1 55452.01100\31193624.5
Attachment 2

CITY OF SAN CLEMENTE

PROFESSIONAL CONSULTANT SERVICES AGREEMENT

1. PARTIES AND DATE.

This Agreement is made and entered into this day of , 2023, by and between the City of San Clemente, a municipal corporation, organized under the laws of the State of California, with its principal place of business at 910 Calle Negocio, San Clemente, California, 92673 ("City") and UNIVERSAL CORROSION SERVICES, LLC, a California limited liability company, with its principal place of business at 10572 ACACIA STREET, SUITE C4 RANCHO CUCAMONGA, CA 91730 ("Consultant"). City and Consultant are sometimes individually referred to herein as "Party" and collectively as "Parties."

2. RECITALS.

2.1 Consultant.

Consultant desires to perform and assume responsibility for the provision of certain professional CORROSION PROTECTION ENGINEERING consulting services required by the City on the terms and conditions set forth in this Agreement. Consultant represents that it is experienced in providing professional CORROSION PROTECTION consulting services to public clients, is licensed in the State of California, if applicable, and is familiar with the plans of City.

2.2 Project.

City desires to engage Consultant to render such professional CORROSION PROTECTION consulting services for the ANNUAL CATHODIC PROTECTION SYSTEM TESTING AND EVALUATION project ("Project") as set forth in this Agreement.

3. TERMS.

3.1 Scope of Services and Term.

3.1.1 General Scope of Services. Consultant promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional Corrosion Protection Engineering consulting services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. The term of this Agreement shall be from JULY 1, 2023 to June 30, 2026, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines.
55452.01100\31193624.5 2

3.2 Responsibilities of Consultant.

3.2.1 Independent Contractor; Control and Payment of Subordinates. The Services shall be performed by Consultant or under its supervision. Consultant will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Consultant on an independent contractor basis and not as an employee.

Consultant retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Consultant shall also not be employees of City and shall at all times be under Consultant's exclusive direction and control. Neither City, nor any of its officials, officers, directors, employees or agents shall have control over the conduct of Consultant or any of Consultant's officers, employees, or agents, except as set forth in this Agreement. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance.

3.2.2 Schedule of Services. Consultant shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services set forth in Exhibit "B" attached hereto and incorporated herein by reference. Consultant represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Consultant's conformance with the Schedule, City shall respond to Consultant's submittals in a timely manner. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services.

3.2.3 Endorsement on PS&E/ Other Data. Consultant shall sign all plans, specifications, estimates (PS&E) and engineering data furnished by Consultant, and where appropriate will indicate Consultant’s authorized signature and professional registration number.

3.2.4 Conformance to Applicable Requirements. All work prepared by Consultant shall be subject to the approval of City.

3.2.5 Substitution of Key Personnel. Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City. The key personnel for performance of this Agreement are as follows: IAN BUDNER, PROJECT MANAGER.

3.2.6 City's Representative. The City hereby designates DAVID REBENSDORF, UTILITIES DIRECTOR, or his/her designee, to act as its representative in all matters pertaining to the administration and performance of this Agreement ("City's Representative"). City's Representative shall have the power to act on behalf of the City for review and approval of all products submitted by Consultant but not the authority to enlarge the Scope of Work or change the total compensation due to Consultant under this Agreement. 55452.01100\31193624.5
3 The City Manager shall be authorized to act on City's behalf and to execute all necessary documents which enlarge the Scope of Work or change the Consultant's total compensation subject to the provisions contained in Section 3.3 of this Agreement. Consultant shall not accept direction or orders from any person other than the City Manager, City's Representative or his/her designee.

3.2.7 Consultant's Representative. Consultant hereby designates IAN BUDNER, PROJECT MANAGER, or his/her designee, to act as its representative for the performance of this Agreement ("Consultant's Representative"). Consultant's Representative shall have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement. The Consultant's Representative shall supervise and direct the Services, using his/her best skill and attention, and shall be responsible for all means, methods, techniques, sequences, and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.

3.2.8 Coordination of Services. Consultant agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times.

3.2.9 Standard of Care; Performance of Employees. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants that all employees and subconsultants shall have sufficient skill and experience to perform the Services assigned to them. Finally, Consultant represents that it, its employees and subconsultants have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, and that such licenses and approvals shall be maintained throughout the term of this Agreement.

As provided for in the indemnification provisions of this Agreement, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant's failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub-consultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.

3.2.10 Laws and Regulations. Consultant shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with Services. If Consultant performs any work knowing it to be contrary to such laws, rules and regulations, Consultant shall be solely responsible for all costs arising therefrom. Consultant shall defend, indemnify and hold City, its officials, directors, officers, employees, agents, and volunteers free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.2.11 Safety. Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and 4 55452.01100\31193624.5
regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed.

Safety precautions, where applicable, shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subconsultants, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.2.12 Insurance. Consultant agrees to procure and maintain, at Consultant’s expense all insurance specified in Exhibit “C” attached hereto and by this reference incorporated herein. Consultant shall require all subconsultants to carry the same policies and limits of insurance that the Consultant is required to maintain, unless otherwise approved in writing by the City.

3.3 Fees and Payments.

3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "D" attached hereto and incorporated herein by reference. The total compensation shall not exceed TWO HUNDRED NINE THOUSAND EIGHT HUNDRED AND THIRTY EIGHT DOLLARS ($209,838) without written approval of the City Council or City Manager as applicable. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

3.3.2 Payment of Compensation. Consultant shall submit to City a monthly invoice which indicates work completed and hours of Services rendered by Consultant. The invoice shall describe the amount of Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the invoice.

City shall, within 30 days of receiving such invoice, review the invoice and pay all non-disputed and approved charges thereon. If the City disputes any of Consultant's fees, the City shall give written notice to Consultant within thirty (30) days of receipt of an invoice of any disputed fees set forth therein.

3.3.3 Reimbursement for Expenses. Consultant shall not be reimbursed for any expenses unless authorized in writing by City, or included in Exhibit "D" of this Agreement.

3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Consultant perform Extra Work. As used herein, "Extra Work" means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from the City.

3.3.5 Rate Increases. In the event that this Agreement is renewed pursuant to Section 3.1.2, the rate set forth in Exhibit “D” may be adjusted each year at the time of renewal as set forth in Exhibit “D.”

3.3.6 Labor Code Requirements.

3.3.6.1 Prevailing Wages. Consultant is aware of the requirements of 5 55452.01100\31193624.5
California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant's principal place of business and at the project site. Consultant shall defend, indemnify and hold the City, its officials, officers, employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

3.3.6.2 Registration. If the Services are being performed as part of an applicable “public works” or “maintenance” project, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, the Consultant and all subconsultants must be registered with the Department of Industrial Relations (“DIR”). Consultant shall maintain registration for the duration of the project and require the same of any subconsultants. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code sections 1725.5 and 1771.1 shall not apply to Services performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code sections 1725.5 and 1771.1.

3.4 Accounting Records.

3.4.1 Maintenance and Inspection. Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of four (4) years from the date of final payment under this Agreement.

3.5 General Provisions.

3.5.1 Termination of Agreement.

3.5.1.1 Grounds for Termination. City may, by written notice to Consultant, terminate the whole or any part of this Agreement at any time, with or without cause, by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Consultant shall be compensated only for those services which have been adequately rendered to City, and Consultant shall be entitled to no further compensation. Consultant may not terminate this Agreement except for cause.

3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such document and other information within fifteen (15) days of the request. 6 55452.01100\31193624.5

3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:

Consultant:

City:

Universal Corrosion Service, LLC
10572 Acacia Street, Suite C4
Rancho Cucamonga, CA 91730
ATTN: Ian Budner, Project Manager
City of San Clemente
380 Avenida Pico, Bldg. N
San Clemente, CA 92672
ATTN: JULIE SCHMIDT, MANAGEMENT

ANALYST II
7 Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Ownership of Materials and Confidentiality.

3.5.3.1 Documents & Data; Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subconsultants to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subconsultant prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data.

Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents & Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk.

3.5.3.2 Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents & Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services or the Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City.

3.5.3.3 Confidential Information. The City shall refrain from releasing Consultant’s proprietary information ("Proprietary Information") unless the City's legal counsel determines that the release of the Proprietary Information is required by the California Public Records Act or other applicable state or federal law, or order of a court of competent jurisdiction, in which case the City shall notify Consultant of its intention to release Proprietary Information.

Consultant shall have five (5) working days after receipt of the Release Notice to give City written notice of Consultant's objection to the City's release of Proprietary Information. Consultant shall indemnify, defend and hold harmless the City, and its officers, directors, employees, and agents from and against all liability, loss, cost or expense (including attorney’s fees) arising out of a legal action brought to compel the release of Proprietary Information. City shall not release the Proprietary Information after receipt of the Objection Notice unless either: (1) Consultant fails to fully indemnify, defend (with City's choice of legal counsel), and hold City harmless from any legal action brought to compel such release; and/or (2) a final and non- appealable order by a court of competent jurisdiction requires that City release such information.

3.5.4 Cooperation; Further Acts. The Parties shall fully cooperate with one 8 another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.5 Attorney's Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney's fees and all other costs of such action.

3.5.6 Indemnification.

3.5.6.1 To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its directors, officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant's Services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses.

Consultant’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.

3.5.6.2 If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance as a “design professional” (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.

3.5.7 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.8 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Orange County.

3.5.9 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.10 City's Right to Employ Other Consultants. City reserves right to employ other consultants in connection with this Project.

3.5.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.12 Assignment or Transfer. Consultant shall not assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, 9 hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.13 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subconsultants of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.

3.5.14 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.

3.5.16 No Third-Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.5.17 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.18 Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.19 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subconsultant, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of City's Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.20 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every 10 employer to be insured against liability for Worker's Compensation or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.21 Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.22 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.6 Subcontracting.

3.6.1 Prior Approval Required. Consultant shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.
11 55452.01100\31193624.5
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed on the respective dates set forth opposite of their signatures.

CITY OF SAN CLEMENTE
By:

Andy Hall, City Manager
ATTEST:

Dated: , 20
CITY CLERK of the City of
San Clemente, California
APPROVED AS TO FORM:

Elizabeth A. Mitchell, City Attorney

APPROVED AS TO AVAILABILITY
OF FUNDING:

Finance Authorization

UNIVERSAL CORROSION SERVICES, LLC
(“CONSULTANT”)
By:

Name:

Its: General Manager
Dated: , 20
EXHIBIT "A"
12 55452.01100\31193624.5

SCOPE OF SERVICES
Please see attached proposal from Universal Corrosion Services, LLC, which is incorporated fully herein by this reference.

EXHIBIT "B"
13 55452.01100\31193624.5

SCHEDULE OF SERVICES
Please see attached proposal from Universal Corrosion Services, LLC, which is incorporated fully herein by this reference.

EXHIBIT “C”
55452.01100\31193624.5 14

INSURANCE REQUIREMENTS

3.2.12 Insurance.

3.2.12.1 Time for Compliance. Consultant shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has provided evidence satisfactory to the City that the subconsultant has secured all insurance required under this section.

3.2.12.2 Types of Insurance Required. As a condition precedent to the effectiveness of this Agreement for work to be performed hereunder, and without limiting the indemnity provisions of the Agreement, the Consultant, in partial performance of its obligations under such Agreement, shall procure and maintain in full force and effect during the term of the Agreement the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Consultant agrees to amend, supplement or endorse the policies to do so.
(A) Commercial General Liability: Commercial General Liability Insurance which affords coverage at least as broad as Insurance Services Office "occurrence" form CG 0001, or the exact equivalent, with limits of not less than $1,000,000 per occurrence and no less than $2,000,000 in the general aggregate. Defense costs shall be paid in addition to the limits. The policy shall contain no endorsements or provisions (1) limiting coverage for contractual liability; (2) excluding coverage for claims or suits by one insured against another (cross-liability); or (3) containing any other exclusion(s) contrary to the terms or purposes of this Agreement. (B) Automobile Liability Insurance: Automobile Liability Insurance with coverage at least as broad as Insurance Services Office Form CA 0001 covering "Any Auto" (Symbol 1), or the exact equivalent, covering bodily injury and property damage for all activities with limits of not less than $1,000,000 combined limit for each occurrence. (C) Workers' Compensation: Workers' Compensation
Insurance, as required by the State of California and Employer's Liability Insurance with a limit of not less than $1,000,000 per accident for bodily injury and disease. (D) Professional Liability (Errors & Omissions): Professional Liability insurance or Errors & Omissions insurance appropriate to Consultant’s profession with limits of not less than $1,000,000 per claim. Covered professional services shall specifically include all work to be performed under the Agreement and delete any exclusions that may potentially affect the work to be performed (for example, any exclusions relating to lead, asbestos, pollution, testing, underground storage tanks, laboratory analysis, soil work, etc.). If coverage is written on a claims-made basis, the retroactive date shall precede the effective date of the initial Agreement and continuous coverage will be maintained or an extended reporting period will be exercised for a period of at least three (3) years from termination or expiration of this Agreement. 15 55452.01100\31193624.5

3.2.12.3 Insurance Endorsements. Required insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Commercial General Liability:
(1) Additional Insured: The City, its officials, officers, employees, agents, and volunteers shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement.

Additional Insured Endorsements shall not (1) be
restricted to "ongoing operations"; (2) exclude "contractual liability"; (3) restrict coverage to "sole" liability of Consultant; or (4) contain any other exclusions contrary to the terms or purposes of this Agreement. For all policies of Commercial General Liability insurance, Consultant shall provide endorsements in the form of ISO CG 20 10 10 01 (or endorsements providing the exact same coverage) to effectuate this requirement.
(2) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (B) Automobile Liability:
(1) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium.

3.2.12.4 Professional Liability (Errors & Omissions):
(A) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (B) Contractual Liability Exclusion Deleted: This insurance shall include contractual liability applicable to this Agreement. The policy must “pay on behalf of” the insured and include a provision establishing the insurer’s duty to defend.

3.2.12.5 Workers' Compensation:
(A) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium.

3.2.12.6 Primary and Non-Contributing Insurance. All policies of Commercial General Liability and Automobile Liability insurance shall be primary and any other insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents, or volunteers shall not contribute with this primary insurance. Policies shall contain or be endorsed to contain such provisions.

3.2.12.7 Waiver of Subrogation. All policies of Commercial General Liability and Automobile Liability insurance shall specifically allow Consultant or others providing 16 55452.01100\31193624.5
insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against the City, its officials, officers, employees, agents, and volunteers, and shall require similar written express waivers and insurance clauses from each of its subconsultants.

3.2.12.8 Deductibles and Self-Insured Retentions. Any deductible or selfinsured retention greater than $5,000 must be approved in writing by the City and shall protect the City, its officials, officers, employees, agents, and volunteers in the same manner and to the same extent as they would have been protected had the policy or policies not contained a deductible or self-insured retention.

3.2.12.9 Evidence of Insurance. The Consultant, concurrently with the execution of the Agreement, and as a condition precedent to the effectiveness thereof, shall deliver either certified copies of the required policies, or original certificates on forms approved by the City, together with all endorsements affecting each policy. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for approval. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15 days) prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the required coverage, Consultant shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies.

3.2.12.10 Failure to Maintain Coverage. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement effective upon notice.

3.2.12.11 Acceptability of Insurers. Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A- VII and authorized to transact business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.

3.2.12.12 Enforcement of Agreement Provisions (non estoppel).

Consultant acknowledges and agrees that actual or alleged failure on the part of the City to inform Consultant of non-compliance with any requirement imposes no additional obligation on the City nor does it waive any rights hereunder.

3.2.12.13 Requirements Not Limiting. Requirement of specific coverage or minimum limits contained in this Appendix are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance.

3.2.12.14 Insurance for Subconsultants. Consultant shall include all subconsultants engaged in any work for Consultant relating to this Agreement as additional 17 55452.01100\31193624.5
insureds under the Consultant's policies, or the Consultant shall be responsible for causing subconsultants to purchase the appropriate insurance in compliance with the terms of these Insurance Requirements, including adding the City, its officials, officers, employees, agents, and volunteers as additional insureds to the subconsultant's policies. All policies of Commercial General Liability insurance provided by Consultant’s subconsultants performing work relating to this Agreement shall be endorsed to name the City, its officials, officers, employees, agents and volunteers as additional insureds using endorsement form ISO CG 20 38 04 13 or an endorsement providing equivalent coverage. Consultant shall not allow any subconsultant to commence work on any subcontract relating to this Agreement until it has received satisfactory evidence of subconsultant’s compliance with all insurance requirements under this Agreement, to the extent applicable. The Consultant shall provide satisfactory evidence of compliance with this section upon request of the City.
18 55452.01100\31193624.5
EXHIBIT “D”

COMPENSATION
Compensation for the services provided under this Agreement shall be on a time and materials basis at the hourly rates listed in the attached proposal from Universal Corrosion Services, LLC, which is incorporated fully herein by this reference. Total compensation under this Agreement shall not exceed $209,838. Additional work shall require approval by the City Council. 19 55452.01100\31193624.5
WORKER’S COMPENSATION INSURANCE CERTIFICATION

WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
(ONE OF THE BOXES BELOW MUST BE CHECKED)
I have and will maintain a certificate of consent from the California Labor Commission to self-insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract.

I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract. My workers' compensation insurance carrier and policy number are:

Carrier
Policy Number
I certify that, in the performance of the work under this Agreement, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and I hereby agree to indemnify, defend, and hold harmless the City of San Clemente and all of its officials, employees, and agents from and against any and all claims, liabilities, and losses relating to personal injury or death, economic losses, and property damage arising out of my failure to provide such worker’s compensation insurance. I further agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.

WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION

COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO

CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.
20 55452.01100\31193624.5
Dated: , 20
Consultant
By:

Title
Address

REQUEST FOR PROPOSAL

ANNUAL CATHODIC PROTECTION SYSTEM,TESTING ,EVALUATION

AND DESIGN
PREPARED FOR:

UTILITIES DEPARTMENT
380 AVENIDA PICO,BLDG.N
SAN CLEMENTE, CA 92672
PREPARED BY:

UNIVERSAL CORROSION SERVICES, LLC
10572 ACACIA STREET,SUITE C4
RANCHO CUCAMONGA, CA 91730
UCORR PROPOSAL NO.COSCL-Q23-0101
February 2, 2023
www.ucorr.net Universal Corrosion Services, LLC Page i
February 2, 2023
Mr. Michael Fakhar, P.E.

Project Manager
City of San Clemente
Utilities Department
380 Avenida Pico, Bldg. N
San Clement, CA 92672
Re: Request for Proposal for the Annual Cathodic Protection System Testing, Evaluation and Design Project Thank you for the opportunity to submit the following comprehensive proposal to provide cathodic protection (CP) system testing, evaluation, and documentation services for the subject project. The proposal was prepared based on receipt/review Request for Proposal document, provided drawings and reports, and the sample Professional Services Agreement.

Universal Corrosion Services, LLC (Ucorr) is confident that it will offer the City of San Clemente the highest quality of CP field survey, evaluation, and reporting, as well as engineering and design services. Ucorr has enclosed the following documents in this comprehensive proposal package to fulfill the requirements of the subject RFP:
1) Project Background, Understanding, and Approach: Provides a general understanding of the City of San Clemente, its facilities and CP systems, the project requirements/objectives, and innovative technologies/patents developed to increase efficiency, quality, and sustainability, while decreasing cost and environmental impact.
2) Scope of Work: Provides a brief description of the sequential work tasks required to accomplish the project objectives, how much work will be completed on site, our technical approach, equipment and technologies utilized, submeter GPS data collection methods/procedures, type/quality of deliverables produced, and industry standards utilized for each project task. Also provides a brief description of our internal quality assurance/quality control (QA/QC) procedures and safety procedures. 3) Project Organization & Staffing: Provides a detailed description of the approach and methods for managing the project as well as the line of communication with the City. Provides an organization chart of all key personnel and their roles within the project. Also describes the responsibilities of all key personnel throughout the project execution and brief resumes including job/work experience, specific project experience related to the subject project, special skills, trainings, certifications, education, etc. 4) Related Experience: Provides a description of similar project experience directly related to this project’s scope of work and Ucorr’s qualifications in completing the subject project. Provides a detailed list of similar projects completed with references.
5) Project Schedule: Provides a detailed schedule including time-to-complete for each task and deliverables. 6) Cost Data: Provides a detailed cost breakdown of itemized tasks including labor categories and required labor hours of each team member for each task, as well the cost-to-complete each task at all project milestones.
7) Statement of Compliance: Statement of Compliance regarding the Request for Proposal document and the Draft Services Agreement.
8) Other Information: Provides Ucorr’s Class A and C10 Contractors License certificate, California Department of Industrial Relations (DIR) certification, as well as proof of insurance certificates for Ucorr’s Workers’ Compensation, Commercial General Liability, Professional Liability, and Commercial Auto Liability which meet or exceed the City’s requirements outline in the Draft Professional Services Agreement. www.ucorr.net Universal Corrosion Services, LLC Page ii As mentioned above, Ucorr possesses Class A – General Engineering and C10 – Electrical contractors classifications under License No. 1024943 to perform any construction/installation work related to corrosion monitoring and CP systems through its sister company, Ucorr Innovative Solutions, Inc.

Additionally, as mentioned above, Universal Corrosion Services, LLC possess all required insurance policies that meet and/or exceed the City’s coverage requirements to perform any type of work related to corrosion monitoring/control and CP for the City of San Clemente
Ucorr is also a registered small business holding small business certifications with the following entities. All related certification and vendor numbers are listed as evidence of certification.

1. California Department of General Services (DGS)/Cal eProcure Small Business (micro) Enterprise (Certification #1796394)

2. U.S. Small Business Administration (SBA) Small Business Concern (SBC) (SBC Control ID #SBC_00710829)
All proposed work will be performed on a time and materials basis not-to-exceed the proposed/negotiated contract price unless changes are approved in advance by a change order signed by the City of San Clemente.

This proposal is a firm offer and will be valid for 90 business days from the submittal due date.

We have reviewed the provided sample Professional Services Agreement, can meet the requirements of the agreement, and are willing to enter into an agreement with the City of San Clemente.

The project will be managed from Ucorr’s headquarters located in Rancho Cucamonga, CA. All contact information for this office location can be found below.

The undersigned will act as an Ucorr’s authorized agent to negotiate, represent, and contractually bind if Ucorr is selected as consultant by the City of San Clemente.

Sincerely,
Ian Budner
President/Senior Project Manager
Universal Corrosion Services, LLC (DBA: Ucorr)
10572 Acacia Street, Suite C4
Rancho Cucamonga, CA 91730
Mobile: 909-257-6301
Phone: 909-493-1350
Fax: 909-493-1380
Email: [email protected]
Ian Budner

TABLE OF CONTENTS
www.ucorr.net Universal Corrosion Services, LLC Page iii PROJECT BACKGROUND,UNDERSTANDING, AND APPROACH ............................................................................1 SCOPE OF WORK....................................................................................................................................4 PROJECT ORGANIZATION AND STAFFING....................................................................................................14 RELATED EXPERIENCE ............................................................................................................................24 PROJECT SCHEDULE ..............................................................................................................................33 COST DATA.........................................................................................................................................34 STATEMENT OF COMPLIANCE ..................................................................................................................36 OTHER INFORMATION (CONTRACTORS LICENSE, DIR CERTIFICATION,&INSURANCE PROOFS) ................................37

PROJECT BACKGROUND,UNDERSTANDING, AND APPROACH
www.ucorr.net Universal Corrosion Services, LLC Page 1
Project Understanding
Ucorr understands that the City of San Clemente owns, maintains, and operates a collection of reservoirs, pipelines, pump stations, and a pier. Many of these facilities are protected utilizing both sacrificial (passive) and impressed current cathodic protection (ICCP) systems as old as 25 years old. Based on our detailed review of all provided information, drawings, data and reports as well as previous City of San Clemente annual cathodic protection system field testing/observations and data analysis between 2019 and 2021, we understand the following:
x Pipelines
The City’s pipeline systems are comprised of various materials including, but not limited to, ductile iron, PVC, and welded cement mortar lined and coated (CMLC) steel. o Ductile Iron: A large portion of the pipeline systems included within this scope of work are constructed of ductile cast iron material and are protected utilizing ICCP systems. The electrical pipeline continuity required for effective CP system performance has been established utilizing continuity bond wires. Various bond wires including #2 and #6 HMWPE are utilized depending on the pipeline diameter and design requirements. Electrical access (test stations) are installed along the pipeline alignments to monitor the effectiveness of the CP systems. Additionally, there are ductile iron pipeline sections protected utilizing sacrificial CP systems (magnesium and/or zinc anodes).
o Welded Steel: There are pipeline sections including blow-offs, air vacs, and other small sections constructed of welded CMLC steel. In general, there will be no electrical continuity concerns for this type of piping as welded joints inherently create electrical continuity. Additionally, after reviewing the provided drawings, it is not clear if CMLC branches (blow-offs, air vacs, etc.) are electrically continuous with ductile iron mains or electrically isolated. o Pipeline Appurtenances: There are metallic valves, fittings, and other appurtenances installed within PVC and ductile iron pipeline sections that are receiving protection utilizing sacrificial CP systems.
o PVC: Portions of the City’s pipeline systems are constructed of PVC piping. CP systems are not installed on these sections as corrosion is not a concern for PVC. However, as mentioned above, there are sacrificial CP systems installed on metallic fittings, appurtenances, laterals, etc. located within PVC piping sections.
o Steel Casings: There are steel casing locations protected utilized sacrificial CP systems (magnesium anodes).

In accordance with the subject RFP, the following seven pipelines included in the scope of work have 11 rectifiers, 92 monitoring test stations, and 18 sacrificial anode test station.

1. 30” Land Outfall

2. Pico Reclaimed Water

3. La Pata Potable Water

4. Vista Hermosa Reclaimed Water

5. Vista Hermosa Potable Water

6. Marblehead Reclaimed Water Expansion

7. Force Main (Associated with Force Main Pump Station) x Reservoirs
Ucorr understands that the City of San Clemente owns/operates several reservoirs. According to our review of the provided RFP, drawings, data, and reports, as well as previous survey work completed, Ucorr understands that the following two reservoirs included in the scope of work are equipped with two ICCP systems each, one for protection of the internal submerged surfaces and one for protection of the external tank bottoms and associated buried piping.

1. Reservoir No. 4

2. Reservoir No. 8

PROJECT BACKGROUND,UNDERSTANDING, AND APPROACH
www.ucorr.net Universal Corrosion Services, LLC Page 2
The external CP monitoring system has been designed to evaluate the effectiveness of the CP system for the tank bottoms through embedded reference electrodes installed at various locations underneath the tank.
x Pump Stations
Piping located within pump stations are either receiving protection from sacrificial CP systems or ICCP systems. A vital component of protecting pump station facilities is ensuring proper isolation of pump station facilities, such as pumps, from buried inlet and outlet piping. Additional information regarding evaluation of electrical isolation can be found in the “Scope of Work” section of this proposal. There are a total of 4 test stations/test points and additional facility piping/risers associated with the following pump stations included in the scope of work:

1. Force Main Pump Station

2. Schlegel Pump Station

3. B-3 Pump Station
x Pier
Ucorr understands that the exposed steel piling installed at City of San Clemente’s recreational pier are being protected utilizing a combination of a sacrificial aluminum bracelet anodes and an ICCP system comprised of one rectifier and one MMO anode. Additional information regarding evaluation of the pier’s ICCP system can be found enclosed within the “Scope of Work” and “Related Experience” sections of this proposal.

Project Objectives
Ucorr understands the objectives of this project are:
x Evaluate the effectiveness of CP systems installed on the City’s pipelines, reservoirs, pump stations, and pier.
x Adjust the CP system as necessary to maintain acceptable levels of protection, with the approval of the Utilities Director.
x Identify any shortcomings related to the existing CP systems and facilities including:
o Rectifier faults
o Non-functional impressed current and sacrificial anodes o Electrical discontinuities
o Deficiencies on CP monitoring systems such as damaged test leads, test stations, embedded reference electrodes, and wiring issues
o Ineffective isolation devices
o AC and DC stray current locations and sources
x Provide annual report including recommendations/budgetary cost estimates for remediating shortcomings identified above.
x Collect submeter GPS coordinates and data for all CP system devices installed on the subject pipelines, reservoirs, pump stations, and pier and populate all data/coordinates into the City’s geodatabase for integration in their Graphical Information Systems (GIS) platform. A detailed description of GPS/data collection methods and procedures can be found in the “Scope of Work” section of this proposal package. x Provide required investigations for design efforts and develop design packages for the following Priority I Recommendations listed in the 2021 Annual Survey Report:
o Vista Hermosa 16” Reclaimed Water and 16” Domestic Water North of Bridge Crossing. o Reservoir 8
o Pier
o Marblehead Test Point 8-MHC1-R-TS05

PROJECT BACKGROUND,UNDERSTANDING, AND APPROACH
www.ucorr.net Universal Corrosion Services, LLC Page 3
Ucorr is always working to improve its QA/QC programs and safety programs through collective experience with a variety of clients and work environments. By creating dynamic and constantly improving programs, Ucorr ensures that its services are provided in a very timely and high-quality manner. Ucorr always ensures its services are provided in the highest manner of safety for our clients and staff while eliminating all negative impacts that the services may have on the environment. Ucorr completely believes in the principals of sustainable development and is fully committed to design, maintain, and construct sustainable services within the range of our activities.

All key personnel have been involved in several teaming experiences in projects similar to this solicitation through Ucorr and through previous employments. The technical background and qualifications of our project team are explained in detail in the “Project Organization & Staffing” and “Related Experience” sections of this proposal package.

Ucorr will firmly adhere to the following initiatives to improve quality in all aspects of the project:
x All equipment will be calibrated in accordance with the manufacturer’s standards. x All project personnel are technically certified through NACE and/or Operator Qualification (OQ) programs, which are described in detail in the “Scope of Work” section of this proposal. x Staff meetings, client meetings will be held bi-weekly to discuss the possible difficulties and improve the quality of all deliverables and monthly reports.

Ucorr completely believes in the principals of sustainable development and is fully committed to design, maintain, and construct sustainable services within the range of our activities.

Integral elements of sustainability are research and innovation activities. A telling example is the European environmental research and innovation policy. It aims at defining and implementing a transformative agenda to greening the economy and the society as a whole so to make them sustainable. Research and innovation in Europe are financially supported by the programme Horizon 2020, which is also open to participation worldwide.

Ucorr operates based on its innovations. We always approach new projects with the attitude that there are more environmentally friendly, more efficient, and more economical ways to complete each task than the existing methods that have been utilized in the industry for many years. The evidence of our approach is our intellectual properties:
x Multipurpose Segmented Titanium MMO Coated Impressed Current Anodes, 2010 (US Patent #8821698) x Multipurpose Segmented Sacrificial Anodes, 2010 (US Patent #8828195) x Embedded AC Mitigation System, 2015 (US Patent #9774105) x Automated Tank Cathodic Protection Monitoring System, 2015 (US Patent #10018864) x High Efficiency Cast Iron Anode, 2020 (US Patent #10577697) x Marine Utility Cast Iron Anode, 2019 (US Patent #10428430) x Modified Rectangular Wave Polarization Control System, 2022 (US Patent Publication #20220397459) We always utilize innovative methods in our activities to ensure we make the best use of our resources, have less impact on the environment, and minimize safety concerns for our community.

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 4
This section provides a detailed description of the sequential work tasks required to accomplish the project objectives, the type and quality of deliverables, the technologies and approach utilized for each task, and the related industry standards utilized.

To ensure the highest quality of professional engineering services, we understand that our assigned project personnel should review all available alignment sheets, drawings, historical data/reports, and all other available/pertinent documents to become completely familiar with each of the existing pipelines, reservoirs, pump stations, pier and any other associated facilities included in the City’s corrosion control/cathodic protection program.

All survey data will be logged/recorded, including collection of submeter GPS coordinates at all testing locations/facilities, and the annual reports and geodatabase will be updated to exhibit the existing condition of each facility, including recommendations for CP facility repairs and improvements. As Ucorr’s project team completed the City’s Cathodic Protection System Annual Survey between 2019 and 2021, we are completely familiar with all City facilities, CP systems, testing locations/requirements, and access issues, as well as the CP system geodatabase. The same key project team members will be utilized for the duration of the upcoming survey/design contract to improve the quality of field testing/deliverables and save time/budget.

Review of all drawings, CP system as-builts, specifications, and other pertinent information related to the Priority I recommended design efforts as well as preliminary design site investigations including site reconnaissance, constructability reviews, soil resistivity measurements, and other necessary site investigation efforts will be performed. All findings, testing results, and observations from the above-mentioned review/site investigations will be utilized to prepare design packages for the four items requiring design based on the 2021 Annual CP System Survey Report Priority I recommendations.

Following, we have outlined our understanding of the scope of services in accordance with the subject RFP.

Task 1: Data Review and Analysis
x Review of the following available recorded information for all facilities included in, and to be included in the corrosion control program:
o Pipeline and facility design drawings and specifications. o Cathodic protection system drawings and specifications. o Previous CP system survey reports and historical testing data. o Existing soil corrosivity and geotechnical data and reports. o Previously generated CP system geodatabases.
o Any other pertinent, available information related to the CP systems and subject City facilities. x Prepare a detailed project schedule. The detailed schedule shall include accurate time required for each task and dependency to any preceding tasks and subtasks. The detailed schedule will be submitted to the City for approval within two weeks of receiving the Notice-to-Proceed. The project schedule will be updated and resubmitted monthly reflecting all project progress. A preliminary project schedule has been included in this Proposal Package based on assumed start dates.
x Hold a kickoff meeting with City personnel to discuss the project safety concerns, project schedule, and field survey objectives and logistics.

Note: Project status updates including project progress/accomplishments, budgetary summary of each project task, significant issues/concerns, outstanding action items, and planned activities for the upcoming month will be prepared and submitted on a monthly basis with each monthly invoice.

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 5
Task 2: Field Survey and Testing
x Perform the CP system survey. A detailed description of all survey test procedures and testing equipment can be found below.
x Review, verify and populate the City’s existing geodatabase attribute fields for all survey/inspection work conducted.
x Perform necessary adjustments to CP system facilities based on analysis of initial CP survey data. x Re-survey all CP system facilities to measure the effectiveness of the adjustments made. Additional adjustments/survey work can be performed if inadequate results are observed.

During each task, the progress and quality of completed work will be checked daily by the project manager, project engineers, and QA/QC coordinator to ensure that Ucorr is meeting all project milestones for each task within the allotted time and budget. The quality of field data and accuracy of design work will be also checked daily by the appropriate personnel and shall be approved by the project manager, QA/QC coordinator, and project engineers. If any collected data looks faulty due to improper equipment calibration or any other possible errors, Ucorr will redo/correct the task at its own expense.

All field crew members are qualified through operator qualification (OQ) programs including Veriforce, NACE/AMPP, Operator Qualification Solutions Group (OQSG), and National Center for Construction Education and Research (NCCER) to perform the corrosion protection/cathodic protection related tasks with the safest and highest quality possible in accordance with the existing applicable standards.

Ucorr values safety above all other aspects of any project. We have implemented necessary safety programs and our crews have completed all required safety trainings to work in hazardous environments. Ucorr has also implemented a drug and alcohol/background check monitoring program with ASAP/OSCA to ensure that our personnel abide by the requirements of the Code of Federal Regulations to work in hazardous environments. The project team will hold weekly safety meetings to discuss all potential safety issues/hazards of the project and develop safeguards to minimize the chance of incidents occurring.

Following is a detailed description of all relevant testing procedures, industry standards, and utilized equipment for all field survey and testing tasks.

VISUAL INSPECTION, SUBMETER GPS COORDINATES, AND PHOTO-DOCUMENTATION Visual inspection will be performed on all accessible CP system/corrosion monitoring system components and associated facilities for signs of damage, degradation, or non-functioning components. All data collected will be tied with a time/date-stamp and latitude/longitude submeter GPS coordinate utilizing the NAD83 coordinate system.

Submeter GPS data will be obtained utilizing a Juniper Geode GNS2 Multi-GNSS Submeter GPS Receiver. Figure 1 displays a typical submeter GPS coordinate being collected at a field testing site utilizing the Juniper Geode GNS2 Multi-GNSS Submeter GPS Receiver.

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 6
Figure 1 – Typical Submeter GPS Coordinate Collection Utilizing Juniper Submeter GPS Receiver Additionally, Ucorr will document all tested CP facilities and structures with geo-tagged photos demonstrating the as-found and as-left conditions of the facilities.

RECTIFIER TESTING
¾ APPLICABLE INDUSTRY STANDARDS/TEST METHODS: NACE SP0169, NACE CP 3 MANUAL –SECTION 5

TECHNICAL APPROACH &TECHNOLOGY
Ucorr will perform rectifier inspection, measurements, adjustments, troubleshooting, and maintenance to confirm proper operation of the City’s rectifiers.

Rectifiers are one of the main components in an ICCP system. Operational issues surrounding rectifiers can lead to numerous CP systems issues including a decline in the driving voltage resulting in a decrease in current and structure polarization. Ucorr will inspect all rectifiers per industry standards/regulations as they are vulnerable and vital components of a CP system. Ucorr will visually and operationally inspect the rectifiers for any sign of arcing, strange odor, loose connections, leaks, failed circuit breaker, lightning arrester, and other parts as well. Ucorr will also ensure all inspections are performed with the highest safety standards to ensure no damage is caused to the rectifiers and no harm is caused to the inspector. Ucorr will ensure all required permitting, qualifications/certifications, operator qualification training, lock-out/tag-out, and any other safety requirements are met prior to performing any inspections.

During each inspection, rectifier DC amps & voltage measurements will be collected utilizing a calibrated Fluke Digital Multimeter. In many cases, internal voltmeters and amp/voltage displays are not functioning properly and cannot be relied on for accurate rectifier outputs. For this reason, Ucorr always ensures that it measures the DC amp and voltage outputs through the rectifier output terminals and shunts and compares them against the display meters installed on the rectifiers. By collecting both sets of current/voltage outputs Ucorr can determine the proper DC current/voltage outputs and diagnose if there are any issues with the embedded meters.

POTENTIAL (VOLTAGE) MEASUREMENTS FOR TEST STATIONS AND OTHER FACILITIES ¾ APPLICABLE INDUSTRY STANDARDS/TEST METHODS: NACE SP0169, NACE TM0497, CP 2 MANUAL –SECTION 6

TECHNICAL APPROACH &TECHNOLOGY
Structure-to-Electrolyte Voltage Measurements AC & DC
All AC & DC structure-to-electrolyte voltage measurements will be collected at all test stations, casings, risers, etc. utilizing a calibrated Fluke (Digital Multimeter) or CorrReader GPS Synchronized Test Station Reader with respect to a calibrated, saturated Copper/Copper Sulfate (CSE) reference electrode.

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 7
One major benefit of the CorrReader is that it is equipped with a GPS receiver. This enables Ucorr to electronically log AC/DC voltage measurements, GPS data, and general comments simultaneously increasing the speed and quality of the data collection. Additionally, the CorrReader generates Excel spreadsheets of all stored information, which increases the speed, quality, and accuracy of the data analysis/tabulation and provides increased efficiency for translating all data into to the City’s geodatabase.

Voltage Profile Measurements for the Pier
Ucorr will perform a steel pile potential survey including voltage profiles on per depth on select piles utilizing a CorrReader with respect to a saturated Silver/Silver Chloride reference electrode. Silver/Silver Chloride reference electrodes are the optimal reference electrodes when collecting potential measurements in sea water as it is saturated with a chloride solution and will not be contaminated by the high concentrations of chlorides in sea water.

Interrupted Voltage Measurements
Since historical baseline (depolarized) potential data is available for the City’s subject facilities (test stations, reservoirs, etc.), Ucorr will perform interrupted potential surveys to determine if the facilities are properly protected with respect to the NACE/AMPP 100 mV polarization shift criterion. In these conditions, Ucorr utilizes Cath-Tech GPS Synchronized Current Interrupters to obtain IR-free potential readings of buried/submerged structures. Cath-Tech interrupters utilize electronic switches instead of relays which decreases the possibility of false readings exactly at the time of the “instant-off” reading. For CP systems with multiple current sources, Ucorr’s current interrupters come equipped with GPS receivers and can be instantaneously synchronized with each other through satellite feeds received through the GPS receivers to achieve synchronized interruption. Current interruption is utilized to obtain “On” and “Instant-Off” (IR free) readings. IR free readings are devoid of voltage drop and represent the true polarized potentials of the structure which are necessary to determine the level of protection as described in NACE/AMPP Standard SP0169.

Due to the nature of the electronics within the pulse rectifier assemblies installed on several City pipelines, conventional current interrupters cannot be utilized to properly interrupt the CP systems. However, Ucorr developed customized relays during previous annual survey which will be installed in conjunction with the GPS-synchronized current interrupters to properly interrupt the pulse rectifier assemblies and properly collect Instant-Off potential measurements. Figure 2 displays a typical pulse rectifier interrupter/relay setup (left) and a typical switchmode rectifier interrupter setup (right).

Figure 2 - Pulse Rectifier Interrupter/Relay Setup (left) and Switchmode Rectifier Interrupter Setup (right) Ucorr collects interrupted voltage measurements utilizing a CorrReader GPS Synchronized Test Station Reader/Data Logger. The interruption pattern of the CorrReader can be set to match that of the current interrupters to accurately measure “On” and “Instant-Off” potential measurements. GPS data is logged at each potential measurement

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 8
location as well. Additionally, submeter GPS coordinates will be collected at each measurement location utilizing Juniper Geode GNS2 Multi-GNSS Submeter GPS Receiver as displayed in Figure 1 above. Figure 3 displays the Cath-Tech GPS Synchronized Current Interrupter as well as CorrReader Test Station Reader.

Figure 3 – Typical Cath-Tech GPS-Synchronized Current Interrupter Setup (Left) and CorrReader TS Reader Setup (right)

CURRENT MEASUREMENTS
¾ APPLICABLE INDUSTRY STANDARDS/TEST METHODS: NACE SP0169, NACE CP 3 MANUAL –SECTION 5

TECHNICAL APPROACH &TECHNOLOGY
Anode Current Output Testing
Ucorr utilizes both direct and indirect methods for measuring anode current outputs. Ucorr collects direct anode current outputs utilizing shunts installed within the anode circuit and measuring the voltage drop across the shunt of known resistance. With this information, Ucorr can accurately calculate anode current outputs. Ucorr utilizes a calibrated Fluke Digital Multimeter for measuring shunt voltages to calculate anode current output. Ucorr also utilizes a General Technologies CM100 AC/DC Clamp Meter for indirect current measurements when shunts are not available or when shunts cannot be installed into the anode circuits, such as in the case of direct-connect anodes.

Figure 4 displays typical anode current output measurements via the direct method (left) and indirect method (right).

Figure 4 – Direct Anode Current Measurement (left) and Indirect Anode Current Measurement (right)

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 9
Inductive Ammeter Precision DC Current Testing
Inductive Ammeter DC Current testing is useful for precisely measuring DC current magnitude and flow direction at any location on large-diameter conductors (pipelines). Figure 5 displays the Swain Inductive Ammeter utilized for DC current testing.

Figure 5 – Swain Inductive Ammeter Current Measurement System The Swain inductive ammeter is portable and can be utilized at any location along exposed pipelines or other facilities. Test leads, risers, or any other electrical access is not required to collect DC current data utilizing the Swain technology. It can accurately and efficiently pinpoint DC stray current pickup/discharge locations as well as measure the magnitude of CP current at any location on a protected structure. Another benefit of inductive ammeter testing is that it can measure current magnitude/direction on pipelines as small as ¾” an as large as 100” in diameter.

Additionally, inductive ammeter testing utilized the swain meter can be utilized by determining the effectiveness of isolation device on small to large diameter pipelines. Swain inductive ammeters can also be utilized to perform precision resistance measurements by circulating current.

ELECTRICAL CONTINUITY AND STRAY CURRENT TESTING (TROUBLESHOOTING) ¾ APPLICABLE INDUSTRY STANDARDS/TEST METHODS: NACE TM0497

TECHNICAL APPROACH &TECHNOLOGY
Current Interruption Method
If electrical discontinuities are discovered during Phase 1 of the annual survey, Ucorr will utilize the following method to locate electrical discontinuities during future phases of the project, based on the City’s request. Ucorr utilizes the Current Interruption Method to quickly and effectively confirm the electrical continuity of the subject structures.

This method is conducted by applying an interrupted current with a known “on”/“off” cycle time to the subject pipeline. Voltage measurements are then collected along the subject pipeline at available test stations or other test points to confirm the same “on”/“off” time signature. If the same time signature is observed by means of voltage measurements, Ucorr can conclude the span of pipeline/structure between the current injection point and measurement location are electrically continuous. It should be noted that this method cannot precisely locate electrical discontinuities, but can quickly and accurately locate electrically continuous/discontinuous spans.

Additional testing, for example by the Circulating Current Method, is required for precise electrical discontinuity locating.

This method can also help to identify locations that may have stray current interference. Potential readings that are out of the expected range or significantly different from historical data could be signs of stray current interference.

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 10 Potentials and “on”/”off” time signatures can be analyzed to determine if stray current is present or if the CP system is not working as intended.

Pipeline Current Mapping (PCM) Method
Where required Ucorr can also utilize the pipeline current mapping method utilizing a Vivax Metrotech vLocDM2 Pipeline Defect Mapper equipped with a Juniper Submeter GPS Receiver to pinpoint electrical discontinuities.

Additionally, pipeline current mapping surveys are utilized to pinpoint current pick up/drop off locations where stray current is suspected or high voltage attenuation is observed. Figure 6 displays the Defect Mapper System utilized by Ucorr.

Figure 6 - Vivax Metrotech vLocDM2 Current Mapper Equipped with Juniper Submeter GPS Antenna

ISOLATION DEVICE TESTING
¾ APPLICABLE INDUSTRY STANDARDS/TEST METHODS: NACE SP0286

TECHNICAL APPROACH &TECHNOLOGY
Voltage Measurements
NACE Standard SP0286 describes the need for electrical isolation, methods of electrical isolation, comparison of devices available for pipeline isolation, and equipment specification and installation, as well as field testing and maintenance. One common method utilized by Ucorr for assessing the effectiveness of an above-ground or buried electrical insulating device is by measuring pipe-to-soil potentials on each side of the insulating device or by measuring the IR drop across the insulator. If a significant potential difference is seen across the insulator, it can be considered functional. In some cases, it is not apparent if the insulating device is functioning properly based simply on potential differences. Ucorr can also determine the functionality of the insulating device by interrupting the CP current on one side of the insulator and measuring the “on” and “instant-off” potentials on both sides of the device.

If CP is not installed on either side of the device, Ucorr can inject an interrupted DC voltage onto one side of the device and measured “on” and “instant-off” potentials on each side of the insulator. If potential shifts are only seen on the interrupted side of the insulator or if the magnitude of the potential measurements or potential shifts on each side of the insulator are significantly different, it can be deemed to be functioning properly.

High Frequency Method
Ucorr utilizes a MC Miller Gas Electronics Model 601 Insulation Checker to test above ground pipeline insulators very quickly and accurately. This device employs a radio frequency to determine if there are electrical shorts. One major benefit of this technology is that Ucorr can distinguish between a short within an insulating device or a short caused by interconnected piping. Additionally, Ucorr can determine if a bolt, is causing an electrical short or if there is a

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 11 short through the flange/gasket interface. By being able to precisely indicate the cause of the short, Ucorr can save the City time and money when performing repairs on insulating devices. Figure 7 displays Ucorr’s Gas Electronics Model 601 Insulation Checker.

Figure 7 - Model 601 Insulation Checker

ALTERNATING/DIRECT STRAY CURRENT (INTERFERENCE) TESTING ¾ APPLICABLE INDUSTRY STANDARDS/TEST METHODS: NACE SP0177, CP 3 MANUAL –SECTION 3

TECHNICAL APPROACH/PLAN &TECHNOLOGY
AC Interference Testing
All possible AC interference scenarios will be evaluated and tested using appropriate NACE/AMPP-approved potential measurement methods by Ucorr’s trained personnel. AC potential measurements will be measured at all test stations, risers, casings, etc. concurrently with DC potentials utilizing a CorrReader Test Station Reader to identify possible AC interference issues.

DC Interference Testing
Static DC interference is often caused by neighboring foreign cathodic protection systems. A thorough review of all collected DC potential data in the vicinity of known foreign CP system facilities will be conducted to identify potential DC interference sources and locations. If DC interference sources are identified, Ucorr will utilize a CorTalk uDL1 potential data loggers which logs AC and DC potential changes over time to study/monitor DC static interference.

Figure 8 displays a typical CorTalk uDL1 data loggers installation.

Figure 8 – Typical CorrTalk uDL1 Micro Data Logger Installation

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 12 Interference studies can also be conducted in conjunction with neighboring foreign CP system owners to determine the exact sources of interfering current, interfering current pickup and discharge locations, and the measures that need to be taken to mitigate static interferences issues. Pipeline current mapping utilizing the Metrotech vLocDM2 defect mapper system will also be utilized to locate current pickup and discharge locations.

In order to evaluate and test dynamic interference produced by AC/DC transit systems or other high voltage DC systems (e.g. welding equipment or high voltage DC transmission systems) that are variable in loading nature, Ucorr performs and records structure-to-soil AC/DC potential measurements in affected crossings versus time utilizing data loggers based on NACE/AMPP practices.

Task 3: Cathodic Protection System Testing and Evaluation Report Preparation x Prepare a preliminary report including:
o Description of all field testing and inspection procedures utilized. o Tabulation and analysis of all field-testing data.
o Introduction and description of each pipeline and facility tested and the type of CP system or corrosion monitoring system associated with each.
o Summary of all adjustments made during the initial testing and re-testing. o A complete analysis/explanation of all data and findings o Tabular summary of all damaged or missing test stations. o Color-coded test station data sheets showing all test stations (top view, general site view, and map view) identified by pipeline and test station number and site/detailed photos (one sheet per test station). These individual test station data sheets will also include GPS coordinates and comments specific to each site.
o Evaluation and assessment of operational condition of each pipeline CP system based upon the new and existing data, including the identification of any potential problem areas/locations where possible DC stray current interference sources exist with location(s) identified. o Conclusions regarding the as-found and as-left conditions of all tested facilities, operational status of the test stations and corrosion control systems of each facility, and locations where adequate levels of cathodic protection are not being achieved.
o Prioritized recommendations for cathodic protection system or corrosion monitoring system repairs, replacements, and/or upgrades.
o Preparation of cost estimates in accordance with the prioritized recommendations. o Recommended future cathodic protection system and corrosion monitoring system operation and maintenance procedures and frequency.
o Recommendations for work action items, including system operation and maintenance procedures.
o Arrange meetings to present/discuss report conclusions and recommendations. x Update the geodatabase with recorded GPS coordinates and all survey attributes. x Submit the preliminary report and geodatabase to the City of San Clemente for review. x Incorporate the City’s review comments into the Final Report and Geodatabase. x Prepare a prioritized cost estimate for recommended repairs, replacements, and improvements.

Note: Deliverables will include a Final Report including all information detailed above, an updated geodatabase, and a prioritized cost estimate.

SCOPE OF WORK
www.ucorr.net Universal Corrosion Services, LLC Page 13 Task 4: Cathodic Protection System Improvement Designs & Investigations x Perform a site investigation to update design data.
x Prepare initial design packages including design calculations, bill of materials, site/location drawings, wiring schematic drawings, and installation/details drawings for the priority I recommended improvement items from the 2021 Annual Cathodic Protection System Survey Report:
o Reservoir 8 – Design Replacement internal CP system to enable proper adjustment/balance for both internal and external surfaces of the reservoir.
o Pier – Design a CP system utilizing the previously acquired Switchmode rectifier and sled anode(s) to protect all pier steel piles.
o Marblehead Pipeline – Design a new anode groundbed to reach adequate levels of protection for the affected section of pipeline.
o Vista Hermosa – Design a new sacrificial CP system for the portion of line that appears to be discontinuous according to the Year 1 CP system deficiencies investigation report. x Arrange a meeting(s) to present/discuss the preliminary design packages. x Incorporate the City’s review comments into the final design packages.

All data/reports will be thoroughly reviewed by Ucorr’s QA/QC engineer to ensure compliance with the City’s requirements.

Ucorr is well-versed with all applicable standards, latest technologies, and requirements related to this solicitation’s scope of work. All required field testing, analysis, and possible CP system design work will be completed per the following standards:
x NACE/AMPP SP0169: Control of External Corrosion on Underground or Submerged Metallic Piping Systems
x NACE/AMPP SP0100: Cathodic Protection to Control External Corrosion of Concrete Pressure Pipelines and Mortar-Coated Steel Pipelines for Water or Wastewater Service x NACE/AMPP TM0497: Measurement Techniques Related to Criteria for Cathodic Protection on Underground or Submerged Metallic Piping Systems
x NACE/AMPP SP0193: External Cathodic Protection of On-Grade Carbon Steel Storage Tank Bottoms x NACE/AMPP Cathodic Protection Manuals: Levels 1 through 4

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 14 As Ucorr’s project team completed the City’s Cathodic Protection System Annual Survey between 2019 and 2021, we are completely familiar with all City facilities, CP systems, testing locations/requirements, and access issues, as well as the CP system geodatabase. The same key project team members will be utilized for the duration of the upcoming survey/design contract to improve the quality of field testing/deliverables and save time/budget.

Ucorr’s goal is always to provide the highest quality services to our clients. Since the beginning of its operations, Ucorr has successfully completed all projects within the allotted time and budget for each service provided to our clients. We are willing to modify the project schedule to meet the project goals and budget. The main factor in Ucorr’s approach is ensuring that we understand the exact target of each task to efficiently and successfully complete the task. Ucorr’s project manager will carefully review the project requirements to fully understand the project goals and their environmental/safety concerns.

Ucorr’s point of contact/project manager will discuss the project in detail with the City to ensure there is a mutual understanding of task goals. The project will also be discussed with the assigned project engineers to evaluate the resources needed throughout the project. A detailed project schedule will be updated based on communications with City personnel, internal discussions with assigned project personnel, and past experience with required time allotment from the City’s 2019 through 2021 surveys. Required manpower, equipment, and vehicles for each task will be allocated and a detailed technical task procedure list for the field crew members will be prepared. The field crew lead will prepare all safety requirements for each task and ensure that all necessary equipment is in a safe, working, and calibrated condition.

The project progress vs. budget will be updated on a monthly basis and reported alongside the monthly invoices to the City of San Clemente as outlined in Section 3.3 of the Draft Professional Services Agreement. Weekly survey progress updates will be communicated with the City.

Ucorr will firmly adhere to the following initiatives throughout the project:

1. All project members will be completely familiar with the project and its goals.

2. The detailed project schedule and budget will be designed to dedicate required resources available to fulfill required tasks prior to deadlines.

3. Safety of field personnel is our primary goal during all field survey work.

4. Quality/accuracy of measurements and data integration.

5. Bi-weekly meetings will be held with the project team to discuss project progress, issues/difficulties, and incidents, if any, to ensure efficient and safe project execution.

6. Project manager will prepare weekly survey updates for the City.

7. Any deviation from the approved project schedule will be reported immediately to the City’s project manager or designated contact.

8. All daily activities will be communicated with the City’s project manager or designated contact.

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 15 The following Organization Chart represents Ucorr’s personnel that will be assigned to the Annual Cathodic Protection System Testing, Evaluation, and Design Project for the City:

Field Services /
Construction Management
Ian Budner
B.Sc., E.I.T., CP-2
Project Manager,
Point of Contact
Siamak Azimie
B.Sc., P.E.

QA/QC Engineer,
Design Review
Christie Curran
M.Sc.

Administrative
Manager
Omidreza Moghbeli
M.Sc., P.Eng., CP-3
Senior Corrosion
Engineer, Design
Carlos Pacheco
B.Sc., CP-2
Corrosion
Engineer
Dominik Borucki
OQ Certified
Corrosion
Technician
Sebastian Borucki
CP-1, CIP-1
Field Foreman
Daniel Arizmendi
OQ Certified
Corrosion
Technician
Carlos Pacheco
B.Sc., CP-2
Corrosion Eng.,
Drafting
Administrative
Services
Engineering/Design g/
Services

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 16 Ucorr will be able to meet the City’s requirements and complete all requested tasks with the highest industry standards. All key personnel were involved in the previous City of San Clemente Annual CP System Evaluation Contract as well as other similar projects. Additionally, all field personnel are Operator Qualification (OQ) certified (Abnormal Operating Conditions – AOC, and all required field tasks) with NACE/AMPP, Veriforce, and/or OQSG. The following list describes Ucorr’s team members that will be involved in this project and their roles/responsibilities within the project:
x Ian Budner, E.I.T. – Project Manager, Senior Corrosion Engineer and NACE Cathodic Protection Technician serving as the project manager and point of contact serving as lead for data management/input, data analysis, report writing, and GIS data integration with over 12 years of experience in similar projects including pipeline CP evaluations/DOT annual surveys, as well as project management, construction management, and CP/corrosion control designs. Has led multiple corrosion/CP field evaluations and assessments for various clients in the water, wastewater, and oil & gas industries. Mr. Budner holds two registered patents dealing with corrosion monitoring and cathodic protection systems.
x Omidreza Moghbeli, P.Eng. – Alberta, Canada registered Professional Engineer and NACE Cathodic Protection Technologist serving as the technical lead for all corrosion/CP system data analysis, designs, reports, etc. with over 26 years of international experience in, corrosion engineering, cathodic protection, construction/ construction management, metallurgical engineering, material/coating selection and assessments, and failure analysis. Has provided QA/QC, project management, and corrosion/CP consulting services for many similar projects in the water/wastewater and Oil & gas industries. Mr. Moghbeli holds nine registered patents dealing with corrosion monitoring and cathodic protection systems.
x Siamak Azimie, P.E. – California registered Civil Engineer in charge of Quality Assurance/Quality Control of all activities. Mr. Azimie has over 42 years of extensive corrosion control project management, corrosion control design project management, civil engineering project management, and construction management for large water/wastewater operations with Eastern Municipal Water District. x Carlos Pacheco –Corrosion Engineer and NACE Cathodic Protection Technician in charge of data management/input, GIS Data integration, and report writing. Mr. Pacheco has 6 years of experience in cathodic protection system evaluations, design and drafting, corrosion rate analysis, direct assessment, and materials and corrosion engineering.

Mr. Pacheco holds OQ certifications for CP system testing, installation, evaluation, and troubleshooting with Veriforce.
x Sebastian Borucki – Senior Corrosion Technician, NACE Cathodic Protection Tester and Coating Inspector Level 1 in charge of field operations with 14 years of similar project experience including pipeline and reservoir cathodic protection/corrosion monitoring system evaluations and DOT Annual surveys. Mr. Borucki also has extensive experience in condition assessment, rectifier assessment/troubleshooting, internal pipeline inspections, electrical continuity surveys, cathodic protection system materials and installations, and specialized surveys for the water, wastewater, and oil & gas industries. Mr. Borucki holds two registered patents dealing with corrosion monitoring and cathodic protection systems.
x Daniel Arizmendi – Corrosion Technician holding OQ certifications for CP system testing, troubleshooting, and evaluation with OQSG including AOC, conducting annual CP surveys, inspecting CP rectifiers, CP rectifier maintenance and troubleshooting, inspecting/verifying test lead continuity, soil resistivity testing, and maintaining test leads. Conducted CP system surveys/evaluations for multiple clients in the water, wastewater, and oil & gas industries.
x Christie Curran – Administrative manager, in charge administrative support including daily paperwork, reports, permitting, training/compliance, and budgeting.
x Dominik Borucki – Corrosion Technician holding OQ certification for CP system testing, conducting annual CP surveys, inspecting/verifying test lead continuity and maintaining test leads. Performed CP system surveys for multiple clients in the water, wastewater, and oil & gas industries including CP system annual surveys.

Following, Ucorr has included brief resumes of all key personnel that will be involved in the City’s Corrosion Protection Consulting Services Project. All resumes demonstrate the qualifications and experience related to the subject project and highlight each team member’s education, licenses, certifications, publications, patents, training, relevant work experience, and specific responsibilities for the services described. Complete, detailed resumes can be provided upon request.

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 17 IAN BUDNER, B.SC., E.I.T. – PROJECT MANAGER,POINT OF CONTACT, AND SENIOR CORROSION ENGINEER

EDUCATION PROFESSIONAL AFFILIATIONS
x B.Sc. Civil Engineer, California State Polytechnic University – Pomona, 2010
x NACE International

PROFESSIONAL REGISTRATIONS,CERTIFICATIONS,&PATENTS
x Engineer in Training (EIT): Fundamentals of Engineering Exam Board of Professional Engineers, Land Surveyors, and Geologists (April, 2009)
x NACE Cathodic Protection Technician 2011 (CP Level 2) x Embedded AC Mitigation System (US Patent #9774105)
x Modified Rectangular Wave Polarization Control System (US Patent #20220397459)

ADDITIONAL COURSES
x First Aid, AED, and CPR
x NACE Cathodic Protection Technician 2011 (CP Level 2) x NCCER, OQSG, and Veriforce Operator Qualification
Programs
x OSCA Refinery Safety Orientation (RSO)
x OSHA 30-hour Construction Safety Training
x Permit Required Confined Space
x Pipeline and Hazardous Materials Safety Administration (PHMSA) Supervisor Training
x Veriforce Certified Covered Task Field Evaluator

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC (Ucorr) | Manager - Operations | Rancho Cucamonga, CA | Feb. 2014 to Present o City of San Clemente | San Clemente, California; In charge of project management, data processing & analysis, cathodic protection/corrosion control geodatabases creation, report writing, and facilities map preparation & organization for all the City’s CP system facilities for their reclaimed water systems, domestic/potable water systems, reservoirs, pump stations, and pier. Designed CP system improvement/repair plans. o Coachella Valley Water Department through Exaro Technologies | Various Cities, California; Project manager and point of contact for the project. Coordinating with various cities and crews to schedule field activities. Reviewed continuity, underwater structure-to-electrolyte measurements, other CP field survey data, and data tabulation/analysis. o Long Beach Water Department (though GHD Inc.) | Long Beach, California; Project manager for a comprehensive continuity and interference study on a 1000-ft stretch of main water pipeline that included various run of close interval potential surveys (CIPS), Pipeline current mapping (PCM), interrupted potential measurements on test pipeline test stations and pipeline laterals, coordination with foreign, nearby pipeline owners for interference studies. o Eastern Municipal Water District | Perris, California; Performed field evaluation of existing water pipeline including test station survey, soil resistivity measurements, and provided corrosion monitoring system design based on field evaluation. o San Diego County Water Authority | Provide data analysis and report writing for cathodic protection system evaluations of the Miramar Pump Station Facilities (Kiewit) and Padre Dam Flow Control Facilities (Filanc). o Southern California Gas/Sempra Energy | Multiple Locations, California; Internal/external corrosion monitoring data analysis and reporting for ER probes, UT probes, and CP coupons probes installed on various regulated gas pipelines and facilities throughout southern California.
o Marathon Petroleum | Martinez, California; Performed Close Interval Potential Survey (CIPS) and complete cathodic protection system evaluation on multiple product lines and reservoirs in the Amorco Terminal and Amorco Dock. o TerranearPMC | Burbank, California; Impressed Current Cathodic Protection (ICCP) system evaluation, data analysis, improvement recommendations, and design CP system design improvements for well casings and water pipelines. x HDR Engineering, Inc. (HDR|Schiff) | Junior Corrosion Engineer/Project Manager | Claremont, CA | Feb. 2011 to Feb. 2014 o Calleguas Municipal Water District │ CP Condition Assessment and Troubleshooting Survey, Thousand Oaks, California; Performed field survey (pipe to soil potential, continuity testing, Closed Interval Potential Survey (CIPS), electrical isolation testing, and review of existing crossings, analyzed data and provided reports. o Oxy Long Beach, Inc. | Corrosion Protection System Evaluation, Port of Long Beach, California; Complete CP system evaluation including continuity, current requirement, and stray current interference testing. Developed a plan for CP system rehabilitation and improvements for the oil gathering /water injection pipeline systems at the Port of Long Beach. x Schiff Associates | Field Engineer | Claremont, CA | June 2011 to Feb. 2011 o Otay Water District | Cathodic Protection System Survey, San Diego, California; Complete cathodic protection evaluation/test station field survey of over 80 pipelines and CP evaluations of 29 reservoirs. Completed all data entry, analysis, and GIS integration.

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 18 OMIDREZA MOGHBELI, M.SC., P.ENG.–SENIOR CORROSION ENGINEER &DESIGN

EDUCATION PROFESSIONAL REGISTRATIONS,CERTIFICATIONS,&PATENTS x M.Sc. Metallurgical Engineering (Corrosion and Material Protection), Azad University of Tehran, Science &
Research Centre, 1999
x B.Sc. Metallurgical Engineering (Foundry), Azad University of Karaj, 1996
x Member of APEGGA (The Association of Professional
Engineers, Geologists, and Geophysicists of Alberta,
Canada) – Metallurgy License No. 82943
x NACE Cathodic Protection Technologist 2008 (CP Level 3) x Holds Nine Registered Patents Related to Corrosion
Control & Cathodic Protection

ADDITIONAL COURSES
x NACE, NCCER, and Veriforce Operator Qualification
Programs
x Pipeline and Hazardous Materials Safety Administration (PHMSA) Supervisor Training
x First Aid, AED, and CPR
x OSHA 10-hour Construction Safety Training
x Permit Required Confined Space
x Welding Inspection with Ultrasonic – Level 1

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC | Principal Engineer | Rancho Cucamonga, CA | Feb. 2014 to Present o City of San Clemente | San Clemente, California; Project manager, technical lead for data analysis, design calculations/drawings and installation. Review all deliverables packages including design efforts, budgetary cost estimates, prioritized mitigation recommendations, and comprehensive survey reports. o Long Beach Water Department | Long Beach, California; Phase IV cathodic protection system field investigation, design, and installation. Principal engineer reviewing all data analysis and CP system design work. o Long Beach Water Department (though GHD Inc.) | Long Beach, California; Technical lead for a comprehensive continuity and interference study on a 1000-ft stretch of main water pipeline. Developed a testing strategy to accurately pinpoint multiple discontinuities between test stations and provided final interference analysis results interpretation. o Cucamonga Valley Water District | Rancho Cucamonga, California; Provided failure analysis and corrosion/metallurgical consulting services for the water districts facilities. o Mladen Buntich Construction Co., Inc. | Rancho Cucamonga, California; Provided consulting services for construction contractor and completed technical review of CP commissioning reports, CP system evaluation data, CP system specifications, as-builts, and client correspondence. Provided recommendations moving forward with existing CP system. o TerranearPMC | Burbank, California; Impressed Current CP system evaluation and design improvements. o Southern California Gas/Sempra Energy | Multiple Locations, California; Internal/external corrosion monitoring data analysis and reporting for ER probes, UT probes, and CP coupons probes installed on various regulated gas pipelines and facilities throughout southern California.
x HDR Engineering, Inc. (HDR|Schiff) | Manager – Engineering Services | Claremont, CA | Aug. 2011 to Nov. 2013 o Eastern Municipal Water District | Provided as needed Metallurgical/Corrosion Engineering Services, Failure Analysis, CP System Evaluation. Provided supervision on all corrosion monitoring and Cathodic Protection surveys. x Corrpro Companies | Senior Engineer | Santa Fe Springs, CA | Mar. 2011 to Aug. 2011 o Inland Empire Utilities Agency | East Recycled Water Pipeline Corrosion Assessment, Rancho Cucamonga; Corrosion test station survey to assess the need for cathodic protection systems. x Schiff Associates | Senior Corrosion Engineer/Special Operations Division Manager | Claremont, CA |Aug. 2009 to Nov. 2010 o Inland Empire Utilities Agency | Chino, California; Inline corrosion inspection for Carbon Canyon water treatment center. x Worley Parsons | Integrity Engineer | Calgary, Alberta, Canada | May 2006 to June 2009 o Albian Sands Energy, Inc. | Expansion 1 Project – EPCM, Alberta, Canada; Performed cathodic protection design, coating selection, and wrote specifications for intersite/underground pipelines. Designed internal and external cathodic protection systems for all storage tanks, process vessels, and intersite pipelines. x Alberta Corrosion Technologies, Inc. | President/Project Manager | Calgary, Alberta, Canada | Oct. 2003 to June 2006 o Zang Setizan Shargh Eng. Co. (ZSS) | Tehran, Iran; Corrosion survey and monitoring equipment procurement through agency agreements. Train and certify client’s personnel with survey techniques and data interpretation. x Zang Setizan Shargh Eng. Co./Plarck Sanat Ltd. | CEO, Engineer/President, Engineer | Tehran, Iran | Aug. 1996 to Aug. 2003 o Lar Consultant Engineers | Arak Water Pipeline, Arak, Iran; Site survey, design and material procurement for cathodic protection for the NPS 36 Arak water pipeline (125 km) in central Iran. Project Manager, cathodic protection design review and final approval, procurement and managing the installation.

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 19 SIAMAK AZIMIE, M.SC., P.E. – QA/QC ENGINEER &DESIGN/REPORT REVIEW

EDUCATION
x Master of Science Degree in Civil Engineering, California State University, Long Beach, 1992 x Bachelor of Science Degree in Civil Engineering, California State University, Los Angeles, 1981

PROFESSIONAL REGISTRATIONS &CERTIFICATIONS PROFESSIONAL AFFILIATIONS x Professional Engineer, Civil – California (C59465)
x General Engineering Contractor License “A” – California (969080)
x Cross Connection Control Specialist, USC
x Principals of Supervision
x Supervisor’s Academy
x Water Facility Corrosion
x Traffic Control, Trenching & Excavation Safety Program x ASCE – American Society of Civil Engineers
x APWA – American Public Works Association
x CWEA – California Water Environment Association
x CCEA – City and County Engineering Association
x IASEA – Iranian American Society of Engineers and
Architects – President, Board of Directors
x OCWA – Orange County Water Association
x AWWA – American Water Works Association
x CMAA – Construction Management Association of
America

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC | Senior Civil Engineer/Project Manager | Rancho Cucamonga, CA | Dec. 2016 to Present o City of San Clemente | Provided QA/QC for the CP system annual survey evaluations and reports for the City’s pipelines, reservoirs, pump stations, and pier.
o Marathon Pipeline (Previously Andeavor) | Various Cities, Southern California; Provided QA/QC for CP survey reports and designs for various projects including Berth 121 and Long Beach Terminal cathodic protection improvements. o Long Beach Water Department | Project Manager, client contact, Engineering, and QA/QC review for cathodic protection system evaluation, design, and construction management of recycled water pipelines, Phase IV. x NCE, Inc. | Senior Program Manager | Fountain Valley, CA | 2014 to 2015 o Assist public agencies in reviewing private improvements to ensure compliance with latest City’s Rules and Regulations, and Standard Specifications and lead/managed misc. project or programs for public agencies and special districts. o Manage assigned engineering projects and coordinated with project personnel. o Establish details for proposals and reviewed proposals for design and construction projects. o Managed construction projects as well as aided in establishment of the firm’s annual budget. o Develop contractual documents for the agencies use and recommend selection of engineering design consultant; oversee coordination and management of engineering consultants. x Inland Empire Utilities Agency and City of Ontario | Senior Project Manager/Engineer | Ontario, CA | 2003 to 2012 o Recycled Water Program. IEUA Recycled Water Program Manager. The program involved site investigation, preparation of retrofit plans, preparation of engineering report, cross-connection testing, up to completion and energizing recycled water to the site. Worked directly with agency’s seven (7) member agency staff in planning, design, construction and managing expansion of the regional recycled water system. o Capital Improvement Projects. Managed over $75 million in design and construction projects including more than 30 miles of 20-48 inch pipelines, pump stations and reservoirs. Was IEUA’s lead in regional Recycled Water project coordination with all its seven (7) member agencies.
x City of Ontario | Principal Engineer | Ontario, CA | 2003 to 2005 o Supervised engineering division and supervised, planned, and administered the City’s water quality program o Committee member, Department’s Regulatory Compliance, interpret policies/procedures established by regulatory agencies
o Supervised coordination of plan checking with operation and maintenance staff x Elsinore Valley Water District | Senior Engineer | Lake Elsinore, CA | 2000 to 2003 o Supervised and coordinated work of engineering and field personnel to determine long range capital improvement program – including, water, wastewater, and recycled water x City of Fullerton | Project Manager (Associate Engineer) | Fullerton, CA | 1989 to 2000 o Supervised/managed planning, engineering design, and construction of the City’s CIP’s o Supervised the City’s water conservation program
x Irvine Ranch Water District | Associate Engineer/Development Supervisor | Irvine, CA | 1981 to 1989 o Prepared plans, specifications, and environmental impact reports for water, wastewater, and recycled water facilities

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 20 CARLOS PACHECO, B.SC.–CORROSION ENGINEER &DRAFTING

EDUCATION PROFESSIONAL AFFILIATIONS/REGISTRATIONS
x B.Sc. Chemical and Materials Engineering, California State Polytechnic University – Pomona, 2019
x NACE Cathodic Protection Technician (CP-2)

ADDITIONAL COURSES
x OQSG, and Veriforce Operator Qualification Programs
x OSCA Refinery Safety Orientation (RSO)
x OSHA 10-hour Construction Safety Training
x Permit Required Confined Space

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC (Ucorr) | Corrosion Engineer| Rancho Cucamonga, CA | Feb. 2018 to Present o City of San Clemente | San Clemente, California; Prepared cathodic protection/corrosion control geodatabases, performed cathodic protection field survey and data tabulation/analysis, preparation of map for all the City’s CP system facilities for their reclaimed water systems, domestic/potable water systems, reservoirs, pump stations, and pier. Helped develop and draft CP system improvement/repair plans.
o Coachella Valley Water Department through Exaro Technologies | Various Cities, California; Performed pipeline continuity, underwater structure-to-electrolyte measurements, other CP field survey data, and data tabulation/analysis. o Long Beach Water District | Long Beach, California; Phase IV cathodic protection system field investigation, soil resistivity measurement and test station measurements data tabulation/analysis for multiple steel and ductile iron water pipelines. o Long Beach Water Department (though GHD Inc.) | Long Beach, California; Data collection, tabulation and analysis for a comprehensive continuity and interference study of a main water pipeline that included various run of close interval potential surveys (CIPS), Pipeline current mapping (PCM), interrupted potential measurements on test pipeline test stations and pipeline laterals.
o Cucamonga Valley Water District | Rancho Cucamonga, California; Performed analysis of conditions of stainless steel weir plates that had experience deterioration. Developed recommendations of material selection options for replacement of weir plate material.
o Marathon Pipeline | Various Cities, Southern California; Performed CIPS and DCVG data collection and tabulated, analyzed, and prepared CIS reports for various DOT regulated oil pipelines of varying diameters utilizing Impressed Current Cathodic Protection (ICCP) systems.
o Eastern Municipal Water District | Multiple Locations, California; Perform tabulation, analysis and report preparation for CP system evaluations, test station surveys, interference studies, and electrical isolation/continuity testing for multiple water/recycled water pipelines. Conducted pipe-to-soil potential measurements to determine the structural integrity of current anodes and to ensure that CP systems are working properly during and after construction. o Southern California Gas/Sempra Energy | Multiple Locations, California; Internal/external corrosion monitoring data analysis and reporting for ER probes, UT probes, and CP coupons probes installed on various regulated gas pipelines and facilities throughout southern California.
o Andeavor Logistics | Long Beach, California: Cathodic Protection Survey and Improvement design for multiple land-side and marine-side structures.
o Tesoro Logistics | Carson/Stockton California; Complete cathodic protection system evaluation on multiple tanks in the Carson and Stockton Terminals.
o TerranearPMC | Burbank, California; Impressed Current Cathodic Protection (ICCP) system evaluation for well casings and installation of ICCP system improvements.
o Marathon Pipeline Annual CIS| CIS Reports, Long Beach, California; Tabulated, analyzed, and prepared reports for CIS data obtained from various Marathon pipelines to make recommendations based on NACE criterion for CP x CAL POLY POMONA | Researcher| Rancho Cucamonga, CA | Feb. 2014 to 2021 o CME Department | Electrochemical evaluation of corrosion properties of metallic-alloys; Performed polarization tests of metallic-alloys in electrolytic solution to evaluate corrosion properties, metallurgically prepared metal samples, performed data extraction, calculation and analysis, performed surface analysis using various types of microscopy.

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 21 SEBASTIAN BORUCKI –SENIOR CORROSION TECHNICIAN &FIELD FOREMAN

PROFESSIONAL CERTIFICATIONS PROFESSIONAL AFFILIATIONS &PATENTS x NACE Coatings Inspector 2011 (CIP-1) No. 35496
x NACE Cathodic Protection Tester 2010
x Modified Rectangular Wave Polarization Control System (US Patent #20220397459)
x Automated Tank Cathodic Protection Monitoring System, (US Patent #10018864)

ADDITIONAL COURSES
x BAC Pin Brazing
x First Aid, AED, and CPR
x NACE Cathodic Protection Tester 2010
x NACE Coatings Inspector 2011 (CIP Level 1)
x NACE, NCCER, OQSG, and Veriforce Operator Qualification Programs
x OSCA Refinery Safety Orientation (RSO)
x OSHA 30-hour Construction Safety Training
x Permit Required Confined Space

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC (Ucorr) | Manager – Field Services | Rancho Cucamonga, CA | Sep. 2014 to Present o City of San Clemente | San Clemente, California; In charge of all field activities including inspection/documentation, potential surveys, continuity survey, PCM survey, stray current studies, and improvements/repairs installation for the City’s reclaimed water systems, domestic/potable water systems, reservoirs, pump stations, and pier. o Coachella Valley Water Department through Exaro Technologies | Various Cities, California; In charge of collecting pipeline continuity, underwater structure-to-electrolyte measurements, other CP field survey data. o Long Beach Water Department (though GHD Inc.) | Long Beach, California; In charge of filed activities for a comprehensive continuity and interference study of a main water pipeline that included various run of close interval potential surveys (CIPS), Pipeline current mapping (PCM), interrupted potential measurements on test pipeline test stations and pipeline laterals.
o Tesoro Logistics | Martinez, California; Performed Close Interval Potential Survey (CIPS) and complete cathodic protection system evaluation on multiple product lines in the Amorco Terminal and Amorco Dock. o Southern California Gas/Sempra Energy | Multiple Locations, California; Internal/external corrosion monitoring data collection for ER probes, UT probes, and CP coupons probes installed on various regulated gas pipelines and facilities throughout southern California.
o California Resources Corporation | Long Beach, California; Performed complete DOT-regulated CP system evaluation survey including CIS, DCVG, pipeline current mapping, depth of cover, test station survey, and rectifier survey for numerous oil, gas, and water pipelines.
o TerranearPMC | Burbank, California; Impressed Current Cathodic Protection (ICCP) system evaluation for well casings and installation of ICCP system improvements.
o Long Beach Water Department through Paso Robles Tank, Inc. | Long Beach, California; Performed sacrificial (passive) CP system improvement material procurement and installation for approximately 30 water storage reservoirs. x HDR Engineering, Inc. (HDR|Schiff) | Corrosion Technician/Coatings Inspector | Claremont, CA | Feb. 2011 to Sep. 2014 o City of Huntington Beach | Annual surveys of buried water pipelines, Huntington Beach, California; Performed field surveys including pipe-to-soil potentials, electrical continuity testing, On/Off surveys, insulated flange testing, rectifier testing and adjustments, and data analysis.
o City of Phoenix │ Tank CP Condition Assessment and Troubleshooting Survey, Phoenix and adjacent city’s, Arizona; Performed field survey of existing CP systems, current requirement testing to establish coating loss, and analyzed data and generated reports.
o Frank Coluccio Construction (City of Honolulu) | Cathodic Protection System Troubleshooting and Rehabilitation, Honolulu, Hawaii; CP system installation including test stations, anodes, CAD welded and pin brazed connections, rectifiers and junction boxes, and insulating flange kits. Troubleshooting and survey of existing and new CP systems. x Schiff Associates | Corrosion Technician/Coatings Inspector | Claremont, CA | Nov. 2009 to Feb. 2011 o Eastern Municipal Water District | Cathodic Protection System Evaluation & Improvements/Construction Management, City of Perris, California; Potential survey, current requirement testing, electrical continuity testing, soil resistivity testing, rectifier troubleshooting, and pipeline discontinuity repairs. o Otay Water District | Cathodic Protection System Survey, San Diego, California; Test station survey of over 80 pipelines and CP evaluation of 29 reservoirs.

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 22 DANIEL ARIZMENDI –CORROSION TECHNICIAN

EDUCATION PROFESSIONAL CERTIFICATIONS
x WyoTech Electrical Technology Degree - Long Beach, 2010 x OSHA 10-Hour Construction Safety Training x Veriforce and OQSG Operator Qualification Program

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC (Ucorr) | Corrosion Technician | Rancho Cucamonga, CA | Nov. 2016 to Present o City of San Clemente | San Clemente, California; Assisted with all field activities including inspection/documentation, potential surveys, continuity survey, PCM survey, stray current studies, and improvements/repairs installation for the City’s reclaimed water systems, domestic/potable water systems, reservoirs, pump stations, and pier. o Coachella Valley Water Department through Exaro Technologies | Various Cities, California; In charge of collecting pipeline continuity data, underwater structure-to-electrolyte measurements, other CP field survey data. o Long Beach Water Department through Paso Robles Tank, Inc. | Long Beach, California; Performed sacrificial (passive) CP system improvement material procurement and installation for approximately 30 water storage reservoirs. o Long Beach Water Department | Long Beach, California; Phase IV cathodic protection system field investigation, soil resistivity measurement, test station measurements, and data analysis for multiple steel and ductile iron water pipelines. o Air Products | Various Cities, Southern California; Performed line locating and pipeline current mapping (PCM) on newly acquired hydrogen gas pipelines.
o Getty Center | Los Angeles, California; Collected field data for cathodic protection system testing and evaluation. Assisted in installation of cathodic protection system improvements. o Paramount Pipeline (through World Energy) | Various Cities, Southern California; Performed close interval potential surveys (CIPS), pipeline current mapping (PCM), annual test station structure-to-electrolyte potential measurements, and Cathodic Protection system improvements installation.
o San Bernardino Airport | San Bernardino, California; Performed annual survey including, visual inspection of test stations, test lead integrity, and pipe-to-soil measurements. Performed bi-monthly rectifier inspection and output measurements. o California Resources Corporation | Long Beach, California; Performed complete DOT-regulated CP system evaluation survey including CIS, DCVG, pipeline current mapping, depth of cover, test station survey, and rectifier survey for numerous oil, gas, and water pipelines.
o Marathon Pipeline | Various Cities, Southern California; Performed CIPS, DCVG, and Test Station data collection for DOT regulated oil pipelines of varying diameters utilizing Impressed Current Cathodic Protection (ICCP) systems. o TerranearPMC | Burbank, California; Impressed Current Cathodic Protection (ICCP) system evaluation for well casings and installation of ICCP system improvements.
o San Diego County Water Authority | Provide field data collection for cathodic protection system evaluations of the Miramar Pump Station Facilities (Kiewit) and Padre Dam Flow Control Facilities (Filanc). x Allfast Fastening Systems | Machine Operator/Maintenance Technician | City of Industry, CA | May 2011 to Nov. 2016 o Maintenance and troubleshooting of mechanical and electrical systems. o Metallurgical heat treatment and induction heat treatment machines. o Machine operations and maintenance.
x Marcowall Inc. | Apprentice | Gardena, CA | Aug. 2008 to Jan. 2009 o Scaffold builder certification.
o First aid and safety certification courses.
o General construction projects.

PROJECT ORGANIZATION AND STAFFING
www.ucorr.net Universal Corrosion Services, LLC Page 23 CHRISTIE CURRAN –ADMINISTRATIVE MANAGER

EDUCATION PROFESSIONAL CERTIFICATIONS/CREDENTIALS
x B.Sc. Social Science, California Polytechnic State University – San Luis Obispo, 2007
x M.Sc. Education, National University 2015
x BTSA through Orange County Department of Education
x Single Subject Teaching Credential through National
University

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC (Ucorr) | Administrative Manager | Rancho Cucamonga, CA | Oct. 2021 to Present o Office Administrative Manager; Provided project support and in charge of all administrative and accounting duties including preparing invoices, managing AP/AR accounts with clients and vendors for material procurement tasks, compliance and safety requirements, scheduling, and maintaining payroll/certified payroll records for various clients in various cities, including:
ƒ Coachella Valley (through Exaro Technologies) | Various Cities, Southern California ƒ Paramount Pipeline (through World Energy) | Various Cities, Southern California ƒ TerranearPMC |Burbank, California
x Lorbeer Middle School | Educator/PBIS Group Manager | Diamond Bar, CA | to Aug. 2017 to Oct. 2021 o Teacher Teaching Specialist (TTS); Designed, implemented, and managed various school-wide support system structures for diverse student population.
o Positive Behavior Intervention & Support (PBIS) Coach; Implemented school wide positive behavior system for students. o AVID Team Member
x Masuda Middle School | Supervisor/Educator | Fountain Valley, CA | Sep. 2014 to Jul. 2017 o Tutoring Supervisor
o Taught social studies and honors English language arts x St. Angela Merici Parish School | Educator/PBIS Group Manager | Brea, CA | Aug. 2011 to Jun. 2014 o Middle School Level Coordinator
o Green Team Club Moderator
x Placentia Yorba Lind Unified School District | Educator | Yorba Linda, CA | Sep. 2009 to Jun. 2011 o Student teacher and substitute teacher in English language arts and math.

DOMINIK BORUCKI –CORROSION TECHNICIAN

EDUCATION PROFESSIONAL CERTIFICATIONS
x Kinesiology Degree in Progress – University of Saint Francis, Indiana x Veriforce and OQSG Operator Qualification Program

RELEVANT WORK EXPERIENCE
x Universal Corrosion Services, LLC (Ucorr) | Corrosion Technician | Rancho Cucamonga, CA | Nov. 2020 to Present o Coachella Valley Water Department through EXARO Technologies | Various Cities, Southern California; Field testing including pipeline continuity testing, structure-to-electrolyte, and structure lead integrity testing. o Long Beach Water Department (though GHD Inc.) | Long Beach, California; Data collection for a comprehensive continuity and interference study of a main water pipeline that included various run of close interval potential surveys (CIPS), Pipeline current mapping (PCM), interrupted potential measurements on test pipeline test stations and pipeline laterals.
o TerranearPMC | Burbank, California; Assisted with Impressed Current Cathodic Protection (ICCP) system evaluation data collection for well casings.
o Marathon Pipeline | Various Cities, Southern California; Assisted with CIPS, DCVG, and Test Station data collection for DOT regulated oil pipelines of varying diameters utilizing Impressed Current Cathodic Protection (ICCP) systems. o World Energy (Paramount Pipeline) | Various Cities, Southern California; Assisted with close interval potential surveys (CIPS), pipeline current mapping (PCM), annual test station structure-to-electrolyte potential measurements, and Cathodic Protection system improvements installation.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 24 All key personnel have been involved in several teaming experiences in projects similar to this solicitation. Ucorr’s team has vast experience and expertise related to project management, corrosion services consulting, cathodic protection/corrosion monitoring system evaluations, specialized corrosion/cathodic protection system surveys, corrosivity studies, and corrosion monitoring/cathodic protection system designs, and cathodic protection system installations for reservoirs and steel, ductile iron, mortar-coated steel, and prestressed concrete cylinder pipelines, and offshore structures in the water, wastewater, and oil & gas industries. Ucorr’s project manager and senior personnel have vast experience in engineering consulting/management of small, mid-size, and large corrosion/civil engineering projects in the water, wastewater, and oil & gas industries for the private sector as well as public entities including cities, utility agencies, and water districts. A detailed description of all key personnel including qualifications, experience, licenses/certifications, project roles, and brief resumes can be found in the “Project Organization & Staffing” section of this proposal package.

Our team’s extensive and wide-ranging experience has created a highly synergistic team capable of providing the highest quality services for the City of San Clemente.

Ucorr was successful in executing service/consulting contracts with the following entities for corrosion engineering services and cathodic protection services:
x City of San Clemente
x Coachella Valley Water District
x Long Beach Water Department
x World Energy
x Marathon Petroleum
x City of Eureka
x City of Santa Monica
x Irvine Ranch Water District
x San Diego County Water Authority
x Sempra Utilities – Southern California Gas Company and San Diego Gas & Electric. x Cucamonga Valley Water District
x California Resources Corporation
x City of Burbank (TerranearPMC)
x Eastern Municipal Water District
x Air Products
Additionally, Ucorr has provided eleven relevant examples of past project experiences similar to the nature of this solicitation including references in the following pages demonstrating our key personnel’s competence to perform the subject services. Each of the project examples include client contact information, description of work/services provided, contract amount, project dates, location of work, and key personnel and their responsibilities.

The project examples detailed below also highlight our team members’ involvement/collaboration in numerous projects related to the subject RFP.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 25

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
City of San Clemente
2019-2021 Annual Cathodic Protection System Testing
and Evaluation, Rectifier Upgrades, & CP System
Maintenance/Repairs
San Clemente, CA

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Michael Fakhar (949) 340-6640 / [email protected] 380 Avenida Pico, Bldg. N San Clemente, CA 92672

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Project Manager Oversees all corrosion/cathodic protection-related projects for the City of San Clemente.

TOTAL COSTS START DATE COMPLETION DATE
$253,000 December, 2018 September, 2021

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Ian Budner Project manager overseeing all aspects of the project and point of contact for the client. In charge of data analysis and report preparation.

Siamak Azimie Provided QA/QC for data analysis, report preparation, and improvement designs.

Omidreza Moghbeli Technical lead for data analysis and conclusions as well as improvements and repairs design.

Carlos Pacheco Data tabulation and analysis, report preparation, Improvement and design drafting.

Sebastian Borucki Field foreman, including data collection and repairs/construction.

Daniel Arizmendi Data collection, CP System testing, and repairs/construction.

Dominik Borucki Data collection/CP system testing.

Nazila Zohadi Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Design services, Field Investigations & Surveys, Repair & Maintenance Services, Construction Support

DESCRIPTION OF SERVICES
Completed 3-year annual cathodic protection system testing and evaluation contract which included test station locating, inspecting, and surveying including photodocumentation, AC/DC interrupted pipe-to-soil potentials, and submeter GPS coordinates on various water and wastewater pipelines, reservoirs, pump stations, and a pier protected by a combination of impressed current and sacrificial cathodic protection system. Performed a close interval potential survey (CIPS), direct current voltage gradient (DCVG) survey, and pipeline current mapping (PCM) survey to assess the existing cathodic protection system, protective coatings, stray current interference and continuity study. Prepared a comprehensive integrity analysis of all facility data including test station, rectifiers, reservoir & pump station test points with submeter GPS. Provided designs for urgent repairs needed due to degraded rectifiers/CP systems and continuity issues. Procured and installed necessary material for urgent repairs including rectifier upgrades and continuity repairs. Provided prioritized recommendations to address indications encountered from all survey data and to improve the quality of protection on all the city’s facilities.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 26

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
Long Beach Water Department and
City of Eureka through GHD Inc.

LBWD Golden Ave Stray Current Project and
Eureka South Interceptor Electrical Continuity
Investigation Project
Long Beach, CA & Eureka, CA

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Jeff Knauer (510) 420 3312 / [email protected] 6001 Shellmound Street, Suite 850 Emeryville, CA 94608

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Project Engineer Oversees all engineering/construction projects.

TOTAL COSTS START DATE COMPLETION DATE
Long Beach Water Department: $45,560
City of Eureka: $28,197
October, 2020 and
July, 2021
December, 2020 and
July, 2021

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Ian Budner Project manager overseeing all aspects of the project. In charge of data analysis and report preparation.

Omidreza Moghbeli Provided QA/QC for data analysis and report preparation.

Carlos Pacheco Field data collection, data tabulation and analysis.

Sebastian Borucki In charge of field data collection.

Daniel Arizmendi Field testing & data collection.

Dominik Borucki Field testing & data collection.

Nazila Zohadi Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Field Investigations & Surveys

DESCRIPTION OF SERVICES
Performed interference and electrical continuity studies on a water main in Long Beach, CA. Collected interrupted potential measurements to assess the performance of existing cathodic protection systems. Performed close interval potential survey (CIPS), direct current voltage gradient (DCVG), and pipeline current mapping (PCM) surveys under different conditions to examine the influence of the installed CP system as well as nearby foreign structures and their corresponding CP systems. PCM was also performed to identify current pick up/drop off locations as well as to pin-point pipeline electrical discontinuities. Pinpointed locations of interference for mitigative efforts. Soil samples were collected for laboratory resistivity/chemical analysis. Submeter GPS was collected during all field activities.

Provided tabulated results and analysis as well as prioritized recommendations and budgetary cost estimate for mitigation efforts.

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
Coachella Valley Water District through EXARO
Technologies Corporation
Coachella Valley Water District – Cathodic Protection
System Testing & Improvements Project Various Cities, Southern California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Hector Dominguez (650) 777-4324 / [email protected] 1831 Bayshore Hwy.

Burlingame, CA 94010

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
President Project management for all engineering/construction projects regarding corrosion control/cathodic protection.

TOTAL COSTS START DATE COMPLETION DATE
$114,000 September, 2022 Ongoing

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Ian Budner Project manager overseeing all aspects of the project and point of contact for the client. In charge of data analysis and report preparation.

Omidreza Moghbeli Provide QA/QC for data analysis and report preparation.

Carlos Pacheco Data tabulation and analysis and report preparation.

Sebastian Borucki In charge of all field activities, including data collection and repairs.

Daniel Arizmendi Field testing.

Dominik Borucki Field testing.

Christie Curran Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Field Investigations & Surveys

DESCRIPTION OF SERVICES
Cathodic protection improvements testing and evaluation on various Coachella Valley Water district facilities, including water pipelines, stormwater channels, canal structures, and sheet piling. Testing included native and interrupted structure-to-electrolyte potential readings at all facility test points and test stations, utilizing portable current interrupters where necessary, CP system current sources output and performance testing, and continuity & interference testing for pipelines utilizing circulating current method, interrupted potential readings and pipeline mapping current (PCM) method. Prepare a comprehensive report including results, findings, and prioritized recommendations to address indications encountered from all survey data.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 27

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
World Energy (Paramount Pipeline)
Annual Cathodic Protection Surveys, Over-the-Line
Surveys, & Line 3 CP Improvements Design and
Installation
Various Cities, Southern California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Jason Nick (650) 777 4324 / [email protected] 14700 Downey Ave.

Paramount, CA 90723

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Pipeline Manager Oversees projects related to corrosion control, pipeline integrity/compliance, and cathodic protection.

TOTAL COSTS (TO DATE) START DATE COMPLETION DATE
$1,100,000 September, 2020 Ongoing

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Ian Budner Project manager overseeing all aspects of the project and point of contact for the client. In charge of data analysis, report preparation, improvements designs and drawings.

Siamak Azimie Provide QA/QC for improvement designs and drawings.

Omidreza Moghbeli Technical lead for data analysis, report preparation, design calculations and design drawings.

Carlos Pacheco Data tabulation and analysis. Assist with report preparation. Designed and drafted CP improvements.

Sebastian Borucki In charge of all field activities, including data collection and repairs.

Daniel Arizmendi Assisted with all field activities, including data collection and repairs.

Dominik Borucki Assisted with all field activities, including data collection and repairs.

Christie Curran Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Design Services, Construction/Construction Support Services, Field Investigations & Surveys

DESCRIPTION OF SERVICES
Cathodic protection system testing and evaluation on various reservoirs and pipelines spanning over various cities. Generated a comprehensive facility list complete with inspection photographs and submeter GPS coordinates for all reservoirs test points, test stations, rectifiers, and other facility structures. Testing included native and interrupted structure-to-electrolyte potential readings at all facility test points and test stations, utilizing portable current interrupters where necessary, CP system current sources output and performance, and continuity & interference testing for pipelines utilizing circulating current method, interrupted potential readings and pipeline mapping current (PCM) method. Performed combined close interval potential survey (CIPS) and direct current voltage gradient (DCVG) on multiple product pipelines. Prepare a comprehensive report including results, findings, and prioritized recommendations to address indications encountered from all survey data. Designed and drafted improvements for high priority deficiencies encountered during survey activities. Scheduled to install improvements designed.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 28

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
Marathon Petroleum
Annual CP System Evaluation and Close Interval Potential Survey/Data Integration for West Coast Pipelines, Berth 121, Amorco Terminal, and Other Fueling Terminals/Tank Farms Cathodic Protection System Evaluation, Design Improvements, & Construction/Construction Management, and MIC Analysis
Various Cities, Southern California, Washington
State, and Martinez Refinery, California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Sean Allen (732) 778-8080 / [email protected] 6 Centerpointe Drive, Bldg. #6, Ste. 500 La Palma, CA 90623

CONTACT TITLE CONTACT RESPONSIBILITY
Project Manager, Corrosion
Engineer Project manager overseeing projects related to internal corrosion, pipeline integrity, and cathodic protection.

TOTAL COST (TO DATE) START DATE COMPLETION DATE
$2,900,000 January, 2015 Ongoing

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Omidreza Moghbeli Project manager and client manager overseeing all aspects of the projects. Technical lead for data analysis, report preparation, and design work. Attended all client meetings throughout all phases of the projects.

Siamak Azimie Provided QA/QC for reports and CP system designs.

Ian Budner
Led specialized survey field efforts and data collection. Performed data analysis and report preparation. Assisted in review of all data analysis and CP system design improvement drawings/documents and preparation of design calculations and design drawings.

Carlos Pacheco Performed data tabulation and analysis. Assisted with design calculations. Drafted CP system design improvement drawings/documents.

Sebastian Borucki Field services/construction manager in charge of field logistics and data collection. Attended client meetings to discuss design submittals, field services, material procurement, and construction logistics.

Daniel Arizmendi Assisted with data collection and construction.

Dominik Borucki Assisted with data collection.

Nazila Zohadi Coordination of project budgeting and client meetings as well as administrative project support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Field Investigations & Surveys, Construction & Commissioning Services

DESCRIPTION OF SERVICES
Conducted External Corrosion Direct Assessment surveys including Close-Interval Potential Surveys (CIPS), Direct Current Voltage Gradient (DCVG) and Pipeline Current Mapping (PCM) surveys along several oil, gas, and water lines on the West Coast as well as CIPS around the perimeter of several storage tanks to assess the levels of CP for the steel tank bottoms. Collected AC and DC on/instant-off potentials measurements including sub-meter GPS coordinates at all test stations, casings, risers, and insulated flanges and collected outputs at all rectifiers. Performed soil resistivity testing utilizing the Wenner 4-Pin Method. Additionally, performed a complete CP system evaluation for the Berth 121 Tanker Terminal dock support structures as well as land-based structures. Performed data analysis, generated CIS/current mapping charts with GPS overlays, tabulated test station data, and provided a report included all findings and recommendations for their pipeline systems and reservoirs and system design improvements for both the Amorco Terminal and Berth 121 Tanker Terminal. Managed and completed CP system design improvements based on field observations and all field assessment data described above. Completed several rounds of design submittals including preparations of design documents and drawings and held meetings to discuss/incorporate the client’s review comments through each design phase. Assisted with obtaining all necessary permits, one-call utility alerts, and all other necessary notifications. Prepared all material submittals for approved CP system materials required for construction and procured all necessary materials for construction. Performed CP system surveys, designs, construction, commissioning, a follow-up survey work for multiple fueling terminals and tank farms throughout California on both impressed current and sacrificial CP systems. Performed microbiologically induced corrosion analysis on dozens of crude oil, fuel, product, water, and wastewater pipelines.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 29

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
Southern California Gas Company
(Sempra Utilities)
As-Needed Cathodic Protection System Evaluation and
Internal/External Corrosion Assessment Services for
Distribution/Transmission Pipeline Systems
Various Locations Throughout Southern California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Charles Gepford
Sam Jacobson
Kevin White
(213) 718-7759 / [email protected]
(714) 308-9483 / [email protected]
(213) 248-5581 / [email protected]
555 West 5th St.

Los Angeles, CA 90013

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Charles Gepford – Team Lead-Cathodic Protection
Sam Jacobson – Internal Corrosion P.M.

Kevin White – Corrosion Integrity Team Lead
Oversee all activities related to internal corrosion, cathodic protection, and transmission pipeline integrity.

TOTAL COSTS (TO DATE) START DATE COMPLETION DATE
$1,005,000 March, 2015 Ongoing

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Ian Budner Project manager overseeing all aspects of the project. In charge of data analysis and report preparation and was responsible as the client manager.

Omidreza Moghbeli Provide QA/QC for data analysis and reporting.

Carlos Pacheco Data tabulation/analysis and report preparation.

Sebastian Borucki In change of all field activities/data collection.

Daniel Arizmendi Assisted with field activities/data collection.

Christie Curran Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Field Investigations & Surveys

DESCRIPTION OF SERVICES
Performing complete assessment of internal/external corrosion monitoring ER probes, UT probes, Field Signature Monitoring (FSM) probes at hundreds of monitoring locations installed on gas pipeline systems throughout Southern California. Performed cathodic protection system evaluations including on/instant-off AC/DC pipe-to-soil potential measurements for pipelines and CP coupon installations throughout southern California. Collected sub-meter GPS information at all monitoring locations. Updating GPS/corrosion monitoring database on a quarterly basis and submitting DOT-compliance reports and a biannual basis. Completed various over-the-line surveys including combined CIS/DCVG and PCM. Perform complete data analysis of all monitoring and cathodic protection locations including prioritized recommendations for CP system improvements and monitoring improvements. Developing internal corrosion/external corrosion monitoring specifications.

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
Long Beach Water Department Engineering Consultant Services for the Cathodic Protection Improvement of Water & Recycled Water Systems, Phase 4 Long Beach, California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Valeri Karakanov (562) 570-2331 / [email protected] 1800 E. Wardlow Road Long Beach, CA 90807

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Project Manager/Engineer Oversees construction projects

TOTAL COSTS START DATE COMPLETION DATE
$65,000 May, 2017 September, 2017

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Omidreza Moghbeli Project manager, client manager, design preparation.

Mir Fattahi QA/QC, data, report, and design review.

Ian Budner Field data analysis, design calculations, design specification/drawing preparation.

Sebastian Borucki Field data collection and construction cost estimating.

Daniel Arizmendi Field data collection.

Nazila Zohadi Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Design Services, Field Investigations & Surveys, Construction Management

DESCRIPTION OF SERVICES
Performed assessment of existing corrosion monitoring system for several water/recycled water pipelines including test station survey (pipe-to-soil potentials), photo-documentation, collecting GPS coordinates of all existing CP system facilities, current requirement testing, and soil resistivity measurements. Prepared a preliminary CP system improvements design report including all data analysis to serve as the basis of CP system design. Completed design calculations based on field survey data and prepared design drawings and specifications for CP system improvements. Prepared preliminary construction cost estimate for installation of CP system to implement in a construction bid public bid. Currently in the construction management/bid assistance phase of the project.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 30

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
City of Burbank through
TerranearPMC
Water Well Casing/Pipeline Impressed Current Cathodic Protection System Evaluation, Design Improvements, and Installations Burbank, California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Richard Salazar (818) 861-7253 / [email protected] 3200 W. Monterey Avenue Burbank, CA 91505

CONTACT TITLE CONTACT RESPONSIBILITY
General Manager Oversees all cathodic protection, corrosion, and integrity-related operations and maintenance for the western region.

TOTAL COSTS (TO DATE) START DATE COMPLETION DATE
$195,000 October, 2015 Ongoing

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Ian Budner Project manager/client manager overseeing the project. Reviewed design documents and assisted with construction efforts.

Completed design calculations and reviewed design drawings/documents for water well casings and associated well piping.

Reza Moghbeli Provided QA/QC for data analysis, report preparation, and design.

Carlos Pacheco Assisted with data collection and performed data analysis/report preparation. Design drafting.

Sebastian Borucki Field services manager in charge of field logistics/construction management. Material procurement and construction efforts.

Daniel Arizmendi Field Services and data collection.

Christie Curran Administrative services, and safety plans/programs.

TYPE OF SERVICES PROVIDED
Engineering Services, Design Services, Construction & Commissioning Services, Corrosion Consulting Services, Field Investigations & Surveys

DESCRIPTION OF SERVICES
Performed initial cathodic protection system evaluations of seven water well casings and their associated piping including groundbed resistance testing, baseline structure-to-soil potential testing, on and instant-off structure-to-soil potential testing, and rectifier/anode output measurements. Developed a CP system evaluation report with prioritized recommendations for each of the well casing locations. Developed budgetary cost estimates for future monitoring and improvements of the existing CP systems. Prepared CP system design improvements including design calculations, drawings, and documents for two of the seven water well locations. Assisted the client in obtaining necessary dig-alerts and permits prior to commencing construction activities. Installed CP system improvements for multiple well locations and conducted subsequent testing/adjustments to the newly installed CP systems. Ucorr will perform additional monitoring and design improvements in 2018 based on their CP system evaluation report and recommendations submitted in 2017 for the remaining five water well locations. Providing continuous bi-annual CP system testing, evaluation, and rectifier adjustments.

PROJECT OWNER PROJECT TITLE(S) PROJECT LOCATION
Long Beach Water Department through Paso
Robles Tank – Brown Minneapolis Tank, Inc.

Alamitos and J. Will Johnson Reservoirs Cathodic
Protection System Improvements Long Beach, California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Chris Coelho 951-925-5022 / [email protected] 825 26th St.

Paso Robles, CA 93446

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Project Manager Oversees reservoir refurbishments and cathodic protection system installations.

TOTAL COSTS START DATE COMPLETION DATE
$96,000 October, 2017 Ongoing

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Omidreza Moghbeli Project manager and client manager.

Ian Budner Cathodic protection system data analysis.

Sebastian Borucki Cathodic protection system material procurement, installation, testing, and commissioning Daniel Arizmendi Cathodic protection system installation, testing, and commissioning Nazila Zohadi Administrative support.

TYPE OF SERVICES PROVIDED
Corrosion Consulting Services, Field Investigations & Surveys, Construction & Commissioning Services

DESCRIPTION OF SERVICES
Removal of existing cathodic protection systems including anodes and reference cells for 36 water storage reservoirs. Procurement of new reference electrodes, sacrificial anodes, and test boxes. Installation of new cathodic protection systems components and wiring for water storage reservoirs. Cathodic protection system commissioning and testing after the system has been commissioned.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 31

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
San Diego County Water Authority and
through Kiewit Infrastructure West Co.
and Filanc Construction Inc.

Miramar Pump Station Corrosion Monitoring System
Evaluation and Padre Dam Flow Control Facility Cathodic Protection System Testing
San Diego, California / El Cajon, California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Branden Willcut
Esteban Andreu-von Euw
(562) 946-1816 / [email protected]
(760) 466-0538 / [email protected]
10704 Shoemaker Avenue, SantaFe Springs, CA 90670
740 North Andreasen Dr., Escondido, CA 92029

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Project Manager/Foreman
Project Engineer
Oversees large engineering construction projects.

Oversees construction progress and subcontractors.

TOTAL COSTS START DATE COMPLETION DATE
Kiewit - $10,450
Filanc - $39,000
Kiewit - June, 2016
Filanc - October, 2017
Kiewit - February, 2017
Filanc – July, 2019

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Omidreza Moghbeli Project manager/client manager overseeing project and client communications.

Sylvia Hall QA/QC and report review.

Ian Budner Performed field data collection, data analysis, and report preparation.

Sebastian Borucki Field services, data collection, and data processing.

Daniel Arizmendi Field services/data collection.

Nazila Zohadi Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Installation Supervision, Design Services, Field Investigations & Surveys

DESCRIPTION OF SERVICES
Performed corrosion monitoring test station material procurement, testing, and commissioning for the Miramar Pump Station Rehabilitation project. Performed isolation flange and rebar isolation testing to verify proper functionality of corrosion monitoring system components. Testing including pipe-to-soil potentials, direct resistance testing, and inductive ammeter current measurements. Supervised installation of corrosion monitoring system components and provided final data analysis and reporting for all field testing.

Performed insulated flange testing, test station testing/commissioning, pipe-to-soil potential measurements, pipeline and test lead continuity testing, reference electrode testing/commissioning, anode current output measurements, CP system construction supervision, and CP system commissioning. Provided several reports through each phase of the project including photo-documentation of CP system facilities, data tabulation/analysis, GPS coordinates, and recommendations for future CP system testing and maintenance.

RELATED EXPERIENCE
www.ucorr.net Universal Corrosion Services, LLC Page 32

PROJECT OWNER PROJECT TITLE PROJECT LOCATION
California Resources Corporation 2017 CRC Annual Cathodic Protection Survey on THUMS Landside Regulated Pipeline Long Beach, California

CONTACT NAME CONTACT TELEPHONE NUMBER /EMAIL ADDRESS CONTACT ADDRESS Robert Cannon (562) 624-3441 / [email protected] 1280 Pier G Avenue Long Beach, CA 90802

CONTACT TITLE CONTACT PROJECT RESPONSIBILITY
Engineering Specialist – Cathodic Protection Oversees all corrosion/cathodic protection-related projects at the Port of Long Beach.

TOTAL COSTS START DATE COMPLETION DATE
$25,000 December, 2017 February, 2018

KEY PERSONNEL KEY PERSONNEL RESPONSIBILITIES
Omidreza Moghbeli Project manager overseeing all aspects of the project. Provided QA/QC for data analysis and report preparation and was responsible as the client manager.

Ian Budner Data analysis and report preparation.

Sebastian Borucki Field data collection/tabulation.

Daniel Arizmendi Field data collection.

Nazila Zohadi Administrative support.

TYPE OF SERVICES PROVIDED
Engineering Services, Corrosion Consulting Services, Field Investigations & Surveys

DESCRIPTION OF SERVICES
Performing test station inspection and survey including photo-documentation, AC/DC interrupted pipe-to-soil potentials, and GPS coordinates installed on DOTregulated oil and gas pipelines. Performing a complete external corrosion direct assessment (ECDA) with sub-meter GPS coordinates for DOT-regulated oil and gas pipelines including close interval potential survey (CIPS), direct current voltage gradient (DCVG) survey, and pipeline current mapping survey to assess the existing cathodic protection system, protective coatings, and stray current interference. Prepared a comprehensive integrity analysis and report including analysis of all test station data and survey data overlaid with submeter GPS coordinates. Provided prioritized recommendations to address indications encountered from all survey data and to improve the quality of protection on the oil and gas pipeline systems.

ID Task Name Duration Start
1 Project Start 0 days Fri 6/30/23
2 Data Review and Analysis 3 days Mon 7/3/233 Review all Previous Designs and Specs 1 day Mon 7/3/234 Project Schedule Update 1 day Tue 7/4/235 Kickoff meeting 1 day Wed 7/5/236 Field Survey and Testing 21 days Wed 7/5/237 Job Walk and Visual/Safety Inspection 0 days Wed 7/5/238 Cathodic Protection System Survey 11 days Thu 7/6/239 Geodatabase Preparation 1 day Fri 7/21/23 10 Data Review and Analysis 2 days Mon 7/24/2311 CP System Adjustments, if Required 2 days Wed 7/26/2312 CP System Re-Survey 5 days Fri 7/28/2313 Report Preparation 30 days Fri 8/4/2314 Preliminary Report Preparation 10 days Fri 8/4/2315 Update the Geodatabase 2 days Fri 8/18/2316 Client Review 12 days Tue 8/22/2317 Final Report Preparation 4 days Thu 9/7/2318 Cost Estimate Preparation 2 days Wed 9/13/2319 Project Complete 0 days Thu 9/14/2320 CP System Improvement Designs & Investigation 42 days Mon 7/10/2321 Design Investigation 1 day Mon 7/10/2322 Preparation of Initial Design Packages 25 days Tue 7/11/2323 Client Review 5 days Tue 8/15/2324 Initial Design Review Meeting 1 day Tue 8/22/2325 Preparation of Final Design Packages 10 days Wed 8/23/23 6/30
7/5
9/14
27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 1 3 5 7 9 11 13 15 17 25, '23 Jul 2, '23 Jul 9, '23 Jul 16, '23 Jul 23, '23 Jul 30, '23 Aug 6, '23 Aug 13, '23 Aug 20, '23 Aug 27, '23 Sep 3, '23 Sep 10, '23 Sep 1

PRELIMINARY PROJECT SCHEDULE
FOR

THE CITY OF SAN CLEMENTE'S
2023 ANNUAL CATHODIC PROTECTION SYSTEM TESTING, EVALUATION, & DESIGN PROJECT www.ucorr.net Universal Corrosion Services, LLC Page ϯϯ

COST DATA SUMMARY
Hours Fee Hours Fee Hours Fee
1 22 $3,150 22 $3,150 22 $3,150
2 285 $34,869 285 $34,869 285 $34,869
3 149 $21,970 149 $21,970 149 $21,970
4 258 $29,870 0 $0 0 $0
714 $89,859 456 $59,989 456 $59,989
Hours Budget
1) Total three-year annual survey contract price (excluding Task 4 Design Services) is estimated to be the same as the previous three-year annual survey contract executed in 2018.
2) Since Ucorr is familiar with the project CP systems/facilities through the previous annual survey contract, we reduced labor hours/costs associated with job walks, historical document review, and structuring the annual reports. 3) Tasks 2e and 2f will only be charged if CP system adjustments are determined to be required. 4) No rate increases will be applied for annual surveys conducted in subsequent years unless the prevailing wage rates are changed by the State of California.

Work detailed in the provided RFP.
6) All services will be provided on a time and materials not-to-exceed the proposed/negotiated contract price unless changes are approved in advance by a change order signed by the City of San Clemente.

Signed by: Ian Budner, President/Senior Project Manager Signature:

Date: February 2, 2023
5) The above-listed hourly rates and mileage rate will apply to any additional on-call services completed outside the Scope of $0.655/mi
$75.00/hr
$90.00/hr
$110.00/hr
Mileage
Christie Curran & Carlos Pacheco - Office Support/Drafting Daniel Arizmendi & Dominik Borucki - Technician
Sebastian Borucki - Senior Technician
CP System Testing and Evaluation Report Preparation
Field Survey and Testing
Data Review and Analysis
ANNUAL SURVEY TOTALS:
$165.00/hr
On-Call Service Rates
Ian Budner - Project Manager, Point of Contact
CP System Improvement Designs & Investigation
CONTRACT TOTALS: 1,626 $209,838
Task
No. Description Year 1 Year 2 Year 3
Omidreza Moghbeli - Senior Corrosion Engineer
Siamak Azimie - QA/QC Engineer
$135.00/hr
$175.00/hr
$175.00/hr
Carlos Pacheco - Corrosion Engineer
www.ucorr.net Universal Corrosion Services, LLC Page 34

COST DATA

EXPENSES
Ian Budner - Project Manager,
Point of Contact ($165/hr)
Siamak Azimie - QA/QC Engineer
($175/hr)
Omidreza Moghbeli - Senior
Corrosion Engineer ($175/hr)
Carlos Pacheco - Corrosion
Engineer ($135/hr)
Sebastian Borucki - Senior
Technician ($110/hr)
Daniel Arizmendi & Dominik
Borucki - Technician ($90/hr)
Christie Curran & Carlos Pacheco -
Office Support/Drafting ($75/hr)
Mileage ($0.655/mile)
Labor
Expenses
Total
Task 1: Data Review and Analysis
1a Review all Drawings, Specs/Designs, & Data 4 2 4 1,310 - 1,310 1c Project Schedule Update 1 2 405 - 405
1d Kickoff Meeting 3 3 3 130 1,350 85 1,435
TASK 1 TOTALS - 7 3 4 7 - 1 130 3,065 85 3,150
Task 2: Field Survey and Testing
2a Job Walk and Visual/Safety Inspection - - -
2b CP System Survey 44 11 88 44 3 1,440 21,620 943 22,563 2c Geodatabase Preparation 2 2 8 1,760 - 1,760
2d Data Review and Analysis 16 4 1 2,895 - 2,895
2e CP System Adjustments, if Required 12 2 12 1 260 3,345 170 3,515 2f CP System Re-Survey, if Required 8 2 16 8 1 260 3,965 170 4,135 TASK 2 TOTALS 2 21 - 88 116 52 6 1,960 33,585 1,284 34,869 Task 3: CP System Testing and Evaluation Report Preparation 3a Preliminary Report Preparation 8 8 8 48 1 10,675 - 10,675 3b Update the Geodatabase 2 2 12 1 2,375 - 2,375
3c Final Report Preparation & Client Meeting 7 7 7 24 2 130 6,995 85 7,080 3d Cost Estimate Preparation 1 8 2 1 1,840 - 1,840
TASK 3 TOTALS 18 25 15 86 - - 5 130 21,885 85 21,970
Task 4: CP System Improvement Designs & Investigation
4a Design Investigation 2 2 10 10 1 130 2,755 85 2,840
4b Preparation of Initial Design Packages 10 15 15 30 90 17,650 - 17,650 4c Initial Design Review Meeting 3 3 3 1 130 1,620 85 1,705 4d Preparation of Final Design Packages 8 5 8 15 27 7,675 7,675 TASK 4 TOTALS 21 25 28 45 10 10 119 260 29,700 170 29,870 YEAR 1 TOTAL: **Task 4 Design Services Provided in Year 1** YEAR 2 TOTAL:

YEAR 3 TOTAL:

PROJECT TOTAL:

PROJECT TASKS
TOTALS
Job walk not required as project team is already familiar with all CP systems/facilities. $209,838
$59,989
$59,989
$89,859

PROJECT TEAM LABOR HOUR BREAKDOWN
www.ucorr.net Universal Corrosion Services, LLC Page 35

STATEMENT OF COMPLIANCE
www.ucorr.net Universal Corrosion Services, LLC Page 36 Universal Corrosion Services, LLC (DBA: Ucorr) hereby declares that this proposal is in strict compliance with the Request for Proposal and Draft Professional Services Agreement and no exceptions to either are proposed.

Any supporting documentation required, related to the Request for Proposal and/or Draft Agreement will be provided upon request.

Sincerely,
Ian Budner
President/Senior Project Manager
Universal Corrosion Services, LLC (DBA: Ucorr)
10572 Acacia Street, Suite C4
Rancho Cucamonga, CA 91730
Mobile: 909-257-6301
Phone: 909-493-1350
Fax: 909-493-1380
Email: [email protected]
Ian Budner

Registration Services:: Page 1 of 2 5/6/2022 4:49:12 PM

APPLICATION FOR

PUBLIC WORKS CONTRACTOR REGISTRATION
Registration Information
Type: Public Works
Period: 07/01/2022 06/30/2024
Contractor Information
Contractor Name: UNIVERSAL CORROSION SERVICES, LLC
Trade Name: UCORR
License Type Number: 1000022288
Contractor Physical Address
Physical Business Country: United States of America Physical Business City/ Province:

RANCHO CUCAMONGA
Physical Business Address: 10572 ACACIA STREET, SUITE C4 Physical Business State: CA Physical Business Postal
Code:
91730
Contractor Mailing Address
Mailing Country: United States of America Mailing City /Province: RANCHO CUCAMONGA Mailing Address: 10572 ACACIA STREET, SUITE C4 Mailing State: CA Mailing Postal Code: 91730
Contact Info
Daytime Phone: Daytime Phone Ext.:

Mobile Phone: Business Email: [email protected]
Applicant’s Email: [email protected]
Registration Services:: Page 2 of 2
Workers’ Compensation
Professional Employer Organization (PEO)
Do you lease employees through Professional Employer Organization? No Workers’ Compensation Overview
Carrier: HARTFORD INSURANCE

COMPANY OF THE MIDWEST
Inception Date: 07/10/2017
Policyholder Name: Universal Corrosion Services,
LLC
Expiration Date: July 11, 2022
Policy Number: 72 WEC ZQ3405
Certification
Yes I certify that I do not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award I certify that the contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works.

Yes I certify that one of the following is true: (1) I am licensed by the Contractors State License Board (CSLB) in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code; or (2) my business or trade is not subject to licensing by the CSLB.

I understand refunds are not authorized
I, Ian Budner, the undersigned, am , UNIVERSAL CORROSION SERVICES, LLC with the authority to act for and on behalf of the above named contractor. I certify under penalty of perjury that all of the above information provided is true and correct. I further acknowledge that any untruthful information provided in this application could result in the certification being canceled.

I certify this on: 4:47 PM
Legal Entity Information
Legal Entity Type: LLC
Name: UNIVERSAL CORROSION SERVICES, LLC

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:

CONTACT
(A/C, No):

FAX
E-MAIL
ADDRESS:

PRODUCER
(A/C, No, Ext):

PHONE

INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOS ONLY AUTOS

NON-OWNED

OWNED SCHEDULED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER

OTH- STATUTEPER
(MM/DD/YYYY) LIMITS POLICY EXP (MM/DD/YYYY)

POLICY EFF LTR TYPE OF INSURANCE POLICY NUMBER INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR

CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $

DAMAGE TO RENTED
PREMISES (Ea occurrence) $

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PROJECT LOC

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY

MASTER CERTIFICATE
INCIDENT LIMIT 2,000,000
POLICY AGG 2,000,000
EV20182138 7/10/2022 7/10/2023 Professional Liability A 1,000,000
1,000,000
1,000,000
✘
B Y 72WECAG0P87 5/24/2022 5/24/2023
3,000,000
3,000,000
EX20182139 7/10/2022 7/10/2023
✘
A ✘
2,000,000
2,000,000
2,000,000
5,000
1,000,000
2,000,000
EV20182138 7/10/2022 7/10/2023
✘
✘
A
PROPERTY & CAS INS CO OF HARTFORD 34690
CAPITOL SPECIALTY INS CORP 10328
RANCHO CUCAMONGA CA 91730-5445
10572 ACACIA ST, Unit #C4

UNIVERSAL CORROSION SERVICES, LLC
[email protected]
909-784-2292 (909) 538-8892
Alex Aguayo
POMONA CA 91766
300 S PARK AVE, SUITE 903
THINK Ins & Fin Svs, LLC
2/23/2023