after receiving a change order, the Contractor feels that he is entitled to an extension of time, he may, within five (5) working days file a written claim to that effect for consideration by the Engineer.

The process of submitting a proposed change, a cost proposal, or negotiating an agreed upon change order, or any failure to reach an agreement as to an adjustment in the contract sum or the contract time, shall not relieve the Contractor of his obligation to perform in accordance with the Contract Documents.

8.k
February 27, 2023

Packet Pg. 310

General Provisions 2023 Sewer System Root Foaming Project Page P-23 Project No. C1752-23
A change order may be in the form of a City directed change order or an agreed upon change order. Upon the receipt of either form of change order, the Contractor shall proceed promptly and diligently with the extra work.
(a) City Directed Change Orders - A City directed change order may be issued by the City without the Contractor’s signature where the City determines that it is in the City’s best interest to proceed with the work, and the change does not materially alter the character of the work. The Contractor shall be deemed to have accepted the terms of any City directed change order unless the Contractor asserts a claim with respect to the change order, no later than ten (10) working days following the Contractor’s receipt of the change order. See General Provisions, Section 5.09`, “Disputed Work”.
(b) Agreed Upon Change Orders - Within five (5) working days after receiving a request from the City for a written proposal for an agreed upon Change Order, the Contractor shall provide the Engineer with a cost proposal in a form satisfactory to the Engineer, setting forth the Contractor’s proposed adjustments to the contract sum and contract time for performing the extra work.

Compensation for agreed upon change orders shall be calculated based upon the unit prices stated in the Bid Schedule and no additional markup for overhead or profit will be provided unless stated otherwise as follows. If there are no unit prices for the extra work, the Contractor and the City may agree upon unit prices or lump sum costs, which shall be used to increase or decrease the contract sum. In the absence of any such agreement, the contract sum shall be adjusted by Force Account.

1. Quantity Adjustments - Unit prices shall govern not only for alterations to work covered by written specifications and drawings, but also for other work incidental or necessary to completing the work for which written specifications and drawings may be later prepared. Whenever an item of work or materials is specified in the contract by unit price and is increased or decreased by more than 25 percent (25%), Section 9-1.06 of the Standard Specifications shall govern payment. This Section allows for a renegotiation of the unit price based upon consideration of the total pay item cost. If, however, a renegotiated price cannot be reached by the Contractor and the City, then the payment for this item shall be adjusted by Force Account.

2. Agreed Upon Price – If there are no unit prices for proposed extra work, the Contractor and the City may agree upon unit prices or lump sum costs, by written change order, prior to commencing work. In the absence of any such agreement, the contract sum shall be adjusted by Force Account.

3. Force Account - When extra work is to be paid on a force account basis, the labor, materials and equipment used in the performance of that work shall be paid in accordance with the 2010 State Standard Specification, Section 9-1.04 “Force Account.” To the total of the direct costs computed, there can be an added markup of up to thirty-five percent (35%) to the cost of labor, up to fifteen-percent (15%) to the cost of materials and up to fifteen-percent (15%) to the cost of equipment.

These markups shall constitute full compensation for any and all overhead costs, profit, or other costs not specifically designated as a cost of labor, material or equipment. When subcontractors perform force account work, an additional ten- percent (10%) markup shall be added to the total cost of the extra work to reimburse the Contractor for additional administrative costs. No markup for any Subcontractor beyond the first tier shall be paid.

During the performance of extra work by Force Account, and as a condition to the Contractor’s right to an adjustment of the contract sum, the Contractor shall prepare daily reports itemizing all costs for labor, materials, and equipment rental and provide certified payrolls. For labor costs, the reports shall include names, job classifications, hours worked and rates of pay. For equipment costs, the reports shall include size, type, identification number and hours of operation. All records

8.k
February 27, 2023

Packet Pg. 311

General Provisions 2023 Sewer System Root Foaming Project Page P-24 Project No. C1752-23
and reports shall be submitted to the Engineer for approval on a daily basis.

Reports shall be made on the State of California, Daily Extra Work Report Form or on a similar form approved by the Engineer.
i. Labor - Labor costs shall be based on the prevailing wage scale for each craft or type of workman, and no compensation shall be allowed for payment in excess of the prevailing wage. Employer payments for payroll taxes and insurance, health and welfare, pension, vacation, and other direct labor costs shall be included and will be calculated as the Labor Surcharge stipulated in the State of California, Labor Surcharge and Equipment Rental Rates book.
ii. Materials - Materials cost shall be the cost of all materials purchased by the Contractor and used in the extra work and shall be the actual cost of such materials, including sales taxes, freight and delivery charges. The City reserves the right to reject materials to be furnished by the Contractor, sources of supply or, if necessary, to furnish the materials to the Contractor. No compensation will be paid to the Contractor for any material furnished by the City or for materials not used. iii. Equipment Rental - The Contractor will be allowed the actual rental rate of equipment, prorated over the time the machinery or equipment is required.

For Contractor owned equipment, this rate shall be as stipulated in the State of California, Labor Surcharge and Equipment Rental Rates book.

In addition, the Contractor will be allowed reasonable move-in and move- out charges, if applicable. All equipment shall, in the opinion of the Engineer, be in good working order, good condition, and suitable for its purpose. Equipment or tools having a replacement value of $200.00 or less, whether or not consumed by use, shall be considered small tools and no payment will be made therefore.
iv. Other Services or Expenditures - The City may authorize and approve payment for work performed by special forces or necessary services and expenditures other than labor, materials, and equipment rental.

5.09 Disputed Work - When the Engineer and Contractor fail to agree as to whether an alteration ordered by the Engineer constitutes a material change or difference in the character of the work, or fail to agree upon the compensation to be allowed for such altered work, the Contractor shall proceed with the altered work and file with the Engineer, within ten (10) working days after receiving direction from the Engineer, a written protest detailing the particulars of the dispute and the amount of additional compensation or time required for the alteration. Failure of the Engineer to recognize a change in the character of work when ordering alterations shall in no way be construed as relieving the Contractor of the Contractor’s duty and responsibility for filing a protest as prescribed above. The City will not consider additional compensation for altered work unless the Contractor files a written protest within ten (10) working days after receiving direction from the Engineer.

If the Contractor has complied with the notification requirements of this sub-section, consideration of payment due shall be made as later determined through claim resolution procedures as set forth in General Provisions, Section 10, “Measurement and Payment”.

Although not to be considered as approval for proceeding under extra work provisions, the Contractor shall keep and furnish records of disputed work in accordance with General Provisions, Section

5.07, “Extra Work”.

8.k
February 27, 2023

Packet Pg. 312

General Provisions 2023 Sewer System Root Foaming Project Page P-25 Project No. C1752-23
SECTION 6 - CONTROL OF MATERIALS

6.01 Materials and Workmanship - All materials, parts and equipment furnished by the Contractor in the work shall be new, high grade, and free from defects. Workmanship shall be in accordance with generally accepted standards. Materials and workmanship shall be subject to the Engineer’s approval.

Materials and workmanship not conforming to the requirements of these specifications shall be considered defective and will be subject to rejection. Defective work or material, whether in place or not, shall be removed immediately from the site by the Contractor, at his expense, when so directed by the Engineer.

If the Contractor fails to replace any defective or damaged work or material after notice from the Engineer, the Engineer may cause such work or materials to be replaced. The replacement expense shall be deducted from the amount to be paid to the Contractor.

Used or secondhand materials, parts and equipment are permissible only if permitted by the Special Provisions.

Specialized material or equipment to be used in the work that is not readily available from material suppliers (such as electroliers, luminaries, signal poles, heads, cable, controllers, pumps, etc.) shall be ordered within five (5) days after award of the contract. Time extensions will not be granted for project delays due to the unavailability of such specialized material and equipment unless the Contractor furnishes the Engineer with documentation of purchase order dates, acceptable reason for delay of delivery, or proof of diligent efforts to obtain said items from alternate sources.

The Contractor shall provide the Engineer with periodic reports to inform the Engineer of any changes in the projected material or equipment delivery dates.

6.02 Protection of Work and Materials - The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the work. Stored materials shall be reasonably accessible for inspection. The Contractor shall also adequately protect new and existing work and equipment for the duration of his contract.

The Contractor shall not, without the City’s consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the contract.

6.03 Trade Names or Equals – In accordance with Public Contract Code Section 3400, whenever any particular material, process, or equipment is indicated by patent, proprietary or brand name, or by the name of a manufacturer or supplier, such wording is used for the purpose of facilitating its description and shall be deemed to be followed by the words “or equal”.

Because products specified may have a uniqueness that can’t be matched, the Contractor must “bid” the work based upon the products specified. If, during the submittal process, an equivalent product is proposed by the contractor, the contractor shall provide data to show that the product is considered equal.

Contractor shall also identify any price differences, which shall be considered as part of the substitution and if accepted, shall result in an appropriate credit or cost to the City by change order should the substitution be made.

Unless otherwise authorized by the Engineer, the proposed substitution must be submitted in sufficient time, before the normal use or installation of the material, process or equipment, for the Engineer to determine the equivalency and for the Contractor to make any required purchases (including delivery).

8.k
February 27, 2023

Packet Pg. 313

General Provisions 2023 Sewer System Root Foaming Project Page P-26 Project No. C1752-23
The Engineer shall be responsible for solely determining whether the material proposed for substitution is equivalent to that specified, and the Engineer’s findings shall be final. If a substitute offered by the Contractor is found to be not equal to the specified material, the Contractor shall furnish and install the specified material.

The specified contract completion time shall not be affected by any circumstances developing from the provisions of this Section.

6.04 Inspection of Materials by City - Unless otherwise specified, inspection may be required at the source for such typical materials and fabricated items as bituminous paving mixtures, structural concrete, metal fabrication, metal casting, welding, concrete pipe manufacture, protective coating application, and similar shop or plant operations.

Standard items of equipment such as electric motors, conveyers, elevators, plumbing fixtures, etc., are subject to inspection at the job site. Special items of equipment such as designed electrical panel boards, large pumps, sewage plant equipment, etc., are subject to inspection at the source, normally only for performance testing. The Special Provisions may specify additional inspection requirements.

6.05 Inspection of Materials by Others - When the City does not elect to make its own inspection at the source, the City may, at its expense, engage an inspector or accredited testing laboratory to inspect the materials, equipment or process. The inspector or representative of the testing laboratory shall judge the materials by the requirements of the plans and specifications. No materials or equipment shall be shipped nor any processing, fabrication or treatment of such materials shall be done without a favorable inspection by the engaged agent. These materials shall be subject to re-inspection at the job-site.

6.06 Tests of Materials - Before incorporation into the work, the Contractor shall submit samples of materials, as the Engineer may require, at no cost to the City. The Contractor, at his own expense, shall deliver the materials for testing to the place, and at the time designated, by the Engineer. Unless otherwise provided by the Special Provisions, all testing shall be performed under the direction of the Engineer, and at no expense to the Contractor.

The Contractor shall notify the City in writing at least fifteen (15) days in advance of his intention to use materials for which tests are specified, to allow sufficient time for the City to perform the tests. The notice shall name the proposed supplier and source of material.

6.07 Certification – The Engineer may waive material testing requirements of the Specifications and accept the manufacturer’s written Certificate of Compliance or test data demonstrating that the materials to be supplied meet the requirements of the specifications. A Certificate of Compliance is acceptable for authorizing the use of steel pipe in sizes less than eighteen (18) inches and vitrified clay, cast iron or ductile iron pipe in all sizes. All materials used on the basis of a Certificate of Compliance may be sampled or tested by the City at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of the responsibility for incorporating materials in the work which conforms to the requirements of the Contract Documents.

6.08 Weighing and Metering Equipment – All scales and metering equipment used for proportioning materials shall be inspected for accuracy and certified within the past twelve (12) months by the State of California Bureau of Weights and Measures, by the County Director or Sealer of Weights and Measures, or by a scale mechanic registered with or licensed by the County, The accuracy of the work by a scale service agency, except as stated herein, shall meet the standards of the California Business and Professions Code and the California Code of Regulations pertaining to weighing devices. A certificate of compliance shall be presented to the Engineer for approval prior to operation, and shall be renewed whenever required by the Engineer at no cost to the City.

All scales shall be arranged so they may be read easily from the operator’s platform or area. They shall indicate the true net weight without the application of any factor. The figures of the scales shall be clearly legible. Scales shall be accurate to within one-percent (1%) when tested with the plant shut down.

8.k
February 27, 2023

Packet Pg. 314

General Provisions 2023 Sewer System Root Foaming Project Page P-27 Project No. C1752-23
Weighing equipment shall be so insulated against vibration or moving of other operating equipment in the plant area such that the error in weighing with the entire plant running will not exceed two-percent (2%) for any setting nor one and one half percent (1.5%) for any batch.

6.09 Calibration of Testing Equipment – Testing equipment, such as but not limited to, pressure gages, metering devices, hydraulic systems, force (load) measuring instruments, and strain-measuring devices shall be calibrated by a testing agency acceptable to the Engineer at intervals not to exceed twelve (12) months, and following repairs, modification, or relocation of the equipment. Calibration certificates shall be provided when requested by the Engineer.

8.k
February 27, 2023

Packet Pg. 315

General Provisions 2023 Sewer System Root Foaming Project Page P-28 Project No. C1752-23
SECTION 7 – UTILITIES

7.01 City’s Statutory Obligation - Pursuant to Government Code, Section 4215: “in any contract to which a public agency as defined in Section 4401 is a party, the public agency shall assume the responsibility, between the parties to the contract, for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the site of any construction project that is the subject of the contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids. The contract documents shall include provisions to compensate the Contractor for the costs of location, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy and for equipment on the project necessarily idled during such work. The Contract documents shall include provisions that the Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the public agency or the owner of the utility to provide for removal or relocation of such utility facilities.”

7.02 Contractor’s Obligation to Identify and Protect Subsurface Infrastructure - The Contractor shall locate and protect service laterals, conduits, and appurtenances of any underground facility, the presence of which could be reasonably inferred from the Contract Documents or from the presence of visible facilities such as buildings, meters, and junction boxes, prior to doing any work that may damage any such facilities, or interfere with their service. Where underground main distribution conduits, such as water, gas, sewer, electric power, telephone, or cable television are shown on the plans, the Contractor shall assume that every parcel will be served by a service connection for each type of utility. The Contractor shall comply with all requirements for the protection of underground infrastructure as set forth in Government Code, Sections 4215 through 4216.9.

It shall be the Contractor’s responsibility to complete all work in a manner that satisfies utility company standards, providing if requested, detailed plans prepared by a California Registered Civil Engineer showing necessary temporary support of utilities during coordinated construction work. The Contractor is directed to contact these agencies before submitting bids and to be familiar with their requirements and shall include all costs of this coordination within the proposals bid prices.

The Contractor agrees to assume liability and to hold the City of San Carlos, its officers, and employees harmless from any damages resulting from the existence of underground utilities and structures not reported to the Engineer, not indicated on the public records examined, or located at variance with that reported or shown on records examined.

7.03 Location - The City will search known records and indicate on the plans those utilities, except service connections, which may affect the work. All available information regarding removal, relocation, or disconnection of utilities, or installation of new utilities, will be furnished to prospective bidders before the receipt of bids. The Contractor shall immediately report to the Engineer those utilities omitted from the plans or found substantially at variance with the location shown.

Existing and proposed utilities and improvements are shown in their approximate locations. Locations may not have been field verified and no guarantee i s made as to the accuracy and completeness of the information shown. The fact that any facility is not shown on the plans shall not relieve the Contractor of his responsibility under this Section. It shall be the Contractor’s responsibility to determine the existence and location of utilities shown on the plans, indicated by field locating services, or evidenced by facilities visible in the field. No additional compensation will be allowed for delays incurred as a result of the Contractor’s failure to field verify and/or pothole existing utilities prior to beginning construction. Potholing shall be considered as part of the various contract bid items and no additional compensation will be allowed.

At least three (3) working days prior to commencing work, the Contractor shall request that utility and agencies mark or otherwise indicate the location of their substructures. Contractor shall contact Underground Service Alert (USA) at (800) 642-2444 and the Engineer at least forty-eight (48) hours prior to excavation. The location of utilities as shown on the plans are approximate and are not to be construed

8.k
February 27, 2023

Packet Pg. 316

General Provisions 2023 Sewer System Root Foaming Project Page P-29 Project No. C1752-23
as certainty. It shall be the Contractor’s responsibility to determine the true location and depth of all utilities and service connections affecting or conflicting with the work, prior to the performance of the work. As necessary, the Contractor shall pothole these utilities prior to working in the area to avoid damage to them.

Potholing shall be considered as part of the contra ct bid items, and no separate payment will be made.

Contractor shall familiarize himself with the type, material, age and condition of any utility which may be affected by the work.

7.04 Protection - As necessary or as directed by the Engineer, the Contractor shall field adjust proposed improvements to avoid conflicts with existing improvements. The Contractor shall not interrupt the service function or disturb the supporting base of any utility, without authority from the utility Owner or order from the City.

Where protection is required to ensure support of existing underground, overhead and at-grade utilities (including their associated structures and service connections) as shown on the plans, the Contractor shall furnish and place the necessary protection at his expense. In case of damage, the Contractor, without additional compensation, shall restore utilities to as good of a condition as they were found.

Upon learning of the existence and location of any utility omitted from or shown incorrectly on the plans, the Contractor shall notify the City and be fully responsible for protecting such utility. When authorized by the Engineer, additional protection may be paid by change order, for utilities other than a service connection.

The Contractor shall immediately notify the Engineer and the utility owner if he disturbs, disconnects or damages any utility. If the utility is located substantially as indicated on the plans, the Contractor shall bear the costs of repair or replacement.

When placing concrete around or contiguous to any utility, the Contractor shall at his expense, furnish and install a cushion of expansion joint material, clear opening, sleeve, or other suitable material approved by the Engineer so as to prevent embedment or bonding of the utility with the concrete.

7.05 Shut Down Notification – The City is in-charge of the sewer and storm water collecti on systems, traffic signals and street lighting system and as such the Contractor shall coordinate shut downs of these utilities and facilities with the City’s Engi neer and Public Works Maintenance Department. The Contractor shall also coordinate the shutdown of all other utilities, including, but not limited to water, electricity, gas, communications, or CATV with the corresponding utility owner.

Shut downs of any utility or other facility, when allowed, shall be done only after:

A. The Contractor has coordinated with and notify the Engineer/Utility Owner s in writing, at least seventy-two (72) hours in advance of the shut down, and, B. Has properly notified customers (residents, businesses/agencies) emergency response staff, and, C. Has all materials required for the work at the job site prior to requesting a shut off.

Except for scheduled shutdowns and in cases of emergency, the Contractor shall notify all customers and effected parties of a shutdown at least forty-eight (48) hours in advance by writing and four (4) hours in advance by person to allow adequate draw time. Once shut down, the Contractor shall proceed with the work in an expedient manner until the water lines or sewer lines are back in service.

7.06 Removal - Unless otherwise specified, the Contractor shall remove all portions of interfering utilities shown on the plans as ‘abandoned’ or “to be abandoned in place”. Before starting removal operations, the Contractor shall ascertain from the utility Owner whether abandonment is complete.

The costs involved in the removal and disposal of utilities to be abandoned shall be considered as part of the contract bid items, and no separate payment will be made.

7.07 Relocation - When feasible, the utilities within the area affected by the work will complete their necessary installations, relocations, repairs, or replacements before commencement of work by the Contractor. When the Contract Documents or plans indicate that a utility is to be relocated, altered or

8.k
February 27, 2023

Packet Pg. 317

General Provisions 2023 Sewer System Root Foaming Project Page P-30 Project No. C1752-23
constructed by others, the City will conduct all negotiations with the utilities and the work will be done at no cost to the Contractor.

Utilities interfering with the permanent project work, discovered after the award of the contract, shall either be relocated, altered, or reconstructed by the utility, or the Engineer may order changes in the work to avoid interference. Such changes will be paid for in accordance with General Provisions, Section 5, “Changes in Work”.

When the plans or specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such work shall be absorbed in the contract bid items. Temporary or permanent relocation or alteration of utilities by the Contractor for his own convenience shall be his responsibility, and he shall make all arrangements, obtain all approvals, and bear all costs. The Contractor may, for his own convenience or to expedite the work, agree with the owner of any utility to disconnect and reconnect interfering service connections. The City shall not be involved in any such agreement.

7.08 Delays - The Contractor is responsible for notifying utility companies in time to prevent delays attributable to utility relocations or alterations as called for in the Contract Documents. The Contractor shall not be entitled to damages or additional payment if such delay does occur. The Engineer will determine the extent of the delay based on the Baseline Construction Schedule (Section 8.05) and on the project as a whole, and any commensurate extension of time.

7.09 Cooperation - When necessary, the Contractor shall conduct his operations so as to permit access to the worksite and provide time for utility work to be accomplished during the progress of the contract work.

8.k
February 27, 2023

Packet Pg. 318

General Provisions 2023 Sewer System Root Foaming Project Page P-31 Project No. C1752-23
SECTION 8 – PROSECUTION AND PROGRESS

8.01 Notice to Proceed - Within twenty-one (21) calendar days following receipt of the signed agreement, bonds and insurance, the City shall issue the Contractor a Notice to Proceed provided that the documents are acceptable to the City. Unless stated otherwise, the contract time shall commence upon the receipt date on the Notice to Proceed.

8.02 Commencement of Work - Work shall commence within fifteen (15) calendar days following the receipt date on the Notice to Proceed, and shall be diligently prosecuted to completion within the time provided in the Notice to Bidders.

8.03 Subcontracting - Unless otherwise indicated by the Special Provisions, the Contractor shall perform the majority of the project work.

8.04 Administrative Duties - The Contractor shall coordinate the scheduling and timing of administrative duties with other activities to avoid conflicts and to ensure orderly project progress. Such activities include, but shall not be limited to, the preparation of construction schedules, preparation and processing of submittals, requests for information and responding to requests for quotations, attending and preparing for progress meetings and coordinating project closeout activities.

8.05 Baseline Construction Schedule – Within ten (10) calendar days of the Notice to Proceed, the Contractor shall submit to the Engineer an acceptable Critical Path Method (CPM) progress schedule showing the critical path for completing the various items of work within the number of contract days specified. The schedule shall show the order in which the Contractor proposes to carry out the major items of work and the dates on which he will start and finish the various items (including procurement of materials and equipment). If requested, the schedule shall be resource loaded to reflect person/crew hours and equipment loading for various construction activities in order for the City to better evaluate the proposed schedule.
(a) City Review of Schedule – The City may review and note exceptions to the Contractor’s schedule, if it is not sufficiently detailed to clearly show the work to be completed during each month to assure the completion of the work within the project duration. The Contractor will be solely and exclusively responsible for resolving any exceptions, and the City’s review will not create any scheduling obligations of the City. Any noted corrections to the schedule shall be addressed within five (5) working days. (b) Update of Schedule – After submission of a schedule to which the City has taken no exceptions, the Contractor shall submit an updated schedule on a monthly basis or as otherwise specified by the City until completion of the work. The updated schedule must show the “As Constructed” progress up to the date for which the schedule has been prepared and reflect any proposed changes in the method of operations, to achieve the project milestones within the required project duration. (c) Float – The schedule must show early and late completion dates for each task. The number of days between these dates will be designated as “float”. The float will be assigned to the project and available for the City, at the Engineer’s discretion, to allocate the “float” to the Contractor as needed to complete the work in accordance with the agreement.
(d) Failure to Submit Schedule – If the Contractor fails to submit a schedule within the time periods specified in this sub-section, or submits a schedule to which the City has taken uncorrected exceptions, the City may withhold payments to the Contractor until such schedule is submitted and/or corrected in accordance with the Contract Documents.

8.06 Three-Week Look Ahead Schedule - The Contractor is required to furnish to the Engineer,
on a weekly basis at the project’s progress meetings, a three-week look ahead schedule. The schedule

8.k
February 27, 2023

Packet Pg. 319

General Provisions 2023 Sewer System Root Foaming Project Page P-32 Project No. C1752-23
must show planned activities in sufficient detail to allow proper monitoring of the planned construction activities.

8.07 Construction Sequence - The Contractor shall prepare and submit at the pre-construction meeting a staging or phasing plan identifying the sequence of construction work and traffic control needed to complete the project. The staging plan shall be subject to review and approval by the Engineer, prior to the start of construction. The goal of the phasing plan will be to minimize impacts to surrounding businesses and residents in the project areas. When required by the Special Provisions or plans, the Contractor shall follow the sequence of operations as set forth therein.

8.08 Recording Existing Conditions - Existing conditions throughout the project site shall be photographed and/or videotaped by the Contractor before starting construction. Recording shall include and show every detail of existing improvements, including the current condition of the curb, gutter, sidewalk, signs, landscaping, streetlights, structures near the project including face of buildings, canopies, shades, fences and any other features within the limits of work. Photos and/or videotape shall be delivered to the Engineer at the pre-construction meeting.

8.09 Preconstruction Conference - The City shall designate a date and time for the pre- construction conference once the contract has been fully executed. At the pre-construction conference, the City shall discuss various administrative procedures and project coordination issues. At a minimum, the Contractor should be prepared to furnish and discuss the following:
(a) Letter designating the Superintendent.
(b) A list of key personnel and emergency contact information including telephone numbers to be used in case of emergency
(c) Sequence or phasing plans identifying the phasing of construction work and any alternative sequences for consideration.
(d) Traffic control plans associated with the staging plans (to be signed and stamped by a Licensed Traffic Engineer).
(e) A draft of the master Baseline Construction Schedule, in Critical Path Method (CPM) format (to be finalized no later than ten (10) days after the Notice to Proceed). (f) A breakdown of lump sum bid items to be used as a basis for determining the value of work completed on future progress payments.
(g) A submittal schedule listing all project submittals that will need to be reviewed and a listing of proposed material suppliers.
(h) Utility company coordination and/or permit issues.
(i) Videotape and/or photography of the project’s existing condition (to be completed prior to starting construction.
(j) Anticipated cash flow projections, if requested by the engineer.

8.10 Progress Meeting - The Contractor, Job Superintendent and Subcontractors, if requested by the City, shall attend weekly progress meetings to be scheduled by the Engineer at a time agreeable to both the Engineer and the Contractor. Contractor shall also attend special meetings in addition to regular progress meetings if necessary and directed by the Engineer.

8.11 Hours of Construction - Construction activities shall be limited to the hours of 8:00 a.m. to 6:00 p.m., unless otherwise noted or further restricted in the Contract Documents, or as directed by the Engineer. No work shall be done on weekends, holidays or outside these specified hours, unless otherwise approved by the Engineer. The Contractor shall take into consideration and coordinate time constraints for special events or activities organized by the City or other agencies. No mechanical equipment, including hauling or deliveries by trucks, shall start before 8:00 a.m. and all equipment must shut down before 6:00 p.m. unless approved by the Engineer.

8.k
February 27, 2023

Packet Pg. 320

General Provisions 2023 Sewer System Root Foaming Project Page P-33 Project No. C1752-23

8.12 Prosecution of Work - To minimize public inconvenience and possible hazards and to restore the streets and other work areas to their original condition and former state of usefulness as soon as practicable, the Contractor shall diligently prosecute the work to completion. If, in the Engineer’s opinion the Contractor fails to prosecute the work to the extent that the above purposes are not being accomplished, the Contractor shall, upon orders from the Engineer, immediately take the steps necessary to fully accomplish said purposes. All costs for prosecuting the work as described herein shall be absorbed in the Contractor’s bid. Should the Contractor fail to take the necessary steps to fully accomplish said purposes, after orders of the Engineer to do so, the Engineer may suspend the work in whole or in part, until the Contractor takes said steps. With or without such suspension, the Engineer may cause such steps to be taken by force account or by other means at the Contractors expense.

8.13 Suspension of Work - Work may be stopped or suspended in whole or in part for up to ninety (90) days when, in the Engineer’s opinion, the suspension is necessary and in the interest of the City. The Contractor shall immediately comply with any written order of the Engineer suspending work.

Such City directed suspension shall be without liability to the Contractor on the part of the City. Suspended work shall be resumed upon written order of the Engineer. An extension of contract time equal to the period of suspension shall be issued to the Contractor by change order. Any claim by the Contractor for an adjustment of the contract sum or the contract time shall be made within ten (10) working days after the end of the work suspension.

If work is suspended through any fault of the Contractor, all expenses and losses incurred by the Contractor during such suspensions shall be borne by the Contractor. If the Contractor fails to properly provide for public safety, traffic, and protection of the work during periods of suspension, the City may elect to do so, and shall deduct the cost thereof from monies due the Contractor. Such action will not relieve the Contractor from any liability.

8.14 Default by the Contractor and Termination of Control - As a result of any of the following events, the Contractor shall be deemed to be in default:
(a) If the Contractor is in bankruptcy or makes a general assignment for the benefit of creditors, or
(b) If the Contractor fails to make prompt payment to subcontractors for labor or materials, or (c) If a receiver is appointed on account of the Contractor’s insolvency, or (d) If the Contractor fails to provide enough properly skilled workmen or enough materials to insure compliance with the construction time schedule, or (e) If the Contractor fails to perform any portion of the work within the timing requirements of the Contract Documents, or abandons the project site, or (f) If the Contractor disregards instructions from the Engineer or violates any provision of the contract, or
(g) If the Contractor fails to replace or repair any damage caused by the Contractor or its agents, representatives, contractors, subcontractors, or employees in connection with the performance of the work, or
(h) If the Contractor violates any legal requirement related to the work.

In case of default, the City may give written notice to the Contractor and the Contractor’s bonding agent that if the default is not remedied within ten (10) calendar days or the Contractor does not provide adequate written assurance to the satisfaction of the Engineer that the cure will be forthcoming, the Contractor’s control over the work may be terminated as of the date specified in the written notice.

Upon such termination of control the City may enter upon and take possession of the entire work and may also take possession, for the purpose of completing the work, of all of the Contractor’s tools, equipment and appliances upon the work, and all materials on the site or stored off-site for incorporation into the work. The City may, at its sole option and without further notice to anyone, complete the work by

8.k
February 27, 2023

Packet Pg. 321

General Provisions 2023 Sewer System Root Foaming Project Page P-34 Project No. C1752-23
day labor, by contract entered into by negotiations, by competitive bidding, by calling upon the performance of the performance bond surety, or by other means as the City, in its discretion, shall elect.

After termination of the Contractor’s control over the work as herein provided, the Contractor shall not be entitled to any further payments under the contract until the entire work thereunder has been fully completed and finally accepted by the City. After such completion and acceptance, if the “unpaid balance of the contract price” (as defined in the next paragraph) exceeds the sum of the amounts expended by the City in taking over and completing the work, including all managerial and administrative expense incurred by the City on account thereof and the amount of all damages incurred by the City by reason of the Contractor’s default, such excess shall be paid to the Contractor. If the said amount expended exceeds the unpaid balance, the Contractor and his surety shall be liable to the City for the difference. At the Contractor’s request, the expense incurred by the City in taking over and completing the work, and the amount of any damage incurred by the City by reason of the Contractor’s default shall be audited and certified by an independent third party, whose certificate thereof shall be binding and conclusive upon the parties.

For the purposes of the computations required by the paragraph above, the “unpaid balance of the contract price” shall be the original contract price as adjusted by any change orders issued prior to termination of the Contractor’s control, less all payments made on account thereof prior to such termination, and less any and all amounts withheld or paid pursuant to stop notices filed with the City upon claims of subcontractors or others from equipment, labor or materials furnished to the work on behalf of the Contractor.

Upon completion and acceptance of the work, the Contractor shall be entitled to the return of all materials not used in the work, but without claim against the City for loss or damage with respect thereto, and shall be entitled to the return of all his equipment, tools and appliances taken possession of by the City, but without claim against the City for any charge for the use thereof or for usual and ordinary depreciation and wear and tear.

The exercise of remedies provided for in this sub-section, for default by the Contractor, shall be in addition to, and shall not be deemed a waiver by the City of any other rights or remedies due the City under the contract provisions, for default by the Contractor.

8.15 Contractor’s Right to Stop Work or Terminate Contract – The Contractor may give written notice to the Engineer of intention to stop work or terminate the Agreement, or both if the work should be stopped by order of any court or other public authority, through no act, omission or fault of the Contractor or any Subcontractor, agent or employee of the Contractor, and such work stoppage under such order shall continue for thirty (30) consecutive days from the effective date of such order If, after the Contractor provides notice to the City of any of the above defaults, the City does not remedy the default within ten (10) calendar days, the Contractor may stop work and may give the City written notice of contract termination. The Contractor may then recover from the City payment for all work executed to date and any loss sustained upon any equipment or materials procured for the work prior to the work stoppage. No compensation for loss of anticipated profits will be provided, however, on work not completed. The Contractor’s right to recovery shall be subject, however, to the duty of the Contractor to mitigate all loss or damage so far as reasonably possible.

8.16 City’s Right to Terminate Contract – The City may, at its option, terminate the Agreement, in whole or from time to time in part, at any time by giving notice to the Contractor. Upon such termination, the Contractor agrees to waive any claims for damages, including loss of anticipated profits, on account thereof; and, as the sole right and remedy of the Contractor, the City shall pay the Contractor in accordance with this sub-section. Upon termination, the obligations of the Contractor for portions of the work already performed shall continue.
(a) Upon receipt of a Notice of Termination, the Contractor shall, unless the notice directs otherwise, do the following:

8.k
February 27, 2023

Packet Pg. 322

General Provisions 2023 Sewer System Root Foaming Project Page P-35 Project No. C1752-23

1. Immediately discontinue the work to the extent specified in the notice.

2. Place no further orders or subcontracts for materials, equipment, services, or facilities, except as may be necessary to complete such portion of the work that are not to be discontinued.

3. Promptly cancel, on the most favorable terms reasonably possible, all subcontracts to the extent that they relate to the performance of the discontinued portion of the work.

4. Thereafter do only such work as may be necessary to preserve and protect the work already in progress and to protect materials, plants, and equipment on the project site or in transit thereto.
(b) Upon such termination, the City shall pay to the Contractor as a sole and exclusive remedy for the termination, the sum of the following, and the Contractor will be entitled to no other compensation or damages, and expressly waives same:

1. The amount of the contract amount allocated to the portion of the work properly performed by the Contractor as of the date of termination, less sums previously paid to the Contractor, plus

2. Previously unpaid costs of any items delivered to the project site which were fabricated for subsequent incorporation in the work, plus

3. Any proven losses with respect to materials and equipment directly resulting from such termination, plus

4. Reasonable demobilization costs in excess of what would have been incurred if work were not terminated, plus

5. Reasonable costs for preparing a statement of the aforesaid costs, expenses, and losses in connection with such termination.

The City may terminate the Agreement at its own discretion or when conditions encountered during the work make it impossible or impracticable to proceed, or when the City is prevented from proceeding with the Agreement by act of God, by law, or by official action of a public authority.

8.17 Time of Completion and Days Charged - The Contractor shall diligently prosecute and fully complete the work within the number of calendar or working days set forth in the Notice inviting Sealed Proposals or shall be subject to liquidated damages. Time is of the essence in the performance of all obligations under the Contract Documents, and all timing requirements shall be strictly adhered to unless otherwise modified by the City. See General Provisions, Sections 8.12, “Prosecution of Work”, and 8.18, “Liquidated Damages”.

Under a calendar day contract, City observed holidays and inclement weather delays are to be anticipated and unless there is a deviation from what is customary for the time of year the project is under construction, no additional days will be granted. Every day, including holidays, Saturdays and Sundays shall be counted as a day charged under a calendar day contract.

Under a working day contract, the Contractor will be given credit for City observed holidays and inclement weather delays, in accordance with the State Standard Specifications. Should the Contractor prepare to begin work at the regular starting time in the morning of any day on which inclement weather, or the conditions resulting from the weather prevents the work from beginning at the usual starting time and the crew is dismissed as a result thereof and the Contractor does not proceed with at least seventy-five percent (75%) of the normal labor and equipment force engaged in the current controlling operations for at least sixty percent (60%)of the total daily time being currently spent on the controlling operations, the Contractor will not be charged for a working day whether or not conditions should change thereafter.

8.18 Liquidated Damages - The City and the Contractor, by execution of the agreement, each agree that time is of the essence in the performance of the work, and that actual damages for inconvenience

8.k
February 27, 2023

Packet Pg. 323

General Provisions 2023 Sewer System Root Foaming Project Page P-36 Project No. C1752-23
and loss from any delay in completion of the contract beyond the date provided in the Notice to Bidders is extremely difficult or impossible to determine.

The City and the Contractor further agree, as specified in the Notice to Bidders, that liquidated damages shall be assessed for each and every calendar day required to complete the contract in excess of the contract time established for the project, and that the amount stated therein is a reasonable estimate of the amount of such damages. The Engineer may deduct any liquidated damaged owed to the City, as determined by the Engineer from any payments otherwise payable to the Contractor under this agreement.

In addition, the City shall have the right to charge to the Contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, administration and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such delay, except that the cost of final surveys and preparation of the final estimate shall not be included in such charges.

Separate from the above-mentioned liquidated damages, the Contractor shall be responsible for paying all damages incurred by private businesses (residential, commercial or industrial), schools and hospitals due to non-completion of the project by the date specified.

Nothing contained herein shall limit the City’s rights or remedies against Contractor for any default other than failure to complete the work within the contract time. This provision for liquidated damages shall not be applicable nor act as a limitation upon the City if the Contractor abandons the work. In such event, the Contractor shall be liable to the City for all losses incurred.

The date of the Engineer’s Certificate of Substantial Completion shall be the termination date, if applicable, of liquidated damages.

8.19 Delays and Extensions of Time
(a) Excusable Delays - shall mean delays in the prosecution or completion of the work which result from causes beyond the control of the Contractor and City and which could not have been avoided by the exercise of care, prudence, foresight, and diligence on the part of the Contractor, suppliers, or any tier of the Contractor’s subcontractors. Excusable Delays fall into the following categories:

1. Abnormal Delays – Excusable Delays caused by acts of god, fire, unusual storms, floods, tidal waves, earthquakes, strikes, labor disputes, freight embargoes, and shortages of materials insofar as they prevent the Contractor from proceeding with at least seventy-five percent (75%) of the normal labor and equipment force for at least five (5) hours per day toward completion of the current critical path activity.

2. Weather Delays – Excusable Delays due to inclement weather conditions or the conditions resulting from weather prevent the Contractor from proceeding with seventy-five percent (75%) of the normal labor and equipment force engaged in the current critical activity item for a period of at least five (5) hours per day toward completion of the current critical path activity.

3. Material Shortage Delays – Excusable Delays due to shortages of material, provided that the Contractor submits satisfactory proof to the Engineer. For the proof to be satisfactory, the Contractor must demonstrate that he has made every effort to obtain the materials from all known sources within reasonable reach of the proposed work. Only the physical shortage of material, caused by unusual circumstances, will be considered under these provisions as an excusable delay, and no consideration will be given to any claim that material could not be obtained at a reasonable, practical, or economical price, unless it is shown to the satisfaction of the Engineer that such material was only available at exorbitant prices. A material shortage delay will not be considered for material ordered or delivered late or for material whose availability is affected by virtue of mishandled

8.k
February 27, 2023

Packet Pg. 324

General Provisions 2023 Sewer System Root Foaming Project Page P-37 Project No. C1752-23
procurement. The above provisions shall apply equally to equipment to be installed in the work.
(b) Compensable Delays - shall include delays that occur in the prosecution or completion of the work, through no fault of the Contractor which prevent the Contractor from proceeding with at least seventy-five percent (75%) of the normal labor and equipment force for at least five (5) hours per day toward completion of the current critical activity item(s) on the latest favorably reviewed progress schedule due to the following causes:

1. Delays due solely to the actions and/or inactions of the City.

2. Delays due to changed conditions as defined in General Provisions, Section 5.05, “Requests for Information, Inconsistencies and Changed Conditions”.

3. Delays due to other Contractors employed by the City who interfere with the Contractor's prosecution of the work as defined above.
(c) Inexcusable Delay - means any delay in the completion of the work beyond the expiration of the contract time resulting from causes other than Excusable Delays or Compensable Delays. An Inexcusable Delay shall not entitle the Contractor to an extension of the contract time or an adjustment of the contract sum. In addition to liquidated damages for inexcusable delays, the Contractor agrees to pay the City’s actual costs, including charges for engineering, inspection and administration incurred during the delay. (d) Concurrent Delays - those periods of delay when the prosecution of the work is delayed during the same period of time due to causes from a combination of the delays defined as Excusable, Compensable or Inexcusable.

If the Contractor desires an extension of time, he shall file a written request based upon the delays reported. The Engineer will ascertain the facts, the extent of the delays, and the effect upon the entire project, and the City will grant an extension of time equivalent to verified time lost. The request for an extension of time must be made no later than ten (10) working days after the start of the condition that purportedly caused the delay, and no later than fifteen (15) working days after the date on which performance on the condition purportedly causing the delay has ended.

Contractor may make a delay claim for an extension of the contract time for an Excusable Delay or a Compensable Delay. If an Excusable Delay and a Compensable Delay occur concurrently, the maximum extension of the contract time shall be the number of calendar days from the commencement of the first delay to the cessation of the delay which ends last. If an Inexcusable Delay occurs concurrently with either an Excusable Delay or a Compensable Delay, the maximum extension of the contract time shall be the number of calendar days, if any, by which the Excusable Delay or the Compensable Delay exceeds the Inexcusable Delay.

For a Compensable Delay, the Contractor may make a delay claim for an adjustment in the contract sum in an amount equal to the sum of the actual and unavoidable additional costs of labor, material, and equipment furnished at the site by the Contractor or subcontractors, including wages, salaries, fringe benefits and payroll taxes.

Extensions of time, when granted, will be based upon the effect of delays to the project as a whole and will not be granted for non-controlling delays to minor portions of the work unless it can be shown that such delays did, in fact, delay the progress of the project as a whole. For purposes of determining delays, all float associated with the project schedule shall belong to the project. See General Provisions, Section

8.05, “Baseline Construction Schedule”.

If delays are caused by unforeseen events beyond the control of either the Contractor or the City, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor shall not be entitled to damages or additional payment due to these delays. War, governmental regulations, labor disputes, strikes, fires, floods, adverse weather necessitating cessation of work, other similar action of the elements, inability to obtain materials, equipment, or labor because of Federal Government restrictions arising out of National Defense, required extra work, action or inaction by the City, or other

8.k
February 27, 2023

Packet Pg. 325

General Provisions 2023 Sewer System Root Foaming Project Page P-38 Project No. C1752-23
specific reasons as may be further described in the specifications may constitute such a delay. If delays beyond the Contractor’s control are caused by reasons other than those mentioned above, but are substantially equal in gravity to those enumerated, an extension of time may be granted, if deemed by the Engineer to be in the best interests of the City.

The Contractor shall be entitled to an extension of time if delayed due to a failure of the City to furnish necessary right-of-way or materials which the City agreed to furnish, or by the City’s failure to supply necessary plans or instructions concerning the work, after written request by the Contractor.

For Compensable Delay periods resulting in indirect overhead expenses, the Contractor shall be reimbursed as provided for in General Provisions, Section 5, “Changes in Work”.

8.20 Substantial Completion – When work in accordance with the Contract Documents has progressed to a stage of one-hundred percent (100%) complete, as determined by the Engineer, except for the completion of minor punch list items of deficiencies or omissions in the work which require correction in order to satisfy the agreement, yet do not impair the City’s ability to occupy and fully utilize the work for its intended purpose, the project shall be deemed “Substantially Complete”. Portions of the work may also be designated by the City as substantially complete if the Contract Documents require separate delivery.

When the Engineer determines that the work or such designated portions of the work are substantially complete, the Engineer will prepare and sign a Certificate of Substantial Completion. The date of substantial completion shall establish the date at which days charged against the project duration shall terminate. The date of substantial completion shall also establish the date of occupancy by the City and the transfer of responsibility from the Contractor to the City for such items as security, maintenance, heat, utilities, insurance, and damage to the work from causes other than that of the Contractor. Unless otherwise indicated in the Certificate of Substantial Completion, the Contractor’s guarantee for the work shall commence upon the date of substantial completion. See General Provisions, Section 11.01, “Contractor’s Guarantee”.

8.21 Project Closeout - After the Contractor has received the Certificate of Substantial Completion and has only minor work remaining, project closeout may begin. The following items and procedures are required as part of the project close out process. (a) Following the completion of punch list items, the Contractor shall make a written request to the city to conduct a final inspection. The written request shall be accompanied by a Certification that the work has been performed in accordance with the Contract Documents. (b) Within fourteen (14) days of receipt of the Contractor's Certificate of Completion, a final inspection will be scheduled and conducted by the City. As a result of the inspection, the City will advise the Contractor of any work that must be completed or corrected before Acceptance, in the form of a punch list.
(c) The City will conduct a re-inspection of the punch list items within when requested by the Contractor, in writing, with assurances that the punch list requirements have been met.

Any charges by a Consulting Engineer/Architect hired by the City to do repeat re-inspection of the punch list may be recovered from the Contractor. (d) The contractor shall provide a final payment request with lien releases (if applicable) in a format acceptable to the City.
(e) The as-built drawings and all record documents and shall be provided to the City by the Contractor including but not limited to, equipment operation and maintenance manuals, copies of warranties, shop drawings, product data, etc. Record documents shall be properly identified and organized into binders.

8.22 Final Completion - After the Contractor has received the Certificate of Substantial Completion along with the punch list, and has completed the items identified as necessary for project closeout, the Engineer will make a determination as to if the work is fully completed and in accordance with the Contract Documents. If so, the Engineer will recommend final acceptance to the City Council.

8.k
February 27, 2023

Packet Pg. 326

General Provisions 2023 Sewer System Root Foaming Project Page P-39 Project No. C1752-23
Should it become necessary, due to developed conditions, for the City to occupy any portion of the work, or any part of any structure or equipment, before the contract is completed or accepted, such occupancy shall not constitute an acceptance of any part of the work, unless so stated in writing by the City.

8.23 Final Acceptance – Final acceptance by the Engineer will be considered after the work has been fully completed. A Notice of Completion will be filed with the County Recorder once Final Acceptance has been made.

8.24 Risk of Loss - The Contractor shall be responsible for the charge, care and protection of the project and shall bear all risks of injury or damage to the work, materials or equipment delivered to the site, by any means including fire, earthquake, wind, storm or other action of the elements, vandalism, or loss by theft, from the date of Notice to Proceed to the date of the filing of the Notice of Completion by the Engineer. The Contractor shall rebuild, repair, restore and make good all injuries or damage to any portion of the work, and shall bear the entire expense thereof, except such injuries or damages that are caused by riot, insurrection, acts of the Federal or State Government, or a public enemy in time of war.

8.25 Use of Improvements During Construction - The City reserves the right to take over and utilize all or part of any completed facility or appurtenance. Such action by the City will not relieve the Contractor of responsibility for injury or damage to said completed portions of the improvement resulting from use by public traffic, from the action of the elements or from any other cause attributable to the Contractor’s operations or negligence. The Contractor will be required to restore such portions of the improvement before final acceptance. Nothing in this Section shall be construed as relieving the Contractor from full responsibility for correcting defective work or materials.

8.k
February 27, 2023

Packet Pg. 327

General Provisions 2023 Sewer System Root Foaming Project Page P-40 Project No. C1752-23
SECTION 9 —RESPONSIBILITIES OF THE CONTRACTOR

9.01 Contractor’s Responsibility for the Work - The Contractor shall supervise, coordinate, and direct the work using Contractor’s best skill and attention. Contractor shall have control over and be solely responsible for construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the work in accordance with the terms of the Contract Documents until the completion and final acceptance of the work by the City. The Contractor shall furnish and maintain in good condition all equipment and facilities as required for the proper execution and inspection of the work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.

The Contractor shall rebuild, repair, restore and make good all injuries, damages, re-erections and repairs occasioned or rendered necessary by causes of any nature whatsoever, excepting only acts of God and none other, to all or any portions of the work, excepting as otherwise stipulated.

9.02 Contractor’s Responsibility for Subcontracted Work - The City will deal directly with, and make all payments to the Contractor only. The Contractor shall be responsible for the coordination of all trades, subcontractors, and suppliers engaged upon the work. Neither the City nor the Engineer will undertake to settle any differences between the Contractor and his subcontractors.

All persons engaged in the work, including subcontractors, will be considered as employees of the Contractor. The Contractor will be held responsible for their work and shall be responsible to the City for acts and omissions including those by their respective agents and employees.

When subcontracted work is not prosecuted in a manner satisfactory to the Engineer, the Contractor shall be notified to take corrective action within a specified time. If timely correction is not made, then upon receipt by the Contractor of written instructions from the Engineer, the Subcontractor shall be removed immediately from the work and shall not be reemployed.

9.03 Superintendent -
The Contractor shall employ, and provide a written letter designating a superintendent and/or representative and all their contact information. The superintendent and/or representative shall be present on the job site whenever work is in progress to coordinate all work with the City and neighboring property owners, and who shall be available by phone twenty-four (24) hours per day, seven (7) days a week up to the Final Acceptance of the work by the City. A backup representative may also be provided. A joint venture shall designate only one Superintendent.

City approval of the Superintendent is required prior to starting work. The City reserves the right to request an appropriately qualified replacement of t he Superintendent any time during construction of t he project. Contractor shall provide the Engineer with the Superintendent’s telephone number, along with an after-hours emergency contact number of a responsible person who shall correct hazardous situations, should they occur, during times other than the normal working hours.

Directions and information given to the Superintendent shall be considered as having the same effect as if delivered to the Contractor and the Superintendent shall have full authority to execute the same and to supply materials, tools and labor without delay, and who shall be the legally appointed representative of the contractor. Contractor shall be liable for the faithful observation of any instructions delivered to him or to his appointed representatives.

9.04 Character of Workers - Contractor shall provide competent, fully qualified personnel to perform the work and shall at all times maintain good discipline and order among its employees and Subcontractors. Any employed person or Subcontractor who is found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable or who fails or refuses to perform his work properly and acceptably, shall be immediately removed from the work by the Contractor and shall not be reemployed.

Such discharge shall not be the basis of any claim for compensation or damages against the City of San Carlos or any of its officers, employees or agents.

8.k
February 27, 2023

Packet Pg. 328

General Provisions 2023 Sewer System Root Foaming Project Page P-41 Project No. C1752-23

9.05 Laws to be Observed - The Contractor shall keep himself fully informed of, and at all times observe and comply with all Federal, State and County laws, including those of CAL-OSHA; all municipal ordinances and regulations of the City of San Carlos; and all orders and decrees of bodies having jurisdiction over the work. The Contractor shall also cause all agents and employees engaged on the project to observe and comply with all such laws, and shall protect and indemnify the City of San Carlos and all officers, employees, and agents thereof connected with the work against any claim or liability arising from or based on the violation of any such law
(a) Non-Discrimination – Attention is directed to Labor Code, Section 1735 which reads as follows: “No discrimination shall be made in the employment of persons upon public work because of the race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status or sex of such persons, except as provided in Government Code, Section 12940 and every Contractor for public works violating this Section is subject to all the penalties imposed for a violation of this chapter.” (b) A lien Labor - The Contractor shall forfeit as penalty to the City of San Carlos fifty dollars ($50.00) for each alien with no permit to work in the United States of America (USA) knowingly employed in the contract, by him or by any Subcontractor under him upon any of the work herein mentioned, for each calendar day, or portion thereof, during which such alien is permitted or required to labor in violation of the provisions of the Labor Code and in particular Sections 1850 to 1854 thereof, inclusive. (a) Hours of Labor – Hours of labor shall be pursuant to Labor Code, Sections 1810. Pursuant to Labor Code, Sections 1813, Contractor shall forfeit to the City, as a penalty, twenty-five dollars ($25.00) for each worker employed in the execution of this Agreement by Contractor, or any Subcontractor in violation of the terms of this Section or in violation of the provision of any law of the State of California. Such forfeiture amounts may be deducted from the contract sum. Contractor and each Subcontractor shall keep, or cause to be kept, an accurate record showing the actual hours worked each calendar day and each calendar week by each worker employed on the project, which record shall be kept open at all reasonable hours to the inspection of the City, its officers and agents, and to the inspection of the appropriate enforcement agency of the State of California. (d) Prevailing Wage – As identified in the Notice to Bidders, the work contemplated by this agreement is a public work subject to prevailing wages under California Labor Code, Sections 1720 et. seq. The State of California Department of Industrial Relations has ascertained the general prevailing per diem wage rates in the locality in which the work is to be performed for each craft, classification, or type of worker required to perform the work.

A schedule of the most recent general prevailing per diem wage rates made available to the City will be on file at the City’s principal facility office and will be made available to any interested party upon request. This prevailing wage rate schedule is provided by the City for Bidder’s information only and is not guaranteed by the City to be current. Contractor is obligated to verify all appropriate prevailing wage rates and pay those rates as required.

By this reference the verified current schedule of prevailing wage rates is made part of the Contract Documents. Contractor shall pay not less than the prevailing per diem wage rates, as specified in the schedule and any amendments thereto, to all workers employed by Contractor in the execution of the work. Contractor shall cause all subcontracts to include the provision that all Subcontractors shall pay not less than the specified prevailing per diem wage rates to all workers employed by such Subcontractors in the execution of the work.

Contractor shall forfeit to the City, as a penalty, no more than fifty-dollars ($50.00) for each calendar day or portion thereof for each worker that is paid less than the specified prevailing per diem wage rates for the work or craft in which the worker is employed for any portion of the work done by Contractor or any Subcontractor in violation of the provisions of the Labor Code, and in particular Sections 1770 to 1781 thereof, inclusive. Such forfeiture amounts may be deducted from the contract sum. Contractor shall also pay to any worker who was paid less than the specified prevailing per diem wage rate for the work or craft for which the worker was employed for any portion of the work, for each calendar day, or

8.k
February 27, 2023

Packet Pg. 329

General Provisions 2023 Sewer System Root Foaming Project Page P-42 Project No. C1752-23
portion thereof, for which the worker was paid less than the specified prevailing per diem wage rate, an amount equal to the difference between the specified prevailing per diem wage rate and the amount which was paid to the worker.

The City will not recognize any claim for additional compensation because of the payment by the Contractor for any wage rate in excess of prevailing wage rates set forth in the Agreement, including payment in excess of the prevailing wage for extra work paid by force account. The possibility of wage increases is one of the elements to be considered by the Contractor in determining the Contractor’s bid and will not, under any circumstances be considered as the basis of a claim against the City under the Agreement. (e) Payroll Records - Pursuant to Labor Code, Sections 1776, Contractor and all Subcontractors shall keep an accurate payroll record, showing the name, address, social security number, job classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in connection with the work. All payroll records shall be certified as being true and correct by Contractor or Subcontractors keeping such records; and the payroll records shall be provided to the City no later than three weeks after closing of payroll. The Contractor and all Subcontractors must also furnish electronic certified payroll records to the Labor Commisioner of the State of California, Department of Industrial Relations.
(f) Apprentice Program - Attention is directed to State of California Labor Code, Sections 3095, 1777.5, 1777.6, and 1777.7 and Title 8, California Code of Regulations, Section 200, and the applicable Sections that follow. Responsibility for compliance with these requirements lies with the Contractor. To ensure compliance and complete understanding of the law requiring apprentices, and specifically the required ratio thereunder, Contractor or Subcontractors should, where some question exists, contact the Division of Apprenticeship Standards, 425 Golden Gate Avenue, 4th Floor, San Francisco, California, 94102 or one of its branch offices prior to commencement of the work. In the event Contractor willfully fails to comply with this Section, it will be considered in violation of the requirements of the Contract.

Nothing contained herein shall be considered or interpreted as prohibiting or preventing the hiring by Contractor or Subcontractors of journeyworker trainees who may receive on- the-job training to enable them to achieve journeyworker status in any craft or trade under standards other than those set forth for apprentices.
(g) Safety Program – the Contractor shall conform to the rules and regulations pertaining to safety established by the California Division of Industrial Safety and to all requirements as set forth in the State of California Construction Safety Orders (CAL-OSHA), and in particular, Article 3 of these Safety Orders, regarding Accident Prevention and safety meetings. Within ten (10) working days following the Notice of Award the Contractor shall provide a copy of the Contractor’s Safety Plan. The price paid for the plan is included in the various contract items of work and no additional compensation will be made therefore.

9.06 Permits and Fees – Unless otherwise stated in the Special Provisions, the Contractor shall procure all permits, registrations and licenses, including a City business registration, pay all charges and fees, and give all notices necessary for lawful prosecution of the work. All permits, registrations, licenses, and other authorizations shall be secured in sufficient time to prevent delays to the work. The Contractor shall comply with the provisions of said permits, licenses and other authorizations. The contractor shall submit satisfactory proof to the City, prior to issuance of the Notice to Proceed, that such permits, registrations or licenses are and will be in effect throughout the entire life of this contract. The contractor shall keep all permits, registrations and licenses posted on the job site.

For City Capital Improvement Construction Projects, the Contractor shall obtain a “No Fee” encroachment and/or building permit. Contractor shall coordinate through the Engineer to insure that all appropriate construction inspections occur.

8.k
February 27, 2023

Packet Pg. 330

General Provisions 2023 Sewer System Root Foaming Project Page P-43 Project No. C1752-23

9.07 Coordination and Cooperation - Construction work by utility companies or ot her Contractors may be needed or may be occurring simultaneously within or adjacent to the limits of work for this pro ject.

The Contractor shall coordinate and cooperate with all other Contractors and utility companies throughout the duration of this project to avoid delays and minimize interference and conflicts. Cooperation will be required in the arrangement for the storage of materials, and in the detailed execution of the work. It is the Contractor’s responsibility to ascertain the nature of work by others, coordinate his work, and install, modify, and maintain traffic control as necessary to avoid interferences and delays on the construction activi ties.

Failure of the Contractor to keep informed of the work progressing on the site and failure to give written notice of lack of progress or defective workmanship by others shall be construed as acceptance by the Contractor of the status of the work as being satisfactory for proper coordination with his own work.

Where the work of one trade joins or is on the other’s work, there shall be no lack of continuity or discrepancy when work is completed. In conforming one kind of work with another, marring or damaging other work will not be permitted. Should improper work of any trade be covered by another which results in damage or defects, the whole work affected shall be made good by the Contractor without expense to the City.

The City reserves the right to perform work or allow others to perform work, as necessary, within or adjacent to the limits of this project, at any time. If the Contractor or any of his Subcontractors or employees causes loss or damage to any separate Contractor on the work, the Contractor, by agreement or arbitration, if he deems it necessary, will settle any claim for such loss or damage. If such separate Contractor shall sue the City, on account of any loss so sustained, the City shall notify the Contractor, who shall indemnify and hold harmless the City against any loss or damage arising therefrom, including the cost and expense of defending any such suit.

If any portions of the work specified herein are to be installed in any right-of–way owned by the State, County, Municipality, or other public entities or public utilities, it shall be incumbent upon the contractor to familiarize described above will necessarily be subject to their inspection and approval before acceptance of these portions of the work by the Engineer. Any costs for inspection by agents other than those of the City shall be borne by the contractor. Where other agencies have jurisdiction over some portion of the work, and the requirements of the agencies are at variance with this specification, then that portion of the work shall be done in accordance with the requirements of the agency(ies).

The Contractor shall absorb in his bid all costs involved in coordinating his work with others. The Contractor will not be entitled to additional compensation from the City for damages resulting from such simultaneous, collateral and essential work.

9.08 Use of Premises - The Contractor shall confine construction act ivities to the project limits; which shall consist of right-of-way, easements and/or property owned by the City of San Carlos. With prior approval of the Engineer, adjacent street right-of-way may also be utilized for day-to-day operations. Unless approved by the Engineer, no storage of materials and equipment will be allowed to remain within the right- of-way during non-working hours, on the weekends, or during holidays.

Each day, after the completion of construction oper ations, unless otherwise approved by the Engineer, the project limits shall be secured and m ade accessible to the public. All excess materials and equipment not protected by approved traffic control devices (such as k-rails) shall be relocated to a staging area or demobilized. Trench spoils shall be off-hauled daily and open excavations shall be protected with steel plates.

Personnel of Contractor and Subcontractors shall not occupy, live upon, or otherwise make use of the project site during any time that work is not being performed at the project site, except as otherwise provided for in the Contract Documents for issues such as site security.

9.09 Construction Staging and Field Office - If additional space beyond the construct ion limits is necessary for staging, the Contractor shall, at his own cost and initiative, make special arrangements with neighboring property City(s) to secure a staging area for a field office and/or material and equipment storage.

8.k
February 27, 2023

Packet Pg. 331

General Provisions 2023 Sewer System Root Foaming Project Page P-44 Project No. C1752-23
The staging area must be fenced, with screening, and shall be operated in a manner that minimizes the inconvenience to neighbors.

The Contractor is encouraged to negotiate side agreements with the property owners of such sites prior to submitting bids. Prior to occupying the staging area, the Contractor will be required to provide to the Engineer a copy of the agreement or temporary const ruction easement granted by the property owner. A written release from the property owners or City, holding the City harmless from liability, will also need to be provided. In addition to approval from the property owners, the Contractor may also need to secure a Use Permit from the City’s Planning Division.

9.10 Site Security - Contractor shall be responsible for the care and custody of work and the site, including all necessary security provisions, on a 24-hour per day basis throughout the entire term of the Agreement. The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the work.

9.11 Construction Water – The Contractor is responsible for obtaining al l water required for the project and shall work with, and obtain all permits from, the appropriate water purveyor prior to obta ining construction water. If hydrant water is to be used, the Contractor must first obtain a hydrant meter and pay all related expenses. Direct connections to hydran ts without a meter are not allowed. If water truck s are used, they shall be installed with backflow prevention devices. The cost of water, including all asso ciated fees, deposits or permits shall be incorporated into the various bid items and no separate payment shall be made. Water purveyors include:

California Water Service Company Mid-Peninsu la Water District Bayshore District - Customer Center 3 Dairy Lane
341 North Delaware St. P.O. Box 129
San Mateo, CA 94401-1727 Belmont, CA 94002
M-F: 8 a.m. to 4:30 p.m. M-F: 8 a.m. to 4:30 p.m.

Tel.: (650) 558-7800 Tel.: (650) 591-8941
[email protected] midpeninsulawater.org

9.12 Project Site Maintenance – All work identified in this section shall be considered as part of the contract bid items, and no separate payment will be made thereof. (a) Disposal of Material - Unless otherwise shown on the plans or specified herein, all excess materials and materials removed from existing improvements shall become the property of, and be disposed by the Contractor. The Contractor shall be responsible for all costs associated with disposing all excess materials in a safe and legal manner. No material shall be placed on private or public property without prior approval from the City and the property owner. The Contractor shall not allow any refuse, excavated material, surplus concrete or mortar, or any associated washings, to be disposed upon paved streets, into manholes or into the City’s storm drain system.

Contractor shall establish a system for daily collection and disposal of waste materials from construction areas and elsewhere on the site. Contractor shall handle waste materials that are hazardous, dangerous, or unsanitary separately from inert waste by containerizing appropriately. Burning or burying of waste materials on site will not be permitted.

All materials removed from the existing improvements, which in the opinion of the Engineer have salvage value, shall be delivered to the City Corporation Yard at 1000 Bransten Road, San Carlos, or at any other site designated by the Engineer within the City and shall be considered as part of the contract bid items, with no separate payment will be made thereof. (b) Cleanup and Dust Control – at all times during construction, including weekends and holidays, and throughout all phases of construction, including work suspensions and until final acceptance of the project, the Contractor shall keep the work site clean and free from rubbish, debris, and prevent the formation of an airborne dust nuisance.

8.k
February 27, 2023

Packet Pg. 332

General Provisions 2023 Sewer System Root Foaming Project Page P-45 Project No. C1752-23
Materials and equipment shall be removed from the site as soon as they are no longer necessary. Upon completion of the work and before final inspection, the entire site shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance.

The Contractor shall abate dust nuisance by cleaning, sweeping, and sprinkling with water, those excavated areas of dirt or other materials which are prone to causing dust, within both the project site and the storage or staging area. If required or directed by the Engineer, the Contractor shall provide an approved water truck of large capacity with spraying capability and/or street sweeper.

The Contractor shall be required to apply water for dust control immediately during construction efforts and within one (1) hour after notification by the Engineer that an airborne nuisance exists. If dust control is not adequate, in the opinion of the Engineer, the Engineer will have this work performed by others and will deduct such cost from the total contract price.

All hauling trucks or other construction vehicles leaving the site shall be cleaned of mud or dirt clinging to exterior body surfaces or wheel rims before traveling on City streets outside the work limits. All trucks coming to or leaving the site with materials or loose debris shall be loaded in a manner, which will prevent the dropping of materials or debris on City streets.

Spillage resulting from hauling operations along or across any public traveled way shall be removed immediately.

When construction operations cause dirt to be deposited on public streets, the Contractor shall immediately remove such material. Streets shall be cleaned by street sweeping, rather than flushing, so as to prevent mud from entering the storm drain system.

Excess excavated material shall be removed from the site immediately. Sufficient material may remain for use as backfill if permitted by the specifications. Forms and form lumber shall be removed from the site as soon as practicable after stripping.

Failure of the Contractor to comply with the Engineer’s cleanup orders may result in an order to suspend work until the condition is corrected. No additional compensation will be allowed as a result of such suspension.
(c) Air Pollution Control - The Contractor shall not discharge smoke, dust, or any other air contaminants into the atmosphere in such quantity as will violate the regulations of any legally constituted authority.
(d) Noise Control - The Contractor shall make every reasonable effort to control noise generated as a result of construction to the satisfaction of the Engineer. Use of an air compressor, jackhammer or other loud, vibrating sound generating device shall be limited to operations between the hours of 8:00 a.m. and 6:00 p.m. Monday thru Friday and between 9:00 a.m. to 5:00 p.m. on Saturday and Sunday, unless otherwise authorized by the Engineer.
(e) Vermin Control - At the time of acceptance, structures entirely constructed under the contract shall be free of rodents, insects, vermin and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the contract work within the contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations.
(f) Sanitation - The Contractor shall provide and maintain enclosed toilets for the use of employees engaged in the work. These accommodations shall be maintained in a neat and sanitary condition. They shall also comply with all applicable laws, ordinances and regulations pertaining to the public health and sanitation of dwellings and camps. (g) Wastewater - Wastewater systems shall not be interrupted. Should the Contractor disrupt existing sewer facilities, the Contractor shall immediately notify the Engineer, and the

8.k
February 27, 2023

Packet Pg. 333

General Provisions 2023 Sewer System Root Foaming Project Page P-46 Project No. C1752-23
Contractor shall establish a plan, subject to the approval of the City, to convey the sewage in closed conduits and disposed of it back into the sanitary sewer system. Sewage shall not be permitted to flow in trenches or be covered by backfill. (h) Temporary Light, Power and Water - The Contractor shall at his own expense furnish, install, maintain, and remove all temporary light, power, and water, including piping, wiring, lamps, and other equipment, necessary for the work. The Contractor shall not draw water from any water source, except to extinguish a fire, without first obtaining permission from the appropriate water utility company/agency.
(i) Storm Water Pollution Control – All work shall conform to the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ, NPDES No.

CAS000002) ("General Permit"), and the NPDES Municipal Regional Stormwater Permit (MRP) (Order No. R2-2015-0049, NPDES No. CAS612008). The Contractor shall implement all applicable San Mateo Countywide Water Pollution Prevention Program (SMCWPPP) measures and Best Management Practices (BMPs). Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations and/or a stop work order.

The Contractor shall submit to the City a Stormwater Pollution Prevention Plan (SWPPP) or Water Pollution Control Plan (WPCP), prepared in compliance with all NPDES requirements. The SWPPP/WPCP prepared by the Contractor shall address how the Contractor will prevent materials from being rinsed or washed into the storm drain system and specify which BMPs will be implemented for preventing sediment and pollutant discharges into the storm water system. The Contractor shall provide for the construction of facilities which may be required to prevent, control, and abate water pollution.

All construction efforts shall be conducted in a manner which prevents the release of hazardous material or hazardous waste into the soil or groundwater, and minimizes the discharge of pollutants into the storm drain system. No pollutants will be allowed to enter the storm drainage system. The Contractor shall be responsible for containing and removing any waste from the Contractor’s construction operations using the appropriate BMP. The Contractor shall be responsible for cleaning catch basins of solid or liquid waste materials originating from the Contractor’s operation before this material migrates further into the storm drain system. Violation of this provision shall cause the City to issue a stop- work notice and take necessary action to require the Contractor to correct and comply with regulations. All costs related to the stop-work action and corrective work to come into compliance shall be fully borne by the Contractor.

Existing Drainage Conditions - If the work performed interferes with established drainage patterns, ample provisions shall be made by the Contractor to correct the interference. The City may also direct the Contractor to take additional measures to be performed at the Contractor 's expense.

Illicit Discharge - No dumping or discharge of construction materials, debris, and hazardous materials will be permitted into the City's storm drainage system. In the event of any discharge, leakage, spill or emission of hazardous materials, Contractor shall promptly notify the City and shall clean all affected property. The Contractor shall indemnify, hold harmless and defend the City against all liability incurred as a result of any such discharge, leakage, spill or emission, regardless of whether such liability, cost or expense arises during or after the term of the permit.

9.13 Preservation of Property - The Contractor shall be responsible for the protection of public and private property adjacent to the work.

Due care shall be exercised to avoid damage to existing roadway improvements and facilities, adjacent property, roadside trees, lawn and shrubbery not designated for removal, pole lines, fences, signs, survey markers and monuments, buildings and structures, conduits, pipe lines under or above ground,

8.k
February 27, 2023

Packet Pg. 334

General Provisions 2023 Sewer System Root Foaming Project Page P-47 Project No. C1752-23
sewer and water laterals, and any other improvements or facilities within or outside the limits of construction.

As ordered and approved by the Engineer, the Contractor shall provide and install suitable safeguards to protect such objects from injury or damage. If such objects are injured or damaged by reason of the Contractor’s operations, they shall be replaced or restored, at the Contractor’s expense, to a condition as good as when the Contractor entered upon the work, or as good as required by the Contract Documents.

Existing striping damaged during construction within and adjacent to the project site shall be replaced with thermoplastic. Partially damaged striping (such as what might occur trenching through a pavement legend), shall be replaced in their entirety.

Contractor shall preserve carefully bench marks, reference points, and stakes; in case of willful or careless destruction, he will be charged with the resulting expense of replacement and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance.

Any survey monuments that are damaged or removed as part of the construction shall be replaced by the Contractor and a Record of Survey, as required by State law, shall be filed by a licensed Land Surveyor at the Contractor's expense.

The fact that any such improvement or facility is not shown upon the plans shall not relieve the Contractor of his responsibility under this Section. It shall be the Contractor’s responsibility to ascertain the existence of any underground improvements or facilities indicated on the plans, indicated by locating services, or as evidenced by facilities visible in the field.

Contractor shall protect his work, supplies and materials from damage due to the nature of the work, the action of the elements, trespassers, or any cause whatsoever which is under his control, until the completion and acceptance of the work. Neither the City nor any of the City's agents assume any responsibility for collecting indemnity from any person(s) causing damage to the work of the contractor.

9.14 Protection of Buried Utilities – When the Contractor's attention is directed to the existence of pipes, cables, culverts, and other underground structures and improvements which may or may not be shown on the plans, it is the responsibility of the contractor to ascertain the exact location of such underground utilities in advance of any digging operations so that they shall not be disturbed or damaged by him during the progress of the work. All expenses of whatever nature arising from such disturbance or replacement or repair thereof shall be borne by the contractor.

If the location of pipelines being installed by the contractor under this contract conflicts with the location of existing pipelines, contractor shall so notify the Engineer in writing. The Engineer will ascertain the location of the existing utility in question and may at his discretion relocate the pipeline being installed for the convenience of the contractor. It shall not be construed that the City or the Engineer is in any way required or obligated to locate or relocate pipelines to locations other than shown on the contract plans. If the Engineer relocates pipelines at the request of the contractor, the contractor shall bear all the expenses incurred in connection therewith.

9.15 Protection of Bridges - Contractor shall be responsible for any damage he may cause to bridges, culverts and road structures. He shall determine in advance the allowable safe load for each structure and, if necessary, provide special shoring and support at his expense.

9.16 Protection of Traffic Signal Facilities - The Contractor shall give at least seventy-two (72) hours advance notice to the Engineer before commencing any street work (such as pavement grinding or trenching) that may potentially damage any traffic signal detection loop wires or any other signal facility.

This requirement is in addition to any Underground Services Alert notifications. The City will then mark the underground traffic signal facilities.

The Contractor shall not proceed with any grinding, trenching or other underground work until it has been verified with the Inspector that signal facilities have been marked.

8.k
February 27, 2023

Packet Pg. 335

General Provisions 2023 Sewer System Root Foaming Project Page P-48 Project No. C1752-23
In the event that the Contractor's construction activities cause any failure of a traffic facility, it shall be repaired and be made fully operable within 24-hours of the damage occurring. In the event that such repair is not undertaken within this time limit, the City may repair the facility at the Contractor’s expense.

9.17 Restoration of Adjacent and Existing Improvements - Contractor shall do all cutting, fitting, or patching of the work required to make all parts of the work come together properly with existing and adjacent conditions.

Unless otherwise provided, the Contractor shall repair or replace all existing improvements (e.g., curbs, sidewalks, driveways, fences, signs, utilities, street surfaces, structures, etc.) damaged or removed as a result of his operations. Repairs and replacements shall be at least equal to existing improvements, and shall match in terms of condition, finish and dimension to the satisfaction of the Engineer.

All Underground Services Alert (USA) markings, including the initial markings made by the Contractor and those markings placed by others in responseshall be removed at the Contractor’s expense when they are no longer required. Acceptable means of removal include sand blasting, high pressure washing, or other means approved by the Engineer.

All traffic signs and street signs within the limit of work necessarily removed during the various phases of operations shall be temporarily reset by the Contractor at or near the original location upon completion of each phase of construction operations. Prior to removal of all traffic control signs, the Contractor shall submit photographs of the site which show the existing location of these signs so that upon completion the photographs will aid in resetting the signs at or near their original location. Traffic control signs and street signs will be replaced upon completion of the work and the cost of removal and replacement shall be considered as part of the contract bid items, and no separate payment will be made thereof.

Rural type mail boxes shall be maintained by the Contractor in a manner satisfactory to the property owner and postal service, and the Contractor shall relocate the same as soon as possible to a permanent location in accordance with postal regulations and in a location acceptable to the property owner.

Any object to be removed and reused at other locations shall be removed with due care and delivered or stored at the project’s construction storage area, or if approved by the Engineer, at any other site designated by the Engineer within the City. Such objects may consist of street light poles, signal mast arms and other objects directed by the Engineer. Items not approved by the Engineer for reuse purposes, and without salvage value, shall become the property of the Contractor, to be disposed of at Contractor expense, in an acceptable manner.

9.18 Archeological Remains - If human and/or archeological remains are uncovered during excavation. All earthwork within one-hundred (100) feet of these materials will be stopped until a Coroner and/or professional archeologist (SCA) and/or the Society of Professional Archeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures.

9.19 Access to Private Property - The Contractor shall schedule and perform operations so as to minimize disruption of access to private property. Prior to blocking access to any private driveway or parking lot entrance, the Contractor shall notify the residents, business owners or tenants of pending closure and allow residents to remove vehicles. During non-working hours no driveway, house or parking lot shall be denied access to a public roadway.

The Contractor shall coordinate with the adjacent p roperty owners and businesses and maintain vehicle and pedestrian access to their properties at all times. Temporary access ramps, fencing, or o ther measures shall be provided as needed.

9.20 Traffic Control and Public Convenience – The Contractor shall provide for safe movement of all vehicular, bicycle and pedestrian traffic through and around the construction operations with as little inconvenience and delay as possible. The Contractor shall have no amount of work under construction other than what he can properly prosecute with due regard to the rights and convenience of the public.

8.k
February 27, 2023

Packet Pg. 336

General Provisions 2023 Sewer System Root Foaming Project Page P-49 Project No. C1752-23
Proper conveyance of vehicular traffic and pedestrians through the work area depends upon navigating under unexpected situations. The means of clarifying such conditions to the public include the Contractor’s use of signs, flagmen, pavement markings, barricades, lights, cones and delineators. No one standard sequence of signs or control devices will suit all conditions which may result from construction operations. Even for the same work, the conditions may vary from hour to hour, requiring adjustment and revisions of the traffic control in effect. The traffic control requirements specified herein are therefore intended to establish general principles to be observed in the control and regulation of traffic through and around the construction operations anticipated for this project. The requirements set forth in this Section represent the minimum traffic control requirements imposed and the Contractor shall be solely responsible for providing the full extent of traffic control measures that are necessary. Only individuals trained in the principles of implementing traffic control and/or traffic control flagging shall be assigned that responsibility at the work site.
(a) Traffic Control Plan – The Contractor shall submit a Traffic Control Plan to clearly describe proposed traffic control measures. The plan shall be generally in accordance with the illustrations included in the “California Manual of Uniform Traffic Control Devices” and the “Work Area Traffic Control Handbook”, (Building News Incorporated P.O. Box 3031, Terminal Annex, Los Angeles, CA 90051). The submittal shall consist of scaled drawings for each situation anticipated to be encountered, i.e., intersections, mid-block (each during working and non-working hours), etc. The drawings shall show signs, traffic control devices and flagmen as required.

The Traffic Control Plan shall be directed equally to the regulation and protection of non- vehicular traffic including pedestrians, bicyclists, joggers, skaters, skateboarders, etc. The Contractor shall provide for the protection and separation of non-vehicular traffic from construction operations at all times. No work involving the implementation of traffic control shall begin until the Engineer has reviewed and has no exception to the traffic control plans.

The Contractor may implement a revised Traffic Control Plan only with subsequent review with no exceptions by the Engineer.
(b) Traffic Control Devices - Traffic control devices shall be provided in sufficient quantities and types as required to provide safe and adequate traffic control. During hours of darkness, approved lights and/or flares shall be included, in proper working order, to illuminate signs and hazards and alert approaching traffic. Barricades shall be furnished and maintained along all open trenches in contact with traffic. No work may begin on any day or at any time before traffic control devices have been placed, test driven and, if required, adjusted and revised. All traffic control devices shall be placed in accordance with the Manual of Uniform Traffic Control Devices and the Contractor’s favorably reviewed traffic control plans. Locations of devices shall be adjusted to suit the conditions and circumstances of each detour situation. In all cases, signs shall be placed to most effectively convey their messages to approaching traffic.

The Contractor shall maintain all traffic control devices, at proper locations and in proper working order, at all times during construction operations and whenever a hazard resulting from Contractor’s operations exists. The Contractor shall adjust and revise traffic control devices, placement, etc., to suit changing conditions around construction operations.

Traffic control devices shall remain in place at all times, as required to alert approaching traffic of upcoming hazards. After hazards have been removed, all traffic control devices shall be removed. Temporary signs shall be removed or their messages covered.

Daily traffic control measures shall continue until cleanup activities have been satisfactorily completed and all of the Contractor’s equipment has been removed from the traveled way. (c) Traffic Control Detours - The Contractor shall direct, divert and detour traffic through, around and adjacent to construction operations in accordance with the traffic control plans specified in the Contract Documents or in accordance with the Contractor’s favorably reviewed traffic control plans.

1. Field Review of Detours - Immediately after traffic control devices have been placed, the detour shall be test driven by the Engineer or Inspector and the

8.k
February 27, 2023

Packet Pg. 337

General Provisions 2023 Sewer System Root Foaming Project Page P-50 Project No. C1752-23
Contractor’s Superintendent. The test drive shall include approaches to the detour from each possible direction, and traverse the full length of each detour route. The Contractor shall adjust and revise all traffic control devices as determined to be required by the test drive and the test drive shall be repeated, if determined necessary by the Engineer or Inspector. The Contractor shall provide additional traffic control devices as required to maintain the flow of traffic throughout construction operation.

2. Diverting Bicycle and Pedestrian Traffic – Whenever construction operations obstruct the flow of bicycle and pedestrian traffic or present a hazard to bicycles and pedestrians, the Contractor shall take appropriate action to protect and separate bicycles and pedestrians from the work area. Such action may include placement of barricades between bicycles and pedestrians and the work areas, placement of warning signs, and provisions utilizing personnel as required to protect and maintain access for bicycles and pedestrians as conditions warrant.

3. Diverting Vehicular Traffic - Whenever construction operations obstruct the flow of vehicular traffic or present a hazard to vehicles operating in the vicinity of construction operations, the Contractor shall take appropriate action to warn, detour and otherwise protect approaching drivers and vehicles.

4. Flagmen - The Contractor shall employ flagmen as required for each specific detour and at all locations where barricades and warning signs cannot control the movement of traffic. A warning sign shall be placed ahead of the flagman reading:
“Flagman Ahead.” The distance between the sign and the flagman should be based on the average traffic speed, allowing approximately fifty (50) feet for each ten (10) miles per hour. During hours of darkness, flagman stations shall be illuminated such that the flagman will be clearly visible to approaching traffic.

Lights for illuminating the flagman station shall receive favorable review by the Engineer. The flagman shall wear a red or orange warning garment when flagging.

Flagmen shall be provided with approved red flags or STOP/SLOW hand paddles, and two-way radios for communication. When flagging during hours of darkness, the flagman shall signal with a red light or flare and shall have a belt and suspender harness outside his garment fitted with reflectors or made from reflectorized cloth, unless the garment is well reflectorized in one of these ways.

5. Notice to Agencies - The Contractor shall notify the Engineer and all agencies having jurisdiction over the work, in writing, at least ninety-six (96) hours, excluding holidays and weekends, prior to instituting any lane closure or detour. At the end of each workday, the Contractor shall inform the Engineer, Police Department and Fire Departments of the status of all detours, lane restrictions, or road closures.

The Contractor shall cooperate and coordinate with the various parties involved in the collection and removal of trash and garbage, the transit providers, the U.S.

Postal Service, and others, as necessary, in order to maintain existing schedules and services.

6. Emergency Vehicle Access Through Detours - During all detours and/or street closures the Contractor shall provide for the movement of emergency vehicles through the work area. It is essential that the Contractor’s work and equipment does not impede emergency access.

7. Night Detours - The Contractor shall not be permitted to maintain any lane closure or road closure during non-working hours without first obtaining written approval from the Engineer. During non-working hours the Contractor shall restore travel lanes to their original alignment and configuration by means of placing temporary asphalt pavement or bridging with steel plates. The Contractor shall place “ROUGH ROAD” signs conforming to the Manual of Uniform Traffic Control Devices at uneven temporary pavement or bridging locations. See General Provisions, Section 9.18 (b), “Trench Safety Requirements”.

8.k
February 27, 2023

Packet Pg. 338

General Provisions 2023 Sewer System Root Foaming Project Page P-51 Project No. C1752-23

8. Temporary Traffic Lanes – Temporary traffic lanes shall be at least ten (10) feet wide, or eleven (11) feet wide around curves. Provide an additional two (2) feet of clearance from curbs. The length of temporary lanes should be limited to the area under construction and the distance necessary to divert traffic. (d) Parking Restrictions - The Contractor shall post approved “No Parking” signs at all locations necessary to establish work areas and detour traffic. Signs shall read: “NO PARKING - CONSTRUCTION TOW-AWAY ZONE,” show the actual day and hours of parking restriction and indicate the telephone number of the City’s Police Department or agency having jurisdiction. Signs shall be placed at least forty-eight (48) hours in advance of the restriction. The Engineer shall approve the location and duration of no parking limits and verify their placement. “No Parking” signs shall be removed when no work is under construction and must be reposted forty-eight (48) hours before the resumption of construction activities.

For any violation of “No Parking” signs by motorists, the Contractor shall contact and coordinate directly with the City’s Police Department for removal of vehicles in accordance with the California Vehicle Code. The Contractor shall also coordinate with the Police Department directly for enforcement and towing of parked vehicles.

9.21 Safety - The Contractor shall be solely responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the performance of the work. The Contractor’s responsibilities shall specifically provide for the safety of persons involved in the project, other persons who are affected by the performance of the work, the work in place, materials and equipment to be incorporated in the work, the project site, and adjoining property.

The services of the City in conducting inspection or construction review of the Contractor's performance is not intended to include review of the adequacy of the Contractor's work methods, equipment, bracing, shoring or scaffolding, or safety measures, in, on, or near the construction site.

Safety vests and personal protection equipment shall be worn by the Contractor, all subcontractors and other personnel when working or present on the site. Hard hats shall be worn when working around earthmoving or any heavy construction equipment or during any overhead construction work.

Payment for performing all work necessary to provide safety measures shall be included in the bid items for which safety measures are required and no additional compensation will be made. (a) Safety Orders – The Contractor shall have at the work site, copies or suitable extracts of:

Construction Safety Orders, Tunnel Safety Orders, and General Industry Safety Orders issued by the State Division of Industrial Safety. The Contractor shall comply with provisions of these and all other applicable laws, ordinances, and regulations. (b) Trench Safety Requirement - As required by California Labor Code, Section 6705 and in addition thereto, for any excavation of any trench or trenches five (5’) feet or more in depth, the Contractor shall submit to the Engineer for review, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. Structural calculations prepared, stamped and signed by a Registered Engineer licensed to practice in the State of California shall accompany the plan to verify the structural safety and adequacy of the sheeting, shoring and bracing to be used on the project. No such plan shall allow any shoring, sloping or a protection system less effective than that required by the Construction Safety Orders of the State Division of Occupational Safety and Health.

The maximum length of open trench shall be three-hundred (300) feet or the distance that pipe can be installed in a single day as determined by the Engineer. Trenches shall be backfilled and covered with two (2) inches of cutback (in paved areas) or bridged with tack- welded steel plates at the end of each workday. Cutback shall be placed around plate edges to provide a smooth transition and to secure against displacement.

8.k
February 27, 2023

Packet Pg. 339

General Provisions 2023 Sewer System Root Foaming Project Page P-52 Project No. C1752-23
As soon as possible under the provisions of these specifications, the Contractor shall backfill all excavations and restore to usefulness all improvements that existed prior to the start of construction.
(c) Confined Space Entry Program (CSEP) - Entry into permit-required confined spaces as defined in Section 5157, Title 8, California Code of Regulations (CCR) may be required as a part of the work. All manholes, tanks, vaults, pipelines, excavations, or other enclosed or partially enclosed spaces shall be considered permit-required confined spaces until the pre-entry procedures demonstrate otherwise. The Contractor shall be responsible for implementing, administering, and maintaining a confined space entry program (CSEP) in accordance with Sections 5156, 5157, 5158, Title 8, CCR and shall implement such a program prior to performing any work in a permit-required confined space. A copy of the permit shall be available at all times for review by the Contractor and City personnel at the work site.

Prior to starting work, the Contractor shall prepare and submit its comprehensive CSEP to the Engineer. The CSEP shall address all potential physical and environmental hazards and contain procedures for safe entry into confined spaces, including, but not limited to the following:

1. Training of personnel

2. Purging and cleaning the space of materials and residue

3. Potential isolation and control of energy and material inflow

4. Controlled access to the space

5. Atmospheric testing of the space

6. Ventilation of the space

7. Special hazards consideration

8. Personal protective equipment

9. Rescue plan provisions
The Contractor’s CSEP submittal shall also include the names of the Contractor’s and Subcontractor’s personnel assigned to the project who will have CSEP responsibilities, their CSEP training, their specific assignment and their responsibilities in carrying out the CSEP.

Payment for implementing, administering, and providing all equipment and personnel associated with the CSEP shall be included in the bid items for which the CSEP is required and no additional compensation will be made.
(d) Hazardous Conditions: Contractor’s Responsibility for Precautions - Contractor agrees that if, during the progress of the work, a hazardous condition is identified which involves a risk of bodily harm to any person or a risk of damage to any property, the Contractor will take such special precautions as shall be necessary to make the progress of the work safe under such condition. Conditions may result from, but are not limited to, the use of specified materials or equipment, the location of the work, the condition of the site, the kind or method of construction, or the manner in which any of the work is required to be done.

The Contractor agrees to assume the sole responsibility for determining whether any such hazardous condition exists or will be created during the course of the work. (e) Use of Explosives – Explosives may be used only when authorized in writing by the Engineer, or as otherwise stated in the Specifications. Explosives shall be handled, used, and stored in accordance with all applicable regulations. No explosive material shall be transported to, stored or utilized on the site without written permission of Engineer. All blasting work and handling of explosives on the site shall be done only by qualified persons who possess a valid permit. The Engineer’s approval of the use of explosives shall not relieve the Contractor from liability for claims caused by blasting operations.

8.k
February 27, 2023

Packet Pg. 340

General Provisions 2023 Sewer System Root Foaming Project Page P-53 Project No. C1752-23
(f) Special Hazardous Substances and Process – Materials that contain hazardous substances or mixtures may be required on the work. A Material Safety Data Sheet as described in California Code of Regulations, Section 5194 shall be requested by the Contractor from the manufacturer of any hazardous products used and submitted to the Engineer.

Hazardous material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer warnings and application instructions listed on the Material Safety Data Sheet and on the product container label.

The Contractor shall notify the Engineer if a specified product cannot be used under safe conditions.

9.22 Patent Fees or Royalties -
All fees, royalties or claims for any patented invention, article or method that may be used upon or in any manner connected with the work under this contract shall be included in the price bid for the work and the contractor and his sureties shall protect and hold the City, together with all the City's officers, agents, servants and employees, harmless against any and all demands made for such fees or claims brought or made by the holder of any invention or patent and, before the final payment is made on account of this contract, contractor shall, if requested by the Engineer, furnish acceptable proof of a proper release from all such fees or claims.

Should the contractor, his agents, servants or employees, or any of them, be enjoined from furnishing or using any invention, article, material or appliance supplied or required to be supplied or used under this contract, the contractor shall promptly substitute other articles, materials or appliances, in lieu thereof, of equal efficiency, quality, finish, suitability and market value and satisfactory in all respects to the Engineer. Or, in the event that the Engineers elects in lieu of such substitution to have supplies and to retain and use any such invention, article, material or appliance as may be required by the contract to be supplied – in that event, the contractor shall pay such royalties and secure such valid licenses as may be requisite and necessary for the City, the City's officers, agents, servants and employees, or any of them to use such invention, article, material or appliance without being disturbed or in any way interfered with by any proceeding in law or equity on account thereof. Should the contractor neglect or refuse to make the substitution promptly, or to pay such royalties and secure such licenses as may be necessary, then, in that event, the Engineer shall have the right to make such substitution or the City may pay such royalties and secure such licenses and charge the cost thereof against any monies due the contractor from the City or recover the amount thereof from him and his sureties notwithstanding final payment under this contract may have been made.

9.23 Advertising - The names of the Contractor or Subcontractors, with their addresses and the designation of their particular specialties, may be displayed at the job site on removable signs only if written approval is received from the Engineer. Commercial advertising material shall not be attached to, or painted on the surfaces of, any buildings, fences, canopies, or barricades.

9.24 Antitrust Claims – Attention is directed to Public Contract Code, Section 7103.5 which provides: “In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or Subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec 15) or the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or subcontract. The assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgement by the parties.”

9.25 Audit and Examination of Records – The City and entities and agencies designated by the City, shall have access to, and the right to audit and examine at no additional cost, all of the Contractor’s project related data including but not limited to, books, estimates, records, contracts, bid cost data, Subcontractor and supplier job cost data, change orders, correspondence, instructions, drawings, receipts, vouchers, purchase orders, notes, computations, daily logs, and memoranda relating to the work. Pursuant to Government Code, Section 8546.7, the Contractor shall preserve all such records and will be subject to

8.k
February 27, 2023

Packet Pg. 341

General Provisions 2023 Sewer System Root Foaming Project Page P-54 Project No. C1752-23
examination and audit by the State Auditor, at the request of the City, for a period of three (3) years after final payment under the Agreement.

9.26 Notice of Entrance - Before entering any private property the contractor shall give the owner, tenant and inspector a minimum of forty-eight (48) hours written notice.

9.27 Additional and Emergency Protection - Wherever, in the opinion of the Engineer, the contractor has not taken sufficient precautions for the safety of the public or the protection of the works to be constructed under this contract, or of adjacent structures or property which may be injured by processes of construction on account of such neglect, and whenever, in the opinion of the Engineer, an emergency shall arise and immediate actions shall be considered necessary in order to protect personal and property interest, whether public or private, then and in that event, the Engineer, with or without notice to the contractor, may provide suitable protection to the said interests by causing such work to be done and such material to be furnished as shall provide such protection as the Engineer may consider necessary and adequate.

The cost and expense of such work and material so furnished shall be borne by the contractor and if the same shall not be paid on presentation of the bills therefore, then such costs shall be deducted from any amounts due or to become due the contractor. The performance of such emergency work under the direction of the Engineer shall in no way relieve the contractor from any damages which may occur during or after precaution has been taken by the Engineer.

9.28 Placing Portions of Work in Service - Portions of the work may be placed in service as completed if desired by the City. Contractor shall give proper access to the work for this purpose. Such use and operation shall not constitute an acceptance of the work and the work, and the contractor shall be
liable for defects due to faulty construction until the entire work under the contract is finally accepted.

9.29 Rights-of-Way - The City will provide all rights-of-way and easements in or beneath which pipes and other structures will be constructed by the Contractor under this contract. If through the failure of the City to acquire or clear title to rights-of-way, the Contractor sustains loss which could not have been avoided by the judicious handling of forces and plant, there shall be paid to the contractor such amount as the Engineer may find to be a fair and reasonable compensation for such part of the Contractor's actual loss as the Engineer deems unavoidable. Actual loss shall be understood to include no items other than necessary payments, idle time of men, idle time of equipment, cost of extra moving of equipment, and cost of longer hauls, with no allowance in any case for overhead or profit. If performance of the Contractor's work is delayed as a result of the failure of the City to acquire or clear title to rights-of-way, a commensurate extension of time will be granted.

8.k
February 27, 2023

Packet Pg. 342

General Provisions 2023 Sewer System Root Foaming Project Page P-55 Project No. C1752-23
SECTION 10 - MEASUREMENT AND PAYMENT

10.01 Measurement of Quantities for Unit Price Work - Materials and items of work which are to be paid for on the basis of measurement shall be measured in accordance with the methods stipulated in the particular sections of the Contract Documents involved . Unless specifically stated otherwise in this contract, no extra measurement(s) according to local custom of any kind shall be allowed in measuring the work under this contract; only the length, area, solid contents, number, weight, or time in standard units, as the case may be, shall be considered as specified.

Unless otherwise specified, quantities of work shall be determined from measurements or dimensions in the horizontal planes. Stationing shall be along the street centerline, lengths of sanitary sewers, storm drains and water lines shall be measured as the horizontal distances from center to center of structures, rounded to the nearest foot, and lengths of all return radii and curb data shall be measured along the face of curb. Volumetric quantities shall be the product of the mean area of vertical or horizontal sections and the intervening horizontal or vertical dimensions. Measurements shall be in accordance with U.S. Standard Measures. A pound is an avoirdupois pound. A ton is two-thousand (2,000) pounds avoirdupois. The unit of liquid measure is the U.S. gallon.

When payment is to be made on the basis of weight, the weighing shall be done on certified platform scales or, when approved by the Engineer, on a completely automated weighing and recording system.

The Contractor shall submit to the Engineer with duplicate licensed Weighmaster’s certificates showing the actual net weights. The City will accept the certificates as evidence of the weights delivered.

10.02 Bid Items - Should any bid item be eliminated in its entirety, payment will be made to the Contractor for actual costs incurred, in connection with such eliminated contract work, and for costs incurred prior to the date of the Engineer’s written notification eliminating such work. The actual costs to be paid to the Contractor shall be computed in the same manner as if the work were to be paid on a force account basis. No compensation will be made to the Contractor, in any case, for loss of anticipated profits.

Increased or decreased scope involving a change order will be paid as stipulated in the change order.

The estimated value of work performed, for lump sum bids or lump sum bid items will be determined from the schedule of values, to be prepared by the Contractor and presented at the preconstruction meeting. Elements of work on the schedule of values shall be separated into groupings appropriate for the project. The Technical Specifications may be used as a guide for establishing these groupings. Move-in costs, bond and insurance costs, and submittal preparation costs can be included in the schedule of values under a separate mobilization line item. This line item shall not exceed five-percent (5%) of the contract’s value. Overhead and profit shall not be allowed as a line item, but shall be prorated over other items of work.

10.03 Bid Quantities - The quantities listed in the Bid Schedule for each bid item do not govern final payment. Payments to the Contractor will be made only for the actual quantities of contract items constructed in accordance with the plans and specifications. If upon completion of the construction, the actual quantities show either an increase or decrease from the quantities given in the bid schedule, the contract unit prices will still prevail.

Payment will not be made for materials wasted or disposed of in a manner not called for under the contract. This includes rejected material not unloaded from vehicles, material rejected after it has been placed and material placed outside of the plan lines. Unless otherwise provided, no payment will be made for materials delivered to the site but not incorporated in the work. Such quantities will not be included in the final pay quantities. No compensation will be allowed for the disposal of rejected or excess material.

When the estimated quantity for a specific portion of work is designated on the Bid Schedule as a “Final Pay Quantity”, the estimated quantity specified shall be the final quantity for which payment for such specified portion of the work will be made, regardless of the actual quantity constructed, unless the

8.k
February 27, 2023

Packet Pg. 343

General Provisions 2023 Sewer System Root Foaming Project Page P-56 Project No. C1752-23
dimensions of said portions of the work shown on the plans are revised by the Engineer. If such dimensions are revised and such revisions result in an increase or decrease in the quantity of such work, the final quantity for payment will be revised by the amount represented by the change. The estimated quantity for any portion of the work designated as a Final Pay Quantity shall be considered as approximate only and no guarantee is made that the quantity, which can be determined by computations, based upon the details and dimensions shown on the plans, will equal the estimated quantity. No allowance will be made in the event that the quantities based upon computations do not equal the estimated quantities. Final pay quantities will be designated on the Bid Schedule with the letter (F) and shall only apply to the corresponding portions of work specifically designated on the plans. Any portion of work not designated as a final pay quantity will be measured and paid for as specified under other provisions of the Contract Documents.

10.04 Progress Payments – On or about the 25 th day of each month may be designated as the date which would terminate each working month for the purpose of making progress payments.

The Contractor's request for a progress payment shall be submitted under cover of the Request for Progress Payment form approved by the Engineer. The Request for Progress Payment form shall be complete and properly executed by the contractor, and have, as attachments, the items listed on the form.

The Contractor shall, on the date established, prepare and submit a progress estimate to the City for work accomplished during the previous working month, based on the various contract bid items and the unit bid prices. Invoices shall include amounts previously paid, itemized retention and any deductions or additions authorized by change order. Consultation with the Engineer may be necessary to determine the amount of work accomplished.

The first progress payment will not be made until the following submittals have been provided and accepted: list and schedule of submittals, Baseline Construction Schedule, schedule of values (if applicable), SWPPP. Subsequent progress payment requests will not be accepted unless accompanied by the progress payment cover letter, an updated baseline or revised schedule, a certification that the record drawings have been updated as of the date of the invoice.

Upon receipt of a progress payment request, the City shall, within ten (10) working days, determine if the request is proper, and if disputed the City will return the progress payment to the Contractor along with a written document setting forth the progress payment request’s shortcomings. Following receipt of an undisputed and properly submitted progress payment request, the City shall authorize payment within thirty (30) calendar days.

Contractor may request partial payment for materials delivered to the site but not yet incorporated into the work (materials on hand). To receive consideration for payment of materials on hand, the Contractor shall provide the Engineer with a list of such materials at least five (5) working days prior to submitting the monthly estimate of amount earned for work completed. At the Engineer’s sole discretion, up to seventy-five-percent (75%) of the estimated value of materials on hand may be considered for payment, subject to the following:
(a) Only materials which have received favorable review of shop drawings will qualify. (b) Eligible materials must be delivered and properly stored, protected, and maintained in a manner favorably reviewed by the Engineer, at the job site or at a bonded warehouse. (c) The Contractor's actual net cost for the materials must be supported by paid invoices to suppliers or other documentation requested by the Engineer. (d) Materials delivered to the site less than thirty (30) days prior to their scheduled incorporation in the work shall not qualify.
(e) Partial payments for materials on hand shall not be deemed to be final payment for the material nor relieve the Contractor of his obligations under the Contract. (f) Partial payments for materials on hand shall be subject to retention.

8.k
February 27, 2023

Packet Pg. 344

General Provisions 2023 Sewer System Root Foaming Project Page P-57 Project No. C1752-23
From each progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder of the amount due, less the amount of all previous payment will be paid to the Contractor provided all work invoiced has been completed and approved by the Engineer.

The Engineer may withhold or nullify, the whole or any part of any payment to such extent as may be necessary to protect the City from loss on account of any of the following:
(a) Defective or vandalized work not remedied,
(b) Damage to the City or another Contractor,
(c) Claims filed, or reasonable evidence indicating probable filing of claims, (d) Stop notices, or failure of the Contractor to make payments properly to subcontractors or laborers or suppliers, in which case 125% of the stop notice amount shall be withheld until a release form is received,
(e) A reasonable doubt that the contract can be completed for the balance unpaid, (f) Reasonable evidence that the work will not be completed within the contract time and that the unpaid balance of the contract sum would not be adequate to cover the City’s liquidated damages assessed in accordance with the Agreement for the anticipated delay, (g) Failure of Contractor to maintain, update and submit record documents, schedules or other submittals as required by the Contract Documents,
(h) Performance of work by Contractor without properly processed shop drawings; (i) Any other failure of Contractor to perform its obligations under the Contract Documents.

The Contractor may elect to receive one hundred percent (100%) of payments due under the contract from time to time, without retention of any portion of the payment by the City, by depositing and maintaining securities of a value equivalent to the retention amount with the City in accordance with the provisions of Public Contract Code, Section 22300. Such securities, if deposited by the Contractor, shall be valued by the City’s Administrative Services Director, whose decision on valuation of the securities shall be final.

Contractor warrants that, upon submittal of an application for payment, all work for which payment has been previously issued by the City and received by the Contractor, shall be free and clear of all claims, stop notices, security interests, and encumbrances in favor of Contractor, Subcontractors, or other persons or firms entitled to make claims by reason of having provided labor, materials, or equipment relating to work.

The payment of progress payments by the City shall not be construed as an absolute acceptance of the work done up to the time of such payments and shall not constitute acceptance of defective work.

10.05 Retentions - The City shall retain five percent (5%) of the amount of each progress estimate, and the accumulation of said amounts so retained from the progressive payments to the extent unencumbered will be paid to the contractor in no less than thirty-five (35) days after the completion and acceptance by the Engineer and the City of the work done.

Upon contractor's request, City will make payment of funds withheld from progress payments pursuant to the requirements of Code Section 14402 if contractor deposits in escrow with the City, or with a bank acceptable to the City, securities eligible for the investment of State funds under Government Code Section 16430 or bank or savings and loan certificates of deposit, upon the following conditions:
(a) Contractor shall bear the expense of the City and the escrow agent in connection with the escrow deposit made.

8.k
February 27, 2023

Packet Pg. 345

General Provisions 2023 Sewer System Root Foaming Project Page P-58 Project No. C1752-23
(b) Securities or certificates of deposit to be placed in escrow shall be of a value at least equivalent to the amounts of retention to be paid to the contractor pursuant to this section. (c) Contractor shall enter into an escrow agreement satisfactory to the City, which agreement shall include provisions governing inter alia:

1. Amount of securities to be deposited.

1. Providing of powers of attorney or other documents necessary for the transfer of the securities to be deposited.

2. Conversion to cash to provide funds to meet defaults to termination of the contractor's control over the work, stop notices filed pursuant to the law, assessment of liquidated damages or other amounts to be kept or retained under the provisions of the contract.

3. Decrease in value of securities or deposit.

4. Termination of the escrow upon completion of the contract. (d) Contractor shall obtain the written consent of the surety to such agreement.

10.06 Final Payment - The City shall, prior to final acceptance, provide the Contractor with a copy of the final quantities for the various contract bid items and a summary of contract change orders for his review. All prior payments shall be subject to correction in determining the total contract sum. The Contractor shall reply promptly in writing, to indicate either his concurrence or an explanation of possible discrepancies in the total contract sum.

The project will not be submitted to the City Council for acceptance until the Engineer and the Contractor concur with the totals of all quantities, costs, contract change orders and the total contract sum.

Following concurrence, a semi-final payment will be made to the Contractor after deducting all previous payments and all amounts to be retained under the provisions of the contract. The retention payment shall be due and payable as a final payment after the expiration of thirty-five (35) days following the date of final acceptance of the work by the City Council.

If within the time fixed by law, a properly executed notice to stop payment is filed with the City, due to Contractor’s failure to pay for labor or materials used in the work, all money due for such labor or materials will be withheld from payment to the Contractor in accordance with applicable laws.

If releases are required, the Contractor shall pay or cause to be paid to Subcontractors the amount stated in the conditional releases within five (5) days after receipt of the semi-final payment, and shall promptly thereafter furnish evidence of such payment to the City.

The securities deposited by the Contractor will be released, providing that the following requirements of the contract have been fulfilled:
(a) Satisfactory completion of all construction work and written acceptance of said work by the City;
(b) The submission by the Contractor to the Engineer of all required stop notice releases, submittals, written guarantees, warranties, operating manuals, and other project related documentation;
(c) The return to the Engineer of all drawings and written specifications loaned to the Contractor during the construction period.
(d) The submission by the Contractor to the Engineer of record documents and a set of red- lined drawings showing the revisions to the original set of drawings which reflect the actual construction of the project for preparation of “Record Drawings”.

8.k
February 27, 2023

Packet Pg. 346

General Provisions 2023 Sewer System Root Foaming Project Page P-59 Project No. C1752-23
The Contractor agrees that the payment of the final amount due under the contract shall release the City of San Carlos from any and all claims or liability on account of all work performed under the contract, except those items previously made in writing and identified by the Contractor as unsettled. Release of the final payment by the City shall not be construed as an acceptance of any defective work or acceptance of improper materials.

10.07 Acceptance - Contractor shall notify Engineer in writing of the completion of the work, whereupon the Engineer shall promptly satisfy them self by personal inspection as to the actual completion of the work in accordance with the terms of the contract. After receiving a written recommendation from the Engineer for acceptance of the work, City shall accept or reject the work; stating, if the work is rejected, the requisite conditions for acceptance. When the City accepts the work, they shall file a Notice of Completion with the County Recorder in the county where the work is located and shall promptly notify the contractor in writing of the recordation. Contractor warrants and guarantees that title to all work, materials and equipment accepted by the City will pass to the City free and clear of all liens, claims, security interests or encumbrances, and that no work, materials or equipment accepted will have been acquired by the contractor, or by any other person performing the work at the site or furnishing materials or equipment for the project, subject to an agreement under which an interest therein or encumbrances thereon is retained by the seller or otherwise imposed by contractor of such other person.

10.08 Compensation for Extra or Omitted Work – Compensation for extra or omitted work shall be in accordance with Section 5.08, Change Orders.

10.09 Compensation to City for Extension of Time - In case the work called for under this contract is not completed within the time limit stipulated herein, the City shall have the right, as provided hereinabove, to extend the time of completion thereof. If the time limit so be extended, the City shall have the right to charge to the contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, administration, legal and other overhead expenses which are directly chargeable to the extension of time. The cost of final surveys and preparation of the final estimate shall not be included in such charges.

10.10 Claims - The term “Claim” shall mean a written demand or assertion by the Contractor seeking, as a matter of asserted right, adjustment in the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, or determination of other disputes or matters in question between the City and Contractor arising out of or related to the Contract Documents or the performance of the work, including claims alleging an error or omission.

A claim must be stated with specificity, including identification of the event giving rise to claim, the date of the event, and the asserted effect on contract sum and contract time. The claim shall include adequate supporting data. Adequate supporting data for a claim for an adjustment of the contract time shall include scheduling data demonstrating the impact of the event on the completion of the work.

Adequate supporting data for a claim for an adjustment of the contract sum shall include a detailed cost breakdown of the items allowed, isolating labor, material, and equipment costs, and providing detailed quantities and unit prices for changed work. If the exact amount of a claim is not ascertainable at the time such claim is made, the supporting data currently available shall be submitted. Supplemental data supporting the exact amount of the claim shall be submitted as soon as available.

Notwithstanding the making of any claim or the existence of any dispute regarding any claim, unless otherwise directed by the Engineer, the Contractor shall not cause any delay, cessation, or termination in the performance of the work, including portions of the work pertaining to a claim.

10.11 Time Limit on Claims - Contractor shall submit any and all claims, together with adequate supporting data to the Engineer as soon as possible but not later than ten (10) working days after occurrence of the event giving rise to the claim, or the date the Contractor first recognized, or reasonably should have recognized, the condition giving rise to the claim, whichever is earlier. Contractor hereby expressly waives all claims not made within this time limit.

8.k
February 27, 2023

Packet Pg. 347

General Provisions 2023 Sewer System Root Foaming Project Page P-60 Project No. C1752-23
Contractor is expressly barred from asserting any claims of which the Contractor was aware, whether or not the exact amount of such claims was ascertainable, that is not submitted to the Engineer prior to the Contractor proceeding with the work.

10.12 City Response to Claims - The Engineer shall promptly review claims. If additional supporting data is deemed necessary, the Engineer shall request such additional data within ten (10) working days after receipt of the claim. The Contractor shall furnish such additional data no later than ten (10) working days after receipt of the City’s request. The Engineer shall render a decision promptly, but in any event, within thirty (30) working days after the receipt of the claim or the receipt of additional supporting data. If the amount of the claim is in excess of $50,000, the aforesaid thirty (30) working day period shall be sixty (60) working days. Failure of the Engineer to render a decision within the aforesaid thirty (30) or sixty (60) working day period shall be deemed a decision denying the claim and the last day of such period shall be the date of such decision. The decision of the Engineer shall be final and binding unless appealed in accordance with the General Provisions, Section 10.15, “Appeal of the Engineer’s Decision”.

10.13 Appeal of Engineer’s Decision - If Contractor disputes the Engineer’s decision of a claim, the Contractor shall, within thirty (30) calendar days of the decision, make a written appeal of the decision to the Engineer. The written appeal shall include all supporting data upon which the Contractor requests the City to modify its decision, including all documentation transmitted between the Contractor and the Engineer on the underlying claim. The Engineer shall make a good faith effort to resolve the claim prior to final completion of the Project. In the event the claim is not resolved prior to final completion, the Contractor’s claim shall be heard by the Director of Public Works prior to recommending final acceptance to the City Council. The Contractor’s administrative remedies under the Contract Documents shall be exhausted after the decision of the Director of Public Works is rendered. In case of disagreement with the decision of the Director of Public Works, the Contractor may pursue the resolution of the dispute by presenting a formal claim to the City.

8.k
February 27, 2023

Packet Pg. 348

General Provisions 2023 Sewer System Root Foaming Project Page P-61 Project No. C1752-23
SECTION 11 - GUARANTY

11.01 Contractor’s Guaranty - Prior to final acceptance, the Contractor shall warrant and guaranty to the City that all work is in accordance with the Contract Documents and is not defective.

The guaranty shall be accompanied by a warranty bond for ten percent (10%) of the final contract sum, which shall warrant the quality of the work for a period of two (2) years after acceptance. The guaranty and warranty bond shall be in accordance with the Agreement Forms furnished in the Contract Documents.

11.02 Correction of Defective Work During the Guaranty Period - If within two (2) years after the date of City Council acceptance, or such longer period of time as may be prescribed by laws or regulations or by the terms of any applicable special guaranty required by the Contract Documents, any work is found to be defective, the Contractor shall promptly without cost to the City and in accordance with the City’s written instructions, either correct such defective work or if it has been rejected by the City, remove it from the site and replace it with non-defective work.

If the Contractor does not promptly comply with the terms of such instructions within ten (10) working days after written demand by the City, the City may have the defective work corrected. The City may also correct defective work immediately in cases of emergency where delay would cause serious risk of loss or damage. All direct, indirect and consequential costs of correcting defective work (including but not limited to fees and charges of engineers, architects, attorneys and other professionals) shall be absorbed by the Contractor.

The Contractor shall remove from the Project site portions of the work and materials which are not in accordance with the Contract Documents and which are neither corrected by the Contractor nor accepted by the City. If Contractor fails to pay the costs of such removal within ten (10) working days after written demand, the City may, without prejudice to other remedies, sell such materials at auction or at private sale, or otherwise dispose of such material. The Contractor shall be entitled to the proceeds of such sale, if any, in excess of the costs and damages for which the Contractor is liable to the City, including reasonable attorneys’ fees and expenses and compensation for the City’s services and expenses.

The City shall have the option, at its sole discretion and by notice to the Contractor, to accept defective work as defined in Section 4.18 – “Acceptance of Defective Work. “

8.k
February 27, 2023

Packet Pg. 349

SPECIAL PROVISIONS

8.k
February 27, 2023

Packet Pg. 350

This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 351

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-1 Project No. C1752-23

SPECIAL PROVISIONS
These Special Provisions contain project specific requirements pertaining to the work, and as such, shall take precedence over the General Conditions portions of these Specifications. All costs associated with satisfying the requirements in these Special Provisions shall be included in the Contractor’s bid price and no additional compensation shall be made.

1. DESCRIPTION OF WORK
In general, the Contractor shall furnish all labor, materials, equipment, and services necessary to complete the project as further described in the “Instructions to Bidders” of these Specifications.

2. LOCATION
Work to be done under this contract is at various locations within the City of San Carlos.

3. DAYS & HOURS OF OPERATION
The Contractor shall restrict construction activities to the following hours:

Schedule of Working Hours within Public Right of Way
Construction Location Working Days Working Hours
Residential/Local and
Collector
Monday through Friday 8:00 a.m. to 5:00 p.m.

Downtown San Carlos Monday through Friday 8:00 a.m. to 11:30 a.m. and 1:30 p.m. to 4:00 p.m.

Arterial Monday through Friday 9:00 a.m. to 3:00 p.m.

No work shall be performed on Saturdays, Sundays, or designated legal holidays unless otherwise designated below.

Activities outside of those hours shall not generate objectionable noise, dust, or inconvenience to the public.

4. STAGING/CONSTRUCTION AREA
The City has not designated a staging area for this project. Should a staging area be desired, the Contractor shall be responsible for securing such an area along with any and all permits and permissions that may be necessary from the City and/or private property owners. Proof of concurrence shall be provided to the City upon request. Any fencing or other protective means (if required or employed by the Contractor) shall be at the contractor’s expense.

5. FURNISHED MATERIALS
The City will provide “NO PARKING” signs and the contractor shall arrange for the pick- up of these signs a minimum seven (7) calendar days prior to posting.

8.k
February 27, 2023

Packet Pg. 352

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-2 Project No. C1752-23

6. WATER
Water for use during construction shall be furnished by the Contractor and all costs incurred including the water use, meter charges, meter/backflow preventer deposit, vehicles and containers needed in transporting water to the job site shall be paid by the Contractor. The Contractor’s attention is directed to Section 9.11 of the General Provisions for additional information.

7. POWER
All power for and in connection with work to be done under this contract shall be furnished and maintained by Contractor. The Contractor’s attention is directed to Section 9.12(h) of the General Provisions for additional information.

8. OWNER/CONTRACTOR MEETINGS
A. PRE-CONSTRUCTION CONFERENCE: A Pre-construction Conference will be held on ZOOM within ten (10) working days after the date the Notice to Proceed is issued at the time and date described in the Notice to Proceed.

The conference will address the scope of work and t he Contractor's proposed construction schedule, traffic control and detour p lan. At the Pre-construction conference the Contractor shall provide the followi ng, in addition to the items specified in Section 8.09 of the General Provisions:
 The proposed construction schedule (for overall project),  Two-week look-ahead construction schedule,
 Draft of the notification letter to residents and merchants,  The proposed traffic control plan,
 Project submittals.

The meeting shall be attended by:
 Contractor's representative, superintendent and major subcontractors,  City's representative project manager and inspector,
 Design consultant team,
 Others as Appropriate.

B. WEEKLY CONSTRUCTION MEETINGS: A weekly construction meeting will be held at the construction site or on ZOOM as determi ned by the City Project Manager/Inspector. The weekly meetings will be held on a day and time mutually satisfactory to the City and Contractor’s representative and/or superintendent.

9. LICENSES AND PERMITS
The Contractor and all subcontractors shall obtain a business license from the City of San Carlos and shall hold current licenses for the craft that the business is contracting for as required by Federal, State and Local laws.

The Contractor shall apply for any required permits, including encroachment and tree removal permits from the applicable agencies (with copies of the form

8.k
February 27, 2023

Packet Pg. 353

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-3 Project No. C1752-23
and application submitted to the Engineer) within thirty (30) calendar days after the issuance of the Award of Contract Notification Letter and prior to beginning work in the affected areas. The Contractor shall submit copies of the permits, once issued, to the Engineer. No additional time schedule will be granted to the Contractor for any delays resulting from the processing of these permits.

A City of San Carlos “Encroachment Permit” is required. As a Contractor working for the City, no fee will be assessed to obtain an Encroachment Permit for this project.

If the construction work will require any street trees to be removed, Contractor shall obtain a “Street Tree Permit” from the City of San Carlos Department of Planning. Applications for Street Tree Permits are available by calling the Department of Planning at (650) 802-4263. It is the Contractor’s responsibility to obtain fee information updates by calling the City Department of Planning.

A City of San Carlos “Hazardous Materials Storage System Permit” may be required for various construction activities. The Contractor is responsible for verifying to the requirements and fee schedule for storage of diesel fuel and/or hazardous materials by contacting the San Carlos Fire Department at (650) 802-4300. It is the Contractor’s responsibility to follow any additional requirements as required by the 2016 California Fire Code.

10. SAFETY AND HEALTH REGULATIONS
The Contractor shall comply with all applicable occupational safety and health standards, rules, regulations and orders established by Federal and State Agencies.

Specific attention is directed also to OSHA safety rules, regulations and precautions to be taken by the Contractor before entering sanitary sewer manholes, and other sanitation structures with respect to physical and chemical hazards that may be present.

The area of work shall at all times be protected by means of an adequate number of cones, barricades, flags or whatever means is necessary to properly and safely protect both vehicular and pedestrian traffic.

Any condition deemed to be an unsafe condition shall be immediately corrected by the Contractor. The failure of the City or its representatives to bring a potentially dangerous situation to the Contractor's attention shall not relieve the Contractor from his responsibility for providing a safe work area.

The sanitary sewers in this contract convey sanitary sewage and certain substances that may be hazardous. These substances may include: hydrogen sulfide; a natural gaseous byproduct of sanitary sewage; sodium hydroxide (caustic soda); and ferrous and ferric chloride (iron chlorides), which may be

8.k
February 27, 2023

Packet Pg. 354

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-4 Project No. C1752-23
used to control odors in sewers. The Contractor shall exercise extreme caution and comply with all OSHA and CAL/OSHA requirements when working in the sewers or in the vicinity of hazardous substances.

All manhole entry shall be in compliance with the confined space entry requirements of CAL/OSHA, Santa Mateo County, and City of San Carlos.

Contractor shall coordinate emergency retrieval procedures with local emergency service providers.

The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and safety programs in connection with the work and ensures compliance to all applicable safety and health regulations of federal, state, and local agencies.

11. SAFETY OF PERSONS AND PROPERTY
The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damages, injury or loss to:

1. All employees, City personnel, residents on the project, and all others who may be affected thereby;

2. All the work and all materials and equipment to be incorporated therein, whether in storage on or off the site, under the care, custody or control of the Contractor or any of the Contractor’s subcontractors; and

3. The work of the City or other contractors.

The Contractor shall give all notices and comply with all applicable laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the safety of persons or property or their protection from damage, injury or loss.

The Contractor shall erect and maintain, as required by existing conditions and the progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, prom ulgating safety regulations, and notifying owners and users of adjacent utilities.

The Contractor shall designate a Site Safety and Health Officer who is a responsible member of the Contractor’s organization and whose duty shall be the prevention of accidents. The Contractor shall submit the name of the Site Safety and Health Officer to the Engineer in writing. The Site Safety and Health Officer shall be responsible for preparation of a Health and Safety Plan.

The Health and Safety Plan shall detail the Contractors safety committee(s), safety rules, safety training, enforcement procedures, incentives, accident procedures and investigations, inspections, safety equipment and maintenanc e, hazardous materials (i.e. asbestos pipe) handling procedures, eme rgency action plan(s), alcohol and drug policies, confined space entry procedures, certifica tion program

8.k
February 27, 2023

Packet Pg. 355

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-5 Project No. C1752-23
and emergency retrieval procedures, 911 and emergency rescue services withi n jurisdiction of the work area, health providers and hospital emergency near the work site.

12. NOTIFICATION OF RESIDENTS AND MERCHANTS:

The Contractor shall perform the following tasks prior to commencement of the construction work:

A. Prepare and leave at each location a notification letter fourteen (14) days and seventy-two (72) hours prior to the t ime of construction, stating nature of work and expected d uration of construction activity affecting their property.

B. Include Contractor's telephone number for the pur pose of taking inquiries and complaints.

C. Submit draft copy to City at Pre-construction con ference.

D. Final format and wording of this letter shall be subject to approval of Engineer.

13. STORM WATER POLLUTION PREVENTION
Consistent with the requirements of the federal Clean Water Act, the Project is subject to storm water pollution prevention requirements, which include the implementation of a water pollution prevention plan and/or implementation of local storm water requirements, which prohibit the discharge of pollutants from the Project site.

All work shall conform to the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ, NPDES No. CAS000002) ("General Permit"), and the NPDES Municipal Regional Stormwater Permit (MRP) (Order No. R2- 2015-0049, NPDES No. CAS612008). The Contractor shall implement all applicable San Mateo Countywide Water Pollution Prevention Program (SMCWPPP) measures and Best Management Practices (BMPs). Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations and/or a stop work order.

Prior to the start of any field work, the Contractor shall prepare a Water Pollution Control Plan (WPCP), in accordance with the latest version of the California Department of Transportation "Water Pollution Control Program (WPCP) Preparation Manual" and template, or other approved template, for review and approval by the Engineer. The WPCP shall include, at a minimum, the selection of BMPs applicable to the project, and an erosion control plan detailing the locations on the project site where applicable BMPs will be implemented.

The Contractor shall include in the WPCP any applicable California Department of Transportation Construction Site BMP Fact Sheets, or an approved equivalent. The

8.k
February 27, 2023

Packet Pg. 356

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-6 Project No. C1752-23
Contractor is responsible for furnishing, installing, constructing, inspecting, maintaining, removing, and disposing of the BMPs as necessary throughout the entirety of the project. The Contractor shall inspect BMPs regularly, and correct improperly installed, damaged, or ineffective BMPs immediately. Site BMP inspections shall be performed in accordance with the approved SWPPP/WPCP, and at a minimum of two week intervals.

Reports of each BMP inspection shall be provided to the City on a monthly basis.

14. CONSTRUCTION AND DEMOLITION DEBRIS
The City has an ordinance requiring that debris from construction and demolition activities be reused, recycled and/or salvaged and diverted from a landfill. The Contractor shall provide sufficient evidence (weight tickets or other documents) to verify that some of debris is being recycled, reused and/or salvaged to the satisfaction of the Engineer.

15. HAUL ROUTES
The section of Holly Street between Old County Road and Industrial Road is politically sensitive as a residential area and is NOT TO BE USED as a Haul Route. Contractor shall therefore direct trucks not to use the Holly and Highway-101 Interchange when heading to the site. Trucks leaving the site shall turn onto El Camino Real and head either north to Ralston Avenue or south to Brittan Avenue.

16. SANITATION FACILITIES
Contractor shall be responsible for providing bathrooms, wash stations and power, if needed. Sanitation facilities cannot be staged in the public right-of-way outside of working hours.

17. TRAFFIC CONTROL
Construction shall be organized so as to cause the least possible inconvenience to traffic.

Traffic control shall comply with the latest Caltra ns Standard Plans and traffic control devices shall be furnished, placed, and maintained in accordance with the latest version of Part 6, Temporary Traffic Control, of the California Manual on Uniform Traffic Control Devices (CA-MUTCD).

The Contractor shall provide all required signs, barricades, lights, high-level flag trees, arrow boards, and other devices.

The Contractor shall provide all required signs, barricades, lights, high-level flag trees, arrow boards, and other devices.

No work shall be performed on Saturdays, Sundays, o r designated legal holidays.

Exceptions may be made, at the Engineer’s discretion, to allow work at other times and on other days if required for the Contractor’s operations. In such cases, the Contractor shall have an alternate work schedule reviewed and authorized by the Engineer prior to commencement of work.

8.k
February 27, 2023

Packet Pg. 357

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-7 Project No. C1752-23
General Requirements:

1. The Contractor’s attention is directed to Section 9.20 of the General Provisions for additional requirements.

2. The Contractor shall submit a traffic control plan to the Engineer for review, including any requests for alternate work schedules or work hours:

3. No work may begin under contract until the Traffi c Control Plan has been approved by the Engineer. Time required for review and appro val of the Traffic Control Plan shall not constitute a basis for time extension.

4. The Contractor shall maintain temporary AC surface to provide safe and comfortable passage for pedestrian and vehicular traffic.

5. At the end of each day, all trench or access pit excavations shall be either backfilled in accordance with Section 1301-4, “Bedding and Backfill,” of these Technical Specifications, or covered with traffic rated non-skid steel plates. The steel plates shall be countersunk flush with the adjacent grade to provide a smooth surface if the plates are located within the traveled way of the road. Cutbacks shall be applied in gaps and/or at edges. Adjoining plates shall be tack-welded where the plates meet. Plates located outside of the traveled way shall be held in place by placing temporary asphalt around all edges.

6. The Contractor shall provide electric arrow board(s) for any lane closures and reductions, except for on residential streets.

Special Requirements:

1. The Contractor shall be responsible for providing and maintaining all temporary traffic control and safety devices, including all personnel necessary for effectively directing vehicular, pedestrian and bicycle traffic through the construction zone. The Contractor assumes sole and complete responsibility for the job and site conditions, including safety of all persons and property, from start until final acceptance of the project. This requirement shall apply continuously twenty-four (24) hours per day and shall not be limited to normal working hours.

2. Streets shall not be closed unless authorized by the Engineer in writing at least seventy-two (72) hours prior to the requested date. If street closure is approved, Contractor shall notify the following forty-eight (48) hours prior to the street closure:
a. City’s project manager and inspector
b. City of San Carlos Police Department, (650) 802-4277 c. City of San Carlos Fire Department, (650) 802-4300
d. City of San Carlos Garbage, Recycling, and Tree Trimming Haulers e. Recology San Mateo County (650) 595-3900
f. SamTrans
g. Arundel Elementary School
h. Carlmont High School

8.k
February 27, 2023

Packet Pg. 358

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-8 Project No. C1752-23
i. Tierra Linda Middle School
j. Impacted residents and businesses

3. If emergency or urgent street closures are required, the Contractor shall notify:
a. City’s project manager and inspector
b. City of San Carlos Police Department, (650) 802-4277 c. City of San Carlos Fire Department, (650) 802-4300

4. If construction will obstruct a bus stop, the Contractor shall notify the SamTrans Operations Control Center seventy-two (72) hours in advance at (650) 508-6200.

5. Access for local residents and businesses and all private property shall be maintained at all times. Signs shall be placed in front of commercial and industrial driveways to allow continual access. At the end of each working day these streets shall be reopened to through traffic with proper barricades, warning devices and temporary striping. If these streets are closed, the Contractor shall proceed expeditiously and with consideration for public convenience from the start of work to its completion.

19. CONSTRUCTION SCHEDULE
The Contractor shall submit to the Engineer, for review, a construction schedule in Critical Path Method (CPM) format with accompanying bar chart setting forth the sequence in which construction will proceed. In addition, the Contractor shall submit an updated CPM schedule for review along with the monthly request for partial payment.

The City may, at its sole discretion, withhold partial payment until an updated CPM schedule is submitted. The construction schedule must be created immediately upon award. The schedule must ensure that all improvements are completed prior to the start of the new school year.

20. DAILY WORK REPORTS
The Contractor shall provide the City Inspector with daily work reports at the beginning of each working day for a report of the previous working day. The form shall conform to that which is provided in Appendix A.

21. SUBMITTALS
The Contractor shall provide one electronic copy in PDF format of the construction submittals. Each submittal shall be numbered. Re-submittals shall include the original submittal number followed by a letter indicating the revision (i.e. “A” for the first revision, “B” for the second revision). Submittals shall be provided as required by the Contract Documents. The Contractor shall be responsible for conforming to the requirements of the specifications. The Contractor shall provide, at a minimum, the following submittals to the City within twenty (20) calendar days after the issuance of the Award of Contract Notification Letter and prior to beginning work.

8.k
February 27, 2023

Packet Pg. 359

Special Provisions 2023 Annual Sewer System Root Foaming Project Page SP-9 Project No. C1752-23
Each submittal item shall include a signed cover sheet, of which a template will be provided by the City. The cover sheet shall be filled out completely and legibly.

8.k
February 27, 2023

Packet Pg. 360

BID ITEM DESCRIPTIONS

8.k
February 27, 2023

Packet Pg. 361

This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 362

Bid Item Descriptions 2023 Sewer System Root Foaming Project Page B-1 Project No. C1752-23

BID ITEM DESCRIPTIONS
0-1.01 GENERAL
It is the intent of the Proposal and this Contract Document that the bid for each lump sum or unit price item, as submitted, and as required b y the Contract Documents. All costs in connection with the work, including labor, material s and equipment to fully complete the work, shall be included in the lump sum or unit price named in the Proposal. No item of work required by contract documents for proper and successful completion of the contract will be paid for in addition to the prices submitted in the Proposal. All work not specifically set forth in the Proposal as a pay item shall be considered a subsidiary obligation of the Contractor and all costs in connection therewith shall be included in prices shown in the Proposal.

Full compensation for conforming to the requirements in the Special Provisions (with the exception of Traffic Control) shall be considered as included in the contract prices paid for the various items of work involved and no separate payment will be made therefor. 0-1.02 MEASUREMENT AND PAYMENT
Lump sum bid items will be measured as a complete job, and are intended to cover payment for all work in connection with the item as indicat ed on the maps and as described throughout these specifications.

Unit price bid items will be measured as described in the bid schedule or specifications.

Bid items for this project are as follows:

Bid Item No. 1 - Mobilization & Demobilization
(Per Lump Sum)
Measurement and payment for this item shall be on a lump sum basis. The contract price for this bid item shall include full compensation f or obtaining all bonds, all Contractor- acquired permits, bonds, licenses, agreements, cert ifications, and public and agency notifications; submittal and approval of initial an d progress schedules and submittals; moving onto the site of all equipment, materials and staff including obtaining and setting up of Contractor’s staging area/yard; furnishing and erecting all needed construction facilities, fencing, and project signage; project security; demobilization; preconstruction photographs and video recording of surface features; progress schedules and reports; contract meetings; and record drawings.

Bid Item No. 2 – Traffic Control and Construction Area Signs (Per Lump Sum)
Measurement and payment for this item shall be on a unit basis per lump sum. The contract price for this bid item includes full compensation for preparing typical and/or detailed traffic control plans in accordance with the latest version of the California MUTCD and approved by the City of San Carlos. In addition, the contract price for this bid item shall include placing, adjusting and removing temporary traffic control measures, such as, but not limited to, flags, cones, barricades, crash barriers, signs, and flagg ers (personnel dedicated to controlling

8.k
February 27, 2023

Packet Pg. 363

Bid Item Descriptions 2023 Sewer System Root Foaming Project Page B-2 Project No. C1752-23

and managing traffic); traffic control signs both as required by the Contract Drawings and as part of the approved traffic control plan; and all incidentals necessary for worker, pedestrian and traffic protection, including furnishing all equipment, materials and personnel associated therewith, and in accordance with the Contract Documents. Traffic control shall be provided for all project work areas and shall be provided for the duration of the project.

Bid Items Nos. 3 through 8 – Apply Root Foaming Product to 4” through 15” Sewer Main
(Per Linear Foot)

Measurement and payment for this item shall be on a unit basis per linear foot. The contract price for this bid item shall include full compensation for furnishing all labor, equipment, back up equipment, tools, materials, appurtenances, and incidentals for doing all work necessary to apply chemical root control treatment of the sanitary sewer main segment ranging in size between 4-inches to 15-inches. Measurement of the actual number of linear feet treated shall be made from the center of the manholes.

END OF SECTION

8.k
February 27, 2023

Packet Pg. 364

TECHNICAL PROVISIONS

8.k
February 27, 2023

Packet Pg. 365

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-1 Project No. C1752-23
This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 366

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-1 Project No. C1752-23
SECTION 1 – ROOT FOAMING
PART 1 – GENERAL
The purpose of the project specified herein is to apply chemical root control agent to sanitary sewer mains and manholes, in order to kill the root growth present in the lines and to inhibit re-growth, without permanently damaging the vegetation producing the roots.

Contractor shall employ all precautions and handling requirements as recommended by the herbicide manufacturer and utilize adequate equipment on site.

Remove from the site all discharge resulting from the root foaming applications and dispose outside the City of San Carlos city limits. Contractor shall comply with all federal, state, and local regulations regarding disposal of herbicides and hazardous wastes outside City limits.

PART 2 – PRODUCTS

2.1 ROOT CONTROL MATERIALS:

A. HERBICIDE
The chemical sewer root control treatment consists of root killing and root re- growth inhibition. The chemical root control agent shall be registered with the Federal Environmental Protection Agency (EPA) and the State Pesticide Regulatory Agency, and shall be labeled for use in sewers to control tree roots.

Only materials whose label instructions conform to these specifications shall be accepted. All application procedures must be in strict conformance with these specifications and label instructions. Use of any root control herbicide in a manner inconsistent with labeled instructions is a violation of Federal law.

Chemicals intended to be poured down, or blown into the sewer lines as a dust shall not be allowed. The active ingredient shall not adversely affect the performance of the wastewater treatment plant when applied properly in accordance with manufacturer's recommendations. Materials shall be non- volatile in order to minimize exposure to collections system workers, treatment plant operators and homeowners through inhalation. Compounds containing copper and/or other known priority pollutants, as defined by the Federal EPA, shall be disallowed.

The contractor shall submit a list of chemical root control chemicals as an attachment to the bid.

The contractor shall use the chemical root treatment products listed in the bid.

Substitution of brand name materials and active root treatment agent are not allowed.

8.k
February 27, 2023

Packet Pg. 367

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-2 Project No. C1752-23
B. INGREDIENTS

1. Inert Ingredients
The root control material shall be formulated with foaming agents and surfactants sufficient to produce a stable, small bubble, dense foam capable of sustaining its shape and thus remaining on the treated roots. The foaming surfactants shall strip grease that typically clings to sewer root masses.

2. Composition of the Chemical Root Killing/Control Treatment Agent The chemical root control treatment agent shall be registered with the USEPA and the California Department of Pesticide Regulation and labeled for use in sewer lines.

The active component for destroying intruding roots in sanitary sewer lines shall be a potent, non-systemic toxin which kills contacted roots at low concentrations but which will not permanently affect parts of the plant distant from the treated roots. The active ingredient must be spontaneously detoxified by a natural chemical or biochemical process in a relatively short interval following its use.

3. Root Re-Growth Inhibitor
The active component for destroying intruding roots in sanitary sewer lines shall be a potent, non-systemic toxin which kills contacted roots at low concentrations but which will not permanently affect parts of the plant distant from the treated roots. The active ingredient must be spontaneously detoxified by a natural chemical or biochemical process in a relatively short interval following its use.

The active ingredient for inhibiting re-growth of root intrusions in sanitary sewer lines shall inhibit root cell growth on contact, but shall not be transported so as to damage other portions of the parent plant. The material shall bind firmly to the soil in the vicinity of openings in pipe joints so as to form a persistent chemical barrier suppressing the growth of root tips. The material shall be sufficiently stable under the conditions of use to provide protection for twelve months or longer, but shall be subject to decomposition in wastewater treatment plants without disturbing the treatment plant processes. A specimen product label(s) and Material Safety Data Sheets shall be submitted.

PART 3 – EXECUTION

3.1 APPLICATION
All work shall be performed according to label instructions and in accordance with the best recommended practice for conditions present in the line under treatment. All applications shall be done by foaming or other methods as provided on the product label.

8.k
February 27, 2023

Packet Pg. 368

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-3 Project No. C1752-23
The application of material shall be performed in such a way as to directly contact roots within the primary main line sewer to be treated. Foam quality shall be sufficient to penetrate “wye” connections at sewer laterals.

The foaming root control herbicides will be mixed with water to produce a solution; all solutions will be at a proportion in accordance with manufacturer’s guidelines. The foam shall be generated through the use of air injection equipment, and the foam shall be pumped into the sewer under pressure as foam. The foam must be generated by a machine that assures the foam will completely fill the intended sanitary sewer lines. The equipment and herbicide must function so as to deposit the foam a minimum of five hundred (500) feet into the sanitary sewer lines with each hose insertion.

For sewer lines with diameter less than 12-inches, the foaming herbicide root control product shall be applied by completely foam-filling the line with a hose inserted into the manhole and completely down the line.

For sewer lines with diameter 12-inches or larger, or with fast flow conditions, shall be foam-coated by means of pulling a properly designed nozzle between manholes, depositing herbicidal foam on the upper interior wall of the pipe. The coating shall be applied between the 9 o’clock and 3 o'clock positions of the pipe wall and completely coat up to and including the pipe crown. The application nozzle shall be supported at least 1-inch above the water line at all times. Roots shall be coated with a minimum of 3-inches of foam.

3.2 ROOT FOAMING OPERATION:

A. APPLICATION EQUIPMENT
Contractor will provide all equipment using proper operation and safety procedures to perform the work. The equipment used in foam generation shall meet the herbicide manufacturer’s specifications and be capable of generating the specified quantity and quality of foam in closed system.

The equipment used shall discharge foam at sufficient pressure as to force foam up connecting lateral sewers approximately 5-feet in small diameter pipe. In no case shall chemical agents reach the home or businesses.

Hydraulic sewer cleaning machines shall not be used prior to, or during the treatment process.

B. APPLICATION
Application of the chemical root control agent shall be by foaming in accordance with the best recommended practice for conditions present in the line under treatment. All foaming procedures shall be in strict accordance with the instructions on the container label.

8.k
February 27, 2023

Packet Pg. 369

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-4 Project No. C1752-23
A foam discharge hose shall be inserted throughout the entire length of the sewer section to be treated. Acceptable methods of conveying the foam discharge hose through the sewer section are:

1. Manually or mechanically inserting or shoving the foam discharge hose through the section, or

2. Floating a rope through the sewer section and using the rope to pull the foam discharge hose into the section.

The foam shall be pumped under sufficient pressure to assure that the entire sewer section is completely filled with foam, and to assure that the foam passes through lateral pipe connections to a distance of 5 feet in small diameter pipe. Sewer service to homeowners shall not be interrupted nor shall chemical agents reach the home or business. The Contractor must beware that excessive discharge pressure, and/or excessive quantities of material may cause foam to enter houses, or travel up forward clean-outs onto lawns.

The foam shall be pumped under sufficient pressure and completely cover all exposed interior areas of the sewer manhole including the manhole shelves, walls, and cone. No excess foam shall be allowed to spill over the top of manhole.

Hose retrieval rates must be timed to evenly distribute the full quantity of foam throughout the entire area of treatment.

When required to enter or work within a manhole, the Contractor’s employees and subcontractors shall in addition to abiding by the confined space regulations/ requirements of OSHA shall also abide by any requirements spelled out by either the container label or the specimen/chemical control root agent’s manufacturers requirements. This would include meeting the minimum protective clothing requirements and/or wearing air-line breathing apparatus.

C. ROOT FOAMING OPERATION RESTRICTION
The Contractor shall not treat the pipes with flow depth greater than thirty (30) percent of the pipe diameter. The Contractor will return to treat that sewer when the flow is normalized. The Contractor is responsible for monitoring weather to ensure that lines are not treated when the possibility of surcharging due to inflow and infiltration exist. If a sewer surcharges within a 12-hour period after a treatment has been made, the Contractor is will be required to retreat that section of sewer at the Contractor 's expense if the surcharging is a result of Contractor activities or inflow and infiltration resulting from wet weather.

8.k
February 27, 2023

Packet Pg. 370

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-5 Project No. C1752-23

3.3 SAFETY AND HEALTH REGULATIONS:

The Contractor shall comply with all provisions of the United States Department of Labor, Occupational Safety and Health Administration, Part 1910, Occupational Safety and Health Standards.

Execute all work in a manner such that injury or damage to any person, animal, structure, service, property, crop or vegetation shall be avoided.

Provide all necessary equipment and barricades to prevent pets, children, and unauthorized persons from gaining access to the site of the work. Provide adequate protection for his employees engaged in the handling, mixing, and distribution of the chemicals and ensure all the employees correctly wear such protection.

Should any chemical root control agent spill on the ground, the chemical and affected oil shall be removed and safely disposed of in accordance to the State and Federal regulations pertaining thereto. The Contractor shall handle all spills in accordance with the appropriate Material Safety Data sheets (MSDS) and shall have on site materials and equipment to contain and handle spills. The area shall be restored to a condition equal to or better than before the spill.

Prevent all chemical agents from reaching homes and businesses along the sewers cleaning route. The Contractor shall also be accountable for any damage or death to trees, shrubs, lawns, crops and gardens that are attributable to the chemicals used in the process. Should the Contractor, or his employees or agents cause any damage to public or private property, the Contractor will be required to make repairs immediately.

The Contractor is responsible for obtaining permits and meters from California Water Services at (650) 558-7800 for water supply and paying for all water usage.

3.4 WASTEWATER TREATMENT PLANT OPERATIONS PROTECTION:

The City of San Carlos’ sanitary sewer system flows into and is managed by the Silicon Valley Clean Water Wastewater Treatment Plant. As such, any root chemical treatment operations must conform to and be in accordance with the wastewater treatment plants’ specifications.

Wastewater Treatment Plant (WWTP) operations are essential functions to public health and safety. The Contractor shall take all steps necessary and appropriate to prevent adverse effects on the WWTP. The Contractor shall provide the date and time of all intended work, name and telephone number of the Contractor’s onsite supervisor, and provide any additional information requested by either the WWTP operator or the Engineer.

Introduction of any materials into the WWTP must be with the written approval of the WWTP operator. The Contractor shall obtain all necessary operation certificates and permits from the State and local agencies that have jurisdictions over the distribution and application of root foaming chemical used in this project. The Contractor shall maintain daily communication with City representatives to assure that no adverse

8.k
February 27, 2023

Packet Pg. 371

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-6 Project No. C1752-23
effects on WWTP operations results from Contractor’s work. If signs of adverse impact are revealed at the WWTP during the biological breakdown process, the Engineer has the right at any time to limit or stop chemical application in order to safeguard WWTP processes. The Contractor shall cease root foaming application until normal conditions are established as determined by the Plant Manager.

The City reserves the right to suspend or terminate the contract to restore WWTP operations as necessary. The Contractor shall not be compensated for additional setups for complying with the WWTP operational requirements.

The Contractor shall be financially responsible for any adverse effect on WWTP processes directly or indirectly caused by chemical application, including but not limited to damages to plant processes or equipment, clean-up and restoration costs, fines imposed by State or Federal agencies, pollution of receiving waters, and civil suits. The Contractor shall further indemnify and hold harmless the City, and the operator of the wastewater treatment plant, against all costs, including legal expenses, relating to treatment plant failure or other damages or pollution caused, directly or indirectly, by the applications of chemicals by the Contractor.

3.5 COMPLIANCE WITH TRANSPORTATION LAWS:

The Contractor is directed to ensure compliance with all U.S. Department of Transportation regulations relative to commercial vehicle numbering, place carding and registration; driver licensing, driver drug testing, and record keeping; and all other pertinent requirements contained in Federal Motor Carrier Safety Regulations.

The Contractor's Federal DOT number, if required, must be submitted.

3.7 RECORD KEEPING:

The contractor shall compile records for each line segment in which root control chemicals are applied. Such records shall:

1. Be accurate, complete and legible;

2. Include:
 The report date,
 The date each given sewer line was treated,
 Street name for each given sewer line,
 A description (manhole numbers, house numbers, cross streets, etc.), which will enable the Engineer to accurately identify the exact location of each sewer line,
 The pipe size for each given sewer line,
 The length (manhole to manhole) for each given sewer line,  Quantity of chemicals used on each sewer line,
 Special conditions found by the Contractor's crew,
 Quantity and location of sanitary sewer facilities substantially differ from the contract documents,
 Any pipe segments that have not received chemical treatment,  The date for each sewer line when the guarantee expires.

3. Note special field conditions, access problems or unusual line conditions; including abnormal flow condition.

8.k
February 27, 2023

Packet Pg. 372

Technical Provisions 2023 Sewer System Root Foaming Project Page TP-7 Project No. C1752-23

4. Record weather conditions and temperatures;

5. Be submitted daily or weekly to the Engineer.

Upon completion of the projects or accompanying the progress payment requests, or whenever requested to by the Engineer, the Contractor shall submit hard copy log sheets and reports as well as MS-Excel format electronic log sheets and reports.

3.8 GUARANTEE:

The contractor shall furnish Product and Service Guarantee documentation explicitly stating each line segment in which root control chemicals are applied in the form of a letter on Contractor’s letterhead, stating the locations to which the guarantee applies, the guarantee period, and guarantee dates.

A. GUARANTEE CRITERIA:
 Kill all the protruding roots inside the sewer pipes that receive treatment.
 Kill all the protruding roots at the lateral connections to the sewer mains.
 Root is defined as killed if it falls off, decreases in size, or does not increase in size within two (2) years period.
 No blockages are caused by treated roots within two (2) years.  If these requirements are not met, the Contractor shall refund one hundred (100) percent the treatment cost for the sewer line segment (manhole to manhole) or retreat the sewer line segment at no cost to the City.

B. GUARANTEE PERIOD
Contractor guarantees the work for a period of two (2) years. The guarantee period begins on the date of the treatment of the sewer pipe segment, and ends two years after the date of treatment.

3.8 SEWER BYPASSING AND DEWATERING:

Contractor shall bypass the sewer flow around the work and dewater the work area when flow is above fifty (50) percent of the pipe capacity at no additional cost to the City.

Prior to performing work, Contractor shall submit plans and procedures for sanitary sewer plugging or bypass pumping or dewatering needed during root foaming operations in accordance with the NPDES permit requirements.

Plugging, bypass pumping, or dewatering shall not cause sanitary sewer overflows or other prohibited discharges.

8.k
February 27, 2023

Packet Pg. 373

APPENDIX A

DAILY WORK REPORT

8.k
February 27, 2023

Packet Pg. 374

This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 375

DAILY WORK REPORT
(Non-Federally Funded Project)
Project Name: File No.: Date:

Contractor: Work Hours: Weather:

Item # Description Unit New and Unforeseen Work [ ] None [ ] Yes, describe:

Equip. # Description Hours Hourly Rate Ext. Amount Emp. # Employee Name Hours Hourly Rate Ext. Amount

SUBTOTAL COST OF EQUIPMENT
Inv. # Description Unit Unit Cost Ext. Amount

SUBTOTAL COST OF MATERIALS SUBTOTAL COST OF LABOR
12% Labor Surcharge for regular time (see Special Provisions) Inv. # Description Amount 11% Labor Surcharge for overtime (see Special Provisions) Subsistence
Travel Expense
Other

TOTAL COST OF LABOR
+ 35% on labor

SUBTOTAL COST OF WORK DONE BY SPECIALISTS TOTAL COST OF EQUIPMENT, MATERIALS AND WORK + 15% on equipment and material
+ 5% on work done by specialists

TOTAL COST

MATERIAL
WORK done by specialists
LABOR

CONTRACT WORK PERFORMED
Survey Station

DIARY AND REMARKS

EQUIPMENT

8.k
February 27, 2023
 
Packet Pg. 376 

APPENDIX B

SANITARY SEWER MAIN UTILITY

INFORMATION

8.k
February 27, 2023

Packet Pg. 377

This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 378

BASIN_ID PIPE_ID US_NODE DS_NODE
FULL_PIPE
_LENGTH
LENGTH_
IN_BASIN
PERCENT_
IN_BASIN SYSTEM DIAMETER MATERIAL
PIPE_COUNT
IN_DATASET
FM 10 BA/24_BA/23 BA/24 BA/23 38.38 38.38 100 Mains 0 UNK 1 FM 10 BA/45A_BA/45 BA/45A BA/45 272.22 272.22 100 Mains 0 UNK 1 FM 10 BA/54_BA/53 BA/54 BA/53 56.5 56.5 100 Mains 0 UNK 1 FM 10 BA/56_BA/54 BA/56 BA/54 131.45 131.45 100 Mains 0 UNK 1 FM 10 BI/15_BI/12 BI/15 BI/12 124.33 73.45 59.08 Mains 0 UNK 1 FM 10 BI/33_BI/12 BI/33 BI/12 263.89 263.89 100 Mains 0 UNK 1 FM 10 BO/21A_BO/21B BO/21A BO/21B 19.64 19.64 100 Mains 0 UNK 1 FM 10 BO/32_BO/30 BO/32 BO/30 226.55 226.55 100 Mains 0 UNK 1 FM 10 BO/62_BO/02 BO/62 BO/02 198.29 198.29 100 Mains 0 UNK 1 FM 10 BS/01A_BS/01 BS/01A BS/01 99.75 99.75 100 Mains 0 UNK 1 FM 10 BS/02_BS/01A BS/02 BS/01A 130.11 130.11 100 Mains 0 UNK 1 FM 10 BS/05_BS/02 BS/05 BS/02 66.74 66.74 100 Mains 0 UNK 1 FM 10 BS/24A_BS/24 BS/24A BS/24 62.17 62.17 100 Mains 0 UNK 1 FM 10 BS/35A_BS/59 BS/35A BS/59 38 38 100 Mains 0 UNK 1 FM 10 BS/35B_BS/35A BS/35B BS/35A 79 79 100 Mains 0 UNK 1 FM 10 AJ/35_BA/03 AJ/35 BA/03 234.42 234.42 100 Mains 6 CIP 1 FM 10 AJ/36_AJ/35 AJ/36 AJ/35 246.98 246.98 100 Mains 6 CIP 1 FM 10 AP2/47_AP2/45 AP2/47 AP2/45 169.62 169.62 100 Mains 6 VCP 1 FM 10 AP2/48_AP2/47 AP2/48 AP2/47 147.82 147.82 100 Mains 6 VCP 1 FM 10 AP2/49_AP2/48 AP2/49 AP2/48 168.48 168.48 100 Mains 6 VCP 1 FM 10 AP2/50_AP2/49 AP2/50 AP2/49 260.47 260.47 100 Mains 6 VCP 1 FM 10 AP2/51_AP2/49 AP2/51 AP2/49 79.75 79.75 100 Mains 6 VCP 1 FM 10 AP2/52_AP2/51 AP2/52 AP2/51 131.84 131.84 100 Mains 6 VCP 1 FM 10 AP2/53_AP2/52 AP2/53 AP2/52 118.38 118.38 100 Mains 6 VCP 1 FM 10 AP2/54_BB/38 AP2/54 BB/38 115.44 41.31 35.79 Mains 6 VCP 1 FM 10 AP2/55_AP2/48 AP2/55 AP2/48 35.8 35.8 100 Mains 6 PVC 1 FM 10 AP2/56_AP2/55 AP2/56 AP2/55 203.62 203.62 100 Mains 6 PVC 1 FM 10 AP2/57_AP2/56 AP2/57 AP2/56 265.24 265.24 100 Mains 6 PVC 1 FM 10 AP2/58_AP2/47 AP2/58 AP2/47 297.88 297.88 100 Mains 6 VCP 1 FM 10 AP2/59_AP2/58 AP2/59 AP2/58 338.97 266.32 78.57 Mains 6 VCP 1 FM 10 BA/03_AJ/32 BA/03 AJ/32 295.29 155.71 52.73 Mains 6 VCP 1 FM 10 BA/03_BA/01 BA/03 BA/01 180.52 180.52 100 Mains 6 UNK 1 FM 10 BA/05_BA/04 BA/05 BA/04 244.8 244.8 100 Mains 6 CIP 1 FM 10 BA/06_BA/05 BA/06 BA/05 278.78 278.78 100 Mains 6 CIP 1 FM 10 BA/07_BA/08 BA/07 BA/08 403.78 403.78 100 Mains 6 CIP 1 FM 10 BA/08_BA/09 BA/08 BA/09 128.74 128.74 100 Mains 6 CIP 1 FM 10 BA/12_BA/09 BA/12 BA/09 320.62 320.62 100 Mains 6 PE 1 FM 10 BA/13_BA/12 BA/13 BA/12 482.53 482.53 100 Mains 6 VCP 1 FM 10 BA/14_BA/15 BA/14 BA/15 188.39 188.39 100 Mains 6 PVC 1 FM 10 BA/15_BA/16 BA/15 BA/16 248.36 248.36 100 Mains 6 PVC 1 FM 10 BA/16_BA/12 BA/16 BA/12 351.32 351.32 100 Mains 6 VCP 1 FM 10 BA/17_BA/16 BA/17 BA/16 321.01 321.01 100 Mains 6 PE 1 FM 10 BA/18_BA/17 BA/18 BA/17 310.01 310.01 100 Mains 6 VCP 1 FM 10 BA/19_BA/18 BA/19 BA/18 252.06 252.06 100 Mains 6 VCP 1 FM 10 BA/20_BA/21 BA/20 BA/21 404.8 404.8 100 Mains 6 PE 1 FM 10 BA/21_BA/23 BA/21 BA/23 194.27 194.27 100 Mains 6 PE 1 FM 10 BA/23_BA/25 BA/23 BA/25 39.15 39.15 100 Mains 6 VCP 1 FM 10 BA/26_BA/25 BA/26 BA/25 167.99 167.99 100 Mains 6 PE 1 FM 10 BA/28_BA/26 BA/28 BA/26 334.44 334.44 100 Mains 6 PE 1 FM 10 BA/29_BA/28 BA/29 BA/28 193.12 193.12 100 Mains 6 PE 1 FM 10 BA/30_BA/29 BA/30 BA/29 297.72 297.72 100 Mains 6 PE 1 FM 10 BA/32_BA/21 BA/32 BA/21 341.65 341.65 100 Mains 6 VCP 1 FM 10 BA/35_BA/32 BA/35 BA/32 404.96 404.96 100 Mains 6 VCP 1 FM 10 BA/37_BA/35 BA/37 BA/35 216.32 216.32 100 Mains 6 VCP 1 FM 10 BA/39_BA/37 BA/39 BA/37 270.02 270.02 100 Mains 6 VCP 1 FM 10 BA/41_BA/39 BA/41 BA/39 243.93 243.93 100 Mains 6 VCP 1 FM 10 BA/43_BA/41 BA/43 BA/41 381.58 381.58 100 Mains 6 VCP 1 FM 10 BA/44_BA/43 BA/44 BA/43 138.68 138.68 100 Mains 6 VCP 1 FM 10 BA/47_BA/46 BA/47 BA/46 28.51 28.51 100 Mains 6 VCP 1 FM 10 BA/48_BA/47 BA/48 BA/47 127.52 127.52 100 Mains 6 VCP 1 FM 10 BA/49_BA/48 BA/49 BA/48 310.93 310.93 100 Mains 6 VCP 1 FM 10 BA/50_BA/43 BA/50 BA/43 273.29 273.29 100 Mains 6 PVC 1 FM 10 BA/51_BA/52 BA/51 BA/52 267.35 267.35 100 Mains 6 PVC 1 FM 10 BA/52_BA/54 BA/52 BA/54 246.92 246.92 100 Mains 6 PVC 1 FM 10 BA/53_BA/35 BA/53 BA/35 276.91 276.91 100 Mains 6 PVC 1 FM 10 BI/08_BI/53 BI/08 BI/53 121.63 121.63 100 Mains 6 VCP 1 FM 10 BI/09_BI/08 BI/09 BI/08 301.92 301.92 100 Mains 6 VCP 1 FM 10 BI/10_BI/54 BI/10 BI/54 202.5 202.5 100 Mains 6 VCP 1 FM 10 BI/11_BI/10 BI/11 BI/10 223.09 223.09 100 Mains 6 VCP 1 FM 10 BI/12_BI/11 BI/12 BI/11 160.29 160.29 100 Mains 6 VCP 1 FM 10 BI/14_BI/33 BI/14 BI/33 81.73 81.73 100 Mains 6 VCP 1 FM 10 BI/16_BI/15 BI/16 BI/15 114.71 107.42 93.64 Mains 6 VCP 1 FM 10 BI/17B_BI/17A BI/17B BI/17A 117.91 117.91 100 Mains 6 PVC 1 FM 10 BI/17_BI/16 BI/17 BI/16 192.24 192.24 100 Mains 6 VCP 1 FM 10 BI/21_BI/20 BI/21 BI/20 70.17 70.17 100 Mains 6 VCP 1 FM 10 BI/22_BI/21 BI/22 BI/21 63.76 63.76 100 Mains 6 VCP 1 FM 10 BI/23_BI/24 BI/23 BI/24 108.05 108.05 100 Mains 6 VCP 1 FM 10 BI/24_BI/25 BI/24 BI/25 20.59 20.59 100 Mains 6 VCP 1 FM 10 BI/25_BI/26 BI/25 BI/26 134.27 134.27 100 Mains 6 VCP 1 FM 10 BI/26_BI/27 BI/26 BI/27 235.79 235.79 100 Mains 6 VCP 1 FM 10 BI/27_BI/19 BI/27 BI/19 139.78 139.78 100 Mains 6 VCP 1 FM 10 BI/28_BI/26 BI/28 BI/26 75.08 75.08 100 Mains 6 VCP 1

8.k
February 27, 2023

Packet Pg. 379

FM 10 BI/29_BI/28 BI/29 BI/28 156.69 156.69 100 Mains 6 VCP 1 FM 10 BI/30_BI/29 BI/30 BI/29 191.8 167.28 87.22 Mains 6 VCP 1 FM 10 BI/31_BI/30 BI/31 BI/30 78.27 76.55 97.81 Mains 6 VCP 1 FM 10 BI/32_BI/31 BI/32 BI/31 100.12 100.12 100 Mains 6 VCP 1 FM 10 BI/34_BI/14 BI/34 BI/14 61.74 61.74 100 Mains 6 VCP 1 FM 10 BO/01_BO/60 BO/01 BO/60 91.32 91.32 100 Mains 6 VCP 1 FM 10 BO/02_BO/01 BO/02 BO/01 308.6 308.6 100 Mains 6 PVC 1 FM 10 BO/03_BO/02 BO/03 BO/02 61.72 61.72 100 Mains 6 VCP 1 FM 10 BO/04_BO/03 BO/04 BO/03 67.57 67.57 100 Mains 6 VCP 1 FM 10 BO/05_BO/06 BO/05 BO/06 257.72 257.72 100 Mains 6 VCP 1 FM 10 BO/06_BO/04 BO/06 BO/04 75.76 75.76 100 Mains 6 VCP 1 FM 10 BO/07_BO/08 BO/07 BO/08 242.36 242.36 100 Mains 6 VCP 1 FM 10 BO/08_BO/09 BO/08 BO/09 109.76 109.76 100 Mains 6 VCP 1 FM 10 BO/09_BO/10 BO/09 BO/10 91.13 91.13 100 Mains 6 VCP 1 FM 10 BO/10_BO/11 BO/10 BO/11 37.22 37.22 100 Mains 6 PE 1 FM 10 BO/11_BO/60 BO/11 BO/60 131.57 131.57 100 Mains 6 VCP 1 FM 10 BO/12_BO/13 BO/12 BO/13 187.29 187.29 100 Mains 6 VCP 1 FM 10 BO/13_BO/08 BO/13 BO/08 124.8 124.8 100 Mains 6 VCP 1 FM 10 BO/14_BO/13 BO/14 BO/13 79.61 79.61 100 Mains 6 VCP 1 FM 10 BO/15_BO/14 BO/15 BO/14 107.85 107.85 100 Mains 6 VCP 1 FM 10 BO/16_BO/15 BO/16 BO/15 203.36 203.36 100 Mains 6 VCP 1 FM 10 BO/17_BO/15 BO/17 BO/15 113.82 113.82 100 Mains 6 VCP 1 FM 10 BO/18_BO/17 BO/18 BO/17 262.58 262.58 100 Mains 6 VCP 1 FM 10 BO/19_BO/35 BO/19 BO/35 219.73 219.73 100 Mains 6 VCP 1 FM 10 BO/20_BO/19 BO/20 BO/19 140.77 140.77 100 Mains 6 VCP 1 FM 10 BO/21B_BO/20 BO/21B BO/20 162.26 162.26 100 Mains 6 PE 1 FM 10 BO/21_BO/21B BO/21 BO/21B 249.97 249.97 100 Mains 6 PE 1 FM 10 BO/22_BO/21 BO/22 BO/21 106.93 106.93 100 Mains 6 PE 1 FM 10 BO/23_BO/22 BO/23 BO/22 199.42 199.42 100 Mains 6 VCP 1 FM 10 BO/24_BO/23 BO/24 BO/23 145.54 145.54 100 Mains 6 VCP 1 FM 10 BO/25_BO/22 BO/25 BO/22 68.07 68.07 100 Mains 6 PE 1 FM 10 BO/26_BO/25 BO/26 BO/25 213.88 213.88 100 Mains 6 PE 1 FM 10 BO/27_BO/19 BO/27 BO/19 107.18 107.18 100 Mains 6 VCP 1 FM 10 BO/28_BO/27 BO/28 BO/27 211.55 211.55 100 Mains 6 VCP 1 FM 10 BO/29_BO/28 BO/29 BO/28 116.14 116.14 100 Mains 6 VCP 1 FM 10 BO/30_BO/29 BO/30 BO/29 139.99 139.99 100 Mains 6 VCP 1 FM 10 BO/33_BO/36 BO/33 BO/36 354.04 354.04 100 Mains 6 VCP 1 FM 10 BO/34A_BO/34 BO/34A BO/34 270.96 270.96 100 Mains 6 VCP 1 FM 10 BO/34_BO/33 BO/34 BO/33 147.8 147.8 100 Mains 6 VCP 1 FM 10 BO/35_BO/49 BO/35 BO/49 154.01 154.01 100 Mains 6 VCP 1 FM 10 BO/36_BO/35 BO/36 BO/35 228.18 228.18 100 Mains 6 VCP 1 FM 10 BO/37_BO/36 BO/37 BO/36 83.3 83.3 100 Mains 6 VCP 1 FM 10 BO/39_BO/38 BO/39 BO/38 125.68 125.68 100 Mains 6 VCP 1 FM 10 BO/40_BO/39 BO/40 BO/39 112.92 112.92 100 Mains 6 VCP 1 FM 10 BO/41_BO/40 BO/41 BO/40 114.36 114.36 100 Mains 6 VCP 1 FM 10 BO/43_BO/42 BO/43 BO/42 176.87 176.87 100 Mains 6 VCP 1 FM 10 BO/44_BO/43 BO/44 BO/43 95.43 95.43 100 Mains 6 VCP 1 FM 10 BO/45_BO/44 BO/45 BO/44 135.2 135.2 100 Mains 6 VCP 1 FM 10 BO/46_BO/45 BO/46 BO/45 171.03 171.03 100 Mains 6 VCP 1 FM 10 BO/47_BO/46 BO/47 BO/46 108.6 108.6 100 Mains 6 VCP 1 FM 10 BO/48_BO/47 BO/48 BO/47 139.96 139.96 100 Mains 6 VCP 1 FM 10 BO/49_BO/63 BO/49 BO/63 178.55 178.55 100 Mains 6 VCP 1 FM 10 BO/50_BO/49 BO/50 BO/49 331.68 331.68 100 Mains 6 VCP 1 FM 10 BO/51_BO/50 BO/51 BO/50 331.58 331.58 100 Mains 6 VCP 1 FM 10 BO/52_BO/51 BO/52 BO/51 208.04 208.04 100 Mains 6 VCP 1 FM 10 BO/53_BO/51 BO/53 BO/51 251.35 251.35 100 Mains 6 VCP 1 FM 10 BO/54_BO/53 BO/54 BO/53 235.31 235.31 100 Mains 6 VCP 1 FM 10 BO/55_BO/54 BO/55 BO/54 299.22 299.22 100 Mains 6 VCP 1 FM 10 BO/56_BO/06 BO/56 BO/06 204.53 204.53 100 Mains 6 VCP 1 FM 10 BO/57_BO/56 BO/57 BO/56 297.15 297.15 100 Mains 6 VCP 1 FM 10 BO/58_BO/57 BO/58 BO/57 197.6 197.6 100 Mains 6 VCP 1 FM 10 BO/59_BO/58 BO/59 BO/58 110.73 110.73 100 Mains 6 VCP 1 FM 10 BO/60_BI/05 BO/60 BI/05 168.35 168.35 100 Mains 6 VCP 1 FM 10 BO/61_BO/41 BO/61 BO/41 188.75 188.75 100 Mains 6 VCP 1 FM 10 BO/63_BO/56 BO/63 BO/56 60.23 60.23 100 Mains 6 VCP 1 FM 10 BO/66_BO/55 BO/66 BO/55 32.12 32.12 100 Mains 6 UNK 1 FM 10 BO/76_BO/48 BO/76 BO/48 65.41 65.41 100 Mains 6 PVC 1 FM 10 BO/78_BO/76 BO/78 BO/76 73 73 100 Mains 6 PVC 1
FM 10 BO/79_BO/78 BO/79 BO/78 88 88 100 Mains 6 PVC 1
FM 10 BS/01_BA/39 BS/01 BA/39 160.55 160.55 100 Mains 6 VCP 1 FM 10 BS/03_BS/02 BS/03 BS/02 86.24 86.24 100 Mains 6 PE 1 FM 10 BS/04_BS/03 BS/04 BS/03 82.55 82.55 100 Mains 6 PE 1 FM 10 BS/06_BS/07 BS/06 BS/07 97.22 97.22 100 Mains 6 VCP 1 FM 10 BS/07_BS/08 BS/07 BS/08 94.31 94.31 100 Mains 6 PVC 1 FM 10 BS/08_BS/09 BS/08 BS/09 106 106 100 Mains 6 VCP 1 FM 10 BS/09_BS/10 BS/09 BS/10 116.93 116.93 100 Mains 6 VCP 1 FM 10 BS/10_BS/11 BS/10 BS/11 209.26 209.26 100 Mains 6 VCP 1 FM 10 BS/11_BS/01 BS/11 BS/01 147.44 147.44 100 Mains 6 VCP 1 FM 10 BS/12_BS/11 BS/12 BS/11 93.86 93.86 100 Mains 6 VCP 1 FM 10 BS/13_BS/12 BS/13 BS/12 136.99 136.99 100 Mains 6 UNK 1 FM 10 BS/14_BS/13 BS/14 BS/13 103.45 103.45 100 Mains 6 UNK 1 FM 10 BS/15_BS/13 BS/15 BS/13 153.96 153.96 100 Mains 6 PE 1 FM 10 BS/16_BS/12 BS/16 BS/12 200.75 200.75 100 Mains 6 VCP 1 FM 10 BS/17_BS/16 BS/17 BS/16 260.46 260.46 100 Mains 6 VCP 1 FM 10 BS/18_BS/17 BS/18 BS/17 139.62 139.62 100 Mains 6 UNK 1

8.k
February 27, 2023

Packet Pg. 380

FM 10 BS/19_BS/17 BS/19 BS/17 160.42 160.42 100 Mains 6 UNK 1 FM 10 BS/20_BS/19 BS/20 BS/19 48.37 48.37 100 Mains 6 VCP 1 FM 10 BS/21_BS/20 BS/21 BS/20 148.58 148.58 100 Mains 6 PVC 1 FM 10 BS/22_BS/20 BS/22 BS/20 132.81 132.81 100 Mains 6 PVC 1 FM 10 BS/23_BS/22 BS/23 BS/22 232.58 232.58 100 Mains 6 PVC 1 FM 10 BS/24_BS/23 BS/24 BS/23 46.65 46.65 100 Mains 6 VCP 1 FM 10 BS/25_BS/17 BS/25 BS/17 119.28 119.28 100 Mains 6 PE 1 FM 10 BS/29_BS/27 BS/29 BS/27 251.84 251.84 100 Mains 6 VCP 1 FM 10 BS/30_BS/29 BS/30 BS/29 243.81 243.81 100 Mains 6 VCP 1 FM 10 BS/35_BS/59 BS/35 BS/59 65.01 65.01 100 Mains 6 UNK 1 FM 10 BS/36_BS/77 BS/36 BS/77 132.01 132.01 100 Mains 6 VCP 1 FM 10 BS/38_BS/58 BS/38 BS/58 301.98 301.98 100 Mains 6 VCP 1 FM 10 BS/39_BS/38 BS/39 BS/38 297.11 297.11 100 Mains 6 PVC 1 FM 10 BS/40_BI/06 BS/40 BI/06 238.88 238.88 100 Mains 6 VCP 1 FM 10 BS/40_BS/39 BS/40 BS/39 234.12 234.12 100 Mains 6 PE 1 FM 10 BS/40_BS/41 BS/40 BS/41 141.73 141.73 100 Mains 6 VCP 1 FM 10 BS/41_BS/48 BS/41 BS/48 300 300 100 Mains 6 VCP 1 FM 10 BS/42_BS/43 BS/42 BS/43 206.3 206.3 100 Mains 6 VCP 1 FM 10 BS/43_BS/44 BS/43 BS/44 246.99 246.99 100 Mains 6 VCP 1 FM 10 BS/44_BS/57 BS/44 BS/57 342.22 342.22 100 Mains 6 VCP 1 FM 10 BS/45_BS/44 BS/45 BS/44 254.26 254.26 100 Mains 6 PE 1 FM 10 BS/46_BS/45 BS/46 BS/45 229.62 229.62 100 Mains 6 VCP 1 FM 10 BS/47_BS/46 BS/47 BS/46 147.7 147.7 100 Mains 6 PE 1 FM 10 BS/48_BS/47 BS/48 BS/47 158.74 158.74 100 Mains 6 VCP 1 FM 10 BS/49_BS/48 BS/49 BS/48 229.8 229.8 100 Mains 6 PVC 1 FM 10 BS/50_BS/49 BS/50 BS/49 130.65 130.65 100 Mains 6 PVC 1 FM 10 BS/51_BS/50 BS/51 BS/50 227.96 227.96 100 Mains 6 PVC 1 FM 10 BS/52_BS/51 BS/52 BS/51 198.26 198.26 100 Mains 6 PVC 1 FM 10 BS/53_BS/54 BS/53 BS/54 205.59 205.59 100 Mains 6 VCP 1 FM 10 BS/54_BS/55 BS/54 BS/55 64.97 64.97 100 Mains 6 VCP 1 FM 10 BS/55_BS/45 BS/55 BS/45 90.52 90.52 100 Mains 6 VCP 1 FM 10 BS/56_BS/11 BS/56 BS/11 141.11 141.11 100 Mains 6 VCP 1 FM 10 BS/57_BS/25 BS/57 BS/25 85.46 85.46 100 Mains 6 VCP 1 FM 10 BS/58_BS/32 BS/58 BS/32 282.39 282.39 100 Mains 6 VCP 1 FM 10 BS/59_BS/33 BS/59 BS/33 135.05 135.05 100 Mains 6 UNK 1 FM 10 BA/02_AP/12 BA/02 AP/12 294.3 128.78 43.76 Mains 8 VCP 1 FM 10 BA/04_BA/03 BA/04 BA/03 252.38 252.38 100 Mains 8 PE 1 FM 10 BA/09_BA/04 BA/09 BA/04 202.17 202.17 100 Mains 8 CIP 1 FM 10 BA/10_BA/02 BA/10 BA/02 252.29 252.29 100 Mains 8 VCP 1 FM 10 BA/11_BA/10 BA/11 BA/10 340.08 309.25 90.93 Mains 8 VCP 1 FM 10 BA/23_BA/17 BA/23 BA/17 319.65 319.65 100 Mains 8 PE 1 FM 10 BA/31_BA/22 BA/31 BA/22 155.26 155.26 100 Mains 8 VCP 1 FM 10 BA/33_BA/31 BA/33 BA/31 239.31 239.31 100 Mains 8 VCP 1 FM 10 BA/34_BA/33 BA/34 BA/33 226.3 226.3 100 Mains 8 VCP 1 FM 10 BA/36_BA/34 BA/36 BA/34 139.93 139.93 100 Mains 8 VCP 1 FM 10 BA/37A_BA/36 BA/37A BA/36 217.46 217.46 100 Mains 8 VCP 1 FM 10 BA/38_BA/37A BA/38 BA/37A 254.87 254.87 100 Mains 8 VCP 1 FM 10 BA/40_BA/38 BA/40 BA/38 169.51 169.51 100 Mains 8 VCP 1 FM 10 BA/42_BA/40 BA/42 BA/40 462.42 462.42 100 Mains 8 VCP 1 FM 10 BA/45_BA/42 BA/45 BA/42 136.06 136.06 100 Mains 8 VCP 1 FM 10 BA/46_BA/45 BA/46 BA/45 12.17 12.17 100 Mains 8 VCP 1 FM 10 BI/05_BI/52 BI/05 BI/52 76 76 100 Mains 8 PVC 1
FM 10 BI/06_BI/05 BI/06 BI/05 233.04 233.04 100 Mains 8 PVC 1 FM 10 BI/07_BI/06 BI/07 BI/06 98.69 98.69 100 Mains 8 PVC 1 FM 10 BI/17A_BI/17 BI/17A BI/17 78.73 78.73 100 Mains 8 VCP 1 FM 10 BI/18_BI/17A BI/18 BI/17A 90.91 90.91 100 Mains 8 VCP 1 FM 10 BI/19_BI/18 BI/19 BI/18 162.88 162.88 100 Mains 8 VCP 1 FM 10 BI/20_BI/19 BI/20 BI/19 206.33 206.33 100 Mains 8 VCP 1 FM 10 BI/52_BI/53 BI/52 BI/53 156 156 100 Mains 8 PVC 1 FM 10 BI/53_BI/54 BI/53 BI/54 259 259 100 Mains 8 PVC 1 FM 10 BI/54_BI/55 BI/54 BI/55 127 127 100 Mains 8 PVC 1 FM 10 BI/55_BS/76 BI/55 BS/76 244 244 100 Mains 8 PVC 1 FM 10 BO/38_BO/37 BO/38 BO/37 78.17 78.17 100 Mains 8 VCP 1 FM 10 BO/42_BO/37 BO/42 BO/37 141.64 141.64 100 Mains 8 VCP 1 FM 10 BS/26_BA/46 BS/26 BA/46 388.23 388.23 100 Mains 8 VCP 1 FM 10 BS/27_BS/25 BS/27 BS/25 267.69 267.69 100 Mains 8 PVC 1 FM 10 BS/28_BS/26 BS/28 BS/26 119.85 119.85 100 Mains 8 VCP 1 FM 10 BS/32_BS/28 BS/32 BS/28 134.11 134.11 100 Mains 8 PVC 1 FM 10 BS/33_BS/32 BS/33 BS/32 231.56 231.56 100 Mains 8 PE 1 FM 10 BS/76_BS/77 BS/76 BS/77 24 24 100 Mains 8 PVC 1
FM 10 BS/77_BS/33 BS/77 BS/33 26 26 100 Mains 8 PVC 1
FM 10 AP2/45_AP2/46 AP2/45 AP2/46 6.74 6.74 100 Mains 10 UNK 1 FM 10 AP2/46_AP2/69 AP2/46 AP2/69 296.52 71.82 24.22 Mains 10 VCP 1 FM 10 BA/16_AP2/96 BA/16 AP2/96 148.45 39.52 26.62 Mains 10 PVC 1 FM 10 BA/22_BA/25 BA/22 BA/25 236.84 236.84 100 Mains 10 VCP 1 FM 10 AP2/10_AQ/06C AP2/10 AQ/06C 303.62 119.96 39.51 Mains 12 VCP 1 FM 10 AQ/06B_BA/01 AQ/06B BA/01 125.86 125.86 100 Mains 12 VCP 1 FM 10 AQ/06C_AQ/06B AQ/06C AQ/06B 325.33 280.37 86.18 Mains 12 VCP 1 FM 10 BA/01_AQ/06A BA/01 AQ/06A 198.56 119.21 60.04 Mains 12 VCP 1 FM 10 BA/25_AP2/45 BA/25 AP2/45 128.03 128.03 100 Mains 12 VCP 1 FM 1 AD/27_AD/21 AD/27 AD/21 148.42 148.42 100 Mains 0 UNK 1 FM 1 AD/30_AD/27 AD/30 AD/27 131.59 131.59 100 Mains 0 UNK 1 FM 1 AE/01_AD/02 AE/01 AD/02 297.66 297.66 100 Mains 0 UNK 1 FM 1 AE/02_AE/58 AE/02 AE/58 14.33 14.33 100 Mains 0 UNK 1

8.k
February 27, 2023

Packet Pg. 381

FM 1 AE/08_AD/01 AE/08 AD/01 335.11 335.11 100 Mains 0 UNK 1 FM 1 AE/23A_AE/23 AE/23A AE/23 39.75 39.75 100 Mains 0 UNK 1 FM 1 AE/38A_AE/38 AE/38A AE/38 60.72 60.72 100 Mains 0 UNK 1 FM 1 AE/38B_AE/38 AE/38B AE/38 58.88 58.88 100 Mains 0 UNK 1 FM 1 AE/49_AE/01 AE/49 AE/01 113.34 113.34 100 Mains 0 UNK 1 FM 1 AE/61_AD/02A AE/61 AD/02A 417.14 417.14 100 Mains 0 UNK 1 FM 1 AE/70_AF/17 AE/70 AF/17 150 57.5 38.33 Mains 0 UNK 2 FM 1 AG/10_AG/08 AG/10 AG/08 345.92 9.43 2.73 Mains 0 UNK 2 FM 1 AL/18_AL/16 AL/18 AL/16 112.78 112.78 100 Mains 0 UNK 1 FM 1 AM/16A_AM/16 AM/16A AM/16 164.49 164.49 100 Mains 0 UNK 1 FM 1 AM/20A_AM/20 AM/20A AM/20 152.46 152.46 100 Mains 0 UNK 1 FM 1 AM/29_AM/16A AM/29 AM/16A 15.98 15.98 100 Mains 0 UNK 1 FM 1 AM/30_AM/18 AM/30 AM/18 41.21 41.21 100 Mains 0 UNK 1 FM 1 AN/12A_AN/12 AN/12A AN/12 121.7 121.7 100 Mains 0 UNK 1 FM 1 AN/16B_AN/16A AN/16B AN/16A 150 150 100 Mains 0 UNK 1 FM 1 AN/17A_AN/17 AN/17A AN/17 192.41 192.41 100 Mains 0 UNK 1 FM 1 AN/29A_AN/29 AN/29A AN/29 96.1 96.1 100 Mains 0 UNK 1 FM 1 AN/68_AN/22 AN/68 AN/22 94.1 94.1 100 Mains 0 UNK 1 FM 1 AN/69_AN/13 AN/69 AN/13 37.55 37.55 100 Mains 0 UNK 1 FM 1 AN/70_AN/73 AN/70 AN/73 104.77 104.77 100 Mains 0 UNK 1 FM 1 AR/01_AR/40 AR/01 AR/40 181.19 181.19 100 Mains 0 UNK 1 FM 1 AR/37_AR/26 AR/37 AR/26 28.28 28.28 100 Mains 0 UNK 1 FM 1 AE/55_AE/23A AE/55 AE/23A 49.2 49.2 100 Mains 4 PE 1 FM 1 AN/72_AN/71 AN/72 AN/71 4.03 4.03 100 Mains 4 PVC 1 FM 1 AD/03_AD/02 AD/03 AD/02 108.61 108.61 100 Mains 6 PE 1 FM 1 AD/04A_AD/04 AD/04A AD/04 161.16 161.16 100 Mains 6 PE 1 FM 1 AD/04_AD/03 AD/04 AD/03 188.42 188.42 100 Mains 6 PE 1 FM 1 AD/05_AD/03 AD/05 AD/03 252.15 252.15 100 Mains 6 PE 1 FM 1 AD/10A_AD/10 AD/10A AD/10 141.53 141.53 100 Mains 6 VCP 1 FM 1 AD/10_AD/13 AD/10 AD/13 366.74 366.74 100 Mains 6 PVC 1 FM 1 AD/11_AD/10 AD/11 AD/10 189.57 189.57 100 Mains 6 VCP 1 FM 1 AD/12_AD/15 AD/12 AD/15 191.99 191.99 100 Mains 6 VCP 1 FM 1 AD/13_AD/14 AD/13 AD/14 73.24 73.24 100 Mains 6 PVC 1 FM 1 AD/14_AD/15 AD/14 AD/15 113.76 113.76 100 Mains 6 VCP 1 FM 1 AD/15_AD/16 AD/15 AD/16 161.6 161.6 100 Mains 6 VCP 1 FM 1 AD/16_AD/17 AD/16 AD/17 231.68 231.68 100 Mains 6 VCP 1 FM 1 AD/17_AD/18 AD/17 AD/18 163.67 163.67 100 Mains 6 PE 1 FM 1 AD/18_AD/02 AD/18 AD/02 328.56 328.56 100 Mains 6 PVC 1 FM 1 AD/19_AD/18 AD/19 AD/18 412.34 412.34 100 Mains 6 VCP 1 FM 1 AD/21_AD/20 AD/21 AD/20 228.46 228.46 100 Mains 6 VCP 1 FM 1 AD/23_AD/29 AD/23 AD/29 103.21 103.21 100 Mains 6 VCP 1 FM 1 AD/29_AD/27 AD/29 AD/27 20 20 100 Mains 6 VCP 1
FM 1 AE/04_AE/03 AE/04 AE/03 114.28 114.28 100 Mains 6 PE 1 FM 1 AE/05A_AE/05 AE/05A AE/05 151.5 151.5 100 Mains 6 PE 1 FM 1 AE/05B_AE/05A AE/05B AE/05A 167.06 167.06 100 Mains 6 PE 1 FM 1 AE/05_AE/04 AE/05 AE/04 163.47 163.47 100 Mains 6 PE 1 FM 1 AE/06_AE/05A AE/06 AE/05A 62.04 62.04 100 Mains 6 PE 1 FM 1 AE/11_AE/02 AE/11 AE/02 271.22 271.22 100 Mains 6 VCP 1 FM 1 AE/19_AE/17 AE/19 AE/17 122.17 122.17 100 Mains 6 PVC 1 FM 1 AE/21_AE/20 AE/21 AE/20 135.48 135.48 100 Mains 6 VCP 1 FM 1 AE/22_AE/21 AE/22 AE/21 209.8 209.8 100 Mains 6 PVC 1 FM 1 AE/23_AE/22 AE/23 AE/22 98.6 98.6 100 Mains 6 PVC 1 FM 1 AE/24_AE/12 AE/24 AE/12 238.07 238.07 100 Mains 6 PVC 1 FM 1 AE/25_AE/24 AE/25 AE/24 261.33 261.33 100 Mains 6 PVC 1 FM 1 AE/26_AE/13 AE/26 AE/13 413.97 413.97 100 Mains 6 VCP 1 FM 1 AE/28A_AE/14 AE/28A AE/14 262.45 262.45 100 Mains 6 PVC 1 FM 1 AE/28_AE/28A AE/28 AE/28A 26.25 26.25 100 Mains 6 VCP 1 FM 1 AE/29_AE/28 AE/29 AE/28 198.84 198.84 100 Mains 6 VCP 1 FM 1 AE/30_AE/31 AE/30 AE/31 386.91 386.91 100 Mains 6 HDPE 1 FM 1 AE/31_AE/32 AE/31 AE/32 288.7 288.7 100 Mains 6 PE 1 FM 1 AE/32_AE/15 AE/32 AE/15 180.57 180.57 100 Mains 6 PE 1 FM 1 AE/33_AE/16 AE/33 AE/16 262.61 262.61 100 Mains 6 VCP 1 FM 1 AE/37_AE/36 AE/37 AE/36 227.7 227.7 100 Mains 6 VCP 1 FM 1 AE/38_AE/39 AE/38 AE/39 149.35 149.35 100 Mains 6 PVC 1 FM 1 AE/39_AE/19 AE/39 AE/19 166 166 100 Mains 6 PVC 1
FM 1 AE/40_AE/39 AE/40 AE/39 151.41 151.41 100 Mains 6 VCP 1 FM 1 AE/41_AE/42 AE/41 AE/42 153.87 153.87 100 Mains 6 VCP 1 FM 1 AE/42_AE/43 AE/42 AE/43 215.48 215.48 100 Mains 6 PE 1 FM 1 AE/43_AE/45 AE/43 AE/45 255.62 255.62 100 Mains 6 VCP 1 FM 1 AE/50_AE/31 AE/50 AE/31 57.36 57.36 100 Mains 6 VCP 1 FM 1 AE/51_AE/06 AE/51 AE/06 150.58 150.58 100 Mains 6 PE 1 FM 1 AE/62_AE/20 AE/62 AE/20 261.56 261.56 100 Mains 6 PE 1 FM 1 AE/65_AE/06 AE/65 AE/06 193.94 193.94 100 Mains 6 PE 1 FM 1 AE/90_AE/89 AE/90 AE/89 39.88 39.88 100 Mains 6 HDPE 1 FM 1 AL/02_AL/01 AL/02 AL/01 134.24 134.24 100 Mains 6 VCP 1 FM 1 AL/03_AL/02 AL/03 AL/02 275.04 275.04 100 Mains 6 PE 1 FM 1 AL/05_AL/04A AL/05 AL/04A 129.47 129.47 100 Mains 6 VCP 1 FM 1 AL/08_AL/07 AL/08 AL/07 149.02 149.02 100 Mains 6 VCP 1 FM 1 AL/10_AL/11 AL/10 AL/11 266.51 266.51 100 Mains 6 VCP 1 FM 1 AL/11_AL/12 AL/11 AL/12 238.77 238.77 100 Mains 6 VCP 1 FM 1 AL/12_AL/15 AL/12 AL/15 127.73 127.73 100 Mains 6 VCP 1 FM 1 AL/14_AL/01 AL/14 AL/01 57.55 57.55 100 Mains 6 VCP 1 FM 1 AL/15_AL/14 AL/15 AL/14 257.16 257.16 100 Mains 6 VCP 1 FM 1 AL/16_AL/15 AL/16 AL/15 198.72 198.72 100 Mains 6 VCP 1 FM 1 AL/19_AL/18 AL/19 AL/18 266.5 266.5 100 Mains 6 PVC 1

8.k
February 27, 2023

Packet Pg. 382

FM 1 AL/20_AL/16 AL/20 AL/16 217.16 217.16 100 Mains 6 VCP 1 FM 1 AL/21_AL/10 AL/21 AL/10 62.01 62.01 100 Mains 6 PE 1 FM 1 AM/01A_AM/01 AM/01A AM/01 87.28 87.28 100 Mains 6 PE 1 FM 1 AM/01_AD/04 AM/01 AD/04 164.63 164.63 100 Mains 6 PE 1 FM 1 AM/02_AM/01A AM/02 AM/01A 149.03 149.03 100 Mains 6 PE 1 FM 1 AM/05_AM/02 AM/05 AM/02 397.92 397.92 100 Mains 6 PE 1 FM 1 AM/06_AM/05 AM/06 AM/05 133.58 133.58 100 Mains 6 VCP 1 FM 1 AM/07_AM/06 AM/07 AM/06 231.42 231.42 100 Mains 6 PE 1 FM 1 AM/08_AM/07 AM/08 AM/07 330.72 330.72 100 Mains 6 VCP 1 FM 1 AM/09A_AM/09 AM/09A AM/09 130.75 130.75 100 Mains 6 VCP 1 FM 1 AM/09_AM/08 AM/09 AM/08 127.96 127.96 100 Mains 6 PE 1 FM 1 AM/10_AM/06 AM/10 AM/06 166.23 166.23 100 Mains 6 VCP 1 FM 1 AM/11_AM/10 AM/11 AM/10 305.83 305.83 100 Mains 6 VCP 1 FM 1 AM/12_AM/10 AM/12 AM/10 224.13 224.13 100 Mains 6 VCP 1 FM 1 AM/13_AM/12 AM/13 AM/12 137.5 137.5 100 Mains 6 PE 1 FM 1 AM/14_AM/13 AM/14 AM/13 138.63 138.63 100 Mains 6 VCP 1 FM 1 AM/15_AM/12 AM/15 AM/12 148.27 148.27 100 Mains 6 VCP 1 FM 1 AM/16_AM/05 AM/16 AM/05 129.97 129.97 100 Mains 6 PE 1 FM 1 AM/17_AM/02 AM/17 AM/02 176.28 176.28 100 Mains 6 PE 1 FM 1 AM/18_AM/17 AM/18 AM/17 200.08 200.08 100 Mains 6 PE 1 FM 1 AM/19A_AM/01 AM/19A AM/01 161.63 161.63 100 Mains 6 PE 1 FM 1 AM/19_AM/19A AM/19 AM/19A 64.58 64.58 100 Mains 6 PE 1 FM 1 AM/20_AM/19 AM/20 AM/19 195.09 195.09 100 Mains 6 PE 1 FM 1 AM/22_AM/20 AM/22 AM/20 139.29 139.29 100 Mains 6 PE 1 FM 1 AM/24_AM/01 AM/24 AM/01 205.84 205.84 100 Mains 6 PVC 1 FM 1 AM/25A_AM/25 AM/25A AM/25 86.37 86.37 100 Mains 6 PVC 1 FM 1 AM/25_AM/24 AM/25 AM/24 139.78 139.78 100 Mains 6 PVC 1 FM 1 AM/26_AM/25A AM/26 AM/25A 12.41 12.41 100 Mains 6 PVC 1 FM 1 AM/27_AM/26 AM/27 AM/26 113.02 113.02 100 Mains 6 VCP 1 FM 1 AM/28_AM/27 AM/28 AM/27 310.75 310.75 100 Mains 6 VCP 1 FM 1 AM/32_AM/19 AM/32 AM/19 279.11 279.11 100 Mains 6 PE 1 FM 1 AM/33_AM/13 AM/33 AM/13 50 50 100 Mains 6 VCP 1
FM 1 AN/07_AN/06 AN/07 AN/06 128.24 128.24 100 Mains 6 VCP 1 FM 1 AN/08_AN/07 AN/08 AN/07 127.18 127.18 100 Mains 6 VCP 1 FM 1 AN/09_AN/08 AN/09 AN/08 112.69 112.69 100 Mains 6 VCP 1 FM 1 AN/10_AN/11 AN/10 AN/11 136.44 136.44 100 Mains 6 PE 1 FM 1 AN/11_AN/71 AN/11 AN/71 34.72 34.72 100 Mains 6 PE 1 FM 1 AN/12_AN/11 AN/12 AN/11 82.61 82.61 100 Mains 6 PE 1 FM 1 AN/13_AN/12 AN/13 AN/12 164.56 164.56 100 Mains 6 PE 1 FM 1 AN/14_AN/15 AN/14 AN/15 201.41 201.41 100 Mains 6 PE 1 FM 1 AN/15_AN/09 AN/15 AN/09 121.92 121.92 100 Mains 6 PE 1 FM 1 AN/16A_AN/16 AN/16A AN/16 147.92 147.92 100 Mains 6 PE 1 FM 1 AN/16_AN/07 AN/16 AN/07 199.33 199.33 100 Mains 6 PE 1 FM 1 AN/17_AN/05 AN/17 AN/05 292 292 100 Mains 6 PE 1
FM 1 AN/18_AN/19 AN/18 AN/19 203.54 203.54 100 Mains 6 VCP 1 FM 1 AN/19_AN/03 AN/19 AN/03 107.02 107.02 100 Mains 6 VCP 1 FM 1 AN/20_AN/21 AN/20 AN/21 71 71 100 Mains 6 VCP 1
FM 1 AN/21_AN/04 AN/21 AN/04 154.76 154.76 100 Mains 6 PE 1 FM 1 AN/22_AN/21 AN/22 AN/21 279.96 279.96 100 Mains 6 PE 1 FM 1 AN/23_AN/24 AN/23 AN/24 223.35 223.35 100 Mains 6 VCP 1 FM 1 AN/24_AN/25 AN/24 AN/25 131.9 131.9 100 Mains 6 PE 1 FM 1 AN/28_AN/53 AN/28 AN/53 282.01 282.01 100 Mains 6 VCP 1 FM 1 AN/29_AN/25 AN/29 AN/25 120.88 120.88 100 Mains 6 PE 1 FM 1 AN/30_AN/29 AN/30 AN/29 180.57 180.57 100 Mains 6 VCP 1 FM 1 AN/31_AN/52 AN/31 AN/52 288.05 288.05 100 Mains 6 PE 1 FM 1 AN/34_AN/76 AN/34 AN/76 120.54 120.54 100 Mains 6 VCP 1 FM 1 AN/35_AN/34 AN/35 AN/34 159.71 159.71 100 Mains 6 VCP 1 FM 1 AN/36_AN/32 AN/36 AN/32 195.59 195.59 100 Mains 6 VCP 1 FM 1 AN/38_AN/65 AN/38 AN/65 217.13 217.13 100 Mains 6 PE 1 FM 1 AN/39_AN/40 AN/39 AN/40 69.62 69.62 100 Mains 6 CIP 1 FM 1 AN/40_AN/37 AN/40 AN/37 407.79 407.79 100 Mains 6 HDPE 1 FM 1 AN/41_AN/42 AN/41 AN/42 184.03 184.03 100 Mains 6 VCP 1 FM 1 AN/42_AN/43 AN/42 AN/43 186.49 186.49 100 Mains 6 PE 1 FM 1 AN/43_AN/38 AN/43 AN/38 146.77 146.77 100 Mains 6 PE 1 FM 1 AN/44_AN/45 AN/44 AN/45 260.56 260.56 100 Mains 6 PE 1 FM 1 AN/45_AN/46 AN/45 AN/46 237.24 200.23 84.4 Mains 6 PE 2 FM 1 AN/46_AN/47 AN/46 AN/47 171.41 157.02 91.61 Mains 6 PE 2 FM 1 AN/47A_AN/47 AN/47A AN/47 178.14 178.14 100 Mains 6 PE 1 FM 1 AN/47_AN/48 AN/47 AN/48 49.66 49.66 100 Mains 6 VCP 1 FM 1 AN/49_AN/52 AN/49 AN/52 139.31 139.31 100 Mains 6 PE 1 FM 1 AN/50_AN/49 AN/50 AN/49 140.19 140.19 100 Mains 6 VCP 1 FM 1 AN/51_AN/50 AN/51 AN/50 200.67 200.67 100 Mains 6 VCP 1 FM 1 AN/54_AN/48 AN/54 AN/48 340.87 340.87 100 Mains 6 VCP 1 FM 1 AN/55_AN/54 AN/55 AN/54 268.87 268.87 100 Mains 6 VCP 1 FM 1 AN/56_AN/55 AN/56 AN/55 143.01 143.01 100 Mains 6 VCP 1 FM 1 AN/57_AN/56 AN/57 AN/56 82.65 82.65 100 Mains 6 VCP 1 FM 1 AN/58_AN/57 AN/58 AN/57 220.24 220.24 100 Mains 6 PVC 1 FM 1 AN/60_AS/12 AN/60 AS/12 335.18 12.64 3.77 Mains 6 VCP 2 FM 1 AN/65_AN/47A AN/65 AN/47A 266.42 266.42 100 Mains 6 PE 1 FM 1 AN/67_AN/54 AN/67 AN/54 148.15 148.15 100 Mains 6 VCP 1 FM 1 AN/71_AN/23 AN/71 AN/23 90.91 90.91 100 Mains 6 PE 1 FM 1 AN/73_AN/09 AN/73 AN/09 163.86 163.86 100 Mains 6 PE 1 FM 1 AN/74_AN/42 AN/74 AN/42 76.34 76.34 100 Mains 6 VCP 1 FM 1 AN/76_AN/32 AN/76 AN/32 52.42 52.42 100 Mains 6 VCP 1 FM 1 AR/02_AR/01 AR/02 AR/01 181.82 181.82 100 Mains 6 VCP 1

8.k
February 27, 2023

Packet Pg. 383

FM 1 AR/04_AR/02 AR/04 AR/02 409.22 409.22 100 Mains 6 VCP 1 FM 1 AR/05_AR/04 AR/05 AR/04 208.54 208.54 100 Mains 6 VCP 1 FM 1 AR/06_AR/05 AR/06 AR/05 188.51 188.51 100 Mains 6 PE 1 FM 1 AR/08_AR/06 AR/08 AR/06 464.17 464.17 100 Mains 6 DIP 1 FM 1 AR/09_AR/10 AR/09 AR/10 156.06 156.06 100 Mains 6 VCP 1 FM 1 AR/10_AR/11A AR/10 AR/11A 221.4 221.4 100 Mains 6 PE 1 FM 1 AR/11A_AR/11 AR/11A AR/11 177.46 177.46 100 Mains 6 VCP 1 FM 1 AR/11_AR/05 AR/11 AR/05 312.68 312.68 100 Mains 6 PE 1 FM 1 AR/12_AR/05 AR/12 AR/05 211.74 211.74 100 Mains 6 PE 1 FM 1 AR/13_AR/12 AR/13 AR/12 330.18 330.18 100 Mains 6 UNK 1 FM 1 AR/14_AR/13 AR/14 AR/13 318.2 318.2 100 Mains 6 VCP 1 FM 1 AR/15_AR/14 AR/15 AR/14 88.47 88.47 100 Mains 6 VCP 1 FM 1 AR/16_AR/17 AR/16 AR/17 227.96 227.96 100 Mains 6 PE 1 FM 1 AR/17_AR/18 AR/17 AR/18 86.46 86.46 100 Mains 6 VCP 1 FM 1 AR/18_AR/23 AR/18 AR/23 168.43 168.43 100 Mains 6 PE 1 FM 1 AR/19_AR/18 AR/19 AR/18 249.58 249.58 100 Mains 6 VCP 1 FM 1 AR/20_AR/19 AR/20 AR/19 130.12 130.12 100 Mains 6 VCP 1 FM 1 AR/21_AR/20 AR/21 AR/20 65.77 65.77 100 Mains 6 VCP 1 FM 1 AR/22_AR/21 AR/22 AR/21 271.05 271.05 100 Mains 6 VCP 1 FM 1 AR/23_AR/25 AR/23 AR/25 161.47 161.47 100 Mains 6 VCP 1 FM 1 AR/24_AR/23 AR/24 AR/23 142.99 142.99 100 Mains 6 VCP 1 FM 1 AR/25_AR/26 AR/25 AR/26 129.53 129.53 100 Mains 6 VCP 1 FM 1 AR/26_AR/27 AR/26 AR/27 41.86 41.86 100 Mains 6 VCP 1 FM 1 AR/27_AR/28 AR/27 AR/28 193.82 193.82 100 Mains 6 PE 1 FM 1 AR/28_AR/29 AR/28 AR/29 178.77 178.77 100 Mains 6 VCP 1 FM 1 AR/29_AR/29A AR/29 AR/29A 153.35 153.35 100 Mains 6 CIP 1 FM 1 AR/31_AR/04 AR/31 AR/04 30.9 30.9 100 Mains 6 VCP 1 FM 1 B-2/10_B-2/09A B-2/10 B-2/09A 234.15 7.53 3.22 Mains 6 VCP-CIP 1 FM 1 AD/01A_AD/01 AD/01A AD/01 181.53 181.53 100 Mains 8 VCP 1 FM 1 AD/01B_AD/01A AD/01B AD/01A 42.69 42.69 100 Mains 8 VCP 1 FM 1 AD/01C_AD/01B AD/01C AD/01B 269.38 269.38 100 Mains 8 VCP 1 FM 1 AD/01D_AD/01C AD/01D AD/01C 130.3 130.3 100 Mains 8 VCP 1 FM 1 AD/01E_AD/01D AD/01E AD/01D 202.37 202.37 100 Mains 8 VCP 1 FM 1 AD/01F_AD/01E AD/01F AD/01E 70.51 70.51 100 Mains 8 VCP 1 FM 1 AD/02_AD/02A AD/02 AD/02A 12.84 12.84 100 Mains 8 VCP 1 FM 1 AD/06_AD/02 AD/06 AD/02 292.4 292.4 100 Mains 8 VCP 1 FM 1 AD/07_AD/06 AD/07 AD/06 375.79 375.79 100 Mains 8 VCP 1 FM 1 AD/08_AD/07 AD/08 AD/07 314.57 314.57 100 Mains 8 VCP 1 FM 1 AD/09_AD/08 AD/09 AD/08 202.95 202.95 100 Mains 8 VCP 1 FM 1 AD/10_AD/09 AD/10 AD/09 357.32 357.32 100 Mains 8 VCP 1 FM 1 AD/20_AD/19 AD/20 AD/19 287.58 287.58 100 Mains 8 PVC 1 FM 1 AE/03_AE/02 AE/03 AE/02 183.83 183.83 100 Mains 8 PVC 1 FM 1 AE/09_AE/08 AE/09 AE/08 333.63 333.63 100 Mains 8 VCP 1 FM 1 AE/17A_AE/18 AE/17A AE/18 126.69 126.69 100 Mains 8 HDPE 1 FM 1 AE/20_AE/89 AE/20 AE/89 193.1 193.1 100 Mains 8 HDPE 1 FM 1 AE/27_AE/14 AE/27 AE/14 367.15 367.15 100 Mains 8 PVC 1 FM 1 AE/34_AE/33 AE/34 AE/33 223.15 177.26 79.44 Mains 8 PVC 2 FM 1 AE/36_AE/17A AE/36 AE/17A 79.97 79.97 100 Mains 8 PVC 1 FM 1 AE/45A_AE/45 AE/45A AE/45 50.45 50.45 100 Mains 8 PVC 1 FM 1 AE/45_AE/17A AE/45 AE/17A 418.13 418.13 100 Mains 8 HDPE 1 FM 1 AE/46_AE/45A AE/46 AE/45A 328.73 328.73 100 Mains 8 PE 1 FM 1 AE/89_AE/19 AE/89 AE/19 203.5 203.5 100 Mains 8 HDPE 1 FM 1 AE/99_AN/136 AE/99 AN/136 65 65 100 Mains 8 PVC 1
FM 1 AL/01_AN/25 AL/01 AN/25 457.79 457.79 100 Mains 8 HDPE 1 FM 1 AL/04A_AL/04 AL/04A AL/04 357.08 357.08 100 Mains 8 HDPE 1 FM 1 AL/04_AL/89 AL/04 AL/89 80 80 100 Mains 8 HDPE 1
FM 1 AL/06_AL/07 AL/06 AL/07 263.36 263.36 100 Mains 8 PVC 1 FM 1 AL/07_AL/73 AL/07 AL/73 125.89 125.89 100 Mains 8 PVC 1 FM 1 AL/09_AL/08 AL/09 AL/08 146.93 146.93 100 Mains 8 HDPE 1 FM 1 AL/13_AL/01 AL/13 AL/01 200.49 200.49 100 Mains 8 HDPE 1 FM 1 AL/73_AL/02 AL/73 AL/02 149.27 149.27 100 Mains 8 PVC 1 FM 1 AL/89_AL/03 AL/89 AL/03 102 102 100 Mains 8 HDPE 1 FM 1 AN/05_AN/06 AN/05 AN/06 97.76 97.76 100 Mains 8 PVC 1 FM 1 AN/25_AN/26 AN/25 AN/26 188.72 188.72 100 Mains 8 PVC 1 FM 1 AN/26_AN/06 AN/26 AN/06 285.48 285.48 100 Mains 8 PVC 1 FM 1 AN/32_AN/31 AN/32 AN/31 215.69 215.69 100 Mains 8 HDPE 1 FM 1 AN/33_AN/32 AN/33 AN/32 225.2 225.2 100 Mains 8 HDPE 1 FM 1 AN/37_AN/38 AN/37 AN/38 54.12 54.12 100 Mains 8 PVC 1 FM 1 AN/48_AN/49 AN/48 AN/49 125.73 125.73 100 Mains 8 HDPE 1 FM 1 AN/52_AN/53 AN/52 AN/53 122.49 122.49 100 Mains 8 PVC 1 FM 1 AN/53_AN/06 AN/53 AN/06 116.29 116.29 100 Mains 8 PVC 1 FM 1 AN/66_AN/01 AN/66 AN/01 449.89 273.88 60.88 Mains 8 HDPE 2 FM 1 AR/29A_AR/31 AR/29A AR/31 302.79 302.79 100 Mains 8 HDPE 1 FM 1 AR/40_AN/39 AR/40 AN/39 225.02 225.02 100 Mains 8 HDPE 1 FM 1 AE/13_AE/12 AE/13 AE/12 169.04 169.04 100 Mains 10 VCP 1 FM 1 AE/14_AE/13 AE/14 AE/13 36.15 36.15 100 Mains 10 VCP 1 FM 1 AE/15_AE/14 AE/15 AE/14 334.41 334.41 100 Mains 10 VCP 1 FM 1 AE/16_AE/15 AE/16 AE/15 8.86 8.86 100 Mains 10 VCP 1 FM 1 AE/17_AE/48 AE/17 AE/48 10.16 10.16 100 Mains 10 VCP 1 FM 1 AE/18_AE/48 AE/18 AE/48 18.53 18.53 100 Mains 10 PVC 1 FM 1 AE/48_AE/16 AE/48 AE/16 350.63 350.63 100 Mains 10 VCP 1 FM 1 AE/71_AE/56 AE/71 AE/56 54.07 54.07 100 Mains 10 PVC 1 FM 1 AF/18_AE/46 AF/18 AE/46 220.83 132.92 60.19 Mains 10 PE 2 FM 1 AN/02_AN/01 AN/02 AN/01 161.96 146.37 90.38 Mains 10 PVC 2 FM 1 AN/03_AN/02 AN/03 AN/02 269.94 269.94 100 Mains 10 PVC 1

8.k
February 27, 2023

Packet Pg. 384

FM 1 AN/04_AN/03 AN/04 AN/03 46.95 46.95 100 Mains 10 PVC 1 FM 1 AN/06_AN/114 AN/06 AN/114 50 50 100 Mains 10 PVC 1 FM 1 AN/114_AN/04 AN/114 AN/04 195.13 195.13 100 Mains 10 PVC 1 FM 1 AE/100_AE/46 AE/100 AE/46 13 13 100 Mains 12 PVC 1 FM 1 AE/12_AE/71 AE/12 AE/71 79.1 79.1 100 Mains 12 PVC 1 FM 1 AF/82_AE/100 AF/82 AE/100 186.44 124.66 66.86 Mains 12 PVC 2 FM 1 AN/01_AN/135 AN/01 AN/135 222.06 222.06 100 Mains 12 PVC 1 FM 1 AN/135_AN/136 AN/135 AN/136 189.59 189.59 100 Mains 12 PVC 1 FM 1 AN/136_AE/46 AN/136 AE/46 107 107 100 Mains 12 PVC 1 FM 1 AD/01_AD/31 AD/01 AD/31 125 125 100 Mains 15 PE 1
FM 1 AD/02A_AD/01 AD/02A AD/01 84.63 84.63 100 Mains 15 PVC 1 FM 1 AD/31_AA/25 AD/31 AA/25 135 96.86 71.75 Mains 15 PE 2 FM 1 AE/56_AE/57 AE/56 AE/57 46.95 46.95 100 Mains 15 PVC 1 FM 1 AE/57_AE/58 AE/57 AE/58 293.92 293.92 100 Mains 15 PVC 1 FM 1 AE/58_AE/61 AE/58 AE/61 302.86 302.86 100 Mains 15 PVC 1

8.k
February 27, 2023

Packet Pg. 385

APPENDIX C

UTILITY MAPS

8.k
February 27, 2023

Packet Pg. 386

This Page Intentionally Left Blank

8.k
February 27, 2023

Packet Pg. 387

6" VCP 281'
A7B6B7B8B9C5C6C7C8D4D5D6D7E4E5E6E7F2F3F4F5F6F7F8F9G2G3G4G5G6G7G8G9H2H3H4H5H6H7H8H9I3I4I5I6I7I8I9G10F10E8E9D8D9C9 J3J4J5J6J7J8K4K5K6K7L4L5
City of San Carlos - Sewer InfrastructureApril2016
Legend Manhole Lamphole Cleanout Pump Station Junction Cap Sewer Main Private Lateral Diameter, Material & Length Private System Foreign SystemCalifornia CAD Solutions, Inc.(209) 578-5580 www.calcad.com AP/12AJ/39PS/01BH/36AP2/73

8.k
February 27, 2023

Packet Pg. 388

CITY OF SAN CARLOSCITY OF BELMONTCITY OF SAN CARLOSCITY OF BELMONT 1200 15101516
1500
1150 15201512
14101420
1400
14411372
19715101532 196 860 901506 25 4251531 1561
435
15231527 8501841519 1604885200 80154415151501 4
1540 172
15051509 8758701536 1
780 1
216 40 15491508 71504
227 20
752191500
1512 815
1614 15961530 208830
1590
15241528 83560
15411545220
1600
775779
9 1528
760
1532
1525
45 1630800
209 415855 155716068406 70204 95203 865
35 1537162630
820212
785
1536 224
65 161850 85
79022391520 215
1516 15881592825
1553
1586162255810
1516 845 16101512
1251 5 1
1250
14301239106
1508
9 31240 1209
1512
1515
1235
1243
1348
8 1205
1504
150512471270
1215
108
1306
15281311
5 1524 153315770 11252311520
1521105
1310
107 10
1400
1320 61401
15241360
14 17
1419 15361206
153014091415
750
1304
1506
1405
1308 1534
1412 1529
11350
21408
1356
150114

ALBRYN LN

ROSE LN

VINE ST

SPRING LN

BUCKLAND AVEVINE STARDEN LN

DESVIO WY

SOLANA DR

HARTFORD AVEVINE ST

LYNDHURST CTSHELFORD AVE

COURTLAND RDBUCKLAND AVE

ENGLISH CT

TALBRYN DR

TALBRYN DR

LYNDHURST AVE

TALBRYN DR

TALBRYN DRPALOMA AVE

HARBOR BLVDVINE ST

OAK TREE LN
106'6" VCP-CIPP
156'6" VCP
55'6" VCP
111'UNK155'6" VCP234'6" VCP-CIPP
331'6" PE
125'6" PE
118'6" PE182'6" VCP-CIPP284'6" VCP
143'6" PE
206'6" VCP6" VCP 244'6" DIP
92'6" CIP164'6" VCP-CIPP
91'6" VCP121'6" VCP
70'6" VCP
101'6" PE
B-2/02
B-2/04B-2/05B-2/06B-2/07
AR/08B-2/21
B-2/12
B-2/03
B-2/10
B-2/03AB-2/14B-2/09B-2/15B-2/16
B-2/09AB-2/17B-2/16AB-2/18B-2/22 AR/10AR/09 D4D5B6C6D6 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 C5
C5 April 6, 2016

8.k
February 27, 2023

Packet Pg. 389

CEDAR STREET

CITY OF SAN CARLOSCITY OF BELMONT
1549
1516
1560
1541
1070
1500
15201512
1533
1541
1441
1525
154915561557
1051
83602416491601
4216721561 6849 1210 1291291604 1641
34 75521624 1659 96
76 991680 100574125
1 1597
81 1599 164816331624 16891549 581649
16651617
1217 1661
16721605 125158
11662
191596
1593 1625 16731590 1640
281656
1224
1545 18
66 171600 1630
1665
1581 1625
1617 1641
15661564
16011561
16001573 16251596
275
120171680
1612 4 9064512316251557 16731606 1664 34 59 808516181633 33 67 1609 163316421649
1600 16571609
16491656
1654
1608
40164116661681 1220
15851216 1672
1588 1665
1249 541592 5016061553 1648 20
1632
1586 163616481617
1233 1250
1232
1951688
15611565 949970
1539
1521 1584 239
2211520
15151500 5851557
1460 1553 801540
15911529
1588
1559
1552
15611524 243
951 1569
1508 1537
9101532
15791528
1560
801540 24716001569
267
15311500
5651570 1587
2511546 235
1456
15831536
15761545
161716281572
16271618
1601 1626160816241616 26164111 21
166415811200 1630
16061557
1596
15731001 1608
158010211565
11 1597 9501524 2951564
14 151315721588
1588 1633
1530 1621 165016331580158516051565
969 1645
111041
16121534 1609
10 1612
2 16221615
1577
1602
219580
1516
1556 1600950 255
ALLEY5TH AVE BRAGATO RD6TH AVE

OLD COUNTY RDE ST
STATE HIGHWAY 82
5TH AVELANE ST6TH AVE

LANE ST

MOLITOR RD

HARBOR BLVD F STKING ST

SPRING ST
STATE HIGHWAY 82

MOLITOR RD

PROSPECT STCHESTNUT STCEDAR ST

BRAGATO RDGLENN WY

EL CAMINO REALLAUREL STSUNNYSLOPE AVE

SPRING STELM ST

HULL DR

LAUREL ST
ELM ST

ENGLISH CTLANE ST

HARBOR BLVD

HARBOR BLVD

VINE STSUNNYSLOPE AVE
228'6" VCP
132'UNK
222'8" PE
191'8" PE
131'6" VCP
178'UNK
20'6" VCP148'UNK
130'8" VCP
117'UNK
331'6" VCP
357'6" VCP
130'6" VCP
231'6" PE
367'6" PVC357'8" VCP
142'6" VCP
190'6" VCP
203'8" VCP73'6" PVC
8" VCP162'6" VCP192'6" VCP 412'6" VCP
288'6" VCP
114'6" VCP
128'6" PE
202'8" VCP
71'8" VCP
135'6" VCP
273'
103'6" VCP
DB/13
AD/23AD/21
AM/08
DC/05DC/03
DC/01
DD/12
AD/19AD/08AD/15AD/14
AD/20
AD/16
AD/13AD/09
AD/12
AD/10AD/10A
AM/07
AD/11AM/09
AL/06
AL/05AL/04A AD/01DAD/01EAD/01F
DC/10
AD/27AD/29
AM/09A
AD/30
DC/04
DB/12
C5D5B6D6B7C7D7 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 C6
C6 April 6, 2016

8.k
February 27, 2023

Packet Pg. 390

1035 10031040 9911028 928996315 1027 9831020 9951032 988 10071044 10191056 975
93410001031129 10121043259 999 9871036 10241055 992
10111048 1023100 293
9179401004 97910161047
303 1015 323
81 1003
1015
996
1032 1008 996
1052 98410081027
343
3591039 354983 3671020
3271027
9951032 9881051 1007
307 1020 3471044
10191056
1051
551
601
611 291250
170
380200
2951016
275
4761007
10121044 10001031 9871024 9801055 10111048 10041035 9911028 984277 10151052 37110081039 3111007
1019 331
1043 363
1036 1012 1000 3511031
9991036
9991024
992
31510111028
335
1023 9791060 1016
10231048 1011 987 355
3191004
339305 10041035
1047
10161040
991
195 1028
251
10031040
161
360
590
80 131 330
71 111
80 267
565
521
110 541
9901020
21 989280611 420301 3071024
551
551596585295
299 250279
370
405
283287 390
360
585
501 270
30190
255 TAYLOR WY

GLENN WY

RIVERTON DRFAIRFIELD DR

INVERNESS DR

TAYLOR WY
STATE HIGHWAY 82 HOLLY ST

BRAGATO RDGLENN WY

SPRINGFIELD DRSYLVAN DR

INVERNESS DR

FAIRFIELD DR

INDUSTRIAL RD

NORTHWOOD DROLD COUNTY RD

RIVERTON DR
261'6" PE
62'6" VCP
269'8" VCP
130'8" VCP
203'6" VCP
117'UNK
108'27" VCP
372'27" VCP
373'27" VCP
365'27" VCP
91'15" VCP
81'18" PVC63'18" PVC110'UNK
249'6" VCP
235'6" VCP
264'27" VCP
238'6" VCP
238'6" VCP
319'6" VCP
255'6" VCP
251'6" VCP
298'6" VCP
278'8" PVC
222'6" PE
259'6" VCP
279'15" PVC
232'15" PVC
115'18" PE
412'6" VCP
327'6" VCP
320'15" PVC258'6" PE
254'6" PE
202'8" VCP
71'8" VCP 36" RCP
32'24" PVC91'27" RCP
316'6" VCP259'6" VCP
330'15" PVC
322'6" VCP
83'UNK
278'8" VCP
273'
99'6" VCP117'6" VCP
176'15" VCP
47'6" PE
AA/24
DB/13
DB/02
DA/16
AA/42
AA/16
AA/03AA/04
AA/02AA/01
AA/20
AA/09
AA/10 AB/03AA/01BAB/43C
DC/05
DB/01
DB/07DB/05
DB/04
AA/05
DB/09
DB/08
DB/03 AA/06
DB/11
DA/06
DB/06
AA/08
AA/13AA/11
AA/12
AA/07
AA/17
AD/19
AD/16
AD/01DAD/01E DA/01AA/01A
AD/01C AA/02A
DB/10DC/04
DB/12
DA/05
DA/04
DA/03
DA/02
B6C6D6B7D7B8C8D8 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 C7
C7 April 6, 2016

8.k
February 27, 2023

Packet Pg. 391

ARGUELLOPARK

CITY OF SAN CARLOSCITY OF BELMONT
14 71
57 252
368 236262420
414 5211454392642
121 265 248406
55 4815
253
431 431 6719
113152636
30 3622618
121119
30 924
15 980
100746 70
546196
19310
1042132
542 1065495 307
529 2452 1191107465453 103436 66264459 757055445 430 58260 126135 23574 1049
557
485 30505 20 19357
333 112
188576 42
480119
172173
357
181102176 1934
150
30 90180
238
15107
101126
226 99521 15
60192367379
59 348
35918
1192 30
975115
349
560552
115112
104 177
1100
172
130 232215 4906
9 216192182
6934 29
239185
241
19715101532
1301441527 475430136
196 860160
450
901506 2
9852522
101738 79 1004387 158536 2526 5 152 89 102511911110762122 16553 123 950
228151 184 80
965
189378108
1005
166116168 244219
134
435
1543 177
184 410191 3804201481539 915124
885
880
136 189
1544
171528 925 440111547 3201535 22
1540 172
9351531 142 18 280
8701536 1 1600
445175
148 14 945150 910156 10 123 460160 9552509206 172164 930 591152630 240
256422
10 441
42725439
257
281
14 534
533 3
531580
35 244
47 7451
423 261376 42
517
10 9425381465 9 10 56
120124278
75 279460
547 1718
484566
146
490496
1312
545
445515 33510
280
103748140
558 518 270 1082525469 11565
539 2827250345
311468
81115541
12814
526550
125461
15371 13613
10705476 6

DARTMOUTH AVE

DARTMOUTH AVE

BUCKLAND AVE

NORTHAM AVE

PRIMROSE LNSHELFORD AVELYNDHURST AVE

GARDEN LN

ERLIN DRBARFORD AVE

SHELFORD AVE

CLIFTON AVE

NORTHAM AVE

BUCKLAND AVE

EXBOURNE AVEARCH LN NORTHAM AVEANCHOR LN

DARTMOUTH AVEDARTMOUTH AVE

LYNDHURST CTSHELFORD AVE

MIRAMONTE CTPEPPER LN

COURTLAND RD

COTTAGE LN

NORTHAM AVESHELFORD AVE

WELLINGTON DR

ALTURA WY

SHELFORD AVE

HIGHLAND AVE

DARTMOUTH AVE

EXBOURNE AVE

HIGHLAND AVE

NORTHAM AVE
6" VCP
116'UNK
148'UNK
309'6" PE 156'6" VCP38'UNK
248'6" VCP185'6" VCP
76'6" VCP
144'6" PVC
97'UNK133'UNK
125'UNK
164'UNK
62'UNK
28'UNK128'6" PE110'6" PE
224'6" PE
108'6" VCP177'6" VCP
46'6" VCP33'6" VCP
103'UNK236'6" PE
52'6" VCP
231'6" PVC
159'6" VCP
141'6" VCP
213'6" PE
267'6" PE
259'6" VCP
109'6" VCP137'6" PE
279'6" VCP
159'6" VCP
202'6" PE
149'6" PE
183'6" PE205'6" UNK
193'6" PE
151'6" VCP
54'UNK
208'6" PVC115'6" PVC
256'6" PE
69'6" UNK
140'UNK
163'6" VCP137'6" VCP
221'6" PE
285'6" VCP205'6" PE212'6" PE82'6" PE
21'6" VCP
271'6" VCP228'6" PE
211'6" VCP
130'6" VCP66'6" VCP
156'6" VCP
205'6" PE180'6" VCP
86'6" VCP
168'6" PE
329'6" VCP
110'6" VCP
218'6" VCP
153'6" VCP
132'6" VCP 143'6" VCP161'6" VCP
91'6" VCP
139'6" PE113'6" VCP
228'6" VCP
119'6" VCP
130'6" VCP
287'6" PE
145'6" PE
120'6" VCP 42'6" VCP194'6" PE
234'6" VCP
237'6" PE
177'6" VCP
229'6" VCP
240'6" VCP292'6" VCP
297'6" PE
313'6" PE
39'6" PE
205'6" PE287'6" PE
101'6" PE
88'6" VCP
206'6" VCP
111'6" VCP
182'6" VCP
282'6" VCP
300'6" VCP
253'6" VCP
55'6" VCP-CIPP
118'6" VCP-CIPP
84'UNK
70'UNK
118'6" VCP
244'6" DIP
223'6" DIP
189'6" PE318'6" VCP
330'6" UNK212'6" PE
250'6" VCP
157'6" VCP
155'6" VCP
48'6" VCP108'6" PE157'6" VCP 50'UNK
199'6" VCP
166'6" VCP
100'UNK
AX/90
AR/07
AN/64
B-1/91B-1/90AV/53
B-1/87
B-1/104
AV/51AX/47
AV/22AV/21AV/20 AX/50
AX/42AR/19
AR/13
AR/12
AR/06
AV/42
AV/43
AV/48AV/44AV/45AV/46
B-1/82A
AV/41
B-1/84 AR/14AR/15
AX/36
B-1/81
AV/11AV/23
B-1/73
AV/19
B-1/78B-1/86
B-1/74
B-1/92
B-1/93
B-1/101B-1/88
AX/39AX/38AX/37
B-1/80
AV/10B-1/67
B-1/66
B-1/72B-1/71
B-1/82
B-1/84A
AV/35A
AX/78AV/54
AX/87
AX/88AX/89AV/55 AR/37AV/19A
B-1/80A
AV/50
AX/80
AR/38AR/39
AV/49AV/49A
B-1/89
AX/77
AV/52
AV/17AV/18AV/18A
AV/24AV/25AV/26
AV/27AV/33
AR/05
AX/35
B-1/85
B-1/95B-1/94AV/47
AX/51
B-1/83
B-1/96
AV/34 AX/49
AR/11
AV/35 AR/27AR/26
B-1/97
AV/39 AX/40AX/41
AX/43AX/44
AR/11A
AR/25
B-1/100
AX/48
AV/40
B-1/99
AR/23
B-1/104A
B-1/106B-1/105
AR/24
AR/18AR/17
B-2/22B-2/23
B-1/103
AR/10B-1/102
AR/09
AR/21AR/20
AR/16
B-2/19B-2/20
AR/22B-1/98
AV/12AV/28AV/30 AX/52
D4E4C5E5C6D6E6 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 D5
D5 April 6, 2016

8.k
February 27, 2023

Packet Pg. 392

CEDAR STREETPARK

CITY OF SAN CARLOSCITY OF BELMONT
153146
57 38 101 275
52 263270285 327
282121 400340171 266158 184141131
21 109
55 203
48 388267
27934
274 149 373
1540 185148
1420 180 1224
891007 100 149
30082 303
1198114 66 16431
8255
9641
1042 161 32213796 2701065 261
185 3011191 1670135 272 372258134 28110026916711066 197 276 3051680141140 26258 273 10820 152196
49 125136
19823 161123
17365 314172921049 1640124
257
137
161
287160
1361421 161
1370480 34
125136122
66 83 262
8 7339
1440 271125
124
90 12463 9046
1011
50 1441341113
995 89 170
256
81 1520 173
23 138074
33 137
1431 122574
6058
25729813111297 137117 47
136
30 130
268
490
13752 71
1441
12114951609 12
60 16361605 26 12841 1471310475 5 104
1601 8442 100
41 1340
106985 11 101 11838
82 142
1017 77 161160 261731004 97 199 27490 17270 148100 3041025 125 26518416 95 15 128 191
280
179
96 1005
222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222 655817
6849 1210
6 12918 33 132089
34 9034
1659
1642 50 139491615
18076 99
25 133066
5773 156
25171600 1630
1018133 57 18874 159132118 13509460 112 17165 82 1360 10726 222222222 30 280 311
320278
266259 148
262
1690120 128198130140 300 355
19940 1650
1620
54 1631
260269
128 265160
341258
47 270
152 199
380
42 271
286
2791630101 262185 2911651 184 264148
154188 2711611
20 273
1241610
2572651660
33 256149
261173
1037 185
18441 1481641 3403602 122
101 160
282
8 2681115 295
14957
173 326172116 1661 277290198
1070 136ENSENADA RD

BUCKLAND AVE

VINE ST
STATE HIGHWAY 82CEDAR ST
ELM ST

CHESTNUT ST

MANZANITA AVE
FIR ST

LAUREL ST

HILLCREST RD

VALLEY RD

SHELFORD AVE

HULL DR

ACACIA CT
OAK ST

ELM STCEDAR ST

VINE ST

MIRAMONTE CT

HULL DR

VINE STNORTHAM AVE CHESTNUT ST

HULL DR ELM STCEDAR ST

VINE ST

CHESTNUT ST

WALTON STCEDAR ST
50'6" VCP
162'6" PE65'6" PE409'6" VCP
398'6" PE
279'6" PE
262'6" PE
164'6" PE 40'UNK49'4" PE148'6" PE
156'6" VCP38'UNK
35'6" PE
76'6" VCP
225'6" VCP
181'UNK
4'4" PVC
164'UNK
62'UNK
28'UNK
62'6" PE
16'UNK
164'UNK
83'6" PE
38'UNK165'6" PE
357'6" VCP
54'6" VCP
177'6" VCP
136'6" PE
135'6" VCP
151'6" VCP
263'6" VCP
91'6" PE
225'6" VCP
216'6" VCP196'6" VCP
61'6" VCP
223'6" VCP458'6" VCP
135'6" VCP202'6" VCP
275'6" PE272'6" VCP
201'6" PE
113'6" VCP122'6" PE
127'6" VCP199'6" PE
127'6" PE126'6" PE
224'6" VCP306'6" VCP
210'6" PVC
128'6" VCP285'6" VCP
137'6" PE148'6" VCP
183'6" VCP
231'6" PE
135'6" VCP
166'6" VCP134'6" VCP
130'6" PE
176'6" PE
376'8" VCP
232'6" VCP6" PE
315'8" VCP162'6" VCP192'6" VCP 412'6" VCP
139'6" VCP
200'6" PE
217'6" PE 98'6" VCP288'6" PE116'6" PE
152'UNK195'6" PE
139'6" PE
99'6" PVC
150'UNK181'6" VCP
122'UNK
96'UNK
149'6" PE
87'6" PE
160'6" VCP
120'6" VCP
147'6" PE292'6" VCP
146'6" VCP
232'6" VCP
199'6" VCP
408'6" PE
86'6" VCP
168'6" PE
143'6" VCP161'6" VCP
130'6" VCP
42'6" VCP194'6" PE179'6" VCP
209'6" VCP
313'6" PE
153'6" VCP
31'6" VCP
182'6" VCP
70'UNK
267'6" PVC
121'UNK
266'6" VCP
223'6" DIP
189'6" PE
330'6" UNK212'6" PE
213'6" VCP
253'6" VCP
50'UNK
41'UNK
53'6" VCP
105'UNK
282'6" VCP
303'6" VCP
397'6" VCP
AR/07
AN/64 AE/22
AM/20
AL/13
AM/19A
AN/76
AN/35
AL/12
AN/34
AM/16
AM/17AM/01
AN/30
AM/18AM/14AM/13
AN/12
AN/14AN/16BAN/24
AN/16AN/29
AN/28
AL/07
AN/51
AR/12
AR/06
AR/29
AX/36
AL/16
AL/19
AN/13
AX/38
AD/08
AD/07AD/17
AD/16
AM/01A
AD/12
AM/02
AM/19
AM/05AM/06
AM/07
AE/20
AN/26
AM/12
AM/10
AN/06 AE/21
AN/25
AN/07
AM/15
AN/08AN/09AE/23
AN/31
AN/15
AL/01AL/14AN/23
AL/02
AN/32
AN/11
AN/33
AM/11
AL/06
AL/15
AL/08 AL/03
AN/10
AN/38AN/36
AL/04
AN/37 AN/05
AM/16A
AM/20AAN/12A
AN/17A
AN/29A
AL/21
AX/78
AE/55AM/32AE/62AR/37 AR/40 AM/22AN/16AAE/23AAN/73
AN/69AN/70
AM/29
AX/80
AR/39
AN/72AM/30
AM/33
AN/71
AX/77
AL/09
AL/20
AL/11
AL/18
AL/10
AN/40AN/39
AR/01
AR/02
AR/04AR/31
AR/05
AX/35
AR/29A
AR/28
AR/11
AR/27AR/26AR/25
AR/23AR/24
AR/18AR/17
AN/41
C5D5E5C6E6C7D7E7 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 D6
D6 April 6, 2016

8.k
February 27, 2023

Packet Pg. 393

LAUREOLAPARK
FIRE544
1053
387
580
5481318
400
103510581290 552510 10591046
388 1049621537373 13041334
1035
271224
300 349303
365
344 1027
1034322 1052
1028520372 417 4441300 501 1034524A425 490379 1040
501 1016315 348314 10174301250 501
4181289
10354001274
23 1051 42977 51
301 100324
271
356316
10081044
10261056 39
1044329 1021
1031
351043
9721055
990345
31 1225 366
257298
19 324 996
1055 36983300 47
1009309 1032381 18
302
10141048
1047
333 978397
1035
66 99110281023317 9351016 9581035
928315 1047
9539761028
1027 98310151052 10031040
333
1020
98930 4310201052
10151038317 15308
376342 1065 1004311 991380 525340304 353 1010997
191
336 984280 341
1027
1039
1051
222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222 481047 97110021040 1039 1027 941
10071044 9951032 9641020
93410001031129
1051 100710191056 929952 721044
259 98710121043
10241055
9991031 947
180 10111048
97010241055 1011
91794010041036
156 1048
1051 9231008 946
10151052 60188 1039 959982103210191056 541043 9659881036280 1023349222222222 1328440
525540 10421240400 568
1046
355
1122 1011400 1029329
1047347
371
341 560
1312380 435
401 1327 1235 1057
500 1053
399 1040
1022323364
5551159355 1018
387391375
1023337
461
1005
1166
1059 1022
363 535395 1046
1257 1041340360 4651290
1028
4061262
577409
356319
1242
599
326
412 1150491436
1139
STATE HIGHWAY 82

MC CUE AVE

HOLLY ST

CHERRY ST
ELM ST

SPRINGFIELD DR

INVERNESS DR

EL CAMINO REALLAUREL ST

SYLVAN DR

E SAN CARLOS AVEOLD COUNTY RD
OAK ST

LAUREL ST

OLD COUNTY RD
OAK ST
BAYPORT CTSTATE HIGHWAY 82

HOLLY ST

BAYPORT CTLAUREL ST

LAUREL STHOLLY STBUSH ST

ALLEYALLEYHOLLY STWALNUT ST MONTGOMERY STLAUREL STMAGNOLIA AVE ELM ST

SPRINGFIELD DR
414'6" VCP
54'10" PVC79'12" PVC
162'6" PE65'6" PE
279'6" PE
262'6" PE
262'6" VCP
335'UNK417'UNK
13'8" VCP
298'UNK
329'6" PVC
109'6" PE292'8" VCP
14'UNK
147'UNK
113'6" VCP
140'6" PVC
86'6" PVC
252'6" PE
194'6" PE
282'4" UNK303'UNK
113'UNK
294'UNK
151'6" PE
182'8" VCP43'8" VCP
269'8" VCP
106'6" VCPUNK
154'UNK
311'6" VCP
314'6" VCP
188'6" VCP
112'6" VCP
137'6" VCP
227'6" VCP
303'6" VCP
297'6" PE
181'6" VCP139'
139'6" VCP
210'6" PVC
328'6" VCP135'6" VCP
206'6" PVC
188'6" PE
376'8" VCP
238'6" VCP
36'10" VCP
169'10" VCP
232'6" VCP
164'6" PE
114'6" PE163'6" PE
289'6" PE
154'6" PE
143'15" PVC318'15" PVC
237'6" PE
210'6" VCP
412'6" VCP
184'6" VCP
258'6" VCP
253'6" VCP125'15" PE
367'6" VCP57'6" VCP
165'6" PE
334'8" VCP
261'6" VCP
271'6" VCP
311'6" VCP
195'6" PE
387'6" VCP
99'6" PVC
316'6" VCP
12'6" PVC
149'6" PE
87'6" PE
135'UNK
207'6" PVC181'6" PE334'10" VCP
300'6" PE
135'15" PE8'15" PE
161'6" PE
62'6" PE
167'6" PE
71'UNK
85'15" PVC
397'6" VCP
190'UNK
AE/22
AB/09AM/19A
AE/71
AD/31AA/25
AE/11
AA/42
AA/43
AG/47
AE/49
AB/13
AB/19
AB/05AA/20
AB/12
AB/21
AB/28
AB/07
AB/32AB/20
AB/15
AB/06
AB/19A
AB/14
AB/24A
AA/21
AD/03AE/08AE/01AM/01AM/24AM/25 AE/09
AE/27AM/27AE/31
AM/28 AG/08AG/09
AD/05
AM/26
AA/13
AA/18
AA/17AD/18
AB/08
AA/23
AE/02
AA/14AA/15
AA/22AA/19
AE/32
AE/05
AD/07AD/17
AE/03
AE/14AE/13AE/24
AE/12
AD/16
AE/04
AD/04AD/06
AE/06
AM/01AAM/02
AM/25A
AM/19
AE/20AE/21
AE/23
AD/01
AE/15AE/16 AE/28 AB/30
AD/01BAD/01A
AD/02A
AA/22A
AE/05A AE/56AE/57
AE/58
AE/61
AM/32AE/62
AB/64AE/65AE/05BAD/04A AB/61
AE/50AE/51
AD/02
AE/28A
AB/58
C6D6E6C7E7C8D8E8 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 D7
D7 April 6, 2016

8.k
February 27, 2023

Packet Pg. 394

355 50 420429
530 578
1622431112160 428
123
100 516
549539
527460
146
421 517
116 521
525407400385 502
416
156450 560120 1660152
104144 433
101 580505 521
124 564445
125
57 38 101 275
2639
362
35112 346
308 86
509404 425401
211
320 424
163 1521
44 311 446
412 1536
500 415
282121 400340216 278 389
411
301
1472222 2376
401
411117
171 266158 184141131
176 311
305214 37216 205
42016 23022110
387155 55
250
198
148 128 437470 525432
108140 424
557153
146132140136
505524537
430 529529102 424 513
511115 444
432 543
104
5801572008
1620215
29 52953230
112 500518136
201 109 423
523111
152
513412
409440 517 533
119153 534
530428
137125 427133 1622129
500 438
547408
115141207 121
530
520120124128132
111 535147
170017001700170017001700170017001700170017001700170017001700 501411
420 525420 100 565113
55 203
202 393
227209
4311426
398 393
145 67
32540810
36935 22 304199
36317
243 317 450
42010
300 504
27934
215300
386205 334
356
2301
109 11 417
149 373
182
339
16213 234225
54 399
405310
15 50125 335
417543 546
36222911 238
15001552402
1523400
320278
43 207
200 18820
338222213 3456
371
240
81 274 300 385
336
17 440307 1450157
1544
20 436
262
170224
210203
355
316
147 327
409 1527
355
200 390195189
223194
423226217
381368
152461132 315
47 270
206
416218209 343206
31 303 369159 430
151
5 41257105164 7381931012 515508316 401 421 517160 416156 42530325 51951240540 408198164
301 420201
201
447144632
30131832568
133
28330 379308219 335 401
14171ALTA LN MANZANITA AVE

SYCAMORE ST

CHESTNUT STSYCAMORE ST

MADRONA STHIGHLAND AVE

HIGHLAND AVE

ARUNDEL RD

SPRING VALLEY WY

PHELPS RD CEDAR ST

ARUNDEL RD

VINE STNORTHAM AVE CHESTNUT ST

GLENWOOD STHIGHLAND AVENORTHAM AVE

HILLCREST RDPHELPS RD

PALM AVE

PROSPECT ST

VISTA AVE

SAN CARLOS AVE

SYCAMORE ST

PHELPS RD

DEL REY CT CEDAR STHILLCREST RD

MAGNOLIA AVE

HILLCREST RD

HILLCREST RD
147'6" VCP
256'6" VCP
100'UNK
15'UNK
63'UNK
97'6" VCP
121'6" VCP
214'6" VCP
80'6" VCP
64'UNK
120'6" PE
184'6" PE
27'UNK
77'6" PE
37'UNK110'UNK52'UNK
140'6" VCP
201'6" VCP
266'6" PE
269'6" VCP
143'6" VCP
83'6" VCP
76'6" VCP
148'6" VCP
178'6" PE
341'6" VCP
126'6" VCP
50'6" VCP
139'6" VCP
217'6" VCP
192'UNK
139'6" PE
122'6" VCP 292'6" PE
185'6" VCP
47'8" PE107'6" VCP
162'8" VCP
404'
76'8" VCP221'10" PE
135'
280'6" PE
94'UNK
270'8" VCP
154'6" VCP
450'6" VCP489'8" VCP
204'6" VCP71'6" VCP155'6" PE
232'6" VCP
111'6" VCP42'6" VCP
237'6" PE171'6" PE
149'6" PVC61'UNK
356'6" VCP
99'6" VCP
26'6" VCP
163'6" VCP
261'6" PE
217'6" PE 98'6" VCP288'6" PE116'6" PE
91'6" VCP
269'6" PVC60'6" VCP
68'6" PE165'6" VCP
152'6" VCP90'6" VCP120'6" PE
220'6" VCP
260'6" PE
203'6" VCP
215'6" PE
119'6" PE
120'6" VCP
67'6" VCP
245'8" PE
151'UNK
160'6" PE
116'6" VCP
266'6" PE
220'6" PVC216'6" VCP
158'6" VCP
113'6" VCP
91'6" VCP
147'6" PE292'6" VCP
188'6" VCP
178'6" VCP108'6" VCP
183'6" VCP
121'6" VCP
162'6" VCP
59'6" PE
184'6" VCP186'6" PE
69'UNK
234'6" VCP
323'6" VCP
353'6" VCP
103'6" VCP
71'UNK
173'6" VCP75'6" VCP225'6" VCP153'6" VCP
260'6" VCP
96'6" PE
156'UNK
150'UNK
210'6" VCP78'6" VCP205'UNK
188'6" VCP183'6" VCP
231'6" CI
97'UNK
148'6" VCP
49'UNK90'UNK89'UNK
384'6" VCP
290'6" VCP
177'6" VCP
55'10" VCP
335'6" VCP
138'6" VCP
77'6" VCP
29'6" VCP
73'UNK
124'UNK
329'8" PE
282'6" VCP
59'UNK
76'UNK
397'6" VCP
AX/74A
AN/68
AT/12AT/11
AS/15
AX/04
AS/14
AX/16
AF/21AF/33AF/07AF/08
AN/45
AN/46
AN/67
AT/10
AT/13
AF/10AF/09AN/66
AN/01AF/13
AE/42AE/41AN/18
AN/19
AN/22
AN/21
AN/51
AE/38
AN/44
AX/17
AN/43AN/63
AX/31AX/30AX/29
AS/21
AX/21
AX/25
AX/26
AX/05
AX/18AX/19AX/20
AX/11
AX/24
AX/23AX/22
AX/10AX/71
AN/61
AN/62
AF/11AF/12
AS/20
AX/27AX/27A
AT/05
AT/06
AE/43
AN/06 AE/21
AE/47AE/46
AF/32
AN/02
AN/04AN/03
AF/20
AN/05AN/53AN/17AN/52
AF/19
AN/48
AT/15
AN/49
AN/47
AX/03
AN/56
AT/03A
AN/55
AN/54
AN/47A
AT/14 AN/58
AN/57
AT/04AS/05
AN/65
AX/14AX/15AT/09AS/06AT/08AT/07AS/07AS/09AS/08
AS/12AS/11AS/10
AS/16
AN/50
AX/55A AE/38A
AE/38B
AN/17A
AX/24A
AS/25
AE/40
AS/08BAS/08CAS/08A
AX/75
AX/83
AN/74 AN/20
AF/56AX/76
AX/35
AX/07AX/08AX/74AX/09
AX/72
AX/06
AX/12
AX/61
AX/13
AS/22
AN/60
AS/17
AN/42AN/41
AN/59
AS/18
AS/19
AX/28AX/34AX/54
D5E5F5D6F6D7E7F7 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 E6
E6 April 6, 2016

8.k
February 27, 2023

Packet Pg. 395

CITY HALLPARKCITYHALL

LIBRARY
751
720578 1525
6401622 700 737
537 736
600
765
780549
785760
1508 680657
610
547502
753736
7871660
725
580
625
1432 1232
1053
1341 1148
504 638
622
744425 717
580
525
711
1100
424
603
6761249540
530
400
577
411 1375
640508
64914721451
668
665640
6201147
1213537 554
657632
531 1400
14561456145614561456145614561456
602602602602602602602 712 745 772772772772772772772772772772772772772772772772772772772 784557
810
644
6211560
650 722664
737
750
16371637163716371637 769
580 672
796
1360 79913251620
652 788616
1524 1324 773518 1340
6121600
1441
1566
777
781530
7901622
641 701 757757757757757757757757757757646
1536 13011350
628 744
606 648
760
1537
731
565
1427718656 757757757757757
14561456145614561456145614561456 1244700 750
510 1059
1338393
4311426 648
663
733
1046
500
515
565
648
535 11051156
1455
734705
601
537373 1333 50113041334
1347 1064
1400 1163 713
510 619547
700560
770681501
1501546
520 553 1245616
1500 648523 6771301
5061523
1328440
6121188
501
522
568
517385
10615511250544 6301187
1450 641
740711626
1322 1058
13601321
1413 634
5611431
1527 575
355
1344
512 1139
423 10705521416
1524 1307 718
657
532 1178
530 628
6601324
633
678
564 741722 745517 574 664 7301263 749529 732
408 1061
420 510
11711385
44714461421 656
1414
1235
1052569
545401
1179529

LAUREL ST

CHERRY STEL CAMINO REALALLEYWALNUT ST

OLD COUNTY RDMAGNOLIA AVE

CHESTNUT ST LAUREL STELM ST

CHERRY ST

WALNUT ST

SAN CARLOS AVEALLEYALLEY
ALLEY

CEDAR ST ALLEYELM ST

CEDAR ST

ALLEYHOLLY STLAUREL ST

ALLEY OLD COUNTY RDSAN CARLOS AVEHOLLY STELM ST

LAUREL ST

CHERRY ST

CHESTNUT ST

OLIVE ST

WALNUT ST

SAN CARLOS AVE

LAUREL ST

MAGNOLIA AVECHESTNUT ST
26'6" VCP
311'UNK
330'18" VCP
263'10" VCP
150'UNK256'6" VCP 9'10" VCP
314'6" VCP
263'6" VCP
370'8" PE
106'6" VCP
10'6" VCP122'6" PVC
199'6" VCP
325'18" VCP
404'
76'8" VCP
418'8" PE
221'10" PE
260'6" PE
372'6" PE
19'6" VCP
271'6" PE351'6" PE
430'6" PVC386'10" VCP
228'6" VCP
200'6" PE
95'UNK
207'6" VCP
209'6" VCP
391'8" VCP
350'10" PVC
136'10" VCP
345'6" VCP
190'6" PE
425'6" VCP361'18" VCP374'10" VCP
377'10" VCP
290'6" VCP
122'6" PE
172'18" VCP
107'18" VCP
296'18" VCP
205'6" VCP9'10" VCP
223'6" VCP
328'18" VCP
374'6" VCP
303'6" VCP
136'18" VCP372'6" VCP
375'12" VCP
376'6" VCP
298'6" PVC
98'6" VCP
168'6" PE
135'
151'6" VCP
166'6" PVC149'6" PVC61'UNK
303'10" VCP
370'6" PE
99'6" VCP 323'10" VCP
99'8" VCP
371'8" PE206'8" VCP
369'6" PE
370'6" PE
369'10" VCP405'18" VCP
301'8" VCP
261'6" VCP
397'6" VCP 120'10" PVC
181'6" PE
55'10" VCP
351'10" VCP
19'10" PVC
80'6" VCP
317'6" PE
50'8" PVC
329'8" PE
59'UNK
27'UNK42'18" VCP
303'18" VCP
127'8" PE
346'UNK
397'6" VCP
AG/06
AE/70 AG/45
AB/57AB/37AG/07AB/29
AG/21
AB/54
AB/31AB/53
AG/02
AF/50AG/29AF/51
AG/30
AG/03AG/04AG/17
AF/47AF/01AF/14
AF/33
AF/05AF/03AF/07AF/08
AF/18
AG/11AG/14AG/12AG/13AE/39AE/38
AG/35AG/18
AG/05
AG/15AG/01
AG/33
AG/32
AG/08
AE/43
AG/44
AE/21 AE/25
AF/49
AE/15
AE/33AE/34
AE/16
AG/10AE/29AE/26AE/28
AG/16
AF/42AF/43
AE/18AE/48AE/17
AG/25
AF/44AF/45
AF/48AF/46
AE/36
AE/37
AF/38AF/37
AF/06
AE/47AE/46
AF/04
AE/19
AE/45
AF/52
AF/17
AE/30
AF/02AF/15AF/16
AF/32
AE/17A
AF/42AAF/42B
AG/35A
AE/38A
AE/38B
AE/45A
AG/01A
AG/48
AG/28
AE/40
AE/28A
AG/46
D6E6F6D7F7D8E8F8 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 E7
E7 April 6, 2016

8.k
February 27, 2023

Packet Pg. 396

BURTONPARK
11451030
1013 1032 11491161 126412251017 1036 12601124117311361181 1041541 1025
11761035 118214491040 1310
1001
110111481185 12711310
11601325
1037 124312251188 12671100 1324
1174
1550 12511125 13521149 1328
1153 12001553 1036 11761337
1296 13161293116011891041 13201137 13131172 122411801161 1029 1191
12361513 126312771525 12481195130111841537
1199
15241633 1548 1325
117510281041
10101021 11371533
1579 122411441037 1175
143914451641 1348
1100120 1137
1313
115111251009
1560 133312441649 1471
1224116011681248 1217
1158
116
131514631148
15841725
1356
135113191760 139013993162
331338 1516
1327
1740 134913161449
17121747
13851332
1909 14431368
11401037
11281161108
13361124 13091101 1190 1284 13211343 12231148 1198
118810261004
11951349 11821565
12601173
1152 11981183 127212011236109 14131425115 1437 12021239 1022 11671101112
13261239 12591149 13531621 1245 134013001136
10411100 11851028
1184
1179
1033 1136 1197A
13001369 1235 13471160146016111161 1415 136515121124 1423 13171532 12721136 144214201100 13121137
115010191564 1125
12161040
13231185 13121125 12471330135111721180 12001617 1309
1624 1515 13161675
135713241636
1333 13681332
1338 1422 14151148
1331 1374 1457
13491347133515011636 1436
13641620 146117311748
1129 1306
13721800
631532
136414851614 1412 13411661
1701 1600
1324 136013091357
1140 24135713271837
138913651825 1424
1549 1460 1224
1332136513001107
1836 1373138013121311 13801809
1904 13691339 1423
1224 1316 1375 1340
171201
1344 10015481337
1324135713091700
1525
1637 1340
1344 1393
15051837 14751380
14401648 1525 1200
137217171751
1623 138513651824
1301 1363 321333 1380
13691925
144815351681
1325 14011800
18011724 14161325
1812 1312
1601 1536 13331701
11171816 1672 13481737
1748 1356
1924 13811353 25
1724 1613 1423 126813481548
1381134013161311
1383 10
1848 139213321200 1801
15601625 15721711 13411732 1308
1700 13491125
132417171132 1823
1325 140613621940 13871359
1689 1561 1365
1648 13331808
13821824 1318
1358
1708 133215001567 1512
1725 13401537
133913391736 142413461848
1350
1343
13251693 1373
137313201660
138113181124 1817
137513451908 1836 14251384
1716 1401 12481585 13401524
1308 14171551 1341
1345 13611300
1326 641315 1358
1637 1437 13561387

BRITTAN CREEK

BRITTAN CREEK

BRITTAN CREEK

BRITTAN AVE

CHESTNUT STCEDAR ST

GREENWOOD AVEWOODLAND AVE

ROSEWOOD AVE ALLEY

HOWARD AVEGREENWOOD AVE

GENEVA AVE

WOODLAND AVE LAUREL ST

ROSEWOOD AVE

WALNUT ST

GREENWOOD AVE

LAUREL ST

EL CAMINO REAL

HOWARD AVE

HOWARD AVE

ALLEYASTER RD

MORSE BLVD

WOODLAND AVE

BELMONT AVE

WALNUT ST

LAUREL ST
ELM ST

CEDAR ST

BRITTAN AVE
ELM ST

ROSEWOOD AVE

BELVEDERE AVEELM ST
73'10" VCP
10" VCP
248'10" CP
75'10" CP
210'6" PVC23'6" PVC
203'10" VCP
41'UNK
220'UNK
358'6" PE
247'15" VCP
296'6" PVC
248'6" PVC
212'6" PVC
312'8" CP
399'15" VCP 402'6" CP
208'6" UNK
294'6" CP
400'15" VCP
151'4" PVC
378'15" VCP
283'6" VCP
215'6" VCP
128'6" RCP
142'6" CP401'15" VCP400'6" PE 398'6" CP-CIPP
303'15" VCP
220'6" CP
288'6" UNK
286'8" CP
205'6" CP
233'6" CP
296'8" PE
287'6" RCP294'6" PE
235'
295'6" PVC
212'6" PVC
295'8" CP
142'8" CP299'6" CP
205'6" CP
405'6" VCP
145'6" VCP
307'6" CP
6" CP
267'6" CP
581'6" CP
388'6" CP
279'6" CP
340'6" CP
234'6" CP
247'6" CP
295'6" VCP
197'6" CP
234'8" PVC10'UNK
294'8" VCP
247'8" VCP
312'6" CP
11'UNK280'6" VCP
58'6" VCP
346'15" VCP
286'
297'12" VCP
6" VCP
206'6" CP
291'6" PVC 299'10" VCP
12" VCP10" VCP
188'8" PVC
20'15" VCP
335'12" VCP
246'12" VCP
130'UNK43'8" CP133'UNK 203'15" VCP
70'10" VCP
125'UNK
122'UNK
AI/75A
AP/13
AP/15
AQ/03
AQ/01AP/10AP/09
AP/11AQ/06
AQ/07
AJ/31
AP/12
AJ/33
AJ/32
AQ/06ABA/03
AJ/35
AJ/36
BA/05
AJ/05
BA/06AJ/06AI/72
BA/07AJ/07
AI/50
AI/71
AH/46AI/40
AJ/03
AI/41AI/75
AJ/29
AI/80
AI/39
AI/38
AP/01AP/02AI/77
AJ/26AJ/02
AJ/28
AI/76AI/81AJ/01AP/03AP/02A
AI/33AI/34AI/83AI/37AH/37
AI/47
AH/38
AI/45AI/44
AI/46AI/43
AI/05
AI/74
AH/30
AH/29
AI/04
AJ/04
AI/42
AI/07
AI/48
AH/40AH/36
AI/06
AI/73 AP/05AAJ/34
AQ/11
AJ/30
AH/39
AJ/27
AI/82
AJ/25AAJ/25B
AJ/38AP/16AJ/39
AH/52
AP/03A
AP/06A
AQ/02F7G7H7F8H8F9G9H9 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 G8
G8 April 6, 2016

8.k
February 27, 2023

Packet Pg. 397

1124
20562088
2024 20492095 2088962947912
9711030
1022 2164
22381101 2222
1110 135111222522248
131
1251
2325 1414
19622071 1937 1149
2063 19492048
2080 2057 1928
2304 141 1360
31323511119 121 1250
2266
2008939 196819432079
20962071
2004953
97710402095 200521202080 2124
1319
2208 1324
2232
13532352 2233
2261 144108
2532311 1400128
1070
21211046 2101
1333222422151109
1002260
1372317
2305
245208129
2023 11401981
1957
2065 2008200020922032916
2108
21212111982 2130
2180 1313
131610472252
120
2384 2257
2087942
2071 1317
132010401011
1041 1344
222910892340 2233
1130 1402253
2320120
2332
2056
919 2064940 1082 19772015
11002055 2012
2072217 2041
21091005 2172
1082 21171076 21252212
1341
1116 1281011
2273 82331
2317 317123
964
916 2089 2016
925 2079 2080950
20812048 2020
20572088 20211200
13122140
106010701064
2240
227211332368
153
1135
2031 1949
2056946
20162009205
2112 2013
21162077216 2125
22052190 13171058 1017
22212236 132422011065
1242360 13572237
2388 1368117 2308
2016 1974
2001198320231094
922 2063
221 9831050
2136 13252113
910 2064 2008
923 19652072
968 20732088
2049958 2009
1250
2111 21231052
1053 133711131059
22681095 11122241
14722672325
2324
2005
928 20552123
2087956 20842072 2041
2100209 21142108
227 995
2156214821522148
2212 21612133
2290 110
1124 2247136 107
2343 361200
127
19412032 2048
941910
2079938
2124
13161305
21452157 2211
13492258 22251083 1334
11313541023 119
1030 119118 261
37 324
1931
19692007911 934
20332047
2064203321041201
1300
2119
2072
20092064
959 20961010 2017
130112492116
2132
13212133 13321306
1071 1115 10822092278
22391091120
1201 27712 1376112
200201
2047 19552032922 2024
1101
928 2085
230 2168 1331
216521251029
13281345
101
2733012339
2328 1408249
193320011057 2024
2017935 2031
2071 20242056 2100932
2144 13012160222
2216
1077
1322301 224310172376
23162312 30916 159
1001147
2040959 19612080
2016 2025
2028209120259651020
206510602096
1010 2117
2139 1325
225611172217
111
26524
2321108 25
2204
22202149 1312 13401329
22252320 1125
104 2251 125
1384169
1159 321207

BRITTAN CREEK

BRITTAN CREEK

BRITTAN CREEKBRITTAN CREEK

LUPIN AVE

HOWARD AVE

OAKHURST AVE

TAMARACK AVE

BELLE AVE

BRITTAN AVE

HOWARD AVEDAYTON AVE

CORDILLERAS AVE

BRITTAN AVE EDGEHILL DR

WILDWOOD AVEBRITTAN AVEALAMEDA DE LAS PULGAS

BROOK ST

BIRCH AVE GREENWOOD AVEEUCALYPTUS AVE

ROCKRIDGE RDTAMARACK AVEHOWARD AVE

CORDILLERAS AVE

GREENWOOD AVELUPIN AVE

OAKVIEW DR
334'6" PE
203'6" VCP-CIPP
141'6" PE
193'6" PE
50'6" PE
118'UNK
173'6" PE
57'UNK
6" PVC
125'10" VCP64'4" PE
17'12" UNK
333'10" VCP
351'6" VCP
354'6" VCP
66'6" VCP
405'6" PE
168'6" PE
39'6" VCP
194'6" PE237'UNK155'8" VCP
456'12" VCP
131'UNK
131'UNK
310'6" PE
450'12" VCP
245'6" VCP
260'6" VCP
339'6" PVC
226'8" VCP
254'6" PVC
343'6" PVC
239'8" VCP
250'6" VCP
230'6" VCP
475'6" PVC
252'6" VCP
148'6" VCP
405'6" VCP193'6" PE
342'6" VCP
36'6" PVC6" VCP291'6" PE 168'6" VCP282'6" PVC 216'6" VCP 341'6" PE
73'6" PE
288'6" VCP164'6" VCP-CIPP
332'10" VCP
209'6" PE
42'UNK316'6" VCP278'6" PE
145'6" VCP110'6" VCP
268'6" VCP285'10" VCP321'6" PE
162'6" PE
343'6" VCP
311'6" VCP
175'6" PE
342'6" PVC
326'6" VCP
321'6" PVC
217'8" VCP
277'6" PVC
140'8" VCP
100'10" VCP352'6" VCP
250'6" VCP334'10" VCP6" CP
269'6" PE
271'6" VCP
194'6" VCP
146'6" VCP193'6" PE
171'6" PE
105'6" VCP66'UNK
300'6" PE
351'10" VCP
70'UNK
189'6" PE
153'6" VCP
238'10" VCP
218'10" VCP
212'6" PE
241'6" PE
165'6" VCP
94'6" VCP
312'6" VCP
124'6" VCP
244'6" VCP
189'6" VCP
228'6" VCP
269'6" VCP
91'
52'UNK
76'6" VCP
AI/22
AI/89
BH/42
AZ/84AZ/85
AP2/45
AI/71
BA/23BA/24BA/25
BA/18
AJ/09
AI/52
BA/22BA/21
BA/19
BA/31
AJ/10
AI/70
AJ/11
AI/09
AI/69
BA/33BA/34
AJ/12
BA/35AP2/50
AZ/47AZ/39AZ/54AZ/53
AZ/52AZ/42AZ/46
AZ/51AZ/55AZ/50AZ/49AZ/56
AZ/48
AI/10AI/55AI/23
AI/24
AI/25
AZ/57AI/13
AI/64AI/15AI/14
AI/17
AZ/66
AI/61
AI/62
AZ/65AZ/61
AP2/55
BA/20
BA/32
BA/26BA/28BA/29 AP2/48
AI/17A
AZ/69
AZ/75
AZ/68
BA/56
AZ/73
AI/88
AI/18AAI/87
BH/40
BA/54
AI/86AI/26AI/53
AI/67
AI/68
BA/36
AI/53AAI/54
BA/53
AJ/14AJ/13AI/58
AI/66AI/11
AI/57
AJ/15
AI/65AI/56AI/12
BH/01
AI/59
AZ/40AZ/62
AI/60
AZ/60
AI/61AAI/63
AZ/59AZ/58
AI/18
BN/01 AP2/49
G6H6I6G7I7G8H8I8 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 H7
H7 April 6, 2016

8.k
February 27, 2023

Packet Pg. 398

WHITE OAKSELEMENTARYSCHOOL
1338 1516
14831317 1161357
1909 1341362
1386 13717031381
1380
1409 1449
172915261561
1351 119
2130 1627
223
24314351414
1909 14431368
13941949 1336
13821928 1383
1620136021402115
1405 1725230
1906
1331 1374 1457
1363 14741912
2004 1332
171713852005
1319 13631384
17201324
1525118 1573
1353 127
207 1705 16451682
2291944 18001400 1805
165
1362 1920 1426
1398 112
160015422025
17371422 113
1438 19641413 250
631532
1957
20082000 13681917
13641333 1411534
1864 182 16201535
1505 281425
18001365 1935 1415051546
1605 16141561 16451368
1317 1805
1700 81341 1377
15211344
1550
16541400 1641
1415 1662
1700
138913651825 1424
1381 15391908 1374 120
144811916172012 140
16613901300
1324
1740
1369 9126 155015251341 1611
141 15521912
2129 165317241638213
1820 1701409317
1224 1316 1375 1340
15711350 1644
1919 125
20211308 17618321393
177136913921340
14421940 14101439
2020 11
16171365
218
1950 125
1344 10015481337
1221376
1456144
15422013
1640
15251345 10
1350 1405 1529
20351420 16201357 1573 16531392
1368 1713 1635
1429236
15051837 14751380
1916 1369 1091300
1374
1405 15313391376
1615471325
13691925
1965 162013331342 1383 1563
13981357 1211635
14718162009 1701337
1338 1711404
19051930 14341370 1431
2010
1548 1618
1411212 1628
1641191428 1750 1733
1904 1351 1121388
1356 1301393
134813731925 135
14111395
1398
17191549
1530
1572 168116371409
16541681
1311436
1941 1330
14201341 1379
1671158
121604
155714071333 16801375
15131380
1349 1400
165
17291710
1121411 17211956
1379 10115251368
11716011924
13841317
1621241910 1424
1358
1920 14101281337
1720 14613651336
14051410
15451332
111
162816132110 16341440
1416 1717 16431376
100 17011430
15091081343 1564
1378
1464165713761921
1554
1331 1660
15061353 121374
1354 18201345
15621405
173216462135
1408
13861933 1324 1377 1354
1375
1291521381
6 1393 1505
154515621805 16191356
1531918 16211373
17211413
242 176235 1825
1861 1362 1511
1131905 1579
1382 1500
1591316 1355
2018313711352
145019151430
2030 140
1901
16192120 1646
224217 17032145
1431
192514501340 14581359
1445 1549157415261393 16271360
200 1616
1384 228 1717
248321

BRITTAN CREEK

CHESTNUT ST

BELMONT AVE

CHESTNUT ST

CEDAR ST

ORANGE AVE

OAKHURST AVE

GENEVA AVE

CEDAR ST

EL SERENO CORTE

CHESTNUT STORANGE AVE

BELMONT AVE

OAKHURST AVEPARK AVE GOVER LN

CEDAR STST FRANCIS WY

SUNNYDALE AVECHESTNUT STPARK AVEOAKHURST AVE
ELM ST

HOWARD AVEBELMONT AVE

CHESTNUT ST

WHITE OAK WY

CEDAR ST BELVEDERE AVERICHLAND CTWHITE OAK WY
149'UNK61'UNK
168'6" PE
320'8" PE
39'6" VCP38'UNK
128'10" VCP
194'6" PE237'UNK
23'UNK
148'12" VCP
95'UNK
321'6" PE
191'6" VCP
285'6" PE
252'6" VCP
148'6" VCP170'6" VCP
250'UNK
310'6" VCP
303'6" CP
330'6" VCP
142'6" VCP
188'6" PVC
248'6" PVC
483'6" VCP
320'6" CP
351'6" CP
404'6" CP
360'10" VCP162'6" VCP25'6" VCP
321'6" PE
366'10" VCP
304'12" VCP
129'6" CP
124'8" PE
87'UNK
189'6" PVC
318'6" PVC
202'8" CP
245'6" CP
280'15" VCP
85'6" VCP
396'6" PVC
71'6" VCP113'6" PVC
252'8" PE181'UNK199'12" VCP
252'8" VCP
294'8" VCP
281'8" PVC
286'
217'6" VCP
60'6" VCP
297'10" VCP
343'6" VCP 258'6" VCP
73'6" PE
151'8" VCP
119'8" VCP
293'6" PVC
269'6" PVC
90'6" VCP
241'6" VCP
150'8" PVC
140'8" PVC
252'6" VCP
282'8" VCP
160'8" PVC
340'8" VCP
290'6" PVC
66'UNK
255'8" PVC
253'8" PVC
139'8" VCP142'6" PVC
166'8" PVC
127'6" VCP
66'UNK
64'UNK
70'UNK
296'6" PVC
250'6" PVC153'6" VCP
132'6" PVC
364'6" PVC
347'6" PVC137'6" VCP
11'6" VCP123'6" PE
147'6" PE
267'6" PVC
246'6" VCP36'6" PVC
59'6" PVC
250'6" PVC
73'UNK319'6" PE
240'15" VCP133'8" PE 374'15" VCP
99'6" VCP
134'8" PVC
7'UNK
188'8" PVC
325'12" VCP
126'12" VCP
AP2/03
AQ/20
AP2/73
AQ/65AQ/66AQ/67
AQ/08AQ/10AQ/06ABA/02
AQ/21AQ/19AQ/18
BA/01AQ/06B
BA/03
BA/10
AQ/24
AQ/25
AQ/06C
BA/05
BA/04
AP2/02
AQ/57
BA/08BA/09
AP2/10
AP2/67
AP2/16AP2/07
BA/12
AP2/40AP2/41AP2/42AP2/43BA/16
AP2/60
BA/13
AP2/44AP2/69
BA/15
AP2/47
AP2/45
BA/17
BA/14
AJ/08
AI/71
BA/23BA/24BA/25
BA/18
AJ/09
BA/21
AP2/55 AP2/05AP2/04
AQ/37AQ/34AQ/35AQ/58AQ/17
AQ/59
AQ/51
AQ/11
AQ/12
AQ/13
AQ/16
AQ/15
AQ/14
AQ/22
AQ/09
AQ/27
AQ/29
BA/11
AP2/01AP2/11AP2/12
AP2/13
AP2/34
AP2/39AP2/38AP2/14AP2/15
AP2/17AP2/28AP2/33AP2/37
AP2/46BA/26AP2/48AP2/61AP2/62
AQ/30
AQ/33
AQ/37A
AQ/28
AQ/26
AP2/74
AQ/64 AQ/63
AQ/05
AQ/56
AQ/60
AP2/18
G7H7I7G8I8G9H9I9 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 H8
H8 April 6, 2016

8.k
February 27, 2023

Packet Pg. 399

949118945
1028 10322805
2805 153161
15410751036
1731028 175
1075
1037
1071
1063 172
132 2652
10451067
1079 1781044
105971
10911561083
10982809
273227202844
2602
5281323 268226735
2648
108
2717
2821 2721 25211020
26022833
2744 10
2812
172831 26332827
2648
21 610
270414
25361089
2616
26081097
3 2610
2663
26882681
105610402816
2813
28251088
2837 2740
2852 26112603
2616
2720 61086 13
2715 2608
1094
264814
3339 510
1078
10822828
2710
1093 5
26412607102668
262821 3238
102812
1060
10 2817
60257027
11 1791262816
10401068
1841041
24161621024
2808
137 61044 24191048
2708 10
2 2527.5
2728 2533
2801 263526052839
2905
10 1291231111172824
3 9 2628
2901 266226532835
2691 6
2915
2800
10252801
1030.528011071 191
953
2817 10592813
10851902813
1030 185
242028091020
120
10492809
1079
961 136
1861032 1081
1106
2806
136
10522816 2424
1001059 148957
1053
2520
2730 6
26222724 2529
9 2654
2711
7 28401066
2612 26342625
1609511031 9411016
1065144
10812817
1080 2 2417
2832
25272716
2826
28402836 2800
4 26542647
42636
1842804 243015
2516227061010
2548
26422832 109628162844 9
2615
267426672632
44 116
2805 10852820
2817 1087
2829 1091
2841 1092 1
28282820
2805 2616
7 1 26942683
1052 105 14
1641036 2676
1090
1084
2736
2824
62804
2809
2907 264020
155 107 15
27102836 2421
1090 2713
2848
2531
1095
2603.528452841
290928232819 2664

BRITTAN CREEK

BRITTAN CREEK

SUNSET DR

BRITTAN AVEROGERS AVEPORTO ROSA WY ALAMEDA DE LAS PULGAS

SAN SIMEON WYHEWITT DR

TRAMANTO DRHEWITT DR

BRITTAN AVESARA LN

HILL AVETASKER LN

MAJORCA WY

SAN MIGUEL WY

COBBLESTONE LN

THORNHILL DR

SUNSET DR

FAIRBANKS AVE

TRAMANTO DR

SAN REMO WY

APPIAN WY

WILSHIRE CTBRITTAN AVEGRACELAND AVE

GRACELAND AVE

ALDERLEE WYDE ANZA AVEDE ANZA AVE

FOREST LN

LA BARTHE LN

BURNHAM CT

GRACELAND AVE

GRACELAND LNTRAMANTO DRLOCARNO WY VAL MAR PLBRITTAN AVEMILANO WY 23'UNK
166'6" PE
186'6" PE58'6" VCP
162'UNK
17'UNK
285'10" PE
119'6" VCP
193'10" PE
89'6" PE
246'6" VCP
97'6" VCP
149'6" VCP
200'6" VCP
370'6" VCP
147'6" VCP250'6" VCP113'6" VCP
126'6" VCP
319'6" VCP268'6" VCP
80'6" VCP
238'6" PVC
142'6" PVC
129'6" VCP
198'6" VCP
154'6" PVC
116'6" VCP
72'6" VCP
156'6" VCP177'8" VCP235'8" VCP305'8" VCP 289'10" VCP 173'6" PVC
196'8" VCP
238'6" PVC
169'6" VCP
137'6" VCP
141'6" PVC
116'6" PVC
321'6" VCP
219'6" VCP164'6" PVC171'6" PE
137'6" VCP
42'10" PE217'10" VCP
255'10" VCP
113'10" VCP
237'6" VCP
90'6" VCP32'6" VCP152'6" VCP
258'10" PE50'6" PE
101'6" PE
145'6" VCP198'6" PVC
230'6" PVC
131'6" PVC
228'6" PVC
206'6" VCP75'UNK
123'10" PE
201'6" PE
59'6" VCP
98'6" PE
156'6" PE76'6" VCP122'6" VCP229'6" VCP222'6" VCP
274'6" VCP189'6" PE
272'6" VCP
185'6" PE
179'UNK170'6" PE157'6" PE141'10" PE
220'6" PE
117'6" VCP180'6" PE36'8" PVC98'8" PVC
135'6" PVC
112'6" VCP33'6" VCP200'6" VCP
294'6" PE342'6" VCP
149'6" VCP79'6" VCP252'6" VCP
239'6" VCP
190'6" VCP
220'6" PE
78'6" VCP123'6" PE
49'6" VCP158'6" PE
99'6" VCP
73'6" PE
49'UNK
92'6" PE
BH/41
BH/39
BH/26BH/25
AJ/25AJ/24
BH/17
BH/16
BH/22
BH/18BH/19BH/21
BH/27
BH/28
BN/29BN/28BN/27BN/26
BN/23
BN/36BN/46BN/37BH/12BH/11
AJ/23
BH/09
BH/31BH/33BH/34
BN/20BN/35BN/34BN/33BN/32 BN/41
BN/45
BN/42BN/43
BH/30BH/29BH/32
BN/22
BH/35BV/41
BV/14 BN/47BN/54BV/20
BI/07BH/33A
BH/11ABH/12A
BH/32A
BH/36
BH/37
BN/01
BH/14BH/15
BS/49BS/50
BH/23BS/51
BH/20
BN/44BN/40BN/39
BH/24BS/52
BN/50
BN/51BN/52
BN/48BN/49
BN/30
BN/53
BN/31BN/21
BN/25BN/24
BV/44BV/01BV/43
BV/45
BV/02BV/36BV/37 BV/03
BV/38
BV/16
BV/40
BV/17
BV/42
BV/15 BV/04BV/05BV/19 BV/06
BV/07
BV/08
BV/10BV/09BV/12
H5I5J5H6J6H7I7J7 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 I6
I6 April 6, 2016

8.k
February 27, 2023

Packet Pg. 400

FIRE
2325 1414
2131190
112 55
1434145 235 3332344
1171 245208129
220 236113
2332
14482352 2322349
133 325241
1436117
1135
346
35223631244 1480241
363155
15281541316
352602 33038 61
429
4342673 1483
462434 317
1361332411
20825212
257
260225152511
2541 1636726
319
2648 75
418 311
2357 3482413 1464205
1256
149 382160 172261
10 1515120770 1892616
1242600 131
2610
4182663 410
804192681 411
384380
140137
148823692460 366
367
7182611
402378
403
378368 470
353
6 2517 1252608
30 11
4131423
2631434
1493435
1440510
347220105
362245 201
14814750 16041326
1385418 17741
2641 338
1455426 4357156
440425
85128398 129392 1561 473388
1460
5 144
1506102534
275 383
125
311 501400
45511666443
1557410570 305402 88
20911 240
147
2336 212
224124 232
23291179 1420
24162410 2341 338215
236
2419
156
186 228 1509131
1350 117
33813962635 407
100
328318324338 310
339 1545 124333
2137 2353 227
217
2403
1381 13026749
1415
2653 327
62308
465325442
2401 121
127
139 109 237
153 228128
37 324
3292340 1430
229
101116
1492420 337
200
14263282092333
2328 249
231
1106
1001147
216 240
2348 3422345 228 219 1440
2321108 25
1180
4 130
2540 15122401 143
1192622 30914218
1366 212601 1621
65 108113374 1410
15152654 387 79
891569 132
244
2434 1529 2480 151
216
16207422529
434 103410426 3182625
4194214312613 1439 346435
370 441366
120383 125379375
133
1159 321207
1202337 334
341
2162417 20315
3552491280
265 166 373
1340
133118376
4272647 419
1463362
448365
2232430 1223 344
2361 1472350351
2091672 2432 1341 1002548 137
109136761 113
34392 708
411393
3582667
1529
24093 127 223132
8 3722373
15181306
22 27 16231374402
4032616 385 423379
60 3552683
2372360 142145248 212
15001327
319
112 324
375 46365
2640 73
84349
345224 1456
201
25324222530 1612421
160269 379
734
360
359 691447331
4471121475
2664 345 83

BRITTAN CREEKBRITTAN CREEK

BRITTAN CREEK

BROOK ST

OAKVIEW DROAKVIEW DR

RUBY AVE

GARNET AVE

BRITTAN AVEALAMEDA DE LAS PULGAS

ALAMEDA DE LAS PULGAS

NEAL AVE

RIDGE RD EMERALD AVE

HILLTOP DR

HOWARD AVE

CORDILLERAS AVEHOWARD AVE

OAKVIEW DR

THORNHILL DR

EDGEHILL DR

HILL WY

HILLTOP DR

GAYLORD STGRACELAND AVE

DE ANZA AVE ALAMEDA DE LAS PULGAS

BURNHAM CT EMERALD AVEWILDWOOD AVEEDGEHILL DR

HOWARD AVE

OAKVIEW DR

CORDILLERAS AVE
267'6" PVC
141'6" PE
239'6" VCP
115'6" VCP
202'UNK146'UNK
182'UNK
23'UNK
57'UNK
247'6" PVC
300'6" VCP
131'UNK
80'UNK
260'6" VCP
100'UNK130'UNK
148'6" VCP36'6" PVC
118'6" VCP
97'6" VCP94'6" PVC
132'6" VCP
132'6" VCP
80'6" VCP
81'6" VCP
222'6" VCP
147'6" VCP
141'6" VCP
117'6" VCP72'UNK 209'6" VCP32'6" VCP
126'6" VCP131'6" VCP
323'6" VCP
263'6" VCP
308'6" VCP
339'6" VCP
106'6" VCP
117'6" VCP
67'UNK86'6" PE83'6" PE
56'6" VCP
186'6" PVC
265'6" PVC
204'6" PVC
291'6" PE 168'6" VCP
209'6" VCP
174'6" VCP
166'6" PE
34'6" VCP
238'6" VCP
208'6" VCP
152'6" PVC
138'6" VCP
122'6" VCP106'6" VCP
103'6" UNK137'6" UNK
228'6" PE
235'6" PE157'6" VCP
62'UNK47'6" VCP
129'6" VCP244'6" VCP
142'6" VCP
234'6" PE198'6" PVC 297'6" PVC
6" VCP
230'6" PVC
131'6" PVC
228'6" PVC
158'6" VCP
300'6" VCP206'6" VCP
147'6" PE75'UNK
345'6" VCP
342'6" VCP
230'6" VCP
280'6" PVC
91'6" VCP
201'6" VCP
94'6" VCP
160'6" UNK388'8" VCP12'8" VCP
136'8" VCP
29'6" VCP
139'6" VCP
273'6" PVC382'6" VCP
244'6" VCP
462'8" VCP
170'8" VCP
272'UNK
270'6" VCP
161'6" VCP
6" VCP
255'8" VCP
154'6" PE
233'6" PVC
252'6" VCP
268'6" VCP119'6" PE48'6" VCP
133'6" PVC
149'6" PVC
140'6" UNK
120'8" VCP
128'6" VCP
85'6" VCP
232'8" PE
247'6" VCP
254'6" PE
132'6" VCP126'6" VCP82'6" VCP
311'6" VCP
65'6" VCP206'6" VCP
91'6" VCP140'6" VCP169'6" PE
185'6" PE
170'6" PE157'6" PE
239'6" VCP
123'6" PE
99'6" VCP
73'6" PE 217'8" VCP
85'6" VCP
282'6" VCP302'6" VCP 134'8" VCP
195'6" PE
92'6" PE
BS/05
BS/27
BA/52
BH/42
AJ/24
BH/11
BS/55BS/54BS/53
AJ/23
BH/09BH/08AJ/22AJ/21
BA/49AJ/18AJ/19AJ/20
BS/44BA/48BA/47BS/18BS/21
BS/26
BS/25BS/19BS/20
BS/29
BS/22
BS/23
BS/15
BA/38
BA/46BA/44BA/45
BA/45A
BS/28BS/24BC/25BB/23
BB/22BB/21
BB/20BS/14BB/36BB/35BB/30
BB/17
BB/25
BB/29BB/28
BB/10
BA/30 AP2/55
AP2/56
AP2/57BB/40
BB/39
BB/43BB/44
BS/02BS/03BS/04
BS/10BS/09BS/01A
BS/13AJ/22A
BH/04ABH/04B
BI/07
BH/11A
BB/25ABS/24A
BB/49
BH/37
BA/54BA/53BN/01 BA/37ABA/37
BA/39
BS/01
BA/42BA/43
BA/41BA/40
BS/12BS/16
BS/17
BA/51
AJ/16
BA/50
BS/57
BS/32
BH/02
BS/58
BS/45
BH/07AJ/17
BH/10
BS/46
BS/38
BS/47BH/14
BS/48
BI/05
BS/43
BS/49BS/50BS/42
BS/39
BI/06
BS/51BS/41BS/40
BS/52
BB/32
AP2/59
BB/26
BB/33BB/41BB/42
BB/34
BS/11BS/56
BB/18A
BB/18
AP2/49
BB/16
AP2/51
BB/19
BB/15
BS/08
BB/37
BS/07
BB/38
AP2/52
BS/06
AP2/53AP2/54
H6I6J6H7J7H8I8J8 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 I7
I7 April 6, 2016

8.k
February 27, 2023

Packet Pg. 401

WHITE OAKSELEMENTARYSCHOOL
24314351414 107
1809121142914551434
18151437
1458 136 1912
1438 1371964 1821413 250
268 19291973 1750
1700118
1907 18101671448
1820
254325 18251419 255 143
177020041436 125
125
1455 2019 182
1480 1948
12519492312151
137236
2020146 243
2025 144236
167 2055 156
2622079
20291930
2071201
2160510
178
1332054
710
20242102
404 269
179 20351464 18281925
435 2107
108
1515120 120143261
131 625
157 137
19862084 219
1979195575020052036
1936
195021251488 236
218260 237125
162248 2000
249
720 1937320 250 1970
1971276
2792125
2150 1937
212235
255
247 1612030
240 148
19502132061
198520302085 253
288
14592100
124
1972
1973 109219
200 132 1916121
273 2122037
248435 175
2110
2111 2031473
1731460 100143
2030167230
113 185 136254 200
211 158
125 266235
269 1934153 1912031
310 242 149 1933
455 1949272 19992001
2025
1662033 1826320
1440 124
1979166
18301420 1976
1435 1943155
200
1732060 154
2145
1509 251272 1967
237 172225117 1912155
1792672048143
19442072 236
421 2672052
3101476 1917 1820
2115 118224 178
1966
535 116
260 615 117128
620
243183 2016
465 2019
196319181464
1311436
19671447 1990
2056
1121411 17211956
130 17421430 1452
131315
1441
1460 1957
100 1701
1850 17201426 113
1985 1910
1446 183
1421459
176235 1825
161172 18061440
1431
19052601423
149330
2060410213
515 148
1900225 1979
600245210
711250 2066287 2043
2067
255 19672091
408
20611463
105224 1978266 243
267130
2036 167136
152159 220
225441
19612120
248321
149 1906
1439 1781465 1971
172 1122110
126115
1961
254 1662012 149 113
133 255 12519202007
141
335 254181
2015278
1470 2005
1472
21251943
100 112135 131230
109 124231
2042 635
2049 19381925224
231 2004
2612040405
19241447 2007325
2065 1942151
1960242 2232135
247 1984 2130
281 19852018
220 280 173
719163300
2075
191 2043212
1814137 1960
101218 20571471 1929
1500 179420 100
201 154
140
2013137 2044 140
325 207230 145
330 19452010
2130
1456
415
130248
234
1291924230 2019
1927
260447 237 CORDILLERAS CREEK

RUBY AVE

OAKHURST AVE

KELTON AVE

SUNNYDALE AVECHESTNUT STPARK AVE

COLTON AVE

CORDILLERAS AVE

ST FRANCIS WY

ALBERTA AVE

EATON AVE

EATON AVE

RUBY AVEST FRANCIS WY

CEDAR ST

WHITE OAK WY

FAIRMONT AVEPARK AVE

EATON AVE

KELTON AVE

PEARL AVE

ALBERTA AVE

CEDAR STFAIRMONT AVEPEARL AVE KELTON AVEPARK AVE
45'12" VCP
139'6" PE
135'6" PE
153'6" PE
37'UNK7'UNK
137'6" PE136'8" PE
148'12" VCP
172'12" VCP
274'12" VCP
97'12" VCP
148'6" VCP
298'6" VCP
73'6" PE
246'6" VCP 283'6" VCP
36'6" PVC
263'6" VCP
211'6" VCP
308'6" VCP
222'6" VCP
339'6" VCP
53'6" VCP
43'6" VCP136'6" VCP
270'6" VCP
301'12" VCP130'6" PE
128'6" VCP 6" VCP
299'12" VCP
151'6" VCP
226'12" VCP
316'8" VCP
209'8" VCP
146'8" PE240'15" VCP133'8" PE 374'15" VCP
156'6" PVC
56'6" VCP
330'6" PE
252'6" VCP
62'6" VCP
297'6" VCP
130'6" PE260'6" PE
210'6" VCP112'6" VCP
265'6" PVC
204'6" PVC
307'6" VCP
91'UNK
329'6" VCP
298'6" PE
258'12" VCP
202'12" VCP333'8" PE
63'6" PE 197'6" PVC
151'6" PVC
56'UNK62'UNK
136'6" PE
62'UNK
279'6" PE
297'6" PVC
160'6" PVC
213'6" PVC
249'6" PVC
260'6" PVC
319'6" PVC
66'6" VCP130'6" VCP144'6" PE
382'6" PVC
312'8" PE
86'6" VCP 284'6" PE
277'6" PE66'6" VCP
282'6" VCP
151'6" PE
58'6" VCP
324'8" VCP
319'6" VCP
146'6" PE268'6" PVC
162'6" PE
381'6" PE
149'6" PE132'6" PE
174'6" VCP
166'6" PE
254'6" PVC
152'8" PVC
118'6" PVC
142'6" PE
139'6" PE
197'6" VCP
128'6" PE
147'8" PVC
140'8" PVC
228'6" PE
331'12" VCP
BX/05
BC/47
AP2/47
BB/29BB/28
BB/27BB/10 BC/41
BC/05
BC/42BC/01BX/09BB/08BB/07
BB/04BB/03
BB/02AK2/10
AP2/22BB/01
BC/03
BC/02BX/11
BX/12BX/17BX/16
BX/20
BX/15
BX/21
BX/13
BX/14
BX/22BX/27BX/26
BX/25AP2/19
AP2/21AP2/26
AP2/20AP2/27
AP2/29
AP2/30
AP2/35
AP2/32AP2/31
AP2/55
AP2/36
AP2/63AP2/56
AP2/57AP2/64AK2/07AK2/06
AK2/05AK2/03AK2/04
AK2/09
AK2/13
AK2/02
BB/43BB/44
AQ/51AP2/28AP2/37
BB/45
BX/06A
AQ/61AP2/70 BX/30BX/31AP2/74
AP2/71AP2/72
BX/29
BX/28
BX/23
AP2/06AP2/18
AP2/25AP2/23
BX/08
AP2/24
AP2/31A
AP2/68
AK2/14
AK2/12AAK2/01
BX/19BC/45BX/18AK2/12
BX/10
BC/43
AK2/08
BB/06BB/05BB/46AK2/11
BC/08BC/07BC/40BC/06
BB/47
AP2/58
BB/09
BB/31
BB/48
BB/32
AP2/59
BB/26
BB/42
H7I7J7H8J8H9I9 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 I8
I8 April 6, 2016

8.k
February 27, 2023

Packet Pg. 402

EATONPARK2985
2648
2908
29092905
614
2980
21 610
7602947
622620
25 2895
28 2813
2924
2800
3339 510
2921
2670
21 2812
39 23 2650
2934 20
2705
7 282542
70110
271340 28242714
60257027
2918
609
2706
35 52921
85 2905
2975 2807
36 2915
2917 7302913
26408017
27 2746
2768
28362726
2866
2878
2734
2776
2873
28192730
272192848
29 2769
60 750
16 2630
2936
29352947 2905
5 2717
11 51129102916 515
2996
34 40
28082916
2911
8 18
2837
27602854
33 2729
203040
601609
29202916
29 2900
2701
711 50929202928
2941 2620
29122908
2917
2940 26802908
24 28182710
2842
2872 2772
27402855
286714
45 28012923 2702
2532
28302720
2843
27802860
2750
28316
2735
2709
2932293629402944
29374 2610
2901 26602880
2904
2806
2819
29462952
2935
28 2913290935

CYPRESS CT

ROLAND AVE

ROLAND AVE

GRANITE CTTERRACE RD

OAK CREEK LNDEBBIE CT

ALDERLEE WYDE ANZA AVEDE ANZA AVE

LA BARTHE LNTERRACE RDSHERWOOD DR

FRANCISCAN CTAMBER CTEATON AVEDEBBIE PLEATON AVE

OAK CREEK LN
60'6" VCP179'6" VCP
214'6" PE
271'6" VCP148'6" VCP
126'6" VCP
208'6" VCP251'6" VCP
142'8" VCP78'8" VCP
95'6" VCP
220'6" VCP
228'6" VCP
111'6" VCP332'6" VCP
154'6" VCP
203'6" VCP
332'6" VCP
198'6" VCP
100'6" VCP
205'6" VCP
242'6" VCP
297'6" VCP
78'6" VCP6" VCP
227'UNK
140'6" VCP
354'6" VCP
83'6" VCP
177'6" VCP113'6" VCP
114'6" VCP
189'6" VCP 135'6" VCP
171'6" VCP109'6" VCP140'6" VCP
68'6" PE199'6" VCP146'6" VCP
212'6" VCP107'6" VCP
141'6" VCP
162'6" PE 125'6" VCP
99'6" VCP
110'6" VCP187'6" VCP
80'6" VCP108'6" VCP114'6" VCP
263'6" VCP
116'6" VCP
20'UNK250'6" PE107'6" PE
6" PVC73'6" PVC65'6" PVC
BO/32
BO/15BO/13
BO/39
BO/61
BO/76BO/78
BO/21B
BO/29
BO/18
BO/17BO/14
BO/12BO/09
BI/29
BO/48BO/47BO/46
BO/45BO/41
BO/40BO/44
BO/42BO/36
BO/30
BH/35BV/41 BI/07
BO/62
BO/21A
BO/63
BO/08BO/20BO/19
BS/52
BO/27BO/28
BO/21BO/23BO/25BO/22BO/24
BI/31BI/30
BO/56BO/07
BI/32
BO/57
BO/16BO/49
BO/59BO/58
BO/50
BO/35
BO/53
BO/43
BO/38BO/37
BO/51
BO/33
BO/52
BO/34BO/34A
BO/26
I5J5K5I6K6I7J7K7 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 J6
J6 April 6, 2016

8.k
February 27, 2023

Packet Pg. 403

CLIFFORD ELEMENTARY SCHOOL

CITY OF REDWOOD CITYCITY OF SAN CARLOSCITY OF REDWOOD CITYCITY OF SAN CARLOS 1250
32 216
2716 2402682 1022712 1741
2765
2807
434 317
1470 142403
26 21 179546
25241734
1112661 40
2800 2708 138
25542751A
27112736 25952585208
418 311
153
384380
971
16512621
37 50
2685
27722809
378368 470
353899 343942 2777
2130 208
100
1440510
379375 148
242428
5349 171525 29 2242670
26702688 17532662 112
2701
2545206
85128398 129392 1561 473388
2 2300165
172
412650
45 1184136
26542660
2705 2693
2525
209 2515
81 546919 2224
57 2704 602730 2700 2656
2715
2713 25752565
1557410570 305402 88
401 478957
13 12 10 1643
2641 24
44 26742696 1292692
2810
25382705 76
2555
2801 2614
26232804
339333
419
115
61 103 242340
2686 123
254425502785 2604 68
2704 202
325442
474
105 163112
2132640 1679
2734 21
226 2172745
2746 11
2727 1224
237
227
312142725
229
17 223
11215
2221218
220238
18 2819 1127402721
2701
2760
2646 64
25082681
27482713
891569366364 132358
331 154
15 14162630
6521 26
33 139
202
2717 2771
133352 1450 477348
231016 173
1430 178
43 511 328 1583324515 93
1607
165516
282651
28082804 11727
2638
2773 2724 2647
212 452720
2803
1727162710
2760 7
2815
2729
61 2807
12 220
2741 1228
12321122
251
27302726
20 472
15 2335
2415106
5640
2701
2708
509 318
2620 50 321
1338 31
2680 236
2811
2813
27352731 219
250
2784 12162721
2322727
28 3245
232125 1723
17612702
2805 205
2661
23 273327212715
2750 123315
214
216 1220221
226
512735
27112705
244
2709 2651
3081460 136
85112610 315 1619
241016677317 20
972660 25
2724 17332720
26302803 17692620
2639
338431 14196
8 6 2330309
2631 1820 20
3623

CORDILLERAS CREEK

SUSIE LN

FRANCES LNMICHAEL CT

EATON AVE

CLIFFORD AVEVICTORIA MANOR

DE ANZA AVE

MAPLE WY

ALAMEDA DE LAS PULGAS

EATON AVE

EATON VILLA PL

ALAMEDA DE LAS PULGAS

RAYMOND CT

CAMELOT CT

HILLTOP DR

DEBBIE CT

KRISTA LN

TIMOTHY DR

FRANCES LNCLIFFORD AVETIMOTHY DR

HILLTOP DRDE ANZA AVEDE ANZA AVE

ALAMEDA DE LAS PULGAS

GARNET AVE

ST FRANCIS WYDEBBIE PL

EATON AVE

ROBIN WY GARNET AVE

NORBURT LNBANBURY LN
60'6" VCP
198'UNK
118'UNK
65'6" UNK
264'UNK
203'UNK
79'UNK38'UNK
62'6" VCP82'6" VCP
148'6" VCP
169'6" VCP
242'UNK
117'6" VCP
175'6" VCP
128'6" VCP
128'6" PE
263'6" VCP
126'6" PE
34'
190'8" PE 129'6" VCP
132'6" VCP
143'6" PE
244'6" VCP
270'8" PE
131'8" PE140'6" VCP134'6" VCP
253'6" VCP
124'6" VCP
58'UNK57'UNK70'UNK
71'UNK189'UNK
53'UNK
122'UNK
165'UNK
198'6" VCP
100'6" VCP
205'6" VCP
242'6" VCP
297'6" VCP
78'6" VCP192'6" VCP
76'6" VCP68'6" VCP
62'6" VCP
309'6" PVC
258'6" VCP
302'6" VCP
134'6" VCP75'6" VCP
192'6" VCP
160'6" VCP
223'6" VCP
115'6" VCP
163'8" VCP
236'6" VCP 149'6" VCP
223'6" VCP
235'6" VCP
163'6" VCP
108'6" VCP
157'6" VCP
124'UNK
140'6" VCP
206'8" VCP
70'6" VCP64'6" VCP
61'UNK134'6" VCP 226'6" VCP
84'UNK
252'6" VCP
233'6" VCP
125'6" VCP
132'6" VCP
228'6" VCP73'6" VCP186'6" PE114'6" PE
222'6" VCP
144'6" VCP 99'6" VCP
232'8" PE99'6" VCP
182'6" VCP
158'6" VCP37'6" PE91'6" VCP110'6" VCP187'6" VCP
80'6" VCP108'6" VCP
168'6" VCP
91'6" VCP
91'8" VCP
79'8" VCP
21'6" VCP 24'UNK
135'6" UNK
AK/08BI/25
BO/13
AK/35
BO/14
BO/12BO/09BO/10BO/11 BS/37BS/33
BS/29
BS/36
AK/29AAK/29
AK/23AK/24BI/19
BI/22BI/21BI/20
BI/29
BI/24BI/23
BI/14BI/12
AK/25BI/15BI/16
AK/10
AK/09AK/07AK/06AK/2A
AK/03
AK/04
BC/26
BC/23
BS/30 BB/24BC/24
BC/25BB/25BB/10
BB/12
AK/02AK/05
BS/35ABS/35B
BI/33BI/34
AK/36BO/05
BI/07
BI/17B AK/37
BO/62BO/63
BS/59BS/35BI/01
BI/10
BI/02BI/03BI/04BI/05
BI/08BO/01BO/60BO/08
BI/06BS/52
AK/27
AK/26
BI/17BI/17ABI/18BI/27
BI/11
BI/26
BI/09
BO/06BO/04BO/03BO/02
BI/28
BI/31BI/30
BO/56BO/07
BI/32
BO/57
BO/59
BC/20
AK/14
AK/14A
BB/11
BC/21BC/22
BB/13
BB/16
BB/14
BB/15
BI/45
BI/46BI/47
BI/48
I6J6K6I7K7I8J8 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 J7
J7 April 6, 2016

8.k
February 27, 2023

Packet Pg. 404

SAN MATEO COUNTYCITY OF SAN CARLOS
33 637
606
2768
27602765
815
176
68 513
2878
275210750 2744
563
23 166
2873
2757
742 534
632 2884
544
2737730
181
2769
26 415
655
196 531
422
24 754
2 2749
549 538
401
10 56
74236 636
16 720
422
425
6152451
425
158
60 616
538
609
532
5 404
501 417
405
80 2764
2748
72243
410188
180178
2772
760
624
735 541
170
17 30 2756750
649
500
112
11 1138 28
145155 16
15044154135 27
14 150
20105875 15
845
25120
130 119
107
2750
275373844
522
509
165
18 2761
2745
711
18 28
2879 2756
6 2741
529

LOMA RD

CORTEZ RD

S PALOMAR DR

BROMLEY DR

ROLAND AVE

LOS CERROS RD

HERMOSA RD

MONTALVO RD

ESTRADA PL

PALOMAR DRLOMA CT

PALOMAR DR ENCINA RDPALOMAR DR PALOMAR DR

PALOMAR DR
235'6" VCP
299'6" VCP
78'6" VCP
88'6" PVC73'6" PVC65'6" PVC
BO/65BO/64
BO/79BO/78BO/48
BO/66
BI/31BI/30
BO/55
BO/54
BO/53BO/52
J5K5L5J6J7K7 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 K6
K6 April 6, 2016

8.k
February 27, 2023

Packet Pg. 405

CLIFFORDELEMENTARYSCHOOL

CLIFFORD ELEMENTARY SCHOOL

SAN MATEO COUNTYCITY OF SAN CARLOS
2760
20 116135
330
1462 1391
227
8 218 1320
1355123 16115
12561254212752
2744
140214
1325
1378
333
1510
225
18 1252
1340
210
1232229
1262
216
231
230
2737 231
1368
1375335
211215217
227215223
226 1280222
132240
272
317
415
1308
245
275
402
355
186180256
1278
206
1277128211
275
108
1365
401
2815
207
422 321
1381
12 174
131260
324 8
229
251 2302821 234
14 144
1369404417 1400
405
35 2252764 9
2748 40
2729 139
1358
410 119105323
347
250
35261
120
112265
135324287
2756 240
45 2740 200 136
1356
134512323
1116
3830
239
243
1504 208
249
245
216
1506
210
1486 1473
2750 123315
20282
1438
25 226
231230
2853 193235
1306257 1318
148
239 1354250 1305
10 244
2756
15 207211
12751312
1235 13381330
1359285
15 CORDILLERAS CREEK

CORDILLERAS CREEK

CORTEZ RD
DON CT

EDGEWOOD RD

BROMLEY DR

EDGEWOOD RDBROMLEY DR

RAYMOND CT

LAMSHIN LN

EDGEWOOD RD

BELLE ROCHE AVE

UPLAND CT

KRISTA LN

FRANCES LNCLIFFORD AVETIMOTHY DR

LEMOORE DR

SCENIC DRCARMEL LNBRECON CT

CLIFFORD AVE

PALOMAR DRENCINA RDHUBBARD AVESCENIC DR

PALOMAR DRPALOMAR DR
128'6" VCP63'6" VCP75'6" VCP123'UNK122'UNK100'6" VCP 299'6" VCP
78'6" VCP 163'6" VCP
143'6" VCP
154'6" VCP
151'UNK
224'6" VCP140'UNK
61'UNK134'6" VCP
103'6" VCP
226'6" VCP
104'UNK
131'UNK214'6" VCP
252'6" VCP
BO/65BO/64
AK/22AK/34AK/13
AK/33 AK/21
AK/29AAK/29AK/30
AK/17AK/16AK/15AK/12AK/10AK/11
BO/66
AK/18AK/31
AK/28AK/32
BI/31BI/30
BO/55
BO/54
J6K6J7J8 CITY OF SAN CARLOSUNDERGROUND INFRASTRUCTURE0100200300GRAPHIC SCALEFEET THE CITY OF SAN CARLOS ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS FOR UTILITY INFORMATION SHOWN ON THESE MAPS. ALL INFORMATION SHOULD BE FIELD VERIFIED.

DATE PRINTED:

SHADING INDICATES RESIDENTIAL EASEMENT PARCELCREATED BY CALIFORNIA CAD SOLUTIONS, INC. www.calcad.com (209) 578-5580 K7
K7 April 6, 2016

8.k
February 27, 2023

Packet Pg. 406

CITY COUNCIL

STAFF REPORT
MEETING DATE: February 27, 2023
ITEM TITLE: Adopt a Resolution Approving the 2023 On-Call Sewer Replacement Project C1702 Specifications and Authorizing a Call for Bids.

RECOMMENDATION:

Staff recommends that the City Council adopt a Resolution approving the 2023 On-Call Sewer Replacement Project C1702 (“Project”) specifications and authorizing a call for bids.

FISCAL IMPLICATIONS:

There are no fiscal implications associated with this recommendation and no additional appropriation is needed at this time.

Funding for the Project is available in Fiscal Year 2022-23, with an available budget of approximately $791,015.

The engineer’s estimate, with 30% contingency, is approximately $780,000 and sufficient to award and complete the Project. Should additional appropriation be needed, staff will request it at the time the Project is awarded.

BACKGROUND:

Staff recommends that the City Council approve the Project specifications and authorize a call for bids for the Project.

In January 2013, the City completed the Sewer Collection System Master Plan (“Master Plan”), which identified and prioritized sanitary sewer pipelines for replacement and upsizing. In accordance with the Master Plan, staff created the Sewer System Rehabilitation Program (“Program”) to address structurally deficient pipelines identified by the Master Plan. The Program has two projects to address these defects: the Annual Sewer Rehabilitation Project and the On- Call Sewer Replacement Project.

The Annual Sewer Rehabilitation Project addresses sewer system defects in one basin annually on a rotation. This systematic approach ensures that all basins within the City’s sewer system are rehabilitated over time.

Staff maintains a continuous list of defects in need of emergency repair, outside of the scheduled Annual Sewer Rehabilitation Project. The Project addresses emergency repairs needed outside of the basin scheduled for the current year Annual Sewer Rehabilitation Project. The Project also

8.l
February 27, 2023

Packet Pg. 407

repairs defects prior to the Annual Pavement Rehabilitation Project and reduces trenching into newly paved street segments.

Contractors are retained to perform repairs on an as-needed basis through an on-call sewer agreement.

ANALYSIS:

The City Engineer signed the final bid set construction documents on February 7, 2023. The tentative bid opening date is March 21, 2023, with planned award of the Project at the April 10, 2023 City Council meeting.

Staff recommends that the City Council approve the Project specifications and authorize a call for bids for the Project.

ALTERNATIVES:

Options available to the City Council include:

1. Adopt a Resolution approving the 2023 On-Call Sewer Replacement Project C1702 specifications and authorizing a call for bids; or

2. Do not adopt the Resolution; or

3. Provide staff with alternative direction.

Respectfully submitted by:

Steven Machida, Public Works Director
Approved for submission by:
_______________________
Jeff Maltbie, City Manager
ATTACHMENT(S):

1. Resolution

2. 2023 On-Call Sewer Replacement Project Specs

8.l
February 27, 2023

Packet Pg. 408

RESOLUTION NO. 2023 – ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CARLOS APPROVING THE 2023 ON-CALL SEWER REPLACEMENT PROJECT C1702 SPECIFICATIONS AND AUTHORIZING A CALL FOR BIDS.

WHEREAS, staff maintains a continuous list of defects in need of emergency repair, outside of the scheduled Annual Sewer Rehabilitation Project; and WHEREAS, the 2023 On-Call Sewer Replacement Project (“Project”) addresses emergency repairs needed outside of the basin scheduled for the current year Annual Sewer Rehabilitation Project; and
WHEREAS, the Project also repairs defects prior to the Annual Pavement Rehabilitation Project and reduces trenching into newly paved street segments; and WHEREAS, contractors are retained to perform repairs on an as-needed basis through an on-call sewer agreement; and
WHEREAS, the City Engineer signed the final bid set construction documents on February 7, 2023; and
WHEREAS, staff recommends approving the Project specifications and authorizing a call for bids for the Project.

NOW, THEREFORE BE IT RESOLVED, that the San Carlos City Council approves the 2023 On-Call Sewer Replacement Project C1702 specifications and authorizes a call for bids. * * * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Carlos at a scheduled meeting thereof held on the 27th day of February 2023, by the following vote:

AYES, COUNCILMEMBERS:___________________________________________ NOES, COUNCILMEMBERS:___________________________________________ ABSENT, COUNCILMEMBERS:___________________________________________ ________________________________
CITY CLERK of the City of San Carlos
APPROVED:
___________________________
MAYOR of the City of San Carlos

8.l
February 27, 2023

Packet Pg. 409

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA
Public Works Department
600 Elm Street
San Carlos, CA 94070
Contract Documents
For the
2023 On-Call Sewer Replacement Project
CITY PROJECT NO: C1702-23

BID OPENING: March 21, 2023 at 1:30 p.m.

BID SET

8.l
February 27, 2023

Packet Pg. 410

8.l
February 27, 2023

Packet Pg. 411

2023 On-Call Sewer Replacement Project
City Project No. C1702-2
3 DESIGN CERTIFICATION
The Plans and Technical Specifications contained herein have been prepared by, or unde
r the responsible charge of, the following registered person(s):

Prepared by:
_________________________________________________________________ VATSAL PATEL, P.E., SENIOR ENGINEER Date Public Works Department
City of San Carlos
600 Elm Street, San Carlos, CA 94070
(650) 802-4202
Approved for Construction:
___________________________________________________________ GRACE LE, P.E., CITY ENGINEER Date
Public Works Department
City of San Carlos
600 Elm Street, San Carlos, CA 94070
(650) 802-4201
2/7/2023
02/07/2023

8.l
February 27, 2023

Packet Pg. 412

This Page Intentionally Left Blank

8.l
February 27, 2023

Packet Pg. 413

iii

TABLE OF CONTENTS
A. INTRODUCTORY PAGES
Title Page No.

Cover Page i
Design Certifications ii
Table of Contents iii
Notice Inviting Sealed Proposals vii
Instructions to Bidders ix
Schedule of Required Bid Documents and Agreement Forms xi B. BID PROPOSAL
Bid Proposal Cover Page P-1
Bid Proposal Table of Contents P-2
Bid Proposal P-3
Bidding Requirements P-4
Bid Schedule P-6
Designation of Subcontractors P-9
Department of Industrial Relations Registration Requirement P-9 Certifications and Affidavits
Non-Collusion Affidavit P-10
Bidder’s Qualifications P-11
Bidder’s References P-12
Signature Pages P-14
Bidder’s Bond P-16
C. AGREEMENT AND AGREEMENT FORMS
Agreement and Agreement Forms Table of Contents A-1
Public Project Agreement A-2
Exhibit A – Contractor’s Bid Proposal A-11
Exhibit B – Insurance Coverage Form A-12
Resolution of Construction Claims A-13
Agreement Forms
Payment Bond A-15
Performance Bond A-17
Workers Compensation Certification A-19
Certification of Safety Requirements for Contractors and Vendors A-20 Drug-Free Workplace Certification A-21
Escrow Agreement for Security Deposits in Lieu of Retention (Optional) A-22 Guarantee A-24
D. GENERAL PROVISIONS
Section 1 Terms and Definitions GP-1
Section 2 Proposal Requirements and Conditions GP-6 Section 3 Review of Bids, Contract Award and Execution GP-9 Section 4 Scope and Control of the Work GP-14
Section 5 Changes of Work GP-21
Section 6 Control of Materials GP-25
Section 7 Utilities GP-28
Section 8 Prosecution and Progress GP-31
Section 9 Responsibilities of the Contractor GP-40 Section 10 Measurement and Payment GP-55
Section 11 Guarantee GP-61

8.l
February 27, 2023

Packet Pg. 414

iv
E. SPECIAL PROVISIONS
Section 1 Description of Work SP-3
Section 2 Location SP-4
Section 3 Qualification of Bidders SP-4
Section 4 Days & Hours of Operation SP-4
Section 5 Control of Work SP-4
Section 6 Licenses and Permits SP-4
Section 7 Safety and Health Regulations SP-5
Section 8 Safety of Persons and Property SP-6
Section 9 Staging / Construction Area SP-6
Section 10 Contractor’s Plant and Equipment SP-7
Section 11 Traffic Control SP-7
Section 12 Stormwater Pollution Prevention SP-10
Section 13 Water SP-10
Section 14 Power SP-10
Section 15 Dust Control SP-10
Section 16 Cleanup SP-11
Section 17 Clearing and Grubbing SP-11
Section 18 Protection and Restoration of Existing Improvements SP-12 Section 19 Existing Utilities SP-12
Section 20 Utility Coordination SP-13
Section 21 Obstructions SP-14
Section 22 Maintenance of Sewer Service SP-14
Section 23 Resealing of Manholes SP-14
Section 24 Protection of Public Safety SP-14
Section 25 Surcharging of Manholes SP-15
Section 26 Contractor-Related Blockage SP-15
Section 27 Notification of Residents and Merchants SP-15 Section 28 Owner / Contractor Meetings SP-15
Section 29 Record Drawings / Corrected Sewer Maps SP-16 Section 30 Construction Schedule SP-16
Section 31 Daily Work Reports SP-16
Section 32 Submittals SP-17
F. BID ITEM DESCRIPTIONS
G. TECHNICAL PROVISIONS
Section 1 Demolition of Pipelines and Structures TP – 4 Section 2 Dewatering TP – 9
Section 3 Bypassing Wastewater TP – 12
Section 4 Earthwork TP – 14
Section 5 Controlled Low Strength Material TP – 26
Section 6 Geotextile Fabric TP - 31
Section 7 Pipebursting TP – 34
Section 8 Shoring TP – 40
Section 9 Asphaltic Concrete Paving TP – 46
Section 10 Curbs, Gutters, Sidewalks, Curb Ramps, Valley Gutters, and Driveways
TP – 54
Section 11 Traffic Strips and Pavement Markings TP – 58 Section 12 Sanitary Sewer Laterals TP – 60
Section 13 Precast Concrete Manholes TP – 64
Section 14 Sanitary Sewer System Testing TP – 67
Section 15 Sewer Cleaning TP – 71
Section 16 CCTV Inspection of Existing and Rehabilitated Sewers TP – 74 Section 17 Reinforcement Steel TP – 82
Section 18 Cast-in-Place Concrete TP – 88
Section 19 General Piping TP – 98

8.l
February 27, 2023

Packet Pg. 415

v
Section 20 Polyvinyl-Chloride Pipe TP – 101
Section 21 High-Density Polyethylene Pipe TP – 106
H. APPENDICES
A Daily Work Report Form
B City Standard Details

8.l
February 27, 2023

Packet Pg. 416

vi
This Page Intentionally Left Blank

8.l
February 27, 2023

Packet Pg. 417

vii

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA

NOTICE INVITING SEALED PROPOSALS
NOTICE IS HEREBY GIVEN that sealed proposals or bids will be publicly opened, examined and announced on March 21, 2023 at the hour of 1:30 p.m. by the City Clerk of the City of San Carlos for the 2023 On-Call Sewer Replacement Project, No. C1702-23 . City Hall is closed to the public every Wednesday and Friday. No Pre-Bid meeting has been scheduled for this project.

A Class A, Contractor’s License is required for this work. Work will be done and payments will be made in accordance with provisions more particularly described in the plans and specifications adopted by the San Carlos City Council on February 27, 2023 and on file in the office of the City Clerk.

The scope of work generally includes the following:

Pipeline and manhole emergency repairs; Pipe replacement by way of trenchless pipe bursting; Pumping and/or diversion of sewer flows; Temporary traffic control; Manhole cover readjustment or repair; Supported activities and other miscellaneous work related to sanitary and storm drain sewer systems including, but not limited to, closed-circuit television (CCTV) inspection, manhole and pipeline inspection, cleaning and removal of debris, testing, and coordinating with other agencies to obtain construction permits.

Bids are required for the entire work described herein in accordance with the instructions to bidders. The Engineer’s Estimate is between $500,000 and $600,000.

Bids must be accompanied by a Proposal guarantee amounting to ten (10%) percent of the bid as described in the specifications. Said guarantee shall be forfeited to the City in case the bidder depositing the same does not, within fifteen days after written notice that the contract has been awarded to the Contractor (1) enter into a contract with the City and (2) furnish Performance and Payment Bonds as described in the specifications.

The City Council reserves the privilege of rejecting any and all proposals or to waive any irregularities or informalities in any proposals or in the bidding. No bidder may withdraw their proposal for a period of ninety (90) calendar days after the date set for opening of proposals.

As a “Public Works” project and pursuant to Section 1773 of the Labor Code, the general prevailing wage rates for San Mateo County shall apply to this contract, as determined by the Director of the California Department of Industrial Relations.

Plans and specifications, forms of proposals, bonds and contracts may be inspected or obtained from ARC
Document Solutions at 829 Cherry Lane, San Carlos, CA 94070, (650) 631-2310; email at sancarlos@e- arc.com; or visit the City of San Carlos Website at www.cityofsancarlos.org . Bidders must register with ARC Document Solutions to obtain further information.

Bidders are directed to the Instructions for Bidders for additional contract requirements Dated: _____________________ /s/ CRYSTAL MUI
City Clerk
_____________________

8.l
February 27, 2023

Packet Pg. 418

viii
This Page Intentionally Left Blank

8.l
February 27, 2023

Packet Pg. 419

ix

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA

INSTRUCTIONS TO BIDDERS

1. Proposal Requirements: Bidder's attention is directed to the General Provisions of these Specifications for the requirements and conditions which must be adhered to in the preparation of the proposal form and submission of this proposal.

2. Receipt of Bids and Bid Opening: Proposals shall be received at the office of the City Clerk, 600 Elm Street, San Carlos, CA 94070, not later than the bid deadline described in the Notice Inviting Sealed Proposals. Proposals shall be submitted in a sealed envelope, plainly marked on the outside “2023 On-Call Sewer Replacement Project, No. C1702-23”.

3. Time of Completion and Liquidated Damages: The term of the contract shall be for one year or until all work as defined in the schedule of quantity has been completed, whichever comes first from the award date. If the Contractor fails to complete the work within the time limit specified in each individual project, the Contractor shall pay liquidated damages to the City, computed at the rate of Five Hundred Dollars ($500) for each calendar day beyond the specified time limit until the project is completed.

Bid Security: Pursuant to California Public Contract Code Section 20170, each proposal shall be accompanied by a bid security in the form of cash, cashier’s or certified check, or bidder’s bond made payable to the “City of San Carlos” for an amount equal to at least ten percent (10%) of the Bid Amount and no bid shall be considered unless such security is enclosed therewith.

5. Bid Guarantee: No bid shall be withdrawn except as provided for pursuant to Public Contract Code Section 5103, and the bidder shall guarantee the Total Bid Price for a period of ninety (90) calendar days from the date of the bid opening.

6. Contractor’s License: Bidders are to be licensed in accordance with the provisions of the “Contractor’s License Law,” Chapter 9 of Division 3 of the State Business and Professions Code. In addition, at the time of submitting the bid, bidder must have the following classification of contractor’s license: Class A, Contractor’s License.

7. Additional Registration and Licensing Requirements: In accordance with Labor Code Section 1725.5, Contractor and all Subcontractors shall be registered with the California Department of Industrial Relations (DIR) as a condition of being listed on the proposal form. All 2nd and lower tier subcontractors working on the project shall be registered with the Department of Industrial Relations prior to the work being performed. Contractor and all Subcontractors shall also obtain a City business license prior to the work being performed.

8. Prevailing Wage: The work contemplated by this contract is a “public work” subject to prevailing wages under California Labor Code Section 1770 et. seq. The successful bidder will be required to pay not less than the prevailing rate of per diem wages as determined by the California Department of Industrial Relations or Federal Minimum Wage Rates as determined by the United States Secretary of Labor in effect on the date the work is performed.

8.l
February 27, 2023

Packet Pg. 420

x

9. Bonds and Insurance: All contractors are required to furnish to the City faithful performance, labor and materials, and 2-year warranty bonds and insurance, as required in the specifications.

10. Security Substitution: Pursuant to California Public Contract Code Section 22300, and at the request and expense of the Contractor to whom the Contract is awarded, securities of a value equivalent to the retention amount, in a form approved by the City, shall be permitted in substitution for money withheld by the City to ensure performance under the Contract.

11. Pre-Bid Conference: No pre-bid conference has been scheduled for this project.

12. Requests for Clarification and Project Communication: In the event the bidder has any questions as to the meaning of any part of the plans and specifications, or if the bidder finds any error, inconsistency, or ambiguity in the Contract Documents, the bidder shall make a written request for clarification prior to submitting its bid. All questions and comments regarding the plans and specifications should be directed to the Project Manager indicated below and will only be responded to if received in writing at least five (5) working days before the bid opening. Questions received after this time and date may not be addressed.

City of San Carlos – Public Works Department
600 Elm Street, San Carlos, CA 94070
Attention: Evan Cai, Associate Engineer
[email protected]
Telephone: (650) 802-4196
Fax: (650) 595-4704

13. These “Instructions to Bidders” are hereby made a part of the Contract Documents.

8.l
February 27, 2023

Packet Pg. 421

xi

SCHEDULE OF REQUIRED

BID DOCUMENTS AND AGREEMENT FORMS
Submit with Bid Proposal - The following documents must be completed, signed and submitted as part of the Bid Proposal, prior to the bid opening:

Completed Bid Proposal consisting of:

A. Bid Schedule
B. Designation of Subcontractors
C. Certifications and Affidavits:

1. Non-Collusion Affidavit

2. Bidder’s Qualifications

3. Bidder’s References

4. Bidder’s Personnel
D. Signature Pages
E. Bid Guarantee (Bid Bond attached)
F. Addendum, if any (not attached) – signature page to be signed and submitted by bidder.

Submit Prior to Notice to Proceed -The following documents must be completed, signed and submitted after approval and award of the Contract, prior to the Notice to Proceed:

A. Agreement
B. Payment Bond
C. Performance Bond
D. Insurance Endorsements

1. General Liability

2. Automobile Liability

3. Worker’s Compensation
E. Certifications

1. Workers Compensation

2. Safety Requirements for Contractors and Vendors

3. Drug-Free Workplace
Submit Prior to Final Acceptance - The following documents must be completed, signed and submitted prior to final acceptance:

A. Guarantee
B. Stop Notice Releases, if any (form not included)
C. Record Drawings

8.l
February 27, 2023

Packet Pg. 422

xii
This Page Intentionally Left Blank

8.l
February 27, 2023

Packet Pg. 423

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-1 Project No. C1702-23

CITY OF SAN CARLOS

PUBLIC WORKS DEPARTMENT
600 Elm Street
San Carlos, CA 94070

BID PROPOSAL
FOR:
"2023 On-Call Sewer Replacement Project”
City Project No. C1702-23
IN

CITY OF SAN CARLOS, COUNTY OF SAN MATEO

STATE OF CALIFORNIA
NOTE: All portions of all pages included within this section, and acknowledgement of receipt of any issued addenda must be properly completed, signed, and submitted with the bid. Failure to do so may result in the bid being deemed non-responsive by the City.

8.l
February 27, 2023

Packet Pg. 424

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-2 Project No. C1702-23

BID PROPOSAL

TABLE OF CONTENTS
Bid Proposal Cover Page...................................................................................... P-1 Bid Proposal Table of Contents ............................................................................ P-2 BID PROPOSAL PAGES TO BE SUBMITTED WITH BID:

Bid Proposal.......................................................................................................... P-3 Bidding Requirements........................................................................................... P-4 Bid Schedule......................................................................................................... P-6 Designation of Subcontractors.............................................................................. P-8 Department of Industrial Relations Registration Requirement.............................. P-8 Certifications and Affidavits
Non-Collusion Affidavit ................................................................................... P-9 Bidder’s Qualifications..................................................................................... P-10 Bidder’s References........................................................................................ P-11 Signature Pages.................................................................................................... P-12 Bid Bond ............................................................................................................... P-14

8.l
February 27, 2023

Packet Pg. 425

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-3 Project No. C1702-23

BID PROPOSAL
"2023 On-Call Sewer Replacement Project”
CITY PROJECT NO. C1702-23
Bid To: Honorable Mayor and City Council
City of San Carlos, City Hall
San Carlos, CA 94070
Bid From:

Bidder’s Company Name:

Contact Person:

Business Street Address:

City, State, Zip Code:

Phone No.: ( )
E-mail: __ __________________
Contractor License No.:

Contractor License Expiration Date: ____
Dear Mayor and Members of the City Council:

I, as bidder, declare that I have satisfied myself as to the actual conditions and requirements of the work by careful examination of the location of the proposed work, by examination of the plans and specifications including the Instructions to Bidders, and by other measures, and that after submission of the bid, I will not dispute, complain or assert that there was any misunderstanding in regards to the nature or amount of work to be done.

I hereby certify that only those parties interested in this proposal as principals are named in this proposal and that this bid is genuine, and not sham, collusion, or made in the interest or in behalf of any person not named. I have not directly or indirectly induced or solicited any other bidder, person, firm or corporation to put in a sham bid, or refrain from bidding, and have not in any manner sought by collusion to secure for myself an advantage over any other bidder.

I agree that if this proposal is accepted, I will contract with the City of San Carlos in the form of agreement proposed, will provide all bonds and insurance certificates as required by the agreement and will furnish all equipment and materials and perform all the labor required to complete the work in accordance with the plans, specifications and other contract documents, for the unit or lump sum prices set forth in the Bid Schedule.

8.l
February 27, 2023

Packet Pg. 426

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-4 Project No. C1702-23
I have carefully checked all of the figures in the Bid Schedule and understand that the City shall not be responsible for any errors or omissions on my part in making up this bid. I agree that this bid may not be withdrawn for a period of ninety (90) calendar days from the date of the bid opening and that the City reserves the right to reject any or all bids, waive any informality in bids received, and may at its option make the award that in the judgment of the City is to the best interest of the City.

BIDDING REQUIREMENTS
The work to be done and referred to here is in the City of San Carlos, County of San Mateo, State of California, and shall be constructed in accordance with all provisions of the project specifications and project plans including: any addenda; the Instructions to Bidders, the Agreement; the Standard Specifications and Standard Plans of the California Department of Transportation, current edition; the Labor Surcharge and Equipment Rental Rates; and payment of not less than the higher of the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations or Federal minimum wage rate as predetermined by the United States Secretary of Labor in effect on the date the work is performed.

For each of the various contract items of work designated on the Bid Schedule, the bidder shall set forth a unit or lump sum price which the bidder shall then use to calculate and designate a total cost for each item of work based upon the designated estimate of the quantities of work to be done, all in clearly legible figures in the respective spaces of the Bid Schedule provided for this purpose.

The bidder shall include in the unit or lump sum prices paid for the various contract items of work full compensation for conforming to the requirements of the Contract Documents and for completing all of the work required. No additional compensation shall be granted for any additional items unless categorized and approved as extra work under the terms of the agreement.

The estimate of construction quantities set forth in the Bid Schedule is approximate only, being given only as a basis for the comparison of bids, and the City does not expressly or by implication agree that the actual amount of work will correspond with those estimated quantities. The City reserves the right to increase the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or expedient by the Engineer. There shall be no claim for damage or loss of anticipated profit for any bid item omitted in its entirety, and payment will only be made on the basis of actual quantities of work performed.

If the City accepts this proposal and the bidder fails to enter into the contract and/or fails to furnish bonds as required by the specifications with sureties satisfactory to the City within ten (10) calendar days after the bidder has received notice from the City that the contract has been awarded, the City may, at its option, determine that the bidder has breached and abandoned the contract, and thereupon, the bid security accompanying this proposal shall be forfeited and become the property of the City.

The Notice to Proceed will not be issued until after the contract has been fully executed. The contractor shall commence the work under the contract within ten (10) days following the date of the Notice to Proceed, or as otherwise specified in the project specifications or negotiated with the City, and shall diligently prosecute the project to completion within the time specified. The contract completion period is inclusive of the time needed for material delivery.

8.l
February 27, 2023

Packet Pg. 427

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-5 Project No. C1702-23
Bidder shall comply with the requirements of the California Labor Code, including sections 1770 et seq., and pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the office of the City Engineer, which copies shall be made available to any interested party upon request. The Contractor shall post a copy of such determination at the job site.

As required by Section 6705 of the California Labor Code and in addition thereto, for any excavation of any trench or trenches five feet (5’) or more in depth, the Contractor shall submit to the Engineer for acceptance, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. Structural calculations prepared, stamped and signed by a Registered Engineer licensed to practice in the State of California shall accompany the plan to verify the structural safety and adequacy of the sheeting, shoring and bracing to be used on the project. No such plan shall allow any shoring, sloping or a protection system less effective than that required by the Construction Safety Orders of the State Division of Occupational Safety and Health.

In accordance with the provisions of Section 1860 of the Labor Code, prior to performing work on the Contract, each Contractor to whom a public works contract is awarded shall sign and file with the City the Worker’s Compensation Certification included in the “Agreement and Agreement Forms” section of these specifications.

Bidder’s attention is directed to Section 2 of the General Provisions for additional information and requirements pertaining to the submission of a bid, and which is incorporated here by reference.

Bidder’s attention is directed to Section 2.13, “Required Contractor and Subcontractor Registration,” of the General Provision. All contractors shall register with the Department of Industrial Relations according to Labor Code Section 1725.5.

Any protest of the proposed contract award must be submitted in writing to the City no later than 5:00 p.m. on the fifth business day following the date of the bid opening. Bidder is directed to the “Bid Protest Procedure” Section of the General Provisions for additional information.

8.l
February 27, 2023

Packet Pg. 428

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-6 Project No. C1702-23

BID SCHEDULE
Bids are to be submitted for the entire work. All applicable sales taxes, state and/or federal, and any other special taxes, patent rights or royalties are included in the prices quoted in the bid.

In the case of a discrepancy between the product of the “Estimated Quantity” and the “Unit Price” with the “Item Total”, the product of the “Estimated Quantity” and the “Unit Price” shall prevail and the figure shown as the “Item Total” shall be adjusted accordingly, except as provided in cases involving (a) or (b) below:
(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount entered in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price; (b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the item total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage-wise the unit price or item total in the Engineer’s Estimate.

If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided.

In the case of a discrepancy between the sum of the figures in the item total column (adjusted per the previous paragraphs, if necessary) and the amount set forth as the total base bid amount, the sum of the figures in the item total column shall prevail and the amount shown as the total base bid amount shall be adjusted accordingly.

8.l
February 27, 2023

Packet Pg. 429

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-7 Project No. C1702-23
BID ITEMS ARE AS FOLLOWS:

"2023 On-Call Sewer Replacement Project”

PROJECT NO. C1702-23

Item
No.

Item
Description
Estimated
Quantity

Unit
Unit
Price
Item
Total
1 Mobilization & Demobilization 10 EA
$

$
2 Traffic Control 10 EA
$

$
3 Sheeting, Shoring and Bracing 6 EA $ $
4 Utility Verification and Pothole
Utility in Potential Conflict 10 EA
$

$
5 Rehabilitate Existing Sanitary
Sewer Manhole 2 EA $ $
6 Modify Existing Manhole
Channels and Base 8 EA
$

$
7 Replace Frame and Cover 1 EA
$

$
8 New 48” Sanitary Sewer
Manhole, with or without drop
connection
3 EA
$

$
9 Connect to Existing Sanitary
Sewer Manhole 8 EA $ $
10 Install Pipe Stub (5-foot Min.)
and Reconnect Existing Pipes 2 EA $ $
11 Abandon Existing Sanitary
Sewer Manhole 1 EA $ $
12 Remove and Replace 6”
Sanitary Sewer Main (Open
Cut)
120 LF $ $
13 Abandon Existing Sanitary
Sewer Main or Lateral 200 LF $ $
14 Install New Sewer Lateral 5 EA $ $
15 Reconnect Existing Sanitary
Sewer Lateral 20 EA $ $
16 Manhole Vacuum Testing 3 EA $ $
17 Compaction Testing 1 LS $ $
18 Point Repair (Up to 6 feet in
Length) 12 EA
$

$

8.l
February 27, 2023

Packet Pg. 430

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-8 Project No. C1702-23
19 Additional Point (beyond 6 feet
in length) 50 LF
$

$
20 Remove and Replace 6”
Sanitary Sewer Main (Pipe
Burst)
800 LF
$

$
21 Excavate Bedrock (Revocable) 1000 CF $ $

Total Bid Amount: $___________________

Notes:

1. The Contract will be compared and awarded on the basis of the Total Bid Amount.

2. All items on the Bid Schedule must be bid. Partial bids will not be accepted.

3. The City reserves the right to reject all bids for any reason whatsoever.

4. Issuance of the “Notice to Proceed” will constitute the beginning of the Contract.

8.l
February 27, 2023

Packet Pg. 431

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-9 Project No. C1702-23

DESIGNATION OF SUBCONTRACTORS
The Contractor shall perform work equaling at least 30 percent of the value of the original total bid with the Contractor’s own employees and equipment, owned or rented, with or without operators.

In accordance with the Subletting and Subcontracting Fair Practices Act, Public Contract Code sections 4100 et seq . (the “Subcontracting Act”), the Bidder hereby certifies and submits, as required by law, the following concerning subcontractors:

1. The portion of the work, which will be done by each such subcontractor; and

2. The name and location of the place of business of each subcontractor who will perform work or labor, fabricate a portion of the work or improvement according to detailed drawings in the project plans, or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (0.5%) of the Contractor’s total bid.

Portion of Work to be
Performed by Subcontractor
Subcontractor Name,
Address and License Number
(License No. Required under AB 44)
Registered
with DIR?
 check if yes

1. 2.

3. 4.

5. 6.

7. (For additional Subcontractors, attach copies of this sheet as necessary) NOTE: T HIS CERTIFICATE MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.  DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION REQUIREMENT In accordance with Labor Code Section 1725.5, all contractors and subcontractors listed on a public works bid proposal must be registered with the DIR.

8.l
February 27, 2023

Packet Pg. 432

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-10 Project No. C1702-23

NON-COLLUSION AFFIDAVIT
Title 23 United States Code Section 112 and
Public Contract Code Section 7106
State of California )
) ss.

County of _______________ )
(name of person signing affidavit), being first duly
sworn, deposes and says under penalty of perjury under the laws of the State of California, that he/she/theyhave the right, power, legal capacity, and authority to execute this Affidavit as (sole owner, partner, president, secretary, etc) of
(legal name of Bidder), the Bidder,
that the Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the Bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in any false or sham Bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham Bid, or that anyone shall refrain from Bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid price, or of that of any other Bidder, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in the Bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, Bid depository, or to any member or agent thereof to effectuate a collusive or sham Bid.

IN WITNESS WHEREOF, the undersigned, as bidder, represent and warrant that they have the right, power, legal capacity, and authority to enter into and execute this document on behalf of the Bidder, and have executed this document by setting hereto their names, titles and signature. (Signature of Representative of Bidder)
Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________
My Commission expires __________________, 20_____ (Seal) NOTE: T HIS AFFIDAVIT MUST BE COMPLETED AND RETURNED AS PART OF THE CONTRACTOR’S BID PROPOSAL.

8.l
February 27, 2023

Packet Pg. 433

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-11 Project No. C1702-23
BIDDER’S QUALIFICATIONS
The following statements as to the financial qualifications and experience of the Bidder are submitted as a part of this Bid and the Bidder guarantees the truthfulness and accuracy of the information. Pursuant to Public Contract Code 10165, financial statements and experience questionnaires are not public records and are not open to public inspection.

Financial Data
Reference is hereby made to the following bank or banks as to the financial responsibility of the bidder.

NAME OF BANK ADDRESS
Experience Data
The Bidder has been engaged in the contracting business, under the present business name for ________ years. Experience in work of a nature similar to that covered in this Bid extends over a period of __________ years.

The Bidder as a Contractor has never failed to satisfactorily complete an awarded contract from a governmental entity, except as follows: (Name all exceptions and reasons therefore):

Bidder’s Personnel
The following is a list of key personnel including an listing of the person’s knowledge, ability or trade along with a brief description of their experience. If Bidder is awarded the Contract, it is understood that the work will be directed and actively supervised by one of these persons.

List of Personnel Knowledge/Skills Experience

8.l
February 27, 2023

Packet Pg. 434

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-12 Project No. C1702-23
BIDDER’S REFERENCE
List at least three (3) projects below which the Bidder has performed comparable work within the last three (3) years of similar size and complexity that indicate the Bidder’s experience as a Contractor capable of performing a sewer replacement project. The Contractor must have successfully pipe burst 300 sanitary sewer laterals and 2,000 feet of sanitary sewer mains, and have 3 years of experience involving pipe bursting. Failure to provide this information with the Bid shall render the Bid non-responsive and shall be the basis for rejection of the Bid.

Provide a contact person and description of the project, or other such information that will demonstrate the ability to vigorously prosecute the work.

1. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

2. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

3. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

8.l
February 27, 2023

Packet Pg. 435

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-13 Project No. C1702-23

SIGNATURE PAGES
The terms and conditions of the final contract when executed shall control and supersede anything herein to the contrary or inconsistent with such contract.

The bidder has inspected the site of the propose work in order to satisfy the bidder, by personal examination, or by such other means as the bidder prefers, of the location of the proposed work and as to the actual conditions of and at the work site. The bidder hereby offers to furnish all labor, materials, equipment, transportation, and services necessary to complete the work on this project in accordance with the Contract Documents and to complete all requirements of the Contract Documents for the sums quoted in this Bid.

Addenda:
(if any) bidder has received and examined all addenda issued during the bid period and agrees that all addenda shall be made a part of the Contract Documents. The bidder acknowledges receipt and incorporation of all impacts resulting from all addenda issued by inserting the number of each addendum below OR by signing and submitting with the bid proposal the signature page from each addendum.

Addendum Nos. _____, _____, _____, _____, _____, _____, _____, _____ Bidder’s Guarantee:

In accordance with Public Contract Code Section 20170, accompanying this Bid is _______________ (insert the word “Cash”, “Cashier’s Check”, “Certified Check” or “Bidder’s Bond” as the case may be) made payable to the City of San Carlos in the amount of ___________________________________________________($_______________) equal to at least ten percent (10%) of the total amount of this bid. This amount is given as a guarantee that, in case the undersigned defaults in executing a contract and/or furnishing the necessary bonds after contract award, the said guarantee and the money payable thereon shall become and remain the property of the City as liquidated damages.

Company Profile:

The names of all persons interested in the foregoing bid as principals are as follows:
(Note: If bidder or other interested person is a corporation, state the legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if partnership, state true name of firm, also names of all individual partners composing firm; if bidder or other interested person is an individual, state first and last name in full).

Firm Name:

Business Address:

Names and Titles of Company Officers:

1. 2.

3. 4.

8.l
February 27, 2023

Packet Pg. 436

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-14 Project No. C1702-23
Proposal Execution:

IN WITNESS WHEREOF, the undersigned, as bidder, represent and warrant that they have the right, power, legal capacity and authority to enter into and execute this document on behalf of the Bidder, and have executed this document by setting hereto their names, titles, and signatures. The representations made herein, including but not limited to the above contractor’s license, expiration date and name of bidder, are true and correct, shall be complied with and are made under penalty of perjury.

IF SOLE OWNER, sign here:

I sign as sole owner of the business named above.___________________________ Social Security Number:_________________________________________________ Employer Identification Number:___________________________________________ IF PARTNERSHIP, sign here:

The undersigned certify that we are partners in the business named above and that we sign this contract proposal with full authority to do so. (one or more partners sign) ______________________________________________________________________ ______________________________________________________________________ Federal Tax Identification No. (EIN):_________________________________________ State Tax Identification No.:_______________________________________________ IF CORPORATION, execute here:

The undersigned certify that they sign this contract proposal with full and proper authorization to do so.

Corporate name _________________________________________________________ By_____________________________________ (Title) _________________________ By_____________________________________ (Title) _________________________ Incorporated under the laws of the State of ___________________________________ Federal Tax Identification No. (EIN):_________________________________________ State Tax Identification No.:_______________________________________________ Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________
My Commission expires __________________, 20_____ (Seal)

8.l
February 27, 2023

Packet Pg. 437

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-15 Project No. C1702-23
BIDDER’S BOND
To Accompany Contract Proposal
KNOW ALL PERSONS BY THESE PRESENTS:

That we, the undersigned _________________________________________, as principal and __________________________________, as surety, are held and firmly bound unto the City of San Carlos as OWNER in the penal sum of TEN PERCENT (10%) of the total amount of the bid of the principal, for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.

The condition of the above obligation is such that whereas the Principal has submitted to OWNER a certain BID attached hereto and hereby made a part hereof to enter into a contract in writing, for the 2023 On-Call Sewer Replacement, City Project No. C1702-23.

NOW, THEREFORE
(a) If said BID shall be rejected, or
(b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BIDS including all required bonds for faithful performance and labor and material, as well as all required evidence of insurance) then this obligation shall be void, otherwise the same shall remain in force and effect.

In the event the City brings suit upon this Bond, surety shall pay reasonable attorney’s fees and costs incurred by the City in such suit.

The Surety, for value received, stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the City of San Carlos may accept such BID; and said Surety does hereby waive notice of any such extension.

IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, this day and year first set forth.

By: (L.S.) By:
(Principal) (Seal) (Surety) (Seal) Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________ (Seal) My Commission expires __________________, 20_____
IMPORTANT: Surety companies executing BONDS must be authorized to transact Surety insurance in the State of California. If Contractor is Partnership, all partners should execute BOND.

8.l
February 27, 2023

Packet Pg. 438

Bid Proposal 2023 On-Call Sewer Replacement Project
Page P-16 Project No. C1702-23
This Page Intentionally Left Blank

8.l
February 27, 2023

Packet Pg. 439

Agreement 2023 On-Call Sewer Replacement Project
Page A-1 Project No. C1702-23

AGREEMENT AND AGREEMENT FORMS

TABLE OF CONTENTS
Agreement for Public Projects .................................................................................... A-2 Exhibit A: Contractor’s Bid Proposal ......................................................................... A-10 Exhibit B: Insurance Coverage .................................................................................. A-11 Resolution of Construction Claims.............................................................................. A-12 Agreement Forms
Payment Bond................................................................................................. A-14 Performance Bond .......................................................................................... A-16 Workers Compensation Certification .............................................................. A-18 Certification of Safety Requirements for Contractors and Vendors ................ A-19 Drug Free Workplace Certification .................................................................. A-20 Escrow Agreement for Security Deposits in Lieu of Retention (Optional)....... A-21 Guarantee ....................................................................................................... A-23

8.l
February 27, 2023

Packet Pg. 440

Agreement 2023 On-Call Sewer Replacement Project
Page A-2 Project No. C1702-23

AGREEMENT FOR PUBLIC PROJECTS
This Agreement is made and entered into as of __________________ by and between the City of San Carlos hereinafter called "CITY" and ____________________ hereinafter called "CONTRACTOR.”

RECITALS
This Agreement is entered into with reference to the following facts and circumstances:

A. That CITY desires to engage CONTRACTOR to provide a product and/or services to the CITY;
B. That CONTRACTOR is qualified to provide the product and/or services to the CITY and; THEREFORE, the CITY has elected to engage CONTRACTOR upon the terms and conditions as hereinafter set forth.

1. Services. The services to be performed by CONTRACTOR under this Agreement are described in Exhibit A, the CONTRACTOR’S bid proposal which is, by this reference, incorporated herein and made a part hereof as though it were fully set forth herein.

Performance of the services specified in said Exhibit is hereby made an obligation of CONTRACTOR under this Agreement, subject to any changes that may be made subsequently hereto upon the mutual written agreement of the said parties.

Where in conflict, the terms of this Agreement supersede and prevail over any terms set forth in Exhibit A.

2. Term; Termination. (a) The term of this Agreement shall commence upon the date hereinabove written and shall expire upon the date enumerated in Exhibit A, delivery of the product or completion of performance of services hereunder by CONTRACTOR, whichever date shall first occur. (b) Notwithstanding the provisions of (a) above, CITY may terminate this Agreement without cause by giving written notice not less than thirty (30) days prior to the effective date of termination, which date shall be included in said notice. CITY shall compensate CONTRACTOR for any product delivered and/or for services rendered, and reimburse CONTRACTOR for costs and expenses incurred, to the date of termination, calculated in accordance with the provisions of paragraph 3. In ascertaining the services actually rendered to the date of termination, consideration shall be given both to completed work and work in process of completion. Nothing herein contained shall be deemed a limitation upon the right of CITY to terminate this Agreement for cause, or otherwise to exercise such rights or pursue such remedies as may accrue to CITY hereunder.

8.l
February 27, 2023

Packet Pg. 441

Agreement 2023 On-Call Sewer Replacement Project
Page A-3 Project No. C1702-23

3. Compensation; Expenses; Payment. CITY shall compensate CONTRACTOR for all products supplied or services performed by CONTRACTOR hereunder as shown in Exhibit A attached hereto and by this reference incorporated herein.

Notwithstanding the foregoing, the combined total of compensation and reimbursement of costs payable hereunder shall not exceed the sum of __________________$_________, as provided in the approved bid documents or in this Agreement unless additional amounts have been authorized in the acceptance of the bid and approved in advance of supplying the product, performing the services or incurring the costs and expenses by CITY’s City Manager (for contracts less than $175,000 or authorized by City Council action for contracts $175,000 or more by motion duly made and carried).

Compensation and reimbursement of costs and expenses hereunder shall be payable upon CONTRACTOR meeting contract milestones as defined in Exhibit A. Billing shall include an itemized statement, briefly describing by task and labor category or cost/expense items billed.

4. Contractor affirms that its employees and contractors comply with California Prevailing Wage Law.

5. Additional Services. In the event the public project requires the delivery of additional products or performance of additional services not otherwise included within Exhibit A, such products or services must be authorized in advance by CITY’s City Manager (for contracts less than $175,000 or authorized by City Council action for contracts $175,000 or more. Such amendment to this Agreement shall include a description of the project or services to be performed thereunder, the maximum compensation and reimbursement of costs and expenses payable therefore, the time of performance thereof, and such other matters as the parties deem appropriate. Any additional services causing the total contract price to exceed $175,000, shall require approval by the City Council. Except to the extent modified by written amendment, all other terms and conditions of this Agreement shall be deemed incorporated in each such amendment.

6. Records. CONTRACTOR shall keep and maintain accurate records of products delivered or of all time expended in performing services and costs and expenses incurred relating thereto. Said records shall be available to CITY for review and copying during regular business hours at CONTRACTOR’s place of business or as otherwise agreed upon by the parties.

7. Authorization. This Agreement becomes effective when endorsed by both parties in the space provided below.

8. Reliance on Specialized Professional Skill of CONTRACTOR. CONTRACTOR represents that it has the necessary professional skills to perform the services required and the CITY shall rely on such specialized skills of the CONTRACTOR to do and perform the work. In performing services hereunder CONTRACTOR shall adhere to the standards generally prevailing for the performance of services similar to those to be performed by CONTRACTOR hereunder.

8.l
February 27, 2023

Packet Pg. 442

Agreement 2023 On-Call Sewer Replacement Project
Page A-4 Project No. C1702-23

9. Documents. All documents, plans, drawings, renderings, and other papers, or copies thereof, as finally rendered, prepared by CONTRACTOR pursuant to the terms of this Agreement, shall, upon preparation and delivery to CITY, become the property of CITY

10. Relationship of Parties. It is understood that the relationship of CONTRACTOR to the CITY is that of an independent contractor and all persons working for or under the direction of CONTRACTOR are its agents or employees and not agents or employees of the CITY.

11. Schedule. CONTRACTOR shall adhere to the schedule set forth in Exhibit A; provided, that CITY shall grant reasonable extensions of time for the delivery of products or performance of services occasioned by governmental reviews of CONTRACTOR’s work product or other unavoidable delays; provided, further, that such unavoidable delay shall not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, CONTRACTOR’s officers or employees.

CONTRACTOR acknowledges the importance to CITY of timely delivery of products or services and agrees to put forth its best professional efforts to perform in a manner consistent with that schedule.

12. Indemnity. CONTRACTOR shall indemnify, defend, and hold harmless City, its officers, employees, agents and volunteers from and against all liability, loss, damage, expense, and cost (including, without limitation, reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR’s negligence, recklessness, or willful misconduct in the performance of work hereunder, or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage caused by the active negligence or willful misconduct of the City. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

Nothing herein contained shall be construed to require CONTRACTOR to indemnify CITY, its officers, employees, agents and volunteers against any responsibility or liability in contravention of Section 2782 of the California Civil Code.

13. Insurance. CONTRACTOR shall acquire and maintain Workers’ Compensation, employer’s liability, commercial general liability, owned and non-owned and hired automobile liability insurance coverage relating to CONTRACTOR’s services to be performed hereunder covering CITY’s risks in form subject to the approval of the City Attorney and/or CITY’s Risk Manager. The minimum amounts of coverage corresponding to the aforesaid categories of insurance per insurable event shall be as follows:

Insurance Category Minimum Limits
Workers’ Compensation statutory minimum

8.l
February 27, 2023

Packet Pg. 443

Agreement 2023 On-Call Sewer Replacement Project
Page A-5 Project No. C1702-23
Employer’s Liability $1,000,000 per accident for bodily injury or disease. Contractor shall
submit to City a Waiver of
Subrogation endorsement in favor of
City, its officers, agents, employees,
and volunteers.

Commercial General Liability
per occurrence for Liability bodily
injury, personal injury, and property
damage, including without limitation,
blanket contractual liability and
coverage for explosion, collapse and
underground property damage
hazards. If a general aggregate limit
applies, either the general aggregate
limit shall apply separately to this
project/location or the general
aggregate limit shall be twice the
required occurrence limit. Coverage
must be at least as broad as
Insurance Services Office form CG
00 01.

Automobile Liability
per accident for bodily injury and
property damage (coverage required
to the extent applicable to
CONTRACTOR’s vehicle usage in
performing services hereunder)
Concurrently with the execution of this Agreement, CONTRACTOR shall furnish CITY with certificates and copies of information or declaration pages of the insurance required hereunder and, with respect to evidence of commercial general liability and automobile liability insurance coverage, original endorsements:
(a) Precluding cancellation or reduction in per occurrence limits before the expiration of thirty (30) days (10 days for nonpayment) after CITY shall have received written notification of cancellation in coverage or reduction in per occurrence limits by first class mail;
(b) Contractor’s general liability policies shall be primary and non-contributory, and be endorsed using Insurance Services Office form CG 20 10 to provide that City and its officers, officials, employees, and agents shall be additional insureds under such policies. An endorsement providing completed operations coverage for the additional insured, ISO form CG 20 37, is also required.

8.l
February 27, 2023

Packet Pg. 444

Agreement 2023 On-Call Sewer Replacement Project
Page A-6 Project No. C1702-23
Claims Made Policies
If any of the required policies provide claims-made coverage:

1. The Retroactive Date must be shown, and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the CONTRACTOR must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.

Verification of Coverage
CONTRACTOR shall furnish the CITY with original certificates and amendatory endorsements effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the CITY before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONTRACTOR’s obligation to provide them. The CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Waiver of Subrogation
CONTRACTOR hereby grants to CITY a waiver of any right to subrogation which any insurer of said CONTRACTOR may acquire against the CITY by virtue of the payment of any loss under such insurance. This provision applies regardless of whether or not the CITY has requested or received a waiver of subrogation endorsement from the insurer.

Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.

Special Risks or Circumstances
CITY reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Coverage
It is a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be made available to the Additional Insured and shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy, whichever is greater.

CONTRACTOR shall maintain insurance as required by this contract to the fullest amount allowed by law and shall maintain insurance for a minimum of five years following completion of the project. In the event contractor fails to obtain

8.l
February 27, 2023

Packet Pg. 445

Agreement 2023 On-Call Sewer Replacement Project
Page A-7 Project No. C1702-23
or maintain completed operations coverage as required by this agreement, the city at its sole discretion may purchase the coverage required and the cost shall be paid by CONTRACTOR.

Primary and Non-Contributory Coverage
The Additional Insured coverage under the CONTRACTOR’s policy shall be “primary and non-contributory” as will not seek contribution from the CITY insurance or self-insurance and shall be at least as broad as CG 20 01 04 12.

Excess Insurance
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of CITY before the CITY insurance or self-insurance shall be called upon to protect it as a named insured.

14. SUBCONTRACTORS. CONTRACTOR agrees to include with all subcontractors in their subcontracts the same requirements and provisions of this agreement including the indemnity and Insurance requirements to the extent they apply to the scope of the Subcontractors’ work. Subcontractors hired by CONTRACTOR agree to be bound to CONTRACTOR and CITY in the same manner and to the same extent as CONTRACTOR is bound to CITY under the Contract documents.

Subcontract shall agree to include these same provisions in any agreement with a sub-subcontractor. CONTRACTOR shall require all subcontractors to provide a valid certificate of insurance and the required endorsements included in the agreement prior to commencement of any work and will provide proof of compliance to the CITY.

Subcontractor shall agree to be bound to CONTRACTOR and CITY in the same manner and to the same extent as CONTRACTOR is bound to CITY under the Contract Documents. Subcontractor shall further agree to include the same requirements and provisions of this agreement, including the indemnity and Insurance requirements, with a Sub-subcontractor to the extent they apply to the scope of the Sub-subcontractors’ work. A copy of the CITY Contract Document Indemnity and Insurance provisions shall be furnished to the subcontractor upon request.

15. WORKERS' COMPENSATION. CONTRACTOR certifies that he/she/it is aware of the provisions of the Labor Code of the State of California which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and CONTRACTOR certifies that he will comply with such provisions before commencing the performance of the work of this agreement.

16. NON-DISCRIMINATION. The CONTRACTOR hereby assures that it will comply with Subchapter VI of the Civil Rights Act of 1964, 42 USC Section 2000 (e)(17), to the end that CONTRACTOR will not exclude any person from participation in, be denied the benefits of, or be otherwise subject to discrimination from any project, program, or activity supported by this Agreement, based on the grounds

8.l
February 27, 2023

Packet Pg. 446

Agreement 2023 On-Call Sewer Replacement Project
Page A-8 Project No. C1702-23
of race, color, national origin, sex, disability, age, or religion,. CONTRACTOR shall comply with its EEO Certification (Form PW-7). In addition, CONTRACTOR will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The CONTRACTOR will take affirmative action to insure that applicants are employed and the employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include, but not be limited to the following:
employment, advancement, demotion, transfer, recruitment, or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The CONTRACTOR shall at all times be in compliance with the requirements of the Federal Americans With Disabilities Act (Public Law 101-336) which prohibits discrimination on the basis of disability by public entities. The CONTRACTOR agrees to post in conspicuous places available to employees and applicants for employment any notices provided by the CITY setting forth the provisions of this non-discrimination clause.

17. Notice. All notices required by this Agreement shall be given to the CITY and CONTRACTOR in writing, by first class mail, postage prepaid, addressed as follows:

CITY: City of San Carlos
600 Elm Street
San Carlos, CA 94070
Attention:

CONTRACTOR: _____________________
Address
Phone
Attention: ______________

18. Non-Assignment. This Agreement is not assignable either in whole or in part.

19. Amendments. This Agreement may be amended or modified only by written agreement signed by both parties.

20. Business Registration. CONTRACTOR agrees to comply with Chapter 5.04 of the Municipal Code and pay all fees required to be paid.

21. Validity. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

22. Governing Law. This Agreement shall be governed by the laws of the State of California and any suit or action initiated by either party shall be brought in the County of San Mateo, California. In the event of litigation between the parties hereto to enforce any provision of the Agreement, the unsuccessful party will pay the reasonable attorney’s fees and expenses of litigation of the successful party.

23. Mediation. Should any dispute arise out of this Agreement, the parties shall meet in mediation and attempt to reach a resolution with the assistance of a mutually acceptable mediator. Neither party shall be permitted to file legal action without

8.l
February 27, 2023

Packet Pg. 447

Agreement 2023 On-Call Sewer Replacement Project
Page A-9 Project No. C1702-23
first meeting in mediation and making a good faith attempt to reach a mediated resolution. The costs of the mediator, if any, shall be paid equally by the parties.

If a mediated settlement is reached neither party shall be deemed the prevailing party for purposes of the settlement and each party shall bear its own legal costs.

If a party refuses or fails to participate in mediation in good faith prior to filing a lawsuit, then that party shall be barred from recovery of attorneys fees and costs of suit.

24. Conflict of Interest. CONTRACTOR may serve other clients, but none who are active within the City of San Carlos or who conduct business that would place CONTRACTOR in a "conflict of interest" as that term is defined in State law.

25. Entire Agreement. Each party acknowledges that this agreement, the exhibits hereto, and the documents incorporated by reference herein constitute the complete agreement and exclusive statement of the terms and conditions between the parties, which supercedes and merges all prior proposals, understandings and all other agreements, verbal and written, between the parties relating to the subject matter of this agreement. This agreement may not be modified or altered except by written instrument duly executed by both parties.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date first above written by their respective officers duly authorized in that behalf.

CITY OF SAN CARLOS:

Dated: _______________ ______________________________
Jeff Maltbie, City Manager
ATTEST:

Dated: _______________ ______________________________
Crystal Mui, City Clerk
APPROVED AS TO FORM:

Dated: _______________ ______________________________
Gregory J. Rubens, City Attorney
CONSULTANT/CONTRACTOR/VENDOR:

8.l
February 27, 2023

Packet Pg. 448

Agreement 2023 On-Call Sewer Replacement Project
Page A-10 Project No. C1702-23
I acknowledge that I have full authority to execute this agreement on behalf of the Consultant/Contractor/Vendor, and have read, understand, and agree to comply with the provisions of this Agreement, including the Insurance and indemnity requirements set forth herein.

Dated: _______________ ______________________________

8.l
February 27, 2023

Packet Pg. 449

Agreement 2023 On-Call Sewer Replacement Project
Page A-11 Project No. C1702-23

EXHIBIT A
CONTRACTOR’S BID PROPOSAL

[To be attached]

8.l
February 27, 2023

Packet Pg. 450

Agreement 2023 On-Call Sewer Replacement Project
Page A-12 Project No. C1702-23

EXHIBIT B
This INSURANCE COVERAGE FORM modifies or documents insurance provided under the following:

Named Insured: Effective Work Date(s):

Description of Work/Locations/Vehicles:

ADDITIONAL INSURED: City of San Carlos
600 Elm Street, San Carlos, CA 94070
Attention: _________________________________
Contract Administrator
Endorsement and Certificates of Insurance Required
The Additional Insured, its elected or appointed officers, officials, employees and volunteers are included as insureds with regard to damages and defense of claims arising from: (Check all that apply) Insurer Policy No.

General Liability: (a) activities performed by or on behalf of the Named Insured, (b) products and completed operations of the Named Insured, (c) premises owned, leased occupied or used by the Named Insured, and/or (d) permits issued for operations performed by the Named Insured. {Note:

MEETS OR EXCEEDS ISO Form # CG 20 10 11 85}
Auto Liability : the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Named Insured, regardless of whether liability is attributable to the Named Insured or a combination of the Named Insured and the Additional Insured, its elected or appointed officers, officials, employees or volunteers.

Other:

Certificates of Insurance Required (no endorsement needed) (Check all that apply)
Insurer Policy No.

Workers Compensation: work performed by employees of the Named Insured while those employees are engaged in work under the simultaneous directions and control of the Named Insured and the Additional Insured.

Professional Liability:

PRIMARY/NON-CONTRIBUTORY: This insurance is primary and is not additional to or contributing with any other insurance carried by or for the benefit of Additional Insureds.

SEVERABILITY OF INTEREST: The insurance afforded by this policy applies separately to each insured who is seeking coverage or against whom a claim is made or a suit is brought, except with respect to the insurer’s limit of liability.

PROVISIONS REGARDING THE INSURED'S DUTIES AFTER ACCIDENT OR LOSS: Any failure to comply with reporting provisions of the policy shall not affect coverage provided to the Additional Insured, its elected or appointed officers, officials, employees, or volunteers.

CANCELLATION NOTICE. The insurance afforded by this policy shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days' prior written notice (ten (10) days if canceled due to non-payment) by regular mail return receipt requested has been given to the Additional Insured. Such notice shall be addressed as shown above.

WAIVER OF SUBROGATION: The insurer(s) named above agree to waive all rights of subrogation against the CITY/Public Works Departmentt, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of this policy which arise from work performed by the Named Insured for the CITY/Public Works Department.

Nothing herein contained shall vary, alter or extend any provision or condition of the Policy other than as above stated.

8.l
February 27, 2023

Packet Pg. 451

Agreement 2023 On-Call Sewer Replacement Project
Page A-13 Project No. C1702-23

SIGNATURE OF INSURER OR AUTHORIZED REPRESENTATIVE OF THE INSURER I, _______________________________________________________________(print/type name), warrant that I have authority to bind the above-named insurance company and by my signature hereon do so bind this company. ________________________________________________________________ _____________________ SIGNATURE OF AUTHORIZED REPRESENTATIVE (original signature required) DATE ISSUED ORGANIZATION:_________________________________________ TITLE:______________________________ ADDRESS: _____________________________________________ TELEPHONE: ( ) _______

RESOLUTION OF CONSTRUCTION CLAIMS
Any public works claims arising under this contract which the Contractor wishes to assert against the Governing Agency shall be governed by California Public Contract Code Section 9204. Claims which do not exceed three hundred seventy-five thousand dollars ($375,000) are also subject to the provisions of Article 1.5 of the California Public Contract Code (commencing with Section 20104). Pursuant to California Public Contracts Code Section 9204, claims shall be resolved as follows:
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

← All documents from this meeting