Cities Index.
Agenda packet, regular meeting, third session

San Clemente City Council
June 6, 2023

Document
Agenda packet, regular meeting, third session
Meeting
June 6, 2023
Body
San Clemente City Council
Pages
22
Original file
52.4 MB
Text extracted from the city's file for reading and search. Open the original on ca-sanclemente.civicplus.com. That file is the official record.

LOCAL SIGNAL SYNCHRONIZATION PLAN CONSISTENCY REVIEW CHECKLIST The Local Agency Name: _City of San Clemente__________ Plan Date: __ _ Local Agency Statement Page #s in LSSP Provided or
N/A

1. Signal synchronization goals of the agency are consistent with those outlined as part of the Regional Traffic Signal Synchronization Master Plan.

Pages 3 – 5 Provided

2. Traffic signal synchronization street routes are identified, including all corridors along the regional signal
synchronization network located within the local agency.

Pages 6 – 7 Provided

3. Traffic signal inventory for all traffic signal synchronization street routes. Pages 8 – 11 Provided

4. Three-year plan separately showing costs, available
funding, and phasing for capital, operations, and
maintenance of signal synchronization along the traffic signal synchronization street routes and traffic signals which may include unconstrained and build-out scenarios.

Pages 12 – 15 Provided

5. Signal synchronization review, revision, and assessment of synchronization activities along the traffic signal
synchronization street routes and traffic signals.

Pages 16 - 22 Provided
I certify that the above statements are true to the best of my knowledge. ___________________________________________________ _________________ Signature Date
Kiel Koger, Public Works Director/City Engineer
_____________________________________________________________________ Printed Name, Title
ATTACHMENT 6
208

Page 2 ends

LOCAL SIGNAL SYNCHRONIZATION PLAN
(LSSP)
June 2023
209

Page 3 ends

SECTION ONE

TRAFFIC SIGNAL SYNCHRONIZATION GOALS, POLICIES AND

OBJECTIVES
210

Page 4 ends

Traffic Signal Synchronization Goals, Policies and Objective The City of San Clemente aligns with the Measure M2 Regional Traffic Signal Synchronization Program goals, which promote a collaborative, corridor-based approach that improves the performance of traffic signals based on existing traffic patterns. The City supports the local agency's responsibility for control of signal timing and working with neighboring agencies to develop adequate signal synchronization timing.

Signal Synchronization is an economical way to decrease overall stops, travel delays, and traffic-related congestion across city boundaries. This Local Signal Synchronization Plan (LSSP) defines specific goals, routes, and equipment required to ensure network operability with maximum traffic management efficiency. Goals for the City of San Clemente’s signal synchronization include:
x Create a balanced transportation network that provides mobility and access for all modes of travel, including motor vehicles, transit, bicyclists, pedestrians, and rail traffic.
x Provide an efficient and effective transportation circulation system. x Work cooperatively with the Orange County Transportation Authority (OCTA), Caltrans, and neighboring agencies to synchronize traffic signals throughout Orange County on a corridor basis to improve travel time and reduce stops. x Continue to coordinate with neighboring agencies in the development of multiagency synchronization timing and compatible traffic signal timing technical parameters.
x Maintain local control responsibility for signals within the City’s jurisdiction and control.
x Improve traffic flow in San Clemente by developing and implementing optimized traffic signal synchronization.
x Optimize signal timing to provide drivers better travel experience through reduced travel times, reduced stops, and reduced delays. x The strategies for signal synchronization will facilitate consistent operating speeds along the key corridors and provide a good level of public perception. x Participate in Project P Traffic Forums.
x Review and revise signal timing, when necessary, along traffic signal synchronization routes.
x Provide ongoing maintenance and operation through a) monitoring and improving optimized signal timing and b) communications and detection support. x Identify future signal corridor improvements by recommending system and equipment enhancements to improve traffic flow and signal synchronization. x Lead additional signal timing synchronization projects through Project P for planned (candidate) corridors.
x Complete upcoming signal synchronization projects and develop final reports for the signal synchronization projects within six months of completion to include findings and an assessment of the performance of synchronization activities. 211

Page 5 ends

The City of San Clemente has collaborated with OCTA, Caltrans, and Dana Point to optimize the signal timing synchronization for two primary corridors (Avenida Pico and El Camino Real/Pacific Coast Highway) and three local corridors (Avenida Vista Hermosa, Camino De Los Mares/Camino De Estrella, and Camino Vera Cruz) as part of Project P and the Regional Traffic Signal Synchronization Master Plan. These projects involved replacing the existing traffic signal controllers with Intelight X3 Type ATC controllers that the City can remotely monitor and manage using MaxView software at the Engineering Building and the Public Works Maintenance Facility. The projects also developed synchronized timing plans for multiple peak periods based on the current traffic patterns and road configurations. The projects considered the impact of crossstreet traffic and special traffic generators such as schools and businesses. These projects aimed to provide state-of-practice intersection control and communication along the signal synchronization corridors.

The projects under consideration (including candidate Project P) seek the efficiency of traffic flow and the enhancement of the signal system security. The Traffic Management Software and Server Upgrades project includes upgrading the traffic management software with Kinetic Signals and replacing the server with the latest technology. The Avenida Palizada and El Camino Real project intents to improve the traffic flow and reduce delays by coordinating the traffic signal along the roadway segments. The Avenida Talega, Avenida Saluda, and Avenida La Pata projects involve updating the detection system using radar or thermal technology and switching the signal interconnection from copper to fiber.
212

Page 6 ends

SECTION TWO

TRAFFIC SIGNAL SYNCHRONIZATION STREET ROUTES
(EXISTING AND PLANNED)

213
214
CITYOF-~CN'ISl,w,0
LEGEND:
§ - SIGNALS CURRENTLY INTERCONNECTED
• - NON-INTERCONNECT TRAFFIC SIGNAL
@ -CAL TRANS TRAFFIC SIGNAL
■ ■ ■ -REGIONAL SIGNAL SYNCHRONIZATION NETWORK
- - FUTURE LOCAL SIGNAL SYNCHRONIZATION
~ -0
ui
1ii
C:
_g>
V,
0 !E
i
.,
i
{
..

E
ill
..
.D
0 !E
~
15 !E
~
~ C>
·1
-0 1---------,--------------...... ------------...... -----------1 6,

CITY OF SAN CLEMENTE
910 Calle N~gocio San Clemente, CA 92763
https:/ /www .san-clemente.org
C:
., 2023 LSSP UPDATE -o
t--------------------------tB

TRAFFIC SIGNAL SYNCHRONIZATION

STREET ROUTES
::,
.!l!
-0 o,
~
:c
a.
~
9' Page 7 __________________ __,e>

Page 8 ends

SECTION THREE

TRAFFIC CONTROL INVENTORY

215
Traffic Synchronization Inventory
Corridor Cross Street Intersection AM MID PM WKND
Maintenance
Responsibility Cabinet Type Software Detection
Bike
Detection CCTV
Power
Backup Comm Other ITS ATMS Status
Avenida Pico El Camino Real (33) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Fiber N/A Maxview Online Agua Nueva (18) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineAvenida Vista Hermosa West (17) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview Online Calle De Los Molinos (16) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle De Industrias (15) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineI-5 SB Ramp 110/120 80 100 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite Offline I-5 NB Ramp 80-120 100 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineHigh School Entrance (14) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineTriton Way (13) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineAvenida Presidio/Calle Frontera (12) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineGateway Plaza (11) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle Del Cerro (10) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle Amanecer (9) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCamino Vera Cruz (8) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlinePlaza Pacifica West (7) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlinePlaza Pacifica East (6) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineAvenida La Pata (5) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCourtyards (4) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineAvenida Vista Hermosa East (3) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCalle Alicante (2) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCamino Celosia (1) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online El Camino Real/
Pacific Coast Highway Camino Capistrano (30) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Fiber N/A Maxview Online Camino San Clemente (31) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Wireless N/A Maxview OnlineAvenida Estacion (32) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Wireless N/A Maxview OnlineAvenida Pico (33) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Fiber N/A Maxview OnlineCalle De Los Molinos (34) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineEl Portal (35) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineMariposa (36) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Palizada (37) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Fiber N/A Maxview OnlineAvenida Del Mar (38) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineAvenida Victoria (39) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Presidio (40) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Barcelona (41) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineI-5 SB Off-Ramp/Avenida Valencia 80 80 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite Offline I-5 NB Off-Ramp 80 80 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite Offline E. Avenida San Juan 80 80 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite Offline Avenida San Gabriel (42) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineI-5 NB Ramp 100 100 100 100 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite Offline Avenida Mendocino (43) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Wireless N/A Maxview OnlineAvenida San Luis Rey (44) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview Online Cycle Length Equipment
San Clemente - 2023 LSSP Inventory_2023_Submittal.xlsx Page 9 216
e
Traffic Synchronization Inventory
Corridor Cross Street Intersection AM MID PM WKND
Maintenance
Responsibility Cabinet Type Software Detection
Bike
Detection CCTV
Power
Backup Comm Other ITS ATMS Status
Cycle Length Equipment
Camino De Los Mares/Camino De Estrella Camino Mira Costa (100) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Avenida Las Palmas (99) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineFreeway I-5 SB Ramp Free Free Free Free Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite Offline Freeway I-5 NB Ramp Free Free Free Free Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineCamino El Molino (98) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCalle Agua (97) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineOcean View Plaza (96) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineHospital Entrance (95) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineMarbella (94) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineAvenida Vaquero (93) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCalle Nuevo (92) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlinePortico Del Sur (91) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCamino Vera Cruz (90) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Avenida Vista Hermosa W. Avenida Pico (17) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview Online Via Cannon Verde (72) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineOutlets at San Clemente (71) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Costa Azul (70) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlinePark/School Access (69) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops Yes N/A BBS Fiber N/A Maxview OnlineI-5 SB Ramp 120 120 120 90 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite Offline I-5 NB Ramp 120 120 120 90 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineCalle Frontera (68) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCamino Laurel (67) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineVia Turqueza (66) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCamino Vera Cruz (65) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineTarget/Sports Park (64) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida La Pata (63) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineVia Suerte (62) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineAvenida Talega (61) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCamino La Pedriza (60) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineE. Avenida Pico (3) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Camino Vera Cruz Avenida Pico (8) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Plaza Pacifica (167) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineVia Pacifica (168) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle Paradiso (169) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview Online Calle Sarmentoso (170) 80 80 80 80 San Clemente P (TS2 Type 2) MaxTime MaxTime Radar No N/A BBS Wireless N/A Maxview OnlineCosta (173) 80 80 80 80 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Wireless N/A Maxview OnlineColina Rodante/Montana Del Sol (171) 80 80 80 80 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle De Los Arboles/Camino De La Ladera (172) 80 80 80 80 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview Online Camino De Los Mares (90) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Avenida La Pata Calle Amanecer (164) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Traffix Devices (163) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCamino Del Rio (157) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview Online San Clemente - 2023 LSSP Inventory_2023_Submittal.xlsx Page 10 217
e
Traffic Synchronization Inventory
Corridor Cross Street Intersection AM MID PM WKND
Maintenance
Responsibility Cabinet Type Software Detection
Bike
Detection CCTV
Power
Backup Comm Other ITS ATMS Status
Cycle Length Equipment
Fire Station #59 (162) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCalle Saluda (156) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview Online Avenida Talega Calle Careyes East/Camino Viento Fuerte (158) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Copper N/A Maxview Online Calle Careyes West/Camino Viento Fuerte (159) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Copper N/A Maxview Online Calle Portofino (161) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Calle Saluda (160) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview Online Calle Saluda Avenida Fresas/Via Catarina (152) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCalle Saluda Liberty Park (153) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineAvenida Del Mar Ola Vista (165) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineAvenida Del Presidente Concordia Elementary School (166) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineAvenida Vaquero Via Cascadita (151) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineAvenida Palizada Avenida de la Estrella (45) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineCalle Amanacer Calle Negocio (155) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCalle Del Cerro Avenida Vista Montana (154) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCamino Capistrano Avenida Vaquero (151) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview Online -- Synchronized Corridor-- Stand-alone Signalized Intersection -- Updated Change San Clemente - 2023 LSSP Inventory_2023_Submittal.xlsx Page 11 218
e

Page 12 ends

SECTION FOUR

TRAFFIC SIGNAL SYNCHRONIZATION SYSTEM AND THREE

YEAR PLAN

219

Page 13 ends

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Constrained)
Reporting Jurisdiction Expenditures: City of San Clemente _

MAINTENANCE
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Communication and Software Maintenance $1,200 $1,200 $1,200 $3,600 City Staff time (Engineering) $5,200 $5,200 $5,200 $15,600 City Staff time (Maintenance) $3,000 $3,000 $3,000 $9,000 Subtotal Maintenance $9,400 $9,400 $9,400 $28,200

CONSTRUCTION
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Citywide Signal Synchronization $0 $0 $0 $0
Subtotal Construction $0 $0 $0 $0

OPERATIONS
Citywide Signal Timing Maintenance FY23/24 FY24/25 FY25/26 TOTAL Consultant Fees $0 $0 $0 $0
City Staff time (Engineering) $12,500 $12,500 $12,500 $38,750 City Staff time (Maintenance) $6,050 $6,050 $6,050 $18,150 Subtotal Operations $18,550 $18,550 $18,550 $55,650
FY Total $27,950 $27,950 $27,950 $83,850

220

Page 14 ends

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Unconstrained) Reporting Jurisdiction Expenditures: City of San Clemente _

MAINTENANCE
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Communication and Software
Maintenance (maintenance by system's
vendor)
$12,650 $12,650 $25,300
City Staff time (Engineering) $6,765 $6,765 $6,765 $20,295 City Staff time (Maintenance) $6,655 $6,655 $6,655 $19,965 Subtotal Maintenance $13,420 $26,070 $26,070 $65,560

CONSTRUCTION
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Traffic Management Software and Server
Upgrades $22,000 $22,000
Avenida Palizada and El Camino Real $24,000 $100,000 $124,000 Avenida Talega and Avenida Saluda $350,000 $350,000
Avenida La Pata $300,000 $300,000
Subtotal Construction $46,000 $450,000 $300,000 $796,000

OPERATIONS
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Consultant Fees for project management
and technical support. $55,000 $22,000 $22,000 $99,000
City Staff time (Engineering) $13,530 $13,530 $13,530 $40,590 City Staff time (Maintenance) $6,655 $6,655 $6,655 $19,965 Subtotal Operations $75,185 $42,185 $42,185 $159,555
FY Total $134,605 $518,255 $368,255 $1,021,115

221

Page 15 ends

LSSP IMPLEMENTATION – CANDIDATE SIGNAL

SYNCHORNIZATION PROJECTS WITH ESTIMATED COSTS

TO COMPLETE PLANNED NETWORK
Reporting Jurisdiction Expenditures: City of San Clemente

CORRIDOR IMPROVEMENT SUMMARY ESTIMATED
COST
Traffic Management
Software and Server
Upgrades
Upgrade Advanced Traffic Management
Software from MaxView to Kinetic Signals,
and Server.
$22,000
Avenida Palizada and El
Camino Real
Synchronize signal timing along Avenida
Palizada and El Camino Real. $124,000
Avenida Talega and
Avenida Saluda
Update detection system using possibly
radar or thermal technology; Upgrade signal
Interconnect from copper to fiber.
$350,000
Avenida La Pata
Update detection system using possibly
radar or thermal technology; Upgrade signal
Interconnect from copper to fiber.
$300,000
Total Estimated Cost $796,000

222

Page 16 ends

SECTION FIVE

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT

REVIEW AND REVISE, AS MAY BE NECESSARY, THE TIMING

OF TRAFFIC SIGNALS
Significant timing plan updates and projects completed FY 2020/2021 through 2022/2023

223

Page 17 ends

Signal Synchronization Timing Review, Revision, and Assessment To accommodate the new bell schedule of San Clemente High School, the City extended the traffic signal Day Plan 1 from 15:15 to 15:50 for the five (5) Avenida Pico intersections at Calle Del Cerro, Gateway Plaza, Avenida Presidio/Calle Frontera, Triton Way, and High School Entrance on August 15, 2023.

The City of San Clemente will update timing plans periodically. On-going maintenance and operation will be provided by monitoring and improving optimized signal timing through communications and detection support. 224

Page 18 ends

TRAFFIC SIGNAL SYNCHRONIZATION REVISION

LOCAL AGENCY

CORRIDOR
TIMING

REVIEWED
(Past 3 Years)

DID TIMING

REQUIRE
AN
UPDATE?
TIMING UPDATE RESULTS (if available)
Speed Travel Stops per mile Greens per red CSPI Score*
Before After Before After Before After Before After
Avenida Pico 2022 Yes Studies not yet available.

The City extended the traffic signal Day Plan 1 from 15:15 to 15:50 for the five (5) Avenida Pico intersections at Calle Del Cerro, Gateway Plaza, Avenida Presidio/Calle Frontera, Triton Way, and High School Entrance on August 15, 2023. 225
Index Name Limit Average Score Green/Stop Score # of Stop per Mile Score Score Level Emissions Rate (g/mi) Emission Level AM 29.6 29.4 4.2 33.8 2.1 19.2 82.5 I 30.0 332.5 1
MD 26.3 24.4 3.9 31.2 2.6 17.0 72.6 II 26.0 364.8 1
PM 28.9 28.4 4.0 31.8 2.3 17.1 77.4 II 29.0 339.4 1
Average 28.3 27.4 4.0 32.3 2.3 17.0 76.7 II 28.0 347.1 1 AM 28.3 27.5 3.4 27.1 1.2 28.0 82.6 I 28.0 347.1 1
MD 27.7 26.5 2.8 22.1 1.3 26.9 75.6 II 28.0 347.1 1
PM 26.3 24.4 2.7 21.6 1.3 26.9 72.9 II 26.0 364.8 1
Average 27.4 26.1 3.0 23.6 1.3 27.3 77.0 II 27.0 355.5 1 AM 27.3 26.0 4.5 35.8 2.1 19.0 80.8 I 27.0 355.5 1
MD 26.3 24.4 3.8 30.6 2.1 18.5 73.5 II 26.0 364.8 1
PM 26.2 24.2 4.1 32.9 2.1 18.8 75.9 II 26.0 364.8 1
Average 26.6 24.9 4.1 33.1 2.1 18.8 76.7 II 27.0 355.5 1 AM 22.0 18.0 3.1 24.8 1.9 20.9 63.7 III 22.0 410.3 2
MD 25.1 22.7 2.5 19.7 2.1 19.2 61.5 III 25.0 374.8 1
PM 25.8 23.7 2.4 19.0 2.2 18.2 60.9 III 26.0 364.8 1
Average 24.3 21.4 2.6 21.2 2.1 19.4 62.0 III 24.0 385.8 1

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT
(Source: 2021 Orange County Corridor Performance)
Roadway Distance
(mi) Peak Hour
Speed Green/Stop # of Stop per Mile CSPI CO2 Emission Rounded Speed
C71C70
PCH Coast Hway/El Camino RealAvenida PicoAvenida Vista HermosaCamino De Los Mares C90A
C72
1 to 61 to 41 to 31 to 2

6.74.32.92.5

Page 19 ends

226
Index Name Limit 2021 CV 2011 FC 2021 CV 2011 FC 2021 CV 2011 FC Improve or Degrade C70 Camino De Los Mares 1 to 2 2.5 28.3 30.1 4.0 2.3 2.3 1.0 76.7 II 78.3 II Degraded Value in Same TierC71 Avenida Vista Hermosa 1 to 3 2.9 27.4 26.1 3.0 1.5 1.3 1.2 77.0 II 63.8 III Improved TierC72 Avenida Pico 1 to 4 4.3 26.6 28.9 4.1 2.7 2.1 1.2 76.7 II 78.3 II Degraded Value in Same Tier C90A PCH Coast Hway/El Camino Real 1 to 6 6.7 24.3 29.1 2.6 2.1 2.1 0.9 62.0 III 75.7 II Degraded Tier 2021 CV 2011 FC
CSPI

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT
(Source: 2021 CV vs 2011 FC Orange County Corridor Performance - AM/MD/PM Average) Roadway Distance
(mi)
Speed Green/Stop # of Stop per Mile

Page 20 ends

227
Index Name Limit 2021 CV 2019 FC 2021 CV 2019 FC 2021 CV 2019 FC Improve or Degrade C70 Camino De Los Mares 1 to 2 2.5 28.3 30.1 4.0 2.3 2.3 1.0 76.7 II 78.3 II Degraded Value in Same TierC71 Avenida Vista Hermosa 1 to 3 2.9 27.4 26.1 3.0 1.5 1.3 1.2 77.0 II 63.8 III Improved TierC72 Avenida Pico 1 to 4 4.3 26.6 28.9 4.1 2.7 2.1 1.2 76.7 II 78.3 II Degraded Value in Same Tier C90A PCH Coast Hway/El Camino Real 1 to 6 6.7 24.3 24.3 2.6 2.0 2.1 1.0 62.0 III 71.1 II Degraded Tier

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT
(Source: 2021 CV vs 2019 FC Orange County Corridor Performance - AM/MD/PM Average) Roadway Distance
(mi)
Speed Green/Stop # of Stop per Mile CSPI
2021 CV 2019 FC

Page 21 ends

228

 







 

 
 




 


 




 









  







 













 





  







 

























 !" #$#


%&'()
**+,%'($%*'-.,


/
/
%$0
(1#
('
) - '$


/+*2 3$#/
4
5-.,

          
      
    

  
  
    

*"+3

6($(3"++ '$(#*7
1$ -8 +
5) (# 39 3:;%$9
1+%*+$*

())7*++*2 3$#<)%&%8) 7*+7"',%'&"1*'3*-1) $%*'1 + "%, )%' #

*++%,*+
0'39+*'%=($%*' +7*+-('3 
', .

"++ '$)0"', ,
*++%,*+<)%&%8) 
*++%,*+
% +
% +

% +

% +

% +

 ##$9('>
>
$*?
?
5 @$*A
A
5 @$*B

*+ $9('B

@
5>

%) #


*++%,*+1 +($%*'() +7*+-('3
('
) - '$

Page 22 ends

229
\ 'C
I 11
I /'/
" I I
fl
'I
r ,s-·,
I
I

I I I I
I I

AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 7J
Department: Finance and Administrative Services
Prepared By Jacob Rahn, Financial Services Officer
Subject:

ESTABLISHING APPROPRIATIONS LIMIT FOR FISCAL YEAR (FY) 2023-24 Summary:

The California Constitution limits the amount an individual city can budget (appropriate) from tax revenue proceeds each year. This limit, called an “appropriations limit”, is calculated by each City annually and must be established via a formal resolution of the City’s governing body. For FY 2023- 24 the City of San Clemente’s calculated appropriations limit is $113,657,914. The amount the City is budgeting from proceeds of taxes for FY 2023-24 is well below that limit.

Background:

Article XIII B of the California Constitution specifies that cities annually establish an appropriations limit by formal resolution of the City’s governing body. Article XIII B further specifies this limit may increase annually by a factor comprised of the changes in population for the City or the County (whichever is higher), combined with either the change in California per capita personal income or the change in the local assessment roll due to nonresidential construction. The State Department of Finance transmits an estimate of the percentage change in population to local governments annually, per California Revenue and Taxation Code Section 2227. This information is used to establish the FY 2023-24 appropriations limit.

The calculation of San Clemente’s appropriation limit for FY 2023-24 Appropriations Limit is presented on the Exhibits attached to this report. For the FY 2023-24 calculation, the annual adjustment factor is based on population change for the City of San Clemente and the change in California per capita income. Using these in the calculation results in an overall increase in the appropriations limit of $4,493,466 for a total of $113,657,914. The budgeted proceeds of taxes total $61,698,135, which represents 54% of the amount the City is entitled to appropriate for FY 2023-24.

Council Options:
· Adoption Resolution No. 23-40 approving the Appropriations Limit. · Continue the item with direction to staff to provide additional information. · Deny Resolution No. 23-40 and the Appropriations Limit.

Fiscal Impact:

None.

CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 7J
Environmental Review/Analysis:

Not applicable.

Recommended Actions:

Staff Recommendation

1. Adopt Resolution No. 23-40 entitled: A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SAN CLEMENTE, CALIFORNIA, ESTABLISHING AN APPROPRIATIONS LIMIT PURSUANT TO ARTICLE XIIIB OF THE CALIFORNIA CONSTITUTION.

Attachment:

1. Resolution No. 23-40

2. Exhibit I - Appropriations Limit Computation for Fiscal Year 2023-24 Notification:

None
CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/1/2023
powered by Legistar™ 2
4878-5281-9047 v1
Attachment 1
RESOLUTION NO. 23-40

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SAN CLEMENTE, CALIFORNIA, ESTABLISHING AN

APPROPRIATIONS LIMIT (GANN LIMIT) PURSUANT

TO ARTICLE XIIIB OF THE CALIFORNIA

CONSTITUTION
WHEREAS, Article XIIIB of the California Constitution provides that the total annual appropriations subject to limitation of each government entity, including this City, shall not exceed the appropriations limit of such government entity for the prior year adjusted for changes in the local assessment roll for non-residential construction or personal income and population, except as otherwise provided in said Article XIIIB and implementing State Statutes; and
WHEREAS, pursuant to Article XIIIB of the California Constitution, and Section 7900 et seq. of the California Government Code, the City is required to establish its annual appropriations limit; and
WHEREAS, the City of San Clemente has calculated and determined that the appropriations limit be established in the amount of $113,657,914 for the Fiscal Year 2023-24 (the “Appropriations Limit”); and
WHEREAS, required by Government Code section 7910(a), documentation used in the determination of the Appropriations Limit and other necessary determinations were available to the public at least fifteen (15) days prior to the June 6, 2023 council meeting when this Resolution was considered.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:

Section 1. That the foregoing recitals are true and correct and incorporated herein.

Section 2. That the City Council of the City of San Clemente, California finds that the Fiscal Year 2023-24 Appropriations Limit in the amount of $113,657,914 is hereby established for said Fiscal Year 2023-24.

Section 3. That all supporting documentation used in the determination of the Appropriations Limit shall be made available at the City Finance offices during normal business hours for the personal inspection of the public.

Section 4. That the City Clerk shall certify to the passage and adoption of this 3 Resolution No. 23-40 Page 2
4878-5281-9047 v1
resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of June, 2023.

ATTEST:
___________________________ __________________________
City Clerk of the City of Mayor of the City of San
San Clemente, California Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, Laura Campagnolo, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-40 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of June, 2023, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of__________, ________. ________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
4 Exhibit I
City of San Clemente
Article XIII B: Appropriations Limit Computation
For The Fiscal Year 2023-24

1. Appropriations limit for FY 2022-23 $ 109,164,448 (1)

2. Annual Adjustment Factor
a. Per capita personal income change 4.44% (2)
b. Population change -0.31% (3)
(1.044 times 0.997) 1.04116236

3. FY 2023-24 limit times annual adjustment factor 113,657,914

4. Less FY 2022-23 excess user fees or other alterations 0

5. Appropriations Limit for FY 2023-24 113,657,914

6. FY 2023-24 proceeds from taxes 61,698,135

7. Margin $ 51,959,779
Notes:
(1) Established by Resolution 22-25
(2) Source is the State Department of Finance
(3) The higher of the City population change or the total County population change is used for this factor. For FY 2023-24, the City change exceeds the County. The difference in City population of 63,237 at 1/2023 and population of 63,431 at 1/2022 divided by 63,431 = -0.31%
Attachment 2
5 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 7K
Department: Public Works
Prepared By Fatana Temory, Management Analyst
Subject:

ADOPT RESOLUTION TO DESIGNATE FISCAL YEAR (FY) 2023-2024 STREET REHABILITATION PROJECTS PURSUANT TO SENATE BILL 1 (SB1) THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
Summary:

The proposed resolution designates the following projects to receive SB1 gas tax funds:
· Traffic Signal Cabinet and Pedestals Replacement
· As-Needed Sidewalk Improvements FY 2023
· Signalized Intersection Improvements
· Sidewalk Improvements -Avenida San Luis Rey, Avenida Santa Margarita, and East Avenida Magdalena
This resolution is required by SB1 funding requirements.

Background:

In April 2017 the Governor signed SB 1 titled “The Road Repair and Accountability Act of 2017” which provides funding to cities and counties for basic road maintenance, rehabilitation, and critical safety projects on the local streets and roads system. SB 1 increases per gallon fuel excise taxes, diesel fuel sales taxes and vehicle registration taxes, and provides inflationary adjustments to fuel tax rates in future years. Collected tax revenue is deposited into a new Road Maintenance and Rehabilitation Account (RMRA), and some of this new RMRA funding is apportioned by formula to eligible cities and counties. It is estimated that San Clemente will receive approximately $1,585,754 in RMRA funding in FY 2024. This revenue estimate has been incorporated into the proposed FY 2024 budget.

Discussion:

SB1 includes increased transparency and reporting requirements, including a requirement that projects proposed for SB1 funding must be designated by resolution. The proposed FY2024 CIP includes RMRA funding for the proposed projects listed in the resolution. Projects that have not been completed from previous years are required to be included in the FY2024 resolution. Projects will improve traffic signals, traffic signal controller cabinets and pedestals, and address public safety by creating accessible pedestrian routes in highly traveled area where sidewalk does not exist. The attached resolution is required by the State to formally designate SB1 gas tax funds to the project.

CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 7K
Council Options:
· Adopt Resolution to designate FY 2023-2024 Street Rehabilitation Projects pursuant to Senate Bill 1 (SB1) The Road Repair and Accountability Act of 2017. · Modify and adopt Resolution to designate FY 2023-2024 Street Rehabilitation Projects pursuant to Senate Bill 1 (SB1) The Road Repair and Accountability Act of 2017. · Continue the Item and direct staff to provide additional information.

Fiscal Impact:

Yes. The proposed resolution formally designates SB1 gas tax funds to the planned projects proposed in the FY 2024 Capital Improvement Program. It is estimated that the City will receive approximately $1,585,754 in SB 1 gas tax funds in FY 2024.

Environmental Review/Analysis:

Staff recommends that the City Council determine this project to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR Section 15301), and Class 2 (Replacement or Reconstruction, 14 CCR section 15302) of the State CEQA Guidelines.

Recommended Actions:

Staff Recommendation
Adopt Resolution No. 23-41 entitled A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CLEMENTE ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2023-2024 FUNDED BY SENATE BILL 1 (SB 1): THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017.

Attachment:

1. Resolution No. 23-41
Notification:

None.

CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/1/2023
powered by Legistar™ 2
ATTACHMENT 1
RESOLUTION NO. 23-41

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE ADOPTING A LIST OF PROJECTS FOR
FISCAL YEAR 2023-2024 FUNDED BY SENATE BILL 1 (SB
1): THE ROAD REPAIR AND ACCOUNTABILITY ACT OF
2017 AND DETERMINING THAT THE TRAFFIC SIGNAL

CABINET AND PEDESTALS REPLACEMENT PROJECT IS

CATEGORICALLY EXEMPT FROM THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT (CEQA) UNDER CLASS
2 OF THE STATE CEQA GUIDELINES SECTION 15302
(REPLACEMENT OR RECONSTRUCTION, 14 CCR
SECTION 15302)
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of San Clemente must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of San Clemente, will receive an estimated $1,585,754 in RMRA funding in Fiscal Year 2023-24 from SB 1; and
WHEREAS, this is the seventh year in which the City of San Clemente is receiving SB 1 funding, which will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City of San Clemente has undergone a robust public process to ensure public input into our community’s transportation priorities and the project list; and 3 Resolution No. 23-41 Page 2
4874-4977-2903 v1
WHEREAS, the City of San Clemente determined areas lacking appropriate pedestrian routes in highly traveled areas to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City of San Clemente maintain and rehabilitate arterial streets/roads and sidewalks throughout the City of San Clemente this year and into the future; and
WHEREAS, the 2020 California Statewide Local Streets and Roads Needs Assessment found that the City of San Clemente’s streets and roads are in an overall good condition and this revenue will help the City maintain the overall quality of its road system and associated signalized intersection infrastructure; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.

NOW, THEREFORE IT IS HEREBY RESOLVED, FOUND AND DETERMINED by the City Council of the City of San Clemente, State of California, as follows:

SECTION 1:Incorporation of Recitals.

The City Council hereby finds that all of the facts in the Recitals above are true and correct and are incorporated and adopted as fully set forth in this resolution.

SECTION 2:CEQA Findings.

Based upon its review of the entire records, including the Staff Report, any public comments or testimony presented to the City Council, the City Council hereby finds and determines that the Traffic Signal Cabinet and Pedestals Replacement project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines Section 15302 (Class 2: Replacement or Reconstruction) because the project consists of consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced and there is no possibility that the project will have a direct or reasonably foreseeable indirect effect on the environment. 4 Resolution No. 23-41 Page 3
4874-4977-2903 v1
Section 3: The following list of newly proposed projects are hereby designated to be funded in part or solely with Fiscal Year 2023-24 Road Maintenance and Rehabilitation Account revenues:

Project Title: Traffic Signal Cabinet and Pedestals Replacement Project Project Description: This project will replace damaged and/or deteriorated traffic signal controller cabinets and pedestals, as needed.

Project Location: Citywide
Estimated Project Schedule: Start: December 2023 – Completion: June 2024 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 Years
Section 4: The following previously proposed and adopted projects may also utilize Fiscal Year 2023-24 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of San Clemente is reaffirming to the public and the State its intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:

Project Title: Sidewalk Improvements –Avenida San Luis Rey, Avenida Santa Margarita, and East Avenida Magdalena
Project Description: This project consists of construction of sidewalk and access ramps on Avenida San Luis Rey, Avenida Santa Margarita, and East Avenida Magdalena. Sidewalk installation should increase public safety and create accessible pedestrian routes in a highly traveled area where sidewalk does not exist. Due to the lack of available street right of way, sidewalk would be built along the City's golf course frontage.

Project Location: Avenida San Luis Rey, Avenida Santa Margarita, and East Avenida Magdalena
Estimated Project Schedule: Start: January 2024 – Completion: June 2024 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 years
Project Title: As-Needed Sidewalk Improvements FY 2023
Project Description: This sidewalk improvement project will include creating sidewalk in areas where gaps exist in order to help create a continuous sidewalk along blocks of highly traveled streets. Street segments will include filling the missing gaps of sidewalk on South El Camino Real between Avenida Junipero and East Avenida Magdalena.

Project Location: South El Camino Real between Avenida Junipero and East Avenida Magdalena.
5 Resolution No. 23-41 Page 4
4874-4977-2903 v1
Estimated Project Schedule: Start: August 2023 – Completion: June 2024 based on the component being funded with RMRA funds.

Estimated Project Useful Life: 20 years
Project Title: Signalized Intersection Improvements
Project Description: Improve all signalized intersections by adding yellow reflective blackplates to all traffic signal heads and upgrade and replace aging internally illuminated street name signs, as well as converting detection systems from cameras to loops at selected intersections to improve system performance.

Project Location: Citywide
Estimated Project Schedule: Start: December 2023 – Completion: June 2024 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 Years
Section 5: The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this ____ day of June, 2023.

ATTEST:
_______________________________ _____________________________ City Clerk of the City of San Clemente, Mayor of the City of San Clemente, California California
6 Resolution No. 23-41 Page 5
4874-4977-2903 v1

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-41 was adopted at a regular meeting of the City Council of the City of San Clemente held on ______ day of June 2023, by the following vote:

AYES:

NOES:

ABSENT:
____________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
7 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 7L
Department: City Clerk
Prepared By Laura Campagnolo, City Clerk
Subject:

RECORDS DESTRUCTION
Summary:

Before the City Council is a resolution authorizing destruction of certain City records that have surpassed the City’s established retention requirements.

Background:

In accordance with State law, the City of San Clemente previously established a Records Retention Schedule that is consistent with State statutory requirements. Staff has determined that the records identified in the attached draft resolution have surpassed the City’s established retention requirements. Moreover, the City Attorney has determined that none of the records are needed for legal or operational purposes. Consequently, Staff is recommending that Council authorize the destruction of the City records identified in the proposed resolution. Subject to limited exceptions, a resolution adopted by City Council and the written consent of the City Attorney is required pursuant to Government Code section 34090 before records can be destroyed.

Council Options:
· Adopt Resolution No. 23-42, authorizing records destruction. · Modify and adopt Resolution No. 23-42.
· Continue the Item with direction given to staff.
· Deny Resolution No. 23-42.

Fiscal Impact:

None.

Environmental Review/Analysis:

Not a “project” under the California Environmental Quality Act.

Recommended Actions:

Staff recommends that the City Council adopt Resolution No. 23-42 entitled A RESOLUTION OF THE

CITY COUNCIL OF THE CITY OF SAN CLEMENTE, CALIFORNIA, AUTHORIZING THE DESTRUCTION OF CERTAIN CITY RECORDS AS PROVIDED BY SECTION 34090 OF THE GOVERNMENT CODE OF THE STATE OF CALIFORNIA.

CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 7L
Attachment:

1. Resolution No. 23-42

2. Records Destruction Request
Notification:

None
CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/1/2023
powered by Legistar™ 2
Attachment 1
4888-8489-4823 v1
RESOLUTION NO. 23-42

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, AUTHORIZING THE

DESTRUCTION OF CERTAIN CITY RECORDS AS
PROVIDED BY SECTION 34090 OF THE GOVERNMENT
CODE OF THE STATE OF CALIFORNIA.

WHEREAS, maintaining certain records is unnecessary after a certain period of time for the effective and efficient operation of the government of the City of San Clemente; and WHEREAS, Section 34090 of the Government Code of the State of California provides a procedure whereby a City record that has served its purpose and is no longer required may be destroyed.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:

Section 1. The records of the City of San Clemente as set forth in Exhibit A attached hereto and incorporated herein by this reference are hereby authorized to be destroyed as provided by Section 34090 of the Government Code of the State of California.

Section 2. The provisions of Section 1 above do not authorize the destruction of:
(a) Records affecting the title to real property or liens thereon. (b) Court Records.
(c) Records required to be kept by statute.
(d) Records less than two (2) years old.
(e) The minutes, ordinances, or resolutions of the City Council of the City of San Clemente or of any City Committee or Commission.

Section 3. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.
3 Resolution No. 23-42 Page 2
4888-8489-4823 v1
PASSED AND ADOPTED this _____ day of June, 2023.

ATTEST:
___________________________ __________________________
City Clerk of the City of Mayor of the City of
San Clemente, California San Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-42 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of June , 2023, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of June, 2023. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell City Attorney
4 Attachment 2
4865-1865-2007 v1

CITY OF SAN CLEMENTE

RECORDS DESTRUCTION REQUEST
DEPARTMENT: Beaches, Parks and Recreation

FILE DESCRIPTION DATE
RANGE

RETENTION

SCHEDULE

ELIGIBLE

DESTROY
DATE
Winter Registration 2019 2019 CL+2 years 2022
2017 Scholarship; Winter Registration 2019 2017; 2019 CL+2 years 2022 SCAC Sign In 2016-2017 2016-2017 CL+2 years 2020
Summer 2019 Registration Receipts 2018 CL+2 years 2022
Pool Sign In 2018; Spring Registration 2019 2018; 2019 CL+2 years 2022 2019 Rentals 2019 CY+2 years 2022
2019 Swim Sign In 2018; 2019 CL+2 years 2022
Registration Fall 2018 2018 CL+2 years 2021
2015; 2017 Pool Sign In 2015; 2017 CL+2 years 2020
Spring 2018 Registration 2018 CL+2 years 2021
Summer 2019 Registration 2019 CL+2 years 2022
2019 Reservations 2019 CY+2 years 2022
2018 Rental Contracts 2018 CY+2 years 2021
2019 Pool Sign In; Fall 2018 Registration Forms;
Lawn Bowling Waiver; Military Grant
2018; 2019 CL+2 years 2022
Events 2015-2017 2015-2017 CY+2 years 2020
Recreation Receipts 2015-2016 2015-2016 CL+2 years 2019 Employee Timesheets 2014-2015 2014-2015 CY+5 years 2020 2018 Scholarships; Fall 2019 Registration Forms 2018; 2019 CL+2 years 2021 2019 Pool Sign In 2019 CL+2 years 2021
2019 Scholarships 2019 CL+2 years 2021
2020 Pool Waivers, Pool Reservations 2020 CY+2 years 2022 Spring/Summer 2020 Registration; Golf 2020 CL+2 years 2022 2014 Incident/Damage Report 2014 Resolved+5 years 2019
2019 Pool Waivers 2019 CL+2 years 2021
______________________________________________________________________ Department Head Date
______________________________________________________________________ City Clerk Date
______________________________________________________________________ 5 Records Destruction Request 2
4865-1865-2007 v1
City Attorney Date
6 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 7M
Department: Public Works
Prepared By Masako Hennequin, Associate Civil Engineer
-------
Subject:

ACCEPTANCE AND NOTICE OF COMPLETION FOR SIDEWALK IMPROVEMENTS FOR AVENIDA CABRILLO (CDBG), PROJECT NO. 10317
Summary:

LC Paving and Sealing, Inc. has completed the construction contract within budget. The Resolution before City Council will accept the project and allow staff to record the notice of completion.

Background:

On February 15, 2022, the City Council awarded a construction contract to LC Paving and Sealing, Inc. for sidewalk improvements on the 100 and 200 blocks of Avenida Cabrillo as shown in the location map on Attachment 2. The work consisted of replacing sidewalk, curb and gutter, ADA ramps and driveways on the south side of Avenida Cabrillo. The retaining wall adjacent to the City Community Center parking lot was also replaced along with new landscaping and irrigation system.

The construction cost summary is as follows:

Construction Management and Inspection $24,547
Construction $702,050
Total Construction Cost $726,597
Council Options:
· Adopt Resolution No. 23-43.
· Modify and adopt Resolution No. 23-43.
· Continue the item with direction to provide additional information.

Fiscal Impact:

The total project (construction, management and inspections) was completed at a cost of $726,597.

The construction portion of the project cost $702,050, which was approximately $20,800 more than the original not to exceed contract amount of $681,231.88. The reasons for the overage were due to unforeseen conditions encountered during construction which required the removal of an old buried concrete slab and replacement of an aged irrigation system. These change orders were outside the original scope of work and could not have been predicted at the time of the original award.

CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 7M
Environmental Review/Analysis:

This project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 2 (Replacement or Reconstruction, 14 CCR section 15302) of the State CEQA Guidelines.

Recommended Actions:

Staff Recommendation
Adopt Resolution No. 23-43, which will:

1. Accept the Sidewalk Improvements for Avenida Cabrillo (CDBG), Project No. 10317 from the LC Paving and Sealing, Inc.;

2. Authorize the Public Works Director to execute and record the Notice of Completion for Sidewalk Improvements for Avenida Cabrillo (CDBG), Project No. 10317;

3. Authorize the City Clerk to release the Payment Bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the Contractor, LC Paving and Sealing, Inc.; and

4. Authorize the City Clerk to release the Performance Bond upon receipt of a Warranty Bond in the amount of 25% of the construction cost.

Attachment:

1. Resolution No. 23-43

2. Location Map

3. Notice of Completion

4. Staff Report Dated February 15, 2022 (without attachments) Notification:

None.

CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/1/2023
powered by Legistar™ 2
Attachment 1
RESOLUTION NO. 23-43

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SAN CLEMENTE, CALIFORNIA, ACCEPTING AS

COMPLETE THE SIDEWALK IMPROVEMENTS OF

AVENIDA CABRILLO (CDBG), AND AUTHORIZING

THE CITY CLERK TO FILE THE NOTICE OF

COMPLETION WITH THE COUNTY CLERK

RECORDER
WHEREAS, on February 15, 2022, the City Council authorized a construction contract with LC Paving and Sealing, Inc. (LC Paving) for certain improvements along Avenida Cabrillo, Project No. 10317 ; and
WHEREAS, the work consisted of replacing sidewalk, curb and gutter, ADA ramps and driveways on the south side of Avenida Cabrillo, along with the replacement of a retaining wall adjacent to the City Community Center with landscaping and irrigation replacement; and
WHEREAS, LC Paving has completed the work to the satisfaction of the Public Works Director.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolves as follows:

SECTION 1. That the above recitations are true and correct.

SECTION 2. That the City Council accepts as complete the improvements along Avenida Cabrillo (Project No. 10317).

SECTION 3. That the City Council authorizes the Public Works Director to execute and the City Clerk to record a Notice of Completion for the project.

SECTION 4. That the City Council authorizes the City Clerk to release the payment bond for this project 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the LC Paving and Sealing, Inc.

SECTION 5. That the City Council authorizes the City Clerk to release the performance bond for this project upon receipt of a Warranty Bond in the amount of 25% of the total construction cost.

SECTION 6. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions. 3 Resolution No. 23-43 Page 2
PASSED AND ADOPTED this _____ day of June, 2023.
_______________________
Mayor of the City of
San Clemente, California
ATTEST:
__________________________
CITY CLERK of the City of
San Clemente, California
4 Resolution No. 23-43 Page 3

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-43 was adopted at a regular meeting of the City Council of the City of San Clemente held on _______ day of June 2023, by the following vote:

AYES:

NOES:

ABSENT:
_______________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
5 POSA
UITA

CL SEVILLE

AVE PALIZADA LOMA LN

AVE SANTA BARBARA AVE MONTEREY

AVE DEL MAR AVE CABRILLO AVE GRANADA AVE VICTORIA AVE ROSA

AVE SERRA

OLA VISTA

AVE MIRAMAR

AVE VICTORIA AVE ROSA

EL CAMINO REAL
LLO

COMMUNITY CENTER/LIBRARY

AVE CABRILLO

C I T Y O F S A N C L E M E N T E
910 CL Negocio, Suite 100
San CLEMENTE, CA 92673
Tel (949) 361-6100
Fax (949) 361-8316

LOCATION MAP
i:\cd\engineering\secure\projects\pn 10317 - sidewalk cdbg (cabrillo)\06-admin reports\location map.dwg 1.27.2022 (ALLEY TO N. CALLE SEVILLE)
PROJECT No. 10317 6
- PROJECT LOCATION
ATTACHMENT 1

AVENIDA CABRILLO SIDEWALK

IMPROVEMENT PROJECT
Recording Requested By:

City of San Clemente
When Recorded, Mail To:

Public Works Department
City of San Clemente
910 Calle Negocio
San Clemente, CA 92673
Recorded for the benefit of the City of San
Clemente and exempt from recording fees
pursuant to Government Code Section 27383.

Space above this line is for Recorder’s Use Only

NOTICE OF COMPLETION
Notice is hereby given by the City of San Clemente, a Municipal Corporation, that a public work of improvement has been completed as follows:

1. Project title or description of work: Sidewalk Improvements for Avenida Cabrillo (CDBG), Project No. 10317.

2. Date of completion: April 5, 2023.

3. Street address or legal description of the project site: 100 Block and 200 Block of Avenida Cabrillo

4. Name of owner: City of San Clemente.

5. Interest or estate of owner: Public Facility; Owned in Fee.

6. Address of owner: 910 Calle Negocio, Suite 100, San Clemente, CA 92673

7. Name and address of contractor: L.C. Paving & Sealing, Inc., 620 Alpine Way, Escondido, CA 92029.

I am the Public Works Director / City Engineer for the City of San Clemente, a Municipal Corporation, the owner of the indicated interest or estate in the property described above.

I make this verification on behalf of the City of San Clemente. I have read this Notice of Completion and know its contents. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Executed on __________________________ in San Clemente, California. _________________________________
Kiel Koger, Public Works Director / City Engineer
City of San Clemente
7 8
Department:

Prepared By:

Subject:

AGENDA REPORT

SAN CLEMENTE CITY COUNCIL MEETING
Meeting Date: February 15, 2022
Public Works/ Engineering
Kiel Koger, Public Works Director/City Engineer
Agenda Item V \:\
Approvals:

City Manager ~ Ip
Dept. Head .7.,t--,.-
Attorney CJ
Finance ~UV

CONSTRUCTION CONTRACT AWARD TO LC PAVING AND SEALING FOR THE SIDEWALK IMPROVEMENTS FOR AVENIDA CABRILLO, PROJECT No. 10317
Fiscal Impact: Yes. The estimated total project costs of $820,000 is available primarily from CDBG funds with the remaining funds from the FY 2022 Street Improvement Fund, CIP Project No. 12305
Summary: Staff recommends that the City Council approve a construction contract with LC Paving and Sealing in an amount not to exceed $681,231 .88. The purpose of the project is to provide an American with Disabilities Act (ADA) compliant walkway a!ong the 100 and 200 Block of Avenida Cabrillo (Attachment 1). The project also includes replacing sidewalk, driveway approaches , curb/gutter, cross gutters and ADA ramps, retaining walls, utility relocations, drainage improvements and landscaping.

Background: The project is partially funded with Community Development Block Grant (CDBG) funds; therefore, public outreach meetings through the Planning Department helped identify the project location and limits. As a result, an ADA compliant sidewalk will be installed along the 100 and 200 Block of Avenida Cabrillo, from Calle Seville to west of N. El Camino Real where feasible. Some existing driveways, curb and gutter, and areas of sidewalk will be removed and replaced to create a uniformly ADA compliant walkway.

Discussion: Six electronic bids were opened on January 27, 2022 with costs ranging from $646, 172.40 to $1,220,917.50. The results are presented on the attached Bidder's Listing (Attachment 2). The first bid of $646,172.40 was not a complete bid and was determined to be non-responsive. The lowest responsive bidder was LC Paving and Sealing of Escondido, CA, with a total bid amount of $681,231 .88. Based on the low bid, the total estimated project cost is $820,000 as summarized below:

Project Budget Summary
Construction (rounded up)
Construction Management & Inspection (approx. 10%)
Project Contingency (approx. 10%)
Estimated Total Project Cost
Public Works Agenda Report
682,000
69,000
69,000
$820,000
2-15-22 I 6H-1
9 Agenda Report
Recommended

Page 2 ends

As required by City Policy and State Law, the Contractor will be required to provide performance and payment bonds simultaneously with execution of the construction contract. A warranty bond will also be required prior to City Council acceptance of the project. Project plans and specifications are on file in the City Clerk's office.

Action: STAFF RECOMMENDS THAT the City Council:

1. Approve the plans and specifications for the Sidewalk Improvements for Avenida Cabrillo, Project No. 10317; and

2. Approve and authorize the authorize the Public Works Director / City Engineer execute, Contract No. ___ , by and between the City of San Clemente and LC Paving and Sealing, providing for Sidewalk Improvements for Avenida Cabrillo, Project No. 10317, in the amount of $681,231 .88.

Attachments: 1. Location Map

2. Bidders List

3. Contract
Notification: None.
s:\cd\engineering\secure\admin\202212-15\2-15-22-5r.docx 2-15-22 I 6H-2

AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 7N
Department: Public Works
Prepared By Kiel Koger, Public Works Director/City Engineer Subject:

ADOPTION OF RESOLUTION NO. 23-30, APPROVING A LICENSE AGREEMENT WITH ABOUND

FOOD CARE FOR EMERGENCY MEAL STORAGE
Summary:

At its Regular meeting of May 16, 2023, Council requested staff provide additional information regarding the Abound Food Care Emergency Meal Storage Program, concerning where expiring food is donated, County oversight of the program and overall program protocol. This information has now been provided to Council for consideration.

City Council approval of the resolution would approve a five-year license agreement with Abound Food Care to install, maintain and operate one solar powered cold storage unit with solar panels in a material storage yard at the City’s Water Reclamation Plant at 380 Avenida Pico. The unit will store ready-to-eat meals for the purpose of providing meals to community members in times of disaster.

The unit will be placed on a concrete pad and will be self-contained with no need for any utilities.

Location of this emergency food storage unit was previously approved by the City Council at the November 1, 2022 Council meeting.

Background:

Founded in 2012, Abound Food Care’s mission is to provide solutions and facilitate collaboration with public, private, and non-profit sectors to guide and support the implementation of regional food care programs that optimize the supply chain to end hunger and food waste. Their Emergency Food Management Program enables local jurisdictions, state and federal agencies, emergency services, and community organizations to provide ready-to-eat, nutritious meals following an emergency and ensuring that citizens have access to food. The meals are intended for emergency use only. As expiration dates approach, the meals will be rotated out for disbursement to local non-profits. The first priority will be to work with San Clemente non-profits, but Abound Food Care will also work with surrounding city agencies for distribution to residents in need. Serving San Clemente residents in need will be the first priority.

As discussed in the November 1, 2022 agenda report, this project is within the Coastal Zone and would require Abound Food Care to apply for, and receive, approval from the California Coastal Commission. The activities permitted under the License Agreement are not allowed to occur until a Costal Development Permit or waiver is obtained.

Council Options:
· Adopt Resolution No. 23-30, approving the License Agreement with Abound Food Care.

CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/2/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 7N
· Modify and adopt Resolution No. 23-30, approving the License Agreement with Abound Food Care.
· Continue the Item and direct staff to provide additional information. · Do not adopt the resolution and deny the request to approve the License Agreement with Abound Food Care.

Fiscal Impact:

None.

Environmental Review/Analysis:

This project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures, 14 CCR Section 15303) under the State CEQA Guidelines at detailed in the November 1, 2022 agenda report.

Recommended Actions:

Staff Recommendation
Adopt Resolution No. 23-30, which would authorize the City Manager to sign the License Agreement between Abound Food Care and the City of San Clemente allowing the use of space in a material storage yard at the City’s Water Reclamation Plant at 380 Avenida Pico to place and operate one solar powered cold storage unit with solar panels.

Attachment:

1. License Agreement

2. Agenda Report from November 1, 2022 City Council meeting

3. Resolution 23-30
Notification:

None.

CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/2/2023
powered by Legistar™ 2
ATTACHMENT 1

LICENSE AGREEMENT

BY AND BETWEEN THE CITY OF SAN CLEMENTE,

AND ABOUND FOOD CARE FOR USE OF REAL PROPERTY

PARTIES AND DATE
This License Agreement (“Agreement”) is entered into as of __________, 2023 (“Effective Date”) by and between the City of San Clemente, a California municipal corporation (the “City”), the owners of real property at 380 Avenida Pico, and Abound Food Care, a California non-profit public benefit corporation, (the “Licensee”). The City and Licensee are sometimes hereinafter individually referred to as “Party” and hereinafter collectively referred to as the “Parties.”

RECITALS
A. The City owns that certain real property, generally located at 380 Avenida Pico, with accessor’s parcel numbers [691-433-01], in the City of San Clemente, County of Orange, State of California (the “Property”).

B. The Licensee wishes to place and operate one solar powered cold storage unit, with dimensions of approximately 40’ x 8’ x 10’ with solar panel extensions, to store ready-toheat-and-eat meals (“Storage Container”) as part of the Emergency Nutritious Food Management Program (“Program”) on the City Property, for the purpose of providing meals to community members in times of disaster. Specifically, Licensee desires to place the Storage Container on a portion of the City Property and to have access to such Storage Container by ingress and egress across the Property as identified in Exhibit A, which is attached hereto and incorporated herein by reference (“Licensed Property”); and C. Licensee’s Program will involve the storage of ready-to-heat-and-eat-meals in cold storage units provided by Licensee, which Licensee will rotate and replace in advance of product expiration, with excess meals provided by Licensee to local organizations serving community members faced with food insecurity; and
D. Placing Storage Container on the Licensed Property will increase the probability that otherwise food insecure families and individuals within the City of San Clemente will benefit from the Program and any meals obtained from the Storage Container, pursuant to Licensee’s policies and procedures; and
E. Licensee will be solely responsible for managing and distributing the meals pursuant to its own policies and procedures, with City having no involvement, discretion, liability, or role in managing or maintaining the Storage Container or Program; and F. City is willing to grant Licensee a license to access and place the Storage Container on the Licensed Property to operate the Program in accordance with the terms and conditions of this Agreement; and
G. City intends to provide Licensee with limited use of the Licensed Property pursuant to the terms of this Agreement, and in no way intends to grant property or easement rights to Licensee relating to the Licensed Property; and
3 55452.01400\31323399.1 2
4889-5985-2898 v4
H. The City desires to accommodate the Licensee’s request, subject to the terms and conditions set forth in this Agreement.

TERMS
Now therefore, in consideration of the mutual covenants and obligations of the Parties herein contained, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:

1. License.

1.1. Grant. The City hereby grants to the Licensee, and the Licensee’s representatives and agents, a revocable, non-transferable, non-exclusive license to access the Property for the limited purpose of conducting the Permitted Activities described in Section 3 (Permitted Activities) (the “License”). The Parties hereby acknowledge and agree that use of the Property by Licensee, as set forth in this Agreement, is with the consent of the City and shall be considered permissive.

1.2. No Transfer of Interest. Nothing in this Agreement shall be interpreted as, or otherwise deemed to be, a transfer or conveyance of any interest in the Property whatsoever between the City and the Licensee and the Licensee shall not claim any. The Parties hereby acknowledge and agree that nothing in the Agreement shall be interpreted as an agreement for the lease or other use of the Property by Licensee. This Agreement does not create any recordable interest and shall not be recorded in any official records.

2. Term. The term of this License shall commence on the Effective Date and shall, unless otherwise modified, continue for five (5) years unless the Agreement is extended by mutual agreement in writing or terminated by either Party without cause or penalty with 60 days written notice per Section 11 (Termination, Default, and Restoration).

3. Permitted Activities and Other Uses.

3.1. Permitted Activities. After obtaining all Required Approvals (as defined in Section 4.1 below), Licensee is authorized to conduct the following activities on the Property (“Permitted Activities”):

3.1.1. Place, access, operate, repair and maintain one solar powered cold storage unit, with dimensions of approximately 40’ x 8’ x 10’ with solar panel extensions, to store ready-to-heat-and-eat meals (“Storage Container”) as part of the Emergency Nutritious Food Management Program (“Program”) on the City Property, for the purpose of providing meals to community members in times of disaster. Licensee will be solely responsible for managing and distributing the meals pursuant to its own policies and procedures, with City having no involvement, discretion, liability, or role in managing or maintaining the Storage Container or Program. 4 55452.01400\31323399.1 3
4889-5985-2898 v4

3.2. Time. Except for passive operations and access to the Storage Containers to provide meals in response to an emergency, all Permitted Activities are limited to the time of 7 a.m. to 5 p.m. Monday through Friday.

3.3. Other Uses. The Licensee shall not use the Property for any other purposes whatsoever, except as authorized by subsequent written agreement signed by the City.

4. Required Approvals and Compliance.

4.1. Required Approvals. The use of the Licensed Property by the Licensee for Permitted Activities pursuant to this Agreement is subject to Licensee obtaining, at its sole cost and expense, and maintaining throughout the term of this License, all approvals and permits required by any federal, state, or local government agency, including a Coastal Development Permit or waiver thereof from the California Coastal Commission and the City Approvals listed in Section 4.2 (City Approvals) (“Required Approvals”).

4.2. City Approvals. The Licensee must apply for and obtain the following approvals from the City (“City Approvals”):

4.2.1. Required building permits for the proposed concrete foundation and Storage Container. A building permit will not be issued until Licensee has obtained a Coastal Development Permit or waiver thereof from the California Coastal Commission.

4.3. City Review. The City does not make any representation that it will issue or otherwise assist in the issuance of any Required Approvals. The City shall have no obligation or liability to verify whether Licensee has obtained all Required Approvals.

4.4. Compliance. The Licensee’s rights under this Agreement shall be conditioned upon, and Licensee shall, at its sole cost and expense, comply with each and every federal, state and local law, regulation, standard, court decision, ordinance, rule, code, order, decree, directive, guideline, permit and permit condition, together with any declaration of covenants, conditions and restrictions that are recorded in any official or public records with respect to the Property or any portion thereof, each as currently existing and as amended, enacted, issued or adopted from time to time, that are applicable to the Permitted Activities and the Property.

5. Standard of Performance. All Permitted Activities shall be performed in accordance with the highest standards and practices in the industry.

6. Hazardous Materials. The Licensee shall not under any circumstances store or bring onto the Property any Hazardous Materials. As used in this Agreement, the term “Hazardous Material” means any substance, material or waste which is (1) defined as a “hazardous 5 55452.01400\31323399.1 4
4889-5985-2898 v4
waste,” “hazardous material,” hazardous substance,” “extremely hazardous waste,” or “restricted hazardous waste” under any provision of California law; (2) petroleum or petroleum products; (3) asbestos; (4) polychlorinated biphenyls; (5) radioactive materials; (6) designated as a “hazardous substance” pursuant to Section 311 of the Clean Water Act, 33 U.S.C. section 1251 et seq. (33 U.S.C. §1321) or listed pursuant to Section 307 of the Clean Water Act (33 U.S.C. §1317); (7) defined as a “hazardous substance: pursuant to the Resource Conversation and Recover Act, 42 U.S.C. section 6901 et seq. (42 U.S.C. §6903) or its implementing regulations; (8) defined as a “hazardous substance” pursuant to Section 101 of the Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. section 9601 et seq. (42 U.S.C. §9601); or (9) determined by California, federal or local governmental authority to be capable of posing a risk of injury to health, safety or property.

7. No Duty to Warn. The City has no duty to inspect the Property and no duty to warn the Licensee or any person of any other latent or patent defect, condition or risk that might be incurred in entering the Property. The Licensee has inspected or will inspect the Property and hereby accepts the condition of the Property “AS IS.” The Licensee acknowledges that neither the City, nor any employee, agent or representative of the City, has made representations or warranties concerning the condition of the Property. All persons entering the Property under this Agreement do so at their own risk.

8. Liability for Damage. With respect to Licensee’s rights under this Agreement, the Licensee shall be responsible for any damage done to any person, or to the Property or any other property, caused by the Licensee or its officers, directors, employees, agents, independent contractors, insurers, lenders, representatives, successors or permitted assigns of the Licensee, or other users.

9. Insurance. Each Licensee shall maintain in effect during the entire term of this Agreement each of the following:

9.1. Insurance Coverage.

9.1.1. Comprehensive General Liability. Comprehensive General Liability Insurance which affords coverage including completed operations and contractual liability, with limits of liability of not less than $1,000,000 per occurrence and $2,000,000 annual aggregate for liability arising out of Licensee performance of this Agreement. The limits shall be provided by either a single primary policy or combination of policies. If limits are provided with excess and/or umbrella coverage the limits combined with the primary will equal the minimum limits set forth above. If written with an aggregate, the aggregate shall be double the each occurrence limit. Such insurance shall be endorsed to:

9.1.1.1.Name the City of San Clemente and its employees, representatives, officers and agents (collectively hereinafter “City and City Personnel”) as additional insured for claims arising out of Licensee’s performance of this Agreement.
6 55452.01400\31323399.1 5
4889-5985-2898 v4

9.1.1.2.Provide that the insurance is primary and non-contributing with any other valid and collectible insurance or self-insurance available to City.

9.1.2. Automobile Liability Insurance. Automobile Liability Insurance with a limit of liability of not less than $1,000,000 each occurrence and $2,000,000 annual aggregate. The limits shall be provided by either a single primary policy or combination of policies. If limits are provided with excess and/or umbrella coverage the limits combined with the primary will equal the minimum limits set above. Such insurance shall include coverage for all “owned,” “hired” and “non-owned” vehicles, or coverage for “any auto.” Such insurance shall be endorsed to:

9.1.2.1.Name the City and City Personnel as additional insured for claims arising out of Licensee performance of this Agreement.

9.1.2.2.Provide that the insurance is primary and non-contributing with any other valid and collectible insurance or self-insurance available to City.

9.1.3. Workers’ Compensation Insurance. Workers’ Compensation Insurance in accordance with the Labor Code of California and covering all employees of the Licensee providing any service in the performance of this agreement.

Such insurance shall be endorsed to: Waive the insurer’s right of Subrogation against the City and City Personnel.

9.2. Evidence of Insurance. The Licensee shall provide to City a Certificate(s) of Insurance evidencing such coverage together with copies of the required policy endorsements at least fifteen (15) business days prior to the expiration of any policy. Coverage shall not be suspended, voided, cancelled, reduced in coverage or in limits, non-renewed, or materially changed for any reason, without thirty (30) days prior written notice thereof given by the insurer to City by U.S. mail, or by personal delivery, except for nonpayment of premiums, in which case ten (10) days prior notice shall be provided.

9.3. Endorsements.

9.3.1. Valid Endorsements. A statement on an insurance certificate will not be accepted in lieu of the actual endorsement. Insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for approval.

9.3.2. Additional Insured Endorsements Additional Insured Endorsements shall not:

9.3.2.1.Be limited to “Ongoing Operations.”

9.3.2.2.Exclude “Contractual Liability.”
7 55452.01400\31323399.1 6
4889-5985-2898 v4

9.3.2.3.Restrict coverage to the “Sole” liability of Licensee.

9.3.2.4.Contain any other exclusion contrary to the Agreement.

9.4. Acceptability of Insurers. Each policy shall be from a company with current A.M. Best’s rating of A VII or higher and authorized to do business in the State of California or approved in writing by the City.

10. Liens.

10.1. No Liens Due to Licensee’s Activities. Licensee shall not permit to be placed against the Property, or any part thereof, any design professionals’, mechanics’, materialmen’s, contractors’ or subcontractors’ liens due to Licensee’s construction activities thereon or use thereof. Licensee shall indemnify, defend (with counsel acceptable to City) and hold the City harmless from all liability for any and all liens, claims and demands, together with the costs of defense and reasonable attorneys’ fees, related to same.

10.2. Failure to Defend. In addition to, and not in limitation of, the City’s other rights and remedies under this Agreement, should Licensee fail either to discharge any lien or claim related to Licensee’ construction activities on or use of the Property or to bond for any lien or claim to the reasonable satisfaction of the City, or to indemnify, hold harmless and defend the City from and against any loss, damage, injury, liability or claim arising out of Licensee use of the Property, then the City, at its option, may elect to pay any lien, claim, loss, demand, injury, liability or damages, or settle or discharge any action or satisfy any judgment and all costs, expenses and attorneys’ fees incurred in doing so shall be paid to the City by Licensee upon written demand within ten (10) days, together with interest thereon at the rate of ten percent (10%) per annum from the date incurred or paid through and including the date of payment by Licensee.

11. Termination, Default, and Restoration.

11.1. Termination Without Cause. This Agreement may be terminated by either Party without cause by giving sixty (60) days’ written notice to the other Party.

11.2. Termination for Cause. In addition to the rights described in Section 11.1 (Termination Without Cause), the City shall have the right to terminate this Agreement immediately upon the Licensee’ Default.

11.2.1. Default. “Default” means the failure of the Licensee to perform or violation of any term, condition, covenant or agreement of this Agreement, and the continuation of such failure or violation for a period of ten (10) days after the City shall have given the Licensee written notice specifying the same, or in the case of a situation in which the default cannot reasonably be cured within ten (10) days, if the Licensee shall not promptly, within ten (10) days 8 55452.01400\31323399.1 7
4889-5985-2898 v4
after receipt of such notice, commence to remedy the situation by a means that can reasonably be expected to remedy the situation within a reasonable period of time, not to exceed thirty (30) days from the notice of Default, and diligently pursue the same to completion.

11.2.2. Termination and Removal of Licensee’s Property. In the event of any Default by Licensee, including expiration of any applicable cure period, the City may terminate the Agreement and remove Licensee and their property from the Property by any lawful means available in law or equity.

11.3. Restoration of Land to Original Condition. Upon termination of the Agreement, the Licensee shall be responsible for removing all improvements the Licensee placed upon the land, unless the City elects in writing to accept some or all of said improvements. Any improvements accepted by the City will be at no cost to the City. The Licensee shall promptly initiate and exercise due diligence in removing said improvements until all improvements have been removed and restore the Licensed Property to its original condition or better to the City’s satisfaction, which shall be completed within not more than thirty (30) days following termination of this Agreement.

11.4. Effect of Termination. Termination of this Agreement shall in no way prejudice any of the rights and remedies available to the City at law or in equity, and the Licensee acknowledge and agree that all of the obligations and responsibilities of Licensee under this Agreement shall continue and survive such termination.

12. Miscellaneous.

12.1. Indemnification.

12.1.1. Indemnification of the City by the Licensee. The Licensee shall defend (with counsel acceptable to City), indemnify and hold the City, its officials, officers, employees, and agents (the “Indemnified Parties”) free and harmless from any and all liability from any and all claims, causes of action, proceedings, losses, damages, costs (including attorney fees), expenses, taxes, fines, liens and injuries to property or persons, including wrongful death, in any manner arising out of, related to or incident to this Agreement or the acts, omissions, and/or operations by the Licensee, its officials, officers, personnel, employees, contractors, employees and/or subcontractors as well as its contractors’ and/or subcontractors’ officials, officers, employees, agents and/or volunteers. Further, the Licensee shall defend at its own expense, including attorneys’ fees, the Indemnified Parties in any legal action based upon such acts, omissions and/or operations.

12.1.2. The Licensee’s Obligations. The Licensee’s obligations under this Section

12.1 (Indemnification) shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, regardless of whether or not the City has prepared, supplied, or approved any plans or for the uses 9 55452.01400\31323399.1 8
4889-5985-2898 v4
allowed by this Agreement, and regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages.

12.1.3. The City’s Rights. The City does not and shall not waive any rights against the Licensee that the City may have under the indemnification provision in this Section 12.1 (Indemnification) because of the City’s acceptance of any security deposits or insurance policies.

12.1.4. Survival. The indemnification provision in this Section 12.1 (Indemnification) shall survive the termination or expiration of this Agreement.

12.2. Possessory Interest Taxes. Licensee recognizes and understands that this Agreement may create a possessory interest subject to property taxation and that the Licensee may be subject to the payment of property taxes levied on such interest. Licensee agrees to promptly pay any such taxes.

12.3. Governing Law and Venue. This Agreement shall be governed by the laws of the State of California. Venue shall be in Orange County.

Licensee waives any rights that it may have under Code of Civil Procedure §394.

12.4. Waiver. The City’s failure to insist upon strict compliance with any provision of this Agreement or to exercise any right or privilege provided herein, or the City’s waiver of any breach hereunder, shall not relieve the Licensee of any of its obligations hereunder, whether of the same or similar type. The foregoing shall be true whether the City’s actions are intentional or unintentional. Further, the Licensee agrees to waive as a defense, counterclaim, or setoff any and all defects, irregularities, or deficiencies in the authorization, execution, or performance of this Agreement as well as any laws, rules, regulations, ordinances, or resolutions of the City with regard to this Agreement.

12.5. Supplement, Modification, and Amendment. No supplement, modification, and/or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

12.6. Assignment or Transfer.

12.6.1. No Assignment without the City’s Consent. The Licensee shall not assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without prior written consent of the City.

Any attempt to do so shall be null and void, and any assignee, hypothecate, or transferee shall acquire no right or interest by reason of such attempted assignment, hypothecation, or transfer. Unless specifically stated to the contrary in the City’s written consent, any assignment, hypothecation, or transfer shall not release or discharge the Licensee from any duty or responsibility under this Agreement.
10 55452.01400\31323399.1 9
4889-5985-2898 v4

12.6.2. Merger. The transfer of a majority of the ownership interests in the Licensee, however accomplished, and whether in a single transaction or in a series of related or unrelated transactions, or the merger of the Licensee into any other entity in which the Licensee is not the surviving entity, or the sale of all or substantially all of the Licensee’s assets, shall be deemed an assignment of the Licensee’s rights hereunder subject to the requirements of Section 12.6.1 (No Assignment without the City’s Consent).

12.7. Construction, References, and Captions.

12.7.1. Simple Construction. It being agreed the Parties or their agents have participated in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party.

12.7.2. Section Headings. Section headings contained in this Agreement are for convenience only and shall not have an effect in the construction or interpretation of any provision.

12.7.3. Calendar Days. Any term referencing time, days, or period for performance shall be deemed calendar days and not work days.

12.7.4. References to the City. All references to the City shall include, but shall not be limited to, City Council, City Manager, City Attorney, City Engineer, or any of their authorized representatives. The City shall have the sole and absolute discretion to determine which public body, public official or public employee may act on behalf of the City for any particular purpose.

12.7.5. References to the Licensee. All references to the Licensee shall include all officials, officers, personnel, employees, agents, contractors, volunteers and subcontractors of Licensee, except as otherwise specified in this Agreement.

12.8. Notices. All notices to be given hereunder shall be in writing and may be made either by personal delivery or by registered or certified mail, postage prepaid, return receipt requested. Mailed notices shall be addressed to the parties at the addresses listed below. Notices delivered personally will be deemed communicated as of actual receipt; mailed notices will be deemed communicated as of two (2) days after mailing.

To City: To Licensee:

City of San Clemente
910 Calle Negocio
San Clemente, CA 92672
Attn: Kiel Koger
Abound Food Care
200 N. Tustin Suite 110
Santa Ana, CA 92705
Attn: Mike Learakos,
CEO

12.9. Entire Agreement and Severability.
11 55452.01400\31323399.1 10
4889-5985-2898 v4

12.9.1. Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements, either written or oral, express or implied.

12.9.2. Severability. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

12.10. Binding Effect.

12.10.1. The Parties. Each and all of the terms and conditions of this Agreement shall be binding on and shall inure to the benefit of the Parties, and their successors, heirs, personal representatives, or assigns.

12.10.2. Successors and Assigns. This Agreement shall be binding on the successors and assigns of the Parties.

12.10.3. Counterparts and Electronic Signatures. This Agreement may be executed electronically by DocuSign® and in any number of counterparts, each of which shall be enforceable against the parties actually executing such counterparts, and all of which together shall constitute one instrument. True facsimile, electronic or photocopies shall be binding to the same extent as an original signature page.

12.10.4. Authority. Each of the signatories below represents and warrants that he/she has the authority to enter into this Agreement and bind the Party such person is signing as the representative of and that no further actions or authorizations are required to enter into this Agreement.

Signatures on next page.
12 55452.01400\31323399.1 11
4889-5985-2898 v4

SIGNATURE PAGE TO LICENSE AGREEMENT

BY AND BETWEEN THE CITY OF SAN CLEMENTE,
OWNER OF THE PROPERTY AT 380 AVENIDA PICO,

AND ABOUND FOOD CARE (LICENSEE)
In witness thereof, the Parties here to have executed this Agreement:

City of San Clemente Licensee: Abound Food Care
By:
_________________________________
By: _________________________________

ANDY HALL,

CITY MANAGER

MIKE LEARAKOS
CEO
ATTEST:

By:
_________________________________

LAURA CAMPAGNOLO,

CITY CLERK
APPROVED AS TO FORM:

By:
_________________________________

ELIZABETH MITCHELL,

CITY ATTORNEY
13 55452.01400\31323399.1 A-1
4889-5985-2898 v4
Areas A and B together shall constitute the Licensed Property under the Agreement for the Permitted Activities.
14 EXIHIB.IT A

LICENSED PROPERTY

LOCATION OF STORAGE CONTAIINER AND ACCESS AT CITY OF

SAN CLEMENTE
I
I

CONTAINER TO BE

LOCATED IN TH IS AREA A
\ ...___ PATH OF

INGRESS/EGRESS TO BE

LOCATED IN THIS AREA B
Meeting Date: 11/1/2022

AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
Department: Community Development
Prepared By: Adam Atamian, Deputy Community Development Director Subject:
910 Calle Negocio
2nd Floor
San Clemente. Cal1forn1a
www.san-clemente.org
Agenda Item: 4F
RECOMMENDATION OF THE PUBLIC SAFETY COMMITTEE TO CONSIDER SITE AT 380

AVENIDA PICO (THE CITY'S WATER RECLAMATION PLANT PROPERTY) AS A POTENTIAL

LOCATION FOR AN EMERGENCY FOOD STORAGE UNIT
Fiscal Impact:

None.

Summary:

On June 28, 2022, the Public Safety Committee (PSC) approved forwarding a recommendation to the City Council to consider providing space at the City's Water Reclamation Plant located at 380 Avenida Pico for a food storage unit.

Background:

This item was presented at the City Council meeting of September 6, 2022. At that meeting, the Council directed staff to bring this item back for Council consideration after Councilmembers, either individually or in pairs, had an opportunity to meet with representatives of Abound Food Care (AFC).

Council members who were interested met recently with AFC to learn more about the operations of their organization and the food storage-unit program. As result, this item is being brought back for the Council's consideration.

As part of the PSC's 2021-2022 Annual Work Plan, the PSC received a special presentation by AFC related to disaster preparedness and planning, specifically methods to make food available for distribution during an emergency. The food-storage units are typically manufactured from shipping containers, measuring 20 ft. by 8 ft. by 8.5 ft.

Discussion:

AFC has worked with other local government agencies and organizations in Orange County to place emergency, food-storage units around the County. The meals inside would be available for distribution to the community in case of a natural disaster or other serious emergency. If no emergency occurs, the meals are distributed to local nonprofits at regular intervals, then new meals are prepared for storage in the unit.

AFC staff indicated to the PSC that they are looking for a location in San Clemente for placement of a food-storage unit. Attachment 1 provides a location map of the proposed area. AFC has grant funding to cover expenses related to the preparation of the food and provision of the food-storage unit, no costs of this program are required to be paid by the City. This consideration relates only to the approval of a location on City property for the potential placement of a food-storage unit at a date CITY OF SAN CLEMENTE Page 1 of 3 Printed on 10/27/2022
1 ATTACHMENT 2
15 16
Meeting Date: 11/1/2022 Agenda Item: 4F
in the future which is currently unknown.

Should Council accept the PSC's recommendation to allow the use of the City's Water Reclamation Plant property for the purpose of an emergency, food-storage unit, future applicants, such as AFC, would be required to submit a request to the City for the use of said property. This request may require a lease agreement with the City to ensure the long-term maintenance of the unit and the City's property. In addition, due to its location in the Coastal Zone, prior to the placement of a foodstorage unit within the proposed area, applicants would be required to apply for, and receive, approval of the project from the California Coastal Commission.

Plan and Policy Consistency:

The Centennial General Plan's Safety Element includes the Goal to, "[continue] to be a safe, disaster -resilient community that is prepared through effective community outreach, proactive monitoring, and efficient emergency services, response, recovery and mitigation." This goal is achieved through implementation of Policy S-7.04, Interdepartmental and lnteragency Collaboration, which states, "We collaborate among City departments and with organizations outside of the City for a comprehensive approach to emergency services and disaster preparedness, response and recovery, including continuity of operations (e.g. information technology and financial services)." Environmental Review (CEQA):

The Community Development Department completed an environmental assessment for the proposed project in accordance with the California Environmental Quality Act (CEQA). Staff recommends the City Council hereby finds and determines that the proposed project is categorically exempt from CEQA pursuant to State CEQA Guidelines Section 15303 (Class 3: New Construction or Conversion of Small Structures), 15304 (Class 4: Minor Alterations to Land), and Section 15311 (Class 11:

Accessory Structures).

The Class 3 exemption specifically exempts from further CEQA review, the construction and location of limited numbers. of new, small facilities or structures, such as accessory and appurtenant structures. The Class 4 exemption specifically exempts minor alterations in the condition of land, water, and/or vegetation that do not involve the removal of healthy, mature, scenic trees. The Class 11 exemption specifically exempts the construction or replacement of minor structures accessory or appurtenant to existing commercial, industrial, or institutional facilities, such as mobile food units.

Here, the project involves the placement of a non-permanent, food-storage unit, potentially involving minimal grading to create a level pad, accessory to the existing use of the proposed property location.

Furthermore, none of the exceptions to the use of the Class 3, 4 and 11 categorical exemptions identified in State CEQA Guidelines section 15300.2 apply. The project will not result in a cumulative impact from successive projects of the same type in the same place, over time. There are no unusual circumstances surrounding the project that result in a reasonable possibility of a significant effect on the environment. There are no sensitive resources, such as endangered species, on the project site or in the vicinity. The project will not damage scenic resources, including trees, historic buildings, rock outcroppings, or similar resources.

Recommended Actions:

Staff Recommendation
CITY OF SAN CLEMENTE Page 2 of 3 Printed on 10/27/2022
17 Meeting Date: 11/1/2022 Agenda Item: 4F
Staff recommends that the City Council approve the Public Safety Committee's recommendation to allow a portion of the City's Water Reclamation Plant property to be used for the placement of an emergency food-storage unit.

Attachment:

Location Map.

CITY OF SAN CLEMENTE Page 3 of 3 Printed on 10/27/2022
18 Location Map ATTACHMENT 1
ATTACHMENT 3
RESOLUTION NO. 23-30

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SAN CLEMENTE, CALIFORNIA, APPROVING A

LICENSE AGREEMENT WITH ABOUND FOOD CARE
WHEREAS, the City wishes to have a storage facility within the City limits for emergency food in the time of a disaster or emergency; and WHEREAS, Abound Food Care’s mission is to provide solutions and facilitate collaboration with public, private, and non-profit sectors to guide and support the implementation of regional food care programs that optimize the supply chain to end hunger and food waste; and
WHEREAS, Abound Food Care’s Emergency Food Management Program enables local jurisdictions, state and federal agencies, emergency services, and community organizations to provide ready-to-eat, nutritious meals following an emergency and ensuring that citizens have access to food; and
WHEREAS, Abound Food Care’s first priority will be to work with San Clemente non-profits, but will also work with surrounding city agencies for distribution to residents in need; and
WHEREAS, the location of this emergency food storage unit was previously approved by the City Council at the November 1, 2022 Council meeting; and WHEREAS, the project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures, 14 CCR Section 15303) under the State CEQA Guidelines; and
WHEREAS, a five-year license agreement with Abound Food Care to install, maintain and operate one solar powered cold storage unit with solar panels in a material storage yard at the City’s Water Reclamation Plant at 380 Avenida Pico is in the best interests of the citizens of San Clemente.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:

SECTION 1. That the above recitations are true and correct.

SECTION 2. That the City Manager is authorized to execute a License Agreement with Abound Food Care to install, maintain and operate one solar powered cold storage unit with solar panels in a material storage yard at the City’s Water Reclamation 19 Resolution No. 23-30 Page 2
Plant at 380 Avenida Pico for a five-year term in a form substantially similar to the agreement attached to this resolution as Exhibit A and incorporated fully herein by this reference.

SECTION 3. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of June, 2023.
_______________________
Mayor of the City of
San Clemente, California
ATTEST:
__________________________
CITY CLERK of the City of
San Clemente, California
20 Resolution No. 23-30 Page 3

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. _23-30 was adopted at a regular meeting of the City Council of the City of San Clemente held on _______ day of June, 2023, by the following vote:

AYES:

NOES:

ABSENT:
_______________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
21 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 8A
Department: Finance and Administrative Services
Prepared By Jacob Rahn, Financial Services Officer
Subject:

ADOPTION OF THE FISCAL YEAR 2023-24 BUDGET
Summary:

The City of San Clemente operates financially on a fiscal year budget. The budget takes effect on July 1 of each year and provides financial allocations through June 30 of the following year. The municipal budget includes several funds, or sections, with the primary operating budget being the City’s General Fund. The budget is prepared with input from residents, elected officials, and staff. The City Council approves the budget, and any amendment to the budget, by a majority vote.

Background:

On May 23, 2023, the City held a budget workshop for the proposed FY 2023-24 operating and capital improvement budgets. At the public budget workshop, staff presented the summarized budget and covered decision packages included in the budget. Staff identified the Strategic Priorities, and presented a financial overview related to the budget identifying Department Highlights, CIP Program and Decision Packages. Various public input was received in conjunction with the presentation.

At the conclusion of the Budget presentation which covered all City funds including the department activities and budgets, the City Council was able to provide input and receive public comments. The City Council discussions focused on a variety of topics and at the conclusion of the deliberations the City Council approved all budgeted Decision Packages. These included items such as the new Coastal Administrator position, UAL Pension funding payment, and various other packages in the General Fund. In the other, or non-General Fund budgets, the decision packages included pay station replacement, data storage upgrades and other one-time costs.

Additionally, the City Council incorporated the action taken on May 16, 2023 into the budget authorizing the use of unassigned Fund Balance to fund the one-time cost for 4 additional OCSD deputies under the police contract, to improve public safety and address enforcement in geographic areas. The total deputy cost of $1.4 million is included in the budget, with the net cost of $1.2 million included in the General Fund. These one-time amounts are included in the budget with the OCSD contract and will be agendized for the June 20, 2023 meeting.

The FY 2023-24 budget is summarized as follows:

All Funds Budget:

For FY 2023-24 resources for all funds, including fund balances, total $282.7 million. Excluding fund balances, revenues for all funds total $173,188,830 and expenditures total $190,654,030. The City has a positive operating position once one-time activity and capital costs are removed from the totals.

CITY OF SAN CLEMENTE Page 1 of 3 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 8A
has a positive operating position once one-time activity and capital costs are removed from the totals.

A Resolution (Attachment 1) has been prepared to adopt and approve the FY 2023-24 budget for the General Fund, Special Revenue Funds, Capital Project Funds, Enterprise Funds, and Internal Services Funds. The All Funds Budget Summary (Exhibit I) presents the total budget for FY 2023-24.

General Fund:

The FY 2023-24 General Fund budget reflects total revenues of $79,641,760 and total expenditures of $85,106,290, including one-time amounts. This amount was revised to fund the one-time addition of the 4 deputies based on the Council action approved at the May 16, 2023 meeting and subsequently funded by fund balance in the FY 2023-24 Budget at the public budget workshop. The revised General Fund’s FY 2023-24 budgeted ending fund balance is anticipated to be $16.8 million on a total General Fund budget of $85.1 million.

The General Fund operating position will be lean with a small positive operating position. Based on existing fiscal policy and GASB 54, the City Council is committing a portion of the General Fund’s fund balance for an Emergency Reserve (18% of operating costs or $14.3 million), these funds are included as part of a resolution and can be used only through City Council action.

The San Clemente budget, if adopted, is subject to change by the Council action during the budget year to address items that arise during the year and to address revenue and cost adjustments. Staff reports updates to the City Council as the fiscal year progresses. Actions can be recommended and approved by Council to change the budget at any future City Council meeting.

Council Options:
· Approve the Resolution and adopt the revised FY 2023-24 Budget. · Continue the item and direct staff to make additional revisions to the FY 2023-24 Budget prior to adoption.
· Deny the Resolution and the FY 2023-24 Budget.

Fiscal Impact:

The adoption of the FY 2023-24 budget will establish funding levels for all City funds for the period July 1, 2023 through June 30, 2024. For all funds for FY 2023-24, total revenues equal $173,188,830 and total expenditures are $190,654,030 utilizing fund balance for one-time costs.

Environmental Review/Analysis:

Not applicable.

Recommended Actions:

Staff Recommendation
Adopt Resolution No. 23-44 entitled: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, ADOPTING AND APPROVING THE BUDGET AT THE FUND LEVEL FOR THE CITY OF SAN CLEMENTE FOR THE 2023-24 FISCAL YEAR AND THE COMMITMENT OF FUND BALANCE;
CITY OF SAN CLEMENTE Page 2 of 3 Printed on 6/1/2023
powered by Legistar™ 2
Meeting Date: 6/6/2023 Agenda Item: 8A
Attachments:

1. Resolution No. 23-44

2. Exhibit I - All Funds Budget Summary
Notification:

None.

CITY OF SAN CLEMENTE Page 3 of 3 Printed on 6/1/2023
powered by Legistar™ 3
ATTACHMENT 1
4878-4403-6455 v1
RESOLUTION NO. 23-44

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, ADOPTING AND

APPROVING THE BUDGET AT THE FUND LEVEL FOR THE
CITY OF SAN CLEMENTE FOR THE 2023-24 FISCAL YEAR

AND THE COMMITMENT OF FUND BALANCE
WHEREAS, the City Manager has prepared the City of San Clemente’s budget for the Fiscal Year (FY) ending June 30, 2024; and
WHEREAS, the City Council held a public budget workshop and on the proposed 2023-24 Fiscal Year budget on May 23, 2023; and
WHEREAS, the City Council held a public hearing on the proposed 2023-24 Fiscal Year budget on June 6, 2023; and
WHEREAS, pursuant to Governmental Accounting Standards Board Statement No. 54, an action of the City Council is necessary to commit budget amounts in various funds for the specific purposes they intend.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:

Section 1. That the above recitals and true and correct and incorporated herein.

Section 2. That the City Council does hereby approve and adopt the Budget for the City of San Clemente for the Fiscal Year 2023-24 at the fund level for all funds as shown on see Exhibit I hereto which is incorporated fully by this reference.

Section 3 General Fund Reserves are established and maintained based on the following levels within the General Fund. The City Council is authorized to expend the reserved funds by approving a formal resolution. The Emergency Reserve for FY 2023-24 is 18% of budgeted operating expenditures.

Section 4. Copies of the FY 2023-24 budget document are on file in the Office of the City Clerk.

Section 5. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of June, 2023.
4 Resolution No. 23-44 Page 2
4878-4403-6455 v1
ATTEST:
___________________________ __________________________
City Clerk of the City of Mayor of the City of San
San Clemente, California Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-44 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of June 2023, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
5 Exhibit I -
Beginning FY 2023-24 FY 2023-24 Ending Changes in %
Balance Revenues Expenditures Balance Balances Change
General Fund 22,259,217 79,641,760 85,106,290 16,794,687 (5,464,530) -25% Special Revenue Funds
Street Improvement 645,030 2,052,000 2,628,050 68,980 (576,050) -89% Gas Tax 1,395,280 3,627,290 2,862,310 2,160,260 764,980 55% Miscellaneous Grants 275,650 405,940 395,940 285,650 10,000 4% Disaster Relief 0 0 0 0 0 0%
Air Quality Improvement 298,910 85,100 80,000 304,010 5,100 2% Local Cable Infrastructure 910,230 202,000 10,360 1,101,870 191,640 21% Police Grants 254,450 167,480 226,940 194,990 (59,460) -23% Local Transit Program Grants 195,090 857,850 999,000 53,940 (141,150) 0% Building Homes & Jobs Act (SB2) Fund 29,890 295,830 253,460 72,260 42,370 0% Capital Project Funds
Parks Acquisition & Dev. 2,394,660 50,000 2,087,140 357,520 (2,037,140) -85% Local Drainage Facilities 972,510 545,700 1,325,590 192,620 (779,890) -80% RCFPP 839,020 14,000 9,930 843,090 4,070 0%
Public Facilities Construction Fee 1,044,350 52,500 768,380 328,470 (715,880) -69% Developers Improvement 4,811,270 199,400 12,160 4,998,510 187,240 4% In-Lieu Housing 10,747,680 3,000 0 10,750,680 3,000 100% Low/ Moderate Income Housing 2,827,120 10,540 41,930 2,795,730 (31,390) -1% Reserve 9,795,870 2,087,240 4,810,000 7,073,110 (2,722,760) -28% Enterprise Funds
Water - Operating 8,485,772 25,819,614 27,363,730 6,941,656 (1,544,116) -18% - Depreciation Reserve 9,459,164 5,842,984 7,153,030 8,149,118 (1,310,046) -14% - Acreage Fee 296,302 2,734,228 3,007,890 22,640 (273,662) -92% - Other Agency 4,533,632 760,694 1,008,180 4,286,146 (247,486) -5% Sewer - Operating 1,034,338 10,888,321 11,736,130 186,529 (847,809) -82% - Depreciation Reserve 2,274,287 3,273,684 4,182,130 1,365,841 (908,446) -40% - Connection Fee 14,651 12,001,519 12,016,170 0 (14,651) -100% - Other Agency 905,404 217,246 264,560 858,090 (47,314) -5% Storm Drain - Operating 129,098 1,927,151 1,652,300 403,949 274,851 213% - Depreciation Reserve 1,560,452 915,399 1,632,910 842,941 (717,511) -46% Solid Waste Management 521,630 222,850 227,270 517,210 (4,420) -1% Golf - Operating 1,171,186 3,233,863 3,013,060 1,391,989 220,803 19% - Depreciation Reserve 3,441,042 278,430 104,750 3,614,722 173,680 5% - Capital Improvement 1,467,262 147,367 417,380 1,197,249 (270,013) -18% Clean Ocean 144,020 2,744,070 2,391,910 496,180 352,160 245% Internal Service Funds
Central Services 283,440 435,550 510,060 208,930 (74,510) -26% Information Technology 1,092,560 2,219,030 2,666,330 645,260 (447,300) -41% Contract Fleet Services 46,665 1,319,848 1,366,470 43 (46,622) -100% Fleet Replacement Reserve 5,270,885 636,012 591,580 5,315,317 44,432 1% Medical Insurance 86,190 4,003,340 3,917,840 171,690 85,500 99% Workers' Compensation 1,862,530 510,000 617,110 1,755,420 (107,110) -6% General Liability Self Insurance 5,765,570 2,760,000 3,195,760 5,329,810 (435,760) -8% Total All Funds 109,542,307 173,188,830 190,654,030 92,077,107 (17,465,200) -16% All Funds Budget Summary
ATTACHMENT 2
6 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 9A
Department: Public Works
Prepared By Samantha Wylie, Beaches, Parks & Recreation Director Kiel Koger, Public Works Director/City Engineer
Subject:

UPDATE ON THE PLAN TO MOVE TEMPORARY PICKLEBALL COURTS FROM SAN GORGONIO PARK TO RICHARD T. STEED MEMORIAL PARK AND APPROVAL OF A

CONSTRUCTION CONTRACT WITH KOMPAN, INC
Summary:

Pursuant to Council direction, staff is providing an update on moving the temporary pickleball court facility at San Gorgonio Park as quickly as possible to Richard T. Steed Memorial Park. Staff has secured a vendor, Kompan, Inc., to build the temporary facility with eight courts. The estimated cost is $1,215,817.04, which is within the $3 million budget for the project authorized by Council, and includes the concrete surfacing, court lines, fencing, nets/posts, and benches. Staff anticipates that most of this project can be reused/relocated when the permanent facility is built.

Background:

At its May 16, 2023 meeting, the City Council approved the installation of eight temporary courts at Richards T. Steed Memorial Park as soon as possible on the undeveloped lot adjacent to the skate court facility. At that meeting, staff committed to bringing back an update on securing the contract to build the temporary courts at its next regular meeting.

Staff utilized the State contract system to procure a vendor to supply the materials and perform the construction of the temporary court project. This methodology expedites the construction timeline by eliminating the requirement to go through a City-led formal bidding process. As a check, staff solicited informal bids from other vendors to ensure that the pricing was still competitive. The vendor estimates that, upon approval, the project should be completed within five months. As soon as these courts are completed, the ones at San Gorgonio Park will be closed. This is the fastest timeline that staff could obtain.

Council Options:

1. Adopt Resolution No. 23-47, awarding a construction contract to build eight temporary pickleball courts at Steed Park to Kompan, Inc., for an amount not to exceed $1,215,817.04, plus a 10% contingency; authorizing the City Manager to execute such a contract in a form approved by the City Attorney; and authorizing and directing staff to close the pickleball courts at San Gorgonio Park as soon as construction of the temporary facility at Steed Park is completed.

2. Adopt Resolution No. 23-47 with modifications.

3. Continue the item and provide staff with alternate direction on the temporary courts, including CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/2/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 9A

3. Continue the item and provide staff with alternate direction on the temporary courts, including location and/or procurement process.

4. Do no adopt Resolution No. 23-47.

Fiscal Impact:

Funding for this project is incorporated into the capital improvement project program for FY 2022-23 and additional funds included in FY 2023-24.

Environmental Review/Analysis:

The temporary courts comply with the requirements outlined in the Mitigated Negative Declaration (MND) issued under the California Environmental Quality Act (CEQA) for the project. The City Council adopted the Initial Study and subsequent MND on May 2, 2023.

Recommended Actions:

Staff Recommendation
STAFF RECOMMENDS THAT the City Council adopt Resolution No. 23-47, which would:

1. Affirm City Council’s intention to move the temporary pickleball court facility at San Gorgonio Park as quickly as possible to Richard T. Steed Memorial Park;

2. Award a construction contract to build eight temporary pickleball courts at Steed Park to Kompan, Inc., for an amount not to exceed $1,215,817.04, plus a 10% contingency;

3. Authorize and direct the City Manager to execute such a contract in a form approved by the City Attorney; and

4. Authorize and direct staff to close the pickleball courts at San Gorgonio Park as soon as construction of the temporary facility at Steed Park is completed.

Attachment:

1. Resolution No. 23-47

2. Site Plan

3. Sales Proposal
Notification:

None
CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/2/2023
powered by Legistar™ 2
Attachment 1
RESOLUTION NO. 23-47

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, AWARDING A CONTRACT
TO KOMPAN, INC. FOR THE CONSTRUCTION OF EIGHT
TEMPORARY PICKLEBALL COURTS AT RICHARD T.

STEED MEMORIAL PARK AND AUTHORIZING THE CITY

MANAGER TO EXECUTE A CONSTRUCTION CONTRACT
IN AN AMOUNT NOT TO EXCEED $1,215,817.04 AND TAKE

RELATED ACTIONS
WHEREAS, on May 2, 2023, the City Council adopted an update to park master plan of Richard T. Steed Memorial Sports Park (“Steed Park”) and approved the Initial Study and Mitigated Negative Declaration, which included the development of a 16 court pickleball facility; and
WHEREAS, on May 16, 2023, the City Council approved the design of an additional eight pickleball courts at the Richard T. Steed Memorial Sports Park (“Steed Park”) proposed pickleball facility; and
WHEREAS, at its meeting, the Council further considered a temporary location for eight pickleball courts at Steed Park and approved (4-0) to place temporary courts at the undeveloped lot adjacent to the skateboard court facility, directing staff to expedite the construction process; and
WHEREAS, City Council’s intention is to move the temporary pickleball court facility at San Gorgonio Park as quickly as possible to Steed Park; and WHEREAS, staff utilized the State contract system to procure a vendor to supply the materials and perform the construction of the temporary court project; and WHEREAS, Kompan, Inc. has submitted a proposal to construct the temporary court project for $1,215,817.04.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve, find and determine as follows:

Section 1. That the foregoing recitals and true and correct and are incorporated herein.

Section 2. That the project complies with the requirements outlined in the Mitigated Negative Declaration (MND) issued under the California Environmental Quality Act (CEQA) for the master plan of Richard T. Steed Memorial Sports Park.

Section 3. That a contract to construct eight temporary pickleball courts at Steed Park is hereby awarded to Kompan, Inc. in an amount not to exceed $1,215,817.04, plus a 10% contingency,
3 Resolution No. 23-47 Page 2
Section 4. That the City Manager is authorized and directed to execute a contract to construct eight temporary pickleball courts at Steed Park with Kompan, Inc. in a form approved by the City Attorney.

Section 5. That staff is authorized and directed to close the pickleball courts at San Gorgonio Park as soon as construction of the temporary facility at Steed Park is completed.

Section 6. That staff is authorized and directed to take those actions that are necessary and proper to accomplish the purpose and intent of this resolution in a timely and expeditious fashion.

The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of June , 2023.

ATTEST:
___________________________ __________________________
City Clerk of the City of Mayor of the City of San
San Clemente, California Clemente, California
4 Resolution No. 23-47 Page 3

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-47 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of June, 2023, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
5 139'-9" [4260cm]
138'-3 1/2" [4215cm]
8'-0" [244cm]
20'-0" [610cm]
44'-0" [1341cm]
7'-0" [213cm]
7'-0" [213cm]
15'-0" [457cm]
15'-0" [457cm]
10'-0" [305cm]
10'-0" [305cm]
30'-4 3/4" [927cm]
30'-4 3/4" [927cm]
DATE:DRAWN BY:

REVIEW BY:REPS NAME:

SHEET:

REV. NO. REVISION NOTES: REVISION DATE:

FOR USE BY CONTRACTOR, ENGINEER, OR DESIGN PROFESSIONAL OF RECORD. SEE SIGNED SALES PROPOSAL FOR COMPLETE SCOPE TO BE PROVIDED BY KOMPAN OR REPRESENTING AGENCY. CONFIRM FINAL PLAN AND SCOPE WITH KOMPAN SALES REP OR PROJECT MANAGER PRIOR TO USE FOR REVIEW, PERMITTING, OR CONSTRUCTION.

TO BE READ CONTINGENTLY WITH KOMPAN'S STANDARDS FOR SITE PREPARATION, MATERIALS AND INSTALLATION PROCESSES; PROVIDED AFTER EQUIPMENT PURCHASE. A COMPLIANT PLAYGROUND TO KOMPAN'S STANDARDS MUST SATISFY ALL REQUIREMENTS IN THE CODE OF CONDUCT.SLAB BY OTHERS UNLESS OTHERWISE NOTED. FOR SURFACE MOUNT OPTIONS, THE CONCRETE REQUIREMENTS MAY BE UP TO 5½" OF 3,500 PSI MINIMUM COMPRESSIVE STRENGTH. CONTACT KOMPAN FOR SPECIFIC PRODUCT REQUIREMENTS.

ALL COMPOSITE STRUCTURES SHOWN REQUIRE A SITE GRADE OF 2% MAXIMUM, 1% OPTIMAL. SPECIFICATIONS FOR EACH KOMPAN STRUCTURE MAY BE FOUND AT KOMPAN.COM/KOMPANMASTERDIMENSIONS OF PLAY AREA, SIZE AND ORIENTATION, LOCATIONS OF ALL EXISTING UTILITIES, EQUIPMENT AND SITEFURNISHINGS TO BE FIELD VERIFIED PRIOR TO CONSTRUCTION.PREPARED AND PRINTED IN USA BY KOMPAN © 2023 KOMPAN, INC. AUSTIN, TX. USA 800-426-9788 MANUFACTURER'S SHOP DRAWING:

REV. BY:

LAYOUT IS IN ACCORDANCE WITH ASTM F3101
2 JoaAce Site 05/18/23
DESIGN 04/25/23
Jeff Graef AdaPur
K2.1
6WHHG3LFNOH%DOO
5LFKDUG76WHHG0HPRULDO3DUN
247 Avenida La Pata
San Clemente, CA 92673
Site Plan
032 64
1/32"=1'-0" ON 11" x 17" SHEET
A7
A10
A4
A3
A6
A9
A11
A8
A5
A2
A1
# Product Number Product Name M.F.H. Count
A PAR4054-xx02 Agora Steel Bench with Backrest 0'' 11
B FAS372556 Custom FRE603201 MUGA 0" 2
B1
B2

CONCRETE PATHWAY
AREA: 1294 SQFT
PERIMETER: 340' 4"
$WWDFKPHQW
6 City of San Clemente
910 Calle Negocio
Kiel Koger
San Clemente, CA 92673
E-Mail
Sales Representative
[email protected]
Jeff Graef
Quote No.

Document Date
SP123877-5
05/10/2023
Sales Proposal
Phone No. 330-338-8588 / 800-426-9788
Expiration Date 07/09/2023
Project Name US290776 San Clemente - Pickle Ball - Steed Park Customer No. C124221
No. Description Qty Unit Unit Price Discount % Net Price OMNIA Partners Contract #2017001135
Equipment
FAS-CUSTOM FAS-CUSTOM 4 Court Picklball Courts 2 Pieces 152,380.00 15.00 259,046.00 372556
US-TPP-CUSTOM Round Pickleball Post & Net Package 8 Pieces 723.08 5.00 5,495.41 PK31009
PAR4054-0002 Agora Steel Bench with Backrest - Black 11 Pieces 2,740.00 15.00 25,619.00 Surface (expansion bolts)
INSTALL SPECIAL Installation of Equipment Based on PW 1 Pieces 270,008.34 9.00 245,707.59 FREIGHT Freight 1 Pieces 40,660.04 40,660.04

EXTRA SALES

FREIGHT
Extra freight costs for 3rd party sales 1 Pieces 560.00 560.00 EXTRAS Payment and Performance Bond 1 Pieces 26,128.59 26,128.59 Sitework and Surfacing
USCONCRETEWORKPour 140' x 140' Slab Including 165' x 8' Walkway 19,800 Sq. Feet 23.08 5.00 434,134.80 Concrete Slab with Light Grading/Excavation
US-CUSTOMSURFACINGCustom Sports Surfacing Paint with Striping of 1 Sq. Feet 113,846.16 5.00 108,153.85 8 Pickleball courts
US-TPP-CUSTOM Supply/Install Custom Windscreens 10' x 720 LF 1 Pieces 36,553.85 5.00 34,726.16 KOMPAN, INC. | 605 W Howard Lane Ste 101 | Austin, TX 78753 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)

Page 1 of 3 ends

Attachment 3
7 KOMPAN"f- OMNIA® PARTN E R S
Let's play
City of San Clemente
910 Calle Negocio
Kiel Koger
San Clemente, CA 92673
E-Mail
Sales Representative
[email protected]
Jeff Graef
Quote No.

Document Date
SP123877-5
05/10/2023
Sales Proposal
Phone No. 330-338-8588 / 800-426-9788
Expiration Date 07/09/2023
Project Name US290776 San Clemente - Pickle Ball - Steed Park Customer No. C124221
No. Description Qty Unit Unit Price Discount % Net Price Notes
Please read attached General Assumptions and
Exclusion document for information on
Install/Sitework.

Please allow 15-17 weeks for product delivery upon
order placement
Pricing valid with an approved Kompan Site Plan
Site to be prepped and ready for install with no
more than a 1% total grade
Excludes sitework, products, & services not listed
Description Qty Retail Price Discount Net Price
22 377,238.49 52,351.92 324,886.57
113,846.16 5,692.31 108,153.85
726,992.34 47,149.95 679,842.39
41,220.04 41,220.04
1,180,231.44
35,585.60
No. of Products
Subtotal - Products
Subtotal - Surfacing
Subtotal - Installation
Subtotal - Freight
Subtotal - P&P Bond
Total USD Excl. Tax
Estimated Tax rate
Total USD Incl. Tax
1,215,817.04
KOMPAN, INC. | 605 W Howard Lane Ste 101 | Austin, TX 78753 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)

Page 2 of 3 ends

26,128.59 26,128.59
8 KOMPAN"f- OMNIA® PARTN E R S
Let's play
City of San Clemente
910 Calle Negocio
Kiel Koger
San Clemente, CA 92673
E-Mail
Sales Representative
[email protected]
Jeff Graef
Quote No.

Document Date
SP123877-5
05/10/2023
Sales Proposal
Phone No. 330-338-8588 / 800-426-9788
Expiration Date 07/09/2023
Project Name US290776 San Clemente - Pickle Ball - Steed Park Customer No. C124221
Business Agreement OMNIA Partners Contract
Payment Terms 50% Prepayment , 50% Net 30 days
Installation Site Address
Richard T. Steed Memorial Park
247 Av. La Pata
San Clemente, CA 92673
Note that the color and texture of products and surfacing made with recycled content are subjected by the differences from the used recycled raw materials. Therefore, minor differences in the appearance and texture can occur.

Applicable sales tax will be added unless a valid tax exemption certificate is provided. This amount is only an estimate of your tax liability.

Your acceptance of this proposal constitutes a valid order request and includes acceptance of terms and conditions contained within the Master Agreement, which is hereby acknowledged.

Acceptance of this proposal from KOMPAN is acknowledged by issuance of an order confirmation by an authorized KOMPAN representative.

Prices in this quotation are good until expiration date, shown in the top of this document. After that date, this proposal may be withdrawn.

KOMPAN Products are "Buy American" qualified, and compliant with the Buy American Act of 1933 and the "Buy American" provision of ARRA of 2009.

Prevailing Wage and Payment & Performance Bonds are not included unless stated in body of Sales Proposal. If Payment & Performance Bonds are needed, add 2.2% of the entire sales proposal.

KOMPAN Authorized Signature:

Accepted By (signature): __________________________________________________ Accepted By (please print): _______________________________________________ Date: __________________________________________________ KOMPAN, INC. | 605 W Howard Lane Ste 101 | Austin, TX 78753 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)

Page 3 of 3 ends

9 KOMPAN"f- OMNIA® PARTN E R S
Let's play

AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 10A
Department: Public Works
Prepared By Zak Ponsen, Assistant City Engineer
Ryan Kim, Senior Civil Engineer - Traffic
Subject:

ADOPTION OF RESOLUTION NO. 23-45, APPROVING THE LOCAL ROADWAY SAFETY PLAN (LRSP)
Fiscal Impact:

None at this time.

Summary:

The Planning Commission and staff recommend that City Council approve the Local Roadway Safety Plan (LRSP).

Background:

A Local Roadway Safety Plan (LRSP) provides a framework to identify, analyze, and prioritize roadway safety improvements on local roads. Its content focuses on local issues and needs resulting in a prioritized list of concerns, risks, actions, and improvements to reduce traffic fatalities and serious injuries on local roads.

The City Council authorized staff to submit a grant application to Caltrans for the LRSP development in February 2020. After the City received the grant, the City Council approved the Professional Services Agreement (PSA) with Kimley-Horn and Associates to prepare the LRSP in April 2021.

The LRSP, provided as Attachment 1, presents the Introduction, Vision and Goals, Process, Safety Partners, Existing Efforts, Data Summary, Collision Analysis Results, Emphasis Areas, Opportunities, and Evaluation and Implementation of the plan. The vision is to enhance the transportation network to reduce traffic fatalities and serious injuries. Under this vision, this report provides four (4) goals:

Goal 1: identify areas with a high risk for collision;
Goal 2: illustrate the value of a comprehensive safety program and systemic process; Goal 3: plan future safety improvements; and
Goal 4: define safety projects for future Highway Safety Improvement Program (HSIP) and other program funding considerations.

Discussion:

The LRSP identifies engineering and non-infrastructure safety measures that can be implemented throughout the City’s transportation network. Furthermore, the report identifies areas with a high risk for collisions, illustrates the value of a comprehensive safety program and the systemic process to identify high-risk locations for collisions, prepares future safety improvements for short and long-term implementation, and defines safety projects for HSIP and other program funding considerations.

CITY OF SAN CLEMENTE Page 1 of 3 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 10A
implementation, and defines safety projects for HSIP and other program funding considerations.

Preparing and approving a LRSP would position the City for future HSIP grant eligibility.

The report includes several specific intersections/areas of concern and provides some preliminary recommendations for future projects to consider. It is important to note that by processing and approving the LRSP, the City Council is not approving any specific projects, obligating any future funding, or acknowledging safety issues in any particular street segment. The LRSP as a tool is beneficial in framing future traffic engineering evaluations. The LRSP helps identify high collision areas, assign a systemic process for future improvements for near-, mid-, and long- term, and defines potential projects for future HSIP funding consideration. Future modifications to street areas will be done based on a wide range of factors, additional studies, and engineering analyses.

During the Planning Commission hearing on May 17, 2023, there was discussion regarding the LRSP and the City’s ability to seek additional grants to support future road improvement projects.

Discussion included the City’s need for a strategic investment in grants.

If the City Council supports the LRSP and implementation by the City’s Engineering Division, staff will forward the City Council’s action and the LRSP to Caltrans to complete the grant project.

Council Options:
· Adopt Resolution No. 23-45, approving the Local Roadway Safety Program and adoption as a tool to be used to address local roadway safety issues and needs, and future grant funding opportunities.
· Continue the Item and direct staff to provide additional information. · Deny Resolution No. 23-45 and deny the approval of the Local Roadway Safety Program.

Environmental Review/Analysis:

The Planning Commission and staff recommend that the City Council determine this action to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 6 (Information Collection, 14 CCR section 15306) and Class 1 (Existing Facilities, 14 CCR section 15301.k) of the State CEQA Guidelines.

Recommended Actions:

Planning Commission and Staff recommend that the City Council approve the following actions:

Adopt Resolution No. 23-45, which would:

1. Determine that the project is categorically exempt from the requirements of the CEQA pursuant to CEQA Guidelines Section 15306 (Class 6, Information Collection) and Section 15301 (Class 1, Existing Facilities), of the State CEQA Guidelines.

2. Approve the Local Roadway Safety Plan (LSRP).

3. Approve the LRSP for adoption as a tool to be used to address local roadway safety issues and needs, and future grant funding opportunities.

CITY OF SAN CLEMENTE Page 2 of 3 Printed on 6/1/2023
powered by Legistar™ 2
Meeting Date: 6/6/2023 Agenda Item: 10A
Attachment:

1. LRSP Report from Kimley-Horn and Associates

2. Resolution No. 23-45
Notification:

None.

CITY OF SAN CLEMENTE Page 3 of 3 Printed on 6/1/2023
powered by Legistar™ 3
City of San Clemente
Local Roadway Safety Plan (LRSP)
December 2022
Prepared By:

ATTACHMENT 1
4 .
·. N c·· -_ . .
. . .· . . · .. . : _· . ·,
·-- : . ·.
-. ·. ~ ..
!:: ~ -~ . u CT) I
Kimley>>> Horn
SAN CLEMENTE LRSP 2022
ii
Executive Summary
San Clemente has created this local roadway safety plan (LRSP), which incorporates a framework to identify, analyze, and develop traffic safety enhancements on the City’s roadway network. The LRSP was developed to address local roadway safety issues and needs. Through the analysis, this report has identified emphasis areas to prioritize for improvement and to inform and further guide safety evaluation and planning for the City’s transportation network.

The emphasis areas are Impaired Driving, Vulnerable Road Users (Bicyclists and Pedestrians), and Aggressive Driving. The LRSP analyzed collision data on an aggregate basis as well as at specific locations to identify high-crash locations, high-risk locations, and city-wide trends and patters. The analysis of collision history on the City’s transportation network allows for opportunities to: 1) identify factors in the transportation network that inhibit safety for all roadway users, 2) improve safety at specific high-collision locations, and 3) develop safety measures using the 5E’s of transportation safety: Engineering, Enforcement, Education, Emergency Services, and Emerging Technologies, to encourage safer driver behavior and better severity outcomes.

Previous work conducted by the City of San Clemente has been successful at reducing the number of traffic injuries throughout the City, and this LRSP is the next step in taking those initiatives further. This is demonstrated in its California Office of Traffic Safety (OTS) rankings which identify the City as belonging to the top 40% percentile for safety compared to peer cities in its category. This LRSP analyzes the most recent six-year period of collision data (January 1, 2015 to December 31, 2019) and recent roadway improvements to assess historic trends, patterns, and areas of concern. Because of the unusual traffic conditions in 2020 due to the coronavirus pandemic, 2020 data was reviewed only at a qualitative level.

As part of the LRSP development process, the City drafted a vision for traffic safety and outlined the goals that will help mark plan success. The vision is to enhance the transportation network to continually reduce the number of traffic fatalities and serious injury related collisions. The goals were identified as:
x Identify areas with a high risk for collisions.
x Illustrate the value of a comprehensive safety program and the systemic process. x Plan future safety improvements for near-, mid- and long-term implementation. x Define safety projects for HSIP and other program funding consideration.

San Clemente’s collision history was analyzed to identify locations with elevated risk of collisions either through their collision histories or their similarities to other locations that have more active collision patterns. Using a network screening process, locations within the City that will most likely benefit from safety enhancements were identified. Using historic collision data, collision risk factors for the entire network were derived. The outcomes informed the identification and prioritization of engineering and non-infrastructure safety measures that address certain roadway characteristics and related behaviors that contribute to motor vehicle collisions with active transportation users. The figures below show the results of collision analysis, including the number of crashes that occurred at each intersection and along each roadway segment in the City.
5 SAN CLEMENTE LRSP 2022
iii
Number of Collisions per Intersection (2015-2019)
6 San Juan Capistrano
Legend
Intersection Collisions
•
N
C:J San Clemente Boundary
SAN CLEMENTE LRSP 2022
iv
Number of Collisions per Roadway Segment (2015-2019)
7 San Juan Capistra o
Legend
Mid-block Collisions
-- 0
1 - 2
3-6
- 7-9
D San Clemente !Boundary
Camp
Pendleton
SAN CLEMENTE LRSP 2022
v
Emphasis areas were developed through coordination with stakeholders, alignment with statewide safety priorities, and evaluation of the types of crashes most common in the City. The emphasis areas that were selected for priority enhancements were:

1. Impaired Driving

2. Vulnerable Road Users (Bicyclists and Pedestrians)

3. Aggressive Driving
The LRSP identified countermeasures for both infrastructure and non- infrastructure improvements. The report then applies Crash Modification Factors (CMFs), which are used to estimate the safety effects of safety improvements to compare and prioritize the improvements. This provides a planning level cost/benefit estimate that the City can use to prioritize improvements.

Site-specific opportunities for improvement were identified for the following 8 case study locations. The case study locations were chosen to be representative of the corridor and intersection designs throughout the City.

1. Segment: Calle del Cerro: Avenida Pico to Avenida Vista Montana (W)

2. Segment: Avenida Pico: I-5 Freeway to San Clemente High School

3. Intersection: I-5 Freeway & Avenida Pico

4. Intersection: El Camino Real & Calle Valle

5. Intersection: Avenida Palizada & El Camino Real

6. Segment: Ave del Mar: El Camino Real & Ola Vista

7. Segment: El Camino Real: Escalones to Avenida Barcelona (Downtown San Clemente)

8. Intersection: El Camino Real & Esplanade
The report also identifies opportunities that can be implemented systemically throughout the City. These opportunities were assembled into the “countermeasure toolbox” shown below, and include both engineering-based and non-engineering countermeasures.

Additionally, this information can be used to help the City apply for grants and other funding opportunities to implement these safety improvements. These measures can be applied where appropriate as part of ongoing City activities to improve overall safety performance.

City-wide Countermeasure Toolbox (Engineering Opportunities) LRSM ID1 Potential Countermeasures CRF Per Unit
Cost Unit
2 2084 Restrict right-turn on red 28% $10,000 per location 8498 Tighten radius of right-turn lane to
increase line of sight 39% $20,000 per location
NS06 Install/upgrade larger or additional
stop signs/other intersections 15% $1,500 per sign
1 S01 through S21PB: Intersection Countermeasures (Signalized) (Local Roadway Safety Manual) NS01 through NS23PB: Intersection Countermeasures (Unsignalized) (Local Roadway Safety Manual) R01 through R38 Roadway Countermeasures (Local Roadway Safety Manual) 2 Crash Modification Factors Clearinghouse ID-http://www.cmfclearinghouse.org/ 8 SAN CLEMENTE LRSP 2022
vi
LRSM ID1 Potential Countermeasures CRF Per Unit
Cost Unit
warning/regulatory signs (stop
signs with LED borders)
NS07 Upgrade intersection pavement
markings (to make more visible) 25% $22,000 per intersection NS07 Upgrade intersection pavement
markings (to make more visible) 35% $50,000 per mile
NS13 Install splitter-islands on the minor
road approaches 40% $20,000 per intersection
NS15
Create direction median openings
to allow/restrict left-turns and Uturns (right-in/right-out)50% $15,000 per structure R01 Add segment lighting 35% $50,000 per mile
R03 Install Median Barrier 25% $20,000 per location
R14 Change lane configurations 30% $12,500 per mile
R22 Install advanced signal warning
signage 15% $1,500 per sign
R23 Install chevron signs on horizontal
curves
40% $1,500 per sign
R26 Install dynamic/variable speed
warning systems 30% $16,000 per sign
R27 install delineators, reflectors, and or
object markers 15% $3,000 per LF
R32PB Install green paint in bicycle lanes 35% $15,000 per intersection R32PB Install bike lane (class III/sharrows) 35% $25 per linear foot S02 Update signal heads to meet
current standards
15% $12,000 per intersection
S03 Improve signal timing (coordination,
phasing, red, yellow, operation)
15% $7,667 per intersection
S07 Provide protected left-turn phase 30% $60,000 per intersection S18PB Install improved pedestrian
crossing
25% $50,000 per intersection
- Close intersection and allow only
pedestrian access to streets 5%* $15,000 per location
-
Enact ordinance restrict on-street
parking where curb lane width is
narrow
5%* $12,000 per location
- Install back-in packing 5%* $50,000 per location
- Install parking meters 5%* $75,000 per location
*These countermeasures do not have documented CRF’s and a conservative 5% CRF was assigned to allow them to show some benefit.

Non-Engineering Safety Strategy Countermeasures:

The identified non-engineering countermeasures below were derived from the collision analysis and build on existing efforts. These relate to the additional Es of Traffic Safety outside of 9 SAN CLEMENTE LRSP 2022
vii
Engineering. This includes Enforcement, Education, Emergency Services and Emerging Technologies.

City-wide Countermeasure Toolbox (Non-Engineering Opportunities)

PROPOSED

COUNTERMEASURE POTENTIAL PARTNERS EXAMPLES OF COUNTERMEASURE

ENFORCEMENT
Establish enforcement and
visibility program for aggressive
driving
Local law enforcement; CHP
CHP’s Regulate Aggressive
Driving and Reduce Speed
(RADARS) Program
Continued enforcement in
school zones
Local law enforcement; CHP;
school districts; OCTA; SCAG
Obtain grant funding for
additional personnel in school
zones
Increased enforcement of safe
driving & active transportation
behaviors near busy crosswalk
locations
Local law enforcement; CHP
Obtain grant funding for
additional enforcement near
high pedestrian activity locations

EDUCATION
Campaign to target aggressive
driving and DUIs
Local law enforcement; CHP;
California Office of Traffic Safety
(OTS)
CHP’s Regulate Aggressive
Driving and Reduce Speed
(RADARS) Program
Bicycle and pedestrian safety
campaign
Local law enforcement; OCTA;
SCAG
SCAG’s ‘Go Human’ Campaign;
‘ OTS’ ‘Ride With Traffic’
campaign
Planned educational events at
high activity locations such as
future CV Link locations
Explore safe routes to school
education grants to expand
program
Local school districts; local law
enforcement; OCTA; SCAG
Safe Routes to School Program,
funded by Caltrans
Coordinate safety education
campaigns with SCAG SCAG; local law enforcement
Roadway safety fairs at schools
Education campaign for aging
drivers

EMERGENCY SERVICES
Continue to work on
interdepartmental
communication between City
staff and City police department
and fire department
Local law enforcement & fire
department
Incorporate law enforcement/fire
department as stakeholders on
transportation improvement
projects
Incorporate public health
agencies and fire departments
as stakeholders in safety
projects
Local public health agencies
and fire departments
Adjust safety project
development processes to
include public health and fire
department feedback

EMERGING TECHNOLOGY
Continue to use best practices
for pedestrian crossings at high
pedestrian traffic areas
City Public Works; OCTA;
Caltrans
Continuously update pedestrian
crossing design standards in
accordance with latest best
practices
Utilize new data sources to
monitor traffic conditions and
inform County safety plans
City Public Works; OCTA;
Caltrans
Utilization of data from OCTA
traffic management center
10 SAN CLEMENTE LRSP 2022
viii

PROPOSED

COUNTERMEASURE POTENTIAL PARTNERS EXAMPLES OF COUNTERMEASURE Identify best practices for e-bike
safety and enforcement
City Public Works; local law
enforcement
Increased enforcement near ebike hotspots;
An evaluation and implementation plan were created that identifies actionable items that will help the City achieve the goals and vision set out in this report. This section laid out next steps for the City to continue to capitalize on the analysis and information provided in this report.
11 SAN CLEMENTE LRSP 2022
ix
Table of Contents
Executive Summary ................................................................................................................. ii 1 INTRODUCTION ............................................................................................. 1 2 VISION AND GOALS ...................................................................................... 2 3 PROCESS ....................................................................................................... 3

3.1 Existing Guidance ........................................................................................................ 3

3.2 Analysis Techniques .................................................................................................... 4

3.3 Statistical Performance Measures ................................................................................ 5 4 SAFETY PARTNERS ...................................................................................... 8

4.1 Stakeholder Meeting #1 & Field Tour ........................................................................... 8

4.2 Stakeholder Meeting #2 ............................................................................................... 9 5 EXISTING EFFORTS .................................................................................... 10 6 DATA SUMMARY ......................................................................................... 11

6.1 Roadway Network .......................................................................................................11

6.2 Intersections ...............................................................................................................11

6.3 Count Data .................................................................................................................11

6.4 Collision Data ..............................................................................................................11 7 COLLISION ANALYSIS RESULTS .............................................................. 18

7.1 All Collisions ...............................................................................................................18

7.2 Fatalities .....................................................................................................................19

7.3 Injury Levels................................................................................................................19

7.4 Cause of Collision .......................................................................................................19

7.5 Vulnerable Users ........................................................................................................22

7.6 Significant Trends for Passenger Vehicles ..................................................................25

7.7 Behavioral ...................................................................................................................25

7.8 Statewide Comparison ................................................................................................26

7.9 Collision Analysis Rankings ........................................................................................27 8 EMPHASIS AREAS ...................................................................................... 33 9 OPPORTUNITIES ......................................................................................... 35

9.1 Infrastructure Improvements .......................................................................................35

9.2 Non-Infrastructure Improvements ................................................................................36

9.3 General City-wide Countermeasure Toolbox...............................................................40 10 EVALUATION & IMPLEMENTATION ....................................................... 45

10.1 Evaluation ...................................................................................................................45 12 SAN CLEMENTE LRSP 2022
x

10.2 Implementation ...........................................................................................................45

10.3 Funding Opportunities .................................................................................................45

10.4 Next Steps ..................................................................................................................48 Table of Figures
Figure 1 – Critical Crash Rate Formula ...................................................................................... 6 Figure 2 – Probability of Specific Crash Types Exceeding Threshold Proportion ........................ 7 Figure 3: San Clemente Functional Classification (CRS) and Intersection Type........................12 Figure 4: All Collisions and Fatalities (2015-2019) ....................................................................13 Figure 5: Density of all Collisions at Intersections (2015-2019) .................................................14 Figure 6: Density of all Collisions at Intersections in Downtown San Clemente (2015-2019) .....15 Figure 7 – Density of all Collisions along Roadway Segments (2015-2019) ..............................16 Figure 8: Density of all Collisions along Roadway Segments in Downtown San Clemente ........17 Figure 9: Collision Type by Year (2015-2019) ...........................................................................18 Figure 10: Collisions by Injury Levels (2015-2019) ....................................................................19 Figure 11: Cause of Collisions (2015-2019) ..............................................................................20 Figure 12: Fatal & Severe Injury Collisions by Cause (2015-2019)............................................21 Figure 13: Pedestrian and Bicycle Collisions (2015-2019) ........................................................23 Figure 14: Pedestrian and Bicycle Collisions in Downtown San Clemente (2015 – 2019) .........24 Figure 15: DUI Collision Time of Day ........................................................................................25 Figure 16: DUI Collisions by Time of Week ...............................................................................26 Table of Tables
Table 1: Existing Documents Reviewed ....................................................................................10 Table 2: Fatal Collisions Categorized by Modes Involved (2015-2019) .....................................19 Table 3: Fatal & Severe Injury Collisions by Cause (2015-2019) ...............................................20 Table 4: Comparison of Statewide and San Clemente Fatal and Severe Injury Collisions .........26 Table 5: Analysis Rankings – Segments (Top Locations Per Segment Type) ...........................30 Table 6: Analysis Rankings – Intersections (Top Locations Per Intersection Type) ...................31 Table 8: Summary of Programs, Policies, and Practices for the City of San Clemente ..............36 Table 9: City-wide Recommended Safety Projects (Countermeasure Toolbox) .........................41 Table 10: Non-Engineering Safety Strategy Countermeasures .................................................43

13 SAN CLEMENTE LRSP 2022
1 1 Introduction
San Clemente is a lively coastal community in Southern Orange County known for its beaches, vibrant downtown, and rich history. San Clemente has a population of around 64,558 residents with a median age of 44 years old. With an economy based on tourism, retail, and light manufacturing, the City has varied transportation needs.

This Local Roadway Safety Plan (LRSP) identifies emphasis areas to focus and guide further safety enhancement to the City’s transportation network. The LRSP analyzes crash data on an aggregate basis as well as at specific locations to identify high-crash locations, high-risk locations, and city-wide trends and patterns. The analysis of crash history throughout the City’s transportation network provided the opportunity to: 1) identify factors in the transportation network that inhibit safety for all roadway users, 2) improve safety at specific high-crash locations, and 3) develop safety measures using the five E’s of safety: Engineering, Enforcement, Education, Emergency Services, and Emerging Technologies to encourage safer driver behavior and reduced collision severities.

The process and analysis performed for the City’s LRSP is described in this document. The plan includes a vision and associated goals for safety, crash history analysis, and specific emphasis areas that represent the most challenge for safety in the City. The plan provides a foundation for decision making and prioritization for safety countermeasures and projects that enhance safety for all modes.

San Clemente has been successful at taking steps to enhance safety for all modes throughout the City. This is supported by their California Office of Traffic Safety rankings identifying it amongst the top 40% tier for safety as compared to peer cities in most categories. This LRSP continues these safety efforts through this plan by identifying areas of emphasis and opportunities for system improvement that can be implemented to enhance safety. This LRSP analyzes the most recent 5-year period of available crash data (January 1, 2015 – December 31, 2019) and roadway improvements to assess historic trends, patterns, and areas of elevated collision activity.

The intent of the LRSP is to:
x Create a greater awareness of road safety and risks
x Reduce the number of fatal and severe-injury crashes
x Develop lasting partnerships
x Support for grant/funding applications, and
x Help prioritize investments in traffic safety.

14 SAN CLEMENTE LRSP 2022
2 2 Vision and Goals
The San Clemente LRSP evaluates the transportation network as well as non-infrastructure programs and policies within the City. Mitigation measures are evaluated using criteria to analyze the safety of road users (drivers, bicyclists, and pedestrians), the interaction of modes, influences on the roadway network from adjacent municipalities, and the potential benefits of safety countermeasures. This effort is intended to use historical data to identify trends and develop a toolbox of countermeasures applicable to conditions in the City that can be used for proactive identification and implementation of opportunities, without relying solely on a reaction and response to crashes as they occur.

LRSPs have been effective across the country as part of the effort to reduce fatal and severeinjury crashes because they provide a locally developed and customized roadmap to directly address the most common safety challenges in the given jurisdiction. Consistent with these findings, the following Vision, Goals, and Objectives have been established for this project.

VISION: To enhance the transportation network to achieve zero traffic fatalities and serious injury related crashes.

Goal #1: Identify areas with a high risk for collision.

Objectives:
x Identify intersections and segments that would most benefit from mitigation. x Identify areas of interest with respect to safety concerns for vulnerable users (pedestrians and bicyclists).

Goal #2: Illustrate the value of a comprehensive safety program and the systemic process.

Objectives:
x Demonstrate the systemic process’ ability to identify locations with higher risk for collisions based on present characteristics closely associated with severe collisions. x Demonstrate, through the systemic process, the gaps and data collection activities that can be improved upon.

Goal #3: Plan future safety improvements for near-, mid- and long-term.

Objectives:
x Identify safety countermeasures for specific locations (case studies). x Identify safety countermeasures that can be applied county-wide.

Goal #4: Define safety projects for future HSIP and other program funding consideration.

Objectives:
x Create the outline for a prioritization process that can be used in this and forth-coming cycles to apply for funding.
x Use the systemic process to create Project Case Studies. x Use Case Studies to apply for HSIP funding consideration. 15 SAN CLEMENTE LRSP 2022
3 3 Process
The following section describes the analysis process undertaken to evaluate safety within San Clemente at a systemic level. Using a network screening process, locations within the City that will most likely benefit from safety enhancements will be identified. Using historic collision data, collision risk factors for the entire network are derived. The outcomes will inform the identification and prioritization of engineering and non-infrastructure safety measures that address certain roadway characteristics and related behaviors that contribute to motor vehicle collisions with active transportation users.

The following section describes the analysis process undertaken to evaluate safety within San Clemente at a systemic level. Using a network screening process, locations within the City that will most likely benefit from safety enhancements will be identified. Using historic collision data, collision risk factors for the entire network are derived. The outcomes will inform the identification and prioritization of engineering and non-infrastructure safety measures that address certain roadway characteristics and related behaviors that contribute to motor vehicle collisions with active transportation users.

3.1 Existing Guidance
This process uses the latest National and State best practices for statistical roadway analysis described as follows.

3.1.1 Local Roads Safety Manual
The Local Roadway Safety Manual: A Manual for California’s Local Road Owners (Version 1.5, April 2020) purpose is to encourage local agencies to pursue a proactive approach to identifying and analyzing safety issues, while preparing to compete for project funding opportunities. A proactive approach is defined as analyzing the safety of the entire roadway network through either a one-time, network wide analysis, or by routine analyses of the roadway network.3 According to the Local Roadway Safety Manual (LRSM), “The California Department of Transportation (Caltrans) – Division of Local Assistance is responsible for administering California’s federal safety funding intended for local safety improvements.” To provide the most benefit and to be competitive for funding, the analysis leading to countermeasure selection should focus on both intersections and roadway segments and be considerate of roadway characteristics and traffic volumes. The result should be a list of locations that are most likely to benefit from cost-effective countermeasures, preferably prioritized by benefit/cost ratio. The manual suggests using a mixture of quantitative and qualitative measures to identify and rank locations that considers both crash frequency and crash rates. These findings should then be screened for patterns such as crash types and severity to aid in the determination of issues causing higher numbers of crashes and the potential countermeasures that could be most effective. Qualitative analysis should include field visits and a review of existing roadway characteristics and devices. The specific roadway context can then be used to assess what conditions may increase safety risk at the site and systematic level.
3 Local Roadway Safety Manual (Version 1.5) 2020. Page 5. 16 SAN CLEMENTE LRSP 2022
4 Countermeasure selection should be supported using Crash Modification Factors (CMFs).

These factors are the peer reviewed product of before and after research that quantifies the expected rate of collision reduction that can be expected from a given countermeasure. If more than one countermeasure is under consideration, the LRSM provides guidance on how to apply CMFs appropriately.

3.1.2 Highway Safety Manual
“The AASHTO Highway Safety Manual (HSM), published in 2010, presents a variety of methods for quantitatively estimating crash frequency or severity at a variety of locations.”4 This four-part
manual is divided into Parts: A) Introduction, Human Factors, and Fundamentals, B) Roadway Safety Management Process, C) Predictive Method, D) Crash Modification Factors.

Chapter 4 of Part B of the HSM discusses the Network Screening process. The Network Screening Process is a tool for an agency to analyze their entire network and identify/rank locations that (based on the implementation of a countermeasure) are most likely to least likely to realize a reduction in the frequency of collisions.

The HSM identifies five steps in this process:5

1. Establish Focus: Identify the purpose or intended outcome of the network screening analysis. This decision will influence data needs, the selection of performance measures and the screening method that can be applied.

2. Identify Network and Establish Reference Populations: Specify the types of sites or facilities being screened (i.e., segments, intersections, geometrics) and identify groupings of similar sites or facilities.

3. Select Performance Measures: There are a variety of performance measures available to evaluate the potential to reduce crash frequency at a site. In this step, the performance measure is selected as a function of the screening focus and the data and analytical tools available.

4. Select Screening Method: There are three principle screening methods described in this chapter (i.e., ranking, sliding window, peak searching). Each method has advantages and disadvantages; the most appropriate method for a given situation should be selected.

5. Screen and Evaluate Results: The final step in the process is to conduct the screening and analysis and evaluate the results.

The HSM provides several statistical methods for screening roadway networks to identify high risk locations based on overall collision histories. In addition to identifying the total number of collisions, this study uses a method referred to as Critical Crash Rate to analyze the data.

3.2 Analysis Techniques

3.2.1 Collision and Network Screening Analysis
Intersections and roadways were analyzed using four collision metrics:
x Number of Collisions
4 AASHTO, Highway Safety Manual, 2010, Washington D.C., http://www.highwaysafetymanual.org/Pages/About.aspx
5 AASHTO. Highway Safety Manual. 2010. Washington, DC. Page 4-2. 17 SAN CLEMENTE LRSP 2022
5 x Critical Crash Rate (HSM Ch. 4)
x Probability of Specific Crash Types Exceeding Threshold Proportion (HSM Ch. 4) x Equivalent Property Damage Only (HSM Ch. 4)
The initial steps of the collision analysis established sub-populations of roadway segments and intersections that have similar characteristics. For this study, intersections were grouped by their control type (Signalized, Unsignalized, Roundabout) and segments by their roadway category (Arterial, Collector, Minor Collector, Local). Individual collision rates were calculated for each sub-population. The population level crash rates were then used to assess whether a specific location has more or fewer crashes than expected. These sub-populations were also used to determine typical crash patterns to help identify locations where unusual numbers of specific crash types are seen.

The network screening process ranks intersections and roadway segments by the number of crashes that occurred at each one over the analysis period, and then identifies areas that had more of a given type of crash than would be expected for that type of location. These crash type factors were 1) collision injury (fatal, serious injury, other visible injury, complaint of pain, property damage only), 2) collision type (broadside, rear-end, sideswipe, head-on, hit object, overturned, bicycle, pedestrian, other), 3) environmental factors (lighting, wet roads), and 4) driver behavior (impaired, aggressive, and distracted driving). With these additional factors, the locations were further analyzed and assigned a new rank.

3.3 Statistical Performance Measures

3.3.1 Critical Crash Rate (CCR)
Reviewing the number of collisions at a location is a good way to understand the cost to society incurred at the local level but does not give a complete indication of the level of risk for those who use that intersection or roadway segment daily. The Highway Safety Manual describes the Critical Crash Rate method which provides a statistical review of locations to determine where risk is higher than that experienced by other similar locations. It is also the first step in analyzing for patterns that may suggest systemic issues that can be addressed at that location, and proactively at others to prevent new safety challenges from emerging.

The Critical Crash Rate compares the observed crash rate to the expected crash rate at a location based on facility type and volume using a locally calculated average crash rate for the specific type of intersection or roadway segment being analyzed. Based on traffic volumes and a weighted citywide crash rate for each facility type, a critical crash rate threshold is established at the 95% confidence level to determine locations with higher crash rates that are unlikely to be random. The threshold is calculated for each location individually based on its traffic volume and the crash profile of similar facilities.
18 SAN CLEMENTE LRSP 2022
6 Figure 1 – Critical Crash Rate Formula
Source: Highway Safety Manual
Data Needs
CCR can be calculated using:
x Daily entering volume for intersections, or VMT for roadway segments; x Intersection control types to separate them into like populations; x Roadway functional classification to separate them into like populations; x Collision records in GIS or tabular form including coordinates or linear measures.

Strengths
x Reduces low volume exaggeration
x Considers variance
x Establishes comparison threshold

3.3.2 CCR Methodology
The Process of analyzing the CCR and comparing locations (separately by intersections and segments) is a multi-step process. The following is a high-level description of the process undertaken to develop the initial ranking of locations.

The first step in the process was to establish a city-wide crash rate for each facility population.

These populations are broken into two categories with sub-categories:
x Intersection:
o Signalized
o Unsignalized
o Roundabout
x Roadway Classification:
o Other Principal Arterial
o Minor Arterial
19 R . = R + [p x ~ ] + [ l ] c,, a VMEV; (2 X (MEV; } ) Wh ere,
Re,; = Critical crash rate for intersection i
Ra= Weighted average crash rate for reference p opulation P = P -value for col'!'esp ondin g confidence level
ME V, = Million entering vehicles for intersec tion i
SAN CLEMENTE LRSP 2022
7 o Major Collector
o Local
The individual crash rate for each location was then calculated based on the associated traffic volume. This volume was either collected through data count resources or calculated based on the roadway classification. The next step was to establish a Significance Threshold. This Threshold was used to determine what level of exceedance (how much the crash rate exceeded the critical crash rate) a location must have based on traffic volume to provide a high level of confidence that the collision occurring at the location is not random. For this study, a confidence level of 95% was used. The local crash rates were then compared to Significance Threshold to see if each location exceeded the expected CCR and if so, by how much. This level of difference is known as Local CCR Differential and is shown in Table 5 and Table 6. After this analysis was completed, the locations were ranked by their categories according to that level of exceedance. A confidence level of 95% was used for the CCR Calculations. Locations where this level of difference is greater than zero are highlighted in gray in Table 5 and 6.

3.3.3 Probability
The Highway Safety Manual describes the methodology for determining the probability that crash type is greater than an identified threshold proportion. This helps to identify locations where a crash type is more likely to occur.

Data Needs
The probability of a specific crash type can be determined using collisions records with location data, and classifications of the locations (intersections or segments) studied.

Strengths
x Can be used as a diagnostic tool
x Considers variance in data
x Not affected by selection bias
The HSM methodology first determines the frequency of a specific collision type at an individual location, then determines the observed proportion of that collision type relative to all collision types at that location. A threshold proportion is then determined for the specific collision type; HSM suggests utilizing the proportion of the collision type observed in the entire reference population (e.g. throughout the entire City of San Clemente).

These proportions are then utilized to determine the probability that the proportion of a specific crash type is greater than the long-term expected proportion of that crash type.

Figure 2 – Probability of Specific Crash Types Exceeding Threshold Proportion 20 P(P; > P*; / N observedi / N observedj(TOTAJ = 1- betadisrtp *;/ a + N observedj / /3 + N observedj{lVTAL} - N observedj) SAN CLEMENTE LRSP 2022
8 Source: Highway Safety Manual

3.3.4 Equivalent Property Damage Only (EPDO)
The equivalent property damage only (EPDO) method is described in the Highway Safety Manual. This method assigns weighting factors to crashes based on injury level (severe, injury, property damage only) to develop a property damage only score. In this analysis, the injury crash costs were calculated for each location (based on the latest Caltrans injury costs). This figure is then divided by the injury cost for a property damage only crash. The resulting number is the equivalent number of property damage only crashes at each site. This figure allows all locations to be compared based on injury crash costs. (Highway Safety Manual, Chapter 4). 4 Safety Partners
As part of the LRSP, local stakeholders were included in the process to ensure the local perspective was kept at the forefront of this planning effort. In addition to the Project Team which included City Staff, a stakeholder group was organized. This group consisted of members from City departments, Capistrano Unified School District, the City’s Public Safety Committee, Orange County Sheriff’s Department, Orange County Fire Department, and local pedestrian and bicycle activists.

These leaders in the City and community were called together to offer insight on the safety issues present in the city’s transportation network. After the initial network screening and safety analysis, the stakeholder group met to discuss potential countermeasures and challenge areas.

The summary of the stakeholder meeting(s) are outlined below.

4.1 Stakeholder Meeting #1 & Field Tour
The first stakeholder meeting was conducted virtually using the Microsoft platform on October 11, 2021. At the meeting, stakeholders were introduced to the project and provided an overview of the data used, the required outputs, and the potential outcomes of the study.

In addition to the overview, Stakeholders were asked to provide local insight and knowledge at 10 “case study” locations that were identified after the initial network screening and crash analysis process. Potential countermeasures were recommended and discussed. Additionally, potential emphasis/challenge areas were proposed during the meeting to include impaired drivers, young drivers, and aggressive drivers.

Following the stakeholder kickoff meeting, a field tour of the “case study” locations was held on October 18, 2021 with members of the stakeholder group. The group visited each location and 21 Where:
•
p ; = Tlueshold proportion
P; = Observed proportion
Nobserved ,i = Observed target crashes for a site i
N = Total munber of crashes for a site i observed,i(TOTAL ) SAN CLEMENTE LRSP 2022
9 gave feedback on safety issues present at these locations. This feedback helped to develop the countermeasures explored later in the report.

4.2 Stakeholder Meeting #2
A 2nd stakeholder meeting was held on November 4, 2021 to discuss findings of the field tour, and to identify potential countermeasures and other opportunities for improvement at the case study locations and citywide.

Stakeholder feedback regarding the plan and opportunities were reviewed and incorporated into the study process for the development of the LRSP.

22 SAN CLEMENTE LRSP 2022
10 5 Existing Efforts
Existing plans, policies, and projects that were recently completed, planned, or are on-going within the City of San Clemente were compiled at the start of the LRSP process in order to gain perspective on the existing efforts for transportation-related improvements within the City. Highlevel key points regarding transportation improvements and safety-related topics were identified to inform decision making in this LRSP. Information reviewed included the following:

Table 1: Existing Documents Reviewed
Document Name Document Year Agency Document
Description
FY 2021 Capital Improvement
Plan
July 2019 for Fiscal
Year 2020-2021
City of San
Clemente
Summary of capital
projects for FY 2021
Centennial General Plan
(Mobility and Complete Streets
Section)
Adopted: February
2014
Amended:

December 2016
City of San
Clemente
Mobility/complete
streets plan
Bicycle and Pedestrian Master
Plan 2013 City of San Clemente
Bicycle/Pedestrian
Plan
Climate Action Plan January 2014 City of San
Clemente City Climate Plan
Downtown Paseos Plan December 2015 City of San
Clemente Design Plan
SCAG Strategic Plan 2018
Southern
California
Association of
Governments
(SCAG)
Strategic Plan
Local Profiles Report 2019:

Profile of the City of San
Clemente
May 2019 SCAG SCAG Profile of City
Connect SoCal: The 2020-2045
Regional Transportation Plan /
Sustainable Communities
Strategy of the Southern
California Association of
Governments
2020 SCAG SCAG Regional
Transportation Plan
OCTA Strategic Plan 2014 OCTA County
Transportation Plan

23 SAN CLEMENTE LRSP 2022
11 6 Data Summary

6.1 Roadway Network
The collision analysis is built upon the existing roadway network. The City’s Proposed Mobility and Complete Street from the adopted 2014 Centennial General Plan was used at the base network. Figure 3 illustrates San Clemente’s roadway network categorized using Caltrans’ Classification System. This classification assigned to each corridor roadway segment as either Other Principal Arterial, Minor Arterial, Major Collector, or Local road is used in the analysis process. Ultimately, corridors will be compared to roadway segments with similar designations.

6.2 Intersections
The collision analysis requires each intersection be classified by type: Signalized, Unsignalized, or Roundabouts. The safety analysis compares intersection safety performance to locations with similar control types. This information is also displayed in Figure 3.

6.3 Count Data
Vehicular count data is used as part of the analysis process to evaluate the impact of traffic and understand the natural hierarchy of the roadway network. Traffic volume data utilized for this project was pulled from the Master Plan of Arterial Highways volume model data from OCTA. For locations without volume, other resources were utilized to identify a reasonable assumption for individual corridors and classification types.

6.4 Collision Data
Collision data was collected from Crossroads Software for the period from January 1, 2015 through December 31, 2019 to have a complete set of collision data for analysis. We utilize fiveyears of data instead of the standard three to provide more history to evaluate trends or patterns. Analysis of the raw collision data is the first step in understanding the specific and systemic challenges faced throughout the City. Analyzing the five years of data provided insight on the following collision trends and patterns. The locations and amount of fatal and severe injury collisions are displayed in Figure 4. The density of collisions at intersections and along roadway segments is shown in Figures 5-8.
24 SAN CLEMENTE LRSP 2022
12 Figure 3: San Clemente Functional Classification (CRS) and Intersection Type 25 Capistrano
Legend
• Signalized Intersection
• Roundabout
-- Local
- MaJor Collector
- MinorArterial
- Other Prine ipal Arterial
c::::J San Clemente Boundary
Camp
endleton
N
A
SAN CLEMENTE LRSP 2022
13 Figure 4: All Collisions and Fatalities (2015-2019)
26 San Juan Capistrano
Legend
Schools
Severe Injury Collision
0 1
0 2
• 3
• 4
• 5
Fatal Collision
• 1
D San Clemente Boundary
SAN CLEMENTE LRSP 2022
14 Figure 5: Density of all Collisions at Intersections (2015-2019) 27 San Juan Capistrano
Legend
Intersection Collisions
•
N
c::J San Clemente Boundary A
SAN CLEMENTE LRSP 2022
15 Figure 6: Density of all Collisions at Intersections in Downtown San Clemente (2015- 2019)
28 Intersection Collis. • 1 ions
0 0
0 . 31
San Clemente
SAN CLEMENTE LRSP 2022
16 Figure 7 – Density of all Collisions along Roadway Segments (2015-2019) 29 San Juan Capistrano
Legend
Mid--block Collisions
-- 0
1 - 2
- 3-6
- 7-9
D San Clemente Boundary
Camp
Pendleton
SAN CLEMENTE LRSP 2022
17 Figure 8: Density of all Collisions along Roadway Segments in Downtown San Clemente (2015-2019)
30 Legend
Mid-block Collisions
-- 0
-- 1 -2
3-6
- 7 - 9
D San Clemente Boundary
SAN CLEMENTE LRSP 2022
18 7 Collision Analysis Results
The following section breaks down the collision data by a variety of input factors and user types.

This information will be used to highlight areas of concern for the City.

7.1 All Collisions
This report utilized collision data for a five-year period to provide a better understanding of trends and to reflect the patterns in crashes that have occurred on City streets. New data is added to the system in an ongoing basis which means that each time the City updates the analysis, a full 5-year draw from the database, rather than just adding records from the last query should be standard practice. Data used for this report were extracted from Crossroads Software analytics on June 29, 2021 and was current as of that date. Collision data from January 1, 2015 through December 31, 2019 as reported to Crossroads from the local enforcement indicated that during this time there were 1,336 collisions recorded within San Clemente.

The most common occurring collision types were Sideswipe (23%) and Rear-End (21%). The total number of collisions have been trending downward since 2016, with a significant 4% drop from 2016 to 20196
. In comparison with other cities nationwide, there has been an increasing trend of collisions from 2015 to 2019.

Figure 9: Collision Type by Year (2015-2019)
6 https://cdan.dot.gov/tsftables/National%20Statistics.pdf 0 50
100
150
200
250
300
350
2015 2016 2017 2018 2019
No. of Collisions
Year
Vehicle - Pedestrian
Sideswipe
Rear-End
Overturned
Other
Not Stated
Hit Object
Head-On
Broadside
31 ■
■
■
■
■
■
■
■
■
SAN CLEMENTE LRSP 2022
19 7.2 Fatalities
During the study period, seven (7) fatal and fifty-six (56) severe injury collisions occurred, as seen in Figure 4. These collisions were mainly concentrated along the City’s arterial roadways, such as El Camino Real, and Avenida Pico. As shown in Table 2 below, a majority fatal and severe injury collisions solely involved vehicles, but there were several collisions that involved pedestrians and bicyclists.

Table 2: Fatal Collisions Categorized by Modes Involved (2015-2019) Involved With # of Fatal Collisions # of Severe Injury Collisions Vehicle 5 42
Bicycle 1 5
Pedestrian 1 9

7.3 Injury Levels
Figure 10 reported during the time-period resulted in property damage only. Fatalities and severe injuries totaled less than 5% of all collisions.

Figure 10: Collisions by Injury Levels (2015-2019)

7.4 Cause of Collision
The highest cause of all collisions in San Clemente is improper turning at 25%, followed by driving under the influence at 16% and auto right-of-way violation at 15%. Issues with unsafe starting or backing also had a substantial impact on the City, comprising 7% of the collisions.

64.7%

16.8%

13.8%

4.2%

0.5%
Property Damage Only
Complaint of Pain
Other Visible Injury
Severe Injury
Fatal
32 ■
■
■
■
■
SAN CLEMENTE LRSP 2022
20 Drivers ignoring traffic signals and signs led to 6% of the collisions. shows the distribution of causes of collision in the study period.

Figure 11: Cause of Collisions (2015-2019)
In Figure 11 above, the bottom 10 causes of collisions are shaded white in the chart, and their percentages are listed in the legend of the chart.

The cause of the fatal & severe injury collisions is shown in Table 3 below. The most common cause for fatal and severe injury collisions is driving under the influence (71% and 19%, respectively).

Table 3: Fatal & Severe Injury Collisions by Cause (2015-2019) Collision Cause # of Fatal Collisions # of Severe Injury Collisions
Driving Under Influence 5 11
25%
16%
15%
15%
7%
6%
5%
2%
2%
Improper Turning
Driving Under Influence
Auto R/W Violation
Unsafe Speed
Unsafe Starting or Backing
Traffic Signals and Signs
Unknown
Other Than Driver or Ped
Unsafe Lane Change
Ped R/W Violation
Pedestrian Violation
Wrong Side of Road
Following Too Closely
Other Hazardous Movement
Other Improper Driving
Hazardous Parking
Improper Passing
Other

0.1% Impeding Traffic

0.4%

0.4%

0.4%

0.5%

0.7%

0.7%

0.8%

1.1%

1.3%
33 ■
■
■
■
■
■
■
■
■
■
SAN CLEMENTE LRSP 2022
21 Collision Cause # of Fatal Collisions # of Severe Injury Collisions
Improper Turning1 2 5
Auto R/W Violation2 - 9
Impeding Traffic3 - 1
Other Hazardous Movement - 3
Other Than Driver or Ped - 3
Ped R/W Violation - 1
Pedestrian Violation - 3
Traffic Signals and Signs4 - 3
Unknown - 8
Unsafe Speed - 6
Wrong Side of Road - 3
Figure 12: Fatal & Severe Injury Collisions by Cause (2015-2019) 1 Improper Turning is when a driver moves from a direct course when a movement cannot be made with reasonable safety, as defined by the California Vehicle Code (CVC) Section 22107. 2 Auto R/W Violation is when a driver fails to yield the right-of-way to a vehicle properly, as defined by CVC Section 21804.
3 Impeding Traffic is when a driver drives at such a slow speed as to impede or block normal movement of traffic, as defined by CVC Section 22400.
4 Traffic Signals and Signs is when a driver disobeys any traffic sign, signal or traffic control device, as defined by the CVC Section 38300.
0 2
4 6
8 10
12 14
16 2015 2016 2017 2018 2019
No. of Collisions
Year
Wrong Side of Road
Unsafe Speed
Unknown
Traffic Signals and Signs
Pedestrian Violation
Ped R/W Violation
Other Than Driver or Ped
Other Hazardous Movement
Improper Turning
Impeding Traffic
Driving Under Influence
Auto R/W Violation
34 ■
■
■
■
■
■
■
■
■
■
■
■
SAN CLEMENTE LRSP 2022
22 7.5 Vulnerable Users

7.5.1 Pedestrians
49 pedestrian involved collisions occurred during the study period, resulting in one (1) fatal collision, nine (9) severe injury, and 37 with some form of reported injury or pain. 38% of the pedestrian collisions occurred at night, and about half of these collisions occurred while the pedestrian was crossing the crosswalk.

7.5.2 Bicycle
During the study period, 58 collisions involving bicycles were reported. Of these, one (1) were fatal, and five (5) resulted in severe injuries. The remaining collisions resulted in five (5) property damage only, and 47with some form of reported injury or pain at night. 81% of the collisions occurred during daylight. Most of these collisions were attributed to automobile right-of-way violations.

Figure 13 and Figure 14 show the pedestrian and bicycle collisions in the City during the study period.
35 SAN CLEMENTE LRSP 2022
23 Figure 13: Pedestrian and Bicycle Collisions (2015-2019) 36 Juan Capistrano
Legend
Schools
Bicycle Collisions
Pedestrian Collisions
c::::J San Clemente Boundary
Camp
Pendleton
SAN CLEMENTE LRSP 2022
24 Figure 14: Pedestrian and Bicycle Collisions in Downtown San Clemente (2015 – 2019) 37 Legend
Schools
Bicycle Collisions
Pedestrian Collisions
D San Clemente Bo undary
SAN CLEMENTE LRSP 2022
25 7.6 Significant Trends for Passenger Vehicles
x Twenty-seven (27) percent of “party at fault” was drivers age 16 through 25. x Seventeen (17) percent of collisions (229) involved hit objects. Although significant in number, there are no discernable patterns to these collisions. x Nine (9) percent of the “party at fault” was attributed to those age 65 and older. Looking at the expanded range of the “party at fault” for age 55 and older, this group accounts for almost 17% of collisions. Specifics for driver gender was not available in the collision data. x Only four (4) percent of collisions (64) were recorded as having occurred at night without streetlights, or during dusk/dawn. Many of these collisions still occurred at or near intersections.

7.7 Behavioral

7.7.1 Driving Under the Influence
235 collisions, 18% of all collisions, were reported as the driver being under the influence of drugs or alcohol. More than half of collisions took place on arterial roads. Figure 15 and Figure 16 show the distribution of DUI collisions by time of day and day of the week.

Figure 15: DUI Collision Time of Day
0 5
10 15
20 25
30 12
AM
1 AM 2 AM 3 AM 4 AM 5 AM 6 AM 9 AM 10
AM
11 AM
12 PM
1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10
PM
11 PM
# of DUI Collisions
Time of Day
38 I I I - I I I I I -I I I
SAN CLEMENTE LRSP 2022
26 Figure 16: DUI Collisions by Time of Week

7.7.2 Aggressive Driving
Fifteen (15) percent of the collisions were primarily caused by drivers traveling at unsafe speed or following too closely. These types of collisions are located primarily on major arterials.

7.8 Statewide Comparison
The distribution of San Clemente’s fatal and severe injury collisions compared to statewide figures for several Caltrans Strategic Highway Safety Plan (SHSP) challenge areas is shown below in Table 4. Following the Caltrans SHSP Implementation Plan guidance, collision data from 2009 to 2018 was reviewed. The figures below may vary slightly from those mentioned previously due to the differences in the years of the study period. Compared to statewide collisions, the City of San Clemente had lower collisions involving commercial vehicles, young drivers, pedestrian, occupation protection, intersections, and aggressive driving. San Clemente had a higher proportion of fatal & severe injury collisions involving work zones, motorcyclists, aging drivers, bicyclists, impaired driving, distracted driving, and lane departures.

Table 4: Comparison of Statewide and San Clemente Fatal and Severe Injury Collisions (2009 - 2018)
Challenge Area Statewide
%
San
Clemente
%
%
Difference
San Clemente has a Higher Percentage of Collisions
Work Zones 1.5% 10.0% 8.5%
Motorcyclists 20.8% 26.1% 5.3%
Aging Drivers 11.9% 17.1% 5.1%
Bicyclists 8.4% 10.9% 2.5%
Impaired Driving 25.8% 26.5% 0.7%
Distracted Driving 5.2% 5.7% 0.5%
Lane Departure 43.7% 44.1% 0.4%
0 10
20 30
40 50
60 Monday Tuesday Wednesday Thursday Friday Saturday Sunday # of DUI Collisions
Day of the Week
39 I I I
SAN CLEMENTE LRSP 2022
27 Challenge Area Statewide
%
San
Clemente
%
%
Difference
San Clemente has a Lower Percentage of Collisions
Commercial Vehicles 6.4% 6.2% -0.2%
Young Drivers 13.6% 13.3% -0.3%
Pedestrians 19.1% 17.5% -1.6%
Occupant Protection 14.8% 12.3% -2.5%
Intersections 23.6% 19.4% -4.2%
Aggressive Driving 33.2% 26.5% -6.7%

7.9 Collision Analysis Rankings
Table 5 and Table 6 show the number of crashes occurring at locations in San Clemente by crash type for the locations that will be studied further in the Report, and highlights locations in which the probability of those crash types exceeding the threshold proportion is greater than 50%.

The tables are ordered by the number of collisions that occurred at that segment or intersection.

All intersections and segments with three or more crashes were included. Locations with fewer than three crashes do not have enough data to infer trends. locations where more than two collisions occurred are represented. At locations with two or less collisions, random chance can account for crash history as much or more than specific roadway characteristics.

The tables are separated into sub-sections visible by the blue gradient. The first two columns, Collisions and CCR, represent the level of crash activity in absolute terms, and as relative to other similar locations, respectively.

Per guidance from the Local Roadway Safety Manual (LRSM) each sub-population of locations was ranked according to the number of collisions. The second column shows the CCR differential, which highlights whether the collision activity was higher than the average for the sub-population based on the individual segment or intersection volume. This volume was either collected through data count resources or calculated based on the roadway classification. All averages used in the CCR calculation were established based on City of San Clemente crash data to determine what locations might be best to prioritize at the local level. This process highlights locations of collisions that are unusually high for the City to determine intersections and roadway segments that have the greatest risk for users. The remaining columns total collisions by type, to evaluate each sub-population and understand what proportion of crashes in the City are of a particular type. The city-wide proportion was compared with the local intersection or segment specific proportion to determine which locations have more of a given crash type than would be expected when considering the City average.

After this analysis was completed, the locations were ranked against other similar locations within the City by their categories according to the expected proportion of that crash type within San Clemente. Locations with higher than expected crashes of that type were identified by the probability that random chance would not account for exceedances. 40 SAN CLEMENTE LRSP 2022
28 The following provides an example of how to read Table 5 and Table 6, which show the top locations by collisions per type
Table Highlights
- Local CCR Differential:
o Locations with a Local CCR differential of greater than zero are highlighted in Gray - Fatal and Severe Injuries:
o Locations with one or more fatal/severe injuries are highlighted in Light Blue - Remaining Collision Types:
o Cells highlighted in Light Green have a 50% - 75% probability that this crash type is over-represented on this segment/intersection as compared to other characteristically similar locations within the City of San Clemente (as discussed in Section 4.3). Although these locations have a slightly higher probability of this crash type than their counterparts, they are not necessarily highly significant. o Cells highlighted in Light Yellow have a 75% or greater probability that this crash type is over-represented on this segment/intersection as compared to other characteristically similar locations within the City of San Clemente (as discuss in Section 4.3). These locations are highly significant in regard to the number of collisions occurring here and should be further investigated.

Table Definitions:
- Total Collisions: Number of collisions observed at the intersection or segment from January of 2015 through December of 2019.
o It should be noted that roundabouts were not listed in Table 4 - Local Critical Crash Rate (CCR) Differential: The CCR specific to the intersection or segment.
- Severity: The number of severe injury and fatal collisions that occurred at this location in the study period.
- Fatality: The number of fatal collisions that occurred at this location in the study period. - Broadside, Sideswipe, Rear-End, Head-On, Hit Object, Overturned, Other, Pedestrian, Bicycle: The number of these types of collisions that occurred at this location in the study period.
- Other: The number of miscellaneous collision types (mostly single vehicle) that occurred at this location in the study period.
- Aggressive, Distracted, Impaired, Dark, Wet: The number of the collisions with this factor identified as the cause of collision.

Additionally, it should be noted that the columns for Collision Type, Collisions Involved With, Collision Behavior, Collision Environment, and Collision Severity are additional characteristics of the collisions and should not be counted as a separate collision. The collision categories are labeled and highlighted in the following order:
41 1111
-
SAN CLEMENTE LRSP 2022
29 Collision Type: Broadside, Sideswipe, Rear-End, Head-on, Overturned, and Other Collision Involved With: Pedestrian and Bicycle
Collision Behavior: Aggressive, Distracted, and Impaired Collision Environment: Dark and Wet
Collision Severity: Fatal, Serious Injury, Other Visible Injury, Complaint of Pain, PDO 42 SAN CLEMENTE LRSP 2022
30 Table 5: Analysis Rankings – Segments (Top Locations Per Segment Type) Facility Limits
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Other Principal Arterial S el Camino Real E Ave Magdalena - I-5 Fwy Ramp 6 0.6 190 0 3 1 0 0 0 1 1 0 1 0 1 1 0 0 1 1 2 2Minor Arterial Ave del Mar N el Camino Real - N Ola Vista 9 2.8 9 0 3 1 1 2 0 2 0 0 1 0 0 0 2 0 0 0 0 9 Ave Pico I-5 Ramp - San Clemente High School 9 0.7 29 3 5 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 2 6 Ave Pico Calle del Cerro - Calle Amanecer 4 -0.08 34 0 0 3 0 0 0 1 0 1 3 0 0 0 0 0 0 2 2 0Ave Santa Barbara Ave Rosa - S Ola Vista 3 0.5 3 1 2 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 3Ave Vaquero Calle Vista Torito - Calle Arco 3 0.6 13 0 0 2 0 1 0 0 0 0 1 0 2 0 1 0 0 1 0 2Major Collector Cll del Cerro Ave Pico - Ave Vista Montana (W) 6 1.2 190 0 1 1 0 4 0 0 0 0 2 0 1 0 1 1 0 1 2 2Trafalgar Ln Trafalgar Ln - S Ola Vista 2 0.2 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2Local W Marquita N el Camino Real - Calle Puente 4 6.21 4 0 1 0 1 0 0 2 0 0 0 0 2 0 0 0 0 0 0 4 W Escalones N el Camino Real - Calle Puente 4 6.51 4 0 0 3 0 1 0 0 0 0 3 0 0 1 0 0 0 0 0 41. Local Critical Crash Rate Differential2. Equivalent Property Damage Only Crashes Local CCR Differential is Greater than Zero Fatal & Severe Injuries are greater than zero 50-75% probability that crash type is over-represented 75+% probability that crash type is over-represented 43 SAN CLEMENTE LRSP 2022
31 Table 6: Analysis Rankings – Intersections (Top Locations Per Intersection Type) Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Signalized Intersections San Diego Fwy & Ave Pico 31 0.5 275 8 5 7 2 5 0 1 3 2 9 0 3 0 1 0 1 3 10 17 W Ave Palizada & N El Camino Real 22 0.1 57 7 4 5 1 2 0 2 1 2 2 0 6 0 1 0 0 1 5 16San Diego Freeway & S El Camino Real 21 0.4 412 9 1 3 6 2 0 0 0 1 3 0 4 0 0 0 2 5 3 11Puerta del Sol & Ave Pico 18 0.2 77 6 0 6 2 4 0 0 0 0 9 0 5 0 0 0 0 4 4 10Ave la Pata & Ave Vista Hermosa 16 0.1 552 10 1 3 1 0 0 1 0 1 9 0 0 0 3 0 3 2 5 6 Ave Presidio & Ave Pico 16 -0.1 36 1 3 6 0 5 0 1 0 0 7 0 1 0 2 0 0 0 4 12 N el Camino Real & Ave del Mar 14 0.1 198 0 6 4 0 1 0 2 1 0 5 0 2 0 1 0 1 0 4 9S el Camino Real & Ave Rosa 13 0.0 42 4 1 2 4 0 0 2 1 1 3 0 1 0 1 0 0 3 0 10 Ave Pico & Camino Vera Cruz 13 0.0 211 3 3 3 2 2 0 0 0 0 4 0 1 0 1 0 1 3 1 8 I-5 Freeway & Camino De Los Mares 12 -0.03 191 4 4 1 0 1 1 0 1 0 5 0 3 0 1 0 1 0 3 8
Unsignalized Intersections W Canada & N El Camino Real 19 0.4 79 7 2 5 0 0 0 2 3 2 3 0 2 0 1 0 0 2 8 9 S El Camino Real & Ave Granada 18 0.3 196 3 6 6 0 0 0 1 2 1 6 0 3 0 0 0 1 1 1 15 S El Camino Real & W Esplande 12 0.1 364 8 1 1 0 1 1 0 0 0 0 0 2 0 0 0 2 1 3 6Ave Barcelona & S Ola Vista 9 0.4 226 0 4 0 1 1 0 2 1 2 1 0 1 0 0 0 1 5 1 2W Ave Palizada & Loma Ln 9 0.7 9 0 4 3 1 1 0 0 0 0 1 0 3 1 0 0 0 0 0 9Boca de la Playa & N El Camino Real 9 0.2 178 0 8 0 0 0 0 0 1 0 0 0 3 0 1 0 1 0 1 7 44 SAN CLEMENTE LRSP 2022
32 Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
S El Camino Real & Trafalgar Ln 8 0.1 38 2 2 0 1 1 1 1 0 0 1 0 3 0 0 0 0 2 2 4N El Camino Real & Ave Serra 8 0.1 13 2 3 2 0 0 0 1 0 0 2 0 0 0 2 0 0 0 1 7E Marquita & N El Camino Real 7 0.0 27 2 2 2 0 0 0 1 0 0 1 0 2 0 1 0 0 1 2 4W Escalones & N El Camino Real 7 0.1 7 3 4 0 0 0 0 0 0 0 0 0 2 0 1 0 0 0 0 71. Local Critical Crash Rate Differential 2. Equivalent Property Damage Only Crashes Local CCR Differential is Greater than ZeroFatal & Severe Injuries are greater than zero50-75% probability that crash type is over-represented 75+% probability that crash type is over-represented 45 SAN CLEMENTE LRSP 2022
33 8 Emphasis Areas
Emphasis Areas are places where the City of San Clemente can strategically focus efforts to have a large impact on transportation safety. Emphasis areas were developed by revisiting the Vision and Goals developed at the onset of this planning process and comparing them with the trends and patterns identified in the crash analysis. Where these areas aligned, or major challenges were observed, Emphasis Areas and strategies were developed.

Emphasis Area #1: Impaired Driving
Description: Impaired driving, as defined by the Caltrans SHSP, includes proof of drug or alcohol use by the driver, even if the driver is not over the legal limit. Approximately 18% of collisions during the study period reported the driver being under the influence of alcohol or drugs. About 14% of the collisions during the study period resulted in being over the legal limit.

More than half of these took place on arterial roadways. A majority of impaired driving collisions took place between 8 PM and 3 AM.

Goals for Emphasis Area #1:
x Reduce the incidence and severity of collisions attributed to impaired driving x Identify hot spots and key corridors for impaired driving x Apply for funding to implement countermeasures to reduce impaired driving collisions Strategies for Emphasis Area #1:
x Authorize, publicize, and conduct sobriety checkpoints programs x Implement an impaired driving education campaign
x Develop educational programs targeting specific audiences based on age group x Additional enforcement presence
x Create effective media campaigns in both visual and print media These strategies will be implemented by the City, law enforcement, and community organizations. Funding sources for these strategies may include Highway Safety Improvement Program (HSIP), Office of Traffic Safety (OTS), and Senate Bill 1 (SB1) grant programs.

Emphasis Area #2: Vulnerable Road Users (Bicycle and Pedestrians) Description: Pedestrians and bicyclists are classified by Caltrans as vulnerable road users, meaning they have the highest potential for severe harm during a crash. Pedestrian and bicycle activity is high in San Clemente. According to the crash analysis, 8 percent of crashes involved pedestrians and bicycles. 93% of these collisions resulted in some form of injury or pain. 20% of pedestrian collisions resulted in fatalities or severe injuries, and 10% of bicycle injuries resulted in fatalities or severe injuries. Electric bicycle (e-bike) usage is high in the City and special attention should be paid to safety of these users.

Goal for Emphasis Area #2:
x Reduce the number of collisions involving vulnerable road users x Identify hot spots and priority corridors for addressing vulnerable road user collisions x Apply for funding and implement countermeasures to address pedestrian & bicyclist collisions
46 SAN CLEMENTE LRSP 2022
34 Strategies for Emphasis Area #2:
x Implement pedestrian and bicycle countermeasures at key locations x Install active transportation counters to identify high volume locations and implement infrastructure improvements at these locations
x Establish education and training programs to improve vulnerable road user safety citywide, including focus on electric bicycles
These strategies can be implemented by the City, while partnering with Caltrans, Southern California Association of Governments (SCAG), California Highway Patrol (CHP) and other community partners. Funding sources for these strategies may include Highway Safety Improvement Program (HSIP), Active Transportation Program (ATP), State Transportation Improvement Program (STIP), and Senate Bill 1 (SB1) grand funding programs.

Emphasis Area #3: Aggressive Driving
Description: Aggressive driving, as defined by the Caltrans SHSP, includes several behaviors including speeding, tailgating, and ignoring traffic signals and signs. Aggressive driving behaviors (unsafe speed or following too closely) accounted for 15 percent of collisions. 3 percent of these collisions resulted in a severe injuries, 33 percent of these collisions resulted in some other form of injury.

Goal for Emphasis Area #3:
x Reduce the number of crashes due to aggressive driving in the City x Identify hot spots and priority corridors for aggressive driving x Apply for funding and implement countermeasures to address aggressive driving Strategies for Emphasis Area #3:
x Educational campaign to target aggressive drivers
x Increased law enforcement presence near aggressive driving hotspots x Increased coordination with law enforcement and other community organizations These strategies will be implemented by the City, law enforcement, and community organizations.

Funding sources for these strategies may include Highway Safety Improvement Program (HSIP), Office of Traffic Safety (OTS) and Senate Bill 1 (SB1) grant programs. 47 SAN CLEMENTE LRSP 2022
35 9 Opportunities
The following provides more information on general identified issues, crash modification factors, improvements, and countermeasures identified for the City of San Clemente, as well as for specific project locations identified as part of this analysis.

9.1 Infrastructure Improvements

9.1.1 Countermeasure Selection Process
Part D of the HSM provides information on Crash Modification Factors (CMF) for roadway segments, intersections, interchanges, special facilities, and road networks. CMFs are used to estimate the safety effects of highway improvements and apply CMFs to compare and select highway safety improvements. A CMF less than 1.0 indicates that a treatment has the potential to reduce collisions. A CMF greater than 1.0 indicates that a treatment has the potential to increase collisions. The application of an appropriate CMF can influence the decision to implement a particular project, and the misapplication of CMFs can lead to misinformed decisions. Key factors to consider when applying CMFs include:

1. Selection of an appropriate CMF,

2. Estimation of collisions without treatment,

3. Application of CMFs by type and severity, and

4. Estimation of the combined effect for multiple treatments Examples of Safety Countermeasures can be found through several sources. This Report utilizes the countermeasures found in the California LRSM (https://dot.ca.gov/-/media/dotmedia/programs/local-assistance/documents/hsip/2020/lrsm2020.pdf) and the CMF Clearinghouse (CMF CH) website (http://www.cmfclearinghouse.org/).

Countermeasures for each of the Safety Project Case Studies are based on the data analysis and site visits. Additional countermeasures were identified for the high-level issues on a citywide level and are discussed in General City-Wide Safety Project Recommendations Section

9.3 of this Report.

9.1.2 Safety Project Case Studies
From the city-wide analysis, ten project case study locations were selected for further analysis and recommendation. For each of these locations, Safety Project Case Studies were developed to provide a case study to organize projects when applying for funding. These locations were identified through the analysis process based on their collision histories, the observed crash patterns, and their differing characteristics to provide the most insight into potential systemic safety countermeasures that the City can employ to achieve the most cost-effective safety benefits.

A Safety Project Case Study was developed for these locations:

1. Segment: Calle del Cerro: Ave Pico to Ave Vista Montana (W)

2. Segment: Ave Pico: I-5 to San Clemente High School

3. Intersection: I-5 Fwy & Ave Pico

4. Intersection: El Camino Real & Calle Valle

5. Intersection: Ave Palizada & El Camino Real
48 SAN CLEMENTE LRSP 2022
36 6. Segment: Ave del Mar: El Camino Real & Ola Vista

7. Segment: El Camino Real: Escalones to Avenida Barcelona (Downtown San Clemente)

8. Intersection: El Camino Real & Esplanade
Appendix A contains the Case Study pages which summarize conditions at each location, and potentially beneficial countermeasures. Countermeasures were subjected to a benefit/cost assessment and scored according to their potential return on investment. These case studies can be used to select the most appropriate countermeasure, and to potentially phase improvements over the longer-term. The potential benefit of these countermeasures at locations with similar design characteristics can then be extrapolated regardless of crash history. These case study sheets can also be used to position the City for future grant funding opportunities.

9.2 Non-Infrastructure Improvements
Non-Infrastructure recommendations have also been proven to impact safety conditions of the transportation network. These education and enforcement measure recommendations are developed to target specific behavior types and populations. Based on a review of the existing plans, policies, and programs within the City, the following topics have been reviewed to identify areas where the City can implement or enhance safety efforts.

Table 7: Summary of Programs, Policies, and Practices for the City of San Clemente Topic Initiatives/ Current Status Implement or Enhance

COMMITTEES / ROLES
Active Transportation
Coordinator
Yes, Senior Traffic Engineering
and others fulfill this role Continue to grow this role Safety or Active
Advisory Committee
Yes, the City has a Public Safety
Committee
Continue regular Public
Safety Committee meetings
Active Transportation
Safety Education
Program
Sherriff & Schools work together
for bicycle safety education (bike
safety rodeo); possible
opportunities for additional
training related to e-bikes
Continue to expand
program for active
transportation safety

POLICY / PLANS
Complete Streets Plan Yes, City Complete Streets Plan
is part of the City's General Plan.

Identify roadways that are
good candidates for
complete street
implementation consistent
with guidance provided in
these plans
Traffic Impact Fees Yes Continue to assess traffic
impact fees
49 SAN CLEMENTE LRSP 2022
37 Topic Initiatives/ Current Status Implement or Enhance Safe Routes to School
Program
Multiple Safe Routes to School
grant funding projects
implemented in the past;
opportunity: comprehensive SRTS
plan
Complete a comprehensive
Safe Routes to School Plan
Traffic Calming Policies Yes
Continue to implement
traffic calming interventions
where appropriate
Speed Surveys Yes, the City conducts Speed
Surveys every 7 years
Continue to update as
required by California
Vehicle Code; review new
guidance from Assembly
Bill 43
Warrants for Stop Signs
and Signals
Yes, the City uses Warrants from
the CA MUTCD.

Continue to use CA
MUTCD warrants; identify
areas where additional
warrants can be used
Planning for Density and
Walkable Areas Yes
Continue to identify areas
for density and walkable
development
Transportation Demand
Management
(TDM)/Vehicle Miles
Travelled (VMT)
Reduction Policy
Currently providing shuttle
services down El Camino Real;
SC Rides, shuttles where there
are no bus routes
Continue to implement
policies that reduce VMT
Traffic Crash Monitoring No Implement a formal traffic
crash monitoring program
Active Transportation
Master Plan
Yes, the City has Bicycle and
Pedestrian Master Plan (BPMP).

Continue to regularly
update BPMP and
implement interventions laid
out in plans
Does the City have CA
MUTCD-compliant
Pedestrian Signal
Timing?
Yes
Continue to be aware of CA
MUTCD updates and
update timing regularly
Crosswalks at High
Pedestrian Locations Yes
Maintain and improve
crosswalks where
appropriate
Traffic Enforcement
The City contracts with the
Orange County Sheriff for traffic
enforcement. Traffic enforcement
type includes speeding, parking,
stop sign violation, and all
services under the California
Vehicle Code and San Clemente
Municipal Code.

Continue to work with law
enforcement to enforce
traffic safety; identify hot
spots and increase
enforcement
50 SAN CLEMENTE LRSP 2022
38 Topic Initiatives/ Current Status Implement or Enhance Bicycle Policy
City Bicycle Policy is in the City's
Bicycle and Pedestrian Master
Plan
Continue to update bicycle
policy and implement
bicycle interventions where
appropriate
Transit
Regional Rail Services (Metrolink
and Amtrak), OCTA buses, City
trolleys, SC Rides (supplementary
to reduced OCTA routes; through
Lyft/Butterfly); Senior Mobility
Program through Yellow Cabs
Improvements to shuttle
service along El Camino
Real.

Wayfinding
City has a Master Wayfinding
Sign Program for directional signs
for visitors to downtown, beaches,
pier, public parking and train
station.

Continue wayfinding
program; continually update
system

DATA COLLECTION / INVENTORY
Inventory of Pedestrian
Signs and Signals
Asset management program,
constantly updated. Currently
working on signage
Assemble inventory of
pedestrians signs/signals
Inventory/Mapping of
Active Transportation
Routes
No comprehensive map; mapped
on several different maps.

GIS/asset management programs
to work on compiling for sidewalks
Assemble comprehensive
GIS of active transportation
routes, including bikeways
and sidewalks
City Collision Database No, utilize Sherriff’s and TIMS Implement City collision
database with Sheriff and
TIMS data; update regularly
Active Transportation
Volume Counting
Ped/bike volumes are separated
on some volume counts
Continue counting active
transportation volumes;
assemble database of AT
volumes

COORDINATION / FEEDBACK
Citizen Feedback
The public can send feedback to
the City by phone calls, emails or
City website.

Continue to solicit citizen
feedback
Institutional
Coordination
The City coordinates with Caltrans
and other Agencies on various
type of projects as needed.

Continue interdepartmental
coordination
51 SAN CLEMENTE LRSP 2022
39 Topic Initiatives/ Current Status Implement or Enhance School Engagement
City provides adult school
crossing guards to elementary
and middle schools; coordinates
with the school staff and PTA on
traffic and transportation related
projects and issues.

Continue to engage local
school districts
Enforcement/Emergency
Service Engagement
The City law enforcement
services are provided by the
Orange County Sheriff. Law
enforcement services include
investigations, traffic enforcement,
community support, drug
education, parking control, and
crime prevention.

Continue to engage with
local law enforcement

52 SAN CLEMENTE LRSP 2022
40 9.3 General City-wide Countermeasure Toolbox
This evaluation considered city-wide trends to identify countermeasures that would likely provide the most benefit with widespread implementation. Countermeasures for each of the 5E Safety Strategies (Engineering, Enforcement, Education, Emergency Services, and Emerging Technologies) were identified. These include both infrastructure recommendations and noninfrastructure recommendations. Table 9 outlines the city-wide safety project recommendations, which is also referred to as the “Countermeasure Toolbox”. Within the toolbox, the description of the countermeasure along with its Local Road Safety Manuel (LRSM) ID number is listed. The next column, Crash Reduction Factor (CRF) also known as Crash Modification Factor (CMF), are “multiplicative factors used to estimate the expected number of crashes after implementing a given countermeasure at a specific site (the lower the CMF, the greater the expected reduction in crashes)7
.”
For each of these countermeasures, a planning level benefit/cost analysis was completed.

Applying the benefit/cost at the city-wide level was estimated assuming some randomness in crash distribution. The location characteristics, such as whether there is a traffic signal, and the type of crashes, were used at the city-wide level to calculate an average cost of crashes that the countermeasure might reduce. The benefit per location was then factored out to a 20-year lifecycle savings, with an Opinion of Project Probable Cost (OPCC) for the initial installation costs and a per-year maintenance cost estimate. The cost shown in Table 9 should be considered initial planning costs using 2020 dollars and not assumed final.

In addition to countermeasures from the LRSM which are included in Table 4, the following engineering improvements are recommended for consideration by the City for implementation. x Posting full time or part time “No Right Turn on Red” signs based on the frequency of collisions. Potential use of blankout signs at signalized intersection should be considered as they can be extended to part time No U Turn restrictions. x Implementation of CAMUTCD compliant signal timing at all intersections which has been shown in recent studies to help reduce pedestrian related collisions. x Policy to regularly evaluate sight distance and visual clearance issues within the City. In addition to built obstructions, landscaping has become an increasingly important issue and is a factor in collisions.
x Restriping corridors to narrow travel and turn lanes widths, using the additional space to stripe wider bicycle facilities.
x Installation of bike detection and bike call buttons at signalized intersections.

Table 10 describes additional recommendations for the remaining categories of traffic safety which includes Enforcement, Education, Emergency Services, and Emerging Technology.

7 LRSM Version 1.5 (2020), Page 27
53 SAN CLEMENTE LRSP 2022
Table 8: City-wide Recommended Safety Projects (Countermeasure Toolbox) LRSM/ CMF ID Potential Countermeasures CRF Per Unit Cost Unit 2084 Restrict right-turn on red 28% $10,000 per location8498 Tighten radius of rightturn lane to increase
line of sight
39% $20,000 per location
NS06
Install/upgrade larger or
additional stop
signs/other intersections
warning/regulatory
signs (stop signs with
LED borders)
15% $1,500 per sign
NS07
Upgrade intersection
pavement markings (to
make more visible)
25% $22,000 per intersection
NS07
Upgrade intersection
pavement markings (to
make more visible)
35% $50,000 per mile
NS13
Install splitter-islands on
the minor road
approaches
40% $20,000 per intersection
NS15
Create direction median
openings to
allow/restrict left-turns
and U-turns (rightin/right-out)
50% $15,000 per structure
R01 Add segment lighting 35% $50,000 per mileR03 Install Median Barrier 25% $20,000 per locationR14 Change lane configurations 30% $12,500 per mileR22 Install advanced signal warning signage 15% $1,500 per signR23 Install chevron signs on horizontal curves 40% $1,500 per sign 54 SAN CLEMENTE LRSP 2022
42 LRSM/ CMF ID Potential Countermeasures CRF Per Unit Cost Unit R26 Install dynamic/variable speed warning systems 30% $16,000 per signR27 install delineators,
reflectors, and or object
markers
15% $3,000 per LF
R32PB Install green paint in bicycle lanes 35% $15,000 per intersectionR32PB Install bike lane (class III/sharrows) 35% $25 per linear foot S02 Update signal heads to meet current standards 15% $12,000 per intersectionS03 Improve signal timing
(coordination, phasing,
red, yellow, operation)
15% $7,667 per intersection
S07 Provide protected left- turn phase 30% $60,000 per intersection S18PB Install improved pedestrian crossing 25% $50,000 per intersection -
Close intersection and
allow only pedestrian
access to streets
5%* $15,000 per location
-
Enact ordinance restrict
on-street parking where
curb lane width is
narrow
5%* $12,000 per location
- Install back-in packing 5%* $50,000 per location- Install parking meters 5%* $75,000 per location *These countermeasures do not have documented CRF’s and a conservative 5% CRF was assigned to allow them to show some benefit. 55 SAN CLEMENTE LRSP 2022
43 Non-Engineering Safety Strategy Countermeasures: These recommended countermeasures were derived from the collision analysis and build on the actions identified in Section 9.2. These relate to the additional Es of Traffic Safety outside of Engineering. This includes Enforcement, Education, Emergency Services and Emerging Technologies.

Table 9: Non-Engineering Safety Strategy Countermeasures PROPOSED COUNTERMEASURE POTENTIAL PARTNERS EXAMPLES OF COUNTERMEASURE ENFORCEMENT Establish enforcement and visibility program for aggressive driving Local law enforcement; CHP CHP’s Regulate Aggressive Driving and Reduce Speed (RADARS) ProgramContinued enforcement in school zones Local law enforcement; CHP; school districts; OCTA; SCAG Obtain grant funding for additional personnel in school zonesIncreased enforcement of safe driving & active transportation behaviors near busy crosswalk locations Local law enforcement; CHP
Obtain grant funding for additional enforcement near high pedestrian activity locations EDUCATION Campaign to target aggressive driving and DUIs Local law enforcement; CHP; California Office of Traffic Safety (OTS) CHP’s Regulate Aggressive Driving and Reduce Speed (RADARS) Program Bicycle and pedestrian safety campaign Local law enforcement; OCTA; SCAG SCAG’s ‘Go Human’ Campaign; ‘ OTS’ ‘Ride With Traffic’ campaignPlanned educational events at high activity locations such as future CV Link locations Explore safe routes to school education grants to expand program Local school districts; local law enforcement; OCTA; SCAG Safe Routes to School Program, funded by Caltrans
Coordinate safety education campaigns with SCAG SCAG; local law enforcement Roadway safety fairs at schools Education campaign for aging driversEMERGENCY SERVICES Continue to work on interdepartmental communication between City staff and City police department and fire department Local law enforcement & fire department
Incorporate law enforcement/fire department as stakeholders on transportation improvement projects 56 SAN CLEMENTE LRSP 2022
44 PROPOSED COUNTERMEASURE POTENTIAL PARTNERS EXAMPLES OF COUNTERMEASURE Incorporate public health agencies and fire departments as stakeholders in safety projects Local public health agencies and fire departments
Adjust safety project development processes to include public health and fire department feedback EMERGING TECHNOLOGY Continue to use best practices for pedestrian crossings at high pedestrian traffic areas City Public Works; OCTA; Caltrans Continuously update pedestrian crossing design standards in accordance with latest best practices Utilize new data sources to monitor traffic conditions and inform County safety plans City Public Works; OCTA; Caltrans Utilization of data from OCTA traffic management center Identify best practices for e-bike safety and enforcement City Public Works; local law enforcement Increased enforcement near e-bike hotspots; 57 SAN CLEMENTE LRSP 2022
10 Evaluation & Implementation

10.1 Evaluation
The success of the LRSP will be evaluated using the preliminary process outlined below. This process will be useful to ensure proper implementation of goals and to determine when updates are needed.
x Quarterly progress meetings will be conducted to track the implementation of the plan. In addition, the success of the plan will be evaluated on an annual basis. x An update to the plan should be considered after no more than five years. x Continued monitoring and recording of traffic incidents on local roadways by law enforcement.
x Maintain a list of focus areas where there are transportation safety concerns.

10.2 Implementation
The opportunities identified in this report provide more of the systemic countermeasures that can be applied within the City. Over the next three to five years, the City has the opportunity to concentrate its efforts on the emphasis areas:

1. Impaired Driving

2. Vulnerable Road Users (Bicyclists and Pedestrians)

3. Aggressive Driving
Analysis conducted at the citywide level indicated that these factors were some of the most frequent influences contributing to collisions within the City. The countermeasure opportunities previously discussed in this report for both systemic and project-specific improvements can be used as a basis for developing projects at locations where addressing these focus areas would be of the most benefit. Projects that address these focused areas can be developed with a high benefit-to-cost ratio (by applying City-wide collision rates), allowing projects to be developed even at sites with little to no direct collision history, but with conditions that might contribute to future collisions.

10.3 Funding Opportunities
Competitive funding resources are available to assist in the development and implementation of safety projects in San Clemente. The City should continue to seek available funding and grant opportunities from local, state, and federal resources to accelerate their ability to implement safety improvements throughout San Clemente. The following is a high-level introduction into some of the main funding programs and grants for which the City can apply. The City should also work with regional agencies such as OCTA and SCAG to identify and apply for safety improvement funding.

10.3.1 Highway Safety Improvement Program
The Highway Safety Improvement Program (HSIP) is a Federal program housed under Fixing America’s Surface Transportation (FAST) Act. This program apportions funding as a lump sum for each state, which is then divided among apportioned programs. These flexible funds can be 58 SAN CLEMENTE LRSP 2022
46 used for projects to preserve or improve safety conditions and performance on any Federal-aid highway, bridge projects on any public road, facilities for non-motorized transportation, and other project types. Example safety improvement projects eligible for this funding include:
x New or upgraded traffic signals
x Upgraded guard rails
x Pedestrian warning flashing beacons
x Marked crosswalks
California’s local HSIP focuses on infrastructure projects with national recognized crash reduction factors. Normally HSIP call-for-projects is made at an interval of one to two years. The applicant must be a city, a county, or a tribal government federally recognized within the State of California.

Additional information regarding this program at the Federal level can be found online at:
https://safety.fhwa.dot.gov/hsip/. California specific HSIP information – including dates for upcoming call for projects - can be found at: http://www.dot.ca.gov/hq/LocalPrograms/hsip.html.

10.3.2 Caltrans Active Transportation Program
Caltrans Active Transportation Program (ATP) is a statewide funding program, created in 2013, consolidating several federal and state programs. The ATP funds projects that encourage increased mode share for walking and bicycling, improve mobility and safety for non-motorized users, enhance public health, and decrease greenhouse gas emissions. Projects eligible for this funding include:
x Bicycle and pedestrian infrastructure projects
x Bicycle and pedestrian planning projects (e.g. safe routes to school) x Non-infrastructure programs (education and enforcement) This program funding is provided annually. The ATP call for projects typically comes out in the spring. Information on this program and cycles can be found online at:
http://www.dot.ca.gov/hq/LocalPrograms/atp/

10.3.3 State Transportation Improvement Program
The State Transportation Improvement Program (STIP) provides state and federal gas tax money for improvements both on and off the state highway system. STIP programming occurs every two years. The programming cycle begins with the release of a proposed fund estimate, followed by California Transportation Commission (CTC) adoption of the fund estimate. The fund estimate serves to identify the amount of new funds available for the programming of transportation projects. Once the fund estimate is adopted, Caltrans and the regional planning agencies prepare transportation improvement plans for submittal. Caltrans prepares the Interregional Transportation Improvement Program (ITIP) using Interregional Improvement Program (IIP) funds, and regional agencies prepare Regional Transportation Improvement Programs (RTIPs) using Regional Improvement Program (RIP) funds. The STIP is then adopted by the CTC.
59 SAN CLEMENTE LRSP 2022
47 10.3.4 California Senate Bill 1 (SB 1)
SB 1 is a landmark transportation investment to rebuild California by fixing neighborhood streets, freeways and bridges in communities across California and targeting funds toward transit and congested trade and commute corridor improvements.

California’s state-maintained transportation infrastructure will receive roughly half of SB 1 revenue: $26 billion. The other half will go to local roads, transit agencies and an expansion of the state’s growing network of pedestrian and cycle routes. Each year, this new funding will be used to tackle deferred maintenance needs both on the state highway system and the local road system, including:
x Bike and Pedestrian Projects: $100 million
o This will go to cities, counties and regional transportation agencies to build or convert more bike paths, crosswalks and sidewalks. It is a significant increase in funding for these projects through the Active Transportation Program (ATP). x Local Planning Grants: $25 million

10.3.5 California Office of Traffic Safety (OTS) Grants This program has funding for projects related to traffic safety, including transportation safety education and encouragement activities. Grants applications must be supported by local crash data (such as the data analyzed in this report) and must relate to the following priority program areas:
x Alcohol Impaired Driving
x Distracted Driving
x Drug-Impaired Emergency Medical Services
x Motorcycle Safety
x Occupant Protection
x Pedestrian and Bicycle Safety
x Police Traffic Services
x Public Relations, Advertising, and Marketing Program
x Roadway Safety and Traffic Records

10.3.6 SCAG Sustainable Communities Program (SCP)
This program is an innovative vehicle for promoting local jurisdictional efforts to test local planning tools. The SCP provides direct technical assistance to SCAG member jurisdictions to complete planning and policy efforts to implement the regional Sustainable Communities Strategies (SCS). Grants are available in the following three categories:
x Integrated Land Use
o Sustainable Land Use Planning
o Transit Oriented Development (TOD)
o Land Use & Transportation Integration
x Active Transportation
o Bicycle Planning
o Pedestrian Planning
o Safe Routes to School Plans
60 SAN CLEMENTE LRSP 2022
48 x Green Region
o Natural Resource Plans
o Climate Action Plans (CAPs)
o Green House Gas (GHG) Reduction programs

10.4 Next Steps
The City of San Clemente has completed this LRSP to guide the process of future transportation safety improvements for years to come. The data-driven analysis process identified collision types, related primary collision factors, and locations of many collisions.

Based on this process, Emphasis Areas were developed. These Emphasis Areas will guide corridor improvements, education programs, and capital improvements for the City.

Using the analyzed data and outputs from this LRSP, the City has the opportunity to complete the following tasks:
x Actively seek other funding opportunities to improve safety for all modal users x Collaborate with established safety partners & neighboring municipalities as improvements are made to create a cohesive transportation network x Iteratively evaluate existing and proposed transportation safety programs and capital improvements to design a safer transportation network in San Clemente x Continually review collision data and update the analysis performed in this report x Monitor collision activity at locations where improvements were made to determine their impacts
The City also plans to have the City Council formally approve and adopt the Local Road Safety Plan (LRSP) in 2021. Based on current Caltrans guidelines, the City can plan to update the LRSP in five years in 2026.

61 SAN CLEMENTE LRSP 2022
Appendix A: Case Study Sheets

62 Project Template: Location #1
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Project Location Description & Maps:

Segment: Calle Del Cerro: Avenida Pico to Ave Vista Montana (W) Similar Segments: Calle Frontera: Ave Pico to Ave Fuentes/Ave Faceta; Camino Vera Cruz: Ave Vista Hermosa to Calle Paradiso
7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
$YHUDJH'DLO\7UDIƄF
$'7
32,713
Lighting Yes
Highest Posted Speed Limit 35 MPH
Collision Data
7RWDO&ROOLVLRQV



6 Fatal and Injury
Collisions
Fatal Injury - 1
Severe Injury - 0
Visible Injury - 1
Top 3 Collision Types

SHUFHQWDJH

Hit-Object (66%)
Rear-End (16%)
Sideswipes(16%)
Total Nighttime Collisions 3
Wet Surface Collisions 1

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
6--
N
6(*0(17
Avenida Pico
Additional Notes:
• Trucks restrictions (no trucks over 4
tons)
• Bike lanes prefer uphill instead of
downhill
• Tree removal from medians, causing
roads to lift
• Speed feedback signs could have more
visibility
• Lighting is an issue here when there is
weather
Calle del Cerro
N
Avenida Vista
0RQWDQD
:

Collision Trends:

Type of
Collision Total
Hit-Object 4
Rear-End 1
Sideswipe 1
A-1
63 0
u
0 2015 2016 2017
Years
I
2018 2019
Kimley >>> Horn
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
&UDVK0RGLƄFDWLRQ
Factor

/560&0),'

<HDU
6DIHW\%HQHƄW
Total
<HDU
Costs
Safety
Related
%&
All
Install/upgrade signs with
QHZƅXRUHVFHQWVKHHWLQJ
(regulatory or warning)

0.85 (R22) $1,512,420 $1,500 1008.28
All Install Chevron signs on
horizontal curves

0.60 (R23) $4,033,120 $9,000 448.12
All Install curve advance
warning signs

0.75 (R24) $2,520,700 $6,000 420.12
All Install dynamic/variable
speed warning signs

0.70 (R26) $3,024,840 $16,000 189.05
All ,QVWDOOGHOLQHDWRUVUHƅHFWRUV
and/or object markers

0.85 (R27) $1,512,420 $20,000 75.62
Dark
Perform lighting study;
install additional lighting if
necessary
- - $50,000 -
A-2 Kimley >>> Horn 64
Project Template: Location #2
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Project Location Description & Maps:

Segment: Avenida Pico: I-5 NB to San Clemente High School Similar Segments: Ave Pico: Calle Frontera to Calle del Cerro; Ave Vista Hermosa: Camino Vera Cruz to Sports Park 7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
$YHUDJH'DLO\7UDIƄF
$'7
42,481
Lighting Yes
Highest Posted Speed Limit 35 MPH
Collision Data
7RWDO&ROOLVLRQV



9 Fatal and Injury
Collisions
Fatal Injury - 0
Severe Injury - 0
Visible Injury - 0
Top 3 Collision Types

SHUFHQWDJH

Broadside (33%)
Sideswipes (33%)
Hit-Objects (22%)
Total Nighttime Collisions 2
Wet Surface Collisions 0

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
9--
N
6(*0(17
,
Additional Notes:
• Bike lane on WB segment does not
extend past east of I-5.
• If we installed a bike lane on southern
VLGHWKHUHPD\EHDULJKWWXUQFRQƅLFW
by high school
Avenida Pico
N
San
High School
Clemente
Collision Trends:
0 1
2 3
2015 2016 2017 2018 2019
Number of Collisions
Type of
Collision Total
Broadside 3
Sideswipe 3
Hit-Object 2
Rear-end 1
Before Median
Implementation
(2014)
5 collisions
After Median
Implementation
(2015-2019)
9 collisions
A-3
65 I I
Kimley >>> Horn
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
&UDVK0RGLƄFDWLRQ
Factor

/560&0),'

<HDU
6DIHW\%HQHƄW
Total
<HDU
Costs
Safety
Related
%&
Ped &
Bike
Install bike lanes on
northern side of Ave Pico

0.65 (R32PB) - $15,000 -
Ped &
Bike
Install crosswalk
by San Clemente High
School (Avenida Pico & San
Clemente High school)

0.75 (S18PB) - $50,000 -
A-4 Kimley >>> Horn 66
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Case Study Sheet: Location #3
Project Location Description & Maps:

Intersection: I-5 (San Diego Fw) + Ave Pico
Examples of Similar Intersections: I-5 & El Camino Real; I-5 & Camino de Estrella 7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
Number of Approaches 6
Total Entering Vehicles 42,481
Crosswalk Condition Crosswalk
Control Type Signalized
Lighting Yes
Highest Posted Speed Limit 35MPH
Median East & West
approaches
Collision Data
Total Collisions(2015-2019) 31
Fatal and Injury
Collisions
Fatal Injury - 0
Severe Injury - 1
Visible Injury - 3
Top 3 Collision Types Broadside (25%)
Rear-end (22%)
Sideswipe (16%)
Total Nighttime Collisions 8
Wet Surface Collisions 1

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
26 3 2
N N
E Avenida Pico
San Diego Fwy
Collision Trends:
0 1
2 3
4 5
6 7
8 9
10 2015 2016 2017 2018 2019
Number of Collisions
Years
Type of Collision Total
Broadside 8
Rear-End 7
Hit-Object 5
Sideswipe 5
Vehicle-Pedestrian 3
Head-On 2
Other 1
Collision Trends:

A-5 67
I l
I I
Kimlev>>>Horn
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
Crash
0RGLƄFDWLRQ
Factor (LRSM/

CMF ID)
20 Year
Safety
%HQHƄW
Total 20-Year
Costs Safety Related B/C
Right-Turn
from I-5
Ramp
Restrict right turns on red from
NB Off-Ramp

0.73 (CMF 2084) $2,601,610 $10,000 260.16
All Tighten radius on right turn(I5NB off-ramp)

0.61 (CMF 8498) $3,689,556 $20,000 184.48
Additional Notes:
• Opportunities for intersection control analysis and queue analysis • Caltrans and City coordination necessary for this location A-6 Kimlev>>>Horn 68
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Case Study Sheet: Location #4
Project Location Description & Maps:

Intersection: El Camino Real + Calle Valle
Examples of Similar Intersections: El Camino Real & Calle Las Bolsas; El Camino Real & Calle Lago 7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
Number of Approaches 3
Total Entering Vehicles 25,500
Crosswalk Condition East side crosswalk
Control Type Unsignalized
Lighting Yes
Highest Posted Speed Limit 35MPH
Median None
Collision Data
Total Collisions(2015-2019) 3
Fatal and Injury
Collisions
Fatal Injury - 0
Severe Injury - 0
Visible Injury - 1
Top Collision Types Other (33%)
Sideswipe (66%)
Total Nighttime Collisions 0
Wet Surface Collisions 0

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
201
N N
Calle Valle
El Camino Real
Additional Notes:
• Steep grade
• Blind side – left turn
• Potential exit closure
Collision Trends:
0 1
2 3
2015 2016 2017 2018 2019
Number of Collisions
Years
Type of Collision Total
Sideswipe 2
Other 1 A-7 69
I I
Kimlev>>>Horn
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
Crash
0RGLƄFDWLRQ
Factor (LRSM/

CMF ID)
20 Year
Safety
%HQHƄW
Total 20-Year
Costs Safety Related B/C
All
Install median to restrict leftturns from El Camino Real to Calle Valle
40%
(NS13) $270,240 $25,000 10.81
A-8 Kimlev>>>Horn 70
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Case Study Sheet: Location #5
Project Location Description & Maps:

Intersection: W Ave Palizada+ El Camino Real
Examples of Similar Intersections: El Camino Real & Avenida Presidio; El Camino Real & Avenida Valencia 7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
Number of Approaches 4
Total Entering Vehicles 34,500
Crosswalk Condition Crossing with
pedestrian timing
Control Type Signalized
Lighting Yes
Highest Posted Speed Limit 30MPH
Median None
Collision Data
Total Collisions(2015-2019) 22
Fatal and Injury
Collisions
Fatal Injury - 0
Severe Injury - 0
Visible Injury - 1
Top 3 Collision Types Broadside (31%)
Rear-end (22%)
Sideswipe (18%)
Total Nighttime Collisions 8
Wet Surface Collisions 0

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
19 1 2
Ave Palizada
N N
El Camino Real
Collision Trends:
0 1
2 3
4 5
6 7
8 9
10 2015 2016 2017 2018 2019
Number of Collisions
Years
Type of Collision Total
Broadside 7
Rear-End 5
Sideswipe 4
Other 4
Hit-Object 2
Head-On 1
Pedestrain-Vehicle 1
Collision Trends:

A-9
71 I I I
Kimlev>>>Horn
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
Crash
0RGLƄFDWLRQ
Factor (LRSM/

CMF ID)
20 Year
Safety
%HQHƄW
Total 20-Year
Costs
Safety
Related B/C
All
Enact ordinance restrict onstreet parking where curb lane width is narrow

0.95 $151,920 $12,000 12.66
Collisions
at Old
Town Plaza
Entrance
Install “keep clear” marking for
left turn into Old Town Plaza 0.95 $40,340 $15,000 2.69 All
Intersection control evaluation

LQFOXGLQJUHFRQƄJXUDWLRQDQG
re-striping)
- - $30,000 -
Additional Notes:
• Left turns at Ave Palizada and Ave de la Estrella create queues • Restriping needed
• /DQHFRQƄJXUDWLRQXSJUDGHVSRVVLEOH
A-10 Kimlev>>>Horn 72
Project Template: Location #6
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Project Location Description & Maps:

Segment: Ave Del Mar: N El Camino Real to N Olas Vista
Similar Segments: Avenida del Mar: Ola Vista to Calle Seville; Avenida Victoria: Monterey Ln to Alameda Ln 7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
$YHUDJH'DLO\7UDIƄF
$'7
18,000
Lighting Yes
Highest Posted Speed Limit 35 MPH
Collision Data
7RWDO&ROOLVLRQV


9 Fatal and Injury
Collisions
Fatal Injury - 0
Severe Injury - 0
Visible Injury - 0
Top 3 Collision Types

SHUFHQWDJH

Sideswipe (33%)
Other (22%)
Head-On (11%)
Total Nighttime Collisions 1
Wet Surface Collisions 2

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
9--
N
6(*0(17
Olas
Vista
Collision Trends
Ave Del Mar
N
El Camino Real
Collision Trends:
0 1
2 3
2015 2016 2017 2018 2019
Number of Collsions
Years
Type of
Collision Total
Sideswipe 3
Other 2
Broadside 1
Hit-Object 1
Rear-End 1
Head-On 1
A-11
73 I I
Kimley >>> Horn
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
&UDVK0RGLƄFDWLRQ
Factor

/560&0),'

<HDU
6DIHW\%HQHƄW
Total
<HDU
Costs
Safety
Related
%&
All Install back-in angle parking
along Avenida Del Mar 0.95 $478,800 $50,000 9.58
All
Implement paid parking
(funding going to support
enhanced shuttle services)

0.95 $478,800 $75,000 6.38
All
Implement/enhance
parking shuttle services in
Downtown Area

0.95 $478,800 $100,000 4.79
Additional Comments
• Back up parking spots
• Parking meters
A-12 Kimley >>> Horn 74
Project Template: Location #7
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Project Location Description & Maps:

Segments: El Camino Real: W Escalones to Avienda Barcelona (Downtown San Clemente) Similar Segments: El Camino Real: Avenida Algodon to Avenida Valenica El Camino Rea: Avenida Pico to El Portal
7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
$YHUDJH'DLO\7UDIƄF
$'7
18000
Lighting Yes
Highest Posted Speed Limit 30 MPH
Collision Data
7RWDO&ROOLVLRQV


146
Fatal and Injury
Collisions
Fatal Injury - 0
Severe Injury - 2
Visible Injury - 17
Top 3 Collision Types

SHUFHQWDJH

Sideswipe (28%)
Broadside (25%)
Rear-end (19%)
Total Nighttime Collisions 58
Wet Surface Collisions 19

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
130 11 5
N
6(*0(17
Escalones
El Camino Real
N
Avenida
Barcelona
Collision Trends:
0 5
10 15
20 25
30 35
40 2015 2016 2017 2018 2019
Number of Collisions
Years
Collision Trends:

Type of Collision Total
Broadside 37
Sideswipe 41
Rear-End 29
Other 12
Vehicle-Pedestrain 10
Head-On 9
Hit-Object 7
Overturned 1
A-13
75 ~======-==-===-==-71
I I I
I I
Kimley >>> Horn
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
&UDVK0RGLƄFDWLRQ
Factor

/560&0),'

<HDU
6DIHW\%HQHƄW
Total
<HDU
Costs
Safety
Related
%&
All
Adjust roadway alignment
(one lane in each direction
with a two-way left-turn
lane)

0.70 (R14) $11,889,360 $12,500 951.15
All Install consistent signage

0.85 (R22) $5,944,680 $15,000 396.31
All
Implement ordinance to
prohibit parking when lane
width is narrow

0.95 $1,981,560 $12,000 165.13
All
Improve signal coordination
along El Camino Real
(Escalones to Ave
Barcelona)

0.85 (S03) $5,944,680 $46,000 129.23
All
Implement central parking
lots & parking shuttle in
Downtown area

0.95 $1,981,560 $300,000 6.61
Additional Notes:
• Two lanes in each direction with turning lanes for businesses,commerical, and residential • Signal coordination
A-14 Kimley >>> Horn 76
Project Name: San Clemente LRSP
Agency Name: San Clemente
Contact Name: Saeedeh Farivar
Email: [email protected]
Prepared by: Kimley-Horn
Checked by: Jason Melchor, PE
Date: November 2022
Case Study Sheet: Location #8
Project Location Description & Maps:

Intersection: El Camino Real + Esplande
Examples of Similar Intersections: El Camino Real & Avenida Cabrillo; El Camino Real & Avenida Miramar 7UDIƄFDQG*HRPHWULF'DWD

7UDIƄF'DWD
Number of Approaches 3
Total Entering Vehicles 9000
Crosswalk Condition None
Control Type unsignalized
Lighting Yes
Highest Posted Speed Limit 30MPH
Median None
Collision Data
Total Collisions(2015-2019) 12
Fatal and Injury
Collisions
Fatal Injury - 0
Severe Injury - 2
Visible Injury - 1
Top 3 Collision Types Broadside (66%)
Rear-end (8%)
Sideswipe (8%)
Total Nighttime Collisions 4
Wet Surface Collisions 0

INTERSECTION
Collision Breakdown
Veh vs. Veh Veh vs. Ped Veh vs. Bike
12 0 0
N N
Esplande
Collision Trends
Collision Trends:
0 1
2 3
4 5
6 7
2015 2016 2017 2018 2019 2020
Number of Collisions
Years
Type of Collision Total
Broadside 8
Hit Object 1
Rear-End 1
Sideswipe 1
Overturned 1 *
*Left-turn restriction was implemented in 2020
El Camino Real
A-15
77 I I I
Countermeasure Evaluation
Primary
Issues
Potential
Countermeasures
Crash
0RGLƄFDWLRQ
Factor (LRSM/

CMF ID)
20 Year
Safety
%HQHƄW
Total 20-Year
Costs
Safety Related
B/C
Broadsides Install median to restrict left
turns from Esplanade

0.50 (NS15) $9,448,000 $25,000 377.92
Additional Notes:
• Left turn restriction from Esplande onto El Camino Real: people are making left turn regardless of restriction A-16 Kimlev>>>Horn 78
SAN CLEMENTE LRSP 2022
Appendix B: Full Analysis Rankings Table –
Intersection and Segments
79 Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Signalized Intersections San Diego Fwy & Ave Pico 31 0.5 275 8 5 7 2 5 0 1 3 2 9 0 3 0 1 0 1 3 10 17 W Ave Palizada & N El Camino Real 22 0.1 57 7 4 5 1 2 0 2 1 2 2 0 6 0 1 0 0 1 5 16 San Diego Freeway & S El Camino Real 21 0.4 412 9 1 3 6 2 0 0 0 1 3 0 4 0 0 0 2 5 3 11 Puerta del Sol & Ave Pico 18 0.2 77 6 0 6 2 4 0 0 0 0 9 0 5 0 0 0 0 4 4 10 Ave la Pata & Ave Vista Hermosa 16 0.1 552 10 1 3 1 0 0 1 0 1 9 0 0 0 3 0 3 2 5 6 Ave Presidio & Ave Pico 16 -0.1 36 1 3 6 0 5 0 1 0 0 7 0 1 0 2 0 0 0 4 12 N el Camino Real & Ave del Mar 14 0.1 198 0 6 4 0 1 0 2 1 0 5 0 2 0 1 0 1 0 4 9 S el Camino Real & Ave Rosa 13 0.0 42 4 1 2 4 0 0 2 1 1 3 0 1 0 1 0 0 3 0 10 Ave Pico & Camino Vera Cruz 13 0.0 211 3 3 3 2 2 0 0 0 0 4 0 1 0 1 0 1 3 1 8 I-5 Freeway & Camino De Los Mares 12 -0.03 191 4 4 1 0 1 1 0 1 0 5 0 3 0 1 0 1 0 3 8 Coast Hwy & Ave Mendocino 11 0.13 387 5 3 1 0 2 0 0 0 0 1 0 2 0 2 0 2 5 0 4 Cll de Los Molinos & N el Camino Real 11 0.00 65 4 0 3 1 1 0 1 1 3 1 0 0 0 0 0 0 4 3 4 Ave Pico & Cll del Cerro 11 -0.09 200 4 1 3 0 2 1 0 0 0 6 0 2 0 0 0 1 1 3 6 Cam Vera Cruz & Ave Vista Hermosa 11 -0.02 195 2 0 6 1 2 0 0 0 0 5 0 2 0 2 1 0 1 2 7 San Diego Fwy & Ave Vista Hermosa 11 -0.08 185 4 1 2 0 2 1 0 1 0 4 0 1 0 0 0 1 0 2 8 N el Camino Real & Ave Cabrillo 10 0.00 29 3 3 4 0 0 0 0 0 0 1 0 3 0 0 0 0 2 0 8 Cam Capistrano & N el Camino Real 10 0.03 189 1 1 6 0 2 0 0 0 0 5 0 1 0 1 0 1 0 3 6 Ave Pico & San Clemente HS 10 -0.11 35 8 0 2 0 0 0 0 0 0 9 0 0 0 2 0 0 1 3 6 N Ola Vis & Ave del Mar 9 0.01 19 2 4 0 0 1 0 1 1 0 0 0 1 0 0 0 0 1 0 8 N Ave de la Estrella & E Ave Palizada 9 0.20 19 2 3 3 1 0 0 0 0 1 3 0 2 0 0 0 0 0 2 7 B-1
80 1
Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Dolphin Dr & N el Camino Real 9 0.03 29 0 1 3 0 3 0 2 0 1 3 0 2 0 2 0 0 1 2 6 Ave Pico & Cll Amanecer 9 -0.09 39 5 1 1 0 1 0 0 0 0 6 0 0 0 0 0 0 1 4 4 Cll Agua & Cam de Estrella 9 -0.09 38 2 0 2 1 4 0 0 0 1 2 0 1 0 1 0 0 3 0 6 Cam de Los Mares & Calle Nuevo 9 -0.08 53 2 1 1 0 3 0 0 0 0 2 0 1 0 0 0 0 3 3 3 S El Camino Real & E Ave San Juan 8 0.00 38 1 1 4 1 0 0 1 0 1 4 0 1 0 0 0 0 2 2 4 Ave la Pata & CII Saluda 8 0.38 18 1 1 2 0 4 0 0 0 1 1 0 3 0 0 0 0 0 2 6 Cam de Estrella & Cam de los Mares 8 -0.11 32 0 1 6 0 1 0 0 0 0 5 0 0 0 1 0 0 2 1 5 Ave Barcelona & Ave Cadiz 7 -0.08 22 1 1 0 1 2 0 1 1 1 2 0 2 0 0 0 0 1 1 5 Ave Estacion & N el Camino Real 7 -0.06 42 2 1 3 0 0 1 0 0 1 2 0 2 0 0 0 0 2 3 2 Ave Vista Hermosa & Calle Frontera 7 -0.15 22 2 1 2 1 1 0 0 0 0 2 0 0 1 1 0 0 0 3 4 Ave la Pata & Ave Pico 7 -0.10 191 2 0 2 1 1 0 0 1 0 2 0 1 0 0 0 1 0 4 2 Cam de Los Mares & Ave Vaquero 7 -0.11 355 0 0 2 1 2 1 1 0 1 3 0 2 0 1 0 2 0 4 1 S El Camino Real & Coast Hwy 6 -0.12 40 2 0 3 1 0 0 0 0 0 2 0 3 0 0 0 0 3 1 2 S el Camino Real & Ave Victoria 6 -0.13 35 0 1 1 0 1 0 0 3 0 1 0 2 0 0 0 0 3 0 3 W Mariposa & N el Camino Real 6 -0.14 30 1 3 1 0 0 0 0 1 0 0 0 3 0 0 0 0 2 1 3 Ave Pico & Cll Deshecha 6 -0.04 25 0 0 2 0 4 0 0 0 0 1 0 2 0 2 0 0 2 0 4 Ave Pico & N el Camino Real 6 -0.14 6 2 3 1 0 0 0 0 0 0 1 0 2 1 0 0 0 0 0 6 Ave Talega & Ave Vista Hermosa 6 -0.07 21 3 0 1 2 0 0 0 0 0 4 0 0 0 0 0 0 0 3 3 Cam de los Mares & Ocean View Pl 6 -0.13 36 1 1 0 3 0 1 0 0 0 3 0 0 0 0 0 0 1 4 1 S el Camino Real & San Diego Fwy Ovp 5 -0.13 35 1 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 1 4 0 Ave del Presidente & Ave Califia 5 0.12 24 1 2 0 1 1 0 0 0 1 1 0 1 0 1 0 0 2 0 3 Cll de Los Molinos & Ave Pico 5 -0.15 25 3 0 2 0 0 0 0 0 1 3 0 0 0 0 0 0 0 4 1 B-2
81 Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Ave Pico & San Clemente HS (S) 5 -0.17 15 0 3 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 2 3 Plaza Pacific & Ave Pico 5 -0.14 20 3 0 2 0 0 0 0 0 0 3 0 0 0 0 0 0 1 1 3 Ave Presidio & Ave Victoria 4 0.72 177 3 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 1 0 2 Ave del Poniente & N el Camino Real 4 -0.18 28 1 0 0 0 2 0 1 0 1 1 1 1 0 0 0 0 2 1 1 CII Negocio & Cll Amanecer 4 0.46 9 2 0 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0 1 3 Cam de Estrella & Cam Mira Costa 4 -0.17 177 1 0 0 0 1 0 1 1 1 0 0 1 0 1 0 1 1 0 2 Ave Vista Hermosa & Cam la Padriza 4 -0.12 14 1 0 1 0 1 0 1 0 1 4 0 0 0 1 0 0 1 0 3 Coast Hwy & E Ave San Gabriel 3 -0.19 176 1 0 1 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 1 Cll de Industrias & Ave Pico 3 -0.20 13 0 1 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 2 1 Ave Vista Montana & Cll del Cerro 3 -0.01 8 0 0 2 0 1 0 0 0 0 1 0 0 0 1 0 0 0 1 2 Ave Vista Hermosa & Cam Laurel 3 -0.20 3 0 0 2 1 0 0 0 0 0 3 0 1 0 0 0 0 0 0 3 Cam Vera Cruz & Plaza Pacifica 3 0.18 3 1 0 0 2 0 0 0 0 0 2 0 0 0 0 0 0 0 0 3 CII Allcante & Ave Pico 3 -0.19 18 1 0 1 0 1 0 0 0 0 1 0 1 0 0 0 0 1 1 1 Cll Sarmentoso & Cam Vera Cruz 3 0.36 13 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 2 Ave Pico & I-5 S 3 -0.20 8 1 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 2 Ave Pico & Gateway Village 3 -0.20 13 0 0 0 0 2 0 1 0 1 2 0 0 0 0 0 0 1 0 2 Cam de Estrella & Ave de la Palmas 3 -0.20 3 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Cam de Estrella & Calle Naranja 3 -0.20 3 0 0 2 0 1 0 0 0 0 1 0 2 0 0 0 0 0 0 3 Cam de los Mares & San Clemente Professional Plaza 3 -0.20 8 0 0 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 1 2 Unsignalized Intersections W Canada & N El Camino Real 19 0.4 79 7 2 5 0 0 0 2 3 2 3 0 2 0 1 0 0 2 8 9 S El Camino Real & Ave Granada 18 0.3 196 3 6 6 0 0 0 1 2 1 6 0 3 0 0 0 1 1 1 15 B-3
82 Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
S El Camino Real & W Esplande 12 0.1 364 8 1 1 0 1 1 0 0 0 0 0 2 0 0 0 2 1 3 6 Ave Barcelona & S Ola Vista 9 0.4 226 0 4 0 1 1 0 2 1 2 1 0 1 0 0 0 1 5 1 2 W Ave Palizada & Loma Ln 9 0.7 9 0 4 3 1 1 0 0 0 0 1 0 3 1 0 0 0 0 0 9 Boca de la Playa & N El Camino Real 9 0.2 178 0 8 0 0 0 0 0 1 0 0 0 3 0 1 0 1 0 1 7 S El Camino Real & Trafalgar Ln 8 0.1 38 2 2 0 1 1 1 1 0 0 1 0 3 0 0 0 0 2 2 4 N El Camino Real & Ave Serra 8 0.1 13 2 3 2 0 0 0 1 0 0 2 0 0 0 2 0 0 0 1 7 E Marquita & N El Camino Real 7 0.0 27 2 2 2 0 0 0 1 0 0 1 0 2 0 1 0 0 1 2 4 W Escalones & N El Camino Real 7 0.1 7 3 4 0 0 0 0 0 0 0 0 0 2 0 1 0 0 0 0 7 N el Camino Real & Avenida Aragon 7 0.0 12 0 0 0 1 6 0 3 2 1 1 0 0 0 0 2 0 1 0 0 N Ave de la Estrella & Calle Redondel 7 2.05 22 0 0 1 1 5 2 1 1 0 3 0 0 0 1 1 0 3 0 0 Cll Extremo & Ave la Pata 7 0.58 7 0 0 0 0 7 0 1 2 0 4 0 0 0 0 2 0 2 1 1 Cam de Los Mares & Bonanza 7 0.25 37 0 0 2 2 3 2 0 0 0 4 1 0 0 0 1 0 2 0 1 W Ave Palizada & N Cll Seville 6 0.23 11 0 0 0 1 5 1 3 1 0 1 0 0 0 0 1 0 3 2 0 Cll del Comercio & E Ave Magdalena 5 0.03 29 0 0 2 1 2 2 2 0 0 0 0 1 0 0 0 0 0 0 0 Vis Marina & W Pso de Cristobal 5 1.32 10 0 0 0 1 4 0 2 2 0 1 0 0 1 0 0 0 0 0 0 Ave del Mar & Acebo Ln 5 0.00 5 0 0 0 0 5 0 5 0 0 0 0 0 0 0 0 0 0 0 0 Ave Victoria & Ave Monterey 5 0.01 5 0 0 0 0 5 0 3 0 0 0 0 2 0 0 0 0 2 0 0 S el Camino Real & Ave Cadiz 5 -0.01 10 0 0 0 1 4 3 0 1 1 0 0 0 0 0 1 0 0 1 0 S Cll Seville & Ave Granada 5 0.25 10 0 0 0 1 4 1 2 1 0 0 0 1 0 1 0 0 2 0 0 Ave Caballeros & E Ave Palizada 5 0.29 10 0 0 0 1 4 2 1 0 1 0 0 1 0 1 2 0 0 0 0 Cll Las Bolas & N el Camino Real 5 0.00 20 0 0 1 1 3 0 1 1 1 1 0 0 0 0 0 0 1 0 1 S el Camino Real & Ave San Diego 4 -0.01 168 0 1 0 0 3 1 1 2 0 0 0 0 0 0 0 0 0 0 0 B-4
83 Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Coast Hwy & W Ave San Gabriel 4 -0.01 187 0 1 2 0 1 0 1 1 0 0 0 0 2 0 0 0 0 0 0 W Ave Cornelio & El Camino Real 4 -0.02 14 0 0 1 0 3 3 0 0 0 1 0 0 0 0 0 0 0 0 0 S Ola Vis & W Ave Gaviota 4 0.05 14 0 0 0 2 2 0 0 0 0 3 0 1 0 1 0 0 3 1 0 W Ave Valencia & Ave del Presidente 4 0.18 4 0 0 0 0 4 2 1 1 0 0 0 0 0 0 0 0 2 0 0 Ave Victoria & S Cll Seville 4 -0.07 23 0 0 2 0 2 0 2 0 0 0 0 2 0 2 0 0 2 1 0 S Cll Seville & Ave del Mar 4 0.00 4 0 0 0 0 4 0 2 1 0 1 0 0 0 0 1 0 1 0 0 Ave Victoria & S Ola Vis 4 -0.02 14 0 0 1 0 3 1 1 1 1 0 0 0 0 0 0 0 1 0 0 W Mariposa & Cll Puente 4 0.15 14 0 0 1 0 3 0 1 3 0 0 0 0 0 0 1 0 0 0 1 Ave de la Estrella & Cll Cabrillo 4 0.96 14 0 0 1 0 3 0 1 1 0 1 1 0 0 0 1 0 0 0 0 N Ola Vis & W Ave Palizada 4 0.02 4 0 0 0 0 4 1 2 1 0 0 0 0 0 0 0 0 3 0 0 Ave de la Grulla & CII Mirador 4 0.01 4 0 0 0 0 4 1 0 0 0 2 0 1 0 0 2 0 0 0 0 Ave del Reposo & Cll Mirador 4 0.96 14 0 0 1 0 3 0 2 0 0 2 0 0 0 0 0 0 1 0 0 Ave de la Grulla & N el Camino Real 4 -0.05 177 0 1 1 0 2 1 1 1 0 0 0 0 1 0 1 0 0 0 0 CII del Carro & Montilla 4 0.58 14 0 0 0 2 2 0 0 0 1 3 0 0 0 0 1 0 0 0 0 Cll Frontera & Cll Juarez 4 0.08 14 0 0 0 2 2 2 1 0 0 1 0 0 0 0 0 0 1 0 0 Ave Vaquero & Calle Valle 4 0.07 168 1 0 0 0 3 0 0 0 0 4 0 0 0 0 1 0 2 0 0 Cll Campana & Cam de Los Mares 4 -0.05 14 0 0 1 0 3 2 0 0 0 2 0 0 0 0 0 0 1 0 1 S el Camino Real & San Diego Fwy Ovp 3 -0.05 3 0 0 0 0 3 0 2 1 0 0 0 0 0 0 0 0 1 0 0 Coast Hwy & Ave San Pablo 3 -0.05 8 0 0 0 1 2 0 0 0 1 1 0 1 0 0 0 0 1 0 0 Coast Hwy & W Ave Junipero 3 -0.07 13 0 0 0 2 1 1 0 2 0 0 0 0 0 0 2 0 0 0 0 E Ave San Antonio & S El Camino Real 3 -0.05 32 0 0 3 0 0 1 0 0 0 1 0 0 1 0 1 0 0 0 0 E Ave Ramona & W Ave Ramona 3 -0.05 167 1 0 0 0 2 1 1 0 0 0 0 1 0 0 0 0 2 0 1 B-5
84 Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
E Ave San Juan & Cll Alcazar 3 0.59 3 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 0 1 0 0 S El Cam Real & Coast Hwy 3 -0.07 13 0 0 0 2 1 1 0 2 0 0 0 0 0 0 1 0 0 0 0 W Esplande & S Ola Vis 3 -0.05 13 0 0 1 0 2 1 0 1 0 1 0 0 0 0 1 0 1 0 0 Coast Hwy & W Ave Cordoba 3 -0.06 8 0 0 0 1 2 0 1 1 0 0 0 1 0 0 2 0 0 0 0 Coast Hwy & W Pso de Cristobal 3 -0.06 13 0 0 1 0 2 2 0 0 0 0 0 0 1 0 0 0 0 0 0 Ave del Mar & Capistrano Ln 3 -0.05 3 0 0 0 0 3 0 1 0 1 0 0 1 0 0 0 0 1 0 0 S Ola Vis & Ave Monterey 3 -0.02 176 0 1 1 0 1 0 0 0 0 1 1 0 1 0 0 0 2 0 0 N Cll Seville & Ave Cabrillo 3 0.05 3 0 0 0 0 3 0 2 0 0 0 0 1 0 0 0 0 0 0 0 W Ave Palizada & Ave Serra 3 0.07 3 0 0 0 0 3 0 1 2 0 0 0 0 0 0 0 0 1 0 0 N Ola Vis & Ave Cabrillo 3 -0.02 3 0 0 0 0 3 0 2 1 0 0 0 0 0 0 1 0 1 0 0 Ave Presidio & La Esperanza 3 0.07 3 0 0 0 0 3 0 2 0 0 1 0 0 0 0 1 0 1 0 0 Ave del Poniente & Cll Puente 3 0.05 3 0 0 0 0 3 0 2 1 0 0 0 0 0 0 0 0 1 0 1 Ave Presidio & La Esperanza 3 -0.01 18 0 0 1 1 1 0 0 3 0 0 0 0 0 0 1 0 0 0 1 W Canada & N Ell Cam Real 3 0.40 3 0 0 0 0 3 0 2 1 0 0 0 0 0 0 1 0 0 1 0 N el Camino Real & Calle Valle 3 -0.06 13 0 0 1 0 2 0 2 0 0 0 0 1 0 1 0 0 0 0 0 Ave Presidio & Avenida Salvador 3 -0.04 8 0 0 0 1 2 0 1 1 0 0 0 1 0 0 0 0 2 0 1 Ave Pico & Ave Navarro 3 -0.07 13 0 0 1 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 1 Ave Presidio & Gateway Village 3 -0.08 18 0 0 1 1 1 1 0 0 1 1 0 0 0 0 1 0 0 0 0 Via Breve & Cam Capistrano 3 0.05 3 0 0 0 0 3 0 1 2 0 0 0 0 0 0 1 0 1 0 0 Cll del Cerro & Ave la Pata 3 -0.02 181 0 1 1 1 0 1 0 0 0 1 0 1 0 1 0 0 1 0 0 Cll Trepadora & Cll Amanecer 3 0.40 167 0 1 0 0 2 1 1 0 0 1 0 0 0 0 0 0 1 0 0 Cll Campana & Cll Canasta 3 0.40 3 0 0 0 0 3 0 1 1 0 1 0 0 0 0 1 0 1 0 0 Cam la Pedriza & Cristianitos Rd 3 0.28 3 0 0 0 0 3 2 1 0 0 0 0 0 0 0 0 0 0 0 0 B-6
85 Intersection
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Via Blanco & Cam Vera Cruz 3 0.40 8 0 0 0 1 2 0 1 2 0 0 0 0 0 0 2 0 0 0 0 Carretera & Cam Vera Cruz 3 0.59 13 0 0 0 2 1 1 0 2 0 0 0 0 0 0 2 0 0 0 0 1. Local Critical Crash Rate Differential 2. Equivalent Property Damage Only Crashes Local CCR Differential is Greater than Zero Fatal & Severe Injuries are greater than zero 50-75% probability that crash type is over-represented 75+% probability that crash type is over-represented B-7
86 Facility Limits
Crashes
Local CCR Differential
1 EPDO
2 Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Distracted
Impaired
Dark
Wet
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
PDO
Other Principal Arterial S el Camino Real E Ave Magdalena - I-5 Fwy Ramp 6 0.6 190 0 3 1 0 0 0 1 1 0 1 0 1 1 0 0 1 1 2 2Minor ArterialAve del Mar N el Camino Real - N Ola Vista 9 2.8 9 0 3 1 1 2 0 2 0 0 1 0 0 0 2 0 0 0 0 9Ave Pico I-5 Ramp - San Clemente High School 9 0.7 29 3 5 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 2 6Ave Pico Calle del Cerro - Calle Amanecer 4 - 0.08 34 0 0 3 0 0 0 1 0 1 3 0 0 0 0 0 0 2 2 0Ave Santa Barbara Ave Rosa - S Ola Vista 3 0.5 3 1 2 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 3Ave Vaquero Calle Vista Torito - Calle Arco 3 0.6 13 0 0 2 0 1 0 0 0 0 1 0 2 0 1 0 0 1 0 2Major CollectorCll del Cerro Ave Pico - Ave Vista Montana 6 1.2 190 0 1 1 0 4 0 0 0 0 2 0 1 0 1 1 0 1 2 2Trafalgar Ln Trafalgar Ln - S Ola Vista 2 0.2 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2LocalW Marquita N el Camino Real - Calle Puente 4 6.21 4 0 1 0 1 0 0 2 0 0 0 0 2 0 0 0 0 0 0 4W Escalones N el Camino Real - Calle Puente 4 6.51 4 0 0 3 0 1 0 0 0 0 3 0 0 1 0 0 0 0 0 41. Local Critical Crash Rate Differential 2. Equivalent Property Damage Only Crashes Local CCR Differential is Greater than Zero Fatal & Severe Injuries are greater than zero 50-75% probability that crash type is over-represented 75+% probability that crash type is over-represented B-8
87 Attachment 2
RESOLUTION NO. 23-45

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE APPROVING THE LOCAL ROADWAY

SAFETY PLAN (LSRP)
WHEREAS, Federal regulations require that each State has a Strategic Highway Safety Plan (SHSP) and while the SHSP is used as a statewide approach for improving roadway safety, a Local Roadway Safety Plan (LRSP) is a means for providing local and rural road owners with an opportunity to address unique highway safety needs in their jurisdictions while contributing to the success of the SHSP; and
WHEREAS, starting in 2022, the Highway Safety Improvement Program (HSIP) Calls for Projects, will require that an agency have an approved LRSP to be eligible to apply for federal HSIP funds; and
WHEREAS, on February 18, 2020, City Council authorized staff to submit a grant application to Caltrans for the LRSP development; and
WHEREAS, the Scope of Work of the project included preparation of the City’s LRSP through acquiring and analyzing traffic and collision data, identifying partners to review the data, selecting emphasis areas, developing safety strategies and countermeasures, and adopting the final plan; and
WHEREAS, the LRSP will play a critical role in addressing traffic collision risks and may identify specific or unique conditions that contribute to traffic collisions within the City and will provide a blueprint for future projects with costs associated with each project; and WHEREAS, the City previously determined that the preparation of an LRSP is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines Section 15301 (Class1: Existing Facilities) and Section 15306 (Class 6:

Information Gathering); and
WHEREAS, on April 6, 2021, City Council approved the Professional Services Agreement (PSA) with Kimley-Horn and Associates to prepare the LRSP; and WHEREAS, stakeholder meetings and field tours were held with representatives from various City Departments, Capistrano Unified School District, Orange County Sheriff’s Department, Orange County Fire Authority, San Clemente’s Public Safety Committee, and local pedestrian and bicycle activist to present the purpose of the LRSP, the results of the citywide crash pattern and trend analysis for crash severity and roadway user type (pedestrian and bicycle crashes), and priority locations identified from the citywide crash analysis; and 88 Resolution No. 23-45 Page 2
WHEREAS, stakeholder feedback packets were distributed to meeting attendees and guidance was provided for the feedback sought regarding priority locations, areas with known safety issues / high-risk behaviors including near schools, and desired roadway infrastructure improvements and safety programs and stakeholder packet responses were collected and addressed in the LRSP; and
WHEREAS, the approval of the LRSP would enable City staff to submit grant applications, with the goal of receiving funds to implement the LRSP identified priority projects.

NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council of the City of San Clemente, State of California, as follows:

SECTION 1: Incorporation of Recitals.

The City Council hereby finds that all of the facts in the Recitals above are true and correct and are incorporated and adopted as fully set forth in this resolution.

SECTION 2: The San Clemente City Council hereby approves and accepts the Local Roadway Safety Plan (LRSP) prepared by Kimley-Horn and Associates dated December 2022.

SECTION 3: The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this ____ day of June, 2023.

ATTEST:
_______________________________ _____________________________ City Clerk of the City of San Clemente, Mayor of the City of San Clemente, California California
89 Resolution No. 23-45 Page 3

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-45 was adopted at a regular meeting of the City Council of the City of San Clemente held on ______ day of June 2023, by the following vote:

AYES:

NOES:

ABSENT:
____________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
90 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 10B
Department: Public Works
Prepared By Zak Ponsen, Assistant City Engineer
Ryan Kim, Senior Civil Engineer - Traffic
Subject:

ADOPTION OF A RESOLUTION FOR TRAFFIC CALMING ON AVENIDA PRESIDIO BETWEEN

CALLE CORTEZ AND NORTH LA ESPERANZA, AND FINDING THE PROJECT

CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) UNDER CLASS 1 (EXISTING FACILITIES, 14 CCR SECTION 15301) OF THE STATE CEQA

GUIDELINES
Fiscal Impact:

Yes. The estimated cost for the proposed traffic calming improvements is approximately $15,000.

There is a sufficient remaining balance from the Traffic Calming Project account to fund the work.

Summary:

Before the City Council is approval of the following traffic calming improvements:

1. One electronic speed feedback sign on the southbound Avenida Presidio before 105 Avenida Presidio;

2. Red curb installation and removal; and

3. Edge line striping on Avenida Presidio between Calle Cortez and North La Esperanza.

Background:

Since approximately 2015, staff has received occasional complaints of speeding vehicles on Avenida Presidio between Calle Cortez and North La Esperanza. Complaints were also received about difficulties with seniors crossing the street in this area. The majority of the complaints have been submitted by residents of the senior housing development located at 105 Avenida Presidio (“The Presidio”). Staff informed the complainants of the policies and procedures of the City’s Traffic Calming and Resource Manual (the “Manual”), and how to file a formal petition.

In 2018, a petition was submitted and a study was done to measure speeding in the area. The results at that time did not meet the criteria for traffic calming or a pedestrian crossing based on the traffic volume, speed, and collision history.

In 2022, the same resident who filed the 2018 petition requested that new signage be installed to warn drivers of pedestrians crossing the road. City staff installed pedestrian crossing signs and agreed that edge line striping would be added during the next paving project on the street.

Additionally, staff periodically staged the speed feedback trailer and requested additional police monitoring of the area.

In response to a resident's request in August 2022, staff installed a Crossing Pedestrian warning sign CITY OF SAN CLEMENTE Page 1 of 3 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 10B
In response to a resident's request in August 2022, staff installed a Crossing Pedestrian warning sign on each approach to The Presidio, based on the pedestrian safety assessment in December 2022.

Additional complaints have been submitted to the City recently and, as part of the effort to improve pedestrian safety, staff performed another traffic calming analysis for Avenida Presidio near the senior apartment in April 2023. The analysis included the Average Daily Traffic (ADT), speed surveys, and collision records.

As shown in Attachment 1, Avenida Presidio is a collector street. It has a 40-foot curb-to-curb width, a 25 mph speed limit, and on-street parking on both sides near the senior apartment complex.

Discussion:

In April 2023, staff collected travel speeds using radar and roadway counting machines. The measured Average Daily Traffic (ADT) was up to 1,446 vehicles on Avenida Presidio between Calle Cortez and North La Esperanza. The 85th percentile speed on Avenida Presidio is 30 mph.

Attachment 2 provides the traffic survey results.

Collision History
Recorded collision reports were received from the Orange County Sheriff's Department and the Statewide Integrated Traffic Records System (SWITRS) crash data. The three-year history from 2020 to 2022 shows two (2) incidents near the apartment complex on Avenida Presidio.

Traffic Calming Eligibility
The traffic calming analysis shows that the Avenida Presidio section qualifies for traffic calming measures. The analysis evaluated six (6) factors: Speed Element (10 points), Average Daily Traffic (ADT) Volume (0 point), Crashes (2 points), Pedestrian Generators (20 points), Sidewalks or Pathways (10 points), and Discretionary Factors (10 points). The Discretionary Factors received 10 points from the City Manager based on the additional data received from residents, the percentage of support, and other factors per the Manual. The main goal is to protect elderly pedestrians, who may have impairments and slower crossing speed. Out of a possible 110 points, the street section scored 52 points, which is above the 51 minimum points required to qualify for the traffic calming program. (See Attachment 3.) Therefore, the roadway is eligible for traffic calming measures.

The proposed traffic calming measures were reviewed by Planning Commission on May 17, 2023 and recommended for approval.

City notice was forwarded to the senior apartment representative to distribute to all residents in the community and the Presidio Point Condominiums to inform them that the City Council would discuss the subject matter at this meeting.

Council Options:
· Adopt Resolution No. 23-46, approving the traffic calming and red curbing modification as shown on Attachment 4 and finding the project categorically exempt from CEQA. · Adopt Resolution No. 23-46 with modifications.
· Continue the item and direct staff to provide additional information. · Do not adopt Resolution No. 23-46 and deny the request for traffic calming and/or red curbing CITY OF SAN CLEMENTE Page 2 of 3 Printed on 6/1/2023
powered by Legistar™ 2
Meeting Date: 6/6/2023 Agenda Item: 10B
· Do not adopt Resolution No. 23-46 and deny the request for traffic calming and/or red curbing modifications.

Environmental Review/Analysis:

The Planning Commission and staff recommend that the City Council determine this action to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines.

Recommended Actions:

Planning Commission and Staff recommend that the City Council approve Resolution No. 23-46 taking the following actions:

1. Finding the project categorically exempt from CEQA under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines;

2. Approving installation of electronic speed feedback signs, red curb installation and removal, and edge lines as illustrated in Attachment 4;

3. Appropriating the required funds (approximately $15,000) from the Traffic Calming Project, CIP No. 39807; and

4. Requesting Police Services to consider increasing speed enforcement near the apartment complex at 105 Avenida Presidio.

Attachment:

1. Location Map

2. Speed and Volume Map

3. Traffic Calming Eligibility Worksheet

4. Proposed Traffic Calming Measures

5. Resolution 23-46
Notification:

1. 105 Avenida Presidio via hand delivered notices

2. 120-150 Avenida Presidio via hand delivered notices
CITY OF SAN CLEMENTE Page 3 of 3 Printed on 6/1/2023
powered by Legistar™ 3
A

AVE PRESIDIO

VISTA ENCANTA

VISTA DEL PONTO
N. LA ESPERANZA

VISTA CAY

AVE BUENA

AVE ARLENA

LA ESPERANZA

AVE PRESIDIO

VIA ROBINA

CL PATR

AVE ARLENA
VISTA

VALINDA

CL ESMARCA

CL ALTA VISTA A
LCEDO
PATERO

AVE PIZARRO

LA CUESTA
EL

LEVANTE
RANADA

AVE VICTORIA

AVE MATE

AVE ROSA O

AVE ALGODON

AVE PRESIDIO

CL SONORA
CL
B
ELLA

CL DE SOTO

CL DE ANZA

CL BALBOA

CL SONORA

CL CORTEZ

EL LEVANTE

AVE SAN CARLOS CL SEGURO

CL NINA

AVE TERESA

LA ESPERANZA
SUERTE

EL CAMINO REAL
AVE

CL RICA CL DORADO

TERRAZA VISTA BAHIA

VE DE LA ESTRELLA
I-5 SAN DIEGO FWY

EL CAMINO REAL
N. LA ESPERANZA
I-5 SAN

DIEGO FWY

C I T Y O F S A N C L E M E N T E
910 Calle Negocio
San Clemente, CA 92673
https://www.san-clemente.org
LOCATION MAP g:\graphics_cd\autocad engr drawings\traffic\location maps.dwg 5.4.2023

SUBJECT LOCATION

PROPOSED TRAFFIC CALMING MEASURES

ON CALLE PRESIDIO
ATTACHMENT 1
4 FROM CALLE CORTEZ TO NORTH LA ESPERANZA
UNK
UNK
134
UNK
209
203
106
110
108
114
115
111
112
104
107
202
116
1 8
117
200
201
207
205
204
202
20 302
30 304
306100
105
227
225
228 237
235
231
229 232
238
233
170
105
120
UNK
240
239
241
170

C I T Y O F S A N C L E M E N T E
910 Calle Negocio
San Clemente, CA 92673
https://www.san-clemente.org
SPEED & VOLUME MAP g:\graphics_cd\autocad engr drawings\traffic\location maps.dwg 5.4.2023

CALLE PRESIDIO
ATTACHMENT 2
85th Percentile Speed = 30 mph
Daily Traffic Volume = 1,446 veh/day
Survey date: 4/19/2023 - 4/27/2023

AVE PRESIDIO

CL BALBOA

CL CORTEZ
N. LA ESPERANZA S. LA ESPERANZA

OUR LADY OF

FATIMA CHURCH

CASA DE SENIORS

PRESIDIO POINT

CONDOMINIUMS

OLD CITY HALL
(VACANT)
85th Percentile Speed = 30 mph
Daily Traffic Volume = 1,428 veh/day
Survey date: 4/19/2023 - 4/27/2023
5 FROM CALLE CORTEZ TO NORTH LA ESPERANZA

C I T Y O F S A N C L E M E N T E
910 Calle Negocio
San Clemente, CA 92673
https://www.san-clemente.org

TRAFFIC CALMING
ELIGIBILITY WORKSHEET g:\graphics_cd\autocad engr drawings\traffic\location maps.dwg 5.8.2023 ATTACHMENT 3
6 Project Location: Avenida Presidio
from 170 Ad'd'res.s to Esperanza
Date .of' Traffic Survey: 4/19/23 - 4/27/23
Survey Location: 170 Ave Presidio & East side .of Senior Casa Survey by: Traffic tubes and radar
Street ·Classific.atim1: Residential Collector
P,ost,ed Speed Umit: 25 MPH
Data Element Assigned Survey/Data Calculated Points
Points
Speed - Extent that 85th. peroentile speeds exceed
speed limit; 2 points assigned for every 1 mph over
speed limit Oto 30 30 10
ADTVolume- 1 poi.nt for every 25 vehicles over
500 ADT fo r local residential streets or 1 point for
every 100 vehicles over 1500 ADT for coll.ector
residential· streets. Oto 25 t,446 0
Cra.s.hes - 1. point tor every nonfatal crash and 5
points for every fatar crash recorded by t he Sherrff s Department in the 1:ast 3 years
(OC Sheriff & Tl M records 2018 to 2022} Oto 15 2 2
Public Facility/ City
P,edestrian Generators. - 5 po ints for every school, Hall; Church; park, community center, library, or other public School ; Senior facility within the impact area Oto 20 Genter 2.0
Sidewalks, or pathways - 5 points if there are not
continuous sidewalks or pathw ays on one side of al,[
local! residential streets or both srdes of au No continuous collecto rs; 10 points if there are no sidewalks 0 to 10 sidewalk 10 Discretionary Factors, - Up to 10 points may be
awarded by the City Manager for additional data Senior Apartment provided by residents, percentage of residents in includesdlsabl.ed support, and ot!ler factors. Oto 10 residents, etc. to
!Total Points II - lj 52
I *Qualified for Traffic Calming Program~ YES
* Note: A minimum total score of 51 po.in ts is required for the residential neighborhood to qualify for traffic calming treatments .. ff it is not eligible or it is determined that there are no tools available to address the problem; no furl.her adion wilf .be ·taken
-
i1 ~ .• fr\
IO 2 )
~ C - ~l1FoR~'~ I
100
105
105
120
9'11' 11'

AVE PRESIDIO

CASA DE SENIORS
105 AVE PRESIDIO

PRESIDIO POINT

CONDOMINIUMS

OLD CITY HALL
(VACANT)
Driveway Driveway
Driveway
Driveway
Drivew
Driveway Driveway
Driveway
Existing
10' 10'
35'
60'
30'
45'
21'
50'
20' 20'
50'
45' 48'
76'
N. LA ESPERANZA
11' 11' 9'
9'
9'
203
202
118
117
200
201
205
206
208
204
202
200
3 170
170
CL CORTEZ Existing
eway

AVE PRESIDIO
Existing
Existing
11' 11' 9' 9'

C I T Y O F S A N C L E M E N T E
910 Calle Negocio
San Clemente, CA 92673
https://www.san-clemente.org
g:\graphics_cd\autocad engr drawings\traffic\location maps.dwg 5.8.2023 ATTACHMENT 4

PROPOSED TRAFFIC CALMING MEASURES
ON

AVENIDA PRESIDIO

MATCH LINE SEE BELOW

MATCH LINE SEE ABOVE
Typical Vehicle Speed
Feedback Sign
LEGEND:
- PROPOSED RED CURB / NO-PARKING ZONE- EXISTING RED CURB / NO-PARKING ZONE;

PROPOSED TO BE REMOVED
- PROPOSED WHITE EDGELINES 9' FROM CURB- PROPOSED 32"X42" ELECTRONIC VEHICLE SPEED

FEEDBACK SIGNS ON EXISTING STREET LIGHT POLE
- EXISTING RED CURB / NO-PARKING ZONE
7 ~
.\
I
I
I
7 I
I
Ii
/<8>
/ / ' .,
\
\
\
\
\
\
\
...
01-lft -11,
"'::1:N
a. - I/) ...J
ATTACHMENT 5
4894-8400-9831 v1
RESOLUTION NO. 23-46

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, AMENDING MASTER
TRAFFIC RESOLUTION NO. 1846, ESTABLISHING ‘NO
PARKING AREAS’ ON AVENIDA PRESIDIO, AND FINDING

THE PROJECT CATEGORICALLY EXEMPT FROM THE

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
UNDER CLASS 1 (EXISTING FACILITIES, 14 CCR SECTION
15301) OF THE STATE CEQA GUIDELINES
WHEREAS, the City has received complaints related to Avenida Presidio between Calle Cortez and North La Esperanza; and
WHEREAS, the City has studied the speeds in the area, conducted a pedestrian safety assessment, conducted a traffic calming analysis and reviewed the parking conditions on Avenida Presidio between Calle Cortez and North La Esperanza; and WHEREAS, the traffic calming analysis shows that the Avenida Presidio section qualifies for traffic calming measures and the City desires to improve safety and traffic conditions in the area; and
WHEREAS, the City of San Clemente Planning Commission (“Planning Commission”), at its regular meeting of May 17, 2023, made a recommendation to the City of San Clemente City Council (“City Council”) to approve the parking prohibitions at the locations listed below; and
WHEREAS, the City Council has considered the recommendation by the Planning Commission, the information provided by City staff and any information provided by the public at or before the June 6, 2023 City Council meeting, and City Council now wishes to implement the recommended parking prohibitions.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:

Section 1. That the above recitals are true and correct.

Section 2. That the project is categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines because it consists of minor alteration of existing public structures, facilities or topographical features, involving negligible or no expansion of existing or former use and there is no possibility of a direct or foreseeably indirect effect on the environment.

Section 2. That the Master Traffic Resolution No. 1846, Section 23, entitled “No Parking Areas”, is hereby amended by modifying subsection 23.p-55a to read as follows:

23.p-55a Presidio, Avenida, south side, from a point 20 feet west of the 8 Resolution No. 23-46 Page 2
4894-8400-9831 v1
driveway at 100 Avenida Presidio in the westerly direction of 50 feet.

Section 3. That the Master Traffic Resolution No. 1846, Section 23, entitled “No Parking Areas”, is hereby amended by adding the following subsections:

23.p-55d Presidio, Avenida, north side, at 105 Avenida Presidio, west (egress) driveway, 10 feet on both sides of the driveway.

23.p-55e Presidio, Avenida, north side, at 105 Avenida Presidio, east (main entrance) driveway, 60 feet east of the driveway.

Section 4. That staff is authorized and directed to install electronic speed feedback signs, red curb installation and removal, and edge lines as illustrated in Attachment 1.

Section 5. That funds required for this project in the amount of approximately $15,000 shall be appropriated from the Traffic Calming Project, CIP No. 39807.

Section 6. That staff is authorized and directed to request Police Services to consider increasing speed enforcement near the apartment complex at 105 Avenida Presidio.

Section 7. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of June, 2023.

ATTEST:
___________________________ __________________________
City Clerk of the City of Mayor of the City of
San Clemente, California San Clemente, California
9 Resolution No. 23-46 Page 3
4894-8400-9831 v1

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, Laura Campagnolo, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 23-46 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of June, 2023, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
_________________________
Elizabeth A. Mitchell, City Attorney
10 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 10C
Department: City Manager
Prepared By Andy Hall, City Manager
Subject:

TEMPORARY MODIFICATION OF BEACH HOURS IN ACCORDANCE WITH SECTION 12.32.140

OF THE SAN CLEMENTE MUNICIPAL CODE AND CONSIDERATION OF URGENCY

ORDINANCE RELATED TO SAME
Summary:

Section 12.32.140 of the San Clemente Municipal Code allows the City Manager to modify the beach closure hours when special circumstances warrant. There has been a measurable increase in municipal code violations in the beach areas and enforcement of the laws and ordinances of the City become challenging after 10:00 p.m. Although this is a temporary action, staff will be monitoring the beach environment to determine if the early closure improves public safety at the beach. If so, a permanent modification of the beach closure hours will be presented to the City Council for consideration.

Background:

In accordance with Section 12.32.140 of the San Clemente Municipal Code (SCMC) the use of the public beaches is not allowed between the hours of 12:00 a.m. (midnight) and 4:00 a.m. However, the SCMC indicates that in the event of special circumstances the City Manager is authorized and empowered to modify the hours by filing the modification and the specified period of the modification with the City Clerk.

It has been determined by the City Manager that current circumstances warrant a modification of the beach closure hours to extend the closure from 10:00 p.m. until 4:00 a.m. rather than midnight until 4:00 a.m. In recent months, reports of municipal code violations, including physical altercations have occurred or originated on the beach during the late evening.

It is important to note that the beaches immediately adjacent to the City beaches in San Clemente close at 10:00 p.m. as do most of the beaches in Orange County. Consistent closure times will reduce confusion by visitors that may be unaware of the delineations between the City and State beaches.

If the City Council chooses to pursue a permanent modification to the hours of closure, the SCMC will need to be amended by Ordinance. For that purpose, both an Urgency Ordinance and a regular Ordinance have been prepared and attached hereto for consideration by the City Council.

A permanent closure will involve coordination with the California Coastal Commission and compliance with the Coastal Act. Section 30001 (c) of the Coastal Act states, “(c) That to promote the public safety, health, and welfare, and to protect public and private property, wildlife, marine fisheries, CITY OF SAN CLEMENTE Page 1 of 3 Printed on 6/2/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 10C
public safety, health, and welfare, and to protect public and private property, wildlife, marine fisheries, and other ocean resources, and the natural environment, it is necessary to protect the ecological balance of the coastal zone and prevent its deterioration and destruction.” This statement is further supported by the Coastal Act in Section 30005 Local governmental powers; nuisances; attorney general’s powers which indicates that “No provision of this division is a limitation on any of the following: (a) Except as otherwise limited by state law, on the power of a city or county or city and county to adopt and enforce additional regulations, not in conflict with this act, imposing further conditions, restrictions, or limitations with respect to any land or water use or other activity which might adversely affect the resources of the coastal zone. (b) On the power of any city or county or city and county to declare, prohibit, and abate nuisances.” The San Clemente City Code defines, in part, a nuisance as “Anything which is injurious to health or is indecent and offensive to the senses…” Clearly, many of the provision of the Coastal Act are consistent with the desire of the City Council to create a safe environment on the beach.

Finally, it should be noted that the hours of operation on the pier are not being changed at this time.

The pier will remain open until midnight and reopen at 4:00 a.m.

Council Options:

1. Move to support the action of the City Manager to modify the hours of closure from 12:00 a.m. until 4:00 a.m. to 10:00 p.m. until 4:00 a.m. on City beaches; adopt Urgency Ordinance 1751 amending Section 12.32.140 of the San Clemente Municipal Code to modify the closure hours of the beaches in the City; introduce and conduct a first reading on Ordinance No. 1752 amending Section 12.32.140 of the San Clemente Municipal Code; and find the actions categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines.

2. Move to support a temporary modification in different closure hours of City beaches and/or the pier by the City Manager, and find the action exempt from CEQA.

3. Adopt Urgency Ordinance 1751 amending Section 12.32.140 of the San Clemente Municipal Code to modify the closure hours of the beaches in the City, and find the ordinance exempt from CEQA.

4. Modify and adopt Urgency Ordinance 1751 amending Section 12.32.140 of the San Clemente Municipal Code, and find the ordinance exempt from CEQA.

5. Introduce and conduct a first reading on Ordinance No. 1752 amending Section 12.32.140 of the San Clemente Municipal Code to modify the closure hours of the beaches in the City, and find the ordinance exempt from CEQA.

6. Modify, introduce and conduct a first reading on Ordinance No. 1752 amending Section 12.32.140 of the San Clemente Municipal Code, and find the ordinance exempt from CEQA.

7. Continue the item and request additional information from staff.

8. Provide direction to the City Manager to keep the current closure hours between 12:00 a.m. and CITY OF SAN CLEMENTE Page 2 of 3 Printed on 6/2/2023
powered by Legistar™ 2
Meeting Date: 6/6/2023 Agenda Item: 10C
4:00 a.m.

Fiscal Impact:

None
Environmental Review/Analysis:

Staff recommends that the City Council determine the actions to be categorically exempt from CEQA under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA guidelines.

Recommended Actions:

Staff Recommendation

1. Support the action of the City Manager to modify the hours of closure from 12:00 a.m. until 4:00 a.m. to 10:00 p.m. until 4:00 a.m. on City Beaches.

2. Adopt Urgency Ordinance 1751 entitled “AN URGENCY ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN CLEMENTE, DECLARING A PUBLIC NUISANCE; AMENDING SECTION 12.32.140 OF THE SAN CLEMENTE MUNICIPAL CODE TO CLOSE THE PUBLIC BEACHES AT 10:00 P.M. FOR PUBLIC HEALTH, SAFETY AND WELFARE; AND FINDING THE

ORDINANCE TO BE CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) UNDER CLASS 1 (EXISTING FACILITIES, 14 CCR SECTION 15301) OF THE STATE CEQA GUIDELINES.”

3. Introduce and conduct a first reading by title only of Ordinance No. 1752 entitled “AN

ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN CLEMENTE, DECLARING A PUBLIC NUISANCE; AMENDING SECTION 12.32.140 OF THE SAN CLEMENTE MUNICIPAL CODE TO CLOSE THE PUBLIC BEACHES AT 10:00 P.M. FOR PUBLIC HEALTH, SAFETY AND WELFARE; AND FINDING THE ORDINANCE TO BE CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) UNDER CLASS 1 (EXISTING FACILITIES, 14 CCR SECTION 15301) OF THE STATE CEQA GUIDELINES.” Attachment:

1. Urgency Ordinance No. 1751

2. Ordinance No.1752
CITY OF SAN CLEMENTE Page 3 of 3 Printed on 6/2/2023
powered by Legistar™ 3
55452.01400\34554865.4
Attachment 1
URGENCY ORDINANCE NO. 1751

AN URGENCY ORDINANCE OF THE CITY COUNCIL OF

THE CITY OF SAN CLEMENTE, DECLARING A PUBLIC
NUISANCE; AMENDING SECTION 12.32.140 OF THE SAN

CLEMENTE MUNICIPAL CODE TO CLOSE THE PUBLIC
BEACHES AT 10:00 PM FOR PUBLIC HEALTH, SAFETY
AND WELFARE; AND FINDING THE ORDINANCE TO BE

CATEGORICALLY EXEMPT FROM THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT (CEQA) UNDER CLASS
1 (EXISTING FACILITIES, 14 CCR SECTION 15301) OF

THE STATE CEQA GUIDELINES
WHEREAS, Section 12.32.140 of the San Clemente Municipal Code (“SCMC”) currently provides for public beaches and the pier in the City of San Clemente, California (“City”) to close at midnight; and
WHEREAS, the City has conducted a survey of beach hours in both Orange and San Diego Counties, revealing that a vast majority of the beaches close at 10:00 p.m.; and
WHEREAS, the State beaches on either side of the City beaches close at 10:00 p.m., creating a situation where bad actors could congregate on City beaches for an additional two hours; and
WHEREAS, there have been a growing number of public safety incidents in the City in the past few weeks, many of which occur late in the evening when there are no lifeguards on duty and fewer members of the public around to witness the crimes; and WHEREAS, over Memorial Day weekend, two Marines were brutally attacked near the San Clemente public pier by a large gathering of youths and related crimes are quickly escalating in the City; and
WHEREAS, there is a need to take immediate action to reduce these crimes and protect public safety, health and welfare; and
WHEREAS, there is a current and immediate threat to the public health, safety, or welfare caused by keeping the public beaches open between the hours of 10:00 p.m. and midnight; and
WHEREAS, one of the stated purposes of the California Coastal Act is “promote the public safety, health, and welfare” as stated in Public Resources Code section 30001(c); and
4 55452.01400\34554865.4
Ordinance No. 1751 Page 2
WHEREAS, pursuant to Public Resources Code section 30005(b), “[n]o provision of [the Coastal Act] is a limitation…[o]n the power of any city or county or city and county to declare, prohibit, and abate nuisances”; and
WHEREAS, SCMC section 8.52.010 defines a public nuisance as including “[a]nything which is injurious to health or is indecent and offensive to the senses…”; and WHEREAS, keeping the public beaches open between the hours of 10:00 p.m. and midnight is injurious to public safety, health and welfare and constitutes a nuisance within the meaning of SCMC section 8.52.010; and
WHEREAS, to protect the public safety, health, and welfare, the City Council may adopt this ordinance as an urgency measure in accordance with Government Code section 36937(b).

NOW, THEREFORE, the City Council of the City of San Clemente does ordain as follows:

Section 1. The recitals above are each incorporated by reference and adopted as findings by the City Council.

Section 2. Based upon its review of the entire record, including the Staff Report, any public comments or testimony presented to the City Council, and the facts outlined below, the City Council hereby finds and determines that this Ordinance is categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines.

The Class 1 exemption specifically exempts from further CEQA review the operation, repair, maintenance, and minor repair of existing public or private structures, involving negligible or no expansion of use beyond that existing at the time of the lead agency’s determination. Here, the Ordinance involves maintaining an existing use with a reduction in hours of operation. Thus, the Ordinance qualifies for the Class 1 exemption.

Furthermore, none of the exceptions to the use of the Class 1 categorical exemptions identified in State CEQA Guidelines section 15300.2 apply. The Ordinance will not impact an environmental resource of hazardous or critical concern. The Ordinance will not result in a cumulative impact from successive projects of the same type in the same place, over time. There are no unusual circumstances surrounding the project that result in a reasonably possibility of a significant effect on the environment. The project will not damage scenic resources, including trees, rock outcroppings, or similar resources.

The project does not include any hazardous waste sites, and the project will not cause a substantial adverse change in the significance of a historical resource. There is no possibility that the project will cause a direct or reasonably foreseeable indirect effect on 5 55452.01400\34554865.4
Ordinance No. 1751 Page 3
the environment. Thus, the Class 1 exemption applies, and no further environmental review is required.

Section 3. Keeping the public beaches open between the hours of 10:00 p.m. and midnight is hereby declared to constitutes a public nuisance. This Ordinance is necessary to abate a public nuisance.

Section 4. Section 12.32.140 of the San Clemente Municipal Code is hereby amended to read as follows (underline indicates additions and strikethroughs represent deletions):

12.32.140 - Use of municipal pier and public beaches.

It shall be unlawful for any person to be upon or use the public pier between twelve (12:00) midnight and four (4:00) a.m. and any public beach of the City between the hours of ten (10:00) p.m. twelve (12:00) midnight and four (4:00) a.m. of the following day. In the event of special circumstances so warranting, the City Manager, in his or her judgment, is authorized and empowered to modify the hours established herein by first filing each such modification and the specified period thereof with the City Clerk. In addition, the City Council may by resolution modify the hours established herein for any business establishment which operates on the public pier or public beach if the Council determines in its sole discretion that such modification will not be contrary to the public health, safety or welfare.

Section 5. This ordinance takes effect immediately upon its adoption.

Section 6. If any provision of this Ordinance or its application to any person or circumstance is held to be invalid, such invalidity has no effect on the other provisions or applications of the Ordinance that can be given effect without the invalid provision or application, and to this extent, the provisions of this resolution are severable. The City Council declares that it would have adopted this Ordinance irrespective of the invalidity of any portion thereof.

Section 7. The City Council hereby enacts this urgency ordinance under California Government Code section 36937(b), which allows the City to adopt an urgency ordinance by not less than four-fifths vote for the immediate preservation of public peace, health or safety, subject to the findings herein. Upon adoption of this urgency ordinance, City Council directs staff to prepare, execute, and file with the Orange County Clerk a notice of exemption within five working days of the adoption of this Ordinance. 6 55452.01400\34554865.4
Ordinance No. 1751 Page 4
Section 8. The custodian of records for this ordinance is the San Clemente City Clerk, and the records compromising the administrative record for this Ordinance are located at 910 Calle Negocio, San Clemente, CA 92673.

APPROVED AND ADOPTED this ____day of June, 2023.

ATTEST:
_______________________________ __________________________ Laura Campagnolo, City Clerk Chris Duncan, Mayor

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, hereby certify that Urgency Ordinance No. 1751, the reading in full thereof unanimously waived, was duly passed and adopted at a regular meeting of the City Council held on the _____day of June, 2023, and said ordinance was adopted by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of ______________________, 2023. __________________________
Laura Campagnolo, City Clerk
APPROVED AS TO FORM:
__________________________
Elizabeth A. Mitchell, City Attorney
7 55452.01400\34554865.4
Attachment 2
ORDINANCE NO. 1752

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
SAN CLEMENTE, DECLARING A PUBLIC NUISANCE;
AMENDING SECTION 12.32.140 OF THE SAN CLEMENTE

MUNICIPAL CODE TO CLOSE THE PUBLIC BEACHES AT
10:00 PM FOR PUBLIC HEALTH, SAFETY AND
WELFARE; AND FINDING THE ORDINANCE TO BE

CATEGORICALLY EXEMPT FROM THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT (CEQA) UNDER CLASS
1 (EXISTING FACILITIES, 14 CCR SECTION 15301) OF

THE STATE CEQA GUIDELINES
WHEREAS, Section 12.32.140 of the San Clemente Municipal Code (“SCMC”) currently provides for public beaches and the pier in the City of San Clemente, California (“City”) to close at midnight; and
WHEREAS, the City has conducted a survey of beach hours in both Orange and San Diego Counties, revealing that a vast majority of the beaches close at 10:00 p.m.; and
WHEREAS, the State beaches on either side of the City beaches close at 10:00 p.m., creating a situation where bad actors could congregate on City beaches for an additional two hours; and
WHEREAS, there have been a growing number of public safety incidents in the City in the past few weeks, many of which occur late in the evening when there are no lifeguards on duty and fewer members of the public around to witness the crimes; and WHEREAS, over Memorial Day weekend, two Marines were brutally attacked near the San Clemente public pier by a large gathering of youths and related crimes are quickly escalating in the City; and
WHEREAS, there is a need to take immediate action to reduce these crimes and protect public safety, health and welfare; and
WHEREAS, there is a current and immediate threat to the public health, safety, or welfare caused by keeping the public beaches open between the hours of 10:00 p.m. and midnight; and
WHEREAS, one of the stated purposes of the California Coastal Act is “promote the public safety, health, and welfare” as stated in Public Resources Code section 30001(c); and
8 55452.01400\34554865.4
Ordinance No. 1752 Page 2
WHEREAS, pursuant to Public Resources Code section 30005(b), “[n]o provision of [the Coastal Act] is a limitation…[o]n the power of any city or county or city and county to declare, prohibit, and abate nuisances”; and
WHEREAS, SCMC section 8.52.010 defines a public nuisance as including “[a]nything which is injurious to health or is indecent and offensive to the senses…”; and WHEREAS, keeping the public beaches open between the hours of 10:00 p.m. and midnight is injurious to public safety, health and welfare and constitutes a nuisance within the meaning of SCMC section 8.52.010; and
NOW, THEREFORE, the City Council of the City of San Clemente does ordain as follows:

Section 1. The recitals above are each incorporated by reference and adopted as findings by the City Council.

Section 2. Based upon its review of the entire record, including the Staff Report, any public comments or testimony presented to the City Council, and the facts outlined below, the City Council hereby finds and determines that this Ordinance is categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines.

The Class 1 exemption specifically exempts from further CEQA review the operation, repair, maintenance, and minor repair of existing public or private structures, involving negligible or no expansion of use beyond that existing at the time of the lead agency’s determination. Here, the Ordinance involves maintaining an existing use with a reduction in hours of operation. Thus, the Ordinance qualifies for the Class 1 exemption.

Furthermore, none of the exceptions to the use of the Class 1 categorical exemptions identified in State CEQA Guidelines section 15300.2 apply. The Ordinance will not impact an environmental resource of hazardous or critical concern. The Ordinance will not result in a cumulative impact from successive projects of the same type in the same place, over time. There are no unusual circumstances surrounding the project that result in a reasonably possibility of a significant effect on the environment. The project will not damage scenic resources, including trees, rock outcroppings, or similar resources.

The project does not include any hazardous waste sites, and the project will not cause a substantial adverse change in the significance of a historical resource. There is no possibility that the project will cause a direct or reasonably foreseeable indirect effect on the environment. Thus, the Class 1 exemption applies, and no further environmental review is required.
9 55452.01400\34554865.4
Ordinance No. 1752 Page 3
Section 3. Keeping the public beaches open between the hours of 10:00 p.m. and midnight is hereby declared to constitutes a public nuisance. This Ordinance is necessary to abate a public nuisance.

Section 4. Section 12.32.140 of the San Clemente Municipal Code is hereby amended to read as follows (underline indicates additions and strikethroughs represent deletions):

12.32.140 - Use of municipal pier and public beaches.

It shall be unlawful for any person to be upon or use the public pier between twelve (12:00) midnight and four (4:00) a.m. and any public beach of the City between the hours of ten (10:00) p.m. twelve (12:00) midnight and four (4:00) a.m. of the following day. In the event of special circumstances so warranting, the City Manager, in his or her judgment, is authorized and empowered to modify the hours established herein by first filing each such modification and the specified period thereof with the City Clerk. In addition, the City Council may by resolution modify the hours established herein for any business establishment which operates on the public pier or public beach if the Council determines in its sole discretion that such modification will not be contrary to the public health, safety or welfare.

Section 5. This Ordinance shall takes effect 30 days after its adoption or upon securing any approvals, if necessary, and as applicable by the California Coastal Commission, whichever is later.

Section 6. If any provision of this Ordinance or its application to any person or circumstance is held to be invalid, such invalidity has no effect on the other provisions or applications of the Ordinance that can be given effect without the invalid provision or application, and to this extent, the provisions of this resolution are severable. The City Council declares that it would have adopted this Ordinance irrespective of the invalidity of any portion thereof.

Section 7. The City Clerk shall certify the adoption of this ordinance and cause it, or a summary of it, to be published within fifteen (15) days of adoption in a newspaper of general circulation printed and published within the City of San Clemente, and shall post a certified copy of this ordinance, including the vote for and against the same, in the Office of the City Clerk in accordance with California Government Code section 36933. 10 55452.01400\34554865.4
Ordinance No. 1752 Page 4
Section 7. The custodian of records for this ordinance is the San Clemente City Clerk, and the records compromising the administrative record for this Ordinance are located at 910 Calle Negocio, San Clemente, CA 92673.

APPROVED AND ADOPTED this ____ day of June, 2023.

ATTEST:
_______________________________ __________________________ Laura Campagnolo, City Clerk Chris Duncan, Mayor

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, hereby certify that Ordinance No. 1752 having been regularly introduced at the meeting of _______________________, was again introduced, the reading in full thereof unanimously waived, and duly passed and adopted at a regular meeting of the City Council held on the _____day of June, 2023, and said ordinance was adopted by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of ______________________, 2023. __________________________
Laura Campagnolo, City Clerk
APPROVED AS TO FORM:
__________________________
Elizabeth A. Mitchell, City Attorney
11 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 13C(1)
Department: City Clerk
Prepared By Laura Campagnolo, City Clerk
-
Subject:

UPDATE TO COUNCIL APPOINTEES TO REGIONAL COMMITTEES, COMMISSIONS AND

BOARDS AND CITY COUNCIL SUBCOMMITTEES
Summary:

Councilmember Gene James resigned from City Council on April 29, 2023. Mr. James’ vacancy on the City Council also left vacancies on some of the City’s Regional Commissions and Committees as well as City Council subcommittees for which Mr. James was the City’s representative.

At its Special Meeting of May 23, 2023, Council appointed Rick Loeffler to fill the open seat on Council. Council may wish to appoint Councilmember Loeffler to sit on the Regional Commissions and Committees and Council subcommittees left vacant as a result of Mr. James’ resignation, or Council may choose to consider making changes to all of the Regional Commissions and Committees and Council subcommittee appointments.

Council Options:
· Appoint Councilmember Loeffler to the Regional Commissions and Committees and Council subcommittees previously held by former Councilmember James. · Review and modify the entire list of Regional Commissions and Committees and City Council subcommittees and reassign Councilmembers to fill each of the available seats. · Provide Staff further direction.
· Take no action.

Fiscal Impact:

None.

Environmental Review/Analysis:

This is not a project under CEQA.

Recommended Actions:

Staff Recommendation
Select Council representatives to fill the openings on Regional Commissions and Committees and Council subcommittee left vacant as a result of Mr. James’ resignation.

CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 13C(1)
Attachment:

1. List of 2023 Council Appointed Representatives to Committees.

2. List of City Council Subcommittees.

Notification:

None.

CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/1/2023
powered by Legistar™ 2
ATTACHMENT 1
2023 COUNCIL APPOINTED REPRESENTATIVES

TO COMMITTEES, COMMISSIONS AND BOARDS
Committee/Commission/Board Location Meeting
Date(s)
Representative(s) Compensation
Capistrano Unified School District
Liaison Committee
Duncan and Enmeier No
Coastal Animal Services Authority
(CASA)
Animal
Shelter
San
Clemente
3 rd Monday,
5:30 p.m.

Bi-monthly
James/Enmeier (Alt.) No
Community Engagement Panel Varies Quarterly
(dates vary)
Cabral/Enmeier (Alt.) No
Conservancy (Elected/Appointed
Representative to Friends of the
Reserve Commission)
Knoblock/Duncan (Alt.)
The City's “At Large”
position is vacant.

No
The Talega HOA
Representative is
Laurie Gooch (term
expires June 30, 2020).

The At-Large and
Talega Representative
positions will not be
filled until CM Knoblock
reports to Council with
regard to the Friends’
inactivity.

Chamber of Commerce – Economic
Development
City Hall
Conference
Room
As Set James/Cabral (Alt).

Note: The Mayor will
continue to attend
ribbon-cutting
ceremonies.

No
Downtown Business Association –
Economic Development
As set Duncan/James (Alt). No
Emergency Operational Area Council
(Orange County)
Mayor and Mayor Pro
Tem
No
Fire Authority (Orange County) OCFA 4
th Thursday Duncan Yes ($100 per
Boardroom, 1 of every meeting with
Fire Authority other month maximum of $300
Road, Irvine at 6:30 p.m. per month).

Special notes: This
appointment must
be made by
resolution.

Alternates were
discontinued in
2015.

Historic Preservation Ad Hoc
Committee
TBD TBD James/Enmeier (Alt.) No
Insurance Authority (California Joint
Powers Insurance Authority)
La Palma 4
th
Wednesday,
4:30 p.m.

Knoblock Yes, $100 per
year.

Investment Advisory Committee Ocean View
Conf. Room
Quarterly,
6:00 p.m.

Last Monday
of the month
Cabral No
Legislative Delegate Program -
Representative to Senate District 36
Mayor and Mayor Pro
Tem
No
3 Legislative Delegate Program -
Representative to 74th Assembly
District
Mayor and Mayor Pro
Tem
No
Library Task Force (Orange County) Tustin Library Quarterly, 4 th
Thursday,
4:00 p.m.

Enmeier No
Mayors (South Orange County
Association of Mayors)
Rotating
Cities
2 nd
Thursday,
7:30 a.m.

Mayor No
U.S. Marine Corps Liaison James No
MWDOC Interaction of Elected
Officials
Knoblock/Duncan
(Alt.)
No
Nine South County Water Agencies
(This is the name of a group that
consists of nine South Orange County
water agencies).

Moulton
Niguel Water
District Office
No regular
meetings,
but usually
held at noon
on
Wednesdays
(such as the
fourth
Wednesday
of the
month).

Knoblock/Duncan
(Alt.)
No
SCAG General Assembly Annual
Meeting in
May
Knoblock/Cabral No
Social Service/Community Service
Budget Committee
Enmeier No
South Orange County Watershed
Management Area Executive
Committee
Knoblock/Rebensdorf
(Alt.)
No
Vector
(Orange County Mosquito and Vector
Control Board)
District
Office,
Garden
Grove
3 rd
Thursday,
3:00 p.m.

Knoblock (term expires
January 2024)
Yes ($100 per
month)
Wall of Recognition Duncan No
4 Subcommittee List ATTACHMENT 2
Name Date Active Council Member Appointed Staff Recommendation / Notes Design Review Subcommittee 10Ͳ16Ͳ2007 YES
None; members are Planning
Commissioners per SCMC 2.32.020.E No action
San Clemente Healthcare
Subcomittee 10Ͳ21Ͳ2014 YES James & Duncan (1Ͳ18Ͳ22)
Subcommittee directed staff to postpone
healthcare update.

Transportation Subcommittee 1Ͳ20Ͳ2017 YES James & Cabral (2Ͳ7Ͳ23) Amphitheater Citizens Committee August 2022 YES
Each Councilmember to appoint one
member
Homeless Subcommittee January 2023 YES Cabral and Enmeier Sucommittee formed at January 17, 2023
City Council meeting
5 AGENDA REPORT

CITY OF SAN CLEMENTE
City Council Meeting
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Meeting Date: 6/6/2023 Agenda Item: 13C(2)
Department: City Clerk
Prepared By Laura Campagnolo, City Clerk
-
Subject:

VACANCY ON THE PUBLIC SAFETY COMMITTEE DUE TO THE APPOINTMENT OF RICK

LOEFFLER TO CITY COUNCIL
Summary:

The recent appointment of Rick Loeffler to the City Council has created a vacancy on the Public Safety Committee. Councilmember Loeffler’s term on the Public Safety Committee was set to expire on June 30, 2024.

The Public Safety Committee consists of five members, all of which are technical professionals with a Public Safety background. The Public Safety Committee’s major functions include reviewing public safety performance measures and making recommendations to City Council. Members of the Public Safety Committee need not be residents of San Clemente.

The Committee also includes one representative of the Orange County Sheriff Department (OCSD), appointed by San Clemente's Chief of Police Services, one representative of the Orange County Fire Authority (OCFA), appointed by San Clemente's Chief of Fire Services, and one representative from the City's Marine Safety Division, appointed by the City Manager. The OCSD, OCFA and Marine Safety Division representatives serve as ex-officio, non-voting members.

At this time, Council has the discretion to either direct Staff to solicit applications to fill the one-year term on the Public Safety Committee or leave the position vacant.

Council Options:
· Direct Staff to advertise to fill the vacancy on the Public Safety Committee and schedule interviews and appointment of a Committee member for July 18, 2023 at 4:00 p.m. · Leave the position vacant.
· Direct Staff to return with additional information.

Fiscal Impact:

None.

Environmental Review/Analysis:

None.

CITY OF SAN CLEMENTE Page 1 of 2 Printed on 6/1/2023
powered by Legistar™ 1
Meeting Date: 6/6/2023 Agenda Item: 13C(2)
Recommended Actions:

Staff Recommendation

1. Direct Staff to advertise for the vacancy on the Public Safety Committee and solicit applications for a technical professional with a public safety background to fill the position.

2. Schedule a meeting on July 18, 2023 at 4:00 p.m. to interview applicants and appoint a member to the Public Safety Committee.

Attachment:

None.

Notification:

None.

CITY OF SAN CLEMENTE Page 2 of 2 Printed on 6/1/2023