City of San Jacinto
Bid Results for Project ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE Issued on 12/22/2025
Bid Due on February 19, 2026 2:00 PM (PST)
Exported on 02/19/2026
Line Totals (Unit Price * Quantity)
Granite Construction
Company
Granite Construction
Company
Universal Construction
and Engineering
Universal Construction
and Engineering Mamco Inc Mamco Inc
Riverside Construction
Company, Inc.

Riverside Construction
Company, Inc. Vance Corporation Vance Corporation All American Asphalt All American Asphalt Item Num Section Item Code Description Unit of Measure Quantity Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total 1 BASE BID SCHEDULE 1 Mobilization LS 1 $375,000.00 $375,000.00 $516,800.00 $516,800.00 $380,977.90 $380,977.90 $420,000.00 $420,000.00 $682,000.00 $682,000.00 $425,000.00 $425,000.00 2 BASE BID SCHEDULE 2 Traffic Control LS 1 $69,735.00 $69,735.00 $184,955.80 $184,955.80 $110,000.00 $110,000.00 $300,000.00 $300,000.00 $218,501.00 $218,501.00 $430,000.00 $430,000.00 3 BASE BID SCHEDULE 3 Water Pollution Control LS 1 $15,000.00 $15,000.00 $27,040.00 $27,040.00 $50,000.00 $50,000.00 $80,000.00 $80,000.00 $39,555.00 $39,555.00 $10,000.00 $10,000.00 4 BASE BID SCHEDULE 4 Clearing & Grubbing LS 1 $190,000.00 $190,000.00 $58,978.85 $58,978.85 $35,000.00 $35,000.00 $200,000.00 $200,000.00 $14,049.00 $14,049.00 $10,000.00 $10,000.00 5 BASE BID SCHEDULE 5 Saw Cut LF 11781 $4.00 $47,124.00 $2.00 $23,562.00 $2.50 $29,452.50 $4.00 $47,124.00 $3.50 $41,233.50 $3.15 $37,110.15 6 BASE BID SCHEDULE 6 Remove & Dispose Existing Pavement and Base CY 13338 $27.00 $360,126.00 $34.25 $456,826.50 $31.50 $420,147.00 $35.00 $466,830.00 $14.00 $186,732.00 $45.00 $600,210.00 7 BASE BID SCHEDULE 7 Remove & Dispose Existing AC Berm LF 1074 $6.50 $6,981.00 $12.80 $13,747.20 $10.00 $10,740.00 $9.00 $9,666.00 $10.00 $10,740.00 $2.00 $2,148.00 8 BASE BID SCHEDULE 8 Remove & Dispose Existing 18" CMP LF 170 $45.00 $7,650.00 $40.00 $6,800.00 $37.00 $6,290.00 $40.00 $6,800.00 $32.00 $5,440.00 $30.00 $5,100.00 9 BASE BID SCHEDULE 9 Remove & Dispose Existing 12" CMP LF 40 $45.00 $1,800.00 $40.00 $1,600.00 $37.00 $1,480.00 $60.00 $2,400.00 $68.00 $2,720.00 $60.00 $2,400.00 10 BASE BID SCHEDULE 10 Remove & Dispose Existing Headwalls per Construction Note #4 EA 4 $2,000.00 $8,000.00 $1,500.00 $6,000.00 $2,500.00 $10,000.00 $2,500.00 $10,000.00 $1,252.00 $5,008.00 $2,700.00 $10,800.00 11 BASE BID SCHEDULE 11 Remove & Dispose Existing Reflector Delineators LS 1 $600.00 $600.00 $4,500.00 $4,500.00 $1,000.00 $1,000.00 $500.00 $500.00 $999.00 $999.00 $500.00 $500.00 12 BASE BID SCHEDULE 12 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.00 $0.00 $0.00 $0.00 $0.00 $0.00 13 BASE BID SCHEDULE 13 Remove & Dispose Existing Guard Rail LF 40 $96.00 $3,840.00 $129.25 $5,170.00 $100.00 $4,000.00 $96.00 $3,840.00 $117.00 $4,680.00 $100.00 $4,000.00 14 BASE BID SCHEDULE 14 Relocate Existing Fencing and Gates LF 468 $96.00 $44,928.00 $84.50 $39,546.00 $82.00 $38,376.00 $96.00 $44,928.00 $59.00 $27,612.00 $100.00 $46,800.00 15 BASE BID SCHEDULE 15 Relocate Existing Mailbox EA 1 $1,500.00 $1,500.00 $500.00 $500.00 $500.00 $500.00 $965.00 $965.00 $377.00 $377.00 $500.00 $500.00 16 BASE BID SCHEDULE 16 Remove & Dispose Existing Frontier Pole EA 1 $2,100.00 $2,100.00 $1,590.45 $1,590.45 $4,500.00 $4,500.00 $2,500.00 $2,500.00 $5,260.00 $5,260.00 $2,500.00 $2,500.00 17 BASE BID SCHEDULE 17 Cold Mill 0.12' Asphalt Concrete SF 78358 $1.00 $78,358.00 $0.39 $30,559.62 $0.45 $35,261.10 $0.40 $31,343.20 $0.44 $34,477.52 $0.30 $23,507.40 18 BASE BID SCHEDULE 18 Asphalt Concrete TON 10504 $125.00 $1,313,000.00 $117.52 $1,234,430.08 $120.00 $1,260,480.00 $99.50 $1,045,148.00 $123.00 $1,291,992.00 $108.00 $1,134,432.00 19 BASE BID SCHEDULE 19 Class 2 Aggregate Base TON 24619 $26.00 $640,094.00 $26.25 $646,248.75 $42.00 $1,033,998.00 $40.00 $984,760.00 $21.00 $516,999.00 $20.00 $492,380.00 20 BASE BID SCHEDULE 20 Remove and Salvage Signage EA 9 $50.00 $450.00 $330.50 $2,974.50 $400.00 $3,600.00 $150.00 $1,350.00 $111.00 $999.00 $150.00 $1,350.00 21 BASE BID SCHEDULE 21 Construct Sidewalk per County of Riverside Std 401 SF 40078 $12.00 $480,936.00 $9.25 $370,721.50 $7.25 $290,565.50 $9.00 $360,702.00 $7.95 $318,620.10 $6.25 $250,487.50 22 BASE BID SCHEDULE 22 Construct Type "A-8" Curb & Gutter per County of Riverside Std 201 LF 7237 $47.00 $340,139.00 $39.50 $285,861.50 $31.00 $224,347.00 $30.00 $217,110.00 $40.00 $289,480.00 $33.00 $238,821.00 23 BASE BID SCHEDULE 23 Construct Residential Driveway per County of Riverside Std 207 EA 5 $2,500.00 $12,500.00 $2,754.95 $13,774.75 $4,000.00 $20,000.00 $6,200.00 $31,000.00 $7,601.00 $38,005.00 $6,600.00 $33,000.00 24 BASE BID SCHEDULE 24 Construct Access Ramp per ADA & County of Riverside Std 403 EA 5 $7,700.00 $38,500.00 $7,046.95 $35,234.75 $8,000.00 $40,000.00 $10,500.00 $52,500.00 $7,601.00 $38,005.00 $10,500.00 $52,500.00 25 BASE BID SCHEDULE 25 Potholing (Exploratory Excavations) LS 1 $38,000.00 $38,000.00 $55,500.00 $55,500.00 $20,000.00 $20,000.00 $85,000.00 $85,000.00 $16,038.00 $16,038.00 $18,000.00 $18,000.00 26 BASE BID SCHEDULE 26 Construct Commercial Driveway per County of Riverside Std 207A EA 2 $25,000.00 $50,000.00 $23,290.00 $46,580.00 $16,000.00 $32,000.00 $16,000.00 $32,000.00 $20,479.00 $40,958.00 $23,000.00 $46,000.00 27 BASE BID SCHEDULE 27 Over Excavation and Subgrade Preparation CY 15566 $5.50 $85,613.00 $8.40 $130,754.40 $30.00 $466,980.00 $9.32 $145,075.12 $7.08 $110,207.28 $14.50 $225,707.00 28 BASE BID SCHEDULE 28 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.00 $0.00 $0.00 $0.00 $0.00 $0.00 29 BASE BID SCHEDULE 29 Construct Monitoring Well per Sheet No. W-1 LS 1 $30,000.00 $30,000.00 $48,339.50 $48,339.50 $74,800.00 $74,800.00 $85,000.00 $85,000.00 $94,511.00 $94,511.00 $95,000.00 $95,000.00 30 BASE BID SCHEDULE 30 Construct Single Headwalls per Caltrans Std D89A EA 7 $7,800.00 $54,600.00 $8,125.00 $56,875.00 $8,000.00 $56,000.00 $15,000.00 $105,000.00 $12,951.00 $90,657.00 $11,500.00 $80,500.00 31 BASE BID SCHEDULE 31 Construct Concrete Collar per RCFC & WD Std M803 EA 1 $2,500.00 $2,500.00 $2,065.00 $2,065.00 $2,000.00 $2,000.00 $1,600.00 $1,600.00 $2,472.00 $2,472.00 $2,200.00 $2,200.00 32 BASE BID SCHEDULE 32 Channel Excavation CY 9125 $27.00 $246,375.00 $27.80 $253,675.00 $32.00 $292,000.00 $14.00 $127,750.00 $26.00 $237,250.00 $78.00 $711,750.00 33 BASE BID SCHEDULE 33 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 34 BASE BID SCHEDULE 34 Construct Junction Structure No. 8 Per RCFC Std JS233 EA 8 $15,000.00 $120,000.00 $5,740.00 $45,920.00 $6,000.00 $48,000.00 $15,000.00 $120,000.00 $11,930.00 $95,440.00 $14,000.00 $112,000.00 35 BASE BID SCHEDULE 35 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 36 BASE BID SCHEDULE 36 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 37 BASE BID SCHEDULE 37 Construct Manhole No. 1 per RCFC & WCD STD MH251 EA 9 $9,200.00 $82,800.00 $10,730.00 $96,570.00 $10,500.00 $94,500.00 $10,500.00 $94,500.00 $16,813.00 $151,317.00 $15,000.00 $135,000.00 38 BASE BID SCHEDULE 38 Construct 42" OD Steel Pipe Casing EMWD STD. B-575 LF 60 $550.00 $33,000.00 $1,376.00 $82,560.00 $740.00 $44,400.00 $550.00 $33,000.00 $2,178.00 $130,680.00 $1,940.00 $116,400.00 39 BASE BID SCHEDULE 39 Construct 4' Wide Curb Inlet Catch Basin per County of Riverside Std 300 EA 11 $6,500.00 $71,500.00 $6,508.00 $71,588.00 $4,800.00 $52,800.00 $10,000.00 $110,000.00 $11,397.00 $125,367.00 $10,000.00 $110,000.00 40 BASE BID SCHEDULE 40 Construct Depression for Curb Opening Catch Basin, Case C, per County of Riverside Std 311 SF 1584 $25.00 $39,600.00 $18.00 $28,512.00 $9.00 $14,256.00 $20.00 $31,680.00 $20.00 $31,680.00 $18.00 $28,512.00 41 BASE BID SCHEDULE 41 Construct 12" RCP LF 396 $210.00 $83,160.00 $305.00 $120,780.00 $240.00 $95,040.00 $250.00 $99,000.00 $644.00 $255,024.00 $500.00 $198,000.00 42 BASE BID SCHEDULE 42 Construct 18" RCP LF 745 $310.00 $230,950.00 $180.00 $134,100.00 $203.00 $151,235.00 $320.00 $238,400.00 $413.00 $307,685.00 $300.00 $223,500.00 43 BASE BID SCHEDULE 43 Construct 30" RCP LF 2123 $400.00 $849,200.00 $380.00 $806,740.00 $335.00 $711,205.00 $335.00 $711,205.00 $527.00 $1,118,821.00 $425.00 $902,275.00 44 BASE BID SCHEDULE 44 Install Rip-Rap TON 10726 $65.00 $697,190.00 $63.25 $678,419.50 $82.00 $879,532.00 $80.00 $858,080.00 $80.00 $858,080.00 $90.00 $965,340.00 45 BASE BID SCHEDULE 45 Type 1 Slurry Seal SY 5697 $4.00 $22,788.00 $3.30 $18,800.10 $5.00 $28,485.00 $3.00 $17,091.00 $4.68 $26,661.96 $4.80 $27,345.60 46 BASE BID SCHEDULE 46 Crack Seal LS 1 $12,500.00 $12,500.00 $10,450.00 $10,450.00 $9,300.00 $9,300.00 $9,500.00 $9,500.00 $7,444.00 $7,444.00 $8,500.00 $8,500.00 47 BASE BID SCHEDULE 47 Construct Modified Dual-Pipe Junction Structure Per RCFC STD JS233 LS 1 $11,000.00 $11,000.00 $6,128.00 $6,128.00 $8,000.00 $8,000.00 $25,000.00 $25,000.00 $28,256.00 $28,256.00 $25,000.00 $25,000.00 48 BASE BID SCHEDULE 48 Install TUMF Sign per Specifications LS 1 $2,000.00 $2,000.00 $1,400.00 $1,400.00 $3,500.00 $3,500.00 $2,500.00 $2,500.00 $1,756.00 $1,756.00 $3,500.00 $3,500.00 49 BASE BID SCHEDULE 49 Install Traffic Signal at Warren & Esplanade Ave LS 1 $488,921.00 $488,921.00 $499,935.00 $499,935.00 $544,000.00 $544,000.00 $450,000.00 $450,000.00 $561,741.00 $561,741.00 $470,000.00 $470,000.00 50 BASE BID SCHEDULE 50 Install Traffic Signal at Cawston & Esplanade Ave LS 1 $447,100.00 $447,100.00 $473,685.00 $473,685.00 $497,000.00 $497,000.00 $430,000.00 $430,000.00 $504,397.00 $504,397.00 $450,000.00 $450,000.00 51 BASE BID SCHEDULE 51 Signing, Striping, and Pavement Markings LS 1 $75,000.00 $75,000.00 $71,497.80 $71,497.80 $75,000.00 $75,000.00 $65,000.00 $65,000.00 $66,471.00 $66,471.00 $70,000.00 $70,000.00 Subtotal $7,812,158.00 $7,708,296.55 $8,210,748.00 $8,195,847.32 $8,636,398.36 $8,838,075.65 52 EMWD ADDITIVE ALT 1A Adjust to Grade Existing EMWD Manholes EA 7 $2,325.00 $16,275.00 $32,000.00 $224,000.00 $5,000.00 $35,000.00 $3,300.00 $23,100.00 $1,423.00 $9,961.00 $1,785.00 $12,495.00 53 EMWD ADDITIVE ALT 2A Adjust to Grade Existing EMWD Water Valve Covers EA 11 $1,325.00 $14,575.00 $2,400.00 $26,400.00 $1,000.00 $11,000.00 $2,500.00 $27,500.00 $467.00 $5,137.00 $1,150.00 $12,650.00 54 EMWD ADDITIVE ALT 3A Relocate Existing EMWD Marker Post EA 30 $220.00 $6,600.00 $225.00 $6,750.00 $500.00 $15,000.00 $230.00 $6,900.00 $118.00 $3,540.00 $50.00 $1,500.00 55 EMWD ADDITIVE ALT 4A Relocate Existing EMWD Pedestal EA 1 $5,000.00 $5,000.00 $10,250.00 $10,250.00 $9,000.00 $9,000.00 $925.00 $925.00 $17,294.00 $17,294.00 $15,000.00 $15,000.00 56 EMWD ADDITIVE ALT 5A Relocate Existing EMWD Air Vac EA 3 $8,000.00 $24,000.00 $8,790.00 $26,370.00 $4,500.00 $13,500.00 $10,000.00 $30,000.00 $8,713.00 $26,139.00 $7,750.00 $23,250.00 57 EMWD ADDITIVE ALT 6A Relocate Existing EMWD Test Station EA 24 $4,500.00 $108,000.00 $3,200.00 $76,800.00 $5,800.00 $139,200.00 $7,700.00 $184,800.00 $3,708.00 $88,992.00 $3,300.00 $79,200.00 58 EMWD ADDITIVE ALT 7A Relocate Existing EMWD Blow Off EA 1 $7,100.00 $7,100.00 $6,000.00 $6,000.00 $4,500.00 $4,500.00 $13,200.00 $13,200.00 $8,653.00 $8,653.00 $7,700.00 $7,700.00 59 EMWD ADDITIVE ALT 8A Relocate Existing EMWD Water Valve EA 1 $3,000.00 $3,000.00 $13,000.00 $13,000.00 $3,000.00 $3,000.00 $6,200.00 $6,200.00 $24,487.00 $24,487.00 $22,000.00 $22,000.00 60 EMWD ADDITIVE ALT 9A Relocate Existing EMWD Fire Hydrant EA 2 $5,500.00 $11,000.00 $9,417.00 $18,834.00 $4,500.00 $9,000.00 $14,100.00 $28,200.00 $9,844.00 $19,688.00 $8,750.00 $17,500.00 61 EMWD ADDITIVE ALT 10A Relocate Existing EMWD Water Meter EA 2 $7,200.00 $14,400.00 $3,762.00 $7,524.00 $7,700.00 $15,400.00 $4,000.00 $8,000.00 $10,908.00 $21,816.00 $9,700.00 $19,400.00 62 EMWD ADDITIVE ALT 11A Relocate Existing EMWD Backflow EA 1 $4,700.00 $4,700.00 $3,100.00 $3,100.00 $4,500.00 $4,500.00 $10,000.00 $10,000.00 $9,844.00 $9,844.00 $8,750.00 $8,750.00 63 EMWD ADDITIVE ALT 12A Adjust to Grade Existing EMWD Test Station EA 15 $3,800.00 $57,000.00 $700.00 $10,500.00 $1,000.00 $15,000.00 $850.00 $12,750.00 $1,756.00 $26,340.00 $835.00 $12,525.00 Subtotal $271,650.00 $429,528.00 $274,100.00 $351,575.00 $261,891.00 $231,970.00 Total $8,083,808.00 $8,137,824.55 $8,484,848.00 $8,547,422.32 $8,898,289.36 $9,070,045.65 City of San Jacinto
Bid Results for Project ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE Issued on 12/22/2025
Bid Due on February 19, 2026 2:00 PM (PST)
Exported on 02/19/2026
Section/Bidder Bid Amount Responsive

BASE BID SCHEDULE
Universal Construction and Engineering $7,708,296.55
Granite Construction Company $7,812,158.00
Riverside Construction Company, Inc. $8,195,847.32
Mamco Inc $8,210,748.00
Vance Corporation $8,636,398.36
All American Asphalt $8,838,075.65

EMWD ADDITIVE ALTERNATE BID SCHEDULE
All American Asphalt $231,970.00
Vance Corporation $261,891.00
Granite Construction Company $271,650.00
Mamco Inc $274,100.00
Riverside Construction Company, Inc. $351,575.00
Universal Construction and Engineering $429,528.00