EXECUTION COPY
3643403.6 042907 CTR

APPENDICES
to the

AMENDED AND RESTATED DESIGN-BUILD CONTRACT

FOR THE DIGESTED SLUDGE DEWATERING FACILITY
(CPMS NO. 7758)
AT THE
SAN JOSE – SANTA CLARA

REGIONAL WASTEWATER FACILITY
between

THE CITY OF SAN JOSE, CALIFORNIA,
as administering agency of
The Regional Wastewater Facility
and

WALSH CONSTRUCTION COMPANY II, LLC
Dated
______________, 2022
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A-i
3643403.6 042907 CTR

TABLE OF CONTENTS
Page
APPENDIX 1 DIGESTED SLUDGE DEWATERING FACILITY, DIGESTED SLUDGE

DEWATERING FACILITY SITE AND RELATED PROJECTS
DESCRIPTION ........................................................................................... 1-1

1.1 PURPOSE .................................................................................................. 1-1

1.2 BACKGROUND .......................................................................................... 1-1

1.3 DIGESTED SLUDGE DEWATERING FACILITY SITE .................................... 1-6

1.3.1 Construction Enabling Site .......................................................... 1-6

1.3.2 Environmentally Sensitive Areas................................................... 1-6

1.4 PROPOSED DIGESTED SLUDGE DEWATERING FACILITY ......................... 1-8

1.4.1 Indicative Design and Design Development during Preliminary Services. ...................................................................................... 1-8

1.5 RELATED PROJECTS AND BACKGROUND STUDIES AND
INFORMATION ......................................................................................... 1-14

1.5.1 Related Projects. ........................................................................ 1-14

1.5.2 Background Studies and Information. ........................................ 1-15

1.5.3 Field Investigation. ..................................................................... 1-16

1.6 DEWATERING FACILITY SITE ACCESS AND SECURITY ........................... 1-17 APPENDIX 2 PRELIMINARY SERVICES ............................................................................... 2-1

2.1 PRELIMINARY SERVICES TASK #1 – PROJECT MANAGEMENT .................. 2-2

2.1.1 General Project Management. ....................................................... 2-2

2.1.2 Weekly Project Management Meetings and Technical
Workshops and Meetings. ............................................................ 2-2

2.1.3 Risk Management Requirements. ................................................. 2-4

2.1.4 Change Management Requirements. ............................................. 2-6

2.1.5 Project Execution Plan. ................................................................ 2-7

2.1.6 Communication Plan. ................................................................. 2-11

2.1.7 Permits and Approvals Plan. ....................................................... 2-12

2.1.8 Preliminary Services Schedule and Design-Build Schedule. ......... 2-13

2.1.9 Document Submittal Procedures. ............................................... 2-14

2.1.10 Monthly Preliminary Services Report Requirements .................... 2-15

2.1.11 Records Management System. .................................................... 2-15

2.1.12 Computerized Maintenance Management System. ....................... 2-16

2.1.13 Kickoff Meeting & Partnering. ..................................................... 2-18

2.1.14 Constructability Reviews. ........................................................... 2-18

2.1.15 Value Engineering. ..................................................................... 2-20

2.1.16 Cost Model ................................................................................. 2-20

2.1.17 Equipment and Subcontractor Procurement ............................... 2-21

2.2 PRELIMINARY SERVICES TASK #2 – PRELIMINARY INVESTIGATIONS ..... 2-22

2.2.1 Information Review and Verification. .......................................... 2-22

2.2.2 Review of Reference Documents.................................................. 2-23

2.2.3 Site Analysis .............................................................................. 2-23

2.2.4 Existing Facilities Condition Assessments................................... 2-24

2.2.5 Subsurface Utilities Investigation ............................................... 2-25

2.2.6 Geotechnical Investigations. ....................................................... 2-26

2.2.7 Sludge characterization .............................................................. 2-32

2.2.8 Regulated Site Conditions – Hazardous Materials (Asbestos, Lead and PCBs).......................................................................... 2-37

2.2.9 Regulated Site Conditions – Soils Testing .................................... 2-39

2.2.10 Odor Modeling ........................................................................... 2-41

2.2.11 Options Analysis ........................................................................ 2-42

2.3 PRELIMINARY SERVICES TASK #3 – BASIS OF DESIGN REPORT ............ 2-44 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A-ii
3643403.6 042907 CTR

2.3.1 Basis of Design Development ...................................................... 2-44

2.3.2 Draft Basis of Design Report (BDR). ............................................ 2-46

2.3.3 Basis of Design Review Workshop. .............................................. 2-49

2.3.4 Final Basis of Design Report. ...................................................... 2-50

2.4 PRELIMINARY SERVICES TASK #4 – 30 PERCENT DESIGN
COMPLETION DOCUMENTS (DCD) .......................................................... 2-50

2.4.1 Period of Performance. ............................................................... 2-50

2.4.2 Minimum Requirements. ............................................................ 2-50

2.4.3 Criteria. ..................................................................................... 2-51

2.4.4 30 Percent Design ...................................................................... 2-51

2.4.5 Corrosion Engineering. ............................................................... 2-53

2.4.6 30 Percent Design Workshop. ..................................................... 2-54

2.4.7 Updated Estimated Design-Build Cost. ....................................... 2-55

2.4.8 Updated Initial Design-Build Schedule. ...................................... 2-55

2.4.9 City Review. ............................................................................... 2-55

2.5 PRELIMINARY SERVICES TASK #5 – 60 PERCENT DESIGN
COMPLETION DOCUMENTS (DCD) .......................................................... 2-56

2.5.1 Inclusion of the Technical Specifications. .................................... 2-56

2.5.2 60% DCD Deliverables. .............................................................. 2-56

2.5.3 Minimum Requirements. ............................................................ 2-56

2.5.4 Criteria. ..................................................................................... 2-59

2.5.5 Updated Design-Build Cost Model. ............................................. 2-59

2.5.6 Updated Design-Build Schedule. ................................................ 2-59

2.5.7 Required Permits and Approvals. ................................................ 2-60

2.5.8 Performance Guarantees. ........................................................... 2-60

2.5.9 Training Plan Requirements. ...................................................... 2-61

2.5.10 Draft Maintenance of Operations During Construction Plan. ....... 2-62

2.5.11 City Review. ............................................................................... 2-62

2.5.12 60 Percent Design Workshop. ..................................................... 2-62

2.6 PRELIMINARY SERVICES TASK #6 – DEFINITIVE PROJECT
SUBMITTAL AND SUPPORTING COST ESTIMATES .................................. 2-62

2.6.1 Definitive Project Submittal. ....................................................... 2-62

2.6.2 Basis of the Proposed Base Guaranteed Maximum Price. ............ 2-63

2.6.3 Preparation of the Definitive Project Submittal. ........................... 2-65

2.6.4 Definitive Project Submittal Workshop. ....................................... 2-66

2.7 PRELIMINARY SERVICES TASK #7 ADDITIONAL PRELIMINARY SERVICES ............................................................................................... 2-66

2.8 PRELIMINARY SERVICES FEE ................................................................. 2-67

2.8.1 Compensation for Base Preliminary Services. .............................. 2-67

2.8.2 Payment Requests ...................................................................... 2-68

2.8.3 Compensation for Additional Preliminary Services. ..................... 2-68 APPENDIX 3 GOVERNMENTAL APPROVALS ....................................................................... 3-1

3.1 PURPOSE .................................................................................................. 3-1

3.2 GOVERNMENTAL APPROVALS .................................................................. 3-1 APPENDIX 4 TECHNICAL SPECIFICATIONS ........................................................................ 4-1

4.1 PURPOSE .................................................................................................. 4-1

4.2 DESIGN GUIDANCE DOCUMENTS AND STANDARD SPECIFICATIONS....... 4-1

4.3 CODES AND REGULATIONS ...................................................................... 4-2

4.4 MAJOR PROJECT ELEMENTS ................................................................... 4-2

4.5 MINIMUM TECHNICAL REQUIREMENTS ................................................... 4-3

4.5.1 Operating Strategy ....................................................................... 4-3

4.5.2 Digested Sludge Flows, Loads, and Design Years .......................... 4-3

4.5.3 Phased Design and Construction .................................................. 4-4

4.5.4 Phased Design and Construction ................................................ 4-10

4.5.5 City Specifications and Standards .............................................. 4-11 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A-iii
3643403.6 042907 CTR

4.5.6 Environmental Mitigation Measures ........................................... 4-11

4.5.7 Other Minimum Technical Requirements .................................... 4-11

4.6 60% Definitive Project Submittal (DPS) Design Completion Documents and 60% DPS Design Comments Lists ...................................................... 4-11 APPENDIX 5 GENERAL DESIGN-BUILD WORK REQUIREMENTS ........................................ 5-1

5.1 PURPOSE .................................................................................................. 5-1

5.1.1 General Purpose .......................................................................... 5-1

5.1.2 City Standard Specifications......................................................... 5-1

5.2 MANAGEMENT AND COORDINATION ........................................................ 5-2

5.2.1 Coordination. ............................................................................... 5-2

5.2.2 Partnering Sessions. .................................................................... 5-2

5.3 DESIGN-BUILD SCHEDULE....................................................................... 5-3

5.3.1 Design-Build Schedule (Baseline Schedule). ................................. 5-3

5.3.2 Design-Build Schedule Updates (Progress Schedules). .................. 5-4

5.3.3 City Review. ................................................................................. 5-5

5.3.4 Events Affecting the Design-Build Schedule. ................................. 5-5

5.3.5 Revisions to Baseline Schedule ..................................................... 5-5

5.4 CONSTRUCTION MEETINGS AND REPORTS .............................................. 5-6

5.4.1 Preconstruction Conference. ......................................................... 5-6

5.4.2 Construction Progress Meetings - Scheduling and Attendance. ...... 5-8

5.4.3 Construction Progress Meetings - Agenda. .................................... 5-8

5.4.4 Monthly Progress Reports. ............................................................ 5-9

5.4.5 Project Records. ......................................................................... 5-11

5.5 CONSTRUCTION WORK GENERALLY ....................................................... 5-13

5.5.1 Deliverable Material. .................................................................. 5-13

5.5.2 Signs. ........................................................................................ 5-13

5.5.3 Laydown Areas and City Construction Office Space. .................... 5-14

5.5.4 Maintenance of the Dewatering Facility Site. ............................... 5-15

5.5.5 Temporary Utilities..................................................................... 5-15

5.5.6 Relocation of Existing Utilities. ................................................... 5-16

5.5.7 Noise Control. ............................................................................ 5-16

5.5.8 Notice of Default, Breach or Non-Compliance. ............................. 5-16

5.5.9 Survey and Survey Controls ....................................................... 5-16

5.6 COORDINATION OF CONSTRUCTION WORK AND OPERATIONS .............. 5-16

5.6.1 Regional Wastewater Facilities Shutdowns during
Construction. ............................................................................. 5-16

5.6.2 Maintenance of Regional Wastewater Facilities Performance during Construction. .................................................................. 5-16

5.6.3 Operations and Maintenance Records ......................................... 5-17

5.7 CONSTRUCTION SAFETY AND SECURITY. ............................................... 5-17

5.7.1 Safety and Security. ................................................................... 5-17

5.7.2 Perimeter Security...................................................................... 5-19

5.8 OPERATIONS AND MAINTENANCE MANUAL ............................................ 5-19

5.8.1 Development by the Design-Builder ............................................ 5-19

5.8.2 Content of the Operations and Maintenance Manual ................... 5-19

5.9 SERVICE MANUALS ................................................................................ 5-21

5.9.2 DCS Information and Electronic Requirements ........................... 5-22

5.10 ENVIRONMENTAL REVIEW AND PROTECTION. ....................................... 5-23

5.10.1 Existing Regulated Substances ................................................... 5-23

5.10.2 Wildlife and Protected Species Protection. ................................... 5-24

5.10.3 Design-Builder Construction Environmental Monitor. ................. 5-24

5.10.4 Regulated Substances Management Program. ............................. 5-25

5.10.5 Design-Builder Regulated Substances. ....................................... 5-26

5.10.6 Emergency/Spill Response Plan. ................................................ 5-26

5.10.7 Dust Control. ............................................................................. 5-26 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A-iv
3643403.6 042907 CTR

5.10.8 Traffic and Transportation Mitigation ......................................... 5-27

5.10.9 Cultural and Historic Resources ................................................. 5-27

5.11 CLOSEOUT .............................................................................................. 5-27 APPENDIX 6 DESIGN-BUILD QUALITY ASSURANCE AND QUALITY CONTROL REQUIREMENTS ....................................................................................... 6-1

6.1 PURPOSE .................................................................................................. 6-1

6.2 CITY’S QUALITY OBJECTIVES ................................................................... 6-1

6.3 ROLES AND RESPONSIBILITIES ................................................................ 6-2

6.3.1 Design-Builder's Role and Responsibilities for QA/QC. ................. 6-2

6.3.2 City's Role and Responsibilities for QA/QC. .................................. 6-2

6.4 DESIGN-BUILD QUALITY MANAGEMENT PLAN DEVELOPMENT AND IMPLEMENTATION .................................................................................... 6-3

6.4.1 General Requirements. ................................................................. 6-3

6.4.2 Design-Build Quality Management Plan Requirements. ................. 6-3

6.4.3 Changes to the Design-Build Quality Management Plan. ............... 6-4

6.5 DESIGN QUALITY CONTROL AND QUALITY ASSURANCE
REQUIREMENTS ....................................................................................... 6-4

6.5.1 Design QA/QC Program. .............................................................. 6-4

6.5.2 Design Quality Assurance Manager. ............................................. 6-5

6.6 CONSTRUCTION QUALITY CONTROL REQUIREMENTS ............................. 6-5

6.6.1 Construction QA/QC Program. ..................................................... 6-5

6.6.2 Non-Conforming Work.................................................................. 6-6

6.6.3 Construction Quality Assurance Manager. .................................... 6-7

6.6.4 Materials and Equipment. ............................................................ 6-7

6.6.5 Construction Management and Testing. ........................................ 6-8

6.6.6 Laboratories. ................................................................................ 6-9

6.7 INSPECTION OF DESIGN-BUILD WORK ..................................................... 6-9

6.7.1 Inspection and Correction. ........................................................... 6-9

6.7.2 City Access. ................................................................................. 6-9

6.7.3 Materials Inspection. .................................................................. 6-10

6.8 TIME OF INSPECTION AND TESTS .......................................................... 6-10

6.9 MATERIALS SAMPLING AND TESTING ..................................................... 6-10

6.9.1 Materials Testing and Removal. .................................................. 6-10

6.9.2 Materials Rejection. .................................................................... 6-11

6.10 MATERIALS TESTING SERVICES ............................................................. 6-11

6.10.1 Design-Builder’s Laboratories. .................................................... 6-11

6.10.2 Interruptions For Testing and Sampling. .................................... 6-11

6.10.3 Test Reports............................................................................... 6-12

6.10.4 City’s Laboratories. .................................................................... 6-12

6.10.5 Materials to be Tested. ............................................................... 6-12

6.11 INSTALLATION ........................................................................................ 6-13

6.11.1 Inspection and Measurement. .................................................... 6-13

6.11.2 Manufacturer’s Instructions. ...................................................... 6-14

6.12 PERSONNEL QUALIFICATIONS ................................................................ 6-14 APPENDIX 7 DESIGN-BUILD WORK REVIEW PROCEDURES .............................................. 7-1

7.1 OVERVIEW ................................................................................................ 7-1

7.1.1 Purpose. ...................................................................................... 7-1

7.1.2 City Standard Specifications......................................................... 7-1

7.2 DOCUMENTS TO BE SUBMITTED. ............................................................ 7-1

7.2.1 City Web-Based Design and Construction Management System ........................................................................................ 7-1

7.2.2 Documents to be Submitted ......................................................... 7-1

7.2.3 Design-Construction Work Package Information. .......................... 7-3

7.3 CITY REVIEW DURING GOVERNMENTAL APPROVAL PROCESS ................ 7-6

7.4 CITY DOCUMENT REVIEW ........................................................................ 7-6 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A-v
3643403.6 042907 CTR

7.4.1 City Review Responsibilities. ........................................................ 7-6

7.4.2 Changes to Technical Specifications. ............................................ 7-7

7.4.3 Time for City Review. .................................................................... 7-7

7.4.4 Time for Design-Builder Response. ............................................... 7-8

7.4.5 Design-Build Progress Meetings. .................................................. 7-8

7.4.6 Design Submittals During Construction. ...................................... 7-8

7.4.7 Design Change Authority. ............................................................ 7-9

7.5 CITY CONSTRUCTION REVIEWS AND INSPECTION ................................... 7-9

7.5.1 Construction Review Intent. ......................................................... 7-9

7.5.2 Construction Submittal Review. ................................................... 7-9

7.5.3 “Or Equals”. ............................................................................... 7-11

7.5.4 Named Suppliers. ....................................................................... 7-11

7.5.5 Functionally Equal. .................................................................... 7-11

7.5.6 Corrections and Changes. .......................................................... 7-12

7.6 RECORD DRAWINGS AND RECORD SPECIFICATIONS ............................ 7-12 APPENDIX 8 COST REIMBURSABLE WORK PAYMENT AND SCHEDULE OF VALUES REQUIREMENTS ....................................................................................... 8-1

8.1 PURPOSE .................................................................................................. 8-1

8.2 PAYMENT FOR COST REIMBURSABLE WORK ........................................... 8-1

8.2.1 Payment. ..................................................................................... 8-1

8.2.2 Related Definitions. ...................................................................... 8-2

8.2.3 Certification and Cost Substantiation. .......................................... 8-2

8.2.4 Relation to General Conditions Costs ............................................ 8-3

8.2.5 Discounts, Rebates and Refunds. ................................................. 8-3

8.3 COST REIMBURSABLE WORK COSTS ....................................................... 8-3

8.3.1 Third-Party Professional Services Fees. ......................................... 8-3

8.3.2 Construction Subcontractor and Major Equipment Supplier Costs. .......................................................................................... 8-4

8.3.3 Design-Builder’s Own Labor Costs. ............................................... 8-4

8.3.4 Costs of Materials, Equipment and Supplies. ................................ 8-5

8.3.5 Other Costs. ................................................................................ 8-6

8.3.6 City Travel Policy Cost Limits. ...................................................... 8-7

8.4 UNALLOWABLE COSTS ............................................................................. 8-7

8.4.1 No Payment Obligation. ................................................................ 8-7

8.4.2 Unallowable Costs Defined. .......................................................... 8-7

8.5 GENERAL CONDITIONS FEE ..................................................................... 8-9

8.6 DESIGN-BUILDER FEE ............................................................................ 8-10 APPENDIX 9 COMMISSIONING AND ACCEPTANCE ............................................................. 9-1

9.1 Introduction and Objectives ....................................................................... 9-1

9.2 Centrifuge Confirmation Testing ................................................................. 9-2

9.2.1 Minimum Testing Requirements and Centrifuge Confirmation Test Plan ..................................................................................... 9-2

9.2.2 Submittal Requirements ............................................................... 9-5

9.3 Commissioning and Acceptance Test Plan .................................................. 9-6

9.3.1 Minimum Requirements: .............................................................. 9-6

9.3.2 Required Submittals and Time Frames ....................................... 9-12

9.4 MINIMUM COMMISSIONING AND ACCEPTANCE TEST
REQUIREMENTS ..................................................................................... 9-12

9.4.1 General ...................................................................................... 9-12

9.4.2 City’s Sludge Characteristics Testing .......................................... 9-13

9.4.3 City and Design-Builder Responsibilities, Generally .................... 9-14

9.4.4 Required Tests ........................................................................... 9-15

9.4.5 Minimum Acceptance Standards and Full Acceptance
Standards .................................................................................. 9-17

9.4.6 Buydown Liquidated Damages ................................................... 9-25 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A-vi
3643403.6 042907 CTR

9.4.7 Duration of Acceptance Test ....................................................... 9-28 APPENDIX 10 [INTENTIONALLY OMITTED] ....................................................................... 10-1 APPENDIX 11 TRANSITION SERVICES .............................................................................. 11-1

11.1 PURPOSE ................................................................................................ 11-1

11.2 CITY OPERATION OF THE DEWATERING FACILITY ................................. 11-1

11.3 DESIGN-BUILDER RESPONSIBILITIES GENERALLY ................................ 11-1

11.3.1 Transition Services Standards .................................................... 11-1

11.3.2 Transition Coordinator ............................................................... 11-1

11.3.3 Additional Transition Services Personnel .................................... 11-1

11.3.4 Access to the Dewatering Facility ................................................ 11-2

11.3.5 Access to Data and Records ....................................................... 11-2

11.4 TRANSITION SERVICES ........................................................................... 11-2

11.4.1 Nature of the Transition Services ................................................ 11-2

11.4.2 Additional Transition Services .................................................... 11-3

11.5 COST AND PAYMENT RESPONSIBILITIES ................................................ 11-4

11.6 NO LIMITATION ON OTHER POST-ACCEPTANCE OBLIGATIONS .............. 11-4 APPENDIX 12 INSURANCE REQUIREMENTS .................................................................... 12-1 APPENDIX 13 KEY PERSONNEL AND APPROVED SUBCONTRACTORS ............................. 13-1

13.1 PURPOSE ................................................................................................ 13-1

13.2 KEY PERSONNEL .................................................................................... 13-1

13.3 SUBCONTRACTORS ................................................................................ 13-1

13.3.1 Required Subcontractors. ........................................................... 13-1

13.3.2 Approved Subcontractors. .......................................................... 13-1 APPENDIX 14 APPLICABLE CITY SPECIAL PROVISIONS ................................................... 14-1 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
APPENDIX 1

DEWATERING FACILITY, DEWATERING FACILITY SITE AND RELATED PROJECTS

DESCRIPTION
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
APPENDIX 1

DIGESTED SLUDGE DEWATERING FACILITY, DIGESTED SLUDGE DEWATERING

FACILITY SITE AND RELATED PROJECTS DESCRIPTION

1.1 PURPOSE
The purpose of this Appendix is to describe the proposed Digested Sludge Dewatering Facility Project (Dewatering Facility), show the location and boundaries of the Dewatering Facility Site, and identify relevant projects, studies, reports, and other documents.

1.2 BACKGROUND
The San José–Santa Clara Regional Wastewater Facility (RWF) is an advanced wastewater treatment facility jointly owned by the cities of San José and Santa Clara and operated by the City of San José’s (City) Environmental Services Department (ESD). The RWF serves eight South Bay cities and four special districts including: San José, Santa Clara, Milpitas, Cupertino Sanitary District (Cupertino), West Valley Sanitation District (Campbell, Los Gatos, Monte Sereno, and Saratoga), County Sanitation Districts 2-3 (unincorporated), and Burbank Sanitary District (unincorporated). Figure 1-1 shows the RWF site plan with the location of major treatment processes areas.

Sludge generated in the primary and secondary treatment processes is thickened and anaerobically digested. This digested sludge (DS) is then transferred to open-air, sludge stabilization lagoons for approximately three and a half years and then to the open-air drying beds for another six months. The resulting Class A biosolids product is loaded into trucks and hauled to the adjacent Newby Island Landfill for use as alternative daily cover (ADC). A process flow diagram of the current liquids and biosolids treatment operations is provided in Figure 1-

2. The Lagoons and Drying Beds are shown in Figure 1-3.

In 2008, the RWF embarked on a master planning process to rehabilitate and upgrade its facilities and explore potential process changes. The San José/Santa Clara Water Pollution Control Plant Master Plan (PMP) used an extensive community engagement process to develop overarching environmental, economic, social, and operational goals for the RWF. To support these goals, the PMP envisioned a comprehensive Biosolids Management Plan that would transition from the current open lagoons and drying bed process to an enclosed, mechanical treatment system with the resulting dewatered biosolids hauled off-site. This transition was intended to reduce the footprint of the biosolids management facilities to enable other uses of land currently occupied by sludge stabilization lagoons and drying beds, reduce odors in the surrounding community, allow the City to develop multiple and diversified biosolids end-use DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-2
3643403.6 042907 CTR
options, and create flexibility to respond to future regulations governing the beneficial use of biosolids.

The PMP was adopted by the San José City Council in November 2013 and by Santa Clara City Council in December 2013, allowing staff to begin critical infrastructure improvement at the Regional Wastewater Facility, including the related projects described in Section 1.5 (Related Projects and Background Studies and Information) of this Appendix. The Digested Sludge Dewatering Facility project is one of the major and high priority CIP projects. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-3
3643403.6 042907 CTR
Figure 1-1 RWF Site Plan – Major Treatment Processes
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-4
3643403.6 042907 CTR
In 2014, a Biosolids Transition Strategy was developed to address certain specific issues regarding implementation of the transition from the existing biosolids management system to the PMP's recommended system, taking into consideration the changes that have occurred since the technical aspects of the PMP were developed. A new mechanical DS dewatering facility is an integral component of this Biosolids Transition Strategy. The implementation of the new Digested Sludge Dewatering Facility project (Project) was approved at the June 2, 2015, City Council meeting.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-5
3643403.6 042907 CTR
Figure 1-2 Process Flow Diagram – Existing RWF Liquids and Biosolids Treatment Operations DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-6
3643403.6 042907 CTR

1.3 DIGESTED SLUDGE DEWATERING FACILITY SITE
Figure 1-3 is the RWF site plan showing the Dewatering Facility Site to the east of Zanker Road. It also shows elements of the project that will be built within the fence line of the RWF, such as the transfer pumps, DS storage and transport pump station, and pipeline corridors.

These sites and all of the sites described below comprise the Dewatering Facility Site.

1.3.1 Construction Enabling Site
The Construction Enabling Site is shown in Figure 1-4, at the bottom of the aerial photograph, labeled as “Main Storage and Laydown Area for Main Plant Work.” Additionally, a staging area for material and personnel for the Digested Sludge Storage Site is located above the triangle area shown in green. Similarly, Figure 1-5 designates the construction laydown and trailer/parking area for the main construction area for the Dewatering Facility. Additional areas may be designated by the City for construction staging, storage, trailers and laydown for the Dewatering Facility.

1.3.2 Environmentally Sensitive Areas
Figure 1-6 shows environmentally sensitive areas at the rear of the Dewatering Facility Site.

Work near this area requires setbacks per City Policy and work in this area requires a permit.

It is anticipated that these areas will be cordoned off during construction and that the Project will proceed without access to them. If work is required in this area, full environmental review will be required prior to permit applications.

There is also the potential for burrowing owls to nest or forage at all planned sites at RWF. All work in this area must be in compliance with the Santa Clara Valley Habitat Conservation Plan.

The Design-Builder shall also comply with all Environmental Mitigation Measures in accordance with Section 4.3 (Environmental Review) of this Amended and Restated DesignBuild Contract. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-7
3643403.6 042907 CTR
Figure 1-3 Existing RWF Site and Locations of Major Project Elements DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-8
3643403.6 042907 CTR

1.4 PROPOSED DIGESTED SLUDGE DEWATERING FACILITY
The new Dewatering Facility is anticipated to include new dewatering buildings that would house a mechanical DS dewatering system (i.e. centrifuges); polymer blending and dosage facilities; dewatered cake conveyance and storage facilities; truck loading bays with weighing scales; new centrate pumping systems and, a maintenance shop and various support facilities and systems. It will also include a process control room, Motor Control Center, transformers, switchgear, heating/ventilating/air conditioning systems, break room, kitchen, conference room, showers, lockers, bathrooms, and a parts storage area.

Within the fence line of the RWF, the Project includes transfer pumps and pipelines to convey DS from existing digesters to storage facilities; a new DS storage facility with necessary conveying, pumping, and tankage; new DS pumping systems and pipelines to convey DS from DS storage to the new dewatering building; pipelines to convey centrate from the dewatering process to RWF; and, various new and modified ancillary facilities and systems.

Major elements of the Project and their intended functions were initially described in the Digested Sludge Dewatering Facility Project Definition Report, prepared by Brown and Caldwell and issued on October 1, 2018. Changes were made to the preliminary concepts described in that report during the preliminary services phase of the Project. APPENDIX 4, Technical Specifications, describes the major elements of the Project, their intended function, and technical criteria and requirements.

1.4.1 Indicative Design and Design Development during Preliminary Services.

The PDR included two indicative designs. The indicative designs outlined a baseline concept and scope of the Project developed during the planning stages to assist in obtaining environmental permits and cost estimates. The indicative designs was used as guidance, but did not prescribe to the Design-Builder the final design of the Project. The Basis of Design Report (BDR) has been completed and the final design for the Project is being developed by the Design-Builder by advancing or modifying the indicative designs to incorporate the results of the Design-Builder’s preliminary investigations (e.g. condition assessments, geotechnical investigations, etc.) and to address changes made subsequent to the completion of the indicative designs.

Figures 1-4 & 1-5 present the overall site plans developed by the Design-Builder as part of the preliminary services. The design criteria include a mass balance that was derived from the Project flow and load design criteria to establish sizes and numbers of facilities and system used in the detailed design drawings.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-9
3643403.6 042907 CTR
As shown in the figures, the design includes construction of the following:
 Two-building dewatering facility
 DS transfer pumps and pipes from the existing digesters to DS storage tanks  Two concrete DS storage tanks
 DS export pump station
 DS conveyance pipelines from DS storage to the dewatering facility  New emulsion polymer system with two storage tanks, blending and metering units  DS feed pumps suitable for metering DS into centrifuges  High-solids decanter centrifuges specifically designed for dewatering DS  Dewatered cake conveyance system
 Dewatered cake storage
 Dewatered cake truck loading bays with weigh scales
 Exterior truck loadout control space at the Dewatering Cake Building  Guard Shack for truck access entrance
 Exterior dewatered cake haul vehicle wash facility
 Centrate pump station and conveyance to the Headworks effluent box. Plant drains will also be added to the centrate wetwell and pump system.
 Storm water pipelines from the dewatering facility to the (EBOS)  Exterior sanitary sewer and plant drain pump stations at the Dewatering Building  Air-gap/booster pump station for potable (WTR-1) system  Struvite management measures
 Foul-air ventilation
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-10
3643403.6 042907 CTR
During the Alternative Analysis phase of the Project (prior to Preliminary Services), the City considered several locations for the Dewatering Facility and DS storage tanks. The City selected the locations shown in Figure 1-4. In addition, the City selected high-solids decanter centrifuges specifically designed for dewatering DS as the dewatering technology for this Project.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-11
3643403.6 042907 CTR
Figure 1-4 Site Plan for Digested Sludge Storage Tank & Transport Pump Station DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-12
3643403.6 042907 CTR
Figure 1-5 Site Plan for Dewatering Building and Associated Facilities DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-13
3643403.6 042907 CTR
Figure 1-6 RWF Environmentally Sensitive Areas and CEQA Boundary

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-14
3643403.6 042907 CTR

1.5 RELATED PROJECTS AND BACKGROUND STUDIES AND INFORMATION The Dewatering Facility Project is part of the overall Capital Improvement Project (CIP) established to rebuild and revitalize the RWF. A number of studies, tasks, plans, and projects under the CIP will have bearing on the Project. The following studies, tasks, plans, and projects will interface with the Project. The list is provided for reference and shall not limit or excuse the Design-Builder’s performance of the Contract Services.

1.5.1 Related Projects.

The table below contains a list of Related Projects with which the Design-Builder will need to coordinate during the Design-Build Period. Any such coordination will be managed and as directed by the City.

Related Projects
1 Digester and Thickener Facilities Upgrade – Adjacent Construction 2 Facility Wide Water Systems Improvements - Improvements scheduled for construction May 2023 – Oct 2025.
3 Nitrification Clarifiers Rehabilitation – Access to certain dewatering construction work areas will overlap with access to areas required for the clarifier rehabilitation work. Dewatering will need to coordinate schedule and access to construction activities in DS Storage Tank area and G Street.
4 New Headworks – Certain dewatering construction work may overlap with headworks construction. Dewatering will need to coordinate access in DS Storage Tank Area and G Street. In addition, the Dewatering Project’s process piping will need to connect to process piping constructed as part of the Headworks Project for WTR3, Centrate, and Stormwater.
5 M4 Replacement by the City – Schedule coordination; confirmation of new M4 feed’s as-built condition for interconnection design and construction by Walsh.
6 Fire Life Safety – Life safety improvements currently scheduled for construction through Aug 2022 Design-Builder will be responsible for installing, connecting, and programming the new fire alarm panel in control room of Dewatering Building to the central fire alarm monitoring system. To the extent that the fire safety requirements (not yet defined) impact permanent site access and security requirements for the new Dewatering Facility, this may require a change in scope 7 Plantwide Security Update – Security update is scheduled the overlap with Dewatering construction, but specific requirements for the security update are not yet defined. To the extent that the security updates impact permanent site access and security requirements for the new Dewatering Facility, this may require a change in scope. 8 Stormwater project – Storm Drain replacement work in 5th street.

Construction on the storm drain project is scheduled to begin in February 2022. The 5th street segment is set to begin summer 2022.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-15
3643403.6 042907 CTR
Walsh’s work in 5th street will need to be coordinated with this project to avoid or minimize conflicts.

1.5.2 Background Studies and Information.

The following memoranda, studies, plans, specifications and data have been provided separately by the City to the Design-Builder as background information related to the Project.

Previous Studies and Information Provided to the Design-Builder Date Published 1 Dewaterability of a Sludge Sample WWTP San Jose (K.B. Kopp) Nov-2019 2 Dewaterability of a Sludge Sample (Mathew Higgins, Bucknell University) Oct 2019 3 Subsurface Utilities Investigation Report (Jacobs) Oct 2019 4 Geotechnical Desk Study – Facility Wide Water (Cal Engineering and Geology)
Sept 2019
5 Preliminary/Draft Geotechnical Design Report – Headworks (Jacobs) July 2019 6 Characterization of San Jose Dewaterability (Higgines, Bucknell University)
April 2019
7 Pre-Construction Hazardous Materials Assessment Cornerstone Earth Group
Aug-2019
8 Technical Memorandum No. 1 - Hazardous Materials Investigation and Remediation Protocol (Brown and Caldwell)
Mar-2019
9 Digested Sludge Dewatering Facility Project Definition Report (Brown and Caldwell)
Oct-2018
10 Technical Memorandum – Odor and Hydrogen Sulfide Impact Assessment (Brown and Caldwell)
Sep-2018
11 Technical Memorandum No. 4 – Facility and Site Civil Arrangement Alternatives Analysis (Brown and Caldwell)
Mar-2018
12 Technical Memorandum No. 3 – Conveyance, Storage and Pumping Alternatives Analysis (Brown and Caldwell)
Mar-2018
13 San Jose Envision General Plan (City of San Jose) Feb-2018 14 Digested Sludge Dewatering Facility – Mass Balance (Brown and Caldwell)
Sep-2017
15 Technical Memorandum No. 2 – Dewatering Technology Analysis (Brown and Caldwell)
Aug-2017
16 Technical Memorandum No. 1 – Flow and Loads/Preliminary Operating Strategy (Brown and Caldwell)
Jun-2017
17 RWF Flow Management Study (San José CIP Study 14) Jul-2017 18 Zanker Road Widening Figure (HMH Engineers) Aprl 2016 19 Final Flood Protection Summary Report (San José CIP Study 13) Apr-2016 20 Traffic Circulation and Impacts (Fehr Peers, San José CIP Study 12) Dec-2015 21 Automation Master Plan (Black and Veatch, San José CIP Study 04) Dec-2015 22 Odor and Corrosion Control Study (CH2M Hill, San José CIP Study 03) Aug-2015 23 Biosolids Transition Strategy Report Dec-2014
24 RWF CIP Program Flow and Loads Projection Update (RWF CIP Program Design Guidelines)
Oct-2014
25 San José/Santa Clara Water Pollution Control Plant Master Plan (City of San José)
Nov-2013
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-16
3643403.6 042907 CTR
26 Background Study Struvite Technical Memorandum 4.6 (Brown and Caldwell)
Sep-2010
27 Riparian Corridor Policy Study CSJ Mar-1999
Previous Plans, Specifications, and Record Drawings
1 Iron Salt Feed Station (CH2MHill) May-2018
2 DCS Fiber Optics Network Expansion (City of San Jose CIP) Mar-2013 3 Fuel Cell Foundation Platform and Utility Interconnections (Infrastructure Engineering Corporation
Aug-2011
4 South Bay Advanced Recycled Water Treatment Facility (Black and Veatch)
Jul-2010
5 Design Build Electrical System for Switchgear M5 (Rosendin Electric) Aug-2008 6 Digesters 12-16, Handrail Project (City of San Jose CIP) Aug-2008 7 EBOS 2005 (Carollo Engineering) Apr-2005
8 60# Brick Interceptor Replacement – Phase 1B (Brown and Caldwell) Apr 2004 9 Milpitas Parallel Force Main (Kennedy/Jenks Consultants) Mar-2000 10 Transmission Pump Station Upgrades (Black and Veatch) Feb-1999 11 400 mm (16”) Recycled Water Pipeline (Black and Veatch) Sept 1998 12 Plant Infrastructure Improvements: Digesters 12, 15, 16 Dome Rehab (Black and Veatch)
Jul-1998
13 Scum Pilot Facility and Digesters 13 and 14 Dome Rehab (Black and Veatch)
Feb-1997
14 Transmission Pump Station (CH2MHill) Mar-1996
15 M4 Auto Synchronization & Misc. Electrical Project (CH2M Hill) Jul-1994 14 Switchgear M4 Improvements Apr-1994
15 Sludge Processing Facilities (Digesters 9-16 & DSEPS) Nov-1983 16 Digesters 9-16 , DSEPS & MCC Y1, Y2 Apr-1983
17 Inter-term Improvements – Phase IIB: Electrical Substation No. 2 and Duct Banks
Sep-1982
18 Nitrification Facilities Jun-1975
19 Ammonia Dosing Station Apr-1975
20 Old Milpitas Force Main 1 Apr-1972
21 Additions - Division C - Digesters 9, 10 , 11 Oct-1970 22 Additions – Division B – Primary and Secondary Treatment Additions Oct-1970 23 North San Jose Relief Trunk Sewer - 84 Inch Pipe to Milpitas Structure Nov-1968 24 66 Inch Plant Influent Sewer May-1958
Plant Performance Data
1 RWF 2017 Annual Self-Monitoring Report Feb-2018

1.5.3 Field Investigation.

The following memoranda, studies, plans, specifications, and data have been developed by the Design-Builder during Preliminary Services.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 1
Dewatering Facility at the San Jose- Dewatering Facility, Dewatering Facility Site and Santa Clara Regional Wastewater Facility Related Projects Description A1-17
3643403.6 042907 CTR
Field Investigations
1 Hazardous Materials Sampling and Analysis Report Aug - 2020 2 Underground Utility Investigation Plan June - 2020
3 Utility Investigation Access Aug - 2020
4 Soils Sampling and Analysis Jul - 2020
5 Subsurface Utilities Investigation Nov - 2020
6 Geotechnical Investigation Report Oct - 2020
7 Existing Facilities Condition Assessment TM Feb - 2020 8 Fiberoptic Cable Routing Meeting, Walkdown, and Action Plan Mar - 2021 9 Subsurface Utilities Investigation Phase B Jun - 2021 10 Ductbank Conduit Mandrelling Feb - 2021
11 Centrifuge On-Site Testing Feb - 2021
12 DS Transfer Stations Site Visit Mar - 2021
13 Underground Utility Investigation Apr – 2021

1.6 DEWATERING FACILITY SITE ACCESS AND SECURITY
Loading Truck access to the Dewatering Facility Site shall be from the access road that is shared with the Silicon Valley Advanced Water Purification Center off of Zanker Road via a secure gate located near the south side of the Dewatering Facility Site. Staff access to the Dewatering Facility Site shall be from Zanker Road via a secure gate located on the western side of the Dewatering Facility Site. Access to the RWF shall be from the Construction Enabling Site Gate and via the main gate at 700 Los Esteros Road.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
APPENDIX 2

PRELIMINARY SERVICES
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
APPENDIX 2

PRELIMINARY SERVICES

GENERAL REQUIREMENTS
Scope of Base Preliminary Services. The Base Preliminary Services shall consist of the following six Preliminary Services Tasks:
 Task #1: Project Management
 Task #2: Preliminary Investigations
 Task #3: Basis of Design Report (BDR)
 Task #4: 30% Design Completion Documents
 Task #5: 60% Design Completion Documents
 Task #6: Definitive Project Submittal and Supporting Cost Estimates  Task #7: Potential Additional Preliminary Services
Unless specifically excluded from this Amended and Restated Design-Build Contract, the Design-Builder shall provide to the City all surveying, architectural, engineering, geotechnical, landscape, Project management, cost estimating and other professional services necessary to perform the Base Preliminary Services required by this Amended and Restated Design-Build Contract.

Deliverable Material. Required Deliverable Material for each Preliminary Services Task is identified in this Appendix. All Deliverable Material identified in this Appendix shall be reviewed with representatives of the City. The Design-Builder shall promptly correct deficiencies in Deliverable Material and shall promptly make modifications to conform to Project requirements and modifications to achieve acceptability of the Deliverable Material to the City. Draft deliverables shall be provided to the City in .pdf format and in Microsoft® WORD, Microsoft® EXCEL, or native CAD formats, as applicable. Unless specified otherwise, the Design-Builder shall provide electronic copies of all final deliverables in .pdf format. For draft and final design drawing and specification deliverables the Design-Builder shall provide six (6) hard copies to the City. Drawing hardcopies shall be ½-size printed single sided on 11 x 17 paper and bound.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-2
3643403.6 042907 CTR
Standards. The Deliverable Materials shall comply with the City’s standard design details and specifications and industry standards, including, without limitation, those design criteria and specifications included in APPENDIX 4 (Technical Specifications).

2.1 PRELIMINARY SERVICES TASK #1 – PROJECT MANAGEMENT

2.1.1 General Project Management.

The Design-Builder shall provide Project management of the Project team, including management of staffing, budget, schedule, scope and coordination with the City.

This Preliminary Services Task includes managing the scope of work, schedule and budget, preparing a draft Design-Build Quality Management Plan that meets the requirements set forth in APPENDIX 6 of this Amended and Restated Design-Build Contract (Design-Build Quality Assurance and Quality Control Requirements) (including quality control and quality assurance requirements), and communication and coordination with the City. The Design-Builder will prepare invoices, progress reports, and design progression and design decision log updates on a monthly basis. Other activities include keeping the City informed and soliciting input from the City when making key decisions, coordination with Subcontractors, scheduling of staff, and coordinating the quality assurance effort.

Task 2.1.1 Deliverables:
 Draft and final Project Execution Plan
 Monthly Preliminary Services Reports (including narrative, cash flow curve and summary schedule update)

2.1.2 Weekly Project Management Meetings and Technical Workshops and Meetings.

The Design-Builder shall conduct weekly Project management meetings with the DesignBuilder Project managers and City Project managers. An agenda will be distributed by the Design-Builder to the City prior to the meetings, and the Design-Builder will distribute meeting notes and action items within three days after each meeting. Each meeting agenda shall include:
(a) Ongoing activities
(b) Upcoming activities
(c) Scope, schedule and budget
(d) Project risks
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-3
3643403.6 042907 CTR
(e) Issues
(f) Decisions and actions
(g) Change management
(h) Health and safety
Technical Workshops shall be incorporated into Base Preliminary Services to address specific subjects and facilitate collaboration and development of ideas and decisions to be carried forward during design development. Each workshop will last up to four hours in length and will be facilitated by the Design-Builder, the City Project Manager and technical support staff, the Program Manager (Stantec/Carollo) and Owner’s Advisor (Brown and Caldwell). An agenda (including desired outcomes) as well as technical background documents will be distributed to workshop attendees by the Design-Builder prior to the meetings. The Design-Builder will document the outcome of each workshop and distribute meeting notes and action items within three days after each workshop. Technical Workshops may be conducted on the following subjects:
(a) Project Kickoff and Partnering (see APPENDIX 5 (General Design-Build Work Requirements) for details on Partnering)
(b) Preliminary Investigations Planning
(c) Flows and Loads Modifications and Impacts on Project Sizing and Redundancy Requirements
(d) Alternative Analysis and Recommended Project Concept(s) (e) Schedule
(f) Documents Control Requirements
(g) Project Scope Definition
(h) Hydraulic and Process Modeling, including updated mass balance modeling (i) Odor Modeling
(j) Sludge Characterization of TPAD Sludge
(k) Primary Project Components and Process Equipment Selection (l) Additional Alternatives Analysis and Phasing Plan
(m) Site Planning
(n) Dewatering Building Architectural, Structural and Landscape Concepts and Hazardous Area Classifications
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-4
3643403.6 042907 CTR
(o) Electrical Requirements
(p) Instrumentation & Control Requirements
(q) Building Mechanical (HVAC) Requirements
(r) Process Mechanical Requirements
(s) Site/Civil Requirements
(t) Existing Facilities Connection
(u) Subsurface Utility Investigations Results
(v) Hazardous Materials Investigation Results
(w) Dynamic Cost Model
(x) Schedule and Construction Sequencing
(y) CEQA and Permitting Requirements
(z) Project Interface Requirements
(aa) Process Hazard Analysis
(bb) Equipment and Subcontractor Procurement
(cc) Commissioning, Acceptance Testing and Transition Services Requirements (dd) Other topics as determined by the City and Design-Builder Additional meetings may be required to address O&M or other stakeholder concerns and/or to discuss other issues not identified above. The Design-Builder and the City will work together to identify if additional meetings are required and any such additional meetings, if necessary, shall constitute Additional Preliminary Services, the compensation for which shall be negotiated by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) to this Appendix.

Task 2.1.2 Deliverables:
 Meeting Agendas, Materials and Notes
 Technical Workshop Agendas and Notes

2.1.3 Risk Management Requirements.

The Design-Builder shall incorporate risk management into the delivery of the Project in accordance with the Contract Standards as defined in this Amended and Restated DesignDRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-5
3643403.6 042907 CTR
Build Contract. A risk management workshop shall be conducted with the team within 60 Business Days of the kick-off meeting. The workshop shall be used to identify key Project risks and opportunities for avoiding and minimizing risks. A risk register shall be developed and maintained by the Design-Builder using the risk register format provided by the City. The register shall be initially populated with risks identified in the risk management workshop. The risk register shall include the following information:
(a) Risk identification
(b) Activities affected (tied to schedule activities)
(c) Risk description including qualitative categorization of risk (d) Estimated/calculated percent likelihood that risk may occur. (Note: this will be output from quantitative analysis performed on key risks that could exceed target cost or schedule thresholds.)
(e) Phase of Project that risk could impact
(f) Potential schedule impact should risk occur
(g) Potential cost impact should risk occur
(h) Potential health and safety impacts should risk occur (i) Risk trigger
(j) Risk owner
(k) Risk strategy (transfer, mitigate, accept, exploit) Risks shall be reviewed at the weekly Project management meetings.

Additionally, the following risk management workshops shall be conducted to provide for reevaluation of overall risks, a deeper level of risk analysis for identified risks, identification of new risks, and review of risk avoidance, and mitigation measures:
(a) During the development of the BDR
(b) Upon submission of the 30% DCD
(c) Upon submission of the 60% DCD
These workshops are in addition to those listed under Task 2.1.2, above. The risk workshops will last up to four hours in length each and will be facilitated by the Design-Builder. The City Project Manager and technical support staff, the Program Manager (Stantec/Carollo) and Owner’s Advisor (Brown and Caldwell) will attend. An agenda (including desired outcomes) as DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-6
3643403.6 042907 CTR
well as technical background documents will be distributed to workshop attendees by the Design-Builder prior to the meetings. The Design-Builder will document the outcomes of the workshops and distribute draft meeting minutes and action items within five days after each workshop. The City will have five days for review and comment and the Design -Builder will distribute final meeting minutes within five days of receiving City comments.

Ongoing qualitative risk analysis shall be conducted by Design-Builder with review and input from the City. Upon submission of the BDR, the Design-Builder shall conduct quantitative risk analysis (Monte Carlo simulation or similar) to further analyze and understand the possible impacts due to risks. The Design-Builder shall present the findings of such quantitative risk analysis to the City. The Design-Builder shall update the risk register to reflect any such findings.

Task 2.1.3 Deliverables:
 Risk register and updates
 Risk management workshop agendas and workshop notes

2.1.4 Change Management Requirements.

The Design-Builder shall prepare and maintain a change management log for the duration of the Base Preliminary Services. The change management log shall integrate with the Project decision log and be used to document proposed and approved changes to the Project Definition Report requirements, price, schedule, or changes to this Amended and Restated Design-Build Contract. At a minimum, the change management log shall include the following information:
(a) Change identification number
(b) Brief description of change
(c) Status of change (pending, approved, rejected)
(d) Dates associated with change including initial proposal date and change acceptance date
(e) Back-up information including cost, schedule, and technical information Change management shall be a standing agenda item at Project management meetings.

Following approval of the BDR, the change management log shall be used to track changes to the approved Project and their associated cost and schedule impacts.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-7
3643403.6 042907 CTR
Task 2.1.4 Deliverables:
 Change management log and updates
 Back-up information including cost and schedule updates for proposed changes

2.1.5 Project Execution Plan.

2.1.5.1 Submission of Project Execution Plan. In accordance with the Preliminary Services Schedule, the Design-Builder shall develop and submit a Project Execution Plan to the City for review and comment. The Project Execution Plan shall serve as a Project management tool for the City and Design-Builder (including Subcontractors) and will include guidelines and procedures for execution of the work and issues resolution. The Project Execution Plan will be in compliance with the Contract Standards and include:
(a) a description of Design-Builder’s organization, roles, and responsibilities, including an organization chart that identifies all key discipline design leads for the Project and the engineer-of-record for each discipline; (b) a Scope Management Plan that describes how the scope will be defined, developed, monitored, controlled, and verified, including:
(1) process for preparing the Project scope statement;
(2) creation of the Records Management System from the detailed scope statement, and how the Records Management System will be maintained; and
(3) procedures for obtaining formal acceptance of completed Project deliverables and processing of the detailed scope statement; (c) a Schedule Management Plan that describes the criteria and activities for developing, monitoring, and controlling the Design-Build Schedule, including:
(1) Design-Build Schedule model development;
(2) scheduling methodology and scheduling tools;
(3) level of accuracy and the acceptable range used in determining realistic activity durations;
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-8
3643403.6 042907 CTR
(4) units of measure, such as staff hours, staff days, or weeks, as well as physical units of measurement;
(5) organizational procedures links with activities tied to the approved Records Management System;
(6) Design-Build Schedule model maintenance and the process used to update status and record progress of the Project during execution; (7) control thresholds, variance thresholds for monitoring schedule performance and agreed-upon amounts of variation to be allowed; (8) rules of performance management, such as earned value management rules, rules for establishing percent complete, control accounts, earned value measurement techniques, and schedule performance
measurements;
(9) reporting formats, including the formats and frequency of schedule reports; and
(10) descriptions of each of the schedule management processes; (d) a Requirements Management Plan that describes how requirements contained in this Amended and Restated Design-Build Contract (e.g. Governmental Approvals requirements, General Design-Build Work requirements, QA/QC requirements, insurance requirements etc.) will be analyzed, documented, and managed, including documentation of how requirements activities will be planned, tracked and reported.
(e) a Budget Management Plan that describes how the Project budget will be planned, structured, and controlled, including:
(1) units of measure, the level of precision and accuracy; (2) coordination with approved Records Management System; and (3) control thresholds for monitoring budget performance, including the rules of performance measurement (earned value management); DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-9
3643403.6 042907 CTR
(f) a Process Improvements Plan that details the steps for analyzing Project management and design development processes to identify activities that enhance their value;
(g) a Risk Management Plan that describes how risk management activities will be structured and performed, including:
(1) the methodology, approaches, tools, and data sources that will be used to perform risk management on the Project;
(2) roles and responsibilities, defining the lead and support risk management team members for each type of activity and their responsibilities;
(3) budgeting to establish estimates of funds needed based on assigned resources for inclusion in the cost baseline and protocols for application of contingency and management reserves;
(4) timing of risk management processes to be performed through the Project life cycle; and
(5) protocols for application of schedule contingency reserves and risk management activities associated with the Design-Build Schedule; (h) a Procurement Management Plan that describes how the Design-Builder will acquire goods or services from outside its organization, including:
(1) management of procurement processes from developing procurement documents through contract closure;
(2) guidance for the types of contracts to be used and use of independent estimates and standardized documents;
(3) handling of long lead items, requests to self-perform and linking them into activity resources and schedule; and
(4) handling of proprietary and specialized equipment and materials requiring early procurement and design coordination.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-10
3643403.6 042907 CTR
(i) a Design-Build Quality Management Plan that meets the requirements set forth in APPENDIX 6 (Design-Build Quality Assurance and Quality Control Requirements);
(j) a Stakeholder Engagement Plan that identifies the management strategies required to effectively engage stakeholders, including:
(1) stakeholder register (identification of key stakeholders) and the desired and current engagement level of key stakeholders;
(2) scope and impact of change to stakeholders, interrelationships and potential overlap between stakeholders;
(3) coordination with the Communications Management Plan; and (4) the method for updating and refining the stakeholder engagement plan; (k) a Change Management/Integration Management Plan that includes:
(1) identification of procedures that will be used to document any changes from the accepted Reports, Drawings and Specifications; (2) identification of procedures that will be used to document the communication flow to the appropriate contractor’s construction personnel;
(3) description of the process for reviewing all change requests, approving changes and managing changes to deliverables, organization process assets, Project documents, the Project Execution Plan, and communicating their disposition;
(4) Trend Management Log; and
(5) Project Decision Log;
(l) a Document Control Plan that identifies how documents will be managed throughout the Project life cycle, including:
(1) the process of organizing, storing, protecting, and sharing documents; DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-11
3643403.6 042907 CTR
(2) the management of both the hard copy and electronic repositories of documents, historical information, and a consistent approach to the creation, update and format of documents;
(m) a Project Team Structure and Staffing Plan that provides guidance on how the Project will be staffed, managed, and eventually released, including:
(1) roles and responsibilities defining positions, skills and competencies that the Project demands;
(2) Project organization charts indicating the number of people needed for the Project; and
(3) a staffing management plan delineating the time periods each Project team member will be needed and other information important to engage the Project team;

2.1.5.2 Establishment of and Compliance with Project Execution Plan. The City will review the draft Project Execution Plan and return comments in accordance with the Preliminary Services Schedule. The Project Execution Plan will be accepted by the City only after the Design-Builder has addressed all City comments to the reasonable satisfaction of the Project Manager. The Project Execution Plan shall be updated whenever a material change occurs affecting how the Project will be managed and executed. Any subsequent amendments or updates to the Project Execution Plan will be submitted to the Project Manager for review and comment in the same manner as the initial Project Execution Plan. The Design-Builder will implement and comply with the accepted Project Execution Plan, and any accepted amendments or updates thereto, in connection with the performance of the Design-Build Work.

Task 2.1.5 Deliverables:
 Draft and Final Project Execution Plan
 Updates to Project Execution Plan

2.1.6 Communication Plan.

The Design-Builder shall submit seven copies of a draft Communication Plan for review and comment by the City no later than 45 days after the Contract Date. The Communication Plan shall be prepared in collaboration with the City and shall provide contact information for both the Design-Builder and the City (including phone numbers, facsimile numbers, e-mail DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-12
3643403.6 042907 CTR
addresses, and points of contact), communication requirements for the Design-Builder and the City (including frequency and time frame of communications, information to be communicated, and methods or technologies used to convey information), resources allocated for communication activities, the method of updating and refining the plan, flow charts for information flow, and a glossary of common terminology. The Communication Plan shall be organized as a directory available to Design-Builder and City personnel and shall outline points of contact under various circumstances, including emergencies. The Communication Plan will describe procedures the Design-Builder will use to present information to the City’s communication team to alert the public about any critical events such as traffic impacts associated with material or equipment deliveries.

The City will review the draft Communication Plan and return comments within 15 days of the initial submittal. Fifteen days following the return of comments on a draft Communication Plan, the Design-Builder shall submit to the City seven copies of a final version of the Communication Plan incorporating the City’s requested changes. The Communication Plan shall be updated and resubmitted semi-annually or sooner if needed to remain current during the Design-Build Period.

Task 2.1.6 Deliverables:
 Draft and Final Communication Plan

2.1.7 Permits and Approvals Plan.

The Design-Builder shall develop a Permits and Approvals Plan that identifies all required Governmental Approvals, tracks the requirements of the Governmental Approvals and the status of the Governmental Approval application, and communicates any changes to Governmental Approval requirements or changes in conditions affecting Governmental Approvals. The Permits and Approvals Plan shall also include a Specifications and Building Code Report that identifies all applicable City building codes and specifications requirements, describes how the Design-Builder plans to comply with such requirements, and incorporates the CIP Design/Facility Standards and City Standards. The Permits and Approvals Plan shall be updated whenever a material change affecting the plan occurs.

Task 2.1.7 Deliverables:
 Permits and Approvals Plan
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-13
3643403.6 042907 CTR

2.1.8 Preliminary Services Schedule and Design-Build Schedule.

2.1.8.1 Preparation. The Design-Builder shall prepare the Preliminary Services Schedule and Design-Build Schedule using Primavera P6 scheduling software (latest version), and shall submit the Preliminary Services Schedule and Design-Build Schedule as electronic files (native and pdf) and hardcopy.

2.1.8.2 Preliminary Services Schedule. The Preliminary Services Schedule shall be developed using the critical path method, and it shall reflect the schedule, by use of a Gantt or Bar Chart, for all activities comprising the Preliminary Services, and shall set forth all tasks and key subtasks in a logical and efficient work sequence that the Design-Builder intends to utilize in taking the Project from execution of the Design-Build Contract to the Amended and Restated Design-Build Contract Date.

The Design-Builder shall submit the Initial Preliminary Services Schedule on the Contract Date. During the Preliminary Services Period, the Design-Builder shall update the Initial Preliminary Services Schedule on a monthly basis. The Initial Preliminary Services Schedule, as updated pursuant to this subsection, is referred to herein as the Preliminary Services Schedule.

The Design-Builder shall undertake and complete the Preliminary Services in accordance with the Preliminary Services Schedule. Updates on the Design-Builder’s compliance with the Preliminary Services Schedule shall be submitted monthly with the Monthly Project Report required by Section 2.1.10 (Monthly Preliminary Services Report Requirements) of this Appendix and Section 5.6(B) (Monthly Preliminary Services Reports) of the Design-Build Contract (prior to amendment by this Amended and Restated Design-Build Contract).

2.1.8.3 Design-Build Schedule. The Design-Builder shall submit the draft Initial Design-Build Schedule at the kick-off meeting required by Section 2.1.13 (Kickoff Meeting and Partnering) of this Appendix, and shall update the draft Initial Design-Build Schedule during the Preliminary Services Period in accordance with this Appendix. The Design-Build Schedule shall meet the requirements set forth in this Appendix and APPENDIX 5 (General Design-Build Work Requirements).

During the Design-Build Period, the Design-Builder shall update the Initial Design-Build Schedule in accordance with the requirements set forth in Section 5.3 (Design-Build Schedule) of APPENDIX 5 (General Design-Build Work Requirements).

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-14
3643403.6 042907 CTR

2.1.8.4 Minimum Requirements. At a minimum, the Preliminary Services Schedule and the Design-Build Schedule shall generally include:
(a) Start date for each activity
(b) Finish date for each activity
(c) Major milestones
(d) Meeting and workshop dates
(e) Submittal dates including draft submission dates, City review periods, and final submission dates
(f) Identification of critical path
(g) Float

2.1.8.5 City Review. The City shall review and comment on the Initial Preliminary Services Schedule and the draft Initial Design-Build Schedule within 15 days of receipt. Comments on the Initial Preliminary Services Schedule or draft Initial Design-Build Schedule shall be discussed at the weekly Project management meeting following receipt of any comments provided by the City. The Design-Builder shall provide a revised Preliminary Services Schedule or revised draft Initial Design-Build Schedule, as applicable, based on agreed-to changes at the next weekly Project management meeting.

The City shall review and comment on the update to the Preliminary Services Schedule or the draft Initial Design-Build Schedule. The review process shall include evaluation of missing logic, critical path, leads and lags, and float, percent complete, and changes in schedule logic or activity durations. Comments on the updates to the Preliminary Services Schedule or the draft Initial Design-Build Schedule shall be discussed at the weekly Project management meeting following receipt of any comments provided by the City. The Design-Builder shall provide an updated Design-Build Schedule or Preliminary Services Schedule based on agreedto changes on a monthly basis.

Task 2.1.8 Deliverables:
 Draft and Final Preliminary Services Schedule and Design-Build Schedule and monthly updates

2.1.9 Document Submittal Procedures.

Within 10 Business Days following the Contract Date, the Design-Builder shall submit to the City a set of document submittal procedures (“Document Submittal Procedures”). The DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-15
3643403.6 042907 CTR
Document Submittal Procedures shall identify the key document submittal packages to be prepared by the Design-Builder and the expected submittal dates to the City. Documents submittal packages to be submitted include, but are not limited to, reports, studies, technical memorandums, BOD, 30% DCD, 60% DCD and Final DCD. The Document Submittal Procedures shall also identify the frequency of the Design-Builder’s design progress meetings during various phases of the design. The Document Submittal Procedures shall require the Design-Builder to submit a minimum of one original and six paper copies of each document submittal with electronic and CD copies as requested by the City. The Document Submittal Procedures shall also require the Design-Builder to distribute the document submittals as directed by the City. The Design-Builder may propose to create a project web site, accessible to the City and City-designated representatives and compatible with the City’s EADOC site, for posting all document submittals and other reference information. Implementation of the project website shall be subject to the City’s approval. The City may reduce the requirements for hard copies and electronic and CD copies of submittals in consideration of access to information on the web site.

Task 2.1.9 Deliverables:
 Document Submittal Procedures

2.1.10 Monthly Preliminary Services Report Requirements The Design-Builder shall submit Monthly Preliminary Services Reports during the Preliminary Services Period which meet the requirements set forth in Section 5.6(B) (Monthly Preliminary Services Reports) of this Amended and Restated Design-Build Contract. The Monthly Preliminary Services Reports will include a summary of activities that occurred over the calendar month and the activities that are anticipated for the upcoming month, updated design decision logs, a summary of the budget indicating total expenditures, percent of budget expended and a summary of progress for the each of the various Preliminary Services Tasks.

Task 2.1.10 Deliverables:
 Monthly Preliminary Services Reports

2.1.11 Records Management System.

The Design-Builder will work within the City’s electronic records management systems (City Web Portal and EADOC) to facilitate work flow and transmit and store written documents associated with the Project. The system will be utilized by the City, Design-Builder, and their Subcontractors and vendors to transmit, review and respond, log, and store Project related documents. The records management system will incorporate the following:

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-16
3643403.6 042907 CTR
(a) Overall Project tracking and monitoring of key performance indicators; (b) Meeting and workshops agendas, presentations, and notes; (c) Action items, issues, decision logs, and tracking;
(d) Budget and schedule tracking;
(e) Risk tracking and mitigation;
(f) Submitting and tracking requests for information (RFIs); (g) Document submittals and transmittals including drawings (pdf format); (h) Quality management documentation including comments, responses, and confirmations;
(i) Value engineering submissions;
(j) Invoices and monthly reports;
(k) Templates and tools;
(l) Project related communication; and
(m) Dashboards of Project progress for the City.

Task 2.1.11 Deliverables:
 Records Management System documentation
 Posting of deliverables required by this Appendix
 Entry and updating of on-line logs (action, issue, decision)  Posting of RFIs

2.1.12 Computerized Maintenance Management System.

The Design-Builder shall work within the City’s Computerized Maintenance Management System (“CMMS”) in accordance with the Contract Standards. A plan for integrating with the CMMS will be provided to the City not later than 365 days following the Contract Date.

In preparing the CMMS input, the Design-Builder shall, in consultation with the City, conform to the established standardized equipment hierarchy, failure codes, and a preventive maintenance program, with detailed job plans. The Design-Builder shall tailor the CMMS preventive maintenance program to the specific requirements of the Digested Sludge Dewatering Facility equipment based on the BDR. The CMMS shall include Digested Sludge DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-17
3643403.6 042907 CTR
Dewatering Facility appearance maintenance activities for buildings, structures, and grounds, and will be capable of the following:
(a) tracking and managing preventive, predictive, and corrective maintenance tasks, including their frequencies and their costs in time and materials; (b) recording and creating equipment maintenance histories; (c) scheduling and control of preventive, predictive and corrective maintenance tasks;
(d) issuing notifications and work orders for preventive, predictive, and corrective maintenance tasks;
(e) tracking inventories and locations of equipment, materials, component parts and spare parts to include an inventory control system capable of tracking specific equipment, budgets and costs using the following information:
(1) inventory identification and description;
(2) location identification and description;
(3) manufacturer name and manufacturer part number;
(4) quantity on hand;
(5) unit and unit cost;
(6) main supplier and alternative supplier; and
(7) order level and order quantity.
(f) tracking equipment performance, service history, repair warrantees, repair costs, installation dates, replacement values, and all data needed to prepare financial reports in accordance with the Contract Standards; (g) issuing reports and information, including:
(1) equipment status and repair reports;
(2) lifecycle asset costs;
(3) asset maintenance frequencies and histories;
(4) status reports on predictive, preventive, and corrective maintenance activities;
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-18
3643403.6 042907 CTR
(5) work order status and inventory control levels of spare parts and availability for optimization; and
(6) job completion reports;
(h) retaining historical data and information for a minimum of 10 years.

The required information for adherence to the CMMS program will be memorialized in the Dewatering Project Operation and Maintenance Manual which will be developed in coordination with O&M staff. All maintenance tasks and frequencies will be stored and managed in the CMMS in chronological (date-based) order for the Digested Sludge Dewatering Facility. The CMMS input will be fully compatible with the system utilized by the City at the Regional Wastewater Facility.

2.1.13 Kickoff Meeting & Partnering.

Within two weeks after the initial Preliminary Services Task Notice to Proceed, key staff members of the City, the Program Manager, the Owner’s Advisor, and Design-Builder will participate in a Project kick-off/partnering workshop (see Section 5.2.2 (Partnering Sessions) of APPENDIX 5 (General Design-Build Work Requirements) for a discussion of facilitator selection and other aspects of Project partnering sessions). The goal of the workshops is to deepen working relationships, develop common goals and objectives for the Project, and achieve a cooperative partnership environment among Project participants. The workshop attendees, agendas, facilitation, and venue will be coordinated by the City and Design-Builder’s Project managers immediately following the Preliminary Services Task Notice to Proceed. The costs relating to the partnership workshop conducted pursuant to this Section during the Preliminary Services Period are included in the Preliminary Service Fee.

Task 2.1.13 Deliverables:
 Kickoff Agenda and Meeting Notes
 Draft and Final Partnering Charter

2.1.14 Constructability Reviews.

2.1.14.1 Basis of Design Stage. During preparation of the BDR, the DesignBuilder shall develop a general sequencing plan for constructing the Digested Sludge Dewatering Facility to achieve production milestones. The Design-Builder shall also develop an initial plan for proposed site access, site utilization for storage of equipment and materials, site exit, temporary construction facilities (parking, staging, storage, stormwater controls, and trailers or alternative plans for housing Design-Builder and the City) (the “Mobilization and Site DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-19
3643403.6 042907 CTR
Access Plan”). The Mobilization and Site Access Plan will indicate proposed locations for the City’s operations staff and delivery vehicles, and City employee parking for all months during construction. A schematic will be provided showing areas to be used by the Design-Builder for storage of construction materials and equipment, the location of a temporary construction trailer and for construction of new facilities including required setbacks and traffic flow for the construction vehicles entering and exiting the Digested Sludge Dewatering Facility Site. The Design-Builder shall conduct two workshops with the City to review considerations and recommendations.

Task 2.1.14.1 Deliverables:
 Workshop(s) agenda, presentations and meeting notes
 Initial Sequencing Plan Technical Memorandum (Draft and Final)  Constructability review report for 30% Design (Draft and Final)  Constructability review report for 60% Design (Draft and Final)

2.1.14.2 30% and 60% Design Stage. The Design-Builder shall provide for constructability reviews of the design at the 30% and 60% design submittal milestones as follows:
(a) Identify and establish a team of individuals among the Design-Builder team primarily responsible for Construction who will undertake constructability reviews on behalf of the Design-Builder;
(b) Submit 30% or 60% design submittal, as applicable, to Design-Builder’s constructability review team and to the City for constructability review; (c) Schedule and conduct constructability workshop with Design-Builder’s constructability review team and the City;
(d) Discuss recommendations with the City and conduct follow-up evaluations including cost, schedule, and risk impact analysis of any preliminary constructability comments that are tentatively agreed-to; (e) Prepare written constructability review report;
(f) Meet and review constructability review report and results of constructability evaluations with City; and
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-20
3643403.6 042907 CTR
(g) Proceed with agreed-to changes.

Task 2.1.14.2 Deliverables:
 Written constructability review report
 Workshop agenda

2.1.15 Value Engineering.

Value engineering (VE) shall be conducted at the basis of design milestone by the value engineering team designated by the City. The VE firm is contracted and paid for by the City.

The Design-Builder is responsible for providing engineering and construction staff to participate in VE. The Design-Builder shall submit a draft of the BDR to the value engineering team and participate in a value engineering workshop to be conducted by the value engineering team. The value engineering team shall prepare a value engineering report, and the DesignBuilder shall review such report and prepare responses to the value engineering recommendations, including a discussion of cost impacts, Design-Build Schedule impacts, and operating and maintenance considerations. The Design-Builder will provide its Project Manager, Design Manager, and any additional discipline engineers necessary for the “First Day” and “Final Day” VE workshops. The Design-Builder shall meet with the City to review responses and submit final recommendations regarding value engineering input to the City for review and approval. Upon approval by the City, the Design-Builder shall proceed with the agreed-to changes.

Task 2.1.15 Deliverables:
 Draft of the BDR design submittal to the VE team
 Presentation for VE team
 Formal responses to value engineering recommendations

2.1.16 Cost Model
As part of the Preliminary Services, the Design-Builder shall provide updated cost estimates.

To provide consistent information, the Design-Builder shall utilize a cost model approach, as follows:
(a) Build a cost model framework consistent with the requirements of Error! Reference source not found. (prior to amendment by this Amended and Restated Design-Build Contract).

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-21
3643403.6 042907 CTR
(b) Provide the initial cost model within 60 Business Days of the Preliminary Services Notice to Proceed. After providing the initial cost model, conduct a dynamic cost model workshop to present the cost model framework and demonstrate model functionality with both costs and markups. (c) Prior to and during the Options Analysis period, described further in Task 2 below, the Design-Builder shall advance the Cost Model for both at least one of the indicative designs and the alternative concept. After the option is selected at the end of the Options Analysis period, the Design-Builder will advance a single Cost Model.
(d) Provide update cost model reports monthly. Review the updated cost model reports, on time per month, at the weekly Project Management meetings. (e) Submit all milestone cost estimate updated, as required within APPENDIX 2 (Preliminary Services), so that all estimates align to the cost model framework.

Task 2.1.16 Deliverables:
 Cost model framework in pdf and MS Excel
 Workshop agenda and meeting notes
 Updated cost model reports in pdf and MS Excel

2.1.17 Equipment and Subcontractor Procurement
As part of the Preliminary Services, the Design-Builder shall provide updated cost estimates.

To provide consistent information, the Design-Builder shall utilize an approach as follows:
(a) Prior to engaging the market, conduct an Equipment and Subcontractor Procurement workshop with the City to discuss a procurement plan that identifies outreach approaches, package strategy, timing, and potential level of commitment communicated to the market, both for Subcontractors and equipment Suppliers. The equipment procurement plan shall include all major equipment, such as centrifuges, conveyors, cake bins, major electrical equipment and sludge storage tanks. The equipment procurement plan shall also include general procedures to be followed for other equipment. The Subcontracting Plan shall include all major Subcontractors, such as electrical, mechanical, etc.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-22
3643403.6 042907 CTR
(b) Administer a budgetary proposal process to obtain preliminary pricing. (c) Administer an official procurement process, to obtain firm pricing and to select equipment suppliers or Subcontractors. Selections of suppliers and Subcontractors shall be approved by the City.

Task 2.1.17 Deliverables:
 Package strategy in pdf and MS Excel
 Workshop agenda and meeting notes
 Necessary documentation needed to recommend and select equipment supplier or Subcontractor

2.2 PRELIMINARY SERVICES TASK #2 – PRELIMINARY INVESTIGATIONS

2.2.1 Information Review and Verification.

As part of the Preliminary Services, the Design-Builder shall complete a comprehensive review of the proposed digested sludge dewatering facility site, existing digesters, existing digested sludge transfer pumps, digested sludge storage, and pumping sites and conveyance corridor identified in the indicative design. Investigations shall be carried out in a way that protects the environmentally sensitive areas shown on preliminary plans. All reviews performed under this Preliminary Services Task shall be performed to the maximum extent reasonably possible in the circumstances and in a manner that provides a reasonable basis for the Design-Builder to undertake the risks assumed under Section 6.3 (Differing Site Conditions) and subsections

6.5(B) (Design-Builder Governmental Approval Responsibility), and 6.6(B) (Sole Responsibility and Liability) of this Amended and Restated Design-Build Contract.

This task includes a review of reference documents, site analysis, condition assessment of certain existing facilities, site surveying and mapping, subsurface utility investigations and field locating, geotechnical investigations, hazardous material investigations and the preparation of Technical Memoranda summarizing the results of the investigations.

The Design-Builder shall identify any other investigations deemed necessary by the DesignBuilder to fully acquaint itself with existing conditions for purposes of performing the Project.

The Design-Builder shall coordinate all field investigations of the Digested Sludge Dewatering Facility Site(s) with the City. Within 45 calendar days after the Contract Award, the DesignBuilder will provide a comprehensive plan for all field investigations and condition reviews. The City will provide comments on this plan within 15 calendar days of receiving the plan.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-23
3643403.6 042907 CTR
Preliminary Investigations shall include, but not be limited to:
(a) Site surveying and mapping,
(b) Subsurface utility investigations
(c) Field locating existing utilities,
(d) Geotechnical investigations, and
(e) Hazardous material investigation.

2.2.2 Review of Reference Documents
The existing mesophilic digesters, existing arrangement for transfer pumps and Digested Sludge Export Pump Station (DSEPS), proposed new digested sludge storage and pumping sites and conveyance corridor, operations, maintenance, permits, requirements, regulations, constraints, and the City’s requirements and objectives for the Project.

Existing conditions information at the Digested Sludge Dewatering Facility Sites provided by the City, including all available as-built information, geotechnical reports, engineering studies and reports, environmental studies, data, memos, reports, surveys, and site measurements.

Environmental documents, including the addendum to the EIR, mitigation requirements under the Environmental Mitigation Measures and reporting requirements under the Mitigation Monitoring Reporting Program (MMRP).

Identification of data gaps that require additional investigations. Any additional investigations proposed will be discussed with the City and if determined that they are prudent, such additional investigations, if necessary, shall constitute Additional Preliminary Services, the compensation for which shall be negotiated by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) of this Appendix.

Task 2.2.2 Deliverables:
 Work Plan for Review of Reference Documents
 Draft Technical Memorandum on Reference Document Review  Final Technical Memorandum on Reference Document Review

2.2.3 Site Analysis
The Design-Builder shall analyze Digested Sludge Dewatering Facility Site ingress and egress requirements and restrictions, traffic conditions, time of work restrictions, and requirements of DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-24
3643403.6 042907 CTR
public and private authorities with jurisdiction over roadways to and from the Digested Sludge Dewatering Facility Site, parking, traffic between the dewatering site and the rest of the Regional Wastewater Facility (RWF) and any other restrictions or considerations that may affect the Design-Builder’s work. The result of all site analyses will be presented to the City in the form of a Technical Memorandum.

Task 2.2.3 Deliverables:
 Work Plan for Site Analysis
 Draft Technical Memorandum on Site Analysis
 Final Technical Memorandum on Site Analysis

2.2.4 Existing Facilities Condition Assessments
Most facilities developed as part of the Dewatering Project will be new. However, the Project requires connections to certain existing facilities potentially including: (1) existing digesters, including digested sludge and digester gas systems; (2) existing power supplies; (3) the existing distributed control system and other control networks such as the communications and fire alarm networks; (4) existing utilities such as potable water supplies; and (5) the Emergency Basin Overflow Structure (EBOS) or existing sewer interceptors.

Investigation of condition of existing structural, mechanical, electrical, and control systems, including identification of code deficiencies that may require performing upgrades as part of the project (e.g. seismic, NFPA 820, handrails).

Investigation of operability and performance of gates, valves, equipment, and support systems to identify deficiencies that may need repair or replacement and that may be required to provide isolation of facilities during construction. Operation of existing gates, valves, equipment and support systems will be coordinated with O&M staff, as required.

Investigation of O&M staff concerns with existing digester facilities to identify perceived deficiencies that will be modified or replaced as part of the Project.

Task 2.2.4.4 Deliverables:
 Work Plan for Existing Conditions Assessments
 Draft Technical Memorandum on Existing Condition Assessments  Draft Technical Memorandum Review Meeting Agenda, Meeting Materials, and Notes DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-25
3643403.6 042907 CTR
 Final Technical Memorandum on Existing Digested Sludge Dewatering Facility Condition Assessments

2.2.5 Subsurface Utilities Investigation
The Design-Builder shall conduct underground utility investigations of the “Dewatering Facility Site” as defined in Section 1.1 (Definitions) of this Amended and Restated Design-Build Contract. The purpose of this activity is to compile enough information to proceed with design activities. The scope of the underground utility investigation shall include, but not limited to, the following activities:
(a) Review of existing documentation including record drawings, if available, and GIS Maps in consultation with City staff.
(b) Field locate of all locations to be investigated based on the results of the information review as described above.
(c) All underground utility investigation shall be performed by a water vacuum truck or other excavation equipment, as necessary. This scope of work assumes the completion of thirty five (35) potholes in different locations and three (3) fullwith trenches across G Street to a depth of five (5) feet. (d) Provide traffic control or flagging as necessary to complete the work. (e) Dispose of truck spoils in a contained onsite location provided by the City. (f) Identify and document as a minimum for every located utility the following items: horizontal coordinates, depth to top and bottom, material, apparent condition, diameter for circular utilities, dimensions for encasements or duct banks or other structures.
(g) Fill all investigation holes with an appropriate, excavatable material (sand, pea gravel, slurry) as conditions require once information is recorded. Larger excavations shall be backfilled with native material and compacted to 90% relative compaction. Trenches shall be backfilled with compacted aggregate base to the elevation of the existing road surface.
(h) Record “as-built” information resulting from the investigations. (i) Coordinate with environmental field investigations and monitoring as required by the Project’s MMRP.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-26
3643403.6 042907 CTR
Based on the review of reference documents provided by the City and supplemental subsurface utilities investigations, the Design-Builder will prepare a report describing and identifying the locations of existing subsurface utilities at the Digested Sludge Dewatering Facility Site and the locations of man-made objects or structures.

For circumstances where existing information is either conflicting or not available, the DesignBuilder will be responsible of identifying, designating, locating, and mapping existing and abandoned utility infrastructure. Identification techniques may include magnetic, sonic, and acoustic technologies, ground penetrating radar (GPR), and radio frequency detection. The utility descriptions will be considered current as of the date of the Subsurface Utilities Investigation Report.

Additional subsurface investigations required to resolve conflicts or to complete work not identified in the scope set forth above in this Section, if necessary, shall constitute Additional Preliminary Services, the compensation for which shall be negotiated by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) of this Appendix.

Task 2.2.5 Deliverables:
 Work Plan for Subsurface Utilities Investigation, including Health and Safety Plan  Draft Subsurface Utilities Investigation Report
 Draft Report Review Meeting Agenda, Meeting Materials, and Notes  Final Subsurface Utilities Investigation Report

2.2.6 Geotechnical Investigations.

The Design-Builder’s geotechnical engineer shall conduct geotechnical investigations at the Digested Sludge Dewatering Facility Sites, including the triangular area south of Digesters 13 and 14, the pipeline routes for digested sludge, centrate, storm water and other buried utilities to be constructed between the triangular area south of Digesters 13 and 14 and the Digested Sludge Dewatering Facility site east of Zanker Road, and other locations where Project facilities and systems may be located. The results of the geotechnical investigations will be used to develop allowable bearing pressures and other critical design criteria used by the DesignBuilder during preparation of the Basis of Design Report, and to fully characterize expected geotechnical and hydrogeological conditions recognizing the City’s objective of reducing the risk of unforeseen subsurface geotechnical or hydrogeological conditions.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-27
3643403.6 042907 CTR
Prior to field investigations, the geotechnical engineer shall review select information available online or as provided by the City, which is pertinent to the site conditions in the vicinity of the project. This information may include prior geotechnical reports, subsurface information, grading information and previous test data results.

2.2.6.1 Geotechnical Field Exploration. The geotechnical engineer shall explore subsurface conditions at the Digested Sludge Dewatering Facility Sites. The investigations shall be adequate to accurately characterize soil and groundwater conditions within all Construction areas, recognizing the City’s objective of reducing the risk of unforeseen subsurface conditions.

The geotechnical engineer’s scope of the investigations shall provide the information required by the Design-Builder’s structural engineer and the Design-Builder’s construction manager as needed to support the design. The geotechnical engineer’s initial scope document shall be submitted to the City for its review and approval prior to the performance of the geotechnical investigation. The Design-Builder shall provide an experienced geologist or engineer to continuously observe the borings, log the subsurface conditions, collect representative soil samples, and transport all samples to the Design-Builder’s laboratory for further visual examination and testing.

The following activities are included as part of the currently budgeted scope:
(a) Geotechnical Reconnaissance – The geotechnical engineer will perform a reconnaissance of the site and the nearby site vicinity to evaluate the potential presence of geologic hazards, including fault rupture, slope instability, prior fill, expansive soils, and other features indicative of potential geologic hazards. (b) Health and Safety Plan – The Design-Builder shall prepare project-specific Health and Safety Plans (HSP) for the sites pertaining to the specific geotechnical activities to be completed. The HSP shall provide information including the proper personal safety equipment to be worn on-site, directions to the nearest public emergency room, and information for the key contact personnel involved in the project.
(c) Exploratory Borings – To explore the subsurface conditions, the Design-Builder shall conduct borings as required to support the design and meet the City’s objective of minimizing subsurface risk. The number and type of exploratory borings and the geotechnical field program are based on the following assumptions:

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-28
3643403.6 042907 CTR
(1) The Design-Builder shall drill, log and sample a total of thirteen (13) exploratory borings, five (5) at the main dewatering site, two (2) at the storage tank site, two (2) at the potential jack-and-bore pits for the pipeline crossing of Zanker Road, and four (4) along the proposed new pipeline alignment.
(2) Borings shall be conducted using conventional, truck-mounted hollowstem auger, drilling equipment. Conventional borings will extend to depths of approximately 50 to 100 feet (or practical refusal) for the dewatering and storage tank sites, 30 to 45 feet for the jack-and-bore pits, and 15 to 20 feet for the new pipelines. The Design-Builder shall collect soil samples from borings for visual classification, laboratory testing, and for correlation with CPT exploration data. The final depth and location and depth of all explorations may be modified in the field, as mutually agreed upon with the City.
(3) Cone Penetration Tests (CPT) – Nine (9) Cone Penetration Tests (CPTs) shall be conducted using truck-mounted CPT equipment. The DesignBuilder shall extend CPTs depths of approximately 75 to 100 feet or practical refusal. The final depth and location and depth of all explorations may be modified, as mutually agreed upon with the City. (4) Utility Clearance – The Design-Builder shall mark boring locations at least two working days prior to beginning its explorations as required by Applicable Law and shall notify the regional utility notification center Underground Service Alert (USA) and the City, so that public and private utilities can be identified and marked at ground surface. Where practical, the Design-Builder shall mark locations in white paint, or otherwise designate its exploration locations, as requested by USA. Within the operational area for the Facility, utility location is performed by the City’s GIS group. Identification in areas outside the operational area, may require a contract with a private utility locator.
(d) The Design-Builder shall coordinate with environmental field investigations and monitoring as required by the Project’s MMRP.

Upon arrival at the Digested Sludge Dewatering Facility Sites, the Design-Builder and geotechnical engineer’s crew will be given ready access to work locations by the City and clear DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-29
3643403.6 042907 CTR
site access will be provided for equipment at the time of drilling. The geotechnical engineer shall obtain a geologic testing permit and an encroachment permit from the City. Additionally, explorations shall be permitted and backfilled with cement grout in accordance with Santa Clara Valley Water District guidelines. During site exploration, drill spoils generated during drilling shall be placed in 55-gallon drums, sampled, tested, and disposed of at an off-site location. The drums will be stored on-site at a location designated by the City and shall remain there for approximately 3 to 4 weeks while the laboratory analyzes the soil samples. A City representative will be on site to sign the manifest paperwork prior to removal of the drums.

The Design-Builder’s scope of services to be provided under this Section shall include sampling, testing, and off-haul and disposal of up to 28 drums of soils to be hauled off site for proper disposal by the Design-Builder. If analytical testing indicates that the drummed soil is Hazardous Material, the special handling and disposal of such drummed soil, if necessary, shall constitute Additional Preliminary Services, the compensation for which shall be negotiated by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) of this Appendix.

The Design-Builder’s scope of services under this Section specifically excludes the assessment of environmental characteristics at the site, particularly those involving Hazardous Materials. If obviously impacted materials are encountered during the geotechnical exploration, the DesignBuilder shall discontinue work and notify the City of the condition encountered. The DesignBuilder shall proceed with the geotechnical scope of work, once mutually agreed upon by the parties. Payment for added costs incurred because of suspected hazardous substances will be negotiated with the City. If suspected Hazardous Materials are encountered, the resulting additional work required to be performed by the Design-Builder shall constitute Additional Preliminary Services, the compensation for which shall be negotiated by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) of this Appendix The geotechnical engineer shall exercise due care while working at the Digested Sludge Dewatering Facility Sites. It is anticipated that some surface disturbances will be unavoidable and that safe and adequate restoration will be provided by the Design-Builder. The site restoration requirements imposed upon the Design-Builder are limited to the previously described backfill activities and general clean-up.

2.2.6.2 Geotechnical Laboratory Testing. The Design-Builder shall have a series of geotechnical laboratory tests completed on soil samples obtained from the geotechnical field explorations to evaluate the engineering and index properties of the Digested Sludge Dewatering Facility Sites subsurface materials. To evaluate the index and engineering DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-30
3643403.6 042907 CTR
properties of site soils, the following laboratory tests are anticipated: following laboratory tests are anticipated:
(a) In-situ Moisture/Density, American Society for Testing and Materials (ASTM) D2216 and D7263 Test Procedures.
(b) Grain Size Distribution, ASTM D1140.
(c) Atterberg Limits, ASTM D4318.
(d) Unconsolidated-Undrained Triaxial Shear, ASTM D2850. (e) One-Dimensional Consolidation (to evaluate the compressibility of the underlying soils for detailed settlement analysis), ASTM D2435. (f) Resistance (R-value) tests, Caltrans Test Method 301 for pavement design purposes.
(g) Soil Corrosion, (pH, resistivity, sulfates, and chlorides).

Soil samples will be stored for 30 days after submittal of Design-Builder’s report and then discarded unless City requests longer-term storage.

2.2.6.3 Imported Soil Source Identification. The Design-Builder shall identify a source or sources of suitable soil that may be imported to the Digested Sludge Dewatering Facility Sites as required to raise the site for protection against flooding, if ultimately required, and for any other purposes. The Design-Builder shall be responsible for testing and analyzing the proposed imported soil to verify that it is free of hazardous or other deleterious materials and has suitable engineering properties for the intended purposes. The Design-Building shall also obtain agreements and any required permits to import soil. Regarding the use of on-site soils, to the extent the Design-Builder has tested and characterized on-site soils and found them to be free of hazardous materials and to the extent such soils are suitable for the intended purpose, the Design-Builder may reuse soils excavated during construction; however, the Design-Builder may not excavate on-site soils solely for use on site. The scope of work to be performed by the Design-Builder pursuant to this Section will include the evaluation of up to five (5) import sources including two (2) on-site and three (3) potential off-site soil import sources from a geotechnical standpoint for use on the project site during construction of the proposed improvements.

2.2.6.4 Geotechnical Review and Report Preparation. To supplement the field exploration and laboratory testing programs, the geotechnical engineer shall review various sources of geotechnical information concerning the Digested Sludge Dewatering Facility Site.

Such sources may include geologic maps, seismologic literature, and other published DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-31
3643403.6 042907 CTR
documents. Any available soil logs and laboratory test results associated with previous subsurface explorations performed on or near the Digested Sludge Dewatering Facility Sites shall also be reviewed. Field exploration data, laboratory testing data, and research findings shall be evaluated to develop conclusions and recommendations concerning the geotechnical aspects of the Digested Sludge Dewatering Facility Sites. After analyzing the Digested Sludge Dewatering Facility Sites conditions, a preliminary geotechnical engineering study will be prepared for the Project.

2.2.6.5 Engineering Analysis. The engineering analysis phase of work will focus on developing site grading recommendations and geotechnical design parameters for foundations, retaining structures and pavement areas. The data obtained from the field investigation and the laboratory testing program will be utilized in the engineering analysis.

The report will include the following specific items:
(a) Site plan showing exploratory boring and CPT locations on a base map (b) Descriptive logs of exploratory borings and CPTs, including depth to groundwater (if encountered)
(c) Laboratory test results
(d) Subsurface conditions, including expansion potential (e) Conclusions regarding on-site liquefaction potential (f) Preliminary soil corrosion screening
(g) Geologic hazards and seismicity (including liquefaction potential) (h) Site preparation and earthwork recommendations including raising the existing site elevations
(i) Foundation type and design recommendations including deep foundations, as needed
(j) Recommendations for dewatering
(k) Lateral earth pressures and drainage for retaining wall design (l) Temporary shoring design recommendations (including construction monitoring) (m) Interior and exterior slab-on-grade recommendations (n) Recommendations concerning trench backfill
(o) Recommendations for jack-and-bore pits and thrust-block design DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-32
3643403.6 042907 CTR
(p) Recommendations concerning temporary and permanent drainage systems (q) Flexible asphalt and rigid concrete pavement recommendations (r) Recommendations for construction monitoring
(s) Explanation of report limitations
(t) Recommendations for further geotechnical study, if necessary, and identification or principal geotechnical and hydrogeological risks and what can be done to reduce or manage them.

The City retains the right to review the draft report in terms of its adequately characterizing the Dewatering Facility Site for the purpose of reducing the risk of encountering unforeseen subsurface condition during construction, and may elect to have the Design-Builder conduct additional field investigations to supplement the report.

Following preparation of the geotechnical report, the Design-Builder will review its BDR, 30% DCD and 60% DCD (all as defined below) documents to ensure the plans and specifications have incorporated the intent of the geotechnical engineer’s recommendations. The DesignBuilder shall submit a draft geotechnical report for review and approval by the City. Any City comments shall be discussed at the next monthly Project management meeting, and the Design-Builder shall prepare a final geotechnical report based upon the comments received.

Task 2.2.6 Deliverables:
 Work Plan for Geotechnical Investigations
 Draft Geotechnical Report
 Draft Report Review Meeting Agenda, Meeting Materials, and Notes  Final Geotechnical Report

2.2.7 Sludge characterization

2.2.7.1 City Characterization of Mesophilic Digested Sludge and Establishment of Minimum Acceptance Standards. At the time of the Contract Date, sludge from the City’s new Temperature-Phased Anaerobic Digestion Process (TPAD), which is under construction, will not be available for characterization. However, the City has been characterizing sludge from its current mesophilic process in order to help establish the values for Minimum Acceptance Standards for dewatered cake total solids content and for polymer use (see APPENDIX 9 (Commissioning and Acceptance)). The Design-Builder shall review the City’s characterization testing results and will cooperate with the City in establishing values for these DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-33
3643403.6 042907 CTR
Minimum Acceptance Standard. Mutually acceptable values for these Minimum Acceptance Standards will be incorporated into the Amended and Restated Design-Build Contract.

2.2.7.2 Process for Establishing Acceptance Standards. The Design-Builder will conduct additional studies, as needed, to establish expected characteristics for TPAD sludge in order to help establish values for the more stringent Acceptance Standards for dewatered cake total solids content and for polymer use (see APPENDIX 9 (Commissioning and Acceptance)).

These standards shall be established cooperatively with the City. Mutually acceptable values for these Acceptance Standards will be incorporated into the Amended and Restated DesignBuild Contract.

The development of dewatering performance standards will be established in a collaborative manner between the Design-Builder, the City, and the Owner’s Advisor. In order to establish the performance standards, the Design-Builder will:
(a) Review of Historical Data – Review current digester performance (volatile solids reduction), volatile solids content of digested sludge as well as specific sludge characteristics that could influence dewaterability (phosphate, iron, pH, cations).
(b) Review Lab Dewaterability Test Results – Review data available from lab testing provided by the City and provide relative data to centrifuge vendors in advance of pilot testing.
(c) Review TPAD Design Criteria – Review calculated/estimated volatile solids reduction for TPAD design that will be used to calculate volatile solids content of digested sludge feed to dewatering process.
(d) Conduct On-Site Centrifuge Testing – Coordinate and perform on-site pilot testing with four manufacturers. On-site performance testing will include limited polymer optimization. Additional detailed scope for the testing is included below.
(e) Review Available Data from Operational TPAD Facilities – Review historical dewatering performance at similar facilities operating on TPAD. (f) Conduct a workshop to discuss and recommend centrifuge performance standards. This workshop will present findings of data review, historical DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-34
3643403.6 042907 CTR
performance, equipment testing, input from vendors and the assessment of the project team.

The centrifuge equipment testing shall be conducted over approximately six (6) weeks with a total of four (4) prequalified manufacturers: Alfa Laval, Andritz, Flottweg and GEA/Westphalia.

The manufacturers selected for testing have a proven experience record, with multiple installations around the USA similar in size (capacity and number of units) to the ones that will be required for the RWF. The test location will be adjacent to the Digested Sludge Effluent Pump Station (DSEPS) and currently inactive digesters 1 through 4. The Design-Builder’s detailed scope of work associated with the equipment testing will be as follows:
(a) Preparation of a detailed work plan for the centrifuge testing which will include as a minimum the following information:
(1) Centrifuge testing protocol, including the testing methodology, list of parameters to be evaluated, normalized throughput requirements for each unit and sampling procedures (including type, number and frequency of samples to be collected) and health and safety requirements. (2) Details regarding utility connection requirements, trailer dimensions, access to site and support logistics, including roles and responsibilities for City, Design-Builder and Owner’s Advisor staff.
(3) Detailed schedule for the testing.
(4) The work plan will be submitted to the City for review and comments, which will be incorporated into the final plan.
(b) Prepare the site that will be used for the test, including all utility connections for the digested sludge to feed the centrifuge units, utility water connections, centrate return and electrical connections. Provide all piping and appurtenances to connect the sludge feed pipeline at the DSEPS. Water will be supplied by connecting to the existing utility water spigot on the North side of the DSEPS Building, connection will include a backflow preventer. Centrate resulting from the process will be discharged to the DSEPS overflow box.

Electrical service for the testing will be provided by modifying two existing spare buckets on MCC X1X2 with 9200 amps breakers. Upon completion of the centrifuge tests all utilities will be returned to their original condition. (c) Provide all services and work required for the centrifuge testing, including all work related to centrifuge set up, disposal of dewatered cake, completion of activities specified in the testing plan, collection and laboratory analysis of DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-35
3643403.6 042907 CTR
samples (digested sludge feed, dewatered cake, centrate), and daily clean up and housekeeping, as required. Samples of centrate, cake, and digested sludge feed will be analyzed by an independent laboratory in conjunction with tests performed by each centrifuge manufacturer.
(d) Collect all centrifuge testing data for the four manufacturers that will be evaluated. All data collected from the tests, laboratory results, analysis of data and comparison of the equipment performance will be included in a centrifuge testing Technical Memorandum.
(e) Clean and restore the centrifuge test area to its pre-test condition.

Based on the results of the equipment testing, the Design-Builder will establish a baseline for the development of the centrifuge dewatering performance. The Design-Builder will:
(a) Provide recommendations to the City on the expected dewatering performance of the different models of centrifuges.
(b) Conduct a meeting(s) with the City and the Owner’s Advisor to discuss the establishment of the expected centrifuge performance.

Task 2.2.7.2 Deliverables:
 Equipment Testing Plan (Draft and Final)
 Technical Memorandum summarizing results of onsite equipment testing  Technical Memorandum detailing performance investigations and recommended performance requirements
 Meeting minutes from coordination meeting with City and Owner’s Advisor

2.2.7.3 Centrifuge Equipment Selection
A “best value” approach will be used for evaluation and selection of the centrifuge equipment to be used as part of this project. The approach will consider a number of factors with weighting criteria to allow for incorporation of non-cost elements in the selection, while still providing competitive value. The development of the selection process and selection criteria, including weighting and contractual mechanisms, will be done in collaboration with the City including the appropriate representative from the procurement department to ensure that the process meets the City procurement rules. Selection of equipment will include parameters such as:
(a) Experience
(b) Maintenance and Service Capabilities
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-36
3643403.6 042907 CTR
(c) Design Certification
(d) Corporate and Financial Stability
(e) Commercial Terms Acceptance
(f) Conflicts of Interest
(g) Proprietary Information
(h) Quality Control and Assurance
(i) Technical Criteria
(j) Cost
Selection parameters and weighting criteria may be modified, if necessary, to ensure the selection will be representative of the project goals and objectives, minimizing risk to the project. Design of the facility will be completed based on the selected centrifuge manufacturer.

In order to be considered for selection, it is required that a manufacturer participate in the onsite centrifuge testing.

The selection process is anticipated to occur during the development of the 30% design documents. The selection will occur during the Preliminary Services Period and purchase of the selected units will not occur until execution of the Amended and Restated Design-Build Contract. The selection process will include costs to be paid to the selected manufacturer for submittals and design support so that the Design-Builder may access critical design information. Any such costs for information required to be provided during the Preliminary Services Period will be required to be documented in the proposal for selection.

Task 2.2.7.3 Deliverables:
 Draft Equipment Selection Plan
 Final Equipment Selection Specification Package
 Technical Memorandum Documenting selection process
 Meeting minutes from selection review meeting with City and Owner’s Advisor

2.2.7.4 Testing TPAD Sludge and Revisions to Full Acceptance Standards. The parties agree that both laboratory testing and testing with the selected centrifuge, either at full or partial scale, will be conducted on TPAD sludge once the TPAD thickening and digestion processes have stabilized and are producing sludge that is representative of long-term operation conditions. Because stabilized TPAD sludge will not be available until after the DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-37
3643403.6 042907 CTR
Amended and Restated Design-Build Contract is negotiated and executed, such testing with TPAD sludge will occur after the Amended and Restated Design-Build Contract is executed and will be used as the basis for good faith negotiations to change the Full Acceptance Standards, provided that:
(a) The results of laboratory and centrifuge testing of TPAD sludge are in general agreement with one another;
(b) The results of laboratory and centrifuge testing of TPAD sludge differ by at least

0.5 percentage points from the values derived by extrapolations from mesophilic sludge developed during design development; and
(c) The parties mutually agree to such a change.

APPENDIX 9 (Commissioning and Acceptance) describes the process that will be used for testing with TPAD sludge prior to conducting the Acceptance Test (“Centrifuge Confirmation Testing”).

In the event the parties cannot agree to a proposed change to the Full Acceptance Standards, either party may elect to initiate dispute resolution procedures in accordance with Section

12.2Error! Reference source not found. (Non-Binding Mediation) of this Amended and Restated Design-Build Contract.

Task 2.2.7.4 Deliverables:
 Laboratory and centrifuge testing of TPAD sludge results

2.2.8 Regulated Site Conditions – Hazardous Materials (Asbestos, Lead and PCBs)

2.2.8.1 Review of Existing Information. Design-Builder and the City acknowledge that all or portions of the Site, including existing man-made facilities, structures, and features, may contain contaminated and other materials included in the definition of Regulated Site Conditions. The Design-Builder shall meet with the City to fully understand previous use of these areas and the City’s experiences in encountering contaminated materials and conditions during construction of other previous projects.

2.2.8.2 Hazardous Materials (Asbestos, Lead and PCBs) Site Conditions Investigation Plan. The scope of the Design-Builder’s Hazardous Materials site conditions investigations, shall be developed considering the City’s intent to materially reduce the risk of encountering unforeseen Regulated Site Conditions during Construction. The Design-Builder will organize and facilitate a one-hour kickoff conference call with City staff prior to beginning any field work. At the conclusion of the field work, the Design-Builder will facilitate a one-hour DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-38
3643403.6 042907 CTR
progress and results conference call with the City. The Design-Builder’s Regulated Site Conditions Investigation Plan shall identify areas to be surveyed, sampling methods and frequencies, and laboratory testing and analysis methods, and shall be prepared in accordance with all applicable Contract Standards. The scope of the Design-Builder’s investigations include collecting samples to evaluate potential presence of asbestos, lead, and PCBs at the project site. The initial scope of investigations includes collection of up to forty five (45) bulk asbestos samples, twenty six (26) lead paint samples, and twelve (12) bulk PCB samples.

Materials to be sampled in this survey may include concrete, sealants, and paint.

2.2.8.3 Site Conditions Field Investigations and Laboratory Analysis. The Design-Builder shall implement the field investigations and laboratory analysis set forth in its Regulated Site Conditions Investigation Plan. The survey for asbestos shall be performed by a California’s Division of Occupational Safety and Health (“Cal/OSHA”) Certified Asbestos Consultant (CAC) with Hazardous Waste Operations and Emergency Response Standard (HAZWOPER) training, under the direction of a Certified Industrial Hygienist (CIH). The lead survey shall be performed by a California Certified Lead Inspector/Sampling Technician, and Asbestos Consultant/Site Surveillance Technician, and will meet the requirements of the Bay Area Air Quality Management District (BAAQMD). A Project Manager will provide technical oversight on the scope of work, field work, and laboratory analysis. All sample locations will be cleaned up and repaired after sampling. It is estimated that the survey will be completed in 3 working days.

Samples shall be submitted to an accredited laboratory(s) for analysis. Asbestos samples will be analyzed by Polarized Light Microscopy (PLM), lead samples by Atomic Absorption Spectrometry (FlameAA), and PCB samples by EPA Method 8082A. All samples shall be submitted for standard (5-7 days) turnaround.

All work product shall be reviewed by the Project Manager or subject matter expert to ensure that all data is correct and the deliverables meet the City’s objectives, prior to submitting documents to the City for review. Submittals lacking a thorough quality control review will be returned to the Design-Builder without City review, in which case, the submittal will be corrected by the Design-Builder and resubmitted to the City.

All collected data and analysis results shall be included as an appendix to the Regulated Site Conditions and Remediation Report prepared under Task 2.2.8.4.

2.2.8.4 Regulated Site Conditions and Remediation Protocols Report. The Design-Builder shall prepare a draft Regulated Site Conditions and Remediation Protocols DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-39
3643403.6 042907 CTR
Report and provide it to the City for review. The report shall summarize all findings of the field investigation and laboratory analyses, and will include a purpose statement and brief project description; a summary of existing background information; a description of methods used for the survey; results of the survey including observations, sample locations, laboratory results, and quantity estimate; conclusions and recommendations pertaining to the survey findings.

The report will provide general reference of regulations pertaining to the removal of the identified Hazardous Materials.

The Design-Builder shall organize and lead a workshop with the City to review the draft report and to develop final recommendations for mitigation and remediation activities as well as the responsibilities (i.e. City or Design-Builder) and schedule for conducting those activities. If additional testing/work is required as a result of these recommendations, any such additional testing/work, if necessary, shall constitute Additional Preliminary Services, the compensation for which shall be negotiated by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) of this Appendix.

Task 2.2.8 Deliverables:
 Draft and final agenda and draft and final meeting notes for meeting described in Task

2.2.8.1  Draft and final Regulated Site Conditions Investigations Plan  Draft Regulated Site Conditions Investigations and Remediation Protocols Report  Draft Report Review and Remediations Strategies Workshop Agenda, Meeting Materials, and Notes
 Final Regulated Site Conditions Investigations and Remediation Protocols Report

2.2.9 Regulated Site Conditions – Soils Testing
The objective of the specified soils testing is to evaluate the presence of California Administration Manual (CAM) 17 Metals, Volatile Organic Compounds (VOCs), Total Petroleum Hydrocarbons (TPH), Polychlorinated biphenyls (PCBs), organochlorine pesticides, general minerals, ammonia, total coliform, E. coli (MUG), and asbestos (above relevant laboratory reporting limits), in the onsite soils for off-site disposal in accordance with State and federal regulations under the appropriate manifest.

2.2.9.1 Soils Investigation Plan. Prior to implementing the field work, the Design-Builder shall prepare a work plan that describes how the scope of work will be implemented. The work plan shall include exhibits identifying the proposed sampling DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-40
3643403.6 042907 CTR
locations. The total number of samples included in this scope is forty three (43), including four (4) duplicate samples. The four duplicate samples will be collected for quality control and quality assessment purposes. Additional samples may be required along the pipeline corridor or the main dewatering site if analytical results are positive. The work plan will include sampling protocols, decontamination procedures, a site-specific Health and Safety Plan, and field documentation procedures and shall be prepared under the supervision of Professional Geologist, licensed to practice in the State of California.

2.2.9.2 Soil Investigations and Laboratory Analysis. The following items shall be completed by the Design-Builder as part of the soil investigations scope:
(a) Soil borings shall be advanced using hand-auger equipment. Samples will be collected in sleeves to minimize volatilization.
(b) Borings shall be advanced to a depth of approximately five (5) feet below surface grade (bgs) or refusal.
(c) During sampling activities, the soil shall be field screened for total VOCs using a calibrated photoionization detector. Calibration documentation shall be submitted to the City for review.
(d) Non-dedicated sampling equipment shall be cleaned using an Alconox detergent wash and potable water rinse prior to commencement of the sampling activities and between the collection of each sample.
(e) Following completion of sampling activities, the borings shall be backfilled with concrete slurry.

The following aspects shall be considered for the Laboratory analysis:
(f) Soil samples shall be collected per the method specified in the United States Environmental Protection Agency (EPA) Method 5035 in encores. (g) Samples and completed chain-of-custody forms shall be transported to the selected analytical laboratory for seven to ten business day turn-around time for the analysis.
(h) Soil samples shall be analyzed for Metals (CAM-17) by United States Environmental Protection Agency (EPA) Method 6010B, VOCs by EPA Method 8260B, TPH by EPA Method 8015, PCBs with soxhlet extraction by EPA Method 8082, organochlorine pesticides by EPA Method 8081, general chemistry, total coliform, E.Coli, and asbestos.
(i) If analytical results reported are above the established levels, additional soil sampling may be conducted, as directed by the City.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-41
3643403.6 042907 CTR

2.2.9.3 Soils Condition Report. Upon completion of field activities and receipt of laboratory analytical results, a final report shall be prepared by the Design-Builder, which shall include the following:
(a) Documentation of field activities;
(b) A site plan or other exhibits showing pertinent features; (c) Analytical laboratory results;
(d) Data evaluation and presentation of findings;
(e) Recommendations concerning further actions, if necessary; and (f) Draft and final report.

The work shall include a QA/QC program, which is adequate to ensure the delivery of accurate and contextually appropriate technical data and solutions. Practices shall be implemented under the guidance of subject and industry sector practice groups consisting of subject matter experts. Technical oversight, including review of all work products, shall be provided by professionals who have demonstrated proficiency in the pertinent subject matter per the QA/QC program. All work shall be executed under the oversight of a Certified Industrial Hygienist and a Professional Geologist, licensed to practice in the State of California. During the course of the project, conditions may arise that change the Design-Builder’s scope of work hereunder. Any such changes in scope of work, if necessary, shall constitute Additional Preliminary Services, the compensation for which shall be negotiated by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) of this Appendix Task 2.2.9 Deliverables:
 Meeting/Workshop Facilitation Materials and Documentation  Draft and final Work Plan, prior to starting field work  Draft and final site-specific Health and Safety Plan prior to starting field work  Equipment calibration documentation
 Draft and final report
 Draft and final Regulated Soils Conditions Technical Memorandum

2.2.10 Odor Modeling
The Design-Builder will review previous air modeling results (Brown and Caldwell) conducted for the indicative designs and will conduct additional modeling to confirm that the DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-42
3643403.6 042907 CTR
recommended Project concept does not result in materially more adverse odor impacts. The Design-Builder’s model for the Project will be developed using the base model utilized by Brown and Caldwell and will be completed during the development of the 30 percent design documents. The modeling will utilize features of the design developed at the time of the modeling with specific efforts made to include assumptions for the modeling that can be adjusted without significant impact to the model results as the design is advanced in subsequent phases. Initial work associated with model development and review of the existing model will occur during the Preliminary Services Period in order to expedite activities associated with the air permitting activities. The updated model results will be utilized to finalize the permit to construct application to be submitted to the BAAQMD as required.

Specific work to be performed by the Design-Builder shall include:
(a) Air Dispersion Modeling - Air dispersion modeling shall be performed for a single analysis (single model run), consisting of the recommended design concept for the new Digested Sludge Dewatering Building and other odor sources encompassed by the Project The model run will include different “source groups” to determine impact from the Dewatering Facility. (b) Toxic Air Contaminates - Potential air emissions of Toxic Air Contaminants (TACs) shall be calculated using Pooled Emission Estimation Program (PEEP) and Joint Emissions Inventory Program (JEIP) emission factors for the Dewatering Facility sources.
(c) Green House Gasses - Green House Gas (GHG) emission estimates previously performed by the City shall be reviewed to determine if any changes are required based on the final design of the Dewatering Facility. The GHG estimates will be updated based on the final design of the Dewatering Facility, with those factors requiring modifications being identified in a technical memorandum. It is assumed that up to 30% of the estimates will require modification. (d) AERMOD shall be used for the modeling, PEEP shall be used to provide data for input to the model. The odor modeling will be included with the for the BAAQMD permit to construct application. All modeling shall be completed prior to the 30% design submittal.

Task 2.2.10 Deliverables:
 Draft and final Odor Modeling Work Plan
 All electronic modeling files
 Draft and final Technical Memorandum

2.2.11 Options Analysis
Prior to beginning the Basis of Design Report efforts, the Design-Builder shall conduct an Options Analysis in order to evaluate the indicative design(s) against the Design-Builder’s DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-43
3643403.6 042907 CTR
alternative concept. The objective of this Options Analysis is to select the best project approach prior to engaging in the larger efforts undertaken in the Basis of Design Report period. Actions to be carried out by the City and Design-Builder include:
(a) Design-Builder shall conduct additional early workshops. Design-Builder shall prepare agendas, background information, host the workshops, and prepare meeting summaries for the following workshops. Early workshops will be conducted to:
(1) Flows and Loads and Sizing Criteria. The Design-Builder will work with the City to review flows and loads information included in the PDR with the objective of determining whether or not any changes to the flow and load information, especially with respect to imported materials, shall be made prior to proceeding to the Basis of Design. Considering the accepted or refined flow and load information, the Design-Builder will conduct one workshop with the City to review the sizing and redundancy criteria in the Project Definition Report and to determine if any changes are warranted.
(2) Site and Configuration Selection. The Design-Builder will conduct ne workshop to review the indicative design(s) and Design-Builder’s alternative concept, as both may be modified based on any revisions to flow and load or sizing criteria, to reach agreement with the City on the concept to carry forward to the Basis of Design phase, and to confirm or select locations for specific project features.
(3) Project Scope Definition. The Design-Builder shall conduct one workshop to discuss the project requirements identified in the RFP/PDR and the associated operational, technical and cost consequences of each major requirement.
(b) As part of these workshops, the Design-Builder shall update the following for both the alternative concept and at least one of the indicative designs:
(1) Cost Model
(2) City Triple Bottom Line (TBL+) Spreadsheets
(c) At the conclusion of the Options Analysis Period, the City shall select the Project concept to carry forward to the Basis of Design phase and shall provide direction on project scope definition prior to advancing to the Basis of Design phase.

Task 2.2.9 Deliverables:
 Workshop agenda, PowerPoint presentations and meeting minutes  Accompanying drawings, cost model estimates, and TBL+ spreadsheets DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-44
3643403.6 042907 CTR

2.3 PRELIMINARY SERVICES TASK #3 – BASIS OF DESIGN REPORT

2.3.1 Basis of Design Development

2.3.1.1 Concept Refinement. The Design-Builder shall be responsible for developing, refining or modifying the indicative design(s) presented in the PDR in coordination with the City. The Design-Builder shall be responsible for reviewing and commenting on ideas presented in the PDR to improve operability and maintainability and to reduce overall construction costs to bring the Design-Build Cost (as defined in Error! Reference source not found. (prior to amendment by this Amended and Restated Design-Build Contract)) within the City’s approved budget for the Design-Build Price. The Design-Builder shall be responsible for developing alternatives and strategies for Design-Build Cost reduction. The Design-Builder shall conduct all evaluations, hydraulic and process modeling, calculations, cost estimating, scheduling, workshops, and other services as needed to develop the Basis of Design. Each workshop shall include a weighted decision process to compare alternatives on the basis of established evaluation criteria. As a minimum, the following topics shall be covered in these workshops:
(a) Hydraulic Modeling
(b) Process Modeling and Mass Balance
(c) Odor emissions modeling
(d) Process Equipment Selection, including, but not limited to, proposed Minimum Acceptance Standards, Acceptance Standards and Preliminary Centrifuge Acceptance Testing Plan
(e) Phasing Plan (Initial Project, Ultimate Project and Intermediate Phasing if recommended). Analysis may include the use of decision-making tools such as Triple Bottom Line (TBL) Plus or any other type of analysis necessary to support conclusions.
(f) Site and Facilities Planning and Layout
(g) Primary Project components
(h) Site civil engineering design, including paving and grading, storm water management, parking, truck and service access, and piping connections to existing utilities
(i) Landscaping design
(j) Process mechanical design
(k) Electrical supply and distribution design
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-45
3643403.6 042907 CTR
(l) Instrumentation, controls, and DCS design
(m) Architectural and structural design
(n) HVAC, plumbing, and fire protection design
(o) Corrosion control measures
(p) Struvite mitigation measures
(q) Hazardous area classifications
(r) Commissioning, Acceptance Testing, and Transition Services (s) Permitting considerations
(t) Interface with related and nearby projects
The following information shall be prepared by Design-Builder for each workshop, as applicable, and shall be submitted to the Records Management System a minimum of one week prior to each workshop:
(u) Recommended Project Concept
(v) General Operational Strategy
(w) Design criteria, including a mass balance
(x) General site and facilities layout drawings
(y) 3D CAD renderings in accordance with the City drawing requirements set forth in APPENDIX 5 (General Design-Build Work Requirements) and City’s CAD Standards.
(z) O&M considerations
(aa) Construction and life cycle cost estimates for indicative design or alternatives (bb) Schedule considerations
(cc) Constructability analysis
(dd) Commissioning, Acceptance Testing, and Transition Services, including DesignBuilder’s preliminary Centrifuge Acceptance Test Plan for testing the performance of dewatering trains, including centrifuges (see Section 9.3.2 (Required Submittals and Time Frames) of APPENDIX 9 (Commissioning and Acceptance))
(ee) Design-Builder’s recommendations for Design-Build Cost reduction alternatives and strategies
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-46
3643403.6 042907 CTR

2.3.2 Draft Basis of Design Report (BDR).

The Design-Builder shall prepare and submit to the City a draft BDR which will include the Design-Builder’s evaluation findings and specific recommended preliminary design (including preliminary drawings) for the Project. The draft BDR will explain how the proposed preliminary design will meet the City’s budget, performance, operational, and maintenance requirements for the Project and comply with all legal and regulatory requirements. The draft BDR will include information on any alternatives considered and evaluated and information on the rationale or method by which the recommended design was selected. Information considered in the evaluation of alternatives and selection of a recommended design shall include but not be limited to: estimated capital, operations and maintenance costs; reliability, redundancy, robustness, and flexibility of the recommended processes and equipment; ease of City operation and maintenance; capability to expand the facilities and systems to process the ultimate projected digested flows and loads; flexibility, compliance with existing and future regulatory requirements; public safety; and compatibility with California Environmental Quality Act (CEQA) and City environmental objectives and requirements. It will include a draft Initial Design-Build Schedule that is prepared in accordance with Section 5.3 (Design-Build Schedule) of APPENDIX 5 (General Design-Build Work Requirements) that shows:
(a) Preparation and completion of 30% DCD
(b) Preparation and completion of 60% DCD
(c) Preparation and submission of proposal to complete design work from 60% to 100% including preparing final plans and specifications (d) Submission of a 60% design-based GMP and Performance Guarantees (e) Final design integrated with construction, testing and startup and commencement of operations
The draft BDR shall be reviewed by the City and the City’s comments shall be addressed by the Design-Builder.

2.3.2.2 Project Basis and Proposed Performance Guarantees. The final BDR will include information on:
(a) Proposed Full Acceptance Standards (where numeric values are not established as of the Contract Date in APPENDIX 9 (Commissioning and Acceptance)) and associated Performance Guarantees for the selected design. Design-Builder may propose more stringent values for the Minimum Acceptance Standards included in APPENDIX 9 (Commissioning and Acceptance) as of the Contract Date. If the Design-Builder proposes a less stringent value for either the Full Acceptance Standard values or Minimum Acceptance Standard values as of the Contract DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-47
3643403.6 042907 CTR
Date, a detailed rationale and cost-benefit analysis shall be provided to justify the reduced standard.
(b) Digested Sludge Dewatering construction conditions, including existing sites conditions; geotechnical conditions; hazardous materials conditions, flexibility for future installation of other sludge cake processing. (c) Digested Sludge Dewatering vehicular and pedestrian access, parking for the Design-Builder’s workforce and City personnel and egress and materials and equipment staging area locations, size and security.

2.3.2.3 Proposed Digested Sludge Dewatering Facility Design. The DesignBuilder will prepare a BDR representing approximately 15 percent completion of the design.

The BDR will include a 3D Digested Sludge Dewatering Facility model (developed using the City’s CAD Standards), and a description and preliminary schematics, drawings, and specifications of the following design elements:
(a) The Digested Sludge Dewatering Facility layouts, site layouts and proposed design criteria – civil, site development, geotechnical, landscaping, structural, architectural, process mechanical, building mechanical, electrical, and instrumentation and control systems
(b) Proposed equipment and facilities to be constructed; alternatives evaluated, and basis for evaluation and recommended system
(c) Preliminary list of major equipment, including types, configurations, power requirements and potential suppliers
(d) Proposed new facilities operations plan and preliminary control descriptions (e) Proposed preliminary process flow and process and instrumentation diagrams for the Digested Sludge Dewatering Facility system
(f) Equipment vendors proposed, evaluated and recommended (g) Recommendations for redundancy and reliability
(h) Sites plan layout and description of new or altered existing facilities (i) Process diagrams that show devices for measurements and recording (j) Digested Sludge Dewatering Facility control system and DCS interface Comparisons on equipment and vendors shall include technical and performance characteristics, reliability, warranties, delivery lead time and operational experience at other facilities. The BDR will include supporting documentation.

2.3.2.4 Proposed Construction Organization, Work Plan and Schedule. The BDR shall describe:

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-48
3643403.6 042907 CTR
(a) The Design-Builder’s proposed construction organization, including key construction managers and field superintendents, Subcontractors, and allocation of work among the proposed Subcontractors.
(b) The Design-Builder’s proposed work sequence to install and construct the proposed BDR design from commencement of construction to Substantial Completion to Acceptance Testing to Final Completion of the Project. (c) The Design-Builder’s proposed equipment procurement plan and schedule covering longer lead-time items and any items with proprietary configurations/requirements that may impact the design. The procurement plan shall include any recommendations for early procurement of equipment required to achieve schedule milestones and/or to allow the design to be tailored to the selected equipment.
(d) The Design-Builder’s proposed schedule for performing its construction work (e) The Design-Builder’s plan for coordinating with the City’s requirements for other ongoing and normal RWF operations, including calendar dates and durations for anticipated process shutdowns during the construction period. (f) A Digested Sludge Dewatering Facility Site-specific Health and Safety Plan. (g) The Design-Builder’s proposed preliminary Commissioning and Acceptance Test Plan, including dates, durations, test criteria, Project requirements for test conditions, personnel to be provided, and requested City support (see APPENDIX 9 (Commissioning and Acceptance)).
(h) The Design-Builder’s preliminary estimate of cash flow requirements by month from commencement of construction work through Final Completion.

2.3.2.5 Regulatory Requirements. The BDR shall include a description of regulatory conditions that apply to the proposed design, including but not limited to:
(a) Legal restrictions and requirements
(b) Approvals and limitations or constraints
(c) All required permits and constraints, including, but not limited to, those required to be issued by City of San José building, public works, and fire departments, and the BAAQMD. Include all fees and assessments associated with permits and approvals.
(d) The BDR shall include a description of the work to be performed with respect to required permits and approvals and information regarding the Design-Builder’s proposed work activities and implementation and compliance with required CEQA mitigations as set forth in the MMRP, if any.

Anticipated permits required, include but are not limited to those listed in APPENDIX 3 (Governmental Approvals)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-49
3643403.6 042907 CTR

2.3.2.6 Design-Build Cost Estimate Update. The Design-Builder shall include within the BDR a cost estimate update. The Design-Build Cost estimate shall include:
(a) A Class 3 Opinion of Probable Construction Cost (OPCC) (in U.S. dollars) in accordance with standards established by AACEI with supporting materials including assumptions regarding construction conditions, and the bidding climate and bidding/ procurement strategies
(b) Final design costs and other Design-Builder engineering and related costs during construction
(c) Start-up, testing, commissioning and other transition services

2.3.2.7 Projected O&M Costs. The BDR shall include a preliminary estimate of the Digested Sludge Dewatering Facility operations and maintenance costs and staffing requirements. The preliminary estimate shall include:
(a) Preliminary costs for operations and maintenance (including capital maintenance and major repairs and replacements, power, chemicals, and labor) of the proposed completed Project and breakdown of costs, both annually and on a life-cycle basis
(b) Estimated O&M staffing requirements
(c) Major assumptions underlying Projected O&M Costs
(d) Major factors that may influence Projected O&M Costs (e) The Design-Builder shall develop and describe the conceptual life cycle costs as well as a Design-Build Schedule.

Task 2.3.2 Deliverables:
 Draft Basis of Design Report (BDR)
 Estimated Design-Build cost with detailed breakdown
 Estimate O&M cost with detailed breakdown

2.3.3 Basis of Design Review Workshop.

The Design-Builder shall meet with the City staff and City consultants (Program Manager and Owner’s Advisor) to present the preliminary design concepts and discuss comments on the draft BDR and obtain City approval on the recommended alternatives prior to proceeding with 30 percent design. The review workshop shall be held during the 20-Business Day City review and comment period on the draft Basis of Design Report. The Design-Builder shall schedule this review workshop on a date approved by the City, near the mid-point of the City review and comment period.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-50
3643403.6 042907 CTR
Task 2.3.3 Deliverables:
 Meeting agenda, materials, and notes including an update of the design progression log

2.3.4 Final Basis of Design Report.

The Design-Builder shall prepare a final BDR incorporating City comments on the draft BDR.

The report will include updated TMs, as well as table of contents, executive summary, facilities descriptions, preliminary drawings and renderings, design criteria, a mass balance and recommended Project chapters.

Task 2.3.4 Deliverables:
 Final Basis of Design Report (BDR)

2.4 PRELIMINARY SERVICES TASK #4 – 30 PERCENT DESIGN COMPLETION

DOCUMENTS (DCD)

2.4.1 Period of Performance.

After the Design-Builder receives the City’s written notice that the City’s comments, if any, have been satisfactorily addressed in the final BDR, the Design-Builder shall proceed with the performance of services required to achieve 30% Design Completion. The Design-Builder shall submit the Deliverable Material required by the 30% Design Completion Documents (30% DCD) to the City for review.

2.4.2 Minimum Requirements.

The 30% DCD shall follow the City’s CAD Standards and shall include at least the following (where applicable):
(a) Cover Sheet, Location Map and Vicinity Map;
(b) Index of Drawings, general legend, abbreviations;
(c) Design drawings as specified below in Section 2.4.4 (30 Percent Design); (d) 3D renderings of facilities
(e) A Project specifications document including general requirements, site work, materials (concrete, masonry, metals, wood, plastics), thermal and moisture protection, architectural (doors and windows, finishes, interior features), equipment, special construction, mechanical, electrical, and instrumentation and control systems proposed;
(f) Project specific analyses of codes, ordinances and regulations; (g) Preliminary process control narratives
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-51
3643403.6 042907 CTR
(h) Design criteria and mass balances
(i) Detailed lists of equipment, instruments and valves, including types, configuration, power requirements, redundancy requirements and potential suppliers
(j) Preliminary Project Hazard Analysis
(k) Initial construction sequencing plan
(l) Initial construction phasing recommendations (i.e. identification of any Early Works Packages)

2.4.3 Criteria.

The 30% DCD shall incorporate City’s BDR requirements and shall include, in addition to drawings and specifications set forth in this section, such additional information as needed to describe the Project. The 30% DCD shall indicate the basis for design choices, including but not limited to initial costs, lifecycle costs, life expectancy, maintenance considerations, reliability, durability, and applicable requirements of Governmental Bodies having jurisdiction or private licensing, patent, easements, or other legal restrictions, as well as an explanation of how the design incorporates the City’s BDR objectives. The 30% DCD shall indicate any alternative designs, approaches, technologies, equipment or processes that the Design-Builder recommends be considered by the City if not included in the final BDR.

The 30% DCD will take the concepts developed in the BDR and advance them to preliminary engineering drawings and specifications.

2.4.4 30 Percent Design
The 30% DCD will incorporate the recommended systems and layout identified in the BDR into the 30% drawings and specifications. The 30% drawing set will generally include drawings, specifications and technical information described below. (a) General Drawings: Cover sheet, abbreviations and symbols, process schematics, key plan, list of drawings, Digested Sludge Dewatering Facility key plan, drawing symbology, numbering & tagging conventions, symbols, and abbreviations, hydraulic profiles, design criteria and mass balances (90% complete), process flow diagrams, pipe material schedule, equipment schedule, valve and gate schedules, and boundary survey.
(b) Civil Drawings: Digested Sludge Dewatering Facility Site preliminary grading and paving plan, and yard piping plans, including site access/egress and perimeter security measures.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-52
3643403.6 042907 CTR
(c) Architectural Drawings: building code plan, floor plan, exterior elevations.

Preliminary architectural plans and sections for each new building. 3D renderings of facilities shall also be included.
(d) Structural Drawings: General notes, standard concrete details, standard reinforcing details, stair and guardrail details. Preliminary structural plans and sections for each structure.
(e) Mechanical Drawings: Mechanical symbols and legends, and energy compliance forms. Preliminary piping and mechanical plans and sections for each process area and structure. 3D renderings of interior and exterior equipment and systems shall also be included.
(f) Electrical Drawings: Electrical symbols and legends, one-line diagrams, Digested Sludge Dewatering Facility Site electrical plan, lighting and power plan, and load schedules.
(g) P&IDs: Preliminary Process and Instrumentation Diagrams (P&IDs) for all processes. Process and mechanical elements of the P&IDs shall be 75% complete; control aspects shall be 25% complete.
(h) Instrumentation: Legends and symbols, control system block diagrams/network architecture, and preliminary control descriptions. (i) Hazardous Area Classification Drawings: A schedule of hazardous are classifications and design requirements and drawings depicting the extents of the hazardous areas.
(j) Specifications: Preliminary specifications shall be prepared by the DesignBuilder to include a table of contents listing all anticipated specification sections and preliminary specification sections for major equipment items. Major equipment items include items listed below, DCS system, pumps, centrifuges, polymer storage, blending and metering systems, grinders, mixers, fans, truck scales, dewatered cake storage and loadout systems, dewatering cake conveying systems, elevators, cranes, air handling/conditioning units, electrical switchgear, transformers, motor control centers, variable frequency drives, softstart drives, piping, valves. (i) Preliminary control narratives
(ii) Preliminary major equipment schedule
(iii) Preliminary major process equipment specifications (iv) Preliminary piping schedule
(v) Preliminary valve schedule
(vi) Preliminary valve specifications
(vii) Preliminary instrument schedule
(viii) Preliminary instrument specifications
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-53
3643403.6 042907 CTR
(ix) Preliminary power distribution equipment specifications (k) Preliminary Project Process Hazard Analysis
The 30 percent submittal shall include a preliminary Project Process Hazard Analysis (PHA), conducted by a subconsultant specialist, for new processes included in the Project and for any existing processes at the RWF affected by the Project. Preparation of the PHS shall include review of Project documentation, preparation for the preliminary PHA study, facilitation, and preparation of draft and final preliminary PHA study report. The PHA shall be conducted using the City’s Hazard and Operability (HAZOP) methodology. The Design Builder shall conduct a HAZOP workshop with plant staff and process designers to facilitate inclusion of appropriate findings in the PHA and appropriate mitigations into the Project design and operations practices.

A 30 percent design Technical Memorandum shall be prepared by the Design-Builder that includes design criteria for each process, information from the fire marshal and code reviewers, process calculations, preliminary structural, mechanical and electrical calculations. The Technical Memorandum shall also describe connections to the existing Regional Wastewater Facility and public utilities, including power, control and utility connections.

The Design-Builder shall also provide an update of the Class 3 Estimated Design-Build Cost at the completion of the 30% Design.

Task 2.4.4 Deliverables:
 Draft and Final 30% DCD (including design drawings, specifications, preliminary PHA, and Technical Memorandum)

2.4.5 Corrosion Engineering.

The Design-Builder’s corrosion experts shall review the findings of the geotechnical investigation, conduct additional sampling and testing as needed, and develop details and specifications for corrosion protection systems for the pipelines, equipment, and other items potentially subject to corrosion such as grating and guardrails. This assessment shall include potential corrosivity of soil and groundwater as well as corrosion that may result from corrosive atmospheric conditions or exposure to corrosive fluids. The following items are included in this Preliminary Services Task:

2.4.5.1 Digested Sludge Dewatering Facility Sites Corrosivity Assessment. The Design-Builder’s corrosion engineers shall review the soil sample chemical analysis from the DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-54
3643403.6 042907 CTR
geotechnical consultant. The soil samples shall have been analyzed for pH, chlorides, sulfates, resistivity, and Redox potential. Additional analysis shall include the following at a minimum:
(a) Conduct in-situ soil resistivities at selected locations throughout the Digested Sludge Dewatering Facility Sites using the Wenner 4-pin technique. In-situ resistivities will be measured at 2.5-, 5-, 7.5-, 10-, and 15-foot depths using a suitable Resistivity Meter. Barnes layer calculations will be performed to determine the corrosivity of the different soil layers to the proposed pipeline materials.
(b) Review the plans and specifications for the Project prepared by the DesignBuilder for construction details and proposed materials and determine the suitability of the proposed materials based on the collected field and laboratory data and expected atmospheric conditions.
(c) Prepare a TM that provides a summary of the field data collected along with the chemical analysis of the soil samples and an analysis of this data and recommendations for protection of project elements expected to be exposed to corrosive atmospheric conditions and fluids. The potential for corrosion on the new process pipelines, equipment, structures and other project elements shall be determined based on the analysis and recommendations for the long-term prevention of corrosion. All fieldwork and recommendations shall be in compliance with applicable National Association of Corrosion Engineers (NACE) and City standards. The TM shall also contain the design criteria for the proposed corrosion prevention systems for other metal systems and other systems and facilities that could incur corrosion.
(d) Prepare drawings and specifications for the recommended corrosion protection systems developed as part of the TM.

Task 2.4.5 Deliverables:
 Draft and final Corrosion Control Technical Memorandum

2.4.6 30 Percent Design Workshop.

A one-day workshop shall be conducted by the Design-Builder after the City reviews the 30% Design Documents. A log of review comments shall be maintained to ensure all design comments are addressed and incorporated into the 60 percent design, as appropriate. The review workshop shall be held during the 20-Business Day City review and comment period on the draft Basis of Design Report. The Design-Builder shall schedule this review workshop on a date approved by the City, near the mid-point of the City review and comment period.

Task 2.4.6 Deliverables:
 Meeting agenda, materials, notes, action items and review comments log DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-55
3643403.6 042907 CTR

2.4.7 Updated Estimated Design-Build Cost.

The Design-Builder shall update its preliminary cost model presented in the BDR for the Project. The updated Project 30% DCD cost model shall be Class 3 in accordance with AACEI standards and shall include estimated costs for all services, equipment and materials and other fees that may be incurred by the Project including appropriate contingencies due to uncertainties regarding cost estimates, site conditions and other factors. The updated cost model shall be broken down into logical cost categories such as remaining design services, engineering services during construction, start up and testing, construction work, major equipment purchases, major material purchases and other categories with appropriate supporting documentation that will assist the City in its evaluation of the Design-Build Cost estimate.

Task 2.4.7 Deliverables:
 Updated Estimated Design-Build Cost

2.4.8 Updated Initial Design-Build Schedule.

The Design-Builder shall update its Initial Design-Build Schedule for the Design-Build Work presented in the BDR. The updated Initial Design-Build Schedule shall indicate key milestone dates for work completion from the final 30% DCD through start up, testing and Final Completion. The schedule shall provide for adequate periods for City design and Definitive Project Submittal reviews and for the Design-Builder to make revisions and obtain written notice to proceed from the City before proceeding with the next work phase. The updated Initial Design-Build Schedule shall be accompanied by a memo or report that explains significant changes from the BDR for key activities and Project milestones.

Task 2.4.8 Deliverables:
 Updated Initial Design-Build Schedule

2.4.9 City Review.

The City shall review the 30% DCD and provide the Design-Builder with written review comments. The Design-Builder shall make such revisions as required in order to address the City’s comments. The City shall notify the Design-Builder in writing after the City has determined that revisions made by the Design-Builder are acceptable.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-56
3643403.6 042907 CTR

2.5 PRELIMINARY SERVICES TASK #5 – 60 PERCENT DESIGN COMPLETION

DOCUMENTS (DCD)

2.5.1 Inclusion of the Technical Specifications.

After acceptance by City of Design-Builder’s 30% Design Completion Documents (DCD), the Design-Builder shall proceed with the performance of the Base Preliminary Services required to achieve 60% Design Completion. Upon the City’s written notification that all the City’s comments, if any, have been satisfactorily addressed by the Design-Builder, the completed 60% DCD shall be included as the Technical Specifications in APPENDIX 4 (Technical Specifications).

2.5.2 60% DCD Deliverables.

The 60% DCD shall consist of CAD generated drawings, 3D renderings and specifications covering general civil and site work improvements, paving and grading, yard piping and electrical work, landscaping, design criteria and mass balances, and process flow diagrams, , process and instrumentation diagrams (P&IDs) and designs of foundations, architecture, structures, process mechanical systems, HVAC, plumbing, electrical systems, and instrumentation and controls systems. The 60% DCD shall include layouts and schematics drawn to scale, design criteria and notes showing the proposed design of all new and modified existing facilities, in sufficient detail to cover the complete Project. The 60% DCD shall include all major elements of the Project design proposed for construction which complies with the final 30% DCD. The 60% CAD drawings shall follow the City’s CAD Standards.

2.5.3 Minimum Requirements.

The deliverables will be nominally 60% complete at this stage, but certain elements of the design shall be more than 60% complete for the 60% DCD deliverable. The 60% DCD deliverable shall include drawings, renderings, specifications and other technical information with levels of completeness as follows:
(a) General Drawings:
(i) cover sheet, abbreviations and symbols, process schematics, key plan, list of drawings (90% complete)
(ii) digested Sludge Dewatering Facility key plan (90% complete) (iii) drawing symbology, numbering & tagging conventions, symbols, and abbreviations (90% complete)
(iv) hydraulic profiles, design criteria and mass balances (100% complete) DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-57
3643403.6 042907 CTR
(v) process flow diagrams, pipe material schedule, equipment schedule, valve and gate schedules, and boundary survey (100% complete) (b) Civil Drawings: Digested Sludge Dewatering Facility Site preliminary grading and paving plan, and yard piping plans, including site access/egress and perimeter security measures. (60% complete)
(c) Architectural Drawings: building code plan, floor plan, exterior elevations.

Preliminary architectural plans and sections for each new building. 3D renderings of facilities shall also be included. (60% complete) (d) Structural Drawings: General notes, standard concrete details, standard reinforcing details, stair and guardrail details. Preliminary structural plans and sections for each structure. (60% complete)
(e) Mechanical Drawings: Mechanical symbols and legends, and energy compliance forms. Preliminary piping and mechanical plans and sections for each process area and structure. 3D renderings of interior and exterior equipment and systems shall also be included. (60% complete)
(f) Electrical Drawings:
(i) Electrical symbols and legends, one-line diagrams (100% complete) (ii) site electrical plan, lighting and power plan, and load schedules (40% complete)
(g) P&IDs: Preliminary Process and Instrumentation Diagrams (P&IDs) for all processes (100% complete)
(h) Instrumentation:
(i) Legends and symbols (100% complete)
(ii) control system block diagrams/network and architecture (100% complete)
(iii) locations of input/output panels, controllers, terminals, DCUs, and monitors, (100% complete)
(iv) fiber optic routing & patch panel locations for DCS, CCTV/security, fire alarm, telephones, radio, City internet (number of work stations, nodes and licenses needed) & number of spares for future growth. Fiber optic cable redundancy plan for Zanker Road crossings (100% complete) (i) Hazardous Area Classification Drawings: A schedule of hazardous are classifications and design requirements and drawings depicting the extents of the hazardous areas (60% complete)
(j) Specifications: Specifications shall be in accordance with the most recent edition of the Construction Specification Institute conventions, with Part 2 Products of each section completed, describing the size, character and quality of the entire Project in its essentials as to kinds and locations of materials; DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-58
3643403.6 042907 CTR
equipment selections; and types of structural, mechanical and electrical systems. Specifications shall include:
(i) Control narratives (100% complete)
(ii) Major equipment schedule (100% complete)
(iii) Major process equipment specifications (100% complete) (iv) Piping schedule (90% complete)
(v) Valve schedule (90% complete)
(vi) Valve specifications (100% complete)
(vii) Instrument schedule (100% complete)
(viii) Instrument specifications (100% complete)
(ix) Power distribution equipment specifications (100% complete) (x) Distributed control system equipment and devices (100% complete) (xi) Other specifications, including general requirements, site work, materials (concrete, masonry, metals, wood, plastics), thermal and moisture protection, architectural (doors and windows, finishes, interior features), equipment, special construction, mechanical, electrical, and instrumentation and control systems proposed, the most recent edition of the Construction Specification Institute conventions, with Part 2 Products of each section completed, describing the size, character and quality of the entire Project in its essentials as to kinds and locations of materials; equipment selections; and types of structural, mechanical and electrical systems (50% complete)
The 60% DCD deliverable also shall include the following:
(k) Engineering calculations for certain disciplines, as agreed with City; (l) Project specific analyses of codes, ordinances and regulations; (m) List of Project Interfaces, both receiving and providing, and timelines; (n) Two dimensional drawings and three dimensional drawing of major structures, and equipment installations;
(o) List of Process Shutdown Requests and timelines; and (p) Updated construction phasing (i.e. Early Works Packages) recommendations.

Task 2.4.4 Deliverables:
 Draft and final 60% DCD drawings, renderings and specifications DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-59
3643403.6 042907 CTR
 Calculations and other analyses supporting the 60% DCD

2.5.4 Criteria.

The 60% DCD shall incorporate the final 30% DCD and shall include in addition to drawings and specifications set forth in this section such additional information as needed to describe the Project. The 60% DCD shall indicate the basis for design choices, including but not limited to updated initial costs, lifecycle costs, life expectancy, maintenance considerations, reliability, redundancy, durability, and applicable requirements of Governmental Bodies having jurisdiction or private licensing, patent, easements, or other legal restrictions, as well as an explanation of how the design incorporates the City’s BDR objectives. The 60% DCD shall indicate any new alternative designs, approaches, technologies, equipment or processes that the Design-Builder recommends be considered by the City if not included in the final 30% DCD.

Task 2.5.4 Deliverables:
 Updated design criteria document

2.5.5 Updated Design-Build Cost Model.

The Design-Builder shall update its Design-Build Cost Model presented in the BDR and updated at the 30% design completion for the Project. The updated Project 60% DCD DesignBuild Cost Model shall be Class 2 in accordance with AACEI standards and shall include estimated costs for all services, equipment and materials and other fees that may be incurred by the Project including appropriate contingencies due to uncertainties regarding cost estimates, site conditions and other factors. The updated cost model shall be broken down into logical cost categories such as remaining design services, engineering services during construction, start up and testing, self-performed contractor work, procured Subcontractor work, major equipment purchases (engine generators, piping, etc.), major material purchases and other categories with appropriate supporting documentation that will assist the City in its evaluation of the Project cost model.

Task 2.5.5 Deliverables:
 Updated Design-Build Cost Model

2.5.6 Updated Design-Build Schedule.

The Design-Builder shall update its Design-Build Schedule presented in the 30% DCD. The updated Initial Design-Build Schedule shall indicate key milestone dates for work completion from the final 60% DCD through Commissioning, Acceptance Testing and Final Completion.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-60
3643403.6 042907 CTR
The updated Initial Design-Build Schedule shall provide for adequate periods for City design reviews through 100% completion and for the Design-Builder to make revisions and obtain written notification to proceed from the City before proceeding with the next work phase. The updated Initial Design-Build Schedule shall be accompanied by a memo or report that explains significant changes from the 30% DCD for key activities and Project milestones. Upon the City’s written approval, the updated Design-Build Schedule shall be the schedule intended to be included as the “Initial Design-Build Schedule” to be set forth as Attachment 5B (Initial Design-Build Schedule) to APPENDIX 5 (General Design-Build Work Requirements) of this Amended and Restated Design-Build Contract. In addition, the Scheduled Acceptance Date specified in the Design-Build Schedule shall be the date intended to be included in Section 1.1 (Definitions) of this Amended and Restated Design-Build Contract.

Task 2.5.6 Deliverables:
 Updated Design-Build Schedule

2.5.7 Required Permits and Approvals.

In accordance with Section 2.1.7 (Permits and Approvals Plan) of this Appendix, the DesignBuilder shall produce a Permits and Approvals Plan that identifies all necessary information, applications, permits, documents and forms, as may be required by State, City, County, utilities, private authorities with jurisdiction, and other regulatory and permitting agencies, required to secure the Governmental Approvals necessary to perform the work shown in the 60% DCD. This Preliminary Services Task shall apply to City, County and State requirements, as well as other federal, State, local, and special City or other regulatory requirements. Upon the City’s written approval, Governmental Approvals identified by the Design-Builder (including Governmental Approval Application Dates and Assumed Approval Issuance Dates) shall be the Governmental Approvals intended to be included in Table 3-1 (Governmental Approvals Responsibility) and Table 3-2 (Governmental Approvals Schedule) of APPENDIX 3 (Governmental Approvals).

Task 2.5.7 Deliverables:
 Updated Permits and Approvals Plan

2.5.8 Performance Guarantees.

The Design-Builder shall specify the City-approved quality characteristics to which the Digested Sludge Dewatering Facility will operate (the “Quality Standards”) in comparison to standard industry practice. The Quality Standards shall include, but not be limited to, the Minimum Acceptance Standards and Acceptance Standards identified in APPENDIX 9 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-61
3643403.6 042907 CTR
(Commissioning and Acceptance). Values for those standards shall be approved by the City.

City operation and maintenance requirements shall also be identified by the Design-Builder.

Upon the City’s written approval, the Minimum Acceptance Standards, Acceptance Standards, and associated Performance Guarantees in APPENDIX 9 (Commissioning and Acceptance) shall be established, modified, or accepted by the Design-Builder and the Design-Builder shall prepare a modified APPENDIX 9 (Commissioning and Acceptance) for inclusion in the Amended and Restated Design-Build Contract.

2.5.9 Training Plan Requirements.

The Design-Builder shall develop a Training Plan in accordance with the Contract Standards.

The City’s approval of the Training Plan shall be a condition precedent to the achievement of Substantial Completion. The Training Plan shall:
(a) include a combination of classroom and field/maintenance shop training; (b) be designed to completely train City staff to competently operate and maintain the Digested Sludge Dewatering Facility with the systems theory, sequence of operations, component and functional descriptions, standard operating procedures, hazard analysis of equipment, safety features, emergency procedures, assembly, disassembly, preventive, corrective and predictive maintenance, internal and external wiring, control loop, schematics and diagrams of all components;
(c) list all equipment and systems in the Digested Sludge Dewatering Facility, including the following information for each equipment package or system:
(1) a description of each equipment package or system with reference to technical specifications or drawings if applicable;
(2) identification of target audiences (i.e. operators, mechanical maintenance, electrical maintenance, instrumentation maintenance); (3) duration of classroom training for each session and each audience; and (4) duration of hands-on training for each session and each audience; (d) include the number, qualifications and certification levels of City staff; and (e) establish the hours of training that will be provided prior to the Acceptance Date and, if necessary, any further training that will be provided during the Transition Period.

Task 2.5.9 Deliverables:
 Draft and final Training Plan
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-62
3643403.6 042907 CTR

2.5.10 Draft Maintenance of Operations During Construction Plan.

Pursuant to Section 6.11(A) (Maintenance of Operations During Construction) of this Amended and Restated Design-Build Contract, the Design-Builder shall prepare a draft Maintenance of Operations During Construction Plan which identifies the plan and procedures for coordinating with the City’s requirements for ongoing operations of the Regional Wastewater Facility.

Task 2.5.10 Deliverables:
 Draft Maintenance of Operations During Construction Plan

2.5.11 City Review.

The City shall review the 60% DCD and provide the Design-Builder with written review comments. The Design-Builder shall make such revisions as required in order to address the City’s comments. The City shall indicate to the Design-Builder in writing after the City has determined that revisions made by the Design-Builder are acceptable.

2.5.12 60 Percent Design Workshop.

A 60 percent design workshop will be conducted after the City reviews the 60% DCD. This workshop will be used to finalize the design comments. A log of review comments will be maintained to assure all design comments are addressed and incorporated, if appropriate. The review workshop shall be held during the 20-Business Day City review and comment period on the draft Basis of Design Report. The Design-Builder shall schedule this review workshop on a date approved by the City, near the mid-point of the City review and comment period.

Task 2.5.12 Deliverables:
 Meeting agenda, materials, notes, action items and review comments log

2.6 PRELIMINARY SERVICES TASK #6 – DEFINITIVE PROJECT SUBMITTAL AND

SUPPORTING COST ESTIMATES

2.6.1 Definitive Project Submittal.

After the Design-Builder has received the City’s written notification that its comments have been satisfactorily addressed in the revised 60% DCD, Design-Builder shall provide the City with a Definitive Project Submittal, which shall be prepared in accordance with the Contract Standards and meet the requirements set forth in Section 5.9 (Definitive Project Submittal) of the Design-Build Contract (prior to amendment by this Amended and Restated Design-Build Contract).

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-63
3643403.6 042907 CTR
The Definitive Project Submittal shall incorporate all of the work performed as part of Preliminary Services Task 5, set forth the proposed Base Guaranteed Maximum Price (as defined in Error! Reference source not found. (prior to amendment by this Amended and Restated Design-Build Contract)) for the Design-Build Work (including all services required for construction of the Project through Commissioning, Acceptance Testing and Final Completion), and provide information on all engineering, procurement, materials, construction labor and equipment and other services necessary to perform the Design-Build Work as required under this Amended and Restated Design-Build Contract. As part of its Definitive Project Submittal, the Design-Builder shall submit a final Subcontracting Plan and a final Design-Build Schedule that meets the requirements set forth in Section 5.3 (Design-Build Schedule) of APPENDIX 5 (General Design-Build Work Requirements).

2.6.2 Basis of the Proposed Base Guaranteed Maximum Price.

The Design-Builder will prepare and include in the Definitive Project Submittal documentation supporting the proposed Base Guaranteed Maximum Price, including Subcontractor and equipment vendor bids and quotations, detailed cost estimating data, allowances (where appropriate), breakdown of general conditions, and definition of the Design-Builder’s contingency included in the Base Guaranteed Maximum Price. Such documentation will include the following information:
(a) Engineering services, including:
(1) Engineering design from 60% to 100% to be based on firm proposal. (2) Engineering design – value engineering services
(3) Engineering construction support
(4) Engineering start up, testing and Digested Sludge Dewatering Facility commissioning
(5) Engineering services in support of procurement of major equipment (6) Training and documentation
(b) Construction services and costs for:
(1) Services during engineering design from 60% to 100% (2) Construction support for value engineering
(3) General conditions
(4) Site work, road improvements and traffic control
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-64
3643403.6 042907 CTR
(5) Yard piping and electrical
(6) Landscaping
(7) Structural and architectural
(8) Electrical and instrumentation
(9) Control system programming
(10) Piping and mechanical
(11) Other construction work not listed above
(12) Waste disposal systems for sanitary wastes and spent chemicals (13) Commissioning and Acceptance Testing
(14) Performance and payment bonds
(15) Contingency
(c) Labor, expenses, rental, overhead and mark-up costs, including:
(1) Billing rates for all proposed classifications of engineering and construction services labor and related expense rates such as mileage charges, per diem for meals and lodging, office charges and personnel vehicle rentals;
(2) Unburdened rental rates on construction equipment, trailers, storage containers or space and major tools;
(3) Direct overhead on labor (benefits), indirect overhead on labor (general and administration or G&A), and profit rate on fully cost burdened labor rates;
(4) Proposed overhead markup rates and profit rates on expenses, materials, equipment rentals, Subcontractors, equipment supplied by vendors and consumables (supplies);
(5) The same cost and pricing information as requested in paragraphs 3 (a), (b) and (c) above for major Subcontractors; and
(6) Demonstrate that there are no significant tiered pricing markups so that major Subcontractors’ overhead and profit markups are not duplicated to similar Design-Builder markups.
(d) Design-Builder shall also provide the following information:
(1) For engineering field services during construction, labor costs and expenses for a construction manager or resident engineer for overseeing construction work and related services;
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-65
3643403.6 042907 CTR
(2) For engineering support during construction for review of construction Requests for Information (“RFIs”), submittals and proposed design or construction changes and costs, labor costs and expenses; (3) All Base Guaranteed Maximum Price pricing assumptions and clarifications on terms and conditions used;
(4) All self-performed construction services;
(5) A breakdown of the Design-Builder Contingency (as defined in Error! Reference source not found. (prior to amendment by this Amended and Restated Design-Build Contract)), how it was determined and expected adequacy to cover costs not able to be determined accurately at the time of preparation of the Definitive Project Submittal.
(6) A list of work activities, expenses and fees not included in the GMP which the City may be expected to pay for;
(7) Key assumptions in the 60% DCD Work Schedule upon which the Base Guaranteed Maximum Price is based including dates for Substantial Completion and Final Completion; and
(8) Any other key assumptions or conditions upon which the Base Guaranteed Maximum Price is based not covered in the preceding items in this section.

2.6.3 Preparation of the Definitive Project Submittal.

The Design-Builder shall start the development of the Definitive Project Submittal at the onset of the Project during the kick-off partnering meeting to establish dialogue from early concept development through the 60% design. During the design phase, the Design-Builder will maintain ongoing communication with the City to assess and analyze concept and design changes as they relate to the overall Project cost and schedule.

The Design-Builder shall use an “open book” approach to develop the Definitive Project Submittal, providing the City with full access to all the details and sources of information that make up the final Definitive Project Submittal.

Meetings will be held throughout the design and development of the Definitive Project Submittal with the City to assure the design and preconstruction phase work is completed in a transparent manner.

The Project will not have 100% complete plans and specifications at the time the final Base Guaranteed Maximum Price is agreed upon. Therefore, in order to get a more complete estimate of the scope, the Design-Builder will prepare “design gap analysis narratives” for all DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-66
3643403.6 042907 CTR
work items to provide the Design-Builder’s estimators and the City a clearer picture of what is included in the final Definitive Project Submittal package.

During development of the Definitive Project Submittal, the Design-Builder will perform value analysis and constructability reviews with design and construction team members as the plans are being prepared. The Design-Builder will also conduct “operability reviews” with the Digested Sludge Dewatering plant operations staff, and “bid-ability” reviews with the DesignBuilder’s estimators.

All of these efforts are designed to prepare the documents and estimates as accurately as possible and to keep the City fully informed and involved with the design and cost throughout the development of the Definitive Project Submittal.

At a minimum, the Definitive Project Submittal shall include all items included in the 60% DCD deliverables.

Task 2.6.3 Deliverables:
 Draft and final Definitive Project Submittal
 Meeting agendas and notes

2.6.4 Definitive Project Submittal Workshop.

After delivery of the draft Definitive Project Submittal, the Design-Builder shall meet with the City and its consultants during a 4-hour workshop to present, review, and answer questions about the content of the Definitive Project Submittal. The Design-Builder shall finalize the Definitive Project Submittal after the workshop and re-submit it to the City for final review and approval.

Task 2.6.4 Deliverables:
 Definitive Project Submittal Workshop Agenda, materials, meeting notes and action items

2.7 PRELIMINARY SERVICES TASK #7 ADDITIONAL PRELIMINARY SERVICES As provided in Section 5.2(B) (Additional Preliminary Services) of the Design-Build Contract (prior to amendment by this Amended and Restated Design-Build Contract), the City may request that the Design-Builder perform Additional Preliminary Services. The City has included a City-controlled allowance of $749,256 for as-needed Additional Preliminary Services.

The Design-Builder shall not be entitled to payment of any portion of such City-controlled allowance prior to the completion of negotiations of the compensation for any Additional DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-67
3643403.6 042907 CTR
Preliminary Services by the parties as set forth in Section 2.8.3 (Compensation for Additional Preliminary Services) of this Appendix. Any remaining amount in the City-controlled allowance at the completion of the Preliminary Services Period shall be for the account of the City.

Additional Preliminary Services that have been requested and authorized by the City include the following:
(a) Mandrel existing conduits
(b) Additional geotechnical services
(c) Digested sludge storage tank and pump station design criteria modifications (d) Extended Preliminary Services to account for additional meetings, additional design alternatives analysis, and schedule extensions
(e) Re-design associated with digested sludge tank area and centrate pump station (f) Additional subsurface utility investigation
(g) Additional Health Risk Assessment (HRA) Modeling Efforts Associated with Bay Area Air Quality Management District (BAAQMD) Permitting

2.8 PRELIMINARY SERVICES FEE

2.8.1 Compensation for Base Preliminary Services.

The City shall pay the Design-Builder a Preliminary Services Fee in the amount of $7,492,564.

The Preliminary Services Fee shall serve as the Design-Builder’s entire compensation for all Base Preliminary Services performed as required under this Amended and Restated DesignBuild Contract, and shall include costs for any and all out-of-pocket disbursements for travel, lodging and other expenses incidental to the performance of the Preliminary Services and any payments to third parties such as Subcontractors.

The Design-Builder shall earn its Preliminary Services Fee progressively based upon the Design-Builder’s percentage completion of the Base Preliminary Services as reasonably determined by the City, based on the following values:

Preliminary Services Task Value
Task #1: Project Management $678,120
Task #2: Preliminary Investigations $1,971,734
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-68
3643403.6 042907 CTR
Task #3: Basis of Design Report $973,430
Task #4: 30% Design Completion Documents $1,477,720
Task #5: 60% Design Completion Documents $1,647,620
Task #6: Definitive Project Submittal and Supporting Cost Estimates and Preparation of Formal Proposal to Complete Designs to 100%
$743,940
Total Preliminary Services Payment $7,492,564
Task #7: City-Controlled Allowance for As-Needed Optional Additional Preliminary Services (not included in Base
Preliminary Services Fee)
$749,256

2.8.2 Payment Requests
The Design-Builder shall request monthly progress payments of the portion of the Preliminary Services Fee payable with respect to each Preliminary Services Task. All billings and requests for progress payments shall require a written invoice from the Design-Builder in a form acceptable to the City. The Design-Builder shall submit all billings with any necessary invoices, time records, Preliminary Services Deliverable Material, and other appropriate evidence of performance, after which the City shall make payment at the earliest practicable time, but not later than 30 days following receipt of a proper payment request.

If requested by the City to facilitate the payment process and track progress of the Preliminary Services Tasks, the Design-Builder shall provide the City with an itemization of its compensation according to a Work Breakdown Structure (“WBS”) in a form the City supplies or approves (at the City’s option), that defines all Preliminary Services Tasks (Design-Builder’s and Subcontractors’), along with a Preliminary Services Schedule providing the timeline for each Preliminary Services Task, a Project budget defining the planned man-hours and costs for each Preliminary Services Task, and a schedule of deliverables providing the timeline for all Preliminary Services Deliverable Material to be provided to the City. The WBS shall further define which tasks are to be performed by Subcontractors. The WBS shall not relieve the Design-Builder of its performance, schedule or other obligations under this Amended and Restated Design-Build Contract.

2.8.3 Compensation for Additional Preliminary Services.

Additional Preliminary Services shall be negotiated by the City and the Design-Builder in accordance with Section 5.3(B) (Compensation for Additional Preliminary Services) of the Design-Build Contract (prior to amendment by this Amended and Restated Design-Build DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 2
Santa Clara Regional Wastewater Facility Preliminary Services A2-69
3643403.6 042907 CTR
Contract). The negotiation of the wages or salaries of Design-Builder or Subcontractor personnel performing any such Additional Preliminary Services have been based on those rates set forth in Attachment 8B (Design-Builder's Personnel Cost Schedule) to Error! Reference source not found. (prior to amendment by this Amended and Restated Design-Build Contract).

The following table describes the agreed-to compensation for each Additional Preliminary Services task:

Additional Preliminary Services
Task
Compensation Type Amount
Mandrel existing conduits Time and Materials,
Not-to-Exceed
$57,236.75
Additional geotechnical services Time and Materials,
Not-to-Exceed
$24,850.50
Digested sludge storage tank and
pump station design criteria
modifications
Time and Materials,
Not-to-Exceed
$46,115
Extended Preliminary Services Lump Sum $452,989.65
Re-design associated with
digested sludge tank area and
centrate pump station
Lump Sum $110,000
Additional subsurface utility
investigation
Lump Sum $29,057.10
Additional HRA Modeling Efforts
Associated with BAAQMD
Permitting
Time and Materials,
Not-to-Exceed
$19,007
Total Additional Preliminary
Services Compensation
$749,256

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 2A

INITIAL PRELIMINARY SERVICES SCHEDULE
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 2
Dewatering Facility at the San Jose- Attachment 2A
Santa Clara Regional Wastewater Facility Initial Preliminary Services Schedule 3643403.6 042907 CTR
ATTACHMENT 2A

INITIAL PRELIMINARY SERVICES SCHEDULE
All activities of the Preliminary Services shall be scheduled and monitored by use of a Gantt or Bar Chart which presents all tasks and key subtasks in a logical and efficient work sequence that the Design-Builder intends to use in advancing the Project to the 60% Design stage. The initial Preliminary Services Schedule is to be approved by the City prior to execution of the Design-Build Contract.
[INTENTIONALLY OMITTED]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 2B

LIST OF MEETINGS
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 2
Dewatering Facility at the San Jose- Attachment 2B
Santa Clara Regional Wastewater Facility List of Meetings 3643403.6 042907 CTR
ATTACHMENT 2B

LIST OF MEETINGS
[INTENTIONALLY OMITTED]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
APPENDIX 3

GOVERNMENTAL APPROVALS
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A3-1
3643403.6 042907 CTR
APPENDIX 3

GOVERNMENTAL APPROVALS

3.1 PURPOSE
The purpose of this Appendix is to provide a list of the Governmental Approvals that are expected to be required with respect to the Contract Services. Table 3-1 identifies permits and approvals that are the City’s responsibility. The Design-Builder will be responsible for obtaining all permits and approvals not expressly identified as City responsibility as defined in Table 3-1, as well as all other Governmental Approvals required with respect to the Contract Services irrespective of whether any such Governmental Approval is identified in this Appendix.

Design-Builder shall meet all environmental and permit mitigation requirements set forth in these Governmental Approvals and in this Amended and Restated Design-Build Contract.

3.2 GOVERNMENTAL APPROVALS
The purpose of Table 3-1 is to indicate the responsibility of the Design-Builder and the City with respect to Governmental Approval application management and fee payment. The purpose of Table 3-2 is to indicate assumed approval and issuance dates of the Governmental Approvals in order to determine schedule relief under subsections 6.5(D) (Adjustment to Scheduled Acceptance Date Based on Delays Affecting Design-Builder Managed Governmental Approvals) and 6.5(E) (Adjustment to Scheduled Acceptance Date Based on Delays Affecting City Managed Governmental Approvals) of this Amended and Restated Design-Build Contract.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-2
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment Responsibility Status

1. Stormwater
Pollution
Control:

Construction
General Permit
(CGP)
State
Water
Resources
Control
Board
(SWRCB)
City City Design-Builder: The Design-Builder
shall prepare a Stormwater Pollution
Prevention Plan (SWPPP) and the
necessary Project Registration
Documents (PRD) to be digitally filed
with the SWRCB through the Storm
water Multi-Application and Report
Tracking System (SMARTS
database). The Design-Builder shall
perform the role of "Qualified SWPPP
Developer" (QSD) and "Qualified
SWPPP Practitioner" (QSP).

Design-Builder Permit for the
main dewatering
site was obtained
by the City to
support Early
Work Package
Work.

City responsible
for any additional
Construction
General Permit
required for work
on main plant
site.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-3
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

2. Construction
Safety Permits
Cal/OSHA DesignBuilder DesignBuilder Design-Builder: The Design-Builder is also responsible for permits
related to trench safety and
underground safety, whether or not
the permits are identified in this
table.

Design-Builder Design-Builder
obtained safety
permits for the
Early Work
Package Work
and is
responsible for
obtaining any
additional safety
permits required
for work under
the Amended and
Restated DesignBuild Contract.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-4
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

3. Fire
Department
Permits and
Inspections
City of
San José -
Fire
Departme
nts
City DesignBuilder Design-Builder: The Design-Builder
will be responsible for plan check
review (including City Fire Marshal
Review). Fire Marshal Review
includes Hazmat, Fire Suppression,
Architectural, Fire Alarm and
Underground.

Design-Builder information supply
responsibilities also extend to
information required for:
- Approval of fire access
- Approval of fire water system
design
- Approval of fire alarm and
suppression system design
- Variance for clean agent
(waterless) fire suppression
- Hazardous Materials
construction permit
Design-Builder Design-Builder
will obtain based
on 100% design
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-5
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

4. Building
Permits
Structural
Engineeri
ng and
Code
Inspection
Architectu
ral Review
City of
San Jose,
City
Council/Pl
anning
Building
and Code
Enforceme
nt
Departme
nt
City City Design-Builder: The Design-Builder
will be responsible for plan check
review.

Design-Builder information supply
responsibilities also extend to
information required for:
- Building permit
- Approval of any return
pipeline connections to RWF
influent interceptors
upstream of headworks
- Approval of any architectural
design elements
- Approval of subsequent
CEQA documentation
City Plans and
specifications to
be submitted for
permits upon
completion of the
100% design

5. CEQA City
Planning
Departme
nt as lead
agency
City City City City Addendum to the
EIR approved
09/17/2019 and
subsequent
Addenda thereto
signed
05/28/2021.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-6
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

6. Permit for
Construction
Work in Public
Right-of-Way
City of
San José –
Departme
nt of
Transport
ation
City DesignBuilder Design-Builder: The Design-Builder
will be responsible for plan check
review and providing data and
information required for the permits
related to work in the public right-ofway.

Design-Builder information supply
responsibilities also extend to
information required for approval of
construction work in public right-ofway along Zanker Road.

Design-Builder Permit will be
obtained
following
execution of the
Amended and
Restated DesignBuild Contract.

7. Water Service
Connections:

Application for
Approval/Supply
Design/
Coordination
City of
San José –
Municipal
Water
System
and South
Bay Water
Recycling
City DesignBuilder Design-Builder: The Design-Builder
will be responsible for plan check
review, completing the application
process and design coordination,
and providing data and information
required for the permits related to
potable water system, municipal fire
water, and recycled water
connections, including third party
backflow testing.

Design-Builder No permits
expected to be
required for
construction. If
required, DesignBuilder
responsible for
obtaining.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-7
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

8. Encroachment
Permit
City of
Milpitas
City DesignBuilder Design-Builder: The Design-Builder
shall prepare the encroachment
permit application and provide data
and information required.

Design-Builder information supply
responsibilities also extend to
information required for the
Encroachment Permit for approval of
work within City Milpitas interceptor
easements.

Design-Builder Permit E-EN21-
0153 issued
10/19/2021 for
the Early Work
Package Work.

Design-Builder
responsible for
obtaining any
additional permit,
if required, for
work authorized
by the Amended
and Restated
Design-Build
Contract.

9. Approval for
Utilities Work
Pacific
Gas and
Electric
Company
(PG&E)
City DesignBuilder Design-Builder: The Design-Builder
will be responsible for plan check
review and providing data and
information required to conduct
utilities work.

Design-Builder No permit
expected to be
required for
construction. If
required, DesignBuilder
responsible for
obtaining.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-8
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

10. PG&E Utility
relocation:

Application for
Approval/Coordi
nation
PG&E City DesignBuilder City: The City has submitted a preliminary application for relocation
of the utility pole that conflicts with
the new dewatering facilities.

Design-Builder: The Design-Builder
will assume responsibility for design
and schedule coordination with
PG&E.

City Preliminary
Application is
complete.

Ongoing design
and schedule
coordination
required.

11. Authority to
Construct
Bay Area
Air
Quality
Manageme
nt District
(BAAQMD)
City City City: The City will provide the
Design-Builder with information
relating to current Title V permitted
facility equipment and air permit
requirements, including monitoring,
recordkeeping and reporting.

Design-Builder: The Design-Builder
will be responsible for providing data
and information required for the
permits related to on-site air
monitoring and Dewatering Facility
odor-scrubbing equipment.

City Application
Submitted.

Authority to
Construct
Pending
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-9
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

12. Air Quality
Permit to
Operate
BAAQMD City City City: The City will provide BAAQMD
with information relating to source
test results of any newly installed
process equipment to obtain Permit
to Operate.

Design-Builder: The Design-Builder
will be responsible for providing data
and information required for the
permits related to on-site air
monitoring and Dewatering Facility
odor-scrubbing equipment, if
scrubbing equipment is required by
BAAQMD. Current design does not
include air quality treatment.

City Provisional
permit will be
obtained in
advance of
operation.

Performance
testing data
required for final
permit based on
actual operation.

13. Air Quality -
Off-Road
Construction
Equipment
Certification
BAAQMD DesignBuilder DesignBuilder Design-Builder Design-Builder No application or permit expected
to be required. All
equipment has
certification that
can be provided
demonstrating
compliance with
CARB
requirement.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-10
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status
Habitat Plan
Development
Fee
Santa
Clara
Valley
Habitat
Agency
(SCVHA)
City City City: The City will submit an
application to address permanent
and/or temporary impacts to lands
within the Santa Clara Valley
Habitat Plan Burrowing Owl Fee
Zone.

Design-Builder: The Design-Builder
will be responsible for providing
engineering support related to
determination of impact fees.

City City has
completed
calculations and
paid fee.

15. Exploratory
Boring Permit
Santa
Clara
Valley
Water
District
DesignBuilder DesignBuilder
Design-Builder Design-Builder Design-Builder
obtained permit
No E2019121701

16. Oversize/
Overweight
Truck Permit
California
Departme
nt of
Transport
ation
(Caltrans)
DesignBuilder DesignBuilder Design-Builder Design-Builder No oversize truck permits are
expected to be
required but
Design-Builder is
responsible for
obtaining this
approval if
needed.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-11
3643403.6 042907 CTR
Table 3-1
Governmental Approvals Responsibility
Item
No.

Name of
Governmental
Approval
Issuing
Agency
Permittee/
Approval
Holder
Application
Manager Information Supply Responsibility Fee Payment
Responsibility
Status

17. Variance from
Building Code
California
Energy
Commissi
on
City DesignBuilder Design-Builder: The Design-Builder
will be responsible for plan check
review and providing data and
information required to obtain
variances from Building Code, if
needed.

Design-Builder No variance
anticipated to be
required but
Design-Builder is
responsible for
obtaining this
approval if
needed.

18. Environmental
Clearance for
Preliminary Site
Investigation
Activities and
Tree Removal
City of
San Jose,
CIP
Environm
ental
Team
City City Design-Builder: The Design-Builder
will be responsible for providing data
and information required to obtain
environmental clearances.

Design-Builder City completed
environmental
habitat surveys
and tree
protection
measures in lieu
of tree removal.

Environmental
surveys may
need to be redone
if there is a pause
in construction.

19. Spill
Prevention,
Control, and
Countermeasure
Plan
California
Environm
ental
Protection
Agency
City DesignBuilder Design-Builder Design-Builder To be developed following
execution of the
Amended and
Restated
Contract.

Notes:

1. Subject to the terms and conditions of this Amended and Restated Design-Build Contract, the Application Manager is responsible for obtaining the applicable permit on or before the agreed-upon date in the Design-Build Schedule attached to the Amended and Restated Design-Build Contract (which dates will be the basis for the Assumed Approval Issuance Dates in Table 3-2).

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 3
Santa Clara Regional Wastewater Facility Governmental Approvals A3-12
3643403.6 042907 CTR
Table 3-2
Governmental Approvals Schedule
Name of Governmental
Approval Issuing Agency
Governmental Approval Application
Date (Number of days from DesignBuild Work Notice-to-Proceed) Assumed Approval Issuance Date
(Number of days from Governmental
Approval Application Date)
Construction Safety Permits Cal/OSHA 30 30
Building Permits City of San José -
Public Works and
Fire Departments
To be Submitted Prior to Design-Build
Work Notice-to-Proceed
30 Building Permits Structural
Engineering and
Code Inspection
Architectural Revie
City of San Jose,
City
Council/Planning
Building and Code
Enforcement
Department
To be Submitted Prior to Design-Build
Work Notice-to-Proceed
30 Permit for Construction
Work in Public Right-of-Way
City of San José –
Department of
Transportation
120 60
Authority to Construct BAAQMD October 25, 2021 180
Spill Prevention, Control,
and Countermeasure Plan
California
Environmental
Protection Agency
30 60
Notes:

1. In the event of any inconsistencies in the Governmental Approval Application Dates and Assumed Approval Issuance Dates in this Table 3- 2 and the Design-Build Schedule attached to the Amended and Restated Design-Build Contract, the Design-Builder will revise the applicable dates when preparing the Baseline Schedule in accordance with Appendix 5 (General Design-Build Work Requirements) to reflect the applicable dates set forth in this Table 3-2.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
APPENDIX 4

TECHNICAL SPECIFICATIONS
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
APPENDIX 4

TECHNICAL SPECIFICATIONS

4.1 PURPOSE
These Technical Specifications set forth the technical requirements for the Project. Nothing in these Technical Specifications shall relieve the Design-Builder of its obligation to meet the Performance Guarantees set forth in Appendix 9 (Commissioning and Acceptance). The DesignBuilder may request that the City waive certain non-conformities. Such requests shall be in writing and describe the non-conformity with specificity. The City may elect to grant such request(s) at its sole discretion.

4.2 DESIGN GUIDANCE DOCUMENTS AND STANDARD SPECIFICATIONS Template All Construction and Deliverable Material, including the Final Design Documents, shall conform to the following design guidance documents and standard specifications except where variances have been agreed to by the City. Dates of current versions are listed below, but the version in effect during Definitive Contract Amendment negotiations will be incorporated into the amendment and shall govern.
 Architectural Design Guidelines (CIP, October 20, 2015)  Architectural Program Guidelines (CIP, October 20, 2015)  Asset Tagging Convention SOP-AM100 Version Y19-3.02 (December 20, 2019)  Automation Requirements - R7 (CIP, July 9, 2021)
 CAD Standards (CIP, November 2016)
 Design Guideline - Electrical (CIP, February 5, 2016)  Design Guideline – Engineering Seals (March 28, 2016)  Design Guideline – Deferred Submittals and Design Change Memoranda for SECI Approval (October 29, 2021)
 Design Guideline - Piping Systems (CIP, February 5, 2016)  Design Guideline – Process Control Philosophy, Narrative, and Strategy (CIP, July 13, 2020)
 Design Guideline - Standard Operating Procedures (CIP, July 15, 2020)  Design Guideline - Structural (CIP, April 13, 2017)
 Hazardous Materials Investigation and Remediation Protocol (CIP, March 9, 2019)  Permitting Process Guidelines (CIP, November 16, 2017)  Project Guidance for Welding Specifications (CIP, January 3, 2019)  Recommendation for adopting Vertical Datum (CIP, August 28, 2014)  City Standard Specification Division 01, Section 01 88 14, Seismic Design Criteria as modified for the Dewatering Project (Attachment 4A)
 City Standard Specification Division 01, Section 01 88 15, Wind Design Criteria, as modified for the Dewatering Project (Attachment 4A)
 City Standard Specification Div 01, Section 01 01 73 23, Bracing and Anchoring, as modified for the Dewatering Project (Attachment 4A)
 City Standard Specification Div 01, Section 01 01 73 29, Cutting and Patching, as modified for the Dewatering Project (Attachment 4A)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-2
3643403.6 042907 CTR
 City Standard Specifications – Division 40 – Process Integration as modified for the Dewatering Project (CIP, October 2017)

4.3 CODES AND REGULATIONS
All Construction and Deliverable Material, including the Final Design Documents, shall conform to all applicable codes and regulations, including but not limited to the following:
 National Fire Protection Association (NFPA) 820: Standard for Fire Protection in Wastewater Treatment and Collection Facilities, 2016 or latest edition  San José Municipal Code, Chapter 17.12 – City of San José Fire Code  San José Municipal Code, Chapter 17.68 – Hazardous Materials Storage Permit  San José Municipal Code, Chapter 17.12 – Toxic Gas Ordinance  San José Municipal Code, Chapter 17.12 – Fire Safety During Construction  2019 California Building Code – CCR Title 24 Part 2
 2019 California Electrical Code – CCR Title 24 Part 3  2019 California Mechanical Code – CCR Title 24 Part 4  2019 California Plumbing Code – CCR Title 24 Part 5
 2019 California Green Building Standards Code
 2019 California Fire Code (CFC)
 2019 California Division of Occupational Safety and Health – (CAL/OSHA)  2020 National Fire Protection Association – 820 Standard for Fire Protection in Wastewater
 Treatment and Collection Facilities
 California Coastal Zone Management ACE, Applicable Provisions  San Jose Municipal Code – Amendments to the Title 24 Technical Codes and Other Applicable Ordinances
 San Jose Reach Code

4.4 MAJOR PROJECT ELEMENTS
The Project shall include but is not limited to the following major elements:
 A new dewatering building or buildings housing digested sludge dewatering systems centrifuges specifically designed for dewatering DS, dewatered cake conveyance and storage facilities, truck loading facilities with weight scales, and various support facilities and systems
 New digested sludge transfer pumping systems to convey digested from the City’s temperature-phased anaerobic digestion process (currently under construction) to new digested sludge storage facilities
 New digested sludge storage facilities
 New emulsion polymer system with storage tanks, blending and metering units DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-3
3643403.6 042907 CTR
 New digested sludge pump station and pipelines to convey digested sludge from digested sludge storage to the new dewatering building
 New centrate pumping systems and pipelines to convey centrate from the dewatering process back to the new headworks facility within the Regional Wastewater Facility  Various new and modified ancillary facilities and systems Further descriptions of these facilities, including assumptions and criteria used to date can be found in the DPS Design Document (Attachment 4B).

4.5 MINIMUM TECHNICAL REQUIREMENTS
This section describes minimum technical requirements for the Project. The Design-Builder shall complete the design and perform the Construction work in conformance with the minimum technical requirements contained herein.

4.5.1 Operating Strategy
The Project as currently conceived has been assumed to operate continuously (i.e., 24 hours per day, 7 days per week, and 365 days per year). The City intends to staff the facility with operators at all times. Maintenance and management staff are expected work day shifts only.

The operating strategy does not assume use of digested sludge storage or dewatered cake storage as part of routine operations. Instead storage is to be used to allow for planned and unplanned suspension of dewatering operations.

4.5.2 Digested Sludge Flows, Loads, and Design Years
Table 4-1 sets forth digested sludge flow and loading values for sizing the Project. The listed values are projections for digested sludge leaving the anaerobic digesters following commissioning of the Digester and Thickener Facilities Upgrade project (DTFU), which is currently being commissioned. The DTFU has been designed to normally produce co-thickened sludge with a thickened sludge concentration of 5.5 percent prior to digestion. However, the Dewatering Project shall be designed to accommodate co-thickened sludge that ranges from 4.5 to 5.5 percent total solids.

The listed values in Table 4-1 include projections of digested sludge flows and loading rates (as measured downstream of the digesters) with ferric addition beginning in 2022 (startup) and with imported materials added approximately five years after startup. (Imported materials may include fats, oils and grease brought to the RWF in trucks and scum and grease collected from DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-4
3643403.6 042907 CTR
in-plant treatment processes). The Project shall be designed to convey and process the full range of digested sludge flows and loading rates, considering both with and without ferric addition and imported materials (i.e. whichever results in the most stringent design condition).

TABLE 4-1
Dewatering Flow and Load Projections
Condition 2022 (lbs/hr) 2042 (lbs/hr)1 2052 (lbs/hr)1 Ultimate (lbs/hr)1
Annual Average 6,255 9,299 10,434 10,927
Peak 30-Day 7,385 10,594 11,896 14,303
Peak 7-Day 8,346 11,887 13,356 15,871

1. Includes 667 lbs/hr of imports.

2. Digested Sludge is expected to contain 2.3 to 2.8 percent Total Solids.

4.5.3 Phased Design and Construction
Table 4-2 sets forth the CITY’s capacity and redundancy criteria for the Project, as modified from those included in the Project Definition Report (Brown and Caldwell). [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-5
3643403.6 042907 CTR
Table 4.5-2
Capacity and Redundancy Requirements
Project
Element
Project Requirements Ultimate Requirements
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
DS transfer
pumps
Pumps: peak day flow at
2052 conditions
Pumps: N+1, with all pumps
of equal capacity and shared
redundant pump between 2
duty pumps
Pumps: peak day flow at
ultimate conditions
Pumps: N+1 with all pumps of
equal capacity and shared
redundant pump between the 2
duty pumps.

DS transfer
pipelines
Pipelines: peak day flow at
ultimate conditions
Pipelines: N+1, with all
pipelines of equal capacity
Pipelines: same as Initial
Project
Pipelines: N+1, with all
pipelines of equal capacity
DS storage Volume to hold 1 day of
peak 30-day flow at 2052
conditions at 2.8% total
solids (4)
A minimum of one new tank
shall be provided, with all
tanks normally in service
Ultimate storage to be
determined in the future.

Ultimate storage redundancy
to be determined in the future.

DS Transport
pumping station
Peak 7-day flow with no
drawdown of DS storage
and ferric addition at 2052
conditions
2 Duty +1 standby, with all
pumps of equal capacity.

Peak 7-day flow with no
drawdown of DS storage at
ultimate conditions
N+1, with all pumps of equal
capacity
DS pipelines Peak 7-day flow at ultimate
conditions
N+1, with all pipelines of
equal capacity
Same as initial Project Same as initial Project
Dewatering
trains (5)
Peak 30-day flow and load
with no drawdown of DS
storage and ferric addition
at 2042 conditions(7)
N+1, with all trains of equal
capacity
Peak 30-day flow and load
with no drawdown of DS
storage at ultimate conditions
N+1, with all trains of equal
capacity
Dewatered cake
storage
Volume to hold 2 days of
peak 30-day load with no
drawdown of DS storage at
2042 conditions(7)
4 equal size bins, minimum,
with all bins normally in
service
Ultimate storage to be
determined in the future.

Dewatered cake
truck bays
Load 25 ton trucks in 30
minutes of active loading.
2 equal capacity bays,
minimum, with all bays
Load 25 ton trucks in 30
minutes of active loading.

All bays equal capacity, with all
bays normally in service
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-6
3643403.6 042907 CTR
Table 4.5-2
Capacity and Redundancy Requirements
Project
Element
Project Requirements Ultimate Requirements
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
normally in service
Centrate wet
wells
As required for full range of
expected operating
conditions from 2022
through ultimate
2 equal size wet wells,
minimum, with all wet wells
normally in service
Same as initial Project Same as initial Project
Centrate pumps
(6)
Peak 7-day flow at 2052
conditions with polymer
feed at no less than 0.25%
solution.

N+1, with all pumps of equal
capacity
Peak 7-day flow at ultimate
conditions
N+1, with all pumps of equal
capacity
Centrate
pipelines (6)
Peak 7-day flow at ultimate
conditions
N+1, with all pipelines of
equal capacity
Same as initial Project Same as initial Project
Polymer storage Volume for 14 days of
storage at Average 2052
conditions (third tank to be
added prior to 2052 to
maintain 14 day storage as
flows increase)
2 equal size tanks, minimum,
with all tanks normally in
service
Volume for 14 days at peak
7-day load under ultimate
conditions
3 equal size tanks, minimum,
with all tanks normally in
service
Polymer
metering
Sufficient for dewatering
train demands
N for each dewatering train
with all units of equal capacity
Sufficient for dewatering train
demands.

N for each dewatering train with
all units of equal capacity
Foul air
ventilation
Ventilation: as required for
hazardous area
classifications, and air
permit under 2052
conditions
Ventilation fans: N+1, with
all fans of equal capacity
Ventilation: as required for
worker safety, hazardous
area classifications, and air
permit under ultimate
conditions
Ventilation fans: N+1, with all
fans of equal capacity
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-7
3643403.6 042907 CTR
Table 4.5-2
Capacity and Redundancy Requirements
Project
Element
Project Requirements Ultimate Requirements
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
Utilities Sufficient capacity for
ultimate conditions
Equipment: N+1, with all
equipment of equal capacity
Pipelines:

Stormwater system design
per City of San Jose design
guidelines. WTR4 connected
to RWF system. WTR1
connected on existing WTR1
at the southeast corner of the
Dewatering site.

Same as initial Project Same as initial Project
Power supply
(from 4.16 kV
substations
through 480 V
switchgear
Sufficient capacity for
ultimate conditions.

Switchgear and conduits to
be designed with sufficient
spares and spaces for
future loads.

The power supply systems
shall include capacity for
ultimate loads through the
480 V switchgear and include
spare breakers and spaces in
panels and spare conduits for
future expansions of the
facilities.
 Medium-voltage feeder
cables from M4 and M5
with each feed capable of
providing power for entire
facility.
 Dual medium-voltage
switchgear connected
through dual tie breakers
 Dual pairs of transformers
to reduce voltage to 480 V
Same as initial Project Same as initial Project
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-8
3643403.6 042907 CTR
Table 4.5-2
Capacity and Redundancy Requirements
Project
Element
Project Requirements Ultimate Requirements
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
Required Peak Design
Capacity (1), (2)
Required
Redundancy (3)
 Dual 480 V switchgear
panels with dual feeds from
the transformers and dual
tie breakers in each panel
Power supply
(from 480 V
switchgear to
facilities and
systems)
Sufficient for initial Project
loads with capability to
expand to accommodate
future loads
Space shall be provided in
electrical rooms throughout
the facility to allow for future
expansion. Distribution
panelboards should also be
provided in electrical rooms.
 MCCs with dual feeds and
tie breakers
 Uninterruptible power
supply (UPS) systems
feeding control systems in
the event of a power outage
Sufficient capacity for
ultimate conditions
Same as initial project
Control systems Sufficient for initial Project
with capability to expand to
accommodate future
facilities and systems
Provide redundancy in
accordance with RWF
Automation Guidelines
defined for the project.

Sufficient capacity for
ultimate conditions
Provide redundancy in
accordance with RWF
Automation Guidelines defined
for the project.

Notes:
(1) Project elements should have sufficient capacity to process flow and loading rates that result from the stated conditions, at a minimum. (2) Co-thickened sludge fed to the anaerobic digesters may range from 4.5% to 5.5% TS, 2.3% - 2.8% TS to Dewatering. Specified flow and volume capacity requirements for each Project element should be sufficient for flow rates resulting from the full range of co-thickened sludge concentration unless otherwise specified.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-9
3643403.6 042907 CTR
(3) Some redundancy requirements are stated as “N+X,” where N is the number of duty units and X is the number of standby units at peak flow and/or loading. The value of N is to be determined by the Design-Builder. (4) The required volume of DS storage provided for the initial Project shall be provided in a new storage tank. (5) A dewatering train consists of a DS grinder; a centrifuge feed pump; a polymer blending and metering system; a centrifuge with a diverter gate or classifying screw conveyor; and all associated piping, valves, and controls. (6) Centrate pumps and pipelines should have capacity for all flows, including polymer make-up and dilution water. (7) 2042 was selected based on anticipated budgetary limitations and to provide at least 20 years of operation before expansion is required. Use straight-line interpolation to determine flow and load values between 2022 and 2052. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-10
3643403.6 042907 CTR

4.5.4 Phased Design and Construction
The Digested Sludge Dewatering Facility Basis of Design Report describes phasing concepts for the Project, including a future phase to provide sufficient capacity and redundancy for continuous operation under ultimate flow and load conditions. In addition, the Digested Sludge Dewatering Facility Basis of Design Report identifies an intermediate phase to allow for the installation of additional equipment as needed to meet capacity and redundancy requirements within budget constraints for the initial construction. In addition to Project phasing, the City may elect to add other treatment facilities at the main Dewatering Facility Site.

In addition, design drawings shall show space and interface points for future facilities and systems, including but not limited to:
 Space for future dewatering equipment: Space shall be provided for future addition of pumps, fans, dewatering trains, dewatered cake storage bins, truck loading bays, and associated piping, ducts, and appurtenances.
 Space for new processes and facilities: Include space for processes and facilities that may be added in the future, including a foul air treatment system, polymer storage, and a centrate sidestream treatment process. Provide means (i.e. blind flanges, T-sections) to re-route foul air from planned stack system (included in current design) to potential future treatment system.
 Future connection points: Provide features that allow for easy interconnection and expansion of new mechanical equipment, process trains, and piping. At the dewatering building, provide floor penetrations to allow for addition of future dewatering trains including penetrations for centrate piping, digested sludge piping, polymer piping and other inter-connections
 Electrical and control spares and spaces: Providing electrical panels and conduits with spares and spaces to accommodate future expansion and provide space for addition of new panels and equipment. Provide control systems with sufficient spare capacity and conduits and space for future control panels.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-11
3643403.6 042907 CTR

4.5.5 City Specifications and Standards
The Design-Builder shall incorporate City technical specifications and standards dated March 02, 2021 into its design and construction specifications unless other dates are noted in Section

4.2 (Design Guidance Documents and Standard Specifications) of this Appendix 4. If there are questions as to the applicability of a particular City specification or standard to the Project or the delivery method, the Design-Builder shall consult with the City on how such specification or standard will be included in accordance with subsection 1.2(V) (Applicability, Stringency and Consistency of Contract Standards) of this Amended and Restated Design-Build Contract.

4.5.6 Environmental Mitigation Measures
The Environmental Mitigation Measures included in the MMRP constitute part of the Technical Specifications, with which the Design-Builder is obligated to comply hereunder in accordance with Section 4.3 (Environmental Review) of this Amended and Restated Design-Build Contract.

4.5.7 Other Minimum Technical Requirements
Other City minimum technical requirements are generally reflected in the 60% Design Documents (Attachment 4B). The following requirements are included for clarification:
 Trees shall be installed along the north side of the access road to Zanker Road to visual screen the dewatering building as vehicles drive south-bound on Zanker Road.  The centrate pump station shall have duty capacity to accommodate continuous secondary polymer dilution flows to achieve polymer dilution to 0.25 for the number of duty centrifuges up to the defined design year for the centrate pump station.

4.6 60% Definitive Project Submittal (DPS) Design Completion Documents and 60% DPS Design Comments Lists
All Construction and Deliverable Material, including the Final Design Documents, shall conform to the following documents developed by the Design-Builder with the clarifications provided in the City clarifications letters and Design-Builder responses and with the future work and modifications indicated in the 60% design comments:
(a) DPS Design Documents (Attachment 4B)
(i) Specifications, Division 01 through 46;
(ii) Drawings;
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose
Dewatering Facility at the San Jose- Appendix 4
Santa Clara Regional Wastewater Facility Technical Specifications A4-12
3643403.6 042907 CTR
(iii) Engineering Calculations;
(b) DPS Cost Model, as revised, and DPS Assumptions, Clarification’s and Exclusions (Attachment 4C)
(c) City Clarification letters on the DPS and Design-Builder responses (Attachment 4D)
(d) Descriptions of work included in Allowance Items (Attachment 4E) (e) 60% Design Comments Lists – these include items identified by the City to be evaluated as the design advances, post 60% design. (Attachment 4F) The comment lists include:
(i) The City furnished Quality Review Form (QRF) list including DesignBuilder responses; (ii) City comments and responses from the Bluebeam review exported into a list.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 4A
APPLICABLE CITY STANDARD DIVISION 01 SPECIFICATIONS
(as modified for the Dewatering Project)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 4
Dewatering Facility at the San Jose- Attachment 4A
Santa Clara Regional Wastewater Facility Applicable City Standard Division 01 Specifications 3643403.6 042907 CTR
ATTACHMENT 4A
APPLICABLE CITY STANDARD DIVISION 01 SPECIFICATIONS
(as modified for the Dewatering Project)
The Division 01 specifications included in this attachment were based on the City of San Jose’s Standard Division 01 specifications dated March, 2020 and modified for the Dewatering Project. Only those Division 01 specification sections included in this Attachment and in Attachment 5A to Appendix 5 (General Design-Build Work Requirements), Attachment 6A to Appendix 6 (Design-Build Quality Assurance and Quality Control Requirements), Attachment 7A to Appendix 7 (Design-Build Work Review Procedures) and Attachment 9A to Appendix 9 (Commissioning and Acceptance) are incorporated as requirements for the Dewatering Project. For clarity, agreed-to modifications are shown in strike and underline.

Div 01 Section 01 73 23 Component Bracing and Anchoring Div 01 Section 01 73 29 Cutting and Patching
Div 01 Section 01 88 14 Seismic Design Criteria
Div 01 Section 01 88 15 Wind Design Criteria
[ATTACHED]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-1
SECTION 01 73 23

COMPONENT BRACING AND ANCHORING
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Minimum structural requirements for the design, anchorage and bracing of architectural/mechanical/HVAC/electrical components, equipment, and systems, and nonbuilding structures.

B. Design of supports, attachments and bracing for all parts or elements of the architectural, mechanical, HVAC and electrical systems shall be provided in accordance with this Section and the individual equipment specifications.

C. The requirements of this section apply to the design of the structural elements and features of equipment and to platforms/walkways that are provided with equipment or nonbuilding structures.

D. This section applies to nonbuilding structures and nonstructural components that are permanently attached to structures as defined below and in ASCE 7-1016. Note that equipment is defined as a non-structural component and tanks are defined as nonbuilding structures.

E. Design in accordance with the criteria listed within this section and conform to the provisions of the design codes listed within this section.

F. Additional pipe, cable tray, ductwork and conduit loading requirements are specified in the Technical Specifications. Unless noted otherwise in the individual equipment specifications, engineering design is not required for attachments, anchorage, or bracing detailed on the Drawings or where the size of attachments, anchorage, or bracing is defined in the technical specification sections.

G. The following nonstructural components are exempt from the seismic design loading requirements of this section.

1. Furniture (except permanent floor supported storage cabinets over 6 ft tall).

2. Temporary or movable equipment.

3. Mechanical and electrical components in Seismic Design Categories D, E, or F where all of the following apply:
a. The component importance factor, Ip, is equal to 1.0; b. The component is positively attached to the structure; c. Flexible connections are provided between the component and associated ductwork, piping, and conduit; and either
1) The component weighs 400 lb or less and has a center of mass located 4 ft or less above the adjacent floor level; or
2) The component weighs 20 lb or less or, in the case of a distributed system, 5 lb/ft or less.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-2
H. Related Sections: NOT USED

1. Section 01 88 14 – Seismic Design Criteria

1. Section 01 88 15 – Wind Design Criteria
A. Definitions: The following definitions are used throughout this specification section:

1. CONTRACTOR : The Design-Builder for the Dewatering Project

2. ENGINEER: The Design-Builder’s Engineer serving as the Engineer-of-Record for the Dewatering Project

1.3. CITY: The City of San Jose, its staff, and representatives

1.02 REFERENCES
A. The references listed below are a part of this section. Where a referenced document contains references to other standards, those documents are included as references under this section as if referenced directly. In the event of conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.

Reference Title
Aluminum Design
Manual
The Aluminum Association, Aluminum Design Manual with Specifications and Guidelines for Aluminum Structures
AAMA American Architectural Manufacturer’s Association
ACI 318 Building Code Requirements for Structural Concrete ACI 350 Code Requirements for Environmental Engineering Concrete Structures ACI 350.3 Seismic Design of Liquid-Containing Concrete Structures ACI 530 Building Code Requirements and Specification for Masonry Structures and Companion Commentaries
AISC 341 Seismic Provisions for Structural Steel Buildings ACI 360 Specification for Structural Steel Buildings
ASCE 7 Minimum Design Loads for Buildings and Other Structures ASTM C635 Manufacture, Performance and Testing of Metal Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings
ASTM C636 Installation for Metal Ceiling Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings
AWS D1.1 Structural Welding Code – Steel
AWS D1.2 Structural Welding Code - Aluminum
AWS D1.6 Structural Welding Code – Stainless Steel
CBC California Building Code
DOSH California Division of Occupational Safety and Health (DOSH; Cal/OSHA) IBC International Building Code with local amendments
NFPA-13 Installation of Sprinkler Systems
OSHA U.S. Dept. of Labor, Occupational Safety and Health Administration SMACNA Seismic Restraint Manual Guidelines for Mechanical Systems

1.03 DEFINITIONS
A. Structures: The structural elements of a building that resist gravity, seismic, wind, and other types of loads. Structural components include columns, posts, beams, girders, DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-3
joists, bracing, floor or roof sheathing, slabs or decking, load-bearing walls, and foundations.

B. Nonstructural Components: The nonstructural portions of a building include every part of the building and all its contents, except the structural portions, that carry gravity loads and that may also be required to resist the effects of wind, snow, impact, temperature and seismic loads. Nonstructural components include, but are not limited to, ceilings, partitions, windows, equipment, piping, ductwork, furnishings, lights, etc.

C. Nonbuilding Structures: Self-supporting structures that carry gravity loads and that may also be required to resist the effects of wind, snow, impact, temperature and seismic loads. Nonbuilding structures include, but are not limited to, pipe racks, storage racks, stacks, tanks, vessels, and structural towers that support tanks and vessels.

1.04 SUBMITTALS
A. Submittals per Section 01 33 00.

1. A copy of this specification section with each paragraph check-marked to indicate specification compliance or marked to indicate requested deviations from specification requirements.

2. Check-marks () shall denote full compliance with a paragraph as a whole.

Deviations shall be underlined and denoted by a number in the margin to the right of the identified paragraph. The remaining portions of the paragraph not underlined will signify compliance on the part of the CONTRACTOR with the specifications. Include a detailed, written justification for each deviation. Failure to include a copy of the marked-up specification sections, along with justification(s) for any requested deviations to the specification requirements, with the submittal shall be sufficient cause for rejection of the entire submittal with no further consideration.

3. Drawings depicting structural elements of nonstructural components and nonbuilding structures required to be designed per this specification section. Drawings shall be stamped, signed and dated by a California licensed professional engineer qualified to perform structural engineering.

4. List of nonstructural components and nonbuilding structures requiring wind and seismic design and anchorage.

5. Shop drawings showing details of complete wind and seismic bracing and anchorage attachment assemblies including connection hardware, and embedment into concrete.

6. Shop drawings showing plans, elevations, sections and details of equipment support structures and nonbuilding structures, including anchor bolts, structural members, platforms, stairs, ladders, and related attachments.

7. Identify interface points with supporting structures or foundations, as well as the size, location, and grip of required attachments and anchor bolts. Clearly indicate who will be providing each type of attachment/anchor bolt. Equipment vendor shall design anchor bolts, including embedment into concrete, and submit stamped calculations.

8. Manufacturer’s certificates of compliance with the seismic force requirements of this section.

9. Special Seismic Certification for the following equipment and components required to be fully operable in an essential facility after the maximum design earthquake per DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-4
CBC. Seismic Certification can be achieved by an analytical method using dynamic characteristics and forces.

B. Product Data Submittals per Section 01 33 00.

1. Calculations for structural elements of nonstructural components and nonbuilding structures required to be designed per this specification section. Calculations shall be stamped by a California licensed professional engineer qualified to perform structural engineering.

2. Calculations for all supports, bracing, and attachments shall clearly indicate the design criteria applied. Concrete embedment calculations shall be coordinated with thickness and strength of concrete members. Submit a tabulation of the magnitude of unfactored (service level) equipment loads at each support point, broken down by type of loading (dead, live, wind, seismic, etc.). Indicate impact factors applied to these loads in the design calculations.

1.05 QUALITY ASSURANCE
A. Submittals preparation, review and engineer qualifications shall be as specified in Section 01 88 14.

B. Quality Control By Owner CONTRACTOR Requiring CITY Approval:

1. Special Inspection of nonstructural components and nonbuilding structures, and their anchorages shall be performed by the Special Inspector under contract with the OwnerCONTRACTOR and in conformance with CBC Chapter 17. Special Inspector(s) and laboratory shall be acceptable to the Owner in their sole discretion. Special Inspection is in addition to, but not replacing, other inspections and quality control requirements. Where sampling and testing required conforms to Special Inspection standards, such sampling and testing need not be duplicated. [NTD: Walsh is providing Special Inspection. Confirm language change]

1.06 DESIGN PREPARATION
A. For structural elements of nonstructural components and nonbuilding structures required to be designed per this specification section, prepare Drawings and design calculations, stamped by a California licensed professional engineer qualified to perform structural engineering.

B. Prepare calculations for all supports, bracing, and attachments that clearly indicate the design criteria applied. Concrete embedment calculations shall be coordinated with thickness and strength of concrete members. Submit a tabulation of the magnitude of unfactored (service level) equipment loads at each support point, broken down by type of loading (dead, live, wind, seismic, etc.). Indicate impact factors applied to these loads in the design calculations.

1.07 DETAILS OF AND CALCULATIONS FOR anchorages shall be submitted prior to placement of concrete or erection of other structural supporting members.

A. Design Codes

1. The following standard codes have application at this site for:

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-5
Design Code
Buildings/Structures: California Building Code 20162019, and ASCE 7-1016 Reinforced concrete: ACI 350 -06 and ACI 350.3-06 for Concrete Liquid Containing Structures, ACI 318-14 for all other reinforced concrete Concrete Masonry Units: ACI 530
Structural steel: AISC 360-1016 and AISC 341-1016
Aluminum: Aluminum Design Manual, Latest Edition
Welding: AWS Welding Codes, Latest Edition
Occupational health and
safety requirements:

OSHA and DOSH
Note: When conflicting requirements occur, the most stringent requirements will govern the design.

B. When requirements conflict, the most stringent requirement governs the design.

1.08 DESIGN LOADS
A. Design nonstructural components and nonbuilding structures for the following loads. Do not apply wind and snow loads to nonstructural components and nonbuilding structures that are located inside buildings.

B. Dead Loads:

1. Add an additional allowance for piping and conduit when supported and hung from the underside of equipment and platforms.

2. Typical allowance for piping and conduit unless noted otherwise: 20 psf, unless noted otherwise within a Non-Building structure specification (i.e. tanks).

C. Uniform Live Loads:

Elevated grating floors: 100 psf
Columns: No column live load reduction allowed
Exitways, stairs and landings: 100 psf
Equipment platforms, walkways/catwalks (other
than exitways):
60 psf
Utility bridges: 75 psf per level minimum
D. Wind Loads:

1. Wind design criteria shall be as specified in Section 01 88 15.

2. Design exterior nonstrutural components and nonbuilding structures, unless located in a pit or basin, to withstand the design wind loads without consideration of shielding effects by other structures.

E. Seismic Loads:

1. Seismic design criteria shall be as specified in Section 01 88 14.

2. Design exterior nonstrutural components and nonbuilding structures, unless located in a pit or basin, to withstand the design wind loads without consideration of shielding effects by other structures.

3.2. Calculate seismic loads on the basis of the governing building code. Include equipment operating loads in the structure dead load.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-6

4.3. Check individual members for seismic and full member live load acting simultaneously, except that flooded equipment loads (infrequent occurrence) need not be combined with seismic loads. Combine equipment operating loads with seismic loads.

F. Impact Loads:

1. Consider impact loads in the design of support systems.

2. Use the following impact load factors unless recommendations of the equipment manufacturer will cause a more severe load case.

Rotating machinery: 20% of moving load
Reciprocating machinery: 50% of moving load
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-7
Monorail Hoists:
• Vertical 25% of lifted load
• Longitudinal 10% of lifted load
Hangers supporting floors and platforms: 33% of live and dead load G. Temperature:

1. Include the effects of temperature in design where nonstructural components and nonbuilding structures are exposed to differential climatic conditions. See climatic conditions below for temperature extremes.

H. Load Combinations

1. Design all nonstructural components and nonbuilding structures to withstand the load combinations as specified in the governing building code. Where the exclusion of live load or impact load would cause a more severe load condition for the member under investigation, then ignore the load when evaluating that member.

I. Design Considerations

1. Design nonstructural components and nonbuilding structures for the following conditions.

2. Climatic Conditions:

Maximum design temperature: 90111 degrees Fahrenheit
Minimum design temperature: 1523 degrees Fahrenheit

3. Foundations:
a. Extend foundations supporting nonstructural components and nonbuilding structures below the frost line, or supported on non-frost susceptible structural fill down to the frost line.

Frost line for foundations: 18 inches
Note: Consult project geotechnical report for allowable soil bearing recommendations at location of structure.

J. Column Base Fixity

1. Design column bases as pinned connections. No moments shall be assumed to be transferred to the foundations.

2. Where significant shear loads (greater than 510,000 lb. per anchor bolt) are transferred at column base plates, the equipment vendor shall provide a shear key designed to transfer the shear load.

K. Deflections

1. Maximum beam deflections as a fraction of span for walkways and platforms: L/240 for total load and L/360 for live load.

2. Maximum total load deflection for equipment supports: L/450.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPARTMENT BRACING AND ANCHORING DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER 7758
01 73 23-8
PART 2 PRODUCTS

2.01 GENERAL
A. Materials shall be in conformance with information shown on the Drawings and in other technical specification sections. See individual component and equipment specifications for additional requirements.

PART 3 EXECUTION

3.01 GENERAL
A. Make attachments and braces in such a manner that the component force is transferred to the lateral force-resisting system of the structure. Base attachment requirements and size and number of braces on the calculations submitted by the CONTRACTOR.

B. All anchorage of equipment weighing greater than 2,000 lbs, is specified to be made by cast-in anchor bolts in concrete elements unless specifically noted otherwise on the Drawings or other specification sections. CONTRACTOR shall be responsible for any remedial work or strengthening of concrete elements because of superimposed seismic loading if anchor bolts are improperly installed or omitted due to lack of submittal review or improper placement for any reason, at no additional cost to the OwnerCITY.

C. Provide anchor bolts in accordance with the Technical Specifications. Base size of anchor bolts and embedment on the submitted calculations.

D. Details of and calculations for anchorages shall be submitted prior to placement of concrete or erection of other structural supporting members. Submittals received after structural supports are in place will be rejected if proposed anchorage method would create an overstressed condition of the supporting member. The CONTRACTOR shall be responsible for revisions to the anchorages and/or strengthening of the structural support so that there is no overstress condition at no additional cost to the OwnerCITY.

PART 4 ADDITIONAL REQUIREMENTS (NOT USED)

END OF SECTION
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT CUTTING AND PATCHING
DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 73 29 – 1
SECTION 01 73 29

CUTTING AND PATCHING
PART 1 GENERAL

1.01 SUMMARY
A. Section Includes: Cutting and Patching for existing and new construction.

B. Related Sections: NOT USED

1. Section 01 33 00 – Submittal Procedure

2. Section 01 50 00 – Temporary Facilities and Controls

1. Section 01 77 00 – Closeout Procedures
C. Definitions: The following definitions are used throughout this specification section:

1. CONTRACTOR : The Design-Builder for the Dewatering Project

2. ENGINEER: The Design-Builder’s Engineer serving as the Engineer-of-Record for the Dewatering Project

3. CITY: The City of San Jose, its staff, and representatives C.D. Unless otherwise specifically stated, all requirements of this Section shall be the responsibility of CONTRACTOR.

1.02 SUBMITTALS
A. Informational Submittals:

1. Submit in accordance with Section 01 33 00 – Submittal Procedures.

2. Cutting and Patching Plan:
a. Submit details of proposed construction before cutting and patching construction commences affecting:
1) Work of CITY or of others
2) Structural integrity of element of Project
b. Cutting and Patching Plan shall include the following:
1) Identification of Work
2) Description of affected construction
3) Necessity for cutting, patching, alteration, or excavation 4) Description of proposed construction
5) Scope of cutting, patching, alteration or excavation c. Submit removal plans including:
1) Remediation or removal of hazardous or unsanitary conditions 2) Removal of items serving no useful purpose, such as abandoning piping, conduit and wiring
3) Removal of unsuitable or extraneous materials not marked for salvage, such as abandoned furnishings and equipment, and debris such as rotted wood, rusted metals, and deteriorated concrete
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT CUTTING AND PATCHING
DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 73 29 – 1
4) Cleaning of surfaces and/or removal of surface finishes as required to install new construction and finishes
5) Disposal of items not salvaged
PART 2 PRODUCTS

2.01 MATERIALS
A. Comply with specifications and standards for products involved.

PART 3 EXECUTION

3.01 PREPARATION
A. Identify existing materials that shall be patched, extended, or matched.

B. Provide adequate temporary support as necessary to ensure structural integrity of affected portion of Work.

C. Provide devices and methods to protect other portions of Project from damage and persons from injury.

D. Provide protection from elements for that portion of Project which may be exposed by cutting and patching and maintain excavations free from water.

3.02 CUTTING AND PATCHING
A. Cut, Fit, and Patch when required to:

1. Make its several parts fit together properly.

2. Remove and replace construction not conforming to Amended and Restated DesignBuild Contract Documents.

3. Remove samples of installed construction as specified for testing.

4. Provide routine penetrations of nonstructural surfaces for installation of piping and electrical conduit.

B. Execute cutting and demolition by methods which will prevent damage and will provide proper surfaces to receive installation of repairs.

C. Masonry, tile, plaster and metals shall be cut by methods which terminate surfaces in straight lines and at natural points of division.

D. Openings in Existing Concrete and Masonry:

1. Create openings by:
a. Saw cutting completely through concrete or masonry, or b. Scoring edges of opening with saw to at least 1-inch depth on both surfaces (when accessible) and removing concrete or masonry by chipping.

2. Do not allow saw cuts to extend beyond limits of opening.

3. Make corners square and true by combination of core drilling and grinding or chipping.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT CUTTING AND PATCHING
DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 73 29 – 1

4. Prevent debris from falling into adjacent tanks or channels in service or from damaging existing equipment and other facilities.

E. Sizing of Openings in Existing Concrete or Masonry:

1. Make openings sufficiently large to permit final alignment of pipe and fittings without deflections.

2. Allow adequate space for packing around pipes and conduit to ensure watertightness.

F. Grouting Pipes in Place:

1. Sandblast concrete surfaces and thoroughly clean sand and other foreign material from surfaces prior to placing grout.

2. Grout pipes, sleeves, castings, and conduits in place by pouring grout under a head of at least 4 inches. Vibrate grout into place. Completely fill the spaces occupied by pipes, sleeves, castings, and conduits.

3. Water cure the grout.

G. Connections to Existing Pipes:

1. Cut existing pipe square.

2. Properly prepare the ends for the connection indicated on the Drawings.

3. Repair any damage to existing lining and coating.

H. Rehabilitate all areas affected by removal of existing equipment, equipment pads and bases, piping, supports, electrical panels, electric devices, and conduits such that little or no evidence of the previous installation remains.

1. Fill areas in existing floors, walls, and ceilings from removed piping, conduit and fasteners with non-shrink grout and finish smoothly.

2. Remove concrete bases for equipment and supports by:
a. Saw cutting clean, straight lines with a depth equal to the concrete cover over reinforcement minus ½ inch below finished surface.
b. Do not cut existing reinforcement on floors.
c. X-ray mapping is required prior to concrete demolition where preservation of existing reinforcement is required.
d. Chip concrete within scored lines and cut exposed reinforcing steel and anchor bolts.
e. Patch with non-shrink grout to match adjacent grade and finish

3. Terminate abandoned piping and conduits with blind flanges, caps, or plugs.

I. Treat Existing Concrete Reinforcement as follows:

1. Where existing reinforcement is to remain, protect, clean, and extend into new concrete.

2. Where existing reinforcement is not to be retained, cut off as follows:
a. Where new concrete joins existing concrete at the removal line, cut reinforcement flush with concrete surface at the removal line b. Where concrete surface at the removal line is the finished surface, cut reinforcement two (2) inches below the surface, paint ends with epoxy, and patch holes with dry pack mortar.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT CUTTING AND PATCHING
DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 73 29 – 1

3.03 TRANSITIONING FROM EXISTING TO NEW WORK
A. New construction shall match architecture of existing construction and shall finish flush with existing construction and make smooth transitions.

B. Match patched construction with adjacent construction in texture and appearance so that patches or transitions are not visible at a 5-foot distance.

C. When finished surfaces are cut so that smooth transitions are impossible, terminate the existing surface in a neat manner, along a straight line, at a natural line of division and with the appropriate trim applied.

3.04 DAMAGED SURFACES
A. Finished surfaces that are damaged, lifted, and discolored shall be patched and replaced with matching material.

B. Provide adequate substrate support prior to patching finishes.

C. Painted or coated surfaces shall be refinished and patched in a manner that produces uniform color and texture to the entire surface.

D. When the existing surface finish cannot be matched, refinish the entire surface to the nearest change of plane exceeding 45 degrees.

3.05 CLEANING
A. Perform periodic and final cleaning as specified in Section 01 50 00 – Temporary Facilities and Controls and Section 01 77 00 – Closeout Procedures.

B. Clean CITY-occupied areas daily.

C. Clean spillage, overspray, and heavy collection of dust in CITY-occupied areas immediately.

D. At the completion of each portion of Work, clean area and make surfaces ready for successive portions of Work.

E. At completion of alterations in each area, provide final cleaning and return the space to conditions as specified by the ENGINEERCITY.

PART 4 ADDITIONAL REQUIREMENTS (NOT USED)

END OF SECTION
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT SEISMICWIND DESIGN CRITERIA DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 88 14-1
SECTION 01 88 14

SEISMIC DESIGN CRITERIA
PART 1 GENERAL

1.01 SUMMARY
A. Section Includes: Seismic design criteria for the following:

1. For the design, anchorage and bracing of architectural/mechanical/HVAC/electrical components, equipment, and systems, and non-building structures, as specified in Section 01 73 23.

2. Other structures or items as specified or indicated on the Drawings.

B. Submittals and other requirements shall be as required in Section 01 73 23.

C. Related Sections: NOT USED

1. Section 01 73 23 – Bracing and Anchoring
D. Definitions: The following definitions are used throughout this specification section:

1. CONTRACTOR: The Design-Builder for the Dewatering Project

2. ENGINEER: The Design-Builder’s Engineer serving as the Engineer-of-Record for the Dewatering Project
D.E. CITY: The City of San Jose, its staff, and representatives

1.02 REFERENCES
A. 2019 California Building Code (CBC)

1.03 SYSTEM DESCRIPTION
A. Design Requirements

1. Design of seismic loads for Structures other than Tanks: In accordance with the requirements of 2019 California Building Code (CBC), Section 1613 – Earthquake Loads, with design parameters listed below:
a. Design, 5 percent damped, spectral response acceleration parameter at short periods: SDS = 1.274 g.
b. Design, 5 percent damped, spectral response acceleration parameter at a period of 1 second: SD1 = 1.008 g.
c. Seismic Component Importance Factor for Anchorage of Mechanical and Electrical Equipment, IP: 1.0.
d. Component Amplification Factor, ap: In accordance with Table 13.5-1 and 13.6-1 of the ASCE 7-16.
e. Component Response Modification Factor, Rp: In accordance with Table 13.5-1 and 13.6-1 of ASCE 7-16.
f. Load Combinations: In accordance with 2019 CBC
1) Section 1605.2, Load combinations using strength design; or DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT SEISMICWIND DESIGN CRITERIA DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 88 14-2
2) Section 1605.3.1 or 1605.3.2, Basic load combinations using allowable stress design

2. Design of seismic loads for Steel Prestressed Concrete Tanks: In accordance with AWWA D100D110-13,1 Type 1 Tanks, Section 13 – Seismic Design of Water Storage Tanks, with the design parameters listed below:
a. Design, 5 percent damped, spectral response acceleration parameter at short periods: SDS = 1.274 g.
b. Design, 5 percent damped, spectral response acceleration parameter at a period of 1 second: SD1 = 1.008 g.
c. Seismic Importance Factor for the Design of Tanks and the Anchorage of Tanks, IE = : 1.25.
d. Component Response Modification Factors: Ri = 3 and Rc = 1.5, in accordance with Table 28 3 of AWWA D100D110-1113.
e. Load combinations: In accordance with 2019 CBC.
1) Section 1605.3.1, Basic load combinations using allowable stress design.

3. Anchorage to Concrete: In accordance with 2019 CBC, 1901.3. a. Post-installed anchors must comply with ICC-ES AC193 and AC308.

B. Resistance Requirements:

1. Seismic loads must be resisted by assemblies of welded plates, and anchor bolts embedded in concrete or bolts fastened to steel frames. All steel assemblies, anchor bolts and fasteners shall be of Type 316 Stainless Steel, unless otherwise indicated on Drawings.

2. Seismic loads must be resisted by direct bearing on anchors. Do not use connections in which forces are developed by friction in any part.

3. Use anchor bolts, bolts or welded studs for anchors for resisting seismic forces.

Anchor bolts shall have a standard hex bolt head unless otherwise indicated on Drawings. Do not use anchor bolts fabricated from rod stock with an L or J shape.

4. Do not use sleeve anchors, concrete anchors, chemical anchors, flush shells, power actuated fasteners, screws, or other types of anchors for resisting seismic loads unless indicated on the Drawings or accepted in writing by the ENGINEER.

5. Do not use more than 60 percent of the weight of the mechanical and electrical equipment for designing anchors for resisting overturning due to seismic forces.

6. Do not use more than 60 percent of the weight of the tank for resisting overturning due to seismic forces.

1.04 SUBMITTALS PREPARATION REQUIREMENTS
A. Calculations and Reference Drawings: Complete calculations and reference drawings.

1. Calculations shall be comprehensible and complete. When evaluating the structural strengths, indicate stress for comparing with strengths or show Demand/Capacity ratio in the structural elements. Evaluating the results by stating “Okay by Inspection” may not be acceptable. When spread sheets are used, reference equations and formulas found in calculations.

2. Reference drawings shall include plans, sections, details and equipment information as necessary for seismic calculations. Indicate the location of the equipment on plan which is necessary for load calculations.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT SEISMICWIND DESIGN CRITERIA DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 88 14-3

3. Submittals shall be returned without review if:
a. Submittals include only calculations without reference drawings b. Calculations have no sheet numbers or sheets are missing c. Calculations or reference drawings are illegible
d. Calculations are made based on wrong information, assumptions or design parameters
e. Information in reference drawings is insufficient for calculations or review B. Calculations shall be prepared, stamped, signed and furnished by a Civil or Structural Engineer licensed to practice in the State of California.

1. Qualification of Civil or Structural Engineer: Minimum of three (3) years of experience in water, wastewater or similar public works projects.

2. The Civil or Structural Engineer shall be responsible to obtain all necessary reference drawings and data from the CONTRACTOR or Manufacturer for his or her calculations.

C. Calculations shall be independently checked and signed by a Civil or Structural Engineer licensed to practice in the State of California.

1. Qualification of Civil or Structural Engineer: Minimum of three (3) years of experience in water, wastewater or similar public works projects.

PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
PART 4 ADDITIONAL REQUIREMENTS (NOT USED)

END OF SECTION
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT WIND DESIGN CRITERIA
DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 88 15-1
SECTION 01 88 15

WIND DESIGN CRITERIA
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Wind design criteria for the following:

1. For the design, anchorage and bracing of architectural/mechanical/HVAC/electrical components, equipment, and systems, and non-building structures, as specified in Section 01 73 23.

2. Other structures or items as specified or indicated on the Drawings.

B. Submittals and other requirements shall be as required in Section 01 73 23.

C. Related Sections: NOT USED

1. Section 01 73 23 – Bracing and Anchoring
D. Definitions: The following definitions are used throughout this specification section:

1. CONTRACTOR: The Design-Builder for the Dewatering Project

2. ENGINEER: The Design-Builder’s Engineer serving as the Engineer-of-Record for the Dewatering Project

1.3. CITY: The City of San Jose, its staff, and representatives

1.02 REFERENCES
A. 2019 California Building Code (CBC).

1.03 SYSTEM DESCRIPTION
A. Design Requirements:

1. Design of wind loads for Structures other than Tanks: In accordance with 2016 2019 California Building Code (CBC), Section 1609 – Wind Loads, with design parameters listed below:
a. Ultimate Design Wind Speed: 115 miles per hour
b. Wind Exposure: C.
c. Wind Importance Factor, I: 1.15
d.c. Load Combinations: In accordance with 2013 2019 CBC 1) Section 1605.2, Load combinations using strength design; or 2) Section 1605.3.1, Basic load combinations using allowable stress design

2. Design of wind loads for Tanks: In accordance with AWWA D100-0511, Section 3 – General Design, with the design parameters listed below:
a. Ultimate Design Wind Speed: 115 miles per hour.
b. Wind Exposure: C.
c. Wind Importance Factor, I: 1.15
d.c. Load Combinations: In accordance with 2013 2019 CBC.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT WIND DESIGN CRITERIA
DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 88 15-2
1) Section 1605.3.1, Basic load combinations using allowable stress design.

3. Anchorage to Concrete: In accordance with 2013 2019 CBC, 1908 or 19091901.3. a. No one-third increases in the allowable loads of Table 1908.2 are permitted when using 2010 CBC, 1908.
a. Post-installed anchors must comply with ICC-ES AC193 and AC308.

B. Resistance Requirements:

1. Wind loads must be resisted by assemblies of welded plates, and anchor bolts embedded in concrete or bolts fastened to steel frames. All steel assemblies, anchor bolts and fasteners shall be of Type 316 Stainless Steel, unless otherwise indicated on Drawings.

2. Wind loads must be resisted by direct bearing on anchors. Do not use connections in which forces are developed by friction in any part.

3. Anchor bolts shall have a standard hex bolt head unless otherwise indicated on Drawings

4. Do not use: sleeve anchors, concrete anchors, chemical anchors, flush shells, power actuated fasteners, screws or other types of anchors unless indicated on the Drawings or accepted in writing by the ENGINEER
a. Do not use anchor bolts fabricated from rod stock with an L or J shape. b. Wind forces must be resisted by direct bearing on the anchors used to resist wind forces. Do not use connections which use friction to resist wind forces.

1.04 SUBMITTALS PREPARATION REQUIREMENTS
A. Calculations and Reference Drawings: Complete calculations and reference drawings.

1. Calculations shall be comprehensible and complete. When evaluating the structural strengths, indicate stress for comparing with strengths or show Demand/Capacity ratio in the structural elements. Evaluating the results by stating “Okay by Inspection” may not be acceptable. When spread sheets are used, reference equations and formulas found in calculations.

2. Reference drawings shall include plans, sections, details and equipment information as necessary for seismic calculations. Indicate the location of the equipment on plan which is necessary for load calculations.

3. Submittals shall be returned without review if:
a. Submittals include only calculations without reference drawings b. Calculations have no sheet numbers or sheets are missing c. Calculations or reference drawings are illegible
d. Calculations are made based on wrong information, assumptions or design parameters
e. Information in reference drawings is insufficient for calculations or review B. Calculations shall be prepared, stamped, signed and furnished by a Professional Civil or Structural Engineer licensed to practice in the State of California.

1. Qualification of Civil or Structural Engineer: Minimum of three (3) years of experience in water, wastewater or similar public works projects.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

CITY OF SAN JOSÉ

ENVIRONMENTAL SERVICES DEPT WIND DESIGN CRITERIA
DIGESTED SLUDGE DEWATERING PROJECT PROJECT NUMBER: 7758 01 88 15-3

2. The Civil or Structural Engineer shall be responsible for obtaining all necessary reference drawings and data from the CONTRACTOR or Manufacturer for his or her calculations.

C. Calculations shall be independently checked by a Professional Civil or Structural Engineer licensed to practice in the State of California.

1. Qualification of Civil or Structural Engineer: Minimum of three (3) years of experience in water, wastewater or similar public works projects.

PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
PART 4 ADDITIONAL REQUIREMENTS (NOT USED)

END OF SECTION
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 4B

DPS DESIGN DOCUMENTS
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 4
Dewatering Facility at the San Jose- Attachment 4B
Santa Clara Regional Wastewater Facility DPS Design Documents 3643403.6 042907 CTR
ATTACHMENT 4B

DPS DESIGN DOCUMENTS
The following Definitive Project Submittal (DPS) drawings and specifications are incorporated by reference into this Amended and Restated Design-Build Contract and are on-file in a separate volume with the City:

1. Attachment 4B-1: Digested Sludge Dewatering Facility (CPMS No. 7758) Drawings prepared by Walsh and Black & Veatch Corporation, dated September 2021; and

2. Attachment 4B-2: Specifications for San Jose-Santa Clara Regional Wastewater Facility, 7758 – Digested Sludge Dewatering Facility Project.

The Division 01 specifications used in the attached DPS specifications (Attachment 4B-2) were preliminary. The Division 01 specifications included in Attachments 4A to this Appendix, Attachment 5A to Appendix 5 (General Design-Build Work Requirements), Attachment 6A to Appendix 6 (Design-Build Quality Assurance and Quality Control Requirements), Attachment 7A to Appendix 7 (Design-Build Work Review Procedures) and Attachment 9A to Appendix 9 (Commissioning and Acceptance) shall govern.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 4C

DPS COST MODEL, AS REVISED, AND DPS ASSUMPTIONS,

CLARIFICATIONS AND EXCLUSIONS
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Appendix 4
City of San Jose Attachment 4C
Dewatering Facility at the San Jose- DPS Cost Model, as Revised, and Santa Clara Regional Wastewater Facility DPS Assumptions, Clarifications and Exclusions 3643403.6 042907 CTR
ATTACHMENT 4C

DPS COST MODEL, AS REVISED, AND DPS ASSUMPTIONS,

CLARIFICATIONS AND EXCLUSIONS
The cost model line items included in this Attachment are provided for clarity on the scope of the Dewatering Project and inclusion of Project elements and complement the Definitive Project Submittal (DPS) drawings and specifications in Attachment 4B to this Appendix. [ATTACHED]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount 01 Allowances

01.05.0010 SECI Mtg Allowance 1.00 AL01.05.0011 Lab Equipment Allowance 1.00 AL02.20.0100 City Trailer and Walsh Trailer Allowance 1.00 AL

02.20.1004 Restore Dewatering Site and Curb Allowance 1.00 AL

02.40.2016 Additional Contaminated Soil Haul Off 1.00 AL12.50.0010 Dewatering Building Furnishings 1.00 AL 05 Phase II ESDC / QA-QC / General

01.05.0002 Phase II ESDC 1.00 ls01.05.0003 Permits 1.00 ls

01.05.0004 Phase II QA/QC Program 1.00 ls01.05.0005 Partnering 1.00 ls01.05.0006 Extended Preliminary Services 1.00 ls 10 Site Development - SJ RWF

01.99.0000 Construction Equipment 1.00 ls02.10.0005 RWF Site (6) DD to Common Trench 3,600.00 lf

02.10.0015 RWF Site (1) 10" WTR4 160.00 lf02.10.0025 RWF Site (1) 12" WTR3 (Future Connection Point) 22.00 lf02.10.0030 RWF Site (6) G Street Common Trench 7,800.00 lf02.10.0031 RWF Site Demo and Replace SDs Across G Street 56.00 lf02.10.0036 RWF Site Support Existing Utlities between G Street to EBOS 21.00 ea02.10.0045 RWF Site (4) Common Trench to Headworks Tie-in 850.00 lf

02.10.0050 RWF Site (3) Common Trench to DS Storage 580.00 lf02.10.0111 Asphalt Paving - G Street Utilities 42,500.00 sf02.10.0112 Demo Asphalt Road 661.00 cy02.10.0148 Curb and Gutter 675.00 lf02.10.0150 Agg Base Road To Facilitate G Street Sequencing 221.00 cy

02.10.7055 RWF Site (1) 12" DS OF to New Manhole 60.00 lf26.10.0001 Electrical - U/G FEEDERS M4 to J-Box (In Existing Conduits) 1.00 ls

40.10.0005 8"/10"-DS-DIP (From Digesters 9,10,11,15,16) 24.00 lf40.10.0010 8"/10"-DS-DIP (From Digesters 12,13,14) 194.00 lf

40.10.0015 8"/10"-DS-DIP (Transfer Pump Intake Piping) 36.00 lf40.10.0020 6"/8"/10"-DS-DIP (Transfer Pump Discharge Piping) 45.00 lf40.10.0030 3/4" Seal Water Supply 60.00 lf40.10.1000 Area 10 Pipe Supports 130.00 ea40.10.7145 1"-WTR3-CU3 (Hose Bibs At Sludge Storage Pumps, 3 Locations) 90.00 lf

40.10.7150 10"-DS-DIP (DS Tank No. 01 Single Point Failure) 25.00 lf

40.10.7155 10"-DS-DIP (DS Pipe Rack Piping Air Vacs) 176.00 lf 20 Site Development - SJ Dewatering Facility

02.20.0001 Chain Link Fence 630.00 lf02.20.0002 Asphalt Paving - Sludge & Dewatering Sites 66,116.00 sf

02.20.0003 Landscaping Allowance 16,654.00 sf

02.20.0010 DW Site - (2) Centrate to Common Trench 114.00 lf02.20.0012 Profile Roads 1,506.00 cy02.20.0015 DW Site (2) 10" TRS to Common Trench 248.00 lf DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount

02.20.0020 DW Site - (5) 1st Common Trench 1,500.00 lf

02.20.0025 DW Site Common WTR Trench to DD @ Zanker 795.00 lf02.20.0030 DW Site (1) WTR1 570.00 lf02.20.0032 DW Site WTR1 Air Gap Pad 1.00 ea02.20.0035 DW Site to RWF Site DD Under Zanker 3,500.00 lf02.20.0036 DW Site Common Trench to Guard Shack 150.00 lf02.20.0037 DW Site (4) Common Trench to Dewatering Building 220.00 lf

02.20.0038 Fire Loop 515.00 lf

02.20.0039 DW Site (1) WTR3 183.00 lf02.20.0040 DW Site (1) Site Storm Drains 1,450.00 lf02.20.0043 Excavation @ Transformer Area 36.00 cy02.20.0044 Hooded Inlets <4' bgs (North Side) 4.00 ea02.20.0045 Hooded Inlets >4'bgs (South Side) 4.00 ea02.20.0046 Graded Inlet 3' bgs (between Truck L/O and DW Bldg) 2.00 ea02.20.0051 Manholes 2.00 ea02.20.0052 San Sew & Plant Drain Lift Pump Stations 2.00 ea

02.20.0055 DW Site (1) Sanitary Sewer 420.00 lf02.20.1002 Additional Excavation For Sumps, Elevator Pit, Supports For Dewatering Slab 95.00 cy02.20.1005 Backfill Around Dewatering Building SOG 367.00 cy02.20.6205 Truck Wash 2,950.00 sf02.20.7002 Additional Pavement and Curb & Gutter on South Side of Dewatering Site 2,400.00 sf

03.20.0029 Transformer Slab 78.00 cy03.20.0030 Transformer Pads 4.00 cy03.20.0043 Bulk Chemical Truck Spill Containment Slab 85.00 cy03.20.0047 Concrete Washout 130.00 ea03.20.0050 Curb & Gutter, Sidewalks (Dewatering Site) 12,300.00 sf03.20.0052 Guard Shack Foundation Pads 6.00 cy03.20.0054 Bollards 70.00 ea05.20.0002 Dewatering Site Misc Metals 1.00 ls09.20.0002 Site Painting and Coatings 1.00 ls

13.20.0002 Pre-Engineered Guard Building 1.00 ea13.20.0004 Pre-Engineered Canopy at Air Gap 360.00 sf

26.20.0001 Electrical 1.00 ls26.20.0010 Guard Shack Electrical 1.00 ls40.20.0005 Stormwater Pump Station Piping 42.00 lf40.20.7180 6"/12"-SWPS-DIP (Stormwater Pump Station Want Piping Aboveground) 58.00 lf42.20.0003 Storm Drain Pump Station 1.00 ea42.20.0005 Air Gap System 1.00 ea 40 Solids Storage and Sludge Pump Station

01.99.0000 Construction Equipment 1.00 ls02.03.0010 RWF Site - Relocate Existing 1 1/2" WTR1 300.00 lf02.03.0150 Stone Columns @ Sludge Storage Tanks 10,160.00 lf02.40.2005 Strip Top Soil (6") 336.00 cy02.40.2008 Demolition - Sludge Storage 141.00 cy02.40.2009 Clear & Grub - Sludge Storage 22,161.00 sf DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount

02.40.2010 Structure Ex @ Sludge Storage Tanks 1,786.00 cy

02.40.2011 Structure Ex @ Sludge Storage Electrical Building (New) 81.00 cy02.40.2012 Profile Roads 178.00 cy02.40.2013 Structure Ex For Various Support Pads 37.00 cy

02.40.2014 Structure Ex For Pump SOG 33.00 cy02.40.2015 Contaminated Soil Haul Off02.40.6105 RWF Site (2) DS Transfer Alternative 1,100.00 lf02.40.7002 10" TRS Underground (TRS Transport Pumps discharge Piping Single Point) 130.00 lf02.40.8002 6" PD at Transport Pump Station03.40.0001 Concrete Washout 18.00 ea

03.40.0025 Digested Sludge Mixing and Pump Station SOG 75.00 cy03.40.0026 Mixing & Pump Station Equipment Pads 2.00 cy03.40.0038 Electrical Bldg. Footing 16.00 cy03.40.0040 Electrical Bldg. Stem Wall 14.00 cy03.40.0042 Electrical Bldg. SOG 19.00 cy03.40.0046 Digested Sludge Transfer Pump Pad 9.00 cy03.40.0048 Pipe Rack Foundations 24.00 cy03.40.0049 Pipe Rack CIP Columns 8.00 cy05.40.0004 Structural Steel Pipe Rack to Digesters 3.00 tn05.40.0006 Electrical Building Railings 20.00 lf05.40.0010 Electrical Building Stairs 40.00 lf09.40.5000 Painting at Sludge Storage 1.00 ls26.40.0001 Sludge Pump Station - ELECTRICAL 1.00 ls40.40.0030 10"-DS-DIP (DS Piping Tank No. 01) 30.00 lf40.40.0035 10"-DS-DIP (DS Piping Between Tanks) 86.00 lf40.40.0040 10"-DS-DIP (DS Piping Tank No. 02) 30.00 lf40.40.0045 6"/10"-DRS-DIP (DRS Mixing Pumps Piping Intake) 34.00 lf40.40.0050 4"/8"-DRS-DIP (DRS Mixing Pumps Piping Discharge) 51.00 lf40.40.0055 4"/10"-TRS-DIP (TRS Transport Pumps Discharge Piping) 56.00 lf40.40.0060 4"/12"-TRS-DIP (TRS Transport Pumps Intake Piping) 37.00 lf

40.40.0065 10"-TRS-DIP (TRS Transport Pumps To Distribution) 90.00 lf40.40.0070 12"-OF-DIP (OF Tank OverFlows) 104.00 lf40.40.0075 2"-D-GALV (OF Tank Overflows Drain) 10.00 lf40.40.0080 1.5"-WRT3-CU-3 (OF Tank Overlows WRT3 Feed) 30.00 lf40.40.0085 12"-DS-DIP (DS Inter Tank Connection Piping) 10.00 lf40.40.0090 12"-TRS-DIP (TRS From Tanks Piping) 15.00 lf40.40.0095 8"/10"-DRS-DIP (DRS To/From Tanks Piping) 62.00 lf40.40.0100 8"/10"-DRS-DIP (DRS Tank Internal Piping Tank No. 01) 100.00 lf40.40.0105 8"/10"-DRS-DIP (DRS Tank Internal Piping Tank No. 02) 100.00 lf40.40.0110 12"-TRS-DIP (TRS Tank Internal Piping Tank No. 01) 30.00 lf40.40.0115 12"-TRS-DIP (TRS Tank Internal Piping Tank No. 02) 30.00 lf40.40.0120 6"-DG-SSTL (DG From Existing To Tanks 1& 2) 200.00 lf40.40.0130 3/4" Seal Water Supply 120.00 lf40.40.1000 Area 40 Pipe Supports 196.00 ea40.40.6150 5th Street Alternate Piping 100.00 lf DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount

40.40.7160 10"-TRS-DIP (TRS Transport Pumps Discharge Piping Single Point Failure) 45.00 lf

43.40.0003 Recessed Impeller -TRANSFER Pumps - DS Pump Station 3.00 ea43.40.0004 Helical Screw TRANSPORT Pump Station Pumps 3.00 ea43.40.0005 Chopper Pumps - Sludge MIXING Pumps 3.00 ea43.40.0035 Digester Gas Roof Equipment 10.00 ea43.40.0037 CONCRETE TANKS - 2 ea x 687,000 Gallon 2.00 ea 50 Dewatering Building

01.99.0000 Construction Equipment 1.00 ls03.50.0001 Dewatering Bld SOG 744.00 cy03.50.0002 Dewatering Bld Column 27.00 cy03.50.0003 Dewatering Bld Entry Soffit Slab 5.00 cy03.50.0004 Dewatering Bld Walls 366.00 cy03.50.0005 Centrate Wetwell SOG 52.00 cy

03.50.0006 Centrate Wetwell Walls 74.00 cy03.50.0007 Centrate Wetwell Suspended Slab 24.00 cy03.50.0010 Dewatering Bld Misc Pads 1st Floor 2.00 cy03.50.0011 Dewatering Bld Containment Wall - Interior 14.00 cy03.50.0012 Dewatering Bld 2nd Floor EL31.00 442.00 cy03.50.0013 Dewatering Bld Centrifuge Supports 27.00 cy03.50.0014 Polymer Containment Walls - Exterior 14.00 cy03.50.0015 Polymer Containment Slab - Exterior 133.00 cy03.50.0029 Grout Fill Centrate Wet Well 6.00 cy

03.50.0030 Concrete - Polymer Tank and Pump Pad 102.00 cy03.50.0031 Concrete - Sludge Grinder Equip Pad 1.00 cy

03.50.0032 Concrete - Sludge Pump Equip Pad 5.00 cy03.50.0033 Concrete - Polymer Blending Equip Pad 18.00 cy03.50.0035 Elevator Pit - Slab 21.00 cy03.50.0036 Elevator Pit - Walls 3.00 cy03.50.0038 Dewatering Bld 2nd Floor Column Pedestals 13.00 cy03.50.0041 Elevator 2nd Floor Wall 32.00 cy03.50.0042 Foul Air Fan Pads 8.00 cy03.50.0043 1st Floor Interior Walls 49.00 cy03.50.0044 2nd Floor Interior Walls 9.00 cy03.50.0045 Metal Pan Stair Concrete 2.00 cy03.50.0050 Centrate Pump Station Slab 39.00 cy03.50.0052 Centrate Pump Station Pads 2.00 cy

03.50.0070 Hydro Test Centrate Wetwell 2.00 ea03.50.0100 Dewatering Building Precast Hatch 5.00 ea05.50.0001 Dewatering Building Set Anchor Bolts and Grout Baseplates 224.00 ea05.50.0002 Dewatering Building High Roof Structural Steel 89.50 tn05.50.0004 Dewatering Building Low Roof Structural Steel 14.50 tn05.50.0006 Dewatering Building Metal Panel Support Steel 26.00 tn05.50.0008 Dewatering Building Glazing Support Steel 2.50 tn

05.50.0010 Dewatering Building South Stair Structural Steel 14.50 tn05.50.0012 Dewatering Building South Stair Catwalk 3.00 tn DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount

05.50.0014 Dewatering Building High Roof Joists 13.00 tn05.50.0016 Dewatering Building Low Roof Joists 3.00 tn05.50.0018 Dewatering Building Roof Opening Support 2.00 tn05.50.0022 Dewatering Building Rooftop Mech Support 2.00 tn

05.50.0029 Dewatering Building Metal Roof Deck 9,113.00 sf05.50.0032 Dewatering Building South Stair 9.00 fl05.50.0034 Dewatering Building Entry Stair 4.00 fl05.50.0036 Dewatering Building Platform Stairs 50.00 lf05.50.0050 Dewatering Building Misc Metals 18,226.00 sf05.50.0052 Dewatering Building Maintenance Catwalk Grating 58.00 sf05.50.0054 Dewatering Building Centrifuge Platform Grating 3,201.00 sf05.50.0055 Dewatering Building Centrifuge Platform Structure 5.00 tn

05.50.0056 Dewatering Building Aluminum Railings 1,291.00 lf05.50.0058 Dewatering Building South Stair Screen 1,260.00 sf

05.50.7002 Dewatering Building Hatch Railings 50.00 lf05.50.7004 Steel Subcontractor Bond05.50.7006 Steel Subcontractor Voluntary Alternates06.50.0002 Dewatering Building Rough Carpentry 18,226.00 sf

06.50.0053 Dewatering Building FRP Grating 3,116.00 sf07.50.0002 Dewatering Building Metal Panels 10,741.00 sf07.50.0004 Dewatering Building Roof 10,930.00 sf07.50.0010 Dewatering Building Joint Sealants 18,226.00 sf

07.50.0020 Dewatering Building Firestopping 402.00 lf07.50.7002 Dewatering Building Interior Insulation 5,429.00 sf07.50.7004 Dewatering Building Exterior Insulation 2,392.00 sf08.50.0002 Dewatering Building Translucent Panels 2,280.00 sf08.50.0003 Dewatering Building Skylight 49.00 sf08.50.0004 Dewatering Building Channel Glass 2,328.00 sf08.50.0005 Dewatering Building Overhead Door 2.00 ea08.50.0006 Dewatering Building Storefront Entry 166.00 sf

08.50.0008 Dewatering Building Punched Opening Windows 64.00 sf

08.50.0010 Dewatering Building Doors, Frames, and Hardware 26.00 ea08.50.0012 Dewatering Building Interior Glazing 485.00 sf08.50.0015 Dewatering Building Construction Doors 7.00 ea

09.50.0000 Dewatering Building Floor Prep 7,761.00 sf09.50.0006 Dewatering Building Drywall 9,471.00 sf09.50.0007 Dewatering Building Acoustical Ceilings 1,590.00 sf09.50.0008 Dewatering Building Painting and Coatings 18,226.00 sf09.50.0010 Dewatering Building Wet Well Coating 3,328.00 sf

09.50.0012 Dewatering Building Concrete Floor Sealer 12,138.00 sf

09.50.0013 Dewatering Building Sound Absorption Panels 4,641.00 sf09.50.0014 Dewatering Building Hard Tile 4,319.00 sf09.50.0016 Dewatering Building Resilient Flooring 988.00 sf09.50.0060 Dewatering Building Parapet Infill 1,817.00 sf

10.50.0002 Dewatering Building Specialties 1.00 ls
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount

10.50.0004 Dewatering Building Toilet and Shower Accessories 18,226.00 sf

11.50.0001 Dewatering Building Appliances 8.00 ea12.50.0002 Dewatering Building Break Room Casework 84.00 lf

12.50.0004 Dewatering Building Lab Casework 81.00 lf12.50.0006 Dewatering Building Lab Equipment 1.00 ls13.50.0001 Dewatering Building Engineered Canopies 1,716.00 sf21.50.1393 Fire Protection 17,974.00 sf22.50.0001 Plumbing Subcontractor 1.00 ls22.50.0002 Neutralization Tank Vault 2.00 ea26.50.0001 DEWATERING BUILDING ELECTRICAL 1.00 ls40.50.0005 4"/10"-CEN-DIP (Centrate Pumps Intake Piping) 40.00 lf40.50.0010 4"/8"/12"-CEN-DIP (Centrate Pumps Discharge Piping) 134.00 lf40.50.0015 6"/10"-TRS-DIP (Centrifuge Pumps Intake Header Piping) 124.00 lf40.50.0020 6"/10"-TRS-DIP (Centrifuge Pumps Intake Piping) 150.00 lf

40.50.0025 6"/10"-TRS-DIP (Centrifuge Pumps Discharge Header Piping) 62.00 lf

40.50.0030 6"/10"-TRS-DIP (Centrifuge Pumps Discharge Piping) 326.00 lf40.50.0031 1"/2"-SA-GALV (Centrate Piping Sample From Point To Sinks) 240.00 lf40.50.0035 14"-CEN-DIP (Centrate Overflow Line) 45.00 lf40.50.0040 4"/6"/8"/10"-WRT3-DIP (WTR3 Dewatering Building 1st Floor) 203.00 lf

40.50.0045 4"/6"-WRT3-DIP (WRT3 Dewatering Building 2nd Floor) 103.00 lf40.50.0050 2"-POL-PVC (Polymer Storage Tank Level Indicators) 12.00 lf40.50.0055 6"-POL-PVC (Polymer Storage Tank Vents) 16.00 lf

40.50.0060 4"-POL-PVC (Polymer Storage Tank Cross Connection) 50.00 lf40.50.0065 2"-POL-PVC (Polymer Storage Tank Drains) 40.00 lf

40.50.0070 3"-POL-PVC (Polymer Storage Tank Fill Lines) 82.00 lf40.50.0075 3"-POL-PVC (Polymer Storage Recirculation System) 236.00 lf40.50.0080 6"-POL-PVC (Polymer System Suction Line) 130.00 lf

40.50.0085 2"/6"-POL-PVC (Polymer Dilution Line) 450.00 lf

40.50.0090 6"-POL-PVC (Polymer Feed Line) 395.00 lf40.50.0095 4"/8"-WRT3-DIP (Polymer Feed WTR3 Supply) 128.00 lf40.50.0100 1"/1.5"-IPA-CU3 (Pneumatic Valves Air Supply Piping & System) 538.00 lf40.50.0105 8"/14"-CEN-PVC (Centrate Drain line To Wetwell) 390.00 lf40.50.0110 2.5"-PD/SS-CSTL (Process & Sanitary Sewer Drain Pump Station & Piping) 163.00 lf40.50.0115 4"/6"-PD-PVC (2nd Floor Drains) 247.00 lf

40.50.0125 3/4"/1"/2"-WTR3-GALV (WTR3 Feed To Centrifuges 1-4) 440.00 lf

40.50.0135 2"/3"-WTR3-PVC (WTR3 To Centrate Tanks) 40.00 lf40.50.0140 Centrate Tank Level Transmitters 48.00 lf40.50.0145 1/2"-3"-WTR3-CU3 (Service Water Feed) 744.00 lf

40.50.050 DEWATERING BUILDING - HVAC SUB 18,226.00 sf

40.50.1000 Area 50 Pipe Supports 447.00 ea40.50.7165 10"-TRS-DIP (Centrifuge Pumps Intake Header Piping Single Point Failure) 45.00 lf

40.50.7170 8"/14"-CEN-PVC (Centrate Drain Line To Wetwell Reroute & Single Point Failure) 50.00 lf40.50.7175 4"/8"/12"-CEN-DIP (Centrate Pumps Discharge Piping Air Vacs) 38.00 lf

40.50.7190 6"-POL-PVC (Polymer Suction Alternate Feed) 110.00 lf

40.50.8185 4"-TRS-DIP (Blowoff To Centrate Wetwell)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount

42.50.4241 ELEVATOR 1.00 ls42.50.4630 BRIDGE CRANE 1.00 ea43.50.0001 Polymer System & FRP Bulk Tanks 2.00 ea43.50.0002 CENTRIFUGE 4.00 ea43.50.0007 SHAFTLESS SCREW CONVEYORS 636.00 lf

43.50.004 Stainless Slide Gate - Centrate Wet Well 1.00 ea43.50.014 Centrate wet well Pumps - 15 HP 3.00 ea43.50.015 Prog. Cav. CENTRIFUGE FEED PUMPS - 40 HP 4.00 ea

43.50.016 INLINE SLUDGE GRINDERS - 5 HP 4.00 ea43.50.017 Instrument Air Compressor 1.00 ea 60 Electrical Building

03.60.0024 Electrical Room SOG 153.00 cy03.60.0025 Electrical Room Wall 104.00 cy03.60.0026 Electrical Room Suspended Slab 88.00 cy

03.60.0027 Electrical Room Equipment Pads 7.00 cy03.60.0028 Electrical Room Roof Walls and Conveyor Support 18.00 cy03.60.0029 Electrical Room Roof Pads 10.00 cy03.60.0030 Electrical Room Roof Stair Pad 4.00 cy

03.60.0031 Electrical Room Stair Pad 4.00 cy03.60.0032 Conveyor/Stair Cross-Over Pad 3.00 cy

05.60.0002 Electrical Building Screen Wall Supports 1.50 tn05.60.0004 Electrical Building Screen Wall Fabric 580.00 sf05.60.0005 Electrical Building Stair Supports 1.00 tn05.60.0006 Electrical Building Conveyor Support Bridge Steel and Stair 10.50 tn05.60.0009 Electrical Building Set Screen Wall Support Anchor Bolts 1.00 ls05.60.0010 Electrical Building Railings 1.00 ls05.60.0036 Electrical Building Stairs 108.00 lf06.60.0002 Electrical Building Rough Carpentry 108.00 lf07.60.0000 Electrical Building Roof 1,988.00 sf07.60.0002 Electrical Building Scupper and Downspout 3.00 ea08.60.0002 Electrical Building Doors 2.00 ea08.60.0003 Electrical Building Construction Doors 4.00 ea

09.60.0009 Electrical Building Painting 1,988.00 sf10.60.0001 Electrical Building Specalties 1.00 ls21.60.0001 Electrical Building -Fire Protection SUB 1,831.00 sf

26.60.0001 Electrical Building - ELECTRICAL SUB 1.00 ls40.60.5002 Electrical Building - HVAC SUB 1.00 ls 70 Truck Loadout Building

03.70.0014 Loadout Bld and Stair SOG 755.00 cy

03.70.0015 Perimeter Wall 11.00 cy03.70.0028 Column Pedestals 8.00 cy03.70.0029 Bin Pedestals 14.00 cy03.70.0030 Scale Pedestals 4.00 cy03.70.0047 Truck Loadout Air Handler Pad 7.00 cy

03.70.0100 Truck Loadout Set Column Baseplate Anchor Bolts 128.00 ea DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Digested Sludge Dewatering Facility Project - CIP Project #7758 Definitive Project Submittal GMP Cost Model - Level 2
DPS Negotiation Revision 2 (11-16-2021)
BID ITEM AREA Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Total Amount

05.70.0002 Truck Loadout Structural Steel 85.75 tn05.70.0004 Truck Loadout Enclosure Support Steel 20.00 tn05.70.0006 Truck Loadout Stair Structural Steel 14.50 tn05.70.0008 Truck Loadout Metal Roof Deck 2,274.00 sf05.70.0010 Truck Loadout Egress Stairs 5.00 fl05.70.0012 Truck Loadout Odor Control Ductwork Structural Steel 4.00 tn05.70.0014 Truck Loadout Railings 169.00 lf05.70.0016 Truck Loadout Parapet Infill 1,280.00 sf05.70.7002 Truck Loadout Cake Bin Handrail 412.00 lf06.70.0002 Truck Loadout Rough Carpentry 320.00 lf06.70.0004 Truck Loadout FRP Gratings 1,864.00 sf07.70.0002 Truck Loadout Metal Panels 7,454.00 sf

07.70.0004 Truck Loadout Roof 1,674.00 sf07.70.7002 Truck Loadout Scupper and Downspout 6.00 ea08.70.0002 Truck Loadout Doors 4.00 ea08.70.0003 Truck Loadout Construction Doors 4.00 ea08.70.0005 Overhead Doors 4.00 ea08.70.7002 Truck Loadout Glazing 32.00 sf09.70.0010 Painting and Coatings 1.00 ls10.70.0001 Truck Loadout Building Specialties 1.00 ls23.70.5002 HVAC SUB - Truck Load-out Bldg 1.00 ls26.70.0001 Truck Loadout - ELECTRICAL SUB 1.00 ls40.70.0002 Truck Loadout Process Trench Drains 266.00 lf40.70.0005 1/2"-3"-WTR3-CU3 (Service Water Feed) 250.00 lf43.70.0008 TRUCK SCALES 2.00 ea43.70.0009 CAKE STORAGE BINS 4.00 ea 80 Commissioning and Start-Up

01.80.0001 Commissioning and Startup Allowances 1.00 ls26.80.0001 Commissioning & Start-up -ELECTRICAL SUB 1.00 ls DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Project Definitive Submittal
City of San Jose – Digested Sludge Dewatering Facility
Digested Sludge Dewatering Definitive Project
Submittal
Summary of Assumptions, Clarifications and Exclusions
October 1st, 2021
Prepared By:

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Project Definitive Submittal
City of San Jose – Digested Sludge Dewatering Facility
Digested Sludge Dewatering Facility Definitive Project
Submittal
Summary of Assumptions, Clarifications and Exclusions
October 1st, 2021
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Project Definitive Submittal
City of San Jose – Digested Sludge Dewatering Facility

1.0 Introduction
The following is a summary of key assumptions that have been included in the scope of the project or are specifically excluded from the project scope, schedule, and cost. The intent of this document is to summarize these items discussed throughout the evolution of the project and document decisions which are the basis of technical and commercial elements of the Definitive Project Submittal (DPS).

2.0 Assumptions, Clarifications and Exclusions
The team has prepared a summary of the relevant assumptions, clarification and exclusions that support the project documents. The lists are organized by the following subjects:
• Submittals
• Commercial
• Cost Assumptions Not Included in Design
• Cost and Construction
• Schedule
Also included is a summary of assumptions related to SECI inspections and involvements that are based on the discussions had to date with the City and SECI. The assumptions for each subject are included as attachments to this document.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Item Description
1 City of San Jose will receive all submittals for information only with the exception of the following select submittals that will be submitted to the City for review and approval:
- Landscaping
- Security Requirements
- Finishes (Chairs, Desks, Hardware, Millwork, Window Shades, Etc.) - Paint Colors
- Hazardous Material Plan (Contaminated Soils, etc.)
- FD - Fire Protection System
- Computer Hardware and Software - DCS Screen Displays
2 SECI review of submittals will be limited to the following deferred design submittals:
-Digested Sludge and Cake Loadout Building - Wall Panels and Panel Support steel -Guard Booth with Restroom
-Fiberglass Grating and Supports
HVAC Duct Supports and Bracing
Handrails
-Lightning Protection System
-DS Storage Tanks
-Fire Suppression System (Sprinkler System)
-Electrical Pre-Engineered Building
-Sludge Cake Bins and Supports
Submittals DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Item Description
1 Walsh will hold one pre-construction meeting for phase 2 work with SECI to confirm inspection requirements 2 Base schedule is based on a Mon-Fri schedule with 8-hr/workdays. 3 Tax rate of 9.375 percent has been applied to all material and equipment 4 All construction utility usage through City connection (i.e. power, non-potable, recycled water, potable water for construction usage) is to be provided to the Design Builder by City at no cost.
5 Walsh cost assumes plant operators will be actively involved in commissioning and acceptance testing at the direction of Walsh. 6 GMP is based on self-performing the following scopes of work: underground process piping and trenching, civil excavation and backfill, concrete, exposed process piping and pipe supports, process mechanical equipment and commissioning. 7 Walsh reserves the right to confirm vendor and subcontractor bid prices after City issuance of contract amendment to validate bid prices used as the basis of GMP, consistent with the technical requirements of the 100% design documents 8 Walsh assumes that all subcontractors that were or may be pre-qualified through Walsh pre-qualifications process are "City approved contractors" 9 Walsh reserves the right to award subcontract to any "City approved contractors" after issuance of contract amendment based on validation of bid prices. 10 Any savings/loss of bid confirmation after contract amendment would be handled through the contingency budget allocated within the GMP. 11 Walsh has assumed that any changes to OCIP insurer will not modify OCIP requirements. 12 Walsh assumes SECI review of deferred design submittals only to confirm adherence to applicable code requirements and use of proper seismic design parameters and assumes 2 week review period.
13 GMP includes:

1. items identified as cost adders based on 60% design comments and agreed responses as document in file dated 8/27.

2. Comments provided by city as part of 60% that included backchecked responses will be incorporated into the final design documents

3. Any comment not backchecked is assumed that response was adequate and changes to be made at discretion of engineer of record 14 90% deliverable is assumed to reflect final design with changes based on client review to achieve 100% completion 15 Review of 90% documents by City assume a streamlined confirmation review to ensure the intent of the negotiated GMP is consistent and acceptable to the City and does not account for extensive review comments as shown in the P6 schedule 16 Walsh has no provisions for providing a security guard for site access control during construction for the dewatering site. 17 Walsh has excluded any cost for CM or OA construction trailer provisions 18 Walsh work hours assume normal work hours are from 6:00 A.M. to 6:00 P.M. 19 Walsh will not provide any permit(s) until after approval of Definitive Contract Amendment. 20 Walsh will not have any subcontractors under contract at the time of the pre-construction conference required by 01 31 19 1.03 C and therefore subcontractors will not be in attendance. Black and Veatch will be under contract and can attend if needed. 21 Walsh rates have been escalated to the mid point of construction 22 GMP does not include rework associated with requests for inspection by SECI after work has been completed and covered or enclosed. 23 30 days after project NTP, Walsh, Con J Franke, ABB, and the City elected representatives shall hold a commencement meeting confirming roles, responsibilities of expectations for the project.
24 No cost for transition services or post acceptance performance test 25 Float within the project schedule belongs to Walsh and is not assigned as project float. 26 Change orders or force account work per City of San Jose Department of Public Works - Standard Specifications July 1992 27 Division 01 specifications as provided by the City have been included; however, these specifications shall not supersede the prime agreement between Walsh and the City. Walsh assumes the following modifications to Division 01 in the 100% contract documents:
01 14 00 1.04 - Facility Access applies to scope of work performed on the west side of Zanker within the RWF and does not apply to the Dewatering site on the east side of Zanker 01 14 00 1.03 C - replace "7:00 A.M.-5:00 P.M." with "6:00 A.M.-6:00 P.M." 01 31 19 1.04 - Delete Complete
01 33 00, General Statement that hard copies shall not be provided, except for final O&M manuals 01 32 16 1.02 C and D - Delete
01 32 16 1.03 C - Delete
01 32 16 1.03 D - Delete "and two (2) hard copy print outs" 01 32 16 1.03 D.4 - Delete
01 32 16 1.04 D - Delete
01 32 16 1.04 H.2 and H.3, revise "30-calendar day duration" to "15-calendar day duration" 01 32 16 1.05 - Delete
01 32 16 1.06 - Delete
01 32 16 1.07 B - replace "[XX]" with "twenty (20)"
01 32 16 1.12 B - Delete
01 32 16 1.12 E - Delete
Commercial Terms DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Estimator Division Issue
Shea 3 Max CJ spacing is 60’ instead of 50’ as indicated in the specifications. This was confirmed as acceptable in emails to/from Black & Veatch.

Shea 3 Concrete mix designs do not include air entrainment.

Shea 3 Concrete mix designs include known cost increases at the end of this year.

Shea 3 Concrete mix designs include extra to account for additional admixtures needed to increase slump.

Shea 3 Assumption of 1’ slab thickness where not indicated for misc. site pads from 60% remains the same.

Turner 8 Overhead doors for loadout facility were specified as Rytec "turbo seals" but were not available in required size. Rytec Fast Seals are quoted. Spec will be updated to match.

Shea 26
Where flushing connections were required/shown to flush extremely long runs of piping, these connections were upsized from 1.5” to 3” materials. This will allow for faster flushing of these particularly long runs.

Shea 31 All excess spoils will be kept onsite. Stockpile locations to remain the same as those from 60%.

Shea 31 Recycled AB has been utilized to keep costs down when possible. Virgin AB has been used under structural slabs.

Maidrand 33
Alternative routing to the Directional drilling path and associated piping (TRS, CEN, WTR3, WTR4, SWPS) due to market feedback from Directional drilling subs on the feasibility of the work.

Shea 40 Supports are all hot dip galvanized except for those within the Sludge Storage Tanks.

Shea 40
Specifications allow for the use of grooved fittings. These are used where applicable. Specific guidance from designer and owner included flanged connections around equipment and valves.

Shea 40
Process air piping is only shown on the P&IDs. Lengths and number of fittings were based on the rough linear footage to where the air is needed and anticipated use of adjacent walls as much as possible
Shea 40
The 8”/14” centrate drain line shown under the 2nd Floor of the Dewatering building is labeled as DIP. Per discussions, this pipe was instead quantified as a SCH80 PVC line.

Shea 40
Additional pipe and fittings were included in the estimate to account for comments issued by owner regarding air releases, single points of failure, etc. These may have been included in DPS drawings. Final coordination will occur as part of 100% design.

Shea 40
No supports were shown outside a very select few. Type and number at this point were assumed based off current pipe routing and what was encountered on the active San Jose Digesters Project.

Shea 40 WTR3 source for Transfer Pump area at sludge storage will come from the lines within the utility tunnels.

Shea 40
Wall spools follow B&V standard details provided, Flange x PE with a weep ring. Exception to this and requested by the concrete tank manufacturer was to had a flush mounted flange x flange spool with tapped holes.

Shea 40
No mechanical drawings show the WTR3 feed to either the four centrifuges or the Centrate Wetwell. The mechanical drawings also do not show the level indicator piping arrangement for the Centrate Wetwell. Quantities for these activities were based off distances from connection point to connection point and a quantity of fittings was included based off anticipated routing.

Maidrand 40 Alternative routing of underground piping were given due to owner requests & cost savings Shea 42 Additional 4” line was included in the Dewatering building to serve as a blowoff from the TRS intake piping to the Centrate Wetwell.

Shea 43
No piping was shown for the seal water or service water at the Sludge Storage Area or the Transfer Pump Area. Quantities are based off of general location of final destination and where Walsh plans to tie-in to existing infrastructure.

Hudson 43
Seal Water stations are currently required in the specifications to be provided by the equipment supplier. The cost model shows this work as self perform by Walsh and the costs have been deducted from the equipment bids.

Hudson 46
The costs for the cake bins in the cost model include bolted/flanged/gasketed connections to simplify shipping, coating and minimize field erection labor and costs. The design specification will be modified for final design to reflect this acceptable modification.

Construction Costs and Assumptions not Included in Design DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Item Division Description
9 1 Walsh was unable to locate the existing Milpitas force main and has only accounted for limited potholing. Additional efforts may require contingency utilization. 11 1
Walsh has included MOPO and PSR's required for this project within the project schedule and assumes no limitations to work based on other projects the City is responsible to coordinate with.
12 1 Project GMP includes bid solicitations based on Program Automations Guidelines, version 7. Any changes based on subsequent revisions require a change. 17 1
Walsh assumes relocation of utility pole identified in design drawings located in proposed new entrance driveway to be paid for by City and completed prior to schedule activities related to roadway. Walsh will provide coordination with PGE but is not responsible for delays created by PGE execution of relocation 18 1 Walsh assumes no activities to be completed associated with decommissioning of the Digested Sludge Export Pumping Station (DSEPS) 19 1
Walsh assumes no changes to the design or operation of the remote digesters based on the design of the new transfer pump station or any aspect of the new dewatering facility.
20 1
Cost is inclusive of 2021 Caltrans rates for construction equipment. Equipment will be billed at standard 8-hr day for the time the equipment is on-site. No down time is accepted.
1 3 Formwork design may create minor adjustment to architectural appearance due to constructability requirements 6 8 NFPA 820 requirements per design documents confirmed by city with no changes. 15 8
WTR4 is to be used for fire protection at the dewatering facility with connection as and indicated in the design documents directed by City and will provide sufficient flow and pressure to meet City Fire Marshal requirements. No cost has been included to address any limitations in the existing systems. 16 8
Site circulation for dewatering facility assumes City responsible for coordination with modifications to access road serving AWPF and future Zanker Road widening and any changes to Dewatering project resulting from these efforts will be City responsibility 7 11 No maintenance tools will be provided by the Design Builder aside from those required by the technical equipment specifications 8 11 No laboratory equipment or consumables, other than the specified fume hood, will be provided. 5 26
Assumes fiber connection and pathways have sufficient capacity and are clear of any obstructions as such available pathways can be utilized to dewatering facility and storage area.
3 32 Minimum cover for utilities in roadway assumed to be 3' min 2 40 Walsh reserves the right to adjust as-designed pipe routing for all mechanical piping without compromising design intent. 4 40 Use of Pratt valves, consistent with Digesters Project is acceptable. 10 40 Walsh assumes revised directional drilling alignment to maintain minimum of 5' of clearance from bottom of 84" interceptor. 14 40 WTR3 is to be used for utility water with no additional treatment or provisions to address fouling due to organics 21 40
At connections to existing piping installed by others, Walsh will cap line prior to connection to test new piping. Once connection to existing piping is made, testing will be through visual, in service test for inspection only. Walsh will not be responsible for leakage occurring to existing piping. 22 40
All buried centrate piping installed by Walsh will be tested per specifications. It is assumed that the portion installed by the Headworks project will be tested independently and the final connection joint will be through visual, in service test only. 13 46 Polymer secondary dilution is not required to be operated or demonstrated in order to achieve contractual required performance requirements Cost and Constructability
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Item Description
1 Construction schedule is dependent on approval of 100% design as shown in CPM schedule 2 City review of 90% document is 1 week in duration due to over the shoulder review during 90% progression 3 Schedule allocates 2 week review and approval by SECI for 100% and issuance of building permits from submission of 100% construction documents 4 Walsh has assumed 20 weather days over the construction schedule. 5 Construction schedule is dependent on approval of Definitive Contract Amendment and Notice Proceed or before 3/22/22 6 Schedule assumes that Notice to Proceed is synonymous with Notice to Proceed with Construction. 7 Walsh schedule has only accounted for SECI review on 100% documents and deferred submittals as listed in the P6 schedule. No additional submittal reviews are assumed. 8 Walsh assumes that procurement release of material and equipment is dependent solely on approval by the EOR. 9 Walsh's GMP, schedule and equipment lead times do not account for any City or City representatives FAT witness testing. 10 Walsh will hold one meeting with SECI to kick off the project and communicate coordination efforts of inspection requirements for the entire project. 11 Construction schedule is dependent on Phase 2 construction NTP on or before 3/22/2022 as defined in P6, regardless of status of ATC 12 City is responsible for obtaining Permit to Operate from BAAQMD. As this is a City responsibility it is not a contractual activity related to the Design Builder, except as to help assist as indicated in the contract.
13 Walsh will not provide a standalone copy the Primavera software with a license for the City as currently required by 01 32 16 1.02 C and D. 14 Walsh has not assumed to include a schedule summary cost report by cost account as required by 01 32 16 1.04D 15 Walsh does not intend to provide the identification of the schedule execution specified by 01 32 16 1.04H.2 and 3 16 Delete 01 32 16 1.05 and 1.06
17 Delete 01 32 16 1.12 B and E
Schedule
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Discipline

4. Installation of electrical grounding ring and ground well.

5. Confirmation of clearances form panels and disconnects

1. See TM

1. In wall utilities prior to close up

2. Overall visual installation of final (supports, connections)

1. In wall utilities prior to close up

2. Overall visual installation of final (ductbank spacing, raceways, visual of terminations, disconnect locations and connections)

3. Installation approval for medium voltage transformers and low voltage switchgear

1. In wall utilities prior to close up

2. Overall visual installation of final (supports, confirmation of slope, connections)

3. Eyewash/shower/sink temperature verification

4. Access panel inspection and confirmation

1. Reinforcement prior to pour

2. Inspection of utilties prior to close up of wall

3. Access/Egress and ADA compliance

4. Structural steel member connetions

5. Final Occupancy
SECI Inspections
The following is a list of inspections that Walsh assumes will require SECI review and approval. All other inpsections (specification required, visual, special, etc.) are not assumed to require SECI approval.

Inspection Description

1. Yard Piping

2. Visual of tie in to existing connections
Civil
Building
Plumbing
Mech
(HVAC)
Electrical
Fire
Marshal
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 4D

CITY CLARIFICATION LETTERS ON THE DPS

AND DESIGN-BUILDER RESPONSES
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

Appendix 4
City of San Jose Attachment 4D
Dewatering Facility at the San Jose- City Clarification Letters on the DPS Santa Clara Regional Wastewater Facility and Design-Builder Responses 3643403.6 042907 CTR
ATTACHMENT 4D

CITY CLARIFICATION LETTERS ON THE DPS

AND DESIGN-BUILDER RESPONSES
Based on the review of the Definitive Project Submittal (DPS), the City issued four letters to the Design-Builder to confirm and clarify aspects of the DPS. The Design-Builder provided two letters with responses to those inquiries. The following Design-Builder response letters regarding the DPS are incorporated by reference into this Amended and Restated Design-Build Contract and are on-file with the City:

3. Design-Builder Response (Letter 219148-044), dated October 26, 2021, to the City’s Requests for Clarification and/or Clarifications #1 and #2; and

4. Design-Builder Response (Letter 219148-045), dated October 28, 2021, to the City’s Requests for Clarification and/or Clarifications #3 and #4.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 4E

DESCRIPTION OF WORK INCLUDED IN ALLOWANCE ITEMS
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 4
Dewatering Facility at the San Jose- Attachment 4E
Santa Clara Regional Wastewater Facility Description of Work Included in Allowance Items A4E-1
3643403.6 042907 CTR
ATTACHMENT 4E

DESCRIPTION OF WORK INCLUDED IN ALLOWANCE ITEMS
SECI MTG SUB-ALLOWANCE:

Scope associated with Project team participation and correspondence related to 100% design, third party submittals and inspection requirements.

LAB EQUIPMENT SUB-ALLOWANCE:

Sub-Allowance will be utilized to purchase and install equipment selected by City. Equipment shall only be held to standard manufacturer warranty. Any additional electrical requirements (i.e. additional electrical panels or outlets beyond what is shown in the DPS electrical design) is not included in this Sub-Allowance.

CITY TRAILER AND DESIGN-BUILDER TRAILER SUB-ALLOWANCE:

Scope associated with all costs in providing additional infrastructure, utilities and services, etc. for City and Design-Builder trailers to be installed on the north side of Tempco Area. All trailers will be demobilized prior to Final Completion. This includes items such as: (see Table A).

Table A - CITY AND DESIGN-BUILDER TRAILER SUB-ALLOWANCE MATRIX Trailer Sub-Allowance Costs Install
for
DesignBuilder
Monthly
DesignBuilder
Costs
Install
for
City
Monthly
City
Costs
X = COSTS TO BE APPLIED AGAINST SUBALLOWANCE
CM Trailer - 2 Wide (Mob, Demob, Install) - - x x
Management Design-Builder Trailer - 4 wide – (Mob,
Demob, Install) 1
x x - -
Office Furniture (4 wide trailer furniture to be
installed (labor for mobilization and demo)) and 2
wide trailer worth of new office furniture to be
purchased)
x - x -
Sanitary Service Install x - x -
Sanitary Service Monthly - - - x
Drinking Water Monthly - - - x
Trailer Cleaning Service Monthly - - - x
Internet Service Monthly - - - -
Office Supplies Monthly - - - -
Infrastructure / Utilities
Additional laydown and parking prep (compact,
geogrid, rock, including maintenance through project
duration, etc.)
x x2 x X2
Temp Power Infrastructure x - x -
Additional Tempco Fencing Modifications x - x -
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A4E-2
3643403.6 042907 CTR
Potable Water Line to Trailers x - x -
IT Service - Satellite Installation x - - -
IT Service - Fiber Installation? - - x -
City Office Furniture Request: - x
6 desks - x
2 dozen chairs - x
2 cubicles with built in desks & file cabinets - x
10 seat conference table - x
2 small tables - x
2 large & 2 small filing cabinets - x
1 large & 1 small bookcase - x
1 multi-function print/copy/fax machine - x x
1 small tabletop printer - x
1 large flat screen monitor for conference room - x
Refrigerator - x
Water cooler - x
Microwave - x
Coffee maker - x
Notes:

1. In respect to monthly cost: Cost will be derived for additional (difference only) monthly cost for a new 4 wide trailer once procured compared to the current RWF 4 wide trailer setup.

Demobilization of the 2 wide trailer at the current RWF site are included in the Sub-Allowance.

2. This cost includes maintenance required through the duration of the project (i.e. wet weather repair, etc.) for the additional area supporting the City trailer and Design-Builder management trailer in the area of TEMPCO north of the access road.

RESTORORATION OF DEWATERING SITE AND CURB SUB-ALLOWANCE:

Scope associated with existing curb restoration along G-street and 5th street that may need repair or replacement following construction. Additionally, City may elect to have geo-grid, fabric and stone removed from the laydown and parking areas. In that event, City shall so notify Design-Builder at least 120 days prior to Substantial Completion to allow reasonable time to perform Sub-Allowance work that may be performed before Final Completion. SubAllowance may also be used to pay cost for stabilizing stockpiled soil on main Dewatering Facility Site (east of Zanker only) and seeding or re-spreading topsoil.

ADDITIONAL CONTAMINATED SOIL HAUL OFF AND DISPOSAL SUB-ALLOWANCE:

Design-Builder’s Fixed Design-Build Price includes the cost for segregating, hauling off, and disposal of 820 cubic yards (CY) of lead contaminated soil at the roadway between G-street and EBOS. This Sub-Allowance can be used for additional quantities of lead contaminated soil haul off and disposal or for haul off and disposal of all or some portion of any other unexpected contaminated soil identified during Project construction.

DEWATERING BUILDING FURNISHINGS SUB-ALLOWANCE:

Sub-Allowance will be utilized to purchase and install building furnishings selected by City.

Scope associated with City selection such as tables, desks, chairs, refrigerator, microwave, stove, etc.

DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

A4E-3
3643403.6 042907 CTR
CITY TPAD SLUDGE SAMPLE TESTING SUB-ALLOWANCE:

Sub-Allowance will be used to pay for TPAD sludge sampling by Design-Builder and testing by an independent laboratory mutually acceptable to Design-Builder and City prior to starting Acceptance Testing. This Sub-Allowance also will be used to cover Design-Builder labor costs for ensuring proper chain of custody, and shipping of samples.

DEWATERING FACILITY SITE SIGNAGE SUB-ALLOWANCE:

Sub-Allowance will be used to pay for site signage including an entrance sign near Zanker Road and signage to direct traffic through the Dewatering Facility Site and Facility. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
ATTACHMENT 4F
60% DESIGN COMMENTS LISTS
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 3643403.6 042907 CTR
(This Page Intentionally Left Blank)
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.

City of San Jose Appendix 4
Dewatering Facility at the San Jose- Attachment 4F
Santa Clara Regional Wastewater Facility 60% Design Documents 3643403.6 042907 CTR
ATTACHMENT 4F
60% DESIGN COMMENTS LISTS
The attached 60% design comment log and responses by the Design-Builder are provided for clarification of scope for the Project. The comment log documents where modifications are to be incorporated as part of final design for the Dewatering Project. [ATTACHED]
DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 60% Bluebeam Studio Weekly Summary - Specifications
Digested Sludge Dewatering Facility Project (7758)
Reviewer Comments: 253
BV Responses: 254 100%
Backchecked Responses: 186 74%
ID Subject Page Label Comment Author Date Backchecked
2 Callout 7 Table of Contents items should be hyperlinked to the location in the document, its a requirement for Contractor to turn in O&M manual in that format Amit Mutsuddy 7/12/2021 11:20 Unchecked 3 Re: Callout 7 Documents are set up with bookmarks that will allow the reader to jump to whatever section they chose. This is an appropriate method for a PDF document as was discussed in the 7/13 review meeting M Wilson 7/23/2021 6:20 Unchecked 5 Callout 15 Did not see 40 90 in the specs. Seems to be missing Tim Lewis 7/23/2021 8:27 Unchecked 7 Highlight 18 . Access to the c Tim Lewis 7/23/2021 12:50 Unchecked 8 Highlight 18 construction site is through the FACILITY Main Gate f Tim Lewis 7/23/2021 12:50 Unchecked 9 Highlight 18 fo Tim Lewis 7/23/2021 12:51 Unchecked
10 Highlight 18 e FACILITY Main Gate Tim Lewis 7/23/2021 12:51 Unchecked 11 Text Box 18 Should this call the construction enabling gate or other as... Tim Lewis 7/23/2021 12:54 Unchecked 17 Callout 38 Geoff: Dewatering is not under PLA. If the project does not have a PLA then we should not be specifying PLA requirements. You can still have a pre construction meeting for reasons other than PLA. AndyW 7/12/2021 12:14 Unchecked 18 Re: Callout 38 Noted, text will be updated to clarify the intent and eliminate the PLA references M Wilson 7/23/2021 6:21 Unchecked 20 Cloud+ 56 this needs updated with new technology for digital record transfer Amit Mutsuddy 7/12/2021 10:21 Unchecked 21 Re: Cloud+ 56 Understood, the use of flash drives or equivalent should provide the necessary ability to transfer files M Wilson 7/23/2021 6:22 Unchecked 23 Callout 132 did initial geotechnical work find PCBs on site and around existing digesters Amit Mutsuddy 7/12/2021 10:54 Unchecked 24 Re: Callout 132 Very minor levels were found. Language retained so that all subcontractors working on the project are alerted to review and understand the coil contaminates that were found M Wilson 7/23/2021 6:24 Unchecked 26 Callout 665 O&M has expressed an interest in having security cameras for incoming and cross traffic as well as license plate recognition. If it's not added now with this project, will O&M have the capacity to add cameras in the future? Michael C 7/15/2021 10:30 Checked 27 Re: Callout 665 The specifics of the cameras, and any other devices at the entrance and within the facility will be shown for the final design M Wilson 7/11/2021 15:53 Unchecked 29 Callout 811 John L. : You may want to clarify that ALL outside coils need to be coated for corrosion. Or add it as a listed point rather than a statement that where indicated as a corrosive environment, they should be coated. Michael C 8/11/2021 15:58 Checked 30 Re: Callout 811 Noted, refer to the equipment schedules on the drawings that call out those units that are to be provided with a protective coating (Herasite, etc.) M Wilson 7/27/2021 6:54 Unchecked 32 Callout 831 Labels should be white over black plastic. Sbarker 7/16/2021 7:50 Checked 33 Re: Callout 831 Will revise as noted. pro51085 7/13/2021 5:28 Unchecked 34 Callout 831 Labels should be white over black plastic Sbarker 7/16/2021 7:50 Checked 35 Re: Callout 831 Will revise as noted. pro51085 7/13/2021 5:30 Unchecked 36 Callout 831 I did not fine a color code at the end of the section. Please make sure the color code matches what is listed in the Automation Guidlines Sbarker 7/7/2021 17:13 Unchecked 37 Re: Callout 831 Refer to Figure 4 26 05 11. Once conductor will be white and one black. pro51085 7/13/2021 5:28 Unchecked 39 Callout 832 Labels should be white over black Sbarker 7/16/2021 7:51 Checked 40 Re: Callout 832 Will revise as noted. pro51085 7/13/2021 5:30 Unchecked 42 Callout 837 This should be removed. Aluminum conduit is not allowed. Sbarker 7/16/2021 7:51 Checked 43 Re: Callout 837 Paragraph about aluminum will be removed. pro51085 7/13/2021 5:31 Unchecked 45 Callout 839 This should be steel Sbarker 7/16/2021 7:51 Checked 46 Re: Callout 839 Revised to steel. pro51085 7/13/2021 5:32 Unchecked 48 Callout 845 Pilot devices should have the same or greater rating as the control station enclosure Sbarker 7/16/2021 7:52 Checked 49 Re: Callout 845 Will add sentence to indicate NEMA rating shall be equal to or greater than the control station enclosure. pro51085 7/13/2021 5:33 Unchecked 51 Callout 848 Signals not indicated on drawings or I/O list for integrator PMurphy 7/28/2021 10:44 Checked 52 Re: Callout 848 I/O will be coordinated with I&C. pro51085 7/13/2021 5:37 Unchecked 53 Callout 848 The UPS should be cord and plug connected to match the rest of the Facility Sbarker 7/16/2021 7:52 Checked 54 Re: Callout 848 Will revise to cord and plug connected. Please provide example of wiring between UPS and panelboard. pro51085 7/13/2021 5:35 Unchecked 58 Callout 858 Wire nuts should be allowed for power circuits using 10AWG stranded wire and smaller. Sbarker 7/16/2021 7:52 Checked 59 Re: Callout 858 Will revise as noted. pro51085 7/13/2021 5:37 Unchecked 61 Callout 861 Use stainless steel clamps and stainless steel framing channel for PVC coated conduit. PVC coated one hole straps and clamp backs are fine for single conduits. Sbarker 7/16/2021 7:52 Checked 62 Re: Callout 861 Will revise framing materials to stainless steel. pro51085 7/13/2021 5:47 Unchecked 63 Callout 861 Please add threadless connectors and couplings are not allowed. Sbarker 7/16/2021 7:52 Checked 64 Re: Callout 861 Will revise as note. pro51085 7/13/2021 5:47 Unchecked 66 Callout 862 Workers installing PVC coated rigid steel conduit should be certified by the manufacturer. Sbarker 7/16/2021 7:52 Checked 67 Re: Callout 862 Will add sentence. pro51085 7/13/2021 5:49 Unchecked 69 Callout 869 The drawings show heat trace equipment Sbarker 7/16/2021 7:52 Checked 70 Re: Callout 869 Added appropriate paragraph. pro51085 7/13/2021 5:52 Unchecked 72 Callout 882 All equipment labels should be white with black letters Sbarker 7/16/2021 7:53 Checked 73 Re: Callout 882 Revised as noted. pro51085 7/13/2021 5:54 Unchecked 76 Callout 887 Not shown on drawings or I/O list for integrator PMurphy 7/28/2021 10:44 Checked 77 Re: Callout 887 I/O will be coordinated with I&C. pro51085 7/13/2021 5:55 Unchecked 78 Callout 887 Nelso P.: "A preliminary check the City's SKM model shows that the faults at: - 4.16KV Transformer (85TFR1) Terminals: - Three Phase: ~22 KA (Sym) - Line-Ground: 1.5 KA (Sym) - 480 V Transformer (85TFR1) Terminals: - Three Phase: 26KA (Sym) - Line-Ground: 27 KA (Sym)The fault current duty listed in the Spec for the Primary Switches and Primary Vacuum AndyW 8/16/2021 10:11 Checked 79 Re: Callout 887 Per Eaton, Partial Current Limiting Fuses can be added in series with the VFI to achieve a 50 kA rating. pro51085 8/5/2021 13:41 Unchecked 81 Callout 889 Nelso P.: "The City recommends replacing the proposed primary protection with either of the following protective relays: - Basler BE1-11T, or -- SEL751 Both of these relays can provide transformer differential protection & Primary Overcurrent Protection. The zone of the differential protection should include transformer primary CT (~600:5) to the 85SWGR1000 MAndyW 8/16/2021 10:13 Checked 83 Re: Callout 889 1. Per Eaton, SEL 787 is a standard product and can be added. They prefer to use the standard SEL relay which has been designed. They can implement a SEL 751 but it would be a custom design. 2. Preliminary discussion with Eaton indicates that we should be able to expand the differential protection zone to include the cables as indicated by Nelso. Factory will reppro51085 8/5/2021 13:47 Unchecked 85 Callout 891 An alarm contact to the DCS showing that the switch is in maintenance mode should be added. Sbarker 7/16/2021 7:53 Checked 86 Re: Callout 891 Contact will be added. pro51085 7/13/2021 6:05 Unchecked 87 Callout 891 Nelso P.: If the Balser or SEL with differential protection is installed, the 85SWGR Main Breaker protection can be used instead of Transformer Secondary Overcurrent Protection. AndyW 8/16/2021 10:14 Checked 88 Re: Callout 891 See response on previous page in regard to paragraph 2-2.08. pro51085 7/13/2021 6:05 Unchecked 89 Callout 891 Nelso P.: "There is no advantage to install the Arc Flash Maintenance Mode Switch at the Transformer If anyone needs to work the Transformer, the Transformer will be shutdown and lockout out. It would be preferred to install the Arc Flash Maintenance Mode Switch at the 85SWGR1000 Main Breakers. If anyone is working on the 85SWGR1000 breakers, the EleAndyW 8/16/2021 10:14 Checked 90 Re: Callout 891 1. Maintenance mode at the transformer is for lowering incident energy at the switchgear for maintenance purposes. 2. Switchgear main will have maintenance mode available. pro51085 7/13/2021 6:04 Unchecked 92 Text Box 895 Nelso P.: Remove the Instantaneous setting. It is not possible to coordinate the Instantaneous settings when the available short-current level of 24 KA (Sym). The Main & Tie beaker protection must have a delay to allow the down stream breaker to clear the fault. Note: The mains and tie breakers to all Switchgears & MCCs should not have instantaneous protectioAndyW 8/16/2021 10:15 Checked 93 Re: Text Box 895 The instantaneous setting can be disabled and should be coordinated after completion of the coordination study. pro51085 7/13/2021 6:08 Unchecked Monday, August 2, 2021
bpetrik, 27
Mnakamoto, 7
pmatkinson, 39
Pmurphy, 120
Amit Mutsuddy, 3
AndyW, 15
Aric, 4
Sbarker, 27
SputhuveeduPalani, 1 Tim Lewis, 6 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 95 Callout 896 Nameplates should be white with black letters. Sbarker 7/16/2021 7:53 Checked 96 Re: Callout 896 Revised as noted. pro51085 7/13/2021 6:11 Unchecked 99 Callout 900 For each main and feeder breaker, provide Electro Industries Shark 200 V-6 power quality monitor to match plant existing equipment. The power should be capable of communicating through Modbus TCP/IP. Sbarker 7/16/2021 7:53 Checked 100 Re: Callout 900 Will revise as noted. pro51085 7/13/2021 6:13 Unchecked 102 Callout 902 Signals not shown on P&IDs or I/O list for integrator PMurphy 7/28/2021 10:44 Checked 103 Re: Callout 902 I/O will be coordinated with I&C. pro51085 7/13/2021 6:14 Unchecked 104 Callout 902 Remove this statement. We want the ability to switch mains without de-energizing the switchgear. Sbarker 7/16/2021 7:53 Checked 105 Re: Callout 902 Revised as noted. pro51085 7/13/2021 6:14 Unchecked 107 Callout 903 Our preferred protective relays are Basler Electric and SEL Sbarker 7/16/2021 7:53 Checked 108 Re: Callout 903 Will revise as noted. pro51085 7/13/2021 6:15 Unchecked 110 Callout 904 We do not use an automatic throwover on any of our switchgears in the RWF. This system is unnecessary and adds unneeded complexity and points of failure to the system. The automatic throwover should be changed to a closed transition that is used on all of the other new switchgears that are being installed in the facility. Please contact Nelso Petroni for a drawinSbarker 7/16/2021 7:54 Checked 111 Re: Callout 904 Per review meeting on 7-13-2021, ATO will be removed and replaced with Hot Swap Control Scheme provided by Nelso. pro51085 7/14/2021 10:58 Unchecked 113 Callout 906 Will there be a FAT witnessed by the City for this equipment? Sbarker 7/16/2021 7:54 Checked 114 Re: Callout 906 Per review meeting on 7-13-2021, City to clarify if any and which equipment should have witnessed FAT. pro51085 7/14/2021 10:58 Unchecked 116 Callout 910 Nameplates should be white with black lettering. Sbarker 7/16/2021 7:54 Checked 118 Re: Callout 910 Revised as noted. pro51085 7/13/2021 6:19 Unchecked 120 Callout 911 A spare overload unit and spare starter of each size should be added. Also 2 of each type of control relay should be included. Sbarker 7/16/2021 7:54 Checked 121 Re: Callout 911 Revised as noted. pro51085 7/13/2021 6:20 Unchecked 123 Callout 914 Any door mounted devices should be mounted to removable terminal blocks to allow the bucket to be removed without de-terminating the device wiring. Sbarker 7/16/2021 7:54 Checked 124 Re: Callout 914 Added requirement as noted. pro51085 7/13/2021 7:26 Unchecked 126 Callout 920 Not shown on P&IDs or I/O list for integrator PMurphy 7/28/2021 10:44 Checked 127 Re: Callout 920 I/O will be coordinated with I&C. pro51085 7/13/2021 7:30 Unchecked 128 Callout 920 For each main and feeder breaker, provide Electro Industries Shark 200 V-6 power quality monitor to match plant existing equipment. The power should be capable of communicating through Modbus TCP/IP. Sbarker 7/16/2021 7:56 Checked 129 Re: Callout 920 Will revise as noted. pro51085 7/13/2021 7:30 Unchecked 131 Callout 925 Nameplates should be white with black letters. Sbarker 7/16/2021 7:56 Checked 132 Re: Callout 925 Revised as noted. pro51085 7/13/2021 7:31 Unchecked 134 Callout 936 Motor protection relay required ? If required add specification for motor protection relay. If not, delete 2-5.03. SPuthuveeduPalani 7/8/2021 21:42 Unchecked 135 Re: Callout 936 Not required. Will indicate "not used" pro51085 7/13/2021 7:32 Unchecked 137 Callout 937 Will a field harmonic distortion test be performed? Sbarker 7/16/2021 7:56 Checked 138 Re: Callout 937 No. Will indicate "not used". pro51085 7/13/2021 7:33 Unchecked 140 Highlight 1064 Correct location of all underground utilities that may impact the HDD installation is the responsibility of the HDD Contractor, regardless of any locations shown on the drawings or previous survey completed by the Engineer. dtikalsky 8/19/2021 8:05 Unchecked 141 Highlight 1064 All existing lines and underground utilities shall be positively identified dtikalsky 8/19/2021 8:06 Unchecked 142 Highlight 1064 It is the HDD Contractor and HDD system operator’s responsibility to determine this envelope of safe offset from existing utilities dtikalsky 8/19/2021 8:06 Unchecked 144 Red Callout: New item to be added 1305 RC: 100% of inner ID MNakamoto 7/20/2021 12:16 Unchecked 145 Re: Red Callout: New item to be added 1305 Full port valves will limit the vendors that are able to bid and increase the cost. If this is acceptable to the city it can be updated. ove51156 7/23/2021 12:53 Unchecked 146 Red Callout: New item to be added 1305 RC: prefer no Grooved end valves. MNakamoto 7/20/2021 12:17 Unchecked 147 Re: Red Callout: New item to be added 1305 Will removed grooved end valves as an options. ove51156 7/23/2021 11:01 Unchecked 148 Cloud+ 1305 RC: Flanged valves are preferred. Prefer to delete grooved and mechanical joint end valves. MNakamoto 7/20/2021 14:02 Unchecked 149 Re: Cloud+ 1305 Mechanical joints would be needed for buried valves. Will confirm we have no buried valves before deleting. ove51156 7/23/2021 11:02 Unchecked 151 Red Callout: New item to be added 1306 RC: Stem Seals, Valve shall have V-Type packing consisting of a Bottom Adapter with a minimum of four V-Packing rings, a Top Adapter and an adjustable gland in a machined packing chamber. The gland is to be easily accessible for adjustment to further extend packing seal life. Packing is to be adjusted without removing the actuator or gear box assembly. MNakamoto 7/20/2021 12:18 Unchecked 152 Re: Red Callout: New item to be added 1306 Comment appears to be language from a submittal or vendor language. Will review the language against the named vendors and adjust accordingly to be within their scope of supply M Wilson 7/27/2021 6:18 Unchecked 153 Red Callout: New item to be added 1306 RC: Bronze bushings are to be used vs ball bearings MNakamoto 7/20/2021 12:19 Unchecked 154 Re: Red Callout: New item to be added 1306 Note sure we understand the comment. Is this comment in the correct location. Section does not discuss bushings or bearings? M Wilson 7/27/2021 6:19 Unchecked 156 Callout 1389 1-1.01? pmatkinson 6/30/2021 15:55 Unchecked 157 Re: Callout 1389 Noted, numbering will be aligned M Wilson 7/26/2021 14:39 Unchecked 158 Callout 1389 s pmatkinson 6/30/2021 15:56 Unchecked 159 Re: Callout 1389 Noted, text to be revised M Wilson 7/27/2021 6:20 Unchecked 160 Callout 1389 part of a vendor pmatkinson 6/30/2021 15:57 Unchecked 161 Re: Callout 1389 Noted, text to be revised M Wilson 7/27/2021 6:20 Unchecked 163 Re: Line 1389 Will be deleted. BUT22066 7/27/2021 13:27 Unchecked 165 Re: Line 1389 Will be deleted. BUT22066 7/27/2021 13:26 Unchecked 167 Re: Line 1389 Will be deleted. BUT22066 7/27/2021 13:27 Unchecked 168 Callout 1389 via pmatkinson 6/30/2021 15:57 Unchecked 169 Re: Callout 1389 Noted, language will be corrected M Wilson 7/27/2021 6:50 Unchecked 170 Callout 1389 The pmatkinson 6/30/2021 16:00 Unchecked 171 Re: Callout 1389 Noted, language will be corrected M Wilson 7/27/2021 6:51 Unchecked 172 Callout 1389 area ? pmatkinson 6/30/2021 15:58 Unchecked 173 Re: Callout 1389 Correct, area numbers BUT22066 7/27/2021 13:28 Unchecked 175 Callout 1389 within the pmatkinson 6/30/2021 15:59 Unchecked 176 Re: Callout 1389 Noted, will be corrected M Wilson 7/26/2021 14:39 Unchecked 178 Re: Line 1389 Will be deleted. BUT22066 7/27/2021 13:26 Unchecked 179 Callout 1389 a pmatkinson 6/30/2021 15:59 Unchecked 180 Re: Callout 1389 Noted, spelling will be corrected M Wilson 7/26/2021 14:35 Unchecked 181 Callout 1389 is pmatkinson 6/30/2021 16:00 Unchecked 182 Re: Callout 1389 Noted grammer will be corrected M Wilson 7/26/2021 14:36 Unchecked 184 Callout 1391 Suggest that wording be added to cover experience of systems similar to those specified pmatkinson 6/30/2021 16:04 Unchecked 185 Re: Callout 1391 Wording will be added to require experience with similar systems specified. BUT22066 7/27/2021 13:29 Unchecked 187 Callout 1402 Graphics should be developed in line with the current Automation guidelines. pmatkinson 6/30/2021 16:11 Unchecked 188 Re: Callout 1402 All graphics will be developed in line with the AGs. BUT22066 7/27/2021 13:29 Unchecked 190 Callout 1403 Suggest this is re-worded. 200 screens may adequately cover everything? pmatkinson 6/30/2021 16:13 Unchecked 191 Re: Callout 1403 Suggestion will be added. BUT22066 7/27/2021 13:30 Unchecked 192 Callout 1403 Should be generated with the Automation guidelines as a basis pmatkinson 6/30/2021 16:14 Unchecked 193 Re: Callout 1403 AGs will be noted as the basis. BUT22066 7/27/2021 13:31 Unchecked 195 Callout 1406 Rephrase, seems like some words are missing PMurphy 7/28/2021 10:45 Checked 196 Re: Callout 1406 Noted, wording will be checked and corrected M Wilson 7/27/2021 6:23 Unchecked 197 Callout 1406 30 working days notification. Conform FAT requirements with City standards PMurphy 7/28/2021 10:45 Checked 198 Re: Callout 1406 Will be revised to conform with City standards. BUT22066 7/27/2021 13:32 Unchecked 200 Callout 1407 specifically the RWF, the CITY have multiple facilities pmatkinson 6/30/2021 16:16 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 201 Re: Callout 1407 RWF will be specified. BUT22066 7/27/2021 13:36 Unchecked 203 Callout 1415 Are all pressure instruments intended to be PSIA, or is PSI meant to indicate gauge (non-absolute) pressure? PMurphy 7/28/2021 10:45 Checked 204 Re: Callout 1415 Gauge pressure. Will correct to show as psig M Wilson 7/27/2021 6:24 Unchecked 206 Callout 1416 Why is this pressure so high? These pumps are around 59ft of head. PMurphy 7/28/2021 10:45 Checked 207 Re: Callout 1416 Will review the limits and adjust the upper limit M Wilson 7/27/2021 6:25 Unchecked 209 Callout 1417 Listed as both 120VAC and DC loop powered, typical throughout schedule PMurphy 6/29/2021 9:26 Unchecked 210 Re: Callout 1417 120 VAC and DC loop powered will both be listed. BUT22066 7/27/2021 13:37 Unchecked 211 Re: Re: Callout 1417 It needs to be one or the other, as currently listed this instrument has two types of power feeds PMurphy 7/28/2021 10:47 Unchecked 213 Callout 1418 Why is this pressure so high? PMurphy 7/28/2021 10:47 Checked 214 Re: Callout 1418 Will review and adjust the high limits of the device M Wilson 7/27/2021 6:26 Unchecked 215 Callout 1418 Not found on drawings PMurphy 7/28/2021 10:47 Checked 216 Re: Callout 1418 Flow meter will be deleted. BUT22066 7/27/2021 13:38 Unchecked 218 Callout 1419 Will this need to be 2" to maintain velocity above 2ft/s per City standards? PMurphy 7/28/2021 10:48 Checked 219 Re: Callout 1419 Will be revised to show 2" flow meter for 2 ft/s min. velocity requirement. BUT22066 7/27/2021 13:39 Unchecked 221 Callout 1421 Why is this pressure so high? PMurphy 7/28/2021 10:48 Checked 222 Re: Callout 1421 will review and adjust the high range of the device M Wilson 7/27/2021 6:27 Unchecked 224 Callout 1424 specify video ports for the monitors, DisplayPort? HDMI? PMurphy 7/28/2021 10:48 Checked 225 Re: Callout 1424 The City's AGs will be followed. BUT22066 7/27/2021 13:44 Unchecked 226 Callout 1424 2 RJ-45 port connections are shown on the network drawings. Are these supposed to be redundant (dual NICs)? PMurphy 7/28/2021 10:48 Checked 227 Re: Callout 1424 Will be revised to reflect 2 RJ-45 ports. BUT22066 7/27/2021 13:41 Unchecked 228 Callout 1424 Recommend some reference to sole-source justification PMurphy 7/28/2021 10:48 Checked 229 Re: Callout 1424 Computers will not be sole-sourced. BUT22066 7/27/2021 13:41 Unchecked 230 Callout 1424 Specify operating system. Will these require LTSC or SAC to limit updates? PMurphy 7/28/2021 10:48 Checked 231 Re: Callout 1424 City's AGs will be followed. BUT22066 7/27/2021 13:44 Unchecked 233 Callout 1425 specify video ports for the monitors, DisplayPort? HDMI? PMurphy 7/28/2021 10:48 Checked 234 Re: Callout 1425 City's AGs will be followed. BUT22066 7/27/2021 13:47 Unchecked 235 Callout 1425 2 RJ-45 port connections are shown on the network drawings. Are these supposed to be redundant (dual NICs)? PMurphy 7/28/2021 10:49 Checked 236 Re: Callout 1425 dual NICs will be specified BUT22066 7/27/2021 13:47 Unchecked 237 Callout 1425 Specify operating system. Will these require LTSC or SAC to limit updates? PMurphy 7/28/2021 10:49 Checked 238 Re: Callout 1425 City's AG will be followed. BUT22066 7/27/2021 13:45 Unchecked 239 Callout 1425 Per automation standards, Dynics and Contec are also acceptable PMurphy 7/28/2021 10:49 Checked 240 Re: Callout 1425 Dynics and Contec will be added. BUT22066 7/27/2021 13:45 Unchecked 241 Callout 1425 Does not appear to meet RAM requirements and noted as end-of-life by MFG. Review models and ensure they are up-to-date. PMurphy 7/28/2021 10:49 Checked 242 Re: Callout 1425 Models will be reviewed and updated. BUT22066 7/27/2021 13:46 Unchecked 244 Callout 1428 Note that the Automation guidelines defines tagging pmatkinson 6/30/2021 16:21 Unchecked 245 Re: Callout 1428 Noted, the automation guidelines are to be included in the documents to ensure all aspects are met M Wilson 7/27/2021 6:21 Unchecked 247 Callout 1451 Will a specific model be required? PMurphy 7/28/2021 10:49 Checked 248 Re: Callout 1451 The City's AGs will be reviewed for a specific model number. BUT22066 7/27/2021 13:49 Unchecked 250 Callout 1451 R6 of the Automation Guidelines calls for the following. Managed Switches: (800xA Networks) -- Hirschmann Greyhound 1042 : -- Base Unit: GRS1042-6T6ZSHH02Y9HHSE2A99XX.X -- Plugin Module: GMM40-OOOOOOOOSY9HHS999.9 -- Plugin Module: GMM40-OOOOTTTTSZ9HHS999.9 -- Dual Plugin Power Supply Module: GPS1-KSY9HH -- Hirschmann BRS40 (Software Levpmatkinson 6/30/2021 16:29 Unchecked 251 Re: Callout 1451 section will be updated as identified in the comment. BUT22066 7/27/2021 13:48 Unchecked 254 Callout 1469 24 VDC or 120 VAC not both? pmatkinson 6/30/2021 16:33 Unchecked 255 Re: Callout 1469 The AGs allow both. Does the City have a preference? BUT22066 7/27/2021 13:50 Unchecked 257 Callout 1492 CompactLogix not included in standards, confirm this is acceptable to City PMurphy 7/28/2021 10:49 Checked 258 Re: Callout 1492 CompactLogix will be deleted. BUT22066 7/27/2021 13:51 Unchecked 260 Callout 1493 Include redundancy requirement per City standards PMurphy 7/28/2021 10:49 Checked 261 Re: Callout 1493 Redundancy will be required. An exception was discussed for centrifuges due to the four centrifuges provide the redundancy. BUT22066 7/27/2021 13:52 Unchecked 263 Callout 1499 Not included in City standards, confirm with City that PanelView is acceptable and include specific model PMurphy 7/28/2021 10:50 Checked 264 Re: Callout 1499 PanelView will be deleted. BUT22066 7/27/2021 13:58 Unchecked 265 Callout 1499 "XE" per standards PMurphy 7/28/2021 10:50 Checked 266 Re: Callout 1499 Will be revised to XE BUT22066 7/27/2021 13:53 Unchecked 267 Callout 1499 Excerpt from AG-RWF-008-R6 HMI Hardware The RWF is standardizing on the Weintek© series or Allen Bradley Panelview series for Local Human Machine Interfaces. PLC based control systems shall be furnished with the above local human machine interface with the following minimum specification:  Touch panpmatkinson 6/30/2021 16:39 Unchecked 268 Re: Callout 1499 Requirements listed will be followed as outlined in the AGs BUT22066 7/27/2021 14:00 Unchecked 269 Text Box 1499 MT8150XE BUT22066 7/27/2021 14:00 Unchecked 271 Callout 1505 City preference is that VLANs not be used where possible PMurphy 7/28/2021 10:50 Checked 272 Re: Callout 1505 VLANs will be removed. BUT22066 7/27/2021 14:00 Unchecked 273 Callout 1505 Include requirement for Modbus/TCP protocol PMurphy 7/28/2021 10:50 Checked 274 Re: Callout 1505 Modbus/TCP protocol will be added. BUT22066 7/27/2021 14:01 Unchecked 275 Callout 1505 Excerpt from AG-RWF-008 - R6 Standard Ethernet Switches Each Main PLC panel will require an Ethernet switch to provide connectivity between the 1756- EN2T Ethernet modules in the redundant PLC chassis and the local HMI. Ethernet Network switches shall be DIN rail mounted, 0 to 60 degrees C, Class I Division 2 rated, minimum of two SFP ports. The switches shall be abpmatkinson 6/30/2021 16:42 Unchecked 276 Re: Callout 1505 Requirements identified will be added. BUT22066 7/27/2021 14:01 Unchecked 278 Callout 1511 Include network-based color requirements from City standards PMurphy 7/28/2021 10:50 Checked 279 Re: Callout 1511 AG network-based color requirements will be added. BUT22066 7/27/2021 14:03 Unchecked 281 Callout 1515 City standard is duplex LC PMurphy 7/28/2021 10:50 Checked 282 Re: Callout 1515 Will be revised to duplex LC BUT22066 7/27/2021 14:03 Unchecked 283 Callout 1515 City standard is duplex LC PMurphy 7/28/2021 10:50 Checked 284 Re: Callout 1515 Will be revised to duplex LC BUT22066 7/27/2021 14:03 Unchecked 286 Callout 1516 Consider including test equipment for Profibus DP as well, something like Procentec Profitrace PMurphy 7/28/2021 10:50 Checked 287 Re: Callout 1516 Profibus DP test equipment will be included. BUT22066 7/27/2021 14:04 Unchecked 289 Callout 1527 City standard is LC PMurphy 7/28/2021 10:50 Checked 290 Re: Callout 1527 Will be revised to duplex LC BUT22066 7/27/2021 14:05 Unchecked 292 Callout 1534 OS for workstations? PMurphy 7/28/2021 10:51 Checked 293 Re: Callout 1534 MS Server is for servers. Windows is for HMIs BUT22066 7/27/2021 14:08 Unchecked 295 Callout 1544 DCS pmatkinson 6/30/2021 16:45 Unchecked 296 Re: Callout 1544 Noted, typo will be corrected M Wilson 7/27/2021 6:21 Unchecked 298 Callout 1549 unclear, are there two auto modes? This indicates pumping batches of volume while level-based control is described below. PMurphy 8/13/2021 9:36 Checked 299 Re: Callout 1549 Text will be revised to reflect volume. BUT22066 7/28/2021 10:11 Unchecked 300 Callout 1549 Can swing-standby be selected for dedicated duty? PMurphy 8/13/2021 9:37 Checked 301 Re: Callout 1549 Yes, the swing/standby can be selected for one train or the other BUT22066 7/28/2021 10:10 Unchecked 302 Callout 1549 Hardwired interlock for seal water failure? PMurphy 8/13/2021 9:37 Checked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 303 Re: Callout 1549 Seal water is hardwired BUT22066 7/28/2021 10:12 Unchecked 304 Callout 1549 software interlocks will not be valid in local mode, only hardwired. pmatkinson 7/6/2021 12:35 Unchecked 305 Re: Callout 1549 Text will be revised to address software interlocks not active in local mode. BUT22066 7/28/2021 10:11 Unchecked 307 Callout 1550 per City standards, power monitoring will include phase current, phase voltage, kW, and KVAR or PF. Typical for all PMurphy 8/13/2021 9:37 Checked 308 Re: Callout 1550 Power monitoring will be updated for all motors. BUT22066 7/28/2021 10:46 Unchecked 309 Callout 1550 High temp signals not shown on P&IDs PMurphy 8/13/2021 9:37 Checked 310 Re: Callout 1550 Will be coordinated with the Mechanical Eng. and revised. BUT22066 8/2/2021 9:02 Unchecked 311 Callout 1550 Valves are manual with indication only on the P&IDs PMurphy 8/13/2021 9:38 Checked 312 Re: Callout 1550 Local/Remote will be deleted BUT22066 7/28/2021 10:45 Unchecked 313 Callout 1550 Lead/lag functionality not described above, duty/standby only. PMurphy 8/13/2021 9:38 Checked 314 Re: Callout 1550 Will reword as duty/standby BUT22066 7/28/2021 10:31 Unchecked 315 Callout 1550 Pumps are fixed speed? pmatkinson 7/6/2021 12:43 Unchecked 316 Re: Callout 1550 This will be changed to reflect volume. BUT22066 8/2/2021 9:03 Unchecked 317 Callout 1550 Jonathan T: "HMI Shall indicate the following alarms as a minumum : 'Pump Suction Valve Fault' ". The signal is not shown on the P&ID. And should rest of the pump follow the same alarm philosophy AndyW 8/16/2021 15:31 Checked 318 Re: Callout 1550 Pump suction valve fault will be added to alarms for all pumps BUT22066 7/28/2021 10:45 Unchecked 320 Callout 1553 Can swing-standby be selected to run in AUTO for either tank? PMurphy 8/13/2021 9:38 Checked 321 Re: Callout 1553 Yes BUT22066 8/2/2021 9:03 Unchecked 323 Callout 1554 No lead/lag described above PMurphy 8/13/2021 9:38 Checked 324 Re: Callout 1554 Lead/Lag will be added above BUT22066 8/2/2021 9:03 Unchecked 325 Callout 1554 not in local correct? pmatkinson 7/6/2021 12:50 Unchecked 326 Re: Callout 1554 Correct, not in local BUT22066 8/2/2021 9:04 Unchecked 328 Callout 1554 Tank Level and Pressure indications pmatkinson 7/6/2021 12:51 Unchecked 329 Re: Callout 1554 Tank level and pressure will be added as appropriate. BUT22066 8/2/2021 9:04 Unchecked 331 Callout 1555 Sharik C: Control Strategy does not indicate how pumps will switch output between storage tanks, an automated sequence should be programmed AndyW 8/16/2021 15:31 Checked 332 Re: Callout 1555 Valves are manually aligned to determine which tank is selected. BUT22066 8/2/2021 9:20 Unchecked 334 Callout 1556 2 transmitters, is one programmed as primary, or will theses be 1-out-of-2 redundant? PMurphy 8/13/2021 9:39 Checked 335 Re: Callout 1556 1-out-of-2 redundant BUT22066 8/2/2021 9:21 Unchecked 336 Callout 1556 For a sustained adjustable period ? pmatkinson 7/6/2021 12:55 Unchecked 337 Re: Callout 1556 Correct. Clarification will be added. BUT22066 8/2/2021 9:21 Unchecked 338 Callout 1556 Pump failure and its effect on the lead/lag arrangement is not discussed. How does the system respond if the lead or lag pump fail. pmatkinson 7/6/2021 13:00 Unchecked 339 Re: Callout 1556 Lead failure will be added to describe standby taking over as the lead pump. BUT22066 8/2/2021 9:22 Unchecked 341 Callout 1557 For a sustained but adjustable time? pmatkinson 7/6/2021 12:55 Unchecked 342 Re: Callout 1557 Correct, this text will be added. BUT22066 8/2/2021 9:22 Unchecked 345 Callout 1559 Installation detail shows solenoid with a manual override? pmatkinson 7/6/2021 13:08 Unchecked 346 Re: Callout 1559 Manual override will be added. BUT22066 8/2/2021 9:22 Unchecked 349 Callout 1565 Can you ever run the feed pump at a fixed speed in manual? pmatkinson 7/6/2021 13:16 Unchecked 350 Re: Callout 1565 Yes, the pumps can be run at a constant speed in manual. BUT22066 8/2/2021 9:24 Unchecked 352 Callout 1566 Not shown on P&IDs or control schematic PMurphy 8/13/2021 9:39 Checked 353 Re: Callout 1566 This will be coordinated with the Mechanical Eng. and revised accordingly. BUT22066 8/2/2021 9:24 Unchecked 354 Callout 1566 Why not hardwired switches as used elsewhere in the facility? PMurphy 8/13/2021 9:39 Checked 355 Re: Callout 1566 This is hardwired. Will revised text to reflect hardwired. BUT22066 8/2/2021 9:42 Unchecked 356 Callout 1566 High pressure shown in SCADA on P&IDs PMurphy 8/13/2021 9:39 Checked 357 Re: Callout 1566 Correct, high pressure is separate. This text will be revised. BUT22066 8/2/2021 9:43 Unchecked 358 Callout 1566 Not shown on P&IDs, is this from the PIT? PMurphy 8/13/2021 9:39 Checked 359 Re: Callout 1566 I will coordinate with the Mechanical Eng. and revise accordingly. BUT22066 8/2/2021 10:27 Unchecked 360 Callout 1566 Add open disconnect interlock to protect VFD PMurphy 8/13/2021 9:39 Checked 361 Re: Callout 1566 Disconnects will be added. BUT22066 8/2/2021 10:28 Unchecked 362 Callout 1566 Do we have communications watchdog alarms between PLC and DCU? pmatkinson 7/6/2021 13:17 Unchecked 363 Re: Callout 1566 Yes, this will be added. BUT22066 8/2/2021 10:34 Unchecked 365 Callout 1567 Not applicable, pumps are dedicated to centrifuges PMurphy 8/13/2021 9:40 Checked 366 Re: Callout 1567 This item will be deleted BUT22066 7/28/2021 11:06 Unchecked 368 Callout 1568 Signals are specifically ready for sludge, not a common ready signal PMurphy 8/13/2021 9:40 Checked 369 Re: Callout 1568 Will be revised for ready for sludge BUT22066 7/28/2021 11:06 Unchecked 371 Callout 1570 Conflicts with Local Manual Section above PMurphy 8/13/2021 9:40 Checked 372 Re: Callout 1570 Will be revised. BUT22066 8/2/2021 8:35 Unchecked 373 Callout 1570 Start? PMurphy 8/13/2021 9:40 Checked
374 Re: Callout 1570 Will be revised to Start. BUT22066 8/2/2021 8:36 Unchecked 375 Callout 1570 Start/Stop? PMurphy 8/13/2021 9:40 Checked 376 Re: Callout 1570 Will be revised to start/stop. BUT22066 8/2/2021 8:36 Unchecked 377 Callout 1570 Individual control of drives requires the HMI be put in maintenance mode. Does the VFD LOR only work in maintenance mode? PMurphy 6/29/2021 14:13 Unchecked 378 Callout 1570 the scroll or bowl drive or a conveyor? pmatkinson 7/6/2021 13:23 Unchecked 379 Re: Callout 1570 yes this is a typo, bowl and scroll. M Wilson 8/2/2021 13:10 Unchecked 381 Callout 1570 local manual control? pmatkinson 7/6/2021 13:24 Unchecked 382 Re: Callout 1570 Correct, local manual BUT22066 8/2/2021 8:55 Unchecked 383 Callout 1570 This is still remote manual through the DCU, just from the COP. pmatkinson 7/6/2021 13:26 Unchecked 384 Re: Callout 1570 This will be revised to reflect remote manual. BUT22066 8/2/2021 10:46 Unchecked 385 Callout 1570 The feed and polymer are always controlled by the DCS correct? The I/O lands on the DCS not the COP. pmatkinson 7/6/2021 13:28 Unchecked 386 Re: Callout 1570 The centrifuge PLC provides the signal to the DCS BUT22066 8/2/2021 8:39 Unchecked 387 Callout 1570 but are provided by the respective COP pmatkinson 7/6/2021 13:38 Unchecked 388 Re: Callout 1570 Correct. This will be clearly spelled out. BUT22066 8/2/2021 11:08 Unchecked 391 Callout 1571 Shown as ethernet only on P&IDs PMurphy 8/13/2021 9:40 Checked 392 Re: Callout 1571 Will be revised to Ethernet. BUT22066 8/2/2021 8:22 Unchecked 393 Callout 1571 Shown as ethernet only on P&IDs PMurphy 8/13/2021 9:40 Checked 394 Re: Callout 1571 Will be revised to Ethernet. BUT22066 8/2/2021 8:22 Unchecked 395 Callout 1571 Power monitoring per P&IDs? PMurphy 8/13/2021 9:40 Checked 396 Re: Callout 1571 Power monitoring will be added. BUT22066 8/2/2021 8:21 Unchecked 397 Callout 1571 Clarify DCU HMI PMurphy 8/13/2021 9:40 Checked 398 Re: Callout 1571 Will change HMI to DCU HMI. BUT22066 8/2/2021 8:33 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 400 Callout 1577 Jonathan T: The two discharge knife gates( 85VLV 10034-01/02) must be manually aligned" what's the reason this cannot be remotely control AndyW 8/16/2021 15:32 Checked 401 Re: Callout 1577 Cost driven design decision. BUT22066 8/2/2021 8:34 Unchecked 403 Callout 1579 Not shown on P&IDs PMurphy 8/13/2021 9:41 Checked 404 Re: Callout 1579 Will be verified with the Mechanical Eng. and revised. BUT22066 8/2/2021 8:34 Unchecked 406 Callout 1580 DCS85PNL10000-01 on P&IDs PMurphy 8/13/2021 9:41 Checked 407 Re: Callout 1580 Data mapping should be between the DCU and the centrifuge PLCs. This will be revised. BUT22066 8/2/2021 8:21 Unchecked 408 Callout 1580 DCS85PNL10000-02 on P&IDs PMurphy 8/13/2021 9:41 Checked 409 Re: Callout 1580 Data mapping should be between the DCU and the centrifuge PLCs. This will be revised. BUT22066 8/2/2021 8:20 Unchecked 411 Callout 1581 Jonathan T: Thedischarge knife gates after the second distribution conveyor (85CNV10062/72) must be manually aligned" what's the reason this cannot be remotely control and be part of the start-up automation sequence AndyW 8/16/2021 15:32 Checked 412 Re: Callout 1581 These gates are providing an extra layer of redundancy to the system and automating them is not necessary. Each conveyor train is redundant to the other, and these gates were added to provide an increased level of redundancy based on the physical arrangement M Wilson 7/27/2021 6:31 Unchecked 414 Callout 1586 Does limit apply to any one of four LITs? PMurphy 8/13/2021 9:41 Checked 415 Re: Callout 1586 Yes, it applies to any of the four LITs. BUT22066 8/2/2021 8:18 Unchecked 416 Callout 1586 Why not include position contacts for feedback? PMurphy 8/13/2021 9:42 Checked 417 Re: Callout 1586 This was a design decision to reduce cost. BUT22066 8/2/2021 11:10 Unchecked 419 Callout 1592 Nora - Regarding "close when a truck weight setpoint is reached," what is the minimum detectable weight of each scale and the speed at which it detects the weight? I am wondering if setpoints should be set well below weight limits to account for a lack of sensitivity/accuracy and lagging/delayed readings by the scales. This information isn't noted in specification secAric 8/17/2021 11:48 Checked 420 Re: Callout 1592 The accuracy of the scales is approximately 20 lbs. the set points will be adjustable and the plant staff will have the ability to fine tune the loading once the system is operational M Wilson 7/23/2021 6:33 Unchecked 422 Callout 1596 Not in local pmatkinson 7/6/2021 13:53 Unchecked 423 Re: Callout 1596 Agreed. This will be revised. BUT22066 8/2/2021 11:15 Unchecked 425 Callout 1597 Only one temperature switch shown on the P&IDs PMurphy 8/13/2021 9:42 Checked 426 Re: Callout 1597 This will be coordinated with the Mechanical Eng. and revised accordingly. BUT22066 8/2/2021 11:15 Unchecked 428 Callout 1598 LOR not shown on P&IDs, remote control capability not available PMurphy 8/13/2021 9:42 Checked 429 Re: Callout 1598 This will be revised to Test-Off-Auto. BUT22066 8/2/2021 11:18 Unchecked 430 Callout 1598 Control shown as local auto on P&IDs PMurphy 8/13/2021 9:42 Checked 431 Re: Callout 1598 The description will be revised for local auto. BUT22066 8/2/2021 11:18 Unchecked 433 Callout 1599 Reset shown at a local control panel PMurphy 8/13/2021 9:43 Checked 434 Re: Callout 1599 This will be revised to the LCP. BUT22066 8/2/2021 11:19 Unchecked 435 Callout 1599 Not possible, no DCU outputs for control per P&IDs PMurphy 8/13/2021 9:43 Checked 436 Re: Callout 1599 Remote Auto will be changed to Not used. BUT22066 8/2/2021 11:19 Unchecked 437 Callout 1599 Not possible, no DCU outputs for control per P&IDs PMurphy 8/13/2021 9:43 Checked 438 Re: Callout 1599 Remote Manual will be changed to Not used. BUT22066 8/2/2021 11:19 Unchecked 439 Callout 1599 No float for this on drawings PMurphy 8/13/2021 9:43 Checked 440 Re: Callout 1599 LWCO will be deleted. BUT22066 8/2/2021 11:20 Unchecked 442 Callout 1600 No flow meter shown on P&IDs PMurphy 8/13/2021 9:43 Checked 443 Re: Callout 1600 Flow will be deleted. BUT22066 8/2/2021 11:21 Unchecked 444 Callout 1600 These are floats and cannot be set at the HMI PMurphy 8/13/2021 9:43 Checked 445 Re: Callout 1600 These set points will be deleted. BUT22066 8/2/2021 11:21 Unchecked 446 Callout 1600 No flow meter shown on P&IDs PMurphy 8/13/2021 9:43 Checked 447 Re: Callout 1600 Flow will be deleted. BUT22066 8/2/2021 11:21 Unchecked 448 Callout 1600 not available PMurphy 8/13/2021 9:43 Checked 449 Re: Callout 1600 This will be revised reflect local auto. BUT22066 8/2/2021 11:22 Unchecked 451 Callout 1604 Not adjustable in SCADA PMurphy 8/13/2021 9:43 Checked 452 Re: Callout 1604 This will be deleted. BUT22066 8/2/2021 11:25 Unchecked 453 Callout 1604 Only one temperature switch shown PMurphy 8/13/2021 9:43 Checked 454 Re: Callout 1604 This will be coordinated with the Mechanical Eng. and revised accordingly. BUT22066 8/2/2021 11:26 Unchecked 456 Callout 1606 Start/stop PMurphy 8/13/2021 9:43 Checked 457 Re: Callout 1606 Will be changed to start/stop BUT22066 8/2/2021 11:25 Unchecked 458 Callout 1606 Are there any manual controls for the booster pump? How does it start/stop? PMurphy 8/13/2021 9:44 Checked 459 Re: Callout 1606 Yes, the LCP has start/stop control. BUT22066 8/2/2021 11:30 Unchecked 460 Callout 1606 No description of the dilution valves, are they manual only? PMurphy 8/13/2021 9:44 Checked 461 Re: Callout 1606 Dilution valves control description will be added. BUT22066 8/2/2021 11:31 Unchecked 464 Re: Line 1608 statuses will be changed to status. BUT22066 8/2/2021 11:31 Unchecked 465 Callout 1608 Jonathan T: Diluation Panal Valve Fault Alarm missing on P&ID. AndyW 8/16/2021 15:32 Checked 466 Re: Callout 1608 Fault alarm will be added. BUT22066 8/2/2021 11:32 Unchecked 468 Callout 1609 Assumed units for inputs not stated, unclear where ton conversion is needed (DensityS?) PMurphy 8/13/2021 9:45 Checked 469 Re: Callout 1609 This will be coordinated with the Mechanical Eng. and revised. BUT22066 8/2/2021 11:34 Unchecked 470 Re: Callout 1609 tons is the typical value to be used for dosages for polymer feed to centrifuges M Wilson 8/2/2021 11:34 Unchecked 471 Callout 1609 is the time basis hours (given the conversion in the FR calc)? PMurphy 8/13/2021 9:48 Checked 472 Re: Callout 1609 This will be coordinated with the Mechanical Eng. and revised. BUT22066 8/2/2021 11:35 Unchecked 473 Callout 1609 Control strategy describes permissives, manual start/stop, and flow pace signals being passed from the centrifuge PLCs PMurphy 8/13/2021 9:48 Checked 474 Re: Callout 1609 Permissives, start/stop and flow pacing will be added to data mapping. BUT22066 8/2/2021 11:38 Unchecked 476 Callout 1610 This is located on a field hand station, not RVSS PMurphy 8/13/2021 9:48 Checked 477 Re: Callout 1610 Will be revised to LCS. BUT22066 8/2/2021 11:41 Unchecked 478 Callout 1610 LCS, typ PMurphy 8/13/2021 9:48 Checked 479 Re: Callout 1610 Will be revised to LCS. BUT22066 8/2/2021 11:41 Unchecked 480 Callout 1610 If used for area declassification, do signals from these fans need to be tied into a visual go/no-go system to indicate if they are not providing the required air changes for an area due to a fault? PMurphy 8/13/2021 9:49 Checked 481 Re: Callout 1610 This is not used to declassify the areas. BUT22066 8/2/2021 11:41 Unchecked 482 Callout 1610 What is the difference between remote manual and remote auto? Should the manual functionality described even exist given the auto mode described below? PMurphy 8/13/2021 9:49 Checked 483 Re: Callout 1610 Remote Manual and Auto will be removed. BUT22066 8/2/2021 11:50 Unchecked 485 Callout 1611 Conflicts with above statement that the duty fan needs to be running at all times. If DCU power cycles shouldn't this restart automatically? PMurphy 8/13/2021 9:49 Checked 486 Re: Callout 1611 This will be removed. BUT22066 8/2/2021 11:52 Unchecked 487 Callout 1611 Hardwired to starter per P&IDs? PMurphy 8/13/2021 9:49 Checked 488 Re: Callout 1611 This will be revised to reflect hardwired. BUT22066 8/2/2021 11:53 Unchecked 490 Callout 1612 Communication with HVAC described above? Go/No-go indication? PMurphy 8/13/2021 9:50 Checked 491 Re: Callout 1612 This is hardwired. BUT22066 8/2/2021 11:57 Unchecked 492 Callout 1612 T-O-A on P&IDs PMurphy 8/13/2021 9:50 Checked 493 Re: Callout 1612 This will be revised to T-O-A BUT22066 8/2/2021 11:58 Unchecked 494 Callout 1612 Not shown on P&IDs, "Test" function on TOA instead PMurphy 8/13/2021 9:50 Checked 495 Re: Callout 1612 This will be revised to Test. BUT22066 8/2/2021 11:58 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 497 Callout 1613 T-O-A on P&IDs PMurphy 8/13/2021 9:50 Checked 498 Re: Callout 1613 This will be revised to T-O-A. BUT22066 8/2/2021 11:58 Unchecked 499 Callout 1613 Is there a delay on this if it the same as the "all pumps stop" float? PMurphy 8/13/2021 9:50 Checked 500 Re: Callout 1613 Low-Low alarm will be deleted. BUT22066 8/2/2021 12:15 Unchecked 501 Callout 1613 Is this separate from low-low level? PMurphy 8/13/2021 9:50 Checked 502 Re: Callout 1613 No, this is low-low level BUT22066 8/2/2021 12:15 Unchecked 503 Callout 1613 If this is the "all pumps stop" float, it should not interlock and need reset. Really no reason for it to require a reset since the float would self-reset. PMurphy 8/13/2021 9:50 Checked 504 Re: Callout 1613 This will be revised to removed the interlock/reset requirement. BUT22066 8/2/2021 12:16 Unchecked 505 Callout 1613 Not shown on drawings PMurphy 8/13/2021 9:50 Checked 506 Re: Callout 1613 This will be coordinated with the Mechanical Eng. and revised accordingly. BUT22066 8/2/2021 12:07 Unchecked 507 Callout 1613 Not shown on drawings PMurphy 8/13/2021 9:50 Checked 508 Re: Callout 1613 This will be coordinated with the Mechanical Eng. and revised accordingly. BUT22066 8/2/2021 12:07 Unchecked 509 Callout 1613 Not shown on drawings PMurphy 8/13/2021 9:50 Checked 510 Re: Callout 1613 This will be coordinated with the Mechanical Eng. and revised accordingly. BUT22066 8/2/2021 12:07 Unchecked 511 Callout 1613 Jonathan T: Tank Low-Low Level Alarm missing on P&ID AndyW 8/16/2021 15:33 Checked 512 Re: Callout 1613 This will be deleted from the alarms. BUT22066 8/2/2021 12:16 Unchecked 514 Callout 1614 Refer to comments on process drain lift station above PMurphy 8/13/2021 9:51 Checked 515 Re: Callout 1614 Noted, those comments will be incorporated for the sanitary sewer lift station. BUT22066 8/2/2021 12:17 Unchecked 517 Callout 1615 Jonathan T: Tank Low-Low Level Alarm missing on P&ID AndyW 8/16/2021 15:33 Checked 518 Re: Callout 1615 Low-low alarm will be deleted. BUT22066 8/2/2021 12:17 Unchecked 520 Callout 1617 No control description for WTR1 booster pump system PMurphy 8/13/2021 9:51 Checked 521 Re: Callout 1617 Correct, the WTR1 Air Gap and Booster Pump Station will be controlled by a control system provided as a part of the packaged system and therefore not through the DCS M Wilson 7/8/2021 15:52 Unchecked 522 Re: Re: Callout 1617 Is information needed for integration of the vendor package to communicate with the DCS and provide monitoring points in SCADA? Not an in-depth description, but just some guidance for the programmer as to what is expected or any points that need to be passed between the systems. PMurphy 7/28/2021 10:54 Unchecked 523 Callout 1617 This signals are not shown PMurphy 8/13/2021 9:51 Checked 524 Re: Callout 1617 This will be coordinated with the Mechanical Eng. and revised accordingly. BUT22066 8/2/2021 12:17 Unchecked 525 Callout 1617 Jonathan T: Missing Air Receiver Low-Low Pressure on P&ID. AndyW 8/16/2021 15:33 Checked 526 Re: Callout 1617 This will be reworded to match the P&ID. BUT22066 8/2/2021 12:19 Unchecked 527 Callout 1617 Jonathan T: Missing Air Receiver High-High Pressure on P&ID. AndyW 8/16/2021 15:34 Checked 528 Re: Callout 1617 This will be reworded to match the P&ID. BUT22066 8/2/2021 12:19 Unchecked 530 Callout 1621 Confirm sole-source is approved by City per standards and include justification language PMurphy 7/28/2021 10:54 Checked 531 Re: Callout 1621 Will not be sole-sourced. BUT22066 7/27/2021 14:12 Unchecked 532 Callout 1621 Per City standards preferred MFG is ABB PMurphy 7/28/2021 10:55 Checked 533 Re: Callout 1621 Will be revised to ABB or equal. BUT22066 7/27/2021 14:12 Unchecked 535 Callout 1622 Not used in P&IDs, only switches are used on the eyewashes PMurphy 7/28/2021 10:55 Checked 536 Re: Callout 1622 Will be changed to "Not used." BUT22066 7/27/2021 14:13 Unchecked 537 Callout 1622 Kurz is preferred ( see AG-RWF-0005 R6) pmatkinson 7/6/2021 15:01 Unchecked 538 Re: Callout 1622 Noted, multiple manufacturers listed for competition. If City ok with sole source, preferred mfgr can be used. Will add costs for sole source. M Wilson 7/26/2021 14:33 Unchecked 539 Re: Callout 1622 Noted. But not used. BUT22066 7/27/2021 14:13 Unchecked 541 Callout 1627 Confirm sole-source is approved by City per standards and include justification language PMurphy 7/28/2021 10:56 Checked 542 Re: Callout 1627 Will not be sole-sourced. BUT22066 7/27/2021 14:13 Unchecked 544 Callout 1628 Confirm sole-source is approved by City per standards and include justification language PMurphy 7/28/2021 10:56 Checked 545 Re: Callout 1628 Will not be sole-sourced. BUT22066 7/27/2021 14:13 Unchecked 547 Callout 1629 Confirm sole-source is approved by City per standards and include justification language PMurphy 7/28/2021 10:56 Checked 548 Re: Callout 1629 Will not be sole-sourced. BUT22066 7/27/2021 14:14 Unchecked 549 Callout 1629 NEMA 4X required by standards PMurphy 7/28/2021 10:56 Checked 550 Re: Callout 1629 Will be revised to NEMA 4X BUT22066 7/27/2021 14:14 Unchecked 552 Callout 1630 Confirm sole-source is approved by City per standards and include justification language PMurphy 7/28/2021 10:56 Checked 553 Re: Callout 1630 Will not be sole-sourced. BUT22066 7/27/2021 14:14 Unchecked 554 Callout 1630 Named MFG/model appears to only be available in DC power PMurphy 7/28/2021 10:56 Checked 555 Re: Callout 1630 Will be revised to reflect dc-power BUT22066 7/27/2021 14:14 Unchecked 556 Callout 1630 Confirm sole-source is approved by City per standards and include justification language PMurphy 7/28/2021 10:56 Checked 557 Re: Callout 1630 Will not be sole-sourced. BUT22066 7/27/2021 14:15 Unchecked 558 Callout 1630 Per City standards, NEMA-4X PMurphy 7/28/2021 10:57 Checked 559 Re: Callout 1630 Will be revised to NEMA 4X BUT22066 7/27/2021 14:15 Unchecked 561 Callout 1631 Confirm sole-source is approved by City per standards and include justification language PMurphy 7/28/2021 10:57 Checked 562 Re: Callout 1631 Will not be sole-sourced. BUT22066 7/27/2021 14:15 Unchecked 564 Callout 1632 Per City standards, preference is Endress + Hauser PMurphy 7/28/2021 10:57 Checked 565 Re: Callout 1632 Will be revised to E+H BUT22066 7/27/2021 14:15 Unchecked 566 Callout 1632 No indication of these being used on the drawings or schedule PMurphy 7/28/2021 10:57 Checked 567 Re: Callout 1632 Will be revised to "Not used." BUT22066 7/27/2021 14:16 Unchecked 568 Callout 1632 Ashcroft is preferred ( see AG-RWF-0005 R6) pmatkinson 7/6/2021 15:04 Unchecked 569 Re: Callout 1632 Noted, multiple manufacturers listed for competition. If City ok with sole source, preferred mfgr can be used. Will add costs for sole source. M Wilson 7/26/2021 14:33 Unchecked 570 Re: Callout 1632 Will be revised to Ashcroft or equal. BUT22066 7/27/2021 14:15 Unchecked 572 Callout 1637 Also specified in 40 72 00 PMurphy 7/28/2021 10:58 Checked 573 Re: Callout 1637 Pressure switches and transmitters are specified in 40 72 00. This spec is flow pressure gauges. ove51156 7/23/2021 11:08 Unchecked 574 Re: Callout 1637 Field Pressure Gauges in 40 72 00 will be revised to "Not used." BUT22066 7/27/2021 14:16 Unchecked 576 Callout 1652 Precision Digital is preferred ( see AG-RWF-0005 R6) pmatkinson 7/6/2021 15:06 Unchecked 577 Re: Callout 1652 Noted, multiple manufacturers listed for competition. If City ok with sole source, preferred mfgr can be used. Will add costs for sole source. M Wilson 7/26/2021 14:34 Unchecked 578 Re: Callout 1652 Will be revised to Precision Digital or equal. BUT22066 7/27/2021 14:17 Unchecked 580 Callout 1684 What about speed control? variable speed on hoist and trolley, and 2-speed on bridge specified earlier in spec bpetrik 8/5/2021 9:06 Checked 581 Re: Callout 1684 Yes, bridge, trolley, and hook speeds will be controllable from the remote. Will specify accordingly M Wilson 8/2/2021 11:43 Unchecked 583 Callout 1693 will a flow control/sensing device be provided in the seal panel? bpetrik 7/15/2021 8:48 Unchecked 584 Re: Callout 1693 that is not the specific type of seal water flow that will be used on the project, however there is a flow switch on that particular detail M Wilson 8/2/2021 11:46 Unchecked 586 Callout 1704 what is the max noise levels from these fans? need spec with limits? bpetrik 8/5/2021 9:08 Checked 587 Re: Callout 1704 It is listed in the data sheet at the end of the section, 85dBa M Wilson 8/2/2021 11:48 Unchecked 589 Callout 1722 what is the noise level from the compressors? are acoustical enclosures needed? bpetrik 7/15/2021 8:57 Unchecked 590 Re: Callout 1722 Will verify with the related manufacturers. Typically units are 87-89 dBA. Note that the AC's will not operate continuously, only intermittently and mostly for operation of the truck loadout discharge gates M Wilson 8/2/2021 11:51 Unchecked 592 Callout 1731 The air permit requires an alarm when valve is activated....is this capability provided? bpetrik 8/5/2021 9:10 Checked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 593 Re: Callout 1731 Agree, this was addressed in a recent review meeting. Design will incorporate a means for notifying and alarming when the valves open M Wilson 8/2/2021 11:52 Unchecked 595 Callout 1750 Very high for pumping over 2% solids. Normally less than 1200 rpm to mim wear bpetrik 7/28/2021 10:55 Checked 596 Re: Callout 1750 Would agree for a pump with higher heads for transfer. Should not pose a problem for a pump with low heads as these pumps will see in mixing service M Wilson 7/27/2021 6:15 Unchecked 597 Callout 1750 what is the min. head when the tank is at low level? is this point on the pump char curve opeating range? bpetrik 8/5/2021 9:11 Checked 599 Re: Callout 1750 refer to the comment on the NPSHA. The TDH is with the NPSHA shown M Wilson 7/27/2021 6:14 Unchecked 601 Callout 1750 confirm this number (when sludge surface is at lower levels) bpetrik 8/5/2021 9:15 Checked 602 Re: Callout 1750 the NPSHA is for when the sludge level in the tank is low for the mixing system, approx 6 ft above the centerline of the pumps. No mixing would be needed at these low levels M Wilson 7/27/2021 6:13 Unchecked 604 Cloud+ 1757 Is there a better/superior pump to specify? MNakamoto 6/28/2021 14:52 Unchecked 605 Re: Cloud+ 1757 Wemco is a superior pump for this application. Is there an issue with it? This was confirmed with City O&M staff early in the design phase M Wilson 7/11/2021 15:54 Unchecked 607 Callout 1761 Confirm bpetrik 8/5/2021 9:15 Checked
608 Re: Callout 1761 No, these motor operated valves were deleted late in the 60% design process. Will coordinate M Wilson 7/27/2021 6:33 Unchecked 609 Callout 1761 What about during digester draining opeations? bpetrik 8/5/2021 9:15 Checked 610 Re: Callout 1761 the pumps are specified for their intended operation, which is transfer of sludge fro the digesters to the tanks. As noted in the tech meetings they will have the capability to draw a digester down to below the hatch level when used to drain a digester M Wilson 7/27/2021 6:34 Unchecked 612 Callout 1770 see para 1.5 in this section - duplicate? bpetrik 7/28/2021 10:50 Checked 613 Re: Callout 1770 yes, will delete this section M Wilson 7/27/2021 6:36 Unchecked 615 Callout 1772 should this be "max" conc.? bpetrik 7/28/2021 10:50 Checked 616 Re: Callout 1772 Sure, will add "Max" M Wilson 7/27/2021 6:36 Unchecked 617 Callout 1772 2.5inch? to match what is listed in the mixing pumps from the sludge storage tanks? bpetrik 7/28/2021 10:51 Checked 618 Re: Callout 1772 Agree, will revise M Wilson 7/27/2021 6:40 Unchecked 620 Callout 1773 Very fast for pumping over 2% sludge, confirm bpetrik 8/5/2021 9:39 Checked 621 Re: Callout 1773 This is well within the range for this type of pump. M Wilson 7/27/2021 6:41 Unchecked 622 Callout 1773 Confirm these numbers if sludge holding tanks are operating in the 15 to 30% full range. bpetrik 7/28/2021 10:51 Checked 623 Re: Callout 1773 confirmed. rated head number is at the tank at low levels M Wilson 7/27/2021 6:42 Unchecked 625 Callout 1774 The mixing pumps indicate up to 2.5 inch....Confirm bpetrik 7/28/2021 10:51 Checked 626 Re: Callout 1774 yes, 2.5 is appropriate Will revise language M Wilson 7/27/2021 6:44 Unchecked 629 Callout 1789 Are these the split case type? that allows stator to be removed w/o taking down discharge piping? bpetrik 8/5/2021 9:40 Checked 630 Re: Callout 1789 No. the piping system is designed to allow the rotor and stator to be removed with only the removal of a single 90 degree elbow. M Wilson 7/8/2021 15:56 Unchecked 632 Callout 1793 The P&ID indicates 40 hp. confirm. also what is the high pressure shutdown on discharge (see PSH on P&IDs)? has the motor hp accounted for this? bpetrik 8/5/2021 9:42 Checked 633 Re: Callout 1793 Noted, the HP for the pumps between the locations that it is listed will be coordinated for the final design M Wilson 7/11/2021 15:50 Unchecked 635 Callout 1797 confirm if the motor hp has been sized for this criteria. bpetrik 7/28/2021 10:52 Checked 636 Re: Callout 1797 This is not an operating point, but a shutoff point should the pump accidentally be operated against a closed valve. The motor will have no issue creating these pressures M Wilson 7/11/2021 15:51 Unchecked 638 Callout 1815 Nora - What is the purpose of the proximity reader? Is it intended for RWF operators to use should they need access to the DCS? It's not currently contemplated that truck drivers will be given RWF access cards or badges. Aric 8/17/2021 11:48 Checked 639 Re: Callout 1815 The proximity reader is really nothing more than a sensor that acknowledges that there is someone in front of the unit which wakes it up M Wilson 7/23/2021 7:10 Unchecked 640 Callout 1815 Nora - Who will provide and program the data management software that will receive the printed ticket data? Should it be added to this section's scope? Aric 8/17/2021 11:48 Checked 641 Re: Callout 1815 Refer to paragraph 2-1.03.03 which discusses the software and program to be provided as a part of the scale package. M Wilson 7/23/2021 7:12 Unchecked 642 Text Box 1815 No cameras are shown in the drawings or described in the specifications. At minimum, there should be cameras at the entrance/exit gates and in the loadout bays (looking down into truck containers). Aric 8/17/2021 11:48 Checked 643 Re: Text Box 1815 Cameras will be provided to allow for monitoring of the gates and the loading process area in the Cake Loadout Building. These will be added for the final design M Wilson 7/11/2021 15:47 Unchecked 645 Callout 1841 is mech mixing correct? or hydr mixing for the Velodyne units? bpetrik 8/5/2021 9:43 Checked 646 Re: Callout 1841 will verify the specific language with the vendor and adjust to be specific M Wilson 8/2/2021 12:24 Unchecked 647 Callout 1841 Provide a more detailed description - multi-chamber, materials, etc. bpetrik 8/5/2021 9:43 Checked 648 Re: Callout 1841 Noted, we can enhance the description to be clear M Wilson 8/2/2021 13:14 Unchecked 649 Red Callout: New item to be added 1841 should a 2-stage mixing be called out? MNakamoto 7/19/2021 14:35 Unchecked 650 Re: Red Callout: New item to be added 1841 Velodyne technically uses three stages of mixing and UGSI uses two stages of mixing. One manufacturer utilizes two mechanical mixing steps and the other uses a hydro-dynamic and hydro-mechanical mixing steps. ove51156 7/23/2021 11:31 Unchecked 652 Callout 1842 Why not all SST? bpetrik 7/28/2021 10:54 Checked 653 Re: Callout 1842 PVC is a lower capital cost. PVC is also compatible with polymer. ove51156 7/23/2021 12:04 Unchecked 655 Callout 1853 Previous discussions indicated CFD analysis would be provided - because of the wide variation of tank sludge levels. confirm bpetrik 8/5/2021 9:47 Checked 656 Re: Callout 1853 No CFD analysis is provided. Based on the operation of the tank (as a wide spot in the line and to provide a blended mix to the centrifuges) the need to verify complete mix, like in a digester is not warranted M Wilson 7/27/2021 6:46 Unchecked 658 Callout 1855 Confirm this elevation, see discussion on hydraulic profile, and the range of tank sludge level. Will the mixing system shut down if the tank reaches this level? bpetrik 6/30/2021 14:06 Unchecked 659 Re: Callout 1855 See comment responses on the hydraulic profile on this. The Hyd profile was showing the approximate normal operation of the tank M Wilson 7/27/2021 6:47 Unchecked 661 Callout 1871 or 2.5 inch? that is the size from the pump spec's to be passed bpetrik 7/28/2021 10:54 Checked 662 Re: Callout 1871 1.5 in particle is the maximum coming out of the grinder. ove51156 7/23/2021 12:52 Unchecked 663 Callout 1871 the P&IDs indicate 850 gpm - confirm size. bpetrik 7/28/2021 10:55 Checked 664 Re: Callout 1871 Spec is correct. P&ID will be corrected. ove51156 7/23/2021 11:43 Unchecked 665 Callout 1871 The dwg indicate 6 inch connections. confirm size. bpetrik 7/28/2021 10:55 Checked 666 Re: Callout 1871 6 inch is correct. This table will be corrected. ove51156 7/23/2021 11:44 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 60% Bluebeam Studio Weekly Summary
Digested Sludge Dewatering Facility Project (7758)
Reviewer Comments: 801
BV Responses: 844 105%
Backchecked Responses: 323 40%
ID Subject Page Label Comment Author Date Backchecked
4 Markup Callout C-102-84 IDENTIFY WHICH IS TANK 1 AND WHICH IS TANK 2. MWalkowiak 6/23/2021 15:44 Unchecked 5 Re: Markup Callout C-102-84 Noted, tanks will be identified as No1 and No2. M Wilson 7/20/2021 10:47 Unchecked 7 Markup Callout C-102-84 SEE MARKUP ON PROCESS FLOW DIAGRAM FOR POTENTIAL CONFIGURATION CHANGE THAT ELIMINATES SINGLE POINTS OF FAILURE. MWalkowiak 6/23/2021 15:46 Unchecked 8 Re: Markup Callout C-102-84 Refer to responses on D sheets as the comments are made on the PFD drawings, and the D sheets. Answered on the D sheets to avoid repetition M Wilson 7/22/2021 17:38 Unchecked 10 Red Callout: New item to be added A-001-00 Confirm symbol is up to date DCrawford 8/18/2021 14:07 Checked 11 Re: Red Callout: New item to be added A-001-00 Will coordinate in final design if necessary. Jonathan Keaney 7/25/2021 16:30 Unchecked 12 Cloud+ A-001-00 Recommend coordinating with General symbols on drawing G-004-00 DCrawford 8/18/2021 14:07 Checked 13 Re: Cloud+ A-001-00 Will coordinate in final design if necessary. Jonathan Keaney 7/25/2021 16:59 Unchecked 14 Cloud+ A-001-00 Confirm if Abbreviations should be coordinated with drawing G-003-00 DCrawford 8/18/2021 6:33 Checked 15 Re: Cloud+ A-001-00 Will coordinate in final design if necessary. Jonathan Keaney 7/25/2021 16:26 Unchecked 17 Red Callout: New item to be added A-002-00 Recommend providing energy code table DCrawford 8/18/2021 14:08 Checked 18 Re: Red Callout: New item to be added A-002-00 title 24 drawings included in building mechanical drawings. Jonathan Keaney 7/25/2021 16:31 Unchecked 19 Red Callout: New item to be added A-002-00 Provide applicable Title 24 forms DCrawford 8/18/2021 14:08 Checked 20 Re: Red Callout: New item to be added A-002-00 Provided in building mechanical sheets. Jonathan Keaney 7/25/2021 17:00 Unchecked 21 Red Callout: New item to be added A-002-00 Confirm compliance with Green Building Standards Code DCrawford 8/18/2021 14:08 Checked 23 Re: Red Callout: New item to be added A-002-00 Will confirm and add to the notation M Wilson 8/3/2021 17:23 Unchecked 29 Cloud+ A-003-00 TO ALL Sheets: Can we be consistent in ALL the sheets (including all other disciplines and w/key note plan (key note plan can be reduced to almost half of size shown). Domenic Onorato 7/13/2021 11:22 Unchecked 30 Re: Cloud+ A-003-00 Will coordinate with BIM Team in final design aharm 7/26/2021 17:50 Unchecked 31 Red Callout: New item to be added A-003-00 Modify graphics for rated wall DCrawford 8/18/2021 14:10 Checked 32 Re: Red Callout: New item to be added A-003-00 Non-critical format comment. Jonathan Keaney 7/25/2021 10:54 Unchecked 34 Cloud+ A-004-00 single door should suffice (3'-6" would be best) Domenic Onorato 7/13/2021 11:25 Unchecked 35 Re: Cloud+ A-004-00 Will revise in final design. aharm 7/26/2021 17:51 Unchecked 36 Callout A-004-00 Does office have room for 2 staff and desks if needed? Tim Lewis 7/20/2021 13:23 Unchecked 37 Re: Callout A-004-00 Will coordinate in final design, possibly will have to verify with furniture supplier aharm 7/26/2021 17:51 Unchecked 39 Red Callout: New item to be added A-005-00 Difficult to see path of travel line, recommend alternative graphics (typ all code drawings) DCrawford 7/20/2021 11:59 Unchecked 40 Re: Red Callout: New item to be added A-005-00 Non-critical format comment. Will consider different drawing presentation. Jonathan Keaney 7/25/2021 18:12 Unchecked 41 Red Callout: New item to be added A-005-00 Confirm distance shown is correct DCrawford 7/20/2021 20:16 Unchecked 42 Re: Red Callout: New item to be added A-005-00 Will confirm. Jonathan Keaney 7/25/2021 10:54 Unchecked 44 Cloud+ A-006-00 where is this building on the site? Was this rotated? the North arrow changed from the previous plan. Domenic Onorato 7/13/2021 11:29 Unchecked 45 Re: Cloud+ A-006-00 Can provide site key plan for clarification in final design. aharm 7/26/2021 17:56 Unchecked 47 Red Callout: New item to be added A-007-00 Recommend extending finishes 4" above the ceiling line DCrawford 8/18/2021 14:11 Checked 48 Re: Red Callout: New item to be added A-007-00 Partition type will be updated in final design. aharm 7/26/2021 18:29 Unchecked 50 Callout A-100-85 Nora - Will signage or placards to direct/guide truck drivers from the loadout building to the truck driver restroom in the main dewatering building be provided? Aric 8/17/2021 11:33 Checked 51 Re: Callout A-100-85 Signage can be provided to direct them to the restroom. With the truckers being part of a contract with the City this can be described to them as well. M Wilson 7/15/2021 16:24 Unchecked 52 Red Callout: New item to be added A-100-85 Confirm symbol is up to date DCrawford 8/18/2021 14:12 Checked 53 Re: Red Callout: New item to be added A-100-85 Will coordinate in final design if necessary. Jonathan Keaney 7/25/2021 16:30 Unchecked 54 Red Callout: New item to be added A-100-85 Spelling DCrawford 8/18/2021 14:11 Checked 55 Re: Red Callout: New item to be added A-100-85 Non-critical clerical comment Jonathan Keaney 7/25/2021 16:30 Unchecked 57 Red Callout: New item to be added A-101-85 Roof Plan? DCrawford 8/18/2021 14:13 Checked 58 Re: Red Callout: New item to be added A-101-85 Non-critical format comment. Jonathan Keaney 7/25/2021 16:25 Unchecked 59 Red Callout: New item to be added A-101-85 Confirm landing size is adequate DCrawford 8/18/2021 14:12 Checked 60 Re: Red Callout: New item to be added A-101-85 Will confirm. Jonathan Keaney 7/25/2021 10:56 Unchecked 61 Red Callout: New item to be added A-101-85 Recommend coordinating keynotes between drawing (typical) DCrawford 8/18/2021 14:12 Checked 62 Re: Red Callout: New item to be added A-101-85 Non-critical format comment. Jonathan Keaney 7/25/2021 10:57 Unchecked 64 Red Callout: New item to be added A-101-85-1 Confirm elevator control room and IT room can open to the process mechanical room DCrawford 8/18/2021 14:15 Checked 65 Re: Red Callout: New item to be added A-101-85-1 These spaces can open to process space. aharm 7/26/2021 18:34 Unchecked 71 Markup Callout A-101-85-2 DO DOORWAYS INCLUDE BOTH A METAL DOOR (FOR SECURITY AND WEATHER) AND A FAST-ACTING FABRIC DOOR FOR NORMAL/SPEEDY ENTRY/EXIT, TYP? MWalkowiak 7/19/2021 10:25 Unchecked 72 Re: Markup Callout A-101-85-2 Given that the City opted for a guard shack and security around the facility, the truck bays are fitted with fast acting fabric doors only as there really is no need for security doors on the building. This represented a pretty significant cost savings to the facility M Wilson 6/30/2021 9:13 Unchecked 73 Red Callout: New item to be added A-101-85-2 Coordinate sheet reference DCrawford 7/20/2021 19:25 Unchecked 74 Re: Red Callout: New item to be added A-101-85-2 Non-critical format comment Jonathan Keaney 7/25/2021 17:32 Unchecked 75 Red Callout: New item to be added A-101-85-2 Confirm matchline is correct DCrawford 8/19/2021 6:29 Checked 76 Re: Red Callout: New item to be added A-101-85-2 Will confirm. Jonathan Keaney 7/25/2021 11:00 Unchecked 77 Red Callout: New item to be added A-101-85-2 Recommend providing an additional door DCrawford 8/19/2021 6:28 Checked 78 Re: Red Callout: New item to be added A-101-85-2 Will consider for final design and incorporate if beneficial. Jonathan Keaney 7/25/2021 17:31 Unchecked 79 Red Callout: New item to be added A-101-85-2 Add symbol to elevations (typical) DCrawford 8/19/2021 6:28 Checked 80 Re: Red Callout: New item to be added A-101-85-2 Non-critical format comment Jonathan Keaney 7/25/2021 17:23 Unchecked 82 Red Callout: New item to be added A-102-85-2 Roof Plan DCrawford 8/19/2021 6:30 Checked 83 Re: Red Callout: New item to be added A-102-85-2 Drawing title includes roof plan. Jonathan Keaney 7/25/2021 16:18 Unchecked 84 Red Callout: New item to be added A-102-85-2 Confirm matchline is correct DCrawford 8/19/2021 6:29 Checked 85 Re: Red Callout: New item to be added A-102-85-2 Will confirm. Jonathan Keaney 7/25/2021 11:00 Unchecked 86 Red Callout: New item to be added A-102-85-2 Indicate roof drainage DCrawford 8/19/2021 6:29 Checked 87 Re: Red Callout: New item to be added A-102-85-2 Will coordinate and include in final design. Jonathan Keaney 7/25/2021 17:24 Unchecked 88 Red Callout: New item to be added A-102-85-2 Confirm steel is extending through the roof DCrawford 8/19/2021 6:29 Checked 89 Re: Red Callout: New item to be added A-102-85-2 Steel is extending beyond roof level. Detailing will be coordinated at final design. aharm 7/26/2021 19:05 Unchecked 91 Red Callout: New item to be added A-103-85-2 Provide general and sheet notes DCrawford 8/19/2021 6:30 Checked 92 Re: Red Callout: New item to be added A-103-85-2 Detail will be added in final design if deemed necessary. Jonathan Keaney 7/25/2021 16:12 Unchecked 93 Red Callout: New item to be added A-103-85-2 ED DCrawford 7/20/2021 19:31 Unchecked 94 Re: Red Callout: New item to be added A-103-85-2 Non-critical clerical comment. Jonathan Keaney 7/25/2021 11:00 Unchecked 95 Red Callout: New item to be added A-103-85-2 Label reflected ceiling plan DCrawford 8/19/2021 6:30 Checked 96 Re: Red Callout: New item to be added A-103-85-2 Non-critical format comment Jonathan Keaney 7/25/2021 17:22 Unchecked Friday, October 1, 2021
Dan Stewart, 55 rmaidrand(RC), 4
rmaidrand(NC), 1
Bruce Petrik, 52
Mike Walkowiak, 193
Michael C, 14
Marc Nakamoto, 16
Pmurphy, 54 Phil Atkinson, 25 Amit Mutsuddy, 11
AndyW, 70
Aric, 77
Bryan O&M, 12
Sbarker, 16
Domenic Onorato, 12
Eric.Hovland, 60
SputhuveeduPalani, 7
Dcrawford, 94 Tim Lewis, 7 DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 97 Red Callout: New item to be added A-103-85-2 Provide overall building dimensions DCrawford 8/19/2021 6:30 Checked 98 Re: Red Callout: New item to be added A-103-85-2 Non-critical format comment Jonathan Keaney 7/25/2021 17:21 Unchecked 100 Cloud+ A-104-85-1 AM: how will maintenance access these gearboxes Amit Mutsuddy 7/12/2021 9:31 Unchecked 101 Re: Cloud+ A-104-85-1 This was discussed in Technical meetings with the City and is planned for a personnel hoist for access, regularly scheduled maintenance (greasing, etc) will be extended to an accessible level. M Wilson 7/14/2021 10:00 Unchecked 102 Cloud+ A-104-85-1 AM: maintenance access not provided, how will the PM to be done Amit Mutsuddy 7/12/2021 9:30 Unchecked 103 Re: Cloud+ A-104-85-1 Plan was agreed to access via a boom hoist. As a part of the 60% review a platform was requested and a conceptual sketch was provided to the City M Wilson 8/2/2021 11:20 Unchecked 104 Red Callout: New item to be added A-104-85-1 Provide room number DCrawford 8/18/2021 14:16 Checked 105 Re: Red Callout: New item to be added A-104-85-1 Note should read at ELECTRICAL ROOM ROOF. This is not a room space. aharm 7/26/2021 18:35 Unchecked 106 Cloud+ A-104-85-1 Confirm a vestibule is not required separating the office from the centrifuge room DCrawford 8/18/2021 14:16 Checked 107 Re: Cloud+ A-104-85-1 Vestibule is not required. aharm 7/26/2021 18:35 Unchecked 109 Cloud+ A-105-85-1 maintenance access not available Amit Mutsuddy 7/12/2021 9:32 Unchecked 110 Re: Cloud+ A-105-85-1 Plan was agreed to access via a boom hoist. As a part of the 60% review a platform was requested and a conceptual sketch was provided to the City M Wilson 8/2/2021 11:21 Unchecked 111 Red Callout: New item to be added A-105-85-1 Provide interior elevations DCrawford 8/18/2021 14:17 Checked 112 Re: Red Callout: New item to be added A-105-85-1 Will provide interior elevations at final design. aharm 7/26/2021 18:42 Unchecked 114 Red Callout: New item to be added A-106-85-1 Provide interior elevations DCrawford 8/18/2021 14:17 Checked 115 Re: Red Callout: New item to be added A-106-85-1 Will provide interior elevations at final design. aharm 7/26/2021 18:41 Unchecked 118 Callout A-107-85-1 Jose C. - Provide roof area of drainage for each roof drain section. Need Pipe size and slope. (Typ. A- 108-85-1, 109 - 85-1) Aric 7/6/2021 16:07 Unchecked 119 Re: Callout A-107-85-1 Area calculations for the drainage systems are provided in the calculations package. Drain piping sizing M Wilson 7/8/2021 12:42 Unchecked 121 Red Callout: New item to be added A-108-85-1 Indicate high and low points and thickness of insulation DCrawford 8/18/2021 14:18 Checked 122 Re: Red Callout: New item to be added A-108-85-1 Will be coordinated and detailed for 100% documents. Jonathan Keaney 7/25/2021 10:17 Unchecked 123 Red Callout: New item to be added A-108-85-1 Indicate extent of walkway pads DCrawford 8/18/2021 14:18 Checked 124 Re: Red Callout: New item to be added A-108-85-1 Will coordinate. Jonathan Keaney 7/23/2021 7:25 Unchecked 125 Red Callout: New item to be added A-108-85-1 Remove door swings DCrawford 8/18/2021 14:17 Checked 126 Re: Red Callout: New item to be added A-108-85-1 Will correct. aharm 7/26/2021 18:43 Unchecked 128 Red Callout: New item to be added A-109-85-1 Indicate roof slope DCrawford 8/18/2021 14:18 Checked 129 Re: Red Callout: New item to be added A-109-85-1 Will coordinate with structural, the top of these wet wells is concrete. Slope away from building will be coordinated in final design. aharm 7/26/2021 18:44 Unchecked 130 Red Callout: New item to be added A-109-85-1 Indicate high and low points and thickness of insulation DCrawford 8/18/2021 14:18 Checked 131 Re: Red Callout: New item to be added A-109-85-1 Will be coordinated and detailed for 100% documents. Jonathan Keaney 7/25/2021 10:17 Unchecked 132 Red Callout: New item to be added A-109-85-1 Indicate extent of walkway pads DCrawford 8/18/2021 14:18 Checked 133 Re: Red Callout: New item to be added A-109-85-1 Will coordinate. Jonathan Keaney 7/23/2021 7:25 Unchecked 135 Red Callout: New item to be added A-110-85-1 Confirm graphics are correctly shown DCrawford 8/18/2021 14:18 Checked 136 Re: Red Callout: New item to be added A-110-85-1 Non-critical format comment. Jonathan Keaney 7/25/2021 10:22 Unchecked 138 Red Callout: New item to be added A-201-84 Confirm package unit is correctly shown DCrawford 7/20/2021 20:06 Unchecked 139 Re: Red Callout: New item to be added A-201-84 Package unit is as designed see HVAC drawings. aharm 7/26/2021 18:31 Unchecked 140 Red Callout: New item to be added A-201-84 Recommend including vertical dimensions DCrawford 7/20/2021 20:07 Unchecked 141 Re: Red Callout: New item to be added A-201-84 Non-critical format comment. Jonathan Keaney 7/25/2021 10:57 Unchecked 142 Red Callout: New item to be added A-201-84 Extend leader line DCrawford 7/20/2021 20:07 Unchecked 143 Re: Red Callout: New item to be added A-201-84 Non-critical format comment. Jonathan Keaney 7/25/2021 10:57 Unchecked 144 Red Callout: New item to be added A-201-84 Confirm guardrail extent past riser is correct DCrawford 7/20/2021 20:11 Unchecked 145 Re: Red Callout: New item to be added A-201-84 Will confirm. Jonathan Keaney 7/25/2021 10:55 Unchecked 147 Red Callout: New item to be added A-201-85-1 Recommend incorporating vertical dimensions (typical) DCrawford 8/19/2021 6:19 Checked 148 Re: Red Callout: New item to be added A-201-85-1 Non-critical format comment Jonathan Keaney 7/25/2021 17:20 Unchecked 149 Red Callout: New item to be added A-201-85-1 Provide proper extent of guardrail and handrail (typical) DCrawford 8/19/2021 6:19 Checked 150 Re: Red Callout: New item to be added A-201-85-1 Railing modeling will be corrected in final design. aharm 7/26/2021 18:48 Unchecked 151 Red Callout: New item to be added A-201-85-1 Consider alternative stair system to avoid future maintenance (typical) DCrawford 8/19/2021 6:19 Checked 152 Re: Red Callout: New item to be added A-201-85-1 Will coordinate with corrosion, structural, and builder teams to confirm stair system is appropriate. aharm 7/26/2021 18:47 Unchecked 153 Red Callout: New item to be added A-201-85-1 Consider anodized aluminum railing system to avoid future maintenance (typical) DCrawford 8/19/2021 6:19 Checked 154 Re: Red Callout: New item to be added A-201-85-1 Will coordinate with corrosion, structural, and builder teams to confirm railing system is appropriate. aharm 7/26/2021 18:47 Unchecked 156 Cloud+ A-201-85-2 Zoning requirement: mechanical equipment needs to be hidden/screened from street view. Scheme at 30% had the wall higher, I know it was removed due to cost, but it cannot be exposed as shown in this elevation. Domenic Onorato 7/13/2021 20:12 Unchecked 157 Re: Cloud+ A-201-85-2 City to provide guidance on if additional screening is needed. Code reference provided appears to be for Mechanical equipment, such as HVAC Equipment. Additional screening will be a cost adder to the project. M Wilson 8/3/2021 5:19 Unchecked 158 Red Callout: New item to be added A-201-85-2 Key in elevation (typical) DCrawford 8/19/2021 6:31 Checked 159 Re: Red Callout: New item to be added A-201-85-2 Will add. aharm 7/26/2021 19:07 Unchecked 160 Red Callout: New item to be added A-201-85-2 Consider anodized aluminum railing system to avoid future maintenance (typical) DCrawford 8/19/2021 6:30 Checked 161 Re: Red Callout: New item to be added A-201-85-2 Will coordinate with corrosion, structural, and builder teams to confirm stair system is appropriate. aharm 7/26/2021 19:07 Unchecked 163 Callout A-202-85-1 Nora - Visible electronic signs/displays over the rollup doors to indicate if a bay is available or occupied are missing/not shown. Aric 8/17/2021 11:33 Checked 164 Re: Callout A-202-85-1 Refer to I-615-85 and I-616-85, the entrance and position lights are shown, they will be provided to be visible on the outside of the facility M Wilson 7/11/2021 15:31 Unchecked 166 Red Callout: New item to be added A-202-85-2 Consider alternative stair system to avoid future maintenance (typical) DCrawford 8/19/2021 6:31 Checked 167 Re: Red Callout: New item to be added A-202-85-2 Will coordinate with corrosion, structural, and builder teams to confirm stair system is appropriate. aharm 7/26/2021 19:08 Unchecked 168 Red Callout: New item to be added A-202-85-2 Recommend providing vertical dimensions DCrawford 8/19/2021 6:31 Checked 169 Re: Red Callout: New item to be added A-202-85-2 Non-critical format comment. Jonathan Keaney 7/25/2021 10:59 Unchecked 171 Cloud+ A-203-85-2 Equipment needs to be screened. Domenic Onorato 7/13/2021 20:12 Unchecked 172 Re: Cloud+ A-203-85-2 City to provide guidance on if additional screening is required, will be added cost to the project to increase screening level of facilities M Wilson 7/27/2021 7:00 Unchecked 173 Red Callout: New item to be added A-203-85-2 Remove DCrawford 8/19/2021 6:31 Checked 174 Re: Red Callout: New item to be added A-203-85-2 Non-critical format comment. Will remove or update based on design progression. Jonathan Keaney 7/25/2021 10:59 Unchecked 176 Cloud+ A-204-85-2 screened if seen from the street. Domenic Onorato 7/13/2021 20:13 Unchecked 177 Re: Cloud+ A-204-85-2 City to provide guidance on if additional screening is required, will be added cost to the project to increase screening level of facilities M Wilson 7/27/2021 7:01 Unchecked 178 Red Callout: New item to be added A-204-85-2 Confirm support is required at this location DCrawford 8/19/2021 6:31 Checked 179 Re: Red Callout: New item to be added A-204-85-2 Will confirm. Jonathan Keaney 7/25/2021 10:58 Unchecked 180 Red Callout: New item to be added A-204-85-2 Provide metal coping DCrawford 8/19/2021 6:32 Checked 181 Re: Red Callout: New item to be added A-204-85-2 Will provide coping at final design. aharm 7/26/2021 19:09 Unchecked 182 Red Callout: New item to be added A-204-85-2 Modify leader line DCrawford 8/19/2021 6:32 Checked 183 Re: Red Callout: New item to be added A-204-85-2 Non-critical format comment. Jonathan Keaney 7/25/2021 10:58 Unchecked 185 Red Callout: New item to be added A-301-84 Recommend modifying graphics difficult to read in section (typical) DCrawford 8/18/2021 14:14 Checked 186 Re: Red Callout: New item to be added A-301-84 Non-critical format comment. Jonathan Keaney 7/25/2021 10:56 Unchecked 187 Red Callout: New item to be added A-301-84 Label building sections DCrawford 8/18/2021 14:14 Checked 188 Re: Red Callout: New item to be added A-301-84 Non-critical format comment. Jonathan Keaney 7/25/2021 10:56 Unchecked 189 Red Callout: New item to be added A-301-84 Recommend including vertical dimensions DCrawford 8/18/2021 14:14 Checked 190 Re: Red Callout: New item to be added A-301-84 Non-critical format comment. Jonathan Keaney 7/25/2021 10:56 Unchecked 191 Red Callout: New item to be added A-301-84 Indicate handrail DCrawford 8/18/2021 14:14 Checked 192 Re: Red Callout: New item to be added A-301-84 Non-critical format comment. Jonathan Keaney 7/25/2021 10:55 Unchecked 193 Red Callout: New item to be added A-301-84 Confirm guardrail extent past riser is correct DCrawford 8/18/2021 14:14 Checked 194 Re: Red Callout: New item to be added A-301-84 Will confirm. Jonathan Keaney 7/25/2021 10:55 Unchecked 196 Red Callout: New item to be added A-301-85-1 Label building section (typical) DCrawford 8/19/2021 6:20 Checked 197 Re: Red Callout: New item to be added A-301-85-1 Please confirm if intention is to annotate materials or something else. aharm 7/26/2021 18:50 Unchecked 199 Red Callout: New item to be added A-301-85-2 Recommend modifying graphics difficult to read in section (typical) DCrawford 8/19/2021 6:32 Checked 200 Re: Red Callout: New item to be added A-301-85-2 Non-critical format comment. Jonathan Keaney 7/25/2021 10:58 Unchecked 202 Red Callout: New item to be added A-302-85-1 Provide dimensions on all elevations and building sections DCrawford 8/19/2021 6:20 Checked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 203 Re: Red Callout: New item to be added A-302-85-1 Non-critical format comment Jonathan Keaney 7/25/2021 17:19 Unchecked 205 Red Callout: New item to be added A-302-85-2 Remove blue lines (typ) DCrawford 8/19/2021 6:32 Checked 206 Re: Red Callout: New item to be added A-302-85-2 Non-critical format comment. Jonathan Keaney 7/25/2021 16:11 Unchecked 208 Red Callout: New item to be added A-303-85-2 Label wall sections DCrawford 8/19/2021 6:32 Checked 209 Re: Red Callout: New item to be added A-303-85-2 Non-critical format comment Jonathan Keaney 7/25/2021 17:31 Unchecked 210 Re: Red Callout: New item to be added A-303-85-2 Notes will be added in next phase. aharm 7/26/2021 19:10 Unchecked 212 Red Callout: New item to be added A-401-85-1 Label all rooms DCrawford 8/19/2021 6:21 Checked 213 Re: Red Callout: New item to be added A-401-85-1 Non-critical format comment Jonathan Keaney 7/25/2021 18:01 Unchecked 215 Callout A-402-85-1 Jose C - Provide all measurements for ADA restrooms. Valves, sink, toilet, etc.. Aric 7/6/2021 16:08 Unchecked 216 Re: Callout A-402-85-1 See A-505-85-1 for ADA placement of toilet accessories. Will provide other dimensions in elevations and plans in final design. aharm 7/26/2021 18:54 Unchecked 218 Text Box A-402-85-1 Need the ADA sheet. Domenic Onorato 7/13/2021 20:08 Unchecked 219 Re: Text Box A-402-85-1 See A-505-85-1 aharm 7/26/2021 18:55 Unchecked 220 Cloud+ A-402-85-1 confirm ADA clearances, and pipe cover protectors. Domenic Onorato 7/13/2021 20:08 Unchecked 221 Re: Cloud+ A-402-85-1 Will confirm in final design. aharm 7/26/2021 18:55 Unchecked 222 Red Callout: New item to be added A-402-85-1 Provide sloping tops above lockers DCrawford 8/19/2021 6:21 Checked 223 Re: Red Callout: New item to be added A-402-85-1 Non-critical comment. Will review. Jonathan Keaney 7/25/2021 10:17 Unchecked 225 Red Callout: New item to be added A-406-85-1 Complete stair plans and sections for next submittal DCrawford 8/19/2021 6:22 Checked 226 Re: Red Callout: New item to be added A-406-85-1 Noted. Jonathan Keaney 7/23/2021 6:52 Unchecked 228 Red Callout: New item to be added A-407-85-1 Indicate handrail and extension past last riser DCrawford 8/19/2021 6:22 Checked 229 Re: Red Callout: New item to be added A-407-85-1 Will coordinate in final design if necessary. Jonathan Keaney 7/25/2021 17:02 Unchecked 231 Red Callout: New item to be added A-408-85-1 Provide general notes and sheet notes DCrawford 8/19/2021 6:22 Checked 232 Re: Red Callout: New item to be added A-408-85-1 Notes will be added if necessary at 100%. Jonathan Keaney 7/25/2021 10:21 Unchecked 233 Red Callout: New item to be added A-408-85-1 Label plans and section DCrawford 8/19/2021 6:22 Checked 234 Re: Red Callout: New item to be added A-408-85-1 Non-critical format comment Jonathan Keaney 7/23/2021 6:56 Unchecked 236 Red Callout: New item to be added A-501-85-1 Recommend sloping concrete at door DCrawford 8/19/2021 6:23 Checked 237 Re: Red Callout: New item to be added A-501-85-1 Will consider and incorporate in 100% if appropriate. Jonathan Keaney 7/25/2021 10:20 Unchecked 239 Red Callout: New item to be added A-501-85-1 Label detail DCrawford 8/19/2021 6:23 Checked 240 Re: Red Callout: New item to be added A-501-85-1 Non-critical format comment. Jonathan Keaney 7/23/2021 6:56 Unchecked 241 Red Callout: New item to be added A-501-85-1 Label detail DCrawford 8/19/2021 6:23 Checked 242 Re: Red Callout: New item to be added A-501-85-1 Non-critical format comment. Jonathan Keaney 7/23/2021 6:56 Unchecked 243 Red Callout: New item to be added A-501-85-1 Indicate anchorage for wood blocking DCrawford 8/19/2021 6:23 Checked 244 Re: Red Callout: New item to be added A-501-85-1 Will be coordinated and detailed for 100% documents. Jonathan Keaney 7/25/2021 10:18 Unchecked 246 Red Callout: New item to be added A-502-85-1 Indicate anchorage for blocking DCrawford 8/19/2021 6:23 Checked 247 Re: Red Callout: New item to be added A-502-85-1 Will be coordinated and detailed for 100% documents. Jonathan Keaney 7/25/2021 10:18 Unchecked 249 Red Callout: New item to be added A-503-85-1 Label detail DCrawford 8/19/2021 6:24 Checked 250 Re: Red Callout: New item to be added A-503-85-1 Non-critical format comment Jonathan Keaney 7/23/2021 6:56 Unchecked 251 Red Callout: New item to be added A-503-85-1 Label detail DCrawford 7/20/2021 21:10 Unchecked 252 Re: Red Callout: New item to be added A-503-85-1 Non-critical format comment. Jonathan Keaney 7/23/2021 6:56 Unchecked 253 Red Callout: New item to be added A-503-85-1 Label detail DCrawford 8/19/2021 6:24 Checked 254 Re: Red Callout: New item to be added A-503-85-1 Non-critical format comment. Jonathan Keaney 7/23/2021 6:55 Unchecked 255 Red Callout: New item to be added A-503-85-1 Coordinate copings DCrawford 8/19/2021 6:24 Checked 256 Re: Red Callout: New item to be added A-503-85-1 Non-critical design progression comment. Will coordinate. Jonathan Keaney 7/23/2021 6:55 Unchecked 257 Red Callout: New item to be added A-503-85-1 Spelling DCrawford 8/19/2021 6:24 Checked 258 Re: Red Callout: New item to be added A-503-85-1 Non-critical clerical comment. Will correct. Jonathan Keaney 7/23/2021 7:27 Unchecked 259 Red Callout: New item to be added A-503-85-1 Coordinate location of flashing DCrawford 8/19/2021 6:24 Checked 260 Re: Red Callout: New item to be added A-503-85-1 Will coordinate. Jonathan Keaney 7/25/2021 10:15 Unchecked 262 Red Callout: New item to be added A-505-85-1 Coordinate date DCrawford 8/19/2021 6:25 Checked 263 Re: Red Callout: New item to be added A-505-85-1 Will update as appropriate. Jonathan Keaney 7/23/2021 6:53 Unchecked 264 Red Callout: New item to be added A-505-85-1 Spelling DCrawford 8/19/2021 6:25 Checked 265 Re: Red Callout: New item to be added A-505-85-1 Non critical clerical comment. Will correct. Jonathan Keaney 7/23/2021 6:54 Unchecked 267 Red Callout: New item to be added A-506-85-1 Storefront DCrawford 8/19/2021 6:25 Checked 268 Re: Red Callout: New item to be added A-506-85-1 Unclear what is intended. detail will be reviewed to confirm accuracy. Jonathan Keaney 7/25/2021 10:16 Unchecked 270 Red Callout: New item to be added A-601-84 Add to finish schedule DCrawford 8/18/2021 14:15 Checked 271 Re: Red Callout: New item to be added A-601-84 Will coordinate in final design as necessary. Jonathan Keaney 7/25/2021 16:25 Unchecked 272 Red Callout: New item to be added A-601-84 Add height DCrawford 8/18/2021 14:15 Checked 273 Re: Red Callout: New item to be added A-601-84 Will provide in final design Jonathan Keaney 7/25/2021 16:25 Unchecked 275 Red Callout: New item to be added A-601-85-2 Recommend adding interior finish legend to this drawing similar to the electrical building DCrawford 8/19/2021 6:32 Checked 276 Re: Red Callout: New item to be added A-601-85-2 Will consider in final design. Jonathan Keaney 7/25/2021 17:32 Unchecked 279 Cloud+ A-602-85-1 Recommend separating doors by building DCrawford 8/19/2021 6:26 Checked 280 Re: Cloud+ A-602-85-1 Non-critical format comment Jonathan Keaney 7/25/2021 17:58 Unchecked 281 Re: Cloud+ A-602-85-1 Will break out each facilities doors into separate schedules. aharm 7/26/2021 19:01 Unchecked 282 Red Callout: New item to be added A-602-85-1 Recommend 8'-0" high doors for industrial facilities DCrawford 8/19/2021 6:28 Checked 283 Re: Red Callout: New item to be added A-602-85-1 No change. Jonathan Keaney 7/25/2021 17:59 Unchecked 284 Re: Re: Red Callout: New item to be added A-602-85-1 Recommend reconsidering response DCrawford 8/19/2021 6:26 Unchecked 285 Red Callout: New item to be added A-602-85-1 Coordinate notes DCrawford 8/19/2021 6:27 Checked 286 Re: Red Callout: New item to be added A-602-85-1 Will coordinate for final design. Jonathan Keaney 7/25/2021 17:33 Unchecked 287 Cloud+ A-602-85-1 Recommend providing legend on this drawing for materials and finishes DCrawford 8/19/2021 6:27 Checked 288 Re: Cloud+ A-602-85-1 Legend will be added at final design aharm 7/26/2021 19:01 Unchecked 290 Cloud+ A-901-85 Equipment needs to screened Domenic Onorato 7/13/2021 20:14 Unchecked 291 Re: Cloud+ A-901-85 City to provide guidance on if additional screening is required, will be added cost to the project to increase screening level of facilities M Wilson 7/27/2021 7:01 Unchecked 293 Cloud+ A-902-85 equipment needs to be screened. Domenic Onorato 8/11/2021 8:45 Unchecked 294 Re: Cloud+ A-902-85 City to provide guidance on if additional screening is required, will be added cost to the project to increase screening level of facilities M Wilson 7/27/2021 7:01 Unchecked 297 Cloud+ A-902-85 Semi transparent rollup doors Tim Lewis 7/20/2021 13:32 Unchecked 298 Re: Cloud+ A-902-85 Will consider in final design. aharm 7/26/2021 19:12 Unchecked 299 Red Callout: New item to be added A-902-85 Northwest perspective is also shown on drawing A-901-85, please coordinate DCrawford 8/19/2021 6:33 Checked 300 Re: Red Callout: New item to be added A-902-85 Will coordinate for final design. Jonathan Keaney 7/25/2021 17:58 Unchecked 302 Cloud+ A-903-85 Need a cover Bryan O&M 7/6/2021 12:50 Unchecked 303 Re: Cloud+ A-903-85 If a cover is desired by the City, one can be provided. Covers for only the equipment panels would be a bit more difficult as the panels are intermixed with the location of the ladders. City to provide direction on if a cover is required M Wilson 8/2/2021 11:04 Unchecked 307 Markup Callout C-101-85 MOVE STAIRS AROUND CORNER TO AVOID CONFLICT WITH DELIVERY TRUCK. MWalkowiak 7/19/2021 10:12 Unchecked 308 Re: Markup Callout C-101-85 Noted. See responses to comments on the D sheets on the same subject M Wilson 6/29/2021 8:36 Unchecked 310 Markup Callout C-101-85 ARE A PEDESTRIAN GATE AND WALKWAY NEEDED TO ACCESS GUARD SHACK? MWalkowiak 6/24/2021 8:19 Unchecked 311 Re: Markup Callout C-101-85 Will work with the City staff on requirements for access in and out of the Guard Shack. Location was determined late in the development of the 60% design and all aspects of it were not fully discussed. Can be provided if desired and costs agreed to. M Wilson 7/20/2021 10:50 Unchecked 313 Markup Callout C-101-85 ARE THESE ISLANDS PAVED WITH AC, OR DOES IT HAVE SOME OTHER TYPE OF SURFACING (E.G. PORTLAND CEMENT CONCRETE)? MWalkowiak 6/24/2021 8:59 Unchecked 314 Re: Markup Callout C-101-85 Islands are not paved, they are to be landscaped. Refer to Landscaping plans for information on materials to be placed in the islands M Wilson 7/20/2021 10:52 Unchecked 315 Re: Re: Markup Callout C-101-85 This drawing should be corrected to be consistent with other drawings. MWalkowiak 7/19/2021 10:13 Unchecked 316 Re: Re: Re: Markup Callout C-101-85 This is understood. The hatching shown is consistent with this, other than the pads around the transformers, which will be corrected M Wilson 7/26/2021 7:53 Unchecked 319 Arrow C-101-85 Does this driving path around the islands create a potential safety risk? Do the transformers create a blind turn? MNakamoto 7/19/2021 12:50 Checked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 320 Re: Arrow C-101-85 No, vehicles entering from Zanker should only be City vehicles per discussions on the use of that entrance, and access to the parking etc should not require going to the north of the transformers. Regardless the transformers are not so high that visual observation of a truck exiting the truck bays could not be seenM Wilson 6/29/2021 8:30 Unchecked 321 Arc C-101-85 Confirm traffic safety of traffic coming east direction with view blocked by transformers and truck turning out of load out facility. MNakamoto 7/19/2021 12:51 Checked 322 Re: Arc C-101-85 See previous comment on same subject, there should be no conflict as its laid out M Wilson 6/29/2021 8:31 Unchecked 323 Cloud+ C-101-85 Can crane drive/park for stable surface and maintenance of conveyors MNakamoto 7/29/2021 21:41 Checked 324 Re: Cloud+ C-101-85 Yes, the parking area is suitable for crane or hoist to be located for maintenance of the conveyors, etc that would need to be accessed from that area M Wilson 6/29/2021 8:33 Unchecked 325 Text Box C-101-85 Perhaps a parking area for the guard near the guard shack rather than across the entire new building? Eric.Hovland 7/14/2021 9:04 Unchecked 326 Re: Text Box C-101-85 Will work with City staff to define parking area for guard if parking at the facility is not adequate M Wilson 7/22/2021 17:40 Unchecked 328 Callout C-101-85 Why is this not part of the parking lot/paved area so that a vehicle can drive up to these areas? Eric.Hovland 7/14/2021 9:09 Unchecked 329 Re: Callout C-101-85 Both systems utilize small, lighweight equipment that can be pulled and carried to a vehicle. If desired, gravel can be extended in this area. Areas is also planned for landscaping to help screen the equipment from view M Wilson 7/22/2021 17:42 Unchecked 331 Callout C-101-85 show section where new fensing is required (demo's during pipe installation) bpetrik 8/5/2021 8:36 Checked 332 Re: Callout C-101-85 Details of the fencing, including where fencing will be demolished and replaced will be provided as a part of the final design M Wilson 8/3/2021 5:22 Unchecked 336 Markup Callout C-102-85 CAN WTR PIPING BE ROUTED TO MAXIMIZE RETENTION OF USABLE AREA? MWalkowiak 7/19/2021 10:16 Unchecked 338 Re: Markup Callout C-102-85 The WTR 3 and 4 Piping is not routed further north in the space as there is an electrical duct bank that traverses from the handholes at Zanker to the Transformers in the area, and a 12" SD line. Moving the lines to the north would require multiple crossings and higher costs. M Wilson 6/30/2021 16:05 Unchecked 340 Markup Callout C-102-85 HOW CAN THESE PIPES BE DRAINED FOR MAINTENANCE? MWalkowiak 6/24/2021 8:34 Unchecked 341 Re: Markup Callout C-102-85 The lines would not be drained. Flushing connections will be provided on the TRS and CEN lines to allow for flushing and cleaning, which at the conclusion of the lines can remain with water. Should the lines have to be cut into, they can be drained at the location of where they will be cut into at that time M Wilson 6/30/2021 16:10 Unchecked 342 Re: Re: Markup Callout C-102-85 Has this mode of operation been discussed with City O&M? MWalkowiak 7/19/2021 10:17 Unchecked 343 Re: Re: Re: Markup Callout C-102-85 Operations of the pipelines was outlined in the BODR. City staff will have to comment on their understanding of the operation of the lines M Wilson 7/26/2021 7:55 Unchecked 344 Callout C-102-85 Drawing indicates 10" RW will connect to 10" W3. Isolation Valves need to be installed for both the W3 and RW lines. - Kent B. Michael C 7/29/2021 14:35 Checked 345 Re: Callout C-102-85 The line would not directly connect. There will be additional details to show how the two lines are connected in the final design, including the use of a removable spool to avoid any interconnection. M Wilson 6/30/2021 16:07 Unchecked 346 Callout C-102-85 All Fire Hydrants need an isolation valve installed on the lateral. - Kent B. Michael C 7/29/2021 14:35 Checked 347 Re: Callout C-102-85 This is understood. The final design will have a detail for the hydrant, which will include the hydrant isolation valve per the City's standards M Wilson 6/30/2021 16:11 Unchecked 348 Callout C-102-85 Water Meter needs to be included for the RW line. - Kent B Michael C 8/3/2021 14:17 Checked 349 Re: Callout C-102-85 There will be a meter on the RW line for water used at the facility, it will be above grade in the area to the west of the parking area and will be shown for the final design M Wilson 8/2/2021 10:01 Unchecked 350 Callout C-102-85 Jose C. -Provide details. Must be included in plans/Drawings Aric 7/6/2021 15:48 Unchecked 351 Re: Callout C-102-85 System is being purchased as a packaged system, details not necessary or appropriate as the system will be fabricated by the manufacturer M Wilson 7/8/2021 5:11 Unchecked 353 Callout C-102-85 Jose C. - Not in the Plans Aric 7/6/2021 15:50 Unchecked 354 Re: Callout C-102-85 Drawing was inadvertently left out of set, will be provided M Wilson 7/8/2021 5:11 Unchecked 356 Callout C-102-85 Jose C. - see note above for #8 Aric 7/6/2021 15:57 Unchecked 357 Re: Callout C-102-85 See response to note 8 M Wilson 7/8/2021 5:12 Unchecked 359 Callout C-102-85 Jose C. - is this a pumped system or gravity?if gravity, then 2 fixture count per GPM to size receiving pipe. Provide details on connection, ejector pump GPM, etc. Aric 7/6/2021 15:54 Unchecked 360 Re: Callout C-102-85 It's a pumped system. Pumps are submersible in the SS pump station, and the pumps are specified in Specification Section 22.13.29.16 M Wilson 7/8/2021 11:39 Unchecked 362 Callout C-102-85 Kent B: Can the 2" service line accommodate demand for both the New Dewatering Facility and existing Transmission Pump Station? Michael C 8/3/2021 14:17 Checked 363 Re: Callout C-102-85 Yes, the actual demand of the pump station is minimal as it is unmanned and the line only serves the pump station M Wilson 8/3/2021 4:59 Unchecked 364 Callout C-102-85 Kent B: Why is a larger diameter pipe size (3") being connected to the 2" Water 1 line? Michael C 7/29/2021 14:36 Checked 365 Re: Callout C-102-85 The City has indicated that they may add additional facilities to the east of the new facility and the larger pipe size will allow for a potential connection to the 3 inch for the future facility M Wilson 7/22/2021 17:44 Unchecked 366 Callout C-102-85 Kent B: Is the existing 3" line large enough to meet the capacity of both facilities? Michael C 7/29/2021 14:36 Checked 367 Re: Callout C-102-85 Yes, the existing pump station pumps only sample water and the operation records showed that the operation is less than once per hour M Wilson 7/22/2021 17:45 Unchecked 368 Callout C-102-85 AM: Pothole Verify Milpitas Main and show existing right of entry easement limits Amit Mutsuddy 7/7/2021 13:42 Unchecked 369 Re: Callout C-102-85 Will show line and easement per record drawings and if location confirmed via potholing, the info will be modified accordingly M Wilson 7/22/2021 17:46 Unchecked 370 Callout C-102-85 Is this 4-inch RW line Amit Mutsuddy 7/7/2021 12:58 Unchecked 371 Re: Callout C-102-85 Don't believe so. Will verify with GIS documents and update accordingly M Wilson 7/29/2021 12:20 Unchecked 372 Callout C-102-85 AM: this is for SVWPC dedicated connection for their #1 water supply, RWF should not connect to this line Amit Mutsuddy 7/7/2021 14:02 Unchecked 373 Re: Callout C-102-85 The use of this line for WTR 1 supply to the new facility was discussed with the City prior to the design as shown. If this connection cannot be used, please provide direction on if a separate connection to Muni water in Zanker should be used, or a connection within the plant site should be used M Wilson 7/8/2021 5:36 Unchecked 374 Callout C-102-85 Kent B: A backflow device needs to be installed for the RW line. Michael C 8/3/2021 14:17 Checked 375 Re: Callout C-102-85 Yes, this will be detailed along with the water meter noted in a previous comment M Wilson 8/2/2021 10:02 Unchecked 376 Callout C-102-85 Kent B: Drawing indicates a tee for the hydrant lines prior to the line entering the building. Isolation Valves need to be installed at the tee. Michael C 7/29/2021 14:36 Checked 377 Re: Callout C-102-85 This is understood. The final design will have a detail for the hydrant, which will include the hydrant isolation valve per the City's standards Jonathan Keaney 7/25/2021 18:36 Unchecked 386 Markup Callout C-201-00 HOW CAN THESE PIPES BE DRAINED FOR MAINTENANCE? COMMENT APPLIES TO OTHER PIPELLINE DRAWINGS. MWalkowiak 6/24/2021 8:39 Unchecked 387 Re: Markup Callout C-201-00 See response to same question on C-102-85 M Wilson 6/30/2021 16:14 Unchecked 388 Markup Callout C-201-00 WILL PERIODIC ISOLATION VALVES BE PROVIDED SO PORTIONS OF PIPE CAN BE MAINTAINED WITHOUT DRAINING ENTIRE PIPE? COMMENT APPLIES TO OTHER PIPELINE DRAWINGS. MWalkowiak 6/24/2021 8:38 Unchecked 389 Re: Markup Callout C-201-00 No intermediate valves are planned for these lines. M Wilson 6/30/2021 16:13 Unchecked 390 Re: Re: Markup Callout C-201-00 Has lack of isolation valves been reviewed with City O&M staff? MWalkowiak 7/19/2021 10:19 Unchecked 391 Re: Re: Re: Markup Callout C-201-00 Operations of the pipelines was outlined in the BODR. City staff will have to comment on their understanding of the operation of the lines M Wilson 7/26/2021 7:55 Unchecked 393 Markup Callout C-201-00 WHAT DETAIL IS TO BE USED? SHOULD USE COMBINATION AIR RELEASE AND VACUUM VALVES, NOT ARVs. MWalkowiak 6/24/2021 8:54 Unchecked 394 Re: Markup Callout C-201-00 The specifics of the valves to be used will be provided, along with a detail for the installation, in the final design. M Wilson 6/30/2021 16:16 Unchecked 395 Note C-201-00 The piping profile indicates an air release valve. Provide standard detail for this assenbly bpetrik 7/28/2021 11:26 Checked 396 Re: Note C-201-00 The specifics of the valves to be used will be provided, along with a detail for the installation, in the final design. M Wilson 6/30/2021 16:17 Unchecked 397 Callout C-201-00 AM: where do these pipes connect to? SWPS connect to what? Amit Mutsuddy 7/7/2021 14:05 Unchecked 398 Re: Callout C-201-00 As noted in Keynote #1 the continuation of these lines will be by others (Headworks project) who will pick them up from that point and route them to either the Headworks, or EBOS. M Wilson 7/8/2021 5:37 Unchecked 401 Markup Callout C-202-00 ARE LOW-POINT BLOWOFF/DRAIN VALVES REQUIRED? MWalkowiak 6/24/2021 8:49 Unchecked 402 Re: Markup Callout C-202-00 No, they are not required M Wilson 6/30/2021 16:18 Unchecked 403 Re: Re: Markup Callout C-202-00 Has operation of pipelines been reviewed with City O&M staff? MWalkowiak 7/19/2021 10:21 Unchecked 404 Re: Re: Re: Markup Callout C-202-00 Operations of the pipelines was outlined in the BODR. City staff will have to comment on their understanding of the operation of the lines M Wilson 7/22/2021 17:48 Unchecked 407 Markup Callout C-203-00 WHAT DETAIL IS TO BE USED? SHOULD USE COMBINATION AIR RELEASE AND VACUUM VALVES, NOT ARVs. MWalkowiak 6/24/2021 8:54 Unchecked 408 Re: Markup Callout C-203-00 The specifics of the valves to be used will be provided, along with a detail for the installation, in the final design. M Wilson 6/30/2021 16:19 Unchecked 410 Markup Callout C-203-00 ARE LOW-POINT BLOWOFF/DRAIN VALVES REQUIRED? MWalkowiak 6/24/2021 8:49 Unchecked 411 Re: Markup Callout C-203-00 No, they are not required M Wilson 6/30/2021 16:21 Unchecked 412 Red Callout: New item to be added C-203-00 Are Air release needed here for storm and centrate lines? MNakamoto 7/29/2021 21:42 Checked 413 Re: Red Callout: New item to be added C-203-00 Air releases will be provided for each of the pipelines at the high points as required as part of the final design M Wilson 7/22/2021 17:49 Unchecked 414 Red Callout: New item to be added C-203-00 Is AR at this location for TRS line only? MNakamoto 7/29/2021 21:42 Checked 415 Re: Red Callout: New item to be added C-203-00 No air releases will be provided for each of the pipelines at the high points as required as part of the final design M Wilson 7/22/2021 17:50 Unchecked 417 Red Callout: New item to be added C-205-00 Do you need air release here for storm and centrate MNakamoto 7/29/2021 21:42 Checked 418 Re: Red Callout: New item to be added C-205-00 Each of the pipelines will be provided with air releases in the appropriate high points M Wilson 7/22/2021 18:15 Unchecked 421 Markup Callout C-206-00 WHAT DETAIL IS TO BE USED? SHOULD USE COMBINATION AIR RELEASE AND VACUUM VALVES, NOT ARVs. MWalkowiak 6/24/2021 8:56 Unchecked 422 Re: Markup Callout C-206-00 The specifics of the valves to be used will be provided, along with a detail for the installation, in the final design. M Wilson 6/30/2021 16:19 Unchecked 424 Markup Callout C-206-00 ARE LOW-POINT BLOWOFF/DRAIN VALVES REQUIRED? MWalkowiak 6/24/2021 8:57 Unchecked 425 Re: Markup Callout C-206-00 No, they are not required M Wilson 6/30/2021 16:21 Unchecked 426 Markup Callout C-206-00 WHAT CONSTRUCTION METHOD IS PROPOSED FOR PIPES IN THIS AREA? MWalkowiak 7/19/2021 10:23 Unchecked 427 Re: Markup Callout C-206-00 Direction drilling. See Spec section 33 05 07.13 Jonathan Keaney 6/28/2021 14:14 Unchecked 428 Red Callout: New item to be added C-206-00 Should AR here be only for TRS lines? MNakamoto 7/29/2021 21:43 Checked 429 Re: Red Callout: New item to be added C-206-00 The SW line may need one as well. Will review and update for the final design docs M Wilson 7/26/2021 7:34 Unchecked 430 Callout C-206-00 AM: SVWPC project used jack and bore to install all their utilities crossing under Zanker Road Amit Mutsuddy 7/7/2021 13:42 Unchecked 431 Re: Callout C-206-00 Noted M Wilson 7/8/2021 5:38 Unchecked 434 Markup Callout C-208-00 ARE LOW-POINT BLOWOFF/DRAIN VALVES REQUIRED? MWalkowiak 6/24/2021 9:04 Unchecked 435 Re: Markup Callout C-208-00 No, they are not required M Wilson 6/30/2021 16:21 Unchecked 437 Callout C-212-00 Kent B: Drawing displays notes 1 & 2; however, the Sheet Keynotes lists 2&3. Michael C 7/29/2021 14:37 Checked 438 Re: Callout C-212-00 Note numbering will be corrected M Wilson 7/22/2021 18:20 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 441 Markup Callout C-213-00 ARE LOW-POINT BLOWOFF/DRAIN VALVES REQUIRED? MWalkowiak 6/24/2021 9:06 Unchecked 442 Re: Markup Callout C-213-00 No, they are not required M Wilson 6/30/2021 16:22 Unchecked 443 Callout C-213-00 AM: What's the method of construction crossing Zanker Road? Amit Mutsuddy 7/7/2021 14:07 Unchecked 444 Re: Callout C-213-00 Directional drilling, refer to specification section 33.05.17.13 Horizontal Directional Drilling for details. M Wilson 7/8/2021 5:41 Unchecked 446 Cloud+ C-502-00 RC: Move valves above grade for access by O&M staff rmaidrand 6/24/2021 9:03 Unchecked 447 Re: Cloud+ C-502-00 This is understood. Piping will be brought to grade and placed on a concrete slab for accessibility M Wilson 6/30/2021 16:24 Unchecked 449 Markup Callout C-502-00 CITY REQUESTED VALVES BE INSTALLED ABOVE GROUND TO FACILITATE MAINTENANCE. MWalkowiak 7/19/2021 10:24 Unchecked 450 Re: Markup Callout C-502-00 This is understood. Piping will be brought to grade and placed on a concrete slab for accessibility M Wilson 6/30/2021 16:23 Unchecked 451 Callout C-502-00 Jose C. - what type of material is being used for pumped system? Aric 7/6/2021 15:56 Unchecked 452 Re: Callout C-502-00 Refer to sheet G-009 for piping schedule. DIP above grade, and HDPE below grade M Wilson 7/8/2021 5:14 Unchecked 454 Callout C-502-00 Jose C. - must be protected from environment. Aric 7/6/2021 15:59 Unchecked 455 Re: Callout C-502-00 Comment not understood, access hatch and vent piping will be constructed of materials suitable for the environment M Wilson 7/8/2021 5:16 Unchecked 457 Callout C-502-00 AM: Why cant we use this for sanitary sewer discharge Amit Mutsuddy 7/12/2021 9:16 Unchecked 458 Re: Callout C-502-00 As noted in the review meeting on the 13th, Storwater is an intermittent flow and Centrate was also considered however the City instructed that all sanitary flows must be upstream of the bar screens and the centrate enters the headworks downstream of the screens M Wilson 7/14/2021 9:59 Unchecked 460 Callout CD-101-85 Nora - Confirm the slope of the concrete apron in the exit area of the truck loading building is adequate for any water resulting from the usage of high pressure hoses drains toward the trench drain and/or modify the drainage accordingly. (Note: I understand exterior manual, wand type hoses were recently added in lieu of the automatic truck wheel wash system.) Aric 8/17/2021 11:32 Checked 461 Re: Callout CD-101-85 Apron on the exit of the truck bays are set up to collect any washdown water that is sprayed in that area, refer to Sheet C-101-85 for the details M Wilson 7/11/2021 10:49 Unchecked 463 Cloud+ D-101-84 Are there any provisions for expansion of piping? Aric 7/6/2021 16:21 Unchecked 464 Re: Cloud+ D-101-84 Yes, refer to specification requirements which require the use of expansion joints periodically in straight runs of piping M Wilson 7/8/2021 5:17 Unchecked 466 Markup Callout D-101-85-1 THIS MANIFOLD IS A SINGLE POINT OF FAILURE (CANNOT BE TAKEN OUT OF SERVICE). CONSIDER KEEPING SEPARATE TO ALLOW CLEANING AND INSEPCTION. MWalkowiak 6/25/2021 8:45 Unchecked 467 Re: Markup Callout D-101-85-1 Noted. Thoughts were that the entire dewatering facility could be shut down (utilizing the tanks for storage) to avoid doubling up headers. If desired by the City, a parallel header with a single valve in center of existing header can be provided to allow 1/2 the facility to be operational with the opposite side isolated. M Wilson 8/3/2021 4:38 Unchecked 469 Markup Callout D-101-85-1 MISSING ISOLATION VALVE? MWalkowiak 6/25/2021 8:52 Unchecked 470 Re: Markup Callout D-101-85-1 Valve will be added to the mech sheet to match P&ID. ove51156 7/21/2021 18:06 Unchecked 471 Markup Callout D-101-85-1 NEED FLUSHING/STRUVITE CLEANING CONNECTION POINTS MWalkowiak 6/25/2021 8:55 Unchecked 472 Re: Markup Callout D-101-85-1 Multiple flushing locations have been provided. Will consider if additional are required. Jonathan Keaney 8/2/2021 8:35 Unchecked 473 Re: Markup Callout D-101-85-1 Noted. They are shown on the P&ID's and will be added to the physical drawings prior to the finalization of the design M Wilson 8/2/2021 9:51 Unchecked 474 Red Callout: New item to be added D-101-85-1 What is the function of these 3 tees? MNakamoto 6/25/2021 13:11 Unchecked 475 Re: Red Callout: New item to be added D-101-85-1 2 of them are tees rather than elbows to allow for flashing connections. The third is a connection for a future pump. ove51156 7/21/2021 18:07 Unchecked 476 Re: Re: Red Callout: New item to be added D-101-85-1 to save cost, reduce to 1 flushing connection and make the feed pipe header straight. move feed pipeline close to pump to further save on piping. MNakamoto 7/29/2021 21:53 Unchecked 477 Re: Re: Re: Red Callout: New item to be added D-101-85-1 This is fine, will be revised in final design M Wilson 8/3/2021 17:27 Unchecked 478 Callout D-101-85-1 Why is this not in line with the existing header? Do we expect the future additions to not line up. Tim Lewis 7/29/2021 10:24 Unchecked 479 Re: Callout D-101-85-1 The piping is offset for the future units to allow for clean-outs to be inserted into the headers M Wilson 8/2/2021 9:04 Unchecked 481 Re: Length Measurement D-101-85-1 No comment necessary M Wilson 8/2/2021 9:05 Unchecked 483 Re: Length Measurement D-101-85-1 No comment necessary M Wilson 8/2/2021 9:05 Unchecked 489 Callout D-101-85-1 add valve Jonathan Keaney 8/23/2021 10:06 Unchecked 490 Callout D-101-85-1 Replace 90 with tee. Jonathan Keaney 8/23/2021 10:10 Unchecked 497 Cloud+ D-102-84 Jose C. - Show the meaning of this number directly on the drawings. Typ. Aric 7/6/2021 16:25 Unchecked 498 Re: Cloud+ D-102-84 This is a valve number and ties back to the P&ID's. Refer to the P&ID Legend for definition of the numbering system M Wilson 7/8/2021 5:19 Unchecked 501 Markup Callout D-102-85-1 CENTRATE PIPES SHOULD BE KEPT SEPARATE TO AVOID SINGLE POINT OF FAILURE. THIS CONFIGURATION DOES NOT ALLOW THIS COMMON PIPE TO BE TAKEN OUT OF SERVICE FOR CLEANING. MWalkowiak 6/25/2021 9:07 Unchecked 502 Re: Markup Callout D-102-85-1 This would add more valves to the system increasing costs, or the existing header valves would be used for additional isolation at the wetwells and additional penetrations to the wetwells would be required. As configured, each of the headers from the centrifuge rows can be isolated for cleaning with the opposite side operational. The short section of single piping can be cleaned by utilizing the M Wilson 6/29/2021 6:28 Unchecked DS st 503 Re: Re: Markup Callout D-102-85-1 Seems that keeping pipes separate can be made at minimal cost. MWalkowiak 7/19/2021 11:29 Unchecked 504 Re: Re: Re: Markup Callout D-102-85-1 Yes, but both lines need to feed to each wetwell half for isolation, therefore added valves would be needed. Ok to add if City is ok with added costs associated with their addition to the project M Wilson 7/22/2021 19:08 Unchecked 505 Markup Callout D-102-85-1 ACTUATORS ON CHUTE GATES DEPICTED WITH MOTORIZED ACTUATORS, BUT P&IDS INDICATED THEY ARE MANUAL, TYP. CLARIFY. MWalkowiak 7/19/2021 11:30 Unchecked 506 Re: Markup Callout D-102-85-1 These are manual gates. ove51156 7/21/2021 18:07 Unchecked 507 Callout D-102-85-1 Where are the connections (BF's?) into the future odor treatment facility located to the East? the Note 4 location would be difficult to route piping to the East? bpetrik 7/15/2021 10:31 Unchecked 508 Re: Callout D-102-85-1 It is shown on the side of the stack as it transitions to the roof of the facility. M Wilson 8/2/2021 11:10 Unchecked 510 Cloud+ D-103-85-1 RC: How would you access these gear boxes to perform maintenance? From a safety standpoint, access would be needed. rmaidrand 6/24/2021 10:04 Unchecked 511 Re: Cloud+ D-103-85-1 As discussed in the Technical Meeting with City/OA staff on 3/18/21, the motors and gearboxes can be accessed from one side on the interior walkway, and from the other side with a personnel hoist that can be positioned directly against the side of the conveyor from either side. This was agreed to as an acceptable means for accessing these items. Revisised Response based on City feedback - MaintM Wilson 7/22/2021 19:10 Unchecked 513 Markup Callout D-104-84 ARE FLOOR DRAINS FOR SEAL WATER AND WASHDOWN TO BE ADDED? MWalkowiak 6/25/2021 8:04 Unchecked 514 Re: Markup Callout D-104-84 Floor drains for collection of seal water will be added for the collection of seal water M Wilson 7/20/2021 10:57 Unchecked 515 Markup Text D-104-84 ARE HOSE BIBS TO BE INCLUDED? MWalkowiak 6/25/2021 8:07 Unchecked 516 Re: Markup Text D-104-84 Washdown water sources for adjacent areas will be reviewed and if no connection point is within the area, a washdown connection point will be provided. M Wilson 7/20/2021 10:58 Unchecked 517 Markup Callout D-104-84 ARE SEAL FLUSHING SYSTEMS TO BE ADDED? MWalkowiak 6/25/2021 8:08 Unchecked 518 Re: Markup Callout D-104-84 Seal flushing systems are shown on the P&ID's and in the Specifications. Physical location of the seal systems would be shown as part of the final design. M Wilson 7/20/2021 10:54 Unchecked 519 Cloud+ D-104-84 I think this was supposed to be a "tee" at 17.7' and an "elbow" at 24.36' Bryan O&M 7/6/2021 15:17 Unchecked 520 Re: Cloud+ D-104-84 Will review is a TEE should be placed at the header level to allow for the flushing connection M Wilson 7/22/2021 18:29 Unchecked 521 Callout D-104-84 Where are drains? for piump seals? bpetrik 8/5/2021 8:36 Checked 522 Re: Callout D-104-84 If double mechanical seals are provided, drains will be provided. Area drainage will utilize existing drainage systems in the area M Wilson 8/2/2021 11:08 Unchecked 524 Cloud+ D-104-85-2 NC: Please provide a hose bib outside to wash area outside if needed rmaidrand 6/24/2021 10:09 Unchecked 525 Re: Cloud+ D-104-85-2 As discussed in the 6/25/21 Management Meeting hose connections for exterior hoses will be provided at the exit area for each truck bay to avoid hosing traversing across the exit lanes. M Wilson 6/29/2021 6:36 Unchecked 528 Markup Callout D-105-84 SINGLE POINT OF FAILURE HERE WHERE DS PIPES COMBINE INTO ONE. CONSIDERING KEEPING PIPES SEPARATE TO EACH TANK AND PROVIDING CROSSOVER PIPING/VALVES. MWalkowiak 6/24/2021 11:07 Unchecked 529 Re: Markup Callout D-105-84 Agree, a minor adjustment to the piping configuration will be provided that will eliminate the single line between the two tank feeds M Wilson 7/20/2021 10:59 Unchecked 531 Cloud+ D-105-85-2 RC: What sort of surface is the top of the hoppers. rmaidrand 6/24/2021 9:37 Unchecked 532 Re: Cloud+ D-105-85-2 type of coating will be called out on drawings to ensure acceptable to City for slip protection. Jonathan Keaney 6/25/2021 9:26 Unchecked 533 Re: Re: Cloud+ D-105-85-2 Correction to response provided, the specifics of the coating system will be included in the specifications for the equipment, not called out on the drawings. M Wilson 7/22/2021 19:11 Unchecked 536 Cloud+ D-106-84 MW: Provide full redundancy rmaidrand 6/24/2021 10:31 Unchecked 542 Markup Callout D-106-84 TO AVOID SINGLE POINT OF FAILURE, CONSIDER MOVING THIS ASSEMBLY ABOVE GROUND TO LOCATION INDICATED. DOING SO WOULD IMPROVE REDUNDANCY AND REDUCE COST BY AVODING ABOVE GROUND PIPING IN THIS AREA. MWalkowiak 6/24/2021 10:57 Unchecked 543 Re: Markup Callout D-106-84 Will look at this arrangement suggested. The bypass and meter run is currently above grade and relocating it to the opposite side may also eliminate some piping materials. M Wilson 7/20/2021 11:01 Unchecked 544 Markup Callout D-106-84 ALL FLOW MUST GO THROUGH THIS PIPE AS CONFIGURED. BETTER TO PROVIDE REDUNDANT PIPE AS INDICATED. MWalkowiak 6/24/2021 10:50 Unchecked 545 Re: Markup Callout D-106-84 Will review and adjust accordingly along with the relocation of the piping to the opposite side. M Wilson 7/20/2021 11:02 Unchecked 547 Markup Callout D-106-84 SEE COMMENTS ON DESIGN CRITERIA REGARDING REDUCED AVAILALBE STORAGE VOLUME DUE TO THIS CONFIGURATION (ABOVE GROUND PUMPS WITH HIGH NPSH REQUIREMENT). CONSIDER PUMPS WITH LOWER NPSH REQUIREMENTS AND/OR INSTALLING PUMPS IN A PIT. MWalkowiak 6/24/2021 10:59 Unchecked 548 Re: Markup Callout D-106-84 Refer to the response to this item on the Hydraulic Profile sheet. M Wilson 7/20/2021 11:10 Unchecked 550 Markup Callout D-106-84 NEED VALVE HERE. MWalkowiak 6/24/2021 10:54 Unchecked 551 Re: Markup Callout D-106-84 Will review along with moving the piping to the opposite side. If a valve is needed at this point with the revised piping arrangement, it will be shown M Wilson 7/20/2021 11:06 Unchecked 553 Markup Callout D-106-84 IS THIS PIPE NEEDED? IF RETAINED, ADD VALVE. MWalkowiak 6/25/2021 8:11 Unchecked 554 Re: Markup Callout D-106-84 Will review and adjust accordingly along with the relocation of the piping to the opposite side. M Wilson 7/20/2021 11:01 Unchecked 555 Markup Callout D-106-84 PARALLEL MANIFOLD WITH FLOW METER MWalkowiak 6/24/2021 11:02 Unchecked 556 Re: Markup Callout D-106-84 Noted, as noted for the other comments on the flow meter run, will look into possibly adjusting the the piping as suggested M Wilson 7/20/2021 11:04 Unchecked 558 Markup Callout D-106-84 ARE FLOOR DRAINS FOR SEAL WATER AND WASHDOWN TO BE ADDED? MWalkowiak 6/25/2021 8:05 Unchecked 559 Re: Markup Callout D-106-84 Drain systems for collection of seal water and drainage on the equipment pad area will be added for this area. M Wilson 7/20/2021 11:18 Unchecked 560 Markup Text D-106-84 ARE HOSE BIBS TO BE INCLUDED? MWalkowiak 6/25/2021 8:06 Unchecked 561 Re: Markup Text D-106-84 A hose connection point will be provided for washdown of the equipment pad area M Wilson 7/20/2021 11:19 Unchecked 562 Markup Text D-106-84 ARE SEAL FLUSHING SYTEMS TO BE ADDED? MWalkowiak 6/25/2021 8:08 Unchecked 563 Re: Markup Text D-106-84 Seal flushing systems are shown on the P&ID's and in the Specifications. Physical location of the seal systems would be shown as part of the final design. M Wilson 7/20/2021 11:17 Unchecked 564 Markup Text D-106-84 CONSIDER ADDING EQUIPMENT CONNECTION FITTINGS OR DISMANTLING JOINTS A EACH PUMP SUCTION AND DISCHARGE. MWalkowiak 6/25/2021 8:10 Unchecked 565 Re: Markup Text D-106-84 Agree, a dismantling joint or similar connection will be provided to allow for flexibility to and from the pumps M Wilson 7/20/2021 11:16 Unchecked 568 Markup Callout D-106-84 SINGLE POINT OF FAILURE IN PUMP SUCTION LINE. MWalkowiak 6/28/2021 9:23 Unchecked 569 Re: Markup Callout D-106-84 Connection point from Tank 2 to the header can be moved to allow direct connection to the pump suction header independent of this connection point, eliminating the SPOF issue M Wilson 7/20/2021 11:21 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 570 Callout D-106-84 Where are drains? for piump seals? bpetrik 8/5/2021 8:36 Checked 571 Re: Callout D-106-84 If double mechanical seals are provided, drains will be provided. Area drainage will utilize existing drainage systems in the area M Wilson 8/2/2021 11:09 Unchecked 573 Callout D-202-84 Do these valves have maual operators on them? How are they actuated? Can they be operated from the ground or do we need a lift to get to them? Eric.Hovland 7/29/2021 13:42 Checked 574 Re: Callout D-202-84 Elevated valves will be provided with chainwheel operators. Refer to the valve schedule which calls out the valves to be provided with chainwheel actuators M Wilson 7/22/2021 18:32 Unchecked 579 Callout D-203-84 Do these valves have maual operators on them? How are they actuated? Can they be operated from the ground or do we need a lift to get to them? Eric.Hovland 7/29/2021 13:42 Checked 580 Re: Callout D-203-84 Elevated valves will be provided with chainwheel operators. Refer to the valve schedule which calls out the valves to be provided with chainwheel actuators M Wilson 7/22/2021 18:33 Unchecked 587 Markup Callout D-301-84 SECTION DUPLICATED ON NEXT PAGE MWalkowiak 7/19/2021 10:30 Unchecked 588 Re: Markup Callout D-301-84 Even though the other section shows much of the same info, it's cut from a different point within the tunnel and shows additional info that is useful. M Wilson 7/11/2021 16:17 Unchecked 589 Cloud+ D-301-84 This is a very close fit. Was this design based on field measurements or old pipe schematics? Bryan O&M 7/6/2021 14:15 Unchecked 590 Re: Cloud+ D-301-84 Agree, will work with installer to ensure as much clearance as possible can be provided M Wilson 7/22/2021 18:34 Unchecked 591 Cloud+ D-301-84 Same as below. Field verified or old schematics? Bryan O&M 7/6/2021 14:17 Unchecked 592 Re: Cloud+ D-301-84 Based on point cloud model data provided by the City to the DB team M Wilson 7/22/2021 18:35 Unchecked 593 Callout D-301-84 Wye instead of a tee Bryan O&M 7/6/2021 14:25 Unchecked 594 Re: Callout D-301-84 Tee provides the best fit up, wye requires additional fittings for little gain. Suggest retaining as a Tee. M Wilson 7/22/2021 18:36 Unchecked 595 Callout D-301-84 Possibly replace this with a wye, may be difficult to locate fitting Bryan O&M 7/6/2021 14:27 Unchecked 596 Re: Callout D-301-84 With flow splitting in both directions, a wye will favor one over the other and will make hydraulics difficult M Wilson 7/22/2021 18:38 Unchecked 600 Re: Angle Measurement D-301-85-1 No comment, just confirmation of angle M Wilson 7/8/2021 4:26 Unchecked 601 Markup Callout D-301-85-1 HAS LOSS IN CONVEYOR CAPACITY/EFFICIENCY BEEN CONSIDERED FOR STEEP SECTIONS? MWalkowiak 7/19/2021 11:30 Unchecked 602 Re: Markup Callout D-301-85-1 yes, the capacity of the conveyors takes into account the incline M Wilson 6/29/2021 6:37 Unchecked 603 Markup Callout D-301-85-1 ADD EQUIPMENT CONNECTION FITTINGS OR DISMANING JOINTS ON PUMP SUCTION AND DISCHARGE PIPING, TYP MWalkowiak 6/25/2021 9:56 Unchecked 604 Re: Markup Callout D-301-85-1 Agree a dismantling joint or similar will be provided for flexibility and fit up M Wilson 7/22/2021 19:14 Unchecked 606 Markup Callout D-301-85-1 ACCESS IN THIS AREA APPEARS TO BE OBSTRUCTED. EVEN IF PIPES ARE MOVED UP TO UNDERSIDE OF PLATFORM, HEAD CLEARANCE MAY BE INSUFFICIENT. MWalkowiak 6/25/2021 10:07 Unchecked 607 Re: Markup Callout D-301-85-1 Access will be provided for accessing cake sample points, conveyor drives and other items as required for maintenance of the equipment. M Wilson 7/8/2021 4:27 Unchecked 609 Callout D-301-85-1 Isolation available for flow meter removal? Eric.Hovland 7/15/2021 7:49 Unchecked 610 Re: Callout D-301-85-1 Line is dedicated to the centrifuge beyond meter and can be isolated upstream and flushed for meter removal. Refer to P&IDs for details M Wilson 7/22/2021 19:18 Unchecked 611 Callout D-301-85-1 Valve operation from ground level? Eric.Hovland 7/29/2021 13:46 Checked 612 Re: Callout D-301-85-1 Yes, refer to the valve schedule for operator type which is identified as chain wheel M Wilson 7/22/2021 19:13 Unchecked 616 Markup Callout D-302-84 WHAT IS TH E PURPOSE OF THIS RISER? DESIGN CRITERIA DO NOT INCLUDE ANY FUTURE PUMPS. MWalkowiak 7/19/2021 10:38 Unchecked 617 Re: Markup Callout D-302-84 Riser specifically requested by O&M staff to facilitate cleaning of suction piping for digesters 15 and 16. Jonathan Keaney 6/25/2021 9:08 Unchecked 620 Markup Callout D-302-84 CONSIDER ADDING EQUIPMENT CONNECTION FITTINGS OR DISMANTLING JOINTS MWalkowiak 7/19/2021 11:25 Unchecked 621 Re: Markup Callout D-302-84 Noted, means for disconnecting piping from the equipment will be provided M Wilson 7/11/2021 16:20 Unchecked 622 Markup Callout D-302-84 ADD A CARV AT HIGH POINT IN EACH PIPE MWalkowiak 7/19/2021 11:25 Unchecked 623 Re: Markup Callout D-302-84 Noted, these types of details will be added for the final design M Wilson 7/11/2021 16:20 Unchecked 626 Markup Callout D-302-84 ADD DRAIN TAPS/STRUVITE CHEMICAL CONNECTION POINTS MWalkowiak 6/25/2021 8:00 Unchecked 627 Re: Markup Callout D-302-84 Refer to the P&ID's for the flushing connections. Will be added to the D sheets for final submittal. M Wilson 7/22/2021 18:40 Unchecked 628 Markup Callout D-302-84 ADD DRAIN/FLUSHING POINT, TYP MWalkowiak 6/25/2021 8:15 Unchecked 629 Re: Markup Callout D-302-84 Refer to the P&ID's for the flushing connections M Wilson 7/22/2021 18:40 Unchecked 630 Callout D-302-84 Chain operated? Bryan O&M 7/6/2021 15:37 Unchecked 631 Re: Callout D-302-84 Yes, manually operated valves that are elevated will be provided with chain wheel operators M Wilson 7/22/2021 18:47 Unchecked 632 Cloud+ D-302-84 Jose C - What provisions have been made exposed piping? Typ. Aric 7/6/2021 16:28 Unchecked 633 Re: Cloud+ D-302-84 Assume this comment is referring to protection of the exposed piping. Refer to specification section 09 96 11 for protective coatings to be used on the piping systems. All piping will be coated for corrosion protection M Wilson 7/11/2021 15:32 Unchecked 634 Callout D-302-84 If not chain operated, does it have a way to be operated remotely? If operated remotely does it also have a manual operator? Eric.Hovland 7/29/2021 13:43 Checked 635 Re: Callout D-302-84 Valve is manual and would be operated via a chain wheel operator M Wilson 7/22/2021 18:47 Unchecked 638 Markup Callout D-302-85-1 ARE THESE LIGHTING FIXTURES? HOW ARE THEY ACCESSED? MWalkowiak 7/19/2021 11:33 Unchecked 639 Re: Markup Callout D-302-85-1 Access to the light fixtures is via the bridge crane. Refer to the crane specification for specifics on the service platform included with bridge M Wilson 7/8/2021 4:28 Unchecked 640 Cloud+ D-302-85-1 How is valve operation form ground level accomplished? Eric.Hovland 7/29/2021 13:46 Checked 641 Re: Cloud+ D-302-85-1 Refer to the valve schedules for valve operators, chain wheels will be provided for elevated vavles M Wilson 7/22/2021 19:20 Unchecked 642 Cloud+ D-302-85-1 Is there isolation for Flow Meters in case of removal? Eric.Hovland 7/15/2021 7:53 Unchecked 643 Re: Cloud+ D-302-85-1 Line is dedicated to the centrifuge beyond meter and can be isolated upstream and flushed for meter removal. Refer to P&IDs for details M Wilson 7/22/2021 19:21 Unchecked 645 Cloud+ D-303-85-1 SP: Do we have space for future centrate pump? Or these three are enough for future when we have 5 or 6 centrifuges? rmaidrand 6/24/2021 9:16 Unchecked 646 Re: Cloud+ D-303-85-1 Space is available for a fourth pump should it be necessary, pumps have the capability to address flows through 2052 and can either be upsized or an additional pump added for flows beyond that M Wilson 7/22/2021 19:23 Unchecked 647 Markup Callout D-303-85-1 ADD CARVs AT HIGH POINTS MWalkowiak 7/19/2021 11:37 Unchecked 648 Re: Markup Callout D-303-85-1 These details will be added between 60 and 100% design M Wilson 7/8/2021 4:29 Unchecked 649 Markup Callout D-303-85-1 ADD EQUIPMENT CONNECTION FITTINGS OR DISMANTLING JOINTS, TYP MWalkowiak 7/19/2021 11:37 Unchecked 650 Re: Markup Callout D-303-85-1 Noted, appropriate connection joints will be added to allow for removal and fit up. M Wilson 7/8/2021 4:30 Unchecked 651 Cloud+ D-303-85-1 Jose C. - How is this being secured? Aric 7/6/2021 16:30 Unchecked 652 Re: Cloud+ D-303-85-1 Piping will be secured to the building, pipe supports to be shown in the Final Design M Wilson 7/8/2021 5:25 Unchecked 653 Callout D-303-85-1 Can this be operated from the ground level? Eric.Hovland 7/29/2021 13:48 Checked 654 Re: Callout D-303-85-1 yes, refer to the valve schedules for valves to be provided with chain wheels, chain wheel operators will be provided for elevated valves M Wilson 7/22/2021 19:25 Unchecked 656 Markup Callout D-304-84 ADD CARV AT HIGH POINT IN EACH PIPE MWalkowiak 6/25/2021 8:21 Unchecked 657 Re: Markup Callout D-304-84 Understood, air/vacuum relief valves will be added to high points and shown for the final design M Wilson 7/22/2021 18:49 Unchecked 660 Re: Length Measurement D-304-85-1 No response necessary M Wilson 7/22/2021 18:49 Unchecked 662 Cloud+ D-304-85-1 No Flow meters for polymer? Eric.Hovland 7/15/2021 8:05 Unchecked 663 Re: Cloud+ D-304-85-1 PC polymer pump will convert speed to a flow rate. Water side does have a flow meter and is automatically adjusted on the skid to make desired polymer concentration. ove51156 7/21/2021 12:24 Unchecked 667 Re: Angle Measurement D-305-85-2 No comment, just confirmation of angle M Wilson 7/8/2021 4:30 Unchecked 668 Cloud+ D-305-85-2 Jose C. - any seismic straps? Show strapping details Aric 7/6/2021 16:31 Unchecked 669 Re: Cloud+ D-305-85-2 Piping will be strapped to the pipe supports. Pipe supports, and their details will be shown in the Final Design M Wilson 7/8/2021 5:26 Unchecked 670 Cloud+ D-305-85-2 Is training, calibration equipment, and test equipment included in project for truck scales? Weights, software, test equipment needed? Eric.Hovland 7/15/2021 8:11 Unchecked 671 Re: Cloud+ D-305-85-2 No this would outside of the scope of the project. Calibration of the scale after installation to be performed by a State Certified calibration firm M Wilson 8/18/2021 11:40 Unchecked 673 Markup Callout D-307-84 CONSIDER SEPARATE PIPES TO EACH TANK WITH CROSSOVER PIPING/VALVING TO AVOID SINGLE POINT OF FAILURE AND RETAIN CAPABILITY TO REMOVE STRUVITE WITHOUT COMPLETE PROCESS SHUTDOWN. MWalkowiak 6/25/2021 8:24 Unchecked 674 Re: Markup Callout D-307-84 Agree with this comment. Piping as it leaves the support to the tanks will be split to allow either tank to be fed, or when one is out of service the entire line up to the isolation valve can be cleaned/flushed. M Wilson 8/2/2021 9:50 Unchecked 675 Callout D-307-84 Chain valve? Bryan O&M 7/6/2021 16:04 Unchecked 676 Re: Callout D-307-84 Refer to the specifications for valves identified as needing chain wheels. In general any valve that is elevated will have a chain wheel operator M Wilson 8/2/2021 11:06 Unchecked 677 Callout D-307-84 Chain Valve? Bryan O&M 7/6/2021 16:06 Unchecked 678 Re: Callout D-307-84 Refer to the specifications for valves identified as needing chain wheels. In general any valve that is elevated will have a chain wheel operator M Wilson 8/2/2021 11:06 Unchecked 679 Callout D-307-84 Remote operation? Eric.Hovland 7/29/2021 13:43 Checked 680 Re: Callout D-307-84 Elevated valves will be provided with chainwheel operators. Jonathan Keaney 7/25/2021 18:27 Unchecked 682 Callout D-308-84 Remote operable from the ground? If this is in between the tanks how do we get up there for operation, maintenance or repair? Eric.Hovland 7/29/2021 13:43 Checked 683 Re: Callout D-308-84 Elevated valves will be provided with chainwheel operators. Jonathan Keaney 7/25/2021 18:27 Unchecked 684 Callout D-308-84 Does this model of PRV have sensors on it to indicate when the lids have lifted and flow is coming out? This is a new requirement for us from the air board. Eric.Hovland 7/29/2021 13:43 Checked 685 Re: Callout D-308-84 Valve will be provided with ability to indicate when valve is operating/activated. Jonathan Keaney 7/25/2021 18:26 Unchecked 688 Callout D-309-84 Can these valves be operated from the ground in any way? Eric.Hovland 7/29/2021 13:43 Checked 689 Re: Callout D-309-84 Elevated valves will be provided with chainwheel operators. Jonathan Keaney 7/25/2021 18:24 Unchecked 703 Cloud+ D-401-85-1 Is there any kind of pressure reading for the pumps? Eric.Hovland 7/15/2021 8:31 Unchecked 704 Re: Cloud+ D-401-85-1 Refer to the P&ID's for this information. M Wilson 7/22/2021 18:53 Unchecked 711 Markup Callout D-402-85-1 CONSIDER SWAPPING LOCATIONS OF STAIRS AND FILL STATION. IN CURRENT LOCATION, STAIRS ARE IN CONFLICT WITH TRUCK ACCESS. ALSO, TRUCK FILL CONNECTIONS ARE BETTER LOCATED ADJACENT TO TRUCK. MWalkowiak 6/25/2021 11:14 Unchecked 712 Re: Markup Callout D-402-85-1 Trucks will park on the south so it will be adjacent to connections. Suggest no change. ove51156 7/21/2021 12:26 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 713 Callout D-402-85-1 Jose C. - What types of chemicals are in this? Aric 7/6/2021 16:55 Unchecked 714 Re: Callout D-402-85-1 Polymer M Wilson 7/8/2021 5:27 Unchecked 715 Text Box D-402-85-1 Issayas L. : The Velodyne blending equipment BV/Walsh selected has no 2-stage polymer mixing chamber. On the other hand, the UGSI blending unit has both 1-stage and 2-stage mixing in its mixing chamber. Cost-wise, UGSI is slightly expensive (less than 6%) than Velodyne. But studies conducted by David Oerke, Jacobs indicated that 2-stage mixing can increases the polymer activation by up to 22% th Michael C 7/8/2021 15:21 Unchecked ereb 716 Re: Text Box D-402-85-1 Velodyne technically uses three stages of mixing and UGSI uses two stages of mixing. One manufacturer utilizes two mechanical mixing steps and the other uses a hydro-dynamic and hydro-mechanical mixing steps. ove51156 7/21/2021 12:29 Unchecked 717 Text Box D-402-85-1 Issayas L. : The other design deficiency was the secondary/post dilution capability eliminated along with the aging tank. Post-dilution capability was not there in the BV’s initial design proposal until after we conviced BV's polymer expert (Erin Briggeman) at the March 2021 technical coordination meeting. As confirmed by practitioners (Ref. Bauer, et al.—Understanding Polymer for Thickener and D Michael C 7/8/2021 15:23 Unchecked ewatering 718 Re: Text Box D-402-85-1 continuous secondary dilution is provided along with a flushing connection as requested by operations in the 60% design phase. Refer to P&ID drawings for confirmation. ove51156 7/21/2021 12:37 Unchecked 719 Cloud+ D-402-85-1 No Flow or pressure meters in system? Instrumentation needs to be added. Eric.Hovland 7/15/2021 8:38 Unchecked 720 Re: Cloud+ D-402-85-1 A water flowmeter is provided on the skid. Polymer is paced off the pump speed. Polymer activation chamber has an internal pressure switch. ove51156 7/23/2021 6:41 Unchecked 722 Cloud+ D-501-84 Jose C. - Where's this discharging to? Aric 7/6/2021 16:29 Unchecked 723 Re: Cloud+ D-501-84 Drains in this area will be shown in the Final Design M Wilson 7/8/2021 5:22 Unchecked 724 Callout D-501-84 How high off the ground is this? can it be operated remotely from the ground? Does it have a manual operator on it? It looks buried in pipes, can we get to it for operation, repair, maintenance? Eric.Hovland 7/29/2021 13:44 Checked 725 Re: Callout D-501-84 Assembly will be placed as close to grade as possible, approx 6-8 ft above grade. Valves will be placed at 3-4 ft above grade for access M Wilson 7/22/2021 19:03 Unchecked 726 Callout D-501-84 Element? Is this a Level indicator, level gauge, or a level transmitter? Can this be seen from the ground? Eric.Hovland 7/15/2021 7:32 Unchecked 727 Re: Callout D-501-84 Level switch for control of the water flow into the trap assembly M Wilson 7/22/2021 19:04 Unchecked 728 Re: Re: Callout D-501-84 Can it be seen from the ground? Eric.Hovland 8/19/2021 11:38 Checked 729 Re: Re: Re: Callout D-501-84 Yes, this will be low enough to be readable from the ground M Wilson 8/3/2021 17:26 Unchecked 730 Callout D-501-84 Sheet reference for detail of what drawing ? Eric.Hovland 7/15/2021 7:36 Unchecked 731 Re: Callout D-501-84 Additional details will be added to the drawing, and the reference to the to the details will be on the plans/sections M Wilson 7/22/2021 19:05 Unchecked 733 Callout D-901-85 Nora - Confirm the length of the truck loadout building and its scales are adequate. Based on the second section/perspective, it appears as though a truck's cabin cannot pull forward so that a container is below cake storage bin 1 without impeding the closure of the exit rollup door. Aric 8/17/2021 11:35 Checked 734 Re: Callout D-901-85 The length of the truck bay is adequate for loading a truck from either bin within each bay. The only model of a truck that we have is for one with an oversized tractor with full sleeper which is not true to what would be used M Wilson 7/11/2021 15:34 Unchecked 736 Callout E-001-00 Marc N.: Confirm that lighting fixtures used are consistent with other recent projects relative to requirement for "marine grade" lighting fixtures per guidance provided previously in response to RFI. rmaidrand 7/7/2021 8:25 Unchecked 737 Re: Callout E-001-00 Lighting design will be revised per RFI response. pro51085 7/9/2021 9:42 Unchecked 740 Markup Callout E-101-85-1 SHOULD BLAST WALL BE PROVIDED BETWEEN XFMRS? MWalkowiak 7/19/2021 11:49 Unchecked 741 Re: Markup Callout E-101-85-1 The intent is to separate transformers sufficiently so that a wall is not required. pro51085 7/13/2021 4:59 Unchecked 743 Callout E-103-84 Would a rooftop AC unit with heat be more efficient and take up less space than separate heater and AC units? Sbarker 7/16/2021 7:58 Checked 744 Re: Callout E-103-84 Rooftop units would be difficult considering pre-engineered building construction and access requirements for maintenance/fall protection. This will be discussed internally during next design phase to verify. Unit heaters will be removed from design to be consistent with Dewatering Building Electrical Room comments. can33158 7/9/2021 11:13 Unchecked 746 Callout E-104-85-1 I would prefer not to have occupancy sensors in process areas. Some work in these areas requires working on energized equipment or running machinery and it would be a safety hazard to have the lights turn off while doing this work. Sbarker 7/16/2021 7:58 Checked 747 Re: Callout E-104-85-1 Occupancy sensor are required by Title 24. Per review meeting on 7-13-2021, City to request variance. pro51085 7/14/2021 10:51 Unchecked 749 Callout E-105-84 If PRV model has flow sensors there would need to be another conduit path for that. Eric.Hovland 7/29/2021 13:59 Checked 750 Re: Callout E-105-84 Will provide means for signal to indicated PRV activation including necessary conduit. Jonathan Keaney 7/25/2021 18:23 Unchecked 751 Re: Re: Callout E-105-84 Could we add the conduit to the drawing? Eric.Hovland 7/29/2021 13:59 Unchecked 752 Re: Re: Re: Callout E-105-84 The necessary conduit and wiring to the switch will be shown in the final design M Wilson 8/3/2021 17:32 Unchecked 755 Callout E-105-85-1 Add a couple more outlets to this area Sbarker 7/16/2021 7:59 Checked 756 Re: Callout E-105-85-1 Will add more outlets. pro51085 7/13/2021 5:00 Unchecked 758 Callout E-106-84 These lights should be on a switch and a photocell to prevent them from being left on during the day Sbarker 7/16/2021 7:58 Checked 759 Re: Callout E-106-84 Per 7-13-21 meeting, wire a circuit from lighting contactor in electrical room to switch at tanks. pro51085 7/14/2021 7:44 Unchecked 761 Callout E-107-84 All 120v or externally powered instruments should have disconnect switches. Sbarker 7/16/2021 7:58 Checked 762 Re: Callout E-107-84 Will revise as noted. pro51085 7/12/2021 14:38 Unchecked 764 Cloud+ E-401-85-1 Is HVAC system going to be tied to fire system? Eric.Hovland 7/15/2021 13:50 Unchecked 765 Re: Cloud+ E-401-85-1 yes, this will be detailed in the HVAC system Sequence of Operations to be provided as a part of the Final Design M Wilson 8/3/2021 5:23 Unchecked 767 Callout E-406-85-1 Add switched outlet for garbage disposal Sbarker 7/16/2021 7:59 Checked 768 Re: Callout E-406-85-1 Will add switched outlet for garbage disposal. pro51085 7/13/2021 5:04 Unchecked 769 Callout E-406-85-1 Is this outlet for a stove exhaust hood? Sbarker 7/16/2021 7:59 Checked 770 Re: Callout E-406-85-1 It's for the stove. However, outlets will be reviewed during 90% design to provide all outlets required for equipment shown on architectural drawings. pro51085 7/13/2021 5:03 Unchecked 771 Callout E-406-85-1 The counter top along this wall should have more outlets Sbarker 7/16/2021 7:59 Checked 772 Re: Callout E-406-85-1 Will add more outlets. pro51085 7/13/2021 5:03 Unchecked 773 Callout E-406-85-1 what is the purpose of the outlets controlled by an occupancy sensor? Sbarker 7/16/2021 8:00 Checked 774 Re: Callout E-406-85-1 Title 24 requires occupancy sensors for receptacles in offices. We are considering this area as an "office". Please provide direction if sensors should be removed. pro51085 7/12/2021 14:45 Unchecked 775 Cloud+ E-406-85-1 Is there a listing for Ethernet outlets in work areas where there could be computers? Eric.Hovland 7/15/2021 13:59 Unchecked 776 Re: Cloud+ E-406-85-1 Ethernet outlets will be shown at the 90% submittal. pro51085 8/5/2021 13:33 Unchecked 778 Callout E-502-00 For future conduits that are not installed inside equipment or pull box, the rigid coupling and plug should be flush with the floor. Sbarker 7/16/2021 7:57 Checked 779 Re: Callout E-502-00 Coupling will be flush with the floor. pro51085 7/9/2021 9:43 Unchecked 781 Text Box E-602-00 Nelso P.: Zone A/5=7: For new M4 One-Line details, refer to attachment: M4 52-203A Info.zip. Click on folder icon below for the attachment files. If files aren't showing please let Andy W. know. AndyW 8/16/2021 10:06 Checked 782 Re: Text Box E-602-00 We were able to download the files. Thank you. pro51085 7/12/2021 14:10 Unchecked 784 Text Box E-602-00 Nelso P.: RE question about updated schematics during the 7/1/21 electrical meeting: Attached below please find: -The One-Line 4.16KV "M" Switchgear(00E0200 Rev. 1 sheets 5 & 6. -The New M4 Switchgear One-Line (This will be commissioned around 10/2021) In the next six months, other changes will be made to the One Line after the Equipment is "Commissioned". -Removal of SWGR G3 & SWGAndyW 8/16/2021 10:09 Checked 785 Re: Text Box E-602-00 Agree with recommendation. Drawings E601 and E602 will be removed and one-line diagram E603 will refer to City's latest one-line diagram 00E0200. pro51085 7/12/2021 14:12 Unchecked 789 Callout E-602-84 Disconnect switches for VFDs shall be provided with Make Before Break contact to shut d0wn the VFDs. Contact in disconnect switch shall be wire to VFDs. SPuthuveeduPalani 7/8/2021 21:01 Unchecked 790 Re: Callout E-602-84 Contact included. Refer to schematic on E-608-84. pro51085 7/12/2021 14:55 Unchecked 792 Callout E-603-00 This switchgear should be able to switch from one main breakers to the other or from the tie to a main breaker without de-energizing the switchgear. Sbarker 7/16/2021 7:57 Checked 793 Re: Callout E-603-00 Per review meeting on 7-13-2021, ATO will be removed and replaced with Hot Swap Control Scheme provided by Nelso. pro51085 7/14/2021 10:57 Unchecked 794 Text Box E-603-00 Nelso P.: In Zone D/5, change the M4 feeder to M4 52-203A. For details, refer to attachment: M4 52-203A Info.zip. Attachment is provided in E-602-00. AndyW 8/16/2021 10:06 Checked 795 Re: Text Box E-603-00 Revised breaker number to 52-203A. pro51085 7/12/2021 14:16 Unchecked 796 Text Box E-603-00 Nelso P.: The Automatic Throwover Controls (ATO) is not acceptable. All MV and LV Switchgear breakers must be CLOSED by the City's Electricians. The ATO cannot automatically close the Tie breakers. AndyW 8/16/2021 10:07 Checked 797 Re: Text Box E-603-00 Per review meeting on 7-13-2021, ATO will be removed and replaced with Hot Swap Control Scheme provided by Nelso. pro51085 7/14/2021 10:56 Unchecked 798 Text Box E-603-00 Nelso P.: "The City recommends installing the Hot Swap scheme to the 85SWGR1000 (Mains & Tie Breakers) that the City has standardized at several switchgears. The Hot Swap Scheme has the following advantages: - The transfer between the Mains & Tie Breaker is done HOT without interrupting the Dewatering Loads. - All breaker closures is done by the City's Electricians. Refer to the ""Hot Swap AndyW 8/16/2021 10:07 Checked 799 Re: Text Box E-603-00 Per review meeting on 7-13-2021, ATO will be removed and replaced with Hot Swap Control Scheme provided by Nelso. pro51085 8/5/2021 13:28 Unchecked 801 Callout E-603-00 confirm if Auto Transfer is closed transition. SPuthuveeduPalani 7/8/2021 20:40 Unchecked 802 Re: Callout E-603-00 Per review meeting on 7-13-2021, ATO will be removed and replaced with Hot Swap Control Scheme provided by Nelso. pro51085 7/14/2021 10:56 Unchecked 803 Callout E-603-00 Add HP rating for all centrifuges SPuthuveeduPalani 7/8/2021 20:52 Unchecked 804 Re: Callout E-603-00 Centrifuge has multiple motors. We can add multiple ratings to indicate each motor rating. pro51085 7/12/2021 14:22 Unchecked 806 Text Box E-605-00 Ductbank schedule shall be submitted in 90% submittal for us to check the ductbank sections. SPuthuveeduPalani 7/8/2021 20:45 Unchecked 807 Re: Text Box E-605-00 Correct. pro51085 7/9/2021 9:46 Unchecked 810 Cloud+ E-605-84 Eric H.:Can 24v dc power be used for field instruments instead of 120v rmaidrand 7/7/2021 10:13 Unchecked 811 Re: Cloud+ E-605-84 24 v can be used for a good number of the instruments, however there are some that will require 120v M Wilson 8/2/2021 9:09 Unchecked 812 Callout E-605-84 We prefer 24VDC instruments where available. Eric.Hovland 7/15/2021 11:10 Unchecked 813 Re: Callout E-605-84 Design clarification to be provided. will be priced by subcontractors to determine cost impact, if any. Jonathan Keaney 7/25/2021 18:22 Unchecked 822 Cloud+ E-606-84 Any FACP in the project needs to be capable of reporting to a master panel system. We are currently working on solidifying the brand of master panel here at the Facility through a CIP project. There is currently no Master Control Panel. We are leaning towards a FIKE master control panel and would prefer that the panels in this project were FIKE as well. Eric.Hovland 7/29/2021 13:59 Checked 823 Re: Cloud+ E-606-84 Understood, Specification 28 13 19 paragraph 2-1 specifies the communications requirements. Will work with the City on completion of the project to specify a system that is compatible. M Wilson 7/22/2021 17:13 Unchecked 825 Callout E-606-85 Is one 20amp circuit enough for 5 knife gates? Are there interlocks to prevent multiple gates from operating at once? Sbarker 7/16/2021 8:00 Checked 826 Re: Callout E-606-85 A 20 amp circuit is sufficient, however, we will review if 480 V is required instead of 120 V since these are pneumatic actuators. pro51085 7/13/2021 5:14 Unchecked 828 Callout E-612-85 add dimension of MCCs (Typical for all MCCs and switchgears. SPuthuveeduPalani 7/8/2021 21:22 Unchecked 829 Re: Callout E-612-85 Will add dimensions. pro51085 7/13/2021 5:14 Unchecked 831 Callout E-617-85 All 120vac devices should have lockable disconnect switches. Sbarker 7/16/2021 8:04 Checked 832 Re: Callout E-617-85 Disconnects will be added. pro51085 7/13/2021 5:16 Unchecked 834 Callout E-622-85 Needs motor temperature per P&ID PMurphy 7/28/2021 11:05 Checked 835 Re: Callout E-622-85 We will add motor temp status. pro51085 7/13/2021 5:17 Unchecked 837 Callout E-626-85 I do not think this is correct. Both contacts would need to be closed to start the motor. Sbarker 7/16/2021 8:05 Checked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 838 Re: Callout E-626-85 Agree. Pushbuttons will be moved to be in series with respective contactor. pro51085 7/13/2021 5:21 Unchecked 840 Callout E-626-85 What prevents both coils from energizing at the same time? Sbarker 7/16/2021 8:05 Checked 841 Re: Callout E-626-85 Forward/Reverse starter schematic will be reviewed and revised as necessary. pro51085 7/13/2021 5:19 Unchecked 842 Callout E-626-85 Disconnect for all motors shown on the single line diagrams. Please check the Note 3 and update as required.(This comment is applicable to all drawings) SPuthuveeduPalani 7/8/2021 21:29 Unchecked 843 Re: Callout E-626-85 Agree. 40hp requirement will be removed from note. pro51085 7/13/2021 5:24 Unchecked 845 Callout E-628-85 The selector switch should be a 2 position (ON-AUTO) switch Sbarker 7/16/2021 8:05 Checked 846 Re: Callout E-628-85 Will revise as noted. pro51085 7/13/2021 5:25 Unchecked 848 Text Box E-629-85 Add drawings for lighting panel schedule and power panel schedule in 90% submittal. SPuthuveeduPalani 7/8/2021 21:31 Unchecked 849 Re: Text Box E-629-85 Correct. This detail will be added for 90% submittal. pro51085 7/9/2021 9:51 Unchecked 852 Markup Callout F-101-85-1 WHAT IS THE PLAN FOR FIRE PROTECTION IN ELECTRICAL ROOM? IT IS REQUIRED BY CITY FIRE DEPT. MWalkowiak 6/28/2021 16:42 Unchecked 853 Re: Markup Callout F-101-85-1 A meeting was held with the Fire Marshal and the approach for full separation of the electrical room from the building was discussed and agreed that fire protection would not be required provided that we are fully separated, which the design provides for the required separation M Wilson 6/30/2021 13:53 Unchecked 854 Re: Re: Markup Callout F-101-85-1 Use of dry fire suppression system was discussed during design review meeting. Clarify. MWalkowiak 7/19/2021 11:48 Unchecked 855 Re: Re: Re: Markup Callout F-101-85-1 Agree, the feedback that was previously received from the FM was changed and a dry system may now be required M Wilson 7/23/2021 5:08 Unchecked 857 Markup Text F-102-85-1 HAS CITY FIRE DEPARMENT AGREED THAT FIRE PROTECTION IS NOT REQUIRED IN TRUCK LOADING BUILDING? THEY TYPICALLY REQUIRE FIRE PROTECTION IN ALL BUILDINGS. MWalkowiak 7/19/2021 11:49 Unchecked 858 Re: Markup Text F-102-85-1 Yes, a meeting was held with the Fire Marshal and the design of the facility was discussed and given that the facility is under the threshold of 6200 sf, a fire sprinkler system is not requried. M Wilson 6/30/2021 13:54 Unchecked 860 Cloud+ G-000-00 How about Dept. of Public Works Director signature? Domenic Onorato 7/13/2021 11:05 Unchecked 861 Re: Cloud+ G-000-00 Cover sheet is per City standards, if City desires a change to the cover, please provide guidance to the design team on the changes to be included M Wilson 7/27/2021 6:58 Unchecked 862 Cloud+ G-000-00 -Scope of Work Paragraph? -Deferred Submittals such as FA, FS, Underground, Generator (if any), Haz. Mat.? Submittals above are to be reviewed by DB entity and then submit to FD for approval -Project Volumes: Note identifying something similar to as such: 'This Construction contains X Volumes as described below: Volume 1: Construction drawings Volume 2: Project Specifications (Who is suplying D Domenic Onorato 7/13/2021 11:11 Unchecked iv. 0 863 Re: Cloud+ G-000-00 Defer to City project management, documents other than the design documents have been submitted. City management to determine routing for comments. Cover sheet is per the City stds provided to the design team. If City desires changes to the std, please provide them to the design team M Wilson 7/27/2021 6:57 Unchecked 865 Text Box G-004-00 No Symbol Key for the document? Eric.Hovland 7/14/2021 8:57 Unchecked 866 Re: Text Box G-004-00 Symbol key for P&ID's are provided in front of the P&ID sheets, and electrical sheets M Wilson 7/22/2021 17:16 Unchecked 869 Re: Cloud G-005-00 No reply required M Wilson 7/8/2021 5:42 Unchecked 870 Markup Callout G-005-00 A 17.0 FT MINIMUM LEVEL REDUCES THE ACTIVE VOLUME OF THE TANKS BY 30%. ALTERNATIVES SUCH AS SLOWER PUMPS THAT REQUIRE LESS NPSH AND/OR INSTALLING THE PUMPS IN A PIT SHOULD BE CONSIDERED. MWalkowiak 7/19/2021 8:29 Unchecked 871 Re: Markup Callout G-005-00 This is intended as the minimum operating level, not the absolute minimum level. With the DS Transfer pumps operating intermittently at 1000 gpm the level in the tank will fluctuate and to minimize the possibliity of dewatering system shutdown we suggest that the tank be operated at 17 ft or above. The total storage for the system takes into account the volume of the tanks. M Wilson 7/11/2021 16:06 Unchecked 872 Re: Re: Markup Callout G-005-00 Provided hydraulic calculations do not include manufacturer's pump curves or NPSHR information. Therefore, the suitability of the design cannot be confirmed. MWalkowiak 7/19/2021 8:24 Unchecked 873 Callout G-005-00 The draining condition should be shown - i.e. lower level, and when pumping stops bpetrik 6/29/2021 14:31 Unchecked 874 Re: Callout G-005-00 The Hydraulic profile shows the normal operating conditions for the system. Draining of the digesters is not specifically an operating point, but something that the pumps will have the capability to draw down the digesters M Wilson 7/15/2021 16:32 Unchecked 876 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:43 Unchecked 878 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:43 Unchecked 879 Text Box G-005-00 can the pumps handle the entire tank range? high and low? bpetrik 6/29/2021 14:33 Unchecked 880 Re: Text Box G-005-00 Yes. The use of the Average was for normal operations. Operating the tank at lower levels is ok, but not expected normally as it could lead to unscheduled shut down of the dewatering process due to low levels if sludge is not transferred on a frequent enough basis from the digesters to maintain the DS storage tank levels M Wilson 7/11/2021 16:02 Unchecked 882 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:43 Unchecked 884 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:43 Unchecked 886 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:43 Unchecked 888 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:44 Unchecked 890 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:44 Unchecked 892 Re: Line G-005-00 No reply required M Wilson 7/8/2021 5:44 Unchecked 893 Text Box G-005-00 drain level? bpetrik 8/5/2021 8:35 Checked 894 Re: Text Box G-005-00 The drin level is not a design criteria for the project. As was presented in a number of technical meetings, the Transfer pumps will have the capability to draw the digesters to a level below the existing access manways M Wilson 7/22/2021 17:21 Unchecked 896 Markup Callout G-006-00 NO WET WELL BEFORE CENTRIFUGE FEED PUMPS. MWalkowiak 7/19/2021 8:27 Unchecked 897 Re: Markup Callout G-006-00 Noted, this is not a critical item and it's not called out as a wetwell, but we can remove it M Wilson 6/30/2021 15:50 Unchecked 899 Re: Cloud G-006-00 No reply required M Wilson 7/8/2021 5:44 Unchecked 900 Markup Callout G-006-00 0.5% POLYMER SOLUTION DOES NOT APPEAR TO BE CONSISTENT WITH DECISION TO PROVIDE POST-MAKEDOWN DILUTION WATER. MWalkowiak 6/22/2021 16:40 Unchecked 901 Re: Markup Callout G-006-00 The design basis is on 0.5% polymer. As stated in the March 18 tech meeting the post dilution was added at the City's request so that they could dilute further if they chose M Wilson 6/30/2021 15:52 Unchecked 902 Re: Re: Markup Callout G-006-00 Decision to add secondary dilution was reached by group consensus during a meeting that was attended by B&V's polymer expert. The mass balance should reflect use of secondary dilution as mutually agreed. MWalkowiak 7/19/2021 8:29 Unchecked 903 Re: Re: Re: Markup Callout G-006-00 It was added as a means of providing flexibility and is included as such M Wilson 7/26/2021 7:40 Unchecked 905 Re: Cloud G-006-00 No reply required M Wilson 7/8/2021 5:44 Unchecked 906 Markup Callout G-006-00 SHOULD BE UPDATED TO REFLECT CURRENT STARTUP YEAR PER CURRENT SCHEDULE, TYP. MWalkowiak 7/19/2021 8:30 Unchecked 907 Re: Markup Callout G-006-00 As discussed in the Management Meeting on 6/25, no changes will be made to the initial year. M Wilson 6/30/2021 15:55 Unchecked 909 Re: Cloud G-006-00 No reply required M Wilson 7/8/2021 5:44 Unchecked 910 Markup Callout G-006-00 ADD ROWS FOR WET TONS PER DAY THAT ARE NEEDED FOR PLANNING CAKE STORAGE AND HAULING, TYP. MWalkowiak 6/22/2021 16:52 Unchecked 911 Re: Markup Callout G-006-00 Information is shown in wet lbs/day, no need for additional rows to convert to tons. M Wilson 6/30/2021 15:57 Unchecked 913 Re: Cloud G-006-00 No reply required M Wilson 7/8/2021 5:44 Unchecked 914 Markup Text G-006-00 ADD NOTES TO CLARIFY ASSUMPTIONS. FOR EXAMPLE: * IS FOG RECEIVING INCLUDED? * IS FECL3 ADDITION INCLUDED? * DO VALUES CONSIDER SIMULTANEOUS DRAW DOWN OF STORED DS? * OTHER? MWalkowiak 6/22/2021 16:45 Unchecked 915 Re: Markup Text G-006-00 A note can be added to clarify M Wilson 6/30/2021 15:59 Unchecked 917 Re: Cloud G-006-00 No reply required M Wilson 7/8/2021 5:45 Unchecked 919 Re: Cloud G-006-00 No reply required M Wilson 7/8/2021 5:45 Unchecked 920 Markup Callout G-006-00 NOT CLEAR HOW THIS ASSUMPTION IS CONSERVATIVE. WHY NOT USE SPECIFIC GRAVITY REPORTED BY POLYMER MANUFACTURERS? MWalkowiak 6/22/2021 16:49 Unchecked 921 Re: Markup Callout G-006-00 Assuming 8.34 results in slightly higher liquid rates which is more conservative than assuming a SG of 1.02. Not significant, but conservative. M Wilson 6/30/2021 15:56 Unchecked 922 Markup Callout G-006-00 RECENT DESIGN CRITERIA TABLE PROVIDED FOR REVIEW INDICATES THAT POLYMER SYSTEM IS DESIGN FOR UP TO 45 LBS/DT. SHOULD DESIGN CONSIDER PEAK POLYMER DOSE AT PEAK 7-DAY CONDITION? MWalkowiak 6/22/2021 16:54 Unchecked 923 Re: Markup Callout G-006-00 35 lbs/dt used as it is the Design Critera for the project. The equipment will have the capability to feed above that, but that is not the criteria that should be listed here. M Wilson 6/30/2021 15:54 Unchecked 924 Callout G-006-00 Nora - Confirm calculations/estimates are correct. The 2022 amounts for the dewatered cake from storage bins are less than what has been removed from the RWF's drying beds the past couple of years. Aric 8/17/2021 11:26 Checked 925 Re: Callout G-006-00 The numbers presented are in alignment with the projections provided to the DB team as part of the PDR. M Wilson 7/22/2021 17:19 Unchecked 926 Cloud+ G-006-00 AM: this numbers appears to be low, can we get the back ups how these numbers were calculated Amit Mutsuddy 7/12/2021 16:48 Unchecked 927 Re: Cloud+ G-006-00 The process numbers are based on the values provided to the DB team as part of the PDR, the sludge quantities were not provided by the DB team M Wilson 7/15/2021 16:12 Unchecked 930 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:45 Unchecked 931 Markup Callout G-007-00 UPDATE BASED ON CURRENT STARTUP DATE, TYP. MWalkowiak 7/19/2021 9:41 Unchecked 932 Re: Markup Callout G-007-00 As discussed in the Management Meeting on 6/25, no changes will be made to the initial year. M Wilson 6/29/2021 5:36 Unchecked 934 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:45 Unchecked 935 Markup Callout G-007-00 BASED ON MINIMUM OPERATING LEVEL SHOWN ON HYDRAULIC PROFILE (17.0 FT), THE ACTUAL USABLE VOLYUME OF 2 TANKS IS 0.97 MG. CONSIDER OPTIONS FOR INCREASING ACTIVE VOLUME SUCH AS USING PUMPS WITH LOWER NPSHR REQUIREMENT AND/OR INSTALLING PUMPS IN A BELOW GROUND PIT. MWalkowiak 6/23/2021 11:25 Unchecked 936 Re: Markup Callout G-007-00 This is intended as the minimum operating level, not the absolute minimum level. With the DS Transfer pumps operating intermittently at 1000 gpm the level in the tank will fluctuate and to minimize the possibliity of dewatering system shutdown we suggest that the tank be operated at 17 ft or above. The total storage for the system takes into account the volume of the tanks. M Wilson 7/11/2021 16:07 Unchecked 937 Re: Re: Markup Callout G-007-00 Submitted hydraulic calculations do not include NPSHR information from the pump manufacturer, so the adequacy of the design cannot be reviewed. MWalkowiak 7/19/2021 9:43 Unchecked 939 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:45 Unchecked 940 Markup Callout G-007-00 DOES THE DS STORAGE MIXING SYSTEM ALSO INCLUDE JET NOZZLES? MWalkowiak 6/23/2021 11:25 Unchecked 941 Re: Markup Callout G-007-00 Yes, refer to the system specification 46 41 21 M Wilson 6/29/2021 5:31 Unchecked 942 Re: Re: Markup Callout G-007-00 Information should be added to table. MWalkowiak 7/19/2021 9:44 Unchecked 943 Re: Re: Re: Markup Callout G-007-00 Will add the system has two nozzles per tank M Wilson 8/3/2021 17:14 Unchecked 945 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:52 Unchecked 946 Markup Callout G-007-00 PROVIDE FOOTNOTE ASSOCITIATED WITH ASTERISK. MWalkowiak 6/23/2021 11:06 Unchecked 947 Re: Markup Callout G-007-00 Asterisk can be deleted M Wilson 6/29/2021 5:31 Unchecked 949 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:52 Unchecked 950 Markup Callout G-007-00 CLARIFY THAT PUMPS ARE SIZED BASED ON 2.3% TS SLUDGE. MWalkowiak 7/19/2021 9:45 Unchecked 951 Re: Markup Callout G-007-00 Refer to specifications for the pumps for specifics such as this. Specification 43 23 13.14. The range of the sludge is listed in the table as 2.3-2.8% M Wilson 6/30/2021 15:49 Unchecked 952 Re: Re: Markup Callout G-007-00 The basis of the pump sizing should be clear in this design criteria table. MWalkowiak 7/19/2021 9:45 Unchecked 953 Re: Re: Re: Markup Callout G-007-00 OK, will add "Two Nozzles per Tank" to table M Wilson 7/26/2021 7:41 Unchecked 955 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:52 Unchecked 956 Markup Callout G-007-00 CLARIFY THAT LISTED CAPACITY IS PER PUMP MWalkowiak 7/19/2021 9:46 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 957 Re: Markup Callout G-007-00 At the top of the table it is called out to be "Centrifuge Feed Pumps (Each) M Wilson 6/29/2021 5:27 Unchecked 958 Markup Callout G-007-00 CLARIFY THAT LISTED CAPACITY IS PER GRINDER MWalkowiak 7/19/2021 9:46 Unchecked 959 Re: Markup Callout G-007-00 At the top of the table they are called out as "Digested Sludge Grinders (Each). M Wilson 6/29/2021 5:28 Unchecked 961 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:52 Unchecked 963 Re: Cloud G-007-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 964 Markup Callout G-007-00 PFD SHOWS A FUTURE FOURTH PUMP. CLARIFY. MWalkowiak 6/23/2021 13:02 Unchecked 965 Re: Markup Callout G-007-00 Noted, will add the words "space for 1 Future" M Wilson 6/29/2021 5:35 Unchecked 966 Cloud+ G-007-00 CALCULATIONS SHOWS 1000 GPM REQUIRED. UPDATE ACCORDINGLY. MNakamoto 7/29/2021 21:41 Checked 967 Re: Cloud+ G-007-00 Correct, the pump sizing was revised to 1000 gpm as noted in the calculations. Table will be updated accordingly. M Wilson 7/22/2021 17:24 Unchecked 970 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 971 Markup Callout G-008-00 CLARIFY THAT EACH CENTRIFUGE FEED PIPE HAS MULTIPLE FEED POINTS. MWalkowiak 6/23/2021 11:39 Unchecked 972 Re: Markup Callout G-008-00 This is too detailed for this table, refer to the P&ID's and drawings for this level of detail M Wilson 6/29/2021 5:37 Unchecked 973 Re: Re: Markup Callout G-008-00 The purpose of an incomplete listing feed points is not clear. MWalkowiak 7/19/2021 9:48 Unchecked 974 Re: Re: Re: Markup Callout G-008-00 its not an incomplete list, there are just more than one location to put it into the piping for each. Will add a note to clarify M Wilson 8/3/2021 17:17 Unchecked 976 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 977 Markup Callout G-008-00 POLYMER SOLUTION CONCENTRATION SHOULD THIS BE LOWER (0.1 TO 0.2%) BASE ON POST-MAKEDOWN DILUTION WATER. MWalkowiak 6/23/2021 11:43 Unchecked 978 Re: Markup Callout G-008-00 The design is based on 0.5%, the post dilution system is there based on the City's desire to have the capability to dilute further M Wilson 6/29/2021 5:39 Unchecked 980 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 982 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 983 Markup Callout G-008-00 POLYMER SOLUTION FLOW RATES WILL BE HIGHER WHEN POST-MAKEDOWN DILUTION WATER IS ADDED. MWalkowiak 6/23/2021 12:23 Unchecked 984 Re: Markup Callout G-008-00 Agree, however as noted for other comments this is not the design dilution rate, diluting below the 0.5% is not recommended, however the secondary dilution system was added as it was requested by the City M Wilson 6/29/2021 5:41 Unchecked 986 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 987 Markup Callout G-008-00 ADD INFORMATION ABOUT POST-MAKEDOWN DILUTION WATER SYSTEM. MWalkowiak 6/23/2021 12:25 Unchecked 988 Re: Markup Callout G-008-00 Post dilution is not a design criteria. It was provided to allow the City operations team flexibility at their request. Refer to the equipment specifications for details of the equipment to be provided M Wilson 7/11/2021 16:09 Unchecked 990 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 991 Markup Callout G-008-00 SHOULD THIS BE CHANGED TO 3 DUTY + 1 STANDBY + 2 FUTURE TO MATCH CENTRIFUGES? MWalkowiak 6/23/2021 12:26 Unchecked 992 Re: Markup Callout G-008-00 Yes M Wilson 6/29/2021 5:46 Unchecked 994 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:53 Unchecked 995 Markup Callout G-008-00 CONFIRM THAT CENTRATE PUMP CAPACITY IS SUFFICIENT FOR POLYMER DILUTION, INCLUDING POST-MAKEDOWN DILLUTION. MWalkowiak 6/23/2021 12:28 Unchecked 996 Re: Markup Callout G-008-00 As stated for the other comments on post dilution make-down. The design is for 0.5% and the pumps and systems are sized for that. Dilution below 0.5% can be done for lower solids flows, however the centrifuges themselves will not have the capability to operate at full capacity with polymer solution at 0.1% solution, there is simply too much water. Centrate system is capable of handling flows th M Wilson 6/30/2021 15:46 Unchecked at 998 Re: Cloud G-008-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 999 Markup Callout G-008-00 ADD NUMBER OF HOURS/DAYS ARE PROVIDED BY AVAILABLE CAKE STORAGE VOLUME. MWalkowiak 7/19/2021 9:52 Unchecked 1000 Re: Markup Callout G-008-00 To be parallel with the DS Storage Tank, will add M Wilson 6/29/2021 5:47 Unchecked 1003 Re: Cloud G-009-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1004 Markup Callout G-009-00 SHOULD ALL BURIED SLUDGE PIPE BE HDPE FOR STRUVITE CONTROL? IS EXPOSED DIP GLASS LINED? MWalkowiak 6/23/2021 12:55 Unchecked 1005 Re: Markup Callout G-009-00 Refer to the specifications for the lining on the DIP piping, which is glass lined. There are portions of the piping, as noted in the table, that are buried DIP at the tanks and pump stations as transitioning back and forth between HDPE and DIP is not practical for such short runs. M Wilson 6/29/2021 5:50 Unchecked 1006 Re: Re: Markup Callout G-009-00 Has DIP in buried service been accepted by City? MWalkowiak 7/19/2021 9:54 Unchecked 1007 Re: Re: Re: Markup Callout G-009-00 City to verify - Keep in mind that these are short runs of piping and transitioning from DIP to HDPE, and then back again would be problematic M Wilson 8/3/2021 17:19 Unchecked 1009 Re: Cloud G-009-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1010 Markup Callout G-009-00 IS DIP FOR SLUDGE AND CENTRATE SERVICE GLASS LINED? MWalkowiak 7/19/2021 9:55 Unchecked 1011 Re: Markup Callout G-009-00 yes. Lining for the piping is called out in the specifications, 40 05 19 for DIP which calls out all piping for sludge and centrate to the glass lined M Wilson 6/29/2021 5:52 Unchecked 1013 Re: Cloud G-009-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1015 Re: Cloud G-009-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1016 Markup Callout G-009-00 SHOULD OUTDOOR POL PIPING BE CPVC? MWalkowiak 6/23/2021 12:57 Unchecked 1017 Re: Markup Callout G-009-00 Agree, will revise table and specs to match M Wilson 7/22/2021 17:27 Unchecked 1020 Re: Cloud G-501-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1021 Markup Callout G-501-00 FUTURE TRS PUMP NOT LISTED IN DESIGN CRITERIA TABLE. MWalkowiak 7/19/2021 9:57 Unchecked 1022 Re: Markup Callout G-501-00 Noted, see response to same comment on G-007 M Wilson 6/30/2021 16:01 Unchecked 1024 Re: Cloud G-501-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1025 Markup Callout G-501-00 ADD ISOLATION VALVE IN CROSS-OVER LINE MWalkowiak 6/23/2021 13:04 Unchecked 1026 Re: Markup Callout G-501-00 Valve can be added here. Note this is an added cost item. M Wilson 7/22/2021 17:30 Unchecked 1028 Re: Snapshot G-501-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1030 Re: Line G-501-00 No reply required M Wilson 7/8/2021 5:54 Unchecked 1032 Re: Line G-501-00 No reply required M Wilson 7/8/2021 5:55 Unchecked 1034 Re: Line G-501-00 No reply required M Wilson 7/8/2021 5:55 Unchecked 1036 Re: Highlight G-501-00 No reply required M Wilson 7/8/2021 5:55 Unchecked 1038 Re: Cloud G-501-00 No reply required M Wilson 7/8/2021 5:55 Unchecked 1039 Markup Callout G-501-00 CONSIDER REVISING CONFIGURATION TO AVOID SINGLE POINT OF FAILURE MWalkowiak 6/23/2021 13:07 Unchecked 1040 Re: Markup Callout G-501-00 Refer to comments on the D sheets on this topic M Wilson 7/11/2021 16:11 Unchecked 1042 Re: Cloud G-501-00 No reply required M Wilson 7/8/2021 5:55 Unchecked 1043 Markup Callout G-501-00 IS THIS PIPE NEEDED? MWalkowiak 6/23/2021 13:07 Unchecked 1044 Re: Markup Callout G-501-00 Possibly no, See D sheets for responses to comments related to this piping arrangement and the comments made here and on the D sheets M Wilson 7/22/2021 17:31 Unchecked 1046 Re: Cloud G-501-00 No reply required M Wilson 7/8/2021 5:55 Unchecked 1048 Re: Cloud G-501-00 No reply required M Wilson 7/8/2021 5:55 Unchecked 1049 Markup Callout G-501-00 CONSIDER UPSIZING DRAINS TO 4" TO REDUCE PLUGGING POTENTIAL. MWalkowiak 6/23/2021 13:09 Unchecked 1050 Re: Markup Callout G-501-00 Will consider. 3" for a digested sludge drain that will typically see water seems sufficient M Wilson 8/3/2021 4:35 Unchecked 1052 Re: Cloud G-501-00 No reply required M Wilson 7/8/2021 5:56 Unchecked 1053 Markup Callout G-501-00 SIZE AND SERVICE LABELING NOT CONSISTENT WITH OTHER PFDS, TYP. MWalkowiak 6/23/2021 13:34 Unchecked 1054 Re: Markup Callout G-501-00 Noted M Wilson 7/11/2021 16:11 Unchecked 1055 Callout G-501-00 No way to isolate pumps or meters? Eric.Hovland 7/14/2021 8:38 Unchecked 1056 Re: Callout G-501-00 Not all valves shown on PFD. See P&ID's for detail on equipment isolation. Jonathan Keaney 7/14/2021 8:57 Unchecked 1062 Re: Cloud G-502-00 No reply required M Wilson 7/8/2021 5:56 Unchecked 1063 Markup Callout G-502-00 SHOULD POL SYSTEM USE BALL OR DIAPHRAGM VALVES, TYP? MWalkowiak 6/23/2021 13:14 Unchecked 1064 Re: Markup Callout G-502-00 Symbol is correct and agrees with the P&ID's M Wilson 7/22/2021 17:34 Unchecked 1066 Re: Cloud G-502-00 No reply required M Wilson 7/8/2021 5:56 Unchecked 1068 Re: Cloud G-502-00 No reply required M Wilson 7/8/2021 5:56 Unchecked 1073 Markup Callout G-502-00 CLARIFY INTENT OF PARALLEL CENTRATE MANIFOLDS. PIPES FROM CENTRIFUGES AND CONVEYORS TO MANIFOLDS IS NOT CONSISTENT. SHOULD CAPABILITY EXIST TO ROUTE ALL CEN FROM ALL CENTRIFUGES AND ALL CONVEYORS TO EITHER MANIFOLD? OTHERWISE, MAY NOT BE ABLE TO TAKE MANIFOLDS OUT OF SERVICE FOR MAINTENANCE. MWalkowiak 7/19/2021 10:02 Unchecked 1074 Re: Markup Callout G-502-00 Refer to D sheets for physical orientation of piping. Each row of centrifuges, and their respective conveyors, are aligned with a header on either side of the platform. Half of the system can be isolated for maintenance while the other half is operational. M Wilson 6/29/2021 6:01 Unchecked 1077 Markup Callout G-502-00 IS FUTURE VALVE REQUIRED HERE? MWalkowiak 6/23/2021 13:28 Unchecked 1078 Re: Markup Callout G-502-00 Yes, will add M Wilson 7/22/2021 17:35 Unchecked 1080 Markup Callout G-502-00 SINGLE COMMON MANIFOLD DOES NOT HAVE REDUNANCY. SINGLE POINT OF FAILURE. MWalkowiak 6/24/2021 9:18 Unchecked 1081 Re: Markup Callout G-502-00 See response to comments on the D sheets on the same subject M Wilson 7/11/2021 16:12 Unchecked 1083 Markup Text G-503-00 ADD EQUIPMENT TAGS AND SERVICE LABELS TO PIPES AND CONVEYORS MWalkowiak 6/23/2021 13:36 Unchecked 1084 Re: Markup Text G-503-00 Equipment tags not needed on a PFD, will add callouts for pipe and chute processes M Wilson 6/29/2021 6:06 Unchecked 1085 Re: Re: Markup Text G-503-00 Equipment names are provided on other PFDs. Should be consistent. MWalkowiak 7/19/2021 10:04 Unchecked 1086 Re: Re: Re: Markup Text G-503-00 OK, will add naming to the conveyors, other naming is shown M Wilson 7/26/2021 7:44 Unchecked 1091 Markup Callout G-503-00 NEED ADDITIONAL VALVES TO ALLOW CLEANING OF PIPELINE FROM CONNECTION AT BLIND FLANGE WITHOUT PUMP SHUTDOWN. MWalkowiak 6/23/2021 13:40 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1092 Re: Markup Callout G-503-00 Pumps are set up as 2 Duty and 1 Standby, operating with one pump isolated for cleaning places no process limitations on the system during cleaning, don't see the necessity for the additional valves M Wilson 6/29/2021 6:08 Unchecked 1093 Re: Re: Markup Callout G-503-00 Adding two valves as recommended greatly improves O&M flexibility at minimal cost. Doing so allows any combination of centrifuges and pumps in services. MWalkowiak 7/19/2021 10:07 Unchecked 1094 Re: Re: Re: Markup Callout G-503-00 These valves have no bearing on which centrifuges are operating. The added flexibility does not seem necessary. If City would like to add them, they can be added, but the costs will increase to provide them M Wilson 8/3/2021 17:22 Unchecked 1095 Markup Callout G-503-00 STRUVITE CHEMICAL CLEANING CONNECTION POINT MWalkowiak 6/23/2021 13:41 Unchecked 1096 Re: Markup Callout G-503-00 Flushing and cleaning connections will be included between 60 and final design, however they will not be shown on the PFD's M Wilson 6/29/2021 6:04 Unchecked 1099 Markup Callout G-503-00 SHOW FUTURE FOURTH PUMP LISTED IN DESIGN CRITERIA. MWalkowiak 6/24/2021 9:17 Unchecked 1100 Re: Markup Callout G-503-00 Agree, fourth future pump will be shown. M Wilson 7/20/2021 10:46 Unchecked 1102 Callout I-003-00 The I/O symbols used on the P&ID's should be defined on this sheet. pmatkinson 6/30/2021 14:15 Unchecked 1103 Re: Callout I-003-00 This is the City's standard Legend drawings. The definitions are on the next legend drawing. BUT22066 7/22/2021 7:23 Unchecked 1105 Callout I-004-00 Is thick vs. thin indicated by number of monitors? PMurphy 7/28/2021 11:05 Checked 1106 Re: Callout I-004-00 Thick vs. Thin will be called out on the control block diagrams. BUT22066 7/22/2021 7:30 Unchecked 1107 Callout I-004-00 No OIT panels Eric.Hovland 7/29/2021 14:00 Checked 1108 Re: Callout I-004-00 Will be changed to LHMI BUT22066 7/22/2021 7:23 Unchecked 1109 Text Box I-004-00 LHMI BUT22066 7/29/2021 14:00 Unchecked 1110 Text Box I-004-00 LHMI BUT22066 7/29/2021 14:00 Unchecked 1111 Text Box I-004-00 LOCAL BUT22066 7/29/2021 14:00 Unchecked 1113 Pen I-004-00 to BUT22066 7/29/2021 14:00 Unchecked 1118 Callout I-201-00 Per City standards provide fold-out shelf for laptop inside of door PMurphy 7/28/2021 11:05 Checked 1119 Re: Callout I-201-00 A fold-out shelf will be shown. BUT22066 7/22/2021 7:33 Unchecked 1121 Callout I-202-00 Redundant switches not shown. PMurphy 7/28/2021 11:05 Checked 1122 Re: Callout I-202-00 Redundant switch will be added. BUT22066 7/22/2021 13:38 Unchecked 1123 Callout I-202-00 Will there be adequate space for the 19" form-factor GRS1042? PMurphy 7/28/2021 11:05 Checked 1124 Re: Callout I-202-00 Detail will be revised to reflect a 19 in. switch. BUT22066 7/22/2021 13:39 Unchecked 1125 Callout I-202-00 Show a separate ground for analog signals to prevent noise PMurphy 7/28/2021 11:05 Checked 1126 Re: Callout I-202-00 A separate ground will be added for analog. BUT22066 7/22/2021 13:38 Unchecked 1127 Callout I-202-00 The automation guidelines are being revised (R7 to be issued in July 2021) to provide more specific details on the HPC800 and PDP panel section arrangement. Panel shall provide space for full expansion of PDP's I.e. 8 modules. pmatkinson 7/6/2021 11:47 Unchecked 1128 Re: Callout I-202-00 The detail will be revised to show reserved space. BUT22066 7/22/2021 13:31 Unchecked 1129 Callout I-202-00 Better to show side by side pmatkinson 7/6/2021 16:32 Unchecked 1130 Re: Callout I-202-00 Will be revised to show side-by-side. BUT22066 7/22/2021 13:32 Unchecked 1131 Callout I-202-00 Four shown on block diagram pmatkinson 7/6/2021 16:33 Unchecked 1132 Re: Callout I-202-00 This will be updated for four. BUT22066 8/2/2021 13:03 Unchecked 1134 Callout I-203-00 Where are fiber optic media converters for the Profibus in 85PNL1000 shown on network drawings PMurphy 7/28/2021 11:05 Checked 1135 Re: Callout I-203-00 Fiber media converters will be added. BUT22066 7/22/2021 13:46 Unchecked 1136 Callout I-203-00 Network diagram shows 3 BRS40 in 84PNL1000 PMurphy 7/28/2021 11:06 Checked 1137 Re: Callout I-203-00 BOM will be updated for BRS40. BUT22066 7/22/2021 13:47 Unchecked 1138 Callout I-203-00 Network diagram shows 0 GRS 1042 in 84PNL1000 PMurphy 7/28/2021 11:06 Checked 1139 Re: Callout I-203-00 BOM will be updated. BUT22066 7/22/2021 13:47 Unchecked 1140 Callout I-203-00 Is an external redundancy diode module required to make these redundant? PMurphy 7/28/2021 11:06 Checked 1141 Re: Callout I-203-00 BOM will be updated to call out external redundancy diodes. BUT22066 7/22/2021 13:54 Unchecked 1142 Callout I-203-00 these also have a specific base unit -TU846 pmatkinson 7/6/2021 16:44 Unchecked 1143 Re: Callout I-203-00 The base unit will be added to the BOM. BUT22066 8/2/2021 13:04 Unchecked 1144 Callout I-203-00 C1840? pmatkinson 7/6/2021 16:43 Unchecked 1145 Re: Callout I-203-00 This will be updated based on ABB input. BUT22066 8/2/2021 13:05 Unchecked 1147 Callout I-206-00 C1840 pmatkinson 7/6/2021 16:42 Unchecked 1148 Re: Callout I-206-00 This will be updated based on ABB input. BUT22066 8/2/2021 13:05 Unchecked 1149 Callout I-206-00 these also have a specific base unit -TU846 pmatkinson 7/6/2021 16:44 Unchecked 1150 Re: Callout I-206-00 The base units will be added to the BOM. BUT22066 8/2/2021 13:05 Unchecked 1152 Callout I-207-00 Power distribution unit? PMurphy 7/28/2021 11:06 Checked 1153 Re: Callout I-207-00 Power distribution will be added. BUT22066 7/22/2021 14:11 Unchecked 1154 Callout I-207-00 The City requires 1 year of video back up on site. Is there enough room for the Storage blades in this rack? Eric.Hovland 7/20/2021 9:43 Unchecked 1155 Re: Callout I-207-00 The layout will be updated to reflect room for storage blades in the rack BUT22066 8/2/2021 13:06 Unchecked 1156 Callout I-207-00 I thought the main fire alarm panel in the electrical room would be the connection to the main panel in the admin building. What is this for? Eric.Hovland 7/20/2021 9:47 Unchecked 1157 Re: Callout I-207-00 This will be removed if not required after coordination with the Fire Alarm Eng. BUT22066 8/2/2021 13:07 Unchecked 1159 Text Box I-501-00 Can the radar horn be removed from the tank without removing the whole assembly? and shutting down the tank? bpetrik 8/5/2021 8:50 Checked 1160 Re: Text Box I-501-00 Yes, the horn is raised up and the isolation valve closed to isolate the digester from atmosphere. BUT22066 7/12/2021 11:29 Unchecked 1161 Callout I-501-00 Sunshade detail for remote transmitters? PMurphy 7/28/2021 11:06 Checked 1162 Re: Callout I-501-00 Sun shade detail will be added for outside mounted transmitters. BUT22066 7/22/2021 14:13 Unchecked 1163 Cloud+ I-501-00 Eric H.: Can "disconnect" fittings be provided at all field instruments for ease of maintenance and LOTO. rmaidrand 7/7/2021 8:37 Unchecked 1164 Re: Cloud+ I-501-00 typically provided within the connection box for the instrument. Specifications note the details for the connections for the conduit to the device. M Wilson 8/2/2021 9:11 Unchecked 1166 Callout I-502-00 Flow meter not used in P&IDs is this for flow switches? PMurphy 7/28/2021 11:07 Checked 1167 Re: Callout I-502-00 Detail will be deleted. BUT22066 7/22/2021 14:21 Unchecked 1168 Callout I-502-00 Typically, there would be a pressure regulator with gauge for every valve serviced? pmatkinson 7/6/2021 13:10 Unchecked 1169 Re: Callout I-502-00 The detail will be coordinated with the Mech. Eng. for addition of a pressure regulator. BUT22066 8/2/2021 13:08 Unchecked 1170 Cloud+ I-502-00 Eric H: Consider use of hard tapped instrument fittings instead of annular seals due to simplified maintenance. rmaidrand 7/7/2021 8:07 Unchecked 1171 Re: Cloud+ I-502-00 Refer to alternatives proposed for us on the project that utilize flange mounted diaphragm seals to limit solids collection within lines M Wilson 7/26/2021 4:29 Unchecked 1172 Cloud+ I-502-00 Welded and filled when diaphragm and gauge are used. Eric.Hovland 7/20/2021 10:49 Unchecked 1173 Re: Cloud+ I-502-00 Typically don't weld to instrument connections as the components are provided as threaded connections for assembly purposes M Wilson 8/2/2021 10:15 Unchecked 1176 Callout I-601-00 move pmatkinson 6/30/2021 14:21 Unchecked 1177 Re: Callout I-601-00 This will be moved BUT22066 8/2/2021 13:09 Unchecked 1179 Callout I-601-00 Capacity to add 24 pairs to existing patch panel? PMurphy 7/28/2021 11:07 Checked 1180 Re: Callout I-601-00 Sufficient spare capacity was verified. BUT22066 7/22/2021 14:12 Unchecked 1181 Text Box I-601-00 Jerry A: Re-Route Cat6 to HPC controllers and the Modbus switch; [Pumping station] (see attached) AndyW 8/16/2021 14:05 Checked 1182 Re: Text Box I-601-00 This will be incorporated BUT22066 8/2/2021 13:08 Unchecked 1184 Text Box I-601-00 Jerry A: Fire alarm requires Ring network, need extra multimode fiber [Pumping station] (see attached) AndyW 8/16/2021 14:06 Checked 1185 Re: Text Box I-601-00 This will be incorporated. BUT22066 8/2/2021 13:08 Unchecked 1206 Text Box I-601-71 Sharik C: All equipment must bring total runtime hours signal to DCS and must be assigned a DCS tag. (Typical all sheets). AndyW 7/12/2021 13:38 Unchecked 1207 Re: Text Box I-601-71 The City previously told us to delete the run time signal. Isn't run time generated within the DCS based on the run signal? BUT22066 8/2/2021 13:20 Unchecked 1208 Text Box I-601-71 Sharik C: Start Commands are labeled HSC1. Stop Commands are labeled HSC2. (Typical all sheets). AndyW 8/16/2021 14:09 Checked 1209 Re: Text Box I-601-71 P&IDs will be reviewed to ensure the noted convention is observed throughout the P&IDs. BUT22066 8/2/2021 13:13 Unchecked 1210 Text Box I-601-71 Sharik C: Bring Additional signals from PLC to DCS using modbus, e.g. pump faults, hardwire brings a common fault, we would like to see these individual faults come through over modbus as well, many items in control strategy are not shown as coming back to DCS via modbus or via hardwired, however p&id states not all I/O is shown on sheets, please provide all I/O to better evaluate. (Typical all sh AndyW 8/16/2021 14:09 Checked 1211 Re: Text Box I-601-71 Individual alarm signals will be brought back via Modbus. BUT22066 8/2/2021 13:21 Unchecked 1212 Text Box I-601-71 Sharik C: many process valves do not have open/close feedback indications, these would be very helpful in determining flow path. (Typical all sheets). AndyW 8/16/2021 14:09 Checked 1213 Re: Text Box I-601-71 This was omitted except from key valves as a cost saving measure. Spare I/O will be reserved for future limit switches. BUT22066 8/2/2021 13:12 Unchecked 1215 Text Box I-601-84 if a pump is used for digester draining, the pressure may read a vacuum (suction lift when tank sludge level is low). will the pressure device be specified for this condition? bpetrik 8/5/2021 8:50 Checked 1216 Re: Text Box I-601-84 Yes, the pressure instruments will be specified for vacuum. BUT22066 8/2/2021 13:44 Unchecked 1218 Arc I-601-84 Consider moving iso valve to u/s side of flowmeter to allow servicing bpetrik 8/5/2021 8:50 Checked 1219 Re: Arc I-601-84 This will be coordinated with the Mech. Eng. BUT22066 8/2/2021 13:46 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1220 Re: Re: Arc I-601-84 The valves as located provide the ability to service the meter as currently shown. Suggest that they not be moved M Wilson 8/2/2021 13:52 Unchecked 1221 Text Box I-601-84 Provide iso valve on pump discharge to allow servicing when other two pumps are in operation (note that flow needs to go to both pipelines) bpetrik 7/28/2021 11:29 Checked 1222 Re: Text Box I-601-84 The isolation valve will be added. BUT22066 7/12/2021 11:41 Unchecked 1224 Text Box I-601-84 Will a pig launching station be provided? bpetrik 7/28/2021 11:30 Checked 1225 Re: Text Box I-601-84 Not preferred by City. Flushing systems provided instead. Jonathan Keaney 7/14/2021 17:08 Unchecked 1228 Text Box I-601-84 are both these valves normally closed, as shown? how do you get the flow from the lower pump to the upper piping? or vice versa? bpetrik 8/5/2021 8:53 Checked 1229 Re: Text Box I-601-84 Flows are normally dedicated as depicted. It is a manual alignment to introduce the standby pump or switch discharge points (bottom pump to top or top pump to bottom). BUT22066 7/12/2021 11:45 Unchecked 1230 Callout I-601-84 Per seal water detail, signal is low pressure, not low flow, typical throughout for type c seal water PMurphy 8/9/2021 14:55 Checked 1231 Re: Callout I-601-84 I/O descriptions will be changed to pressure. BUT22066 7/22/2021 14:24 Unchecked 1232 Callout I-601-84 the spec indicates double mech seal - indicate drain and provide bpetrik 8/5/2021 8:53 Checked 1233 Re: Callout I-601-84 Drains and drain lines will be shown. BUT22066 7/12/2021 11:56 Unchecked 1234 Callout I-601-84 SJ CAD Standard shows both PLC and HMI controls layers. Typically both would be shown so software interlocks can be defined and duty arrangements, se tpoints etc... can be defined and aligned with the strategies (typical to all) pmatkinson 8/11/2021 16:02 Checked 1235 Re: Callout I-601-84 The HMI level will be added. BUT22066 8/2/2021 13:42 Unchecked 1236 Callout I-601-84 Isolation valve is shown on mechanical drawing (10002-02) but not here. Bryan O&M 7/6/2021 15:27 Unchecked 1237 Re: Callout I-601-84 The isolation valve will be added. BUT22066 7/12/2021 11:40 Unchecked 1238 Cloud+ I-601-84 None of these flush points are shown on the mechanical drawings. What sizes are these supposed to be? Bryan O&M 7/6/2021 15:29 Unchecked 1239 Re: Cloud+ I-601-84 Flushing connections will be coordinated with the physical piping installation as part of Final Design M Wilson 7/8/2021 8:24 Unchecked 1240 Callout I-601-84 Flush points not shown on mechanical drawing Bryan O&M 7/6/2021 15:31 Unchecked 1241 Re: Callout I-601-84 Flushing Connections will be coordinated with the physical installation drawings during final design M Wilson 7/8/2021 8:23 Unchecked 1242 Cloud+ I-601-84 Are there any interlocks related to valve position that prevent pumps from starting - all pumps Tim Lewis 7/22/2021 14:26 Unchecked 1243 Re: Cloud+ I-601-84 The only pumps with valve position interlocks are the centrifuge feed pumps. Jonathan Keaney 8/2/2021 7:42 Unchecked 1246 Ellipse I-601-85 Confirm need this flushing connection? (cost savings) bpetrik 8/5/2021 8:59 Checked 1247 Re: Ellipse I-601-85 will confirm and delete if possible M Wilson 8/2/2021 11:16 Unchecked 1248 Arrow I-601-85 Can a smaller grinder be provided to match max pump capacity of 450 gpm? (cost savings idea) bpetrik 8/5/2021 8:59 Checked 1249 Re: Arrow I-601-85 The grinder is sized based on the pump. The capacity of the grinder is typically greater than the pump itself. M Wilson 8/2/2021 11:17 Unchecked 1251 Markup Callout I-601-85 SINGLE POINT OF FAILURE. SEE COMMENTS ON MECH DRAWNGS. MWalkowiak 6/28/2021 9:35 Unchecked 1252 Re: Markup Callout I-601-85 Refer to response on D sheets for same comment M Wilson 7/8/2021 4:38 Unchecked 1254 Markup Callout I-601-85 IS BYPASS AROUND CONTROL VALVE NECESSARY? MWalkowiak 6/28/2021 9:37 Unchecked 1255 Re: Markup Callout I-601-85 Bypass was added from a misunderstanding of a 30% city comment. Bypass can be removed. ove51156 7/21/2021 18:04 Unchecked 1257 Red Callout: New item to be added I-601-85 suggest deleting this connection line and connecting to header below to provide greater redundancy MNakamoto 7/29/2021 22:09 Checked 1258 Re: Red Callout: New item to be added I-601-85 Will review this arrangement along with the other comments on Single Point of Failure to address the cleanest way forward without increasing the cost of the project too much M Wilson 7/26/2021 7:36 Unchecked 1259 Red Callout: New item to be added I-601-85 suggest adding isolation valve in combination with dual piping to pump suction header. MNakamoto 6/28/2021 10:41 Unchecked 1260 Re: Red Callout: New item to be added I-601-85 Agree, this could provide a means of isolating 1/2 of the system at a time for cleaning/flushing M Wilson 7/26/2021 7:37 Unchecked 1261 Cloud+ I-601-85 will the density meter be used to optimize polymer dose? MNakamoto 6/28/2021 10:33 Unchecked 1262 Re: Cloud+ I-601-85 No. The density meter is for operational information. The dosage will be set by the operators and the feed of polymer will be flow paced from there to each centrifuge M Wilson 7/26/2021 7:38 Unchecked 1263 Re: Re: Cloud+ I-601-85 consider deleting for budget purposes. Based on discussion with Bruce, instruments may have limited value. MNakamoto 7/29/2021 22:11 Unchecked 1265 Markup Callout I-601-85 IS PIT NEEDED SINCE PITs ARE PROVIDED ON TRANSPORT PIPES? MWalkowiak 6/28/2021 13:44 Unchecked 1266 Re: Markup Callout I-601-85 Prefer PIT to allow operator to see status of flow through grinder as well as operation of the pump M Wilson 8/3/2021 4:45 Unchecked 1267 Callout I-601-85 No indication of high temperature anywhere? PMurphy 8/9/2021 14:55 Checked 1268 Re: Callout I-601-85 High temperature will be added. BUT22066 7/22/2021 14:24 Unchecked 1269 Callout I-601-85 Differs from spec (30 hp) bpetrik 7/28/2021 11:33 Checked 1270 Re: Callout I-601-85 Spec will be updated to say 40 hp. ove51156 7/21/2021 18:05 Unchecked 1271 Callout I-601-85 Spec indicates double mech seal - where is the drain? bpetrik 8/5/2021 8:59 Checked 1272 Re: Callout I-601-85 Noted, drain will be added M Wilson 7/26/2021 4:49 Unchecked 1273 Callout I-601-85 Is Grinder over torque driving the fault lamp ? That lamp is typically on a grinder VCP. pmatkinson 8/11/2021 16:15 Checked 1274 Re: Callout I-601-85 Will check and adjust if common to grinder mfgr. General fault shown. M Wilson 7/26/2021 4:50 Unchecked 1276 Callout I-601-85 Is the grinder called to run when any Centrifuge is started automatically? pmatkinson 8/11/2021 16:14 Checked 1277 Re: Callout I-601-85 Centrifuges will need to be started by operations staff, and the grinder is called to run with the feed pump M Wilson 7/26/2021 4:51 Unchecked 1278 Callout I-601-85 Fed from a new or existing compressor? pmatkinson 8/11/2021 16:14 Checked 1279 Re: Callout I-601-85 The fed is from the new compressed air system. ove51156 7/21/2021 18:02 Unchecked 1280 Cloud+ I-601-85 Sharik C: Individual pressure indicators needed on lines FC, FD and FE AndyW 8/16/2021 14:17 Checked 1281 Re: Cloud+ I-601-85 The physical distance between these connections is very short. Suggest that only a single PI be added. M Wilson 8/3/2021 12:35 Unchecked 1283 Callout I-601-85 I thought we talked about manifold system for grinders for reliability and flexibility Tim Lewis 7/23/2021 8:05 Unchecked 1284 Re: Callout I-601-85 This was discussed and the agreement was to proceed with the design with one grinder per pump, given that there is a fully redundant feed train (grinder, pump, centrifuge). Space and costs were higher for a manifolded arrangement. M Wilson 7/26/2021 4:52 Unchecked 1286 Callout I-602-00 Consider a fiber patch panel to manage these fiber pairs prior to the switches PMurphy 7/28/2021 11:07 Checked 1287 Re: Callout I-602-00 A fiber patch panel will be added. BUT22066 7/22/2021 14:22 Unchecked 1288 Callout I-602-00 Processors should be redundant per City standards PMurphy 7/28/2021 11:07 Checked 1289 Re: Callout I-602-00 Discussion with the City decided the multiple centrifuges provided the redundancy. BUT22066 7/22/2021 14:23 Unchecked 1291 Re: Callout I-602-00 Cable quantities will be updated. BUT22066 7/22/2021 14:22 Unchecked 1292 Callout I-602-00 The automation guidelines are being revised (R7 to be issued in July 2021) to provide more specific details on the HPC800 and PDP panel section arrangement. Panel shall provide space for full expansion of PDP's I.e. 8 modules. pmatkinson 7/6/2021 11:43 Unchecked 1293 Re: Callout I-602-00 The latest requirements will be incorporated. BUT22066 8/2/2021 13:09 Unchecked 1294 Callout I-602-00 Redundant DCU's pmatkinson 7/6/2021 15:25 Unchecked 1295 Re: Callout I-602-00 Redundant DCU will be shown. BUT22066 8/2/2021 13:10 Unchecked 1296 Callout I-602-00 PDP800 (FOUR IN TOTAL) pmatkinson 8/11/2021 16:02 Checked 1297 Re: Callout I-602-00 Correct, 4 PDP in total. BUT22066 8/2/2021 13:10 Unchecked 1299 Text Box I-602-00 Jerry A: Re-Route Cat6 to HPC controllers; use Hirschmann Profibus Converter OZD Profi 12M G11 (see attached) AndyW 8/16/2021 14:06 Checked 1300 Re: Text Box I-602-00 This will be incorporated. BUT22066 8/2/2021 13:09 Unchecked 1302 Text Box I-602-00 Jerry A: Fire alarm requires Ring network, need extra multimode fiber (see attached) AndyW 8/16/2021 14:08 Checked 1303 Re: Text Box I-602-00 This will be incorporated. BUT22066 8/2/2021 13:10 Unchecked 1318 I&C I-602-00 HIRSCHMANN PROFIBUS CONVERTER OZD PROFI 12M G11 (TYPICAL) BUT22066 7/29/2021 11:43 Unchecked 1319 Re: I&C I-602-00 This will be revised as noted. BUT22066 8/2/2021 13:11 Unchecked 1345 Text Box I-602-84 Vent needed on discharge side of trap? bpetrik 7/28/2021 11:31 Checked 1346 Re: Text Box I-602-84 Correct, the vent will be shown M Wilson 7/26/2021 4:31 Unchecked 1348 Text Box I-602-84 How will the level is observed? add in sight glasses? Note - on DTFU project the w/s level monitoring was an issue. bpetrik 8/5/2021 8:53 Unchecked 1349 Re: Text Box I-602-84 Don't suggest the use of a sight glass as they quickly become unusable due to being blocked by solids in the water. Suggest an alternate means of verifying be provided for quick visual confirmation of trap M Wilson 7/26/2021 4:33 Unchecked 1350 Arrow I-602-84 Iso valve needed bpetrik 7/28/2021 11:31 Checked 1351 Re: Arrow I-602-84 Yes, will add M Wilson 7/26/2021 4:33 Unchecked 1352 Ellipse I-602-84 Define what these connections are - in legend? or by standard detail? and why do many on same lines? bpetrik 7/28/2021 11:31 Checked 1353 Re: Ellipse I-602-84 Note 4 indicates that the flushing connections are to be Type 2 unless noted otherwise, and refers to detail B on Sheet D-505-85 which will be updated in the Final Design with the different Types (i.e. sizes) for use within the systems M Wilson 7/8/2021 8:21 Unchecked 1354 Callout I-602-84 AND DETAIL E FOR THE REMOTE INDICATOR? pmatkinson 8/11/2021 16:15 Checked 1355 Re: Callout I-602-84 Keynote 1 is directed towards the LE on the top of the tanks, not the WTR3 fill line to the trap M Wilson 7/26/2021 4:35 Unchecked 1356 Callout I-602-84 IS THE INTENT TO HAVE AN LT ON THE TOP OF THE TANK AND AN LI AT AN ACCESSIBLE HEIGHT ? pmatkinson 8/11/2021 16:15 Checked 1357 Re: Callout I-602-84 The instrument on the top of the tank is an LIT, and the DP level instrument on the bottom of the tank is also an LIT M Wilson 7/26/2021 4:36 Unchecked 1359 Markup Callout I-602-84 SEE COMMENTS ON MECH PLANS REGARDING SINGLE POINT OF FAILURE MWalkowiak 6/28/2021 9:16 Unchecked 1360 Re: Markup Callout I-602-84 Refer to response on D sheets for same comment M Wilson 7/8/2021 4:32 Unchecked 1362 Markup Callout I-602-84 SEE COMMENTS ON MECH DRAWINGS REGARDING SINGLE POINT OF FAILURE MWalkowiak 6/28/2021 9:18 Unchecked 1363 Re: Markup Callout I-602-84 Refer to response on D sheets for same comment M Wilson 7/8/2021 4:32 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1364 Markup Callout I-602-84 ADD FLUSHING CONNECTION, TYP MWalkowiak 7/19/2021 12:59 Unchecked 1365 Re: Markup Callout I-602-84 Refer to instrument installation detail on I-503 M Wilson 7/8/2021 4:34 Unchecked 1368 Markup Callout I-602-84 FLANGED OPENINGS NOT SHOWN ON MECH DRAWINGS. COORDINATE. MWalkowiak 6/28/2021 9:40 Unchecked 1369 Re: Markup Callout I-602-84 Noted, will correct presentation so that both show consistently M Wilson 7/26/2021 4:36 Unchecked 1371 Markup Callout I-602-84 ADD FLOW SWITCHES AS DISCUSSED DURING REVIEW MEETING. MWalkowiak 7/19/2021 13:01 Unchecked 1372 Re: Markup Callout I-602-84 Noted, mechanism for determining if the valve opens will be provided and shown in final design M Wilson 7/8/2021 4:36 Unchecked 1374 Markup Callout I-602-84 ADD FLOW SWITCHES AS DISCUSSED DURING REVIEW MEETING. MWalkowiak 7/19/2021 13:01 Unchecked 1375 Re: Markup Callout I-602-84 Duplicate comment, see response above M Wilson 7/8/2021 4:36 Unchecked 1376 Text Box I-602-84 Jonathan T: to include a position feedback on the solonoid valve 84SV10022 and 84SV10021. Sharik C has same comment. AndyW 8/16/2021 14:10 Checked 1377 Re: Text Box I-602-84 We will investigate limit switches on solenoid valves or switch to a motorized valve. BUT22066 8/2/2021 14:30 Unchecked 1378 Callout I-602-84 Sharik C: Tank level switch should be included as a redundancy to the ultrasonic level indicator and programmed as an interlock AndyW 8/16/2021 14:11 Checked 1379 Re: Callout I-602-84 A pressure-sensing level transmitter has been added for redundancy. BUT22066 8/2/2021 14:30 Unchecked 1381 Text Box I-602-84 Sharik C: All vent and pressure relief valves should have valve open / close feedback indicators. (Typical all sheets). AndyW 8/16/2021 14:15 Checked 1382 Re: Text Box I-602-84 open limit switches will be added BUT22066 8/2/2021 14:55 Unchecked 1383 Text Box I-602-84 Sharik C: Two level indicators on each tank, keynote 2 indicates these will be used to stop pumps, how will DCS determine which level indicator to use? Add level switches. AndyW 8/16/2021 14:16 Checked 1384 Re: Text Box I-602-84 An operator will select tank one, tank two or both tanks are in service. BUT22066 8/2/2021 14:52 Unchecked 1385 Text Box I-602-84 Sharik C: Pressure relief valves on storage tank need to have open/close feedback AndyW 8/16/2021 14:16 Checked 1386 Re: Text Box I-602-84 Noted. This was discussed after the completion of the 60% documents and will be added. M Wilson 7/26/2021 4:38 Unchecked 1388 Ellipse I-602-85 Does this valve (or gate?) need to be automated? for controlling slop time/diversion? bpetrik 7/28/2021 11:33 Checked 1389 Re: Ellipse I-602-85 No, this valve is there to allow for any potential backflow (foam or ??) from coming back up through the line and wetting the cake, but there is no reason for it to be automated M Wilson 6/29/2021 6:58 Unchecked 1390 Markup Callout I-602-85 SHOULD POLYMER INJECTION DIFFUSER BE PROVIDED HERE? MWalkowiak 7/19/2021 13:07 Unchecked 1391 Re: Markup Callout I-602-85 No, this is the connection directly at the centrifuge, which the energy of the sludge/polymer solution into the machine will provide adequate mixing M Wilson 6/29/2021 6:50 Unchecked 1394 Markup Callout I-602-85 SHOULD ISOLATION VALVES MOVE UPSTREAM OF PRVS? MWalkowiak 6/28/2021 9:51 Unchecked 1395 Re: Markup Callout I-602-85 Yes. this would allow the PRV's to be serviced M Wilson 7/11/2021 16:24 Unchecked 1396 Markup Callout I-602-85 CONFIRM VALVE TYPE FOR SMALL 3W PIPE. SHOULD BALL VALVES BE USED, TYP? MWalkowiak 7/19/2021 13:09 Unchecked 1397 Re: Markup Callout I-602-85 Will confirm and adjust. Bypass is typically a multi-turn valve to allow for operation is necessary when PRV assembly is out of service M Wilson 7/11/2021 16:25 Unchecked 1399 Markup Callout I-602-85 SAMPLING HERE MAY NOT WORK SINCE CENTRATE LINE IS NOT UNDER PRESSURE AT THIS POINT. MWalkowiak 7/19/2021 13:09 Unchecked 1400 Re: Markup Callout I-602-85 Refer to the centrate chute design which includes a "dam" for creating flow at this point. Has worked very successfully at other locations M Wilson 6/29/2021 6:57 Unchecked 1401 Callout I-602-85 Motor Temperature? PMurphy 8/9/2021 14:55 Checked 1402 Re: Callout I-602-85 I will coordinate with the Mech. Eng. and add as appropriate. BUT22066 8/2/2021 15:00 Unchecked 1403 Text Box I-602-85 Sharik C: Setpoints, controls, faults should be hardwire not over modbus. AndyW 8/16/2021 14:17 Checked 1404 Re: Text Box I-602-85 Controls, Faults and setpoints are hardwired. BUT22066 8/2/2021 15:00 Unchecked 1405 Cloud+ I-602-85 Sharik C: Clarify run request, rate request, dosage request. AndyW 8/16/2021 14:18 Checked 1406 Re: Cloud+ I-602-85 I will coordinate with the Mech. Eng. I believe these are signals from the Centrifuge PLC to the DCU. BUT22066 8/2/2021 15:11 Unchecked 1407 Callout I-602-85 Sharik C: Remote is HSR AndyW 8/16/2021 14:18 Checked 1408 Re: Callout I-602-85 Remote will be revised to HSR BUT22066 8/2/2021 15:08 Unchecked 1409 Callout I-602-85 Sharik C: Centrifuge in washdown should also be XL? AndyW 8/16/2021 14:18 Checked 1410 Re: Callout I-602-85 washdown will be changed to XL BUT22066 8/2/2021 15:08 Unchecked 1411 Text Box I-602-85 Sharik C: Missing Maintenance mode indication. AndyW 8/16/2021 14:19 Checked 1412 Re: Text Box I-602-85 Maintenance Mode DI will be added. BUT22066 8/2/2021 15:11 Unchecked 1413 Text Box I-602-85 Sharik C: Automated sequence or indications to determine which tank the pump output is flowing to? AndyW 8/16/2021 14:19 Checked 1414 Re: Text Box I-602-85 Indication for which centrifuge/inclined conveyor, distribution conveyor train and live bottom bin will be provided. BUT22066 8/2/2021 15:17 Unchecked 1417 Text Box I-603-84 Will the operation of the mixing pumps be tied into the level of he sludge storage tanks? (i.e. pump shutdown on lower sludge tank level) if so, provide I&C info. bpetrik 6/25/2021 8:30 Unchecked 1418 Re: Text Box I-603-84 Mixing will only stop on low-low level to prevent caviation. BUT22066 8/2/2021 15:17 Unchecked 1419 Rectangle I-603-84 Need this low pressure? or tie into tank level? (cost saving idea) bpetrik 8/5/2021 8:56 Checked 1420 Re: Rectangle I-603-84 I will coordinate with the Mech. Eng. for deleting the pressure switch. BUT22066 8/2/2021 15:22 Unchecked 1422 Markup Callout I-603-84 MISSING ISOLATION VALVE MWalkowiak 6/28/2021 9:26 Unchecked 1423 Re: Markup Callout I-603-84 Pump station is set up with a dedicated pump to each of the two loops, with a common spare between, therefore the valves in the headers that are denoted as NC serve as the isolation valves for this pump, no additional valves are needed M Wilson 7/11/2021 16:23 Unchecked 1424 Re: Re: Markup Callout I-603-84 The recommended isolation valve would maximize operational flexibility at minimal cost. MWalkowiak 7/19/2021 13:03 Unchecked 1425 Re: Re: Re: Markup Callout I-603-84 Don't see how the flexibility is changed, still don't see any reason for the additional valves requested M Wilson 7/26/2021 8:00 Unchecked 1427 Markup Callout I-603-84 MISSING ISOLATION VALVE MWalkowiak 6/28/2021 9:27 Unchecked 1428 Re: Markup Callout I-603-84 Pump station is set up with a dedicated pump to each of the two loops, with a common spare between, therefore the valves in the headers that are denoted as NC serve as the isolation valves for this pump, no additional valves are needed M Wilson 7/11/2021 16:23 Unchecked 1429 Re: Re: Markup Callout I-603-84 The recommended isolation valve would maximize operational flexibility at minimal cost. MWalkowiak 7/19/2021 13:04 Unchecked 1430 Re: Re: Re: Markup Callout I-603-84 Don't see how the flexibility is changed, still don't see any reason for the additional valves requested M Wilson 7/26/2021 8:04 Unchecked 1431 Callout I-603-84 The spec's call for double mech seals. where is the drain? bpetrik 8/5/2021 8:56 Checked 1432 Re: Callout I-603-84 Noted, the drains for seal water will be added M Wilson 7/26/2021 4:39 Unchecked 1435 Callout I-603-84 Why are there no Flow meters anywhere? Eric.Hovland 7/20/2021 12:51 Unchecked 1436 Re: Callout I-603-84 Not critical to know the flowrate for the mixing system, therefore no flow meters are included M Wilson 7/26/2021 4:38 Unchecked 1439 Callout I-603-84 For all pumps: Are these valves automated and are they part of the permissives for the pumps? Eric.Hovland 7/20/2021 13:00 Unchecked 1440 Re: Callout I-603-84 Valves are not automated. BUT22066 8/2/2021 15:28 Unchecked 1442 Text Box I-603-84 Valve position interlocks for pumps associated with suction or discharge valve potion? ZSO, ZSC Tim Lewis 7/22/2021 14:30 Unchecked 1443 Re: Text Box I-603-84 Per Mark Wilson on similar comment "This would require the addition of limit switches to the manual operated valves which would include added costs for the switches, cable, conduit, and the I/O associated with their inclusion. " Jonathan Keaney 8/2/2021 7:43 Unchecked 1444 Re: Text Box I-603-84 We did not provide position indicators for the valves to the dedicated pumps as they would normally be open. These could be provided if desired by the City, however there will be added cost to the project for them M Wilson 8/2/2021 9:07 Unchecked 1446 Markup Text I-603-85 SEE COMMENTS ON I-601-85 MWalkowiak 7/19/2021 13:10 Unchecked 1447 Re: Markup Text I-603-85 Refer to Responses on I-601-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:39 Unchecked 1449 Text Box I-604-84 Will a pigging station be provided? bpetrik 7/28/2021 11:32 Checked 1450 Re: Text Box I-604-84 No as discussed in the BODR the lines are to be provided with flushing connections as shown, no pigging stations are to be included M Wilson 7/26/2021 4:40 Unchecked 1451 Ellipse I-604-84 Why 3 separate sample taps for same line? bpetrik 7/28/2021 11:32 Checked 1452 Re: Ellipse I-604-84 Can consolidate the flush connections to a single M Wilson 7/26/2021 4:41 Unchecked 1454 Text Box I-604-84 Size of flushing connection? bpetrik 7/28/2021 11:32 Checked 1455 Re: Text Box I-604-84 Refer to detail B on sheet D-505-85 as noted in note 4 above. Detail B will be updated for the final design to show sizing for a Type 1 and Type 2 flush connection and as noted in the note 4 all connections will be Type 1 unless noted otherwise. Type 1 connections are to be 2 inch. Type 2 (for the longer runs and larger lines) are to be 4 inch. M Wilson 7/26/2021 4:44 Unchecked 1458 Text Box I-604-84 These pumps are now on VFDs - indicate.? provide flow range? bpetrik 8/5/2021 8:58 Checked 1459 Re: Text Box I-604-84 We don't indicate variable or constant speed here. This info is in the specifications for the equipment or on the Design Criteria Sheets. M Wilson 7/26/2021 4:45 Unchecked 1461 Markup Callout I-604-84 SEE COMMENTS ON MECH PLANS REGARDING SINGLE POINT OF FAILURE. MWalkowiak 6/28/2021 9:11 Unchecked 1462 Re: Markup Callout I-604-84 Refer to response on D sheets for same comment M Wilson 7/8/2021 4:37 Unchecked 1464 Markup Callout I-604-84 CAN PIPE BE DELETED? MWalkowiak 6/28/2021 9:12 Unchecked 1465 Re: Markup Callout I-604-84 I will coordinate with the Mech. Eng. and revised appropriately. BUT22066 8/2/2021 15:31 Unchecked 1467 Markup Callout I-604-84 NEED VALVE HERE. MWalkowiak 6/28/2021 9:12 Unchecked 1468 Re: Markup Callout I-604-84 I will coordinate with the Mech. Eng. and revised appropriately. BUT22066 8/2/2021 15:30 Unchecked 1469 Callout I-604-84 The spec indicates 77 ft TDH and 30 hp - confirm bpetrik 7/28/2021 11:32 Checked 1470 Re: Callout I-604-84 Data for the equipment between the P&ID's, Design Criteria Sheets, and Specifications to be coordinated. M Wilson 7/26/2021 4:46 Unchecked 1471 Callout I-604-84 the spec indicates douple mech seal - where is the drain? bpetrik 8/5/2021 8:58 Checked 1472 Re: Callout I-604-84 Noted, drains to be added M Wilson 7/26/2021 4:46 Unchecked 1476 Callout I-604-84 Sharik C: Line "AN" does not have a flow meter, add flow meter to replicate line "AO" AndyW 8/16/2021 14:17 Checked 1477 Re: Callout I-604-84 This was agreed to have only a single FM for this pump station from a cost savings standpoint. M Wilson 8/3/2021 12:37 Unchecked 1478 Callout I-604-84 For all pumps: Are these valves automated and are they part of the permissives for the pumps? Eric.Hovland 7/20/2021 13:08 Unchecked 1479 Re: Callout I-604-84 No, these valves are manual as shown The need to switch to the common standby pump is infrequent M Wilson 7/26/2021 4:47 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1481 Text Box I-604-84 Valve position interlocks for pumps associated with suction or discharge valve potion? ZSO, ZSC Valve lineup indication on DCS? Tim Lewis 7/22/2021 14:33 Unchecked 1482 Re: Text Box I-604-84 This would require the addition of limit switches to the manual operated valves which would include added costs for the switches, cable, conduit, and the I/O associated with their inclusion. City to provide direction on if they are to be added M Wilson 7/26/2021 4:49 Unchecked 1484 Markup Text I-604-85 SEE COMMENTS ON I-602-85 MWalkowiak 7/19/2021 13:10 Unchecked 1485 Re: Markup Text I-604-85 Refer to Responses on I-602-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:41 Unchecked 1486 Callout I-604-85 Third E-stop? PMurphy 8/9/2021 14:55 Checked 1487 Re: Callout I-604-85 Yes it would appear that there is one too many. Will confirm and revise accordingly M Wilson 8/3/2021 4:49 Unchecked 1489 Markup Text I-605-85 SEE COMMENTS ON I-601-85 MWalkowiak 7/19/2021 13:10 Unchecked 1490 Re: Markup Text I-605-85 Refer to Responses on I-601-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:39 Unchecked 1492 Markup Text I-606-85 SEE COMMENTS ON I-602-85 MWalkowiak 7/19/2021 13:10 Unchecked 1493 Re: Markup Text I-606-85 Refer to Responses on I-602-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:41 Unchecked 1494 Callout I-606-85 SUGGEST A RUN REQUEST BE 'HS' AS THEY ARE A COMMAND (TYP.) pmatkinson 8/11/2021 16:13 Checked 1495 Re: Callout I-606-85 Will review and correct as appropriate M Wilson 8/3/2021 12:38 Unchecked 1498 Markup Text I-607-85 SEE COMMENTS ON I-601-85 MWalkowiak 7/19/2021 13:10 Unchecked 1499 Re: Markup Text I-607-85 Refer to Responses on I-601-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:40 Unchecked 1500 Callout I-607-85 the spec indicates 4 inch connections. confirm size and modify accordingly bpetrik 7/28/2021 11:34 Checked 1501 Re: Callout I-607-85 6 inch connection is correct. Spec will be updated. ove51156 7/21/2021 18:25 Unchecked 1503 Markup Text I-608-85 SEE COMMENTS ON I-602-85 MWalkowiak 7/19/2021 13:10 Unchecked 1504 Re: Markup Text I-608-85 See responses on I-602-85 M Wilson 7/11/2021 16:26 Unchecked 1506 Markup Text I-609-85 SEE COMMENTS ON I-601-85 MWalkowiak 7/19/2021 13:10 Unchecked 1507 Re: Markup Text I-609-85 Refer to Responses on I-601-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:40 Unchecked 1509 Markup Text I-610-85 SEE COMMENTS ON I-602-85 MWalkowiak 7/19/2021 13:11 Unchecked 1510 Re: Markup Text I-610-85 Refer to Responses on I-602-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:41 Unchecked 1512 Markup Text I-611-85 SEE COMMENTS ON I-601-85 MWalkowiak 7/19/2021 13:11 Unchecked 1513 Re: Markup Text I-611-85 Refer to Responses on I-601-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:40 Unchecked 1515 Markup Text I-612-85 SEE COMMENTS ON I-602-85 MWalkowiak 7/19/2021 13:11 Unchecked 1516 Re: Markup Text I-612-85 Refer to Responses on I-602-85 or referenced drawings in responses on that sheet M Wilson 7/8/2021 4:41 Unchecked 1519 Markup Callout I-613-85 SHOW EXTENSION AS FUTURE MWalkowiak 7/19/2021 13:11 Unchecked 1520 Re: Markup Callout I-613-85 Agree, will show as future in final design M Wilson 7/8/2021 4:42 Unchecked 1521 Callout I-613-85 No. 7? PMurphy 6/29/2021 14:43 Unchecked 1522 Re: Callout I-613-85 Numbering shown is correct M Wilson 7/30/2021 5:21 Unchecked 1523 Callout I-613-85 No. 8? PMurphy 6/29/2021 14:43 Unchecked 1524 Re: Callout I-613-85 Numbering shown is correct M Wilson 7/30/2021 5:21 Unchecked 1525 Text Box I-613-85 Sharik C: what automation is available on valves 10062-xx? AndyW 8/16/2021 14:20 Checked 1526 Re: Text Box I-613-85 These are manual valves. No automation is needed or available. They serve as added redundancy for the conveyors trains M Wilson 8/3/2021 12:39 Unchecked 1527 Text Box I-613-85 Sharik C: Is there a bypass between the 3 conveyors, in case one is malfunctioning? AndyW 8/16/2021 14:20 Checked 1528 Re: Text Box I-613-85 There are two trains with one cross over. If one conveyor fails you would switch to the other train. ove51156 7/21/2021 18:38 Unchecked 1529 Text Box I-613-85 Sharik C: Automated sequence for conveyer selection. AndyW 8/16/2021 14:20 Checked 1530 Re: Text Box I-613-85 The conveyors are selected as a series, unless the added redundancy of 10062-xx valves are utilized, which would be an emergency situation. M Wilson 8/3/2021 12:41 Unchecked 1531 Callout I-613-85 If a conveyor is faulted/overwhelmed/ malfunctioning does another start up and take over automatically? Eric.Hovland 7/20/2021 13:25 Unchecked 1532 Re: Callout I-613-85 Alarms would be generated, sludge flow to the centrifuges would be paused, and the operations staff could switch to the alternate conveyor train M Wilson 7/26/2021 4:55 Unchecked 1533 Callout I-613-85 Are gates automated to close when trucks are full? If all gates are closed does conveyor stop and gate from above automatically shut as well? Eric.Hovland 7/20/2021 13:33 Unchecked 1534 Re: Callout I-613-85 Refer to the control descriptions for a description of the operation. There is a link between the weight of the truck and the closing of the gates/operation of the live bottom screws M Wilson 7/26/2021 4:57 Unchecked 1538 Re: Cloud I-614-85 No reply required M Wilson 7/8/2021 4:44 Unchecked 1539 Markup Callout I-614-85 SHOW EXTENSION AS FUTURE MWalkowiak 7/19/2021 13:12 Unchecked 1540 Re: Markup Callout I-614-85 Agree, will show as future in final design M Wilson 7/8/2021 4:43 Unchecked 1541 Callout I-614-85 Train 1? PMurphy 7/28/2021 10:59 Checked 1542 Re: Callout I-614-85 Will be updated to say Train 1 ove51156 7/22/2021 4:34 Unchecked 1543 Callout I-614-85 Train 1? PMurphy 7/28/2021 10:59 Checked 1544 Re: Callout I-614-85 Will be updated to say Train 1 ove51156 7/22/2021 4:34 Unchecked 1547 Text Box I-615-85 Do these gates have drains (in the pan) to direct any leakage to an enclosed drain system? bpetrik 7/28/2021 11:34 Checked 1548 Re: Text Box I-615-85 There are no "pans" associated with the gates. The gates are slide type with wiper seals and are specified to be drip-less, refer to specification 46 09 06 for details on the gates M Wilson 6/29/2021 7:51 Unchecked 1549 Text Box I-615-85 is foul air only taken from the bins, as shown? or are there other pickups in the truck bay? if so, show, as req'd bpetrik 7/28/2021 11:34 Checked 1550 Re: Text Box I-615-85 Refer to sheet I-624-85 which shows all of the odor control collection points. Air is pulled from the truck bays, which is depicted on that sheet, only connections to the process equipment were shown here M Wilson 6/29/2021 7:43 Unchecked 1551 Re: Text Box I-615-85 There are pickups in the truck bay. they are shown on I-624-85. ove51156 7/23/2021 7:12 Unchecked 1553 Re: Cloud I-615-85 No reply required M Wilson 7/8/2021 4:44 Unchecked 1554 Markup Callout I-615-85 CLARIFY IF BOTH METAL ROLLUP DOOR (FOR WEATHER/SECURITY) AND FAST-ACTING CLOTH DOORS (FOR NORMAL ODOR CONTAINMENT) ARE PROVIDED. HOW LONG DOES METAL DOOR TAKE TO OPEN/CLOSE? MWalkowiak 7/19/2021 13:12 Unchecked 1555 Re: Markup Callout I-615-85 Given that the City opted for a guard shack and security around the facility, the truck bays are fitted with fast acting fabric doors only as there really is no need for security doors on the building. This represented a pretty significant cost savings to the facility M Wilson 6/29/2021 7:02 Unchecked 1557 Re: Cloud I-615-85 No reply required M Wilson 7/8/2021 4:44 Unchecked 1559 Re: Cloud I-615-85 No reply required M Wilson 7/8/2021 4:45 Unchecked 1560 Markup Callout I-615-85 SHOULD "TOO FAR" INDICATIONS BE ADDED? MWalkowiak 7/19/2021 13:13 Unchecked 1561 Re: Markup Callout I-615-85 given the wide variety of different truck sizes, there really is no way to gage exactly where they will need to position. The vendor who will be hauling will most likely work with the City, based on their trucks, to optimize the location to park for loading M Wilson 6/29/2021 7:00 Unchecked 1563 Re: Cloud I-615-85 No reply required M Wilson 7/8/2021 4:45 Unchecked 1564 Markup Callout I-615-85 CONFIRM THAT CONFIGURATION IS SIZED FOR BOTH HIGHWAY TRAILERS AND MULTI-MODAL CONTAINERS MWalkowiak 6/28/2021 14:18 Unchecked 1565 Re: Markup Callout I-615-85 Refer to the physical layout drawings for this. If the container is too short for all three gates, then one of the three can remain shut during loading M Wilson 6/29/2021 7:44 Unchecked 1567 Markup Callout I-615-85 ARE FOUR LOAD CELLS ENOUGH? SCALES ARE VERY LONG. MWalkowiak 6/28/2021 14:23 Unchecked 1568 Re: Markup Callout I-615-85 No, the intention was to show that there would be cells at each end. As the scale will be broken up into multiple "bridges" there will be multiple load cells for each bridge. Will add notation to indicate this M Wilson 7/26/2021 4:59 Unchecked 1570 Markup Callout I-615-85 IS THIS THE LOCAL CONTROL ROOM OR THE MAIN CONTROL ROOM? NEED MORE CONTROLS (E.G., SCALE TARE, LOAD WEIGHT SELECTOR, ETC.). ALSO, ALL INFO SHOULD BE AVAILABLE AT MAIN CONTROL ROOM. MWalkowiak 6/28/2021 14:41 Unchecked 1571 Re: Markup Callout I-615-85 Yes the controller for the scales along with an HMI for the plant control system will be available in the loadout control room M Wilson 7/28/2021 12:18 Unchecked 1572 Callout I-615-85 the spec calls for drain connections on the conveyors. Confirm if req'd bpetrik 6/30/2021 10:27 Unchecked 1573 Re: Callout I-615-85 The are required and will be provided in accordance with the specification requirements M Wilson 7/8/2021 4:47 Unchecked 1574 Callout I-615-85 Nora - Clarify the purpose of the three sets of the go and stop instruments in each truck bay (i.e., G-H, D, and E). Are G-H associated with the indicator lights outside the loadout building’s entrance? Are D and E meant to indicate when/which bins have cake in them? Aric 8/17/2021 11:41 Checked 1575 Re: Callout I-615-85 One set is outside of the building to indicate to go to that Bay, and the other two are for which bin to line up under within the bay M Wilson 7/11/2021 15:38 Unchecked 1576 Text Box I-615-85 Nora - Are the exit rollup door openers proximity sensors or will they be controlled manually from the truck loading building's control room? Aric 8/17/2021 11:41 Checked 1577 Re: Text Box I-615-85 Exit doors are opened manually from the control room M Wilson 7/11/2021 15:39 Unchecked 1578 Text Box I-615-85 Based on the current configuration, would any rollup door (entrance or exit) automatically open if a truck approached an available bay but a cake storage bin gate was open in the other bay? Aric 8/17/2021 11:41 Checked 1579 Re: Text Box I-615-85 As we have it now, the door to the bay in which the truck is coming into would not open if there was a truck in that bay (loading or not), but not necessarily the opposite bay. This will potentially slow down the loading process to do so. M Wilson 7/11/2021 16:00 Unchecked 1580 Callout I-615-85 If foul odor system fails does the system shut down/ is there an alarm to tell anyone it has failed in the building? What happens during foul air system maintenance or repairs? Eric.Hovland 7/20/2021 13:40 Unchecked 1581 Re: Callout I-615-85 If the foul air system fails there will be an alarm but other systems don't automatically shut down. There are two fans so the system doesn't need to be taken off line for maintenance. ove51156 7/23/2021 7:10 Unchecked 1583 Markup Text I-616-85 SEE COMMENTS ON I-615-85 MWalkowiak 6/28/2021 14:22 Unchecked 1584 Re: Markup Text I-616-85 See responses on I-615-85 ove51156 7/23/2021 8:01 Unchecked 1585 Text Box I-616-85 Sharik C: Missing truck weight limit setpoint. AndyW 8/16/2021 14:21 Checked 1586 Re: Text Box I-616-85 Truck weight limit will depend on the size of the truck and will be coordinated in the field at startup. ove51156 7/23/2021 7:41 Unchecked 1587 Callout I-616-85 Sharik C: Keynote 5 on legend is missing. AndyW 8/16/2021 14:21 Checked 1588 Re: Callout I-616-85 This will be revised to keynote 3 and keynote 3 will refer to the installation detail. BUT22066 8/3/2021 7:35 Unchecked 1589 Text Box I-616-85 Sharik C: Does pnuematic valve check for air pressure? How to determine if valve is "available". AndyW 8/16/2021 14:22 Checked 1590 Re: Text Box I-616-85 As long as the compressed air system is available the pneumatic valves are available. BUT22066 8/3/2021 7:37 Unchecked 1591 Text Box I-616-85 Sharik C: Automated sequence needs to be programmed to close all truck loading valves, individual controls must remain. AndyW 8/16/2021 14:22 Checked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1592 Re: Text Box I-616-85 The compressor air system will notify operations if the system has failed. ove51156 7/23/2021 8:00 Unchecked 1593 Text Box I-616-85 Sharik C: Is one pnuematic valve common between the two storage bins? AndyW 8/16/2021 14:22 Checked 1594 Re: Text Box I-616-85 Yes, this is to help allow different size trucks and still allow the doors to close. ove51156 7/23/2021 7:40 Unchecked 1595 Callout I-616-85 Does any single estop shut all gates and stop all loading or is each separate? Eric.Hovland 7/29/2021 14:09 Checked 1596 Re: Callout I-616-85 This will be coordinated, and yes it will shut down all of the live bottom conveyors M Wilson 7/26/2021 5:02 Unchecked 1598 Ellipse I-617-85 Consider moving the iso valvel d/s of the pressure device to allow servicing of the pressure device without shutting down system bpetrik 7/28/2021 11:35 Checked 1599 Re: Ellipse I-617-85 The valve and pressure switch will be swapped as recommended. BUT22066 8/3/2021 7:39 Unchecked 1601 Re: Arrow I-617-85 Valve will be relocated as shown. ove51156 7/23/2021 8:13 Unchecked 1603 Markup Callout I-617-85 SINGLE POINNT OF FAILURE. SEE COMMENTS ON MECH DRAWINGS MWalkowiak 6/28/2021 10:52 Unchecked 1604 Re: Markup Callout I-617-85 The ability is there to clean each of the upstream headers with a portion of the dewatering facility operational. This line could be periodically cleaned by utilizing the storage volume of the DS tanks to allow for shutdown of the dewatering process rather than adding additional piping M Wilson 7/11/2021 16:29 Unchecked 1606 Red Callout: New item to be added I-617-85 delete this segment and add red line for redundancy MNakamoto 7/29/2021 22:13 Checked 1607 Re: Red Callout: New item to be added I-617-85 As stated on the D sheets there is a small cost associated with this change. If city approves the cost the piping will be added. Suggest also moving valve 10094-24 to the pipe between the two wetwells. ove51156 7/23/2021 8:10 Unchecked 1608 Cloud+ I-617-85 Does 12" Cent Connect here? MNakamoto 7/29/2021 22:14 Checked 1609 Re: Cloud+ I-617-85 Yes, it appears that the note on the drawing cut off the line, will correct M Wilson 7/8/2021 8:18 Unchecked 1611 Markup Callout I-617-85 CONSIDER CONSOLIDATING INTO A SINGLE TAP. ADD FLUSHING CONNECTION BETWEEN ISLATION VALVE AND DIAPHRAGM. TYP MWalkowiak 6/28/2021 15:02 Unchecked 1612 Re: Markup Callout I-617-85 Will consider combining into a single tap. Refer to the instrument details for the flushing connection on the DS piping upstream of the diaphragm seal M Wilson 7/11/2021 16:31 Unchecked 1614 Markup Callout I-617-85 ADDING PROCESS DRAINAGE HERE WILL CORRUPT CEN SAMPLES. NEED TO OVERALL COORDINATED PLAN FOR SAMPLING LOCATIONS. MWalkowiak 7/19/2021 13:16 Unchecked 1615 Re: Markup Callout I-617-85 Centrate can be sampled from each of the centrifuges, there is no real reason to sample the centrate as a composite sample, this should not be an issue M Wilson 7/11/2021 16:32 Unchecked 1617 Markup Callout I-617-85 ARE THESE SAMPL POINTS? IF SO, NEED TO ROUTE TO A SINK TO ALLOW FLUSHING TO GET FRESH SAMPLE. MWalkowiak 6/28/2021 14:55 Unchecked 1618 Re: Markup Callout I-617-85 They are flushing connections. ove51156 7/23/2021 8:02 Unchecked 1620 Markup Callout I-617-85 UNUSUAL TO USE PRESSURE TYPE SWITCH. WOULD FLOAT SWITCHES OR CONDUCTIVITY PROBES IN WET WELL BE BETTER? TYP MWalkowiak 6/28/2021 15:01 Unchecked 1621 Re: Markup Callout I-617-85 This is pretty common for centrate wetwells, and they are readily accessible for maintenance without entering the wetwell. M Wilson 8/3/2021 17:35 Unchecked 1625 Markup Callout I-617-85 REVIEW VALVE TYPES ON 3W LINES. MWalkowiak 6/28/2021 15:02 Unchecked 1626 Re: Markup Callout I-617-85 Will review M Wilson 7/11/2021 16:32 Unchecked 1627 Re: Re: Markup Callout I-617-85 Butterfly valve is correct. Will change the gate valves to ball valves. ove51156 7/23/2021 8:23 Unchecked 1629 Markup Callout I-617-85 IS THIS TAP FOR A FUTURE PUMP? 10" BALL VALVE SHOULD CHANGE TO PLUG VALVE, AND QUICK CONNECT SHOULD BE BLIND FLANGE. MWalkowiak 6/28/2021 15:04 Unchecked 1630 Re: Markup Callout I-617-85 No this is a flushing connection. ove51156 7/23/2021 8:21 Unchecked 1631 Callout I-617-85 Add hardwired low level interlock from wetwell per control strategies PMurphy 8/13/2021 9:53 Checked 1632 Re: Callout I-617-85 Noted, will add M Wilson 8/3/2021 4:52 Unchecked 1633 Callout I-617-85 Normally closed for flow metering? PMurphy 7/28/2021 10:59 Checked 1634 Re: Callout I-617-85 Yes, will denote as such M Wilson 7/8/2021 8:17 Unchecked 1635 Callout I-617-85 Spec indicates 49 ft head bpetrik 7/28/2021 11:35 Checked 1636 Re: Callout I-617-85 Spec and P&ID will be coordinated for final design ove51156 7/23/2021 8:20 Unchecked 1637 Callout I-617-85 The spec indicates double mech seal - where is the drain? bpetrik 8/5/2021 9:01 Checked 1638 Re: Callout I-617-85 Noted, drains and connection to the Plant Drain Pump Station will be provided M Wilson 7/8/2021 4:49 Unchecked 1639 Text Box I-617-85 Sharik C: process valve feedback switches needed to provide a pump available signal. Need automated sequence to determine pump availability. AndyW 8/16/2021 14:23 Checked 1640 Re: Text Box I-617-85 Valve limit switches for manual valves were omitted as a cost saving measure. BUT22066 8/3/2021 7:44 Unchecked 1641 Text Box I-617-85 Sharik C: Additional specific alarms missing, should be brought over modbus (motor casing, etc) Common fault must still remain hardwired. AndyW 8/16/2021 14:23 Checked 1642 Re: Text Box I-617-85 There are no additional alarms. BUT22066 8/3/2021 7:44 Unchecked 1643 Text Box I-617-85 Sharik C: Height feedback on wet well gate missing. AndyW 8/16/2021 14:23 Checked 1644 Re: Text Box I-617-85 It is an open/closed non-modulating gate. Open and closed position are provided. BUT22066 8/3/2021 7:43 Unchecked 1645 Text Box I-617-85 Sharik C: Level setpoints are missing. AndyW 8/16/2021 14:24 Checked 1646 Re: Text Box I-617-85 Noted, setpoints will be shown on the Final design M Wilson 8/3/2021 12:49 Unchecked 1647 Callout I-617-85 For all pumps: Are these valves automated and are they part of the permissives for the pumps? Eric.Hovland 7/20/2021 13:59 Unchecked 1648 Re: Callout I-617-85 They are manual valves for isolation of the pump during maintenance only. ove51156 7/23/2021 8:12 Unchecked 1650 Cloud+ I-617-85 No metering of centrate if any of these valves are used, why is that? Minus the sample ports of course. Eric.Hovland 7/20/2021 14:05 Unchecked 1651 Re: Cloud+ I-617-85 Valve were requested for isolation to flush/clean pipes. Normal flow would be through the flow meter. ove51156 7/23/2021 8:27 Unchecked 1653 Callout I-618-85 Float not shown PMurphy 7/28/2021 10:59 Checked 1654 Re: Callout I-618-85 Noted, float will be added M Wilson 7/26/2021 5:03 Unchecked 1655 Text Box I-618-85 Cleanout provided? bpetrik 7/28/2021 11:35 Checked 1656 Re: Text Box I-618-85 Yes, there will be a connection point for a cleanout connection M Wilson 7/26/2021 5:04 Unchecked 1658 Markup Callout I-618-85 CITY REQUESTED THESE VALVE BE INSTALLED OUTDOORS (NOT IN VAULT). MWalkowiak 6/28/2021 15:08 Unchecked 1659 Re: Markup Callout I-618-85 Agree, this revision did not get made for the 60%, piping and valves will be shown on a pad adjacent to the pump station similar to the PD and SS pump stations M Wilson 7/26/2021 5:05 Unchecked 1661 Markup Text I-618-85 IS REDUCTION FROM 14" TO 12" OKAY? MWalkowiak 6/28/2021 15:18 Unchecked 1662 Re: Markup Text I-618-85 yes, the headloss associated with this small run of 12" is not excessive and this is the overflow from the centrate wetwells and should not be used on a regular basis M Wilson 7/26/2021 5:06 Unchecked 1664 Markup Callout I-618-85 VENT SIZE SEEMS SMALL COMPARED TO INFLUENT PIPES MWalkowiak 6/28/2021 15:21 Unchecked 1665 Re: Markup Callout I-618-85 The vent only deals with the change in elevation of the wetwell, which is small for this pump station. Will review to confirm. M Wilson 7/11/2021 16:34 Unchecked 1667 Markup Callout I-618-85 WHAT IS THIS? NOT IN LEGEND. MWalkowiak 6/28/2021 15:25 Unchecked 1668 Re: Markup Callout I-618-85 A manual vent. Will correct symbology M Wilson 8/3/2021 4:46 Unchecked 1669 Callout I-618-85 Temperature and leak detection? PMurphy 8/9/2021 14:57 Checked 1670 Re: Callout I-618-85 Noted, will be provide if available for the size pumps being used. M Wilson 8/3/2021 12:50 Unchecked 1671 Callout I-618-85 If both pumps are called to run during a storm event it would be lead/lag? pmatkinson 8/11/2021 16:12 Checked 1672 Re: Callout I-618-85 Yes, they could both be called for service if the water level reached the standby pump levels M Wilson 8/3/2021 12:51 Unchecked 1673 Callout I-618-85 Are the floats physically near to the cover? pmatkinson 8/11/2021 16:12 Checked 1674 Re: Callout I-618-85 Not necessarily, but the P&ID is not a dimensional drawing, refer to the Civil drawings for the physical arrangements M Wilson 7/26/2021 5:08 Unchecked 1675 Text Box I-618-85 Sharik C: LowLow switch status not brought to DCS. AndyW 8/16/2021 14:24 Checked 1676 Re: Text Box I-618-85 this can be brought to the DCS if desired M Wilson 8/3/2021 12:58 Unchecked 1677 Text Box I-618-85 Sharik C: Level setpoints are missing. AndyW 8/16/2021 14:24 Checked 1678 Re: Text Box I-618-85 Setpoints will be shown on the Final design M Wilson 8/3/2021 12:55 Unchecked 1679 Text Box I-618-85 Sharik C: Level feedback is missing. AndyW 8/16/2021 14:25 Checked 1680 Re: Text Box I-618-85 High High alarms are provided M Wilson 8/3/2021 12:57 Unchecked 1681 Text Box I-618-85 Sharik C: Missing alarms for Motor Casing, discharge pressure etc. AndyW 8/16/2021 14:25 Checked 1682 Re: Text Box I-618-85 Will verify with mfgr's specified and provide if available. If not a common alarm may be the way to go. M Wilson 8/3/2021 17:37 Unchecked 1683 Text Box I-618-85 Sharik C: Missing E-stop. AndyW 8/16/2021 14:25 Checked 1684 Re: Text Box I-618-85 E-Stop will be added to the panel M Wilson 8/6/2021 12:02 Unchecked 1687 Text Box I-619-85 Can these level devices be read from ground level? (tanks are very tall) bpetrik 8/5/2021 9:01 Checked 1688 Re: Text Box I-619-85 Yes, you can read them from the ground. ove51156 7/21/2021 12:51 Unchecked 1690 Markup Callout I-619-85 IS PI NEEDED WITH ADJACENT TANK LI? MWalkowiak 7/19/2021 13:19 Unchecked 1691 Re: Markup Callout I-619-85 This gauge would be used for pump maintenance, not necessarily tank elevation M Wilson 7/11/2021 16:35 Unchecked 1693 Markup Callout I-619-85 IS PI NEEDED WITH ADJACENT TANK LI? MWalkowiak 7/19/2021 13:20 Unchecked 1694 Re: Markup Callout I-619-85 This gauge would be used for pump maintenance, not necessarily tank elevation M Wilson 7/11/2021 16:36 Unchecked 1696 Markup Callout I-619-85 IS THIS PIPE NECESSARY? MWalkowiak 6/28/2021 15:42 Unchecked 1697 Re: Markup Callout I-619-85 Yes, to allow for tank to tank transfer from recirc pumps. ove51156 7/21/2021 12:50 Unchecked 1699 Markup Callout I-619-85 IS THIS PIPE NECESSARY? MWalkowiak 6/28/2021 15:42 Unchecked 1700 Re: Markup Callout I-619-85 Yes, see response for Tank 1 M Wilson 7/26/2021 5:10 Unchecked 1702 Markup Callout I-619-85 SINGLE POINT OF FAILURE. CONSIDER ROUTING TWO PARALLLEL LINES TO BLENDERS. MWalkowiak 6/28/2021 15:44 Unchecked 1703 Re: Markup Callout I-619-85 Header will be added to provide redundancy. ove51156 7/22/2021 12:50 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1705 Markup Callout I-619-85 NO SUMP SHOWN ON STRUCTURAL DRAWINGS MWalkowiak 6/28/2021 15:53 Unchecked 1707 Re: Markup Callout I-619-85 Sump is provided, the structural drawings show the grating in the same area, will be clarified for the final design M Wilson 8/3/2021 17:38 Unchecked 1708 Callout I-619-85 No detail referenced, but assume these should correspond to detail K? PMurphy 8/9/2021 14:57 Checked 1709 Re: Callout I-619-85 Will provide reference to specification for device M Wilson 7/30/2021 5:23 Unchecked 1710 Callout I-619-85 No indication anywhere for high temperature, can this be added to SCADA or the MCC for troubleshooting? PMurphy 7/28/2021 11:00 Checked 1711 Re: Callout I-619-85 High temp is integral to the fault signal. ove51156 7/21/2021 12:43 Unchecked 1713 Callout I-619-85 The note infers there may be cable between the LE and LIT or that there is an LT with a remote LI? Either way the depiction as shown does not match that pmatkinson 8/11/2021 16:18 Checked 1714 Re: Callout I-619-85 That is not the intent of that note. The note is for the truck unloading panel, will be deleted from the instrument M Wilson 8/2/2021 9:46 Unchecked 1716 Text Box I-619-85 Sharik C: Automation available on truck fill valves? AndyW 8/16/2021 14:26 Checked 1717 Re: Text Box I-619-85 Truck unloading is a manual operation. ove51156 7/21/2021 12:48 Unchecked 1718 Text Box I-619-85 Sharik C: truck fill valves need valve open/close status. AndyW 8/16/2021 14:26 Checked 1719 Re: Text Box I-619-85 Truck unloading is not automatic. ove51156 7/21/2021 12:49 Unchecked 1720 Text Box I-619-85 Sharik C: provide additional specific faults via modbus. AndyW 8/16/2021 14:26 Checked 1721 Re: Text Box I-619-85 Unsure of what additional specific items are being requested. Dry Run Alarm is for high stator temp, Hi pressure is for high discharge pressure, Fault Overload is for motor overload, there are no other specific faults to be added M Wilson 8/6/2021 12:14 Unchecked 1722 Text Box I-619-85 Sharik C: High temperature alarm AndyW 8/16/2021 14:26 Checked 1723 Re: Text Box I-619-85 Fault/overload provides notification that the pump has failed. ove51156 7/21/2021 12:43 Unchecked 1724 Text Box I-619-85 Sharik C: level switches for polymer storage tank. AndyW 8/16/2021 14:27 Checked 1725 Re: Text Box I-619-85 LIT alarms when the tank is at high level. Level switch would be redundant. ove51156 7/21/2021 12:47 Unchecked 1726 Text Box I-619-85 Sharik C: is LAH10101 considered a leak or overflow alarm? AndyW 8/16/2021 14:27 Checked 1727 Re: Text Box I-619-85 Leak detection and an alarm. ove51156 7/21/2021 12:41 Unchecked 1728 Callout I-619-85 Flow meters? Eric.Hovland 7/20/2021 14:13 Unchecked 1729 Re: Callout I-619-85 Flow meter is not recommend on the suction side of pump. ove51156 7/21/2021 12:22 Unchecked 1731 Callout I-620-85 Two pumps but only one drive, is starter integral to 1/2 hp pump? Are there any SCADA signals from the second pump? PMurphy 8/9/2021 14:58 Checked 1732 Re: Callout I-620-85 Will verify the drives for each pump and revised accordingly M Wilson 8/3/2021 4:43 Unchecked 1735 Markup Callout I-620-85 IS FLAPPER CHECK VALVE APPROPRIATE FOR POLYMER SERVICE? TYP MWalkowiak 7/19/2021 13:21 Unchecked 1736 Re: Markup Callout I-620-85 Should be Ball Check, will adjust the symbol M Wilson 7/11/2021 16:41 Unchecked 1738 Markup Callout I-620-85 SINGLE POINT OF FAILURE MWalkowiak 6/28/2021 16:04 Unchecked 1739 Re: Markup Callout I-620-85 A second pipe from the storage tanks will be added. ove51156 7/22/2021 10:44 Unchecked 1740 Markup Callout I-620-85 SHOULD CHECK VALVE BE UPSTREAM OF CONNECTIONPOINT? TYP MWalkowiak 7/19/2021 13:22 Unchecked 1741 Re: Markup Callout I-620-85 For this particular connection, yes. This is the flushing connection which would be used in conjunction with the flush water from the blender unit, and placement upstream of the check valve will allow for flushing of the entire line M Wilson 7/11/2021 16:42 Unchecked 1743 Markup Text I-620-85 ADD SUMP WITH LEVEL SWITCH IN CONTAINMENT BASIN MWalkowiak 6/28/2021 16:11 Unchecked 1744 Re: Markup Text I-620-85 The sump and the level indication are shown on I-619-85 for this containment area M Wilson 8/2/2021 9:55 Unchecked 1746 Markup Callout I-620-85 NOT CONSISTENT WITH NEXT DRAWING MWalkowiak 6/28/2021 16:19 Unchecked 1747 Re: Markup Callout I-620-85 Think it is clear. Note on the next drawing is indicating a different leader as being inconsistent M Wilson 8/2/2021 9:58 Unchecked 1748 Markup Callout I-620-85 NOT CLEAR. LEADER ON LEFT SIDE OF DRAWING GOES TO BLENDERS 3 & 4 MWalkowiak 6/28/2021 16:20 Unchecked 1749 Re: Markup Callout I-620-85 Will coordinate the note on this line as being to the discharge of the feeder blenders M Wilson 8/2/2021 9:59 Unchecked 1751 Markup Callout I-620-85 SHOULD CHECKVALVE MOVE TO PUMP DISCHARGE? MWalkowiak 6/28/2021 16:22 Unchecked 1752 Re: Markup Callout I-620-85 Check valve is not required and will be removed. ove51156 7/21/2021 13:01 Unchecked 1754 Markup Callout I-620-85 IS THIS REDUNDANT VALVE NEEDED? MWalkowiak 6/28/2021 16:23 Unchecked 1755 Re: Markup Callout I-620-85 Valve will be deleted. ove51156 7/21/2021 13:01 Unchecked 1756 Markup Callout I-620-85 SHOULD THIS PRV REGULATE DOWNSTREAM PRESSURE? TYP MWalkowiak 6/28/2021 16:26 Unchecked 1757 Re: Markup Callout I-620-85 This is correct as shown. It provides constant pressure to the system. ove51156 7/22/2021 10:36 Unchecked 1758 Markup Callout I-620-85 IS THIS VALVE NECESSARY? TYP MWalkowiak 6/28/2021 16:26 Unchecked 1759 Re: Markup Callout I-620-85 Yes, manual valves are always provided for isolation. ove51156 7/22/2021 10:37 Unchecked 1760 Callout I-620-85 Is needle valve needed to control the dilution flow rate PMurphy 7/28/2021 11:28 Unchecked 1761 Re: Callout I-620-85 Dilution flow rate is controlled on the skid. ove51156 7/21/2021 12:58 Unchecked 1762 Re: Re: Callout I-620-85 Secondary dilution is set manually, if this valve is how control is set with the rotameter, should it be something easier to control than a ball valve? PMurphy 7/28/2021 11:31 Unchecked 1763 Callout I-620-85 Normally closed, typ PMurphy 7/28/2021 11:00 Checked 1764 Re: Callout I-620-85 Correct, will denote as such M Wilson 7/8/2021 8:17 Unchecked 1765 Callout I-620-85 Comms not included in 46 33 33 PMurphy 8/9/2021 14:58 Checked 1766 Re: Callout I-620-85 Will confirm with specified polymer feeder blender mfgrs and edit spec and/or drawing accordingly M Wilson 8/3/2021 4:57 Unchecked 1767 Text Box I-620-85 Sharik C: Any in line analytical probes to determine diluted polymer concentration? AndyW 8/16/2021 14:27 Checked 1768 Re: Text Box I-620-85 No, the concentration is based on the rates of polymer and dilution water M Wilson 8/3/2021 12:59 Unchecked 1769 Text Box I-620-85 Sharik C: Provide other status and calculations to the DCS via Modbus. AndyW 8/16/2021 14:27 Checked 1770 Re: Text Box I-620-85 Please provide info on what additional info you are requesting. M Wilson 8/3/2021 13:05 Unchecked 1771 Re: Re: Text Box I-620-85 Sharik provided more information regarding this comment in an email that was forwarded to the design team on 8/26/2021. AndyW 8/26/2021 8:55 Unchecked 1772 Text Box I-620-85 Sharik C: Automated sequence programming to align valves for available selected centrifuge. (Operator should only be given a choice of available centrifuge to select from). AndyW 8/16/2021 14:28 Checked 1773 Re: Text Box I-620-85 Polymer feed to centrifuge is directed via manual valves. ove51156 7/21/2021 12:59 Unchecked 1774 I&C I-620-85 NORMALLY CLOSED BUT22066 7/28/2021 11:33 Unchecked 1777 Markup Callout I-621-85 NOT CONSISTENT WITH PREVIOUS DRAWING MWalkowiak 6/28/2021 16:14 Unchecked 1778 Re: Markup Callout I-621-85 Don't see any inconsistencies? M Wilson 7/11/2021 16:44 Unchecked 1780 Markup Callout I-621-85 NOT CLEAR. LEADER ON LEFT SIDE OF DRAWING GOES TO BLENDERS 5 & 6 MWalkowiak 7/19/2021 13:24 Unchecked 1781 Re: Markup Callout I-621-85 One leader is to the suction side of the units, and the other is to the discharge, and both are going to units 5 and 6 M Wilson 7/11/2021 16:46 Unchecked 1782 Markup Text I-621-85 SEE COMMENTS ON I-620-85 MWalkowiak 6/28/2021 16:26 Unchecked 1783 Re: Markup Text I-621-85 See responses on I0620-85 M Wilson 7/26/2021 5:11 Unchecked 1784 Text Box I-621-85 Jonathan T: Same comment for I-620-85: Would like to get some clarifications how the distribution header of the Secondary Dilution Panel works (i.e how to prevent #2 unit's flow going to #3 unit). AndyW 8/16/2021 15:07 Checked 1785 Re: Text Box I-621-85 It is a single water supply to the panel with 8 water connections out; 4 for flushing and 4 for secondary dilution. All lines have isolation valves. ove51156 7/22/2021 12:49 Unchecked 1786 I&C I-621-85 NORMALLY CLOSED BUT22066 7/28/2021 11:35 Unchecked 1788 I&C I-622-85 NORMALLY CLOSED BUT22066 7/28/2021 11:36 Unchecked 1790 Text Box I-623-85 Confirm is bypass is needed around air receiver. (what happens to system if receiver is off-line for maintenance?) bpetrik 6/28/2021 7:19 Unchecked 1791 Re: Text Box I-623-85 A bypass can be added around the receivers. ove51156 7/23/2021 8:30 Unchecked 1794 Markup Callout I-623-85 RECIPROCATING COMPRESSORS ARE NOISY. CAN SCREW COMPRESSORS BE USED INSTEAD? MWalkowiak 6/28/2021 16:33 Unchecked 1795 Re: Markup Callout I-623-85 Based on the information we got from the vendors on the air requirements for the valve screw compressors are to large for this application. ove51156 7/23/2021 10:08 Unchecked 1797 Markup Callout I-623-85 CONSIDER COMPRESSOR PACKAGES WITH INTEGRAL DRYERS RATHER THAN SEPARATE. MWalkowiak 6/28/2021 16:38 Unchecked 1798 Re: Markup Callout I-623-85 This is a recip compressor. Skids with integral dryer are typically screw type. To build a custom skid would be very expensive and would add little to no benefit to the project. ove51156 7/23/2021 10:34 Unchecked 1799 Markup Callout I-623-85 ARE PARTICULATE FILTERS ALSO NEEDED FOR INSTRUMENT AIR QUALITY MWalkowiak 6/28/2021 16:38 Unchecked 1800 Re: Markup Callout I-623-85 Coalescing filters also remove particulates. Additional filters are not needed. ove51156 7/23/2021 10:30 Unchecked 1801 Callout I-623-85 Label as indicator light PMurphy 8/9/2021 14:58 Checked 1802 Re: Callout I-623-85 Noted, will revise M Wilson 8/3/2021 4:53 Unchecked 1804 Callout I-623-85 LOA implies some local controls, would HOA be more appropriate? pmatkinson 8/11/2021 16:20 Checked 1805 Re: Callout I-623-85 LOA is correct, the local control panel will provide local control of the equipment M Wilson 8/3/2021 4:58 Unchecked 1809 Callout I-623-85 Would the compressor panel not be part of this package also and the package boundaries reflect it? pmatkinson 8/11/2021 16:20 Checked 1810 Re: Callout I-623-85 yes, refer to the specifications for the details on the scope of the package from the vendor M Wilson 7/26/2021 5:14 Unchecked 1811 Text Box I-623-85 Sharik C: No DCS control? AndyW 8/16/2021 15:07 Checked 1812 Re: Text Box I-623-85 No, this is a packaged compressed air system. BUT22066 8/3/2021 7:46 Unchecked 1813 Text Box I-623-85 Sharik C: Lead / Lag Compressor status. AndyW 8/16/2021 15:07 Checked 1814 Re: Text Box I-623-85 Lead/Lag status will be provided. BUT22066 8/3/2021 7:47 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1815 Cloud+ I-623-85 Redundancy needed Eric.Hovland 7/20/2021 14:19 Unchecked 1816 Re: Cloud+ I-623-85 Redundancy is provided at the compressors, other components are not as prone to the same failures, and or have bypasses to allow for operation. M Wilson 7/26/2021 5:15 Unchecked 1817 Text Box I-623-85 PROVIDE PAHH, PAH, PAL, PALL ALARMS BUT22066 7/28/2021 11:43 Unchecked 1820 Text Box I-624-85 Provide ability to readily install a shutoff damper in the future when odor treatment is needed bpetrik 6/28/2021 7:24 Unchecked 1821 Re: Text Box I-624-85 A flange will be added to allow for removal of the stack in the future. Damper or blind flange could be added to the flange. ove51156 7/23/2021 6:02 Unchecked 1822 Callout I-624-85 Are these fans used for area declassification under NFPA 820? If so do fault signals need to be ties into a go/no-go indication system for declassified areas to indicate if sufficient air changes are not being achieved for declassification? PMurphy 7/28/2021 11:01 Checked 1823 Re: Callout I-624-85 Will be updated at 90% with all code requirements. ove51156 7/23/2021 5:55 Unchecked 1824 Text Box I-624-85 Sharik C: Differential Pressure signal. AndyW 8/16/2021 15:07 Checked 1826 Re: Text Box I-624-85 Fans are provided with a differential pressure indicator, and a low differential pressure switch with notification on low differential pressure at the DCS level. Monitoring of the differential pressure for a system of this type is not necessary M Wilson 8/6/2021 12:08 Unchecked 1827 Text Box I-624-85 Sharik C: Exhaust fan blending fresh air with foul air? AndyW 8/16/2021 15:08 Checked 1828 Re: Text Box I-624-85 No the air is pulled from the spaces and exhausted. There is no mixing. ove51156 7/23/2021 5:56 Unchecked 1829 Callout I-624-85 If declassified with fans does that mean system shuts down when fans turn off? Eric.Hovland 7/20/2021 14:21 Unchecked 1830 Re: Callout I-624-85 No, code requires an alarm not the system to shut down. ove51156 7/23/2021 6:18 Unchecked 1832 Callout I-625-85 Float not shown PMurphy 7/28/2021 11:01 Checked 1833 Re: Callout I-625-85 Float will be added M Wilson 7/26/2021 5:16 Unchecked 1834 Callout I-625-85 Lag? PMurphy 8/9/2021 15:02 Checked 1835 Re: Callout I-625-85 This is essentially how it operates M Wilson 8/2/2021 9:12 Unchecked 1836 Re: Re: Callout I-625-85 Since pumps alternate and the second pump starts automatically "lead" and "lag" are the correct descriptions. Ensure this is coordinated with the control strategy. PMurphy 8/9/2021 15:02 Checked 1837 Callout I-625-85 Lead? PMurphy 8/9/2021 15:02 Checked 1838 Re: Callout I-625-85 This is essentially how it operates M Wilson 8/2/2021 9:13 Unchecked 1839 Re: Re: Callout I-625-85 Since pumps alternate and the second pump starts automatically "lead" and "lag" are the correct descriptions. Ensure this is coordinated with the control strategy. PMurphy 8/9/2021 15:02 Checked 1840 Callout I-625-85 moisture and temperature switches? PMurphy 8/13/2021 9:53 Checked 1841 Re: Callout I-625-85 Noted, will verify availability of the moisture detection with the size pumps for the system and provide if available. M Wilson 8/2/2021 9:27 Unchecked 1842 Text Box I-625-85 Sharik C: Low Level Alarm Missing. AndyW 8/16/2021 15:08 Checked 1843 Re: Text Box I-625-85 Low level alarm will be provided. BUT22066 8/3/2021 7:48 Unchecked 1844 Text Box I-625-85 Sharik C: Local, Auto missing. AndyW 8/16/2021 15:08 Checked 1845 Re: Text Box I-625-85 In-Auto will be provided. BUT22066 8/3/2021 7:48 Unchecked 1846 Text Box I-625-85 Sharik C: Level of DCS control? AndyW 8/16/2021 15:08 Checked 1847 Re: Text Box I-625-85 There is no DCS control. This is similar to a duplex sump pump system. BUT22066 8/3/2021 7:48 Unchecked 1848 Text Box I-625-85 Sharik C: Missing Ready Signal. AndyW 8/16/2021 15:09 Checked 1849 Re: Text Box I-625-85 Ready signal will be added. BUT22066 8/3/2021 7:49 Unchecked 1850 Text Box I-625-85 Sharik C: Missing Level switch high / low to DCS. AndyW 8/16/2021 15:09 Checked 1851 Re: Text Box I-625-85 High and low switches will be added. BUT22066 8/3/2021 7:49 Unchecked 1852 Text Box I-625-85 Sharik C: Vent valve feedback needed. AndyW 8/16/2021 15:09 Checked 1853 Re: Text Box I-625-85 There is no valve on the vent. BUT22066 8/3/2021 7:49 Unchecked 1854 Callout I-625-85 Unlike storm water this would need a level indication style level sensor with level feedback to DCS. Eric.Hovland 7/20/2021 14:23 Unchecked 1855 Re: Callout I-625-85 I can see the need for a high alarm, but why a continuous level indication? City to provide direction on desired device here. M Wilson 7/26/2021 5:18 Unchecked 1856 Cloud+ I-625-85 Are pumps switched between which is lead and which is lag on a consistant basis? Eric.Hovland 7/20/2021 14:23 Unchecked 1857 Re: Cloud+ I-625-85 Yes, there would be an alternator to switch operating pumps M Wilson 7/26/2021 5:19 Unchecked 1858 Callout I-625-85 Can you make this a PIT? Eric.Hovland 7/20/2021 14:25 Unchecked 1859 Re: Callout I-625-85 It can be, but it does not seem necessary to monitor the pressure of thee pumps. If City desires it, it can be changed M Wilson 7/26/2021 5:25 Unchecked 1861 Callout I-626-85 Float not shown PMurphy 7/28/2021 11:01 Checked 1862 Re: Callout I-626-85 Float will be added M Wilson 7/26/2021 5:26 Unchecked 1863 Text Box I-626-85 Provide cleanouts, as needed bpetrik 7/28/2021 11:36 Checked 1864 Re: Text Box I-626-85 Noted, a cleanout connection will be shown M Wilson 7/26/2021 5:26 Unchecked 1865 Text Box I-626-85 Confirm is vent line tied into plumbing vent system bpetrik 7/28/2021 11:36 Checked 1866 Re: Text Box I-626-85 Confirmed, refer to Civil plans for pump station details which call out routing of the vent to the building vent system M Wilson 7/8/2021 5:09 Unchecked 1867 Callout I-626-85 Lag? PMurphy 8/9/2021 15:02 Checked 1868 Re: Callout I-626-85 will review and coordinate with specifications to show as lead/lag M Wilson 7/30/2021 5:24 Unchecked 1869 Callout I-626-85 Lead? PMurphy 8/9/2021 15:02 Checked 1870 Re: Callout I-626-85 will review and coordinate with specifications to show as lead/lag M Wilson 7/30/2021 5:25 Unchecked 1871 Callout I-626-85 moisture and temperature switches? PMurphy 8/9/2021 15:02 Checked 1872 Re: Callout I-626-85 I will coordinate with the Mech. Eng. and revise as required. These are basically duplex sump pumps. BUT22066 8/3/2021 7:55 Unchecked 1873 Text Box I-626-85 Sharik C: Missing level switch for high / low for Level indication. AndyW 8/16/2021 15:09 Checked 1874 Re: Text Box I-626-85 high and low switches will be added. BUT22066 8/3/2021 7:54 Unchecked 1875 Text Box I-626-85 Sharik C: Missing Low Low to DCS. AndyW 8/16/2021 15:10 Checked 1876 Re: Text Box I-626-85 low-low will be added. BUT22066 8/3/2021 7:53 Unchecked 1877 Text Box I-626-85 Sharik C: Missing Local, auto, running. AndyW 8/16/2021 15:10 Checked 1878 Re: Text Box I-626-85 Auto and ready will be added. There is no local mode only test and running is provided. BUT22066 8/3/2021 7:53 Unchecked 1879 Text Box I-626-85 Sharik C: Provide vent feedback. AndyW 8/16/2021 15:10 Checked 1880 Re: Text Box I-626-85 There is no vent valve as the air goes to the plumbing vent system. BUT22066 8/3/2021 7:54 Unchecked 1881 Text Box I-626-85 See comments from I-615-85 Eric.Hovland 7/20/2021 14:25 Unchecked 1882 Re: Text Box I-626-85 Noted, see responses to individual comments on that sheet M Wilson 8/2/2021 10:15 Unchecked 1884 Callout I-627-85 No isolation? Typical all pressure instruments PMurphy 6/25/2021 10:22 Unchecked 1885 Re: Callout I-627-85 Refer to instrument details for isolation valves for instruments M Wilson 7/26/2021 5:27 Unchecked 1886 Re: Re: Callout I-627-85 Isolation is shown on other pressure instruments throughout the set, recommend that this be consistent PMurphy 7/28/2021 11:03 Unchecked 1887 Callout I-627-85 Normally closed PMurphy 7/28/2021 11:03 Checked 1888 Re: Callout I-627-85 Noted, will be designated as such M Wilson 7/8/2021 8:25 Unchecked 1889 Callout I-627-85 No SCADA indication? PMurphy 8/9/2021 15:03 Checked 1890 Re: Callout I-627-85 No, this should not be necessary for this system M Wilson 8/3/2021 4:39 Unchecked 1892 Text Box I-627-85 confirm need for typ. devices on tank - PRVs, PI, level, etc. bpetrik 7/28/2021 11:37 Checked 1893 Re: Text Box I-627-85 Will add a PI. Other items are not required. ove51156 7/23/2021 10:57 Unchecked 1894 Callout I-627-85 Low PMurphy 8/9/2021 15:03 Checked 1895 Re: Callout I-627-85 Noted, will be corrected M Wilson 8/2/2021 9:40 Unchecked 1896 Callout I-627-85 Is there a pressure source for this? Is this a hydraulic link? PMurphy 7/28/2021 11:04 Checked 1897 Re: Callout I-627-85 Will correct nomenclature for the valve provided. This is either a mechanical float operated valve or a hydraulic sensed valve, no external pressure is required M Wilson 7/26/2021 5:29 Unchecked 1898 Callout I-627-85 Full seal water detail with low flow detection? PMurphy 7/28/2021 11:04 Checked 1899 Re: Callout I-627-85 This is a packaged system. Detail will be provided by the vendor during shop drawing review. ove51156 7/23/2021 10:18 Unchecked 1900 Callout I-627-85 Sharik C: Clarify function and operation of the pressure retention tank. AndyW 8/16/2021 15:10 Checked 1901 Re: Callout I-627-85 The system has a pressure range it can operate over. The pumps supply water to the system and pressure the tank. Then turn off. If a small amount of water is need the storage in the tank is used. This helps reduce the quick start and stops on the pumps. ove51156 7/23/2021 12:58 Unchecked 1902 Text Box I-627-85 Sharik C: Provide pump runtime hours to DCS. AndyW 7/13/2021 7:42 Unchecked 1903 Re: Text Box I-627-85 The City previously said to delete all run times as they are DCS generated. BUT22066 8/3/2021 7:56 Unchecked 1904 Callout I-627-85 Needs redundancy Eric.Hovland 7/20/2021 14:27 Unchecked 1905 Re: Callout I-627-85 The system can operate without this tank. Redundant tanks is not required. ove51156 7/23/2021 12:55 Unchecked 1906 Callout I-627-85 Flow meter? Eric.Hovland 7/20/2021 14:28 Unchecked 1907 Re: Callout I-627-85 Flow metering to be shown elsewhere. No flowmeter would be required as a part of this system M Wilson 7/26/2021 5:31 Unchecked 1910 Callout I-627-85 Automated? Eric.Hovland 7/20/2021 14:30 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 1911 Re: Callout I-627-85 See comment on sensing line M Wilson 7/26/2021 5:31 Unchecked 1912 Callout I-627-85 Bypass for maintenance or redundancy Eric.Hovland 7/20/2021 14:30 Unchecked 1913 Re: Callout I-627-85 Air gap is required to protect the W1 system. A bypass line would be against code. ove51156 7/23/2021 10:17 Unchecked 1916 Callout I-627-85 For all pumps: Are these valves automated and are they part of the permissives for the pumps? Eric.Hovland 7/20/2021 14:32 Unchecked 1917 Re: Callout I-627-85 These are manual valves that are provided to isolate the pumps for maintenance. ove51156 7/23/2021 10:19 Unchecked 1919 Text Box I-627-85 Provide lead, lag, backup, information and timing for rotation of which pump is which. Eric.Hovland 7/20/2021 14:34 Unchecked 1920 Re: Text Box I-627-85 this information is typically provided in the specs for the equipment. Switching between lead and lag can be set up in the DCS M Wilson 8/2/2021 10:17 Unchecked 1926 Callout L-502-85 Jose C - male galvanized nipple can not be inserted to female pvc (plastic fittings) Aric 7/6/2021 16:02 Unchecked 1927 Re: Callout L-502-85 As noted in the meeting on 7/9/21 the female coupling will be revised to steel to allow for the transition M Wilson 7/11/2021 10:50 Unchecked 1931 Text Box M-001-00 Jose C. - What code cycle is being used? Please detail the description of work Aric 7/6/2021 16:57 Unchecked 1932 Re: Text Box M-001-00 Note 2 on this sheet indicates the Codes that the design is based on. M Wilson 7/8/2021 5:28 Unchecked 1934 QC Reviewer Cloud+Comment: Cloud+Comment added M-101-84 Correct spelling. Dan Stewart 6/24/2021 6:19 Unchecked 1935 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-101-84 Spelling will be checked and corrected M Wilson 7/23/2021 4:31 Unchecked 1936 QC Reviewer Cloud+Comment: Cloud+Comment added M-101-84 Where is this in relation to the Dewatering Building? Add area plan Dan Stewart 6/24/2021 6:25 Unchecked 1937 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-101-84 Building is in the Triangle area as indicated on the Civil plans M Wilson 7/23/2021 4:32 Unchecked 1938 Cloud+ M-101-84 condensate to be done as per city's detail and tonnage. Aric 7/6/2021 17:01 Unchecked 1939 Re: Cloud+ M-101-84 Will review City's detail and adjust our detail accordingly M Wilson 7/11/2021 15:58 Unchecked 1943 QC Reviewer Callout: Comment added M-101-85-1 Add part plan callouts Dan Stewart 6/24/2021 6:19 Unchecked 1944 Re: QC Reviewer Callout: Comment added M-101-85-1 Noted, callouts to plan sheets to be added M Wilson 7/23/2021 4:33 Unchecked 1945 QC Reviewer Cloud+Comment: Cloud+Comment added M-101-85-1 Add area plan Dan Stewart 6/24/2021 6:19 Unchecked 1946 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-101-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:34 Unchecked 1947 Cloud+ M-101-85-1 Jose C. - all thermostats to be set at 48" to controls if required to be accessible. Aric 7/6/2021 17:06 Unchecked 1948 Re: Cloud+ M-101-85-1 Any process area heaters will be set to 48 deg F, unless space has special temp req's. Heaters will be removed from electrical room. can33158 7/23/2021 11:15 Unchecked 1949 Cloud+ M-101-85-1 Jose C. - Provide Details Aric 7/12/2021 14:01 Unchecked 1950 Re: Cloud+ M-101-85-1 See enlarged plans. can33158 7/23/2021 11:16 Unchecked 1951 Callout M-101-85-1 Jose C. - complete page, label all, CFM, Condensates(sizes-termination), condenser lines Aric 7/12/2021 14:01 Unchecked 1952 Re: Callout M-101-85-1 See enlarged plans. can33158 7/23/2021 11:16 Unchecked 1953 Cloud+ M-101-85-1 Jose C. - If rated, then provide fire damper Aric 7/12/2021 14:02 Unchecked 1954 Re: Cloud+ M-101-85-1 Stair is not enclosed and is open to lobby, it is not an Exit Enclosure. can33158 7/23/2021 11:17 Unchecked 1955 Cloud+ M-101-85-1 Jose C. - Complete page with CFM's. Balance system Aric 7/12/2021 14:02 Unchecked 1956 Re: Cloud+ M-101-85-1 See enlarged plans. can33158 7/23/2021 11:18 Unchecked 1957 Cloud+ M-101-85-1 Jose C. - Equipment in elevator equipment room must be elevator equipment only. HVAC mechanic not allowed unless accompanied by someone with correct credentials. Aric 7/12/2021 14:01 Unchecked 1958 Re: Cloud+ M-101-85-1 Understood, will keep any HVAC equipment needing maintenance/repair out of elev control room as much as possible. can33158 7/23/2021 11:24 Unchecked 1960 QC Reviewer Cloud+Comment: Cloud+Comment added M-102-85-1 Add area plan Dan Stewart 6/24/2021 6:19 Unchecked 1961 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-102-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:36 Unchecked 1962 QC Reviewer Cloud+Comment: Cloud+Comment added M-102-85-1 The view range seems off. Since this is a low roof, the doors should not show up. Would it make sense to show this low room on sheet M-103-85-1 with the other roof equipment? Dan Stewart 6/24/2021 10:54 Unchecked 1963 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-102-85-1 The roof of the electrical room is at roughly the same elevation as the upper floor of the centrifuge floor which is why it is show here. M Wilson 6/30/2021 13:57 Unchecked 1964 QC Reviewer Callout: Comment added M-102-85-1 Add part plan callouts Dan Stewart 6/24/2021 6:20 Unchecked 1965 Re: QC Reviewer Callout: Comment added M-102-85-1 Callouts to enlarged plans to be added M Wilson 7/23/2021 4:37 Unchecked 1967 QC Reviewer Cloud+Comment: Cloud+Comment added M-103-85-1 Should the low roof be shown here? Dan Stewart 6/24/2021 9:05 Unchecked 1968 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-103-85-1 No. See comment response to same subject on Sheet M-102-85-1 M Wilson 6/30/2021 14:01 Unchecked 1969 QC Reviewer Cloud+Comment: Cloud+Comment added M-103-85-1 Add area plan Dan Stewart 6/24/2021 6:24 Unchecked 1970 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-103-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:36 Unchecked 1972 Re: Image M-103-85-1 Noted. Thanks for the detail. can33158 7/23/2021 14:27 Unchecked 1974 Cloud+ M-103-85-1 Jose C. - all equipment to be 6' away from edge or provide railing or other approved safety devices. Aric 7/12/2021 14:03 Unchecked 1975 Re: Cloud+ M-103-85-1 All equipment will be at least 10 feet (BV std) from an unprotected roof edge. Parapets meeting min height are expected here. can33158 7/23/2021 11:26 Unchecked 1976 Cloud+ M-103-85-1 Jose C - provide elevation drawing for ducts on the roof. Aric 7/12/2021 14:04 Unchecked 1977 Re: Cloud+ M-103-85-1 Will provide in next stage of design. can33158 7/23/2021 11:27 Unchecked 1978 Cloud+ M-103-85-1 Jose C. - show size Aric 7/12/2021 14:04 Unchecked 1979 Re: Cloud+ M-103-85-1 Size will vary based on supplier of equipment, typically it's been no issue and contractor understands to connect from equipment to size indicated at duct. can33158 7/23/2021 11:28 Unchecked 1981 QC Reviewer Cloud+Comment: Cloud+Comment added M-104-85-2 Where is this in relation to the Dewatering Building? Add area plan Dan Stewart 6/24/2021 6:25 Unchecked 1982 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-104-85-2 Building is adjacent to the Dewatering Building. Refer to Civil plans for orientation of the facilities M Wilson 7/23/2021 4:39 Unchecked 1983 QC Reviewer Callout: Comment added M-104-85-2 Should a duct smoke detector be shown here? Will area detectors eliminate a duct detector? Dan Stewart 6/24/2021 6:29 Unchecked 1984 Re: QC Reviewer Callout: Comment added M-104-85-2 Area detection will provide shutdown for smoke control. Duct detector not required. can33158 6/30/2021 12:52 Unchecked 1985 Callout M-104-85-2 Jose C - what's type of refrigerant, amount and room size? must meet chapter 11 CMC Aric 7/12/2021 14:08 Unchecked 1986 Re: Callout M-104-85-2 Likely R-410A. Size of room vs refrigerant amount will be verified to meet code. can33158 7/23/2021 11:29 Unchecked 1987 Cloud+ M-104-85-2 Jose C -what is the purpose of this room? Aric 7/12/2021 14:09 Unchecked 1988 Re: Cloud+ M-104-85-2 This is the truck loadout control room for operators and truck drivers to go to for loading dewatered cake to the trucks M Wilson 7/23/2021 4:40 Unchecked 1989 Callout M-104-85-2 Jose C - Wher is the condensate going? Aric 7/12/2021 14:09 Unchecked 1990 Re: Callout M-104-85-2 Condensate will be routed to the floor drain system in the truck loading area that is located below the floor level M Wilson 7/23/2021 4:41 Unchecked 1992 QC Reviewer Cloud+Comment: Cloud+Comment added M-401-85-1 Add area plan Dan Stewart 6/24/2021 6:19 Unchecked 1993 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-401-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:41 Unchecked 1994 QC Reviewer Callout: Comment added M-401-85-1 Should a duct smoke detector be shown here? Will area detectors eliminate a duct detector? Dan Stewart 6/24/2021 6:29 Unchecked 1995 Re: QC Reviewer Callout: Comment added M-401-85-1 Area detection will provide shutdown for smoke control. Duct detector not required. can33158 6/30/2021 12:52 Unchecked 1996 QC Reviewer Callout: Comment added M-401-85-1 Call out where these ducts come from. Dan Stewart 6/24/2021 6:40 Unchecked 1997 Re: QC Reviewer Callout: Comment added M-401-85-1 Will add notation. can33158 6/30/2021 12:53 Unchecked 1998 QC Reviewer Callout: Comment added M-401-85-1 Are unit heaters needed in an electrical room in this region? Dan Stewart 6/24/2021 6:45 Unchecked 1999 Re: QC Reviewer Callout: Comment added M-401-85-1 Can remove if heating not desired. can33158 6/30/2021 12:56 Unchecked 2000 QC Reviewer Callout: Comment added M-401-85-1 Call out where these come from. (typ) Dan Stewart 6/24/2021 6:58 Unchecked 2001 Re: QC Reviewer Callout: Comment added M-401-85-1 Will add notation. can33158 6/30/2021 12:53 Unchecked 2002 QC Reviewer Cloud+Comment: Cloud+Comment added M-401-85-1 Locate note to correct location. Dan Stewart 6/24/2021 7:11 Unchecked 2003 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-401-85-1 Note will be moved to the appropriate location M Wilson 7/23/2021 4:42 Unchecked 2004 Cloud+ M-401-85-1 Jose C - complete page, show all cfms, condensate line sizes, show all condensate lines (wall hung units), provide all refrigerant type and amounts for each room, provide details of bathroom exhaust and make up air. Note: condensate or plumbing lines not allowed above switch gear (electrical). Aric 7/12/2021 14:11 Unchecked 2005 Re: Cloud+ M-401-85-1 Air flow is currently indicated. The balance of the information will be provided in the next stage of design. We are assuming maximum refrigerant amounts are the intent, since this will vary between manufacturers and with line routing. can33158 7/23/2021 11:32 Unchecked 2007 QC Reviewer Cloud+Comment: Cloud+Comment added M-402-85-1 Add area plan Dan Stewart 6/24/2021 6:19 Unchecked 2008 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-402-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:43 Unchecked 2009 QC Reviewer Callout: Comment added M-402-85-1 Should a duct smoke detector be shown here? Will area detectors eliminate a duct detector? Dan Stewart 6/24/2021 6:29 Unchecked 2010 Re: QC Reviewer Callout: Comment added M-402-85-1 Area detection will provide shutdown for smoke control. Duct detector not required. can33158 6/30/2021 12:57 Unchecked 2011 QC Reviewer Cloud+Comment: Cloud+Comment added M-402-85-1 Should these elements be screened? Dan Stewart 6/24/2021 6:43 Unchecked 2012 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-402-85-1 Yes, this will be corrected for the final design M Wilson 7/23/2021 4:43 Unchecked 2013 QC Reviewer Text Box: Comment added M-402-85-1 Does this room require exhaust? Dan Stewart 6/24/2021 7:38 Unchecked 2014 Re: QC Reviewer Text Box: Comment added M-402-85-1 Air conditioning is provided. Outside air will be provided to ensure proper ventilation. can33158 6/30/2021 12:58 Unchecked 2015 QC Reviewer Text Box: Comment added M-402-85-1 Does this room require exhaust? Dan Stewart 6/24/2021 7:39 Unchecked 2016 Re: QC Reviewer Text Box: Comment added M-402-85-1 Air conditioning is provided. Outside air will be provided to ensure proper ventilation. can33158 6/30/2021 12:59 Unchecked 2017 Cloud+ M-402-85-1 Jose C - how is this room being balanced? Will it need exhaust? Aric 7/12/2021 14:14 Unchecked 2018 Re: Cloud+ M-402-85-1 It is part of the larger dewatering room. It's a Maintenance Area within the Dewatering Room. can33158 7/23/2021 11:34 Unchecked 2019 Cloud+ M-402-85-1 Jose C - If penetrating a rated partition, then it will require a fire damper. Aric 7/12/2021 14:15 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 2020 Re: Cloud+ M-402-85-1 Not rated and not enclosed. Open to Hall/Lobby can33158 7/23/2021 11:34 Unchecked 2021 Cloud+ M-402-85-1 Jose C - size of condensate line?. Aric 7/12/2021 14:16 Unchecked 2022 Re: Cloud+ M-402-85-1 Will provide in next stage of design. can33158 7/23/2021 11:34 Unchecked 2023 Cloud+ M-402-85-1 Jose C - provide transfer Aric 7/12/2021 14:17 Unchecked 2024 Re: Cloud+ M-402-85-1 Will provide in next stage of design. can33158 7/23/2021 11:35 Unchecked 2025 Text Box M-402-85-1 Jose C - under cut doors are only allowed to 80 CFM. Please balance all rooms. Aric 7/12/2021 14:17 Unchecked 2026 Re: Text Box M-402-85-1 Understood, will comply. Transfer grilles (or other means) will be provided where flow exceeds 80 cfm. can33158 7/23/2021 14:28 Unchecked 2027 Cloud+ M-402-85-1 Jose C - Provide information of what is being stored. If any chemicals are being stored, then exhaust will be required. Aric 7/12/2021 14:18 Unchecked 2028 Re: Cloud+ M-402-85-1 Will coordinate with Architects. can33158 7/23/2021 11:36 Unchecked 2029 Cloud+ M-402-85-1 ose C - How high from grade is the termination of the exhaust? Provide elevation. Aric 7/12/2021 14:19 Unchecked 2030 Re: Cloud+ M-402-85-1 Will provide elevation and that elevation will meet requirements of Mech Code. can33158 7/23/2021 11:37 Unchecked 2032 QC Reviewer Cloud+Comment: Cloud+Comment added M-403-85-1 Add area plan Dan Stewart 6/24/2021 6:19 Unchecked 2033 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-403-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 8/2/2021 10:18 Unchecked 2034 QC Reviewer Cloud+Comment: Cloud+Comment added M-403-85-1 This is really the electrical room roof plan. Adjust view range to show only the roof and equipment - the doors should not be on this view - or show the equipment on sheet M-103-85-1. Dan Stewart 6/24/2021 10:57 Unchecked 2035 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-403-85-1 The roof of the electrical room is just about the same height as the floor of the centrifuge room which is why it's shown here as it is. M Wilson 6/30/2021 14:06 Unchecked 2036 QC Reviewer Callout: Comment added M-403-85-1 Is this a fume hood? 1000 cfm for a 4' hoods seems high. Does the fan run continuously? Dan Stewart 6/24/2021 7:36 Unchecked 2037 Re: QC Reviewer Callout: Comment added M-403-85-1 1000 cfm is typical for fume hoods, flow will be adjusted based on final hood selection.Fan will run continously to ensure good air quality in lab and remainder of building. can33158 6/30/2021 13:01 Unchecked 2038 QC Reviewer Callout: Comment added M-403-85-1 How is the space's temperature + pressure controlled? There is no VAV with reheat and 1220 CFM SA > 1000 CFM EA, lab will be positive pressure. Will space subcool? Is positive pressure acceptable to the owner? Dan Stewart 6/24/2021 7:47 Unchecked 2039 Re: QC Reviewer Callout: Comment added M-403-85-1 System will be modified to provide for temperature and pressure control. can33158 6/30/2021 13:12 Unchecked 2040 QC Reviewer Callout: Comment added M-403-85-1 Does the RD just open up to the ceiling plenum? Dan Stewart 6/24/2021 7:38 Unchecked 2041 Re: QC Reviewer Callout: Comment added M-403-85-1 Correct, plenum return type system. No return duct. can33158 6/30/2021 13:12 Unchecked 2042 Cloud+ M-403-85-1 Jose C -If condensate lines are below roof, then they must not be above switch gear (electrical). Aric 7/12/2021 14:20 Unchecked 2043 Re: Cloud+ M-403-85-1 Noted, refer to Sheet 401-85-1 that shows the routing of the lines to be in areas that are not above electrical equipment M Wilson 7/23/2021 4:45 Unchecked 2044 Cloud+ M-403-85-1 Jose C - how will this room get balanced? 1210 cfm supply, exhaust? Aric 7/12/2021 14:20 Unchecked 2045 Re: Cloud+ M-403-85-1 Through fume hood that will be shown in next stage of design. can33158 7/23/2021 11:39 Unchecked 2047 QC Reviewer Cloud+Comment: Cloud+Comment added M-404-85-1 Add area plan Dan Stewart 6/24/2021 6:19 Unchecked 2048 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-404-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:46 Unchecked 2049 QC Reviewer Callout: Comment added M-404-85-1 Should this space have a return? 1290 cfm SA > 1000 cfm EA. Is pos press acceptable? Dan Stewart 6/24/2021 7:49 Unchecked 2050 Re: QC Reviewer Callout: Comment added M-404-85-1 Exhaust will be increased to ensure air is not recirculated per SJ design standards. can33158 6/30/2021 13:14 Unchecked 2051 QC Reviewer Cloud+Comment: Cloud+Comment added M-404-85-1 Will there be a chase dn? Will there need to be F/S dampers? Dan Stewart 6/24/2021 7:50 Unchecked 2052 Re: QC Reviewer Cloud+Comment: Cloud+Comment added M-404-85-1 A chase is not required. A floor opening will be provided. Fire dampers will be provided at all fire walls and floors, this is not fire rated due to many openings between the first and second floor. can33158 6/30/2021 13:18 Unchecked 2053 Cloud+ M-404-85-1 Jose C - above ceiling return? Show cfm's Aric 7/12/2021 14:22 Unchecked 2054 Re: Cloud+ M-404-85-1 Return will be plenum type. Ceiling will be perforated architectural type. Will show flow rates in next stage of design. can33158 7/23/2021 11:42 Unchecked 2055 Cloud+ M-404-85-1 Jose C - provide elevation of duct systems. clarify amount of exhaust and supply. Also, show janitor's room size to verify required CFMs Aric 7/12/2021 14:22 Unchecked 2056 Re: Cloud+ M-404-85-1 Duct elevations will be identified in critical locaitons as needed. Otherwise general notes 11, 12, 13 on legend sheet M-001-00. can33158 7/23/2021 11:44 Unchecked 2057 Cloud+ M-404-85-1 Jose C - how is this going to work? Is the stairs rated? Aric 7/12/2021 14:23 Unchecked 2058 Re: Cloud+ M-404-85-1 Stairs are not rated. can33158 7/23/2021 11:44 Unchecked 2060 QC Reviewer Callout: Comment added M-601-00 Is note 1 applicable to a packaged RTU HP? Dan Stewart 6/24/2021 6:55 Unchecked 2061 Re: QC Reviewer Callout: Comment added M-601-00 Will update to Variable Capacity Compressor. can33158 6/30/2021 13:19 Unchecked 2062 QC Reviewer Callout: Comment added M-601-00 Do specs call out to supply to RA/SA smoke detectors? If not, consider adding a note in schecule. Dan Stewart 6/24/2021 7:18 Unchecked 2063 Re: QC Reviewer Callout: Comment added M-601-00 Smoke shutdown will be provided by area smoke detection system. can33158 6/30/2021 13:19 Unchecked 2064 QC Reviewer Callout: Comment added M-601-00 Can the RTU achieve this in the summer with 43% OA? Dan Stewart 6/24/2021 7:43 Unchecked 2065 Re: QC Reviewer Callout: Comment added M-601-00 Will verify and update equipment heating capacity as required. can33158 6/30/2021 13:20 Unchecked 2066 Text Box M-601-00 John L: I do not see any information about the odor control fan Michael C 8/11/2021 15:57 Checked 2067 Re: Text Box M-601-00 Odor control fan information is included in the specifications, refer to specifications for details M Wilson 7/23/2021 4:47 Unchecked 2069 Markup Callout M-603-00 SINGLE FRESH AIR SUPPLY FAN MAY NOT BE COMPLIANT WITH NFPA 820. MWalkowiak 7/19/2021 11:41 Unchecked 2070 Re: Markup Callout M-603-00 Single supply will be sufficient. Redundant fans are not required. NFPA 820 requires mechanical supply and exhaust. Mechanical supply will be provided by MAU. Mechanical exhaust will be mainly provided by EF-2 on roof. can33158 6/30/2021 13:25 Unchecked 2071 Markup Callout M-603-00 SINGLE FRESH AIR SUPPLY FAN MAY NOT BE COMPLIANT WITH NFPA 820. MWalkowiak 7/19/2021 11:41 Unchecked 2072 Re: Markup Callout M-603-00 Single supply will be sufficient. Redundant fans are not required. NFPA 820 requires mechanical supply and exhaust. Mechanical supply will be provided by MAU. Mechanical exhaust will be provided by the odor control fans located at grade between dewatering and truck buildings. can33158 6/30/2021 13:22 Unchecked 2073 Text Box M-603-00 Show balancing dampers and other HVAC items bpetrik 7/28/2021 11:27 Checked 2074 Re: Text Box M-603-00 This is an airflow diagram only, not a process schematic, those types of details are not needed for this diagram. M Wilson 7/15/2021 16:35 Unchecked 2076 Text Box M-603-00 About 3800 cfm is exhausted from FA system - where is this air coming from? bpetrik 6/28/2021 7:52 Unchecked 2077 Re: Text Box M-603-00 This flow will provide negative pressure in the centrifuge area. The MAU and EF-2 will be adjusted to provide slight negative pressure in centrifuge area when combined with this exhaust. can33158 6/30/2021 13:27 Unchecked 2078 Text Box M-603-00 Negative pressure of 2600 CFM sound excessive - confirm pressure on doors bpetrik 6/28/2021 7:52 Unchecked 2079 Re: Text Box M-603-00 This flow will provide negative pressure in the centrifuge area. The MAU and EF-2 will be adjusted to provide slight negative pressure in centrifuge area when combined with this exhaust. can33158 6/30/2021 13:28 Unchecked 2080 Text Box M-603-00 Confirm need for redundant exhaust fan(s). or N/C louvers? bpetrik 8/5/2021 8:48 Checked 2081 Re: Text Box M-603-00 Redundant fans not required by NFPA 820. Please clarify what N/C louvers are. can33158 6/30/2021 13:29 Unchecked 2082 Markup Text M-603-00 CONFIRM THAT AIR BALANCE IS COORDINATED WITH ODOR CONTROL EXHAUST SYSTEM. MWalkowiak 6/28/2021 16:46 Unchecked 2083 Re: Markup Text M-603-00 Specifications will be coordinated. can33158 6/30/2021 13:23 Unchecked 2084 Re: Re: Markup Text M-603-00 The air flow diagram on this drawing should also be coordinated. MWalkowiak 7/19/2021 11:42 Unchecked 2085 Re: Re: Re: Markup Text M-603-00 This was the intent of the previous response M Wilson 7/26/2021 7:58 Unchecked 2087 Markup Callout M-603-00 WHAT IS THE PURPOSE OF THIS FAN? DOES IT SOMEHOW SUPPLEMENT ODOR CONTROL FANS? MWalkowiak 7/19/2021 11:42 Unchecked 2088 Re: Markup Callout M-603-00 It is the main space exhaust fan. Odor control fans only exhaust high odor sources in building, not the general operating space. can33158 6/30/2021 13:26 Unchecked 2089 Text Box M-603-00 John L: The first level seems to be over pressurized and the second level appears to be negatively pressurized. Is this by design? Again I do not see info on the Odor control CFM Michael C 8/11/2021 15:58 Checked 2090 Re: Text Box M-603-00 Notes will be added to provide guidance on the pressurization of the spaces. Numbers are gross values for the equipment which all have the ability to be fine tuned through belt and sheave adjustments. Odor collection information provided on the P&ID's M Wilson 8/3/2021 5:02 Unchecked 2092 Text Box M-604-00 Confirm that heating and cooling is not needed (these elements are not shown on schematic) bpetrik 7/28/2021 11:28 Checked 2093 Re: Text Box M-604-00 Schematic will be updated to show cooling coils, no heating in units. can33158 6/30/2021 13:30 Unchecked 2094 Text Box M-604-00 John L: What is the control scheme for the stand by and running PAH. How does the Smoke exhaust fan - purge mode- work? If the fans put in only outside air, is there a way for them to exhaust? Is that purge mode? Michael C 8/11/2021 15:58 Checked 2095 Re: Text Box M-604-00 A full sequence of operation for the equipment will be provided as a part of the final design. The PAH units will have the ability to balance the OA and RA needs of the space when utilizing the economizer cycle M Wilson 8/3/2021 5:14 Unchecked 2097 QC Reviewer Callout: Comment added P-102-85-1 Can the floor slope be screened? Dan Stewart 6/24/2021 7:52 Unchecked 2098 Re: QC Reviewer Callout: Comment added P-102-85-1 yes, this can be done M Wilson 8/2/2021 10:18 Unchecked 2099 QC Reviewer Cloud+Comment: Cloud+Comment added P-102-85-1 Add area plan Dan Stewart 6/24/2021 10:59 Unchecked 2100 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-102-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:51 Unchecked 2101 QC Reviewer Callout: Comment added P-102-85-1 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 11:01 Unchecked 2102 Re: QC Reviewer Callout: Comment added P-102-85-1 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 4:54 Unchecked 2104 Markup Callout P-102-85-1 FLOOR DRAINS IN CONTAINMENT AREA CAN BE PROBLEMATIC DURING POLYMER SPILL. BETTER TO USE A SUMP WITH LEVEL SWITCH AND MANUAL PUMP. MWalkowiak 6/28/2021 15:49 Unchecked 2105 Re: Markup Callout P-102-85-1 This can be dicussed. Floor drains allow for less dramatic slope (less fill) from one side to the other. can33158 6/30/2021 13:35 Unchecked 2106 Re: Re: Markup Callout P-102-85-1 Polymer spills cannot be allowed to drain from the containment based uncontrolled. Otherwise, polymer can upset the treatment process. An approach to containing polymer spills is needed. MWalkowiak 7/19/2021 11:46 Unchecked 2107 Re: Re: Re: Markup Callout P-102-85-1 The drains within the polymer containment area are valved to preclude flow to the drain pumps uncontrolled. Full containment is provided M Wilson 7/23/2021 5:02 Unchecked 2108 Markup Callout P-102-85-1 NEED SUMP IN CONTAINMENT BASIN MWalkowiak 7/19/2021 11:47 Unchecked 2109 Re: Markup Callout P-102-85-1 Sump provided at middle of east side of area. can33158 6/30/2021 13:35 Unchecked 2110 Callout P-102-85-1 Nora - Can a urinal be added to the truck driver restroom? Aric 8/17/2021 11:40 Checked 2111 Re: Callout P-102-85-1 Would require a larger room, and space is limited. Suggest retaining as a single toilet restroom M Wilson 7/23/2021 5:03 Unchecked 2112 Text Box P-102-85-1 Jose C = provide cover page showing all piping material, legend of abbreviations, code cycle being used, description of work, etc. Aric 7/12/2021 14:25 Unchecked 2113 Re: Text Box P-102-85-1 Will provide in next stage of design. Piping materials are will be covered in specs. can33158 7/23/2021 11:46 Unchecked 2114 Cloud+ P-102-85-1 Jose C - what are these for. If for drain equipment, then it must fallow plumbing code. Note: plumbing system must fallow CPC. Note: installation on slab must comply with CPC 312.2 Aric 7/12/2021 14:26 Unchecked 2115 Re: Cloud+ P-102-85-1 These are condensate drains for fans. They will be part of PFD system. Will verify CPC 312.2 requirements are met. can33158 7/23/2021 11:47 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 2117 QC Reviewer Cloud+Comment: Cloud+Comment added P-103-85-1 Add area plan Dan Stewart 6/24/2021 10:59 Unchecked 2118 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-103-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:54 Unchecked 2119 QC Reviewer Callout: Comment added P-103-85-1 Can the floor slope be screened? Dan Stewart 6/24/2021 11:00 Unchecked 2120 Re: QC Reviewer Callout: Comment added P-103-85-1 yes, this can be done M Wilson 8/2/2021 10:19 Unchecked 2121 QC Reviewer Callout: Comment added P-103-85-1 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 11:01 Unchecked 2122 Re: QC Reviewer Callout: Comment added P-103-85-1 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 4:57 Unchecked 2123 Text Box P-103-85-1 Jose C. Provide Isometric Drawings for waste system single line only Aric 7/19/2021 17:12 Unchecked 2124 Re: Text Box P-103-85-1 Will be provided in next stage of design. can33158 7/23/2021 11:49 Unchecked 2126 QC Reviewer Callout: Comment added P-104-85-1 Should this piping should show on level below, instead? Dan Stewart 6/24/2021 7:57 Unchecked 2127 Re: QC Reviewer Callout: Comment added P-104-85-1 Shown on roof plan for clarity, and is similar to floor drain piping shown as dashed below the floor it serves on other plans. can33158 7/9/2021 9:19 Unchecked 2128 QC Reviewer Callout: Comment added P-104-85-1 Call out the piping drops here. Dan Stewart 6/24/2021 10:58 Unchecked 2129 Re: QC Reviewer Callout: Comment added P-104-85-1 Invert elevations call out the drops. Notation for clarity will be added. can33158 6/30/2021 13:37 Unchecked 2130 QC Reviewer Cloud+Comment: Cloud+Comment added P-104-85-1 Add area plan Dan Stewart 6/24/2021 10:59 Unchecked 2131 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-104-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:55 Unchecked 2132 QC Reviewer Callout: Comment added P-104-85-1 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 11:02 Unchecked 2133 Re: QC Reviewer Callout: Comment added P-104-85-1 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 4:58 Unchecked 2134 Cloud+ P-104-85-1 Jose C - provide area for each roof dran, slope of pipe. Aric 7/12/2021 14:27 Unchecked 2135 Re: Cloud+ P-104-85-1 This information is provided in calculations that were submitted with the drawings. Invert elevations are provided for contractor. can33158 7/23/2021 12:06 Unchecked 2136 Cloud+ P-104-85-1 Jose C - all vents to terminate at roof. Aric 7/12/2021 14:28 Unchecked 2137 Re: Cloud+ P-104-85-1 Will comply. can33158 7/23/2021 12:09 Unchecked 2139 QC Reviewer Cloud+Comment: Cloud+Comment added P-106-85-2 Add area plan Dan Stewart 6/24/2021 10:59 Unchecked 2140 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-106-85-2 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:55 Unchecked 2141 QC Reviewer Callout: Comment added P-106-85-2 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 11:02 Unchecked 2142 Re: QC Reviewer Callout: Comment added P-106-85-2 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 4:58 Unchecked 2143 Callout P-106-85-2 Nora - Consider centering the hose racks on the eastern and western walls of the truck loadout building so that they can be used equally regardless of which bin a truck is parked under, or provide longer hoses. Aric 8/17/2021 11:40 Checked 2144 Re: Callout P-106-85-2 There are multiple hose racks, one on each side, and hose reels on either end and each can be provided with ample hose to reach all portions of the truck regardless of the position its parked in within the bay M Wilson 7/11/2021 15:36 Unchecked 2145 Callout P-106-85-2 Nora - Confirm that at least two exterior hose racks will be included/shown just outside the truck bays in the next set of drawings (i.e., in lieu of the automatic truck wheel wash system). Aric 8/17/2021 11:40 Checked 2146 Re: Callout P-106-85-2 Confirmed. Jonathan Keaney 7/10/2021 5:32 Unchecked 2147 Text Box P-106-85-2 Nora - Confirm the exterior automatic truck wheel wash system will be replaced with exterior manual, wand type hoses in the area with the extended curbs. Aric 8/17/2021 11:40 Checked 2148 Re: Text Box P-106-85-2 Confirmed. Jonathan Keaney 7/10/2021 5:31 Unchecked 2149 Cloud+ P-106-85-2 Jose C -all piping must be label as per 601.3 CPC Aric 7/12/2021 14:30 Unchecked 2150 Re: Cloud+ P-106-85-2 Please review Protective Coatings section, piping will be labeled according to that section. can33158 7/23/2021 12:11 Unchecked 2151 Cloud+ P-106-85-2 Jose C - What does WH stand for? Aric 7/12/2021 14:31 Unchecked 2152 Re: Cloud+ P-106-85-2 Wall Hydrant M Wilson 7/15/2021 16:28 Unchecked 2153 Cloud+ P-106-85-2 Jose C - needs shut off valve Aric 7/12/2021 14:31 Unchecked 2154 Re: Cloud+ P-106-85-2 Valve provided just inside building, see "SV AND PRESSURE GAUGE IN RISER" note. can33158 7/23/2021 12:12 Unchecked 2155 Callout P-106-85-2 Are there any isolation valves on these lines or do we have to shut the water down to the whole building to do repairs? Eric.Hovland 7/29/2021 13:56 Checked 2156 Re: Callout P-106-85-2 the line would be segmented so that portions could be isolated for maintenance M Wilson 7/27/2021 7:03 Unchecked 2157 Re: Re: Callout P-106-85-2 Could the segments and isolation vavles be added to the drawings? Eric.Hovland 7/29/2021 13:57 Unchecked 2159 QC Reviewer Cloud+Comment: Cloud+Comment added P-107-85-2 Add area plan Dan Stewart 6/24/2021 10:59 Unchecked 2160 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-107-85-2 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 4:55 Unchecked 2162 QC Reviewer Cloud+Comment: Cloud+Comment added P-403-85-1 Add area plan Dan Stewart 6/24/2021 10:59 Unchecked 2163 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-403-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 Unchecked 2164 QC Reviewer Callout: Comment added P-403-85-1 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 Unchecked 2165 Re: QC Reviewer Callout: Comment added P-403-85-1 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 Unchecked 2166 Cloud+ P-403-85-1 Jose C - provide details of installation process Aric 7/19/2021 Unchecked 2167 Re: Cloud+ P-403-85-1 Process Mechanical covers seal water panels and installation details. can33158 7/23/2021 Unchecked 2168 Cloud+ P-403-85-1 Jose C -pump can't be in elevator pit. Floor drain can be there, but not the pump. Provide details. Aric 7/19/2021 Unchecked 2169 Re: Cloud+ P-403-85-1 Will review Pit section of elevator code and comply with all requirements. can33158 7/23/2021 Unchecked 2170 Cloud+ P-403-85-1 Jose C - What is this for? if it is the neutralization tank? Why are you using it? Is is for a lab sink? Clarify on plans. Aric 7/19/2021 Unchecked 2171 Re: Cloud+ P-403-85-1 It is for the laboratory on the second level. Lab drainage all comes to this tank. can33158 7/23/2021 Unchecked 2172 Cloud+ P-403-85-1 Jose C - requires minimum working clearance as per 707.9 CPC Aric 7/19/2021 Unchecked 2173 Re: Cloud+ P-403-85-1 Will relocate to provide minimum working clearance. can33158 7/23/2021 Unchecked 2174 Cloud+ P-403-85-1 Jose C - floor drains to have trap primer. Trap primer material to be install with material as per indirect waste chapter 8 CPC. provide details. Aric 7/19/2021 Unchecked 2175 Re: Cloud+ P-403-85-1 Trap primers will be provided. See schedules for indication of trap primer connection, trap primers are specified in Plumbing Section. can33158 7/23/2021 Unchecked 2177 QC Reviewer Cloud+Comment: Cloud+Comment added P-404-85-1 Add area plan Dan Stewart 6/24/2021 Unchecked 2178 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-404-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 Unchecked 2179 QC Reviewer Callout: Comment added P-404-85-1 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 Unchecked 2180 Re: QC Reviewer Callout: Comment added P-404-85-1 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 Unchecked 2181 Text Box P-404-85-1 Jose C - Provide water calculations as per Appendix A CPC. Show Minimum static pressure, distance from pump, length of system, required GPM (as per code), GPM to fixture equivalent, provide hammer arresters for quick acting valves, Aric 7/19/2021 Unchecked 2182 Re: Text Box P-404-85-1 Calculations are provided separately as part of this submittal. can33158 7/23/2021 Unchecked 2184 QC Reviewer Cloud+Comment: Cloud+Comment added P-405-85-1 Add area plan Dan Stewart 6/24/2021 Unchecked 2185 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-405-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 Unchecked 2186 QC Reviewer Callout: Comment added P-405-85-1 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 Unchecked 2187 Re: QC Reviewer Callout: Comment added P-405-85-1 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 Unchecked 2189 QC Reviewer Cloud+Comment: Cloud+Comment added P-406-85-1 Where are the roof drain risers? Dan Stewart 6/24/2021 Unchecked 2190 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-406-85-1 Will verify and note what the pipe offset is for and show what is required. can33158 6/30/2021 Unchecked 2191 QC Reviewer Cloud+Comment: Cloud+Comment added P-406-85-1 Add area plan Dan Stewart 6/24/2021 Unchecked 2192 Re: QC Reviewer Cloud+Comment: Cloud+Comment added P-406-85-1 Not really relevant to the building. Drawing adequately shows the building which is the focus of the plan M Wilson 7/23/2021 Unchecked 2193 QC Reviewer Callout: Comment added P-406-85-1 Can centerlines be turned off? These clutter up the drawings. Dan Stewart 6/24/2021 Unchecked 2194 Re: QC Reviewer Callout: Comment added P-406-85-1 Centerlines are useful for the installing contractor and don't appear to clutter drawings excessively. Perfer to retain them. M Wilson 7/23/2021 Unchecked 2195 Text Box P-406-85-1 Jose C -Will the building have fire sprinkler system? If so, where is the drain for the testing will be discharge at? it must be discharge to an approved receptor (based on gpm) Aric 7/19/2021 Unchecked 2196 Re: Text Box P-406-85-1 Bldg will have Fire Suppression. An appropriate drain with discharge location will be provided. Will coordinate with Fire Protection Engineer. can33158 7/23/2021 Unchecked 2198 Cloud+ P-501-00 Where is the sensor on the system to know if this is being used? Also, is there a water isolation valve for this system for repairs? Eric.Hovland 7/15/2021 Unchecked 2199 Re: Cloud+ P-501-00 Refer to the plumbing plans for piping and isolation. There is a flow switch which will provide an alarm and strobe when the unit is used. Refer to specifications for the unit for details M Wilson 7/27/2021 Unchecked 2200 Re: Re: Cloud+ P-501-00 IS there a reference to the appropriate drawing set? Why is it not in this detailed drawing of the emergency wash stations? Eric.Hovland 7/29/2021 Unchecked 2201 Re: Re: Re: Cloud+ P-501-00 the flow switch is shown in the detail as this is the portion that would be piped up with the unit. The light and horn are shown on the P&ID, and electrical drawings M Wilson 8/3/2021 Unchecked 2203 Cloud+ P-501-00 Jose C - why only 1" hot? If inlet of equipment is 1-1/2", then provide 1-1/2" hot. Aric 7/19/2021 Unchecked 2204 Re: Cloud+ P-501-00 Typical hot water flow for tepid water blending applications only requires 1" line as the ratio of hot to cold is biased towards cold. can33158 7/23/2021 Unchecked 2205 Cloud+ P-501-00 Jose C -must terminate outside, to a floor sink or mop sink, not funnel receptor. Aric 7/19/2021 Unchecked 2206 Re: Cloud+ P-501-00 We are updating to an indoor floor sink per the plans. Detail will be corrected. can33158 7/23/2021 Unchecked 2208 Cloud+ P-601-00 Jose C - wrong specs. Pump 11GPM with 7.5' of head. Aric 7/19/2021 Unchecked 2209 Re: Cloud+ P-601-00 Will investigate an update as needed for next phase of design. can33158 7/23/2021 Unchecked 2210 Cloud+ P-601-00 Jose C - provide actual models- Aric 7/19/2021 Unchecked 2211 Re: Cloud+ P-601-00 This is a standard schedule adn the description is updated with performance requirements so that the contractor can select appropriate model. can33158 7/23/2021 Unchecked 2212 Text Box P-601-00 List all fixtures and plumbing equipment. Not all are listed. Aric 7/19/2021 Unchecked 2213 Re: Text Box P-601-00 Will update in next phase of design as others may be added at that time as well. can33158 7/23/2021 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document. 2214 Cloud+ P-601-00 Jose C -where's the discharge point? Aric 7/19/2021 Unchecked 2215 Re: Cloud+ P-601-00 Pump discharges to a funnel receptor next to east side of elevator shaft in process area. can33158 7/23/2021 Unchecked 2217 Highlight S-001-00 SEE THE QUALITY CONTROL SECTION AND THE CODE REQUIRED SPECIAL INSPECTIONS AND PROCEDURES SECTION OF THE SPECIFICATIONS FOR FURTHER CLARIFICATION OF RESPONSIBILITIES. dtikalsky 9/14/2021 Unchecked 2219 Markup Callout S-101-85-1 ADD SUMPS IN CONTAINMENT BASINS MWalkowiak 6/28/2021 Unchecked 2220 Re: Markup Callout S-101-85-1 There is a sump in the polymer area, it's just covered by the grating in the drawing. Will clarify in future submittals. M Wilson 8/3/2021 Unchecked 2222 Cloud+ S-102-85-1 RC: Are pre-cast removable slabs necessary or can removable handrail be utilized? rmaidrand 6/24/2021 Unchecked 2223 Re: Cloud+ S-102-85-1 Removable slabs allow for the area to be utilized for maintenance activities. Recommend retaining the removable slabs M Wilson 7/22/2021 Unchecked 2225 Callout S-901-85-2 Nora - What is the equipment between the rollup doors shown in rendering perspective 1? Aric 8/17/2021 Checked 2226 Re: Callout S-901-85-2 This is the loadout control room. The perspective is missing the wall details, which will be corrected. M Wilson 7/15/2021 Unchecked DRAFT--Contact the Office of the City Clerk at (408) 535-1260 or [email protected] for final document.