Cities Index.
Traffic Control Plan

San Jacinto City Council
July 15, 2025

Document
Traffic Control Plan
Meeting
July 15, 2025
Body
San Jacinto City Council
Original file
1.0 MB
Text extracted from the city's file for reading and search. Open the original on sanjacintoca.iqm2.com. That file is the official record.

E. EVANS ST. E. EVANS ST. E. OLD 2ND ST. E. OLD 2ND ST. SHAVER ST.

HEWITT ST. E. EVANS ST. EL MONTE ST.

S SAN JACINTO AVE.

S IRWIN ST. E ESPLANADE AVE. E ESPLANADE AVE. ROAD AHEAD (W20-1) WORK DETOUR END (M4-8a) N (R3-2)
(R11-2) CLOSED ROAD CLOSED ROAD(W20-3) AHEAD
ROAD
WORK
AHEAD
(W20-1)
ROAD
WORK
AHEAD
(W20-1)
(M4-10R)
DETOUR
(SC3(CA))
DETOUR
(SC3(CA))
DETOUR
(M4-10L) DETOUR (SC3(CA)) DETOUR
(M4-10L)
DETOUR
(M4-10L) DETOUR
(M4-10R)
DETOUR
AHEAD
ROAD
(W20-1)
WORK
AHEAD
ROAD
(W20-1)
WORK
(M4-10R) DETOUR
(R3-4)
(R3-4)
(M4-10R) DETOUR
(R11-2)
CLOSED
ROAD
CLOSED
ROAD
(W20-3)
AHEAD
CLOSED
ROAD
(W20-3)
AHEAD
(M4-10R)
DETOUR THRU TRAFFIC ROAD CLOSED (R11-4) TO
(SC3(CA))
DETOUR (M4-10R) DETOUR
(R11-2)
CLOSED
ROAD DETOUR RESIDENTIAL (R11-2) CLOSED ROAD HEWITT ST. & EVANS ST. TEMPORARY TRAFFIC DETOUR PLAN (C2406 SJVGTF REBID) PACIFIC HYDROTECH CORP. VICINITY MAP JOB SITE PHONE NO. 811 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT CALL TOLL FREE DIGALERT IT'S THE LAW ! Tel. 951-808-9501 Fax. 951-808-9518 DESIGNED BY...... www.KBeng.net Ste. 200, Corona, CA 92879 290 Corporate Terrace Circle CITY OF SAN JACINTO 1080-HYDRO-T03-SJA HEWITT ST. & EVANS ST. TRAFFIC CONTROL DETOUR PLAN PACIFIC HYDROTECH CORPORATION N.T.S. UTILITY POLE TRAFFIC CONTROL LEGEND FLASHING ARROW BOARD WARNING DEVICE HIGH LEVEL WORK AREA OHF = OVERHEAD FIBER CONES HIGH LEVEL WARNING DEVICE SIGN (SHOWN FACING LEFT) TYPE II BARRICADE FLAGGER SIGNALIZED INTERSECTION TYPE III BARRICADE D/W = DRIVEWAY ENGINEER'S SIGNATURE DATE 07/09/25 NOTES: Working hours: 7am - 7pm Two (2 QTY) message boards to be installed for northbound and southbound traffic on Hewitt Street notifying of road closures with dates. Temporary traffic detour plan shall be for a duration of five (5) weekdays from July 28th through August 1st. - INDIVIDUALS WHO ARE KNOWLEDGEABLE IN THE PRINCIPLES OF PROPER TTC SHOULD BE ASSIGNED RESPONSIBILITY FOR SAFETY IN TTC ZONES, TO CHECK THAT ALL TTC DEVICES OF THE PROJECT ARE REASONABLY CONSISTENT WITH THE TTC PLAN AND ARE EFFECTIVE IN PROVIDING REASONABLY SAFE CONDITIONS FOR MOTORISTS, BICYCLISTS, PEDESTRIANS, AND WORKERS. - AS WORK PROGRESSES TEMPORARY TRAFFIC CONTROLS AND/OR WORKING CONDITIONS SHOULD BE MODIFIED IN ORDER TO PROVIDE REASONABLY SAFE AND EFFICIENT ROAD USER MOVEMENT AND TO PROVIDE WORKER SAFETY. THE INDIVIDUAL RESPONSIBLE FOR TTC SHOULD HAVE THE AUTHORITY TO HALT WORK UNTIL APPLICABLE OR REMEDIAL SAFETY MEASURES ARE TAKEN. - ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE REMOVED AS SOON AS PRACTICAL WHEN THEY ARE NO LONGER NEEDED. - WHEN WORK IS SUSPENDED FOR SHORT PERIODS OF TIME, TTC DEVICES THAT ARE NO LONGER APPROPRIATE SHALL BE REMOVED OR COVERED. - AUDIBLE INFORMATION DEVICES ARE TO BE USED, TO ASSIST PEDESTRIANS WITH VISUAL DISABILITIES, WHERE NEEDED. - CONTRACTOR SHALL PROVIDE FOR ACCESS TO ALL ADJACENT PROPERTIES. - CONTRACTOR SHALL COVER OR REMOVE ALL CONFLICTING SIGNS. - ALL TEMPORARY TRAFFIC CONTROL (TTC) WILL BE COMPLIANT WITH THE WATCH MANUAL 2019. GENERAL NOTES:

← All documents from this meeting