SECTION 4 I PROJECT ORGANIZATION AND STAFFING F'Jgt-' 121 ll<E
implementation of a temporary pump station for interim service. Mr.

Counce provided daily inspection and monitoring to ensure construction of the project was in accordance with the approved plans and specifications.
• CV Sync Traffic Signal Synchronization, City of Palm Desert - Mr. Counce serves as the Public Works/Electrical Inspector assisting in oversight of all construction activities for Phase 1 of the CV Sync project (Formerly CVAG TSSPP). This work involves plan review, coordination of construction scheduling, invoicing field work, local agency procedures and more. As the Local Agency inspector, Mr. Counce ensures adherence with applicable State and Federal requirements requiring familiarity with the CAMUTCD, Caltrans Standard Plans, Caltrans Construction Manual, Local Agency Procedures Manual and other applicable standards and documents.
• Berg Electric Loma Linda University Medical Center, City of Loma Linda - Mr. Counce served as a Certified Electrician on LLUMC 10-year capitalimprovement program that addressed not only HVAC, ADA and seismic upgrades, but also space needs into the future. Berg Electric has supported LLUMC in its current construction of the $823 million-dollar, tallest hospital in California, standing at 267 feet above ground, with 17 total stories (16 above ground), and the tallest building in San Bernardino County.
• Berg Electric, Indian Wells - Mr. Counce served as a Certified Electrician on Indian Wells Tennis Garden stadium renovation which required over 100,000-man hours from Berg Electric within a nine-month period.

Additionally, a 200-person hospitality room, Front Box Club, satellite broadcast studio, fitness center, and club pro shop also made their debut for the 2017 BNP Paribas Open. Other renovations worth noting include a brand-new media room, two-story office building for tournament management and staff, and additional commissaries to accommodate the new concessions.
• Berg Electric, City of San Bernardino - Mr. Counce served as a Certified Electrician on economic stimulus-related "green" projects. Install new or upgrade existing systems and equipment at major college facilities to achieve energy conservation goals.

RFP I Reeves Booster Pump Station and Calle Real Pump Station Rehabilitation Projects CM & Inspection Services City of San Clemente

SECTION 7 I COST DATA
Page I 28
I SECTION 7 COST DATA
City of San Clemente
Reen·s Booster Pump Station and Calle Real Pump Station Rehabilitation Projects Construction :Management & Inspection Services
Task No. Task
Scope of Senices
Task 1
Task 2
Task3
Task4
Task5
Task6
Task i
Task8
Construction Management \Vork Plan
Quality Assurance/Quality Conu-ol
Project Coordination
Pre-and Post-Project Photo and Video Documentation
Maintain Document M=gement System
Communication and Correspondence
Consn·uction Schedule Re,;ew and Monitoring
Submittal Review and Management
Task 9 Consn.1ction Monitoring. Observation. Inspection. and Testing!> Task JO NPDES Comphance
Task 11 Request for Infonnmion (RFI) Management
Task 12 Change Order (CO) Management
Task 13 Management of Progress Payments
Task 14 Claims and Disputes Re";ew
Task 15 Project Closeout Coordination
Task 16 Record Drawings Re";ew
R.1tes:

Pri.ncipalu1 Charge 'S
Cons tn1ctiou J\.lan3 gt:r s
Project_Engineer s
Resiaenr. Specialty Inspector s
Clerical s
190
180
170
140
95 'HR
HR
/HR
/HR
/HR
Subtotal:

Consulting EnginE'ering FE'E'
Principle In Charge
How·s S
4 4
s
4 12
s
s
12 8
s
s
$
$
$
$
s
s
$
$
s
$
$
s
s
s
760
760

1.520
760

2.280

1.520

1.520

2.2S0
J.520
68 $ 12.920
Constn1ction Manager
Hours $
8 s 1.440
12 $ 2.160
64 $ 11.520
4 s 720
s $ 1.440
16 $ 2.8S0
s $ 1.440
40 $ 7.200
16 $ 2.SS0
8 $ 1.440
20 s 3.600
16 $ 2.880
16 s 2.8S0
24 s 4.320
12 s 2.160
12 s 2.160
284 s 51.120
Project Engineer
Hours $
16 s 2.720
24 $ 4.0S0
128 s 21.760
12 $ 2.040
16 $ 2.720
32 s 5.440
16 $ 2.720
120 $ 20.400
32 s 5.440
16 $ 2.720
40 s 6.800
32 $ 5.440
16 s 2.720
32 s 5.440
24 $ 4.080
24 s 4.0S0
580 s 9S.600
Resident Inspector /
Specialty Inspector
Hom·s S
12 2400
8 s
16 so
16 2.540
s
s
s
s
s
s
s
$
s
s
s
s
s
s
s
s
$

1.680
336.000

1.120

1.120

2.240

11.200

2.240
355.600
Cle,;cal
Hours $
s $
12 s
64 s
8 s
24 s
16 s
8 s
60 $
16 s
8 s
20 s
16 s
16 $
12 $
12 s
12 s
760

1.140

6.080
760

2.2S0

1.520
760

5.700

1.520
760

1.900

1.520

1.520

1.140

1.140

1.140
312 s 29.640
Reimbursables (@3%{>,
s
s
s
s
s
s
$
s
s
s
s
s
s
s
s
$
$
s
Construction :\lauagemeut Total: S
'.\"otes:

1.) Rei.mbursables Include Cost for Piint.s. Copies. Mileage. Etc.

2.) Assmnes Cousn.1ction Period of 300 Working Days per the RFP

3.) Overnll CM Sen;oces Assumes Approximately 3 Hotu·s per Day for 360 Working Days per the RFP Total
$

5.680

8.140

39.360

5.200

6.440

11.360

5.680

35.580
345.S40

4.920

14.940

12.480

9.360

13.1S0

20.100

9.620
547.S80

16.436
'-6-UI6
TKE Engineering, Inc.
lKE . ..;.R�F�Pl:..;.;R_ ee�v.e�s�B�o�o�s�t�e� � r�P�u�m�pc:....;.S�ta �t�io�n.;.,,;.a.n.d.c. a.11re_R�e�a-l P_u__m�p--St_a_t _i o_n_R_e_ha_b_i_li_ta_t_io_n_P_ro�j�e.ct_s_c _M_&_1_n.sp_e_c_t_io_n_s_e_r_i vc_e_s ___________________ _ City of San Clemente
See next page for revised fee Schedule
for Calle Real Pump Station
Rehabilitation Project only.

MEMORANDUM
Date: January 8, 2026 Job# E000-2515
To: Amir Ilkhanipour, P.E.

Principal Civil Engineer
City of San Clemente
From: Joanna Rembis, P.E., Q.S.D.

Project/Construction Manager
TKE Engineering, Inc.

Subject: RFP – Reeves Booster Pump Station and Calle Real Pump Station Rehabilitation Projects CM & Inspection
Thank you for your time on the phone regarding the Calle Real and Reeves Pump Station Projects. Per the City’s request, TKE has divided the previously submitted fee schedule for providing Construction Management and Inspection services into two separate and equal fee schedules, addressing each project individually.

TKE understands that the City originally bid these projects simultaneously with the intent for construction to run concurrently. However, due to unforeseen circumstances requiring the Reeves Pump Station Project to be rebid, construction for the two projects will no longer proceed at the same time.

In accordance with the RFP, TKE based its proposal on providing one inspector whose time would be split evenly (50/50) between both projects. TKE remains committed to working with the City to minimize cost impacts associated with the revised schedule and proposes the following approach for construction management and inspection services:
• During initial project activities, such as contractor mobilization, demolition, and other early tasks that do not involve substantial construction, TKE’s inspector will be on-site as required, not to exceed four hours per day.
• As the contractor progresses into major construction activities, such as piping, foundations, pump cans, and similar work, TKE recommends full-time, on-site inspection to adequately monitor construction and ensure compliance with project requirements. • Work closely with City Staff and utilize as a resource to help support daily construction management duties.

TKE notes that, based on recent experience working with the awarded contractor on another pump station project, several issues were encountered where continuous on-site inspection was critical to identifying and correcting improper work and enforce the construction schedule. The recommended inspection approach is intended to balance the City’s budget constraints while maintaining quality, compliance, and effective project oversight throughout construction.

TKE will continue to make every effort to manage inspection resources efficiently and remain within the proposed inspection hours. However, due to the projects no longer proceeding concurrently, there is the potential for additional inspector hours over the course of construction.

Should additional hours be required TKE will endeavor to reallocate unused construction management task hours to support field inspections prior to requestion a change order.

Total
Task No. Task Hours $ Hours $ Hours $ Hours $ Hours $ $ Scope of Services
Task 1 Construction Management Work Plan 2 $ 380 4 $ 720 8 $ 1,360 $ - 4 $ 380 $ 2,840 Task 2 Quality Assurance/Quality Control 2 $ 380 6 $ 1,080 12 $ 2,040 $ - 6 $ 570 $ 4,070 Task 3 Project Coordination $ - 32 $ 5,760 64 $ 10,880 $ - 32 $ 3,040 $ 19,680 Task 4 Pre-and Post-Project Photo and Video Documentation $ - 2 $ 360 6 $ 1,020 6 $ 840 4 $ 380 $ 2,600 Task 5 Maintain Document Management System $ - 4 $ 720 8 $ 1,360 $ - 12 $ 1,140 $ 3,220 Task 6 Communication and Correspondence 4 $ 760 8 $ 1,440 16 $ 2,720 $ - 8 $ 760 $ 5,680 Task 7 Construction Schedule Review and Monitoring 2 $ 380 4 $ 720 8 $ 1,360 $ - 4 $ 380 $ 2,840 Task 8 Submittal Review and Management 6 $ 1,140 20 $ 3,600 60 $ 10,200 $ - 30 $ 2,850 $ 17,790 Task 9 Construction Monitoring, Observation, Inspection, and Testing2.) $ - 8 $ 1,440 16 $ 2,720 1200 $ 168,000 8 $ 760 $ 172,920 Task 10 NPDES Compliance $ - 4 $ 720 8 $ 1,360 $ - 4 $ 380 $ 2,460 Task 11 Request for Information (RFI) Management 4 $ 760 10 $ 1,800 20 $ 3,400 4 $ 560 10 $ 950 $ 7,470 Task 12 Change Order (CO) Management 4 $ 760 8 $ 1,440 16 $ 2,720 4 $ 560 8 $ 760 $ 6,240 Task 13 Management of Progress Payments $ - 8 $ 1,440 8 $ 1,360 8 $ 1,120 8 $ 760 $ 4,680 Task 14 Claims and Disputes Review 6 $ 1,140 12 $ 2,160 16 $ 2,720 $ - 6 $ 570 $ 6,590 Task 15 Project Closeout Coordination 4 $ 760 6 $ 1,080 12 $ 2,040 40 $ 5,600 6 $ 570 $ 10,050 Task 16 Record Drawings Review $ - 6 $ 1,080 12 $ 2,040 8 $ 1,120 6 $ 570 $ 4,810 Subtotal: 34 $ 6,460 142 $ 25,560 290 $ 49,300 1,270 $ 177,800 156 $ 14,820 $ 273,940 Reimbursables (@3%)

1.)
: $ 8,218
Construction Management Total: $ 282,158
Rates: Notes:

Principal In Charge $ 190 /HR 1.) Reimbursables Include Cost for Prints, Copies, Mileage, Etc.

Construction Manager $ 180 /HR
Project Engineer $ 170 /HR
Resident/Specialty Inspector $ 140 /HR 3.) Overall CM Services Assumes Approximately 1.5 Hours per Day for 360 Working Days per the RFP Clerical $ 95 /HR
TKE Engineering, Inc.

2.) Assumes As-Needed Inspection Over the Construction Period of 300 Working Days per the RFP.

A 2-Hour minimum charge will occurr for an inspector arriving on site.

City of San Clemente
Calle Real Pump Station Rehabilitation Project
Construction Management & Inspection Services
Consulting Engineering Fee
Principle In Charge Construction Manager Project Engineer Resident Inspector /
Specialty Inspector Clerical
Total
Task No. Task Hours $ Hours $ Hours $ Hours $ Hours $ $ Scope of Services
Task 1 Construction Management Work Plan 2 $ 380 4 $ 720 8 $ 1,360 $ - 4 $ 380 $ 2,840 Task 2 Quality Assurance/Quality Control 2 $ 380 6 $ 1,080 12 $ 2,040 $ - 6 $ 570 $ 4,070 Task 3 Project Coordination $ - 32 $ 5,760 64 $ 10,880 $ - 32 $ 3,040 $ 19,680 Task 4 Pre-and Post-Project Photo and Video Documentation $ - 2 $ 360 6 $ 1,020 6 $ 840 4 $ 380 $ 2,600 Task 5 Maintain Document Management System $ - 4 $ 720 8 $ 1,360 $ - 12 $ 1,140 $ 3,220 Task 6 Communication and Correspondence 4 $ 760 8 $ 1,440 16 $ 2,720 $ - 8 $ 760 $ 5,680 Task 7 Construction Schedule Review and Monitoring 2 $ 380 4 $ 720 8 $ 1,360 $ - 4 $ 380 $ 2,840 Task 8 Submittal Review and Management 6 $ 1,140 20 $ 3,600 60 $ 10,200 $ - 30 $ 2,850 $ 17,790 Task 9 Construction Monitoring, Observation, Inspection, and Testing2.) $ - 8 $ 1,440 16 $ 2,720 1200 $ 168,000 8 $ 760 $ 172,920 Task 10 NPDES Compliance $ - 4 $ 720 8 $ 1,360 $ - 4 $ 380 $ 2,460 Task 11 Request for Information (RFI) Management 4 $ 760 10 $ 1,800 20 $ 3,400 4 $ 560 10 $ 950 $ 7,470 Task 12 Change Order (CO) Management 4 $ 760 8 $ 1,440 16 $ 2,720 4 $ 560 8 $ 760 $ 6,240 Task 13 Management of Progress Payments $ - 8 $ 1,440 8 $ 1,360 8 $ 1,120 8 $ 760 $ 4,680 Task 14 Claims and Disputes Review 6 $ 1,140 12 $ 2,160 16 $ 2,720 $ - 6 $ 570 $ 6,590 Task 15 Project Closeout Coordination 4 $ 760 6 $ 1,080 12 $ 2,040 40 $ 5,600 6 $ 570 $ 10,050 Task 16 Record Drawings Review $ - 6 $ 1,080 12 $ 2,040 8 $ 1,120 6 $ 570 $ 4,810 Subtotal: 34 $ 6,460 142 $ 25,560 290 $ 49,300 1,270 $ 177,800 156 $ 14,820 $ 273,940 Reimbursables (@3%)

1.)
: $ 8,218
Construction Management Total: $ 282,158
Rates: Notes:

Principal In Charge $ 190 /HR 1.) Reimbursables Include Cost for Prints, Copies, Mileage, Etc.

Construction Manager $ 180 /HR
Project Engineer $ 170 /HR
Resident/Specialty Inspector $ 140 /HR 3.) Overall CM Services Assumes Approximately 1.5 Hours per Day for 360 Working Days per the RFP Clerical $ 95 /HR
TKE Engineering, Inc.

2.) Assumes As-Needed Inspection Over the Construction Period of 300 Working Days per the RFP.

A 2-Hour minimum charge will occurr for an inspector arriving on site.

City of San Clemente
Reeves Booster Pump Station Project
Construction Management & Inspection Services
Consulting Engineering Fee
Principle In Charge Construction Manager Project Engineer Resident Inspector /
Specialty Inspector Clerical