23/24 Effective 7/1/2024 Effective 7/1/2025
CPI 4.30% 1.10%
Building Valuation
$1 to $500 $25.65 $26.75 $27.04
$501 to $2,000
$25.65 for the first $500 plus
$3.33 for each additional $100 or
fraction thereof, to and including
$2,000
$26.75 for the first $500 plus
$3.47 for each additional $100 or
fraction thereof, to and including
$2,000
$27.04 for the first $500 plus
$3.51 for each additional $100 or
fraction thereof, to and including
$2,000
$2,001 to $25,000
$75.59 for the first $2,000 plus
$15.28 for each additional $1,000
or fraction thereof, to and
including $25,000
$78.84 for the first $2,000 plus
$15.94 for each additional $1,000
or fraction thereof, to and
including $25,000
$79.71 for the first $2,000 plus
$16.12 for each additional $1,000
or fraction thereof, to and
including $25,000
$25,001 to $50,000
$427.61 for the first $25,000 plus
$11.02 for each additional $1,000
or fraction thereof, to and
including $50,000
$446.00 for the first $25,000 plus
$11.49 for each additional $1,000
or fraction thereof, to and
including $50,000
$450.91 for the first $25,000 plus
$11.62 for each additional $1,000
or fraction thereof, to and
including $50,000
$50,001 to $100,000
$702.68 for the first $50,000 plus
$7.64 for each additional $1,000
or fraction thereof, to and
including $100,000
$732.90 for the first $50,000 plus
$7.97 for each additional $1,000
or fraction thereof, to and
including $100,000
$740.96 for the first $50,000 plus
$8.06 for each additional $1,000
or fraction thereof, to and
including $100,000
$100,001 to $500,000
$1,084.71 for the first $100,000
plus $6.11 for each additional
$1,000 or fraction thereof, to and
including $500,000
$1,131.35 for the first $100,000
plus $6.37 for each additional
$1,000 or fraction thereof, to and
including $500,000
$1,143.79 for the first $100,000
plus $6.44 for each additional
$1,000 or fraction thereof, to and
including $500,000
$500,001 to $1,000,000
$3,529.76 for the first $500,000
plus $5.18 for each additional
$1,000 or fraction thereof, to and
including $1,000,000
$3,681.54 for the first $500,000
plus $5.40 for each additional
$1,000 or fraction thereof, to and
including $1,000,000
$3,722.04 for the first $500,000
plus $5.46 for each additional
$1,000 or fraction thereof, to and
including $1,000,000
$1,000,001 and up
$6,122.15 for the first $1,000,000
plus $3.98 for each additional
$1,000 or fraction thereof
$6,385.40 for the first $1,000,000
plus $4.15 for each additional
$1,000 or fraction thereof
$6,455.64 for the first $1,000,000
plus $4.20 for each additional
$1,000 or fraction thereof
PLAN CHECK FEE: Combination Permits (Residential or Commercial)

CALIFORNIA BUILDING STANDARDS COMMISSION FEE
STRONG MOTION INSTRUMENTATION PROGRAM (SMIP) FEE: Residential STRONG MOTION INSTRUMENTATION PROGRAM (SMIP) FEE: Commercial PERMIT ISSUANCE FEE (ALL PERMITS) $47 $49 $49
CERTIFICATE OR TEMPORARY CERTIFICATE OF OCCUPANCY $57 $59 $59 DEMOLITION PERMIT: $116 $120 $121
REROOF $74 $77 $77
Fire and Life Safety Service Fee:

Energy Conservation Review:

Imaging and Storage:

New Addressing (per lot or location) $28 $29 $29
After Hours Holiday Inspections (when available): (2 hour minimum) (per hour) $233 $243 $245
After Hours Inspections (when available): (2 hour minimum) (per hour) $150 $156 $157 Duplicate Permit or Inspection Card (city printed): $28 $29 $29 Expedited Plan Check (when available)
Inspection Fee (after 2 failed inspections): (1 hour minimum) (per hour) $94 $98 $99 Investigation Inspections:

Permit Transfer Fee: $28 $29 $29
Plan Check Revisions: per hour $116 $120 $121
Other Inspections not otherwise listed: $116 $120 $121
GENERAL PLAN MAINTENANCE FEE:

TECHNOLOGY FEE:

Annual: $90 $93 $94
65% of Building Permit fee above
$1 per every $25,000, or portion thereof, in construction valuation Residential Structures: Valuation X 0.0013 = SMIP Fee
Commercial Structures: Valuation X 0.0028 = SMIP Fee

0.10% of Valuation
15% of Building Permit Fee

0.02% of Valuation plus $5 per sheet for all plans required to be retained indefinitely by state law All Permit or Entitlement Fees X 1.9%
100% of Plan Check Fee
All Permit or Entitlement Fees X 5%
100% of Plan Check Fee
City of San Jacinto
Comprehensive User Fee Schedule
23/24 Effective 7/1/2024 Effective 7/1/2025
CPI 4.30% 1.10%
Single Trip: $16 $16 $16
Mobile Home Permits
Mobile Home Building Permit Fee
Mobile Home Plan Check Fee
Mobile Home Awning (each) $37 $38 $38
Mobile Home Installation (per lot) $191 $199 $201
Mobile Home Patio Room (each) $103 $107 $108
Mobile Home Permanent Foundation (per lot) $132 $137 $138 Mobile Home Porch / Deck (each) $60 $62 $62
Deck or Patio
Deck or Patio – City Standard (each) $113 $117 $118
Deck or Patio – Non-City Standard (each) $226 $235 $237 Electrical Trade Permits
Electrical Building Permit Fee
Electrical Plan Check Fee
Outlets/Receptacles/Switches/Fixtures/Sockets (per unit) $2 $2 $2 Temporary Power Pole (per unit) $47 $49 $49
Dwelling Re-Wire (Partial)(per unit) $148 $154 $155
Dwelling Re-Wire (Full)(per unit) $297 $309 $312
Service Upgrades or Changes
Up to 200A(per unit) $61 $63 $63
201A to 1000A(per unit) $124 $129 $130
Over 1000A(per unit) $191 $199 $201
Switchboards (sub-panels)
Up to 600V(per unit) $66 $68 $68
Over 600V(per unit) $132 $137 $138
Motors, generators, transformers
Up to 3 HP/KW/KVA(per unit) $24 $25 $25
3 to 50 HP/KW/KVA(per unit) $49 $51 $51
OVER 50 HP/KW/KVA(per unit) $99 $103 $104
Special Event Electrical - Per Connection(per unit) $37 $38 $38 Additional Electrical System Not Otherwise Listed(per unit) $23 $23 $23 Mechanical Trade Permits
Mechanical Building Permit Fee
Mechanical Plan Check Fee
Air Handler (per unit) $29 $30 $30
Boiler, A/C Units / Compressors
Up to 3 HP/Ton OR 100,000 BTU (per unit) $29 $30 $30
3-15 HP/Ton (per unit) $40 $41 $41

15.1 to 30 HP/Ton (per unit) $52 $54 $54

30.1 to 50 HP/Ton (per unit) $64 $66 $66
Over 50 HP/Ton OR 175K BTU (per unit) $87 $90 $90
Duct Or Vents (Linear Feet) (per 100 linear feet) $11 $11 $11 Evaporation Coolers (per unit) $21 $21 $21
Exhaust Hood (per unit) $21 $21 $21
Furnace (per unit) $29 $30 $30
Heating, Refrigeration, Cooling, Absorption, Unit Or System Repair (per unit) $27 $28 $28
Incinerators (per unit) $29 $30 $30
Ventilation And Exhaust Fan (per unit) $11 $11 $11
Additional Mechanical Not Otherwise Listed (per unit) $21 $21 $21 Plumbing Trade Permits
Plumbing Building Permit Fee
Plumbing Plan Check Fee
Fixtures And Traps (per unit) $19 $19 $19
65% of the Building Permit Fee
Sum of Plumbing Fees
65% of Plumbing Building Permit Fee
Sum of Mobile Home Fees
65% of Mobile Home Permit Fee
Sum of Electrical Items
65% of Electrical Permit Fee
Sum of all Mechanical Fees
City of San Jacinto
Comprehensive User Fee Schedule
23/24 Effective 7/1/2024 Effective 7/1/2025
CPI 4.30% 1.10%
Interceptor / Grease Trap (per unit) $39 $40 $40
Water Piping (per unit) $9 $9 $9
Rainwater System (Per Drain) (per unit) $19 $19 $19
Private Sewer / Septic System (each connection) $132 $137 $138 Sewer Connection (each connection) $49 $51 $51
Repair Alteration Of Drain Or Vent (per unit) $9 $9 $9
Backflow Preventer (per unit) $37 $38 $38
Dwelling Re-Pipe (Full) (per unit) $34 $35 $35
Water Heaters (per unit) $24 $25 $25
Gas Piping (per unit) $12 $12 $12
Additional Plumbing System Not Otherwise Listed (per unit) $19 $19 $19 Pool & Spa Permits
Pool & Spa Building Permit Fee
Pool Plan Check Fee (per permit) $132 $137 $138
Pool / Spa Equipment (per unit) $66 $68 $68
Gas Connection (per connection) $37 $38 $38
Sign Permits
Sign Building Permit
Sign Plan Check
Lighting or Marquees from One Circuit (per unit)
$49 $51 $51
Additional Lighting Or Marquees Circuit On Same Sign (per unit) $9 $9 $9
Solar Permits
Solar Review Building Permit Fee (1 hour minimum) (per hour) $116 $120 $121 Solar Inspection Fee (up to 2 inspections) (per permit) $265 $276 $279 Wall & Fence Permits
Wall and Fence Building Permit Fee (per 300 linear feet) $30 $31 $31 Wall and Fence Plan check Fee (per 100 linear feet) $56 $58 $58 Grading Permits:

PERMIT FEE
50 cubic yards or less $47 $49 $49
51 to 100 cubic yards $74 $77 $77
101 to 1,000 cubic yards $74 $77 $77
1,001 to 10,000 cubic yards $234 $244 $246
10,001 to 100,000 cubic yards for the first 10,000 cubic yards $393 $409 $413
100,001 cubic yards or more for the first 100,000 cubic yards $987 $1,029 $1,040
Grading Permits:

PLAN CHECK FEE
50 cubic yards or less $47 $49 $49
51 to 100 cubic yards $47 $49 $49
101 to 1,000 cubic yards $74 $77 $77
1,001 to 100,000 cubic yards
$98 $102 $103
100,001 to 200,000 cubic yards for the first 100,000 cubic yards $539 $562 $568
200,001 or more for the first 200,000 cubic yards $804 $838 $847 Sum of Pool and Spa Fees
Valuation Table
65% of Building Permit Fee
City of San Jacinto
Comprehensive User Fee Schedule
23/24 Effective 7/1/2024 Effective 7/1/2025
CPI 4.30% 1.10%
Encroachment and Construction Permits:

Encroachment Permit Fee $47 $49 $49
Encroachment Inspection Fee $78 $81 $81
Encroachment Plan Check
Subdivision, CUP, Site Plan, and new Construction Projects - Plan Check Subdivision, CUP, Site Plan, and new Construction Projects - Inspection Fire Hydrant, Blue Dot, Water Service, Sewer Lateral, other not included above
Final Map Check, Lot Line Adjustments, Vacations
Final Subdivision Map Check
1-4 Lots (base) $1,150 $1,199 $1,212
5-12 Lots (base) $1,725 $1,799 $1,818
13-49 Lots (base) $2,300 $2,398 $2,424
50+ Lots (base) $3,450 $3,598 $3,637
1-4 Lots (per lot) $58 $60 $60
5-12 Lots (per lot) $46 $47 $47
13-49 Lots (per lot) $35 $36 $36
50+ Lots (per lot) $23 $23 $23
Right-of-Way Vacation (Summary) (actual cost plus $2,500 deposit) Right-of-Way Vacation (Standard) (actual cost plus $10,000 deposit) Lot Line Adjustment / Merger (application fee plus $2,300 deposit) $200 $208 $210 NPDES
Industrial – High Priority $232 $241 $243
Industrial – Medium Priority $185 $192 $194
Industrial – Low Priority $92 $95 $96
Restaurants – High Priority $77 $80 $80
Restaurants – Medium Priority $61 $63 $63
Restaurants – Low Priority $46 $47 $47
Commercial – High Priority $67 $69 $69
Commercial – Medium Priority $56 $58 $58
Commercial – Low Priority $46 $47 $47
Other – Inactive / Residential / Non-Inspection $23 $23 $23 Post Construction BMP (Residential & Commercial) $154 $160 $161 Fee Type
Agriculture Preserve – Establishment/Dissolution /Diminishment $4,000 $4,172 $4,217 Agricultural Preserve - Notice Of Non-Renewal $150 $156 $157 Annexation $2,000 $2,086 $2,108
Appeal $1,500 $1,564 $1,581
Cannabis Land Use Permit $4,063 $4,237 $4,283
Cannabis Regulatory Permit $1,213 $1,265 $1,278
Cannabis Regulatory Permit - Annual Renewal $527 $549 $555 Change Of Zone / Text Amendment $7,000 $7,301 $7,381
Specific Plan/Amended Specific Plan $8,000 $8,344 $8,435 Conditional Use Permit $6,000 $6,258 $6,326
Development Agreement $10,000 $10,430 $10,544
Environmental Impact Report (25% of Contract Amount or XXXX, whichever is greater)
$6,668 $6,954 $7,030
Environmental Assessment (Initial Study) $1,000 $1,043 $1,054 Extension Of Time $299 $311 $314
General Plan Amendment $8,000 $8,344 $8,435
Landscape Plans (5.5% of Valuation of XXXX, whichever is greater) $530 $552 $558
Large Family Daycare $200 $208 $210
Lot Line Adjustment $200 $208 $210
Actual Cost – $10,000 initial deposit

2.5% of Engineer’s Estimate

3.0% of Engineer’s Estimate

2.5% of Engineering Estimate
Actual Cost – $2,500 initial deposit
Actual Costs
City of San Jacinto
Comprehensive User Fee Schedule
23/24 Effective 7/1/2024 Effective 7/1/2025
CPI 4.30% 1.10%
Lot Merger $200 $208 $210
Minor Change to an Approved Project $756 $788 $796
Minor Use Permit $3,955 $4,125 $4,170
Minor Variance $492 $513 $518
Planned Development Permit $4,000 $4,172 $4,217
Pre-Application $500 $521 $526
SPDR - Sign Review, Accessory Structures, Minor Facade Modifications $299 $311 $314 SPPD - Single Family Home, Sign Program $299 $311 $314
SPDR - Tract, Commercial, Industrial $1,500 $1,564 $1,581 Special Event Permit $70 $73 $73
Special Letters/Reports $70 $73 $73
Street Vendor $70 $73 $73
Substantial Conformance $756 $788 $796
Surface Mining Permit $6,800 $7,092 $7,170
Temporary Use Permit $70 $73 $73
Tentative Tract Map / Revision $8,000 $8,344 $8,435
Tentative Parcel Map $6,000 $6,258 $6,326
Variance $1,500 $1,564 $1,581
Vesting Tentative Tract Map $10,000 $10,430 $10,544
Water Quality Management Plan - Preliminary $2,902 $3,026 $3,059 Water Quality Management Plan - Final Commercial <8 acres Water Quality Management Plan - Final Industrial <5 acres Water Quality Management Plan - Final Residential <19 units Water Quality Management Plan - Final Commercial 8 to 23 acres Water Quality Management Plan - Final Industrial 5 to 18 acres Water Quality Management Plan - Final Residential 19 to 50 units Water Quality Management Plan - Final Commercial >23 acres Water Quality Management Plan - Final Industrial >18 acres Water Quality Management Plan - Final Residential >50 units Zoning Clearance / Confirmation Report $70 $73 $73
$5,161
$5,822
$8,064
$5,217
$5,886
$8,152
$5,582
$7,732
$4,949