Cities Index.
Agenda packet

San Clemente City Council
November 1, 2022

Document
Agenda packet
Meeting
November 1, 2022
Body
San Clemente City Council
Pages
71
Original file
91.0 MB
Text extracted from the city's file for reading and search. Open the original on san-clemente.legistar.com. That file is the official record.

60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
55452.01100\40788237.2
ATTACHMENT NO. 1

LEGAL DESCRIPTION OF THE PROPERTY

EXHIBIT A
287
01225.0005/692274.11 FG
Attachment No. 2

Page 1 of 1 ends

60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
55452.01100\40788237.2
ATTACHMENT NO. 2

FAIR SHARE FEES
Sidewalk fees?
Parks Development
fees?
Sewer Connection fees
Drainage Facilities fees
Water Acreage fees
Regional Circulation Financing and Phasing Program

EXHIBIT A
288
01225.0005/692274.11 FG
Attachment No. 3

Page 1 of 1 ends

60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
55452.01100\40788237.2
ATTACHMENT NO. 3

SITE PLAN

EXHIBIT A
289
Attachment No. 4

Page 1 of 1 ends

60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
01225.0005/692274.11 FG
60360956.v1
55452.01100\40788237.2
ATTACHMENT NO. 4

REQUIRED PUBLIC IMPROVEMENTS

EXHIBIT A
290
ATTACHMENT 3
Summary Tables
Table 1. Senior Housing Density Bonus Requests
Development
Standard Allowed Proposed Density Bonus Provision
Height / Stories 45’-0” /
3 Stories
Max. 51’-6” /
3 & 4 Stories
Concession - Govt
Code Section
65915(b)(1)(B) and
(d)(1)(A)
Elevator Shaft
Height
51’-0” 57’-9” Waiver - Govt Code
Section 65915(e)(1)
Floor Area Ratio 0.50 0.89 Waiver - Govt Code
Section 65915(e)(1)
Parking 249 covered
2 uncovered
50 guest spaces
249 covered
2 uncovered
23 guest spaces
Waiver - Govt Code
Section 65915(e)(1)
Open Space Private – 25,000 sf
Group – 25,000 sf
Private* – 14,610 sf
Group – 35,590 sf
Waiver - Govt Code
Section 65915(e)(1)
*Includes request to waive the requirement that all units have at least some private open space.

Table 2. Development Standards for Senior Housing Projects in Nonresidential Zones
Standard Zoning Ordinance Proposed
Complies with
the Code or
Density Bonus
Law (DB)*
Building Height
(Maximum):

By zone, or up to 45’ if
granted by exception
Building 1 – 51’-6”
Building 2 – 49’-6” Yes, DB
Lot Coverage
(Maximum) 80% 44% Yes, Code
Lot Size
(Minimum) 6,000 square feet 268,329 square feet Yes, Code Front Setback
(Minimum) 10’ 10’+ Yes, Code
Side Setback
(Minimum)
10’ adjacent to residential
0’ nonresidential 80’+ Yes, Code
Rear Setback
(Minimum)
5’ adjacent to residential
0’ nonresidential 142’ Yes, Code
Density Nonresidential zones – 45
du/ac 40.5 du/ac Yes, Code
291
ATTACHMENT 3
Standard Zoning Ordinance Proposed
Complies with
the Code or
Density Bonus
Law (DB)*
Floor Area
Ratio** 0.50 0.89 Yes, DB
Parking
(Minimum)
Manager’s – 2
Senior – 249 covered
Guest – 50
Manager’s – 2
Senior – 249 covered
Guest – 23 onsite, 42
shared
Yes, Code and DB
*See above discussion regarding Density Bonus requests
** Floor area ratio per underlying CC4 Zone
Table 3. Development Standards for Medical Office
in the CC4 Zone
Standard Zoning
Ordinance Proposed Complies with the Code
Lot Area
(Minimum) 6,000 square feet 16,117 square feet Yes
Lot Width
(Minimum) 60’-0” 148’ Yes
Front Setback
Minimum 0’-0” 10’+ Yes
Interior Side Setback
Minimum 0’-0” 45’+ Yes
Rear Setback
Minimum 0’-0” 46’+ Yes
Lot Coverage
(Maximum) 60% 20% Yes
Floor Area Ratio 0.50 0.37 Yes
Height Limitation (Maximum):

Top of Plate 37’-0” 26’ Yes
Top of Roof 45’-0” 36’ Yes
Stories 3 2 Yes
292
ATTACHMENT 3
Table 4. Required and Proposed Parking
Use SCMC Required
Parking*
Proposed
Parking
Senior Units 249 249
Manager’s Unit 2 2
Guest Spaces 50 44
Subtotal 301 295
Medical Office 38 22
Total 339 317
*SCMC requires 1/senior unit, 2/manager’s unit, 1/5 housing units, and 200/sf of medical office
293
ATTACHMENT 4
294
ATTACHMENT 4
295
ATTACHMENT 4
296
ATTACHMENT 4
297
ATTACHMENT 4
298
ATTACHMENT 4
299
ATTACHMENT 4
300
61008923.v1
September 27, 2022
Jennifer Savage, AICP/CTP
Assistant to the City Manager
City of San Clemente
9100 Calle Negocio
San Clemente, CA 92673
Re: Master Project (MP) 22-089 (Senior Citizen Housing and Medical Office Building) – Incentives or Concessions and Waivers or Reductions of Development Standards
Dear Ms. Savage:

We continue to represent Saddleback Memorial Medical Center (“Saddleback”) with regard to all matters related to Master Project (MP) 22-089 which includes, among other matters, various land use entitlement applications for a 250 unit senior citizen housing complex and a 7,500 square foot medical office building at 654 Camino de los Mares (“Project”). The purposes of this letter are to further memorialize and specify Saddleback’s requests for incentives or concessions from and waivers or reductions of certain development standards as mandated by Government Code Section 65915, subdivisions (b), (d), and (e) that would otherwise be applicable to the senior citizen housing portion of the Project.

By letter of August 31, 2022, Mr. Ted D. Frattone of Hunsaker & Associates Irvine, Inc., the Project manager for planning and entitlements, requested “applicable development incentives or concessions associated with the project’s commitment to provide 5% of the proposed senior residential units (13 units) as very low income households in accordance with the Density Bonus Law [the commonly used term for Section 65915].” As you are aware, Section 65915, subdivision (d), paragraph (2), subparagraph (A) provides that the City of San Clemente (“City”) must grant “One incentive or concession for projects that include . . . at least 5 percent [of the units] for very low income households . . ..” As the letter explains, thirteen (13) of the senior citizen units, which equals five (5) percent of the 250 units Included within the senior citizen housing portion of the Project, will be dedicated for rent to very low income households (as defined in Section 65915). In addition, it is noteworthy that the senior citizen housing portion of the Project also qualifies for incentives or concessions (as well as waivers or reductions of development standards) pursuant to Section 66915, subdivision (b), paragraph (1), subparagraph (C) because the senior citizen housing complex is a qualified senior citizen housing project.

Therefore, in accordance with Section 65915, subdivision (b), paragraph (1), subparagraphs (B) and (C) and subdivision (d), paragraph (1), Saddleback hereby requests a

ATTORNEYS AT LAW
18101 Von Karman Avenue
Suite 1800
Irvine, CA 92612
T 949.833.7800
F 949.833.7878
Gregory W. Sanders
D 949.477.7669
[email protected]
Refer To File # 504163-0001

VIA HAND DELIVERY
ATTACHMENT 5
301
September 27, 2022

Page 2 ends

61008923.v1
concession from the forty-five foot/thirty-seven foot plate/3 story height limitation imposed by the Community Commercial 4 (CC 4) zone to the heights set forth in the Development Standards Matrix, San Clemente Senior Housing and Health Center, Master Project (MP) 22-089, dated September 26, 2022 submitted to you by Mr. Frattone (copy enclosed) (“Development Standards Matrix”).

In addition to the foregoing, the City has been informed by Saddleback orally and in writing that strict application of certain development standards found in the City’s Municipal Code, design guidelines and elsewhere would preclude construction of the senior citizen housing portion of the Project. As you are further aware, Section 65915, subdivision (e), paragraph (1), provides that the City may not “apply any development standard that will have the effect of physically precluding construction of a development meeting the criteria of subdivision (b) [which includes the senior housing portion of the Project] at the densities or with the concessions or incentives permitted under this section . . ..” “Development standard” is defined in Section 65915, subdivision (o), paragraph (1) to include, but not limited to, a height limitation, a setback requirement, a floor area ratio, an onsite open space requirement or a parking ratio that applies to a residential development pursuant to any ordinance, general plan element, specific plan, charter, or other local condition, law, policy, resolution, or regulation.” Therefore, Saddleback hereby requests waivers or reductions from all City Municipal Code provisions, development guidelines, ordinances, general plan elements, specific plans, and all other laws, policies, resolutions and regulations of the floor area ratio, onsite open space, parking development standards and the additional height of the buildings caused by the protrusion from the roofs of the elevator shafts and equipment that would otherwise apply to the senior citizen housing portion of the Project, all as set forth in the Development Standards Matrix.

Please let us know if you need any further information regarding this matter.

Sincerely,
Gregory W. Sanders
Nossaman LLP
GWS:jg
ATTACHMENT 21
302
Development Standards Matrix
San Clemente Senior Housing & Health Center
Master Project MP22-089
September 26, 2022
Development
Standard
CC4 Zone
Requirement
Senior Housing
Projects Requirement
Proposed Project Required Exception &
Findings
Minimum Lot Area 6,000 sq. ft. 6,000 sq. ft.

Senior Housing – 268,408 sq. ft.

Health Center – 20,387 sq. ft.

None
Minimum Lot Width 60 ft. -
Senior Housing – 500 ft.

Health Center – 145 ft.

None
Minimum Front Setback 0 ft. 10 ft.

Senior Housing – 15.5 ft.

Carports – 10 ft.

Health Center – 14 ft.

None
Minimum Interior Side
Setback 0 ft. 0 ft.

Senior Housing – 46 ft.

Carports - 0 ft.

Health Center – 44.5 ft.

None
Minimum Street Side
Setback 0 ft. - n/a None
Minimum Rear Setback 0 ft. 0 ft.

Senior Housing – 143.5 ft.

Carports – 35 ft.

Health Center – 46 ft.

None
Maximum Lot Coverage 60% of Lot Area 80% of Lot Area
Senior Housing – 44%
Health Center – 20% None
Floor Area Ratio 0.50 0.50
Senior Housing – 0.89
Health Center – 0.37
Two Alternatives:
(1) CC4 zone allows the
applicant to seek exception to
FAR (up to 2.0 FAR) for a senior
project.
(2) State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
Residential Density (dwelling
units per acre) - 45 dwelling units per acre
Senior Housing – 40.6 dwelling
units per acre
Health Center – n/a
None
Height Limitation
45 ft. Top of Roof;
37 ft. Plate;
3 Stories
45 ft. Top of Roof;
37 ft. Plate;
3 Stories
Senior Housing:

Building 1
Max. Height (4th Story) – 51’-6”
Max. Plate (4th Story) – 43’-3”
# of Stories – 3 & 4
Building 2
Max. Height – 49’-6”
Max. Plate – 40’-4”
# of Stories – 3 & 4
Health Center:

Top of Roof – 32’-6”’
Plate – 26’
# of Stories – 2
State Density Bonus Law
Development Standards
Concession or Incentive (GC
65915 (d))
Elevator Shaft Height
51 ft. (6 ft. above maximum
building height of 45 ft. per
Table 17.24.080B, SC
Zoning Code – Section

17.24.080)
51 ft. (6 ft. above maximum
building height of 45 ft. per
Table 17.24.080B, SC
Zoning Code – Section

17.24.080)
Senior Housing:

Building 1
Elevator Shaft – 56’-2”
Building 2
Elevator Shaft – 57’-9”
Health Center:

Elevator Shaft – less than 45 ft.

Senior Housing:

State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
Health Center: None
Parking Medical Office - 1 space per
200 sq. ft.

Manager’s unit – 2 spaces
per unit (uncovered)
Senior units – 1 space per
unit (covered)
Guest Spaces – 1 space per
5 units or 0.2 spaces per
unit (Manager’s & Senior
units)
Senior Housing:

Manager’s unit – 2 spaces per
unit (uncovered) / 2 spaces
Senior units – 1 space per unit
(covered) / 249 covered spaces
Guest Spaces – 0.092 space per
unit (Manager’s & Senior units) /
23 spaces*
Health Center:
1 space per 200 sq. ft. /
38 spaces*
*Shared Parking (Senior Guest
Spaces & Health Center):
61 shared spaces
Two Alternatives:
(1) Exceptions to parking
requirements substantiated by
a parking study may be
approved through the
discretionary review required
for a senior housing project (SC
Zoning Code - Section

17.28.280);
Shared Parking (SC Zoning
Code -Section 17.64.120
(2) State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
Percentage of Total Parking
Area to be Landscaped (50+
stalls)
12% 12% 12% None
Open Space (Design
Guideline)**
** Not a zoning requirement
-
Private Open Space: 100 sq.
ft. per unit / 25,000 sq. ft.

Group Open Space: 100 sq.
ft. per unit / 25,000 sq. ft.

Private Open Space: 14,610 sq.
ft.***
Group Open Space: 35,590 sq. ft.

Total Open Space: 50,200 sq. ft.
***200 units have private open
space
Two Alternatives:
(1) Design Guidelines allow for
common/group open space to
be substituted for 64 sq. ft. of
the 100 sq .ft. of private open
space per unit.
(2) State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
ATTACHMENT 21
303
Thomas J. Leary
Senior Vice President & Chief Legal Officer
[email protected]
T 714.377.3245
F 714.377.3246
17360 Brookhurst Street
Fountain Valley, California 92708
memorialcare.org
September 28, 2022
Via Email ([email protected])
Ms. Jennifer Savage, AICP, CTP
Assistant to the City Manager
City of San Clemente
910 Calle Negocio
San Clemente, California 92673
Re: Master Project MP22-089, 654 Camino De Los Mares, San Clemente, California Dear Ms. Savage:

This letter is submitted with reference to Master Project MP22-089, General Plan Amendment GPA22-097, Site Plan Permit SPP22-103, Tentative Parcel Map TPM22-099, Zoning Amendment ZA22-098, Architectural Permit AP22-101, Conditional Use Permit CUP22-100 and related applications with respect to the proposed development of a mixed-use project with 250 for-rent senior residential units and a 7,500 square foot medical office at 654 Camino de los Mares in San Clemente, California (collectively, the “Application”).

You have asked us to provide reasons for our request for the incentives, concessions, waivers and reductions of the City’s development standards relating to the Application, as identified in the Development Standards Matrix, San Clemente Senior Housing and Health Center, Master Project (MP) 22-089, dated September 26, 2022 and submitted to you by Mr. Ted Frattone in the form enclosed with this letter (collectively, the “Incentives and Waivers”), and as such are required to be granted by the City under California Government Code Section 65915 (the “Density Bonus Law”).

Among the Incentives and Waivers requested by the Applicant and required under the Density Bonus Law are relief from the City’s design standards associated with building height limitations, elevator shaft height limitations, floor area ratios, parking ratios, and private and group open space standards.

The Incentives and Waivers are required to enable the project to accommodate the number of units sought by the Applicant and to create sufficient parking for the project’s residential units and medical office building, given the physical and topographical constraints of the subject property.

To make the project financially feasible, and to justify the investment necessary to design, build and operate the project, the rents to be generated by the project must be sufficient to pay for the ATTACHMENT 6
304
Ms. Jennifer Savage
September 28, 2022

Page 2 ends

land value, hard and soft construction costs, financing costs, and the costs and expenses of marketing, leasing and operating the property. Particularly given that the City will require from the project a number of affordable units, the units provided for in the Application will also create a source of revenue sufficient to support those costs and expenses, as well as the subsidy necessary to offset the financial impact of the designated affordable units.

While, nationwide, increases in the consumer price index are approaching 9% per annum, hard construction costs (for such things as concrete, steel, wood, drywall and labor) are rising even faster. CBRE’s Construction Cost Index projects a 14.1% year-over-year increase through the end of 2022. As inflation accelerates, interest rates, which govern construction borrowing costs, have risen too. A median bank construction borrowing rate today would be approximately 6.50%, up several hundred basis points from 2021. Other factors, including rising soft costs (costs of, for example, design, engineering, applications and permits) and international supply chain problems, have made real estate projects of all kinds more expensive and riskier.

The project’s anticipated cost of construction, at around $84,000,000, are high and likely to increase. Reducing the number of units would reduce available residential revenues, and our design professionals point out that construction costs are unlikely to be reduced proportionately to compensate for the loss in revenue. Ensuring that the project is planned with the critical mass of units provided for in the Application, which number is achievable only with the Incentives and Waivers, will better ensure that the construction and other project and operating costs are paid for by an adequate number of rent-producing apartments. Moreover, spreading the construction costs across a larger number of units will ultimately help to improve the affordability of those units to all renters.

We acknowledge that, as construction costs have risen consistently over the last few years, rents in Southern California have largely kept pace with those increases. We believe, however, that this trend is unlikely to continue. Among the primary goals of the Federal Reserve in pushing up interest rates as much as it has this year is to dampen wage growth. Weak wage growth, or wage stagnation, will reduce the rents tenants can afford. In addition, with inflation rising, seniors on fixed incomes will spend more for life’s basic needs, putting further downward pressure on rents in the process.

Higher construction and financing costs alongside weaker rent growth will challenge this project.

Finally, the number of senior apartment builders in the United States is smaller than the number of non-age-restricted apartment builders by as much as one-half. The senior housing market’s limited size amplifies design and economic concerns simply because fewer bidders are available to compete for property. Any perception that the number of units in a project might be insufficient to pay for construction and other project and operating costs, together with a reasonable margin ATTACHMENT 22
305
Ms. Jennifer Savage
September 28, 2022

Page 3 ends

to protect an owner/operator from risks associated with market conditions and economic instability, can disproportionately affect the economic viability of a project and the prospects for it to move from the design stage to reality.

We believe this project is right for San Clemente. It will create inviting, beautiful apartment homes for seniors, and allow them to stay and thrive in San Clemente, near their children and grandchildren, and enjoy all that the City has to offer. In addition, it will help the City meet its obligations under applicable state residential and affordable housing laws, which has been a goal and key driver of this project from the outset. The Incentives and Waivers are necessary to ensure the project’s feasibility and to enhance its prospects for success and service to the community.

Very truly yours,
Thomas J. Leary
Senior Vice President & Chief Legal Officer
Memorial Health Services
on behalf of MemorialCare Saddleback Medical Center
ATTACHMENT 22
306
Development Standards Matrix
San Clemente Senior Housing & Health Center
Master Project MP22-089
September 26, 2022
Development
Standard
CC4 Zone
Requirement
Senior Housing
Projects Requirement
Proposed Project Required Exception &
Findings
Minimum Lot Area 6,000 sq. ft. 6,000 sq. ft.

Senior Housing – 268,408 sq. ft.

Health Center – 20,387 sq. ft.

None
Minimum Lot Width 60 ft. -
Senior Housing – 500 ft.

Health Center – 145 ft.

None
Minimum Front Setback 0 ft. 10 ft.

Senior Housing – 15.5 ft.

Carports – 10 ft.

Health Center – 14 ft.

None
Minimum Interior Side
Setback 0 ft. 0 ft.

Senior Housing – 46 ft.

Carports - 0 ft.

Health Center – 44.5 ft.

None
Minimum Street Side
Setback 0 ft. - n/a None
Minimum Rear Setback 0 ft. 0 ft.

Senior Housing – 143.5 ft.

Carports – 35 ft.

Health Center – 46 ft.

None
Maximum Lot Coverage 60% of Lot Area 80% of Lot Area
Senior Housing – 44%
Health Center – 20% None
Floor Area Ratio 0.50 0.50
Senior Housing – 0.89
Health Center – 0.37
Two Alternatives:
(1) CC4 zone allows the
applicant to seek exception to
FAR (up to 2.0 FAR) for a senior
project.
(2) State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
Residential Density (dwelling
units per acre) - 45 dwelling units per acre
Senior Housing – 40.6 dwelling
units per acre
Health Center – n/a
None
Height Limitation
45 ft. Top of Roof;
37 ft. Plate;
3 Stories
45 ft. Top of Roof;
37 ft. Plate;
3 Stories
Senior Housing:

Building 1
Max. Height (4th Story) – 51’-6”
Max. Plate (4th Story) – 43’-3”
# of Stories – 3 & 4
Building 2
Max. Height – 49’-6”
Max. Plate – 40’-4”
# of Stories – 3 & 4
Health Center:

Top of Roof – 32’-6”’
Plate – 26’
# of Stories – 2
State Density Bonus Law
Development Standards
Concession or Incentive (GC
65915 (d))
Elevator Shaft Height
51 ft. (6 ft. above maximum
building height of 45 ft. per
Table 17.24.080B, SC
Zoning Code – Section

17.24.080)
51 ft. (6 ft. above maximum
building height of 45 ft. per
Table 17.24.080B, SC
Zoning Code – Section

17.24.080)
Senior Housing:

Building 1
Elevator Shaft – 56’-2”
Building 2
Elevator Shaft – 57’-9”
Health Center:

Elevator Shaft – less than 45 ft.

Senior Housing:

State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
Health Center: None
Parking Medical Office - 1 space per
200 sq. ft.

Manager’s unit – 2 spaces
per unit (uncovered)
Senior units – 1 space per
unit (covered)
Guest Spaces – 1 space per
5 units or 0.2 spaces per
unit (Manager’s & Senior
units)
Senior Housing:

Manager’s unit – 2 spaces per
unit (uncovered) / 2 spaces
Senior units – 1 space per unit
(covered) / 249 covered spaces
Guest Spaces – 0.092 space per
unit (Manager’s & Senior units) /
23 spaces*
Health Center:
1 space per 200 sq. ft. /
38 spaces*
*Shared Parking (Senior Guest
Spaces & Health Center):
61 shared spaces
Two Alternatives:
(1) Exceptions to parking
requirements substantiated by
a parking study may be
approved through the
discretionary review required
for a senior housing project (SC
Zoning Code - Section

17.28.280);
Shared Parking (SC Zoning
Code -Section 17.64.120
(2) State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
Percentage of Total Parking
Area to be Landscaped (50+
stalls)
12% 12% 12% None
Open Space (Design
Guideline)**
** Not a zoning requirement
-
Private Open Space: 100 sq.
ft. per unit / 25,000 sq. ft.

Group Open Space: 100 sq.
ft. per unit / 25,000 sq. ft.

Private Open Space: 14,610 sq.
ft.***
Group Open Space: 35,590 sq. ft.

Total Open Space: 50,200 sq. ft.
***200 units have private open
space
Two Alternatives:
(1) Design Guidelines allow for
common/group open space to
be substituted for 64 sq. ft. of
the 100 sq .ft. of private open
space per unit.
(2) State Density Bonus Law
Development Standards
Waiver (GC 65915 (d) and (e))
ATTACHMENT 22
307
60870363.v1
September 8, 2022
Scott McKhann, Chair and
Members of the Planning Commission
City of San Clemente
910 Calle Negocio
San Clemente, CA 92673
Re: Saddleback Memorial Medical Center Land Use Entitlement and Development Agreement Applications for Real Property at 654 Camino de Los Mares – State Law Preemption and CEQA Compliance (September 21, 2022 Planning Commission Meeting)
Dear Chair McKhann and Members of the Planning Commission:

We represent Saddleback Memorial Medical Center (“Saddleback”) with regard to all matters pertaining to applications for General Plan Amendment GPA 22-097; Zoning Amendment ZA22-098; Vesting Tentative Parcel Map TPM22-099; Architectural Permit AP22- 101; Site Plan Permit SPP22-103; Conditional Use Permit CUP22-100; and a Development Agreement for the above referenced property (“Property”) for development of a 250 unit senior citizen housing complex and medical office building (“the Project”). The purposes of this letter are to advise you of a) the requirements of state law that preempt various provisions of the City of San Clemente Zoning Code (San Clemente Muni. Code, tit. 17) (“Zoning Code”) otherwise applicable to the Project; and b) compliance of the Project with the California Environmental Quality Act (Pub. Res. Code § 21000, et seq.) (“CEQA”).

I. Government Code Section 65915 Preemption.

As discussed below, various provisions of Government Code Section 65915 preempt a number of requirements of the Zoning Code. As further discussed below, the preemption applies to densities and other development standards that would otherwise apply to the Project.

Government Code Section 65915, subdivision (b)(1) provides, in pertinent part, that “A city . . . shall grant one density bonus and, if requested by the applicant . . . incentives or concessions, as described in subdivision (d), waivers or reductions of development standards, as described in subdivision (e), and parking ratios, as described in subdivision (p), if an applicant . . . seeks and agrees to construct a housing development . . . that will contain at least any one of the following: (B) Five percent of the total units of a housing development for rental or sale to very low income households, as defined in Section 50105 of the Health and Safety Code. [or] (C) A senior citizen housing development, as defined in Section 51.3 and 51.12 of the Civil Code . . ..” The Project qualifies for a density bonus and incentives and concessions, etc. by virtue of the

ATTORNEYS AT LAW
18101 Von Karman Avenue
Suite 1800
Irvine, CA 92612
T 949.833.7800
F 949.833.7878
Gregory W. Sanders
D 949.477.7669
[email protected]
Refer To File # 504163-0001
ATTACHMENT 7
308
September 8, 2022

Page 2 ends

60870363.v1
facts that it will a) contain thirteen (13) units for rental or sale to lower income households as defined in Health and Safety Code Section 50105 which constitutes five (5) percent of the total number of Project dwelling units; and b) qualify as a senior citizen housing development, as defined in Sections 51.3 and 51.12 of the Civil Code (all of the units, with the possible exception of one (1) manager’s unit, will be rented or sold to qualifying senior citizens and senior citizen households).

Under Government Code Section 65915, subdivision (d)(2)(A), an applicant “shall receive . . . one incentive or concession for projects that include . . . at least 5 percent for very low income households . . ..” As such, the Project qualifies for one (1) incentive or concession. An “incentive or concession” is defined to include “a reduction in site development standards or a modification of zoning code requirements or architectural design requirements . . ..” (Gov. Code §65915, subd. (k)(1).) A development standard is defined to include “a site or construction condition, including, but not limited to, a height limitation, a setback requirement, a floor area ratio, an onsite open-space requirement, or a parking ratio that applies to a residential development . . ..” (Gov. Code § 65915, subd. (o)(1), italics added.) As part of the land use entitlement application package, Saddleback has submitted application ZA22-098 to change the zoning for the Property from RMF to CC 4. As set forth in Table 17.36.030J of the Zoning Code, the “Height Limitation” development standard in the CC 4 zone is 45’0” Top of Roof; 37’0” Plate; 3 stories (all expressed as one development standard) (“Height Limitation Standard”).

Saddleback has chosen to use its one (1) incentive or concession with respect to the Height Limitation Standard. Thus, in accordance with the preemption requirements discussed in this paragraph, the Project is relieved from compliance with the Height Limitation Standard.

Further, Government Code Section 65915, subdivision (e)(1), provides that “in no case may a city . . . apply any development standard that will have the effect of physically precluding the construction of a development meeting the criteria of subdivision (b) at the densities or with the concessions or incentives permitted by this section.” The Project qualifies for this preemption because a) five (5) percent of its units will be rented or sold to very low income households; and b) it constitutes a development for senior citizens, as discussed above. Further as discussed above, the City is required to grant the Project “waivers or reductions of development standards, as described in subdivision (e), and parking ratios, as described in subdivision (p) . . ..” (Gov.

Code § 65915, subd. (b)(1).) Thus, separate and apart from the one (1) incentive or concession that the Project is entitled to, the City is preempted by state law from applying any development standard that would preclude construction of the Project. We note that Government Code Section 65951, subdivision (e)(1) also provides that “if a court finds that the refusal [by a city] to grant a waiver or reduction of development standards is in violation of this section, the court shall award the plaintiff reasonable attorney’s fees and costs of suit.” II. Project CEQA Compliance.

The Property was included with a number of other potential affordable housing sites analyzed in a Program Environmental Impact Report (“Program EIR”) recently adopted by the City in compliance with CEQA Guidelines Section 15168 in connection with adoption of an update to the City’s General Plan Housing Element. The City has decided to prepare an addendum to the Program EIR for the Project in order to satisfy the requirements of CEQA.

ATTACHMENT 23
309
September 8, 2022

Page 3 ends

60870363.v1
In a letter to members of the San Clemente City Council and Planning Commission (meeting jointly for a study session on the Project on August 31, 2022) the Sea Pointe Estates Homeowners Association Board of Directors alleged that CEQA requires a public review (presumably the same review afforded environmental impact reports, etc., by the CEQA Guidelines) of the CEQA documents related to the Project which, as discussed above, consists of an addendum. CEQA Guidelines Section 15164, subdivision (c), provides that “An addendum need not be circulated for public review . . ..” The public will have ample opportunity to review and comment on the addendum prior to and at the Planning Commission meeting at which the Project will be considered for approval.

We will be present with the Saddleback team to answer any questions you have regarding the issues addressed in this letter and address any other issues that arise.

Respectfully submitted,
Gregory W. Sanders
Nossaman LLP
GWS:jg
ATTACHMENT 23
310
60989654.v1
September 15, 2022
Scott Smith
City of San Clemente, City Attorney
c/o Best Best & Krieger
Attorneys at Law
18101 Von Karman Ave., Ste. 1000
Irvine, CA 92612
Re: MemorialCare Project – MP22-089 – Waiver or Reduction of Parking Ratio Dear Mr. Smith:

City Staff recently asked if state law required waiving or reducing the City’s parking ratio to the extent application of that requirement would physically preclude construction of MemorialCare’s project. The answer is yes.

The City’s parking ratio is a development standard under California’s Density Bonus Law, Government Code §§ 65915-65918. Specifically, a development standard is defined to include “a site or construction condition, including, but not limited to, a height limitation, a setback requirement, a floor area ratio, an onsite open-space requirement, or a parking ratio that applies to a residential development . . . , or other local condition, law, policy, resolution, or regulation.” (Gov. Code, § 65915, subd. (o)(1), underlining added.) Government Code section 65915, subdivision (e)(1), states that “[i]n no case may a city . . . apply any development standard that will have the effect of physically precluding the construction of a development meeting the criteria of subdivision (b) at the densities or with the concessions or incentives permitted by this section.” MemorialCare’s project meets the criteria of subdivision (b). (See, e.g., Gov. Code, § 65915, subd. (b)(1)(C) [“A senior citizen housing development, as defined in Sections 51.3 and 51.12 of the Civil Code”].)
Thus, because application of the City’s parking ratio would preclude construction of MemorialCare’s project as presently designed, it must be reduced or waived. (Bankers Hill 150 v. City of San Diego (2022) 74 Cal.App.5th 755, 774 [developer “was entitled under the Density Bonus Law to a waiver of any development standard that would have the effect of physically precluding the construction of the Project at the permitted density and with the requested incentive”]; Wollmer v. City of Berkeley (2011) 193 Cal.App.4th 1329, 1346-1347 [city required to waive standards for height, number of stories and setbacks, and grant variances to allow an additional story and a higher building height, because otherwise construction of a housing development meeting the requirements for a density bonus would’ve been physically precluded].)

ATTORNEYS AT LAW
18101 Von Karman Avenue
Suite 1800
Irvine, CA 92612
T 949.833.7800
F 949.833.7878
Gregory W. Sanders
D 949.477.7669
[email protected]
VIA EMAIL Refer To File # 504163.0001
ATTACHMENT 8
311
Scott Smith
September 15, 2022

Page 2 ends

60989654.v1
If you think it would be helpful, I am happy to schedule a call to discuss these issues further. Please just let me know your availability.

Very truly yours,
Gregory W. Sanders
Nossaman LLP
GWS:

ATTACHMENT 24
312

CARLSBAD
CLOVIS
IRVINE

LOS ANGELES

PALM SPRINGS

POINT RICHMOND

RIVERSIDE

ROSEVILLE

SAN LUIS OBISPO
20 Executive Park, Suite 200, Irvine, California  92614     949.553.0666     www.lsa.net

MEMORANDUM
DATE: August 16, 2022
TO: Thomas J. Leary, MemorialCare Health System
FROM: Ken Wilhelm, Principal, LSA
SUBJECT: Parking Analysis for San Clemente Senior Housing/Medical Office Project LSA has prepared this parking analysis for the proposed San Clemente Senior Housing/Medical Office project (project) at 654 Camino De Los Mares in the City of San Clemente (City), California.

The purpose of this memorandum is to determine whether the proposed project would comply with the City’s Off‐Street Parking Requirements.

PROJECT DESCRIPTION
The project site currently contains a vacant hospital. The proposed project includes the demolition of the existing, vacant hospital and the construction of 250 dwelling units of senior housing (including one manager’s unit) and 7,500 square feet (sf) of medical office use. The project would provide a total of 312 parking spaces on site, which includes 251 parking spaces reserved for the senior residents (including the manager’s unit), and 61 parking spaces shared between the medical office building and guests of the residents (including the manager’s unit). Access to the project would be provided via existing signalized and unsignalized driveways along Camino De Los Mares.

CITY MUNICIPAL CODE REQUIREMENTS
LSA prepared an analysis based on the City of San Clemente Municipal Code for Off‐Street Parking Requirements. The senior housing parking requirements were based on Municipal Code Section

17.28.280 and the medical office use was based on Municipal Code Section 17.64.050 to determine the parking spaces required for the proposed project.

Table A (all tables attached) provides a breakdown of parking rates per land use and the total required parking per City Code of each component of the project. As shown in Table A, the project would require 301 parking spaces for the senior housing component (including the residents, manager’s unit, and guests) and 38 parking spaces for the medical office building. The total parking required per City Code is 339 parking spaces.

The proposed project would meet the Municipal Code requirements for the senior housing component (residents and manager’s unit) and the medical office building. The City’s requirement for guest parking for the senior housing units is 50 spaces. The project would provide 23 spaces dedicated for guest parking. The remainder of guest parking would be shared with the medical office parking spaces. The peak parking demand for different land uses can occur during different times of ATTACHMENT 9
313
8/17/22 (\\lsaazfiles.file.core.windows.net\projects\MEA2201\Doc\Parking\Shared Parking Memo.docx)   2 the day. As such, there is an opportunity for shared parking between the guest parking and medical office uses.

City Municipal Code Section 17.64.120 describes the ability to share parking spaces for mixed‐use projects.  Specifically, the Code states:

In all nonresidential and mixed‐use zones, private parking facilities may be shared by multiple uses whose activities are not normally conducted during the same hours, or when hours of peak use vary. The applicant shall have the burden of proof for a reduction in the total number of required off‐street parking spaces.

Per the City’s Municipal Code, the parking study should result in the following findings:

1. Given the specific conditions of the site and the adjacent area, the shared parking arrangement would not result in inadequate parking; and

2. The number of parking spaces required for the site, in accordance with Municipal Code Section 17.64.050(B), Number of Parking Spaces Required, is provided through the shared parking arrangement, based on varied hours of operation and/or combinations of peak and oft‐peak uses.

SHARED PARKING ANALYSIS METHODOLOGY
Shared parking is the use of a parking space to serve two or more individual land uses without conflict because of variations in the (parking) accumulation of vehicles by hour, by day (ULI Shared Parking 2020). LSA conducted a shared parking analysis consistent with the methodology presented in the Urban Land Institute’s (ULI) Shared Parking to determine whether the peak senior housing guest parking demand and the peak medical office parking demand can be accommodated based on the shared parking supply proposed on site.

The projected parking utilization for the proposed senior housing guests and medical office uses was calculated using the methodology presented in Shared Parking (ULI 2020). The percentage of utilization was obtained from Shared Parking for resident guests and medical office uses and applied to the required number of parking spaces per the City’s Municipal Code.

The total projected demand was calculated against the proposed shared parking supply (61 spaces) to determine the expected parking utilization per hour. Tables B and C show the peak parking utilization of the proposed guest/medical office components for a typical weekday and weekend, respectively. The number of residual or deficient parking stalls was also identified per scenario.

PARKING ADEQUACY FINDINGS
Weekday Analysis
The peak weekday utilization of the combined resident guest and medical office uses occurs at 7:00 p.m. when 61 spaces are occupied. Based on the proposed parking supply of 61 shared stalls, the parking supply would accommodate the peak parking demand. As a result, adequate parking supply would be provided during the weekday.

ATTACHMENT 9
314
8/17/22 (\\lsaazfiles.file.core.windows.net\projects\MEA2201\Doc\Parking\Shared Parking Memo.docx)   3 Weekend Analysis
The peak weekend utilization of the combined resident guest and medical office uses occurs between 7:00 p.m. and 10:00 p.m. when 50 spaces are occupied. Based on the proposed parking supply of 61 shared stalls, a residual of 11 stalls is expected. As a result, adequate parking supply would be provided during the weekend.

City Municipal Code Shared Parking Findings
The shared parking arrangement between the resident guests and medical office uses would not result in inadequate parking.  Furthermore, the number of parking spaces required for the site is provided through the shared parking arrangement between the two uses, based on varied hours of operation and/or combinations of peak and oft‐peak uses.  As such, the project meets the findings of the City’s shared parking requirements (Municipal Code Section 17.64.120).

CONCLUSIONS
The shared parking analysis demonstrates that the proposed parking supply of 312 spaces, including 61 spaces shared between guests of the residents and the medical office building, would adequately accommodate the expected parking demand during the weekday and weekend.

Attachments:  Tables A–C
ATTACHMENT 9
315
Land Use Quantity Parking Ratio 1 Parking Required Parking Provided Senior Housing Apartments 249 units 1 covered parking space per residential dwellilng unit. 249 249 Manager's Unit 1 unit 2 parking spaces 22
Senior Housing Guests ‐‐‐ 1 guest parking space for each five dwelling units (including Manager's Unit) 50 23 2 Medical office building 7,500 sf 1 space per 200 sf 38 38 Total Parking Spaces: 339 312
Notes:
1 Parking for Senior Housing Projects (Section 17.28.280) Parking for Medical Office (Section 17.64.050)
2 Senior guest parking spaces shared with Medical Office use. Total shared spaces = 61 spaces.

Table A: City Parking Requirement

ATTACHMENT
9 316
Size = 7,500 sf
Demand1 = 50 spaces Demand1 = 38 spaces
Residual/
Time Spaces Spaces Utilized Provided (Deficit)
8:00 AM 10 34 44 61 17
9:00 AM 10 34 44 61 17
10:00 AM 10 38 48 61 13
11:00 AM 10 38 48 61 13
12:00 PM 10 11 21 61 40
1:00 PM 10 34 44 61 17
2:00 PM 10 38 48 61 13
3:00 PM 10 38 48 61 13
4:00 PM 10 34 44 61 17
5:00 PM 20 30 50 61 11
6:00 PM 30 25 55 61 5
7:00 PM 50 11 61 61 0
8:00 PM 50 6 56 61 5
9:00 PM 50 0 50 61 11
10:00 PM 50 0 50 61 11
11:00 PM 40 0 40 61 21
Peak Shared Parking Demand 61
Parking Supply 61
Residual / (Deficit) 0 1
Parking demand referenced from the City of San Clemente Municipal Code, Chapters 17.28.280 and 17.64.050 DU = dwelling unit
sf = square feet
Spaces
Table B: Shared Parking Analysis ‐ Weekday
Weekday
Senior Housing Guests Medical Office
% Utilization 2 % Utilization 2
20% 90%
20% 90%
20% 100%
20% 100%
20% 30%
20% 90%
20% 100%
20% 100%
20% 90%
40% 80%
60% 67%
100% 30%
100% 15%
100% 0%
100% 0%
80% 0%
2 Time‐of‐Day Factors referenced from Shared Parking, Third Edition , Urban Land Institute, 2020.

ATTACHMENT 9
317
Size = 7,500 sf
Demand1 = 50 spaces Demand1 = 38 spaces
Residual/
Time Spaces Spaces Utilized Provided (Deficit)
8:00 AM 10 34 44 61 17
9:00 AM 10 34 44 61 17
10:00 AM 10 38 48 61 13
11:00 AM 10 38 48 61 13
12:00 PM 10 11 21 61 40
1:00 PM 10 0 10 61 51
2:00 PM 10 0 10 61 51
3:00 PM 10 0 10 61 51
4:00 PM 10 0 10 61 51
5:00 PM 20 0 20 61 41
6:00 PM 30 0 30 61 31
7:00 PM 50 0 50 61 11
8:00 PM 50 0 50 61 11
9:00 PM 50 0 50 61 11
10:00 PM 50 0 50 61 11
11:00 PM 40 0 40 61 21
Peak Shared Parking Demand 50
Parking Supply 61
Residual / (Deficit) 11 1
Parking demand referenced from the City of San Clemente Municipal Code, Chapters 17.28.280 and 17.64.050 DU = dwelling unit
sf = square feet
Spaces
Table C: Shared Parking Analysis ‐ Weekend
Weekend
Senior Housing Guests Medical Office
% Utilization 2 % Utilization 2
20% 90%
20% 90%
20% 100%
20% 100%
20% 30%
20% 0%
20% 0%
20% 0%
20% 0%
40% 0%
60% 0%
100% 0%
100% 0%
100% 0%
100% 0%
80% 0%
2 Time‐of‐Day Factors referenced from Shared Parking, Third Edition , Urban Land Institute, 2020.

ATTACHMENT 9
318

CARLSBAD
CLOVIS
IRVINE

LOS ANGELES

PALM SPRINGS

POINT RICHMOND

RIVERSIDE

ROSEVILLE

SAN LUIS OBISPO
20 Executive Park, Suite 200, Irvine, California  92614     949.553.0666     www.lsa.net

MEMORANDUM
DATE: September 21, 2022
TO: Thomas J. Leary, MemorialCare Health System
FROM: Ken Wilhelm, Principal, LSA
SUBJECT: Supplemental Parking Analysis for San Clemente Senior Housing/Medical Office Project
LSA prepared a parking analysis for the proposed San Clemente Senior Housing/Medical Office project (project) at 654 Camino De Los Mares in San Clemente, California. The purpose of the analysis was to determine whether the proposed project would comply with the City of San Clemente’s (City) Off‐Street Parking Requirements. The analysis was completed on August 16, 2022.

On August 31, 2022, the City held a joint Study Session with the City Council and Planning Commission members. Several members had questions about parking and whether the project would provide adequate parking spaces to accommodate peak demand.

This memorandum summarizes the conclusions of the parking analysis and provides additional information to support the parking proposed for the project.

SUMMARY OF PROJECT SHARED PARKING ANALYSIS
The proposed project includes the demolition of the existing, vacant hospital and the construction of 250 dwelling units of senior housing (including one manager’s unit) and 7,500 square feet (sf) of medical office use. The project would provide a total of 312 parking spaces on site, which includes 251 parking spaces reserved for the senior residents (including the manager’s unit), 23 spaces dedicated to residential guests, and 38 parking spaces for the medical office building. A total of 61 parking spaces would be shared between the guests of the residents (including the manager’s unit) and the medical office building.

The project meets the City Municipal Code Section 17.28.280 for the required number of parking spaces for the residents of the senior housing component. The project also meets the City Municipal Code Section 17.64.050 for the required number of parking spaces for the medical office component. The parking analysis evaluated the ability to share parking spaces between the guests of the senior residential component and the medical office component. The two components do not “peak” during the same time of day and therefore have the ability to share parking between the two uses.

ATTACHMENT 10
319
9/21/22 (\\lsaazfiles.file.core.windows.net\projects\MEA2201\Doc\Parking\Supplemental Parking Memo.docx)   2 The results of the parking analysis identified that the peak weekday utilization of the combined senior resident guest and medical office uses occurs at 7:00 p.m. when 61 spaces are occupied.

Based on the proposed parking supply of 61 shared stalls, the parking supply would accommodate the peak parking demand. As a result, adequate parking supply would be provided during the weekday.

The analysis also described that the peak weekend utilization of the combined senior resident guest and medical office uses occurs between 7:00 p.m. and 10:00 p.m., when 50 spaces are occupied.

Based on the proposed parking supply of 61 shared stalls, a residual of 11 stalls is expected. As a result, adequate parking supply would be provided during the weekend.

Therefore, the shared parking analysis demonstrates that the proposed parking supply of 312 spaces, including 61 spaces shared between guests of the senior residents and the medical office building, would adequately accommodate the expected parking demand during the weekday and weekend. Per City Municipal Code Section 17.64.120, the two components meet the findings necessary to share parking on‐site.

INSTITUTE OF TRANSPORTATION ENGINEERS PARKING GENERATION LSA reviewed the Institute of Transportation Engineers (ITE) Parking Generation Manual (5th Edition, 2019), which includes parking requirements for different land uses. The ITE Parking Generation Manual is accepted throughout the nation as an industry standard.

Based on the ITE Parking Generation Manual (Land Use 252 – Senior Adult Housing, Attached), the peak parking demand for senior housing occurs between the hours of 10:00 p.m. and 8:00 a.m. The average parking rate is 0.61 space per dwelling unit. This includes both residents and guests/visitors.

Based on the 250 senior units for the proposed project, this would require 153 parking spaces for the senior residents and their guests. ITE also identifies an 85th percentile parking rate of 0.67 spaces per dwelling unit. Using this more conservative rate, the proposed project would require 168 parking spaces.

The proposed project will provide 274 dedicated parking spaces for the senior residents and their guests. This presents 121 more spaces than the average ITE rate for Senior Adult Housing and 106 more spaces than the 85th percentile parking rate identified in ITE.

URBAN LAND INSTITUTE SHARED PARKING
LSA reviewed the Urban Land Institute (ULI) Shared Parking Manual (3rd Edition, 2020), which includes a case study on senior adult housing parking requirements. The ULI Shared Parking Manual is also accepted throughout the nation as an industry standard.

Based on the survey of eight active adult senior housing facilities (Kimley‐Horn, Figure 4‐26 in the ULI Shared Parking Manual), the average parking rate is 0.88 space per dwelling unit. This includes both residents and guests/visitors. Based on the 250 senior units for the proposed project, this would require 220 parking spaces for the senior residents and their guests. The case study also identifies an 85th percentile parking rate of 0.90 space per dwelling unit. Using this more conservative rate, the proposed project would require 225 parking spaces.

ATTACHMENT 10
320
9/21/22 (\\lsaazfiles.file.core.windows.net\projects\MEA2201\Doc\Parking\Supplemental Parking Memo.docx)   3 The ULI Shared Parking Manual states “considering the parking behaviors, ITE parking ratios, and observed parking ratios, the recommended ratios of parking spaces per unit is 0.85 spaces per unit for weekdays and 0.76 spaces per unit for weekends,” which results in 213 and 190 spaces for the proposed project, respectively.

The proposed project will provide 274 parking spaces for the senior residents and their guests. This presents 54 more spaces than the average ULI rate in the case study for senior housing and 49 more spaces than the 85th percentile parking rate from ULI. This also results in 61 more spaces than the recommended ULI parking rate for senior housing.

SHORECLIFFS SENIOR APARTMENTS
An application to the City was submitted and approved by the Planning Commission on March 6, 2019, for a 150‐unit senior housing development at the Shorecliffs Golf Course property. As included in the Planning Commission Staff Report, a parking analysis (attached) was provided to present actual parking demand at four comparable senior housing properties within Southern California.

The data presented shows an average parking requirement of 0.80 space per dwelling unit. Based on the 250 senior units for the proposed project, this would require 200 parking spaces for the senior residents and their guests. The proposed project will provide 274 parking spaces for the residential component. This represents 74 more spaces than the average parking rate of similar senior housing facilities nearby.

CONCLUSIONS
The shared parking analysis demonstrates that the proposed parking supply of 312 spaces, including 274 designated for senior residents and their guests, would adequately accommodate the expected parking demand during the weekday and weekend. The sources identified above based on actual observations, as summarized in Table A (attached), suggest that the peak parking demand for senior adult housing does not require one space per dwelling unit per the City’s Municipal Code requirement. As such, parking will be more than satisfied for the residents, guests, and medical office building on site.

Attachments: Table A – Senior Housing Parking Rate Summary Shorecliffs Senior Apartments Parking Justification
ATTACHMENT 10
321
Project Project
Source Parking Rate per Senior Unit Parking Required Parking Provided Parking Surplus/(Deficit)ITE Parking Generation Manual (5th Edition) ‐  Average Rate 0.61 153 274 121‐ 85th Percentile Rate 0.67 168 274 106ULI Shared Parking Manual (3rd Edition) ‐  Average Rate 0.88 220 274 54‐ 85th Percentile Rate 0.90 225 274 49‐ Recommended Rate 0.85 213 274 61Shorecliffs Golf Course Senior Housing Parking Study ‐  Average Rate 0.80 200 274 74
Table A: Senior Housing Parking Rate Summary
ATTACHMENT 10
322
ATTACHMENT 10
323
ATTACHMENT 10
324
Addendum to the City of San Clemente
Housing and Safety Elements Update Program
Environmental Impact Report for the
San Clemente Senior Housing & Medical
Office Project
San Clemente, California
Prepared for
City of San Clemente
910 Calle Negocio
San Clemente, CA 92673
Prepared by
RECON Environmental, Inc.
3111 Camino del Rio North, Suite 600
San Diego, CA 92108
P 619.308.9333
RECON Number 9335-6
September 29, 2022
ATTACHMENT 11
325
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project
i

TABLE OF CONTENTS

1. Project Title ....................................................................................................................................... 1

2. Lead Agency Name and Address ............................................................................................... 1

3. Contact Person and Phone Number .......................................................................................... 1

4. Project Location ............................................................................................................................... 1

5. Project Applicant/Sponsor’s Name and Address .................................................................. 2

6. General Plan Designation ............................................................................................................ 2

7. Zoning ............................................................................................................................................... 2

8. Statement of Environmental Findings ...................................................................................... 2

9. Previous Environmental Document ........................................................................................... 2

10. Summary of Original Project ....................................................................................................... 3

11. Project Site Existing Conditions and Surrounding Land Use(s) ......................................... 3

12. Project Description ........................................................................................................................ 4

13. Other Required Agency Approvals or Permits Required .................................................... 5

14. New Significant Environmental Effects or Substantially More Severe Environmental Effects Compared to Those Identified in the Previous CEQA Document .............................. 5

15. Determination ................................................................................................................................. 5

15.1 Aesthetics ............................................................................................................................. 10

15.2 Agriculture Resources ....................................................................................................... 13

15.3 Air Quality ............................................................................................................................ 13

15.4 Biological Resources ......................................................................................................... 19

15.5 Cultural Resources ............................................................................................................ 23

15.6 Energy ................................................................................................................................... 26

15.7 Geology and Soils .............................................................................................................. 31

15.8 Greenhouse Gas Emissions ............................................................................................ 35

15.9 Hazards and Hazardous Materials .............................................................................. 38

15.10 Hydrology and Water Quality ........................................................................................ 41

15.11 Land Use and Planning ................................................................................................... 45

15.12 Mineral Resources ............................................................................................................ 46 ATTACHMENT 31
326
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project
ii
TABLE OF CONTENTS (cont.)

15.13 Noise ..................................................................................................................................... 46

15.14 Population and Housing ................................................................................................. 56

15.15 Public Services and Recreation ..................................................................................... 57

15.16 Transportation ................................................................................................................... 60

15.17 Utilities and Service Systems ......................................................................................... 64

15.18 Wildfire ................................................................................................................................. 66

16.0 Mitigation Monitoring and Reporting Program Incorporated into the project .......... 68

17.0 Checklist References ..................................................................................................................... 71

FIGURES
1: Regional Location ............................................................................................................................................. 7 2: Project Location on Aerial Photograph ..................................................................................................... 8 3: Site Plan ................................................................................................................................................................ 9 4: Noise Measurement Locations .................................................................................................................. 48 TABLES
1: Project Construction Emissions in Pounds Per Day ............................................................................. 15 2: Project Operational Emissions in Pounds Per Day ............................................................................... 16 3: Project Localized Construction Emissions in Pounds Per Day.......................................................... 17 4: Project Localized Operational Emissions in Pounds Per Day ........................................................... 17 5: Off-site Construction Vehicle Fuel Consumption ................................................................................. 27 6: On-site Construction Equipment Fuel Consumption .......................................................................... 27 7: Vehicle Fuel/Electricity Consumption ...................................................................................................... 28 8: Operational Electricity and Natural Gas Use ......................................................................................... 30 9: Greenhouse Gas Emissions (metric tons per year) .............................................................................. 36 10: Storm Water Flow Rates in Cubic Yards Per Second .......................................................................... 44 11: Existing Noise Level Measurements—Long Term ............................................................................... 47 12: Potential Construction Noise Impacts by Phase .................................................................................. 49 13: Potential Construction Noise Impacts During Site Preparation and Grading ............................ 50 14: Summary of HVAC Noise Levels ............................................................................................................... 52 15: Potential Construction Vibration Annoyance Impacts at Nearest Receptor .............................. 55 16: Potential Construction Vibration Damage Impacts at Nearest Receptor .................................... 55 17: Project Trip Generation Comparison ....................................................................................................... 62 18: Mitigation, Monitoring, and Reporting Program Incorporated into the Project ...................... 69 ATTACHMENT 31
327
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project
iii
TABLE OF CONTENTS (cont.)

APPENDICES
A: Visual, Light, Glare, Shade, and Shadow Memorandum
B: Arborist Report
C: Air Quality and Greenhouse Gas Analysis
D: Biological Assessment
E: Cultural Resources Records Search Results
F: Energy Calculations
G: Geologic and Seismic Hazards Review
H: Phase I Environmental Site Assessment
I: Preliminary Water Quality Management Plan
J: Paleontological Analysis
K: Hydrology Analysis
L: Noise and Vibration Impact Analysis
M: Vehicle Miles Traveled Analysis
ATTACHMENT 31
328
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 1 ends

CITY OF SAN CLEMENTE

ADDENDUM TO ADOPTED PROGRAM ENVIRONMENTAL IMPACT REPORT This document is an Addendum to the San Clemente Housing and Safety Elements Update PEIR (State Clearinghouse No. 2021020256) that was adopted by the City Council on October 5, 2021, hereafter referred to as “2021 FEIR”). The Addendum analyzes the environmental effects of the proposed project in light of the Final PEIR, which analyzed potential environmental impacts associated with the development of a number of housing sites, including housing development at 654 Camino del los Mares. The Addendum has been prepared in accordance with relevant provisions of the California Environmental Quality Act (CEQA) of 1970 (as amended) and the State CEQA Guidelines.

According to Section 15164 of the State CEQA Guidelines, an addendum to a previously certified EIR or Negative Declaration is the appropriate environmental document in instances when “only minor technical changes or additions are necessary” and when the new information does not involve new significant environmental effects beyond those identified in the previous EIR. The analysis herein demonstrates that the proposed addendum involves only minor technical changes to the 2021 FEIR and would not result in any new or increased severity significant environmental effects beyond those identified in the 2021 FEIR. As such, an addendum is the appropriate environmental document under CEQA.

1. Project Title
San Clemente Senior Housing & Medical Office Project

2. Lead Agency Name and Address
City of San Clemente
910 Calle Negocio
San Clemente, CA 92673

3. Contact Person and Phone Number
Jennifer Savage
Assistant to the City Manager
City of San Clemente
(949) 361-6186
[email protected]

4. Project Location
654 Camino del los Mares, San Clemente, CA 92673
Assessor’s Parcel Number 675-072-19-00
ATTACHMENT 31
329
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 2 ends

5. Project Applicant/Sponsor’s Name and Address
Memorial Care Health System
17360 Brookhurst Street
Fountain Valley, CA 92708

6. General Plan Designation
Existing: Regional Medical Facilities (RMF)
Proposed: Community Commercial (CC4)

7. Zoning
Existing: Regional Medical Facilities (RMF1)
Proposed: Community Commercial (CC4)
All reports and documents referenced in this Addendum are on file with the City of San Clemente, Community Development Department, 910 Calle Negocio, San Clemente, California 92673.

Telephone Number: (949) 361-6100. A digital copy is available from the City website:
https://www.san-clemente.org/departments-services/environmental-documents-for-currentprojects.

8. Statement of Environmental Findings
An Addendum to the Program Environmental Impact Report (PEIR) for the Housing and Safety Elements Update was prepared by the City of San Clemente (City), Community Development Department to evaluate whether development of senior housing and medical office at 645 Camino de los Mares would result in any new significant impacts or increased severity of impacts beyond those identified in the 2021 FEIR for the Housing and Safety Elements Update. As Lead Agency under CEQA, and based on the findings contained in the attached Addendum, the City has determined that the project would not have any new or more severe impacts that were not previously identified in the PEIR for the Housing and Safety Elements Update. The City also finds that the Addendum reflects the City’s independent judgment.

The location and custodian of the documents and any other materials which constitute the record of proceedings upon which the City bases its determination to adopt this Addendum are as follows:

City of San Clemente, Community Development Department, 910 Calle Negocio, San Clemente, California, Custodian: Jennifer Savage, Assistant to the City Manager.

9. Previous Environmental Document
The 2021 FEIR determined that implementation of the Housing and Safety Elements Update would result in significant and unavoidable direct and/or cumulative impacts related to Air Quality (Direct and Cumulative), Greenhouse Gas (Direct and Cumulative), Land Use (Direct), Noise (Direct and Cumulative), and Transportation (Direct and Cumulative). The 2021 FEIR determined that implementation of the Housing and Safety Elements Update would result in impacts that would be mitigated to a level less than significant related to Biological Resources (Direct and Cumulative), ATTACHMENT 31
330
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 3 ends

Cultural and Tribal Resources (Direct and Cumulative), Geology and Soils (Direct and Cumulative), and Hazards and Hazardous Materials (Direct). All other impacts were determined to be less than significant or would have no impact.

10. Summary of Original Project
The original project consisted of updates to the City’s Housing and Safety Elements as described below.

Housing Element Update: The City prepared the 6th Cycle Housing Element Update (2021-2029) to identify the City’s housing needs and outline goals, policies, and programs to address them. The Housing Element evaluated ways to accommodate the Regional Housing Needs Assessment (RHNA) of 982 new housing units allocated to the City by the Southern California Association of Governments (SCAG). To this end, the City identified an inventory of available sites that could accommodate the City’s RHNA allocation through a combination of sources including accessory dwelling units (ADUs) and vacant and underutilized sites (Housing Sites). The project evaluated rezoning of specific sites to allow development ranging from residential medium (24 dwelling units per acre [du/ac]), residential medium high (30 du/ac), or residential high (40 du/ac). Although the 2021 FEIR evaluated rezoning of these sites, including the site at 654 Camino del los Mares, rezones were not adopted with certification of the FEIR. The City’s intent was to implement rezoning at a future date, such as when development is proposed. Relevant to this addendum, the FEIR evaluated development at 645 Camino de los Mares of up to 238 housing units and 7,500 square feet of commercial space. The site is referred to as Site V in the FEIR.

The Housing Element also included a program to allow by-right approval of housing projects that include 20 percent of the units as housing affordable to lower income households. The ministerial process is implemented through a Housing Overlay that provides objective development standards.

The City’s existing architectural and design review process is used for projects in the Affordable Housing Overlay Zone. Future development consistent with the Housing Element was anticipated to be processed either ministerially, using the City’s existing Affordable Housing Overlay Zone or a subsequently approved Housing Overlay Zone, or with a discretionary process.

Safety Element Update: The project also included an update to the Safety Element, including figure updates for the issues of geologic, seismic and soil hazards, flood hazards, potential tsunami inundation areas, fire hazard severity zones, critical facilities, and hazardous materials sites. Updates to the Safety Element did not affect the potential for development to occur or result in any physical change as it is a policy document.

11. Project Site Existing Conditions and Surrounding Land Use(s) The 6.63-acre project site is located at 654 Camino del los Mares in San Clemente, California and is a Housing Site identified in the City’s Housing Element Update sites inventory. The project site is located on the south side of Camino de los Mares, approximately 545 feet west of the intersection with Marbella. The project site is currently developed with a vacant hospital facility and supporting access drives and parking areas. The project site is located within an urban environment surrounded by a mixture of commercial and residential uses. Existing commercial uses are located along the project’s western boundary, and to the north across Camino de los Mares. The San Clemente Villas ATTACHMENT 31
331
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 4 ends

by the Sea assisted living facility is located adjacent to the project’s southeastern boundary, while Interstate 5 (I-5) is located south of the project site. Figure 1 presents the regional location and Figure 2 presents an aerial photograph of the project site and vicinity.

12. Project Description
The project would implement housing and medical office at 654 Camino del los Mares, a site evaluated for approval of rezoning and a general plan amendment under the 2021 Final EIR. The project would demolish the existing buildings on-site and construct a 250-dwelling unit senior housing complex consisting of two residential apartment buildings (Building 1, 99 units and Building 2, 151 units), and a 7,500-square-foot (sf), two-story medical office (Building 3). The senior housing complex would consist of 61 studio units (540 sf), 119 one-bedroom units (650–897 sf), and 70 two-bedroom units (985–1,120 sf), for a total of 192,568 net leasable square feet. The project proposes both indoor and outdoor amenities for the residents, including a common clubroom, fitness center, roof-top deck, resort style pool deck, landscaped courtyards, and central paseo walkway. Both the senior housing and medical office would have all-access drives with surface parking areas around the perimeters of the buildings.

Access to the project site would be provided via Camino del los Mares with two entries at the west and east ends of the project’s frontage. The west entry would serve as the main entry and drop-off site, while the east entry would be the main access point for the medical office building as well as a secondary access point for the senior apartments. In order to reinforce the right-in and right-out turning movements at the western driveway, the project would make median improvements within Camino de Los Mares, and introduce signage and a center island at the driveway entrance to direct traffic. These changes would improve safety for turns into or out of the western driveway. The site would have a total of 312 parking spaces, of which 249 would be for the senior apartments, two would be for the manager’s unit, 38 for the medical office, and the remaining 23 would be part of a shared parking agreement. Figure 3 presents the proposed site plan. Construction of the project is anticipated to begin in the fall of 2023 and would continue for 18 to 24 months.

The project would require the following discretionary actions:
• General Plan Amendment to change the land use designation from Regional Medical Facilities (RMF) to Community Commercial (CC4).
• Zoning Code Amendment to change the zoning designation from Regional Medical Facilities (RMF1) to Community Commercial (CC4).
• Vesting Tentative Parcel Map to subdivide the property into two parcels. • Conditional Use Permit for a proposed senior housing use under the Community Commercial (CC4) zone.
• Site Plan Permit for development of a new non-residential building and a tentative map. • Architectural Permit for development of a new non-residential building and a new residential development of five or more units.

Compared to the development assumptions for the site analyzed in the 2021 Final EIR, the project is consistent except 12 additional senior housing units are proposed. The 2021 Final EIR evaluated development of 238 units, while the project proposes 250 units. This addendum addresses the increase in units to ensure no new or more severe impacts would result. Additionally, it should be ATTACHMENT 31
332
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 5 ends

noted that the 2021 FEIR authorized up to a maximum of 1,564 residential units, but not all sites are likely to be developed, resulting in a conservative estimate of impacts. Additionally, the PEIR assumed the General Plan designation and zone at 654 Camino del los Mares would change from Regional Medical Facility to Community Commercial, or CC4 allowing up to 45 units per acre. The project is consistent with this zone and designation.

13. Other Required Agency Approvals or Permits Required General Construction Permit (San Diego Regional Water Quality Control Board)

14. New Significant Environmental Effects or Substantially More Severe Environmental Effects Compared to Those Identified in the Previous CEQA Document The subject areas checked below were determined to be new significant environmental effects or to be previously identified effects that have a substantial increase in severity either due to a change in project, change in circumstances or new information of substantial importance, as indicated by the checklist and discussion on the following pages.

Aesthetics Agriculture and Forestry
Resources
Air Quality
Biological Resources Cultural Resources Energy
Geology/Soils Greenhouse Gas Emissions Hazards & Hazardous Materials
Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services
Recreation Transportation Tribal Cultural
Resources
Utilities/Service Systems Wildfire Mandatory Findings of Significance

15. Determination
Based on all available information in light of the entire record, the analysis in this Addendum, and pursuant to Section 15164 of the State CEQA Guidelines, the City has determined the following:
• There are no substantial changes proposed in the project which will require major revisions of the previous environmental document due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
• Substantial changes have not occurred with respect to the circumstances under which the project is undertaken which will require major revisions of the previous environmental document due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or ATTACHMENT 31
333
ATTACHMENT 31
334
FIGURE 1
Regional Location
kj
Laguna Coast
Wilderness Par k
Aliso and Wood
Canyons Park
Limestone Canyon
Regional Park
Whiting Ranch Wilderness
Park
Ronald W Caspers
Wilderness Par k
Onei ll
Regional
Park
Prado Flood
Control
Basin
Lake Mathews
Santiago
Reservoir

CAMP PENDLETON

MARINE CO BASE
Cleveland
National
Forest
Cleveland
National
Forest
A r r o y o T r a b u c o
S a n J u a n C r e e k
S a n t a A n a
R i v e r
Coronita
Coto de
Caza
El
Cerrito
El
Sobrante
Home Gardens
Ladera
Ranch
Las Flores
North Tustin
Temescal
Valley
UV74
UV71
UV73
UV241
UV22
UV57
UV91
§¨¦405
§¨¦15
§¨¦5

O R A N G E

C O U N T Y

R I V E R S I D E

C O U N T Y

S A N D I E G O

C O U N T Y
da
Riverside
Corona
Lake
Elsinore
Norco
Brea
Irvine
La Habra
Stanton
Mission
Viejo
Rancho
Santa Margarita
San Clemente
Villa
Park
Aliso
Viejo
Hunti ngton Beach
Tustin
Dana
Point
Fountain
Valley
Laguna
Beach
Laguna
Hills
Laguna Woods
Lake
Forest
Anaheim
Costa Mesa
Fullerton
Garden Grove
Laguna
Niguel
Orange
Placenti a
San Juan
Capistrano
Santa Ana
Westminster
Yorba Linda Chino Hills
Eastvale
Newport Beach
kj
Laguna Coast
Wilderness Par k
Aliso and Wood
Canyons Park
Limestone Canyon
Regional Park
Whiting Ranch Wilderness
Park
Ronald W Caspers
Wilderness Par k
Onei ll
Regional
Park
Prado Flood
Control
Basin
Lake Mathews
Santiago
Reservoir

CAMP PENDLETON

MARINE CO BASE
Cleveland
National
Forest
Cleveland
National
Forest
A r r o y o T r a b u c o
S a n J u a n C r e e k
S a n t a A n a
R i v e r
Coronita
Coto de
Caza
El
Cerrito
El
Sobrante
Home Gardens
Ladera
Ranch
Las Flores
North Tustin
Temescal
Valley
UV74
UV71
UV73
UV241
UV22
UV57
UV91
§¨¦405
§¨¦15
§¨¦5

O R A N G E

C O U N T Y

R I V E R S I D E

C O U N T Y

S A N D I E G O

C O U N T Y
da
Riverside
Corona
Lake
Elsinore
Norco
Brea
Irvine
La Habra
Stanton
Mission
Viejo
Rancho
Santa Margarita
San Clemente
Villa
Park
Aliso
Viejo
Hunti ngton Beach
Tustin
Dana
Point
Fountain
Valley
Laguna
Beach
Laguna
Hills
Laguna Woods
Lake
Forest
Anaheim
Costa Mesa
Fullerton
Garden Grove
Laguna
Niguel
Orange
Placenti a
San Juan
Capistrano
Santa Ana
Westminster
Yorba Linda Chino Hills
Eastvale
Newport Beach
0 Miles 5 [
M:\JOBS5\9335.6\common_gis\MXD\fig1.mxd 08/10/2022 bma
LOS

ANGELES

ORANGE RIVERSIDE

SAN BERNARDINO

SAN DIEGO
MEXICO
kj Project Location
ATTACHMENT 31
335
FIGURE 2
Project Location on Aerial Photograph
CALLE
AGUA

PASEO HALCON

VIA PICHON

PASEO GANSO

VAI PASA
CLE

LA QUINTA

CALLE VICENTE

CLE LA VETA

VIAPAJARO
C
A
NTILE
NA
ALLEY
PASEO

FLAMENCO

CALLE LOS
OLIVOS

MARBELLA

CAMPANILLA

VIA LORO

VIA GOLETA

CRESTA DEL SOL
CALLE

CANASTA

CALLE CAMPANA

C A LLE
QUIETO

CAMINO ALONDRA
CLE

BORREGO

CALLE GRANDE VIS
TA

PASEO AGU LI A

CAMINO MIRA COSTA

VIA CANCHA
VIA
TUNAS

UNKNOWN
MARANA
ALLEY

CALLE ZORRA
TESORO
CLE
CASINO
CLE

LA QUINTA

CLE ARCO

VIA OLA

CLE DIVINO
S
CLE

GUAYMAS

CLE CASITA

CALLE CASIN O

UNKNOWN
AL LEY

UNKNOWN

MA DRIGAL

CAMINO DE LOS MARES

UNKNOWN

CAMINO EL MOLINO

MARDEL REY
CA
M
MIRA
CO
S
TA
PLAZA

ESTIVAL
PLAZA

ESTIVAL
PLAZA

ESTIVAL

ESTIVAL
PLAZA
§¨¦5
CALLE
AGUA

PASEO HALCON

VIA PICHON

PASEO GANSO

VAI PASA
CLE

LA QUINTA

CALLE VICENTE

CLE LA VETA

VIAPAJARO
C
A
NTILE
NA
ALLEY
PASEO

FLAMENCO

CALLE LOS
OLIVOS

MARBELLA

CAMPANILLA

VIA LORO

VIA GOLETA

CRESTA DEL SOL
CALLE

CANASTA

CALLE CAMPANA

C A LLE
QUIETO

CAMINO ALONDRA
CLE

BORREGO

CALLE GRANDE VIS
TA

PASEO AGU LI A

CAMINO MIRA COSTA

VIA CANCHA
VIA
TUNAS

UNKNOWN
MARANA
ALLEY

CALLE ZORRA
TESORO
CLE
CASINO
CLE

LA QUINTA

CLE ARCO

VIA OLA

CLE DIVINO
S
CLE

GUAYMAS

CLE CASITA

CALLE CASIN O

UNKNOWN
AL LEY

UNKNOWN

MA DRIGAL

CAMINO DE LOS MARES

UNKNOWN

CAMINO EL MOLINO

MARDEL REY
CA
M
MIRA
CO
S
TA
PLAZA

ESTIVAL
PLAZA

ESTIVAL
PLAZA

ESTIVAL

ESTIVAL
PLAZA
§¨¦5
Image Source: NearMap (flown June 2022)
0 Feet 500 [
Project Boundary
M:\JOBS5\9335.6\common_gis\MXD\fig2_EIR.mxd 08/10/2022 bma ATTACHMENT 31
336
FIGURE 3
Site Plan
Map Source: TCA Architects
M:\JOBS5\9335.6\env\graphics\Fig3_EIR_Addendum.afdesign 09/28/22 bma 0 Feet 100
ATTACHMENT 31
337
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 10 ends

15.1 Aesthetics
Scenic Vistas
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could have a substantial adverse effect on a scenic vista. The 2021 FEIR determined that adherence to regulatory requirements, including the San Clemente Municipal Code (SCMC), the design principles contained within the City’s Design Guidelines, and applicable General Plan policies focused on preservation of scenic vistas and views, would ensure that future development of Housing Sites would not have a substantial adverse effect on a scenic vista, and impacts would be less than significant.

Project
The Visual, Light, Glare, Shade, and Shadow Memorandum (Visual Memo) completed for the project evaluated potential impacts related to aesthetics (Appendix A). A scenic vista is made up of three components: public viewing location; viewing corridor; and viewing scene. Review of Figures 4.1-1 and 4.1-2a of the 2021 FEIR determined that the project site is not visible from a City-Designated View Corridor. Although views of the Pacific Ocean and canyons do exist over the project site, implementation of the project would not block these view corridors, primarily because of the extensive landform and elevation changes north of the project site. With the exception of two or three private homes that would have a portion of their views of the Pacific Ocean obscured by the four-story height of the project, land areas to the north would continue to have public and private views over the project site. It should be noted that private views are not protected views under CEQA.

Additionally, the project would not contrast with the viewing scene (the horizon, water body/ocean or other coastal visual resources). Therefore, the project would not have a new or more substantial adverse effect on a scenic vista than previously analyzed, and impacts would be less than significant.

No new impact would occur.

Scenic Resources
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could substantially damage any scenic resources. The 2021 FEIR determined that adherence to regulatory requirements, including the SCMC, the City’s provisions of the Master Landscape Plan for Scenic Corridors, and applicable General Plan policies, would ensure that future development of Housing Sites would not degrade scenic resources, and impacts would be less than significant.

Project
Views of a regionally significant viewing scene (the ocean, waterfront, and horizon line) exist from I-5, and would be considered as scenic vistas. I-5 has the potential for scenic designation from Caltrans if adopted by the City. Regardless of the status of designation, the project is located on the ATTACHMENT 31
338
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 11 ends

north side of I-5, making it impossible to block motorist views of the ocean, canyons or other unique landforms.

The project site, although part of the broader viewing scene, is not itself the focus of views. The project would not remove scenic resources such as natural landforms, rock outcrops, natural areas, or other elements that make up the visual character and community character of the surrounding area. As described in Section 15.5 below, there are no designated historic buildings or designated historic resources located within or near the project site. Furthermore, the vacant hospital facility and supporting structures on-site that would be demolished do not qualify as historic resources. An Arborist Report was prepared for the project consistent with the requirements of the City’s Trees Ordinances (Ord. 17.64.060 and 17.84.020(B)) (Appendix B). The Arborist Report documented that the project site currently possesses 175 ornamental landscape trees, 77 of which are in good condition, 69 are in fair condition, and 29 are in poor condition. All the tree species found on-site are common non-native ornamental landscape trees that are readily available at commercial nurseries. Most of the trees are growing in less-than-optimal conditions, and none would be required to be preserved on site. Furthermore, the project would be consistent with all City regulations, including installation of new landscaping with drought-tolerant plant material that would enhance the scenic quality of the project site. Therefore, the project would not result in new or more substantial damage to any scenic resources than previously analyzed, and impacts would be less than significant. No new impact would occur.

Visual Character and Quality
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could substantially degrade existing visual character or quality. The 2021 FEIR determined that adherence to applicable sections of the SCMC and the City’s Design Guidelines, as well as land use plans that provide supplemental development regulations for those areas within the City’s Focus Areas and/or Specific Plan Areas, would ensure that development of the Housing Sites would not substantially degrade the existing visual character or quality of public views of the site and its surroundings, and impacts would be less than significant.

Project
Visual quality is associated with the delicate balance of uniqueness and uniformity, as well as the organization of the visual environment into either a chaotic, bland, unique or highly intact compositional arrangement of natural and man-made features. If a project introduces chaotic elements or removes elements that contribute to the intactness of an area, then a potential visual quality impact can occur. The project’s architecture would be a positive form and have aesthetically balanced detailing and materials. The project is designed to relate to the forms, materials, and colors of structures in the immediately surrounding area in terms of color, material, style, and scale. Project architecture and its forms would be aesthetically organized and simple, and are intended to enhance the City’s character of “Spanish Village by The Sea.”
The City is characterized by tall hills to the east with some ridgeline development, large slopes made up of mostly housing, bluffs and mesa tops on each side of the freeway, and ocean views to the ATTACHMENT 31
339
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 12 ends

west. Land uses change from housing developments, to commercial complexes and strip commercial development with some business parks and employment centers are common to the eastern hills of the City. The materials, scale, architectural detailing, and color of the project’s buildings would be consistent with the existing elements of the adjacent buildings, and would be consistent with much of the style and architectural treatments found throughout the viewshed. The project would have an overall low contrast with the existing setting. The overall architectural character of the immediate commercial and institutional community is that of Spanish revival, Spanish colonial, or mission style architecture. The common building materials of the adjacent community include mostly stucco with a high percentage of buildings using red clay tile roofing and heavy beam rafters.

The visual character of the existing and undeveloped portions of the project site are not considered to have a high or moderately high visual quality, are not part of a larger viewing scene or area that has high or moderate visual quality or community character associated with it. The project would not contrast with or dominate the visual character or visual quality of the adjacent areas, nor would the project change the visual character of the surrounding areas. Therefore, the project would not result in new or more substantial impacts relating to the existing visual character or quality of the site and its surroundings, and impacts would be less than significant. No new impact would occur.

Light and Glare
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could generate a substantial source of light or glare that would adversely affect day or nighttime views. The 2021 FEIR determined that development of the Housing Sites would be required to comply with SCMC standards related to light and glare (Chapter 17.24.130) and General Plan Policies NR-7.1, NR-7.2, and NR-7.3, which serve to minimize light pollution and trespass in order to preserve dark skies, and impacts would be less than significant.

Project
Glare can occur during both daytime and nighttime hours. Daytime glare is caused by the reflection of sunlight or artificial light from highly polished surfaces, such as window glass or reflective materials, and to a lesser degree, from broad expanses of light-colored surfaces. Daytime glare generation is common in urban areas and is typically associated with mid- to high-rise buildings with exterior façades largely or entirely comprised of highly reflective glass or mirror-like materials from which the sun can reflect, particularly following sunrise and prior to sunset. Daytime glare generation is typically related to sun angles, although glare resulting from reflected sunlight can occur regularly at certain times of the year. Glare can also be produced during evening and nighttime hours by artificial light directed or reflected toward a light-sensitive land use.

The City’s standard of permitting indicates that all proposed glazing (e.g., glass exterior surfaces or windows) would be required to meet current building code requirements to minimize reflectivity in order to avoid creating glare in off-site locations. Additionally, building facade features would be required, such as window shades, stepped building setbacks, angled building sides, and other architectural features that would reduce direct sunlight onto the building surface and minimize glare.

The project proposes to install solar panels on the carports, which can be a source of glare. However, ATTACHMENT 31
340
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 13 ends

most solar panels are designed with anti-reflective glass front surface and only reflects about two percent of incoming light. Reflective Coating (AR Coating) is a technical means to reduce reflection that also increases light absorption of solar cells and thus increase its performance. The project would be required to utilize panels that follow these standards, and therefore would not create an impact to adjacent parcels or motorists. The project would not include any other reflective materials that could generate glare, such as polished surfaces, mirror like window films, or highly reflective gloss painting.

Outdoor lighting would be subject to the requirements of City’s Lighting Ordinance (Section 17.24.130, which states the following:

Exterior lighting shall be energy-efficient and shielded or recessed so that direct glare and reflections are contained within the boundaries of the parcel, and shall be directed downward and away from adjoining properties and public rights-of-way. No lighting shall blink, flash, or be of unusually high intensity or brightness. All lighting fixtures shall be appropriate in scale, intensity and height to the use. Security lighting shall be provided at all entrances/exits.

The project has developed a lighting plan that would ensure consistency with the City’s Lighting Ordinance described above, which would prevent light from spilling over onto adjacent properties.

Additionally, the Visual Memo determined that project lighting would not affect nighttime views from surrounding properties. Therefore, the project would not create a new or more substantial source of light or glare that would adversely affect day or nighttime views in the area than previously analyzed, and impacts would be less than significant. No new impact would occur.

15.2 Agriculture Resources
2021 FEIR
Section 8.1 of the 2021 FEIR determined that the City does not possess any active farmland cultivation, zoning for agricultural use, or Williamson Act Contract. Additionally, no forest lands are present.

Therefore, the 2021 FEIR found that the Housing and Safety Elements Update would not result in any impacts to agricultural or forestry resources.

Project
There is no change to the analysis provided in the 2021 FEIR. No agricultural resources are present and therefore, no new or more severe impacts would occur.

15.3 Air Quality
Consistency with Air Quality Plans
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could increase regional emissions. The 2021 FEIR determined that development of the Housing Sites would be inconsistent with the South Coast Air Quality ATTACHMENT 31
341
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 14 ends

Management District (SCAQMD) 2016 Air Quality Management Plan (2016 AQMP), because buildout under the plan would exceed the population estimates assumed for the 2016 AQMP and would cumulatively contribute to the nonattainment designations of the South Coast Air Basin (Basin). No mitigation measures were available that would reduce impacts associated with the inconsistency with the 2016 AQMP, and impacts were determined to remain significant and unavoidable. Overriding considerations were prepared to support approval of the Housing Element Update notwithstanding the remaining significant impacts.

Project
The project is located within the Basin, which is under the jurisdiction of the SCAQMD. The Air Quality and Greenhouse Gas Analysis prepared for the project evaluated the project’s consistency with the 2016 AQMP (Appendix C). Consistent with the 2021 FEIR, the project would require a General Plan amendment to change the land use designation from Regional Medical Facilities (RMF) to Community Commercial (CC4) to allow for development of the senior housing complex and medical office. Therefore, growth forecasting in the 2016 AQMP for the project site was based on the existing Regional Medical Facilities (RMF) land use designation, which has a higher trip generation rate than senior housing and medical office. Based on the former hospital use, the project site was estimated to generate approximately 1,405 average daily trips (ADT). The current project would generate 1,080 ADT, which would be 325 ADT fewer than the former hospital use. Consequently, the proposed senior housing complex and medical office would generate fewer vehicle trips compared to the hospital use used for growth forecasting in the 2016 AQMP, and thereby generate fewer emissions compared to what was assumed in the 2016 AQMP. Therefore, the project would result in fewer trips than what was considered in the 2016 AQMP and would not obstruct or conflict with implementation of the Regional Air Quality Strategy (RAQS). Although the FEIR determined conflicts with the RAQS to be significant, development at this particular site would be consistent with the RAQS for the reasons discussed above. Therefore, the project would not result in any new or more severe impacts compared to the 2021 FEIR analysis.

Cumulative Net Increases of Criteria Pollutants
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could violate air quality standards. The 2021 FEIR determined that development of the Housing Sites could generate short-term emissions that would exceed the SCAQMD’s significance thresholds that could cumulatively contribute to the nonattainment designations of the Basin. Although implementation of 2021 FEIR mitigation measure AQ-1 would reduce criteria air pollutant emissions from construction-related activities to the extent feasible, the 2021 FEIR determined that impacts would remain significant and unavoidable.

Project
SCAQMD has established daily emissions thresholds for construction and operation of a project in the Basin. The emissions thresholds were established based on the attainment status of the Basin with regard to air quality standards for specific criteria pollutants. Because the concentration standards were set at a level that protects public health with an adequate margin of safety, these ATTACHMENT 31
342
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 15 ends

emissions thresholds are regarded as conservative and would overstate an individual project’s contribution to health risks.

Construction and operation air emissions were calculated using California Emissions Estimator Model (CalEEMod). Table 1 presents the total projected construction maximum daily emission levels for each criteria pollutant and compares emissions to the SCAQMD regional significance thresholds.

As shown in Table 1, maximum daily construction emissions for each separate phase of construction of the project would not exceed the daily SCAQMD regional thresholds for all criteria pollutants. In addition to the construction period thresholds of significance, the project is required to comply with regional rules that assist in reducing short-term air pollutant emissions. SCAQMD Rule 403 requires that fugitive dust be controlled with best-available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. In addition, SCAQMD Rule 403 requires implementation of dust suppression techniques to prevent fugitive dust from creating a nuisance off-site.

Table 1
Project Construction Emissions in Pounds Per Day
Project Construction
Maximum Pollutant Emissions (lbs/day)
VOC NOx CO SOx PM10 PM2.5
Demolition 0.7 15.2 17.7 <0.1 2.4 0.9
Site Preparation and Grading 0.9 22.7 23.2 0.1 7.8 4.1
Building Construction 1.1 10.2 18.2 0.1 3.4 1.3
Architectural Coating 9.5 1.4 3.2 <0.1 0.6 0.2
Paving 1.3 11.3 17.7 <0.1 0.8 0.7
Maximum (lbs/day) 11.9 22.7 39.1 0.1 7.8 4.4
SCAQMD Thresholds 75.0 100.0 550.0 150 150.0 55.0
Exceeds Thresholds? No No No No No No
SOURCE: Appendix C.

NOTE: Maximum emissions of volatile organic compounds and carbon monoxide occurred during the overlapping building construction, architectural coating, and paving phases.

CO = carbon monoxide
lbs/day = pounds per day
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SCAQMD = South Coast Air Quality Management District
SOX = sulfur oxides
VOC = Volatile organic compounds
Table 2 presents the total projected operational emissions generated by the project. As shown in Table 2, operational emissions would not exceed any of the SCAQMD’s regional thresholds for criteria pollutants.

ATTACHMENT 31
343
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 16 ends

Table 2
Project Operational Emissions in Pounds Per Day
Source
Pollutant Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Area Sources 6.7 4.0 22.2 <0.1 0.4 0.4
Energy Sources 0.1 0.7 0.3 <0.1 0.1 0.1
Mobile Sources 2.8 2.9 27.2 0.1 7.4 2.0
Total Project Emissions 9.5 7.6 49.7 0.1 7.9 2.6
SCAQMD Thresholds 55.0 55.0 550.0 150.0 150.0 55.0
Exceeds Thresholds? No No No No No No
SOURCE: Appendix C.

NOTE: Values may not add correctly due to rounding.

CO = carbon monoxide
lbs/day = pounds per day
NOx = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SCAQMD = South Coast Air Quality Management District
SOX = sulfur oxides
VOC = Volatile organic compounds
The SCAQMD published its Final Localized Significance Threshold Methodology in July 2008, recommending that all air quality analyses include an assessment of air quality impacts to nearby sensitive receptors.1 This guidance was used to analyze potential localized air quality impacts associated with construction of the project. Localized significance thresholds (LST) are developed based on the size or total area of the emission source, the ambient air quality in the source receptor area, and the distance to the project. Sensitive receptors include residences, schools, hospitals, and similar uses that are sensitive to adverse air quality.

LSTs are based on the ambient concentrations of that pollutant within the project Source Receptor Area (SRA) and the distance to the nearest sensitive receptor. For the project, the appropriate SRA for the LST is the nearby Capistrano Valley area (SRA 21). SCAQMD provides LST screening tables for 25, 50, 100, 200, and 500-meter source-receptor distances. As identified above, the closest sensitive receptors to the project site are the San Clemente Villas by the Sea, which are adjacent to the project site. In cases where receptors may be closer than 82 feet (25 meters), any distances within the 82- foot (25-meter) buffer zone can be used. As such, the minimum distance of 82 feet was used. Based on the anticipated construction equipment, it is assumed that the maximum daily disturbed acreage for the project would be 2.5 acres.2
Project construction and operation emissions were compared to the LST screening tables in SRA 21, based on a 25-meter source-receptor distance and a disturbed acreage of 2.5-acres. Table 3 compares construction emissions to the recommended LST thresholds. As shown in Table 3, construction emissions would not exceed any of the SCAQMD LST thresholds. Table 4 compares 1South Coast Air Quality Management District. 2008b. Final Localized Significance Threshold Methodology. July. 2South Coast Air Quality Management District. n.d. Fact Sheet for Applying CalEEMod to Localized Significance Thresholds. Website: http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/caleemod-guidance.pdf (accessed July 2022).

ATTACHMENT 31
344
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 17 ends

operational emissions to the LST thresholds. As shown in Table 4, operational emissions would not exceed any of the SCAQMD LST thresholds.

Table 3
Project Localized Construction Emissions in Pounds Per Day Source NOx CO PM10 PM2.5
On-Site Project Emissions 17.1 21.2 6.9 3.8
Localized Significance Threshold 142.0 1,128.0 7.0 4.7
Exceeds Threshold? No No No No
SOURCE: Appendix C.

NOTE: Source Receptor Area 21, based on a 2.5-acre construction disturbance daily area, at a distance of 25 meters from the project boundary.

CO= carbon monoxide PM2.5= particulate matter less than 2.5 microns in size NOx= nitrogen oxides PM10= particulate matter less than 10 microns in size Table 4
Project Localized Operational Emissions in Pounds Per Day Source NOx CO PM10 PM2.5
On-Site Project Emissions 4.1 23.6 <1.0 <1.0
Localized Significance Threshold 142.0 1,128.0 2.2 1.2
Exceeds Threshold? No No No No
SOURCE: Appendix C.

NOTE: Source Receptor Area 21, based on a 2.5-acre construction disturbance daily area, at a distance of 25 meters from the project boundary.

CO= carbon monoxide PM2.5= particulate matter less than 2.5 microns in size NOx= nitrogen oxides PM10= particulate matter less than 10 microns in size Construction and operation of the project would not exceed SCAQMD thresholds related to construction or operational emissions. As shown in Tables 3 and 4, project specific construction and operational emissions would not exceed the LSTs. Therefore, the project would not result in a new or substantially greater cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment, and impacts would be less than significant. No new impact would occur.

Sensitive Receptors
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could generate substantial pollutant concentrations. The 2021 FEIR determined that development of the Housing Sites would not result in a carbon monoxide (CO) hot spot or expose sensitive receptors to TACs from construction activities, stationary sources, or mobile sources, and impacts would be less than significant.

ATTACHMENT 31
345
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 18 ends

Project
The Air Quality and Greenhouse Gas Analysis prepared for the project evaluated the project’s potential to generate CO hotspots or generate health risks on nearby sensitive receptors (see Appendix C).

CO Hot Spot Analysis
Vehicular trips associated with the project would contribute to congestion at intersections and along roadway segments in the project vicinity. The primary mobile-source pollutant of local concern is CO, a direct function of vehicle idling time, and therefore of traffic flow conditions. CO transport is extremely limited; under normal meteorological conditions, CO disperses rapidly with distance from the source. However, under certain extreme meteorological conditions, CO concentrations near a congested roadway or intersection may reach unhealthful levels, affecting local sensitive receptors (e.g., residents, schoolchildren, the elderly, and hospital patients). Typically, high CO concentrations are associated with roadways or intersections operating at unacceptable levels of service or with extremely high traffic volumes. In areas with high ambient background CO concentrations, modeling is recommended to determine a project’s effect on local CO levels.

An assessment of project-related impacts on localized ambient air quality requires that future ambient air quality levels be projected. Existing CO concentrations in the immediate project vicinity are not available. Ambient CO levels monitored at the Mission Viejo station (the closest stations to the project site) showed a highest recorded 1-hour concentration of 1.7 peak particulate matter (ppm; the State standard is 20 ppm) and a highest 8-hour concentration of 0.9 ppm (the State standard is 9 ppm) during the past 3 years. The highest CO concentrations would normally occur during peak traffic hours; hence, CO impacts calculated under peak traffic conditions represent a worst-case analysis.

The Air Quality and Greenhouse Gas Analysis documented that the project would generate 73 AM peak-hour trips and 92 PM peak-hour trips. The level of service evaluation completed in the Transportation Impact Analysis determined that the addition of the project traffic would not create any significant adverse impacts to nearby intersections (LSA 2022). Given the extremely low level of CO concentrations in the project area, and that the project would not result in any impacts related to LOS, project-related vehicles are not expected to contribute significantly to result in the CO concentrations exceeding the State or federal CO standards. The project would not result in a new or substantially greater CO concentration levels than previously analyzed, and impacts would be less than significant. No new or more severe impacts would occur compared to the 2021 FEIR.

Health Risk on Nearby Sensitive Receptors
Sensitive receptors are defined as people that have an increased sensitivity to air pollution or environmental contaminants. Sensitive receptor locations include schools, parks and playgrounds, day care centers, nursing homes, hospitals, and residential dwelling units. Land uses adjacent to the project site include residential and commercial uses. The nearby sensitive receptors to the project area include the residential area of San Clemente Villas by the Sea, which are located adjacent to the southeastern project boundary.

ATTACHMENT 31
346
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 19 ends

Construction of the project may expose surrounding sensitive receptors to airborne particulates and a small quantity of construction equipment pollutants (i.e., usually diesel-fueled vehicles and equipment). However, construction contractors would be required to implement measures to reduce or eliminate emissions by following SCAQMD rules for standard construction practices. As shown in Tables 1 through 4 above, the project would not exceed any of the local or regional emissions thresholds during construction or operation. Therefore, the project would not expose sensitive receptors to new or substantially greater pollutant concentrations than previously analyzed, and impacts would be less than significant. No new impact would occur.

Odors
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could generate odors. The 2021 FEIR determined that construction of the Housing Sites would generate emissions, such as diesel exhaust, and volatile organic compounds from architectural coatings and paving activities may generate odors; however, these odors would be temporary, intermittent, and not expected to affect a substantial number of people.

Additionally, noxious odors would be confined to the immediate vicinity of construction equipment.

By the time such emissions reach a receptor (e.g., people in residential units, day care centers, schools, nursing homes, etc.), they would be diluted to well below any level of air quality concern, and impacts would be less than significant. Once operational, the Housing Sites would not be a source of objectionable odors, and impacts would be less than significant.

Project
Odors associated with the project would be the same as that analyzed in the 2021 FEIR. During project construction, some odors may be present due to diesel exhaust. However, these odors would be temporary and limited to the construction period. Operation of the project would not include any activities or operations that would generate objectionable odors. Therefore, the project would not result in new or substantially greater impacts related to odors compared to the 2021 FEIR.

15.4 Biological Resources
Sensitive Species
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact any sensitive species. The 2021 FEIR determined that some of the Housing Sites would have the potential to impact sensitive species, which would be considered a significant impact. The 2021 FEIR found that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of 2021 FEIR Mitigation Framework BIO-1 for ministerial development, would reduce impacts to a level less than significant.

ATTACHMENT 31
347
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 20 ends

Project
Consistent with the City’s General Plan Mitigation Monitoring Program (Measure 3-1) which was incorporated by reference into the 2021 FEIR, a Biology Assessment was completed for the project that included a literature review to assist in determining the existence or potential occurrence of sensitive plant and animal species on the project site (Appendix D). Database records for the San Clemente, and Dana Point, California United States Geological Survey 7.5-minute quadrangles were reviewed on August 1, 2022, using the California Department of Fish and Wildlife’s California Natural Diversity Database and the California Native Plant Society Electronic Inventory. On May 9, 2022, LSA Biologists Leo Simone and Heather Monteleone conducted a general evaluation of the biological resources within and immediately adjacent to the project site to evaluate the existing conditions in the designated project area and to identify any existing or potential biological resource issues that would require additional study.

Vegetation within the immediate vicinity of project consists of non-native ornamental, all derived from commercial nursery stock. No native vegetation was observed on, or within, the immediate vicinity of the project site. The lack of native habitat is typical of urban land uses, and there is no high value habitat within or directly adjacent to the project site. The habitat of existing urban development is indicated by the low diversity of faunal species. The nearest native vegetation that would be considered high value habitat is more than three miles from the project site. Therefore, the project would not result in the loss of sensitive habitat or any special-status species. However, ornamental vegetation may provide nesting habitat for migratory birds protected under the federal Migratory Bird Treaty Act (MBTA). Consequently, vegetation removal during the avian nesting period, which typically extends between February and September would have the potential to impact nesting migratory birds protected under the MBTA, which would be considered a significant impact.

Implementation of mitigation measure MM-BIO-1 would reduce impacts related to nesting migratory birds to a level less than significant. Mitigation measure MM-BIO-1 is consistent with the requirements of Measure 3-1 listed in the City’s General Plan Mitigation Monitoring Program, which was incorporated by reference into the 2021 FEIR. Therefore, the project would not have a new or substantially greater adverse effect on any sensitive species than previously analyzed, and impacts would be less than significant. The 2021 FEIR Mitigation Framework BIO-1 would not apply to this project, as it is not being processed ministerially. No new impact would occur.

Mitigation Measures
MM-BIO-1: Nesting Migratory Birds
No direct impacts shall occur to any nesting birds, their eggs, chicks, or nests during the breeding season. If vegetation removal activities must occur during the bird breeding season of February 1 to September 15, then a pre-construction survey would be necessary to confirm the presence or absence of breeding birds within the temporary parking lot. If nests or breeding activities are located on-site, then an appropriate buffer area around the nesting site shall be maintained until the young have fledged. The width of the buffer would be determined by a qualified biologist and biological monitoring would be required during construction. If no nesting birds are detected during the pre­construction survey, no avoidance measures would be required.

ATTACHMENT 31
348
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 21 ends

Sensitive Vegetation Communities
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact riparian habitat or other sensitive natural communities. The 2021 FEIR determined that some sites proposed for development under the Housing Element Update would have the potential to impact riparian habitat or other sensitive natural communities, which would be considered a significant impact. The 2021 FEIR found that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of PEIR Mitigation Framework BIO-1 for ministerial development, would reduce impacts to a level less than significant.

Project
The project site is fully developed and does not possess any natural habitat, including riparian habitat.

Therefore, the project would not have a substantial adverse effect on any riparian habitat or other sensitive natural community than previously analyzed. Mitigation measure BIO-1 would not apply to this project as it is not being processed ministerially. No new impact would occur.

Wetlands
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact wetlands. The 2021 FEIR determined that some sites proposed for development under the Housing Element Update would have the potential to impact wetlands, which would be considered a significant impact. The 2021 FEIR found that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of 2021 FEIR Mitigation Framework BIO-2 for ministerial development, would reduce impacts to a level less than significant.

Project
The project site is fully developed and does not possess any federally protected wetlands, and no wetlands are located within proximity to the project site. Therefore, the project would not have a new or substantially greater adverse effect on state or federally protected wetlands than previously analyzed. Mitigation measure BIO-2 would not apply to this project as it is not being processed ministerially. No new impact would occur.

Wildlife Corridors
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact wildlife corridors or wildlife nursery sites. The 2021 FEIR determined that some sites proposed for development under the Housing Element Update would have the potential to impact wildlife corridors or wildlife nursery sites, which would be ATTACHMENT 31
349
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 22 ends

considered a significant impact. The 2021 FEIR found that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of 2021 FEIR Mitigation Framework BIO-1 for ministerial development, would reduce impacts to a level less than significant.

Project
As described above, no native vegetation was observed on, or within, the immediate vicinity of the project site. The lack of native habitat is typical of urban land uses, and there is no high value habitat within or directly adjacent to the project site. The Biological Assessment determined there is no evidence that wildlife movement occurs within the project site, and the faunal carrying capacity is expected to be very low due to the project location and proximity to surrounding commercial development. As described above, vegetation removal during the avian nesting period, which typically extends between February and September would have the potential to impact nesting migratory birds protected under the MBTA, which would be considered a significant impact.

Implementation of mitigation measure MM-BIO-1 described above would reduce impacts related to nesting migratory birds to a level less than significant. Mitigation measure MM-BIO-1 would be consistent with the requirements of Measure 3-1 listed in the City’s General Plan Mitigation Monitoring Program, which is consistent with the requirements of the 2021 FEIR. Therefore, the project would not have a new or substantially greater adverse effect on wildlife corridors than previously analyzed. The 2021 FEIR Mitigation Framework BIO-1 would not apply to this project as it is not being processed ministerially. No new impact would occur.

Habitat Conservation Planning
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could conflict with the provisions of an adopted Habitat Conservation Plan (HCP), Natural Community Conservation Plan. The City is one of the signatories of the Southern Orange County Subregional HCP, but is not a participant receiving regulatory coverage for impacts to covered species. The 2021 FEIR determined that none of the Housing Sites are located within the HCP Reserve area which represents the areas needed for conservation to achieve the goals of the HCP. Therefore, the 2021 FEIR found that development at the Housing Sites would not conflict with the Southern Orange County Subregional HCP, and impacts would be less than significant.

Project
The project site is not located within HCP Reserve area which represents the areas needed for conservation to achieve the goals of the HCP. Therefore, the project would not result in a new or substantially greater conflict with the Southern Orange County Subregional HCP than previously analyzed. No new impact would occur.

ATTACHMENT 31
350
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 23 ends

Policies and Ordinances Protecting Biological Resources 2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could conflict with any local policies or ordinances protecting biological resources. The 2021 FEIR determined that future discretionary development on Housing Sites would undergo an environmental review and would be subject to site specific mitigation measures to ensure impacts to biological resources are reduced to less than significant. Additionally, for future development that may proceed with a ministerial approval, implementation of 2021 FEIR Mitigation Framework BIO-1 and BIO-2 would ensure that the City applies applicable objective development standards to ensure consistency with City policies for the protection of biological resources. Therefore, the 2021 FEIR found that impacts related to policy and ordinance compliance To be
Project
The project would be required to be consistent with all relevant SCMC regulations and General Plan policies. An Arborist Report documented that the project site currently possesses 175 ornamental landscape trees, 77 of which are in good condition, 69 are in fair condition, and 29 are in poor condition. All the tree species found on-site are common non-native ornamental landscape trees that are readily available at commercial nurseries. Most of the trees are growing in less-than-optimal conditions, and none would be required to be preserved on-site. As described in above, impacts to all other biological resources would be less than significant or mitigated to a level less than significant. Therefore, the project would not conflict with any local policies or ordinances protecting biological resources, such as tree preservation policy or ordinance, to any greater degree than previously analyzed and impacts would be less than significant. The 2021 FEIR Mitigation Framework BIO-1 and BIO-2 would not apply to this project as it is not being processed ministerially. No new impact would occur.

15.5 Cultural Resources
Historic Resources
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact historic resources. The 2021 FEIR determined that adherence to applicable requirements of the City’s Design Guidelines, Henry Lenny Architectural Design Guidelines, Architectural Overlay District and the SCMC would ensure impacts related to historic resources for both ministerial and discretionary projects developed under the Housing Element Update would be less than significant.

Project
Consistent with the City’s General Plan Mitigation Monitoring Program (Measure 4-1) which was incorporated by reference into the 2021 FEIR, a Cultural Resources Records Search Results was completed for the project (Appendix E). This report included completion of a records search for the ATTACHMENT 31
351
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 24 ends

project at the South Central Coastal Information Center (SCCIC) that identified two thematic historic districts, the Spanish Colonial Revival Thematic Historic District and the Ole Hanson/Spanish Village by the Sea Thematic Historic District (see Appendix E). However, thematic historic districts consist of a group of resources linked together by a specific set of characteristics rather than cluster of resources located within a specific geographic region. Consequently, these thematic historic districts are noncontiguous and consist of various resources scattered throughout the City. There are no designated historic buildings associated with these thematic historic districts, or any other designated historic resources, located within or near the project site. Furthermore, the vacant hospital facility and supporting structures onsite that would be demolished do not qualify as historic resources.

Therefore, the project would not cause a new or substantially greater adverse change in the significance of an historical resource pursuant to §15064.5 than previously analyzed. No new impact would occur.

Archaeological Resources
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact archaeological resources. The 2021 FEIR determined that some sites proposed for development under the Housing Element Update would have the potential to encounter subsurface archaeological deposits, which could be considered a significant impact. The 2021 FEIR found that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of 2021 FEIR Mitigation Framework CUL-1 for ministerial development, would reduce impacts to a level less than significant.

Project
The Cultural Resources Records Search Results completed for the project at the SCCIC determined that 11 previous studies had been completed within one mile of the project site, two of which included portions of the project site. No previously identified archaeological resources were identified within the project site. However, the record search identified an expansive (15,600-square-meter) prehistoric artifact scatter was identified approximately 0.18-mile south of the project site. Furthermore, the prehistoric artifact scatter is located approximately 0.65 mile from the shoreline within the coastal corridor of a dense prehistoric habitation. Therefore, the presence of the prehistoric artifact scatter may be an indication that the project site may have moderate sensitivity for the presence of archaeological resources, which would be considered a significant impact. Implementation of the MM-CUL-1 would reduce impacts related to archaeological resources to a level less than significant.

Mitigation measure MM-CUL-1 is consistent with the requirements of Measure 4-1 listed in the City’s General Plan Mitigation Monitoring Program, which was incorporated by reference into the 2021 FEIR. Therefore, the project would not cause a new or substantially greater substantial adverse change in the significance of an archeological resource pursuant to §15064.5 than previously analyzed.

ATTACHMENT 31
352
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 25 ends

Mitigation Measures
MM-CUL-1: Archaeological Monitoring
A qualified archaeologist shall be retained for the project to conduct the following monitoring activities during construction:
a. An archaeologist shall be on call during grading and other significant ground-disturbing activities.
b. Should any cultural/scientific resources be discovered, no further grading shall occur in the area of the discovery until the Community Development Director concurs in writing that adequate provisions are in place to protect these resources. c. Unanticipated discoveries shall be evaluated for significance by an Orange County Certified Professional Archaeologist. If significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; submit materials to the California State University Fullerton or local archival facility, where available; and provide a comprehensive final report including appropriate records for the California Department of Parks and Recreation (Building, Structure, and Object Record; Archaeological Site Record; or District Record, as applicable).

Human Remains
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact human remains. The 2021 FEIR determined that in the unlikely event that human remains are discovered during future development at Housing Sites, adherence to California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98, the California Native American Graves Protection and Repatriation Act (2001), the federal Native American Graves Protection and Repatriation Act (1990), as well as AB 52 early consultation requirements, would ensure that impacts would be less than significant.

Project
In the event human remains are encountered, State Health and Safety Code Section 7050.5 requires that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98. The County Coroner must be notified of the find immediately. If the remains are determined to be Native American, the County Coroner will notify the Native American Heritage Commission (NAHC), which will determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 48 hours of notification by the NAHC. The MLD will have the opportunity to offer recommendations for the disposition of the remains. Adherence to these requirements is consistent with the 2021 FEIR analysis and would ensure no new or more substantial impacts on human remains would occur than previously analyzed in the 2021 FEIR.

ATTACHMENT 31
353
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 26 ends

Tribal Cultural Resources
2021 FEIR
As part of the 2021 FEIR, the City consulted with Native American Tribes. Although the City did not receive any requests for consultation or comments, the potential to uncover buried tribal cultural resources exists where development would disturb native soils. Therefore, the FEIR found that the potential for direct and/or indirect impacts to existing tribal cultural resources would be potentially significant.

Project
The City received one request for consultation on the subject Senior Housing and Medical Office project. The tribe has requested Native American monitoring during all ground disturbing activities.

However, implementation of MM-CUL-1 described above would ensure that a Native American monitor would be present during all ground disturbing activities. No changes to the project evaluated in the 2021 FEIR are proposed that would affect conclusions related to tribal cultural resources.

15.6 Energy
Wasteful, Inefficient, or Unnecessary Consumption of Energy 2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development that would consume energy. The 2021 FEIR determined that there are no conditions in the project areas of the Housing Sites that would require non-standard equipment or construction practices that would increase fuel-energy consumption above typical rates. Consistent with state requirements, all construction equipment would meet California Air Resources Board (CARB) Tier 3 In-Use Off-Road Diesel Engine Standards. Development of the Housing Sites would not result in any unusual characteristics that would result in excessive long-term operational building energy demand. Therefore, the 2021 FEIR found that the Housing and Safety Elements Update would not result in potentially significant environmental impacts due to wasteful, inefficient, or unnecessary consumption of energy resources, and impacts would be less than significant.

Project
Construction-Related Energy Use
During construction, energy use would occur in two general categories: fuel use from vehicles used by workers commuting to and from the construction site, and fuel use by vehicles and other equipment to conduct construction activities. The construction equipment and worker trips required for the project were determined as a part of the Air Quality and Greenhouse Gas (GHG) Analysis prepared for the project (see Appendix C). Heavy-duty construction equipment is usually diesel powered.

ATTACHMENT 31
354
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 27 ends

Project construction activities would temporarily contribute additional vehicle trips on the local circulation system, and would generate up to 233 daily worker trips during an approximately 20- month period. Demolition hauling would generate up to 285 vehicle trips, soil hauling would generate up to 1,347 vehicle trips, and deliveries of construction materials would periodically generate up to 48 additional vehicle trips. Fuel consumption associated with on-road worker trips and delivery trips were calculated using the total trips, trip lengths calculated in the Air Quality and GHG Analysis, and EMFAC2021 fuel consumption rates (Appendix F). Fuel consumption associated with on-site construction equipment was calculated using the equipment quantities and phase lengths calculated in the Air Quality and GHG Analysis and CARB OFF-ROAD model (see Appendix F). Off-site and on-site fuel consumption that would occur over the entire construction period is summarized in Tables 5 and 6, respectively.

Table 5
Off-site Construction Vehicle Fuel Consumption
Trip Type
Total Vehicle Miles
Traveled
Total Fuel Consumption (gallons)
Electricity
Consumption
Gasoline Diesel kWh
Workers 1,380,845 49,483 1,231 196,673
Hauling 32,640 -- 194,428 --
Deliveries 331 -- 1,973 --
Total 1,413,816 49,483 197,632 196,673
Table 6
On-site Construction Equipment Fuel Consumption
Phase
Phase
Length
(Days) Equipment Amount
Total Usage
Hours
Total Diesel Fuel
Consumption
(gallons)
Demolition 20
Concrete Industrial Saws 1 160 221
Excavator 1 160 501
Rubber Tired Dozers 2 320 1,641
Site Preparation
and Grading 35
Rubber Tired Dozers 2 560 2,871
Tractors/Loaders/Backhoes 2 560 1,048
Excavator 1 280 877
Grader 1 280 1,114
Building
Construction 360
Crane 1 2,520 8,680
Forklifts 3 8,640 8,076
Tractors/Loaders/Backhoes 3 7,560 14,147
Paving 10
Paver 2 160 446
Paving Equipment 2 160 389
Rollers 2 160 255
Architectural
Coatings 180 Air Compressor 1 1,080 1,103
Total 39,500
ATTACHMENT 31
355
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 28 ends

Consistent with federal requirements, all equipment was assumed to meet CARB Tier 3 In­Use Off­Road Diesel Engine Standards. There are no known conditions in the project area that would require nonstandard equipment or construction practices that would increase fuel-energy consumption above typical rates. Therefore, the project would not result in the use of excessive amounts of fuel or other forms of energy during construction greater than previously analyzed, and impacts would be less than significant during construction. No new impacts would occur.

Operation-Related Energy Use
During operation, energy use would be associated with transportation-related fuel use (gasoline, diesel fuel, and electric vehicles), and building-related energy use (electricity and natural gas).

Transportation-Related Energy Use
Buildout of the project and occupation by residents would result in transportation energy use. Trips by individuals traveling to and from the project site would result from use of passenger vehicles or public transit. Passenger vehicles would be mostly powered by gasoline, with some fueled by diesel or electricity. Public transit would be powered by diesel or natural gas, and could potentially be fueled by electricity. The project is anticipated to generate 1,080 daily trips. Vehicle emission factors and fleet mix were based on regional averages from the CARB Emission Factors 2021 model. Based on CalEEMod Air Quality and GHG Analysis, the project would generate 3,468,235 annual vehicle miles traveled (VMT) which equals approximately 9,502 daily VMT. Total gasoline and diesel fuel consumption was calculated using EMFAC2021 fuel consumption rates and fleet data for light duty autos, light duty trucks, light heavy duty trucks, and motorcycles. The results are summarized in Table 7.

Table 7
Vehicle Fuel/Electricity Consumption
Gasoline Diesel Electric Plug-In Hybrid Total
VMT 8,974 187 403 196 9,760
Fuel Consumed (gallons) 256,891 4,208 0 11,860 272,958
Electricity Consumer (kWh) 0 0 1,042 648 1,690
kWh = kilowatt hour.

The Orange County Transit Authority Bus Route 1 runs along Camino de los Mares immediately adjacent to the project site. This route operates between San Clemente and Long Beach and connects to the San Clemente Metrolink Station. The proximity of regional shopping and local bus routes would help reduce VMT generated by the project. In addition, project fuel consumption would decline over time beyond initial operational year of the project as a result of continued implementation of increased federal and state vehicle efficiency standards. There is no component of the project that would result in unusually high vehicle fuel use during operation. As such, operation of the project would not create a land use pattern that would result in new or substantially greater wasteful, inefficient, or unnecessary use of energy than previously analyzed, and impacts would be less than significant. No new impact would occur.

ATTACHMENT 31
356
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 29 ends

Non-Transportation-Related Energy Use
Non-transportation energy use would be associated with electricity and natural gas. The Renewables Portfolio Standard (RPS) promotes diversification of the state’s electricity supply and decreased reliance on fossil fuel energy sources. Renewable energy includes (but is not limited to) wind, solar, geothermal, small hydroelectric, biomass, anaerobic digestion, and landfill gas. Originally adopted in 2002 with a goal to achieve a 20 percent renewable energy mix by 2020 (referred to as the “Initial RPS”), the goal has been accelerated and increased by Executive Orders (EOs) S-14-08 and S-21-09 to a goal of 33 percent by 2020. In April 2011, SB 2 (1X) codified California’s 33 percent RPS goal. SB 350 (2015) increased California’s renewable energy mix goal to 50 percent by year 2030. SB 100 (2018) further increased the standard set by SB 350 establishing the RPS goal of 44 percent by the end of 2024, 52 percent by the end of 2027, and 60 percent by 2030. Once operational, the project would be served by San Diego Gas & Electric (SDG&E). As of 2020, SDG&E had a 39 percent procurement of renewable energy (CPUC 2021).

The California Code of Regulations, Title 24, is referred to as the California Building Code. It consists of a compilation of several distinct standards and codes related to building construction, including plumbing, electrical, interior acoustics, energy efficiency, handicap accessibility, and so on. Of particular relevance to GHG reductions are the California Building Code’s energy efficiency and green building standards as outlined below.

Title 24, Part 11 of the California Code of Regulations is CALGreen. Beginning in 2011, CALGreen instituted mandatory minimum environmental performance standards for all ground-up new construction of commercial and low-rise residential buildings, state-owned buildings, schools, and hospitals. It also includes voluntary tiers (I and II) with stricter environmental performance standards for these same categories of residential and non-residential buildings. Local jurisdictions must enforce the minimum mandatory requirements and may adopt CALGreen with amendments for stricter requirements.

The project would, at a minimum, be required to comply with the mandatory measures included in the current 2019 Energy Code (California Code of Regulations, Title 24, Part 6) and the 2019 CALGreen standards. The mandatory standards require:
• Solar on single- and multi-family residential buildings • Outdoor water use requirements as outlined in local water efficient landscaping ordinances or current Model Water Efficient Landscape Ordinance standards, whichever is more stringent;
• Requirements for water conserving plumbing fixtures and fittings; • 65 percent construction/demolition waste diverted from landfills; • Inspections of energy systems to ensure optimal working efficiency; • Low-pollutant emitting exterior and interior finish materials such as paints, carpets, vinyl flooring, and particle boards;
• Dedicated circuitry to facilitate installation of electric vehicle charging stations in newly constructed attached garages for single-family and duplex dwellings; and ATTACHMENT 31
357
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 30 ends

• Installation of electric vehicle charging stations for at least three percent of the parking spaces for all new multi-family developments with 17 or more units.

Similar to the compliance reporting procedure for demonstrating Energy Code compliance in new buildings and major renovations, compliance with the CALGreen operational water reduction requirements must be demonstrated through completion of water use reporting forms for new lowrise residential and non-residential buildings. The water use compliance form must demonstrate a 20 percent reduction in indoor water use by either showing a 20 percent reduction in the overall baseline water use as identified in CALGreen or a reduced per­plumbing-fixture water use rate.

Electricity and natural gas service to the project site is provided by SDG&E. Once operational, the proposed residential units would use electricity and natural gas to run various appliances and equipment, including space and water heaters, air conditioners, ventilation equipment, lights, and numerous other devices. Generally, electricity use is higher in the warmer months due to increased air conditioning needs, and natural gas use is highest when the weather is colder as a result of high heating demand. As a part of the Air Quality and GHG Analysis prepared for the project (see Appendix C), CalEEMod was used to estimate the total operational electricity and natural gas consumption associated with the project. Table 8 summarizes the anticipated operational energy and natural gas use.

Table 8
Operational Electricity and Natural Gas Use
Total Use
Electricity 1,103,313 kWh/Year
Natural Gas 2,855,275 kBTU/Year
kwH = kilowatt hour; kBTU = 1,000 British thermal units Buildout of the project would result in an increase of operational electricity and natural gas usage when compared to the existing condition. The project would be required to meet the mandatory energy requirements of 2019 CALGreen and the California Energy Code (Title 24, Part 6 of the California Code of Regulations) and would benefit from the efficiencies associated with these regulations as they relate to building heating, ventilating, and air conditioning mechanical systems, water-heating systems, and lighting. The project would include solar panels. Further, electricity would be provided to the project by SDG&E, which currently has an energy mix that includes 39 percent renewables and is on track to achieve 60 percent by 2030 as required by RPS. Therefore, there are no project features that would result in new or a substantially greater use of excessive amounts of energy compared to what was evaluated in the FEIR. The project would not create unnecessary energy waste, or conflict with any adopted plan for renewable energy efficiency. New or more severe energy impacts would not occur. No new impact would occur.

Conflict with State or Local Energy Plans
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development that would consume energy. Future development associated with implementation of residential development at the Housing Sites would be subject to compliance ATTACHMENT 31
358
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 31 ends

with the California Building Code (Title 24) which aims to reduce excessive and inefficient energy use.

By locating housing at existing retail sites and developing retail uses along with multi-family residential uses on the potential Housing Sites, non-commute vehicle trips would be reduced. Future discretionary development would be reviewed for conformance with Mobility and Complete Streets Element policies that are intended to reduce VMT throughout the City. Furthermore, future development would, at a minimum, be required to comply with the mandatory measures included in the current 2019 Energy Code (California Code of Regulations, Title 24, Part 6) and the 2019 CALGreen standards. Therefore, the 2021 FEIR found that the Housing and Safety Elements Update would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency, and impacts would be less than significant.

Project
The applicable State plans that address renewable energy and energy efficiency are CALGreen, the California Energy Code, and RPS. As discussed above, the project would be required to meet the mandatory energy requirements of 2019 CALGreen and the 2019 California Energy Code. Therefore, the project would not result in new or substantially greater impacts related to conflicts with energy plans compared to the FEIR. The project would comply with all aspects of CALGreen and the California Energy Code. No new or more severe impacts would result compared to the FEIR.

15.7 Geology and Soils
Seismic Hazards and Unstable Geology
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development that that could be affected by seismic ground shaking, ground rupture, unstable soils, liquefaction, landslide, or collapse. The 2021 FEIR determined that adherence to regulatory requirements including the California Building Code (CBC) and SCMC requirements for soils engineering/ engineering geology reports and erosion control plans would ensure that development of the Housing Sites would not cause substantial adverse effects associated with seismic hazards and unstable geology, and impacts would be less than significant.

Project
No project changes have been identified that would affect the conclusion of the FEIR related to seismic hazards and unstable geology. As described in the Geologic and Seismic Hazards Review completed for the project (Appendix G), the project would be designed in accordance with all applicable current codes and standards utilizing the appropriate seismic design parameters to reduce seismic risk as defined by California Geological Survey (CGS) Chapter 2 of Special Publication 117a (CGS 2008), and the 2019 edition of the CBC, or the most current edition of the code at the time of project construction. The project would be required to comply with the SCMC.

The Geologic and Seismic Hazards Review completed for the project determined that the project site is not located within a liquefaction hazard zone based on the Seismic Hazard Zone Map for the Orange Quadrangle, nor is the site underlain by shallow groundwater or near-surface deposits of ATTACHMENT 31
359
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 32 ends

non-cohesive soils prone to liquefaction. Therefore, the project would not cause new or substantially greater adverse effects involving liquefaction than previously analyzed.

The site is flat and mostly would not be susceptible to landslide except the southwestern portion of the project site may be susceptible to landslide. The project would implement the use of shear keys, flattening of the existing slope gradients, or assignments of structural setbacks behind top of slope areas in order to avoid landslides. Through these measures the project would ensure protection against landslides. The project would not cause new or substantially greater adverse effects involving strong seismic ground shaking, unstable geology, landslides, liquefaction or collapse than previously analyzed, and impacts would be less than significant. No new impact would occur.

Soil Erosion
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development that could cause soil erosion. The 2021 FEIR determined that adherence to regulatory requirements including preparation of a storm water pollution prevention plan (SWPPP) and SCMC Chapter 15.36 (Grading Ordinance) would ensure that both future ministerial and discretionary development within the Housing Sites would not result in substantial soil erosion or the loss of topsoil, and impacts would be less than significant.

Project
The Preliminary Water Quality Management Plan (Appendix H) completed for the project identifies potential best management practices (BMPs) to be included as design features to protect against soil erosion, such as temporary catchment basins and/or sandbagging which would control runoff and contain sediment transport within the project site during construction. Following completion of the project, the project site would be improved with structures, hardscape, landscaping and appropriate drainage infrastructure. Therefore, the project would not result in new or substantially greater soil erosion or loss of topsoil than previously analyzed, and impacts would be less than significant. No new impact would occur.

Expansive Soils
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development that would be susceptible to expansive soils. The 2021 FEIR determined that adherence to CBC requirements as adopted by the City (SCMC Section 15.36.180) would ensure that future ministerial and discretionary development would not create substantial direct or indirect risks associated with expansive soils, and impacts would be less than significant.

Project
The Geologic and Seismic Hazards Review completed for the project included expansion index testing of shallow soil samples that revealed a low to medium expansion potential. The report states that import material for replacement fill, if needed, should consist of soils with low expansion ATTACHMENT 31
360
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 33 ends

potential, and implementation of standard engineering and earthwork construction practices, such as proper foundation design and controlled moisture conditioning or mixing with non-expansive soils, would reduce the risks associated with expansive soils (see Appendix G). The project would not create new or substantially greater direct or indirect risks to life or property associated with expansive soil than previously analyzed, and impacts would be less than significant. No new impact would occur.

Septic Systems
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development that would require wastewater services. The 2021 FEIR determined that none of the Housing Sites would utilize septic tanks or alternative wastewater disposal systems, and no impact would occur.

Project
The project would connect to existing wastewater services lines that traverse the project site and would not require the use of septic tanks or alternative wastewater disposal systems. No new or substantially greater impact would occur.

Paleontological Resources and Unique Geology
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development that could impact paleontological resources or unique geology. The 2021 FEIR found that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of 2021 FEIR Mitigation Framework PAL-1 for ministerial development, would, reduce impacts related to paleontological resources to a level less than significant.

Project
Consistent with the City’s General Plan Mitigation Monitoring Program (Measure 4-2) which was incorporated by reference into the 2021 FEIR, a Paleontological Analysis was completed for the project (Appendix I). The project specific Paleontological Analysis determined that soils beneath the site consist of artificial fill and Capistrano Formation (see Appendix I). Artificial fill consists of sediments that have been removed from one location and transported to another location by human activity, rather than by natural means, and does not possess any paleontological sensitivity. The marine Capistrano Formation was deposited during the early Pliocene to late Miocene. Two facies that are distinguished by their depositional environments and corresponding compositions are located within the vicinity of the project. The turbidite facies formed in marine channel and sub-sea fan environments, and is composed of coarse-grained, poorly bedded, weakly cemented sandstone and conglomeratic sandstone. In contrast, the siltstone facies accumulated in deep shelf and slope environments and consists of white to pale gray, massive to poorly bedded, friable siltstone, mudstone, and diatomaceous shale. Only the siltstone facies are mapped within the project site. The ATTACHMENT 31
361
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 34 ends

Capistrano Formation has produced abundant and diverse scientifically significant fossils, many of which come from the siltstone facies. Therefore, the Capistrano Foundation is considered to have high paleontological sensitivity. Although the fossil locality search did not identify any fossil localities within the boundaries of the project site, the search noted records of several fossil localities nearby from the Capistrano Formation. Therefore, project excavation within the Capistrano Foundation would have the potential to impact paleontological resources, which would be considered a significant impact, consistent with the FEIR. Implementation of mitigation measures MM-PAL-1 through MM-PAL-3 would reduce impacts related to paleontological resources to a level less than significant. Mitigation measures MM-PAL-1 through MM-PAL-3 are consistent with the requirements of Measure 4-2 listed in the City’s General Plan Mitigation Monitoring Program, which was incorporated by reference into the 2021 FEIR. Therefore, the project would not cause a new or substantially greater adverse change in the significance of a unique paleontological resource or site or unique geologic feature than previously analyzed. No new or substantially more severe impact would occur.

Mitigation Measures
MM-PAL-1: Paleontological Resources Impact Mitigation Program A paleontologist who meets the qualifications established by the Society of Vertebrate Paleontology (SVP) shall be retained to develop a Paleontological Resources Impact Mitigation Program (PRIMP) for this project. The PRIMP shall be consistent with the standards of the SVP and include the methods that will be used to protect paleontological resources that may exist within the project site, as well as procedures for monitoring, fossil preparation and identification, curation into a repository, and preparation of a report at the conclusion of grading.

MM-PAL-2: Paleontological Monitoring
Excavation and grading activities in deposits with high paleontological sensitivity (i.e., the Capistrano Formation) shall be monitored by a qualified paleontological monitor following a PRIMP. No monitoring is required for excavations in deposits with no paleontological sensitivity (i.e., Artificial Fill). If paleontological resources are encountered during the course of ground disturbance, the paleontological monitor shall have the authority to temporarily redirect construction away from the area of the find. In the event that paleontological resources are encountered when a paleontological monitor is not present, work in the immediate area of the find shall be redirected, and the paleontologist or paleontological monitor shall be contacted to assess the find for scientific significance. If determined to be scientifically significant, the fossil shall be collected from the field.

MM-PAL-3: Paleontological Resources Report
Collected resources shall be prepared to the point of identification, identified to the lowest taxonomic level possible, cataloged, and curated into the permanent collections of a museum repository. At the conclusion of the monitoring program, a report of findings shall be prepared to document the results of the monitoring program.

ATTACHMENT 31
362
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 35 ends

15.8 Greenhouse Gas Emissions
GHG Emissions
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that does not have the potential to add growth or population to the City, and therefore would not generate GHG emissions.

The 2021 FEIR determined that adoption of the Housing Element sites inventory would result in an increase in GHG emissions that exceed the 2017 Scoping Plan efficiency metrics and would result in an increase in VMT, resulting in a significant impact. Although implementation of Mitigation Framework GHG-1 would support GHG reductions for future ministerial development, and despite the City’s continued implementation of the City’s Climate Action Plan (CAP) and Sustainability Action Plan (SAP), the 2021 FEIR found that impacts would remain significant and unavoidable.

Project
The Air Quality and Greenhouse Gas Analysis prepared for the project evaluated the potential for the project to emit GHG (see Appendix C). GHG emissions associated with the project would occur over the short-term from construction activities, consisting primarily of emissions from equipment exhaust. There would also be long-term GHG emissions associated with project-related vehicular trips. CalEEMod results were used to quantify GHG emissions generated by the project. To provide guidance to local lead agencies on determining significance for GHG emissions in their CEQA documents, SCAQMD has provided screening thresholds. Though the SCAQMD has not published a quantified threshold beyond 2020, the Air Quality and Greenhouse Gas Analysis utilized a threshold of 2,400 metric tons of carbon dioxide equivalent (CO2e) per year or 3.8 metric tons of CO2e per year per service population, which was calculated for the buildout year of 2025 based on the GHG reduction goals of Senate Bill (SB) 32 and Executive Order B-30-15.

Demolition and construction activities associated with the project would produce combustion emissions from various sources. During construction, GHGs would be emitted through the operation of construction equipment and from worker and builder supply vendor vehicles, each of which typically use fossil-based fuels to operate. The combustion of fossil-based fuels creates GHGs such as CO2, CH4, and N2O. Furthermore, CH4 is emitted during the fueling of heavy equipment. Exhaust emissions from on-site construction activities would vary daily as construction activity levels change.

Lead agencies are required to quantify and disclose GHG emissions that would occur during construction, and the SCAQMD requires the construction GHG emissions to be amortized over the life of the project, defined as 30 years, added to the operational emissions, and compared to the applicable interim GHG significance threshold tier. Using CalEEMod, it was estimated that the project would generate 950.8 metric tons of CO2e during construction of the project. When annualized over the 30-year life of the project, annual emissions would be 31.7 metric tons CO2e.

Long-term operational GHG emissions are typically associated with mobile, area, and stationary sources as well as indirect emissions from sources associated with energy consumption, waste sources, and water sources. Following guidance from the SCAQMD, GHG emissions were estimated using CalEEMod. Table 9 presents the calculated GHG emissions for the project. As shown in Table 9, ATTACHMENT 31
363
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 36 ends

the project would generate 1,876.1 metric tons of CO2e per year, which would be below the scaled numeric threshold of 2,400 metric tons of CO2e per year. Therefore, the project’s contribution of GHG emissions would be below the SCAQMD threshold. Therefore, the project would not generate new or substantially greater GHG emissions than previously analyzed in the 2021 FEIR.

Table 9
Greenhouse Gas Emissions (metric tons per year)
Emissions Source
Operational Emissions
CO2 CH4 N2O CO2e
Percentage
of Total
Area Sources 58.2 <0.1 <0.1 58.7 3
Energy Sources 422.6 <0.1 <0.1 424.5 23
Mobile Sources 1,083.6 <0.1 <0.1 1,098.6 60
Waste Sources 62.8 3.7 0.0 155.5 8
Water Sources 88.8 0.6 <0.1 107.1 6
Total Operational Emissions 1,844.4 100
Amortized Construction Emissions 31.7 -
Total Annual Emissions 1,876.1 -
SCAQMD Threshold 2,400 -
Exceeds Threshold? No -
SOURCE: Appendix C.

CH4 = methane N2O = nitrous oxide
CO2 = carbon dioxide SCAQMD = South Coast Air Quality Management District CO2e = carbon dioxide equivalent
Policies, Plans and Regulations to Reduce GHG Emissions 2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that does not have the potential to add growth or population to the City, and therefore would not generate GHG emissions.

The 2021 FEIR determined that development of the Housing Sites would increase GHG emissions and VMT in the City. Although implementation of mitigation measure GHG-1 would support GHG reductions for future ministerial development, and despite the City’s continued implementation of the CAP and SAP, the 2021 FEIR found that impacts would remain significant and unavoidable.

Project
The City adopted a CAP in January 2014. The project would be consistent with the alternative transportation goal of the CAP by expanding pedestrian networks. The project would implement internal walkways linking the residential units with the amenity areas and surface parking areas, as well as providing connection to the Camino de los Mares parkway for access to the nearby transportation (bus stops), commercial centers, and the medical office building. This expansion of network would encourage people, including residents of the project site, to walk instead of drive.

Further, the senior housing in proximity to the Medical Offices would support reductions in VMT and associated GHG emissions. Additionally, the project would be consistent with the CAP land use goal, ATTACHMENT 31
364
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 37 ends

increasing the planting of new trees by incorporating landscaped courtyards in the residential community.

The project would also be consistent with the CAP goal of increasing energy efficiency in new buildings by complying with the latest California Building Code (Title 24), including the latest CALGreen standards for energy efficiency. The project would replace older buildings that were built with less efficient standard codes, improving the overall efficiency of the project site. Construction of the project would include a diversion of construction waste from landfills to recycling consistent with current local and State standards and CAP goals to increase diversion and reduction of waste.

Therefore, the project would be consistent with applicable CAP goals.

The project was analyzed for consistency with the goals of Assembly Bill (AB) 32 and the AB 32 Scoping Plan, as well as Executive Order B-30-15, SB 32, and AB 197. The AB 32 Scoping Plan contains GHG reduction measures that work towards reducing GHG emissions, consistent with the targets set by AB 32, Executive Order B-30-15 and codified by SB 32 and AB 197. AB 32 aimed at reducing GHG emissions to 1990 levels by 2020 and required the CARB to prepare a Scoping Plan that outlines the main State strategies for meeting the 2020 deadline and to reduce GHGs that contribute to global climate change. Executive Order B-30-15 added the immediate target of reducing GHG emissions to 40 percent below 1990 levels by 2030. CARB released a second update to the Scoping Plan, the 2017 Scoping Plan,
3 to reflect the 2030 target set by Executive Order B-30-15 and codified by SB 32. The companion bill to SB 32, AB 197, provides additional direction to the CARB related to the adoption of strategies to reduce GHG emissions. Additional direction in AB 197 intended to provide easier public access to air emissions data that are collected by CARB was posted in December 2016.

Overall, the AB 32 Scoping Plan contains GHG reduction measures that work towards reducing GHG emissions, consistent with the targets set by AB 32, Executive Order B-30-15 and codified by SB 32 and AB 197. The measures applicable to the project include energy efficiency measures, water conservation and efficiency measures, and transportation and motor vehicle measures. The project would comply with applicable energy measures through compliance with CALGreen energy conservation and green building standards. Compliance with CALGreen would also include measures related to the reduction of wastewater and water use. The project would also be required to comply with the California Model Water Efficient Landscape Ordinance. Therefore, the project would not conflict with any of the water conservation and efficiency measures. While specific regional emission targets for transportation emissions would not directly apply to the project, vehicles traveling to the project site would comply with the Pavley II (LEV III) Advanced Clean Cars Program. Therefore, the project would be consistent with the City’s CAP goals and would not result in new or substantially greater conflicts with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs than previously analyzed in the 2021 FEIR. 3California Air Resources Board. 2017. California’s 2017 Climate Change Scoping Plan. November.

ATTACHMENT 31
365
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 38 ends

15.9 Hazards and Hazardous Materials
Transport, Use, or Disposal of Hazardous Materials/Accidental Release/Emissions Near a School 2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that may require the transport, use, disposal of hazardous materials, or accidental release of hazardous materials. The 2021 FEIR determined that both ministerial and discretionary development on Housing Sites would be subject to extensive regulatory requirements including SCMC Chapter 8.36 (Hazardous Materials), the California Accidental Release and Prevention program, and other federal and state regulations relating to hazardous materials management and the SCMC requirements for the preparation and filing of Material Safety Data Sheet consistent with state laws would reduce impacts to a level less than significant.

Project
Construction and operation of the project would be subject to the regulatory requirements described in the 2021 FEIR. The project residential and commercial uses are consistent with allowable uses envisioned in the zone as part of the 2021 FEIR. The nearest school is Palisades Elementary School located approximately 0.9-mile northwest of the project site, greater than one quarter of a mile.

Therefore, project would not create a significant hazard to the public or the environment through routine transport, use, or disposal of hazardous materials, including within one-quarter mile of a school. No new or more severe impacts related to hazardous materials emissions or accidental release would occur.

Hazardous Materials Sites
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that may be located on a hazardous materials site. The 2021 FEIR determined that future discretionary development at Housing Sites would be subject to an environmental review under CEQA that would ensure site-specific evaluation of individual sites to ensure no hazardous conditions are present or if present, measures are taken to minimize risk. The 2021 FEIR determined that implementation of Mitigation Framework HAZ-1 would reduce impacts for ministerial projects to a level less than significant.

Project
A Phase I Environmental Site Assessment (ESA) was prepared for the project that evaluated whether the site is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 (Appendix J). The Phase I ESA conducted a record search for the project site which identified the following listings on hazardous materials databases:
• The project site is listed as active in the California Facility Index (CA FID) underground storage tank (UST) database. The project site is listed in the Emissions Inventory Data (EMI) system as producing one carbon monoxide ton per year and two oxides of nitrogen tons per year.

ATTACHMENT 31
366
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 39 ends

• The project site is listed in the Hazardous Waste Tracking System (HWTS) database with the inactive dates of 1999, 2000, 2001, 2005, and 2020.
• The project site is listed in the California Hazardous Waste Manifest (HAZNET) database maintained by the Department of Toxic Substances Control (DTSC) as having disposed of hazardous materials.
• The project site is listed in the Resource Conservation and Recovery Act Small Quantity Generator (RCRA-SQG) database. No violations were found. • The project site is listed in the Facility Index System/Facility Registry System (FINDS) and Enforcement & Compliance History Information (ECHO) database as various healthcare facilities. The environmental interest type is listed as “other hazardous waste activities”. No releases of hazardous substances are associated with the above listings.

Based on the review of database listings described above, the Phase I ESA determined that the project site does not qualify as a Recognized Environmental Conditions (REC). However, the Phase I ESA determined that the project site is listed in the UST database as having two USTs, one 550-gallon diesel UST and one 1,000-gallon product (not specified) UST. Both USTs are listed as active. The project site is listed in the California Environmental Reporting System (CERS) as a leaking underground storage tank (LUST) cleanup site. According to the Environmental Data Resources (EDR) Report, the leak was found on August 12, 1991, during inventory control. The cause of the leak is listed as corrosion. Approximately 190 gallons of diesel was leaked into the soils in the vicinity of the UST. The EDR Report lists that the leak was stopped by removing the contents of the UST.

Furthermore, the Orange County Health Care Agency (OCHCA) provided documents summarizing the activities associated with the clean-up of a diesel release onsite. The site received case closure and a No Further Action (NFA) letter on March 11, 1992. Based on the issuance of a NFA letter by the OCHCA, the Phase I ESA determined that this onsite listing is considered a Historical Recognized Environmental Conditions (HREC), which is defined as “a previous release of hazardous substances or petroleum products affecting the subject property that has been addressed to the satisfaction of the applicable regulatory authority or authorities and meeting unrestricted use criteria established by the applicable regulatory authority or authorities without subjecting the subject property to any controls (for example, activity and use limitations or other property use limitation).” The Phase I ESA did not identify any surrounding properties listed as hazardous materials sites in any regulatory databases. Therefore, as the project site has been remediated and cleared by the OCHCA, the project is not located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. No new or substantially greater impacts associated with hazardous materials sites than previously analyzed in the 2021 FEIR would occur.

Airport Hazards
2021 FEIR
The 2021 FEIR determined that the City is not located within an Airport Land Use Compatibility Plan or within two miles of a public airport or public use airport. Therefore, the 2021 FEIR found that the Housing and Safety Elements Update would not result in an airport safety hazard or excessive noise for people residing or working in the project area.

ATTACHMENT 31
367
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 40 ends

Project
The project site is not located within an Airport Land Use Compatibility Plan or within two miles of a public airport or public use airport. Therefore, the project would not result in a new or substantially greater safety hazard or excessive noise for people residing or working in the project area than previously analyzed. No new ore more severe impact would occur compared to what was evaluated in the 2021 FEIR.

Emergency Response
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development, and the Housing Sites are located within existing developed areas and along major transportation corridors in the City that would allow for evacuation and response.

Development at the Housing Sites would not physically interfere with any emergency response or evacuation plans because they would not include any features that would prevent continued implementation of these plans, and impacts would be less than significant.

Project
The project site is located within an urban environment along a developed transportation corridor that would allow for emergency evacuation. The project would utilize the existing driveway connections to Camino de los Mares. In order to reinforce the right-in and right-out turning movements at the western driveway, the project would make median improvements within Camino de Los Mares, and introduce signage and a center island at the driveway entrance to direct traffic.

These changes would improve safety for turns into or out of the western driveway and support emergency evacuation and response. The project would not make any other changes to the existing circulation network. Therefore, the project would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan beyond that previously analyzed, and no new or more severe impacts would occur compared to what was evaluated in the 2021 FEIR.

Wildland Fires
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development, and implementation of Safety Element policies by the City focused on increasing wildfire safety through increased coordination with fire protection agencies, using the latest mapping to determine wildfire risks, and supporting efforts to evaluate wildfire evacuation and safety planning. The 2021 FEIR determined that development of the Housing Sites, especially within or adjacent to Very High Fire Hazard Severity Zone (VHFHSZ), could result in impacts related to wildfire. However, future ministerial and discretionary development at the Housing Sites would be required to adhere to all regulatory requirements in place to minimize wildfire hazards including applicable sections of the SCMC, fire and building codes, and requirements from the fire chief that would be identified during future building permit reviews. Additionally, implementation of General Plan Policies S-3.02 through S-3.06 in the City’s General Plan Safety Element would further protect ATTACHMENT 31
368
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 41 ends

land uses within the VHFHSZ and enhance wildfire safety. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not expose people or structures either directly or indirectly to a significant risk of loss, injury, or death involving wildland fires, and impacts would be less than significant.

Project
The project site is located in an urbanized area and is not within, or adjacent to, an area identified as a VHFHSZ. The project would not result in new or more severe impact related to exposure of people or structures to wildland fires.

15.10 Hydrology and Water Quality
Water Quality
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could impact water quality. The 2021 FEIR determined that development of the Housing Sites would be subject to federal, state, and local regulations aimed at controlling water quality impacts. Both discretionary and ministerial development would be required to adhere to regulatory requirements including MS4 requirements, SCMC Chapters 13.40 (Stormwater Runoff Control), and Chapter 15.36 (Grading Ordinance), which include requirements to ensure storm water runoff is captured and treated and erosion control measures are implemented.

Adherence to these requirements would ensure that impacts associated with water quality would be less than significant.

Project
The Preliminary Water Quality Management Plan (PWQMP) prepared for the project determined that site is currently serviced by three existing storm drain lines (Appendix K). Runoff from the western portion of the project site is conveyed along the existing western drive aisle southerly to an existing inlet located in the southwestern portion of the site. Runoff is ultimately discharged to the existing storm drain line servicing Ocean View Plaza and conveyed southerly under I-5 to an existing wetland and natural drainage area, and then southeasterly through an existing golf course, prior to discharging to Prima Deshecha Canada and the Pacific Ocean to the south.

Runoff from the central and eastern portions of the project site are serviced by two existing storm drain lines located in the southeastern and the eastern portions of the site. These two storm drains convey flows to an existing storm drain line located within the existing apartment complex located east of the project site. Runoff is then conveyed easterly and then southerly under I-5, prior to discharging to an existing natural drainage and wetland and then southeasterly through an existing golf course, prior to discharging to Prima Deshecha Cañada and the Pacific Ocean to the south. The project does not receive run-on from off-site areas.

In the post-project condition, runoff from the site would be conveyed similar to pre-project conditions, with hydromodification controls employed to retain the site’s pre-development runoff flow rates and volumes. To satisfy the project’s requirement for Low Impact Development (LID) BMPs, ATTACHMENT 31
369
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 42 ends

hydromodification, and treat storm water pollutants of concerns, the project has been divided into five Drainage Management Areas (DMAs) as follows:
• DMA 1 (1.674 acres): Consists of the western and northern segment of the project site. Runoff would be conveyed southwesterly to an infiltration well located at the western portion of the project site.
• DMA 2 (4.463 acres): Consists of the central and southern portion of the project site. Runoff would be conveyed southwesterly to an infiltration well for retention. • DMA 3 (0.019 acre): Consists of existing landscaping, sidewalk and portion of the project’s southern entrance that drain away from the project site to the existing gutter in Camino de los Mares. Runoff from this area is not hydrologically connected to the project’s onsite DMAs.

No improvements are proposed for this area. No treatment is proposed for this area. • DMA 4 (0.448 acres): Consists of existing slopes and temporary disturbed areas (designated as 4-1 and 4-2) at the project’s southwestern limits required for remedial grading that would be returned to natural state. No treatment is proposed. • DMA 5 (0.064 acre): Consists of parkway and median improvements to Camion de los Mares.

Runoff from this area would be discharged to Camino de los Mares and is not hydrologically connected to the project’s onsite DMAs. Improvements within DMA would consist of the following:
o DMA 5-1 (0.002 acres): Replace existing pavement with extended paved median. No BMPs are proposed.
o DMA 5-2 (0.035 acres): Replace existing paved median and turn lane with landscaped median. Area is considered self-retaining as would consist almost entirely of depressed landscaping areas.
o DMA 5-3 (0.027 acres): The project would add two feet of sidewalk width and extend sidewalk to reconfigure project’s southern entrance. Runoff would be addressed via hydrologic source control BMP (HSC-3 Street Trees) designed to maximum extent practicable standards per U.S. Environmental Protection Agency’s Green Streets Manual.

Implementation of the infiltration facilities listed above would include water quality treatment that would ensure that runoff in the post-project condition would not violate any water quality standards or waste discharge requirements. Therefore, the project would not result in new or substantially greater impact on water quality than previously analyzed, and impacts would be less than significant.

No new impact would occur.

Groundwater
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could have an adverse effect related to groundwater. The 2021 FEIR stated that a majority of the City’s water is sourced from imported and recycled water, with approximately 5 percent of the City’s water supply portfolio for Fiscal Year 2019-2020 pumped for municipal use through two groundwater wells (wells #6 and #8). The 2021 FEIR determined that both ATTACHMENT 31
370
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 43 ends

redevelopment and new development on vacant sites would be required to comply with applicable storm water management requirements that focus on retention and infiltration of waters on-site.

Additionally, development at all Housing Sites would be required to comply with current stormwater regulations that prioritize infiltration and treatment of stormwater and generally require increased on-site infiltration and higher standards of water quality protection compared to water quality standards that would have been implemented on existing developed sites. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that they may impede sustainable groundwater management of the basin, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not substantively increase demand for water supply compared to what was evaluated in the 2021 FEIR. In fact, residents in a senior housing development may have lower demand for water supply compared to residents in multi-family units. The project would not utilize a groundwater well and would be served through a standard connection to the City of San Clemente Water Utility, drawing water from the City’s overall supply portfolio. As described above, the project would introduce two infiltrations wells on-site. These infiltration wells would increase infiltration compared to pre-project conditions, and therefore improve groundwater recharge onsite. Therefore, the project would not result in new or substantially greater impact on groundwater supplies or interference with groundwater recharge than previously analyzed, and impacts would be less than significant. No new impact would occur.

Drainage Patterns/Storm Water Runoff
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could result in impacts related to drainage patterns and storm water runoff. The 2021 FEIR determined that development of the Housing Sites would be subject to federal, state, and local regulations aimed at reducing polluted storm water and avoiding overloading the City’s drainage system. Both ministerial and discretionary development would be required to adhere to regulatory requirements including SCMC Chapter 13.40 (Stormwater Runoff Control) which includes requirements for the elimination or reduction of storm water run-off. Impacts associated with drainage patterns and storm water runoff would be less than significant. Adherence to these requirements would ensure that impacts associated with drainage patterns and storm water runoff would be less than significant.

Project
The Hydrology Analysis completed for the project evaluated peak stormwater flows during the 2-, 20-, and 100-year storm events in the pre-project and post-project conditions. As shown in Table 10, ATTACHMENT 31
371
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 44 ends

the project would reduce peak flows during 2-, 20-, and 100-year storm events in the post-project condition. Therefore, the project would not result in new or substantially greater impact related to drainage patterns or storm water runoff than previously analyzed, and impacts would be less than significant. No new impact would occur.

Table 10
Storm Water Flow Rates in Cubic Yards Per Second
Existing Proposed Change
West
2-Year Storm Event 2.60 2.60 0.00
10-Year Storm Event 4.80 4.70 0.00
100-Year Storm Event 7.50 6.75 -0.75
Northeast
2-Year Storm Event 2.90 2.90 0.00
10-Year Storm Event 5.30 5.20 -0.10
100-Year Storm Event 8.20 8.00 -0.20
Southeast
2-Year Storm Event 4.20 4.20 0.00
10-Year Storm Event 7.70 7.70 0.00
100-Year Storm Event 11.80 8.24 -3.56
Flood Hazard/Tsunami Inundation
2021 FEIR
The 2021 FEIR determined that Policy S-2.03 of the Safety Element reinforces application of Federal Emergency Management Agency regulations prohibiting development within a flood zone unless adequate assurances are provided against flood hazards. The 2021 FEIR also determined that the Safety Element update includes policies supporting implantation of adaptation strategies of the Coastal Resiliency Plan and incorporates this future document and the City’s Sea Level Rise Vulnerability Assessment by reference. The 2021 FEIR determined that future development of the Housing Sites would be required to conform to applicable federal, state, and City regulatory standards to effectively avoid and/or address potential impacts associated with development in flood zones, and none of the Housing Sites are within areas anticipated to be affected by tsunami or future sea level rise scenarios. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update determined that impacts associated with flood hazards and tsunami inundation would be less than significant.

Project
The project would be constructed entirely with the footprint of Site V that was evaluated in the 2021 FEIR. Review of Figure 4.8-2 of the 2021 FEIR determined that Site V is not located within a flood hazard zone, and review of Figure 4.8-3 of the 2021 FEIR determined that Site V is not located within the 2021 Tsunami Hazard Area. Therefore, the project would not result in new or substantially greater impact related to flood hazards and tsunami than previously analyzed. No new impact would occur.

ATTACHMENT 31
372
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 45 ends

15.11 Land Use and Planning
Physically Divide an Established Community
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development, and none of the Housing Sites would require any new major infrastructure or improvements that could physically divide an established community. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not physically divide an established community, and impacts would be less than significant.

Project
There are no changes to the project that would affect the conclusions of the FEIR. The project site is located within an urban environment along a developed transportation corridor and was one of the sites evaluated for development in the PEIR. The project would redevelop a vacant hospital facility and supporting structures to a senior housing facility and medical office and would be constructed entirely within the project site without affecting adjacent properties. The project would utilize the existing driveway connections to Camino de los Mares and would not alter the existing circulation network. The project would connect to existing utilities that are already serving the surrounding development. Therefore, the project would not result in new or more severe impacts related to physical division of an established community compared to what was disclosed in the 2021 FEIR.

Conflicts with Plans and Policies
2021 FEIR
The 2021 FEIR determined that adoption of the Safety Element would ensure consistency with state law and provide additional policy in the City’s General Plan for the purpose of avoiding environmental impacts related to wildfire and climate change including sea level rise. The 2021 FEIR determined that future discretionary projects under the Housing Element Update would be subject to implementation of the City’s General Plan Mitigation Monitoring Requirements to ensure environmental impacts are minimized. However, future ministerial development would not be subject to an extensive policy review for consistency with General Plan policies and/or other applicable plans, and impacts related to policy inconsistency would remain significant and unavoidable.

Project
As described in Section 15.5 above, the project would mitigate all potential impacts to cultural resources to a level less than significant. As described in Section 15.7 above, the project would mitigate all potential impacts on paleontological resources to a level less than significant. As described in Section 15.8 above, the project would be consistent with the City’s CAP. As demonstrated throughout this Addendum, all other environmental impacts not requiring mitigation would be less than significant or would have no impact. The project would not cause a new or substantially greater or more severe impacts related to conflicts with any land use plan, policy, or ATTACHMENT 31
373
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 46 ends

regulation adopted for the purpose of avoiding or mitigating an environmental effect compared to what was previously analyzed.

15.12 Mineral Resources
2021 FEIR
The 2021 FEIR determined in Chapter 8.3 that the majority of land within the City is designated as MRZ-1, which is land where adequate geologic information indicates that no significant mineral deposits are present (8,464.95 acres). The remainder, located within the southwestern portion of the City (3,279.23 acres), is designated as MRZ-3, land for which the significance of mineral resources cannot be determined. Neither of these MRZ categories are considered significant mineral resources.

The City’s land use map does not delineate any mineral resource recovery sites or designate any land for mineral resource production. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not impact any known mineral resources that would be of value to the region, the state, or locally.

The 2021 FEIR determined that the City’s land use map does not delineate any mineral resource recovery sites or designate any land for mineral resource production. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not impact any mineral resource recovery sites.

Project
The project site is located in an area designated as MRZ-3, which is not considered a significant mineral resource. The project site is not delineated as a mineral resource recovery site on any land use plans. Therefore, the project would not result in a new or substantially greater impact related to the loss of availability of a known mineral resource that would be of value to the region or residents of the state or the City, compared to what was previously analyzed.

15.13 Noise
Noise Standards
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could have an adverse effect related to noise standards. The 2021 FEIR determined that development of the Housing Sites would not result in any impacts related to vehicular ambient noise, railroad noise, or stationary noise. The 2021 FEIR determined that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of 2021 FEIR Mitigation Framework NOS-1 for ministerial development, would reduce impacts associated with land use noise compatibility to a level less than significant. However, the 2021 FEIR determined even after implementation of Final PEIR Mitigation Framework NOS-2 for ministerial development, impacts related to construction noise would remain significant and unavoidable.

ATTACHMENT 31
374
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 47 ends

Project
A site-specific Noise and Vibration Impact Analysis was prepared for the project (Appendix L). Two long-term noise measurements were recorded in the vicinity of the project site in order to calculate the average hourly equivalent level (Leq) and community noise equivalent level (CNEL) at each location, which incorporate the evening and nighttime hours. Sources that dominate the existing noise environment include traffic on I-5, light traffic on Camino de los Mares, and occasional aircraft noise. Noise measurement data collected during the long-term noise monitoring are summarized in Table 11. Figure 4 presents the noise measurement locations.

Table 11
Existing Noise Level Measurements—Long Term
Location Description Date
Daytime
Noise Levels1
(dBA Leq)
Evening
Noise Levels2
(dBA Leq)
Nighttime
Noise Levels3
(dBA Leq)
Daily Noise
Level
(CNEL)
LT-1 654 Camino de los Mares, on
top of roof, near southwest
corner of building,
approximately 3 ft from edge of
roof, 300 ft from I-5 centerline.
4/13/2022 66.9–68.0 65.2–67.0 59.4–66.8 71.0
LT-2 654 Camino de los Mares, north
side of building facing Camino
de los Mares, approximately
80 ft from Camino de los Mares
centerline.
4/13/2022 61.8–62.9 59.3–61.4 46.6–60.7 64.1
SOURCE: Appendix L.
1 Daytime Noise Levels = noise levels during the hours from 7:00 a.m. to 7:00 p.m. 2Evening Noise Levels = noise levels during the hours from 7:00 p.m. to 10:00 a.m. 3Nighttime Noise Levels = noise levels during the hours from 10:00 p.m. to 7:00 a.m.

CNEL = Community Noise Equivalent Level
dBA = A-weighted decibels
ft = foot/feet
I-5 = Interstate 5
Leq = equivalent continuous sound level
Short-term Construction Impacts
Two types of short-term noise impacts would occur during project construction: (1) equipment delivery and construction worker commutes; and (2) project construction operations.

The first type of short-term construction noise would result from transport of construction equipment and materials to the project site and construction worker commutes. Based on the Air Quality and Greenhouse Gas Impact Analysis for the San Clemente Senior Housing Project, the project would generate an estimated total of 285 hauling truck trips over a 20-day demolition phase (14 trips per day) and an estimated total of 1,357 hauling truck trips over a 35-day grading phase (39 trips per day) (see Appendix C). These transportation activities would incrementally raise noise levels on access roads leading to the site. It is expected that larger trucks used in equipment delivery would generate higher noise impacts than trucks associated with worker commutes. The single-event noise from equipment trucks passing at a distance of 50 feet from a sensitive noise receptor would reach a ATTACHMENT 31
375
FIGURE 4
Noise Measurement Locations
!(
!(

CAMPANILLA

CAMINO DE LOS MARES
§¨¦5
1 2
!(
!(

CAMPANILLA

CAMINO DE LOS MARES
§¨¦5
1 2
Image Source: NearMap (flown June 2022)
0 Feet 200 [
Project Boundary
!( Noise Measurement Location
M:\JOBS5\9335.6\common_gis\MXD\fig4_EIR.mxd 09/28/2022 bma ATTACHMENT 31
376
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 49 ends

maximum level of 84 A-weighted decibels maximum sound level (dBA Lmax). However, the pieces of heavy equipment for grading and construction activities would be moved on-site just one time and would remain on-site for the duration of each construction phase. This one-time trip, when heavy construction equipment is moved on- and off-site, would not add to the daily traffic noise in the project vicinity. The total number of daily vehicle trips would be minimal when compared to existing traffic volumes on the affected streets, and the long-term noise level change associated with these trips would not be perceptible. Therefore, equipment transport noise and construction-related worker commute impacts would be short-term and would not result in a significant off-site noise impact.

The second type of short-term noise impact is related to noise generated during demolition, site preparation, grading, building construction, architectural coatings, and paving on the project site.

Construction is undertaken in discrete steps, each of which has its own mix of equipment, and, consequently, its own noise characteristics. These various sequential phases would change the character of the noise generated on the project site. Therefore, the noise levels vary as construction progresses. Composite noise level of each construction phase was calculated as presented in Table 12.

Table 12
Potential Construction Noise Impacts by Phase
Phase Equipment (Quantity)
Composite Noise Level at
50 feet (dBA Leq)
Demolition Concrete Saw (1), Excavator (1), Dozer (2) 86 Site Preparation and
Grading
Excavator (1), Grader (1), Dozer (2), Tractor
(2) 87
Building Construction Crane (1), Forklift (3), Tractor (2) 84 Paving Paver (2), Paving Equipment (2), Roller (2) 86
Architectural Coating Air Compressor (1) 74
SOURCE: Appendix L.
dBA Leq = average A-weighted hourly noise level
Composite construction noise levels at a distance of 50 feet would range from 74 dBA Leq to 87 dBA Leq, with the highest noise levels occurring during the site preparation phase. The Noise and Vibration Analysis then adjusted noise levels based on distances to the nearest sensitive receptor. Table 13 shows the nearest sensitive uses that surround the project site, the distances of their respective property lines from the center of construction activities, which represents the acoustic center of construction noise, and the noise levels expected during site preparation and grading activities, which would generate the greatest noise levels. These noise level projections do not take into account intervening topography or barriers, and therefore can be considered conservative estimates.

ATTACHMENT 31
377
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 50 ends

Table 13
Potential Construction Noise Impacts During Site Preparation and Grading Receptor Distance (feet) Noise Level (dBA Leq)
San Clemente Villas Senior Living (Southeast) 260 73
Commercial (West and North) 350 70
SOURCE: Appendix L.
dBA Leq = average A-weighted hourly noise level
While construction noise will vary, it is expected that composite noise levels during construction at the nearest off-site residential land uses to the southeast would reach 73 dBA Leq during the site preparation phase. It is expected that composite noise levels during construction at the nearest commercial land uses to the west and north would reach 70 dBA Leq. These predicted noise levels would only occur when all construction equipment is operating simultaneously at the closest point of construction, and therefore are assumed to be conservative in nature. While construction-related short-term noise levels have the potential to be higher than existing ambient noise levels in the project area under existing conditions, the noise impacts would no longer occur once project construction is completed.

Noise impacts associated with construction activities are regulated by the City’s noise ordinance. The project would be required to comply with the construction hours specified in the City’s Noise Ordinance, which states that construction activities are allowed between 7:00 a.m. and 6:00 p.m., Monday through Friday, and between 8:00 a.m. and 6:00 p.m. on Saturday. Construction is not permitted outside of these hours, on a Sunday, or on a City-recognized holiday, unless a temporary waiver is granted by the development services director or his/her authorized representative, or in emergencies, including maintenance work on City rights-of-way.

As it relates to off-site uses, construction-related noise impacts would remain below the 80 dBA Leq and 85 dBA Leq construction noise level criteria, as established by the Federal Transit Authority (FTA) for residential and commercial land uses, respectively. Therefore, impacts associated with construction noise would be considered less than significant. To minimize noise impacts even further to the extent feasible, the project construction would utilize the following practices:
• All construction vehicles or equipment, fixed or mobile, operated within 1,000 ft of a dwelling shall be equipped with operating and maintained mufflers. • Stockpiling and/or vehicle storage areas shall be located as far as practicable from and out of view of dwellings.

Therefore, the project would not result in a new or substantially greater impact related to construction noise compared to what was previously analyzed, and impacts would be less than significant. No new impact would occur.

Operational Traffic Noise Impacts on Off-Site Receivers The project would generate 1,080 daily trips. The Noise and Vibration Analysis evaluated potential traffic noise impacts on off-site receivers based on a peak-hour traffic volume of 1,899 vehicle trips on Camino de los Mares. Assuming the ADT is ten times the peak-hour traffic, the ADT in the vicinity ATTACHMENT 31
378
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 51 ends

of the project would be 18,990 vehicle trips. The addition of project-related vehicle trips would result in an increase of approximately 0.24 CNEL along Camino de los Mares. A noise level increase of less than 3 dBA would not be perceptible to the human ear. Therefore, the project would not result in a new or substantially greater impact related to traffic noise impacts on off-site receivers compared to what was previously analyzed, and impacts would be less than significant. No new impact would occur.

Operational On-Site Generated Noise
The project would include rooftop heating, ventilation, and air conditioning (HVAC) units. While Building 3 (Health Center Building) would contain rooftop HVAC equipment, noise impacts would only occur during daytime operational hours. For the proposed living units in Buildings 1 and 2, the HVAC equipment could operate 24 hours per day. The Noise and Vibration Analysis estimated that rooftop HVAC equipment for a single unit would generate a noise level of 66.6 dBA Leq at 5 feet.

Table 14 presents the noise levels from HVAC equipment at the nearest noise-sensitive location. The closest off-site sensitive uses to the proposed location of an on-site HVAC unit would be located approximately 140 feet away. According to the site plan, 20 banks of HVAC units are proposed to be installed. Per the building plans, each building would have parapet walls to hide the mechanical equipment, which would reduce noise levels by a minimum of 5 dBA, resulting in a reference level of 72.4 dBA Leq at 5 feet from each bank of HVAC units. After distance attenuation, noise generated from the four closest banks of HVAC equipment would be up to 48.0 dBA Leq at the nearest sensitive use. This noise level would not exceed the City’s exterior daytime (7:00 a.m. to 11:00 p.m.) and nighttime (11:00 p.m. to 7:00 a.m.) noise standards of 55 dBA Leq and 50 dBA Leq, respectively.

Additionally, the projected noise level would be below the quietest existing ambient noise levels at the nearest off-site sensitive building façade. The other 16 banks of HVAC equipment would be further away and would receive greater noise reduction due to additional rooftop parapet shielding, and thus are not expected to contribute to the combined noise level. Therefore, the project would not result in a new or substantially greater impact related to operational on-site noise compared to what was previously analyzed, and impacts would be less than significant. No new impact would occur.

ATTACHMENT 31
379
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 52 ends

Table 14
Summary of HVAC Noise Levels
Off-Site
Land Use
(Direction)
Distance
from HVAC
Units
(ft)
Reference Noise
Level for 1 Unit
at 5 ft
(dBA Leq)
Reference Noise for
a Bank of 12 Units
at 5 ft
(dBA Leq)
1 Distance
Attenuation
(dBA)
Noise
Level
(dBA Leq)
Combined
Noise
Level
(dBA Leq)
San
Clemente
Villas Senior
Living
(Southeast)
140

66.6 72.4
29 43.0

48.0 150 30 43.0
190 32 41.0
195 32 41.0
SOURCE: Appendix L.
1 Includes a minimum reduction of 5 dBA provided by rooftop parapet walls. dBA = A-weighted decibel(s)
ft = foot/feet
HVAC = heating, ventilation, and air conditioning
Leq = equivalent continuous sound level
On-Site Land Use Compatibility
While impacts to the project site from the surrounding environment are not considered an impact related to CEQA, the following analysis assesses compliance with the local land use compatibility standards. The project is in an area where parcels to the east, west, and north are currently occupied and operational. For this reason, this analysis relies on the existing measured noise levels as well as future predicted noise levels to provide the most accurate description of the noise environment related to traffic noise impacts. The City’s General Plan does not provide land use compatibility standards for future development. Therefore, for the purposes of this analysis, the County’s exterior noise level standard of 65 CNEL was used to determine project compatibility. The interior noise level standard for residential uses is 45 CNEL.

Exterior Noise Assessment
As shown in Table 11 above, the existing measured noise levels at the project site range from approximately 64.1 CNEL on the northern portion of the site, close to Camino de los Mares, to

71.0 CNEL on the southern portion of the site, close to I-5.

To assess the exterior noise levels at the proposed pool area south of Building 1, the future noise levels were based on existing measured noise levels and an estimated noise increase based on future growth. The Noise and Vibration Impact Analysis determined that the annual average daily traffic (AADT) on I-5 in the vicinity of the project is 179,700. The estimated future AADT, assuming a time period of 20 years and a 1 percent growth rate, would be 215,640, resulting in a 0.8 dB increase.

Therefore, the exterior noise levels at the recreational pool area closest to I-5 would approach 72 CNEL.

The project would include a six-foot-high combo masonry and glass pool barrier that would be located around the pool area at Building 1. Additionally, the project would include a six-foot-high combo stucco wall and glass safety and sound barrier that would be located at the perimeter of the ATTACHMENT 31
380
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 53 ends

rooftop deck. Noise levels would be reduced by approximately 8 dBA at each location, resulting in a noise level of 64 CNEL. Noise levels at these locations would be below the County’s 65 CNEL exterior noise level standard. Therefore, with the proposed barriers, no additional noise reduction features would be necessary to comply with land use compatibility standards.

The project would also include an additional outdoor recreation area in the form of the central courtyard in the northern portion of Building 2, which would be considered an exterior sensitive use.

With future exterior noise levels approaching 64.4 CNEL (existing noise level of 64.1 CNEL + 0.3 CNEL growth from the project) and significant noise reduction provided by the building on all sides, the noise level would be well below the County’s 65 CNEL exterior noise level standard. Therefore, no additional noise reduction features would be required. All other courtyard areas including those between Building 1 and Building 2, as well as the courtyard on the southern portion of Building 2 are not considered noise sensitive as they are points of access from the exterior sidewalks and interior units. Therefore, the project would not result in a new or substantially greater impact related to exterior noise compatibility compared to what was previously analyzed, and impacts would be less than significant. No new impact would occur.

Interior Noise Assessment
Per Title 24 of the California Code of Regulations, an interior noise level standard of 45 CNEL or less is required for all habitable rooms (i.e., rooms used for living, sleeping, eating, and cooking).

Consistent with the 2021 FEIR, which incorporated by reference the City’s General Plan Mitigation Monitoring Requirements, the Noise and Vibration Impact Analysis included a detailed analysis of the noise reduction requirements and needed noise insulation features in order to meet the interior noise standards (City’s General Plan Mitigation Monitoring Program Measure 10-1). Based on the expected future exterior noise levels at the southern façades of Buildings 1 and 2 closest to I-5, noise levels would approach 72 CNEL and a minimum noise reduction of 27 dBA would be required.

Because the project would include a form of mechanical ventilation, windows and doors could remain closed.

The Noise and Vibration Impact Analysis utilized previously completed sample interior noise calculations assume standard building construction and upgraded window assemblies. Based on reference information from transmission loss test reports for various Milgard windows, the southern, western, and eastern façades would require windows with sound transmission class (STC) ratings of approximately 30–35, depending on the glass-to-wall ratio at the façades with a view of I-5. For units facing Camino de los Mares, as well as units facing the center of the project buildings, interior noise levels of 45 CNEL or less would be achieved by using standard building construction along with standard windows (typically in the STC 25–28 range). Therefore, the project would not result in a new or substantially greater impact related to interior noise compared to what was previously analyzed, and impacts would be less than significant. No new impact would occur.

Groundborne Noise and Vibration
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could generate excessive groundborne vibration or groundborne ATTACHMENT 31
381
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 54 ends

noise. The 2021 FEIR determined that implementation of the City’s General Plan Mitigation Monitoring Program for future discretionary development, and implementation of 2021 FEIR Mitigation Framework NOS-3 for ministerial development, would reduce impacts associated with excessive groundborne vibration and groundborne noise to a level less than significant.

Project
An analysis of construction vibration using vibration levels in VdB for human annoyance and assessing the potential for building damages using vibration levels in PPV (in/sec). This is because vibration levels calculated in root-mean-square (RMS), representing an average condition, are best for characterizing human response to building vibration, while calculating vibration levels in PPV is best for characterizing the potential for damage representing maximum vibration conditions.

In order to determine the potential for annoyance, the distance between the nearest off-site buildings and the center of project construction is utilized to represent the average condition. To assess potential vibration damage, the distance of assessment is measured between the nearest offsite buildings and the project construction boundary (assuming the construction equipment would be used at or near the project setback line). Bulldozers and other heavy-tracked construction equipment (expected to be used for this project) would generate approximately 0.089 PPV in/sec or 87 VdB of groundborne vibration when measured at 25 feet, based on the FTA Manual.

As shown in Table 15, vibration levels are expected to approach 56 VdB at the closest residence located immediately southeast of the project site and 53 VdB at the closest commercial uses located west and north of the project site, which are below the 78 VdB and 84 VdB thresholds for annoyance, respectively.

The closest structure to the project site is the residence to the southeast of the site, approximately 25 ft from the limits of construction activity. As shown in Table 16, it is expected that vibration levels generated by dump trucks and other large equipment that would be as close as 25 ft from the property line would generate groundborne vibration levels of up to 0.089 PPV (in/sec) at the closest structure to the project site and would not exceed the 0.2 PPV (in/sec) threshold. All other structures are further away and would experience lower vibration levels. Because construction activities are regulated by the City’s Municipal Code, which states that construction activities are only allowed between 7:00 a.m. and 6:00 p.m., Monday through Friday, and between 8:00 a.m. and 6:00 p.m. on Saturday, vibration impacts would not occur during the more sensitive nighttime hours.

ATTACHMENT 31
382
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 55 ends

Table 15
Potential Construction Vibration Annoyance Impacts at Nearest Receptor Receptor (Location)
Reference
Vibration Level
(VdB) at 25 ft1 Distance (ft)2
Vibration Level
(VdB)
Residence (Southeast) 87 260 56
Commercial (West and North) 350 53
SOURCE: Appendix L. 1
The reference vibration level is associated with a large bulldozer, which is expected to be representative of the heavy equipment used during construction.
2 The reference distance is associated with the average condition, identified by the distance from the center of construction activities to surrounding uses.
ft = foot/feet
VdB = vibration velocity decibel(s)
Table 16
Potential Construction Vibration Damage Impacts at Nearest Receptor Receptor (Location)
Reference Vibration
Level (PPV) at 25 ft1 Distance (ft)2
Vibration
Level
(PPV)
Residence (Southeast)

0.089
25 0.089
Commercial (West) 40 0.044
Commercial (North) 120 0.008
SOURCE: Appendix L. 1
The reference vibration level is associated with a large bulldozer, which is expected to be representative of the heavy equipment used during construction.
2 The reference distance is associated with the peak condition, identified by the distance from the perimeter of construction activities to surrounding structures. ft = foot/feet
PPV = peak particle velocity
The streets surrounding the project site are paved, smooth, and unlikely to cause significant groundborne vibration. Additionally, the rubber tires and suspension systems of buses and other on road vehicles make it unusual for on-road vehicles to cause groundborne noise or vibration problems. Additionally, once constructed, the project would not contain uses that would generate groundborne vibration. Therefore, the project would not result in a new or substantially greater impact related to vibration compared to what was previously analyzed, and impacts would be less than significant. No new impact would occur.

Aircraft Noise
2021 FEIR
The 2021 FEIR determined that no portions of the City are within the 65 CNEL noise contours of any airport and the Housing and Safety Elements Update would not expose people residing or working in the area to excessive noise levels.

ATTACHMENT 31
383
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 56 ends

Project
The project site is not located within 65 CNEL noise contours of any airport. Therefore, the project would not result in a new or substantially greater impact related to exposure of people to excessive airport noise levels compared to what was previously analyzed in the 2021 FEIR.

15.14 Population and Housing
Induce Unplanned Population Growth
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that does not have the potential to add growth or population to the City. The 2021 FEIR determined that the Housing Element Update would allow for development of residential units to meet the City’s future housing needs identified in the 2020 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) and assist in the City’s ability to meet its RHNA goals. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not induce substantial unplanned population growth in an area, either directly or indirectly, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The proposed residential component would be consistent with the zoning designation evaluated as part of the FEIR. The project would be growth accommodating based on the demand for housing in the region and would support the City’s Housing Element RHNA goals. Therefore, the project would not induce new or substantially greater impacts related to unplanned population growth compared to what was previously analyzed in the 2021 FEIR.

Displace People or Housing
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that does not have the potential to redevelop existing housing. The 2021 FEIR determined that implementation of the Housing Element Update would result in an increase in housing units in the City. Although the Housing Element Update would displace residential uses at two rezone sites, replacement housing would expand opportunities for housing in the City by providing increased density at redeveloped sites. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not displace substantial numbers of existing housing or people, and impacts would be less than significant.

ATTACHMENT 31
384
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 57 ends

Project
The project site consists of a vacant hospital facility, does not possess any housing, and its redevelopment would not displace any residents. Therefore, the project would not result in new or substantially greater impacts relating to the displacement of existing people or housing compared to what was evaluated in the 2021 FEIR.

15.15 Public Services and Recreation
Fire Protection
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that does not have the potential to add growth or population to the City and would not, in itself have an impact on the need for new fire protection facilities. The 2021 FEIR determined that development at the Housing Sites would not directly result in sufficient demand to require construction of new fire facilities, since each incremental housing development would pay its fair share toward anticipated fire facility needs.

Furthermore, construction of any future fire facilities would be under a separate environmental review and approval. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not result in substantial adverse physical impacts associated with the provision of new or physically altered fire protection facilities, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would still be consistent with the Housing Element Update goal of meeting the City’s future housing needs identified in the 2020 RTP/SCS and comply with state law. Furthermore, the addition of 12 units compared to what was evaluated in the PEIR would not substantially increase demand for fire protection services. Therefore, the project would not result in a new or substantially greater need for new or altered public service facilities than previously analyzed, and impacts would be less than significant. No new impact would occur.

Police Protection
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that does not have the potential to add growth or population to the City and would not, in itself have an impact on the need for new police protection services. The 2021 FEIR determined that development at the Housing Sites would not directly result in sufficient demand to require construction of new police facilities, since each incremental housing development would pay its fair share toward anticipated police facility needs. Furthermore, construction of any future police facilities would be under a separate environmental review and approval. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not result in substantial adverse physical impacts associated with the ATTACHMENT 31
385
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 58 ends

provision of new or physically altered police protection facilities, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would still be consistent with the Housing Element Update goal of meeting the City’s future housing needs identified in the 2020 RTP/SCS and comply with state law. Furthermore, the addition of 12 units compared to what was evaluated in the 2021 FEIR would not substantially increase demand for police protection services. Therefore, the project would not result in a new or substantially greater need for new or altered police protection facilities than previously analyzed, and impacts would be less than significant. No new impact would occur.

Schools
2021 FEIR
The PEIR determined that the Safety Element Update is a policy document that does not have the potential to add growth or population to the City needing school services. The PEIR determined that development at the Housing Sites would not directly result in sufficient demand to require construction of new school facilities, since each incremental housing development would pay its fair share toward anticipated school facility needs. Furthermore, construction of any future school facilities would be under a separate environmental review and approval. Therefore, the PEIR determined that the Housing and Safety Elements Update would not result in substantial adverse physical impacts associated with the provision of new or physically altered school facilities, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not serve families with school-aged children. Consequently, the project would not generate a new student population that would increase demand for school services. Therefore, the project would not result in the need for new or altered school facilities. No new impact would occur.

Library Services
2021 FEIR
The PEIR determined that the Safety Element Update is a policy document that does not have the potential to add growth or population to the City needing additional public services such as libraries.

The PEIR determined that development at the Housing Sites would not directly result in sufficient demand to require construction of new public facilities such as libraries, since each incremental housing development would pay its fair share toward anticipated facility needs. Furthermore, construction of any future public facilities would be under a separate environmental review and ATTACHMENT 31
386
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 59 ends

approval. Therefore, the PEIR determined that the Housing and Safety Elements Update would not result in substantial adverse physical impacts associated with the provision of new or physically altered public facilities such as libraries, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not substantively increase demand for additional public services such as libraries compared to what was evaluated in the PEIR. Therefore, the project would not affect existing public facilities related to library services. No new impact would occur.

Parks and Recreation Facilities
2021 FEIR
The PEIR determined that the Safety Element Update is a policy document that does not have the potential to add growth or population to the City needing park services. The PEIR determined that development at the Housing Sites would not directly result in sufficient demand to require construction of new park facilities, since each incremental housing development would pay its fair share toward anticipated park facility needs. Furthermore, construction of any future park facilities would be under a separate environmental review and approval. Therefore, the PEIR determined that the Housing and Safety Elements Update would not result in substantial adverse physical impacts associated with the provision of new or physically altered park facilities, and impacts would be less than significant.

The 2021 FEIR determined that development of the Housing Sites would increase use of existing park facilities and increase demand for additional park and recreation facilities. However, future residential units developed under the project would be required to pay in-lieu fees consistent with the Quimby Act to pay for additional park facilities within the City. Payment of such fees would allow the City to continue to implement numerous General Plan policies in place to maintain park and recreation facilities within the City. Furthermore, construction of any future park facilities would be under a separate environmental review and approval. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not substantively increase demand for parkland and recreational services compared to what was evaluated in the PEIR. Furthermore, the project would be required to pay park-in-lieu fees that would fund City public park facilities based on forecasted City-wide park ATTACHMENT 31
387
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 60 ends

demand. The project also proposes both indoor and outdoor amenities for the residents, including a common clubroom, fitness center, roof-top deck, resort style pool deck, landscaped courtyards, and central paseo walkway. These amenities would be located entirely within the project footprint.

The project park demands would be consistent with what was analyzed in the 2021 FEIR. No new or more severe impacts related to park and recreation facilities would result compared to what was analyzed in the 2021 FEIR. The project would not result in any new impacts or a substantial increase in severity of impacts related to parkland deterioration or provision of recreational facilities compared to what was evaluated in the 2021 FEIR.

15.16 Transportation
Circulation System
2021 FEIR
The 2021 FEIR determined that adoption of the Housing and Safety Elements Update would not physically impact any existing roadway, pedestrian, bicycle, or transit facilities. Future site-specific projects at Housing Sites would be subject to an engineering and design review that would ensure consistency with applicable policies related to transit, roadway, bicycle, and pedestrian facilities.

Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not conflict with a plan, ordinance, or policy addressing the circulation system, and impacts would be less than significant.

Project
The project would be consistent with the City’s General Plan Mobility and Complete Streets Element because it would continue to provide safe access to the site for all users. Sidewalks are provided to access adjacent uses (e.g., Ocean View Plaza), consistent with the policies outlined in the City’s Bicycle and Pedestrian Master Plan. The project would also be consistent with Policy M-2.07 because it would provide a mix of senior housing and medical office uses, and is located along an existing transit route (Orange County Transit Authority Route 1, Long Beach to San Clemente) on Camino de los Mares.

The project would not alter any existing transportation facilities adjacent to and surrounding the project site (e.g., vehicular, transit, bicycle, or pedestrian). The project would utilize the existing driveway connections to Camino de los Mares. In order to reinforce the right-in and right-out turning movements at the western driveway, the project would make median improvements within Camino de Los Mares, and introduce signage and a center island at the driveway entrance to direct traffic.

These changes would improve safety for turns into or out of the western driveway. The project would not make any other changes to the existing circulation network. Similarly, the project would not preclude implementation of a Class 3 Bike Route along Camino de los Mares as recommended in the City’s Bicycle and Pedestrian Master Plan. Therefore, the project would not result in a new or substantially greater conflict with a plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities than previously analyzed, and impacts would be less than significant. No new impact would occur.

ATTACHMENT 31
388
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 61 ends

Vehicle Miles Traveled
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that does not have the potential to add growth or population to the City that would increase VMT. The 2021 FEIR determined that development of the Housing Sites in conjunction with buildout of the City’s General Plan land use map and transportation network would result in a VMT efficiency representing 158 percent of the regional average for Orange County. This would be a significant impact.

Implementation of 2021 FEIR Mitigation Framework TRA-1 would ensure that future ministerial development implements applicable General Plan policies that promote reduction in VMT, including the implementation of Transportation Demand Management programs. However, the effectiveness of VMT reducing measures is context-sensitive and would vary depending on the site-specific project site. Therefore, impacts associated with VMT would remain significant and unavoidable.

Project
A Vehicle Miles Traveled Analysis was prepared for the project to identify whether the project’s VMT generation would be consistent with the assumptions used in the 2021 FEIR for the project site (Appendix M). The project site was evaluated as a potential rezone site (Site V) in the 2021 FEIR. The 2021 FEIR analysis assumed the site would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. Compared to the 2021 FEIR analysis for the site, the project has been slightly revised to propose 250 senior housing units and 7,500 square feet of medical offices.

Table 17 presents a comparison of trip generation based on the land uses assumed in the 2021 FEIR compared to the current project. The current project consists of senior housing units rather than typical multi-family dwelling units that were evaluated in the 2021 FEIR. Similarly, the current project consists of medical office use rather than commercial (general office) use which was used as the basis for trip generation in the 2021 FEIR. As shown in Table 17, Site V was estimated to generate 1,162 ADT, and the current project is estimated to generate 1,080 ADT based on trip rates referenced from the Institute of Transportation Engineers Trip Generation Manual, 11th Edition. Overall, trip generation would decrease compared to the 2021 FEIR.

ATTACHMENT 31
389
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 62 ends

Table 17
Project Trip Generation Comparison
Development
Assumptions
Trip Rate
(ADT/Unit or
TSF)
Average Daily
Trips
2021 FEIR Trip Generation
Multi-family Housing (Mid-Rise) 238 DU 4.54 1,081
General Office Building 7.500 TSF 10.84 81
Total 2021 FEIR Trip Generation 1,162
Project Trip Generation
Senior Adult Housing – Multi-family 250 DU 3.24 810
Medical-Dental Office Building –Stand-Alone 7.500 SF 36.00 270 Total Current Project Trip Generation 1,080
Net Trip Generation (Project – 2021 FEIR) (82)
SOURCE: Appendix M.

ADT = average daily trips
TSF = thousand square feet
DU = dwelling unit
In addition to the reduced average daily trips, the land uses proposed by the current project land would generate trips with shorter trip lengths than the uses previously analyzed in the 2021 FEIR, because the senior housing units would not be associated with a home-work commute for most units. Additionally, the medical office building would likely be used by the adjacent senior housing residents, reducing the distance of potential trips for medical needs. The proposed medical office building would offer other residential uses in the City a more convenient location than existing medical offices farther away.

Internal trip capture reductions were calculated between the proposed uses due to the interaction between the senior housing and medical office uses on site. Internal trip capture reductions were estimated using the National Cooperative Highway Research Program (NCHRP) 684 Trip Capture Estimation Tool, which is referenced in the ITE Trip Generation Handbook, 3rd Edition (2017). Based on the NCHRP 684 Trip Capture Estimation Tool, 3 percent of the senior housing outbound trips and 6 percent of the medical office inbound trips would occur internally during the AM peak-hour. Four percent of the senior housing outbound trips and 11 percent of the medical office inbound trips would occur internally during the PM peak-hour. The internal trip capture concept could also be applied to the senior housing use east of the project site (San Clemente Villas by the Sea), as those residents would be able to walk to the proposed medical office building rather than driving to other medical office buildings in San Clemente or beyond.

Furthermore, the project site is immediately east of Ocean View Plaza with a variety of uses including restaurant, retail, bank, supermarket, and drugstore. The future senior housing residents would be able to walk to these nearby uses rather than driving to similar uses in the City and beyond, which would result in a reduction in VMT. Due to the combination of lower trip generation and reduced trip length, the current project would generate less VMT compared to the previous project that was evaluated in the 2021 FEIR. Therefore, the project would not result in a new or substantially greater impact related to VMT than previously analyzed.

ATTACHMENT 31
390
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 63 ends

The 2021 FEIR concluded impacts related to VMT would be significant and unavoidable because VMT/capita would exceed the regional average for Orange County. The 2021 FEIR referenced consistency with Mobility Element Policy 1.21 as a means to reduce single-occupant vehicles and encourage alternative modes of transportation. The project, as discussed above is VMT reducing as it would locate senior housing in proximity to a medical office building and in proximity to other services within walking distance. The project incorporates pedestrian access to facilitate and encourage walking. The project has demonstrated consistency with City policy related to VMT reduction to the extent feasible. Implementation of the project would result in reduced VMT compared to what was analyzed in the 2021 FEIR. No new impacts or more severe impacts related to VMT would occur.

Hazards Due to a Design Feature
2021 FEIR
The 2021 FEIR determined that the Housing and Safety Elements Update did not propose any changes to the existing roadway network, and future site-specific development would be designed consistent with established roadway design standards. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not substantially increase hazards, and impacts would be less than significant.

Project
The project would utilize the existing driveway connections to Camino de los Mares. In order to reinforce the right-in and right-out turning movements at the western driveway, the project would make median improvements within Camino de Los Mares, and introduce signage and a center island at the driveway entrance to direct traffic. These changes would improve safety for turns into or out of the western driveway. The project would not make any other changes to the existing circulation network. Any modifications to the existing connections to Camino de los Mares would be completed consistent with applicable safety standards. Therefore, the project would not result in a new or substantially greater increase hazards due to a geometric design feature or incompatible use than previously analyzed, and impacts would be less than significant. No new impact would occur.

Emergency Access
2021 FEIR
The 2021 FEIR determined that the Housing and Safety Elements Update did not propose any changes to the existing roadway network, and access for future site-specific development to the existing roadway network would be configured consistent with established roadway design standards that would allow for emergency access. The City would continue to implement the MultiHazard Emergency Plan to ensure adequate emergency access within the City. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not result in inadequate emergency access, and impacts would be less than significant.

ATTACHMENT 31
391
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 64 ends

Project
The project site is located within an urban environment along a developed transportation corridor that would allow for emergency access. The project would utilize the existing driveway connections to Camino de los Mares. In order to reinforce the right-in and right-out turning movements at the western driveway, the project would make median improvements within Camino de Los Mares, and introduce signage and a center island at the driveway entrance to direct traffic. These changes would improve safety for turns into or out of the western driveway and support emergency access. The project would not make any other changes to the existing circulation network. Any modifications to the existing connections to Camino de los Mares would be completed consistent with applicable safety standards related to emergency access. Therefore, the project would not result in new or substantially greater inadequate emergency access than previously analyzed, and impacts would be less than significant. No new impact would occur.

15.17 Utilities and Service Systems
Utility Infrastructure
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that is a policy document that would not result in any physical development that would require utility services. The 2021 FEIR determined that future development at the Housing Sites would be located within existing developed areas with access to utility infrastructure. Utility infrastructure improvements and relocations associated with the future Housing Sites would be evaluated in their respective subsequent environmental documents for discretionary projects, or as part of the ministerial review that will be implemented through an overlay zone that includes objective standards and requirements to reduce physical impacts to the extent feasible, and impacts would be less than significant.

Project
Existing utility services are available adjacent to the site, and improvements would be limited to extension of pipelines onto the project site. Consequently, potential impacts associated with proposed on-site utility facilities have been considered within this environmental document. The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not substantively increase demand for utility services compared to what was evaluated in the 2021 FEIR. In fact, residents in a senior housing development may have lower utility demand compared to residents in multi-family units. Therefore, the project would not result in a new or substantially greater increase in demand for utility services than previously analyzed, and impacts would be less than significant. No new impact would occur.

ATTACHMENT 31
392
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 65 ends

Water Supply
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that would increase demand for water supply. The City’s UWMP anticipated that it would be able to acquire necessary water supplies to meet demand through 2045.

Future residential uses anticipated in the Housing Element sites inventory and potential rezone sites would accommodate future population growth within the City anticipated by SCAG and would not introduce additional housing beyond what is projected. The 2021 FEIR determined that the Housing Sites have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not substantively increase demand for water supply compared to what was evaluated in the 2021 FEIR. In fact, residents in a senior housing development may have lower demand for water supply compared to residents in multi-family units. Therefore, the project would not result in a new or substantially greater increase in demand for water supply than previously analyzed, and impacts would be less than significant. No new impact would occur.

Wastewater Treatment
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that would increase demand for wastewater treatment. Development at the Housing Sites would accommodate future population growth within the City anticipated by SCAG. Therefore, the project would not introduce additional housing that is not anticipated within the City, and would not increase demand for wastewater treatment beyond what has been planned and is anticipated by the City’s service providers, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not substantively increase demand for wastewater treatment compared to what was evaluated in the 2021 FEIR. In fact, residents in a senior housing development may have lower demand for wastewater treatment compared to residents in multi-family units. Therefore, the project would not result in a new or substantially greater increase in demand for wastewater treatment than previously analyzed, and impacts would be less than significant. No new impact would occur.

ATTACHMENT 31
393
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 66 ends

Solid Waste
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that would generate solid waste. The 2021 FEIR determined that adequate landfill capacity exists to serve development of the Housing Sites, and impacts would be less than significant. The 2021 FEIR additionally determined that the project would comply federal, state, and local management and reduction statutes related to solid waste, and impacts would be less than significant.

Project
The project site was evaluated as a potential rezone site (Site V) in the Housing Element Update that would be redeveloped with 238 multi-family residential units and 7,500 square feet of commercial space. The project has been slightly revised compared to the Housing Element Update to develop 250 senior housing units and 7,500 square feet of medical offices. The redesigned residential component would not substantively increase solid waste generation compared to what was evaluated in the 2021 FEIR. Therefore, the project would not result in a new impact or substantial increase in severity of impacts related to solid waste generation.

Regarding consistency with regulations and policies, the City would continue to implement General Plan policies to reduce amount of material disposed at landfills, and the project would be subject to the same requirements. Therefore, the project would not result in a new or substantially greater impact related to conflicts with statutes and regulations related to solid waste compared to what was analyzed in the 2021 FEIR.

15.18 Wildfire
Emergency Response Plans
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development, and the Housing Sites are located within existing developed areas and along major transportation corridors in the City that would allow for evacuation and response.

Development at the Housing Sites would not physically interfere with any emergency response or evacuation plans because they would not include any features that would prevent continued implementation of these plans, and impacts would be less than significant.

Project
The project site is located within an urban environment along a developed transportation corridor that would allow for emergency evacuation. The project would utilize the existing driveway connections to Camino de los Mares. In order to reinforce the right-in and right-out turning movements at the western driveway, the project would make median improvements within Camino de Los Mares, and introduce signage and a center island at the driveway entrance to direct traffic.

These changes would improve safety for turns into or out of the western driveway and support ATTACHMENT 31
394
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 67 ends

emergency response and evacuation. The project would not make any other changes to the existing circulation network. Therefore, the project would not result in any new impacts or substantially increase the severity of impacts related to emergency response plans or emergency evacuation plans beyond what was previously analyzed in the 2021 FEIR.

Wildfire
2021 FEIR
The 2021 FEIR determined that the Safety Element is a policy document that would not result in any physical development, and implementation of Safety Element policies by the City focused on increasing wildfire safety through increased coordination with fire protection agencies, using the latest mapping to determine wildfire risks, and supporting efforts to evaluate wildfire evacuation and safety planning. The 2021 FEIR determined that development of the Housing Sites, especially within or adjacent to VHFHSZ, could result in impacts related to wildfire. However, future ministerial and discretionary development at the Housing Sites would be required to adhere to all regulatory requirements in place to minimize wildfire hazards including applicable sections of the SCMC, fire and building codes, and requirements from the fire chief that would be identified during future building permit reviews. Additionally, implementation of General Plan Policies S-3.02 through S-3.06 in the City’s General Plan Safety Element would further protect land uses within the VHFHSZ and enhance wildfire safety. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not expose people or structures either directly or indirectly to a significant risk of loss, injury, or death involving wildland fires, and impacts would be less than significant.

Project
The project site is located in an urbanized area and is not within, or adjacent to, an area identified as a VHFHSZ. Therefore, the project would not result in new impact or substantially increase the severity of an impact related to exposure of people or structures to a significant risk of loss, injury, or death involving wildland fires compared to what was previously analyzed in the 2021 FEIR.

Infrastructure
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could result in fire risk. The 2021 FEIR determined that future ministerial and discretionary development at Housing Sites and associated infrastructure would be required to adhere to all regulatory requirements in place to minimize wildfire hazards including applicable sections of the SCMC, fire and building codes, and requirements from the fire chief that would be identified during future building permit reviews. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment, and impacts would be less than significant.

ATTACHMENT 31
395
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 68 ends

Project
As described in Section 15.19.a above, existing utility services are available adjacent to the site, and improvements would be limited to extension of pipelines onto the project site. Furthermore, the project would not increase demand for utility services beyond what was analyzed in the 2021 FEIR.

Consequently, the project would not project would not construct any infrastructure facilities.

Therefore, the project would not require the installation or maintenance of associated infrastructure that may a new or substantially greater fire risk than previously analyzed, and impacts would be less than significant. No new impact would occur.

Flooding and Landslides
2021 FEIR
The 2021 FEIR determined that the Safety Element Update is a policy document that would not result in any physical development that could result in fire risk. The 2021 FEIR determined that development of future Housing Sites would be required to comply with applicable regulations and policies related to flooding, drainage patterns, and landslides. Therefore, the 2021 FEIR determined that the Housing and Safety Elements Update would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes, and impacts would be less than significant.

Project
Review of Figure 4.8-2 of the 2021 FEIR determined that the project site is not located within a flood hazard zone. As described in Section 4.7. above, the Geologic and Seismic Hazards Review completed for the project determined that the majority of the project site is flat and would not be subject to landslides. Implementation of measures identified in the Geologic and Seismic Hazards Review would ensure protection against landslides. Therefore, the project would not expose people or structures to a new impact or a substantial increase in the severity of impacts related to downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage compared to what was previously analyzed in the 2021 FEIR.

16.0 Mitigation Monitoring and Reporting Program Incorporated into the project The project shall be required to comply with the applicable mitigation measures outlined within the MMRP of the previously certified PEIR, including measures incorporated by reference from the City’s General Plan Mitigation Monitoring Program, and those identified with the project-specific subsequent technical studies. The following MMRP presented in Table 18 below identifies measures that specifically apply to this project.

ATTACHMENT 31
396
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 69 ends

Table 18
Mitigation, Monitoring, and Reporting Program Incorporated into the Project Mitigation Measure
Timing of
Verification
Responsible for
Verification
Status/
Date/
Initials
Biological Resources
MM -BIO-1: Nesting Migratory Birds
No direct impacts shall occur to any nesting birds, their eggs, chicks, or nests during the breeding season. If vegetation removal activities must occur during the bird breeding season of February 1 to September 15, then a pre-construction survey would be necessary to confirm the presence or absence of breeding birds within the temporary parking lot.

If nests or breeding activities are located on-site, then an appropriate buffer area around the nesting site shall be maintained until the young have fledged. The width of the buffer would be determined by a qualified biologist and biological monitoring would be required during construction. If no nesting birds are detected during the pre­construction survey, no avoidance measures would be required.

During
Construction
City of San
Clemente/
Qualified
Biologist
Cultural Resources
MM-CUL-1: Archaeological Monitoring
A qualified archaeologist shall be retained for the project to conduct the following monitoring activities during construction:
a. An archaeologist shall be on call during grading and other significant ground-disturbing activities.
b. Should any cultural/scientific resources be discovered, no further grading shall occur in the area of the discovery until the Community Development Director concurs in writing that
adequate provisions are in place to protect these resources. c. Unanticipated discoveries shall be evaluated for significance by an Orange County Certified Professional Archaeologist. If significance criteria are met, then the project shall be required to perform data recovery, professional identification,
radiocarbon dates as applicable, and other special studies; submit materials to the California State University Fullerton or local archival facility, where available; and provide a comprehensive final report including appropriate records for the California Department of Parks and Recreation (Building, Structure, and Object Record; Archaeological Site Record; or District Record, as applicable).

During
Construction
City of San
Clemente/
Qualified
Archaeologist
ATTACHMENT 31
397
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 70 ends

Table 18
Mitigation, Monitoring, and Reporting Program Incorporated into the Project Mitigation Measure
Timing of
Verification
Responsible for
Verification
Status/
Date/
Initials
Geology and Soils
MM-PAL-1: Paleontological Resources Impact Mitigation Program A paleontologist who meets the qualifications established by the Society of Vertebrate Paleontology (SVP) shall be retained to develop a Paleontological Resources Impact Mitigation Program (PRIMP) for this project. The PRIMP shall be consistent with the standards of the SVP and include the methods that will be used to protect paleontological resources that may exist within the project site, as well as procedures for monitoring, fossil preparation and identification, curation into a repository, and preparation of a report at the conclusion of grading.

Prior to and
during
Construction
City of San
Clemente/
Qualified
Paleontologist
MM-PAL-2: Paleontological Monitoring
Excavation and grading activities in deposits with high paleontological sensitivity (i.e., the Capistrano Formation) shall be monitored by a qualified paleontological monitor following a PRIMP. No monitoring is required for excavations in deposits with no paleontological sensitivity (i.e., Artificial Fill). If paleontological resources are encountered during the course of ground disturbance, the paleontological monitor shall have the authority to temporarily redirect construction away from the area of the find. In the event that paleontological resources are encountered when a paleontological monitor is not present, work in the immediate area of the find shall be redirected, and the paleontologist or paleontological monitor shall be contacted to assess the find for scientific significance. If determined to be scientifically significant, the fossil shall be collected from the field.

During
Construction
City of San
Clemente/
Qualified
Paleontologist
MM-PAL-3: Paleontological Resources Report
Collected resources shall be prepared to the point of identification, identified to the lowest taxonomic level possible, cataloged, and curated into the permanent collections of a museum repository. At the conclusion of the monitoring program, a report of findings shall be prepared to document the results of the monitoring program.

During
Construction
City of San
Clemente/
Qualified
Paleontologist

ATTACHMENT 31
398
Addendum to 2021 FEIR for the Housing and Safety Element Updates San Clemente Senior Housing & Medical Office Project

Page 71 ends

17.0 Checklist References
California Geological Survey (CGS)
2008 Special Publication 117A, Guidelines for Evaluating and Mitigating Seismic Hazards in California; originally adopted March 13, 1997 by the State Mining and Geology Board in Accordance with the Seismic Hazards Mapping Act of 1990, Revised and Re-Adopted September 11, 2008.

State of California Department of Conservation
2016 California Important Farmland Finder. https://maps.conservation.ca.gov/dlrp/ciff/ California Public Utilities Commission (CPUC)
2021 Renewables Portfolio Standard Annual Report, November 2021.

ATTACHMENT 31
399

SAN CLEMENTE

SENIOR HOUSING

ENTITLEMENT SET
AUGUST 31, 2022
ATTACHMENT 12
400
G-1.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CA TCA # 2021-055

PROJECT TEAM
DEVELOPER:

ARCHITECT:

CIVIL ENGINEER:

LANDSCAPE ARCHITECT:

FIRE:

INDEX
GENERAL:

ARCHITECTURE:

CIVIL:

LANDSCAPE:

FIRE:

PROJECT DESCRIPTION
The San Clemente Senior Housing Project is a proposed mixed-use redevelopment of 654 Camino del los Mares (APN 675-072-19) in the City of San Clemente for the development of a 250-unit senior housing project and a 7,500 square foot medical office building.Specifically, the 6.6-acre project site is located on the south side of Camino del los Mares, approximately 545 feet west of the Marbella intersection. The proposed mixed-use redevelopment will consist of the demolition of the vacant building on-site for development of 250 dwelling units (for-rent with age restriction/senior housing) and a 7,500 gross square foot medical office building, as well as the associated infrastructure and common area improvements for both project components, including surface parking and amenity areas. The proposed mixed-use development will be compatible with the surrounding development along Camino del los Mares (existing senior housing, medical office buildings and commercial centers) in both its architectural style and building massing. The San Clemente Senior Housing Project will add value to the community by providing greatly needed, high-quality for-rent senior housing in San Clemente, as prescribed for the project site by the recent City of San Clemente General Plan 2021-2029 Housing Element update, approved by City Council on October 5, 2021.

VICINITY MAP

PROJECT SUMMARY

CALLE CAMPANA CALLE CANASTA

PROJECT INDEX & SUMMARY
Ks
Z
 hEKs
Z
 Ks
Z
 hEKs
Z

^ƚƵĚŝŽ ϲϭ ϲϭKŶĞďĞĚƌŽŽŵ ϭϮϬ ϭϮϬdǁŽďĞĚƌŽŽŵ ϲϴ ϲϴ^ĞŶŝŽƌƉĂƌƚŵĞŶƚƐDĂŶĂŐĞƌhŶŝƚ Ϯ Ϯ'ƵĞƐƚWĂƌŬŝŶŐ ϱϬ ϮϯΎ dKd> Ϯϰϵ ϱϮ Ϯϰϵ ϮϱΎ^ŚĂƌĞĚWĂƌŬŝŶŐͲ'ƵĞƐƚ^ƉĂĐĞƐĨŽƌ^ĞŶŝŽƌƉĂƌƚŵĞŶƚƐΘ,ĞĂůƚŚĞŶƚĞƌ;ϲϭ^ƉĂĐĞƐͿWZ</E' ^W ^Z
Yh/Z
 ^W
^WZKs/

WZ</E';>h>d

,h^
t/d,/Eh/>/E'^
WZd
>zͿdzW
K&h^
Z
Yh/Z
 WZKs/
,ĞĂůƚŚĞŶƚĞƌ ϯϴ ϯϴΎdKd> ϯϴ ϯϴΎΎ^ŚĂƌĞĚWĂƌŬŝŶŐͲ'ƵĞƐƚ^ƉĂĐĞƐĨŽƌ^ĞŶŝŽƌƉĂƌƚŵĞŶƚƐΘ,ĞĂůƚŚĞŶƚĞƌ;ϲϭ^ƉĂĐĞƐͿ WZ</E'Zd/K
ϭƐƉĂĐĞƉĞƌϮϬϬ^&
^/d
/E&KZDd/KE
d
Edd/s
WZ
>DWη^^
^^KZWZ
>η ϲϳϱͲϬϳϮͲϭϵZ
^^dKd>hE/d^Ks
Z>>WZK:
d^/d
Z
 ϲ͘ϲϯ Ϯϴϴ͕ϳϵϱ^&Ks
Z>>WZK:
d
E^/dzKs
Z>>WZK:
d&>KKZZ
Zd/K Ϭ͘ϴϱKs
Z>>WZK:
d>E^W
Ks
Z'
ϭ͘ϲϰ ϳϭ͕ϱϰϵ^&^
E/KZZ
^/
Ed/>WZ
> ϲ͘ϭϲ Ϯϲϴ͕ϰϬϴ^&^
E/KZWZ
>
E^/dz^
E/KZWZ
>&>KKZZ
Zd/K Ϭ͘ϴϵ^
E/KZWZ
>>E^W
Ks
Z'
ϭ͘ϱϯ ϲϲ͕ϱϬϭ^&,
>d,
Ed
ZWZ
> Ϭ͘ϰϳ ϮϬ͕ϯϴϳ^&
,
>d,
Ed
ZWZ
>&>KKZZ
Zd/K Ϭ͘ϯϳ,
>d,
Ed
ZWZ
>>E^W
Ks
Z'
Ϭ͘ϭϮ ϱ͕Ϭϰϴ^&
hE/d^hDDZz
ǀĞƌĂŐĞ dŽƚĂůη dŽƚĂů
hE/ddzW
^&Ύ hŶŝƚƐ hŶŝƚDŝdž EĞƚZĞŶƚ͘
^ƚƵĚŝŽ͗
^ϭ ϱϬϳ ϭ ϱϬϳ^&
^Ϯ ϱϭϮ ϱϴ Ϯϵ͕ϲϵϲ^&
^ϯ ϱϰϲ ϯ ϭ͕ϲϯϴ^&
^ƵďƚŽƚĂů ϲϮ Ϯϱй ϯϭ͕ϴϰϭ^&ϭĞĚƌŽŽŵ͗
ϭ ϲϱϬ ϱ ϯ͕ϮϱϬ^&
Ϯ ϲϳϱ ϲ ϰ͕ϬϱϬ^&
ϯ ϳϮϰ ϲϴ ϰϵ͕ϮϯϮ^&
ϰ ϳϰϭ Ϯϯ ϭϳ͕Ϭϰϯ^&
ϱ ϴϭϯ ϳ ϱ͕ϲϵϭ^&
ϲ ϴϮϬ ϳ ϱ͕ϳϰϬ^&
ϳ ϴϮϳ ϰ ϯ͕ϯϬϴ^&
^ƵďƚŽƚĂů ϭϮϬ ϰϴй ϴϴ͕ϯϭϰ^&ϮĞĚƌŽŽŵƐ͗
ϭ ϵϴϱ ϵ ϴ͕ϴϲϱ^&Ϯ ϵϵϳ ϭϰ ϭϯ͕ϵϱϴ^&ϯ ϭ͕Ϭϲϯ ϱ ϱ͕ϯϭϱ^& ϰ ϭ͕ϭϱϲ ϯϲ ϰϭ͕ϲϭϲ^&
ϱ ϭ͕ϭϴϱ ϰ ϰ͕ϳϰϬ^&
^ƵďƚŽƚĂů ϲϴ Ϯϳй ϳϰ͕ϰϵϰ^&
dKd> ϳϳϵ ϮϱϬ ϭϬϬй ϭϵϰ͕ϲϰϵ^&
ϮϱϬ
ϮϬϮϮͲϭϭϲ
ϲϱϰĂŵŝŶŽĚĞůŽƐDĂƌĞƐ͕^ĂŶůĞŵĞŶƚĞ͕͕ϵϮϲϳϯ
ϯϳ͘ϳhͬ
Ύ^ƋƵĂƌĞĨŽŽƚĂŐĞŝƐƚĂŬĞŶĨƌŽŵĐĞŶƚĞƌůŝŶĞŽĨƉĂƌƚŝǁĂůůƐĂŶĚŽƵƚƐŝĚĞŽĨĞdžƚĞƌŝŽƌǁĂůůƐ͕ĞdžĐůƵĚŝŶŐĂůůĚĞĐŬƐĂŶĚďĂůĐŽŶŝĞƐ͘EŽƚĞ͗KŶĞŽĨƚŚĞϲϮƐƚƵĚŝŽƵŶŝƚƐǁŝůůďĞƚŚĞ^ĞŶŝŽƌƉĂƌƚŵĞŶƚƐDĂŶĂŐĞƌhŶŝƚΎΎϱйŽĨƵŶŝƚƐǁŝůůďĞǀĞƌLJůŽǁŝŶĐŽŵĞ;ϭϯhŶŝƚƐͿ ϰϬ͘ϲhͬ
h/>/E'ϭ&>KKZZ
^hDDZz
^ĞŶŝŽƌ,ŽƵƐŝŶŐůĚŐƐ͘ϭ;EĞƚZĞŶƚĂďůĞͿ ϳϲ͕ϴϬϯ^&ŝƌĐƵůĂƚŝŽŶ;ŽƌƌŝĚŽƌƐͬ ůĞǀĂƚŽƌƐͬ^ƚĂŝƌƐͿ ϭϭ͕ϰϱϭ^&ZĞƐŝĚĞŶƚŝĂůŵĞŶŝƚŝĞƐͬ>ŽďďLJ ϲ͕ϴϳϵ^& ^ƚŽƌĂŐĞͬhƚŝůŝƚLJ ϲϵϲ^&>ĞĂƐŝŶŐKĨĨŝĐĞ ϭ͕ϯϯϱ^&
dKd> ϵϳ͕ϭϲϰ^&
h/>/E'Ϯ&>KKZZ
^hDDZz
^ĞŶŝŽƌ,ŽƵƐŝŶŐůĚŐƐ͘Ϯ;EĞƚZĞŶƚĂďůĞͿ ϭϭϳ͕ϴϰϲ^&ŝƌĐƵůĂƚŝŽŶ;ŽƌƌŝĚŽƌƐͬ ůĞǀĂƚŽƌƐͬ^ƚĂŝƌƐͿ Ϯϭ͕ϭϮϲ^&ZĞƐŝĚĞŶƚŝĂůŵĞŶŝƚŝĞƐͬ>ŽďďLJ ϭ͕ϳϯϰ^& ^ƚŽƌĂŐĞͬhƚŝůŝƚLJ ϴϵϲ^&
dKd> ϭϰϭ͕ϲϬϮ^&
ŽŵŵĞƌĐŝĂů
,ĞĂůƚŚĞŶƚĞƌƵŝůĚŝŶŐ ϳ͕ϱϬϬ^&
dKd> ϳ͕ϱϬϬ^&

CAMINO DE LOS MARES

CALLE AGUA
INTERSTATE 5FWY

CAMPANILLA
AVE. VAQUERO

MARBELLA
SITE
Saddleback Memorial Medical Center 24451 Health Center DriveLaguna Hills, CA 92653Attn: Aaron ColeyTCA Architects18821 Bardeen Ave. Irvine, CA 92612Contact: Chris WilliamsHunsenker & Associates3 Hughes, Irvine, CA 92618 Contact: Ted D. FrattoneC2 Collaborative100 Avenida Miramar, San Clemente, CA 92618 Contact: Blaine Shearer Woden106 W. 4th St., Suite 308 Santa Ana, CA 92701 Contact: Joshua Apolenis P: 949.452.3627
[email protected]
P: 949.862.0270P: 949.862.0289
www.tca-arch.com
[email protected]
P: 949.768.2541
C: 949.283.2294
www.hnagi.com
[email protected]
P: 949.366.6624
C: 949.542.7706
www.c2collaborative.com
[email protected]
P: 240.688.0980
www.wodenfire.com
[email protected]
A-1.1A-1.2A-1.3A-2.1A-2.2A-2.3A-2.4A-2.5A-2.6A-2.7A-2.8A-2.9 A-2.10A-3.1A-3.2A-3.3A-3.4A-3.5A-4.1A-5.1A-6.1A-6.2A-6.3 G-1.1C-1C-2C-3C-4C-5C-6C-7C-8C-9L-1L-2L-3L-4L-5L-6L-7L-8FMP-0FMP-1 BUILDING PERSPECTIVE BUILDING PERSPECTIVE BUILDING PERSPECTIVE LEVEL 0 FLOOR PLANLEVEL 1 FLOOR PLANLEVEL 2 FLOOR PLANLEVEL 3 FLOOR PLANLEVEL 4 FLOOR PLANROOF PLANAMENITY PLAN ENLARGEMENTNORTH & EAST ELEVATIONSSOUTH & WEST ELEVATIONS BUILDING SECTIONSHEALTH CENTER PERSPECTIVESHEALTH CENTER SECTIONSCARPORTS TRASH ENCLOSURESOPEN SPACE AND AMENITY PERSPECTIVESMATERIAL BOARDSHADOW STUDYROOF HEIGHT STUDY: SECTIONSROOF HEIGHT STUDY: PLANROOF HEIGHT STUDY: SITE VIEW

PROJECT INDEX & SUMMARY
EXISTING CONDITIONS MAPVESTING TENTATIVE PARCEL MAP No. 2022-116SITE PLANCONCEPTUAL GRADING PLANCUT-FILL MAPSITE SECTIONSPRELIMINARY UTILITIES PLAN DRAINAGE PLAN - EXISTING CONDITIONDRAINAGE PLAN - PROPOSED CONDITIONLANDSCAPE CONCEPT PLANLANDSCAPE ENLARGEMENTSLANDSCAPE ENLARGEMENTSLANDSCAPE DESIGN IMAGERYIRRIGATION PLANOPEN SPACE PLANWALL & FENCE PLANPUBLIC STREETSCAPE IMPROVEMENT PLAN FIRE MASTER PLAN COVER SHEETFIRE ACCESS PLAN ATTACHMENT 12
401
A-1.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

BUILDING PERSPECTIVE

NORTHWEST CORNER - BUILDING ENTRY

CAMINO DE LOS MARES
INTERSTATE 5
ATTACHMENT 12
402
A-1.2 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

BUILDING PERSPECTIVE

NORTH FACADE - BUILDING ENTRY

CAMINO DE LOS MARES
INTERSTATE 5
ATTACHMENT 12
403
A-1.3 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

BUILDING PERSPECTIVE

NORTHEAST - FROM CAMINO DE LOS MARES

CAMINO DE LOS MARES
INTERSTATE 5
ATTACHMENT 12
404
A-2.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 30 00 120 BUILDING PLANS
LEVEL 0
% %
$ $
$$$%
$%
$
$
$
$


$ /2%%<

 

 
 
 



 


 

 
 




























/2%%<
66
66 

LEGEND

UNITSSTAIRS & ELEVATORSSTORAGEAMENITIES
Building 1 Building 1
S U
3 S
Building 2 Building 2 151 S U 151 S U
3 S A 3 S A

CAMINO DE LOS MARES

SAN CLEMENTE VILLAS

SENIOR LIVING
Building 3 Building 3
C B
2 S , ,500 S 2 S , ,500 S
Level 1Level 0 Lev Level 0 el 1
ATTACHMENT 12
405
A-2.2 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 30 00 120 BUILDING PLANS
LEVEL 1
%$$$
$
%
$
$
$
$$$6%
666$6% % %
$ $
% $ $ % 66$
$%
6 6 $ $
$
$ 6 6 $
%
%
$%
$$$%
$%
$
$
$
$
$


7<3


7<3


7<3


/2%%<
$
%
66
%
66
6
LEGEND

UNITSSTAIRS & ELEVATORSSTORAGEAMENITIES
26’-0” TYP.
26’-0”
TYP.
26’-0”
TYP.
24’-0”
26’-0”
TYP.
26’-0”
TYP.
26’-0”
TYP.
24’-0”
25’-0”
8’-6”
TYP.
8’-6”
TYP.
20’-0”
TYP.
8’-6”
TYP.
8’-6”
TYP.
9’-0”
TYP.
10’-0”
TYP.
10’-0”
TYP.
10’-0”
TYP.
18’-0”
TYP.
18’-0”
TYP.
18’-0”
TYP.
18’-0”
TYP.
18’-0”
TYP.
18’-0”
TYP.
18’-0”

LOADING
SUITE
3,900 SF 3,900 SF

OPEN TO OPEN TO
ABOVE
MECH
Building 1 Building 1
S U
3 S
Building 2 Building 2 151 S U 151 S U
3 S A 3 S A

CAMINO DE LOS MARES

SAN CLEMENTE VILLAS

SENIOR LIVING
Building 3 Building 3
C B
2 S , ,500 S 2 S , ,500 S
Amenity, Leasing, and Amenity, Leasing, and
Office Spaces Office Spaces See Sheet A-2.7 See Sheet A-2.7

BREZEAWAY
2 - STORY
VOLUME

BREZEAWAY
Porte Cochere• Parking at Entry
Covered Bike Parking
Architectural Carport• See Sheet A-3.3• No Solar On-Roof Typical Carports
• See Sheet A-3.3• 1:1 Ratio With Units• Solar Included On DesignTypical Carports • See Sheet A-3.3• 1:1 Ratio With Units• Solar Included On Design Architectural Carport• See Sheet A-3.3• No Solar On-Roof Primary Entry• Aligns with Existing Entry to Site
• See Sheet A-3.1 & 3.2
ATTACHMENT 12
406
A-2.3 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 30 00 120 BUILDING PLANS
LEVEL 2
$$$
$$
$
$
$$$6% % % %
$ $
% $ $ % 66$
$%
6 6 $ $
$
$ 6 6 $
%
%
%
$$$%
$%
$
%
$
%
%
$ $ % $
$


7<3


7<3


%
% 6
% %
$
%
66
66
%
666$66
LEGEND

UNITSSTAIRS & ELEVATORSSTORAGEAMENITIES
SUITE
2,100 SF 2,100 SF
SUITE
1,100 SF 1,100 SF
Building 1 Building 1
S U
3 S
Building 2 Building 2 151 S U 151 S U
3 S A 3 S A

CAMINO DE LOS MARES

SAN CLEMENTE VILLAS

SENIOR LIVING
Building 3 Building 3
C B
2 S , ,500 S 2 S , ,500 S
• See Sheet A-3.1 & 3.2
ATTACHMENT 12
407
A-2.4 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 30 00 120 BUILDING PLANS
LEVEL 3
$$$
$$
$
$
$$$6% % % %
$ $
% $ $ % 66$
$%
6 6 $ $
$
$ 6 6 $
%%
$$$%
$%
$
% $
%
$
%
%
$ $ % $
$


7<3


7<3


% 6
% %
%
6
$
66
%
66
666$66
LEGEND

UNITSSTAIRS & ELEVATORSSTORAGEAMENITIES
Building 1 Building 1
S U
3 S
Building 2 Building 2 151 S U 151 S U
3 S A 3 S A

CAMINO DE LOS MARES

SAN CLEMENTE VILLAS

SENIOR LIVING
Building 3 Building 3
C B
2 S , ,500 S 2 S , ,500 S
• See Sheet A-3.1 & 3.2• Parapet Roof - Hide Mechanical Equipment
All building roofs are at 4”/1’-0” slope.

ATTACHMENT 12
408
A-2.5 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 30 00 120 BUILDING PLANS
LEVEL 4
$
$$$6% %
$ $ % $
$
% 6 %
666$66
$
$$$6% %
$ $ % $
$
% 6 %
666$

66
LEGEND

UNITSSTAIRS & ELEVATORSSTORAGEAMENITIES
Building 1 Building 1
S U
3 S
Building 2 Building 2 151 S U 151 S U
3 S A 3 S A

CAMINO DE LOS MARES

SAN CLEMENTE VILLAS

SENIOR LIVING
Building 3 Building 3
C B
2 S , ,500 S 2 S , ,500 S
Roof Over Level 3• Parapet Roof - Hide Mechanical
Equipment
• See Sheet A-6.1 & 6.2 For Roof
Height Study
Roof Over Level 3• Parapet Roof - Hide Mechanical
Equipment
• See Sheet A-6.1 & 6.2 For Roof
• See Sheet A-3.1 & 3.2• Parapet Roof - Hide Mechanical Height Study
Equipment
All building roofs are at 4”/1’-0” slope.

ATTACHMENT 12
409
A-2.6 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 30 00 120 BUILDING PLANS
ROOF
Building 1 Building 1
S U
3 S
Building 2 Building 2 151 S U 151 S U
3 S A 3 S A

CAMINO DE LOS MARES

SAN CLEMENTE VILLAS

SENIOR LIVING
Building 3 Building 3
C B
2 S , ,500 S 2 S , ,500 S
Rooftop Deck
Roof Over Level 3• Parapet Roof - Hide Mechanical
Equipment
• See Sheet A-6.1 & 6.2 For Roof
Height Study
Roof Over Level 4• Parapet Roof - Hide Mechanical
Equipment
• See Sheet A-6.1 & 6.2 For Roof
Height Study
Roof Over Level 3• Parapet Roof - Hide Mechanical
Equipment
• See Sheet A-6.1 & 6.2 For Roof
• See Sheet A-3.1 & 3.2• Parapet Roof - Hide Mechanical Height Study
Equipment
Notes:
• Slope and Roof Heights Shown
on Roof Height Study A-6.2
All building roofs are at 4”/1’-0” slope.

ATTACHMENT 12
410
A-2.7 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 0 1 32 AMENITY PLAN

ENLARGEMENT
$$
$
$
$
$$
66
6
$


7<3
/2










MAIN LOBBY MAIN LOBBY
82’ -10” x 39’ -2” 82’ -10” x 39’ -2”

ELEVATOR ELEVATOR
PASEO

PORTE COCHERE PORTE COCHERE

CLUB ROOM CLUB ROOM
65’- 2” x 36’-5” 65’- 2” x 36’-5”

FITNESS CENTER FITNESS CENTER
35’-6” x 56’ -3” 35’-6” x 56’ -3”

RECREATION AREA / POOL RECREATION AREA / POOL

KITCHEN KITCHEN
28’ -2” x 26’ -5” 28’ -2” x 26’ -5”
LOUNGE
17’ -3” x 26’ -11” 17’ -3” x 26’ -11”

LEASING OFFICE LEASING OFFICE
35’-0” x 22’ -8” 35’-0” x 22’ -8”
ATTACHMENT 12
411
A-2.8 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 1 0 32

1. NORTH ELEVATION FROM CAMINO DE LOS MARES

BUILDING ELEVATIONS

NORTH & EAST

CAMINO DE LOS MARES

SITE KEY PLAN
INTERSTATE 5
1 2

TOP OF ROOF
ELEV. +51’-+6”
LEVEL 3
ELEV. +22’-1”
LEVEL 2
ELEV. +12’-0”

BUILDING HEIGHT
10’-1” 12’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 4
ELEV. +32’-2”
10’-1”
T.O. PLATE.
+43’-3”
10’-1”TOP OF ROOF ELEV. +48’-4”
LEVEL 3
ELEV. +20’-2”
LEVEL 2
ELEV. +10’-1”

BUILDING HEIGHT
10’-1” 10’-1”
LEVEL 0
ELEV. -10’-1”
10’-1”
LEVEL 1
T.O. PLATE
ELEV. +0’-0”
ELEV. +30’-3”
10’-1”

TOP OF ROOF
ELEV. +48’-4”
LEVEL 3
ELEV. +20’-2”
T.O PLATE
ELEV. +30’-3”
LEVEL 2
ELEV. +10’-1” BUILDING HEIGHT
10’-1” 10’-1”
LEVEL 0
ELEV. -10’-1”
10’-1”
LEVEL 1
ELEV. +0’-0”
10’-1”
ELEV. +57’-9” ELEV. +57’-9”
ELEV. +56’-2”
ELEV. +57’-9”
ELEV. +56’-2”ELEV. +57’-9”
ST-1 ST-1
ST-1
ST-1 SF-1
ST-1
R-1
R-1
R-1 OT-1
R-1
W-1
W-1 W-1 OT-1
W-1
W-1
MR-1
MR-1
A-1
A-1
MATERIAL LEGEND 2. EAST ELEVATION FROM SAN CLEMENTE VILLAS PERSPECTIVE VIEW - PASEO PASEO BUILDING 1 PRIMARY ENTRY BUILDING 2
ST-1 STUCCOMR-1 METAL RAILINGW-1 FRAMED WINDOWR-1 CLAY ROOF TILEA-1 AWNING SF-1 STOREFRONTOT-1 ORNAMENTAL WALL TILE ATTACHMENT 12
412
A-2.9 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 1 0 32 BUILDING ELEVATIONS

SOUTH & WEST

CAMINO DE LOS MARES

SITE KEY PLAN
INTERSTATE 5
1 2
LEVEL 2
ELEV. +10’-1”
LEVEL 3
ELEV. +20’-2”

TOP OF ROOF
ELEV. +49’-6”

BUILDING HEIGHT
10’-1” 10’-1”
LEVEL 0
ELEV. -10’-1”
10’-1”
LEVEL 1
ELEV. +0’-0”
LEVEL 4
ELEV. +30’-3”
10’-1”
LEVEL 2
ELEV. +12’-0”
LEVEL 3
ELEV. +22’-1”

TOP OF ROOF
ELEV. +49’-7”

BUILDING HEIGHT
10’-1” 12’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 4
ELEV. +32’-2”
10’-1”
T.O. PLATE.
+42’-3”
10’-1”
LEVEL 2
ELEV. +12’-0”
LEVEL 3
ELEV. +22’-1”

TOP OF ROOF
ELEV. +49’-7”

BUILDING HEIGHT
10’-1” 12’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 4
ELEV. +32’-2”
10’-1”
T.O. PLATE.
+42’-3”
10’-1”
ELEV. +57’-9” ELEV. +57’-9”
ELEV. +56’-2”
ELEV. +56’-2”
OT-1 ST-1 ST-1 R-1 R-1 W-1 W-1 OT-1 MR-1 A-1 SF-1 A-1
ST-1 R-1 R-1 SF-1 OT-1 W-1 ST-1 MR-1 OT-1

1. SOUTH ELEVATION FROM INTERSTATE-52. WEST ELEVATION FROM OCEAN VIEW PLAZA MATERIAL LEGEND PERSPECTIVE VIEW - PRIMARY ENTRY EVA BUILDING 2 BUILDING 1

PRIMARY ENTRY

RECREATION AREA RECREATION AREA

ROOFTOP RECREATION ROOFTOP RECREATION
ST-1 STUCCOMR-1 METAL RAILINGW-1 FRAMED WINDOWR-1 CLAY ROOF TILEA-1 AWNING SF-1 STOREFRONTOT-1 ORNAMENTAL WALL TILE ATTACHMENT 12
413
A-2.10 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 20 00 0

SECTION - C

BUILDING SECTIONS

CAMINO DE LOS MARES

SITE KEY PLAN
INTERSTATE 5

BUILDING HEIGHT
BUILDING HEIGHT BUILDING HEIGHT BUILDING HEIGHT LEVEL 4 ELEV. +22’-1” LEVEL 4 ELEV. +22’-2” LEVEL 3 ELEV. +22’-1” TOP OF ROOF ELEV. +49’-6” TOP OF ROOF ELEV. +51’-6” LEVEL 3 ELEV. +12’-0” LEVEL 3 ELEV. +10’-1” LEVEL 2
ELEV. +12’-0”
10’-1” 12’-0” 10’-1” 10’-1” 10’-1” 10’-1” 12’-0” LEVEL 2 ELEV. +0’-0” LEVEL 2 ELEV. +0’-0” LEVEL 1 ELEV. -10’-1” LEVEL 1 ELEV. +0’-0”
LEVEL 5
ELEV. +32’-2”
T.O. PLATE
ELEV. +32’-3”
LEVEL 4
ELEV. +32’-2”
10’-1” 10’-1” 10’-1”
T.O. PLATE.
+42’-3”
T.O. PLATE.
+42’-3”

TOP OF ROOF
ELEV. +51’-6”
10’-1” 10’-1”
LEVEL 2
ELEV. +10’-1”
LEVEL 3
ELEV. +10’-1”
10’-1” 10’-1”
LEVEL 0
ELEV. -10’-1”
10’-1”
LEVEL 1
T.O. PLATE
ELEV. +0’-0”
ELEV. +30’-3”
10’-1”

TOP OF ROOF
ELEV. +49’-6”
ELEV. +57’-9”
ELEV. +56’-2”
ELEV. +57’-9” ELEV. +57’-9”
ELEV. +56’-2”
A4AA4
4 AA4
4A
S1 B2 S1 B3
A3
S1 B2 S1 B3S1 B2
B4 B4

ROOFTOP DECK ROOFTOP DECK
B4 B4 B4 B4 B4 B4B4 B4 B4 B4 B4 B4B4 B4 B4 B4 B4 B4B4 B4 B4 B4 S1 B3
A2AA2
2 AA2
2A

ROOFTOP DECK ROOFTOP DECK

AMENITIES AMENITIES
C
ABAB
C
BUILDING - 1

RECREATION AREA

EVA PARKING

PARKING

RECREATION AREA

CAMINO DE

LOS MARES

CAMINO DE

LOS MARES

COURTYARD

PARKING

PARKING
PL PL
PL
PL PL
BUILDING - 2

ELEVATOR TOWER

ELEVATOR TOWER

ELEVATOR TOWER

SECTION - ASECTION - BSECTION - C
ATTACHMENT 12
414
A-3.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

HEALTH CENTER BUILDING

PERSPECTIVES

SOUTHEAST PERSPECTIVE - VIEW FROM PARKINGSOUTHWEST PERSPECTIVE- VIEW FROM PARKING PERSPECTIVE VIEW FROM CAMINO DE LOS MARES

EAST - PERSPECTIVE VIEW
ATTACHMENT 12
415
A-3.2 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055 1 0 32 HEALTH CENTER BUILDING

PLANS - ELEVATIONS - SECTIONS
LEVEL 2
ELEV. +13’-0”
T.O. PLATE
ELEV. +26’-0”

TOP OF ROOF
ELEV. +32’-6”

BUILDING HEIGHT
13’-0” 13’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 2
ELEV. +13’-0”
T.O. PLATE
ELEV. +26’-0”

TOP OF ROOF
ELEV. +32’-6”

BUILDING HEIGHT
13’-0” 13’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 2
ELEV. +13’-0”
T.O. PLATE
ELEV. +26’-0”

TOP OF ROOF
ELEV. +32’-6”

BUILDING HEIGHT
13’-0” 13’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 2
ELEV. +13’-0”
T.O. PLATE
ELEV. +26’-0”

TOP OF ROOF
ELEV. +32’-6”

BUILDING HEIGHT
13’-0” 13’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 2
ELEV. +13’-0”
T.O. PLATE
ELEV. +26’-0”

TOP OF ROOF
ELEV. +31’-0”

BUILDING HEIGHT
13’-0” 13’-0” LEVEL 1
ELEV. +0’-0”
LEVEL 2
ELEV. +13’-0”
T.O. PLATE
ELEV. +26’-0”

TOP OF ROOF
ELEV. +31’-0”

BUILDING HEIGHT
13’-0” 13’-0” LEVEL 1
ELEV. +0’-0”
ST-1 ST-1 A-1
A-1
R-1
R-1 R-1
R-1
SF-1 SF-1
W-1
W-1
SUITE
2,100 SF 2,100 SF
SUITE
3,900 SF 3,900 SF

OPEN TO OPEN TO
ABOVE
MECH
SUITE
1,100 SF 1,100 SF
LEVEL - 1 - SCALE 1”-10’LEVEL - 2 - SCALE 1”-10’

NORTH ELEVATION SOUTH ELEVATION

EAST ELEVATIONWEST ELEVATION

SECTION A SECTION B
A A
B
B
MATERIAL LEGENDST-1 STUCCOW-1 FRAMED WINDOWR-1 CLAY ROOF TILEA-1 AWNING SF-1 STOREFRONT • Parapet Roof - Hide Mechanical
Equipment
• Parapet Roof - Hide Mechanical
Equipment
ATTACHMENT 12
416
A-3.3 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

CARPORTS
ST-1 ST-1 R-1 R-1

ARCHITECTURAL CARPORTS - PERSPECTIVE VIEWS TYPICAL OF SOLAR CARPORTS - SINGLE POST CANTILEVER DESIGN ARCHITECTURAL CARPORTS - ELEVATIONS N.T.S.

CLEARANCE
+8’-6”

TOP OF ROOF
ELEV. +12’-0”

CARPORT HEIGHT
13’-0”
ELEV. +0’-0”
MATERIAL LEGENDST-1 STUCCOR-1 CLAY ROOF TILE
ATTACHMENT 12
417
A-3.4 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

TRASH ENCLOSURES
 
 #
 #
 
 #
 

TRASH DUMPSTER

ORGANICS

RECYCLING






ST-1ST-1
ST-1ST-1

LEFT FRONTRIGHT PERSPECTIVE VIEW REAR
FLOOR PLAN 1/4” = 1’-0” MATERIAL LEGEND
ST-1 STUCCO
ATTACHMENT 12
418
A-3.5 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

OPEN SPACE AND AMENITIES

PERSPECTIVES

POOL - RECREATION AREA

POOL AND AMENITY AREAS

ROOFTOP RECREATION AREA

PASEO ENTRYPASEO COURTYARD ALONG CAMINO DE LOS MARES
ATTACHMENT 12
419
A-4.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

MATERIAL BOARD
R-1
A-1
ST-1 W-1 MR-1
SF-1 OT-1

STUCCO - PURE WHITE
SW7005(255-C1) OR SIMILAR

CLASSIC S MISSION CLAY TILE
COLOR: TRADITIONL FLASH OR SIMILAR

METAL AWNING
COLOR: SW9178 IN THE NAVY OR SIMILAR

VINYL WINDOW
COLOR: DARK BRONZE OR SIMILAR

DECORATIVE METAL RAILING

STOREFRTONT
COLOR: DARK BRONZE OR SIMILAR

ORNAMENTAL WALL TILE
COLOR: VARIES
MATERIAL LEGENDST-1 STUCCOMR-1 DECORATIVE METAL RAILINGW-1 FRAMED WINDOWR-1 CLAY ROOF TILE A-1 AWNING SF-1 STOREFRONTOT-1 ORNAMENTAL WALL TILE ATTACHMENT 12
420
A-5.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

SHADOW STUDY
SPRING - MARCH 21, 9AM SPRING - MARCH 21, NOON
SUMMER - JUNE 21, NOON SUMMER - JUNE 21, 3PM
SPRING - MARCH 21, 3PM
SUMMER - JUNE 21, 9AMWINTER - DECEMBER 21, 9AM WINTER - DECEMBER 21, 12 NOON WINTER - DECEMBER 21, 3PM ATTACHMENT 12
421
A-6.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

ROOF HEIGHT STUDY

SECTIONS

FINISHED FLOOR
+217’-6”

FINISHED FLOOR
+228’-0”
+45’-0”
+262’-6”
BUILDING HEIGHT +45’-0” ABOVE GRADE

1. EAST SIDE HEIGHT ANALYSIS
+45’ ABOVE GRADE AT STREET +45’-0”
+273’-0”

FINISHED FLOOR
+45’-0”
+273’-0”
+228’-0”
BUILDING HEIGHT +45’-0” ABOVE GRADE
+45’-0”
+273’-0”
+228’ FINISHED FLOOR+227’ PAD GRADE

PAD GRADE
+227’ -0”

PAD GRADE
+216’ -6”

PAD GRADE
+227’ -0”
A4 S1A4 S1A4 S1A4 S1
A
A

2. WEST SIDE HEIGHT ANALYSIS SECTION A - REPRESENTATIVE BUILDING SECTION • Parapet Roof - Hide Mechanical
Equipment
ATTACHMENT 12
422
A-6.2 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

ROOF HEIGHT STUDY
PLAN
ZŽŽĨ ^ĞŐŵĞŶƚ η ϭ ϯϳ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η Ϯ ϯϳ͘ϱ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η ϯ ϯϴ͘ϭϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϱ͘ϭϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϴ͘ϭϭZŽŽĨ ^ĞŐŵĞŶƚ η ϰ ϯϳ͘ϱ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϱ
ZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η ϱ ϯϱ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϱ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η ϲ ϯϳ͘ϲ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϲZŽŽĨ ^ĞŐŵĞŶƚ η ϳ ϯϴ͘ϲ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϱ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϴ͘ϲZŽŽĨ ^ĞŐŵĞŶƚ η ϴ ϯϲ͘ϱ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϲ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η ϵ ϯϲ͘Ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϲ͘ϮZŽŽĨ ^ĞŐŵĞŶƚ η ϭϬ ϯϵ͘ϰ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϲ͘ϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϵ͘ϰZŽŽĨ ^ĞŐŵĞŶƚ η ϭϭ ϰϬ͘ϰ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϳ͘ϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϬ͘ϰZŽŽĨ ^ĞŐŵĞŶƚ η ϭϮ ϯϵ͘ϰ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϲ͘ϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϵ͘ϰZŽŽĨ ^ĞŐŵĞŶƚ η ϭϯ ϰϴ͘ϳ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϱ͘ϳ
ZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϴ͘ϳZŽŽĨ ^ĞŐŵĞŶƚ η ϭϰ ϰϴ͘ϴ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϱ͘ϴZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϴ͘ϴZŽŽĨ ^ĞŐŵĞŶƚ η ϭϱ ϰϳ͘ϭϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϰ͘ϭϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϭϭZŽŽĨ ^ĞŐŵĞŶƚ η ϭϲ ϰϮ͘ϴ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϵ͘ϴZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϮ͘ϴZŽŽĨ ^ĞŐŵĞŶƚ η ϭϳ ϰϲ͘Ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϯ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϲ͘ϮZŽŽĨ ^ĞŐŵĞŶƚ η ϭϴ ϰϵ͘ϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϲ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϭZŽŽĨ ^ĞŐŵĞŶƚ η ϭϵ ϰϴ͘Ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϱ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϴ͘ϮZŽŽĨ ^ĞŐŵĞŶƚ η ϮϬ ϰϵ͘ϲ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϲ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϲZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϭ ϰϵ͘ϵ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϲ͘ϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϵZŽŽĨ ^ĞŐŵĞŶƚ η ϮϮ ϰϵ͘ϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϲ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϭZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϯ ϰϴ͘Ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϱ͘Ϯ
ZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϴ͘ϮZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϰ ϰϱ͘ϭ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϳϮ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϱ͘ϭZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϱ ϰϵ͘ϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϲ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϭ
ZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϲ ϰϳ͘ϵ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϰ͘ϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϵZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϳ ϰϵ͘ϴ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϲ͘ϴZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϴZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϴ ϰϳ͘Ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϰ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϮZŽŽĨ ^ĞŐŵĞŶƚ η Ϯϵ ϰϵ͘ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϲ͘ϯZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϯZŽŽĨ ^ĞŐŵĞŶƚ η ϯϬ ϱϲ͘Ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϴϯ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϱϲ͘ϮZŽŽĨ ^ĞŐŵĞŶƚ η ϯϭ ϱϭ͘ϵ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϴ͘ϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϱϭ͘ϵZŽŽĨ ^ĞŐŵĞŶƚ η ϯϮ ϭϴ͘ϵ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϰϱ͘ϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϭϴ͘ϵZŽŽĨ ^ĞŐŵĞŶƚ η ϯϯ ϯϰ͘ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϭ͘ϯ
ZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϰ͘ϯZŽŽĨ ^ĞŐŵĞŶƚ η ϯϰ ϰϮ&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϮZŽŽĨ ^ĞŐŵĞŶƚ η ϯϱ ϯϲ͘ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϯZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϲ͘ϯZŽŽĨ ^ĞŐŵĞŶƚ η ϯϲ ϯϰ͘ϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϭ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϰ͘ϭZŽŽĨ ^ĞŐŵĞŶƚ η ϯϳ ϯϱ͘ϭϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϭϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϱ͘ϭϭZŽŽĨ ^ĞŐŵĞŶƚ η ϯϴ ϯϲ͘ϭϭ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϭϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϲ͘ϭϭZŽŽĨ ^ĞŐŵĞŶƚ η ϯϵ ϯϰ͘ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϭ͘ϯZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϰ͘ϯZŽŽĨ ^ĞŐŵĞŶƚ η ϰϬ Ϯϱ͘ϳ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϱϮ͘ϳZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ Ϯϱ͘ϳZŽŽĨ ^ĞŐŵĞŶƚ η ϰϭ ϯϳ͘Ϯ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϮZŽŽĨ ^ĞŐŵĞŶƚ η ϰϮ ϯϱ͘ϱ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϱ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η ϰϯ ϯϳ͘ϵ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϴdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϱ͘ϵ
ZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϵZŽŽĨ ^ĞŐŵĞŶƚ η ϰϰ ϯϱ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϱ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η ϰϱ ϯϴ͘ϰ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϱ͘ϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϴ͘ϰZŽŽĨ ^ĞŐŵĞŶƚ η ϰϲ ϯϱ͘ϱ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϱ͘ϱZŽŽĨ ^ĞŐŵĞŶƚ η ϰϳ ϯϳ͘ϵ &ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϵZŽŽĨ ^ĞŐŵĞŶƚ η ϰϴ ϯϳ &ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϱϯ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳZŽŽĨ ^ĞŐŵĞŶƚ η ϰϵ ϱϳ͘ϵ &ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϰ͘ϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϱϳ͘ϵZŽŽĨ ^ĞŐŵĞŶƚ η ϱϬ ϰϴ͘ϲ &ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϱ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϴ͘ϲ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϭ ϰϰ͘ϵ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϭ͘ϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϰ͘ϵ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϮ ϰϲ͘ϭ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϲ͘ϭ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϯ ϰϰ͘ϵ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϭ͘ϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϰ͘ϵ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϰ ϰϴ͘ϲ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϱ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϴ͘ϲ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϱ ϰϱ͘ϭ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϭ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϱ͘ϭ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϲ ϰϲ͘Ϯ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϳZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϲ͘Ϯ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϳ ϰϳ͘ϭ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϭ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϴ ϰϳ͘ϴ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϯZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϴ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϱϵ ϰϳ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϱ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϬ ϰϵ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϱ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϭ ϰϳ͘ϳ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϳ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϮ ϰϴ͘ϰ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϴ͘ϰ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϯ ϰϳ͘ϳ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϮZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϳ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϰ ϰϵ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϵ͘ϱ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϱ ϰϳ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϰZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϱ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϲ ϰϳ͘ϴ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϯZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϴ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϳ ϰϳ͘ϭ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϭ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϴ ϰϲ͘Ϯ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ ϮϲϮ͘ϳZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϲ͘Ϯ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϲϵ ϰϱ͘ϭ
&ŝŶŝƐŚ &ůŽŽƌ ϬWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϭ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϱ͘ϭ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϳϬ ϰϳ͘ϴ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϯZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϳ͘ϴ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϳϭ ϰϲ͘ϲ
&ŝŶŝƐŚ &ůŽŽƌ Ϯϭϳ͘ϱWĂĚ ĞůĞǀĂƚŝŽŶ Ϯϭϲ͘ϱdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϭZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϲ͘ϲ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϳϮ ϱϳ͘ϵ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϴϰ͘ϵZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϱϳ͘ϵ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϳϯ ϯϴ͘ϲ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϱ͘ϲZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϴ͘ϲ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϳϰ ϯϲ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϯ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϲ͘ϱ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϳϱ ϯϳ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϲϰ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϯϳ͘ϱ
ZŽŽĨ ^ĞŐŵĞŶƚ η ϳϲ ϰϰ͘ϱ
&ŝŶŝƐŚ &ůŽŽƌ ϮϮϴ
WĂĚ ĞůĞǀĂƚŝŽŶ ϮϮϳdŽƉ KĨ ZŽŽĨ
ůĞǀĂƚŝŽŶ Ϯϳϭ͘ϱZŽŽĨ ŵĂdžŝŵƵŵ ŚĞŝŐŚƚ ϰϰ͘ϱ
01 37’-5”
02 37’-5”
03 38’-11” 38’-11”
04 37’-5”
05 35’-5”
06 37’-6”
07 38’-6” 08 36’-5”
09 36’-2”
10 39’-4”
11 40’-4”
12 39’-4”
13 48’-7”
14 48’-8”
15 47’-11” 47’-11”
16 42’-8” 17 46’-2”
18 49’-10” 49’-10”
19 48’-2”
20 49’-6”
21 49’-9”
22 49’-1”
23 48’-2”
25 49’-10” 49’-10”
24 45’-1”
26 47’-10v” 47’-10v”
27 49’-8”
27 49’-8” 28 47’-2”
29 49’-3”
30 56’-2”
31 51’-9”
32 18’-9”
33 34’-3”
34 42’-0” 35 36’-3”
36 34’-1”
37 35’-11” 35’-11”
38 36’-11” 36’-11”
39 34’-3”
40 25’-7”
41 37’-2”
42 35’-5”
43 37’-9”
44 35’-5”
45 38’-4”
46 35’-5” 47 37’-9”
48 37’-0”
49 57’-9” 50 48’-6”
51 44’-9”
52 46’-1”
53 44’-9”
54 48’-6”
55 45’-1”
56 46’-2” 57 47’-1”
58 47’-8”
59 47’-5”
60 49’-5”61 47’-7”
62 48’-4” 63 47’-7”
64 49’-5”
65 47’-5”
66 47’-8” 67 47’-1”
68 46’-2”
69 45’-1”
70 47’-8”
72 57’-9”
71 46’-6”
73 38’-6”
74 36’-5”
75 37’-5”
76 44’-5”
ALL ROOFS ARE AT 4”/ 1’-0” SLOPEROOF HEIGHT PER CITY ANALYSIS METHOD- ROOF SEGMENT HEIGHTSMAXIMUM HEIGHT OF ROOF SEGMENT INDICATES HEIGHT RELATIVE TO FINISHED FLOOR OF GRADE LEVEL FOR ALL PORTIONS OF AREA UNDER ROOF SEGMENT. FINISHED FLOORELEVATIONS ARE CALCULATED PER MASS GRADED SITE ELEVATIONS.

ROOF REFERENCE PLAN

HEIGHT ANALYSIS TABLE
ROOF SEGMENT #

RIDGE HEIGHT OF ROOF SECTION
INDICATES ROOF SECTION IS ENTIRELY UNDER 45’ ABOVE GRADE INDICATES PORTION OR ALL OF ROOF EXCEEDS 45’ ABOVE GRADEINDICATES ROOF SLOPE DIRECTION Roof height per segment considers mass regrading of site. Elevations of pad isconsistant at all points below roof segment, and expressed in table as pad elevation.

ATTACHMENT 12
423
A-7.1 ENTITLEMENT SET
AUGUST 31, 2022

SADDLEBACK MEMORIAL MEDICAL CENTER
SAN CLEMENTE SENIOR HOUSINGSAN CLEMENTE, CATCA # 2021-055

ROOF HEIGHT STUDY

SITE VIEW

NEW CONDITION VIEW IS TAKEN FROM THE INDICATED BUILDING SHOWN IN KEY MAP 5 FREE 5 FREEWAY

CAMPANILLA

CAMINO DE LOS MARES
ELEV. +303’-0”APROX.

SECTION PROFILE

KEY MAP
ATTACHMENT 12
424
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
1 CONDITIONS MAP

EXISTING
ATTACHMENT 12
425
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
2 VESTING TENTATIVE PARCEL
MAP NO. 2022-116
ATTACHMENT 12
426
EV EV
EV
EV EV

EV EV EV EV EV EV EV EV EV
EV

EV EV EV EV EV

EV EV EV EV

EV EV EV
EV

EV EV EV EV MP
MP
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
3 SITE PLAN
EVMP Provided Parking
Type of Parking Number of Parking Spaces
Senior Residential (Covered) 249Senior Apartments Manager Unit (Uncovered) 2Senior Residential Guest Spaces (Uncovered/Shared Parking) 23Health Center (Uncovered/Shared Parking) 38 Total Parking Spaces Provided 312 spaces
Notes:1. EV Parking Spaces Provided 32 spaces / 10.3% - (28 Senior Spaces & 4 Health Center)2. ADA Parking Spaces Provided – 9 spaces / 2.9% - (3 Senior Guest Spaces & 6 Health Center)

WEST ENTRY DETAIL

SENIOR APARTMENTS - UNIT SUMMARY
Average Total # Total
UNIT TYPE SF* Units Unit Mix Net Rent.

Studio:

S1 507 1 507 SFS2 512 58 29,696 SFS3 546 3 1,638 SF
Subtotal 62 25% 31,841 SF1 Bedroom:

A1 650 5 3,250 SF
A2 675 6 4,050 SF
A3 724 68 49,232 SFA4 741 23 17,043 SFA5 813 7 5,691 SF A6 820 7 5,740 SF
A7 827 4 3,308 SF
Subtotal 120 48% 88,314 SF2 Bedrooms:

B1 985 9 8,865 SF
B2 997 14 13,958 SF
B3 1,063 5 5,315 SFB4 1,156 36 41,616 SFB5 1,185 4 4,740 SF Subtotal 68 27% 74,494 SF
TOTAL 779 250 100% 194,649 SF
* Square footage is taken from centerline of parti walls and outside of exterior walls , excluding all decks andbalconies . Note: One of the 62 s tudio units will be the Senior Apartments Manager Unit** 5% of units will be very low income (13 units) ATTACHMENT 12
427
EV EV
EV
EV EV

EV EV EV EV EV EV EV EV EV
EV

EV EV EV EV EV

EV EV EV EV

EV EV EV
EV

EV EV EV EV MP
MP
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
4 GRADING PLAN

CONCEPTUAL
ATTACHMENT 12
428
EV EV
EV
EV EV

EV EV EV EV EV EV EV EV EV
EV

EV EV EV EV EV

EV EV EV EV

EV EV EV
EV

EV EV EV EV
EV EV
MP
MP
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
5 CUT-FILL MAP
Estimated Earthwork Quantities:

Notes:

RAW VOLUME

CUT FILL
14,252 CYS 7,363 CYS
Net Volume 10,779 CYS
EXPORT
OVER-EXCAVATION 57,500 CYS 57,500 CYSSHRINKAGE (6%) 0 CYS (3,890) CYS Total 60,973 CYS 71,752 CYS
A

1. Over-excavation assumes 6' depth from existing finish grade.2. Graded area is approximately 5.93 acres.

TTACHMENT 12
429
EV EV
EV
EV EV

EV EV EV EV EV EV EV EV EV
EV

EV EV EV EV EV

EV EV EV EV

EV EV EV
EV

EV EV EV EV
EV EV
MP
MP
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
6 SITE SECTIONS
ATTACHMENT 12
430
EV EV
EV
EV EV

EV EV EV EV EV EV EV EV EV
EV

EV EV EV EV EV

EV EV EV EV

EV EV EV
EV

EV EV EV EV MP
MP
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
7 UTILITIES PLAN

PRELIMINARY
ATTACHMENT 12
431
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
8 DRAINAGE PLAN

EXISTING CONDITION
ATTACHMENT 12
432
CSAN CLEMENTE
City of San Clemente

SENIOR HOUSING AND HEALTH CENTER
9 DRAINAGE PLAN

PROPOSED CONDITION
ATTACHMENT 12
433
5 6
1 3
11 11 2
2 7
8 4
10 9

CAMINO DE LOS MARES

H E A L T H

CENTE R
LEGEND
Enhanced Paving at Project Entry & Porte CochereEntry Monument WallsExisting Undisturbed Landscape To RemainPedestrian Paseo (Refer to Enlargement on Sheet L-2) Pool Area (Refer to Enlargement on Sheet L-2)North Courtyard (Refer to Enlargement on Sheet L-3) South Courtyard (Refer to Enlargement on Sheet L-3)Rooftop Deck Above (Refer to Enlargement on Sheet L-3) Existing Median Modifications per Civil EngineerPublic Streetscape Improvements (Refer to Sheet L-8)Utility Screening (Refer to Enlargement on Sheet L-4) 5 9
34 6 10
11 2
78 1
TREES

REQUIRED TREES

SHRUBS / GROUNDCOVERVINES / ESPALIERS
PROPOSED PLANTING LISTBotanical Name / Common Name (WUCOLS) QTY. 1134181251041017412360209 Total
(WUCOLS)(WUCOLS) Botanical Name / Common Name
Parcel 1
Landscape Coverage Required (1 per 300 sf) Provided
46,963 sf * 157 192
Parcel 2Total
5,048 sf 52,011 sf
17174
17209
Botanical Name / Common Name
Bougainvillea ‘Purple Queen’/Purple Queen Bougainvillea (L)Distictis ‘Rivers’/Royal Trumpet Vine (M) * Excludes existing landscaped slope which is to be preserved (19,538 sf).

NOTE: 1. WUCOLS Region 3 (South Coastal)2. All trees to be installed at 24” box minimum.3. California native species shall be planted in at least 60% of required landscape areas.

Adenostoma f. ‘Nicolas’/Nicolas Chemise (VL) *Agave attenuate/Fox Tail Agave (L)Agave geminiflora/Twin Flowered Agave (L)Agave t. ‘Azul’/Weber’s Blue Tequila Agave (L)Aloe ‘Blue Elf’/Blue Elf Aloe (L)Aloe v. ‘Barbadensis’/Medicinal Aloe (L)Arctostaphylos ‘Pacific Mist’/Pacific Mist Manzanita (L)*Arctostaphylos x d. ‘Howard McMinn’/Manzanita (L) *Arctostophylos glauca/Big Berry Manzanita (VL) *Bougainvillea ‘Rosenka’/Rosenka Bougainvillea (L)Carissa m. ‘Green Carpet’/Green Carpet Natal Plum (L)Collinsia heterophylla/Chinese House (U) *Cornus sericea/Creek Dogwood (H) *Epilobium c. ‘Catalina’/California Fuchsia (VL) *Eriogonum p. ‘Red Form/Cliff Buckwheat Red (VL) *Frangula californica/California Buckthorn (VL) *Furcraea macdougalii/MacDougall’s Century Plant (L)Galvezia s. ‘Firecracker’/Firecracker Snapdragon (U) *Iris douglasiana/California Iris (L) *Leymus c ‘Canyon Prince’/Canyon Prince Wild Rye (U) Ligustrum j. ‘Texanum’/Texas Privet (M)Liriope gigantea/Giant Lilyturf (M)Lupinus albifrons/Silver Lupine (L) *Malacothamnus fasciculatus/Chaparral Mallow (VL) *Mimulus aurantiacus/Sticky Monkey Flower (VL) *Mimulus ‘Jelly Bean Orange’/Monkey Flower (L)*Muhlenbergia rigens/Deer Grass (L) *Nandina d. Alba ‘Lemon-Lime’/Lemon Lime Nandina (L)Philodendron Xanadu/Cut-leaf Philodendron (M)Pittosporum t. ‘Variegata’/Variegated Mock Orange (M)Rhaphiolepis i. ‘Clara’/Clara Indian Hawthorn (L)Rhaphiolepis u. ‘Southern Moon’/Southern Moon Hawthorn (L)Rhus integrifolia/Lemonade Berry (VL)*Ribes indecorum/White Flowering Gooseberry (VL) *Ribes malvaceum/Chaparral Flowering Gooseberry (VL) *Rosmarinus o. ‘Huntington Carpet’/Rosemary (VL)Rosa californica/California Wildrose (L) *Salvia apiana/White Sage (VL) *Salvia ‘Bees Bliss’/Creeping Sage (L) *Salvia g. ‘Dark Dancer’/Dark Dancer Salvia (L) *Salvia mellifera/Black Sage (VL) *Senecio s. ‘Punk Pickle’/Punk Pickle (L)Solanum xanti/Purple Nightshade (VL) *Strelitzia reginae/Bird of Paradise (M)Tradescantia p. ‘Purpurea’/Wandering Jew (M)Westringia ‘Morning Light’/Coast Rosemary (L)* Native Species Arbutus u. ‘Compacta’/Strawberry Tree (L)Cupaniopsis anacardiodes/Carrot Wood (M)Cupressus sempervirens/Italian Cypress (L)Dracaena draco/Dragon Tree (VL)Lagerstroemia i. ‘Muskogee’/Crape Myrtle (M)Magnolia g. ‘D.D. Blanchard’/Southern Magnolia (M)Melaleuca nesophilia/Pink Melaleuca (L)Olea e. ‘Swan Hill’/Swan Hill Fruitless Olive (L)Phoenix d. ‘Medjool’/Medjool Date Palm (L)Pinus halepensis/Aleppo Pine (L)Podocarpus gracilior/Fern Pine (M)Schinus molle/California Pepper Tree (VL)Trachycarpus fortunei/Windmill Palm (M) 1 08.31.22

SAN CLEMENTE, CA
L-1

SAN CLEMENTE SENIOR HOUSING -
Collaborative
0 15’ 30’ 60’
Scale: 1”= 30’-0” LANDSCAPE CONCEPT PLAN
ATTACHMENT 12
434
KEYMAP
A
AB
B
LEGEND
Paseo Entry Plaza per ArchitectGated Entry at Resident PaseoOverhead Trellis and SeatingWater Feature at PaseoBenches at PaseoOverhead Trellis with BBQ Counter and Dining AreaPool Enclosure FenceSpa - 10’ x 12’ (120 SF)Pool with Walk-In Entry - 75’ x 41’ (2,172 SF)Pool Restroom Building with ShowersOverhead Trellis with Chaise LoungesFire Pit and Soft SeatingStairs to EVATerrace Planter at EVAPool Equipment Room AccessEmergency Vehicle Access Bicycle Storage / Parking 123456789
1011121314151617
16 1
2 1015111417
35 4
6879
13 12
12 MATCH LINE- SEE TOP RIGHT

MATCH LINE- SEE BOTTOM LEFT
MW

CAMINO DE LOS MARES

08.31.22 SAN CLEMENTE, CA
L-2

SAN CLEMENTE SENIOR HOUSING -
Collaborative
0 5’ 10’ 20’
Scale: 1”= 10’-0”

PASEO ENLARGEMENT POOL AREA ENLARGEMENT

LANDSCAPE ENLARGEMENTS
ATTACHMENT 12
435
KEYMAP
C
F
E
D
C
DG
EF

NORTH COURTYARD ENLARGEMENT

SOUTH COURTYARD ENLARGEMENT

ROOFTOP DECK ENLARGEMENTUTILITY SCREENING ENLARGEMENTGENERAL PARKING SCREENING ENLARGEMENT LEGEND
Overhead Trellis with SeatingParterre Garden with Decorative Planter PotTable and ChairsWater FeatureTwo Sided Fireplace with Soft SeatingCourtyard Entry Portal Synthetic Lawn PanelsLightweight PlanterBBQ CounterFire TableDining TablePlanter PotSoft SeatingElevator Access6’ Height Combo Stucco Wall and Glass Safety and Sound Barrier Public SidewalkDouble Detector Check Per CivilLow GroundcoverEvergreen Screening HedgeBackflow Device And Water Meter Per CivilEvergreen Screening Hedge 123456789
101112131415
1 3 2 9 8
8 1412
8 9 13 11 15
4567

CAMINO DE LOS MARES

CAMINO DE LOS MARES

08.31.22 SAN CLEMENTE, CA
L-3

SAN CLEMENTE SENIOR HOUSING -
Collaborative

LANDSCAPE ENLARGEMENTS
0 5’ 10’ 20’
Scale: 1”= 10’-0”
ATTACHMENT 12
436

08.31.22 SAN CLEMENTE, CA
L-4

SAN CLEMENTE SENIOR HOUSING -
Collaborative

LANDSCAPE DESIGN IMAGERY
ATTACHMENT 12
437
LEGEND

IRRIGATION DATA
Planting AreaPool / Spa / Water Feature
Irrigation Strategy:Irrigation Control and Point of Connection:The irrigation will be controlled by a weather based controller capable of receiving real timeweather and/or evapotranspiration data that will automatically adjust its station run timesbased on that data. The controller will also incorporate a rain sensing device to shut off thesystems in the event of significant rainfall. The controller will interface with a master valve andflow sensor located at the irrigation point of connection. These two devices enable thecontroller to log expected flows throughout the system and shut down individual valve stationsin the event of a line break, as well as monitor the pressure supply piping for leaks and breaks.In that event, the master valve will shut down to prevent water loss and erosion damage.Irrigation Delivery Systems:Shrub and Ground Cover Plantings:Shrub and Ground Cover Plantings will be served by in-line emitter tubing installed in an 18” oncenter triangular gird within the planting beds. Valves will be equipped with a pressureregulator and a basket strainer to ensure the appropriate pressure and protect againstcontamination. Piping within this system consists of schedule 40 PVC headers extending to theemitter tubing.Tree Planting:Tree Plantings will be served by Deep Root Watering systems consisting of bubbler installedwithin heavy mesh tubing designed to efficiently supply water while encouraging deep rooting.Water Conservation:The system will be designed to optimize irrigation water conservation through the use of:
x In Line emitter drip system for Trees, Shrubs and Ground Cover. This type of irrigation has an irrigation efficiency rating of 81%, among the highest of anytype of irrigation type. x Weather Based Control System. Using a weather based controller that automatically adjusts system run times based on current weather and relatedevapotranspiration rates can significantly reduce irrigation water usage. TheCenter for Irrigation Technology has found savings rates up to 20% overconventional manually adjusted controller systems.

Location Plant Factor (PF) Irrigation Method Irrigation Efficiency (IE) ETAF (PF/IE) Landscape Area (sq ft) ETAF x Area Estimated Total Water Use (ETWU) 1 Throughout 0.5 Drip 0.81 0.62 33,070 20413.4 587,253
2 Throughout 0.2 Drip 0.81 0.25 11,023 2721.8 78,300
3 Courtyard/Pool
Area 1.0 None 1.0 1.00 2,335 2335.0 67,173
4 Throughout 0.5 Bubbler 0.77 0.65 1,531 994.3 28,605
5 Throughout 0.3 Bubbler 0.77 0.39 1,519 591.7 17,023
6789
1011
Weighted
Average
Total Total

0.54 49,478 27,056 778,354
Average ETAF for Regular In Not InLandscape Areas (circle one): Compliance Compliance SLA-1SLA-2SLA-3SLA-4SLA-5
Totals
49,478
778,354782,861
Site Wide ETAF
ETWU Total
Maximum Allowed Water Allownance (MAWA)
none
Special Landscape Area
Hydrozone #/
Planting
Description
Moderate
Water Use
Shrubs
Total Landscape Area
Regular Landscape Area
Low Water
Use Shrubs
Water
Features
Moderate
Trees
Low Trees
x dŚĞ ƵƐĞ ŽĨ Ă ƌĂŝŶ ƐŚƵƚ ŽĨĨ ĚĞǀŝĐĞ ǁŝůů ĞůŝŵŝŶĂƚĞ ŝƌƌŝŐĂƚŝŽŶ ĚƵƌŝŶŐ ƉĞƌŝŽĚƐ ŽĨ ƐŝŐŶŝĨŝĐĂŶƚ ƌĂŝŶĨĂůů͘ dŚĞƐĞ ĚĞǀŝĐĞƐ ĂŶĚ ďĞ ƐĞƚ ƚŽ ĚĞƚĞĐƚ ƌĂŝŶĨĂůů ŝŶ ŝŶĐƌĞŵĞŶƚƐ ŽĨϭͬϴ͕͟ ĂŶĚ ƐŝŵƵůĂƚĞ ƐŽŝů ŵŽŝƐƚƵƌĞ ĚĞĐůŝŶŝŶŐ ĂĨƚĞƌ Ă ƌĂŝŶĨĂůů ĞǀĞŶƚ͕ ƚŚĞƌĞďLJ ŬĞĞƉŝŶŐƚŚĞ ƐLJƐƚĞŵ ŽĨĨ ĨŽƌ ǀĂƌLJŝŶŐ ůĞŶŐƚŚƐ ŽĨ ƚŝŵĞ ĚĞƉĞŶĚŝŶŐ ŽŶ ƚŚĞ ĚƵƌĂƚŝŽŶ ĂŶĚƋƵĂŶƚŝƚLJ ŽĨ ƌĂŝŶ͘ ^ĂǀŝŶŐƐ ǁŝůů ǀĂƌLJ ĚĞƉĞŶĚŝŶŐ ŽŶ ƚŚĞ LJĞĂƌ ƌĂŝŶĨĂůů͘ x DĂƐƚĞƌ sĂůǀĞ ĂŶĚ &ůŽǁ ^ĞŶƐŽƌ͘ dŚĞƐĞ ƚǁŽ ĚĞǀŝĐĞƐ ǁŽƌŬ ŝŶ ĐŽŶĐĞƌƚ ƚŽ ƉƌĞǀĞŶƚ ǁĂƚĞƌ ůŽƐƐ ĨƌŽŵ ƐLJƐƚĞŵ ďƌĞĂŬƐ Žƌ ƐŝŐŶŝĨŝĐĂŶƚ ůĞĂŬƐ͘ /Ŷ ĂĚĚŝƚŝŽŶ͕ ƚŚĞ ĚĂƚĂ ĨƌŽŵ ƚŚĞĨůŽǁ ƐĞŶƐŽƌ ĐĂŶ ďĞ ƵƐĞĚ ƚŽ ƚƌĂĐŬ ŝƌƌŝŐĂƚŝŽŶ ǁĂƚĞƌ ƵƐĂŐĞ͘ ^ŝŐŶŝĨŝĐĂŶƚ ǁĂƚĞƌ ůŽƐƐĂŶĚ ĞƌŽƐŝŽŶ ĚĂŵĂŐĞ ĐĂŶ ďĞ ĞůŝŵŝŶĂƚĞĚ ďLJ ƵƐŝŶŐ ƚŚĞƐĞ ĚĞǀŝĐĞƐ͘

CAMINO DE LOS MARES

HEALT H

CENTE R

08.31.22 SAN CLEMENTE, CA
L-5

SAN CLEMENTE SENIOR HOUSING -
Collaborative

IRRIGATION CONCEPT PLAN
0 15’ 30’ 60’
Scale: 1”= 30’-0”
ATTACHMENT 12
438
LEGEND
Exterior Open Space(Minimum Dimension 15’)Total:Required:(100 sf/DU)Difference:Patios and BalconiesSubstitute Surplus Shared Open SpaceTotal:Required:(100 sf/DU) 35,590 sf35,590 sf25,000 sf+10,590 sf14,610 sf10,590 sf25,200 sf25,000 sf50,000 sf50,200 sf Total Open Space Required: Total Open Space Provided:
35’
15’
15’
15’
15’
25’
15’
20’
27’
27’
35’
19’
88’

R O O F T O P D E C K SITE PLAN

CAMINO DE LOS MARES

POOL AR POOL AREA
PASEO
NORTH

COURTYARD
SOUTH

COURTYARD

HEALT H

CENTE R

SHARED OPEN SPACEPRIVATE OPEN SPACE

08.31.22 SAN CLEMENTE, CA
L-6

SAN CLEMENTE SENIOR HOUSING -
Collaborative

OPEN SPACE PLAN
ATTACHMENT 12
439
LEGEND
Decorative Entry WallMasonry with stucco finish and precast concrete wall cap (4’-0’ height)Paseo Entry Plaza WallsMasonry with Stucco Finish and precast concrete wall cap (Height varies – 5’-0” backdrop walls, 4’-0” and 3’-0” wing walls). Refer to sheet A-1.3 for additional info.Raised Planter WallMasonry with stucco finish and precast concrete wall cap (5’-0” max. height)Walkway Cheek/Retaining WallMasonry with stucco finish and precast concrete wall cap (Height varies – 4’-0” max.)Trash Enclosure WallMasonry with stucco finish (Height 6’-0”). Refer to sheet A-3.4 for additional info.Retaining WallMasonry with stucco finish and precast concrete wall cap (Height varies). Refer to Conceptual Grading Plan Sheet C-4 for additional info.Verdura Retaining Wall(Height varies). Refer to Conceptual Grading Plan on Sheet C-4 for additional info.Existing Property Line Wall at Ocean View PlazaMasonry with stucco finish (Height +/- 6’-0”) Paseo EntryPool EntryWater District Access Gate
53’
30’ 13’ 83’
110’
83’
39’
19’
55’
213’
31’
107’
39’
145’
26’
23’ 12’ 12’ 20’

WALLFENCEGATE
Pool Enclosure FenceCombo masonry with stucco finish and precast concrete cap and glass (Height 6’-0” total)Tubular Steel FencePainted (Height 6’-0”) 340’ (Approx.)

H E A L T H

CENTE R

08.31.22 SAN CLEMENTE, CA
L-7

SAN CLEMENTE SENIOR HOUSING -
Collaborative

WALL AND FENCE PLAN
ATTACHMENT 12
440
1 3
3 11 2
2 5 5
4 4 4
4 LEGEND
Proposed 10’ Wide Concrete Sidewalk per City StandardsPaseo Entry Plaza per Architect • Water Feature• Overhead Trellis at Portal• Built-In Seating Feature Tactile Warning Surface at Driveway Crossing per City StandardExisting Street Light in MedianMedian Modifications per Civil Engineer. Landscape Improvements per City Standards Pedestrian Circulation RouteExisting Podocarpus gracilior / Fern Pine Street TreeAdditional Podocarpus gracilior / Fern Pine Street Tree,,36” BoxPhoenix canariensis/Canary Island Date Palm, 20’ BTH (Median Trees to Match Existing) 12345
A
A
B
B
+/- 45’ TYP
10’
10’
5’
R/W
R/W
R/W
R/W

BLDG WALL

BLDG WALL
R/W
R/W

CAMINO DE LOS MARES
10’ 10’
5’ 5’

STREETSCAPE AND PEDESTRIAN CIRCULATION
1”=20’-0”
PASEO ENTRY PLAZA ENLARGEMENT1” = 10’-0”
STREETSCAPE SECTION B-B1/8” = 1’-0”
STREETSCAPE SECTION A-A1/8” = 1’-0”
HEALTH

C ENTE R

08.31.22 SAN CLEMENTE, CA
L-8

SAN CLEMENTE SENIOR HOUSING -
Collaborative

PUBLIC STREESCAPE IMPROVEMENTS
ATTACHMENT 12
441
LICENSE NO. EXP. DATE ARCHITECT:

ORANGE COUNTY FIRE AUTHORITY

COMMUNITY RISK REDUCTION - PLANNING AND DEVELOPMENT SECTION CHECKED:

DATE:

SCALE:
4321
DATE NO.

DESIGNED:

DRAWN:
765
SHEET

SERVICE REQUEST NUMBER
1 FIRE MASTER PLAN

ORANGE COUNTY FIRE AUTHORITY

VICINITY MAP OCFA STAMP
<INSERT LOCATION MAP THAT

INCLUDES MAJOR CROSS

STREETS PROVIDING SITE
ACCESS>

OCFA REVIEW AND INSPECTIONS (OCFA USE ONLY)

NO OCFA REVIEW REQUIRED

PLAN REVIEW ONLY

PLAN REVIEW AND INSPECTION

OCFA STANDARD FIRE MASTER PLAN NOTES
REVISED 6/2/2020 JAH
PROJECT IS A MIXED-USE REDEVELOPMENT INCLUDING TWO, 4-STORY RESIDENTIAL BUILDINGS (BUILDINGS1 AND 2) AND A 7,500 SF MEDICAL OFFICE BUILDING (BUILDING 3) <INSERT <INSERT LOCATION MAPTHAT

INCLUDES MAJOR S MAJOR S MAJO R S MAJOR S CROSS

STREETS STREETS STREETS STREETS STREETS PROVIDING SIT ING SIT ING SIT I E ACCESS> ACC S
654 CAMINO DEL LOS MARES, SAN CLEMENTE, CA 92673
2022-160
LLA LL-98-76
INST. NO. 19990852746 O.R.
250
4, 4, & 1
55'-4", 51'-4", 20'-0"
●
●
●●
●●
●●
●
●
●
●
●
3,500 4 HOURS
●
●●●
●

WODEN FIRE
Josh Apolenis
106 W 4TH ST, SUITE 308
Santa Ana
240.688.0980
[email protected]
[email protected]
CA 92701
949.452.3627
CA 92653 Laguna Hills
24451 Health Center Drive
Aaron Coley
Saddleback Memorial Medical Center

SAN CLEMENTE BUILDING DEPARTMENT

SAN CLEMENTE PLANNING DEPARTMENT

SAN CLEMENTE PUBIC WORKS

MUNICIPAL WATER DISTRICT OF ORANGE COUNTY

SAN CLEMENTE SENIOR HOUSING PROJECT
●●
●●●
●
●●●●
●
●
ATTACHMENT 12
442
  

 


   
    
 

9 2
/
#
4 5+.
#
4 &
0 #
*
   
 
7(
7(
7(
21/<
 7&
 7&

 
7&
        &(    &(
  
7&
        &(    &(
(9 (9
9 ( (9
(
9 9
(
9 (
9 (
9 (
9 (
9 (
9 (
9 (
9 (
(9
(
9 (
9 (
9 (
9 (
9 (
9 (
9 (
9 (
9 (9 (9 (9
(9
(9 (9 (9 (9 03
03 


















&$0 1, 2 '( /26 0$5(6
&$0,12'(/260$5(6



 
 
ACCESS POINT SEPARATION = 532'-9"
SITE DIAGONAL = 855'-0"


HOSE PULL = 150'-0"
HOSE PULL = 150'-0"
0"- HOSE PULL = 150'
0"- HOSE PULL = 150'


HOSE PULL = 150'-0"HOSE PULL = 150'-0"
0"- HOSE PULL = 150'
0"- HOSE PULL = 150'
5 

5 

5 

)'&
)'&
5 

5 
 5 




7"- DEAD END = 93'


6"- DEAD END = 100'





6"- FIRE HYDRANT SPACING = 283'
FIRE HYDRANT SPACING = 235'-0" FIRE HYDRANT SPACING = 258-0" 9"- FIRE HYDRANT SPACING = 229'
FIRE HYDRANT SPACING = 277'-7"
























HOSE PULL = 150'-0" HOSE PULL = 150'-0"
.%
.%
.%
.%




.%
.%
.%
.%

















LOUNGE / LOBBY
ENTRY
STAIR

STAIR STAIRSTAIR
STAIR

POOL DECK
5 

5 


5 

5 


5 

5 


5  

5 


5  

5 


5 

5 


ELEV.

ELEV.

ELEV.


%8,/',1*

81,76
6(1,255(6,'(17,$/
%8,/',1*
81,76
6(1,255(6,'(17,$/
%8,/',1*
+($/7+&(17(5
%8,/',1*
LEGEND
INDICATES PROPOSED FIRE DEPARTMENT CONNECTION LOCATIONS FOR REFERENCE ONLYINDICATES HOSE PULL DISTANCE FROM FIRE ACCESS ROADWAYINDICATES OUT OF ACCESS FROM 150' HOSE PULL INDICATES STAIR LOCATIONSINDICATES PORTION OF THE BUILDING'S EXTERIOR WALL 20-40INDICATES PROPOSED PRIVATE FIRE HYDRANTINDICATES AT GRADE POINT OF EGRESS / INGRESS INTO THE STRUCTUREINDICATES DEAD END TRAVEL DISTANCE IN FIRE ACCESS ROADWAYINDICATES FIRE HYDRANT SPACINGINDICATES FIRE ACCESS LANE CURBINDICATES FIRE ACCESS LANEFEET FROM THE FIRE LANE )'&

INDICATES ELEVATOR LOCATIONS
KB INDICATES APPROXIMATE LOCATION OF KNOX BOX WITH 3-
SETS OF ENTRY DOOR/GATE KEYSINDICATES BLUE REFLECTIVE MARKERINDICATES 2-HOUR FIRE RESISTANCE WALL RATING .(<127(/(*(1' ),5($&&(663/$1
6<0%2/ '(6&5,37,21
FIRE DEPARTMENT CONNECTION SERVING THE RESIDENTIAL BUILDING. 
FIRE DEPARTMENT CONNECTION SERVING THE MEDICAL OFFICE BUILDING (MOB). %8,/',1*'$7$

BUILDING LEVELS CONSTRUCTION TYPE AUTOMATIC FIRE

SPRINKLERS SQUARE FOOTAGE
BUILDING 1
SENIOR

RESIDENTIAL
4 LEVELS TYPE V-A 103,951 SF FULL NFPA 134 LEVELS TYPE V-A 148,226 SF FULL NFPA 13 BUILDING 2
SENIOR

RESIDENTIAL
BUILDING 3
HEALTH CENTER 1 LEVEL TYPE V-A 7,500 SF FULL NFPA 13

FIRE FLOW TEST INFORMATION
*(1(5$/127(61. THE HEALTH CENTER BUILDING WILL NOT BE DESIGNED TO ACCOMMODATE TENANTS THAT

MAY CONDUCT MEDICAL PROCEDURES THAT REQUIRE THE USE OF GENERAL ANESTHESIA OR OTHER PROCEDURES THAT MAY RENDER PATIENTS INCAPABLE OF SELF-PRESERVATION FOR ANY PERIOD OF TIME, SUCH AS AN OUTPATIENT SURGICAL CENTER, DIALYSIS CENTER, ETC. 3URMHFW1XPEHU'DWH'UDZQ%\&KHFNHG%\
:2'(1),5(
:7+6768,7(
6$17$$1$&$



  



30 )03
),5($&&(663/$1
0(025,$/&$5(+($/7+
6<67(0
6$1&/(0(17(6(1,25
+286,1*
6+
-$

:)
SCALE: 1" = 30'-0" 1 SITE PLAN - FIRE ACCESS
1R 'HVFULSWLRQ 'DWH
ATTACHMENT 12
443

AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 11/1/2022 Agenda Item: A.

Department: Finance and Administrative Services
Prepared By: Jacob Rahn, Financial Services Officer
Subject:

TRANSIENT OCCUPANCY TAX ALLOCATION
Fiscal Impact:

The City’s FY 2023 budget includes $3.0 million in Transient Occupancy Tax (TOT) revenues.

Although not specifically designated for any particular use, these General Fund revenues support a variety of City services and staffing needs.

Summary:

Council asked for staff to bring back information on TOT revenues and potentially earmarking TOT revenues to promote events and tourism. Supporting events and enhancing revenue is consistent with the City Council Priorities and the General Plan Goals and Policies. Fiscal Policy approved as part of the Long Term Financial Plan (LTFP) and the Budget process precludes a direct allocation of general fund revenues into a specific use (see Attachment 1).

Background:

On September 20, 2022, City Council requested staff provide information related to utilization of TOT to support or promote events, activities, and tourism. TOT is a general tax imposed on overnight accommodations for visitors to the City. The San Clemente rate for TOT is 10%. Attachment 2 provides a description and authorization of the TOT revenue accounts. These revenues are received in the General Fund and are directed through the annual budget process with other General Fund revenues to support General Fund expenditures. The City’s Fiscal Policy states: “General Fund revenue categories (sales tax revenue by example) may not be committed directly to fund a specific expenditure line item or program.”
Discussion:

The FY 2023 budget has $3.0 million of TOT revenues budgeted in the General Fund. These funds are not earmarked for specific purposes. Rather, TOT revenues fund expenditures through the City’s annual budget process. These TOT revenues indirectly fund costs associated with higher activity levels based on population impacts from tourism and temporary lodging. Examples of increased service levels include seasonal lifeguard staffing, police services and overtime, trolley operations, facilities maintenance, and various other departmental costs. City Council also direct amounts to local business and event support, such as the annual DBA subsidy of $34,000 (001-151-44739) and the rental of parking lots to support expanded public parking ($37,800 under 001-151-43710) along with other recreation partnerships.

As stated above, specific earmarking of General Fund is inconsistent with Fiscal Policy. In order to earmark TOT revenues for a specific use, Council would need to modify Fiscal Policy and provide CITY OF SAN CLEMENTE Page 1 of 3 Printed on 10/26/2022
powered by Legistar™444
Meeting Date: 11/1/2022 Agenda Item: A.
direction on the specific purpose.

Plan and Policy Consistency:

Allocation of resources for events and tourism through the LTFP and Budget process is consistent with the following General Plan Goals and Policies:
· Governance Element, Municipal Finance Goal: Establish and maintain an easily understood, transparent, and accountable municipal finance system that implements the Mission Statement, Vision and Centennial General Plan, safeguards the City’s assets and maintains the public’s trust.
· Policy G-2.09. General Fund Purpose. We pursue a strategy to allocate general fund resources toward the City’s provision of basic municipal services. · Policy G-1.06. Role of Long Term Financial Plan. In the preparation of an annual budget, we follow the Long Term Financial Plan (LTFP), a document that connects Council, staff and citizen priorities to available resources.
· Public Services, Utilities, and Facilities Element, Arts and Culture Goal: Continue to be a City which celebrates and enjoys outstanding artistic and cultural experiences that enrich the lives of San Clemente’s residents and visitors.
· Policy PSFU-3.05. Private-Public Sector Events. We partner with private and nonprofit sectors to promote participation in cultural activities including fairs, festivals and other events geared to neighborhoods, the City and a whole and the region. · Policy PSFU-3.06. Surfing and Beach Cultures. We recognize and help support the work of artists and organizations that promote, preserve and celebrate San Clemente’s rich surfing history, culture and art.
· Economic Development Element, Tourism Goal: Create a branded and marketed tourism identity that attracts overnight visitors.
· Policy ED-3.01. Allocation of Resources for Tourism. We allocate public resources among various tourism efforts based on the Economic Development Strategy. o Note: The Economic Development Element includes numerous policies supporting tourism, especially tourism that emphasizes year-round visitation and promotion of surfing, heritage, bicycle access, and sporting events.

Council Strategy:

Tourism and marketing could generate additional tax revenue for the City, which is consistent with Council Strategy 1 - Ensure financial stability as demonstrated by low debt, high ratings, and new revenue generation.

Recommended Actions:

Staff Recommendation
1) Provide direction to staff for earmarking of TOT revenues to make policy modification, as necessary.

CITY OF SAN CLEMENTE Page 2 of 3 Printed on 10/26/2022
powered by Legistar™445
Meeting Date: 11/1/2022 Agenda Item: A.

Attachment:

Attachment 1 - Fiscal Policy Excerpt 2022-2023 City Adopted Budget Attachment 2 - TOT and STLU Revenue Accounts
Notification:

None.

CITY OF SAN CLEMENTE Page 3 of 3 Printed on 10/26/2022
powered by Legistar™446
Fiscal Policy
Fiscal Policy Statement Status Comments
Revenue Policies
The City will try to maintain a diversified and stable revenue system to shelter it from short-term fluctuations in any one revenue source.
√
The City will estimate its annual revenues by an objective, analytical process utilizing trend, judgmental, and statistical analysis as appropriate.
√
All City Council-established General Fund User fees will be reviewed and adjusted annually as part of the budget process by each City department and the analysis with recommended changes will be provided to the City Council. The basis for adjustment will be the cost of providing services, inflationary impacts, or other budgetary factors as appropriate. User fees will be established to recover the full cost of services provided, except when the City Council determines that a subsidy from the General Fund is in the public interest.
√
One-time operating, capital, and reserve revenues will be used for one-time expenditures. Exceptions must be formally adopted by Council action and may only offset operating expenditures for a limited time period of less than five fiscal years.
√
The City will annually identify developer fees and permit charges received from “non-recurring” services performed in the processing of new development and use those funds to meet peak workload requirements.
√
General Fund revenue categories (sales tax revenue by example) may not be committed directly to fund a specific expenditure line item or program.
√
Expenditure Policies
The purchase of new or replacement capital equipment with a value of $5,000 or more and with a minimum useful life of two years will require budget approval.
√
The City will annually project its equipment replacement and maintenance needs for the next five years and will update this projection each year. A maintenance and replacement schedule will be developed and followed.
√
447
448
449

AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 11/1/2022 Agenda Item: B.

Department: Public Works
Prepared By: Zak Ponsen, Assistant City Engineer
Subject:

REPORT OF TRAFFIC CALMING PETITIONS RECEIVED REGARDING THE COAST

NEIGHBORHOOD AND CALLE FRONTERA
Fiscal Impact:

None to receive and file this report.

Summary:

Public Works staff is in the process of reviewing traffic calming petitions that were received from members of The Coast neighborhood for the streets of Calle Frontera, Calle Juarez, and Calle Vallarta.

Background:

There is an extensive history of staff working with The Coast Homeowners Association (CHOA) to address residents’ traffic concerns within the community. The primary concerns of the homeowners are speeding on Calle Frontera and cut-through traffic. Various traffic-calming measures have been implemented over the years within The Coast community such as the neighborhood speed watch program, increased police enforcement, installation of bot dots, additional speed limit signs, removal of the centerline, adding striping of an edge line, adding two median islands, and adding decorative pavers in the street. Ultimately, the bot dots were removed due to noise complaints.

During Oral Communications (Part 1) of the October 18, 2022 City Council meeting, several residents of The Coast neighborhood spoke of their desire for additional traffic calming measures to be implemented on the streets of Calle Frontera, Calle Juarez, and Calle Vallarta. City Council directed staff to report back on the matter at its next City Council meeting.

Discussion:

On August 11, 2022, staff received a formal petition for traffic calming and speed cushions from residents of Calle Frontera. Staff conducted the necessary speed survey studies and requested the main contact petitioner to get CHOA consent to the request. At that time, the CHOA then contacted staff and requested the entire CHOA area be studied and that approximately 20 stop signs be added.

Per our City Traffic Calming Policy and Resource Manual, City staff organized a public meeting, which was held on September 29, 2022, and attended by approximately 50 residents. At this meeting, staff discussed the Calle Frontera petition and answered questions regarding the policy and how to get other streets included. As a group, it was determined that the residents mostly wanted new traffic calming on Calle Frontera, Calle Juarez, and Calle Vallarta. Staff requested residents on those streets to formalize petitions for those streets so that all three streets could be processed at the same time. Staff also explained that the City analyzed the intersection of Calle Juarez and Calle Frontera for a potential stop sign, and found that the data would not justify installation of a stop sign.

CITY OF SAN CLEMENTE Page 1 of 3 Printed on 10/27/2022
powered by Legistar™450
Meeting Date: 11/1/2022 Agenda Item: B.

Frontera for a potential stop sign, and found that the data would not justify installation of a stop sign.

After the meeting, the CHOA contacted staff again to remove the CHOA request for stop signs and to proceed with other traffic calming studies.

Staff received the following formal petitions:
· Calle Frontera (August 11, 2022)
· Calle Juarez (October 4, 2022)
· Calle Vallarta (via the CHOA on October 12, 2022)
Per the City’s Speed Hump Policy and the City’s Traffic Calming Policy and Resource Manual (attached), the next steps for these applications would be:
· Finalize the street survey and speed data studies;
· Contact the residents that reside directly adjacent to the proposed traffic calming improvements, and obtain resident approval for improvements to be constructed in front of their properties;
· Agendize all three streets for an upcoming Planning Commission hearing (tentatively November 16, 2022);
· If recommended for approval by the Planning Commission, agendize the matter for City Council consideration (tentatively December 6, 2022). This item would also include funding analysis of the proposal.

Plan and Policy Consistency:

The action is consistent with the following General Plan Goals and Policies:
· M-1.15. Residential Quality. Protect the quality of residential areas by managing traffic volumes and speeds on residential neighborhood streets. · M-1.19. Traffic Calming. We design the circulation system serving new developments, and retrofit existing streets, where feasible, to control traffic speeds and maintain safety in all residential neighborhoods, in accordance with the City’s Street Design Standards and Traffic Calming Manual.
· M-3.04. Manage Traffic Speeds. We use a combination of effective design and traffic code enforcement to manage traffic speeds.

Council Strategy:

The action is consistent with Council Strategies 2 and 3:
· Strategy 2 - Grow resident confidence and value in City services and operations in that the public’s request is following City policy and procedures. · Strategy 3 - Update and maintain infrastructure that reflects best available technology and service - in that the projects update City infrastructure.

Recommended Actions:

Staff Recommendation
That the City Council receive and file the administrative report dated November 1, 2022.

CITY OF SAN CLEMENTE Page 2 of 3 Printed on 10/27/2022
powered by Legistar™451
Meeting Date: 11/1/2022 Agenda Item: B.

Attachment:

San Clemente Traffic Control Policy and Resource Manual San Clemente Speed Hump Policy
Notification:

None.

CITY OF SAN CLEMENTE Page 3 of 3 Printed on 10/27/2022
powered by Legistar™452
San Clemente Traffic Calming Policy and
Resource Manual

City of San Clemente
910 Calle Negocio, Suite 100
San Clemente, California 92673
2401 E. Katella Avenue, Suite 450
Anaheim, California 92806
453
City of San Clemente
Traffic Calming Policy and Resource Manual

TABLE OF CONTENTS
Introduction ........................................................................................................................... 1 Roadway Designations ......................................................................................................... 1 City of San Clemente Traffic Calming Process................................................................... 2

1. Plan Initiation ................................................................................................................. 4

2. Plan Development.......................................................................................................... 6

3. Neighborhood Support ................................................................................................. 7

4. City Council Approvals and Implementation............................................................... 8 Appendix A .......................................................................................................................... 11

1. Traditional Enforcement............................................................................................. 12

2. Speed Feedback Sign................................................................................................. 13

3. Education .................................................................................................................... 14

4. Radar Speed Trailer.................................................................................................... 15

5. Lane Narrowing........................................................................................................... 16

6. Edge Line..................................................................................................................... 17

7. Chicane/ Deviation...................................................................................................... 18

8. Angled Slow Points .................................................................................................... 19

9. Forced Turn Barriers .................................................................................................. 20

10. Gateway Treatment................................................................................................... 21

11. Mid-block Median...................................................................................................... 22

12. Modified Intersection................................................................................................ 23

13. Landscaping.............................................................................................................. 24

14. Neck Downs/Chokers ............................................................................................... 25

15. One-way Streets........................................................................................................ 26

16. Roundabouts............................................................................................................. 27

17. Traffic Circles............................................................................................................ 28

18. Raised Crosswalks ................................................................................................... 29

19. Speed Humps............................................................................................................ 30

20. Raised Intersections................................................................................................. 32

21. Partial Street Closure ............................................................................................... 33

22. Diagonal Diverters .................................................................................................... 34

23. Traversable Barriers................................................................................................. 35

24. Street Closure or Cul-de-sac ................................................................................... 36

25. Turn Restriction/Prohibition Signs ......................................................................... 37 454
City of San Clemente
Traffic Calming Policy and Resource Manual
1 INTRODUCTION
The purpose of this Traffic Calming Policy and Resource Manual is to assist community leaders, City staff and residents with an understanding of the City of San Clemente’s Traffic Calming Program. One of the most persistent and emotional complaints that the City receives is speeding on residential streets. Traffic Calming is the management of traffic so that its negative impacts on residents, pedestrians and schools are minimized.

Traffic Calming elements are those traffic control devices and programs that regulate, warn, guide, inform, enforce and educate motorists, bicyclists and pedestrians. These elements include signing and striping applications, minor roadway design/construction to improve visibility and safety, enforcement by police services, public outreach and safety education. These elements promote safe and pleasant conditions for residents, pedestrians, bicyclists, and motorists on neighborhood streets. They assist in reducing vehicular traffic on local neighborhood streets, reduce the average speed of traffic on local neighborhood streets, and preserve and enhance pedestrian and bicycle access to neighborhood destinations.

The mission of a Traffic Calming Program is to improve community safety, preserve community character and enhance the local neighborhoods by working with the residents to implement solutions to concerns created by automobile traffic on neighborhood streets. Neighborhood traffic management programs are becoming standard practice for many cities around the world that are taking an active role in managing growth and making sure their roadways are safe, attractive, and convenient for all users. Citizens play an integral role in developing successful traffic management programs for their streets by working with City staff and utilizing street design tools, education, and enforcement to determine ways to attempt to manage and calm traffic.

The goal of the Traffic Calming Policy and Resource Manual will be to develop a process to assess various city streets and address problems such as speeding traffic, increased traffic volumes, and safety and provide those tools available to address and mitigate the problems.

This manual provides the necessary tools for the City of San Clemente to successfully implement Traffic Calming Programs on public streets. It provides a course to follow that will guide the users through a comprehensive process to determine the most practicable and effective mitigation for a specific problem. It provides a “tool box” of different techniques that can be used alone or in combinations with other tools to manage neighborhood traffic. Included is a summary chart, which is a useful means in selecting treatments to consider in the development stage of the process. Each tool’s description provides the user with the advantages and disadvantages of each technique and the level of effectiveness. It also lists those characteristics that it specifically addresses such as speed reduction. Although intended for use on the City’s public streets, it can be used by communities with private streets.

ROADWAY DESIGNATIONS
From the City’s General Plan Circulation Element, the roadway system in San Clemente is defined using a classification system that describes a hierarchy of facility types. The categories of roadways included in this classification system differentiate the size, 455
City of San Clemente
Traffic Calming Policy and Resource Manual
2 function and capacity of the roadway links for each type of roadway. There are six basic categories in the hierarchy, ranging from "freeway" with the highest capacity to "local" streets with the lowest capacity and can be summarized as follows:

Freeway - A six- to ten-lane divided arterial roadway with full access control, grade separations at all intersections and a typical right-of-way width in excess of 150 feet, designed and maintained by the State Department of Transportation.

Major - A six-lane divided roadway with a typical right-of-way width of 120 feet and a curb-to-curb pavement width of approximately 100 feet. This classification accommodates 30,000 to 45,000 ADT (Average Daily Traffic).

Primary - A four-lane divided roadway with a typical right-of-way width of 100 feet and curb-to-curb pavement width of approximately 84 feet. This classification accommodates 20,000 to 30,000 ADT.

Secondary - A four-lane undivided roadway, with a typical right-of-way width of 80 feet and a curb-to-curb pavement width of approximately 64 feet. This classification accommodates 10,000 to 20,000 ADT.

Local Collector- A two-lane undivided roadway with a typical right-of-way width of 60 feet and a pavement width of approximately 40 feet. This category of roadway is designed to provide access to individual parcels in the City. This classification accommodates 7,500 to 10,000 ADT.

Although not specifically discussed in the Circulation Element, there is also the residential or local street designation.

Local/Residential - Two-lane streets with a typical right of way width of 40-60 feet and a pavement width of 24-40 feet. This type of roadway typically accesses residential parcels and accommodates less than 7,500 ADT.

CITY OF SAN CLEMENTE TRAFFIC CALMING PROCESS
The following is a brief outline of the process to achieve the goals of the San Clemente Traffic Calming Policy and Resource Manual. Figure 1 provides a flow chart that provides the steps that the City will follow when considering traffic calming measures.

Four major steps are shown. Depending on the particular issues, not all of the major steps may be necessary. The four major steps are:

1. Plan Initiation

2. Plan Development

3. Neighborhood Support

4. City Council Approval and Implementation
456
City of San Clemente
Traffic Calming Policy and Resource Manual
3 457
City of San Clemente
Traffic Calming Policy and Resource Manual
4 1. Plan Initiation
Citizen Request
The first component of the process is the initial request. The process would begin when a resident or group contacts City staff by telephone, letter or e-mail to discuss and make them aware of a potential neighborhood traffic problem. A resident or group may also address the City Council or Planning Commission. Problems typically would be regarding speeding, traffic volumes or traffic-related safety issues within their neighborhood. The request should describe the problem and affected area. The residents may also provide any supporting data that may have been gathered that they feel will further assist City staff with their request. The request should have the signatures of ten supporting residents in the affected area.

Traffic Engineering Staff Review
City staff reviews problem and visits the site. Staff will determine if enhanced enforcement by the Sheriffs Department or a radar speed trailer will mitigate the situation. If it is determined that this is the most effective mitigation, staff will work with the Sheriffs Department to implement and the request will be addressed with no further action. If these measures do not effectively mitigate the problems, staff will further define the area impacted by the problem.

Define Study Area
The area affected by the problem will be defined by City staff according to the petition and later refined with residents and staff’s knowledge of where the traffic-related concerns occur. Staff may contact the initiators of the petition to gain a better understanding of the neighborhood concerns. Staff will also determine whether the traffic-related issue affects multiple streets or a single street. Determining the area affected by the problem is necessary to understand where initial traffic data should be collected or if development of a plan would potentially affect other nearby streets.

Collect Initial Traffic Data
Staff will perform a more detailed field review of the area defined by the problem and collect preliminary traffic data. Traffic data collection may include the following:
x Traffic speeds
x Traffic volumes
x Three-year collision history
Traffic volumes will be collected for a minimum of 24 hours using a pneumatic hose count machine at the locations identified in the petition. The City may also conduct a radar speed survey with an unmarked vehicle so that vehicles do not slow down as soon as they see the “typical” radar trailer or an officer from the Sheriffs department in a marked car. The three-year collision history may be collected to determine the type and severity of collisions in the neighborhood. This information will be used to rank the magnitude of traffic issues. Staff will also identify parks, school, bus routes, and/or other significant characteristics of the affected area.
458
City of San Clemente
Traffic Calming Policy and Resource Manual
5 Once the initial data has been collected, analyzed and interpreted for the affected neighborhood, staff will notify and work with the residents in the area. The impacted area may encompass a single street or multiple streets. Historically, the traffic-related issues on a single street are much simpler to address and typically involve fewer neighborhood traffic management devices. Multiple street plans include more than one affected street and will consequently require greater resources to implement and have the potential to affect a greater number of residents.

Determine Eligibility for Traffic Calming Tools
Staff will utilize a point system to determine if the residential neighborhood qualifies for traffic calming treatments. The table below shows how a value is assigned to each data element.

When data such as speed and volume is gathered at more than one location within the neighborhood, points will be assigned for each location and then averaged to ensure equitable comparisons.

Data Element Points Basis for Points
Speed 0 to 30 Extent that 85th percentile* speeds exceed speed limit; 2 points assigned for every 1 mph over speed limit
ADT Volume 0 to 25
1 point for every 25 vehicles over 500 ADT for local residential streets or 1 point for every 100 vehicles over 1500 ADT for collector residential streets.

Crashes 0 to 15 1 point for every nonfatal crash and 5 points for every fatal crash recorded by the Sheriff’s Department in the last 3 years Pedestrian
Generators 0 to 20 5 points for every school, park, beach, bus stop, community center, library, or other public facility within the impact area Sidewalks or
pathways 0 to 10
5 points if there are not continuous sidewalks or pathways on one side of all local residential streets or both sides of all collectors; 10 points if there are no sidewalks
Discretionary
Factors 0 to 10
Up to 10 points may be awarded by the City Manager for
additional data provided by residents, percentage of residents in support, and other factors.

Total Points
Possible 100
*The 85th percentile speed is the speed at or below which 85 percent of the vehicles travel.

A minimum total score of 51 points is required for the residential neighborhood to qualify for traffic calming treatments. If it is not eligible or it is determined that there are no tools available to address the problem, no further action will be taken. 459
City of San Clemente
Traffic Calming Policy and Resource Manual
6 For arterial streets, the following minimum eligibility guidelines must be satisfied in order to proceed further with the process:

1. The 85th percentile speed is at least 9 mph above the prima-facie speed limit

2. Peak hour traffic volume is between 1000 and 2000 vehicles

3. Roadway has a minimum length of one-half mile
Priority System
If the eligibility guidelines are met, the City will rank the various petitions when cumulative applications exceed current staff resources. The highest ranked applications may then move to the next step in the process with current staff or outside consultants.

2. Plan Development
Notifying the Neighborhood
At this time, staff has determined that traffic calming measures may be warranted. The residents/property owners in the neighborhood impacted by the problem will be notified that the City is investigating and considering implementing one or more traffic calming measures in their neighborhood that may directly or indirectly affect them. This notification may be either by direct mail or hand delivered notices to all impacted stakeholders in the neighborhood.

Neighborhood Meeting
City staff will schedule a neighborhood meeting with those residents and stakeholders impacted by the problem. At this meeting, staff will present the attendees with an overview of the City’s Traffic Calming program process. The traffic-related concerns will be presented and discussed to define the objectives. A map of the affected area will be presented and potential types of various traffic calming devices will be discussed. Staff will review the analysis of the available data and may present an initial plan to mitigate the traffic concerns raised by the residents in the petition. Any other supplemental traffic data needs required for the process will be identified and the course of action necessary to procure such data will be defined.

Staff will provide information to the neighborhood residents about the various possible funding options for traffic calming in the City. It may be necessary to schedule more than one meeting to meet the objectives outlined in the City’s Plan Development phase of the traffic calming process.

Plan Development
City staff will further review the data previously collected and any new data obtained as a result of the neighborhood meeting(s). Staff will revisit their initial recommendations and formulate any new or additional recommendations to mitigate the traffic problem in the impacted area.

Neighborhood input will be taken into consideration during this step of the process.

City staff will then identify and select from the toolbox those devices that treat the issues surrounding the particular traffic problem in accordance with the eligibility guidelines.

Consult Affected Agencies
Once engineering staff has determined that the program meets the eligibility requirements and has developed a plan they feel appropriately addresses the traffic-related issues, feedback will 460
City of San Clemente
Traffic Calming Policy and Resource Manual
7 be solicited from other agencies that may be potentially affected by the plan. The intent of this process is to identify concerns and potential modifications to the plan. Agencies to be contacted may include:
x Orange County Fire Authority
x Orange County Sheriff’s Department
x Orange County Transit Authority (OCTA)
x Capistrano Unified School District
Define the Area Impacted by the Solution
Once staff has identified the problem, determined the area impacted by the problem, identified the traffic calming program to address the problem, met and received input from affected residents and stakeholders, staff will determine the areas impacted by the solution. This will include the area impacted by the problem in addition to those areas that may be impacted by the solution. History has shown that solving a traffic problem in one neighborhood may cause the problem to relocate to another area in close proximity. Not all traffic calming devices have this potential, but some do. Staff will determine if the proposed traffic calming devices may have an impact on surrounding areas not defined in the area impacted by the problem. This step is critical in gathering support from all of those affected by not only the problem, but also the solution.

3. Neighborhood Support
Neighborhood Meeting
Staff will schedule a meeting with those impacted by the problem and those impacted by the solution. At this point, staff has already met with those impacted by the problem and received their comments and concerns. In addition, traffic engineering staff have reviewed additional information as well as received responses from the affected agencies. This information is used to either solidify the proposed traffic calming program or require refinements to what was previously envisioned as a viable solution.

Staff will review the draft plan with those in attendance at the meeting. Further input from the affected neighborhood residents and stakeholders will be requested. Again, residents will be asked to provide input on any aesthetic enhancements as part of the traffic calming devices that they feel would be beneficial to the neighborhood.

Staff may revise the traffic calming plan based upon feedback from the neighborhood. If it was determined that there is not consensus, traffic engineering staff may stop any further action, proceed back to the Plan Development stage or proceed to the Planning Commission.

Staff will provide the estimated cost of the proposed plan and discuss the funding options to implement the plan. The neighborhood residents can also determine what type if any aesthetic improvements they desire and are willing to fund as part of the implementation of the traffic calming plan.

Planning Commission
City staff will present the proposed traffic calming plan to the Planning Commission for review, 461
City of San Clemente
Traffic Calming Policy and Resource Manual
8 comment and recommendation to the City Council.

4. City Council Approvals and Implementation
After the Planning Commission has been presented with the proposed traffic calming plan, staff will present it to the City Council for recommendation and approval. The staff report will provide the steps taken to establish the proposed plan, provide expected results and discuss neighborhood support, affected agency feedback and the estimated cost to implement the plan.

In addition, any outside funding sources will be identified along with the process through which to procure these funds and the estimated time frame to do so.

The City Council will then make its decision based on the staff report and any feedback that may be received during the public hearing at the City Council meeting.

If the City Council does not approve the proposed traffic calming plan, a decision will be made to either stop the process or go back to the Plan Development step and reconsider alternative traffic calming devices and redefine the proposed plan. If the City Council approves the proposed plan as presented or with modifications, funding options will be considered.

Funding Options
The City Council may direct staff to proceed with implementing the proposed program with existing City funds. It may also choose this option with the understanding that the neighborhoods affected by the proposed plan will provide additional funds to further aesthetically enhance the proposed traffic calming devices. In addition, it may be determined in the Neighborhood Meetings that the affected neighborhoods have volunteered to fund the entire program implementation.

The City Council may also choose to approve the proposed traffic calming program, but delay its implementation until funds are available. This may involve approval of the program with direction to City staff to incorporate the respected program improvement into the City’s Capital Improvement Program (CIP). When the funds are programmed for this project, staff will proceed with project implementation.

Environmental Review & Design
The first step in implementing the approved traffic calming program will be to determine if any environmental documentation is necessary in accordance with the California Environmental Quality Act (CEQA) and/or the National Environmental Policy Act (NEPA). CEQA is the state mandated environmental program and NEPA is the federal mandated environmental program. If deemed necessary, City staff will prepare the necessary documents to meet the guidelines established through either or both CEQA/NEPA.

Staff will then begin the design stage of the implementation process by preparing plans specifications and estimates (PS&E). These are the construction documents necessary for a contractor to construct the improvements determined for a particular traffic calming program.

Once the City Engineer has approved the PS&E, staff will advertise and solicit bids from qualified contractors to construct the respective traffic calming devices.

Construction
462
City of San Clemente
Traffic Calming Policy and Resource Manual
9 The contractor will construct the devices identified in the PS&E package in accordance with all applicable standards, specifications and requirements. These devices may be temporary or permanent installations depending on what was defined in the proposed traffic calming program and the scope of the PS&E.

Post Project Evaluation
After construction of the approved traffic management plan improvements, traffic engineering staff will rely on the community members, the sheriffs department and field observations for feedback on the constructed devices. Based on this feedback, the City will determine the next steps, if any. For example, the approved plan may have produced reasonable and satisfactory results and therefore there is nothing further for the City to do. This evaluation will also assist staff in addressing future traffic problems in other areas. It will serve as a “lesson learned” synopsis.

If the approved plan has not produced reasonable and satisfactory results, the following options are available:
x Take no further action
x Collect additional traffic data
x Modify constructed devices
x Implement additional traffic calming measures
The following table provides a list of the devices presented in the Tool Box (Appendix A). It identifies the device, the direct and indirect issue it addresses, and provides a range of expected costs to implement. These costs are based on the typical application and will vary depending on such factors as street width, length, environmental issues, aesthetic enhancements and if right-of-way acquisition is necessary. They are provided only as a guideline and as discussed in the process, more detailed cost estimates will be prepared for each proposed traffic calming program.
463
City of San Clemente
Traffic Calming Policy and Resource Manual
10 Toolbox Item
Speed
Reduction
Volume
Reduction
Improves
Safety
Increase in
Noise and
Pollution
Local Streets
(Residential)
Collector/
Secondary
Streets
Arterial
Streets
Estimated
Construction
Cost
1 Enforcement (Visible
& Active Police
Presence)
X I X X X X Indirect
2 Speed Feedback Sign X I X X X X $8,000 - $10,000
3 Neighborhood Traffic
Safety Campaign
(Education)
X O X X X Varies
4 Radar Trailer X I X X X X Indirect
5 Lane Narrowing X I O X X X $10,000 - $25,000
6 Edge Line X I O X X X $2,500 - $5,000
7 Chicane/Deviation X O X X $15,000 - $35,000
8 Angled Slow Points X O X O $12,000 - $20,000
9 Forced Turn Islands,
Barriers,
Channelization
I X X X $4,500 - $10,000
10 Gateway Treatment X I X X O $15,000 - $20,000
11 Mid-Block Median X O X X X $7,500 – $25,000
12 Modified Intersection X I X X X $7,500 - $15,000
13 Landscaping X I X X X Varies
14 Neck downs/Chokers X O X X $40,000 - $60,000
15 One-way Streets I X X X $2,000 - $7,500
16 Roundabouts (singlelane) X O X O $150,000 -
$200,000
17 Traffic Circle X O X X O $12,000 - $20,000
18 Raised Crosswalk X O X Midblock $5,000 - $7,500
19 Speed Humps X X X Midblock
Midblock $2,500 - $5,000
20 Raised Intersections X O X X $50,000 - $75,00
21 Partial Street Closure X X X X $5,000 - $15,000
22 Full/Diagonal
Diverters X X X X $25,000 - $50,000
23 Traversable Barriers X X $20,000 - $40,000
24 Full Closures, Cul-de
Sacs X X X $30,000 - $75,000
25 Turn Restriction Signs I X X X O O $1,000 - $3,000
X Appropriate O Moderately Appropriate I Indifferent
464
City of San Clemente
Traffic Calming Policy and Resource Manual
11 APPENDIX A
Traffic Calming Tool Box
465
City of San Clemente
Traffic Calming Policy and Resource Manual
12 1. Traditional Enforcement
This is the periodic monitoring of speed and other violations by the police department in a highly visible way to deter and prevent unacceptable driver activity. This is a medium to high cost tool.

Advantages:
x Good temporary public relations tool
x Serves to inform the public that speeding is undesirable behavior for which there are consequences.
x Quick Implementation
Disadvantages:
x Effects are not permanent
x Enforcement is an expensive tool
Criteria:
x Local, collector and arterial street
Level of Effectiveness
Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Temporary No Both N/A Indirect N/A
466
City of San Clemente
Traffic Calming Policy and Resource Manual
13 2. Speed Feedback Sign
Speed feedback signs perform the same functions as radar trailers but are permanent. Realtime speeds are relayed to drivers and flash when speeds exceed the limit. Speed feedback signs are typically mounted on or near speed limit signs and can be mobile units.

Advantages:
x Real-time speed feedback
x Does not physically slow emergency vehicles or buses
x Permanent Installation
Disadvantages:
x May require a power source
x Only effective for one direction of travel
x Long-term effectiveness uncertain
Criteria:
x Two lane, two-way roadway or single lane one-way roadway Level of Effectiveness
Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes No Both SmallDecrease
$8,000-
$10,000 No Impact
467
City of San Clemente
Traffic Calming Policy and Resource Manual
14 3. Education
Traffic safety campaigns for a particular neighborhood usually consist of informational leaflets, fliers or letters sent out to residents and schools.

These may show information on current travel speeds within the area with a request that neighbors adhere to posted speed limits and other traffic laws such as stopping at stop signs etc. It is not clear whether these measures actually result in safer driving conditions or whether they are effective in the reduction of traffic speeds. They target neighborhood residents so speeding resulting from non-local cut-through traffic is not affected.

Advantages:
x Helps to make residents aware of problems
x May offset some complaints from some residents
x Signs may enhance the residential nature of an area if used with other measures. x May make residents aware of a potential safety problem Disadvantages:
x Effectiveness of these measures has not been verified x There may be other more effective measures to use
Criteria:
x None
Level of Effectiveness
Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Possible N/A N/A N/A Varies No Effect
468
City of San Clemente
Traffic Calming Policy and Resource Manual
15 4. Radar Speed Trailer
This is a mobile trailer-mounted radar display that measures each approaching vehicle’s speed and displays it next to the legal speed limit in clear view of the driver. This element is applicable on any street where speeding is a problem and can be moved from location to location easily.

Advantages:
x Educational tool
x Good public relations for neighborhoods
x Portable
x Effective for temporary speed reduction needs
x Quick implementation
Disadvantages:
x Not self-enforcing
x Duration of effectiveness is limited
x May require temporary lane closures
x Subject to vandalism
Criteria:
x Two to four lane, two-way roadway or single lane one-way roadway x Local, Secondary and arterials
Level of Effectiveness
Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes No Both N/A Indirect No Effect
469
City of San Clemente
Traffic Calming Policy and Resource Manual
16 5. Lane Narrowing
Curb extensions at midblock or intersection corners that narrow a street by extending the sidewalk or widening the planting strip
Advantages:
x Minor inconveniences to drivers
x Minimal inconvenience to local traffic
x Good for pedestrians due to shorter crossing distance x Slows traffic without seriously affecting emergency response time x Reduces pedestrian crossing width and increases visibility of pedestrian x Single lane narrowing reduces vehicle speed and through traffic Disadvantages:
x May impact parking and driveway access
x Unfriendly to cyclists unless designed to accommodate them x Conflict between opposing drivers arriving simultaneously could create problems.

Criteria:
x Local and collector streets over 32 feet wide with less then 7,500 vehicles per day x Street must have a speed limit of 30 mph or less
Level of Effectiveness
Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes Possible Local Small
Increase
$10,000 -
$25,000 No Effect
470
City of San Clemente
Traffic Calming Policy and Resource Manual
17 6. Edge Line
Lane striping can be used to create formal bicycle lanes, parking lanes, or edge lines. As a neighborhood traffic management measure, they are used to narrow the travel lanes for vehicles, thereby inducing drivers to lower their speeds.

Advantages:
x Inexpensive
x May reduce speed
x May increase safety for pedestrians and cyclists
x Low maintenance
x Does not slow emergency vehicles
Disadvantages:
x May not be as effective as other more structured techniques x Requires regular maintenance
Criteria:
x Local and collector streets with a minimum width of 32 feet and less then 10,000 vehicles per day
x With and without parking
x Street must have a speed limit of 35 mph or less
Level of Effectiveness
Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Possible No Both NoEffect
$2,500 -
$5,000 No Effect
471
City of San Clemente
Traffic Calming Policy and Resource Manual
18 7. Chicane/ Deviation
Chicanes are sometimes called deviations, serpentines, reversing curves and twists. Chicanes are curb extensions that alternate from one side of the street to the other, forming S-shaped curves. Chicanes can also be created by alternating on-street parking, either diagonal or parallel, between one side of the street and the other. Each parking bay can be created either by restriping the roadway or by installing raised, landscaping islands at the ends of each parking bay.

Good for locations where speeds are a problem but noise associated with Speed Humps and related measures would be unacceptable.

Advantages:
x Provides a greater visual obstruction
x Pedestrians have a reduced crossing distance
x Imposes minimal inconveniences to local traffic
x Cost is dependent on length
x Are easily negotiable by large vehicles (such as fire trucks) except under heavy traffic conditions
Disadvantages:
x Curb realignment and landscaping can be costly, especially if there are drainage issues x Must be designed carefully to discourage drivers from deviating out of the appropriate lane x May require the elimination of some on-street parking Criteria:
x Local streets over 32 feet wide with less than 7,500 vehicles per day x Two lane, two-way streets or one lane one-way streets x Not on regularly used by emergency vehicles or a bus route x Street must have a speed limit of 30 mph or less
Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes Possible
Local
Collector
(Possibly)
Small
Increase
$15,000-
$35,000
Possible
Problems
472
City of San Clemente
Traffic Calming Policy and Resource Manual
19 8. Angled Slow Points
An Angled slow point is a variant of a chicane or one-lane choker. An angled deviation to deter the path of travel so that the street is not a straight line (by the installation of offset curb extensions).

Advantages:
x Reduces vehicle speed
x More effective when used in a series
x Imposes minimal inconveniences to local traffic
x Provides space for landscaping
x Provides a visual obstruction
Disadvantages:
x Landscaping needs to be controlled to ensure visibility is not reduced x Contrary to driver expectation of unobstructed flow
x Can be hazardous for drivers and cyclists if not designed and maintained properly x Confrontation between opposing drivers arriving simultaneously may create problems x Double lane application is less effective in controlling speeds than single lane because drivers can create a straighter through movement by driving over centerline x Increases area of landscaping to be maintained by residents Criteria:
x Local and collector streets over 26 feet wide with less than 3000 vehicles per day x Two lane two-way roadways
x Not on routes regularly used by emergency vehicles or on bus routes x Street must have a speed limit of 30 mph or less
Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes Possible Local Small
Increase
$12,000-
$20,000
Possible
Problem
473
City of San Clemente
Traffic Calming Policy and Resource Manual
20 9. Forced Turn Barriers
These are traffic islands or curbs specifically designed to prevent traffic from making certain movements at an intersection or to force the traffic into specific patterns. They are sometimes referred to as "Pork Chops" or right-turn islands.

Care should be taken to evaluate the effects of diverted traffic on adjacent streets. Problems could be simply transferred from one location to another.

Advantages:
x Potential to reduce traffic speed
x Reduces traffic volumes
x Can be used to reduce cut-through traffic
x Self-enforcing
x Landscaping possible
Disadvantages:
x May reduce access for emergency vehicles
x Diversion to longer routes may cause inconvenience to and be opposed by affected residents
x Care needed if placed on transit routes
x Access to residences may also be adversely affected
x May transfer problems elsewhere
x Need to allow bicycle access
Criteria:
x Local and collector streets
x Two lane, two-way streets or single lane one-way street x Intersection leg with diverter must be stop controlled x Not on routes regularly used by emergency vehicles or a bus route Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Possible Yes Both Small
Increase
$4,500-
$10,000
Possible
Problem
474
City of San Clemente
Traffic Calming Policy and Resource Manual
21 10. Gateway Treatment
A gateway is a special entrance that reduces the width of a travel way, often implementing the use of islands. It is usually placed in a roadway to define the entry to a residential area and/or to narrow each direction of travel and interrupt the view path along the center of the roadway.

Advantages:
x High visibility to motorists to notify change in roadway nature x May discourage cut-through traffic
x Helps slow traffic
Disadvantages:
x Will increase need for maintenance
x May necessitate removal of parking
Criteria:
x Local and collector streets over 26 feet wide
x Significant entrances to neighborhood or commercial area Level of Effectiveness
Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Unlikely MixedResults Both NoEffect
$15,000-
$20,000
Possible
Problems
475
City of San Clemente
Traffic Calming Policy and Resource Manual
22 11. Mid-block Median
Mid-block medians are sometimes referred to as center island narrowing, median slow points, or median chokers. Raised islands located along the centerline of a street that narrow the travel lanes at that location
Advantages:
x Are often nicely landscaped to provide visual amenity and neighborhood identity x Provides a mid-point refuge for pedestrian crossings
x Sometimes used on wide streets to narrow travel lanes x Provides a barrier between lanes of traffic
x Works well when combined with crosswalks
Disadvantages:
x May reduce parking and driveway access
x May also limit line of sight (visibility)
x Increased maintenance
Criteria:
x Local and collector streets over 32 feet wide with less than 10,000 vehicles per day x Two lane, two-way streets
x Street must have a speed limit of 30 mph our less
Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency
Service
Possible
Improvement No Possible Both No
Effect
$7,500-
$25,000
Possible
Problems
476
City of San Clemente
Traffic Calming Policy and Resource Manual
23 12. Modified Intersection
Median devices that force turns by motorists
Advantages:
x Reduces vehicle speed
x Changes driving patterns
x Necessary to enforce changes in priority from one street to another x Reduces through traffic
x May provide space for landscaping
Disadvantages:
x May increase response times for emergency vehicles
x Reduces access to properties for residents
x May increase trip length for some residents
x Can be aesthetically unattractive if not landscaped
Criteria:
x Local and collector streets forming a T-intersection and not on a primary street x Street width greater than 26 feet
x Street must have 5000 vehicles per day or less
x Street must have a speed of 35 miles per hour or less Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes Possible Both SmallIncrease
$7,500-
$15,000
Possible
Effects
477
City of San Clemente
Traffic Calming Policy and Resource Manual
24 13. Landscaping
Treatment to a streetscape that focuses on visual aspects, landscaping and dimensional changes to communicate a sense of neighborhood and helps make motorist aware of a change in driving environment.

Advantages:
x Positive indication of a change in environment from arterial road to residential street x Reduces entry speed
x May reduces pedestrian crossing distances
x Helps give neighborhood a sense of identity
x Allows neighborhood’s creativity and participation in design Disadvantages:
x May increase maintenance responsibility. This can be eliminated if the community is responsible to maintaining the landscaping.

Criteria:
x Local, collector and arterial streets
x Existing median or a minimum street width of 32 feet
x Landscaping cannot impeded sight distance
Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Possible No Both NoEffects Varies No Effect 478
City of San Clemente
Traffic Calming Policy and Resource Manual
25 14. Neck Downs/Chokers
Neck downs, also known as nubs, bulbouts, knuckles, intersection narrowings, corner bulges, and safe crosses. Neck downs are curb extensions at intersections that reduce the roadway width from curb to curb. They "pedestrianize" intersections by shortening crossing distances for pedestrians and drawing attention to pedestrians via raised peninsulas. They also tighten the curb radii at the corners, reducing the speeds of turning vehicles.

They are good for intersections with substantial pedestrian activity and areas where vertical traffic calming measures would be unacceptable because of noise considerations.

Advantages:
x Improve pedestrian circulation and space
x Through and left-turn movements are easily negotiable by large vehicles x Create protected on-street parking bays
x Reduce speeds, especially for right-turning vehicles
x Shorter crossing distance for pedestrians
Disadvantages:
x Effectiveness is limited by the absence of vertical or horizontal deflection x May slow right-turning emergency vehicles
x Mary require bicyclists to merge with vehicular traffic x They may require the elimination of some on-street parking near the intersection Criteria:
x Streets wider than 26 feet with or without parking or wide curb lanes with 20,000 vehicles or less per day
x Intersections where there is low truck volume and other large vehicles x Near schools or other areas of high pedestrian volumes x Street must have a speed limit of 35 mph or less
Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes Possible Both Small
Increase
$40,000-
$60,000 No Effect
479
City of San Clemente
Traffic Calming Policy and Resource Manual
26 15. One-way Streets
One-way Streets and associated signs are used to restrict all through traffic in a given direction on particular streets. When used on a series of streets they can be effectively used to prevent cut-through traffic.

One-way couplets or pairs of one-way streets going in two directions are not usually used for traffic calming because they often cause an increase in traffic speed. All one-way streets have the potential to increase travel speed and they may need to be used in conjunction with other speed control devices to offset this. It is important to obtain resident input in any plan to implement one-way streets because access routes to properties on or near the streets can be affected.

Advantages:
x Simplify crossing for pedestrians
x Can be used to prevent cut-through traffic
x May provide room for a bike lane
x May allow more on-street parking to be added
Disadvantages
x May increase travel speeds
x May cause inconvenience for residents and emergency response x Best used with other speed reduction measures
x May affect adjacent streets and intersections
Criteria:
x Local, collector and arterial streets
x Preferably two parallel one-way streets
Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency
Service
Possible
Improvement No Possible Both No
Effect
$2,000-
$7,500 No Effect
480
City of San Clemente
Traffic Calming Policy and Resource Manual
27 16. Roundabouts
Roundabouts require traffic to circulate counterclockwise around a center island. Unlike traffic circles, roundabouts are used on higher volume streets to allocate right-of-way between competing movements. Vehicles in the circle have the right-of-way and those entering must yield.

Advantages:
x Can moderate traffic speeds on an arterial
x Are generally aesthetically pleasing if well landscaped x Enhanced safety compared to traffic signals, 2-way and 4-way stops x Can minimize queuing at the approaches to the intersection x Are less expensive to operate than traffic signals
Disadvantages:
x May be difficult for large vehicles (such as fire trucks) to circumnavigate x Must be designed so that the circulating lane does not encroach on the crosswalks x May require the elimination of some on-street parking x Landscaping must be maintained, either by the residents or by the municipality Criteria:
x Use on streets over 26 feet wide with 16,000 vehicles per day or less x Local, collector and arterial streets
x Intersections with 3 to 8 legs and adequate right of way x Locate at intersection before or after the one where large vehicles have to turn x Streets must have a speed limit of 45 mph or less
Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Improved Yes at
Intersection Possible Both SlightIncrease
$150,000-
$200,000
Possible
Problems
481
City of San Clemente
Traffic Calming Policy and Resource Manual
28 17. Traffic Circles
Traffic circles are a raised island located in the center of an unsignalized intersection. Drivers must maneuver around the central island rather than proceeding straight. Traffic circles replace two and four way stop controls on local streets.

Advantages:
x Reduce vehicle crashes compared to stop signs
x Are generally aesthetically pleasing if well landscaped x Enhanced safety compared to traffic signals, 2-way and 4-way stops Disadvantages:
x May be difficult for large vehicles
x Wrong way left turns could be problematic on busy residential or collector roads x Landscaping must be maintained, either by the residents or by the municipality Criteria:
x Local streets over 26 feet wide with less than 10,000 vehicles per day x Intersections with 4 legs that intersect at 90 degree angles x Street must have a speed limit of 35 mph or less
Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Improved Yes at
Intersection Possible Both SlightIncrease
$12,000-
$20,000
Possible
Problems
482
City of San Clemente
Traffic Calming Policy and Resource Manual
29 18. Raised Crosswalks
Raised crosswalks are Speed Tables outfitted with crosswalk markings and signage to channelize pedestrian crossings, providing pedestrians with a level street crossing. Also, by raising the level of the crossing, pedestrians are more visible to approaching motorists.

Raised crosswalks are good for locations where pedestrian crossings occur at haphazard locations and vehicle speeds are excessive.

Advantages:
x Improve safety for both pedestrians and vehicles
x Can have positive aesthetic value if well designed
x Are effective in reducing speeds, though not to the extent of speed humps Disadvantages:
x Textured materials, if used, can be expensive
x Impacts on drainage needs to be considered
x May increase noise and air pollution
Criteria:
x Local or collector street with 7,500 vehicles per day or less x Marked, unsignalized pedestrian crossings only
x Street must have a speed limit of 35 miles per hour or less Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency
Service
Increase for
Pedestrians Yes Possible Both Slight
Increase
$5,000-
$7,500
Possible
Effect
483
City of San Clemente
Traffic Calming Policy and Resource Manual
30 19. Speed Humps
Speed humps are rounded raised areas placed across the roadway. They are generally 10 to 14 feet long (in the direction of travel), making them distinct from the shorter “speed bumps” found in many parking lots, and are 3 to 4 inches high. The profile of a speed hump can be circular, parabolic, or sinusoidal. They are often tapered as they reach the curb on each end to allow unimpeded drainage.

Advantages:
x Relatively inexpensive
x Relatively easy for bicycles to cross if designed appropriately x Very effective in slowing travel speeds
x Good for locations where very low speeds are desired and reasonable Noise and fumes are not a major concern
Disadvantages:
x Cause a “rough ride” for all drivers
x Force large vehicles, such as emergency vehicles and those with rigid suspensions, to travel at slower speeds
x May increase noise and air pollution
x Have questionable aesthetics
Criteria:
x Local streets not on Circulation Element of the General Plan x Street shall be at least 1200 feet long
x Street shall not be a truck route
x Street shall have a maximum Average Daily Traffic (ADT) of 3000 vehicles per day x Street must have a longitudinal grade of 5% or less within 250 feet of proposed hump x Street must have a paved width of 40 feet or less
x Street must have a maximum speed limit of 25 mph
x Street shall have 15 or more buildings fronting on one side or a total or 20 or more fronting both sides of the street
484
City of San Clemente
Traffic Calming Policy and Resource Manual
31 Speed Humps – Cont.

Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes Possible Both SmallIncrease
$2,500-
$5,000
Possible
Problems
485
City of San Clemente
Traffic Calming Policy and Resource Manual
32 20. Raised Intersections
These are raised areas, which cover the entire intersection. They have ramped edges on all approaches and exits and can incorporate textured paving materials on the flat section.

The raised section is usually at sidewalk height or may be slightly below to provide a ridge for the visually disabled pedestrian. They make the entire intersection area a pedestrian oriented zone and are benefit from not impacting parking. They are a moderately expensive measure.

Raised intersections, sometimes called raised junctions, intersection bumps or plateaus.

Advantages:
x Improve safety for both pedestrians and vehicles
x Can have positive aesthetic value if well designed
x Can calm two streets at once
x Good for intersections with substantial pedestrian activity x Good for areas where other traffic calming measures would be unacceptable because they take away scarce parking spaces
Disadvantages:
x Tend to be expensive, varying by materials used
x Impact to drainage needs to be considered
x Less effective in reducing speeds than Speed Humps, Speed Tables, or Raised Crosswalks Criteria:
x Local and collector streets of any width with 10,000 vehicles per day or less x Streets must have a speed limit of 35 mph or less
x Not on routes regularly used by emergency vehicles and on bus routes Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible Yes Possible Both Small
Increase
$50,000-
$75,000
Possible
Problems
486
City of San Clemente
Traffic Calming Policy and Resource Manual
33 21. Partial Street Closure
Semi-diverters are extensions from the curb or islands - usually extending from a corner of an intersection that block one directional lane of the street.

They are used to prevent drivers from making certain turn movements at an intersection. Semidiverters can effectively reduce traffic volumes on a street although the diverted traffic may impact adjacent streets. Semi-diverters are very effective in reducing volumes at specific locations. Semi-diverters affect all drivers, including local residents. Thus, care must be taken to consider the impacts on alternative routes as well as neighborhood access routes.

Advantages:
x Reduces traffic volume
x Maintains access for residents
x Reduces cut-through traffic
x Reduces crossing distance for pedestrians
x Landscaping possible
x OK for emergency vehicles
Disadvantages:
x May divert traffic to parallel streets
x May increase trip length for some residents
x 1-2 curbside parking spaces lost
Criteria:
x Local and collector streets of any width with 5,000 vehicles per day or less x Not on routes regularly used by emergency vehicles and on bus routes x Streets must have a speed limit of 35 mph or less
Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible Possible Possible Both Slight
Increase
$5,000-
$15,000
Possible
Problems
487
City of San Clemente
Traffic Calming Policy and Resource Manual
34 22. Diagonal Diverters
Diagonal road closures are closed to motor vehicles but traversable by pedestrians and bicyclists. A barrier placed diagonally across a four-legged intersection, interrupting traffic flow across the intersection.

Advantages:
x Reduces traffic speed
x Reduces traffic volumes
x Reduces cut-through traffic
x Self-enforcing
x Enhanced landscaping opportunities possible
Disadvantages:
x May reduce access for emergency vehicles
x Diversion to longer routes may cause inconvenience to and be opposed by affected residents x Not suitable on transit routes
x Landscape Maintenance costs
Criteria:
x Local streets of any width with 5,000 vehicles per day or less x Not on routes used regularly by emergency vehicles or on bus routes x Streets must have a speed limit of 35 mph or less
Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvements Yes Yes Both SmallIncrease
$25,000-
$50,000
Possible
Problems
488
City of San Clemente
Traffic Calming Policy and Resource Manual
35 23. Traversable Barriers
A Traversable Barrier is closed to motor vehicles but traversable by emergency vehicles.

A barrier placed across any portion of a street that is traversable by bikes, pedestrians, in-line skaters, and emergency vehicles, but not by motor vehicles.

Advantages:
x Reduces traffic volumes
x Allows two-way traffic in the remainder of the street x Provides space for landscaping
x Improves safety for all the street users
x Maintains pedestrian and bike access
Disadvantages:
x Reduces emergency vehicle access as they have to drive around barrier with care x Compliance with semi-diverters is not 100%
x Reduces access to properties for residents
x May increase trip length for some residents
x May be perceived as an inconvenience by some neighbors and an unwarranted restriction by the general public
x May increase traffic volumes on other streets
Criteria:
x Local street of any width with 5,000 vehicles per day or less x Street must have a speed limit of 30 mph or less
x Not on routes regularly used by emergency vehicles or on bus routes Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Improvement Yes Yes
Local &
Possible
Collector
Small
Increase
$20,000-
$40,000 No Effect
489
City of San Clemente
Traffic Calming Policy and Resource Manual
36 24. Street Closure or Cul-de-sac
Full street closures are barriers placed across street to completely close the street to throughtraffic, usually leaving only sidewalks open.

Advantages:
x Reduces traffic volumes
x Eliminates through traffic
x Reduces speed of the remaining vehicle
x Improves safety for all the street users
x Pedestrian and bike access maintained
Disadvantages:
x Requires legal procedures for closure
x Reduces emergency vehicle access
x Reduces access to properties for residents
x May be perceived as an inconvenience by some neighbors and an unwarranted restriction by the general public
x May increase traffic volumes on other streets
Criteria:
x Local streets of any width with 5,000 vehicles per day or less x Streets where few properties are accessed from the street Level of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Possible
Improvement Yes Yes Both NoEffect
$30,000-
$75,000
Possible
Problems
490
City of San Clemente
Traffic Calming Policy and Resource Manual
37 25. Turn Restriction/Prohibition Signs
Turn restrictions prohibit movements at designated intersections - often during specified peak hours. Full-time turn restrictions are not as effective. Compliance is a problem with un-enforced turn-restrictions with about 50% violation. Enforced restrictions have about 20% violations rates.

Like one-way streets, turn restrictions can result in inconvenience to residents by making access to some properties indirect, and they may affect emergency response times. However, they can be used effectively to control cut-through traffic.

Advantages:
x Can be used to prevent cut-through traffic
x Most effective if limited to peak hours
x Relatively low cost option
Disadvantages:
x May have enforcement problems
x May affect adjacent street intersections
x May cause inconvenience for residents and emergency response x More affective with active enforcement
Criteria:
x Local, collector and arterial streets
Levels of Effectiveness:

Safety Speed
Reduction
Volume
Reduction
Local or
Collector Pollution Cost Emergency Service
Unknown No Yes Both None $1,000-
$3,000 Yes
491
City of San Clemente
Traffic Calming Policy and Resource Manual
38 Sources:

TrafficCalming.org
ITE.org
Los Angeles County
San Jose Traffic Calming Toolkit, Nov. 2001
Collier County Neighborhood Traffic Management Program, City of Encinitas Neighborhood Traffic Management Program, April 2004 492

Page 1 of 3 ends
← All documents from this meeting