Client: Date:
Contact: Written By:
Address: Quote Number:
City, State, Zip: Phone:
Project: Email:
Phone: Project Address:
Email:
Work Summary: Lake Park Well New Equipment/Installation Line Item Taxable Qty U/M Cost/Ea. Sub-Total
1 1 LS $5,800.00 $5,800.00
2 48 HR $115.00 $5,520.00
9 HR $115.00 $1,035.00
3 T 4 EA $975.61 $3,902.44
T 4 EA $926.83 $3,707.32
T 1 EA $368.29 $368.29
T 1 EA $34,390.24 $34,390.24
T 32 EA $3,048.78 $97,560.98
T 13 EA $36.59 $475.61
T 650 FT $2.38 $1,545.73
T 1 LS $1,097.56 $1,097.56
1 LS $2,439.02 $2,439.02
4 50 HR $205.00 $10,250.00
50 HR $207.00 $10,350.00
50 HR $250.00 $12,500.00
100 HR $164.00 $16,400.00
10 HR $250.00 $2,500.00
Sub-Total $209,842.20
Additional Terms and Conditions 8.75% Sales Tax $12,516.71 1 Price based on current MSA rates Total $222,358.91
2 Price is based on acceptable ingress and egress to site.
Layne Christensen Company City of San Jacinto
6/12/2025
Mark Howard, Area Manager Date Date
[email protected]
Service Truck and one man
2 addonal helpers
One (1) Electrican and Service Truck
12" x 3-1/2" x 2-3/16" x 20' T7C .330W CTS Goulds
3-1/2" X 12" B/W Spiders
Remove well pump and transport to facility for inspection 75 Ton Hydraulic Crane
Crane Operator
1/4" SS Airline
Discharge Head ( Sand Blast and Powder Coat )
Freight
Motor Inspection (price to be determined)
EMB25035-2
760-250-6198
[email protected]
Lake Park Well
595 S.San Jacinto
Lake Park Well New Equipment/Installation
951 537 7721
San Jacinto , Ca 92853
PROPOSAL
June 12, 2025
Todd Howard
City of San Jacinto
Matt Osborn
San Jacinto , Ca 92853
Description
Thank you for the opportunity to be your water resource solution.
Mobilization and Demobilization
Refurbish pump equipment and machine work
Shop Labor - Machinist
Shop Labor - Machinist
Prices are valid for 30 days from date of proposal
New pump equipment
10"x20' Certalok Casing .032 Screen
10"x20' Certalok Casing Blanks
10" Threaded Certalok Adapter
14RHMC-9stg O/L Bowl Assembly