RESOLUTION NO. 25-161
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CLEMENTE, CALIFORNIA, ACCEPTING AS COMPLETE THE EL CAMINO REAL CORRIDOR RUNOFF TREATMENT PROJECT, CIP PROJECT NO. 26802 WHEREAS, the State Water Resources Control Board, in an attempt to reduce trash, debris, and associated bacteria loading into the State’s waterways, authorized the Trash Provisions for municipal MS4 NPDES permit compliance in 2015; and WHEREAS, the City of San Clemente is required to implement, within high-traffic areas designated Priority Land Use (PLU) areas, full capture equivalency in its storm inlet network for trash down to 5 mm in size by the end of 2030; and WHEREAS, G2 Construction, Inc. currently contracts with the County of Orange under a Master Agreement to support municipalities throughout the County who wish to piggyback on their contract terms and pricing for specialized fabrication and installation of trash capture devices, as the City of San Clemente did previously in 2021, 2022, and 2024; and WHEREAS, on May 20, 2025, the City Council awarded a construction contract to G2 Construction, Inc. for Phase 4 of the storm inlet trash capture device installation program, titled the El Camino Real Corridor Runoff Treatment Project, CIP Project No. 26802; and WHEREAS, between May 22, 2025 and September 30, 2025, a total of 114 trash capture devices were fabricated and installed throughout a total of 71 City-owned catch basins, in compliance with the terms of G2 Construction, Inc.’s contract with the City; and WHEREAS, G2 Construction, Inc. has completed the work to the satisfaction of the Public Works Director/City Engineer.
NOW, THEREFORE, the City Council of the City of San Clemente does hereby resolve as follows:
SECTION 1. That the above recitations are true and correct.
SECTION 2. That the City Council accepts as complete the El Camino Real Corridor Runoff Treatment Project, CIP Project No. 26802, from G2 Construction, Inc.
SECTION 3. That the City Council authorizes the City Clerk to execute and record a Notice of Completion for the El Camino Real Corridor Runoff Treatment Project, CIP Project No. 26802.
SECTION 4. That the City Council authorizes the City Clerk to release the payment bond for this project 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against G2 Construction, Inc.
SECTION 5. That the City Council authorizes the City Clerk to release the performance bond for this project upon receipt of a warranty bond in the form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.
SECTION 6. The City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.
PASSED AND ADOPTED this _____ day of ____________________, 2025.
ATTEST:
___________________________ __________________________
City Clerk of the City of Steve Knoblock, Mayor of the
San Clemente, California City of San Clemente, California STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §
CITY OF SAN CLEMENTE )
I, LAURA CAMPAGNOLO, City Clerk of the City of San Clemente, California, do hereby certify that Resolution No. 25-161 was adopted at a regular meeting of the City Council of the City of San Clemente held on the _______ day of _______________________, _________, by the following vote:
AYES:
NOES:
ABSENT:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Clemente, California, this _____ day of _________________, ________. ________________________
CITY CLERK of the City of
San Clemente, California
Approved as to form:
___________________________
Elizabeth A. Mitchell, City Attorney
Resolution No. 25-161 Page 2
Attachment 1