(, :(:7:g6QJ,(:779gN J @ @ N T €2 a C T O R 8 A N D E! N 01 N El a R I CA Contractor License #300068
DIR #1000004443
condon-joh nson.com
February 11, 2026
(Via E-mail Only - 2 pages)
CJA-25069-SL-Oal4r3
Orange County Transportation Authority
550 South Main Street
Orange, CA 92868
Attn: Jason Lee
Jleel @octa.net
RE: Costal Rail Stabilization Priority Projects
Request for Change Order to Refine Sewer Pipe
Revision 3
Jason,
Condon-Johnson & Assoc., Inc. (CJA) offers to setup, test, and operate a sewer bypass for Sancon, who will be working directly for the City of San Clemente, to install a CIPP liner between manholes 5 and 7. CJA is providing this proposal based on the documents provided and discussions with all parties involved on this project.

PRICING
Item Description UOM Quantity Unit Price ' Extension
1 BONDS LS I 13,290 13,290
2 RR AND BR INSURANCE LS 1 30,530 30,530
3 PROJECT MANAGEMENT LS 1 101,885 101,885
4 PROJECT SCHEDULES LS I 3,905 3,905
5 SAFETY REQUIREMENTS LS 1 100,820 100,820
6 SITE SECURITY LS 1 ll ,005 11,005
7 QUALITY CONTROL LS 1 11,715 11,715
8 INSPECTION AND TESTING LS 1 66,740 66,740
9 CONSTRUCTION FACILITIES LS I 8,165 8,165
10 TEMPORARY BARRICADES LS I 12,957 12,957
11 SWPP LS 1 12,936 12,936
12 WASTE MANAGEMENT LS 1 1,863 1,863
13 POTHOLING LS 1 9,000 9,000
14 SEWER BYPASS LS I 250,600 250,600
15 CIPP LINER SUPPORT LS 1 55,500 55,500
Total $ 690,911
The scope of work includes:
17 working day, 21 calendar day delay to the project.

Pothole existing utilities for buried sections of bypass-1 day.

Sewer Bypass setup and testing - 7 days.

Support install (by others) of CIPP liner from SMH 5 to SMH 7 with 24n pump watch - 2 to 3 days.

Remove sewer bypass and restore access - 3 days.

DEEP FOUNDATIONS - EARTH RETENTION aROUND IMfROVEMENT EXCAVATION DEWATERINa Kent WA ii Portland OR Bozeman MT ii Denver CO * Oakland CA ii Antioch CA Los Angeles CA Laguna Hills CA ii Ontario CA ii San Diego CA Attachment 3
Condon-Johnson & Assoc., Inc.

Area 3 - Pedestrian Trail and Catchment Wall
SL-014r3
February 'l i2026

Page 2 ends

Exclusions:

Permits, dewatering permit and any costs for dewatering.

Any reclaimed water work.

Any utility relocations.

Handling and disposal of contaminated and/or hazardous soils/ materials.

Manhole replacement or any work on manholes.

Any risk for condition of existing pipe.

Odor control monitoring or mitigation.

Sound barriers (pumps will run 24/7).

Vactor truck standby for bypass.

Bypassing or working over holidays.

Work over holidays
If you have any questions or require additional information, feel free to contact me at (858) 722-8822 or [email protected].

Sincerely,
Condon-BJ !rrOug c.

Regional VP