Cities Index.
6. LSSP.pdf

San Clemente City Council
June 6, 2023

Document
6. LSSP.pdf
Meeting
June 6, 2023
Body
San Clemente City Council
Pages
22
Original file
2.7 MB
Text extracted from the city's file for reading and search. Open the original on san-clemente.legistar1.com. That file is the official record.
Page 1 ends

LOCAL SIGNAL SYNCHRONIZATION PLAN CONSISTENCY REVIEW CHECKLIST The Local Agency Name: _City of San Clemente__________ Plan Date: __ _ Local Agency Statement Page #s in LSSP Provided or
N/A

1. Signal synchronization goals of the agency are consistent with those outlined as part of the Regional Traffic Signal Synchronization Master Plan.

Pages 3 – 5 Provided

2. Traffic signal synchronization street routes are identified, including all corridors along the regional signal
synchronization network located within the local agency.

Pages 6 – 7 Provided

3. Traffic signal inventory for all traffic signal synchronization street routes. Pages 8 – 11 Provided

4. Three-year plan separately showing costs, available
funding, and phasing for capital, operations, and
maintenance of signal synchronization along the traffic signal synchronization street routes and traffic signals which may include unconstrained and build-out scenarios.

Pages 12 – 15 Provided

5. Signal synchronization review, revision, and assessment of synchronization activities along the traffic signal
synchronization street routes and traffic signals.

Pages 16 - 22 Provided
I certify that the above statements are true to the best of my knowledge. ___________________________________________________ _________________ Signature Date
Kiel Koger, Public Works Director/City Engineer
_____________________________________________________________________ Printed Name, Title
ATTACHMENT 6

Page 2 ends

LOCAL SIGNAL SYNCHRONIZATION PLAN
(LSSP)
June 2023

Page 3 ends

SECTION ONE

TRAFFIC SIGNAL SYNCHRONIZATION GOALS, POLICIES AND

OBJECTIVES

Page 4 ends

Traffic Signal Synchronization Goals, Policies and Objective The City of San Clemente aligns with the Measure M2 Regional Traffic Signal Synchronization Program goals, which promote a collaborative, corridor-based approach that improves the performance of traffic signals based on existing traffic patterns. The City supports the local agency's responsibility for control of signal timing and working with neighboring agencies to develop adequate signal synchronization timing.

Signal Synchronization is an economical way to decrease overall stops, travel delays, and traffic-related congestion across city boundaries. This Local Signal Synchronization Plan (LSSP) defines specific goals, routes, and equipment required to ensure network operability with maximum traffic management efficiency. Goals for the City of San Clemente’s signal synchronization include:
x Create a balanced transportation network that provides mobility and access for all modes of travel, including motor vehicles, transit, bicyclists, pedestrians, and rail traffic.
x Provide an efficient and effective transportation circulation system. x Work cooperatively with the Orange County Transportation Authority (OCTA), Caltrans, and neighboring agencies to synchronize traffic signals throughout Orange County on a corridor basis to improve travel time and reduce stops. x Continue to coordinate with neighboring agencies in the development of multiagency synchronization timing and compatible traffic signal timing technical parameters.
x Maintain local control responsibility for signals within the City’s jurisdiction and control.
x Improve traffic flow in San Clemente by developing and implementing optimized traffic signal synchronization.
x Optimize signal timing to provide drivers better travel experience through reduced travel times, reduced stops, and reduced delays. x The strategies for signal synchronization will facilitate consistent operating speeds along the key corridors and provide a good level of public perception. x Participate in Project P Traffic Forums.
x Review and revise signal timing, when necessary, along traffic signal synchronization routes.
x Provide ongoing maintenance and operation through a) monitoring and improving optimized signal timing and b) communications and detection support. x Identify future signal corridor improvements by recommending system and equipment enhancements to improve traffic flow and signal synchronization. x Lead additional signal timing synchronization projects through Project P for planned (candidate) corridors.
x Complete upcoming signal synchronization projects and develop final reports for the signal synchronization projects within six months of completion to include findings and an assessment of the performance of synchronization activities.

Page 5 ends

The City of San Clemente has collaborated with OCTA, Caltrans, and Dana Point to optimize the signal timing synchronization for two primary corridors (Avenida Pico and El Camino Real/Pacific Coast Highway) and three local corridors (Avenida Vista Hermosa, Camino De Los Mares/Camino De Estrella, and Camino Vera Cruz) as part of Project P and the Regional Traffic Signal Synchronization Master Plan. These projects involved replacing the existing traffic signal controllers with Intelight X3 Type ATC controllers that the City can remotely monitor and manage using MaxView software at the Engineering Building and the Public Works Maintenance Facility. The projects also developed synchronized timing plans for multiple peak periods based on the current traffic patterns and road configurations. The projects considered the impact of crossstreet traffic and special traffic generators such as schools and businesses. These projects aimed to provide state-of-practice intersection control and communication along the signal synchronization corridors.

The projects under consideration (including candidate Project P) seek the efficiency of traffic flow and the enhancement of the signal system security. The Traffic Management Software and Server Upgrades project includes upgrading the traffic management software with Kinetic Signals and replacing the server with the latest technology. The Avenida Palizada and El Camino Real project intents to improve the traffic flow and reduce delays by coordinating the traffic signal along the roadway segments. The Avenida Talega, Avenida Saluda, and Avenida La Pata projects involve updating the detection system using radar or thermal technology and switching the signal interconnection from copper to fiber.

Page 6 ends

SECTION TWO

TRAFFIC SIGNAL SYNCHRONIZATION STREET ROUTES
(EXISTING AND PLANNED)

Page 8 ends

SECTION THREE

TRAFFIC CONTROL INVENTORY

Traffic Synchronization Inventory
Corridor Cross Street Intersection AM MID PM WKND
Maintenance
Responsibility Cabinet Type Software Detection
Bike
Detection CCTV
Power
Backup Comm Other ITS ATMS Status
Avenida Pico El Camino Real (33) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Fiber N/A Maxview Online Agua Nueva (18) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineAvenida Vista Hermosa West (17) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineCalle De Los Molinos (16) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle De Industrias (15) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineI-5 SB Ramp 110/120 80 100 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineI-5 NB Ramp 80-120 100 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineHigh School Entrance (14) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineTriton Way (13) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineAvenida Presidio/Calle Frontera (12) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineGateway Plaza (11) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle Del Cerro (10) 120 120 130 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle Amanecer (9) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCamino Vera Cruz (8) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlinePlaza Pacifica West (7) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlinePlaza Pacifica East (6) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineAvenida La Pata (5) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCourtyards (4) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineAvenida Vista Hermosa East (3) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCalle Alicante (2) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCamino Celosia (1) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online El Camino Real/
Pacific Coast Highway Camino Capistrano (30) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Fiber N/A Maxview Online Camino San Clemente (31) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Wireless N/A Maxview OnlineAvenida Estacion (32) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Wireless N/A Maxview OnlineAvenida Pico (33) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Fiber N/A Maxview OnlineCalle De Los Molinos (34) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineEl Portal (35) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineMariposa (36) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Palizada (37) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Fiber N/A Maxview OnlineAvenida Del Mar (38) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineAvenida Victoria (39) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Presidio (40) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Barcelona (41) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineI-5 SB Off-Ramp/Avenida Valencia 80 80 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineI-5 NB Off-Ramp 80 80 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineE. Avenida San Juan 80 80 80 80 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineAvenida San Gabriel (42) 100 100 100 100 San Clemente P (TS1) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineI-5 NB Ramp 100 100 100 100 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineAvenida Mendocino (43) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Wireless N/A Maxview OnlineAvenida San Luis Rey (44) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview Online Cycle Length Equipment
San Clemente - 2023 LSSP Inventory_2023_Submittal.xlsx Page 9 Traffic Synchronization Inventory
Corridor Cross Street Intersection AM MID PM WKND
Maintenance
Responsibility Cabinet Type Software Detection
Bike
Detection CCTV
Power
Backup Comm Other ITS ATMS Status
Cycle Length Equipment
Camino De Los Mares/Camino De Estrella Camino Mira Costa (100) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Avenida Las Palmas (99) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineFreeway I-5 SB Ramp Free Free Free Free Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineFreeway I-5 NB Ramp Free Free Free Free Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineCamino El Molino (98) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCalle Agua (97) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineOcean View Plaza (96) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineHospital Entrance (95) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineMarbella (94) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineAvenida Vaquero (93) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCalle Nuevo (92) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlinePortico Del Sur (91) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCamino Vera Cruz (90) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Avenida Vista Hermosa W. Avenida Pico (17) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview Online Via Cannon Verde (72) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineOutlets at San Clemente (71) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida Costa Azul (70) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlinePark/School Access (69) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops Yes N/A BBS Fiber N/A Maxview OnlineI-5 SB Ramp 120 120 120 90 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineI-5 NB Ramp 120 120 120 90 Caltrans 332 2070 TSCP Loops Yes N/A BBS GPS N/A TransSuite OfflineCalle Frontera (68) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCamino Laurel (67) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineVia Turqueza (66) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCamino Vera Cruz (65) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineTarget/Sports Park (64) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineAvenida La Pata (63) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineVia Suerte (62) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineAvenida Talega (61) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCamino La Pedriza (60) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineE. Avenida Pico (3) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Camino Vera Cruz Avenida Pico (8) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Plaza Pacifica (167) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineVia Pacifica (168) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle Paradiso (169) 120 120 120 120 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle Sarmentoso (170) 80 80 80 80 San Clemente P (TS2 Type 2) MaxTime MaxTime Radar No N/A BBS Wireless N/A Maxview OnlineCosta (173) 80 80 80 80 San Clemente P (TS1) MaxTime MaxTime Loops Yes N/A BBS Wireless N/A Maxview OnlineColina Rodante/Montana Del Sol (171) 80 80 80 80 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCalle De Los Arboles/Camino De La Ladera (172) 80 80 80 80 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview OnlineCamino De Los Mares (90) 100 100 100 100 San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Avenida La Pata Calle Amanecer (164) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview Online Traffix Devices (163) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCamino Del Rio (157) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Fiber N/A Maxview Online San Clemente - 2023 LSSP Inventory_2023_Submittal.xlsx Page 10 Traffic Synchronization Inventory
Corridor Cross Street Intersection AM MID PM WKND
Maintenance
Responsibility Cabinet Type Software Detection
Bike
Detection CCTV
Power
Backup Comm Other ITS ATMS Status
Cycle Length Equipment
Fire Station #59 (162) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCalle Saluda (156) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview Online Avenida Talega Calle Careyes East/Camino Viento Fuerte (158) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Copper N/A Maxview Online Calle Careyes West/Camino Viento Fuerte (159) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video Yes N/A BBS Copper N/A Maxview OnlineCalle Portofino (161) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Copper N/A Maxview OnlineCalle Saluda (160) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview Online Calle Saluda Avenida Fresas/Via Catarina (152) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCalle Saluda Liberty Park (153) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineAvenida Del Mar Ola Vista (165) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineAvenida Del Presidente Concordia Elementary School (166) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Loops No N/A BBS Wireless N/A Maxview OnlineAvenida Vaquero Via Cascadita (151) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineAvenida Palizada Avenida de la Estrella (45) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Fiber N/A Maxview OnlineCalle Amanacer Calle Negocio (155) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCalle Del Cerro Avenida Vista Montana (154) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview OnlineCamino Capistrano Avenida Vaquero (151) Free Free Free Free San Clemente P (TS2 Type 2) MaxTime MaxTime Video No N/A BBS Copper N/A Maxview Online -- Synchronized Corridor-- Stand-alone Signalized Intersection -- Updated Change San Clemente - 2023 LSSP Inventory_2023_Submittal.xlsx Page 11

Page 12 ends

SECTION FOUR

TRAFFIC SIGNAL SYNCHRONIZATION SYSTEM AND THREE

YEAR PLAN

Page 13 ends

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Constrained)
Reporting Jurisdiction Expenditures: City of San Clemente _

MAINTENANCE
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Communication and Software Maintenance $1,200 $1,200 $1,200 $3,600 City Staff time (Engineering) $5,200 $5,200 $5,200 $15,600 City Staff time (Maintenance) $3,000 $3,000 $3,000 $9,000 Subtotal Maintenance $9,400 $9,400 $9,400 $28,200

CONSTRUCTION
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Citywide Signal Synchronization $0 $0 $0 $0
Subtotal Construction $0 $0 $0 $0

OPERATIONS
Citywide Signal Timing Maintenance FY23/24 FY24/25 FY25/26 TOTAL Consultant Fees $0 $0 $0 $0
City Staff time (Engineering) $12,500 $12,500 $12,500 $38,750 City Staff time (Maintenance) $6,050 $6,050 $6,050 $18,150 Subtotal Operations $18,550 $18,550 $18,550 $55,650
FY Total $27,950 $27,950 $27,950 $83,850

Page 14 ends

3-YEAR OUTLOOK

TRAFFIC SIGNAL SYNCHRONIZATION
Funding Needs for Synchronized Operation (Unconstrained) Reporting Jurisdiction Expenditures: City of San Clemente _

MAINTENANCE
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Communication and Software
Maintenance (maintenance by system's
vendor)
$12,650 $12,650 $25,300
City Staff time (Engineering) $6,765 $6,765 $6,765 $20,295 City Staff time (Maintenance) $6,655 $6,655 $6,655 $19,965 Subtotal Maintenance $13,420 $26,070 $26,070 $65,560

CONSTRUCTION
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Traffic Management Software and Server
Upgrades $22,000 $22,000
Avenida Palizada and El Camino Real $24,000 $100,000 $124,000 Avenida Talega and Avenida Saluda $350,000 $350,000
Avenida La Pata $300,000 $300,000
Subtotal Construction $46,000 $450,000 $300,000 $796,000

OPERATIONS
PROJECT FY23/24 FY24/25 FY25/26 TOTAL
Consultant Fees for project management
and technical support. $55,000 $22,000 $22,000 $99,000
City Staff time (Engineering) $13,530 $13,530 $13,530 $40,590 City Staff time (Maintenance) $6,655 $6,655 $6,655 $19,965 Subtotal Operations $75,185 $42,185 $42,185 $159,555
FY Total $134,605 $518,255 $368,255 $1,021,115

Page 15 ends

LSSP IMPLEMENTATION – CANDIDATE SIGNAL

SYNCHORNIZATION PROJECTS WITH ESTIMATED COSTS

TO COMPLETE PLANNED NETWORK
Reporting Jurisdiction Expenditures: City of San Clemente

CORRIDOR IMPROVEMENT SUMMARY ESTIMATED
COST
Traffic Management
Software and Server
Upgrades
Upgrade Advanced Traffic Management
Software from MaxView to Kinetic Signals,
and Server.
$22,000
Avenida Palizada and El
Camino Real
Synchronize signal timing along Avenida
Palizada and El Camino Real. $124,000
Avenida Talega and
Avenida Saluda
Update detection system using possibly
radar or thermal technology; Upgrade signal
Interconnect from copper to fiber.
$350,000
Avenida La Pata
Update detection system using possibly
radar or thermal technology; Upgrade signal
Interconnect from copper to fiber.
$300,000
Total Estimated Cost $796,000

Page 16 ends

SECTION FIVE

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT

REVIEW AND REVISE, AS MAY BE NECESSARY, THE TIMING

OF TRAFFIC SIGNALS
Significant timing plan updates and projects completed FY 2020/2021 through 2022/2023

Page 17 ends

Signal Synchronization Timing Review, Revision, and Assessment To accommodate the new bell schedule of San Clemente High School, the City extended the traffic signal Day Plan 1 from 15:15 to 15:50 for the five (5) Avenida Pico intersections at Calle Del Cerro, Gateway Plaza, Avenida Presidio/Calle Frontera, Triton Way, and High School Entrance on August 15, 2023.

The City of San Clemente will update timing plans periodically. On-going maintenance and operation will be provided by monitoring and improving optimized signal timing through communications and detection support.

Page 18 ends

TRAFFIC SIGNAL SYNCHRONIZATION REVISION

LOCAL AGENCY

CORRIDOR
TIMING

REVIEWED
(Past 3 Years)

DID TIMING

REQUIRE
AN
UPDATE?
TIMING UPDATE RESULTS (if available)
Speed Travel Stops per mile Greens per red CSPI Score*
Before After Before After Before After Before After
Avenida Pico 2022 Yes Studies not yet available.

The City extended the traffic signal Day Plan 1 from 15:15 to 15:50 for the five (5) Avenida Pico intersections at Calle Del Cerro, Gateway Plaza, Avenida Presidio/Calle Frontera, Triton Way, and High School Entrance on August 15, 2023.

Index Name Limit Average Score Green/Stop Score # of Stop per Mile Score Score Level Emissions Rate (g/mi) Emission Level AM 29.6 29.4 4.2 33.8 2.1 19.2 82.5 I 30.0 332.5 1
MD 26.3 24.4 3.9 31.2 2.6 17.0 72.6 II 26.0 364.8 1
PM 28.9 28.4 4.0 31.8 2.3 17.1 77.4 II 29.0 339.4 1
Average 28.3 27.4 4.0 32.3 2.3 17.0 76.7 II 28.0 347.1 1 AM 28.3 27.5 3.4 27.1 1.2 28.0 82.6 I 28.0 347.1 1
MD 27.7 26.5 2.8 22.1 1.3 26.9 75.6 II 28.0 347.1 1
PM 26.3 24.4 2.7 21.6 1.3 26.9 72.9 II 26.0 364.8 1
Average 27.4 26.1 3.0 23.6 1.3 27.3 77.0 II 27.0 355.5 1 AM 27.3 26.0 4.5 35.8 2.1 19.0 80.8 I 27.0 355.5 1
MD 26.3 24.4 3.8 30.6 2.1 18.5 73.5 II 26.0 364.8 1
PM 26.2 24.2 4.1 32.9 2.1 18.8 75.9 II 26.0 364.8 1
Average 26.6 24.9 4.1 33.1 2.1 18.8 76.7 II 27.0 355.5 1 AM 22.0 18.0 3.1 24.8 1.9 20.9 63.7 III 22.0 410.3 2
MD 25.1 22.7 2.5 19.7 2.1 19.2 61.5 III 25.0 374.8 1
PM 25.8 23.7 2.4 19.0 2.2 18.2 60.9 III 26.0 364.8 1
Average 24.3 21.4 2.6 21.2 2.1 19.4 62.0 III 24.0 385.8 1

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT
(Source: 2021 Orange County Corridor Performance)
Roadway Distance
(mi) Peak Hour
CO2 Emission CSPI # of Stop per Mile Green/Stop Speed Rounded Speed
C70C71
Camino De Los MaresAvenida Vista HermosaAvenida PicoPCH Coast Hway/El Camino Real C72
C90A
1 to 21 to 31 to 41 to 6

2.52.94.36.7

Page 19 ends

Index Name Limit 2021 CV 2011 FC 2021 CV 2011 FC 2021 CV 2011 FC Improve or Degrade C70 Camino De Los Mares 1 to 2 2.5 28.3 30.1 4.0 2.3 2.3 1.0 76.7 II 78.3 II Degraded Value in Same TierC71 Avenida Vista Hermosa 1 to 3 2.9 27.4 26.1 3.0 1.5 1.3 1.2 77.0 II 63.8 III Improved TierC72 Avenida Pico 1 to 4 4.3 26.6 28.9 4.1 2.7 2.1 1.2 76.7 II 78.3 II Degraded Value in Same Tier C90A PCH Coast Hway/El Camino Real 1 to 6 6.7 24.3 29.1 2.6 2.1 2.1 0.9 62.0 III 75.7 II Degraded Tier 2021 CV 2011 FC
CSPI

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT
(Source: 2021 CV vs 2011 FC Orange County Corridor Performance - AM/MD/PM Average) Roadway Distance
(mi)
Speed Green/Stop # of Stop per Mile

Page 20 ends

Index Name Limit 2021 CV 2019 FC 2021 CV 2019 FC 2021 CV 2019 FC Improve or Degrade C70 Camino De Los Mares 1 to 2 2.5 28.3 30.1 4.0 2.3 2.3 1.0 76.7 II 78.3 II Degraded Value in Same TierC71 Avenida Vista Hermosa 1 to 3 2.9 27.4 26.1 3.0 1.5 1.3 1.2 77.0 II 63.8 III Improved TierC72 Avenida Pico 1 to 4 4.3 26.6 28.9 4.1 2.7 2.1 1.2 76.7 II 78.3 II Degraded Value in Same Tier C90A PCH Coast Hway/El Camino Real 1 to 6 6.7 24.3 24.3 2.6 2.0 2.1 1.0 62.0 III 71.1 II Degraded Tier

TRAFFIC SIGNAL SYNCHRONIZATION ASSESSMENT
(Source: 2021 CV vs 2019 FC Orange County Corridor Performance - AM/MD/PM Average) Roadway Distance
(mi)
Speed Green/Stop # of Stop per Mile CSPI
2021 CV 2019 FC

Page 21 ends


 







 

 
 




 

 
 




 










  





 
 


 







 







 








   



 

  
























 !" #$#


%&'()
**+,%'($%*'-.,


/
/
%$0
(1#
('
) - '$


/+*2 3$#/
4
5-.,

          
 
     
 
 
   

*"+3

6($(3"++ '$(#*7
1$ -8 +
5) (# 39 3:;%$9
1+%*+$*

())7*++*2 3$#<)%&%8) 7*+7"',%'&"1*'3*-1) $%*'1 + "%, )%' #

*++%,*+
0'39+*'%=($%*' +7*+-('3 
', .
)%&%8) 
*++%,*+
"++ '$)0"', ,
*++%,*+<
% +
% +

% +

% +

% +

 ##$9('>
>
$*?
?
5 @$*A
A
5 @$*B

*+ $9('B

@
5>

%) #



*++%,*+1 +($%*'() +7*+-('3
('
) - '$

Page 22 ends
← All documents from this meeting