Text extracted from the city's file for reading and search. Open the original on san-clemente.legistar.com. That file is the official record.

ATTACHMENT G

POLICY FOR DISTRIBUTION OF FORFEITED AND SEIZED ASSETS

BACKGROUND
The Orange County Sheriff’s Department provides contract law enforcement services to cities in Orange County. Because of the increased likelihood that contracted patrol or investigation personnel may become involved in significant narcotic seizures, which could affect law enforcement services provided by the Sheriff’s Department to contract cities, the following policy is in effect.

CONTRACTED PATROL AND INVESTIGATION OFFICERS
When assets (cash or property) are seized in CITY by contracted patrol or investigation personnel, and subsequently forfeited to COUNTY’s Sheriff Department, hereinafter referred to as “SHERIFF”, the forfeited assets shall be shared with CITY as set forth below, for the purpose of augmenting law enforcement services in CITY, subject to guidelines by the forfeiting agency of such sharing and use of forfeited assets. A portion of forfeited assets may be retained by SHERIFF, to pay for departmental expenses not recovered through law enforcement contracts.

In such cases, pursuant to the forfeiting agency’s guidelines, SHERIFF shall apply to the forfeiting agency for the return of a share of assets. In his application, SHERIFF shall specify the percentage of shared assets returned to SHERIFF that will be used to augment law enforcement services in CITY and the use of said assets by CITY.

In those cases in which assets are seized within CITY by personnel assigned to CITY pursuant to this Agreement, without the involvement of other law enforcement personnel, and in which the seizure is a result solely of activities self-initiated by SHERIFF personnel assigned to CITY or initiated by said personnel in response to calls for service within CITY, SHERIFF shall apply to have all of the assets used to augment CITY law enforcement services.

In those cases in which SHERIFF personnel assigned to CITY pursuant to this Agreement play an ancillary role in a seizure or in which other law enforcement personnel are involved in a seizure, SHERIFF shall determine the percentage of the total forfeited assets for which he will apply to augment CITY’s law enforcement services. This determination will be based on the circumstances of the seizure, including the pro-rata involvement of all personnel, including those assigned to CITY.

Each seizure will be evaluated on an individual and independent basis, and said evaluations will be available for review to CITY’s manager. Examples of those incidents which would be evaluated as set forth in this section include situations in which a contract patrol deputy provides uniformed backup at a SHERIFF’s Narcotic Bureau search warrant location or in which contract investigators participate in the service of a search warrant that was initiated by non-contract law enforcement personnel.

Assets (cash or property) that are returned to SHERIFF by the forfeiting agency with the understanding that they will be used to augment CITY law enforcement services shall be used by CITY and SHERIFF only for such purposes. If the forfeiting agency attaches additional or more specific conditions to the use of said assets, CITY and SHERIFF shall also abide by those conditions. SHERIFF and CITY’s manager shall determine the specific use of said assets within the conditions imposed by the forfeiting agency. 5/7/2020 Rev.
152

Page 1 of 2 ends

ATTACHMENT H

SPECIAL SERVICES
The purpose of this attachment is to define, in greater detail, the areas of responsibility, between the City of San Clemente, hereinafter referred to as “City” and County of Orange, Sheriff-Coroner, hereinafter referred to as “Sheriff”.

A. USAGE OF SAN CLEMENTE POLICE STATION BUILDING AND PROPERTY

1. Personnel Authorized to Use the Facility
Sheriff will utilize the Police Station building located at the City Hall to house and deploy Sheriff employees whose services are contracted to City.

2. Fuel Delivery
(a) Except when it is necessary for Sheriff personnel to obtain fuel from another source, City will purchase, and provide via City’s fuel pumps, all fuel used by vehicles to provide services contracted to City, except for the motorcycles. When it is necessary for Sheriff personnel to obtain fuel for vehicles other than the motorcycles from a source other than City’s fuel pumps, City will reimburse Sheriff for the cost of such fuel purchases. .
(b) Sheriff will purchase fuel used by the motorcycles to provide services contracted to City. City will reimburse Sheriff for all costs of fuel for the motorcycles. .

3. Booking Prisoners
Prisoners detained in City will be booked into the Sheriff Intake-Release Center.

Prisoners will not be booked or housed at the Police Station.

4. Fingerprinting and Copying Services
Fingerprinting and copying services will be performed by Sheriff employees located at the Police Station.

B. OWNERSHIP AND MAINTENANCE OF FACILITY AND PROPERTY

1. Ownership
City shall retain title to the land and building used for the San Clemente Police Station.

2. Facility Maintenance
City shall provide routine daily janitorial services and supplies as referenced in the lease agreement. Sheriff will augment City’s services by using Sheriff Community Work Program participants to perform additional daytime housekeeping and maintenance tasks.

3. Utility, Maintenance and Routine Repair Costs
City shall pay all utility, maintenance and routine repair costs, including telephone charges. City shall maintain the existing telephone system.

4. Equipment Ownership, Maintenance and Replacement
City shall retain ownership of City purchased office furniture and equipment at the Police Station. City computers and related hardware are to be serviced and maintained by City.
153

Page 2 of 2 ends

C. SATELLITE OFFICE SPACE AT THE OUTLETS AT SAN CLEMENTE:

The County, by and through Sheriff, has entered into a separate License Agreement with Villa San Clemente, LLC, a California limited liability company (hereinafter referred to as “Licensor”) for Sheriff to have satellite office space at The Outlets at San Clemente (hereinafter referred to as “License Area”) for use by Sheriff’s personnel assigned to City.

A copy of the License Agreement has been provided to City. City will not be a party to this License Agreement but agrees to provide the following contributions for the development and financial support of the License Area:

1. City will reimburse Sheriff for interior maintenance, repairs and janitorial services and supplies for the License Area that occur after the Commencement Date of the License.

D. REVENUE GENERATED BY CITY SERVICES AND ACTIVITIES
Revenue generated by City fees, including but not limited to the following, will be at rates established by City and will be retained by City. x Bicycle licensing
x Fingerprinting
x Visa letters
x Report duplication
x DUI cost recovery
x Special police services
154
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: (1)
155
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org
Council Chambers

CITY OF SAN CLEMENTE
Tuesday, May 20, 2025
City Council
Regular Meeting Minutes
5:30 p.m. - Business Meeting
Mayor Knoblock
Mayor Pro Tem Enmeier
Councilmember Cabral
Councilmember Loeffler
Councilmember Wu
These minutes reflect the order in which items appeared on the meeting agenda and do not necessarily reflect the order in which items were actually considered.

A Regular Meeting of the San Clemente City Council was called to order by Mayor Knoblock on May 20, 2025 at 5:32 p.m. in the San Clemente City Council Chambers, located at 910 Calle Negocio, 2nd Floor, San Clemente.

PRESENT: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock STAFF PRESENT: Andy Hall, City Manager; Elizabeth Mitchell, City Attorney; Laura Campagnolo, City Clerk; Megan Jimenez, Deputy City Clerk

CLOSED SESSION
None.

BUSINESS MEETING

INVOCATION
Pastor Jared Powell, Paradigm Church, gave the invocation.

PLEDGE OF ALLEGIANCE
Councilmember Wu led the Pledge of Allegiance.

1. Special Presentations
None.

2. Oral Communications (Part 1)
Lois McNicoll commented on the placement of rip rap boulders by the Orange County Transportation Authority (OCTA) along the railroad tracks; expressed concerns regarding behavior of a park ranger.

Amanda Quintanilla narrated a PowerPoint presentation entitled "South Coast Air Quality Management District". A hard copy of the presentation is on file with the City Clerk.

Page 1 of 18 ends

156
City Council Regular Meeting Minutes May 20, 2025
Reva Buck expressed concerns regarding the Broadmoor Homeowners Association's enforcement of trees exceeding height restrictions within the association; urged the City Council to get an update from Broadmoor Homeowners Association on enforcement.

Bill Garcia expressed concerns regarding the Broadmoor Homeowners Association's enforcement of trees exceeding height restrictions within the association; urged the City Council to get an update from Broadmoor Homeowners Association on enforcement.

Joe Wilson, San Clemente, spoke on the proposed sand placement by the Orange County Transportation Authority (OCTA) on San Clemente beaches; expressed concerns regarding safety of placing black sand on the beaches.

Amber Gregg, PierPride, presented a donation of $25,000 on behalf of PierPride to the City for the purchase of a new Christmas tree to be placed on the pier.

Suzie Whitelaw, Save our Beaches San Clemente, opined on the proposed black sand placement by the Orange County Transportation Authority (OCTA).

Eric Fermin expressed concerns regarding the Broadmoor Homeowners Association's enforcement of trees exceeding height restrictions within the association; urged the City Council to get an update from Broadmoor Homeowners Association on enforcement.

Abby Paulson, representing Supervisor Foley, provided an update on action Supervisor Foley is taking concerning sand placement on San Clemente beaches, rail maintenance, nuclear waste removal and the proposed battery storage facility in San Juan Capistrano.

3. Council Member Reports
Councilmember Wu:
· Met with Southern California Association of Governments (SCAG) Senior Government Affairs Officer concerning available grants for the City on May 7, 2025.
· Participated in a ride-a-long with Orange County Sheriff’s Department.

Councilmember Loeffler:
· Attended zoom meetings with the Orange County Transportation Authority (OCTA) and “Lowers 28” (discussed Olympics during both meetings) on May 7, 2025.
· Met with a Sea Summit resident regarding bond refunding on May 7, 2025. · Met with Sgt. Streeter (Orange County Sheriff’s Department) regarding the Neighborhood Watch program on May 8, 2025.
· Toured the beach and received an update from Marine Safety on May 8, 2025.
· Met with residents regarding issues in North Beach concerning 24 Carrots on

Page 2 of 18 ends

157
City Council Regular Meeting Minutes May 20, 2025
May 8, 2025.
· Attended the ribbon cutting for Judge Brewery on May 9, 2025. · Attended the Children’s Hospital Orange County fundraiser on May 9, 2025. · Met with a resident regarding a Shorecliffs Golf Course issue on May 12, 2025.
· Met with a resident regarding a commercial lighting issue on May 12, 2025. · Met with a resident regarding Pier Bowl crime issues on May 12, 2025. · Met with a resident regarding North Beach crime issues on May 12, 2025. · Met with a resident regarding a special event permit on May 12, 2025. · Attended the San Clemente Chamber of Commerce Mixer at The Villas by the Sea on May 13, 2025.
· Met with a resident regarding a possible illegal massage parlor on May 13, 2025.
· Met with a resident regarding a San Diego Gas & Electric (SDG&E) issue on May 13, 2025.
· Met with City Manager Hall and Golf Course Manager Gilmore regarding a resident complaint on May 14, 2025.
· Attended the Beaches and Parks Foundation Board Meeting on May 15, 2025.
· Met with a resident regarding Max Berg Park crime concerns on May 16, 2025.
· Assisted a resident in connecting him with Orange County Fire Authority (OCFA) regarding Knox Box on May 16, 2025.
· Met with a resident regarding Community Safety and Welfare Committee opportunity on May 16, 2025.
· Attended the San Clemente Sports Wall of Fame induction on May 17, 2025. · Attended a Council briefing with City Manager and City Attorney on May 19, 2025.
· Responded to numerous texts, emails and phone calls from residents during the two-week period in regarding various topics.

Mayor Pro Tem Enmeier:
· Congratulated San Clemente High School students who completed their Advanced Placement (AP) exams.

Councilmember Cabral:
· Attended a dinner with Sheriff Barnes concerning Chilean gangs. · Attended the Community Coffee Chat at the Senior Center on May 9, 2025. · Attended the Cal Cities Orange County Division Board of Directors meeting on May 9, 2025.
· Attended the San Onofre Nuclear Generating Station (SONGS) Community Engagement Panel meeting.
· Attended the Children’s Hospital Orange County fundraiser on May 9, 2025. · Traveled to Washington D.C. and held meetings concerning the impacts of federal budget cuts to the City budget.

Page 3 of 18 ends

158
City Council Regular Meeting Minutes May 20, 2025
Mayor Knoblock:
· Met with stakeholders concerning sand placement on San Clemente beaches.
· Attended a dinner at California State University, Fullerton on May 8, 2025, honoring Patricia Bates, Tony Rackauckas, and Nick Berardino for their public service.
· Attended the Pregnancy Resource Center fundraiser.
· Met with local residents concerning various issues.
· Announced that San Diego Gas and Electric (SDG&E) will be holding a meeting on May 30, 2025 at Laguna Hills Civic Center.

4. Motion waiving reading in full of all Resolutions and Ordinances Motion by Councilmember Cabral, second by Mayor Pro Tem Enmeier, CARRIED 5-0, to waive reading in full of all Resolutions and Ordinances.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

5. Consideration of agendizing items requiring immediate action None.

6. Closed Session Report - City Attorney
None.

7. Staff Communications
Marine Safety Chief Mellott announced Beach Safety Week May 19-25, 2025; urged beach goers to swim near a lifeguard and understand ocean conditions.

8. Public Hearings
8A. INTRODUCTION (FIRST READING) OF AN ORDINANCE AMENDING EXHIBIT “A” OF CHAPTER 8.22 OF THE SAN CLEMENTE MUNICIPAL

CODE, RELATING TO THE VERY HIGH, HIGH, AND MODERATE FIRE

HAZARD SEVERITY ZONES
Mayor Knoblock opened the Public Hearing.

Community Development Director Atamian and Building Official Ferguson reviewed the contents of the Administrative Report and responded to City Council inquiries.

Mike Kay opined that evacuation routes, historical fires and vegetation maps should be made available for the public to access.

There being no others desiring to speak, Mayor Knoblock closed the Public

Page 4 of 18 ends

159
City Council Regular Meeting Minutes May 20, 2025
Hearing.

Motion by Councilmember Cabral, second by Councilmember Wu, CARRIED 5-0, to:

1. Develop language for the Ordinance that would put the maps in context for the public to better understand what they mean; including how the maps were created and what the Fire Marshall may or may not have included in their analysis, the language should also make clear that the insurance companies create their own risk management maps and these maps should not be relied on for that purpose (i.e. provide the most favorable and educational language for the community).

2. Set an effective date for the Ordinance as July 24, 2025.

3. Continue the public hearing to the June 3, 2025 Regular City Council meeting.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
Motion by Mayor Knoblock, second by Mayor Pro Tem Enmeier CARRIED 5-0, to reconsider Item 8A - INTRODUCTION (FIRST READING) OF AN ORDINANCE AMENDING EXHIBIT "A" OF CHAPTER 8.22 OF THE SAN

CLEMENTE MUNICIPAL CODE, RELATING TO THE VERY HIGH FIRE HAZARD SEVERITY ZONES.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
The City Council revisited item 8A to:

CONTINUE THE PUBLIC HEARING REGARDING THE INTRODUCTION
(FIRST READING) OF AN ORDINANCE AMENDING EXHIBIT “A” OF CHAPTER 8.22 OF THE SAN CLEMENTE MUNICIPAL CODE, RELATING

TO THE VERY HIGH, HIGH, AND MODERATE FIRE HAZARD SEVERITY ZONES
Mayor Knoblock opened the Public Hearing.

Motion by Councilmember Cabral, second by Mayor Pro Tem Enmeier, CARRIED 5-0, to:

1. Develop language for the Ordinance that would put the maps in context for the public to better understand what they mean; including how the maps were created and what the Fire Marshall may or may not have included in their analysis, the language should also make clear that the insurance companies

Page 5 of 18 ends

160
City Council Regular Meeting Minutes May 20, 2025
create their own risk management maps and these maps should not be relied on for that purpose (i.e. provide the most favorable and educational language for the community).

2. Set an effective date for the Ordinance as July 24, 2025.

3. Continue the public hearing to the June 3, 2025 Regular City Council meeting.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

9. Unfinished Business
9A. NATURE-BASED ADAPTATION PROJECT UPDATE - DRAFT FEASIBILITY STUDY
Coastal Administrator Meyerhoff and Chris Webb, Moffat and Nicol, narrated a PowerPoint presentation entitled "Draft San Clemente Nature-Based Coastal Resiliency Project Feasibility Study" and responded to City Council inquiries. A hard copy of the presentation is on file with the City Clerk.

Suzie Whitelaw opined on submergent vs. emergent breakwaters; suggested starting the proposed project in the south to prevent sand from leaving San Clemente.

Amanda Quintanilla spoke in opposition to emergent breakwaters due to environmental concerns.

Motion by Councilmember Loeffler, second by Mayor Knoblock, CARRIED 5-0, to receive and file the Administrative Report dated May 20, 2025 and on file with the City Clerk.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
Meeting Recess
The City Council recessed at 7:12 p.m. and reconvened at 7:19 p.m. with all City Councilmembers present.

Page 6 of 18 ends

161
City Council Regular Meeting Minutes May 20, 2025

10. New Business
10A. CONSIDERATION OF A RESOLUTION INITIATING A ZONING AMENDMENT TO TITLE 17 (ZONING) OF THE SAN CLEMENTE MUNICIPAL CODE TO

MAKE CHANGES TO DESIGN REVIEW SUBCOMMITTEE PROCESSES AND

CHANGES TO CLEANUP, CLARIFY, AND STREAMLINE STANDARDS AND

PROCESSES, AND FINDING THE ACTION EXEMPT FROM THE

CALIFORNIA ENVIRONMENTAL QUALITY ACT
Councilmember Loeffler disclosed that his wife is a member of the Planning Commission.

Community Development Director Atamian and City Planner Lightfoot reviewed the contents of the Administrative Report and responded to City Council inquiries.

Karen Prescott-Loeffler, Planning Commissioner, spoke in support of maintaining the current Design Review Subcommittee process.

Amanda Quintanilla spoke in support of maintaining the current Design Review Subcommittee process.

Larry Culbertson spoke in support of maintaining the current Design Review Subcommittee process.

Barton Crandell, Planning Commissioner and Design Review Subcommittee Member, spoke in support of maintaining the current Design Review Subcommittee process.

Cameron Cosgrove, Planning Commission Chair and Design Review Subcommittee Member, spoke in support of the staff recommendation with alternative 1; opined on the benefits of the Design Review Subcommittee for applicants.

Jordan Segraves spoke in support of maintaining the current Design Review Subcommittee process.

Edward R. Kweskin, San Clemente, opined on the approval process for the Planning Commission as it relates to the requirements and submittals by applicants.

Motion by Councilmember Cabral, second by Councilmember Loeffler, CARRIED 5-0, to:

1. Make no changes to current Design Review Subcommittee (DRSC) processes (Alternative 1).

Page 7 of 18 ends

162
City Council Regular Meeting Minutes May 20, 2025

2. Adopt Resolution No. 25-60, striking the language as proposed in Attachment 1, and initiating a Zoning Amendment to proceed with code cleanups and batch amendments described in this Administrative Report and dated May 20, 2025.

3. Find that initiation of a zoning amendment is not a project and is exempt from the California Environmental Quality Act (CEQA).

4. Direct staff to evaluate making the Design Review Subcommittee review optional for applicants.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
10B. CONSIDERATION OF DESIGN ALTERNATIVES FOR BICYCLE
IMPROVEMENTS ON AVENIDA PICO BETWEEN THE I-5 FREEWAY AND

THE CALLE FRONTERA/AVENIDA PRESIDIO INTERSECTION
Assistant City Engineer Ponsen and Traffic Engineer Kim narrated a PowerPoint presentation entitled "Bicycle Improvements on Avenida Pico Bet. I-5 FWAY and Calle Frontera/Avenida Presidio" and responded to City Council inquiries.

Amanda Quintanilla expressed concerns regarding land stability and safety.

Motion by Councilmember Cabral, second by Mayor Pro Tem Enmeier, CARRIED 5-0, to:

Adopt Resolution No. 25-61, which will:

1. Authorize staff to proceed with design Alternative 1 with Class 1 Deviation as outlined in Attachment 2 of the Administrative Report dated May 20, 2025, and on file with the City Clerk.

2. Authorize staff to initiate negotiations with impacted property owners for potential acquisitions of an easement or land dedication for widening of Avenida Pico.

3. Authorize staff to submit applications for grant opportunities for design and/or construction funding.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

Page 8 of 18 ends

163
City Council Regular Meeting Minutes May 20, 2025
10C. INTRODUCTION (FIRST READING) OF AN ORDINANCE DELETING SECTION 15.08.020(H)(8) AND ADDING CHAPTER 15.19 - ELECTRIC VEHICLE CHARGING STATIONS, TO TITLE 15 - BUILDINGS AND

CONSTRUCTION OF THE SAN CLEMENTE MUNICIPAL CODE, TO PROVIDE

AN EXPEDITED, STREAMLINED PERMITTING PROCESS FOR ELECTRIC

VEHICLE CHARGING SYSTEMS AND FINDING THE ORDINANCE EXEMPT

FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
Jake Strand expressed concerns regarding streamlining as it relates to reduced public input.

Motion by Councilmember Cabral, second by Mayor Knoblock, CARRIED 5-0, to introduce, and conduct the first reading of Ordinance No. 1792 entitled AN

ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN CLEMENTE, CALIFORNIA, DELETING SECTION 15.08.020(H)(8) AND ADDING CHAPTER

15.19 TO TITLE 15 OF THE SAN CLEMENTE MUNICIPAL CODE TO SET

FORTH AN EXPEDITED, STREAMLINED PERMITTING PROCESS FOR
ELECTRIC VEHICLE CHARGING SYSTEMS.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
10D. CONSIDERATION OF AND POTENTIAL INTRODUCTION (FIRST READING)

OF AN ORDINANCE TO IMPOSE TERM LIMITS ON CITY COMMISSIONS

AND/OR COMMITTEES, WITH THE EXCEPTION OF THE PLANNING

COMMISSION
Edward R. Kweskin, San Clemente, suggested an addition to the Ordinance related to the Beaches, Parks and Recreation Commission; the document with suggested language is on file with the City Clerk.

Amanda Quintanilla commented on the importance of having qualified commission and committee members.

Susan Ambrose, San Clemente, spoke on the roll of commission and committee members.

Motion by Councilmember Loeffler, second by Mayor Pro Tem Enmeier, CARRIED 5-0, to:

1. Introduce and conduct the first reading of Ordinance No. 1790 entitled AN

ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN CLEMENTE, CALIFORNIA, ADDING SECTIONS 2.28.080, 2.36.080, 2.43.080, 2.45.080 AND 2.46.080 TO THE MUNICIPAL CODE OF THE CITY OF SAN

CLEMENTE TO ADD TERM LIMITS, RELATING TO THE BEACHES,

PARKS AND RECREATION COMMISSION, GOLF COURSE COMMITTEE,

INVESTMENT ADVISORY COMMITTEE, ARTS AND CULTURE

Page 9 of 18 ends

164
City Council Regular Meeting Minutes May 20, 2025

COMMITTEE, AND COMMUNITY SAFETY AND WELFARE COMMITTEE,
RESPECTIVELY.

2. Add section 5.5 to the Ordinance which will read as follows:
“SECTION 5.5: There shall be a 10-year life time term limit for anyone on any City Commission or Committee with the exception of the Planning Commission.”
AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
Meeting Recess
The City Council recessed at 8:31 p.m. and reconvened at 8:37 p.m. with all City Councilmembers present.
10E. CONSIDERATION OF A RESOLUTION TO INITIATE A ZONING AMENDMENT

RELATED TO THE AMORTIZATION PROCESS OF SHORT-TERM LODGING

UNITS, AND AN INFORMATIONAL REPORT OF EXISTING TRANSIENT

OCCUPANCY TAX REVENUE AND OPPORTUNITIES FOR ENHANCEMENT

OF THAT REVENUE SOURCE
Community Development Director Atamian and City Planner Lightfoot reviewed the contents of the Administrative Report and responded to City Council inquiries.

Amanda Quintanilla narrated a PowerPoint presentation entitled "STLU's Revisions?". A hard copy of the presentation is on file with the City Clerk.

Brad Wright spoke in support of indefinitely allowing short term lodging units (STLUs) in good standing to operate.

Motion by Councilmember Cabral, second by Mayor Knoblock, CARRIED 4-1 (Councilmember Wu voting NOE) to:

1. Extend the amortization period for the amortized short term lodging units (STLUs) on a regular on-going basis subject to annual review as long as there are no major issues/violations for the short term lodging unit.

2. Increase development potential of hotels and motels City-wide through zoning code enhancements or other special exceptions, beyond the zoning modifications currently contemplated as part of the Gateway Overly.

3. Expand the allowed areas or capacities for STLUs, including the option for a limited-term expansion related to the 2028 Olympics or other major regional events.

Page 10 of 18 ends

165
City Council Regular Meeting Minutes May 20, 2025
AYE: Cabral, Enmeier, Loeffler and Mayor Knoblock
NOE: Wu
10F. CONSIDERATION AND POSSIBLE CREATION OF A LOCAL OLYMPIC

COMMITTEE OR AD HOC SUB-COMMITTEE TO ADDRESS THE

OPPORTUNITIES AND CONCERNS ASSOCIATED WITH HOSTING A
PORTION OF THE LOS ANGELES OLYMPIC GAMES 2028
Motion by Councilmember Cabral, DIED FOR A LACK OF SECOND , to establish one ad hoc Olympic 2028 Committee.

Motion by Councilmember Loeffler, second by Mayor Pro Tem Enmeier, CARRIED 5-0, to continue consideration of establishing an ad hoc committee(s) until the June 3, 2025 Regular City Council meeting.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

11. Consent Calendar
Item 11D - NOTICE OF COMPLETION - CAMINO CAPISTRANO CROSSWALK IMPROVEMENTS was removed from the Consent Calendar for discussion.

A. City Council Minutes
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
(1) APPROVE THE CITY COUNCIL SPECIAL MEETING MINUTES OF MAY 2, 2025.
(2) APPROVE THE CITY COUNCIL REGULAR MEETING MINUTES OF MAY 6, 2025.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
B. Commission/Committee Minutes
None.

C. Warrant Register
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:
(1) APPROVE WARRANT NOS.
604268 THROUGH 604388, PAID ON
4-25-25, IN THE AMOUNT OF $709,256.80

Page 11 of 18 ends

166
City Council Regular Meeting Minutes May 20, 2025
(2) APPROVE HAND WRITE NO. 604573,
WIRE TRANSFER NOS. 3233
THROUGH 3241 AND WARRANT NOS.
604389 THROUGH 604572, PAID ON
5-2-25, IN THE AMOUNT OF $1,446,276.82
(3) APPROVE WARRANT NOS.
604574 THROUGH 604686, PAID ON
5-9-25, IN THE AMOUNT OF $3,686,204.61
TOTAL WARRANT REGISTER $5,841,738.23
AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
Payroll Register
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

APPROVE AUTOMATIC DEPOSIT ADVISES
102632 THROUGH 102972, FOR THE PERIOD
4-14-25 THROUGH 4-27-25, PAID
ON 5-2-25, IN THE AMOUNT OF $529,954.59
TOTAL PAYROLL REGISTER $529,954.59
AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
11E. NOTICE OF COMPLETION - THREE LIFEGUARD TOWERS REPLACEMENT (2024)
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

Adopt Resolution No. 25-64, which will:

1. Accept three Lifeguard Towers Replacement, CIP Project No. 22104, from the contractor, Pantheon Diversified, Inc.

2. Authorize the City Clerk to execute and record the Notice of Completion for the completed three Lifeguard Towers Replacement.

3. Authorize the City Clerk to release the Payment Bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the contractor, Pantheon Diversified, Inc.

4. Authorize the City Clerk to release the performance bond for this project upon

Page 12 of 18 ends

167
City Council Regular Meeting Minutes May 20, 2025
receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
11F. NOTICE OF COMPLETION - RICHARD T. STEED MEMORIAL PARK PUMP TRACK
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

Adopt Resolution No. 25-65, which will:

1. Accept the San Clemente Pump Track, CIP No. 15109, from the contractor, American Ramp Company.

2. Authorize the City Clerk to execute and record the Notice of Completion for the San Clemente Pump Track.

3. Authorize the City Clerk to release the payment bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the contractor, American Ramp Company.

4. Authorize the City Clerk to release the performance bond.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
11G. CONTRACT AWARD - FOR AS-NEEDED ENGINEERING DEVELOPMENT

PLAN REVIEW SERVICES
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

Adopt Resolution No. 25-66, which will:

1. Award professional services agreements to Derek J. McGregor Inc. (dba DMc Engineering), West Coast Civil, Inc., and TKE Engineering, Inc. for on-call as-needed engineering plan check services.

2. Approve, and authorize the City Manager to execute, Contract No. C25-24, by and between the City of San Clemente and Derek J. McGregor Inc. (dba DMc Engineering), providing for on-call as-needed engineering plan check services, for a term of three (3) years in an amount not to exceed $70,000 annually with two optional one-year extensions exercisable in the City Manager’s discretion.

Page 13 of 18 ends

168
City Council Regular Meeting Minutes May 20, 2025

3. Approve, and authorize the City Manager to execute, Contract No. C25-25, by and between the City of San Clemente and West Coast Civil, Inc., providing for on-call as-needed engineering plan check services, for a term of three (3) years in an amount not to exceed $70,000 annually with two optional one-year extensions exercisable in the City Manager’s discretion.

4. Approve, and authorize the City Manager to execute, Contract No. C25-26, by and between the City of San Clemente and TKE Engineering, Inc., providing for on-call as-needed engineering plan check services, for a term of three (3) years in an amount not to exceed $70,000 annually with two optional one-year extensions exercisable in the City Manager’s discretion AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
11H. CONTRACT AWARD - PURCHASE AND INSTALLATION OF STORM DRAIN

TRASH CAPTURE DEVICES FOR THE EL CAMINO REAL CORRIDOR

RUNOFF TREATMENT PROJECT, AUTHORIZING A RELATED

APPROPRIATION AND FINDING THE PROJECT CATEGORICALLY EXEMPT

FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

Adopt Resolution No. 25-67, which will:

1. Authorize an appropriation of $328,000 from an Orange County Transportation Authority (OCTA) Environmental Cleanup Program Grant to Account No. 057-543-43690-000-26802.

2. Find the El Camino Real Corridor Runoff Treatment Project, CIP Project No. 26802, categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing facilities, 14 CCR Section 15301) of the State CEQA Guidelines.

3. Authorize an exemption to the competitive bidding requirements for and award the El Camino Real Corridor Runoff Treatment Project contract to G2 Construction, Inc. as a cooperative purchase.

4. Approve, and authorize the City Manager to execute, Contract No. C25-27, by and between the City of San Clemente and G2 Construction, Inc., providing for the El Camino Real Corridor Runoff Treatment Project, in an amount not to exceed $410,000, in a form substantially similar to Contract No. C25-27 (Attachment 5).

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

Page 14 of 18 ends

169
City Council Regular Meeting Minutes May 20, 2025
11I. CONSIDERATION OF A RESOLUTION APPROVING AN ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) M2 ENVIRONMENTAL CLEANUP PROGRAM TIER 1 GRANT SUBMITTAL AND A 20% MATCH FOR THE

INLAND RESIDENTIAL AND RANCHO SAN CLEMENTE INDUSTRIAL

RUNOFF TREATMENT PROJECT AND FINDING THE PROJECT

CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL

QUALITY ACT
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

Adopt Resolution No. 25-68, which will:

1. Find the action and the Inland Residential and Rancho San Clemente Industrial Runoff Treatment Project exempt from the California Environmental Quality Act under Class 1 (Existing Facilities, 14 CCR 15301).

2. Approving and ratifying the submittal of the Orange County Transportation Authority (OCTA) Project X Tier 1 Grant Application (Attachment 4).

3. Accepting any grant funds that are awarded.

4. Approving and authorizing a 20% local funding contribution (match) if the grant is awarded.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None
11J. CONSIDERATION OF A RESOLUTION FOR THE ACCEPTANCE OF 2025

DONATION FROM FRIENDS OF SAN CLEMENTE BEACHES, PARKS &

RECREATION FOUNDATION
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to Adopt Resolution No. 25-69 to accept a donation of $56,595 from the Friends of San Clemente Beaches, Parks & Recreation Foundation to support 2025 recreation programs, events, and scholarships, and to authorize the Beaches, Parks & Recreation Director to ensure the proper disbursements of funds associated with the donation.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

Page 15 of 18 ends

170
City Council Regular Meeting Minutes May 20, 2025
11K. CONSIDERATION OF A RESOLUTION AUTHORIZING A SUPPLEMENTAL

APPROPRIATION FROM THE GOLF CAPITAL REPLACEMENT RESERVE

FOR CLUBHOUSE HVAC REPLACEMENTS AND PLUMBING MAINTENANCE

AND FINDING THE PROJECT CATEGORICALLY EXEMPT UNDER THE

CALIFORNIA ENVIRONMENTAL QUALITY ACT
Motion by Mayor Knoblock, second by Councilmember Cabral, CARRIED 5-0, to:

Adopt Resolution No. 25-70, which will:

1. Authorize a supplemental appropriation of $43,517 from the Golf Capital Replacement Reserve to the Golf Depreciation Reserve Account No. 056- 666-45300-000-00000 for work related to improvements at the golf clubhouse, including the HVAC system and plumbing lines.

2. Find the project categorically exempt from the California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15302 (Class 2, Replacement or Reconstruction, 14 CCR §15302).

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

ITEM REMOVED FROM THE CONSENT CALENDAR FOR DISCUSSION
11D. NOTICE OF COMPLETION - CAMINO CAPISTRANO CROSSWALK

IMPROVEMENTS
Tom Streeter thanked the City Council for the Camino Capistrano crosswalk improvements.

Motion by Councilmember Cabral, second by Mayor Knoblock, CARRIED 5-0, to:

Adopt Resolution No. 25-63, which will:

1. Accept the Camino Capistrano Crosswalk Improvements, CIP Project 15321, from the contractor, Bear Electrical Solutions, Inc.

2. Authorize the City Clerk to execute and record the Notice of Completion for the Camino Capistrano Crosswalk Improvements.

3. Authorize the City Clerk to release the payment bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the contractor, Bear Electrical Solutions, Inc.

Page 16 of 18 ends

171
City Council Regular Meeting Minutes May 20, 2025

4. Authorize the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

12. Oral Communications (Part 2)
Tony Rubolino commented on the "Council Corner" editorial by Mayor Pro Tem Enmeier in the April 24, 2025 edition of the San Clemente Times.

13. Future Agenda Items
Broadmoor Homeowners Association
The City Council requested a memo updating them on the Broadmoor Homeowners Association enforcement efforts concerning trees exceeding the height restriction within the association.

14. Reports
A. Commissions and Committees
None.

B. Council Subcommittee Updates
None.

C. City Attorney
None.

D. City Manager
City Manager Hall reported that the following contract was executed under his signature authority:

1. Community Counterparts Services providing for professional planning consulting services in the amount of $10,000.

15. Adjournment
Motion by Mayor Pro Tem Enmeier, second by Mayor Knoblock, CARRIED 5-0, to adjourn at 9:25 p.m. The next Regular Meeting will be held on June 3, 2025.

Closed Session will begin at 4:30 p.m.The Business Meeting will commence at 5:30 p.m. The meeting will take place at City Hall Council Chambers, located at 910 Calle Negocio, 2nd Floor, San Clemente.

AYE: Cabral, Enmeier, Loeffler, Wu and Mayor Knoblock
NOE: None

Page 17 of 18 ends

172
City Council Regular Meeting Minutes May 20, 2025
_______________________________
MAYOR of the City of
San Clemente, California
_______________________________
CITY CLERK of the City of
San Clemente, California

Page 18 of 18 ends

173
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: (1)

..ag endizedby
..end
Subject:
..titl e
PUBLIC SAFETY COMMITTEE REGULAR MEETING MINUTES OF APRIL 22, 2025 ..body ..recommendation
..end
174
These minutes were approved at the Public Safety Committee Meeting of 5/27/2025.

CITY OF SAN CLEMENTE

MINUTES OF THE REGULAR MEETING OF THE

PUBLIC SAFETY COMMITTEE
APRIL 22, 2025
City Hall
Council Chambers, 2nd Floor
910 Calle Negocio
San Clemente, CA 92673

1. CALL TO ORDER
Chair Berkuta called the Regular Meeting of the Public Safety Committee of the City of San Clemente to order at 3:05 p.m.

2. PLEDGE OF ALLEGIANCE
Chair Berkuta led the Pledge of Allegiance.

3. ROLL CALL
Committee
Members Present: Chair Nick Berkuta
Vice Chair Michael Greenwald
Tom Hazelton
Captain Justin Chevalier
Chief Rod Mellott
Chief Cheyne Maule
Committee
Members Absent: Mark Rhoden
Staff Present: Adam Atamian, Community Development Director Natanya Wilcher, Office Specialist II
Rachel Perez, Administrative Assistant, Public Works

4. SPECIAL ORDERS OF BUSINESS / PRESENTATIONS
None.

5. MINUTES
A. Minutes from the Regular Public Safety Committee Meeting of March 25, 2025
DRAFT
175

Page 2 ends

Minutes of the Regular Meeting of the Public Safety Committee of April 22, 2025

MOTION BY VICE CHAIR GREENWALD, SECOND BY MEMBER HAZELTON, AND CARRIED 3-0-1, MEMBER RHODEN ABSENT, to approve the minutes.

6. ORAL AND WRITTEN COMMUNICATION
None.

7. REVEWS AND RECOMMENDATIONS
A. Care Ambulance Performance Measures FY2025 Q2
In response to Committee questions, Chief Maule explained that ambulances went on all medical aid calls; and there were minimal calls for homeless persons.

B. OCFA Performance Measures FY2025 Q2
Chief Maule summarized the Q2 performance measures.

In response to Committee questions, Chief Maule discussed San Clemente response times compared to other jurisdictions; equipment replacement plan; HeloPods; lessons learned from LA County fires; residential inspections; and Water Department review of reservoirs and hydrants.

8. NEW BUSINESS – None.

9. UNFINISHED BUSINESS
A. Public Safety Committee Annual Work Plan FY2024-2025 (1) Communications and Disaster Preparedness Project Update Chair Berkuta discussed tsunami kiosk maps at Balboa Island in Newport Beach; and the Ready, Set, Go! Program presentation.
(2) Homelessness and Best Management Practices for Public Safety Personnel Project Update
None.
(3) Neighborhood Watch
Vice Chair Greenwald discussed upcoming community meetings; recruitment of additional block captains; Police Escort to Schools; Bicycle Safety Awareness Month in May; and new off-road equipment obtained by OCSD.

DRAFT
176

Page 3 ends

Minutes of the Regular Meeting of the Public Safety Committee of April 22, 2025 (4) Statistical Information and Review
None.
(5) Human Trafficking
None.
(6) E-Bicycle/Traffic Safety
Community Development Director Atamian stated the City’s new e-bike ordinance was adopted by the City Council.
(7) Technology Review
None.
(8) Review of Urgent Matters
None.
(9) Park Ranger Program
None.

10. REPORTS OF COMMITTEE MEMBERS AND STAFF
A. Police Services – Orange County Sheriff’s Department Capt. Chevalier Captain Chevalier provided an update on Police Services response times, notable arrests, and Flock cameras.

B. Fire Services – Orange County Fire Authority, Chief Maule Chief Maule discussed Dozer School at Camp Pendleton; upcoming Fire School; and Wildfire Preparedness.

Chair Berkuta discussed his experience with home hardening.

C. Marine Safety – Marine Safety Division Chief Mellott Chief Mellott provided an overview of recent statistics; notable incidents; lifeguard training; and special event permits.

In response to Committee questions, Chief Mellot discussed panga boats on the beach; and updates on the Mariposa Bridge project.

DRAFT
177

Page 4 ends

Minutes of the Regular Meeting of the Public Safety Committee of April 22, 2025 D. Committee Chair
Chair Berkuta indicated he would not be reapplying for the Committee following his term expiring on June 30, 2025
E. Committee members
None.

F. City Staff
Community Development Director Atamian discussed the Council’s modifications to City Committees and Commissions and impact to the Public Safety Committee; and Council’s approval of staffing changes including an Emergency Management Specialist.

In response to Committee questions, Community Development Director Atamian stated Neighborhood Watch signs fell under the Public Works Department.

11. ADJOURNMENT

MOTION BY VICE CHAIR GREENWALD, SECOND BY MEMBER HAZELTON, AND CARRIED 3-0-1, MEMBER RHODEN ABSENT, to adjourn the meeting at 3:42 p.m., to a Regular Meeting of the Public Safety Committee scheduled to be held on Tuesday, May 27, 2025, at 3:00 p.m. at City Hall in Council Chambers at 910 Calle Negocio, San Clemente, California.

Respectfully submitted,
______________________________
Nick Berkuta, Chair
Attest:
_______________________________
Adam Atamian, Community Development Director
DRAFT
178
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: (1)
..ag endizedby
..end
Subject:
..titl e
Approve Wire Transfer Nos.
3242 through 3247 and Warrant Nos.
604687 through 604831, paid on
5-16-25, in the amount of $1,664,625.69
..end
179
180
181
182
183
184
185
186
187
188
189
190
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: (2)
..ag endizedby
..end
Subject:
..titl e
Approve Warrant Nos.
604832 through 604959, paid on
5-23-25, in the amount of $946,837.57
TOTAL WARRANT REGISTER $2,611,463.26 ..end
191
192
193
194
195
196
197
198
199
200
201
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item:
..ag endizedby
..end
Subject:
..titl e
Approve Warrant No. 978 and
Automatic Deposit Advises 102973
through 103329, for the period
4-28-25 through 5-11-25, paid
on 5-16-25, in the amount of $534,311.81
TOTAL PAYROLL REGISTER $534,311.81 ..end
202
203
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11D.
204
Attachment 1
ORDINANCE NO. 1790

AN ORDINANCE OF THE CITY COUNCIL OF THE

CITY OF SAN CLEMENTE, CALIFORNIA, ADDING
SECTIONS 2.28.080, 2.36.080, 2.43.080, 2.45.080
AND 2.46.080 TO THE MUNICIPAL CODE OF THE

CITY OF SAN CLEMENTE TO ADD TERM LIMITS,

RELATING TO THE BEACHES, PARKS AND

RECREATION COMMISSION, GOLF COURSE

COMMITTEE, INVESTMENT ADVISORY

COMMITTEE, ARTS AND CULTURE COMMITTEE,

AND COMMUNITY SAFETY AND WELFARE

COMMITTEE, RESPECTIVELY
WHEREAS, at its regular meeting of May 6, 2025, the San Clemente City Council expressed a desire to add term limits to certain City Commissions and Committees effective beginning in 2026; and
WHEREAS, Commission and Committee member terms are currently two years; and
WHEREAS, the City Council believes that setting term limits of a total of four full terms (8 years) for all Commission and Committee Members, except for the Planning Commissioners, will provide more opportunity for public participation and is in the best interests of the City; and
WHEREAS, Commission and Committee members must reapply for their respective Commission or Committee at the end of their two-year term, regardless of the implementation of term limits; and
WHEREAS, setting term limits for Commission and Committee Members requires additions to the San Clemente Municipal Code (SCMC); and WHEREAS, the City Council introduced and conducted a first reading of the ordinance at its regular meeting on May 20, 2025, and considered any public input provided at that time.

NOW, THEREFORE, the City Council of the City of San Clemente, California, hereby ordains as follows:

SECTION 1: Section 2.28.080, relating to term limits for the Beaches, Parks and Recreation Commission, is hereby added to the SCMC to read in its entirety as set forth in Exhibit A attached hereto and incorporated fully herein. 205
Ordinance No. 1790 Page 2
SECTION 2: Section 2.36.080, relating to term limits for the Golf Course Committee, is hereby added to the SCMC to read in its entirety as set forth in Exhibit B attached hereto and incorporated fully herein.

SECTION 3: Section 2.43.080, relating to term limits for the Investment Advisory Committee, is hereby added to the SCMC to read in its entirety as set forth in Exhibit C attached hereto and incorporated fully herein.

SECTION 4: Section 2.45.080, relating to term limits for the Arts and Culture Committee, is hereby added to the SCMC to read in its entirety as set forth in Exhibit D attached hereto and incorporated fully herein.

SECTION 5: Section 2.46.080, relating to term limits for the Community Safety and Welfare Committee, is hereby added to the SCMC to read in its entirety as set forth in Exhibit E.

SECTION 5.5: There shall be a 10 year life time term limit for anyone on any City Commission or Committee with the exception of the Planning Commission.

SECTION 6: If any section, subsection, subdivision, paragraph, sentence, clause or phrase added by this Ordinance, or any part thereof, is for any reason held to be unconstitutional or invalid or ineffective by any court of competent jurisdiction, such decision shall not affect the validity or effectiveness of the remaining portions of this Ordinance or any part thereof. The City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause or phrase thereof irrespective of the fact that any one or more subsections, subdivisions, paragraphs, sentences, clauses or phrases are declared unconstitutional, invalid or ineffective.

SECTION 7: The City Clerk shall certify to the adoption of this ordinance and cause it, or a summary thereof, to be published once within fifteen (15) days of adoption in a newspaper of general circulation printed and published within the City of San Clemente, and shall post a certified copy of this ordinance, including the vote for and against the same, in the Office of the City Clerk in accordance with California Government Code Section 36933.

SECTION 8. This Ordinance shall become effective 30 days after its adoption.

APPROVED AND ADOPTED this _____day of _________________, ________.

ATTEST:
_______________________________ ___________________________ City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California 206
Ordinance No. 1790 Page 3

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, hereby certify that Ordinance No. 1790 having been regularly introduced at the meeting of _______________________, was again introduced, the reading in full thereof unanimously waived, and duly passed and adopted at a regular meeting of the City Council held on the _____day of _____________, _______, and said ordinance was adopted by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of ______________________, ________.
__________________________
CITY CLERK of the City of
San Clemente, California
APPROVED AS TO FORM:
________________________________
Elizabeth A. Mitchell, CITY ATTORNEY
207
Ordinance No. 1790 Page 4

EXHIBIT A
Chapter 2.28 BEACHES, PARKS AND RECREATION COMMISSION

2.28.010 Establishment of the Beaches, Parks and Recreation Commission; composition; appointment of members.

There is established a Beaches, Parks and Recreation Commission which shall consist of nine San Clemente citizens appointed by the City Council. At least three of the members shall have a background or technical experience in coastal issues.

2.28.020 Function.

The Beaches, Parks and Recreation Commission's functions and duties are to:

A. Act in an advisory capacity to the City Council in all matters pertaining to parks, beaches, recreation, parkways, and coastal issues as identified by the City Council;
B. Make recommendations to the City Council and advise the City Council in matters pertaining to the creation, operation, maintenance, management, and control of community recreation programs, playgrounds, and indoor and outdoor recreations, activities, and facilities;
C. Provide feedback on projects to be considered during the annual budget for parks, beaches, recreation, and parkways during the preparation of the annual budget and make recommendations with respect thereto to the City Council and the City Manager;
D. Assist in the planning of parks and support the coordination of recreation programs for the public, promote and stimulate public interests therein, and to that end solicit, to the fullest extent possible, the cooperation of all public and private agencies interested therein;
E. Evaluate and review park development plans of the City; F. Serve as a sounding board for citizen input on matters relating to coastal areas adjacent to, or having the ability to affect, the City of San Clemente; G. Participate in the Social Services Grant Subcommittee by appointing one member of the Commission, by majority vote, no later than December 31 of each year; H. Develop an annual work plan with specific goals and objectives for the coming year. The work plan, with recommendations, shall be submitted to the City Council no later than October 1 of each year. The plan shall be submitted in written form for approval at a City Council meeting. Any amendments to the work plan shall require Council approval;
208
Ordinance No. 1790 Page 5
I. Limit meetings to three hours unless otherwise approved by a majority vote of the Commission plus the concurrence of the primary staff support to the Commission; and
J. Perform such other duties as may be prescribed by the City Council.

2.28.030 Beaches, Parks and Recreation Commission—Term of office.

The terms of office of members of the Beaches, Parks and Recreation Commission shall be for two years from July 1st to June 30th of the second following year, and with such terms staggered so that four Commissioners are appointed in even-numbered years and five Commissioners are appointed in odd-numbered years. Annually, at the first meeting after the newly appointed Commission members assume office in July, the Commission shall select a chair and vice-chair from among its members. No less than 60 days prior to the expiration of terms, the City Clerk shall notify the City Council of the forthcoming vacancies and the City Council shall make the necessary appointments prior to the expiration of the terms. In the event the City Council does not make the necessary appointments prior to the expiration of the terms, existing members with expiring terms shall continue to serve as Beaches, Parks and Recreation Commissioners until successors are appointed by the City Council and assume office.

2.28.040 Meetings—Attendance.

The Beaches, Parks and Recreation Commission shall hold meetings bi-monthly (every two months) in accordance with the rules of procedure to be enacted and recorded in a book of official proceedings. The location, dates, time, and organization of Beaches, Parks and Recreation Commission meetings shall be established by resolution of the Beaches, Parks and Recreation Commission. Any member of the Beaches, Parks and Recreation Commission who is absent from two consecutive regular meetings of the Beaches, Parks and Recreation Commission, without furnishing to the City Clerk a certificate of illness from a duly practicing physician, or without the authorization of the Beaches, Parks and Recreation Commission to be absent from two consecutive regular meetings for good cause, shall, as a result, surrender his or her office on the Beaches, Parks and Recreation Commission and the office shall be considered vacant.

2.28.050 Filling of vacancies—Removal of members.

Any vacancy occurring in the office of a member of the Beaches, Parks and Recreation Commission shall be filled in the same manner as the original appointment, and a successor shall hold office for the unexpired portion of the term of his or her predecessor. Each member of the Beaches, Parks and Recreation Commission shall serve at the pleasure of the City Council and may be removed from office with or without cause during his or her term in office by a majority vote of all members of the City Council. 209
Ordinance No. 1790 Page 6

2.28.060 Voting power of members.

The members of the Beaches, Parks and Recreation Commission shall each have one vote on any matter pending before the commission.

2.28.070 Commission subject to state law, etc.

The Beaches, Parks and Recreation Commission shall be subject to the rules and regulations regarding the conduct of meetings under state and city law and to the provisions of this Code and any other ordinance of the City.

2.28.080 Term Limits.

Effective July 1, 2026, Beaches, Parks and Recreation Commissioners shall be subject to a term limit of four full 2-year terms (8 years total). Appointments mid-term shall not count toward such limit. Beaches, Parks and Recreation Commissioners members must reapply for their seat at the end of each two-year term, regardless of the implementation of term limits. Commission and Committee members may serve on only one Commission or Committee at a time. The City Council may exercise its discretion to waive any of the foregoing limitations if there is a lack of applicants or for other cause. 210
Ordinance No. 1790 Page 7

EXHIBIT B
Chapter 2.36 GOLF COURSE COMMITTEE

2.36.010 Establishment of the Golf Course Committee; composition; appointment of members.

There is established a Golf Course Committee which shall consist of five San Clemente citizens appointed by the City Council.

2.36.020 Function.

The Golf Course Committee's functions and duties are to:

A. Act in an advisory capacity to the City Council in planning pertaining to the use and operation of the municipal golf course;
B. Make suggestions and recommendations to the City Manager and City Council pertaining to the annual budget for the municipal golf course during the process of its preparation;
C. Evaluate and review the restaurant lease, golf pro agreement, and facilities development plans for the municipal golf course;
D. Assist in the preparation of rate schedules for the users of the municipal golf course and make recommendations regarding same to the City Council; E. Develop an annual work plan with specific goals and objectives for the coming year. The work plan, with recommendations, shall be submitted to the City Council no later than October 1 of each year. The plan shall be submitted in written form for approval at a City Council meeting. Any amendments to the work plan shall require Council approval;
F. Limit meetings to three hours unless otherwise approved by a majority vote of the Committee plus the concurrence of the primary staff support to the Committee;
G. Perform such other duties as may be prescribed by the City Council.

2.36.030 Golf Course Committee—Terms of office.

The terms of office of members of the Golf Course Committee shall be for two years from July 1st to June 30th of the second following year, and with such terms staggered so that three Committee members are appointed in even-numbered years and two Committee members are appointed in odd-numbered years. Annually, at the first meeting after the newly appointed Committee members assume office in July, the Committee shall select a chair and vice-chair from among its members. No less than 60 days prior to the expiration of terms, the City Clerk shall notify the City Council of the forthcoming vacancies and the City Council shall make the necessary appointments prior to the expiration of the terms. In the event the City Council does not make the necessary appointments prior to the expiration of the terms, existing members with expiring terms shall continue to serve as Golf Course Committee members until successors are appointed by the City Council and assume office. 211
Ordinance No. 1790 Page 8

2.36.040 Meetings—Attendance.

The Golf Course Committee shall hold meetings quarterly (January, April, July and October) in accordance with the rules of procedure to be enacted and recorded in a book of official proceedings, The location, dates, time and organization of Golf Course Committee meetings, shall be established by resolution of the Golf Course Committee.

Any member of the Golf Course Committee who is absent from three consecutive regular meetings of the Golf Course Committee, without furnishing to the City Clerk a certificate of illness from a duly practicing physician, or without the authorization of the Golf Course Committee to be absent from three consecutive regular meetings for good cause, shall, as a result, surrender his or her office on the Golf Course Committee and the office shall be considered vacant.

2.36.050 Filling of vacancies—Removal of members.

Any vacancy occurring in the office of a member of the Golf Course Committee shall be filled in the same manner as the original appointment, and a successor shall hold office for the unexpired portion of the term of his or her predecessor. Each member of the Golf Course Committee shall serve at the pleasure of the City Council and may be removed from office with or without cause during his or her term in office by a majority vote of all members of the City Council.

2.36.060 Voting power of members.

The members of the Golf Course Committee shall each have one vote on any matter pending before the committee.

2.36.070 Committee subject to state law, etc.

The Golf Course Committee shall be subject to the rules and regulations regarding the conduct of meetings under state and city law and to the provisions of this Code and any other ordinance of the City.

2.36.080 Term Limits.

Effective July 1, 2026, Golf Course Committee Members shall be subject to a term limit of four full 2-year terms (8 years total). Golf Course Committee members must reapply for their seat at the end of each two-year term, regardless of the implementation of term limits. Appointments mid-term shall not count toward such limit. Commission and Committee members may serve on only one Commission or Committee at a time. The City Council may exercise its discretion to waive any of the foregoing limitations if there is a lack of applicants or for other cause.
212
Ordinance No. 1790 Page 9

EXHIBIT C
Chapter 2.43 INVESTMENT ADVISORY COMMITTEE

2.43.010 Establishment of Investment Advisory Committee—Composition— Appointment of Members.

There is established an Investment Advisory Committee which shall consist of five members. All members of the Investment Advisory Committee shall be San Clemente citizens, with the exception of the Industry Specialist representative who is not required to reside in San Clemente. The City Council shall appoint two San Clemente citizens and one current member of the City Council to serve on the Committee. The Committee shall also consist of the City Treasurer, who shall serve as Chair of the Committee, as well as one Industry Specialist to be appointed by the City Treasurer.

2.43.020 Function.

The Investment Advisory Committee's functions and duties are to:

A. Review and recommend City Investment policies to the City Council; B. Review investment practices for performance and conformance to adopted policies and procedures;
C. Limit meetings to three hours unless otherwise approved by a majority vote of the Committee plus the concurrence of the primary staff support to the Committee;
D. Perform such other duties as may be prescribed by the City Council.

2.43.030 Investment Advisory Committee—Terms of Office.

The terms of office of the Investment Advisory Committee members shall be as follows:

City Treasurer (Chair) - Serves during the City Treasurer's term of office and until a new City Treasurer assumes office.

Two citizen members appointed by the City Council - The terms of the City Council appointed citizen representatives to the Investment Advisory Committee shall be for two years from July 1st to June 30th of the second following year, and with such terms staggered so that one (1) Committee member is appointed in even-numbered years and one Committee member is appointed in odd-numbered years. No less than 60 days prior to the expiration of the term of a Council-appointed citizen member, the City Clerk shall notify the City Council of the forthcoming vacancy and the City Council shall make the necessary appointment prior to the expiration of the term. In the event the City Council does not make the necessary appointment prior to the expiration of the term, the existing citizen member with an expiring term shall continue to serve as an Investment Advisory Committee member until a successor is appointed by the City Council and assumes office.
213
Ordinance No. 1790 Page 10
One City Council member appointed by the City Council - Serves a one-year term to be selected in December of each year. Membership on the Investment Advisory Committee will immediately cease if the appointee's status as a member of the City Council should conclude for any reason.

One Industry Specialist appointed by the City Treasurer - Serves during the term of his/her appointing City Treasurer and until a new City Treasurer makes his/her appointment of an Industry Specialist and that person assumes office. The Industry Specialist is not required to reside in San Clemente.

2.43.040 Meetings—Attendance.

The Investment Advisory Committee shall hold meetings quarterly (January, April, July and October) in accordance with the rules of procedure to be enacted and recorded in a book of official proceedings. The location, dates, time and organization of Investment Advisory Committee meetings shall be established by resolution of the Investment Advisory Committee. Any member of the Investment Advisory Committee, who was appointed to the Investment Advisory Committee by the City Council, who is absent from three consecutive regular meetings of the Investment Advisory Committee, without furnishing to the City Clerk a certificate of illness from a duly practicing physician, or without the authorization of the Investment Advisory Committee to be absent from three consecutive regular meetings for good cause, shall, as a result, surrender his or her office on the Investment Advisory Committee and the office shall be considered vacant. If the Industry Specialist member is absent from three consecutive regular meetings of the Investment Advisory Committee, without furnishing to the City Clerk a certificate of illness from a duly practicing physician, or without the authorization of the Investment Advisory Committee to be absent from three consecutive meetings for good cause, he/she may be removed from office at the discretion of the City Treasurer.

2.43.050 Filling of Vacancies—Removal of Members.

Any vacancy occurring in the office of a member of the Investment Advisory Committee shall be filled in the same manner as the original appointment, and a successor shall hold office for the unexpired portion of the term of his or her predecessor. Members of the Investment Advisory Committee who were appointed to the Investment Advisory Committee by the City Council shall serve at the pleasure of the City Council and may be removed from office with or without cause during his or her term in office by a majority vote of all members of the City Council. The Industry Specialist shall serve at the pleasure of the City Treasurer and may be removed from office with or without cause at the will of the City Treasurer.

2.43.060 Voting Power of Members.

The members of the Investment Advisory Committee shall each have one vote on any matter pending before the committee.
214
Ordinance No. 1790 Page 11

2.43.070 Committee Subject to State Law, etc.

The Investment Advisory Committee shall be subject to the rules and regulations regarding the conduct of meetings under state and city law, and to the provisions of this Code and any other ordinance of the City.

2.43.080 Term Limits.

Effective July 1, 2026, Investment Advisory Committee Members shall be subject to a term limit of four full 2-year terms (8 years total). Investment Advisory Committee members must reapply for their seat at the end of each two-year term, regardless of the implementation of term limits. Appointments mid-term shall not count toward such limit.

Commission and Committee members may serve on only one Commission or Committee at a time. The City Council may exercise its discretion to waive any of the foregoing limitations if there is a lack of applicants or for other cause. 215
Ordinance No. 1790 Page 12

EXHIBIT D
Chapter 2.45 ARTS AND CULTURE COMMITTEE

2.45.010 Establishment of the Arts and Culture Committee; composition; appointment of members.

There is established an Arts and Culture Committee which shall consist of seven San Clemente citizens appointed by the City Council and shall be actively involved in the arts.

2.45.020 Function.

The Arts and Culture Committee's functions and duties are to:

A. Act in an advisory capacity to the City Council in all matters pertaining to the arts and cultural program including the feasibility of an amphitheater in San Clemente, developing and making recommendations on arts acquisition and proposals for art works for public buildings and public spaces; B. Recommend rules and regulations necessary for the administration, preservation, and perpetuation of fine arts, performing arts, and aesthetic aspects of the community and make recommendations with respect thereto to the City Council and the City Manager;
C. Elevate arts and cultural events and programming in San Clemente by providing direction and support for continued development and presentation of a variety of arts in the city; foster the inclusion of arts and cultural aspects in local events;
D. Evaluate and review arts and culture plans of the City; E. Develop an annual work plan with specific goals and objectives for the coming year. The work plan, with recommendations, shall be submitted to the City Council no later than October 1 of each year. The plan shall be submitted in written form for approval at a City Council meeting. Any amendments to the work plan shall require Council approval;
F. Limit meetings to three hours unless otherwise approved by a majority vote of the Commission plus the concurrence of the primary staff support to the Commission.

G. Perform such other duties as may be prescribed by the City Council.

2.45.030 Arts and Culture Committee—Term of office.

The terms of office of members of the Arts and Culture Committee shall be for two years from July 1st to June 30th of the second following year, and with such terms staggered so that three Committee members are appointed in even-numbered years and two Committee members are appointed in odd-numbered years. Annually, at the first meeting after the newly appointed Committee members assume office in July, the 216
Ordinance No. 1790 Page 13
Committee shall select a chair and vice-chair from among its members. No less than 60 days prior to the expiration of terms, the City Clerk shall notify the City Council of the forthcoming vacancies and the City Council shall make the necessary appointments prior to the expiration of the terms. In the event the City Council does not make the necessary appointments prior to the expiration of the terms, existing members with expiring terms shall continue to serve as Arts and Culture Committee members until successors are appointed by the City Council and assume office.

2.45.040 Meetings—Attendance.

The Arts and Culture Committee shall hold meetings bi-monthly (every two months) in accordance with the rules of procedure to be enacted and recorded in a book of official proceedings. The location, dates, time and organization of Arts and Culture Committee meetings shall be established by resolution of the Arts and Culture Committee. Any member of the Arts and Culture Committee who is absent from two consecutive regular meetings of the Arts and Culture Committee, without furnishing to the City Clerk a certificate of illness from a duly practicing physician, or without the authorization of the Arts and Culture Committee to be absent from three consecutive regular meetings for good cause, shall, as a result, surrender his or her office on the Arts and Culture Committee and the office shall be considered vacant.

2.45.050 Filling of vacancies—Removal of members.

Any vacancy occurring in the office of a member of the Arts and Culture Committee shall be filled in the same manner as the original appointment, and a successor shall hold office for the unexpired portion of the term of his or her predecessor. Each member of the Arts and Culture Committee shall serve at the pleasure of the City Council and may be removed from office with or without cause during his or her term in office by a majority vote of all members of the City Council.

2.45.060 Voting power of members.

The members of the Arts and Culture Committee shall each have one vote on any matter pending before the commission.

2.45.070 Commission subject to state law, etc.

The Arts and Culture Committee shall be subject to the rules and regulations regarding the conduct of meetings under state and city law and to the provisions of this Code and any other ordinance of the City.

2.45.080 Term Limits.

Effective July 1, 2026, Arts and Culture Committee Members shall be subject to a term limit of four full 2-year terms (8 years total). Arts and Culture Committee members must reapply for their seat at the end of each two-year term, regardless of the implementation of term limits. Appointments mid-term shall not count toward such limit.

Commission and Committee members may serve on only one Commission or Committee 217
Ordinance No. 1790 Page 14
at a time. The City Council may exercise its discretion to waive any of the foregoing limitations if there is a lack of applicants or for other cause. 218
Ordinance No. 1790 Page 15

EXHIBIT E
Chapter 2.46 COMMUNITY SAFETY AND WELFARE COMMITTEE

2.46.010 Establishment of the Community Safety and Welfare Committee; composition, appointment of members.

There is established a Community Safety and Welfare Committee which shall consist of ten members, seven appointed members and three non-voting members. The City Council shall prioritize the appointment of at least four voting members to be technical professionals with a public safety background (such as a retired police, fire, or marine chief, officer, lifeguard, etc.), if possible, and the remaining three voting-members to be appointed at large, to serve on the Community Safety and Welfare Committee.

The Committee shall also consist of one representative of the Orange County Sheriff’s Department (OCSD) to be appointed by San Clemente's Chief of Police Services, one representative of the Orange County Fire Authority (OCFA) to be appointed by San Clemente's Chief of Fire Services, and one representative from the City's Marine Safety Division to be appointed by the City Manager. The OCSD, OCFA, and the Marine Safety Division representatives shall serve as ex-officio, non-voting members. Members of the Community Safety and Welfare Committee need not be residents of San Clemente.

2.46.020 Function.

The Community Safety and Welfare Committee's functions and duties are to:

A. Act in an advisory capacity to the City Council in all matters pertaining to public safety, human needs, including homelessness, and public affairs as identified by the City Council;
B. Review performance measures of the City’s public safety personnel, consisting of Police Services, Fire Services, Ambulance Services, Marine Safety, and Park Rangers, and make recommendations to the City Council pursuant to direction provided by the City Council;
C. Develop an annual work plan with specific tasks, goals and objectives for the Committee to accomplish in the coming year. The work plan, with recommendations, shall be submitted to the City Council no later than October 1 of each year. The plan shall be submitted in written form for approval at a City Council meeting. Any amendments to the work plan shall require Council approval; D. Participate in the Social Services Grant Subcommittee by appointing one member of the Committee, by majority vote, no later than December 31 of each year; 219
Ordinance No. 1790 Page 16
E. Act as a sounding board for public safety and human needs, including homelessness, within the community;
F. Assess the human affairs needs of the community periodically; G. Establish a priority list of identified human needs within the City and reassess periodically;
H. Limit meetings to three hours unless otherwise approved by a majority vote of the Committee plus the concurrence of the primary staff support to the Committee.

I. Perform such other duties as may be prescribed by the City Council.

2.46.030 Community Safety and Welfare Committee —Terms of Office.

The terms of office of the five members of the Community Safety and Welfare Committee who are appointed by the City Council shall be for two years from July 1 to June 30 of the second following year, and with such terms staggered so that three Committee members are appointed in even-numbered years and two Committee members are appointed in odd-numbered years. Annually, at the first meeting after the newly appointed Committee members assume office in July, the Committee shall select a chair and vice-chair from among its members. No less than 60 days prior to the expiration of terms, the City Clerk shall notify the City Council of the forthcoming vacancies and the City Council shall make the necessary appointments prior to the expiration of the terms. In the event the City Council does not make the necessary appointments prior to the expiration of the terms, existing members with expiring terms shall continue to serve as Community Safety and Welfare Committee members until successors are appointed by the City Council and assume office.

The OCSD representative to the Community Safety and Welfare Committee shall serve on the Committee indefinitely during his/her tenure with the OCSD at the will of the Chief of Police Services.

The OCFA representative to the Community Safety and Welfare Committee shall serve on the Committee indefinitely during his/her tenure with the OCFA at the will of the Chief of Fire Services.

The City's Marine Safety Division representative to the Community Safety and Welfare Committee shall serve on the Committee at the will of the City Manager.

2.46.040 Meetings—Attendance.

The Community Safety and Welfare Committee shall hold meetings bi-monthly (every two months) in accordance with the rules of procedures to be enacted and recorded in a book of official proceedings. A Community Safety and Welfare Committee member who was appointed by the City Council who is absent from three consecutive meetings of the Community Safety and Welfare Committee, without furnishing to the City 220
Ordinance No. 1790 Page 17
Clerk a certificate of illness from a duly practicing physician, or without the authorization of the Community Safety and Welfare Committee to be absent from three (3) consecutive meetings for good cause, shall, as a result, surrender his or her office on the Community Safety and Welfare Committee and the office shall be considered vacant.

The OCSD, OCFA and Marine Safety Division representatives to the Community Safety and Welfare Committee may be removed from office at the discretion of the Chief of Police Services, Chief of Fire Services, or City Manager, respectively, if he/she is absent from three consecutive meetings, where their attendance is necessary, of the Community Safety and Welfare Committee, without furnishing to the City Clerk a certificate of illness from a duly practicing physician, or without the authorization of the Community Safety and Welfare Committee to be absent from three consecutive meetings, where their attendance is necessary, for good cause.

2.46.050 Filling of vacancies—Removal of members.

Any vacancy occurring in the office of a Community Safety and Welfare Committee member shall be filled in the same manner as the original appointment, and a successor shall hold office for the unexpired portion of the term of his or her predecessor. Each member of the Community Safety and Welfare Committee who is appointed by the City Council shall serve at the pleasure of the City Council and may be removed from office with or without cause by a majority vote of all members of the City Council. The OCSD representative shall serve at the pleasure of the Chief of Police Services and may be removed from office with or without cause at the will of the Chief of Police Services. The OCFA representative shall serve at the pleasure of the Chief of Fire Services and may be removed from office with or without cause at the will of the Chief of Fire Services. The City's Marine Safety Division representative to the Community Safety and Welfare Committee shall serve on the Committee at the will of the City Manager and may be removed from office with or without cause at the will of the City Manager.

2.46.060 Voting power of members.

The seven members of the Community Safety and Welfare Committee who are appointed by the City Council shall each have one vote on any matter pending before the Committee. The OCSD, OCFA, and Marine Safety Division representatives are nonvoting members.

2.46.070 Committee subject to state law, etc.

The Community Safety and Welfare Committee shall be subject to the rules and regulations regarding the conduct of meetings under state and city law and to the provisions of any ordinance of the City.
221
Ordinance No. 1790 Page 18

2.46.080 Term Limits.

Effective July, 1, 2026, Community Safety and Welfare Committee Members shall be subject to a term limit of four full 2-year terms (8 years total). Community Safety and Welfare Committee members must reapply for their seat at the end of each two-year term, regardless of the implementation of term limits. Appointments mid-term shall not count toward such limit. Commission and Committee members may serve on only one Commission or Committee at a time. The City Council may exercise its discretion to waive any of the foregoing limitations if there is a lack of applicants or for other cause. 222
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11E.
223
Attachment 1
ORDINANCE NO. 1792

AN ORDINANCE OF THE CITY COUNCIL OF THE

CITY OF SAN CLEMENTE, CALIFORNIA, DELETING
SECTION 15.08.020(H)(8) AND ADDING CHAPTER

15.19 TO TITLE 15 OF THE SAN CLEMENTE

MUNICIPAL CODE TO SET FORTH AN EXPEDITED,

STREAMLINED PERMITTING PROCESS FOR

ELECTRIC VEHICLE CHARGING SYSTEMS
WHEREAS, the State of California and the City of San Clemente have consistently promoted and encouraged the use of fuel-efficient electric vehicles; and
WHEREAS, the State of California adopted Assembly Bill 1236, codified as Section 65850.7 to the Government Code, which requires local agencies to adopt an ordinance that creates an expedited and streamlined permitting process for electric vehicle charging systems; and
WHEREAS, creation of an expedited, streamlined permitting process for electric vehicle charging stations would facilitate convenient charging of electric vehicles and help reduce reliance on environmentally damaging fossil fuels; and WHEREAS, Government Code Section 65850.7(9)(1) provides that every city, county, or city and county with a population of less than 200,000 residents shall adopt an ordinance consistent with the goals and intent of Government Code Section 65850.7(a); and
WHEREAS, with the adoption of Chapter 15.19 of Title 15 of the San Clemente Municipal Code (SCMC) pursuant to Assembly Bill 1236, the existing Section 15.08.020(H)(8) of the SCMC, which addresses streamlined electric vehicle charging station projects, is no longer necessary and should be removed in its entirety; and
WHEREAS, these changes require amendments and additions to the SCMC; and
WHEREAS, the City Council introduced and conducted a first reading of the ordinance at its regular meeting on May 20, 2025, and considered any public input provided at that time; and
WHEREAS, updating the SCMC is in the City’s and public’s best interest.

NOW, THEREFORE, the City Council of the City of San Clemente, California, hereby ordains as follows:

SECTION 1. The City of San Clemente City Council hereby finds and 224
Ordinance No. 1792 Page 2
determines that the above recitals are true and correct and incorporates them fully herein.

SECTION 2. Based on substantial evidence in the record as a whole, adoption of this ordinance is exempt from environmental review under the California Environmental Quality Act (CEQA) per CEQA Guidelines Sections 15060(c)(2) and 15061(b)(3) because it includes updates and revisions to streamline and expedite existing regulations pertaining solely to approval of electric vehicle charging stations and merely authorizes administrative activities that will enhance and not have any significant impacts on the environment; per Public Resources Code section 21080(b)(1) and CEQA Guidelines Sections 15060(c)(1) and 15268 because it is a ministerial project required by state law and the City lacks any discretion to adopt the ordinance and because almost all electric vehicle charging station projects that will be authorized by this ordinance will themselves be subject only to nondiscretionary review; per CEQA Guidelines Sections 15301, 15303, and 15304, because the ordinance’s expedited permit processes for electrical vehicle charging stations will result in only minor alterations to existing facilities and involving negligible or no expansion of current or former uses and only a limited number of new small structures and minor alterations to land; and per CEQA Guidelines Section 15308, because the ordinance is required by state law as a measure to reduce harmful emissions from motor vehicles and improve air quality, and contains detailed safety and performance specifications to ensure these goals are achieved.

SECTION 3. Chapter 15.19 of Title 15 is added to the City of San Clemente Municipal Code to read in full as follows:

Chapter 15.19 ELECTRIC VEHICLE CHARGING SYSTEMS EXPEDITED, STREAMLINED

PERMITTING PROCESS

15.19.010 - Definitions
A. "Electric vehicle charging station" or "charging station" means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this Chapter, and delivers electricity from a source outside an electric vehicle into a plug-in vehicle.

B. "Specific, adverse impact" means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.

C. "Electronic submittal" means the utilization of one or more of the following:
a. Electronic mail
b. The Internet
c. Facsimile
225
Ordinance No. 1792 Page 3

15.19.020 - Purpose
The purpose of this Chapter is to comply with Government Code Section 65850.7 and promote and encourage the use of electric vehicles by creating an expedited, streamlined permitting process for electric vehicle charging stations while promoting public health and safety and preventing specific adverse impacts in the installation and use of such charging stations.

15.19.030 - Applicability
This Chapter applies to the permitting of all electric vehicle charging systems in the City of San Clemente. Electric vehicle charging systems legally established or permitted prior to the effective date of this Chapter are not subject to the requirements of this Chapter unless physical modifications or alterations are undertaken that materially change the size, type or components of an electric vehicle charging system in such a way as to require new permitting. Routine operation and maintenance or like-kind replacements shall not require a permit.

15.19.040 - Electric Vehicle Charging System Requirements A. All electric vehicle charging systems shall meet the requirements of the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories, and rules of the Public Utilities Commission regarding safety and reliability.

B. Installation of electric vehicle charging stations shall be incorporated into the load. Calculations of all new or existing electrical services shall meet the requirements of the California Electrical Code. Electric vehicle charging equipment shall be considered a continuous load.

C. Installation of electric vehicle charging stations and associated wiring, bonding, disconnecting means and overcurrent protective devices shall meet the requirements of Article 625 and all applicable provisions of the California Electrical Code.

D. Anchorage of either floor-mounted or wall-mounted electric vehicle charging stations shall meet the requirements of the California Building or Residential Code as applicable per occupancy, and the provisions of the manufacturer's installation instructions. Mounting of charging stations shall not adversely affect building elements.

15.19.050 - Duties of the Building Division and the Building Official 226
Ordinance No. 1792 Page 4
A. All documents required for submission of an electric vehicle charging system application shall be made available on the publicly accessible City of San Clemente website.

B. The City of San Clemente hereby adopts the checklist of all requirements with which electric vehicle charging systems shall comply to be eligible for expedited review as set forth in Exhibit A to this ordinance, which is fully incorporated herein by this reference. Such checklist may be amended by resolution of the City Council.

C. The electric vehicle charging system permit process and checklist shall substantially conform to recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist contained in the Zero-Emission Vehicles in California: Community Readiness Guidebook adopted by the Governor's Office of Planning and Research.

D. The Building Official shall allow the electronic submittal of the electric vehicle charging station application.

E. Electric vehicle charging stations cannot be installed or utilized until approval is granted by the Building Official.

15.19.060 - Permit Application Processing
A. Review of the electric vehicle charging system permit application shall be limited to the Building Official's review of whether the application meets local, state and federal health and safety requirements. The application shall be administratively reviewed by the Building Official as a nondiscretionary permit.

B. The City shall not condition approval of an application on the approval of an association, as that term is defined by Civil Code Section 4080.

C. An application for an electric vehicle charging station shall be deemed complete and the permit available for issuance, when the Building Official determines that the application satisfies all the requirements found in the checklist.

D. If an application is deemed incomplete, a written plan-check correction notice will be available to the applicant. It will detail all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance. It shall be given to the applicant for resubmission.

E. The Building Official may require an applicant to apply for a use permit if the Building Official finds in writing, based on substantial evidence, that the electric vehicle charging station would have a specific, adverse impact upon the public health or safety. The Building Official's decision to require a use permit 227
Ordinance No. 1792 Page 5
may be appealed by the applicant to the Planning Commission. The appeal shall be filed within fifteen (15) calendar days of the Building Official's decision.

F. If a use permit is required, the application for the use permit may be denied if the Planning Commission makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. Such findings shall include the basis for the rejection of potential feasible alternatives for preventing the specific, adverse impact. Such decisions may be appealed to the City Council pursuant to Government Code Section 65850.5.

SECTION 4. SCMC Section 15.08.020(H)(8), relating to expediting electric vehicle charging station projects, shall be eliminated and is hereby deleted in its entirety.

SECTION 5. If any section, sentence, clause, phrase, or portion of this ordinance is for any reason held to be invalid or unenforceable by a court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares it would have adopted this Ordinance, and each section, subsection, subdivision, sentence, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases thereof be declared invalid or unconstitutional.

SECTION 6. The mayor shall sign this ordinance The City Clerk shall certify to the adoption of this ordinance and cause it, or a summary thereof, to be published once within fifteen (15) days of adoption in a newspaper of general circulation printed and published within the City of San Clemente, and shall post a certified copy of this ordinance, including the vote for and against the same, in the Office of the City Clerk in accordance with California Government Code Section 36933. and thirty (30) days thereafter it shall take effect and be in force.

APPROVED AND ADOPTED this _____ day of June, 2025.

ATTEST:
_______________________________ ___________________________ City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California 228
Ordinance No. 1792 Page 6

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, hereby certify that Ordinance No. 1792 having been regularly introduced at the meeting of _______________________, was again introduced, the reading in full thereof unanimously waived, and duly passed and adopted at a regular meeting of the City Council held on the _____day of _____________, _______, and said ordinance was adopted by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of ______________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
APPROVED AS TO FORM:
_______________________________
Elizabeth A. Mitchell, CITY ATTORNEY
229
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11F.

Submitted By: City Clerk
Prepared By: Laura Campagnolo, City Clerk
Subject:
..titl e

RESOLUTION SETTING COMPENSATION FOR ALL CITY COMMISSIONS AND COMMITTEES AND REPEALING RESOLUTION NOS. 99-56, 23-75 AND 23-88 ..body
Fiscal Impact:

The Annual compensation for each Commission and Committee member has been approved through the formal budget process: Arts and Culture Committee ($2,310) Beaches, Parks and Recreation Commission ($2,970), Community Safety and Welfare Committee ($2,310), Design Review Subcommittee ($3,960), Golf Course Committee ($1,100), Investment Advisory Committee ($880), Planning Commission ($18,480).

Summary:

In the past several months, the City Council has made changes to the composition of various City Commissions and Committees. As a result of those changes, an updated Resolution has been prepared to formalize Commission and Committee compensation, removing Committees that no longer exist, and adding the newly formed Community Safety and Welfare Committee.

Below is a breakdown of compensation for each City Commission and Committee:
 Arts and Culture Committee $55.00 per meeting, not to exceed $55.00 per month.  Beaches, Parks and Recreation Commission $55.00 per meeting, not to exceed $110.00 per month.
 Community Safety and Welfare Committee $55.00 per meeting, not to exceed $55.00 per month.
 Design Review Subcommittee $55.00 per meeting, not to exceed $110.00 per month.  Golf Course Committee $55.00 per meeting, not to exceed $55.00 per month.  Investment Advisory Committee $55.00 per meeting, not to exceed $55.00 per month.  Planning Commission $110.00 for each regular, adjourned or Special Meeting attended, not to exceed $220.00 per month.

With the formal adoption of Resolution No. --, Resolution Nos. 99-56, 23-75 and 23-88 would be repealed.

Council Options:
 Adopt Resolution No. 25-76
 Direct Staff to return with additional information.
230
Meeting Date: June 3, 2025 Agenda Item: 11F.

CITY OF SAN CLEMENTE 2
 Take no action.

Environmental Review/Analysis:

This is not a project under the California Environmental Quality Act (CEQA).

Recommended Actions:

Staff Recommendation ..recommendation
Adopt Resolution No. 25-76 entitled A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, RELATING TO COMPENSATION PAID TO MEMBERS OF THE

ARTS AND CULTURE COMMITTEE, BEACHES, PARKS AND RECREATION COMMISSION,

COMMUNITY SAFETY AND WELFARE COMMITTEE, DESIGN REVIEW SUBCOMMITTEE,

GOLF COURSE COMMITTEE, INVESTMENT ADVISORY COMMITTEE AND PLANNING COMMISSION AND REPEALING RESOLUTION NOS. 99-56, 23-75 AND 23-88. ..end
Attachment:

1. Resolution No. 25-76
Notification:

City Commissions and Committees.
231
Attachment 1
RESOLUTION NO. 25-76

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, RELATING TO

COMPENSATION PAID TO MEMBERS OF THE ARTS AND

CULTURE COMMITTEE, BEACHES, PARKS AND

RECREATION COMMISSION, COMMUNITY SAFETY AND

WELFARE COMMITTEE, DESIGN REVIEW

SUBCOMMITTEE, GOLF COURSE COMMITTEE,

INVESTMENT ADVISORY COMMITTEE AND PLANNING
COMMISSION AND REPEALING RESOLUTION NOS. 99-56,
23-75 AND 23-88
WHEREAS, the City of San Clemente has six Commissions and Committees which are appointed by the City Council and a Design Review Subcommittee made up of four members of the Planning Commission (3 active members and one alternate); WHEREAS, each Commission, Committee and Design Review Subcommittee member receives compensation for their attendance at meetings.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:

SECTION 1. Resolution numbers 99-56, 23-75, and 23-88 are hereby repealed.

SECTION 2. Each member of the Arts and Culture Committee shall receive compensation in the amount of $55.00 per meeting, not to exceed $55.00 per month.

SECTION 3. Each member of the Beaches, Parks and Recreation Commission shall receive compensation in the amount of $55.00 per meeting, not to exceed $110.00 per month.

SECTION 4. Each member of the Community Safety and Welfare Committee shall receive compensation in the amount of $55.00 per meeting, not to exceed $55.00 per month.

SECTION 5. Each member of the Design Review Subcommittee shall receive compensation in the amount of $55.00 per meeting, not to exceed $110.00 per month.

SECTION 6. Each member of the Golf Course Committee shall receive compensation in the amount of $55.00 per meeting, not to exceed $55.00 per month.

SECTION 7. Each member of the Investment Advisory Committee shall receive compensation in the amount of $55.00 per meeting, not to exceed $55.00 per month.

SECTION 8. Each member of the Planning Commission shall receive compensation in the amount of $110.00 for each meeting, not to exceed $220.00 per month.

SECTION 9. The compensation for the newly formed Community Safety and 232
Resolution No. 25-76 Page 2
Welfare Committee shall become effective at the commencement of the first meeting of the Community Safety and Welfare Committee. This Resolution is subject to all present and future applicable wage control laws and regulations, and shall become effective only to the extent permitted by such laws and regulations.

SECTION 10. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of ____________________, _______.

ATTEST:
___________________________ __________________________
City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California 233
Resolution No. 25-76 Page 3

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-76 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of _______________________, _________, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
234
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11G.

Submitted By: City Clerk
Prepared By: Laura Campagnolo, City Clerk
Subject:
..titl e
..body

RECORDS DESTRUCTION
Fiscal Impact:

None.

Summary:

Staff is requesting authorization to destroy certain City records that have surpassed the City’s established retention requirements.

Background:

In accordance with State law, the City of San Clemente previously established a Records Retention Schedule that is consistent with State statutory requirements. Staff has determined that the records identified in the attached draft resolution have surpassed the City’s established retention requirements. Moreover, the City Attorney has determined that none of the records are needed for legal or operational purposes. Consequently, Staff is recommending that the City Council authorize the destruction of the City records identified in the proposed resolution. Subject to limited exceptions, a resolution adopted by City Council and the written consent of the City Attorney is required pursuant to Government Code section 34090 before records can be destroyed.

Council Options:
 Adopt Resolution No. 25-77.
 Amend and adopt the Resolution No. 25-77.
 Direct staff to provide additional information and return to the City Council.  Take no action.

Environmental Review/Analysis:

Not a “project” under the California Environmental Quality Act (CEQA).

Recommended Actions:

Staff Recommendation
STAFF RECOMMENDS THAT the City Council adopt Resolution No. 25-77 entitled “A RESOLUTION

OF THE CITY COUNCIL OF THE CITY OF SAN CLEMENTE, CALIFORNIA, AUTHORIZING 235
Meeting Date: June 3, 2025 Agenda Item: 11G.

CITY OF SAN CLEMENTE 2
THE DESTRUCTION OF CERTAIN CITY RECORDS AS PROVIDED BY SECTION 34090 OF THE GOVERNMENT CODE OF THE STATE OF CALIFORNIA.”
..recommendation
..end
Attachment:

1. Resolution No. 25-77 with Exhibit A, B, C and D
Notification:

None
236
Attachment 1
RESOLUTION NO. 25-77

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, AUTHORIZING THE

DESTRUCTION OF CERTAIN CITY RECORDS AS
PROVIDED BY SECTION 34090 OF THE GOVERNMENT
CODE OF THE STATE OF CALIFORNIA.

WHEREAS, maintaining certain records is unnecessary after a certain period of time for the effective and efficient operation of the government of the City of San Clemente; and WHEREAS, Section 34090 of the Government Code of the State of California provides a procedure whereby a City record that has served its purpose and is no longer required may be destroyed.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:

SECTION 1. The records of the City of San Clemente as set forth in Exhibits A, B, C and D attached hereto and incorporated herein by this reference are hereby authorized to be destroyed as provided by Section 34090 of the Government Code of the State of California.

SECTION 2. The provisions of Section 1 above do not authorize the destruction of:
(a) Records affecting the title to real property or liens thereon. (b) Court Records.
(c) Records required to be kept by statute.
(d) Records less than two (2) years old.
(e) The minutes, ordinances, or resolutions of the City Council of the City of San Clemente or of any City Committee or Commission.

SECTION 3. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.
237
Resolution No. 25-77 Page 2
PASSED AND ADOPTED this _____ day of ____________________, _______.

ATTEST:
___________________________ __________________________
City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-77 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of _______________________, _________, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
238
FILE

CITY OF SAN CLEMENTE

RECORDS DESTRUCTION REQUEST
DEPARTMENT: Beaches, Parks and Recreation

DESCRIPTION DATE RETENTION

RANGE SCHEDULE
Winter Registration 2019 2019 '
2017 Scholarship; Winter Registration 2019 2017;2019 '
SCAC Sign In 2016-2017 2016-2017
Summer 2019 Registration Receipts 2018
Pool Sign In 2018; Spring Registration 2019 2018;2019
2018 Petty Cash, 2019 Rentals, 2019 Swim 2018;2019
Sign In
Registration Fall 2018 2018
2015; 2017 Pool Sign In 2015;2017
Soring 2018 Registration 2018
Summer 2019 Registration 2019
2019 Reservations; 2020 Registrations, Pool 2019,2020
Waivers
2018 Rental Contracts; 2019 Pool Sign In; Fall 2018; 20� 2018 Registration Forms; Lawn Bowling
Waiver; Military Grant
2017 SCAC Invoices for Payment 2017
Buildings Conditions of Facility Reports, Daily 2014-2018 2015-2018; Events 2015-2017; Employee
Timesheets 2014-2015; Recreation Receipts
2015-2016
2018 Scholarships; Fall 2019 Registration 2018;2019
Forms
2019 Pool Sign In 2019
2021 Withdrawals/Refunds 2021
2020 Pool Waivers, Pool Reservations; 2019 2019;2020
Scholarships
Soring/Summer 2020 Registration; Golf 2020
Summer 2022 Registration A-L 2022
Summer 2022 Registration M-Z 2022
2021 Winter Registration; Pool Sign In 2021
2021 Winter Registration; Pool Sign In 2021
Oct-Dec 2021 Pool Sign In 2021
2018-2022 Facility Reports/Daily Checklists; 2018-2022 2019-2022 Sign In/Out; 2017-2022 RFP; 2018- 2022 Compliance/Damage Deposit
DATE

DESTROY

EXHIBIT A
239
240
241

EXHIBIT B
242
243

EXHIBIT C
244
245

EXHIBIT D
246
247
248
249
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11H.

Submitted By: Beaches, Parks and Recreation
Prepared By: Samantha Wylie, Beaches, Parks & Recreation Director Subject:
..titl e
NOTICE OF COMPLETION – REPLACEMENT OF PLAYGROUND SUBSTRATE SURFACING AT SAN GORGONIO PARK, CIP PROJECT NO. 11148 ..body
Fiscal Impact:

The total cost of the project, including contingency, was $151,655 and is funded through the Park Asset Replacement Reserve ($130,000) and a donation from the Friends of San Clemente Beaches, Parks & Recreation Foundation ($21,655). No additional appropriation is necessary.

Summary:

The contractor, Robertson Industries, Inc., has satisfactorily completed all work in accordance with the project specifications. Final inspection was conducted by City staff on May 19, 2025, and all punch list items were addressed.

The new surfacing enhances safety, improves ADA accessibility, and contributes to the overall aesthetic of San Gorgonio Park. The improvements support the City’s goals of maintaining highquality recreational amenities for all residents.

Background:

On January 14, 2025, the City Council awarded a contract to Robertson Industries, Inc. in the amount of $144,595 for the installation of improved playground safety surfacing. The project scope included removal of existing materials, preparation of the subgrade, and installation of new impact-attenuating pour-in-place rubberized playground surfacing compliant with current CPSC and ADA standards.

A summary of the total construction expenditures is provided below:

Site Work - Irrigation Wells $7,060
Construction and Management $144,595
Total Project Cost $151,655
250
Meeting Date: June 3, 2025 Agenda Item: 11H.

CITY OF SAN CLEMENTE 2
Figure 1. Before replacement (engineered wood fiber) Figure 2. After replacement (PIP rubber surface) Figure 3. After replacement (PIP rubber surface) Figure 4. After replacement (PIP rubber surface) Council Options:
 Adopt Resolution No. 25-78, which would accept the completed replacement of the playground substrate surfacing at San Gorgonio Park, PN 11148.  Adopt Resolution No. 25-78 with modifications.
 Continue the item with direction to provide additional information.

Environmental Review/Analysis:

This project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 2 (Replacement or Reconstruction, 14 CCR section 15302) of the State CEQA Guidelines.

Recommended Actions:

Staff Recommendation ..recommendation
Adopt Resolution No. 25-78, which will:

1. Accept the replacement of the playground surfacing at San Gorgonio Park, PN 11148, from the contractor, Robertson Industries, Inc.; and
251
Meeting Date: June 3, 2025 Agenda Item: 11H.

CITY OF SAN CLEMENTE 3

2. Authorize the City Clerk to execute and record the Notice of Completion for the playground surfacing replacement at San Gorgonio Park; and

3. Authorize the City Clerk to release the Payment Bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the contractor, Robertson Industries, Inc.; and

4. Authorize the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.
..end
Attachment:

1. Resolution No. 25-78

2. Notice of Completion – Playground Surfacing Replacement at San Gorgonio Park, PN 11148 Notification:

None.
252
Attachment 1
RESOLUTION NO. 25-78

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, ACCEPTING THE

COMPLETED WORK FOR THE PLAYGROUND SUBSTRATE

SURFACING PROJECT AT SAN GORGONIO PARK,
PROJECT NO. 11148, AND DIRECTING THE CITY CLERK

TO FILE A NOTICE OF COMPLETION
WHEREAS, the City previously determined the project to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 2 (Replacement or Reconstruction, 14 CCR section 15302) of the State CEQA Guidelines and awarded a contract to Robertson Industries, Inc. for the Playground Substrate Surfacing Replacement Project at San Gorgonio Park, CIP Project No. 11148; and WHEREAS, the scope of work included the removal and replacement of playground surfacing to improve safety, accessibility, and compliance with relevant standards; and WHEREAS, City staff conducted a final inspection on May 19, 2025, and determined that the work has been satisfactorily completed; and WHEREAS, the contractor has completed all work in accordance with the approved plans and specifications to the satisfaction of the Public Works Director/City Engineer.

NOW, THEREFORE, The City Council of the City of San Clemente does hereby resolve as follows:

SECTION 1. The above recitations are true and correct and incorporated fully herein.

SECTION 2. That the City Council accepts as complete the San Gorgonio Park Playground Substrate Surface Replacement and the City Council authorizes the City Clerk to execute and record a Notice of Completion for CIP Project No. 11148.

SECTION 3. That the City Council authorizes the City Clerk to release the payment bond for this project 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against Robertson Industries, Inc.

SECTION 4. That the City Council authorizes the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.

SECTION 5. The City Clerk shall certify to the passage and adoption of this resolution 253
Resolution No. 25-78 Page 2
and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of ____________________, _______.

ATTEST:
___________________________ __________________________
City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-78 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of _______________________, _________, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
254
Attachment 2
Recording Requested By:

City of San Clemente
When Recorded, Mail To:

City Clerk
City of San Clemente
910 Calle Negocio
San Clemente, CA 92673
Recorded for the benefit of the City of San
Clemente and exempt from recording fees
pursuant to Government Code Section 27383.

Space above this line is for Recorder’s Use Only

NOTICE OF COMPLETION
Notice is hereby given by the City of San Clemente, a Municipal Corporation, that a public work of improvement has been completed as follows:

1. Project title or description of work: Playground Surfacing Replacement at San Gorgonio Park, Project No. 11148; the scope included removal of the existing surfacing material and replacement with a rubberized surfacing.

2. Street address or legal description of the project site: 2916 Via San Gorgonio, San Clemente, CA 92672; Parcels: 691-211-04; TR 5879 LOT A AND TR 4938 LOTS B & C & POR LOT A AND POR E1/2 SEC 30 T 8 R 7

3. Date of Completion: May 16, 2025

4. Name of owner: City of San Clemente.

5. Interest or estate of owner: Public facility.

6. Address of owner: 910 Calle Negocio, San Clemente, CA 92673

7. Name and address of contractor: Robertson Industries, Inc., 2140 East Cedar Street, Tempe, AZ 85281
I am the City Clerk for the City of San Clemente, a Municipal Corporation, the owner of the indicated interest or estate in the property described above. I make this verification on behalf of the City of San Clemente. I have read this Notice of Completion and know its contents. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Executed on __________________________ in San Clemente, California. _________________________________
Laura Campagnolo, City Clerk
City of San Clemente
255
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11I.

Submitted By: Public Works
Prepared By: Belgin Cuhadaroglu, Senior Civil Engineer
Subject:
..titl e

CONSIDERATION OF A RESOLUTION REJECTING ALL BIDS FOR THE CAMINO VERA CRUZ RECYCLED WATER LINE EXTENSION, CIP PROJECT NO. 17407 ..body Fiscal Impact:

If bids are rejected as proposed, there is no fiscal impact with the exception of the nominal costs of modifying and reissuing the bid documents based on a revised scope of work.

Summary:

Before the City Council is consideration of adopting Resolution 25-79 which will reject all bids for the Camino Vera Cruz Recycled Water Line Extension Project. This will allow staff to re-scope the bid package and re-bid the project with a scope of work that will better address the potential conflicts with underground utilities.

Background:

Recycled water customers account for approximately 15% of the City's overall water demand and utilize approximately 1,200-acre feet per year of recycled water. The City's customer use of recycled water reduces the City's need for imported potable water from the Metropolitan Water District of Southern California (Metropolitan). Upon completion of the recycled water expansion in 2014, there was one area within Forster Ranch that provided approximately 10.5-acre feet of water use near an existing recycled water line. City staff coordinated with the homeowner association and determined the best location to install new meters for conversion of the private irrigation system to recycled water. Approximately 402 linear feet of pipes and irrigation meters will be installed to provide additional recycled water, as shown below. 256
Meeting Date: June 3, 2025 Agenda Item: 11I.

CITY OF SAN CLEMENTE 2
Staff prepared a bid package,
notified local contractors, and
advertised the project for
competitive bidding on the
PlanetBids website and in the
San Clemente Times. On May 5,
2025, the City received five bids,
ranging from $267,050 to
$583,971, as shown on the table
below.

Company Name Company Location
Bid
Amount
Diamond Construction & Design San Clemente, CA $267,050 Cem Construction Corporation Montebello, CA $317,620
G&A Nelos Construction, Inc.. Lake Elsinore, CA $504,667 Ferreira Construction Co, Inc. Rancho Cucamonga, CA $550,000 T.E. Roberts, Inc. Irvine, CA $583,971
Subsequent to the bid opening on May 5, 2024, SDG&E stated that existing EUG (Energy Usage Guidelines) service is in conflict with the proposed 4” recycled water line improvement and fire improvements plans, and that certain vertical and horizontal separation must be maintained.

Therefore, City staff recommends rejecting all bids, revising the project plans accordingly, and rebidding the project.

Council Options:
 Adopt Resolution No. 25-79, rejecting all bids.
 Modify and adopt Resolution No. 25-79.
 Continue the item with direction to provide additional information.  Do not adopt Resolution No. 25-79 and put the project on hold.

Environmental Review/Analysis:

Rejecting bids is not a “project” under the California Environmental Quality Act (CEQA). The original project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Section 15303 of the state CEQA Guidelines, Class 3 (New Construction or Conversion of Small Structures), 14 CCR Section 15303). 257
Meeting Date: June 3, 2025 Agenda Item: 11I.

CITY OF SAN CLEMENTE 3
Recommended Actions:

Staff recommends that the City Council adopt Resolution No. 25-79, which will:
..recommendation

1. Reject all bids received on May 5, 2025, for the Camino Vera Cruz Recycled Water Line Extension, CIP Project No. 17407, pursuant to Section 20166 of the Public Contract Code; and

2. Authorize staff to re-scope the bid package and re-bid the Camino Vera Cruz Recycled Water Line Extension, CIP Project No. 17407, with a revised project scope. ..end
Attachment:

1. Resolution No. 25-79
Notification:

All bidders.
258
Attachment 1
4882-9904-3949 v1
RESOLUTION NO. 25-79

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, REJECTING ALL BIDS

FOR THE CAMINO VERA CRUZ RECYCLED WATER LINE
EXTENSION, CIP PROJECT NO. 17407
WHEREAS, recycled water customers account for approximately 15% of the City's overall water demand and utilize approximately 1,200-acre feet per year of recycled water; and
WHEREAS, the City's customer use of recycled water reduces the City's need for potable imported water from the Metropolitan Water District of Southern California; and WHEREAS, extension of an existing recycled water line will provide recycled water to three meters for an annual demand of approximately 10.5 acre feet of recycled water and this area was previously identified as a high water use; and WHEREAS, due to high demand adjacent to an existing recycled water line in Camino Vera Cruz within Forster Ranch, approximately 402 linear feet of recycled water pipe lines and three irrigation meters will be installed; and WHEREAS, staff prepared a bid package for the Camino Vera Cruz Recycled Water Line Extension, notified local contractors, and advertised the project for competitive bidding on the PlanetBids website and in the SC Times; and WHEREAS, on May 5, 2025, the City received five (5) bids ranging from $267,050 to $583,971 for the Project; and
WHEREAS, subsequent to the bid opening on May 5, 2024, potential conflicts with underground utilities have need identified, and need to be addressed.

WHEREAS, rejecting all bids, revising the project plans, re-bidding the Project is in the best interest of the City and the public.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby find, determine and resolve as follows:

SECTION 1. That the above recitations are true and correct and incorporated fully herein.

SECTION 2. That all bids received on May 5, 2025 for the Camino Vera Cruz Recycled Water Line Extension, CIP Project No. 17407, are hereby rejected.

SECTION 3. That staff is authorized and directed to re-scope the bid package and re-bid the Camino Vera Cruz Recycled Water Line Extension, CIP Project No. 17407 with a revised scope of work.
259
Resolution No. 25-79 Page 2
4882-9904-3949 v1
SECTION 4. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of ____________________, 2025.

ATTEST:
___________________________ __________________________
City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-79 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of _______________________, _________, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
260
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11J.

Submitted By: Public Works
Prepared By: César Chamorro, Assistant Engineer
Subject:
..titl e

CONSIDERATION OF A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO ADV RELINE INC. FOR THE REHABILITATION OF TWO (2) 6” A.C.P. DOMESTIC WATER LINES AS PART OF EL LEVANTE PRESSURE REDUCING STATION REHABILITATION, CIP PROJECT NO. 15409, IN AN AMOUNT NOT TO EXCEED $74,596, AUTHORIZING THE CITY MANAGER TO EXECUTE THE

CONSTRUCTION CONTRACT, AND FINDING THE PROJECT CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT ..body
Fiscal Impact:

The estimated total construction cost of $91,176 is within the approved available budget of $346,000 from the Water Fund Depreciation Reserve, Account No. 052-466-45300-000-15409, El Levante PRS Rehabilitation.

Summary:

Before the City Council is the award of a construction contract to ADV Reline, Inc, in an amount not to exceed $74,596, for the rehabilitation of 6” asbestos cement pipes (A.C.P) for domestic water distribution.

Background:

The El Levante Pressure Reducing Station (PRS) vault has deteriorated and is near the end of its useful life. Critical components of the system have become obsolete and need to be replaced and/or repaired. To accomplish this, the station needs to be shut down and to maintain water services to residents served by this station, water will have to be rerouted through two existing 6” A.C.P domestic water line pipes. These two 6” A.C.P domestic water lines in easement areas that are currently out of service and need to be relined to maintain water service while El Levante PRS is undergoing the needed repairs. The location of El Levante PRS and the two existing 6” A.C.P pipes are shown below.

Pursuant to City’s “Procurement
Policies and Procedures”, Provision
VII.B.3., utilizing California Uniform
Public Construction Cost Accounting
Act (CUPCCAA) procedures for
informal bidding; on March 21, 2025,
staff send Request for Proposals to
contractors interested in this project,
including two local contractors. Two Bid
proposals were received on April 8,
2025. The bid results are presented in
261
Meeting Date: June 3, 2025 Agenda Item: 11J.

CITY OF SAN CLEMENTE 2
Table 1 below. No local contractors provided a bid.

The lowest responsive and responsible bidder is ADV Reline, Inc., from Temecula, California, with a bid of $74,596.

Table 1 - Bid Summary
Company Name Company Location Bid Amount
ADV Reline, Inc. Temecula, CA $ 74,596
Insituform Huntington Beach, CA $206,980
Based on the lowest bid, the total estimated project construction cost is $95,769, as summarized below in Table 2.

Table 2 - Cost Summary
Construction Management and Inspection $ 7,000
Construction $74,596
Potential Project Overages (10%) $ 9,580
Total Estimated Construction Cost $91,176
As required by state law and City Policy, ADV Reline, Inc. will be required to provide performance and payment bonds simultaneously with the execution of the construction contract (Attachment 2). Project drawings and specifications are in City Clerk’s Office.

Council Options:
 Adopt Resolution No. 25-80 (Attachment 1), awarding the Construction Contract to ADV Reline, Inc., authorizing the City Manager to execute a construction contract in an amount not to exceed $74,596, and finding the project categorically exempt from CEQA under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines.  Modify and adopt Resolution 25-80
 Continue the item and direct staff to provide additional information.  Do not award the contract or have the existing 6” A.C. Pipes Domestic Water Lines not rehabilitated.

Environmental Review/Analysis:

This project is exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines) because it consists of repairs to existing City facilities, involves negligible or no expansion of existing or former use, and has no possibility of a direct or reasonably foreseeable indirect effect on the environment. 262
Meeting Date: June 3, 2025 Agenda Item: 11J.

CITY OF SAN CLEMENTE 3
Recommended Actions:

Staff recommends that the City Council adopt Resolution No 25-80, which will:

1. Find the Rehabilitation of 6” A.C.P. Domestic Water Lines, CIP Project No. 15409, categorically exempt from CEQA under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines;

2. Award the Rehabilitation of 6” A.C.P. Domestic Water Lines, CIP Project No. 15409 construction contract to ADV Reline, Inc.; and

3. Authorize the City Manager to execute a contract with ADV Reline, Inc. in an amount not to exceed $74,596, in a form substantially similar to Contract No. 25-29 (Attachment 2), for the Rehabilitation of 6” A.C.P. Domestic Water Lines, CIP Project No. 15409.

4. Authorize the City Manager or designee to approve total project overages not to exceed 10 percent of the construction costs.
..end
Attachment:

1. Resolution No. 25-80

2. Contract No. 25-29 (without attachments)
Notification:

All bidders.
..recommendation
..end
263
Attachment 1
RESOLUTION NO. 25-80

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, AWARDING A

CONSTRUCTION CONTRACT TO ADVANTAGE RELINE,
DBA ADV RELINE INC. FOR THE REHABILITATION OF
TWO (2) 6” A.C.P. DOMESTIC WATER LINES AS PART OF

EL LEVANTE PRESSURE REDUCING STATION
REHABILITATION, CIP PROJECT NO. 15409;

AUTHORIZING THE CITY MANAGER TO EXECUTE THE
CONTRACT IN AN AMOUNT NOT TO EXCEED $74,596;

AND FINDING THE PROJECT CATEGORICALLY EXEMPT

FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
(CEQA) UNDER CLASS 1 (EXISTING FACILITIES, 14 CCR
SECTION 15301) OF THE STATE CEQA GUIDELINES
WHEREAS, pursuant to City’s “Procurement Policies and Procedures”, Provision VII.B.3., utilizing California Uniform Public Construction Cost Accounting Act (CUPCCAA) procedures for informal bidding, City conducted informal bidding for the Rehabilitation of two (2) 6” Asbestos Cement Pipe (A.C.P.) Domestic Water Lines, CIP Project No. 15409 (Project); and
WHEREAS, on April 8, 2025, the City received two (2) responsive bids ranging from $74,596 to $206,980 for the Project; and
WHEREAS, ADV Reline, Inc. was the lowest responsive and responsible bidder with a bid of $74,596.

NOW, THEREFORE, the City Council of the City of San Clemente does hereby find, determine and resolve as follows:

SECTION 1. That the above recitations are true and correct and incorporated herein.

SECTION 2. That the Project is categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines because it consists of repairs to existing City facilities, involves negligible or no expansion of existing or former use and there is no possibility of a direct or reasonably foreseeable indirect effect on the environment.

SECTION 3. That the Construction Contract Agreement for Rehabilitation of two (2) 6” Asbestos Cement Pipe Domestic Water Lines, CIP Project No. 15409, is hereby awarded to ADV Reline, Inc.

SECTION 4. That the City Manager is authorized and directed to execute a construction contract for the Rehabilitation of two (2) 6” Asbestos Cement Pipe Domestic Water Lines, CIP Project No. 24304 with ADV Reline, Inc. in an amount not to exceed $74,596, in a form substantially similar to that presented to City Council on May 20, 2025. 264
Resolution No. 25-80 Page 2
SECTION 5. That the City Manager or designee is authorized to approve total project overages not to exceed 10 percent of the construction costs.

SECTION 6. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this _____ day of _________, 2025.

ATTEST:
___________________________ __________________________
City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-80 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of ________, 2025, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of ________, ____. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
265
55452.01510\32977834.2
Attachment 2

CITY OF SAN CLEMENTE

CONSTRUCTION CONTRACT
REHABILITATION OF 6” A.C.P. DOMESTIC WATER LINES, P.N. 15409

1. PARTIES AND DATE.

This Contract is made and entered into this ____ day of _______, 2025 by and between the City of San Clemente, a public agency of the State of California (“City”) and ADV Reline, Inc., a California corporation with its principal place of business at 2 Betterworld Cir 200 Temecula, CA 92590 (“Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.

2. RECITALS.

2.1 City. City is a public agency organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose.

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain construction services required by the City on the terms and conditions set forth in this Contract. Contractor represents that it is duly licensed and experienced in providing Rehabilitation by Lining Domestic Water Pipe Lines related construction services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of City. The following license classifications are required for this Project: California Contractor’s License, Class “A”.

2.3 Project. City desires to engage Contractor to render such services for the REHABILITATION OF 6” A.C.P. DOMESTIC WATER LINES, P.N. 15409, (“Project”) as set forth in this Contract.

2.4 Project Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, a performance bond, a payment bond, and all insurance documentation, as required by the Contract.

3. TERMS

3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
 Services/Schedule (Exhibit “A”)
 Plans and Specifications (Exhibit “B”)
 Special Conditions (Exhibit “C”)
 Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”)  Public Works Contractor Registration Certification (Exhibit “E”)  Payment and Performance Bonds (Exhibit “F”)
 Federal Requirements (Exhibit “G”)
 Insurance Requirements (Exhibit “H)
 Addenda
266
55452.01510\32977834.2
2  Change Orders executed by the City
 2024 Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-8
 Notice Inviting Bids, if any
 Instructions to Bidders, if any
 Contractor’s Bid

3.2 Contractor’s Basic Obligation; Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter sometimes referred to as the “Work”), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit “B” attached hereto and incorporated herein by this reference. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in writing by a valid change order executed by the City. Should Contractor request a change order due to unforeseen circumstances affecting the performance of the Work, such request shall be made within five (5) business days of the date such circumstances are discovered or shall waive its right to request a change order due to such circumstances. If the Parties cannot agree on any change in price required by such change in the Work, the City may direct the Contractor to proceed with the performance of the change on a time and materials basis.

3.2.2 Substitutions/“Or Equal”. Pursuant to Public Contract Code Section 3400(b), the City may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.”
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the City may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article.

The burden of proof as to the equality of any material, process or article shall rest with Contractor.

The City has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted. Data required to 267
55452.01510\32977834.2
3 substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the City’s costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

3.3 Period of Performance.

3.3.1 Contract Time. Contractor shall perform and complete all Work under this Contract within thirty (30) working days, beginning the effective date of the Notice to Proceed (“Contract Time”). Contractor shall perform its Work in strict accordance with any completion schedule, construction schedule or project milestones developed by the City. Such schedules or milestones may be included as part of Exhibits “A” or “B” attached hereto, or may be provided separately in writing to Contractor. Contractor agrees that if such Work is not completed within the aforementioned Contract Time and/or pursuant to any such completion schedule, construction schedule or project milestones developed pursuant to provisions of the Contract, it is understood, acknowledged and agreed that the City will suffer damage.

3.3.2 Force Majeure. Neither City nor Contractor shall be considered in default of this Contract for delays in performance caused by circumstances beyond the reasonable control of the non-performing party. For purposes of this Contract, such circumstances include but are not limited to, abnormal weather conditions; floods; earthquakes; fire; pandemics or epidemics; war; riots and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage or judicial restraint. Should such circumstances occur, the nonperforming party shall, within a reasonable time of being prevented from performing, give written notice to the other party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Contract. Contractor’s exclusive remedy in the event of delay covered under this section shall be a non-compensable extension of the Contract Time.

3.3.3 Liquidated Damages. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages the sum of One Thousand Dollars ($1,000) per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule or Project milestones established pursuant to the Contract.

3.4 Standard of Performance; Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall 268
55452.01510\32977834.2
4 have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including any required business license, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the City to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the City, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.

3.5 Control and Payment of Subordinates; Contractual Relationship. City retains Contractor on an independent contractor basis and Contractor is not an employee of City. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

3.6 City’s Basic Obligation. City agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the belowreferenced compensation in accordance with compensation provisions set forth in the Contract.

3.7 Compensation and Payment.

3.7.1 Amount of Compensation. As consideration for performance of the Work required herein, which includes everything that is reasonably foreseeable related thereto, City agrees to pay Contractor the Total Contract Price of Seventy-Four Thousand, Five Hundred and Ninety-Six Dollars ($74,596.00) (“Total Contract Price”) provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Contract or written change orders approved and signed in advance by the City.

3.7.2 Payment of Compensation. If the Work is scheduled for completion in thirty (30) or less calendar days, City will arrange for payment of the Total Contract Price upon completion and approval by City of the Work. If the Work is scheduled for completion in more than thirty (30) calendar days, City will pay Contractor on a monthly basis as provided for herein.

On or before the fifth (5th) day of each month, Contractor shall submit to the City an itemized application for payment in the format supplied by the City indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Contract and such other documentation as the City may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. Contractor may be required to furnish a detailed schedule of values upon request of the City and in such detail and form as the City shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments. 269
55452.01510\32977834.2
5 3.7.3 Prompt Payment. City shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others.

3.7.4 Contract Retentions. From each approved progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder will be paid to Contractor. All Contract retention shall be released and paid to Contractor and subcontractors pursuant to California Public Contract Code Section 7107.

3.7.5 Other Retentions. In addition to Contract retentions, the City may deduct from each progress payment an amount necessary to protect City from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the City in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by City during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Contract; and (11) any other sums which the City is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City’s right to such sums.

3.7.6 Substitutions for Contract Retentions. In accordance with California Public Contract Code Section 22300, the City will permit the substitution of securities for any monies withheld by the City to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City, or with a state or federally chartered bank in California as the escrow agent, and thereafter the City shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the City has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the City.

3.7.7 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the City at the time of payment. To the extent that title has not previously been vested in the City by reason of payments, full title shall pass to the City at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the City, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items. 270
55452.01510\32977834.2
6 3.7.8 Labor and Material Releases. Contractor shall furnish City with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by City.

3.7.9 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract upon request. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at Contractor’s principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

3.7.10 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3.7.11 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

3.7.12 Payroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty to City, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as 271
55452.01510\32977834.2
7 determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on Contractor.

The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.7.13 Contractor and Subcontractor Registration. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

3.7.14 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City.

Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.8 Performance of Work; Jobsite Obligations.

3.8.1 Water Quality Management and Compliance.

3.8.1.1 Water Quality Management and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or surface water in the State.

3.8.1.2 Compliance with the Statewide Construction General Permit. Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity which results in the disturbance of more than one 272
55452.01510\32977834.2
8 acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor’s sole responsibility to update the SWPPP as necessary to address conditions at the project site.

3.8.1.3 Other Water Quality Rules Regulations and Policies.

Contractor shall comply with the lawful requirements of any applicable municipality, drainage City, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

3.8.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during construction of The Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

3.8.1.5 Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the City and its officials, officers, employees, volunteers and agents for any alleged violations. In addition, City may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor’s failure to comply with the Permit.

3.8.1.6 Reservation of Right to Defend. City reserves the right to defend any enforcement action brought against the City for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the City for the costs (including the City’s attorney’s fees) associated with, any settlement reached between the City and the relevant enforcement entity.

3.8.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.8.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in paragraph 3.8.1 as they may relate to the Work provided under this Agreement. Upon request, City will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

3.8.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state 273
55452.01510\32977834.2
9 and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.8.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the City in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the public contracts of a municipality are a part of this Contract to the same extent as though set forth herein and will be complied with. Contractor shall defend, indemnify and hold City, its officials, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.8.4 Permits and Licenses. Contractor shall be responsible for securing City permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. While Contractor will not be charged a fee for any City permits, Contractor shall pay the City’s business license fee, if any. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.8.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for City’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.8.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify City of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II 274
55452.01510\32977834.2
10 or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall promptly investigate the conditions to determine whether a change order is appropriate.

In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.8.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, City shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the construction drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of City to provide for removal or relocation of such utility facilities.

3.8.8 Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by CARB to include any item of equipment with a fuel-powered engine. Contractor shall indemnify City against any fines or penalties imposed by CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Agreement.

3.8.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify City in writing and shall furnish all labor and material releases required by this Contract. City shall thereupon inspect the Work. If the Work is not acceptable to the City, the City shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a reinspection by the City. Once the Work is acceptable to City, City shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which City may be authorized or directed by law to retain.

Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.10 Claims; Government Code Claim Compliance.

3.10.1 Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes. 275
55452.01510\32977834.2
11 3.10.2 Claims. For purposes of this Section, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with the terms of this Contract has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City. A “Claim” does not include any demand for payment for which the Contractor has failed to provide notice, request a change order, or otherwise failed to follow any procedures contained in the Contract Documents. Claims governed by this Section may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and Contractor’s request for a change has been denied in whole or in part. Claims governed by this Section must be filed no later than fourteen (14) days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing in this Section is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra Work, disputed Work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

3.10.3 Supporting Documentation. The Contractor shall submit all claims in the following format:

3.10.3.1 Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made

3.10.3.2 List of documents relating to claim:
(A) Specifications
(B) Drawings
(C) Clarifications (Requests for Information)
(D) Schedules
(E) Other

3.10.3.3 Chronology of events and correspondence

3.10.3.4 Analysis of claim merit

3.10.3.5 Analysis of claim cost

3.10.3.6 Time impact analysis in CPM format

3.10.3.7 If Contractor’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the Project, Contractor shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions. 276
55452.01510\32977834.2
12 3.10.3.8 Cover letter and certification of validity of the claim, including any claims from subcontractors of any tier, in accordance with Government Code section 12650 et seq.

3.10.4 City’s Response. Upon receipt of a claim pursuant to this Section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement.

3.10.4.1 If City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, City shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.

3.10.4.2 Within 30 days of receipt of a claim, City may request in writing additional documentation supporting the claim or relating to defenses or claims City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor.

3.10.4.3 City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

3.10.5 Meet and Confer. If the Contractor disputes City’s written response, or City fails to respond within the time prescribed, the Contractor may so notify City, in writing, either within 15 days of receipt of City’s response or within 15 days of City’s failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, City shall schedule a meet and confer conference within 30 days for settlement of the dispute.

3.10.6 Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after City issues its written statement. Any disputed portion of the claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with City and the Contractor sharing the associated costs equally. City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.

3.10.6.1 If the Parties cannot agree upon a mediator, each Party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each Party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. 277
55452.01510\32977834.2
13 3.10.6.2 For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the Parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

3.10.6.3 Unless otherwise agreed to by City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

3.10.6.4 The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.

3.10.7 Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation.

3.10.8 Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this Section:

3.10.8.1 Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

3.10.8.2 If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.

3.10.8.3 In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

3.10.9 Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, claims and/or changed conditions, Contractor must comply with the claim procedures set forth in Government Code sections 900 et seq. prior to filing any lawsuit against the City. Such 278
55452.01510\32977834.2
14 Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if any prerequisite contractual requirements are not otherwise satisfied as specified herein, Contractor shall be barred from bringing and maintaining a valid lawsuit against the City. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.

3.10.10 Non-Waiver. City’s failure to respond to a claim from the Contractor within the time periods described in this Section or to otherwise meet the time requirements of this Section shall result in the claim being deemed rejected in its entirety. City’s failure to respond shall not waive City’s rights to any subsequent procedures for the resolution of disputed claims.

3.11 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by City. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City may terminate this Contract pursuant to Section 3.17.3; provided, however, that the City needs to provide Contractor with only one (1) day advanced written notice.

3.12 Indemnification.

3.12.1 Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend (with counsel reasonably approved by City), indemnify and hold the City, its officials, employees, agents and authorized volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor’s services, the Project or this Agreement, including without limitation the payment of all consequential damages, expert witness fees and attorneys’ fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City’s agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons.

3.12.2 Additional Indemnity Obligations. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding. Contractor shall also reimburse City for the cost of any settlement paid by City or its officials, employees, agents and authorized volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City's attorney's fees and costs, including expert witness fees. Contractor shall reimburse City and its officials, employees, agents and authorized volunteers, for any and all legal expenses and costs incurred by each of them in 279
55452.01510\32977834.2
15 connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and authorized volunteers.

3.13 Insurance. Contractor agrees to procure and maintain, at Contractor’s expense all insurance specified in Exhibit “H” attached hereto and by this reference incorporated herein.

Contractor shall require all subcontractors to carry the same policies and limits of insurance that the Contractor is required to maintain, unless otherwise approved in writing by the City.

3.14 Bond Requirements.

3.14.1 Payment Bond. If required by law or otherwise specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.14.2 Performance Bond. If specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.14.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the Contract for cause.

3.14.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.15 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty 280
55452.01510\32977834.2
16 at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work.

Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense.

Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

3.15.1 Warranty Bonds. At the time of completion of the project and prior to acceptance, a warranty bond in the amount of 25% of the contract price shall be required for a period of one (1) year after City recordation of Notice of Completion.

3.16 Employee/Labor Certifications.

3.16.1 Contractor’s Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contract as Exhibit “D” and incorporated herein by reference, shall be executed simultaneously with this Contract.

3.16.2 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.16.3 Verification of Employment Eligibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same.

3.17 General Provisions.
281
55452.01510\32977834.2
17 3.17.1 City’s Representative. The City hereby designates the General Manager, or his or her designee, to act as its representative for the performance of this Contract (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.17.2 Contractor’s Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the City (“′Contractor’s Representative”). Following approval by the City, Contractor’s Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor’s Representative shall supervise and direct the Work, using his best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract. Contractor’s Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the City, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the City, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor’s Representative, Contractor shall provide the information specified above and obtain the City’s written approval.

3.17.3 Termination. This Contract may be terminated by City at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by City for any reason other than the fault of Contractor, City shall pay Contractor for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, City may terminate the Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset City’s resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, City may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract.

3.17.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from City, the matter shall be referred to City’s Representative, whose decision shall be binding upon Contractor.

3.17.5 Anti-Trust Claims. This provision shall be operative if this Contract is applicable to California Public Contract Code Section 7103.5. In entering into this Contract to supply goods, services or materials, Contractor hereby offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time the City tender final payment to Contractor, without further acknowledgment by the Parties.

3.17.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be provided by the mailing 282
55452.01510\32977834.2
18 thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows:

CONTRACTOR: Adv Reline, Inc.
2 Betterworld Cir 200
Temecula, CA 92590
Attn: Stephan Asay, Chief Executive Officer.

CITY: City of San Clemente
910 Calle Negocio
San Clemente, CA 92673
Attn: Laura Campagnolo, City Clerk and Shawn Ryan, Deputy Public Works Director
Any notice so given shall be considered received by the other Party three (3) days after deposit in the U.S. Mail as stated above and addressed to the Party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.17.7 Time of Essence. Time is of the essence in the performance of this Contract.

3.17.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of City. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, City may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee.

3.17.9 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.17.10 Laws, Venue, and Attorneys’ Fees. This Agreement shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or federal court situated in the County of Orange, State of California.

3.17.11 Counterparts/Electronic Signature. This Contract may be executed in counterparts, each of which shall constitute an original. This Contract may be executed electronically with the same force and effect as an original ink signature. Bonds, if required, must be signed with original ink signatures and accompanied by notary acknowledgments.

3.17.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

3.17.13 [Reserved]

3.17.14 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely 283
55452.01510\32977834.2
19 for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to terminate this Contract without liability.

3.17.15 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Contract, no official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Work.

3.17.16 Certification of License.

3.17.16.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor’s license of the classification indicated below under Contractor’s signature.

3.17.16.2 Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O.

Box 26000, Sacramento, California 95826.

3.17.17 Authority to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.17.18 Entire Contract; Modification. This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.17.19 Non-Waiver. None of the provisions of this Agreement shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.17.20 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project or other projects. [SIGNATURES ON NEXT PAGE]
284
55452.01510\32977834.2
20 IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be duly executed on the respective dates set forth opposite of their signatures.

CITY OF SAN CLEMENTE
By:____________________________
Andy Hall, City Manager
ATTEST: Dated: _______________________
_____________________________
CITY CLERK of the City of
San Clemente, California
APPROVED AS TO FORM:
_____________________________
Elizabeth A. Mitchell, City Attorney

APPROVED AS TO AVAILABILITY
OF FUNDING:
_____________________________
Finance Authorization

ADV Reline, Inc., a California
corporation (“Contractor”)

By:_____________________________
Stephen Asay, Chief Executive Officer
Dated: _________________________

By:_____________________________
Troy Juve, Secretary
Dated: _________________________
285
55452.01510\32977834.2
21 EXHIBIT “A”

SERVICES / SCHEDULE
The Contractor shall perform the following services, including providing all labor, equipment and materials (collectively, the “Services”) under this Agreement to the City’s satisfaction and according to the schedule provided by the City:

Rehabilitation of 500’ of 6" ACP Domestic Water Lines with 6-inch Primus Liner generally located in easements dedicated to the City as shown on Maps of Tract 3729, Book 5465, Page 566 and Book 1156, Page 308, of Official Records, and Tract 898, Book 735, Page 449 of Official Records, as indicated by the City, including:

1. Mobilization of Crew & Equipment, including providing trained team to access confined spaces as needed.

2. Cleaning & Hydrojetting of pipe in preparation for Primus installation.

3. Pre Installation Video of pipe.

4. Install Primus Liner, Low Pressure, 6 inch pipe, 500 feet. No resin, or volatile organic compounds involved in the installation. Use a Hanzen-Williams C Factor of 150 and NSF 61 approved materials.

5. Install Primus Fittings, Low Pressure, 6 inch, Qty 4.

6. Freight FOB San Clemente.

7. Transport Reel / Packaging / Respooling.

8. Domestic Shipping.

9. Performance & Payment Bonds.

10. Contractor guarantees that the labor and materials shall be free from material defects for a period of five years from the date of completion of the work. Prior to the release of the performance and payment bonds, the Contractor shall provide a warranty bond in a form acceptable to the City.
286
55452.01510\32977834.2
- 22 -
EXHIBIT “B”

PLANS AND SPECIFICATIONS
287
55452.01510\32977834.2
- 23 -
EXHIBIT “C”

SPECIAL CONDITIONS
ARTICLE 1. BONDS
As soon as possible and, in any event, no later than ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the City four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the City and included as Exhibit “F” to the Contract. Failure to do so may, in the sole discretion of City, result in the forfeiture of Contractor’s bid security. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price. 288
55452.01510\32977834.2
- 24 -
EXHIBIT “D”

WORKERS COMPENSATION INSURANCE CERTIFICATION

WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
(ONE OF THE BOXES BELOW MUST BE CHECKED)
I have and will maintain a certificate of consent from the California Labor Commission to self-insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract.

I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract. My workers' compensation insurance carrier and policy number are:

Carrier____________________________________________________ Policy Number______________________________________________ I certify that, in the performance of the work under this Agreement, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and I hereby agree to indemnify, defend, and hold harmless the City of San Clemente and all of its officials, employees, and agents from and against any and all claims, liabilities, and losses relating to personal injury or death, economic losses, and property damage arising out of my failure to provide such worker’s compensation insurance. I further agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.

WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION COVERAGE IS UNLAWFUL,

AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.

Dated: _______________________________
ADV Reline, Inc.

By: ________________________________
Signature
________________________________
Name and Title
______________________________________________________
Address
289
55452.01510\32977834.2
- 25 -
EXHIBIT “E”

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/PublicWorks/PublicWorks.html for additional information.

No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.

Name of Contractor:

DIR Registration Number:

DIR Registration Expiration:_________________________
Small Project Exemption: _____ Yes or _____ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:
 Contractor shall maintain a current DIR registration for the duration of the project.  Contractor shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.  Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Contractor
Signature
Name and Title
Dated______________________________________________________ 1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”
290
55452.01510\32977834.2
- 26 -
EXHIBIT “F”

PAYMENT AND PERFORMANCE BONDS
291
55452.01510\32977834.2
- 27 -

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of San Clemente (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
292
55452.01510\32977834.2
- 28 -
(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By
Title
293
55452.01510\32977834.2
- 29 -
(Corporate Seal) Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
294
55452.01510\32977834.2
- 30 -
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
295
55452.01510\32977834.2
- 31 -

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of San Clemente (hereinafter designated as the “City”), by action taken or a resolution passed ___________ , 20____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or 296
55452.01510\32977834.2
- 32 -
subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal) Surety
By
Attorney-in-Fact
Title
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
297
55452.01510\32977834.2
- 33 -
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
298
55452.01510\32977834.2
- 34 -
EXHIBIT “G”

FEDERAL REQUIREMENTS

NOT APPLICABLE
299
55452.01510\32977834.2
- 35 -
EXHIBIT “H”

INSURANCE REQUIREMENTS

3.13 Insurance.

3.13.1 Time for Compliance. Contractor shall not commence work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract as required in section 1.1.12 of this agreement.

3.13.2 Types of Insurance Required. As a condition precedent to the effectiveness of this Contract for work to be performed hereunder, and without limiting the indemnity provisions of the Contract, the Contractor, in partial performance of its obligations under such Contract, shall procure and maintain in full force and effect during the term of the Contract the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Contractor agrees to amend, supplement or endorse the policies to do so. (A) Commercial General Liability: Commercial General Liability Insurance which affords coverage at least as broad as Insurance Services Office "occurrence" form CG 0001, or the exact equivalent, and shall be no less than $1,000,000 per occurrence and no less than $2,000,000 in the general aggregate. Defense costs shall be paid in addition to the limits.

The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; or (3) contain any other exclusion contrary to the Contract.
(B) Automobile Liability Insurance: Automobile Liability Insurance with coverage at least as broad as Insurance Services Office Form CA 0001 covering "Any Auto" (Symbol 1), or the exact equivalent, covering bodily injury and property damage for all activities shall be in an amount of not less than $1,000,000 combined limit for each occurrence. (C) Workers' Compensation: Workers' Compensation Insurance, as required by the State of California and Employer's Liability Insurance with a limit of not less than $1,000,000 per accident for bodily injury and disease.

3.13.3 Endorsements. Required insurance policies shall contain the following provisions, or Contractor shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Commercial General Liability
(1) Additional Insured: The City, its officials, officers, employees, agents, and volunteers shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Contract.

Additional Insured Endorsements shall not (1) be restricted to "ongoing operations"; (2) exclude "contractual liability"; (3) restrict coverage to "sole" liability of Contractor; or (4) contain any other exclusions contrary to the terms of purposes of this Contract.

For all policies of Commercial General Liability insurance, Contractor shall provide endorsements 300
55452.01510\32977834.2
- 36 -
in the form of ISO CG 20 10 10 01 and 20 37 10 01 (or endorsements providing the exact same coverage) to effectuate this requirement.
(2) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (B) Automobile Liability:
(1) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (C) Workers' Compensation:
(1) Waiver of Subrogation: A waiver of subrogation stating that the insurer waives all rights of subrogation against the City, its officials, officers, employees, agents and volunteers
(2) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium.

3.13.4 Primary and Non-Contributing Insurance. All policies of Commercial General Liability, Automobile Liability insurance (if required) shall be primary and any other insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees agents or volunteers shall not contribute with this primary insurance. Policies shall contain or be endorsed to contain such provisions.

3.13.5 Waiver of Subrogation. All policies of Commercial General Liability, Automobile Liability insurance (if required) shall contain or be endorsed to waive subrogation against the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors.

3.13.6 Deductibles and Self-Insured Retentions. Any deductible or self-insured retention in excess of $5,000 must be approved in writing by the City and shall protect the City, its officials, officers, employees, agents and volunteers in the same manner and to the same extent as they would have been protected had the policy or policies not contained a deductible or self-insured retention.

3.13.7 Evidence of Insurance. The Contractor, concurrently with the execution of the Contract, and as a condition precedent to the effectiveness thereof, shall deliver either certified copies of the required policies, or original certificates on forms approved by the City, together with all endorsements affecting each policy. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for approval. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15 days) prior 301
55452.01510\32977834.2
- 37 -
to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced, and not replaced immediately so as to avoid a lapse in the required coverage, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies.

3.13.8 Failure to Maintain Coverage. In the event any policy of insurance required under this Contract does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Contractor or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Contract, effective upon notice.

3.13.9 Acceptability of Insurers. Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A- VII and authorized to transact business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.

3.13.10 Enforcement of Contract Provisions (non estoppel). Contractor acknowledges and agrees that actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligation on the City nor does it waive any rights hereunder.

3.13.11 Requirements Not Limiting. Requirement of specific coverage or minimum limits contained in this Appendix are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance.

3.13.12 Insurance for Subcontractors. Contractor shall include all Subcontractors as additional insureds under the Contractor's policies, or the Contractor shall be responsible for causing Subcontractors to purchase the appropriate insurance in compliance with the terms of these Insurance Requirements, including adding the City, its officials, officers, employees, agents and volunteers as additional insureds to the Subcontractor's policies. All policies of Commercial General Liability insurance provided by Subcontractors shall be endorsed to name the City, its officials, officers, employees, agents and volunteers as additional insureds using endorsement form ISO CG 20 38 04 13. Contractor shall not allow any Subcontractor to commence work until it has received satisfactory evidence of Subcontractor’s compliance with all insurance requirements under this Contract, to the extent applicable. The Contractor shall provide satisfactory evidence of compliance with this section upon request of the City. 302
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11K.

Submitted By: City Manager
Prepared By: Leslea Meyerhoff, Coastal Administrator
Subject:
..titl e

OFFSHORE SAND SOURCE INVESTIGATION BUDGET INCREASE, CONSIDERATION OF

ENTERING INTO AN AGREEMENT WITH THE ORANGE COUNTY TRANSPORTATION

AUTHORITY AND SUBSEQUENTLY AMENDING THE PROFESSIONAL SERVICES AGREEMENT WITH COAST ..body AL FRONTIERS
Fiscal Impact:

The Orange County Transportation Authority (“OCTA”) is providing $180,000 in funding which will be added to the Coastal Frontiers contract for the City of San Clemente Offshore Borrow Site Investigation. If executed by both the City and OCTA, the City will receive the funds in accordance with the agreement (Attachment 1). If the agreement is executed, the current contract with Coastal Frontiers (Attachment 2) will be amended accordingly. These funds will be used to supplement the City’s $800,000 grant from the Coastal Commission to locate offshore sand sources closer to the City. There is no direct fiscal impact to the general fund with this action.

Summary:

The City Council is being asked to consider an agreement with the OCTA to receive supplemental funding in the amount of $180,000 which will be added to the City’s existing contract with Coastal Frontiers. The supplemental funding will be specifically used to enable additional time on the water conducting the geologic sampling field work portion of the offshore sand source investigation. The purpose of the effort is to identify one or more potential new sand borrow sites offshore that can be used for purposes of beach restoration in the City of San Clemente.

The California State Lands Commission (CSLC) is scheduled to consider issuance of a geologic sampling permit for the offshore sand source investigation at a hearing held on June 3rd. If the City Council approves authorizes execution of the agreement with OCTA and the resulting amendment to the contract with Coastal Frontiers, the City will need to seek an amendment to the CSLC approval to support an expanded exploration plan. Staff will work expeditiously to obtain approval for an expanded exploration plan if this item is approved by the City Council. The geologic sampling effort is currently intended to be implemented as early as August 2025 and is subject to a 10-day weather window with calm seas to optimize the geologic sampling effort and minimize any downtime or weather-related delays and related costs.

A draft report will be prepared summarizing the findings of the geologic sampling effort and staff will report back to the Council as soon as the report is complete. Per the terms of the grant, all work must be completed in the current calendar year.
303
Meeting Date: June 3, 2025 Agenda Item: 11K.

CITY OF SAN CLEMENTE 2
Background:

In November 2023, the City began a 50-year partnership with the U.S. Army Corps of Engineers (USACE) to bring sand to the City’s beaches. The original sand source was identified in an area offshore of the Santa Margarita River (near the Oceanside Harbor). The site did not yield sufficient quantities of beach quality sand so a second borrow site had to be identified. In February 2024, the City and USACE identified and permitted a second borrow site located off the coast of northern Orange County. The location of the sand deposits was located further from the receiving beach (T Street to Linda Lane) than the first borrow site resulting in a cost increase for the delivery of sand to the City. The project was completed in late 2024 using sand from the Surfside Sunset borrow site.

Staff initiated an investigation into other local sources of sand and submitted a grant application to the Coastal Commission to fund an offshore sand search. The grant was awarded and the City retained a team of experts in 2024 to locate beach quality sand resources closer to the City.

Aware that the OCTA also needs a sand source for their projects in the City, staff reached out to OCTA to invite them to be a financial partner in the City’s offshore sand source investigation.

Discussion:

Given the additional budget from OCTA and the number of potential sites to be explored offshore, it is currently anticipated that up to 8 potential sites can be explored. The consultant team will be doing (1) a strategic screening level investigation of the closest sites and (2) will conduct a focused sampling effort for the most promising site(s). The City’s goals are to find two offshore sand sources to support beach sand replenishment planned as part of the USACE project, OCTA project and SANDAG RBSP III Project.

If the results of the offshore sand source investigation are positive, and high-quality sand deposits are found closer to San Clemente in sufficient volume to sustain beach nourishment, City staff will expeditiously move forward with permitting the new borrow site(s) in 2026 so that the sand could be used for beach nourishment in San Clemente. Staff will report back in the future as the study progresses.

Council Options:
 Adopt Resolution No. 25-81.
 Modify and adopt Resolution No. 25-81.
 Provide alternate direction to staff.

Environmental Review/Analysis:

Entering into an agreement with OCTA and amending a professional services agreement are not a project as defined by the California Environmental Quality Act (CEQA).

Recommended Actions:

Staff Recommendation ..recommendation
Staff Recommends that the City Council:
304
Meeting Date: June 3, 2025 Agenda Item: 11K.

CITY OF SAN CLEMENTE 3

1. Adopt Resolution No. 25-81 titled: “A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SAN CLEMENTE, CALIFORNIA, AUTHORIZING THE EXECUTION OF A

PROFESSIONAL SERVICES AGREEMENT TO CONDUCT AN OFFSHORE SAND SOURCE INVESTIGATION”

2. Approve, and authorize the City Manager to execute, Contract No. C25-30, by and between the City of San Clemente and the Orange County Transportation Authority, providing for additional funding for the offshore sand source investigation, in the amount of $180,000 in a form substantially similar to attachment 1.

3. Approve, and authorize the City Manager to execute, Amendment No. 1 to Contract No. C24- 61, by and between the City of San Clemente and Coastal Frontiers, providing for additional funding for the offshore sand source investigation to allow for additional sand site exploration studies for the Coastal Rail Stabilization Priority Project, the total compensation shall not exceed $976,266.
..end
Attachment:

1. Orange County Transportation Authority (OCTA) and City Agreement

2. Coastal Frontiers Corporation Contract Amendment No. 1

3. Resolution 25-81
Notification:

None.
305
Attachment 1
306
307
308
309
310
311
312
313
314
315
316
317
318

FIRST AMENDMENT TO

PROFESSIONAL CONSULTANT SERVICES AGREEMENT
This First Amendment to the Professional Services Agreement (the “First Amendment”) is made and entered into on this __ of June, 2025 by and between the CITY OF SAN CLEMENTE, a municipal corporation, organized under the laws of the State of California, with its principal place of business at 910 Calle Negocio, San Clemente, California, 92673 (“City”), and Coastal Frontiers Corporation, a California corporation, with its principal place of business at 882 A Patriot Drive, Moorpark California, 93021 (“Consultant”). City and Consultant are sometimes individually referred to herein as “Party” and collectively as “Parties”.

RECITALS
Whereas, on October 15, 2024, the City and the Consultant entered into that certain Professional Consultant Services Agreement (Contract No. C24-61) (“the Agreement”) for the Consultant to render professional offshore sand source investigation services for the City’s Local Coastal Program; and
Whereas, the Orange County Transportation Authority (“OCTA”) is providing the City with $180,000 in supplemental funding to increase the offshore borrow site investigation scope of work under the Agreement as set forth in that certain Cooperative Agreement No. C-5-4116 Between Orange County Transportation Authority And City Of San Clemente For Additional Sand Site Exploration Studies For The Coastal Rail Stabilization Priority Project (“Coop Agreement”); and
Whereas, the Coop Agreement provides that the additional $180,000 in supplement funding from OCTA is to be used to collect additional technical data to find one or more offshore sand sources that can be used to support beach sand replenishment efforts in San Clemente with certain limitations as set forth in the Coop Agreement; and Whereas, the Parties hereto desire to enter this First Amendment to amend the Agreement and, on the terms, and conditions stated herein.

NOW THEREFORE, for good and valuable consideration, the receipt of which is hereby confirmed, the Parties hereto agree as follows:

COVENANTS
SECTION 1: Section 3.3.1 (Compensation) of the Agreement is hereby amended to state that the total compensation shall not exceed Nine Hundred Seventy-Six Two Hundred Sixty-Six Dollars ($976,266.00).
319
SECTION 2: Exhibit A (Scope of Services) to the Agreement and is hereby amended to state that the additional $180,000 in supplement funding from OCTA shall only be used in consultation with and at the direction of the City for sampling consistent with the requirements on the Coop Agreement, which is fully incorporated into the Agreement by reference.

SECTION 3: Except as expressly amended by this First Amendment, the Agreement and all its provisions shall remain in full force and effect.

IN WITNESS WHEREOF, the Parties hereto have caused this First Amendment to be duly executed on the respective dates set forth opposite of their signatures.

CITY OF SAN CLEMENTE
By:________________________________
Andy Hall, City Manager
Dated: __________________
ATTEST:
_______________________
CITY CLERK of the City of
San Clemente, California
APPROVED AS TO FORM:
_____________________________
Elizabeth A. Mitchell, City Attorney
Coastal Frontiers Corp., a California
corporation (“CONSULTANT”)
By:_____________________________
Gregory E. Hearon, CEO/CFO
Dated: ___________________
By:_____________________________
Craig B. Leidersdorf, VP
Dated: ___________________
320
Attachment 3
RESOLUTION NO. 25-81

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE, CALIFORNIA, APPROVING AN

AGREEMENT WITH THE ORANGE COUNTY

TRANSPORTATION AUTHORITY AND SUBSEQUENTLY

AMENDING THE PROFESSIONAL SERVICES

AGREEMENT WITH COASTAL FRONTIERS FOR THE

OFFSHORE BORROW SITE INVESTIGATION
..body
WHEREAS, coastal erosion is a very significant problem in the City of San Clemente that threatens the public beaches and coastal public access, key public facilities, existing structures including the OCTA rail line and other critical public infrastructure; and
WHEREAS, the City has begun actively implementing a comprehensive, citywide coastal resiliency building strategy using beach sand replenishment and sand retention as the primary means of restoring the sandy beach shoreline in the City; and WHEREAS, based on emergency conditions on City beaches where there is no dry sand at high tide, and public beaches, existing structures and critical public infrastructure including the railroad is exposed to direct wave attack, runup, overtopping and as well as undermining; and
WHEREAS, in 2024 the City was awarded, an $800,000 grant from the Coastal Commission to conduct an offshore borrow site investigation to identify new sand sources that could be used to sustain a long term and comprehensive sand replenishment program in the City; and
WHEREAS, the City retained a team of coastal experts led by Coastal Frontiers Corporation in October 2024 to conduct the offshore sand source investigation, which is currently underway, and is expected to be complete in calendar year 2025; and WHEREAS, OCTA desires to provide supplemental funding in the amount of $180,000 to be used to support additional field work and vibracore-based geologic sampling as part of the City’s offshore sand source investigation; and WHEREAS, the supplemental funding from OCTA will be added to the total contract cost resulting in a need for Amendment No. 1 to the Coastal Frontiers Contract (C24-61); and
WHEREAS, the City desires to develop additional sand sources as close to the City of San Clemente as possible to sustain a long term and comprehensive beach sand replenishment program;
WHEREAS, entering into an agreement with OCTA to receive supplemental 321
Resolution No. 25-81 Page 2
4890-6752-0111 v4
funding for the offshore sand source investigation will support extra days on the ocean increasing the potential for funding beach quality sand deposits close/closer to San Clemente; and
WHEREAS, an amendment to the Coastal Frontiers contract is warranted due to the increased budget available for the sand offshore sand source investigation.

NOW THEREFORE, the City Council of the City of San Clemente, California, does hereby find, determine, and resolve as follows:

1. That the foregoing recitations are true, correct, and incorporated herein.

2. That the City Manager is hereby authorized and directed to execute, Contract No. C25-30, by and between the City of San Clemente and the Orange County Transportation Authority, providing for additional funding for the offshore sand source investigation, in the amount of $180,000 in a form substantially similar to that presented to the City Council on June 3, 2025.

3. That the City Manager is hereby authorized and directed to execute, Amendment No. 1 to Contract No. C24-61, by and between the City of San Clemente and Coastal Frontiers, providing for additional funding for the offshore sand source investigation to allow for additional sand site exploration studies for the Coastal Rail Stabilization Priority Project, total compensation not exceed $976,266 and in a form substantially similar to that presented to the City Council on June 3, 2025.

4. That City staff is hereby authorized and directed to take such actions as are necessary or proper to fulfill the purpose and intent of this Resolution and/or proceed with the Study.

5. That the City Clerk shall certify the passage and adoption of this Resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED this 3rd day of June, 2025.

ATTEST:
___________________________ __________________________
City Clerk of the City of Steve Knoblock, Mayor of the City San Clemente, California of San Clemente, California
322
Resolution No. 25-81 Page 3
4890-6752-0111 v4

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-81 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of _______________________, _________, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. __________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
323
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11L.

Submitted By: Public Works
Prepared By: Fatana Temory, Management Analyst
Zak Ponsen, Assistant City Engineer
Subject:
..titl e
CONSIDERATION OF A RESOLUTION TO DESIGNATE FISCAL YEAR (FY) 2025-2026 STREET REHABILITATION PROJECTS PURSUANT TO SENATE BILL 1 (SB 1) THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
..body
Fiscal Impact:

The proposed resolution allocates SB 1 gas tax funds to the planned projects proposed in the FY 2025-26 Capital Improvement Program. It is estimated that the City will receive approximately $1,736,127 in SB 1 gas tax funds in FY 2025-26.

Summary:

The proposed resolution designates the following new projects to receive SB 1 gas tax funds:
 Ave. De La Estrella Sidewalk Improvements
 Ave. Pico Widening/Bike Lanes
 Calle Pueblo Sidewalk Improvements
 Del Mar Street Rehabilitation Project
This resolution is required by SB 1 funding requirements.

Background:

In April 2017, the Governor signed SB 1 titled “The Road Repair and Accountability Act of 2017”, which provides funding to cities and counties for basic road maintenance, rehabilitation, and critical safety projects on the local streets and roads system. SB 1 increases per gallon fuel excise taxes, diesel fuel sales taxes and vehicle registration taxes, and provides inflationary adjustments to fuel tax rates in future years. Collected tax revenue is deposited into a new Road Maintenance and Rehabilitation Account (RMRA), and some of this new RMRA funding is apportioned by formula to eligible cities and counties. It is estimated that San Clemente will receive approximately $1,736,127 in RMRA funding in FY 2025-26. This revenue estimate has been incorporated into the proposed FY 2025-26 budget.

SB 1 includes increased transparency and reporting requirements, including a requirement that projects proposed for SB 1 funding must be designated by resolution. The proposed FY 2024-25 CIP includes RMRA funding for the proposed projects listed in the resolution. Projects that have not been completed from previous years are required to be included in the FY 2024-25 resolution.

Projects will improve traffic signals, traffic signal controller cabinets and pedestals, and address 324
Meeting Date: June 3, 2025 Agenda Item: 11L.

CITY OF SAN CLEMENTE 2
public safety by creating accessible pedestrian routes in highly traveled areas where sidewalk does not exist. The attached resolution is required by the state to formally designate SB 1 gas tax funds to the project.

Council Options:
 Adopt Resolution No. 25-82 to designate FY 2025-2026 Street Rehabilitation Projects pursuant to Senate Bill 1 (SB 1), The Road Repair and Accountability Act of 2017.  Modify and adopt Resolution No. 25-82 to designate FY 2025-2026 Street Rehabilitation Projects pursuant to Senate Bill 1 (SB 1), The Road Repair and Accountability Act of 2017.  Continue the Item and direct staff to provide additional information.

Environmental Review/Analysis:

Staff recommends that the City Council determine this project to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR Section 15301), and Class 2 (Replacement or Reconstruction, 14 CCR section 15302) of the State CEQA Guidelines.

Recommended Actions:

Staff Recommendation
..recommendation
Staff recommends that the City Council adopt Resolution No. 25-82 entitled “A Resolution of the City Council of the City of San Clemente Adopting a List of Projects for Fiscal Year 2025-2026 Funded by Senate Bill 1 (SB 1): The Road Repair and Accountability Act of 2017 and Finding the Projects Categorically Exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR Section 15301), and Class 2 (Replacement or Reconstruction, 14 CCR section 15302) of the State CEQA Guidelines.”
..end
Attachment:

1. Resolution No. 25-82
Notification:

None.
325
Attachment 1
RESOLUTION NO. 25-82

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE ADOPTING A LIST OF PROJECTS FOR
FISCAL YEAR 2025-2026 FUNDED BY SENATE BILL 1 (SB
1): THE ROAD REPAIR AND ACCOUNTABILITY ACT OF
2017 AND FINDING THE PROJECTS CATEGORICALLY

EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT (CEQA) UNDER CLASS 1 (EXISTING
FACILITIES, 14 CCR SECTION 15301), AND CLASS 2
(REPLACEMENT OR RECONSTRUCTION, 14 CCR
SECTION 15302) OF THE STATE CEQA GUIDELINES
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of San Clemente must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of San Clemente, will receive an estimated $1,736,127 in RMRA funding in Fiscal Year 2025-26 from SB 1; and
WHEREAS, this is the ninth year in which the City of San Clemente is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City of San Clemente has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and 326
Resolution No. 25-82 Page 2
WHEREAS, the City of San Clemente used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities’ priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City of San Clemente maintain and rehabilitate arterial streets/roads and sidewalks throughout the City of San Clemente this year and into the future; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City of San Clemente’s streets and roads are in an overall good condition and this revenue will help us increase the overall good quality of the road system and over the next decade; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.

NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council of the City of San Clemente, State of California, as follows:

SECTION 1. Incorporation of Recitals.

The City Council hereby finds that all of the facts in the Recitals above are true and correct and are incorporated and adopted as fully set forth in this resolution.

SECTION 2. CEQA Findings.

Based upon its review of the entire records, including the Staff Report, any public comments or testimony presented to the City Council, the City Council herby finds and determines that the proposed projects are categorically exempt from CEQA pursuant to State CEQA Guidelines Section 15301(h) (Class1: Existing Facilities) and Section 15302 (Class 2: Replacement or Reconstruction).

SECTION 3. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2025-26 Road Maintenance and Rehabilitation Account revenues:
327
Resolution No. 25-82 Page 3
Project Title: Ave. De La Estrella Sidewalk Improvements Project Description: To further enhance the walkability and safety of the area, construction of approximately 580 linear feet of concrete sidewalk, including curbs, gutters, ramps, and a pedestrian crossing area.

Project Location: Ave. De La Estrella between Redondel and El Portal Estimated Project Schedule: Start: July 2026 – Completion: June 2028 based on the component being funded with RMRA funds.

Estimated Project Useful Life: 20 Years
Project Title: Ave. Pico Widening/Bike Lanes
Project Description: Widen arterial street to include bike lanes in each direction.

Project Location: Ave. Pico between the I-5 Freeway and the Calle Frontera & Ave. Presidio intersection.

Estimated Project Schedule:

Design Start: April 2026 – Completion: April 2027. Construction Start: May 2027 – Completion June 2028 based on the component being funded with RMRA funds.

Estimated Project Useful Life: 20 Years
Project Title: Calle Pueblo Sidewalk Improvements
Project Description: Construction improvements for removal and replacement of sections of curb, gutter, and sidewalk where a new flow line will be installed to provide positive drainage and increase safety for pedestrian.

Project Location: Calle Pueblo at Calle Miguel
Estimated Project Schedule: Start: June 2026 – Completion: Oct. 2026 based on the component being funded with RMRA funds.

Estimated Project Useful Life: 20 Years
Project Title: Ave. Del Mar Street Rehabilitation Project Project Description: Resurface and restripe Ave. Del Mar with potential ADA pedestrian upgrades.

Project Location: Ave. Del Mar between El Camino Real and S. Calle Seville.

Estimated Project Schedule: Start: Jan. 2026 – Completion: Sept. 2026 based on the component being funded with RMRA funds.

Estimated Project Useful Life: 20 Years
SECTION 4. The following previously proposed and adopted projects may also utilize Fiscal Year 2025-26 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the 328
Resolution No. 25-82 Page 4
City of San Clemente is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:

Project Title: Traffic Signal Camera Replacement
Project Description: This project will replace damaged and/or deteriorated traffic signal cameras, as needed.

Project Location: El Camino Real, Ave. Del Mar, Ave. Pico, Ave. Vaquero, Ave.

Del Presente, Ave. Palizada, Ave. Vista Hermosa, Ave. Vera Cruz, Ave. Del Rio, Ave. La Pata, Calle Del Cerro, Calle Amanecer, Camino De Los Mares, Camino De Estrella, Calle Sarmentoso, Calle Saluda, Ave. Talega, Camino la Pedriza Estimated Project Schedule: Start: July 2025 – Completion: June 2026 based on the component being funded with RMRA funds.

Estimated Project Useful Life: 20 Years
Project Title: Calafia Complete Streets
Project Description: Design and construction of new bicycles and sidewalk improvements along Avenida Calafia from Ave. Del Presidente to the California State Parks parking lot.

Project Location: Avenida Calafia
Estimated Project Schedule:

Design Start: May 2025 – Completion: June 2026. Construction Start: June 2026 – Completion June 2027 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 Years
Project Title: El Camino Real and Palizada to Presidio Class 3 Bike Improvements
Project Description: Construction of new Class 3 shared bike lane improvements on El Camino Real from Ave. Pico to Calle Del Comercio, and from the east terminus of Ave. Palizada through Ave. Caballeros, El Oriente, Calle Empalme, Calle Miguel to Ave. Presidio.

Project Location: El Camino Real and Broadmore area south of San Clement High School.

Estimated Project Schedule: Start: Dec. 2024 – Completion: June 2024 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 Years
Project Title: Mira Costa Pedestrian Island
Project Description: Construction for new pedestrian island on Mira Costa at the Mira Costa Public Park.
329
Resolution No. 25-82 Page 5
Project Location: Mira Costa.

Estimated Project Schedule: Start: June. 2025 – Completion: June 2026 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 Years
Project Title: Traffic Signal Cabinet & Pedestals Replacement Project Description: This project will replace damaged and/or deteriorated traffic signal controller cabinets and pedestals, as needed.

Project Location: El Camino Real, Ave. Del Mar, Ave. Pico, Ave. Vaquero, Ave.

Del Presente, Ave. Palizada, Ave. Vista Hermosa, Ave. Vera Cruz, Ave. Del Rio, Ave. La Pata, Calle Del Cerro, Calle Amanecer, Camino De Los Mares, Camino De Estrella, Calle Sarmentoso, Calle Saluda, Ave. Talega, Camino la Pedriza Estimated Project Schedule: Start: July 2025 – Completion: June 2026 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 Years
Project Title: Signalized Intersection Improvements
Project Description: Improve all signalized intersections by adding yellow reflective blackplates to all traffic signal heads and upgrade and replace aging internally illuminated street name signs, as well as converting detection systems from cameras to loops at selected intersections to improve system performance.

Project Location: El Camino Real, Ave. Del Mar, Ave. Pico, Ave. Vaquero, Ave.

Del Presente, Ave. Palizada, Ave. Vista Hermosa, Ave. Vera Cruz, Ave. Del Rio, Ave. La Pata, Calle Del Cerro, Calle Amanecer, Camino De Los Mares, Camino De Estrella, Calle Sarmentoso, Calle Saluda, Ave. Talega, Camino la Pedriza Estimated Project Schedule: Start: July 2025– Completion: June 2026 based on the component being funded with RMRA funds
Estimated Project Useful Life: 20 Years
SECTION 5. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED AND ADOPTED by the City Council of the City of San Clemente, State of California this ____ day of June, 2025, by the following vote:

ATTEST:
_______________________________ _____________________________ City Clerk of the City of San Clemente, Steve Knoblock, Mayor of the California City of San Clemente, California
330
Resolution No. 25-82 Page 6

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-82 was adopted at a regular meeting of the City Council of the City of San Clemente held on ______ day of June 2025, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. ____________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
331
910 Calle Negocio
2nd Floor
San Clemente, California
www.san-clemente.org

AGENDA REPORT

CITY OF SAN CLEMENTE

CITY COUNCIL MEETING
CITY OF SAN CLEMENTE 1
Meeting Date: June 3, 2025 Agenda Item: 11M.

Submitted By: Public Works
Prepared By: Fatana Temory, Management Analyst
Zak Ponsen, Assistant City Engineer
Subject:
..titl e
CONSIDERATION OF A RESOLUTION FOR RENEWED MEASURE M2 ANNUAL FUNDING ELIGIBILITY – FISCAL YEAR 2025-2026 ..body
Fiscal Impact:

The recommended action will continue the City’s eligibility for receiving Measure M2 Local Fair Share allocations estimated at approximately $1.3 million for Fiscal Year 2025-2026 once all eligibility requirements are fulfilled.

Summary:

Before the City Council is the approval of the proposed 2025-2026 Measure M2 Seven-Year Capital Improvement Program and authorizing the Director of Public Works to submit the City of San Clemente’s Measure M2 eligibility submittals to the Orange County Transportation Authority (OCTA). The purpose of this action is to maintain eligibility for funding under the Orange County Renewed Measure M Programs. The yearly deadline for submittal of City Council Resolutions is July 1.

Background:

In November 1990, Orange County voters approved Measure M, a one-half percent sales tax increase for 20 years, to fund transportation projects in Orange County. Furthermore, in November 2006, the voters approved Renewal of Measure M (M2) for an additional thirty years, that became effective in April 2011. County-wide Measure M2 improvement projects include upgrading major freeway and rail transit system, maintaining streets and roads, synchronizing traffic signals countywide and implementing environmental cleanup program.

Discussion:

The renewed Measure M Ordinance requires local jurisdictions to annually submit specific documentation to the OCTA. Local jurisdictions must meet the following requirements to be eligible for fair share and competitive M2 funds:
 Adopt and update a seven-year Capital Improvement Program (CIP). The attached CIP list includes all capital transportation projects proposed from Fiscal Years 2025-2026 through 2031-2032. (Attachment 1).
 Adopt a General Plan Circulation Element consistent with the Master Plan of Arterial Highways (MPAH).
332
Meeting Date: June 3, 2025 Agenda Item: 11M.

CITY OF SAN CLEMENTE 2
 Submit a Pavement Management Plan (PMP) update biennially to OCTA. The updated PMP is attached to this report (Attachment 4).
 Adopt and provide an annual Expenditure Report to OCTA within six months of end of fiscal year (due by December 31, 2025).
 Adopt and maintain a Local Signal Synchronization Plan (LSSP) every three years.  Satisfy Maintenance of Effort (MOE) requirements.
 Agree to expend all Local Fair Share revenues received through Renewed Measure M within three years of receipt.
 Participate in traffic forum (City Staff has participated in various working group sessions hosted by OCTA).
 Establish a policy that requires new development to pay its fair share of transportation related improvements associated with their new development. The City’s Regional Circulation Financing & Phasing Program (RCFPP) fulfills this requirement.  Provide OCTA with a Project Final Report within six months following completion of a project funded with net revenues.
 Agree that Net Revenues shall not be used to supplant developer funding.  Consider, as part of eligible jurisdiction’s General Plan, land use and planning strategies that accommodate transit and non-motorized transportation. The General Plan update included policies and language that encourage and facilitate transit and non-motorized transportation options.
 Comply with the conditions and requirements of the Orange County Congestion Management Program (CMP). The City is required to comply with the County’s CMP such as traffic level of service (LOS).

Staff has prepared the necessary submittal documents to satisfy the requirements and demonstrate eligibility for receiving Measure M2 funds.

Council Options:
 Approve the M2 Seven-Year Capital Improvement Program and adopt the necessary resolutions for submittal of required documents to OCTA.  Modify and adopt the proposed resolutions.
333
Meeting Date: June 3, 2025 Agenda Item: 11M.

CITY OF SAN CLEMENTE 3
 Continue the Item and direct staff to provide additional information. Note: Any continued Item would need to be brought back to City Council and approved prior to July 1, 2025 or the City may lose its eligibility to receive Measure M2 funds.
 Deny some or all staff recommendations. This would result in the City losing its eligibility to receive Measure M2 funds.

Environmental Review/Analysis:

Staff anticipates that most, if not all, of the 7-Year CIP projects are categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR Section 15301) or Class 2 (Replacement or Reconstruction, 14 CCR Section 15302). However, individual project analysis will occur as the projects are funded or when appropriate under CEQA.

Recommended Actions:

Staff Recommendation ..recommendation
Staff recommends that the City Council:

1. Approve and adopt the 2025 Measure M2 Seven-Year Capital Improvement Program for Fiscal Years 2025-2026 through 2031-2032; and
Adopt Resolution No. 25-83 entitled A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE CONCERNING THE STATUS AND UPDATE OF THE CIRCULATION ELEMENT, AND MITIGATION FEE PROGRAM FOR THE MEASURE M (M2) PROGRAM; and

3. Adopt Resolution No. 25-84 entitled A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SAN CLEMENTE CONCERNING THE STATUS AND UPDATE OF THE PAVEMENT MANAGEMENT PLAN FOR THE MEASURE M (M2) PROGRAM; and

2. Authorize and direct the Public Works Director/City Engineer to submit Measure M2 funding eligibility requirements on behalf of the City of San Clemente to the Orange County Transportation Authority and take all actions necessary and proper to obtain Measure M2 funding for Fiscal Year 2025-2026.
..end
Attachment:

1. Seven-Year CIP Program

2. Resolution No. 25-83

3. Resolution No. 25-84

4. Pavement Management Plan (PMP)
Notification:

None.
334
Attachment 2
RESOLUTION NO. 25-83

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE CONCERNING THE STATUS AND

UPDATE OF THE CIRCULATION ELEMENT, AND
MITIGATION FEE PROGRAM FOR THE MEASURE M (M2)

PROGRAM
WHEREAS, the City of San Clemente desires to maintain and improve the streets within its jurisdiction, including those arterials contained in the Master Plan of Arterial Highways (MPAH); and
WHEREAS, the City of San Clemente has endorsed a definition of and process for, determining consistency of the City’s Traffic Circulation Plan with the MPAH; and WHEREAS, the City of San Clemente has adopted a General Plan Circulation Element which does not preclude implementation of the MPAH within its jurisdiction; and WHEREAS, the City of San Clemente is required to adopt a resolution biennially informing the Orange County Transportation Authority (OCTA) that the City’s Circulation Element is in conformance with the MPAH and whether any changes to any arterial highways of said Circulation Element have been adopted by the City/County during Fiscal Years (FY) 2023-24 and FY 2024-25; and
WHEREAS, the City of San Clemente is required to send biennially to the OCTA all recommended changes to the City Circulation Element and the MPAH for the purposes of re-qualifying for participation in the Comprehensive Transportation Funding Programs; and
WHEREAS, the City of San Clemente is required to adopt a resolution biennially certifying that the City has an existing Mitigation Fee Program that assesses traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to the new development; and NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of San Clemente, does hereby inform OCTA that:

SECTION 1. The arterial highway portion of the Circulation Element of the City is in conformance with the MPAH.
335
Resolution No. 25-83 Page 2
SECTION 2. The City attests that no unilateral reduction in through lanes has been made on any MPAH arterials during FY 2023-24 and FY 2024-25.

SECTION 3. The City affirms that it will bring forward requests to amend the MPAH, when necessary, in order to ensure that the MPAH and the General Plan Circulation Element remain consistent.

SECTION 4. The City reaffirms that the existing Mitigation Fee Program is in effect.

SECTION 5. The City Clerk shall certify the passage and adoption of this Resolution and enter it into the book of original resolutions.

PASSED, APPROVED AND ADOPTED this ____ day of June, 2025.

ATTEST:
_______________________________ _____________________________ City Clerk of the City of San Clemente, Steve Knoblock, Mayor of the City of California San Clemente, California
336
Resolution No. 25-83 Page 3

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-83 was adopted at a regular meeting of the City Council of the City of San Clemente held on ______ day of June 2025, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. ____________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
337
Attachment 3
RESOLUTION NO. 25-84

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

SAN CLEMENTE CONCERNING THE STATUS AND

UPDATE OF THE PAVEMENT MANAGEMENT PLAN FOR
THE MEASURE M (M2) PROGRAM
WHEREAS, the local jurisdiction is required to meet eligibility requirements and submit eligibility verification packages to the Orange County Transportation Authority (OCTA) in order to remain eligible to receive M2 funds; and WHEREAS, the local jurisdiction is required to adopt and update a Pavement Management Plan (PMP), using the required format, regarding the status of road pavement conditions and implementation of the PMP on a biennial basis; and WHEREAS, the local jurisdiction is required to provide a plan that manages the preservation, rehabilitation, and maintenance of paved roads by analyzing pavement life cycles, assessing overall system performance costs, and determining alternative strategies and costs necessary to improve paved roads.

NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of San Clemente does hereby inform OCTA that:

SECTION 1. The PMP is in conformance with the PMP Submittal Template provided in the Countywide Pavement Management Plan Guidelines.

SECTION 2. The City hereby adopts a PMP and has provided an updated PMP report, using the required format, to OCTA.

SECTION 3. The Public Works Director, City Engineer or his designee is authorized to sign the PMP certification form.

SECTION 4. The City Clerk shall certify the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED, APPROVED AND ADOPTED this ____ day of June, 2025. 338
Resolution No. 25-84 Page 2
ATTEST:
_______________________________ _____________________________ City Clerk of the City of San Clemente, Steve Knoblock, Mayor of the City of California San Clemente, California

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §

CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-84 was adopted at a regular meeting of the City Council of the City of San Clemente held on ______ day of June 2025, by the following vote:

AYES:

NOES:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. ____________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
339
2025 Pavement Management Program
Update
Public Works Department,
Engineering Division
910 Calle Negocio, Suite 100
San Clemente, CA 92673
Draft Report
May 2025
2300 E. Katella Avenue, Suite 125
Anaheim, CA 92806
Attachment 4
340
Draft Report
2025 Pavement Management Program Update
City of San Clemente
Draft Report
May 2025
Prepared for:

Public Works Department, Engineering Division
910 Calle Negocio, Suite 100
San Clemente, CA 92673
Prepared by:

Timin Punnackal, P.E. (NV)
Senior Engineer
Jose Medina
Project Engineer
Vivek Jha, P.E. (MD)
Associate
NCE
2300 E. Katella Avenue, Suite 125
Anaheim, CA 92806
(657) 275-3018
NCE Project No. 790.06.30

341
2025 Pavement Management Program Update
Executive Summary City of San Clemente
ES-1
Executive Summary
Nichols Consulting Engineers, Chtd. (NCE) was selected by the City of San Clemente (City) to update its Pavement Management Plan (PMP). The PMP's purpose is to help educate policymakers about the street network's current condition and the impact of various scenarios on future network conditions, as well as complying with the Orange County Transportation Authority (OCTA)’s Measure M2 Program where the City must biennially update and adopt its PMP. This report summarizes the findings from the 2025 PMP update.

The City is responsible for maintaining approximately 137.8 centerline miles of streets, representing a substantial investment of approximately $657.8 million. The street network includes 26.2 miles of MPAH streets, 108.5 miles of local streets, and 3.1 miles of alleys. In April 2025, NCE performed a condition survey for the City’s street network. Table A below summarizes the network’s Pavement Condition Index (PCI) breakdown by functional classification based on the projected PCI value from StreetSaver®:

Table A. Street Network PCI Breakdown
Functional Class Centerline
Mileage
Percent
Area
Weighted Average
PCI* - 2023
Weighted Average
PCI* - 2025 Condition
MPAH 26.2 30.3 84 84 Good
Local 108.5 68.5 83 83 Good
Alley 3.1 1.2 72 71 Fair
Total 137.8 100% 84 83 Good *
The weighted average PCI is calculated by multiplying the area of each street section by the PCI of that section, totaling all sections together, and then dividing by the total area of the network area or functional classification.

The City of San Clemente Street Network's 2025 weighted average (by area) PCI is 83, and was measured to be 84 during the last cycle in 2023. Overall, 45.8 percent of the City’s Street Network area is in “Very Good” condition, 42.1 percent is in “Good” condition, 10.1 percent is in “Fair” condition, 1.9 percent is in “Poor” condition, and 0.1 percent is in “Very Poor” condition.

The OCTA Measure M Regional Capacity Program (Project O)—which provides Measure M2 grant funding for arterial, intersection, and freeway/arterial improvements—includes an incentive for successful implementation of a PMP. The incentive is a 10 percent reduction in local matching fund requirements if either of the following conditions apply:
a) Show measurable improvement of paved street conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of 1 PCI point with no reduction in the overall weighted (by area) average PCI in the MPAH or local street categories; – OR –
b) Have street pavement conditions for the overall network during the previous reporting period within the highest 20 percent of the scale for street pavement conditions in conformance with OCTA Ordinance No.3, defined as a PCI of 75 or higher.

The City’s PCI meets the requirements as noted in the preceding paragraph (b) by keeping the PCI greater than 75, with the MPAH and Local street network showing PCI greater than 80. The City will therefore be eligible for the 10 percent reduction in local matching fund requirements. 342
2025 Pavement Management Program Update
Executive Summary City of San Clemente
ES-2
Using the StreetSaver® PMP Software, the budget needs analysis indicated that the City needs to spend approximately $33.27 million over the next seven years to bring the street network to a condition that can be maintained with ongoing preventive maintenance in the most cost-effective way. However, this is an idealized approach where most of the spending occurs in the first year and subsequently tapers down to a cost-effective budget. For a more practical approach, three budget scenarios were performed as part of this report using an annual inflation factor of 4.5 percent. The budgeted amounts for the three scenarios reflect the total project costs including staff time, design, construction management, contingencies, and all non-Asphalt Concrete (AC) related work.

Three budget scenarios were analyzed using an inflation rate of 4.5 percent from 2025 to 2031.

Scenario 1: City’s Existing Budget ($4.20M-$5.05M per year)– At the City’s current funding level of $34.5 million the network PCI will drop to 80. The network PCI will increase to 85 and 84 in the following years, but then it will drop to 80. However, the deferred maintenance1 will decrease from $13.34 million
to $9.82 million by the end of FY 31/32.

Scenario 2: Maintain PCI at 83 ($4.20-$7.00M per year)– The result shows that the City will need to spend a total of $41.87 million over the next seven years (approximately $5.98 million per year) to maintain the network PCI at 83. With this amount of funding, the deferred maintenance will decrease to $170 thousand by FY 31/32.

Scenario 3: Increase PCI to 84 ($4.20M-$8.00M per year)– This scenario determines the additional funding required to improve network PCI to 84. The result shows that the City will need to spend a total of $47.07 million over seven years to increase the network PCI to 84. Additionally, deferred maintenance will decrease from $13.34 million to $170 thousand by the end of FY 31/32.

The following table summarizes each scenario with its corresponding 7-year budget, the PCI, and deferred maintenance costs at the end of the analysis period.

Table C. Budget Scenario Analysis Summary
Scenario Description
Cumulative
7-year
Budget ($M)
FY 31/32
Network PCI Deferred
Maintenance ($M)
1 City’s Budget 34.50 80 9.82
2 Maintain PCI at 83 41.87 83 0.17
3 Increase PCI to 84 47.07 84 0.17
Conclusion
Based on the pavement conditions, the City has met OCTA’s requirements for receiving a 10 percent reduction in the local matching fund. However, Scenario 1 illustrates that the City’s current annual funding level will reduce the deferred maintenance but decrease the PCI. In Scenario 2, PCI will remain at 83 for the next seven 1 Deferred maintenance refers to maintenance activities that were either not performed when they should have been or were scheduled but delayed to a future period due to a lack of funding. Due to software limitations, deferred maintenance in all scenarios has been estimated rather than directly calculated. 343
2025 Pavement Management Program Update
Executive Summary City of San Clemente
ES-3
years. Scenario 3, the PCI will increase by one point for the next reporting cycle and will maintain a PCI of 84 for the rest of the analysis period in FY 31/32.

All three scenarios maintain an overall PCI above 75, thereby preserving the City’s eligibility for the 10 percent local matching fund reduction under OCTA guidelines. It is also important to note that all three scenarios reduce the level of deferred maintenance.

Recommendations
NCE recommends that the City consider the following:

1. Pavement Budget - NCE recommends that the City adopt Scenario 2. This will ensure that the City’s PCI is maintained at the existing level while reducing the deferred maintenance to $170 thousand. It should be noted that this scenario will require the City to increase the funding from $34.5 million to $41.87 million.

2. Additional Funding - To address the gap between the City's existing funding and the recommended scenario, NCE recommends that the City take full advantage of RMRA (SB-1)2 and actively pursue
additional pavement funding sources if feasible.

3. Pavement Maintenance Strategies - NCE recommends that the City continue prioritizing a well-funded preventive maintenance program with rehabilitation projects to improve pavement currently in poor condition. This is necessary to at least maintain the portion of the street network that is in good condition and avoid increasing the deferred maintenance. NCE also recommends the City considers alternative treatments to conventional overlays, such as Full-depth reclamation (FDR), Cold-in-place recycling (CIR), Cold central plant recycling (CCPR), Asphalt-rubber aggregate membrane (ARAM), Fiber reinforced asphalt concrete (FRAC), and Asphalt rubber hot mix (ARHM).

4. Inspection Strategies – To continue monitoring the street network and follow OCTA Measure M2 requirements, it is recommended that MPAH streets continue to be inspected every 2 years and residential streets at least once every six years. Please note, the City currently inspects the entire MPAH and about one-third of local streets every 2 years.

5. Maintenance and Rehabilitation (M&R) Decision Tree - It is crucial to review and update the M&R treatment strategies and associated unit costs annually to reflect new construction techniques/ costs so that the budget analysis results can remain reliable and accurate. 2 Road Maintenance and Rehabilitation Account (RMRA), established under California Senate Bill 1 (SB-1), provides dedicated funding for road repairs, maintenance, and transportation infrastructure improvements across the state. 344
2025 Pavement Management Program Update
Table of Contents City of San Clemente
i
Table of Contents
Executive Summary ......................................................................................................................... ES-1 1 Introduction and Background .................................................................................................. 3

1.1 Purpose ..................................................................................................................................... 3 2 Pavement Distress Data Collection ........................................................................................... 1

2.1 Pavement Condition Survey ...................................................................................................... 1

2.2 Quality Assurance/Quality Control ........................................................................................... 2

2.3 Advisory Note ............................................................................................................................ 3 3 Network Summary ................................................................................................................... 4 4 Pavement Condition ................................................................................................................ 5 5 Reduction in M2 Local Match ................................................................................................. 11 6 Maintenance and Rehabilitation Strategies ........................................................................... 12 7 Budget Analysis ..................................................................................................................... 15

7.1 Budget Needs .......................................................................................................................... 15

7.2 Budget Scenarios .................................................................................................................... 16

7.3 Scenario 1: City’s Existing Budget ($4.20M-$5.05M per year) ............................................... 17

7.4 Scenario 2: Maintain PCI at 83 ($4.20-$7.00M per year) ....................................................... 18

7.5 Scenario 3: Increase PCI to 84 ($4.20M-$8.00M per year) ..................................................... 19

7.6 Scenario Comparisons ............................................................................................................. 20 8 Conclusion and Recommendations ........................................................................................ 22

8.1 Findings ................................................................................................................................... 22

8.2 Recommendations .................................................................................................................. 22 List of Appendices
Appendix 1
Section Description Inventory – Average (Weighted by Area) PCI Appendix 2
7-Year Work Plan per Scenario 1
Appendix 3
OCTA Pavement Management Plan Agency Submittal
345
2025 Pavement Management Program Update
Table of Contents City of San Clemente
ii
List of Figures
Figure 1. NCE’s Data Collection Vehicle......................................................................................................... 2 Figure 2. Examples of Streets with Different PCIs. ........................................................................................ 6 Figure 3. Percent Pavement Area by Condition Category. ............................................................................ 7 Figure 4. Street Network PCI Comparison with Other Surrounding Agencies. ........................................... 10 Figure 5. Costs of Maintaining Pavements Over Their Service Lives. .......................................................... 12 Figure 6. PCI vs Deferred Maintenance for Scenario 1. ............................................................................... 17 Figure 7. PCI vs Deferred Maintenance for Scenario 2. ............................................................................... 18 Figure 8. PCI vs Deferred Maintenance for Scenario 3. ............................................................................... 19 Figure 9. Comparison of Annual PCI by Scenario. ....................................................................................... 20 Figure 10. Comparison of Annual Deferred Maintenance by Scenario. ...................................................... 20 Figure 11. Comparison of Pavement Condition by FY 31/32 Breakdown by Scenarios. ............................. 21 List of Tables
Table 1. Network Summary Statistics by Functional Class ............................................................................ 4 Table 2. Pavement Condition Categories ...................................................................................................... 7 Table 3. Pavement Condition Summary - Citywide ....................................................................................... 8 Table 4. Pavement Condition Summary – MPAH Network ........................................................................... 8 Table 5. Pavement Condition Summary – Local Network ............................................................................. 9 Table 6. Pavement Condition Summary – Alley Network ............................................................................. 9 Table 7. AC Pavement Maintenance and Rehabilitation Decision Tree ...................................................... 13 Table 8. AC Pavement Maintenance and Rehabilitation Decision Tree - PCC ............................................. 14 Table 9. Budget Needs from an Unconstrained Budget. ............................................................................. 15 Table 10. Budget Scenario Analysis Summary. ............................................................................................ 16 Table 11. Summary of Results from Scenario 1 Analysis ............................................................................. 17 Table 12. Summary of Results from Scenario 2 Analysis ............................................................................. 18 Table 13. Summary of Results from Scenario 3 Analysis ............................................................................. 19 346
2025 Pavement Management Program Update
Introduction and Background City of San Clemente
3 1 Introduction and Background
Nichols Consulting Engineers, Chtd. (NCE) was selected by the City of San Clemente to perform an update of the City’s Pavement Management Plan (PMP). In general, PMPs are “designed to provide objective information and useful data so that managers can make more consistent, cost effective, and defensible decisions related to the preservation of a pavement network.3
” The goal of this effort was to update the PMP with current pavement conditions and to perform funding analyses to help inform and educate policy makers as well as to comply with the Orange County Transportation Authority’s (OCTA) Measure M2 Program.

To update the City’s PMP, NCE performed pavement condition surveys of the Master Plan Arterial Highway (MPAH) network, also known as the Arterial Highway System (AHS), and approximately one-third of the City’s Local Street System (LSS) in compliance with ASTM D64334—as required by OCTA’s “Citywide Pavement Management Plan Guidelines”. The surveys did not include non-pavement issues such as traffic, safety and street hazards, geometric issues, shoulders, sidewalks, curb and gutters, drainage issues, or immediate maintenance needs.

After inspection, all survey data was entered into the City’s StreetSaver® database, and pavement condition index (PCI) calculations were performed. NCE then disucssed with City staff and reviewed and updated the City’s decision tree including maintenance and rehabilitation (M&R) strategies treatment unit costs. A budget needs analysis was then performed, and three budget scenarios were analyzed for the street network.

This report answers the following questions for the City of San Clemente:

What does the City’s pavement network include?
What is the current condition of the pavement network?
What are the City’s current M&R strategies?
How much funding is required to perform all the M&R treatments needed over the next seven years? What effect will City’s existing funding and other funding levels have on the network condition and deferred maintenance?

1.1 Purpose
The purpose of this report is to assist policy makers in using the results of the PMP. This report analyzes different levels of funding and maximizes the return from expenditure by selecting the most cost-effective repairs.

This report also assists the City with identifying M&R priorities specific to the City’s needs, and highlights options for improving the current PCI. These options are developed by conducting "what-if" analyses using StreetSaver® software. By analyzing different budget allocation strategies for pavement maintenance and repair, as well as assessing the funding required to maintain or increase the City’s PCI, the impact of different funding levels on the City’s streets for the next seven years was determined.

A thorough understanding of the overall infrastructure condition is essential for effective planning and maintenance strategies. To support this, in April 2025, NCE was tasked with assessment of both the MPAH and 3 AASHTO “Guidelines for Pavement Management Systems.” American Association of State Highway and Transportation Officials, Washington DC, July 1990. 4
ASTM. "ASTM D6433." Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys. 347
2025 Pavement Management Program Update
Introduction and Background City of San Clemente
4 approximately one-third of Local roads via a semi-automated inspection method. The assessment involved a comprehensive pavement condition survey conducted in accordance with ASTM D6433 protocols for the whole of the project. This survey provided a holistic assessment of pavement conditions for the City's network. The StreetSaver® database was subsequently updated to reflect both the latest inspection data and all pavement M&R treatments constructed since 2023.

348
2025 Pavement Management Program Update
Pavement Distress Data Collection City of San Clemente
Draft Report May 2025
1 2 Pavement Distress Data Collection
Reliable pavement data is essential for making smart, cost-effective decisions about street maintenance. Highquality information ensures that repairs are prioritized where they're needed most, resources are used efficiently, and our roads remain safe and accessible for everyone.

2.1 Pavement Condition Survey
NCE's MTC and OCTA certified inspection vehicles performed comprehensive pavement condition surveys on approximately 65.3 centerline miles of City-maintained streets. The survey included the assessment of all functional classifications within the City's street network.

2.1.1 Automated Data Collection for Streets
Our Roadway Collection Vehicle System, which is certified by OCTA and MTC, uses a 6D Dual-lane Road LiDAR Scanner that automatically collects a wide variety of pavement defects and pavement surface damage(s) using advanced laser scanning technology to capture high resolution 3D roadway surface profiles and 2D digital pavement images. As part of this survey, 100% of the length of each street segment was surveyed. For street sections with four or more lanes, NCE conducted multiple passes (at least one in each direction) to collect sufficient data.

Our system comprises many sub-components (see Figure 1 below) to provide automated, real-time, accurate, and repeatable roadway condition results, such as:

Inspection survey distances
Longitudinal roughness "rideability"
Crack detection and measurement
2D and 3D pavement profiles
Wheel track rutting depths and transverse profiles
Global positioning (GPS) system integration
The pavement distress data collection process involved the use of high-resolution 3D digital imaging technology and integrated distress laser pavement roadway scanners, which allowed us to correctly quantify the type, severity, extent, start and stop points of all ASTM D6433-20 pavement distresses. 349
2025 Pavement Management Program Update
Pavement Distress Data Collection City of San Clemente
Draft Report May 2025
2 Figure 1. NCE’s Data Collection Vehicle.

2.2 Quality Assurance/Quality Control
Quality management practices for pavement management suggest that a one-time inspection of the final data is typically inadequate and involves a high risk of failure. We recognize the importance of effectively implementing and maintaining quality control and assurance practices for pavement distress data. We use a proven approach that integrates quality management and control procedures throughout the entire data collection and delivery process.

NCE implemented a robust, multi-step QA/QC process for all data collection activities in San Clemente, including multiple data verification methods, systematic quality checks, and technical validation.

2.2.1 Multiple Data Verification Methods
To ensure accuracy, several independent methods were used to verify the pavement condition data.

Comparison with M&R Data: Cross-checking distress data with recent maintenance records provided by the City of San Clemente.

Historical PCI Comparison: Typically, PCI drops by 3-5 points per year, so any sections that dropped more than that were flagged for review.

Desktop Review by Certified Inspectors: Randomly selected inspections were independently reviewed by certified pavement inspectors to verify accuracy.

2.2.2 Systematic Quality Checks
NCE reviewed field procedures, compared field data with on-site conditions, and conducted random spot checks of data entry. Special attention was given to ensuring consistency between the automated street surveys and manual cul-de-sac/alleyway inspections.
350
2025 Pavement Management Program Update
Pavement Distress Data Collection City of San Clemente
Draft Report May 2025
3 2.2.3 Technical Validation
All processed data underwent final technical validation before being integrated into the PMS database. This included verification of data completeness, format consistency, and logical validation of condition values. The data collection systems were operated by certified technicians, ensuring consistency and reliability in the collected data.

2.3 Advisory Note
It should be noted that this scope of work and condition surveys did not address issues including, but not limited to traffic, safety and road hazards, geometric issues, road shoulders, sidewalks, curb and gutters, drainage issues, or short-term maintenance that should be performed. 351
2025 Pavement Management Program Update
Network Summary City of San Clemente
Draft Report May 2025
4 3 Network Summary
The City is responsible for maintaining approximately 137.8 centerline miles of streets. The street network includes 26.2 miles of Master Plan of Arterial Highways (MPAH network), 108.5 miles of local streets, and 3.1 miles of alleys. The network is composed primarily of asphalt concrete (AC) pavement, including 0.04 centerline miles of Portland cement concrete pavements (PCC). Table 1 summarizes the street network by functional class.

Table 1. Network Summary Statistics by Functional Class Functional Class Centerline
Mileage
Percent
Area
Weighted
Average PCI1 Condition
MPAH 26.2 30.3 84 Good
Local 108.5 68.5 83 Good
Alley 3.1 1.2 71 Fair
Total 137.8 100.0% 83 Good
The changes observed in the total centerline miles of the network compared to the 2023 PMP report are due to three sections that were removed from the database. These sections are Avenida Talega between Camino Tierra Grande to the end, an Alley by Avenida de la Grulla, and Avenida Fabricante from Calle Iglesia to the end of the road.

Street pavements are among the City’s most valuable assets, with a total street network replacement cost estimated at approximately $657.8 million. This can be viewed as the value of the pavement network and is the amount needed to fund full reconstruction (“replacement”), including the aggregate base, of the entire paved network. It does not include related infrastructure assets such as sidewalks, signals, markings, signs, or storm drains.
352
2025 Pavement Management Program Update
Pavement Condition City of San Clemente
Draft Report May 2025
5 4 Pavement Condition
The PCI is a measurement of pavement grade or condition and ranges from 0 to 100. A newly constructed street will have a PCI of 100, while a street in very poor condition will have a PCI of 25 or less. The pavement condition is primarily affected by the climate, traffic loads and volumes, construction materials, utility trench cuts, and age. The symptoms manifested by the pavement as it ages or fails are determined by the distress types that are present, which for asphalt concrete pavements and Portland cement concrete pavements include:

Asphalt Concrete Pavements:

Alligator (Fatigue) Cracking Patching and Utility Cut Patching Bleeding Polished Aggregate
Block Cracking Potholes
Bumps & Sags Railroad Crossing
Corrugation Rutting
Depression Shoving
Edge Cracking Slippage Cracking
Joint Reflection Cracking Swell
Lane/Shoulder Drop-Off Raveling
Longitudinal/Transverse Cracking Weathering
Portland Cement Concrete Pavements:

Blowup/Buckling Popouts
Corner Break Pumping
Divided Slab Punchout
Durability Cracking Scaling
Patching (Large and Small) Spalling (Corner and Joint)
Linear Cracking
The photographs in Figure 2 illustrate the City’s asphalt concrete streets and show a range of PCIs. 353
2025 Pavement Management Program Update
Pavement Condition City of San Clemente
Draft Report May 2025
6 Note: All photos were captured during the April 2025 pavement condition survey.

Figure 2. Examples of Streets with Different PCIs.

The PCI scale is divided into 5 general condition categories. Pavements in “Very Good” condition have a PCI at or above 86, pavements in “Good” condition have a PCI between 75 and 85, pavements in “Fair” condition have a PCI between 60 and 74, pavements in “Poor” condition have a PCI between 41 and 59, and finally pavements in “Very Poor” condition have a PCI at or below 40. Table 2 shows the PCI range for each condition category, which is outlined by OCTA in the “Countywide Pavement Management Plan Guidelines.” These PCI ranges are established for consistent reporting across all OCTA agencies, but do not dictate PCI ranges for recommended treatments established in the agency’s Decision Tree.
354
2025 Pavement Management Program Update
Pavement Condition City of San Clemente
Draft Report May 2025
7 Table 2. Pavement Condition Categories
Condition Category PCI Range Description
Very Good 86 – 100 Pavements with little or no distress.

Good 75 – 85 Pavements which have some distresses which are predominantly non-load related.

Fair 60 – 74 Pavements which have a significant level of distress which are predominantly load related.

Poor 41-59 Pavements which have major distress.

Very Poor 0 – 40 Pavements which have an extensive amount of distress.

The City’s overall weighted average PCI for the network in 2025 was calculated to be 83, which places the overall network pavement condition in the “Good” category. The network PCI was maintained the same since 2023.

Figure 3 breaks down the total network pavement area percentage by current condition category and functional classification.

Figure 3. Percent Pavement Area by Condition Category.

Table 3 through Table 6 provide a pavement condition breakdown for the citywide street network as well as the MPAH and Local networks by condition category. Overall, 45.8 percent of the City’s Street Network area is in “Very Good” condition, 42.1 percent is in “Good” condition, 10.1 percent is in “Fair” condition, 1.9 percent is in “Poor” condition, and 0.1 percent is in “Very Poor” condition.

Very Good
PCI 100-86

45.8%
Good
PCI 85-75

42.1%
Fair
PCI 74-60

10.1%
Poor
PCI 69-41

1.9%
Very Poor
PCI <40

0.1%
Citywide
Very Good Good Fair Poor Very Poor

47.2%

45.2%

5.9%

1.7% 0.0%
MPAH Network

30.3% of City
by pavement area

45.5%

40.8%

12.0%

1.7% 0.0%
Local Network

68.5% of City
by pavement area

32.6%

34.7%

4.4%

22.8%

5.5%
Alley Network

1.2% of City
by pavement area
355
2025 Pavement Management Program Update
Pavement Condition City of San Clemente
Draft Report May 2025
8 Table 3. Pavement Condition Summary - Citywide
Condition Category PCI Range Centerline
Mileage
Percent
Centerline
Mileage
Pavement Area (sf) Percent Area
Very Good 86 – 100 62.9 45.6% 14,002,712 45.8%
Good 75 – 85 57.3 41.5% 12,855,837 42.1%
Fair 60 – 74 14.9 10.9% 3,075,975 10.1%
Poor 41-59 2.5 1.8% 594,654 1.9%
Very Poor 0 – 40 0.2 0.2% 27,113 0.1%
Totals 137.8 100.0% 30,556,291 100.0%
Table 4. Pavement Condition Summary – MPAH Network
Condition Category PCI Range Centerline
Mileage
Percent
Centerline
Mileage
Pavement Area (sf) Percent Area
Very Good 86 – 100 12.7 48.5% 4,368,528 47.2%
Good 75 – 85 11.3 43.1% 4,184,508 45.2%
Fair 60 – 74 1.8 6.9% 543,441 5.9%
Poor 41-59 0.4 1.5% 152,992 1.7%
Very Poor 0 – 40 0 0.0% 0 0.0%
Totals 26.2 100.0% 9,249,469 100.0%
356
2025 Pavement Management Program Update
Pavement Condition City of San Clemente
Draft Report May 2025
9 Table 5. Pavement Condition Summary – Local Network
Condition Category PCI Range Centerline
Mileage
Percent
Centerline
Mileage
Pavement Area (sf) Percent Area
Very Good 86 – 100 49.0 45.2% 9,513,182 45.5%
Good 75 – 85 44.7 41.2% 8,542,382 40.8%
Fair 60 – 74 13.1 12.0% 2,516,334 12.0%
Poor 41-59 1.7 1.6% 356,942 1.7%
Very Poor 0 – 40 0.0 0.0% 6,513 0.0%
Totals 108.5 100.0% 20,935,353 100.0%
Table 6. Pavement Condition Summary – Alley Network
Condition Category PCI Range Centerline
Mileage
Percent
Centerline
Mileage
Pavement Area (sf) Percent Area
Very Good 86 – 100 1.1 35.5% 121,002 32.6%
Good 75 – 85 1.2 38.7% 128,947 34.7%
Fair 60 – 74 0.2 6.5% 16,200 4.4%
Poor 41-59 0.4 12.9% 84,720 22.8%
Very Poor 0 – 40 0.2 6.5% 20,600 5.5%
Totals 3.1 100.0% 371,469 100.0%

357
2025 Pavement Management Program Update
Pavement Condition City of San Clemente
Draft Report May 2025
10 Figure 4 illustrates PCI comparisons between the City and the surrounding agencies using information gathered from the 2022 California Statewide Local Streets and Roads Needs Assessment5. The City’s PCI of 83 in 2025 and 2023 placed the City network in “Good” condition, which positions the City above the 2022 statewide average of

65. Compared to neighboring cities, the City’s PCI is above the 2022 Countywide average of 79.

Figure 4. Street Network PCI Comparison with Other Surrounding Agencies. 5 “California Statewide Local Streets and Roads Needs Assessment 2022 Update”. Nichols Consulting Engineers, Chtd., CA, 2023
72 79
81 82 83 84 85 85
0 10
20 30
40 50
60 70
80 90
100
San Juan
Capistrano
Laguna
Niguel
Newport
Beach
Aliso Viejo San
Clemente
Mission
Viejo
Dana Point Orange
County
Agencies
Statewide Average PCI = 65
PCIs from the 2022 Statewide Needs Assessment
358
2025 Pavement Management Program Update
Reduction in M2 Local Match City of San Clemente
Draft Report May 2025
11 5 Reduction in M2 Local Match
The OCTA Measure M Regional Capacity Program (Project O) - which provides Measure M2 grant funding for arterial, intersection, and freeway/arterial improvements, includes an incentive for successful implementation of a PMP. The incentive is a 10 percent reduction in local matching fund requirements if either of the following conditions apply:
a) Show measurable improvement of paved street conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of 1 PCI point with no reduction in the overall weighted (by area) average PCI in the MPAH or local street categories; – OR –
b) Have street pavement conditions for the overall network during the previous reporting period within the highest 20 percent of the scale for street pavement conditions in conformance with OCTA Ordinance No.3, defined as a PCI of 75 or higher.

The City’s PCI of 72 meets the requirements as noted in the preceding paragraph (b) by keeping the PCI greater than 75, with the MPAH and Local street network showing PCI greater than 80. The City will therefore be eligible for the 10 percent reduction in local matching fund requirements for the next 2-year cycle. 359
2025 Pavement Management Program Update
Maintenance and Rehabilitation Strategies City of San Clemente Draft Report May 2025
12 6 Maintenance and Rehabilitation Strategies
In general, surface treatments such as crack seals or slurry seals are used when the pavements are in “Good” to “Very Good” condition. This type of treatment is usually considered “preventive maintenance”. When the pavement condition deteriorates to lower levels, overlays with digouts6 or surface reconstruction treatments
need to be performed. These are considered “rehabilitation” or “reconstruction”. Additionally, digouts are commonly done in preparation for overlay and slurry seal treatments.

Based on a discussion with City staff, the M&R decision tree was updated and is included in Appendix B. This determined the most effective and realistic treatments for each group of streets by functional class and condition category.

Figure 5 illustrates that pavement maintenance follows the old colloquial saying of "pay now or pay more later".

History has shown that it costs much less to maintain streets in good condition than to repair streets that have failed. By letting pavements deteriorate, streets that once cost $5.41 per square yard to slurry seal may in a few years cost as much as $95.00 per square yard to rehabilitate or $155.00 per square yard to reconstruct. The costs shown in the chart above are updated prices provided by the City for 2025. The pavement deterioration curve shown above describes how pavements deteriorate over time.

Figure 5. Costs7 of Maintaining Pavements Over Their Service Lives.

Pavements in “Good” condition pavements start to show some distresses that can be treated with preventive maintenance such as slurry seal. This will be required to bring its condition back to “Very Good”. Pavements in 6 "Digouts" is often referred to as R&R (remove and replace), base repair, or patch paving. 7 In addition to the contractor’s prices, unit costs are loaded to include staff time, design, construction management, contingencies, and non-asphalt concrete related work.
360
2025 Pavement Management Program Update
Maintenance and Rehabilitation Strategies City of San Clemente Draft Report May 2025
13 the “Fair” condition show some form of distress that require more than preventive maintenance. At this point, a well-designed pavement will have reached between 35 and 50 percent of its life, and an overlay will be required.

A key element of a pavement management repair strategy is to keep streets in the “Good” to “Fair” categories from deteriorating. This is particularly true for streets in the “Fair” range, since pavement deterioration will accelerate if left untreated.

For pavements in the “Poor” category, approximately 30 percent of service life is left—a thicker overlay (2 to 4 inches) would be required to increase the PCI above 70. Pavements in “Very Poor” condition are near the end of their service lives and often exhibit severe forms of distress such as potholes, rutting, and extensive cracking. At this stage, surface reconstruction is typically required. The surface reconstruction includes new asphalt with localized repair and compaction of the aggregate base.

The City’s maintenance and rehabilitation decision tree for both MPAH and Local networks are generalized in Table 7 below.

Table 7. AC Pavement Maintenance and Rehabilitation Decision Tree Condition Category AC Pavements
Very Good
(PCI 86 – 100)
Crack Seal
($1.00/SY)
Good
(PCI 75 – 85)
Crack Seal and Slurry Seal
($5.41/SY)
Fair
(PCI 60 – 74)
Grind & 2” AC Overlay with 2% Base Repair
($61.00/SY)
Poor
(PCI 41 – 59)
Grind & 3” AC Overlay with 5% Base Repair
($95.00/SY)
Very Poor
(PCI 0 – 40)
Reconstruction – 3” AC+9” AB
($155.00/SY)
The City has only 0.04 centerline miles of PCC pavements in “Very Good” Condition. The maintenance and rehabilitation decision tree for PCC pavements are summarized in Table 8 below. 361
2025 Pavement Management Program Update
Maintenance and Rehabilitation Strategies City of San Clemente Draft Report May 2025
14 Table 8. AC Pavement Maintenance and Rehabilitation Decision Tree - PCC Condition Category PCC Pavement
Very Good
Do Nothing
Good
Fair
Poor
Very Poor
(PCI 0 – 40)
Reconstruction
($130.50/SY)
362
2025 Pavement Management Program Update
Budget Analysis City of San Clemente
Draft Report May 2025
15 7 Budget Analysis
Based on the principle that it costs less to maintain streets in good condition than it does to repair those that have failed, cost-effective PMPs employ strategies that eliminate the deferred maintenance and then maintain the network with ongoing preventive maintenance. Such strategies bring the network condition to an optimal PCI that can be maintained over time.

7.1 Budget Needs
The first step in developing a cost-effective strategy is to determine, assuming an unconstrained budget, the total maintenance budget “needs” of the network, in other words the amount of funding required for each street in the network to reach optimal condition based on the policy established in the decision tree. The treatment(s) costs over the analysis period were calculated by multiplying the unit cost by the pavement section area using an inflation rate of 4.5 percent for the fiscal years (FY) 25/26 through FY 31/32.

The budget needs are estimated to be approximately $33.27 million over the next seven years. Of the total budget needs, approximately $14.84M (44.6 percent) is devoted to preventive maintenance, while the rest is allocated for more costly rehabilitation and reconstruction. If the City follows this “ideal” strategy, the average network PCI will increase to 82 by FY 31/32. Table 9 below shows the impacts of expenditure on the PCI, assuming an unconstrained budget.

Table 9. Budget Needs from an Unconstrained Budget.

Fiscal Year Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32 Total Needs
($M)
MPAH NA 2.96 0.1 1.12 0.95 1.69 1.11 0.61 8.54
Local NA 9.05 2.73 3.01 1.43 4.76 1.46 0.73 23.17
Alley NA 1.33 0.00 0.05 0.00 0.17 0.00 0.01 1.56
Overall NA 13.34 2.83 4.18 2.38 6.62 2.57 1.35 33.27
Rehabilitation
($M)
MPAH NA 1.78 0.05 0.01 0.00 0.19 0.76 0.48 3.27
Local NA 7.93 1.98 1.78 0.35 1.32 0.31 0.09 13.76
Alley NA 1.33 0.00 0.05 0.00 0.03 0.00 $0.00 1.41
Overall NA 11.04 2.03 1.84 0.35 1.54 1.07 0.57 18.44
Preventive
Maintenance
($M)
MPAH NA 1.18 0.05 1.11 0.95 1.50 0.35 0.13 5.27
Local NA 1.12 0.75 1.23 1.08 3.44 1.15 0.64 9.41
Alley NA 0.00 0.00 0.00 0.00 0.14 0.00 0.01 0.15
Overall NA 2.30 0.80 2.34 2.03 5.08 1.50 0.78 $14.83
PCI
MPAH 84 87 85 84 83 83 82 81 NA
Local 83 87 86 85 84 84 84 82 NA
Alley 71 90 87 85 84 87 85 84 NA
Overall 83 87 85 85 84 84 83 82 NA
363
2025 Pavement Management Program Update
Budget Analysis City of San Clemente
Draft Report May 2025
16 7.2 Budget Scenarios
Having determined the maintenance needs of the street network, the next step in developing a cost-effective M&R strategy is to conduct several alternative budget or “what-if” scenario analyses. By examining the impacts of budget "scenarios", the advantages, and disadvantages of the four funding levels and maintenance strategies can be illustrated. The three scenarios are required by the OCTA PMP.

The following scenarios were performed for this report using an annual inflation factor of 4.5 percent. The budgeted amounts for the four scenarios reflect the total project costs including staff time, design, construction management, contingencies, and all non-Asphalt Concrete (AC) related work:

Scenario 1: City’s Existing Budget ($4.20M-$5.05M per year)– At the City’s current funding level of $34.5 million the network PCI will drop to 80. The network PCI will increase to 85 and 84 in the following years, but then it will drop to 80. However, the deferred maintenance8 will decrease from $13.34 million to $9.82 million by the end of FY 31/32.

Scenario 2: Maintain PCI at 83 ($4.20-$7.00M per year)– The result shows that the City will need to spend a total of $41.87 million over the next seven years (approximately $5.98 million per year) to maintain the network PCI at 83. With this amount of funding, the deferred maintenance will decrease to $170,000 by FY 31/32.

Scenario 3: Increase PCI to 84 ($4.20M-$8.00M per year)– This scenario determines the additional funding required to improve network PCI to 84. The result shows that the City will need to spend a total of $47.07 million over seven years to increase the network PCI to 84. Additionally, deferred maintenance will decrease from $13.34 million to $170,000 by the end of FY 31/32.

The following table summarizes each scenario with its corresponding 7-year budget, the PCI, and deferred maintenance costs at the end of the analysis period.

Table 10. Budget Scenario Analysis Summary.

Scenario Description
Cumulative
7-year
Budget ($M)
FY 31/32
Network PCI Deferred
Maintenance ($M)
1 City’s Budget 34.50 80 9.82
2 Maintain PCI at 83 41.87 83 0.17
3 Increase PCI to 84 47.07 84 0.17
8 Deferred maintenance refers to maintenance activities that were either not performed when they should have been or were scheduled but delayed to a future period due to a lack of funding. Due to software limitations, deferred maintenance in all scenarios has been estimated rather than directly calculated. 364
2025 Pavement Management Program Update
Budget Analysis City of San Clemente
Draft Report May 2025
17 7.3 Scenario 1: City’s Existing Budget ($4.20M-$5.05M per year) At the City’s current budget of $34.5 million the network PCI will decrease from 83 to 80 over the next seven years. By FY 31/32, 83.8 percent will be in either “Good” or “Very Good” condition, 15.6 percent in “Fair” condition, and approximately 0.6 percent will be in either “Poor” or “Very Poor” condition. The deferred maintenance will decrease from $13.34 million to $9.82 million. Table 11 and Figure 6 show the results of this scenario.

Table 11. Summary of Results from Scenario 1 Analysis
FY Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32 Total City’s Annual
Budget ($M) N/A 4.20 5.05 5.05 5.05 5.05 5.05 5.05 34.50 Rehabilitation
($M) N/A 3.96 0.88 1.35 4.75 4.75 4.70 4.75 25.14
Preventive
Maintenance
($M)
N/A 0.24 4.17 3.70 0.30 0.30 0.35 0.30 9.36
Deferred
Maintenance
($M)

13.34 9.12 8.38 10.97 9.90 12.68 11.87 9.82 N/A
Network PCI 83 85 84 83 82 81 80 80 N/A
Figure 6. PCI vs Deferred Maintenance for Scenario 1.

13.34 9.12 8.38

10.97 9.90

12.68 11.87

9.82 83 85 84 83 82 81 80 80
0 10
20 30
40 50
60 70
80 90
100
0 5
10 15
20 25
30 35
40 Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32
Fiscal Year
Deferred Maintenance ($M) PCI
365
2025 Pavement Management Program Update
Budget Analysis City of San Clemente
Draft Report May 2025
18 7.4 Scenario 2: Maintain PCI at 83 ($4.20-$7.00M per year) This scenario aims to sustain the overall network PCI at 83. As shown in Table 12 and Figure 7, the estimated financial commitment required to accomplish this goal is $41.87 million over seven years—approximately $5.98 million per year. While the network PCI is maintained at 83, the deferred maintenance will decrease to $170,000 by FY 31/32. Additionally, 90.4 percent of the network will be in “Good” or “Very Good” condition, 9.5 percent in “Fair” condition, and only 0.1 percent in either “Poor” condition.

Table 12. Summary of Results from Scenario 2 Analysis
FY Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32 Total City’s Annual
Budget ($M) N/A 4.20 5.05 7.00 7.00 7.00 7.00 4.62 41.87 Rehabilitation
($M) N/A 3.98 4.75 6.61 5.32 2.94 3.81 0.99 28.40
Preventive
Maintenance
($M)
N/A 0.22 0.30 0.39 1.68 4.06 3.19 3.63 13.47
Deferred
Maintenance
($M)

13.3 9.10 8.35 9.00 5.89 6.54 3.29 0.17 N/A
Network PCI 83 85 84 83 83 83 83 83 N/A
Figure 7. PCI vs Deferred Maintenance for Scenario 2.

13.3 9.10 8.35 9.00

5.89 6.54

3.29 0.17
83 85 84 83 83 83 83 83
0 10
20 30
40 50
60 70
80 90
100
0 5
10 15
20 25
30 35
40 Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32
Fiscal Year
Deferred Maintenance ($M) PCI
366
2025 Pavement Management Program Update
Budget Analysis City of San Clemente
Draft Report May 2025
19 7.5 Scenario 3: Increase PCI to 84 ($4.20M-$8.00M per year) Per OCTA requirements, each agency must provide a budget level that will improve the network PCI by one point over the next seven years. This scenario aims to improve the network from 83 to 84 by the next reporting cycle, FY 27/28, and maintain a network PCI of 84 until the end of the analysis period, FY 31/32. As shown in Table 13 and Figure 8, the estimated financial commitment required to accomplish this goal is $47.07 million over seven years—approximately $45.7 million per year. This scenario will result in 96.3 percent of the network being in “Good” or “Very Good” condition, 3.6 percent in “Fair” condition, and 0.0 percent in “Poor” or “Very Poor” condition. The deferred maintenance will reduce to $170,000 by the end of the analysis period.

Table 13. Summary of Results from Scenario 3 Analysis
FY Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32 Total City’s Annual
Budget ($M) N/A 4.20 5.05 8.00 8.00 8.00 6.32 7.50 47.07 Rehabilitation
($M) N/A 2.94 4.45 7.18 3.88 1.98 1.44 4.11 25.98
Preventive
Maintenance
($M)
N/A 1.26 0.60 0.82 4.12 6.02 4.88 3.39 21.09
Deferred
Maintenance
($M)

13.34 9.12 8.38 8.02 3.87 3.43 0.25 0.17 N/A
Network PCI 83 85 84 83 83 84 84 84 N/A
Figure 8. PCI vs Deferred Maintenance for Scenario 3.

13.34 9.12 8.38 8.02

3.87 3.43

0.25 0.17
83 85 84 83 83 84 84 84
0 10
20 30
40 50
60 70
80 90
100
0 5
10 15
20 25
30 35
40 Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32
Fiscal Year
Deferred Maintenance ($M) PCI
367
2025 Pavement Management Program Update
Budget Analysis City of San Clemente
Draft Report May 2025
20 7.6 Scenario Comparisons
Figure 9 compares the annual changes in PCI for each of the scenarios. As described above, the PCI decreases to 80 for Scenario 1, maintained at 83 in Scenario 2 and improves to 84 by the end of FY 31/32 in Scenario 3.

Figure 9. Comparison of Annual PCI by Scenario.

Figure 10 illustrates the changes in deferred maintenance over the 7-year analysis period for each scenario. For Scenario 1 the deferred maintenance increased from $13.34 million to $9.82 million by the end of FY 31/32.

Scenario 2 also increases the deferred maintenance to $170,000. Finally, the deferred maintenance for Scenario 3 is $170,000. Both Scenario 2 and Scenario 3 will practically eliminate the deferred maintenance.

Figure 10. Comparison of Annual Deferred Maintenance by Scenario. 80 83
83 84
73 40
50 60
70 80
90 100
Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32
Fiscal Year
S1: Existing Budget S2: Maintain PCI at 83
S3: Improve PCI to 84 Untreated PCI/Do Nothing

13.34 9.82

0.17 0.17
$0
$10
$20
$30
$40
Current 25/26 26/27 27/28 28/29 29/30 30/31 31/32
Fiscal Year
S1: Existing Budget S2: Maintain PCI at 83
S3: Improve PCI to 84
368
2025 Pavement Management Program Update
Budget Analysis City of San Clemente
Draft Report May 2025
21 Figure 11 illustrates the percent change in pavement condition for each scenario at the end of FY 31/32. As noted previously, currently 45.8 percent of the City’s Street Network area is in “Very Good” condition, approximately 42.1 percent is in “Good” condition, 10.1 percent is in “Fair” condition, 1.9 percent is in “Poor” condition, and 0.1 percent is in “Very Poor” condition. Under Scenario 1, the portion of the network in the “Very Good” or “Good” condition will increase to 83.8 percent, while 15.6 percent of the network will be in “Fair” condition and only 0.6 percent will be in “Poor” and “Very Poor” Conditions. Under Scenario 2, the portion in “Very Good” or “Good” condition will further increase to 90.4 percent, while the portion in “Fair” and “Poor” conditions will be reduced to 9.5 percent and 0.1 percent respectively. Under Scenario 3, the “Very Good” or “Good” portion would be 96.3 percent, leaving 3.6 percent in the “Fair” condition will eliminate all sections under the “Poor” or “Very Poor” conditions.

Figure 11. Comparison of Pavement Condition by FY 31/32 Breakdown by Scenarios.

39.2%

34.6%

14.8%

45.8%

57.1%

55.8%

69.0%

42.1%

3.6%

9.5%

15.6%

10.1%

0.0%

0.1%

0.1%

1.9%

0.0%

0.0%

0.5%

0.1%
0% 20% 40% 60% 80% 100%
S3: Improve PCI to 84
FY31/32 Condition
S2: Maintain PCI at 83
FY31/32 Condition
S1: Existing Budget
FY31/32 Condition
Current Condition
Percent of Network
Very Good Good Fair Poor Very Poor
369
2025 Pavement Management Program Update
Conclusion and Recommendations City of San Clemente
Draft Report May 2025
22 8 Conclusion and Recommendations
In summary, the City of San Clemente has a substantial investment of $657.8 million in the pavement network.

The City of San Clemente Street Network's 2025 weighted average (by area) PCI is 83. Overall, 45.8 percent of the City’s Street Network area is in “Very Good” condition, 42.1 percent is in “Good” condition, 10.1 percent is in “Fair” condition, 1.9 percent is in “Poor” condition, and 0.1 percent is in “Very Poor” condition.

The biennial update of the PMP is an eligibility requirement of the Measure M2 plan administered by OCTA.

Appendix 3 contains the completed PMP template as required by OCTA.

8.1 Findings
Based on the pavement conditions, the City has met OCTA’s requirements for receiving a 10 percent reduction in the local matching fund. However, Scenario 1 illustrates that the City’s current annual funding level will reduce the network PCI to 80. In Scenario 2, PCI will remain at 83 for the next seven years. In Scenario 3, the PCI will increase by one point for at the end of the FY 31/32 to a PCI of 84.

All three scenarios maintain an overall PCI above 75, thereby preserving the City’s eligibility for the 10 percent local matching fund reduction under OCTA guidelines. It is also important to note that all three scenarios reduce the level of deferred maintenance.

8.2 Recommendations
Based on the data collected and the scenarios analyzed and presented in this report, NCE offers the following recommendations.

1. Pavement Budget - NCE recommends that the City adopt Scenario 2. This will ensure that the City’s PCI is maintained at the existing level while reducing the deferred maintenance to $170 thousand. It should be noted that this scenario will require the City to increase the funding from $34.5 million to $41.87 million.

2. Additional Funding - To address the gap between the City’s existing funding and the recommended scenario, NCE recommends the City take full advantage of all RMRA funds and actively pursue additional pavement funding sources if feasible. Some potential funding sources are listed below:

Federal Funding Sources
American Rescue Plan Act (ARPA)
Community Development Block Grants (CDBG)
Congestion Mitigation and Air Quality Improvement Program (CMAQ) Federal Emergency Management Agency (FEMA)
Highway Safety Improvement Program (HSIP)
Bipartisan Infrastructure Investment and Jobs Act (IIJA) Regional Surface Transportation Program (RSTP)
Surface Transportation Program (STP)
370
2025 Pavement Management Program Update
Conclusion and Recommendations City of San Clemente
Draft Report May 2025
23 State Funding Sources
Active Transportation Program (ATP), which now includes the Bicycle Transportation Account (BTA) and Safe Routes to Schools (SR2S)
AB 2766 (vehicle surcharge)
CalRecycle grants
State Transportation Improvement Program (STIP)
State Water Resource Control Board
Transportation Development Act (TDA)
Traffic Safety Fund
Transportation Uniform Mitigation Fee (TUMF)
Vehicle License Fees (VLF)
Local/Regional Funding Sources
Development impact fees
Flood Control Districts
General funds
Local sales tax measures
Parcel/property taxes
Pavement Cut Fee
Solid waste funds
Traffic impact fees
Traffic safety/circulation fees
Transportation mitigation fees
Transient Occupancy Taxes (TOT)
Underground impact fees
Utilities (e.g., stormwater, water, wastewater enterprise funds) Various assessment districts (lighting, maintenance, flood control, community facilities) Vehicle registration fees
Vehicle code fines

3. Pavement Maintenance Strategies - NCE recommends that the City continue prioritizing a well-funded rehabilitation program (i.e., grind and overlays) to improve pavement currently in poor condition. NCE also recommends the City considers alternative treatments to conventional overlays, such as Full-depth reclamation (FDR), Cold-in-place recycling (CIR), Cold central plant recycling (CCPR), Asphalt-rubber aggregate membrane (ARAM), Fiber reinforced asphalt concrete (FRAC), and Asphalt rubber hot mix (ARHM). While preventive maintenance remains beneficial, focusing on rehabilitation is essential to improving the overall network condition, at which point preventive maintenance will be more effective in preserving streets already in in good condition, and avoid further increases to deferred maintenance.

4. Reinspection Strategies - To continue monitoring the street network and be in compliance with OCTA Measure M2 requirements, it is recommended that MPAH streets continue to be inspected every two 371
2025 Pavement Management Program Update
Conclusion and Recommendations City of San Clemente
Draft Report May 2025
24 years and residential streets at least every six years. Please note, the City currently inspects the entire MPAH and one-third of Local Street network every 2 years.

5. M&R Decision Tree - Considering the recent volatility in oil prices and curb ramp requirements, the future cost of construction is unknown and unpredictable. NCE therefore recommends that the City annually review and update the M&R treatment strategies and associated unit costs to reflect current construction techniques and changing costs. This will ensure that the results for the budget analyses are reliable and as accurate as possible.
372
Appendix 1
Section Description Inventory – Average (Weighted by Area) PCI 373
Appendix 1-A
MPAH Network
374
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory MPAH Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 6060 AVENIDA LA PATA 010 VIA ONDA AVENIDA VISTA HERMOSA OPA A 6 2,371 96 227,616 04/26/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 80 80 6060 AVENIDA LA PATA 020 AVENIDA PICO VIA ONDA OPA A 6 693 64 44,352 02/03/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 81 81 6060 AVENIDA LA PATA 030 AVENIDA PICO CALLE AMANECER UPAO A 6 2,410 64 154,240 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 85 85 6060 AVENIDA LA PATA 040 CALLE AMANECER CALLE DEL CERRO UPAO A 4 1,150 64 73,600 11/06/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/08/2025 80 80 6060 AVENIDA LA PATA 050 CALLE DEL CERRO CALLE IGLESIA UPAO A 4 1,525 64 97,600 11/06/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/08/2025 83 83 6060 AVENIDA LA PATA 060 AVENIDA VISTA HERMOSA CALLE SALUDA UPAO A 4 2,053 64 131,392 02/03/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 75 75 6060 AVENIDA LA PATA 070 CALLE IGLESIA END UPAO A 4 2,209 80 176,720 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 84 84 6060 AVENIDA LA PATA 080 CALLE SALUDA CAMINO DEL RIO UPAO A 4 1,240 64 79,360 10/01/2023 SHALLOW PATCH 04/08/2025 87 87 6060 AVENIDA LA PATA 090 CAMINO DEL RIO CITY LIMITS UPAO A 4 4,489 64 287,296 04/26/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 91 91 510 AVENIDA PICO 030 EL CAMINO REAL N CALLE DE LOS MOLINOS UPAO A 4 2,573 68 174,964 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 86 86 510 AVENIDA PICO 040 CALLE DE LOS MOLINOS CALLE DE INDUSTRIAS UPAO O 6 460 63 28,980 01/15/2021 GRIND AND OVERLAY 04/08/2025 89 89 510 AVENIDA PICO 050 CALLE DE INDUSTRIAS AVENIDA NAVARRO UPAO A 8 253 63 15,939 04/08/2025 87 87 510 AVENIDA PICO 060 AVENIDA NAVARRO INTERSTATE #5 UPAO A 8 487 63 30,681 11/02/2024 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/08/2025 88 88 510 AVENIDA PICO 070 INTERSTATE #5 CALLE FRONTERA OPA A 7 2,284 88 200,992 04/02/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 82 82 510 AVENIDA PICO 080 AVENIDA PRESIDIO CALLE DEL CERRO OPA A 6 1,100 88 96,800 04/02/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 77 77 510 AVENIDA PICO 090 CALLE DEL CERRO CALLE AMANECER OPA A 6 2,410 88 212,080 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 80 80 510 AVENIDA PICO 100 CALLE AMANECER AVENIDA LA PATA OPA A 6 3,550 88 312,400 11/02/2024 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/08/2025 83 83 510 AVENIDA PICO 110 THE COURTYARDS AVENIDA VISTA HERMOSA OPA O 6 2,077 88 186,430 04/29/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 90 90 510 AVENIDA PICO 120 AVENIDA VISTA HERMOSA CALLE ALICANTE OPA A 6 1,495 88 131,560 04/29/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 85 85 510 AVENIDA PICO 130 CALLE ALICANTE CAMINO CELOSIA OPA A 6 2,020 88 177,760 04/11/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 83 83 510 AVENIDA PICO 140 CAMINO CELOSIA CAMINO LA PEDRIZA OPA A 6 1,649 88 145,112 04/11/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 80 80 510 AVENIDA PICO 150 CAMINO LA PEDRIZA END OPA A 2 1,550 20 31,000 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 80 80 510 AVENIDA PICO 160 AVENIDA LA PATA THE COURTYARDS OPA O 6 680 85 66,270 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 90 90 6270 AVENIDA TALEGA 010 CALLE CAMPANERO AVENIDA VISTA HERMOSA UMiA A 2 385 64 24,640 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 88 88 6270 AVENIDA TALEGA 020 AVENIDA VISTA HERMOSA CALLE PORTOFINO UMiA A 4 1,011 62 62,682 04/11/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 90 90 6270 AVENIDA TALEGA 030 CALLE PORTOFINO BRIDGE UMiA A 4 1,300 62 80,600 04/11/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 90 90 6270 AVENIDA TALEGA 040 BRIDGE CALLE CAREYES UMiA A 4 910 62 56,420 04/08/2025 88 88 6270 AVENIDA TALEGA 050 CALLE CAREYES CAMINO VIENTO FUERTE E UMiA A 4 2,202 62 136,524 01/01/2020 SLURRY SEAL 04/08/2025 88 88 6270 AVENIDA TALEGA 060 CAMINO VIENTO FUERTE E CAMINO TIERRA GRANDE UMiA A 4 2,315 62 143,530 01/01/2020 SLURRY SEAL 04/08/2025 87 87 940 AVENIDA VAQUERO 010 CAMINO CAPISTRANO VIA CASCADITA UMiA O 2 314 55 17,270 03/01/2020 GRIND AND OVERLAY 04/08/2025 88 88 940 AVENIDA VAQUERO 020 VIA CASCADITA CALLE GRANDE VISTA UMiA O 2 763 55 41,965 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 72 72 940 AVENIDA VAQUERO 030 CALLE GRANDE VISTA VIA MONTECITO UMiA O 2 270 55 14,850 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 68 68 940 AVENIDA VAQUERO 040 VIA MONTECITO CALLE VISTA TORITO UMiA O 2 560 55 30,800 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 75 75 940 AVENIDA VAQUERO 050 CALLE VISTA TORITO VIA SAN GORGONIO UMiA O 2 1,667 55 91,685 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 72 72 940 AVENIDA VAQUERO 060 VIA SAN GORGONIO CALLE ARCO UMiA O 2 285 55 15,675 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 68 68 940 AVENIDA VAQUERO 070 CALLE ARCO INTERSTATE #5 UMiA O 2 442 63 27,846 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 97 94 940 AVENIDA VAQUERO 080 INTERSTATE #5 CALLE GUADALAJARA UMiA O 2 745 55 40,975 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 99 94 940 AVENIDA VAQUERO 090 CALLE GUADALAJARA CALLE VALLARTA UMiA O 2 900 55 49,500 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 98 94 940 AVENIDA VAQUERO 100 CALLE VALLARTA CALLE VICENTE UMiA O 2 575 55 31,625 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 75 75 940 AVENIDA VAQUERO 110 CALLE VICENTE CAMINO DE LOS MARES UMiA O 3 218 55 11,990 02/01/2024 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 69 69 2930 AVENIDA VISTA HERMOSA 020 I-5 S EXIT I-5 BRIDGE UPAO A 5 270 64 17,280 04/08/2025 70 70 2930 AVENIDA VISTA HERMOSA 030 I-5 BRIDGE CALLE FRONTERA UPAO A 6 750 64 48,000 11/01/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/08/2025 75 75 2930 AVENIDA VISTA HERMOSA 040 CALLE FRONTERA AVENIDA PLATANAR UPAO A 5 391 64 25,024 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 94 94 2930 AVENIDA VISTA HERMOSA 050 AVENIDA PLATANAR CAMINO LAUREL UPAO A 4 890 64 56,960 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 89 89 2930 AVENIDA VISTA HERMOSA 060 CAMINO LAUREL VIA TURQUEZA UPAO A 4 1,967 64 125,888 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 89 89 2930 AVENIDA VISTA HERMOSA 070 VIA TURQUEZA CAMINO VERA CRUZ UPAO O 4 1,817 64 116,288 05/03/2025 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 91 97 2930 AVENIDA VISTA HERMOSA 080 CAMINO VERA CRUZ AVENIDA LA PATA UPAO A 4 4,993 64 319,552 05/02/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 85 85 2930 AVENIDA VISTA HERMOSA 090 AVENIDA LA PATA BRIDGE UPAO A 4 366 64 23,424 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/08/2025 75 75 2930 AVENIDA VISTA HERMOSA 100 BRIDGE VIA SUERTE UPAO A 4 510 64 32,640 04/03/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 85 85 2930 AVENIDA VISTA HERMOSA 110 VIA SUERTE AVENIDA TALEGA UPAO A 4 734 64 46,976 04/03/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 84 84 2930 AVENIDA VISTA HERMOSA 120 AVENIDA TALEGA VIA MARFINO UPAO A 4 662 64 42,368 04/08/2025 85 85 2930 AVENIDA VISTA HERMOSA 130 VIA MARFINO CAMINO LA PEDRIZA UPAO A 4 1,180 64 75,520 04/11/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 84 84 2930 AVENIDA VISTA HERMOSA 140 CAMINO LA PEDRIZA AVENIDA PICO UPAO A 4 918 64 58,752 04/08/2025 82 82 UPAO - Urban Principal Arterial-Other, UMiA - Urban Minor Arterial, OPA - OPA - Other Principal Arterial A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete 1 of 4 5/22/2025 375
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory MPAH Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 2930 AVENIDA VISTA HERMOSA 160 I-5 S EXIT 77 PARK ACCESS ROAD UPAO A 5 520 103 53,560 03/07/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 71 71 2930 AVENIDA VISTA HERMOSA 170 PARK ACCESS ROAD AVENIDA COSTA AZUL UPAO A 4 730 80 58,400 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 82 82 2930 AVENIDA VISTA HERMOSA 180 BRIDGE VIA CANON VERDE UPAO A 4 800 80 64,000 07/31/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 90 90 2930 AVENIDA VISTA HERMOSA 190 VIA CANON VERDE AVENIDA PICO UPAO A 4 820 80 65,600 10/14/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 91 91 3810 CAMINO CAPISTRANO 010 DEL GADO RD VIA BREVE UMiA A 2 711 40 28,440 04/01/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 86 86 3810 CAMINO CAPISTRANO 020 VIA BREVE MONTE VISTA UMiA A 3 511 40 20,440 01/01/2020 SLURRY SEAL 04/08/2025 81 81 3810 CAMINO CAPISTRANO 030 MONTE VISTA AVENIDA VAQUERO UMiA A 2 1,230 65 79,950 04/01/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 82 82 3810 CAMINO CAPISTRANO 040 AVENIDA VAQUERO PACIFIC COAST HWY UMiA A 2 607 65 39,455 03/17/2025 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/08/2025 81 81 3790 CAMINO DE ESTRELLA 010 CALLE HERMOSA CAMINO MIRA COSTA UPAO A 4 785 78 57,850 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 82 82 3790 CAMINO DE ESTRELLA 020 CAMINO MIRA COSTA INTERSTATE #5 BRIDGE UPAO A 4 1,010 80 80,035 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 83 83 3790 CAMINO DE ESTRELLA 030 INTERSTATE #5 BRIDGE CALLE NARANJA UPAO A 6 365 70 32,640 01/01/2020 SLURRY SEAL 04/08/2025 89 89 2050 CAMINO DE LOS MARES 010 CALLE NARANJA CAMINO EL MOLINO UPAO O 6 350 70 27,130 04/05/2021 GRIND AND OVERLAY 04/08/2025 87 87 2050 CAMINO DE LOS MARES 011 CAMINO EL MOLINO CALLE AGUA UPAO O 6 725 70 49,760 04/05/2021 GRIND AND OVERLAY 04/08/2025 91 91 2050 CAMINO DE LOS MARES 012 CALLE AGUA MARBELLA UPAO O 6 1,820 70 148,245 04/05/2021 GRIND AND OVERLAY 04/08/2025 89 89 2050 CAMINO DE LOS MARES 013 MARBELLA AVENIDA VAQUERO UPAO O 6 1,065 70 94,680 04/05/2021 GRIND AND OVERLAY 04/08/2025 87 87 2050 CAMINO DE LOS MARES 015 AVENIDA VAQUERO CALLE NUEVO UMiA A 4 3,138 60 197,694 10/01/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/08/2025 87 87 2050 CAMINO DE LOS MARES 020 CALLE NUEVO PORTICO DEL SUR UMiA O 4 1,436 60 86,160 03/07/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 87 87 2050 CAMINO DE LOS MARES 030 PORTICO DEL SUR CAMINO VERA CRUZ UMiA O 4 979 60 58,740 06/13/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 89 89 2050 CAMINO DE LOS MARES 040 CAMINO VERA CRUZ ESTANCIA UMiA A 2 1,245 63 78,435 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 75 75 2050 CAMINO DE LOS MARES 050 ESTANCIA BONANZA UMiA A 2 1,041 63 65,583 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 79 79 2050 CAMINO DE LOS MARES 060 BONANZA PORTICO DEL NORTE UMiA A 2 1,513 63 95,319 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 82 82 2050 CAMINO DE LOS MARES 070 PORTICO DEL NORTE CITY LIMIT UMiA A 2 340 63 21,420 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 71 71 6570 CAMINO DEL RIO 010 CAMINO DE LOS MARES BRILLANTE UMiA A 2 450 64 28,800 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 86 86 6570 CAMINO DEL RIO 020 BRILLANTE VIA TULIPAN UMiA A 2 262 64 16,768 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 91 91 6570 CAMINO DEL RIO 030 VIA TULIPAN LEGENDARIO UMiA A 2 580 64 37,120 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 89 89 6570 CAMINO DEL RIO 040 LEGENDARIO CALLE SARMENTOSO UMiA A 2 808 64 51,712 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 85 85 6570 CAMINO DEL RIO 050 CALLE SARMENTOSO CALLE PRECIPICIO UMiA A 2 2,145 60 128,700 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 87 87 6570 CAMINO DEL RIO 060 CALLE PRECIPICIO AVENIDA LA PATA UMiA A 2 1,880 60 112,800 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 91 91 3660 CAMINO MIRA COSTA 010 CAMINO DE ESTRELLA CALLE GUAYMAS UMiA A 2 1,437 63 90,531 01/01/2020 SLURRY SEAL 04/08/2025 83 83 3660 CAMINO MIRA COSTA 020 CALLE GUAYMAS CALLE BORREGO UMiA A 2 489 63 30,807 01/01/2020 SLURRY SEAL 04/08/2025 81 81 3660 CAMINO MIRA COSTA 030 CALLE BORREGO CAMINO ALONDRA UMiA A 2 469 63 29,547 01/01/2020 SLURRY SEAL 04/08/2025 79 79 3660 CAMINO MIRA COSTA 040 CAMINO ALONDRA CALLE LA VETA UMiA A 2 567 63 35,721 01/01/2020 SLURRY SEAL 04/08/2025 82 82 3660 CAMINO MIRA COSTA 050 CALLE LA VETA CAMINO CAPISTRANO UMiA A 2 738 63 46,494 01/01/2020 SLURRY SEAL 04/08/2025 81 81 2660 CAMINO VERA CRUZ 010 CAMINO DE LOS MARES CALLE HERALDO UMiA A 5 438 64 28,032 06/13/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 84 84 2660 CAMINO VERA CRUZ 020 CALLE HERALDO RIACHUELO UMiA A 4 918 64 58,752 10/18/2020 SLURRY SEAL 04/08/2025 87 87 2660 CAMINO VERA CRUZ 030 RIACHUELO CALLE SARMENTOSO UMiA A 4 840 64 53,760 10/18/2020 SLURRY SEAL 04/08/2025 88 88 2660 CAMINO VERA CRUZ 040 CALLE SARMENTOSO COSTA UMiA A 4 851 64 54,464 10/18/2020 SLURRY SEAL 04/08/2025 90 90 2660 CAMINO VERA CRUZ 050 COSTA BELLO PANORAMA UMiA A 4 450 64 28,800 10/18/2020 SLURRY SEAL 04/08/2025 89 89 2660 CAMINO VERA CRUZ 060 BELLO PANORAMA VIA BLANCO UMiA A 4 680 64 43,520 02/03/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 88 88 2660 CAMINO VERA CRUZ 070 VIA BLANCO CARRETERA UMiA A 4 751 64 48,064 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/08/2025 85 85 2660 CAMINO VERA CRUZ 080 CARRETERA AVENIDA VISTA HERMOSA UMiA A 4 2,423 64 155,072 10/01/2023 SHALLOW PATCH 04/08/2025 86 86 2660 CAMINO VERA CRUZ 090 AVENIDA VISTA HERMOSA CALLE AQUAMARINA UMiA O 2 459 64 29,376 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/08/2025 90 90 2660 CAMINO VERA CRUZ 100 CALLE AQUAMARINA CALLE PARADISO UMiA O 2 1,423 64 91,072 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 89 89 2660 CAMINO VERA CRUZ 110 CALLE PARADISO VIA PACIFICA UMiA O 2 290 64 18,560 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/08/2025 91 91 2660 CAMINO VERA CRUZ 120 VIA PACIFICA AVENIDA PICO UMiA O 2 1,268 64 81,152 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/08/2025 88 88 950 EL CAMINO REAL N 010 CAMINO CAPISTRANO CAMINO SAN CLEMENTE UMiA O 4 850 70 59,500 11/01/2022 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/08/2025 88 88 950 EL CAMINO REAL N 020 CAMINO SAN CLEMENTE AVENIDA ESTACION UMiA O 2 4,050 66 267,300 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 90 90 950 EL CAMINO REAL N 030 AVENIDA ESTACION AVENIDA PICO UMiA O 5 622 66 41,052 04/08/2025 82 82 950 EL CAMINO REAL N 040 AVENIDA PICO BOCA DE LA PLAYA UMiA O 5 397 56 22,232 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 78 78 950 EL CAMINO REAL N 050 BOCA DE LA PLAYA CALLE LAGO UMiA O 4 116 56 4,648 04/08/2025 82 82 950 EL CAMINO REAL N 060 CALLE LAGO CALLE DE LOS MOLINOS UMiA O 4 595 56 33,320 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 04/08/2025 89 89 950 EL CAMINO REAL N 070 CALLE DE LOS MOLINOS AVENIDA FLORENCIA UMiA O 4 535 56 29,960 04/08/2025 89 89 950 EL CAMINO REAL N 080 AVENIDA FLORENCIA AVENIDA DE LA GRULLA UMiA O 4 738 56 41,328 04/08/2025 87 87 UPAO - Urban Principal Arterial-Other, UMiA - Urban Minor Arterial, OPA - OPA - Other Principal Arterial A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete 2 of 4 5/22/2025 376
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory MPAH Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 950 EL CAMINO REAL N 090 AVENIDA DE LA GRULLA CALLE VALLE UMiA O 4 335 56 18,760 04/08/2025 89 89 950 EL CAMINO REAL N 100 CALLE VALLE AVENIDA ARAGON UMiA O 4 357 56 19,992 04/08/2025 86 86 950 EL CAMINO REAL N 110 AVENIDA ARAGON EL PORTAL W UMiA O 4 306 56 17,136 04/08/2025 87 87 950 EL CAMINO REAL N 120 EL PORTAL W AVENIDA DEL PONIENTE UMiA O 4 117 56 6,552 04/08/2025 89 89 950 EL CAMINO REAL N 140 AVENIDA DEL PONIENTE CANADA W UMiA O 4 285 56 15,960 04/08/2025 87 87 950 EL CAMINO REAL N 150 CANADA W ESCALONES W UMiA O 4 293 56 16,408 04/08/2025 89 89 950 EL CAMINO REAL N 160 ESCALONES W MARIPOSA W UMiA O 4 208 56 11,648 04/08/2025 87 87 950 EL CAMINO REAL N 170 MARIPOSA W MARIPOSA E UMiA O 4 50 56 2,800 04/08/2025 86 86 950 EL CAMINO REAL N 180 MARIPOSA E MARQUITA W UMiA O 4 190 56 10,640 04/08/2025 88 88 950 EL CAMINO REAL N 190 MARIPOSA W MARQUITA E UMiA O 4 107 56 5,992 04/08/2025 90 90 950 EL CAMINO REAL N 200 MARQUITA E AVENIDA PALIZADA W UMiA O 4 447 56 31,584 04/08/2025 83 83 950 EL CAMINO REAL N 210 AVENIDA PALIZADA W AVENIDA MIRAMAR UMiA O 4 450 56 25,200 04/08/2025 84 84 950 EL CAMINO REAL N 220 AVENIDA MIRAMAR AVENIDA SERRA UMiA O 4 265 56 14,840 04/08/2025 81 81 950 EL CAMINO REAL N 230 AVENIDA SERRA AVENIDA CABRILLO UMiA O 4 240 56 13,440 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 82 82 950 EL CAMINO REAL N 240 AVENIDA CABRILLO AVENIDA DEL MAR UMiA O 4 275 56 15,400 04/08/2025 79 79 3820 EL CAMINO REAL S 010 AVENIDA DEL MAR AVENIDA GRANADA UMiA O 4 285 56 15,960 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 75 75 3820 EL CAMINO REAL S 020 AVENIDA GRANADA AVENIDA VICTORIA UMiA O 4 253 56 14,168 04/08/2025 88 88 3820 EL CAMINO REAL S 030 AVENIDA VICTORIA AVENIDA PRESIDIO UMiA O 5 182 56 10,192 04/08/2025 90 90 3820 EL CAMINO REAL S 040 AVENIDA PRESIDIO AVENIDA ROSA UMiA O 5 93 56 5,208 04/08/2025 87 87 3820 EL CAMINO REAL S 050 AVENIDA ROSA AVENIDA MATEO UMiA O 4 253 56 14,168 04/08/2025 81 81 3820 EL CAMINO REAL S 060 AVENIDA MATEO AVENIDA ALGODON UMiA O 4 290 56 16,240 04/08/2025 80 80 3820 EL CAMINO REAL S 070 AVENIDA ALGODON TRAFALGAR LN UMiA O 4 345 56 19,320 04/08/2025 83 83 3820 EL CAMINO REAL S 080 TRAFALGAR LN AVENIDA CADIZ W UMiA O 4 300 56 16,800 04/08/2025 81 81 3820 EL CAMINO REAL S 090 AVENIDA CADIZ W AVENIDA BARCELONA UMiA O 4 265 56 14,840 04/08/2025 80 80 3820 EL CAMINO REAL S 100 AVENIDA BARCELONA ESPLANADE UMiA O 5 305 56 17,080 04/08/2025 82 82 3820 EL CAMINO REAL S 110 ESPLANADE AVENIDA SANTIAGO W UMiA O 4 285 56 15,960 04/08/2025 84 84 3820 EL CAMINO REAL S 120 AVENIDA SANTIAGO W PASEO DE CRISTOBAL W UMiA O 4 235 56 13,160 04/08/2025 85 85 3820 EL CAMINO REAL S 130 PASEO DE CRISTOBAL W AVENIDA CORDOBA W UMiA O 4 250 56 14,000 04/08/2025 86 86 3820 EL CAMINO REAL S 140 AVENIDA CORDOBA W AVENIDA GAVIOTA W UMiA O 4 238 56 13,328 04/08/2025 80 80 3820 EL CAMINO REAL S 150 AVENIDA GAVIOTA W AVENIDA VALENCIA W UMiA O 4 237 56 13,272 04/08/2025 58 58 3820 EL CAMINO REAL S 160 AVENIDA VALENCIA W INTERSTATE #5 UMiA O 5 430 56 24,080 07/23/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/08/2025 62 62 3820 EL CAMINO REAL S 170 INTERSTATE #5 AVENIDA SAN JUAN E UMiA O 5 406 56 22,736 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 04/08/2025 48 48 3820 EL CAMINO REAL S 180 AVENIDA SAN JUAN E AVENIDA SAN ANTONIO W UMiA O 4 195 56 10,920 04/08/2025 61 61 3820 EL CAMINO REAL S 190 AVENIDA SAN ANTONIO W AVENIDA SAN ANTONIO E UMiA O 4 105 56 5,880 04/08/2025 88 88 3820 EL CAMINO REAL S 200 AVENIDA SAN ANTONIO E AVENIDA RAMONA W UMiA O 4 200 56 11,200 04/08/2025 89 89 3820 EL CAMINO REAL S 210 AVENIDA RAMONA W AVENIDA CORNELIO W UMiA O 4 262 56 14,672 04/08/2025 87 87 3820 EL CAMINO REAL S 220 AVENIDA CORNELIO W AVENIDA JUNIPERO W UMiA O 4 328 56 18,368 04/08/2025 89 89 3820 EL CAMINO REAL S 230 AVENIDA JUNIPERO W AVENIDA SAN PABLO UMiA O 4 162 56 9,072 04/08/2025 89 89 3820 EL CAMINO REAL S 240 AVENIDA SAN PABLO AVENIDA SAN GABRIEL W UMiA O 4 199 56 11,144 04/08/2025 87 87 3820 EL CAMINO REAL S 250 AVENIDA SAN GABRIEL W AVENIDA SAN GABRIEL E UMiA O 5 201 56 11,256 04/08/2025 88 88 3820 EL CAMINO REAL S 260 AVENIDA SAN GABRIEL E INTERSTATE #5 UMiA O 5 650 56 36,400 04/08/2025 89 89 3820 EL CAMINO REAL S 270 INTERSTATE #5 AVENIDA MENDOCINO UMiA O 5 425 56 23,800 04/08/2025 86 86 3820 EL CAMINO REAL S 280 AVENIDA MENDOCINO AVENIDA MAGDALENA E UMiA O 5 785 56 43,960 04/08/2025 62 62 3820 EL CAMINO REAL S 290 AVENIDA MAGDALENA E CALLE DEL COMERCIO UMiA O 4 320 56 17,920 04/08/2025 67 67 3820 EL CAMINO REAL S 300 CALLE DEL COMERCIO AVENIDA SAN LUIS REY UMiA O 4 1,435 56 80,360 04/08/2025 66 66 3820 EL CAMINO REAL S 310 AVENIDA SAN LUIS REY AVENIDA SANTA INEZ UMiA O 4 260 56 14,560 04/08/2025 57 57 3820 EL CAMINO REAL S 320 AVENIDA SANTA INEZ AVENIDA DOMINGUEZ UMiA O 4 245 56 13,720 04/08/2025 67 67 3820 EL CAMINO REAL S 330 AVENIDA DOMINGUEZ AVENIDA SAN DIMAS UMiA O 4 255 56 14,280 04/08/2025 68 68 3820 EL CAMINO REAL S 340 AVENIDA SAN DIMAS AVENIDA SAN FERNANDO UMiA O 4 240 56 13,440 04/08/2025 70 70 3820 EL CAMINO REAL S 350 AVENIDA SAN FERNANDO AVENIDA BUENA VENTURA UMiA O 4 260 56 14,560 04/08/2025 67 67 3820 EL CAMINO REAL S 360 AVENIDA BUENA VENTURA AVENIDA DOLORES UMiA O 4 250 56 14,000 04/08/2025 70 70 3820 EL CAMINO REAL S 370 AVENIDA DOLORES AVENIDA SAN DIEGO UMiA O 4 270 56 15,120 04/08/2025 58 58 3820 EL CAMINO REAL S 380 AVENIDA SAN DIEGO AVENIDA LUCIA UMiA O 4 250 56 14,000 04/08/2025 54 54 UPAO - Urban Principal Arterial-Other, UMiA - Urban Minor Arterial, OPA - OPA - Other Principal Arterial A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete 3 of 4 5/22/2025 377
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory MPAH Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3820 EL CAMINO REAL S 390 AVENIDA LUCIA AVENIDA CARMELO UMiA O 4 250 56 14,000 04/08/2025 68 68 3820 EL CAMINO REAL S 400 AVENIDA CARMELO AVENIDA PALA UMiA O 4 246 56 13,776 04/08/2025 65 65 3820 EL CAMINO REAL S 410 AVENIDA PALA AVENIDA SANTA MARGARITA UMiA O 4 249 56 13,944 04/08/2025 58 58 3820 EL CAMINO REAL S 420 AVENIDA SANTA MARGARITA CITY LIMIT UMiA O 4 410 56 59,360 04/08/2025 55 55 UPAO - Urban Principal Arterial-Other, UMiA - Urban Minor Arterial, OPA - OPA - Other Principal Arterial A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete 4 of 4 5/22/2025 378
Appendix 1-B
Local Network
379
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 2470 ACANTILADO 010 END CALLE VALLARTA R O 2 210 36 7,560 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 94 3400 ACEBO LN 010 AVENIDA DEL MAR CALLE SEVILLE S R A 2 559 30 16,770 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 93 92 1660 AFLORAMIENTO 010 END INCLINADO R A 2 404 40 16,160 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 83 3370 ALAMEDA LN 010 AVENIDA DEL MAR AVENIDA DEL MAR R A 2 556 30 16,680 02/21/2023 77 74 3370 ALAMEDA LN 020 AVENIDA DEL MAR MONTEREY LN R A 2 501 30 15,030 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 88 1630 ALDEANO 010 END ALTURA R A 2 212 40 8,480 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 1810 ALFORJA 010 END BONANZA R A 2 581 39 22,659 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 87 87 1620 ALTURA 010 SOMBREADO ALDEANO R A 2 1,444 40 57,760 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 85 85 1620 ALTURA 020 ALDEANO INCLINADO R A 2 466 40 18,640 02/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 89 89 2185 ARBOLADO 010 CAMINO VERA CRUZ END R A 2 580 32 18,560 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 87 87 1320 ARDILLA LN 010 CALLE GOMEZ CALLE DEL RITO R A 2 248 39 9,672 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 90 89 1320 ARDILLA LN 020 CALLE DEL RITO AVENIDA MAGDALENA E R A 2 172 39 6,708 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 87 88 3566 ARENOSO LN 010 END AVENIDA PALIZADA W R A 2 450 29 13,050 02/21/2023 85 81 1890 ARREOS 010 END VACUNO R A 2 334 39 13,026 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1890 ARREOS 020 VACUNO DOMADOR R A 2 772 39 30,108 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 4280 ARRIBA LINDA 010 CERRITO CIELO END R O 2 298 35 10,400 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 77 85 2130 ARROYO 010 END CALLE HERALDO R A 2 824 39 32,136 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 4050 AVENIDA ACAPULCO 010 AVENIDA SAN PABLO AVENIDA ADOBE (S) R A 2 527 40 21,080 11/21/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 98 90 4050 AVENIDA ACAPULCO 020 AVENIDA ADOBE (S) AVENIDA ADOBE (N) R A 2 892 40 35,680 11/21/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 99 88 4050 AVENIDA ACAPULCO 030 AVENIDA ADOBE (N) VIA CISCO R A 2 575 40 23,000 06/01/2020 SLURRY SEAL 10/05/2020 99 85 4050 AVENIDA ACAPULCO 040 VIA CISCO AVENIDA DEL VERDOR R A 2 755 40 30,200 06/01/2020 SLURRY SEAL 10/05/2020 99 85 4050 AVENIDA ACAPULCO 050 AVENIDA DEL VERDOR VIA FLORIDA R A 2 828 40 33,120 06/01/2020 SLURRY SEAL 10/05/2020 99 85 4050 AVENIDA ACAPULCO 060 VIA FLORIDA VIA PROMONTORIO R A 2 67 40 2,680 10/05/2020 97 85 4050 AVENIDA ACAPULCO 070 VIA PROMONTORIO VIA DESEO R A 2 358 40 14,320 06/01/2020 SLURRY SEAL 10/05/2020 99 85 4050 AVENIDA ACAPULCO 080 VIA DESEO AVENIDA SAN PABLO R A 2 1,582 40 63,280 12/04/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 99 88 2990 AVENIDA ALESSANDRO W 010 AVENIDA SAN ANTONIO W OLA VISTA S R A 2 972 23 22,356 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 56 66 2990 AVENIDA ALESSANDRO W 020 OLA VISTA S AVENIDA DEL PRESIDENTE R A 2 1,243 23 28,589 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 90 90 3180 AVENIDA ALGODON 010 AVENIDA MONTEREY EL CAMINO REAL S R A 2 700 39 27,300 02/21/2023 57 52 1985 AVENIDA AMADIS 010 AVENIDA ESPLANADIAN AVENIDA DEL PRESIDENTE R A 2 279 32 8,928 02/21/2023 59 55 280 AVENIDA ARAGON 010 BUENA VISTA CALLE PUENTE R A 2 1,126 39 43,914 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 83 80 280 AVENIDA ARAGON 020 CALLE PUENTE EL PRADO R A 2 443 39 17,277 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 94 89 280 AVENIDA ARAGON 030 EL PRADO AVENIDA PELAYO R A 2 423 39 16,497 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 92 87 280 AVENIDA ARAGON 040 AVENIDA PELAYO EL CAMINO REAL N R A 2 238 39 9,282 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 94 89 4470 AVENIDA ARLENA 010 END AVENIDA ARLENA R A 2 87 35 4,746 10/05/2020 59 47 4470 AVENIDA ARLENA 020 END LA ESPERANZA S R A 2 203 33 6,699 10/05/2020 98 85 4470 AVENIDA ARLENA 030 LA ESPERANZA S AVENIDA CORDOBA E R A 2 1,185 33 39,105 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 10/05/2020 70 69 3270 AVENIDA BARCELONA 010 ESPLANADE OLA VISTA S R A 2 925 39 36,075 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 90 84 3270 AVENIDA BARCELONA 020 OLA VISTA S EL CAMINO REAL S R O 2 1,475 39 57,525 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 95 91 4555 AVENIDA BUENA SUERTE 010 AVENIDA CORDOBA E AVENIDA BUENA SUERTE R A 2 405 35 14,175 10/05/2020 97 85 4555 AVENIDA BUENA SUERTE 020 LA ESPERANZA S VISTA CAYENTA R A 2 616 35 21,560 10/05/2020 99 85 4555 AVENIDA BUENA SUERTE 030 VISTA CAYENTA AVENIDA SAN JUAN E R A 2 349 35 12,215 10/05/2020 99 85 1450 AVENIDA BUENA VENTURA 010 EL CAMINO REAL S AVENIDA SAN LUIS REY R A 2 1,129 34 38,386 10/05/2020 97 85 5120 AVENIDA CABALLEROS 010 EL ORIENTE AVENIDA PALIZADA W R A 2 616 33 20,328 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 68 70 5120 AVENIDA CABALLEROS 020 AVENIDA PALIZADA W AVENIDA DE LA PAZ R A 2 429 32 13,728 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 76 91 3500 AVENIDA CABRILLO 010 AVENIDA PALIZADA W CALLE SEVILLE N R A 2 837 24 20,088 02/21/2023 69 66 3500 AVENIDA CABRILLO 020 Y INTERSECTION AVENIDA PALIZADA W R A 2 175 24 4,200 02/21/2023 67 62 3500 AVENIDA CABRILLO 030 CALLE SEVILLE N OLA VISTA N R A 2 1,116 40 44,640 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 63 71 3500 AVENIDA CABRILLO 040 OLA VISTA N EL CAMINO REAL N R A 2 1,017 40 40,680 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 57 71 3500 AVENIDA CABRILLO 050 EL CAMINO REAL N AVENIDA DE LA ESTRELLA R A 2 177 20 3,540 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 72 77 3260 AVENIDA CADIZ W 010 OLA VISTA S EL CAMINO REAL S R A 2 1,485 29 43,065 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 94 92 1865 AVENIDA CALAFIA 010 BEACH PARK ENTRANCE AVENIDA MONTALVO R O 2 1,075 39 41,925 10/01/2023 11CSC - MILL AND FILL (0.35' - 0.45') - 5% - 10% 02/21/2023 70 71 1865 AVENIDA CALAFIA 020 OLA VISTA S AVENIDA DEL PRESIDENTE R O 2 370 39 14,430 10/01/2023 11CSC - MILL AND FILL (0.35' - 0.45') - 5% - 10% 02/21/2023 77 77 1420 AVENIDA CARMELO 010 EL CAMINO REAL S AVENIDA SANTA MARGARITA R A 2 497 34 16,898 10/05/2020 93 84 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 1 of 20 5/22/2025 380
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 4850 AVENIDA COLUMBO 010 AVENIDA TERESA AVENIDA SALVADOR R A 2 274 33 9,042 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 78 84 4850 AVENIDA COLUMBO 020 AVENIDA SALVADOR END R A 2 740 33 24,420 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 64 69 4560 AVENIDA CORDOBA E 010 CALLE ALCAZAR LADERA LN R A 2 303 32 9,696 10/05/2020 76 68 4560 AVENIDA CORDOBA E 020 LADERA LN VIA AVILA R A 2 232 32 7,424 11/01/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 10/05/2020 65 63 4560 AVENIDA CORDOBA E 030 VIA AVILA VIA LA JOLLA R A 2 765 32 24,480 10/05/2020 71 64 4560 AVENIDA CORDOBA E 040 VIA LA JOLLA VIA CATALINA R A 2 200 32 6,400 10/05/2020 72 64 4560 AVENIDA CORDOBA E 050 VIA CATALINA VIA LA MESA R A 2 222 32 7,104 10/05/2020 67 56 4560 AVENIDA CORDOBA E 060 VIA LA MESA LA ESPERANZA S R A 2 418 32 13,376 10/05/2020 67 60 4560 AVENIDA CORDOBA E 070 AVENIDA ARLENA LA ESPERANZA S R A 2 1,350 32 43,200 05/28/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 65 74 3160 AVENIDA CORDOBA W 010 CALLE TOLEDO OLA VISTA S R A 2 983 29 28,507 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 89 90 3160 AVENIDA CORDOBA W 020 OLA VISTA S EL CAMINO REAL S R A 2 1,034 29 29,986 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 90 90 4230 AVENIDA CORNELIO E 020 EL CAMINO REAL S END R A 2 702 29 20,358 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 57 72 42300 AVENIDA CORNELIO W 010 END EL CAMINO REAL S R A 2 520 29 15,080 10/05/2020 60 51 42300 AVENIDA CORNELIO W 030 OLA VISTA S AVENIDA DEL PRESIDENTE R O 2 1,175 29 34,075 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 92 92 6670 AVENIDA COSTA AZUL 010 AVENIDA VISTA HERMOSA VIA CANARIAS R A 2 556 36 26,366 04/07/2025 91 91 6670 AVENIDA COSTA AZUL 020 VIA CANARIAS VIA ESCORIAL R A 2 405 36 15,080 04/07/2025 91 91 1250 AVENIDA COSTANSO 010 END AVENIDA COTA R A 2 963 21 20,223 10/05/2020 90 82 1240 AVENIDA COTA 010 AVENIDA SANTA MARGARITA AVENIDA COSTANSO R A 2 267 31 8,277 10/05/2020 90 82 1240 AVENIDA COTA 020 AVENIDA COSTANSO BEND R A 2 825 21 17,325 10/05/2020 89 85 1240 AVENIDA COTA 030 BEND END R A 2 322 21 17,346 10/05/2020 90 82 2940 AVENIDA CRESPI 010 AVENIDA MAGDALENA E CALLE GOMEZ R A 2 1,434 25 35,850 03/07/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 92 86 3777 AVENIDA DE LA ESTRELLA 010 CALLE DE LOS MOLINOS AVENIDA SIERRA R A 2 960 40 38,400 04/25/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 89 88 3777 AVENIDA DE LA ESTRELLA 020 AVENIDA SIERRA CALLE REDONDEL R A 2 241 40 9,640 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 79 75 3777 AVENIDA DE LA ESTRELLA 030 CALLE REDONDEL CALLE REDONDEL R A 2 222 40 8,880 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 82 76 3777 AVENIDA DE LA ESTRELLA 040 CALLE REDONDEL LA PLACENTIA R A 2 1,042 40 41,680 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 83 79 3777 AVENIDA DE LA ESTRELLA 050 LA PLACENTIA EL PORTAL E R A 2 886 40 35,440 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 95 89 3777 AVENIDA DE LA ESTRELLA 060 EL PORTAL E ESCALONES E R A 2 70 40 2,800 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 86 83 3777 AVENIDA DE LA ESTRELLA 070 ESCALONES E EL ORIENTE R A 2 132 40 5,280 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 87 3777 AVENIDA DE LA ESTRELLA 080 EL ORIENTE MARIPOSA E R A 2 138 40 5,520 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 87 3777 AVENIDA DE LA ESTRELLA 090 MARIPOSA E MARQUITA E R A 2 255 40 10,200 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 86 84 3777 AVENIDA DE LA ESTRELLA 100 MARQUITA E AVENIDA PALIZADA W R A 2 345 40 13,800 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 89 87 3777 AVENIDA DE LA ESTRELLA 110 AVENIDA PALIZADA W AVENIDA CABRILLO R A 2 1,056 39 41,184 03/07/2025 18CSC - MILL AND FILL (0.50') - Water Patch Repair 02/21/2023 91 94 3777 AVENIDA DE LA ESTRELLA 120 AVENIDA CABRILLO AVENIDA PRESIDIO R A 2 862 39 33,618 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 91 91 270 AVENIDA DE LA GRULLA 010 AVENIDA FLORENCIA AVENIDA DEL REPOSO R A 2 260 40 10,400 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 89 86 270 AVENIDA DE LA GRULLA 020 AVENIDA DEL REPOSO CALLE PUENTE R A 2 405 40 16,200 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 87 270 AVENIDA DE LA GRULLA 030 CALLE PUENTE EL CAMINO REAL N R A 2 905 40 36,200 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 89 5115 AVENIDA DE LA PAZ 010 SOLANO EL ORIENTE R A 2 850 35 29,750 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 70 74 5115 AVENIDA DE LA PAZ 020 EL ORIENTE LA ESPERANZA N R A 2 1,490 35 52,150 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 73 88 1760 AVENIDA DE LA RIVIERA 010 END CALLE CAPRI R A 2 200 49 9,800 02/21/2023 76 73 1760 AVENIDA DE LA RIVIERA 020 CALLE CAPRI CALLE MADIERA R A 2 157 49 7,693 02/21/2023 76 73 1760 AVENIDA DE LA RIVIERA 030 CALLE MADIERA CALLE MONACO R A 2 116 49 5,684 02/21/2023 75 71 1760 AVENIDA DE LA RIVIERA 040 CALLE MONACO CALLE MONTE CARLO R A 2 142 49 6,958 02/21/2023 72 68 1760 AVENIDA DE LA RIVIERA 050 CALLE MONTE CARLO CALLE LAS PALMAS R A 2 119 49 5,831 02/21/2023 72 68 1760 AVENIDA DE LA RIVIERA 060 CALLE LAS PALMAS CALLE MAJORCA R A 2 190 49 9,310 02/21/2023 74 70 1760 AVENIDA DE LA RIVIERA 070 CALLE MAJORCA OLA VISTA S R A 2 297 49 14,553 02/21/2023 74 69 4340 AVENIDA DE LOS LOBOS MARINOS E 010 CALLE ALCAZAR END R A 2 457 20 9,140 07/30/2024 18CSC - MILL AND FILL (0.50') - Water Patch Repair 10/05/2020 71 73 3094 AVENIDA DE LOS LOBOS MARINOS W 010 CALLE DE LOS ALAMOS CALLE LASUEN R A 2 867 40 34,680 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 84 80 3094 AVENIDA DE LOS LOBOS MARINOS W 020 CALLE LASUEN CALLE ROCA VISTA R A 2 215 40 8,600 01/05/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 83 79 3094 AVENIDA DE LOS LOBOS MARINOS W 030 CALLE ROCA VISTA CALLE SERENA R A 2 380 40 15,200 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 88 3094 AVENIDA DE LOS LOBOS MARINOS W 040 CALLE SERENA OLA VISTA S R A 2 320 40 12,800 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 83 81 3094 AVENIDA DE LOS LOBOS MARINOS W 050 OLA VISTA S AVENIDA DEL PRESIDENTE R O 2 1,518 40 60,720 05/01/2020 GRIND AND OVERLAY 02/21/2023 91 88 3450 AVENIDA DEL MAR 010 CORONADO LN ALAMEDA LN R A 2 267 40 10,680 02/21/2023 58 53 3450 AVENIDA DEL MAR 020 ALAMEDA LN SANTA ANA LN R A 2 103 39 4,017 02/21/2023 56 51 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 2 of 20 5/22/2025 381
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3450 AVENIDA DEL MAR 030 SANTA ANA LN AVENIDA SANTA BARBARA R A 2 122 30 3,660 02/21/2023 50 45 3450 AVENIDA DEL MAR 040 AVENIDA SANTA BARBARA ALAMEDA LN R A 2 151 39 5,889 02/21/2023 52 47 3450 AVENIDA DEL MAR 050 ALAMEDA LN ACEBO LN R A 2 109 39 4,251 04/18/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 59 62 3450 AVENIDA DEL MAR 060 ACEBO LN AVENIDA GRANADA R A 2 288 40 12,200 02/21/2023 62 58 3450 AVENIDA DEL MAR 070 AVENIDA GRANADA CALLE SEVILLE N R A 2 520 40 20,800 04/18/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 59 62 3450 AVENIDA DEL MAR 080 CALLE SEVILLE N OLA VISTA N R A 2 1,180 59 69,620 04/18/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 58 61 3450 AVENIDA DEL MAR 090 OLA VISTA N EL CAMINO REAL S R A 2 914 59 53,926 02/21/2023 57 52 210 AVENIDA DEL PONIENTE 010 BUENA VISTA EL PORTAL W R A 2 790 33 26,070 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 85 82 210 AVENIDA DEL PONIENTE 020 EL PORTAL W CANADA W R A 2 300 33 9,900 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 88 85 210 AVENIDA DEL PONIENTE 030 AVENIDA DEL PONIENTE CALLE PUENTE R A 2 223 40 8,920 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 89 87 210 AVENIDA DEL PONIENTE 040 CALLE PUENTE EL PRADO R A 2 422 33 13,926 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 89 87 210 AVENIDA DEL PONIENTE 050 EL PRADO EL CAMINO REAL N R A 2 727 33 23,991 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 89 86 3030 AVENIDA DEL PRESIDENTE 010 AVENIDA VALENCIA W AVENIDA PRINCESA R A 2 218 53 11,554 02/21/2023 80 76 3030 AVENIDA DEL PRESIDENTE 020 AVENIDA PRINCESA AVENIDA DE LOS LOBOS MARINOS W R A 2 292 40 11,680 02/21/2023 89 86 3030 AVENIDA DEL PRESIDENTE 030 AVENIDA DE LOS LOBOS MARINOS W AVENIDA SAN ANTONIO W R A 2 282 40 11,280 02/21/2023 87 84 3030 AVENIDA DEL PRESIDENTE 040 AVENIDA SAN ANTONIO W AVENIDA ALESSANDRO W R A 2 423 32 13,536 02/21/2023 93 89 3030 AVENIDA DEL PRESIDENTE 050 AVENIDA ALESSANDRO W AVENIDA RAMONA W R A 2 230 32 7,360 02/21/2023 94 90 3030 AVENIDA DEL PRESIDENTE 060 AVENIDA RAMONA W AVENIDA CORNELIO W R A 2 280 32 8,960 02/21/2023 81 76 3030 AVENIDA DEL PRESIDENTE 070 AVENIDA CORNELIO W AVENIDA JUNIPERO W R A 2 400 32 12,800 02/21/2023 90 86 3030 AVENIDA DEL PRESIDENTE 080 AVENIDA JUNIPERO W AVENIDA MENDOCINO R A 2 880 32 28,160 02/21/2023 93 89 3030 AVENIDA DEL PRESIDENTE 090 AVENIDA MENDOCINO AVENIDA MAGDALENA W R A 2 762 48 36,576 02/21/2023 94 91 3030 AVENIDA DEL PRESIDENTE 100 AVENIDA MAGDALENA W AVENIDA CALAFIA R A 2 263 48 12,624 02/21/2023 89 86 3030 AVENIDA DEL PRESIDENTE 110 AVENIDA CALAFIA AVENIDA SAN LUIS REY R A 2 1,595 48 76,560 02/21/2023 89 86 3030 AVENIDA DEL PRESIDENTE 120 AVENIDA SAN LUIS REY AVENIDA VISTA DEL OCEANO R A 2 2,305 48 110,640 11/01/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 02/21/2023 85 83 3030 AVENIDA DEL PRESIDENTE 130 AVENIDA VISTA DEL OCEANO AVENIDA DE LAS PALMERAS R A 2 920 48 44,160 02/21/2023 91 87 3030 AVENIDA DEL PRESIDENTE 140 AVENIDA DE LAS PALMERAS CITY LIMIT R A 2 745 48 35,760 02/21/2023 84 80 260 AVENIDA DEL REPOSO 010 AVENIDA DE LA GRULLA CALLE MIRADOR R A 2 929 32 29,728 12/05/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 87 92 1570 AVENIDA DOLORES 010 EL CAMINO REAL S AVENIDA SANTA MARGARITA R A 2 1,061 54 57,294 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 89 88 1480 AVENIDA DOMINGUEZ 010 EL CAMINO REAL S AVENIDA SAN LUIS REY R A 2 780 31 24,180 10/05/2020 92 86 330 AVENIDA ESTACION 010 EL CAMINO REAL N CALLE DESHECHA R A 2 265 63 16,695 05/01/2020 SLURRY SEAL 02/21/2023 58 53 330 AVENIDA ESTACION 020 CALLE DESHECHA END R A 2 723 63 45,549 05/01/2020 SLURRY SEAL 02/21/2023 68 63 300 AVENIDA FLORENCIA 010 AVENIDA PELAYO AVENIDA DE LA GRULLA R A 2 265 40 10,600 02/21/2023 77 73 300 AVENIDA FLORENCIA 020 AVENIDA DE LA GRULLA CALLE SACRAMENTO R A 2 380 40 15,200 10/05/2020 97 85 300 AVENIDA FLORENCIA 030 CALLE SACRAMENTO AVENIDA HACIENDA R A 2 190 40 7,600 10/05/2020 96 85 300 AVENIDA FLORENCIA 040 AVENIDA HACIENDA CALLE LAS BOLAS R A 2 233 40 9,320 02/21/2023 68 64 300 AVENIDA FLORENCIA 050 CALLE LAS BOLAS CALLE MIRADOR R A 2 352 40 14,080 02/21/2023 87 83 300 AVENIDA FLORENCIA 060 CALLE MIRADOR EL CAMINO REAL N R A 2 171 40 6,840 02/21/2023 86 82 3130 AVENIDA GAVIOTA W 010 AVENIDA VALENCIA W CALLE TOLEDO R A 2 724 28 20,272 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 83 87 3130 AVENIDA GAVIOTA W 020 CALLE TOLEDO OLA VISTA S R A 2 945 28 26,460 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 89 91 3130 AVENIDA GAVIOTA W 030 OLA VISTA S EL CAMINO REAL S R A 2 933 29 27,057 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 91 91 3410 AVENIDA GRANADA 010 AVENIDA DEL MAR AVENIDA CABRILLO R A 2 587 40 23,480 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 81 3410 AVENIDA GRANADA 020 AVENIDA DEL MAR CALLE SEVILLE S R A 2 495 40 19,800 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 83 86 3410 AVENIDA GRANADA 030 CALLE SEVILLE S OLA VISTA N R A 2 1,391 40 55,640 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 83 86 3410 AVENIDA GRANADA 040 OLA VISTA N EL CAMINO REAL S R A 2 854 40 34,160 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 84 88 370 AVENIDA HACIENDA 010 CALLE SACRAMENTO AVENIDA FLORENCIA R A 2 550 35 19,250 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 85 86 4240 AVENIDA JUNIPERO E 010 EL CAMINO REAL S AVENIDA TRIESTE R A 2 622 29 18,038 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 44 75 4240 AVENIDA JUNIPERO E 020 AVENIDA TRIESTE ENTRADA PARAISO R A 2 493 29 14,297 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 45 76 4200 AVENIDA JUNIPERO W 010 OLA VISTA S AVENIDA DEL PRESIDENTE R O 2 1,057 29 30,653 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 94 88 4200 AVENIDA JUNIPERO W 020 END EL CAMINO REAL S R A 2 549 29 15,921 10/05/2020 66 58 1720 AVENIDA LA COSTA 010 PLAZA A LA PLAYA CALLE MONTE CRISTO R A 2 709 39 27,651 02/21/2023 73 69 1720 AVENIDA LA COSTA 020 CALLE MONTE CRISTO CALLE MONACO R A 2 324 35 11,340 02/21/2023 77 73 1720 AVENIDA LA COSTA 030 CALLE MONACO CALLE LAS PALMAS R A 2 282 35 9,870 02/21/2023 77 73 5110 AVENIDA LA CUESTA 010 SOLANO CALLE EMPALME R A 2 159 32 5,088 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 76 77 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 3 of 20 5/22/2025 382
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 5110 AVENIDA LA CUESTA 020 CALLE EMPALME PATERO DEL ORO R A 2 1,232 32 39,424 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 76 89 5110 AVENIDA LA CUESTA 030 PATERO DEL ORO CALLE BELLA LOMA R O 2 417 32 13,344 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 92 5110 AVENIDA LA CUESTA 040 CALLE BELLA LOMA CALLE SEGURO R O 2 87 32 2,784 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 87 92 5110 AVENIDA LA CUESTA 050 CALLE SEGURO CALLE MIGUEL R A 2 846 32 27,072 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 77 89 3487 AVENIDA LOBEIRO 010 AVENIDA MONTALVO AVENIDA MONTALVO R A 2 1,765 29 51,185 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 68 79 3705 AVENIDA LOS FLORES 010 AVENIDA SIERRA EL ORIENTE R A 2 500 39 19,500 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 88 3705 AVENIDA LOS FLORES 020 EL ORIENTE END R A 2 136 39 5,304 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 94 92 1410 AVENIDA LUCIA 010 EL CAMINO REAL S AVENIDA SANTA MARGARITA R A 2 679 34 23,086 10/05/2020 93 84 3452 AVENIDA MADRID 010 AVENIDA VICTORIA OLA VISTA S R O 2 574 40 22,960 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 93 3452 AVENIDA MADRID 020 OLA VISTA S AVENIDA MONTEREY R A 2 516 40 20,640 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 84 1350 AVENIDA MAGDALENA E 010 EL CAMINO REAL S LOS BAUTISMOS LN R A 2 834 60 50,040 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 80 94 1350 AVENIDA MAGDALENA E 020 LOS BAUTISMOS LN AVENIDA CRESPI R A 2 560 40 22,400 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 82 91 1350 AVENIDA MAGDALENA E 030 AVENIDA CRESPI AVENIDA ORTEGA R A 2 256 40 10,240 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 87 95 1350 AVENIDA MAGDALENA E 040 AVENIDA ORTEGA AVENIDA SANTA MARGARITA R A 2 225 40 9,000 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 68 84 1350 AVENIDA MAGDALENA E 050 AVENIDA SANTA MARGARITA CALLE GOMEZ R A 2 460 40 18,400 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 93 88 1350 AVENIDA MAGDALENA E 060 CALLE GOMEZ ARDILLA LN R A 2 654 21 13,734 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 90 88 1350 AVENIDA MAGDALENA E 070 AVENIDA MAGDALENA E CALLE DEL CERRITO R A 2 481 20 9,620 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 91 88 1355 AVENIDA MAGDALENA W 010 OLA VISTA S AVENIDA DEL PRESIDENTE R A 2 204 35 7,120 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 64 72 3190 AVENIDA MATEO 010 AVENIDA MONTEREY EL CAMINO REAL S R A 2 607 40 24,280 01/23/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 68 75 1590 AVENIDA MENDOCINO 010 AVENIDA DEL PRESIDENTE EL CAMINO REAL S R O 2 333 35 11,622 02/21/2023 63 59 3625 AVENIDA MIRAMAR 010 AVENIDA PALIZADA W OLA VISTA N R A 2 813 39 31,707 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 89 3625 AVENIDA MIRAMAR 020 OLA VISTA N EL CAMINO REAL N R A 2 859 39 33,501 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 84 3482 AVENIDA MONTALVO 010 AVENIDA LOBEIRO AVENIDA LOBEIRO R A 2 1,384 28 38,752 10/02/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 02/21/2023 71 75 3482 AVENIDA MONTALVO 020 AVENIDA LOBEIRO AVENIDA CALAFIA R A 2 394 28 11,032 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 73 77 3440 AVENIDA MONTEREY 010 AVENIDA VICTORIA OLA VISTA S R A 2 552 40 22,080 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 80 3440 AVENIDA MONTEREY 020 OLA VISTA S AVENIDA MADRID R A 2 332 36 16,412 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 77 81 3440 AVENIDA MONTEREY 030 AVENIDA MADRID AVENIDA ALGODON R A 2 790 40 31,600 02/20/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 78 88 3440 AVENIDA MONTEREY 040 AVENIDA ALGODON AVENIDA MATEO R A 2 141 40 5,640 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 71 80 3440 AVENIDA MONTEREY 050 AVENIDA MATEO AVENIDA ROSA R A 2 250 40 10,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 70 76 450 AVENIDA NAVARRO 010 CALLE DE LOS MOLINOS AVENIDA PICO R O 2 759 32 24,288 01/15/2021 GRIND AND OVERLAY 04/07/2025 96 95 1360 AVENIDA ORTEGA 010 AVENIDA MAGDALENA E CALLE GOMEZ R A 2 394 31 12,214 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 86 88 1430 AVENIDA PALA 010 EL CAMINO REAL S AVENIDA SANTA MARGARITA R A 2 332 24 7,968 10/05/2020 94 85 5070 AVENIDA PALIZADA E 010 EL CAMINO REAL N AVENIDA DE LA ESTRELLA R A 2 192 40 7,680 02/21/2023 69 66 5070 AVENIDA PALIZADA E 020 AVENIDA DE LA ESTRELLA I-5 SB EXIT RAMP R A 2 579 63 36,477 10/05/2020 77 69 3564 AVENIDA PALIZADA W 010 AVENIDA CABRILLO ARENOSO LN R A 2 205 40 8,200 02/21/2023 70 67 3564 AVENIDA PALIZADA W 020 ARENOSO LN ENCINO LN R A 2 567 40 22,680 02/21/2023 69 66 3564 AVENIDA PALIZADA W 030 ENCINO LN AVENIDA SERRA R A 2 400 40 16,000 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 85 81 3564 AVENIDA PALIZADA W 040 AVENIDA SERRA AVENIDA MIRAMAR R A 2 301 40 12,040 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 86 3564 AVENIDA PALIZADA W 050 AVENIDA MIRAMAR LOMA LN R A 2 410 40 16,400 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 85 82 3564 AVENIDA PALIZADA W 060 LOMA LN OLA VISTA N R A 2 449 40 17,960 10/01/2023 11CSC - MILL AND FILL (0.35' - 0.45') - 5% - 10% 02/21/2023 76 76 3564 AVENIDA PALIZADA W 070 OLA VISTA N LOMA LN R A 2 446 40 17,840 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 82 86 3564 AVENIDA PALIZADA W 080 LOMA LN EL CAMINO REAL N R A 2 309 40 12,360 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 79 290 AVENIDA PELAYO 010 BUENA VISTA AVENIDA FLORENCIA R A 2 163 40 6,520 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 89 92 290 AVENIDA PELAYO 020 AVENIDA FLORENCIA CALLE PUENTE R A 2 908 40 36,320 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 90 90 290 AVENIDA PELAYO 030 CALLE PUENTE AVENIDA ARAGON R A 2 1,051 40 42,040 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 91 91 510 AVENIDA PICO 010 BOCA DE LA PLAYA CALLE DESHECHA R A 2 300 49 14,700 02/21/2023 75 70 510 AVENIDA PICO 020 CALLE DESHECHA EL CAMINO REAL N R A 2 145 49 7,105 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 02/21/2023 75 75 5025 AVENIDA PIZARRO 010 LA ESPERANZA N EL LEVANTE R A 2 639 23 14,697 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 74 90 5125 AVENIDA PRESIDIO 010 EL CAMINO REAL S AVENIDA DE LA ESTRELLA R A 2 182 52 9,464 02/21/2023 91 87 5125 AVENIDA PRESIDIO 020 AVENIDA DE LA ESTRELLA INTERSTATE #5 R A 2 200 46 9,200 10/05/2020 98 85 5125 AVENIDA PRESIDIO 030 INTERSTATE #5 LA ESPERANZA S R A 2 385 46 17,710 10/05/2020 98 85 5125 AVENIDA PRESIDIO 040 AVENIDA PICO AVENIDA PRESIDIO R O 2 1,483 39 57,837 07/31/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 82 89 5125 AVENIDA PRESIDIO 050 AVENIDA PRESIDIO CALLE ESCUELA R O 2 313 39 12,207 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 91 88 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 4 of 20 5/22/2025 383
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 5125 AVENIDA PRESIDIO 060 CALLE ESCUELA CALLE MIGUEL R O 2 449 39 17,511 10/05/2020 92 84 5125 AVENIDA PRESIDIO 070 CALLE MIGUEL CALLE EMPALME R A 2 150 39 5,850 06/25/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 87 83 5125 AVENIDA PRESIDIO 080 CALLE EMPALME CALLE FIESTA R A 2 191 39 7,449 05/01/2020 SLURRY SEAL 10/05/2020 84 77 5125 AVENIDA PRESIDIO 090 CALLE FIESTA CALLE NEBLINA R A 2 150 39 5,850 05/01/2020 SLURRY SEAL 10/05/2020 96 85 5125 AVENIDA PRESIDIO 100 CALLE NEBLINA CALLE PUEBLO R A 2 176 39 6,864 10/05/2020 96 85 5125 AVENIDA PRESIDIO 110 CALLE PUEBLO CALLE PUEBLO R A 2 101 39 3,939 05/01/2020 SLURRY SEAL 10/05/2020 98 85 5125 AVENIDA PRESIDIO 120 CALLE PUEBLO CALLE FAMILIA R A 2 237 39 9,243 05/01/2020 SLURRY SEAL 10/05/2020 80 75 5125 AVENIDA PRESIDIO 130 CALLE FAMILIA CALLE VILLARIO R A 2 137 39 5,343 05/01/2020 SLURRY SEAL 10/05/2020 98 85 5125 AVENIDA PRESIDIO 140 CALLE VILLARIO CALLE DELICADA R A 2 182 39 7,098 06/26/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 98 88 5125 AVENIDA PRESIDIO 150 CALLE DELICADA CALLE FELICIDAD R A 2 169 39 6,591 05/01/2020 SLURRY SEAL 10/05/2020 98 85 5125 AVENIDA PRESIDIO 160 CALLE FELICIDAD CALLE PESCADOR R A 2 137 39 5,343 05/01/2020 SLURRY SEAL 10/05/2020 97 85 5125 AVENIDA PRESIDIO 170 CALLE PESCADOR CALLE DORADO R A 2 265 39 10,335 05/01/2020 SLURRY SEAL 10/05/2020 97 85 5125 AVENIDA PRESIDIO 180 CALLE DORADO CALLE MENDOZA R A 2 1,185 39 46,215 05/01/2020 SLURRY SEAL 10/05/2020 97 85 5125 AVENIDA PRESIDIO 190 CALLE MENDOZA AVENIDA SALVADOR R A 2 285 39 11,115 05/01/2020 SLURRY SEAL 10/05/2020 97 85 5125 AVENIDA PRESIDIO 200 AVENIDA SALVADOR CALLE MIGUEL R A 2 864 39 33,696 10/05/2020 96 85 5125 AVENIDA PRESIDIO 210 CALLE MIGUEL AVENIDA SAN CARLOS R A 2 296 39 11,544 10/05/2020 98 85 5125 AVENIDA PRESIDIO 220 AVENIDA SAN CARLOS CALLE DE SOTO R A 2 626 39 24,414 10/05/2020 97 85 5125 AVENIDA PRESIDIO 230 CALLE DE SOTO CALLE SONORA R A 2 139 39 5,421 10/05/2020 98 85 5125 AVENIDA PRESIDIO 240 CALLE SONORA CALLE DE ANZA R A 2 295 39 11,505 10/05/2020 93 84 5125 AVENIDA PRESIDIO 250 CALLE DE ANZA CALLE CORTEZ R A 2 300 39 11,700 10/05/2020 97 85 5125 AVENIDA PRESIDIO 260 CALLE CORTEZ LA ESPERANZA N R O 2 1,561 39 60,879 10/05/2020 95 86 3045 AVENIDA PRINCESA 010 AVENIDA VALENCIA W OLA VISTA S R O 2 920 29 26,680 05/01/2020 GRIND AND OVERLAY 02/21/2023 90 87 3075 AVENIDA PRINCESA 020 OLA VISTA S AVENIDA DEL PRESIDENTE R O 2 1,100 24 26,400 05/01/2020 GRIND AND OVERLAY 02/21/2023 89 85 4260 AVENIDA RAMONA E 010 OLA VISTA S AVENIDA DEL PRESIDENTE R A 2 1,209 23 27,807 02/21/2023 76 72 4260 AVENIDA RAMONA E 020 END EL CAMINO REAL S R A 2 478 39 18,642 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 73 4260 AVENIDA RAMONA E 030 EL CAMINO REAL S ENTRADA PARAISO R A 2 827 29 23,983 10/05/2020 83 76 4260 AVENIDA RAMONA E 040 ENTRADA PARAISO END R A 2 710 29 20,590 10/05/2020 68 58 3430 AVENIDA ROSA 010 AVENIDA VICTORIA OLA VISTA S R A 2 255 23 7,452 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 96 89 3430 AVENIDA ROSA 020 OLA VISTA S OLA VISTA S R O 2 721 40 28,840 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 88 85 3430 AVENIDA ROSA 030 OLA VISTA S AVENIDA MONTEREY R O 2 260 40 10,400 11/01/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 02/21/2023 89 86 3430 AVENIDA ROSA 040 AVENIDA MONTEREY EL CAMINO REAL S R O 2 575 40 23,000 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 90 86 4840 AVENIDA SALVADOR 010 AVENIDA PRESIDIO CALLE DE SOTO R A 2 456 39 17,784 10/05/2020 95 85 4840 AVENIDA SALVADOR 020 CALLE DE SOTO AVENIDA TERESA R A 2 322 39 12,558 10/05/2020 96 85 4840 AVENIDA SALVADOR 030 AVENIDA TERESA AVENIDA COLUMBO R A 2 502 39 19,578 10/05/2020 96 85 4840 AVENIDA SALVADOR 040 AVENIDA COLUMBO CALLE MALAGUENA R A 2 1,121 39 43,719 10/05/2020 90 82 4840 AVENIDA SALVADOR 050 CALLE MALAGUENA CALLE TIBIDABO R A 2 330 39 12,870 10/05/2020 62 53 4840 AVENIDA SALVADOR 060 CALLE TIBIDABO CALLE MONSERRAT R A 2 216 39 8,424 10/05/2020 65 56 4840 AVENIDA SALVADOR 070 CALLE MONSERRAT VISTA VALINDA R A 2 1,359 39 53,001 10/05/2020 69 62 4840 AVENIDA SALVADOR 080 VISTA VALINDA AVENIDA SAN JUAN E R A 2 1,982 39 77,298 10/05/2020 71 63 4840 AVENIDA SALVADOR 090 AVENIDA SAN JUAN E AVENIDA SAN PABLO R A 2 3,077 39 120,003 01/28/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 72 70 4220 AVENIDA SAN ANTONIO E 010 EL CAMINO REAL S END R A 2 323 26 8,398 03/26/2025 18CSC - MILL AND FILL (0.50') - Water Patch Repair 10/05/2020 73 87 2975 AVENIDA SAN ANTONIO W 010 AVENIDA ALESSANDRO W OLA VISTA S R A 2 1,010 23 23,230 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 63 70 2975 AVENIDA SAN ANTONIO W 020 OLA VISTA S AVENIDA DEL PRESIDENTE R A 2 1,523 39 59,397 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 87 2975 AVENIDA SAN ANTONIO W 030 END EL CAMINO REAL S R A 2 167 39 6,513 10/05/2020 49 38 4940 AVENIDA SAN CARLOS 010 EL LEVANTE CALLE CORTEZ R A 2 269 33 8,877 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 62 76 4940 AVENIDA SAN CARLOS 020 CALLE CORTEZ CALLE DE ANZA R A 2 341 33 11,253 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 66 75 4940 AVENIDA SAN CARLOS 030 CALLE DE ANZA CALLE SONORA R A 2 328 33 10,824 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 75 85 4940 AVENIDA SAN CARLOS 040 CALLE SONORA AVENIDA PRESIDIO R A 2 306 33 10,098 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 68 78 1400 AVENIDA SAN DIEGO 010 EL CAMINO REAL S AVENIDA SANTA MARGARITA R A 2 915 34 31,110 10/05/2020 90 82 1470 AVENIDA SAN DIMAS 010 EL CAMINO REAL S AVENIDA SAN LUIS REY R A 2 900 30 27,000 10/05/2020 96 85 1460 AVENIDA SAN FERNANDO 010 EL CAMINO REAL S AVENIDA SAN LUIS REY R A 2 1,017 28 28,069 10/05/2020 93 84 3840 AVENIDA SAN GABRIEL E 010 EL CAMINO REAL S AVENIDA SAN PABLO R A 2 675 39 26,325 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 69 79 3840 AVENIDA SAN GABRIEL E 020 AVENIDA SAN PABLO END R A 2 422 33 13,926 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 63 83 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 5 of 20 5/22/2025 384
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 4190 AVENIDA SAN GABRIEL W 010 END EL CAMINO REAL S R A 2 599 24 14,376 10/05/2020 74 68 4380 AVENIDA SAN JUAN E 010 EL CAMINO REAL S CALLE ALCAZAR R A 2 178 29 5,162 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 73 4380 AVENIDA SAN JUAN E 020 CALLE ALCAZAR ENTRADA PARAISO R A 2 504 29 14,616 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 74 77 4380 AVENIDA SAN JUAN E 030 ENTRADA PARAISO CALLE MARIA R A 2 395 29 11,455 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 74 77 4380 AVENIDA SAN JUAN E 040 CALLE MARIA CALLE LETICIA R A 2 258 29 7,482 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 92 89 4380 AVENIDA SAN JUAN E 050 CALLE LETICIA CALLE MAYITA R A 2 317 29 9,193 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 88 86 4380 AVENIDA SAN JUAN E 060 CALLE MAYITA AVENIDA BUENA SUERTE R A 2 1,181 29 34,249 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 85 85 4380 AVENIDA SAN JUAN E 070 AVENIDA BUENA SUERTE LA CIMA R A 2 667 29 19,343 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 81 4380 AVENIDA SAN JUAN E 080 LA CIMA AVENIDA SALVADOR R A 2 204 29 5,916 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 77 77 1530 AVENIDA SAN LUIS REY 010 AVENIDA DEL PRESIDENTE EL CAMINO REAL S R P 2 215 34 7,310 02/04/2021 91 89 1530 AVENIDA SAN LUIS REY 020 EL CAMINO REAL S CALLE DEL COMERCIO R A 2 174 34 5,916 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 91 1530 AVENIDA SAN LUIS REY 030 CALLE DEL COMERCIO AVENIDA SANTA INEZ R A 2 683 27 18,441 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 91 1530 AVENIDA SAN LUIS REY 040 AVENIDA SANTA INEZ AVENIDA DOMINGUEZ R A 2 275 27 7,425 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 89 1530 AVENIDA SAN LUIS REY 050 AVENIDA DOMINGUEZ AVENIDA SAN DIMAS R A 2 275 27 7,425 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 87 91 1530 AVENIDA SAN LUIS REY 060 AVENIDA SAN DIMAS AVENIDA SAN FERNANDO R A 2 269 27 7,263 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 89 92 1530 AVENIDA SAN LUIS REY 070 AVENIDA SAN FERNANDO AVENIDA BUENA VENTURA R A 2 266 27 7,182 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 67 85 1530 AVENIDA SAN LUIS REY 080 AVENIDA BUENA VENTURA AVENIDA SANTA MARGARITA R A 2 244 35 8,516 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 84 91 4140 AVENIDA SAN PABLO 010 AVENIDA SAN GABRIEL E EL CAMINO REAL S R A 2 736 29 21,050 10/05/2020 86 79 4140 AVENIDA SAN PABLO 020 AVENIDA SAN GABRIEL E CALLE LA SERNA R A 2 507 36 18,252 01/28/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 97 88 4140 AVENIDA SAN PABLO 030 CALLE LA SERNA AVENIDA SALVADOR R A 2 203 36 7,308 01/28/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 97 88 4140 AVENIDA SAN PABLO 035 AVENIDA SALVADOR CALLE CUERVO S R A 2 1,086 36 39,096 11/21/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 95 90 4140 AVENIDA SAN PABLO 040 CALLE CUERVO S CALLE CUERVO N R A 2 610 62 37,820 06/01/2020 SLURRY SEAL 10/05/2020 99 85 4140 AVENIDA SAN PABLO 050 CALLE CUERVO N VIA ENSUENO R A 2 372 62 23,064 11/21/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 99 88 4140 AVENIDA SAN PABLO 060 VIA ENSUENO VIA COLIBRI R A 2 400 62 24,800 11/21/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 98 88 4140 AVENIDA SAN PABLO 070 VIA COLIBRI VIA MIMOSA R A 2 738 62 45,756 12/04/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 98 90 4140 AVENIDA SAN PABLO 080 VIA MIMOSA AVENIDA BUENOS AIRES R A 2 186 62 11,532 08/09/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 96 88 4140 AVENIDA SAN PABLO 090 AVENIDA BUENOS AIRES VIA DELFIN R A 2 155 62 9,610 05/01/2020 SLURRY SEAL 10/05/2020 99 85 4140 AVENIDA SAN PABLO 100 VIA DELFIN AVENIDA ACAPULCO R A 2 935 62 57,970 12/04/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 98 92 4140 AVENIDA SAN PABLO 110 AVENIDA ACAPULCO END R A 2 225 62 13,950 12/04/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 98 88 3392 AVENIDA SANTA BARBARA 010 AVENIDA DEL MAR CALLE SEVILLE S R A 2 851 39 33,189 02/21/2023 64 60 3392 AVENIDA SANTA BARBARA 020 CALLE SEVILLE S OLA VISTA S R A 2 553 39 21,567 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 79 3392 AVENIDA SANTA BARBARA 030 OLA VISTA S AVENIDA ROSA R A 2 1,010 39 39,390 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 90 92 1490 AVENIDA SANTA INEZ 010 EL CAMINO REAL S AVENIDA SAN LUIS REY R A 2 667 34 22,678 10/05/2020 95 85 1440 AVENIDA SANTA MARGARITA 010 EL CAMINO REAL S AVENIDA PALA R A 2 463 34 15,742 01/04/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 82 87 1440 AVENIDA SANTA MARGARITA 020 AVENIDA PALA AVENIDA CARMELO R A 2 300 34 10,200 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 89 88 1440 AVENIDA SANTA MARGARITA 030 AVENIDA CARMELO AVENIDA LUCIA R A 2 317 24 7,608 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 89 88 1440 AVENIDA SANTA MARGARITA 040 AVENIDA LUCIA AVENIDA SAN DIEGO R A 2 299 24 7,176 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 88 88 1440 AVENIDA SANTA MARGARITA 050 AVENIDA SAN DIEGO AVENIDA DOLORES R A 2 334 24 8,016 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 89 88 1440 AVENIDA SANTA MARGARITA 060 AVENIDA SAN LUIS REY AVENIDA COTA R A 2 1,095 32 35,040 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 81 85 1440 AVENIDA SANTA MARGARITA 070 AVENIDA COTA CALLE BAHIA R A 2 1,148 32 36,736 08/05/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 77 87 1440 AVENIDA SANTA MARGARITA 080 CALLE BAHIA AVENIDA MAGDALENA E R A 2 340 32 10,880 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 77 84 1440 AVENIDA SANTA MARGARITA 090 AVENIDA DOLORES AVENIDA SAN LUIS REY R A 2 177 24 4,248 10/05/2020 90 82 3220 AVENIDA SANTIAGO W 010 OLA VISTA S EL CAMINO REAL S R A 2 1,231 29 35,699 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 83 3490 AVENIDA SERRA 010 AVENIDA PALIZADA W OLA VISTA N R A 2 930 40 37,200 09/27/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 02/21/2023 89 87 3490 AVENIDA SERRA 020 OLA VISTA N EL CAMINO REAL N R A 2 938 40 37,520 11/02/2023 18CSC - MILL AND FILL (0.50') - Water Patch Repair 02/21/2023 89 87 3700 AVENIDA SIERRA 010 AVENIDA DE LA ESTRELLA LA PLACENTIA R A 2 1,305 40 52,200 03/28/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 94 95 3700 AVENIDA SIERRA 020 LA PLACENTIA CALLE CAMPO R A 2 344 40 13,760 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 92 3700 AVENIDA SIERRA 030 CALLE CAMPO AVENIDA LOS FLORES R A 2 488 40 19,520 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 93 94 4860 AVENIDA TERESA 010 AVENIDA SALVADOR AVENIDA COLUMBO R A 2 857 33 28,281 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 77 80 4860 AVENIDA TERESA 020 AVENIDA COLUMBO END R A 2 483 33 15,939 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 75 78 3830 AVENIDA TRIESTE 010 AVENIDA JUNIPERO E END R A 2 377 30 11,310 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 57 80 3140 AVENIDA VALENCIA W 010 AVENIDA GAVIOTA W CALLE DE LOS ALAMOS R A 2 412 28 11,536 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 86 83 3140 AVENIDA VALENCIA W 020 CALLE DE LOS ALAMOS CALLE TOLEDO R A 2 332 28 9,296 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 92 93 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 6 of 20 5/22/2025 385
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3140 AVENIDA VALENCIA W 030 CALLE TOLEDO OLA VISTA S R A 2 995 40 39,800 05/01/2020 SLURRY SEAL 02/21/2023 70 66 3140 AVENIDA VALENCIA W 040 OLA VISTA S AVENIDA DEL PRESIDENTE R A 2 852 40 34,080 06/27/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 70 71 3140 AVENIDA VALENCIA W 050 AVENIDA DEL PRESIDENTE EL CAMINO REAL S R A 2 247 52 12,844 02/21/2023 62 58 4390 AVENIDA VERDE 010 CALLE ALCAZAR END R A 2 140 29 4,060 05/01/2020 SLURRY SEAL 10/05/2020 94 85 4400 AVENIDA VERDE 010 CALLE ALCAZAR END R A 2 210 29 6,090 10/05/2020 86 79 3420 AVENIDA VICTORIA 010 AVENIDA DEL MAR MONTEREY LN R A 2 570 40 22,800 02/21/2023 57 52 3420 AVENIDA VICTORIA 020 MONTEREY LN CAZADOR LN R A 2 451 40 18,040 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 02/21/2023 75 76 3420 AVENIDA VICTORIA 030 CAZADOR LN CORONA LN R A 2 457 40 18,280 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 69 75 3420 AVENIDA VICTORIA 040 CORONA LN AVENIDA MADRID R A 2 220 40 8,800 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 63 70 3420 AVENIDA VICTORIA 060 AVENIDA MADRID AVENIDA MONTEREY R A 2 239 40 9,560 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 61 69 3420 AVENIDA VICTORIA 070 AVENIDA MONTEREY AVENIDA SANTA BARBARA R A 2 343 40 13,720 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 56 66 3420 AVENIDA VICTORIA 080 AVENIDA SANTA BARBARA AVENIDA ROSA R A 2 350 40 14,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 70 75 3420 AVENIDA VICTORIA 090 AVENIDA ROSA OLA VISTA N R A 2 1,002 40 40,080 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 65 71 3420 AVENIDA VICTORIA 100 OLA VISTA S EL CAMINO REAL S R A 2 795 40 31,800 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 68 74 2930 AVENIDA VISTA HERMOSA 150 AVENIDA PICO PUERTA DEL SOL R A 2 518 64 33,152 04/07/2025 86 86 5960 AVENIDA VISTA MONTANA 010 CALLE DEL CERRO CALLE AGUILA R O 2 1,900 44 83,600 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 89 92 5960 AVENIDA VISTA MONTANA 020 CALLE AGUILA CALLE PASTADERO R O 2 3,150 44 138,600 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 82 93 5960 AVENIDA VISTA MONTANA 030 CALLE PASTADERO CALLE DEL CERRO R A 2 3,267 44 143,748 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 73 82 2060 BELLO PANORAMA 010 CAMINO VERA CRUZ END R A 2 667 32 21,344 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 360 BOCA DE LA PLAYA 010 END AVENIDA PICO R A 2 315 40 12,600 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 88 84 360 BOCA DE LA PLAYA 020 AVENIDA PICO CALLE LAS BOLAS R A 2 215 40 8,600 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 88 360 BOCA DE LA PLAYA 030 CALLE LAS BOLAS EL CAMINO REAL N R A 2 232 40 9,280 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 78 1840 BONANZA 010 CABALLISTA DEL NORTE REBANO R A 2 1,080 40 43,200 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 89 89 1840 BONANZA 020 REBANO ALFORJA R A 2 535 40 21,400 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 87 87 1840 BONANZA 030 ALFORJA CABALLISTA DEL SUR R A 2 255 40 10,200 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 85 85 1840 BONANZA 040 CABALLISTA DEL SUR ESTRIBO R A 2 218 40 8,720 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 88 88 1840 BONANZA 050 ESTRIBO CAMINO DE LOS MARES R A 2 414 40 16,560 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/07/2025 87 87 170 BUENA VISTA 010 END CALLE COLINA R A 2 266 28 7,448 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 91 91 170 BUENA VISTA 020 CALLE COLINA DIJE CT R A 2 593 28 16,604 01/06/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 85 89 170 BUENA VISTA 030 DIJE CT AVENIDA PELAYO R A 2 345 28 9,660 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 87 89 170 BUENA VISTA 040 AVENIDA PELAYO AVENIDA ARAGON R A 2 292 40 11,680 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 92 94 170 BUENA VISTA 050 AVENIDA ARAGON EL PORTAL W R A 2 199 40 7,960 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 91 91 170 BUENA VISTA 060 EL PORTAL W AVENIDA DEL PONIENTE R A 2 444 40 17,760 01/06/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 88 89 170 BUENA VISTA 070 AVENIDA DEL PONIENTE CANADA W R A 2 347 40 13,880 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 90 91 170 BUENA VISTA 080 CANADA W END R A 2 173 40 6,920 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 96 96 1830 CABALLISTA DEL NORTE 010 PORTICO DEL NORTE BONANZA R A 2 168 40 6,720 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 93 93 1830 CABALLISTA DEL NORTE 020 BONANZA JINETE R A 2 402 40 16,080 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 87 87 1830 CABALLISTA DEL NORTE 030 JINETE ESTANCIA R A 2 232 40 9,280 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 93 93 1830 CABALLISTA DEL NORTE 040 ESTANCIA VACUNO R A 2 523 40 20,920 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1830 CABALLISTA DEL NORTE 050 VACUNO BONANZA R A 2 326 40 13,040 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 1680 CADENA 010 END ESTAMPIDA R A 2 448 40 17,920 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 76 76 1040 CALLE ABRIL 010 CALLE BIENVENIDO VIA SACRAMENTO R A 2 583 32 18,656 10/01/2023 11CSC - MILL AND FILL (0.35' - 0.45') - 5% - 10% 04/07/2025 90 90 1040 CALLE ABRIL 020 VIA SACRAMENTO CALLE MONTEREY R A 2 802 32 25,664 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1040 CALLE ABRIL 030 CALLE MONTEREY CALLE REAL R A 2 1,770 32 56,640 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1330 CALLE AGUA 010 CAMINO DE LOS MARES CALLE LA QUINTA R A 2 322 40 12,880 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1330 CALLE AGUA 020 CALLE LA QUINTA CALLE VERANO R A 2 468 36 16,848 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 87 87 1330 CALLE AGUA 030 CALLE VERANO GATE R A 2 800 36 28,800 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 83 83 4660 CALLE AGUILA 010 AVENIDA VISTA MONTANA CALLE PASTADERO R A 2 1,599 44 70,356 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 93 87 4565 CALLE ALCAZAR 010 END AVENIDA CORDOBA E R A 2 339 32 10,848 10/05/2020 72 66 4565 CALLE ALCAZAR 020 AVENIDA CORDOBA E AVENIDA VERDE R A 2 628 32 19,296 10/05/2020 75 69 4565 CALLE ALCAZAR 030 AVENIDA VERDE AVENIDA DE LOS LOBOS MARINOS E R A 2 305 32 9,600 10/05/2020 71 64 4565 CALLE ALCAZAR 040 AVENIDA DE LOS LOBOS MARINOS E AVENIDA SAN JUAN E R A 2 298 32 9,536 10/05/2020 59 48 6450 CALLE ALICANTE 010 PUERTA DEL SOL CALLE BATIDO R A 2 379 24 9,096 04/07/2025 67 67 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 7 of 20 5/22/2025 386
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 6450 CALLE ALICANTE 020 CALLE BATIDO AVENIDA PICO R A 2 314 24 7,536 04/07/2025 78 78 4490 CALLE ALTA 010 END LA ESPERANZA S R A 2 84 35 2,932 10/05/2020 71 64 5505 CALLE ALTEA 010 CAMINO LA PEDRIZA VIA RESEDA R A 2 206 36 7,416 05/01/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 87 87 5505 CALLE ALTEA 020 VIA RESEDA VIA SEDONA R A 2 1,222 36 43,992 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 83 83 5505 CALLE ALTEA 030 VIA SEDONA CAMINO MIRA MONTE R A 2 517 36 18,612 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 86 86 5505 CALLE ALTEA 040 CAMINO MIRA MONTE CALLE VIENTO R A 2 474 36 17,064 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 81 81 5505 CALLE ALTEA 050 CALLE VIENTO END R A 2 407 36 14,652 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 89 89 2380 CALLE AMABLE 010 END CALLE VALLARTA R O 2 766 27 20,682 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 86 95 6040 CALLE AMANECER 010 AVENIDA PICO CALLE NEGOCIO R O 2 600 48 28,800 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 94 88 6040 CALLE AMANECER 020 CALLE NEGOCIO CALLE CORDILLERA R A 2 1,350 40 54,000 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 94 87 6040 CALLE AMANECER 030 CALLE CORDILLERA CALLE TREPADORA R O 2 1,050 40 42,000 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 92 88 6040 CALLE AMANECER 040 CALLE TREPADORA CALLE RECODO R A 2 475 40 19,000 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 76 85 6040 CALLE AMANECER 050 CALLE RECODO CALLE SOMBRA R A 2 950 40 38,000 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 77 89 6040 CALLE AMANECER 060 CALLE SOMBRA AVENIDA LA PATA R A 2 991 40 39,640 02/04/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 77 91 2560 CALLE AMIGO 010 END CALLE FRONTERA R O 2 469 35 16,415 03/26/2025 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/07/2025 69 69 2560 CALLE AMIGO 020 CALLE FRONTERA CALLE DESCANSO R O 2 312 35 10,920 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 2560 CALLE AMIGO 030 CALLE DESCANSO END R O 2 144 35 5,040 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 79 79 1160 CALLE ANDALUCIA 010 CALLE BIENVENIDO CITY LIMIT R A 2 939 39 36,621 04/07/2025 88 88 6480 CALLE AVANZADO 010 END CAMINO CELOSIA R A 2 887 40 35,480 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 87 87 6480 CALLE AVANZADO 020 CAMINO CELOSIA END R A 2 798 40 31,920 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 86 86 1260 CALLE BAHIA 010 AVENIDA SANTA MARGARITA PRIVATE RD R A 2 950 30 28,500 10/05/2020 89 81 4920 CALLE BALBOA 010 END CALLE CORTEZ R A 2 515 33 16,995 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 65 78 2580 CALLE BARANDA 010 END CALLE JUAREZ R O 2 663 35 23,205 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 79 79 6490 CALLE BATIDO 010 CALLE ALICANTE END R A 2 239 24 5,736 04/07/2025 77 77 5030 CALLE BELLA LOMA 010 END AVENIDA LA CUESTA R A 2 399 33 13,167 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 91 1150 CALLE BIENVENIDO 010 CITY LIMIT CALLE ABRIL R A 2 242 40 9,680 03/07/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 78 78 1150 CALLE BIENVENIDO 020 CALLE ABRIL CALLE MAYO R A 2 178 40 7,120 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 82 82 1150 CALLE BIENVENIDO 030 CALLE MAYO CALLE JUNO R A 2 441 40 17,640 02/21/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 74 74 1150 CALLE BIENVENIDO 040 CALLE JUNO VIA MANZANA R A 2 1,196 40 47,840 02/11/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 71 71 1150 CALLE BIENVENIDO 050 VIA MANZANA CALLE ANDALUCIA R A 2 808 40 32,320 02/10/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 76 76 410 CALLE BONITO 010 CALLE VALLE CALLE DE LOS MOLINOS R A 2 469 27 12,663 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 87 3520 CALLE BORREGO 010 END CAMINO MIRA COSTA R A 2 430 39 16,770 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 2390 CALLE BRISA 010 END CALLE VALLARTA R O 2 791 27 21,357 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 85 95 2630 CALLE BURRO 010 END CALLE CUADRA R O 2 394 35 13,790 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 82 82 1510 CALLE CAMPANA 010 END CALLE CANASTA R O 2 583 39 22,737 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 69 69 1510 CALLE CAMPANA 020 CALLE CANASTA CAMINO DE LOS MARES R O 2 202 51 10,302 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 64 64 6510 CALLE CAMPANERO 010 PASEO LUNA VIA SUERTE R A 2 529 41 21,689 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 86 86 6510 CALLE CAMPANERO 020 VIA SUERTE AVENIDA TALEGA R A 2 339 41 13,899 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 79 79 6510 CALLE CAMPANERO 030 AVENIDA TALEGA ROUNDABOUT R A 2 418 40 16,720 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 87 87 3710 CALLE CAMPO 010 AVENIDA SIERRA END R A 2 355 29 10,295 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 84 87 1515 CALLE CANASTA 010 END CALLE CAMPANA R O 2 724 39 28,236 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 04/07/2025 65 65 1725 CALLE CAPRI 010 END AVENIDA DE LA RIVIERA R A 2 150 28 4,200 02/21/2023 78 75 2510 CALLE CHUECA 010 END CALLE GAUCHO R O 2 183 35 6,405 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 77 77 2510 CALLE CHUECA 020 CALLE GAUCHO VIA CHUECA R O 2 335 35 11,725 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 85 85 2510 CALLE CHUECA 030 VIA CHUECA END R O 2 281 35 9,835 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 83 83 1775 CALLE CITA 010 END CALLE DEL PACIFICO R A 2 189 29 5,481 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 89 150 CALLE COLINA 010 BUENA VISTA CALLE SACRAMENTO R A 2 270 29 7,830 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 91 92 3295 CALLE CONCHITA 010 END ESPLANADE R A 2 156 35 5,444 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 92 93 2410 CALLE CONTENTA 010 END CALLE VALLARTA R O 2 637 35 22,295 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 85 95 6010 CALLE CORDILLERA 010 CALLE AMANECER END R O 2 1,224 44 53,856 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 96 88 2490 CALLE CORRAL 010 END CALLE GUADALAJARA R O 2 161 35 5,619 03/24/2025 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/07/2025 81 81 4910 CALLE CORTEZ 010 AVENIDA SAN CARLOS CALLE BALBOA R A 2 359 33 11,847 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 69 81 4910 CALLE CORTEZ 020 CALLE BALBOA AVENIDA PRESIDIO R A 2 468 33 15,444 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 75 86 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 8 of 20 5/22/2025 387
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 2650 CALLE CUADRA 010 CALLE FRONTERA CALLE BURRO R A 2 292 39 11,388 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2650 CALLE CUADRA 020 CALLE BURRO CALLE PAISANO R A 2 680 39 26,520 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 2650 CALLE CUADRA 030 CALLE PAISANO CALLE GAUCHO R A 2 248 39 9,672 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 2450 CALLE CUMBRE 010 END CALLE VALLARTA R A 2 243 35 8,481 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 77 77 4900 CALLE DE ANZA 010 AVENIDA SAN CARLOS AVENIDA PRESIDIO R A 2 768 33 25,344 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 88 88 470 CALLE DE INDUSTRIAS 010 CALLE DE LOS MOLINOS AVENIDA PICO R O 2 631 32 20,192 01/15/2021 GRIND AND OVERLAY 04/07/2025 99 96 3090 CALLE DE LOS ALAMOS 010 AVENIDA VALENCIA W CALLE MARINA R A 2 140 40 5,600 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 85 88 3090 CALLE DE LOS ALAMOS 020 CALLE MARINA CALLE SERENA R A 2 265 40 10,600 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 81 85 3090 CALLE DE LOS ALAMOS 030 CALLE SERENA CALLE PRIMAVERA R A 2 282 40 11,280 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 82 85 3090 CALLE DE LOS ALAMOS 040 CALLE PRIMAVERA CALLE ROCA VISTA R A 2 393 40 15,720 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 79 83 3090 CALLE DE LOS ALAMOS 050 CALLE ROCA VISTA CALLE LASUEN R A 2 307 40 12,280 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 83 3090 CALLE DE LOS ALAMOS 060 CALLE LASUEN AVENIDA DE LOS LOBOS MARINOS W R A 2 743 40 29,720 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 82 500 CALLE DE LOS MOLINOS 010 EL CAMINO REAL N LOS OBREROS LN R A 2 109 32 24,288 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 95 90 500 CALLE DE LOS MOLINOS 020 LOS OBREROS LN CALLE VALLE R A 2 604 42 24,528 03/27/2025 18CSC - MILL AND FILL (0.50') - Water Patch Repair 02/21/2023 94 90 500 CALLE DE LOS MOLINOS 030 CALLE VALLE CALLE VALLE R A 2 393 42 17,220 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 94 88 500 CALLE DE LOS MOLINOS 040 CALLE VALLE CALLE BONITO R A 2 255 42 10,710 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 86 500 CALLE DE LOS MOLINOS 050 CALLE BONITO RINCON CT R A 2 365 42 15,330 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 95 91 500 CALLE DE LOS MOLINOS 060 RINCON CT AVENIDA PICO R A 2 643 42 27,006 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 92 88 500 CALLE DE LOS MOLINOS 070 AVENIDA PICO CALLE DE INDUSTRIAS R A 2 712 39 27,768 01/15/2021 RECONSTRUCT SURFACE (AC) 04/07/2025 98 96 500 CALLE DE LOS MOLINOS 080 CALLE DE INDUSTRIAS AVENIDA NAVARRO R A 2 272 39 10,608 01/15/2021 RECONSTRUCT SURFACE (AC) 04/07/2025 98 96 4880 CALLE DE SOTO 010 AVENIDA PRESIDIO CALLE NINA R A 2 262 33 8,646 10/05/2020 80 75 4880 CALLE DE SOTO 020 CALLE NINA AVENIDA SALVADOR R A 2 1,300 33 42,900 10/05/2020 80 75 1318 CALLE DEL CERRITO 010 CALLE GOMEZ CALLE DEL RITO R A 2 110 21 2,310 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 89 89 1318 CALLE DEL CERRITO 020 CALLE DEL RITO ARDILLA LN R A 2 490 21 10,290 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 89 89 5970 CALLE DEL CERRO 010 AVENIDA PICO AVENIDA VISTA MONTANA R A 2 2,300 50 115,000 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 74 76 5970 CALLE DEL CERRO 020 AVENIDA VISTA MONTANA LORCA R A 2 775 44 34,100 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 69 72 5970 CALLE DEL CERRO 030 LORCA CAMINO IBIZA R A 2 1,010 36 36,360 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 76 77 5970 CALLE DEL CERRO 040 CAMINO IBIZA AVENIDA VISTA MONTANA R A 2 2,025 36 72,900 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 70 72 5970 CALLE DEL CERRO 050 AVENIDA VISTA MONTANA AVENIDA LA PATA R A 2 1,994 36 71,784 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 79 80 1520 CALLE DEL COMERCIO 010 EL CAMINO REAL S AVENIDA SAN LUIS REY R A 2 1,560 30 46,800 06/21/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 84 89 5310 CALLE DEL JUEGO 010 END CALLE ESCUELA R A 2 334 35 11,657 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 74 1785 CALLE DEL PACIFICO 010 END CALLE CITA R A 2 457 35 15,995 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 82 85 1785 CALLE DEL PACIFICO 020 CALLE CITA OLA VISTA S R A 2 366 35 12,810 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 82 85 1300 CALLE DEL RITO 010 CALLE DEL CERRITO ARDILLA LN R A 2 611 24 14,664 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 88 88 5160 CALLE DELICADA 010 END CALLE MIGUEL R A 2 310 31 9,610 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 87 5160 CALLE DELICADA 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 1,109 31 34,379 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 73 80 5160 CALLE DELICADA 030 AVENIDA PRESIDIO END R A 2 945 31 29,295 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 84 2550 CALLE DESCANSO 010 END CALLE AMIGO R O 2 461 35 16,135 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 350 CALLE DESHECHA 010 AVENIDA ESTACION AVENIDA PICO R A 2 494 26 12,844 11/02/2024 18CSC - MILL AND FILL (0.50') - Water Patch Repair 02/21/2023 85 84 350 CALLE DESHECHA 020 BOCA DE LA PLAYA AVENIDA PICO R A 2 323 26 8,398 05/01/2020 SLURRY SEAL 02/21/2023 86 82 2220 CALLE DONCELLA 010 CALLE GUADALAJARA CALLE ESTEBAN R A 2 218 40 8,720 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 94 2220 CALLE DONCELLA 020 CALLE ESTEBAN CALLE HERALDO R O 2 1,064 40 42,560 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 77 91 4990 CALLE DORADO 010 END CALLE MIGUEL R A 2 559 31 17,329 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 83 83 4990 CALLE DORADO 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 1,700 31 52,700 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 72 75 2420 CALLE DULCE 010 END CALLE VALLARTA R O 2 509 35 17,815 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 81 93 4610 CALLE DULCINEA 010 CALLE MONSERRAT END R A 2 650 33 21,450 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 99 92 2440 CALLE EMBOCADURA 010 CALLE VALLARTA CALLE FRONTERA R O 2 1,064 39 41,496 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 94 5260 CALLE EMPALME 010 AVENIDA LA CUESTA CALLE MIGUEL R A 2 978 31 30,318 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 99 90 5260 CALLE EMPALME 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 857 31 26,567 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 74 76 5260 CALLE EMPALME 030 AVENIDA PRESIDIO CALLE FIESTA R A 2 570 31 17,670 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 85 5260 CALLE EMPALME 040 CALLE FIESTA CALLE NEBLINA R A 2 271 31 8,401 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 85 5260 CALLE EMPALME 050 CALLE NEBLINA CALLE PUEBLO R A 2 229 31 7,099 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 85 5260 CALLE EMPALME 060 CALLE PUEBLO CALLE ROBLES R A 2 177 31 5,487 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 88 86 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 9 of 20 5/22/2025 388
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 5260 CALLE EMPALME 070 CALLE ROBLES CALLE FAMILIA R A 2 199 31 6,169 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 86 5320 CALLE ESCUELA 010 CALLE MIGUEL CALLE SALIDA R A 2 189 31 5,859 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 74 76 5320 CALLE ESCUELA 020 CALLE SALIDA CALLE DEL JUEGO R A 2 321 31 9,951 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 69 77 5320 CALLE ESCUELA 030 CALLE DEL JUEGO CALLE SANDIA R A 2 489 31 15,159 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 84 5320 CALLE ESCUELA 040 CALLE SANDIA AVENIDA PRESIDIO R A 2 681 31 21,111 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 76 82 4480 CALLE ESMARCA 010 LA ESPERANZA S END R A 2 177 35 6,177 10/05/2020 97 85 2230 CALLE ESTEBAN 010 CALLE GUADALAJARA CALLE DONCELLA R O 2 1,423 35 49,805 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 77 91 5180 CALLE FAMILIA 010 END CALLE MIGUEL R A 2 327 31 10,137 10/05/2020 71 63 5180 CALLE FAMILIA 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 905 31 28,055 10/05/2020 73 67 5180 CALLE FAMILIA 030 AVENIDA PRESIDIO CALLE EMPALME R A 2 895 31 27,745 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 78 83 5180 CALLE FAMILIA 040 CALLE EMPALME END R A 2 215 31 6,665 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 67 71 5150 CALLE FELICIDAD 010 END CALLE MIGUEL R A 2 256 31 7,936 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 77 78 5150 CALLE FELICIDAD 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 1,280 31 39,680 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 74 81 2430 CALLE FIERROS 010 END CALLE FRONTERA R A 2 625 35 21,875 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 74 74 5250 CALLE FIESTA 010 END CALLE MIGUEL R A 2 540 31 16,740 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 85 5250 CALLE FIESTA 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 840 31 26,040 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 85 84 5250 CALLE FIESTA 030 AVENIDA PRESIDIO CALLE EMPALME R A 2 600 31 18,600 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 84 84 620 CALLE FRONTERA 010 CALLE VALLARTA CALLE EMBOCADURA R A 2 625 40 25,000 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 78 78 620 CALLE FRONTERA 020 CALLE EMBOCADURA CALLE FIERROS R A 2 229 40 9,160 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 80 80 620 CALLE FRONTERA 030 CALLE FIERROS CALLE GANADERO R A 2 232 40 9,280 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 80 80 620 CALLE FRONTERA 040 CALLE GANADERO CALLE GUADALAJARA R A 2 473 40 18,920 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 84 84 620 CALLE FRONTERA 050 CALLE GUADALAJARA CALLE AMIGO R A 2 645 39 25,155 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 620 CALLE FRONTERA 060 CALLE AMIGO CALLE GAUCHO R A 2 315 39 12,285 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 84 84 620 CALLE FRONTERA 070 CALLE GAUCHO CALLE JUAREZ R A 2 401 39 15,639 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 620 CALLE FRONTERA 080 CALLE JUAREZ CALLE SORPRESO R A 2 229 39 8,931 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 82 82 620 CALLE FRONTERA 090 CALLE SORPRESO CALLE LUEGO R A 2 275 39 10,725 10/03/2023 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 620 CALLE FRONTERA 100 CALLE LUEGO CALLE CUADRA R A 2 1,003 39 39,117 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 84 84 620 CALLE FRONTERA 110 CALLE CUADRA CAMINO FARO R A 2 1,463 39 57,057 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 83 83 620 CALLE FRONTERA 120 CAMINO FARO AVENIDA VISTA HERMOSA R A 2 577 39 22,503 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/07/2025 85 85 620 CALLE FRONTERA 130 AVENIDA VISTA HERMOSA AVENIDA PICO R O 2 4,842 46 222,732 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 91 91 2400 CALLE GANADERO 010 END CALLE FRONTERA R A 2 693 35 24,255 03/24/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 76 76 2570 CALLE GAUCHO 010 END CALLE FRONTERA R O 2 575 35 20,125 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 2570 CALLE GAUCHO 020 CALLE FRONTERA CALLE LUEGO R A 2 445 35 15,575 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 2570 CALLE GAUCHO 030 CALLE LUEGO CALLE CUADRA R O 2 593 35 20,755 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 2570 CALLE GAUCHO 040 CALLE CUADRA CALLE CHUECA R O 2 479 35 16,765 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2570 CALLE GAUCHO 050 CALLE CHUECA CALLE GUADALAJARA R O 2 531 35 18,585 04/07/2025 79 79 1325 CALLE GOMEZ 010 AVENIDA CRESPI CALLE DEL CERRITO R A 2 135 21 2,835 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 85 88 1325 CALLE GOMEZ 020 CALLE DEL CERRITO AVENIDA ORTEGA R A 2 662 21 13,902 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 90 89 1325 CALLE GOMEZ 030 AVENIDA ORTEGA ARDILLA LN R A 2 258 21 5,418 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 90 89 3350 CALLE GRANDE VISTA 010 END CALLE QUIETO R A 2 364 35 12,740 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 3350 CALLE GRANDE VISTA 020 CALLE QUIETO CALLE QUIETO R A 2 1,040 35 36,400 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 75 75 3350 CALLE GRANDE VISTA 030 CALLE QUIETO AVENIDA VAQUERO R A 2 2,900 35 101,500 02/10/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 74 74 2520 CALLE GUADALAJARA 010 AVENIDA VAQUERO CALLE JUAREZ R A 2 460 40 18,400 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 2520 CALLE GUADALAJARA 020 CALLE JUAREZ CALLE HIDALGO R A 2 830 38 31,540 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 83 83 2520 CALLE GUADALAJARA 030 CALLE HIDALGO CALLE FRONTERA R A 2 422 38 16,036 03/17/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 85 85 2520 CALLE GUADALAJARA 040 CALLE FRONTERA CALLE GAUCHO R A 2 826 39 32,214 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 2520 CALLE GUADALAJARA 050 CALLE GAUCHO CALLE CORRAL R A 2 242 39 9,438 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 2520 CALLE GUADALAJARA 060 CALLE CORRAL CALLE REATA R A 2 475 39 18,525 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 2520 CALLE GUADALAJARA 070 CALLE REATA CALLE VALLARTA R A 2 710 39 27,690 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2520 CALLE GUADALAJARA 080 CALLE VALLARTA CALLE DONCELLA R A 2 1,155 39 45,045 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 81 93 2520 CALLE GUADALAJARA 090 CALLE DONCELLA CALLE PIEDRAS R A 2 587 39 22,893 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 77 91 2520 CALLE GUADALAJARA 100 CALLE PIEDRAS CALLE ESTEBAN R A 2 595 40 23,800 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 79 92 2520 CALLE GUADALAJARA 110 CALLE ESTEBAN CALLE NUEVO R A 2 720 40 28,800 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 85 94 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 10 of 20 5/22/2025 389
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3547 CALLE GUAYMAS 010 CALLE LA VETA CAMINO MIRA COSTA R A 2 622 39 24,258 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 83 83 2210 CALLE HERALDO 010 CAMINO VERA CRUZ ARROYO R A 2 465 40 18,600 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 2210 CALLE HERALDO 020 ARROYO PANADERO R A 2 445 40 17,800 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 2210 CALLE HERALDO 030 PANADERO CAMINANTE R A 2 220 40 8,800 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 2210 CALLE HERALDO 040 CAMINANTE OTERO R A 2 77 40 3,080 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2210 CALLE HERALDO 050 OTERO CAMPO RASO R A 2 658 40 26,320 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 2210 CALLE HERALDO 060 CAMPO RASO NOVILUNIO R A 2 200 40 8,000 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2210 CALLE HERALDO 070 NOVILUNIO PENASCO R A 2 450 40 18,000 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 2210 CALLE HERALDO 080 PENASCO CALLE DONCELLA R A 2 1,105 40 44,200 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 2210 CALLE HERALDO 090 CALLE DONCELLA VIA BLANCO R A 2 204 40 8,160 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 79 79 2540 CALLE HIDALGO 010 END CALLE GUADALAJARA R O 2 322 35 11,270 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 2540 CALLE HIDALGO 020 CALLE GUADALAJARA END R O 2 622 35 21,770 03/17/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 80 80 6620 CALLE IGLESIA 010 CALLE DEL CERRO CALLE PINTORESCO R A 2 249 55 13,695 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 66 78 6620 CALLE IGLESIA 020 CALLE PINTORESCO CALLE PINTORESCO R A 2 1,187 41 48,667 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 64 83 6620 CALLE IGLESIA 030 CALLE PINTORESCO CALLE IGLESIA R A 2 260 41 10,660 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 69 80 6620 CALLE IGLESIA 040 AVENIDA FABRICANTE AVENIDA LA PATA R A 2 400 41 16,400 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 59 75 2590 CALLE JUAREZ 010 END CALLE GUADALAJARA R O 2 504 39 19,656 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 2590 CALLE JUAREZ 020 CALLE GUADALAJARA VIA JUAREZ R O 2 494 37 18,278 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2590 CALLE JUAREZ 030 VIA JUAREZ CALLE BARANDA R O 2 746 37 27,602 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 2590 CALLE JUAREZ 040 CALLE BARANDA CALLE FRONTERA R O 2 308 37 11,396 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 85 85 1060 CALLE JUNO 010 CALLE BIENVENIDO VIA SACRAMENTO R A 2 377 31 11,687 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 1060 CALLE JUNO 020 VIA SACRAMENTO CALLE MONTEREY R A 2 783 31 24,273 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1060 CALLE JUNO 030 CALLE MONTEREY CALLE MAYO R A 2 1,322 31 40,982 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 3850 CALLE LA SERNA 010 AVENIDA SAN PABLO END R A 2 695 33 22,935 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 85 87 3540 CALLE LA VETA 010 END CALLE GUAYMAS R A 2 264 39 10,296 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 91 91 3540 CALLE LA VETA 020 CALLE GUAYMAS CAMINO MIRA COSTA R A 2 1,149 39 44,811 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 440 CALLE LAGO 010 END EL CAMINO REAL N R O 2 411 29 11,919 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 87 91 375 CALLE LAS BOLAS 010 BOCA DE LA PLAYA VIA SACRAMENTO R A 2 355 39 13,845 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 94 95 375 CALLE LAS BOLAS 020 CALLE SACRAMENTO AVENIDA FLORENCIA R A 2 547 39 21,333 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 89 90 1716 CALLE LAS PALMAS 010 AVENIDA LA COSTA AVENIDA DE LA RIVIERA R A 2 428 35 14,980 02/21/2023 73 69 1625 CALLE LASUEN 010 CALLE DE LOS ALAMOS AVENIDA DE LOS LOBOS MARINOS W R A 2 360 24 8,640 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 83 86 4350 CALLE LETICIA 010 END AVIENDA SAN JUAN E R A 2 272 35 9,493 10/05/2020 91 83 2610 CALLE LUEGO 010 CALLE FRONTERA CALLE MACHO R A 2 245 39 9,555 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 2610 CALLE LUEGO 020 CALLE MACHO CALLE GAUCHO R O 2 262 39 10,218 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 2620 CALLE MACHO 010 END CALLE LUEGO R O 2 478 35 16,730 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 79 79 1750 CALLE MADIERA 010 END AVENIDA DE LA RIVIERA R A 2 165 29 4,785 02/21/2023 85 83 1730 CALLE MAJORCA 010 END AVENIDA DE LA RIVIERA R A 2 223 35 7,805 02/21/2023 75 72 4640 CALLE MALAGUENA 010 AVENIDA SALVADOR END R A 2 448 35 15,635 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 96 90 6430 CALLE MARIA 010 END AVENIDA SAN JUAN E R A 2 75 35 2,625 10/05/2020 91 83 30800 CALLE MARINA 030 CALLE DE LOS ALAMOS AVENIDA DE LOS LOBOS MARINOS W R A 2 886 27 21,060 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 85 87 4360 CALLE MAYITA 010 END AVENIDA SAN JUAN E R A 2 90 35 3,150 10/05/2020 89 81 1050 CALLE MAYO 010 CALLE BIENVENIDO VIA SACRAMENTO R A 2 535 31 16,585 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1050 CALLE MAYO 020 VIA SACRAMENTO CALLE MONTEREY R A 2 785 31 24,335 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1050 CALLE MAYO 030 CALLE MONTEREY CALLE JUNO R A 2 1,205 31 37,355 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 93 93 1050 CALLE MAYO 040 CALLE JUNO CALLE REAL R A 2 607 31 18,817 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 4830 CALLE MENDOZA 010 END AVENIDA PRESIDIO R A 2 416 35 14,518 10/05/2020 78 71 5280 CALLE MIGUEL 010 AVENIDA PRESIDIO CALLE MIGUEL R A 2 149 40 5,960 05/01/2020 SLURRY SEAL 10/05/2020 97 85 5280 CALLE MIGUEL 020 CALLE MIGUEL CALLE ESCUELA R A 2 548 40 21,920 05/01/2020 SLURRY SEAL 10/05/2020 99 85 5280 CALLE MIGUEL 030 CALLE ESCUELA CALLE EMPALME R A 2 425 40 17,000 10/05/2020 99 85 5280 CALLE MIGUEL 040 CALLE EMPALME CALLE FIESTA R A 2 198 40 7,920 10/05/2020 98 85 5280 CALLE MIGUEL 050 CALLE FIESTA CALLE NEBLINA R A 2 202 40 8,080 10/05/2020 98 85 5280 CALLE MIGUEL 060 CALLE NEBLINA CALLE PUEBLO R A 2 213 40 8,520 10/05/2020 99 85 5280 CALLE MIGUEL 070 CALLE PUEBLO CALLE FAMILIA R A 2 195 40 7,800 10/05/2020 98 85 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 11 of 20 5/22/2025 390
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 5280 CALLE MIGUEL 080 CALLE FAMILIA CALLE VILLARIO R A 2 205 40 8,200 10/05/2020 99 85 5280 CALLE MIGUEL 090 CALLE VILLARIO CALLE DELICADA R A 2 200 40 8,000 10/05/2020 98 85 5280 CALLE MIGUEL 100 CALLE DELICADA CALLE FELICIDAD R A 2 170 40 6,800 09/12/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 98 90 5280 CALLE MIGUEL 110 CALLE FELICIDAD CALLE PESCADOR R A 2 165 40 6,600 10/05/2020 98 85 5280 CALLE MIGUEL 120 CALLE PESCADOR AVENIDA LA CUESTA R A 2 147 40 5,880 10/05/2020 99 85 5280 CALLE MIGUEL 130 AVENIDA LA CUESTA CALLE DORADO R A 2 188 40 7,520 10/05/2020 100 85 5280 CALLE MIGUEL 140 CALLE DORADO CALLE RICA R A 2 178 39 6,942 10/05/2020 97 85 5280 CALLE MIGUEL 150 CALLE RICA AVENIDA PRESIDIO R A 2 364 39 14,196 10/05/2020 98 85 5270 CALLE MIGUEL CDS 010 CALLE MIGUEL END R A 2 62 65 4,030 10/05/2020 97 85 352 CALLE MIRADOR 010 AVENIDA FLORENCIA AVENIDA DEL REPOSO R A 2 239 29 6,931 02/21/2023 80 78 352 CALLE MIRADOR 020 AVENIDA DEL REPOSO AVENIDA DE LA GRULLA R A 2 491 29 14,239 02/21/2023 81 77 1710 CALLE MONACO 010 AVENIDA LA COSTA AVENIDA DE LA RIVIERA R A 2 316 34 10,744 02/21/2023 87 85 4620 CALLE MONSERRAT 010 AVENIDA SALVADOR CALLE DULCINEA R A 2 312 33 10,296 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 100 92 4620 CALLE MONSERRAT 020 CALLE DULCINEA END R A 2 455 33 15,015 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 92 960 CALLE MONTE CARLO 010 END AVENIDA DE LA RIVIERA R A 2 495 30 14,850 02/21/2023 77 74 1740 CALLE MONTE CRISTO 010 AVENIDA LA COSTA AVENIDA DE LA RIVIERA R A 2 421 35 14,735 02/21/2023 79 75 1020 CALLE MONTEREY 010 CITY LIMIT CALLE ABRIL R A 2 163 40 6,520 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 62 62 1020 CALLE MONTEREY 020 CALLE ABRIL CALLE MAYO R A 2 172 40 6,880 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1020 CALLE MONTEREY 030 CALLE MAYO CALLE JUNO R A 2 168 39 6,552 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 93 93 5240 CALLE NEBLINA 010 END CALLE MIGUEL R A 2 521 31 16,151 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 84 84 5240 CALLE NEBLINA 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 842 31 26,102 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 75 78 5240 CALLE NEBLINA 030 AVENIDA PRESIDIO CALLE EMPALME R A 2 806 31 24,986 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 78 81 6030 CALLE NEGOCIO 010 CALLE NEGOCIO CALLE AMANECER R A 2 541 44 23,804 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 96 90 6030 CALLE NEGOCIO 020 CALLE AMANECER CALLE TREPADORA R A 2 2,443 44 107,492 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 96 92 6030 CALLE NEGOCIO 030 CALLE TREPADORA END R A 2 331 44 14,564 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 96 90 4870 CALLE NINA 010 CALLE DE SOTO END R A 2 540 29 15,660 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 78 79 2170 CALLE NUEVO 010 CAMINO DE LOS MARES VIA MORADA R A 2 1,092 40 43,680 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 85 94 2170 CALLE NUEVO 020 VIA MORADA VIA AMAPOLA R A 2 308 40 12,320 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 80 92 2170 CALLE NUEVO 030 VIA AMAPOLA CALLE GUADALAJARA R A 2 219 40 8,760 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 94 2170 CALLE NUEVO 040 CALLE GUADALAJARA END R A 2 196 40 7,840 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 79 92 2640 CALLE PAISANO 010 END CALLE CUADRA R O 2 239 35 8,341 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 4650 CALLE PASTADERO 010 END CALLE AGUILA R A 2 435 40 17,400 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 75 86 4650 CALLE PASTADERO 020 CALLE AGUILA AVENIDA VISTA MONTANA R A 2 2,509 40 100,360 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 70 80 4510 CALLE PATRICIA 010 LA ESPERANZA S VIA ROBINA R A 2 587 33 19,371 11/20/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 70 69 4510 CALLE PATRICIA 020 VIA ROBINA END R A 2 287 33 9,471 11/20/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 69 68 5140 CALLE PESCADOR 010 CALLE MIGUEL AVENIDA PRESIDIO R A 2 1,460 31 45,260 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 81 2250 CALLE PIEDRAS 010 VIA AMAPOLA VIA BELLOTA R A 2 173 27 4,671 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 74 89 2250 CALLE PIEDRAS 020 VIA BELLOTA CALLE GUADALAJARA R A 2 250 27 6,750 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 76 90 6370 CALLE PINTORESCO 010 CALLE IGLESIA CALLE IGLESIA R A 2 1,350 41 55,350 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 69 90 CALLEPORTOCALLE PORTOFINO 010 AVENIDA TALEGA END R A 2 580 40 23,200 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 84 84 3120 CALLE PRIMAVERA 010 CALLE DE LOS ALAMOS CALLE ROCA VISTA R A 2 445 24 10,680 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 84 86 5210 CALLE PUEBLO 010 END CALLE MIGUEL R A 2 422 31 13,082 10/05/2020 71 63 5210 CALLE PUEBLO 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 886 31 27,466 10/05/2020 84 77 5210 CALLE PUEBLO 030 AVENIDA PRESIDIO CALLE EMPALME R A 2 941 31 29,171 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 82 82 240 CALLE PUENTE 010 AVENIDA DE LA GRULLA AVENIDA PELAYO R A 2 245 40 9,800 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 92 90 240 CALLE PUENTE 020 AVENIDA PELAYO AVENIDA ARAGON R A 2 263 40 10,520 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 92 89 240 CALLE PUENTE 030 AVENIDA ARAGON AVENIDA DEL PONIENTE R A 2 566 40 22,640 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 87 240 CALLE PUENTE 040 AVENIDA DEL PONIENTE CANADA W R A 2 162 40 6,480 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 87 240 CALLE PUENTE 050 CANADA W ESCALONES W R O 2 468 40 18,720 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 89 240 CALLE PUENTE 060 ESCALONES W MARIPOSA W R O 2 252 40 10,080 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 79 240 CALLE PUENTE 070 MARIPOSA W LA PALOMA R O 2 260 40 10,400 03/07/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 75 83 240 CALLE PUENTE 080 LA PALOMA MARQUITA W R O 2 280 40 11,200 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 89 90 240 CALLE PUENTE 090 MARQUITA W AVENIDA PALIZADA W R O 2 305 40 12,200 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 88 90 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 12 of 20 5/22/2025 391
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3390 CALLE QUIETO 010 CALLE GRANDE VISTA CAMINO ALONDRA R A 2 532 35 18,620 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 3390 CALLE QUIETO 020 CAMINO ALONDRA CALLE GRANDE VISTA R A 2 543 35 19,005 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 1140 CALLE REAL 010 CALLE ANDALUCIA VIA DEL CAMPO R A 2 395 40 15,800 02/10/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 80 80 1140 CALLE REAL 020 CALLE JUANITA CALLE ABRIL R A 2 300 40 12,000 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/07/2025 79 79 1140 CALLE REAL 030 CALLE ABRIL CALLE MAYO R A 2 166 40 6,640 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/07/2025 85 85 1140 CALLE REAL 040 CALLE MAYO VIA MANZANA R A 2 296 39 11,544 12/01/2023 02CSC - MILL AND FILL (0.20') - 5% - 10% 04/07/2025 78 78 1140 CALLE REAL 050 VIA MANZANA VIA DEL CAMPO R A 2 684 40 27,360 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 77 77 2480 CALLE REATA 010 END CALLE GUADALAJARA R O 2 600 35 21,000 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 6000 CALLE RECODO 010 CALLE AMANECER END R A 2 715 44 31,460 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 90 90 3782 CALLE REDONDEL 010 AVENIDA DE LA ESTRELLA AVENIDA DE LA ESTRELLA R A 2 1,352 29 39,208 12/05/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 86 89 4250 CALLE REGLA 010 END ENTRADA PARAISO R A 2 141 35 4,921 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 52 77 4950 CALLE RICA 010 END CALLE MIGUEL R A 2 185 35 6,457 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 85 85 4950 CALLE RICA 020 CALLE MIGUEL END R A 2 317 35 11,063 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 86 85 5190 CALLE ROBLES 010 AVENIDA PRESIDIO CALLE EMPALME R A 2 969 31 30,039 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 86 3100 CALLE ROCA VISTA 010 CALLE DE LOS ALAMOS CALLE PRIMAVERA R A 2 287 32 9,184 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 78 3100 CALLE ROCA VISTA 020 CALLE PRIMAVERA AVENIDA DE LOS LOBOS MARINOS W R A 2 457 32 14,624 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 80 390 CALLE SACRAMENTO 010 CALLE COLINA CALLE LAS BOLAS R A 2 265 39 10,335 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 92 390 CALLE SACRAMENTO 020 CALLE COLINA AVENIDA FLORENCIA R A 2 732 40 29,280 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 81 83 5290 CALLE SALIDA 010 END CALLE ESCUELA R A 2 456 35 15,914 10/05/2020 78 68 6330 CALLE SALUDA 010 AVENIDA LA PATA CORTE ALMANSA R A 2 997 40 39,880 05/03/2025 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/07/2025 89 97 6330 CALLE SALUDA 020 CORTE ALMANSA CALLE LA FRENTE R A 2 598 40 23,920 05/03/2025 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/07/2025 89 96 6330 CALLE SALUDA 030 CALLE LA FRENTE AVENIDA FRESAS R A 2 589 40 23,560 05/03/2025 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/07/2025 92 97 6330 CALLE SALUDA 040 AVENIDA FRESAS AVENIDA TALEGA R A 2 1,697 40 67,880 05/03/2025 08CSC - TYPE (II) SLURRY SEAL 3% PMCQS 04/07/2025 89 97 5300 CALLE SANDIA 010 END CALLE ESCUELA R A 2 455 35 15,880 07/31/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 84 83 6320 CALLE SARMENTOSO 010 CAMINO VERA CRUZ RIACHUELO R A 2 700 40 28,000 04/01/2019 SLURRY SEAL 04/07/2025 84 84 6320 CALLE SARMENTOSO 020 RIACHUELO VIA TULIPAN R O 2 3,138 32 100,416 06/01/2020 SLURRY SEAL 04/07/2025 79 79 6320 CALLE SARMENTOSO 030 VIA TULIPAN CAMINO DEL RIO R A 2 574 32 18,368 01/21/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 79 79 5040 CALLE SEGURO 010 END AVENIDA LA CUESTA R A 2 113 35 3,944 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 87 3050 CALLE SERENA 010 CALLE DE LOS ALAMOS AVENIDA DE LOS LOBOS MARINOS W R A 2 926 23 21,298 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 79 94 3550 CALLE SEVILLE N 010 AVENIDA PALIZADA W AVENIDA CABRILLO R A 2 256 40 10,240 02/21/2023 71 67 3550 CALLE SEVILLE N 020 AVENIDA CABRILLO AVENIDA DEL MAR R A 2 273 40 10,920 02/21/2023 71 67 3550 CALLE SEVILLE N 030 AVENIDA DEL MAR AVENIDA GRANADA R A 2 290 40 11,600 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 86 84 3550 CALLE SEVILLE N 040 AVENIDA GRANADA AVENIDA VICTORIA R A 2 346 40 18,720 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 90 88 5990 CALLE SOMBRA 010 END CALLE AMANECER R A 2 613 44 26,972 10/05/2020 92 84 5990 CALLE SOMBRA 020 CALLE AMANECER END R A 2 672 44 29,568 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 94 90 4930 CALLE SONORA 010 AVENIDA SAN CARLOS AVENIDA PRESIDIO R A 2 661 33 21,813 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 86 88 4930 CALLE SONORA 020 END AVENIDA SAN CARLOS R A 2 255 33 8,415 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 81 87 2600 CALLE SORPRESO 010 END CALLE FRONTERA R O 2 176 35 6,142 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 4630 CALLE TIBIDABO 010 AVENIDA SALVADOR END R A 2 195 35 6,806 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 90 880 CALLE TINAJA 010 END VIA CASCADITA R O 2 440 33 14,520 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 79 79 3170 CALLE TOLEDO 010 ESPLANADE PASEO DE CRISTOBAL W R A 2 235 64 15,040 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 82 3170 CALLE TOLEDO 020 PASEO DE CRISTOBAL W AVENIDA CORDOBA W R A 2 480 64 30,720 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 78 80 3170 CALLE TOLEDO 030 AVENIDA CORDOBA W AVENIDA GAVIOTA W R A 2 225 64 14,400 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 80 3170 CALLE TOLEDO 040 AVENIDA GAVIOTA W AVENIDA VALENCIA W R A 2 351 64 22,464 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 83 85 6280 CALLE TREPADORA 010 END CALLE AMANECER R A 2 541 44 23,804 10/05/2020 99 85 2460 CALLE VALLARTA 010 AVENIDA VAQUERO CALLE AMABLE R A 2 938 39 36,582 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 2460 CALLE VALLARTA 020 CALLE AMABLE CALLE BRISA R A 2 300 39 11,700 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2460 CALLE VALLARTA 030 CALLE BRISA CALLE CONTENTA R A 2 284 39 11,076 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 2460 CALLE VALLARTA 040 CALLE CONTENTA CALLE DULCE R A 2 305 39 11,895 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 75 75 2460 CALLE VALLARTA 050 CALLE DULCE CALLE EMBOCADURA R A 2 693 39 27,027 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 2460 CALLE VALLARTA 060 CALLE EMBOCADURA CALLE FRONTERA R A 2 596 39 23,244 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 83 83 2460 CALLE VALLARTA 070 CALLE FRONTERA CALLE GUADALAJARA R A 2 371 39 14,469 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 2460 CALLE VALLARTA 080 CALLE GUADALAJARA CALLE CUMBRE R A 2 308 39 12,012 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 79 79 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 13 of 20 5/22/2025 392
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 2460 CALLE VALLARTA 090 CALLE CUMBRE ACANTILADO R A 2 2,300 39 89,700 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 94 2460 CALLE VALLARTA 100 ACANTILADO VIA BLANCO R A 2 273 39 10,647 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 96 420 CALLE VALLE 010 CALLE DE LOS MOLINOS CALLE DE LOS MOLINOS R A 2 630 29 18,270 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 95 89 420 CALLE VALLE 020 CALLE DE LOS MOLINOS LOS OBREROS LN R A 2 165 29 4,785 02/21/2023 78 76 420 CALLE VALLE 030 CALLE BONITO EL CAMINO REAL N R A 2 700 29 20,300 02/21/2023 76 72 1525 CALLE VICENTE 010 END AVENIDA VAQUERO R A 2 1,261 32 40,352 03/24/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 70 70 5170 CALLE VILLARIO 010 END CALLE MIGUEL R A 2 300 31 9,300 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 84 84 5170 CALLE VILLARIO 020 CALLE MIGUEL AVENIDA PRESIDIO R A 2 980 31 30,380 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 85 87 3080 CALLE VISTA TORITO 010 AVENIDA VAQUERO VIA CORBINA R A 2 201 40 8,040 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 3080 CALLE VISTA TORITO 020 VIA CORBINA VIA SAN JACINTO R A 2 200 40 8,000 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 3080 CALLE VISTA TORITO 030 VIA SAN JACINTO VIA SAN GORGONIO R A 2 194 40 7,760 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 3080 CALLE VISTA TORITO 040 VIA SAN GORGONIO VIA MONTEZUMA R A 2 1,255 40 50,200 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 2110 CAMINANTE 010 END CALLE HERALDO R A 2 209 35 7,294 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 76 76 3470 CAMINO ALONDRA 010 CAMINO MIRA COSTA CALLE QUIETO R A 2 1,122 23 25,806 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 90 90 6530 CAMINO CELOSIA 010 CALLE AVANZADO AVENIDA PICO R A 2 430 61 26,230 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 90 90 2160 CAMINO DE LOS MARES (FRONTAGE) 010 AVENIDA VAQUERO CALLE NUEVO R O 2 3,170 31 98,270 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 77 77 6690 CAMINO FARO 010 CALLE FRONTERA CAMINO BUCANERO R A 2 690 32 22,080 05/01/2020 SLURRY SEAL 04/07/2025 77 77 6690 CAMINO FARO 020 CAMINO BUCANERO AVENIDA VISTA HERMOSA R A 2 930 32 29,760 05/01/2020 SLURRY SEAL 04/07/2025 79 79 5510 CAMINO LA PEDRIZA 010 AVENIDA VISTA HERMOSA CALLE ALTEA R A 2 480 62 29,760 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 89 89 5510 CAMINO LA PEDRIZA 020 CALLE ALTEA CALLE PACIFICA R A 2 2,275 36 81,900 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 88 88 5510 CAMINO LA PEDRIZA 030 CALLE PACIFICA CALLE VISTA DEL SOL R A 2 754 36 27,144 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 91 91 5510 CAMINO LA PEDRIZA 050 CALLE VISTA DEL SOL VIA AMOR R A 2 545 36 19,620 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 5510 CAMINO LA PEDRIZA 060 VIA AMOR CALLE CENTINELA R A 2 1,114 36 40,104 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 93 93 5510 CAMINO LA PEDRIZA 070 CALLE CENTINELA VIA PORTADA R A 2 250 36 9,000 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 94 94 6650 CAMINO LA PEDRIZA 080 VIA PORTADA CORTE MIRA VISTA R A 2 377 36 13,572 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 92 92 6650 CAMINO LA PEDRIZA 090 CORTE MIRA VISTA CORTE TIERRA CIELO R A 2 439 36 15,804 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 94 94 6650 CAMINO LA PEDRIZA 100 CORTE TIERRA CIELO CORTE TIERRA BELLA R A 2 396 36 14,256 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 89 89 6650 CAMINO LA PEDRIZA 110 CORTE TIERRA BELLA CALLE AMISTAD R A 2 561 36 20,196 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 91 91 6650 CAMINO LA PEDRIZA 120 CALLE AMISTAD CORTE CRISTIANITOS R A 2 542 36 19,512 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 83 83 6650 CAMINO LA PEDRIZA 130 CORTE CRISTIANITOS AVENIDA PICO R A 2 617 76 46,892 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 89 89 910 CAMINO SAN CLEMENTE 010 PACIFIC COAST HWY VIA SOCORRO R A 2 1,761 39 68,679 04/01/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 82 82 910 CAMINO SAN CLEMENTE 020 VIA SOCORRO END R A 2 282 39 10,998 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 82 82 2080 CAMPO RASO 010 CALLE HERALDO CHARCO R A 2 1,054 40 42,160 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 78 78 2080 CAMPO RASO 020 CHARCO COSTA R A 2 195 40 7,800 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 69 69 2080 CAMPO RASO 030 COSTA END R O 2 525 40 21,000 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 3640 CANADA E 010 EL CAMINO REAL N EL PORTAL E R A 2 735 40 29,400 01/22/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 71 72 220 CANADA W 010 BUENA VISTA ESCALONES W R A 2 785 40 31,400 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 84 220 CANADA W 020 ESCALONES W AVENIDA DEL PONIENTE R A 2 425 40 17,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 97 93 220 CANADA W 030 CALLE PUENTE EL CAMINO REAL N R A 2 1,302 40 52,080 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 86 3394 CAPISTRANO LN 010 AVENIDA DEL MAR SANTA ANA LN R A 2 414 25 10,350 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 83 80 5640 CARRETERA 010 CAMINO VERA CRUZ END R A 2 596 32 19,072 02/03/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 85 85 3325 CAZADOR LN 010 PASADENA CT ELENA LN R A 2 445 28 12,460 04/18/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 75 76 3325 CAZADOR LN 020 ELENA LN OLA VISTA S R O 2 885 28 24,780 04/01/2019 GRIND AND OVERLAY 02/21/2023 82 77 1980 CERCA 010 END RIACHUELO R A 2 382 40 15,280 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 86 86 1870 CERCADO 010 GANADO ESTANCIA R A 2 921 39 35,919 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 89 89 4270 CERRITO CIELO 010 ENTRADA PARAISO ARRIBA LINDA R O 2 688 33 22,704 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 88 88 4270 CERRITO CIELO 020 ARRIBA LINDA END R A 2 112 33 3,696 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 83 91 2070 CHARCO 010 END CAMPO RASO R A 2 244 35 8,516 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 3665 CHIQUITA 010 LA RONDA LA RONDA R A 2 347 29 10,063 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 81 83 3665 CHIQUITA 020 EL PORTAL E CHIQUITA R A 2 200 29 10,614 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 85 86 3444 CORONA LN 010 MONTEREY LN AVENIDA VICTORIA R A 2 321 25 8,025 05/01/2020 SLURRY SEAL 02/21/2023 76 72 2730 CORONADO LN 010 AVENIDA DEL MAR MONTEREY LN R A 2 552 25 13,800 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 94 89 6560 CORTE CRISTIANITOS 010 AVENIDA TRINIDAD CAMINO LA PEDRIZA R A 2 360 24 8,640 04/07/2025 84 84 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 14 of 20 5/22/2025 393
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3510 CORTO LN 010 END AVENIDA PALIZADA W R A 2 235 35 8,202 02/21/2023 79 75 2090 COSTA 010 CAMPO RASO CAMINO VERA CRUZ R A 2 162 35 5,654 04/07/2025 78 78 3290 DEL GADO RD 010 CAMINO CAPISTRANO CITY LIMIT R A 2 994 35 34,790 04/01/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 62 62 160 DIJE CT 010 END BUENA VISTA R A 2 229 35 7,992 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 93 93 1930 DOMADOR 010 ESTANCIA ARREOS R A 2 388 39 15,132 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 1930 DOMADOR 020 ARREOS END R A 2 234 39 9,126 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 5020 EL LEVANTE 010 LA ESPERANZA N AVENIDA PIZARRO R A 2 703 23 16,169 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 83 91 5020 EL LEVANTE 020 AVENIDA PIZARRO PATERO DEL ORO R A 2 222 32 7,104 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 87 5020 EL LEVANTE 030 PATERO DEL ORO AVENIDA SAN CARLOS R A 2 202 32 6,464 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 90 5020 EL LEVANTE 040 AVENIDA SAN CARLOS TERRAZA VISTA BAHIA R A 2 93 35 3,246 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 87 91 5020 EL LEVANTE 050 TERRAZA VISTA BAHIA END R A 2 559 32 17,888 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 75 88 3690 EL ORIENTE 010 AVENIDA DE LA ESTRELLA AVENIDA LOS FLORES R A 2 301 53 15,953 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 94 92 3690 EL ORIENTE 020 AVENIDA CABALLEROS AVENIDA DE LA PAZ R A 2 460 54 24,840 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 65 74 3770 EL PORTAL E 010 EL CAMINO REAL N LA RONDA R A 2 211 39 8,229 02/21/2023 71 66 3770 EL PORTAL E 020 LA RONDA LA RONDA R A 2 454 39 17,706 02/21/2023 75 71 3770 EL PORTAL E 030 LA RONDA CANADA E R A 2 300 39 11,700 02/21/2023 75 71 3770 EL PORTAL E 040 CANADA E AVENIDA DE LA ESTRELLA R A 2 280 39 10,920 02/21/2023 69 65 3750 EL PORTAL W 010 BUENA VISTA AVENIDA DEL PONIENTE R A 2 995 40 39,800 02/21/2023 71 67 3750 EL PORTAL W 015 EL PRADO EL PORTAL TRIANGLE W R A 2 477 40 19,080 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 88 3750 EL PORTAL W 020 EL CAMINO REAL N EL PORTAL TRIANGLE W R A 2 168 39 5,616 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 85 82 3750 EL PORTAL W 030 EL CAMINO REAL N EL PORTAL TRIANGLE W R O 2 170 40 6,800 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 89 190 EL PRADO 010 AVENIDA ARAGON EL PORTAL W R A 2 268 35 9,353 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 96 89 190 EL PRADO 020 EL PORTAL W AVENIDA DEL PONIENTE R A 2 277 35 9,667 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 89 85 3425 ELENA LN 010 AVENIDA VICTORIA CAZADOR LN R A 2 447 29 12,963 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 82 79 3530 ENCINO LN 010 AVENIDA PALIZADA W LINDA LN R A 2 345 29 10,005 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 86 82 3530 ENCINO LN 020 LINDA LN AVENIDA PALIZADA W R A 2 469 29 13,601 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 76 72 1670 ENSENADA 010 END ESTAMPIDA R A 2 209 40 8,360 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 87 87 4290 ENTRADA PARAISO 010 AVENIDA SAN JUAN E CERRITO CIELO R A 2 155 33 5,115 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 81 4290 ENTRADA PARAISO 020 CERRITO CIELO AVENIDA RAMONA E R A 2 340 33 11,220 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 81 81 4290 ENTRADA PARAISO 030 AVENIDA RAMONA E CALLE REGLA R A 2 400 33 13,200 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 78 79 4290 ENTRADA PARAISO 040 CALLE REGLA AVENIDA JUNIPERO E R A 2 165 33 5,445 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 67 70 4290 ENTRADA PARAISO 050 AVENIDA JUNIPERO E END R A 2 435 33 14,355 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 71 73 3630 ESCALONES E 010 EL CAMINO REAL N AVENIDA DE LA ESTRELLA R A 2 760 39 29,640 02/21/2023 71 66 3635 ESCALONES W 010 MARIPOSA W CANADA W R A 2 607 39 23,673 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 91 88 3635 ESCALONES W 020 CANADA W CALLE PUENTE R A 2 675 39 26,325 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 87 85 3635 ESCALONES W 030 CALLE PUENTE EL CAMINO REAL N R A 2 1,424 39 55,536 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 84 80 3280 ESPLANADE 010 PASEO DE CRISTOBAL W VISTA MARINA R A 2 280 64 17,920 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 82 3280 ESPLANADE 020 VISTA MARINA CALLE CONCHITA R A 2 185 64 11,840 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 78 80 3280 ESPLANADE 030 CALLE CONCHITA TRAFALGAR LN R A 2 275 64 17,600 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 79 81 3280 ESPLANADE 040 TRAFALGAR LN AVENIDA BARCELONA R A 2 176 64 11,264 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 77 80 3280 ESPLANADE 050 AVENIDA BARCELONA POCO PASEO R A 2 231 64 14,784 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 87 88 3280 ESPLANADE 060 POCO PASEO CALLE TOLEDO R A 2 168 64 10,752 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 84 86 3280 ESPLANADE 070 CALLE TOLEDO OLA VISTA S R A 2 775 40 31,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 77 81 3280 ESPLANADE 080 OLA VISTA S EL CAMINO REAL S R A 2 1,389 40 55,560 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 85 1770 ESTAMPIDA 010 INCLINADO ENSENADA R A 2 395 40 15,800 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 1770 ESTAMPIDA 020 ENSENADA CADENA R A 2 275 40 11,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 83 1770 ESTAMPIDA 025 CADENA PORTICO DEL NORTE R A 2 615 40 24,600 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 80 80 1770 ESTAMPIDA 027 PORTICO DEL SUR NOVILLA R A 2 450 40 18,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 89 89 1770 ESTAMPIDA 030 NOVILLA OBRAJERO R A 2 244 40 9,760 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1940 ESTANCIA 010 CABALLISTA DEL SUR OBRAJERO R A 2 303 40 12,120 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 93 93 1940 ESTANCIA 020 OBRAJERO CERCADO R A 2 500 40 20,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 1940 ESTANCIA 030 CERCADO HIERRO R A 2 147 40 5,880 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1940 ESTANCIA 040 HIERRO GANADO R A 2 401 40 16,040 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 15 of 20 5/22/2025 394
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 1940 ESTANCIA 050 GANADO DOMADOR R A 2 574 40 22,960 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 89 89 1940 ESTANCIA 060 DOMADOR CAMINO DE LOS MARES R A 2 177 40 7,080 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1850 ESTRIBO 010 END BONANZA R A 2 199 39 7,761 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 92 92 1860 GANADO 010 END CERCADO R A 2 324 39 12,636 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1860 GANADO 020 CERCADO ESTANCIA R A 2 601 39 23,439 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 1880 HIERRO 010 END ESTANCIA R A 2 326 40 13,040 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 1640 INCLINADO 010 END ALTURA R A 2 450 40 18,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 1640 INCLINADO 020 ALTURA ESTAMPIDA R A 2 200 40 8,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 1640 INCLINADO 030 ESTAMPIDA AFLORAMIENTO R A 2 675 40 27,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 86 86 1640 INCLINADO 040 AFLORAMIENTO SOMBREADO R A 2 688 40 27,520 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 84 84 1790 JINETE 010 END CABALLISTA DEL NORTE R A 2 350 40 14,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 4370 LA CIMA 010 END AVIENDA SAN JUAN E R A 2 165 35 5,759 10/05/2020 95 85 5100 LA ESPERANZA N 010 END AVENIDA DE LA PAZ R A 2 257 35 8,995 10/05/2020 70 61 5100 LA ESPERANZA N 020 AVENIDA DE LA PAZ AVENIDA PIZARRO R A 2 314 35 10,990 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 72 84 5100 LA ESPERANZA N 030 AVENIDA PIZARRO EL LEVANTE R A 2 399 35 13,965 03/07/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 87 89 5100 LA ESPERANZA N 040 EL LEVANTE AVENIDA PRESIDIO R A 2 570 35 29,855 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 10/05/2020 75 84 5100 LA ESPERANZA N 050 LA ESPERANZA S AVENIDA PRESIDIO R A 2 200 35 7,000 10/05/2020 98 85 4550 LA ESPERANZA S 010 AVENIDA PRESIDIO VISTA ENCANTA R A 2 229 35 8,015 10/05/2020 97 85 4550 LA ESPERANZA S 020 VISTA ENCANTA VISTA DEL PONTO R A 2 326 35 11,410 10/05/2020 98 85 4550 LA ESPERANZA S 030 VISTA DEL PONTO CALLE PATRICIA R A 2 540 35 18,900 10/05/2020 92 84 4550 LA ESPERANZA S 040 CALLE PATRICIA CALLE ESMARCA R A 2 1,185 35 41,475 10/05/2020 98 85 4550 LA ESPERANZA S 050 CALLE ESMARCA CALLE ALTA R A 2 56 35 1,960 10/05/2020 100 85 4550 LA ESPERANZA S 060 CALLE ALTA AVENIDA ARLENA R A 2 664 35 23,240 10/05/2020 98 85 4550 LA ESPERANZA S 070 AVENIDA ARLENA AVENIDA CORDOBA E R A 2 495 35 17,325 10/05/2020 98 85 110 LA PALOMA 010 END MARQUITA W R A 2 255 28 7,140 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 89 110 LA PALOMA 020 MARQUITA W MARIPOSA W R A 2 335 28 9,380 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 92 120 LA PALOMA 030 MARIPOSA W CALLE PUENTE R A 2 960 40 38,400 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 79 3720 LA PLACENTIA 010 AVENIDA DE LA ESTRELLA AVENIDA SIERRA R A 2 250 40 10,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 92 3720 LA PLACENTIA 020 AVENIDA SIERRA REVUELTA CT R A 2 240 40 9,600 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 93 93 3720 LA PLACENTIA 030 REVUELTA CT END R A 2 380 40 15,200 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 94 94 3255 LA RAMBLA 010 ESPLANADE POCO PASEO R A 2 498 39 19,422 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 95 3255 LA RAMBLA 020 POCO PASEO PASEO DE CRISTOBAL W R A 2 247 39 9,633 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 92 3255 LA RAMBLA 030 PASEO DE CRISTOBAL W BOCA DEL CANON R A 2 282 24 6,768 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 78 3255 LA RAMBLA 040 BOCA DEL CANON END R A 2 258 24 6,192 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 78 82 3670 LA RONDA 010 CHIQUITA EL PORTAL E R A 2 368 29 6,322 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 80 3670 LA RONDA 020 CHIQUITA CHIQUITA R A 2 472 29 13,688 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 80 3330 LA VENTANA 010 END VIA BREVE R O 2 258 40 10,320 04/07/2025 77 77 3330 LA VENTANA 020 VIA BREVE MONTE VISTA R O 2 485 40 19,400 04/07/2025 70 70 3330 LA VENTANA 030 MONTE VISTA END R A 2 653 40 26,120 03/26/2025 18CSC - MILL AND FILL (0.50') - Water Patch Repair 04/07/2025 73 73 4420 LADERA LN 010 END AVENIDA CORDOBA E R A 2 247 35 8,620 10/05/2020 70 63 3555 LINDA LN 020 ENCINO LN VIA MECHA R A 2 521 23 11,983 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 83 77 80 LINDA LN 010 VIA MECHA END R A 2 335 23 7,705 02/21/2023 71 66 1990 LLANO 010 RIACHUELO RIACHUELO R A 2 1,085 40 43,400 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 86 86 3560 LOMA LN 010 AVENIDA PALIZADA W AVENIDA PALIZADA W R A 2 967 19 18,373 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 89 85 1370 LOS BAUTISMOS LN 010 AVENIDA MAGDALENA E END R A 2 659 25 16,475 11/12/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 76 88 430 LOS OBREROS LN 010 CALLE DE LOS MOLINOS CALLE VALLE R A 2 1,108 35 38,669 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 84 80 3580 MARIPOSA E 010 EL CAMINO REAL N AVENIDA DE LA ESTRELLA R A 2 592 40 23,680 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 68 75 3590 MARIPOSA W 010 ESCALONES W LA PALOMA R A 2 478 40 19,120 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 95 92 3590 MARIPOSA W 020 LA PALOMA CALLE PUENTE R A 2 850 40 34,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 89 3590 MARIPOSA W 030 CALLE PUENTE EL CAMINO REAL N R A 2 1,600 40 64,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 86 88 3570 MARQUITA E 010 EL CAMINO REAL N AVENIDA DE LA ESTRELLA R A 2 431 29 12,499 02/21/2023 72 67 3575 MARQUITA W 010 LA PALOMA VIA MECHA R A 2 583 29 16,907 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 92 91 3575 MARQUITA W 020 VIA MECHA CALLE PUENTE R A 2 1,251 29 36,279 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 87 90 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 16 of 20 5/22/2025 395
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3575 MARQUITA W 030 CALLE PUENTE EL CAMINO REAL N R A 2 1,654 29 47,966 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 86 3320 MONTE VISTA 010 LA VENTANA CAMINO CAPISTRANO R A 2 770 39 30,030 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 85 85 3340 MONTEREY LN 010 AVENIDA VICTORIA CORONADO LN R A 2 116 25 2,900 05/01/2020 SLURRY SEAL 02/21/2023 74 69 3340 MONTEREY LN 020 CORONADO LN ALAMEDA LN R A 2 125 25 3,125 05/01/2020 SLURRY SEAL 02/21/2023 81 76 3340 MONTEREY LN 030 ALAMEDA LN SANTA ANA LN R A 2 110 25 2,750 05/01/2020 SLURRY SEAL 02/21/2023 76 72 3340 MONTEREY LN 040 SANTA ANA LN CORONA LN R A 2 226 25 5,650 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 02/21/2023 72 73 3340 MONTEREY LN 050 CORONA LN AVENIDA VICTORIA R A 2 613 25 15,325 10/01/2023 10CSC - MILL AND FILL (0.35' - 0.45') - 0% - 5% 02/21/2023 74 75 1755 NOVILLA 010 END ESTAMPIDA R A 2 195 39 7,605 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 2200 NOVILUNIO 010 END CALLE HERALDO R A 2 388 39 15,132 11/19/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 80 80 1780 OBRAJERO 010 END ESTAMPIDA R A 2 379 39 14,781 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1780 OBRAJERO 020 ESTAMPIDA ESTANCIA R A 2 438 39 17,082 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 85 85 3480 OLA VISTA N 010 AVENIDA PALIZADA W AVENIDA MIRAMAR R A 2 250 39 9,750 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 71 77 3480 OLA VISTA N 020 AVENIDA MIRAMAR AVENIDA SERRA R A 2 266 39 10,374 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 80 3480 OLA VISTA N 030 AVENIDA SERRA AVENIDA CABRILLO R A 2 256 39 9,984 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 78 3480 OLA VISTA N 040 AVENIDA CABRILLO AVENIDA DEL MAR R A 2 284 39 11,076 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 80 84 3380 OLA VISTA S 010 AVENIDA DEL MAR AVENIDA GRANADA R A 2 277 39 10,803 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 78 3380 OLA VISTA S 020 AVENIDA GRANADA AVENIDA VICTORIA R A 2 250 25 6,250 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 81 84 3380 OLA VISTA S 030 AVENIDA VICTORIA AVENIDA ROSA R A 2 250 25 6,250 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 79 84 3380 OLA VISTA S 040 AVENIDA ROSA AVENIDA SANTA BARBARA R A 2 224 25 5,600 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 87 85 3380 OLA VISTA S 050 AVENIDA SANTA BARBARA AVENIDA MONTEREY R A 2 273 39 10,647 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 85 87 3380 OLA VISTA S 060 AVENIDA MONTEREY AVENIDA MADRID R A 2 285 39 11,115 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 71 77 3380 OLA VISTA S 070 AVENIDA MADRID CAZADOR LN R A 2 66 39 2,574 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 72 77 3380 OLA VISTA S 080 CAZADOR LN TRAFALGAR LN R A 2 310 39 12,090 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 71 77 3380 OLA VISTA S 090 TRAFALGAR LN AVENIDA CADIZ W R A 2 133 39 5,187 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 70 76 3380 OLA VISTA S 100 AVENIDA CADIZ W AVENIDA BARCELONA R A 2 262 39 10,218 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 79 3380 OLA VISTA S 110 AVENIDA BARCELONA ESPLANADE R A 2 304 39 11,856 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 73 78 3380 OLA VISTA S 120 ESPLANADE AVENIDA SANTIAGO W R A 2 171 39 6,669 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 62 70 3380 OLA VISTA S 130 AVENIDA SANTIAGO W PASEO DE CRISTOBAL W R A 2 267 39 10,413 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 83 85 3380 OLA VISTA S 140 PASEO DE CRISTOBAL W AVENIDA CORDOBA W R A 2 328 39 12,792 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 82 84 3380 OLA VISTA S 150 AVENIDA CORDOBA W AVENIDA GAVIOTA W R A 2 327 39 12,753 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 80 3380 OLA VISTA S 160 AVENIDA GAVIOTA W AVENIDA GAVIOTA W R A 2 218 39 8,502 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 82 84 3380 OLA VISTA S 170 AVENIDA GAVIOTA W AVENIDA VALENCIA W R A 2 302 39 11,778 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 72 77 3380 OLA VISTA S 180 AVENIDA VALENCIA W AVENIDA PRINCESA R A 2 238 52 12,376 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 83 3380 OLA VISTA S 190 AVENIDA PRINCESA AVENIDA PRINCESA R A 2 145 52 7,540 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 82 84 3380 OLA VISTA S 200 AVENIDA PRINCESA AVENIDA DE LOS LOBOS MARINOS W R A 2 510 52 26,520 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 78 3380 OLA VISTA S 210 AVENIDA DE LOS LOBOS MARINOS W AVENIDA SAN ANTONIO W R A 2 515 52 26,780 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 79 81 3380 OLA VISTA S 230 AVENIDA SAN ANTONIO W AVENIDA ALESSANDRO W R A 2 210 25 5,250 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 81 83 3380 OLA VISTA S 240 AVENIDA ALESSANDRO W AVENIDA RAMONA W R A 2 274 25 6,475 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 80 3380 OLA VISTA S 260 AVENIDA RAMONA W AVENIDA CORNELIO W R A 2 219 25 5,475 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 80 3380 OLA VISTA S 270 AVENIDA CORNELIO W AVENIDA JUNIPERO W R A 2 250 25 6,250 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 80 3380 OLA VISTA S 280 AVENIDA JUNIPERO W PASEO DE LA SERENATA R A 2 372 30 11,160 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 76 80 3380 OLA VISTA S 290 PASEO DE LA SERENATA AVENIDA DE LA RIVIERA R A 2 332 20 6,640 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 79 3380 OLA VISTA S 300 AVENIDA DE LA RIVIERA CALLE DEL PACIFICO R A 2 416 30 12,480 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 74 79 3380 OLA VISTA S 310 CALLE DEL PACIFICO AVENIDA MAGDALENA W R A 2 356 30 10,680 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 75 80 3380 OLA VISTA S 320 AVENIDA MAGDALENA W AVENIDA CALAFIA R A 2 355 30 10,650 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 77 80 2120 OTERO 010 END CALLE HERALDO R A 2 406 39 15,834 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 2100 PANADERO 010 CALLE HERALDO END R A 2 185 40 7,400 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 79 79 3335 PASADENA CT 010 END CAZADOR LN R A 2 210 35 7,329 02/21/2023 63 59 3335 PASADENA CT 020 CAZADOR LN AVENIDA VICTORIA R A 2 192 35 6,701 02/21/2023 61 57 3310 PASEO DE CRISTOBAL 010 END ESPLANADE R A 2 358 52 18,616 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 70 76 3310 PASEO DE CRISTOBAL 020 ESPLANADE VISTA MARINA R A 2 672 52 34,944 01/30/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 72 81 3310 PASEO DE CRISTOBAL 030 VISTA MARINA LA RAMBLA R A 2 270 52 14,040 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 70 76 3310 PASEO DE CRISTOBAL 040 LA RAMBLA CALLE TOLEDO R A 2 517 40 20,680 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 70 76 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 17 of 20 5/22/2025 396
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 3310 PASEO DE CRISTOBAL 050 CALLE TOLEDO OLA VISTA S R A 2 953 39 37,167 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 63 70 3310 PASEO DE CRISTOBAL 060 OLA VISTA S EL CAMINO REAL S R A 2 1,092 39 42,588 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 66 73 1795 PASEO DE LA SERENATA 010 END OLA VISTA S R A 2 588 32 18,816 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 84 80 5117 PATERO DEL ORO 010 AVENIDA LA CUESTA EL LEVANTE R A 2 1,665 21 34,965 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 82 85 2180 PENASCO 010 CALLE HERALDO VIA BLANCO R A 2 2,310 33 76,230 04/07/2025 84 84 2180 PENASCO 020 VIA BLANCO END R A 2 168 33 5,544 04/07/2025 86 86 1695 PLAZA A LA PLAYA 010 END AVENIDA LA COSTA R A 2 167 34 9,248 02/21/2023 83 79 1695 PLAZA A LA PLAYA 020 AVENIDA LA COSTA END R A 2 162 34 5,508 02/21/2023 72 69 3240 POCO PASEO 010 LA RAMBLA ESPLANADE R A 2 390 35 13,650 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 94 92 1700 PORTICO DEL NORTE 010 ESTAMPIDA EMINENCIA DEL SUR R A 2 980 39 38,220 01/21/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 82 82 1700 PORTICO DEL NORTE 020 EMINENCIA DEL SUR CABALLISTA DEL NORTE R A 2 420 39 16,380 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 1700 PORTICO DEL NORTE 030 CABALLISTA DEL NORTE EMINENCIA DEL NORTE R A 2 223 39 8,697 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 91 91 1700 PORTICO DEL NORTE 040 EMINENCIA DEL NORTE CAMINO DE LOS MARES R A 2 1,387 39 54,093 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 81 81 1705 PORTICO DEL SUR 010 CAMINO DE LOS MARES SOMBREADO R A 2 1,613 39 62,907 01/16/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 84 84 1705 PORTICO DEL SUR 020 SOMBREADO ESTAMPIDA R A 2 907 39 35,373 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 85 85 6350 PUERTA DEL SOL 010 AVENIDA VISTA HERMOSA CALLE ALICANTE R A 2 1,419 24 34,056 04/03/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 77 77 6580 PUERTA DEL SOL 010 END AVENIDA VISTA HERMOSA R A 2 297 20 5,940 04/07/2025 89 89 1800 REBANO 010 END BONANZA R A 2 551 39 21,489 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 90 90 3650 REVUELTA CT 010 END LA PLACENTIA R A 2 264 24 6,336 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 91 91 2000 RIACHUELO 010 RIACHUELO RIACHUELO R A 2 1,080 40 43,200 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 81 81 2000 RIACHUELO 020 RIACHUELO LLANO R A 2 345 40 13,800 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 85 85 2000 RIACHUELO 030 LLANO CERCA R A 2 925 40 37,000 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 92 92 2000 RIACHUELO 040 CERCA LLANO R A 2 300 40 12,000 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 89 89 2000 RIACHUELO 050 LLANO RIACHUELO R A 2 275 40 11,000 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 82 82 2000 RIACHUELO 060 RIACHUELO RIACHUELO R A 2 350 40 14,000 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 87 87 2000 RIACHUELO 070 RIACHUELO CALLE SARMENTOSO R A 2 202 40 8,080 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 85 85 2000 RIACHUELO 080 CAMINO VERA CRUZ RIACHUELO R A 2 140 40 5,600 04/07/2025 88 88 2000 RIACHUELO 090 END RIACHUELO R A 2 121 40 4,840 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 91 91 460 RINCON CT 010 END CALLE DE LOS MOLINOS R A 2 395 39 15,405 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 79 83 3360 SANTA ANA LN 010 AVENIDA DEL MAR CAPISTRANO LN R A 2 315 25 7,875 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 93 88 3360 SANTA ANA LN 020 CAPISTRANO LN MONTEREY LN R A 2 168 25 4,200 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 90 87 1650 SOMBREADO 010 END ALTURA R A 2 275 40 11,000 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 87 87 1650 SOMBREADO 020 ALTURA INCLINADO R A 2 195 40 7,800 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 92 92 1650 SOMBREADO 030 INCLINADO PORTICO DEL SUR R A 2 168 40 6,720 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 94 94 5010 TERRAZA VISTA BAHIA 010 END EL LEVANTE R A 2 194 32 6,208 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 89 94 3250 TRAFALGAR LN 010 ESPLANADE OLA VISTA S R A 2 1,125 29 32,625 08/06/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 92 91 3250 TRAFALGAR LN 020 OLA VISTA S EL CAMINO REAL S R A 2 1,756 29 50,924 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 02/21/2023 96 89 1820 VACUNO 010 ARREOS CABALLISTA DEL SUR R A 2 271 39 10,569 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 94 94 3040 VIA ALEGRE 010 VIA MONTEGO VIA LADO R A 2 590 39 23,010 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 86 86 3040 VIA ALEGRE 020 VIA LADO VIA BANDITA R A 2 182 35 6,370 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 86 86 3040 VIA ALEGRE 030 VIA BANDITA VIA VISTOSA R A 2 172 35 6,020 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 89 89 3040 VIA ALEGRE 040 VIA VISTOSA VIA VERBENA R A 2 151 35 5,285 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 3040 VIA ALEGRE 050 VIA VERBENA VIA MONTECITO R A 2 163 35 5,705 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 3040 VIA ALEGRE 060 VIA MONTECITO VIA SANTO TOMAS R A 2 147 35 5,145 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 89 89 3040 VIA ALEGRE 070 VIA SANTO TOMAS VIA CASA LOMA R A 2 155 35 5,425 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 86 86 3040 VIA ALEGRE 080 VIA CASA LOMA VIA ARBOLEDA R A 2 152 35 5,320 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 77 77 3040 VIA ALEGRE 090 VIA ARBOLEDA VIA MONTEZUMA R A 2 143 35 5,005 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 3040 VIA ALEGRE 100 VIA MONTEZUMA END R A 2 231 35 8,085 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 78 78 2260 VIA AMAPOLA 010 END CALLE PIEDRAS R A 2 187 27 5,049 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 94 2260 VIA AMAPOLA 020 CALLE PIEDRAS CALLE NUEVO R A 2 1,405 27 37,935 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 78 91 2970 VIA ARBOLEDA 010 VIA MONTEGO VIA ALEGRE R A 2 1,009 31 31,279 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 87 87 6680 VIA ARTEMESIA 010 AVENIDA COSTA AZUL VIA BELLAS ARTES R A 2 698 36 25,128 04/07/2025 91 91 6680 VIA ARTEMESIA 020 VIA BELLAS ARTES VIA MURILLO R A 2 937 32 29,984 04/07/2025 90 90 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 18 of 20 5/22/2025 397
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 6680 VIA ARTEMESIA 030 VIA MURILLO END R A 2 592 32 18,944 04/07/2025 94 94 4430 VIA AVILA 010 AVENIDA CORDOBA E END R A 2 185 33 6,105 10/05/2020 81 76 930 VIA BALLENA 010 VIA CASCADITA VIA SOCORRO R A 2 2,295 33 75,735 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 85 85 3020 VIA BANDITA 020 VIA MONTEGO VIA ALEGRE R A 2 784 31 24,304 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 89 89 2240 VIA BELLOTA 010 END CALLE PIEDRAS R A 2 777 27 20,979 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 75 90 2190 VIA BLANCO 010 END CALLE HERALDO R A 2 771 27 20,817 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 80 80 2190 VIA BLANCO 020 CALLE HERALDO CALLE VALLARTA R A 2 512 40 20,480 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 82 82 2190 VIA BLANCO 030 CALLE VALLARTA PENASCO R A 2 1,012 40 40,480 10/03/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 81 81 2190 VIA BLANCO 040 PENASCO CAMINO VERA CRUZ R A 2 196 40 7,840 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 85 85 3305 VIA BREVE 010 LA VENTANA CAMINO CAPISTRANO R O 2 300 39 11,700 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 83 6500 VIA CALLEJON 010 END AVENIDA LA PATA R A 2 732 24 17,568 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 80 91 2977 VIA CASA LOMA 010 VIA MONTEGO VIA ALEGRE R A 2 1,056 31 32,736 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 92 92 900 VIA CASCADITA 010 AVENIDA VAQUERO VIA MONTEGO R A 2 261 40 10,440 04/07/2025 96 96 900 VIA CASCADITA 020 VIA MONTEGO VIA SENDA R A 2 929 40 37,160 04/07/2025 97 97 900 VIA CASCADITA 030 VIA SENDA CALLE TINAJA R A 2 158 40 6,320 04/07/2025 98 97 900 VIA CASCADITA 040 CALLE TINAJA VIA BALLENA R A 2 167 40 6,680 04/07/2025 97 97 900 VIA CASCADITA 050 VIA BALLENA VIA SAN ANDREAS R A 2 170 40 6,800 04/07/2025 94 94 900 VIA CASCADITA 060 VIA SAN ANDREAS VIA SOCORRO R A 2 107 40 4,280 04/07/2025 99 98 4450 VIA CATALINA 010 END AVENIDA CORDOBA E R A 2 285 33 9,405 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 90 2500 VIA CHUECA 010 END CALLE CHUECA R O 2 150 35 5,250 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 76 76 3980 VIA CISCO 010 AVENIDA ACAPULCO VIA ZAPATA R A 2 183 39 7,137 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 83 87 3980 VIA CISCO 020 VIA ZAPATA VIA TOLUCA R A 2 282 32 9,024 01/04/2023 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 80 86 3980 VIA CISCO 030 VIA TOLUCA CITY LIMIT R A 2 59 36 3,744 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 87 88 4040 VIA COLIBRI 010 AVENIDA SAN PABLO END R A 2 288 32 9,216 10/05/2020 97 85 3092 VIA CORBINA 010 END CALLE VISTA TORITO R A 2 535 31 16,585 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 81 81 1175 VIA DEL CAMPO 010 CALLE BIENVENIDO VIA MANZANA R A 2 1,032 31 31,992 05/01/2020 SLURRY SEAL 04/07/2025 92 92 4090 VIA DELFIN 010 AVENIDA SAN PABLO END R O 2 466 35 16,263 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 97 91 4110 VIA ENSUENO 010 END AVENIDA SAN PABLO R O 2 785 33 25,905 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 93 95 2530 VIA HIDALGO 010 END CALLE HIDALGO R O 2 121 35 4,235 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 83 83 6630 VIA JUAREZ 010 END CALLE JUAREZ R O 2 128 37 4,736 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 84 84 4440 VIA LA JOLLA 010 AVENIDA CORDOBA E END R A 2 450 33 14,850 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 90 4570 VIA LA MESA 020 END AVENIDA CORDOBA E R A 2 134 33 4,422 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 90 3025 VIA LADO 010 VIA MONTEGO VIA ALEGRE R A 2 563 31 17,453 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1170 VIA MANZANA 010 CITY LIMIT CALLE BIENVENIDO R A 2 340 31 10,540 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 82 82 1170 VIA MANZANA 020 CALLE BIENVENIDO CALLE REAL R A 2 1,759 31 54,529 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 1170 VIA MANZANA 030 CALLE REAL VIA DEL CAMPO R O 2 811 31 62,589 05/01/2020 GRIND AND OVERLAY 04/07/2025 93 93 3545 VIA MECHA 010 LINDA LN MARQUITA W R A 2 414 23 9,522 02/21/2023 83 79 4100 VIA MIMOSA 010 END AVENIDA SAN PABLO R A 2 400 35 13,960 10/05/2020 89 81 3070 VIA MONTECITO 010 AVENIDA VAQUERO VIA MONTEGO R A 2 724 31 22,444 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 84 84 3070 VIA MONTECITO 020 VIA MONTEGO VIA ALEGRE R A 2 1,080 31 33,480 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 3085 VIA MONTEGO 010 VIA CASCADITA VIA ALEGRE R A 2 480 40 19,200 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 3085 VIA MONTEGO 020 VIA ALEGRE VIA LADO R A 2 275 40 11,000 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 83 3085 VIA MONTEGO 030 VIA LADO VIA BANDITA R A 2 215 40 8,600 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 85 85 3085 VIA MONTEGO 040 VIA BANDITA VIA VISTOSA R A 2 190 40 7,600 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 83 3085 VIA MONTEGO 050 VIA VISTOSA VIA VERBENA R A 2 175 40 7,000 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 80 80 3085 VIA MONTEGO 060 VIA VERBENA VIA MONTECITO R A 2 148 40 5,920 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 81 81 3085 VIA MONTEGO 070 VIA MONTECITO VIA SANTO TOMAS R A 2 157 40 6,280 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 87 87 3085 VIA MONTEGO 080 VIA SANTO TOMAS VIA CASA LOMA R A 2 155 40 6,200 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 83 83 3085 VIA MONTEGO 090 VIA CASA LOMA VIA ARBOLEDA R A 2 170 40 6,800 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 3085 VIA MONTEGO 100 VIA ARBOLEDA VIA MONTEZUMA R A 2 177 40 7,080 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 86 86 2960 VIA MONTEZUMA 010 VIA MONTEGO VIA ALEGRE R A 2 984 40 39,360 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 2270 VIA MORADA 010 END CALLE NUEVO R A 2 500 39 19,500 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 82 94 3338 VIA NADA 010 END CALLE GRANDE VISTA R A 2 244 35 8,540 02/10/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 89 89 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 19 of 20 5/22/2025 398
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Local Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 490 VIA PICO PLZ 010 AVENIDA PICO END R O 2 704 32 22,528 01/15/2021 GRIND AND OVERLAY 02/21/2023 85 82 4000 VIA PROMONTORIO 010 AVENIDA ACAPULCO END R A 2 768 39 29,952 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 62 82 4500 VIA ROBINA 010 CALLE PATRICIA END R A 2 324 33 10,692 11/20/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 10/05/2020 71 68 1070 VIA SACRAMENTO 010 CITY LIMIT CALLE ABRIL R A 2 169 40 6,760 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 90 90 1070 VIA SACRAMENTO 020 CALLE ABRIL CALLE MAYO R A 2 166 40 6,640 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 82 82 1070 VIA SACRAMENTO 030 CALLE MAYO CALLE JUNO R A 2 177 40 7,080 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 91 91 920 VIA SAN ANDREAS 010 VIA CASCADITA VIA BALLENA R A 2 1,970 33 65,010 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 87 87 3110 VIA SAN GORGONIO 010 AVENIDA VAQUERO VIA SAN JACINTO R A 2 197 40 7,880 01/31/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 60 60 3110 VIA SAN GORGONIO 020 VIA SAN JACINTO CALLE VISTA TORITO R A 2 1,255 40 50,200 01/31/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 04/07/2025 59 59 3096 VIA SAN JACINTO 010 VIA SAN GORGONIO CALLE VISTA TORITO R A 2 1,373 31 42,563 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 2980 VIA SANTO TOMAS 010 VIA MONTEGO VIA ALEGRE R A 2 1,091 31 33,821 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 85 85 890 VIA SENDA 010 END VIA CASCADITA R O 2 326 33 10,758 12/02/2024 06CSC - CRACK SEAL (LF) 04/07/2025 86 86 935 VIA SOCORRO 010 CAMINO SAN CLEMENTE VIA CASCADITA R A 2 160 30 4,800 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 75 90 935 VIA SOCORRO 020 VIA CASCADITA VIA BALLENA R A 2 1,938 30 58,140 05/03/2025 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 70 86 6300 VIA SUERTE 010 AVENIDA VISTA HERMOSA CALLE CAMPANERO R A 2 692 40 27,680 11/01/2021 09CSC - TYPE (II) RAP SLURRY SEAL 3% PMCQS 04/07/2025 86 86 3970 VIA TOLUCA 010 END VIA CISCO R A 2 825 39 32,175 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 84 87 3000 VIA VERBENA 010 VIA MONTEGO VIA ALEGRE R A 2 1,067 31 33,077 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 86 86 3010 VIA VISTOSA 010 VIA MONTEGO VIA ALEGRE R A 2 1,004 31 31,124 11/01/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 04/07/2025 88 88 3990 VIA ZAPATA 010 VIA CISCO END R A 2 670 39 26,130 05/02/2022 07CSC - TYPE (I) SLURRY SEAL 3% PMCQS 10/05/2020 62 73 4590 VISTA ALCEDO 010 END VISTA VALINDA R O 2 274 31 8,494 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 97 91 4580 VISTA CANTORA 010 VISTA VALINDA END R O 2 553 32 17,696 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 96 91 4460 VISTA CAYENTA 010 VISTA VALINDA AVENIDA BUENA SUERTE R A 2 923 39 35,997 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 90 6420 VISTA MARINA 010 ESPLANADE PASEO DE CRISTOBAL W R A 2 502 20 10,040 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 92 91 6420 VISTA MARINA 020 ESPLANADE END R A 2 400 20 8,000 12/02/2024 06CSC - CRACK SEAL (LF) 02/21/2023 83 87 4600 VISTA VALINDA 010 END VISTA CAYENTA R A 2 225 39 8,775 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 90 4600 VISTA VALINDA 020 VISTA CAYENTA VISTA CANTORA R A 2 195 36 7,020 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 99 90 4600 VISTA VALINDA 030 VISTA CANTORA VISTA ALCEDO R A 2 275 36 9,900 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 99 90 4600 VISTA VALINDA 040 VISTA ALCEDO AVENIDA SALVADOR R A 2 808 36 29,088 12/02/2024 06CSC - CRACK SEAL (LF) 10/05/2020 98 90 R - Residential/Local A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete P - Portland Cement Concrete 20 of 20 5/22/2025 399
Appendix 1-
Network
400
City of San Clemente 2025 Pavement Management Program Update Section Description Inventory Alley Network Sorted by Name Street ID Street Name Section ID Beg Location End Location Functional Class Surface Type # Lanes Length (LF) Width (LF) Area (SF) Last Treatment Date Last Treatment Type Last Inspection Date Inspected PCI Calculated PCI (2025) 6460 ALLEY 010 BOCA DE LA PLAYA AVENIDA FLORENCIA O O 2 1,158 20 23,160 01/06/2025 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 74 75 6460 ALLEY 020 AVENIDA DE LA GRULLA AVENIDA ARAGON O O 2 551 20 11,020 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 79 76 6460 ALLEY 030 AVENIDA ARAGON EL PORTAL W O O 2 205 20 4,100 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 82 79 6460 ALLEY 035 EL PORTAL E CANADA E O O 2 260 24 6,240 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 10/05/2020 61 90 6460 ALLEY 040 ESCALONES E MARIPOSA E O O 2 261 20 5,220 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 02/21/2023 96 92 6460 ALLEY 050 MARIPOSA E MARQUITA E O O 2 250 20 5,000 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 02/21/2023 92 88 6460 ALLEY 070 MARQUITA W AVENIDA PALIZADA W O O 2 546 20 10,920 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 02/21/2023 87 84 6460 ALLEY 080 AVENIDA PALIZADA W AVENIDA MIRAMAR O O 2 306 20 6,120 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 02/21/2023 71 68 6460 ALLEY 090 AVENIDA MIRAMAR AVENIDA SERRA O O 2 257 20 5,140 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 02/21/2023 87 84 6460 ALLEY 100 AVENIDA SERRA AVENIDA CABRILLO O O 2 245 20 4,900 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 86 83 6460 ALLEY 110 AVENIDA CABRILLO AVENIDA DEL MAR O A 2 243 20 4,860 02/21/2023 55 50 6460 ALLEY 120 AVENIDA DEL MAR AVENIDA GRANADA O A 2 238 20 4,760 12/01/2023 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 58 66 6460 ALLEY 130 ESCALONES W MARIPOSA W O O 2 200 20 4,000 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 90 86 6460 ALLEY 140 CANADA W ESCALONES W O O 2 350 20 7,000 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 94 87 6460 ALLEY 150 MARIPOSA W MARQUITA W O O 2 330 20 7,000 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 85 82 6460 ALLEY 160 AVENIDA GRANADA AVENIDA VICTORIA O A 2 246 20 4,920 02/21/2023 51 46 6460 ALLEY 170 AVENIDA VICTORIA AVENIDA ROSA O O 2 212 20 4,240 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 90 86 6460 ALLEY 180 AVENIDA ROSA AVENIDA MATEO O O 2 211 20 4,220 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 87 84 6460 ALLEY 190 AVENIDA MATEO AVENIDA ALGODON O A 2 225 20 4,500 02/21/2023 34 27 6460 ALLEY 200 AVENIDA ALGODON TRAFALGAR LN O O 2 304 20 6,080 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 02/21/2023 91 87 6460 ALLEY 210 TRAFALGAR LN AVENIDA CADIZ W O O 2 307 20 6,140 11/01/2022 16CSC - GRIND AND 0.35' AC OVERLAY W/ BASE REPAIR 02/21/2023 80 77 6460 ALLEY 220 AVENIDA BARCELONA ESPLANADE O O 2 265 20 5,300 11/01/2022 15CSC - GRIND AND 0.25' AC OVERLAY W/ BASE REPAIR 02/21/2023 86 83 6460 ALLEY 230 ESPLANADE AVENIDA SANTIAGO W O O 2 254 20 5,080 10/01/2023 11CSC - MILL AND FILL (0.35' - 0.45') - 5% - 10% 02/21/2023 87 86 6460 ALLEY 240 AVENIDA SANTIAGO W PASEO DE CRISTOBAL W O O 2 257 20 5,140 11/01/2022 16CSC - GRIND AND 0.35' AC OVERLAY W/ BASE REPAIR 02/21/2023 84 81 6460 ALLEY 250 PASEO DE CRISTOBAL AVENIDA CORDOBA W O O 2 262 20 5,240 11/01/2022 16CSC - GRIND AND 0.35' AC OVERLAY W/ BASE REPAIR 02/21/2023 93 85 6460 ALLEY 260 AVENIDA CORDOBA W AVENIDA GAVIOTA W O O 2 260 20 5,200 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 02/21/2023 94 87 6460 ALLEY 270 AVENIDA GAVIOTA W AVENIDA VALENCIA W O O 2 266 20 5,320 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 02/21/2023 74 71 6460 ALLEY 280 AVENIDA VALENCIA W END O O 2 238 20 4,760 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 02/21/2023 88 85 6460 ALLEY 290 AVENIDA SAN ANTONIO W AVENIDA RAMONA W O O 2 274 20 5,480 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 31 90 6460 ALLEY 300 AVENIDA RAMONA W AVENIDA CORNELIO W O O 2 252 20 5,040 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 35 90 6460 ALLEY 310 AVENIDA CORNELIO W AVENIDA JUNIPERO W O O 2 320 20 6,400 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 49 90 6460 ALLEY 320 AVENIDA JUNIPERO W AVENIDA SAN GABRIEL W O O 2 340 19 6,460 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 32 90 6460 ALLEY 330 AVENIDA DE LOS LOBOS MARINOS W AVENIDA PRINCESA O O 2 519 19 9,861 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 86 83 6460 ALLEY 340 AVENIDA SAN GABRIEL E AVENIDA MAGDALENA E O A 2 946 20 38,780 10/05/2020 59 50 6460 ALLEY 350 AVENIDA SAN GABRIEL E AVENIDA MAGDALENA E O A 2 875 20 36,160 10/05/2020 55 45 6460 ALLEY 360 EL CAMINO REAL S CALLE DEL COMERCIO O O 2 154 23 3,542 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 38 90 6460 ALLEY 370 AVENIDA SAN LUIS REY AVENIDA SANTA INEZ O A 2 223 20 4,460 10/05/2020 96 85 6460 ALLEY 380 AVENIDA SANTA INEZ AVENIDA DOMINGUEZ O O 2 224 20 4,480 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 46 90 6460 ALLEY 390 AVENIDA DOMINGUEZ AVENIDA SAN DIMAS O O 2 215 20 4,300 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 28 90 6460 ALLEY 400 AVENIDA SAN DIMAS AVENIDA SAN FERNANDO O O 2 223 20 4,460 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 41 90 6460 ALLEY 410 AVENIDA SAN FERNANDO AVENIDA BUENA VENTURA O O 2 225 20 4,500 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 29 90 6460 ALLEY 420 AVENIDA BUENA VENTURA AVENIDA DOLORES O O 2 213 20 4,260 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 32 90 6460 ALLEY 430 AVENIDA DOLORES AVENIDA SAN DIEGO O O 2 221 20 4,420 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 65 90 6460 ALLEY 450 AVENIDA CARMELO AVENIDA LUCIA O A 2 254 19 4,826 10/05/2020 86 82 6460 ALLEY 460 AVENIDA CADIZ W AVENIDA BARCELONA O A 2 270 20 5,400 05/22/2024 01CSC - MILL AND FILL (0.20') - 0% - 5% 02/21/2023 93 87 6460 ALLEY 470 ESCALONES W MARIPOSA W O O 2 201 20 4,020 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 89 85 6460 ALLEY 480 CANADA W ESCALONES W O O 2 243 20 4,860 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 90 86 6460 ALLEY 490 AVENIDA DEL PONIENTE CANADA W O O 2 266 20 5,320 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 84 81 6460 ALLEY 500 EL PORTAL W AVENIDA DEL PONIENTE O O 2 171 20 3,420 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 02/21/2023 88 85 6460 ALLEY 510 AVENIDA SAN DIEGO AVENIDA LUCIA O O 2 205 20 4,100 11/01/2022 13CSC - GRIND AND 0.15' AC OVERLAY W/ BASE REPAIR 10/05/2020 36 90 6460 ALLEY 520 CALLE MARINA CALLE SERENA O O 2 262 20 5,240 11/01/2022 14CSC - GRIND AND 0.2' AC OVERLAY WITH BASE REPAIR 10/05/2020 52 90 6460 ALLEY 530 OLA VISTA N ALLEY EO EL CAMINO REAL O A 2 805 20 16,100 10/05/2020 24 8 O - Other (Alley) A - Asphalt Concrete, O - Asphalt Concrete Overlay of Existing Asphalt Concrete 1 of 1 5/22/2025 401
Appendix 2
7-Year Work Plan per Scenario 1
402
Appendix 2-A
Seven-Year Work Plan for MPAH Network
403
404
405
406
Appendix 2-B
Seven-Year Work Plan for Local Network
407
408
409
410
411
412
413
414
415
416
417
418
419
420
Appendix 2-
Seven-Year Work Plan for Network
421
422
Appendix 3
OCTA Pavement Management Plan Agency Submittal
423

City of San Clemente
Pavement
Management Plan
Prepared by: NCE
Submitted to OCTA: 6-30-2025
424
Pavement Management Plan Agency Submittal
P a g e | 1
Agency Submittal Table of Contents
I. Pavement Management Plan Certification ..................................................................................................... 2 II. Executive Summary ......................................................................................................................................... 3 III. Background ..................................................................................................................................................... 4 IV. Current Pavement Conditions (PCI) ................................................................................................................ 5 V. Projected Pavement Conditions (PCI) ............................................................................................................. 5 VI. Alternative Funding Levels .............................................................................................................................. 6 Maintain Existing Average Network PCI .......................................................................................................... 6 Improve Average Network PCI ......................................................................................................................... 6 VII. Current and Projected Backlog by Year of Pavement Maintenance Needs ................................................... 7 VIII. Centerline Mileage .......................................................................................................................................... 7 IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles ............................. 8 X. Reduction in Local Match ................................................................................................................................ 9 XI. Appendix A – Seven-Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level and Maintenance of Current System PCIs ............................................................................. 10 XII. Appendix B – Complete Listing of Current Street Conditions ....................................................................... 11 XIII. Appendix C – GIS Digital Data ....................................................................................................................... 12 Introduction ................................................................................................................................................... 12 Structure of GIS Data ..................................................................................................................................... 12 XIV. Appendix D – Quality Assurance/Quality Control Plan ................................................................................. 14 Introduction ................................................................................................................................................... 14 Objectives ...................................................................................................................................................... 14 Structure of QA/QC Plan ................................................................................................................................ 14 Condition Survey Procedures ......................................................................................................................... 15 Accuracy Required for Data Collection .......................................................................................................... 16 Random and Systematic Re-Inspections ........................................................................................................ 16 PCI Comparison with Past Surveys ................................................................................................................. 17 Inspector’s Qualifications and Experience ..................................................................................................... 17 Safety Procedures .......................................................................................................................................... 17 XV. Appendix E – Pavement Management Data Files ......................................................................................... 19 XVI. Appendix F – GIS Maps – Current Conditions (Optional) .............................................................................. 19 425
Pavement Management Plan Agency Submittal
P a g e | 2
I. Pavement Management Plan Certification
The City of San Clemente certifies that it has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed Measure M (M2).

The plan was developed by the City of San Clemente using StreetSaver®, a pavement management system, confirming to American Society of Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the following elements:

Inventory of MPAH and local routes reviewed and updated biennially. The last update of the inventory was completed on November, 2024 for Arterial (MPAH) streets and local streets.

Assessment of pavement condition for all routes in the system, updated biennially. The last field review of pavement condition was completed on April, 2025.

Percentage of all sections of pavement needing:

Preventative Maintenance: 87.9%
Rehabilitation: 12.0%
Reconstruction: 0.1%
Budget needs for Preventative Maintenance, Rehabilitation, and/or Reconstruction of deficient sections of pavement for:

Current biennial period $16.17 million
Following biennial period $6.56 million
Funds budgeted or available for Preventative Maintenance, Rehabilitation, and/or Reconstruction:

Current biennial period $9.25 million
Following biennial period $10.10 million
Backlog by year of unfunded pavement rehabilitation, restoration, and reconstruction needs.

The Pavement Management Plan is consistent with countywide pavement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors.
*An electronic copy of the Pavement Management Plan (with Micro Paver or StreetSaver compatible files) has been, or will be, submitted with the certification statement.

A copy of this certification is being provided to the Orange County Transportation Authority.

Submitted by:

Kiel Koger City of San Clemente
Name (Print) Jurisdiction
6/30/2025
Signed Date
Public Work Director
Title (Public Works Director and/or City Engineer)
426
Pavement Management Plan Agency Submittal
P a g e | 3
II. Executive Summary
The City of San Clemente performs biennial updates of its Pavement Management Plan (PMP) to assist policy makers in making decisions for street maintenance as well as complying with the Orange County Transportation Authority (OCTA)’s Measure M2 Program. This report summarizes findings from the 2025 PMP Update.

The City is responsible for maintaining approximately 137.8 centerline miles of streets, representing a substantial investment of approximately $657.8 million. The street network includes 26.2 miles of MPAH streets and 111.6 miles of local streets. In April 2025, NCE performed a condition survey for the City’s street network. The City monitors pavement conditions by collecting pavement distresses in compliance with ASTM D64331and as outlined by OCTA in the “Countywide Pavement Management Plan Guidelines”2. Table 1 below summarizes the network’s streets by Pavement Condition Index (PCI) and functional classification.

Table 1. Network Summary Statistics by Functional Class Functional Class Centerline
Mileage
Percent
Area
Weighted
Average PCI Condition
MPAH 26.2 30.4 84 Good
Local 111.6 69.6 83 Good
Total 137.8 100.0% 83 Good
The City of San Clemente Street Network's 2025 weighted average (by area) PCI is 83. Overall, 45.8 percent of the City’s Street Network area is in “Very Good” condition, 42.1 percent is in “Good” condition, 10.1 percent is in “Fair” condition, 1.9 percent is in “Poor” condition, and 0.1 percent is in “Very Poor” condition.

Three budget scenarios were analyzed using an inflation rate of 4.5% from 2025 to 2031. 1 ASTM. "ASTM D6433." Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys. 2 OCTA. Countywide Pavement Management Plan Guidelines Manual. March 2024. 427
Pavement Management Plan Agency Submittal
P a g e | 4
III. Background
PMPs are “designed to provide objective information and useful data for analysis so that managers can make
more consistent, cost-effective, and defensible decisions related to the preservation of a pavement network.”3 A PMP is designed to assist cities and counties by answering typical questions such as: • What does the City’s pavement network consist of in terms of miles and area? • What is the current Pavement Condition Index (PCI)4 of the public street pavement network? • What are the City’s current maintenance and rehabilitation strategies? • How much funding is required to perform all needed M&R treatments over the next several years? • How will the condition of the pavement network change over time given existing M&R strategies and funding levels? • How much additional funding is needed to maintain or improve the current pavement condition throughout the network?
3 AASHTO “Guidelines for Pavement Management Systems”. American Association of State Highway and Transportation Officials, Washington DC, July 1990. 4 The weighted average PCI is a result of multiplying the area of each street section by the PCI of that section, totaling the sections together and then dividing by the total of the network areas or functional classification. 428
Pavement Management Plan Agency Submittal
P a g e | 5
IV. Current Pavement Conditions (PCI)
Current Network PCI Current MPAH PCI Current Local PCI
83 84 83
V. Projected Pavement Conditions (PCI)
Should be by projected PCI by year under existing or expected funding levels for next seven fiscal years (“Today” is before June 30, 2024).

Fiscal Year Current Funding Entire Network
PCI MPAH Local
Today 5.50 million 83 84 83
2025-26 4.20 million 85 86 85
2026-27 5.05 million 84 84 84
2027-28 5.05 million 83 83 83
2028-29 5.05 million 82 81 83
2029-30 5.05 million 81 80 82
2030-31 5.05 million 80 79 81
2031-32 5.05 million 80 78 80
429
Pavement Management Plan Agency Submittal
P a g e | 6
VI. Alternative Funding Levels
Maintain Existing Average Network PCI
Fiscal Year Maintain
Funding
Entire Network
PCI MPAH Local
Today 5.5 million 83 84 83
2025-26 4.20 million 85 85 85
2026-27 5.05 million 84 84 84
2027-28 7.00 million 83 82 84
2028-29 7.00 million 83 82 83
2029-30 7.00 million 83 83 83
2030-31 7.00 million 83 83 83
2031-32 4.62 million 83 81 83
Improve Average Network PCI
Fiscal Year Current Funding Entire Network
PCI MPAH Local
Today 5.5 million 83 84 83
2025-26 4.20 million 85 85 85
2026-27 5.05 million 84 84 84
2027-28 8.00 million 83 82 84
2028-29 8.00 million 83 84 83
2029-30 8.00 million 84 84 84
2030-31 6.32 million 84 83 84
2031-32 7.50 million 84 82 85
430
Pavement Management Plan Agency Submittal
P a g e | 7
VII. Current and Projected Backlog by Year of Pavement Maintenance Needs
Fiscal Year Current Funding
Backlog Maintain PCI Backlog Increase PCI Backlog
Current 13.34 million 13.34 million 13.34 million
2025-26 9.12 million 9.10 million 9.12 million
2026-27 8.38 million 8.35 million 8.38 million
2027-28 10.97 million 9.00 million 8.02 million
2028-29 9.90 million 5.89 million 3.87 million
2029-30 12.68 million 6.54 million 3.43 million
2030-31 11.87 million 3.29 million 0.25 million
2031-32 9.82 million 0.17 million 0.17 million
VIII. Centerline Mileage
Entire Pavement Network MPAH Local Roads
137.8 26.2 111.6
431
Pavement Management Plan Agency Submittal
P a g e | 8
IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles
Condition
Category PCI Range Network
Percent
Area of
Total
Pavement
Area of
Pavement
(sf)
Percent
Centerline
Mileage of
Network
Centerline
Mileage of
Network
Very Good 86-100
MPAH 14.3% 4,368,528

45.6%

12.7 Local 31.5% 9,614,232 50.0
Good 75-85
MPAH 13.7% 4,184,508

41.6%

11.3 Local 28.4% 8,679,904 46.0
Fair 60-74
MPAH 1.8% 543,441

10.8%

1.8 Local 8.3% 2,531,839 13.2
Poor 41-59
MPAH 0.5% 152,992

1.8%

0.4 Local 1.4% 433,782 2.1
Very Poor 0-40
MPAH 0.0% 0

0.2%

0.0 Local 0.1% 27,113 0.2
432
Pavement Management Plan Agency Submittal
P a g e | 9
X. Reduction in Local Match
A local agency match reduction of 10% of the eligible cost for Project O submitted for consideration of funding through the Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial Highways (MPAH) or local street categories;
or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.

The City’s PCI meets the requirements as noted in the preceding paragraph (b) by keeping the PCI greater than 75, with the MPAH and Local street network showing PCI greater than 80. The City will therefore be eligible for the 10 percent reduction in local matching fund requirements. 433
Pavement Management Plan Agency Submittal
P a g e | 10
XI. Appendix A Seven-Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level and Maintenance of Current System PCIs
The seven-year plan for road maintenance and rehabilitation should be based on current and projected budget.

Street sections selected for treatment should be identified here. Specific data to be submitted should follow the format below:

MPAH
Limits of Work
Street Name From To Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
LOCAL
Limits of Work
Street Name From To Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
Please attach the seven-year road maintenance and rehabilitation plan, following the above template, after this sheet. The plan should be labeled Appendix A.
434
Appendix A-1
Seven-Year Work Plan for MPAH Network
435
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding MPAH Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment AVENIDA VISTA HERMOSA I 5 BRIDGE CALLE FRONTERA 750 64 48,000 CRACK SEAL AND SLURRY SEAL 28,853 $ 2025 AVENIDA VISTA HERMOSA VIA SUERTE AVENIDA TALEGA 734 64 46,976 CRACK SEAL AND SLURRY SEAL 28,238 $ 2025 AVENIDA VISTA HERMOSA PARK ACCESS ROAD AVENIDA COSTA AZUL 730 80 58,400 CRACK SEAL AND SLURRY SEAL 35,105 $ 2025 EL CAMINO REAL S AVENIDA ALGODON TRAFALGAR LN 345 56 19,320 CRACK SEAL AND SLURRY SEAL 11,613 $ 2025 EL CAMINO REAL S TRAFALGAR LN AVENIDA CADIZ W 300 56 16,800 CRACK SEAL AND SLURRY SEAL 10,099 $ 2025 EL CAMINO REAL S AVENIDA CADIZ W AVENIDA BARCELONA 265 56 14,840 CRACK SEAL AND SLURRY SEAL 8,920 $ 2025 EL CAMINO REAL S AVENIDA BARCELONA ESPLANADE 305 56 17,080 CRACK SEAL AND SLURRY SEAL 10,267 $ 2025 EL CAMINO REAL S AVENIDA CORDOBA W AVENIDA GAVIOTA W 238 56 13,328 CRACK SEAL AND SLURRY SEAL 8,012 $ 2025 EL CAMINO REAL S AVENIDA MAGDALENA E CALLE DEL COMERCIO 320 56 17,920 CRACK SEAL AND SLURRY SEAL 10,772 $ 2025 EL CAMINO REAL S CALLE DEL COMERCIO AVENIDA SAN LUIS REY 1,435 56 80,360 CRACK SEAL AND SLURRY SEAL 48,305 $ 2025 EL CAMINO REAL S AVENIDA SANTA INEZ AVENIDA DOMINGUEZ 245 56 13,720 CRACK SEAL AND SLURRY SEAL 8,247 $ 2025 EL CAMINO REAL S AVENIDA DOMINGUEZ AVENIDA SAN DIMAS 255 56 14,280 CRACK SEAL AND SLURRY SEAL 8,584 $ 2025 EL CAMINO REAL S AVENIDA SAN DIMAS AVENIDA SAN FERNANDO 240 56 13,440 CRACK SEAL AND SLURRY SEAL 8,079 $ 2025 EL CAMINO REAL S AVENIDA SAN FERNANDO AVENIDA BUENA VENTURA 260 56 14,560 CRACK SEAL AND SLURRY SEAL 8,752 $ 2025 EL CAMINO REAL S AVENIDA BUENA VENTURA AVENIDA DOLORES 250 56 14,000 CRACK SEAL AND SLURRY SEAL 8,416 $ 2025 EL CAMINO REAL S AVENIDA LUCIA AVENIDA CARMELO 250 56 14,000 CRACK SEAL AND SLURRY SEAL 8,416 $ 2025 EL CAMINO REAL S AVENIDA CARMELO AVENIDA PALA 246 56 13,776 CRACK SEAL AND SLURRY SEAL 8,281 $ 2025 AVENIDA PICO CALLE DE INDUSTRIAS AVENIDA NAVARRO 253 63 15,939 CRACK SEAL AND SLURRY SEAL 9,581 $ 2025 EL CAMINO REAL N AVENIDA ESTACION AVENIDA PICO 622 66 41,052 CRACK SEAL AND SLURRY SEAL 24,677 $ 2025 EL CAMINO REAL N BOCA DE LA PLAYA CALLE LAGO 116 56 4,648 CRACK SEAL AND SLURRY SEAL 2,794 $ 2025 EL CAMINO REAL N AVENIDA PALIZADA W AVENIDA MIRAMAR 450 56 25,200 CRACK SEAL AND SLURRY SEAL 15,148 $ 2025 EL CAMINO REAL S AVENIDA GAVIOTA W AVENIDA VALENCIA W 237 56 13,272 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 140,093 $ 2025 EL CAMINO REAL S AVENIDA SAN LUIS REY AVENIDA SANTA INEZ 260 56 14,560 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 153,689 $ 2025 EL CAMINO REAL S AVENIDA DOLORES AVENIDA SAN DIEGO 270 56 15,120 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 159,600 $ 2025 EL CAMINO REAL S AVENIDA SAN DIEGO AVENIDA LUCIA 250 56 14,000 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 147,778 $ 2025 EL CAMINO REAL S AVENIDA PALA AVENIDA SANTA MARGARITA 249 56 13,944 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 147,187 $ 2025 EL CAMINO REAL S AVENIDA SANTA MARGARITA CITY LIMIT 410 56 59,360 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 626,578 $ 2025 AVENIDA VISTA HERMOSA I 5 S EXIT I 5 BRIDGE 270 64 17,280 CRACK SEAL AND SLURRY SEAL 10,855 $ 2026 AVENIDA VISTA HERMOSA I 5 S EXIT 77 PARK ACCESS ROAD 520 103 53,560 CRACK SEAL AND SLURRY SEAL 33,644 $ 2026 EL CAMINO REAL S AVENIDA DEL MAR AVENIDA GRANADA 285 56 15,960 CRACK SEAL AND SLURRY SEAL 10,025 $ 2026 EL CAMINO REAL S AVENIDA ROSA AVENIDA MATEO 253 56 14,168 CRACK SEAL AND SLURRY SEAL 8,900 $ 2026 EL CAMINO REAL S AVENIDA MATEO AVENIDA ALGODON 290 56 16,240 CRACK SEAL AND SLURRY SEAL 10,201 $ 2026 EL CAMINO REAL S ESPLANADE AVENIDA SANTIAGO W 285 56 15,960 CRACK SEAL AND SLURRY SEAL 10,025 $ 2026 EL CAMINO REAL S AVENIDA SANTIAGO W PASEO DE CRISTOBAL W 235 56 13,160 CRACK SEAL AND SLURRY SEAL 8,267 $ 2026 EL CAMINO REAL S PASEO DE CRISTOBAL W AVENIDA CORDOBA W 250 56 14,000 CRACK SEAL AND SLURRY SEAL 8,794 $ 2026 EL CAMINO REAL N CALLE VALLE AVENIDA ARAGON 357 56 19,992 CRACK SEAL AND SLURRY SEAL 12,558 $ 2026 EL CAMINO REAL N MARIPOSA W MARIPOSA E 50 56 2,800 CRACK SEAL AND SLURRY SEAL 1,759 $ 2026 EL CAMINO REAL N MARQUITA E AVENIDA PALIZADA W 447 56 31,584 CRACK SEAL AND SLURRY SEAL 19,840 $ 2026 EL CAMINO REAL N AVENIDA MIRAMAR AVENIDA SERRA 265 56 14,840 CRACK SEAL AND SLURRY SEAL 9,322 $ 2026 EL CAMINO REAL N AVENIDA CABRILLO AVENIDA DEL MAR 275 56 15,400 CRACK SEAL AND SLURRY SEAL 9,674 $ 2026 EL CAMINO REAL S AVENIDA SAN JUAN E AVENIDA SAN ANTONIO W 195 56 10,920 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 13,060 $ 2026 EL CAMINO REAL S AVENIDA SAN ANTONIO W AVENIDA SAN ANTONIO E 105 56 5,880 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 7,032 $ 2026 EL CAMINO REAL S AVENIDA SAN ANTONIO E AVENIDA RAMONA W 200 56 11,200 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 13,395 $ 2026 EL CAMINO REAL S AVENIDA RAMONA W AVENIDA CORNELIO W 262 56 14,672 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 17,547 $ 2026 EL CAMINO REAL S AVENIDA CORNELIO W AVENIDA JUNIPERO W 328 56 18,368 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 21,967 $ 2026 EL CAMINO REAL S AVENIDA JUNIPERO W AVENIDA SAN PABLO 162 56 9,072 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 10,850 $ 2026 EL CAMINO REAL S AVENIDA SAN PABLO AVENIDA SAN GABRIEL W 199 56 11,144 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 13,328 $ 2026 EL CAMINO REAL S AVENIDA SAN GABRIEL W AVENIDA SAN GABRIEL E 201 56 11,256 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 13,462 $ 2026 EL CAMINO REAL S AVENIDA SAN GABRIEL E INTERSTATE #5 650 56 36,400 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 43,532 $ 2026 EL CAMINO REAL S INTERSTATE #5 AVENIDA MENDOCINO 425 56 23,800 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 28,463 $ 2026 AVENIDA PICO CALLE AMANECER AVENIDA LA PATA 3,550 88 312,400 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 373,613 $ 2026 AVENIDA VAQUERO CAMINO CAPISTRANO VIA CASCADITA 314 55 17,270 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 20,654 $ 2026 CAMINO VERA CRUZ VIA BLANCO CARRETERA 751 64 48,064 CRACK SEAL AND SLURRY SEAL 31,551 $ 2027 CAMINO DE ESTRELLA INTERSTATE #5 BRIDGE CALLE NARANJA 365 70 32,640 CRACK SEAL AND SLURRY SEAL 21,426 $ 2027 EL CAMINO REAL S AVENIDA PRESIDIO AVENIDA ROSA 93 56 5,208 CRACK SEAL AND SLURRY SEAL 3,419 $ 2027 EL CAMINO REAL N AVENIDA PICO BOCA DE LA PLAYA 397 56 22,232 CRACK SEAL AND SLURRY SEAL 14,594 $ 2027 EL CAMINO REAL N AVENIDA FLORENCIA AVENIDA DE LA GRULLA 738 56 41,328 CRACK SEAL AND SLURRY SEAL 27,129 $ 2027 EL CAMINO REAL N AVENIDA DEL PONIENTE CANADA W 285 56 15,960 CRACK SEAL AND SLURRY SEAL 10,477 $ 2027 EL CAMINO REAL N ESCALONES W MARIPOSA W 208 56 11,648 CRACK SEAL AND SLURRY SEAL 7,646 $ 2027 MPAH Limits of Work 1 of 2 436
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding MPAH Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment MPAH Limits of Work EL CAMINO REAL S AVENIDA VALENCIA W INTERSTATE #5 430 56 24,080 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 277,568 $ 2027 EL CAMINO REAL S AVENIDA MENDOCINO AVENIDA MAGDALENA E 785 56 43,960 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 506,724 $ 2027 AVENIDA PICO AVENIDA PRESIDIO CALLE DEL CERRO 1,100 88 96,800 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 120,977 $ 2027 AVENIDA PICO CALLE DEL CERRO CALLE AMANECER 2,410 88 212,080 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 265,050 $ 2027 AVENIDA PICO CALLE AMANECER AVENIDA LA PATA 3,550 88 312,400 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 390,426 $ 2027 AVENIDA PICO AVENIDA LA PATA THE COURTYARDS 680 85 66,270 08CSC TYPE (II) SLURRY SEAL 3% PMCQS 82,822 $ 2027 CAMINO DE LOS MARES CALLE NARANJA CAMINO EL MOLINO 350 70 27,130 CRACK SEAL AND SLURRY SEAL 18,610 $ 2028 AVENIDA VISTA HERMOSA AVENIDA PLATANAR CAMINO LAUREL 890 64 56,960 CRACK SEAL AND SLURRY SEAL 39,073 $ 2028 AVENIDA VISTA HERMOSA AVENIDA LA PATA BRIDGE 366 64 23,424 CRACK SEAL AND SLURRY SEAL 16,068 $ 2028 AVENIDA VISTA HERMOSA BRIDGE VIA CANON VERDE 800 80 64,000 CRACK SEAL AND SLURRY SEAL 43,902 $ 2028 AVENIDA VISTA HERMOSA VIA CANON VERDE AVENIDA PICO 820 80 65,600 CRACK SEAL AND SLURRY SEAL 44,999 $ 2028 EL CAMINO REAL S AVENIDA GRANADA AVENIDA VICTORIA 253 56 14,168 CRACK SEAL AND SLURRY SEAL 9,719 $ 2028 AVENIDA TALEGA AVENIDA VISTA HERMOSA CALLE PORTOFINO 1,011 62 62,682 CRACK SEAL AND SLURRY SEAL 42,998 $ 2028 EL CAMINO REAL N AVENIDA ARAGON EL PORTAL W 306 56 17,136 CRACK SEAL AND SLURRY SEAL 11,755 $ 2028 EL CAMINO REAL N MARIPOSA E MARQUITA W 190 56 10,640 CRACK SEAL AND SLURRY SEAL 7,299 $ 2028 EL CAMINO REAL N AVENIDA SERRA AVENIDA CABRILLO 240 56 13,440 CRACK SEAL AND SLURRY SEAL 9,219 $ 2028 CAMINO DE LOS MARES CALLE AGUA MARBELLA 1,820 70 148,245 CRACK SEAL AND SLURRY SEAL 106,267 $ 2029 CAMINO VERA CRUZ CALLE AQUAMARINA CALLE PARADISO 1,423 64 91,072 CRACK SEAL AND SLURRY SEAL 65,284 $ 2029 CAMINO MIRA COSTA CALLE BORREGO CAMINO ALONDRA 469 63 29,547 CRACK SEAL AND SLURRY SEAL 21,180 $ 2029 AVENIDA PICO CALLE DE LOS MOLINOS CALLE DE INDUSTRIAS 460 63 28,980 CRACK SEAL AND SLURRY SEAL 20,774 $ 2029 EL CAMINO REAL N CALLE LAGO CALLE DE LOS MOLINOS 595 56 33,320 CRACK SEAL AND SLURRY SEAL 23,885 $ 2029 EL CAMINO REAL N CALLE DE LOS MOLINOS AVENIDA FLORENCIA 535 56 29,960 CRACK SEAL AND SLURRY SEAL 21,476 $ 2029 EL CAMINO REAL N CANADA W ESCALONES W 293 56 16,408 CRACK SEAL AND SLURRY SEAL 11,762 $ 2029 AVENIDA VAQUERO CALLE GRANDE VISTA VIA MONTECITO 270 55 14,850 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 186,927 $ 2029 CAMINO DE LOS MARES MARBELLA AVENIDA VAQUERO 1,065 70 94,680 CRACK SEAL AND SLURRY SEAL 70,924 $ 2030 CAMINO DE LOS MARES CAMINO VERA CRUZ ESTANCIA 1,245 63 78,435 CRACK SEAL AND SLURRY SEAL 58,755 $ 2030 CAMINO DE LOS MARES ESTANCIA BONANZA 1,041 63 65,583 CRACK SEAL AND SLURRY SEAL 49,128 $ 2030 CAMINO VERA CRUZ AVENIDA VISTA HERMOSA CALLE AQUAMARINA 459 64 29,376 CRACK SEAL AND SLURRY SEAL 22,005 $ 2030 CAMINO VERA CRUZ CALLE PARADISO VIA PACIFICA 290 64 18,560 CRACK SEAL AND SLURRY SEAL 13,903 $ 2030 CAMINO MIRA COSTA CALLE LA VETA CAMINO CAPISTRANO 738 63 46,494 CRACK SEAL AND SLURRY SEAL 34,828 $ 2030 CAMINO CAPISTRANO AVENIDA VAQUERO PACIFIC COAST HWY 607 65 39,455 CRACK SEAL AND SLURRY SEAL 29,555 $ 2030 EL CAMINO REAL S AVENIDA VICTORIA AVENIDA PRESIDIO 182 56 10,192 CRACK SEAL AND SLURRY SEAL 7,635 $ 2030 AVENIDA PICO THE COURTYARDS AVENIDA VISTA HERMOSA 2,077 88 186,430 CRACK SEAL AND SLURRY SEAL 139,654 $ 2030 AVENIDA LA PATA VIA ONDA AVENIDA VISTA HERMOSA 2,371 96 227,616 CRACK SEAL AND SLURRY SEAL 170,506 $ 2030 AVENIDA LA PATA CALLE AMANECER CALLE DEL CERRO 1,150 64 73,600 CRACK SEAL AND SLURRY SEAL 55,133 $ 2030 AVENIDA LA PATA AVENIDA VISTA HERMOSA CALLE SALUDA 2,053 64 131,392 CRACK SEAL AND SLURRY SEAL 98,425 $ 2030 AVENIDA TALEGA CALLE PORTOFINO BRIDGE 1,300 62 80,600 CRACK SEAL AND SLURRY SEAL 60,377 $ 2030 EL CAMINO REAL N AVENIDA DE LA GRULLA CALLE VALLE 335 56 18,760 CRACK SEAL AND SLURRY SEAL 14,053 $ 2030 EL CAMINO REAL N EL PORTAL W AVENIDA DEL PONIENTE 117 56 6,552 CRACK SEAL AND SLURRY SEAL 4,908 $ 2030 EL CAMINO REAL N MARIPOSA W MARQUITA E 107 56 5,992 CRACK SEAL AND SLURRY SEAL 4,489 $ 2030 AVENIDA VAQUERO VIA SAN GORGONIO CALLE ARCO 285 55 15,675 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 206,191 $ 2030 AVENIDA VAQUERO CALLE VICENTE CAMINO DE LOS MARES 218 55 11,990 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 157,718 $ 2030 CAMINO DE LOS MARES CAMINO EL MOLINO CALLE AGUA 725 70 49,760 CRACK SEAL AND SLURRY SEAL 38,952 $ 2031 CAMINO DE LOS MARES CALLE NUEVO PORTICO DEL SUR 1,436 60 86,160 CRACK SEAL AND SLURRY SEAL 67,446 $ 2031 CAMINO DE LOS MARES BONANZA PORTICO DEL NORTE 1,513 63 95,319 CRACK SEAL AND SLURRY SEAL 74,616 $ 2031 AVENIDA VISTA HERMOSA CALLE FRONTERA AVENIDA PLATANAR 391 64 25,024 CRACK SEAL AND SLURRY SEAL 19,589 $ 2031 AVENIDA VISTA HERMOSA CAMINO LA PEDRIZA AVENIDA PICO 918 64 58,752 CRACK SEAL AND SLURRY SEAL 45,991 $ 2031 CAMINO MIRA COSTA CALLE GUAYMAS CALLE BORREGO 489 63 30,807 CRACK SEAL AND SLURRY SEAL 24,116 $ 2031 CAMINO MIRA COSTA CAMINO ALONDRA CALLE LA VETA 567 63 35,721 CRACK SEAL AND SLURRY SEAL 27,963 $ 2031 CAMINO DE ESTRELLA CALLE HERMOSA CAMINO MIRA COSTA 785 78 57,850 CRACK SEAL AND SLURRY SEAL 45,285 $ 2031 CAMINO CAPISTRANO VIA BREVE MONTE VISTA 511 40 20,440 CRACK SEAL AND SLURRY SEAL 16,000 $ 2031 CAMINO CAPISTRANO MONTE VISTA AVENIDA VAQUERO 1,230 65 79,950 CRACK SEAL AND SLURRY SEAL 62,585 $ 2031 AVENIDA PICO INTERSTATE #5 CALLE FRONTERA 2,284 88 200,992 CRACK SEAL AND SLURRY SEAL 157,337 $ 2031 AVENIDA PICO CALLE ALICANTE CAMINO CELOSIA 2,020 88 177,760 CRACK SEAL AND SLURRY SEAL 139,151 $ 2031 AVENIDA PICO CAMINO CELOSIA CAMINO LA PEDRIZA 1,649 88 145,112 CRACK SEAL AND SLURRY SEAL 113,594 $ 2031 AVENIDA PICO CAMINO LA PEDRIZA END 1,550 20 31,000 CRACK SEAL AND SLURRY SEAL 24,267 $ 2031 AVENIDA LA PATA AVENIDA PICO VIA ONDA 693 64 44,352 CRACK SEAL AND SLURRY SEAL 34,719 $ 2031 EL CAMINO REAL N CAMINO SAN CLEMENTE AVENIDA ESTACION 4,050 66 267,300 CRACK SEAL AND SLURRY SEAL 209,243 $ 2031 EL CAMINO REAL S INTERSTATE #5 AVENIDA SAN JUAN E 406 56 22,736 RECONSTRUCT STRUCTURE (AC) 509,919 $ 2031 2 of 2 437
Appendix A-2
Seven-Year Work Plan for Local Network
438
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment CALLE AMIGO CALLE DESCANSO END 144 35 5,040 CRACK SEAL AND SLURRY SEAL 3,030 $ 2025 AVENIDA SAN ANTONIO W AVENIDA ALESSANDRO W OLA VISTA S 1,010 23 23,230 CRACK SEAL AND SLURRY SEAL 13,964 $ 2025 AVENIDA ALESSANDRO W AVENIDA SAN ANTONIO W OLA VISTA S 972 23 22,356 CRACK SEAL AND SLURRY SEAL 13,438 $ 2025 LA VENTANA VIA BREVE MONTE VISTA 485 40 19,400 CRACK SEAL AND SLURRY SEAL 11,662 $ 2025 LA VENTANA MONTE VISTA END 653 40 26,120 CRACK SEAL AND SLURRY SEAL 15,701 $ 2025 ALAMEDA LN AVENIDA DEL MAR AVENIDA DEL MAR 556 30 16,680 CRACK SEAL AND SLURRY SEAL 10,027 $ 2025 AVENIDA GRANADA AVENIDA DEL MAR AVENIDA CABRILLO 587 40 23,480 CRACK SEAL AND SLURRY SEAL 14,114 $ 2025 AVENIDA VICTORIA CORONA LN AVENIDA MADRID 220 40 8,800 CRACK SEAL AND SLURRY SEAL 5,290 $ 2025 AVENIDA VICTORIA AVENIDA MADRID AVENIDA MONTEREY 239 40 9,560 CRACK SEAL AND SLURRY SEAL 5,747 $ 2025 AVENIDA VICTORIA AVENIDA MONTEREY AVENIDA SANTA BARBARA 343 40 13,720 CRACK SEAL AND SLURRY SEAL 8,247 $ 2025 AVENIDA VICTORIA AVENIDA ROSA OLA VISTA N 1,002 40 40,080 CRACK SEAL AND SLURRY SEAL 24,093 $ 2025 AVENIDA VICTORIA OLA VISTA S EL CAMINO REAL S 795 40 31,800 CRACK SEAL AND SLURRY SEAL 19,115 $ 2025 AVENIDA CABRILLO AVENIDA PALIZADA W CALLE SEVILLE N 837 24 20,088 CRACK SEAL AND SLURRY SEAL 12,075 $ 2025 AVENIDA CABRILLO CALLE SEVILLE N OLA VISTA N 1,116 40 44,640 CRACK SEAL AND SLURRY SEAL 26,834 $ 2025 AVENIDA CABRILLO OLA VISTA N EL CAMINO REAL N 1,017 40 40,680 CRACK SEAL AND SLURRY SEAL 24,453 $ 2025 CALLE MIRADOR AVENIDA FLORENCIA AVENIDA DEL REPOSO 239 29 6,931 CRACK SEAL AND SLURRY SEAL 4,166 $ 2025 CALLE SEVILLE N AVENIDA PALIZADA W AVENIDA CABRILLO 256 40 10,240 CRACK SEAL AND SLURRY SEAL 6,155 $ 2025 CALLE SEVILLE N AVENIDA CABRILLO AVENIDA DEL MAR 273 40 10,920 CRACK SEAL AND SLURRY SEAL 6,564 $ 2025 AVENIDA PALIZADA W AVENIDA CABRILLO ARENOSO LN 205 40 8,200 CRACK SEAL AND SLURRY SEAL 4,929 $ 2025 AVENIDA PALIZADA W ARENOSO LN ENCINO LN 567 40 22,680 CRACK SEAL AND SLURRY SEAL 13,633 $ 2025 EL ORIENTE AVENIDA CABALLEROS AVENIDA DE LA PAZ 460 54 24,840 CRACK SEAL AND SLURRY SEAL 14,932 $ 2025 EL PORTAL W BUENA VISTA AVENIDA DEL PONIENTE 995 40 39,800 CRACK SEAL AND SLURRY SEAL 23,924 $ 2025 EL PORTAL E EL CAMINO REAL N LA RONDA 211 39 8,229 CRACK SEAL AND SLURRY SEAL 4,947 $ 2025 EL PORTAL E LA RONDA LA RONDA 454 39 17,706 CRACK SEAL AND SLURRY SEAL 10,643 $ 2025 EL PORTAL E LA RONDA CANADA E 300 39 11,700 CRACK SEAL AND SLURRY SEAL 7,033 $ 2025 EL PORTAL E CANADA E AVENIDA DE LA ESTRELLA 280 39 10,920 CRACK SEAL AND SLURRY SEAL 6,564 $ 2025 CALLE VALLE CALLE BONITO EL CAMINO REAL N 700 29 20,300 CRACK SEAL AND SLURRY SEAL 12,203 $ 2025 AVENIDA RAMONA E OLA VISTA S AVENIDA DEL PRESIDENTE 1,209 23 27,807 CRACK SEAL AND SLURRY SEAL 16,715 $ 2025 ENTRADA PARAISO CALLE REGLA AVENIDA JUNIPERO E 165 33 5,445 CRACK SEAL AND SLURRY SEAL 3,273 $ 2025 ENTRADA PARAISO AVENIDA JUNIPERO E END 435 33 14,355 CRACK SEAL AND SLURRY SEAL 8,629 $ 2025 AVENIDA SALVADOR AVENIDA SAN JUAN E AVENIDA SAN PABLO 3,077 39 120,003 CRACK SEAL AND SLURRY SEAL 72,135 $ 2025 AVENIDA COLUMBO AVENIDA TERESA AVENIDA SALVADOR 274 33 9,042 CRACK SEAL AND SLURRY SEAL 5,435 $ 2025 AVENIDA PALIZADA E EL CAMINO REAL N AVENIDA DE LA ESTRELLA 192 40 7,680 CRACK SEAL AND SLURRY SEAL 4,617 $ 2025 AVENIDA PALIZADA E AVENIDA DE LA ESTRELLA I 5 SB EXIT RAMP 579 63 36,477 CRACK SEAL AND SLURRY SEAL 21,927 $ 2025 AVENIDA DE LA PAZ SOLANO EL ORIENTE 850 35 29,750 CRACK SEAL AND SLURRY SEAL 17,883 $ 2025 CALLE DEL CERRO AVENIDA VISTA MONTANA LORCA 775 44 34,100 CRACK SEAL AND SLURRY SEAL 20,498 $ 2025 CALLE DEL CERRO CAMINO IBIZA AVENIDA VISTA MONTANA 2,025 36 72,900 CRACK SEAL AND SLURRY SEAL 43,821 $ 2025 CALLE ALICANTE PUERTA DEL SOL CALLE BATIDO 379 24 9,096 CRACK SEAL AND SLURRY SEAL 5,468 $ 2025 LINDA LN VIA MECHA END 335 23 7,705 CRACK SEAL AND SLURRY SEAL 4,632 $ 2025 AVENIDA DEL MAR ALAMEDA LN SANTA ANA LN 103 39 4,017 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 42,402 $ 2025 AVENIDA MAGDALENA W OLA VISTA S AVENIDA DEL PRESIDENTE 204 35 7,120 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 48,258 $ 2025 AVENIDA CALAFIA BEACH PARK ENTRANCE AVENIDA MONTALVO 1,075 39 41,925 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 284,158 $ 2025 AVENIDA FLORENCIA AVENIDA PELAYO AVENIDA DE LA GRULLA 265 40 10,600 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 71,844 $ 2025 AVENIDA VALENCIA W CALLE TOLEDO OLA VISTA S 995 40 39,800 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 269,756 $ 2025 MONTEREY LN AVENIDA VICTORIA CORONADO LN 116 25 2,900 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 19,656 $ 2025 OLA VISTA S ESPLANADE AVENIDA SANTIAGO W 171 39 6,669 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 45,201 $ 2025 VIA ZAPATA VIA CISCO END 670 39 26,130 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 177,103 $ 2025 AVENIDA COLUMBO AVENIDA SALVADOR END 740 33 24,420 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 165,513 $ 2025 AVENIDA PICO BOCA DE LA PLAYA CALLE DESHECHA 300 49 14,700 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 99,633 $ 2025 AVENIDA CABALLEROS EL ORIENTE AVENIDA PALIZADA W 616 33 20,328 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 137,779 $ 2025 CALLE FAMILIA CALLE EMPALME END 215 31 6,665 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 45,174 $ 2025 AVENIDA COTA AVENIDA COSTANSO BEND 825 21 17,325 CRACK SEAL AND SLURRY SEAL 10,883 $ 2026 AVENIDA VICTORIA CAZADOR LN CORONA LN 457 40 18,280 CRACK SEAL AND SLURRY SEAL 11,483 $ 2026 AVENIDA VICTORIA AVENIDA SANTA BARBARA AVENIDA ROSA 350 40 14,000 CRACK SEAL AND SLURRY SEAL 8,794 $ 2026 Local Limits of Work 1 of 12 439
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work CALLE VALLE CALLE DE LOS MOLINOS LOS OBREROS LN 165 29 4,785 CRACK SEAL AND SLURRY SEAL 3,006 $ 2026 AVENIDA RAMONA E EL CAMINO REAL S ENTRADA PARAISO 827 29 23,983 CRACK SEAL AND SLURRY SEAL 15,065 $ 2026 CALLE DEL CERRO AVENIDA PICO AVENIDA VISTA MONTANA 2,300 50 115,000 CRACK SEAL AND SLURRY SEAL 72,239 $ 2026 AVENIDA VICTORIA AVENIDA DEL MAR MONTEREY LN 570 40 22,800 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 251,497 $ 2026 AVENIDA DEL PRESIDENTE AVENIDA VALENCIA W AVENIDA PRINCESA 218 53 11,554 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 81,834 $ 2026 AVENIDA DEL PRESIDENTE AVENIDA RAMONA W AVENIDA CORNELIO W 280 32 8,960 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 63,462 $ 2026 CORTO LN END AVENIDA PALIZADA W 235 35 8,202 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 58,093 $ 2026 AVENIDA DE LA ESTRELLA AVENIDA SIERRA CALLE REDONDEL 241 40 9,640 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 68,278 $ 2026 AVENIDA DE LA ESTRELLA CALLE REDONDEL CALLE REDONDEL 222 40 8,880 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 62,895 $ 2026 AVENIDA SAN CARLOS CALLE CORTEZ CALLE DE ANZA 341 33 11,253 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 79,702 $ 2026 AVENIDA PICO CALLE DESHECHA EL CAMINO REAL N 145 49 7,105 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 50,323 $ 2026 CALLE REAL CALLE ANDALUCIA VIA DEL CAMPO 395 40 15,800 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,896 $ 2026 CALLE REAL VIA MANZANA VIA DEL CAMPO 684 40 27,360 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 32,721 $ 2026 CALLE BIENVENIDO CITY LIMIT CALLE ABRIL 242 40 9,680 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,577 $ 2026 CALLE BIENVENIDO CALLE ABRIL CALLE MAYO 178 40 7,120 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,515 $ 2026 CALLE BIENVENIDO CALLE MAYO CALLE JUNO 441 40 17,640 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 21,096 $ 2026 CALLE BIENVENIDO CALLE JUNO VIA MANZANA 1,196 40 47,840 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 57,214 $ 2026 CALLE BIENVENIDO VIA MANZANA CALLE ANDALUCIA 808 40 32,320 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 38,653 $ 2026 VIA MANZANA CALLE BIENVENIDO CALLE REAL 1,759 31 54,529 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 65,214 $ 2026 VIA MANZANA CALLE REAL VIA DEL CAMPO 811 31 62,589 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 74,853 $ 2026 VIA DEL CAMPO CALLE BIENVENIDO VIA MANZANA 1,032 31 31,992 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 38,261 $ 2026 CALLE VICENTE END AVENIDA VAQUERO 1,261 32 40,352 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 48,259 $ 2026 PLAZA A LA PLAYA END AVENIDA LA COSTA 167 34 9,248 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,060 $ 2026 PLAZA A LA PLAYA AVENIDA LA COSTA END 162 34 5,508 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,587 $ 2026 CALLE MONACO AVENIDA LA COSTA AVENIDA DE LA RIVIERA 316 34 10,744 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,849 $ 2026 CALLE LAS PALMAS AVENIDA LA COSTA AVENIDA DE LA RIVIERA 428 35 14,980 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 17,915 $ 2026 AVENIDA LA COSTA PLAZA A LA PLAYA CALLE MONTE CRISTO 709 39 27,651 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 33,069 $ 2026 AVENIDA LA COSTA CALLE MONTE CRISTO CALLE MONACO 324 35 11,340 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,562 $ 2026 AVENIDA LA COSTA CALLE MONACO CALLE LAS PALMAS 282 35 9,870 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,804 $ 2026 CALLE CAPRI END AVENIDA DE LA RIVIERA 150 28 4,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 5,023 $ 2026 CALLE MAJORCA END AVENIDA DE LA RIVIERA 223 35 7,805 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,334 $ 2026 CALLE MONTE CRISTO AVENIDA LA COSTA AVENIDA DE LA RIVIERA 421 35 14,735 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 17,622 $ 2026 CALLE MADIERA END AVENIDA DE LA RIVIERA 165 29 4,785 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 5,723 $ 2026 AVENIDA DE LA RIVIERA END CALLE CAPRI 200 49 9,800 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,720 $ 2026 AVENIDA DE LA RIVIERA CALLE CAPRI CALLE MADIERA 157 49 7,693 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,200 $ 2026 AVENIDA DE LA RIVIERA CALLE MADIERA CALLE MONACO 116 49 5,684 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,798 $ 2026 AVENIDA DE LA RIVIERA CALLE MONACO CALLE MONTE CARLO 142 49 6,958 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,321 $ 2026 AVENIDA DE LA RIVIERA CALLE MONTE CARLO CALLE LAS PALMAS 119 49 5,831 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,974 $ 2026 AVENIDA DE LA RIVIERA CALLE LAS PALMAS CALLE MAJORCA 190 49 9,310 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,134 $ 2026 AVENIDA DE LA RIVIERA CALLE MAJORCA OLA VISTA S 297 49 14,553 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 17,405 $ 2026 BELLO PANORAMA CAMINO VERA CRUZ END 667 32 21,344 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 25,526 $ 2026 CHARCO END CAMPO RASO 244 35 8,516 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,185 $ 2026 CAMPO RASO CALLE HERALDO CHARCO 1,054 40 42,160 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 50,421 $ 2026 CAMPO RASO CHARCO COSTA 195 40 7,800 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,328 $ 2026 CAMPO RASO COSTA END 525 40 21,000 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 25,115 $ 2026 COSTA CAMPO RASO CAMINO VERA CRUZ 162 35 5,654 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,762 $ 2026 PANADERO CALLE HERALDO END 185 40 7,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,850 $ 2026 CAMINANTE END CALLE HERALDO 209 35 7,294 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,723 $ 2026 OTERO END CALLE HERALDO 406 39 15,834 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,937 $ 2026 ARROYO END CALLE HERALDO 824 39 32,136 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 38,433 $ 2026 PENASCO CALLE HERALDO VIA BLANCO 2,310 33 76,230 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 91,167 $ 2026 PENASCO VIA BLANCO END 168 33 5,544 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,630 $ 2026 ARBOLADO CAMINO VERA CRUZ END 580 32 18,560 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,197 $ 2026 VIA BLANCO END CALLE HERALDO 771 27 20,817 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 24,896 $ 2026 2 of 12 440
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work VIA BLANCO CALLE HERALDO CALLE VALLARTA 512 40 20,480 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 24,493 $ 2026 CANADA W CALLE PUENTE EL CAMINO REAL N 1,302 40 52,080 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 62,285 $ 2026 NOVILUNIO END CALLE HERALDO 388 39 15,132 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,097 $ 2026 CALLE PUENTE CANADA W ESCALONES W 468 40 18,720 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,388 $ 2026 CALLE PUENTE ESCALONES W MARIPOSA W 252 40 10,080 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,055 $ 2026 CALLE PUENTE MARIPOSA W LA PALOMA 260 40 10,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,438 $ 2026 CALLE PUENTE LA PALOMA MARQUITA W 280 40 11,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,395 $ 2026 CALLE PUENTE MARQUITA W AVENIDA PALIZADA W 305 40 12,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 14,591 $ 2026 CALLE GANADERO END CALLE FRONTERA 693 35 24,255 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 29,008 $ 2026 CALLE FIERROS END CALLE FRONTERA 625 35 21,875 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 26,161 $ 2026 CALLE CUMBRE END CALLE VALLARTA 243 35 8,481 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,143 $ 2026 CALLE REATA END CALLE GUADALAJARA 600 35 21,000 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 25,115 $ 2026 CALLE CORRAL END CALLE GUADALAJARA 161 35 5,619 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,720 $ 2026 VIA CHUECA END CALLE CHUECA 150 35 5,250 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,279 $ 2026 CALLE CHUECA END CALLE GAUCHO 183 35 6,405 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,660 $ 2026 CALLE CHUECA CALLE GAUCHO VIA CHUECA 335 35 11,725 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 14,022 $ 2026 CALLE CHUECA VIA CHUECA END 281 35 9,835 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,762 $ 2026 CALLE GUADALAJARA AVENIDA VAQUERO CALLE JUAREZ 460 40 18,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,005 $ 2026 CALLE GUADALAJARA CALLE JUAREZ CALLE HIDALGO 830 38 31,540 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 37,720 $ 2026 CALLE GUADALAJARA CALLE HIDALGO CALLE FRONTERA 422 38 16,036 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,178 $ 2026 CALLE GUADALAJARA CALLE FRONTERA CALLE GAUCHO 826 39 32,214 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 38,526 $ 2026 CALLE GUADALAJARA CALLE GAUCHO CALLE CORRAL 242 39 9,438 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,287 $ 2026 CALLE GUADALAJARA CALLE CORRAL CALLE REATA 475 39 18,525 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,155 $ 2026 CALLE GUADALAJARA CALLE REATA CALLE VALLARTA 710 39 27,690 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 33,116 $ 2026 VIA HIDALGO END CALLE HIDALGO 121 35 4,235 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 5,065 $ 2026 CALLE HIDALGO END CALLE GUADALAJARA 322 35 11,270 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,478 $ 2026 CALLE HIDALGO CALLE GUADALAJARA END 622 35 21,770 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 26,036 $ 2026 CALLE DESCANSO END CALLE AMIGO 461 35 16,135 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,297 $ 2026 CALLE AMIGO END CALLE FRONTERA 469 35 16,415 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,631 $ 2026 CALLE AMIGO CALLE FRONTERA CALLE DESCANSO 312 35 10,920 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,060 $ 2026 CALLE GAUCHO END CALLE FRONTERA 575 35 20,125 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 24,068 $ 2026 CALLE GAUCHO CALLE FRONTERA CALLE LUEGO 445 35 15,575 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,627 $ 2026 CALLE GAUCHO CALLE LUEGO CALLE CUADRA 593 35 20,755 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 24,822 $ 2026 CALLE GAUCHO CALLE CUADRA CALLE CHUECA 479 35 16,765 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 20,050 $ 2026 CALLE GAUCHO CALLE CHUECA CALLE GUADALAJARA 531 35 18,585 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,227 $ 2026 CALLE BARANDA END CALLE JUAREZ 663 35 23,205 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 27,752 $ 2026 CALLE JUAREZ END CALLE GUADALAJARA 504 39 19,656 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 23,507 $ 2026 CALLE JUAREZ CALLE GUADALAJARA VIA JUAREZ 494 37 18,278 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 21,859 $ 2026 CALLE JUAREZ VIA JUAREZ CALLE BARANDA 746 37 27,602 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 33,010 $ 2026 CALLE JUAREZ CALLE BARANDA CALLE FRONTERA 308 37 11,396 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,629 $ 2026 CALLE SORPRESO END CALLE FRONTERA 176 35 6,142 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,345 $ 2026 CALLE LUEGO CALLE FRONTERA CALLE MACHO 245 39 9,555 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,427 $ 2026 CALLE LUEGO CALLE MACHO CALLE GAUCHO 262 39 10,218 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,220 $ 2026 CALLE MACHO END CALLE LUEGO 478 35 16,730 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 20,008 $ 2026 CALLE BURRO END CALLE CUADRA 394 35 13,790 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 16,492 $ 2026 CALLE PAISANO END CALLE CUADRA 239 35 8,341 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,975 $ 2026 CALLE CUADRA CALLE FRONTERA CALLE BURRO 292 39 11,388 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,619 $ 2026 CALLE CUADRA CALLE BURRO CALLE PAISANO 680 39 26,520 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 31,716 $ 2026 CALLE CUADRA CALLE PAISANO CALLE GAUCHO 248 39 9,672 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,567 $ 2026 AVENIDA PRINCESA AVENIDA VALENCIA W OLA VISTA S 920 29 26,680 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 31,908 $ 2026 AVENIDA PRINCESA OLA VISTA S AVENIDA DEL PRESIDENTE 1,100 24 26,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 31,573 $ 2026 AVENIDA DE LOS LOBOS MARINOS W OLA VISTA S AVENIDA DEL PRESIDENTE 1,518 40 60,720 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 72,618 $ 2026 AVENIDA MATEO AVENIDA MONTEREY EL CAMINO REAL S 607 40 24,280 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 29,038 $ 2026 PASEO DE CRISTOBAL CALLE TOLEDO OLA VISTA S 953 39 37,167 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 44,450 $ 2026 3 of 12 441
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work PASEO DE CRISTOBAL OLA VISTA S EL CAMINO REAL S 1,092 39 42,588 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 50,933 $ 2026 VIA NADA END CALLE GRANDE VISTA 244 35 8,540 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,213 $ 2026 CALLE GRANDE VISTA END CALLE QUIETO 364 35 12,740 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 15,236 $ 2026 CALLE GRANDE VISTA CALLE QUIETO CALLE QUIETO 1,040 35 36,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 43,532 $ 2026 CALLE GRANDE VISTA CALLE QUIETO AVENIDA VAQUERO 2,900 35 101,500 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 121,388 $ 2026 AVENIDA MONTALVO AVENIDA LOBEIRO AVENIDA LOBEIRO 1,384 28 38,752 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 46,345 $ 2026 AVENIDA MONTALVO AVENIDA LOBEIRO AVENIDA CALAFIA 394 28 11,032 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,194 $ 2026 AVENIDA LOBEIRO AVENIDA MONTALVO AVENIDA MONTALVO 1,765 29 51,185 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 61,214 $ 2026 CANADA E EL CAMINO REAL N EL PORTAL E 735 40 29,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 35,161 $ 2026 VIA DELFIN AVENIDA SAN PABLO END 466 35 16,263 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,450 $ 2026 VIA LA JOLLA AVENIDA CORDOBA E END 450 33 14,850 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 17,760 $ 2026 VIA CATALINA END AVENIDA CORDOBA E 285 33 9,405 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,248 $ 2026 VISTA CAYENTA VISTA VALINDA AVENIDA BUENA SUERTE 923 39 35,997 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 43,050 $ 2026 AVENIDA ARLENA END LA ESPERANZA S 203 33 6,699 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,012 $ 2026 AVENIDA ARLENA LA ESPERANZA S AVENIDA CORDOBA E 1,185 33 39,105 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 46,767 $ 2026 CALLE ESMARCA LA ESPERANZA S END 177 35 6,177 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,387 $ 2026 CALLE ALTA END LA ESPERANZA S 84 35 2,932 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 3,507 $ 2026 VIA ROBINA CALLE PATRICIA END 324 33 10,692 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,787 $ 2026 CALLE PATRICIA LA ESPERANZA S VIA ROBINA 587 33 19,371 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 23,167 $ 2026 CALLE PATRICIA VIA ROBINA END 287 33 9,471 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,327 $ 2026 LA ESPERANZA S AVENIDA PRESIDIO VISTA ENCANTA 229 35 8,015 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,585 $ 2026 LA ESPERANZA S VISTA ENCANTA VISTA DEL PONTO 326 35 11,410 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,646 $ 2026 LA ESPERANZA S VISTA DEL PONTO CALLE PATRICIA 540 35 18,900 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,603 $ 2026 LA ESPERANZA S CALLE PATRICIA CALLE ESMARCA 1,185 35 41,475 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 49,602 $ 2026 LA ESPERANZA S CALLE ALTA AVENIDA ARLENA 664 35 23,240 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 27,794 $ 2026 LA ESPERANZA S AVENIDA ARLENA AVENIDA CORDOBA E 495 35 17,325 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 20,720 $ 2026 AVENIDA CORDOBA E AVENIDA ARLENA LA ESPERANZA S 1,350 32 43,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 51,665 $ 2026 VIA LA MESA END AVENIDA CORDOBA E 134 33 4,422 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 5,288 $ 2026 VISTA CANTORA VISTA VALINDA END 553 32 17,696 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 21,163 $ 2026 VISTA ALCEDO END VISTA VALINDA 274 31 8,494 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,158 $ 2026 VISTA VALINDA END VISTA CAYENTA 225 39 8,775 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,494 $ 2026 VISTA VALINDA VISTA CAYENTA VISTA CANTORA 195 36 7,020 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,396 $ 2026 VISTA VALINDA VISTA CANTORA VISTA ALCEDO 275 36 9,900 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,840 $ 2026 VISTA VALINDA VISTA ALCEDO AVENIDA SALVADOR 808 36 29,088 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 34,788 $ 2026 CALLE DULCINEA CALLE MONSERRAT END 650 33 21,450 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 25,653 $ 2026 CALLE MONSERRAT AVENIDA SALVADOR CALLE DULCINEA 312 33 10,296 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,313 $ 2026 CALLE MONSERRAT CALLE DULCINEA END 455 33 15,015 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 17,957 $ 2026 CALLE TIBIDABO AVENIDA SALVADOR END 195 35 6,806 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,140 $ 2026 CALLE MALAGUENA AVENIDA SALVADOR END 448 35 15,635 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,699 $ 2026 AVENIDA TERESA AVENIDA SALVADOR AVENIDA COLUMBO 857 33 28,281 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 33,823 $ 2026 AVENIDA TERESA AVENIDA COLUMBO END 483 33 15,939 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,062 $ 2026 CALLE NINA CALLE DE SOTO END 540 29 15,660 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,728 $ 2026 CALLE DE SOTO AVENIDA PRESIDIO CALLE NINA 262 33 8,646 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,340 $ 2026 CALLE DE SOTO CALLE NINA AVENIDA SALVADOR 1,300 33 42,900 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 51,306 $ 2026 LA ESPERANZA N END AVENIDA DE LA PAZ 257 35 8,995 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,758 $ 2026 PATERO DEL ORO AVENIDA LA CUESTA EL LEVANTE 1,665 21 34,965 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 41,816 $ 2026 AVENIDA PRESIDIO AVENIDA SALVADOR CALLE MIGUEL 864 39 33,696 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 40,299 $ 2026 AVENIDA PRESIDIO CALLE MIGUEL AVENIDA SAN CARLOS 296 39 11,544 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,806 $ 2026 AVENIDA PRESIDIO AVENIDA SAN CARLOS CALLE DE SOTO 626 39 24,414 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 29,198 $ 2026 AVENIDA PRESIDIO CALLE DE SOTO CALLE SONORA 139 39 5,421 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,483 $ 2026 AVENIDA PRESIDIO CALLE SONORA CALLE DE ANZA 295 39 11,505 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,759 $ 2026 AVENIDA PRESIDIO CALLE DE ANZA CALLE CORTEZ 300 39 11,700 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,993 $ 2026 CARRETERA CAMINO VERA CRUZ END 596 32 19,072 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,809 $ 2026 VIA JUAREZ END CALLE JUAREZ 128 37 4,736 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 5,664 $ 2026 4 of 12 442
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work CALLE MONTE CARLO END AVENIDA DE LA RIVIERA 495 30 14,850 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 17,760 $ 2026 AVENIDA CALAFIA OLA VISTA S AVENIDA DEL PRESIDENTE 370 39 14,430 CRACK SEAL AND SLURRY SEAL 9,472 $ 2027 CALLE VALLARTA CALLE CONTENTA CALLE DULCE 305 39 11,895 CRACK SEAL AND SLURRY SEAL 7,808 $ 2027 AVENIDA VALENCIA W OLA VISTA S AVENIDA DEL PRESIDENTE 852 40 34,080 CRACK SEAL AND SLURRY SEAL 22,371 $ 2027 PASEO DE CRISTOBAL VISTA MARINA LA RAMBLA 270 52 14,040 CRACK SEAL AND SLURRY SEAL 9,216 $ 2027 PASEO DE CRISTOBAL LA RAMBLA CALLE TOLEDO 517 40 20,680 CRACK SEAL AND SLURRY SEAL 13,575 $ 2027 CAZADOR LN PASADENA CT ELENA LN 445 28 12,460 CRACK SEAL AND SLURRY SEAL 8,179 $ 2027 CAZADOR LN ELENA LN OLA VISTA S 885 28 24,780 CRACK SEAL AND SLURRY SEAL 16,266 $ 2027 LA VENTANA END VIA BREVE 258 40 10,320 CRACK SEAL AND SLURRY SEAL 6,774 $ 2027 MONTEREY LN CORONADO LN ALAMEDA LN 125 25 3,125 CRACK SEAL AND SLURRY SEAL 2,051 $ 2027 MONTEREY LN ALAMEDA LN SANTA ANA LN 110 25 2,750 CRACK SEAL AND SLURRY SEAL 1,805 $ 2027 MONTEREY LN SANTA ANA LN CORONA LN 226 25 5,650 CRACK SEAL AND SLURRY SEAL 3,709 $ 2027 MONTEREY LN CORONA LN AVENIDA VICTORIA 613 25 15,325 CRACK SEAL AND SLURRY SEAL 10,060 $ 2027 OLA VISTA S AVENIDA MONTEREY AVENIDA MADRID 285 39 11,115 CRACK SEAL AND SLURRY SEAL 7,296 $ 2027 OLA VISTA S AVENIDA MADRID CAZADOR LN 66 39 2,574 CRACK SEAL AND SLURRY SEAL 1,690 $ 2027 OLA VISTA S CAZADOR LN TRAFALGAR LN 310 39 12,090 CRACK SEAL AND SLURRY SEAL 7,936 $ 2027 OLA VISTA S TRAFALGAR LN AVENIDA CADIZ W 133 39 5,187 CRACK SEAL AND SLURRY SEAL 3,405 $ 2027 OLA VISTA S AVENIDA GAVIOTA W AVENIDA VALENCIA W 302 39 11,778 CRACK SEAL AND SLURRY SEAL 7,731 $ 2027 OLA VISTA S AVENIDA PRINCESA AVENIDA DE LOS LOBOS MARINOS W 510 52 26,520 CRACK SEAL AND SLURRY SEAL 17,408 $ 2027 AVENIDA VICTORIA MONTEREY LN CAZADOR LN 451 40 18,040 CRACK SEAL AND SLURRY SEAL 11,842 $ 2027 AVENIDA MONTEREY AVENIDA MATEO AVENIDA ROSA 250 40 10,000 CRACK SEAL AND SLURRY SEAL 6,564 $ 2027 CORONA LN MONTEREY LN AVENIDA VICTORIA 321 25 8,025 CRACK SEAL AND SLURRY SEAL 5,268 $ 2027 AVENIDA CABRILLO EL CAMINO REAL N AVENIDA DE LA ESTRELLA 177 20 3,540 CRACK SEAL AND SLURRY SEAL 2,324 $ 2027 CALLE MIRADOR AVENIDA DEL REPOSO AVENIDA DE LA GRULLA 491 29 14,239 CRACK SEAL AND SLURRY SEAL 9,347 $ 2027 AVENIDA LA CUESTA SOLANO CALLE EMPALME 159 32 5,088 CRACK SEAL AND SLURRY SEAL 3,340 $ 2027 PUERTA DEL SOL AVENIDA VISTA HERMOSA CALLE ALICANTE 1,419 24 34,056 CRACK SEAL AND SLURRY SEAL 22,355 $ 2027 CALLE BATIDO CALLE ALICANTE END 239 24 5,736 CRACK SEAL AND SLURRY SEAL 3,765 $ 2027 CAMINO FARO CALLE FRONTERA CAMINO BUCANERO 690 32 22,080 CRACK SEAL AND SLURRY SEAL 14,494 $ 2027 AVENIDA DEL MAR CORONADO LN ALAMEDA LN 267 40 10,680 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 123,108 $ 2027 LA RAMBLA PASEO DE CRISTOBAL W BOCA DEL CANON 282 24 6,768 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 50,093 $ 2027 BOCA DE LA PLAYA CALLE LAS BOLAS EL CAMINO REAL N 232 40 9,280 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 68,686 $ 2027 AVENIDA SAN CARLOS CALLE SONORA AVENIDA PRESIDIO 306 33 10,098 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 74,740 $ 2027 CALLE REAL CALLE JUANITA CALLE ABRIL 300 40 12,000 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 14,997 $ 2027 CALLE REAL CALLE ABRIL CALLE MAYO 166 40 6,640 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,298 $ 2027 CALLE REAL CALLE MAYO VIA MANZANA 296 39 11,544 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 14,427 $ 2027 LOS BAUTISMOS LN AVENIDA MAGDALENA E END 659 25 16,475 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 20,590 $ 2027 AVENIDA CRESPI AVENIDA MAGDALENA E CALLE GOMEZ 1,434 25 35,850 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 44,804 $ 2027 VIA MONTEZUMA VIA MONTEGO VIA ALEGRE 984 40 39,360 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 49,191 $ 2027 VIA ARBOLEDA VIA MONTEGO VIA ALEGRE 1,009 31 31,279 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 39,091 $ 2027 AVENIDA SAN ANTONIO W END EL CAMINO REAL S 167 39 6,513 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,140 $ 2027 VIA CASA LOMA VIA MONTEGO VIA ALEGRE 1,056 31 32,736 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 40,912 $ 2027 VIA SANTO TOMAS VIA MONTEGO VIA ALEGRE 1,091 31 33,821 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 42,268 $ 2027 VIA VERBENA VIA MONTEGO VIA ALEGRE 1,067 31 33,077 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 41,338 $ 2027 VIA VISTOSA VIA MONTEGO VIA ALEGRE 1,004 31 31,124 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 38,898 $ 2027 VIA BANDITA VIA MONTEGO VIA ALEGRE 784 31 24,304 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 30,374 $ 2027 VIA LADO VIA MONTEGO VIA ALEGRE 563 31 17,453 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 21,812 $ 2027 VIA ALEGRE VIA MONTEGO VIA LADO 590 39 23,010 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 28,757 $ 2027 VIA ALEGRE VIA LADO VIA BANDITA 182 35 6,370 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,961 $ 2027 VIA ALEGRE VIA BANDITA VIA VISTOSA 172 35 6,020 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,524 $ 2027 VIA ALEGRE VIA VISTOSA VIA VERBENA 151 35 5,285 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,605 $ 2027 VIA ALEGRE VIA VERBENA VIA MONTECITO 163 35 5,705 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,130 $ 2027 VIA ALEGRE VIA MONTECITO VIA SANTO TOMAS 147 35 5,145 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,430 $ 2027 VIA ALEGRE VIA SANTO TOMAS VIA CASA LOMA 155 35 5,425 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,780 $ 2027 VIA ALEGRE VIA CASA LOMA VIA ARBOLEDA 152 35 5,320 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,649 $ 2027 5 of 12 443
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work VIA ALEGRE VIA ARBOLEDA VIA MONTEZUMA 143 35 5,005 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,255 $ 2027 VIA ALEGRE VIA MONTEZUMA END 231 35 8,085 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,104 $ 2027 VIA MONTECITO VIA MONTEGO VIA ALEGRE 1,080 31 33,480 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 41,842 $ 2027 CALLE VISTA TORITO AVENIDA VAQUERO VIA CORBINA 201 40 8,040 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,048 $ 2027 CALLE VISTA TORITO VIA CORBINA VIA SAN JACINTO 200 40 8,000 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,998 $ 2027 CALLE VISTA TORITO VIA SAN JACINTO VIA SAN GORGONIO 194 40 7,760 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,698 $ 2027 CALLE VISTA TORITO VIA SAN GORGONIO VIA MONTEZUMA 1,255 40 50,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 62,738 $ 2027 VIA MONTEGO VIA CASCADITA VIA ALEGRE 480 40 19,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 23,995 $ 2027 VIA MONTEGO VIA ALEGRE VIA LADO 275 40 11,000 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,747 $ 2027 VIA MONTEGO VIA LADO VIA BANDITA 215 40 8,600 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,748 $ 2027 VIA MONTEGO VIA BANDITA VIA VISTOSA 190 40 7,600 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,498 $ 2027 VIA MONTEGO VIA VISTOSA VIA VERBENA 175 40 7,000 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,748 $ 2027 VIA MONTEGO VIA VERBENA VIA MONTECITO 148 40 5,920 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,399 $ 2027 VIA MONTEGO VIA MONTECITO VIA SANTO TOMAS 157 40 6,280 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,849 $ 2027 VIA MONTEGO VIA SANTO TOMAS VIA CASA LOMA 155 40 6,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,749 $ 2027 VIA MONTEGO VIA CASA LOMA VIA ARBOLEDA 170 40 6,800 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,498 $ 2027 VIA MONTEGO VIA ARBOLEDA VIA MONTEZUMA 177 40 7,080 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,848 $ 2027 VIA CORBINA END CALLE VISTA TORITO 535 31 16,585 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 20,727 $ 2027 VIA SAN JACINTO VIA SAN GORGONIO CALLE VISTA TORITO 1,373 31 42,563 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 53,194 $ 2027 VIA SAN GORGONIO AVENIDA VAQUERO VIA SAN JACINTO 197 40 7,880 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,848 $ 2027 VIA SAN GORGONIO VIA SAN JACINTO CALLE VISTA TORITO 1,255 40 50,200 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 62,738 $ 2027 MARQUITA E EL CAMINO REAL N AVENIDA DE LA ESTRELLA 431 29 12,499 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 15,621 $ 2027 MARIPOSA E EL CAMINO REAL N AVENIDA DE LA ESTRELLA 592 40 23,680 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 29,594 $ 2027 ESCALONES E EL CAMINO REAL N AVENIDA DE LA ESTRELLA 760 39 29,640 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 37,043 $ 2027 CANADA E EL CAMINO REAL N EL PORTAL E 735 40 29,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 36,743 $ 2027 CALLE LA SERNA AVENIDA SAN PABLO END 695 33 22,935 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 28,663 $ 2027 AVENIDA SAN GABRIEL W END EL CAMINO REAL S 599 24 14,376 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 17,967 $ 2027 AVENIDA JUNIPERO W END EL CAMINO REAL S 549 29 15,921 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,897 $ 2027 AVENIDA CORNELIO W END EL CAMINO REAL S 520 29 15,080 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,846 $ 2027 CALLE REGLA END ENTRADA PARAISO 141 35 4,921 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,150 $ 2027 AVENIDA RAMONA E END EL CAMINO REAL S 478 39 18,642 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 23,298 $ 2027 AVENIDA DE LOS LOBOS MARINOS E CALLE ALCAZAR END 457 20 9,140 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,423 $ 2027 CALLE LETICIA END AVIENDA SAN JUAN E 272 35 9,493 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,864 $ 2027 CALLE MAYITA END AVENIDA SAN JUAN E 90 35 3,150 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 3,937 $ 2027 LA CIMA END AVIENDA SAN JUAN E 165 35 5,759 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,197 $ 2027 AVENIDA SAN JUAN E EL CAMINO REAL S CALLE ALCAZAR 178 29 5,162 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,451 $ 2027 AVENIDA SAN JUAN E CALLE ALCAZAR ENTRADA PARAISO 504 29 14,616 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,267 $ 2027 AVENIDA SAN JUAN E ENTRADA PARAISO CALLE MARIA 395 29 11,455 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 14,316 $ 2027 AVENIDA SAN JUAN E CALLE MARIA CALLE LETICIA 258 29 7,482 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,351 $ 2027 AVENIDA SAN JUAN E CALLE LETICIA CALLE MAYITA 317 29 9,193 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,489 $ 2027 AVENIDA SAN JUAN E CALLE MAYITA AVENIDA BUENA SUERTE 1,181 29 34,249 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 42,803 $ 2027 AVENIDA SAN JUAN E AVENIDA BUENA SUERTE LA CIMA 667 29 19,343 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 24,174 $ 2027 AVENIDA SAN JUAN E LA CIMA AVENIDA SALVADOR 204 29 5,916 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,394 $ 2027 AVENIDA VERDE CALLE ALCAZAR END 140 29 4,060 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 5,074 $ 2027 LADERA LN END AVENIDA CORDOBA E 247 35 8,620 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,773 $ 2027 VIA AVILA AVENIDA CORDOBA E END 185 33 6,105 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,630 $ 2027 AVENIDA CORDOBA E CALLE ALCAZAR LADERA LN 303 32 9,696 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,118 $ 2027 AVENIDA CORDOBA E LADERA LN VIA AVILA 232 32 7,424 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,278 $ 2027 AVENIDA CORDOBA E VIA AVILA VIA LA JOLLA 765 32 24,480 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 30,594 $ 2027 AVENIDA CORDOBA E VIA LA JOLLA VIA CATALINA 200 32 6,400 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,998 $ 2027 AVENIDA CORDOBA E VIA CATALINA VIA LA MESA 222 32 7,104 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,878 $ 2027 AVENIDA CORDOBA E VIA LA MESA LA ESPERANZA S 418 32 13,376 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 16,717 $ 2027 CALLE ALCAZAR END AVENIDA CORDOBA E 339 32 10,848 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,557 $ 2027 CALLE ALCAZAR AVENIDA CORDOBA E AVENIDA VERDE 628 32 19,296 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 24,115 $ 2027 6 of 12 444
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work CALLE ALCAZAR AVENIDA VERDE AVENIDA DE LOS LOBOS MARINOS E 305 32 9,600 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,998 $ 2027 CALLE ALCAZAR AVENIDA DE LOS LOBOS MARINOS E AVENIDA SAN JUAN E 298 32 9,536 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,918 $ 2027 CALLE MENDOZA END AVENIDA PRESIDIO 416 35 14,518 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,144 $ 2027 CALLE RICA END CALLE MIGUEL 185 35 6,457 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,070 $ 2027 CALLE RICA CALLE MIGUEL END 317 35 11,063 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,826 $ 2027 CALLE DORADO END CALLE MIGUEL 559 31 17,329 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 21,657 $ 2027 CALLE DORADO CALLE MIGUEL AVENIDA PRESIDIO 1,700 31 52,700 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 65,862 $ 2027 CALLE PESCADOR CALLE MIGUEL AVENIDA PRESIDIO 1,460 31 45,260 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 56,564 $ 2027 CALLE FELICIDAD END CALLE MIGUEL 256 31 7,936 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 9,918 $ 2027 CALLE FELICIDAD CALLE MIGUEL AVENIDA PRESIDIO 1,280 31 39,680 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 49,591 $ 2027 CALLE DELICADA END CALLE MIGUEL 310 31 9,610 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,010 $ 2027 CALLE DELICADA CALLE MIGUEL AVENIDA PRESIDIO 1,109 31 34,379 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 42,966 $ 2027 CALLE DELICADA AVENIDA PRESIDIO END 945 31 29,295 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 36,612 $ 2027 CALLE VILLARIO END CALLE MIGUEL 300 31 9,300 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 11,623 $ 2027 CALLE VILLARIO CALLE MIGUEL AVENIDA PRESIDIO 980 31 30,380 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 37,968 $ 2027 CALLE FAMILIA END CALLE MIGUEL 327 31 10,137 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,669 $ 2027 CALLE FAMILIA CALLE MIGUEL AVENIDA PRESIDIO 905 31 28,055 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 35,062 $ 2027 CALLE FAMILIA AVENIDA PRESIDIO CALLE EMPALME 895 31 27,745 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 34,675 $ 2027 CALLE ROBLES AVENIDA PRESIDIO CALLE EMPALME 969 31 30,039 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 37,542 $ 2027 CALLE PUEBLO END CALLE MIGUEL 422 31 13,082 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 16,349 $ 2027 CALLE PUEBLO CALLE MIGUEL AVENIDA PRESIDIO 886 31 27,466 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 34,326 $ 2027 CALLE PUEBLO AVENIDA PRESIDIO CALLE EMPALME 941 31 29,171 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 36,457 $ 2027 CALLE NEBLINA END CALLE MIGUEL 521 31 16,151 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 20,185 $ 2027 CALLE NEBLINA CALLE MIGUEL AVENIDA PRESIDIO 842 31 26,102 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 32,621 $ 2027 CALLE NEBLINA AVENIDA PRESIDIO CALLE EMPALME 806 31 24,986 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 31,227 $ 2027 CALLE FIESTA END CALLE MIGUEL 540 31 16,740 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 20,921 $ 2027 CALLE FIESTA CALLE MIGUEL AVENIDA PRESIDIO 840 31 26,040 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 32,544 $ 2027 CALLE FIESTA AVENIDA PRESIDIO CALLE EMPALME 600 31 18,600 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 23,246 $ 2027 CALLE EMPALME CALLE MIGUEL AVENIDA PRESIDIO 857 31 26,567 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 33,202 $ 2027 CALLE EMPALME AVENIDA PRESIDIO CALLE FIESTA 570 31 17,670 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 22,083 $ 2027 CALLE EMPALME CALLE FIESTA CALLE NEBLINA 271 31 8,401 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,499 $ 2027 CALLE EMPALME CALLE NEBLINA CALLE PUEBLO 229 31 7,099 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,872 $ 2027 CALLE EMPALME CALLE PUEBLO CALLE ROBLES 177 31 5,487 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 6,857 $ 2027 CALLE SALIDA END CALLE ESCUELA 456 35 15,914 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,889 $ 2027 CALLE SANDIA END CALLE ESCUELA 455 35 15,880 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 19,846 $ 2027 CALLE DEL JUEGO END CALLE ESCUELA 334 35 11,657 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 14,568 $ 2027 CALLE ESCUELA CALLE MIGUEL CALLE SALIDA 189 31 5,859 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,322 $ 2027 CALLE ESCUELA CALLE SALIDA CALLE DEL JUEGO 321 31 9,951 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 12,436 $ 2027 CALLE ESCUELA CALLE DEL JUEGO CALLE SANDIA 489 31 15,159 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,945 $ 2027 CALLE ESCUELA CALLE SANDIA AVENIDA PRESIDIO 681 31 21,111 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 26,384 $ 2027 CALLE MARIA END AVENIDA SAN JUAN E 75 35 2,625 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 3,281 $ 2027 CORTE CRISTIANITOS AVENIDA TRINIDAD CAMINO LA PEDRIZA 360 24 8,640 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 10,798 $ 2027 CALLE TINAJA END VIA CASCADITA 440 33 14,520 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 18,147 $ 2027 VIA SENDA END VIA CASCADITA 326 33 10,758 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,445 $ 2027 VIA CASCADITA AVENIDA VAQUERO VIA MONTEGO 261 40 10,440 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 13,048 $ 2027 VIA CASCADITA VIA MONTEGO VIA SENDA 929 40 37,160 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 46,441 $ 2027 VIA CASCADITA VIA SENDA CALLE TINAJA 158 40 6,320 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 7,898 $ 2027 VIA CASCADITA CALLE TINAJA VIA BALLENA 167 40 6,680 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,348 $ 2027 VIA CASCADITA VIA BALLENA VIA SAN ANDREAS 170 40 6,800 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 8,498 $ 2027 VIA CASCADITA VIA SAN ANDREAS VIA SOCORRO 107 40 4,280 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 5,349 $ 2027 VIA SAN ANDREAS VIA CASCADITA VIA BALLENA 1,970 33 65,010 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 81,247 $ 2027 VIA BALLENA VIA CASCADITA VIA SOCORRO 2,295 33 75,735 07CSC TYPE (I) SLURRY SEAL 3% PMCQS 94,651 $ 2027 CALLE HERALDO OTERO CAMPO RASO 658 40 26,320 CRACK SEAL AND SLURRY SEAL 18,055 $ 2028 CALLE HERALDO PENASCO CALLE DONCELLA 1,105 40 44,200 CRACK SEAL AND SLURRY SEAL 30,320 $ 2028 7 of 12 445
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work CALLE HERALDO CALLE DONCELLA VIA BLANCO 204 40 8,160 CRACK SEAL AND SLURRY SEAL 5,597 $ 2028 CALLE VALLARTA CALLE DULCE CALLE EMBOCADURA 693 39 27,027 CRACK SEAL AND SLURRY SEAL 18,540 $ 2028 CALLE VALLARTA CALLE GUADALAJARA CALLE CUMBRE 308 39 12,012 CRACK SEAL AND SLURRY SEAL 8,240 $ 2028 AVENIDA DEL PRESIDENTE AVENIDA DE LOS LOBOS MARINOS W AVENIDA SAN ANTONIO W 282 40 11,280 CRACK SEAL AND SLURRY SEAL 7,738 $ 2028 AVENIDA DEL PRESIDENTE AVENIDA DE LAS PALMERAS CITY LIMIT 745 48 35,760 CRACK SEAL AND SLURRY SEAL 24,530 $ 2028 CALLE TOLEDO PASEO DE CRISTOBAL W AVENIDA CORDOBA W 480 64 30,720 CRACK SEAL AND SLURRY SEAL 21,073 $ 2028 ESPLANADE VISTA MARINA CALLE CONCHITA 185 64 11,840 CRACK SEAL AND SLURRY SEAL 8,122 $ 2028 ESPLANADE CALLE CONCHITA TRAFALGAR LN 275 64 17,600 CRACK SEAL AND SLURRY SEAL 12,073 $ 2028 ESPLANADE TRAFALGAR LN AVENIDA BARCELONA 176 64 11,264 CRACK SEAL AND SLURRY SEAL 7,727 $ 2028 OLA VISTA S AVENIDA CADIZ W AVENIDA BARCELONA 262 39 10,218 CRACK SEAL AND SLURRY SEAL 7,009 $ 2028 OLA VISTA S AVENIDA BARCELONA ESPLANADE 304 39 11,856 CRACK SEAL AND SLURRY SEAL 8,133 $ 2028 OLA VISTA S AVENIDA DE LOS LOBOS MARINOS W AVENIDA SAN ANTONIO W 515 52 26,780 CRACK SEAL AND SLURRY SEAL 18,370 $ 2028 OLA VISTA S AVENIDA DE LA RIVIERA CALLE DEL PACIFICO 416 30 12,480 CRACK SEAL AND SLURRY SEAL 8,561 $ 2028 OLA VISTA S AVENIDA MAGDALENA W AVENIDA CALAFIA 355 30 10,650 CRACK SEAL AND SLURRY SEAL 7,306 $ 2028 AVENIDA SANTA BARBARA CALLE SEVILLE S OLA VISTA S 553 39 21,567 CRACK SEAL AND SLURRY SEAL 14,794 $ 2028 AVENIDA PALIZADA W LOMA LN EL CAMINO REAL N 309 40 12,360 CRACK SEAL AND SLURRY SEAL 8,479 $ 2028 AVENIDA SAN PABLO AVENIDA SAN GABRIEL E EL CAMINO REAL S 736 29 21,050 CRACK SEAL AND SLURRY SEAL 14,440 $ 2028 ENTRADA PARAISO AVENIDA RAMONA E CALLE REGLA 400 33 13,200 CRACK SEAL AND SLURRY SEAL 9,055 $ 2028 AVENIDA VERDE CALLE ALCAZAR END 210 29 6,090 CRACK SEAL AND SLURRY SEAL 4,178 $ 2028 CALLE PASTADERO END CALLE AGUILA 435 40 17,400 CRACK SEAL AND SLURRY SEAL 11,936 $ 2028 LA ESPERANZA N AVENIDA DE LA PAZ AVENIDA PIZARRO 314 35 10,990 CRACK SEAL AND SLURRY SEAL 7,539 $ 2028 CALLE ALTEA VIA SEDONA CAMINO MIRA MONTE 517 36 18,612 CRACK SEAL AND SLURRY SEAL 12,767 $ 2028 CALLE SARMENTOSO RIACHUELO VIA TULIPAN 3,138 32 100,416 CRACK SEAL AND SLURRY SEAL 68,882 $ 2028 CALLE SARMENTOSO VIA TULIPAN CAMINO DEL RIO 574 32 18,368 CRACK SEAL AND SLURRY SEAL 12,600 $ 2028 CALLE ALICANTE CALLE BATIDO AVENIDA PICO 314 24 7,536 CRACK SEAL AND SLURRY SEAL 5,169 $ 2028 CALLE CAMPANERO PASEO LUNA VIA SUERTE 529 41 21,689 CRACK SEAL AND SLURRY SEAL 14,878 $ 2028 CALLE CAMPANERO VIA SUERTE AVENIDA TALEGA 339 41 13,899 CRACK SEAL AND SLURRY SEAL 9,534 $ 2028 CALLE IGLESIA CALLE DEL CERRO CALLE PINTORESCO 249 55 13,695 CRACK SEAL AND SLURRY SEAL 9,394 $ 2028 CALLE IGLESIA AVENIDA FABRICANTE AVENIDA LA PATA 400 41 16,400 CRACK SEAL AND SLURRY SEAL 11,250 $ 2028 CAMINO FARO CAMINO BUCANERO AVENIDA VISTA HERMOSA 930 32 29,760 CRACK SEAL AND SLURRY SEAL 20,414 $ 2028 CALLE PORTOFINO AVENIDA TALEGA END 580 40 23,200 CRACK SEAL AND SLURRY SEAL 15,914 $ 2028 CALLE MONTEREY CITY LIMIT CALLE ABRIL 163 40 6,520 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 78,538 $ 2028 AVENIDA MENDOCINO AVENIDA DEL PRESIDENTE EL CAMINO REAL S 333 35 11,622 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 139,994 $ 2028 AVENIDA SAN ANTONIO W END EL CAMINO REAL S 167 39 6,513 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 78,453 $ 2028 AVENIDA VALENCIA W AVENIDA DEL PRESIDENTE EL CAMINO REAL S 247 52 12,844 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 154,714 $ 2028 AVENIDA ESTACION CALLE DESHECHA END 723 63 45,549 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 548,667 $ 2028 PASADENA CT END CAZADOR LN 210 35 7,329 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 88,283 $ 2028 PASADENA CT CAZADOR LN AVENIDA VICTORIA 192 35 6,701 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 80,718 $ 2028 AVENIDA SANTA BARBARA AVENIDA DEL MAR CALLE SEVILLE S 851 39 33,189 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 399,783 $ 2028 AVENIDA DEL MAR ALAMEDA LN ACEBO LN 109 39 4,251 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 51,206 $ 2028 AVENIDA DEL MAR ACEBO LN AVENIDA GRANADA 288 40 12,200 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 146,957 $ 2028 AVENIDA DEL MAR AVENIDA GRANADA CALLE SEVILLE N 520 40 20,800 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 250,549 $ 2028 AVENIDA CABRILLO Y INTERSECTION AVENIDA PALIZADA W 175 24 4,200 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 50,592 $ 2028 AVENIDA RAMONA E ENTRADA PARAISO END 710 29 20,590 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 248,020 $ 2028 CALLE ALCAZAR AVENIDA DE LOS LOBOS MARINOS E AVENIDA SAN JUAN E 298 32 9,536 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 114,867 $ 2028 AVENIDA SALVADOR CALLE TIBIDABO CALLE MONSERRAT 216 39 8,424 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 101,472 $ 2028 CALLE VICENTE END AVENIDA VAQUERO 1,261 32 40,352 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 312,105 $ 2028 CALLE LAS PALMAS AVENIDA LA COSTA AVENIDA DE LA RIVIERA 428 35 14,980 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 115,864 $ 2028 AVENIDA DE LA RIVIERA CALLE MAJORCA OLA VISTA S 297 49 14,553 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 112,561 $ 2028 AVENIDA DE LOS LOBOS MARINOS W CALLE LASUEN CALLE ROCA VISTA 215 40 8,600 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 66,517 $ 2028 OLA VISTA S PASEO DE LA SERENATA AVENIDA DE LA RIVIERA 332 20 6,640 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 51,358 $ 2028 MARQUITA E EL CAMINO REAL N AVENIDA DE LA ESTRELLA 431 29 12,499 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 96,674 $ 2028 AVENIDA JUNIPERO W END EL CAMINO REAL S 549 29 15,921 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 123,142 $ 2028 LADERA LN END AVENIDA CORDOBA E 247 35 8,620 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 66,672 $ 2028 8 of 12 446
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work AVENIDA CORDOBA E VIA LA MESA LA ESPERANZA S 418 32 13,376 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 103,458 $ 2028 AVENIDA PRESIDIO CALLE EMPALME CALLE FIESTA 191 39 7,449 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 57,615 $ 2028 AVENIDA PRESIDIO CALLE PUEBLO CALLE FAMILIA 237 39 9,243 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 71,491 $ 2028 CALLE FAMILIA END CALLE MIGUEL 327 31 10,137 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 78,405 $ 2028 CALLE PUEBLO END CALLE MIGUEL 422 31 13,082 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 101,184 $ 2028 CALLE SALIDA END CALLE ESCUELA 456 35 15,914 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 123,088 $ 2028 CALLE DEL CERRO LORCA CAMINO IBIZA 1,010 36 36,360 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 281,229 $ 2028 LA PALOMA MARIPOSA W CALLE PUENTE 960 40 38,400 CRACK SEAL AND SLURRY SEAL 27,527 $ 2029 PASEO DE LA SERENATA END OLA VISTA S 588 32 18,816 CRACK SEAL AND SLURRY SEAL 13,488 $ 2029 AVENIDA DEL PONIENTE AVENIDA DEL PONIENTE CALLE PUENTE 223 40 8,920 CRACK SEAL AND SLURRY SEAL 6,394 $ 2029 AVENIDA DEL PONIENTE CALLE PUENTE EL PRADO 422 33 13,926 CRACK SEAL AND SLURRY SEAL 9,983 $ 2029 CAMINO DE LOS MARES (FRONTAGE) AVENIDA VAQUERO CALLE NUEVO 3,170 31 98,270 CRACK SEAL AND SLURRY SEAL 70,443 $ 2029 CALLE DE LOS ALAMOS CALLE LASUEN AVENIDA DE LOS LOBOS MARINOS W 743 40 29,720 CRACK SEAL AND SLURRY SEAL 21,304 $ 2029 AVENIDA DE LOS LOBOS MARINOS W CALLE DE LOS ALAMOS CALLE LASUEN 867 40 34,680 CRACK SEAL AND SLURRY SEAL 24,860 $ 2029 CALLE ROCA VISTA CALLE DE LOS ALAMOS CALLE PRIMAVERA 287 32 9,184 CRACK SEAL AND SLURRY SEAL 6,583 $ 2029 CALLE TOLEDO AVENIDA CORDOBA W AVENIDA GAVIOTA W 225 64 14,400 CRACK SEAL AND SLURRY SEAL 10,322 $ 2029 OLA VISTA S AVENIDA DEL MAR AVENIDA GRANADA 277 39 10,803 CRACK SEAL AND SLURRY SEAL 7,744 $ 2029 OLA VISTA S AVENIDA VICTORIA AVENIDA ROSA 250 25 6,250 CRACK SEAL AND SLURRY SEAL 4,480 $ 2029 OLA VISTA S AVENIDA ROSA AVENIDA SANTA BARBARA 224 25 5,600 CRACK SEAL AND SLURRY SEAL 4,014 $ 2029 OLA VISTA S AVENIDA CORDOBA W AVENIDA GAVIOTA W 327 39 12,753 CRACK SEAL AND SLURRY SEAL 9,142 $ 2029 OLA VISTA S AVENIDA SAN ANTONIO W AVENIDA ALESSANDRO W 210 25 5,250 CRACK SEAL AND SLURRY SEAL 3,763 $ 2029 OLA VISTA S AVENIDA ALESSANDRO W AVENIDA RAMONA W 274 25 6,475 CRACK SEAL AND SLURRY SEAL 4,642 $ 2029 OLA VISTA S AVENIDA RAMONA W AVENIDA CORNELIO W 219 25 5,475 CRACK SEAL AND SLURRY SEAL 3,925 $ 2029 OLA VISTA S AVENIDA CORNELIO W AVENIDA JUNIPERO W 250 25 6,250 CRACK SEAL AND SLURRY SEAL 4,480 $ 2029 OLA VISTA S CALLE DEL PACIFICO AVENIDA MAGDALENA W 356 30 10,680 CRACK SEAL AND SLURRY SEAL 7,656 $ 2029 CALLE QUIETO CAMINO ALONDRA CALLE GRANDE VISTA 543 35 19,005 CRACK SEAL AND SLURRY SEAL 13,623 $ 2029 AVENIDA MONTEREY AVENIDA VICTORIA OLA VISTA S 552 40 22,080 CRACK SEAL AND SLURRY SEAL 15,828 $ 2029 AVENIDA MONTEREY AVENIDA ALGODON AVENIDA MATEO 141 40 5,640 CRACK SEAL AND SLURRY SEAL 4,043 $ 2029 OLA VISTA N AVENIDA PALIZADA W AVENIDA MIRAMAR 250 39 9,750 CRACK SEAL AND SLURRY SEAL 6,989 $ 2029 OLA VISTA N AVENIDA MIRAMAR AVENIDA SERRA 266 39 10,374 CRACK SEAL AND SLURRY SEAL 7,436 $ 2029 OLA VISTA N AVENIDA SERRA AVENIDA CABRILLO 256 39 9,984 CRACK SEAL AND SLURRY SEAL 7,157 $ 2029 CALLE BORREGO END CAMINO MIRA COSTA 430 39 16,770 CRACK SEAL AND SLURRY SEAL 12,021 $ 2029 ENCINO LN LINDA LN AVENIDA PALIZADA W 469 29 13,601 CRACK SEAL AND SLURRY SEAL 9,750 $ 2029 VIA MECHA LINDA LN MARQUITA W 414 23 9,522 CRACK SEAL AND SLURRY SEAL 6,826 $ 2029 LINDA LN ENCINO LN VIA MECHA 521 23 11,983 CRACK SEAL AND SLURRY SEAL 8,590 $ 2029 AVENIDA PALIZADA W LOMA LN OLA VISTA N 449 40 17,960 CRACK SEAL AND SLURRY SEAL 12,874 $ 2029 ESCALONES W CANADA W CALLE PUENTE 675 39 26,325 CRACK SEAL AND SLURRY SEAL 18,871 $ 2029 ESCALONES W CALLE PUENTE EL CAMINO REAL N 1,424 39 55,536 CRACK SEAL AND SLURRY SEAL 39,810 $ 2029 LA RONDA CHIQUITA EL PORTAL E 368 29 6,322 CRACK SEAL AND SLURRY SEAL 4,532 $ 2029 LA RONDA CHIQUITA CHIQUITA 472 29 13,688 CRACK SEAL AND SLURRY SEAL 9,812 $ 2029 AVENIDA DE LA ESTRELLA EL PORTAL E ESCALONES E 70 40 2,800 CRACK SEAL AND SLURRY SEAL 2,007 $ 2029 AVENIDA DE LA ESTRELLA MARIPOSA E MARQUITA E 255 40 10,200 CRACK SEAL AND SLURRY SEAL 7,312 $ 2029 AVENIDA TRIESTE AVENIDA JUNIPERO E END 377 30 11,310 CRACK SEAL AND SLURRY SEAL 8,107 $ 2029 AVENIDA SAN GABRIEL E EL CAMINO REAL S AVENIDA SAN PABLO 675 39 26,325 CRACK SEAL AND SLURRY SEAL 18,871 $ 2029 CALLE SACRAMENTO CALLE COLINA AVENIDA FLORENCIA 732 40 29,280 CRACK SEAL AND SLURRY SEAL 20,989 $ 2029 AVENIDA CORNELIO E EL CAMINO REAL S END 702 29 20,358 CRACK SEAL AND SLURRY SEAL 14,593 $ 2029 AVENIDA JUNIPERO E EL CAMINO REAL S AVENIDA TRIESTE 622 29 18,038 CRACK SEAL AND SLURRY SEAL 12,930 $ 2029 AVENIDA JUNIPERO E AVENIDA TRIESTE ENTRADA PARAISO 493 29 14,297 CRACK SEAL AND SLURRY SEAL 10,249 $ 2029 LOS OBREROS LN CALLE DE LOS MOLINOS CALLE VALLE 1,108 35 38,669 CRACK SEAL AND SLURRY SEAL 27,719 $ 2029 CALLE PASTADERO CALLE AGUILA AVENIDA VISTA MONTANA 2,509 40 100,360 CRACK SEAL AND SLURRY SEAL 71,942 $ 2029 AVENIDA SAN CARLOS EL LEVANTE CALLE CORTEZ 269 33 8,877 CRACK SEAL AND SLURRY SEAL 6,363 $ 2029 CALLE DEL CERRO AVENIDA VISTA MONTANA AVENIDA LA PATA 1,994 36 71,784 CRACK SEAL AND SLURRY SEAL 51,457 $ 2029 CALLE CAMPANA CALLE CANASTA CAMINO DE LOS MARES 202 51 10,302 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 129,678 $ 2029 AVENIDA FLORENCIA AVENIDA HACIENDA CALLE LAS BOLAS 233 40 9,320 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 117,317 $ 2029 9 of 12 447
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work DEL GADO RD CAMINO CAPISTRANO CITY LIMIT 994 35 34,790 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 437,926 $ 2029 AVENIDA DEL MAR CALLE SEVILLE N OLA VISTA N 1,180 59 69,620 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 876,355 $ 2029 AVENIDA CORNELIO W END EL CAMINO REAL S 520 29 15,080 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 189,822 $ 2029 AVENIDA SALVADOR VISTA VALINDA AVENIDA SAN JUAN E 1,982 39 77,298 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 973,004 $ 2029 CALLE TOLEDO ESPLANADE PASEO DE CRISTOBAL W 235 64 15,040 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 121,563 $ 2029 PASEO DE CRISTOBAL END ESPLANADE 358 52 18,616 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 150,466 $ 2029 OLA VISTA S AVENIDA JUNIPERO W PASEO DE LA SERENATA 372 30 11,160 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 90,202 $ 2029 ELENA LN AVENIDA VICTORIA CAZADOR LN 447 29 12,963 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 104,775 $ 2029 AVENIDA DE LA ESTRELLA CALLE REDONDEL LA PLACENTIA 1,042 40 41,680 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 336,884 $ 2029 CALLE BALBOA END CALLE CORTEZ 515 33 16,995 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 137,364 $ 2029 CALLE FAMILIA CALLE MIGUEL AVENIDA PRESIDIO 905 31 28,055 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 226,758 $ 2029 VIA SACRAMENTO CALLE ABRIL CALLE MAYO 166 40 6,640 CRACK SEAL AND SLURRY SEAL 4,974 $ 2030 VIA MANZANA CITY LIMIT CALLE BIENVENIDO 340 31 10,540 CRACK SEAL AND SLURRY SEAL 7,895 $ 2030 AVENIDA COTA AVENIDA SANTA MARGARITA AVENIDA COSTANSO 267 31 8,277 CRACK SEAL AND SLURRY SEAL 6,200 $ 2030 AVENIDA COTA BEND END 322 21 17,346 CRACK SEAL AND SLURRY SEAL 12,994 $ 2030 AVENIDA COSTANSO END AVENIDA COTA 963 21 20,223 CRACK SEAL AND SLURRY SEAL 15,149 $ 2030 CALLE AGUA CALLE VERANO GATE 800 36 28,800 CRACK SEAL AND SLURRY SEAL 21,574 $ 2030 AVENIDA MAGDALENA E AVENIDA ORTEGA AVENIDA SANTA MARGARITA 225 40 9,000 CRACK SEAL AND SLURRY SEAL 6,742 $ 2030 AVENIDA SAN DIEGO EL CAMINO REAL S AVENIDA SANTA MARGARITA 915 34 31,110 CRACK SEAL AND SLURRY SEAL 23,304 $ 2030 AVENIDA SANTA MARGARITA AVENIDA DOLORES AVENIDA SAN LUIS REY 177 24 4,248 CRACK SEAL AND SLURRY SEAL 3,182 $ 2030 INCLINADO END ALTURA 450 40 18,000 CRACK SEAL AND SLURRY SEAL 13,484 $ 2030 CADENA END ESTAMPIDA 448 40 17,920 CRACK SEAL AND SLURRY SEAL 13,424 $ 2030 PORTICO DEL NORTE ESTAMPIDA EMINENCIA DEL SUR 980 39 38,220 CRACK SEAL AND SLURRY SEAL 28,630 $ 2030 PORTICO DEL NORTE EMINENCIA DEL NORTE CAMINO DE LOS MARES 1,387 39 54,093 CRACK SEAL AND SLURRY SEAL 40,521 $ 2030 ESTAMPIDA CADENA PORTICO DEL NORTE 615 40 24,600 CRACK SEAL AND SLURRY SEAL 18,428 $ 2030 BONANZA REBANO ALFORJA 535 40 21,400 CRACK SEAL AND SLURRY SEAL 16,031 $ 2030 CERCA END RIACHUELO 382 40 15,280 CRACK SEAL AND SLURRY SEAL 11,446 $ 2030 RIACHUELO RIACHUELO RIACHUELO 1,080 40 43,200 CRACK SEAL AND SLURRY SEAL 32,361 $ 2030 RIACHUELO RIACHUELO LLANO 345 40 13,800 CRACK SEAL AND SLURRY SEAL 10,337 $ 2030 RIACHUELO LLANO RIACHUELO 275 40 11,000 CRACK SEAL AND SLURRY SEAL 8,240 $ 2030 RIACHUELO RIACHUELO RIACHUELO 350 40 14,000 CRACK SEAL AND SLURRY SEAL 10,487 $ 2030 VIA BLANCO CALLE VALLARTA PENASCO 1,012 40 40,480 CRACK SEAL AND SLURRY SEAL 30,323 $ 2030 CALLE HERALDO CAMINO VERA CRUZ ARROYO 465 40 18,600 CRACK SEAL AND SLURRY SEAL 13,933 $ 2030 CALLE HERALDO ARROYO PANADERO 445 40 17,800 CRACK SEAL AND SLURRY SEAL 13,334 $ 2030 CALLE HERALDO CAMINANTE OTERO 77 40 3,080 CRACK SEAL AND SLURRY SEAL 2,307 $ 2030 CALLE HERALDO CAMPO RASO NOVILUNIO 200 40 8,000 CRACK SEAL AND SLURRY SEAL 5,993 $ 2030 CALLE HERALDO NOVILUNIO PENASCO 450 40 18,000 CRACK SEAL AND SLURRY SEAL 13,484 $ 2030 CALLE VALLARTA CALLE AMABLE CALLE BRISA 300 39 11,700 CRACK SEAL AND SLURRY SEAL 8,764 $ 2030 CALLE VALLARTA CALLE FRONTERA CALLE GUADALAJARA 371 39 14,469 CRACK SEAL AND SLURRY SEAL 10,839 $ 2030 AVENIDA ARAGON BUENA VISTA CALLE PUENTE 1,126 39 43,914 CRACK SEAL AND SLURRY SEAL 32,896 $ 2030 AVENIDA FLORENCIA CALLE LAS BOLAS CALLE MIRADOR 352 40 14,080 CRACK SEAL AND SLURRY SEAL 10,547 $ 2030 AVENIDA FLORENCIA CALLE MIRADOR EL CAMINO REAL N 171 40 6,840 CRACK SEAL AND SLURRY SEAL 5,124 $ 2030 AVENIDA DEL PRESIDENTE AVENIDA SAN LUIS REY AVENIDA VISTA DEL OCEANO 2,305 48 110,640 CRACK SEAL AND SLURRY SEAL 82,880 $ 2030 CALLE TOLEDO AVENIDA GAVIOTA W AVENIDA VALENCIA W 351 64 22,464 CRACK SEAL AND SLURRY SEAL 16,828 $ 2030 AVENIDA SANTIAGO W OLA VISTA S EL CAMINO REAL S 1,231 29 35,699 CRACK SEAL AND SLURRY SEAL 26,742 $ 2030 LA RAMBLA BOCA DEL CANON END 258 24 6,192 CRACK SEAL AND SLURRY SEAL 4,638 $ 2030 AVENIDA BARCELONA ESPLANADE OLA VISTA S 925 39 36,075 CRACK SEAL AND SLURRY SEAL 27,024 $ 2030 ESPLANADE CALLE TOLEDO OLA VISTA S 775 40 31,000 CRACK SEAL AND SLURRY SEAL 23,222 $ 2030 ESPLANADE OLA VISTA S EL CAMINO REAL S 1,389 40 55,560 CRACK SEAL AND SLURRY SEAL 41,620 $ 2030 PASEO DE CRISTOBAL ESPLANADE VISTA MARINA 672 52 34,944 CRACK SEAL AND SLURRY SEAL 26,176 $ 2030 OLA VISTA S PASEO DE CRISTOBAL W AVENIDA CORDOBA W 328 39 12,792 CRACK SEAL AND SLURRY SEAL 9,582 $ 2030 OLA VISTA S AVENIDA GAVIOTA W AVENIDA GAVIOTA W 218 39 8,502 CRACK SEAL AND SLURRY SEAL 6,369 $ 2030 OLA VISTA S AVENIDA PRINCESA AVENIDA PRINCESA 145 52 7,540 CRACK SEAL AND SLURRY SEAL 5,648 $ 2030 AVENIDA MONTEREY OLA VISTA S AVENIDA MADRID 332 36 16,412 CRACK SEAL AND SLURRY SEAL 12,294 $ 2030 10 of 12 448
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work CALLE DESHECHA BOCA DE LA PLAYA AVENIDA PICO 323 26 8,398 CRACK SEAL AND SLURRY SEAL 6,291 $ 2030 ENCINO LN AVENIDA PALIZADA W LINDA LN 345 29 10,005 CRACK SEAL AND SLURRY SEAL 7,495 $ 2030 CALLE GUAYMAS CALLE LA VETA CAMINO MIRA COSTA 622 39 24,258 CRACK SEAL AND SLURRY SEAL 18,172 $ 2030 ARENOSO LN END AVENIDA PALIZADA W 450 29 13,050 CRACK SEAL AND SLURRY SEAL 9,776 $ 2030 CHIQUITA LA RONDA LA RONDA 347 29 10,063 CRACK SEAL AND SLURRY SEAL 7,538 $ 2030 EL PORTAL W EL CAMINO REAL N EL PORTAL TRIANGLE W 168 39 5,616 CRACK SEAL AND SLURRY SEAL 4,207 $ 2030 AVENIDA ACAPULCO VIA FLORIDA VIA PROMONTORIO 67 40 2,680 CRACK SEAL AND SLURRY SEAL 2,008 $ 2030 ENTRADA PARAISO AVENIDA SAN JUAN E CERRITO CIELO 155 33 5,115 CRACK SEAL AND SLURRY SEAL 3,832 $ 2030 ENTRADA PARAISO CERRITO CIELO AVENIDA RAMONA E 340 33 11,220 CRACK SEAL AND SLURRY SEAL 8,405 $ 2030 AVENIDA SALVADOR AVENIDA COLUMBO CALLE MALAGUENA 1,121 39 43,719 CRACK SEAL AND SLURRY SEAL 32,750 $ 2030 CALLE ALTEA CAMINO MIRA MONTE CALLE VIENTO 474 36 17,064 CRACK SEAL AND SLURRY SEAL 12,783 $ 2030 AVENIDA VISTA MONTANA CALLE PASTADERO CALLE DEL CERRO 3,267 44 143,748 CRACK SEAL AND SLURRY SEAL 107,681 $ 2030 CALLE FRONTERA CALLE VALLARTA CALLE EMBOCADURA 625 40 25,000 CRACK SEAL AND SLURRY SEAL 18,727 $ 2030 CALLE FRONTERA CALLE EMBOCADURA CALLE FIERROS 229 40 9,160 CRACK SEAL AND SLURRY SEAL 6,862 $ 2030 CALLE FRONTERA CALLE FIERROS CALLE GANADERO 232 40 9,280 CRACK SEAL AND SLURRY SEAL 6,952 $ 2030 CALLE FRONTERA CALLE GANADERO CALLE GUADALAJARA 473 40 18,920 CRACK SEAL AND SLURRY SEAL 14,173 $ 2030 CALLE FRONTERA CALLE GUADALAJARA CALLE AMIGO 645 39 25,155 CRACK SEAL AND SLURRY SEAL 18,843 $ 2030 CALLE FRONTERA CALLE GAUCHO CALLE JUAREZ 401 39 15,639 CRACK SEAL AND SLURRY SEAL 11,715 $ 2030 CALLE FRONTERA CALLE JUAREZ CALLE SORPRESO 229 39 8,931 CRACK SEAL AND SLURRY SEAL 6,690 $ 2030 CALLE FRONTERA CALLE CUADRA CAMINO FARO 1,463 39 57,057 CRACK SEAL AND SLURRY SEAL 42,741 $ 2030 CALLE IGLESIA CALLE PINTORESCO CALLE IGLESIA 260 41 10,660 CRACK SEAL AND SLURRY SEAL 7,985 $ 2030 CAMINO SAN CLEMENTE PACIFIC COAST HWY VIA SOCORRO 1,761 39 68,679 CRACK SEAL AND SLURRY SEAL 51,447 $ 2030 CAMINO SAN CLEMENTE VIA SOCORRO END 282 39 10,998 CRACK SEAL AND SLURRY SEAL 8,239 $ 2030 CALLE CANASTA END CALLE CAMPANA 724 39 28,236 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 371,420 $ 2030 AVENIDA CORDOBA E VIA CATALINA VIA LA MESA 222 32 7,104 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 93,447 $ 2030 AVENIDA SALVADOR CALLE MONSERRAT VISTA VALINDA 1,359 39 53,001 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 697,183 $ 2030 CALLE BAHIA AVENIDA SANTA MARGARITA PRIVATE RD 950 30 28,500 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 240,721 $ 2030 AVENIDA LA COSTA CALLE MONTE CRISTO CALLE MONACO 324 35 11,340 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 95,782 $ 2030 OLA VISTA S AVENIDA GRANADA AVENIDA VICTORIA 250 25 6,250 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 52,790 $ 2030 CAPISTRANO LN AVENIDA DEL MAR SANTA ANA LN 414 25 10,350 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 87,420 $ 2030 AVENIDA MONTALVO AVENIDA LOBEIRO AVENIDA LOBEIRO 1,384 28 38,752 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 327,313 $ 2030 AVENIDA PALIZADA W ENCINO LN AVENIDA SERRA 400 40 16,000 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 135,142 $ 2030 VIA MIMOSA END AVENIDA SAN PABLO 400 35 13,960 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 117,911 $ 2030 AVENIDA SAN JUAN E EL CAMINO REAL S CALLE ALCAZAR 178 29 5,162 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 43,600 $ 2030 CALLE CORTEZ AVENIDA SAN CARLOS CALLE BALBOA 359 33 11,847 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 100,064 $ 2030 AVENIDA DEL MAR SANTA ANA LN AVENIDA SANTA BARBARA 122 30 3,660 RECONSTRUCT STRUCTURE (AC) 78,551 $ 2030 AVENIDA ARLENA END AVENIDA ARLENA 87 35 4,746 RECONSTRUCT STRUCTURE (AC) 101,859 $ 2030 ALTURA SOMBREADO ALDEANO 1,444 40 57,760 CRACK SEAL AND SLURRY SEAL 45,215 $ 2031 INCLINADO ESTAMPIDA AFLORAMIENTO 675 40 27,000 CRACK SEAL AND SLURRY SEAL 21,136 $ 2031 INCLINADO AFLORAMIENTO SOMBREADO 688 40 27,520 CRACK SEAL AND SLURRY SEAL 21,543 $ 2031 ENSENADA END ESTAMPIDA 209 40 8,360 CRACK SEAL AND SLURRY SEAL 6,544 $ 2031 PORTICO DEL NORTE EMINENCIA DEL SUR CABALLISTA DEL NORTE 420 39 16,380 CRACK SEAL AND SLURRY SEAL 12,822 $ 2031 PORTICO DEL SUR CAMINO DE LOS MARES SOMBREADO 1,613 39 62,907 CRACK SEAL AND SLURRY SEAL 49,244 $ 2031 ESTAMPIDA INCLINADO ENSENADA 395 40 15,800 CRACK SEAL AND SLURRY SEAL 12,368 $ 2031 ESTAMPIDA ENSENADA CADENA 275 40 11,000 CRACK SEAL AND SLURRY SEAL 8,611 $ 2031 ALFORJA END BONANZA 581 39 22,659 CRACK SEAL AND SLURRY SEAL 17,738 $ 2031 CABALLISTA DEL NORTE BONANZA JINETE 402 40 16,080 CRACK SEAL AND SLURRY SEAL 12,587 $ 2031 BONANZA CABALLISTA DEL SUR ESTRIBO 218 40 8,720 CRACK SEAL AND SLURRY SEAL 6,826 $ 2031 BONANZA ESTRIBO CAMINO DE LOS MARES 414 40 16,560 CRACK SEAL AND SLURRY SEAL 12,963 $ 2031 LLANO RIACHUELO RIACHUELO 1,085 40 43,400 CRACK SEAL AND SLURRY SEAL 33,974 $ 2031 CALLE HERALDO PANADERO CAMINANTE 220 40 8,800 CRACK SEAL AND SLURRY SEAL 6,889 $ 2031 CALLE VALLARTA AVENIDA VAQUERO CALLE AMABLE 938 39 36,582 CRACK SEAL AND SLURRY SEAL 28,636 $ 2031 CALLE VALLARTA CALLE BRISA CALLE CONTENTA 284 39 11,076 CRACK SEAL AND SLURRY SEAL 8,670 $ 2031 CALLE VALLARTA CALLE EMBOCADURA CALLE FRONTERA 596 39 23,244 CRACK SEAL AND SLURRY SEAL 18,195 $ 2031 11 of 12 449
Appendix A Seven-Year Road Maintenance and Rehabilitation Plan based on City's Current Funding Local Sorted by Treatment Year Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment Local Limits of Work CALLE DE LOS ALAMOS CALLE ROCA VISTA CALLE LASUEN 307 40 12,280 CRACK SEAL AND SLURRY SEAL 9,613 $ 2031 AVENIDA DE LOS LOBOS MARINOS W CALLE SERENA OLA VISTA S 320 40 12,800 CRACK SEAL AND SLURRY SEAL 10,020 $ 2031 CALLE ROCA VISTA CALLE PRIMAVERA AVENIDA DE LOS LOBOS MARINOS W 457 32 14,624 CRACK SEAL AND SLURRY SEAL 11,448 $ 2031 AVENIDA VALENCIA W AVENIDA GAVIOTA W CALLE DE LOS ALAMOS 412 28 11,536 CRACK SEAL AND SLURRY SEAL 9,030 $ 2031 ESPLANADE POCO PASEO CALLE TOLEDO 168 64 10,752 CRACK SEAL AND SLURRY SEAL 8,417 $ 2031 VIA BREVE LA VENTANA CAMINO CAPISTRANO 300 39 11,700 CRACK SEAL AND SLURRY SEAL 9,159 $ 2031 OLA VISTA S AVENIDA SANTIAGO W PASEO DE CRISTOBAL W 267 39 10,413 CRACK SEAL AND SLURRY SEAL 8,151 $ 2031 OLA VISTA S AVENIDA VALENCIA W AVENIDA PRINCESA 238 52 12,376 CRACK SEAL AND SLURRY SEAL 9,688 $ 2031 AVENIDA MADRID OLA VISTA S AVENIDA MONTEREY 516 40 20,640 CRACK SEAL AND SLURRY SEAL 16,157 $ 2031 CALLE DESHECHA AVENIDA ESTACION AVENIDA PICO 494 26 12,844 CRACK SEAL AND SLURRY SEAL 10,054 $ 2031 CALLE LA VETA CALLE GUAYMAS CAMINO MIRA COSTA 1,149 39 44,811 CRACK SEAL AND SLURRY SEAL 35,078 $ 2031 AVENIDA PALIZADA W AVENIDA SERRA AVENIDA MIRAMAR 301 40 12,040 CRACK SEAL AND SLURRY SEAL 9,425 $ 2031 AVENIDA PALIZADA W OLA VISTA N LOMA LN 446 40 17,840 CRACK SEAL AND SLURRY SEAL 13,965 $ 2031 AVENIDA MIRAMAR AVENIDA PALIZADA W OLA VISTA N 813 39 31,707 CRACK SEAL AND SLURRY SEAL 24,820 $ 2031 VIA PROMONTORIO AVENIDA ACAPULCO END 768 39 29,952 CRACK SEAL AND SLURRY SEAL 23,447 $ 2031 RINCON CT END CALLE DE LOS MOLINOS 395 39 15,405 CRACK SEAL AND SLURRY SEAL 12,059 $ 2031 VIA PICO PLZ AVENIDA PICO END 704 32 22,528 CRACK SEAL AND SLURRY SEAL 17,635 $ 2031 LA ESPERANZA N EL LEVANTE AVENIDA PRESIDIO 570 35 29,855 CRACK SEAL AND SLURRY SEAL 23,371 $ 2031 CALLE FRONTERA CALLE SORPRESO CALLE LUEGO 275 39 10,725 CRACK SEAL AND SLURRY SEAL 8,396 $ 2031 CALLE FRONTERA CALLE LUEGO CALLE CUADRA 1,003 39 39,117 CRACK SEAL AND SLURRY SEAL 30,621 $ 2031 CALLE SARMENTOSO CAMINO VERA CRUZ RIACHUELO 700 40 28,000 CRACK SEAL AND SLURRY SEAL 21,918 $ 2031 CALLE IGLESIA CALLE PINTORESCO CALLE PINTORESCO 1,187 41 48,667 CRACK SEAL AND SLURRY SEAL 38,097 $ 2031 CAMINO LA PEDRIZA CALLE AMISTAD CORTE CRISTIANITOS 542 36 19,512 CRACK SEAL AND SLURRY SEAL 15,274 $ 2031 CALLE CAMPANA END CALLE CANASTA 583 39 22,737 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 312,545 $ 2031 VIA SAN GORGONIO VIA SAN JACINTO CALLE VISTA TORITO 1,255 40 50,200 GRIND AND 3" AC OVERLAY WITH BASE REPAIR 690,053 $ 2031 AFLORAMIENTO END INCLINADO 404 40 16,160 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 142,635 $ 2031 CANADA W BUENA VISTA ESCALONES W 785 40 31,400 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 277,150 $ 2031 CALLE PUENTE ESCALONES W MARIPOSA W 252 40 10,080 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 88,970 $ 2031 CALLE DE LOS ALAMOS CALLE PRIMAVERA CALLE ROCA VISTA 393 40 15,720 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 138,751 $ 2031 ESPLANADE PASEO DE CRISTOBAL W VISTA MARINA 280 64 17,920 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 158,170 $ 2031 AVENIDA SAN GABRIEL E AVENIDA SAN PABLO END 422 33 13,926 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 122,917 $ 2031 CALLE REGLA END ENTRADA PARAISO 141 35 4,921 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 43,435 $ 2031 AVENIDA DE LOS LOBOS MARINOS E CALLE ALCAZAR END 457 20 9,140 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 80,674 $ 2031 AVENIDA PRESIDIO CALLE MIGUEL CALLE EMPALME 150 39 5,850 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 51,635 $ 2031 CALLE SOMBRA END CALLE AMANECER 613 44 26,972 GRIND AND 2" AC OVERLAY WITH BASE REPAIR 238,066 $ 2031 12 of 12 450
Pavement Management Plan Agency Submittal
P a g e | 11
XII. Appendix B Complete Listing of Current Street Conditions A complete listing of current pavement conditions should be included in this report. Specific data to be submitted should follow the format below: