AGENDA ITEM: 4-A

STAFF REPORT

SAN CLEMENTE ZONING ADMINISTRATOR
Meeting Date: October 19, 2023
PLANNER: John Ciampa, Contract Planner
SUBJECT: City Antenna Permit | CAP 23-103 | DISH Wireless Facility, A request to install antennas and equipment on an existing ball field light standard and in an existing equipment enclosure in the Open Space Public (OS1) zone and find the project categorically exempt from the California Environmental Act under Section 15301 of the CEQA Guidelines (14 CCR§ 15301, Class 1e: Existing Facilities) and Section 15303 of the CEQA Guidelines (14 CCR§ 15303, Class 3: New Construction or Conversion of Small Structures).

LOCATION: 2916 Via San Gorgonio

ZONING/GENERAL
PLAN:

Public Open Space and Costal Zone Overlay District (OS1-CZ) PROJECT SUMMARY:
x Background: The project site is the 18.83 acre San Gorgonio City Park that is improved with playgrounds, bathrooms, tennis courts, and baseball fields. The park has two active wireless facilities located on light standards with screened ground mounted equipment. The ball field light standard and the ground mounted equipment enclosure proposed for the project were decommissioned as a wireless facility over a year ago and a new City Antenna Permit (CAP) must be obtained for the proposed project (per Section 17.12.150 Expiration of Approvals).

Figure 1-Existing Site Conditions
$77$&+0(17
DISH Wireless Facility Page 2
x Proposed Project: The applicant proposes to install new antennas and equipment on an existing ball field light standard and new ground-mounted equipment within an existing enclosure that is attached to the public restrooms. The improvements proposed for wireless telecommunication facility includes new equipment at the height of 67 feet on the existing 79-foot, five-inches tall light standard which is the same height as the previous equipment.
x The flush mounted antenna and equipment on the light standard is consistent with the Wireless Master Plan’s (WMP) pre-approved design (Attachment 5) and with the other two wireless facilities in the park. The light standard equipment includes six-panel antennas, six pipe mounts, and 12 remote radio heads that would be painted to match the light standard.
x The ground mounted equipment within the enclosure includes cabinets, power conduit, conduit and fiber box, GPS unit, and meter socket. x On April 12, 2023, the DRSC (Attachment 4) reviewed the application and supported the proposed project design because the flush mounted equipment on the light standard is consistent with the pre-approved design for the Wireless Master Plan.
x Approval Authority: Zoning Ordinance Section 17.16.130 requires Zoning Administrator approval of a City Antenna Permit (CAP) to allow a telecommunication facility on City property.
x Project Re-Noticed: The Zoning Administrator previously considered this item at the August 17, 2023 public hearing. However, staff discovered after the fact that the noticing materials were published but not mailed to the appropriate radius. Staff has re-published and mailed notices for this de-novo public hearing on this item. The project details and staff recommendation remain the same as presented in the staff report dated August 17, 2023.
x Project Findings: Staff supports the proposed request for the City Antenna Permit and the project meets the required finding because:
x The maximum height for structures in the OS1 zone is subject to the discretionary review. The height of the proposed wireless facility is not increasing the height of the existing light standard and is consistent with similar adjacent wireless facilities at San Gorgonio Park and the pre-approved design of the WMP; x The design and location of the wireless facility will not interfere with the transmission or reception of other signals in the City, which are also protected by Conditions of Approval 7.18 and 7.19;
x The project does not create adverse visual impacts to the surrounding area or the City at large because the flush mounted wireless equipment is consistent with the WMP and the existing wireless facilities at the Park. The equipment on the light standard will be painted to blend in with the light standard; x The flush mounted wireless equipment on the light standard is consistent with the pre-approved design concepts for the City properties as identified in the Wireless Master Plan.

DISH Wireless Facility Page 3
x CEQA: The project is Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 of the CEQA Guidelines (14 CCR§ 15301, Class 1e: Existing Facilities) and Section 15303 of the CEQA Guidelines (14 CCR§ 15303, Class 3: New Construction or Conversion of Small Structures) because:
x The project involves the installation of new wireless equipment to an existing light standard and the addition of new ground mounted equipment within an existing equipment enclosure.
x The project design is consistent with the City’s pre-approved design for the WMP for ball field light standards.
x The project will not result in a cumulative impact from successive projects of the same type in the same place, over time. There are no unusual circumstances surrounding the project that result in a reasonably possibility of a significant effect on the environment.
x Public Comment: No public comments have been received on this item.

RECOMMENDATION
Staff recommends that the Zoning Administrator:

1. Determine the project is Categorically Exempt from the requirements of the CEQA pursuant to CEQA Guidelines Section 15301 of the CEQA Guidelines (14 CCR§ 15301, Class 1e: Existing Facilities) and Section 15303 of the CEQA Guidelines (14 CCR§ 15303, Class 3: New Construction or Conversion of Small Structures); and

2. Adopt Resolution ZA 23-014, approving City Antenna Use Permit 23-103, DISH Wireless Facility, subject to attached conditions of approval.

Attachments:

1. Resolution ZA 23-014
Exhibit A - Conditions of Approval

2. Location Map

3. Photo simulations

4. DRSC minutes, 4-12-2023

5. Wireless Master Plan Pre-Approved Light Standard Designs for San Gorgonio Park and Appendix B (Light Standard Designs)

6. EME/RF Analysis

7. Plans
RESOLUTION NO. ZA 23-014

A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE

CITY OF SAN CLEMENTE, CALIFORNIA, APPROVING CITY
ANTENNA PERMIT 23-103, DISH WIRELESS FACILITY, TO

ALLOW THE INSTALLATION OF ANTENNAS AND

EQUIPMENT ON AN EXISTING BALL FIELD LIGHT

STANDARD AND IN AN EXISTING EQUIPMENT
ENCLOSURE, LOCATED AT 2916 VIA SAN GORGOINO, AND

FINDING THE PROJECT IS CATEGORICALLY EXEMPT

FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
UNDER SECTION 15301 OF THE CEQA GUIDELINES (14
CCR§ 15301, CLASS 1e: EXISTING FACILITIES) AND
SECTION 15303 OF THE CEQA GUIDELINES (14 CCR§
15303, CLASS 3: NEW CONSTRUCTION OR CONVERSION

OF SMALL STRUCTURES)

WHEREAS, on March 22, 2023, an application was submitted by Peter Blied, for City Antenna Permit (CAP) 23-103, and deemed complete on July 14, 2023 to install antennas and equipment on an existing ball field light standard and in an existing equipment enclosure located at 2916 Via San Gorgonio, within the in the Open Space Public (OS1) zone. The site’s legal description is portion of parcel 17 Record of Survey Book 4

Page 15 ends

WHEREAS, the Planning Division has completed an initial environmental assessment of the above matter in accordance with the California Environmental Quality Act (CEQA) and recommends the Zoning Administrator determine the project is categorically exempt from CEQA pursuant to State CEQA Guidelines Section 15301 of the CEQA Guidelines (14 CCR§ 15301, Class 1e: Existing Facilities) and Section 15303 of the CEQA Guidelines (14 CCR§ 15303, Class 3: New Construction or Conversion of Small Structures). This is recommended because the request is limited to the installation of new wireless equipment on an existing ball field light standard and ground mounted equipment within an abandoned equipment enclosure; and
WHEREAS, the Development Management Team (DMT) reviewed the proposed project, and staff issued a comment letter on June 29, 2023 to the applicant to ensure compliance with General Plan, Zoning Ordinance, and other applicable City ordinances, codes, and policies;
WHEREAS, on August 17, 2023, the Zoning Administrator of the City of San Clemente held a public hearing on the subject application; however staff discovered that the printed noticing materials were not correctly mailed out to the appropriate radius surrounding the subject property; and
WHEREAS, notices were published and mailed correctly to alert the public of a denovo public hearing on this item scheduled for October 19, 2023; and Resolution No. ZA 23-014 Page 2
Whereas on October 19, 2023, the Zoning Administrator of the City of San Clemente held a public hearing on the subject application and considered written and oral comments, and facts and evidence presented by the applicant, City staff, and other interested parties.

NOW, THEREFORE, The Zoning Administrator of the City of San Clemente does hereby resolve as follows:

Section 1. Incorporation of Recitals.

The Zoning Administrator hereby finds that all of the facts in the Recitals are true and correct and are incorporated and adopted as findings of the Zoning Administrator as fully set forth in this resolution.

Section 2. CEQA Findings.

Based upon its review of the entire record, including the Staff Report, any public comments or testimony presented to the Zoning Administrator, and the facts outlined below, the Zoning Administrator hereby finds and determines that the proposed project is Categorically Exempt from CEQA pursuant to State CEQA Guidelines 15301 (14 CCR§ 15301, Class 1e: Existing Facilities) and 15303 (14 CCR§ 15303, Class 3: New Construction or Conversion of Small Structures).

Furthermore, none of the exceptions to the use of the Class 1 and 3 categorical exemptions identified in State CEQA Guidelines section 15300.2 apply. The project will not result in a cumulative impact from successive projects of the same type in the same place, over time. There are no unusual circumstances surrounding the project that result in a reasonably possibility of a significant effect on the environment. The project is not in a scenic corridor, will not alter or impact historic resources, and does not include any hazardous waste sites. The project consists of the install of antennas and equipment on an existing ball field light standard and in an existing equipment enclosure. Thus, the Class 1 and 3 exemptions applies, and no further environmental review is required.

Section 3. City Antenna Permit Findings
With respect to City Antenna Permit (CAP) 23-103, the Zoning Administrator finds as follows:

A. The proposed project complies with the height limitations of the zoning district in which the project is proposed, in that:

1. The maximum height for structures in the OS1 zone is subject to the discretionary review and the project height is consistent with the previous wireless facility on the light standard and the design requirements of the Wireless Master Plan; and

2. The height of the proposed wireless facility is consistent with adjacent wireless facilities at San Gorgonio Park; and
Resolution No. ZA 23-014 Page 3

3. The facility is compatible with adjacent land uses, as required by Policy 9-2 of the Public Services, Facilities, and Utilities Element of the General Plan, because it is sited on public property serving an industrial use, and it is painted to match the color of the light standard to comply with the requirements of the Wireless Master Plan; and

4. The development of a wireless facility at this location was anticipated by the City’s 2008 Wireless Master Plan WMP.

B. The proposed project does not interfere with the transmission or reception of other signals in the City, in that:

1. The design and location of the wireless facility will not interfere with the transmission or reception of other signals in the City, which are also protected by Conditions of Approval 7.18 and 7.19; and

2. The proposed wireless facility will improve phone and internet service and coverage for members of the public in the vicinity; and

3. The antennas do not interfere with the transmission or reception of other signals in the City according to the technical evidence provided by the applicant. DISH Wireless operates on its own frequency that should not affect the City’s Supervisory Control and Data Acquisition radio system or any other transmission or reception equipment; and

4. The transmission or reception of the signal has not been demonstrated to pose a threat to the public health or safety. The applicant provided an electromagnetic energy / radio frequency (EME/RF) report to validate operations within allowed FCC bounds.

C. The proposed project does not create adverse visual impacts to the surrounding area or to the City at large, in that:

1. The project does not create adverse visual impacts to the surrounding area or the City at large because the flush mounted wireless equipment is consistent with the Wireless Master Plan and the existing wireless facilities at the Park; and

2. The development of a wireless facility at this location was anticipated by the City’s 2008 Wireless Master Plan WMP; and

3. The proposed antennas do not create adverse visual impacts to the surrounding area or to the City at large as determined by the City’s Design Review Subcommittee.

Resolution No. ZA 23-014 Page 4
D. The proposed project is consistent with the pre-approved design concepts for City properties identified in the City of San Clemente Wireless Master Plan, in that:

1. The flush mounted wireless equipment on the light standard will be painted to match the color of the light standard and is consistent with the preapproved design concepts for the City properties as identified in the Wireless Master Plan; and

2. The project was determined by the City through the Design Review Subcommittee’s review of the proposed flush mounted equipment on the ball field light standard and ground mounted equipment with the existing enclosure to be consistent with the Wireless Master Plan.

Section 4. Zoning Administrator Approval.

Based on the foregoing recitals and findings, and the written and oral comments, facts, and evidence presented, the City of San Clemente Zoning Administrator approves City Antenna Permit 23-103, DISH Wireless Facility, subject to the Conditions of Approval set forth in Exhibit A.

PASSED AND ADOPTED at a regular meeting of the City of San Clemente Zoning Administrator on October 19, 2023.
______________________________________
Adam Atamian, Zoning Administrator
Resolution No. ZA 23-014 EXHIBIT A

CONDITIONS OF APPROVAL
CITY ANTENNA PERMIT 23-103

DISH WIRELESS FACILITY

1.0 GENERAL CONDITIONS OF APPROVAL

1.1 Within 30 days of approval of this application, the applicant shall submit to the City Planner a signed acknowledgement concurring with all conditions of approval on a form to be provided by the City.

Failure to submit this acknowledgement may be grounds to revoke this approval.

Planning

1.2 The applicant shall defend, indemnify, and hold harmless the City of San Clemente and its officers, employees, and agents from and against any claim, action, proceeding, fines, damages, expenses, and attorneys’ fees, against the City, its officers, employees, or agents to attack, set aside, void, or annul any approval or condition of approval of the City concerning this project, including but not limited to any approval or condition of approval of the City Council, Planning Commission, or City Planner. Applicant shall pay all costs, The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officers, employees, and agents in the defense of the matter. If the applicant fails to so defend the matter, the City shall have the right, at its own option, to do so and, if it does, the applicant shall promptly pay the City's full cost of the defense.

Planning

1.3 Use and development of this property shall be in substantial conformance with the approved plans, material boards and other applicable information submitted with this application, and with these conditions of approval.

Planning

1.4 The applicant shall comply with all applicable current and future provisions of the San Clemente Municipal Code, adopted
ordinances, and state laws.

All

1.5 1.6
The entitlements approved herein shall be deemed to have expired if within three years of approval the project is not commenced, or the project permitted by the approved application has lapsed, as defined by Zoning Ordinance Section 17.12.150.

The Applicant (including any property owners and managers, and their designees) shall be responsible for ensuring that if this wireless facility becomes inactive, the applicant will be responsible for removing all of the equipment at their expense. The removal shall take place no more than 90 (ninety) days after the wireless facility ceases to be utilized for the provision of wireless signal Planning
Planning
**
Resolution No. ZA 23-014, Exhibit A Page 2
transmission.

4.0 4.1

4.2 4.3

4.4 4.5

7.0 PRIOR TO ISSUANCE OF BUILDING PERMITS
Prior to the issuance of a Building Permit the applicant shall obtain an encroachment permit for work and staging within the San Gorgonio Park and parking lot to allow the coordination and work in the park area.

The working drawings shall include within the first four pages a list of all conditions of approval included in this resolution.

The applicant shall demonstrate to the City Planner that the project has secured approval from the California Coastal Commission.

The project proponent must enter into a lease agreement with the City prior to erecting any antenna and the duration of the development is subject to terms within that lease agreement. The City Council shall review the proposed terms and determine whether to enter into said lease agreement.

The Antennas shall be painted to match the light standard and cables shall be concealed inside the light standard.

OPERATIONAL CONDITIONS OF APPROVAL

ENG
**
Planning
Planning
Planning
**
Planning
**

7.16 The carrier shall comply with applicable Federal Communications Commission (FCC) requirements, per the Radio Frequency (RF) study, including, but not limited to requirements related to permissible levels of radio frequency emissions.

Planning
**

7.17 To prevent exposures in excess of the FCC guidelines, no access within 10 feet directly in front of the antennas (horizontal plane of antenna) should be allowed while the base station is in operation, unless other measures can be demonstrated to ensure that occupational protection requirements are met.

Planning
**

7.18 The carrier shall provide in writing that the proposed antennas do not interfere with the transmission or reception of the City SCADA communication system and other communication equipment.

Planning
**

7.19 The cellular communication facility shall not interfere with the function and operation of any utility communication equipment (e.g. City SCADA system) or control signals. If interference is found to be caused by the communication facility, the operator shall follow the FCC process to mitigate and resolve the issues. If Planning
**
Resolution No. ZA 23-014, Exhibit A Page 3
project modifications are necessary, the changes shall be reviewed and approved in compliance with the Zoning Ordinance and other applicable regulations.

7.20 7.21
The carrier shall allow other carriers to collocate at the cellular facility with antennas placed on the ball field light standard.

Cellular Carrier shall report without delay any damage to City equipment or property and shall be held responsible for the replacement of any such damage caused by construction
activities.

Planning
**
Planning
**

7.22 The Applicant (including any property owners and managers, and their designees) shall ensure all equipment, walls, and fences are maintained in compliance with the approved plans.

Planning
**

7.23 The Applicant (including any property owners and managers, and their designees) shall ensure that discharge of washwater and other pollutants is prohibited from entering the storm drain system.

Applicant must prevent pollutants (e.g. sediment, trash, food waste etc.) and any washwater used during cleanup from entering the storm drain system.

Code
Comp
**

7.24 The Applicant (including any property owners and managers, and their designees) shall be responsible for ensuring that no noisegenerating maintenance activities on the subject property are conducted between the hours of ten (10:00) p.m. and seven (7:00) a.m. [Citation - Section 8.48.070(P) of the SCMC] If emergency repairs are required during these standard quiet hours to mitigate storm damage, a safety hazard, or other unforeseen event, the Applicant shall inform the City in writing (Planning@sanclemente.org) of the emergency repairs.

Code
Comp
**
*
**
Denotes a modified Standard Condition of Approval
Denotes a project-specific Condition of Approval

AVENIDA VAQUERO
VIA
SA
N

JACINTO
VIA

SAN GORGONIO
5 AVENIDA VAQUERO

CALLE VISTA TORITO

VIA CORBINA

VIA SAN JACINTO

VIA SAN GORGONIO

CALLE BARA
NDA

CALLE FRONT

CALLE JUAREZ
5 CALLE VISTA TORITO

VIA ARBOLEDA

VIA CASA

VIA MON

A MONTEGO

AVENIDA VAQUERO

CALLEVISTATORITO
A
OTRITO
T

VIA COVIA CORBINA

VIA SAN JAC

JACINTO

VIA SAN GORGONIO

AVENIDA
ID

VAQUERO
VIA
SA
N

JACINTOJACINTO
VIA
SAN

GORGONIO
5 CALLE VISTAT
ISTA T
V

ORITOORITO

VIA ARBOLEVIA ARBOLEDA

VIACASA

VIA MON

AMONTEGO

CALLE BARA
NDA

CALLE FRON
RONT

CALLE JUAREZ
5 &LW\RI6DQ&OHPHQWH&RPPXQLW\0DS
&LW\ RI 5LYHUVLGH &RXQW\ RI 5LYHUVLGH (VUL +(5( *DUPLQ L3& 0D[DU (DJOH$HULDO
3DUFHO/DEHOV
3DUFHOV
&RDVWDO&DQ\RQ
&RDVWDO%OXII
:RUOG%RXQGDULHVDQG3ODFHV
&LW\%RXQGDU\
(DJOHIW7LOHG

5HG
%DQGB
*UHHQ
%DQGB
%OXH
%DQGB



30
    PL
    NP


:HE$SS%XLOGHUIRU$UF*,6
(DUWKVWDU*HRJUDSKLFV_(DJOH$HULDO_67/8_(VUL_(VUL+(5(*DUPLQ_ $77$&+0(17
$77$&+0(17

$77$&+0(17

City of San Clemente
Wireless Master Plan Pre-Approved Designs for City Properties 33 Site 3. San Gorgonio Park
Light Standard Design
San Gorgonio Park has multiple ball field light
poles that can be replaced as a single carrier
per pole. The design should minimize the
appearance of the antennas to the best
possible extent.

Existing Verizon and
T-Mobile locations -
utilizing ball field light
standards.

In the case of San Gorgonio
Park, a stealth mono-tree may
draw more attention to itself
than flush-mounting antennas
on one of the park’s 18 ball
field light standard.

The accompanying base station
equipment can be located in an
enclosure (12’Wx18’Lx9’H) adjacent
to the park’s restroom / storage
building and designed to match the
color and texture of the existing
building’s façade. Equipment
enclosure or building should be built
at a size that would accommodate a
multiple number of carriers.
$77$&+0(17

Radio Frequency - Electromagnetic Energy
(RF-EME) Jurisdictional Report
Site No. LSSNA01191A
2916 Via Gorgonio
San Clemente, California 92624
33° 26' 59.70'' N, -117° 38' 31.42'' W NAD83
EBI Project No. 6221006037
October , 2021
Prepared for:

Dish Wireless
Prepared by:
$77$&+0(17
RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting

TABLE OF CONTENTS
EXECUTIVE SUMMARY .................................................................................................................... 1

1.0 INTRODUCTION .................................................................................................................... 2

2.0 SITE DESCRIPTION ............................................................................................................... 2

3.0 WORST-CASE PREDICTIVE MODELING ................................................................................ 3

4.0 MITIGATION/SITE CONTROL OPTIONS ............................................................................... 4

5.0 SUMMARY AND CONCLUSIONS ............................................................................................ 5

6.0 LIMITATIONS ........................................................................................................................ 5

APPENDICES

APPENDIX A CERTIFICATIONS

APPENDIX B RADIO FREQUENCY ELECTROMAGNETIC ENERGY SAFETY / SIGNAGE PLANS

APPENDIX C FEDERAL COMMUNICATIONS COMMISSION (FCC) REQUIREMENTS

REFERENCE DOCUMENTS (NOT ATTACHED)
CDS: LSSNA01191A_ZD_20210712090537
RFDS: RFDS-LSSNA01191A-PRELIMINARY-20210429-V.1_20210429103449 RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 1

EXECUTIVE SUMMARY
Purpose of Report
EnviroBusiness Inc. (dba EBI Consulting) has been contracted by Dish Wireless to conduct radio frequency electromagnetic (RF-EME) modeling for Dish Wireless Site LSSNA01191A located at 2916 Via Gorgonio in San Clemente, California to determine RF-EME exposure levels from proposed Dish Wireless communications equipment at this site. As described in greater detail in Appendix C of this report, the Federal Communications Commission (FCC) has developed Maximum Permissible Exposure (MPE) Limits for the general public and for occupational activities. This report summarizes the results of RF-EME modeling in relation to relevant FCC RF-EME compliance standards for limiting human exposure to RFEME fields.

Statement of Compliance
A site is considered out of compliance with FCC regulations if there are areas that exceed the FCC exposure limits and there are no RF hazard mitigation measures in place. Any carrier which has an installation that contributes more than 5% of the applicable MPE must participate in mitigating these RF hazards.

As presented in the sections below, based on worst-case predictive modeling, there are no modeled areas on any accessible rooftop or ground-level walking/working surface related to the proposed antennas that exceed the FCC’s occupational or general public exposure limits at this site.

At the nearest walking/working surfaces to the Dish Wireless antennas, the maximum power density generated by the DISH antennas is approximately 1.77 percent of the FCC’s general public limit (0.35 percent of the FCC’s occupational limit).

The composite exposure level from all carriers on this site is approximately 1.77 percent of the FCC’s general public limit (0.35 percent of the FCC’s occupational limit) at the nearest walking/working surface to each antenna.

Recommended control measures are outlined in Section 4.0 and within the Site Safety Plan (attached); Dish Wireless should also provide procedures to shut down and lockout/tagout this wireless equipment in accordance with their own standard operating protocol. Non-telecom workers who will be working in areas of exceedance are required to contact Dish Wireless since only DISH has the ability to lockout/tagout the facility, or to authorize others to do so.

RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 2

1.0 INTRODUCTION
Radio frequency waves are electromagnetic waves from the portion of the electromagnetic spectrum at frequencies lower than visible light and microwaves. The wavelengths of radio waves range from thousands of meters to around 30 centimeters. These wavelengths correspond to frequencies as low as 3 cycles per second (or hertz [Hz]) to as high as one gigahertz (one billion cycles per second).

Personal Communication (PCS) facilities used by Dish Wireless in this area will potentially operate within a frequency range of 600 to 5000 MHz. Facilities typically consist of: 1) electronic transceivers (the radios or cabinets) connected to wired telephone lines; and 2) antennas that send the wireless signals created by the transceivers to be received by individual subscriber units (PCS telephones). Transceivers are typically connected to antennas by coaxial cables.

Because of the short wavelength of PCS services, the antennas require line-of-site paths for good propagation, and are typically installed a distance above ground level. Antennas are constructed to concentrate energy towards the horizon, with as little energy as possible scattered towards the ground or the sky. This design, combined with the low power of PCS facilities, generally results in no possibility for exposure to approach Maximum Permissible Exposure (MPE) levels, with the exception of in areas in the immediate vicinity of the antennas.

MPE limits do not represent levels where a health risk exists, since they are designed to provide a substantial margin of safety. These limits apply for continuous exposures and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size or health.

2.0 SITE DESCRIPTION
This project site includes the following proposed wireless telecommunication antennas on a monopole located at 2916 Via Gorgonio in San Clemente, California.

Ant #
Operator
Antenna Make
Antenna Model
Frequency (MHz)
Azimuth (deg.)
Mechanical
Downtilt (deg.)
Horizontal
Beamwidth
(Degrees)
Aperture (feet)
Total Power Input
(Watts)
Gain (dBd)*
Total ERP (Watts)
Total EIRP (Watts)
1 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 02DT 600 600 340 0 71 6.0 120 19.25 8998.73 14757.92 1 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2100 2100 340 0 67 6.0 160 24.05 36234.31 59424.27 1 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2300 2300 340 0 63 6.0 160 24.05 36234.31 59424.27 2 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 02DT 600 600 340 0 71 6.0 120 19.25 8998.73 14757.92 2 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2100 2100 340 0 67 6.0 160 24.05 36234.31 59424.27 2 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2300 2300 340 0 63 6.0 160 24.05 36234.31 59424.27 3 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 02DT 600 600 100 0 71 6.0 120 19.25 8998.73 14757.92 3 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2100 2100 100 0 67 6.0 160 24.05 36234.31 59424.27 3 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2300 2300 100 0 63 6.0 160 24.05 36234.31 59424.27 4 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 02DT 600 600 100 0 71 6.0 120 19.25 8998.73 14757.92 4 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2100 2100 100 0 67 6.0 160 24.05 36234.31 59424.27 4 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 01DT 2300 2300 100 0 63 6.0 160 24.05 36234.31 59424.27 5 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 04DT 600 600 220 0 71 6.0 120 19.25 8998.73 14757.92 5 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 03DT 2100 2100 220 0 66 6.0 160 24.05 36234.31 59424.27 5 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 03DT 2300 2300 220 0 63 6.0 160 24.05 36234.31 59424.27 6 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 04DT 600 600 220 0 71 6.0 120 19.25 8998.73 14757.92 6 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 03DT 2100 2100 220 0 66 6.0 160 24.05 36234.31 59424.27 RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 3 6 Dish CELLMAX CMA-UBTULBULBHH-6516-16-21-21 03DT 2300 2300 220 0 63 6.0 160 24.05 36234.31 59424.27 • Note there are 2 Dish Wireless antennas per sector at this site. For clarity, the different frequencies for each antenna are entered on separate lines.
• Gain includes antenna and combiner.

Ant # NAME X Y
Antenna
Radiation
Centerline
Z-Height
Ground
1 Dish 1.0 3.2 55.0 55.0
2 Dish 6.7 5.1 55.0 55.0
3 Dish 12.7 0.0 55.0 55.0
4 Dish 11.5 5.8 55.0 55.0
5 Dish 4.4 8.7 55.0 55.0
6 Dish 0.4 4.8 55.0 55.0
• Note the Z-Height represents the distance from the antenna centerline in feet.

The above tables contain an inventory of proposed Dish Wireless antennas and other carrier antennas if sufficient information was available to model them. Note that EBI uses an assumed set of antenna specifications and powers for unknown and other carrier antennas for modeling purposes. The FCC guidelines incorporate two separate tiers of exposure limits that are based upon occupational/controlled exposure limits (for workers) and general population/uncontrolled exposure limits for members of the general public that may be exposed to antenna fields. While access to this site is considered uncontrolled, the analysis has considered exposures with respect to both controlled and uncontrolled limits as an untrained worker may access adjacent rooftop locations. Additional information regarding controlled/uncontrolled exposure limits is provided in Appendix C. Appendix B presents a site safety plan that provides a plan view of the monopole with antenna locations.

3.0 WORST-CASE PREDICTIVE MODELING
EBI has performed theoretical MPE modeling using RoofMaster™ software to estimate the worst-case power density at the site’s nearby broadcast levels resulting from operation of the antennas. RoofMaster™ is a widely-used predictive modeling program that has been developed by Waterford Consultants to predict RF power density values for rooftop and tower telecommunications sites produced by vertical collinear antennas that are typically used in the cellular, PCS, paging and other communications services.

Using the computational methods set forth in Federal Communications Commission (FCC) Office of Engineering & Technology (OET) Bulletin 65, “Evaluating Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields” (OET-65), RoofMaster™ calculates predicted power density in a scalable grid based on the contributions of all RF sources characterized in the study scenario.

At each grid location, the cumulative power density is expressed as a percentage of the FCC limits.

Manufacturer antenna pattern data is utilized in these calculations. RoofMaster™ models consist of the Far Field model as specified in OET-65 and an implementation of the OET-65 Cylindrical Model (Sula9).

The models utilize several operational specifications for different types of antennas to produce a plot of spatially-averaged power densities that can be expressed as a percentage of the applicable exposure limit.

For this report, EBI utilized antenna and power data provided by Dish Wireless and compared the resultant worst-case MPE levels to the FCC’s occupational/controlled exposure limits outlined in OET Bulletin 65. The assumptions used in the modeling are based upon information provided by Dish Wireless and information gathered from other sources. Elevations of walking/working surfaces were estimated based on elevations provided and available aerial imagery. Sector orientation assignments were made assuming coverage is directed to areas of site. Changes to antenna mount heights or placement will impact RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 4 site compliance. The parameters used for modeling are summarized in the Site Description antenna inventory table in Section 2.0.

There are no other wireless carriers with equipment installed at this site.

Based on worst-case predictive modeling, there are no modeled areas on any accessible rooftop or ground-level walking/working surface related to the proposed Dish Wireless antennas that exceed the FCC’s occupational or general public exposure limits at this site. At the nearest walking/working surfaces to the Dish Wireless antennas, the maximum power density generated by the Dish Wireless antennas is approximately 1.77 percent of the FCC’s general public limit (0.35 percent of the FCC’s occupational limit). The composite exposure level from all carriers on this site is approximately 1.77 percent of the FCC’s general public limit (0.35 percent of the FCC’s occupational limit) at the nearest walking/working surface to each antenna.

The Site Safety Plan also presents areas where Dish Wireless antennas contribute greater than 5% of the applicable MPE limit for a site. A site is considered out of compliance with FCC regulations if there are areas that exceed the FCC exposure limits and there are no RF hazard mitigation measures in place. Any carrier which has an installation that contributes more than 5% of the applicable MPE must participate in mitigating these RF hazards.

The inputs used in the modeling are summarized in the Site Description antenna inventory table in Section

2.0. A graphical representation of the RoofMaster™ modeling results is presented in Appendix B.

Microwave dish antennas are designed for point-to-point operations at the elevations of the installed equipment rather than ground level coverage. The maximum power density generated by all carrier antennas, including microwaves and panel antennas, is included in the modeling results presented within this report.

4.0 MITIGATION/SITE CONTROL OPTIONS
EBI’s modeling indicates that there are no areas in front of the Dish Wireless antennas that exceed the FCC standards for occupational or general public exposure. All exposures above the FCC’s safe limits require that individuals be elevated above the ground. In order to alert people accessing the monopole, a Warning sign and an NOC Information sign are recommended for installation 10 feet above ground level at the base of the monopole.

Barriers are recommended for installation when possible to block access to the areas in front of the antennas that exceed the FCC general public and/or occupational limits. Barriers may consist of rope, chain, or fencing. Painted stripes should only be used as a last resort. There are no barriers recommended on this site.

These protocols and recommended control measures have been summarized and included with a graphic representation of the antennas and associated signage and control areas in a RF-EME Site Safety Plan, which is included as Appendix B. Individuals and workers accessing the monopole should be provided with a copy of the attached Site Safety Plan, made aware of the posted signage, and signify their understanding of the Site Safety Plan.

To reduce the risk of exposure, EBI recommends that access to areas associated with the active antenna installation be restricted and secured where possible.

Implementation of the signage recommended in the Site Safety Plan and in this report will bring this site into compliance with the FCC’s rules and regulations.

RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 5

5.0 SUMMARY AND CONCLUSIONS
EBI has prepared a Radiofrequency – Electromagnetic Energy (RF-EME) Compliance Report for telecommunications equipment installed by Dish Wireless Site Number LSSNA01191A located at 2916 Via Gorgonio in San Clemente, California to determine worst-case predicted RF-EME exposure levels from wireless communications equipment installed at this site. This report summarizes the results of RFEME modeling in relation to relevant Federal Communications Commission (FCC) RF-EME compliance standards for limiting human exposure to RF-EME fields.

As presented in the sections above, based on the FCC criteria, there are no modeled areas on any accessible rooftop or ground-level walking/working surface related to the proposed antennas that exceed the FCC’s occupational or general public exposure limits at this site.

Workers should be informed about the presence and locations of antennas and their associated fields.

Recommended control measures are outlined in Section 4.0 and within the Site Safety Plan (attached); Dish Wireless should also provide procedures to shut down and lockout/tagout this wireless equipment in accordance with their own standard operating protocol. Non-telecom workers who will be working in areas of exceedance are required to contact Dish Wireless since only Dish Wireless has the ability to lockout/tagout the facility, or to authorize others to do so.

6.0 LIMITATIONS
This report was prepared for the use of Dish Wireless. It was performed in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same locale under like circumstances. The conclusions provided by EBI are based solely on the information provided by the client. The observations in this report are valid on the date of the investigation. Any additional information that becomes available concerning the site should be provided to EBI so that our conclusions may be revised and modified, if necessary. This report has been prepared in accordance with Standard Conditions for Engagement and authorized proposal, both of which are integral parts of this report. No other warranty, expressed or implied, is made.

RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Appendix A
Certifications
RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Preparer Certification
I, Colin Mounce, state that:
ƒ I am an employee of EnviroBusiness Inc. (d/b/a EBI Consulting), which provides RF-EME safety and compliance services to the wireless communications industry. ƒ I have successfully completed RF-EME safety training, and I am aware of the potential hazards from RF-EME and would be classified “occupational” under the FCC regulations. ƒ I am fully aware of and familiar with the Rules and Regulations of both the Federal Communications Commissions (FCC) and the Occupational Safety and Health Administration (OSHA) with regard to Human Exposure to Radio Frequency Radiation.
ƒ I have reviewed the data provided by the client and incorporated it into this Site Compliance Report such that the information contained in this report is true and accurate to the best of my knowledge.








 !" #

$%
&

 &

'




()

%* *)

%&+!*+"+ !,










-
./
/

-/012













3

$)





%


453 / 











3

6((
'.4
(

/
-

)

'3
/
7)18

%
%1
9:'

/%
/013

(
/0
/
(7)

/
3
(
;3%

%

//(
%'30)

/
%
/

/())(&
(.


(3

'3

(
/0
/
(
7)

3())


%
1'30)

/
%&
(

'


1<
)//' 
6((
'.4






 =>?@>ABCDEFBGBH
RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Appendix B
Radio Frequency Electromagnetic Energy
Safety Information and Signage Plans
RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Nearest Walking Surface (Ground Level) Simulation
RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Antenna Face Level Simulation
RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Dish Wireless Safety (Signage) Plan
Sign Posting Instructions Required Signage / Mitigation NOC Information
Information signs are used to provide contact information for any questions or concerns for personnel accessing the site.

Securely post 10 feet above ground level at the base of the monopole in a manner conspicuous to all individuals entering thereon as indicated in the signage plan.

Guidelines
Informational sign used to notify workers that there are active antennas installed and provide guidelines for working in RF environments.

Signage not required.

Notice
Used to notify individuals they are entering an area where the power density emitted from transmitting antennas may exceed the FCC’s MPE limit for the general public or occupational exposures.

Signage not required.

Caution
Used to notify individuals that they are entering a hot spot where either the general public or occupational FCC’s MPE limit is or could be exceeded.

Signage not required.

Warning
Used to notify individuals that they are entering a hot zone where the occupational FCC’s MPE limit has been exceeded by 10x.

Securely post 10 feet above ground level at the base of the monopole in a manner conspicuous to all individuals entering thereon as indicated in the signage plan.

Post 10 feet above
ground level at the base
of the tower.

RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Appendix C
Federal Communications
Commission (FCC) Requirements
RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 The FCC has established Maximum Permissible Exposure (MPE) limits for human exposure to Radiofrequency Electromagnetic (RF-EME) energy fields, based on exposure limits recommended by the National Council on Radiation Protection and Measurements (NCRP) and, over a wide range of frequencies, the exposure limits developed by the Institute of Electrical and Electronics Engineers, Inc. (IEEE) and adopted by the American National Standards Institute (ANSI) to replace the 1982 ANSI guidelines. Limits for localized absorption are based on recommendations of both ANSI/IEEE and NCRP.

The FCC guidelines incorporate two separate tiers of exposure limits that are based upon occupational/controlled exposure limits (for workers) and general public/uncontrolled exposure limits for members of the general public.

Occupational/controlled exposure limits apply to situations in which persons are exposed as a consequence of their employment and in which those persons who are exposed have been made fully aware of the potential for exposure and can exercise control over their exposure. Occupational/ controlled exposure limits also apply where exposure is of a transient nature as a result of incidental passage through a location where exposure levels may be above general public/uncontrolled limits (see below), as long as the exposed person has been made fully aware of the potential for exposure and can exercise control over his or her exposure by leaving the area or by some other appropriate means.

General public/uncontrolled exposure limits apply to situations in which the general public may be exposed or in which persons who are exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure. Therefore, members of the general public would always be considered under this category when exposure is not employment-related, for example, in the case of a telecommunications tower that exposes persons in a nearby residential area.

Table 1 and Figure 1 (below), which are included within the FCC’s OET Bulletin 65, summarize the MPE limits for RF emissions. These limits are designed to provide a substantial margin of safety. They vary by frequency to take into account the different types of equipment that may be in operation at a particular facility and are “time-averaged” limits to reflect different durations resulting from controlled and uncontrolled exposures.

The FCC’s MPEs are measured in terms of power (mW) over a unit surface area (cm2). Known as the power density, the FCC has established an occupational MPE of 5 milliwatts per square centimeter (mW/cm2) and an uncontrolled MPE of 1 mW/cm2 for equipment operating in the 1900 MHz frequency range. For the Dish Wireless equipment operating at 600 MHz or 850 MHz, the FCC’s occupational MPE is 2.83 mW/cm2 and an uncontrolled MPE of 0.57 mW/cm2. For the Dish Wireless equipment operating at 1900 MHz, the FCC’s occupational MPE is 5.0 mW/cm2 and an uncontrolled MPE limit of 1.0 mW/cm2.

These limits are considered protective of these populations.

RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Table 1: Limits for Maximum Permissible Exposure (MPE)
(A) Limits for Occupational/Controlled Exposure
Frequency Range
(MHz)
Electric Field
Strength (E)
(V/m)
Magnetic Field
Strength (H)
(A/m)
Power Density (S)
(mW/cm2)
Averaging Time
[E]2, [H]2, or S
(minutes)

0.3-3.0 614 1.63 (100)* 6

3.0-30 1842/f 4.89/f (900/f2)* 6
30-300 61.4 0.163 1.0 6
300-I,500 -- -- f/300 6
1,500-100,000 -- -- 5 6
(B) Limits for General Public/Uncontrolled Exposure
Frequency Range
(MHz)
Electric Field
Strength (E)
(V/m)
Magnetic Field
Strength (H)
(A/m)
Power Density (S)
(mW/cm2)
Averaging Time
[E]2, [H]2, or S
(minutes)

0.3-1.34 614 1.63 (100)* 30

1.34-30 824/f 2.19/f (180/f2)* 30
30-300 27.5 0.073 0.2 30
300-I,500 -- -- f/1,500 30
1,500-100,000 -- -- 1.0 30
f = Frequency in (MHz)
* Plane-wave equivalent power density Power Density (mW/cm2) RF-EME Compliance Report Site No. LSSNA01191A
EBI Project No. 6221006037 2916 Via Gorgonio, San Clemente, California EBI Consulting ™ 21 B Street ™ Burlington, MA 01803 ™ 1.800.786.2346 Based on the above, the most restrictive thresholds for exposures of unlimited duration to RF energy for several personal wireless services are summarized below:

Personal Wireless Service Approximate
Frequency
Occupational
MPE Public MPE
Microwave (Point-to-Point) 5,000 - 80,000 MHz 5.00 mW/cm2 1.00 mW/cm2 Broadband Radio (BRS) 2,600 MHz 5.00 mW/cm2 1.00 mW/cm2 Wireless Communication (WCS) 2,300 MHz 5.00 mW/cm2 1.00 mW/cm2 Advanced Wireless (AWS) 2,100 MHz 5.00 mW/cm2 1.00 mW/cm2 Personal Communication (PCS) 1,950 MHz 5.00 mW/cm2 1.00 mW/cm2 Cellular Telephone 870 MHz 2.90 mW/cm2 0.58 mW/cm2
Specialized Mobile Radio (SMR) 855 MHz 2.85 mW/cm2 0.57 mW/cm2 Long Term Evolution (LTE) 700 MHz 2.33 mW/cm2 0.47 mW/cm2 Most Restrictive Frequency Range 30-300 MHz 1.00 mW/cm2 0.20 mW/cm2 MPE limits are designed to provide a substantial margin of safety. These limits apply for continuous exposures and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size, or health.

Personal Communication (PCS) facilities used by Dish Wireless in this area will potentially operate within a frequency range of 600 to 2100 MHz. Facilities typically consist of: 1) electronic transceivers (the radios or cabinets) connected to wired telephone lines; and 2) antennas that send the wireless signals created by the transceivers to be received by individual subscriber units (PCS telephones). Transceivers are typically connected to antennas by coaxial cables.

Because of the short wavelength of PCS services, the antennas require line-of-site paths for good propagation, and are typically installed above ground level. Antennas are constructed to concentrate energy towards the horizon, with as little energy as possible scattered towards the ground or the sky.

This design, combined with the low power of PCS facilities, generally results in no possibility for exposure to approach Maximum Permissible Exposure (MPE) levels, with the exception of areas directly in front of the antennas.

FCC Compliance Requirement
A site is considered out of compliance with FCC regulations if there are areas that exceed the FCC exposure limits and there are no RF hazard mitigation measures in place. Any carrier which has an installation that contributes more than 5% of the applicable MPE must participate in mitigating these RF hazards.
16776 BERNARDO CENTER DRIVE,
UNIT 203,
SAN DIEGO, CALIFORNIA 92128

TELECOMMUNICATIONS PROJECT MANAGEMENT
T-1

SHEET INDEX

DIRECTIONS

VICINITY MAP

GENERAL NOTES

SITE PHOTO

UNDERGROUND SERVICE ALERT

UTILITY NOTIFICATION CENTER OF CALIFORNIA
(800) 422-4133
WWW.CALIFORNIA811.ORG

CALIFORNIA - CODE COMPLIANCE
DISH Wireless L.L.C. SITE ID:

GORGONIO
DISH Wireless L.L.C. SITE ADDRESS:
2916 VIA GORGONIO
SAN CLEMENTE, CA 92624
LSSNA01191A

SCOPE OF WORK
xxxxxxxxxxxxxxxxxxx
SITE INFORMATION PROJECT DIRECTORY $77$&+0(17
23072 LAKE CENTER DR., SUITE 211
LAKE FOREST, CA 92630
714.624.9027
LS-1
8+%+0+6;/#2
4*
5&
$#5+51($'#4+0)
$#5+51('.'8#6+105

0#8&

(.11&<10'
4'('4'0%'/#25
/10121.'241(+.'

V I A G O R G O N I O

C A L L E V I S T A

T O R I T O

A V E N I D A V A Q U E R O
%114&+0#6'5
.')#.&'5%4+26+10

THAT PORTION OF THE RANCHO ROCA DE LA PLAYA, AS SHOWN ON MAP RECORDED IN BOOK 4, PAGE 118 AND 119, OF PATENTS, IN THE OFFICE OF THE

COUNTY RECORDER OF LOS ANGELES COUNTY, CALIFORNIA, ACQUIRED BY THE STATE OF CALIFORNIA DESCRIBED IN PARCEL 2 OF FINAL ORDER OF CONDEMNATION FILED IN SUPERIOR COURT CASE NO. 71724 (STATE PARCEL NO. 1546), IN AND FOR SAID COUNTY, A CERTIFIED COPY OF SAID FINAL ORDER HAVING BEEN RECORDED OCTOBER 3, 1962 IN
BOOK 6271, PAGE 926 OF OFFICIAL RECORDS, IN THE OFFICE OF THE COUNTYRECORDER OF SAID ORANGE COUNTY, DESCRIBED AS FOLLOWS:

COMMENCING AT THE NORTHEASTERLY TERMINUS OF THE SOUTHEASTERLY LINE OF VAQUERO, 65.00 FEET WIDE, AS SHOWN ON THE TRACT MAP NO. 5879,RECORDED IN BOOK 213, PAGES 42 AND 43, OF MISCELLANEOUS MAPS , IN THE OFFICE OF THE COUNTY RECORDER OF SAID ORANGE COUNTY; THENCE

ALONG THE NORTHEASTERLY PROLONGATION OF SAID SOUTHEASTERLY LINE N 38°49'39" E, 42.76 FEET; THENCE S 54°20'42" E, 29.27 FEET TO THE TRUE POINT OF BEGINNING; THENCE CONTINUING S 54°20'42" E, 114.31 FEET; THENCE S 9°20'42" E, 40.88 FEET; THENCE S 59°16'04" E, 449.83FEET; THENCE S 42°41'07" E; 896.01 FEET TO THE MOST NORTHERLY CORNER OF LOT A OF TRACT NO. 4938 AS SHOWN ON A MAP BOOK RECORDED IN BOOK 177PAGES 35 TO 39 INCLUSIVE OF SAID MISCELLANEOUS MAPS, THENCE ALONG THE FOLLOWING DESCRIBED COURSES OF SAID PARCEL 1: SOUTH 58°17'23" W 606.54FEET; N 66°54'11" W 369.63 FEET; N 48°26'51" W 293.98 FEET; N 20°17'30" W 634.37FEET TO THE SOUTHWESTERLY TERMINUS OF THAT COURSE DESCRIBED AS S 25°24'28" W 390.35 FEET IN SAID PARCEL 1; THENCE ALONG SAID COURSE N25°24'28" E 377.43

FEET TO A NON-TANGENT CURVE CONCAVE NORTHWESTERLY AND HAVING A RADIUS OF 1169.00 FEET; THENCE NORTHEASTERLY ALONG SAID CURVE FROM A TANGENT BEARING N 46°12'21" E, THROUGH AN ANGLE OF 2°47'17" AN ARC A DISTANCE OF 56.88 FEET TO TRUE POINT OF BEGINNING.

EXCEPTING THEREFROM THAT PORTION THEREOF LYING EAST OF THE COMMON SECTION OF LINE OF SECTIONS 29 AND 30, TOWNSHIP 8 SOUTH, RANGE 7 WESTSAN BERNARDINO BASE AND MERIDIAN. #204'%14&190'46+6.'4'2146
5%*'&7.'+++
':%'26+105

4.1 TEMPORARY CONSTRUCTION EASEMENT BY THE CITY OF SAN CLEMENTE, A MUNICIPAL CORPORATION TO STATE OF CALIFORNIA, DATED SEPTEMBER 27, 1978, RECORDED MARCH 27, 1979, IN BOOK 13082, PAGE 408 .

NOTES: TEMPORARY CONSTRUCTION

4.2 FINAL ORDER OF CONDEMNATION BY HUGO A. FORESTER, ET AL. TO THE

PEOPLE OF THE STATE OF CALIFORNIA, ACTING BY AND THROUGH THEDEPARTMENT OF PUBLIC WORKS, RECORDED OCTOBER 03, 1962, IN BOOK 6271, PAGE 926 .

NOTES: FREEWAYNOT PLOTTED. REFERENCE DOCUMENT IS ILLEGIBLE.

4.3 REVISION RIGHTS AND EASEMENTS DESCRIBED WITHIN DEED BOOK 12117, PAGE 980.NOT PLOTTED. REFERENCE DOCUMENT IS ILLEGIBLE.

4.4 EASEMENT DESCRIBED WITHIN DEED BOOK 12117, PAGE 980.

NOT PLOTTED. REFERENCE DOCUMENT IS ILLEGIBLE.

S A N D I E G O F R E E W A Y
23072 LAKE CENTER DR., SUITE 211
LAKE FOREST, CA 92630
714.624.9027
LS-2
.')'0&
/107/'065%114&+0#6'5
&'6#+.ž#ž

V I A G O R G O N I O
16776 BERNARDO CENTER DRIVE,
UNIT 203,
SAN DIEGO, CALIFORNIA 92128

TELECOMMUNICATIONS PROJECT MANAGEMENT
A-1 1
16776 BERNARDO CENTER DRIVE,
UNIT 203,
SAN DIEGO, CALIFORNIA 92128

TELECOMMUNICATIONS PROJECT MANAGEMENT
A-2 1
16776 BERNARDO CENTER DRIVE,
UNIT 203,
SAN DIEGO, CALIFORNIA 92128

TELECOMMUNICATIONS PROJECT MANAGEMENT
A-3 1
16776 BERNARDO CENTER DRIVE,
UNIT 203,
SAN DIEGO, CALIFORNIA 92128

TELECOMMUNICATIONS PROJECT MANAGEMENT
A-4
1 2
3 16776 BERNARDO CENTER DRIVE,
UNIT 203,
SAN DIEGO, CALIFORNIA 92128

TELECOMMUNICATIONS PROJECT MANAGEMENT
A-5
2 1

← All documents from this meeting