1814917 - Esplanade Ave Widening Phase 1 #013-Traffic Control Plans Submittal item detail
#013-0: Traffic Control Plans
Status Created on Ball in court due date
Open
Submitted
Mar 26, 2026
ID 13
Ball in court Thomas Krumbach (Granite Construction)
Manager Thomas Krumbach (Granite Construction)
Responsible contractor Anthony Padilla (Granite Construction) Watchers Anthony Padilla (Granite Construction)
Hector Ornelas (Granite Construction)
Nevaeh Araujo (Granite Construction)
Thomas Krumbach (Granite Construction)
Spec section 01 55 26 Traffic Control Systems
Spec sub section
Type Shop Drawings
Description Please see attached submittal package for the construction Traffic Control Plans. This submittal package corresponds to spec 01 55 26 Traffic Control System.

Final Response
Final Response
Attachments
Final Response
Comments
Package
Created by Thomas Krumbach with Autodesk® Forma™ on Mar 26, 2026 at 3:54 PM PDT Page 1 of 2 1814917 - Esplanade Ave Widening Phase 1 #013-Traffic Control Plans Ball in court Sent Due Returned Response/Action Attachments Submitted
Anthony Padilla
(Granite Construction)
Submitted by Thomas
Krumbach
Mar 26, 2026 Apr 23, 2026 Mar 26, 2026 Submitted
01 55 26.pdf
TCP_Esplande Ave
Widening
Project_Rev03.pdf
Comments -
Sent for review
Thomas Krumbach
(Granite Construction) Mar 26, 2026 - - Sent for review Comments -
Created by Thomas Krumbach with Autodesk® Forma™ on Mar 26, 2026 at 3:54 PM PDT Page 2 of 2 ESPLANADE AVENUE WIDENING PHASE 1

WARREN ROAD TO SANDERSON AVENUE
TS-4 TECHNICAL SPECIFICATIONS
01 55 26 – TRAFFIC CONTROL SYSTEM
(BID ITEM No. 2)
This section covers the requirements for Bid Item No. 2 “Traffic Control.” Traffic control shall conform to the provisions in Section 5-137B “Load Limits”, Section 7, “Legal Relations and Responsibility to the Public”, Section 12, “Temporary Traffic Control” of the Caltrans Specifications, the Manual on Uniform Traffic Control Devices (MUTCD), the Section of these contract documents entitled “Insurance – Hold Harmless”, and these special provisions. Nothing in these Special Provisions shall be construed as relieving the Contractor from the responsibilities specified in Section 7-1.05.

A minimum of two (2) weeks prior to start of work, the Contractor shall submit traffic control and detour plans signed and stamped by a Licensed Traffic Engineer to the City Engineer for review for compliance with MUTCD. The Notice to Proceed will not be issued until a satisfactory Traffic Control Plan is approved by the City Engineer. Any revisions to the traffic control plans or requirements shall be approved by the City Engineer.

The access to each property shall not be restricted during normal business hours (8:00 AM to 5:00 PM, Monday through Friday). If access to a property needs to be restricted during normal business hours, access shall not be restricted for any longer than one hour and contractor must provide a minimum five day written notice. Vehicular and pedestrian access to adjacent properties shall be provided at all times. Closed sidewalks shall be posted with “SIDEWALK CLOSED” signs at each approach to the closure and an approved alternate route provided. All travel lanes, sidewalks, and crosswalks shall be open between 5:00 am and 8:30 am and between 3:30 pm and 9:00 pm. One travel lane in each direction shall be open at all times between 8:30 am and 3:30 pm. Flaggers may be used if one lane in each direction cannot be kept open with the approval of the Traffic engineer. All traffic lanes shall be open before and after work hours. A minimum of 11-foot lane, in each direction, with an even driving surface shall be available at all times.

The City would consider road closures to through traffic if requested by the Contractor. If the Contractor anticipates the need for a full road closure, Contractor would be responsible for submitting traffic control plans that clearly depict the details of the road closure and detour routes.

If the Engineer deems a full road closure is necessary or beneficial, the Engineer’s office would present the Contractor’s proposed road closure to the City Council for approval.

All existing traffic control signs and street name signs shall be maintained in visible locations except as directed by the Engineer and where they conflict with the project.

Flashing message boards shall be installed to advise the public of work site. Flashing arrow boards are mandatory for lane closures on major streets. They shall operate until traffic control is removed. All warning lights, signs, flares, barricades (including concrete barriers), trench ESPLANADE AVENUE WIDENING PHASE 1

WARREN ROAD TO SANDERSON AVENUE
TS-5 TECHNICAL SPECIFICATIONS
plates, and other facilities for the sole convenience and direction of the public traffic or any other reason shall be furnished and maintained by the Contractor. All signs shall conform to and be placed in accordance with the current MUTCD, issued by the California Department of Transportation for construction and maintenance of work zones. Any flares, flagman, pilot cars, and any and all other traffic related items, shall be furnished by the Contractor at his expense.

All barricades shall be equipped with flashing/steady burn warning lamps at night. All cones, delineators, barricades, and “k” rail shall be reflectorized. All traffic control shall be kept in their proper position at all times, and shall be repaired, replaced, or cleaned as necessary to preserve their appearance and continuity. Any devices not part of the required traffic control or detours shall be removed from the view of the traveling public immediately.

Sufficient lighting will be required for all work performed when sufficient sunlight is not present.

No payment for extra work will be allowed for work performed as specified in Section 12-1.03 (Flagging costs) of the Caltrans Specifications. Flagging costs shall be borne entirely by the Contractor.

It is the Contractor’s responsibility to provide for the safe passage for vehicles traveling to residences and business locations within the limits of the project.

The Contractor shall provide public notification in the form of an information letter pertaining to the planned work. The letter shall be written in English and Spanish and distributed to all affected residents and businesses at least seven (7) days prior to scheduled work. The letter shall include the City’s logo and be reviewed and approved by the City Engineer prior to distribution. Minimum of 48 hours in advance of all work, Contractor shall notify all emergency services, trash pickup company, school district(s), and post office.

Temporary “No Parking” signs with effective dates shall be posted three (3) days prior to the scheduled work for a particular street. Signs shall be printed in English and Spanish. The contractor shall notify the local Police Department immediately upon posting signs.

All open trenches shall be covered with non-skid steel plates or temporary asphalt pavement before and after work hours. All open trenches shall be backfilled within 72 hours. All traffic control signs shall be either covered or removed when not required by the nature of work or if no present hazard to the motorist exists.

There shall be no asphalt grinding or excavation creating a “Lip” greater than 1.0 inch left open to traffic. When lips greater than 1.0 inch exist, the lip shall be ramped with cold patch or other approved materials. This applies to all locations, including along gutter lips, manholes, etc.

Contractor shall not work any holiday (unless approved 48 hours prior to the holiday by the City Engineer).

ESPLANADE AVENUE WIDENING PHASE 1

WARREN ROAD TO SANDERSON AVENUE
TS-6 TECHNICAL SPECIFICATIONS
Traffic control signs and materials shall be maintained at all times including after hours, weekends, and holidays.

Contractor shall also coordinate to allow and not disrupt trash pickup and mail delivery at no additional cost. The completed roadway shall not be opened to traffic until all permanent signing and striping is in place or temporary striping and signing approved by the Engineer.

Adequate notice of any lane closures shall be given to all affected parties including school, emergency services, CR&R, RTA, post office, and School District as required by other sections of these specifications.

Payment for Bid Item No. 2 “Traffic Control” shall be by Lump Sum, and shall include all costs for design, installation, modifications, and removal of traffic control over the course of the project.

Additional traffic control signs or adjustments to the signs, as determined by City, shall be done at no additional cost to the City and minimum of 2 flashing message boards shall be installed to advise the public at various work sites. The Lump Sum cost shall include cost of the traffic control and detour plans prepared by a Licensed Engineer.

END OF SECTION 01 55 26

REG I ST ERED PROFESS I ONA L ENG I NEERH U M A Y U N A Z I Z STATE OF CA L I FORN C IV I L I A TITLE PAGE ’ ’ ” ” ”’ “ ” “ ” ’ “ ” ’ “ ” GENERAL NOTES Type I Barricade Type II Barricade Type III Barricade ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE PROJECT C:\Users\S. Shees Hamid Zaidi\OneDrive - mzbinc.com\2_Operations\2.3_Design Projects\02_Californa Projects\06_D601-D700\D674_Esplanade Ave Widening Ph 1\02_CAD Files\04_CAD File and External Ref\Bashaar\CAD_----.dwg 3/19/2026 11:45 AM S. NO. DWG. NO. TITLE 01 TC-00 TITLE PAGE 02 TC-01 ESPLANADE AVE & WARREN RD INTERSECTION CLOSURE 03 TC-02 ESPLANADE AVE & WARREN RD INTERSECTION CLOSURE 04 TC-03 DETOUR PLAN 05 TC-04 EB LANES CLOSURE ON ESPLANADE AVENUE 06 TC-05 INTERSECTION CLOSURE ON ESPLANADE AVE AT CAWSTON AVE 07 TC-06 INTERSECTION CLOSURE ON ESPLANADE AVE AT CAWSTON AVE 08 TC-07 DETOUR PLAN

SHEET INDEX

REG I ST ERED

PROFESS I ONA L ENG I NEER

H U M A Y U N A Z I Z
STATE

OF CA L I FORN

C IV I L
I A
C:\Users\Razaa\OneDrive - mzbinc.com\Humayun aziz's files - 2.3_Design Projects\02_Californa Projects\06_D601-D700\D674_Esplanade Ave Widening Ph 1\02_CAD Files\04_CAD File and External Ref\Razaain\Razaain 2.dwg 3/25/2026 12:20 pm ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE PROJECT R11-2
R11-2
R11-2
R11-2
R11-2
R11-2

ESPLANADE AVENUE

WARREN ROAD WARREN ROAD

DEVONSHIRE AVENUE
3 SPRING ROAD
3 SPRING ROAD

HIDDEN SPRING ROAD
M4-10(L)
R11-4
M4-10(R)
R11-4
100'
100'
100'
W20-2
W20-3
W20-1
G20-2
100'
W20-1
G20-2
100'

HIDDEN SPRING ROAD
G20-2
W20-1
350'

DEVONSHIRE AVENUE
W20-1
G20-2
350'
G20-2
W20-1
W20-2
W20-3
W20-1
G20-2
R3-1, SC3(CA)
R3-1, SC3(CA)

ESPLANADE AVENUE & WARREN ROAD

INTERSECTION CLOSURE
SIGN LEGENDS:

R3-2
R3-2

ESPLANADE AVENUE

WARREN ROAD
500' 500'
500'

COTTONWOOD AVENUE
M4-10(L)
500'
W20-2 W20-3 W20-1
G20-2
G20-2
R11-4
R3-2
G20-2
R3-1,SC3(CA) WARREN ROAD WARREN ROAD 500' 500'
350'
W20-1
100'
W20-1

REG I ST ERED PROFESS I ONA L ENG I NEERH U M A Y U N A Z I Z

STATE OF CA L I FORN C IV I L I A
C:\Users\Razaa\OneDrive - mzbinc.com\Humayun aziz's files - 2.3_Design Projects\02_Californa Projects\06_D601-D700\D674_Esplanade Ave Widening Ph 1\02_CAD Files\04_CAD File and External Ref\Razaain\Razaain 2.dwg 3/25/2026 12:20 pm ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE PROJECT ESPLANADE AVENUE & WARREN ROAD INTERSECTION CLOSURE SIGN LEGENDS:
350' 350' 350'

ESPLANADE AVENUE
W20-2 W20-3 W20-1
G20-2
100'
W20-1
G20-2
350'
W20-1
G20-2

CAWSTON AVENUE
R3-2, SC3(CA)
R3-1, SC3(CA)
R11-4
10' MIN
10' MIN
R3-5(R)
W8-23
W8-23 W8-23
100'
W20-1
G20-2

CINNABAR AVENUE
100'

ALABASTER DRIVE
W20-1
G20-2
R9-11(L) M4-10(L)

CAWSTON AVENUE
W8-23
R11-2, R3-5(L) W1-6(R)
W1-6(R)

ESPLANADE AVENUE

REG I ST ERED PROFESS I ONA L ENG I NEERH U M A Y U N A Z I Z

STATE OF CA L I FORN C IV I L I A
R11-2
R11-2
R11-2
R11-4
M4-10(R)
M4-10(L)
R11-4
R11-4
M4-10(L)
R11-4
M4-10(L)
M4-10(L)
SC3(CA) SC3(CA) M4-10(L)
SC3(CA) SC3(CA) SC3(CA) SC3(CA) M4-10(L)SC3(CA)
SC3(CA) SC3(CA) SC3(CA) M4-10(R) M4-10(R) SC3(CA) SC3(CA) SIGN LEGENDS:

SC3(CA), R3-1
M4-10(L)
M4-10(R)
SC3(CA)
ESPLANADE AVENUE WIDENING PHASE 1 WARREN

ROAD TO SANDERSON AVENUE PROJECT

DETOUR PLAN
SC3(CA)
SC3(CA)
SC3(CA)
M4-10(R)
SC3(CA)
SC3(CA)
M4-10(L)
M4-10(L)
R11-2
STOP
STOP
STOP
STOP
STOP
STOP
STOP

STOPSTOPSTOP
STOP

REG I ST ERED

PROFESS I ONA L ENG I NEER

H U M A Y U N A Z I Z
STATE

OF CA L I FORN

C IV I L
I A
SIGN LEGENDS:

C:\Users\S. Shees Hamid Zaidi\OneDrive - mzbinc.com\2_Operations\2.3_Design Projects\02_Californa Projects\06_D601-D700\D674_Esplanade Ave Widening Ph 1\02_CAD Files\04_CAD File and External Ref\Razaain\RAZAAIN.dwg 3/10/2026 3:29 PM

CINNABAR AVENUE

ESPLANADE AVENUE

ESPLANADE AVENUE

ESPLANADE AVENUE
100' 100'
500'
500'
G20-2
W20-1
G20-2
W20-1

WARREN ROAD

WARREN ROAD
W20-1 W1-4(L)
G20-2
W1-4(L)
100'
W20-1
G20-2
100'
W20-1
G20-2
350'
W20-1
G20-2 W20-1
G20-2

CAWSTON AVENUE

CAWSTON AVENUE
350'
11' MIN
11' MIN 11' MIN
11' MIN
C30(CA) R4-8a
11' MIN
11' MIN

ALABASTER DRIVE
C30(CA) R4-8a
R4-7a R4-7a
C30(CA)
C30(CA) C30(CA) C30(CA) W1-4(R)

ESPLANADE AVENUE
R9-11(L)
R9-11(R)
350' 350'
W1-4(R) W20-1
G20-2
R4-7a R4-7a
R4-7a
C30(CA)
R9-9
C30(CA)
R4-7
ESPLANADE AVENUE WIDENING PHASE 1 WARREN

ROAD TO SANDERSON AVENUE PROJECT

EB LANES CLOSURE ON ESPLANADE
AVENUE
11' MIN
11' MIN
C30(CA) R4-8

REG I ST ERED PROFESS I ONA L ENG I NEERH U M A Y U N A Z I Z

STATE OF CA L I FORN C IV I L I A
SIGN LEGENDS:

R11-2
R11-2
R11-2
R11-2
R11-4
M4-10(L)
R11-4
M4-10(R)
R11-4
M4-10(R)

CAWSTON AVENUE

CAWSTON AVENUE

WARREN RD

MENLO AVENUE
250'
G20-2
250'
W20-1 W20-2 W20-3
350' 350'
G20-2
W20-1 W20-3 W20-2
100'
G20-2
W20-1
100'
G20-2
W20-1
500'
G20-2
W20-1
100'
G20-2
W20-1
500'
W20-1
G20-2
R3-2
R3-1
R3-2
R3-1
R3-1

INTERSECTION CLOSURE ON ESPLANADE

AVE AT CAWSTON AVE

ESPLANADE AVENUE ESPLANADE AVENUE
100'
W20-1
G20-2
R3-2
S
S
S

COTTONWOOD AVENUE
WORK HOURS:

NOTES:

1. CLOSED TO THROUGH TRAFFIC;RESIDENCE ACCESS TO BE MAINTAINED

AT ALL TIMES

2. CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TO START OF WORK.

PERMANENT CLOSURE
VERT. SCALE:

WORK HOURS:

NOTES:

1. CLOSED TO THROUGH TRAFFIC; RESIDENT ACCESS TO BE MAINTAINED AT ALL TIME

2. CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TO START OF WORK. REG I ST ERED PROFESS I ONA L ENG I NEERH U M A Y U N A Z I Z

STATE OF CA L I FORN C IV I L I A

PERMANENT CLOSURE
SIGN LEGENDS:

C:\Users\S. Shees Hamid Zaidi\OneDrive - mzbinc.com\2_Operations\2.3_Design Projects\02_Californa Projects\06_D601-D700\D674_Esplanade Ave Widening Ph 1\02_CAD Files\04_CAD File and External Ref\Bashaar\CAD_----.dwg 3/19/2026 11:45 AM R11-2
R11-4
W20-2 W20-3 W20-1
350' 350'
G20-2
350'
W20-1 R3-1
G20-2
350'
W20-1 R3-2
G20-2
M4-10(R)
M4-10(L)

W ESPLANADE AVE

W ESPLANADE AVE

SSANDERSON AVE
ESPLANADE AVENUE WIDENING PHASE 1
WARREN

ROAD TO SANDERSON AVENUE PROJECT
R11-2
R11-2
R5-1
R11-2

INTERSECTION CLOSURE ON ESPLANADE

AVE AT CAWSTON AVE

REG I ST ERED PROFESS I ONA L ENG I NEERH U M A Y U N A Z I Z

STATE OF CA L I FORN C IV I L I A DETOUR PLAN
R11-4
M4-10(R) R11-4
M4-10(L)
M4-10(L)
R11-4
M4-10(R)
M4-8a
M4-10(L)
SC3(CA) M4-10(L)
M4-10(L)
M4-10(R)
M4-8a
M4-10(L) SC3(CA)
SC3(CA)
DETOUR PLAN FOR TC-05 & TC-06
R11-2
R11-2
R11-2
R11-2
R11-2
R11-2
M4-10(L)
SC3(CA) SC3(CA) SC3(CA) SC3(CA) M4-10(L)
SC3(CA)
R11-4
M4-10(R)
SC3(CA)
M4-10(R)
WORK HOURS:

NOTES:

1. CLOSED TO THROUGH TRAFFIC;RESIDENCE ACCESS TO BE MAINTAINED

AT ALL TIMES

2. CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TO START OF WORK.

PERMANENT CLOSURE
SIGN LEGENDS:

SC3(CA) SC3(CA) SC3(CA)