February 5, 2026
City of San Clemente
910 Calle Negocio
San Clemente, CA 92673
ATTN: Mr. Amir llkhanipour
Principal Engineer
553 Wald, Irvine, CA 92618
Telephone: 949.753.7333 I Fax: 949.753.7320
www.akmce.com
Proposal: Engineering Services During Construction of Reeves Booster Pump Station
Dear Mr. llkhanipour:
In response to the City of San Clemente's request, AKM Consulting Engineers (AKM) is pleased to submit this proposal for providing Engineering Services During Construction of the Reeves Booster Pump Station project.
The Scope of services will consist of:
1. Attending the Pre-Construction meeting, as well as weekly construction progress meetings (remote)
2. Reviewing and responding to Requests for Information (RFI) during the project.
Two (2) reviews are budgeted for each RFI.
3. Reviewing the Shop Drawing Submittals. Two (2) reviews are budgeted for each submittal
4. Prepare plan revisions - Two (2) are budgeted
5. Conduct site reviews during construction, as requested by the City. Four (4) site reviews are budgeted.
6. Participate in the startup and commissioning of the project (2 days)
7. Prepare Record Drawings based on the Contractor's red-lined as-built drawings reviewed by the City's construction manager.
The work will be performed by AKM's Project Manager (Zeki Kayiran, P.E), Project Engineer (Darrik Baker, P.E., an Associate Engineer, and our CAD staff.
AKM Prop. 26-1027
Attachment 4
Reeves Booster Pump Station
Proposal for ESDC
We propose completing this scope of work on a time and materials basis for a not-toexceed estimate of $183,048 as detailed in the table below. We will request additional authorization should the project requires additional work.
Project Project CAD Total Expenses Cost
Task Description Manager Engineer Operator Hours
$261 $248 $124
1 Meetings 16 64 80 $500 $20,548
2 Review and Respond to RF ls 20 180 200 $49,860
3 Shop Drawing Submittal Reviews 28 288 316 $78,732
4 Plan Revisions 8 16 32 56 $10,024
5 Site Reviews During Construction 8 16 24 $400 $6,456
6 Startup and Commissioning 12 24 36 $400 $9,484
7 Record Drawings 4 48 52 $1,000 $7,944
Total- Hours .. 92 592 .. 80 764
Total Cost $24,012 $146,816 $9,920 $2,300 $183,048
We appreciate the opportunity to submit this proposal and look forward to being of service to the City of San Clemente. Should you have any questions regarding the contents of our proposal, please do not hesitate to contact the undersigned or Darrik Baker.
AKM Consulting Engineers
Zeki Kayiran, P.E.
Principal
949.753.7333 - 120
[email protected]
AKM Prop. 26-1027