AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING

CITY OF SAN CLEMENTE
Meeting Date: February 20, 2024 Agenda Item: 10F
Submitted By: Public Works
Subject:
..titl e

RATIFICATION OF AN EMERGENCY CONSTRUCTION CONTRACT WITH DIAMOND CONSTRUCTION & DESIGN FOR PRIMA DESHECHA CANADA CHANNEL (FACILITY NO. M01) WALL STABILIZATION AT GRANDE VISTA PROJECT; APPROVING A PROJECT CONTINGENCY; AND APPROVING A SUPPLEMENTAL APPROPRIATION IN THE AMOUNT OF $99,585 ..body Fiscal Impact:

A supplemental appropriation in the amount of $99,585 to Account Number 059-553-43420-000- 26001 from the Storm Drain Depreciation Fund is requested for the Prima Deshecha Canada Channel (Facility No. M01) Wall Stabilization at Grande Vista.

Summary:

On February 5, 2024, a portion of the Prima Deshecha Canada Channel (Facility No. M01) channel wall adjacent to Calle Grande Vista between Calle Grande Vista and the Shorecliffs Golf Course failed. See the location map (Attachment 1) for the approximate location of the damaged channel wall.

Before the City Council for consideration is a resolution to ratify an emergency construction contract with Diamond Construction & Design for the Prima Deshecha Canada Channel (Facility No. M01) Wall Stabilization at Grande Vista, in the amount of $77,215, approve a 19% project contingency and approve a supplemental appropriation in the amount of $99,585 to fund the project.

Background:

On February 5, 2024, a portion of the Prima Deshecha Canada Channel (Facility No. M01) channel wall failed. Repairs were unable to be completed due to the continued rainfall and the large amount of runoff through the channel. During this time the slope and nearby residence were monitored.

Staff requested proposals from three contractors, including one local contractor (GCI Construction, Inc.) within the City for the removal of the damaged wall and other debris, the stabilization of the slope and the temporary diversion of the waters within the channel to further protect the slope from added erosion at the base of the slope. All three of these companies have completed previous projects for the City satisfactorily. Staff received two proposals in the amounts of $77,215 and $142,000 from Diamond Construction & Design and Harbor Coating & Restoration, respectively.

Staff reviewed the two proposals and recommended that the City Manager declare an emergency and approve a construction contract with Diamond Construction & Design to complete repairs for 1 Meeting Date: February 20, 2024 Agenda Item: 10F

CITY OF SAN CLEMENTE
the stabilization of the channel wall. The construction contract has been drafted and signed by Diamond Construction & Design (Attachment 2) and it before the City Council for ratification. The work must be completed before additional precipitation occurs and potentially increases to the deterioration of the channel wall and adjacent slope.

Based on the low bid, the estimated construction cost for this project is as follows:

Construction Administration, Management & Inspection: $ 7,700 Construction Contract: 77,215
Contingency (19%): 14,670
Total Estimated Construction Cost: $ 99,585
As required by the City policy and state law, the Contractor will be required to provide performance and payment bonds simultaneously with execution of the construction contract.

Council Options:
 Adopt Resolution No. 24-26 (Attachment 3) ratifying the Emergency Construction Contract with Diamond Construction & Design, approving a 19% project contingency and approving a supplemental appropriation in the amount of $99,585.
 Continue the Item and direct staff to provide additional information.

Environmental Review/Analysis:

This project was determined to be categorically exempt from the California Environmental Quality Act (CEQA) as it pertains to the repair of an already existing flood control channel under Class 1 of the state CEQA Guidelines, Section 15301 – Existing Facilities. A notice of exemption has been filed for this project (See Attachment 4).

Recommended Actions:

Staff Recommendation ..recommendation
Adopt Resolution No. 24-26, which will:

1. Make a finding that an emergency existed due to the need for immediate channel and slope stabilization and required immediate action to protect public health and safety, which might not have been possible if delays attributable to the typical public competitive bidding process had been incurred;

2. Declare that the public interest and necessity demanded the immediate expenditure of public funds to safeguard public health;

3. Approve a supplemental appropriation in the amount of $99,585 to Account Number 059-553- 43420-000-26001 from the Storm Drain Depreciation Fund for the Prima Deshecha Canada Channel (Facility No. M01) Wall Stabilization at Grande Vista;

4. Ratify the Construction Contract with Diamond Construction & Design for an amount not to exceed $77,215 for the stabilization of the M01 channel wall and its adjacent slope; and 2 Meeting Date: February 20, 2024 Agenda Item: 10F

CITY OF SAN CLEMENTE

5. Approve a 19% project contingency of $14,670.
..end
Attachment:

1. Location Map

2. Draft Contract

3. Resolution 24-26

4. Notice of Exemption
Notification:

All bidders.
3