3.5.3.3 Confidential Information. The City shall refrain from releasing Consultant’s proprietary information ("Proprietary Information") unless the City's legal counsel determines that the release of the Proprietary Information is required by the California Public Records Act or other applicable state or federal law, or order of a court of competent jurisdiction, in which case the City shall notify Consultant of its intention to release Proprietary Information.

Consultant shall have five (5) working days after receipt of the Release Notice to give City written notice of Consultant's objection to the City's release of Proprietary Information. Consultant shall indemnify, defend and hold harmless the City, and its officers, directors, employees, and agents from and against all liability, loss, cost or expense (including attorney’s fees) arising out of a legal action brought to compel the release of Proprietary Information. City shall not release the Proprietary Information after receipt of the Objection Notice unless either: (1) Consultant fails to fully indemnify, defend (with City's choice of legal counsel), and hold City harmless from any legal action brought to compel such release; and/or (2) a final and non-appealable order by a court of competent jurisdiction requires that City release such information.

3.5.4 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.5 Attorney's Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney's fees and all other costs of such action.

3.5.6 Indemnification.

3.5.6.1 To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its directors, officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant's Services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Consultant’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers. 482
8 55452.01100\31193624.5

3.5.6.2 If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance as a “design professional” (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.

3.5.7 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.8 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Orange County.

3.5.9 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.10 City's Right to Employ Other Consultants. City reserves right to employ other consultants in connection with this Project.

3.5.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.12 Assignment or Transfer. Consultant shall not assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.13 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subconsultants of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.

3.5.14 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.

3.5.16 No Third-Party Beneficiaries. There are no intended third party 483
9 55452.01100\31193624.5
beneficiaries of any right or obligation assumed by the Parties.

3.5.17 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.18 Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.19 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subconsultant, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of City, state and federal grant requirements and related programs, policies and guidelines currently in effect or hereinafter enacted.

3.5.20 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.21 Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.22 Counterparts/Electronic Signatures. This Agreement may be signed in counterparts, each of which shall constitute an original. This Agreement may be signed with the same force and effect as original ink signatures.

3.6 Subcontracting.

3.6.1 Prior Approval Required. Consultant shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.
484
10 55452.01100\31193624.5
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed on the respective dates set forth opposite of their signatures.

CITY OF SAN CLEMENTE
By:________________________________
Andy Hall, City Manager
ATTEST: Dated: __________________, 2025
____________________________
CITY CLERK of the City of
San Clemente, California
APPROVED AS TO FORM:
_____________________________
Elizabeth A. Mitchell, City Attorney

APPROVED AS TO AVAILABILITY
OF FUNDING:
_____________________________
Finance Authorization

VERDANTAS, INC.
(“CONSULTANT”)
By:_____________________________
Nikhila Srirangpatna, Vice President
Dated: __________________, 2025
By:_____________________________
Kristen Williams, Secretary
Dated: __________________, 2025
485
11 55452.01100\31193624.5
EXHIBIT "A"

SCOPE OF SERVICES
Consultant shall perform the following services as requested by the City on an as needed, on call basis for the City to the City’s satisfaction (collectively, the “Services”):

The Consultant is responsible for the following deliverables:

1. Inform staff of any potential conflicts of interest on a project, if applicable; and

2. Perform geotechnical/geological soils report reviews as needed; and

3. Submit clear and concise correction list to the Development Section of the Public Works Department for distribution to project applicant/designer. (General format of Consultant’s correction list shall be reviewed and approved by the City and may include using electronic plan review software); and

4. Respond to telephone inquiries from City staff and permit applicants regarding review comments; and

5. When requested, the Consultant may be required to attend meetings at City offices or in the field at the project locations; and

6. In addition to the potential meetings regarding plan check services, the City may request your presence during emergency land instability investigations; and

7. Perform recheck reviews on projects to ensure plan corrections have been resolved satisfactorily; and

8. Stamp plans “approved” for compliance with applicable codes; and

9. Return approved plans to Development Section of the Public Works Department office; and

10. Submit weekly progress reports to the Development Section of the Public works Department. Reports shall include up to date status for each project which has been received by the Consultant along with the due date for its review; and

11. Other deliverables as requested by the City.
486
12 55452.01100\31193624.5
EXHIBIT "B"

SCHEDULE OF SERVICES
Consultant shall diligently perform the services to the City’s satisfaction according to the timeframe requested by the City and within the required minimum level of service set forth below:
1 st review = 12 working days
2 nd and subsequent reviews = 7 working days
487
55452.01100\31193624.5
EXHIBIT “C”

INSURANCE REQUIREMENTS

3.2.12 Insurance.

3.2.12.1 Time for Compliance. Consultant shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has provided evidence satisfactory to the City that the subconsultant has secured all insurance required under this section.

3.2.12.2 Types of Insurance Required. As a condition precedent to the effectiveness of this Agreement for work to be performed hereunder, and without limiting the indemnity provisions of the Agreement, the Consultant, in partial performance of its obligations under such Agreement, shall procure and maintain in full force and effect during the term of the Agreement the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Consultant agrees to amend, supplement or endorse the policies to do so.
(A) Commercial General Liability: Commercial General Liability Insurance which affords coverage at least as broad as Insurance Services Office "occurrence" form CG 0001, or the exact equivalent, with limits of not less than $1,000,000 per occurrence and no less than $2,000,000 in the general aggregate. Defense costs shall be paid in addition to the limits. The policy shall contain no endorsements or provisions (1) limiting coverage for contractual liability; (2) excluding coverage for claims or suits by one insured against another (cross-liability); or (3) containing any other exclusion(s) contrary to the terms or purposes of this Agreement. (B) Automobile Liability Insurance: Automobile Liability Insurance with coverage at least as broad as Insurance Services Office Form CA 0001 covering "Any Auto" (Symbol 1), or the exact equivalent, covering bodily injury and property damage for all activities with limits of not less than $1,000,000 combined limit for each occurrence. (C) Workers' Compensation: Workers' Compensation
Insurance, as required by the State of California and Employer's Liability Insurance with a limit of not less than $1,000,000 per accident for bodily injury and disease. (D) Professional Liability (Errors & Omissions): Professional Liability insurance or Errors & Omissions insurance appropriate to Consultant’s profession with limits of not less than $1,000,000 per claim. Covered professional services shall specifically include all work to be performed under the Agreement and delete any exclusions that may potentially affect the work to be performed (for example, any exclusions relating to lead, asbestos, pollution, testing, underground storage tanks, laboratory analysis, soil work, etc.). If coverage is written on a claims-made basis, the retroactive date shall precede the effective date of the initial Agreement and continuous coverage will be maintained or an extended reporting period will be exercised for a period of at least three (3) years from termination or expiration of this Agreement. (E) Cyber Liability Insurance with limits not less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Contractor in this agreement and shall include, but not be limited to, claims involving security breach, system failure, data recovery, 488
55452.01100\31193624.5
business interruption, cyber extortion, social engineering, infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, and alteration of electronic information. The policy shall provide coverage for breach response costs, regulatory fines and penalties as well as credit monitoring expenses.

3.2.12.3 Insurance Endorsements. Required insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Commercial General Liability:
(1) Additional Insured: The City, its officials, officers, employees, agents, and volunteers shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement.

Additional Insured Endorsements shall not (1) be
restricted to "ongoing operations"; (2) exclude "contractual liability"; (3) restrict coverage to "sole" liability of Consultant; or (4) contain any other exclusions contrary to the terms or purposes of this Agreement. For all policies of Commercial General Liability insurance, Consultant shall provide endorsements in the form of ISO CG 20 10 10 01 (or endorsements providing the exact same coverage) to effectuate this requirement.
(2) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (B) Automobile Liability:
(1) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium.

3.2.12.4 Professional Liability (Errors & Omissions):
(A) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (B) Contractual Liability Exclusion Deleted: This insurance shall include contractual liability applicable to this Agreement. The policy must “pay on behalf of” the insured and include a provision establishing the insurer’s duty to defend.

3.2.12.5 Workers' Compensation:
(A) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium.

3.2.12.6 Primary and Non-Contributing Insurance. All policies of Commercial General Liability and Automobile Liability insurance shall be primary and any other 489
55452.01100\31193624.5
insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents, or volunteers shall not contribute with this primary insurance. Policies shall contain or be endorsed to contain such provisions.

3.2.12.7 Waiver of Subrogation. All policies of Commercial General Liability and Automobile Liability insurance shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against the City, its officials, officers, employees, agents, and volunteers, and shall require similar written express waivers and insurance clauses from each of its subconsultants.

3.2.12.8 Deductibles and Self-Insured Retentions. Any deductible or selfinsured retention greater than $5,000 must be approved in writing by the City and shall protect the City, its officials, officers, employees, agents, and volunteers in the same manner and to the same extent as they would have been protected had the policy or policies not contained a deductible or self-insured retention.

3.2.12.9 Evidence of Insurance. The Consultant, concurrently with the execution of the Agreement, and as a condition precedent to the effectiveness thereof, shall deliver either certified copies of the required policies, or original certificates on forms approved by the City, together with all endorsements affecting each policy. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for approval. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15 days) prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the required coverage, Consultant shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies.

3.2.12.10 Failure to Maintain Coverage. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement effective upon notice.

3.2.12.11 Acceptability of Insurers. Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A- VII and authorized to transact business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.

3.2.12.12 Enforcement of Agreement Provisions (non estoppel).

Consultant acknowledges and agrees that actual or alleged failure on the part of the City to inform Consultant of non-compliance with any requirement imposes no additional obligation on the City nor does it waive any rights hereunder.
490
55452.01100\31193624.5

3.2.12.13 Requirements Not Limiting. Requirement of specific coverage or minimum limits contained in this Appendix are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance.

3.2.12.14 Insurance for Subconsultants. Consultant shall include all subconsultants engaged in any work for Consultant relating to this Agreement as additional insureds under the Consultant's policies, or the Consultant shall be responsible for causing subconsultants to purchase the appropriate insurance in compliance with the terms of these Insurance Requirements, including adding the City, its officials, officers, employees, agents, and volunteers as additional insureds to the subconsultant's policies. All policies of Commercial General Liability insurance provided by Consultant’s subconsultants performing work relating to this Agreement shall be endorsed to name the City, its officials, officers, employees, agents and volunteers as additional insureds using endorsement form ISO CG 20 38 04 13 or an endorsement providing equivalent coverage. Consultant shall not allow any subconsultant to commence work on any subcontract relating to this Agreement until it has received satisfactory evidence of subconsultant’s compliance with all insurance requirements under this Agreement, to the extent applicable. The Consultant shall provide satisfactory evidence of compliance with this section upon request of the City.
491
55452.01100\31193624.5
EXHIBIT “D”

COMPENSATION
In full compensation for the Services rendered by the Consultant under the Agreement, the City shall pay the Consultant as follows:

It shall be agreed upon that plan check service invoicing shall be per the City’s latest adopted Engineering Fee Schedule. The total compensation shall not exceed an annual amount of Thirty Thousand dollars ($30,000) without written approval of the City Council or City Manager as applicable.

Plan Check Consultant charges for single-family plan checks are to be charged on a fixed fee schedule per the City’s Engineering Fee Schedule. Any language or text within the Professional Services Agreement, the Request for Proposal, and Consultant Proposal regarding Cost Data, Hourly Rate Schedules, and/or Fee Schedules shall be superseded by the fixed fees as per the latest Engineering Fee Schedule for single-family plan check cost.

Plan check consultants shall charge for such reviews on a fixed fee basis and not exceed the Fee Schedule minus the 15% City overhead cost. The Engineering Fee Schedule is available on the City’s website and is hereby fully incorporated by this reference, which the City may amend from time to time. The fixed fees on the Engineering Fee Schedule are adjusted each July 1 to include any Consumer Price Index (CPI) changes from an April-April yearly period.

Note: There are some occasional single-family developments which the City Engineer may determine to be ‘difficult’ due to landslides or similar issues. The Plan Check Consultant agrees that this determination is solely at the City’s discretion and projects determined to be ‘difficult’ will be forwarded to the Plan Check Consultant with a deposit account work order.

Plan Check Consultant charges for multi-family residential, commercial, industrial, subdivisions, tract maps, parcel maps, certificates of compliance, traffic reviews, and projects deem ‘difficult’ by the City Engineer are to be charged at a time and material basis per the approved Cost Data, Hourly Rate Schedule, and/or Fee Schedule of the Consultant’s Proposal and set forth below. If the expected charge for an individual review is projected to be in excess of $3,500, then the Plan Check Consultant shall notify City Engineering staff and obtain written approval before proceeding further on that particular review. 492
55452.01100
\31193624.5
493
55452.01100\31193624.5
WORKER’S COMPENSATION INSURANCE CERTIFICATION

WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
(ONE OF THE BOXES BELOW MUST BE CHECKED)
I have and will maintain a certificate of consent from the California Labor Commission to self-insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract.

I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract. My workers' compensation insurance carrier and policy number are:

Carrier____________________________________________________ Policy Number______________________________________________ I certify that, in the performance of the work under this Agreement, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and I hereby agree to indemnify, defend, and hold harmless the City of San Clemente and all of its officials, employees, and agents from and against any and all claims, liabilities, and losses relating to personal injury or death, economic losses, and property damage arising out of my failure to provide such worker’s compensation insurance. I further agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.

WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION

COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO

CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.
494
55452.01100\31193624.5
Dated: ________________________, 2025
VERDANTAS, Inc.
(“CONSULTANT”)
By: ________________________________
Kristen Williams
________________________________
Title: Secretary
2600 Michelson Drive, Suite 400, _____
Address
Irvine, CA 92612
495

CITY OF SAN CLEMENTE

REQUEST FOR PROPOSAL
496
2 REQUEST FOR PROPOSAL

ON-CALL (AS-NEEDED) GEOTECHNICAL PLAN CHECK SERVICES
DECEMBER 23, 2024
910 Calle Negocio, Suite #100, San Clemente, CA 92673 Phone: (949) 361-6135 497
3 CITY OF SAN CLEMENTE

REQUEST FOR PROPOSAL

ON-CALL (AS-NEEDED) GEOTECHNICAL PLAN CHECK SERVICES

TABLE OF CONTENTS
Request for Proposal Letter…………………………………………...Page 4
Instructions and Conditions…………………………………………..Page 11
Example of City Standard Professional Services Agreement………..Attached 498
4 CITY OF SAN CLEMENTE

REQUEST FOR PROPOSAL
DECEMBER 23, 2024
Prospective Consultants:

The City of San Clemente (City) is interested in receiving proposals from Professional Services Consultants (Consultants) to conduct on-call (as-needed) geotechnical plan check services as described in detail in the attached Request for Proposal (RFP).

Schedule of Events from Issuance of the RFP to Award of Contract:

1. RFP issued: December 23, 2024

2. Proposal due: on or before 4:00pm – January 20, 2025

3. Consultant interviews: January 27-30, 2025

4. Contract Negotiations (if needed): February 3-4, 2025

5. City Council Award (anticipated): March 4, 2025
City Point of Contact:

The sole source of contact regarding this RFP is Zak Ponsen, Assistant City Engineer at [email protected] or (949)361-6135. Individuals or firms interested in submitting a proposal are asked not to contact other members of the City of San Clemente staff or Councilmembers in connection with the RFP prior to the announcement of the consultant selected.

Proposals and all written inquires related to this RFP are to be submitted to Zak Ponsen at the following address:

Zak Ponsen, P.E. Assistant City Engineer
City of San Clemente
910 Calle Negocio, Suite 100
San Clemente, CA 92673
499
5 Proposal Closing Date:

Three (3) copies of each Consultant’s proposal must be received by the City not later than 4:00 pm, January 20, 2025. All proposals must be delivered to the above address.

Proposals received after 4:00 pm, January 20, 2025 will not be accepted.

Proposals will become part of the official files of the City of San Clemente and cannot be returned.

Sincerely,
Zak Ponsen, P.E.

Assistant City Engineer
Attachments:

1. Request for Proposal including Scope of Work, Description & Instructions.

2. Draft Professional Services Agreement
500

CITY OF SAN CLEMENTE

REQUEST FOR PROPOSAL

ON-CALL (AS-NEEDED) GEOTECHNICAL PLAN CHECK SERVICES
Background about the City of San Clemente (the City) and the project, as well as information about the Scope of Work to be undertaken are discussed in this section of the RFP.

A. INTRODUCTION
The City is seeking proposals from qualified Consultants to perform on-call (asneeded) geotechnical review services of project plans and geotechnical/geological soil reports related to subdivision map processing, grading plans and associated construction improvements for residential, commercial, industrial, public projects, street improvements, and landslide projects of all sizes. Reports may include design recommendations for improvements such as retaining walls, shoring systems, tieback systems, etc.

Consultants may subcontract to another firm for plan check services, if approved by the City. If it is known at this time that you will be subcontracting any portion of the plan check service, please include subcontractor information within your Proposal. All subcontractor billing must be paid through a separate invoicing to be paid by the Consultant.

The City may enter in agreement with more than one Consultant for each of the proposed services within this RFP. The intent of this would be to have a backup Consultant ready in case of heavy workloads or potential conflict of interest situations where the primary Consultant may have been previously involved on the project.

The City’s review of single-family developments is typically done under a fixed fee rate per the latest adopted City Fee Schedule. The Consultant’s maximum invoicing on fixed fee plan checks shall not exceed 85% of the amount of the latest adopted City Fee Schedule. The fixed fee rates are increased each July 1 by the April-April Consumer Price Index for the region. Multi-family, commercial, and landslide projects are typically done under a time and material basis.

Although it is subject to change via City Council action, the Consultant contact term will likely be for a 2-3 year term, with two additional 1-year optional extensions. 501
7 B. BACKGROUND
The City of San Clemente was incorporated in 1928 and has a current population of approximately 68,000. The City and its residents expect a high level of customer service. The City utilizes contractual plan check services when needed to supplement City staff in order to maintain review turnaround timeframes and provide a high level of customer service.

Although the City is reaching near build-out and its tract development has slowed, projects requiring subdivision maps and/or grading plans still occur. Grading permits are often required for vacant land improvements, partial or complete teardowns, parking lot reconstruction, and landslide repairs, etc. Due to the hillside topography of the City, slope stability is also of concern, therefore, most grading plans (and an occasional Building Department plan check) require the preparation and review of a detailed soils report. The City typically contracts all review of soils reports for grading plan projects to an outside Consultant. There are also occasional projects which require building permits, but may not require grading plans, which the Building Official may ask for the soils report to be reviewed by the outside geotechnical plan check Consultant. The actual plan check of the grading plans is provided under a separate contract than this proposed contract, but the geotechnical plan check consultant will be required to review the geotechnical reports for design alternatives, compliance, and coordination with the grading plans.

The geotechnical plan check consultant may submit a separate proposal for the grading plan engineering plan check service contract. The City may enter in agreement with the same company for both contracts, but it is not required for a company to apply to both RFP’s.

Grading & Construction Inspection Activity Summary
Fiscal Year
2019-2020
Fiscal Year
2020-2021
Fiscal Year
2021-2022
Approximate number of
projects that required Soils
Reports to be submitted for
outside Consultant plan
check (1st submittals only)
30 35 30
C. PROJECT OBJECTIVES
The City of San Clemente desires to establish relationships with one or more Consultants in order to enable the City to provide and maintain a high level of 502
8 customer service and reduce peak turn-around timeframes for plan check services on soils/geotechnical report reviews.

D. PROJECT ORGANIZATION AND SCOPE OF WORK
The scope of work is to provide on-call geotechnical review services to the City of San Clemente, Public Works Department in accordance with all of the provisions of this RFP. The general scope includes but is not limited to engineering review and plan check for correctness of reports, design calculation and technical specifications related to materials for proposed improvements, development of correction lists and transmittal of correction lists to the City and applicant. The successful firm must have experience with the processes, procedures, ordinances and permitting, including plan check and review for conformance with conditions of approval along with local and other applicable (City, County, State and Federal) ordinances, laws and standards that are necessary to provide these services and complete the assigned projects.

Consultant(s) selected shall be able to perform complete geotechnical/geological soils report reviews for subdivision and grading permit applications on a variety of single family residential, multifamily residential, commercial, industrial, public projects, street improvement, and slope stability projects. The grading plans typically include much of the improvements associated with the project.

Improvements include but are not limited to: grading, utility services, street improvements, water quality management, drainage devices, erosion and sediment control plans, retaining walls, tie-back walls, and shoring, etc.

The Consultant(s) may be requested to perform complete or partial reviews of projects for compliance with the City’s adopted Grading Ordinance/Code and Grading Manual requirements in accordance with current applicable state and local codes.

Consultant(s) should be knowledgeable in all applicable codes and general engineering practices as related to grading plans and soils reports. All buildings in San Clemente are required to comply with the current Building Standards contained in California Code of Regulations, Title 24 as well as San Clemente Municipal Code – local amendments.
https://library.municode.com/ca/san_clemente/codes/code_of_ordinances?nodeId=TIT15 BUCO
It is anticipated that the plan check review will result in a completed plan check checklist and a summary letter detailing the necessary corrections to the project geotechnical reports for incorporation into the grading and improvement plans. The Consultant shall deliver the plan check package to the assigned City staff within the 503
9 turn-around times as specified in the Deliverable Section below. City staff may review the package and request changes to comments. The City will then notify the developer that the plan check package is ready to be picked up at the City offices.

Consultant must designate a specific individual for the regular plan check for the City of San Clemente. If Consultant changes the specific individual identified in the RFP, then Consultant must provide the City with a resume of the alternative reviewer. Consultant can propose during the RFP two or three alternate reviewers in advance for City’s review and approval.

Consultant must provide a procedure to avoid any conflict of interest with review of a client’s design prepared by Consultant. In such a situation, the City may chose to send plans to be checked by alternate consultant.

Geotechnical/soil report reviews shall be performed by (or under the direct supervision of) a registered civil engineer and geologist in the State of California.

In the near future, the City anticipates performing plan check services electronically through programs such as Bluebeam, E-Plan, etc. so Consultant(s) should identify their current and potential abilities utilizing such programs.

E. DELIVERABLES
The Consultant(s) is/are responsible for the following deliverables:

1. Inform staff of any potential conflicts of interest on a project, if applicable; and

2. Perform geotechnical/geological soils report reviews as needed; and

3. Submit clear and concise correction list to the Development Section of the Public Works Department for distribution to project applicant/designer. (General format of Consultant’s correction list shall be reviewed and approved by the City and may include using electronic plan review software); and

4. Respond to telephone inquires from City staff and permit applicants regarding review comments; and

5. When requested, the Consultant may be required to attend meetings at City offices or in the field at the project locations.

6. In addition to the potential meetings regarding plan check services, the City may request your presence during emergency land instability investigations.

7. Perform recheck reviews on projects to ensure plan corrections have been resolved satisfactorily; and

8. Stamp plans “approved” for compliance with applicable codes; and

9. Return approved plans to Development Section of the Public Works Department office; and
504
10 10. Submit weekly progress reports to the Development Section of the Public works Department. Reports shall include up to date status for each project which has been received by the Consultant along with the due date for its review.

11. The City requires the following minimum review turnaround timeframes (or better) in order to maintain the desired customer service level:

Required Minimum Level of Service
1 st review = 12 working days
2 nd and subsequent reviews = 7 working days
505
1 CITY OF SAN CLEMENTE

REQUEST FOR PROPOSAL

ON CALL (AS-NEEDED) ENGINEERING PLAN CHECK SERVICES

INSTRUCTIONS AND CONDITIONS
The following instructions and conditions apply to this RFP:

A. GENERAL CONDITIONS

1. Pre-Contractual Expenses
Pre-contractual expenses are defined as expenses incurred by the Professional Services Consultant (consultant) in:
• Preparing a proposal in response to this RFP
• Submitting that proposal to the City of San Clemente
• Negotiating with the City of San Clemente on any matter related to this RFP, proposal and/or contractual agreement
• Any other expenses incurred by the contractor prior to the date of an executed contract
The City of San Clemente shall not, in any event, be liable for any pre-contractual expenses incurred by any consultant. In addition, no consultant shall include any such expenses as part of the price proposed to conduct the scope of work for this project.

2. Authority to Withdraw RFP and/or Not Award Contract
The City of San Clemente reserves the right to withdraw this RFP at any time without prior notice. Further, the City makes no representations that any agreement will be awarded to any consultant responding to this RFP. The City expressly reserves the right to postpone the opening of proposals for its own convenience and to reject any and all proposals in response to this RFP without indicating any reasons for such rejection(s).

3. Pricing Approach
506
-2-
The City of San Clemente intends to award a multi-year on-call contract for the conduct of this project. In no event shall the City pay an amount in excess of the dollar value negotiated in the contractual agreement with the successful consultant.

4. Right to Reject Proposals
The City of San Clemente reserves the right to reject any or all proposals submitted. Any award made for this engagement will be made to the consultant(s) which, in the opinion of the City, is/are best qualified to conduct the project.

5. Proposal Evaluation Criteria
Proposals will be evaluated on the basis of their response to all provisions of this RFP. The City of San Clemente may use some or all of the following criteria in its evaluation and comparison of proposals submitted. The criteria listed are not necessarily an allinclusive list. The order in which they appear is not intended to indicate their relative importance:
a. Previous experience- Consultants must have proven experience performing grading plan reviews and/or geotechnical/soils reports reviews for a public agency.
b. Demonstrated record of success on work previously performed for the City or similar work performed for others.
c. Project Lead- identify the primary contact that will be responsible for day-to-day dealings with the City of San Clemente.
d. Educational background of project lead and staff- identify staff that will be utilized to perform work for the City, indicate the professional licenses and certifications possessed by staff. e. Staff to perform work within the specified time- identify staff that will be utilized to perform work for the City in order to meet turnaround timeframes as defined in project deliverables. f. Methodology proposed to accomplish the work and meet or exceed required turnaround times.
507
-3-
g. Ability to make effective public presentations of the report and/or design required.
h. Ability to work effectively with City staff, other public agencies and related parties as directed during the course of the design, study or other services.
i. Pertinent new ideas which may be presented during the course of the selection process.
j. Adequate knowledge of local conditions, codes/regulations, and requirements.
k. Availability, experience and knowledge of all subcontractors hired to complete the job or study- identify the availability of staff that will be assigned to the San Clemente project.
l. Additional work performed by the Consultant which may have a direct and substantial physical relationship or conflict to the proposed project.
m. Previous history of completing projects within budget and design estimates.

6. Ownership and Public Information
Submitted proposals will become property of City of San Clemente and may be subject to Public Records Act.

B. PROPOSAL FORMAT AND CONTENT
Proposals should be typed and as brief as possible. They should not include any elaborate or unnecessary promotional material. The following order and content of proposal sections should be adhered to by each Consultant.

1. Cover Letter
A cover letter not to exceed three pages in length should summarize key elements of the Consultant’s proposal. The letter must be signed by an individual authorized to bind the Consultant. The letter must stipulate that the proposed price will be valid for a period of at least 90 days. Indicate the address and telephone number of the 508
-4-
Consultant’s office located nearest to San Clemente, California, and the office from which the project will be managed.

2. Background and Approach
The Background and Approach Section should describe your understanding of the City, the work to be done, and the objectives to be accomplished.

3. Methodology(ies)
This section should clearly describe the methodology or methodologies you plan to use to carry out the specific work tasks described in the Work Plan.

4. Work Plan
Describe the sequential work tasks you plan to carry out in accomplishing this project. Indicate all key deliverables and their contents. Identify how much of the work will be done on site and in Consultant’s office.

5. Project Organization and Staffing
Describe your approach and methods for managing the project.

Provide an organization chart showing all proposed project team members. Describe the responsibilities of each person on the project team. Identify the Project Director and/or Manager and the person who will be the key contact with the City of San Clemente. Indicate how many hours each team member will devote to the project by task, along with a statement indicating the availability of the members of the project team for the duration of the project. Include resumes for each member of the project team. Include information and staff support required from City personnel.

6. Related Experience
Describe recent, directly related experience. Include on each listing the name of the client; description of the work done; primary client contact, address and telephone number; dates for the project; name of the Project Director and/or Manager and members of the proposed 509
-5-
project team who worked on the project, as well as their respective responsibilities.

At least three references should be included. For each reference, indicate the reference's name, organization affiliation, title, complete mailing address and telephone number. The City of San Clemente reserves the right to contact any of the organizations or individuals listed.

7. Sample Plan Review Correction Lists & Forms
Submit samples of plan review correction lists along with example correspondences for residential and commercial projects.

Additionally, samples of correction lists for slope stability/landslide repair projects is desirable.

8. Project Schedule
Provide a schedule for completing each task in the work program, including deadlines for preparing all project deliverables.

9. Cost Data
Indicate the total cost (time and materials) for which you will conduct the plan review work. For hourly work proposed, identify by project team member: name, classification, and the number of hours each member will spend on each work task. Indicate separately, total cost for fees and expenses, including any proposed fee discount. Provide plan check rates in a separate sealed envelope.

10. Statement of Compliance
Contractors must submit a Statement of Compliance with all parts of the Request for Proposal and Draft Agreement terms and conditions, or a listing of exceptions and suggested changes, along with a description of any cost implications or schedule changes the exceptions and/or changes cause. The Statement of Compliance must declare either:
a. This proposal is in strict compliance with the Request for Proposal and Draft Agreement and no exceptions to either are proposed; or
510
-6-
b. This proposal is in strict compliance with the Request for Proposal and Draft Agreement except for the items listed.

For each exception and/or suggested change, the contractor must include:

1. The suggested change in the RFP or rewording of the
contractual obligations.

2. Reasons for submitting the proposed exception or
change.

3. Any impact the change or exception may have on
project costs, scheduling or other considerations.

11. Other Information
Include any other information you consider to be relevant to the proposal.

12. Consultant agrees that in carrying out its responsibilities under this agreement, and in particular with regard to the employment of persons and sub-contractors working on the project, it will not discriminate on the basis of race, color, creed, national origin, religion, sex, age, or handicap. In the event any of the work performed by consultant hereunder is sub-contracted to another person or firm (with approval of the City as required herein), subcontract shall contain a similar provision. 511
-7-

PROFESSIONAL SERVICES AGREEMENT
FOR [IDENTIFY PROJECT]
THIS PROFESSIONAL SERVICES AGREEMENT (the "Agreement") is made and entered into this _______ day of ___________________, 20___ (the “Effective Date”), by and between the City of San Clemente, a municipal corporation, hereinafter referred to as the "CITY", and __________________________________ of
__________[address]______ hereinafter referred to as the "CONTRACTOR".

R E C I T A L S:

A. CITY requires professional [identify type of service] services to be performed at or in connection with [identify project].

B. CONTRACTOR has represented to CITY that CONTRACTOR is qualified to perform said services and has submitted a proposal to CITY for same.

C. CITY desires to have CONTRACTOR perform said services on the terms and conditions set forth herein.

C O V E N A N T S:

Based on the foregoing Recitals and for good and valuable consideration, the receipt and sufficiency of which is acknowledged by both parties, CITY and CONTRACTOR agree as follows:

ARTICLE 1

RESPONSIBILITIES OF CONTRACTOR

1.1 Term.

The term of this Agreement shall commence on the Effective Date, and shall continue and remain in effect, until [Insert Termination Date] , unless terminated earlier pursuant to the terms hereof. Notwithstanding the forgoing, the City Manager or his or her designee shall have the authority on behalf of the City to administratively approve extensions to the term hereof not to exceed a cumulative total of one hundred eighty (180) days.

1.2 Scope of Services.

CONTRACTOR shall perform any and all work necessary for the completion of the tasks and services set forth in the "Scope of Services" attached hereto and incorporated herein as Exhibit "A" in a manner satisfactory to CITY. By execution of this Agreement, CONTRACTOR warrants that (i) it has thoroughly investigated and considered the work to be performed; (ii) it has carefully examined the location or locations at or with respect 512
-8-
to which the work is to be performed, as applicable; and (iii) it fully understands the difficulties and restrictions attending the performance of the work provided for under this Agreement. CONTRACTOR acknowledges that certain refinements to the Scope of Services may, on occasion, be necessary to achieve CITY’s goals hereunder, and CONTRACTOR shall cooperate with and assist the CITY to identify and make such refinements prior to undertaking any tasks or services that may require refinement.

1.3 Schedule of Performance.

Prior to the City’s execution of this Agreement, and as a condition to the effectiveness hereof, CONTRACTOR shall furnish to CITY proof of insurance coverage as required under Article 5, Insurance. Upon CITY’s release to CONTRACTOR of a fully executed copy hereof and issuance of a written Notice to Proceed, CONTRACTOR shall promptly commence performance of the work. Until such time, CONTRACTOR is not authorized to perform and will not be paid for performing any work under this Agreement.

CONTRACTOR shall exercise reasonable diligence to have the services as set forth in Exhibit "A" completed and submitted to CITY for final approval as soon as reasonably practicable and in accordance with the schedule of performance attached hereto and incorporated herein as Exhibit "B", provided that CONTRACTOR shall be entitled to an extension of time for any delays caused by events or occurrences beyond CONTRACTOR's reasonable control.

1.4 Identity of Persons Performing Work.

CONTRACTOR represents that it employs or will employ at its own expense all personnel required for the satisfactory performance of any and all tasks and services required hereunder. CONTRACTOR shall not replace any of the principal members of the Project team, including any of the persons listed in Exhibit “A” (if CONTRACTOR’S personnel is listed on Exhibit “A”), or any successors to any of such persons, without CITY's prior written approval.

CONTRACTOR represents that the tasks and services required hereunder will be performed by CONTRACTOR or under its direct supervision, and that all personnel engaged in such work shall be fully qualified and shall be authorized and permitted under applicable State and local law to perform such tasks and services. In carrying out such tasks and services, CONTRACTOR shall not employ any undocumented aliens (i.e., persons who are not citizens or nationals of the United States).

This Agreement contemplates the personal services of CONTRACTOR and CONTRACTOR's employees, and it is recognized by the parties hereto that a substantial inducement to CITY for entering into this Agreement was, and is, the professional reputation and competence of CONTRACTOR and CONTRACTOR's employees. Neither this Agreement nor any interest therein may be assigned by CONTRACTOR, except upon written consent of CITY.
513
-9-
Furthermore, CONTRACTOR shall not subcontract any portion of the performance contemplated and provided for herein without the prior written approval of CITY, except for those subcontractors named in the proposal for the project. Nothing herein contained is intended to or shall be construed as preventing CONTRACTOR from employing or hiring as many employees as CONTRACTOR may deem necessary for the proper and efficient execution of this Agreement.

1.5 Cooperation and Coordination of Work With CITY.

CONTRACTOR shall work closely with CITY's designated representative, either individual or committee, who shall have the principal responsibility for liaison and who shall, on a continuous basis, review and approve CONTRACTOR's work.

CONTRACTOR shall ensure that CITY has reviewed and approved all required work as the project progresses.

1.6 Compliance With Laws.

CONTRACTOR shall comply with all applicable Federal, State and local laws, ordinances and regulations, including without limitation all applicable fair labor standards.

CONTRACTOR shall not discriminate against any employee or applicant for employment or any approved subcontractor, agent, supplier or other firm or person providing services to CONTRACTOR in connection with this Agreement on the basis of race, color, creed, ancestry, national origin, religion, sex, sexual orientation, marital status, or mental or physical disability. CONTRACTOR shall take affirmative action to ensure that applicants are employed, and that employees are treated during their employment, without regard to their race, color, creed, ancestry, national origin, religion, sex, sexual orientation, marital status, and mental or physical disability. Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.

Prior to execution of this Agreement, CONTRACTOR shall furnish to CITY proof that CONTRACTOR and all of its subcontractors have a current, valid business license issued by CITY.

1.7 Standard of Performance.

CONTRACTOR acknowledges and understands that the services and work contracted for under this Agreement require specialized skills and abilities and that, consistent with this understanding, CONTRACTOR’s services and work shall be held to a standard of quality and workmanship prevalent in the industry for such service and work. CONTRACTOR represents to CITY that CONTRACTOR holds the necessary skills and abilities to satisfy the standard of work as set forth in this Agreement. CONTRACTOR shall perform the work and services under this Agreement in accordance with such standard of work and in accordance with the accepted standards of the professional disciplines involved in the project. All work shall be completed to the reasonable satisfaction of CITY. If CITY 514
-10-
reasonably determines that the work is not satisfactory, CITY shall have the right to: (i) meet with CONTRACTOR to review CONTRACTOR's work and resolve matters of concern; and/or (ii) require CONTRACTOR to repeat unsatisfactory work at no additional charge until it is satisfactory.

1.8 Contractor Ethics.

CONTRACTOR represents and warrants that it has not provided or promised to provide any gift or other consideration, directly or indirectly, to any officer, employee, or agent of CITY to obtain CITY’s approval of this Agreement. CONTRACTOR shall not, at any time, have any financial interest in this Agreement or the project that is the subject of this Agreement other than the compensation to be paid to CONTRACTOR pursuant to Article 3, Compensation. In the event the work and/or services to be performed hereunder relate to a project and/or application under consideration by or on file with the City, (i) CONTRACTOR shall not possess or maintain any business relationship with the applicant or any other person or entity which CONTRACTOR knows to have a personal stake in said project and/or application, (ii) other than performing its work and/or services to CITY in accordance with this Agreement CONTRACTOR shall not advocate either for or against said project and/or application, and (iii) CONTRACTOR shall immediately notify CITY in the event CONTRACTOR determines that CONTRACTOR has or acquires any such business relationship with the applicant or other person or entity which has a personal stake in said project and/or application. The provisions in this Section 1.8 shall be applicable to all of CONTRACTOR’s officers, directors, employees, and agents, and shall survive the termination of this Agreement.

1.9 Changes and Additions to Scope of Services.

CITY may make changes within the general scope of services provided for in this Agreement. CONTRACTOR shall agree to any such changes that are reasonable.

CONTRACTOR shall make no change in or addition to the character or extent of the work required by this Agreement except as may be authorized in advance in writing by CITY.

Such supplemental authorization shall set forth the specific changes of work to be performed and related extension of time and/or adjustment of fee to be paid to CONTRACTOR by CITY.

1.10 Hiring of Illegal Aliens Prohibited
CONTRACTOR shall not hire or employ any person to perform work within the City of San Clemente or allow any person to perform work required under this Agreement unless such person is a United States citizen or is properly documented and legally entitled to be employed within the United States.
515
-11-

1.11 Endorsement on PS&E/Other Data
CONTRACTOR shall sign all plans, specifications, estimates (PS&E) and engineering data furnished by CONTRACTOR, and where appropriate will indicate CONTRACTOR’s authorized signature and professional registration number.

ARTICLE 2

RESPONSIBILITIES OF CITY

2.1 Provision of Information.

CITY shall provide full information regarding its requirements for the project, and it shall furnish, without charge to CONTRACTOR, any and all information, data, plans, maps and records which are available to CITY and are necessary for the provision by CONTRACTOR of the tasks and services set forth herein.

2.2 Cooperation With CONTRACTOR.

CITY shall cooperate with CONTRACTOR in carrying out the work and services required hereunder without undue delay. In this regard, CITY, including any representative thereof, shall examine plans and documents submitted by CONTRACTOR, shall consult with CONTRACTOR regarding any such plans and documents, and shall render any necessary decisions pertaining to such plans and documents as promptly as is practicable.

ARTICLE 3

PAYMENT

3.1 Payment Schedule: Maximum Payment Amount.

Prior to the tenth of the month, CONTRACTOR shall submit to CITY a monthly status report and invoices itemizing the services rendered during the previous month. Within fifteen (15) working days after receipt of an invoice from CONTRACTOR, CITY shall determine whether and to what extent CONTRACTOR has adequately performed the services for which payment is sought. If CITY determines that CONTRACTOR has not adequately performed such services, CITY shall inform CONTRACTOR of those acts which are necessary for satisfactory completion. Subject to the provisions of Section 5.2 below, which provide for the City to withhold payment in the event CONTRACTOR’s insurance expires during the term of this Agreement, CITY shall cause payment to be made to CONTRACTOR within fifteen (15) working days from CITY's determination that CONTRACTOR has adequately performed those services for which CITY has been invoiced. In no case shall CITY pay in excess of each line item set forth in Exhibit "A" for any particular task unless approved and authorized by the CITY in writing (applicable only if Exhibit “A” breaks down the Scope of Services on a line item basis). The total compensation for the Scope of Services set forth in Exhibit "A" shall not exceed ____________________ ($_____________), including all amounts payable to CONTRACTOR for its overhead, payroll, profit, and all costs of whatever nature, 516
-12-
including without limitation all costs for subcontracts, materials, equipment, supplies, and costs arising from or due to termination of this Agreement (the “Total Compensation”).

3.2 Changes in Work.

If CONTRACTOR estimates that any proposed change within the general scope of services set forth in Exhibit "A" causes an increase or decrease in the cost and/or the time required for performance of this Agreement, CONTRACTOR shall so notify CITY of that fact in advance of commencing performance of such work. Any such change, and the cost for such change, shall be agreed upon by CITY and CONTRACTOR, and reduced to a writing that, once signed by both CITY and CONTRACTOR, shall modify this Agreement accordingly. In determining the amount of any cost increase for such change, the value of the incomplete portions of the original tasks and services affected by the change shall be credited back to CITY.

3.3 Additional Work.

CITY may request CONTRACTOR to perform additional services not covered by the specific scope of services set forth in Exhibit "A", and CONTRACTOR shall perform such extra services and will be paid for such extra services when the extra services and the cost thereof are reduced to writing, signed by both CITY and CONTRACTOR, and made a part of this Agreement. CITY shall not be liable for payment of any extra services nor shall CONTRACTOR be obligated to perform any extra services except upon such written amendment. To the extent that the extra services render all or a portion of the original tasks and services unnecessary, the value of the unnecessary and incomplete portions of original tasks and services shall be credited back to CITY.

ARTICLE 4

INDEPENDENT CONTRACTOR
CONTRACTOR is an independent contractor and not an employee of the CITY. Neither the CITY nor any of its employees shall have any control over the conduct of the CONTRACTOR or any of CONTRACTOR's employees, except as herein set forth, and CONTRACTOR expressly warrants not to, at any time or in any manner, represent that CONTRACTOR, or any of CONTRACTOR's agents, servants or employees, are in any manner agents, servants or employees of the CITY, it being distinctly understood that CONTRACTOR is and shall at all times remain as to the CITY a wholly independent contractor and that CONTRACTOR's obligations to the CITY are solely such as are prescribed by this Agreement.
517
-13-
ARTICLE 5

INDEMNITY AND INSURANCE

5.1 Indemnification

FOLLOWING PARAGRAPH APPLICABLE TO AGREEMENTS WHERE
CONTRACTOR IS A “LICENSED DESIGN PROFESSIONAL” AND IS
PROVIDING DESIGN PROFESSIONAL SERVICES:

To the fullest extent permitted by law (including, without limitation, California Civil Code Sections 2782 and 2782.8), CONTRACTOR shall defend (with legal counsel reasonably acceptable to the CITY), indemnify, and hold free and harmless CITY and CITY's agents, officers, and employees, and the San Clemente Redevelopment Agency and its agents, officers, and employees (collectively, the “Indemnitees”) from and against any and all claims, loss, cost, damage, injury (including, without limitation, injury to or death of CONTRACTOR or any officers, agents, employees, representatives, or subcontractors of CONTRACTOR [collectively, the “CONTRACTOR ENTITIES”]), expense and liability of every kind, nature and description (including, without limitation, incidental and consequential damages, court costs, attorney’s fees, litigation expenses and fees of expert Contractors or expert witnesses incurred in connection therewith and costs of investigation) that arise out of, pertain to, or relate to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of CONTRACTOR, any of the CONTRACTOR ENTITIES, anyone directly or indirectly employed by any of them, or anyone that they control (collectively, the “Liabilities”). Such obligation to defend, hold harmless and indemnify any Indemnitee shall not apply to the extent that such Liabilities are caused in part by the sole negligence, active negligence, or willful misconduct of such Indemnitee.

FOLLOWING PARAGRAPH APPLICABLE TO AGREEMENTS WHERE
CONTRACTOR IS NOT A “LICENSED DESIGN PROFESSIONAL”:

CONTRACTOR shall defend (with legal counsel reasonably acceptable to the CITY), indemnify, and hold free and harmless CITY and CITY's agents, officers, and employees, and the San Clemente Redevelopment Agency and its agents, officers, and employees from and against any and all claims, loss, cost, damage, injury (including, without limitation, injury to or death of an employee of CONTRACTOR or CONTRACTOR’s officers, agents, employees, representatives, or subcontractors [collectively, the “CONTRACTOR ENTITIES”]), expense and liability of every kind, nature and description (including, without limitation, incidental and consequential damages, court costs, attorney’s fees, litigation expenses and fees of expert Contractors or expert witnesses incurred in connection therewith and costs of investigation) that arise out of, pertain to, or relate to, directly or indirectly, in whole or in part, the actions or failure to act of CONTRACTOR, any of the CONTRACTOR ENTITIES, anyone directly or indirectly employed by any of them, or anyone that they control, under this Agreement. 518
-14-
For purposes of this Agreement, a “Licensed Design Professional” shall be limited to licensed architects, registered professional engineers, licensed professional land surveyors and landscape architects, all as defined under current law, and as may be amended from time to time by California Civil Code § 2782.8.

5.2 Insurance.

Prior to the City’s execution of this Agreement, and as a condition to the effectiveness hereof, CONTRACTOR shall submit certificates and endorsements to CITY indicating compliance with the following minimum insurance requirements, and CONTRACTOR shall maintain such insurance in effect during the entire term of this Agreement:

A. Workers' Compensation insurance to cover CONTRACTOR's employees as required by the California Labor Code with employer’s liability limits not less than One Million Dollars ($1,000,000) per accident or disease.

Before execution of this Agreement by CITY, CONTRACTOR shall file with CITY the attached signed Worker's Compensation Insurance Certification. CONTRACTOR shall require all subcontractors similarly to provide such compensation insurance for the respective employees.

None of the CITY, the San Clemente Redevelopment Agency, or any of their respective officers, employees, and agents will be responsible for any claims in law or equity occasioned by failure of CONTRACTOR to comply with this paragraph.

B. Commercial General Liability, personal injury and property damage liability, contractual liability, independent contractor's liability, and automobile liability insurance, with minimum combined liability limits of One Million Dollars ($1,000,000) per occurrence for all covered losses, and Two Million Dollars ($2,000,000) in the aggregate. Any deductible or selfinsured retention in excess of Five Thousand Dollars ($5,000) shall be declared to the City and requires the prior approval of the City’s Risk Manager. Each such policy of insurance shall:
(1) be issued by companies that hold a current policy holder’s alphabetic and financial size category rating of not less than A-VII, according to the current Best’s Key Rating Guide or a company of equal financial stability that is approved by CITY’s Risk Manager for all coverages except surety.
(2) name and list as additional insureds CITY, CITY’s officers, employees, and agents and, if the CITY’s Risk Manager so requires, the City of San Clemente Redevelopment Agency and its officers, employees, and agents. An endorsement shall accompany the insurance certificate naming such additional insureds.
519
-15-
(3) specify it acts as primary insurance and that no insurance held or owned by CITY (or, if applicable, the San Clemente Redevelopment Agency) shall be called upon to cover a loss under said policy; (4) contain a clause substantially in the following words: "it is hereby understood and agreed that this policy may not be canceled or materially changed except upon thirty (30) days prior written notice to CITY of such cancellation or material change as evidenced by a return receipt for a registered letter;"
(5) cover the operations of CONTRACTOR pursuant to the terms of this Agreement; and
(6) be written on an occurrence and not a claims made basis.

C. Professional Liability or Errors and Omissions insurance specifically designed to protect against acts, errors or omissions of the CONTRACTOR and “covered professional services” as designated in the policy must specifically include work performed under this Agreement. The policy limit shall be not less than One Million Dollars ($1,000,000) per claim and One Million Dollars ($1,000,000) in the aggregate. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer’s duty to defend.
 If this box is checked and CITY has initialed below, the requirement for Professional Liability or Errors and Omissions insurance set forth in paragraph C above is hereby waived.

CITY’s Initials: _____
Notwithstanding anything herein to the contrary, in the event any of CONTRACTOR’s insurance as required pursuant to this Section 5.2 expires during the term of this Agreement, CITY shall withhold any payment due to CONTRACTOR hereunder until such time as CONTRACTOR obtains replacement insurance that meets all of the applicable requirements hereunder and submits certificates and endorsements evidencing such insurance to CITY.

CONTRACTOR shall require all of its subcontractors to procure and maintain during the course of their subcontract work with CONTRACTOR insurance that complies with the foregoing minimum insurance requirements. CONTRACTOR shall obtain from such subcontractors and retain in its files certificates evidencing such compliance. 520
-16-
ARTICLE 6

TERMINATION
This Agreement may be terminated by CITY for any reason, with or without cause, upon written notice to CONTRACTOR. In such event, CONTRACTOR shall be compensated for all services performed and costs incurred up to the date of notification for which CONTRACTOR has not been previously compensated, plus termination expenses reasonably incurred and properly accounted for (but in no event to exceed the amount which, when combined with other amounts paid, exceeds the amount for any uncompleted task set forth in Exhibit "A", as applicable). Upon receipt of notice of termination from CITY, CONTRACTOR shall immediately stop its services, unless otherwise directed, and deliver to CITY all data, drawings, reports, estimates, summaries and such other information and materials as may have been accumulated by CONTRACTOR in the performance of this Agreement, whether completed or in process.

ARTICLE 7

MISCELLANEOUS

7.1 Ownership of Documents.

All reports, software programs, as well as original data collected, original reproducible drawings, plans, studies, memoranda, computation sheets and other documents assembled or prepared by CONTRACTOR or furnished to CONTRACTOR in connection with this Agreement shall be the property of CITY and delivered to CITY at completion of the project or termination of this Agreement, whichever occurs first. Copies of said documents may be retained by CONTRACTOR, but shall not be made available by CONTRACTOR to any individual or organization without the prior written approval of CITY.

Any use of completed documents for projects other than that covered by this Agreement and/or any use of uncompleted documents without specific written authorization from CONTRACTOR will be at CITY's sole risk and without liability or legal exposure to CONTRACTOR.

7.2 Notices.

Any notices to be given under this Agreement shall be given by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States mail, addressed to CONTRACTOR at [address] , and to the City of San Clemente, [address] , San Clemente, California ______, Attention: [specify] .

7.3 Covenant Against Contingent Fees.

CONTRACTOR warrants that it has not employed or retained any company or person to solicit or secure this Agreement and that it has not paid or agreed to pay any company or person any fee or commission from the award or making of this Agreement. For breach or violation of this warranty, CITY shall have the right to annul this Agreement without 521
-17-
liability or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of such fee or commission.

7.4 Liquidated Damages.
 APPLICABLE ONLY IF THIS BOX HAS BEEN CHECKED AND BOTH PARTIES HAVE INITIALED BELOW.

If CITY seeks monetary damages for CONTRACTOR’S failure to complete all of the services required hereunder by the completion date set forth in Exhibit “B” (the “Completion Date”), CONTRACTOR shall be required to pay to CITY _________ Dollars ($_____) per day for each day beyond the Completion Date that any of such services remain uncompleted; provided, however, that nothing herein shall be deemed to limit CITY’s remedy for CONTRACTOR’s failure to complete all services required hereunder by the Completion Date to seeking monetary damages, and CITY shall be entitled to pursue any other equitable remedy permitted by law, including, without limitation, specific performance.

THE PARTIES HERETO AGREE THAT THE AMOUNT SET FORTH IN THIS SECTON 7.4 (THE “DAMAGE AMOUNT”) CONSTITUTES A REASONABLE

APPROXIMATION OF THE ACTUAL DAMAGES THAT CITY WOULD SUFFER DUE TO CONTRACTOR’S FAILURE TO COMPLETE ALL OF THE SERVICES

REQUIRED HEREUNDER BY THE COMPLETION DATE, CONSIDERING ALL OF

THE CIRCUMSTANCES EXISTING ON THE EFFECTIVE DATE OF THIS

AGREEMENT, INCLUDING THE RELATIONSHIP OF THE DAMAGE AMOUNTS

TO THE RANGE OF HARM TO CITY, THAT REASONABLY COULD BE

ANTICIPATED AND THE ANTICIPATION THAT PROOF OF ACTUAL DAMAGES WOULD BE COSTLY OR INCONVENIENT. THE DAMAGE AMOUNT SET FORTH IN THIS SECTION 7.4 SHALL BE THE SOLE DAMAGES REMEDY FOR CONTRACTOR’S FAILURE TO COMPLETE ALL OF THE SERVICES REQUIRED

HEREUNDER BY THE COMPLETION DATE, BUT NOTHING IN THIS SECTION

7.4 SHALL BE INTERPRETED TO LIMIT CITY’S REMEDY FOR CONTRACTOR’S

FAILURE TO COMPLETE ALL OF THE SERVICES REQUIRED HEREUNDER BY THE COMPLETION DATE TO SUCH A DAMAGES REMEDY. IN PLACING ITS

INITIALS AT THE PLACES PROVIDED HEREINBELOW, EACH PARTY

SPECIFICALLY CONFIRMS THE ACCURACY OF THE STATEMENTS MADE

ABOVE AND THE FACT THAT EACH PARTY HAS BEEN REPRESENTED BY

COUNSEL OR HAS HAD THE OPPORTUNITY TO BE REPRESENTED BY

COUNSEL TO EXPLAIN THE CONSEQUENCES OF THE LIQUIDATED DAMAGES PROVISION AT OR PRIOR TO THE TIME EACH EXECUTED THIS AGREEMENT.

CONTRACTOR’S INITIALS: ___________ CITY’S INITIALS: ___________ Notwithstanding any of the above, nothing herein is intended to preclude the CITY’s recovery of its attorney’s fees and costs incurred to enforce this Section 7.4, as provided in Section 7.10 below.
522
-18-

7.5 Interpretation and Enforcement of Agreement.

This Agreement shall be construed and interpreted both as to validity and performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim, or matter arising out of or in relation to this Agreement shall be instituted and maintained in the Superior Court of the County of Orange, State of California, or in any other appropriate court with jurisdiction in such county, and CONTRACTOR agrees to submit to the personal jurisdiction of such court.

7.6 Disputes.

In the event of any dispute arising under this Agreement, the injured party shall notify the defaulting party in writing of its contentions by submitting a claim therefor. The injured party shall continue performance of its obligations hereunder so long as the defaulting party immediately commences to cure such default and completes the cure of such default with reasonable diligence and in no event to exceed 30 days after service of the notice, or such longer period as may be permitted by the injured party; provided, that if the default results in an immediate danger to the health, safety, and general welfare, CITY may take such immediate action as CITY deems warranted.

7.7 Retention of Funds.

CITY may withhold from any monies payable to CONTRACTOR sufficient funds to compensate CITY for any losses, costs, liabilities or damages suffered by CITY due to default of CONTRACTOR in the performance of the services required by this Agreement.

7.8 Waiver.

No delay or omission in the exercise of any right or remedy by a nondefaulting party shall impair such right or remedy or be construed as a waiver. CITY's consent or waiver of one act or omission by CONTRACTOR shall not be deemed to constitute a consent or waiver of CITY's rights with respect to any subsequent act or omission by CONTRACTOR. Any waiver by either party of any default must be in writing.

7.9 Rights and Remedies are Cumulative.

Except as may be expressly set forth in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies or other rights or remedies as may be permitted by law or in equity shall not preclude the exercise by such party, at the same or different times, of any other rights or remedies to which such party may be entitled.

7.10 Attorneys’ Fees.
523
-19-
In the event either party commences an action against the other party arising out of or in connection with this Agreement, the prevailing party in such action shall be entitled to recover its reasonable costs and expenses, including without limitation reasonable attorneys’ fees and costs. Attorneys’ fees shall include attorneys’ fees on any appeal, and in addition, a party entitled to attorneys’ fees shall be entitled to all other reasonable costs for investigating such action, including the taking of depositions and discovery, expert witness fees, and all other necessary costs incurred in the litigation, suit, or other action requiring attorney time. All such fees shall be enforceable whether or not such action is prosecuted to final judgment.

7.11 Integrated Agreement.

This Agreement contains all of the agreements of the parties and cannot be amended or modified except by written agreement. No prior oral or written understanding shall be of any force or effect with respect to those matters covered in this Agreement.

7.12 Authority.

The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties. [APPLICABLE TO INDIVIDUAL CONTRACTORS ONLY]

7.13 Compliance with California Unemployment Insurance Code Section 1088.8: Prior to signing the Contract, CONTRACTOR shall provide to CITY a completed and signed Form W-9, Request for Taxpayer Identification Number and Certification.

CONTRACTOR understands that pursuant to California Unemployment Insurance Code Section 1088.8, the CITY will report the information from Form W-9 to the State of California Unemployment Development Department, and that the information may be used for the purposes of establishing, modifying, or enforcing child support obligations, including collections, or reported to the Franchise Tax Board for tax enforcement purposes. [End – Signature page follows]
524
- 20 -
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed on the respective dates set forth opposite their signatures.

CITY OF SAN CLEMENTE
By:

ATTEST: Its:
______________________________ Dated: ____________________, 20____ CITY CLERK of the City of
San Clemente, California
APPROVED AS TO FORM:

Burke, Williams & Sorensen, LLP
By:

Elizabeth A. Mitchell, City Attorney

APPROVED AS TO AVAILABILITY

OF FUNDING
By: _____________________________
Finance Authorization
(“CONTRACTOR”)
Contractor’s License Number___________
By:

Its:

Dated: ____________________, 20____
525
EXHIBIT “A”
EXHIBIT “A”

SCOPE OF SERVICES
[To be inserted by CITY]
[Scope of Services should include complete description of scope of work, identification of Project team, and payment schedule by task. See Sections 1.2, 1.4, and 3.1 of Agreement]
526
EXHIBIT “B”
EXHIBIT “B”

SCHEDULE OF PERFORMANCE
[To be inserted by CITY]
[See 1.3 of Agreement]
527
EXHIBIT “B”
WORKER’S COMPENSATION INSURANCE CERTIFICATION
___________________________________________
Project No. _________

WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
(ONE OF THE BOXES BELOW MUST BE CHECKED)
I have and will maintain a certificate of consent from the California Labor Commission to self-insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract.

I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract. My workers' compensation insurance carrier and policy number are:

Carrier___________________________________________________ Policy Number______________________________________________ I certify that, in the performance of the work under this Agreement, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and I hereby agree to indemnify, defend, and hold harmless the City of San Clemente and all of its officials, employees, and agents from and against any and all claims, liabilities, and losses relating to personal injury or death, economic losses, and property damage arising out of my failure to provide such worker’s compensation insurance. I further agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.

WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION

COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO

CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED
THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.
528
-2-
Dated: ________________________, 20____
________________________________
Contracting Firm
By: ________________________________
________________________________
Title
________________________________
Address
________________________________
529
131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com 131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com PROPOSAL TO PROVIDE ONǦCALL (ASǦNEEDED)

GEOTECHNICAL PLAN CHECK SERVICES
Prepared For:

City of San Clemente
Attn: Mr. Zak Ponsen
910 Calle Negocio, Suite 100
San Clemente, California 92673
$WWDFKPHQW
530
131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com

ƒ—ƒ”›ʹͲǡʹͲʹͷ

ƒ‘•‡ǡǤǤ••‹•–ƒ–‹–›‰‹‡‡”
City of San Clemente
ͻͳͲƒŽŽ‡‡‰‘
‹‘ǡ—‹–‡ͳͲͲ
ƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒͻʹ͸͹͵
Subject: Proposal to Provide OnǦCall (AsǦNeeded) Geotechnical Plan Check Services for the City of San Clemente, California

ƒ

‘”†ƒ
‡™‹–Š›‘—””‡“—‡•–ǡ

‡‘–‡
А‹
ƒŽǡ

ǤŠƒ•’”‡’ƒ”‡† –Š‹•’”‘’‘•ƒŽ –‘’”‘˜‹†‡‰‡‘–‡
А‹
ƒŽ’Žƒ

Ї
 •‡”˜‹
‡• ˆ‘” –Ї ‹–› ‘ˆƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒǤŠ‹• ’”‘’‘•ƒŽ Šƒ• „‡‡ ’”‡’ƒ”‡† „ƒ•‡† ‘ –Ї ’”‘˜‹†‡† ”‡“—‡•–ˆ‘”’”‘’‘•ƒŽǡ‘—”–‡
А‹
ƒŽ‘™Ž‡†‰‡ƒ†‘—”‰‡‘–‡
А‹
ƒŽ‡š’‡”‹‡
‡‹ƒއ‡–‡Ǥ


‡‘–‡
А‹
ƒŽ‹•Ž‘
ƒ–‡†‹ƒއ‡–‡ƒ†Šƒ•‡š–‡•‹˜‡‡š’‡”‹‡
‡™‹–Š–ЇŽ‘
ƒŽ‰‡‘Ž‘‰‹

‘†‹–‹‘•ƒ†
™‘”‹‰ ˆ‘”ƒ†™‹–Š –Ї‹–›‘ˆƒއ‡–‡Ǥ

‡‘–‡
А‹
ƒŽ™ƒ• ˆ‘—†‡†‹ƒއ‡–‡ƒ†‘•–‘ˆ‘—”
’‡”•‘‡Ž”‡•‹†‡Ї”‡‹Ǥ
”‡
‡–Š‹•–‘”›ǡ™‡Šƒ˜‡’‡”ˆ‘”‡†‘”‡
‘•—Ž–‹‰™‹–Š‹–Ї‹–›ƒ†’”‘˜‹†‡†‘”‡

‘•—Ž–‹‰ˆ‘”–Ї‹–›–Šƒƒ›‘–Ї”‰‡‘–‡
А‹
ƒŽ
‘•—Ž–ƒ–Ǥ

‡‘–‡
А‹
ƒŽ‘™•ƒއ‡–‡Ǥ‘–‘Ž›ƒ”‡
™‡ ˆƒ‹Ž‹ƒ”™‹–Š –Ї‹–› ”‡“—‹”‡‡–•ǡ™‡—†‡”•–ƒ†„‡––‡”ƒ†Šƒ˜‡‘”‡‡š’‡”‹‡ ‡™‹–Š –ЇŽ‘
ƒŽ‰‡‘Ž‘‰›
–Šƒƒ›‘–Ї”
‘•—Ž–ƒ–Ǥ—”’‡”•‘‡ŽŠƒ˜‡’”‘˜‹†‡†‰‡‘–‡
А‹
ƒŽ
‘•—Ž–‹‰•‡”˜‹
‡•ˆ‘”‘˜‡”ͳǡͲͲͲ”‡•‹†‡
‡•
‹ƒއ‡–‡ƒ†Šƒ˜‡’”‘˜‹†‡†‰‡‘–‡
А‹
ƒŽ‘„•‡”˜ƒ–‹‘ƒ†–‡•–‹‰‘‘˜‡”ʹͺ‹Ž‡•‘ˆ—†‡”‰”‘—†—–‹Ž‹–‹‡• ƒ† •–”‡‡–
‘•–”—
–‹‘ ‹ ƒŽ‡‰ƒ ƒŽ‘‡Ǥ ††‹–‹‘ƒŽŽ›ǡ ™‡ Šƒ˜‡ ™‘”‡† ‘ ‰”ƒ†‹‰ ’”‘Œ‡ –• ‹ ƒ އ‡–‡
‹˜‘Ž˜‹‰‘˜‡”ͳͷ‹ŽŽ‹‘
—„‹
›ƒ”†•‘ˆˆ‹ŽŽ†‡”‹˜‡†ˆ”‘–Їƒ’‹•–”ƒ‘ ‘”ƒ–‹‘Ǥ•™‡Šƒ˜‡†‘‡‹–Ї’ƒ•–ǡ 

‡‘–‡
А‹
ƒŽ ™‹ŽŽ ”‡’”‡•‡– –Ї ‹–›ǯ• „‡•– ‹–‡”‡•– –‘ ‡•—”‡ –Šƒ– ‡˜‡”› ‡ˆˆ‘”– ‹• ƒ†‡ –‘ ‡•—”‡ –Ї Ž‘ ƒŽ
•–ƒ†ƒ”†‘ˆ
ƒ”‡‹•‡–ƒ†–Ї‹–›ǯ•
”ƒ†‹‰”†‹ƒ
‡ƒ†
”ƒ†‹‰ƒ—ƒŽ”‡“—‹”‡‡–•ƒ”‡‡ˆ‘”
‡†Ǥ
‡˜‹ ‘Ž•‘ǡ ”‹
‹’ƒŽ
‡‘Ž‘‰‹•– ˆ‘” 

‡‘–‡
А‹
ƒŽǡ ƒ ”‡‰‹•–‡”‡† ‰‹‡‡”‹‰
‡‘Ž‘‰‹•– ‹ –Ї –ƒ–‡ ‘ˆ
ƒŽ‹ˆ‘”‹ƒǡ ™‹ŽŽ ƒ
– ƒ• ”‘Œ‡
– ƒƒ‰‡” ƒ† ›‘—” ’‘‹– ‘ˆ
‘–ƒ
–Ǥ —” ”‡˜‹‡™ •‡”˜‹
‡• ™‹ŽŽ „‡ ’”‘˜‹†‡† ƒ†
ƒƒ‰‡† ˆ”‘ ‘—” ƒ އ‡–‡ ‘ˆˆ‹
‡ Ž‘
ƒ–‡† ƒ– ͳ͵ͳ ƒŽŽ‡
‰Ž‡•‹ƒǡ —‹–‡ ʹͲͲǡ ƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒ ͻʹ͸͹ʹǡ ȋͻͶͻȌ ͵͸ͻǦ͸ͳͶͳǤ ”Ǥ ‘Ž•‘ ƒ› ƒŽ•‘ „‡ ”‡ƒ
Ї† †‹”‡
–Ž› ˜‹ƒ
‡ŽŽ ’Š‘‡ ȋͻͶͻȌ ͶͳʹǦͲ͸Ͷͺ ƒ† ‡ƒ‹Ž
ȋ
‘Ž•‘̷މ
‰‡‘–‡
А‹
ƒŽǤ
‘ȌǤ
‡ Šƒ˜‡ ’”‡’ƒ”‡† –Š‹• ’”‘’‘•ƒŽ –‘ ’”‘˜‹†‡ ›‘— ™‹–Š ƒ ‘˜‡”˜‹‡™ ‘ˆ ‘—” ˆ‹” ƒ† ‘—” ‡š’‡”‹‡ ‡Ǥ 


‡‘–‡
А‹
ƒŽǯ•
‘”’‘”ƒ–‡ ’Ћޑ•‘’Š›
‘„‹‡•
‘‹–‡–ǡ‘–‹˜ƒ–‹‘ǡ ƒ† –‡ƒ™‘” –‘ ’”‘˜‹†‡ ‘—” Ž‹‡–•
™‹–Š “—ƒŽ‹–›™‘”‹ƒ –‹‡Ž›ƒ† ’”‘ˆ‡••‹‘ƒŽƒ‡”Ǥ”‹ ‡•
‘–ƒ‹‡†™‹–Š‹™‹ŽŽ„‡ ˜ƒŽ‹† ˆ‘”ƒ’‡”‹‘†‘ˆƒ–
އƒ•–ͻͲ†ƒ›•Ǥ
‡ •‹
‡”‡Ž› ƒ’’”‡
‹ƒ–‡ –Š‹• ‘’’‘”–—‹–›Ǥ Š‘—ކ ›‘— Šƒ˜‡ ƒ› “—‡•–‹‘•ǡ ’އƒ•‡ †‘ ‘– Ї•‹–ƒ–‡ –‘ ‘–ƒ
– ‘—”
‘ˆˆ‹
‡Ǥ
‡•’‡
–ˆ—ŽŽ›—„‹––‡†ǡ
LGC Geotechnical, Inc.
‡˜‹Ǥ‘Ž•‘ǡ

”‹
‹’ƒŽ
‡‘Ž‘‰‹•–
‹•–”‹„—–‹‘ǣ ȋ͵Ȍ††”‡••‡‡ȋ͵™‡–Ǧ•‹‰‡†
‘’‹‡•Ȍ
LGC Geotechnical, In
 ‹   Ž 

531
TOC January 2025

TABLE OF CONTENTS
Section Page
BACKGROUND AND APPROACH....................................................................................................... 1

‡‘–‡
А‹
ƒŽ‰‹‡‡”‹‰ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤʹ ‰‹‡‡”‹‰
‡‘Ž‘‰›ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤʹ METHODOLOGY ................................................................................................................................... 2 WORK PLAN.......................................................................................................................................... 4 PROJECT ORGANIZATION AND STAFFING..................................................................................... 5 ”‘Œ‡
–ƒƒ‰‡‡–ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤͷ 
”‰ƒ‹œƒ–‹‘Šƒ”–ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ͹ RESUMES FOR KEY TECHNICAL TEAM MEMBERS ....................................................................... 7 ‡˜‹Ǥ‘Ž•‘ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤͺ ‡‹•‘”ƒ–›‡
ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤͳ͵ ‹‘–Š›
Ǥƒ™•‘ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤͳͷ ”ƒ†
‡ŽŽ‡”ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤͳͻ ›ƒ‘—‰Žƒ•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤʹͳ Related Experience ..........................................................................................................................23 Sample Plan Review Correction Lists & Forms .........................................................................24 Project Schedule ...............................................................................................................................25 Cost Data .............................................................................................................................................25 Statement of Compliance ................................................................................................................25 Local Experience MattersǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤʹͷ NonǦDiscriminationǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤʹ͸ Included with Submittal:ʹͲʹͶ

‡‘–‡
А‹
ƒŽ”‘ˆ‡••‹‘ƒŽ ‡‡
Ї†—އ
532

Page 1 ends

Background and Approach


‡‘–‡
А‹
ƒŽǡ

Ǥ ™ƒ• ˆ‘—†‡† ‹ ƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒ –‘ ’”‘˜‹†‡ ‹‘˜ƒ–‹˜‡ •‘Ž—–‹‘• –‘

‘’އ𠉇‘–‡
А‹
ƒŽ ’”‘„އ•Ǥ ‡ •–”‹˜‡ –‘
‘„‹‡ ‘—” „”‘ƒ† ‡š’‡”‹‡
‡ ‹ –Ї ‰‡‘–‡
А‹
ƒŽ
‹†—•–”›™‹–Š‘—”‘†‡”ƒ’’”‘ƒ
Ї•–‘’”‘˜‹†‡‘—”
Ž‹‡–•™‹–Їˆˆ‡
–‹˜‡ƒ†‡ˆˆ‹
‹‡–‰‡‘–‡
А‹
ƒŽ

‘•—Ž–‹‰ǤЇ

‡‘–‡
А‹
ƒŽ–‡ƒ‹
Ž—†‡•Š‹‰ŠŽ›‡†—
ƒ–‡†ƒ†Ž‹
‡•‡†’”‘ˆ‡••‹‘ƒŽ•‹
Ž—†‹‰
”‡‰‹•–‡”‡†‰‡‘–‡
А‹
ƒŽ‡‰‹‡‡”•ȋ
ǤǤȌƒ†
‡”–‹ˆ‹‡†‡‰‹‡‡”‹‰‰‡‘Ž‘‰‹•–•ȋǤǤ
ǤȌǤ‡†”ƒ™‘‘—”
–‡
А‹
ƒŽ ‘™Ž‡†‰‡ ƒ† ‡š–‡•‹˜‡ ‹†—•–”› ‡š’‡”‹‡
‡ –‘ ‡ˆˆ‹
‹‡–Ž› •‡”˜‡ ‘—”
Ž‹‡–ǯ• ‡‡†•Ǥ ‡
’”‘˜‹†‡ •–”ƒ‹‰Š–ˆ‘”™ƒ”†ǡ
‘•–Ǧ‡ˆˆ‡
–‹˜‡ ‡‰‹‡‡”‹‰ •‘Ž—–‹‘• –‘
‘’އ𠇐‰‹‡‡”‹‰ ’”‘„އ•Ǥ —”
•‡‹‘” ƒ†ƒƒ‰‡‡–އ˜‡Ž ’‡”•‘‡Ž Šƒ˜‡ ƒŽ‘‰ Š‹•–‘”›™‹–Š‹ –Ї‹†—•–”› ƒ† ‘˜‡” –Ї ›‡ƒ”• Šƒ˜‡‰ƒ‹‡†–Ї”‡•’‡
–‘ˆ‘—”
Ž‹‡–•ƒ†’”‘ˆ‡••‹‘ƒŽ‡„‡”•™‹–Š‹–Ї‰‡‘–‡
А‹
ƒŽ
‘—‹–›Ǥ
—”
Ž‹‡–• ‹
Ž—†‡ ‹†‹˜‹†—ƒŽ•ǡ ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡”•ǡ ƒ”
Š‹–‡
–•ǡ •
Š‘‘Ž †‹•–”‹
–•ǡ ‹•—”ƒ
‡

‘’ƒ‹‡•ǡŽƒ™›‡”•ǡ
‘‡”
‹ƒŽ†‡˜‡Ž‘’‡”•ǡ †‡•‹‰’”‘ˆ‡••‹‘ƒŽ•ǡŽ‘
ƒŽ‰‘˜‡”‡–•ǡ—‹
‹’ƒŽ‹–‹‡•ǡ
—–‹Ž‹–›
‘’ƒ‹‡•ǡ ƒ† ’—„Ž‹
 ƒ‰‡
‹‡•Ǥ ††‹–‹‘ƒŽŽ›ǡ ™‡ Šƒ˜‡ ”‡
‡–Ž› ’”‘˜‹†‡†ǡ ‘” ƒ”‡
—””‡–Ž›
’”‘˜‹†‹‰ǡ’”‘ˆ‡••‹‘ƒŽ
‘•—Ž–‹‰•‡”˜‹
‡•ˆ‘”–Ї‹–›‘ˆ
‡ƒ•‹†‡ƒ–‡”–‹Ž‹–‹‡•‡’ƒ”–‡–ǡ‘—–Š
‘ƒ•–ƒ–‡”‹•–”‹
–ǡ ƒ‰—ƒ‡ƒ
Š ‘—–›ƒ–‡”‹•–”‹
–ǡ –Ї
”˜‹‡ƒ
Šƒ–‡”‹•–”‹
–ǡ‘—Ž–‘
‹‰—‡Žƒ–‡”‹•–”‹
–ǡƒ†˜ƒ”‹‘—•‹–‹‡•‹
Ž—†‹‰ǣ‘‘ƒǡŠ‹‘
‹ŽŽ•ǡƒŠ‡‹ǡƒއ‡–‡ǡƒ

—ƒ ƒ’‹•–”ƒ‘ǡ ƒƒ ‘‹–ǡ ƒ”Ž•„ƒ†ǡ
”˜‹‡ ƒ† ƒ‡ ‘”‡•–Ǥ ‡ ƒ”‡
—””‡–Ž› ’”‘˜‹†‹‰ ‘Ǧ
ƒŽŽ
‰‡‘–‡
А‹
ƒŽ’Žƒ
Ї
‹‰•‡”˜‹
‡•ȋ–Š‹”†’ƒ”–›”‡˜‹‡™Ȍ ˆ‘” –Ї‹–›‘ˆƒއ‡–‡ƒ† –Ї‹–›‘ˆ ƒ
—ƒƒ’‹•–”ƒ‘ǤЇƒŒ‘”‹–›‘ˆ‘—”
Ž‹‡–•
‘‡ˆ”‘”‡ˆ‡””ƒŽ•‘””‡’‡ƒ–„—•‹‡••Ǥ


‡‘–‡
А‹
ƒŽ Šƒ• ‡š–‡•‹˜‡ ‡š’‡”‹‡
‡ ™‹–Š Š‹ŽŽ•‹†‡ ‰”ƒ†‹‰ ˆ”‘ •–ƒ†ƒ”† ‡ƒ”–Š ‘˜‹‰ –‡
А‹“—‡••—
Šƒ••Їƒ”‡›•ƒ†‡ƒ”–Š„—––”‡••‡•ǡ–‘•–ƒ–‡Ǧ‘ˆǦ–ЇǦƒ”––‡ А‹“—‡••—
Šƒ•†‡™ƒ–‡”‹‰
•›•–‡•ǡ–‹‡„ƒ
•ǡ•‘‹Žƒ‹Ž™ƒŽŽ•ǡ
ƒ‹••‘•ƒ†•Їƒ”’‹•Ǥ

‡‘–‡
А‹
ƒŽ‹•ƒ’”‡‹‡”‰‡‘–‡
А‹
ƒŽ

‘•—Ž–ƒ–‹•Ž‘’‡•–ƒ„‹Ž‹œƒ–‹‘ƒ†—†‡”•–ƒ†•Š‘™–‘†‡•‹‰ƒ†‹’އ‡–•—

‡••ˆ—އ‰‹‡‡”‹‰
•‘Ž—–‹‘•–‘‹–‹‰ƒ–‡ƒ†˜‡”•‡‰‡‘Ž‘‰‹

‘†‹–‹‘•Ǥ•‡š’‡”–•‹–Š‹•ˆ‹‡Ž†ǡ™‡Šƒ˜‡ƒŽ•‘’”‘˜‹†‡†–Š‹”†Ǧ ’ƒ”–›‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™•‡”˜‹
‡•ˆ‘”—‡”‘—•
‘’ƒ‹‡•ƒ†Ž‘
ƒŽƒ‰‡
‹‡•Ǥ
—”
‘–‹—‡†‹˜‘Ž˜‡‡–™‹–Š•‘‡‘ˆ‘—–Ї”ƒŽ‹ˆ‘”‹ƒǯ•Žƒ”‰‡•–†‡˜‡Ž‘’‡”•‹•ƒ–‡•–ƒ‡––‘–Ї “—ƒŽ‹–› ‘ˆ ‘—” •–ƒˆˆ ƒ† އ˜‡Ž ‘ˆ •‡”˜‹
‡ ™‡ ’”‘˜‹†‡Ǥ
 –Ї Žƒ•– ͷ ›‡ƒ”•ǡ ‘—” ’‡”•‘‡Ž Šƒ˜‡ „‡‡
”‡•’‘•‹„އˆ‘”–Ї‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‹–Ї†‡˜‡Ž‘’‡–‘ˆ‘˜‡”ͷǡͲͲͲ”‡•‹†‡–‹ƒŽ—‹–•ǡͳǡͲͲͲǡͲͲͲ •“—ƒ”‡ ˆ‡‡–‘ˆ
‘‡”
‹ƒŽƒ†”‡–ƒ‹Ž•–”—
–—”‡•ǡʹͷ‹Ž‡•‘ˆ’”‹˜ƒ–‡ƒ†’—„Ž‹
•–”‡‡–•ǡƒ†‘˜‡”ͳͲͲ
‹Ž‡•‘ˆ—–‹Ž‹–›‹’”‘˜‡‡–•Ǥ


‡‘–‡
А‹
ƒŽǯ•
‘”’‘”ƒ–‡ ’Ћޑ•‘’Š›
‘„‹‡•
‘‹–‡–ǡ ‘–‹˜ƒ–‹‘ǡ ƒ† –‡ƒ™‘” –‘
’”‘˜‹†‡‘—”
Ž‹‡–•™‹–Š“—ƒŽ‹–›™‘”‹ƒ–‹‡Ž›ƒ†’”‘ˆ‡••‹‘ƒŽƒ‡”Ǥ •‡š’‡”–•‹‘—” ˆ‹‡Ž†ǡ

‡‘–‡
А‹
ƒŽ‹•™‡ŽŽ•—‹–‡† –‘•‡”˜‡ƒ• –Ї‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™‡” ˆ‘” –Ї
‹–›‘ˆƒއ‡–‡Ǥ—”•‡”˜‹
‡•ƒ”‡•‘—‰Š–ƒˆ–‡”‹–Š‹•”‘އǤ•†‹•
—••‡†ƒ„‘˜‡™‡Šƒ˜‡’”‘˜‹†‡†
•‹‹Žƒ” •‡”˜‹
‡• ˆ‘” •‡˜‡”ƒŽ Œ—”‹•†‹
–‹‘•Ǥ • ‰‡‘–‡
А‹
ƒŽ ”‡˜‹‡™‡” ˆ‘” –Ї ‹–› ‘ˆ ƒ އ‡–‡ ‘—”
‰‘ƒŽ™‹ŽŽ„‡ –‘‡•—”‡ –Šƒ– –Ї†‘
—‡–•™‡”‡˜‹‡™ƒ”‡ –‘ –Ї •–ƒ†ƒ”†‘ˆ
ƒ”‡‹ –Ї‰‡‘–‡
А‹
ƒŽ
‹†—•–”›ƒ†‡‡––Ї”‡“—‹”‡‡–•‘ˆ–Ї‹–›‘ˆƒއ‡–‡ƒ†–ƒ–‡‘ˆƒŽ‹ˆ‘”‹ƒǤ‡ƒ–‹ ‹’ƒ–‡
‘—”•‡”˜‹
‡•™‹ŽŽ‹
Ž—†‡”‡˜‹‡™‘ˆ‰‡‘–‡
А‹
ƒŽƒ†‰‡‘Ž‘‰‹
•—„‹––ƒŽ•‹
Ž—†‹‰”‡’‘”–•ƒ†”‡Žƒ–‡†
’Žƒ•ǡ‰”ƒ†‹‰ƒ†
‘•–”—
–‹‘’Žƒ•ǡŽ‹“—‡ˆƒ
–‹‘‡˜ƒŽ—ƒ–‹‘•ǡ’ƒ˜‡‡–†‡•‹‰•ǡ
‘’ƒ
–‹‘”‡’‘”–•ǡ
ƒ†”‡–ƒ‹‹‰™ƒŽŽ’Žƒ•ƒ†
ƒŽ
—Žƒ–‹‘•ȋ‹
Ž—†‹‰ǣ‡
Šƒ‹
ƒŽŽ›•–ƒ„‹Ž‹œ‡†‡ƒ”–Š™ƒŽŽ•ǡ
ƒ‹••‘™ƒŽŽ•ǡ
–‹‡Ǧ„ƒ
 ™ƒŽŽ•ǡ ƒ† ƒ‹Ž ™ƒŽŽ•Ȍǡ ƒ† ‘–Ї” ‹–‡• –Šƒ– ˆƒŽŽ —†‡” ‘—” ‰‡‘–‡ А‹
ƒŽ ’—”˜‹‡™Ǥ
 –Š‹•

ƒ’ƒ
‹–›ǡ™‡™‹ŽŽƒŽ•‘ „‡ƒ˜ƒ‹Žƒ„އ ˆ‘”‡‡–‹‰•ǡ –‡Ž‡’Š‘‡ƒ†‡ƒ‹Ž ‘•—Ž–ƒ–‹‘• ˆ‘” „‘–Š –Ї ‹–›
533

Page 2 ends

ƒ† –Ї •—„‹––‡”•Ǥ
–ƒ› ƒŽ•‘ „‡ ‡
‡••ƒ”› –‘ ’‡”ˆ‘” •‹–‡ ˜‹•‹–•ƒ†
‘•—Ž–‹‰™‹–Š •‘‡ ‘ˆ –Ї
‘”‡
‘’Ž‹
ƒ–‡†•‹–‡•–‘
‘ˆ‹”–Ї•‹–‡‰‡‘–‡
А‹
ƒŽ
‘†‹–‹‘•ƒ”‡„‡‹‰ƒ’’”‘’”‹ƒ–‡Ž›ƒ††”‡••‡†
„› –Ї ’”‘Œ‡
– ‰‡‘–‡
А‹
ƒŽ
‘•—Ž–ƒ–Ǥ ˆ
‘—”•‡ǡ 

‡‘–‡
А‹
ƒŽ ‹• ƒ˜ƒ‹Žƒ„އ ƒ– ƒŽŽ –‹‡• ™Š‡
‡‡”‰‡
› Žƒ† ‹•–ƒ„‹Ž‹–‹‡• ‘

—” –‘ ƒ••‹•– ™‹–Š –Ї ‹–‹‡• ‡‡†•Ǥ ‡ ™‹ŽŽ „‡ ”‡ƒ†‹Ž› ƒ˜ƒ‹Žƒ„އ –‘ ’”‘˜‹†‡‰‡‘–‡
А‹
ƒŽ
‘•—Ž–‹‰•‡”˜‹
‡• ˆ‘”ƒŽŽ†‹˜‹•‹‘ƒ††‡’ƒ”–‡–•™‹–Š –Ї‹–›Ǥ—”‘ˆˆ‹ ‡‹•
Ž‘
ƒ–‡†‹ƒއ‡–‡ǡއ••–ŠƒͳǤͷ‹Ž‡•ˆ”‘–Ї‹–›‘ˆƒއ‡–‡‡’ƒ”–‡–‘ˆ‰‹‡‡”‹‰Ǥ Їˆ‘ŽŽ‘™‹‰‹•ƒ•—ƒ”›‘ˆ•‘‡‘ˆ–Ї•‡”˜‹
‡•™‡’”‘˜‹†‡Ǥ
Geotechnical Engineering
x ‹–‡‡
‘ƒ‹••ƒ
‡
x ŽƒЇ
‹‰ȋŠ‹”†ƒ”–›‡˜‹‡™Ȍ
x ‡ƒ•‹„‹Ž‹–›
˜‡•–‹‰ƒ–‹‘•
x
”‘—†
’”‘˜‡‡–
x
‡‘–‡
А‹
ƒŽ
ƒœƒ”†˜ƒŽ—ƒ–‹‘•
x ƒ†•Ž‹†‡
˜‡•–‹‰ƒ–‹‘•Ȁ–ƒ„‹Ž‹œƒ–‹‘•
x
‹ŽŽ•‹†‡
”ƒ†‹‰
x
”‘—†ƒ–‡”
˜‡•–‹‰ƒ–‹‘•
x ‹“—‡ˆƒ
–‹‘••‡••‡–•Ȁ‹–‹‰ƒ–‹‘
x ‡––އ‡–ƒŽ›•‹•
x ‡™ƒ–‡”‹‰‡•‹‰
x ”ƒ‹ƒ‰‡‡•‹‰
x Ž‡š‹„Ž‡ƒ˜‡‡–‡•‹‰
x ƒ–‡”ƒŽ’”‡ƒ†‹‰
x ’‡
‹ƒŽ
•’‡
–‹‘‡”˜‹
‡•
x ‡–ƒ‹‹‰ƒŽŽ•
x ‡
Šƒ‹
ƒŽŽ›–ƒ„‹Ž‹œ‡†ƒ”–ŠƒŽŽ•
x ‹•–”‡••
˜‡•–‹‰ƒ–‹‘•
x
‡‘–‡
А‹
ƒŽ‡‡”‡˜‹‡™ 
x ‡†‹ƒ–‹‘ƒ†”„‹–”ƒ–‹‘—’’‘”–
x 𒇔–‹–‡••‘•—Ž–ƒ–‹‘Ȁ‡•–‹‘›
x 𒇔–ƒ‡Žƒ”–‹
‹’ƒ–‹‘
x ‘—†ƒ–‹‘‰‹‡‡”‹‰
x
‡‘–‡
А‹
ƒŽ
•–”—‡–ƒ–‹‘
x ‘•–”—
–‹‘„•‡”˜ƒ–‹‘ƒ†‡•–‹‰
x
ˆ‹Ž–”ƒ–‹‘‡•–‹‰
x ƒŽ›•‹•‘ˆ‡’‘”ƒ”›š
ƒ˜ƒ–‹‘•
x ”‘•‹‘–—†‹‡•
x
ǦŠ‘—•‡ƒ„‘”ƒ–‘”›‡•–‹‰
x ƒ–‡”‹ƒŽ•‡•–‹‰
Engineering Geology
x ‹–‡‡
‘ƒ‹••ƒ
‡
x —„•—”ˆƒ
‡š’Ž‘”ƒ–‹‘
x
‡‘Ž‘‰‹
ƒ’’‹‰
x
‡‘Ž‘‰‹

ƒœƒ”†˜ƒŽ—ƒ–‹‘•
x ƒ—Ž–
˜‡•–‹‰ƒ–‹‘•
x ‘
 ƒŽŽ‘–‡–‹ƒŽ
x ‡‹•‹
˜ƒŽ—ƒ–‹‘•
x ‡‹•‹
‡•’‘•‡’‡
–”—
x ‹”Š‘–‘
–‡”’”‡–ƒ–‹‘
x ‹’’ƒ„‹Ž‹–›˜ƒŽ—ƒ–‹‘•
x Ž‘‘†
ƒœƒ”†‘–‡–‹ƒŽ
x ‡„”‹• Ž‘™˜ƒŽ—ƒ–‹‘•
Methodology


‡‘–‡
А‹
ƒŽ‹•
—””‡–Ž›‘”Šƒ•”‡
‡–Ž›’”‘˜‹†‡†–Š‹”†’ƒ”–›ȋ’‡‡”Ȍ‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™•‡”˜‹
‡•
ˆ‘”–Ї‹–›‘ˆƒއ‡–‡ƒ†–Ї‹–›‘ˆƒ
—ƒƒ’‹•–”ƒ‘Ǥ•‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™‡”•ˆ‘”–Ї‹–›ǡ
‘—”‰‘ƒŽ™‹ŽŽ„‡ –‘‡•—”‡ –Šƒ– –Ї –‡
А‹
ƒŽ†‘
—‡–•™‡”‡˜‹‡™ƒ”‡–‘ –Ї•–ƒ†ƒ”†‘ˆ
ƒ”‡‹ –Ї
‰‡‘–‡
А‹
ƒŽ‹†—•–”›ƒ†‡‡– –Ї”‡“—‹”‡‡–•‘ˆ –Ї‹–›‘ˆƒއ‡–‡ǡ–ƒ–‡‘ˆƒŽ‹ˆ‘”‹ƒƒ† ‘–Ї”ƒ’’Ž‹
ƒ„އ•–ƒ†ƒ”†•Ǥ

‡‘–‡
А‹
ƒŽ‹•˜‡”›ˆƒ‹Ž‹ƒ”™‹–Š–Ї‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ–ЇʹͲʹʹ
ƒŽ‹ˆ‘”‹ƒ—‹Ž†‹‰‘†‡ȋȌǡƒ†’‡
‹ƒŽ—„Ž‹
ƒ–‹‘ͳͳ͹Ǧ
—‹†‡Ž‹‡•ˆ‘”˜ƒŽ—ƒ–‹‘ƒ†‹–‹‰ƒ–‹‘
‡‹•‹

ƒœƒ”†•‹ ƒŽ‹ˆ‘”‹ƒ ȋʹͲͲͺȌǤ††‹–‹‘ƒŽŽ›ǡ 

‡‘–‡
А‹
ƒŽ‹• ˆƒ‹Ž‹ƒ”™‹–Š –Ї ‹–› ‘ˆƒ
އ‡–‡ǯ•
”ƒ†‹‰”†‹ƒ
‡ƒ†
”ƒ†‹‰ƒ—ƒŽǡ–Ї—‹Ž†‹‰–ƒ†ƒ”†•
‘–ƒ‹‡†‹–ЇƒŽ‹ˆ‘”‹ƒ
‘†‡‘ˆ‡‰—Žƒ–‹‘•ǡ‹–އʹͶƒ•™‡ŽŽƒ•ƒއ‡–‡—‹ ‹’ƒŽ‘†‡ƒ†Ž‘
ƒŽƒ‡†‡–•Ǥ
534

Page 3 ends

‡ƒ–‹
‹’ƒ–‡‘—”–Š‹”†’ƒ”–›”‡˜‹‡™‘ˆ‰‡‘–‡
А‹
ƒŽ”‡’‘”–•ƒ†
ƒŽ
—Žƒ–‹‘•™‹ŽŽ‹
Ž—†‡ǡ„—–™‹ŽŽ‘–
„‡Ž‹‹–‡†–‘ǣˆŽƒ–ǦŽƒ†ƒ†Š‹ŽŽ•‹†‡‰”ƒ†‹‰ǡŽ‹“—‡ˆƒ
–‹‘‡˜ƒŽ—ƒ–‹‘•ǡ•‡‹•‹
‡˜ƒŽ—ƒ–‹‘•ǡ•—”ˆ‹
‹ƒŽƒ†
‰Ž‘„ƒŽ •Ž‘’‡ •–ƒ„‹Ž‹–› ƒƒŽ›•‹•ǡ •‘‹Ž
‘’‘•‹–‹‘ǡ ’ƒ˜‡‡– †‡•‹‰ǡ Žƒ„‘”ƒ–‘”› –‡•– ”‡•—Ž–• ƒ† –Ї‹” ‹–‡”’”‡–ƒ–‹‘ǡ ˆ‘—†ƒ–‹‘ †‡•‹‰ǡ
‘’ƒ
–‹‘ ”‡’‘”–•ǡ ƒ† ”‡–ƒ‹‹‰ ™ƒŽŽ ’ƒ”ƒ‡–‡”• ȋ‹
Ž—†‹‰ǣ
‡
Šƒ‹
ƒŽŽ›•–ƒ„‹Ž‹œ‡†‡ƒ”–Š™ƒŽŽ•ǡ’‹Ž‡ƬŽƒ‰‰‹‰™ƒŽŽ•ǡ–‹‡Ǧ„ƒ ™ƒŽŽ•ǡƒ†ƒ‹Ž™ƒŽŽ•Ȍǡƒ†‘–Ї”‹–‡•
–Šƒ– ˆƒŽŽ—†‡”‘—”‰‡‘–‡
А‹
ƒŽ’—”˜‹‡™Ǥ
–ƒ›ƒŽ•‘„‡‡
‡••ƒ”› ˆ‘”—•–‘’‡”ˆ‘”ƒ•‹–‡˜‹•‹–ȋ•Ȍ‘”
ƒ––‡†”‡“—‡•–‡†‘ˆˆ‹
‡‡‡–‹‰•ˆ‘”•‘‡‘ˆ–Ї‘”‡
‘’Ž‹
ƒ–‡†’”‘Œ‡
–•Ǥ
• ™‡ Šƒ˜‡ †‘‡ ’”‡˜‹‘—•Ž› ˆ‘” –Ї ‹–› ƒ† ˆ‘” –Ї ‘–Ї” ‹–‹‡• ƒ† ’—„Ž‹  ƒ‰‡
‹‡• –Šƒ– ™‡ Šƒ˜‡
”‡’”‡•‡–‡†ǡ™‡™‹ŽŽƒ†˜‘
ƒ–‡ –Ї‹–› ‘ˆƒއ‡–‡ǯ•’‘•‹–‹‘‹‡‡–‹‰•ǡ’”‡•‡–ƒ–‹‘•ǡƒ†‹ ‘—”™”‹––‡”‡˜‹‡™”‡’‘”–•Ǥ•ƒ”‡•—Ž–‘ˆ™‘”‹‰™‹–Š‘–Ї”Ž‘ ƒŽ
‹–‹‡•ǡ

‡‘–‡
А‹
ƒŽ‹•’”‘ˆ‹
‹‡–
ƒ–”‡
‡‹˜‹‰ǡ–”ƒ
‹‰ǡƒ†•—

‡••ˆ—ŽŽ›
‘’އ–‹‰”‡˜‹‡™™‘”‘—‡”‘—•‹†‹˜‹†—ƒŽ’”‘Œ‡
–•‹ƒ
–‹‡Ž› ƒ† ’”‘ˆ‡••‹‘ƒŽ ƒ‡”Ǥ 

‡‘–‡
А‹
ƒŽ ‹• ˜‡”› ƒ

‘‘†ƒ–‹‰ ƒ†
ƒ ‡ƒ•‹Ž› ƒ†ƒ’– –‘
ˆ‘”ƒ––‹‰‘—””‡’‘”–•ƒ••’‡
‹ˆ‹‡†„›–Ї‹–›Ǥ


‡‘–‡
А‹
ƒŽ
އƒ”Ž›—†‡”•–ƒ†•–Ї”‘އ‘ˆ–Ї–Š‹”†Ǧ’ƒ”–›”‡˜‹‡™‡”ƒ†Š‘™‹’‘”–ƒ–‹–‹•–Šƒ– –Ї
‘‡–•„‡
އƒ”ǡ
‘
‹•‡ǡƒ† –Šƒ– –Ї”‡˜‹‡™‡”•Š‘—ކ‘–ƒ
–ƒ•ƒ„ƒ””‹‡”ǡ’”‘˜‹†‹‰ –Šƒ– –Ї
”‡’‘”–Šƒ••—ˆˆ‹
‹‡–†ƒ–ƒƒ†”‡ƒ•‘ƒ„އ”‡
‘‡†ƒ–‹‘•Ǥ‡ƒ”‡ƒŽ•‘
‘‰‹œƒ–‘ˆŠ‘™‡˜‡•ƒŽŽ
†‡Žƒ›• ƒ– –Ї ”‡˜‹‡™ •–ƒ‰‡
ƒ
ƒ—•‡ •‹‰‹ˆ‹
ƒ– —‡
‡••ƒ”› †‡Žƒ›• –‘ –Ї
‘’އ–‹‘ ‘ˆ ƒ ’”‘Œ‡
–Ǥ
††‹–‹‘ƒŽŽ›ǡ 

‡‘–‡
А‹
ƒŽǯ• ‡š’‡”‹‡
‡ Šƒ• •Š‘™ –Šƒ– ‘ˆ–‡ –Ї ƒ’’”‘˜ƒŽ ‘ˆ –Ї ”‡’‘”– ƒ „‡
ˆƒ
‹Ž‹–ƒ–‡†„›•‹’Ž›
ƒŽŽ‹‰ƒ†•’‡ƒ‹‰†‹”‡
–Ž› –‘ –Ї‡‰‹‡‡”•ƒ†Ȁ‘”‰‡‘Ž‘‰‹•–•™Š‘•‹‰‡† –Ї ”‡’‘”– ƒ† ”‡“—‡•– •—’’އ‡–ƒŽ ‹ˆ‘”ƒ–‹‘ ‘” ƒ ‡š’Žƒƒ–‹‘ ”ƒ–Ї” –Šƒ ™”‹–‹‰ —‡ ‡••ƒ”›
”‡˜‹‡™
‘‡–•ǤŽ–‹ƒ–‡Ž›–Š‹••—’’އ‡–ƒŽ‹ˆ‘”ƒ–‹‘‹•‹ ‘”’‘”ƒ–‡†‹–‘–Ї†‡•‹‰†‘
—‡–ǡ
ƒ†‹–ƒ

‡Ž‡”ƒ–‡•–Ї”‡˜‹‡™’”‘
‡••ƒ†”‡†—
‡•‘˜‡”ƒŽŽ
‘•–Ǥ


‡‘–‡
А‹
ƒŽ™‹ŽŽ‘–‘Ž›”‡Ž›‘‘—”‡š’‡”‹‡
‡ƒ•ƒ”‡˜‹‡™‡”ǡ„—–™‡™‹ŽŽƒŽ•‘†”ƒ™ ˆ”‘‘—”
‡š’‡”‹‡
‡‘ˆŠƒ˜‹‰„‡‡”‡˜‹‡™‡†ǤŠ”‘—‰Š‘—”‡š–‡•‹˜‡‡š’‡”‹‡ ‡‹ –Ї‹†—•–”›ǡ™‡Šƒ˜‡Šƒ†
—‡”‘—• ”‡’‘”–• ”‡˜‹‡™‡† „› ˜ƒ”‹‘—• ”‡˜‹‡™‡”•Ǥ ‡”ˆ‘”‡† ƒ’’”‘’”‹ƒ–‡Ž›ǡ –Ї –Š‹”†Ǧ’ƒ”–› ”‡˜‹‡™

ƒ„‡ƒ‹’‘”–ƒ––‘‘Ž–‘‡•—”‡ƒƒ’’”‘’”‹ƒ–‡އ˜‡Ž‘ˆ ƒ”‡Šƒ•„‡‡ƒ
Š‹‡˜‡†ƒ†–Šƒ––Ї”‡’‘”–
Šƒ• ƒ’’”‘’”‹ƒ–‡Ž›
‘•‹†‡”‡† –Ї •‹–‡ ‰‡‘–‡
А‹
ƒŽ
‘†‹–‹‘• ƒ† –Ї ‹–›ǯ• ”‡“—‹”‡‡–•Ǥ ‡
—†‡”•–ƒ†–Šƒ–”‡˜‹‡™••Š‘—ކ„‡’‡”ˆ‘”‡†„›‡š’‡”‹‡ ‡†“—ƒŽ‹ˆ‹‡†’”‘ˆ‡••‹‘ƒŽ•–Šƒ–ƒ”‡
—””‡–
™‹–Š–Ї‹†—•–”›•–ƒ†ƒ”†‘ˆ
ƒ”‡ƒ†Šƒ˜‡„‡‡ƒ†ƒ”‡
—””‡–Ž›‹˜‘Ž˜‡†™‹–Š’”‘Œ‡
–•
‘’ƒ”ƒ„އ
–‘ –Š‘•‡ –Ї›ƒ”‡”‡˜‹‡™‹‰Ǥ

‡‘–‡
А‹
ƒŽŠƒ•Ž‘
ƒŽ‡š’‡”‹‡
‡‘•‹‰Ž‡ ˆƒ‹Ž›ƒ†—Ž–‹Ǧˆƒ‹Ž›
”‡•‹†‡–‹ƒŽǡ
‘‡”
‹ƒŽǡ ‹†—•–”‹ƒŽǡ ƒ† •Ž‘’‡ ”‡’ƒ‹” ’”‘Œ‡
–•Ǥ
 ‘—” ‘’‹‹‘ǡ ‹– ‹•
”‹–‹
ƒŽ –Šƒ– –Ї
‡š’‡”‹‡
‡ƒ†“—ƒŽ‹ˆ‹
ƒ–‹‘•‘ˆ –Ї”‡˜‹‡™‡”••Š‘—ކ‡‡–‘”‡š
‡‡† –Šƒ–‘ˆ –Їƒ’’Ž‹
ƒ–Ǥ‡Šƒ˜‡
‡š’‡”‹‡
‡™‹–Š ƒ† —†‡”•–ƒ† –Ї ˆ”—•–”ƒ–‹‘ ‘ˆ „‡‹‰ ”‡˜‹‡™‡† „› •ƒŽŽ ˆ‹”•™Š‘ ‘ˆ–‡ †‘ ‘– Šƒ˜‡‡š’‡”‹‡
‡‘”‘™Ž‡†‰‡”‡‰ƒ”†‹‰–Ї–›’‡‘ˆ’”‘Œ‡
––Ї›ƒ”‡ƒ•‡†–‘”‡˜‹‡™Ǥ‹‹Žƒ”Ž›ǡ•‘‡
”‡˜‹‡™‡”•†‘‘–•‡‡–‘—†‡”•–ƒ†–Šƒ–Dz•–ƒ†ƒ”†‘ˆ
ƒ”‡dz‹••—„Œ‡
–‹˜‡ƒ†‡‡†•–‘„‡•
ƒŽ‡†–‘–Ї
’”‘Œ‡
–Ǥ  ƒ††‹–‹‘ –‘ ƒ •‹‰Ž‡Ǧˆƒ‹Ž› Š‘‡ ‹ ‘•– ƒ•‡• †‘‡• ‘– ™ƒ””ƒ– –Ї •ƒ‡ އ˜‡Ž ‘ˆ
‡˜ƒŽ—ƒ–‹‘ ƒ• ƒ –”ƒ
– †‡˜‡Ž‘’‡– ‹˜‘Ž˜‹‰ •‡˜‡”ƒŽ Š‘‡•Ǥ Ї ”‡˜‹‡™‡” —•– ƒŽ•‘ ”‡ ‘‰‹œ‡ –Šƒ–
”‡‰ƒ”†Ž‡••‘ˆ–Ї•‹œ‡‘ˆ–Ї’”‘Œ‡
–ǡ–Ї‰‡‘–‡
А‹
ƒŽ”‡’‘”–—•–‹†‡–‹ˆ›ƒ†ƒ’’”‘’”‹ƒ–‡Ž›ƒ††”‡••
‰‡‘–‡
А‹
ƒŽ‹••—‡•™Š‹
Šƒ›„‡†‡–”‹‡–ƒŽ–‘–Ї’”‘Œ‡
–ƒ†‡š‹•–‹‰†‡˜‡Ž‘’‡–ǡ•—
Šƒ••‡––Ž‹‰
ˆ‹ŽŽ•ǡ‘˜‡”Ǧ•–‡‡’‡‡†ƒ–—”ƒŽƒ†ˆ‹ŽŽ•Ž‘’‡•ǡ‡–
Ǥ•‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™‡”ˆ‘”–Ї‹–›‘ˆƒއ‡–‡
‘—””‡˜‹‡™•™‹ŽŽ„‡’‡”ˆ‘”‡†„›‘—”‡š’‡”‹‡
‡†ǡ–ƒ–‡‘ˆƒŽ‹ˆ‘”‹ƒŽ‹
‡•‡†ǡ
‡‘–‡
А‹
ƒŽ‰‹‡‡”•
ƒ† ‰‹‡‡”‹‰
‡‘Ž‘‰‹•–•Ǥ
 ‘•–
ƒ•‡•ǡ „‘–Š ƒ
‡‘–‡
А‹
ƒŽ ‰‹‡‡” ƒ† ‰‹‡‡”‹‰
‡‘Ž‘‰‹•–
™‹ŽŽ”‡˜‹‡™‡ƒ
Š•—„‹––ƒŽ–‘
‘ˆ‹”–Šƒ–ƒ’’”‘’”‹ƒ–‡•–ƒ†ƒ”†‘ˆ
ƒ”‡ˆ‘”„‘–І‹•
‹’Ž‹‡•Šƒ•„‡‡
‡–„›–Їƒ’’Ž‹
ƒ–•ǯ
‘•—Ž–ƒ–Ǥ
535

Page 4 ends

—”‡š–‡•‹˜‡‡š’‡”‹‡
‡ƒ†‘™Ž‡†‰‡‘ˆ–ЇŽ‘
ƒŽ‰‡‘Ž‘‰‹

‘†‹–‹‘•™‹ŽŽ„‡ƒƒ••‡––‘‘—”ƒ„‹Ž‹–›
–‘ ”‡˜‹‡™ –Ї ”‡’‘”–• ‘ˆ ƒ’’Ž‹
ƒ–• ˆ‘” ’”‘Œ‡
–• ™‹–Š‹ ƒ އ‡–‡Ǥ
– ‹• ’ƒ”– ‘ˆ –Ї ”‡˜‹‡™‡”•ǯ
”‡•’‘•‹„‹Ž‹–› –‘ —†‡”•–ƒ† –Ї Ž‘
ƒŽ
‘†‹–‹‘• ƒ†
‘•–”ƒ‹–•ǡ –‘ ‡•—”‡ –Šƒ– –Ї› Šƒ˜‡ „‡‡
ƒ’’”‘’”‹ƒ–‡Ž›
‘•‹†‡”‡†„›–Їƒ’’Ž‹
ƒ–•ǯ
‘•—Ž–ƒ–ƒ†–Šƒ––Ї”‡
‘‡†ƒ–‹‘•ƒ†’ƒ”ƒ‡–‡”•
’”‘˜‹†‡†„›–Ї
‘•—Ž–ƒ–ƒ’’”‘’”‹ƒ–‡Ž›”‡ˆŽ‡
––Ї•‡
‘†‹–‹‘•Ǥ‘
ƒŽ‡š’‡”‹‡
‡ƒ†‘™Ž‡†‰‡ƒ”‡
‡••‡–‹ƒŽ ‹ †‡ƒŽ‹‰ ™‹–Š –Ї ƒ’‹•–”ƒ‘ ƒ† ‘–‡”‡› ‘”ƒ–‹‘•ǡ ™Š‹ Š
‘’”‹•‡ ‘•– ‘ˆ ƒ
އ‡–‡ǡƒ†‹’ƒ”–‹
—Žƒ”–ЇŽƒ†•Ž‹†‡•ƒ†•Ž‘’‡•–ƒ„‹Ž‹–›‹••—‡•–Šƒ–‘

—”™‹–Š‹–ЇǤЇ–Š‹ǡ
™‡ƒǡ ”‡Žƒ–‹˜‡Ž› ˆŽƒ–ǦŽ›‹‰
Žƒ› „‡†• —’‘ ™Š‹
Š ‘•– Žƒ†•Ž‹†‡• ‘

—” ‹ –Ї ƒ”‡ƒ ƒ”‡ †‹ˆˆ‹
—Ž– –‘
‹†‡–‹ˆ›ƒ†ƒ’’”‘’”‹ƒ–‡Ž›‘†‡ŽǤ”–‹ˆ‹
‹ƒŽˆ‹ŽŽƒ–‡”‹ƒŽǡ†‡”‹˜‡†ˆ”‘–ЇŽ‘
ƒŽƒ–‹˜‡ƒ–‡”‹ƒŽ•ǡ
ƒ„‡
’”‘‡ –‘ •‡––އ‡–ǡ •Ž‘’‡
”‡‡’ ƒ† •—”ˆ‹
‹ƒŽ ˆƒ‹Ž—”‡•Ǥ Ї Ž‘
ƒŽ •‘‹Ž• ƒ”‡ Š‹‰ŠŽ› ‡š’ƒ•‹˜‡ ƒ†

‘””‘•‹˜‡ –‘
‘
”‡–‡ ƒ† •–‡‡ŽǤ
– ‹•
”‹–‹
ƒŽ –Šƒ– –Ї ‹–›ǯ• ”‡˜‹‡™‡” Šƒ˜‡ ‡š–‡•‹˜‡ ‡š’‡”‹‡ ‡ ƒ†
‘™Ž‡†‰‡‘ˆ–Ї‰‡‘Ž‘‰‹

‘†‹–‹‘•‹ƒއ‡–‡–‘‡•—”‡–Šƒ–‘–Ї”
‘•—Ž–ƒ–•™‘”‹‰‹–Ї
‹–›ƒ”‡ƒ’’”‘’”‹ƒ–‡Ž›
‘•‹†‡”‹‰ƒ†ƒ††”‡••‹‰–ЇŽ‘
ƒŽ
‘†‹–‹‘•Ǥ
Work Plan


‡‘–‡
А‹
ƒŽ™‹ŽŽ
‘–‹—‡ –‘—•‡‘—”’”‘˜‡™‘”’ŽƒǤ
‡ƒ”‡“—‡•–Šƒ•„‡‡”‡
‡‹˜‡† ˆ”‘
–Ї‹–›–‘’‡”ˆ‘”ƒ–Š‹”†Ǧ’ƒ”–›”‡˜‹‡™ˆ‘”ƒ”‡’‘”–ƒ†Ȁ‘”’Žƒ•—„‹––ƒŽǡ™‡™‹ŽŽ’‡”ˆ‘”ƒ —”•‘”›
”‡˜‹‡™ ‘ˆ –Ї †‘
—‡–• ƒ† †‹•
—•• –Ї ’”‘Œ‡
–™‹–Š –Ї ‹–›ǯ• ”‡’”‡•‡–ƒ–‹˜‡Ǥ‡™‹ŽŽ †‹•
—•• –Ї
•
Ї†—އǡ‡š’‡
–ƒ–‹‘•ƒ†”‡“—‹”‡‡–•‘ˆ–Ї‹–›ˆ‘”–Ї’”‘Œ‡
–ƒ†™‹ŽŽ’”‘˜‹†‡ƒ
‘•–‡•–‹ƒ–‡ˆ‘”
‘—”•‡”˜‹
‡•ƒ

‘”†‹‰Ž›Ǥ›’‹
ƒŽŽ›ǡƒŽŽ‘ˆ‘—”™‘”™‹ŽŽ„‡’‡”ˆ‘”‡†‹‘—”ƒއ‡–‡‘ˆˆ‹ ‡Ǥ
•‘‡‘

ƒ•‹‘•‡‡–‹‰•ƒ––Ї‹–›ƒ›„‡”‡“—‹”‡†‘”ƒ––Ї•‹–‡–‘‘„•‡”˜‡–Ї‰‡‘Ž‘‰‹ 
‘†‹–‹‘•
‹’‡”•‘Ǥ
‡’‡†‹‰‘–Ї‡’Šƒ•‹•‘ˆ–Ї†‘
—‡–••—„‹––‡†ǡ–Ї”‡˜‹‡™’”‘
‡••™‹ŽŽ„‡‹‹–‹ƒ–‡†„›‡‹–Ї”
ƒ
‡‘–‡
А‹
ƒŽ‰‹‡‡”‘”ƒ‰‹‡‡”‹‰
‡‘Ž‘‰‹•–ˆ”‘‘—”‘ˆˆ‹
‡ǤЇ•—„‹––‡††‘
—‡–•™‹ŽŽ„‡

Ї
‡†ˆ‘”
‘’Ž‹ƒ
‡™‹–Šƒ’’Ž‹
ƒ„އ
‘†‡•ƒ†•–ƒ†ƒ”†‘ˆ
ƒ”‡Ǥ’”‡Ž‹‹ƒ”›”‡˜‹‡™•Ї‡–™‹ŽŽ„‡
‰‡‡”ƒ–‡† •—ƒ”‹œ‹‰ ‘—” ˆ‹†‹‰• ƒ†
‘‡–• ”‡‰ƒ”†‹‰ –Ї •—‹–ƒ„‹Ž‹–› ‘ˆ –Ї †‘
—‡–• ƒ†
‹
Ž—†‹‰•’‡
‹ˆ‹
“—‡•–‹‘•ƒ†
‘‡–•ˆ‘”–Ї
‘•—Ž–ƒ–™Š‡”‡
Žƒ”‹ˆ‹
ƒ–‹‘‹•”‡“—‹”‡†‘”™Š‡”‡
‘‹••‹‘•ƒ”‡‘–‡†Ǥ—”‰‹‡‡”•ǯ‘”
‡‘Ž‘‰‹•–•ǯ
‘—–‡”’ƒ”–™‹ŽŽ–Ї”‡˜‹‡™–Ї•ƒ‡†‘
—‡–•
ƒ†–Ї’”‡Ž‹‹ƒ”›”‡˜‹‡™•Ї‡–ǤЇ”‡˜‹‡™•Ї‡–™‹ŽŽ„‡ƒ††‡†–‘ǡ–‘”‡ˆŽ‡ ––Ї‹’—–ƒ†
‘
‡”•
‘ˆ „‘–Š †‹•
‹’Ž‹‡•Ǥ Ї ˆ‹†‹‰• ‘ˆ ‘—” ”‡˜‹‡™ ™‹ŽŽ „‡ †‹• —••‡† ™‹–Š –Ї ‹–› –‘
‘ˆ‹” –Ї‹”
‡š’‡
–ƒ–‹‘• ƒ”‡ ‡–Ǥ
 •‘‡
ƒ•‡•ǡ ‹– ƒ› ƒŽ•‘ „‡ ’”—†‡– –‘
‘–ƒ
– –Ї ƒ’’Ž‹
ƒ–•ǯ
‘•—Ž–ƒ–
†‹”‡
–Ž› –‘ †‹•
—•• ‡‡†‡† •—’’އ‡–ƒŽ ‹ˆ‘”ƒ–‹‘ ƒ†Ȁ‘”
Žƒ”‹ˆ‹
ƒ–‹‘ ‘ˆ •’‡
‹ˆ‹
 ‹–‡• ‹ –Ї‹”
”‡’‘”– ’”‹‘” –‘
‘’އ–‹‰ ‘—” ˆ‘”ƒŽ ”‡˜‹‡™ †‘
—‡–Ǥ  ˆ‹ƒŽ ”‡˜‹‡™ •Ї‡–ǡ ’”‡•‡–‹‰ ‘—”
“—‡•–‹‘•ǡ
‘‡–•ƒ†”‡
‘‡†ƒ–‹‘•ˆ‘”ƒ’’”‘˜ƒŽ‘”†‡‹ƒŽ™‹ŽŽ„‡‡†‹–‡†ǡˆ‘”ƒ––‡†ƒ†ˆ‹ƒŽ Šƒ”†
‘’‹‡•ƒ†‡Ž‡
–”‘‹

‘’‹‡•’”‡’ƒ”‡†ƒ†’”‘˜‹†‡†–‘–Ї‹–›ˆ‘”
‘•‹†‡”ƒ–‹‘ƒ††‹•–”‹„—–‹‘Ǥ
—„•‡“—‡––‘’”‘˜‹•‹‘‘ˆ‘—””‡˜‹‡™•Ї‡–ǡ™‡™‹ŽŽ„‡ƒ˜ƒ‹Žƒ„އ–‘†‹• —••‘—”ˆ‹†‹‰•™‹–Š–Ї‹–›ǡ
ƒ’’Ž‹
ƒ–ƒ†Ȁ‘”ƒ’’Ž‹
ƒ–ǯ•
‘•—Ž–ƒ–ǤЋއ™‡™‹ŽŽ„‡ƒ˜ƒ‹Žƒ„އ–‘ƒŽŽ˜‹ƒ‡ƒ‹Žǡ–‡Ž‡’Š‘‡ƒ†ˆ‘” ‹Ǧ’‡”•‘‡‡–‹‰•ǡ™‡™‹ŽŽ ‡‡’ –Ї ‹–› ƒ’’”ƒ‹•‡† ‘ˆ ƒŽŽ ’”‘Œ‡ –Ǧ”‡Žƒ–‡†
‘””‡•’‘†‡
‡• –‘ƒ‡
•—”‡–Ї‹–›ǯ•‡š’‡
–ƒ–‹‘•ƒ”‡‡–ƒ†„—†‰‡–•ƒ”‡‘–‡š
‡‡†‡†Ǥ
—„•‡“—‡– ”‡˜‹‡™• ‘ˆ ”‡•’‘•‡• ƒ† ƒ††‹–‹‘ƒŽ •—„‹––ƒŽ• ™‹ŽŽ „‡ ’‡”ˆ‘”‡† ‹ ƒ •‹‹Žƒ” ƒ‡” —–‹Ž‘—”‘”‹‰‹ƒŽƒ†’‘–‡–‹ƒŽ•—„•‡“—‡–”‡˜‹‡™
‘‡–•ƒ†“—‡•–‹‘•Šƒ˜‡„‡‡ƒ’’”‘’”‹ƒ–‡Ž›
ƒ††”‡••‡†ƒ†–Ї†‘
—‡–•ƒ”‡†‡‡‡†•—ˆˆ‹
‹‡–ˆ‘”‰‡‘–‡
А‹
ƒŽƒ’’”‘˜ƒŽǤ‡™‹ŽŽ’”‡’ƒ”‡ƒˆ‹ƒŽ
536

Page 5 ends

”‡˜‹‡™•Ї‡–ǡ‹†‹
ƒ–‹‰ƒ’’”‘’”‹ƒ–‡”‡•’‘•‡–‘‘—”“—‡•–‹‘•ƒ†
‘‡–•ƒ†”‡
‘‡†‹‰–Ї
’”‘Œ‡
–‘”ƒ††”‡••‡†ƒ•’‡
–•‘ˆ–Ї’”‘Œ‡
–ˆ‘”‹–›ƒ’’”‘˜ƒŽǤ


‡‘–‡
А‹
ƒŽ ‹• ˆƒ‹Ž‹ƒ” ™‹–Š –Ї —•‡ ‘ˆ ‡Ž‡
–”‘‹
 ’”‘‰”ƒ• •—
Š ƒ• Ž—‡„‡ƒǡ ǦŽƒǡ ‡–
Ǥ
Ї”‡ˆ‘”‡ǡ •Š‘—ކ –Ї ‹–› ‡Ž‡
– –‘ —•‡ –Ї•‡ ’”‘‰”ƒ• ˆ‘” ”‡˜‹‡™ •‡”˜‹
‡• ‹ –Ї ˆ—–—”‡ǡ 


‡‘–‡
А‹
ƒŽ™‹ŽŽ„‡’”‡’ƒ”‡†Ǥ
Project Organization and Staffing
Project Management


‡‘–‡
А‹
ƒŽǯ• –™‘ Š‹‰ŠŽ› ‡š’‡”‹‡
‡† ”‹
‹’ƒŽ•ǡ ”Ǥ ‡˜‹ ‘Ž•‘ ƒ† ”Ǥ ‡‹•
‘”ƒ–›‡
™‹ŽŽ‘˜‡”•‡‡ƒŽŽ‘ˆ‘—”•‡”˜‹
‡•ˆ‘”–Ї’”‘Œ‡
–Ǥ”Ǥ‘Ž•‘‹•”‡‰‹•–‡”‡†ƒ•ƒ‡”–‹ˆ‹‡†
‰‹‡‡”‹‰
‡‘Ž‘‰‹•– ‹ –Ї –ƒ–‡ ‘ˆ ƒŽ‹ˆ‘”‹ƒ ƒ† ”Ǥ ‘”ƒ–›‡  ‹• ”‡‰‹•–‡”‡† ƒ• ƒ

‡‘–‡
А‹
ƒŽ ‰‹‡‡” ‹ –Ї –ƒ–‡ ‘ˆ ƒŽ‹ˆ‘”‹ƒǤ ‘‡ ”‡˜‹‡™• ƒ› ƒŽ•‘ „‡ ’”‘˜‹†‡† „› ‘” ‹
Ž—†‡ –Ї •‡”˜‹
‡• ‘ˆ ”Ǥ ‹‘–Š› ƒ™•‘ǡ ›ƒ ‘—‰Žƒ• ƒ† ”Ǥ ”ƒ† ‡ŽŽ‡”Ǥ Ї•‡
‰‡–އ‡ƒ”‡”‡‰‹•–‡”‡†ƒ•
‡‘–‡
А‹
ƒŽ‰‹‡‡”•‹ –Ї–ƒ–‡‘ˆƒŽ‹ˆ‘”‹ƒƒ†”Ǥƒ™•‘ Šƒ• –Ї ”ƒ”‡ †‹•–‹
–‹‘ ‘ˆ ƒŽ•‘ „‡‹‰ †—‡Ž ”‡‰‹•–‡”‡† ƒ• ƒ ‡”–‹ˆ‹‡† ‰‹‡‡”‹‰ ‡‘Ž‘‰‹•– ƒ•
™‡ŽŽǤ ‹–Š ƒŽŽ ‘ˆ –Ї•‡ǡ Š‹‰ŠŽ› “—ƒŽ‹ˆ‹‡† ƒ† Ž‘ ƒŽŽ› ‡š’‡”‹‡
‡† ‰‡‘–‡
А‹
ƒŽ ’”‘ˆ‡••‹‘ƒŽ•
ƒ˜ƒ‹Žƒ„އ–‘’‡”ˆ‘””‡˜‹‡™•ǡ–Ї”‡™‹ŽŽƒŽ™ƒ›•„‡•‘‡‘‡ƒ˜ƒ‹Žƒ„އ–‘‡‡––Ї‹–›ǯ•‡‡†• ƒ† •
Ї†—އ• ƒ† ‘•– ‹’‘”–ƒ–Ž› –‘ ƒ„އ ’”‘˜‹†‡ “—ƒŽ‹ˆ‹‡†ǡ ‡š’‡”‹‡ ‡† ”‡˜‹‡™• ‘ˆ ƒŽŽ
˜ƒ”‹‡–› ‘ˆ ‰‡‘–‡
А‹
ƒŽ •—„‹––ƒŽ•Ǥ ŽŽ ‘ˆ –Ї•‡ ‰‡–އ‡ ™‹ŽŽ „‡ •—’’‘”–‡† „› ‘—” •–ƒˆˆ ‘ˆ Ž‹
‡•‡†ƒ†“—ƒŽ‹ˆ‹‡†‡‰‹‡‡”•ƒ†‰‡‘Ž‘‰‹•–•‹‘—”‘ˆˆ‹ ‡‹ƒއ‡–‡ǡƒ•‡‡†‡†Ǥ
‡˜‹‘Ž•‘ǡ”‹
‹’ƒŽ
‡‘Ž‘‰‹•–‘ˆ

‡‘–‡
А‹
ƒŽǡ‹•ƒ‡”–‹ˆ‹‡†‰‹‡‡”‹‰
‡‘Ž‘‰‹•–ƒ†
”‘ˆ‡••‹‘ƒŽ
‡‘Ž‘‰‹•–‹–Ї–ƒ–‡‘ˆƒŽ‹ˆ‘”‹ƒǤ”Ǥ‘Ž•‘Бކ•„‘–Šƒƒ Їޑ”‘ˆ
‹‡
‡‹

‡‘Ž‘‰› ƒ† ƒƒ•–‡”ǯ• †‡‰”‡‡ ‹
‡‘Ž‘‰‹
ƒŽ 
‹‡
‡• ƒ† Šƒ• ‘˜‡” ͵Ͳ ›‡ƒ”• ‘ˆ ‰‡‘–‡
А‹
ƒŽ

‘•—Ž–‹‰‡š’‡”‹‡
‡ǡ‘•–‘ˆ™Š‹
Š™ƒ•„ƒ•‡†‘—–‘ˆƒއ‡–‡Ǥ”Ǥ‘Ž•‘™‹ŽŽƒƒ‰‡ ƒ†„‡ƒ
–‹˜‡Ž›‹˜‘Ž˜‡†™‹–Š –Ї’”‘Œ‡
– ˆ‘” 

‡‘–‡
А‹
ƒŽǤ
‡™‹ŽŽ„‡ ”‡•’‘•‹„އ ˆ‘”ƒŽŽ
‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ–Ї’”‘Œ‡
–‹
Ž—†‹‰„—–‘–Ž‹‹–‡†–‘ǣ
‘—‹
ƒ–‹‘™‹–Š–Ї‹–›ǯ•
”‡’”‡•‡–ƒ–‹˜‡ǡ „‹ŽŽ‹‰ ˆ—
–‹‘•ǡ ƒ† ’‡”•‘ƒŽŽ› ”‡˜‹‡™‹‰ –Ї •—„‹––‡† ‰‡‘–‡ А‹
ƒŽ
†‘
—‡–•ƒ†’”‡’ƒ”‹‰‘—””‡˜‹‡™”‡’‘”–•Ǥ
‡™‹ŽŽƒŽ•‘„‡ƒ˜ƒ‹Žƒ„އ–‘ƒ•™‡”ƒ›“—‡•–‹‘•
–Šƒ– –Ї‹–›ƒ›Šƒ˜‡Ǥ”Ǥ‘Ž•‘Šƒ•‡š
‡ŽŽ‡–
‘—‹
ƒ–‹‘•‹ŽŽ•ǡ„‘–Š‘”ƒŽƒ†™”‹––‡ǡ
ƒ† Ї ™‹ŽŽ „‡ ƒ˜ƒ‹Žƒ„އ –‘ ›‘— ƒ† ›‘—” –‡ƒ ˜‹ƒ ‡ŽŽ ’Š‘‡ ȋͻͶͻǦͶͳʹǦͲ͸ͶͺȌ ƒ† ‡ƒ‹Ž
ȋ
‘Ž•‘̷މ
‰‡‘–‡
А‹
ƒŽǤ
‘ȌǤ”Ǥ‘Ž•‘™‹ŽŽ„‡›‘—”’”‹ƒ”›
‘–ƒ
–ǡ’”‘Œ‡
–ƒƒ‰‡”ǡƒ†
—Ž–‹ƒ–‡Ž›™‹ŽŽ„‡”‡•’‘•‹„އˆ‘”ƒŽŽƒ•’‡
–•‘ˆ–Ї‰‡‘–‡
А‹
ƒŽ•‡”˜‹
‡•’”‘˜‹†‡†Ǥ
‡‹• ‘”ƒ–›‡
ǡ ”‹
‹’ƒŽ ‰‹‡‡” ‘ˆ 

‡‘–‡
А‹
ƒŽǡ ‹• ƒ ”‡‰‹•–‡”‡†
‡‘–‡
А‹
ƒŽ
‰‹‡‡”ƒ†‹˜‹Ž‰‹‡‡”‹ –Ї–ƒ–‡‘ˆƒŽ‹ˆ‘”‹ƒǤ”Ǥ‘”ƒ–›‡ Бކ•„‘–Šƒƒ
Їޑ”‘ˆ

‹‡
‡ ‹ ‹˜‹Ž ‰‹‡‡”‹‰ ƒ† ƒ•–‡”ǯ• †‡‰”‡‡ ‹
‡‘‡˜‹”‘‡–ƒŽ ‰‹‡‡”‹‰ ƒ† Šƒ•
‘˜‡”ʹͷ›‡ƒ”•‘ˆ‰‡‘–‡
А‹
ƒŽ
‘•—Ž–‹‰‡š’‡”‹‡
‡ǡ‘•–‘ˆ™Š‹
Š„ƒ•‡†‘—–‘ˆƒއ‡–‡Ǥ
”Ǥ‘”ƒ–›‡
™‹ŽŽƒ••‹•–™‹–Š–Ї”‡˜‹‡™‘ˆ–Ї‡‰‹‡‡”‹‰ƒ•’‡
–•‘ˆ–Ї’”‘Œ‡
–ƒ†™‹ŽŽ„‡
ƒ
–‹˜‡Ž›‹˜‘Ž˜‡†™‹–Š–Ї’”‘Œ‡
–ˆ‘”

‡‘–‡
А‹
ƒŽǤ
 ‘”‰ƒ‹œƒ–‹‘ƒŽ
Šƒ”– ƒ† ”±•—±• ˆ‘” ‘—” ‡› ’‡”•‘‡Žǡ‹
Ž—†‹‰ ƒ •—ƒ”› ‘ˆ ”‡Žƒ–‹˜‡
‡š’‡”‹‡
‡ǡƒ”‡‹
Ž—†‡†‘–Їˆ‘ŽŽ‘™‹‰’ƒ‰‡•Ǥ
537
Page
6 January 2025
538

Page 7 ends

Resumes for Key
Technical Team Members
539

Page 8 ends

KEVIN B. COLSON, CEG, PG

EDUCATION
x ǤǤǡ
‡‘Ž‘‰‹
ƒŽ
‹‡
‡•ǡƒ‹‡‰‘–ƒ–‡‹˜‡”•‹–›ǡƒ‹‡‰‘ǡƒŽ‹ˆ‘”‹ƒǡͳͻͻ͸ x ǤǤǡ
‡‘Ž‘‰‹
ƒŽ
‹‡
‡•ǡƒ ”ƒ
‹•
‘–ƒ–‡‹˜‡”•‹–›ǡƒ ”ƒ
‹•
‘ǡƒŽ‹ˆ‘”‹ƒǡͳͻͻ͵

PROFESSIONAL REGISTRATIONS/CERTIFICATIONS
x ƒŽ‹ˆ‘”‹ƒǡ‡”–‹ˆ‹‡†‰‹‡‡”‹‰
‡‘Ž‘‰‹•–ǡ
ʹʹͳͲ
x ƒŽ‹ˆ‘”‹ƒǡ”‘ˆ‡••‹‘ƒŽ
‡‘Ž‘‰‹•–ǡ
͹ͳͳͻ

PROFESSIONAL SUMMARY
• ƒ ‹
‡ ”‡•‹†‡– ‘ˆ ƒ† ‹”‡
–‘” ‘ˆ
‡‘Ž‘‰› ˆ‘” 

‡‘–‡
А‹
ƒŽǡ ”Ǥ ‘Ž•‘ Šƒ• ‘˜‡” ʹͷ ›‡ƒ”• ‘ˆ
‡š’‡”‹‡
‡‹–Ї‰‡‘–‡
А‹
ƒŽ‹†—•–”›‹‘—–Ї”ƒŽ‹ˆ‘”‹ƒǤ
‡Šƒ•„‡‡‹˜‘Ž˜‡†‹—‡”‘—•’”‘Œ‡
–•‹
‘—–Ї”ƒŽ‹ˆ‘”‹ƒ‹
Ž—†‹‰ǣ”‡•‹†‡–‹ƒŽǡ
‘‡”
‹ƒŽǡ”‡–ƒ‹Žǡ–”ƒ•’‘”–ƒ–‹‘ǡƒ†’—„Ž‹
™‘”•Ǥ
”Ǥ ‘Ž•‘ǯ•‡š’‡”–‹•‡‹
Ž—†‡•ǣ ˆƒ—Ž–‹˜‡•–‹‰ƒ–‹‘•ǢŽƒ†•Ž‹†‡‹–‹‰ƒ–‹‘•ƒ† •Ž‘’‡ •–ƒ„‹Ž‹œƒ–‹‘• ȋ„› „‘–Š ‡
Šƒ‹
ƒŽ ƒ† ‡ƒ”–Ї •–ƒ„‹Ž‹œƒ–‹‘ ‡–Š‘†•ȌǢ Š‹ŽŽ•‹†‡ ‰”ƒ†‹‰Ǣ ˆŽƒ– Žƒ† ‰”ƒ†‹‰Ǣ Šƒ”† ”‘  ”‹’’ƒ„‹Ž‹–›
•–—†‹‡•ǢŽ‹“—‡ˆƒ
–‹‘•–—†‹‡•Ǣ†‹•–”‡••‡˜ƒŽ—ƒ–‹‘•Ǣƒ†”‡˜‹‡™•Ǥ”Ǥ‘Ž•‘Šƒ•„‡‡–Їއƒ†‘•‡˜‡”ƒŽ‘ˆ‘—” ‘•–
‘’އš’”‘Œ‡
–•‹
Ž—†‹‰ǣ†‡•‹‰ƒ†
‘•–”—
–‹‘‘ˆƒƒŒ‘”Žƒ†•Ž‹†‡•–ƒ„‹Ž‹œƒ–‹‘™‹–Š–‹‡Ǧ„ƒ
•ƒ†
‰”ƒ†‡„‡ƒ•„‡‡ƒ–Š‘

—’‹‡†—Ž–‹Ǧ•–‘”‹‡†”‡•‹†‡–‹ƒŽ•–”—
–—”‡•Ǣ•Ž‘’‡•–ƒ„‹Ž‹œƒ–‹‘•˜‹ƒƒ‹Žƒ†–‹‡Ǧ„ƒ

™ƒŽŽ• „‡Ž‘™ ƒ
–‹˜‡ ”‘ƒ†™ƒ›•Ǣ †‡•‹‰ ‘ˆ ‡ƒ”–Ї •–ƒ„‹Ž‹œƒ–‹‘• ˆ‘” •‡˜‡”ƒŽ Š—†”‡† ˆ‘‘– Š‹‰Š •Ž‘’‡•Ǣ ˆƒ—Ž– –”‡
Š‹˜‡•–‹‰ƒ–‹‘•‘ˆƒ
–‹˜‡ƒ†’‘–‡–‹ƒŽŽ›ƒ
–‹˜‡ˆƒ—Ž–•Ǣƒ†‹–‹‰ƒ–‹‘‘ˆ—•–ƒ„އ”‘
•Ž‘’‡•Ǥ”Ǥ‘Ž•‘ǡ
Š‹•™‹ˆ‡ƒ†–Š”‡‡
Ћކ”‡”‡•‹†‡‹ƒއ‡–‡Ǥ

PROJECT EXPERIENCE
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘” Žƒ†•Ž‹†‡ ‡˜ƒŽ—ƒ–‹‘ ƒ† ‹–‹‰ƒ–‹‘ ˆ‘” –Ї ƒ•ƒ ‘ƒ–‹ ƒ —Ž–—”ƒŽ ‡–‡” ƒ†
Š‹•–‘”‹
Žƒ†ƒ”‹ƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒǤ

ƒ—ƒ”›‘ˆʹͲʹ͵ǡƒŽƒ”‰‡Žƒ†•Ž‹†‡ˆƒ‹Ž—”‡‘

—””‡†‹–Ї
„Ž—ˆˆ „‡–™‡‡ –Ї
—Ž–—”ƒŽ
‡–‡” •–”—
–—”‡ ƒ†ƒ އ‡–‡ƒ”‹‡ƒˆ‡–›
‡ƒ†“—ƒ”–‡” „—‹Ž†‹‰ ƒ†
‘–‘–ЇƒŽ‹ˆ‘”‹ƒ‡‰‹‘ƒŽƒ‹Ž—–Š‘”‹–›–”ƒ‹”ƒ‹ŽŽ‹‡Ž‘ ƒ–‡†ƒ––Ї–‘‡‘ˆ–Ї„Ž—ˆˆǤ”Ǥ‘Ž•‘ƒ†Š‹•
–‡ƒ“—‹
Ž›’‡”ˆ‘”‡†ƒ‰‡‘–‡
А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘ǡ‹
Ž—†‹‰‡š
ƒ˜ƒ–‹‘ǡ•ƒ’Ž‹‰ƒ††‘™Š‘އŽ‘‰‰‹‰
‘ˆ—Ž–‹’އŽƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•ƒ†‡š
ƒ˜ƒ–‹‘ƒ†•—”ˆƒ
‡Ž‘‰‰‹‰‘ˆ
‘–‹—‘—•
‘”‡ƒ†•‘Ž‹†ǦˆŽ‹‰Š–
„‘”‹‰• –‘ ‘†‡Ž –ЇŽƒ†•Ž‹†‡ ƒ† †‡–‡”‹‡ ƒ ƒ’’”‘’”‹ƒ–‡ ‹–‹‰ƒ–‹‘Ǥ 
Ž‹‘‡–‡”• ™‡”‡‹•–ƒŽŽ‡†
ƒ†ƒ’”‘‰”ƒ‘ˆ†‹•–”‡••‘‹–‘”‹‰™ƒ•‡•–ƒ„Ž‹•Ї†Ǥ”Ǥ‘Ž•‘ƒ†Š‹•–‡ƒ‰‡‡”ƒ–‡†ƒ‘†‡Ž‘ˆ–Ї Žƒ†•Ž‹†‡ ƒ† †‡–‡”‹ƒ–‹‘ ‘ˆ ƒ’’”‘’”‹ƒ–‡ ‹–‹‰ƒ–‹‘ǡ ™Š‹Ž‡ ’”‘–‡ –‹‰ ƒ† ’”‡•‡”˜‹‰ –Ї ‡š‹•–‹‰
•–”—
–—”‡•ƒ†‹’”‘˜‡‡–•ǤЇ‹Ǧ’”‘‰”‡•••–ƒ„‹Ž‹œƒ–‹‘‹ Ž—†‡•
‘•–”—
–‹‘‘ˆƒ‰‡‘‰”‹†Ǧ”‡‹ˆ‘”
‡†
‡ƒ”–Ї„—––”‡••ƒ†ˆ‘—”’‡”ƒ‡–”‘™•‘ˆ‰”ƒ†‡„‡ƒ•ƒ†‹•–ƒŽŽƒ–‹‘‘ˆͻͺǡƒ’’”‘š‹ƒ–‡Ž›ͳͲͲǦˆ‘‘–Ǧ Ž‘‰–‹‡„ƒ
ƒ
Š‘”•ǡƒ†ƒ†‡™ƒ–‡”‹‰•›•–‡ǤŠ‹•’”‘Œ‡
–”‡“—‹”‡†‡š–‡•‹˜‡
‘•–”—
–‹‘‘‹–‘”‹‰
ƒ†–‡•–‹‰ǡƒ•™‡ŽŽƒ•ˆ‹‡Ž†‘†‹ˆ‹
ƒ–‹‘†—”‹‰
‘•–”—
–‹‘Ǥ”Ǥ‘Ž•‘‘˜‡”•ƒ™ƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–•
‘ˆ –Š‹• ’”‘Œ‡
–ƒ•™‡ŽŽƒ•
‘‘”†‹ƒ–‹‘ ‘ˆ –Ї †‡•‹‰ –‡ƒƒ†
‘•–”—
–‹‘ ‘’‡”ƒ–‹‘•Ǥ”Ǥ ‘Ž•‘™ƒ•
540

Page 9 ends

‡••‡–‹ƒŽ ‹
‘‘”†‹ƒ–‹‘ ™‹–Š –Ї ”ƒ‹Ž”‘ƒ†ǡ ƒŽ‹ˆ‘”‹ƒ ‘ƒ•–ƒŽ ‘‹••‹‘ǡ ‹–› ‘ˆ ƒ އ‡–‡ ƒ† —Ž–‹’އ‘–Ї”‘”‰ƒ‹œƒ–‹‘•™‹–Šƒ‹–‡”‡•–‹–Ї’”‘Œ‡ –Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘” ƒ ‡š–‡•‹˜‡ ‰‡‘Ž‘‰‹
 ‡˜ƒŽ—ƒ–‹‘ ˆ‘” †‡˜‡Ž‘’‡– ‘ˆ ƒ ƒ’’”‘š‹ƒ–‡Ž› ͻͷǦƒ ”‡
’‘”–‹‘ ‘ˆ –Ї ƒ
‹‡– ‘”–—‰—‡•‡ ‡† ƒ†•Ž‹†‡ ‘’އ𠋐 ƒ
Š‘ ƒŽ‘• ‡”†‡•ǡ ƒŽ‹ˆ‘”‹ƒǤ 


‡‘–‡
А‹
ƒŽ’‡”ˆ‘”‡†ƒ‰‡‘–‡
А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘ǡ‹
Ž—†‹‰‡š
ƒ˜ƒ–‹‘ǡ•ƒ’Ž‹‰ƒ††‘™ǦБއŽ‘‰‰‹‰
‘ˆ—‡”‘—•Žƒ”‰‡Ǧ†‹ƒ‡–‡”ǡ‡š
ƒ˜ƒ–‹‘ƒ†•ƒ’Ž‹‰‘ˆ—Ž–‹’އ•ƒŽŽǦ†‹ƒ‡–‡”„‘”‹‰•ǡƒ†‡š–‡•‹˜‡ ‰‡‘Ž‘‰‹
 ƒ’’‹‰Ǥ 

‡‘–‡
А‹
ƒŽ •—

‡••ˆ—ŽŽ› †‡‘•–”ƒ–‡†ǡ –Šƒ– –Ї Žƒ†•Ž‹†‡
‘’އš ™‹–Š‹ –Ї
’”‘’‘•‡††‡˜‡Ž‘’‡–ƒ”‡ƒ™ƒ•†‡”‹˜‡†ˆ”‘–Ї‘”–—‰—‡•‡‡†ƒ†•Ž‹†‡‘’އšǡ„—–†‹†‘–•Šƒ”‡ ƒ
‘‘”—’–—”‡•—”ˆƒ
‡™‹–Š‘”–—‰—‡•‡‡†ƒ†•Ž‹†‡Ǥ—”‰‡‘–‡
А‹
ƒŽ”‡’‘”–†‡‘•–”ƒ–‡†–Šƒ–
–Ї ‘•‹–‡ ’‘”–‹‘ ‘ˆ –ЇŽƒ†•Ž‹†‡
‘’އš
‘—ކ „‡ •—

‡••ˆ—ŽŽ›‹–‹‰ƒ–‡†™‹–Š ”‡‡†‹ƒŽ ‰”ƒ†‹‰ ƒ†

‘•–”—
–‹‘‘ˆƒŽƒ”‰‡‡ƒ”–Ї„—––”‡••–‘ƒŽŽ‘™ˆ‘””‡•‹†‡–‹ƒŽ†‡˜‡Ž‘’‡–‘ˆ–Ї•‹–‡Ǥ”Ǥ‘Ž•‘™ƒ•‹

Šƒ”‰‡‘ˆƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ–Š‹•’”‘Œ‡
–ƒ•™‡ŽŽƒ•
‘‘”†‹ƒ–‹‘‘ˆ–Ї†‡•‹‰–‡ƒǤ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ƒ† ‡š’‡”– ™‹–‡•• ˆ‘” –Ї ‰‡‘Ž‘‰‹
 ‡˜ƒŽ—ƒ–‹‘ ƒ†Ž‹–‹‰ƒ–‹‘ ”‡‰ƒ”†‹‰ ƒ ”‡ƒ
–‹˜ƒ–‡†ǡ
ƒ
‹‡–Žƒ†•Ž‹†‡–”‹‰‰‡”‡†„›–Ї™‹†‡‹‰‘ˆƒƒ†Œƒ
‡–”‘ƒ†™ƒ›Ǥ”Ǥ‘Ž•‘ƒ†–Ї

‡‘–‡
А‹
ƒŽ
–‡ƒ’‡”ˆ‘”‡†ƒ‰‡‘–‡
А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘‹
Ž—†‹‰‰‡‘Ž‘‰‹
ƒ’’‹‰‘ˆ–Ї•‹–‡ǡ‡š
ƒ˜ƒ–‹‘‘ˆ•ƒŽŽƒ†
Žƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•Ǥ‘™ǦБއŽ‘‰‰‹‰‘ˆ–ЇŽƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•Ǥ •–ƒŽŽƒ–‹‘ƒ†‘‹–‘”‹‰‘ˆ
•Ž‘’‡ ‹
Ž‹‘‡–‡”•Ǥ
‡‡”ƒ–‹‰ ƒ ‘†‡Ž ‘ˆ –Ї Žƒ†•Ž‹†‡ ƒ† †‡–‡”‹ƒ–‹‘ ‘ˆ –Ї ƒ—•‡ ‘ˆ –Ї
”‡ƒ
–‹˜ƒ–‹‘ƒ†ƒ’’”‘’”‹ƒ–‡‹–‹‰ƒ–‹‘
‘
‡’–Ǥ

‡‘–‡
А‹
ƒŽ’‡”ˆ‘”‡†ƒ‡š–‡•‹˜‡ˆ‘”‡•‹
•–—†›
‘ˆƒ˜ƒ‹Žƒ„އ†ƒ–ƒƒ†•—

‡••ˆ—ŽŽ›†‡–‡”‹‡†–Šƒ––Ї”‘ƒ†™‹†‡‹‰’‡”ˆ‘”‡†–”‹‰‰‡”‡†–ЇŽƒ†•Ž‹†‡ ”‡ƒ
–‹˜ƒ–‹‘Ǥ ”Ǥ ‘Ž•‘ ™ƒ• ‹•–”—‡–ƒŽ ‹ ‡–Š‘†‹
ƒŽŽ› ƒ‹‰ –Š‹• ƒ”‰—‡– ƒ• ƒ ‡š’‡”– ™‹–‡••
†—”‹‰–Ї–”‹ƒŽ™Š‹Ž‡•‹—Ž–ƒ‡‘—•Ž›•Š‘™‹‰–Ї†‡ˆ‡†ƒ–•‡š’‡”–™‹–‡•• Žƒ‹•–‘„‡†‡‘•–”ƒ„Ž›
ˆƒŽ•‡Ǥ”Ǥ‘Ž•‘™ƒ•‹
Šƒ”‰‡‘ˆƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–• ‘ˆ–Š‹•’”‘Œ‡
–ƒ•™‡ŽŽƒ•
‘‘”†‹ƒ–‹‘ ‘ˆ –Ї
†‡•‹‰–‡ƒǤ
x ”‘Œ‡
–
‡‘Ž‘‰‹•–ƒ†‡š’‡”–™‹–‡••ˆ‘”–Ї‰‡‘Ž‘‰‹
‡˜ƒŽ—ƒ–‹‘ƒ†‹–‹‰ƒ–‹‘‘ˆƒ”‡ƒ
–‹˜ƒ–‡†ǡƒ
‹‡–
ˆƒ—Ž–Ǧ
‘–”‘ŽŽ‡† Žƒ†•Ž‹†‡ „‡Ž‘™ ƒ —†‡”Ǧ
‘•–”—
–‹‘ ‡˜‡”Ž›
‹ŽŽ ƒ•‹‘Ǥ Ї ’”‹‘” ‰‡‘–‡
А‹
ƒŽ

‘•—Ž–ƒ–ˆ‘”–Ї’”‘Œ‡
–ˆƒ‹Ž‡†–‘”‡
‘‰‹œ‡ƒƒ
‹‡–Žƒ†•Ž‹†‡„‡‡ƒ–Š–Ї•‹–‡ƒ††‡˜‡Ž‘’‡–ƒ”‡ƒǤ

‡‰”ƒ†‹‰ƒ††‡˜‡Ž‘’‡–™ƒ•‡ƒ”
‘’އ–‡ǡƒ’‘”–‹‘‘ˆ–Їƒ
‹‡–Žƒ†•Ž‹†‡”‡ƒ
–‹˜ƒ–‡†ǡ
ƒ—•‹‰
†‹•–”‡•• –‘ –Ї ‡ƒ”
‘’އ–‡ Š‘‡ ƒ† ‹’”‘˜‡‡–•Ǥ 

‡‘–‡
А‹
ƒŽ –‘‘ ‘˜‡” –Ї ’”‘Œ‡
– ƒ†
’‡”ˆ‘”‡†ƒ‰‡‘–‡
А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘‹
Ž—†‹‰‰‡‘Ž‘‰‹
ƒ’’‹‰‘ˆ–Ї•‹–‡ǡ‡š
ƒ˜ƒ–‹‘‘ˆ•ƒŽŽƒ†Žƒ”‰‡Ǧ
†‹ƒ‡–‡”„‘”‹‰•Ǥ‘™ǦБއŽ‘‰‰‹‰‘ˆ–ЇŽƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•Ǥ •–ƒŽŽƒ–‹‘ƒ†‘‹–‘”‹‰‘ˆ•Ž‘’‡
‹
Ž‹‘‡–‡”•Ǥ
‡‡”ƒ–‹‰ ƒ‘†‡Ž ‘ˆ –ЇŽƒ†•Ž‹†‡ ƒ† †‡–‡”‹ƒ–‹‘ ‘ˆ ƒ’’”‘’”‹ƒ–‡‹–‹‰ƒ–‹‘ǡ ™Š‹Ž‡ ’”‘–‡
–‹‰ ƒ† ’”‡•‡”˜‹‰ –Ї Š‘‡ ƒ† ‹’”‘˜‡‡–•Ǥ Ї •–ƒ„‹Ž‹œƒ–‹‘ ‹ Ž—†‡†
‘•–”—
–‹‘ ‘ˆ ƒ
‡ƒ”–Ї„—––”‡••ƒ†–Š”‡‡’‡”ƒ‡–ƒ†‘‡–‡’‘”ƒ”›”‘™•‘ˆ‰”ƒ†‡„‡ƒ•ƒ†‹•–ƒŽŽƒ–‹‘‘ˆʹͳ͸ǡ ƒ’’”‘š‹ƒ–‡Ž› ͳʹͲǦˆ‘‘–ǦŽ‘‰ –‹‡„ƒ
 ƒ
Š‘”• ƒ† ƒ †‡™ƒ–‡”‹‰ •›•–‡Ǥ ‘‹Ž ƒ‹Ž ™ƒŽŽ• ™‡”‡ ƒŽ•‘

‘•–”—
–‡† –‘’”‘–‡
–‡š‹•–‹‰‹’”‘˜‡‡–•ƒ† ˆƒ
‹Ž‹–ƒ–‡ƒ

‡•• ˆ‘” –Ї‹–‹‰ƒ–‹‘
‘•–”—
–‹‘ǤŠ‹•
’”‘Œ‡
– ”‡“—‹”‡† ‡š–‡•‹˜‡
‘•–”—
–‹‘ ‘‹–‘”‹‰ ƒ† –‡•–‹‰ǡ ƒ• ™‡ŽŽ ƒ• ˆ‹‡Ž† ‘†‹ˆ‹ ƒ–‹‘ †—”‹‰

‘•–”—
–‹‘Ǥ”Ǥ‘Ž•‘™ƒ•‹
Šƒ”‰‡‘ˆƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ–Š‹•’”‘Œ‡
–ƒ•™‡ŽŽƒ•
‘‘”†‹ƒ–‹‘‘ˆ
–Ї†‡•‹‰–‡ƒƒ†
‘•–”—
–‹‘‘’‡”ƒ–‹‘•Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•–ƒ†‡š’‡”–™‹–‡••ˆ‘”–Ї‰‡‘Ž‘‰‹
‡˜ƒŽ—ƒ–‹‘ƒ†‹–‹‰ƒ–‹‘‘ˆƒ”‡ƒ
–‹˜ƒ–‡†ǡƒ
‹‡–
Žƒ†•Ž‹†‡„‡Ž‘™ƒƒ•‹‘‹ƒ‰—ƒ‹‰—‡ŽǤЇ’”‹‘”‰‡‘–‡ А‹
ƒŽ
‘•—Ž–ƒ– ˆ‘” –Ї’”‘Œ‡
– ˆƒ‹Ž‡† –‘
”‡
‘‰‹œ‡ƒƒ
‹‡–Žƒ†•Ž‹†‡„‡‡ƒ–Š–Ї•‹–‡ƒ††‡˜‡Ž‘’‡–ƒ”‡ƒǤ’‘”–‹‘‘ˆ–Їƒ ‹‡–Žƒ†•Ž‹†‡
”‡ƒ
–‹˜ƒ–‡†ǡ‡
‡••‹–ƒ–‹‰ƒ‡‡”‰‡
›‡˜ƒŽ—ƒ–‹‘ƒ†‡‡”‰‡
›‹–‹‰ƒ–‹‘‘ˆ–Їˆƒ‹Ž‡†’‘”–‹‘‘ˆ–Ї
Žƒ†•Ž‹†‡Ǥ 

‡‘–‡
А‹
ƒŽ –‘‘ ‘˜‡” –Ї ’”‘Œ‡
– ƒ† ’‡”ˆ‘”‡† ƒ ‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ ‹
Ž—†‹‰
‰‡‘Ž‘‰‹
ƒ’’‹‰ ‘ˆ –Ї•‹–‡ǡ‡š
ƒ˜ƒ–‹‘ ‘ˆ•ƒŽŽƒ†Žƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•Ǥ‘™ǦБއŽ‘‰‰‹‰ ‘ˆ –Ї Žƒ”‰‡Ǧ†‹ƒ‡–‡” „‘”‹‰Ǥ
•–ƒŽŽƒ–‹‘ ƒ† ‘‹–‘”‹‰ ‘ˆ •Ž‘’‡ ‹
Ž‹‘‡–‡”•Ǥ
‡‡”ƒ–‹‰ ƒ ‘†‡Ž ‘ˆ –Ї
Žƒ†•Ž‹†‡ ƒ† †‡–‡”‹ƒ–‹‘ ‘ˆ ƒ’’”‘’”‹ƒ–‡ ‹–‹‰ƒ–‹‘ǡ ™Š‹Ž‡ ’”‘–‡ –‹‰ ƒ† ’”‡•‡”˜‹‰ –Ї Š‘‡ ƒ†
‹’”‘˜‡‡–•Ǥ Ї •–ƒ„‹Ž‹œƒ–‹‘ ‹
Ž—†‡† ”‡‘˜ƒŽ ‘ˆ –Ї ˆƒ‹Ž‡† ’‘”–‹‘ ‘ˆ –Ї Žƒ†•Ž‹†‡ ‹ †‡‡’ǡ ‘˜‡”Žƒ’’‹‰•Ž‘–Ǧ
—–‡š
ƒ˜ƒ–‹‘•ƒ†•Ž‘’‡”‡
‘•–”—
–‹‘–‘ƒ’’”‘š‹ƒ–‡’”‡Ǧˆƒ‹Ž—”‡‰”ƒ†‡•ǤŠ‹•’”‘Œ‡
–
”‡“—‹”‡†‡š–‡•‹˜‡
‘•–”—
–‹‘‘‹–‘”‹‰ƒ†–‡•–‹‰ǡƒ•™‡ŽŽƒ•ˆ‹‡Ž†‘†‹ˆ‹
ƒ–‹‘†—”‹‰
‘•–”—
–‹‘Ǥ
541

Page 10 ends

”Ǥ‘Ž•‘™ƒ•‹
Šƒ”‰‡‘ˆƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ–Š‹•’”‘Œ‡
–ƒ•™‡ŽŽƒ•
‘‘”†‹ƒ–‹‘‘ˆ–Ї†‡•‹‰
–‡ƒƒ†
‘•–”—
–‹‘‘’‡”ƒ–‹‘•Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•–ˆ‘”–Ї‰‡‘Ž‘‰‹
‡˜ƒŽ—ƒ–‹‘ƒ†‹–‹‰ƒ–‹‘‘ˆƒ”‡ƒ
–‹˜ƒ–‡†ǡƒ
‹‡–Žƒ†•Ž‹†‡„‡‡ƒ–Šƒ
’‘”–‹‘ ‘ˆ ƒ ƒœ ‘ƒ† ‹ ƒ‰—ƒ ‹‰—‡Žǡ ƒŽ‹ˆ‘”‹ƒǤ Ї Žƒ†•Ž‹†‡ ”‡ƒ –‹˜ƒ–‡† •Š‘”–Ž› ƒˆ–‡” ”‘ƒ†™ƒ›

‘•–”—
–‹‘ ƒ† Šƒ• „‡‡ ’‡”‹‘†‹
ƒŽŽ› ‘˜‹‰ ‡˜‡” •‹
‡Ǥ ”‡˜‹‘—•
‘•—Ž–ƒ–• Šƒ† ’‡”ˆ‘”‡†
‡˜ƒŽ—ƒ–‹‘ ƒ† ƒ––‡’–‡† ‹–‹‰ƒ–‹‘• ‹ –Ї ’ƒ•– „—– ™‡”‡ ‹‡ˆˆ‡ –‹˜‡Ǥ 

‡‘–‡
А‹
ƒŽ ™ƒ• Š‹”‡† –‘
‡˜ƒŽ—ƒ–‡ –ЇŽƒ†•Ž‹†‡ƒ††‡–‡”‹‡ –Їƒ’’”‘’”‹ƒ–‡‡–Š‘†‘ˆ‹–‹‰ƒ–‹‘ –‘ƒŽŽ‘™ ˆ‘” ‘•–”—
–‹‘‘ˆ
–™‘’”‘’‘•‡†•‡™‡”ˆ‘”
‡ƒ‹’‹’‡•‹–ЇŽ‘™‡”’‘”–‹‘‘ˆ–ЇŽƒ†•Ž‹†‡Ǥ—”‰‡‘–‡ А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘
‹
Ž—†‡†‰‡‘Ž‘‰‹
ƒ’’‹‰ ‘ˆ –Ї•‹–‡ǡ‡š
ƒ˜ƒ–‹‘ ‘ˆ•ƒŽŽƒ†Žƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•ǡ
‘–‹—‘—•
‘”‡
„‘”‹‰•ǡƒ†‹•–ƒŽŽƒ–‹‘ƒ†‘‹–‘”‹‰‘ˆ•Ž‘’‡‹
Ž‹‘‡–‡”•ǤЇ•–ƒ„‹Ž‹œƒ–‹‘‹
Ž—†‡†
‘•–”—
–‹‘
–™‘ ’‡”ƒ‡– ”‘™• ‘ˆ ‰”ƒ†‡ „‡ƒ• ƒ† ‹•–ƒŽŽƒ–‹‘ ‘ˆ ͳͶͺǡ ƒ’’”‘š‹ƒ–‡Ž› ͳʹͲǦˆ‘‘–ǦŽ‘‰ –‹‡„ƒ 
ƒ
Š‘”•ƒ†ƒ†‡™ƒ–‡”‹‰•›•–‡ǤŠ‹•’”‘Œ‡
–”‡“—‹”‡†‡š–‡•‹˜‡
‘•–”—
–‹‘‘‹–‘”‹‰ƒ†–‡•–‹‰ǡƒ•
™‡ŽŽƒ•ˆ‹‡Ž†‘†‹ˆ‹
ƒ–‹‘†—”‹‰
‘•–”—
–‹‘Ǥ”Ǥ‘Ž•‘™ƒ•‹
Šƒ”‰‡‘ˆƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ–Š‹•
’”‘Œ‡
–ƒ•™‡ŽŽƒ•
‘‘”†‹ƒ–‹‘‘ˆ–Ї†‡•‹‰–‡ƒƒ†
‘•–”—
–‹‘‘’‡”ƒ–‹‘•Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘” ƒ •‡˜‡Ǧ—‹– †‡˜‡Ž‘’‡– ‘ˆ ƒ ”‡
‡– Žƒ†•Ž‹†‡ ‘ˆ ƒ
‘ƒ•–ƒŽ „Ž—ˆˆ ‹ ‘—–Ї”
ƒŽ‹ˆ‘”‹ƒǤ Ї ‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ ‹
Ž—†‡† ‰‡‘Ž‘‰‹
 ƒ’’‹‰ ‘ˆ –Ї •‹–‡ǡ ‡š
ƒ˜ƒ–‹‘ ‘ˆ •ƒŽŽ ƒ†
Žƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•Ǥ‘™ǦБއŽ‘‰‰‹‰‘ˆ–ЇŽƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‹‰•Ǥ •–ƒŽŽƒ–‹‘ƒ†‘‹–‘”‹‰‘ˆ
•Ž‘’‡ ‹
Ž‹‘‡–‡”• ƒ† ˜‹„”ƒ–‹‰ ™‹”‡ ’‹‡œ‘‡–‡”•Ǥ
‡‡”ƒ–‹‰ ƒ ‘†‡Ž ‘ˆ –Ї Žƒ†•Ž‹†‡ ƒ†
†‡–‡”‹ƒ–‹‘ ‘ˆ ƒ’’”‘’”‹ƒ–‡ ‹–‹‰ƒ–‹‘ǡ ™Š‹Ž‡
‘’Ž›‹‰ ™‹–Š ”‡“—‹”‡‡–• ‘ˆ –Ї ƒŽ‹ˆ‘”‹ƒ ‘ƒ•–ƒŽ ‘‹••‹‘ ȋȌǤ ‘’Ž›‹‰ ™‹–Š –Ї ”‡“—‹”‡‡–• ‘ˆ –Ї  ‹ Ž—†‡† „Ž—ˆˆ ‡”‘•‹‘ ƒƒŽ›•‹•ǡ ƒ†
‡˜ƒŽ—ƒ–‹‘‘ˆ™ƒ˜‡”—Ǧ—’‹
‘•‹†‡”ƒ–‹‘‘ˆˆ—–—”‡•‡ƒǦއ˜‡Ž”‹•‡ƒ†‹–•‹’ƒ
–‘–Їˆ—–—”‡•–ƒ„‹Ž‹–›‘ˆ
–Ї„Ž—ˆˆƒ†–Ї•–ƒ„‹Ž‹œ‡†Žƒ†•Ž‹†‡Ǥ
x ”‘Œ‡
–‰‡‘Ž‘‰‹•–ˆ‘”Žƒ†•Ž‹†‡•–ƒ„‹Ž‹œƒ–‹‘ƒ–Ї ‘—–ƒ‹•ƒ–‡ƒŽ—ˆˆ•‡–‹”‡‡–‘—‹–›‹ƒƒ ‘‹–ǡƒŽ‹ˆ‘”‹ƒǤ‰‡‘Ž‘‰‹
‡˜ƒŽ—ƒ–‹‘™ƒ•’‡”ˆ‘”‡†ǡ‹
Ž—†‹‰‰‡‘Ž‘‰‹
ƒ’’‹‰ƒ†‡š
ƒ˜ƒ–‹‘ƒ†
†‘™Š‘އ Ž‘‰‰‹‰ ‘ˆ Žƒ”‰‡ †‹ƒ‡–‡” „‘”‹‰• –‘ ‡˜ƒŽ—ƒ–‡ǡ Šƒ”ƒ
–‡”‹œ‡ ƒ† ‘†‡Ž –Ї Žƒ†•Ž‹†‡Ǥ Ї
•–ƒ„‹Ž‹œƒ–‹‘‹
Ž—†‡†
‘•–”—
–‹‘ ‘ˆ ˆ‘—” ”‘™• ‘ˆ‰”ƒ†‡ „‡ƒ•ƒ†‹•–ƒŽŽƒ–‹‘ ‘ˆ ʹͶͺǡƒ’’”‘š‹ƒ–‡Ž› ʹͲͲǦˆ‘‘–ǦŽ‘‰ –‹‡„ƒ
 ƒ
Š‘”• ƒ† ƒ †‡™ƒ–‡”‹‰ •›•–‡Ǥ Ї ’”‘Œ‡
– ™ƒ• ˆ—”–Ї”
‘’Ž‹
ƒ–‡† „› –Ї
’”‡•‡
‡‘ˆƒ‡š‹•–‹‰ƒ†‘

—’‹‡†”‡–‹”‡‡–
‘—‹–›†‹”‡
–Ž›ƒ„‘˜‡ –ЇŽƒ†•Ž‹†‡ƒ†’”‘’‘•‡†
•–ƒ„‹Ž‹œƒ–‹‘•›•–‡ǤŠ‹•’”‘Œ‡
–”‡“—‹”‡†‡š–‡•‹˜‡
‘•–”—
–‹‘‘‹–‘”‹‰ƒ†–‡•–‹‰ǡƒ•™‡ŽŽƒ•ˆ‹‡Ž†
‘†‹ˆ‹
ƒ–‹‘†—”‹‰
‘•–”—
–‹‘Ǥ”Ǥ‘Ž•‘™ƒ•‹
Šƒ”‰‡‘ˆƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ –Š‹•’”‘Œ‡
–ƒ•
™‡ŽŽƒ•
‘‘”†‹ƒ–‹‘‘ˆ–Ї†‡•‹‰–‡ƒƒ†
‘•–”—
–‹‘‘’‡”ƒ–‹‘•Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•–ˆ‘”–Їƒ’’”‘š‹ƒ–‡Ž›ͶͶͲǦƒ
”‡ƒ–‹ƒ‰‘
‹ŽŽ•

†‡˜‡Ž‘’‡–ˆ‘”–Ї
”˜‹‡‘—‹–›
‡˜‡Ž‘’‡– ‘’ƒ› ‹ –Ї ‹–› ‘ˆ ”ƒ‰‡ǡ ƒŽ‹ˆ‘”‹ƒǤ Ї ’”‘Œ‡ – ™‹ŽŽ —Ž–‹ƒ–‡Ž› ‹
Ž—†‡ ‘˜‡” ͳ͹
‹ŽŽ‹‘
—„‹
›ƒ”†•‘ˆ‰”ƒ†‹‰–‘„‡’‡”ˆ‘”‡†‘˜‡”ƒƒ’’”‘š‹ƒ–‡Ž›•’ƒ‘ˆʹ›‡ƒ”•ǤЇ•‹–‡’”‡•‡–• •‡˜‡”ƒŽ
‘’Ž‹
ƒ–‡†‰‡‘–‡
А‹
ƒŽ‹••—‡• –‘
‘•‹†‡”‹
Ž—†‹‰ǣ‹
”‘Ǧ–—‡Ž‹‰ ˆ‘””‡ƒŽ‹‰‡–‘ˆƒͷͶǦ
‹
Š™ƒ–‡”Ž‹‡ „‡‡ƒ–Š –Ї ƒ
–‹˜‡Žƒ‡• ‘ˆ Šƒ’ƒ˜‡—‡Ǣ‹•–ƒŽŽƒ–‹‘ ‘ˆ ‡™ •–‘” †”ƒ‹Ž‹‡• ˜‹ƒ DzŒƒ
ƒ†„‘”‡dz‡–Š‘†•„‡‡ƒ–Š–Їƒ
–‹˜‡Žƒ‡•‘ˆ–ƒ–‡‘—–‡ʹͶͳȀʹ͸ͳǢ‰”ƒ†‹‰™‹–Š–ЇƒŽ–”ƒ•”‹‰Š–Ǧ ‘ˆǦ™ƒ›†‹”‡
–Ž›ƒ†Œƒ
‡– –‘ƒ
–‹˜‡Žƒ‡•‘ˆ–ƒ–‡‘—–‡ʹͶͳȀʹ͸ͳǢ’”‘’‘•‡†‘˜‡”Ǧ•–‡‡’‡‡†•Ž‘’‡•Ǣ†‡‡’ •ƒ–—”ƒ–‡†ƒŽŽ—˜‹—Ǣ —‡”‘—• ˆƒ—Ž–•Ǣ•Ž‘’‡•–ƒ„‹Ž‹–›‹••—‡•ǢŽƒ†•Ž‹†‡•Ǣ†‡•‡ ˜‘Ž ƒ‹
 ”‘
Ǣ ˜‡”› Š‹‰ŠŽ›
‡š’ƒ•‹˜‡•‘‹Ž•Ǣƒ†•ŠƒŽŽ‘™‰”‘—†™ƒ–‡”Ǥ”Ǥ‘Ž•‘ƒ†Š‹• 
‡‘–‡
А‹
ƒŽ–‡ƒŠƒ˜‡•—

‡••ˆ—ŽŽ›
ƒ††”‡••‡† –Ї•‡ ‹••—‡• ‘ ƒ ‡š–”‡‡Ž› –‹‰Š– –‹‡ ˆ”ƒ‡ ƒ† ™‡”‡ ‡••‡–‹ƒŽ ‹ ‰‡––‹‰ –Ї ’”‘Œ‡ –
ƒ’’”‘˜‡† ˆ‘” †‡˜‡Ž‘’‡– –Š”‘—‰Š
‹–›ǡ
‘—–› ƒ† •–ƒ–‡ Œ—”‹•†‹
–‹‘•Ǥ ƒ”–‹
—Žƒ” 

‡‘–‡
А‹
ƒŽ

‘–”‹„—–‹‘• –‘ –Ї •—

‡•• ‘ˆ –Ї ’”‘Œ‡
–ǡ ‹
Ž—†‡†ǣ †‡•‹‰ ‘ˆ ƒ ‡š–‡•‹˜‡ ™‹
 †”ƒ‹ ‰”‘—†
‹’”‘˜‡‡–•›•–‡ˆ‘”ƒ”‡ƒ•‘ˆ†‡‡’•ƒ–—”ƒ–‡†ƒŽŽ—˜‹—Ǣ†‡•‹‰ˆ‘”‰‡‘‰”‹†”‡‹ˆ‘” ‡‡–ˆ‘”͸ͲǦˆ‘‘–Ǧ
Š‹‰ŠͳǤͷǣͳˆ‹ŽŽ•Ž‘’‡ˆ‘”„”‹†‰‡ƒ„—–‡–Ǣƒ††‡•‹‰‘ˆŽƒ†•Ž‹†‡”‡‡†‹ƒ–‹‘ƒ†•Ž‘’‡•–ƒ„‹Ž‹œƒ–‹‘•ˆ‘” –Ї’”‘Œ‡
–•Ž‘’‡•Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘” ƒ ‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ ˆ‘” ƒ ’”‘’‘•‡† ͺͶǦƒ
”‡ ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ‹ –Ї

‘”„ƒ ‹†ƒƒ”‡ƒ ‘ˆ —‹
‘”’‘”ƒ–‡†”ƒ‰‡ ‘—–›Ǥ• ’ƒ”– ‘ˆƒ‰‡‘–‡
А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘ ‘ˆ –Ї ‘˜‡”ƒŽŽ
•‹–‡ǡƒ•—„•—”ˆƒ
‡ˆƒ—Ž––”‡
Ї˜ƒŽ—ƒ–‹‘™ƒ•’‡”ˆ‘”‡†‹–Ї‘•‹–‡’‘”–‹‘‘ˆ–Ї ƒ—Ž–—’–—”‡ ƒœƒ”†

‘‡ˆ‘”–ЇŠ‹––‹‡” ƒ—Ž–Ǥ ‘ŽŽ‘™‹‰ƒ‡”‹ƒŽ’Š‘–‘‰”ƒ’Š‹ ”‡˜‹‡™ǡ–‘’‘‰”ƒ’Š‹
ƒ’”‡˜‹‡™ǡƒ†”‡˜‹‡™‘ˆ
542

Page 11 ends

”‡’‘”–•ƒ†‘’‡ˆƒ—Ž––”‡
Ї•‘–Їƒ†Œƒ
‡–•‹–‡ǡˆ‘—”ˆƒ—Ž––”‡
Ї•™‡”‡‡š
ƒ˜ƒ–‡†™‹–Š‹–Ї ƒ—Ž–
—’–—”‡
ƒœƒ”†
‘‡ƒ††‡–ƒ‹Ž‡†Ž‘‰‰‹‰’‡”ˆ‘”‡†ǤЇ–”‡
Ї•”ƒ‰‡†‹އ‰–Šˆ”‘ƒ’’”‘š‹ƒ–‡Ž›
ͳͲͷ–‘͵ʹͲŽ‹‡ƒ”ˆ‡‡–ǡƒ†‡ƒ
Š™‡”‡ƒ’’”‘š‹ƒ–‡Ž›–‡ˆ‡‡–†‡‡’Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•–ˆ‘”ƒ•—„•—”ˆƒ
‡ˆƒ—Ž––”‡
Ї˜ƒŽ—ƒ–‹‘‘ˆƒ
–‹˜‡•–”ƒ†•‘ˆ–Їƒ
ƒ
‹–‘ˆƒ—Ž–‹ƒ

ƒ
‹–‘ ƒŽ‹ˆ‘”‹ƒǤ Ї •–—†› ‹
Ž—†‡† ”‡•‡ƒ”
Šǡ ”‡’‘”– ”‡˜‹‡™ǡ ƒ‡”‹ƒŽ ’Š‘–‘‰”ƒ’Š‹
 ”‡˜‹‡™ ƒ† ƒ
•—„•—”ˆƒ
‡ ‡˜ƒŽ—ƒ–‹‘ ‹
Ž—†‹‰ ‡š
ƒ˜ƒ–‹‘ ƒ† †‡–ƒ‹Ž‡† Ž‘‰‰‹‰ ‘ˆ –™‘ ʹͲǦˆ‘‘–Ǧ†‡‡’ ˆƒ—Ž– –”‡ Ї•
–‘–ƒŽ‹‰ƒ’’”‘š‹ƒ–‡Ž›ͺͲͲŽ‹‡ƒ” ˆ‡‡–Ǥ—Ž–‹’އ•–”ƒ†•‘ˆ –Ї ˆƒ—Ž–™‡”‡‹†‡–‹ˆ‹‡†„”‡ƒ‹‰ ‘Ž‘
‡‡Ǧ
ƒ‰‡†•‡†‹‡–‹†‹
ƒ–‹‰ƒ
–‹˜‡ˆƒ—Ž–‹‰Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘”‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™ ˆ‘”’‘–‡–‹ƒŽ ˆ‘” ˆƒ—Ž–‹‰™‹–Š‹ –Ї’”‘’‘•‡†ͳͲͲǦƒ ”‡‘„އ
”‡‡”‡•‹†‡–‹ƒŽ†‡˜‡Ž‘’‡–‹‡ƒ—‘–ǡƒŽ‹ˆ‘”‹ƒǤˆƒ—Ž–•–—†›™ƒ•’‡”ˆ‘”‡†™‹–Š‹–Їˆƒ—Ž–œ‘‡ ˆ‘”–Ї‡ƒ—‘–Žƒ‹ˆƒ—Ž–œ‘‡ǡ‹
Ž—†‹‰‡š
ƒ˜ƒ–‹‘ƒ†Ž‘‰‰‹‰‘ˆƒ’’”‘š‹ƒ–‡Ž›ͳǡʹͲͲŽ‹‡”ˆ‡‡–‘ˆ ˆƒ—Ž– –”‡
Ї• ƒ† –™‘ •‡‹•‹
 ”‡ˆ”ƒ
–‹‘ Ž‹‡•Ǥ ƒ—Ž– –”ƒ
‡• ‘ˆ –Ї ‡ƒ—‘– Žƒ‹ ˆƒ—Ž– œ‘‡ ™‡”‡
‹†‡–‹ˆ‹‡†‹—Ž–‹’އˆƒ—Ž––”‡
Ї•ƒ††‡–‡”‹‡†–‘„‡
‘Ž‘
‡‡ƒ
–‹˜‡Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•–ˆ‘”‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™ˆ‘”’‘–‡–‹ƒŽˆ‘”ˆƒ—Ž–‹‰™‹–Š‹ƒ’”‘’‘•‡†ͳͷͲǦƒ ”‡‹†—•–”‹ƒŽ
†‡˜‡Ž‘’‡– ‹ –Ї ‹–› ‘ˆ ‡ƒ—‘–ǡ ƒŽ‹ˆ‘”‹ƒǤ  ˆƒ—Ž– –”ƒ ‡ ‘ˆ –Ї ‡ƒ—‘– Žƒ‹ ˆƒ—Ž– œ‘‡ ƒ†
ƒ••‘
‹ƒ–‡†‘—–›‘ˆ‹˜‡”•‹†‡ˆƒ—Ž–•–—†›œ‘‡™ƒ•ƒ’’‡†ƒ ”‘••–Ї•—„Œ‡
–•‹–‡ǤЇ•–—†›‹
Ž—†‡†
”‡˜‹‡™‘ˆ—Ž–‹’އˆƒ—Ž–‡˜ƒŽ—ƒ–‹‘”‡’‘”–•‘–Ї‡ƒ—‘–Žƒ‹ˆƒ—Ž–ǡ”‡˜‹‡™‘ˆƒ‡”‹ƒŽ’Š‘–‘‰”ƒ’Š•ƒ† –‘’‘‰”ƒ’Š‹
 ƒ’•ǡ ‰‡‘Ž‘‰‹
 ƒ’’‹‰ ‘ˆ –Ї •‹–‡Ǥ Ї •–—†›
‘
Ž—†‡† –Šƒ– ™Š‹Ž‡ •‘‡ •–”ƒ†• ‘ˆ –Ї
‡ƒ—‘–Žƒ‹ˆƒ—Ž–œ‘‡Šƒ˜‡„‡‡†‡–‡”‹‡†–‘„‡
‘Ž‘
‡‡ƒ
–‹˜‡ǡ‘•–ǡ‹
Ž—†‹‰–Ї•–”ƒ†‘–Ї
•—„Œ‡
–•‹–‡†‹†‘–•Š‘™ƒ›‹†‹
ƒ–‹‘‘ˆ
‘Ž‘
‡‡ƒ
–‹˜‹–›Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘” ‰‡‘–‡
А‹
ƒŽ ”‡˜‹‡™ ‘ˆ ˆƒ—Ž– •–—†› ”‡’‘”–• ˆ‘” ƒ ’”‘’‘•‡† ͶͳͲǦƒ ”‡ ”‡•‹†‡–‹ƒŽ
†‡˜‡Ž‘’‡–‹ƒ ‡”ƒ”†‹‘ǡ ƒŽ‹ˆ‘”‹ƒǤЇ ’”‘Œ‡ –‹
Ž—†‡† ‡š
ƒ˜ƒ–‹‘ ƒ† †‡–ƒ‹Ž‡†Ž‘‰‰‹‰ ‘ˆ ͳͺ
ˆƒ—Ž––”‡
Ї•ȋˆ‘”ƒ–‘–ƒŽ‘ˆƒ’’”‘š‹ƒ–‡Ž›ͺǡͷͳͲŽ‹‡ƒ”ˆ‡‡–Ȍ™‹–Š‹–Ї‘•‹–‡’‘”–‹‘‘ˆ–Ї–ƒ–‡ ƒ—Ž–Ǧ —’–—”‡
ƒœƒ”†
‘‡ˆ‘”–Їƒ†”‡ƒ• ƒ—Ž–
‘‡Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘” —‡”‘—• ’”‘Œ‡
–• ˆ‘” –Ї ‹–› ‘ˆ 
‡ƒ•‹†‡ ƒ–‡” –‹Ž‹–‹‡• ‡’ƒ”–‡–Ǥ Ї•‡
‹
Ž—†‡ ‡˜ƒŽ—ƒ–‹‘ ƒ† ‘„•‡”˜ƒ–‹‘ ƒ† –‡•–‹‰ ˆ‘” ‘ƒ Ž–ƒ ‡”‰‡ › ‡™‡” ‡’Žƒ
‡‡– ”‘Œ‡
–ǡ
‘„•‡”˜ƒ–‹‘ƒ†–‡•–‹‰ˆ‘”‹••‹‘ƒ•‹’‡”ƒ–‹‘•—‹Ž†‹‰ǡ‡˜ƒŽ—ƒ–‹‘ˆ‘”–Ї‘”–ŠƒŽŽ‡›‹ˆ––ƒ–‹‘ ‡‡”‰‡
›
Šƒ‡Ž•–ƒ„‹Ž‹œƒ–‹‘ƒ†ˆ‘”
‡†•‡™‡”ƒ‹„›’ƒ••ǡ‡˜ƒŽ—ƒ–‹‘ˆ‘”‡™ƒ‹–‡ƒ
‡—‹Ž†‹‰
ƒ–ƒ—‹•‡›ƒ–‡””‡ƒ–‡– ƒ
‹Ž‹–›ǡ‡™‡‡•‡ƒ–‡” ‹Ž–”ƒ–‹‘Žƒ–‹’”‘˜‡‡–•ǡ‡˜ƒŽ—ƒ–‹‘ ƒ†‘„•‡”˜ƒ–‹‘ƒ†–‡•–‹‰ˆ‘”‘–—•–”‡‡–‡™‡”‡’Žƒ ‡‡–ǡ‡˜ƒŽ—ƒ–‹‘ƒ†‘„•‡”˜ƒ–‹‘ƒ†–‡•–‹‰
ˆ‘”
ƒ›ƒ””‹˜‡‡™‡”‡’Žƒ
‡‡–Ǥ
x ”‘Œ‡
–
‡‘Ž‘‰‹•– ˆ‘” ƒ‰—ƒ ‡ƒ
Š ‡™‡”
–‡”
‡’–‘” —‡Ž ”‡Šƒ„‹Ž‹–ƒ–‹‘ǡ ƒ‰—ƒ ‡ƒ
Šǡ ƒŽ‹ˆ‘”‹ƒǤ
Ї’”‘Œ‡
–‹
Ž—†‡†‰‡‘Ž‘‰‹
ƒ’’‹‰ƒ†‡˜ƒŽ—ƒ–‹‘‘ˆƒ’’”‘š‹ƒ–‡Ž›–™‘‹Ž‡•‘ˆ
‘ƒ•–ƒŽ„Ž—ˆˆƒŽ‘‰
–Ї–—‡ŽƒŽ‹‰‡–Ǥƒ’’‹‰™ƒ•’‡”ˆ‘”‡†„‘–Š™‹–Š‹–Ї—Ž‹‡†’‘”–‹‘•‘ˆ–Ї‡š‹•–‹‰–—‡Žƒ† ƒ†‹–•ƒŽ‘‰–Ї„Ž—ˆˆˆƒ
‡ǤЇ•–—†›‹
Ž—†‡†ƒƒŽ›•‹•‘ˆ–Ї•–ƒ„‹Ž‹–›‘ˆ–Ї„Ž—ˆˆ–‘ƒ••‡••–Ї‰‡‘–‡ А‹
ƒŽ

‘†‹–‹‘• ƒŽ‘‰ –Ї
‘ƒ•–ƒŽ „Ž—ˆˆ‹ ƒ ‡ˆˆ‘”– –‘‹†‡–‹ˆ› ƒ”‡ƒ• ‘ˆ ’‘–‡–‹ƒŽ ‘
‡” ˆ‘” –Ї –—‡Ž ƒ†
ƒ••‘
‹ƒ–‡†ƒ†‹–•ƒ†’‘”–ƒŽ•ƒ†–‘‡˜ƒŽ—ƒ–‡–Ї’‘–‡–‹ƒŽ‹’ƒ –‘ˆ–Ї’”‘’‘•‡†–—‡Ž”‡Šƒ„‹Ž‹–ƒ–‹‘‘
–Ї •–ƒ„‹Ž‹–› ‘ˆ –Ї „Ž—ˆˆǤ ‘ ƒ˜‘‹† ’‘–‡–‹ƒŽ ‹’ƒ – ‘ –Ї —Ž–‹Ǧ‹ŽŽ‹‘Ǧ†‘ŽŽƒ” ”‡•‹†‡
‡• ƒ„‘˜‡ǡ 


‡‘–‡
А‹
ƒŽ ƒ‹†‡† ‹ †‡•‹‰‹‰ –Ї ‡™ ‡‰‹‡‡”‡† •–”—
–—”ƒŽ Ž‹‡” ˆ‘” –Ї –—‡Ž ”‡Šƒ„‹Ž‹–ƒ–‹‘ –‘
”‡’Ž‹
ƒ–‡–Ї•–”‡‰–ŠŽ‘•–†—‡–‘–Ї‹
”‡ƒ•‡††‹ƒ‡–‡”‘ˆ–Ї–—‡ŽǤ

PROFESSIONAL HISTORY

—Ž›ʹͲͳͲǦ”‡•‡–ǣ ”‹
‹’ƒŽ
‡‘Ž‘‰‹•–ǡ

‡‘–‡
А‹
ƒŽǡ

Ǥǡƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒ
ʹͲͲ͸Ǧ
—Ž›ʹͲͳͲǣ ‹
‡”‡•‹†‡–ǡƒ™•‘Ƭ••‘
‹ƒ–‡•
‡‘–‡
А‹
ƒŽ‘•—Ž–‹‰ǡ

Ǥǡƒއ‡–‡ǡ
ƒŽ‹ˆ‘”‹ƒ
543

Page 12 ends

ʹͲͲʹǦʹͲͲ͸ǣ ••‘
‹ƒ–‡
‡‘Ž‘‰‹•–ǡƒ™•‘Ƭ••‘
‹ƒ–‡•
‡‘–‡
А‹
ƒŽ‘•—Ž–‹‰ǡ

Ǥǡƒ
އ‡–‡ǡƒŽ‹ˆ‘”‹ƒ
ʹͲͲͳǦʹͲͲʹǣ ”‘Œ‡
–
‡‘Ž‘‰‹•–ǡƒ™•‘Ƭ••‘
‹ƒ–‡•
‡‘–‡
А‹
ƒŽ‘•—Ž–‹‰ǡ

Ǥǡƒއ‡–‡ǡ
ƒŽ‹ˆ‘”‹ƒ
ͳͻͻͶǦʹͲͲͳǣ ”‘Œ‡
–
‡‘Ž‘‰‹•–ǡ–ƒˆˆ
‡‘Ž‘‰‹•–ǡƒ†‡
А‹
ƒŽ
ŽŽ—•–”ƒ–‘”ǡ‡‹‰Š–‘ƒ†••‘
‹ƒ–‡•ǡ


Ǥǡƒ‹‡‰‘ǡƒŽ‹ˆ‘”‹ƒ

PUBLICATIONS
‘Ž•‘ǡǤǤǡƒ†
”‘˜‡ǡǤǡͳͻͻͶǡ–”ƒ–‹‰”ƒ’Š›ƒ†–”—
–—”‡‘ˆ–Їއ‹•–‘
‡‡އƒ”‡‡ ‘”ƒ–‹‘ǡƒ”‹
‘—–›ǡƒŽ‹ˆ‘”‹ƒǣ
‡‘Ž‘‰‹
ƒŽ‘
‹‡–›‘ˆ‡”‹
ƒ„•–”ƒ
–•™‹–Š”‘‰”ƒ•ǡ‘ŽǤʹ͸ǡ‘Ǥʹǡ’ǤͶͷǤ
‘Ž•‘ǡǤǤǡ‘
™‡ŽŽǡǤǤǡŠ‘”—’ǡǤǤǡƒ†‡‡†›ǡ
ǤǤǡͳͻͻͷǡ‡‘–‡
–‘‹
•‘ˆ–Їއˆ–Ǧƒ–‡”ƒŽƒ–ƒ‘•‡

•Žƒ† ƒ—Ž–ǡ‡•–‡””ƒ•˜‡”•‡ƒ‰‡•ǡ‘—–Ї”ƒŽ‹ˆ‘”‹ƒǣ ‡‘Ž‘‰‹
ƒŽ‘
‹‡–›‘ˆ‡”‹
ƒ„•–”ƒ
–•™‹–Š
”‘‰”ƒ•ǡ‘ŽǤʹ͹ǡ‘Ǥͷǡ’ǤͳͳǤ

”‘˜‡ǡ Ǥǡ ‘Ž•‘ǡ ǤǤǡ ‹‹ǡ Ǥǡ —ŽŽǡ Ǥǡ ƒ† ƒ””‹•‘ǡ Ǥǡ ͳͻͻͷǡ –”ƒ–‹‰”ƒ’Š› ƒ† –”—
–—”‡ ‘ˆ –Ї ƒ–‡
އ‹•–‘
‡‡އƒ”‡‡ ‘”ƒ–‹‘ǡƒ†”‡ƒ• ƒ—Ž–
‘‡‘”–Š–‘ƒ ”ƒ
‹•
‘ǡƒŽ‹ˆ‘”‹ƒǡ‹ƒƒ‰‹‡•ǡ
ǤǤǡ†‡”•‘ǡǤǤǡƒ†—‹•‹‰ǡǤǤǡ‡†•Ǥǡ‡
‡–
‡‘Ž‘‰‹
ƒŽ–—†‹‡•‹–Їƒ ”ƒ
‹•
‘ƒ›”‡ƒǣǤǤǤǤǡ
‘ŽǤ͹͸ǡ’ͷͷǦ͹͸Ǥ
544

Page 13 ends

DENNIS BORATYNEC, GE, PE

EDUCATION
x Ǥ
Ǥ‹
‡‘‡˜‹”‘‡–ƒŽ‰‹‡‡”‹‰ǡ‹˜‡”•‹–›‘ˆŽ„‡”–ƒǡ†‘–‘ǡŽ„‡”–ƒǡƒƒ†ƒǡʹͲͲ͵ x Ǥ
Ǥ‹‹˜‹Ž‰‹‡‡”‹‰ǡ‹˜‡”•‹–›‘ˆŽ„‡”–ƒǡ†‘–‘ǡŽ„‡”–ƒǡƒƒ†ƒǡͳͻͻͷ

PROFESSIONAL REGISTRATIONS/CERTIFICATIONS
x ƒŽ‹ˆ‘”‹ƒǡ‡”–‹ˆ‹‡†
‡‘–‡
А‹
ƒŽ‰‹‡‡”ǡ
ʹ͹͹Ͳ
x ƒŽ‹ˆ‘”‹ƒǡ‡‰‹•–‡”‡†‹˜‹Ž‰‹‡‡”ǡ͸Ͳ͹ͳ͸

PROFESSIONAL SUMMARY
• ”‹
‹’ƒŽ ‰‹‡‡” ˆ‘” 

‡‘–‡
А‹
ƒŽǡ ”Ǥ ‘”ƒ–›‡
‹• ƒ ”‡‰‹•–‡”‡†
‡‘–‡
А‹
ƒŽ ‰‹‡‡” ƒ† ‹˜‹Ž
‰‹‡‡”‹ –Ї–ƒ–‡‘ˆƒŽ‹ˆ‘”‹ƒǤ”Ǥ‘”ƒ–›‡
Бކ•„‘–Šƒƒ
Їޑ”‘ˆ
‹‡
‡‹‹˜‹Ž‰‹‡‡”‹‰ƒ†
ƒ•–‡”ǯ• †‡‰”‡‡ ‹
‡‘‡˜‹”‘‡–ƒŽ ‰‹‡‡”‹‰ ƒ† Šƒ• ‘˜‡” ʹͷ ›‡ƒ”• ‘ˆ ‰‡‘–‡ А‹
ƒŽ
‘•—Ž–‹‰
‡š’‡”‹‡
‡Ǥ
‡ Šƒ• „‡‡ ‹˜‘Ž˜‡† ‹ —‡”‘—• ’”‘Œ‡
–• ‹ ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ‹
Ž—†‹‰ǣ ”‡•‹†‡–‹ƒŽǡ

‘‡”
‹ƒŽǡ”‡–ƒ‹Žǡ–”ƒ•’‘”–ƒ–‹‘ǡƒ†’—„Ž‹
™‘”•Ǥ”Ǥ‘”ƒ–›‡
ǯ•‡š’‡”–‹•‡‹
Ž—†‡•ǣ‡˜ƒŽ—ƒ–‹‘‘ˆ•Ž‘’‡
•–ƒ„‹Ž‹–›ǡ ˆ‘—†ƒ–‹‘
ƒ’ƒ
‹–›ǡ Ž‹“—‡ˆƒ
–‹‘ǡ ‰”‘—† •‡––އ‡– ƒ† ’”‘˜‹†‹‰
‘•–Ǧ‡ˆˆ‡
–‹˜‡ ‰”‘—†
‹’”‘˜‡‡–ƒŽ–‡”ƒ–‹˜‡•Ǥ”Ǥ‘”ƒ–›‡
Šƒ•„‡‡–Їއƒ†‘•‡˜‡”ƒŽ‘ˆ‘—”‘•–
‘’އš’”‘Œ‡
–•‹
Ž—†‹‰
–Ї‹–‹‰ƒ–‹‘‘ˆ•‡˜‡”‡•‘‹ŽŽ‹“—‡ˆƒ
–‹‘’‘–‡–‹ƒŽ–Š”‘—‰Š–Ї—•‡‘ˆ•–‘‡
‘Ž—•ƒ††‡•‹‰‘ˆ™‹
†”ƒ‹
Žƒ›‘—–• –‘ ƒ

‡Ž‡”ƒ–‡ ”‡“—‹”‡† ƒŽŽ—˜‹ƒŽ •‘‹Ž •‡––އ‡– ’”‹‘” –‘ †‡˜‡Ž‘’‡–Ǥ ”Ǥ ‘”ƒ–›‡  Šƒ• ‡š–‡•‹˜‡
‡š’‡”‹‡
‡‹Š‹ŽŽ•‹†‡‰”ƒ†‹‰ǡˆŽƒ–Žƒ†‰”ƒ†‹‰ǡ†‹•–”‡••‡˜ƒŽ—ƒ–‹‘•ǡƒ†”‡˜‹‡™•Ǥ

SELECTED PROJECT EXPERIENCE
x ”‘Œ‡
–ƒƒ‰‡”Ȁ‰‹‡‡”ǡ‡•‡”˜‘‹”͓Ͷǡƒއ‡–‡Ǥ‡”ˆ‘”‡†ƒ•—„•—”ˆƒ ‡‰‡‘–‡
А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘
–‘ƒ••‡••–Ї‘•‹–‡‰‡‘–‡
А‹
ƒŽ
‘†‹–‹‘•ƒ•–Ї›”‡Žƒ–‡–‘”‡’Žƒ
‹‰–Ї‡š‹•–‹‰ƒ‹Ž‹‡™‹–Šƒ‡™
ƒ‹Ž‹‡™Š‹
Š™‹ŽŽ„‡‹•–ƒŽŽ‡†˜‹ƒ†‹”‡
–‹‘ƒŽ†”‹ŽŽ‹‰Ǥ
x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ ”‡ƒ–‡– Žƒ– —‹Ž†‹‰ ̶ǡdz ƒ އ‡–‡Ǥ ‡‘–‡
А‹
ƒŽ ‘„•‡”˜ƒ–‹‘ ƒ†
–‡•–‹‰ˆ‘”•‡™‡”Ž‹‡„ƒ
ˆ‹ŽŽǡ•—„‰”ƒ†‡ƒ†ƒ‰‰”‡‰ƒ–‡„ƒ•‡Ǥ
x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ ˜‡‹†ƒ ‘Ž—„‘ ‡™‡” ‹ˆ– –ƒ–‹‘ ”‘–‡ –‹‘ǡ ƒ އ‡–‡Ǥ ”‘˜‹†‡† ƒ
•—„•—”ˆƒ
‡‡˜ƒŽ—ƒ–‹‘ƒ††‡•‹‰‘ˆ
ƒ‹••‘•–‘•—’’‘”–ƒ‡š‹•–‹‰•‡™‡”Ž‹ˆ–•–ƒ–‹‘‹˜‡‹†ƒ‘Ž—„‘Ǥ x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ —‡Ž
•Žƒ† ‘˜‡”ǡ ”‡ƒ–‡– Žƒ–ǡ ƒ އ‡–‡Ǥ ”‘˜‹†‡† ‰‡‘–‡ А‹
ƒŽ
‘„•‡”˜ƒ–‹‘‘ˆ
ƒ‹••‘†”‹ŽŽ‹‰ǡ
‘
”‡–‡–‡•–‹‰ƒ††‡’—–›‹•’‡
–‘”ˆ‘”‹•
‡ŽŽƒ‡‘—•™‡Ž†‹‰Ǥ
x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ ˜‡‹†ƒ ƒ ƒ„Ž‘ǡ ”‡••—”‡ ‡†— ‹‰ –ƒ–‹‘ǡ ƒ އ‡–‡Ǥ ”‘˜‹†‡† ƒ
•—„•—”ˆƒ
‡‡˜ƒŽ—ƒ–‹‘ƒ††‡•‹‰”‡
‘‡†ƒ–‹‘• ˆ‘”ƒ‡™’”‡••—”‡”‡†—
‹‰•–ƒ–‹‘Ž‘
ƒ–‡†™‹–Š‹
˜‡‹†ƒƒƒ„Ž‘Ǥ
x ”‘Œ‡
–ƒƒ‰‡”Ȁ‰‹‡‡”ǡƒ‹‘‡”ƒ”—œƒ†˜‡‹†ƒ‹•–ƒ ‡”‘•ƒƒ–‡”‹‡‡’Žƒ
‡‡–ǡƒ
އ‡–‡Ǥ”‘˜‹†‡†‘„•‡”˜ƒ–‹‘ƒ†–‡•–‹‰•‡”˜‹
‡•†—”‹‰„ƒ
ˆ‹ŽŽƒ†
‘’ƒ
–‹‘‘ˆƒ‡™™ƒ–‡”Ž‹‡Ǥ
x ”‘Œ‡
–ƒƒ‰‡”Ȁ‰‹‡‡”ǡ‡Žƒ„‘–”‡‡–ƒ–‡”‹‡‡’Žƒ
‡‡–ǡƒއ‡–‡Ǥ”‘˜‹†‡†‘„•‡”˜ƒ–‹‘
ƒ†–‡•–‹‰•‡”˜‹
‡•†—”‹‰„ƒ
ˆ‹ŽŽƒ†
‘’ƒ
–‹‘‘ˆ‡™™ƒ–‡”Ž‹‡Ǥ
545

Page 14 ends

x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ ‹ƒ ‡ŽŽ‘–ƒǡ ƒ އ‡–‡Ǥ
‡‘–‡
А‹
ƒŽ ‘„•‡”˜ƒ–‹‘ ƒ† –‡•–‹‰ •‡”˜‹
‡•
‹
Ž—†‹‰•‡™‡”ƒ†™ƒ–‡”Ž‹‡ǡ•—„‰”ƒ†‡ˆ‘”•–”‡‡–•ǡ
—”„ƒ†‰—––‡”ǡ•‹†‡™ƒŽƒ††”‹˜‡™ƒ›ƒ’’”‘ƒ
Ї•ǡ
ƒ‰‰”‡‰ƒ–‡„ƒ•‡ƒ†ƒ•’ŠƒŽ–
‘’ƒ
–‹‘Ǥ
x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ ƒŽŽ‡ ƒ„އ –‘” ”ƒ‹ ‡’ƒ‹”ǡ ƒ އ‡–‡Ǥ ‡‘–‡
А‹
ƒŽ ‘„•‡”˜ƒ–‹‘
ƒ†–‡•–‹‰•‡”˜‹
‡•†—”‹‰”‡’ƒ‹”‘ˆƒ’’”‘š‹ƒ–‡Ž›ͳͳͷˆ‡‡–‘ˆ•–‘”†”ƒ‹Ž‹‡Ž‘ ƒ–‡†™‹–Š‹ƒ‡š‹•–‹‰
•Ž‘’‡ǡ™Š‹
Š™ƒ•„‡‹‰‡”‘†‡†Ǥ

PROFESSIONAL HISTORY

—Ž›ʹͲͳͲǦ”‡•‡–ǣ ”‹
‹’ƒŽ‰‹‡‡”

‡‘–‡
А‹
ƒŽǡ

Ǥǡƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒ 
ʹͲͲ͸Ǧ
—Ž›ʹͲͳͲǣ  ‹
‡ ”‡•‹†‡–ǡ ƒ™•‘ Ƭ ••‘
‹ƒ–‡•
‡‘–‡
А‹
ƒŽ ‘•—Ž–‹‰ǡ

Ǥǡ ƒ އ‡–‡ǡ
ƒŽ‹ˆ‘”‹ƒ
ʹͲͲͳǦʹͲͲ͸ǣ ••‘
‹ƒ–‡ ‰‹‡‡”ǡ ƒ™•‘ Ƭ ••‘
‹ƒ–‡•
‡‘–‡
А‹
ƒŽ ‘•—Ž–‹‰

Ǥǡ ƒ
އ‡–‡ǡƒŽ‹ˆ‘”‹ƒ
ͳͻͻͺǦʹͲͲͳǣ ”‘Œ‡
– ‰‹‡‡”Ȁƒƒ‰‡”ǡ ‡‹‘” –ƒˆˆ ‰‹‡‡”ǡ –ƒˆˆ ‰‹‡‡”ǡ ‡‹‰Š–‘ ƒ† ••‘
‹ƒ–‡•ǡ

Ǥǡ
”˜‹‡ǡƒŽ‹ˆ‘”‹ƒ
ͳͻͻ͸ǣ
—‹‘”
‡‘–‡
А‹
ƒŽ‰‹‡‡”ǡޑАǦ”‹’’‡‘•—Ž–ƒ–•ǡƒ
‘—˜‡”ǡƒƒ†ƒ
HONORS AND PROFESSIONAL SOCIETIES
‡„‡”‘ˆ‡”‹
ƒ‘
‹‡–›‘ˆ‹˜‹Ž‰‹‡‡”•
‡„‡”‘ˆ••‘
‹ƒ–‹‘‘ˆ‰‹‡‡”‹‰
‡‘Ž‘‰‹•–•
ƒŽ‹ˆ‘”‹ƒ
‡‘–‡
А‹
ƒŽ‰‹‡‡”•••‘
‹ƒ–‹‘

PUBLICATION
Ȉ ‘”ƒ–›‡
ǡǤ
ǤǡʹͲͲ͵ǡDz —†ƒ‡–ƒŽ•‘ˆƒ’‹†‡™ƒ–‡”‹‰‘ˆ‘’‘•‹–‡ƒ‹Ž‹‰•dzǡǤ ǤЇ•‹•Ǥ
546

Page 15 ends

TIMOTHY J. LAWSON, GE, PE, CEG, PG
EDUCATION
x ǤǤȋ‡“—‹˜Ȍ‰‹‡‡”‹‰
‡‘Ž‘‰›ƒ†
‡‘–‡
А‹
•ǡ‹˜‡”•‹–›‘ˆ‘”–•‘—–Šǡ‰Žƒ†ǡͳͻͺͷ

PROFESSIONAL REGISTRATIONS/CERTIFICATIONS
x ʹͲͲ͵Ȁ
‡‘–‡
А‹
ƒŽ‰‹‡‡”ȀƒŽ‹ˆ‘”‹ƒȀ
ʹ͸ʹ͸
x ͳͻͻͷȀ‡‰‹•–‡”‡†‹˜‹Ž‰‹‡‡”ȀƒŽ‹ˆ‘”‹ƒȀͷ͵͵ͺͺ
x ͳͻͻʹȀ‡”–‹ˆ‹‡† ‰‹‡‡”‹‰
‡‘Ž‘‰‹•–ȀƒŽ‹ˆ‘”‹ƒȀ
 ͳͺʹͳ ͳͻͻͳȀ”‘ˆ‡••‹‘ƒŽ
‡‘Ž‘‰‹•–ȀƒŽ‹ˆ‘”‹ƒȀ

ͷ͵͵͸

PROFESSIONAL SUMMARY
”Ǥƒ™•‘ǯ•‡†—
ƒ–‹‘ƒ†™‘”‡š’‡”‹‡
‡
‘„‹‡„‘–Ї‰‹‡‡”‹‰ƒ†‰‡‘Ž‘‰›–‘‰‹˜‡Š‹ƒ—‹“—‡ ’‡”•’‡
–‹˜‡‹–Ї‰‡‘Ž‘‰‹
ƒŽ’”‘ˆ‡••‹‘Ǥ
‡Šƒ•„‡‡‹˜‘Ž˜‡†‹—‡”‘—•’”‘Œ‡
–•–Š”‘—‰Š‘—–ƒŽ‹ˆ‘”‹ƒ
‹
Ž—†‹‰ǣ ˆƒ—Ž– •–—†‹‡•ǡ —‡”‘—• ”‡•‹†‡–‹ƒŽ ’”‘Œ‡
–•ǡ ”‡•‡”˜‘‹”
‘•–”—
–‹‘ǡ Š‹‰ŠǦ”‹•‡
‘•–”—
–‹‘ǡ
‹†‹˜‹†—ƒŽŽƒ†•Ž‹†‡‹˜‡•–‹‰ƒ–‹‘•ǡ†‹•–”‡••‡˜ƒŽ—ƒ–‹‘•ǡ ‘•–”—
–‹‘†‡ˆ‡
–ƒƒŽ›•‹•ǡƒ†‡š’‡”––‡•–‹‘›Ǥ
”Ǥƒ™•‘‹•‘‡‘ˆ‘Ž›ƒ•‡Ž‡
–ˆ‡™‹†‹˜‹†—ƒŽ•ǡ†—ƒŽŽ›”‡‰‹•–‡”‡†ƒ•„‘–Šƒ
‹˜‹Ž‡‰‹‡‡”ƒ†ƒ
‡”–‹ˆ‹‡†
‡‰‹‡‡”‹‰‰‡‘Ž‘‰‹•–Ǥ‹–Š–Ї•‡
”‡†‡–‹ƒŽ•ǡЇ‹•ƒ„އ–‘ƒ

—”ƒ–‡Ž›ƒ†‡ˆˆ‹
‹‡–Ž›”‡˜‹‡™ƒ„”‘ƒ†”ƒ‰‡
‘ˆ ‰‡‘–‡
А‹
ƒŽ ’”‘Œ‡
–•ǡ ™Š‹
Š ™‘—ކ ‘”ƒŽŽ› –ƒ‡ –Ї ‡š’‡”–‹•‡ ‘ˆ –™‘ ’”‘ˆ‡••‹‘ƒŽ•Ǥ —”‹‰ Š‹• ’”‘ˆ‡••‹‘ƒŽ
ƒ”‡‡”ǡ ”Ǥ ƒ™•‘ Šƒ• ƒ†‡ ’”‡•‡–ƒ–‹‘• –‘ —‡”‘—• ‰”‘—’•ǡ ‹ Ž—†‹‰Ǣ Š‘‡‘™‡”
ƒ••‘
‹ƒ–‹‘•ǡ
‹–›
‘—
‹Ž•ǡ ’”‘ˆ‡••‹‘ƒŽƒ••‘
‹ƒ–‹‘•ǡ
Ž‹‡–•ǡƒ†އ‰ƒŽ –‡ƒ•Ǥ˜‡” –ЇŽƒ•– ˆ‡™ ›‡ƒ”•”Ǥ ƒ™•‘Šƒ•„‡‡ƒ‡„‡”‘ˆ–Ї
Žƒ„Ǧ‘Ǧ
”‘—†‘‹––‡‡™‘”‹‰‡š–‡•‹˜‡Ž›‘–Ї’‡”ˆ‘”ƒ
‡
‘ˆ ”‡•‹†‡–‹ƒŽ ’‘•–Ǧ–‡•‹‘ ˆ‘—†ƒ–‹‘ •›•–‡• ‹ ‘—–Ї” ƒŽ‹ˆ‘”‹ƒǤ Ї ˆ‘ŽŽ‘™‹‰ ‹• ƒ Ž‹•– ‘ˆ ”‡’”‡•‡–ƒ–‹˜‡’”‘Œ‡
–•ǣ

PROJECT EXPERIENCE
x
‡‘–‡
А‹
ƒŽ ˜ƒŽ—ƒ–‹‘ ‘ˆ ‡”†‡ ƒ›‘ ƒ†•Ž‹†‡ ƒ† ‡”†‡ ƒ›‘ ‡˜‡Ž‘’‡– ‘ ƒ–‡† ‹ ƒ
އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒǤ ‡•’‘•‹„‹Ž‹–‹‡• ˆ‘” –Š‹• ’”‘Œ‡ – ‹
Ž—†‡†
‘’އ–‡ ‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ ‘ˆ –Ї
Žƒ†•Ž‹†‡ǡƒ•™‡ŽŽƒ•–Ї•–ƒ„‹Ž‹–›‘ˆ–Ї•—””‘—†‹‰ƒ”‡ƒǤ x 𒇔– ‹–‡•• ƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒǤ ”‘˜‹†‡† ‡š’‡”– ™‹–‡•• •‡”˜‹ ‡• †—”‹‰ †‹•’—–‡ ‘ˆ ’‘–‡–‹ƒŽ
Žƒ†•Ž‹†‡†ƒƒ‰‡–‘„Ž—ˆˆ–‘’Š‘‡•Ǥ
x 𒇔–‹–‡••ƒ‰—ƒ‡ƒ
ŠǡƒŽ‹ˆ‘”‹ƒǤ”‘˜‹†‡†‡š’‡”–™‹–‡•••‡”˜‹
‡•ƒ••‘
‹ƒ–‡†™‹–Š–Ї†‹•–”‡••‘ˆ
ƒ ”‡•‹†‡
‡ ‹ ƒ‰—ƒ ‡ƒ
Š †—‡ –‘ •—„•—”ˆƒ
‡
‘†‹–‹‘•Ǥ ‡”˜‹
‡• ‹
Ž—†‡† •—„•—”ˆƒ
‡ ‹˜‡•–‹‰ƒ–‹‘ǡ
’”‡’ƒ”ƒ–‹‘‘ˆ”‡’ƒ‹””‡
‘‡†ƒ–‹‘•ǡƒ†’ƒ”–‹
‹’ƒ–‹‘‹ƒ”„‹–”ƒ–‹‘Ǥ
x ‘Ž‘› ‘˜‡ Ž—ˆˆ –ƒ„‹Ž‹œƒ–‹‘ ‘
ƒ–‡† ‹ ƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒǤ Š‹• ’”‘Œ‡
–
‘•‹•–‡† ‘ˆ –Ї
”‡‡†‹ƒ–‹‘‘ˆƒ—•–ƒ„އ„Ž—ˆˆƒŽ‘‰ƒ
‹ˆ‹
‘ƒ•–
‹‰Š™ƒ›„‡Ž‘™–Ї”‡•‹†‡–‹ƒŽ
‘—‹–›‘ˆ‘Ž‘›
‘˜‡Ǥ ‡•’‘•‹„އ ˆ‘” ƒŽŽ ‰‡‘–‡
А‹
ƒŽ ‹••—‡• ƒ† ’”‘Œ‡
– ƒƒ‰‡‡– †—”‹‰
‘•–”—
–‹‘ ‘ˆ ƒ
547

Page 16 ends

ƒ’’”‘š‹ƒ–‡Ž›ͺͲͲǦˆ‘‘–
‘’‘•‹–‡–‹‡„ƒ
”‡–ƒ‹‹‰™ƒŽŽƒ†•‘‹ŽǦƒ‹Ž†‹ƒ’Š”ƒ‰ǤŠ‹•’”‘Œ‡
–”‡“—‹”‡†
‡š–‡•‹˜‡
‘•–”—
–‹‘‘‹–‘”‹‰ƒ†–‡•–‹‰ǡƒ•™‡ŽŽƒ•ˆ‹‡Ž†‘†‹ˆ‹
ƒ–‹‘†—”‹‰
‘•–”—
–‹‘Ǥ
x ‘”‡•‹

‡‘–‡
А‹
ƒŽ
˜‡•–‹‰ƒ–‹‘‘ˆ‹•–”‡••‡†
‘—•‡•‘
ƒ–‡†‹ƒ
—ƒƒ’‹•–”ƒ‘ǡƒŽ‹ˆ‘”‹ƒǤŠ‹•
‹‹–‹ƒŽŽ›‹
Ž—†‡†ƒ†‡–ƒ‹Ž‡†•–—†›‘ˆ’”‡˜‹‘—•‰‡‘Ž‘‰›”‡’‘”–•‘–Їƒ”‡ƒǡƒ††‡–ƒ‹Ž‡†‰‡‘Ž‘‰‹ ƒ’’‹‰
‘ˆƒ
‹‡–Žƒ†•Ž‹†‡•ˆ”‘•–‡”‡‘‰”ƒ’Š‹
ƒ‡”‹ƒŽ’Š‘–‘‰”ƒ’Š•Ǥ—„•‡“—‡–Ž›ǡƒ–Š‘”‘—‰Šˆ‹‡Ž†‹˜‡•–‹‰ƒ–‹‘ ™ƒ•’‡”ˆ‘”‡†‹
Ž—†‹‰•—”ˆƒ
‡ƒ’’‹‰ǡ†”‹ŽŽ‹‰ǡƒ††‘™Š‘އŽ‘‰‰‹‰‘ˆͳͷŽƒ”‰‡Ǧ†‹ƒ‡–‡”„‘”‡Š‘އ•ǡ ƒ† ‹•–ƒŽŽƒ–‹‘ ƒ† ‘‹–‘”‹‰ ‘ˆ ͳʹ •Ž‘’‡ ‹
Ž‹‘‡–‡”• ƒ† ’‡—ƒ–‹
 ’‘”‡Ǧ’”‡••—”‡ –”ƒ•†—
‡”•Ǥ
”‘–Š‹•‹˜‡•–‹‰ƒ–‹‘ǡ‹–™ƒ•’‘••‹„އ–‘†‡–‡”‹‡ƒ

—”ƒ–‡‰‡‘Ž‘‰‹
ƒŽ
‘†‹–‹‘•ƒ––Ї•‹–‡Ǥ—„•‡“—‡–
–‘ –Š‹• ‹˜‡•–‹‰ƒ–‹‘ǡ ”Ǥ ƒ™•‘ ™ƒ• ”‡•’‘•‹„އ ˆ‘” –Ї †‡•‹‰ ƒ† ‹’އ‡–ƒ–‹‘ ‘ˆ —‹“—‡ ”‡‡†‹ƒ–‹‘‡–Š‘†•Ǥ
x ‘’‘ˆ–Ї‘”ކ‡•‡”˜‘‹”‘
ƒ–‡†‹ƒ‰—ƒ‡ƒ
ŠǡƒŽ‹ˆ‘”‹ƒǤ‡•’‘•‹„އ ˆ‘”–Ї‰‡‘–‡
А‹
ƒŽ‹••—‡•
”‡Žƒ–‹‰–‘–Ї†‡•‹‰ƒ†
‘•–”—
–‹‘‘ˆƒʹǦ‹ŽŽ‹‘Ǧ‰ƒŽŽ‘„—”‹‡†”‡•‡”˜‘‹”ǡ™Š‹
Š‹
Ž—†‡†•‡˜‡”ƒŽ‹Ž‡•
‘ˆͳ͸Ǧ‹
Š –”ƒ•‹••‹‘Ž‹‡Ǥ—‡ –‘ –Ї”‡Žƒ–‹˜‡Ž›—‹“—‡’‘•–Ǧ–‡•‹‘†‡•‹‰‘ˆ –Ї –ƒǡƒ•™‡ŽŽƒ• –Ї ”‡•‡”˜‘‹”•ǯ Ž‘
ƒ–‹‘ǡ ‰‡‘–‡
А‹
ƒŽ ‹••—‡• ƒ†
‘•–”—
–‹‘ ‹•’‡
–‹‘ ’Žƒ›‡† ƒ ‹’‘”–ƒ– ”‘އ ‹ –Ї
•—

‡••ˆ—Ž
‘’އ–‹‘‘ˆ–Ї’”‘Œ‡
–Ǥ
x ‘•–”—
–‹‘‘ˆ͸ͷ‹‰Ž‡Ǧ ƒ‹Ž›
‘‡•‡•‹†‡–‹ƒŽ
‹ŽŽ•‹†‡‘—‹–›‘
ƒ–‡†‹ƒ
—ƒƒ’‹•–”ƒ‘ǡ
ƒŽ‹ˆ‘”‹ƒǤ
‡‘–‡
А‹
ƒŽ‹˜‡•–‹‰ƒ–‹‘–Š”‘—‰Š
‘•–”—
–‹‘‘ˆƒŒ‘””‡•‹†‡–‹ƒŽ†‡˜‡Ž‘’‡–‹ƒ
—ƒ
ƒ’‹•–”ƒ‘ǤŠ‹••‹–‡Šƒ†ƒ’’”‘š‹ƒ–‡Ž›ͳ͵ƒŒ‘”Žƒ†•Ž‹†‡•–Šƒ–™‡”‡†‡Ž‹‡ƒ–‡†–Š”‘—‰Š‘—––Ї’”‘Œ‡ –Ǥ
‡•’‘•‹„‹Ž‹–‹‡• ‘ –Š‹• ’”‘Œ‡
–‹
Ž—†‡† •–”ƒ–‹‰”ƒ’Š‹

‘””‡Žƒ–‹‘ ‘ˆ †‹•
”‡–‡
Žƒ› „‡†• –Šƒ– ˆ‘”‡† –Ї
„ƒ•ƒŽ ”—’–—”‡ •—”ˆƒ
‡• ‘ˆ –Ї Žƒ†•Ž‹†‡•ǡ ƒƒŽ›•‹• ‘ˆ ’”‡˜‹‘—• ‰‡‘–‡ А‹
ƒŽ ”‡’‘”–•ǡ ƒ† ™”‹–‹‰ ƒ
‰‡‘–‡
А‹
ƒŽͶͲǦ•
ƒŽ‡‰”ƒ†‹‰’Žƒ”‡˜‹‡™ǤŠƒŽŽ‡‰‡•‹–‹‰ƒ–‡†™‹–Љ‡‘–‡ А‹
ƒŽ†‡•‹‰‹
Ž—†‡†•Ž‘’‡
•–ƒ„‹Ž‹œƒ–‹‘„—––”‡••‡•ǡ†‡™ƒ–‡”‹‰‘ˆ•ƒ–—”ƒ–‡†ƒŽŽ—˜‹— ‘
—””‡–™‹–Šˆ‹ŽŽ’Žƒ
‡‡–ǡƒ†ˆ‘—†ƒ–‹‘
†‡•‹‰ˆ‘”Š‹‰ŠŽ›‡š’ƒ•‹˜‡ƒ†
‘””‘•‹˜‡•‘‹Ž•Ǥ
x
‡‘–‡
А‹
ƒŽ ˜ƒŽ—ƒ–‹‘ ‘ˆ ‹•–”‡••‡† ‡™‡” ‹‡ ‘
ƒ–‡† ‹ ƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒǤ Š‹• ’”‘Œ‡
–
‡–ƒ‹Ž‡†”‡˜‹‡™‘ˆ‰‡‘–‡
А‹
ƒŽ
‘†‹–‹‘•ƒ––Ї‹‡”‘™Ž”‡ƒ‘ˆƒއ‡–‡–‘‡˜ƒŽ—ƒ–‡–Ї’‘••‹„އ

ƒ—•‡•‘ˆ–Ї‘„•‡”˜‡††‹•–”‡••–‘ƒƒ
‹‡–•‡™‡”Ž‹‡ƒ†Œƒ
‡––‘–Ї”ƒ‹Ž”‘ƒ†–”ƒ
•Ǥ
x
‡‘–‡
А‹
ƒŽ–ƒ„‹Ž‹œƒ–‹‘‘ˆƒƒŒ‘”
‹‡–ƒ†•Ž‹†‡‘
ƒ–‡†‹ƒ‰—ƒ‹‰—‡ŽǡƒŽ‹ˆ‘”‹ƒǤŠ‹•‹
Ž—†‡†
ƒ’’‹‰‘ˆ–Ї‡š
ƒ˜ƒ–‹‘ƒ•‹––‘‘’Žƒ
‡ǡƒ†ƒ‹‰”‡
‘‡†ƒ–‹‘•–‘–Ї
‘–”ƒ
–‘”‘–Ї‡–Š‘†
‘ˆ‡š
ƒ˜ƒ–‹‘Ǥ
–ƒŽ•‘‹
Ž—†‡†‘‹–‘”‹‰–Ї
‘–‹—‡†•–ƒ„‹Ž‹–›‘ˆ–ЇŽƒ†•Ž‹†‡„›”‡ƒ†‹‰ƒ†ƒƒŽ›•‹• ‘ˆ•Ž‘’‡‹
Ž‹‘‡–‡”†ƒ–ƒǤ
x
‡‘–‡
А‹
ƒŽ‡‡†‹ƒ–‹‘‘ˆƒ‡–ƒƒƒ†•Ž‹†‡‘
ƒ–‡†‹ƒƒ‘‹–ǡƒŽ‹ˆ‘”‹ƒǤЇ’”‘Œ‡
–‹˜‘Ž˜‡†
”‡‡†‹ƒ–‹‘ ‘ˆ ƒ ƒŒ‘” Žƒ†•Ž‹†‡ –Šƒ– ˆƒ‹Ž‡† ƒ
”‘•• ƒ
‹ˆ‹
 ‘ƒ•–
‹‰Š™ƒ›Ǥ ‡‡†‹ƒ–‹‘ ‹
Ž—†‡†

‘•–”—
–‹‘‘ˆƒ–‹‡„ƒ
”‡–ƒ‹‹‰™ƒŽŽǡ‡ƒ”–Љ”ƒ†‹‰ƒ†
‘
”‡–‡•
—Ž’–‹‰Ǥ
x
‡‘–‡
А‹
ƒŽ ‡˜‹‡™‡” ˆ‘” –Ї ‹–› ‘ˆ ƒ
—ƒ ƒ’‹•–”ƒ‘ǡ ƒŽ‹ˆ‘”‹ƒǤ ”Ǥ ƒ™•‘ ƒ† 
 ’”‘˜‹†‡
‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™•‡”˜‹
‡•ˆ‘”–Ї‹–›‘ˆƒ
—ƒƒ’‹•–”ƒ‘Ǥ‘”Šƒ•‹
Ž—†‡†„‘–Š”‡˜‹‡™•‘ˆ‘–Ї”
‰‡‘–‡
А‹
ƒŽ
‘•—Ž–ƒ–ǯ•™‘”ǡƒ•™‡ŽŽƒ•™‘”’‡”ˆ‘”‡††‹”‡
–Ž›ˆ‘”–Ї‹–›Ǥ
x ‡˜‹‡™• Šƒ˜‡ ‹
Ž—†‡†Ǣ —Ž–‹Ǧ‹ŽŽ‹‘
—„‹
 ›ƒ”† ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–•ǡ •
Š‘‘Ž •‹–‡•ǡ ”‡•‡”˜‘‹” •‹–‡•ǡ
•Ž‘’‡†‹•–”‡••’”‘Œ‡
–•ǡƒ•™‡ŽŽƒ•ƒ—Ž–‹–—†‡‘ˆ‹•
‡ŽŽƒ‡‘—•‰‡‘–‡
А‹
ƒŽ‹••—‡•Ǥ‘”’‡”ˆ‘”‡† ˆ‘”
–Ї ‹–› Šƒ• ‹
Ž—†‡† ‰”ƒ†‹‰ ’Žƒ ”‡˜‹‡™ ‘ˆ —„Ž‹
 ‘”• ’”‘Œ‡
–•ǡ ‡˜ƒŽ—ƒ–‹‘ ‘ˆ •Ž‘’‡ †‹•–”‡••
–Š”‡ƒ–‡‹‰‹–›Žƒ†ǡƒ†
‘•–”—
–‹‘‘„•‡”˜ƒ–‹‘ƒ†–‡•–‹‰Ǥ
x ”‹
‹’ƒŽ ‰‹‡‡”Ȁ
‡‘Ž‘‰‹•– ˆ‘” –Ї ‡˜‡Ž‘’‡– ‘ˆ ‘”•–‡”
‹‰ŠŽƒ†•ǡ ƒ ‡•‹†‡–‹ƒŽ ‡˜‡Ž‘’‡–
‘
ƒ–‡†‹ƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒǤ”Ǥƒ™•‘™ƒ•‹
Šƒ”‰‡‘ˆƒŽŽ‰‡‘–‡
А‹
ƒŽƒ•’‡
–•‘ˆ–Š‹•’”‘Œ‡
–ǡ
™Š‹
Š‹˜‘Ž˜‡†–Ї†‡˜‡Ž‘’‡–‘ˆƒ’’”‘š‹ƒ–‡Ž›ͶͳͻŠ‘‡•ƒ†ͳͳ‹ŽŽ‹‘ —„‹
›ƒ”†•‘ˆ‰”ƒ†‹‰Ǥ
x ”‹
‹’ƒŽ‰‹‡‡”Ȁ
‡‘Ž‘‰‹•–ˆ‘”–Ї‡‡”‰‡
›”‡‡†‹ƒ–‹‘’Žƒˆ‘”•–‘”ƒ
–‹˜ƒ–‡†ƒŒ‘”Žƒ†•Ž‹†‡•‹
‹–› ‘ˆ ƒ
—ƒ ƒ’‹•–”ƒ‘ǡ ƒŽ‹ˆ‘”‹ƒ †—”‹‰ ™‹–‡” ʹͲͲͶǦʹͲͲͷǤ ‘” ‹˜‘Ž˜‡† †‡˜‡Ž‘’‡– ‘ˆ 548

Page 17 ends

‡‡”‰‡
›‰”ƒ†‹‰’Žƒ•ƒ†
ƒ‹••‘ƒ†–‹‡„ƒ
”‡’ƒ‹”•ǡ’”‘–‡
–‹‘‘ˆ‡š‹•–‹‰Š‘‡•ǡƒ†™‘”‹‰™‹–Š
˜ƒ”‹‘—•ƒ‰‡
‹‡•–‘ƒ‹–ƒ‹—–‹Ž‹–‹‡••‡”˜‹
‡•†—”‹‰”‡’ƒ‹”•Ǥ
x
‡‘–‡
А‹
ƒŽ ‡˜‹‡™‡” ˆ‘” –Ї ‹–› ‘ˆ ƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒǤ ”Ǥ ƒ™•‘ Šƒ• ’”‘˜‹†‡† ‰‡‘–‡ А‹
ƒŽ
”‡˜‹‡™•‡”˜‹
‡•‘ƒ‘Ǧ
ƒŽŽ„ƒ•‹• ˆ‘” –Ї‹–›‘ˆƒއ‡–‡ƒ•™‡ŽŽƒ•’”‘˜‹†‹‰†‹”‡ –‰‡‘–‡
А‹
ƒŽ
•‡”˜‹
‡•ˆ‘”–Ї‹–›ǡ‹
Ž—†‹‰ƒއ‡–‡
‡ƒ”ƒ‹Žǡƒއ‡–‡ƒ•–‡ƒ–‡””‡ƒ–‡–Žƒ–ǡƒ† •‡˜‡”ƒŽŽ‘
ƒŽ’ƒ”•Ǥ‡˜‹‡™•‹‰‡‡”ƒŽ”‡Žƒ–‡–‘ƒŒ‘”Žƒ†•Ž‹†‡•–Šƒ–‡š‹•––Š”‘—‰Š–Ї‹–›Ǥ”Ǥƒ™•‘ Šƒ•’‡”ˆ‘”‡†”‡˜‹‡™‘ˆ’”‘’‘•‡†”‡’ƒ‹”’Žƒ•„›˜ƒ”‹‘—• ‘•—Ž–ƒ–•Ǥ
x
‡‘–‡
А‹
ƒŽ ‘•—Ž–ƒ– ˆ‘” DzЇ
”‡ƒ– ƒ”dz ƒ– –Ї ˆ‘”‡” Ž ‘”‘ ƒ”‹‡ ‹” ‘”’• –ƒ–‹‘ǡ Ž ‘”‘ǡ ƒŽ‹ˆ‘”‹ƒǤŠ‹•‘‰‘‹‰’”‘Œ‡
–‹
Ž—†‡•–Ї‡š
ƒ˜ƒ–‹‘‘ˆƒ
ƒ›‘ǡ
‘•–”—
–‹‘‘ˆ•‹š„”‹†‰‡•ǡƒ–—‡Ž
ƒ†—‡”‘—•‘–Ї”‹’”‘˜‡‡–•Ǥ
x ”‹
‹’ƒŽ‰‹‡‡”Ȁ
‡‘Ž‘‰‹•– ˆ‘”ƒ”„އЇƒ†‘ƒ•–ƒŽ‡˜‡Ž‘’‡–ǡ ‹–› ‘ˆƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒǤ”Ǥ ƒ™•‘‹• –Ї
‡‘–‡
А‹
ƒŽ ‘•—Ž–ƒ– ˆ‘” –Ї †‡˜‡Ž‘’‡– ‘ˆƒʹͷͲǦƒ
”‡ ”‡•‹†‡–‹ƒŽ
‘—‹–›‹ –Ї

‘ƒ•–ƒŽœ‘‡ǤЇ’”‘Œ‡
–‹
Ž—†‡•–Ї‰‡‘–‡
А‹
ƒŽ
ŠƒŽŽ‡‰‡•‘ˆ’”‘–‡
–‡†ƒ–—”ƒŽ
ƒ›‘•–”ƒ•‡
–‹‰–Ї
’”‘Œ‡
–ǡ ƒŒ‘” ”‘ƒ† „”‹†‰‡•ǡ ‰”‘—†™ƒ–‡” ƒ‹–‡ƒ
‡ǡ ƒ† •‡‰‡–ƒŽ ™ƒŽŽ
‘•–”—
–‹‘Ǥ Ї ’”‘Œ‡
–
‹
Ž—†‡†‹–‡”ƒ
–‹‘™‹–Šƒ‰‡
‹‡••—
Š–ЇƒŽ‹ˆ‘”‹ƒ‘ƒ•–ƒŽ‘‹••‹‘ǡƒ†
‘‘”†‹ƒ–‹‘™‹–ŠƒŽ–”ƒ•
ˆ‘”
‘•–”—
–‹‘‘ˆ™ƒŽŽ•ƒ†„”‹†‰‡•™‹–Š‹–Ї‹””‹‰Š–Ǧ‘ˆǦ™ƒ›Ǥ
PROFESSIONAL HISTORY
ʹͲͳͳǦ’”‡•‡–ǣ
†‡’‡†‡–
‡‘–‡
А‹
ƒŽ‘•—Ž–ƒ–
ʹͲͲͳǦʹͲͳͳǣ ”‡•‹†‡–ǡƒ™•‘Ƭ••‘
‹ƒ–‡•
‡‘–‡
А‹
ƒŽ‘•—Ž–‹‰ǡ

Ǥǡƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒ
ʹͲͲͲǦʹͲͲͳǣ
†‡’‡†‡–
‡‘–‡
А‹
ƒŽ‘•—Ž–ƒ–
ʹͲͲͲǣ ‰‹‡‡”‹‰
‡‘Ž‘‰›‡
–—”‡”ǡƒ††Ž‡„ƒ
‘ŽŽ‡‰‡ǡ‹••‹‘‹‡Œ‘ǡƒŽ‹ˆ‘”‹ƒ
ͳͻͻͺǦʹͲͲͲǣ ‹
‡”‡•‹†‡–ǡ”‹
‹’ƒŽ‰‹‡‡”Ȁ
‡‘Ž‘‰‹•–ǡ‡‹‰Š–‘ƒ†••‘
‹ƒ–‡•ǡ

Ǥǡ”ƒ‰‡‘—–›
ˆˆ‹
‡ǡ
”˜‹‡ǡƒŽ‹ˆ‘”‹ƒ
ͳͻͻ͸Ǧͳͻͻͺ ”‹
‹’ƒŽ‰‹‡‡”Ȁ
‡‘Ž‘‰‹•–ǡ‡‹‰Š–‘ƒ†••‘
‹ƒ–‡•ǡ

Ǥǡ”ƒ‰‡‘—–›ˆˆ‹
‡ǡ
”˜‹‡ǡ
ƒŽ‹ˆ‘”‹ƒ
ͳͻͻͶǦͳͻͻ͸ǣ ”‘Œ‡
–Ȁ‡‹‘””‘Œ‡
–‰‹‡‡”Ȁ
‡‘Ž‘‰‹•–ǡ‡‹‰Š–‘ƒ†••‘
‹ƒ–‡•ǡ

Ǥǡ”ƒ‰‡‘—–›
ˆˆ‹
‡ǡ
”˜‹‡ǡƒŽ‹ˆ‘”‹ƒ
ͳͻͺͻǦͳͻͻͶǣ –ƒˆˆȀ‡‹‘”–ƒˆˆ‰‹‡‡”Ȁ
‡‘Ž‘‰‹•–ǡ”‘Œ‡
–ƒƒ‰‡”ǡ‡‹‰Š–‘ƒ†••‘
‹ƒ–‡•ǡ

Ǥǡ
”ƒ‰‡‘—–›‡‰‹‘ƒŽ‡–‡”ǡ
”˜‹‡ǡƒŽ‹ˆ‘”‹ƒ
ͳͻͺͺǦͳͻͺͻǣ ‹–‡‰‹‡‡”ǡ
Ƭ‘•–”—
–‹‘ǡ‘Ž‘”ƒ†‘
ͳͻͺͷǦͳͻͺ͸ǣ ‰‹‡‡”‹‰
‡‘Ž‘‰‹•–ǡƒ””‹‡ ‹‡Ž†‡”ǡ‘”–•‘—–Šǡ‰Žƒ†

HONORS AND PROFESSIONAL SOCIETIES
x ‡„‡”‘ˆ••‘
‹ƒ–‹‘‘ˆ‰‹‡‡”‹‰
‡‘Ž‘‰‹•–•
x ‡„‡”‘ˆ‡”‹
ƒ‘
‹‡–›‘ˆ‹˜‹Ž‰‹‡‡”•
549

Page 18 ends

SELECTED LANDSLIDE EXPERIENCE
x ‡””ƒ„ƒ›‘—–Šƒ†•Ž‹†‡Ȃƒ ”ƒ
‹•
‘
x ‡”†‡ƒ›‘ƒ†•Ž‹†‡Ȃ”ƒ‰‡‘—–›Žƒ
‹–ƒƒ†•Ž‹†‡Ȃ”ƒ‰‡‘—–›
x ‘”•–‡”
‹‰ŠŽƒ†•‡˜‡Ž‘’‡–ȋ—Ž–‹’އƒ†•Ž‹†‡•ȌȂ”ƒ‰‡‘—–› x ƒ
‹ˆ‹
‘‹–‡‡˜‡Ž‘’‡–ȋ—Ž–‹’އƒ†•Ž‹†‡•ȌȂ”ƒ‰‡‘—–› x ƒ
—ƒ‡ƒ†‘™•Ȃ”ƒ‰‡‘—–›
x ‘‘ƒȂ‘•‰‡Ž‡•‘—–›
x Ž—‡‹”†ƒ›‘Ȃ”ƒ‰‡‘—–›
x ‘ƒƒ
—ƒ‡˜‡Ž‘’‡–ȋ—Ž–‹’އƒ†•Ž‹†‡•ȌȂ”ƒ‰‡‘—–›
x ƒ‹‘‡Ž˜‹‘ƒ†•Ž‹†‡Ȃ”ƒ‰‡‘—–›
x ‹–‡
‹ŽŽƒ†•Ž‹†‡Ȃ”ƒ‰‡‘—–›
x ‡ƒ‹‡™•–ƒ–‡•Ȃ”ƒ‰‡‘—–›
SELECTED LEGAL/EXPERT EXPERIENCE
x
‡‘–‡
А‹
ƒŽ𒇔–ˆ‘” ‘‹Žƒ‹Žƒ†‹‡„ƒ
ƒŽŽǡƒŽŽ‡Œ‘ǡ
x
‡‘–‡
А‹
ƒŽ𒇔–ˆ‘” ‘’‘ˆŽ‘’‡‘‹Ž‘˜‡‡–ǡ‹••‹‘‹‡Œ‘ǡ x
‡‘–‡
А‹
ƒŽ𒇔–ˆ‘” 
‡‘‰”‹†ƒŽŽ‘˜‡‡–ǡƒ‹‡‰‘ǡ
x
‡‘–‡
А‹
ƒŽ𒇔–ˆ‘”‹–›‘ˆƒ
—ƒƒ’‹•–”ƒ‘Ž‘’‡
•–ƒ„‹Ž‹–›ǡƒ
—ƒƒ’‹•–”ƒ‘ǡ
x
‡‘–‡
А‹
ƒŽ𒇔–ˆ‘”‹–›‘ˆ‘‘ƒƒ†•Ž‹†‡–ƒ„‹Ž‹–›ǡ‘‘ƒǡ x
‡‘–‡
А‹
ƒŽ 𒇔– ˆ‘”‘—–Š ‘ƒ•–ƒ–‡”‹•–”‹
– ƒ†•Ž‹†‡ –ƒ„‹Ž‹–›ǡ”ƒ‰‡ ‘—–›ǡ 
‡‘–‡
А‹
ƒŽ
𒇔–ˆ‘”ƒ”‹‘—•‡•‹†‡–‹ƒŽ‡˜‡Ž‘’‡”‡˜‹‡™‹‰‘’‘ˆŽ‘’‡ ”‘—†‘˜‡‡–ǡ”ƒ‰‡‘—–›ǡ
550

Page 19 ends

BRAD ZELLMER, PE, GE

EDUCATION
x ǤǤ‹˜‹Ž‰‹‡‡”‹‰ǡƒŽ‹ˆ‘”‹ƒ‘Ž›–‡
А‹
–ƒ–‡‹˜‡”•‹–›ǡƒ—‹•„‹•’‘ǡͳͻͻ͸
x ǤǤ‹˜‹Ž‰‹‡‡”‹‰ǡƒŽ‹ˆ‘”‹ƒ–ƒ–‡‹˜‡”•‹–›‘‰‡ƒ Šǡͳͻͻ͵

PROFESSIONAL REGISTRATIONS
x ‡‰‹•–‡”‡†
‡‘–‡
А‹
ƒŽ‰‹‡‡”ȀƒŽ‹ˆ‘”‹ƒȀ
ʹ͸ͳͺȀʹͲͲ͵
x ‡‰‹•–‡”‡†‹˜‹Ž‰‹‡‡”ȀƒŽ‹ˆ‘”‹ƒȀͷͺ͹ͲͶȀͳͻͻͺ x ‹Ž‡”‹˜‹‰
•’‡
–‘”Ȁ‹–›‘ˆ
”˜‹‡Ȁͳ͸ͳ͹

PROFESSIONAL SUMMARY
”Ǥ
‡ŽŽ‡”ǯ•‡š’‡”‹‡
‡‡
‘’ƒ••‡•ƒ™‹†‡”ƒ‰‡‘ˆ
‹˜‹Žƒ†‰‡‘–‡
А‹
ƒŽ‡‰‹‡‡”‹‰’”‘Œ‡
–•ǡ‹
Ž—†‹‰
Žƒ”‰‡Ǧ•
ƒŽ‡ ’—„Ž‹
 ™‘”•ǡ
‘‡”
‹ƒŽ ƒ† ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ’”‘Œ‡
–•Ǥ ‡•’‘•‹„‹Ž‹–‹‡• ‹
Ž—†‡
‡˜ƒŽ—ƒ–‹‘‘ˆ ˆ‘—†ƒ–‹‘
ƒ’ƒ
‹–›ǡŽ‹“—‡ˆƒ
–‹‘ǡ•Ž‘’‡•–ƒ„‹Ž‹–›ǡ‰”‘—†•‡––އ‡–ƒ†‰”‘—†‹’”‘˜‡‡– ƒŽ–‡”ƒ–‹˜‡•Ǥ ”‘Œ‡
– ‡š’‡”‹‡
‡ ”ƒ‰‡• ˆ”‘ †‡‡’ ˆ‘—†ƒ–‹‘ •›•–‡• –‘ •Ž‘’‡ •–ƒ„‹Ž‹œƒ–‹‘Ǥ 𖇐•‹˜‡ ‡š’‡”‹‡
‡‹–Ї‰‡‘–‡
А‹
ƒŽ†‡•‹‰‘ˆ–‹‡„ƒ
ƒ
Š‘”ǡ•‘‹Žƒ‹Žǡƒ†‰‡‘‰”‹†”‡‹ˆ‘”
‡†”‡–ƒ‹‹‰•–”—
–—”‡•
ˆ‘”’‡”ƒ‡–ƒ†–‡’‘”ƒ”›ȋ†—”‹‰
‘•–”—
–‹‘Ȍ•–ƒ„‹Ž‹œƒ–‹‘Ǥ


PROJECT EXPERIENCE
x ‡‹‘” ‰‹‡‡” ˆ‘” ˆ‹‡Ž† ‹˜‡•–‹‰ƒ–‹‘ ˆ‘” –Ї ƒ’’”‘š‹ƒ–‡Ž› ͺǤͷǦ‹Ž‡ǦŽ‘‰ Ž‹‰Š– ”ƒ‹Ž ”‡•Šƒ™Ȁ ”ƒ•‹– ‘””‹†‘” ’”‘Œ‡
–Ǥ Žƒ‡† ƒŽ‹‰‡– ‹
Ž—†‡• —‡”‘—• „”‹†‰‡ •–”—
–—”‡•ǡ –™‘
—–Ǧƒ†Ǧ
‘˜‡”
–—‡Ž•ƒ†‘‡„‘”‡†–—‡ŽǤ‘‘”†‹ƒ–‡†‰‡‘–‡
А‹
ƒŽˆ‹‡Ž†‹˜‡•–‹‰ƒ–‹‘–Šƒ–‹
Ž—†‡†—‡”‘—•”‘–ƒ”›
™ƒ•ŠǡŠ‘ŽŽ‘™•–‡ƒ†•‘‹
„‘”‹‰•ƒ†™‡ŽŽƒ•‘‡‡‡–”ƒ–‹‘‡•–•ȋ•ȌǤ
Ǧ•‹–—ˆ‹‡Ž†–‡•–•‹
Ž—†‡†
’”‡••—”‡ ‡–‡”ǡ ’ƒ
‡” –‡•–ǡ ƒ† „‘”‡Š‘އ †‘™Š‘އ •Їƒ” ™ƒ˜‡ Ž‘‰‰‹‰Ǥ ƒ–ƒ ™ƒ• ”‡“—‹”‡† ˆ‘” –Ї ‰‡‘–‡
А‹
ƒŽ„ƒ•‡Ž‹‡”‡’‘”–Ǥ
x ‡‹‘”‰‹‡‡”ˆ‘””ƒ‹Ž‡š’ƒ•‹‘‘ˆ‹‡” ƒ––Ї‘”–‘ˆ‘‰‡ƒ ŠǡƒŽ‹ˆ‘”‹ƒǤ”‘Œ‡
–‹
Ž—†‡†‘˜‡”ƒ
‹Ž‡ ‘ˆ ”‡–ƒ‹‹‰ ™ƒŽŽ •–”—
–—”‡•ǡ
‘’”‡••‡† ƒ‹” ˆƒ
‹Ž‹–› ƒ† –Ї ”‡ƒŽ‹‰‡– ‘ˆ
ƒ”„‘” 
‡‹
 ”‹˜‡Ǥ
‘‘”†‹ƒ–‡† ˆ‹‡Ž† ‹˜‡•–‹‰ƒ–‹‘
‘•‹•–‹‰ ‘ˆ —‡”‘—•  •‘—†‹‰• ƒ† Š‘ŽŽ‘™ •–‡ ƒ—‰‡” „‘”‹‰•Ǥ ”‘˜‹†‡†‰‡‘–‡
А‹
ƒŽ”‡
‘‡†ƒ–‹‘•ˆ‘”–Ї’Žƒ‡†‹’”‘˜‡‡–•Ǥ
x ‡‹‘” ‰‹‡‡” ˆ‘” —”Ž‹‰–‘ ‘”–Ї” ƒ–ƒ ‡ ȋ Ȍ ‰”ƒ†‡ •‡’ƒ”ƒ–‹‘ ‹ Žƒ ‡–‹ƒǡ ƒŽ‹ˆ‘”‹ƒǤ
”‘˜‹†‡† ‰‡‘–‡
А‹
ƒŽ ”‡
‘‡†ƒ–‹‘• ˆ‘” –™‘Ǧ•’ƒ ”ƒ‹Ž „”‹†‰‡ ƒ† ”‡–ƒ‹‹‰ ™ƒŽŽ •–”— –—”‡• ‹
ƒ

‘”†ƒ
‡™‹–Šƒ†ƒŽ–”ƒ•”‡“—‹”‡‡–•ǡ”‡•’‡
–‹˜‡Ž›Ǥ‹–‡Šƒ†”‡–ƒ‹‹‰™ƒŽŽ•–”—
–—”‡•—’–‘
ʹͺˆ‡‡–‹Ї‹‰Š–™‹–ŠŽ‹‹–‡†
‘•–”—
–‹‘”‹‰Š–Ǧ‘ˆǦ™ƒ›Ǥ
x ‡‹‘” ‰‹‡‡” ˆ‘” ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ †‹•‘ ȋȌ •—„•–ƒ–‹‘ ƒ– –Ї ‘”– ‘ˆ ‘‰ ‡ƒ Šǡ ƒŽ‹ˆ‘”‹ƒǤ
‘‘”†‹ƒ–‡† ˆ‹‡Ž†‹˜‡•–‹‰ƒ–‹‘ƒ† ’”‘˜‹†‡†‰‡‘–‡
А‹
ƒŽ ”‡
‘‡†ƒ–‹‘• ˆ‘” –Ї ’”‘’‘•‡†‡Ž‡
–”‹
ƒŽ
•—„•–ƒ–‹‘Ǥ
x ‡‹‘” ‰‹‡‡” ˆ‘” –Ї ‹’”‘˜‡‡–• ƒ– ƒŽ„‘ƒ ƒ”‹ƒ ‹ ‡™’‘”– ‡ƒ Šǡ ƒŽ‹ˆ‘”‹ƒǤ —–‹‡• ‹
Ž—†‡†
’”‘˜‹†‹‰ ‰‡‘–‡
А‹
ƒŽ ˆ‹‡Ž† ‘„•‡”˜ƒ–‹‘ ƒ† •—’‡”˜‹•‹‘ ‘ˆ ‹•–ƒŽŽƒ–‹‘ ‘ˆ Œ‡––‡† ƒ† †”‹˜‡ ’‹Ž‡ ˆ‘—†ƒ–‹‘•ˆ‘”‡™†‘
•ƒ†–‹‡„ƒ
ƒ
Š‘”•ˆ‘””‡‹ˆ‘”
‡‡–‘ˆƒ‡š‹•–‹‰•‡ƒ™ƒŽŽƒŽ‘‰™‹–Š•Ї‡–
551

Page 20 ends

’‹Ž‹‰”‡“—‹”‡†ˆ‘”†‡•‹‰ƒ–‡†‡˜‹”‘‡–ƒŽ‡‡Ž‰”ƒ••’Žƒ–‡”ƒ”‡ƒǤ”‘Œ‡ –”‡“—‹”‡†ͳ͸Ͷ–‹‡„ƒ
ƒ
Š‘”•
–‘”‡‹ˆ‘”
‡ƒ‡š‹•–‹‰•‡ƒ™ƒŽŽǤ
x ‡‹‘” ”‘Œ‡
– ‰‹‡‡” ˆ‘” –Ї
‘Žˆ Ž—„Š‘—•‡ ‹ ƒ އ‡–‡ǡ ƒŽ‹ˆ‘”‹ƒǤ ”‘Œ‡
– ‹˜‘Ž˜‡† –Ї

‘•–”—
–‹‘ ‘ˆ ƒ –™‘Ǧ•–‘”› •’Ž‹–Ǧއ˜‡Ž
Ž—„Š‘—•‡ „—‹Ž†‹‰ ƒ† ƒ••‘
‹ƒ–‡† ‹’”‘˜‡‡–• ‹
Ž—†‹‰
”‡–ƒ‹‹‰™ƒŽŽ•ǡˆ‹”‡ƒ

‡••”‘ƒ†ǡ‰‘Žˆ
ƒ”–’ƒ–‹‘ƒ”‡ƒƒ†ƒ†”‹˜‹‰”ƒ‰‡Ǥ
x ‡‹‘””‘Œ‡
–‰‹‡‡”ˆ‘”–ЇͳǤ͵‹ŽŽ‹‘‰ƒŽŽ‘’ƒ”–‹ƒŽŽ›„—”‹‡†‘‘ǯ•‡•‡”˜‘‹”‹ƒ —ƒƒ’‹•–”ƒ‘ǡ
ƒŽ‹ˆ‘”‹ƒǤ‡•’‘•‹„‹Ž‹–‹‡•‹
Ž—†‡‰‡‘–‡
А‹
ƒŽ•‹–‡ƒ••‡••‡–ǡŽƒ„‘”ƒ–‘”›–‡•–ƒ••‹‰‡–ǡƒ†ƒƒŽ›•‡• ‹‘”†‡”–‘’”‘˜‹†‡ˆ‘—†ƒ–‹‘”‡
‘‡†ƒ–‹‘•ˆ‘”–Ї’”‘’‘•‡†”‡’Žƒ
‡‡–”‡•‡”˜‘‹”‹
Ž—†‹‰†‡•‹‰
Žƒ–‡”ƒŽ•–ƒ–‹
ƒ†•‡‹•‹
‡ƒ”–Š’”‡••—”‡•Ǥ
x ‡‹‘””‘Œ‡
–‰‹‡‡”ˆ‘”–Ї‡ƒ†‘™•ƒ–ƒ
—ƒƒ’‹•–”ƒ‘ǡƒŽ‹ˆ‘”‹ƒǤ”‘Œ‡
–‹
Ž—†‡•‹
”‡ƒ•‹‰–Ї
•–ƒ„‹Ž‹œƒ–‹‘ ‘ˆ ƒ ͵ͲͲǦˆ‘‘–Ǧ–Š‹
 ƒ
‹‡– „Ž‘
Ǧ‰Ž‹†‡ Žƒ†•Ž‹†‡ –Š”‘—‰Š †‡™ƒ–‡”‹‰ ˆ‘” ƒ ’”‘’‘•‡† ”‡•‹†‡–‹ƒŽ†‡˜‡Ž‘’‡–Ǥ
x ‡‹‘” ”‘Œ‡
– ‰‹‡‡” ˆ‘” ’”‘’‘•‡† ͳ͸Ǧ•–‘”› „—‹Ž†‹‰ ‹ ƒŽƒ†ǡ ƒŽ‹ˆ‘”‹ƒǤ ”‘Œ‡ – ”‡•’‘•‹„‹Ž‹–‹‡•
‹
Ž—†‹‰ ’”‘˜‹†‹‰ ƒš‹ƒŽ ƒ† Žƒ–‡”ƒŽ
ƒ’ƒ
‹–‹‡• ˆ‘” ’”‘’‘•‡† †”‹˜‡ ’‹Ž‡ ˆ‘—†ƒ–‹‘ •›•–‡Ǥ ”‘Œ‡ –
”‡“—‹”‡†Ž‹“—‡ˆƒ
–‹‘ƒƒŽ›•‹•ƒ†”‡•—Ž–‹‰‡•–‹ƒ–‡†’‹Ž‡†‘™†”ƒ‰ˆ‘” ‡•‘’”‘’‘•‡††‡‡’ˆ‘—†ƒ–‹‘
•›•–‡Ǥ
x ”‘Œ‡
–‰‹‡‡” ˆ‘””›•–ƒŽ‘˜‡‹‡™’‘”–‘ƒ•–ǡƒŽ‹ˆ‘”‹ƒǤƒ••‰”ƒ†‹‰’”‘Œ‡ –”‡“—‹”‹‰†‡‡’ ˆ‹ŽŽ•
ƒ† ‰‡‘‰”‹† ”‡‹ˆ‘”
‡‡– ˆ‘” •Ž‘’‡ •–ƒ„‹Ž‹œƒ–‹‘Ǥ ‡•’‘•‹„‹Ž‹–‹‡• ‹ Ž—†‡ •‡––އ‡– ‘‹–‘”‹‰ ƒ†
ƒƒŽ›•‹•‘ˆ†‡‡’ˆ‹ŽŽ•Ǥ
x ”‘Œ‡
– ‰‹‡‡” ˆ‘” ƒ‰‡
‹ŽŽ 
Š‘‘Ž ‹ ‡™’‘”– ‘ƒ•–ǡ ƒŽ‹ˆ‘”‹ƒǤ ‡•’‘•‹„‹Ž‹–‹‡• ‹ Ž—†‡† ’”‘˜‹†‹‰
ˆ‘—†ƒ–‹‘†‡•‹‰’ƒ”ƒ‡–‡”•ˆ‘”—‡”‘—••
Š‘‘Ž„—‹Ž†‹‰•ǡ‘˜‡”‡š
ƒ˜ƒ–‹‘”‡
‘‡†ƒ–‹‘•ǡƒ†–Ї
†‡•‹‰ ‘ˆ ƒ ƒ’’”‘š‹ƒ–‡Ž› ͳͷǦˆ‘‘–ǦŠ‹‰Š ‰‡‘‰”‹†Ǧ”‡‹ˆ‘” ‡† •‡‰‡–ƒŽ ”‡–ƒ‹‹‰™ƒŽŽŽ‘
ƒ–‡† „‡Ž‘™ –Ї
„ƒ•‡„ƒŽŽˆ‹‡Ž†Ǥ
x ”‘Œ‡
– ‰‹‡‡” ˆ‘” •‹šǦ•–‘”› ‘ˆˆ‹
‡ „—‹Ž†‹‰ Ž‘
ƒ–‡† ƒ– ƒ” Žƒ
‡ ‹
”˜‹‡ǡ ƒŽ‹ˆ‘”‹ƒǤ ”‘Œ‡
–
”‡•’‘•‹„‹Ž‹–‹‡• ‹
Ž—†‡†
‘‘”†‹ƒ–‹‘ ‘ˆ –Ї ˆ‹‡Ž† ‹˜‡•–‹‰ƒ–‹‘ǡ Žƒ„‘”ƒ–‘”› –‡•– ƒ••‹‰‡–ǡ ”‡’‘”– ’”‡’ƒ”ƒ–‹‘ǡƒ†’”‘Œ‡
–ƒƒ‰‡‡–‘ˆ„—†‰‡–Ǥ‘‘”†‹ƒ–‡†’‹Ž‡‹†‹
ƒ–‘”’”‘‰”ƒƒ†ˆ‹‡Ž†‘„•‡”˜ƒ–‹‘
†—”‹‰’‹Ž‡†”‹˜‹‰‘’‡”ƒ–‹‘•Ǥ

PROFESSIONAL HISTORY
ʹͲͳʹǦ”‡•‡–ǣ ‹”‡
–‘”‘ˆ‰‹‡‡”‹‰ǡ

‡‘–‡
А‹
ƒŽ

Ǥǡƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒ
ʹͲͲͻǦʹͲͳͳǣ ‡‹‘”‰‹‡‡”ǡƒ”–Ї
Šƒ‹
•

Ǥǡ ‘—–ƒ‹ƒŽŽ‡›ǡƒŽ‹ˆ‘”‹ƒ
ʹͲͲͺǦʹͲͲͻǣ ‡‹‘”‰‹‡‡”ǡ
‡‘–‡
А‹
ƒŽ”‘ˆ‡••‹‘ƒŽ•

Ǥǡ›’”‡••ǡƒŽ‹ˆ‘”‹ƒ
ʹͲͲ͵ǦʹͲͲͺǣ ••‘
‹ƒ–‡‰‹‡‡”ǡƒ™•‘Ƭ••‘
‹ƒ–‡•
‡‘–‡
А‹
ƒŽ‘•—Ž–‹‰ǡ

Ǥǡƒއ‡–‡ǡ
ƒŽ‹ˆ‘”‹ƒ
ͳͻͻ͸ǦʹͲͲ͵ǣ –ƒˆˆȀ‡‹‘”–ƒˆˆȀ”‘Œ‡
–‰‹‡‡”ǡ‡‹‰Š–‘ƒ†••‘
‹ƒ–‡•ǡ

Ǥǡ”ƒ‰‡‘—–›ˆˆ‹
‡ǡ

”˜‹‡ǡƒŽ‹ˆ‘”‹ƒ
’”‹‰ͳͻͻ͸ǣ ƒ„‘”ƒ–‘”›
•–”—
–‘”ǡƒŽ‹ˆ‘”‹ƒ‘Ž›–‡
А‹
–ƒ–‡‹˜‡”•‹–›ǡƒ—‹•„‹•’‘ǡƒŽ‹ˆ‘”‹ƒ
—‡”ͳͻͻͷǣ ƒ„‘”ƒ–‘”›‡
А‹
‹ƒǡ‹›‘Ƭ‘‘”‡
‡‘–‡
А‹
ƒŽ‘•—Ž–ƒ–•ǡ
”˜‹‡ǡƒŽ‹ˆ‘”‹ƒ
552

Page 21 ends

RYAN DOUGLAS, PE, GE

EDUCATION
x Ǥ
Ǥ‹‹˜‹Ž‰‹‡‡”‹‰ǡ’Šƒ•‹•
‡‘–‡
А‹
ƒŽ‰‹‡‡”‹‰ǡƒŽ‹ˆ‘”‹ƒ–ƒ–‡‹˜‡”•‹–› —ŽŽ‡”–‘ǡʹͲͳͶ x Ǥ
Ǥ‹‹˜‹Ž‰‹‡‡”‹‰ǡƒŽ‹ˆ‘”‹ƒ–ƒ–‡‹˜‡”•‹–› —ŽŽ‡”–‘ǡʹͲͳͳ

PROFESSIONAL REGISTRATIONS/CERTIFICATIONS
x ƒŽ‹ˆ‘”‹ƒǡ‡”–‹ˆ‹‡†
‡‘–‡
А‹
ƒŽ‰‹‡‡”ǡ
͵ͳͶ͹
x ƒŽ‹ˆ‘”‹ƒǡ‡‰‹•–‡”‡†‹˜‹Ž‰‹‡‡”ǡͺͶͺͶͲ

PROFESSIONAL SUMMARY
• ƒ ”‘Œ‡
– ‰‹‡‡” ˆ‘” 

‡‘–‡
А‹
ƒŽǡ ”Ǥ ‘—‰Žƒ• ‹• ƒ ”‡‰‹•–‡”‡†
‡‘–‡
А‹
ƒŽ ‰‹‡‡” ƒ† ‹˜‹Ž
‰‹‡‡”‹ –Ї–ƒ–‡ ‘ˆƒŽ‹ˆ‘”‹ƒǤ”Ǥ‘—‰Žƒ•Бކ•„‘–Šƒƒ Їޑ”ǯ•‘ˆ
‹‡
‡‹‹˜‹Ž‰‹‡‡”‹‰ƒ†
ƒ•–‡”ǯ•‡‰”‡‡‹‹˜‹Ž‰‹‡‡”‹‰™‹–Šƒ
‘
‡–”ƒ–‹‘‹
‡‘–‡
А‹
ƒŽ‰‹‡‡”‹‰ƒ†Šƒ•‘˜‡”ͳ͵›‡ƒ”•
‘ˆ ‰‡‘–‡
А‹
ƒŽ
‘•—Ž–‹‰ ‡š’‡”‹‡
‡Ǥ
‡ Šƒ• „‡‡ ‹˜‘Ž˜‡† ‹ —‡”‘—• ’”‘Œ‡
–• ‹ ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ
‹
Ž—†‹‰”‡•‹†‡–‹ƒŽǡ
‘‡”
‹ƒŽǡ‹†—•–”‹ƒŽǡ”‡–ƒ‹Žǡ –”ƒ•’‘”–ƒ–‹‘ƒ†’—„Ž‹
™‘”•Ǥ”Ǥ‘—‰Žƒ•ǯ‡š’‡”–‹•‡
‹
Ž—†‡•†‡•‹‰‘ˆ•ŠƒŽŽ‘™ƒ††‡‡’ˆ‘—†ƒ–‹‘•›•–‡•ǡ‡ƒ”–Š”‡–ƒ‹‹‰•–”— –—”‡•ǡ™ƒŽŽ†‡•‹‰ǡ„”‹†‰‡
ˆ‘—†ƒ–‹‘ †‡•‹‰ǡ •‡––އ‡– ƒƒŽ›•‹• ‘ˆ †‡‡’ ˆ‹ŽŽ• ƒ† •–”— –—”ƒŽŽ‘ƒ†‹‰ǡ •‘‹ŽŽƒ„‘”ƒ–‘”› †ƒ–ƒ ‡˜ƒŽ—ƒ–‹‘ǡ
•‡‹•‹
Šƒœƒ”†ƒƒŽ›•‹•ǡ•‹–‡Ž‹“—‡ˆƒ
–‹‘’‘–‡–‹ƒŽǡŽƒ–‡”ƒŽ•’”‡ƒ†‹‰ǡ•Ž‘’‡•–ƒ„‹Ž‹–›ǡ†‡ˆ‘”ƒ–‹‘ƒƒŽ›•‹•ƒ† Žƒ†•Ž‹†‡ •–ƒ„‹Ž‹œƒ–‹‘Ǥ
‡ Šƒ• ‡š–‡•‹˜‡ ‡š’‡”‹‡
‡‹ Š‹ŽŽ•‹†‡ ‰”ƒ†‹‰ǡ ˆŽƒ–Žƒ† ‰”ƒ†‹‰ǡ †‡‡’ ˆ‹ŽŽ ‰”ƒ†‹‰ǡ „”‹†‰‡ˆ‘—†ƒ–‹‘†‡•‹‰ƒ†ƒ‰‡
›”‡˜‹‡™•Ǥ

SELECTED PROJECT EXPERIENCE
x ”‘Œ‡
–‰‹‡‡”Ȁƒƒ‰‡”ǡͺ͹Ǧ
”‡ǡͷͲͲ‹–‡””ƒ‘—‹–ƒ•–‡”Žƒ‡†‡•‹†‡–‹ƒŽ‡˜‡Ž‘’‡–ǡ ƒ‡ ‘”‡•–Ǥ ‡”ˆ‘”‡† ƒ •—„•—”ˆƒ
‡ ‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ ƒ† ƒƒ‰‡† ‰”ƒ†‹‰ ƒ† ‰‡‘–‡
А‹
ƒŽ
‘„•‡”˜ƒ–‹‘ ƒ† –‡•–‹‰ ‘ˆ –Ї Š‹ŽŽ•‹†‡ ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ‹ Ž—†‹‰
‘•–”—
–‹‘ ‘ˆ –‡’‘”ƒ”›
•Š‘”‹‰ ™ƒŽŽ•ǡ ‡
Šƒ‹
ƒŽŽ› •–ƒ„‹Ž‹œ‡† ‡ƒ”–Š ȋȌ ™ƒŽŽ•ǡ †‡‡’ ˆ‘—†ƒ–‹‘ •›•–‡• ƒ† •‡––އ‡– ‘‹–‘”‹‰ ‘ˆ –Ї †‡‡’
ƒ›‘ ˆ‹ŽŽ•Ǥ ‡’‘”ƒ”› •Š‘”‹‰ •›•–‡•‹
‘„‹ƒ–‹‘ ™‹–Š  ™ƒŽŽ• ™‡”‡
‡˜ƒŽ—ƒ–‡†ƒ†
‘•–”—
–‡†
”‡ƒ–‹‰•‹‰‹ˆ‹
ƒ–Ž›‰”‡ƒ–‡”„—‹Ž†ƒ„އƒ”‡ƒˆ‘”–Ї†‡˜‡Ž‘’‡”Ǥ
x ”‘Œ‡
– ‰‹‡‡”Ȁƒƒ‰‡”ǡ ƒ—”‡Ž ”‡‡ ‘†‘‹‹—• ‡•‹†‡–‹ƒŽ ‡˜‡Ž‘’‡–ǡ ‹•–ƒǤ ‡”ˆ‘”‡† ƒ •—„•—”ˆƒ
‡ ‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ǡ ƒƒŽ›•‹• ƒ† ‰‡‘–‡
А‹
ƒŽ †‡•‹‰ ˆ‘” –Ї ’”‘’‘•‡† ”‡•‹†‡–‹ƒŽ
†‡˜‡Ž‘’‡– ƒ† ƒƒ‰‡† ‰”ƒ†‹‰ ƒ† ‰‡‘–‡
А‹
ƒŽ ‘„•‡”˜ƒ–‹‘ ƒ† –‡•–‹‰ ‘ˆ –Ї ”‡•‹†‡–‹ƒŽ
†‡˜‡Ž‘’‡–‹
Ž—†‹‰
‘•–”—
–‹‘‘ˆƒ’‡†‡•–”‹ƒ„”‹†‰‡ǡ‡
Šƒ‹
ƒŽŽ›•–ƒ„‹Ž‹œ‡†‡ƒ”–Š™ƒŽŽ•ǡ‰”‘—†
‹’”‘˜‡‡– ƒŽ‘‰ –Ї
”‡‡ǡ –‡’‘”ƒ”› „‡†”‘

—– •Ž‘’‡• ƒ† •‡––އ‡– ‘‹–‘”‹‰Ǥ
”‘—†
‹’”‘˜‡‡– •‘Ž—–‹‘• ™‡”‡ ‡˜ƒŽ—ƒ–‡† ƒ† ‹’އ‡–‡† –‘ ’‡”‹– ‘•–”—
–‹‘ ‘ˆ  ™ƒŽŽ• ‘˜‡”

‘’”‡••‹„އƒŽŽ—˜‹ƒŽ†‡’‘•‹–•†‹”‡
–Ž›ƒ†Œƒ
‡––‘ƒ’”‘–‡
–‡†Šƒ„‹–ƒ–Ǥ
x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ ‘›Ž‡ ˜‡—‡ ͳ͸Ǧ
”‡
†—•–”‹ƒŽ ‘’އšǡ ‡”‘Ǥ ”‘˜‹†‡† ’”‘Œ‡
–
ƒƒ‰‡‡– ƒ† ‡‰‹‡‡”‹‰ •—’’‘”– †—”‹‰ ‰”ƒ†‹‰ ƒ† ‘•–”—
–‹‘ ‘ˆ –Ї ‹†—•–”‹ƒŽ ™ƒ”‡Š‘—•‡

‘’އ𔇆‡˜‡Ž‘’‡–
‘•‹•–‹‰‘ˆ—•—‹–ƒ„އ—†‘
—‡–‡† ˆ‹ŽŽ”‡‘˜ƒŽƒ†”‡’Žƒ
‡‡– –‘†‡’–Š•
—’–‘ʹͷˆ‡‡–„‡Ž‘™‡š‹•–‹‰‰”ƒ†‡Ǥ‡‡’—†‘
—‡–‡†ˆ‹ŽŽ”‡‘˜ƒŽ•ǡ–‡’‘”ƒ”›„ƒ

—–•ƒ†•—„‰”ƒ†‡
•–ƒ„‹Ž‹œƒ–‹‘ –‡
А‹“—‡• ™‡”‡ ‘’–‹‹œ‡† ƒ† ‹’އ‡–‡† †—”‹‰ ‰”ƒ†‹‰ –‘ •Š‘”–‡ †—”ƒ–‹‘• ‘ –Ї

‘•–”—
–‹‘•
Ї†—އǤ
553

Page 22 ends

x ”‘Œ‡
– ‰‹‡‡”Ȁƒƒ‰‡”ǡ ”ƒ‰‡ ‘—–› ‹ƒŽ ƒ”‡ ƒ
‹Ž‹–›ǡ —•–‹Ǥ ‡”ˆ‘”‡† ƒ •—„•—”ˆƒ
‡
‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ ‹
Ž—†‹‰ ‡˜ƒŽ—ƒ–‹‘ ‘ˆ —†‘
—‡–‡† ˆ‹ŽŽ ™‹–Š‹ –Ї †‡
‘‹••‹‘‡† —•–‹
ƒ”‹‡ ƒ•‡ ƒ† ƒƒ‰‡† –Ї ‰‡‘–‡
А‹
ƒŽ ‘„•‡”˜ƒ–‹‘ ƒ† –‡•–‹‰ ƒ† •’‡
‹ƒŽ ‹•’‡
–‹‘ •‡”˜‹
‡•
†—”‹‰†‡•‹‰ƒ†
‘•–”—
–‹‘‘ˆ–Їƒ’’”‘š‹ƒ–‡Ž›ͳͲǦƒ
”‡”ƒ‰‡‘—–›‹ƒŽƒ”‡ ƒ
‹Ž‹–›’”‘Œ‡
–Ǥ
x ”‘Œ‡
– ‰‹‡‡”ǡ ͻǦ
”‡ ‡•‹†‡–‹ƒŽ ‡˜‡Ž‘’‡–ǡ Žƒ
‡–‹ƒǤ ‡”ˆ‘”‡† ƒ •—„•—”ˆƒ
‡ ‰‡‘–‡
А‹
ƒŽ
‡˜ƒŽ—ƒ–‹‘‘ˆ–Ї‡š‹•–‹‰—†‘
—‡–‡†ˆ‹ŽŽƒ†’”‘˜‹†‡†‰‡‘–‡
А‹
ƒŽ”‡
‘‡†ƒ–‹‘•ˆ‘”‹–‹‰ƒ–‹‘
‘ˆ–Ї—†‘
—‡–‡†ˆ‹ŽŽ‹
Ž—†‹‰”‡‘˜ƒŽƒ†”‡
‘’ƒ
–‹‘ƒ†‰”‘—†‹’”‘˜‡‡–Ǥ
x ”‘Œ‡
– ƒƒ‰‡”Ȁ‰‹‡‡”ǡ
†‹ƒ –”‡‡–
†—•–”‹ƒŽ ‡˜‡Ž‘’‡–ǡ ‘”‡‘ ƒŽŽ‡›Ǥ ”‘˜‹†‡† ’”‘Œ‡ –
ƒƒ‰‡‡–ƒ†‡‰‹‡‡”‹‰•—’’‘”–†—”‹‰‰”ƒ†‹‰ƒ†
‘•–”—
–‹‘‘ˆ‹†—•–”‹ƒŽ™ƒ”‡Š‘—•‡„—‹Ž†‹‰
™‹–ŠŽ‘
ƒŽ‹œ‡†ƒ”‡ƒ•‘ˆ†‡‡’—•—‹–ƒ„އ•‘‹Ž”‡‘˜ƒŽƒ†”‡
‘’ƒ
–‹‘Ǥ
x ”‘Œ‡
–‰‹‡‡”ǡ ‘™ ƒ’‘—–Ї”Ž›”‹†‰‡‡‰‡–ǡƒ
Š‘‹••‹‘‹‡Œ‘Ǥ‡”ˆ‘”‡†ƒ •—„•—”ˆƒ
‡
‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ǡ ƒƒŽ›•‹• ƒ† †‡•‹‰ ˆ‘” –Ї ƒ’’”‘š‹ƒ–‡Ž› ͳǡͶͲͲ ˆ– Ž‘‰ ‘—–Ї”Ž› ‘™ ƒ’ ”‹˜‡„”‹†‰‡†‡‡’ˆ‘—†ƒ–‹‘•›•–‡•’ƒ‹‰Š‹“—‹–ƒƒ›‘Ǥ x ”‘Œ‡
–ƒƒ‰‡”Ȁ‰‹‡‡”ǡ ‹‹•–‡””ƒ—’–ƒ–‹‘ǡ‹••‹‘‹‡Œ‘Ǥ‡”ˆ‘”‡†ƒ•—„•—”ˆƒ ‡‰‡‘–‡
А‹
ƒŽ
‡˜ƒŽ—ƒ–‹‘ƒ†ƒƒ‰‡†–Ї‰‡‘–‡
А‹
ƒŽ‘„•‡”˜ƒ–‹‘ƒ†–‡•–‹‰ƒ†•’‡
‹ƒŽ‹•’‡
–‹‘•‡”˜‹
‡•†—”‹‰
†‡•‹‰ƒ†
‘•–”—
–‹‘‘ˆƒ‡‹••‹‘‹‡Œ‘ǯ•ˆ‹”•–ƒ†˜ƒ
‡†’—”‹ˆ‹‡†™ƒ–‡”–”‡ƒ–‡–•›•–‡Ǥ
x ”‘Œ‡
– ‰‹‡‡”ǡ ‹–› ‘ˆ Ž‹•‘ ‹‡Œ‘ ƒ‹”› ‘”‡–Žƒ† ”‘Œ‡ –Ǥ ‡”ˆ‘”‡† ƒ •—„•—”ˆƒ
‡ ‰‡‘–‡
А‹
ƒŽ
‡˜ƒŽ—ƒ–‹‘ǡƒƒŽ›•‹•ƒ†ƒƒ‰‡†‰‡‘–‡
А‹
ƒŽ
‘•–”—
–‹‘•‡”˜‹
‡• ˆ‘” –Ї‹–›ǯ•™‡–Žƒ†’”‘Œ‡
–ǤЇ
’”‘Œ‡
–
‘•‹•–‡†‘ˆ‰”ƒ†‹‰ƒ†
‘•–”—
–‹‰ –™‘™‡–Žƒ†’‘†•‡ƒ
Šƒ’’”‘š‹ƒ–‡Ž›ͺ –‘ͳʹ ˆ‡‡–†‡‡’
–‘–ƒŽ‹‰ƒ’’”‘š‹ƒ–‡Ž›ʹ͸ǡͲͲͲ•“—ƒ”‡ˆ‡‡–Ǥ
x ”‘Œ‡
–‰‹‡‡”ǡ”ƒ„—
‘ƒ›‘ƒ–‡”‹•–”‹
–ƒ™ƒ–‡””ƒ•‹••‹‘‹‡ǡƒ‡ ‘”‡•–Ǥ‡”ˆ‘”‡†ƒ ‰‡‘–‡
А‹
ƒŽ •—„•—”ˆƒ
‡ ‡˜ƒŽ—ƒ–‹‘ǡ ƒƒŽ›•‹• ƒ† ‰‡‘–‡
А‹
ƒŽ †‡•‹‰ ˆ‘” –Ї ͳ͸Ǧ‹
Š  ’‹’‡Ž‹‡
ƒŽ‹‰‡–•’ƒ‹‰ƒ’’”‘š‹ƒ–‡Ž›ͶǡͷͲͲŽ‹‡ƒ”ˆ‡‡–Ǥ
x ”‘Œ‡
–‰‹‡‡”ǡ‹–›‘ˆƒއ‡–‡–‘””ƒ‹
’”‘˜‡‡–ǡ‹ƒƒ•
ƒ†‹–ƒǤ‡”ˆ‘”‡†ƒ•—„•—”ˆƒ
‡
‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ǡ ƒƒŽ›•‹• ƒ† †‡•‹‰ ˆ‘” –Ї ’”‘’‘•‡† ͳͺ –‘ ͵͸Ǧ‹ Š ‡‹ˆ‘”
‡† ‘
”‡–‡ ‹’‡
•–‘”†”ƒ‹•’ƒ‹‰ƒ’’”‘š‹ƒ–‡Ž›ͳǡʹͲͲŽ‹‡ƒ”ˆ‡‡–Ǥ

PROFESSIONAL HISTORY
ƒ›ʹͲͳ͹Ǧ”‡•‡–ǣ ‹
‡”‡•‹†‡–‘ˆ‰‹‡‡”‹‰ǡ

‡‘–‡
А‹
ƒŽǡ

Ǥǡƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒ
ʹͲͳͳǦƒ›ʹͲͳ͹ǣ ”‘Œ‡
–‰‹‡‡”ǡ‡‹‘”–ƒˆˆ‰‹‡‡”ǡ–ƒˆˆ‰‹‡‡”ǡ

‡‘–‡
А‹
ƒŽǡ

Ǥǡƒ
Š‘
ƒ–ƒƒ”‰ƒ”‹–ƒǡƒŽ‹ˆ‘”‹ƒ

PUBLICATION
x ‘—‰Žƒ•ǡǤǤǡ‹™ƒ”‹ǡǤǤǡʹͲͳͶǡDz’’Ž‹
ƒ–‹‘‘ˆ

‘‘Ž•ˆ‘”Š”‡‡Ǧ‹‡•‹‘ƒŽŽ‘’‡–ƒ„‹Ž‹–›ƒŽ›•‹• ‘ˆ”‡Ǧš‹•–‹‰ƒ†•Ž‹†‡•dzǡǤ
ǤЇ•‹•Ǥ
554

Page 23 ends

Related Experience
Їˆ‘ŽŽ‘™‹‰‹•ƒŽ‹•–‘ˆ‹†‹˜‹†—ƒŽ•™‹–ЙБ

‡‘–‡
А‹
ƒŽŠƒ•Šƒ†އ‰–Š›•—

‡••ˆ—Ž™‘”‹‰
”‡Žƒ–‹‘•Š‹’•ǡ ‹ ƒ ”‘އ •‹‹Žƒ” –‘ ™Š‹
Š ™‡ ™‘—ކ •‡”˜‡ ›‘—Ǥ Ї ”‡ˆ‡”‡
‡• Šƒ˜‡ „‡‡ ‘”‰ƒ‹œ‡†
ƒ

‘”†‹‰ –‘ ‰‡‘–‡
А‹
ƒŽ •‡”˜‹
‡• ’”‘˜‹†‡† ˆ‘” ’Žƒ
Ї
 ƒ† ‰‡‘–‡
А‹
ƒŽ •‡”˜‹
‡• ˆ‘” ‹–›
ƒ†‹‹•–‡”‡† †‡˜‡Ž‘’‡–•Ǥ ”Ǥ ‘Ž•‘ǡ ”Ǥ ‘”ƒ–›‡  ƒ† ”Ǥ ƒ™•‘ Šƒ˜‡ ‡‹–Ї” ™‘”‡†
‹†‹˜‹†—ƒŽŽ›‘”Œ‘‹–Ž›‘–Ї’”‘Œ‡
–•Ž‹•–‡†„‡Ž‘™Ǥ
References for Plan Check:

City of San Clemente
”Ǥ
ƒ‘•‡ǡ••‹•–ƒ–‹–›‰‹‡‡”
ͻͳͲƒŽŽ‡‡‰‘
‹‘ǡ—‹–‡ͳͲͲ
ƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒͻʹ͸͹͵
ˆˆ‹
‡ǣȋͻͶͻȌ͵͸ͳǦ͸ͳ͵ͷ
Geotechnical Services Provided: Plan Review Services
—” ’‡”•‘‡Ž Šƒ˜‡ ™‘”‡† ™‹–Š ”Ǥ ‘•‡ ˆ‘” ‘˜‡” ͳͷ ›‡ƒ”•Ǥ —”‹‰ –Š‹• –‹‡ǡ ™‡ Šƒ˜‡ ’”‘˜‹†‡†‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™‘˜ƒ”‹‘—•’”‹˜ƒ–‡†‡˜‡Ž‘’‡–•ƒ†‹–›ƒ†‹‹•–‡”‡†’”‘Œ‡ –•Ǥ
˜‡” ƒ ƒ’’”‘š‹ƒ–‡Ž› •‡˜‡Ǧ›‡ƒ” ’‡”‹‘†ǡ 

‡‘–‡
А‹
ƒŽ Šƒ• ’‡”ˆ‘”‡† —‡”‘—• ”‡’‘”–
”‡˜‹‡™•ƒ†ƒ––‡†‡†•‡˜‡”ƒŽ‡‡–‹‰•”‡‰ƒ”†‹‰–Ї’”‘’‘•‡†•–ƒ„‹Ž‹œƒ–‹‘‘ˆƒŽƒ”‰‡Žƒ†•Ž‹†‡ ‘ –Ї ™‡•– •‹†‡ ‘ˆ ˜‡‹†ƒ ‘Ž—„‘ǡ ”‡•—Ž–‹‰ ‹ ‡Ž‡˜‡ –Š‹”†Ǧ’ƒ”–› ”‡˜‹‡™ ”‡’‘”–•Ǥ ‹–Š ƒ •‘‡–‹‡•Ǧ
‘„ƒ–‹˜‡ ƒ’’Ž‹
ƒ– ƒ† އ•• –Šƒ •–ƒ†ƒ”† ‘ˆ
ƒ”‡ ‰‡‘–‡
А‹
ƒŽ •—„‹––ƒŽ•ǡ 


‡‘–‡
А‹
ƒŽ Їޒ‡† –Ї ‹–› ‡‡– ‹–• ‘„Ž‹‰ƒ–‹‘ –‘ Бކ –Ї •—„‹––ƒŽ• –‘ –Ї ‰‡‘–‡ А‹
ƒŽ
•–ƒ†ƒ”†‘ˆ
ƒ”‡™Š‹Ž‡ƒ‹‰‡˜‡”›‡ˆˆ‘”– –‘ƒ••‹•– –Їƒ’’Ž‹
ƒ–ƒ† –Ї‹”
‘•—Ž–ƒ– –‘‡‡–
•ƒ‹†•–ƒ†ƒ”†Ǥ
‡ Šƒ˜‡ ’”‘˜‹†‡† ”‡˜‹‡™ •‡”˜‹
‡• ˆ‘” ‡ƒ ‘‹–‡ •–ƒ–‡•ǡ ˆ‘” ƒ ’”‘’‘•‡† ”‡
‘•–”—
–‹‘ ‘ˆ ƒ
”‡•‹†‡–‹ƒŽƒ”‡ƒ–Šƒ–™ƒ•’ƒ”–‹ƒŽŽ›†‡‘Ž‹•Ї†™Š‡ƒƒŒ‘”Žƒ†•Ž‹†‡”‡ƒ –‹˜ƒ–‡†ƒ†‹’ƒ
–‡†
‹–› ‹’”‘˜‡‡–• ƒ† ’”‹˜ƒ–‡ †‡˜‡Ž‘’‡–Ǥ ††‹–‹‘ƒŽŽ›ǡ  
‡‘–‡
А‹
ƒŽ Šƒ• ’”‘˜‹†‡†
”‡˜‹‡™‘„‡ŠƒŽˆ‘ˆ–Ї
‹–›‘ˆƒއ‡–‡ ˆ‘”’”‹˜ƒ–‡”‡•‹†‡–‹ƒŽ†‡˜‡Ž‘’‡–•‹‡ƒ‘‹–‡ •–ƒ–‡•ǡ†‹•–”‡••–‘‡š‹•–‹‰‹–›‘™‡†ƒ†ƒ‹–ƒ‹‡†™ƒ–‡””‡•‡”˜‘‹”•ƒ†”‡˜‹‡™‘ˆƒ‰Ž‘„ƒŽ •Ž‘’‡•–ƒ„‹Ž‹–›‡˜ƒŽ—ƒ–‹‘‘ˆƒ‹‘‡‘•ƒ”‡•ƒ† ˜ƒ”‹‘—•‘–Ї”’”‘Œ‡ –•Ǥ‡‡•–‹ƒ–‡ –Ї
–‘–ƒŽ˜ƒŽ—‡‘ˆ–Ї•‡’”‘Œ‡
–•ƒ–̈́ͷͲ‹ŽŽ‹‘Ǥ‡”˜‹
‡•™‡”‡’”‘˜‹†‡†ˆ”‘ʹͲͳͲ–Š”‘—‰Š’”‡•‡–Ǥ
—”•‡”˜‹
‡•™‡”‡’”‘˜‹†‡†‘–‹‡ƒ†™‹–Š‹„—†‰‡–
City of San Juan Capistrano
•Ǥƒ–ƒŽ‹ƒŠƒ˜‡œǡ••‹•–ƒ–‰‹‡‡”
”Ǥ
—•–‹
†—
‹Žǡ••‹•–ƒ–‰‹‡‡”
͵ʹͶͲͲƒ•‡‘†‡Žƒ–‘
ƒ
—ƒƒ’‹•–”ƒ‘ƒŽ‹ˆ‘”‹ƒͻʹ͸͹ͷ
ˆˆ‹
‡ǣȋͻͶͻȌͶͺ͹ǦͶ͵ͳ͵
555

Page 24 ends

Geotechnical Services Provided: Plan Review Services
—”’‡”•‘‡ŽŠƒ˜‡™‘”‡†™‹–Š–Ї‹–›‘ˆƒ
—ƒƒ’‹•–”ƒ‘ˆ‘”‘˜‡”ͳͷ›‡ƒ”•Ǥ˜‡”–ЇŽƒ•–
ͷ ›‡ƒ”• ™‡ Šƒ˜‡ ’”‘˜‹†‡† ‰‡‘–‡
А‹
ƒŽ ”‡˜‹‡™ ‘ ‘˜‡” ͵Ͳ ’”‘Œ‡
–•Ǥ Š‹• ‹
Ž—†‡• ’Žƒ
Ї

™‘” ‘ ƒ
‹ˆ‹
 ‘‹–ǡ ƒ ‰‡‘–‡
А‹
ƒŽ
ŠƒŽŽ‡‰‹‰ ƒ•–‡” ’Žƒ‡†
‘—‹–› ‹ ƒ
—ƒ
ƒ’‹•–”ƒ‘Ǥ 

‡‘–‡
А‹
ƒŽ ’”‘˜‹†‡† ‰‡‘–‡
А‹
ƒŽ ’Žƒ
Ї
 ‘ˆ ”‡’‘”–• ’”‡’ƒ”‡† „› ‘–Ї”
‰‡‘–‡
А‹
ƒŽ
‘•—Ž–ƒ–•ǡ
‘ˆ‘”ƒ–‹‘ƒŽ ‰‡‘Ž‘‰‹
 ƒ’’‹‰ ƒ†
‘’ƒ
–‹‘ –‡•–‹‰ •‡”˜‹
‡•
†—”‹‰ †‡˜‡Ž‘’‡– ‘ˆ ƒ
‹ˆ‹
 ‘‹–Ǥ 

‡‘–‡
А‹
ƒŽ
—””‡–Ž› ’”‘˜‹†‡• ‘Ǧ
ƒŽŽ ’Žƒ
Ї

•‡”˜‹
‡• ˆ‘” ’”‹˜ƒ–‡ †‡˜‡Ž‘’‡–• ™‹–Š ƒ
—ƒ ƒ’‹•–”ƒ‘Ǥ 

‡‘–‡
А‹
ƒŽ Šƒ• ”‡˜‹‡™‡†
‡˜‡”›–Š‹‰ ˆ”‘”‡•‹†‡–‹ƒŽ”‡‘†‡Ž•ǡ‡™”‡•‹†‡–‹ƒŽ ‘•–”—
–‹‘ǡ
‘‡”
‹ƒŽ’”‘Œ‡
–•ǡ’‘‘Ž•
ƒ† •’ƒ•ǡ ”‡ƒ”Ǧ›ƒ”† †‡
•ǡ ’”‘’‘•‡† ”‡–ƒ‹‹‰ ™ƒŽŽ• ƒ† •Ž‘’‡ ”‡’ƒ‹”•Ǥ ‡ ‡•–‹ƒ–‡ –Ї –‘–ƒŽ ˜ƒŽ—‡ ‘ˆ –Ї•‡ ’”‘Œ‡
–• ƒ– ƒ’’”‘š‹ƒ–‡Ž› ̈́͵Ͳ ‹ŽŽ‹‘Ǥ ‡”˜‹
‡• Šƒ˜‡ „‡‡ ’”‘˜‹†‡† ˆ”‘ ʹͲͳͲ
–Š”‘—‰Š’”‡•‡–Ǥ—”•‡”˜‹
‡•™‡”‡’”‘˜‹†‡†‘–‹‡ƒ†™‹–Š‹„—†‰‡–Ǥ
References for City Administered Development:

City of San Clemente
”Ǥƒ˜‡‡„‡•†‘”ˆǡ—„Ž‹
‘”•‹”‡
–‘”
ͻͳͲƒŽŽ‡‡‰‘
‹‘ǡ—‹–‡ͳͲͲ
ƒއ‡–‡ǡƒŽ‹ˆ‘”‹ƒͻʹ͸͹͵
ˆˆ‹
‡ǣȋͻͶͻȌ͵͸ͳǦ͸ͳ͵Ͳ
Geotechnical Services Provided: Consulting on Various City of San Clemente Improvements
˜‡”–ЇŽƒ•–ͳͷ›‡ƒ”•ǡ‘—”’‡”•‘‡ŽŠƒ˜‡’”‘˜‹†‡†‰‡‘–‡ А‹
ƒŽ†‡•‹‰•‡”˜‹
‡•ˆ‘”˜ƒ”‹‘—•‹–›
‘ˆ ƒ އ‡–‡ ’”‘Œ‡
–•Ǥ Ї•‡ ‹
Ž—†‡ǣ ‰‡‘–‡
А‹
ƒŽ ‡˜ƒŽ—ƒ–‹‘ ‘ˆ –Ї ƒ•ƒ ‘ƒ–‹
ƒ •Ž‘’‡
ˆƒ‹Ž—”‡ǡ ’”‘˜‹•‹‘ ‘ˆ ”‡
‘‡†ƒ–‹‘• ƒ† ”‡’‘”– ˆ‘” †‡•‹‰ ƒ† ”‡’ƒ‹” ‘ˆ –Ї •Ž‘’‡ ˆƒ‹Ž—”‡ ‹–‹‰ƒ–‹‘ǡ ƒ† ‘Ǧ‰‘‹‰ ‘„•‡”˜ƒ–‹‘ ƒ† –‡•–‹‰ †—”‹‰ ‹–‹‰ƒ–‹‘ ‘•–”—
–‹‘ǣ –Š‹”†Ǧ’ƒ”–›
‰‡‘–‡
А‹
ƒŽ ”‡˜‹‡™ ˆ‘” –Ї ‹†ƒ ƒ‡ •Ž‘’‡ ˆƒ‹Ž—”‡Ǣ ‹‘” ‰”ƒ†‹‰ǡ —–‹Ž‹–› ƒ† Ž‹‰Š– ’‘އ ‹’”‘˜‡‡–•ƒ–ƒ
‘”‰‘‹‘ƒ†–‡‡†ƒ”•ǡ
ƒ‹••‘•—’’‘”–ˆ‘”‘Ž—„‘˜‡—‡•‡™‡”Ž‹ˆ–
•–ƒ–‹‘ǡ
‘’ƒ
–‹‘ –‡•–‹‰†—”‹‰„ƒ
ˆ‹ŽŽ‹‰‘ˆƒ™ƒ–‡”Ž‹‡ƒ–ƒ‹‘‡”ƒ”—œƒ†˜‡‹†ƒ ‹•–ƒ
‡”‘•ƒǡ•—„•—”ˆƒ
‡‰‡‘–‡
А‹
ƒŽ‡˜ƒŽ—ƒ–‹‘ƒ††‡•‹‰”‡
‘‡†ƒ–‹‘•ˆ‘”–Ї‡™ƒ
ƒ„Ž‘’”‡••—”‡”‡†—
‹‰•–ƒ–‹‘ǡ
‘’ƒ
–‹‘ƒ†–‡•–‹‰†—”‹‰‡Žƒ„‘™ƒ–‡”Ž‹‡”‡’Žƒ
‡‡–ǡ
•–”‡‡– ‹’”‘˜‡‡–• ȋ
—”„ ƒ† ‰—––‡”ǡ ƒ•’ŠƒŽ– ƒ† ™‡– —–‹Ž‹–‹‡•Ȍ ƒ– ‹ƒ ‡ŽŽ‘–ƒǡ •—„•—”ˆƒ ‡
ƒ••‡••‡– ƒ† ƒƒŽ›•‹• ˆ‘” –Ї Žƒ†•Ž‹†‡ ƒ†Œƒ
‡– –‘ ‡•‡”˜‘‹” —„‡” ͻǡ ‰‡‘–‡
А‹
ƒŽ
‘„•‡”˜ƒ–‹‘ ‘ˆ
ƒ‹•••‘ †”‹ŽŽ‹‰ǡ
‘
”‡–‡ –‡•–‹‰ ƒ† †‡’—–›‹•’‡
–‘” ˆ‘”™‡Ž†‹‰ ƒ– –Ї —‡Ž

•Žƒ† ‘˜‡” ƒ– –Ї ”‡ƒ–‡‡– Žƒ– ‘ ˜‡†‹ƒ ‹ ‘Ǥ ‡ ‡•–‹ƒ–‡ –Ї –‘–ƒŽ ˜ƒŽ—‡ ‘ˆ –Ї•‡
’”‘Œ‡
–•ƒ– ̈́ͳͲ‹ŽŽ‹‘Ǥ‡”˜‹
‡•™‡”‡’”‘˜‹†‡† ˆ”‘ʹͲͳͲ –Š”‘—‰Š’”‡•‡–Ǥ—” •‡”˜‹ ‡•™‡”‡
’”‘˜‹†‡†‘–‹‡ƒ†™‹–Š‹„—†‰‡–Ǥ
Sample Plan Review Correction Lists & Forms
šƒ’Ž‡ ”‡˜‹‡™ •Ї‡–• ˆ”‘ ‰‡‘–‡
А‹
ƒŽ –Š‹”†Ǧ’ƒ”–› ”‡˜‹‡™ ’‡”ˆ‘”‡† „› 

‡‘–‡
А‹
ƒŽ ƒ”‡
ƒ––ƒ
Ї†–‘–Š‹•’”‘’‘•ƒŽȋ”‡ƒ”‘ˆ–‡š–ȌǤ
556

Page 25 ends

Project Schedule


‡‘–‡
А‹
ƒŽǯ•”‡˜‹‡™•™‹ŽŽ„‡‘”‡–‹‡Ž›–Šƒ–Ї‹–›ǯ•‹‹—”‡“—‹”‡†–—”ƒ”‘—†–‹‡ˆ”ƒ‡• ‘ˆ ͳʹ ™‘”‹‰ †ƒ›• ‘” އ•• ˆ‘” ƒ ˆ‹”•– ”‡˜‹‡™ ƒ† ͹ ™‘”‹‰ †ƒ›• ‘” އ•• ˆ‘” ƒ •‡ ‘† ƒ† •—„•‡“—‡–
”‡˜‹‡™•Ǥ ‡ —†‡”•–ƒ† –Šƒ– –Ї ‹–› —•– ƒŽ•‘ Šƒ˜‡ –‹‡ –‘ ”‡˜‹‡™ ƒ† †‹• —•• ‘—” ”‡˜‹‡™• ’”‹‘” –‘
’”‘
‡••‹‰ƒ†ˆ‘”™ƒ”†‹‰–‘–Їƒ’’Ž‹
ƒ–Ǥ
•™‡Šƒ˜‡’”‡˜‹‘—•Ž›†‡‘•–”ƒ–‡†–‘–Ї‹–›‘ˆƒއ‡–‡ƒ†™‹–Š‘–Ї”Ž‘ ƒŽ—‹
‹’ƒŽ‹–‹‡•ǡ


‡‘–‡
А‹
ƒŽ‹•’”‡’ƒ”‡†–‘—–‹Ž‹œ‡–ЇˆŽ‡š‹„‹Ž‹–›‘ˆ‘—”•–ƒˆˆ–‘‹–•ˆ—ŽŽ‡•–‡š–‡–‹‘”†‡”–‘‡‡–›‘—”Dzƒ•Ǧ ‡‡†‡†ǡdzDz‘Ǧ
ƒŽŽdzƒ†Dz•Š‘”–‘–‹
‡dz”‡“—‡•–•Ǥ
Cost Data
’‡
‹ˆ‹

‘•–‡•–‹ƒ–‡•™‹ŽŽ„‡’”‘˜‹†‡†‘ƒ’”‘Œ‡
–Ǧ„›Ǧ’”‘Œ‡
–„ƒ•‹•„ƒ•‡†‘ –Ї†‘
—‡–•’”‘˜‹†‡† ˆ‘”
”‡˜‹‡™Ǥ• ƒ ‰—‹†‡Ž‹‡ǡ‹ ‘—” ‡š’‡”‹‡
‡ –Ї
‘’އ–‡ ”‡˜‹‡™ ’”‘
‡•• ˆ‘” ƒ •—„‹––ƒŽ ˆ‘” ƒ –›’‹
ƒŽ •‹‰Ž‡Ǧ
ˆƒ‹Ž›”‡•‹†‡
‡ ȋ͵”‡˜‹‡™•Ȍ™‹ŽŽ
‘•–ƒ„‘—–̈́ͳǡͺͲͲǤƒ”‰‡”ƒ†‘”‡
‘’Ž‹
ƒ–‡†’”‘Œ‡
–•ƒ›
‘•–‘”‡Ǥ
Ž–‹ƒ–‡Ž› ‘—” •‡”˜‹
‡• ™‹ŽŽ „‡ ’”‘˜‹†‡† ‘ ƒ –‹‡ ƒ† ƒ–‡”‹ƒŽ• „ƒ•‹• ‹ ƒ

‘”†ƒ
‡ ™‹–Š ‘—” ʹͲʹͶ
”‘ˆ‡••‹‘ƒŽ ‡‡
Ї†—އȋƒ––ƒ
Ї†‹•‡’ƒ”ƒ–‡‡˜‡Ž‘’‡Ȍ„›–Ї‡›’‡”•‘‡ŽŽ‹•–‡†Ї”‡‹ƒ†‘—”•—’’‘”– •–ƒˆˆǤ
Statement of Compliance
Š‹• ’”‘’‘•ƒŽ ‹• ‹ •–”‹
–
‘’Ž‹ƒ
‡ ™‹–Š –Ї ‡“—‡•– ˆ‘” ”‘’‘•ƒŽ ƒ† –Ї †”ƒˆ– ”‘ˆ‡••‹‘ƒŽ ‡”˜‹ ‡•
‰”‡‡‡–ǡ‘‡š
‡’–‹‘•–‘‡‹–Ї”ƒ”‡’”‘’‘•‡†Ǥ
Local Experience Matters


‡‘–‡
А‹
ƒŽ‹•—‹“—‡Ž›“—ƒŽ‹ˆ‹‡† –‘’”‘˜‹†‡‘Ǧ
ƒŽŽ‰‡‘–‡
А‹
ƒŽ”‡˜‹‡™•‡”˜‹
‡• ˆ‘” –Ї‹–› ‘ˆƒ
އ‡–‡Ǥ ‡ ƒ”‡ –Ї Žƒ”‰‡•– ‰‡‘–‡
А‹
ƒŽ
‘•—Ž–‹‰ ˆ‹” ‹ –‘™ ƒ† ‘—” ‡’Ž‘›‡‡• Šƒ˜‡ ‘”‡ ‡š’‡”‹‡
‡ –Šƒ ‘–Ї” Ž‘
ƒŽ
‘•—Ž–ƒ–• ‹ ‡˜ƒŽ—ƒ–‹‰ –Ї ‰‡‘–‡
А‹
ƒŽ
‘†‹–‹‘• ‹ ƒ އ‡–‡ǡ ˆ”‘
‹˜‡•–‹‰ƒ–‹‘ –Š”‘—‰Š
‘•–”—
–‹‘ǤŠ‹•‘™Ž‡†‰‡ƒ†‡š’‡”‹‡
‡‹•
”‹–‹
ƒŽ –‘‡•—”‡‘–Ї”
‘•—Ž–ƒ–•
™‘”‹‰‘’”‘Œ‡
–•‹–Ї‹–›—†‡”•–ƒ†ƒ†ƒ’’”‘’”‹ƒ–‡Ž›ƒ††”‡••–Ї‰‡‘–‡ А‹
ƒŽ
‘•–”ƒ‹–•–Šƒ––Ї
Ž‘
ƒŽ
‘†‹–‹‘•ƒ›’‘•‡–‘ƒ’”‘Œ‡
–Ǥ


‡‘–‡
А‹
ƒŽǯ•Ž‘
ƒŽ‡š’‡”–‹•‡•Š‘—ކ„‡—•‡†ƒ•ƒƒ••‡––‘–Ї‹–›Ǥ‡ƒ”‡‡š’‡”‹‡ ‡†‹‡˜ƒŽ—ƒ–‹‘
ƒ† ƒ††”‡••‹‰ –Ї ‘ކ‡”ǡ ‘˜‡”Ǧ•–‡‡’‡‡† ˆ‹ŽŽ •Ž‘’‡• ‹ –Ї •‘—–Ї” ’‘”–‹‘ ‘ˆ ƒ އ‡–‡ ™Š‹ Š ƒ”‡
’”‘‡ –‘ •‡––އ‡–ǡ •Ž‘’‡
”‡‡’ǡ •Ž‘’‡ ˆƒ‹Ž—”‡ǡ ƒ† ƒ”‡ ‘ˆ–‡ —†‡”Žƒ‹ „› ‘’”‡••‹„އ •‘‹Ž•Ǥ ‡
—†‡”•–ƒ† –Ї †‹ˆˆ‹
—Ž–‹‡• ‘ˆ ƒ††”‡••‹‰ •Ž‘’‡ •–ƒ„‹Ž‹–›‹••—‡•ƒŽ‘‰ –Ї ‘ƒ•–ƒŽ „Ž—ˆˆƒ†
ƒ›‘•ǡ™Š‹Ž‡
ƒŽ•‘ ‡‡–‹‰ –Ї ”‡“—‹”‡‡–• ‘ˆ –Ї ‹–› ƒ† ƒŽ‹ˆ‘”‹ƒ ‘ƒ•–ƒŽ ‘‹••‹‘Ǥ ‡ Šƒ˜‡ •—

‡••ˆ—ŽŽ›
•–ƒ„‹Ž‹œ‡†•‘‡‘ˆ–ЇŽƒ”‰‡•–ƒ†‘•–
‘’Ž‹
ƒ–‡†Žƒ†•Ž‹†‡•‹–‘™ƒ•™‡ŽŽƒ••‘‡‘ˆ–Ї•ƒŽŽ‡•–Ǥ‡ Šƒ˜‡ƒŽ•‘’”‘˜‹†‡†–Š‹”†’ƒ”–›”‡˜‹‡™•‡”˜‹
‡•ƒ†
‘•—Ž–‹‰ˆ‘”–Ї‹–›ƒ†ƒ†Œƒ
‡–
‹–‹‡•ǡˆ‘”Žƒ†•Ž‹†‡
ƒ† •Ž‘’‡ •–ƒ„‹Ž‹œƒ–‹‘ ’”‘Œ‡
–• „› –Ї ‘–Ї”
‘•—Ž–ƒ–•Ǥ‡ƒ”‡ ˆƒ‹Ž‹ƒ”™‹–Šƒ† —†‡”•–ƒ† –Ї •Ž‘’‡

”‡‡’ƒ†Ž‘–•–”‡–
Š‹‰’Ї‘‡ƒ –Šƒ– ‘

—”•„‘–Š‹ ‘ކ‡”ƒއ‡–‡ƒ•™‡ŽŽƒ•‹ƒŽ‡‰ƒǤ‡ƒ”‡ ‡š’‡”‹‡
‡† ™‹–Š ”‡
‘‡†ƒ–‹‘• ˆ‘” ‹–‹‰ƒ–‹‘ ƒ‰ƒ‹•– ‹••—‡• ”‡Žƒ–‡† –‘ –Ї Ž‘ ƒŽ ‡š’ƒ•‹˜‡ ƒ†

‘””‘•‹˜‡•‘‹Ž
‘†‹–‹‘•Ǥ
557

Page 26 ends

‹–Š ‘—” ‡š–‡•‹˜‡ Ž‘
ƒŽ ‡š’‡”‹‡
‡ ƒ† ‘™ǦŠ‘™ǡ ™‡
ƒ ‰—‹†‡ ƒ† ‡†—
ƒ–‡
‘•—Ž–ƒ–• އ••
‡š’‡”‹‡
‡†‹ –Їƒ”‡ƒ ‘Š‘™ –‘ƒ’’”‘’”‹ƒ–‡Ž›ƒ††”‡•• –ЇŽ‘ ƒŽ •‹–‡
‘†‹–‹‘•Ǥ 

‡‘–‡
А‹
ƒŽ
™‹ŽŽ”‡’”‡•‡––Ї‹–›ǯ•„‡•–‹–‡”‡•––‘‡•—”‡–Šƒ–‡˜‡”›‡ˆˆ‘”–‹•ƒ†‡‡•—”‡ƒ‰‘‘†’”‘†— –ˆ”‘
‘–Ї”‰‡‘–‡
А‹
ƒŽ
‘•—Ž–ƒ–•™‘”‹‰‹–Ї‹–›Ǥ
NonǦDiscrimination


‡‘–‡
А‹
ƒŽƒ‰”‡‡• –Šƒ–‹
ƒ””›‹‰ ‘—– ‘—” ”‡•’‘•‹„‹Ž‹–‹‡• —†‡” –Š‹•ƒ‰”‡‡‡–ǡƒ†‹ ’ƒ”–‹
—Žƒ” ™‹–Š ”‡‰ƒ”† –‘ –Ї ‡’Ž‘›‡– ‘ˆ ’‡”•‘• ƒ† •—„Ǧ ‘–”ƒ
–‘”• ™‘”‹‰ ‘ –Ї
’”‘Œ‡
–ǡ™‡™‹ŽŽ‘–†‹•
”‹‹ƒ–‡‘–Ї„ƒ•‹•‘ˆ”ƒ
‡ǡ
‘Ž‘”ǡ
”‡‡†ǡƒ–‹‘ƒŽ‘”‹‰‹ǡ”‡Ž‹‰‹‘ǡ•‡šǡ
ƒ‰‡‘”Šƒ†‹
ƒ’Ǥ
558

Page 27 ends

Sample Plan Review Correction
Lists & Forms
559
131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com October 19, 2018 Project No. 10113-01
Mr. Zak Ponsen
City of San Clemente
910 Calle Negocio, Ste. 100
San Clemente, California 92673
Subject: Third-Party Geotechnical Review, Updated Geotechnical Evaluation, Slope Repair, 715, 717, and 719 Avenida Columbo, of Tract 898, San Clemente, California Introduction
In accordance with your request, LGC Geotechnical has geotechnically reviewed the provided geotechnical response report (Nicoll, 2018e) to third-party geotechnical review comments regarding the proposed landslide repair west of 715, 717, and 719 Avenida Columbo of Tract 898, San Clemente, California (LGC Geotechnical, 2018c). Our review comments are based on the referenced documents and are in the context of our knowledge of the site and our experience in the vicinity of the site and with projects with similar geotechnical conditions.

Action
Geotechnical Report Recommended for Approval.

Geotechnical Report Recommended for Approval with the Following Conditions.

Geotechnical Report NOT Recommended for Approval and Requires Revisions and/or Additional Information. Please See Comments/Questions on the Following Page(s).

General Comment
It is and has been our opinion, that the model presented would be well served with additional subsurface evaluation and laboratory testing of the site materials to confirm the site conditions and parameters. This would enable “sizing” of the mitigation to be specific to the site conditions. Instead, it appears that the consultant has recommended a mitigation large enough, that any concerns regarding possible discrepancies in the model should inherently be mitigated. The consultant must still demonstrate, through appropriate analysis and utilizing justifiable parameters, that the completed site will be suitably stable for the reviewer to recommend the submittal for approval.

If the site geologic conditions are not well understood and soil parameters utilized in slope stability analysis are not representative of the actual site materials, the calculated factor of safety for temporary slope stability analysis could be misleading. Through appropriate analysis, utilizing justifiable parameters, the consultant 560
Project No. 10113-01 Page 2 October 19, 2018
must demonstrate that they understand and recognize the temporary stability risks and will address them appropriately.

It should be considered that ultimately a comprehensive geotechnical report will be needed for use during site grading. The multiple submittals to date, would not serve well as a suitable guide to addressing the geotechnical aspects of the project during site grading.

The following comments should be addressed regarding the proposed development at the site. Responses to comments should be distributed to the third-party geotechnical reviewer LGC Geotechnical, Inc. (1 copy) and to the City of San Clemente (2 copies).

Based on our review, we have prepared the following preliminary list of our comments regarding the subject grading to be addressed by the project geotechnical consultant. 1) For Geologic Cross-Section A-A’: the eastern limit of the landslide depicted on the cross-section does not match the limits on the geotechnical map, please correct; please update the corresponding slope stability analysis accordingly.
2) The removal depths indicated on Cross-Sections A-A’ and G-G’, at their intersection are not consistent. Please correct; please update the corresponding slope stability analysis accordingly. 3) For Geologic Cross-Section B-B’: the eastern limit of the landslide depicted on the cross-section does not match the limits on the geotechnical map, please correct; please update the corresponding slope stability analysis accordingly. The revised section depicts a large portion of the landslide approximately 15-20’ shallower than previous; what new data justifies this revision? 4) The removal depths indicated on Cross-Sections B-B’ and G-G’, at their intersection are not consistent. Please correct; please update the corresponding slope stability analysis accordingly. 5) The rupture surface depths indicated on Cross-Sections B-B’ and F-F’, at their intersection are not consistent. Please correct; please update the corresponding slope stability analysis accordingly. 6) For Geologic Cross-Section C-C’: The cross-section and map both show proposed five to twentyfoot deep removals planned for Lot 6. Will temporary shoring be provided to protect the adjacent Lot 5 during remedial grading, which appears to be about ten feet higher in elevation than the subject lot? Please provide recommendations and parameters accordingly. 7) The removal depths indicated on Cross-Sections D-D’ and G-G’, at their intersection are not consistent. Please correct; please update the corresponding slope stability analysis accordingly. 8) The rupture surfaces and removal depths indicated on Cross-Sections F-F’ and G-G’, at their intersection are not consistent. Please correct; please update the corresponding slope stability analysis accordingly.
9) The removal depths and key elevation indicated on Cross-Section G-G’ are not consistent with the Geotechnical Map. Please reconcile.
10) With respect to the response to previous Comment No. 16 (LGC Geotechnical, 2018c) addressing temporary stability, please discuss the assumption used in the temporary stability calculations that fill within the shear key grading has progressed to an approximate elevation of roughly 480 feet.

This appears to be an interim condition.
11) Our records indicate that several previous third-party reviews have been provided for the subject project. Please reference and acknowledge consideration and address of the previous review sheets and associated comments.
561
Project No. 10113-01 Page 3 October 19, 2018
12) Please provide a final summary table of soil strength parameters for site soils (e.g., compacted fill, bedrock along and cross bedding, etc.) utilized for design. The response to previous Comment No. 14 (LGC Geotechnical, 2018c) provided a summary of factors of safety with respect to varying shear strengths of compacted fill.
13) We are in agreement that a significant amount of import will be required for the proposed grading.

However, it also appears that much of the fill to be placed will be derived from onsite materials.

Please verify that the required increase in shear strength for compacted fill can be achieved by performing laboratory testing of site materials remolded to 92 percent relative compaction.

Laboratory testing should be per applicable American Society for Testing and Materials (ASTM) and industry standards. Laboratory testing should reflect the stress range of the proposed buttress fill. Please present laboratory test results in your response to this review sheet. 14) Based on the required shear strength necessitated by the slope stability analysis for the majority of the site fills, it would appear that specific requirements for imported material will be necessary.

Please provide a description of appropriate import material and explain the confirmational laboratory testing (type & frequency) to be performed to confirm compliance. 15) Please depict on the geotechnical map and applicable cross-sections the lateral and vertical extent of the area requiring an increased relative compaction criteria to 92 percent relative compaction. 16) The submittal indicates removals to bedrock material. Please provide temporary slope stability analysis for the condition with complete removal (i.e. no interim fill wedge to 480 feet). 17) Geotechnical consultant must review grading plans prior to construction to verify that their recommendations are implemented.

Limitations
Our limited evaluation of the subject report was intended to determine if the major geotechnical aspects of the project were reasonably analyzed and addressed within the general standard of care in our industry. No additional analysis nor independent investigation were performed. As with all geotechnical projects of this type, it is critical that the project geotechnical consultant confirm their provisional findings and recommendations during construction. The fact that we have reviewed the subject plans and report should not be considered an endorsement by LGC Geotechnical of these documents or of the construction operations that result from them.

Closure
Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report.

It should be understood that LGC Geotechnical has relied on the accuracy of documents, verbal information, and other material and information provided by you and other associated parties in preparation of this report.

LGC Geotechnical makes no warranties or guarantees as to the accuracy or completeness of information obtained from or compiled by others.
562
563
Project No. 10113-01 References October 11, 2018
References
California Geological Survey, 2002a, Seismic Hazard Zone Report for the San Clemente 7.5-Minute Quadrangle, Orange County, California, Seismic Hazard Zone Report 062, dated 2002. , 2002b, State of California Seismic Hazard Zones, San Clemente Quadrangle, Official Map, Released:

June 21, 2002.

G.A. Nicoll, 2015, Response to Third-Party Review, Repair of Columbo Landslide, 715, 717, and 719 Avenida Columbo, Lots 6,7 and 8, Tract 898, San Clemente, CA, Project 6893-04.1, dated July 7, 2015. , 2016a, Updated Geotechnical Evaluation, Slope Repair Plans, 715, 717, & 719 Avenida Columbo, Tract 4942, San Clemente, California, Project 6893-04.2, dated March 23, 2016. , 2016b, Response to Review Sheet, Second Third Party Review, Repair of Columbo Landslide, 715, 717, and 719 Avenida Columbo, Lots 6, 7 and 8, Tract 898, San Clemente, California, Project 6893-

04.2, dated March 23, 2016.
, 2017a, Response to Geotechnical Review Sheet, Third, Third Party Geotechnical Review, Repair of Columbo Landslide, 715, 717, and 719 Avenida Columbo, Lots 6, 7, and 8 of Tract 898, San Clemente, California, Project 6893-04.3, dated February 24, 2017. , 2017b, Response to Geotechnical Review Sheet, dated March 29, 2017: Third Party Geotechnical Review, Repair of Columbo Landslide, 715, 717, and 719 Avenida Columbo of Tract 898, San Clemente, California, Project 6893-04.3, dated September 25, 2017. , 2018a, Addendum to G. A. Nicoll and Associates, Inc. Report Dated September 25, 2017, Response to Geotechnical Review Sheets dated March 29, 2017 and May 9, 20016 Revised Geotechnical Map and Cross Sections as requested., Project 6893-04.3, dated January 5, 2018. , 2018b, Avenida Columbo Slide Repair, San Clemente, California, Revised Geotechnical Map & Cross Sections, Project No. 6893-04.3, dated January 2018. , 2018c, Response to Third Party Review and Comments from LGC, Updated Geotechnical Evaluation, Slope Repair Plans, 715, 717, and 719 Avenida Columbo – Tract 898, San Clemente, California, dated November 17, 2017 Project No. 10113-01, G.A. Nicoll Project 6893-04-3, dated March 15, 2018.
, 2018d, Review of Geotechnical Evaluation, Slope Repair Plans, Slope Repair Plans, 715, 717, and 719 Avenida Columbo – Tract 898, San Clemente, California, dated November 17, 2017 Project No. 10113-01, G.A. Nicoll Project 6893-04, dated June 11, 2018. , 2018e, Seventh Response to Third-Party Geotechnical Review from LGC Geotechnical dated July 12, 2018 Slope Repair, 715, 717, and 719 Avenida Columbo, San Clemente, California, G.A. Nicoll Project 6893-04.3, dated August 6, 2018.
564
Project No. 10113-01 References October 19, 2018
LGC Geotechnical, 2012a, Third-Party Geotechnical Review, Geotechnical Submittals for Development of Portions of Tentative Parcel Map 2011-110, San Clemente, California, Project No. 10113-01, dated August 27, 2012.
, 2012b, Third-Party Geotechnical Review, Repair of Columbo Landslide, 715, 717, and 719 Avenida Columbo, Lots 6, 7, and 8 of Tract 898, San Clemente, California, Project No. 10113-01, dated November 15, 2012.
, 2015a, Third-Party Geotechnical Review, Geotechnical Submittals for Development of Portions of Tentative Parcel Map 2011-110, San Clemente, California, Project No. 10113-01, dated January 29, 2015.
, 2015b, Second Third-Party Geotechnical Review, Repair of Columbo Landslide, 715, 717, and 719 Avenida Columbo, Lots 6, 7, and 8 of Tract 898, San Clemente, California, Project No. 10113-01, dated March 18, 2015.
, 2016, Third Third-Party Geotechnical Review, Updated Geotechnical Evaluation, Slope Repair Plans, 715, 717, and 719 Avenida Columbo, of Tract 898, San Clemente, California, Project No. 10113-01, dated May 9, 2016.
, 2017a, Third-Party Geotechnical Review, Updated Geotechnical Evaluation, Slope Repair Plans, 715, 717, and 719 Avenida Columbo, of Tract 898, San Clemente, California, Project No. 10113-01, dated March 29, 2017.
, 2017b, Third-Party Geotechnical Review, Updated Geotechnical Evaluation, Slope Repair Plans, 715, 717, and 719 Avenida Columbo, of Tract 898, San Clemente, California, Project No. 10113-01, dated November 8, 2017.
, 2018a, Third-Party Geotechnical Review, Updated Geotechnical Evaluation, Slope Repair, 715, 717, and 719 Avenida Columbo, of Tract 898, San Clemente, California, Project No. 10113-01, dated February 20, 2018.
, 2018b, Third-Party Geotechnical Review, Updated Geotechnical Evaluation, Slope Repair, 715, 717, and 719 Avenida Columbo, of Tract 898, San Clemente, California, Project No. 10113-01, dated April 9, 2018.
, 2018c, Third-Party Geotechnical Review, Updated Geotechnical Evaluation, Slope Repair, 715, 717, and 719 Avenida Columbo, of Tract 898, San Clemente, California, Project No. 10113-01, dated July 12, 2018.

Peter and Associates, 1994, Geotechnical Recommendations for Repair of Property Located at 719 Avenida Columbo, San Clemente, California, JN94/G4002, dated June 9, 1994 (included within G.A. Nicoll, 2015).
, 2003, Geotechnical Recommendations for Repair of “Columbo Landslide”, Rear of Existing Peter and Adjacent Residences, 715, 717 and 719 Avenida Columbo, Lots 6, 7 and 8 of Tract 898, San Clemente, County of Orange, California, JN 00G0362, JN 03G3317, dated September 10, 2003. 565
Project No. 10113-01 References October 19, 2018
Peter Drilling & Contracting, Inc., 2012, Cover letter for submittal of Peter and Associates, 2003 Report, dated October 16, 2012.

Tan, 1999, Geologic Map of the San Clemente 7.5’ Quadrangle Orange and San Diego Counties, California:

A Digital Database Versions 1.0, California Division of Mines and Geology, Scale 1:24,000, dated 1999.
566
131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com April 29, 2021 Project No. 19206-01
Mr. Ron Nicholas
City of San Clemente
910 Calle Negocio, Suite 100
San Clemente, California 92673
Subject: ThirdǦParty Review of Geotek, Inc., Geotechnical and Infiltration Evaluation, Project Summer, Proposed Industrial Building, Calle Sombra & Calle Cordillera, San Clemente, Orange County, California
Reference: Geotek, Inc., 2021, Geotechnical and Infiltration Evaluation, Project Summer, Proposed Industrial Building, Calle Sombra & Calle Cordillera, San Clemente, Orange County, California, dated April 9, 2021.

Irvine Soils Engineering, Inc., 1997, Rough Graded Geotechnical Report Lots 4, 7, 8, 10, 11 and 13 through 16, Tract 12125, Rancho San Clemente, San Clemente, California, Job No: 01-3088-001-01-10, Log No: 7-8099, dated November 19, 1987.

Engineer: Robert Russell, GE 2042
Geologist: Edward LaMont, CEG 1892
Introduction
In accordance with your request, LGC Geotechnical, Inc. has performed a third-party geotechnical review of the above-referenced report by Geotek, dated April 9, 2021. Our review comments are based on the referenced documents and are in the context of our knowledge of the site and our experience in the vicinity of the site and with projects with similar geotechnical conditions.

Action
Geotechnical Report Recommended for Approval.

Geotechnical Report Recommended for Approval with the Following Condition (see comments below).

Geotechnical Report NOT Recommended for Approval and Requires Revisions and/or Additional Information. Please See the Following Comments/Questions. 567
Project No. 19206Ǧ01 Page 2 April 29, 2021
Comments

1. A copy of the Rough Graded Geotechnical Report applicable to the subject site (Irvine, 1987) was located in LGC Geotechnical’s library. For the benefit of the project, a copy has been included as an attachment to this review letter. Please review the report and update/revise the subject geotechnical evaluation report accordingly. The geologic map, cross-sections and analysis should be updated as needed, as should the project findings, conclusions and recommendations. Please prepare additional cross-sections if warranted. Please include buried geologic units, contacts, faults, and attitudes on the revised geologic map.

2. Please include proposed design grades on geologic cross-sections. Slope stability analysis should be performed based on the proposed site conditions.

3. The geologic map and cross-sections provided in the subject evaluation report (Geotek, 2021) are not consistent with the findings on the reports boring and trench logs. Please reconcile and/or revise. In addition, the map and cross-sections should also be updated based on the consultant’s review of the attached report (Irvine, 1987). For example, but not limited to:
a. Existing landslide material was found in Boring B-1 to depths up to approximately 80 feet below existing grade over intact bedrock material. However, nearby trenches T-10 and T-11 suggests bedrock was encountered at a depth of approximately 4 feet below existing grade. Please reconcile.
b. Boring B-1 indicates landslide material was encountered to a depth of 80 feet below the surface. However, the Geotechnical Map from the attached report (Irvine, 1987) appears to indicate Monterey Formation bedrock should have been encountered at shallow depth. Please reconcile.
c. The geology depicted on Cross-Section C-C’ is not consistent with that presented on the Boring B-1 log. Please reconcile.
d. The depiction of Boring B-1 on Cross-Section C-C’ does not appear to be accurately located. Please reconcile.
e. The legend provided on Cross Section B-B’ includes “Qafu”, but “Qaf” is depicted on the section. Please reconcile.

4. Please provide two geologic cross-sections perpendicular to each other through the proposed industrial building. The cross-sections should depict the design grade, existing site topography, property lines, proposed improvements, geologic contacts, recommended remedial grading and temporary construction slopes. The cross sections should be of sufficient length to allow modelling and evaluation of nearby slopes.

5. Please provide toe of slope setback recommendations and comment on the project’s compliance with the setback.

6. The selection of slope stability shear strength parameters appears to be based on the approximate depth the laboratory test samples were obtained from. Based on review of the shear strength data, considerable variability in shear strength parameters (e.g., phi and c) 568
Project No. 19206Ǧ01 Page 3 April 29, 2021
within each unit was found with no particular correlation to depth. Additionally, it appears portions of the landslide material were reported to have higher shear strength parameters than the intact bedrock. Please provide engineering justification for the use of depth dependent shear strength parameters for slope stability calculations and/or revise the slope stability models and calculations assuming reasonable composite shear strength data, as necessary.

7. The boring logs and test pit logs suggests existing artificial fill soils are generally fine-grained.

However, the selected shear strength for the compacted artificial fill appears to represent a granular soil. Please review and justify the shear strength parameters used for artificial fill in the slope stability calculations based on the site soil conditions.

8. Please comment on the use of a cohesion intercept for the residual shear strength of a landslide rupture surface material.

9. Cross Section C-C’ and boring B-1 suggest buttressed landslide material with a rupture surface was left in place below the site; however, the slope stability calculations present only a circular search. Please perform pre-defined and block failure slope stability analysis searches along the rupture surface to determine the static and pseudo-static safety factors of the landslide block left in place below the site.

10. Based on the provided report (Irvine, 1987) and any other applicable available data, please evaluate and comment on the stability of the slope ascending from the southern portion of the site. In particular, evaluation of the stability of the slope should be performed in consideration of the proposed excavations into it and/or adjacent to it. Additional cross-sections and field work may be warranted to appropriately model and evaluate the conditions.

11. A retaining wall is proposed, cutting into the southern ascending slope, in close proximity to a water main and its easement. Please clarify how the wall type and construction method proposed will not encroach into the easement and will protect the easement and water line for both temporary and permanent conditions.

12. The outline of the site limits depicted on the historic aerial photographs of years 1938 and 1953 appear to be inaccurate. Please relocate.

13. The consultant should review the provided compaction report (Irvine, 1987) and comment if further quantitative analysis of the existing fill is warranted.

14. Please comment on the anticipated future settlement potential of the deep compacted artificial fill.

15. The consultant should perform confirmatory expansion index and corrosion (e.g., sulfate and chloride content) laboratory testing at the completion of grading to verify the preliminary foundation design findings and recommendations. Updated recommendations may be required.

16. The consultant should provide a statement indicating that impacts to adjacent (offsite) properties, slopes, structures and improvements as a result of site grading and construction are not anticipated or provide additional recommendations to protect these offsite improvements, as necessary.
569

 3)K 2)<C)%3;5%#9K %<;BD9C#;CK :DBCK A)E5)FK #;&K #??A<E)K C3)K .;#9K ?A<7)%CK ?9#;BK 5)K 2A#&5;2 ?9#;BK /D;&#C5<;K ?9#;BK A)C#5;5;2K F#99K ?9#;BK )C%K 5;K <A&)AK C<K E)A51K C3#CK C3)K 2)<C)%3;5%#9 A)%<::);&#C5<;BK3#E)K$));K#??A<?A5#C)9HK5;%<A?<A#C)&K#;&K?A<E5&)K#&&5C5<;#9K2)<C)%3;5%#9 A)%<::);&#C5<;BK<AK:<&5.%#C5<;BKC<KC3)K2)<C)%3;5%#9KA)?<ACK#BK;)%)BB#AH 




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



DAK B)AE5%)BKF)A)K?)A*>A:)&K DB5;2K C3)K &)2A))K<*K %#A)K#;&K B8599K<A&5;#A59HK)G)A%5B)&K D;&)AK B5:59#AK %5A%D:BC#;%)BK $HKA)?DC#$9)KB<59BK);25;))ABK#;&K2)<9<25BCBK?A#%C5%5;2K5;K C35BK<AKB5:59#AK9<%#96C5)BK <K <C3)AKF#AA#;CHK)G?A)BB)&K<AK5:?95)&K5BK:#&)K#BKC<KC3)K%<;%9DB5<;BK#;(K?A<*)BB5<;#9K#&E5%)K5;%9D&)&K 5;KC35BKA)?<ACK
CK B3<D9&K $)K D;&)ABC<<&K C3#CK K )<C)%3;5%#9K 3#BK A)95)'K <;K C3)K #%%DA#%HK <*K &<%D:);CBK E)A$#9K 5;*<A:#C5<;K #;&K <C3)AK :#C)A5#9K #;&K 5;/A:#C5<;K ?A<E5&)&K $HK H<DK #;&K <C3)AK #BB<%5#C)&K ?#AC5)BK 5;K ?A)?#A#C5<;K<*KC35BKA)?<ACKK)<C)%3;5%#9K:#8)BK;<KF#AA#;C5)BK<AK2D#A#;C))BK#BKC<KC3)K#%%DA#%HK<AK %<:?9)C);)BBK<*K5;+<A:#C5<;K<$C#5;)&K0<:K<AK%<:?59)&K$HK<C3)AB 3<D9&KH<DK3#E)K#;HK @D)BC5<;BKA)2#A&5;2KC35BKA)E5)FK?9)#B)K&<K;<CK3)B5C#C)KC<K%<;C#%CK<DAK<-%)K")K #??A)%5#C)KC35BK<??<ACD;5CHKC<K$)K<*KB)AE5%)K
5;%)A)9HK





 


H#;K<D29#BKK

K

A<7)%CK;25;))AK

#::K
CC#%3:);CBK AE5;)K 
K
5BCA5$DC5<;K  K &'A)BB))K)9)%CA<;5%K%<?IK


 
)E5;KK<9B<;KK

K
!5%)K
A)B5&);CK


 

)*)A);%)K<:5CC)&K*<AK
&
K
570
131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com April 7, 2022 Project No. 19206-01
City Project No. ENG22-048
Ms. Emily Sherwood
City of San Clemente
910 Calle Negocio, Suite 100
San Clemente, California 92673
Subject: ThirdǦParty Geotechnical Review of Geotechnical Investigation, Proposed Duplex, 129 Avenida Florencia, San Clemente, California
Report: Global Geo-Engineering, Inc., 2021, Geotechnical Investigation Report Update, New Single-Family Residential Development, 129 Avenida Florencia, San Clemente, California, Project No. 1741-04, dated November 18, 2021.

Engineer: Mohan B. Upasani, GE 2301
Geologist: Allan Kazem
Introduction
In accordance with your request, LGC Geotechnical, Inc. has performed a third-party geotechnical review of the above-referenced report by Global Geo-Engineering, Inc., dated November 18, 2021. Our review comments are based on the referenced documents and are in the context of our knowledge of the site and our experience in the vicinity of the site and with projects with similar geotechnical conditions.

Action
Geotechnical Report Recommended for Approval.

Geotechnical Report Recommended for Approval with the Following Condition (see comments below).

Geotechnical Report NOT Recommended for Approval and Requires Revisions and/or Additional Information. Please See the Following Comments/Questions. 571
Project No. 19206Ǧ01 Page 2 April 7, 2022
Comments

1. The reviewed reports indicate that a landslide, spanning multiple lots, failed below the site in 1978. The landslide was an internal failure of a portion of a larger ancient landslide. Please provide information and documentation on how the landslide failure was mitigated.

2. Please update the project Geologic Map to include the proposed grading and construction for the proposed development. Please also include recommended remedial grading, temporary construction slopes, temporary and permanent shoring, and proposed and existing landslide mitigation measures.

3. Please update Cross-Section A-A’ to include the proposed grading and construction for the proposed development. Please also include recommended remedial grading, temporary construction slopes, temporary and permanent shoring, and proposed and existing landslide mitigation measures.

4. Please provide appropriately located and oriented, additional geologic cross-sections where significant excavation will be required in close proximity to property lines. The cross-sections shall depict the design grade, site topography, property lines, proposed improvements, existing offsite adjacent improvements, geologic contacts and structure, recommended remedial grading, temporary construction slopes, temporary and permanent shoring, and proposed and existing landslide mitigation measures.

5. The slope stability analysis provided is over 17 years old and does not reflect the proposed development. Updated slope stability analysis should be performed and demonstrate a suitable, post-development, factor of safety for both the ancient and recent landslides. The analysis should be performed based on the proposed grading and development of the site.

6. The proposed caisson design parameters should be incorporated into the slope stability analysis to demonstrate the impact the proposed caissons have on increasing the safety factor to acceptable levels.

7. Please perform slope stability analysis to demonstrate and provide appropriate recommendations and parameters to ensure that the proposed project shall not cause substantial risk or damage to the adjacent properties and improvements.

8. The bedding attitudes reported in the Capistrano Formational material are much steeper than typically encountered in this area. Please justify. Is there any concern that the steep bedding and “slight shearing” reported in bucket auger boring B-1 could be an indication of a deeper landslide?

9. The project development plans appear to depict the existing retaining wall, underlying undocumented fill and landslide debris, as well as undocumented fill and landslide debris to the south of the existing retaining wall as being left-in-place. Please comment on/discuss the suitability of this portion of the site.

10. The consultant should acknowledge and appropriately address the fact that the site is located in a Zone of Required Investigation for Earthquake-Induced Landslides for the Seismic Hazard Zone map for the Dana Point 7.5-minute quadrangle.
572
Project No. 19206Ǧ01 Page 3 April 7, 2022

11. Please comment on the use of site class “D” in lieu of site class “C” when considering the site is underlain by Capistrano formation bedrock at relatively shallow depths. Please update the seismic design parameters if necessary.

12. The recommendations for lateral earth pressures on retaining walls provided in the report appear to be suitable for granular soils and not highly expansive soil retaining wall backfill.

Please comment.

13. Please provide a horizontal span to apply the recommended differential static settlement.

14. Please clarify the statement:
“It should be noted that even with the deep caisson foundation, there may be a possibility of ground movement which could affect the performance of the proposed structures.”

15. Please clarify the statement:
“Any loosening of reworked or native material, consequent to the passage of construction traffic, weathering, etc., should be made good prior to further construction.”

16. Temporary and permanent shoring parameters and recommendations should be provided based on the on-site and off-site conditions. These should include consideration of the on-site and off-site left-in-place landslide debris, potential surcharge from detrimental structure within the landslide, of the rupture surface(s), and the steep bedrock bedding encountered.

Loading of adjacent structures should also be considered.

17. The geotechnical consultant must review and approve the final project plans (e.g., grading plans, foundation plans, shoring plans, retaining wall plans, etc.) in order to verify that the geotechnical recommendations have been appropriately incorporated and provide additional geotechnical recommendations or modifications to the geotechnical report, as necessary.

Limitations
Our limited evaluation of the subject report was intended to determine if the major geotechnical aspects of the project were reasonably analyzed and addressed within the general standard of care in our industry. No additional analysis nor independent investigation were performed. As with all geotechnical projects of this type, it is critical that the project geotechnical consultant confirm their provisional findings and recommendations during construction. The fact that we have reviewed the subject plans and report should not be considered an endorsement by LGC Geotechnical of these documents or of the construction operations that result from them. 573
Project No. 19206Ǧ01 Page 4 April 7, 2022
Closure
Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report.

It should be understood that LGC Geotechnical has relied on the accuracy of documents, verbal information, and other material and information provided by you and other associated parties in preparation of this report. LGC Geotechnical makes no warranties or guarantees as to the accuracy or completeness of information obtained from or compiled by others.

Should you have any questions regarding this review, please do not hesitate to contact our office. We appreciate this opportunity to be of service.

Sincerely,
LGC Geotechnical, Inc.

Ryan Douglas, GE 3147 Kevin B. Colson, CEG 2210
Project Engineer Vice President
KBC/RLD/klr
Attachments: Appendix A – References
Distribution: (1) Addressee (electronic copy)
c.
7 574
Project No. 19206Ǧ01 Page 5 April 7, 2022

APPENDIX A
References
City of San Clemente, 1992, City of San Clemente Report Review Checklist, Geotechnical Report, Preliminary Geotechnical Investigation to Evaluate Development Feasibility; Vacant lot at 129 Avenida Florencia, San Clemente, California (dated January 24, 1989), Job No. 92-3, dated March 9, 1992.
_________, 2005, City of San Clemente Report Review Checklist, Geotechnical Report, Geotechnical Investigation Report, New Single-Family Residential Development, 129 Avenida Florencia, San Clemente, California dated October 18, 2004, Project No. 1741-04, City Job No. 05-02, dated January 30, 2005.

Global Geo-Engineering, Inc., 2004, Geotechnical Investigation Report, New Single-Family Residential Development, 129 Avenida Florencia, San Clemente, California, Project 1741-04, dated October 18, 2004.
_________, 2005, Response to City of San Clemente Report Review Checklist – Geotechnical Report 129 Avenida Florencia, San Clemente California, Project 1741-04, dated March 21, 2005. _________, 2012, Geotechnical Report Update, New Single-Family Residential Development, 129 Avenida Florencia, San Clemente, California, Project 5038-04, dated April 18, 2012. _________, 2021, Geotechnical Investigation Report Update, New Single-Family Residential Development, 129 Avenida Florencia, San Clemente, California, Project No. 1741-04, dated November 18, 2021.

Jacqelyn Obryan, 2022, Precise Grading Plan, Lot 4, Tract No. 820, 129 Avenida Florencia, undated, received March 23, 2022. David A. Purkis, PE, 2022, Temporary Shoring and Site Wall Structural Plan, 501 Elena Lane, San Clemente, California, Project No. 21-4237, dated January 19, 2022.

William R. Munson, Inc., 1989, Preliminary Geotechnical Investigation to Evaluate Development feasibility: Vacant Lot at 129 Avenida Florencia, San Clemente, California, dated January 24, 1989. 575

Page 28 ends

2024 Professional Fee Schedule
576
131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com 2024 PROFESSIONAL FEE SCHEDULE

GEOTECHNICAL SERVICES
Professional Billing Rate (per hour)
Word Processing .......................................................................................................................................................................... $ 75.00 CAD Operator ................................................................................................................................................................................. 100.00 Junior Field Technician .............................................................................................................................................................. 100.00 Senior Field Technician/Field Supervisor/Operations Manager ............................................................................. 115.00 Jr./Sr. Field Technician/ Field Supervisor/Operations Manager Prevailing Wage .......................................... 160.00 Jr. Staff Engineer/Geologist ...................................................................................................................................................... 125.00 Staff Engineer/Geologist ........................................................................................................................................................... 135.00 Senior Staff Engineer/Geologist ............................................................................................................................................ 145.00 Project Engineer/Geologist ...................................................................................................................................................... 155.00 Senior Project Engineer/Geologist ........................................................................................................................................ 175.00 Geotechnical Engineer/Engineering Geologist/Project Manager ............................................................................ 185.00 Senior Geotechnical Engineer/Engineering Geologist/Project Manager.............................................................. 195.00 Vice President of Engineering/Geology/Project Management ................................................................................. 205.00 Senior Vice President of Engineering/Geology/Project Management ................................................................... 215.00 Director of Engineering/Geology ........................................................................................................................................... 225.00 Associate Engineer/Geologist ................................................................................................................................................. 235.00 Principal Engineer/Geologist .................................................................................................................................................. 250.00 Senior Principal Engineer/Geologist .................................................................................................................................... 275.00 Engineering Equipment
Field Vehicle Usage ................................................................................................................................................. $ 10.00/per hour Vehicle Mileage ......................................................................................................................................... included in vehicle usage Nuclear Soil Gauge and Inclinometer .................................................................................................. included in hourly rate Other Monitoring Equipment ..................................................................................................................................... Upon Request Laboratory Tests
Moisture Content .................................................................................................................................................................................. $ 30.00 Moisture and Density (ring samples) ................................................................................................................................................. 45.00 Maximum Dry Density (optimum moisture content) .............................................................................................................. 285.00 Maximum Density Checkpoint .............................................................................................................................................................. 85.00 Sieve Analysis ............................................................................................................................................................................................ 185.00 Hydrometer Analysis.............................................................................................................................................................................. 145.00 Sieve and Hydrometer Analysis ......................................................................................................................................................... 240.00 Percent Passing No. 200 Sieve ............................................................................................................................................................... 90.00 Liquid Limit and Plastic Limit ............................................................................................................................................................ 235.00 Liquid Limit – Non-Plastic (1pt) ........................................................................................................................................................ 110.00 Sand Equivalent ........................................................................................................................................................................................ 140.00 Expansion Index ....................................................................................................................................................................................... 170.00 Direct Shear (shear rate of 0.05 in./min.) ..................................................................................................................................... 385.00 Direct Shear (shear rate of lower than 0.05 in./min.) .............................................................................................................. 465.00 Single Point Shear .................................................................................................................................................................................... 140.00 Unconsolidated Undrained Triaxial Shear .................................................................................................................................... 225.00 Consolidation (w/o time rate) ........................................................................................................................................................... 255.00 w/time rate, add (per increment) ............................................................................................................................................. 60.00 w/extra load, add (per load) ........................................................................................................................................................ 55.00 Collapse Test (ASTM D4546-B) ......................................................................................................................................................... 140.00 R-Value (untreated) ................................................................................................................................................................................ 400.00 577
131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com R-Value (treated) ..................................................................................................................................................................................... 440.00 Sulfate Content .......................................................................................................................................................................................... 100.00 Chloride Content ...................................................................................................................................................................................... 100.00 Corrosive Suite (minimum resistivity, pH, sulfate and chloride) ........................................................................................ 345.00 Organic Matter Content ........................................................................................................................................................................... 85.00 Caltrans 216 Compaction ..................................................................................................................................................................... 325.00 Stipulations
i All professional rates are accrued from portal to portal. i Expert witness testimony, depositions, or mediation conferences, will be billed at 2.0 times the professional billing rate.
i All geologists, engineers, and technicians will be billed at time-and-a-half for overtime. Overtime is defined as more than 8 hours in one day and any time worked on weekends, state holidays or night shifts. Double time will be billed when more than 12 hours are worked in one day or more than 8 hours on weekends, state holidays or night shifts. Scheduling Field Technicians less than 48 hours in advance may result in their hours being billed at overtime rates. i Invoices are rendered monthly, payable upon receipt.
i Proposals are valid for 30 days, unless otherwise stated. i Heavy equipment, subcontractor fees and expenses, supplemental insurance, travel, shipping, outside reproduction, and other reimbursable expenses will be invoiced at cost, plus 20 percent. i Prior to initiating our field work, client agrees to provide all information in client’s possession about actual or possible presence of underground utilities and/or hazardous materials on the site.

Client agrees to reimburse LGC Geotechnical for all costs related to unanticipated discovery of utilities and/or hazardous materials.
i Prior to initiating our field work, client agrees to provide all information in client’s possession with regard to restricted entry and/or exploration areas, such as areas of environmental contamination, hazardous soils, sensitive habitat areas, etc. Client agrees to reimburse LGC Geotechnical for all costs related to environmental contamination, hazardous soils, sensitive habitat areas, etc. i Client is responsible for providing safe and legal access to the site at all times. i LGC Geotechnical will not be liable for any loss, damage or liability to persons or property arising out of performance of our service that is not covered and paid for by our insurance. For any other loss, damage or liability which is not covered by insurance, our liability will be limited to the lessor of either $10,000 or the total amount paid by client to LGC Geotechnical on the project in question. i These rates are based on standard insurance coverage. If higher insurance limits are required client should discuss these limits, and the associated cost, with LGC Geotechnical prior to the initiation of our services.
i LGC Geotechnical’s services will be performed in accordance with generally accepted standards of care and diligence normally practiced by geotechnical consulting firms performing services of a similar nature in Southern California. No other warranty, either expressed or implied, is included or intended in LGC Geotechnical’s proposals, contracts, reports, etc. i Quoted laboratory test rates assume samples are free of hazardous materials. Handling and testing of samples containing hazardous materials may include additional costs. 578
January 20, 2025
Mr. Zak Ponsen, PE
Assistant City Engineer

CITY OF SAN CLEMENTE
910 Calle Negocio, Suite 100
San Clemente, CA 92673 GMU Proposal P-25005
Subject: Proposal for On-Call Geotechnical Plan Check Services, City of San Clemente
Reference: City of San Clemente “Request for Proposal, On-Call (As-Needed) Geotechnical Plan Check Services”, dated December 23, 2024 Dear Mr. Ponsen:

GMU is pleased to submit this proposal for providing on-call geotechnical plan check services.

GMU is a small business enterprise (SBE) with over 30 years of experience providing geotechnical plan check services to municipalities. Given our history, background, and technical expertise, GMU believes we are highly qualified to provide the requested services. We appreciate the opportunity to provide this proposal and look forward to continuing to work with the City of San Clemente in the future.

The key elements of our proposal include:
x Our methodology and approach to providing on-call plan check services such that City Staff and the applicant find the process straight-forward and efficient. x Our detailed work plan explaining how we perform reviews such that we meet our typical turnaround times of 10 working days for new submittals and 5 working days for responses.
x Details of our project team, consisting of a Certified Engineering Geologist, Geotechnical Engineer, and oversight by our President and Geotechnical Engineer, who have been working together on review/plan check services for current clients for over 19 years. x Discussion of review costs and sample review sheets.
x Discussion of the fee sheet developed by GMU for our clients’ use in streamlining application budget tracking.
x References for current clients that have used GMU for on-call geotechnical plan check services for up to 30 years.

The enclosed proposal and fees are valid for a period of 90 days. $WWDFKPHQW
579
Mr. Zak Ponsen, Assistant City Engineer, CITY OF SAN CLEMENTE Proposal for On-Call Geotechnical Plan Check Services
January 20, 2025 2 GMU Proposal P-25005
Our qualifications are summarized as follows:
x Over 30 years’ experience providing geotechnical review services to municipalities, particularly in south Orange County.
x Project team members’ experience ranges from 19 to over 30 years providing review services to municipalities.
x Provide innovative ideas to streamline review process for both City Staff and applicants. x No conflict of interest issues within the City of San Clemente. x Office within 25 minutes of City Hall and all staff available 24/7 via cell phones for emergencies.
x Fee-free initial consultation for various issues throughout the City.

GMU is a full-service geotechnical engineering firm offering a variety of geotechnical engineering services as well as a list of specialty services that complement our geotechnical engineering capabilities. GMU is a Small Business Enterprise (SBE) with over 50 years of experience in Southern California and South Orange County. GMU has established a reputation for reliability, innovation, accuracy, efficiency, and excellent service, resulting in reduced cost, reduced man-hours spent on scheduling or project coordination, and reduced risk for our clients.

These clients choose to maintain long-term relationships with us because of the benefits of our reputation and experience. Our clients include City, County, and other public agencies, in addition to private owners, developers, and contractors. GMU is an award winning firm recognized by ASCE, CELSOC, and CalGeo.

GMU is an “S” Corporation with three company owners and principals; Mr. Gregory Silver, Mr.

Michael Moscrop, and Mr. Aron Taylor.

Please do not hesitate to call if you have any questions regarding this information.

Respectfully submitted,
Gregory Silver, M.Sc., PE, GE
President/CEO
Principal Engineer
30336 Esperanza
Rancho Santa Margarita, CA 92688
949-888-6513
Attachments:

Appendix A – Sample Correction Lists and Forms
Appendix B – Resumes
580
Proposal, On-Call Geotechnical Plan Check Services 1

BACKGROUND AND APPROACH
Based on our review of the Request for Proposal, our experience working with the City of San Clemente, and our experience as geotechnical reviewers for similar agencies, our understanding of the City, the work to be done, and the goal objectives are as follows:
x The City is well-established, with a variety of development types, ranging from multifamily apartments to custom single-family residences, with retail, commercial, and master planned communities. The City’s geography ranges from beach-front property to hillside developments, with a variety of geologic and geotechnical challenges. x The City is seeking at least one consultant for on-call geotechnical plan check services, particularly consultants with review experience in hillside areas prone to landsliding.

These reviews will be performed by a Certified Engineering Geologist and Geotechnical Engineer licensed in the State of California. Review comments and fees will be prepared and distributed per the City’s requirements.
o In performing reviews for a variety of agencies, GMU has developed a review sheet form as well as a unique fee sheet that delivers the review comments in a clear and concise manner, and provides fees to City Staff at the time of the review for immediate tracking. This review sheet and fee sheet form are currently used for City of San Clemente reviews provided by GMU. Samples of these forms are included in this proposal in Appendix A, and discussed further in the Sample Plan Review Correction Lists and Forms section.
x Geotechnical plan check services will include planning, engineering, grading, and building permit submittals, including geotechnical review of reports, plans, calculations, and specifications for a variety of projects. These services may be done using plan software or other electronic means.
o GMU staff are comfortable with a variety of software programs, including Bluebeam. In addition, we are familiar with agency portals such as EPL, etc.

Should the City request GMU perform reviews using specific software programs, GMU is prepared to utilize the systems requested.
x Awarded consultants will be expected to provide exemplary customer service within the specified review time period. GMU is dedicated to providing excellent service to all of our clients. This will be further discussed in the Methodology section, and can be verified by contacting the references we provide in this proposal. x GMU has worked on many projects within and adjacent to the City of San Clemente, including the Cypress Shores landslide, Talega, the Sea Pointe Estates landslide (west of Camino de las Mares), Miramar Theater, La Pata Avenue extension, Interstate 5 widening, Villa Pacifica slope failure, and landslide complex studies within Prima Deshecha landfill; however, currently we do not have projects of significance within the City and do not anticipate conflicts of interest during the duration of this contract.

Should a project arise that could potentially result in a conflict, our policy is to discuss this potential conflict with City Staff so that an alternative plan for review of any permits may be established prior to permit application submittal. 581
Proposal, On-Call Geotechnical Plan Check Services 2

METHODOLOGY
We propose to continue to provide geotechnical plan check services to the City of San Clemente using the same methodology and work plan that we currently utilize for the City. Our goal is to provide a complete geotechnical review based on current Codes, Agency manuals, regulations, and industry standards in south Orange County.

Our review methods are a team effort; GMU’s geologist and engineer typically review the submittal separately, and then meet to discuss any comments or concerns. In some cases, submittals may only require review by our Geologist; in these cases, both time and cost can be saved. Some projects may require multiple discussions, and complex projects often require in-house discussion between geologist and engineer prior to review. These projects with complex or high-profile elements are often overseen by our President and Principal Geotechnical Engineer as a quality control measure. If necessary, questions or observations of the report or plans will be conveyed to City Staff during the review process.

GMU takes a proactive stance on the review process and welcomes discussion with consultants, engineers, applicants, and City Staff. With Staff permission, we will review draft responses submitted by email, particularly for difficult projects. This draft review often expedites response turnaround times and also the overall geotechnical approval of submittals, providing a better service to applicants.

Another aspect of our plan check service methodology is to provide a clear and concise format for review comments, as shown in the sample review sheets attached to this proposal in Appendix A. In addition, GMU has developed a fee sheet format that provides our fees in a cumulative spreadsheet to City Staff at the time of the review for more efficient tracking and processing of fees and maintenance of deposit accounts.

In addition to the above, we also currently provide additional services to our agency clients including attendance at meetings with applicants and project teams, Planning Commission and Council meetings, as well as site meetings and emergency response during rain events or slope movement issues.

WORK PLAN
The work plan for our review process is proposed to continue as follows:

1. Immediately upon receipt of submittal, package is logged into our electronic database, tagged with the due date, and placed in a specific file in the Project Manager’s office. a. Note that for all agency clients, including San Clemente, our turnaround times are:
i. New submittal – 10 working days
ii. Response – 5 working days

2. The submittal is given an initial review by the Project Manager within 3 working days.

At this time, it may be decided that the review can be completed by only one reviewer, saving time and cost in the review process.
582
Proposal, On-Call Geotechnical Plan Check Services 3

3. Geologist review is completed within 7 working days.

4. Engineer review is completed within 9 working days, concurrent with geology review.

5. Deliverable – Review sheet and fee sheet is finalized within 10 working days and distributed per the City’s requirements.
a. Note that currently, GMU distributes the review and fee sheet to City Staff via email.
b. We prefer to use electronic distribution where possible and where approved by the agency, and are also familiar with uploading to portals such as Bluebeam Studio, Sharepoint, etc.

6. Response review times are shortened to meet the 5 working day deadline.

7. In general, 100 percent of this work will be performed at our office in Rancho Santa Margarita.

PROJECT ORGANIZATION AND STAFFING
The Project Manager and key contact for these on-call services will continue to be Ms. Lisa Bates, PG, CEG, QSD, QSP, Associate Geologist/Director of Municipal Geotechnical and Engineering Services. Lisa currently fulfills this role for all agency reviews by GMU, including San Clemente, and has performed this role for the past 19 years. Lisa’s responsibilities for this work will include tracking incoming submittals, performing geologic reviews, tracking engineering review timelines, and ensuring the review is completed within the turnaround time.

Lisa will also contact City Staff with any issues or concerns in regards to any submittals. GMU strives to minimize the support required of City Staff; however, basic information for each review will be required, such as permit number, address, project description, and applicant contact information. Lisa also provides additional services such as attendance at meetings, conference calls, emergency needs, or any other geotechnical services that may assist the City.

The Reviewing Engineer for this work will continue to be Mr. David Hansen, M.Sc., PE, GE, Associate Engineer. David currently provides this role for most agency reviews by GMU, and has performed engineering reviews for agencies for over 19 years. David’s responsibilities will include performing engineering reviews, preparing review sheets, and coordinating with Lisa to ensure the review is completed within the turnaround time.

Oversight and supplemental engineering input will continue to be provided by Mr. Gregory Silver, M.Sc., PE, GE, President/Principal Engineer. Greg currently provides this role for all agency reviews by GMU, and also performs engineering reviews for complex projects. Greg has provided geotechnical engineering review services to many agencies for over 35 years, including cities with complex landslide issues such as Malibu and agencies on the Palos Verdes Peninsula.

Hours spent per review vary depending on the type of review and complexity of the proposed construction and/or geotechnical conditions. This is discussed further in the Cost Data Section.

All team members identified above are available on an as-needed basis for reviews for the length of this contract. Resumes for each team member are attached to this proposal in Appendix B, and an organization chart is shown below.
583
Proposal, On-Call Geotechnical Plan Check Services 4

RELATED EXPERIENCE
GMU and its staff have a long history providing services to Cities and various municipalities throughout Orange County and Southern California.

Current City/Municipality Geotechnical Review/Plan Check/Field QA/QC Work x City of San Clemente – City geotechnical plan check services. x City of Laguna Niguel – City’s geotechnical consultant for 25 years, providing on-call services to Community Development, Engineering, and Public Works departments. x City of Chino Hills – City geotechnical services providing both plan check and design level services as well as inspection services.
x City of Mission Viejo – City geotechnical services including review/plan check, Public Works design and inspection services.
x City of Lake Forest – City QA/QC field services and consultation on public works projects.
x City of Rancho Santa Margarita – City Geotechnical and Pavement Engineering Consultant since 2005 for both reviews and public works projects. x City of Newport Beach – City geotechnical consultant providing: geotechnical design, pavement engineering, pavement testing and inspections, forensic/expert witness consulting, and QA/QC services for major public works projects. x City of Anaheim – City geotechnical plan check services.

Lisa Bates, PG, CEG, QSD, QSP
Associate Geologist
Project Manager
Reviewing Geologist
David Hansen, M.Sc., PE, GE
Associate Engineer
Reviewing Engineer
Gregory Silver, M.Sc., PE, GE
President
Principal Engineer
QA/QC Oversight
584
Proposal, On-Call Geotechnical Plan Check Services 5
References
City of Laguna Niguel
Contact: Ms. Katie Crockett, Planning Manager
30111 Crown Valley Parkway
Laguna Niguel, CA 92677
[email protected]
949-362-4363
Project Description: Geotechnical review/plan check services, attendance at applicant and project team meetings, Planning Commission and Council meetings, teleconferences with City Staff on complex projects, emergency services for landslides and slope issues.

Key GMU Staff: Lisa Bates, Greg Silver, David Hansen
City of Anaheim
Contact: Mr. Cesar Morales, Principal Traffic Engineer
200 S. Anaheim Blvd
Anaheim, CA 92805
[email protected]
714-765-5286
Project Description: Geotechnical review/plan check services.

Key GMU Staff: Lisa Bates, Greg Silver, David Hansen
City of Mission Viejo
Contact: Mr. Rich Schlesinger, Deputy Director/City Engineer 200 Civic Center
Mission Viejo, CA 92691
[email protected]
949-470-3079
Project Description: Geotechnical review/plan check services, attendance at applicant and project team meetings, teleconferences with City Staff on complex projects, emergency response services.

Key GMU Staff: Lisa Bates, Greg Silver, David Hansen
585
Proposal, On-Call Geotechnical Plan Check Services 6

SAMPLE PLAN REVIEW CORRECTION LISTS AND FORMS
We have provided sample correction lists in Appendix A for a variety of permit types, including:
x Building permits – retaining walls, foundation underpinning, swimming pools x Grading permits – multi-family residential, retail/commercial x Planning/Engineering/Grading - Landslide repairs and complex slope stability issues Also included in this Appendix is a sample of the fee sheet developed by GMU, currently used for City of San Clemente reviews.

In addition, GMU has assisted City clients in developing various guidelines, memos, and handouts for applicants to streamline the permit application process. Examples of these guidelines are also included in Appendix A. We have found the use of these guidelines assists applicants and their consultants in understanding what needs to be submitted, as well as expediting our review process by using the guidelines as a review checklist.

PROJECT SCHEDULE
As discussed, our typical turnaround times for existing review clients, including the City of San Clemente, is 10 working days for new submittals, and 5 working days for subsequent response submittals. We are prepared to continue to provide these same turnaround times to the City of San Clemente for typical reviews, shortening the schedule requirements within the RFP by several days. Expedited reviews can be performed upon request by City Staff at no additional charge.

COST DATA
Our experience with providing a variety of review and plan check services to various agencies over the past several decades tells us that review/plan check time and cost varies widely by type of project and the complexity of the design and underlying geotechnical conditions. We provide these services via both hourly rate and flat fee, depending on negotiations with the agency.

Currently, reviews for the City of San Clemente vary from flat fee to hourly fees. GMU is prepared to continue to provide services based on the current Engineering Fee Schedule. Below are cost ranges for the most common types of project permits. Our current Fee Schedule is provided in a separate envelope submitted with this proposal. x Residential retaining wall, foundation underpinning, swimming pool permit – o Typically 2 to 4 hours of Associate Geologist/Engineer time o Cost range $600 - $1000 depending on number of responses x Single-family residential grading permit –
o Typically 2 to 5 hours of Associate Geologist/Engineer time o Cost range $600 to $1,200 depending on number of responses x Planning level review, residential/retail/commercial development – o Typically 4 to 8 hours of Associate Geologist/Engineer time o Cost range $1,100 to $2,200 depending on number of responses 586
Proposal, On-Call Geotechnical Plan Check Services 7

STATEMENT OF COMPLIANCE
This proposal is in strict compliance with the Request for Proposal and Draft Agreement, and no exceptions to either are proposed.

It should be noted this statement of compliance also includes Item 12 under Proposal Format and Content of the Request for Proposal.
587

APPENDIX A
Sample Correction Lists and Forms
588
APPENDIX A-1
Sample Correction Lists
589

CITY OF SAN CLEMENTE
Engineering Department – Land Development
910 Calle Negocio
San Clemente, California 92673
Phone (949) 361-6136 | Fax (949) 366-4741

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513 x Fax: (949) 888-1380 x email: [email protected] Page 1 PROJECT/PERMIT NO.: ENG23-220 DATE: August 29, 2023
PROJECT DESCRIPTION: Proposed Single Family Residence ________________________________ LOCATION: 2868 Via Bellota __________________________________________________________ DEVELOPER/OWNER: Pritesh Patel ____________________________________________________ GEOTECHNICAL FIRM: W.C. Hobbs, Consulting Engineer __________________________________ THEIR JOB NO.: 20015-1A ____________________________________________________________ GEOTECHNICAL ENGINEER: Willam Hobbs, PE 42265 ____________________________________ ENGINEERING GEOLOGIST: Mark Slatten, CEG 1605 _____________________________________ DOCUMENT(S) REVIEWED: (1) “Geotechnical Report, Foundation Design Parameters and Recommendations, Proposed Single Family Residence, Lot 26, 2868 Via Bellota, San Clemente, California,” prepared by W.C. Hobbs, Consulting Engineer, dated September 1, 2021; (2) Supplemental Geotechnical Report, Slope Stability Analysis, Proposed Single Family Residence, Lot 26, 2868 Via Bellota, San Clemente, California,” prepared by W.C. Hobbs, Consulting Engineer, dated April 15, 2023; (3) Precise Grading Plan for 2868 Via Bellota, Lot 26, Tract 9764, San Clemente, prepared by W.C.

Hobbs, Consulting Engineer, dated June 29, 2023.

ACTION:

RECOMMENDED APPROVAL OF DOCUMENT(S) SUBMITTED

CONDITIONAL APPROVAL OF DOCUMENT(S) SUBMITTED

X REQUEST ADDITIONAL DATA FOR REVIEW – See COMMENTS.

Please send responses directly to the City of San Clemente, Land Development Division.

GMU Geotechnical can only accept responses forwarded from the City. 590

CITY OF SAN CLEMENTE
Engineering Department – Land Development
910 Calle Negocio
San Clemente, California 92673
Phone (949) 361-6136 | Fax (949) 366-4741

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513 x Fax: (949) 888-1380 x email: [email protected] Page 2 PROJECT/PERMIT NO.: ENG23-220 DATE: August 29, 2023

COMMENTS

1. The report provides recommendations that are based on the 2019 CBC rather than the current 2022 CBC. Either revise the report to reflect the 2022 CBC or provide a statement that the recommendations of the report are also applicable to the 2022 CBC.

2. The seismic design parameters are based on Soil Class C; however, no deep exploration was performed to determine the shear wave values or the N values of the onsite soils with depth.

Therefore, the seismic design parameters should be re-evaluated based on Soil Class D.

3. The report does not describe the total height of the adjacent descending slope and the geologic sections do not show the slope all the way to its toe. Therefore, please provide the overall height of the slope (H) and the recommended corresponding slope setback distance (H/3) to meet current CBC slope setback requirements.

4. The report states that monitoring indicates that the site is experiencing lateral movement due to possible residual movement of the landslide mass. No evidence was provided to indicate that this movement has ceased and will not continue; therefore, will any mitigating measures be required such as flexible connections for utility lines running from the residence into the adjacent street or a mat or post-tension foundation system for the proposed residence?

5. The retaining wall proposed along the southern side of the site and up against the existing property line wall will need to be constructed in sections using slot cutting. Coordinate with the project civil engineer to add a note to the grading plans stating that this wall should be constructed in sections using slot cutting. In addition, the backcut behind the wall cannot be laid back to place non-expansive soil to a distance of H/2 behind the wall as shown on Figure 2 of the wall. Therefore, please provide a revised active earth pressure for this retaining wall that is based on native moderately expansive soil backfill rather than imported non-expansive soil.

6. The geotechnical consultant should review the finalized grading plans, retaining wall structural plans and calculations, and building foundation plans and calculations for conformance with the parameters and recommendations of their geotechnical report, supplemental report and forthcoming response letter. Once approved, the geotechnical consultant should stamp and sign the plans. This may be a condition of approval.
591

CITY OF SAN CLEMENTE
Engineering Department – Land Development
910 Calle Negocio
San Clemente, California 92673
Phone (949) 361-6136 | Fax (949) 366-4741

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513 x Fax: (949) 888-1380 x email: [email protected] Page 3 PROJECT/PERMIT NO.: ENG23-220 DATE: August 29, 2023
Note: The City of San Clemente, through the permitting process, previously approved the evaluation and repair of the existing landslide performed by other professional consultants; however, the City did not own or sell this lot, nor did the City supervise the repair work. This clarifies the content of the reviewed reports. No response to this note is required.

REVIEWED BY: _______________________________________________________________ Lisa Bates, PG, CEG 2293 David Hansen, M.Sc., PE, GE 3056 Associate Geologist Associate Engineer
592

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513 x Fax: (949) 888-1380 x email: [email protected] Page 1 REFERENCE NO.: G23-0009 DATE: August 3, 2023
PROJECT DESCRIPTION: Proposed Precise Grading _______________________________________ LOCATION: 30652 San Felipe, TTM 17721, The Cove at El Niguel ____________________________ APPLICANT/OWNER: WJK Development Co. ____________________________________________ GEOTECHNICAL FIRM: American Geotechnical, Inc. ______________________________________ THEIR JOB NO.: 33348-09 ____________________________________________________________ GEOTECHNICAL ENGINEER: Fei-Chiu Huang, GE 2601; Gregory W. Axten, GE 103 ____________ ENGINEERING GEOLOGIST: Craig Chase, CEG 2225 _____________________________________ DOCUMENT(S) REVIEWED: (1) “Geotechnical Review of Final Rough Grading Plan, Construction Plans for the Improvement of The Cove at El Niguel, Rough Grading Plan, 30667 Crown Valley Parkway, Laguna Niguel, California,” prepared by American Geotechnical, Inc., dated May 22, 2023; (2) “Geotechnical Review of Verdura Retaining Wall Plans and Design Report dated June 26, 2023, The Cove at El Niguel, 30667 Crown Valley Parkway, Laguna Niguel, California,” prepared by American Geotechnical, Inc., dated June 27, 2023; (3) Construction Plans for the Improvement of The Cove - Residential Development, Rough Grading Plan, prepared by Blue Engineering and Consulting, Inc., print dated May 23, 2023; (4) Construction Plans for the Improvement of The Cove - Residential Development, Precise Grading Plan, prepared by Blue Engineering and Consulting, Inc., print dated May 23, 2023; (5) Verdura Retaining Wall Plans, The Cove at El Niguel, prepared by Soil Retention Designs, Inc., dated June 26, 2023; (6) Verdura Retaining Wall Design, The Cove at El Niguel, prepared by Soil Retention Designs, Inc., dated June 26, 2023.

REFERENCES (SP16-04): See Page 3.

ACTION:

RECOMMENDED APPROVAL OF DOCUMENT(S) SUBMITTED

CONDITIONAL APPROVAL OF DOCUMENT(S) SUBMITTED

X REQUEST ADDITIONAL DATA FOR REVIEW – See COMMENTS.

Please send responses directly to the City of Laguna Niguel, Building Department.

GMU Geotechnical can only accept responses forwarded from the City.

DISTRIBUTION: Amber Gregg, Daniel Kesicbasian, City of Laguna Niguel (email) Grant Keene, WJK Development Co., Applicant (email)
Jerry Huang, American Geotechnical, Inc. (email)
593

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513 x Fax: (949) 888-1380 x email: [email protected] Page 2 REFERENCE NO.: G23-0009 DATE: August 3, 2023

COMMENTS

1. Section DR-DR' of Plate 2 of the rough grading plan review report indicates that for the short term, the toe of the existing westerly ascending gravity buttress fill will be removed during the proposed 5-foot-deep over-excavation of the building pad and for the long-term will be partially removed when the pad is brought down to a lower grade using a retaining wall. Therefore, address the temporary stability of the slope at this location during the over-excavation of the site and address the long-term stability of the slope with the grade lowered by the retaining wall.

Provide supporting temporary and long-term stability calculations, as necessary.

2. In a similar manner, please address the temporary stability of the westerly ascending slope at the location of Section G-G during the over-excavation of the site and the temporary stability of the northerly ascending slope at the northern end of Section E-E' during the over-excavation of the site and the construction of the proposed tiered retaining walls. Provide supporting temporary stability calculations, as necessary.

3. Please review the precise grading plans, including the MSE wall plans, after they have been revised to satisfy the first round of plan check comments. Provide a summary of the review and provide any additional or revised geotechnical recommendations, as necessary.

4. Please provide updated monitoring results (including inclinometers within the property).

5. Please coordinate with the civil engineer to show all corrective grading on the civil sections.

6. Please provide the laboratory testing program for the MSE wall backfill, including types of testing and frequency. This testing program should be added to the MSE wall plans as a note.

7. Please provide discussion and supporting data for the shear strengths used in the MSE wall backcut stability analysis.

8. Per Condition of Approval 14 of Resolution 22-15, a series of slope inclinometers shall be installed on the slope (i.e., gravity buttress toe) and monitored during construction. Please provide recommendations for installation, including locations and depths.

REVIEWED BY: _______________________________________________________________ Lisa Bates, PG, CEG 2293 David Hansen, M.Sc., PE, GE 3056 Associate Geologist Associate Engineer
594

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513 x Fax: (949) 888-1380 x email: [email protected] Page 3 REFERENCE NO.: G23-0009 DATE: August 3, 2023
REFERENCES (SP16-04): (1) “Geotechnical Review of Tentative Tract Map, Tenatative Tract No. 17721, The Cove at El Niguel, 30667 Crown Valley Parkway, Laguna Niguel, California,” prepared by American Geotechnical, Inc,. dated January 8, 2021; (2) Tentative Tract Map No. 17721, The Cove at El Niguel, 30667 Crown Valley Parkway, Laguna Niguel, prepared by Hunsaker & Associates Irvine, Inc., dated January 21, 2021; (3) “Response to City of Laguna Niguel Geotechnical Review Sheet Dated February 15, 2021 and Notice of Incompleteness dated February 23, 2021, Tenatative Tract No. 17721, The Cove at El Niguel, 30667 Crown Valley Parkway, Laguna Niguel, California,” prepared by American Geotechnical, Inc,. dated April 2, 2021; (4) “Addendum Report – Adding Geology to Current Site Plan, The Cove at El Niguel, 30667 Crown Valley Parkway, Laguna Niguel, California,” prepared by American Geotechnical, Inc,. dated April 2, 2021; (5) “Comments to Slope Monitoring Report No. 6 by David H.

Lee and Associates dated November 27, 2022, The Cove at El Niguel, 30667 Crown Valley Parkway, Laguna Niguel, California,” prepared by American Geotechnical, Inc,. dated November 30, 2022; (6) “Monitoring Report No. 6 for the Slope Inclinometers Installed within the Niguel Summit Landslide Stabilization Area, Laguna Niguel, California,” prepared by David H. Lee & Associates, Inc., dated November 27, 2022.

595
596
597
598

FEES INCURRED
ATTENTION: Engineering Department, City of San Clemente PROJECT/PERMIT NO.: ENG22-181
CITY W.O. NO.: 400767-00-69-056
ACCOUNT NO.: 001-000-21512
VENDOR NO.: 015195
PROJECT ADDRESS: 2421 Calle Frontera
SERVICE TYPE: Geotechnical Review
Document(s) Reviewed Date of
Review Sheet
Status of Review Charge
(1) “Geotechnical Investigation, Memory Care
and Assisted Living Development, Intersection
of Calle Frontera and Calle Ola Verde, San
Clemente, California,” prepared by Geocon
West, Inc., dated June 16, 2022; (2) Precise
Grading Plans, San Clemente Memory
Care/Assisted Living, prepared by David Evans
and Associates, Inc., dated June 6, 2022.
7/20/2022 NOT APPROVED $ 1,560.60
599

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 1 REFERENCE NO.: G24-1001 DATE: November 19, 2024
PROJECT DESCRIPTION: Proposed Residential Development Rough Grading ____________________ LOCATION: 2 Hombre de Guerra, VTTM 17433 ____________________________________________ APPLICANT/OWNER: Charles Mallon for Euland Capital Enterprises ___________________________ GEOTECHNICAL FIRM: GeoTek, Inc.____________________________________________________ THEIR JOB NO.: 3782-SD ______________________________________________________________ GEOTECHNICAL ENGINEER: Russell C. Lamb, GE 2207____________________________________ ENGINEERING GEOLOGIST: Christopher D. Livesey, CEG 2733______________________________ DOCUMENT(S) REVIEWED: (1) “Preliminary Geotechnical Evaluation and Rough Grading Plan Review for SunPointe Development, 2024 Vesting Tentative Tract Map 17433, Laguna Niguel, California,” prepared by GeoTek, Inc., dated August 16, 2024; (2) Rough Grading Plan, TTM 17433, Sunpointe, prepared by Hunsaker & Associates, Inc., print date October 16, 2024.

REFERENCES (SP12-007): Page 9.

ACTION:

RECOMMENDED APPROVAL OF DOCUMENT(S) SUBMITTED

CONDITIONAL APPROVAL OF DOCUMENT(S) SUBMITTED
X REQUEST ADDITIONAL DATA FOR REVIEW – See COMMENTS.

Please send responses directly to the City of Laguna Niguel, Grading Department.

GMU Geotechnical can only accept responses forwarded from the City.

DISTRIBUTION: Daniel Kesicbasian, Katie Crockett, Kyle Webber, City of Laguna Niguel (email) Charles Mallon for Euland Capital Enterprises, Applicant (email) Geotek, Inc. (email)
600

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 2 REFERENCE NO.: G24-1001 DATE: November 19, 2024

COMMENTS

1. Geotechnical Map (Plate 2)
a. Show and label existing slope drains (hydroaugers) and permanent outlet devices. b. Show limits or delineate area of FS<1.5 near south end of “C” Drive (cross section F2). c. Show limits or delineate area of FS<1.1 where seismic deformation analysis applies (cross section A).

2. Geotechnical Cross Sections (general):
a. Show currently proposed rough grading and previously entitled grades from the SP12-007 conditional approval in April 2021.
b. Show remedial grading to be consistent with text of report, slope stability analyses, and Geotechnical Map. There are numerous instances where remedial grading shown on the sections does not coincide with text, analysis, and/or the map. c. Label backcut and frontcut inclinations on remedial grading and keyways. d. Label all keyway dimensions (depth and width).
e. Show MSE walls on all cross sections where applicable. f. Show proposed subdrain/backdrain systems at top of lime treatment areas.

3. The descriptions of artificial fills on Pg. 8 of report are not consistent with the Geotechnical Map explanation. In addition, artificial fills associated with existing development to the north are described in the wrong section on Pg. 8 of report. Please revise to include in “Afo” section of report to be consistent with Geotechnical Map.

4. Alluvium/colluvium is given symbol “Qac” in text of report and Geotechnical Map Explanation, but symbol “Qal” on Geotechnical Map. Please revise to be consistent. Also please indicate on Pg. 9 of report if these soil materials are considered suitable or not for support of the planned grading.

5. GeoTek appears to conclude that slope drains do not affect the underlying groundwater conditions (pg. 12), which is in contrast with prior studies by SMC and Earth Forensics. If this is the case, please discuss and reconcile this discrepancy with supporting data and analysis.

6. Offsite landslides and surficial slumps are described to the west/uphill from the proposed development. Pg. 11 of report indicates that similar landslide features to the south of the site occurred as “fluid (mudflow)” failures. Describe, analyze, and quantify the potential for similar failures on the westerly slope, along with mitigation measures for protecting the streets and homes at the toe of this slope.

7. Settlement: Please address settlement/subsidence/compressibility of the underlying landslide debris when subjected to the loading from proposed fills (including settlement magnitude, time duration, etc.). Provide quantitative evaluation or technical justification. 601

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 3 REFERENCE NO.: G24-1001 DATE: November 19, 2024
COMMENTS (continued)

8. Slope Stability (general):
a. Stability analyses was performed for overall global stability of the site; however, additional stability analysis needs to be performed for each interior slope shown on the cross sections to confirm the size and depth of proposed interior keyways and buttresses, etc. The search windows should be narrowed to specifically evaluate each interior slope. b. Add/incorporate specific Qls rupture surfaces shown on the cross sections in the stability analyses. Numerous rupture surfaces are shown on the cross sections and these need to be analyzed with adopted strengths of 12.5 degrees friction and 250 psf cohesion. It should be clear that the rupture surfaces on the maps/sections were evaluated for stability. c. For translational/block stability analyses, submitted analyses do not follow geologic structures (i.e., rupture surfaces do not run along landslide rupture surfaces or relic bedding orientations). Please search for various failures along specified landslide rupture surfaces and relic bedding orientations (i.e., along-bedding) using the rupture surface shear strengths. Block searches should be set up in a manner that searches for likely/reasonable failure surfaces which are governed by geologic conditions such as rupture surface and/or geologic structure. Deep seated landslide analyses should be consistent with prior analyses prepared by SMC as part of the entitlement phase of the project. d. Pg. 22 of the report states that temporary front and backcut inclinations of 1:1 were analyzed. This is not consistent with front and backcuts shown on the cross sections. Please reconcile sections and analyses.

9. Strength model:
a. For revised shear strength for across-bedding condition in landslide block, Figure 4.7.2-4 is discussed on Pg. 17 of report, but figure is missing. b. Provide further and specific justification for increasing the cohesion values for landslide block, along and across bedding.

10. Cross Section A:
a. The recommended buttress widths and depths in the text do not match the cross section or Plate 8.
b. Deformation analysis: Show zone of seismic FS<1.1 on Geotechnical Map and clarify which Lot(s) this condition applies to. Seismic FS<1.1 does not meet City of Laguna Niguel standards and will therefore require a deviation request. c. Lime treatment area is very close to slope face. Please confirm if this is recommended and justify.
602

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 4 REFERENCE NO.: G24-1001 DATE: November 19, 2024
COMMENTS (continued)
d. For the groundwater rise scenario: The evaluation should consist of computing safety factors for a realistic potential rise in groundwater with the current dewatering and maintenance requirements. The safety factor for this case should be a minimum 1.5.

Potential groundwater rise scenario should be justified/supported by data such as seasonal high groundwater after multiple wet winters, and/or high groundwater levels from consultant’s groundwater monitoring.

11. Cross Section A2:
a. The recommended fill width and depth in the text do not match Plate 8.

12. Cross Section B:
a. The recommended buttress widths and depths in the text do not match the cross section or Plate 8.
b. Lower keyway excavation extends below the water table. Please describe anticipated conditions for wet removals, temporary stability, etc. for this area.

13. Cross Section C:
a. The recommended buttress widths and depths in the text do not match the cross section or Plate 8.

14. Cross Section D:
a. The recommended buttress elevation and lime treated fill bottom elevation do not match the cross section or Plate 8.
b. Lime treatment area is very close to slope face. Please confirm if this is recommended and justify.
c. Please analyze temporary stability of western backcut and adjacent remedial grading which undercuts the base of QlsA.
d. Backcut near center of section is roughly 50-ft high 1:1 backcut in landslide material.

Please revise or justify temporary stability with analysis.

15. Cross Section E:
a. The recommended buttress widths and depths in the text do not match the cross section or Plate 8.

16. Cross Section F:
a. Provide further justification for 10-ft setback or revise as necessary. 10-ft setback doesn’t meet CBC minimum slope setback requirements unless deepened foundations are planned.

Show resulting setback on Geotechnical Map and grading plans. 603

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 5 REFERENCE NO.: G24-1001 DATE: November 19, 2024
COMMENTS (continued)

17. Cross Section F2:
a. Show zone with FS<1.5 on Geotechnical Map and confirm that this area does not intersect building pads and street. Also show recommended setback zone on Geotechnical Map.

18. Cross Section G:
a. The recommended buttress widths and depths in the text do not match the cross section or Plate 8.
b. Please analyze temporary stability of western backcut and adjacent remedial grading which undercuts the base of QlsG and QlsA.

19. Cross Section H:
a. Please correct line types and labels for existing ground and proposed grade. b. Analyses need to prove that static and pseudostatic safety factors meet code minimums within the site (i.e., show FS>1.5 and 1.1 within the development slopes/streets/lots). c. Report describes offsite FS<1.0 for seismic analysis, whereas the stability analyses indicate FS<1.0 for static and seismic conditions. Please discuss/clarify.

20. Cross Section H1:
a. Cross Section H1 is missing from report. Please provide. b. Analyses need to prove that static and pseudostatic safety factors meet code minimums within the site (i.e., show FS>1.5 and 1.1 within the development slopes/streets/lots).

21. Cross Section J:
a. Revise remedial grading to illustrate remedial grading below entire fill area per the report text.

22. Cross Section K:
a. Label underlying geologic formation (QlsD).

23. Cross Section L:
a. Revise remedial grading to illustrate removal of all artificial fill (Afo) per the report text.

24. Cross Section M:
a. Revise remedial grading to illustrate removal of all artificial fill (Afo) per the report text.

25. Cross Section N:
a. Revise remedial grading to illustrate removal of all artificial fill (Afo) per the report text.

26. Cross Section A2:
a. Clarify contact between Afo and QlsC.
604

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 6 REFERENCE NO.: G24-1001 DATE: November 19, 2024
COMMENTS (continued)

27. Lime Treatment of Soils:
a. Discuss effects of permeability of lime-treated soils on groundwater migration. b. Given that lime treatment is shown extending at or near slope face in several areas, discuss impacts on slope maintenance, slope landscaping, slope irrigation, slope drainage, etc. c. Report Pg. 21 indicates average sulfate content and concludes “Low concern”. However, some samples (and presumably some portions of the site) have “Moderate concern”. Do low concern and moderate concern still present a concern for swell potential? Please provide clear conclusions and recommendations for mitigation to avoid swell given the site conditions.
d. Further describe placement of subdrain system on top of lime treatment zones and drainage of these zones to areas that will be able to receive perched groundwater. These zones need to be placed deep enough to allow drains on top and not be in conflict with utilities, MSE walls, building foundations, etc.
e. Provide clear conclusions that the recommended lime treatment will not have any adverse impact to site stability, groundwater migration, heave/swell, etc.

28. MSE Walls:
a. Show proposed MSE walls on all sections where they occur. b. Provide global stability analyses for MSE walls.
c. MSE walls occur as part of Rough Grading and therefore need to be addressed with final design details, including full design recommendations and geotechnical, civil, and structural design plans.

29. Buried Pier Wall: Given that the proposed Rough Grading and related slope stability is dependent on the buried per wall for stability, full design details and plans will be required as part of Rough Grade permit application. Include geotechnical, civil, and structural design plans and specifications.

30. Inclinometers:
a. Inclinometer recommendations should be incorporated into text of report rather than within the Groundwater Monitoring Appendix E.
b. Recommendations were provided for northern inclinometer but were not provided for western inclinometer. Please provide details for western inclinometer. c. Show inclinometers on cross sections D and K.

31. Western Slope Gradient: Slope proposed at 1.7:1 to 1.8:1 inclination will need to have a request to deviate from City standards. Provide surficial stability calculations to justify slope steeper than 2:1.

Provide recommendations for mitigation, as necessary.
605

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 7 REFERENCE NO.: G24-1001 DATE: November 19, 2024
COMMENTS (continued)

32. Subdrains:
a. Eastern subdrain system ends at a low point with no connection to the outlet. Please clarify recommendation.
b. Subdrain system shows “outlet to be determined”. Please clarify recommendations to confirm feasible outlet location.

33. Temporary Excavations:
a. Report describes maximum 20-ft high slopes which will not work with the proposed keyway elevations. Please clarify.
b. Construction sequence for westerly buttress indicates 100-ft vertical excavation which is not consistent with cross sections or stability analysis. Please reconcile text, map, sections, and stability analyses.
c. Construction sequence for westerly buttress indicates ramps to be no steeper than 3:1.

Flatter ramps would expose more backcut, which is undesirable. Please clarify if recommendation is to have ramps no flatter than 3:1.

34. Shrink/Bulk: Provide detailed estimation of shrink and bulk quantities (CY) to assist the project civil engineer in designing a balanced site with reduced import/export. Volume estimate should be provided in geotechnical report and Rough Grade plans.

35. Setbacks: Applicant should review setback criteria and confirm the intended future housing will be feasible with the required setbacks which can be up to 40-ft high for tall descending slopes.

36. Retaining Wall Design:
a. Provide quantification to show if there will be enough crushed misc. base generated onsite to satisfy the wall backfill volume needed. Or clarify if additional select fill will need to be imported.
b. Use of CMB derived from existing asphalt may not be suitable for placement as a drainage material behind retaining walls due to environmental concerns. Please clarify recommendations.
c. Please justify revised design parameters that appear high based on the onsite soil engineering characteristics (passive pressure, coefficient of friction, earth pressures).

Provide calculations to justify the parameters.
d. Seismic pressure indicates level backfill. Please clarify if this applies to both sloping and level backfill, since sloping backfill conditions exist onsite.

37. Seismic Design Parameters: Please justify change to Site Class C. On-site soil and geologic conditions are more appropriately characterized as D.
606

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 8 REFERENCE NO.: G24-1001 DATE: November 19, 2024
COMMENTS (continued)

38. Rough Grade plans shall include geotechnical features presented by GeoTek, such as remedial grading quantities, shrink/swell quantities, keyways, lime treatment zones, buried pier wall, inclinometers, monitoring well, hydro-augers, subdrains/outlets, etc.

39. Volumetric Comparison Map: Earthwork comparison map should compare currently proposed grades vs. the grades used for entitlement review and conditional approval in April 2021.

40. Items Not Reviewed: The following items are not a part of Rough Grading and are therefore not reviewed (Not A Part): Post-tension foundation design, under-slab moisture membrane, misc.

Foundation and slab recommendations, foundation setbacks, seismic design, pavement design, flatwork design, etc.

REVIEWED BY: ______________________________________________________________________ Aron R. Taylor, M.Sc., PG, CEG 2455 David Hansen, M.Sc., PE, GE 3056 Principal Geologist Associate Engineer
REVIEWED BY: ______________________________________________________________________ Lisa Bates, PG, CEG 2293 Greg Silver, M.Sc., PE, GE 2336 Associate Geologist Principal Engineer
___________________________
Aron R. Taylor, M.Sc., PG, CE
___________________
Greg Silver, M.Sc., PE,
rincipal Engineer
607

CITY OF LAGUNA NIGUEL
30111 Crown Valley Parkway
Laguna Niguel, California 92677
Phone (949) 362-4300 | Fax (949) 362-4340

GEOTECHNICAL REVIEW SHEET
Reviewed by:

GMU GEOTECHNICAL, INC.
30336 Esperanza
Rancho Santa Margarita, CA 92688
(949) 888-6513  Fax: (949) 888-1380  email: [email protected] Page 9 REFERENCE NO.: G24-1001 DATE: November 19, 2024
REFERENCES (SP12-007):

1. “Geotechnical Feasibility Review, SunPointe, Tentative Tract Map 17433, Southwest of Avenida del Caballo, Laguna Niguel, California,” by Stoney-Miller Consultants, Inc., dated August 21, 2014.

2. “Feasibility Investigation/Review of 50-Scale Map Uunpointe, Tentative Tract 17433 Colinas Sur, Laguna Niguel, California,” by Stoney-Miller Consultants, Inc., dated October 9, 2014 (Revised February 17, 2015).

3. “Response to City of Laguna Niguel, Geotechnical Review Sheet, dated March 20, 2015, SunPointe, Tentative Tract 17433, Colinas Sur, Laguna Niguel, California,” by Stoney-Miller Consultants, Inc., dated April 24, 2015.

4. “Geotechnical Review of 2019 Vesting Tentative Tract Map, SunPointe, Vesting Tentative Tract 17433, Colinas Sur, Laguna Niguel, California,” by Stoney-Miller Consultants, Inc., dated August 29, 2019.

5. “Response to City of Laguna Niguel Verbal Review of: Geotechnical Review of 2019 Vesting Tentative Tract Map, SunPointe, Vesting Tentative Tract 17433, Colinas Sur, Laguna Niguel, California,” by Stoney-Miller Consultants, Inc., dated October 9, 2019.

6. “Response to City of Laguna Niguel Review of: Supplemental Geotechnical Investigation, Groundwater and Slope Stability Evaluation, 2019 Vesting Tentative Tract Map, SunPointe, Vesting Tentative Tract 17433, Colinas Sur, Laguna Niguel, California,” by Stoney-Miller Consultants, Inc., dated March 31, 2021.
608
APPENDIX A-2
GMU Fee Sheet Form
609

FEES INCURRED
ATTENTION: Engineering Department, City of San Clemente PROJECT/PERMIT NO.: ENG24-081
CITY W.O. NO.: N/A
ACCOUNT NO.: 001-411-43535
VENDOR NO.: 015195
PROJECT ADDRESS: 12 Mar del Rey
SERVICE TYPE: Geotechnical Review
Document(s) Reviewed Date of
Review Sheet
Status of Review Charge
(1) “Preliminary Geotechnical Investigation
Report, Proposed Single-Family Residence, 12
Mar del Rey, San Clemente, California,”
prepared by GeoMat Testing Laboratories, Inc.,
dated February 13, 2024; (2) Structural
Calculations, 12 Mar del Rey, prepared by David
York, Architect, dated March 11, 2024; (3)
Grading Plan, 12 Mar del Rey, prepared by
David York, Architect, undated.
4/2/24 NOT APPROVED $ 1,560.60
“Response to City Review Sheet Dated April 2,
2024, Preliminary Geotechnical Investigation
Report, Proposed Single-Family Residence, 12
Mar del Rey, San Clemente, California,”
prepared by GeoMat Testing Laboratories, Inc.,
dated April 4, 2024.
6/21/24 CONDITIONALLY

APPROVED
No Charge
610
APPENDIX A-3
City Handouts Developed by GMU
611
612
613
614

APPENDIX B
GMU Resumes
615
30336 Esperanza, Rancho Santa Margarita, CA 92688 | ph: 949.888.6513 | fax: 949.888.1380 | web: www.gmugeo.com LISA L. BATES, PG, CEG
Associate Geologist
Director of Municipal Geotechnical and Engineering Services

PROFESSION
Engineering Geologist

REGISTRATIONS
Certified Engineering Geologist,
State of California
Professional Geologist,
State of California

CERTIFICATIONS
Qualified SWPPP Practitioner,
State of California
Qualified SWPPP Designer,
State of California

EDUCATION
B.S., Geological Sciences,
University of California, Santa
Barbara
Summer Field Studies, Oregon
State University

AFFILIATIONS
National Association of Women In
Construction, Orange County
Chapter – Past Chapter President
(NAWIC)
South Coast Geological Society
Lisa has over 26 years of experience in various aspects of the geotechnical field. She has worked successfully with
homeowners’ associations, residential and commercial
developers, master community planners, and governmental agencies on both private and public works projects. She has extensive experience in a wide variety of projects including:
residential and commercial development, public works
projects, hillside grading, landslide investigation and mitigation, and forensic investigations. Ms. Bates excels at landslide and slope failure investigations and repairs, and has worked with many homeowners’ associations on slope issues.

In addition, she has served as an expert witness for several legal matters. She is also the Reviewing Geologist for several public agencies. Her goal is to provide an outstanding product to her clients in a timely and cost efficient manner, while upholding the high standards and mission of GMU. Selected project categories representative of Ms. Bates’ experience are
described below:
x Landslide/Slope Failure Investigation and Repair
x Construction Management
x Geotechnical Review/Consulting Services for Multiple
Cities
x Public Works Projects
x Fault Studies
x Legal Consultation
x Residential/Commercial Projects
x Single Family Residential Custom Developments
Additional information and notable projects from Lisa’s portfolio are summarized on the following pages.
616
Lisa L. Bates 2

LANDSLIDE/SLOPE FAILURE INVESTIGATION AND/OR REPAIR
Ms. Bates’ experience investigating and/or repairing landslides, slope failures, and erosion includes dozens of projects. The list below includes highlights of her project experience, including high-profile or complex landslides.
x Hacienda Road, La Habra Heights - City of La Habra Heights: Project included geotechnical investigation of a portion of roadway with steep natural slopes and existing distress. Investigation included large and small diameter borings, installation and monitoring of a slope inclinometer, geologic analyses, and development of repair options. Project also included development of design repair plans and specifications, as well as coordination with bidders and impacted agencies. x Poppy Trail Landslide, Rolling Hills – California Joint Powers Insurance Authority: Project included geotechnical investigation and design of repair of a large landslide within a hillside residential area.

Challenges included steep terrain, adjacent properties, and complex geology. Duties included geologic investigation and grading observations, project oversight, and construction management advisor services.
x Philemon Landslide, Dana Point – Private Developer: Project included geotechnical investigation and design of repair of a landslide impacting four residential structures. Challenges included existing residences and adjacent properties, adverse geologic structure, and poor shear strengths for onsite soils.

Repair design included innovative slurry backfill of keyway excavation. Duties included geologic investigation, project oversight, and grading observations. Project won 2014 CalGeo Project Award and was presented at 2013 Geo-Congress in San Diego.
x Horseshoe Landslide, Anaheim Hills – Homeowners Association: Project included emergency geotechnical services after re-activation of ancient landslide within developed area. Duties included geotechnical investigation, construction management advisor services, long-term monitoring, groundwater monitoring, development of repair plan, coordination with the Association and their legal counsel, and communication with public agencies. Landslide is underlain by complex geology, and crosses City boundary.
x Portuguese Bend Landslide Complex, Rancho Palos Verdes – Various Clients: Multiple projects within the ancient landslide complex included investigations of:
o Active Portuguese Bend Landslide
o “Parcel 4” Landslide
o Abalone Cove Landslide
Tasks included coordinating complex geologic field investigations with multiple drilling methodologies, analyzing data collected to prepare maps and geologic cross-sections, creation of a structure contour map of the entire landslide complex, and development of mitigation measures to stabilize the landslides.
x South Shores Landslide, Rancho Palos Verdes – Harris & Associates: Project included study of the inactive landslide’s potential impact on a new storm drain system, including large diameter and continuous core drilling, analyses, and development of conceptual designs. 617
Lisa L. Bates 3

CONSULTANT TO PUBLIC AGENCIES
Lisa has over 26 years’ experience working with various governing agencies, including 20 years providing on-call geotechnical services to a variety of agency clients. A chronological list of Ms. Bates’ experience is described below:
x City of Aliso Viejo (2011 to 2012):
o Construction Observation
o Emergency Services (Slope Failures)
x City of Rancho Santa Margarita (2008 to current):
o Development Reviews
o Geotechnical Investigation and Design
x City of Laguna Niguel (2002 to current):
o Development Reviews (Building, Grading, and Planning/Entitlement) o Geotechnical Investigation and Design
o Construction Observation
o Emergency Services (Landslides, Public Safety, “Red Tagging”, etc.) o Geotechnical Monitoring
x City of Chino Hills (2002 to current):
o Development Reviews (Building, Grading, and Planning/Entitlement) o Geotechnical Investigation and Design
o Construction Observation
o Emergency Services (Landslides, Public Safety, etc.)
o Geotechnical Monitoring
x City of Dana Point (2008 to current):
o Geotechnical Investigation and Design
o Construction Observation
o Emergency Services (Slope Failures, Blufftop Failures, Public Safety, etc.) o Geotechnical Monitoring
x City of Laguna Hills (2010 to 2020):
o Development Reviews (Grading, Planning, and Entitlement) o Geotechnical Investigation and Design
x City of Mission Viejo (2016 to current):
o Development Reviews (Engineering)
o Geotechnical Investigation and Design
o Construction Observation
o Emergency Services (Landslides, Public Safety, etc.)
o Geotechnical Monitoring
x City of Anaheim (2021 to current):
o Development Reviews (Engineering)
618
Lisa L. Bates 4
x City of Laguna Beach (2022 to present):
o Development Reviews (Hydrology and WQMP)

RESIDENTIAL/COMMERCIAL DEVELOPMENT
x Cielo Vista Residential Development, County of Orange – Residential development planned on undeveloped land required fault studies, geotechnical investigation, and foundation investigation for entrance bridge. Tasks included developing recommendations for rough grading, retaining wall, bridge, and residential structure design and providing design input during plan preparation. Provided project management for structural design of retaining and MSE walls. Project required approval from MWD for geotechnical impacts to existing Lower Feeder pipeline, involving detailed analyses, multiple meetings with MWD staff, and coordination of responses to MWD requirements and comments.

Project is currently under construction, with GMU providing geotechnical observation and testing, materials testing, and Special Inspection services, as well as vibration monitoring services. x Talega, San Clemente – Geotechnical investigation and geotechnical design recommendations for master planned community, including landslide and slope stability mitigation for hillside development.

Investigation included drilling and logging numerous bucket auger and hollow stem borings. x Geotechnical Investigation, Grading & Observations, Rancho Mission Viejo/DMB Ladera, LLC, Ladera Ranch – Geotechnical investigation and grading/construction observations of 8000+ unit master planned community. Tasks include drilling numerous bucket auger and hollow stem borings and geologic mapping and observation during mass and rough grading.

PUBLIC WORKS PROJECTS
x Lower Curtis Park Expansion Project, City of Mission Viejo – Geotechnical investigation for proposed park expansion to include 4 new sports fields and associated improvements. Project included study of multiple large landslides and impacts of proposed development on landslide stability. Project is currently under construction, including landslide removal, mass grading, and import of over 1 million cubic yards of fill soil.
x Tier 1, Tier 2, and Tier 3 Improvement Projects, Crown Valley Community Park, City of Laguna Niguel – Three phases of improvements at the City’s largest park included: New tot lot, splashground, amphitheater, parking lots, bridge, and community building, as well as retaining walls, and other nonstructural elements. Scope included geotechnical investigations and design support for these improvements, as well as construction geotechnical observations, testing, special inspection, nondestructive testing, and materials testing. x La Pata Avenue Gap Closure, South, County of Orange – Geotechnical investigation for proposed alignments of widening and extension of La Pata Avenue from Ortega Highway to San Clemente.

Project included study of multiple large landslide complexes, fault alignments, and complex geology. x La Pata Interim Widening for New High School, San Juan Capistrano – Capistrano Unified School District: Project included geotechnical investigation and construction observation during widening and re-paving of existing roadway.
x Reclaimed and Domestic Water Reservoirs, City of Chino Hills – Geotechnical investigation for proposed water reservoirs in semi-developed areas. Project included subsurface investigation for reservoir sites and access roadways as well as review of proposed plans. Scope during construction of 619
Lisa L. Bates 5
reservoirs included geotechnical observation and testing, and special inspection. x Dana Point Harbor, City of Dana Point – Geotechnical investigation for redevelopment of existing harbor facilities, including new parking structure, retail, restaurants, boat storage and supporting improvements.
x Long Beach Sports Park, Long Beach – Geotechnical investigation for planned recreational sports complex including artificial turf soccer and baseball fields, clubhouse/concessions, office building and skate park to be constructed on property used for oil field operations and debris disposal. Project included complex investigation to evaluate buried alluvial channel and marshland overlain by debris and fill soils, and development of geotechnical recommendations for corrective grading and design of structures.
x Sports Park, Chino Hills, City of Chino Hills – Project included geotechnical investigation, input on design, and construction observations during rough and precise grading, including paving and construction of artificial grass fields.
x City Hall, City of Laguna Niguel – Geotechnical investigation for proposed City Hall site on existing graded area. Project included subsurface investigation, design support, and grading observations. x Portuguese Bend Beach Club, Rancho Palos Verdes – Army Corps of Engineers: Geotechnical investigation for proposed seawall and buttress at toe of active Portuguese Bend landslide.

Investigation included design and analysis of alternative methods to preserve coastal environment. x Government Center, City of Chino Hills – Geotechnical investigation, design recommendations, plan review, and observation of construction of new civic center. Center includes new parking structure, City Hall, fire, and police buildings as well as residential development. x Ortega Highway (State Route 74) Widening between San Juan Creek and Orange/Riverside County Line, Orange County, Private Contractor – Project included providing on-call geotechnical services to general contractor, including evaluation of temporary slope stability in hard rock and rock fill.

FAULT STUDIES
x Cielo Vista Residential Development, County of Orange, North County BRS Project, LLC – Supplemental fault study of site crossed by Whittier Fault. Included excavation and detailed logging of over 500 feet of trench. Fault study analyses methodologies included fracture mechanics, physical characteristics, geomorphology, and datable sediments. Fault study reviewed and approved by County of Orange as part of development approval.
x The Ranch Plan, Orange County – Rancho Mission Viejo: Fault investigation of Mission Viejo fault located within proposed development bubble.
x Seacliff Shopping Center, Huntington Beach - Shea Homes: Fault investigation of branch of Newport-Inglewood fault zone located within Alquist-Priolo Earthquake Studies Zone for proposed shopping center. Investigation included extensive trenching and design review. x Hoag Hospital, Newport Beach - Hoag Hospital: Fault investigation of Newport-Inglewood fault zone and observation during grading of additional parking area and proposed structures. 620
Lisa L. Bates 6
x Foothill Transportation Corridor, CP Alignment, Orange County - Transportation Corridor Agencies: Fault investigation of branch of Cristianitos fault crossing proposed toll road alignment.

LEGAL CONSULTATION
Ms. Bates has provided geotechnical consultation for litigation on a variety of projects for over 17 years in the State of California. She has been deposed, testified at trial, and participated in mitigation for several cases, including the following issues:
x Landslides
x Slope failure
x Construction dispute
x Slope repair
x Concrete type/source
PUBLICATIONS:

Silver, Gregory, Bates, Lisa, 2012, “Landslide Stabilization Using High Strength Aggregate-Cement Slurry”.
621
30336 Esperanza, Rancho Santa Margarita, CA 92688 | ph: 949.888.6513 | fax: 949.888.1380 | web: www.gmugeo.com

DAVID HANSEN
Senior Geotechnical Engineer

PROFESSION
Registered Civil Engineer
Registered Geotechnical Engineer

EDUCATION
B.S. Geological Engineering,
University of Arizona, Tucson
M.S. Civil Engineering, California State
University, Long Beach

AFFILIATIONS
American Society of Civil Engineers
(ASCE)
Dave has over 35 years of progressively responsible positions, from Field Soils Technician to Senior Associate Engineer and Project Manager. He has managed and completed
multiple projects on time and on budget. Dave is experienced with planning, implementing, and supervising geotechnical, percolation and landslide investigations. He is also experienced in residential distress evaluations for a wide variety of residential and commercial projects ranging from single lots to large scale mass-grading projects and master planned communities. He has helped develop tools and methods for estimating project costs, preparing proposals, and tracking project budgets. He has provided services to a wide range of clients including
homeowners, homeowner’s associations, developers, architects, and water and school districts throughout Southern California.

He is also very knowledgeable in local and state regulations and building codes in providing third-party review and technical advice for the Building Departments of several Southern California cities.

Technical abilities include:
x Settlement Evaluation
x Design of Earth Retention Systems
x Shallow and Deep Foundation Design Recommendations
x Slope Stability Analysis
x On-site Sewage Absorption System Design
x Storm Water Infiltration Analysis
x Liquefaction Analysis
x In-situ Ground Improvement and Modification Techniques x Pile Analysis and Design
x Shoring Recommendations
x Pavement Design
x Landslide Stabilization
x Seawall Design
622
David Hansen 2

GEOTECHNICAL ENGINEERING
RESIDENTIAL DEVELOPMENT PROJECTS/MASTER PLANNED COMMUNITIES:
• Moulton Ranch, Brock Homes, Nellie Gail, Laguna Niguel, CA – Project Geotechnical Engineer – Geotechnical investigation and design for residential tract (400+ homes, park sites)
• San Joaquin Hills Residential Development, S&S Development, Laguna Niguel, CA – Project Geotechnical Engineer – Geotechnical investigation and design for residential tract (500+ homes, recreation centers, park sites)
• Alberhill Ranch, Castle & Cooke Development, Lake Elsinore, California CA – Lead Geotechnical Engineer - Geotechnical investigation and design for major master planned community (1200+ homes, water reservoirs, recreation centers, park sites), geotechnical engineering issues such as hard rock, blasting, and rock fall issues. • Bridlewood Estates, Avalon Homes, Yorba Linda, CA - Lead Geotechnical Engineer – Oversight of geotechnical engineering for rough and precise grading and residential development, (400+ homes, recreation centers, park sites), geotechnical engineering issues such as landslide mitigation and highly expansive and corrosive soils. • Sierra Peak, Capital Pacific Homes, Corona, CA - Lead Geotechnical Engineer – Geotechnical investigation and design for rough and precise grading and residential development (450+ homes, recreation centers, park sites), geotechnical engineering issues such as landslide mitigation, rockfall, and geogrid-reinforced slopes. • Amalfi Hills Residential Development, S&S Development, Yorba Linda, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and residential development (600+ homes, recreation centers, park sites), geotechnical engineering issues such as landslide mitigation and highly expansive and corrosive soils. • Aurora, William Lyon Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (90 attached homes, pocket parks). • Aubergine, TriPointe Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (66 detached homes, pocket parks). • Aria, Phases 1 and 2, Tri-Pointe Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer – Geotechnical investigation and design for precise grading and residential development (151 attached homes, pocket parks). 623
David Hansen 3
• Viridian, Tri-Pointe Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (72 detached homes, pocket parks). • MR-18, Warmington Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (97 detached homes, pocket parks). • Reverie, William Lyon Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (118 detached homes, pocket parks). • Topaz, The New Home Company, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (25 detached homes, pocket park). • Vida, Pulte Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (66 attached homes, pocket parks). • Alma, Pulte Homes, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (66 detached homes, pocket parks). • Azure, The New Home Company, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (80 attached homes, paver courtyards, pocket parks). • Cobalt, The New Home Company, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (36 multi-family, three-story attached homes, pocket park). • Sterling, The New Home Company, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and residential development (63 detached homes, MSE retaining wall, pocket park).

APARTMENT SITES:
• Sendero Bluffs Apartments, Western National Properties, Sendero, Rancho Mission Viejo, California – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and site development.
• Esencia Sur Apartments, Western National Properties, Esencia, Rancho Mission Viejo, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and site development.
624
David Hansen 4
• Esencia Norte Apartments, Western National Properties, Esencia, Rancho Mission Viejo, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and site development.

RETIREMENT COMMUNITIES:
• Sun Lakes Master Planned Community, Presley Homes, Banning/Beaumont, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for major master planned community (1500+ homes, 18-hole golf course, country club, shopping centers), geotechnical engineering issues such as hard rock, blasting, hydro-collapsible alluvial soils. • Reata Glen Continuing Care and Retirement Center, Sendero Area, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development (3-story apartment complex with underground parking structure, multistory condominiums, townhomes, recreation center), geotechnical engineering issues such as highly expansive and corrosive soils.

LUXURY SEMI-CUSTOM AND CUSTOM HOME PROJECTS:
• Artisan I & II, William Lyon Homes, Covenant Hills, Ladera Ranch, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development (29 custom homes and exterior improvements), geotechnical engineering issues such as highly expansive and corrosive soils.
• Coral Crest and Coral Canyon, The New Home Company, Crystal Cove, Newport Coast, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development (28 custom homes and exterior improvements), geotechnical engineering issues such as expansive and corrosive soils, deep fills. • Sky Ranch, The New Home Company, Covenant Hills, Ladera Ranch, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development (28 custom homes and exterior improvements), geotechnical engineering issues such as highly expansive, corrosive soils, post-tension foundations, and deepened foundations for slope setback issues.
• Villa Del Lago, Pelican Crest, Newport Coast, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and site development (large custom home complex with main residence, guest/pool house, pool, lake with bridge and waterfall, equestrian barn and arena, tennis court), geotechnical engineering issues such as highly expansive, corrosive soils, deepened foundations for slope setback issues. • The Strand at the Headlands, Dana Point, CA – Lead Geotechnical Engineer - Geotechnical investigations and designs for precise grading and site development (multiple custom home sites), geotechnical engineering issues such as expansive soils, shoring, deepened foundations for slope setback issues, evaluation of influence of construction on existing MSE walls).
625
David Hansen 5
• Crystal Cove, Newport Coast, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigations and designs for precise grading and site development (multiple custom home sites), geotechnical engineering issues such as expansive soils, shoring, deepened foundations for slope setback issues).
• Emerald Bay, Laguna Beach, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigations and designs for precise grading and site development (multiple custom home sites), geotechnical engineering issues such as expansive soils, shoring, hard rock conditions.
• 2 Via Terracaleta, Coto De Caza. Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and site development (9 custom homes, access roadways, and exterior improvements), geotechnical engineering issues such as expansive soils, slope stability issues.

COMMERCIAL DEVELOPMENT PROJECTS:
• Del Prado Mixed-Use Development, Pacific Coast Highway, Dana Point, CA – Lead Geotechnical Engineer – Geotechnical investigation and design for precise grading and site development - Two four-story mixed-use buildings over 2-story subterranean parking structures. Design included mat foundation design, spread footing design, shoring design, and permanent retaining wall design.
• Sendero Gateway Marketplace, Western National Properties, Sendero, Rancho Mission Viejo, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development – retail buildings, gas station, grocery building. Design included mat foundation design, spread footing design, retaining wall design. • The Gathering at Los Patrones Retail Site, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development – Two self-storage buildings, three tilt-up retail buildings.

Design included mat foundation design, spread footing design. • Capistrano Mazda and Volkswagon Dealerships, Valle Road, San Juan Capistrano, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development – New showroom buildings and parking. Design included foundations for highly expansive soils.

CHURCHES AND RELIGIOUS FACILITIES:
• Gloria Dei Lutheran Church, Stonehill Drive, Dana Point, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development – Sanctuary, Preschool/Administration building, gymnasium. Design included mat foundation design, spread footing design, deepened foundations, retaining wall design, soldier pile wall. 626
David Hansen 6
• St. Michaels Abbey, Silverado Canyon Road, Silverado Canyon, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and site development – Hydro-arch bridges, Monastery, church, chapel, administration building, school, and gymnasium. Design included mat foundation design, spread footing design, retaining wall design, and onsite sewage absorption system design.

EDUCATIONAL FACILITIES:
• Engineering Building, California Polytechnic University at Pomona, CA – Project Geotechnical Engineer - Geotechnical investigation and design for remedial grading and site development – Design included, settlement analysis, spread footing design, retaining wall design.
• Parking Structure and Engineering Building, California State University Northridge, CA – Project geotechnical Engineer - Geotechnical investigation and design for remedial grading and site development – Design included, settlement analysis, liquefaction analysis, foundation design.
• Child Care Facility, Naval Air Weapons Station, Point Magu, CA – Project Geotechnical Engineer - Geotechnical investigation and design for remedial grading and site development – Design included, liquefaction analysis, remediation of adverse shallow groundwater conditions, settlement analysis, foundation design.
• Chemistry Building, University of California, Irvine – Project geotechnical Engineer - Geotechnical investigation and design for remedial grading and site development – Design included settlement analysis and deep foundation design. • Rancho Mission Viejo Joint-Use Pavilion, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development – Geotechnical design for joint-use gymnasium and community building with OSHPD compliance.

MEDICAL BUILDINGS:
• The Orchards Assisted Living and Skilled Nursing Facility, Reata Glen, Sendero Area, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for rough and precise grading and site development, geotechnical engineering issues such as OSHPD compliance, highly expansive and corrosive soils.

RECREATIONAL FACILITIES AND SPORTS PARKS:
• Belmont Plaza Revitalization, Olympic Plaza, Long Beach, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for remedial grading and site development – Geotechnical design for temporary Olympic pool and stadium, geotechnical engineering issues such as shallow groundwater and liquefaction.
627
David Hansen 7
• Bonita Canyon Sports Park, City of Newport Beach Public Works Department, Newport Beach, CA – Lead Geotechnical Engineer for geotechnical investigation and design for precise grading and site development. Geotechnical design for sportspark complex with synthetic fields, baseball fields, tennis courts, recreational pool, and community building.

Infiltration design of subsurface field drainage system. • Newport Beach Country Club, Pacific Coast Highway, Newport Beach, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development – Geotechnical design for new country club recreation building, swimming pool, tennis courts, townhome and access roadways.
• Oso Creek Trail, Forbes Road, Laguna Niguel, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development.

Geotechnical design of retaining walls and permeable pavement systems. • Hilltop Club, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer.

Geotechnical investigation and design for precise grading and site development.

Geotechnical design for recreational facility with two community buildings, recreational pool and spa, and bocce ball courts. Design included post-tension foundation design and retaining wall design.
• Esencia Sportspark, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development – Geotechnical design for sports park complex with synthetic fields – baseball fields, tennis courts, recreational pool, and community building. Infiltration design of subsurface field drainage system.

HOTELS:
• Hampton Inn and Suites, Dupont Drive, Irvine, CA – Project Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development, geotechnical engineering issues such as collapsible soils, expansive and corrosive soils. • The Wave Resort, Pacific Coast Highway, Dana Point, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and site development, geotechnical engineering issues such as bedrock/fill transitions, hard rock conditions, highly expansive soils, shoring, and impact on stability of existing Soil Nail wall.

WATER RESOURCE PROJECTS:
• 30-inch San Juan Creek Effluent Transmission Main Replacement, Moulton Niguel Water District, San Juan Capistrano, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for replacement of main effluent line below San Juan Creek. geotechnical engineering issues such as deep shaft excavation and shoring, micro-tunneling, dewatering. 628
David Hansen 8
• La Sienna Mainline Replacement Project, Moulton Niguel Water District, Laguna Niguel, CA – Lead Geotechnical Engineer - construction oversight of water line removal and replacement.
• Esencia PA-2 Zone B Pump Station, Santa Margarita Water District, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for precise grading and construction. geotechnical engineering issues such as bedrock/fill transitions, soldier pile retaining wall design. • Middle Chiquita Canyon Water Facilities, Santa Margarita Water District, Chiquita Canyon, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for installation of main transmission lines,. geotechnical engineering issues such as bedrock/native soil transitions, shallow groundwater, shoring, dewatering • La Paz/Moulton PW System Reconfiguration Project, Moulton Niguel Water District, Laguna Hills, CA – Lead Geotechnical Engineer - construction oversight of water line removal and replacement.
• Upper Salada Lift Station Site Expansion and Generator Replacement, Moulton Niguel Water District, Niguel Road, Laguna Niguel, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for expansion of site and installation of new generator and retaining walls.
• 2016-2017 Reservoir Management Systems Replacement Project, Moulton Niguel Water District, Aliso Viejo, Laguna Niguel, Mission Viejo, CA – Lead Geotechnical Engineer - construction oversight of precise grading and installation of new Chemical Facility buildings and associated water line removal and replacement.
• 2017-2018 Reservoir Management Systems Replacement Project – Phase 2, Moulton Niguel Water District, Aliso Viejo, Laguna Niguel, Mission Viejo, CA – Lead Geotechnical Engineer - construction oversight of precise grading and installation of new Chemical Facility buildings and associated water line removal and replacement.

ONSITE SEWAGE ABSORTION SYSTEM DESIGN PROJECTS:
• Iacono Residence, Rose Canyon Road, Trabuco Canyon, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for onsite sewage absorption system design with shallow rock concerns.
• Ramsey Residence, Jackson Ranch Road, Santiago Canyon, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for onsite sewage absorption system design.
• St. Michaels Abbey, Silverado Canyon Road, Silverado Canyon, Orange County, CA – Lead Geotechnical Engineer - Geotechnical investigation and design for secondary sewage treatment plant and onsite sewage absorption system design. 629
David Hansen 9
CITY GEOTECHNICAL CONSULTANT/THIRD PARTY REVIEW:
• City of Buena Park, CA (2005 – 2011) – Review of geotechnical reports, general geotechnical consultation, Public works project design and geotechnical and materials inspection.
• City of Mission Viejo, CA (2005 – 2011) – Review of geotechnical reports, general geotechnical consultation, Public works project design and geotechnical and materials inspection.
• City of Laguna Niguel, CA (2012-Present) – Review of geotechnical reports, general geotechnical consultation.
• City of Chino Hills, CA (2012-Present) – Review of geotechnical reports, general geotechnical consultation.

GEO-STRUCTURAL ENGINEERING
MECHANICALLY STABILIZED EARTH (MSE) WALLS:
• La Chance Residence, Via Colinas, Coto De Caza, County of Orange, CA – Design and construction oversight of 8- to 12-foot-high MSE wall to support rear yard improvements. • Topaz Residential Development, MR30, The New Home Company, Esencia, Rancho Mission Viejo, Orange County, CA – Lead Geotechnical Engineer - Design and construction oversight of 8-foot-high MSE wall to support side yard improvements. • Siddiqi Residence, Waves End, Crystal Cove, Newport Coast, County of Orange, CA – Design and construction oversight of six tiered 4- to 8-foot-high MSE walls to support rear yard improvements.

REDI-ROCK GRAVITY WALLS:

El Camino Real Wall, City of San Juan Capistrano, CA – Design and construction oversight of 12- to 18-foot-high stacked gravity block wall to support El Camino Real Road.

Saint Margaret’s Episcipol Church Parking Lot, San Juan Capistrano, CA – Design and construction oversight of 10- to 12-foot-high stacked gravity block wall to support Ortega Highway
630
David Hansen 10

PROJECT AWARDS
The following project awards are for projects where Mr. Hansen served a primary role in either the geotechnical engineering design or management of the project. • Project Award – APWA 2014
o Belmont Revitalization Project and Temporary Pool, Long Beach • Project Award– APWA 2014
o El Camino Real Wall, San Juan Capistrano
• Outstanding Bikeways and Trails Project – ASCE 2015
o Oso Creek Multi-use Trail
• Outstanding Urban or Land Development Project – ASCE 2016 o Esencia Residential Development, Rancho Mission Viejo • Community Improvement Project of the Year – ASCE 2018 o Rancho Mission Viejo Joint-Use Pavilion, Rancho Mission Viejo 631
30336 Esperanza, Rancho Santa Margarita, CA 92688 | ph: 949.888.6513 | fax: 949.888.1380 | web: www.gmugeo.com GREGORY SILVER, M.SC., PE, GE
President/CEO

PROFESSION
Geotechnical Engineer
Civil Engineer

REGISTRATIONS
Registered Civil Engineer,
State of California
Registered Geotechnical Engineer,
State of California
Registered Civil Engineer, State of
Nevada
Registered Civil Engineer, State of
Utah

EDUCATION
M.S. Civil Engineering, California
State University, Long Beach
B.A. Geological Sciences,
University of California, Santa
Barbara, Goleta

PROFESSIONAL AFFILIATIONS
ASCE
ACEC
BIA
CalGeo, Past President
Greg. has over 36 years of progressively responsible
engineering and management experience in a wide variety of geotechnical engineering projects. He has worked
successfully for and with industrial, residential, and
commercial developers, master community planners, and
governmental agencies. He has extensive experience in
landslide evaluation and remediation design, geotechnical instrumentation, residential and commercial development, public works projects, municipality consultation,
mechanically stabilized earth walls, and forensic projects. In addition, he has served as an expert witness in regard to numerous geotechnical issues over the last 25 years. Over the period of 1988 to 1997, Greg was City Geotechnical
Engineer for numerous cities throughout Southern
California. He currently serves as President and Principal Engineer of GMU.

Selected types of projects representative of Mr. Silver’s experience are listed below:
x Commercial Development Projects
x High-rise Structures
x Landslides
x Residential Development Projects/Master Planned
Communities
x Major Roadways
x Bridges
x Water Resource Projects
x Dewatering Projects
x Miscellaneous Public Works Projects
x Government/Civic Centers
x Sports Parks
x Mechanically Stabilized Earth (MSE) Walls
x Soil Nail Walls
x Geotechnical Instrumentation
x Tie-back Slope Reinforcement
x Pavement Engineering and Design
x City Geotechnical Engineer/Consultant
x Legal Consultation
x Special Studies
632
Gregory P. Silver 2

GEOTECHNICAL ENGINEERING
COMMERCIAL DEVELOPMENT PROJECTS:
20/40 Pacifica Office Towers, Irvine, CA: Lead Geotechnical Engineer – Two high-rise office buildings and one 5 story parking structure. Design involved foundation systems consisting of driven piles and geopiers.
520 Newport Center Drive Office Tower, Newport Beach, CA: Principal-in-charge – one 20- story high-rise office building and adjacent 6-story parking structure. Design involved mat and spread footing foundation design and analyses, shoring design, and permanent retaining wall design.
650 Newport Center Drive Office Tower, Newport Beach, CA: Principal-in-Charge – one 20- story high-rise office building and two adjacent multi-story parking structures with up to 2-story subterranean sections. Design included mat foundation design, spread footing design, shoring design, and permanent retaining wall design.
200 Spectrum Center Drive Office Tower, Irvine, CA: Principal-in-Charge – 21 story office building and one adjacent 6 story parking structures. Design included driven pile foundation design, spread footing design, shoring design, and permanent retaining wall design. 400 Spectrum Center Drive Office Tower, Irvine, CA: Principal-in-Charge – one 21 story office building and one adjacent 6-story parking structures with up to 2-story subterranean sections.

Design included mat foundation design, spread footing design, shoring design, and permanent retaining wall design.

Irvine Spectrum Marriott Hotel, Irvine CA: Principal-in-Charge – one 15 story hotel building with adjacent 2 story event center. Design included mat foundation design, spread footing design, and permanent retaining wall design.

Sand Canyon Business Park, Irvine, CA: Principal-in-Charge/Lead Geotechnical Engineer – multi-story campus masonry block buildings on highly expansive soils with associated parking, walkways, etc. Geotechnical design included innovative partial mat/partial conventional slab to minimize expansive soil movements.

Discovery Business Center, Irvine, CA: Principal-in-Charge/Lead Geotechnical Engineer – multi-story campus masonry block buildings on highly expansive soils with associated parking, walkways, etc. Geotechnical design included innovative partial mat/partial conventional slab to minimize expansive soil movements.

Capitol Group Office Campus, Irvine, CA: Lead Geotechnical Engineer – Large office campus on highly expansive soils. Project involved geopier and select soil replacement subgrade improvement strategies.

Spectrum 5, Spectrum 7, Spectrum 1, Irvine, CA: Principal Geotechnical Engineer - Oversight of investigation design and construction.
633
Gregory P. Silver 3
Bridgepark Plaza, Mercantile East, Mercantile West, and Corporate Terrace, Ladera Ranch, CA:

Principal Geotechnical Engineer - Oversight of investigation design and construction.

University Research Park Office Development, Irvine, CA: Principal Geotechnical Engineer - Oversight of investigation design and construction.

LANDSLIDES:

Poppy Trail Landslide, Palos Verdes, CA: Lead Engineer and Investigator - Detailed geotechnical engineering analyses of landslide that resulted in damage to an existing home and Poppy Trail Drive. Determined causation and led forensic team to a legal settlement. Developed stabilization plan that involved creating two lots where only one had existed before to create an economically viable repair. Repair consisted of buttress grading, temporary stabilization measures, deep-seated and surficial geogrid stabilization and MSE walls. GMU performed the geotechnical engineering, civil engineering, structural engineering and construction management for the project.

Philemon Landslide, Dana Point, CA: Lead Engineer and Investigator - Detailed geotechnical engineering analyses of a deep seated geologically controlled landslide that resulted in the demolition of several homes. Evaluated and determined causation and developed innovative and award-winning stabilization plan using high strength aggregate cement slurry. The stabilization approach is documented in a paper published by the ASCE Geo-Institute.

China Cove Slope Stabilization, Newport Beach, CA: Lead Engineer and Investigator - Developed aesthetically pleasing soil nail Slope stabilization to mitigate years of surficial slumping and shallow slumping on slope face. Evaluated and determined geotechnical characteristics of the failures, developed the repair methodology and developed complete structural plans for bidding.

Palos Verdes Drive Roadway Stabilization, Palos Verdes, CA: Lead Engineer and Investigator - Developed 50-year road stabilization plan to protect roadway from adjacent deep seated landslide movement. Performed geotechnical and structural engineering for the stabilization plan consisting a mut-tier tie-back wall.

Sunset Crossing Landslide, City of Diamond Bar, CA: Lead Engineer and Investigator - Working with the Slope remediation contractor, the City and several private landowners.

Developed landslide repair for deep seated landslide where several other groups failed. Repair involved using tie-backs and multi-tied slot grading.
634
Gregory P. Silver 4
Brancato Landslide, Gill Properties, San Jose, CA: Lead Engineer - Provided detailed geotechnical engineering analysis of large, deep-seated landslide including shear strength determination, static and pseudo-static analyses, seismic deformation analyses, and development of geotechnical mitigation schemes.

Horseshoe Landslide, Anaheim Hills, CA: Lead Investigator – Comprehensive geological and geotechnical engineering evaluation of re-activated ancient landslide. Development of remediation scheme consisting of horizontal drains, buttress grading, and tie-backs.

Voyager Lane Landslide, Laguna Niguel, CA: Lead Investigator – Detailed evaluation of longterm monitoring data leading to the development of an innovative long-term repair consisting of a horizontal drain system, a surface water infiltration mitigation system, and roadway stabilization and subgrade strengthening.

Rambla Pacifico Landslide Stabilization, Malibu, CA: Project Director on one million dollar landslide stabilization design. Involved working with FEMA and OES and within NEPA/CEQUA guidelines.

Calle Montecillo Roadway Stabilization, Agoura Hills, CA: Project Director - Evaluation and design of roadway slope stabilization. Design, plans, and specifications.

Big Rock Mesa Landslide Area, County of Los Angeles, CA: Project Engineer - Large-scale geotechnical investigation and evaluation, deep dewatering and horizontal drain installation, pump tests, and geotechnical instrumentation and monitoring.

Montellano Landslide, Hacienda Heights, CA: Project Manager/Engineer - Pump tests, geotechnical monitoring, and long-term surface drainage improvement design with plans and specifications.

Mystic Hills Landslide, City of Laguna Beach, CA: Project Geotechnical Engineer - Third party geotechnical evaluation of the stability of an ancient landslide for the City of Laguna Beach.

Kanan Dume Road Landslide, Malibu, CA: Project Director - Monitoring, geotechnical evaluation, geological evaluation, remediation design for a 100-foot roadway embankment failure.

Via Estoril Landslide, Laguna Niguel, CA: Emergency response to large landslide which endangered numerous residential structures, emergency geotechnical recommendations, review of interim and final repairs.

South Facing Slope Landslide, BRM Landslide Assessment District/City of Malibu Public Works, Malibu, CA: Project Director - Provided detailed geotechnical engineering evaluation of an ancient landslide. Investigation included specialty laboratory testing including ring shear testing and x-ray diffraction, two- and three-dimensional stability analyses, and parametric groundwater and seismic evaluation.
635
Gregory P. Silver 5
Tract 33410 Slope Failures, Agoura Hills, CA: Project Director - Detailed geotechnical evaluation of one deep-seated and two surficial slope failures. Tasks included preparation of plans and specifications for repair and expert witness-related consultation.

RESIDENTIAL DEVELOPMENT PROJECTS/MASTER PLANNED COMMUNITIES:

Santaluz, City of San Diego, CA: Principal Geotechnical Engineer - Oversight – Project direction and oversight for complex geotechnical engineering issues including: hard rock, blasting, rock fills and utility over-excavation.

Sendero Development, County of Orange, CA: Principal Geotechnical Engineer - Oversight – Project direction and oversight for complex geotechnical engineering issues including: time delayed settlement and resulting solutions involving surcharge and wick drain design and debris flow evaluation and mitigation and slope stability.

Banning Ranch Development, Newport Beach, CA: Project Director – Comprehensive geotechnical and fault evaluation study for proposed residential and hotel development. Fault investigation included thousands of lineal tests of fault trench through the Newport-Inglewood fault zone.

Ladera Ranch Planned-Community Development, Rancho Mission Viejo Company, County of Orange, CA: Project Engineer - Geotechnical investigation and design for portions of major master planned community.

Crystal Cove Planned Development, ICDC, Newport Coast/County of Orange, CA: Principal in Charge - Oversight of geotechnical engineering for mass grading, public works improvements, and residential development.

Talega Planned-Community Development, San Clemente, CA: Principal – Oversight of geotechnical engineering for mass grading, public works improvements, and residential development.

Rancho Santa Margarita Planned-Community Development, Rancho Santa Margarita, CA:

Project Engineer/Manager - Geotechnical investigation, grading and foundation design, and construction observation for a number of planning areas in a major residential planned community development.

Edgewater Development, Chino, CA: Project Director – Geotechnical investigation and design for large residential development area with recreational lake network.

Planning Area 19A Feasibility Study, City of Irvine, CA: Project Engineer - Geotechnical investigation to advise on planning-related issues for roadway and general development in a marsh/soft clay site environment.

Various Foundation Investigations 1984-88: Single-family residences, large tracts, commercial/industrial structures and high-rise buildings throughout Los Angeles County. 636
Gregory P. Silver 6
MAJOR ROADWAYS:

Ortega Highway Widening, County of Orange/City of San Juan Capistrano, CA: Lead Geotechnical Engineer/Principal-in-Charge – Geotechnical investigation and development of design recommendations.

Irvine Center Drive, Lake Forest Drive, and Sand Canyon Boulevard Street Widening, ICOP, Irvine, CA: Principal Geotechnical Engineer - Oversight of design and construction.

Avenida Vista Hermosa, Avenida La Pata, Avenida Fresas, Avenida Saluda, and Avenida Talega, City of San Clemente/Talega Associates, San Clemente, CA: Principal Geotechnical Engineer - Oversight of design and construction.

La Pata Avenue Extension, City of San Juan Capistrano/City of San Clemente/ County of Orange, CA: Principal Geotechnical Engineer – Oversight and project management for planning, EIR and design.

BRIDGES:

Ortega Bridge Widening, County of Orange, CA: Project Director – Geotechnical investigation and development of design recommendations for Caltrans bridge.

Cow Camp Bridges, County of Orange, CA: Project Director – Geotechnical investigation and development of design recommendations for two bridges crossing complex geotechnical environs.

San Juan Creek Bridge Widening, Orange County Public Works, County of Orange, CA: Project Director - Geotechnical investigation, detailed geotechnical evaluation of seismic retrofit, and development of widening foundation recommendations.

Wildlife Crossing Bridge Widening, County of Orange/Ladera, CA: Principal Geotechnical Engineer – Oversight of widening project of existing bridge.

Las Flores Bridge, Malibu, CA: Project Engineer/Manager - Evaluation of bridge design and alternatives for the City of Malibu.

Crown Valley Parkway Bridge, County of Orange, CA: Lead Geotechnical Engineer for 238- meter-long, 27-meter-high bridge. Detailed geotechnical analysis for pile foundation design, abutment design, and geotechnical input to bedrock scour design.

Oso Parkway Pedestrian Bridge, County of Orange, CA: Project Engineer - Geotechnical design for 65-foot span pedestrian bridge.
“A” Street Bridge at Barranca Parkway, City of Irvine, CA: Project Engineer/Manager - Geotechnical investigation and design for new bridge over San Diego Creek. 637
Gregory P. Silver 7
“Los Angeles Avenue Bridge”, Moorpark, CA: Project Engineer/Manager - Geotechnical assessment of proposed bridge expansion and retrofit. Development of preliminary design recommendations.

Tustin Avenue Bridge Widening, Anaheim, CA: Principal Geotechnical Engineer - Oversight for widening project of existing bridge.

Washington Boulevard Bridge, Moorpark Public Works/CAA Los Angeles County, CA: Project Engineer - Provided geotechnical investigation and design for seismic retrofit of existing bridge.

WATER RESOURCE PROJECTS:

Tesoro Reservoirs, Zone II and B, Santa Margarita Water District/RMV, County of Orange, CA:

Principal Geotechnical Engineer - Provided geotechnical evaluation of 2-3MG reservoirs.

Horno Basin Detention Basin, RMV/Orange County Public Works, County of Orange, CA:

Project Director for the geotechnical investigation and design of a detention basin, spillway, biofiltration system, and sub-drainage recapture system.

Oso Creek Geotechnical Scour Study, RMV/Orange County Public Works, Mission Viejo, CA:

Project Director - Provided geotechnical evaluation of in-situ geotechnical materials for scour evaluation and revetment study.

Various Water Lines, Sewer Lines, Talega Lift Station, South Ranch Lift Station, San Juan Creek Lift Station, and Ladera Zone 2 Reservoir, Talega Zone 1 Reservoir and Covenant Hills Reservoir and Lift Station, Santa Margarita Water District, Rancho Santa Margarita, Las Flores, Coto de Caza, and Ladera Ranch, CA: Principal Geotechnical Engineer - Oversight.

Las Flores Canyon Sedimentation - Debris Flow Study, City of Malibu Public Works, Malibu, CA: Project Manager/Engineer for the geotechnical and geological input for hydraulic analyses.

Northwood Reservoir, Irvine, CA: Project Geotechnical Engineer - Evaluation of foundation design and settlement potential for 4.5 MG reservoir.

Hicks Canyon Detention Basin, Irvine, CA: Geotechnical Consultant for the geotechnical analysis and design of two large detention basins.

San Diego Creek Channel Improvements, Orange County Public Works, Irvine, CA: Project Manager/Engineer for the geotechnical investigation of proposed channel improvements consisting of soil cement and “keystone” geogrid-type revetments.

Trampas Canyon Dam, Santa Margarita Water District, Orange County, CA: Provided geotechnical engineering support and oversight during construction of 1.6 billion gallon earth dam reservoir for the Santa Margarita Water District.

Various Reservoirs, Santa Margarita Water District, Ladera Ranch, CA: Lead Geotechnical Engineer for numerous steel tank reservoirs throughout the master planned community of Ladera Ranch for the Santa Margarita Water District
638
Gregory P. Silver 8
San Diego Clean Water Project, City of San Diego, CA: Geotechnical Engineer for portions of the Clean Water project. Tasks included field drilling, and geotechnical design.

MISCELLANEOUS PUBLIC WORKS PROJECTS:

Marina Park Project, City of Newport Beach, CA: Geotechnical Project Manager of geotechnical and Materials Inspections. Project involved stone columns for liquefaction remediation, concrete sheet pile walls with tie-backs and specialty foundation design City of Laguna Niguel - Metrolink Station, Laguna Niguel, CA: Principal Geotechnical Engineer - Oversight for a regional OCTA-funded commuter rail station.

BRM Storm Drain Replacement Project, Malibu, CA: Project Manager/Engineer - Evaluation of storm drainpipe design in landslide and erosion prone area following destruction of system by fire.

Metro-Rail Vibration Testing, Los Angeles, CA: Project Engineer - Geotechnical exploration and input for vibration study.

Big Rock Mesa Dewatering Well Project, Malibu, CA: Project Engineer/Manager - Design, plan and specification preparation, installation and construction oversight for six dewatering wells to 350 feet and four horizontal drains.

Montellano Winterization, Hacienda Heights, CA: Project Engineer/Manager - Design and construction oversight of long-term, multi-year landslide winterization.

Pavement Evaluation, Pomona, CA: Project Manager/Engineer - Pavement evaluation for 4000 lineal feet of distressed pavement.

GOVERNMENT/CIVIC CENTERS:

Chino Hills Government Center Complex, Chino Hills, CA: Project Director – Geotechnical investigation, development of recommendations and plans for multi-faceted government center consisting of multi-story government buildings and a four-story parking structure.

Vista Civic Center, Vista, CA: Project Director – Development of final geotechnical design recommendations for Vista Civic Center.

Lake Forest Civic Center, City of Lake Forest, CA: Principal Geotechnical Engineer. Design oversight for geotechnical engineering aspects of the project including: Geotechnical Foundation Design, Slope Stability, and MSE wall design.

Laguna Niguel Civic Center, City of Laguna Niguel, CA: Lead Geotechnical Engineer - Geotechnical design oversight for investigation and design recommendation development. 639
Gregory P. Silver 9
SPORTS PARKS:

La Paz Sports Park, City of Laguna Niguel, CA: Project Director - Geotechnical design for sports park complex with synthetic fields. Infiltration design of subsurface field drainage system.

Chino Hills Sports Park, Chino Hills, CA: Project Director – Geotechnical investigation and design for large Sports Park complex with numerous synthetic fields.

Long Beach Sports Park, Long Beach, CA: Project Director – Geotechnical investigation and design for planned regional Sports Park in oil fields operation area. Developed unique design recommendations for proposed facilities to be placed on top of buried rubble and debris.

Jarupa Water Park, Jarupa, CA: Project Director – Geotechnical investigation and design for multi-acre water park facility.

GEOTECHNICAL INSTRUMENTATION:

Monitoring and evaluation of slope inclinometers and piezometers for various select projects:

Poppy Trail Landslide, Palos Verdes, CA
Horseshoe Landslide, Anaheim, CA
Cyprus Shores Landslide, San Clemente, CA
South Shores Landslide, Rancho Palos Verdes, CA
La Paz Road Movement, Laguna Niguel, CA
Palos Verdes Drive Roadway Distress, Palos Verdes Estates, CA Canyon Wren Slope/Street Deformation, Aliso Viejo, CA
Philemon Landslide, Dana Point, CA
Suncrest Landslide, San Jose, CA
Sierra Road Landslide, San Jose, CA
Ladera Residential Development, County of Orange, CA: Principal Geotechnical Engineer - Oversight of “real time” monitoring system for electrical towers above temporary slopes during grading.

La Paz Road Monitoring Project, City of Laguna Niguel, CA: Project Manager - Long-term monitoring of on-going slope movements. Monitoring program enables City of Laguna Niguel to implement roadway stabilization projects incrementally and cost-effectively on an as-needed basis. Instrumentation includes slope inclinometers, multi-stage piezometers, and survey.

Crystal Cove, Newport Coast, CA: Project Director - Long-term evaluation of surface and subsurface survey network and slope inclinometers to evaluate deep fill/fill slope performance.

Oceanside Dewatering, Oceanside, CA: Project Engineer - Construction overview and monitoring of dewatering tunnel, horizontal drain, and tie-back installation.

Port of Los Angeles, Pier 300 Expansion, POLA, CA: Project Manager/Engineer - Design, installation, and monitoring of specialty geotechnical instrumentation for port expansion. 640
Gregory P. Silver 10
Big Rock Mesa, Malibu, CA: Project Manager/Engineer - Managed monitoring and dewatering district consisting of dewatering wells, horizontal drains, slope inclinometers, piezometers, multi-position extensometer, survey network, and groundwater discharge analysis.

Calle del Barco, Malibu, CA: Project Manager/Engineer - Managed monitoring and dewatering district consisting of dewatering wells, horizontal drains, slope inclinometers, piezometers, and crack gauges.

Malibu Road, Malibu, CA: Project Manager/Engineer - Managed monitoring and dewatering district consisting of piezometers, horizontal drains, and crack gauges.

Latigo Canyon, Malibu, CA: Project Manager/Engineer - Managed monitoring and dewatering district consisting of slope inclinometers, piezometers, horizontal drains, dewatering wells, and crack gauges.

Rambla Pacifico Landslide, Malibu, CA: Project Engineer - Installation and monitoring of slope inclinometers and multi-stage pneumatic piezometers.

La Conchita Landslide, Ventura County, CA: Project Engineer/Manager - Design, installation, and monitoring of a system of slope inclinometers and multi-stage piezometers.

Hope Church, Rancho Bernardo, CA: Project Engineer/Manager - Design, installation, and monitoring of complex monitoring array consisting of tiltmeters, survey network, slope inclinometers, and multi-stage pneumatic piezometers.

DEWATERING DESIGN &MANAGEMENT PROJECTS:

Dewatering Remediation, CZ Master Association, Coto de Caza, CA: Project Engineer - Hydrogeologic modeling and Modeling design of dewatering cut-off trench to lower groundwater below home foundations.

Dewatering District Oversight, Big Rock, Latigo Canyon, Malibu Road, Malibu, CA:

Engineer/Manager - Work included: dewatering district management, hydrogeologic modeling, well design and maintenance, horizontal drain design as well as maintenance and monitoring.

Montellano Landslide Dewatering, Hacienda Heights, CA: Project Engineer/Manager – Pump tests, dewatering wells design and construction, design and construction oversight of horizontal drains.

CITY GEOTECHNICAL ENGINEER/CONSULTANT:

City of Mission Viejo (2016 – Present): Review of geotechnical reports, general geotechnical consultation, Public works project design and geotechnical and materials inspection.

Geotechnical Report Reviews, City of Laguna Niguel, CA (1997-Present): Review of geotechnical reports, preparation of guidelines, public works projects, geotechnical hazards analysis including testimony in front of state legislative committees, emergency response and legal consultation.
641
Gregory P. Silver 11
Various Projects, City of Newport Beach, CA (2009-Present): Public Works projects including street rehabilitation, construction observations and testing, marina construction, and legal consultation.

Geotechnical Consultation, City of Chino Hills, CA (1992-97 & 2002-Present): Review of geotechnical reports, preparation of guidelines for report submittal and grading procedure requirements, public works projects, and general geotechnical consultation.

City of Dana Point (2001-2014; 2015-Present): Review of complex geotechnical projects, emergency and litigation consultation, and public works projects.

City of Vista (2000-2005): Review of geotechnical reports and general geotechnical consultation.

City of Rancho Palos Verdes (2004-2006): Alternate member of Geotechnical Appeals Board.

City of Malibu (1991-97): Review of geotechnical reports, preparation of guidelines, policy and standards for report submittal, public works projects, geotechnical hazards analysis, emergency response, planning evaluation, legal consultation.

City of Moorpark (1995-97): Review of geotechnical reports, preparation of guidelines, policy and standards for report submittal.

City of Agoura Hills (1988-97): Review of geotechnical reports, preparation of guidelines, policy and standards for report submittal, public works projects, geotechnical hazards analysis, emergency response, planning evaluation, legal consultation.

City of Palos Verdes Estates (1992-97): Review of geotechnical reports, preparation of guidelines, policy and standards for report submittal, public works projects, geotechnical hazards analysis, emergency response, planning evaluation, legal consultation.

City of Hidden Hills (1992-97): Review of geotechnical reports, preparation of guidelines, policy and standards for report submittal.

Additional Geotechnical Consultation to Cities: Cities of Lake Forest, La Habra Heights, and Laguna Beach, CA.

PAVEMENT ENGINEERING AND DESIGN
Various Projects, City of Irvine Public Works Department, CA (2012-2014): Principal-in-Charge - Various projects including: Irvine Center Drive, Campus Drive, Jamboree Boulevard, and Jeffrey Road pavement rehabilitations.

Street Widening and Overlays, Cities of Irvine and Lake Forest, CA (1997-2010): Principal-inCharge - Geotechnical Engineer - Oversight of design and construction for various projects including: Irvine Center Drive, Lake Forest Drive, Bake Parkway, Portola Parkway, and Sand Canyon Boulevard street widening and overlays.
642
Gregory P. Silver 12
City of Dana Point, Dana Point, CA (2002-2014): Principal-in-Charge - Various projects including: Street of the Golden Lantern, Stonehill Drive, Del Obispo Street, Camino Capistrano, Pacific Coast Highway, Del Prado overlays, and miscellaneous residential street overlays and slurry seals.

City of Aliso Viejo, Aliso Viejo, CA (2012-2014): Principal-in-Charge - Various projects including: Aliso Creek Road, Pacific Park Drive, Moulton Parkway, Oso Parkway, La Paz Road overlays.

City of Laguna Niguel, Laguna Niguel, CA (2002-2014): Principal-in-Charge - Various projects including: Street of the Golden Lantern, Camino del Avion, Niguel Road, Cabot Road, Paseo de las Colinas, Camino Capistrano, Aliso Creek Road, La Paz Road rehabilitation and overlays, and miscellaneous residential street overlays and slurry seals.

City of Newport Beach, Newport Beach, CA (2009-2014): Principal-in-Charge - Various projects including: Newport Center Drive, Balboa Avenue, River Avenue, Mesa Drive, Bayside Drive overlays, and miscellaneous residential street overlays and slurry seals.

City of Rancho Santa Margarita, Rancho Santa Margarita, CA (2011-2014): Principal-in-Charge - Various projects including: Santa Margarita Parkway, Antonio Parkway, Robinson Ranch Road overlays and slurry seals (2006-2014); and miscellaneous residential street overlays and slurry seals.

City of Laguna Niguel, Laguna Niguel, CA (2002-2014): Principal-in-Charge - Various projects including: Street of the Golden Lantern, Camino del Avion, Niguel Road, Cabot Road, Paseo de las Colinas, Camino Capistrano, Aliso Creek Road, La Paz Road rehabilitation and overlays, and miscellaneous residential street overlays and slurry seals.

County of Orange Ortega Highway Widening, San Juan Capistrano, CA (2009-2011): Principalin-Charge - Pavement design for Phase 1 widening of Ortega Highway from the City of San Juan Capistrano border to Antonio Parkway. Design involved pavement rehabilitation of existing roadway and widening of both roadway shoulders.

GEO-STRUCTURAL ENGINEERING
MECHANICALLY STABILIZED EARTH (MSE) WALLS:

The Irvine Company Development Areas 2C4 and 5, County of Orange, Newport Coast, CA:

Design and construction oversight of numerous Loffel walls throughout the Newport Coast development area for The Irvine Company. Wall heights range up to 25 feet in height.

Ladera Development, County of Orange, CA: Design and construction oversight of 50-foot-high “Loffel”-type MSE wall at the entrance to the Ladera Development in South Orange County.

The wall was the highest wall permitted in the County of Orange to date. Due to the wall’s height, it involved an extensive design and review process. In addition, the wall was instrumented with slope inclinometers and an array of specially designed survey points integrated into the block facing. An abstract for a paper describing the wall design and instrumentation results was accepted to the ASCE GEO-DENVER 2000 Conference. 643
Gregory P. Silver 13
Distressed “Keystone” Wall Evaluations: 1) Placentia, Forensic evaluation of distressed “Keystone” wall for Shea Homes, 2) Agoura Hills, Forensic evaluation of distress behind “Keystone” wall for Oaks Christian School, 3) Rancho Bernardo, CA: Comprehensive forensic evaluation of severely distressed “Keystone” Wall at the Legacy/Toshiba development.

Crystal Cove Access Road, The Irvine Company, Orange County, CA: Design of up to 40-foothigh “Loffel”-type MSE wall to support a major access road to a detention basin and recreation area. Special design considerations included: High seismic area, use of select backfill in both reinforced and retained zones, and erosion protection at the toe of the wall.

Spectrum 5 Commercial Development Area, Irvine, CA: Design and construction oversight for over 1700 lineal feet of a “Loffel”-type MSE wall.

San Dimas Residential Development (Tract 52717), San Dimas, CA: Development of design plans and specifications for over 30 MSE walls incorporated into rough grading plans for a large residential development.

SOIL NAIL AND TIE-BACK WALLS/SLOPES:

China Cove Soil Nail Wall/Slope, City of Corona Del Mar, CA: Structural and geotechnical design and construction oversight for soil nail wall and slope with “boulderscape” facing.

Design done to mitigate long-term surficial failure problem and upgrade the look of a high profile slope.

Placentia Slope Stabilization, Placentia, CA: Structural design for soil nail wall at the rear of several homes in residential development. Wall was designed to stabilize slope while minimizing space impacts in rear yard.

HOA Tie-back Slope Stabilization, City of Orange, CA: Structural and geotechnical design and construction oversight for tie-back slope stabilization project. Complete design plans and specifications were provided. Geotechnical and special inspections performed during construction. Services also included construction management.

MASONRY RETAINING WALLS:

Masonry Wall Design, Sendero Development of Rancho Mission Viejo, CA: Complete geotechnical and structural design for masonry walls for level ground, toe-of-slope and top-ofslope conditions. Includes complete structural plans and details. Designs for miscellaneous structures such as pilasters, monuments also provided.

Masonry Wall Design, Esencia Development of Rancho Mission Viejo, CA: Complete geotechnical and structural design for masonry walls for level ground, toe-of-slope and top-ofslope conditions. Includes complete structural plans and details. Designs for miscellaneous structures such as pilasters, monuments also provided.
644
Gregory P. Silver 14
CAISSON WALLS:

Palos Verdes Drive Roadway Stabilization, Palos Verdes Estates, CA: Performed geotechnical and structural design and construction oversight for caisson tie-back wall to provide lateral support to a portion of Palos Verdes Drive North. Complete plans and specifications were developed.

Berquist Residence Caisson Supported Retaining Wall, Dana Point, CA: Performed structural engineering for caisson supported top of slope retaining wall. Complete plans and specifications were developed.

LEGAL CONSULTATION
Mr. Silver has provided geotechnical consultation for litigation on a wide variety of projects for over 20 years in the States of CA and Nevada. He has been deposed numerous times and testified in court on a number of occasions. The type of litigation cases that Mr. Silver has been involved in include:

Landslides
Foundation distress due to expansive soils and settlement Settlement adjacent multi-story buildings.

Concrete corrosion/sulfate damage
MSE walls/retaining walls
Dewatering/groundwater issues
Public works failures
Site drainage

SPECIAL STUDIES
Residential Foundation Deterioration Study for the Cities of Lakewood, La Palma, and Cypress, CA: Staff Engineer - Regional evaluation of concrete corrosion performed for CDMG. Study included: analysis of soil and groundwater conditions, review of construction practice and code requirements and other geotechnical/geological contributing factors.

RECENT PROJECT AWARDS
The following project awards are for projects where Mr. Silver served a primary role in either the geotechnical engineering design or management of the project.

Outstanding Geotechnical Project – CalGeo 2019
Inn at the Mission
Project Awards – ASCE 2018
Lido House Hotel
Outstanding Geotechnical Project – ASCE 2016
Emerald Bay Widening
Outstanding Structural Engineering Project – ASCE 2016
400 Spectrum Center Drive Soil Nail wall
645
Gregory P. Silver 15
Project Awards – APWA 2016
Marina Park
Oso Creek Multi-use Trail
La Pata Extension
Geotechnical Project of the Year – 2016 – OC/LA ASCE
Cow Camp Road Design – Phases 1A & 1B
Geotechnical/Structural Project of the Year Award – 2015 – OC/LA ASCE 650 Newport Center Drive Office Tower and 670 Newport Center Drive Parking Structure
Airport and Ports Award – OC ASCE 2015
Marina Park
Community Improvement Project Award – OC ASCE 2015
PCH/Del Prado Bridge and Street Improvements

PUBLICATIONS
Sandri, D., Silver, G., Trazo, R., 2000, “Design, Construction, and Monitoring of a 14.9M High Geosynthetic Reinforced Segmental Retaining Wall in a Seismically Active Region”, ASCE Geotechnical Special Publication (GSP) “Advances in Transportation and Geoenvironmental Systems using Geosynthetics”.

Silver, G., Van Thiel, D., 2006, “Permanent Deflection and Performance Study of Drivable Grass”, Published in Stormwater Magazine 2007 and Stormwater Solutions Magazine – 2008.

Shlemon, Roy J., Davis, Paul, and Silver, Gregory, 2008, “Relative Activity of North Branch Splays (NBS) of the Newport-Inglewood Fault Zone, West Newport Oil Field, Newport Beach, CA”.

Silver, Gregory, Bates, Lisa, 2013, “Landslide Stabilization Using High Strength AggregateCement Slurry”, ASCE/Geo Institute 2013 Geo-Congress: Stability and Performance of Slopes and Embankments III, Geotechnical Special Publication No. 231.

Bastani, A., Silver, G., Atkinson, D., 2014, “CPT Based Settlement Prediction Over CA Soft Rock, CPT-14 – 3rd International Symposium on Cone Penetrometer Testing.

Bastani, A., Silver G., 2017, “CPT Based Settlement Prediction Over CA Soft Rock, Stiff Alluvium and Soft Alluvium Sites” – International Foundation Congress and Equipment Expo (IFCEE) 2018.

Farrington, Katie M., Silver, Gregory P., Varni, Ashley A., 2024, “Coastal Erosion-Induced Landslide in South Orange County”, ASCE/Geo Institute 2024 Geo-Congress: Geotechnics of Natural Hazards, Selected Papers from Sessions of Geo-Congress 2024, Geotechnical Special Publication No. 349.
646
2025 SCHEDULE OF CHARGES

PROFESSIONAL SERVICES
Document Preparation and Project Services $ 110.00/hour CAD/GIS Design Engineer $ 132.00/hour
Staff Engineer or Geologist $ 175.00/hour
Senior Staff Engineer or Geologist $ 192.00/hour
Project Engineer or Geologist $ 215.00/hour
Senior Engineer or Geologist $ 255.00/hour
Associate Engineer or Geologist $ 272.00/hour
Principal/Director $ 295.00/hour

FIELD INSPECTION & TESTING SERVICES
Staff Engineering Technician $ 110.00/hour*
x Services provided under direct supervision of a Senior Engineering Technician Senior Engineering Technician $ 130.00/hour*
x Inspections for soils/grading, asphalt, concrete, batch plants, piles/caissons, etc. x Certifications by ACI, ICC, Caltrans, local jurisdictions, etc.

Registered Special Inspector (No 4-hour minimum) $ 130.00/hour* x Certifications by ACI, ICC, Caltrans, local jurisdictions, etc. x Reinforced concrete, Post-Tension, Masonry, Welding, Bolting, Fireproofing Instrumentation Engineer $ 175.00/hour
x Slope inclinometer and Piezometer monitoring
x Manometer for floor-level surveys
x Stormwater turbidity & pH meter
x Groundwater monitoring - pressure transducer, datalogger, water chemistry meter, etc. x Pipeline video camera for drains, wells, etc.

Engineering Seismological Technician (includes 3-channel seismograph) $ 175.00/hour x Blast vibration monitoring
x Construction vibration & noise monitoring (pile driving, drilling, demolition, etc.) *Notes:
(1) Rates include vehicle, nuclear density gauge, and equipment for testing, inspection, and sampling. (2) No 4-hour minimum charges apply, except for night work. (3) Overtime is charged at 1.5 times the base rate. Overtime is defined as time worked on the project in excess of 8 hours per day and all time on Saturdays, Sundays, and holidays. (4) Prevailing Wage projects, additional hourly surcharge for Field Personnel per CA Labor Code §1720, et seq. Add $ 39.00/hour

LABORATORY TESTING SERVICES
Laboratory Testing $ 142.00/hour
(For special materials testing and laboratory costs on a per-test basis, see GMU’s Laboratory Fee Schedule)

OTHER CHARGES
Outside Services Cost + 15%
Reimbursables & Reprographics Cost
647
On-Call (As-Needed) Geotechnical
Plan Check Services
Submitted to Submitted by
January 21, 2025
2600 Michelson Drive | Suite 400
Irvine, CA 92612
Attachment 8
648
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services Table of Contents

1. Cover Letter ď

2. Background and Approach Đ

3. Methodology đ

4. Work Plan Ē

5. Project Organization and Staffing ĕ

6. Related Experience ė

7. Sample Plan Review Correction Lists & Forms ďď

8. Project Schedule ďď

9. Cost Data ďĐ

10. Statement of Compliance ďĐ

11. Other Information ďĐ

12. Non-Discrimination ďĐŔ
Appendix 1: Resumes
Appendix 2: Sample Plan Review Correction Letters
649
2600 Michelson Drive | Suite 400
Irvine, CA 912612
+1 949.250.1421.

Verdantas.com

1. Cover Letter
City of San Clemente
910 Calle Negocio, Suite 100 January 21, 2025
San Clemente, CA 92673
Attn: Mr. Zak Ponsen, PE, Assistant City Engineer
Subject: Response to Request for Proposal for On-Call Geotechnical Plan Check Services

)- .+*). /*/# $/4*!
)' ( )/ շ.  ,0 ./!*--*+*.
'֢֣լ -
)/
.
)
ի֢!*-( -'4
$"#/*)
*).0'/$)"լ
)
ի֣$.+'
. /*+- . )//#$.+-*+*.
'/*+-*1$  */
#)$

''
)#
& -1$
.ի
 0) -./
)/#
//# $/4$.. &$)"+-*+*.
'.!-*(,0
'$!$ *).0'/
)/./*+ -!*-(
.և)
" */
#)$

'- 1$ 2. -1$
.*!+-*%
/+'
).
).*$'- +*-/.- '
/ /*.0
$1$.$*)(
++-*
..$)"լ"-
$)"
+'
).
)
..*
$
/ 
*)./-0
/$*)$(+-*1 ( )/.!*-- .$ )/$
'լ
*(( -
$
'լ$)0./-$
'լ+0
'$
+-*%
/.լ
./- /$(+-*1 ( )/.լ
)'
).'$ +-*%
/.*!
''.$5 .ի  -
)/
.#
.(*- /#
).$3

.*! 3+ -$ )

+-*1$$)"/# . . -1$
./*(0)$
$+
'
'$ )/./#-*0"#*0/-
)" *0)/4լ.0

..!0''4(
)
"$)"(*- /#
)
ԶԺԵ*)և

''+0
'$

" )
4
*)/-

/.!*-
$/$ .լ
*0)/$ .լ
)+0
'$

" )
$ .$)
'0$)")
# $(լ 2+*-/


#լ 0)/$)"/*)

#լ*./
 .
լ
-1$) լ$..$*)$ %*լ

& *- ./լ
)
*.)" ' .ի
)
$/$*)/**0-
/
(շ.$)/$(
/ &)*2' " *!'*

'" *'*"$
֨" */
#)$

'
*)$/$*).
)+-*1$$)"" */
#)$

'+'
)- 1$ 2
!*-
''(
)) -*! .$")
)
*)./-0
/$*)+-*%
/.լ2 
'.*#
1 

.*! 3+ -$ )
 1
'0
/$)"'
).'$ .

)
*
./
'
'0ʯ -*.$*)֨- /-
/֨./

$'$/4 2#$
#(
4
*!.+
$
'$)/ - .//*/# $/4ի
0-. -1$
.2$''
(*
$'$5 +-$(
-$'4!-*(*0-
-1$) *ʯ$


)2$''
' 
4 )$*--$)
$+
')"$) -
)
4*)/

/ !*-

4և/*
4
*((0)$

/$*)2$/#/# $/4լ%
)#
)-
լլի
%
)$.

'$!*-)$
- "$./ - -*! ..$*)
'$1$'
) */
#)$

'
)"$) - 2$/#ԸԻ4
-.*! 3+ -$ )
. -1$)"(0)$
$+
'$/$ .

-*.. -
)" 
)
*.)" ' . *0)/$ .ի 2$''
.0++*-/ 
4*0- .&$'' /
(*! - "$./ - +-*! ..$*)
'.լ

''*!2#*(#
1 /# - ' 1
)/ 3+ -$ )

)'*

'!
($'$
-$/4)  /*.0++*-//# $/4*)
!0''1
-$ /4*!
+'
)- 1$ 2.2$/#$)
"- /0-)
-*0)/$( .ի
 
++-
$
/ /#$.*++*-/0)$/4/*+- . )/*0-,0
'$!$

/$*).
) 3+ -$ )
/*/# $/4*!
)' ( )/ ի0-
+-*+*. +-$
2$''
1
'$!*-
+ -$**!ԾԵ

4.ի
!4*0#
1 
)4,0 ./$*).

*0/*0-. -1$
.*-/#$.
+-*+*.
'լ+'
. *)*/# .$/
/ /*
*)/

/0.ի '**&!*-2
-/*2*-&$)"2$/#/# $/4ի
 .+
/!0''4.0
($// լ

ի
Kristen Williams
Area Leader - West
Djan Chandra, PE, GE
Primary Contact | Senior Principal Engineer
949.681.4267 | [email protected]
LOCAL OFFICE: ԷԻԵԵ$
# '.*)-$1 լ0$/ ԹԵԵլ

-1$) լԾԷԻԶԷ ֩ԾԹԾիԷԺԵիԶԹԷԶ
650
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services

2. Background & Approach
 -
)/
.
)
ի֢ -
)/
.֣$.
) )"$) -$)"!$-( $

/ /*
+-*1$$)"*0-
'$ )/.2$/# 3+ -/$. $) )"$) -$)"
*).0'/$)"լ
/#  )1$-*)( )/լ
)$/..0++*-/$)"$)!-
./-0
/0- ի -
)/
.
#
."-*2) 3+*) )/$
''4$)/# '
./!*0-4
-.լ./-
/ "$

''4

,0$-$)"!$-(.$)
'0$)"*0/# -)
'$!*-)$
շ.+- ($ -
" */
#)$

'
*).0'/
)/լ
$"#/*)*).0'/$)"լ
)
ի$/#/# 

$/$*)*!
$"#/*)շ.' "

4/
(լ -
)/
.#
./# 

1 )/
" *!(*- /#
)ԻԸ4
-.*! 3+ -$ )
 '$1 -$)"
$)0./-4և'
$)"" */
#)$

' )"$) -$)"լ )1$-*)( )/
'

*).0'/$)"լ
)(
/ -$
'./ ./$)"
)$).+
/$*). -1$
./*
'*

'
*((0)$/$ .ի
 #
1 
*(+' / /#*0.
).*!+-*%
/.$)/# 
)
' ( )/ - "$*)լ 1 '*+$)"
1
./
/

. *!" *'*"$

)
" */
#)$

'
*)$/$*).լ2#$
#$.
1 $'

' /* -
)/
.շ
)"$) -.
)" *'*"$./.ի0-.0

..!0'
*(+' /$*)*!
+-*%
/.*!(*- /#
)ࡂԶ$''$*) $)
*)./-0
/$*)1
'0 լ
)
*1 -ԺԵ
2 -.!*- )"$) -$)" 3
'' )

- +-**!*!*0-
0) -./
)$)"*!/# $(+*-/
)
*!+-*1$$)""**. -1$
լ
*)և/$( 
)*)և
0" /!*-
)4.$5 +-*%
/լ/*.0./
$)
'*)"և/ -(- '
/$*).#$+2$/#*0-
'$ )/.ի 
'.*
#
1 3/ ).$1 '*

'&)*2' " *!-
)" *0)/4" *'*"4լ- "0'
/*-4
" )
$ .լ
)'*

'լ./
/ լ
)
!  -
'
* .)
..
-4/*& +4*0-+-*%
/.(*1$)"!*-2
-ի
Geotechnical Plan Check Services
 0) -./
)/# $(+*-/
)
*!" */
#)$

'+'
)
#
&$)+-*/
/$)"/# $)/ - ./.*!/# $/4
)*/# -
./
& #*' -.ի0- 3+ -$ )

)+-

/$

'&)*2' " *!
++'$

' ./
)
-.
)
* - ,0$- ( )/.2$''
4$ '
-$/$

'/$( .
1$)".2# ),0$
&/0-)
-*0)$.
)
..$/4ի -
)/
.#
.
)+-*1$$)"" *'*"$

)
" */
#)$

' )"$) -$)". -1$
.!*-+0
'$
2*-&.լ- .$ )/$
'լ
)
*(( -
$
'+-*%
/.!*-*1 -ԻԵ4
-.ի
. /# " */
#)$

'
*).0'/
)/և*!և-
*-*)/# . +-*%
/.լ2 &)*22#
/$.- ,0$- /*$)1 ./$"
/ 
.$/ լ
+- +
- 
++-*+-$
/ -
*(( )
/$*).լ
)(*)$/*-/# $(+' ( )/
/$*)*!/#*. -
*(( )
/$*).!*-
.0

..!0'+-*%
/
*(+' /$*)ի 0- 3+ -$ )
$)
'0 .
) 3#

0./$1 '$./*!
*(( -
$
'լ- .$ )/$
'լ
$)0./-$
'լ-*
2 42$ )$)"լ'
).'$ ($/$"
/$*)
).'*+ - +
$-լ./*-(-
$)լ
). 2 -
)2
/ -
+-*%
/.ի
 -
)/
.շ " */
#)$

' .$")և- '
/ 2*-&+-*1$ .0.2$/#
) !!
/$1 

&"-*0)*!$1 -. 
3+ -$ )
/*0) -./
)+-*%
/ ' ( )/.
)/# 2*-&+ -!*-( 
4*/# -.լ )

'$)"-
.*)

' լ
/$( '4լ
)
++-*+-$
/ - 1$ 2.ի -
)/
.#
.+-*1$ +'
)
#
&. -1$
.!*-(
)4*!*0-
'$ )/.լ
$)
'0$)"/# $/$ .*!)
# $(լ$
(*)
-լ
*)"

#լ 2+*-/

#լ
)
'

.
.լ
)(
)4
/-
).+*-/
/$*)֨2
/ -
" )
$ .լ.0
#
. /-* *'
$) **/#$''3/ ).$*)*)./-0
/$*)0/#*-$/4
)
$1 -.$ *0)/4'***)/-*'
)
/ -*). -1
/$*)$./-$
/ի # 
) !$/*! -
)/
.շ 3+ -$ )
$.
!*0) *)
*/#*0- .$")
)- 1$ 2 3+ -$ )
2$/#/# . 
)*/# -+0
'$

" )
$ ./#-*0"#*0//# 
.*0/#'
)ի
Company Name
VERDANTAS INC.

California Corporation
Formerly Leighton Consulting, Inc.

Years in Business
63 years
Project Manager | Primary Contact
Djan Chandra, PE, GE, Senior Principal Engineer
949. 681.4267 | [email protected]
Office Locations
Irvine (HQ) | Irvine (Lab) | Rancho Cucamonga |
Temecula (Office + Lab) | San Diego (Office +
Lab) | Santa Clarita | Victorville | Palm Desert
2651
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services 0-. -1$
և*-$ )/ 
++-*

#$(+' ( )/./# !*''*2$)"խ
 ) -./
)$)"
)$(+' ( )/$)"/# $/4շ."*
'.լ1
'0 .լ
)$)/ - ./.!*-/# - 1$ 2+-*
..

*/#" ) -
''4
)*)
+-*%
/և.+
$!$


.$.ծ
 ) -./
)$)"- ' 1
)/+-*%
/և.+
$!$
 .$")*
%
/$1 .
)$)/ - ./.*!/# 
++'$

)/
)$/.
" */
#)$

'
*).0'/
)/ծ
 *).0'/$)"2$/#$/4- +- . )/
/$1 .- "0'
-'4- "
-$)"/# - 1$ 2+-*
..
*/#" ) -
''4
)*)

+-*%
/.+
$!$


.$.ծ

1$)"& 4./
!!-
$'4
1 $'

' /*
// )$/4*0)
$'լ'
))$)"*(($..$*)*-
$/4./
!!
( /$)".ծ
)լ
 -*1$$)"
)

..$
' 
)$)/ -

/$1 - 1$ 2+-*
..2$/#/# 
++'$

)/շ." */
#)$

'

*).0'/
)//#
/
*)/-$
0/ .
.*0)+-*%
/ .$")$)
) 3+ $/$*0.
)
**+ -
/$1 (
)) -ի
#$.
++-*

# )
*0-
" .
**+ -
/$*)լ
*((0)$

/$*)
) !!$
$ )
4
/2 )$/4- +- . )/
/$1 .լ/# 
$/4շ." */
#)$

'- 1$ 2 -լ
)/# 
++'$

)/
)$/." */
#)$

'
*).0'/
)/ի# . -1$
և*-$ )/ 

++-*

#$.
++'$ 
*(( )
$)"2$/#/# +-*%
/
++-*1
'+-*
..լ0-$)"
*)./-0
/$*)լ
)
//# 

*(+' /$*)*!
*)./-0
/$*)լ
.$-
/ 
4$/4- +- . )/
/$1 .ի'/$(
/ '4լ/#  .$- - .0'/*!/#$.

++-*

#$./*+-*/
//# $/4շ.$)/ - ./.
4 1 '*+$)"
' 1 '*!
*)!$ )
/#
//# 
*).0'/
)/շ.

++'$

)/#
.( /*- 3
/# ($)$(0(- ,0$- ( )/.*!/# 
'$!*-)$
0$'$)"* 
)
)
' ( )/ 0)$
$+
'* 
4+-*1$$)"
-
.*)

' ' 1 '*!.
! /4լ+0
'$
#
'/#
)" ) -
'2 '!
- !*-
/# +-*%
/*
%
/$1 .ի

3. Methodology

#)$

' 3+ -/$. 
*(
$) 2$/#- ' 1
)/+-*%
/ 3+ -$ )
$.
-$/$

'!*-
" */
#)$

'
*).0'/
)//*
+-*1$ - 1$ 2. -1$
./*/# $/4*!
)' ( )/ ի -
)/
.շԻԸ4
-.*! 3+ -$ )
2*-&$)"$)*0/# -)

'$!*-)$
*)
2$ 1
-$ /4*!+-*%
/. (*)./-
/ ./#  3+ -$ )
- ,0$- /*+-*1$ /# . . -1$
.ի
 (
$)/
$)
)0+և/*և
/ &)*2' " *!./
)
-
* .
)- "0'
/$*).լ.0
#
./#*. 
*)/
$) $)/# 

'$!*-)$
0$'$)"* լ- )
**&լ
'$!*-)$
 *'*"$

'0-1 4֢֣*/ ԹԶլ0$ '$) .!*- 1$ 2$)"
 *'*"$
 +*-/.
)+
$
'0
'$

/$*)ԶԶԼլ
)' ( )/ 0)$
$+
'* 
)*0)/4*!-
)"
0$ '$) .!*-- +
-
/$*)*! */
#)$

' +*-/.ի# . 
- 
-$/$

'/* 1
'0
/$)"/# 
,0

4*!.$/ 
" */
#)$

'./0$ .!-*(/# ./
)+*$)/*!" *'*"$

)" */
#)$

'./
)
-*!+-

/$

)!*-
* 

)*-$)
)

*)!*-(
)
ի -
)/
.(
$)/
$).
) 3/ ).$1 $)և#*0. '$
-
-4*!" *'*"$
- +*-/.
)
#$./*-$

-$
'+#*/*"-
+#.*!/# - "$*)/*- ! - )

.+
-/*!*0-- 1$ 2+-*
..ի 
'.*
*).$ -+
./

)+- . )/.$/ 
*)$/$*).լ*0-*2) 3+ -$ )

)"** )"$) -$)"%0"( )/$)
*)0
/$)"*0-- 1$ 2ի
 0) -./
)/# ) /*+-*1$ - .+*).$1 - 1$ 2. -1$
.ի #
1 /# /
#)$

'./
!!
1 $'

' /*
+-*1$ - 1$ 2. -1$
.
)/*( //# ) .
)/$( - ,0$- ( )/.*!/# $/4ի0-./
!!

)
'.*
+ -!*-(.$/ 1$.$/.0+*)- ,0 .//*- 1$ 2.$/ 
*)$/$*).ի 2$''
"$)*0-- 1$ 2
..**)
.+*..$
' 

!/ --
$1$)")*/$!$

/$*)/#
/+'
)
#
&.0
($//
'.
- 
1 $'

' 
)2$''
*(+' / (*./- 1$ 22*-&
2$/#$)ԶԵ2*-&

4.!*-!$-./.0
($//
'.
)Ժ2*-&

4.!*-.0
. ,0 )/+'
)
#
&.ի

-" -*-(*- 
/
#)$

''4
*(+' 3+-*%
/.(
4- ,0$- 
$/$*)
'/$( ի 2$''$.

0../# . .+
$
'+-*%
/.2$/#4*0
*)


. և
4և

. 

.$.ի
3652
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services QA/QC Program and Procedures
)

#+-*%
/լ -
)/
. (+'*4.. 1 -
''
4 -.*!0
'$/4..0-
)
+-*
0- ./* ).0- 
# - )
/*
/# +-*%
/շ."*
'.լ
0" /.լ
).
# 0' .լ
)/*(
$)/
$)/# #$"# ./,0
'$/4/
#)$

'
/
ի -
)/
.
#
.2-$// )+*'$
4
)+-*
0- ./*$(+' ( )/,0
'$/4
*)/-*'֨,0
'$/4
..0-
)
֢֣֨ի#$.+*'$
4
(
)
/ .
+'
)

0./*($5 /*/# .
*+ *!. -1$
.!*- 1 -4+-*%
/լ
)$)
*-+*-
/ .
0$/.լ

#
&'$./.լ
)!

&ի0+ -1$.*-4- .+*).$
$'$/4!*-/#$.
.+
/*!/# +-*%
/2$''
1 ./ $)
-$)
$+
'.$)#
-" !*-/#$.
*)/-

/ի+-*+-$ /
-4
)
*+4-$"#/ 
*+4*!/#$.+*'$
4

)
+-*1$ /*
/# $/40+*)- ,0 ./ի
0-,0
'$/4
*)/-*'+-*"-
(.4./ (
/$

''4 (+'*4.(
.0- ./* ).0- 
*)!*-(
)
/*+-*%
/
)
'$ )/
- ,0$- ( )/.ի
)!

/լ*) *!*0-.+
$!$

*-+*-
/ *
%
/$1 .$./*(
$)/
$)
#$"#./
)
-*!

#$ 1 ( )/
4$(+' ( )/$)"
+-*%
/+#$'*.*+#4/#
/
*)/$)0*0.'4 (
).*0/./
)$)"/
#)$

'
+ -!*-(
)

)

*(($/( )//* /
$'ի0-֨.4./ ($.$(+' ( )/ /*+-*1$ /# #$"# ./' 1 ' *!
*)!$ )
/#
/
#$"#./
)
-*!

#$ 1 ( )/
)
*)0
/$. (*)./-
/ $)/# /
(շ.2*-&
+ -!*-(
)
ի# -*%
/
(մ.,0
'$/4
..0-
)
֨,0
'$/4
*)/-*'
++-*

#$)
'0 ./# !*''*2$)"խ
 - ,0 )/
)$-
/
*((0)$

/$*)2$/#*0-
'$ )/ծ
 '
-$ )/$!$

/$*)*!/
.&*
%
/$1 .ծ
  '
/$*)*!/# (*./,0
'$!$ + -.*)) '!*-.+
$!$ /
.&.ծ
  '
/$*)
)
++'$

/$*)*!+-*1 ).4./ (
/$

/


,0$.$/$*)
)
)
'4.$./
#)$,0 .ծ
 )"*$)"- 1$ 2*!
/
/*
*)!$-(
++-*+-$
/ 
)
,0
/ 0. *!( /#*./*( //
.&
*
%
/$1 .ծ
 ++'$

/$*)*!*
0( )/ ,0
'$/4
*)/-*'(
.0- .!*-
/

*''
/$*)
)
)
'4.$.ծ
 *(+'$
)
2$/#./
)
-$5 !$ '+-*
0- .լ
.*
0( )/ $)2-$// )!$ '+-*
0- .(
)0
'.ծ
 -$// )*
0( )/
/$*)
)-
*-$)"*!/# 

*1 $/ (.ծ
 *(+' / 
*(+'$
)
2$/#
''
++'$

' - "0'
/*-4
" )
4- ,0$- ( )/.
)"0$ '$) .ծ
)
 *-(
'+-*%
/- 1$ 2( /$)".$)2#$
#/# 
*)0
/
)2*-&+-*0
/.*!/# -*%
/
(
- 
- 1$ 2 
) 1
'0
/ 
4. )$*-+ -.*)) '2$/# 3/ ).$1  3+ -$ )

).
.*) %0"( )/ի
- ,0 )/
(( /$)".
''*2$)"!*-$-
/
*((0)$

/$*)
/2 )
''$)1*'1 + -.*)) 'ի
1 -4+-*%
/(
)
" -
/ -
)/
.#
.

../*$)և#*0. +-*+-$ /
-4+-*%
/(
)
" ( )/
)!$)
)
$
'
.*ʲ2
- լ2#$
#
''*2.!*-)
--
'/$( (*)$/*-$)"*!+-*%
/
0" /լ# '+$)"*0--*%
/
)
" -.& +
/$( '4
)

0-
/ 
*./
*)/-*'*!/# $-+-*%
/.ի 2$''
*((0)$

/ 2$/#/# $/4
.)  լ(*)/#'4

/
($)$(0(լ/*$.

0..+-*%
/./
/0.լ
" )
4- ,0$- ( )/.լ.
# 0' լ
)
)4
)/$
$+
/ .
*+ 

#
)" .ի#$.+-*1$ .4*0-./
ʯ2$/#/# /**'./*(
)
" 

/0
'+-*%
/
*./.ի
)
$/$*)լ/*# '+
*)/-*'
+-*%
/
*./.լ2 2$''$)/ -)
''4- 1$ 2*0-+-*%
/./
ʯ$)"*)
- "0'
-

.$.!*-*+/$(
'./
ʯի

4. Work Plan
# +0-+*. *!*0-" */
#)$

'- 1$ 2$./* 1
'0
/ $!/# " */
#)$

'- +*-/֢.֣!*-
+
-/$
0'
-+-*%
/
2 - +- +
- $).0
./
)/$
'
*(+'$
)
2$/#/# ./
)
-*!

- 
)$!/# -
*(( )
/$*).
- %0" 
4653
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services

++-*+-$
/ !*-/# +-*+*. +-*%
/ի0-.
*+ *!. -1$
$." ) -
''4 3+
/ /*
*).$./*!/# !*''*2$)"
/
.&.խ
  1$ 2 *! + -/$) )/ 3$./$)"" */
#)$

'(
+.
)- +*-/.
1 $'

' $) -
)/
.շ$)և#*0. 
'$
-
-4լ/# +0
'$
*(
$)
)/# " */
#)$

'- +*-/֢.֣+- +
- !*-/# +-*+*. +-*%
/ի
)*0-
- 1$ 22 2$'''**&!*-
,0

4 *!/# 

&"-*0)- .
-
#լ!$ '
/

*''
/$*)+-*
..
$)
'0$)"" *'*"$
(
++$)"
))0(
-
) +/#.*! 3+'*-
/*-4
*-$)".լ
)'

*-
/*-4/ ./$)"
+-*"-
(ի
 1
'0
/$*)*! /# 
/
$)/ -+- /
/$*)լ
++-*

#
)( /#*$) 1 '*+$)"-
*(( )
/$*).!*-
/# +-*+*. +-*%
/լ$)
'0$)". $.($
 .$")+
-
( / -.լ'$,0 !

/$*)
)'
).'$ #
5 -.լ
!*0)
/$*) .$")լ+
1 ( )/ .$")լ
-/#2*-&լ
).'*+ $(+-*1 ( )/.ի
 $/ -
*))
$..
)
/**
. -1 
0-- )/.$/ 
*)$/$*).լ 3+*. .*$'.
)
*)./-0
/$*)+-*"- ..լ$!
( 
++-*+-$
/ ի
  /$)"2$/#4*0
)/# +-*%
//
(/*+- . )/*0-!$)$)".լ$! ( 
++-*+-$
/ ի
 - +
-
/$*)*!
'$./*!- 1$ 2
*(( )/.+- . )/ $)
!*-(
/!*-
. *!- 1$ 2
)- .+*). 
4
/# ++'$

)/ի
!- ,0 ./ լ2 

)!$-./.0
($/
-
ʲ1 -.$*)*!*0-- 1$ 2
*(( )/.!*-4*0-
- 1$ 2
)
*(( )/*)#$"#և+-*!$' +-*%
/.ի
 - +
-
/$*)*!
- 1$ 2
*(( )/' // -!*-.0
($//
'/*/# ++'$

)/ի
 // )
)

/

*(( )/- .*'0/$*)( /$)"֢$!- ,0 ./ ֣2$/#/# - +- . )/ /$1 .*!/# $/4

)++'$

)//*
).2 -,0 ./$*).
*)
-)$)"*0-- 1$ 2
*(( )/.ի
Providing Timely & Cost-Effective Services
 -
)/
.$.2 ''և./
!! 2$/#. 1 -
''*

'*!!$
.
)
'
-" 

)
#*!
-/$!$ +-*! ..$*)
'./#
/

)#
)' !'0
/0
/$*).$)
2*-&'*
ի*-/4+$

'+-*%
/.լ*0-./
)
-/0-)
-*0)/$( 
!*-+'
)
#
&- 1$ 22$''!*''*2/# /$( !-
( .$)/# ծ$ի իլ
ԶԷ2*-&$)"

4.!*-Զ./ - 1$ 2
)Լ2*-&$)"

4.!*-Է)
)
.0
. ,0 )/- 1$ 2ի*- ( -" )
4+-*%
/.լ.0
#
. ( -" )
4
- +
$-.*! -*.$*).լ'
).'$ .լ!'**$)"լ
)
-/#,0
& 

(
" .լ2 #
1 /# 

+

$'$/4
)- .*0-
./* 3+ $/ /# 
- 1$ 2+-*
..ի 2$''
"$)
4/#*-*0"#'40) -./
)$)"/# 
+-*%
/
)$(( $
/ '4
-
&$)"/# +-*%
/ ' ( )/.
)- ,0$- ( )/. *2)$)/*/
.&.2$/#
'
-
($' ./*) .
)
'$) .լ ).0-$)"+-*"- ..

)
(
.0- 
)
%0./( )/.(
$!)
..
-4ի
.&.
2$''
+-$*-$/$5 

. *)/# $-$(+*-/
)
/* ).0- 
-$/$

'
*(+*) )/.
- 
- .. !$-./2$/#
-
'$./$
 ./$(
/ .*!/$( !-
( .
*).$ -$)"/# +*/ )/$
'
#
'' )" .
)
0!! -/$( !*-0) 3+
/ 
'

4.ի 2$''
*((0)$

/ - "0'
-0+
/ ./#-*0"#1$-/0
'( /$)".լ

''.*- (
$'./*& +
./
& #*' -.$)!*-( 

*0/+-*"- ..լ
)
)4$..0 . )
*0)/ -  *-
)/$
$+
/ ի (
$)/
$)- "0'
-
2*-&#*0-.
)2$''

1 $'

' /*- .+*)/*,0 -$ .
)!

&+-*(+/'4/* ).0- .(**/#

*((0)$

/$*)!'*2ի
# 
*//*('$) $./#
/2 2$''
.. (
' 
+-*%
//
(/#
/

)+ -!*-(/# .
*+ *!2*-&(*./ !!$
$ )/'4

)
*./ !!
/$1 '4ի.+
-/*!/#$.(
)
" ( )/լ2 2$''

*((0)$

/$)"2$/#/# $/4լ.*2 
0) -./
)2#
/+-*%
/.
# 0' ./*
)/$
$+
/ ի#$.
''*2.0./* ).0- ./
!!
*)/$)0$/4/#-*0"#+-*%
/
'$1 -

' .
)
''*2.0./*.*'1 
*)!'$
/.
!*- /# 4
-$. ի 0) -./
)/# 1
'0 *!+ -.*)) '
Electronic Plan Review
Software is another means
of providing fast and costeffective services.

Verdantas is well-versed in using
platforms like Bluebeam and E-Plan
Review (EPR) to provide correction
lists to our municipal clients.
5654
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services

*)/$)0$/4!*-
.+
$!$
+-*%
/ի 2$''!0''4' 1 -
" *0-*!!$
'*

/$*)./*4*0-
1 )/
" ի0-
+-*! ..$*)
'./
!!#
."-*0)-0' . ./

'$.# !*-
*(+
)4և2$ .0++*-/
)+-*
0- .!*-.0

..!0''4
'$1 -$)"" */
#)$

' )"$) -$)". -1$
.ի
Collaboration with Multiple Stakeholders
.+
-/*!*0-+#$'*.*+#4լ2 
'$ 1 $)
-
/$)"
ո /-0 +
-/) -.#$+չ2$/#*0-
'$ )/./*( /*- 3
/# $-
*
%
/$1 .
) 3+
/
/$*).ի   * /#$.
4
*''

*-
/$)"
'*. '4 2$/# (0'/$+'  ./
& #*' -.լ *0- +0
'$


'$ )/.շ 1
-$*0.
$/4  +
-/( )/.լ
) - .$ )/.
)  1 '*+ -. /#-*0"# +-*

/$1 
) !!
/$1 

*((0)$

/$*)+-

/$
.ի#$.$)
'0 ..
# 0' 
)- .+*).$1 ) ..
) $(+' ( )/$)"*0-$)/ -)
',0
'$/4

*)/-*'
)
..0-
)
*!*0-. -1$
.
) '$1 -

' .ի -
)/
.շ
++-*

#$./*2*-&
'*. '42$/#/# $/4

)4*0-
*).0'/
)/./*$.

0..+-*%
/- ,0$- ( )/.
)+-*

/$1 '4
- ..
)4!*- .

' $..0 .$)

/$( '4(
)) -/*+- 1 )/
)4+-*%
/.
# 0' - '
/  '

4.ի
 -
)/
.

)
'.*
..$./2$/#
1
-$ /4*!
*((0)$/4*0/-

#
)+0
'$
- '
/$*).. -1$
./*# '+$)!*-(
/#  +0
'$

) "
$) $)+0/
) .0++*-/ !-*( /# 
*((0)$/4 $! )
..
-4ի '/#*0"# " */
#)$

' - 1$ 2
. -1$
.*)*/" ) -
''4
*).$./*!+0
'$
*0/-

#. -1$
.լ -
)/
../$''./
).-
4/*# '++'
)!*-
)
$(+' ( )/+0
'$
 0

/$*)լ*0/-

#լ
)+
-/$
$+
/$*)

/$1$/$ .ի*( *!/# 2*-&2 #
1 +-*1$ $)
/# +
./$)
'0 .խ
 
-/$
$+
/$)"$)
*)1 -.
/$*).
)( /$)".2$/#'*

'*!!$
$
'.լ+-*+ -/4*2) -.լ
$/$5 ).լ'*

'

*((0)$/4

/$*)"-*0+.լ
$1$
*-"
)$5
/$*).լ

0.$) ..'
-.լ
)*/# -./
& #*' -.
.
+և
+-*+-$
/ լ/*"
$)$)+0/*).$/ .+
$!$
$..0 .լ
)
#
'' )" .ծ
 * -
/$)"+0
'$
( /$)".լ$)!*-(
'
*((0)$/4( /$)".
)!

$'$/
/ 
1$.*-4"-*0+
$.

0..$*).ծ
 - +
-$)"+0
'$
)*/$
.
)) 2.- '
. ./*
))*0)
+0
'$
( /$)".
)
-/
$)+-*%
/

/$1$/$ .ծ
 - +
-$)"
)+- . )/$)"(0'/$և( $
+- . )/
/$*).
)+- +
-$)"!

/.# /.լ
-*
#0- .
)֨*-
$)/ -) /
*)/ )/!*-+-*%
/

/$1$/$ .ծ
 - +
-$)"
)$(+' ( )/$)"
*((0)$/4- '
/$*).+'
).ծ
)
  1 '*+$)"& 4( ..
" .!*-'*

'*!!$
$
'.ի
Key Deliverables
 -
)/
.
*(($/./*+-*1$$)"
''. -1$
.2$/#$)/# 
"- 0+*)/0-)
-*0)/$( .ի 
'.*
*(($//*
+-*1$$)"/# - ,0 ./  '$1 -

' .$)
'0$)"խ
Զի
)!*-($)" ./
!!*!
)4+*/ )/$
'
*)!'$
/.*!$)/ - ./*)
+-*%
/
Էի  -!*-($)" " */
#)$

'֨" *'*"$

'.*$'.- +*-/- 1$ 2.
.)
Ըի 0
($//$)"
'
-
)
*)
$. 
*--
/$*)'$./$)
)
++-*1 !*-(
/*-1$
 '
/-*)$
+'
)- 1$ 2
.*!/2
- /*/#  1 '*+( )/
/$*)*!/# 0
'$
*-&. +
-/( )/!*-$./-$
0/$*)/*+-*%
/

++'$

)/֨ .$") -
Թի  .+*)$)" /*/ ' +#*) $),0$-$ .!-*($/4./
!!
)+ -($/
++'$

)/.- "
-$)"- 1$ 2

*(( )/.
6655
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services Ժի // )$)" ( /$)".
/$/4*!!$
.*-$)/# !$ '
//# +-*%
/'*

/$*).
.
++-*+-$
/
Իի ..$./$)"2$/# ( -" )
4'
)$)./

$'$/4$)1 ./$"
/$*).
.)
..
-4
Լի  -!*-($)" Է)
).0
. ,0 )/ - 1$ 2.*)+-*%
/./* ).0- +'
)
*--
/$*).#
1 
)- .*'1
.
/$.!

/*-$'4
Խի /
(+$)" +'
).ո
++-*1 չ!*-
*(+'$
)
2$/#
++'$

' 
* .

Ծի  /0-)$)"
++-*1 +'
)./* 1 '*+( )/
/$*)*!/# 0
'$
*-&. +
-/( )/*!!$

On-Site and Off-Site Work
 -
)/
. +-*+*. ./*+ -!*-(/# (
%*-$/4*!2*-&*!!և.$/ 
/*0-*!!$
'*

/$*)$)
-1$)

*0/ԷԼ($' .
!-*($/4
''ի0-/
(2$''

1 $'

' 0-$)"

0.$) ..#*0-.!*- (
$'.լ

''.լ
)1$-/0
'( /$)".
.
- ,0 ./ 
)$.!0''4 ,0$++ /*+-*1$  '
/-*)$
+'
)- 1$ 2/#-*0"#/# $/4շ.+- ! -- +'
/!*-(ի
)և.$/ +'
)- 1$ 2
)( /$)".
/$/4*!!$
.*-$)/# !$ '

)

--
)" 2$/#
1 )
)*/$

.
- ,0$- ի$/$*)
''4լ *) *!*0-+-*+*. /
( ( (
-.լ
!! 0''լլլ- .$ .$)/# $/4*!
)
' ( )/ 
)

)

1 $'

' ,0$
&'4!*-
)4 ( -" )
42*-&*-.#*-/և/0-)
-*0)*)և.$/ - ,0$- ( )/.ի

5. Project Organization and Staffing
Project Management Approach
 -
)/
.
*)0
/.+-*%
/(
)
" ( )/2$/#

*(
$)
/$*)*!.*!/2
- /**'.լ
*)/-*'(
.0- .լ
)
+-*
.. .լ$)
'0$)"2 ''և ./

'$.# .
# 0' 
*)/-*'./#
/
''*2*0-+-*%
/(
)
" -./*
'*. '4(*)$/*-
+ -!*-(
)

)+-*"- ..!*-.0

..!0'
*(+' /$*)2$/#$)/$( '$) .
)/*( /,0
'$/4./
)
-.ի# 
*0/'$) 
'*2$.


. '$) .)
+.#*/֨*0/'$) *!#*2 -
)/
.
*)0
/.+-*%
/(
)
" ( )/ *)
/# *)և

''
*)/-

/$.
2 - խ

)$/$
/ 
)
// )

$
&*!! /$)"/*( /2$/#/# $/4լ"
$)!0''+-*%
/0) -./
)$)"լ.
*+ 
)
3+
/
/$*).լ$)
'0$)".
# 0' լ
0" /լ.
! /4լ
)+'
).լ.+
$!$

/$*).լ
)- '
/ *
0( )/.

)- +*-/.ի
 ./

'$.#
)!*''*2
*((0)$

/$*)+'
)լ$)
'0$)"/$( '4)*/$!$

/$*)+-*/*
*'.!*-0)!*- .

' 
1 )/.*-$..0 .ի
 ./

'$.#
)
# - /*+-*%
/.
# 0' $)
'0.$1 *!./
-/
/ .լ0 
/ .լ
)+-*"- ..- +*-/.լ$!
)
..
-4ի
 -*1$ 1$
 (
$'+-*"- ..- +*-/.- "
-$)"

/$1$/$ .լ($' ./*) .լ.
# 0' լ
)
0" /ի
 0
($/$)1*$
./*
'$ )/*)
(*)/#'4

.$.ի
 0
($/+'
)
#
&
*--
/$*)'$./. + -
"- և0+*)+-*%
/.
# 0'
)( /#*ի
  -!*-(+-*%
/
'*. *0/+-*
0- .ի
*- !!
/$1 +-*%
/(
)
" ( )/
)/*/-

&2*-&+-*"- ..լ -
)/
.0/$'$5 . '/ &
)/
" +*$)/
֢
)/
" +*$)/֣/*(*)$/*-
)/-

&

-0 
#
-" .
"
$).//# +-*%
/
0" /
)/
.&+-*"- ..$*)

"
$)./+-*%
/($' ./*) .ի
7656
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services Organization Chart
 '*2 2 #
1 +-*1$ 
)*-"
)$5
/$*)
#
-/2$/#*0-+-*+*. /
($''0./-
/$)"/# !'*2*!
(
)
" ( )/
)*1 -.$"#/լ
.2 ''
.

#( (
-.շ- .+*).$
$'$/$ .ի
Project Manager and Key Contact
0--*%
/
)
" -
)/# $/4շ.
4*)/

/!*-/#$. )"
" ( )/2$''

%
)#
)-
լլլ )$*--$)
$+
')"$) -ի -ի#
)-
*!! -.(*- 
/#
)ԸԻ 4
-.*! 3+ -$ )
+-*1$$)"/0-)& 4" */
#)$

' )"$) -$)"

*).0'/$)". -1$
.լ$)
'0$)"/#$-+
-/4+ -- 1$ 2լ!*-/#  .$")
)

*)./-0
/$*)+#
. .*!
2$ 1
-$ /4*!+0
'$
$)!-
./-0
/0- +-*%
/.
/#-*0"#*0/*0/# -)
'$!*-)$
ի $.+-*%
/ 3+ -$ )
$.2$ -
)"$)"լ!-*(

*(( -
$
'֨- /
$'
)$)0./-$
'-  1 '*+( )/.լ(
./ -և+'
))

*((0)$/$ .լ
)(0)$
$+
'֨
$1$
!

$'$/$ ./*+  ./-$
)֨
$& /-
$'.լ
-*
2 4.լ#$"#2

4.լ
-$" .լ
)2
/ -$)!-
./-0
/0- ֢2
/ -լ2
./ 2
/ -լ

)./*-(
*)/-*'֣ի-ի#
)-
շ.
-
*! 3+ -/$. $)
'0 ./# 
)
'4. .

) .$")!*-+$' 
).#
''*2!*0)
/$*)լ+
1 ( )/լ.0
"-

./

$'$5
/$*)լ.'*+ ./

$'$/4լ- /
$)$)"./-0
/0- .լ
)'$,0 !

/$*)+*/ )/$
'
!*-1
-$*0./4+ .*!/-
).+*-/
/$*)+-*%
/.լ$)
'0$)"
-$" .
) )"$) -$)"
-/# )./-0
/0- .ի
$/$*)
''4լ# - 1$ 2.
*)./-0
/$*)+'
).
).+
$!$

/$*).
)1 -$!$ .
*)!*-(
)
/*
++'$

' 
(0)$
$+
'
)./
/ 
* - ,0$- ( )/.լ$)
'0$)"
'/-
).
)/
)
-+
$!$

/$*).!*-0
'$
*-&.
*)./-0
/$*)֢# - )
**&֣լ
)/# 
'$!*-)$
0$'$)"* ի-ի#
)-
(
)
" .
2$ -
)" *!
+-*%
/.լ
*/#.(
''և
)'
-" և.

'  .$")և
0$'+-*%
/.2$/#1
-4$)"" *'*"$

*)$/$*).
)

*)./-
$)/.լ2$/#$).
# 0' 
)
0" /ի
Djan Chandra, PE, GE
 )$*--$)
$+
')"$) -
 լ$1$')"$) -$)"
 լ$1$')"$) -$)"
 ԷԸԼԻ֩ԺԵԵԻԽ
8657
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services Hours Estimated and Availability
 '*22 #
1 +-*1$  ./$(
/ #*0-.
)
1 $'

$'$/4!*-*0-+-*+*. /
(ի 
..0( 

*0/ԶԵ
#*0-.*!./
!!/$( + - - 1$ 2ի# . 
-  ./$(
/ .*)'4ծ/# 

/0
'/$( 2$''1
-4

. *)
*(+' 3$/4*!
/# .$/ " *'*"4
)+-*%
/.
),0
'$/4֨
*(+' / ) ..*!/# 
*).0'/
)/.շ- +*-/.
)2$''*)'4

$'' 
!*-

/0
'#*0-.2*-& ի''+'
)
#
&.2$''
/0-) 
-*0)2$/#$)/# 
"- 0+*)/$( !-
( .*-
.
) "*/$
/ !*- .+
$
''4'
-" *-
*(+' 3+-*%
/.ի
/
!! ./$(
/  *0-. 1
$'

$'$/4
%
)#
)-
լլ Թ #*0-.+ -!0''+'
)
#
& ԹԵ࡜

!! 0''լլ Թ #*0-.+ -!0''+'
)
#
& ԹԺ࡜
#-$./$
) '"
$''*լլ 

&0+ ԹԺ࡜
-$
 *''$
4լլ 

&0+ ԹԺ࡜
Resumes
 #
1 +-*1$  /
$' - .0( .!*-
''+-*+*. ./
!!$)/# ++ )$3*!*0-+-*+*.
'ի

6. Related Experience
 '*22 #
1 +-*1$ 
! 2 3
(+' .*!*0- (*)./-
/ 

+

$'$/4/*+-*1$ /# - ,0 ./ . -1$
.ի
Third Party Reviewer for Emergency
Repair of Cyprus Shore Landslide
San Clemente, CA
 -
)/
.+-*1$  " */
#)$

'- 1$ 2!*-/# 
ࡂԶԸիԼ ( -" )
42*-&/*./

$'$5 /#  /-*'$)&
-
$'-*
/-

&.
/4+-0.#*- $)
)' ( )/ լ
2# - 
)
)
$ )/'
).'$ -

/$1
/ 
)/#-
/ ) 
/# /-

&.ի 1$ 2 .'*+ ./

$'$/4
)
'4. .
+ -!*-( 
4/#  .$")և
0$'
*)/-

/*-շ.

*).0'/
)/լ- +
$-+'
).լ.+
$!$

/$*).լ
)
$)./-0( )/
/$*)
/
ի# - +
$-$)
'0 $)./
''
/$*)
*!ԷԷԵ"-*0)
)
#*-.լ

#ԶԸԸ! /'*)"լ$)/*/# 

-*
&լ/2*-*2.*!ԶԶԵ"-


(.լ
)

++-*3$(
/ '4ԶլԵԵԵ
0 $
4
-.*!.#*/
- / /*
+-*/
//# -
$'-*
/-

&.ի
Client Name
-
)" *0)/4-
).+*- /
/$*)0/#*-$/4֢֣
Contact

.*)
լ-*%
/
)
" -լ
$'-*"-
(.

ԼԶԹիԺԻԵիԺԽԸԸ ֩%' ד
*/
ի) /֩ԶԺԺԵի
$)/իլ-
)" լ
ԾԷԽԻԽ
Dates
ԷԵԷԷև ԷԵԷԹ
Proposed Staff Involved
%
)#
)-
լ -$)
$+
'և$)#
-" 
)'
) 1$ 2 -֩
!!
0''լ'
) 1$ 2 -
9658
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services On-Call Geotechnical Plan Review
Anaheim, CA
 -
)/
. #
.#
/# +'
.0- *!. -1$)"/# $/4*!
)
# $(
*)/$)0*0.'4 .$)
ԷԵԵԺլ+-*1$$)"
)1$-*)( )/
'լ" */
#)$

'լ
)(
/ -$
'./ ./$)"

)$).+
/$*). -1$
.!*-/-
).+*-/
/$*)լ
1 '*+( )/լ$)./$/0/$*)
'լ$)!-
./-0
/0- լ 0

/$*)լ

)2
/ -+-*%
/.ի
 -
)/
.#
.
'.*+ -!*-( /#$-և+
-/4+ -- 1$ 2
*!" */
#)$

'$)1 ./$"
/$*)- +*-/.!*-/# $/4*!
)
# $(ի
)/# '
./!$1 4
-.լ2 #
1 +-*1$ +'
)

#
&- 1$ 2!*-*1 -ԹԵ+-*%
/.լ-
)"$)"!-*(/*
.$)"' և!
($'4#*( .լ
!!*-

' #*0.$)"լ2
- #*0. .լ
+-$1
/ .
#**'.լ
)
*(( -
$
'
)$)0./-$
'
1 '*+( )/.ի
On-Call Geotechnical Plan Review
Diamond Bar, CA
 -
)/
. #
.
*)/$)0*0.'4. -1 
." */
#)$

'

*).0'/
)/!*-/# $/4*!$
(*)
-!*-ԸԹ 4
-.ի
*)/-

/. -1$
.$)
'0 /#$-և+
-/4- 1$ 2*!
" */
#)$

'֢.*$'.
)" *'*"4֣- +*-/.!*-
1 '*+( )/.+'
)) 2$/#$)/# $/4լ+'0.
" */
#)$

'(*)$/*-$)"0-$)"
*)./-0
/$*)*!'
-" 
1 '*+( )/+-*%
/.ի -
)/
. #
.+-*1$ - 1$ 2
!*-)
-'4ԷԹԵ+-*%
/.֢(*./2$/#(0'/$+' .0
($//
'.֣
$)/# $/4-
)"$)"!-*(.'*+ - +
$-./*'
-" /-

/
- .$ )/$
' 1 '*+( )/ի
 -
)/
.
'.*+-*1$ ." */
#)$

'. -1$
.$)
.0++*-/*!$
(*)
-շ.+0
'$
2*-&.+-*%
/.լ$)
'0$)"" */
#)$

'
*).0'/$)"
)*
. -1
/$*)
)
/ ./$)"!*-+
-&$(+-*1 ( )/.լ./- /$(+-*1 ( )/.
).'*+ - +
$-.ի
Client Name
$/4*!)
# $(
Contact
#
2)5
-#**.#լ-$)
$+
'$1$')"$) -
ԼԶԹիԼԻԺիԺԵԺԹ ֩5
-#**.#ד
(
# $)ի) / ֩
ԷԵԶ)
# $('1יԶԵԼլ)
# $(լԾԷԽԵԺ
Dates
ԷԵԶԼև )"*$)"
Proposed Staff Involved
%
)#
)-
լ-$)
$+
'և$)#
-" 
)'
) 1$ 2 -
Client Name
$/4*!$
(*)
-
Contact

1$
$0լ$-
/*-*!0
'$
*-&.

ԾԵԾևԽԸԾևԼԵԹԶ ֩'$0ד$

(*)
-ի

ի"*1 ֩
ԷԶԽԷԺ*+' 4-$1 լ$
(*)
-լԾԶԼԻԺ
Dates
ԶԾԾԶև )"*$)"
Proposed Staff Involved
%
)#
)-
լ-$)
$+
'և$)#
-" 
)'
) 1$ 2 -
10659
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services On-Call Geotechnical Plan Review
Metro Gold Line Foothill Extension, CA
 -
)/
. 1
'0
/ /# +*/ )/$
'" */
#)$

'
$(+

/.
)#
5 -.!*-/# +'
)) ԷԹև($' 
3/ ).$*)*!/# *'
$) '$"#/-
$'/-
).$/ի*0-

'/ -)
/$1 .!*-/# +-*+*. 
'$")( )/լ$)
'0$)"/# 

$"#/
$'-
).$/֢
֣*)/-$+' /-

&.
)
*)
*0
' /-

&.լ2 -  1
'0
/ 
*/#!-*(/# 
+ -.+
/$1 .*!
*)./-0
/$*)և+ -$*$(+

/.
)'*)"և
/ -($(+

/.ի -
)/
. .0
. ,0 )/'4+ -!*-( !$ '
3+'*-
/*-4
*-$)".լ'

*-
/*-4/ ./$)"
)
" */
#)$

'
)
'4. .!*-/# +- '$($)
-4 )"$) -$)"
+#
. !*-ԶԻ$!! - )/
-$" .ծ
)" */
#)$

'
./0$ .
//# +-*+*. (
$)/ )
)
!

$'$/4լ
%

)/
/*
ԷԺԵև!**/ +"-
1 '+$/լ
)
//#- +-*+*. 
+
-&$)"./-0
/0- .
'*)"/# 
'$")( )/ի.2$/#(*./*!*0/# -)
'$!*-)$
լ!
0'/$)"
). $.($
$/42 - 

'.*
- .. !*-/#$.+-*%
/ի
 -
)/
. #
.
)+
-/*!/# *'
$) **/#$''3/ ).$*)+-*%
/.$)
ԷԵԵԺի) -/#$.
0-- )/

*)/-

/֨+#
. լ -
)/
. #
.
)+-*1$$)" )"$) -$)".0++*-/0-$)"/#  .$")֨
0$'+#
. .*!/# 
+-*%
/ի +-*1$ /
#)$

'- 1$ 2*!" */
#)$

'- +*-/.!*-"-
. +
-
/$*).լ- /
$)$)"2
''.լ
.*0)2
''.լ./*-(2
/ -$)!$'/-
/$*) !

$'$/$ .լ+
-&$)"'*/.
)./-0
/0- .լ-
$'-*
.լ
)-
$)
" 
0'1 -/.ի
 +-*1$ *0- 3+ -/$. $)- .*'1$)"/
#)$

'$..0 .
).
# 0' 2$/#/# ./
& #*' -./#
/$)
'0 

'/-
).լ /-*լլ
)'*

'
$/$ .ի

7. Sample Plan Review Correction Lists & Forms

)/# ++ )$3*!/#$.*
0( )/լ2 #
1 +-*1$ 
(+' '
) 1$ 2#
&'$./.!*-(0)$
$+
'
'$ )/.
*)- .$ )/$
'լ
*(( -
$
'
)'
).'$ +-*%
/.ի + )$)"*)+- ! - )
*!/# 
" )
$ .լ2 #
1 0. 
1 -$*0.!*-(
/.
)+'
/!*-(.լ-
)"$)"!-*(

#
&'$.//#
//# 
*).0'/
)/.

)0. /*+-*1$ /# $-
- .+*). $)/# !*-(*!
)*!!$
$
'- .+*). ' // -/*
)3
'/

' 2# - /# 
*).0'/
)/.

).$(+'4
+-*1$ /# $-- .+*). /*

#- 1$ 2
*(( )/ի 
- 
'.*!
($'$
-2$/# '
/-*)$
+'
/!*-(.!*-+'
)

#
&- 1$ 2լ.0
#
.'0

(
)և'
)  1$ 2֢֣ի 2$''2*-&2$/#/# $/4/*

*((*
/ 
/# $-+- ! - )
2$/#/# 
*).$ -
/$*)*!./-
('$)$)"/# - 1$ 2+-*
..ի

8. Project Schedule
 -
)/
.
*(($/./*+-*1$$)"+'
)- 1$ 2.2$/#$)/# $/4շ.+-*1$ /0-)
-*0)/$( .֢*-!
./ -
.
+*..$
' հ֣ի''!$-./
#
&. 2$''

*(+' / 2$/#$)/2 '1 ֢ԶԷ֣2*-&$)"

4.
)
''.
*)
)
.0
. ,0 )/- և
#
&.2$''

*(+' / 2$/#$). 1 )֢Լ֣2*-&$)"

4.ի*- ( -" )
4+-*%
/./#
/
- ,0$- ,0$
&/0-)
-*0)/$( լ.0
#
..'*+ ֨'
).'$ - +
$-.լ -*.$*)
*)/-*'+-$*-/*
(
%*--
$)./*-(լ

)
-/#2*-&/*(
)
" !'**$)"լ2 #
1 
 +
)
#*!/
#)$

'./
!!/#
/

)+-*1$ 
/$( '4
- 1$ 2ի
Client Name
 / -**'
$) **/#$''*)./ -0
/$*)0/#*-$/4
Contact
 )$.*0-)*4 -լ$-
/*-*!)"$) -$)"
ԻԷԻիԸԵԺիԼԵԵԼ ֩*0-)*4 -ד**!/#$''*"''$ (ի*-"֩
ԹԵԻ 0)/$)"/*)-$1 լ*)-*1$
լԾԶԵԶԻ
Dates
ԷԵԵԺև )"*$)"
Proposed Staff Involved
%
)#
)-
լ-$)
$+
'և$)#
-" 
)'
) 1$ 2 -
11660
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services

9. Cost Data
.$-
/ $)/# լ2 #
1 +-*1$ *0-
*./$)!*-(
/$*)
.
. +
-
/ *
0( )/ի

10. Statement of Compliance
#$.+-*+*.
'$.$)./-$
/
*(+'$
)
2$/#/#  ,0 ./!*--*+*.
'
)-
!/"- ( )/
))* 3
+/$*).
/* $/# -
- +-*+*. ի

11. Other Information
 -
)/
.
)
ի ֢!*-( -'4
$"#/*)֣$.
) )1$-*)( )/
''4!*

0.  )"$) -$)"
).
$ )

*(+
)4
$

/ /*.0++*-/$)"
.0./
$)

' !0/0- ի
)
$/$*)/* )1$-*)( )/
'
) )"$) -$)". -1$
.լ2 
)*2+-*1$ $))*1
/$1 *!! -$)".$)/# !$ '.*!!'*2'

.
$ )

)$)/ "-
/ /
#)*'*"4ի
Why Verdantas?
•  + -
)
#*!3 + -/.
-*../# *0)/ -4 խ -
)/
.#
.
'
-" +**'*!)1$-*)( )/
'
)
 */
#)$

'+-*! ..$*)
'.

-*../# 
*0)/-4լ"$1$)"0.

../* 3+ -/.
)
2
'/#*!&)*2' " /#
/
2 

)/
+$)/*/*+-*1$ !- .#$
.
)$))*1
/$1 .*'0/$*).ի 
'.*#
1 
)$(+- ..$1 +*-/!*'$**!
3+ -/$. $) 4-*'*"4լ 4-
0'$
.ʪ'0$.լ0./
$)

$'$/41$.*-4լ
/0-
' .*0-
.ʪ)1$-*)( )/
'
'
))$)"լ
).*(0
#(*- հ
• 
#)*'*"$

'1
)
( )/խ #  -
)/
.
)/ "-
/ 
#)*'*"4/
(' 1 -
" .
1 )
Ը
)
" *.+
/$
'/
#)*'*"$ ./*/

&'  )"$) -$)"
#
'' )" .#
*)ի#$.

)# '+/-
).!*-(#*22 

..լ
)
'45 լ
)(
)
" 4*0-
/

)
.. /.լ
*''
/$)"-
'և/$( 
)+-
$. 
/
լ+*2 -$)"4*0-

$.$*)և(
&$)".*'0/$*).ի
0-'*

'/
(#
.2*-& $'$" )/'4/* ).0- +-*%
/.- (
$)*)/-

&
)/#
//# ,0
'$/4*!. -1$
4*0
#
1 
*( /* 3+
/!-*(/# !*-( -
$"#/*)$.0)2
1 -$)"ի# /
(4*0
- 2*-&$)"2$/#)*2$./# 
/
(4*02$''
2*-&$)"2$/#/*(*--*2ի 
)/$
$+
/ /#
/*0-
$/$*)
'

../*/# . - .*0-
.2$''
*)'4$(+-*1 *0-

$'$/4/*
./. -1 4*0լ*0-
'$ )/.ի

12. Non-Discrimination
 -
)/
.
)
ի
"- ./#
/$)

--4$)"*0/$/.- .+*).$
$'$/$ .0) -/#$.
"- ( )/լ
)$)+
-/$
0'
-2$/#
- "
-/*/#  (+'*4( )/*!+ -.*).
).0
և
*)/-

/*-.2*-&$)"*)/# +-*%
/լ2 2$'')*/$.
-$($)
/ 
*)/# 

.$.*!-

լ
*'*-լ
- լ)
/$*)
'*-$"$)լ- '$"$*)լ. 3լ
" լ*-#
)$

+ի
)/#  1 )/
)4*!/# 
2*-&+ -!*-( 
4*0-/
( # - 0) -$..0
և
*)/-

/ /*
)*/# -+ -.*)*-!$-(֢2$/#
++-*1
'*!/# 
$/4
.- ,0$- # - $)֣լ/# .0
և
*)/-

/.#
''
*)/
$)
.$($'
-+-*1$.$*)ի
12661
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services APPENDIX 1
Resumes
13662
Firm
 -
)/
.
)
ի
Office Location

-1$) լ
Education
լ$1$')"$) -$)"լ 3
.ʪ
)$1 -.$/4
լ$1$')"$) -$)"լ#0)"
0
)#-$./$
))$1 -.$/4
Licenses/Certifications
և  */
#)$

')"$) -և
ԷԸԼԻ
և $1$')"$) -ֈ ԺԵԵԻԽ
ԹԵև *0-
'և 
'/#
)

! /4-
$)$)"
Years of Experience
ԸԻ 
-.*!
)0./-43+ -$ )

ԸԻ 
-.
/ -
)/
.

Djan Chandra, PE, GE
Principal In Charge
Verdantas.com
-ի#
)-

-$)".ԸԻ 4
-.*! 3+ -$ )
$)" */
#)$

'. -1$
.!-*(/# 

-'4+'
))$)"լ.$/ $)1 ./$"
/$*)լ'

*-
/*-4/ ./$)"լ
/

)
'4.$.լ- +*-/
+- +
-
/$*)/#-*0"#"-
$)"
)
*)./-0
/$*)*!1
-$*0./4+ .*!
$1$'
!

$'$/$ .լ$)
'0$)"- .$ )/$
'
)
*(( -
$
' 1 '*+( )/.լ
/-
).+*-/
/$*)լ"*1 -)( )/
'
)0/$'$/4+-*%
/.ի0-$)"/#$./$( լ# #
.
(
)
" 
2$ -
)" *!+-*%
/.$)
'0$)"'
-" և.

'  .$")և
0$'
+-*%
/.լ2$/#1
-4$)"" *'*"$

*)$/$*).
)
*)./-
$)/.լ
)#
.+-*1 )
.&$''.$).
# 0'$)"լ
0" /$)"լ
)(
)
"$)"
*(+' 3+-*%
/.ի-ի
#
)-
շ.
-
.*! 3+ -/$. $)
'0 !*0)
/$*) .$")լ.*$'- $)!*-
( )/լ
.'*+ ./

$'$/4
)
'4.$.լ!$)$/  ' ( )/
)
'4.$.լ
)
*(+0/ -
++'$

/$*).
$)" */
#)$

' )"$) -$)"ի $. 3/ ).$1  3+ -$ )
$) .$")
)

++'$

/$*)*!" *.4)/# /$
.- $)!*-
( )/.$)" */
#)$

' )"$) -$)"լ
$)
'0$)"*1 -./ + ) .'*+ .լ+
1 ( )/.0
"-
./

$'$5
/$*)լ
)
. "( )/
'- /
$)$)"2
''.#
.+-*1 )
)
.. /*)
1
-$ /4*!+-*%
/.ի $.
!
($'$
-2$/#1
-$*0.!$ '(*)$/*-$)" ,0$+( )/լ.0
#
.$)
'$)*( / -!*-
.'*+ (*)$/*-$)"լ(
)*( / -' 1 '.0-1 4լ
). //' ( )/+'
/ ի
Project Experience
Cyprus Shore Stabilization for OCTA | 
)' ( )/ լ
 */
#)$

' 1$ 2 -!*-/# ࡂԶԸիԼ ( -" )
42*-&/*./

$'$5 /# 
 /-*'$)&-
$'-*
/-

&.
/4+-0.#*- $)
)' ( )/ լ2# - 
)

)
$ )/'
).'$ -

/$1
/ 
)/#-
/ ) /# /-

&.ի 1$ 2 .'*+ 
./

$'$/4
)
'4. .+ -!*-( 
4/#  .$")և
0$'
*)/-

/*-շ.
*).0'/
)/լ
- +
$-+'
).լ.+
$!$

/$*).լ
)$)./-0( )/
/$*)
/
ի# - +
$-$)
'0 
$)./
''
/$*)*!ԷԷԵ"-*0)
)
#*-.լ

#ԶԸԸ! /'*)"լ$)/*/# 
-*
&լ
/2*-*2.*!ԶԶԵ"-


(.լ
)
++-*3$(
/ '4ԶլԵԵԵ
0 $
4
-.*!
.#*/
- / /*+-*/
//# -
$'-*
/-

&.ի
Anaheim On-Call Engineering and Peer Review | )
# $(լ
-*%
/
)
" -!*-/# /#$-և+
-/4+ -- 1$ 2*!" */
#)$

'
$)1 ./$"
/$*)
)$)!$'/-
/$*)- +*-/.!*-*1 -ԹԵ+-*%
/./#
/-
)" !-*(
/*.$)"' և!
($'4#*0. .լ
!!*-

' #*0.$)"լ+-$1
/ .
#**'.լ
)
$)0./-$
'
)
*(( -
$
' 1 '*+( )/.ի
LA Metro, Gold Line Foothill Extension |
*.)" ' .լ
 */
#)$

' 1$ 2 -!*-/#  .$")և
0$'*!/# ԶԶիԺև($'  3/ ).$*)*!/# 
*'
$) '$"#/-
$'/-
).$/!-*(
.
)
/*50.

)/# *)"*$)"ԶԷիԸև
14663
DJAN CHANDRA, PE, GE RESUME CONT.

Verdantas.com
($'  3/ ).$*)!-*(50.
/**)/
'
$-ի 1$ 2 *0)
/$*) +*-/.+- +
- 
4
*)/-

/*-!*-) 2
-$" .
)
2$ )$)"*! 3$./$)"
-$" .
'*)"/# 
'$")( )/ծ */
#)$

' .$") +*-/.!*-- /
$)$)"2
''.լ.*0)2
''.լ
)
./
/$*).ծ" */
#)$

'$)1 ./$"
/$*)- +*-/.!*-+
-&$)"./-0
/0- .֢
. +
-
/  .$")և
0$'
*)/-

/֣ծ2
'' .$")

)+'
).ծ
).+
$!$

/$*).!*-
-/#2*-&լ"-*0)
)
#*-$)./
''
/$*)լ
 +$' $)./
''
/$*)լ
)2
''

*)./-0
/$*)ի**-$)
/ 2$/#/# 0/#*-$/4
)
*)/-

/*-.*)- .*'0/$*)*!- 1$ 2
*(( )/.ի
City of Diamond Bar, On-Call Plan Check Review Services | $ (*)
-լ
 */
#)$

'- 1$ 2 -!*-1
-$*0.+-*%
/.$)/# 
$/4*!$
(*)
-
.+
-/*!
)*)"*$)"
))0
'
*)/-

/2$/#/# 
$/4*!$
(*)
- /#
/$)
'0  - .$ )/$
'
)
*(( -
$
' 1 '*+( )/.2$/#
#
'' )"$)"" *'*"$

*)$/$*).լ
.0
#
.'
).'$ .լ.*$')
$'$)"լ
)'$,0 !

/$*)ի
Ocean Boulevard Erosion and Enhancement Project |
*)"

#լ
 */
#)$

'


/
(*!/#- " */
#)$

'!$-(./*+ -!*-(/
#)$

'- 1$ 2*!/# 

)*0' 1
--*.$*)
)
)#
)
( )/-*%
/ !*-/# $/4*!
*)"

#ի- . )/ 
*(( )/.
)
*)
'0.$*).
/$/4*0)
$'
)+0
'$

( /$)".ի
City of Costa Mesa, Costa Mesa Motor Inn Property Redevelopment | *./  .
լ
 */
#)$

'- 1$ 2 -!*-/# $/4*!*./
 .
!*-/# +-*+*. (0'/$և!
($'4- .$ )/$
' 1 '*+( )/
/ԷԷԼԼ

-
*-*0' 1
-ի
City of Monterey Park, Residential Development Peer Review | *)/ - 4 -&լ
 */
#)$

'- 1$ 2 -!*-/# $/4*!*)/ - 4
-&!*-
*/.Է
)Ըլ )/
/$1 
-
'ԷԺԼԶԺի
City of Hesperia, Assisted Living Facility and Skilled Living Facility | .+ -$ լ
 */
#)$

'- 1$ 2 -!*-/# $/4*! .+ -$
!*-/# +-*+*. ..$./ 
$1$)"

$'$/4
)&$'' 
$1$)"

$'$/4լ
*- (*./
'/# -1$
.
/ԶԼԺԽԶ0'/
)
/- /ի
Riverside County Flood Control and Water Conservation District | $1 -.$ *0)/4լ  */
#)$

'- 1$ 2 -!*-/# +-*+*. ./*-(-
$).!*-) 2- .$ )/$
'/-

/.$)1
-$*0.(
./ -և+'
)) 
1 '*+( )/.$)$1 -.$ *0)/4լ$)
'0$)"
$/$ .+!

& '.$)*- լ
0-0+

'' 4լ )$! լ
)$'*(
-ի
City of Santa Ana On-Call Contract | 
)/
)
լ
-*%
/ */
#)$

')"$) -!*-1
-$*0.

+$/
'$(+-*1 ( )/+-*%
/.լ$)
'0$)"-$./*'/- /$ )$)"#
. 

)
#
. 

լ
)./- /$(+-*1 ( )/.
/
-) -
)0./-$
' )/ -ի
Long Beach Water Department On-Call Contract |
*)"

#լ
-*%
/ */
#)$

')"$) -!*-*)և

''+-*%
/.լ$)
'0$)"$(+-*1 ( )/.
/Թ/# /- /
)*' )1 )0 լԽ/# /- /

)
*(
1 )0 լ
)$''*2/- /
)-$
/$
1 )0 ի -1$
.+-*1$ $)
'0 
*(+

/$*)/ ./$)"*!/- )
#

&!$''լ+
1 ( )/.0
"-
լ
""- "
/ 

. լ
)
.+#
'/
*)
- / լ
)
*)
- / .
(+'$)"
)/ ./$)"ի-*1$ 
.0+ -1$.$*)*!/# / ./$)". -1$
.
)
**-$)
/$*)2$/#/# 
*)./-0
/$*)(
)
" -
)
*)/-

/*-ի
15664
Firm
 -
)/
.
)
ի
Education
լ *'*"4լ
)$ "*/
/ 
)$1 -.$/4
Licenses/Certifications
ֈ  -/$!$ )"$) -$)"
 *'*"$./ֈ ԷԵԺԻ
ֈ -*! ..$*)
' *'*"$./և
ԻԸԻԹ
ԶԾԶԵիԶԷԵ ԹԵև *0-
-
$)$)"
ԶԾԶԵիԶԷԵ Խև *0-
 !- .# --
$)$)"
0
'
-
0"  -/$!$

/$*)
.+#
'/
1 ( )/ԶԵԶ
Years of Experience
ԷԼ 
-.*!
)0./-43+ -$ )

Ի 
-.
/ -
)/
.

Jeff Hull, PG, CEG
Associate Geologist
Verdantas.com
-ի 0''#
.
*(+$' 
)
-'4ԹԵև4
-#$./*-4*!+-*! ..$*)
' )"$) -$)"
" *'*"$./+-

/$
$).*0/# -)
'$!*-)$
ի $. 3+ -$ )
#
.$)
'0 
!*- ).$
լ )1$-*)( )/
'լ($)$)"լ+
' *. $.(*'*"$
լ#4-*" *'*"$

'լ
)
+
' *)/*'*"$

'$)1 ./$"
/$*).!*- 1 '*+( )/*!- .$ )/$
'֨
*(( -
$
'֨
- /
$'+-*%
/.ի #
.+
-/$
$+
/ *). 1 -
'/
(.
..$") /*.*'1 
1 -$*0.
*(+' 3" *'*"$
$..0 .!*-(
)4#$"#և+-*!$' 
'$ )/ ' ի $.+-*%
/
3+ -$ )
$)
'0 .
*(+' /$*)*!" *'*"$
#
5 -
)
'4. .լ
*
./
'
'0ʯ
./0$ .լ$)1 ./$"
/$*)*!

/$1 '
).'$ .
)!
0'/.լ
)*
. -1
/$*).
)
(
++$)"!*-- ( $
'"-
$)"
*)!*-(
)
!*-.(
''/*'
-" .

' 
1 '*+( )/.
)/# 
*)./-0
/$*)*!-*
2 4.֨2
''.֨
-$" .֨.'*+ .ի
/# -#
5 -
)
'4. .2*-&- '
/ ./*-*
&!
''լ
-$.!'*2լ/.0)
($լ
)
'$,0 !

/$*)#
5 -.ի
Project Experience
Cyprus Shore Stabilization for OCTA | 
)' ( )/ լ
 */
#)$

' 1$ 2 -!*-/# ࡂԶԸիԼ ( -" )
42*-&/*./

$'$5 /# 
 /-*'$)&-
$'-*
/-

&.
/4+-0.#*- $)
)' ( )/ լ2# - 
)

)
$ )/'
).'$ -

/$1
/ 
)/#-
/ ) /# /-

&.ի 1$ 2 .'*+ 
./

$'$/4
)
'4. .+ -!*-( 
4/#  .$")և
0$'
*)/-

/*-շ.
*).0'/
)/լ
- +
$-+'
).լ.+
$!$

/$*).լ
)$)./-0( )/
/$*)
/
ի# - +
$-$)
'0 
$)./
''
/$*)*!ԷԷԵ"-*0)
)
#*-.լ

#ԶԸԸ! /'*)"լ$)/*/# 
-*
&լ
/2*-*2.*!ԶԶԵ"-


(.լ
)
++-*3$(
/ '4ԶլԵԵԵ
0 $
4
-.*!
.#*/
- / /*+-*/
//# -
$'-*
/-

&.ի
7-Mile OCTA Rail Corridor Coastal Bluff Study ֩
)' ( )/ լ

)"$) -$)" *'*"$.//
.& 2$/#+- +
-
/$*)*!
)$)$/$
'-$.&

.. ..( )/*!
*
./
'
'0!!./

$'$/4
)$(+

/./* 3$./$)"-
$''$) ի
 -!*-( #$./*-$

'
-$
'+#*/*"-
+#- 1$ 2լ" *'*"$
!$ '(
++$)"լ-$.&
' 1 '
..$")( )/
)- +*-/$)"$)
'0$)"!*-

./*!
'0!!./

$'$/4!*-!0/0-
ԸԵև4
-.ի
Calle Vallarta Landslide Stabilization | 
)' ( )/ լ
 -!*-( " *'*"$
(
++$)"լ 3+'*-
/$*)լ
)*
. -1
/$*)֨*
0( )/
/$*)
0-$)".#
-+$' $)./
''
/$*)/*+-*/
/ 3$./$)"$(+-*1 ( )/.!-*( ʯ
/.
*!'
/ -
'($"-
/$*)*!

/$1 '
).'$ ի
Bluff Erosion Study, Calafia Beach | 
)' ( )/ լ

)
" ./04*!#$./*-$

' -*.$*)
*)$/$*).
)
'0ʯ./

$'$/4$(+

/$)"
 /-*'$)&-
$''$) լ
'*)"࡟)$ './- /
#!*
*
./'
.
'
$ʯ..*0/#*!
'
!$

16665
JEFF HULL, PG, CEG RESUME CONT.

Verdantas.com


#ի*)0
/ #$./*-$

'
-$
'+#*/*"-
+#- 1$ 2լ" *'*"$
!$ '(
++$)"լ.0
.0-!

-$''$)"
)- +*-/
+- +
-
/$*)2$/#-
*(( )
/$*).ի
Bluebird Canyon Landslide Investigation/Repair |

"0)


#լ

!$ '" *'*"$./!*-Ըև4
-ԷԵԵԺ

/
./-*+#$
'
).'$ $)1 ./$"
/$*)֨- +
$-$)
'0$)".0
.0-!

$)1 ./$"
/$*)լ
-$''$)"լ(*)$/*-$)"լ$)./
''
/$*)*!*
0( )/
/$*)*!./

$'$5
/$*)֨- +
$- ' ( )/.
)- ( $
'"-
$)"
*
. -1
/$*).ի
White Point Landslide | 
) -*լ
$ ' *'*"$./- .+*).$
' !*-
/

*''
/$*)
)
)
'4.$.*!" *'*"$
֨" */
#)$

' 1
'0
/$*)
)(*)$/*-$)"*!
#$./*-$
.$)"' և!
($'4- .$ )
0 
./*!/# #$/ .շ*$)/

).'$ լ )$).0'
ի -!*-( " *'*"$
(
++$)"լ
-$''$)"լ.
(+'$)"լ" *+#4.$

''*""$)"լԸ-+
-/4- 1$ 2*!
*)/$)0*0.
*-$)"լ
-*...
/$*)+- +
-
/$*)լ/$'/և( / -
(
.0- ( )/.լ"-*0)2
/ -
)
'4. .լ
*).0'/
/$*)լ
)- +*-/+- +
-
/$*)ի# +0-+*. 2
./* ./

'$.#
+ -(
) )/(*)$/*-$)"*!(*1 ( )/2$/#$)/# 
'$ )/.շ+-*+ -/4լ$)$-
/$*)/*2
-0).0++*-/ '
/ -
''
).'$ 
(
-"$)ի./

'$.# - (*/ .4./ (/*
' -/*!$)
-
. +*/ )/$
'!0/0- (*1 ( )/!*- 1

0 /$*)- .+*). ի
Talega Residential Development | 
)' ( )/ լ

!$ '" *'*"$./!*-ԺլԵԵԵև0)$/
' "
- .$ )/$
'
*((0)$/4$)
'0$)"
-$" .լ0) -"-*0)լ"*'!
*0-. 
)
$)!-
./-0
/0- ի1
'0
/ լ(
++ լ
)
.. .. 

/$1$/4
'*)"(
%*-- և0
/ -)
-4#-$./$
)$/*.
0'/*) ի
 -!*-( $)և"-
$)"" *'*"$
(
++$)"
)$).+
/$*).!*-'
-" 
0/֨!$''.'*+ լ
0//- ..լ
)-*
2 4և
-$" .

*)./-0
/$*)ի
Segunda Deshecha Canada HDPE Storm Drain Pipeline | 
)' ( )/ լ
..*
$
/  *'*"$./!*-/# + -!*-( "-
$)"*
. -1
/$*)
).*$'
*(+

/$*)/ ./$)"0-$)"$)./
''
/$*)*!
ԹլԺԵԵև
!**/ $"# ).$/4*'4 /#4' ) ./*-(-
$)֢ԶԶև!**/$
ի֣
'*)" "0)
 .#
#

)

-
$)
" 
3$.ի
Hampton Inn & Suites | $..$*)$ %*լ
..*
$
/  *'*"$./2#*(
)
" 0+
/ - +*-/+- +
-
/$*)լ!$ '$)1 ./$"
/$*).
)- ( $
'"-
$)"
)

*)./-0
/$*)!*-Ըև./*-4#*/ '.0++*-/ *)

*)1 )/$*)
'- $)!*-
.+-
և!**/$)".4./ (

-$)"*)) 2'4
)"$) - !$''2$/#

*(+
)4$)".*$')
$'2
''լ0/$'$/$ .լ
)'
).

+$)"$(+-*1 ( )/.ի
17666
Firm
 -
)/
.
)
ի
Office Location

-1$) լ
Education
լ$1$')"$) -$)"լ
'$!*-)$

/
/ *'4/
#)$
)$1 -.$/4լ
*(*)

լ$1$')"$) -$)"լ
'$!*-)$

/
/ *'4/
#)$
)$1 -.$/4լ
*(*)

Licenses/Certifications
ֈ -*! ..$*)
')"$) -և
יԽԸԸԸԶ
ֈ  */
#)$

')"$) -և
יԸԶԹԹ
Years of Experience
ԶԹ 
-.*!
)0./-43+ -$ )

ԶԶ 
-.
/ -
)/
.

Christian Delgadillo, PE, GE
Associate Engineer
Verdantas.com
#-$./$
)#
. 3+ -$ )
$)" */
#)$

' )"$) -$)"լ
*)./-0
/$*)
*
. -1
/$*)լ/ ./$)"լ
/

)
'4. .լ
)- +*-/+- +
-
/$*)!*-1
-$*0.
/4+ .*!+0
'$
2*-&.լ/-
).+*-/
/$*)լ"*1 -)( )/
'
)0/$'$/4+-*%
/.ի $.
- .+*).$
$'$/$ .$)
'0 (
)
"$)"լ
**-$)
/$)"
)
*)0
/$)".0
.0-!


$)1 ./$"
/$*).
) 1 '*+
-*...
/$*).
4'*""$)"
).
(+'$)"#*''*2և
./ (
0" -
*-$)".
)-*/
-42
.#
*-$)".լ
).0+ -1$.$)"
*) 
+ ) /-
/$*)/ ./$)"֢֣լ+- +
-
/$*)*!'

*-
/*-4
..$")( )/.լ
)
'45 

*(+0/ -(* './*+- $
/.'*+ ./

$'$/4!*-)
/0-
'
)(
)(

.'*+ .ի #
.
)$) +/#0) -./
)$)"*!
1 )
.*$'(
#
)$
.լ
.0
.0-!

$)/ -+- /
/$*)լ. $.($
#
5 -
)
'4. .լ.$/ .+
$!$
"-*0)
(*/$*)լ 3+
).$*)+*/ )/$
'լ'$,0 !

/$*) 1
'0
/$*)լ.'*+ ./

$'$/4լ
.#
''*2
) +!*0)
/$*).լ$).$/0/ ./$)"
)" */
#)$

'
$)./-0( )/
/$*)լ +
1 ( )/ .$")
)" */
#)$

' )"$) -$)"լ$).$/0
+ -(

$'$/4 / -($)
/$*)լ
)'

*-
/*-4
)
'4.$.*!.*$'.ի
Project Experience
As Needed Geotechnical, Special Inspection Services |  )/
)
լ
 )$*--*%
/)"$) -ի# +-*%
/
*).$./ *!+ -!*-($)"
$ -ևԶ
)
$ -ևԷ. $.($
./04+ -ԹԶևԶԼ
)/# ԷԵԶԾ
'$!*-)$
0$'$)"* 
!*-/# +-*+*. . $.($
0+"-
.*!/# -
)" *0)/4
''*!
($)$./-
/$*)
0$'$)"ի#-$./$
)շ.- .+*).$
$'$/$ .$)
'0 + -!*-($)"

.$/ և.+
$!$
"-*0)(*/$*)./04
)/$( #$./*-4
)
'4.$.լ 1
'0
/$*)*!
3$./$)"
)) 2!*0)
/$*).լ 1 '*+$)"" */
#)$

'-
*(( )
/$*).
!*- .$")
)
*)./-0
/$*)լ
)- +*-/+- +
-
/$*)ի
John Wayne Airport Maintenance Building | *./
 .
լ
 )$*-/
!!)"$) -ի-*1$ " */
#)$

' )"$) -$)".0++*-/0-$)"
"-
$)"
)
*)./-0
/$*)*!/# +-*%
/ծ
)+- +
- /# " */
#)$

'
- +*-/*!+-
$. "-
$)"
)
*)./-0
/$*)- +*-/*!/# (
$)/ )
)


0$'$)"լ+
-&$)"'*/լ
)
..*
$
/ $(+-*1 ( )/.ի# +-*%
/$)
'0 .

++-*3$(
/ '4ԶԹլԾԻԵ.ի!ի*!.#*+(
$)/ )
)
.+

$)/# $-+*-/
+ -
/$*).-
֢֣լ
)ԾլԾԷԷ.ի!ի*!
($)$./-
/$*)լ*!!$

)
-
$1$)"֨$.+
/
#.+

.*0/.$ *!/# ի
Orange County Central Jail Complex (CJX) | -
)" *0)/4լ
-*%
/)"$) -֨-*%
/
)
" -!*-" */
#)$

'
)(
/ -$
'./ ./$)"
. -1$
./*. 1 -
'+-*%
/.!*-/# -
)" *0)/4 )/-
'

$'*(+' 3
.
18667
CHRISTIAN DELGADILLO, PE, GE RESUME CONT.

Verdantas.com
+
-/*!
)*)և

''
*)/-

/ի-ի '"
$''*+-*1$ .*)"*$)"(
)
" ( )/*!.
# 0' /*( /$).+
/$*)
- ,0$- ( )/.լ )"$) -$)".0++*-/լ
)*
0( )/- 1$ 2$)
'0$)"!$ '- +*-/.
)+-*%
/+'
).ի
Beverly Hills High School |  1 -'4 $''.լ
-*%
/)"$) -!*-/# +-*1$ " */
#)$

' .$")- +*-/.!*-
''
.+
/.*!- )*1
/$*).
)) 2
*)./-0
/$*)
2#$
#$)
'0 .
/#- և' 1 '.0
/ --
)
)./-0
/0- 0) -
) 2!*0-և./*-4"4()
.$0(
0$'$)"ի)
'4.$.*!/# 
.0
.0-!


*)$/$*).$)
'0 *0-+- 1$*0.!
0'/./04
)
*-$)"..+
$!$
!*-/# +-*+*. 
*)./-0
/$*)ի0-
$)1 ./$"
/$*)
- .. ./-0
/0-
'$(+-*1 ( )/.լ) 2.#
-2
''./*$(+-*1 '
/ -
''*
- .$./
)
լ
).$/ և.+
$!$

. $.($
+
-
( / -.ի
2801 Kelvin Apartments |
-1$) լի
-*1$ /#$-+
-/4+'
)- 1$ 2!*-/# -  1 '*+( )/*! /#$. $)0./-$
'.$/ /*0+.

' 
+
-/( )/.ի*)./-0
/$*)*!
Ժև./*-42**և!-
( 
0$'$)"2$'' )
*(+
..

)/-
'+
-&$)"./-0
/0- 2$/#.$($'
-# $"#/ի# +
-&$)"./-0
/0- 
$)
'0 .
+
-/$
'

. ( )/' 1 'ի
I-5 / Avenida Pico Interchange | 
)' ( )/ լ
# 1 )$
$
*+-*%
/$.+
-/*!/# '
-" -
ևԺ*0/#*0)/4
(+-*1 ( )/.-*%
/ի#$..$")$!$

)/$)/ -
#
)" 
-
*)./-0
/$*)
'
) ./*1 )$
$
*լ-
*)./-0
/ /# 
-$" ./-0
/0- լ
)-
*)!$"0- *)և
)*!!և-
(+.ի
 -
)/
.+-*1$ ,0
'$/4
..0-
)
/ ./$)"*!.*$'.
)(
/ -$
'.ի
Gold Line Foothill Extension Phase 2B | ' )*-
/**)/
'
$-լ
-*%
/)"$) -!*-/# +- '$($)
-4!*0)
/$*)-
*(( )
/$*).
) 1
'0
/$*)*!/# +*/ )/$
'" */
#)$

'
$(+

/.
)#
5 -.!*-/# +'
)) ԶԷիԸև($'  3/ ).$*)*!/# *'
$) '$"#/-
$'/-
).$/ի**-$)
/ 
)
+ -!*-( !$ ' 3+'*-
/*-4
*-$)".լ
..$") '

*-
/*-4/ ./$)"
)+ -!*-( " */
#)$

'
)
'4. .!*-/# 
+- '$($)
-4 )"$) -$)"+#
. !*-ԶԻ$!! - )/
-$" .
)) 2
-/#- /
$)$)".4./ (.
/
ևԷԶԵ
)ևԺԼ!- 2

4.
/#
/2$''.0++*-//# )
..
-4
0/.!*-/# ) 2'$"#/-
$'/-

&.ի +*-/+- +
-
/$*)*!/# +- '$($)
-4!*0)
/$*)
- +*-/!*-
''/# 
-$" .
)
-/#- /
$)$)".4./ (.ի
19668
Firm
 -
)/
.
)
ի
Office Location

-1$) լ
Education
լ
-/#
$ )
լ
'$!*-)$

/
/ )$1 -.$/4լ
*)"

#
Licenses/Certifications
և  -/$!$ )"$) -$)"
 *'*"$./ֈ ԷԼԼԹ
ֈ  *'*"$./ֈ ԾԷԶԾ
ԶԾԶԵիԶԷԵ ԹԵև *0-
-
$)$)"
ԶԾԶԵիԶԷԵ Խև *0-
 !- .# --
$)$)"
$-./$-
$)$)"
Years of Experience
ԷԵ 
-.*!
)0./-43+ -$ )

ԶԵ 
-.
/ -
)/
.

Eric Holliday, PG, CEG
Associate Geologist
Verdantas.com
-$
#
.ԷԵ 4
-.*! 3/ ).$1  3+ -$ )
(
)
"$)"լ+'
))$)"
)

*)0
/$)"!$ '" */
#)$

'լ )1$-*)( )/
'
)" *'*"$
$)1 ./$"
/$*).
!*-1
-$*0.+-*%
/.$)
'0$)"լ.'*+ ./

$'$5
/$*)լ!
0'/$)1 ./$"
/$*).լ+$' .լ

$..*).լ
.+#
'/+
1$)"լ!**/$)".լ0/$'$/4

&!$''.լ-$'''*""$)"լ-*
&
*-$)"լ
/ .//- )
#$)"լ(*)$/*-$)"
)+0(+2 ''$)./
''
/$*).ի #
.+
-/$
$+
/ 
$)(
)4
.+
/.*!+-*%
/ 1 '*+( )/!-*(+-*%
/+'
))$)"լ
$)1 ./$"
/$*)լ
*)./-0
/$*). -1$
.լ
)+-*%
/(
)
" ( )/ի3+ -$ )

$)
'0 .+'
))$)"
)$-
/$)".0
.0-!

$)1 ./$"
/$*).լ
-/#
)-*
&
(
/ -$
'
#
-

/ -$5
/$*)լ.
(+'$)"
)'

*-
/*-4.*$'/ ./$)"լ$)/ -+- /$)"

)
)
'45$)"
/

)/ ./- .0'/.լ+ -!*-($)"" */
#)$

'
)
'4. .
+ -/
$)$)"/*!*0)
/$*)լ.'*+ ./

$'$/4լ. +
" լ"-*0)2
/ -լ
$)./-0( )/
/$*)
)
*)./-0
/$*)(*)$/*-$)"լ+- +
-$)"
*./ ./$(
/ .

)/
#)$

'- +*-/.ի
Project Experience
Proposed Broadstone Promenade |
*)"

#լ
 */
#)$

'-*%
/
)
" -!*-/# +-*+*.  1 '*+( )/
*).$./.*!
)
Խև./*-4(0'/$և!
($'4- .$ )/$
'
0$'$)".$//$)"
/*+
/#- և./*-4+
-&$)"
./-0
/0- 2$/#/2*.0
/ --
)
)' 1 '.ի */
#)$

' .$")
*).$ -
/$*).
!*-/# +-*%
/$)
'0 
 + 3

1 /$*)
%

)//* 3$./$)"./-0
/0- .լ

)- '
/$1 '4.#
''*2"-*0)2
/ -)
-/#  3

1 /$*)
*//*(ի
Orange County Civic Center - County Administration South Building 16 | 
)/
)
լ
-*%
/ *'*"$./ 1
'0
/ .0
.0-!


*)$/$*).լ+ -
*'
/$*)/ ./
)
'4.$.

)+-*1$ " *'*"$
-
*(( )
/$*).!*-.$/ "-
$)"
)!*0)
/$*)
.$")ի# ԸիԹև

-  1 '*+( )/
*).$./.*!/# 
*)./-0
/$*)*!
) 2Իև
./*-4*0)/4*!-
)" *!!$

0$'$)"0) -'
$)
4/2*' 1 '.*!
.0
/ --
)
)+
-&$)"2$/#
)
%

)/*)! - )
1 )/ )/ -'*

/ 
.*0/#*!/# (
$)*!!$

0$'$)"ի#$.$./# !$-./+#
. *!/# $1$
 )/ -


$'$/$ .
./ -'
)/*#*0. ԶԸ*0)/4
" )
$ .$)*) 
-
*!/# 
$/4ի
Beverly Hills High School Buildings B1 and B2 Modernization |  1 -'4 $''.լ
-*%
/ *'*"$./!*-" */
#)$

' .$")- +*-/.!*-
''
.+
/.*!
- )*1
/$*).
)) 2
*)./-0
/$*)2#$
#$)
'0 .
/#- և' 1 '
.0
/ --
)
)./-0
/0- 0) -
) 2!*0-և./*-4"4()
.$0(
0$'$)"ի
)
'4.$.*!/# .0
.0-!


*)$/$*).$)
'0 *0-+- 1$*0. !
0'/./04լ
)

*-$)"..+
$!$
!*-/# +-*+*. 
*)./-0
/$*)ի0-$)1 ./$"
/$*)
- .. 
20669
ERIC HOLLIDAY, PG, CEG RESUME CONT.

Verdantas.com
./-0
/0-
'$(+-*1 ( )/.լ) 2.#
-2
''./*$(+-*1 '
/ -
''*
- .$./
)
լ
).$/ և.+
$!$
. $.($
+
-
( / -.ի
# 
#
'' )" .*!
0$'$)"*)
)0-

).$/ 
- 
*(+*0) !*- 1 -'4 $''. $"#
#**'լ2$/#1
-4$)".*$'
*)$/$*).
- ,0$-$)"($/$"
/$*)/*(
& /# - )*1
/$*)(
./ -+'
)+*..$
' ի
Hoag Hospital Geotechnical Hazardous Report |  2+*- /

#լ
-*%
/ *'*"$./- .+*).$
' !*-/# " */
#)$

'
) *'*"$

5 -- +*-/!*-+'
)) 0+"-
./**-/#*2 -
- ,0$- 
4ԶԾԺԸլ/*/-0
/0-
' -!*-(
)

/ "*-4Թ֢ևԹ֣+ -/# ԷԵԶԻ
'$!*-)$
0$'$)"* ֢֣ի
Proposed Three Tower Hotel and Retail Complex | 
- )-*1 լ
 */
#)$

' 3+'*-
/$*)
) .$")' 1 '- +*-/!*-) 2#*/ 'և
*)! - )

*(+' 3ի .$")
*).$./.*!/#- (
$)
#*/ '/*2 -.!-*(ԶԺԽ/*ԷԹԵ! /$)# $"#/2$/#" ) -
'և0. +**'լ$)$)"/ --


).+
ծ
*)
- / - $)!*-
+
-&$)"
"
-
" 2$/#Լև' 1 '.*! +
-&$)"

*1 "-
2$/#-**!/*+
( )$/$ .
&
)*) .0
/ --
)
)' 1 '/#
/
*1 -.

(
%*-$/4*!/# +-*%
/.$/ ծ- /
$'֨- ./
0-
)/֨ )/ -/
$)( )/
0$'$)".ծ )/-4/0-)և
-*0)
)-*+*!!
-
.ծ

..
-*
.
)0/$'$/4$)!-
./-0
/0- ի
Los Angeles Premium Outlets (Former Cal-Compact Landfill) |  -.*)լ
-*%
/" *'*"$./
)!$ ''
!*- .$")
)
*)./-0
/$*)*!) 2($3 և0.  1 '*+( )/+-*%
/'*

/ 
//# 
*-( -
'*(+

/

)!$''$)
-.*)լ
'$!*-)$
ի$ '$)1 ./$"
/$*)$)
'0 /# -$''$)"*!*5 ).*!#*''*2և./ (

0" -
*-$)".
1 )
( )/
1 )
/#-*0"#'
)!$''- !0. 
)+ ) /-
/$)")
/$1 (
/ -$
'./*
$$) .$")*!
+!*0)
/$*).4./ (ի*)./-0
/$*)+#
. . -1$
.$)
'0 /# *1 -.$"#/*!/# $)./
''
/$*)*!*1 -ԷլԺԵԵ+-

./

*)
- / +$' .ի
SR-55 Widening I-405 to I-5 | 
)/
)
լ
/
!!/
(!*-/# !$1 
'/ -)
/$1 .!*-$(+-*1$)"/# ևԺԺ2 - 
*).$ - $)1*'1$)"/# 
$/$*)*!
03$'$
-4
)֨*-
" ) -
'և+0-+*. '
) .$)

#$-
/$*)
/2 )
ևԹԵԺ
)
ևԺի -
)/
. +-*1$ " */
#)$

'
) )1$-*)( )/
'
. -1$
.!*-/# -*%
/++-*1
'
))1$-*)( )/
'*
0( )/֢֣լ
''*!2#$
#2 - 
++-*1 
4
'/-
).ի
Norwalk Transit Oriented Development (Former Correctional Youth Authority Facility) | *-2 '&լ
/
!!
(!*-/# +-*+*. +-*%
/+'
)./*-  1 '*+ԸԷ

- .*!/# !*-( -
*--
/$*)
'4*0/#!

$'$/4$)/*
($3 և

0. "$1$)"-$. /*ԺԻլԵԵԵ.,0
- ! /*!- /
$'֨*!!$
.+

լԾԺԺ
+
-/( )/.
)/*2)#*( .$)
'0$)"ԹԵԵ

!!*-

' 0)$/.լ
Ըև /*Թև./*-4#*/ 'լ
)

*((0)$/4+
-&ի
21670
Verdantas.com
City of San Clemente | On-Call Geotechnical Plan Check Services APPENDIX 2
Sample Plan Review
Correction Lists & Forms
22671
Project No. 21272
Comments were uploaded to e-PlanReview (ePR)
Project: Gasoline Service Station and Convenience Store Permit No. GRA2024-03996
Report 1: Geotechnical Investigation, G&M Oil Company Facility #128, 727 South East Street, Anaheim, California, by Southern California Geotechnical, dated August 31, 2023, Revised January 25, 2024 1st Round Review Comments (1/6/25)

Page 14 ends