8” TO 12” RIP-RAP
The contract price paid per cubic yard for “ 8” t o 12” Rip Rap” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved including, furnishing and installation of backfill material and rip rap, complete in place, as specified herein, as shown on the Plans, as specified in the Specifications, and the Special Provisions, and as directed by the Engineer and no additional compensation will be allowed therefor.
3” DECOMPOSED GRANITE
The contract price paid per square foot for “Decomposed Granite” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved including, excavation, preparing, furnishing, and compacting the subgrade, aggregate base and decomposed granite, complete in place, as specified herein, as shown on the Plans, as specified in the Specifications, and the Special Provisions, and as directed by the Engineer and no additional compensation will be allowed therefor.
LANDSCAPE RESTORATION
The contract price paid per square foot for “ Landscape Restoration” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved including backfill with top soil, hydroseed, mulch, erosion control blanket, complete in place, as specified herein, as shown on the Plans, as specified
8.k
August 12, 2024
Packet Pg. 258
Bid Item Descriptions Highlands Park Path Project
BD-8 City Project No. C18
in the Specifications, and the Special Provisions, and as directed by the Engineer and no additional compensation will be allowed therefor.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 259
Bid Item Descriptions Highlands Park Path Project
BD-9 City Project No. C18
This Page Intentionally Left Blank
8.k
August 12, 2024
Packet Pg. 260
TECHNICAL SPECIFICATIONS
8.k
August 12, 2024
Packet Pg. 261
THIS PAGE INTENTIONALLY LEFT BLANK
8.k
August 12, 2024
Packet Pg. 262
TABLE OF CONTENTS
SECTION 011100 - SUMMARY OF WORK .........................................................................1 SECTION 013000 SPECIAL PROJECT CONSTRAINTS.................................................6 SECTION 013100 COORDINATION.................................................................................7 SECTION 013300 CONTRACTOR SUBMITTALS..........................................................10 SECTION 014516 QUALITY CONTROL.........................................................................18 SECTION 015050 MOBILIZATION .................................................................................24 SECTION 015100 TEMPORARY UTILITIES AND FACILITIES.....................................27 SECTION 015550 TEMPORARY TRAFFIC CONTROL SYSTEMS...............................29 SECTION 015600 PROTECTION OF EXISTING FACILITIES .......................................36 SECTION 020010 SITE CONDITIONS............................................................................42 SECTION 020020 STORM WATER POLLUTION CONTROL .......................................45 SECTION 020030 EXISTING UTILITIES AND UNDERGROUND STRUCTURES ........47 SECTION 021100 SITE PREPARATION........................................................................49 SECTION 024100 - DEMOLITION .....................................................................................51 SECTION 310513 CLEARING & GRUBBING, EXCAVATION, AND EARTHWORK....58 SECTION 321123 AGGREGATE BASE COURSES ......................................................67 SECTION 321216 ASPHALT PAVING AND MISCELLANEOUS PAVING ITEMS........71 SECTION 321313 CONCRETE IMPROVEMENTS.........................................................85 SECTION 331400 TIMBER SOLDIER PILE RETAINING WALL ...................................88 SECTION 332250 SHORING AND TRENCH SAFETY ..................................................94 SECTION 332315 EXCAVATION AND BACKFILL........................................................98 SECTION 332520 RIP RAP...........................................................................................108 SECTION 332538 PRECAST CONCRETE STORM DRAIN STRUCTURES...............110 SECTION 332655 STORM DRAIN PIPING...................................................................113 SECTION 333600 GROUT ............................................................................................120
8.k
August 12, 2024
Packet Pg. 263
Technical Specifications Highlands Park Path Project C1811 TP - 1
SECTION 011100 - SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
A. The Contract Documents describe the Work to be performed under this Contract which includes, but is not limited to, providing all plant, tools, equipment, materials, supplies, and manufactured articles for the Project. It shall also include the providing of all transportation and services, including fuel, power, water, and essential communications, necessary and for the performance of all labor, work, or other operations required for the performance of the Contract in accordance with the Contract Documents.
B. The Contractor shall sufficiently obligate himself/herself and take the necessary precautions so as to perform and complete the work in accordance with the requirements of the contract documents and specifications and/or as shown on the plans and within the time limit specified herein.
C. Related Sections
1. Section 013000 Special Project Constraints
2. Section 013300 Contractor Submittals
3. Section 015100 Temporary Utilities and Facilities
4. Section 015550 Temporary Traffic Control Systems
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. The work is described generally as the following work items:
1. Removing trees and stumps
2. Pruning trees,
3. Removing and replacing asphalt concrete
4. Widening asphalt concrete path
5. Removing and replacing curb and gutter
6. Installing new storm drain pipe and inlets
7. Installing timber soldier pile retaining walls
B. All risk of loss, damage or diminution to the Work shall rest with Contractor until final acceptance of the Work by the City.
1.3 JOB CONDITIONS
A. The Project corridor includes gas mains, high voltage underground power lines, and other potentially hazardous facilities. Contractor shall make himself fully aware of all potential hazards and utilize experienced and qualified personnel when working adjacent to such facilities. Contractor shall be responsible to coordinate with the utility owners as required for compliance when working adjacent to such facilities.
B. Contractor shall be responsible for making himself familiar with the site conditions.
8.k
August 12, 2024
Packet Pg. 264
Technical Specifications Highlands Park Path Project C1811 TP - 2
1.4 BEGINNING AND COMPLETION OF THE WORK
A. In accordance with the provisions of the Contract Documents, the Contractor shall begin the Work on the date specified in the written Notice to Proceed from the City, and shall complete all of the Work included in the Contract within the time specified in said Notice. Time stated for completion shall include final cleanup of the premises.
1.5 CONTRACT METHOD
A. The Work of this Contract is a combination unit price and lump sum contract. The basis for measurement and payment shall be as indicated in the General Provisions and these Specifications.
B. The Contractor shall include the requirements of the General Provisions, Special Provisions, and Engineers Supplementary Conditions, as a part of all of its subcontract agreements.
1.6 ORDER OF THE WORK
A. Contractors order and time to complete shall conform to the requirements of the approved Contractor's schedule as submitted under the provisions for "Contractor's Schedules" in Section 013300, Contractor Submittals. B. Order of work shall include, but not be limited to, consideration of constraints as described in Section 013000, Special Project Constraints.
1.7 WORK BY OTHERS
A. Multiple projects (City, other agency, and private) are planned in or adjacent to the City right of way during the time of the contract in the immediate vicinity. The Contractor is responsible for full cooperation with adjacent project operations, coordination of work and work area, and provision of requisite temporary traffic control measures as required within these special provisions.
B. Interference With Work on Utilities: The Contractor shall cooperate fully with all utility forces of the City or forces of other public or private agencies engaged in the relocation, altering, installation or otherwise rearranging of any facilities which interfere with the progress of the Work, and shall schedule the Work so as to minimize interference with said relocation, altering, or other rearranging of facilities.
C. Contractor shall cooperate fully with all other City contractors or forces of other public or private entities engaged in the installation, relocation, altering, or otherwise rearranging of any facilities which interfere with the progress of the Work, and shall schedule the Work so as to minimize interference with said installation, relocation, altering, or other rearranging of facilities.
8.k
August 12, 2024
Packet Pg. 265
Technical Specifications Highlands Park Path Project C1811 TP - 3
1.8 WORK SEQUENCE/NOTIFICATIONS
A. No sustained interruption in access to any adjacent businesses, institutions, or residences along the alignment can be accommodated. Interruption of access to any adjacent businesses or residences shall not exceed 30 minutes without approval from the City and shall not continue beyond project work hours as specified in Section 013000, Special Project Constraints. Prior to beginning work in the vicinity of any businesses, institutions, or residences, the Contractor shall contact the businesses, institution, or residences, provide the business, institution, or home owner a written preliminary notification of the intended schedule, and if necessary, determine and prepare an alternate schedule for the Engineers approval that provides minimal disruption. Additional notification requirements are specified in Section 015550, Temporary Traffic Control Systems.
1.9 CONTRACTOR USE OF PROJECT SITE
A. The Contractor's use of the project site shall be limited to its construction operations, including on-site storage of materials, and on-site fabrication facilities.
B. The Contractor shall remove all equipment and materials from the City of San Carlos rights-of-way outside of normal work hours.
1. The Contractor shall identify potential staging site(s) for the Contractors use for construction staging and storage of equipment/materials directly related to this Project. The Contractor shall make all arrangements with property owner, City, and/or any other party(ies) of interest for staging areas. the Contractor shall provide a signed letter from t he property owner authorizing the use of the property as a staging area.
1.10 CITY USE OF THE PROJECT SITE
A. The City and the Engineer and their authorized representatives shall be allowed access to the project site at all times during the period of construction.
B. Private utility companies and other entities performing construction on the site shall have access to the project site.
C. Any land-locked parcels adjacent to the project site shall be provided access/egress by the Contractor.
1.11 PARTIAL UTILIZATION OF THE WORK BY CITY
A. The City may allow partial utilization of the Work upon completion of the various stages. Utilization of the work does not indicate acceptance of any portion of the work.
8.k
August 12, 2024
Packet Pg. 266
Technical Specifications Highlands Park Path Project C1811 TP - 4
1.12 PROJECT MEETINGS
A. Preconstruction Meeting: Prior to the commencement of Work at the site, a Preconstruction meeting will be held at a mutually agreed time and place which shall be attended by the Contractor, its Superintendent, and its subcontractors as appropriate. Other attendees may include:
1. Engineer and the Construction Inspector.
2. Representatives of City.
3. Representatives of Permittees as appropriate.
4. Others as requested by Contractor, or Engineer.
B. Unless previously submitted to the Engineer, the Contractor shall bring to the meeting six copies of each of the following:
1. Draft Construction Schedule.
2. Procurement schedule of major equipment and materials and items requiring long lead time.
3. Preliminary Schedule of Shop Drawings, Samples, and Product Data Submittals.
4. Schedule of Values (unit price and lump sum price breakdown) for progress payment purposes.
5. Substitution Requests per Section 013300.
6. Letter of Responsibility designating emergency contacts for the Contractor after business hours (3 copies).
C. The purpose of the meeting is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed and procedures for handling such matters established. The agenda may include the following:
1. Contractor's tentative schedules.
2. Update on public outreach.
3. Transmittal, review, and distribution of Contractor's submittals.
4. Processing applications for payment.
5. Maintaining of record documents.
6. Critical work sequencing.
7. Field decisions and Change Orders.
8. Use of project site, office and storage areas, security, housekeeping, and City's needs.
9. Major equipment deliveries and priorities.
10. Contractor's assignments for safety and first aid.
11. Contact information for Contractor, Superintendent.
D. The Engineer will preside at the Preconstruction meeting and will arrange for keeping the minutes and distributing the minutes to all persons in attendance.
1.13 PRECONSTRUCTION PHOTOGRAPHS
A. Prior to commencement of any construction activity, the City Inspector will take
8.k
August 12, 2024
Packet Pg. 267
Technical Specifications Highlands Park Path Project C1811 TP - 5
photographs and/or video of all work areas.
B. The Contractor shall conduct a photographic and/or video survey prior to commencement of any construction activity. The purpose for preconstruction documentation is to establish baseline conditions for evaluation of any change in existing conditions in the vicinity of the work zone during construction (i.e. damage to existing hardscape, structures, etc.).
1.14 WEEKLY PROGRESS MEETINGS
A. Weekly progress meetings will be scheduled and held at the City office, or another mutually agreed location near the site.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 268
Technical Specifications Highlands Park Path Project C1811 TP - 6
SECTION 013000 SPECIAL PROJECT CONSTRAINTS
PART 1 - GENERAL
1.1 SCHEDULING
A. Pedestrian access shall be maintained throughout the project site for the duration of the construction. Vehicle access to the adjacent businesses, institutions, and residences shall also be maintained for the duration of the closure.
B. The Contractor shall locate and make himself familiar with existing underground utilities. The proposed roadway and improvements may be within close proximity to existing facilities. The Contractor shall maintain a minimum cover of 18-inches from subgrade to all existing utilities. Any locations that do not meet this requirement shall immediately be brought to the attention of the Engineer.
Adherence with this clause and protection of existing facilities shall be the responsibility of the Contractor.
C. The Contractor shall submit a construction staging area plan for City approval for all staging areas proposed for use with the project.
D. The construction constraints described herein shall be incorporated into the Contractor's schedule.
E. The Contractor shall be responsible for the allocation of space for temporary field offices and structures (if necessary) furnished by itself or its subcontractors; monitoring the use of temporary utilities; verification that adequate services are available to comply with requirements for Work and climatic conditions; and the administration of traffic and parking controls. All such work shall be in strict conformance with the applicable requirements specified in Sections 015100, Temporary Utilities, and elsewhere in this Division 1.
F. Night work will not be permitted, with the exception of temporary traffic control measures necessary to perform the Work.
PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 269
Technical Specifications Highlands Park Path Project C1811 TP - 7
SECTION 013100 COORDINATION
PART 1 GENERAL
1.1 SUMMARY
A. The Contractor shall be responsible for the coordination of all work and the coordination of the work of all subcontractors. The Contractor shall not delegate coordination to any subcontractor. Coordination, as referred to herein, shall include the establishment of on-site lines of authority and communication and assistance in scheduling of and attendance of progress meetings between the Engineer or the City and the Contractor and its subcontractors. The Contractor's onsite supervisory person shall be present and represent the General Contractor whenever a meeting is held that involves any interface between the City or Engineer and any subcontractors or suppliers.
B. Related Sections
1. Section 011000 Summary of Work
2. Section 013000 Special Project Constraints
3. Section 013300 Contractor Submittals
4. Section 015100 Temporary Utilities and Facilities
5. Section 015550 Temporary Traffic Control Systems
6. Section 015600 Protection of Existing Facilities
1.2 CONSTRUCTION PROGRESS SCHEDULES
A. Submit initial progress schedule for review by Engineer in duplicate within ten (10) working days after date of Contract. After review, submit detailed schedules within ten (10) working days, modified to accommodate revisions recommended by the Engineer and/or the City.
B. Submit revised schedules with each application for payment, identifying changes since previous version. Indicate estimated percentage of completion for each item of work at each submission.
C. Submit a comprehensive 3-week look ahead schedule for discussion with City at each weekly construction progress meeting.
D. Distribute copies of reviewed schedules to project site file, subcontractors, suppliers and other concerned parties.
E. Instruct recipients to promptly report, in writing, problems anticipated by projections indicated in schedules.
F. Submit computer generated horizontal bar chart with separate line for each major portion of work or operation, identifying first workday of each week.
8.k
August 12, 2024
Packet Pg. 270
Technical Specifications Highlands Park Path Project C1811 TP - 8
G. Submit revised Schedule of Values within ten (10) working days after preconstruction meeting, modified to accommodate revisions recommended by the Engineer and/or the City.
1.3 GENERAL COORDINATION
A. All Work covered in the Contract Documents shall be coordinated as a part of the Contractor's obligations under the Contract. The Contractor shall coordinate his/her operations with the City and others working in the immediate area.
B. The Contractor shall assure timely fabrication of work, erection of work, and completion of closeout items and the timely preparation of shop drawings and other submittals in conformance with the approved construction schedule.
C. The Contractor shall coordinate the efforts of all individuals and subcontractors in the execution of the Work, including work by others as specified in Section 01110, "Summary of Work."
D. The Contractor shall resolve differences or disputes between subcontractors concerning coordination, interferences, or extent of work between Sections. The Contractor's decisions, if consistent with the Contract Document requirements, shall be final.
E. The Contractor shall conduct his/her operations so that existing utilities are kept in continuous operation throughout the execution of this contract. The Contractor, therefore, shall schedule and conduct their work so as to minimize interference with the operation and maintenance of these facilities. Methods, schedules and sequences of construction which prevent or jeopardize the Citys compliance with Clean Water Standards or the NPDES Permit are not acceptable.
F. When modification, addition or connection to existing pipelines, structures, systems, circuits or equipment is required, the Contractor shall schedule such activities with the Engineer. The Contractor shall notify the Engineer, in writing, one (1) week in advance of the time when construction operations will require connection to, or modification of, in-service portions of the existing facility. No pipeline system, structure, circuit or individual unit shall be cut, modified, dewatered or removed from the facility unless authorized by the Engineer.
G. In the event that the Contractor accidentally damages operating pipes or utilities, they shall immediately affect the necessary repairs. The Contractor shall maintain an inventory of repair clamps and materials for small pipelines, including temporary pumps, bypass pipelines, electrical conductors or other facilities necessary to maintain operation of sewerage facilities while the repairs are being made. The Contractor shall provide telephone numbers of standby personnel who will respond during non-working hours to repair facilities which interrupt normal operations.
H. If the Contractor fails to respond to a request by the Engineer, the City reserves
8.k
August 12, 2024
Packet Pg. 271
Technical Specifications Highlands Park Path Project C1811 TP - 9
the right to affect the repair with its own forces or by another contractor. The cost for repairs performed by others will be deducted from the payment due the Contractor.
I. In addition to notifying the Engineer (Section 1.03 F), Contractor shall notify affected property owners and residents in writing minimum of 48-hours in advance prior to any planned temporary shutdown of utility services.
J. In City and Contractor shall utilize a web-based document management system for submission of all data and documents, including public outreach documents where applicable throughout the duration of the Contract.
1.4 SPECIAL COORDINATION
A. The Contractor shall provide advance notification to the Engineer of specific tasks, tests and inspections specified. Failure to provide such advance notification may be cause for rejection of the Work.
1.5 COORDINATION OF SUBCONTRACTOR RESPONSIBILITIES
A. The Contractor shall be responsible for coordination of the work of each of its subcontractors and suppliers. Special attention is directed to the following obligations of the Contractor:
1. Verify that subcontractors have obtained permits for inspections.
2. Review all subcontractor shop drawings, product data, and sample submittals for compliance with Contract Documents prior to submittal to Engineer for general review for compliance with design intent.
3. Maintain onsite documentation and keep current record drawing set at Project site.
4. Verify that specified cleaning is done during progress of Work and at completion of each subcontract.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 272
Technical Specifications Highlands Park Path Project C1811 TP - 10
SECTION 013300 CONTRACTOR SUBMITTALS
PART 1 GENERAL
1.1 SUMMARY
A. This section describes general requirements for submittals for the Work.
B. Related Sections
1. Section 011100 Summary of Work
2. Section 013100 Coordination
3. Section 015550 Temporary Traffic Control Systems
4. Section 321216 Paving Systems
5. Section 321723 Traffic Striping, Pavement Markers, Pavement Markings & Signage
1.2 PROCEDURES
A. Submit at Contractors expense, Schedule of Shop Drawing and Sample Submittals, Safety Plans, Progress Schedules, Product Data, Shop Drawings, Samples, Substitution Requests, Traffic Control Plans, Construction Staging Area Plan, Storm Water Pollution Prevention Plan (SWPPP), and Project Record Documents, and all other submittals required by the Contract Documents. Submit these submittals to Engineer for review and approval.
B. Use a submittal transmittal form, in duplicate, containing:
1. Date, and revision date and submittal log number.
2. Project title.
3. Contractors name and address and job number.
4. Specification Section clearly identified.
5. The quantity of each Shop Drawing, Product Data, and Samples submitted.
6. Notification of deviations from Contract Documents.
7. Materials safety data sheet (MSDS) for each item complying with OSHAs Hazard Communication Standard 29 CFR 1910.1200.
8. Other pertinent data.
C. Where manufacturers standard drawings or data sheets are used, they shall be marked clearly to show those portions of the data that are applicable to this project.
Submittals shall be submitted based on each technical specification section.
Submittals containing information about more than one specification section will be returned for resubmittal. Submittals shall include all information requested by each specification section. (No partial submittals.) Incomplete submittals will be returned not reviewed by Engineer. Provide a log number and reference to Specifications Section and/or Plan sheets and details, for each submittal for ease of identification of submittal. Submittal shall include:
1. Date and revision dates.
2. Revisions, if any, identified.
8.k
August 12, 2024
Packet Pg. 273
Technical Specifications Highlands Park Path Project C1811 TP - 11
3. Project Title and number.
4. The names of: Engineer, Contractor, Subcontractor, Supplier, Manufacturer, and separate detailer, when pertinent.
5. Identification of product material by location within the Project.
6. Relation to adjacent structure or materials.
7. Field dimensions, clearly identified as such.
8. Specification Section number and applicable detail reference numbers on the drawings.
9. Applicable standards, such as ASTM, ANSI, FS, NEMA, SMACNA or ACI.
10. A blank space, on each Drawing or data sheet, 5 x 4 for the Engineers stamp.
11. Identification of deviations from Contract Documents.
12. Contractors stamp, initialed or signed, with language certifying the review of submittals, verification of field measurements, construction criteria and technical standards in compliance with Contract Documents.
D. The data shown on the Shop Drawings shall be complete with respect to quantities, dimensions, specified performance and design criteria, materials and similar data to show Engineer the materials and equipment Contractor proposes to provide and to enable Engineer to review the information for the limited purposes specified below. Samples shall be identified clearly as to material, supplier, pertinent data such as catalog numbers and the use for which it is intended and otherwise as Engineer may require to enable Engineer to review the submittal. The number of each Sample to be submitted will be as specified in the Specifications.
E. Substitutions:
1. Substitution for those equipment, procedures, materials and/or products specified shall only be permitted when the proposed unnamed equal product or material to be furnished is both equal in quality and utility and after the Contractor has complied with the following provisions:
a. All substitutions shall be reviewed by the City;
b. The City must approve such substitution in writing prior to its incorporation into the work;
c. Unless otherwise authorized in writing by the City, the Contractor shall, prior to award and placing any purchase orders, and at least thirty (30) calendar days before it requires approval of any such alternative item, submit to the City sufficient data, drawings, samples, literature or other detailed information as will demonstrate to the City that the proposed substitute is equal in quality and utility to the equipment, materials, procedures and/or products specified.
2. Within thirty (30) calendar days following receipt of all requested information from the Contractor, the City will determine whether the proposed alternative is equal in quality and utility and meets the requirements of the Contract and will inform the Contractor in writing of such determination. The burden of substantiating the quality and utility of alternatives shall be upon the Contractor, and the Contractor shall furnish all necessary information requested and required by the City. The City will be the sole judge as to the quality and utility of alternative equipment, materials and/or products, and
8.k
August 12, 2024
Packet Pg. 274
Technical Specifications Highlands Park Path Project C1811 TP - 12
the Citys decision shall be final. An acceptance by the City of a substitution shall not relieve the Contractor from complying with the requirements of the Project Drawings and Specifications. Acceptance by the City shall not relieve the Contractor from full responsibility for the efficiency, sufficiency and quality and performance of the substitute equipment, materials, procedures and/or products, in the same manner and degree as the equipment, materials, procedures and/or products specified by name.
3. Failure of the Contractor to submit proposed substitutions for review in the manner described above and within the time prescribed shall be sufficient cause for rejection by the City of any other proposed substitutions.
4. In determining whether a proposed product is equal in quality and utility, the City is not restricted to such basic issues as performance and durability, but may consider any other issues that the City, in the discretion of the City, deems appropriate. Said issues may, but are not required to include, nor are they limited to, such additional factors as comparable performance, reliability, efficiency or operation, ease of operation, adaptability, ease of maintenance, capital costs, life-cycle costs, operational characteristics, costs of training personnel, maintenance history, warranties, problems created by the resulting overall warranty system, availability of qualified service, availability of parts, the history of any supplier, and compatibility with existing facilities.
5. No one factor or group of factors, including such issues as savings on capital costs, shall be determinative of whether the proposed product or material is equal in quality and utility. The decision of the City shall be based on those factors deemed by the City to be relevant and any data, drawings, samples, literature or other detailed information furnished by the Contractor with respect to the proposed substitution.
6. Each decision as to whether a product or material is equal in quality and utility shall be made by the City on a case-by-case basis.
7. The Contractor shall be responsible for any and all costs, including consultant costs, incurred by the City with respect to the proposed substitution that exceed the costs inherent in the normal and reasonable review of drawings and other standard data, information and documents concerning any proposed substitution. The Contractor shall be responsible for this cost, regardless of whether or not the substitution is approved by the City.
F. Submittal coordination and verification is the responsibility of Contractor; this responsibility shall not be delegated in whole or in part to subcontractors or suppliers. Before submitting each Shop Drawing or Sample, Contractor shall have reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents, and shall have determined and verified:
1. All field measurements, quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar information with respect thereto;
2. All materials with respect to intended use, fabrication, shipping, handling, storage, assembly and installation pertaining to the performance of the
8.k
August 12, 2024
Packet Pg. 275
Technical Specifications Highlands Park Path Project C1811 TP - 13
Work; and
3. All information relative to Contractors sole responsibilities and of means, methods, techniques, sequences and procedures of construction and safety precautions and programs incident thereto.
G. Contractors submission to City or to Engineer of a Shop Drawing or Sample submittal will constitute Contractors representation that it has satisfied its obligations under the Contract Documents, and as set forth immediately above, with respect to Contractors review and approval of that submittal.
H. Designation of work by others, if shown in submittals, shall mean that work will be responsibility of Contractor rather than subcontractor or supplier who has prepared submittals.
I. The Contractor shall sign a statement with each submittal, certifying that the submittal has been checked by the Contractor and is in conformance with the Specifications. Any submittal received without this certification shall be returned AMEND AND RESUBMIT and count as one submittal under R.5.a of this specification section.
J. After review by City or Engineer of each of Contractors submittals, two (2) sets of material will be returned to Contractor with actions defined as follows:
1. NO EXCEPTIONS TAKEN A formal revision and resubmission of said submittal will not be required. Accepted subject to its compatibility with future submittals and additional partial submittals for portions of the work not covered in this submittal does not constitute approval or deletion of specified or required items not shown on the submittal.
2. MAKE CORRECTIONS NOTED (NO RESUBMISSIONS REQUIRED) Same as 1 above, except that minor corrections as noted shall be made by Contractor.
3. AMEND AND RESUBMIT - Rejected because of major inconsistencies or errors that shall be resolved or corrected by Contractor prior to subsequent review by Engineer.
4. REJECTED - The submittal is illegible or the submittal is so far out of compliance with the contract documents that the Contractor needs to try again, from scratch.
K. Contractor shall make a complete and acceptable submittal at least by second submission. City reserves the right to deduct monies from payments due Contractor to cover additional costs of review beyond the second submission.
Illegible submittals will be rejected and returned to Contractor for resubmission.
Contractor shall be in breach of the Contract if it, following a submittal which City determines falls within category 3 above, Contractors first resubmittal does not fall within categories 1 or 2 above.
L. Favorable review will not constitute acceptance by City or Engineer of any responsibility for the accuracy, coordination and completeness of the submittals.
Accuracy, coordination, and completeness of Submittals shall be the sole
8.k
August 12, 2024
Packet Pg. 276
Technical Specifications Highlands Park Path Project C1811 TP - 14
responsibility of Contractor, including responsibility to back-check comments, corrections, and modifications from City or Engineers review before fabrication.
Contractor, subcontractors, or suppliers may prepare submittals, but Contractor shall ascertain that submittals meet requirements of Contract Documents, while conforming to structural space and access conditions at point of installation.
Engineers review will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as indicated by the Contract Documents. Favorable review of submittal, method of work, or information regarding materials and equipment Contractor proposes to furnish shall not relieve Contractor of responsibility for errors therein and shall not be regarded as assumption of risks or liability by City or Engineer, or any officer or employee thereof, and Contractor shall have no claim under Contract on account of failure or partial failure or inefficiency or insufficiency of any plan or method of work or material and equipment so accepted. Favorable review shall be considered to mean merely that City and/or Engineer has no objection to Contractor using, upon his own full responsibility, plan or method of work proposed, or furnishing materials and equipment proposed.
M. City and/or Engineers review will not extend the means, methods, techniques, sequences or procedures of construction or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions.
N. Submit complete initial submittal for those items where required by individual specification Sections. Complete submittal shall contain sufficient data to demonstrate that items comply with Specifications, shall meet minimum requirements for submissions cited in technical specifications, shall include certifications, where required, and shall include necessary revisions required for equipment other than first named. If Contractor submits incomplete initial submittal, when complete submittal is required, submittal may be returned to Contractor without review.
O. It shall be Contractors responsibility to copy, conform and distribute reviewed submittals in sufficient numbers for Contractors files, subcontractors and vendors.
P. After City and/or Engineers review of submittal, revise as noted and resubmit as required.
Identify changes made since previous submittal.
1. Begin no fabrication or work that requires submittals until return of submittals not requiring resubmittal.
2. Normally, submittals will be processed and returned to Contractor within ten (10) working days of receipt.
Q. Distribute copies of reviewed submittals to concerned persons. Instruct recipients to promptly report any inability to comply with provisions.
R. All shop drawings and submittals shall be number identified by Contractor, prior to
8.k
August 12, 2024
Packet Pg. 277
Technical Specifications Highlands Park Path Project C1811 TP - 15
submission to Engineer, in accordance with the following:
1. Contractor shall sequentially number each submittal (i.e., 1, 2, 3, etc.) as the basis for number identification of all shop drawings and submittals.
2. Affix the submittal number under which each submittal is made on every copy of each shop drawing, product data, sample, certification, O & M manual, etc.
3. If the submittal is a resubmittal (including without limitation after an initial submittal is rejected, returned not reviewed or marked revise as noted and resubmit), add the suffix designation A (i.e., a resubmittal of submittal 1 would be numbered 1A). Subsequent resubmittals would be identified by the submittal number and sequential letters (i.e., B, C, D, etc.).
4. All submittals shall include all information requested by each specification section. No partial submittals will be accepted unless previously authorized by Engineer. In the event a partial submittal is authorized, each subsequent different submittal (as opposed to resubmittal) is given a new number.
5. Number of resubmissions:
a. One reexamination of Contractors submittals that have been returned for correction or replacement will be included in Engineers scope. Any additional reexamination of Contractors submittals will be considered additional scope services to be paid by Contractor through City. Engineer shall be paid hourly at 3.0 times direct payroll expenses and charge consultants time at 1.25 times the amount billed Engineer.
1.3 SCHEDULE OF SHOP DRAWING AND SAMPLE SUBMITTALS
A. Submit preliminary Schedule of Shop Drawing, Samples, and Product Data Submittals as required, no later than five (5) working days following receipt of Notice to Proceed from City.
B. Schedule of Shop Drawing, Samples, and Product Data Submittals will be used by City and Engineer to schedule their activities relating to review of submittals.
Schedule of submittals shall indicate a spreading out of submittals and early submittals of long lead-time items and of items that require extensive review.
C. Schedule of Shop Drawing, Samples, and Product Data Submittals shall be reviewed by City and shall be revised and resubmitted until accepted by City.
D. Unless otherwise specified, make submittals in groups containing all associated items to assure that information is available for checking each item when it is received. Identify on the submittal which submittals should be reviewed together.
E. The Contractor agrees that shop drawing submittals processed by the City are not Change Orders; that the purpose of shop drawing submittals by the Contractor is to demonstrate to the City that they understand the design concept, that the Contractor demonstrates their understanding by indicating which equipment, procedure and material they intend to furnish and install and by detailing the proposed fabrication and installation methods. The Contractor further agrees that if
8.k
August 12, 2024
Packet Pg. 278
Technical Specifications Highlands Park Path Project C1811 TP - 16
deviations, discrepancies or conflicts between shop drawing submittals and the Contract Documents in the form of design drawings and specifications are discovered either prior to or after shop drawing submittals are processed by the City, the design drawings and specifications shall control and shall be followed.
1.4 DELAY OF SUBMITTALS
A. Delay of submittals by Contractor is considered avoidable delay. Liquidated damages incurred because of late submittals will be assessed to Contractor.
B. The City may periodically inspect the record drawings at the site. The proper and current maintenance of the information required on these drawings shall be a condition precedent to approval of requisitions for periodic payment.
1.5 RECORD DRAWINGS
A. General: The Contractor shall keep and maintain, at the job site, one record set of Contract Drawings. On these, it shall mark all project conditions, locations, configurations, and any other changes or deviations which may vary from the details represented on the original Contract Drawings, including buried or concealed construction and utility features which are revealed during the course of construction.
B. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Contract Drawings. Said record drawings shall be supplemented by any detailed sketches as necessary or directed to indicate, fully, the Work as actually constructed.
C. These master record drawings of the Contractors representation of as-built conditions, including all revisions made necessary by addenda, change orders, and the like shall be maintained up-to-date during the progress of the Work.
D. In the case of those drawings which depict the detail requirement for equipment to be assembled in the factory, the record drawings shall be updated by indicating those portions which are superseded by change order drawings or final shop drawings, and by including appropriate reference information describing the change orders by number and the shop drawings by manufacturer, drawing, and revision numbers.
E. Record drawings prepared by the Contractor shall be accessible to the Engineer at all times during the construction period and shall be delivered to the Engineer upon completion of the work.
F. Effect on Progress Payments: Requests for partial payments will not be approved if the record drawings are not kept current. All such Record Drawings will be inspected by the City each month, showing all variations between the Work as actually
8.k
August 12, 2024
Packet Pg. 279
Technical Specifications Highlands Park Path Project C1811 TP - 17
constructed and as originally shown on the Contract Drawings or other Contract Documents, and the City will not process monthly payment requests until such drawings are made current each month.
G. Final Record Drawings: Upon substantial completion of the Work and prior to final acceptance by the City, the Contractor shall complete and deliver one bond copy set and an electronic scanned set in PFD format with legible red-line changes dated and signed by the Contractor to the City for approval. The redline changes shall conform to the construction records of the Contractor. This information will be assumed to be reliable, and the Engineering will not be responsible for the accuracy of such information, nor for any errors or omissions which may appear on the Record Drawings as a result.
H. Effect on Final Payment: Final payment will not be approved until the Contractor- prepared bond copy set and an electronic scanned set in PFD format of the Record Drawings have been delivered to the City.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 280
Technical Specifications Highlands Park Path Project C1811 TP - 18
SECTION 014516 QUALITY CONTROL
PART 1 GENERAL
1.1 SITE INVESTIGATION AND CONTROL
A. The Contractor shall verify all dimensions in the field and shall check all field conditions continuously during construction. The Contractor shall be solely responsible for any inaccuracies built into the Work.
B. The Contractor shall inspect related and appurtenant work and shall report in writing to the Engineer, any conditions which will prevent proper completion of the Work. Any required removal, repair, or replacement caused by the Contractor shall be done by the Contractors work at its sole cost and expense.
1.2 INSPECTION OF THE WORK
A. General: The Work shall be conducted under the general observation of the Engineer and shall be subject to inspection by representatives of the City to verify strict compliance with the requirements of the Contract Documents.
B. The authorized representative of the Engineer on the project site shall be the Project Engineer acting directly and through various inspectors at the site. The presence of the Inspectors, however, shall not relieve the Contractor of the responsibility for the proper execution of the Work in accordance with all requirements of the Contract Documents. Compliance is distinctly a duty of the Contractor, and said duty shall not be avoided by any act or omission on the part of the inspector(s).
C. All materials and articles furnished by the Contractor shall be subject to rigid inspection, and no material or articles shall be used in the Work until it has been inspected and accepted by the Engineer or the City.
D. Inspection at Place of Manufacture: Unless otherwise specified, all products, materials, and equipment shall be subject to inspection by the Engineer at the place of manufacture if deemed necessary by the Engineer.
E. The presence of the Engineer at the place of manufacture however, shall not relieve the Contractor of the responsibility for furnishing products, materials, procedures and equipment which comply with all requirements of the Contract Documents.
1.3 SAMPLING AND TESTING
A. Unless otherwise specified, all sampling and testing shall be in accordance with the methods prescribed in the current standards of the ASTM or other specified published standards, as applicable to the class and nature of the article or
8.k
August 12, 2024
Packet Pg. 281
Technical Specifications Highlands Park Path Project C1811 TP - 19
materials considered; however, the City reserves the right to use any generally- accepted system of sampling and testing which, in the opinion of the Engineer will indicate to the City that the quality of the workmanship is in full accord with the Contract Documents.
B. Any waiver by the City of any specific testing or other quality assurance measures, whether or not such waiver is accompanied by a guarantee of substantial performance as a relief from the specified testing or other quality assurance requirements as originally specified, and whether or not such guarantee is accompanied by a "performance bond" to assure execution of any necessary corrective or remedial Work, shall not be construed as a waiver of any prescriptive or performance requirements of the Contract Documents. "Performance Bond" as used herein is a separate bond in addition to the Contract Performance Bond required in the General Conditions.
C. Notwithstanding the existence of such waiver, and in addition to any testing and inspection performed by any other inspector on behalf of the City or any other public agency having jurisdiction, the Engineer shall have the right to make independent investigations and tests, and failure of any portion of the Work to meet any of the requirements of the Contract Documents, shall be reasonable cause for the Engineer to require the removal or correction and reconstruction of any such work in accordance with the General Conditions.
1.4 TESTING AND INSPECTION SERVICES
A. Employ and pay for services of an independent testing agency or laboratory acceptable to City to perform specified testing.
1. Prior to start of Work, submit testing laboratory name, address, and telephone number, and names of full-time specialist and responsible officer.
2. Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of National Bureau of Standards during most recent inspection, with memorandum of remedies of deficiencies reported by inspection.
B. The independent firm will perform tests, inspections and other services specified in individual specification sections and as required by the Engineer.
1. Laboratory: Authorized to operate in the State of California.
2. Laboratory Staff: Maintain full time specialist on staff to review services.
3. Testing Equipment: Calibrated at reasonable intervals with devices of accuracy traceable to National Bureau of Standards or accepted values of natural physical constants.
C. Testing, inspections and source quality control may occur on or off project site.
Perform off-site testing as required by the Engineer or City.
D. Reports will be submitted by an independent firm to the Engineer and Contractor, indicating observations and results of tests and indicating compliance or non-
8.k
August 12, 2024
Packet Pg. 282
Technical Specifications Highlands Park Path Project C1811 TP - 20
compliance with Contract Documents.
E. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested.
1. Notify Engineer and independent firm 24 hours prior to expected time for operations requiring services.
2. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use.
F. Testing and employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
G. Re-testing or re-inspection required because of non-conformance to specified requirements shall be performed by same independent firm on instructions by the Engineer. Payment for re-testing or re-inspection is the sole responsibility of the Contractor.
H. Agency Responsibilities:
1. Test samples of mixes submitted by Contractor.
2. Provide qualified personnel at site. Cooperate with Engineer and Contractor in performance of services.
3. Perform specified sampling and testing of products in accordance with specified standards.
4. Ascertain compliance of materials and mixes with requirements of Contract Documents.
5. Promptly notify the Engineer and Contractor of observed irregularities or non- conformance of Work or products.
6. Perform additional tests required by the City or Engineer.
7. Attend preconstruction meetings and progress meetings on request.
I. Agency Reports: After each test, promptly submit one copy of the report to the Engineer and to the Contractor. When requested by the Engineer, provide interpretation of test results. Include the following:
1. Date issued.
2. Project title and number.
3. Name of inspector.
4. Date and time of sampling or inspection.
5. Identification of product and specifications section.
6. Location in Project.
7. Type of inspection or test.
8. Date of test.
9. Results of tests.
10. Conformance with Contract Documents.
J. Limits On Testing Authority:
8.k
August 12, 2024
Packet Pg. 283
Technical Specifications Highlands Park Path Project C1811 TP - 21
1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents.
2. Agency or laboratory may not approve or accept any portion of the Work.
3. Agency or laboratory may not assume duties of Contractor.
4. Agency or laboratory has no authority to stop the Work.
1.5 TESTING
A. All materials, equipment and work included in this contract shall be tested and inspected to prove compliance with the contract requirements. Unless otherwise specified, all costs of testing, including temporary facilities and connections, shall be borne by the Contractor. No tests specified herein shall be applied until the item to be tested has been inspected and approval given for the application of such test.
Tests and inspections shall include:
1. Factory tests.
2. The delivery acceptance test and inspections.
3. The installed tests and inspections of items as installed.
4. Tests and inspections, unless otherwise specified or accepted, shall be in accordance with the recognized standards of the industry.
The form of evidence of satisfactory fulfillment of delivery acceptance test and of installed test and inspection requirements shall be, at the discretion of the City, either by tests and inspections carried out in the Citys presence or by certificates or reports of tests and inspections carried out by approved persons or organizations. The Contractor shall provide and use forms which include all test information, including specified operational parameters, and shall be acceptable in content to the City.
B. Factory Observations and Tests. At the request of the City, the Contractor shall arrange with the factory for the City or his/her representatives to observe the manufacturing process and to witness performance tests at the factory or point of manufacture of any and all items to be furnished as a part of this contract. The Contractor shall inform the City in sufficient time to allow arrangements to be made for witness of manufacture and tests. Where the City elects not to observe the manufacture or witness such tests, the Contractor shall provide the City with certifications that the materials and equipment meet the requirements of the specifications.
C. Delivery Acceptance Tests and Inspections. The delivery acceptance tests and inspections shall be at the Contractors expense for any materials or equipment specified herein and shall include the following:
1. Test of items at the place of manufacture during and/or on completion of manufacture, comprising material tests, hydraulic pressure tests, electrical and instrumentation subsystem tests; electric and operating tests, and inspections in accordance with the relevant standards of the industry and
8.k
August 12, 2024
Packet Pg. 284
Technical Specifications Highlands Park Path Project C1811 TP - 22
more particularly as detailed in individual clauses of these specifications to satisfy the City that the items tested and inspected comply with the requirements of this contract.
2. Inspection of all items delivered at the site or to any authorized place of storage in order that the City may be satisfied that such items are of the specified quality and are in good order and condition at the tie of delivery.
To that end, the Contractor shall be prepared to remove all coverings, containers or crates to permit the City to conduct the inspection. Should the City find, in his/her opinion, indication of damage or deficient quality, the Contractor shall provide the necessary documentation or conduct tests deemed necessary by the City to demonstrate compliance.
D. Tests and Inspection. All materials and equipment shall be tested by the Contractor to the satisfaction of the City before any facility is put into operation. Tests shall be as specified in these specifications and shall be made to determine whether the materials and equipment have been properly assembled, aligned, adjusted and connected. Any changes, adjustments or replacements required to make the equipment operate as specified shall be carried out by the Contractor as part of the work.
E. All gauges, meters, recorders and monitors shall be provided by the Contractor as required by the City to supplement or augment the instrumentation system provided under this contract to properly demonstrate that all materials and equipment fully satisfy the requirements of these specifications. All devices employed for the purpose of measuring the performance of the facilitys equipment and systems shall be specifically selected to provide a level of uncertainty consistent with the variables to be monitored. All instruments shall be recently calibrated, and the Contractor shall be prepared at all times to demonstrate, through recalibration, the uncertainty of all instruments employed for testing purposes. Calibration procedures shall be in accordance with applicable standards of ASTM, ISA and IEEE. The adequacy of all gauges, meters, recorders and monitors shall be subject to review of the City.
1.6 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, and test, adjust and balance of equipment as applicable, and to initiate instructions when necessary.
B. Submit qualifications of observer to the Engineer thirty (30) days in advance of required observations. Observer subject to approval of Engineer.
C. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
8.k
August 12, 2024
Packet Pg. 285
Technical Specifications Highlands Park Path Project C1811 TP - 23
1.7 DEFECTIVE MATERIALS TO BE REMOVED
A. All materials not conforming to the requirements of these Specifications shall be considered as defective; and all such materials, whether in place or not, shall be rejected and shall be removed immediately from the site of the work.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 286
Technical Specifications Highlands Park Path Project C1811 TP - 24
SECTION 015050 MOBILIZATION
PART 1 GENERAL
1.1 SUMMARY
A. Mobilization shall include the obtaining of all bonds, insurance, permits, and licenses; furnishing equipment, temporary buildings, leasing of temporary equipment and material storage area, and other construction facilities; all as required for the proper performance and completion of the Work. In addition to this specification, Section 11 Mobilization, paragraph 9-1.16D Mobilization of the Caltrans Standard Specifications shall also apply to this Contract. Mobilization shall include but not be limited to the following principal items:
1. Moving on to the site and furnishing equipment required for the operations.
2. Developing construction water supply.
3. Providing on-site sanitary facilities and potable water facilities as specified in Section 015100, Temporary Utilities and Facilities.
4. Arrangement for and erection of Contractors work and storage yard, including
site security.
5. Contractor is advised that there may be insufficient area within the construction zone to provide parking, staging for material and storage of equipment.
6. Providing a meeting room at the Contractors work and storage yard, 8.
Posting all EPA and OSHA required notices and establishment of safety programs.
7. Have the Contractors superintendent at the job site full time.
8. Submittal and City acceptance of the Construction Schedule.
9. Establishing site security, lighting, fencing, and signing.
10. Obtaining all bonds, insurance, permits, and licenses.
11. Providing public outreach for the duration of the project, including, but not limited to, pre-construction notices, construction area signage, community outreach, etc. Outreach to be coordinated with the various submittals required by the Contractor for coordination, traffic and pedestrian control, and general site controls for the project.
B. Mobilization does not include costs associated with temporary traffic control.
1.2 NOTIFICATION OF RESIDENTS AND BUSINESSES
A. This work shall include furnishing and distributing advance notice flyers to residents and businesses on all streets and including side/cross streets adjacent, and all emergency, public transportation, and garbage/recycle collection services where contract work is to be performed. Notices shall be consistent with dates provided and posted on No Parking Tow Away signs.
B. Notifications shall include at least the following information:
8.k
August 12, 2024
Packet Pg. 287
Technical Specifications Highlands Park Path Project C1811 TP - 25
1. Identification of Contractor(s) including emergency contact name(s) and phone number(s),
2. Description of work,
3. Dates and times of construction, and
4. Information regarding street closures and/or detouring.
C. The contractor shall submit to the City an advance notice flyer in the form of a letter or door hanger for review and approval.
PART 2 PRODUCTS
2.1 ADVANCE NOTICE FLYERS
A. Flyer shall contain a general description of the work to be done, a schedule identifying the street segment and date that work is to be performed, and any restrictions that will be imposed as a result of the work.
2.2 NO PARKING SIGNS
A. City will provide No Parking signs for the Contractors use on this project.
Contractor shall arrange for the pickup of signs not less than seven days prior to being needed.
PART 3 EXECUTION
3.1 DISTRIBUTION OF FLYERS
A. Advance notice flyers shall be hand delivered by the Contractor to residents, schools, or businesses along the impacted streets, including side/cross streets adjacent at least seven to ten (7-10) calendar days in advance of the street closure.
Notices shall also be placed on the front window of all vehicles parked against the curb. If different notices are used for different areas, the Contractor shall take care to deliver the appropriate notice to the correct location. In the vicinity of school areas, Contractor shall coordinate with City Staff and school principals to notify the parents of any changes in traffic patterns, detours, or parking restrictions. The notification shall include a copy of the approved Traffic Control Plan or detours around the school area.
B. Notification shall consist of a procedure of written one-week notices (handouts and/or mailings), and door-to-door notifications 24 hours prior to starting work for every phase of construction.
3.2 NO PARKING SIGNS
A. If necessary, No Parking Tow Away signs shall be posted on the front and back of Type II barricades, spaced no greater than 100-feet apart, a minimum of 48 hours in advance of all work requiring parking restrictions. Only the date in which the parking restriction is needed shall be printed (in 2-inch letters) on the sign. All
8.k
August 12, 2024
Packet Pg. 288
Technical Specifications Highlands Park Path Project C1811 TP - 26
signs must be removed immediately after the work requiring the parking restriction has been completed.
B. The first barricade of each block, on both sides of the street, in both directions of travel (4 totals) shall contain, in addition to the No Parking Tow Away sign, the advance notice flyer to provide property owners with a general description of the work to be done. The Contractor shall notify the inspector 48 hour in advance of the operation. City inspector will verify the posting and notify the police department.
3.3 PUBLIC OUTREACH
A. Public Outreach
1. The Contractor shall apply a proactive public outreach approach to construction operations throughout the duration of the project, including noticing the public prior to the beginning of construction activities. Outreach shall be coordinated with the project schedule and project components such as: traffic and pedestrian controls; noticing for residents; businesses; schools; etc. Ensure that the building/property manager or owner receives notifications for managed properties (i.e., apartments, businesses). Public outreach activities need to match updates to the project schedule, and also be timed appropriately for work items.
2. Multiple public notifications shall be provided for various work items as described elsewhere in the specifications.
3. Public outreach shall include daily and weekly activities to notify the public of construction impacts and progress. The Contractor shall designate a construction crew member for public outreach (outreach lead), who will be responsible for handling public outreach tasks and coordination, including coordination with the City. The outreach lead shall attend construction progress meetings.
4. Contractor shall utilize the projects web-based document management system for the transmittal of outreach materials for City and public.
5. Providing public outreach for the duration of the project, including, but not limited to, pre-construction notices, construction area signage, weekly electronic- based communication, community outreach, etc. Outreach to be coordinated with the various submittals required by the Contract for coordination, traffic and pedestrian control, and general site controls for the project.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 289
Technical Specifications Highlands Park Path Project C1811 TP - 27
SECTION 015100 TEMPORARY UTILITIES AND FACILITIES
PART 1 GENERAL
1.1 SUMMARY
A. It shall be the Contractor's responsibility to provide labor and equipment that is adequate for the performance of the Work under this Contract within the time specified. All equipment shall be kept in satisfactory operating condition, shall be capable of safely and efficiently performing the required Work.
1.2 POWER AND LIGHTING
A. Power: The Contractor shall provide all necessary temporary power, including fuel, required for its operations under the Contract, including operation of traffic control devices, lighting, etc., and shall provide and maintain all temporary power lines required to perform the Work in a safe and satisfactory manner.
B. Construction Lighting: All Work conducted at night or under conditions of deficient daylight shall be suitably lighted to ensure proper Work and to afford adequate facilities for inspection and safe working conditions. All construction lighting shall be shielded to reduce light from affecting non-work areas.
C. Approval of Electrical Connections: All temporary connections for electricity shall be subject to approval of the City, the Engineer and the power company representative, and shall be removed in like manner at the Contractor's expense prior to final acceptance of the Work by the City.
D. Separation of Circuits: Unless otherwise permitted by the Engineer, circuits separate from lighting circuits shall be used for all other power purposes.
E. Construction Wiring: All wiring for temporary electric light and power shall be properly installed and maintained and shall be securely fastened in place. All electrical facilities shall conform to the requirements of Title 8, Industrial Relations, Subchapter 5, Electrical Safety Orders, California Administrative Code; and Subpart K of the OSHA Safety and Health Standards for Construction.
1.3 WATER SUPPLY
A. General: The Contractor shall be responsible for making necessary arrangements for obtaining construction water, and shall include the cost of obtaining and use of water in the various bid prices for the project.
1.4 SANITATION
A. Toilet Facilities: Fixed or portable chemical toilets shall be provided wherever needed for the use of employees and shall be regularly maintained to provide
8.k
August 12, 2024
Packet Pg. 290
Technical Specifications Highlands Park Path Project C1811 TP - 28
clean, sanitary conditions.
B. Sanitary and Other Organic Wastes: The Contractor shall establish a regular twice weekly collection of all sanitary and organic wastes. All wastes and refuse from sanitary facilities provided by the Contractor or organic material wastes from any other source related to the Contractor's operations shall be disposed of away from the site in a manner satisfactory to the Engineer and in accordance with all laws and regulations pertaining thereto.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 291
Technical Specifications Highlands Park Path Project C1811 TP - 29
SECTION 015550 TEMPORARY TRAFFIC CONTROL SYSTEMS
PART 1 GENERAL
A. Contractor is responsible for comprehensive site-wide temporary traffic control provisions. Under this item of work, Contractor is also responsible for providing regional temporary traffic control signs and Changeable Message Signs.
1.1 SUBMITTALS
A. Administrative Submittals: Copies of permits and approvals for construction as required by Laws and Regulations and governing agencies.
B. Shop Drawings:
1. Traffic Control, Detour & Routing Plans, Pedestrian Control, and School Zone Access & Pedestrian Control Plans: As specified herein, and proposed revisions thereto. Submittals shall consider both the standard work day and nighttime operations.
C. Traffic Control Engineer: Qualifications of proposed traffic control engineer.
1.2 VEHICULAR TRAFFIC
A. Traffic Control Plan: Detailed traffic control plans shall show the locations of traffic cones, k-rail, construction zones, flaggers, stored pipe and materials, construction truck access, barricades, detours, signs, changeable message boards, and other traffic control facilities. Submit traffic control plans five (5) working days prior to start of construction and throughout all construction stages as the Work progresses.
B. Regional Traffic Management: Regional traffic control plans shall show the locations of access routes, closures, detours, temporary traffic signs, construction signage, changeable message boards, and other regional traffic control facilities.
Plan shall show and accommodate adjacent projects. Submit traffic control plans five (5) working days prior to start of construction and throughout all construction stages as the Work progresses.
C. Traffic Routing Plan: Show sequences of construction affecting the use of roadways, time required for each phase of the Work, provisions for decking over excavations and phasing of operations to provide necessary access, and plans for signing, signaling, barricading, and striping to provide passages for pedestrians and vehicles. Include schedule for covering traffic control signs (including detour signs) when not in use and uncovering just prior to use. Show applicable signs for each individual construction stage.
D. Each afternoon at 3 p.m., meet with City or its designated representative to describe the following day's construction operations and the traffic control provisions. At each meeting, submit a detailed update of traffic control provisions and construction crew locations. This shall be submitted in hardcopy and
8.k
August 12, 2024
Packet Pg. 292
Technical Specifications Highlands Park Path Project C1811 TP - 30
electronic form using a Word file. The update shall contain a list of signs and the time and location for covering and uncovering signs.
1.3 TRAFFIC CONTROL ENGINEER
A. The Traffic Control Plans and updates shall be prepared and presented by a registered civil engineer with expertise in traffic control (hereinafter designated as the Traffic Control Engineer). The Traffic Control Engineer shall develop and update Traffic Control Plans, oversee the field implementation of Traffic Control Plans, and provide quality assurance for compliance with traffic control procedures.
B. Each evening and morning, signs shall be covered and uncovered as needed to inform the public of roadway closures, detours, work zones, and other traffic information. Each evening just before crews leave, all signs not required shall be covered and all signs required shall be uncovered. Each morning before start of construction, all signs not required shall be covered and all signs required shall be uncovered. The Traffic Control Engineer shall oversee the covering and uncovering of signs each evening and morning.
C. Traffic Control Engineer shall be responsible for verifying that property owner/occupant notifications are made in accordance with Contract requirements.
PART 2 PRODUCTS
2.1 CIP PROJECT SIGN
A. Material: Aluminum 0.080
B. Size: 24x36
C. Round all corners
D. Colors:
a. Border white,
b. Background Green,
c. City of San Carlos Logo Black, Green, and Yellow,
d. Text white.
PART 3 EXECUTION
3.1 TRAFFIC CONTROL
A. Traffic control shall be done in accordance with the Traffic Constraints Drawings, Caltrans Standard Plans & Specifications, and the California Manual on Uniform Traffic Control Devices (California MUTCD, Caltrans, January 21, 2010), and the City of San Carlos Standards and Specifications.
B. Non-closure traffic control: Work that interferes with public traffic, either one-lane or two-lane traffic, shall not cause any traffic delays to public traffic between 7 a.m. to 8:30 a.m., nor more than 5-minute delays to public traffic between the hours of 8:30 a.m. to 4:30 p.m. Local traffic shall not be delayed at any time for more than 5 minutes. School buses shall not be delayed for more than 1 minute. During non-
8.k
August 12, 2024
Packet Pg. 293
Technical Specifications Highlands Park Path Project C1811 TP - 31
working hours, Saturdays, Sundays, and holidays, the full width of the traveled way in both directions shall be open for use by the public, unless approved for closure.
Where road is closed to through traffic, full width of the roadway shall be open for local traffic during non-working hours. During working hours, one lane of the roadway shall be open for local traffic in both directions except as permitted in advance by the Engineer. Holidays shall be those designated by the City of San Carlos.
1. Emergency Response Vehicles shall not be impeded at any time.
C. Work hours shall be as stated in Special Provisions. Work hours shall be further limited to daylight hours. Daylight hours are defined as 1/2 hour after sunrise and 1/2 hour before Sunset.
D. Contractor shall fill or plate the trench at the end of each working day. Trench plates shall be textured to inhibit skidding. Use cold-patch or other means to feather transition at 3.3 percent (30:1) to plates. Where pit operations remain unfilled, steel plating shall be provided during non-working hours.
E. Traffic Control Engineer shall provide routine surveillance of project during non- working hours. Contractor shall provide the name and phone number for the Contractors contact person for nighttime project operations. Replacement of non- working or stolen controls is required prior to commencing with construction.
F. Minimum lane width during construction shall be 11 feet, unless noted otherwise.
1. Nearest travel lane edge (tubular marker delineators) shall be no less than 8 feet from the edge of open trench. Contractor shall use K-Rail if 8 foot cannot be maintained
2. Where cones are used to separate traffic lane from construction zone, do not use traffic lane for accessing construction zone and do not store materials or equipment on or near shoulder of traffic lane side of roadway.
G. Whenever it is necessary to cross, close, or obstruct driveways and walks, whether public or private, provide and maintain suitable and safe bridges, detours, or other temporary expedients for accommodation of public and private travel.
H. Driveway and Private Road Closures: Maintain satisfactory means of exit for persons residing or having occasion to transact business along the route of the Work. If it is necessary to close off vehicular access to property for periods greater than 2 hours, provide written notice to each owner/occupant so affected, 3 days prior to such closure. Steel traffic plates shall be readily accessible in case of emergency.
I. Maintain top of backfilled trenches before they are paved to allow normal vehicular traffic to pass over. Provide temporary access driveways where required. Cleanup operations shall follow immediately behind backfilling.
J. Notify the fire department, police/sheriff department, highway patrol, ambulance service, local school district, post office, refuse companies and transit agencies
8.k
August 12, 2024
Packet Pg. 294
Technical Specifications Highlands Park Path Project C1811 TP - 32
five (5) working days before closing roadway or portion thereof. Notify said departments or agencies when streets are again passable for vehicles. Conduct operations with the least interference to fire equipment access, and at no time prevent such access. Furnish Contractors night emergency telephone numbers to the police or sheriff's department.
K. Move mailboxes to temporary locations accessible to postal service and on completion of Work in each area, replace them in their original location and in a condition equal to or better than original.
L. Contractor shall move property owners (residents) garbage and recycle cans to areas accessible for garbage and recycle pick up. Garbage and recycle cans shall be returned to owners driveway after pick up.
M. Pedestrian and bicycle access along sidewalks and streets will be kept open and safe from construction activities, however necessary closures shall be detour and signed appropriately, per a Pedestrian Control Plan, where applicable.
N. Coordination: Coordinate traffic routing with that of others working in the same or adjacent areas. Coordinate access for garbage pick up, mail delivery, and school buses.
O. Barricades and Lights:
1. Provide as shown on the Traffic Control Plans and in sufficient quantity to safeguard public and Work.
2. Provide as necessary to prevent unauthorized entry to construction areas and affected roads, streets, and alleyways, inside and outside of fenced area, and as required to ensure public safety and the safety of Contractors employees, other employer's employees, and others who may be affected by the Work.
3. Provide to protect existing facilities and adjacent properties from potential damage.
4. Locate to enable access by facility operators and property owners.
5. Protect streets, roads, highways, and other public thoroughfares that are closed to traffic by effective barricades with acceptable warning signs.
6. Locate barricades at the nearest intersecting public thoroughfare on each side of the blocked section and at any additional locations indicated on the Traffic Control Plan.
P. Temporary Pavement Markings:
1. Temporary Pavement Delineation: Whenever Contractors operations reduce visibility of pavement delineation (lane lines, either pavement markers or painted lines or both, or temporary delineation) and pavement marking, such pavement delineation and pavement marking shall be replaced by either permanent or temporary delineation and marking before opening the traveled way to public traffic. Temporary delineation and marking shall consist of reflective traffic tape or reflective pavement markers, as determined by Engineer. Reflective tape for temporary delineation shall be applied in pieces not less than 24 inches long, or less
8.k
August 12, 2024
Packet Pg. 295
Technical Specifications Highlands Park Path Project C1811 TP - 33
than 4 inches wide, spaced no more than 24 feet apart. Reflective tape for pavement markings shall be placed to approximate the obliterated pavement markings, as determined by Engineer. Reflective traffic tape or reflective pavement markers shall be applied in accordance with the manufacturer's instructions. In areas where construction activity removes the pavement, Contractor shall use portable delineators (18 inches high by 2 inches wide) to designated travel lanes. Portable delineators shall be in accordance with the Standard Specifications. Once asphalt "plugging" of trench and damaged areas is complete, pavement markings and striping shall be replaced. Temporary pavement delineation shall be maintained by Contractor, at his own expense, until it is replaced with permanent delineation. Final pavement markings and striping shall be done after completion of overlay.
Q. Signs and Equipment:
1. Traffic control signs and equipment shall be placed as shown on Traffic Constraint Drawings and as directed by the City.
2. Contractor shall maintain existing traffic control signs during construction.
Roadway facilities and signs shall be protected in accordance with Section 15-1.02 and 7-1.11 of the Standard Specifications.
3. Portable TOW-AWAY-NO STOPPING Signs: Place where approved by police or California Highway Patrol.
4. TOW-AWAY-NO STOPPING signs shall be posted seventy-two (72) hours prior to construction activity requiring removal.
5. Portable BUSINESSES ARE OPEN Signs: Place at accesses to businesses in the vicinity of construction activities.
6. Tubular Markers or Traffic Safety Drums: Provide to delineate traffic lanes to guide and separate traffic movements.
7. Provide at obstructions, such as material piles and equipment, as directed by Engineer.
8. Illuminate barricades and obstructions with warning lights from sunset to sunrise, or as directed by Engineer.
9. Use to alert general public of construction hazards, which would include surface irregularities, unramped walkways, grade changes, and trenches or excavations in roadways and in other public access areas.
10. Post-mount informational signs (all ends of detour and throughout detour vicinity) of detour 5 working days before detouring any traffic as to the date, time, and duration of the detour. Sign shall be stenciled with 6-inch black letters on a retro-reflective orange background. Signs shall meet Caltrans specifications.
11. Place solar powered barricade-type lights on DETOUR signs and construction speed limit signs.
12. All portable and night use signs shall use "diamond" grade reflective lettering.
13. Detour signs shall be covered when not in use and uncovered just prior to use. Detour signs shall be covered with wood or metal. The use of easily displaced material such as plastic bags, burlap sacks, duct tape, etc. is not acceptable. All signs that are not applicable to the current construction stage shall be removed or covered.
8.k
August 12, 2024
Packet Pg. 296
Technical Specifications Highlands Park Path Project C1811 TP - 34
R. At each road closure barricade, a flagger shall be provided. For each single-lane closure, flaggers shall be provided for each crew. Flaggers shall have radios for communication with other flaggers and with crew foremen. Flaggers shall not leave their posts unattended for any length of time. Provide replacement flaggers as required for continuous coverage.
S. Payment Reductions:
1. Owner reserves the right to retain amounts for non-compliance with the requirements of Section 015550, Traffic Control, and Section 015600, Protection of Existing Facilities, as follows:
a. Non-compliance related to safety for workers or the traveling public:
1) First non-compliance: $1,000.
2) Second non-compliance: $5,000.
3) Third non-compliance: $10,000.
4) Fourth and subsequent non-compliances, each: $25,000. b. Safety related non-compliance relates to lack of k-rail, cones, barricades, light towers, reflective vests, delineators, flaggers, temporary or permanent striping, crash cushions, emergency access, warning signage, non-skid plates, sufficient clearance of stored pipe, dirt and mud free roads, or to other conditions such as uneven roads that endanger workers or the traveling public. c. Non-compliance related to work hours in City right-of-way:
1) $100 for each minute beyond the work hour limits.
d. Non-compliance related to disruption of the traveling public other than work hour non-compliance:
1) First non-compliance: $0.
2) Second non-compliance: $500.
3) Third non-compliance: $1,000.
4) Fourth and subsequent non-compliances, each: $5,000. e. Non-compliance related to disruption of the traveling public relates to lack of informational or detour signage, failure to cover or uncover signs, failure to meet sequencing and completion. requirements of pipeline segments and locations, or to other conditions that give rise to disruption of the public such as blocked driveways, any delay to a school bus greater than 1 minute or delays related to lack of flaggers or radios.
f. If non-complying work items are not corrected in the timeframe designated by Engineer, the City may perform the Work. For such Work, the cost, plus 100 percent for administration and overhead, will be retained from payments. This amount is in addition to the amounts indicated above.
g. Amounts retained shall be credited to the Owner through a Change Order to the Contract.
3.2 CIP PROJECT SIGN
A. The Vector files for the sign and logos shall be supplied to the sign manufacturer
8.k
August 12, 2024
Packet Pg. 297
Technical Specifications Highlands Park Path Project C1811 TP - 35
upon request. The Contractor shall provide the Company name and a 24-hour toll- free contact phone number on the sign. The Contractor shall check with the Project Manager to obtain the project name and telephone number before fabricating the sign.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 298
Technical Specifications Highlands Park Path Project C1811 TP - 36
SECTION 015600 PROTECTION OF EXISTING FACILITIES
PART 1 GENERAL
1.1 SUMMARY
A. The Contractor shall protect all existing utilities and all other improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements to a condition equal to or better than they were prior to such damage or temporary relocation, all in accordance with requirements of the Contract Documents.
B. The Contractor shall verify the exact locations and depths of all utilities shown and the Contractor shall make exploratory excavations of all utilities that may interfere with the Work. All such exploratory excavations shall be performed as soon as practical after award of contract and, in any event, a sufficient time in advance of construction to avoid possible delays to the Contractor's work. When such exploratory excavations show the utility location as shown to be in error, the Contractor shall so notify the Engineer, and shall incorporate updated utility locations into the project record drawings.
C. In the event it is necessary to respond with City crew in lieu of the Contractor to repair damages done to any City facilities caused by the Contractors operations or as a consequences thereof, there shall be a minimum mobilization cost fee of $500 for administrative overhead, billing and equipment use in addition to the actual hourly overhead rate (including benefits) billed for City employees and any materials costs. The Contractor shall be obligated to pay this amount separately to the City prior to the completion of the project and retention payment. The use of City crews will be at the discretion of the City.
D. If a hazardous condition is observed and the City notifies the Contractor either directly or by telephone, the Contractor shall correct the condition immediately. If the Contractor fails to correct the condition immediately, the City reserves the right to call a local supplier(s) or Contractor to install the necessary measures such as lights, barricades, etc. The cost involved shall be deducted from any money due (or to become due) to the Contractor.
E. Contractor shall perform a preconstruction photo survey to document the condition of existing improvements. The Contractor shall be responsible to adequately document the condition for size, kind, quantity and the extent of existing improvements. Photographs shall be for the purpose of documenting the pre- existing condition at the site of work. All surveys shall be delivered to the City prior to commencing work. In the absence of adequate preconstruction documentation, the Engineers judgment shall be final.
8.k
August 12, 2024
Packet Pg. 299
Technical Specifications Highlands Park Path Project C1811 TP - 37
1.2 RIGHTS-OF-WAY
A. The Contractor shall not do any work that would affect any gas, sewer, storm drain, waterline, recycled waterline, telephone, railroad, or electric line, any fence, or any other structure, nor shall the Contractor enter upon the rights-of-way involved until notified by the Engineer that the City has secured authority therefore from the proper party. After authority has been obtained, the Contractor shall give said party due notice of its intention to begin work, and shall give said party convenient access during the Contractors work. When two or more contracts are being executed at one time on the same or adjacent land in such manner that work on one contract may interfere with that on another, the City shall determine the sequence and order of the Work. When the territory of one contract is the necessary or convenient means of access for the execution of another contract, such privilege of access or any other reasonable privilege may be granted by the City to the Contractor so desiring, to the extent, amount, in the manner, and at the times permitted. No such decisions as to the method or time of conducting the Work or the use of territory shall be made the basis of any claim for delay or damage, except as provided for temporary suspension of the Work.
1.3 PROTECTION OF SURVEY MONUMENTS OR ROADWAY MARKERS
A. Monuments placed by Surveyors must be preserved, in accordance with State Business & Professions Code section 8771. The Contractor shall not destroy, remove, or otherwise disturb any existing survey monuments, markers or other existing street or roadway markers without proper authorization. No pavement grinding, breaking or excavation shall be started until all survey or other permanent marker points that will be disturbed by the construction operations have been properly referenced for easy and accurate restoration. It shall be the Contractor's responsibility to notify the proper representatives of the City of the time and location that work will be done. Such notification shall be sufficiently in advance of construction so that there will be no delay due to waiting for survey points to be satisfactorily referenced for restoration.
B. If monuments are disturbed by the Contractor, the Contractor shall hire a licensed surveyor to prepare and process a corner record or record of survey as appropriate through the City to reset the monuments. Surveyor records shall show the position of replacement monuments and post construction position of other monuments within the work area post-construction. The cost of preparing the necessary survey documents, processing the survey documents, and resetting the monuments shall be paid for by the Contractor. This work shall be completed prior to project acceptance and additional monies will be withheld for this work prior to the release of retention.
1.4 RESTORATION OF PAVEMENT
A. General: All paved areas including asphaltic concrete berms cut or damaged during construction shall be replaced with similar materials and of equal thickness to match the existing adjacent undisturbed areas, except where specific
8.k
August 12, 2024
Packet Pg. 300
Technical Specifications Highlands Park Path Project C1811 TP - 38
resurfacing requirements have been called for in the Contract Documents or in the requirements of the agency issuing the permit. All temporary and permanent pavement shall conform to the requirements of the affected pavement owner. All pavements which are subject to partial removal shall be neatly saw cut in straight lines.
B. Temporary Trench Restoration: Wherever required by the public authorities having jurisdiction, the Contractor shall place temporary surfacing promptly after backfilling and shall maintain such surfacing for the period of time fixed by said authorities before proceeding with the final restoration of improvements. The typical trench detail on the plans provides further information for temporary asphalt surfacing.
C. Permanent Trench Restoration: In order to obtain a satisfactory junction with adjacent surfaces, the Contractor shall saw cut back and trim the edge so as to provide a clean, sound, vertical joint before permanent replacement of an excavated or damaged portion of pavement. Damaged edges of pavement along excavations and elsewhere shall be trimmed back by saw cutting in straight lines.
All pavement restoration and other facilities restoration shall be constructed to finish grades compatible with adjacent undisturbed pavement. The typical trench detail on the plans provides further information for permanent trench restoration.
D. After all infrastructure has been installed and tested, and final approval of all testing has been provided by the City or its representative, the Contractor shall overlay all roadways affected by the Work per the drawings and Specification 321216, Paving Systems.
E. Restoration of Sidewalks or Private Driveways: Wherever sidewalks or private roads have been removed or damaged during construction, the Contractor shall place suitable temporary sidewalks or roadways promptly after backfilling and shall maintain them in satisfactory condition for the period of time fixed by the authorities having jurisdiction over the affected portions before proceeding with the final restoration or, if no such period of times is so fixed, the Contractor shall maintain said temporary sidewalks or roadways until the final restoration thereof has been made.
1.5 EXISTING UTILITIES AND IMPROVEMENTS
A. General: The Contractor shall protect all Underground Utilities and other improvements which may be impaired during construction operations. It shall be the Contractor's responsibility to ascertain the actual location of all existing utilities and other improvements that will be encountered in its construction operations, and to see that such utilities or other improvements are adequately protected from damage due to such operations. The Contractor shall take all possible precautions for the protection of utility lines to provide for uninterrupted service and to provide such special protection as may be necessary. Protection of existing utilities may include soil stabilization.
8.k
August 12, 2024
Packet Pg. 301
Technical Specifications Highlands Park Path Project C1811 TP - 39
B. Culverts: Existing culverts in and adjacent to the work area shall be protected from disturbance by the Contractors activities relating to the Work. The Engineer shall be notified immediately if an existing culvert is disturbed as a result of construction activities. All costs associated with disturbing existing culverts shall be borne by the Contractor.
C. Utilities to be Moved: In case it shall be necessary to move the property of any public utility or franchise holder, such utility company or franchise holder will, upon request of the Contractor, be notified by the City to move such property within a specified reasonable time. When utility lines that are to be removed are encountered within the area of operations, the Contractor shall notify the Engineer a sufficient time in advance for the necessary measures to be taken to prevent interruption of service.
D. Where the proper completion of the Work requires the temporary or permanent removal and/or relocation of an existing utility or other improvement which is shown the Contractor shall remove and, without unnecessary delay, temporarily replace or relocate such utility or the facility. In all cases of such temporary removal or relocation, restoration to former location shall be accomplished by the Contractor in a manner that will restore or replace the utility or improvement to its former location and in new condition.
E. City's Right of Access: The right is reserved to the City and to the owners of public utilities and franchises to enter at any time upon any public street, alley, right-of- way, or easement for the purpose of making changes in their property made necessary by the Work of this Contract.
F. Underground Utilities Shown or Indicated: Existing utility lines that are shown or the locations of which are made known to the Contractor prior to excavation and that are to be retained, and all utility lines that are constructed during excavation operations shall be protected from damage during excavation and backfilling and, if damaged, shall be immediately repaired by the Contractor.
G. Underground Utilities Not Shown or Indicated: Contractor is responsible to verify location of all utilities, whether shown in the plans or not. All costs for locating, replacement and/or repair of existing utilities shall be borne by the Contractor.
H. In the event that the Contractor damages any existing utility lines, a written report thereof shall be made immediately to the Engineer.
I. All water services that are damaged during construction of trenching operations shall be reconstructed from the corporation stop to the meter (for small diameter services or reconstructed from the gate valve to the meter (for larger diameter services), and all services shall be sleeved with PVC pipe prior to backfilling.
J. Approval of Repairs: All repairs to a damaged improvement are subject to inspection and approval by an authorized representative of the improvement owner
8.k
August 12, 2024
Packet Pg. 302
Technical Specifications Highlands Park Path Project C1811 TP - 40
before being concealed by backfill or other work.
K. Maintaining in Service: All oil and gasoline pipelines, power, and telephone or other communication cable ducts, gas and water mains, irrigation lines, sewer lines, storm drain lines, poles, and overhead power and communication wires and cables encountered along the line of the Work shall remain continuously in service during all the operations under the Contract, unless other arrangements satisfactory to the Engineer are made with the owner of said pipelines, duct, main, irrigation line, sewer, storm drain, pole, or wire or cable. The Contractor shall be responsible for and shall repair all damage due to the Contractors operations, and the provisions of this Section shall not be abated even in the event such damage occurs after backfilling or is not discovered until after completion of the backfilling.
L. Pipeline Connections. The Contractor shall make all necessary connections to the existing pipelines. No connections to the existing system shall be made unless authorized in writing by the City or Engineer.
M. Repair couplings on sanitary sewer laterals and water services are not allowed. All repairs shall be completed to the nearest existing pipe joint, asbestos cement (ACP) sanitary sewer laterals shall be taken back to the nearest existing joint and shall not be cut ACP. All removed pipe material shall be disposed of by the Contractor per State and local requirements. All costs for disposal of existing materials shall be borne by the Contractor.
1.6 TREES WITHIN STREET RIGHTS-OF-WAY AND PROJECT LIMITS A. General: The Contractor shall exercise all necessary precautions so as not to damage or destroy any trees or shrubs, including those lying within street rights- of-way and project limits, and shall not trim or remove any trees unless such trees have been approved for trimming or removal by the City or other jurisdictional agency. All existing trees and shrubs which are damaged during construction shall be trimmed or replaced by the Contractor under the directions of an arborist certified by the Western Chapter of the International Society of Arboriculture hired by the Contractor or a certified tree company hired by the Contractor to the satisfaction of the City and/or agency. Tree trimming and replacement shall be accomplished in accordance with the following paragraphs.
B. Trimming: The natural shape and form of the tree shall be preserved and enhanced; no stubs or splits or torn branches left; no topping or drop crotching; and clean cuts shall be made close to the trunk or large branches.
C. Replacement: The Contractor shall immediately notify the City and/or other jurisdictional agency if any tree is damaged by the Contractor's operations. If, in the opinion of the City or said other agency, the damage is such that replacement is necessary, the Contractor shall replace the tree at its own expense. The size of the trees shall be not less than 1-inch diameter nor less than 6 feet in height. Fines will be assessed against the Contractor for trees removed without the City's prior written approval. The minimum amount of fine or restitution to the City will be the
8.k
August 12, 2024
Packet Pg. 303
Technical Specifications Highlands Park Path Project C1811 TP - 41
replacement of the tree removed, with one of equal or greater size and maturity and as approved by the City. Larger fines may be assessed against the Contractor depending upon the circumstances and type of tree removed, especially in the case of oak trees, and/or those trees listed on the City of San Carlos' and/or County of San Mateos Historical Tree Lists.
D. Any roots encountered greater than 2-inches in diameter shall be performed under the direct supervision of and in conformance with the recommendations of an arborist certified by the Western Chapter of the International Society of Arboriculture.
E. The Contractor shall furnish all tools and equipment and employ sufficient trained personnel to operate all equipment and perform all handwork efficiently and skillfully.
F. The Contractor shall be held responsible for any damage to trees, vegetation, or private property caused by its construction operations.
1.7 NOTIFICATION BY THE CONTRACTOR
A. Prior to any excavation in the vicinity of any existing underground facilities, including all water, sewer, storm drain, gas, petroleum products, or other pipelines; all buried electric power, communications, or television cables; all traffic signal and street lighting facilities; and all roadway and state highway rights-of-way the Contractor shall notify the Underground Service Alert agency and the respective authorities representing the owners or agencies responsible for such underground facilities not less than 48 hours prior to excavation so that a representative of said owners or agencies can be present during such work if they so desire.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 304
Technical Specifications Highlands Park Path Project C1811 TP - 42
SECTION 020010 SITE CONDITIONS
PART 1 GENERAL
1.1 INFORMATION ON SITE CONDITIONS
A. Information obtained by the City regarding site conditions, subsurface information, existing construction of site facilities and similar data will be available to prospective Bidders upon request at the office of the Engineer, prior to bid opening. This geotechnical investigation is not a part of this Contract. The investigation was performed for design purposes.
B. Investigations conducted by Geotechnical Engineer of subsurface conditions were made for the purpose of study and design, and neither the Engineer nor the City assume any responsibility in respect to the sufficiency or accuracy of the soil borings, or of other investigations that have been made, or of the interpretations made thereof, and there is no warranty or guarantee, either expressed or implied, that the conditions indicated by such investigations are representative of those existing throughout such area, or any part thereof, or that unforeseen for developments may not occur.
C. Any logs of test borings, pits, geotechnical reports, or topographic maps showing a record of the data obtained by the Engineer's investigations of surface and subsurface conditions that are made available, shown on the plans, or bound herewith shall not be considered a part of the Contract Documents, said logs representing only the opinion of the Engineer as to the character of the materials encountered by him in his investigations and are provided only for the convenience of the Bidders.
D. Information derived from inspection of logs of test borings, pits, topographic maps, geotechnical reports, or from Plans showing locations of utilities and structures will not in any way relieve the Contractor from any risk, or from properly examining the site and making such additional investigations as he may elect, or from properly fulfilling all the terms of the Contract Documents.
1.2 CONTRACTOR'S RESPONSIBILITIES
A. The Contractor shall satisfy himself as to the nature and location of the Work, the general and local conditions, particularly those bearing upon availability of transportation, disposal, limited access to site, handling and storage of materials, availability of labor, water, electric power, roads, and uncertainties of weather, river stages, or similar physical conditions at the site, the conformation and conditions of the ground, the character of equipment facilities needed preliminary to and during the prosecution of the Work and all other matters which can in any way affect the Work or the cost thereof under this Contract.
B. The Contractor shall further satisfy himself as to the character, quality, and quantity of surface and subsurface materials to be encountered during the course of execution of the work by inspecting the site as well as, any exploratory work performed by the
8.k
August 12, 2024
Packet Pg. 305
Technical Specifications Highlands Park Path Project C1811 TP - 43
Engineer, and information presented by the Plans and Specifications made a part of this Contract. Any failure by the Contractor to acquaint himself with all available information will not relieve him from responsibility for properly estimating the difficulty or cost of successfully performing the Work. The Contractor shall use their own judgment in determining methods for safe construction, with awareness of the specific site conditions for this project.
C. The Contractor shall anticipate underground obstructions such as utility lines, concrete, water table, soil conditions and debris. No extra payment will be allowed for the removal, replacement, repair or possible increased cost associated with existing utilities, trench instability or groundwater. Any utility lines or obstructions indicated on the map show only the approximate location and must be verified in the field by the Contractor. Even excavations that do not daylight into the limits of existing trench backfill can become unstable due to the effects of ground disturbance and reduced strength caused by past nearby excavations and backfills. The Contractor is responsible for locating all underground obstructions.
D. The Contractor shall note that heavy truck and equipment operations may cause roadway damage in excess of normal usage. Damage caused to the streets, curbs, gutters, sidewalks or bike path by the Contractor's operations shall be repaired to a condition equal or better than the original condition at the Contractor's expense.
1.3 ADDITIONAL INFORMATION
A. Prior to bidding, Bidders may make their own subsurface investigations subject to time schedules and arrangements approved in advance by the City. Before any subsurface test holes are excavated, obtain necessary permits to perform such work.
B. Record drawings of existing utilities are available for examination at City offices.
1.4 SURFACE FACILITIES
A. The Contractor is advised that the Plans were prepared based on available information and, therefore, all existing surface facilities may not be shown on the Plans. It is the Contractor's responsibility to acquaint himself with existing site conditions per this Section and anticipate those surface facilities which are typically encountered (fences, signs, mailboxes, sidewalks, driveways, ditches, AC pavement, AC dikes, curbing, power poles, overhead lines, landscaping, irrigation, etc.) and will affect the Work. The Contractor shall provide adequate security to protect the public and Work. No extra payment will be made to the Contractor for the repair, removal and replacement of such facilities. Full payment for this work shall be as included in the various bid items.
PART 2 PRODUCTS
Not Used.
8.k
August 12, 2024
Packet Pg. 306
Technical Specifications Highlands Park Path Project C1811 TP - 44
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 307
Technical Specifications Highlands Park Path Project C1811 TP - 45
SECTION 020020
STORM WATER POLLUTION CONTROL
1.1 DESCRIPTION
A. The Contractor shall provide all materials, equipment, and labor necessary to furnish, place, and maintain all water pollution control systems, including construction, maintenance, and inspection of said systems, as required to perform the work in accordance with Section 13, Water Pollution Control, Section 5-1.36, Property and Facility Preservation, of the State Standard Specifications.
B. Water pollution control work shall conform to the requirem ents in the latest edition of the "Storm Water Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual" and the "Construction Site Bes t Management Practices (BMPs) Manual". Copies of the Manuals may be obtained from t he Department of Transportation, Material Operations Branch, Publication Distribution Unit, 1900 Royal Oaks Drive, Sacramento, California 95815, Telephone: (9 16) 263-0865. Copies of the Manuals may also be obtained from the Department's Intern et Web Site at:
http://www.dot.ca.gov/hq/construc/stormwater.html.
C. The Contractor shall submit the WPCP to the Engineer for review and must be accepted prior to beginning of work. The Contractor shall be fully res ponsible for implementing, maintaining, and repairing all storm water pollution c ontrols as described in his approved WPCP for the duration of the construction contrac t. The Contractor shall make any repairs to the storm water pollution controls and amend the WPCP if, required by the Engineer.
D. The Contractor shall be responsible for any fines imposed by the Regional Water Quality Control Board or other agency as a result of noncompliance, negligence, or violation of permit conditions.
E. Construction vehicles and equipment entering existing paved areas shall be free of mud, silt and other debris during all phases of work. No mud, silt and other debris shall be tracked on paved surfaces. If such materials are tracked on the streets or other paved areas both public and private, the Contractor shall immediately remove these materials prior to these materials entering into the storm drain system.
F. Stockpiling of materials on the street will not be allowed unless otherwise approved by the Engineer. The Contractor shall cover with plastic any construction or excavated materials which may possibly erode and enter the storm drain system of paved streets or other paved areas both public and private. Stockpiling of dirt on paved areas will not be allowed.
G. The Contractor shall sweep the work area and clean up the work site daily before leaving the site.
H. The Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting and maintaining the control measures included in the Water
8.k
August 12, 2024
Packet Pg. 308
Technical Specifications Highlands Park Path Project C1811 TP - 46
Pollution Control Plan (WPCP) and any amendments thereto and for removing and disposing of temporary control measures.
I. To ensure the proper implementation and functioning of temporary erosion control measures, the Contractor shall regularly inspect and maintain the construction site for the control measures identified in the WPCP. The Contractor shall identify corrective actions and time frames to address any damaged measures or reinitiate any measures that have been discontinued.
During the length of the project, inspections of the construction site shall be conducted by the Contractor to identify deficient measures. The inspections shall be, but not limited to as follows:
1. Prior to a predicted storm;
2. After all precipitation which causes runoff capable of car rying sediment from the construction site;
3. At 24 hours intervals during extended precipitation events; and
4. Routinely, on a minimum weekly basis.
5. If the Contractor identifies a deficiency in the deployment or functioning of an identified control measure, the deficiency shall be corrected in a timely manner.
6. If the Engineer identifies a deficiency in the deployment or functioning of an identified control measure, the Contractor will be notified and the deficien cies shall be corrected by the Contractor in a timely manner.
7. Failure to make the necessary repairs or other necessary mai ntenance when directed by the Engineer shall result in the necessary repair work being done by City forces the Contractor will be billed at double the rate of all City expenses.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 309
Technical Specifications Highlands Park Path Project C1811 TP - 47
SECTION 020030 EXISTING UTILITIES AND UNDERGROUND STRUCTURES PART 1 GENERAL
1.1 SECTION INCLUDES
A. Refer to plans for the locations of utilities and underground structures.
B. Contractors responsibilities.
1.2 CALIFORNIA ADMINISTRATIVE CODE
A. Section 1540(a)1 of Construction Safety Orders (Title 8) California Administrative Code, section 1540 states:
(1) Prior to opening and excavation, effort shall be made to determine whether underground installations; i.e., sewer, water, gas, electric lines, storm drain, cable TV, telephone, and fiber optics, will be encountered and, if so, where such underground installations are located. When an excavation approaches the approximate location of such an installation, the exact location shall be determined by careful probing or hand digging; and, when it is uncovered, adequate protection shall be provided for the existing installation. All known owners of underground facilities in the area concerned shall be advised of proposed work at least 48 hours prior to the start of actual excavation.
B. The approximate location of public utilities and underground structures was based on information provided by the utility owners. However, in accordance with California's Administrative Code, Section 1540, Contractor shall make the effort to determine the exact location of underground installations.
1.3 PUBLIC UTILITIES AFFECTED
A. Electrical: Pacific Gas & Electric Company. It should be noted that where overhead service to a structure known to receive service does not exist, then underground service shall be assumed to exist. For underground utility location call Underground Service Alert (USA) at (800) 227-2600 or 811 at least two working days in advance.
B. Natural Gas: Pacific Gas & Electric Company has jurisdiction over natural gas lines. For underground utility location call Underground Service Alert (USA) at (800) 227-2600 or 811 at least two working days in advance.
C. Water Service: California Water Service Company and Mid-Peninsula Water District have jurisdiction over water mains and services within the specific limits of the project corridor.
D. Drainage: The City of San Carlos has jurisdiction over drainage within the corporate limits of San Carlos.
E. Roads: The City of San Carlos has jurisdiction over roads inside the corporate limits
8.k
August 12, 2024
Packet Pg. 310
Technical Specifications Highlands Park Path Project C1811 TP - 48
of San Carlos and the County of San Mateo for roads outside the corporate limits of San Carlos.
F. Cable Television: Comcast. It should be noted that where overhead service to a structure known to receive service does not exist, then underground service shall be assumed to exist. For underground utility location, call USA at (800) 227-2600 or 811 at least two working days in advance.
G. Telephone: AT&T. It should be noted that where overhead service to a structure known to receive service does not exist, then underground service shall be assumed to exist. For assistance with location of underground telephone facilities, call USA at (800) 227-2600 or 811 at least two working days in advance.
H. Sanitary Sewer: The City of San Carlos has jurisdiction over the sewer mains and laterals within the specific limits of the project corridor.
I. Recycled Water: The City of San Carlos has jurisdiction over the recycled water mains and laterals within the specific limits of the project corridor.
1.4 CONTRACTOR RESPONSIBILITY
A. The Contractor shall anticipate water, reclaimed water, sewer, storm drain, electrical, gas, cable TV, and telephone services. It may be expected that there will be variation in location from that as shown on the Plans to the actual location. Actual location shall be determined in the field after pre-marking by the various utilities affected.
B. It should be understood that the various utilities are indicated on the Plans to show only the approximate location and must be verified in the field by the Contractor. The various utility agencies will cooperate with the Contractor to endeavor to familiarize him with all known underground utility obstructions, but this will not relieve the Contractor from full responsibility in anticipating and locating their actual existence.
No extra payment will be allowed for the removal, replacement, repair, or possible increased cost caused by inadvertent or planned interception and breaking of underground obstructions which may exist.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used
END OF SECTION
8.k
August 12, 2024
Packet Pg. 311
Technical Specifications Highlands Park Path Project C1811 TP - 49
SECTION 021100 SITE PREPARATION
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Remove and dispose of surface debris.
B. Prior to any excavation, obtain permission from the City, PG&E and/or any other affected utility providers to penetrate or excavate surfaces along the project route.
Remove and dispose of paving, curbs, gutters, fences, posts, or structures indicated on the drawings.
C. Soil stabilization.
1.2 RELATED SECTIONS
A. Section 013100 Coordination
B. Section 015600 Protection of Existing Facilities
1.3 REGULATORY REQUIREMENTS
A. Conform to applicable codes and all local, state and federal regulations for disposal of debris and use of herbicides. Burning of debris, lumber or scrap will not be permitted.
PART 2 PRODUCTS
2.1 MATERIALS
A. Not used.
PART 3 EXECUTION
3.1 PREPARATION
A. Sawcut paving, curbs gutters and other structures between portion to remain and portion to be removed.
3.2 OTHER IMPROVEMENTS
A. Protect trees, plant growth, and features designated to remain, as final landscaping.
B. Protect bench marks and existing structures which are to remain from damage or displacement.
8.k
August 12, 2024
Packet Pg. 312
Technical Specifications Highlands Park Path Project C1811 TP - 50
3.3 REMOVAL
A. Remove debris, rock, soil and extracted plant life from site. Dispose of materials at approved facilities.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 313
Technical Specifications Highlands Park Path Project C1811 TP - 51
SECTION 024100 - DEMOLITION
PART 1. GENERAL
1.1 SUMMARY
A. Section Includes:
Demolition & Permits
Removal and Disposal
Recycling & Salvaging
1.2 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Demolition:
1. Basis of Measurement: Not a measured item, unless specified otherwise on the Drawings.
2. Basis of Payment: The cost of any works that relevant to demolition shall be considered as included in the contract prices for the various contract items of work involved, and no additional compensation shall be allowed therefor.
1.3 REFERENCES & RELATED WORK SPECIFIED ELSWHERE
A. Bay Area Air Quality Management District (BAAQMD) http://www.baaqmd.gov/
1. Regulation 11 (Hazardous Pollutants) and Rule 2 (Asbestos Demolition, Renovation, and Manufacturing).
B. CALGreen Construction Waste Management Requirements
1. http://www.calrecycle.ca.gov/LGCentral/Library/CandDModel/Instruction/CALGreen Tbl.pdf
C. California Occupational Safety and Health (Cal/OSHA)
1. General Requirements
D. Commercial
1. USA Underground Service Alert
E. Division 1
1. General Requirements
1.4 SUBMITTALS
A. Section 013300 - Submittal Procedures: Requirements for submittals.
8.k
August 12, 2024
Packet Pg. 314
Technical Specifications Highlands Park Path Project C1811 TP - 52
B. The Contractor shall submit to the City a haul route for approval, prior to commencing any work. Truck traffic movement is limited between the hours of 9am to 3pm, unless approved by the Project Manager.
C. Before disposing of any demolished material prior to any work
1. Submit a written agreement from the property owner
a. For the use of the property
b. absolving the City from responsibility in connection with the property.
2. Obtain authorization to start
D. Before Contract acceptance, submit a document signed by the owner of the material disposal site stating that the Contractor has complied with the Contractor-Owner agreement.
E. Demolition Schedule: The Contractor shall submit a complete coordination schedule for demolition work including shut-off and continuation of utility services prior to start of the work. The schedule shall indicate proposed methods and operations of facility demolition, and provide a detailed sequence of demolition and removal work to ensure uninterrupted operation of occupied areas.
F. All affected private properties will receive door hanger notices as specified in Section 015050 Mobilization prior to any utility shutoffs or frontage demolition and improvements.
1.5 JOB SITE CONDITIONS
A. The Contractor shall visit the site and inspect the existing facilities. The City assumes no responsibility for actual condition of facilities to be demolished.
B. Contractor shall use all means necessary to prevent the spread of dust during performance of the work. Thoroughly moisten all surfaces as required to prevent the generation of dust.
No washing of streets is permitted.
C. All liquid, and slurry generated during pavement sawcutting shall be collected and removed from the site. These liquids shall not be washed into the area storm drainage system.
D. Contractor shall remove hazardous materials as described per the Project Asbestos and Lead Inspection Report.
E. The Contractor prior to the commencement of the demolition or renovation, thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II nonfriable Asbestos Containing Materials (ACM).
F. The Contractor must also provide the Environmental Protection Agency (EPA) with a 10 working day advance notice for any disturbance of Regulated Asbestos-Containing Material (RACM) greater than 160 square feet or 260 lineal feet, and as specified in Code of Federal Regulations (CFR) Title 40, Chapter I, Subchapter C, Part 61, Subpart M, Section 61.145.
8.k
August 12, 2024
Packet Pg. 315
Technical Specifications Highlands Park Path Project C1811 TP - 53
PART 2. PRODUCTS (NOT USED)
PART 3. EXECUTION
1.6 INSTALLATION
A. Notify anyone to be affected by demolition and construction activities including but not limited to: all schools, residences, businesses, garbage collection, utility companies (PG&E-Gas Distribution, PG&E Gas Transmission, PG&E-Electric, AT&T, Comcast, etc.), the Owner, etc. at least ten (10) working days prior to commencing the work of this section.
B. Site Inspection:
1. Prior to all work of this section, carefully inspect the site and all objects designated to be removed and to be preserved.
2. Locate all existing active utility lines traversing the site and determine the requirements for their removal and/or protection.
C. Clarification:
1. The Drawings do not purport to show all objects existing on the site.
2. Before commencing the work of this section, verify with the Owner all objects to be removed and all objects to be preserved
D. Scheduling:
1. Schedule all work in a careful manner with all necessary consideration for neighbors, operation of the existing facilities, and the public.
2. Avoid interference with the use of, and passage to and from, residences and adjacent facilities.
E. Protection of Utilities: Preserve in operating condition all active utilities traversing the site and designated to remain.
1.7 WATER POLLUTION CONTROL
A. Water sprinkling, temporary enclosures, chutes and other suitable methods shall be used to limit dust and dirt rising and scattering in the air. The Contractor shall comply with all government regulations pertaining to environmental protection.
B. The Contractor shall use equipment that will generate the least amount of dust. The Contractor shall provide dust control at all times including Saturdays, Sundays, and holidays unless directed otherwise by the Project Manager.
C. Whenever the Contractor, in the opinion of the Project Manager, is negligent in controlling dust, the Project Manager may direct attention to the existence of a dust hazard and instruct the Contractor to immediately alleviate the dust hazard. The Contractor shall be responsible for any damage cause by dust generated as a result of the Contractors operations.
8.k
August 12, 2024
Packet Pg. 316
Technical Specifications Highlands Park Path Project C1811 TP - 54
D. The Contractor shall have a commercial standard street vacuum/sweeper operational and in operation during each working day. The street vacuum/sweeper shall be able to pick up sand, gravel, dust, and debris, and other things, shall minimize dust generation, and shall also be available during the day and shall sweep as outlined below and as directed by the Project Manager.
E. If the Contractor is performing work that generates dust and debris then during the day (including weekends and holidays) the sweeper shall sweep the project area (full length, width, and all lanes) twice a day sometime between 9:00a.m. and 11:00a.m. and also between 2:00p.m. and 4:00p.m. Hardscape surfaces (including pavers, sidewalks, and areas inaccessible by a mechanical sweeper) shall have dirt, dust, and debris removed by hand sweeping. If the Contractor fails to fulfill the responsibilities of this section, the City will perform or contract with others to perform the work and all costs incurred to the City shall be withheld from future payments to the Contractor.
F. The Contractor shall clean the sidewalk and gutter as many times as needed to make sure the sidewalk and gutter are out of dirt, debris and small rocks at all times. The Contractor shall be prepared to sweep surfaces immediately at the request of the Project Manager, should the Project Manager deem it necessary for public safety and to avoid damage to properties. If streets are not satisfactorily cleaned within 12 hours from verbal or written notice by City personnel, the City will hire an independent sweeping company and deduct the cost for such work from payments due to the Contractor.
G. Water shall not be used in a manner that creates hazardous or objectionable conditions such as ice, flooding, or pollution.
H. The site shall be kept neat and orderly during the demolition to the maximum extent practical.
I. Public right-of-way and private property shall be kept free of debris at all times.
J. Stockpiles of demolished items or materials shall be removed from the site on a daily basis or stored in waste containers which shall be emptied on a weekly basis or as conditions require in order to manage the accumulation of waste.
K. Accumulations of flammable materials shall not be permitted.
1.8 PROTECTION
A. Safe passage of persons around area of demolition shall be provided in accordance with all safety and regulatory requirements. Operations shall be conducted to prevent damage to adjacent buildings, structures, other facilities, people and property. Safe passage provided by Contractor will be ADA complaint.
B. Interior and exterior shoring, bracing, or supports shall be provided to prevent movement, settlement or collapse of structures to be demolished and to adjacent facilities to remain.
8.k
August 12, 2024
Packet Pg. 317
Technical Specifications Highlands Park Path Project C1811 TP - 55
C. Existing landscaping materials, structures, and appurtenances which are not to be demolished shall be protected and maintained as necessary.
D. The Contractor shall repair any landscaping and irrigation system removed or damaged as a result of the Contractor's operation or where proposed improvements are a conflict.
Active irrigation lines necessary for landscaping shall be relocated and made operational within 48 hours of their removal.
E. The Contractor shall protect and maintain conduits, drains, sewers, pipes and wires that are not to be demolished.
F. Use all means necessary to protect existing objects designated to remain or to be preserved must remain operational during installation of the replacement pipeline. In the event of damage, immediately notify the Owner and make all repairs and replacements necessary for approval by the Owner at no additional cost to the Owner.
1.9 SURFACE DEMOLITION
A. All asphalt concrete and all Portland cement concrete curbs, gutters, sidewalks, access ramps and driveways shall be saw-cut at the nearest scoreline or deep joint and removed entirely to the saw-cut limits.
B. Where adjacent pavement or concrete is broken or damaged sufficiently to prohibit a sound replacement the entire damaged section shall be removed to the limits determined by the Project Manager.
C. Asphalt concrete, sidewalk, concrete curb, and gutter materials to be demolished shall be broken up and removed from the site by the Contractor at no additional cost to the City.
D. Where shown on the Drawings, the Contractor shall remove required pavement section including base material. Subsoil removal is also included where required to achieve design subgrade.
1.10 DEMOLITION BELOW THE SURFACE
A. Existing structures, pavement slabs and structural sections to be abandoned shall be demolished to an elevation three feet below finished grade. Their bottoms (if any remain) shall be broken thoroughly to prevent entrapment of water and all voids backfilled with suitable backfill
B. Demolition areas and voids resulting from demolition of structures below the surface shall be completely filled.
C. All fill, compaction, and holes created by demolition work shall be backfilled with imported clean fill. Lay fill down in layers not exceeding 6 thickness and compact per the earthwork specifications. Grade the site to drain to the nearest storm drainage system without any low points.
8.k
August 12, 2024
Packet Pg. 318
Technical Specifications Highlands Park Path Project C1811 TP - 56
D. All fill and compaction surfaces shall be graded to meet adjacent contours and to provide flow to surface drainage structures, or as shown on the Drawings.
E. Pipes to be demolished that require no future connection shall be removed to the extent required, sealed and capped. Pipe sections shall be removed by removing a complete pipe section to an existing joint, or other adequate means which results in a clean joint.
F. The Contractor shall demolish or dismantle and remove all items that are noted for demolition and removal in the Contract Documents and that will interfere with the planned construction, or as otherwise directed by the Project Manager.
G. The Contractor shall demolish or dismantle and remove all abandoned conduits or structures that are encountered during the prosecution of the work and which interfere with the construction of the work upon the approval of the Project Manager.
1.11 REMOVAL OF EXISTING WATER AND SEWER SERVICES
A. GENERAL ABANDONMENT:
1. When salvage materials are shown on the Drawings; salvage and arrange the existing facilities (i.e., meters, manhole covers, manhole frames, etc.) to be dropped off at the City's Corporation Yard by prior arrangement.
2. Properly remove or abandon in place unused existing City utility service lines discovered that were left in place by others.
3. Contact utility companies for removal, abandonment, adjustment or relocation of their facilities.
4. Contractor is responsible for verifying the location of any existing utilities.
5. Abandonment of pipes will include filling pipe with slurry as specified in Section 19-
3.02G Controlled Low-Strength Material of the State Standard Specification and capping the pipes at the ends.
1.12 DISPOSAL OF DEMOLISHED MATERIALS
A. Demolition and removal of debris shall be conducted to ensure minimum interference with roads, streets, walks and other adjacent occupied or used facilities which shall not be closed or obstructed without permission from the City. Alternate routes shall be provided to circumvent closed or obstructed traffic ways.
B. The Contractor shall comply with all pertinent regulations of Cal/OSHA and local codes and practices.
C. All existing materials that are designated to be salvaged shall be removed, cleaned and hauled to the City Corporation Yard, unloaded and stockpiled unless otherwise directed by the Project Manager.
D. Site debris, rubbish and other materials resulting from demolition operations shall become the property of the Contractor and shall be removed by the Contractor at the Contractor's expense. The proper and legal disposal of demolished materials shall be the responsibility
8.k
August 12, 2024
Packet Pg. 319
Technical Specifications Highlands Park Path Project C1811 TP - 57
of the Contractor. All disposal sites and recycling facilities shall be approved by the City prior to initiation of the Work.
1. Concrete debris shall be transported to a recycler of such materials.
2. Hazardous materials shall be handled and disposed of in accordance with all applicable laws, codes, and regulations.
1.13 PATCHING AND REPAIRING
A. The Contractor shall provide patching, replacing, repairing and refinishing of damaged areas or damaged adjacent facilities involved in the demolition.
B. New concrete shall match the existing adjacent surfaces, in kind, or of better quality, to the satisfaction of the Project Manager, at no cost to the City or to the owners of the facilities.
1.14 CLEAN UP
A. During and upon completion of work the Contractor shall promptly remove unused tools and equipment, surplus materials, rubbish, debris and dust and shall leave areas affected by work in a clean, approved condition.
B. The Contractor shall clean adjacent structures and facilities of dust, dirt and debris caused by demolition, as directed by the Project Manager, and return adjacent areas to condition existing prior to start of work.
C. The Contractor shall clean and sweep daily all street and roads affected by its operation.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 320
Technical Specifications Highlands Park Path Project C1811 TP - 58
SECTION 310513 CLEARING & GRUBBING, EXCAVATION, AND EARTHWORK PART 1. GENERAL
1.1 SUMMARY
A. Section Includes:
1. Clearing and Grubbing
2. Excavation
3. Earthwork
4. Grading and Compaction
5. Subsoil materials Import Fill and Select Fill
6. Topsoil materials.
B. Related Sections:
1. Project Geotechnical report; bore hole locations and findings of subsurface materials if applicable.
1.2 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
B. ASTM International:
1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3).
2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3).
3. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System).
C. California Building Code Appendix J - Grading
D. State Standard Specifications:
1. Section 14 Environmental Stewardship
2. Section 17 - General
3. Section 19 Earthwork
1.3 SUBMITTALS
A. Section 013300 - Submittal Procedures: Requirements for submittals.
8.k
August 12, 2024
Packet Pg. 321
Technical Specifications Highlands Park Path Project C1811 TP - 59
B. Samples: Submit results of the soil samples by a certified testing laboratory prior to importing onto the site for approval by the Project Manager.
C. Materials Source: Submit name of imported materials source.
D. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
1.4 QUALITY ASSURANCE
A. Furnish each subsoil material from single source throughout the Work.
PART 2. PRODUCTS
2.1 SUSTAINABILITY CHARACTERISTICS
A. Materials and Resources Characteristics:
1. Regional Materials: Furnish materials extracted, processed, and manufactured within 250
miles of jobsite.
2.2 SUBSOIL MATERIALS
A. Select Fill Material:
1. Subsoil material is on-site excavated material.
2. Graded
3. Non-hazardous
4. Free of lumps larger than three (3) inches, rocks larger than two (2) inches, organic matter, frozen or other deleterious materials and debris.
5. Selected material encountered in excavation within the right of way shall be used for finishing the top portion of the roadbed, constructing shoulders, structure backfill; as shown on the Drawings; as specified in the Special Provisions, or as directed by the Project Manager.
B. Import Fill Material:
1. Subsoil material imported from sources outside the project site meeting.
2. Graded
3. Non-hazardous
4. Free of lumps larger than three (3) inches, rocks larger than two (2) inches, organic matter, frozen or other deleterious materials and debris.
5. Unless otherwise specified, the Contractor shall obtain from the owners the right to procure material, pay all royalties and other charges involved, and bear all expense of developing the sources, including rights of way for hauling.
6. No import fill material shall be delivered to the site until approved by the Project Manager. Approval of import fill material shall be based on the testing of representative samples submitted by the contractor meeting the appurtenant
8.k
August 12, 2024
Packet Pg. 322
Technical Specifications Highlands Park Path Project C1811 TP - 60
Geotechnical Report and approved by the Project Manager. Such representative samples shall be submitted to the Project Manager not less than 15 days prior to commencing the work.
7. Imported fill, delivered to the site, that significantly differs from the submitted samples shall be subject to rejection. Rejected materials shall be removed from the site at the Contractor's expense
8. Approval of a particular import fill material shall constitute approval of only that portion of the proposed borrow source represented by the submitted sample.
9. Except as otherwise permitted, borrow pits and other excavation areas shall be excavated in such manner as will afford adequate drainage. Overburden and other spoil material shall be transported to designated spoil areas or otherwise disposed of as directed, local borrow pits shall be neatly trimmed and left in such shape as will facilitate accurate measurement after the excavation is completed.
2.3 FILL MATERIALS:
A. Fill material shall conform to the following as determined by ASTM C 117 and ASTM C 136:
1. Maximum particle size 3 inches
2. Percent passing 1-inch sieve 90-100 percent
3. Percent passing No. 200 sieve less than 20 percent
B. Imported non-expansive fill shall consist of a well-graded, slightly cohesive soil with relatively impervious characteristics when compacted.
C. Plasticity Index for acceptable import fill materials shall be a maximum of 15 when determined by the procedure set forth in ASTM D 4318.
D. The liquid limit shall not exceed 40 percent as de termined by the procedures set forth in ASTM D 4318.
E. Import fill material shall have an R-value of 25 o r greater as determined by ASTM D 2844.
2.4 TOPSOIL MATERIALS
A. Topsoil shall be imported top soil.
B. Topsoil excavated within the limits of the project, as approved by the Engineer, will be considered as a material only for the purpose of backfilling areas to be planted.
2.5 SOURCE QUALITY CONTROL
A. Testing and Analysis of Subsoil and Topsoil Materials: Perform in accordance with ASTM D698, ASTM D1557, and AASHTO T180.
B. When tests indicate materials do not meet specified requirements, provide alternate materials and retest.
8.k
August 12, 2024
Packet Pg. 323
Technical Specifications Highlands Park Path Project C1811 TP - 61
C. Furnish materials of each type from same source throughout the Work.
PART 3. EXECUTION
3.1 PREPARATION
A. Call USA not less than two (2) working days before performing Work that can be marked by USA in a timely manner.
B. Request underground utilities to be located and marked within and surrounding construction areas.
C. Identify required lines, levels, contours and datum.
D. Notify utility companies to remove and relocate utilities where shown on the Drawings.
E. Protect utilities indicated to remain from damage.
F. Protect plant life, lawns, and other features remaining as portion of final landscaping.
G. Protect benchmarks or monuments, survey control points, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.
H. The ground shall be prepared to received select fill by removing vegetation, topsoil and other unsuitable materials, scarifying the ground to provide a bond with the fill material, and compacting the fill at optimum moisture content.
3.2 CLEARING AND GRUBBING
A. Clearing and grubbing shall be per Section 17-2 Clearing and Grubbing of the State Standard Specifications.
B. Clear and grub before performing earthwork in an area.
C. Do not injure standing trees, plants, and improvements shown to be protected.
D. Clearing and grubbing shall consist of removing all objectionable material from within the limits of the project. The limits of clearing and grubbing shall be of sufficient area and depth to complete the work shown on the Drawings or as described herein in.
E. No burning of materials is allowed.
F. The site shall be stripped and cleared of all vegetation, debris, and organic-laden top soil as required by the Engineer.
G. Trees within the limits of work including any traffic control work beyond the limits of work and within the area of influence shall be evaluated by the City or; a City approved certified
8.k
August 12, 2024
Packet Pg. 324
Technical Specifications Highlands Park Path Project C1811 TP - 62
Arborist to assess protection measures. No trees will be removed until they have been tagged, numbered and a written release for the tree has been issued by the City.
H. Tree stumps which are designated to be removed, shall be excavated and removed 30 down to remove the tree trunk, roots, and backfill with fill material and compact as required in this section, unless specified otherwise on the Drawings.
I. Grub all construction areas to a depth of at least 0.50 feet, necessary to remove all existing tree stumps, roots, buried logs and other objectionable material, unless noted otherwise on the Plans. In embankment areas where the grading plane is 2 feet or more above original ground, cut off trees, stumps, and roots not more than 1 foot above original ground, except, remove trees, stumps, and roots completely where work includes any of the following:
1. Structure construction
2. Pile construction
3. Subdrainage trench excavation
4. Removal of unsuitable material
5. Cutting into slopes of original hillsides, old or new fill
6. Utility line construction
3.3 EXCAVATION
J. Work under this section shall consist of performing all operations necessary to excavate earth and rock, regardless of character and subsurface conditions, from the roadway prism or adjacent thereto, to excavate all materials, of whatever nature, necessary for the construction of foundations for structures and other facilities: to excavate drainage and irrigation ditches; to excavate drainage channels; to excavate selected material and import material for use as specified; to construct embankments including the placing of selected fill or import fill material in connection therewith as specified; to place backfill for structures, and other facilities; to backfill trenches and depressions resulting from the removal of obstructions; to backfill holes, pits and other depressions; to remove and replace unsuitable material; to excavate and grade road approaches, driveways, sidewalks, path, curb ramps, curb and gutters, utility pipes, walls, and connections; to construct protection dikes; to remove unstable material, slide material which has come into the graded area, and material which has slipped from embankments; all as shown on the plans and as specified in these Specifications and the Special Provisions and as directed by the Project Manager; and furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work that may be required to construct and maintain the project facilities, except excavation, trenching and backfilling for pipe, culverts, utility systems, and other subsurface pipes.
K. Excavate subsoil and topsoil from areas designated. Strip topsoil to full depth of topsoil in designated areas.
L. Stockpile excavated material meeting requirements for subsoil fill materials and topsoil materials approved by the Project Manager.
8.k
August 12, 2024
Packet Pg. 325
Technical Specifications Highlands Park Path Project C1811 TP - 63
M. If practicable and unless processing of material is required, haul selected material directly from the excavation to its final position in the roadway prism and compact it in place.
N. Excavate to the described or authorized grade. If the Contractor over excavates, backfill with an authorized material and compact it at the Contractors own expense.
O. Do not excavate wet subsoil unless directed by the Project Manager.
P. The temporary slope of cut surfaces shall be no steeper than is safe for the intended use, and shall not be more than one-unit vertical in two units horizontal (50-percent slope) unless approved by the Project Manager or appurtenant geotechnical report.
Q. Archaeological Resources: Contractor shall conform to Section 14 Environmental Stewardship of the State Standard Specifications. If archaeological resources are discovered within or near construction limits, do not disturb the resources and immediately:
1. Stop all work within a 60-foot radius of the discovery
2. Secure the area
3. Notify the Project Manager.
R. City will investigate the discovery. Do not move archaeological resources or take them from the job site. Do not resume work within the radius of discovery until authorized.
S. Environmentally Sensitive Areas (ESA): If an ESA is shown on the Drawings, the boundaries are approximate. Do not enter an ESA unless authorized. If an ESA is breached, immediately:
1. Stop all the work within 60 feet of the ESA boundary
2. Secure the area
3. Notify the Project Manager
If an ESA is damaged, the Project Manager determines the necessary remediation and the party to perform the work. The City deducts the cost for this work from the Contractor bid price.
T. Notify the Project Manager when buried man-made objects are encountered in an excavation as part of the excavation work and wait for direction from Project Manager unless shown on the plans for removal. All surplus material shall be disposed offsite.
U. Remove excess excavated materials, subsoil and topsoil not intended for reuse, from site.
V. Remove excavated materials not meeting requirements for subsoil materials and topsoil materials from site.
W. When hauling is done over highways or City streets, and when directed by the Project Manager the loads shall be trimmed and all material removed from shelf areas of vehicles in order to eliminate spilling of material. If directed by the Project Manager, the loads shall be watered down or covered after trimming to eliminate dust.
X. Excavation shall include the satisfactory removal and disposition of all materials not classified as rock excavation.
8.k
August 12, 2024
Packet Pg. 326
Technical Specifications Highlands Park Path Project C1811 TP - 64
Y. Earth and rock, regardless of character and subsurface conditions, shall be excavated to the lines and grades as established by the plans.
Z. All existing materials that are designated to be salvaged shall be removed, cleaned and hauled to the City Corporation Yard, unloaded and stockpiled, by the Contractor unless otherwise directed by the Project Manager.
AA. Existing pipes to be abandoned shall be filled with slurry, minimum of thirty (30) feet from either ends of the pipe and capped with concrete at the ends.
BB. Existing structures, pavement slabs, and structural sections to be abandoned shall be demolished to an elevation three (3) feet below finished grade, unless specified otherwise on the Drawings. The bottom (if any remains) shall be broken thoroughly to prevent entrapment of water and all voids backfilled with suitable backfill.
CC. Operations shall be conducted in such a manner that existing street, facilities, utilities, railroad tracks and other non-street facilities which are to remain in place will not be damaged.
DD. The Contractor, at his expense, shall furnish and install-sheet piling, cribbing, bulkheads, shores or whatever means may be necessary to adequately support material carrying such facilities, or to support the facilities themselves, and shall maintain such supports until they are no longer needed. Temporary pavements, facilities, utilities and installations shall also be protected until they are no longer required. When temporary supports and other protective means are no longer required, they shall become the property of the Contractor and shall be removed and disposed of from the job site
EE. Prior to placing import fill material, all areas to receive fill shall be scarified and compacted.
Unless otherwise stated in the appurtenant Geotechnical report, the area shall be scarified to a minimum of eight (8) inches, material shall be moisture conditioned by wetting or drying to optimum moisture content, and compacted.
3.4 ROCK EXCAVATION
A. Rock excavation shall include excavating, grading, and disposing of materials classified as rock and shall include the satisfactory removal and disposition of rock 1/2 cubic yard or more in volume.
B. No blasting is allowed.
3.5 GRADING
A. Grading shall consist of placing fill materials on site to contours and elevations with select fill or import fill materials.
B. Place fill material in continuous layers of maximum lifts of 8 inches (0.67 feet) and compact in accordance with schedule shown in this section, unless otherwise shown on the appurtenant Geotechnical Report.
8.k
August 12, 2024
Packet Pg. 327
Technical Specifications Highlands Park Path Project C1811 TP - 65
C. Maintain optimum moisture content of fill materials to attain required compaction density.
D. Construct slopes to the lines and grades shown on the Drawings.
E. Slope grade away from the building minimum 2% slope for a minimum distance of 10 feet, unless noted otherwise.
F. Make grade changes gradual. Blend slopes into level areas.
G. Round the tops of excavation slopes and ends of excavation.
H. Maintain completed slopes. Repair any slopes damaged by erosion.
I. Repair or replace items indicated to remain that are damaged by excavation or filling.
J. Identify any site low points which need positive drainage and make adjustments with approval from Project Manager prior to pouring concrete.
K. Protection of existing slopes using erosion control measures as required in Section 015723 Storm Water Pollution Prevention Plan.
3.6 TOLERANCES
A. Section 01 45 16 Quality Control: Tolerances.
B. Immediately before placing subsequent layers of material, prepare the grading plane such that the grading plane:
1. Does not vary more than 0.05 foot above or below the grade established by the Engineer where Hot Mix Asphalt (HMA) or aggregate base are to be placed.
2. Does not extend above the grade established by the Engineer where concrete base or pavement is to be placed.
3. Beneath structural approach slabs or the thickened portion of sleeper slabs do not extend above the grade established by the Engineer.
4. At any point is within 0.05 foot above the grade established by the Engineer if the material to be placed on the grading plane is paid by the cubic yard.
3.7 COMPACTION
A. Relative compaction specifications apply to material whether in an excavation or an embankment.
B. The moisture content of material to be compacted to at least 95 percent must be such that the specified relative compaction is attained.
C. Compact earthwork to a relative compaction of at least 95 percent for at least a depth of:
1. 0.5 foot below the grading plane for the width between the outer edges of shoulders
2. 2.5 feet below the finished grade for the width of the traveled way including any parking lots or other vehicular areas; to extend plus two (2) feet on each side.
8.k
August 12, 2024
Packet Pg. 328
Technical Specifications Highlands Park Path Project C1811 TP - 66
D. All fill material shall be compacted to at least 90 percent of maximum density as determined by ASTM D1557, Modified Proctor, beyond the depth specified above in 3.7.C.
3.8 STOCKPILING
A. Stockpile materials on site will not be permitted unless authorized by Project Manager.
3.9 PROTECTION
A. Prevent displacement or loose soil from falling into excavation; maintain soil stability.
B. Protect bottom of excavations and soil adjacent to and beneath foundation from freezing.
C. Protect structures, utilities, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth operations.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 329
Technical Specifications Highlands Park Path Project C1811 TP - 67
SECTION 321123 AGGREGATE BASE COURSES
PART 1. GENERAL
1.1 SUMMARY
A. Section Includes:
1. Class 2 Aggregate Base course.
B. Related Sections:
1. Section 321216 Paving Systems
2. Section 321313 - Concrete Improvements.
1.2 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO M288 - Standard Specification for Geotextile Specification for Highway Applications.
B. Caltrans Standard Specifications:
1. Section 26 Aggregate Base.
C. CalRecycle
1. http://www.calrecycle.ca.gov/ConDemo/Aggregate/
1.3 SUBMITTALS
A. Section 013300 - Submittal Procedures: Requirements for submittals.
B. Samples: Submit, in air-tight containers, 5 lbs sample of each type of aggregate fill to testing laboratory or as required by the City.
C. Submit aggregate base gradation, R-value requirements, and sand equivalent requirements as specified in this section.
D. Aggregate samples must not be treated with lime, cement, or chemicals before testing for durability index.
E. Aggregate from untreated reclaimed processed asphalt concrete, Portland cement concrete, lean concrete base or cement-treated base is not considered treated.
8.k
August 12, 2024
Packet Pg. 330
Technical Specifications Highlands Park Path Project C1811 TP - 68
F. If the aggregate gradation test results, sand equivalent test results, or both do not comply with the Contract compliance requirements, remove the aggregate base or request a payment deduction. If the payment deduction request is authorized, $2.00/cu yd is deducted.
G. Materials Source: Submit name of aggregate materials suppliers.
H. Manufacturer's Certificate: Certify products meet or exceed specified requirements.
I. Supplier shall submit certification data that aggregate base meets the requirements per Caltrans Testing Methods.
1.4 SUSTAINABLE DESIGN SUBMITTALS
A. Manufacturer's Certificate: Certify products meet or exceed specified sustainable design requirements.
1. Materials Resources Certificates:
a. Certify source and origin for salvaged and reused products. b. Certify recycled material content for recycled content products. c. Certify source for regional materials and distance from jobsite.
1.5 QUALITY ASSURANCE
A. Furnish each aggregate material from single source throughout the Work.
B. Perform Work according to City Standards.
PART 2. PRODUCTS
2.1 SUSTAINABILITY CHARACTERISTICS
A. Materials and Resources Characteristics:
1. Recycled Content Materials: Furnish materials with maximum available recycled content.
2. Regional Materials: Furnish materials extracted, processed, and manufactured within 250 miles of jobsite.
2.2 AGGREGATE MATERIALS
A. Aggregate must be clean and consist of any combination of the following:
1. Broken Stone
2. Crushed Gravel
8.k
August 12, 2024
Packet Pg. 331
Technical Specifications Highlands Park Path Project C1811 TP - 69
3. Natural rough-surfaced gravel
4. Sand
5. Processed reclaimed asphalt concrete, Portland cement concrete, lean concrete base, or cement-treated base.
B. Quality: Aggregate base furnished for the base material shall be free from vegetable matter and other deleterious substances, and shall be of such nature that it can be compacted readily under watering and rolling to form a firm stable base.
C. Maximum aggregate size shall be 3/4-inch maximum aggregate gradation unless specified otherwise.
D. Class 2 Aggregate Base: ASTM D2940; graded type. Conform to Section 26 of the Caltrans Standard Specifications.
PART 3. EXECUTION
3.1 EXAMINATION
A. Verify compacted subgrade is moisture conditioned and ready to support paving and imposed loads.
1. Proof roll subgrade with minimum two perpendicular passes to identify soft spots.
2. Remove soft subgrade and replace with compacted fill unless specified otherwise in the Project Geotechnical Report or as ordered by the Project Manager.
B. Immediately before spreading aggregate base, the subgrade must comply with the specified compaction and elevation tolerance for the material involved and be free from loose or extraneous materials.
C. Contractor may use aggregate base to fill areas of the subgrade that are lower than the proposed grade.
3.2 PREPARATION
A. Correct irregularities in subgrade gradient and elevation by scarifying, moisture conditioning, reshaping, and re-compacting.
B. Do not place fill on soft, muddy, or frozen surfaces.
3.3 AGGREGATE PLACEMENT
A. Spread and shape the aggregate base to such thickness that after watering and compacting, the completed aggregate base is within the tolerances specified below in Section 3.5.
B. Avoid material segregation. Segregated materials shall be re-mixed until uniform.
8.k
August 12, 2024
Packet Pg. 332
Technical Specifications Highlands Park Path Project C1811 TP - 70
C. Aggregate base must be free from pockets of coarse or fine material.
D. If the aggregate base thickness shown is 0.50 foot or less, spread and compact the aggregate base in one layer. If the thickness shown is more than 0.50 foot, spread and compact the aggregate base in at least 2 approximately equal layers in thickness. The compacted thickness of any one later must not exceed 0.50 foot.
E. At locations inaccessible to spreading equipment, spread and compact aggregate base by any means that will attain the specified requirements; by hand compaction if needed.
F. Apply water to moisture condition the aggregate base as needed for optimum moisture content for compaction.
G. Compact each aggregate base layer to at least 95 percent relative compaction unless otherwise noted elsewhere.
H. Level and contour surfaces to elevations, profiles, and gradients indicated.
I. Maintain optimum moisture content of fill materials to attain specified compaction density.
J. Correct areas of aggregate base that do not comply with the described thickness.
3.4 TOLERANCES
A. Section 014516 - Quality Control: Tolerances.
B. Maximum Variation from Flat Surface: 1/4 inch measured with 10-foot straight edge.
C. Maximum Variation from Thickness: 1/4-inch.
D. Maximum Variation from Elevation: 1/4-inch.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 333
Technical Specifications Highlands Park Path Project C1811 TP - 71
SECTION 321216 ASPHALT PAVING AND MISCELLANEOUS PAVING ITEMS PART 1 GENERAL
1.1 DESCRIPTION
A. Work included: Work covered in this section consists of performing all operations necessary for producing and placing hot mix asphalt (HMA) by mixing aggregate and asphalt binder at a mixing plant and spreading and compacting the HMA mixture.
B. Hot mix asphalt overlay and deep lifts (at dig outs) shall be provided where shown on the plans and as marked in the field.
C. Section includes:
1. Quality Control Plan.
2. Quality Control Testing.
3. Acceptance Testing.
4. Asphalt Binder and Tack Coat.
5. Aggregate Materials.
6. Hot Mix Asphalt.
7. Utility Cover Adjustments
D. Paving shall comply with the current State Standard Specifications and Standard Plans. HMA shall be provided in accordance with the Standard HMA construction process and conform to the latest Caltrans Section 39 of the Standard Specifications and as detailed in this specification.
1.2 RELATED SECTIONS
A. Section 321723 Traffic Striping, Pavement Markers, Pavement Markings & Signage
1.3 REFERENCES
A. State Standard Specification:
1. Section 39 Asphalt Concrete.
2. Section 92 Asphalt Binder.
3. Section 94 Asphaltic Emulsions
4. Section 96 Geosynthetics
B. American Association of State Highway and Transportation Officials:
(AASHTO)
5. AASHTO M17 - Standard Specification for Mineral Filler for Bituminous Paving Mixtures.
6. AASHTO M29 - Standard Specification for Fine Aggregate for Bituminous Paving Mixtures.
8.k
August 12, 2024
Packet Pg. 334
Technical Specifications Highlands Park Path Project C1811 TP - 72
7. AASHTO M140 - Standard Specification for Emulsified Asphalt.
8. AASHTO M208 - Standard Specification for Cationic Emulsified Asphalt.
9. AASHTO M288 - Standard Specification for Geotextile Specification for Highway Applications.
10. AASHTO M320 - Standard Specification for Performance-Graded Asphalt Binder.
11. AASHTO M324 - Standard Specification for Joint and Crack Sealant s, Hot Applied, for Concrete and Asphalt Pavements.
12. AASHTO MP1a - Standard Specification for Performance-Graded Asphalt Binder.
13. AASHTO T283-14 Standard Method of Test for Resistance of Compacted Asphalt Mixtures to Moisture-Induced Damage.
14. AASHTO T324 (Modified) -Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt (HMA).
C. Asphalt Institute:
15. AI MS-2 - Mix Design Methods for Asphalt Concrete and Other Hot- Mix Types.
16. AI MS-19 - Basic Asphalt Emulsion Manual.
17. AI SP-2 - Superpave Mix Design.
1.4 QUALITY CONTROL PLAN
A. Establish, implement and maintain a Quality Control Plan (QCP) to ensure materials and work comply with the specifications and the corrective actions required to control the quality of work. The QCP shall comply with these specifications and Section 39-2 Standard of the Caltrans Standard Specifications.
2. The Contractor shall submit a Quality Control (QC) plan for HMA.
E. The QC plan shall describe the organization and procedures for:
1. Controlling HMA quality characteristics
2. Taking samples, including sampling locations.
3. Establishing, implementing, and maintaining QC
4. Determining when corrective actions are needed.
5. Implementing corrective actions.
6. Using methods and materials for backfilling core locations.
F. The QC plan must address the elements affecting HMA Quality, including
1. Aggregates
2. Asphalt binder
3. Additives
4. Productions
5. Paving
8.k
August 12, 2024
Packet Pg. 335
Technical Specifications Highlands Park Path Project C1811 TP - 73
G. For CIP projects, the Contractor shall permit the Citys certified testing laboratory to take samples of the aggregate and asphalt emulsion used in the project at the Citys discretion. Gradation and sand equivalent tests may be run on the aggregate and residual asphalt tests on the emulsion. City will compare the test results with this Section and notify the Contractor if any test fails to meet specifications.
H. The Contractor shall furnish all tools and equi pment and employ sufficient trained personnel to operate all equipment and perform all handwork efficiently and skillfully.
1.5 SUBMITTALS
I. Section 013300 - Submittal Procedures: Requirements for submittals.
J. Job Mix Formula (JMF): Except for the Hot Mix Asphalt (HMA) to be used in miscellaneous areas (median island areas not including inside shoulders, island areas, sidewalk, gutters, ditches, over side drains and aprons at end of drainage structures) and dikes, submit the proposed JMF for Type A HMA.
K. The JMF must be submitted on the Contractor Job Mix Formula Proposal form along with:
1. Mix design documentation on Contractors Hot Mix Asphalt Design data form dated with 12 months of submittal.
2. Safety Data Sheets (SDS) for the following:
a. Asphalt Binder
b. Supplemental fine aggregate except fines from dust collectors c. Antistrip additives.
L. The Contractors Hot Mix Asphalt Design Data form must show documentation on aggregate quality.
M. Submit QC test results for Reclaimed Asphalt Pavement (RAP) gradation with the combined aggregate gradation within 2 business days of taking RAP samples during Type A HMA production.
N. Contractor shall submit a new JMF if there are changes to any of the following:
1. Target asphalt binder percentage greater than ±0.2 percent.
2. Asphalt binder supplier
3. Combined aggregate gradation
4. Aggregate sources
5. Liquid antistrip producer or dosage
6. Average binder content in a new processed RAP stockpile by more than ±2.0 percent from the average RAP binder content reported on Contractor Hot Mix Asphalt Design Data form.
7. Average maximum specific gravity in a new processed RAP stockpile by more than ±0.060 percent from the average maximum specific gravity value reported on Contractors Hot Mix Asphalt Design Data form.
8. Any material in the JMF.
8.k
August 12, 2024
Packet Pg. 336
Technical Specifications Highlands Park Path Project C1811 TP - 74
O. Submit a current asphalt concrete mix design from two separate sources (primary source and backup source) for asphalt concrete proposed to be used.
P. Contractor shall provide delivery tickets to the C ity at the time of delivery of each load of product, including asphalt concrete, tack coat, sealant, and paving reinforcement mat. Each delivery ticket shall include or be acco mpanied by appropriate batch information produced by the batching plant or factory of origin and information stating the mix or model number, total yield in tons, gallons, or square feet, and time, date, and location of delivery.
Q. Any asphalt concrete rejected by the Project Manager shall be deducted from the total quantity of asphalt concrete tonnage.
R. Contractor shall submit a reference plan for utility facilities adjustment prior to lowering any utility facilities.
S. Contractor shall submit a paving plan for longitudinal joints.
1.6 ENGINEERS ACCEPTANCE
A. In addition to the Quality Control Plan, the Contractor shall provide an independent quality control to perform independent sampling in accordance with Section 39-
1.05 and Section 39-2.03 of the Standard Specifications. City will provide acceptance testing. Sampling shall be performed under California Test 125.
Testing shall be performed as specified in this Section.
B. Start-up evaluation will be performed in accordance with Section 39-1.07 of the Standard Specifications. Sampling and testing shall occur at a minimum for the following:
1. Aggregate
2. Asphalt binder
3. RAP
4. HMA
C. Quality control sampling shall be performed by the Contractors Independent Assurance Tester in accordance with the following schedule: and quality acceptance testing shall be performed by the City
Quality Characteristic Test
Method
Minimum Sampling
and Testing
Frequency
Location
of
Sampling
Maximum
Reportin
g Time
Allowanc
eAggregate Gradation CT 202 1 per 750 tons Plant 24 hours Reclaimed Asphalt Pavement Gradation LP-9 Daily RAP System 24 hours Asphalt Binder Content CT 379 or
CT 382
1 per 750 tons Loose Mix
Behind Paver
24 hours
Percent of Maximum Theoretical Density CT 308 1 per 750 tons Loose Mix Behind Paver
24 hours
8.k
August 12, 2024
Packet Pg. 337
Technical Specifications Highlands Park Path Project C1811 TP - 75
Maximum Theoretical Density CT 309 Per CT 375 Loose Mix Behind Paver
24 hours
Aggregate moisture content at
continuous mixing plants and RAP
moisture content at continuous mixing
plants and batch mixing plants
CT 226 or
CT 370
2 per day during
production
Stock-piles or
Cold Feed
Belts
24 hours
Sand Equivalent (minimum) CT 217 1 per 750 tons Plant 24 hours HMA Moisture Content (maximum) CT 370 1 per 2,500 tons but not less than 1 per
paving day
Loose Mix
Behind Paver
24 hours
Stabilometer Value (minimum) No. 4 and
3/8 gradings 1/2 and 3/4 gradings CT 366
1 per 4,000 tons or 2
per five business
days, whichever is
greater
Loose Mix
Behind Paver
48 hours
Air Voids Content (%) CT 367
1 per 4,000 tons or 2
per five business
days, whichever is
greater
Loose Mix
Behind Paver
48 hours
Percent of crushed particles coarse
aggregate (% minimum) One fractured
face Two fractured faces Fine
aggregate (% minimum) (Passing No. 4
sieve and retained on No. 8 sieve)
CT 205 1 every 6,000 tons Plant 48 hours
Los Angeles Rattler (% maximum) Loss
at 100 revolutions Loss at 500 revolutions
CT 211 1 every 6,000 tons Plant 48 hours
Fine aggregate angularity (% minimum) AASHTO T-
304, Method
A
1 every 6,000 tons Plant 48 hours
Quality Characteristic Test Method Minimum Sampling
and Testing
Frequency
Location
of
Sampling
Maximum
Reportin
g Time
Allowanc
eFlat and elongated particle (%
maximum at 5:1)
ASTM D 4791 1 every 6,000 tons Plant 48 hours
Voids in mineral aggregate (%
minimum)
LP-2 1 every 6,000 tons Loose Mix
Behind Paver
48 hours
Voids filled with asphalt (%) LP-3 1 every 6,000 tons None Calculation 48 hours Dust proportion LP-4 1 every 6,000 tons None Calculation 48 hours Moisture Sensitivity CT-371 1 every 5,000 tons Loose Mix Behind Paver
NA
D. A minimum of one sample for Rice Specific Gravity shall be taken by Independent Assurance Tester each day at the plant during placement of HMA. The Rice Specific Gravity test shall be in accordance with ASTM D 2041. The results shall be submitted to the City within one working day of receiving them from the testing laboratory. Any change shall be noted and the Contractor shall take necessary measures to correct JMF or resubmit a new JMF for approval prior to continuing work.
E. In place density tests per CT 375 Nuclear Gage field test shall be performed during HMA operations by Independent Assurance Tester to meet compaction requirements per Standard Specifications. The frequency of testing shall be in
8.k
August 12, 2024
Packet Pg. 338
Technical Specifications Highlands Park Path Project C1811 TP - 76
accordance with CT 375.
F. Should any test specified in Paragraph 1.04 of this Section fail to meet density requirements, Independent Assurance Tester shall take density core samples every 500 feet of paved roadway per applicable sections within 39-2 of Standard Specifications (2015) to verify density results.
G. Tests results outside the specifications shall be subject to reduced payment in accordance with the table of Reduced Payment Factors for Percent of Maximum Theoretical Density in Section 39-2.01 A(4)(i)(ii) of Standard Specifications (2015).
H. Asphalt concrete (HMA) shall be compacted to a relative compaction of 95 percent.
1.7 PRODUCT HANDLING
A. All products described herein shall be handled in conformance to the applicable provisions of the Caltrans Standard Specifications.
1.8 PROJECT CONDITIONS
A. Weather Limitations:
1. No HMA shall be placed when weather conditions prevent the proper handling, finishing, or compaction of the mixtures.
2. Do not apply when underlying surface is muddy, frozen or wet.
3. Do not place tack coat when temperature is below 45º F.
4. Do not place hot mix asphalt when air temperature is below 45º F and surface temperature is below 50º F.
PART 2 PRODUCTS
2.1 TACK COAT
A. Tack Coat, Type SS-1H, conforming to the provisions of Sections 39 and 94 of the Caltrans Standard Specifications shall be used for digouts (pavement repairs) and over asphalt concrete planed surfaces.
2.2 ASPHALT BINDER
A. Asphalt binder for the Hot mix asphalt (HMA) shall be Grade PG 64-10, conforming to the provisions of Sections 92 of the Caltrans Standard Specifications.
B. Asphalt dikes, asphalt ditches and miscellaneous areas the grade of the asphalt binder for the Hot mix asphalt (HMA) shall be PG 70-10.
2.3 AGGREGATE
8.k
August 12, 2024
Packet Pg. 339
Technical Specifications Highlands Park Path Project C1811 TP - 77
A. Aggregate shall be clean and free from deleterious substances and shall meet the gradation and quality for 1/2-inch and 3/8-inch HMA Type A in the Caltrans Standard Specifications.
B. Reclaimed Asphalt Pavement (RAP) aggregate may be substituted for a part of virgin aggregate in a quantity not to exceed fifteen percent (15%) by weight of the aggregate blend.
1. RAP shall conform to Section 39-2.02A (4) (b) (iii) Reclaimed Asphalt Pavement of the State Standard Specifications.
2. During Type A HMA production, sample RAP twice daily and perform QC testing for:
a. Aggregate gradation at least once a day under California Test 384. b. Moisture content at least twice a day.
2.4 HOT MIX ASPHALT
A. Hot Mix Asphalt shall be HMA Type A and conform to the latest provisions of Section 39 of the Caltrans Standard Specifications.
B. Asphalt Concrete for the surface course shall be ½ Type A, in accordance with Section 39 of State Standard Specifications as modified in these Technical Provisions and the Special Conditions.
C. HMA batch plant shall be Department-qualified under the Departments Materials Plant Quality Program of the Caltrans Standard Specifications.
PART 3 EXECUTION
3.1 GENERAL
A. Approximate areas for digouts (pavement repairs) will be marked out in the field by City prior to the preconstruction conference. Areas marked out shall be cut along the perimeter, removed to depths indicated on the plans, cleaned, prepared with tack coat, filled with hot mix asphalt and compacted in accordance with these specifications.
B. Hot mix asphalt overlay shall be placed to the limits shown on the Plans to the limits of conform and edge grinds.
C. Hot mix asphalt shall be proportioned, mixed, placed, spread and compacted in layers in conformance with the Standard HMA Construction Process described in Section 39 of the Caltrans Standard Specifications.
3.2 PROTECTION OF EXISTING STREET SURFACE
A. During the entire construction period, the Contractor shall take care to protect
8.k
August 12, 2024
Packet Pg. 340
Technical Specifications Highlands Park Path Project C1811 TP - 78
existing pavement and concrete surfaces. Surfaces scarred by cleanup or equipment shall be repaired in a manner satisfactory to the Engineer. Any and all damage caused by the Contractor's operations to existing roads and streets shall be repaired by the Contractor to at least the original condition and to the satisfaction of the Engineer, at no additional cost to the City.
B. If pavement is damaged (excessive loading, grouser marking, scarring/scraping of pavement, etc.) outside the limits of the work, a full lane width grinding and overlay will be required as directed by the Engineer at no additional compensation to the Contractor.
3.3 PAVING REMOVAL (DIGOUTS)
A. Saw cutting, grinding, and asphalt concrete removal shall be required for digouts and surface preparation on paved roads.
B. Subgrade in digout areas shall be compacted in place to a firm and unyielding condition prior to placement of HMA.
C. Clean and dry the dig out area and planed surfaces prior to commencing with work.
3.4 TACK COAT
A. Ensure the digout area is clean and dry. All material accumulations which would interfere with the adhesion of the tack coat or with the placing and performance of the hot mix asphalt shall be removed, including dust, loose aggregate, soil, leaves, and pieces or lumps of other foreign material deposited on the surface.
B. A tack coat shall be applied to existing pavement including planed surfaces, between HMA layers, and to vertical surfaces of curbs, gutters and construction joints at the minimum residual rates specified in Section 39-1.09C Tack Coat of the Caltrans Standard Specifications.
C. Before placing hot mix asphalt, a tack coat shall be furnished and applied uniformly to contact surfaces of all cold pavement joints, curbs, gutters, and all existing pavement to be surfaced in conformance with Section 39 of the Caltrans Standard Specifications.
D. Asphalt binder tack coat shall be placed under reinforcing mat to the application rates in compliance with the manufacturers recommendations.
E. Asphaltic emulsion tack coat shall be placed over planed surfaces to the application rates in the Caltrans Standard Specifications.
F. Tack coat shall be applied to any course in advance of spreading the next course unless the surface temperature is at least 140 °F.
G. Hot mix asphalt shall not be placed until tack coat has cured. Immediately in
8.k
August 12, 2024
Packet Pg. 341
Technical Specifications Highlands Park Path Project C1811 TP - 79
advance of placing HMA, apply additional tack coat to damaged areas or where loose or extraneous material is removed.
H. Close areas receiving tack coat to traffic. Do not track tack coat onto pavement surfaces beyond the job site.
3.5 TRANSPORTING HOT MIX ASPHALT
A. From mixing site in trucks having tight, clean compartments.
B. Coat hauling compartments with lime-water mixture to prevent sticking.
C. Elevate and drain compartment of excess solution before loading mix.
D. Provide covers over asphalt concrete mixture to protect from weather and to prevent loss of heat.
E. During periods of cold weather or for long distance deliveries, pre-insulation around entire truck bed surfaces.
F. Do not use petroleum products such as kerosene or diesel fuel to release HMA from trucks, spreaders, or compactors.
3.6 HOT MIX ASPHALT
A. HMA surfacing shall conform to the provisions of Section 39 of the Standard Specifications. Placing HMA shall be done under suitable weather conditions for such operations. Rain, snow or other inclement weather will be cause for discontinuing paving Work. The Engineer shall have the authority for determining whether weather conditions are sufficient cause to postpone work.
3.7 ASPHALT INLAY/OVERLAY
A. HMA The quality control measures for the asphalt concrete shall be as outlined in Section 39 Asphalt Concrete of the State Standard Specifications.
B. Certificates of Compliance, in accordance with Section 6-2.03C, "Certificates of Compliance" of the State Standard Specifications, shall be required from the supplier of the asphalt concrete and submitted to the Engineer not less than 10 working days prior to any scheduled asphalt concrete paving.
C. The Contractor shall schedule his paving operations such that at the end of each working day, the distance between the ends of the layers of asphalt concrete on adjacent lanes shall not be greater than 10 feet nor less than 5 feet. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms. Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.
8.k
August 12, 2024
Packet Pg. 342
Technical Specifications Highlands Park Path Project C1811 TP - 80
D. Half-width surfacing operations shall be conducted in such manner that, at the end of each day's work, the distance between the ends of adjacent surfaced lanes shall not be greater than can be completed in the following day of normal surfacing operations.
E. All paving joints shall be on lane lines only.
F. Prior to placing the surface course, the finished surface of the previous layer shall not vary at any point more than 0.05-foot above or below the grade established by the Engineer.
G. All trimming of the surface shall be completed while the temperature of the mix is above 200 °F.
H. The final lift of asphalt concrete (the top lift) shall be placed in one continuous operation.
I. The Contractor shall not perform paving operations when the weather is rainy or foggy. It shall be the Contractor's responsibility, based on weather predictions, to schedule his paving operations to avoid paving in the rain or fog. If the day's operations are canceled because of predicted rain or fog, a nonworking day will be allowed regardless of actual working conditions.
J. Asphalt concrete shall not be placed on any surface which contains ponded water or excessive moisture in the opinion of the City Engineer.
K. If paving operations are in progress and rain or fog forces a shutdown, loaded trucks shall return to the plant and no compensation will be allowed therefor.
L. The Contractor shall furnish and use canvas tarpaulins to cover all loads of asphalt concrete from the time that the mixture is loaded until it is discharged from the delivery vehicle, unless otherwise directed in writing by the Engineer.
M. Immediately before Asphalt Concrete is placed, a tack coat shall be applied to all horizontal and vertical surfaces as specified in Section 39-1.02B Tack Coat of the State Standard Specifications.
N. No traffic shall be allowed on the asphalt tack coat with the exception of vehicles unloading asphalt concrete. All vehicles involved with the Contractor's operations shall turn around within the road right-of-way. Driveways and other private property shall not be used without prior written consent of the involved property owner, a dated copy of which shall be delivered to the Engineer prior to the use thereof.
O. The area to which the tack coat has been applied shall be closed to public traffic.
Care shall be taken to avoid tracking the asphaltic emulsion material onto existing pavement surfaces beyond the limits of construction.
8.k
August 12, 2024
Packet Pg. 343
Technical Specifications Highlands Park Path Project C1811 TP - 81
P. All asphalt concrete spillage and/or tracking of tack coat (asphaltic emulsion) or other materials on public streets, driveways and gutters shall be removed or cleared within 48 hours of the AC pavement placement. If existing striping is marked by emulsion or other materials, it shall be repainted/restored. Alternatively, existing striping may be protected by a method approved by the Engineer.
Q. Conform cuts between existing pavement and newly constructed pavement shall be made by cutting the existing pavement to a neat, smooth line at the limit lines and constructing a vertical-face butt joint.
R. At cross streets where distinct limit lines exist due to previous treatments, the new conform limit line shall overlap the existing limit line a minimum of 6 inches.
S. Batch data and load slips shall be presented to the Engineer as asphalt is delivered to the project site. Failure to do so may result in non-payment for questionable quantities or rejection of the load.
3.8 BASE FAILURE REPAIR
A. Base failure repair of existing asphalt concrete shall be performed in accordance with Section 39-3.04, Cold Planing Asphalt Concrete, of the 2015 Caltrans Specifications and these Special Provisions.
B. The locations for the AC base repairs will be identified, marked and quantified by the Engineer after AC cold planning is completed. The Contractor shall notify the Engineer 48 hours in advance of the cold planning operation. The Contractor shall allow the Engineer 24 hours to complete the identification of the AC base repairs.
The Asphalt Concrete Pavement Repair that will be paid for shall be the actual square feet of repair that was marked-out by the by the Engineer in the field prior to asphalt concrete pavement repair construction.
C. Existing asphalt concrete and base material shall be removed to a minimum depth of 6 below the grade of the existing surfacing at locations shown on the drawings.
The resulting depression shall be filled with a deep lift of asphalt concrete in conformance with pertinent Technical Provisions.
D. The base failure conform limits shall be saw cut or ground in neat, straight lines.
Conform corners shall be square and any conform edges that are broken after saw cutting or grinding shall be re-cut at no additional charge.
E. Prior to filling the areas with asphalt concrete, the subgrade shall be compacted to 95 percent relative compaction in accordance with Section 19-5.03B of the Standard Specifications of the State of California and to the satisfaction of the Engineer.
F. If, in the opinion of the Engineer, excessively wet areas still exist at the subgrade that cannot obtain a relative compaction of 95 percent then all undesirable material then encountered will be removed and disposed of as directed by the Engineer.
8.k
August 12, 2024
Packet Pg. 344
Technical Specifications Highlands Park Path Project C1811 TP - 82
Quantities of removed, unsuitable material (including the material used as replacement) shall be paid for as extra work as provided for in these Specifications.
G. The existing asphalt concrete vertical (and horizontal, if any) surfaces upon which new asphalt concrete will be placed shall be treated with asphaltic emulsion tack coat.
H. Asphalt Concrete shall be placed in 2 lifts unless otherwise shown on the plans or as directed by the Engineer. Asphalt concrete shall be compacted to a relative compaction of 95 percent. Base failures shall be completed prior to any inlay/overlay activities on any given street.
I. All base failure areas excavated in any one day shall be backfilled that same day.
No excavated areas will be permitted to remain open overnight.
J. Asphalt concrete shall be placed only when the atmospheric temperature is a minimum of 50 degrees Fahrenheit and rising.
K. The locations for base failure repair shall be as shown on the drawings and/or will be marked in the field by the Engineer.
3.9 SPREADING AND COMPACTING
A. Spreading and compacting shall be performed in accordance with Section 39-1.10 and Section 39-1.11 of the Standard Specifications.
B. HMA shall be transferred from the trucks into the hopper of the paving machine by means of a shoulder machine equipped with a conveyor belt as needed. Any equipment used to transfer asphalt concrete to the paving machine shall not exceed the load capacity of any surface it is driven over and, therefore, shall not produce rutting or pumping of the existing roadway surface or newly placed HMA at any time. No trucks or other rubber-tired construction equipment are allowed on the subgrade at any time except when proof rolling in the presence of the Engineer.
No trucks or other rubber-tired construction equipment are allowed on newly placed HMA until the day after the HMA is placed.
C. Longitudinal joints in the top layer must match specified lane edges shown on the striping plans. Longitudinal joints in lower HMA layers shall be offset at least 0.5 feet from each side of the specified lane edges.
D. Finish rolling shall be completed before pavement surface temperature is below 150 degrees F.
E. Traffic shall not be allowed on HMA until mid-depth temperature is below 160 degrees F and the pavement surface temperature is below 140 degrees F.
3.10 ASPHALT CONCRETE DIKES, MISCELLANEOUS AREAS AND DITCHES
8.k
August 12, 2024
Packet Pg. 345
Technical Specifications Highlands Park Path Project C1811 TP - 83
T. Asphalt concrete for dikes shall be Type A, 3/8 maximum size aggregate.
U. Prepare the areas to receive HMA for miscellaneous areas and dikes, including excavation, placing tack coat, and backfill as needed.
V. Spread the HMA in miscellaneous areas in 1 layer and compact to the specified lines and grades.
W. The finished surface must be:
1. Textured uniformly
2. Compacted firmly
3. Without depressions, humps, and irregularities.
3.11 MANHOLE, VALVE BOX, CLEANOUT AND MONUMENT ADJUSTMENT A. All existing water valves, sewer clean-outs, monuments, manholes and public utility facilities shall be adjusted to finished grade by the Contractor within seven (7) calendar days after paving over each structure per Section 3.5 of the City Design Guidelines, Section 15-2.10B Adjust Frames, Covers, Grates, and Manholes" of the State Standard Specifications, these Technical Provisions and as directed by the Engineer.
B. Raise public utility facilities in coordination with the requirements of and in coordination with the various public utilities and as indicated on the Plans.
C. Monument boxes, water value boxes and detector hand-hole boxes shall be adjusted to grade in conformance with the provisions in Section 15-2.05, "Reconstruction," of the Standard Specifications and in accordance with the City Design Guidelines.
D. Gate valves shall be adjusted per City specifications, sewer cleanouts shall be adjusted per City Detail 17, and city monuments shall be adjusted per City Detail
30. E. Adjusting existing manholes to grade shall include adjusting cone sections as necessary. Adjusting existing valve boxes to grade shall include extension of valve stems.
F. Prior to any work on the sewer manholes, the Contractor shall install false bottoms in the manholes impacted by the work. Upon completion of the work the false bottoms shall be removed.
G. Except as approved by the Engineer, Contractor shall protect utility iron to be raised to grade while concrete collars are curing and keep traffic off of raised facilities for 48 hours or until concrete has reached a minimum strength of 1,000 psi. Any damage to utility iron, concrete collars or new HMA pavement shall be repaired or replaced at the Contractors expense and to the satisfaction of the Engineer.
8.k
August 12, 2024
Packet Pg. 346
Technical Specifications Highlands Park Path Project C1811 TP - 84
H. Utility manhole frame, chimney and covers shall be removed and replaced per the Contract Documents.
I. Coordinate the iron raising and patch paving so that no partially completed iron raising remains over the weekend.
J. Utility box/cover (eg water meter, sewer clean out, etc) on the road asphalt concrete pavement shall be replaced with box/cover with H20 traffic rated loading.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 347
Technical Specifications Highlands Park Path Project C1811 TP - 85
SECTION 321313 CONCRETE IMPROVEMENTS
PART 1 GENERAL
1.1 WORK INCLUDED
A. Work shall consist of removing and modifying inlet manholes at locations indicated on the plans or as directed by the Engineer. New concrete inlet structure concrete shall comply with the City of San Carlos Standard Details and in accordance with the Caltrans Standard Specifications.
1.2 SUBMITTALS
A. The Contractor shall furnish a concrete mix design to the Engineer at least ten (10) working days prior to the start of the work.
PART 2 MATERIALS
2.1 CONCRETE
A. Concrete drainage structures shall comply with 51-7, Minor Structures, of the State Standard Specifications. Concrete shall meet the following requirements: Compressive Strength: 3000 psi @ 28 days Maximum Slump: 4 inches
Lamp Black: 1 lb. / cy
2.2 REINFORCEMENT
A. Reinforcement for concrete structures shall conform to Sections 52-1.01 through 52-1.04 inclusive of the Caltrans Standard Specifications except that Butt Welded Splices shall not be permitted.
2.3 HOT MIX ASPHALT CONFORM
A. The hot mix asphalt conform material adjacent to concrete improvements shall comply with the Section 321216 Paving Systems in these specifications.
PART 3 EXECUTION
3.1 FORMS
A. Wooden forming shall be of two-inch nominal thickness staked at two-foot intervals. The maximum gap at the bottom of the forms shall be 1-3/4 inches.
Forms shall not be installed until after base material has been placed and compacted.
3.2 PROTECTION OF EXISTING FACILITIES
8.k
August 12, 2024
Packet Pg. 348
Technical Specifications Highlands Park Path Project C1811 TP - 86
A. The contractor shall protect existing facilities from damage, and discoloration from concrete splash. Adjacent concrete facilities shall be covered during concrete placement to prevent concrete splash and excess concrete from staining the adjacent concrete. After initial placement, strikeoff and finishing, the protection shall be removed and the adjacent concrete cleaned.
B. Vertical existing facilities such as light poles, walls, etc. shall be protected with plastic extending a minimum of three feet above the concrete surface. After initial placement, strikeoff and finishing, the protection shall be removed and the vertical surfaces cleaned.
C. Existing curb outlet drain pipes (under sidewalk drains) shall be protected, rerouted, or replaced and incorporated into the new curb & gutter and curb ramps as applicable. The cost to protect, reroute or replace the curb outlet drain pipes shall be included in the price paid for the various contract items of work involved and no additional compensation will be allowed therefor.
3.3 PLACING AND FINISHING CONCRETE
A. No concrete shall be placed until the forms have been approved.
B. Concrete shall be deposited on a moist grade in such a manner as to require as little re- handling as possible. In general, adding water to the surface of the concrete to assist in finishing operations shall not be permitted.
C. Control joints and expansion joints shall be installed at locations noted on the plans, to match existing, as approved on the score line and expansion joint submittal or as directed by the Engineer. If expansion joint material is used, a minimum of two, 1/2 inch by eighteen-inch dowels shall be used with additional dowels placed every twenty-four inches. Control joints in sidewalks may be made using a tooled joint which shall extend a minimum of 1/4 of the depth of the concrete and shall not be less than 1-1/2 inches in depth.
D. Unless otherwise directed by the Engineer, a medium broom finish shall be applied to match existing facilities in texture and appearance. An approved white or clear liquid curing compound shall be applied to the newly paced concrete after finishing operations have been completed. Full compensation for applying curing compound to all exposed faces of the concrete surface shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
E. All new concrete sidewalk and curb & gutter shall be doweled and epoxied into the existing concrete sidewalk and curb & gutter using #4 rebar at 20 O.C. (minimum of 2). A minimum of 6 Class 2 aggregate base shall be placed and compacted in conformance with these Technical Provisions. Full compensation for furnishing and installing dowels, epoxy and Class 2 aggregate required for the concrete construction shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
8.k
August 12, 2024
Packet Pg. 349
Technical Specifications Highlands Park Path Project C1811 TP - 87
F. Full compensation to procure, deliver, place, spread, and compact imported topsoil material shall be considered as included in the contract prices for the various contract items of work involved, and no additional compensation shall be allowed thereof.
3.4 CONCRETE PROTECTION
A. The Contractor shall protect the concrete against traffic and vandalism. If the concrete is damaged or vandalized, the Contractor shall make the necessary repairs at its own expense. The repair procedure for damaged or vandalized concrete shall be approved in advance by the Engineer.
3.5 OTHER CONCRETE WORK
A. All landscape restoration including the restoration of any landscaping, irrigation, hardscape, brick work or walls shall be included in the price paid for the various contract items of work involved and no additional compensation will be allowed therefor.
3.6 CARE AND REPAIR OF CONCRETE
A. Repair shall be per ACI 301 with the following requirements:
a. Patching mortar shall be Sikatop 123 Plus or approved equal. b. Use Sikadur 32 HiMod bonding agent or approved equal. c. Honey and defects deeper than 1.5 inches shall require approval by Engineer prior to commencing repair work.
d. Cracks wider than 0.02 inches for hydraulic structures shall be repaired prior to leak testing.
e. Cracks wider than 0.04 inches shall be repaired.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 350
Technical Specifications Highlands Park Path Project C1811 TP - 88
SECTION 331400 TIMBER SOLDIER PILE RETAINING WALL
PART 1. GENERAL
1.1 DESCRIPTION
A. The work in this section shall include the materials, equipment, and labor necessary to construct the steel soldier pile and timber lagging retaining walls and related work as shown on the drawings.
B. The Contractor shall satisfy himself as to the nature and quantity of materials likely to be encountered at the site and other work to be performed, and any differences between site conditions shown on the drawings and the actual conditions immediately prior to commencement of work.
1.2 REFERENCE DOCUMENTS
A. American Association of State Highway and Transportation Officials (AASHTO)
1. AASHTO M 252 Corrugated Polyethylene Drainage Pipe
2. AASHTO M 288 Geotextile Specification for Highway Applications B. American Society for Testing and Materials (ASTM)
1. ASTM C140 Sampling and Testing Concrete Masonry Units
2. ASTM D442 Particle Size Analysis of Soils
3. ASTM D698 Laboratory Compaction Characteristics of Soil Standard Effort
4. ASTM D1556 Standard Test Method for Density and Unit Weight of Soil In Place by the Sand Cone Method
5. ASTM D1557 Laboratory Compaction Characteristics of Soil Modified Effort
6. ASTM D2487 Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System)
7. ASTM D2922 Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
8. ASTM D3034 Standard Specification for Type PSM Poly (Vinyl Chloride) (PVC) Sewer pipe and Fittings
9. ASTM D4318 Liquid Limit, Plastic Limit and Plasticity Index of Soils
10. ASTM D4475 Horizontal Shear Strength of Pultruded Reinforced Plastic Rods
11. ASTM D4476 Flexural Properties of Fiber Reinforced Pultruded Plastic Rods
12. ASTM D4595 Standard Test Method for Tensile Properties of Geotextiles by Wide-Width Strip Method
13. ASTM D4873 Standard Guide for Identification, Storage and Handling of Geosynthetics
14. ASTM D5262 Standard Test Method for Evaluating the Unconfined Tension
8.k
August 12, 2024
Packet Pg. 351
Technical Specifications Highlands Park Path Project C1811 TP - 89
Creep Behavior of Geosynthetics
15. ASTM D5321 Standard Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method
16. ASTM D5818 Standard Practice for Obtaining Samples of Geosynthetics from a Test Section for Assessment of Installation Damage
17. ASTM D6637 Standard Test Method for Determining Tensile Properties of Geogrids by the Single or Multi-Rib Method
18. ASTM D6638 Standard Test Method for Determining Connection Strength Between Geosynthetic Reinforcement and Segmental
Concrete Units
19. ASTM D6706 Standard Test Method for Measuring Geosynthetic Pullout Resistance in Soil
1.3 DEFINITIONS
A. Filter Fabric - Manufactured geotextile fabric used to segregate and contain differing material while allowing the passage of water through the fabric.
B. Lagging - Pressure treated timber boards that span between soldier piles and are part of the retaining wall. The lagging retains soil and transfers the load to the soldier piles.
C. Permeable Material - Gravel, and/or crushed stone designed to allow the drainage of water through the material.
D. Soldier Pile - Structural steel beam encased in concrete within a drilled hole. The upper portion of the steel beam, not embedded in concrete, retains soil and is part of the visible wall. The loads from the upper portion are transferred to the concrete encased lower portion.
PART 2. PRODUCTS
2.1 CONCRETE
A. The concrete must comply with the testing and corresponding specifications in Section 90 Concrete of the State Standard Specifications. The concrete must have a quality of workability suitable for uniform and proper placement, and when cured must have the required strength and durability. The concrete shall have a minimum 28 day compressive strength (f'c) of 2,500 psi, unless otherwise specified by the Engineer.
2.2 STEEL SOLDIER PILES
A. The steel soldier piles must comply with Section 49-2.03 Structural Shape Steel Piling. The steel soldier piles shall be ASTM A36/A36M, ASTM A572/A572M, ASTM A709/A709M, or ASTM A992/A992M. The length and size of the steel
8.k
August 12, 2024
Packet Pg. 352
Technical Specifications Highlands Park Path Project C1811 TP - 90
soldier piles shall be as shown on the plans.
2.3 TIMBER LAGGING
B. The wood lagging must comply with Section 57 Wood and Plastic Lumber Structures. Wood lagging shall be Douglas-Fir No. 1 or better. The lagging shall be pressure treated in accordance with AWPA Specifications P-5 using ACZA with a net retention of at least 0.6 pounds per cubic foot. The sizes and lengths of timber lagging required are shown on the plans.
2.4 PROTECTIVE COATING
A. Protective Coating for Steel - Protective coating for exposed steel shall be 2 coats of Black Coal Tar Epoxy, Koppers Bitumastic No. 3000-M, Americoat 78 HB, or equivalent approved by the Engineer.
2.5 FILTER FABRIC
A. Filter fabric shall conform to the provisions of Section 88 Geosynthetics of the Standard Specifications. Filter fabric shall be Mirafi 140N or approved equal.
2.6 DRAINAGE PIPE
A. If required, drainage pipe shall be perforated or slotted PVC pipe manufactured in accordance with ASTM D3034 or corrugated HDPE pipe manufactured in accordance with AASHTO M252.
2.7 4-INCH PERFORATED SUBDRAIN
A. A cleanout shall be installed at the ends of subdrain runs and as shown on Plans.
B. Unless otherwise permitted by the Engineer, any over-deflected pipe shall be uncovered and, if not damaged (as determined by the Engineer), it shall be reinstalled. Damaged pipe shall be removed and replaced with new pipe.
PART 3. EXECUTION
3.1 EXCAVATION
A. Contractor shall excavate to the lines and grades shown on the construction drawings. The Owner or Contractors QA/QC representative shall inspect the excavation and test the foundation soils and approve prior to placement of the leveling pad material or fill soils. Any over-excavation required to remove unsuitable soils shall be oversized from the front of the leveling pad and back of the geogrid reinforcement.
8.k
August 12, 2024
Packet Pg. 353
Technical Specifications Highlands Park Path Project C1811 TP - 91
B. Over-excavation and replacement of unsuitable soils and replacement with approved compacted fill will be compensated as agreed upon with the Owner.
C. Soldier pile excavations shall be drilled with a bucket or auger type drilling rig or other equipment of suitable capacity and power to excavate to the required diameter and depth. The diameter of the drilling bucket or auger bit, or the inside diameter of the casing, shall be equal to or larger than the required diameter, as shown on the plans. The drilling tools shall include carbide tipped augers and rock coring buckets as necessary for the conditions at the site.
D. All soldier pile excavations shall be carefully located and aligned by the Contractor in the field. The center of the top of the drilled hole shall not deviate more than 2 inches in any direction from the center location shown on the plans.
E. The soldier pile excavation shall be performed under the intermittent observation of the Engineer to confirm that subsurface conditions are as expected. The Contractor shall keep records of the excavation depth and the transition depth from soil to rock for each drilled excavation. Adjustments to the pier depths as shown on the plans, may be required by the Engineer.
F. Soil can be excavated with auger type equipment. If the drilled excavation is unstable and/or sloughing of the sides is occurring, then temporary casing must be used to maintain stability during and after drilling. As an alternate, drilling mud may be used to maintain hole stability, but only after the Contractor has fully described his proposed method, materials, and procedures and has received approval of the Engineer.
G. All water, loose soil, rocks and other debris shall be removed from the bottom of the drilled excavation prior to placing steel or concrete.
3.2 SOILDER PILE INSTALLATION
A. Prior to placing the steel, a minimum of 3 inches of dry concrete shall be placed in the bottom of the hole to provide concrete cover for the steel. The steel soldier piles shall be placed and securely blocked from the sides of the hole so that there is a minimum concrete cover of 3 inches.
B. The alignment and verticality of each soldier pile shall be checked by the Contractor and Engineer. The soldier piles shall not vary more than ½ inch from a string line sets along the planned alignment. The verticality of each soldier pile shall not vary more than ½ inch in 10 feet.
C. Each pier excavation and steel placement will be inspected and approved by the Engineer prior to placement of concrete. Concrete placement shall start as soon as possible after the drilling, de-watering, clean-out and steel placement has been inspected and shall progress in a continuous operation so that not more than one hour elapses between beginning and completion of the concrete placement in any
8.k
August 12, 2024
Packet Pg. 354
Technical Specifications Highlands Park Path Project C1811 TP - 92
pile excavation. An accurate record of the amount of concrete placed in each excavation shall be maintained by the Contractor.
D. To prevent segregation, concrete shall be placed so that it does not deflect off the sides of the holes or steel section. Concrete shall not free fall more than 5 feet.
Tremie pipes with hoppers or flexible trunks, or approved alternate methods of placement shall be used where necessary.
E. Concrete placed in a slurry supported excavation or an excavation containing ground water in excess of 6 inches shall be tremied into the excavation. The concrete shall be placed by tremie pipe and hopper or pumped into the excavation with the pipe or pump hose placed at the bottom of the drilled hole. The pipe or pump hose shall be maintained at least 2 feet below the top of concrete as the level of concrete rises in the excavation. The top of concrete level shall be continuously measured by the Contractor.
F. As concrete is placed, the casing, if used, shall be removed from the hole. The bottom of the casing shall be maintained a sufficient distance, but no less than 2 feet below the top of the concrete to prevent intrusion of the surrounding rock or soil into the hole. The top of concrete level shall be continuously measured by the Contractor. The concrete shall not be permitted to separate during withdrawal of the casing, as evidenced by a rise of the surface of the concrete as the casing is being pulled. Hammering, vibrating the concrete internally or vibrating the casing, or other means shall be used as necessary to prevent separation. If the concrete column becomes separated, the steel soldier pile shall immediately be withdrawn from the hole and the concrete removed before it sets up.
G. All exposed steel that is not encased in concrete shall be protected with 2 coats of approved coating applied in conformance with the manufacture's recommendations. Any portions of the protective coating that are scratched, nicked or otherwise disturbed during construction shall be touched-up with additional coats of the metal finish.
3.3 TIMBER LAGGING INSTALLATION
A. Timber lagging shall be installed between the soldier piles. The lagging shall be cut so that there is a tight fit between soldier piles. All cut off ends shall be treated by applying two coats of preservative. The preservative shall not be applied in wet or damp weather. Unless otherwise shown on the plans, lagging shall be placed level. Redwood or pressure treated lumber shall be used as spacers to provide the designed gap between lagging and as blocking between the steel and lagging, as shown on the plans.
3.4 REINFORCED BACKFILL PLACEMENT
A. Permeable material at least 1 foot thick shall be placed between the retained soil and soldier pile wall. The drainage blanket shall consist of filter fabric and permeable material. The filter fabric shall be continuous between the retained soil
8.k
August 12, 2024
Packet Pg. 355
Technical Specifications Highlands Park Path Project C1811 TP - 93
and permeable material as shown on the plans. Permeable material shall be placed from the bottom of the wall to within 1 foot of the ground surface. The upper 1 foot of backfill shall be soil, or other impermeable material, as shown on the plans.
3.5 REINFORCED BACKFILL PLACEMENT
A. The area between the excavation and the retaining wall drainage shall be backfilled with select fill. Permeable material and select fill used as backfill shall be compacted to at least 90 percent relative compaction in accordance with ASTM test method D1557.
3.6 AS-BUILT CONSTRUCTION TOLERANCES
A. Vertical alignment: ± 1.5 inches (40 mm) over any 10 foot (3 m) distance.
B. Wall batter: within 2 degrees of design batter. Overall wall batter shall be ≥ 0 degrees.
C. Horizontal alignment: ± 1.5 inches (40 mm) over any 10 foot (3 m) distance.
D. Corners and curves: ± 1 foot (300 mm) to theoretical location.
E. Maximum horizontal gap between erected units shall be ≤ 1/2 inch (13 mm).
3.7 FIELD QUALITY CONTROL
A. Quality Assurance The owner shall/may engage inspection and testing services, including independent laboratories, to provide quality assurance and testing services during construction. This does not relieve the Contractor from securing the necessary construction quality control testing.
B. Quality assurance shall also include observation of the construction for general compliance with the design drawings and project specifications. Quality assurance is usually best performed by the site geotechnical engineer.
C. Quality Control The Contractor shall engage independent inspection and testing services to perform the minimum quality control testing described in the retaining wall design plans and specifications. Only qualified and experienced technicians and engineers shall perform quality control testing and inspection services.
D. Quality control testing shall include soil and backfill testing to verify soil types and strengths, compaction and moisture conditions and verification that the retaining wall is being constructed in accordance with the design plans and specifications.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 356
Technical Specifications Highlands Park Path Project C1811 TP - 94
SECTION 332250 SHORING AND TRENCH SAFETY
PART 1 GENERAL
1.1 SECTION INCLUDES
1. Shoring required for general safety, worker protection, and protection of adjacent property and pipelines from the hazards of caving ground.
2. Shoring for trench excavations.
3. Shoring for structural excavations.
4. Shoring for tunneling pits.
5. Contractor's responsibilities.
6. Contractor's trench safety plan.
7. Contractor's supervisor.
1.2 RELATED SECTIONS
1. Section 020010 Site Conditions
2. Section 020030 Existing Utilities and Underground Structures
3. Section 021100 Site Preparation
4. Section 332315 Excavation and Backfill
1.3 CONTRACTOR'S RESPONSIBILITIES FOR SAFETY
1. The Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons (including employees) and property during performance of the work. This requirement shall apply continuously and not be limited to normal working hours.
2. Minimum Requirements for Project Shoring Systems:
1. Comply with all governing regulations pertaining to excavation safety including the most current edition of Cal/OSHA Construction Safety Order, Article 6;
2. Be compatible with the surface and subsurface soil and groundwater conditions mapped and encountered in test borings for the project and resist lateral earth pressures and hydrostatic pressures (where not dewatered);
3. Protect personnel that enter the excavation;
8.k
August 12, 2024
Packet Pg. 357
Technical Specifications Highlands Park Path Project C1811 TP - 95
4. Protect existing utilities, pavements, and structures;
5. Excavation and installation of the shoring system must occur in a manner and sequence that does not damage existing structures, pavements, and utilities including through settlement, heave, or vibrations;
6. Provide stable excavation walls and bottom (e.g., prevent bottom heave);
7. Be designed to operate in conjunction with dewatering and soil stabilization systems also provided by the Contractor.
8. As permitted by the specifications, allow for removal or abandonment of shoring in a manner and sequence that is instep with the backfilling sequence (i.e., shoring shall not be removed ahead of backfilling) and does not damage the finished pipeline or structures or existing structures, pavements, and utilities including through settlement, heave or vibrations (Contractor to address removal/abandonment concerns specific to the type of shoring proposed in the shoring submittal). Any void space created by shoring removal shall be completely filled with a material approved by the City Engineer;
9. Resist lateral live loads from vehicular and/or train traffic, construction equipment and spoils, if any;
3. Safety provisions shall conform to U.S. Department of Labor (OSHA), the California Occupational Safety and Health Act, and all other applicable Federal, State, county, and local laws, ordinances, codes, the requirements set forth below, and any regulations that may be detailed in other parts of these Specifications.
4. Contractor is advised that Part 1926 of 29 CFR, subpart P, has been revised. This regulation governs excavations, trenching and protective systems, sloping, benching, wood, and aluminum shoring for various types of soils, and depths of excavations. The Contractor shall follow these regulations (including the latest revisions) for this project.
F. Where any of these requirements are in conflict, the more stringent requirement shall be followed.
G. The Contractor shall cease work immediately and notify the Engineer if they determine their shoring method is unsafe.
1.4 PERMIT
1. For trenches or excavations of depth five feet or deeper, the Contractor shall obtain from the State Division of Industrial Safety a permit for such excavation; submit a copy of the permit to the Engineer, prior to initiating any work requiring said permit.
1.5 CONTRACTOR SUBMITTALS
1. The Contractors attention is directed to the provisions for "Shoring and Bracing Drawings" in Section 6705 of the California Labor Code. The Contractor, prior to beginning any trench or structure excavation 5 feet deep or over, shall submit to
8.k
August 12, 2024
Packet Pg. 358
Technical Specifications Highlands Park Path Project C1811 TP - 96
the Engineer for review for compliance with Section 6705 the Contractors detailed plan showing design of all shoring, bracing, sloping of the sides of excavation, or other provisions for worker protection against the hazard of caving ground during the excavation of such trenches or structure excavation. If such plan varies from the shoring system standards established in the Construction Safety Orders of the State of California, such alternative system plans shall be prepared, stamped and signed by a civil or structural engineer licensed in the State of California at the Contractors expense.
2. A professional Civil or Structural Engineer licensed in the State of California shall design, sign, and stamp the Contractors proposed shoring systems for review by the Engineer prior to construction. Submit shoring system submittal in conjunction with dewatering plan and soil stabilization plan.
3. The shoring system submittal shall address open cut trenching, each storm drain catch basin, manholes, and for all excavations located in close proximity to unlined drainage channels or in close proximity to critical structures, utilities, or granular non-cohesive materials. Individual submittals are required for all open-cut trenching and for each major underground structure (sewer tie-in locations) as well as existing critical utilities including those in close proximity to drainage channels or those that penetrate a 1.5H:1V plane projected down from the utility.
4. The use of speed shores or trench box shoring in flowing, running or raveling ground conditions shall not be allowed. The Contractor shall be aware that flowing, running or raveling ground conditions are anticipated throughout the project and shall design their shoring system accordingly.
F. Certificates of Compliance: Certificates of Compliance shall be provided for all products and materials proposed to be used under this Section.
G. For all materials that are not pre-approved by the City the Contractor shall designate the source and/or submit samples of all materials in advance of their use for required testing and Engineers approval. All testing costs shall be at the Contractors expense.
H. Contractor shall design shoring system to protect nearby utilities that may not daylight into trench excavation but limits of existing backfill in close proximity can become unstable due to the effects of ground disturbance and reduced strength caused by past nearby excavations and backfill. Past trench backfill has consisted of granular non-cohesive materials (including pea- gravel) and have little to no stand- up time. Full face, continuous excavation wall support shall be required in these areas.
1.6 SAFETY ORDERS
1. The Contractor shall have at the work site, copies or suitable extracts of the Construction Safety Orders of Cal-OSHA, and Part 1926 of 29 CFR, subpart P.
8.k
August 12, 2024
Packet Pg. 359
Technical Specifications Highlands Park Path Project C1811 TP - 97
2. All work shall comply with the provisions of these and all other applicable laws, ordinances and regulations.
3. The Contractor is prohibited in the use of unrestricted speed shores or trench box shoring in flowing, running, or raveling ground conditions.
1.7 CONTRACTOR'S SUPERVISOR
1. The Contractor shall appoint a qualified and competent supervisory employee who shall be responsible to determine the sloping or shoring system which shall be used depending on local soil type, water table elevation, stratification, depth, and any other pertinent factors including the safety of the workers.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 360
Technical Specifications Highlands Park Path Project C1811 TP - 98
SECTION 332315 EXCAVATION AND BACKFILL
PART 1 GENERAL
1.1 THE REQUIREMENT
A. The Contractor shall provide all materials, equipment, and labor necessary to perform and complete all utility earthwork as shown on the Drawings and as specified herein.
B. The work of this Section includes all earthwork required for construction of the project. Such earthwork shall include, but may not necessarily be limited to, the loosening, removing, loading, transporting, depositing, and compacting in its final location of all materials wet and dry, as required for the purposes of completing the work, which shall include, but not necessarily be limited to, the furnishing, placing, and removing of sheeting, shoring and bracing necessary to safely support the sides of all excavations; all pumping, ditching, draining and other required measures for the removal or exclusion of water from the excavation; soil stabilization; the supporting of structures above and below the ground; all backfilling around structures and all backfilling of trenches; the disposal of excess excavated materials; borrow of materials to make up deficiencies for fills; and all other incidental earthwork.
C. Hazardous materials shall be handled in accordance with all regulatory agency requirements.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Section 332250 Shoring and Trench Safety
B. Section 332538 Precast Concrete Storm Drain Structures C. Section 333600 Grout
1.3 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. State Codes:
California Labor Code.
Construction Safety Orders of the State of California.
B. State of California (Caltrans) Standards:
1. Standard Specifications:
Section 25 Aggregate Subbases.
Section 26 Aggregate Bases.
8.k
August 12, 2024
Packet Pg. 361
Technical Specifications Highlands Park Path Project C1811 TP - 99
Section 68 Subsurface Drains.
Section 88 Engineering Fabrics
C. Commercial Standards:
ASTM D 422 Test Method for Particle-Size Analysis of Soils.
ASTM D 1556 Test Method for Density of Soil in Place by the Sand-
Cone Method.
ASTM D 1557 Test Methods for Moisture-Density Relations of Soils and
Soil-Aggregate Mixtures Using 10-lb (4.54-kg)
Rammer and 18-in. (457-mm) Drop.
ASTM D 1633 Test Method for Compressive Strength of Molded Soil-
Cement Cylinders.
ASTM D 2419 Method for Sand Equivalent Value of Soils and Fine
Aggregate.
ASTM D 2487 Test Method for Classification of Soils for Engineering
Purposes.
ASTM D 2922 Test Methods for Density of Soil and Soil-Aggregate in
Place by Nuclear Methods (Shallow Depth).
ASTM D 3017 Test Method for Water Content of Soil and Rock in Place
by Nuclear Methods (Shallow Depth).
ASTM D 3776 Test Methods for Mass Per Unit Area (Weight) of Woven
Fabric.
ASTM D 3786 Method of Hydraulic Bursting Strength of Knitted Goods
and Nonwoven Fabrics: Diaphragm Bursting
Strength Tester Method.
ASTM D 4253 Test Methods for Maximum Index Density of Soils Using
a Vibratory Table.
ASTM D 4254 Test Methods for Minimum Index Density of Soils and
Calculation of Relative Density.
ASTM D 4318 Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
ASTM D 4491 Test Methods for Water Permeability of Geotextiles by
Permittivity.
ASTM D 4632 Test Method for Grab Breaking Load and Elongation
8.k
August 12, 2024
Packet Pg. 362
Technical Specifications Highlands Park Path Project C1811 TP - 100
of
Geotextiles.
ASTM D 4751 Test Method for Determining the Apparent Opening Size
of a Geotextile.
ASTM D 6023 Standard Test Method for Density, Yield, Cement
Content, and Air Content of Controlled Low-Strength
Material (CLSM).
OSHA Occupational Safety and Health Administration.
1.4 CONTRACTOR SUBMITTALS
A. The Contractor's attention is directed to the provisions for "Shoring and Bracing Drawings" in Section 6705 of the California Labor Code. The Contractor, prior to beginning any trench or structure excavation five (5) feet deep or over, shall submit to the Engineer for review for compliance with Section 6705 the Contractor 's detailed plan showing design of all shoring, bracing, sloping of the sides of excavation, or other provisions for worker protection against the hazard of caving ground during the excavation of such trenches or structure excavation. If such plan varies from the shoring system standards established in the Construction Safety Orders of the State of California, such alternative system plans shall be prepared, stamped and signed by a civil or structural engineer licensed in the State of California at the Contractors expense.
B. For all materials that are not pre-approved by the City the Contractor shall designate the source and/or submit samples of all materials in advance of their use for required testing and Engineers approval. All testing costs shall be at the Contractors expense.
C. Submit soil stabilization plan stamped and signed by a California registe red civil engineer with minimum five (5) years experience with such work.
D. Certificates of Compliance: Certificates of Compliance shall be provided for all products and materials proposed to be used under this Section.
1.5 QUALITY ASSURANCE
A. General: All soils and compaction testing will be done by a testing laboratory at the Contractors expense and as specified in Section 2, Special Provisions. The Engineer shall approve use of the Contractor-selected laboratory prior to the work.
B. Where soil material is required to be compacted to a percentage of maximum density the maximum density at optimum moisture content will be determined in accordance with ASTM D 1557. Where cohesionless, free draining soil material is required to be densified to a percentage of relative density the calculation of relative density will be determined in accordance with ASTM D 4253 and D 4254. Field
8.k
August 12, 2024
Packet Pg. 363
Technical Specifications Highlands Park Path Project C1811 TP - 101
density in-place tests will be performed in accordance with ASTM D 2922, or by such other means acceptable to the Engineer.
C. The Contractor shall notify the Engineer at least 48 hours prior to performing any utility excavation.
PART 2 PRODUCTS
2.1 BACKFILL MATERIALS
A. Backfill shall be a selected or processed clean, fine earth, rock, or sand, free from objectionable material, vegetation, or other deleterious substances.
B. The following TYPES of backfill materials are designated and defined as follows:
TYPE 1. Sand shall be material with 100 percent passing a 3/8-inch sieve, at least 90 percent passing a No. 4 sieve, and a sand equivalent value not less than
30. TYPE 2. Class 2 Aggregate Base shall be crushed rock aggregate base material meeting the requirements of Section 26, Aggregate Bases, for 19 millimeter (3/4 inch) maximum grading, of the Caltrans Standard Specifications.
TYPE 3. Class 1, Type A or B, Permeable Material shall be crushed stone, or gravel, durable and free from slaking or decomposition under action or alternate wetting or drying, uniformly graded, and shall meet the requirements of Section 68-
2.02F(2) for Class 1, Permeable Material, of the Caltrans Standard Specifications.
TYPE 4. Class 2 Permeable Material shall be crushed rock or gravel, durable and free from slaking or decomposition under the action of alternate wetting or drying, uniformly graded, and shall meet the requirements of Section 68-2.02F(3) for Class 2 "Permeable Material," of the Caltrans Standard Specifications.
TYPE 5. Structure Backfill Material shall meet the requirements of Section 19-
3.02B Type D of the Caltrans Standard Specifications.
TYPE 6. Class 3 Permeable Material shall be ¾ crushed rock or gravel, durable and free from slaking or decomposition under the action of alternate wetting or drying, uniformly graded, and shall meet the requirements of Section 68-2.02F(4) for Class 3 "Permeable Material," of the Caltrans Standard Specifications.
TYPE 7. Manufactured Backfill shall be manufactured, angular, granular, crushed stone, rock, or slag with 100 percent passing a one-inch sieve and less than one percent passing a No. 4 sieve.
TYPE 8. Controlled Low Strength Materials (CLSM) shall conform to the requirements of Section 02320, Controlled Low Strength Materials (CLSM).
8.k
August 12, 2024
Packet Pg. 364
Technical Specifications Highlands Park Path Project C1811 TP - 102
TYPE 9. Native material shall be material obtained from on-site excavations, provided the materials are not classified as unsuitable. Native material shall be free of stones, lumps, broken concrete or bituminous surfacing over 4 inches in diameter, objectionable material, vegetation, and deleterious substances.
TYPE 10. Topsoil material may be material which has been obtained at the site or may be imported. Removal of the topsoil shall be done after the area has been stripped of vegetation and debris as specified.
TYPE 11. Aggregate Subbase shall conform to the grading and quality requirements of Section 25, Class 2 Aggregate Subbase of the Caltrans Standard Specifications.
TYPE 12. Trench Foundation shall be 3/4-inch crushed, angular rock meeting the following gradation:
Sieve
Size
Percent Passing
1 ½ 100%
1 95-100%
½ 0-30%
#4 0-4%
2.2 UNSUITABLE BACKFILL MATERIAL
A. Any material as determined by the Engineer.
B. Any material determined to be hazardous is defined as unsuitable material.
C. Washed, smooth rock (pea gravel) is classified as unsuitable material.
2.3 USE OF BACKFILL MATERIAL TYPES
A. Backfill material types shall be used in conformance with City standards.
PART 3 EXECUTION
3.1 GENERAL
A. Where abandoned underground structures are encountered in the street areas, remove to sufficient depth to allow underground lines to cross, backfill and compact during rough grading. The Engineer may require further work to be done if visual inspection indicates during construction.
3.2 STRUCTURE EXCAVATION
8.k
August 12, 2024
Packet Pg. 365
Technical Specifications Highlands Park Path Project C1811 TP - 103
A. General: Except when specifically provided to the contrary, excavation shall include the removal of all materials of whatever nature encountered, including all obstructions of any nature that would interfere with the proper execution and completion of the work. The removal of said materials shall conform to the lines and grades shown on the Drawings or ordered by the Engineer. The Contractor shall furnish, place, and maintain all supports and shoring that may be required for the sides of the excavations, and all pumping, ditching, or other measures required for the removal or exclusion of water, including storm water, groundwater, and wastewater reaching the site of the work from any source so as to prevent damage to the work or adjoining property. Excavations shall be supported in a safe manner in accordance with applicable State safety requirements and the requirements of OSHA Safety and Health Standards for Construction (29CFR1926) and Section 02250, Shoring and Trench Safety. The limits of structure excavation shall be a minimum of 12 inches beyond the outside edge of the structure, and at a minimum no larger than necessary to facilitate backfill, compaction and testing operations.
3.3 PIPELINE AND UTILITY TRENCH EXCAVATION
A. Trench Width: Unless otherwise shown or directed, excavation for pipelines and utilities shall be open-cut trenches. Trench widths shall be as noted on the plans.
B. Subgrade: The surface of the subgrade after compaction shall be hard, uniform, smooth, self draining, and true to grade and cross section.
C. Trench Bottom: The pipe bedding shall be given a final trim establishing grade such that each pipe section when first laid will be continually in contact with the bedding along the extreme bottom of the pipe. Rounding out the trench bottom or bedding to form a cradle for the pipe will not be allowed. The Contractor shall excavate for bell holes and fittings.
D. Open Trench: The maximum amount of open trench permitted in any one location shall be the length necessary to accommodate the amount of pipe installed and backfilled in a single day. All trenches shall be fully backfilled at the end of each day or, in lieu thereof, shall be covered by heavy steel plates adequately braced and capable of supporting vehicular traffic in those locations where it is impractical to backfill at the end of each day.
E. Over-Excavation: Contractor shall notify Engineer if any unstable trench conditions develop in trench bottom. When ordered by the Engineer, whether or not indicated on the Drawings, trenches, tunneling pits and/or structure excavations shall be over-excavated beyond the depth shown in order to provide a firm and unyielding trench base.
3.4 OVER-EXCAVATION NOT ORDERED, SPECIFIED, OR SHOWN
A. Any over-excavation carried below the grade ordered, specified, or shown, shall be backfilled to the required grade and densified with the specified material and
8.k
August 12, 2024
Packet Pg. 366
Technical Specifications Highlands Park Path Project C1811 TP - 104
compaction. Such work shall be performed by the Contractor at its own expense.
3.5 EXCAVATION IN LAWN AREAS
A. Where excavation occurs in lawn areas, the sod shall be carefully removed, stockpiled, watered and preserved for replacement, unless specifically approved by Engineer in writing before Work is performed. Excavated material may be placed on the lawn provided that a tarp or other suitable method is employed to protect the lawn from damage. The lawn shall not remain stockpiled for more than 48 hours.
Immediately after completion of backfilling and testing of the pipeline, the sod shall be replaced in a manner so as to restore the lawn as near as possible to its original condition. Contractor shall provide new sod, in kind, if removed sod has remained stockpiled for more than 48 hours.
B. All other landscaping shall be replaced in kind as shown on the Drawings or as directed by the Engineer. All damaged irrigation systems, including piping and electrical wiring, shall be repaired and operating properly the same day they are damaged.
3.6 EXCAVATION IN VICINITY OF TREES
A. Except where trees are shown to be removed, Contractor shall protect trees from injury during construction operations. Remaining trees shall be protected by installing protective fencing outside the dripline. No tree roots over 2 inches in diameter shall be cut without express permission of the Engineer. Trees shall be supported during excavation by any means previously reviewed by the Engineer.
B. If existing roots over one inch in diameter are cut during the course of the work, the cut faces shall be thoroughly coated with root sealer and growth inhibitor. Exposed roots shall be covered with wet burlap to prevent them from drying out.
C. The City shall retain an arborist to evaluate the health of the trees prior to construction, formulate site-specific recommendations to maintain the health of trees during and after construction, and monitor construction near the trees at appropriate intervals.
3.7 DISPOSAL OF EXCESS EXCAVATED MATERIAL
A. The Contractor shall remove and dispose of all excess excavated material to a suitable site. The proper and legal disposal and associated costs shall be the responsibility of the Contractor.
3.8 BACKFILL - GENERAL
A. Backfill shall not be dropped directly upon any structure or pipe.
B. Unless specifically excepted by the Engineer, backfill shall not be placed until after
8.k
August 12, 2024
Packet Pg. 367
Technical Specifications Highlands Park Path Project C1811 TP - 105
all water is removed from the excavation.
3.9 PIPE AND UTILITY TRENCH ZONES AND BACKFILL
A. Pipe Zone:
1. The limits of Pipe Zone are shown on the plans.
2. The Pipe Zone shall be backfilled with the specified backfill material. Th e Contractor shall exercise care to prevent damage to the pipeline coating, cathodic bonds, or the pipe itself during the installation and backfill operations.
3. Verify pipe and manhole line and grade prior to installing Pipe Zone material.
4. Prevent flotation of sewer pipe during backfill operations.
5. Pipe Zone material to be compacted to 90% RC, with a maximum 6-inch lifts.
6. Demonstrate in the field and through compaction test results that installation and compaction efforts achieve proper compaction under the pipe haunches. This includes after the removal of shoring devices from the trench.
B. Trench Bedding: The limits of Bedding are shown on the plans.
1. After placement and compacting of the bedding material the Contractor shall perform a final trim for establishing grade, such that each pipe section when first laid will be continually in contact with the bedding along the extreme bottom of the pipe.
2. Contractor shall support and/or hold-down the pipe during placement as necessary.
3. Bedding shall be placed to form a smooth, uniform, horizontal plane to match pipe slope.
4. Hand-excavate flanges or bell holes at each pipe joint to provide uniform support for all sections of pipe.
C. Trench Zone: After the Pipe Zone backfill has been placed as specified above, and after all excess water has completely drained from the trench, backfilling of the Trench Zone may proceed. The limits of Trench Zone are shown on the plans.
D. Utility Crossing: For any new pipeline installation that crosses under an existing electric, gas, telephone, or cable TV utility pipe(s) or conduit(s) the Contractor shall replace the existing backfill material around the existing utility pipe(s) or conduit(s) with CLSM or as directed by the Engineer. For any new pipeline installation crossing under existing storm or sanitary sewer, the contractor shall replace existing backfill material with CLSM or as directed by the Engineer. Use a concrete vibrator during backfilling operations.
3.10 PLACING AND SPREADING OF BACKFILL MATERIALS
A. Backfill materials shall be placed and spread evenly in horizontal layers. The backfill layers shall be evenly spread so that when compacted, each layer shall not exceed 6 inches in thickness. Material for mechanically compacted backfill shall be placed
8.k
August 12, 2024
Packet Pg. 368
Technical Specifications Highlands Park Path Project C1811 TP - 106
in 8-inch maximum lifts prior to compaction.
B. Where the backfill material moisture content is below the optimum moisture content water shall be added before or during spreading until the proper moisture content is achieved.
C. Where the backfill material moisture content is too high to permit the specified degree of compaction, the material shall be dried or replaced until the moisture content is satisfactory.
D. Backfill shall be mechanically compacted by means of tamping rollers, sheepsfoot rollers, pneumatic tire roller, vibrating rollers, or other mechanical tampers. All such equipment shall be of a size and type subject to review by the Engineer. Impact-type pavement breakers (stompers) will not be permitted. Permission to use specific compaction equipment shall not be construed as guaranteeing or implying that the use of such equipment will not result in damage to adjacent ground, existing improvements, or new improvements. The Contractor shall make its own determination in this regard.
3.11 COMPACTION OF BACKFILL MATERIALS
A. Each layer of backfill material as defined herein, shall be mechanically compacted to the specified percentage of maximum density. Equipment that is consistently capable of achieving the required degree of compaction shall be used and each layer shall be compacted over its entire area while the material is at the required moisture content range.
B. Flooding, ponding, or jetting shall not be used.
C. Equipment weighing more than 10,000 pounds shall not be used closer to structure walls than a horizontal distance equal to the depth of the fill against the structure wall at that time. Hand operated power compaction equipment shall be used where use of heavier equipment is impractical or restricted due to weight limitations.
D. Trench Backfill Requirements: Per City standards.
E. Compaction Requirements for Trench Bedding: Per City standards.
F. Compaction Requirements for Pipe Zone: Contractor shall conduct compaction testing, at a minimum, as follows for Pipe Zone. Additional tests will be required depending on test results and field conditions.
1. Contractor shall demonstrate successful means and methods to meet compaction required.
2. Passing tests are required at one every 300 linear feet of trench.
3.12 SOIL STABILIZATION
A. The Contractor shall install soil stabilization materials to stabilize excavations
8.k
August 12, 2024
Packet Pg. 369
Technical Specifications Highlands Park Path Project C1811 TP - 107
where not completely and continuously shored.
B. Additional stabilization of existing utility trench backfill and bedding materials via permeation grouting is required to prevent raveling of materia ls during excavation operations including coarse, granular, non-cohesive trench backfill and pipe embedment materials.
C. Utilities parallel to new sewer or storm drain mains:
1. Minimum limits of grouting shall be per the following:
a. Where separation is less than 4 feet.
b. Vertical limits shall apply to any areas disturbed by excavation and as directed by the Engineer.
D. Utilities crossing new sewer or storm drain main:
1. Minimum limits of grouting shall be per the following:
a. 2 feet beyond edge of existing utility.
b. Vertical limits shall apply to any areas disturbed by excavation and as shown directed by the Engineer.
E. For utilities not shown on the Plans, the minimum limits described for existing utilities parallel to or crossing the new sewer main shall apply.
F. The Contractor shall submit a soil stabilization plan for review.
G. Existing gravity utilities shall be protected from grout intrusion into the utility. To protect City storm drains and existing sewers to remain in service against damage from grouting, such utilities shall be inspected using CCTV after soil stabilization to determine whether grout has penetrated the gravity utility. If grout is found in the utility, Contractor shall remove all grout and re-inspect said utility to demonstra te grout removal, at no additional cost to the owner. If desired, Contractor shall be allowed to inspect the existing gravity utilities prior to grouting to establish existing condition and at no additional cost to the City.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 370
Technical Specifications Highlands Park Path Project C1811 TP - 108
SECTION 332520 RIP RAP
1.1 DESCRIPTION
A. This work shall be done in accordance with Section 72-2, Rock Slope Protection, of the State Standard Specifications, these Special Provisions, and as directed by the Engineer. Riprap shall consist of durable rock, free from cracks and seams complying with Caltrans Standard Specifications Section 72-
2. 1.2 ROCK
A. Rock riprap must comply with the testing and corresponding specifications in section 72-2.02B Rock of the State Standard Specifications. The breadth and thickness of each piece of riprap shall be at least one third its length.
B. Rocks size shall be per the table for Rock Gradation for Method B Placement; Class Light.
1.3 PERMEABLE MATERIAL
A. Permeable material shall conform to the provisions of Section 68-2.02F, "Permeable Material," of the Standard Specifications. The permeable material shall conform to the grading requirements for Class 2, permeable material and must consist of washed angular crushed stone.
1.4 FILTER FABRIC
A. Filter fabric shall conform to the provisions of Section 96 Geosynthetics of the Standard Specifications. Filter fabric shall be Mirafi 600X or approved equal.
1.5 CONSTRUCTION
A. The rock riprap slope protection shall be constructed per the specifications in Section 72-2.03 Construction of the State Standard Specifications and per the details, lines and grades shown on the plans.
B. Earthwork must comply with Section 19 Earthwork State Standard Specifications.
C. Install rock slope protection fabric in conformance with Section 72-1.03 of the State Standard Specifications. Place rock slope protection fabric loosely upon or against the surface to receive the fabric so that the fabric conforms to the surface without damage when the cover material is placed.
D. Hand place the riprap in a manner that will produce a reasonably well graded mass of rock with the minimum practicable percentage of voids. The desired distribution of the various sizes of rocks throughout the mass shall be obtained by selective loading of the material at the source. The riprap shall be placed in
8.k
August 12, 2024
Packet Pg. 371
Technical Specifications Highlands Park Path Project C1811 TP - 109
layers to allow for the placement of the topsoil to fill the voids. The finished riprap will be free of pockets of smaller stones and clusters of larger stones. The placed rock shall be tamped into place using a steel plate to form a regular well organized surface.
E. Once the rock riprap and topsoil is placed, the voids of the soil-rock riprap shall be planted with willow poles, blackberry plants and a native grass seed mix.
The willow poles shall be planted to a minimum depth of 12 into the native subgrade soil as shown on the plans.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 372
Technical Specifications Highlands Park Path Project C1811 TP - 110
SECTION 332538 PRECAST CONCRETE STORM DRAIN STRUCTURES PART 1 GENERAL
1.1 THE REQUIREMENT
A. The Contractor shall provide all materials, equipment, and labor to furnish and install all manholes, catch basins, headwalls, complete with frame, cover, pipe connections, and all other appurtenances complete in place, as shown on the Drawings and as specified herein.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Section 332315 Excavation and Backfill
B. Section 333600 - Grout.
1.3 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Commercial Standards:
ASTM A 48 Specification for Gray Iron Castings
ASTM C 150 Specification for Portland Cement.
ASTM C 478 Specification for Precast Reinforced Concrete Manhole Sections.
1.4 CONTRACTOR SUBMITTALS
A. Certificates of Compliance: Certificates of Compliance shall be provided for all products and materials proposed to be used under this Section.
PART 2 PRODUCTS
2.1 MATERIALS
A. Manholes: Manholes shall be constructed of concentric precast reinforced concrete sections in accordance with ASTM C 478 and City of San Carlos Standard Detail No.11. Manhole base shall be Cast-In-Place unless specifically indicated in the contract documents an d drawings or directed by the City Engineer. Concrete for manhole base shall be 6 sack with a 4,000 psi rating. Manhole sections shall be precast concr ete units conforming to Section 70-4, "Precast Concrete Pipe Drainage Facil ities", of the State Specifications, and constructed in accordance with applicable City Standard Drawings.
B. Precast concrete sections shall be manufactured by a process that will produce
8.k
August 12, 2024
Packet Pg. 373
Technical Specifications Highlands Park Path Project C1811 TP - 111
a dense, homogeneous concrete section of first quality. Steps or rungs shall not be allowed in manholes. The sections shall have a minimum wall thickness of 5 inches for 48-inch diameter sections, a minimum wall thickness of 6 inches for 60-inch diameter sections and a minimum of 7-inches for 72-inch diameter sections.
C. Cement used in manufacturing the sections for storm drain manholes shall be Type V portland cement as specified in ASTM C 150. Storm drain precast manhole sections shall be jointed by sealing compounds like "RAM-NEK" or "ADEKA ULTRA SEAL". Manhole sections shall be sealed using preformed joint material and grout as specified in Section 333600, "Grout." All manholes shall have formed channels with inverts to match th e adjoining pipes.
Manhole sections shall be designed for a minimum of HS-20 traffic loading plus earth loads. Calculate earth load with a unit weight of 130 pounds per cubic foot.
D. Manhole and Junction Structure Frame and Cover: Manhole frames and covers shall be Phoenix Model P-1090, as manufactured by Phoenix Iron Works, Second and Castro Streets, Oakland, California 94604, or approved equal, and stamped "STORM DRAIN, and shall conform to the City of San Carlos Standards.
E. Water Stops: Plastic pipe connections to precast concrete manholes and junction structures and cast-in-place bases shall also be sealed using a premolded elastomeric waterstop material.
F. Manhole Seals: The Contractor shall provide external joint seals and riser seals for all manholes, in addition to the preformed plastic sealing gaskets used between each barrel, cone or grade ring section. External joint seals for the barrel and cone sections shall be an external rubber sleeve, Infi-Shield Seal Wrap, or equal. The seal shall be made of ethylene propylene diene monomer (EPDM) rubber with a maximum thickness of 60 mils. Each unit shall have a 2-inch wide mastic strip on the top and bottom edge of the rubber wrap. The mastic shall be non-hardening butyl rubber sealant, with a minimum thickness of 1/4 inch. The seal shall be designed to prevent leakage of water into the manhole.
G. Cement mortar composed of 1 part Portland Cement and 2 parts sand by volume and shall conform to SS Section 65-2.02E, "Joints.
H. Standard Catch Basin and cover: Frames and grates for catch basins shall be fabricated from structural steel conforming to ASTM A36, galvanized, and in accordance with SS Section 75-2.02B, "Frames, Grates, and Covers", and in accordance with City of San Carlos Standard Details. Upon completion, in accordance with City Standards, curbs adjacent to the catch basin shall be labeled with "No Dumping, Flows to Ocean/Bay".
PART 3 EXECUTION
3.1 INSTALLATION
8.k
August 12, 2024
Packet Pg. 374
Technical Specifications Highlands Park Path Project C1811 TP - 112
A. All precast concrete structures shall be installed in strict conformance with the City standard specifications and manufacturer's printed instructions on a well- compacted foundation as specified in Section 332315, "Excavation and Backfill." B. The street cut in asphalt concrete pavement shall be circular and paving around the manhole shall be in accordance with the Drawings. Openings in manholes shall be protected from construction loads, debris, and unauthorized entry.
C. Manhole sections shall be set so as to be vertical with sections in true alignment.
The joint of the previously set section shall be clean and covered with preformed joint sealant before the next section is placed. The joint material shall be installed in accordance with manufacturer's printed recommendations. Vertical walls for storm drain junction structures shall not be segmented.
D. No pipe ends shall protrude into the manhole or junction structure. No bell section of the pipe shall be placed into the manhole or junction structure wall.
E. Connections to existing storm drain structures shall be made with care to avoid any damage to any existing curb and gutter or sidewalk. Any damaged section shall be removed and replaced in accordance with City Standards. Pipe connections to the existing structures shall be sealed with cement mortar.
F. Structure backfill and compaction shall be as specified in Section 332315, "Excavation and Backfill."
3.2 TESTING
A. Testing shall be performed in compliance with manufacturer recommendations and requirements of City Specifications. The Contractor shall make all repairs necessary to achieve compliance and to the satisfaction of the City, at no additional cost to the City.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 375
Technical Specifications Highlands Park Path Project C1811 TP - 113
SECTION 332655 STORM DRAIN PIPING
PART 1 GENERAL
1.1 THE REQUIREMENT
A. The Contractor shall provide all materials, equipment, and labor to furnish and install all storm drain piping, of the various types and sizes, complete in place as shown on the Drawings and as specified herein.
1.2 RELATED SECTIONS
A. Section 013300, Contractor Submittals
B. Section 332315, Excavation and Backfill
C. Section 332538, Precast Concrete Storm Drain Structures
1.3 REFERENCES
A. The following is a list of standards that may be referenced in this Section and any supplemental Data Sheets:
1. American Society for Testing and Materials (ASTM):
a. C76, Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe.
b. C150, Specification for Portland Cement.
c. C361, Specification for Reinforce Concrete Low-Head Pressure Pipe.
d. C507, Specification for Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe.
e. D412, Test Methods for Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers - Tension.
f. D2240, Test Method for Rubber Property Durometer Hardness. g. D2321, Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications.
2. American Concrete Pipe Association
1.4 CONTRACTOR SUBMITTALS
A. Submittals shall be in accordance with Section 013300, Contractor Submittals.
B. Complete data on pipe, fittings, linings, coatings, and manufacturer's installation instructions.
C. Certifications properly executed by the manufacturer shall be submitted to the Engineer showing compliance to the requirements of the Specifications. Test data on tests performed shall be provided as requested by the Engineer.
8.k
August 12, 2024
Packet Pg. 376
Technical Specifications Highlands Park Path Project C1811 TP - 114
D. The Contractor shall furnish the results of all tests as specified in ASTM C76 and as indicated herein.
E. A certified affidavit of compliance for all pipe and other products or materials furnished under this Section as specified in the reference standards.
PART 2 PRODUCTS
2.1 PIPE AND FITTINGS
A. High Density Polyethylene Pipe
1. The High Density Polyethylene Pipe (HDPE) pipe material shall be manufactured from a polyethylene compound that conforms to ASTM D-1248. Pipe shall be polyethylene (PE 3608) plastic solid wall pipe as specified below.
Property ASTM Standard Value
Density (Black) D792 0.955 g/cc
High Load Melt Index D1238 8.75 g/10 min
Tensile Strength @ Yield (2 in/min) D638 3,500 psi
Tensile Strength @ Break (2 in/min) D638 5,000 psi
Elongation @ Break (2 in/min) D638 >800%
Hydrostatic Design Basis, 73.4° F (23° C ) D2837 1,600 psi Hydrostatic Design Basis, 140° F (60° C ) D2837 800 psi Flexural Modulus D790 140,000 psi
Hardness (Shore D) D2240 66
Brittleness Temperature D746 <-150° F
ESCR Condition C (100% Igepal F50) D1693 >5,000 hrs
Slow Crack Growth PENT at 2.4 Mpa and 80° C D1473 150 hrs NSF Standard 61 Approved
Cell Classification D3350 345464C**
2. All HDPE pipe shall be SDR 17 with a minimum pressure rating of 100 psi. Pipe joining shall be accomplished by thermal butt fusion performed in accordance with the pipe manufacturers recommendations and in accordance with the applicable sections of ASTM D-2657.
3. All appurtenances (fittings, couplers, etc.) shall be included.
B. High Density Polyethylene Pipe Joints
1. All joints of HDPE pipe shall be heat fused in strict accordance with the pipe manufacturers recommendations. Heat fusion shall only be performed by technicians who have been certified by the pipe manufacturer or supplier and who have a minimum of three (3) years of experience fusion welding 4-inch or larger diameter HDPE pipelines. Electrofusion couplings may also be used to fuse HDPE pipe sections. Internal beads shall be removed.
8.k
August 12, 2024
Packet Pg. 377
Technical Specifications Highlands Park Path Project C1811 TP - 115
C. PLASTIC PIPE
1. Polyvinyl chloride (PVC) of the types and classifications shown on the plans and shall conform to applicable requirements of ASTM D 2241, ASTM D 2672, and ASTM D 3139.
2. Plastic pipe shall be PVC C900 Class 150.
3. Each pipe and fitting shall be marked at the plant. Marking shall include size or diameter and class of pipe or fittings, manufacturers identification, and date of manufacture, plus other information required for each type of pipe.
D. Pipe Zone Backfill Material:
1. Pipe zone materials shall conform to Section 332315, "Excavation and Backfill." E. Trench Backfill above Pipe Zone:
1. Trench backfill materials above the pipe zone shall conform to Section 332315, "Excavation and Backfill."
2.2 MARKING AT PLANT
A. Each pipe and fitting shall be marked at the plant. Marking shall include size or diameter and class of pipe or fittings, manufacturers identification, and date of manufacture, plus other information required for each type of pipe.
2.3 WARNING TAPE AND TRACER WIRE
A. Installation shall be in accordance with City Standard Drawings.
B. Warning Tape shall be 3-inch wide Green color for with an overall minimum thickness of 6 mil and a solid aluminum foil core with minimum thickness of 3 mil.
The solid foil core shall be encased between two clear layers of 100% virgin polypropylene or polyethylene film. Warning Tape shall be permanently printed on both sides with a repeating warning Caution: STORM PIPE BELOW at maximum interval of 2 feet. Warning Tape shall be placed 1 foot above the top of pipe.
C. Tracer wire shall be 8 AWG Solid Copper conductor with a 45 mil thick, high density, high molecular weight polyethylene (HDPE) insulation and rated for 600 volts. Insulation shall be RoHS compliant and utilize virgin grade material. Jacket shall be Green color for storm drain utilities application. Tracer wire should be placed in the same orientation to all installed pipe, and taped to the pipe using a spacer every 8-10 feet on top of the pipe.
PART 3 EXECUTION
3.1 DISTRIBUTING MATERIALS
8.k
August 12, 2024
Packet Pg. 378
Technical Specifications Highlands Park Path Project C1811 TP - 116
A. Store materials in a manner that will not be a hazard to traffic or to the public in general, will not obstruct access to adjacent property, or will not obstruct other contractors working in the area.
3.2 HANDLING AND TRANSPORTATION
A. During loading, transportation, unloading, storage, and laying, every precaution shall be taken to prevent damage to the pipe, linings, and coatings. Trucks, trailers, or railway cars used for transporting coated pipe shall be provided with bolsters between each layer of pipe curved to fit the outside of the pipe.
B. Lifting of pipe during unloading shall be done using two slings placed at the quarter points of the pipe sections. Pipe may be lifted into the trench using one sling near the center of the pipe, provided the pipe is guided to prevent uncontrolled swinging and no damage will result to the pipe or harm to the workmen. The slings shall bear uniformly against the pipe. When not being handled, the pipe shall be supported on timber cradles or on properly prepared ground, graded to eliminate all rock points and to provide uniform support along the full length. If any unit of pipe is, in the opinion of the Engineer, damaged beyond repair, it shall be removed from the site of the Work and replaced with another unit. Position slings away from joints.
C. Pipe and fittings shall not be stored on rocks or gravel, or other hard material that might damage the pipe or lining and coating. No pipe shall be allowed to rest on the bell end of the pipe or pipe joint. This shall include storage areas and along the pipe trench.
D. Heavy canvas or nylon slings of suitable strength shall be used for lifting and supporting materials; do not use chains or cables.
3.3 RUBBER GASKET STORAGE
A. Store all rubber gaskets in a cool, well-ventilated place and do not expose to the direct rays of the sun. Do not allow contact with oils, fuels, petroleum, or solvents.
3.4 PIPE PREPARATION AND HANDLING
A. Each pipe and fitting shall be carefully inspected before installation. The interior and exterior shall be inspected, and all damaged areas patched in the field with material equal to the original. Any pipe or coating system that is, in the opinion of the Engineer, damaged beyond repair, shall not be used and shall be removed from the site. Clean ends of pipe thoroughly. Remove foreign matter and dirt from inside of pipe and keep clean during and after installation.
B. Use proper implements, tools, and facilities for the safe and proper protection and installation of the pipe. Carefully handle pipe in such a manner as to avoid any physical damage to the pipe. Do not drop or dump pipe into trenches under any
8.k
August 12, 2024
Packet Pg. 379
Technical Specifications Highlands Park Path Project C1811 TP - 117
circumstances.
3.5 PREPARATION OF TRENCH
A. Line and Grade for Main:
1. For pipelines intended to be straight, do not deviate more than 1/2 inch from line or 1/4 inch from grade, provided that finished pipeline will present a uniform bore, and such variation does not result in a level or reverse sloping invert, or less than minimum slope. Measure for grade at the pipe invert, not at the top of the pipe.
2. Grade the bottom of the trench by hand to the line and grade to which the pipe is to be laid, with proper allowance for pipe thickness and pipe base.
Remove hard spots that would prevent a uniform thickness of bedding.
Before laying each section of the pipe, check the grade with a straightedge and correct any irregularities found. The trench bottom shall form a continuous and uniform bearing and support for the pipe barrel between bell holes.
3. Bedding material under the pipe shall be compacted in 8-inch maximum lifts to the required minimum compacted required in Section 332315, "Excavation and Backfill." If, during pipe installation, a pipe section is found to be at an incorrect grade, the section shall be removed and the base regraded to the proper elevation.
B. Bell (Joint) Holes: At the location of each joint, dig bell (joint) holes of ample dimensions in the bottom of the trench and at the sides as required to permit the joint to be made properly, and to permit easy visual inspection of the entire joint and checking the gasket with a feeler gauge.
C. Removal of Water: The trench shall be kept dry until the pipe laying is completed and the pipe zone material is installed.
3.6 PREPARING PIPE FOR TRENCH
A. Inspect each pipe and fitting before the pipe and/or fitting is lowered into the trench.
B. Damaged portions of pipe, coating, or lining shall be cleaned and repaired by experienced personnel, so that the pipe is equal to the original. Manufacturer's recommendations for repairs shall be followed.
C. Wipe the joints of pipe, fittings, and appurtenances clean of all dirt, grease, and foreign matter before the pipe is lowered into trench.
D. Plug or close off pipes that are stubbed off for access structures (such as manholes) for connection by others with temporary, watertight plugs.
3.7 LAYING PIPE
8.k
August 12, 2024
Packet Pg. 380
Technical Specifications Highlands Park Path Project C1811 TP - 118
A. Pipe laying shall proceed upgrade, with spigot ends pointing in the direction of flow.
B. All pipe, fittings, and appurtenances shall be installed in accordance with the manufacturer's instructions and these Specifications.
C. No pipe shall be laid in water or when, in the opinion of the Engineer, trench conditions are unsuitable.
1. Joining Pipe: Assemble joint in accordance with manufacturer's instructions.
D. Prevent foreign material from entering the pipe while it is being placed in the trench. Remove all foreign material from the pipe and spigot area before the next pipe is placed. If the pipe laying crew cannot put the pipe into the trench and in place without getting earth into the pipe, the Engineer may require that snugly fitted, tightly woven, canvas bags be placed over each end before lowering the pipe. The bags shall be left in place until the connection is to be made to the adjacent pipe. During laying operations, keep debris, tools, clothing, or other materials out of the pipe.
E. Take all precautions necessary to prevent the "uplift" or floating of the line prior to completion of backfilling operations.
3.8 PERMISSIBLE DEFLECTION AT JOINTS
A. Deflection of pipe joints is not permitted without prior written approval of the Engineer. Where it is approved by the Engineer to deflect pipe from a straight line, either in the vertical or horizontal plane, do not exceed 50 percent of the amount of deflection recommended by the pipe or coupling manufacturer and as reviewed by the Engineer.
3.9 PIPE ZONE MATERIAL
A. Particular attention must be given to the area of the pipe zone from the flow line to the centerline of the pipe to ensure that firm support is obtained to prevent any lateral movement of the pipe during the final backfilling of the pipe zone.
3.10 STORM DRAIN CLEANING
A. Prior to final acceptance remove all accumulated construction debris, rocks, gravel, sand, silt, and other foreign material from the system at or near the closest downstream manhole. If necessary, use mechanical rodding or bucketing equipment. The Contractor shall provide CCTV reports and videotape depicting the condition of the newly installed pipe.
B. Upon Engineer's final manhole-to-manhole (structure-to-structure) inspection of the system, if any foreign matter is still present in the system, re-flush and clean
8.k
August 12, 2024
Packet Pg. 381
Technical Specifications Highlands Park Path Project C1811 TP - 119
the sections and portions of the lines as required.
C. No separate or direct payment will be made for the work covered under this section of the specifications, and all costs in connection therewith will be considered a subsidiary obligation of the Contractor.
3.11 TESTING
A. The Contractor shall perform a video inspection of the piping system and shall furnish the City with a copy of the video.
B. The Contractor shall have all storm drain lines cleared by either mechanical or hydraulic balling before a video inspection is performed. A screen trap shall be installed at the downstream manhole of the line to be cleared to prevent debris from entering existing mains.
C. The Contractor shall pay for all associated testing costs.
D. All defects and leaks noted shall be corrected by the Contractor to the satisfaction of the Engineer, at no additional cost to the City.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 382
Technical Specifications Highlands Park Path Project C1811 TP - 120
SECTION 333600 GROUT
PART 1 GENERAL
1.1 THE REQUIREMENT
A. The CONTRACTOR shall provide all materials, equipment, and labor necessary to furnish and place grout and shall form, mix, place, cure, repair, finish, and do all other work as necessary to produce finished grout as shown on the Drawings and as specified herein.
B. The following types of grout shall be covered in this Section:
1. Non-Shrink Grout: Non-Shrink grout is to be used unless another type is specifically referenced or as shown on the Drawings.
2. Epoxy Grout
3. Cement Grout
4. Flowable Cement Grout
5. Low Viscosity (Permeation) Grout and Fast Setting Injected Grout
6. Polymer Grout
7. Neat Cement Grout
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Section 013300 Contractor Submittals
B. Section 015600 Protection of Existing Facilities
C. Section 332315 Excavation and Backfill
D. Section 332538 Precast Storm Drain Concrete Structures E. Division 1 General Requirements.
1.3 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. Commercial Standards:
ASTM C109 Test Method for Compressive Strength of
Hydraulic Cement Mortars (Using 2-In. or
50-mm Cube Specimens).
ASTM C531 Test Method for Linear Shrinkage and
Coefficient of Thermal Expansion of
Chemical-Resistant Mortars, Grouts, and
Monolithic Surfacings.
ASTM C579 Test Methods for Compressive Strength of
Chemical- Resistant Mortars, Grouts, and
Monolithic Surfacings.
ASTM C827 Test Method for Change in Height of Early
8.k
August 12, 2024
Packet Pg. 383
Technical Specifications Highlands Park Path Project C1811 TP - 121
Ages of Cylindrical Specimens from
Cementitious Mixtures.
ASTM D696 Test Method for Coefficient of Linear
Thermal Expansion of Plastics.
CRD-C 621 Corps of Engineers Specification for Non-shrink Grout.
1.4 CONTRACTOR SUBMITTALS
A. Certificates of Compliance: Certificates of Compliance shall be provided for all products and materials proposed to be used under this Section.
PART 2 PRODUCTS
2.1 PREPACKAGED GROUTS
A. Non-Shrink Grout:
1. Non-shrink grout shall be a prepackaged, inorganic, non-gas- liberating, non- metallic, cement-based grout requiring only the addition of water. Manufacturer's instructions shall be printed on each bag or other container in which the materials are packaged. The specific formulation for each class of non-shrink grout specified herein shall be that recommended by the manufacturer for the particular application.
2. Class A non-shrink grouts shall have a minimum 28-day compressive strength of 5,000 psi; shall have no shrinkage (zero percent) and a maximum 4.0 percent expansion in the plastic state when tested in accordance with ASTM C 827; and shall have no shrinkage (zero percent) and a maximum of 0.2-percent expansion in the hardened state when tested in accordance with CRD C 621.
3. Class B non-shrink grouts shall have a minimum 28-day compressive strength of 5,000 psi and shall meet the requirements of CRD C 621.
4. Application:
a. Class A non-shrink grout shall be used for the repair of all holes and defects in concrete members which are water bearing or in contact with soil or other fill material, grouting under all equipment base plates, and at all locations where grout is specified; except, for those applications for Class B non-shrink grout and epoxy grout specified herein. Class A non-shrink grout may be used in place of Class B non-shrink grout for all applications. Apply Class A grout to annular spaces, specifically where PVC sanitary sewer connects to pre-cast manholes. b. Class B non-shrink grout shall be used for the repair of all holes and defects in concrete members which are not water-bearing and not in contact with soil or other fill material.
B. Epoxy Grout:
1. Epoxy grout shall be a pourable, non-shrink, 100-percent solids system. The epoxy grout system shall have 3 components: resin, hardener, and specially blended aggregate, all premeasured and prepackaged. The resin component shall not contain any non-reactive
8.k
August 12, 2024
Packet Pg. 384
Technical Specifications Highlands Park Path Project C1811 TP - 122
diluents. Resins containing butyl glycidyl ether (BGE) or other highly volatile and hazardous reactive diluents are not acceptable. Variation of component ratios is not permitted unless specifically recommended by the manufacturer. Manufacturer's instructions shall be printed on each container in which the materials are packaged.
2. The chemical formulation of the epoxy grout shall be that recommended by the manufacturer for the particular application.
3. The mixed epoxy grout system shall have a minimum working life of 45 minutes at 75 degrees F.
4. The epoxy grout shall develop a compressive strength of 5,000 psi in 24 hours and 10,000 psi in 7 days when tested in accordance with ASTM C 579, Method
B. There shall be no shrinkage (zero percent) and a maximum 4.0 percent expansion when tested in accordance with ASTM C 827.
5. Application: Epoxy grout shall be used to embed all anchor bolts and reinforcing steel required to be set in grout, and for all other specified applications.
2.2 CEMENT GROUT
A. Cement Grout: Cement grout shall be composed of one part cement, 3 parts sand, and the minimum amount of water necessary to obtain the desired consistency. Where needed to match the color of adjacent concrete, white portland cement shall be blended with regular cement as needed. The minimum compressive strength at 28 days shall be 4,000 psi.
B. Cement shall be as specified in Section 02537, Precast Concrete Manholes. C. Cement Grout shall not be used as Contact Grout for filling voids created during a tunnel or shaft excavation.
2.3 FLOWABLE CEMENT GROUT
A. Flowable Cement Grout: Minimum penetration resistance of 10 psi in 24 hours when tested in accordance with ASTM C403 and a 28-day unconfined compressive strength of 45-165 psi.
B. Application:
1. Void spaces between the earth and the casing pipe.
2. Interstitial space between the casing pipe and carrier pipe.
2.4 LOW VISCOSITY (PERMEATION) GROUT AND FAST SETTING INJECTED GROUT
A. Low viscosity grout shall be injected to provide stabilization for the following conditions:
1. Stabilize existing utility pipelines during trenching and excavation activities to prevent destabilization of materials when exposed in vertical excavations.
2. Stabilize materials that would be subject to vibration densification during nearby sheet pile driving or construction activity.
3. Prevent porous and permeable materials from transmitting perched
8.k
August 12, 2024
Packet Pg. 385
Technical Specifications Highlands Park Path Project C1811 TP - 123
groundwater into project excavations.
B. The low viscosity grout shall consist of Portland cement, water and fluidizer additives.
C. Grouting should completely bind the granular material into a single coherent grouted mass (grouted prism).
D. Grout batch records shall include time of mix, amount and type of components used, and anticipated set times.
E. Fast Setting Injected Grout shall be used in establishing bulkheads to limit the spread/flow of low viscosity grout. Mix according to the following proportions:
1. Component A:
a. Portland Cement Type I-II 8 sacks @ 94 lbs. per
sack
b. Bentonite suspending agent 0-50 lbs.
c. PGA expansion agent 0-3 lbs.
2. Component B:
a. Sodium silicate 40 gallons
b. Water
2.5 NEAT CEMENT GROUT
A. Application: Use for dewatering well abandonment.
B. Mix according to the following ratio:
1. 94 lbs. Portland Type II cement.
2. 5 gallons clean water.
3. Up to 5% bentonite powder or chips.
2.6 PRESSURE GROUTING EQUIPMENT
A. Pressure grouting equipment shall include a mixer and holdover agitator tanks.
Gages shall be provided to indicate pressure used. The mixer shall be provided with a meter capable of indicating to one-tenth of a cubic foot the volume of grout used. The grout pump shall be capable of pumping low viscosity grout.
2.7 CONSISTENCY
A. The consistency of grouts shall be that necessary to completely fill the space to be grouted for the particular application. Dry pack consistency is such that the grout is plastic and moldable but will not flow. Where "dry pack" is specified, it shall mean a grout of that consistency; the type of grout to be used shall be as specified herein for the particular application.
2.8 MEASUREMENT OF INGREDIENTS
A. Measurements for cement grout shall be made accurately by volume using appropriate containers. Shovel measurement will not be allowed.
8.k
August 12, 2024
Packet Pg. 386
Technical Specifications Highlands Park Path Project C1811 TP - 124
B. Prepackaged grouts shall have ingredients measured by means recommended by the manufacturer.
PART 3 EXECUTION
3.1 GENERAL
A. All surface preparation, curing, and protection of cement grout shall be as specified in Section 332538, Precast Concrete Storm Drain Structures. The finish of the grout surface shall match that of the adjacent concrete.
B. The manufacturer of Class A non-shrink grout and epoxy grout shall provide on-site technical assistance upon request.
C. All mixing, surface preparation, handling, placing, consolidation and other means of execution for prepackaged grouts shall be done according to the printed instructions and recommendations of the manufacturer.
3.2 CONSOLIDATION
A. Grout shall be placed in such a manner, for the consistency necessary for each application, so as to assure that the space to be grouted is completely filled.
3.3 APPLICATION
A. Prior to placement of any subsurface grout, Contractor shall notify USA to mark subscribing subsurface utilities in the vicinity of planned excavations and grouting. Use project drawings and make detailed site inspections to locate existing subsurface utilities prior to beginning grouting/excavation operations.
B. Grouting is to be done prior to shoring installation and prior to any dewatering.
C. Grout mix shall be designed and injected at pressures that will not damage adjacent utilities. No heave of ground surface shall be allowed and all existing utilities, pipelines, and structures shall be protected from damage during application and curing of grout. Install temporary elevation benchmarks in grouting areas and at suitable distances outside of grouting areas to provide reference checks against existing elevations. Monitor elevations of existing improvements including utilities during all grouting operations and maintain daily logs of cumulative changes in benchmark elevations.
D. Provide constant monitoring of existing gravity utilities to verify no inflow of grout during grout pumping operations. Immediately cease grout pumping if intrusion occurs. Contractor is responsible to remove grout from any affected utilities.
E. Notify the City immediately if elevation changes greater than 0.25-inches occur and immediately cease all work in and around the affected area. Revise and resubmit grouting plan for review by the Engineer prior to continuation of work in the affected area.
F. Pump grout through grout injection casings until grout returns are noted in the
8.k
August 12, 2024
Packet Pg. 387
Technical Specifications Highlands Park Path Project C1811 TP - 125
next adjacent pre-drilled/drive grout injection casing.
G. Coordinate grout injection pressures (always to be less than pressures that could damage existing utilities), grout fluidity/set times and grout injection casing layout dimensions.
H. Maintain daily log of grouting operations including grout injection casing number, location, grouting pressure and rate, stage depth and grout quantity and batch used.
I. Samples shall be taken from each batch mixed and properly identified, stored and tested to verify that compressive strength is with specified range.
J. During and upon completion of grouting, the work area shall be cleaned and restored to original condition including adequate disposal of all generated waste and wastewater.
K. Repair the top of each grout injection hole to match existing pavement grade.
END OF SECTION
8.k
August 12, 2024
Packet Pg. 388
THIS PAGE INTENTIONALLY LEFT BLANK
8.k
August 12, 2024
Packet Pg. 389
CITY COUNCIL
STAFF REPORT
MEETING DATE: August 12, 2024
ITEM TITLE: Adopt Ordinance 1618 Adopting a Zoning District Boundary Map Amendment to Allow Prezoning of the Property to RS3: Single Family, Low Density for the Property Located at 244 Club Drive (APN: 049- 050-070).
RECOMMENDATION:
Adopt Ordinance 1618 to amend the Zoning District Map to a zoning designation of RS-3: Single Family, Low Density (3 DU/Acre) to allow for the prezoning and annexation at 244 Club Drive, Assessor’s Parcel Number 049-050-070.
FISCAL IMPLICATIONS:
The costs to process the proposed annexation are paid for by the applicant. The Fiscal Impact Analysis (FIA) prepared by Economic & Planning Systems, Inc. (EPS) concludes the annual net fiscal impact of the annexation would be roughly neutral. No additional appropriation is needed at this time.
BACKGROUND:
During the June 24, 2024 City Council meeting, the Council introduced the ordinance to amend the Zoning District Map to facilitate the prezoning and annexation of one developed, single-family parcel at 244 Club Drive. The Council also adopted resolutions for a General Plan Map Amendment and to authorize a property tax exchange between the City and County of San Mateo.
The Planning and Transportation Commission previously conducted a public hearing on April 1, 2024 and adopted two resolutions recommending City Council approval of a General Plan Map Amendment and a Zoning District Boundary Map Amendment.
ANALYSIS:
The project site at 244 Club Drive contains one developed parcel that is located in the County of San Mateo adjacent to the City’s northwestern boundary. While not within the City jurisdictional boundary, the site is located within the Local Agency Formation Commission (LAFCo) adopted Sphere of Influence (SOI) of San Carlos. The City is required to process applications for annexation within its SOI. If the application meets the City’s General Plan policies and is within the City’s SOI as outlined by LAFCo for annexation, the property could be prezoned for annexation.
8.l
August 12, 2024
Packet Pg. 390
Zoning District Boundary Map Amendment
Chapter 18.38 “Prezoning and Annexation Procedure” of the Zoning Ordinance outlines the procedure for prezoning and criteria for annexation of unincorporated territory. Further, the Zoning Ordinance specifies that such requests shall be processed in accordance with the procedures of Chapter 18.35 “Amendments to the Zoning Ordinance and Map”. An analysis of the project’s ability to comply with both the Zoning District Boundary Map Amendment findings and criteria established in the Prezoning and Annexation Ordinance is required. The findings recommended by the Planning and Transportation Commission are embedded in the Ordinance of the City Council (Attachment 1).
Environmental Determination
This project has been determined to be exempt from the provisions of the California Environmental Quality Act (CEQA) per Section 15319 Annexation of Existing Facilities and Lots for Exempt Facilities and Section 15303 New Construction or Conversion of Small Structures.
Next Steps
Should the City Council adopt Ordinance 1615 at its August 12, 2024 regular meeting, the proposed amendment would become effective on September 11, 2024.
ALTERNATIVES:
The alternatives available to the City Council include:
1. Adopt Ordinance 1618 to amend the Zoning District Boundary Map to RS-3: Single Family, Low Density to allow for the prezoning and annexation of the property located at 244 Club Drive (APN: 049-050-070); or
2. Do not adopt Ordinance 1618; or
3. Provide staff with alternative direction.
Respectfully submitted by:
Al Savay, Community Development Director
Approved for submission by:
_______________________
Jeff Maltbie, City Manager
ATTACHMENT(S):
1. Ordinance 1618 with Exhibits A & B
8.l
August 12, 2024
Packet Pg. 391
2 6
4 4
ORDINANCE NO. 1618
AN ORDINANCE OF THE CITY OF SAN CARLOS ADOPTING A ZONING DISTRICT
BOUNDARY MAP AMENDMENT TO ALLOW PREZONING OF THE PROPERTY TO RS-3: SINGLE FAMILY, LOW DENSITY FOR THE PROPERTY LOCATED AT 244 CLUB DRIVE (APN: 049-050-070).
______________________________________________________________ The City Council of the City of San Carlos does ordain as follows:
SECTION 1:
WHEREAS, the San Carlos City Council has received an application from the property owners of 244 Club Drive (APN: 049-050-070) for a Zoning District Boundary Map Amendment to allow for a prezoning designation of RS-3: Single Family, Low Density as initial steps to annexation of the subject property from the County of San Mateo into the City of San Carlos; and WHEREAS, the San Carlos City Council has received an associated application from the aforementioned property for a General Plan Amendment to a land use designation of Single Family, Low Density (3 DUs/Acre); and
WHEREAS, it is determined that the aforementioned property is located within the Local Agency Formation Commission (LAFCo) adopted sphere of influence (SOI) of San Carlos; and WHEREAS, in accordance with the California Environmental Quality Act (CEQA), the City Council has determined that the application for a General Plan Map Amendment and associated Zoning District Boundary (Map) Amendment for the aforementioned properties is exempt from the provisions of CEQA pursuant to Section 15319 Annexation of Existing Facilities and Lots for Exempt Facilities and Section 15303 New Construction or Conversion of Small Structures; and WHEREAS, on April 1, 2024 the San Carlos Planning and Transportation Commission (PTC) conducted a public hearing for consideration of a Zoning District Boundary Map Amendment and Prezoning and Annexation for the aforementioned property to RS-3: Single Family, Low Density in consideration of a recommendation to the City Council regarding adoption of an Ordinance; and
WHEREAS, on April 1, 2024 the San Carlos PTC adopted PTC Resolution No. 2024-11 recommending City Council approval of a Zoning District Boundary Map Amendment and Prezoning and Annexation which includes the reasons for the recommendation, findings related to the criteria for zoning amendments in Section 18.35.080 and the relationship of the proposed amendment to applicable general and specific plans; and WHEREAS, on June 24, 2024 City Council conducted a public hearing to consider the application from the property owners of the aforementioned property regarding a Zoning District Boundary Map Amendment and Prezoning of RS-3: Single Family, Low Density in conformance with Chapters 18.27 Common Procedures, 18.35 Amendments to the Zoning Ordinance and Map and 18.38 Prezoning and Annexation Procedure of the San Carlos Municipal Code and to receive PTC Resolution No. 2024-11 recommending approval of such; and WHEREAS, the City finds that a Zoning District Boundary Map Amendment and Prezoning
8.l
August 12, 2024
Packet Pg. 392
of RS-3: Single Family, Low Density for the aforementioned property is consistent with the City of San Carlos General Plan and Municipal Code.
SECTION 2: The City Council makes the following findings:
A. Regarding Section 18.35.080 B. Zoning District Boundary Map Amendments of the San Carlos Municipal Code:
1. The change in district boundaries is consistent with the General Plan.
Basis for Finding: The site is proposed for a General Plan land use designation of Single Family, Low Density (3 DUs/Acre) which is consistent and reflective of applicable General Plan policies.
2. The change in district boundaries is consistent with the purpose of this title to promote the growth of the City in an orderly manner and to promote and protect the public health, safety, peace, comfort and general welfare;
Basis for Finding: Annexation of this parcel is occurring in an orderly and systematic matter as City jurisdiction and services are currently immediately adjacent to the subject site and would simply be extended to cover this one developed parcel. Annexation will result in clearer and more efficient emergency service to be provided to the site.
3. The change in district boundaries is necessary to achieve the balance of land uses desired by the City, consistent with the General Plan, and to increase the inventory of land within a given zoning district.
Basis for Finding: Annexation of the parcel results in the addition of one new single-family home into the City’s housing stock and a slight increase in the annual property tax revenue to be received. The use and nature of the existing single-family home is consistent and complimentary to the established surrounding land use pattern of other single-family homes in the adjacent City neighborhoods.
B. Regarding Section 18.38.040 Annexation Regulations:
1. The site is located contiguous both to the City boundary and a city maintained street. A fiscal impact analysis has been prepared by an economic development and consulting firm which concludes that the City will receive annual net revenue and that no additional recurring service costs are directly associated. Staff has determined the project to be exempt from the provisions of CEQA per Section 15319 Annexation of Existing Facilities and Lots for Exempt Facilities and Section 15303 New Construction or Conversion of Small Structures. Public services and facilities are determined to be available. The site is a developed parcel and complies with the associated requirements provided within Section 18.38.040(C).
SECTION 3: The approved Zoning District Boundary Map Amendment to prezone the property to RS-3: Single Family, Low Density is set forth in the map listed as Exhibit “A” and with conditions of approval as set forth in Exhibit “B”.
SECTION 4: That the City Council hereby declares that it would have passed this Ordinance sentence by sentence, paragraph by paragraph, and section by section, and does
8.l
August 12, 2024
Packet Pg. 393
hereby declare that any provisions of this Ordinance are severable and, if for any reason any sentence, paragraph or section of this Ordinance shall be held invalid, such decision shall not effect the validity of the remaining parts of this Ordinance.
SECTION 5: This Ordinance shall be published and posted according to law and shall take effect and be in force from and after 30 days after its passage and adoption. *****
I, City Clerk Crystal Mui hereby certify that the foregoing Ordinance was introduced on the 24th day of June 2024 and adopted at a regular meeting of the City Council of the City of San Carlos held on the 12th day of August 2024, by the following vote:
AYES, COUNCIL MEMBERS: ______________________________________________ NOES, COUNCIL MEMBERS: ______________________________________________ ABSENT, COUNCIL MEMBERS: ______________________________________________ ________________________________
CITY CLERK of the City of San Carlos
APPROVED:
______________________________________
MAYOR of the City of San Carlos
Exhibits:
A. Zoning District Boundary Map Amendment Map
B. Zoning District Boundary Map Amendment Conditions of Approval
8.l
August 12, 2024
Packet Pg. 394
Exhibit A – Zoning District Boundary Map Amendment Map
Zoning District Boundary Map Amendment: RS-3: Single
Family, Low Density
8.l
August 12, 2024
Packet Pg. 395
Exhibit B– Zoning District Boundary Map Amendment Conditions of Approval for annexation of 244 Club Drive (APN: 049-050-070)
1. The applicant shall apply to the Local Agency Formation Commission (LAFCo) for annexation to the City of San Carlos.
2. The prezoning shall remain the same for two years after annexation in compliance with Chapter 18.38 of the San Carlos Municipal Code.
3. The applicant shall comply with all future conditions of the Public Works Division, to the satisfaction of the Public Works Director, including but not limited to the following prior to annexation:
a. The Applicant shall be responsible for preparing and submitting an application to LAFCo requesting a detachment/annexation of the subject property into the City service boundary and obtain LAFCo approval and provide a recorded LAFCo Certificate of Compliance to the City Engineer prior to the City accepting, reviewing or approving any application for a sewer connection to the City sewer system. The Applicant shall be responsible for coordinating with the County, the lead agency, and LAFCo and pay all applicable and necessary fees as required by LAFCo and the County for processing, review and approval of the detachment/annexation proceedings.
b. The applicant shall pay all applicable and required public services charges and City fees including but not limited to sewer connection fees, Building Permit fees, Encroachment Permit fees, Plan Check and Inspections fees prior to issuance of a Building Permit, Sewer Construction Permit, Encroachment Permit or any connection to the City sewer system.
c. The Applicant shall prepare and submit engineering design level drawings to the City for review, approval and issuance of applicable permits prior to starting any construction or connection to the City sewer system. The permit drawings shall include traffic control plans.
d. All existing improvements displaced or damaged during construction shall be replaced in kind and to the satisfaction of the City Engineer. e. A Sewer Construction Permit must be obtained from the Public Works Department prior to starting any sewer construction work. f. A new sanitary sewer cleanout shall be constructed at the property line in accordance with the City Standard Specifications and Standard detail No. 17.
Trench replacement within the City public street right of way shall be in accordance with the City Standard Detail No. 18.
g. Any new force mains or pump station shall be installed on private property and shall be owned and maintained by the property owner(s).
4. The applicant shall comply with any and all future conditions of the Building Division, to the satisfaction of the Chief Building Official, prior to annexation.
8.l
August 12, 2024
Packet Pg. 396
5. The applicant shall be responsible to obtain any and all required approvals from the San Mateo County Environmental Health Department.
6. The applicant shall comply with any and all future conditions of the Fire Department, to the satisfaction of the Fire Marshal prior to annexation.
8.l
August 12, 2024
Packet Pg. 397
CITY COUNCIL
STAFF REPORT
MEETING DATE: August 12, 2024
ITEM TITLE: Consideration of Introducing an Ordinance Amending San Carlos Municipal Code Title 18 – Zoning, Section 18.04.020 (Land Use Regulations) to Allow Childcare Facilities within Certain Existing Buildings within the RS-3 (Single-family, Low Density), RS-6 (Single- family), and RM-20 (Multi-family 20 units/acre) Zoning Districts.
RECOMMENDATION:
The Planning and Transportation Commission (PTC) recommends that the City Council introduce an Ordinance to allow childcare facilities within certain existing buildings within the RS-3 (Single- family, Low Density), RS-6 (Single-family), and RM-20 (Multi-family 20 units/acre) zoning districts.
FISCAL IMPLICATIONS:
There are no fiscal impacts.
SUMMARY:
The proposed amendments would allow day care centers to be a permitted use in the RS-3 (Single-family, Low Density), RS-6 (Single-family), and RM-20 (Multi-family 20 units/acre) zoning districts if they are to be established in an existing building that was built for and/or previously operated as a legally established public or semi-public use.
BACKGROUND:
Through the strategic plan process, the San Carlos City Council identified the creation, operation and access to childcare as a top priority for the city.
On March 11, 2024, the City Council formally adopted its 2024 Strategic Plan and memorialized childcare as a top priority with the inclusion of the strategic goal that “The City of San Carlos will encourage and support the creation, operation, and access to childcare facilities and reduce barriers to creation and expansion.”
As part of this goal, the Strategic Plan incorporates an objective to consider zoning/co-location options for childcare sites which included the consideration of a zoning update to allow childcare centers in single-family residential districts on sites that were previously schools, religious facilities, or community centers.
Planning and Transportation Commission Recommendation
At the June 3, 2024 PTC meeting, staff presented the proposed Zoning Code amendments to the
9.a
August 12, 2024
Packet Pg. 398
PTC. The PTC adopted Resolution 2024-12 (3 in favor, 2 excused) recommending that the City Council adopt the proposed Zoning Code amendments.
ANALYSIS:
The Municipal Code currently does not permit day care centers in the RS-3 (Single-family, Low Density), RS-6 (Single-family), and RM-20 (Multi-family 20 units/acre) zoning districts. However, there are a number of buildings that were constructed for or previously occupied by public and semi-public uses in which a day care center would be an appropriate use of the space, should they ever become vacant. These previous public and semi-public uses include community assembly (i.e. meeting halls and religious facilities), cultural institutions, and private schools.
The RM-59 (Multi-family 59 units/acre) and RM-100 (Multi-family 100 units/acre) zoning districts already allow day care centers as a permitted use. Further, day care centers are a permitted use in all mixed-use zoning districts except for the MU-DC-100 (Mixed-Use Downtown Core).
The proposed amendments, if adopted, would allow day care centers to be a permitted use in the RS-3, RS-6, and RM-20 zoning districts if they are to be established in an existing building that was built for and/or previously operated as a legally established Public or Semi-public use. This allows for the reuse of existing buildings within these zoning districts while increasing the available locations for day care centers in San Carlos
Environmental Determination
This project has been determined to be exempt from the provisions of the California Environmental Quality Act (CEQA) Guidelines Section 15061(b)(3), the general exemption for projects with no potential for a significant effect in the environment. As a text amendment, it can be seen with certainty that there is no possibility that the amendments will have a significant effect on the environment.
ALTERNATIVES:
The alternatives available to the City Council include:
1. Introduce an Ordinance amending San Carlos Municipal Code Title 18 – Zoning: Section
18.04.020 (Land Use Regulations) to allow childcare facilities within certain existing buildings within the RS-3 (Single-family, Low Density), RS-6 (Single-family), and RM-20 (Multi-family 20 units/acre) zoning districts; or
2. Do not introduce the proposed Ordinance; or
3. Provide staff with alternative direction.
Respectfully submitted by:
Al Savay, Community Development Director
9.a
August 12, 2024
Packet Pg. 399
Approved for submission by:
_______________________
Jeff Maltbie, City Manager
ATTACHMENT(S):
1. Proposed Ordinance
Exhibit A to Ordinance – Childcare Amendments to Title 18
2. PTC June 3, 2024 Meeting Minutes
3. Public Hearing Notice Affidavit
9.a
August 12, 2024
Packet Pg. 400
2 6
5 6
ORDINANCE NO. ____
AN ORDINANCE OF THE CITY OF SAN CARLOS AMENDING SAN CARLOS MUNICIPAL CODE TITLE 18 - ZONING, SECTION 18.04.020 (LAND USE REGULATIONS)
TO ALLOW CHILDCARE FACILITIES WITHIN CERTAIN EXISTING BUILDINGS WITHIN THE RS-3 (SINGLE-FAMILY, LOW DENSITY), RS-6 (SINGLE-FAMILY), AND RM-20 (MULTI-FAMILY 20 UNITS/ACRE) ZONING DISTRICTS.
SECTION 1: The City Council of the City of San Carlos does hereby ordain as follows:
WHEREAS, through the strategic plan process, the City Council identified the creation, operation and access to childcare as a top priority for the City; and WHEREAS, on March 11, 2024, the City Council formally adopted its 2024 Strategic Plan and memorialized childcare as a top priority with the inclusion of the strategic goal that “The City of San Carlos will encourage and support the creation, operation, and access to childcare facilities and reduce barriers to creation and expansion”; and
WHEREAS, as part of this goal, the strategic plan incorporates an objective to consider zoning/co-location options for childcare sites which included the consideration of a zoning update to allow childcare centers in single-family residential districts on sites that were previously schools, religious facilities, or community centers; and WHEREAS, the City currently does not allow day care centers within the RS-3 (Single- family, Low Density), RS-6 (Single-family), and RM-20 (Multi-family 20 units/acre) zoning districts; and
WHEREAS, the proposed amendment would allow day care centers within the RS-3, RS- 6, and RM-20 by right if they are to be established in an existing building that was built for and/or previously operated as a legally established Public or Semi-public use; and WHEREAS, pursuant to Government Code Section 65853 and 65850 and San Carlos Municipal Code Chapter 18.35, when a change in the Zoning Ordinance (Title 18 of the San Carlos Municipal Code) is found necessary, the Planning and Transportation Commission shall hold a public hearing to consider such change and render its recommendation to the City Council; and WHEREAS, pursuant to San Carlos Municipal Code Chapter 18.35.050 and California Government Code Section 65090 and 650901, a Public Hearing Notice was Published on May 23, 2024, for the draft San Carlos Municipal Code Zoning Amendments in the newspaper, and distributed to interested parties; and
WHEREAS, the proposed amendments to the San Carlos Municipal Code as mentioned above are exempt from the provisions of the California Environmental Quality Act (CEQA) Guidelines Section 15061(b)(3), the general exemption for projects with no potential for a significant effect in the environment. As a text amendment, it can be seen with certainty that there is no possibility that the amendments will have a significant effect on the environment; and
9.a
August 12, 2024
Packet Pg. 401
WHEREAS, the Planning and Transportation Commission conducted a public hearing to hear and consider all comments of all persons interested in or concerned with the proposed amendments of the City of San Carlos Municipal Code on June 3, 2024 in consideration of a recommendation to the City Council regarding adoption of an Ordinance; and WHEREAS, at this meeting, the Planning and Transportation Commission recommended that the City Council introduce this ordinance (Resolution PTC2024-12), based on the required findings; and
WHEREAS, the City Council finds the desired outcome of the Ordinance update is to increase access to day care centers throughout the City by reducing the regulatory and financial barriers to the creation and expansion of childcare facilities in San Carlos.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of San Carlos as follows:
SECTION 2: The City Council makes the following findings:
A. The proposed ordinance amendments are consistent with the General Plan.
The recently updated 2023-2031 Housing Element includes the following goal:
oGoal HOU-7 which states: “Increase Access to Child Care” Policy HOU-7.1 States “Access to Childcare. Increase access to childcare by including childcare facility siting opportunities and reducing regulatory and financial barriers to the creation an expansion of childcare facilities in San Carlos.”
Basis for Finding: The proposed ordinance amendments would increase access to day care centers throughout the city by allowing them in additional zoning districts. This would also allow providers more options in where to locate their centers. Further, allowing day care centers by- right, when located in an existing building that was built for and/or previously operated as a legally established Public or Semi-public use, would reduce the regulatory and financial barriers to the creation and expansion of childcare facilities in San Carlos.
B. The ordinance amendment is consistent with the purpose of the zoning title to promote the growth of the City in an orderly manner and to promote and protect the public health, safety, peace, comfort and general welfare.
Basis for Finding: The proposed ordinance amendment would promote further growth of childcare facilities in the city and would reduce the regulatory and financial barriers to the creation and expansion of childcare facilities in San Carlos by making additional properties available for this use.
SECTION 3: The City Council hereby approves the Municipal Code Ordinance amendment attached as Exhibit A.
SECTION 4: Replacement of Code. San Carlos Municipal Code Section 18.04.020 (Land Use Regulations) is hereby replaced with the language in Exhibit A.
9.a
August 12, 2024
Packet Pg. 402
SECTION 5: California Environmental Quality Act Determination. The City Council hereby finds that this Ordinance is exempt from the provisions of the California Environmental Quality Act (CEQA) Guidelines Section 15061(b)(3), the general exemption for projects with no potential for a significant effect in the environment. As a text amendment, it can be seen with certainty that there is no possibility that the amendments will have a significant effect on the environment.
SECTION 6: Severability. That the City Council hereby declares that it would have passed this Ordinance sentence by sentence, paragraph by paragraph, and section by section, and does hereby declare that any provisions of this Ordinance are severable and, if for any reason any sentence, paragraph or section of this Ordinance shall be held invalid, such decision shall not affect the validity of the remaining parts of this Ordinance.
SECTION 7: Publication and Effective Date. This Ordinance shall be published and posted according to law and shall take effect and be in force from and after 30 days after its passage and adoption.
* * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Ordinance was introduced on the 12th day of August, 2024 and passed and adopted as an Ordinance of the City Council of the City of San Carlos at a regular meeting thereof held on the _____ day of _____, 2024 by the following vote:
________________________________
CITY CLERK of the City of San Carlos
APPROVED:
____________________________
MAYOR of the City of San Carlos
Exhibit A: Changes to San Carlos Municipal Code 18.04.020 - Land Use Regulations AYES, COUNCILMEMBERS:
NOES, COUNCILMEMBERS:
ABSENT, COUNCILMEMBERS:
9.a
August 12, 2024
Packet Pg. 403
EXHIBIT A
18.04.020 Land use regulations.
Table 18.04.020 prescribes the land use regulations for residential districts. The regulations for each district are established by letter designations as follows:
“P” designates permitted uses.
“M” designates use classifications that are permitted after review and approval of a minor use permit by the Zoning Administrator.
“C” designates use classifications that are permitted after review and approval of a conditional use permit by the Planning and Transportation Commission.
“(#)” numbers in parentheses refer to specific limitations listed at the end of the table. “-” designates uses that are not permitted.
Use classifications are defined in Chapter 18.40, Use Classifications. In cases where a specific land use or activity is not defined, the Director shall assign the land use or activity to a classification that is substantially similar in character. Use classifications and subclassifications not listed in the table or not found to be substantially similar to the uses below are prohibited. The table also notes additional use regulations that apply to various uses. Section numbers in the right-hand column refer to other sections of this title.
TABLE 18.04.020: LAND USE REGULATIONS—RESIDENTIAL DISTRICTS Use Classification
RS-
3 RS-6
RM-
20 RM-
59 RM-
100
Additional Regulations
Residential Uses
Residential Housing
Types
See subclassifications below
Single-Unit Dwelling P P - - - See Section 18.04.100, Small lot
9.a
August 12, 2024
Packet Pg. 404
TABLE 18.04.020: LAND USE REGULATIONS—RESIDENTIAL DISTRICTS Use Classification
RS-
3 RS-6
RM-
20 RM-
59 RM-
100
Additional Regulations
Small Lot Single-Unit
Subdivision
Development
C
(1)
C
(1)
P C
(2)
C
(2)
Accessory Dwelling
Unit
P P P P P
Junior Accessory
Dwelling Unit
P P - - -
Duplex P P P - -
Urban Infill Units P P - - -
Townhouse
Development
- C P* P* P*
subdivision standards
See Section 18.04.070, Residential
development types
See Section 18.04.080, Duplex standards
See Section 18.04.090, Townhouse
standards
*For townhouse development in RM
districts, Development Standards of RM
District shall apply
Multi-Unit Residential - - P P P
Elderly and Long-
Term Care
- - - C C
Family Day Care See subclassifications below
Small P P P P P
Large P P P P P
Group Residential - - - P P
Residential Care
Facilities
See subclassifications below
General - - M M M See Section 18.23.200, Residential care facilities
Limited P P P P P
Senior - - M M M See Section 18.23.200, Residential care facilities
9.a
August 12, 2024
Packet Pg. 405
TABLE 18.04.020: LAND USE REGULATIONS—RESIDENTIAL DISTRICTS Use Classification
RS-
3 RS-6
RM-
20 RM-
59 RM-
100
Additional Regulations
Single Room
Occupancy
- - C C C See Section 18.23.220, Single room
occupancy hotels
Transitional Housing P P P P P See Section 18.23.250, Transitional and supportive housing
Supportive Housing P P P P P See Section 18.23.250, Transitional and supportive housing
Public and Semi-Public Uses
Community Assembly - C - C C See Section 18.23.080, Community assembly facilities
Community Garden P P P P P
Cultural Institution - C - C C
Day Care Centers P* P* P* P P See Section 18.23.090, Day care * Permitted only when in an existing
building built for and/or previously
operated as a legally established Public
or Semi-public use.
Park and Recreation
Facilities, Public
P P P P P
Public Safety Facilities - C C C C
Schools, Public or
Private
- C C C C
Social Service
Facilities
- - - M M
Commercial Uses
9.a
August 12, 2024
Packet Pg. 406
TABLE 18.04.020: LAND USE REGULATIONS—RESIDENTIAL DISTRICTS Use Classification
RS-
3 RS-6
RM-
20 RM-
59 RM-
100
Additional Regulations
Eating and Drinking
Establishments,
Convenience
- C(3) - - - See Section 18.23.140, Outdoor dining
Retail Sales,
Convenience Markets
- C(3) - - -
Transportation, Communication, and Utilities Uses
Communication
Facilities
See Chapter 18.24, Wireless Telecommunications Facilities Utilities, Minor P P P P P
Other Applicable Types
Accessory Uses and
Structures
See Sections 18.15.020, Accessory buildings and structures, and 18.23.030, Accessory uses
Home Occupations P P P P P See Section 18.23.120, Home
occupations
Nonconforming Use Chapter 18.19, Nonconforming Uses, Structures, and Lots Temporary Use See Section 18.23.240, Temporary uses
Specific Limitations:
1. In addition to standard use permit findings, the Planning and Transportation Commission must find that the development is designed with massing and height that is sensitive to the building pattern of the area and adjacent properties.
2. In addition to standard use permit findings, the Planning and Transportation Commission must find that specific site conditions exist such that the proposed development type is equal to or better than multi-unit residential or townhouse development types with regard to design and achievable density and the project is designed with massing and height that is sensitive to the building pattern of the area and adjacent properties.
3. Subject to the following limitations:
9.a
August 12, 2024
Packet Pg. 407
a. Limited to cafes, coffee shops, delis, and neighborhood markets. Full service restaurants are not allowed. b. Limited to one thousand five hundred (1,500) square feet of sales area. c. Hours of operation are limited to between seven (7) a.m. and nine (9) p.m. d. Must be located within a two (2) story building.
e. Must be located on a corner lot with frontage on an arterial a minimum of one-half (1/2) mile from the MU-DC-100, MU-D-100 and MU-D-120 districts and other existing neighborhood-serving retail. f. In addition to the findings required for all use permits, the Planning and Transportation Commission must find that the proposed use promotes community health, interaction, and socialization of the neighborhood; complements the residential character of the surrounding neighborhood; and will not adversely impact adjacent properties.
9.a
August 12, 2024
Packet Pg. 408
June 3, 2024 1
San Carlos City Planning and Transportation Commission
Regular Meeting
Council Chambers, City Hall
600 Elm Street, San Carlos, CA 94070
June 3, 2024 7:00 PM
APPROVED MINUTES
1. CALL TO ORDER – Call to order at 7:00 pm
2. ASSEMBLY BILL 2449 TELECONFERENCE REQUESTS - None
3. PLEDGE OF ALLEGIANCE
4. ROLL CALL
Commissioners Present:
Jim Iacoponi, Chair
Janet Castaneda
Ellen Garvey
Commissioners Absent
Kristen Clements, Vice Chair
David Roof
Staff Present:
Andrea Mardesich, Assistant Community Development Director Rucha Dande, Principal Planner
Brandon DeLucas, Senior Planner, Consultant
5. APPROVAL OF MINUTES
a
Approval of the May 20, 2024 Planning and Transportation Commission (PTC) Meeting Minutes.
MOTION: Approve the Minutes from the Planning and Transportation Commission Meeting of May 20, 2024.
MOVER: Janet Castaneda
SECONDER: Ellen Garvey
AYES: Garvey, Castaneda, Iacoponi
NAYS:
ABSENT:
None
Kristen Clements, David Roof
RESULT: Motion Passed 3 – 0 – 2
6. PUBLIC HEARING
a. Consideration of proposed amendments to San Carlos Municipal Code Section 18.04.020 (Land Use Regulations) to allow childcare facilities in certain existing buildings within the RS-3 (Single-family, Low Density), RS-6 (Single-family), and RM-20 (Multi-family, 20 units/acre) Zoning Districts.
Brandon DeLucas, Senior Planner Consultant presented the item.
9.a
August 12, 2024
Packet Pg. 409
June 3, 2024 2
Commissioners asked clarifying questions.
City staff addressed the Commission's inquiries.
Public Comment - None
The Commission was supportive of the recommendation.
MOTION: Close Public Comment
MOVER: Ellen Garvey
SECONDER: Janet Castaneda
AYES: Garvey, Castaneda, Iacoponi
NAYS:
ABSENT:
None
Kristen Clements, David Roof
RESULT: Motion Passed 3 – 0 – 2
MOTION: Adopt Resolution PTC2024-12 recommending the City Council introduce an Ordinance approving amendments to the San Carlos Municipal Code Section
18.04.020 (Land Use Regulations) to allow childcare facilities in certain existing buildings within the RS -3 (Single -Family, Low Density), RS -6 (Single -Family), and RM-20 (Multi-Family 20 Units/Acre) zoning districts.
MOVER: Ellen Garvey
SECONDER: Janet Castaneda
AYES: Garvey, Castaneda, Iacoponi
NAYS:
ABSENT:
None
Kristen Clements, David Roof
RESULT: Motion Passed 3 – 0 – 2
7. REPORTS, CORRESPONDENCE AND GENERAL INFORMATION
a. Report on Recent City Council Actions - None
b. Planning and Transportation Commission comments or reports
Commissioner Garvey noted that this evening’s meeting was Chair Iacoponi’s last on the Planning and Transportation Commission. Both Commissioner Garvey and Commissioner Castaneda thanked Chair Iacoponi for his leadership and expressed that he would be dear ly missed.
Chair Iacoponi thanked City Staff and his fellow commissioners for making his tenure wonderful and productive.
c. Correspondence - None
d. Planning Staff comments, reports, and updates on current projects
Andrea Mardesich, Assistant Community Development Director gave the following updates.
• Thanked Chair Iacoponi for his guidance and leadership over the past six years. • The agenda for the June 17, 2024 PTC Meeting includes Mult -Family ODS study session, General Plan Capacity Revision Environmental Impact Report scoping
9.a
August 12, 2024
Packet Pg. 410
June 3, 2024 3
meeting, a design review amendment for 642 Quarry and lastly, a new business item to vote whether July would be a recess.
e. Single-Family Objective Design Standards 6-Month Evaluation Report
The Commission was impressed with the reduction in review time.
8. PUBLIC COMMENTS - None
ADJOURNMENT – The meeting was adjourned at 7:25pm
MOTION: Close Public Comment
MOVER: Ellen Garvey
SECONDER: Janet Castaneda
AYES: Garvey, Castaneda, Iacoponi
NAYS:
ABSENT:
None
Kristen Clements, David Roof
RESULT: Motion Passed 3 – 0 – 2
Andrea Mardesich, Assistant
Community Development Director
9.a
August 12, 2024
Packet Pg. 411
9.a
August 12, 2024
Packet Pg. 412
9.a
August 12, 2024
Packet Pg. 413
CITY COUNCIL
STAFF REPORT
MEETING DATE: August 12, 2024
ITEM TITLE: Consideration of Adopting a Resolution Establishing a Childcare Grant Program Utilizing Funds Collected through the Childcare Development Impact Fees to Increase Childcare Spaces within the City of San Carlos.
RECOMMENDATION:
Staff recommends that the City Council adopt a Resolution establishing a Childcare Grant Program utilizing funds collected through the Childcare Development Impact Fees to increase childcare spaces within the City of San Carlos.
FISCAL IMPLICATIONS:
Fund 26, the Childcare Development Impact Fee Fund, is the source of grant funding to local childcare centers (commercial and in-home). To date, the City has collected Childcare Development Impact fees in the amount of $1,033,530. The approved budget for grant expenditures from this fund for Fiscal Year (FY) 2024-25 is $250,000. This proposed Childcare Grant Program will function on a first-come first-served basis and applications will be accepted on a rolling basis until funding runs low. The City Council may choose to appropriate additional funds if grants exceed $250,000 in the fiscal year. Funding for future fiscal years would come from the remaining fund balance and any Childcare Development Impact Fees collected from future applicable developments.
BACKGROUND:
One of the City Council’s ongoing strategic goals is to increase access to childcare by reducing regulatory and financial barriers to the creation and expansion of childcare facilities in the city. In October 2017, the Council received an informational presentation from staff describing potential strategies to address the shortage of childcare facilities serving the San Carlos community. This presentation was a response to information provided by San Mateo County’s Early Learning Support Services which highlighted the need for additional childcare. At that time, there was a shortage of more than 650 spaces for infant and preschool-aged children in San Carlos.
At the end of 2022, the City Council adopted the Childcare Development Impact Fee (Ordinance 1585 and Resolution 2022-104), which was authorized under the Mitigation Fee Act and applies to new nonresidential development. A Nexus Study was also prepared to determine the appropriate fee levels and plans for how to use the funds. One of the proposed uses of funds was the development of a Childcare Grant Program, available to both commercial and in-home childcare centers located within the City.
10.a
August 12, 2024
Packet Pg. 414
ANALYSIS:
Grant Program Overview
The proposed Childcare Grant Program would be designed in accordance with the City’s Childcare Development Impact Fee Ordinance (Ord. 1585) and support the 2024 San Carlos Strategic Goals and Objectives. It would help encourage and support the creation and expansion of quality childcare spaces available to residents and employees in San Carlos.
Qualification Criteria
To be considered for a grant, a business must meet the following criteria:
Must be a commercial or in-home childcare center located within the City of San Carlos Childcare center serves children aged 4 and under
Must be licensed by the State of California
Must use funds for capital improvement costs (not maintenance or operations) Must provide an invoice for reimbursement
Must agree to the terms in the “Agreement for Receipt of Grant Funds” Must have a registered business license with the City of San Carlos Must submit annual reporting and/or tracking to demonstrate how grant funds were used to increase childcare spaces
Permissible Uses
Only commercial and in-home childcare centers located in San Carlos may apply for the grant.
The proposed grant funds can only be used to fund capital improvement costs (not maintenance or operations). It is important to note that these funds cannot be used to subsidize operations or direct assistance with childcare costs. The capital improvements must lead to expansion of childcare spaces. The grant may also be used for capital improvements to modify the childcare center to meet changing space needs, such as modifying from toddler to infant spaces.
Types of eligible projects may include but are not limited to:
Land acquisition
Center acquisition
New construction of center
Tenant improvements to prepare existing structure for childcare uses Expansion of currently operating center
Improvement to establish new small or large in-home childcare Center within corporate campus
Center within new or existing commercial development
Childcare within new housing developments
Other pursuits associated with increasing childcare spaces
10.a
August 12, 2024
Packet Pg. 415
Eligible expenses do not include general operating costs, but may include:
Development or construction related costs
Capital equipment including but not limited to furniture, play equipment, learning materials, safety equipment, kitchen equipment, technology, outdoor play equipment, and restroom fixtures.
Fixed furnishings including but not limited to built-in storage units, sinks, faucets, changing stations, partition walls, flooring, lighting fixtures, HVAC systems, and safety features.
Review Process and Funding Distribution
Applications will be reviewed by City of San Carlos staff to determine if they are complete and responsive to the request. City Staff will evaluate qualified applications against the permissible uses and priorities identified above or any other relevant criteria developed and consistently applied. Grants will be offered to applicants proposing projects and/or programs that best meet the goals and requirements of the NOFA (See Attachment 1, Exhibit A).
The selected applicants will be required to enter into an Agreement for Receipt of Grant Funds with the City. Once the capital improvement project is completed, the recipient may request the preapproved grant funds from the City by submitting an invoice and documentation of work completed.
Funding Priorities, Availability, and Other Requirements
All applicants must be located within the City of San Carlos. Applications will be accepted and reviewed on a first-come first-served basis. There is $250,000 per fiscal year currently budgeted under this Notice of Funding Availability (NOFA). Each applicant may apply for a maximum of $100,000 in grant funding. Funds are expected to be distributed amongst a few eligible candidates that best demonstrate the ability to meet the City’s childcare needs. A childcare provider may reapply for the grant after being a recipient in the previous fiscal year, contingent upon availability and qualifications. Applicants may apply for grant funding retroactively for any capital improvements made after November 27, 2022 (effective date of the Impact Fee) contingent on required documentation. The City retains sole discretion to evaluate and make grants available and is under no obligation until an agreement or contract is executed. Please see attachment 1 Exhibit A for the full Notice of Funding Availability (NOFA) and sample application.
Next Steps
If Council approves the Childcare Grant Program, the NOFA would be distributed starting August 19, 2024 and the City would immediately start accepting applications thereafter. The NOFA will be promoted through a robust outreach plan to ensure all childcare providers are aware of the grant opportunity. This includes:
City childcare webpage
City social media (Facebook, Nextdoor, X, and Instagram)
10.a
August 12, 2024
Packet Pg. 416
Flyers at the San Carlos Art and Wine Festival
Emails directly to childcare providers
Emails to County childcare liaisons
ALTERNATIVES:
The alternatives available to the City Council include:
1. Adopt a Resolution Establishing a Childcare Grant Program Utilizing Funds Collected through the Childcare Development Impact Fees to Increase Childcare Spaces within the City of San Carlos; or
2. Do not adopt the Resolution; or
3. Provide staff with alternative direction.
Respectfully submitted by:
Al Savay, Community Development Director
Approved for submission by:
_______________________
Jeff Maltbie, City Manager
ATTACHMENT(S):
1. Resolution with Exhibit A: Childcare Grant Program NOFA and Application
2. Sample Agreement for Receipt of Grant Funds
3. Links to Ordinance 1585, Resolution 2022-104, Childcare Impact Fee Nexus Study, and City of San Carlos 2024 Strategic Plan
10.a
August 12, 2024
Packet Pg. 417
RESOLUTION NO. 2024 – ____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CARLOS
ESTABLISHING A CHILDCARE GRANT PROGRAM UTILIZING FUNDS COLLECTED
THROUGH THE CHILDCARE DEVELOPMENT IMPACT FEES TO INCREASE CHILDCARE SPACES WITHIN THE CITY OF SAN CARLOS.
RECITALS
WHEREAS, the San Mateo County Child Care Needs Assessment prepared by the San Mateo County Child Care Partnership Council in 2017 states that there is a shortage of more than 650 spaces for infant and preschool-aged children in San Carlos; and WHEREAS, in August 2022, City Council adopted Ordinance 1585 and Resolution 2022- 104 under the authority of Sections 66000 et seq. of the California Government Code (“Mitigation Fee Act”), establishing a Childcare Development Impact Fee for new nonresidential development in the City of San Calos as part of the 2022 City Council Strategic Goals to help encourage and support the creation and expansion of quality childcare spaces available to residents and employees in San Carlos; and
WHEREAS, the City Council reprioritized childcare in the 2024 Strategic Goals and Objectives, with a key objective of developing a plan on how to utilize the childcare funds collected through the Childcare Impact Fees; and
WHEREAS, the implementation measures associated with the Childcare Development Impact Fees include the establishment of a Childcare Grant Program available to any childcare provider (commercial and in-home serving children aged 4 and under) located within the City of San Carlos; and
WHEREAS, in January 2024, staff met one-on-one with six childcare providers and learned that the providers are interested in and would utilize the grant program; and WHEREAS, on May 4, 2024, staff in partnership with the Childcare Subcommittee, organized a Childcare Open House, where the community had an opportunity to meet their local childcare providers in-person, that brought together over 100 families and where the childcare providers reaffirmed their interest in a grant program; and WHEREAS, the Childcare Grant Program would provide funds for capital improvements that lead to the expansion of childcare spaces in accordance with the Childcare Development Impact Fee requirements; and
WHEREAS, grant applications will be accepted and reviewed on a first-come first-served basis and continue to be accepted on a rolling basis until funds run low; and WHEREAS, the total available funding for the grant program for Fiscal Year (FY) 2024- 25 is $250,000 and the maximum grant award limit per applicant is $100,000; and WHEREAS, City Council may choose to appropriate additional funds if grants exceed $250,000 in the fiscal year contingent on funding availability and demand; and
10.a
August 12, 2024
Packet Pg. 418
WHEREAS, the Childcare Grant Program Notice of Funding Availability (NOFA) in Exhibit A includes all the details and specific requirements for the grant, which may be updated as needed; and
WHEREAS, if the Childcare Grant Program was approved, the NOFA would be released on August 19, 2024 and applications be accepted immediately thereafter.
NOW, THEREFORE BE IT RESOLVED, that the San Carlos City Council hereby establishes a Childcare Grant Program utilizing funds collected through the Childcare Development Impact Fees to increase childcare spaces within the City of San Carlos. * * * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Carlos at a scheduled meeting thereof held on the 12th day of August 2024, by the following vote:
________________________________
CITY CLERK of the City of San Carlos
APPROVED:
___________________________
MAYOR of the City of San Carlos
Exhibit A - Notice of Funding Availability (NOFA)
AYES, COUNCILMEMBERS:
NOES, COUNCILMEMBERS:
ABSENT, COUNCILMEMBERS:
10.a
August 12, 2024
Packet Pg. 419
Exhibit A
City of San Carlos
Notice of Funding Availability (NOFA)
Childcare Grant Program
Issued: August 19, 2024
Responses Due: Accepted on a Rolling Basis
10.a
August 12, 2024
Packet Pg. 420
Program Overview. The City of San Carlos invites local childcare centers (both in-home and commercial) providing childcare services to submit a request for funding as part of the Childcare Grant Program. The Childcare Development Impact Fee Fund (“Impact Fee Funds”) contains monies that shall be used to support the creation of childcare spaces within the City. The Fund monies shall be used in accordance with the City’s Childcare Development Impact Fee Ordinance (Ord. 1585) and 2024 San Carlos Strategic Plan Goals and Objectives to encourage and support the creation and expansion of quality childcare spaces available to residents and employees in San Carlos.
Permissible Uses. Per State Law, the grant funds can only be used to fund capital improvement costs (not maintenance or operations). It is important to note that these funds cannot be used to subsidize operations or direct assistance with childcare costs. Types of eligible projects may include but are not limited to:
•Land acquisition
•Center acquisition
•New construction of center
•Tenant improvements to prepare existing structure for childcare uses •Tenant improvements to modify existing childcare center to accommodate a different age group (i.e. toddlers to infants or infants to toddlers or between any age groups that the childcare provider deems fit)
•Expansion of currently operating center
•Improvement to establish new small or large in-home childcare •Center within corporate campus
•Center within new or existing commercial development
•Childcare within new housing developments
•Other pursuits associated with increasing childcare spaces Eligible expenses do not include general operating costs, but may include:
•Development or construction related costs
•Capital equipment including but not limited to furniture, play equipment, learning materials, safety equipment, kitchen equipment, technology, outdoor play equipment, and restroom fixtures.
•Fixed furnishings including but not limited to built-in storage units, sinks, faucets, changing stations, partition walls, flooring, lighting fixtures, HVAC systems, and safety features.
Funding Priorities. All applicants must be located within the City of San Carlos. Applications will be accepted and reviewed on a first come first serve basis. Applications will be accepted until grant funds are expended. Each applicant must submit a grant request that best supports the adopted purpose, goals, policies and provisions of the City’s Childcare Development Impact Fee Ordinance (Ord. 1585) and 2024 San Carlos Strategic Plan Goals and Objectives to encourage and support the creation and expansion of quality childcare spaces available to residents and employees in San Carlos.
10.a
August 12, 2024
Packet Pg. 421
Qualification Criteria. In order to be considered for a grant, a business must meet the following criteria:
•Must be a commercial or in-home childcare center located within the City of San Carlos •Childcare center serves children aged 4 and under
•Must be licensed by the State of California
•Must use funds for capital improvement costs (not maintenance or operations) •Must provide an invoice for reimbursement
•Must agree to the terms in the “Agreement for Receipt of Grant Funds” •Must have a registered business license with the City of San Carlos •Must submit annual reporting and/or tracking to demonstrate how grant funds were used to increase childcare spaces
Funding Availability. The approved budget for grant expenditures from this fund for Fiscal Year (FY) 2024-25 is $250,000. Each applicant may apply for a maximum of $100,000 in grant funding.
Funding is available on a first-come first-served basis until fund monies run out. Funds are expected to be distributed amongst a few eligible candidates that best demonstrate the ability to meet the City’s childcare needs. A childcare provider may reapply for the grant after being a recipient in the previous fiscal year, contingent upon availability and qualifications. Applicants may apply for grant funding retroactively for any capital improvements made after November 27, 2022 (effective date of the Impact Fee) contingent on required documentation. The City retains sole discretion to evaluate and make grants available and is under no obligation until an agreement or contract is executed.
Application Requirements. Applicants must submit a complete Funding Request Application in the form attached. The following information must be included in the application:
•Requested funding amount;
•Detailed description of the capital improvement;
•How the capital project will support the creation and expansion of childcare spaces in the City and how many childcare spaces the funding will create; •How the capital improvement project will help meet the adopted purpose, goals, policies and provisions of the City’s Childcare Development Impact Fee Ordinance (Ord. 1585) and 2024 San Carlos Strategic Plan Goals and Objectives to encourage and support the creation and expansion of quality childcare spaces available to residents and employees in San Carlos;
•An assurance of the ability to provide an annual report and project or program tracking detailing how the funds were used, results or progress on the program or project for which they were applied, if asked.
Application Review Process. Applications will be reviewed by City of San Carlos staff to determine if they are complete and responsive to the request. City Staff will evaluate qualified applications against the permissible uses and priorities identified above or any other relevant
10.a
August 12, 2024
Packet Pg. 422
criteria developed and consistently applied. Grants will be offered to applicants proposing projects and/or programs that best meet the goals and requirements of this NOFA.
Funding Distribution. The selected applicants will be required to enter into an Agreement for Receipt of Grant Funds with the City. Once the capital improvement project is completed, the recipient may request the preapproved grant funds from the City by submitting an invoice and documentation of work completed.
Application Deadline. Written requests for funding shall be mailed or hand delivered to the attention of Sajuti Haque, Sr. Management Analyst, at City Hall, 600 Elm Street, San Carlos, CA 94070 or emailed to [email protected]. Responses to this NOFA shall be received on a first-come first-served basis and on a rolling basis until funding is expended.
10.a
August 12, 2024
Packet Pg. 423
Application
Childcare Grant Program
Program/Project Title:
Project Address (if applicable):
Funding Amount Requested:
Childcare Center Name:
Website:
Childcare Center Address:
Contact Person & Title:
Phone Number:
Email Address:
*Please use additional pages to respond to the following requests:
1. Provide a detailed description of the capital improvement activities to be funded. Include how the capital improvement project will help meet the adopted purpose, goals, policies and provisions of the City’s Childcare Development Impact Fee Ordinance (Ord. 1585) and 2024 San Carlos Strategic Plan Goals and Objectives to encourage and support the creation and expansion of quality childcare spaces available to residents and employees in San Carlos.
2. Identify the number of new childcare spaces that the capital improvement will create.
3. Describe annual reporting and tracking methods to ensure City funds are helping to increase and expand childcare spaces.
10.a
August 12, 2024
Packet Pg. 424
Agreement for Receipt of Grant Funds 1 Revised 01/02/2020
AGREEMENT FOR RECEIPT OF GRANT FUNDS
This Agreement is made and entered into as of __________________by and between the City of San Carlos hereinafter called "CITY" and (childcare provider), A California Limited Partnership hereinafter called "GRANT RECIPIENT".
RECITALS
This Agreement is entered into with reference to the following facts and circumstances:
A. GRANT RECIPIENT is a provider of childc are services within the City of San Carlos.
B. GRANT RECIPIENT has submitted a request for grant funds from the CITY for its capital improvements to its childcare center.
C. The CITY finds that the GRANT RECIPIENT is a qualified childcare provider and that the grant of funds set forth herein is for an appropriate public purpose: help increase childcare spaces within the City of San Carlos.
D. That CITY has agreed to provide grant funds and desires to enter into this Agreement to govern the receipt and use of grant funds provided by CITY to GRANT RECIPIENT.
THEREFORE, the CITY has elected to engage the services of GRANT RECIPIENT upon the terms and conditions as hereinafter set forth.
1. Scope of Work. The scope of work to be performed by GRANT RECIPIENT under this Agreement shall include that “Scope of Work” set forth in Exhibit A, which is, by this reference, incorporated herein and made a part hereof as though it were fully set forth herein.
Performance of the work specified in said Exhibit is hereby made an obligation of GRANT RECIPIENT under this Agreement, subject to any changes that may be made subsequently hereto upon the mutual written agreement of the said parties.
Where in conflict, the terms of this Agreement supersede and prevail over any terms set forth in Exhibit A.
2. Term; Termination. (a) The term of this Agreement shall commence upon the date hereinabove written and shall expire upon__________________.
3. Grant Funds. CITY shall provide GRANT RECIPIENT with grant funds for the Scope of Work performed by GRANT RECIPIENT.
10.a
August 12, 2024
Packet Pg. 425
Agreement for Receipt of Grant Funds 2 Revised 01/02/2020 Notwithstanding the foregoing, the combined total of grant funds payable hereunder shall not exceed the sum of __________($____) unless the performance of services and/or reimbursement of costs and expenses in excess of said amounts have been approved in advance of performing such services or incurring such costs and expenses by CITY ’s City Manager (for contracts less than $75,000 or authorized by City Council action for contracts $75,000 or more by motion duly made and carried).
Grant funds hereunder shall be payable upon billing by GRANT RECIPIENT to CITY, which billing shall include an itemized statement, briefly describing by task and labor category or cost/expense items billed.
4. Additional Services. In the event CITY desires the performance of additional services not otherwise included within the services described in Exhibit A, such services shall be authorized in advance of the performance thereof by CITY ’s City Manager (for contracts less than $75,000 or authorized by City Council action for contracts $75,000 or more by motion duly made and carried). Such amendment to this Agreement shall include a description of the services to be performed thereunder, the maximum compensation and reimbursement of costs and expenses payable therefor, the time of performance thereof, and such other matters as the parties deem appropriate for the accomplishment of such services. Any additional services causing the total contract price to exceed $75,000, shall require approval by the City Council. Except to the extent modified by written amendment, all other terms and conditions of this Agreement shall be deemed incorporated in each such amendment.
5. Records. GRANT RECIPIENT shall keep and maintain accurate records of all time expended and costs and expenses incurred relating to services to be performed by GRANT RECIPIENT hereunder. Said records shall be available to CITY for review and copying during regular business hours at GRANT RECIPIENT’s place of business or as otherwise agreed upon by the parties.
6. Authorization. This Agreement becomes effective when endorsed by both parties in the space provided below.
7. Reliance on Professional Skill of GRANT RECIPIENT. GRANT RECIPIENT represents that it has the necessary professional skills to perform the Scope of Work and the CITY shall rely on such skills of the GRANT RECIPIENT to do and perform the work.
8. Relationship of Parties. It is understood that the relationship of GRANT RECIPIENT to the CITY is that of an independent contractor and all persons working for or under the dire ction of GRANT RECIPIENT are its agents or employees and not agents or employees of the CITY.
10.a
August 12, 2024
Packet Pg. 426
Agreement for Receipt of Grant Funds 3 Revised 01/02/2020
9. Indemnity. GRANT RECIPIENT here by agrees to defend, indemnify, and save harmless CITY, its Council, boards, commissions, officers, attorneys, employees and agents, from and agains t any and all claims, suits, actions liability, loss, damage, expense, cost (including, without limitation, costs of litigation and attorneys fees) of eve ry nature, kind or description, which may be brought against, or suffered or sustained by, CITY, its Council, boards, commissions, officers, attorne ys, employees or agents arising or resulting directly or indirectly fr om any act or omission of GRANT RECIPIENT, its officers, employees or agents in the performance of any services or work pursuant to this Agreement.
The duty of GRANT RECIPIENT to indemnify and save harmless, as set forth herein, shall include the duty to defend as set forth in Section 2778 of the California Civil Code; provided, however, that nothing herein contained shall be construed to require GRANT RECIPIENT to indemnify CITY, its Council, boards, commissions, officers, employees and agents against any responsibility or liability in c ontravention of Section 2782 of the California Civil Code.
10. Insurance. GRANT RECIPIENT shall acquire and maintain Workers’ Compensation, employer’s liability , commercial general liability, owned and non-owned and hired automobile li ability, and professional liability insurance covering risks relating to GRANT RECIPIENT ’s services to be performed hereunder in form subject to the approval of the City Attorney and/or CITY ’s Risk Manager. The minimum amounts of coverage corresponding to the aforesaid categories of insurance per insurable event, shall be as follows:
Insurance Category Minimum Limits
Workers’ Compensation statutory minimum
Employer’s Liability $1,000,000 per accident for bodily injury or disease. CONSULTANT shall submit
to City a Waiver of Subrogation
endorsement in favor of City, its officers,
agents, employees, and volunteers.
Commercial General Liability $1,000,000 per occurrence for bodily injury, personal injury, and property
damage, including without limitation,
blanket contractual liability and
coverage for explosion, collapse and
underground property damage hazards.
If a general aggregate limit applies,
10.a
August 12, 2024
Packet Pg. 427
Agreement for Receipt of Grant Funds 4 Revised 01/02/2020 either the general aggregate limit shall
apply separately to this project/location
or the general aggregate limit shall be
twice the required occurrence limit.
Coverage must be at least as broad as
Insurance Services Office form CG 00
01. Automobile Liability $1,000,000 per accident for bodily injury and property damage (coverage
required to the extent applicable to
GRANT RECIPIENT ’s vehicle usage in
performing services hereunder)
1Professional Liability $1,000,000 per claim and if a general aggregate limit applies, general
aggregate limit shall be twice the
required occurrence limit.
Concurrently with the execution of this Agreement, GRANT RECIPIENT shall furnish CITY with certificates and copies of information or declaration pages of the insurance required hereunder and, with respect to evidence of commercial general liability and automobile liability insurance coverage, original endorsements:
(a) Precluding cancellation or reduction in per occurrence limits before the expiration of thirty (30) days (10 days for nonpayment) after City shall have received written notification of cancellation in coverage or reduction in per occurrence limits by first class mail;
(b) GRANT RECIPIENT’s general liability policies shall be primary and non-contributory, and be endorsed using Insurance Services Office form CG 20 10 to provide that City and its officers, officials, employees, and agents shall be additional insured under such policies. An endorsement providing completed operations coverage for the additional insured, ISO form CG 20 37, is also required.
Claims Made Policies
If any of the required policies provide claims-made coverage:
1 Note: Professional liability insurance coverage is no t required if the contractor/vendor/consultant is not providing a service regulated by the state. (Examp les of service providers regulated by the state are insurance agents, professional engineers, doctors, ce rtified public accountants, lawyers, etc.) Please check and initial the following if professional liability is NOT required for this agreement.
Recommended ______ [Project Manager] Approved _______[Risk Manager]
10.a
August 12, 2024
Packet Pg. 428
Agreement for Receipt of Grant Funds 5 Revised 01/02/2020
1. The Retroactive Date must be shown, and must be before the date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroa ctive Date prior to the contract effective date, the GRANT RECIPIENT must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
Verification of Coverage
GRANT RECIPIENT shall furnish the CITY with original certificates and amendatory endorsements effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the CITY before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Waiver of Subrogation
GRANT RECIPIENT hereby grants to CITY a waiver of any right to subrogation which any insurer of said GRANT RECIPIENT may acquire against the CITY by virtue of the payment of any loss under such insurance. This provision applies regar dless of whether or not the CITY has requested or received a waiver of subrogation endorsement from the insurer.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Special Risks or Circumstances
CITY reserves the right to modify th ese requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Coverage
It is a requirement under this agre ement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be made available to the Additional Insured and shall be (1 ) the minimum coverage and limits specified in this Agreement; or (2 ) the broader coverage and maximum limits of coverage of any insurance policy, whichever is greater.
10.a
August 12, 2024
Packet Pg. 429
Agreement for Receipt of Grant Funds 6 Revised 01/02/2020 Primary and Non-Contributory Coverage
The Additional Insured coverage under the GRANT RECIPIENT ’s policy shall be “primary and non -contributory” as will not seek contribution from the CITY insurance or self-insurance and shall be at least as broad as CG 20 01 04 12.
Excess Insurance
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of CITY before the CITY insurance or self-insurance shall be called upon to protect it as a named insured.
11. WORKERS' COMPENSATION. GRANT RECIPIENT certifies that he is aware of the provisions of the Labor Code of the State of California which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and GRANT RECIPIENT certifies that he will comply with such provisions before commencing the performance of the work of this agreement.
12. NON-DISCRIMINATION. The GRAN T RECIPIENT will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The GRANT RECIPIENT will take affirmative action to insure that applicants are employed and the employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include, but not be limited to the following: employment, advancement, demotion, transfer, recruitment, or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, an d selection for training, including apprenticeship. The GRANT RECIPIENT shall at all times be in compliance with the requirements of the Federal Americans With Disabilities Act (Public Law 101-336) which prohibits discrimination on the basis of disability by public entiti es. The GRANT RECIPIENT agrees to post in conspicuous places available to employees and applicants for employment any notices provided by the CITY setting forth the provisions of this non-discrimination clause.
13. Notice. All notices required by this Agreement shall be given to the CITY and GRANT RECIPIENT in writing, by first class mail, postage prepaid, addressed as follows:
CITY: City of San Carlos
600 Elm Street
10.a
August 12, 2024
Packet Pg. 430
Agreement for Receipt of Grant Funds 7 Revised 01/02/2020 GRANT RECIPIENT:
San Carlos, CA 94070
Attention: Sajuti Haque
Address: _______
Attention: Contact Information
14. Non-Assignment. This Agreement is not assignable either in whole or in part.
15. Amendments. This Agreement may be amended or modified only by written agreement signed by both parties.
16. Validity. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the va lidity of any other provision of this Agreement.
17. Governing Law. This Agreement shall be governed by the laws of the State of California and any suit or acti on initiated by either party shall be brought in the County of San Mateo, Calif ornia. In the event of litigation between the parties hereto to enforce any provision of the Agreement, the unsuccessful party will pay the reason able attorney’s fees and expenses of litigation of the successful party.
18. Mediation. Should any dispute arise out of this Agreement, the parties shall meet in mediation and attempt to reach a resolution with the assistance of a mutually acceptable mediator. Neither party shall be permitted to file legal action without first meeting in mediation and making a good faith attempt to reach a mediated resolution. The costs of the mediator, if any, shall be paid equally by the parties. If a mediated settlement is reached neither party shall be deemed the prevailing party for purposes of the settlement and each party shall bear its own legal costs. If a party refuses or fails to participate in mediation in good faith prior to filing a lawsuit, then that par ty shall be barred from recovery of attorneys fees and costs of suit.
19. Entire Agreement. Each party acknowledges that this agreement, the exhibits hereto, and the documents inc orporated by reference herein constitute the complete agreement and exclusive statement of the terms and conditions between the parties, which supersedes and merges all prior proposals, understandings and all other agreements, verbal and written, between the parties relating to the subject matter of this agreement. This agreement may not be modified or altered except by written instrument duly executed by both parties.
10.a
August 12, 2024
Packet Pg. 431
Agreement for Receipt of Grant Funds 8 Revised 01/02/2020
[SIGNATURE PAGE TO FOLLOW]
10.a
August 12, 2024
Packet Pg. 432
Agreement Revised 03/14/2019
SIGNATURE PAGE
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date first above written by their respective officers duly authorized in that behalf.
CITY OF SAN CARLOS:
Dated: _________________________________ Jeff Maltbie, City Manager
ATTEST:
Dated: ________________________________ Crystal Mui, City Clerk
APPROVED AS TO FORM:
Dated:
Gregory J. Rubens, City Attorney
CONSULTANT/CONTRACTOR/VENDOR:
I acknowledge that I have full authority to execute this agreement on behalf of the Consultant/Contractor/Vendor, and have read, understand, and agree to comply with the provisions of this Agreement, including the Insurance and indemnity requirements set forth herein.
Dated:
10.a
August 12, 2024
Packet Pg. 433
Links to Additional Documents
Note: These are clickable links. If a paper copy is requested, please email [email protected].
1. Ordinance 1585: An Ordinance of the City Council of the City of San Carlos Adding Chapter 8.52 to the San Carlos Municipal Code Establishing a Childcare Development Impact Fee for New Nonresidential Developments in the City of San Carlos
2. Resolution 2022-104: A Resolution of the City Council of the City of San Carlos Establishing the Childcare Development Impact Fee Levels for New Nonresidential Developments in San Carlos and Adopting the Updated Childcare Impact Fee Nexus Study prepared by Economic & Planning Systems Inc. for the City of San Carlos dated September 9, 2022
3. Childcare Impact Fee Nexus Study (September 9, 2022)